LAWRENCE F. KAINE vs DEPARTMENT OF ENVIRONMENTAL REGULATION, 93-000051 (1993)
Division of Administrative Hearings, Florida Filed:Miami, Florida Jan. 11, 1993 Number: 93-000051 Latest Update: Feb. 13, 1996

Findings Of Fact Based upon the evidence adduced at hearing, and the record as a whole, the following Findings of Fact are made: Petitioner owns Lot 5 on Saddlebunch Key in Monroe County, Florida. The lot is approximately 24 acres in size. It is located in a pristine area devoid of any exotic species. From west to east, Petitioner's property consists of: an approximately one acre low hammock, uplands area inhabited by buttonwood trees; a transition area slightly lower in elevation than the uplands area; a salt marsh area with key grass; a narrow mangrove area with mangroves between four and six feet tall; and an open water area. The first two hundred feet or so of the open water area has small coral sponges, sea grasses and algae on the bottom. Further out, the bottom is sandy with a minimal amount of vegetation. Among the species of birds that inhabit Petitioner's property and the surrounding area are the Little Blue Heron, White Ibis and Reddish Egret. The area is also the home of two endangered species, the Silver Rice Rat (which requires large expanses of undisturbed habitat such as that presently found in Saddlebunch Key) and the Lower Key Marsh Rabbit (which inhabits areas such as the transitional and marsh areas found on Petitioner's property). 1/ On April 20, 1992, Petitioner submitted to the Department an application for a permit to build a 1200 feet long/12 feet wide dock (hereinafter referred to as the "Proposed Dock") extending east from the uplands area of his property on Saddlebunch Key out into the open waters where the water depth is approximately four feet. The Proposed Dock will enable Petitioner (and his family, as well as visitors, both invited and uninvited) to more easily access the uplands area of his property, on which he plans to build a vacation home for his and his family's use. 2/ As a result of the closure and barricading of Sugarloaf Boulevard, there is no longer a route over dry land that Petitioner can take to get to the uplands. To reach the uplands, he must either walk through wetlands or navigate a boat through the shallow waters adjoining the uplands. Regardless of which means of access he chooses, the bottom (the mud and muck in which he steps when he travels by foot and the coral sponges, sea grasses and algae against which his boat scrapes when he travels by boat) is disturbed. 3/ The Proposed Dock will be located in a Class III, Outstanding Florida Water. On May 6, 1992, the Department, by letter, advised Petitioner that it had received his application and determined that it was incomplete. The letter specified the additional information and materials Petitioner needed to supply to make his application complete. On July 8, 1992, Petitioner provided the Department with additional information and materials in response to the request made by the Department in its May 6, 1992, letter. By letters dated July 20 and 21, 1992, the Department advised Petitioner that it had received his July 8, 1992, submission, but that, notwithstanding this submission, his application remained incomplete. The letters specified the additional information and materials Petitioner still needed to supply to make his application complete. On August 10, 1992, Petitioner provided the Department with additional information and materials in response to the request made by the Department in its July 20 and 21, 1992, letters. By letter dated August 18, 1992, the Department advised Petitioner that it had received his August 10, 1992, submission, but that, notwithstanding this submission, his application remained incomplete. The letter specified the additional information and materials Petitioner still needed to supply to make his application complete. On September 9, 1992, Petitioner provided the Department with additional information and materials in response to the request made by the Department in its August 18, 1992, letter. In his letter Petitioner requested that the Department "process [his] application." Less than 90 days later, on December 7, 1992, the Department issued a Notice of Permit Denial. Petitioner has not provided reasonable assurance that the Proposed Dock will not degrade the quality of the water in and around the project site, nor has he provided reasonable assurance that the Proposed Dock is clearly in the public interest. Turbidity will occur during the construction of the Proposed Dock. When the holes into which the dock pilings will be placed are bored, the excavated material will become suspended and, if not contained, will flow with the current. The containment required will be substantial. The use of turbidity curtains is an accepted means of limiting turbidity. Although Petitioner has indicated that he will use turbidity curtains during the construction of the Proposed Dock, he has not indicated where they will be placed, how long they will remain in place and how they will be used. Turbidity has an adverse impact on the transparency of water (that is, the degree to which sunlight is able to penetrate the water). In and around the project site there is submerged vegetation that requires sunlight. If turbidity is not properly contained during construction, there will be a decrease in the transparency of the water in and around the project site and a resultant adverse impact on the biological function of the submerged vegetation in that area. Moreover, the Proposed Dock, when completed, will block sunlight and prevent this sunlight from reaching the submerged vegetation beneath the dock. Such shading will occur even though Petitioner has agreed to have one inch separations between the boards that will comprise the Proposed Dock's walkway. These separations will allow only a limited amount of sunlight to come through the dock. The amount of shading produced by the Proposed Dock will be substantial because the Proposed Dock will have an east/west alignment and therefore the sun will always be directly above it. 4/ Because the Proposed Dock will deprive the submerged vegetation beneath it of needed sunlight, the dock will have an adverse effect on such vegetation, as well as on the organisms that feed on such vegetation, and it will therefore reduce the diversity of life in the area. The reduction of the area's diversity of life will, in turn, adversely affect the biological integrity of the area. The activity associated with the construction and presence of the Proposed Dock and the vacation home that Petitioner will build if he is permitted to construct the Proposed Dock 5/ will flush birds that now inhabit Petitioner's property and the surrounding area, including the Little Blue Herons, White Ibises and Reddish Egrets, from their present habitat. This activity will also adversely affect other wildlife in the area, including, most significantly, the Silver Rice Rat and the Lower Key Marsh Rabbit, both of which are endangered species that will suffer from the invasion of the exotic species that will accompany the development of the area. In addition, the construction of the Proposed Dock will result in a loss of habitat for the Lower Key Marsh Rabbit. 6/ The Proposed Dock is intended to be a permanent structure and therefore its post-construction impacts will be of a long-lasting nature. It is reasonable to expect that other property owners in the vicinity of the Proposed Dock will seek a permit to construct a dock like Petitioner's if Petitioner is permitted to construct the Proposed Dock. These other projects, if they too are permitted, will have environmental consequences similar to those produced by the Proposed Dock. Although the Proposed Dock will enable Petitioner and his family to reach the uplands area of Petitioner's property without creating a disturbance on the bottom of the adjoining shallow waters, on balance, the Proposed Dock will have an adverse environmental impact on the uplands and surrounding area. The Proposed Dock's environmental disadvantages outweigh its environmental benefits. Petitioner has expressed a general willingness to make those modifications to his proposed project that will make the project permittable, but he has yet to make the modifications that will minimize the project's adverse environmental consequences. Mitigation of these consequences is a possibility. In the past, the Department has accepted both on-site and off-site mitigative measures. 7/

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is hereby RECOMMENDED that the Department of Environmental Protection enter a final order denying Petitioner's application for a dredge and fill permit to construct the Proposed Dock. DONE AND ENTERED in Tallahassee, Leon County, Florida, this 29th day of December, 1995. STUART M. LERNER, Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 29th day of December, 1995.

Florida Laws (10) 120.57120.60267.061373.403373.413373.414373.421380.06403.031403.0876 Florida Administrative Code (3) 62-312.02062-312.03062-4.055
# 1
CALOOSA PROPERTY OWNERS` ASSOCIATION, INC. vs. DEPARTMENT OF ENVIRONMENTAL REGULATION, 82-003458RX (1982)
Division of Administrative Hearings, Florida Number: 82-003458RX Latest Update: May 19, 1983

Findings Of Fact The Intervenors filed an Application for Dredge and Fill Permit with the Department of Environmental Regulation. The Department entered a notice of its intent to issue a permit. Petitioner requested a formal administrative hearing. The Department forwarded the matter to the Division of Administrative Hearings, where it was given Case No. 82-3155. A Recommended Order which includes Findings of Fact and Conclusions of Law has been entered in Case No. 82-3155. The Findings of Fact and Conclusions of Law set out in the Recommended Order are hereby incorporated into this Final Order and constitute a part of this Final Order. The Petitioner is an association of home owners within a residential development known as "Caloosa." Intervenors are seeking to develop an industrial park on land adjacent to the Caloosa development. Surface and ground waters from the proposed industrial park would drain toward Caloosa. Prior to the Department's entry of the notice of intent to issue a permit to Intervenors, the Department's personnel evaluated the application in free-form proceedings. An environmental specialist who works with the Department as a permit processor proposed to deny the application on account of the fact that Intervenors proposed to fill approximately 70 acres of wetlands, 24 of which were within the Department's permitting authority under Rule 17-4.28, Florida Administrative Code. The administrator of the Department's Dredge and Fill Permitting Section came to the conclusion that denial of the application could not be justified. He felt that the wetlands to be filled served only marginally to preserve water quality in the area. The Intervenors had proposed to artificially create wetland areas in order to compensate for the loss of filled wetland areas. The program administrator suggested to the permit processor that they negotiate to get the Intervenors to create additional artificial wetlands in order to mitigate against any possible adverse effect from the loss of natural wetland areas. These negotiations occurred, and the Intervenors agreed to increase artificially created wetland areas. The Department of Environmental Regulation does not have a rule which provides that its personnel can engage in negotiations respecting a permit application. Negotiations are, however, an inherent part of a permitting process. The Department does not have any written or unwritten policy whereby it accepts such mitigating factors as artificially created wetlands as justifying the filling of natural wetlands. It does not appear that the Department has any rule or nonrule policy concerning mitigation or trade-offs, and it does not appear that the Department has ever had such a rule or policy. The Department does not have a policy of accepting concessions, trade-offs, or mitigating factors so as to allow an applicant to violate the Department's water quality standards. Since there has been a permitting process, such factors as artificially created wetlands have been considered by the Department in determining whether an application meets the Department's criteria for issuance of a permit. The Department's policy is to consider whether an applicant has provided reasonable assurance that the short-term and long-term effects of proposed activities will not result in violations of water quality standards, as required under Rule 17- 4.28(3), Florida Administrative Code. If an applicant has proposed to construct artificial wetlands, the Department would logically consider it in making determinations about granting the permit. There is no evidence in the record of this proceeding from which it could be concluded that the Department has any unpromulgated "mitigation" policy which has the effect of a rule.

Florida Laws (2) 120.52120.56
# 2
NANCY CONDRON vs ST. JOHNS RIVER WATER MANAGEMENT DISTRICT AND 1044PVB, LLC, 16-000806 (2016)
Division of Administrative Hearings, Florida Filed:Jacksonville, Florida Feb. 12, 2016 Number: 16-000806 Latest Update: Aug. 01, 2016

The Issue The issue to be determined in this case is whether 1044PVB, LLC (“Applicant”), is entitled to Environmental Resource Permit (“ERP”) No. IND-109-143282-1 from the St. Johns River Water Management District (“District”), authorizing the construction of a surface water management system to serve a proposed residential development in St. Johns County, Florida.

Findings Of Fact The Parties Petitioner Nancy Condron is a resident and landowner in St. Johns County. Her residence is located across Ponte Vedra Boulevard from the Project. Petitioner uses the nearby Guana River Wildlife Management Area for nature-based recreation, including hiking and bird-watching. Applicant is a foreign limited liability company and the applicant for the ERP at issue in this case. The District is an independent special district granted powers and assigned duties under chapter 373, Florida Statutes, including powers and duties related to the regulation of construction activities in wetlands. The Project is within the boundaries of the District. The Project Site The Project site is 17.13 acres located at 1044 Ponte Vedra Boulevard in St. Johns County, Florida. The site currently consists of forested lands on the east and west and pasture areas in the middle. There is an existing trail road that runs the length of the property and a small residence. The site has four small ponds excavated as watering holes, ranging in size from 0.04 to 0.24 acres. There are 4.41 acres of wetlands and other surface waters on the site. There is a 3.49-acre area of mixed forested wetland on the site that continues offsite to the south and west. There are also three isolated wetlands on the site, each less than a half-acre in size. The wetland system adjacent to the Project site flows to the Guana River. The Guana River is a freshwater, Class III waterbody. It is an Outstanding Florida Water, but has been designated by the Department of Environmental Protection as impaired for nutrients. The site is not used by threatened or endangered species for feeding, nesting, or breeding. The Project The proposed Project is a 22-lot, single-family subdivision. The proposed surface water management system for the Project includes curb and gutter paved roadways, storm inlets, concrete pipes, vegetated natural buffers, treatment swales, and a wet detention stormwater pond. The wet detention stormwater pond would discharge into adjacent wetlands that flow to the Guana River. Wetlands The point of discharge from the Project’s stormwater management system is not in the designated Outstanding Florida Water. Applicant proposes to fill the four ponds and the three isolated wetlands. Applicant also proposes to fill 0.28 acres of the larger wetland. The Project includes a number of upland buffers that are a minimum of 15 feet in width and average of 25 feet in width. These buffers are intended to prevent potential adverse secondary impacts to adjacent wetlands. All wetland impacts and mitigation were assessed using the Uniform Mitigation Assessment Method (UMAM) in Florida Administrative Code Rule 62-345. The UMAM assessment takes into consideration the location and landscape support, water environment, and community structure of the wetlands to be impacted. The District also considers the condition, hydrologic connection, uniqueness, location, and the fish and wildlife utilization of the wetlands and other surface waters. The District did not require mitigation for filling the artificial ponds. The District also did not require mitigation for filling the isolated wetlands because each is less than a half-acre in size. As mitigation for filling 0.28 acres of the larger wetland, Applicant would purchase 0.25 mitigation bank credits from the St. Marks Pond Mitigation Bank. The St. Marks Pond Mitigation Bank is located in the same drainage basin as the wetland area that would be filled. The District determined that purchasing the mitigation bank credits would offset the functional loss associated with filling part of the wetland. Two areas on the site where no upland buffers are proposed were assessed for secondary impacts to wetlands in the UMAM evaluation. The mitigation bank credits proposed for the Project would offset all of the adverse, direct, and secondary impacts to wetlands or surface waters associated with this Project. Because direct and secondary impacts would be fully mitigated, the Project would not cause cumulative impacts. Water Quantity A majority of the Project’s stormwater runoff would be conveyed to the wet detention pond. The wet detention pond provides water quantity protection by attenuating the post- development peak rate of discharge. Applicant modeled the pre-development peak rate of discharge and the post-development peak rate of discharge. The modeling indicated that the post-development peak rate of discharge will not exceed the pre-development peak rate of discharge for the 25-year, 24-hour storm event. Section 3.3 of the Applicant's Handbook, Volume II, prohibits a reduction in the 10-year or 100-year floodplain for projects with an upstream drainage basin of five square miles or greater. The proposed Project has an upstream drainage basin of 4.6 square miles, so this criterion is not applicable. Applicant showed the Project would increase offsite flood elevations by only 0.01 feet, which is negligible. The Project would not cause adverse water quantity impacts to receiving waters or adjacent lands. Water Quality Water quality would be managed in the Project through a combination of wet detention pond, swales, and vegetative natural buffers (“VNBs”). The wet detention pond would treat a majority of the runoff from the Project. Section 8 of the Applicant’s Handbook, Volume II, contains presumptive criteria for the design of a wet detention pond. The proposed wet detention pond meets the presumptive criteria. Therefore, the detention pond is presumed to provide reasonable assurance that the water quality of receiving waters will be protected. Applicant is proposing to construct swales at the back of Lots 20, 21, and 22 to treat runoff by infiltration. Section 9 of the Applicant’s Handbook, Volume II, contains presumptive criteria for swale system design and performance. The Project meets the presumptive criteria for swales. Applicant is proposing VNBs on Lots 1 through 14. The use of VNBs is a commonly-used best management practice accepted by the District for treating stormwater runoff. Like swales, VNBs treat runoff by infiltration. Stormwater runoff from the backyards of Lots 1 through 14 would drain to the VNBs. On some of these lots, stormwater runoff from the front yards, side yards, and rooftops would also drain to the VNBs. The lots would be graded so that runoff would sheet flow to the VNBs to maximize their treatment function. The VNBs would have native soils and plants. The VNBs would have Type A soils, which are well-drained soils that provide the highest rate of infiltration and the most permeability. Petitioner contends that, because soil borings were not taken at the location of the VNBs, reasonable assurance was not provided that the VNBs would function as proposed. However, Petitioner did not show that the soils at the VNB locations were unsuitable soils. In addition, Applicant agreed to use Type A soils in the VNBs. Therefore, reasonable assurance that the VNBs would have suitable soils was provided by Applicant. Petitioner referred to a draft rule to support her contention that the proposed VNBs are not properly designed, but the draft rule has no controlling effect and is hearsay. The Applicant’s Handbook does not contain presumptive criteria for VNBs. Applicant demonstrated that the VNBs would infiltrate 80 percent of the runoff from a three-year, one-hour storm event, which is the same treatment efficiency the District requires when swales are used. Reasonable assurance was provided that the VNBs would function as proposed. Because the Project would discharge to wetlands that flow to the Guana River, a waterbody impaired by nutrients, section 2.2 of the Applicant’s Handbook, Volume II, requires Applicant to demonstrate there would be a net improvement in water quality with respect to nutrients. Applicant performed a pollutant loading analysis using the BMPTRAINS model. The BMPTRAINS model is a generally-accepted tool used by stormwater engineers for this purpose. The BMPTRAINS model incorporates the information about the pre- and post-development conditions associated with land use and impervious area. The model accounts for site-specific conditions, including the elevation of the groundwater table and storage capacity of the soil. The design of the surface water management system is then incorporated into the model to estimate the pollutant removal efficiency and estimate the average annual pollutant load that will leave the site. Applicant’s BMPTRAINS modeling indicated that the average annual post-development loading for total nitrogen and total phosphorus would be substantially less than the pre- development loading for those nutrients. Therefore, Applicant demonstrated the Project would result in a net improvement. Operation & Maintenance The Ponte Vedra Beach Preserve Homeowners Association would be the entity responsible for operation and maintenance of the stormwater management system. The wet detention pond, swales, and VNBs would be located within an easement and maintained by the homeowner’s association. Applicant and the Ponte Vedra Beach Preserve Homeowners Association have the ability to accept responsibility for the operation and maintenance of the Project. Public Interest An applicant for an ERP must demonstrate that a proposed project affecting wetlands and other surface waters would not be contrary to the public interest. This determination is made by balancing seven factors found in section 10.2.3(a) through (g) of the Applicant’s Handbook, Volume I. Public interest factor (a) is whether the regulated activity will adversely affect public health, safety, or welfare, or the property of others. There is no aspect of the Project that would affect public health, safety, or welfare, except the potential for flooding. Reasonable assurance was provided by Applicant that the Project would not cause flooding. Factor (b) is whether the regulated activity will adversely affect the conservation of fish and wildlife, including endangered or threatened species or their habitats. The mitigation bank credits offset all of the potential adverse impacts that the proposed project would have on the conservation of fish and wildlife. Factor (c) is whether the regulated activity will adversely affect navigation or the flow of water or cause harmful erosion or shoaling. The parties stipulated that the Project will not adversely affect navigation or cause harmful erosion or shoaling. The record evidence shows the Project will not adversely affect the flow of water. Factor (d) is whether the regulated activity will adversely affect the fishing or recreational values or marine productivity in the vicinity of the activity. The Project would not affect fishing or recreational values in the vicinity. The mitigation bank credits offset all of the potential adverse impacts the proposed project would have on marine productivity in the vicinity. Factor (e) is whether the regulated activity will be of a temporary or permanent nature. The activities are of a permanent nature. The mitigation is also permanent. Factor (f) is whether the regulated activity will adversely affect or will enhance significant historical and archaeological resources. The Project will have no effect on historical and archaeological resources. Factor (g) is the current condition and relative value of functions being performed by areas affected by the proposed regulated activity. The relatively small loss of functional value would be offset by the proposed mitigation. Considering and balancing these seven factors, the Project would not be contrary to the public interest.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the St. Johns River Water Management District enter a final order approving the issuance of Environmental Resource Permit No. IND-109-143282-1 to 1044PVB, LLC, with the conditions set forth in the Technical Staff Report dated April 11, 2016. DONE AND ENTERED this 16th day of June, 2016, in Tallahassee, Leon County, Florida. S BRAM D. E. CANTER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 16th day of June, 2016. COPIES FURNISHED: Karen C. Ferguson, Esquire St. Johns River Water Management District 4049 Reid Street Palatka, Florida 32177 (eServed) Jane West, Esquire Josh Smith, Esquire Jane West Law, P.L. 6277 A1A South, Suite 101 St. Augustine, Florida 32080 (eServed) Eric Olsen, Esquire Amelia A. Savage, Esquire Hopping, Green and Sams, P.A. Post Office Box 6526 Tallahassee, Florida 32314 (eServed) Ann B. Shortelle, Ph.D., Executive Director St. Johns River Water Management District 4049 Reid Street Palatka, Florida 32177 (eServed)

Florida Laws (3) 120.52120.56917.13
# 3
SHIRLEY B. HAYNES AND EGERTON K. VAN DEN BERG vs KGB LAKE HOWELL, LLC AND ST. JOHNS RIVER WATER MANAGEMENT DISTRICT, 01-004545 (2001)
Division of Administrative Hearings, Florida Filed:Orlando, Florida Nov. 26, 2001 Number: 01-004545 Latest Update: Mar. 31, 2003

The Issue The issue is whether an Environmental Resource Permit should be issued to KGB Lake Howell, LLC, authorizing the construction of a surface water management system to serve an apartment complex known as the Estates at Lake Howell in the City of Casselberry, Florida.

Findings Of Fact Based upon all of the evidence, the following findings of fact are determined: Background In this proceeding, Respondent, St. Johns River Water Management District (District), proposes to issue an Environmental Resource Permit to Respondent, KGB Lake Howell, LLC (Applicant), authorizing the construction of a stormwater management system to serve a 240-unit apartment complex known as the Estates of Lake Howell. The project will be located on an undeveloped tract of land in the City of Casselberry (City), Seminole County, Florida, just north of the Orange County line. It will include ten three-story buildings, parking, clubhouse/ administration building, amenity complex, and wet detention pond. The project also incorporates a 3.62-acre stormwater pond, now owned and used by Seminole County (County), lying east of Lake Ann Lane across from the project site, which was included in the overall acreage calculations for the purpose of increasing apartment density on the site. The Applicant has authorization from the County to apply for the permit incorporating that tract of land. The pond will continue to function as a stormwater facility for the County and will not accommodate stormwater from the project site. The project site consists of 38.9 acres located on the north side of Howell Branch Road, east of State Road 436 (also known as Semoran Boulevard), and west of Lake Ann Lane in the City. The site is currently undeveloped and includes an abandoned orange grove and upland pine flatwoods community, which make up approximately 14.6 acres, while the remaining 24.3 acres is a mixed forested wetland system. The property is now owned by the Harold Kasik Living Trust (Kasik property), which has a contract for purchase with the Applicant. The Kasik property is in the shape of a rectangle, 648 feet by 2,530 feet, with its long sides running north- south. It is bordered on the north and east by single-family residential and vacant land, to the south by commercial development, and to the west by high-density residential and commercial development. The property has a high elevation of approximately 83 feet on its southeastern corner and falls to the north/northeast, where the edge of the wetland system is at an elevation of 63 or 64 feet. The major development constraint on the site is the large wetland tract on the northern portion of the property. In order to minimize proposed impacts to the wetlands, the Applicant proposed the transfer of the development entitlements from the County land to benefit the Applicant's property. More specifically, the Applicant will acquire the County property, the Applicant will simultaneously grant a perpetual drainage easement over the property to the County, the Applicant will maintain the landscaping of the property in perpetuity, the Applicant will convey around five acres of wetlands on the northern end of the Kasik property to the County in fee simple, and the City will allow the transfer of development rights from the property. The project will adversely impact 0.99 acres of low- quality wetlands, of which 0.72 acres are to be dredged and 0.27 acres are to be filled to provide the fencing around the wet detention facility. To offset this impact, the Applicant proposes to preserve 17.8 acres of forested wetlands, plus 1.2 acres of forested uplands, or a mitigation ratio of 18:1. The District's guidelines for preservation mitigation applicable to this project are 10:1 to 60:1 for wetland impacts and 3:1 to 20:1 for upland impacts; thus, the mitigation plan falls within these guidelines. Under current conditions, stormwater runoff from the project site sheet flows into the on-site wetland and ultimately Lake Howell (the Lake), a Class III water body which meets all applicable water quality standards and is not an Outstanding Florida Water. After development occurs, stormwater from the developed portions of the property will be conveyed to a wet detention pond for required water quality treatment and peak discharge rate attenuation. After treatment in the detention pond, the water will discharge to the on-site wetland, as it does now, and eventually will be conveyed into the Lake. Off-site flows will continue to be conveyed into the on-site wetland. The wet detention pond, which has a minimum depth of twelve feet and a permanent pool of water with a mean depth of two to eight feet, has been designed to accommodate a 25-year, 24-hour storm. Post-development discharge will be less than pre-development, and the outfall structure has been designed to avoid channelization in the wetlands after the point of discharge. Since at least the late 1940's, Petitioner, Shirley Haynes, or her relatives, have owned, or resided on, a multi-acre tract of land just north of the project site at 2764 Lake Howell Lane. She has substantial frontage on the south side of the Lake. The southern portion of her property, which are wetlands, adjoins the northern boundary of the project site. For the past three years, Petitioner, Egerton van den Berg, has resided on a ten-acre tract of land at 1245 Howell Point, which is northeast of the project site. He has approximately 235 feet of frontage on the south side of the Lake. As argued in their Proposed Recommended Order, Petitioners generally contend that the application is "materially deficient" in several respects in violation of Rule 40C-4.101; that the Applicant has failed to satisfy Rule 40C-4.301(1)(c) and (d), which in turn constitutes a failure to meet the requirements of Rule 40C-4.302(1)(a)-(c); that the Applicant failed to satisfy the criteria in Sections 12.2.3(a)-(f), 12.2.1, 12.2.1.1, 12.2.1.3, 12.2.2.3(a)-(e), 12.2.2.4(a) and (b), 12.3.2.2(c), and 12.3.8(a) of the Applicant's Handbook: Management and Storage of Surface Waters (Applicant's Handbook); that the District did not adequately consider the cumulative impacts of the project as required by Section 373.414(8)(a), Florida Statutes; that a low flow analysis of the Lake was not performed, as required by Rule 40C-8.011(5); that the Applicant did not submit detailed mitigation plans as required by Section 12.3.3.2 of the Applicant's Handbook; that the 18:1 ratio for mitigation proposed by the Applicant is inappropriate; and that the District should not approve the density of the apartments established by the City. These concerns, to the extent they have been identified as issues in the parties' Pre-Hearing Stipulation, are addressed in the findings below. Where contentions have been raised by Petitioners, such as the placement of the detention pond over a depressional area, and they have not been argued in the Proposed Recommended Order, they have been deemed to be abandoned. Conditions for issuance of permits Rule 40C-4.301(1)(a)-(k), Florida Administrative Code, specifies eleven substantive requirements for which reasonable assurance must be given in order for a standard permit to be issued. Subsection (3) of the same Rule provides that the standards and criteria contained in the Applicant's Handbook shall determine whether the foregoing reasonable assurances have been given. Additional conditions for the issuance of a permit are found in Rule 40C-4.302(1) when the project, or any part of it, is located in, on, or over wetlands or other surface waters. Therefore, because a part of the Applicant's system will be located in wetlands, the Applicant must also give reasonable assurance that the project will not be contrary to the public interest, and that it will not cause unacceptable cumulative impacts upon the wetlands or surface waters. a. Rule 40C-4.301 Paragraphs (a)-(c) of the Rule require that an applicant provide reasonable assurance that the project will not cause adverse water quantity impacts to receiving waters and adjacent lands, adverse flooding to on-site or off-site property, or adverse impacts to existing surface water storage and conveyance capabilities. If a system meets the requirements of Section 10.2.1(a) through (d) of the Applicant's Handbook, there is a presumption that the system complies with the requirements of Paragraphs (a) through (c). This presumption has been met since the evidence supports a finding that the post- development peak rate of discharge will be lower than the pre- development peak rate of discharge for a 24-hour, 25-year storm event. Therefore, the Applicant's system meets the requirements of these Paragraphs. Paragraph (d) of the Rule requires that an applicant give reasonable assurance that the project "will not adversely impact the value of functions provided to fish and wildlife and listed species by wetlands and other surface waters." To satisfy this requirement, an applicant must also demonstrate compliance with the two-prong test in Sections 12.2.2 and 12.2.2.4 of the Applicant's Handbook. Section 12.2.2 requires that an applicant provide reasonable assurance that a regulated activity will not impact the values of wetlands and other surface water functions so as to cause adverse impacts to the abundance, diversity, and habitat of fish, wildlife, and listed species. In its proposal, the Applicant proposes to fill a total of 0.99 acres of wetlands. Since these impacts will eliminate the ability of the filled part of the on-site wetland to provide functions to fish and wildlife, the filling will cause adverse impacts. Under these circumstances, Section 12.2.1.1 requires that the Applicant either implement practicable design modifications to reduce or eliminate these adverse impacts or meet one of the exceptions under Section 12.2.1.2. Under Section 12.2.1.1, a proposed modification which is not technically capable of being done, is not economically viable, or which adversely affects public safety through the endangerment of lives or property is not considered practicable. The Applicant’s design for the proposed project went through a number of iterations prior to submittal to the District to reduce adverse impacts to the wetlands. During the permitting process, the District requested that the Applicant consider a number of other suggestions to reduce or eliminate the adverse impacts to wetlands such as adding a fourth floor to the apartment buildings to eliminate the need for one apartment building, building a parking garage for the tenants, and eliminating the tennis and volleyball courts. Because the Applicant provided detailed reasons why none of those suggestions were practicable, it was not required to implement any of those design modifications. In addition, the Applicant’s decision not to include a littoral zone around the stormwater pond did not increase the amount of wetland impacts as that engineering decision resulted in a stormwater pond that was simply deeper and not wider. Therefore, the Applicant has met the requirement to reduce or eliminate adverse wetland impacts. Section 12.2.1.1 only requires an elimination and reduction analysis when: (1) a proposed system will result in adverse impacts to wetland functions and other surface water functions so that it does not meet the requirements of Sections 12.2.2 through 12.2.3.7, or (2) neither one of the two exceptions within Section 12.2.1.2 applies. In determining whether one of the two exceptions in Section 12.2.1.2 applies, the District must evaluate the long- term ecological value of the mitigation proposed by the Applicant. If the mitigation is not adequate to offset the adverse impacts of the proposed system, then it is unlikely either exception in Section 12.2.1.2 will apply. As noted above, the Applicant’s proposed dredging and filling of the southern edge of the wetlands on the project site will eliminate the ability of that wetland area to provide functions to fish and wildlife. However, the Applicant’s mitigation plan of placing 17.8 acres of wetlands and 1.2 acres of uplands under a conservation easement to preserve that property in its natural state in perpetuity will fully replace the types of functions that the part of the wetlands proposed to be impacted provides to fish and wildlife. The mitigation plan will also offset the adverse impacts that this project will have on the value and functions provided to fish and wildlife by the impacted part of the wetlands. In this case, the first exception under Section 12.2.1.2(a) applies as it meets that Section's two requirements: the ecological value of the functions provided by the area of wetland to be adversely affected is low, and the proposed mitigation will provide greater long-term ecological value than the area or wetland to be adversely affected. Also, the quality of the wetland to be impacted is low. All of the proposed impacts will occur in the area of the wetland that was historically disturbed and in which nuisance and exotic species are prevalent. Due to nuisance and exotic vegetation, the ecological value provided by that area to wildlife is low. The mitigation for the proposed project will provide greater long-term ecological value to fish and wildlife than the part of the wetland proposed to be impacted because the proposed mitigation will preserve eighteen times more wetlands that are of higher quality and provide greater value than the wetland area to be impacted. The type of wetland to be preserved, a mixed forested wetland containing hardwoods, is rare for the area. Although the mitigation plan will provide greater long-term ecological value to fish and wildlife than the part of the wetland proposed to be impacted, the Applicant did not meet the second exception in the elimination and reduction rule under Section 12.2.1.2(b) because the wetlands to be preserved are not regionally significant. In addition to meeting the elimination and reduction rule through implementation of practicable design modifications, the Applicant also satisfied the same rule by meeting the first exception found in Section 12.2.1.2(a). Thus, the Applicant has satisfied Section 12.2.2, which is the first prong of the test to determine compliance with Paragraph (d). The second prong of the test to determine whether Paragraph (d) of the Rule has been satisfied is found in Section 12.2.2.4. That Section requires that an applicant give reasonable assurance that the activity will not change the hydroperiod of a wetland so as to affect wetland functions. For the following reasons, that prong of the test has been satisfied. Since the wetlands are primarily groundwater-influenced, the construction of the stormwater pond between the project and the wetlands will not adversely affect the wetlands. As the soils surrounding the pond are very porous with a high infiltration and percolation rate, water from the stormwater pond will still reach the wetlands through lateral seepage. Further, the Applicant will install an energy dissipating device on the outfall spout at the point of discharge so that water will be spread out from the stormwater pond as it discharges into the receiving wetlands. As noted earlier, this will prevent an adverse channelization effect. Finally, stormwater runoff from the surrounding basins that currently discharge into the wetlands will not be affected by the construction of the stormwater system. That runoff will continue to flow into the wetlands on the project site. Because the Applicant has satisfied Sections 12.2.2 and 12.2.2.4, Paragraph (d) of the Rule has been met. Paragraph (e) of the Rule generally requires that an applicant provide reasonable assurance that a project will not adversely affect the quality of receiving waters. Here, the Applicant has provided such assurance. This is because the system has been designed in accordance with all relevant District criteria. Also, the Applicant has proposed to revise Permit Condition 26 as follows: Condition 26. This permit authorizes construction and operation of a surface water management system as shown on the plans received by the District on June 14, 2001, and as amended by plan sheet C4 (Sheet 07 of 207) received by the District on January 23, 2002. In view of this revision, the Applicant's wet detention system complies with all of the design criteria contained in Rule 40C-42.026(4). Under Rule 40C-42.023(2)(a), compliance with the design criteria contained in Rule 40C-42.026 creates a presumption that state water quality standards, including those for Outstanding Florida Waters, will be met. This presumption has not been rebutted; therefore, the requirements of Paragraph (e) of the Rule have been satisfied. Further, Sections 12.2.4.1 and 12.2.4.2 state, in part, that reasonable assurance regarding water quality must be provided both for the short term and the long term, addressing the proposed construction, alteration, operation, maintenance, removal, and abandonment of the system. The Applicant has provided reasonable assurance that this requirement is met through the design of its surface water management system, its long-term maintenance plan for the system, and the long and short-term erosion and turbidity control measures it proposes. If issued, the permit will require that the surface water management system be constructed and operated in accordance with the plans approved by the District. The permit will also require that the proposed erosion and turbidity control measures be implemented. Section 12.2.4.5 does not apply because there are no exceedances of any water quality standards at the proposed receiving water. Also, Sections 12.2.4.3 and 12.2.4.4 do not apply because the Applicant has not proposed any docking facilities or temporary mixing zones. Paragraph (f) of the Rule requires that an applicant not cause adverse secondary impacts to the water resources. Compliance with this requirement is determined by applying the four-part test in Section 12.2.7(a) through (d). As to Section 12.2.7(a), there are no secondary impacts from construction, alteration, and intended or reasonably expected uses of the proposed system that will cause water quality violations or adverse impacts to the wetland functions. The Applicant chose not to provide buffers abutting the wetlands but rather chose measures other than buffers to meet this requirement. The Applicant has provided reasonable assurance that secondary impacts will not occur by placing the stormwater pond between the planned project and the wetlands, so that the pond itself will serve as a buffer by shielding the wetland from the lighting and noise of the project, and by acting as a barrier to keep domestic animals out of the wetlands. In addition, the Applicant increased the amount of property to be preserved as mitigation by adding 2.97 acres of wetlands and 1.2 acres of uplands to the mitigation plan to mitigate for any remaining secondary impacts. Accordingly, the first part of the secondary impacts test in Section 12.2.7(a) is satisfied. As to Section 12.2.7(b), because there is no evidence that any aquatic or wetland-dependent listed animal species use uplands for existing nesting or denning adjacent to the project, the second part of the test has been met. No adverse secondary impacts will occur under the third part of the test in Section 12.2.7(c) because the proposed project will not cause impacts to significant historical or archaeological resources. Finally, adverse secondary impacts as proscribed by Section 12.2.7(d) will not occur because no evidence was presented that there would be additional phases or expansion of the proposed system or that there are any onsite or offsite activities that are closely or causally linked to the proposed system. Therefore, the proposed project satisfies Paragraph (f) of the Rule. Paragraph (g) of the Rule requires that an applicant provide reasonable assurance that a project will not adversely impact the maintenance of surface or ground water levels or surface water flows established in Chapter 40C-8. Minimum (but not maximum) surface water levels have been established for the Lake pursuant to Chapter 40C-8 for the basin in which the project is located. The project will not cause a decrease of water to, or cause a new withdrawal of water from, the Lake. Therefore, the project satisfies this requirement. Finally, Petitioners have acknowledged in their Proposed Recommended Order that the Applicant has given reasonable assurance that the requirements of Paragraphs (h), (i), (j), and (k) have been met. The parties have also stipulated that the receiving water (Lake Howell) meets all Class III water quality standards. Therefore, the project satisfies the requirements of Subsection 40C-4.301(2). Rule 40C-4.302 - Public Interest Test Under Rule 40C-4.302(1)(a)1.-7., an applicant must provide reasonable assurance that the parts of its surface water management system located in, on, or over wetlands are not contrary to the public interest. Similar requirements are found in Section 12.2.3. The Applicant has provided reasonable assurance that the parts of the project that are located in, on, or over wetlands (mainly the detention pond and fill) are not contrary to the public interest, because the evidence showed that all seven of the public interest factors to be balanced are neutral. Because the proposed permanent mitigation will offset the project’s adverse impacts to wetlands, no adverse effects to the conservation of fish and wildlife due to the project’s permanent nature will occur. The evidence also showed that best management practices and erosion control measures will ensure that the project will not result in harmful erosion or shoaling. Further, it was demonstrated that the project will not adversely affect the flow of water, navigation, significant historical or archaeological resources, recreational or fishing values, marine productivity, or the public health, safety, welfare or property of others. Finally, the evidence showed that the project’s design, including permanent mitigation, will maintain the current condition and relative value of functions performed by parts of the wetland proposed to be impacted. Therefore, the project meets the public interest criteria found in Rule 40C-4.302(1)(a). Rule 40C-4.302(1)(b) - Cumulative Impacts Rule 40C-4.302(1)(b) and Section 12.2.8 require that an applicant demonstrate that its project will not cause unacceptable cumulative impacts upon wetlands and other surface waters within the same drainage basin as the regulated activity for which the permit is being sought. Under this requirement, if an applicant proposes to mitigate the adverse impacts to wetlands within the same drainage basin as the impacts, and if the mitigation fully offsets these impacts, the District will consider the regulated activity to have no unacceptable cumulative impacts upon wetlands and other surface waters. The Applicant has chosen to mitigate for the impacts to 0.99 acres of wetlands by preserving 17.8 acres of wetlands and 1.2 acres of uplands on-site. Since this mitigation will occur in the same drainage basin as the impacts and the mitigation fully offsets those impacts, the Applicant satisfies the requirements of the Rule. Rule 40C-4.302 - Other Requirements The parties have stipulated that the requirements of Paragraphs (c) and (d) of Rule 40C-4.302(1) do not apply. There is no evidence that the Applicant has violated any District rules or that it has been the subject of prior disciplinary action. Therefore, the requirements of Subsection (2) of the Rule have been met. Miscellaneous Matters County Pond Site The Seminole County pond site located on the east side of Lake Ann Lane and across the street from the project is not a jurisdictional wetland and does not have any wetland indicators. It is classified as an upland cut surface water. The Applicant is not proposing to impact any wetlands at the pond site, and the site is not part of the proposed mitigation plan for the project. The permit in issue here is not dependent on the pond site, and nothing in the application ties the project with that site. Indeed, the transfer of density rights from the County property is not relevant to the District permitting criteria. Review of Application When the decision to issue the permit was made, the District had received all necessary information from the Applicant to make a determination that the project met the District's permitting criteria. While certain information may have been omitted from the original application, these items were either immaterial or were not essential to the permitting decision. The application complies with all District permitting criteria. Contrary to Petitioners' contention, the Applicant does not have to be the contract purchaser for property in order to submit an application for that property. Rather, the District may review a permit application upon receipt of information that the applicant has received authorization from the current owners of the property to apply for a permit. In this case, the Applicant has the permission of the current owners (the Harold Kasik Living Trust).

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the St. Johns River Water Management District enter a final order granting the requested permit as described above. DONE AND ENTERED this 29th day of March, 2002, in Tallahassee, Leon County, Florida. ___________________________________ DONALD R. ALEXANDER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 29th day of March, 2002. COPIES FURNISHED: Kirby B. Green, III, Executive Director St. Johns River Water Management District Post Office Box 1429 Palatka, Florida 32178-1429 Shirley B. Haynes 2764 Lake Howell Road Winter Park, Florida 32792-5725 Egerton K. van den Berg 1245 Howell Point Winter Park, Florida 32792-5706 Charles A. Lobdell, III, Esquire St. Johns River Water Management District Post Office Box 1429 Palatka, Florida 32178-1429 Meredith A. Harper, Esquire Shutts & Bowen Post Office Box 4956 Orlando, Florida 32802-4956

Florida Laws (3) 120.569120.57373.414
# 4
PETER A. LANE vs DEPARTMENT OF ENVIRONMENTAL PROTECTION AND INTERNATIONAL PAPER COMPANY, 05-001613 (2005)
Division of Administrative Hearings, Florida Filed:Pensacola, Florida May 04, 2005 Number: 05-001613 Latest Update: Aug. 09, 2007

Conclusions On May 11, 2007, the Division of Administrative Hearings (‘DOAH’) submitted a _ Recommended Order (“RO”) to the Department of Environmental Protection (‘DEP’) i in . these consolidated proceedings. Copies of the RO were served upon the Petitioners, Mellita A. Lane, Jacqueline M. Lane, Peter A. Lane, (“Lane Petitioners”); Friends of Perdido Bay,.Inc., and James A. Lane (“FOPB”); and the Co-Respondent, International Paper Company (“IP” ). On May 29, 2007, all Petitioners and Respondent IP filed Exceptions to the RO. Respondent DEP filed Exceptions to the RO and Motion for Remand. ; On June 8, 2007, the FOPB filed a Reply to IP’s Exceptions and a Response to DEP’s Motion for Remand and Exceptions. The Lane Petitioners filed their Response to iP’s and DEP’s Exceptions. Respondent DEP filed Responses to the Exceptions filed . by the FOPB, the Lane Petitioners and IP. Respondent IP filed Responses to the Exceptions of FOPB, the Lane Petitioners and DEP. This matter is now before me for. final agency action. . _ BACKGROUND » Florida Pulp and Paper Company first began operating the Cantonment paper mill in. 1941. St. Regis Paper Company (St. Regis” ) acquired the mill in 1946. In 4984, Champion International Corporation (“Champion”) acquired the mill. Champion changed the product mix in 1986 from unbleached packaging paper to bleached products such a as printing and writing grades c of paper. In 2001, Champion merged with IP, and IP took over operation of the mill. The primary product of the mill continues to | be printing and writing paper. ' The mill s wastewater effluent i is discharged into Elevenmile Creek, which is a tributary of Perdido Bay. The creek flows southwest into the northeastern portion of Perdido Bay. Elevenmile Creek is a freshwater stream for most of its length but is . sometimes tidally affected one to two miles from its mouth. Elevenmile Creek is designated as a Class I water. Perdido Bay is approximately 28 square miles in area and is bordered by Escambia County on the east and Baldwin County, Alabama, on the west. The dividing line between ‘the states runs north and south in the approximate middle of Perdido Bay. U.S. Highway 98 crosses the Bay, going east and west, and forms the boundary between what is-often referred to as the “Upper Bay” and “Lower Bay.” The Bay is relatively shallow, especially | in the Upper Bay, ranging in depth between five and ten feet. Perdido Bay i is designated asa Class ill water. Sometime around 1900, a manmade navigation channel was cut through the narrow strip of land separating Perdido Bay from the Gulf of Mexico. The channel, called Perdido Pass, allowed the salt waters of the Gulf to move with the tides up into Perdido Bay. Depending on tides and freshwater inflows, the tidal waters can move into the most northern portions of Perdido Bay and even further, into its tributaries and wetlands. The Perdido River flows into the northwest portion of Perdido Bay. Itis primarily a freshwater river but itis sometimes tidally influenced at and near its mouth. The Perdido River was designated an Outstanding Florida Water (“OFW’) in 11979. At the north end of Perdido Bay, between Elevenmile Creek and the Perdido River, isa large tract of land owned by IP called the Rainwater Tract, The northern part of the tract is primarily freshwater wetlands. The southern partis a tidal marsh. Tee and Wicker Lakes are small (approximately 50 acres in total surface area) tidal ponds within the tidal marsh. Depending on the tides, the lakes can be as shallow as one foot, or several feet deep. A channel through the marsh allows boaters to gain access to Tee and Wicker Lakes from Perdido Bay. | ' Before 1995, the mill had to have both state and federal permits. The former Florida Department of Environmental Regulation (‘DER’) issued St. Regis an industrial wastewater operating permit in 1982 pursuant to Chapter 403, Florida Statutes. The United States Environmental Protection Agency ("EPA") issued St. Regis a National Pollutant Discharge Elimination System (“ NPDES") permit i in 1983 pursuant to the Clean Water Act. When it acquired the facility in 1984, Champion continued to operate the mill under these two permits. In 1986, Champion obtained a construction permit from DER to install the oxygen delignification technology and other improvements to its wastewater treatment plant (‘WWTP’) in conjunction with the conversion of the production process from an unbleached to a modified bleached kraft production - process. In 1987, Champion applied to DER for an operating permit-for its modified WWITP and also petitioned for a variance from the Class iI water quality standards in Elevenmile Creek for iron, specific conductance, zinc, and transparency. DER's . subsequent proposal to issue the operating permit and variance was formally challenged. In 1988, while the challenges to the DER permit and variance were still pending, Champion dropped its application for the operating permit and requested a . temporary operating permit ("TOP"), instead. In December 1989, DER and Champion entered into Consent Order No. 87-1398 (‘the 1989 Consent Order’). The 1989 Consent Order included an allegation by DER that the mill's wastewater discharge was causing violations of state water quality standards in Elevenmile Creek for dissolved oxygen (“DO”), un-ionized ammonia, and biological integrity. The 1989 Consent Order authorized the continued operation of the mill, but established a process for addressing the water quality problems in Elevenmile Creek and Perdido Bay and bringing the mill into compliance in the future. Champion was required to install equipment to increase the DO in its effluent within a year. Champion was also required to submit a plan of study and, 30 months after DER's approval of the plan of study, to submit a study report on the impacts of the mill's effluent on DO in Elevenmile Creek and Perdido Bay and recommend measures for reducing or eliminating adverse impacts. The study report was also supposed to address the other water quality violations caused by Champion. A comprehensive study of the Perdido Bay system was undertaken by a team of 24 scientists lead by Dr. Robert Livingston, an aquatic ecologist and professor at Florida State University. The initial three-year study by Dr. Livingston's team of scientists was followed bya series of related scientific studies, which are referred to collectively in the RO as “the Livingston studies.” The 1989 Consent Order had no expiration date, but it was tied to the TOP, , which had an expiration date of December 1, 1994. Champion was to be in compliance with all applicable water quality standards by that date. The mill was not in compliance with all water quality standards in December 1 994. No enforcement action was taken by the Department and no modification of the 1989 Consent Order or TOP was formally proposed that would have provided a point of entry to any members of the public who might have objected. instead, the Department agreed through correspondence with . Champion to allow Champion to pursue additional water quality studies and to investigate alternatives to its discharge to Elevenmile Creek. - In 1994 and 1995, Champion applied to renew its state and federal wastewater permits, which were about to expire. The Department and EPA notified Champion that its existing permits were administratively extended during the review of the new permit applications. Today, the Cantonment mill is still operating under the 1989 TOP which, due to the administrative extension, did not terminate in December 1994, as stated on its face. In November 1 995, following EPA's delegation of NPDES permitting authority to the Department, the Department issued an order combining the state and federal ‘operating permits into a single permit identified as Wastewater Permit Number FLO002526-002-IWF/MT. During the period from 1992 to 2001, more water quality studies were conducted and Champion investigated alternatives to discharging into upper Elevenmile Creek, including land application of the effluent and relocation of the discharge to lower Elevenmiie Creek or the Escambia River. . In September 2002, while Champion's 1994 permit renewal application was still pending at DEP, IP submitted a revised permit renewal application to upgrade the WWTP and relocate its discharge. The WwTP upgrades consist of converting toa. modified activated sludge treatment process, incteasing aeration, constructing storm surge ponds, and adding a process for pH adjustment. The new WWTP would have an average daily effluent discharge of 23.8 million gallons per day (‘MGD’). IP proposes to convey the treated effluent by-pipeline 10.7 miles to the 1,464-acre wetland tract owned by IP (contained within-the larger Rainwater Tract), where the effluent would be distributed over the wetlands as it flows to lower Elevenmile Creek and Upper Perdido Bay. IP revised its permit application again in October 2005, to obtain authorization to: reconfigure the mill to produce unbleached brown paper for various grades of boxes. If the mill is reconfigured, only softwood (pine) would be used in the new process. On April 12, 2005, the Department published notice of its intent fo issue a proposed permit, consent order, experimental wetland exemption, and waiver. The — Department authorizations would allow IP to change its industrial wastewater treatment system at the mill, construct an effluent distribution system within the wetland tract, construct the 10.7-mile pipeline to transport its treated wastewater to the wetlands, and discharge the treated wastewater into the wetlands. In April 2005, Mellita A. Lane, Jacqueline M. Lane, Zachary P. Lane, Peter A. Lane, and Sarah M. Lane (“Lane Petitioners”) filed identical petitions challenging the Department authorizations on numerous grounds. The Department forwarded the petitions to DOAH for assignment of an Administrative Law Judge (“ALJ”) and to conduct an evidentiary hearing. The Lane Petitioners subsequently amended their petitions. In May 2005, Friends of Perdido Bay, Inc., and James Lane filed a petition for | hearing to challenge the Department authorizations. The FOPB petition was forwarded to DOAH and the pending cases were consolidated for the fi nal hearing. The FOPB petition was subsequently amended. In October 2005, while the cases were pending, IP applied for a revision to its NPDES permit renewal application. The cases were abated so that the DEP could review and act on the permit revision. In January 2006, DEP issued a proposed revised | NPDES permit and a corresponding First Amendment to Consent Order. On July 26, 2006, the Department filed without objection a revision to the Consent Order. On July 31, 2006, the Department filed Joint Trial Exhibit 18 that integrated the Consent Order dated April 12, 2005, the First Amendment to Consent Order dated January 11, 2006, and the Department’s Notice of Minor Revision {o Consent Order filed on July 26, 2006. The DOAH Administrative Law Judge CALL") held a lengthy final hearing in these consolidated cases on May 31, June 1, 2, and.26 through 30, and July 17, 27, and 28, 2006. Prior to the hearing, the parties filed their Joint Pre-Hearing sit on May 24, 2006. The ALJ subsequenty submitted his RO on May 11, 2007. -

# 5
SIP PROPERTIES LIMITED PARTNERSHIP vs DEPARTMENT OF ENVIRONMENTAL REGULATION, 93-002950RU (1993)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida May 28, 1993 Number: 93-002950RU Latest Update: Jan. 11, 1994

The Issue The issue in this proceeding is whether four agency memoranda describing policy on mitigation for dredge and fill projects are unpromulgated rules and were relied on by the agency in violation of Section 120.535(1), F.S. During the hearing, and afterwards in writing, Petitioner sought leave to amend its pleadings to incorporate other policies allegedly relied on by the agency in the process of the dredge and fill application review. That request was denied in an order entered on August 23, 1993. Those policies are addressed in the recommended order in DOAH #93-3367.

Findings Of Fact Petitioner, SIP Properties Limited Partnership (SIP) is the record owner of the parcel at issue, approximately thirty-five (35) acres located in the southwest area of Orlando, Orange County, Florida. SIP proposes to prepare the site for commercial and office use by developing the site into separate parcels or lots with proposed uses such as restaurant or fast food establishments, offices and retail stores. Development of the site requires the construction of compensating storage ponds that will act as retention/detention ponds and filling the site. The proposed improvements will result in the filling of 7.47 acres and dredging of 0.42 acres of wetlands claimed to be jurisdictional by DEP. Based on statements made to SIP by staff regarding department "mitigation policies" applicable to SIP's dredge and fill permit application, SIP believed that department policy memoranda were applied during permit review. SIP attached these various memoranda regarding mitigation to its Petition for Administrative Determination of Violation of Rulemaking Requirement dated May 27, 1993, and identified these memoranda as nonrule policies utilized by the department. The department retains on file and makes available for use by its staff the identified memoranda. However, in this case the department did not rely on or apply the mitigation guidelines contained in the memoranda in SIP's Petition. Instead, it applied Part III of Chapter 17-3120, F.A.C. In Part III of Chapter 17-312, F.A.C., the agency has adopted rules addressing the mitigation issues contained in the memoranda in SIP's Petition. For example, the agency has adopted guidelines in rule 17-312.340(2), F.A.C., for applying ratios when mitigation involves creation of state waters, as in this case. The department presently relies on these rules when reviewing mitigation plans, and does not rely on the policy memos referenced in the petition. Determining the mitigation needed to successfully offset impacts from a project is difficult and depends on many factors, including hydrology, soils, planting methods, and monitoring plans. Determining what is needed to reasonably assure successful mitigation must be done on a case by case basis. Not enough is known about the subject to apply any particular set of directions and expect success. DEP is presently in the process of developing rules to further address most aspects of mitigation.

Recommendation Based on the foregoing, it is, hereby, RECOMMENDED: That the Department of Environmental Protection issue its Final Order granting SIP's dredge and fill permit #48-2086169, with the mitigation proposed by the applicant, and establishing an expiration date and monitoring and evaluation plan for determining success of the mitigation as provided in rules 17-312.320 and 17-312.350, F.A.C. DONE AND RECOMMENDED this 11th day of January, 1994, in Tallahassee, Leon County, Florida. MARY CLARK Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904)488-9675 Filed with the Clerk of the Division of Administrative Hearings this 11th day of January, 1994. APPENDIX The following constitute specific rulings on the findings of fact proposed by the parties. Petitioner's Proposed Findings 1.-3. Adopted in paragraph 2. 4.-6. Adopted in paragraph 7. 7.-8. Rejected as unnecessary. 9. Adopted in paragraph 8. 10.-11. Adopted in substance in paragraph 9. 12. Adopted in substance in paragraph 10. 13.-16. Rejected as unnecessary Adopted in paragraphs 11 and 12. Rejected as unnecessary. 19.-21. Adopted in substance in paragraph 13. 22.-23. Adopted in substance in paragraph 14. 24.-25. Adopted in paragraph 15. Adopted in paragraph 16. Rejected as contrary to the weight of evidence. Adopted in paragraph 16. Substantially rejected as contrary to the greater weight of evidence. Adopted in part in paragraph 17, otherwise rejected as immaterial. Rejected as immaterial. Adopted in paragraph 18. Rejected as immaterial. The agency witnesses established that the vegetation along the canal evidences the physical connection and there is evidence that water flows from the site into the canal. Rejected as unsubstantiated by reliable competent evidence. Adopted in substance in paragraph 22. 36.-40. Rejected as unsupported by reliable competent evidence. Rejected as immaterial. Rejected as unsupported by the weight of evidence. Rejected as unnecessary, and as to characterization of merely "relic" wetlands, unsupported by the weight of evidence. Rejected (the conclusion of jurisdictional limit) as unsupported by the greater weight of evidence. 45.-53. Rejected as immaterial or unnecessary. 54.-56. Adopted in paragraphs 33 and 34. 57. Adopted, as to the limited function, in paragraphs 22 and 23. 58. Adopted in paragraph 26. 59.-60. Adopted in paragraph 23. 61. Rejected, as to the absolute conclusion of "no function", as contrary to the greater weight of evidence. 62. Adopted in paragraph 25. 63.-64. Adopted in paragraph 26. Rejected as unnecessary. Adopted in paragraph 30. Adopted in paragraph 34. Adopted in substance in paragraph 31. Adopted in substance in paragraphs 30 and 34. Adopted in paragraph 31. 71.-73. Adopted in paragraph 33. 74.-77. Rejected as unnecessary. 78.-79. Adopted in paragraph 31. 80.-81. Adopted in paragraph 35. Rejected as unnecessary. Adopted in paragraph 33. 84.-90. Rejected as unnecessary. Respondent's Proposed Findings Adopted in paragraph 15. 2.-3. Adopted in paragraph 16. 4.-5. Adopted in paragraph 17. Adopted in paragraph 15. Adopted in paragraph 17. Adopted in paragraph 16. Rejected as unnecessary and as to "binding" effect, unsupported by the weight of evidence. Adopted in paragraph 19. 11.-15. Adopted in substance in paragraph 21. 16. Rejected as contrary to the weight of evidence and inconsistent with proposed findings #18 with regard to the constant level in the canal. 17.-18. Adopted in substance in paragraphs 21 and 23. 19.-21. Adopted in paragraphs 19 and 20. 22.-26. Adopted in summary in paragraph 21. Adopted in paragraph 27. Adopted in substance in paragraphs 1 and 2. Adopted in paragraph 2. Adopted in part in paragraph 16. That the forests are "healthy and viable" is rejected as unsupported by the weight of evidence. Adopted in substance in paragraph 17. Adopted in part in paragraph 25; otherwise rejected as contrary to the weight of evidence. 33.-34. Adopted in part in paragraph 27; otherwise rejected as contrary to the weight of evidence. 35.-37. Rejected as contrary to the weight of evidence. 38.-43. Rejected as unnecessary. 44. Rejected as contrary to the weight of evidence. The stormwater management plan and mitigation will restore the stormwater treatment functions. 45.-47. Adopted in substance in paragraph 30. Rejected as substantially contrary to the greater weight of evidence (as to the negative impact). Adopted in part, as to water quality problems generally, but rejected as to the ultimate conclusion, as contrary to the greater weight of evidence. Rejected as unnecessary. 51.-52. Adopted in summary in paragraph 31. 53.-54. Rejected as cumulative and unnecessary. 55. Rejected as contrary to the greater weight of evidence. COPIES FURNISHED: Virginia B. Wetherell, Secretary Department of Environmental Protection Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Kenneth Plante, General Counsel Department of Environmental Protection Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Ronald M. Schirtzer, Esquire Martha H. Formella, Esquire R. Duke Woodson, Esquire FOLEY & LARDNER 111 North Orange Avenue, Suite 1800 Orlando, Florida 32801 Douglas H. MacLaughlin, Esquire John L. Chaves, Esquire Rosanne G. Capeless, Certified Legal Intern Department of Environmental Protection Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32399-2400

Florida Laws (8) 120.52120.54120.57120.68373.414403.4127.217.47
# 6
FRIENDS OF PERIDIDO BAY, INC., AND JAMES LANE vs DEPARTMENT OF ENVIRONMENTAL PROTECTION AND INTERNATIONAL PAPER COMPANY, 05-001981 (2005)
Division of Administrative Hearings, Florida Filed:Pensacola, Florida May 31, 2005 Number: 05-001981 Latest Update: Aug. 09, 2007

Conclusions On May 11, 2007, the Division of Administrative Hearings (‘DOAH’) submitted a _ Recommended Order (“RO”) to the Department of Environmental Protection (‘DEP’) i in . these consolidated proceedings. Copies of the RO were served upon the Petitioners, Mellita A. Lane, Jacqueline M. Lane, Peter A. Lane, (“Lane Petitioners”); Friends of Perdido Bay,.Inc., and James A. Lane (“FOPB”); and the Co-Respondent, International Paper Company (“IP” ). On May 29, 2007, all Petitioners and Respondent IP filed Exceptions to the RO. Respondent DEP filed Exceptions to the RO and Motion for Remand. ; On June 8, 2007, the FOPB filed a Reply to IP’s Exceptions and a Response to DEP’s Motion for Remand and Exceptions. The Lane Petitioners filed their Response to iP’s and DEP’s Exceptions. Respondent DEP filed Responses to the Exceptions filed . by the FOPB, the Lane Petitioners and IP. Respondent IP filed Responses to the Exceptions of FOPB, the Lane Petitioners and DEP. This matter is now before me for. final agency action. . _ BACKGROUND » Florida Pulp and Paper Company first began operating the Cantonment paper mill in. 1941. St. Regis Paper Company (St. Regis” ) acquired the mill in 1946. In 4984, Champion International Corporation (“Champion”) acquired the mill. Champion changed the product mix in 1986 from unbleached packaging paper to bleached products such a as printing and writing grades c of paper. In 2001, Champion merged with IP, and IP took over operation of the mill. The primary product of the mill continues to | be printing and writing paper. ' The mill s wastewater effluent i is discharged into Elevenmile Creek, which is a tributary of Perdido Bay. The creek flows southwest into the northeastern portion of Perdido Bay. Elevenmile Creek is a freshwater stream for most of its length but is . sometimes tidally affected one to two miles from its mouth. Elevenmile Creek is designated as a Class I water. Perdido Bay is approximately 28 square miles in area and is bordered by Escambia County on the east and Baldwin County, Alabama, on the west. The dividing line between ‘the states runs north and south in the approximate middle of Perdido Bay. U.S. Highway 98 crosses the Bay, going east and west, and forms the boundary between what is-often referred to as the “Upper Bay” and “Lower Bay.” The Bay is relatively shallow, especially | in the Upper Bay, ranging in depth between five and ten feet. Perdido Bay i is designated asa Class ill water. Sometime around 1900, a manmade navigation channel was cut through the narrow strip of land separating Perdido Bay from the Gulf of Mexico. The channel, called Perdido Pass, allowed the salt waters of the Gulf to move with the tides up into Perdido Bay. Depending on tides and freshwater inflows, the tidal waters can move into the most northern portions of Perdido Bay and even further, into its tributaries and wetlands. The Perdido River flows into the northwest portion of Perdido Bay. Itis primarily a freshwater river but itis sometimes tidally influenced at and near its mouth. The Perdido River was designated an Outstanding Florida Water (“OFW’) in 11979. At the north end of Perdido Bay, between Elevenmile Creek and the Perdido River, isa large tract of land owned by IP called the Rainwater Tract, The northern part of the tract is primarily freshwater wetlands. The southern partis a tidal marsh. Tee and Wicker Lakes are small (approximately 50 acres in total surface area) tidal ponds within the tidal marsh. Depending on the tides, the lakes can be as shallow as one foot, or several feet deep. A channel through the marsh allows boaters to gain access to Tee and Wicker Lakes from Perdido Bay. | ' Before 1995, the mill had to have both state and federal permits. The former Florida Department of Environmental Regulation (‘DER’) issued St. Regis an industrial wastewater operating permit in 1982 pursuant to Chapter 403, Florida Statutes. The United States Environmental Protection Agency ("EPA") issued St. Regis a National Pollutant Discharge Elimination System (“ NPDES") permit i in 1983 pursuant to the Clean Water Act. When it acquired the facility in 1984, Champion continued to operate the mill under these two permits. In 1986, Champion obtained a construction permit from DER to install the oxygen delignification technology and other improvements to its wastewater treatment plant (‘WWTP’) in conjunction with the conversion of the production process from an unbleached to a modified bleached kraft production - process. In 1987, Champion applied to DER for an operating permit-for its modified WWITP and also petitioned for a variance from the Class iI water quality standards in Elevenmile Creek for iron, specific conductance, zinc, and transparency. DER's . subsequent proposal to issue the operating permit and variance was formally challenged. In 1988, while the challenges to the DER permit and variance were still pending, Champion dropped its application for the operating permit and requested a . temporary operating permit ("TOP"), instead. In December 1989, DER and Champion entered into Consent Order No. 87-1398 (‘the 1989 Consent Order’). The 1989 Consent Order included an allegation by DER that the mill's wastewater discharge was causing violations of state water quality standards in Elevenmile Creek for dissolved oxygen (“DO”), un-ionized ammonia, and biological integrity. The 1989 Consent Order authorized the continued operation of the mill, but established a process for addressing the water quality problems in Elevenmile Creek and Perdido Bay and bringing the mill into compliance in the future. Champion was required to install equipment to increase the DO in its effluent within a year. Champion was also required to submit a plan of study and, 30 months after DER's approval of the plan of study, to submit a study report on the impacts of the mill's effluent on DO in Elevenmile Creek and Perdido Bay and recommend measures for reducing or eliminating adverse impacts. The study report was also supposed to address the other water quality violations caused by Champion. A comprehensive study of the Perdido Bay system was undertaken by a team of 24 scientists lead by Dr. Robert Livingston, an aquatic ecologist and professor at Florida State University. The initial three-year study by Dr. Livingston's team of scientists was followed bya series of related scientific studies, which are referred to collectively in the RO as “the Livingston studies.” The 1989 Consent Order had no expiration date, but it was tied to the TOP, , which had an expiration date of December 1, 1994. Champion was to be in compliance with all applicable water quality standards by that date. The mill was not in compliance with all water quality standards in December 1 994. No enforcement action was taken by the Department and no modification of the 1989 Consent Order or TOP was formally proposed that would have provided a point of entry to any members of the public who might have objected. instead, the Department agreed through correspondence with . Champion to allow Champion to pursue additional water quality studies and to investigate alternatives to its discharge to Elevenmile Creek. - In 1994 and 1995, Champion applied to renew its state and federal wastewater permits, which were about to expire. The Department and EPA notified Champion that its existing permits were administratively extended during the review of the new permit applications. Today, the Cantonment mill is still operating under the 1989 TOP which, due to the administrative extension, did not terminate in December 1994, as stated on its face. In November 1 995, following EPA's delegation of NPDES permitting authority to the Department, the Department issued an order combining the state and federal ‘operating permits into a single permit identified as Wastewater Permit Number FLO002526-002-IWF/MT. During the period from 1992 to 2001, more water quality studies were conducted and Champion investigated alternatives to discharging into upper Elevenmile Creek, including land application of the effluent and relocation of the discharge to lower Elevenmiie Creek or the Escambia River. . In September 2002, while Champion's 1994 permit renewal application was still pending at DEP, IP submitted a revised permit renewal application to upgrade the WWTP and relocate its discharge. The WwTP upgrades consist of converting toa. modified activated sludge treatment process, incteasing aeration, constructing storm surge ponds, and adding a process for pH adjustment. The new WWTP would have an average daily effluent discharge of 23.8 million gallons per day (‘MGD’). IP proposes to convey the treated effluent by-pipeline 10.7 miles to the 1,464-acre wetland tract owned by IP (contained within-the larger Rainwater Tract), where the effluent would be distributed over the wetlands as it flows to lower Elevenmile Creek and Upper Perdido Bay. IP revised its permit application again in October 2005, to obtain authorization to: reconfigure the mill to produce unbleached brown paper for various grades of boxes. If the mill is reconfigured, only softwood (pine) would be used in the new process. On April 12, 2005, the Department published notice of its intent fo issue a proposed permit, consent order, experimental wetland exemption, and waiver. The — Department authorizations would allow IP to change its industrial wastewater treatment system at the mill, construct an effluent distribution system within the wetland tract, construct the 10.7-mile pipeline to transport its treated wastewater to the wetlands, and discharge the treated wastewater into the wetlands. In April 2005, Mellita A. Lane, Jacqueline M. Lane, Zachary P. Lane, Peter A. Lane, and Sarah M. Lane (“Lane Petitioners”) filed identical petitions challenging the Department authorizations on numerous grounds. The Department forwarded the petitions to DOAH for assignment of an Administrative Law Judge (“ALJ”) and to conduct an evidentiary hearing. The Lane Petitioners subsequently amended their petitions. In May 2005, Friends of Perdido Bay, Inc., and James Lane filed a petition for | hearing to challenge the Department authorizations. The FOPB petition was forwarded to DOAH and the pending cases were consolidated for the fi nal hearing. The FOPB petition was subsequently amended. In October 2005, while the cases were pending, IP applied for a revision to its NPDES permit renewal application. The cases were abated so that the DEP could review and act on the permit revision. In January 2006, DEP issued a proposed revised | NPDES permit and a corresponding First Amendment to Consent Order. On July 26, 2006, the Department filed without objection a revision to the Consent Order. On July 31, 2006, the Department filed Joint Trial Exhibit 18 that integrated the Consent Order dated April 12, 2005, the First Amendment to Consent Order dated January 11, 2006, and the Department’s Notice of Minor Revision {o Consent Order filed on July 26, 2006. The DOAH Administrative Law Judge CALL") held a lengthy final hearing in these consolidated cases on May 31, June 1, 2, and.26 through 30, and July 17, 27, and 28, 2006. Prior to the hearing, the parties filed their Joint Pre-Hearing sit on May 24, 2006. The ALJ subsequenty submitted his RO on May 11, 2007. -

# 7
RICHARD STAUFFER, STEVEN MCCALLUM, CY PLATA, AND LESLIE NEUMANN vs JOHN RICHARDSON (JANET RICHARDSON) AND DEPARTMENT OF ENVIRONMENTAL PROTECTION, 96-003784 (1996)
Division of Administrative Hearings, Florida Filed:Spring Hill, Florida Aug. 12, 1996 Number: 96-003784 Latest Update: Jan. 30, 1997

The Issue Whether Respondent Richardson’s application for a wetlands resource permit to construct a private road and bridge through wetlands should be denied for failing to provide mitigation to offset the impacts to existing wetlands. Whether Respondent Richardson had provided the Department with reasonable assurance that he or she owns or has sufficient authorization to use certain land in mitigation to offset the wetland impacts.

Findings Of Fact In January of 1990, John Richardson applied to the Department for a wetland resource (dredge and fill) permit under Section 403.918, Florida Statutes to construct a private road and bridge through wetlands. The proposed project would impact 0.032 acres of wetland. The proposed project is not located in an Outstanding Florida Water (OFW). The proposed project would adversely affect the following: the conservation of fish and wildlife; the fishing, recreational values, and marine productivity in the vicinity of the proposed project; and the current condition and relative value of functions being performed by the wetlands impacted by the project. The proposed project would be permanent in nature. The proposed project would not meet the criteria of Section 403.918(2)(a) Florida Statutes, without mitigation adequate to offset the impacts to wetlands. To provide adequate mitigation for the proposed project, Respondent John Richardson proposed to create and preserve 0.029 acres of new wetlands and preserve 4.35 acres of existing wetlands. The preservation would consist of granting to the Department a perpetual conservation easement over the mitigation wetlands. Respondent John Richardson represented to the Department that he was the record owner or had permission to use the land that he offered for mitigation. The Department reasonably relied on that representation. The mitigation proposed by Respondent John Richardson would be adequate to offset the impacts to wetlands resulting from the proposed project. On March 4, 1992, the Department issued to John Richardson a wetlands resource permit for the proposed project. The Department was not aware, before it issued this permit, that John Richardson might not own or have permission to use the mitigation land. The Department was substantially justified in issuing the permit to John Richardson on March 4, 1992. Specific conditions 28-31 of that permit required Respondent John Richardson to grant the Department a conservation easement over the mitigation land within thirty days after issuance of the permit. Respondent John Richardson failed to grant the Department the required conservation easement, and failed to publish notice of the Department’s action. On July 22, 1996, Petitioners filed a timely petition with the Department challenging the Department’s issuance of the March 4, 1992, permit to Respondent John Richardson. On September 11, 1996, Janet Richardson filed an application with the Department for transfer of the March 4, 1992, permit to her following the dissolution of marriage with John Richardson. By letter dated October 11, 1996, the Department requested Janet Richardson to provide additional documentation to show that she either owns the mitigation land or has permission to use that land. Janet Richardson was required to provide a legal survey drawing depicting the mitigation land, property records showing ownership of that land, and a notarized statement from the land owner authorizing her to use that land. The Department specifically advised Janet Richardson that it could not approve the proposed project if she failed to submit this requested documentation to the Department prior to the final hearing. Janet Richardson failed to provide the requested documentation by the date of the final hearing in this matter, or subsequently. As of November 6, 1996, no work had begun on the proposed project. At the hearing, the Department adequately explained its change in position from deciding to issue the permit (on March 4, 1992) and proposing denial of the permit (on November 6, 1996). The Department relies on an applicant’s representations regarding ownership of or right to use land unless a problem is brought to the Department’s attention. In this case, the Department was not aware that there was a problem with the applicant’s right to use the mitigation land until the petition was filed with the Department on July 22, 1996. Janet Richardson failed to provide proof that she either owns or is authorized to use the land to mitigate the impacts to wetlands from the proposed project. Without such proof, Janet Richardson failed to prove that she could mitigate those same impacts from the proposed project.

Recommendation Upon the foregoing findings of fact and conclusions of law, it is RECOMMENDED that the Department of Environmental Protection enter a Final Order denying Respondent Richardson’s request for a wetlands resource permit for the proposed project.ONE AND ORDERED this 17th day of December, 1996, in Tallahassee, Florida. DANIEL M. KILBRIDE Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 SUNCOM 278-9675 Fax Filing (904) 921-6847 Filed with the Clerk of the Division of Administrative Hearings this 17th day of December, 1996. COPIES FURNISHED: Richard Stauffer Post Office Box 97 Aripeka, Florida 34679-097 Cy Plata Post Office Box 64 Aripeka, Florida 34679 Steven McCallum Post Office Box 484 Aripeka, Florida 34679 Leslie Neumann Post Office Box 738 Aripeka, Florida 34679 John Richardson 700 West Broad Street Brooksville, Florida 34607 Janet Richardson 1603 Osowaw Boulevard Springhill, Florida 34607 Thomas I. Mayton, Jr., Esquire Department of Environmental Protection 3900 Commonwealth Boulevard, Mail Station 35 Tallahassee, Florida 32399-3000 Perry Odom, Esquire Department of Environmental Protection 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 Virgina B. Wetherell, Secretary Department of Environmental Protection 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000

Florida Laws (2) 120.57267.061
# 8
BERNARD SPINRAD AND MARION SPINRAD vs WILLIAM GUERRERO, CHRISTINA BANG, A/K/A CHRISTINA GUERRERO, AND DEPARTMENT OF ENVIRONMENTAL PROTECTION, 13-002254 (2013)
Division of Administrative Hearings, Florida Filed:Marineland, Florida Jun. 14, 2013 Number: 13-002254 Latest Update: Jul. 22, 2015

The Issue The issue to be determined is whether the applicants, William Guererro and Christina Bang, a/k/a Christina Guerrero (Applicants), are entitled to issuance of a Consolidated Environmental Resource Permit and State Lands Approvals for various structures on the Applicants’ property at 58458 Overseas Highway, Marathon, Florida.

Findings Of Fact The Parties Petitioners Bernard Spinrad and Marian Spinrad are the owners of adjoining parcels of property with the addresses of 58418 and 58420 Overseas Highway, Marathon, Florida. They acquired the property in December 2001. They recently completed construction of two residential structures on the properties. The structure at 58418 Overseas Highway is currently listed for sale. The structure at 58420 Overseas Highway is a vacation rental property. Neither structure is Petitioners’ permanent residence. The DEP is the state agency with the power and duty to regulate activities in waters of the state pursuant to chapter 373, Florida Statutes. The DEP also serves as staff to the Board of Trustees of the Internal Improvement Trust Fund (“Board of Trustees”) to review and act on activities on state sovereignty submerged lands under chapter 253. The Applicants, are the owners of adjoining parcels of property with the address of 58478 Overseas Highway, Marathon, Florida (the Property). They purchased the Property in June 2010. The structures that are the subject of the Permit are to be constructed near or waterward of the shoreline of the Property. The Property The Property is located on Grassy Key, an island in the middle Florida Keys, within limits of the city of Marathon, Monroe County, Florida. U.S. Highway 1 passes through Grassy Key. The Property -- as is that of Petitioners -- is situated between U.S. Highway 1 and the open waters of the Atlantic Ocean. In the early part of the 20th century, a portion of Grassy Key was platted as the Crains Subdivision. The properties owned by Applicants and Petitioners are within the Crains Subdivision. During the periods of time directly relevant hereto, the Property has been owned by Burgess Levine, who owned the property during the period prior to the October 2006, landfall of Hurricane Wilma until June 2010, and by Applicants, who have owned the Property since June, 2010. Grassy Key Grassy Key is three-miles long, and has 6800 feet of beaches, none of which are designated as critically eroded. The island fronts the Atlantic Ocean to the east, and the more protected waters of Florida Bay to the west. The waters along the Atlantic Ocean shoreline of Grassy Key in the area at issue are shallow, with an extremely flat bottom having a very gradual slope of approximately 1 to 30, meaning there is a one foot vertical change over 30 horizontal feet. The mean tide range at the Property is about 1.7 feet. Under normal conditions, the stretch of Grassy Key at issue is fairly characterized as a zero-wave energy shoreline. Waves break well offshore and there is negligible wave energy propagating beyond that point. What shoreline energy exists is produced by small tide currents and wind-shear on the water surface that moves water along the shoreline. The direction of the water movement is dependent on tides and wind direction, with the predominant direction being from north to south. Erosive and other significant changes to the shoreline of Grassy Key, including that stretch fronting the Property, are event driven, meaning when there is a coastal storm that causes a rise in the water level, substantially higher than the astronomical tide, waves can propagate onto the shoreline of Grassy Key. The wind and waves can come from virtually any direction depending on the storm. A storm of greater intensity will create higher energy-wave conditions. Although storm conditions may only occur over 1 to 3 percent of a given year, with the rest of the year having zero-wave energy, on average the coastline may be considered to be of moderate-wave energy. The beach sediment along the Grassy Key shoreline in all areas pertinent hereto consists of calcareous material, made up of the breakdown of corals and coralling algae, with a significant fraction of other detrital marine material. The upper beaches of Grassy Key, including that on the Property, generally consist of coarse, calcareous sand with a small fraction of calcareous silt-size particles. The inter-tidal areas along Grassy Key consist of predominantly fine calcareous sand, with a greater fraction of calcareous silt. Extending out into the nearshore area all along Grassy Key, including that fronting the properties owned by Petitioners and Applicants, the sediment becomes a very fine calcareous sand, with a greater fraction of the material being calcareous silts and clays, and with a substantial amount of organic mud of a marine origin, classified as Islamorada muck. Since at least the 1970s, one wading in the nearshore waters along Grassy Key could expect to sink into the surface muck to a depth of anywhere from six inches to two feet. The depth of muck becomes less as one moves further out and approaches the offshore Thalassia beds. Although some areas offer more resistance than others, it is routine to experience difficulty in walking and wading along the coast of Grassy Key because of the high percentage of clays and silts in the substrate. The band of muck narrows as one proceeds towards the northern stretches of Grassy Key, until one reaches the furthest areas to the northeast where the nearshore transitions to exposed rock and hard bottom. The surface muck that exists in the nearshore waters of Grassy Key, having a sizable component of decaying organic material, gives off an odor of hydrogen sulfide when disturbed that some find to be unpleasant. The odor is a naturally- occurring condition of the sediment, and is common in mucky areas all around the southern coasts of Florida. The suggestion that the shoreline in the vicinity of the Petitioners’ property, and that of Applicants, was a naturally occurring white, sandy beach is contrary to the greater weight of the evidence. To the extent the shoreline at Petitioners’ property may have been temporarily altered by the overwash from Hurricane Wilma as discussed herein, Petitioners’ own post-Wilma man-made efforts at beach stabilization, or the redistribution of sediments occasioned by Hurricanes Isaac and Sandy in 2012, the evidence demonstrates the “mucky” condition described herein to be more consistent with the natural and long-standing conditions of Grassy Key. Thus, as Grassy Key exists in the present time, one may expect to encounter six inches to two feet of loose muck anywhere along the nearshore area. Close to shore of Grassy Key are scattered beds of Halodule, a species of seagrass that tends to emerge and grow in shallow waters. The growth of Halodule is influenced by the nature of the sediments, the salinity temperature, and clarity of the water. Storm events have a significant effect on its growth. Given its transient nature, Halodule may vary in any given area from nonexistent, to spotty, to well-established beds. As one moves further offshore, the Halodule transitions to large, continuous beds of Thalassia. Thalassia grows in deeper water, and is common to a depth of about 12 feet. Being deeper and less affected by storm energy, the line of the Thalassia beds off of Grassy Key has not substantially changed over time. As wind and waves come across the grass beds, and as tides ebb and flow, grass blades are cropped. The amount of grass varies seasonally to a degree. The cropped and dislodged seagrasses, along with other organic material entrained therein, are naturally carried by the tides and wind and stranded along the shoreline. The stranded material is known as wrack, and the line of stranded material is known as the wrack line. Grassy Key is well known for the large seagrass wracks that pile up on the shoreline. A wrack line is a normal and natural occurrence in marine environments like that of Grassy Key, and can be a good indicator of the upper edge of the water action at a particular time. The cropping and dislodging of seagrass is accentuated during major or minor storm events. During Hurricane Rita in 2005, a very large seagrass wrack was blown onto the shoreline of Grassy Key. It was subsequently blown back out to sea by the overwash from Hurricane Wilma. The decomposition of the seagrass and other organic materials creates a significant odor that is not uncommon. That odor of decomposing material is well-recognized as being associated with Grassy Key. Areas along the shoreline of Grassy Key have been used by sea turtles for nesting. However, the nature of the substrate in the area of the Property is not optimal for nesting. Generally, sea turtles require a nesting site with 15 to 20 inches of sand above the water table so as to allow them to dig a suitably deep and dry cavity for their eggs. The natural substrate along the section of Grassy Key at issue is coarser and more difficult to dig into, and does not have the depth of sand for the best chance of a successful nest. Despite the nature of the substrate, Petitioner testified as to her observation of turtle nests along her property in each year from 2006 through 2010. Since the SW Groin, the Mid-bulkhead, and the NE Groin were all in existence and functioning during that period, with work to the SW Groin having been completed by 2008, the preponderance of the evidence demonstrates that those structures have no effect on the success or failure of sea turtles to nest along the property. To the extent nesting has been disrupted since 2011, the most logical inference that can be drawn from the evidence is that such disruption is the result of the Mid-Jetty Extension, which is slated for removal under the terms of the Permit. The preponderance of the evidence demonstrates that the structures and activities authorized by the Permit will have no adverse effect on sea turtles. Hurricane Wilma In October, 2005, Grassy Key was pounded by Hurricane Wilma. The storm passed to the north, and created a substantial storm surge that moved from west to east across Grassy Key. The storm surge created a “ridge and runnel” effect on the Atlantic facing shoreline, with the channelization of the storm tide flow creating erosion and gullies on upland shore-adjacent properties. The storm surge and flooding across Grassy Key caused substantial wash-outs of sand; transported a large volume of sandy, upland sediments into the nearshore waters of the Atlantic Ocean; and created washover “fans” of material along the shoreline of Grassy Key. The effects of the Hurricane Wilma storm surge manifested just north of the Property, became substantial at the Property, and continued south down the shoreline for a considerable distance. At the Property, sand was pushed from 50 to 100 feet waterward from the existing shoreline, and a substantial runout was created running parallel and north of the SW Jetty. The sand pushed into the water buried everything in its path, including seagrasses. In short, the post-Wilma shoreline from the Property south along Grassy Key was left in a completely disrupted state. The nearshore waters fronting the properties owned by Petitioners and Applicants were affected by the deposition of sandy, upland sediments, which temporarily created areas of substantially harder-packed sediment. Over time, as the shoreline equilibrated and the sandy sediment distributed through a broader area, more typical shoreline conditions returned. The photographic evidence demonstrates that the Mid- bulkhead and the SW jetty structures were impacted by the Hurricane Wilma storm surge. In addition, the sandy area between the mid-bulkhead and the SW jetty was pushed seaward from its previous location. The scars from Hurricane Wilma remain evident through the most recent aerial photographs received in evidence. It is visually apparent that seagrass, though reappearing in patches, has not reestablished in the nearshore areas along the affected shoreline of Grassy Key -- including the areas in front of the Property and the property owned by Petitioners -- to the extent that it existed prior to the storm. Post-Wilma Activities When Hurricane Wilma hit, the Property was owned by Burgess Lea Levine. Not long after Hurricane Wilma, Ms. Levine shored up the SW Jetty, and performed work in the “beach” area between the mid-bulkhead and the SW jetty. The photographic evidence also supports a finding that the rock outline of the Mid-jetty was reestablished to its pre-Wilma configuration. The repairs to the SW Jetty resulted in a structure that is virtually indistinguishable in size and shape to the SW Jetty as it presently exists. The wrack line at the beach area after it was “worked” following the passage of Wilma, shows the area in which work was done to be generally consistent with -- though slightly seaward of -- the 2005 post-Wilma shoreline. In 2008, Ms. Levine applied for a series of exemptions and for consent of use for state-owned lands for “shoreline repair, replace earthen ramp with a concrete ramp, repair wood deck, replace mooring piles & maintenance dredge existing channel w/in Atlantic Ocean.” On September 19, 2008, the DEP issued a regulatory authorization and proprietary submerged land approval. The Rights of Affected Parties that accompanied the September 19, 2008, notice provided that “[t]his letter acknowledges that the proposed activity is exempt from ERP permitting requirements” and that “this determination shall expire after one year.” The notice of Rights of Affected Parties did not apply to the proprietary authorization. At some time after issuance of the regulatory authorization, Ms. Burgess initiated additional work to repair the SW Jetty. The photographic evidence, which is persuasive, indicates that the work on the SW Jetty, including the concrete cap, was complete by the end of 2008. When Applicants purchased the Property, the determination of exemption issued in 2008 had, by application of the notice of Rights of Affected Parties, expired. Shortly after the Applicants purchased the property, they had the existing family home demolished. Applicants intend to construct a winter vacation home for their personal use on the property. 2012 Storms In August and October 2012, Grassy Key was subject to event-driven conditions as a result of the passage of Hurricanes Isaac and Sandy. Those storms redistributed large areas of sediments that had been moved offshore by the effects of Hurricane Wilma. The Proposed Permit The February 20, 2013, Permit provides that the structures described herein do not require the issuance of an Environmental Resource Permit, subject to the criteria and conditions in Florida Administrative Code Rule 40E-4.051. The Permit provides that the boat ramp is eligible to use the general permit in Florida Administrative Code Rule 62-330.417, the repair and replacement of the dock is exempt pursuant to section 403.813(1)(b), Florida Statutes, the maintenance dredging of the Channel is exempt pursuant to section 403.813(1)(f), and that the repair and replacement of the NW Jetty, the SW Jetty, and the Mid-bulkhead are exempt because the structures are “historic in nature and pre-dates Department regulations.” In addition to the regulatory authorizations, the Permit granted proprietary authorization by Letter of Consent for the dock pursuant to Florida Administrative Code Rule 18- 21.005(1)(c)4., and for the Channel, the NW Jetty, the SW Jetty, and the Mid-bulkhead pursuant to rule 18-21.005(1)(c)7. The Permit established the mean high-water line as that existing in 1974 and depicted on the “Richmond Survey.” Proprietary authorization for the boat ramp was determined to be unnecessary due to its location above the mean high-water line. Finally, proprietary authorization for the “Sandy Area” or beach between the Mid-bulkhead and SW Jetty was granted by Letter of Consent pursuant to rule 18-21.005(1). On September 20, 2013, the DEP filed a Notice of Additional Grounds for Exemption Determination, in which it found each of the structures subject to the regulatory review to “have only minimal or insignificant individual or cumulative adverse impacts on water resources” and to thus be exempt from the need to obtain an Environmental Resource Permit pursuant to section 373.406(6), Florida Statutes. On December 12, 2013, Applicants filed a Notice of Filing Proposed Changes to the Pending Agency Action in which they agreed to certain additional conditions, and which referenced the October 1, 2013, repeal of rule 40E-4.051, and its replacement by the “Statewide ERP rules.” For purposes of this de novo proceeding, the proposed Permit at issue includes the February 20, 2013, Permit; the September 20, 2013, Notice of Additional Grounds for Exemption Determination; and the December 12, 2013, Notice of Filing Proposed Changes to the Pending Agency Action. The Proposed Structures Groins There has been some confusion relating to the names of the structures that are subject to the proposed Permit. Two of the structures are referred to as jetties, the NE Jetty and the SW Jetty, and the middle structure is referred to as the Mid- bulkhead. A jetty is a navigation structure that is constructed at a barrier inlet. Its purpose is to stabilize the inlet and prevent shoaling by “jetting” current and wave-driven sand further offshore, such that the offshore bar is moved into deep enough water to allow navigation in and out of the tidal inlet, and allowing the tidal current between the ocean and the receiving body of water to keep the inlet scoured and open. There are 48 jetties on the open coast of Florida, none of which are in the Florida Keys. A groin is a structure designed for shore protection purposes. A groin is typically aligned perpendicular to the shoreline, or “shore normal.” The structures identified in the Permit as the NE Jetty and the SW Jetty are clearly groins, and not jetties. The mid-bulkhead is a groin, generally for shore confinement, with a channel-facing bulkhead. For purposes of continuity, the structures will be identified by the names given them in the Permit. Since there is negligible wave energy along the shoreline normal conditions, the groins have little or no day- to-day effect on longshore transport. Under storm conditions, the structures affect longshore transport, as evidenced by accretional “fillets,” and function as shoreline protection and confinement structures. The rock groins provide shelter, habitat and structure for corals, sponges, lobster, and fish in the area. The preponderance of the evidence demonstrates that the groins authorized by the Permit will have no adverse effect on fish and wildlife resources. NE Jetty The NE Jetty was originally constructed in the early 1960s, likely concurrent with the dredging of the navigational channel. The quality of the aerial photographs of the period make it difficult to tell if the NE Jetty was a loosely-placed rock embankment or a more well-designed and constructed structure. However, the fillet of sand accreted to the north of the Channel demonstrates that the jetty was in existence and functioning as a shore-protection structure. By the 1970s, the NE Jetty had become overwhelmed by longshore sediment transport from the northeast. Sediment overtopped the NE Jetty and filled in the landward reaches of the Channel. At that point, ability of the NE Jetty to perform as a shore protection structure was compromised to the point that it could no longer hold the shoreline out of the basin or the landward portion of the Channel. The Mid-bulkhead became the dominant structural control over the shoreline and started to accrete the shoreline to the northeast. At some time between 1977 and 1981, the Channel was maintenance dredged pursuant to a permit issued by the Department of Environmental Regulation, DEP’s predecessor agency. The NE Jetty appeared on the plans for the maintenance dredging. Thus, the most reasonable inference that can be drawn from the evidence is that the NE Jetty was repaired and restored in conjunction with the approved maintenance dredging. By 1981, the NE Jetty had been restored as the dominant shore protection structure north of the Channel, and a fillet of accreted material had been reestablished. The aerial photographs from that period are not sufficiently distinct to determine the precise size, shape, and configuration of the NE Jetty at that time. However, there is no evidence of additional work having been performed on the NE Jetty between 1981 and 1985. By 1985, the NE Jetty existed in substantially the size, shape, and configuration as it existed at the time of Hurricane Wilma. Between 1981 and the 2005 arrival of Hurricane Wilma, the evidence is convincing that the NE Jetty was holding up the shoreline to the northeast and preventing sediment from filling in the upper reaches of the Channel. Although the evidence suggests that the NE Jetty had, by 2005, begun to show its age, the continuous presence of an accretional fillet demonstrates that it continued to serve its function as a shore-protection structure. Although the NE Jetty suffered damage from Hurricane Wilma, it continued to perform its shoreline protection function. Aerial photographs taken in 2009 and 2011 show a relatively distinct structure with a well-defined accretional fillet. Thus, the greater weight of the evidence demonstrates that, at the time of its repair in May 2011, the NE Jetty was a functional groin. The NE Jetty, as repaired in 2011, is of substantially the same size, shape, and location as the structure depicted in aerial photographs taken in 1985, 2009, and early 2011. Although the elevation of the structure was increased over its pre-repair elevation, the increase was that reasonably necessary to prevent the function of the structure from being compromised by the effects of age and weather. The work performed on the NE Jetty, consisting of new rock laid on top of the existing rock, constituted repair and maintenance of the existing structure. Since 2005, and at the present time, the shoreline north of the NE Jetty has reached a state of equilibrium and stability, and is not expected to change significantly from its current condition. The preponderance of the competent, substantial evidence demonstrates that the effect of the NE Jetty on the shoreline and water resources of Grassy Key in the vicinity of the properties owned by Applicants and Petitioners is minimal and insignificant. The sand and sediment accreted to the north of the NE Jetty since 1981 is in the range of 250 square feet. SW Jetty The aerial photographs from 19647/ demonstrate that some form of structure then existed at the location of the current SW Jetty. The structure is indistinct due to what appears to be sidecast material from a small channel in front of the property to the immediate south of the Property. By 1971, the SW Jetty had become more distinct. From that time forward, the SW Jetty, and its accompanying fillet of accreted material, appears in roughly the size and shape of the structure as it appeared immediately prior to the arrival of Hurricane Wilma. The SW Jetty was heavily impacted by Hurricane Wilma. The overwash from the storm created a substantial runout alongside the SW Jetty, and the post-storm aerials suggest that the jetty boulders were undermined and shifted from their more uniform 2003 appearance. Immediately after Hurricane Wilma, the owner of the Property commenced restoration and repair activities. As part of the activities, the SW Jetty was repaired with the addition of boulders, which were often three feet and every now and then as much as four feet across. The boulders, being irregularly shaped, could not be stacked like Legos®, so the repairs were not neatly within the precise pre-Wilma footprint. However, the repaired SW Jetty was substantially in the length and location as existed prior to Hurricane Wilma, though it may have had a slightly wider cross-section. By 2007, the work on the SW Jetty was complete, and it had assumed its present appearance with the addition of a concrete cap. Its appearance -- i.e. length, width, and location -- in 2007 and 2008 was not dissimilar from its appearance in 2003. As repaired, the SW Jetty effectively constitutes the same structure that it has been since its initial construction. From a coastal engineering perspective, the work that was performed on the SW Jetty, consisting generally of new rock laid on top of the existing rock, constituted repair and maintenance of the existing structure. Dr. Lin testified that between 1974 and 2011, the area to the southwest of the southwest jetty was “about equalized,” though it was “accreting a little bit.” Thus, the effect of the SW Jetty on the shoreline of Grassy Key in the vicinity of the properties owned by Applicants and Petitioners from 1974 to 2011 was minimal and insignificant. Dr. Lin testified that, since 2011, the same area had eroded. The only substantive shoreline change that logically accounts for that subsequent erosion is the Mid-bulkhead extension, which is slated for removal under the terms of the proposed Permit. Petitioner testified that she observed no adverse effects from activities on the Property until after February 2011.8/ Since work on the SW Jetty was complete by no later than 2008, Petitioner’s testimony supports a finding that the SW Jetty has had no measurable effect on the water resources in the vicinity of the properties owned by Applicants and Petitioners. The preponderance of the competent, substantial evidence demonstrates that the effect of the SW Jetty on the shoreline and water resources of Grassy Key in the vicinity of the properties owned by Applicants and Petitioners is minimal and insignificant. Mid-bulkhead The structure of the Mid-bulkhead first appeared as part of the sidecast material from the excavation of the navigation channel in 1964. It coalesced into a defined but smaller and more rudimentary structure in the 1971-1972 time period. At that time, it was acting as the predominant shore protection structure due to the overtopping of the NE Jetty with sediment, which also filled in the landward reaches of the Channel. By 1981, after the maintenance dredging of the Channel, the Mid-bulkhead had assumed substantially the size, shape, and location that it has currently. The Mid-bulkhead has a navigation function of protecting the landward extent of the Channel from the collapse of adjacent sand and sediment, and a shore protection and compartmentalization function. Those functions have been consistent since 1981. The Mid-bulkhead appears to have been subjected to the overwash of sand and sediment from Hurricane Wilma, though it maintained its shape and form. The outline of the Mid-bulkhead appears to be more well-defined after the initial post-Wilma repairs. In any event, the configuration and size of the Mid-bulkhead is substantially the same as it had been since 1981. At some point, the interior section of the Mid- bulkhead was topped with soil that is inconsistent with that naturally occurring in the area. That fill was confined, and brought the Mid-bulkhead to a more even grade with the rock outline, but could have had no measurable effect on the shoreline and water resources of Grassy Key in the vicinity of the properties owned by Applicants and Petitioners. The preponderance of the competent, substantial evidence demonstrates that the effect of the Mid-bulkhead is minimal and insignificant. Channel In 1961, the Department of the Army authorized dredging of a navigation channel at the Property. The approved channel was to be 700 feet long, 30 feet wide, and to a depth of five feet below mean low water. The Florida Trustees of the Internal Improvement Fund issued a letter of no objection. By 1964, the Channel that is the subject of this proceeding had been dredged, though not to the 700-foot length approved. Rather, the Channel was dredged to a length of approximately 290 feet. Much, if not all of the dredge spoil was sidecast, creating a rock structure alongside the Channel. Measurements taken during the course of this proceeding demonstrate that the initial dredging resulted in near vertical side slopes, which shows that the bailing of the bedrock was accomplished to the limits. The width of the Channel is from 28 feet to 32 feet wide, which is within an acceptable tolerance of the 30-foot approved width. In 1976, the then-owner of the Property sought a permit from the DEP’s predecessor, the Department of Environmental Regulation, to maintenance dredge the Channel to a dimension of 290 feet long and 30 feet wide, to a depth of minus 8-feet mean high water, and to construct a new rock jetty to extend 230 feet waterward from the existing terminus of the NE Jetty. Given the mean tide range of 1.7 feet at the Property, the depth of the proposed dredging would have been minus 6.3 feet mean low water, or 1.3 feet deeper than originally approved. The permit drawings depict the existing NE Jetty, the Channel boundary, the outline of the Mid-bulkhead, and the sidecast rock structure alongside the southern side of the Channel. The permit was denied. In 1977, the owner of the property reapplied for a permit to maintenance dredge the Channel to a dimension of 290 feet long and 30 feet wide, and to a depth of minus 4.0 feet below mean low water nearshore to minus 6 feet below mean low water at the waterward end. The proposal to construct an extension of the NE Jetty was deleted. The permit was issued, and a severance fee for the dredged material was paid based on a projected 700 cubic yards of material removed. The permit drawings and photographs depict the existing NE Jetty, the nearshore Channel boundary, and the general outline of the Mid- bulkhead. By 1981, aerial photographs demonstrate that the maintenance dredging of the Channel was complete, the NE Jetty was in place and functioning to protect the shoreline as evidenced by the accretional fillet, and the Mid-bulkhead had assumed its approximate current shape and configuration. Although the Channel has varied in depth over the years since the maintenance dredging and Hurricane Wilma, the greater weight of the evidence, including photographic evidence, indicates that the Channel was well-defined and remained navigable during that period. The Channel is an open-water exposed channel. Water in the Channel mixes due to direct tidal flow and the sheet flow of water due to shear wind stress. As water passes over the Channel, it sets up gyre, which is a mixing process. The open- water exposed Channel is subject to a high degree of mixing, even on normal waveless conditions, because of the wind transport of water and the tidal transport of water. The Channel is not a semi-enclosed basin. A semi- enclosed basin does not receive the direct forcing functions that an open-water channel receives. A semi-enclosed basin has no direct connection to open waters, but is connected to open waters by a narrower opening. Although a semi-enclosed basin exchanges water via every tidal cycle, the flushing process is one of slow mixing, in which a little bit of water is added to and withdrawn from the larger basin through the narrow opening during each tidal cycle. In such a case, a flushing analysis may be necessary to determine how much time and how many tidal cycles it may take to effect a complete exchange of the water in the semi-enclosed basin, and thus, for example, to dilute a pollutant to an acceptable level. A flushing analysis is not needed in this case because the Channel is an open-water, openly-exposed location subject to a high degree of mixing under normal day-to-day tidal processes. There is no greater basin connected by a restricting connection as with a semi-enclosed basin. Rather, the Channel has direct exposure to the tides, along with wind shear stress moving the water. The evidence in this case is substantial and persuasive, because the Channel is highly exposed to the open water and the tides, and a well-mixed and well-flushed aquatic system, that a flushing analysis is neither required nor necessary. Dock The dock made its first obvious appearance in 1981. It appears in a consistent shape and appearance through 2011. Aerial photographs taken in 2012, after the maintenance dredging of the Channel was conducted, show the dock had been removed. At the time of the hearing, the Applicants had installed new pilings and vent boards for the replacement dock, but the decking had not been installed. Work to complete the replacement of the dock was halted due to the pendency of the litigation challenging the structures. The proposed dock is less than 500 square feet. It is proposed for non-commercial, recreational activities. It is the sole dock proposed on the Property. The proposed dock will not impede the flow of water or create a navigational hazard. Boat Ramp Since the issuance of the 2008 approval, the boat ramp site was graded and stabilized in limerock material. The concrete ramp was not completed due to the pendency of the litigation challenging the structures. However, Applicants propose to pave the ramp with concrete. Based on Mr. Clark’s observations during his site visits, the boat ramp is landward of the mean high waterline depicted on the survey. The preponderance of the evidence demonstrates that the proposed boat ramp will provide access to the Channel, which provides a minimum navigational access of two feet below mean low water to the ramp. Applicants have agreed to install depth indicators at the ramp to identify the controlling depths of the navigational access. The work on the ramp involves no seagrass beds or coral communities. The ramp as proposed will require no more than 100 cubic yards of dredging. The total width of the ramp is to be 20 feet and the ramp surface will be no wider than 12 feet. Beach Area The area between the SW Jetty and the Mid-bulkhead is an accreted beach-type area that has been confined and protected by the Mid-bulkhead and the SW Jetty. The shoreline landward of the mean high water line, from the dry beach and to the upland, is somewhat steeper than adjacent unprotected shorelines, which is indicative of the grooming of the upper beach sediment and the stability of the shoreline between the Mid-bulkhead and the SW Jetty. As a result of the Hurricane Wilma storm surge, a substantial amount of sediment was swept across the Property and into the Atlantic waters. The beach area was inundated with sand and sediment from the overwash, which appears to have moved the shoreline well waterward of its previous position. Along the northern side of the SW Jetty, a substantial channelized gully was created. The configuration of the shoreline post-Wilma suggests that efforts were made by the then-owner of the Property to fill in the gully on the northern side of the SW Jetty, and to groom and restore the shoreline by redistributing sand and sediment on the Property. It is typical, and allowable under DEP emergency final orders, for affected property owners to redistribute overwashed deposits and place them back within the beach system. In that regard, the DEP encourages the redistribution of clean beach sand back onto the beach. The then-owners of the Property were not alone in taking steps to address the effects of Hurricane Wilma on their adjacent shorelines. The photographic evidence demonstrates that Petitioners engaged in similar restorative activities, which included bringing in material purchased from a contractor to fill in a gully created on their property by the overwash. Observation of representative soil samples from the beach area demonstrate that the soils are consistent with those in the upper beach areas found throughout the area. The only areas of inconsistent soils were found in the interior of the rock structure of the Mid-bulkhead, which contained a four to six-inch layer of soil with a different consistency and darker brown color, and small area of similar soil directly adjacent thereto and well above the mean high water line. The greater weight of the competent, substantial, and credible evidence demonstrates that there was no substantial amount of “fill” from off-site placed on or adjacent to the beach area. Rather, the nature, appearance, and composition of the soils suggests that the temporary increase in the size of the beach area after Hurricane Wilma was the result of grooming and redistribution of sand and sediment pushed onto the Property and into the nearshore waters by the Hurricane Wilma storm surge. In the years since Hurricane Wilma, the influence of normal tidal and weather-driven events has returned the beach area between the mid-bulkhead and the SW jetty to roughly the configuration that existed prior to the passage of Wilma, though it remains somewhat waterward of its pre-Wilma location.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law set forth herein it is RECOMMENDED that the Department of Environmental Protection enter a final order approving the February 20, 2013, proposed Permit, as conditioned by Applicants’ December 12, 2013, Proposed Changes to the Pending Agency Action. DONE AND ENTERED this 25th day of July, 2014, in Tallahassee, Leon County, Florida. S E. GARY EARLY Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 25th day of July, 2014.

Florida Laws (15) 120.52120.565120.569120.57120.595120.68253.141267.061373.406373.4131373.414373.421379.2431403.81357.105 Florida Administrative Code (7) 18-21.00318-21.00418-21.00518-21.005128-106.10462-110.10662-330.417
# 9
COLEMAN & ASSOCIATES, INC. vs. DEPARTMENT OF ENVIRONMENTAL REGULATION, 83-001764 (1983)
Division of Administrative Hearings, Florida Number: 83-001764 Latest Update: Feb. 26, 1985

The Issue The issues to he determined in this matter concern the question of whether it is necessary for the Petitioner to obtain a dredge and fill permit from the Respondent prior to the construction of a road. Should it be found that the Respondent has jurisdiction to require a permit prior to such construction, the related question of the Petitioner's entitlement to a dredge and fill permit as envisioned by Chapter 403, Florida Statutes, and Chapter 17, Florida Administrative Code, must also be resolved.

Findings Of Fact The property which is the subject of this dispute is located in Clay County, Florida, south of the city of Orange Park, Florida, adjacent to Blanding Boulevard which is also known as State Road 21. The project at issue contemplates the relocation of a portion of a road known as Hear Run Boulevard, which presently intersects with Blanding Boulevard. The present configuration of Hear Run Boulevard serves a building housing the Clay County Courthouse Annex, which has also been referred to as a tag agency building, and a subdivision known as Bear Run Subdivision. If the alternate road were constructed it would serve the same purpose in terms of utility. That construction would involve the placement of fill material in a cleared area over which Respondent asserts permit jurisdiction under Chapter 403, Florida Statutes and Chapter 17-4, Florida Administrative Code. Petitioner does not believe that Respondent has jurisdiction to require a permit; however, if the permit is needed, Petitioner believes that it is entitled to the grant of a permit. As presently envisioned, it would be necessary to place approximately .48 acres of fill to construct the road. The relative location of the present Bear Run Boulevard, Blanding Boulevard, and the relocated Dear Run Boulevard are depicted in Petitioner's exhibit number 3, admitted into evidence. Petitioner had cleared the site of the proposed realignment of Bear Run Boulevard, prior to the fall of 1981. As a consequence, determination of the jurisdictional limits of the Department of Environmental Regulation, by the use of indicator species set forth in Rule 17-4.02, Florida Administrative Code, in establishing' the upland reach of waters of the state for permitting purposes was made more difficult than normal. Nonetheless, in September, 1981, as modified in November, 1981, Timothy Deuerling, Respondent's employee, in conjunction with Thad Hart of the United States Department of the Army, Corps of Engineers, examined parcels of land adjacent to the site in question, which parcels are roughly to the east and west of the area in question and having identified plants found within the indicator species list of Rule 17-4.02, Florida Administrative Code, in sufficient numbers, established the jurisdictional limits of the Respondent's permit authority immediately below the present location of Bear Run Boulevard. In September, 1981, the swamp area south of the cleared property had been seen by Deuerling to be characterized by bald cypress, ash, blackgum and titi . In effect, an imaginary line was drawn between the wetland species on the adjacent sides of the site through the Petitioner's property with that portion of the site found roughly to the south of the imaginary line being considered within the waters of the state and property roughly to the north of the line being regarded as uplands and beyond the jurisdiction of the state. The initial determination of September, 1981, had been adjusted in November, 1981, moving the jurisdictional line further towards the receiving body of water which is known as Little Black Creek, a Class III water body. (Cyrilla racemil- flora) Two weeks before the hearing date in this cause, a project site inspection was made by Jeremy Guy Anthony Tyler, an employee wish the Department of Environmental Regulation. Tyler is the holder of a bachelor of science degree in mathematics, geology and physical geology and a masters degree in oceanography. His course study included chemistry and biology. He observed colonial upland species such as dog fennel and broom sage, together with some wetland species such as cypress seedlings, ash seedlings, button brush, cattails, willows, and Sagittaria, also known as arrowhead. Tyler indicated that the cattails and willows found on the site are typical invading wetland- type species. As Tyler described cattails and willows are plants that are seen at the start of a cycle of wet land development and would be expected to disappear as wetland species of trees became established. The wetland species were considerable in number. Dr. A Quentin White, Jr., Ph.D. in biology, gave testimony in behalf of the Petitioner and established that following clearing of the site, certain invader or colonial type species such as Phragmites and tipon, wetland species envisioned by the jurisdictional indicator list appeared. These colonial or invader species, as described by Dr. White, are probably located on the site in the positions observed because of off-site runoff into the site. Dr. White observed some cypress seedlings at the edge of the clearing adjacent to "'hat he describes as a swamp area, moving in the direction of Little Black Creek. These observations took place the day before the commencement of the hearing. White was uncertain of the jurisdictional limits of the Department of Environmental Regulation, expressing the opinion that the limit as established by the plant indices fell somewhere within the cleared area, which is the subject of this dispute, but did not extend as far as the current location of Hear Run Boulevard, based upon his perception of dominant vegetational species. Having considered the testimony and non-testimonial evidence, the facts demonstrate that the site of the proposed relocation of Bear Run Boulevard is within the dredge and fill permitting jurisdiction of the Department of Environmental Regulation. Respondents exhibit 8 is an aerial photograph depicting the site prior to the clearing. Respondent's exhibit 7 depicts the site following the clearing. A comparison of these two aerial photographs supports the determination that the relocation of Bear Run Boulevard falls within the permitting jurisdiction of the Department of Environmental Regulation as established by plant indicators. This is further borne out by the testimony of the witness Tyler in describing the vegetational signature found on Respondent's exhibit 8. 1/ Mr. Coleman was present when the September, 1981, initial jurisdictional line and the refinement of that choice which moved the line in the direction of Little Black Creek, in November, 1981, were physically established. Coleman was instructed that any activity below that line in the direction of Black Creek would require permitting. Nonetheless, fill material was placed in the cleared area to include chunks of asphalt. This led to the entry of the cease and desist order of February 22, 1982, on the part of the United States Department of the Army, Corps of Engineers, a copy of which may be found as Respondent's exhibit number 3 admitted into evidence. That material was subsequently removed and its removal was acknowledged in correspondence from the Corps of Engineers to Ralph Coleman dated October 5, 1982. A copy of that correspondence may be found as Respondent's exhibit number 4 admitted into evidence. Having constructed the present Bear Run Boulevard as it intersects with State Road 21, Coleman and Associates, Inc., determined to relocate the road and made application to the Department of Environmental Regulation for the issuance of a dredge and fill permit. A copy of that application may be found as Petitioner's exhibit number 4 admitted into evidence. The date of the application was December 22, 1982. The purpose of the relocation was to build a connection to State Road 21 which did not have as severe a curve as the 30 degree curve in the present configuration of Bear Run Boulevard. This initial application sought permission to fill an area of approximately .73 acres, and contemplated the placement of fill between the existing location of Bear Run Boulevard as it intersects with State Road 21 and the area where the road was to be relocated. The area of fill may be seen in crosshatch in a planview drawing, a copy of which is found as Petitioner's exhibit number 2, admitted into evidence. This request for relocation of Bear Run Boulevard was supported by John W. Bowles, Public Works Director, Clay County, Florida, as evidenced by correspondence to that effect, addressed to Ralph Coleman on December 28, 1982, a copy of which Petitioner's exhibit number 8 admitted into evidence. Following discussion with G.E. Carter, an employee of the Department of Environmental Regulation, the Petitioner, in the person of Ralph R. Coleman as president, offered revision to the application for the placement of fill as seen in the February 22, 1953, correspondence to that effect, a copy of which is Respondent's exhibit number 2 admitted into evidence. That exhibit erroneously depicts the amount of fill as being 3300 yards. As previously described, the fill was approximately .48 acres. In essence, the new project would only promote fill material in the area of the new roadway or relocated road. It does not contemplate the placement of fill between the new road and the existing Bear Run Boulevard. This amendment to the application is graphically depicted, in terms of the fill placement, through the drawing which is Petitioner's exhibit number 3 admitted into evidence. The crosshatch shows the fill material to be placed. This amendment also modified the project to the extent that a widening of Blending Boulevard by efforts of the State of Florida, Department of Transportation, caused the placement of fill in an area of the proposed relocation of Bear Run Boulevard, which was not the case in the initial application for permit of December 22, 1982. This circumstance is shown in Petitioner's exhibit number 3 and is otherwise described in the testimony of the witnesses. "what has occurred is that the Department of Transportation has filled an area of the proposed relocated road and the .48 acres constitutes the balance of the necessary fill. On February 25, 1983, G. F. Carter, as Environmental Specialist with the Department of Environmental Regulation, had written to Coleman and Associates, Inc., suggesting that the project, as proposed, and that is taken to mean the project as proposed on December 22, 1992, would have an adverse impact on the environment. The correspondence goes on to state that modification suggested by Carter could lessen the impact to the extent of possibly eliminating any justifiable reason for denying the permit. A copy of that correspondence may be found as Petitioner's exhibit number 9 admitted into evidence. It is unclear exactly what Carter meant by this statement of how Petitioner could achieve permission to install the relocated road. However, it is evident that Coleman felt that the revisions of February 22, 1903, constituted the pursuit of changes which would lead to the issuance of a permit for dredge and fill. Whatever Carter's intentions, he could not bind the agency head of the Department of Environmental Regulation in the ultimate determination to grant or deny the permit as applied for in the revised plan of February 22, 1983. Ultimately, Respondent denied Petitioner's revised application for a dredge and fill permit based upon the belief that to grant permission to place fill materials as contemplated by the project, would cause a degradation of the water quality of state waters as envisioned by Chapter 403, Florida Statutes, and Rule 17-3, Florida Administrative Code. This led to the present formal Section 120.57(1), Florida Statutes hearing as requested by the Petitioner. In the present circumstance in the cleared area where the relocated road would be built, a large amount of stormwater runoff is occurring, primarily from road surfaces and the parking lot adjacent to the Clay County Courthouse Annex. The road surfaces are constituted of the present Bear Run Boulevard and State Road 21. Within this runoff is a large quantity of sediment and some oil and gas and other debris that falls on the road surface. Part of that debris is in a dissolved state. This surface runoff is receiving very little pollution treatment in its passage over the area cleared by the Petitioner. Dr. White gave the opinion that should Bear Run Boulevard be relocated, a retention area would be created within the boundaries of the present Bear Run Boulevard, the relocation of Bear Run Boulevard and State Road 21, thus improving water quality by retaining some of the runoff for a short period of time within that triangular shaped retention area. At present Dr. White finds water quality degradation which is more pronounced than would be the case if Dear Run Boulevard was relocated and the retention area created as described. White contemplates a circumstance, in which, with the relocation of Bear Run Boulevard swales and grassy areas could be designed to retain much of the sediment and act as a filter in treating water coming off State Road 21 through a culvert before entering the well vegetated wetlands area adjacent to the clearing, as one moves in the direction of Little Black Creek. White believes that this sediment which is being discharged through the transport system will eventually creep over into the stand of wetland trees and smother those trees along the fringe of the more well vegetated area at the southern edge of the clearing. The swales and grassy areas are as distinguished from the retention area within the triangular shape piece of land to be boardered by the present road surfaces and the relocated Bear Run Boulevard. Dr. White found that the cleared area exchanges waters with Little Black Creek in the sense of a flow in the direction of Little Black Creek from the proposed project site, notwithstanding a finger of land which is higher in elevation between the site and Little Black Creek as may be seen in Petitioner's composite exhibit number 11, a topographical survey map depicting various elevations in the vicinity of the project. Dr. White noted the very eroded condition of the project site, especially in the area of discharge from State Road 21, on the southern end of the cleared area. The by-product of this erosion, as seen by Dr. White, is the movement of sediment into waters of the state having a detrimental effect on water quality, primarily through increased turbidity. With increased turbidity productivity of the plants species is reduced. In addition, animals which live in the water are adversely affected. This problem with erosion may also cause submerged aquatic vegetation to be covered over and disrupt the nesting habitats of animal species. Dr. White concedes that the placement of fill material, such as would be the circumstance with the construction of the relocated Bear Run Boulevard, in that immediate zone, would kill the wetlands species, thereby removing them as a source of filtration of pollutants in the effort to maintain water quality. Dr. White believes that with the continuation of heavy rains in storm events, the wetland vegetation which is native to the cleared area might be washed out. On the other hand, if the area was allowed to recover, and a reduction of water flow were to occur, removing the destructive quality of that flow, he would expect the reoccurrence of sweetgum, cypress, water tupolo, and other species which are found in hardwood swamp areas. (wetlands) Although Dr. White was struck by the amount of erosion and sedimentation associated with runoff through control devices for and on the road surface of State Road 21, at the southern end of the cleared area, he could not quantify what percentage of the problem of erosion was attributable to the State Road 21 circumstance, the parking lot of the Clay County Courthouse Annex and the existing Bear Run Boulevard. Dr. White believes that upland retention basin would be preferable to retention in the cleared area, but upland property is not within the ownership and control of the Petitioner for such purpose. Dr. White has the opinion that Little Black Creek would only flood the cleared area in question in times of extremely high water. The observations by Dr. White are accepted as accurate. George Register, III, consultant to the Petitioner, has observed the site and gave his testimony. Register is the holder of a bachelors degree in biology and a masters degree in coastal and oceanographic engineering. He noted two flumes which discharge water from the Bear Run Boulevard, in times of storm events, going directly into the cleared area. He feels that a retention area on site can offer water treatment for the rainfall which is directly on the property and flowing through the property. Register also observed the situation related to State Road 21, particularly the road drainage system associated with the widening of State Road 21 from a two-lane to a four-lane road. Register would expand the idea of Dr. White concerning swales and grassing on the site to deal with the discharge from State Road 21, because he does not feel that the problem associated with the discharge can be completely alleviated on the site. He would use the more vegetated wetland area south of the cleared area to treat the runoff from State Road 21, by the settling of suspended particles in the runoff and the slowing down of the flow through the vegetated area using dikes and weirs and other control structures before the final discharge into Little Black Creek. (All of the activities associated with State Road 21, as to construction and drainage, are the responsibility of the State of Florida, Department of Transportation.) Register, as did White, noted that the present circumstance, given the amount of water being discharged onto the site, is not one which affords meaningful water treatment on the site. Register also observed the mix of wetlands and upland vegetation in the cleared area. He noted that exchange of water in the direction from Little Black Creek to the cleared area would only occur in times of extreme flooding, which has not occurred during the years in which he has had knowledge of this site. Register was not able to attribute the amount of runoff associated with the Clay County Courthouse Annex, Bear Run Boulevard, and State Road 21, in terms of percentages of contribution in a rainfall event, but was impressed by the volume from State Road 21. He does not find the present sparse wetlands vegetation, the colonial or volunteer species found at the site, to be of much value in water treatment. In order to afford meaningful treatment, Register thinks that the stand must be very healthy and diverse, as would commonly occur on the site, before it may offer a meaningful assistance in stormwater treatment. To improve the situation on the site, he would create the retention area with berming and weirs and other control structures and plant select kinds of vegetation to help in water treatment. Given the present circumstance, he would expect that in the area of the State Road 21 discharge pipe some form of wetlands vegetation such as cattails or pickleweed would persist as a "little band" of material. The rest of the area he expects to come back predominately as upland vegetation given the current trend, particularly as eroded material continues to be deposited on the site. The use of erosion control mats and the planting of certain types of vegetation to slow dawn the erosion, would not be sufficient to reverse the trend of the introduction of upland vegetation in the cleared area. Register's observations are accepted as accurate. The detail envisioned in the construction of the retention area, the Placement of swales and grassing, as described by White and Register, cannot be found in the original or amended application of the Petitioner. Nonetheless, Petitioner expressed a willingness to employ those techniques suggested by his consultants, Register and White, if given permission to construct the relocated Bear Run Boulevard. Petitioner's exhibits 18, 19, 20, 23, and 24, which are photographs admitted into evidence, depicts the impact of the expansion of State Road 21, in terms of sedimentation and erosion on site and in the more well vegetated wetlands area south of the site or cleared area. Some of those photographs show the types of vegetation as described by the various witnesses who gave testimony. The photograph attached to Petitioner's exhibit number 10 shows standing water in the cleared area, which is a frequent occurrence. The soil in the cleared area has remained wet following the clearing. The witness Tyler, who is a supervisor of the dredge and fill section of the northeast district office of the Department of Environmental Regulation, gave his impressions of the project. Tyler looks upon the creation of the area between existing Bear Run Boulevard, the proposed Dear Run Boulevard, and State Route 21 as an act of taking that area constituted of a triangular shaped piece of land out of the system in terms of water quality maintenance. He does not perceive this modification of the original application to exclude the placement of fill within that triangular shaped parcel as being an improvement to the original design. He overlooks the value of retention of water within the parcel as having a role in terms of water treatment and protection of the more dense wetlands area south of the site and Little Black Creek and the relatively ineffectual situation that now exists in the way of water treatment. That southerly dense area has been seen by Tyler to contain a number of cypress, tupelo, sweetgum and maple trees. Tyler feels that the effect of the project would be to eliminate the cleansing effect of the treatment on-site on the occasions where Little Black Creek overflows it is banks in the direction of the proposed construction site. This, as established through the testimony of White and Register, is an infrequent event. In summary, Tyler overlooked the potential of change, especially with attendant features which could be placed in the triangular shaped retention area and the contribution of placement of swales and grassing add. Although this causes detrimental impact on the site, changes would tend to improve water quality in the more pristine area south of the site, by tending to improve the filtering capacity of the clear area, which at present has little value in that role. Timothy Deuerling is an Environmental Specialist with the Department of Environmental Regulation. He holds a bachelors degree in Science and has taken course work in biology, zoology, and botany. In his visits to the site in the cleared area Duereling has observed cattails, brushes, willows, cypress and ash. He believes that the relocation of Bear Run Boulevard would adversely affect the water quality of Little Black Creek in the instance of placement of a fill in a wetland area, thus eliminating vegetation and soil which could filter and dissimulate pollutants and nutrients in the water. He feels that on the occasion of a reverse flow of water, from the creek to the site, as opposed to the site to the creek, placement of a roadbed would tend to take away the ability of that vegetation which has been covered over by the roadbed to remove pollutants and excess nutrients from the waters of Little Black Creek. By such action of building the road, he feels that the cumulative impact is to cause a violation of water quality, in that at some point in time the accumulation of projects will be such that the system will go out of balance and stay out of balance in terms of water quality. Deuerling believes that the general area of the project is a prime location for such projects. Even though Deuerling concedes that a retention area on site would clean up the water, he does not feel that is an acceptable alternative, given the fact that this area of retention is within the landward extent of Little Black Creek. The effect of the placement of retention area on site is to pollute waters which are already those which are the responsibility of the state, according to Deuerling. Deuerling would vie for upland retention. Deuerling's opinions are not accepted, given the fact that the present site offers little or no filtering capacity. The construction of the relocated Bear Run Boulevard with attendant features envisioned by Dr. White and Mr. Register would improve the filtering capacity, and enhance the overall system at the expense of an element of the system which, at present, offers little or no benefit and whose prospects are not such that those beneficial features will improve in the future if left in the present state. Uplands are not available for the placement of retention areas, and that suggestion, while more desirable, is not viable in this circumstance. Finally, while cumulative impact, as associated with intentional discharge into waters of the state, is a matter for consideration, the present case is not one which presents that form of discharge. The State of Florida, Department of Transportation, in widening State Road 21 from a two lane to a four lane road, in the vicinity of the Petitioner's project, placed approximately ten acres of fill in the landward extent of waters of the state. This was in furtherance of the application for a dredge and fill permit filed with the Respondent, a copy of that application being found as' Petitioner's exhibit number 5. A Copy of the permit may be found as Petitioner's exhibit number 6 admitted into evidence, dating from April 29, 1983. The Department of Transportation was also allowed to remove 1778 cubic yards of fill material. The permit set forth general and specific conditions to include revegetation, turbidity control, turbidity monitoring, erosion control, immediate stabilization of filled areas, and efforts at minimizing the wetlands disruption. In carrying out its function, approximately .096 acres of land which was contemplated for filling in the original Coleman application was filled by the Department of Transportation. No filling was done by the Department of Transportation in the area contemplated by the revised application offered by the Petitioner. The Department of Transportation did fill an area which intersects with State Road 21 and will serve as part of the roadbed for the relocated Bear Run Boulevard. The cleared area, and specifically the site where the fill material would be placed in the construction and relocation of Bear Run Boulevard, is within Class III waters of the state, as described in Chapter 17-3, Florida Administrative Code and subject to water quality standards pertaining to that classification. With the advent of this construction, given the limited value of the filtering capacity of the present site and the changes that can be promoted by the replacement of a retention area and associated features, while it might be expected to influence water quality standards at issue within the area of the placement of the fill material and within the retention basin, it would promote an improvement in the condition of the water quality in the flood plain which is immediately south of the cleared site and ultimately improve the condition of Little Black Creek. This finding relates to those water quality standards dealing with biochemical oxygen demand, nutrients, turbidity, biological integrity, and dissolved oxygen. The State of Florida, Department of Natural Resources, has granted authority to pursue the project as envisioned by Section 253.77, Florida Statutes, and confirmed by correspondence of Henry Dean, Interim Director, Division of Land Sales, dated January 28, 1983. A copy of this confirmation may be found as Petitioner's exhibit number 7 admitted into evidence. The United States Department of the Interior, Fish and Wildlife Service, and United States Environmental Protection Agency made known their comments on the project through correspondence, copies of which may be found as Respondent's composite exhibit number 9 admitted into evidence.

Florida Laws (4) 120.57253.77403.087403.088
# 10

Can't find what you're looking for?

Post a free question on our public forum.
Ask a Question
Search for lawyers by practice areas.
Find a Lawyer