Findings Of Fact Petitioner, J. D. Pirrotta Company (JDP), is a general contracting company located in Orlando, Florida. JDP has bid on projects involving construction of schools or educational facilities, including projects for Valencia Community College. Respondent, District Board of Trustees of Valencia Community College, is the governing body of the community college, with the authority to award contracts. Valencia Community College (VCC), in Bid #90/91-06, advertised for sealed bids for interior remodeling and renovation of existing buildings' modules 3 and 5, on its west campus on South Kirkman Road, in Orlando, Florida. The sealed bids were due at or before 2:30 p.m., on December 13, 1990, in the purchasing department of VCC, 190 South Orlando Avenue, Suite 402B, Orlando, Florida 32801. The Invitation to Bid includes a voluminous project manual containing instructions to bidders, various forms, a standard contract text and detailed specifications. A separate bid packet contains the set of drawings for the construction work. The advertisement of the Invitation to Bid, and Section 00100 of the Project Manual, Instructions to Bidders, paragraph 14A, reserve for the owner the right to reject any or all bids and to waive any and all "informalities". (Respondent's Exhibits #1 and #2) Section 00100, Instructions to Bidders, paragraph 18, provides: 18. SUBCONTRACTORS, ETC. The bidders at bid date shall submit to Owner a list of all subcontractors and other persons and organizations (including those who are to furnish the principal items of material and equipment) proposed for those portions of the work as to which such identification is so required. Such list shall be accompanied by an experience statement with pertinent information as to similar projects and other evidence of qualifications for each such subcontractor, person and organization if requested by Owner. If Owner, after due investigation has reasonable objection of any proposed subcontractor, other person or organization either may, before giving the Notice of Award, request the apparent successful bidder to submit an acceptable substitute without an increase in bid price. If the apparent successful bidder declines to make any such substitution, the contract shall not be awarded to such bidder, but his declining to make any such substitution will not constitute grounds for sacrificing his bid security. A subcontractor, other person or organization so listed and to whom Owner does not make written objection prior to the giving of the Notice of Award, will deemed acceptable to Owner. Should the subcontractors list be revised, for any reason, architect and Owner shall be immediately notified. (Respondent's Exhibit #2) Paragraph 9, Section 00300, the bid form, provides: The following documents are attached to and made a condition of the Bid: Required Bid Security in the form of a Bid Bond. A tabulation of subcontractors and other persons and organizations required to be identified in this Bid. Required Bidders Qualification Statement with supporting data. (Respondent's Exhibit #2) Section 00700, the Public Entity Crimes statement form, includes these instructions: Any person responding with an offer to this invitation must execute the enclosed Form PUR 7068, SWORN STATEMENT UNDER SECTION 287.133(3) (a), FLORIDA STATUTES, ON PUBLIC ENTITY CRIMES and enclose it with your bid. If you are submitting a bid on behalf of dealers or suppliers who will ship and receive payment from the resulting contract, it is your responsibility to see that copy/copies of the form are executed by them and are included with your bid. Failure to comply with this condition shall result in rejection of your bid. (Respondent's Exhibit #2) The Instructions to Bidders and the drawings include a total of ten deductive alternatives to be addressed in the bids, to afford VCC some flexibility in the event the base bid might be higher than the agency's available funds. In response to the advertisement and request for sealed bids, VCC received bids from the following seven contractors: Seacoast Constructors and Consultants; JDP; Southland Construction, Inc.; Harbco, Inc.; Technical Design Systems, Inc.; Hembree Construction, Inc.; and Waltree Construction, Inc. The bids were opened publicly and read aloud beginning shortly after the submittal deadline on December 13, 1990. Jack C. Crawford, Vice-President for Administrative Services, and Stephen Richard Childress, Purchasing Manager, participated in the bid opening on behalf of VCC. Seacoast Constructors was the lowest bidder, at $1,274,000.00, base bid; JDP was the second lowest bidder, at $1,297,000.00, base bid. None of the bidders submitted bids containing all of the requested or required information. None of the bidders included a deduct alternative requested by Drawing E-10, General Notes number 2. Only JDP included the deduct alternative requested by Drawing E-6, General Notes number 2. Seacoast Constructors and Consultants failed to include Form PUR 7068, Public Entity Crimes statement, with their bid, but it executed and submitted the form to VCC on December 13th, the date of the opening. Two of the bidders, JDP and Harbco, failed to submit subcontractor lists with their bids. At the time of hearing, JDP had still not submitted its list. For this project the low base bid is within VCC's available funds, and it does not intend to rely on any of the deduct alternatives in the bids. Following the bid opening, the bid tabulation form was posted on a bulletin board in the administration building. A copy of the tabulation form was also placed in a folder which includes recommendations on other bids and which is maintained at the desk of the security guard outside the room where the bids are opened. Inside the front cover of the folder, in the bottom left hand corner, is a small typewritten statement: Failure to file a protest within the time described in S. 120.53(5), Florida Statutes, shall constitute a waiver of proceedings under Chapter 120, Florida Statutes. There is no evidence of any other notice of section 120.53, F.S. remedies to bidders, including in the advertisement or in instructions to bidders. JDP filed a written bid protest in a letter dated December 13, 1990 and received on December 14, 1990. The letter clearly states that it is a formal protest, pursuant to Section 120.53(5), F.S. It argues that bids submitted by Seacoast Constructors and others were unresponsive and should be rejected for failure to include the Public Entity Crimes Statement, for failure to bid on a deduct alternative, and for other reasons (immaterial, because they apply to higher bidders). The protest letter requested award to JDP. JDP met with representatives of VCC to attempt to resolve the protest. At the meeting, Joseph Pirrotta was informed that his bid was considered nonresponsive because it failed to include a subcontractors' list. The meeting did not resolve the matter, and on December 19, 1990, Joseph Pirrotta sent a follow-up letter arguing that the text of the bid instructions only require a subcontractors' list for "...portions of the work as to which such identification is so required", and nowhere in the bid packet was any reference to which were required. JDP considered that the subcontractors' list was, therefore, unnecessary. The December 19th letter also reiterated JDP's request to reject the other bids and to award the contract to JDP. The December 13th and 19th letters are the only written protests by JDP. VCC has previously awarded contracts to bidders who failed to submit a Public Entity Crimes Statement with their bid. It considers such failure an "informality" subject to waiver. It considers failure to submit a list of subcontractors an economic advantage with respect to other bidders. Representatives of VCC have recommended to its board that the contract be awarded to Seacoast Constructors, the lowest bidder.
Recommendation Based on the foregoing, it is hereby, RECOMMENDED That the District Board of Trustees of Valencia Community College enter its final order awarding the contract in Bid #90/91-06 to Seacoast Constructors and Consultant, and rejecting the protest of J.D. Pirrotta Company. DONE AND RECOMMENDED this 25th day of February, 1991, in Tallahassee, Leon County, Florida. MARY CLARK Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904)488-9675 Filed with the Clerk of the Division of Administrative Hearings this 25th day of February, 1991. COPIES FURNISHED: Leslie King O'Neal, Esquire P.O. Drawer 1991 Orlando, FL 32802 Jeffrey S. Craigmile, Esquire Brian P. Kirwan, Esquire 390 N. Orange Ave., Ste. 2180 Orlando, FL 32801 Jack C. Crawford Vice President Administrative Services Valencia Community College P.O. Box 3028 Orlando, FL 32802
Findings Of Fact On or about June 3, 1987, DOT advertised that it would receive bids on State Project No. 97870-334, etc. in Dade, Broward and Palm Beach Counties to improve portions of the Florida Turnpike. On June 24, 1987, bids were received by DOT from Gilbert, State Paving and Archer Western Contractors. The apparent low bidder at bid opening on June 24, 1987, was Gilbert and State Paving was apparent second low bidder. DOT was informally advised by John Beck, an attorney representing State Paving, that Gilbert's bid was believed to be unbalanced and the appropriate officials referred the issue to the DOT Bureau of Estimates to look into the low bid to see if it was unbalanced to the detriment of the State. Review of the Gilbert bid began with an internal analysis of the bid prices in comparison to the DOT Estimate of the Work. All bid prices above or below a certain percent of the engineer's estimate of costs were prepared in a computer printout and those items were checked by the consultants on the project. Basically, the major items in the project, which comprises some 400 bid items, were broken down to 10 groupings and the bids for each item in these groups was prepared for the three bidders and tabulated in Exhibit 2. The DOT Technical Committee reviewed the bids and concluded there was no unbalancing in Gilbert's bid which was detrimental to the State. This recommendation was approved by the Awards Committee which had also been furnished the information in Exhibit 2 by the consulting engineer for the project. Based upon this information, the Awards Committee concluded that the awards should go to Gilbert as no unbalancing detrimental to the State was found. Specification made a part of all DOT bid proposals provide that DOT may reject an unbalanced bid. As a matter of policy, DOT only rejects unbalanced bids deemed contrary to the interests of the State. Bids may be unbalanced in numerous ways. One significant method is known as front loading where the bidder submits a high bid for the work to be done at the beginning of the project such as clearing and grubbing and low bids for the work done later in the project. If successful in getting the award, this bidder would have excess profits on the clearing and grubbing which could draw interest while the less profitable later work was being done. Another variant is to study the plans and specifications to see if the quantities listed in the bid proposal are accurately reflected in the plans and specifications. If not, those items for which the bid proposal shows more than the plans and specifications reasonably required can be bid low, and for those items by which the bid proposal shows less than actually will be required can be bid high. Since the contractor is paid by the units used, those excess units at a higher price would result in more profit for the contractor yet allow him to submit an overall lower bid. For example, if the bid proposal contains two similar items for which the request for proposal estimates 100 each will be required, and the bidder concludes that only 50 will be required at Site A and 150 at Site B, he submits a low bid for Site A and a high bid for Site B. If the fair price for these units is $10 each, and the bidder bids $5 per unit for Site A or $500, and $15 for Site B or $1500, the total bid price is $2000, but if the bidder only installs 50 at Site A he would be paid $250 and install $150 at Site B for which he would be paid $2250. His total compensation would be $2500. In competitively bid contracts, such as the instant project, contractors modify their prices by taking a calculated risk that certain items bid on will not need to be accomplished and submit a nominal bid of $1 or 1 cent for such an item. By definition, such a bid is unbalanced, but if the item so bid has to be provided, the contractor has to provide this service at the bid price. The only evidence submitted by Petitioner tending to show Gilbert's bid was unbalanced to the detriment of the State was testimony, objected to and sustained, that the plans and specifications showed more of certain units would be needed than the estimated quantities on the bid proposal, which constituted the basis for the bids submitted. Such evidence constitutes a challenge to the bid specifications and is untimely. Gilbert's witness who prepared the bid submitted by Gilbert adequately explained the basis for bids submitted by Gilbert on the challenged items. The document entitled "This is Not an Addendum," clearly states on its face that "an addendum may follow containing the following information." No bids are solicited thereby and for no item contained thereon is the State obligated to contract. This document was provided all bidders before bids were open and no unfair advantage to anyone or detriment to the State was shown. In a project containing some 400 bid items, many modifications of the contract during construction is required to cover unforeseen circumstances that arise. While it would be better to get competitive bids on every bit of work done on this project, in this imperfect world unforeseen items will appear. The document complained of attempts to alert the bidders to some anticipated work not foreseen when the bid proposal was prepared, but it is not a part of the bid solicitation.
The Issue The issue in this bid protest is whether Respondent acted arbitrarily when it decided to reject all of the bids it had received in response to a solicitation seeking bids on a contract for roof repairs.
Findings Of Fact On January 10, 2008, the Florida Department of Environmental Protection (the "Department" or "DEP") issued an Invitation to Bid (the "ITB"), the purpose of which was to solicit competitive bids from qualified contractors on a project whose scope of work envisioned repairs to the wind-damaged roofs of several buildings located on the grounds of the Hugh Taylor Birch State Park in Fort Lauderdale, Florida. Some of the buildings to be repaired were single-family residences. Work on these structures accordingly needed to conform to the requirements prescribed in the 2007 Manual of Hurricane Mitigation Retrofits for Existing Site-Built Single Family Residential Structures (the "Manual"), which the Florida Building Commission (the "Commission"), following an explicit legislative directive, see Section 553.844(3), Florida Statutes,1 recently had adopted, by incorporative reference, as a rule. See Fla. Admin. Code R. 9B-3.0475 (2007).2 The Rule had taken effect on November 14, 2007, giving the Manual's contents the same status and force as the Florida Building Code. Id. Just before the Department issued the ITB, the Commission had approved, at a meeting on January 8, 2008, a modified version of the Manual, which it called the 2007 Manual of Hurricane Mitigation Retrofits for Existing Site-Built Single Family Residential Structures, Version 2 (the "Revised Manual"). In consequence of the Commission's approval of the Revised Manual, the Florida Department of Community Affairs ("DCA") caused a Notice of Proposed Rule Development to be published on January 25, 2008, in the Florida Administrative Weekly. This official advertisement announced that the Commission intended to amend Rule 9B-3.0475, so that its incorporative reference would mention the Revision Manual instead of the Manual. See 34 Fla. Admin. W. 461-62 (Jan. 25, 2008).3 DCA caused a Notice of Proposed Rule respecting the intended revision of Rule 9B-3.0475 to be published on February 1, 2008, in the Florida Administrative Weekly. See 34 Fla. Admin. W. 605 (Feb. 1, 2008).4 On February 5, 2008, the Department issued Addendum No. 4 to the ITB (the "Addendum"). The Addendum provided in pertinent part as follows: Bidders shall bid the project as specified despite the recent change in Rule 9B-3.0475 relating to hurricane mitigation retrofits. Any additional water barrier will be accomplished by Change Order after award of the contract. (The foregoing provisions of the Addendum will be referred to hereinafter as the "Directive"). On February 12, 2008, the Department opened the bids it had received in response to the ITB. Ten (out of 12) of the bids submitted were deemed responsive. The bid of Petitioner Spinella Enterprises, Inc. ("Spinella") was one of the acceptable bids. On February 19, 2008, DEP posted notice of its intent to award a contract to the lowest bidder, namely Spinella, which had offered to perform the work for $94,150. The second lowest bidder was The Bookhardt Group ("Bookhardt"). Bookhardt timely protested the intended award, raising several objections, only one of which is relevant here. In its formal written protest, dated March 3, 2008, Bookhardt alleged that "[t]he new State of Florida law F.S. 553.844 was not part of the solicitation." On April 4, 2008, Rule 9B-3.0475, as amended to incorporate by reference the Revised Manual, took effect. See Fla. Admin. Code R. 9B-3.0475 (2008). On May 16, 2008, DEP posted notice of its intent to reject all bids received in response to the ITB. (Bookhardt's protest, which remained pending, had never been referred to DOAH for a formal hearing.) Spinella timely protested the Department's decision to reject all bids. In an email sent to Spinella on July 22, 2008, DEP's counsel explained the rationale behind the decision: The reason the Department rejected all bids follows. When the Department posted the notice of intent to award the contract to Spinella Enterprises, Inc., the second low bidder (Bookhardt Roofing) protested the intent to award. The second low bidder's basis for protesting the intended award was that Addendum 4 directed bidders to ignore certain rules of the Construction Industry Licensing Board [sic], which had become effective after the bid opening, which was not in accordance with the law. As a result, this may have caused confusion and the Department had no assurance that bidders were bidding the project correctly. In addition, the statement in Addendum 4 that the Department would add the required moisture barrier afterward by change order set up a situation where bidders had no idea how much the Department would be willing to pay for the change order. Further, the moisture barrier was not the only thing required by the new rules. Potential bidders may not have bid due to these uncertainties. The Department agreed with Bookhardt's assertions and rejected all bids . . . . Notwithstanding Spinella's protest, the Department issued a second invitation to bid on the project in question. As of the final hearing, the bids received in response to this second solicitation were scheduled to be opened on August 12, 2008. Ultimate Factual Determinations The Department's decision to reject all bids is premised, ultimately, on the notion that the Directive told prospective bidders to ignore an applicable rule in preparing their respective bids.5 If this were true, then the Directive could have been a source of potential confusion, as the Department argues, because a prudent bidder might reasonably hesitate to quote a price based on (possibly) legally deficient specifications. The Directive, however, did not instruct bidders to ignore an applicable, existing rule. Rather, under any reasonable interpretation, it instructed bidders to ignore a proposed rule and follow existing law. Such an instruction was neither confusing nor inappropriate. To be sure, the first sentence of the Directive——at least when read literally——misstated a fact. It did so by expressing an underlying assumption, i.e. that Rule 9B-3.0475 recently had been changed, which was incorrect. In fact, as of February 5, 2008, the Rule was exactly the same as it had always been. (It would remain that way for the next two months, until April 6, 2008).6 DEP's misstatement about the Rule might, conceivably, have confused a potential bidder, at least momentarily. But DEP did not factor the potential for such confusion into its decision to reject all bids, and no evidence of any confusion in this regard was offered at hearing.7 More important is that the unambiguous thrust of the Directive was to tell bidders to rely upon the "not recently changed" Rule 9B-3.0475, which could only have meant Florida Administrative Code Rule 9B-3.0475 (2007) as originally adopted, because that was the one and only version of the Rule which, to that point, had ever existed. Thus, even if the Department were operating under the mistaken belief, when it issued the Addendum, that Rule 9B-3.0475 recently had been amended; and even if, as a result, DEP thought it was telling prospective bidders to ignore an applicable, existing rule, DEP nevertheless made clear its intention that prospective bidders follow the original Rule 9B- 3.0475, which was in fact the operative Rule at the time, whether or not DEP knew it. Indeed, as any reasonable potential bidder knew or should have known at the time of the Addendum, (a) the Commission recently had approved the Revised Manual, but the contents thereof would not have the force and effect of law unless and until the Revised Manual were adopted as a rule, which had not yet happened; (b) the Commission had initiated rulemaking to amend Rule 9B-3.0475 so as to adopt the Revised Manual as a rule, but the process was pending, not complete; (c) Rule 9B-3.0475 had not been amended, ever; and, therefore, (d) the Manual still had the force and effect of law. See endnote 6. The Directive obviously could not alter or affect these objective facts. At bottom, then, a reasonable bidder, reviewing the Directive, would (or should) have concluded either (a) that the "recent change" which DEP had in mind was the Commission's approval of the Revised Manual (or the subsequent announcement of the proposed amendment to Rule 9B-3.0475) or (b) that DEP mistakenly believed the Rule had been changed, even though it had not been. Either way, a reasonable bidder would (or should) have known that the Department wanted bidders to prepare their respective bids based not on the Revised Manual, but the Manual. In other words, regardless of what DEP subjectively thought was the existing law, DEP clearly intended (and unambiguously expressed its intent) that bidders follow what was, in fact, existing law. This could not have confused a reasonable bidder because, absent an instruction to exceed the minimum required legal standards (which the Directive was not), a reasonable bidder would have followed existing law in preparing its bid, just as the Directive required. Once it is determined that the Directive did not, in fact, instruct bidders to ignore an applicable, existing law, but rather told them to rely upon the applicable, existing law (notwithstanding that such law might change in the foreseeable future), the logic underlying the Department's decision to reject all bids unravels. Simply put, there is no genuine basis in logic or fact for concluding that the Addendum caused confusion. The other grounds that DEP has put forward do not hold water either. Contrary to the Department's contention, the possibility that a Change Order would be necessary if an "additional water barrier" were required could not possibly have confused potential bidders or caused them to be uncertain about how much money the Department would be willing to pay for such extra work. This is because Article 27 of the Construction Contract prescribes the procedure for entering into a Change Order, and it specifies the method for determining the price of any extra work. See ITB at 102-05. The fact that the proposed amendment to Rule 9B-3.0475, if it were to be adopted and become applicable to the instant project, might require other additional work, besides a water barrier, likewise could not reasonably have caused potential bidders to refrain from bidding, for the same reason: The Construction Contract contains explicit provisions which deal with the contingency of extra work or changes in the work. Id. In sum, DEP's intended decision to reject all bids cannot be justified by any analysis that a reasonable person would use to reach a decision of similar importance. It is, therefore, arbitrary.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department enter a final order finding that its decision to reject all bids was arbitrary. Because the Department elected not to comply with the statutory directive to abate this procurement pending the outcome of Spinella's protest, with the result that the contract at issue possibly has been awarded already to another bidder; and because the choice of remedies for invalid procurement actions is ultimately within the agency's discretion, the undersigned declines to make a recommendation regarding the means by which DEP should rectify the harm to Spinella, but he urges that other appropriate relief be granted if Spinella cannot be awarded the contact. DONE AND ENTERED this 2nd day of October, 2008, in Tallahassee, Leon County, Florida. JOHN G. VAN LANINGHAM Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 2nd day of October, 2008.
The Issue Whether in making a preliminary decision to award a contract for the subject services under Invitation to Bid No. 12-039T – Refuse Services (the ITB) Respondent School Board of Broward County, Florida (the School Board) acted contrary to a governing statute rule policy or project specification; and if so whether such misstep(s) was/were clearly erroneous, arbitrary or capricious, or contrary to competition. Specifically, Petitioner Ace Waste Services, LLC (Petitioner) challenges the determination that the bids submitted by the apparent low bidder, the apparent low second low bidder, and the apparent low third low bidder were responsive and responsible bids meeting the specifications contained in the ITB.
Findings Of Fact School Board Policy 3320 entitled "Purchasing Policies" is the agency's rule governing the purchasing of goods and services. On October 7, 2011, the School Board issued the ITB which was entitled "Refuse Services." On October 18, 2011, the School Board issued Addendum No. 1 to the ITB. The refuse services were to be provided to 58 district school sites, which were collectively referred to as Group 1. The Bidder Acknowledgement found at Section 1.0 of the ITB states in pertinent part as follows: I agree to complete and unconditional acceptance of this bid all appendices and contents of any Addenda released hereto; I agree to be bound to all specifications terms and conditions contained in this ITB . . .. I agree that this bid cannot be withdrawn within 90 days from due date. Section 3 of the ITB states as follows at General Condition 3(b): MISTAKES: Bidders are expected to examine the specifications delivery schedules bid prices and extensions and all instructions pertaining to supplies and services. Failure to do so will be at Bidder's risk. Section 3 of the ITB states as follows at General Condition 35: PROTESTING OF BID CONDITIONS/SPECIFICATIONS: Any person desiring to protest the conditions/specifications of this Bid/RFP or any Addenda subsequently released thereto shall file a notice of intent to protest in writing within 72 consecutive hours after electronic release of the competitive solicitation or Addendum and shall file a formal written protest with ten calendar days after the date the notice of protest was filed. Saturdays Sundays legal holidays or days during which the school district administration is closed shall be excluded in the computation of the 72 consecutive hours. If the tenth calendar day falls on a Saturday Sunday legal holiday or day during which the school district administration is closed the formal written protest must be received on or before 5:00 p.m. ET of the next calendar day that is not a Saturday Sunday legal holiday or days during which the school district administration is closed. Section 120.57(3)(b) Florida Statutes as currently enacted or as amended from time to time states that "The formal written protest shall state with particularity the facts and law upon which the protest is based." Failure to file a notice of protest or to file a formal written protest within the time prescribed by [section 120.57(3)(b)] or a failure to post the bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under School Board Policy 3320 and [chapter 120]. The failure to post the bond required by School Board Policy 3320 Part VI within the time prescribed by School Board Policy 3320 Part VI as currently enacted or as amended from time to time shall constitute a waiver of proceedings under School Board Policy 3320 and [chapter 120]. Notices of protest formal written protests and the bonds required by School Board Policy 3320 Part VI shall be filed at the office of the Director of Supply Management and Logistics 7720 West Oakland Park Boulevard, Suite 323 Sunrise, Florida 33351 (fax 754-321-0936). Fax filing will not be acceptable for the filing of bonds required by School Board Policy 3320 Part VI. Section 3 of the ITB states as follows at General Condition 36: POSTING OF BID RECOMMENDATIONS/TABULATIONS: Any person who files an action protesting an intended decision shall post with the School Board at the time of filing the formal written protest a bond payable to the School Board of Broward County Florida in an amount equal to one percent (1%) of the Board's estimate of the total volume of the contract. The School Board shall provide the estimated contract amount to the vendor within 72 hours excluding Saturdays Sundays legal holidays and other days during which the School Board administration is closed of receipt of notice of intent to protest. The estimated contract amount shall be established on the award recommendation as the "contract award amount." The estimated contract amount is not subject to protest pursuant to [section 120.57(3)]. The bond shall be conditioned upon the payment of all costs which may be adjudged against the protestant in an Administrative Hearing in which the action is brought and in any subsequent appellate court proceeding. In lieu of a bond the School Board may accept a cashier's check official bank check or money order in the amount of the bond. If after completion of the Administrative Hearing process and any appellate court proceedings the School Board prevails the School Board shall recover all costs and charges which shall be included in the Final Order or judgment including charges made by the Division of Administrative Hearings but excluding attorney's fees. Upon payment of such costs and charges by the protestant the bond shall be returned. If the protestant prevails then the protestant shall recover from the Board all costs and charges which shall be included in the Final Order or judgment excluding attorney's fees. Section 3 of the ITB states as follows at Special Condition 1: INTRODUCTION AND SCOPE: The School Board of Broward County Florida (hereinafter referred to as "SBBC") desires bids on REFUSE SERVICES for solid waste removal as specified herein. Prices quoted shall include pick up at various schools departments and centers within Broward County Florida. Section 4 of the ITB states as follows at Special Condition 3: AWARD: In order to meet the needs of SBBC Bid shall be awarded in its entirety to one primary and one alternate responsive and responsible Bidders meeting specifications terms and conditions. The lowest Awardee shall be considered the primary vendor and should receive the largest volume of work. Therefore it is necessary to bid on every item in the group and all items (1-58) in the group must meet specifications in order to have the bid considered for award. Unit prices must be stated in the space provided on the Bid Summary Sheet. SBBC reserves the right to procure services from the alternate Awardee if: the lowest Bidder cannot comply with service requirements or specifications; in cases of emergency; it is in the best interest of SBBC. After award of this bid any Awardee who violates any specification term or condition of this bid can be found in default of its contract have its contract canceled be subject to the payment of liquidated damages and be removed from the bid list and not be eligible to do business with this School Board for two years as described in General Conditions 22 and 55. Section 4 of the ITB states as follows at Special Condition 7: ADDING OR DELETING SITES: SBBC may during the term of the contract add or delete service wholly or in part at any SBBC location. When seeking to add a location SBBC shall request a quote from both Awardees. The lowest Bidder shall receive an award for the additional location. If additional service is requested for an existing site already receiving service the current service provider will be contacted to provide a new quote based on the pricing formula submitted in response to this ITB or a subsequent quote. Section 4 of the ITB states as follows at Special Condition 11: RECEPTACLES: The Awardee shall furnish receptacles in good repair. . . .The Awardee shall furnish any and all equipment materials supplies and all other labor and personnel necessary for the performance of its obligations under this contract. Design of all equipment is subject to the approval of the Manager Energy Conservation Utility Management or his designee and must be replaced upon notification without additional cost to SBBC. DESCRIPTION: All receptacles used for solid waste referenced in Group 1 on the Bid Summary Sheets and the Tamarac location listed in Section 5 Additional Information unless otherwise indicated shall be provided by the Awardee at no additional cost. Bin receptacles shall be provided for SBBC use in the cubic yard capacities as indicated on the Bid Summary Sheets. Receptacles shall be bin-type units steel or plastic lift-up lids NO SIDE DOORS unless specifically requested for 8 cu. yd. fitted for automatic loading on casters where necessary for chute operations. (Receptacles not on casters must have a 6" – 12" clearance from ground to bottom of bin for easy cleaning underneath.) TWO AND THREE YARD CONTAINERS: It will be necessary for The Awardee to supply the two (2) and three (3) yard containers to hold compacted refuse at a ratio of approximately 4:1. These containers are designed for front-end loading. THESE UNITS ARE IDENTIFIED ON THE BID SUMMARY SHEET BY A SINGLE ASTERISK (*) NEXT TO THE CONTAINER SIZE. Section 4 of the ITB states as follows at Special Condition 20: SMALL IN-HOUSE COMPACTION UNITS(approximately two yards): The following schools have in-house compaction units which will need to be provided by the Awardee. Waste is compacted at an approximate ratio of 3:1. Collins Elementary Oakridge Elementary Sheridan Hills Elementary Section 4 of the ITB states as follows at Revised Special Condition 14: PRICING – ALL INCLUSIVE COST GROUP 1 ITEMS 1– 58: Bidder shall submit fixed monthly costs where indicated on the Bid Summary Sheets for each location based on 4.33 weeks per month. (This number is derived by dividing 52 weeks by 12 months). Monthly costs stated shall be an all-inclusive cost for providing receptacles refuse removal and disposal including but not limited to all necessary labor services material equipment taxes tariffs franchise fees maintenance and applicable fees. SBBC agrees to pay the Broward County Disposal Adjustment (tipping fees) in effect at the time. Increases to this fee will be paid as assessed by Broward County. Any decreases in these rates shall be passed on to SBBC as well. No bid specification protest was filed by any person concerning the original ITB or Addendum No. 1. Nine companies submitted timely responses to the ITB. Each bidder submitted a monthly bid and an annual bid. The School Board thereafter ranked the respective bids. Intervenor was the apparent low bidder with a monthly bid of $39,576 and an annual bid of $474,918.38. All Service was the apparent second low bidder with a monthly bid of $40,540.90 and an annual bid of $486,490.80. WSI was the apparent third low bidder with a monthly bid of $47,671.71 and an annual bid of $572,060.52. Petitioner was the apparent fourth low bidder with a monthly bid of $50,177.73 and an annual bid of $602,132.76. On November 2, 2011, the School Board's Purchasing Department posted the agency's intended recommendation for award of the ITB. The intended decision was (A) to award to Intervenor as the primary vendor for Group 1 (1 through 58); and (B) to award to All Service as the first alternate for Group 1 (1 through 58). On November 4, 2011, Petitioner timely filed its Notice of Protest with the School Board's Purchasing Department. On November 14, 2011, Petitioner timely filed its Formal Bid Protest with the School Board's Purchasing Department and delivered the required bid protest bond. The School Board formed a Bid Protest Committee that met with Petitioner on December 19, 2011, to consider Petitioner's formal written protest in accordance with section 120.57(3)(d)(1) and School Board Policy 3320. The parties were unable to resolve the protest by mutual agreement and the School Board sent Petitioner a notice of non-resolution of dispute. Section 1 of the ITB precludes a bidder from withdrawing its bid within 90 days of its submission to the School Board. At the time of the formal hearing 106 days had passed since the submission of bids. No bidder, including Intervenor, has indicated that it committed an error in calculating its prices submitted under the ITB or asked the School Board to excuse it from the prices it offered under the ITB. To the contrary, Intervenor's counsel represented at the formal hearing that Intervenor was standing by its bid. Generally, compacted waste is heavier and more expensive to dispose of than non-compacted waste. The ITB identifies the number and size (in cubic yards) of the receptacles to be placed at each location and the number of pick-ups per weeks to occur for each receptacle. The ITB also informs the bidders whether a receptacle was compacted or non-compacted. If compacted the ITB set forth the ratio of compaction. Bidders were also asked to bid a monthly cost and any applicable fees charged by the facility receiving the waste to arrive at total monthly cost for each receptacle to be furnished. The bidders were required to provide a total monthly bid for the services and a total annual bid for the services. The bidders were to use the information set forth in the ITB to calculate their bids. Petitioner asserts that the bids submitted by Intervenor, All Service, and WSI were not responsible bids because those bids failed to factor in the higher costs of disposing of waste that had been compacted. Petitioner contends that the reference to compaction ratios constitute specifications by the School Board to require all bidders to calculate their pricing utilizing the compaction ratios. Petitioner describes the referenced compaction ratios as "multipliers" that needed to be used by the bidders in calculating their prices for handling and disposing of compacted waste. Petitioner is seeking to impose its interpretation of the ITB as requiring each of the bidders to calculate its bid using the same pricing methodology that Petitioner employed. There is no ambiguity in the ITB, and there is no factual basis to conclude that all bidders were required to prepare their bids in the same fashion as Petitioner. There is nothing set forth in the ITB that required the School Board to interpret its reference to the compaction ratios as being a specification of a "multiplier" for pricing as opposed to a description of the capacity of the receptacles to be used at each of the school locations. At no point is the word "multiplier" used in the ITB to specify that the bidders were required to engage in mathematics involving multiplying their prices against some unit price the bidders were specifying in their bids. The ITB specifies the frequency with which the varying container sizes needed to be picked up at each of the 58 schools with the weight or volume of the container not being a factor in setting the specification of how often the container is to be picked up by the awardee. No adjustments were to be made to the prices paid by the School Board based on the weight of the container when removed. The School Board did not specify in the ITB that a bidder was required to charge the same monthly cost at each school for a similarly-sized refuse container nor did the School Board require different pricing for compacted waste as compared to non-compacted waste. Petitioner's assertion that the bidders were required to use those ratios as a multiplier when bidding on the cost of disposing of compacted waste is rejected as being contrary to the plain language of the ITB. The compaction ratios were provided to the bidders as information only. There is no requirement that a bidder use a particular methodology in determining its bid amounts.
Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law it is RECOMMENDED that the School Board of Broward County Florida enter a Final Order that adopts the findings of fact and conclusions of law contained herein, dismisses the protest filed by Petitioner Ace Waste Services LLC, and upholds the award of the procurement to Choice as primary awardee and to All Service as alternate awardee. DONE AND ENTERED this 20th day of March 2012, in Tallahassee Leon County Florida. S Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 20th day of March 2012.
The Issue The issue presented is whether the Department should award the contract for State Project numbered DOH 95209100 to Petitioner.
Findings Of Fact State Project numbered DOH 95209100 commenced with an invitation to bid on a construction project which involved the restoration and adaptive use of the Gato Cigar Factory in Key West, Florida. The construction would rehabilitate that existing historic structure and construct internal office and clinic spaces for both Monroe County and the Department of Health. Since both agencies would use the building, the project was divided between them. Monroe County and the Department issued separate invitations to bid for their portions of the structure, and each will enter into its own contract with the winning bidder or bidders. It was not required that a bidder submit a bid for both the Monroe County and the Department portions of the work. Any bidder could bid on one or the other or both. Although the invitations to bid and the contracts to result therefrom were not interrelated, some of the construction work was interrelated as some of the systems being installed under one contract would directly affect the other contract. For example, both the air conditioning system and the roofing system, although being performed under one entity's contract, would be applicable to both projects. The Department's invitation to bid required bidders to submit a base price, plus specific prices on particular items. Alternate numbered 1 added to the base price the cost of a second air conditioning chiller. The base price plus alternate numbered 1, taken together, included all work to be performed under the Department's scope of work. Alternates numbered 2 through 5 were deductions from the work included in the base price. Alternates numbered 2 through 5 were included in the Department's invitation to bid to cover the possibility that all bids might come in over budget. In that event the Department could select Alternates numbered 2 through 5, sequentially, until sufficient items had been deducted from the Department's scope of work to result in bids under the amount budgeted by the Department for the project. Section 01030 of the bid specifications is entitled "Alternates." Section 1.2E of Part 1 provides, in part, as follows: Include as part of each Alternate, miscellaneous devices, accessory objects and similar items incidental to or required for a complete installation whether or not mentioned as part of the Alternate. Each Alternate Bid must interface with the work being constructed under a separate contract with Monroe County. Each Alternate Bid item is also applicable to the Monroe County work. An alternate which is deducted from one project will be added to the other. If bidding both projects, the Deductive Alternate price for one project must match the Add Alternate price for the other project. The prospective bidders were also given this information in the pre-bid meetings. The Department received a number of bids for less than the amount budgeted for its portion of the work. Accordingly, the Department was able to select Alternate numbered l, which taken together with the base bid, covered the entire scope of work allocated to the Department. The lowest bids through Petitioner's bid were as follows: Bidder Total Bid D. L. Porter Construction, Inc. $1,418,744. McTeague Construction Co., Inc. $1,454,500. Lodge Construction, Inc. $1,501,500. Rovel Construction, Inc. $1,559,000. Neither McTeague Construction Co., Inc., nor Lodge Construction, Inc., participated in this proceeding to challenge the Department's intended bid award. For the lowest bidder, Intervenor Porter, discrepancies occurred in its first, third, and fifth alternative prices of $3,500, $375, and $l,497, respectively. For the second lowest bidder, McTeague, a discrepancy of $9,000 occurred in its first alternate price. For the third lowest bidder, Lodge, a discrepancy of $3,165 occurred in its fifth alternate price. For the fourth lowest bidder, Petitioner Rovel, there were no discrepancies in any of its alternate prices. Porter's bid on Alternate numbered 1 for the Department was $38,500. Porter's bid on Alternate numbered 1 for Monroe County was $35,000. Porter's estimating staff overlooked the instruction that the two numbers should match. The reason for the difference between the two Alternate numbered 1 amounts is that the bidders were instructed to prepare the two bids as two separate contracts. Alternate numbered 1 required moving one of two chillers from the Monroe County project to the Department's project. Porter could not assume that it could use the crane from the contractor on Monroe County's portion of the project to install this chiller in the Department's portion of the project. Therefore, the cost of a crane had to be added to the Department's project, but the cost of the crane could not be deducted on the Monroe County bid. Porter was the fourth highest bidder on the Monroe County project. Monroe County has not yet awarded its contract. If the Monroe County project is awarded based upon the bids submitted, Porter will not be awarded the Monroe County project. The Department's bid tabulation and notice of intended award were prepared without any reference to the bid opening for the Monroe County project and before the contents of the Monroe County bids were known by the Department. The deviation in price between Porter's Alternate numbered 1 bids did not give Porter an advantage over the other bidders, several of whom made the same error. It was a minor deviation, not a material one. The price submitted on the Department's bid reflected the actual cost of performing that portion of the work. Petitioner's bid listed Florida Keys Electric, Inc., as its electrical subcontractor, its fire alarm subcontractor, and its lightening protection subcontractor. That company is not certified by the State of Florida, but it is registered. The bid specifications provide in section B-14, in part, as follows: Any bidder who lists a subcontractor not certified and/or registered by the State to perform the work of his trade if, such certification or registration is required for the trade by Florida Laws, will be rejected as non-responsive. No change shall be made in the list of subcontractors, before or after the award of a contract, unless agreed to in writing by the Owner. Section 16010, Part 1, section 1.9, subsection A., of the technical specifications which form a part of the bid specifications involves supervision of the construction and provides, in part, that "At least one member of the Electrical Contracting Firm shall hold a State Master Certificate of Competency." Florida Keys Electric, Inc., would use Delor J. Ellis as its qualifying agent. Although Ellis is certified by the State, at the time of the bid submittal and through the date of the final hearing in this cause, Ellis' license was in an inactive status, and no application to activate his license was pending with the State of Florida. Fire alarm work and lightening protection work require a specialty license in the State of Florida. Florida Keys Electric, Inc., is not licensed to perform either type of work. When Florida Keys Electric, Inc., contracts to perform such work, it does so through its own subcontractor. Although the requirement for certification and/or registration contained in the bid specifications is not consistent with the requirement for State certification contained in the technical specifications portion of the bid specifications, Petitioner did not comply with either provision. Accordingly, Petitioner's bid is not responsive to the bid specifications. Porter, which submitted the lowest bid, is responsive to the bid specifications and is, therefore, the lowest responsive bidder.
Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that a final order be entered finding Petitioner's bid to be non-responsive, dismissing Petitioner's bid protest, and awarding to D. L. Porter Construction, Inc., the contract for the restoration of the Gato Cigar Factory. DONE AND ENTERED this 27th day of April, 1999, in Tallahassee, Leon County, Florida. LINDA M. RIGOT Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 27th day of April, 1999. COPIES FURNISHED: Angela T. Hall, Agency Clerk Department of Health 2020 Capital Circle, Southeast BIN A02 Tallahassee, Florida 32399-1703 Pete Peterson, General Counsel Department of Health 2020 Capital Circle, Southeast BIN A02 Tallahassee, Florida 32399-1703 Robert A. Hingston, Esquire Welbaum, Guernsey, Hingston, Greenleaf & Gregory, L.L.P. 901 Ponce de Leon Boulevard, Penthouse Suite Coral Gables, Florida 33134 Michael E. Cover, Esquire Morton R. Laitner, Esquire Department of Health Miami-Dade County Health Department 1350 Northwest 14th Street Miami, Florida 33125 William G. Christopher, Esquire Brown Clark, A Professional Association 1819 Main Street, Suite 1100 Sarasota, Florida 34236
The Issue Whether the Florida A&M University's intended action to reject all bids and re-advertise the project to construct "Utilities Improvement-Central Chilled Water Plant, Phase V", known as BR-389, is illegal, arbitrary, dishonest, or fraudulent.
Findings Of Fact Based on the oral and documentary evidence presented at the final hearing and on the entire record of this proceeding, the following findings of fact are made: Parties Neel Mechanical Contracting, Inc., is a Georgia corporation authorized to do business in Florida and licensed by the Florida Construction Industry Licensing Board. Its business is air conditioning, and it specializes in larger projects such as the one at issue herein. Robert C. Sullivan is the President of Neel Mechanical. Thomas Gregory Lang is a project manager employed by Neel Mechanical and the chief estimator for Neel Mechanical; Mr. Lang is the person primarily responsible for preparing Neel Mechanical's bid proposal for Project BR-389. The Florida Board of Regents is a corporate body consisting of the Commissioner of Education and thirteen citizens appointed by the Governor and approved by three members of the Cabinet; it is subject to the general supervision and control of the Department of Education. Sections 240.203(2), 240.205, and 240.207(1), Florida Statutes (1999). The Board of Regents is a member of the State University System, is charged generally with overseeing the state universities, and has the authority to approve and execute contracts for "construction for use by a university when the contractual obligation exceeds $1 million." Sections 240.209 and 240.205(6), Florida Statutes (1999). 4/ Florida Agricultural and Mechanical University ("FAMU") is a public university located in Tallahassee, Florida, and is one of ten universities in Florida's State University System. Section 240.2011, Florida Statutes (1999). The university president is the chief administrative officer of the university and is responsible for its operation and administration. Section 240.227, Florida Statutes (1999). At the times material to this proceeding, Frederick S. Humphries was president of FAMU, and Samuel J. Houston was the Director of FAMU's Office of Facilities Planning and Construction. Mr. Houston has primary responsibility for supervising the bid process and the staff that prepared the bid documents and evaluated the bids for Project BR-389. Mr. Houston acts in this capacity on behalf of President Humphries and the Board of Regents. Mr. Houston also is ultimately responsible for the administration of Project BR-389. Bayou Mechanical, Inc. ("Bayou Mechanical") is a mechanical contractor which submitted a bid on Project BR-389. Call for Bids In Volume 25, Number 13, of the Florida Administrative Weekly, dated April 2, 1999, FAMU, on behalf of the Board of Regents, issued a Call for Bids on Project BR-389, which involves construction of a chilled water plant on the FAMU campus. The Call for Bids provided that all bidders must have a valid Florida license to do the work at the time of bid opening and a minimum of five years experience with similar projects. Project BR-389 involves a construction contract and is the fifth phase of the construction of an underground chilled water system on the FAMU campus. The project consists of constructing a portion of the system and connecting it to the existing system. The Call for Bids notified prospective bidders that sealed bids would be received at FAMU on May 4, 1999, until 2:00 p.m., after which time the bids would be opened and the bid tabulations posted. The Call for Bids further provided: "Bids must be submitted in full and in accordance with the requirements of the drawings and Project Manual." The Call for Bids advised that these documents were available at the offices of the Architect/Engineer for the project, Bosek, Gibson & Associates, Inc. ("Bosek, Gibson"), in Tallahassee, Florida. In Addendum #2 to the Project Manual, dated April 30, 1999, the date for submission of bids was changed from May 4, 1999, to May 11, 1999. The Project Manual contains Instructions to Bidders, consisting of pages 6 of 106 through 22 of 106 and dated October 16, 1989; General Conditions of the Contract for Construction, consisting of pages 23 of 106 through 106 of 106 and dated October 16, 1989; Special Conditions of the Contract, consisting of pages I-1 through I-10 and dated October 16, 1989; Supplement J to the Project Manual, consisting of pages 1 through 11 and dated February 13, 1996; Supplement K to the Project Manual, consisting of pages 1 through 5 and identified as the February 1999 Revision; Exhibit L, Supplementary Conditions to the General Conditions of the Contract for Construction, consisting of pages 2 through 16; and the Technical Specifications, which are separately identified and numbered. As noted in the Call for Bids, drawings are also included in the bid documents. Neel Mechanical, Bayou Mechanical, and Council Contracting submitted bids for Project BR-389 on May 11, 1999, the date on which the bids were opened and the price proposals were read. According to the Bid/Proposal Tabulation form that was posted from May 14 through 19, 1999, Neel Mechanical was the apparent low bidder on the base bid and on the two alternates 5/; Neel Mechanical's base bid and its bid on alternates were within FAMU's budget for the project. Bayou Mechanical submitted the second lowest bid on the base bid and the alternates; Bayou Mechanical was within the budget on the base bid but over budget on the alternates. No recommended award or intent to award was indicated on the Bid/Proposal Tabulation form. Shortly after the bids were opened, several issues were raised with respect to the bid process. First, the FAMU staff discovered that Neel Mechanical had failed to affix its corporate seal to the signature page of the bid Proposal Form and to the Bid Bond that was part of the bid submission. Second, York International Company ("York") sent via facsimile on May 11, 1999, a letter advising FAMU's Office of Facilities Planning and Construction that York intended to protest the bid. This letter raised the third issue: Of the two manufacturers identified in the project specifications, York and The Trane Company ("Trane"), only Trane manufactured a chiller that could meet the project specifications. Fourth, Mark A. Daughtery, a project manager for Bayou Mechanical, sent a letter dated May 14, 1999, to Craig Allen at Bosek, Gibson advising him that Bayou Mechanical intended to file a formal protest on Project BR-389 and identifying two issues of concern to Bayou Mechanical: Neel Mechanical's failure to affix its corporate seal to its bid submission and "the Chiller being sole sourced to Trane Company." Each of these issues is discussed in detail below. Corporate Seal The Instructions to Bidders contained in the Project Manual provide: B-16 Preparation and Submission of Bids Each Proposal shall be submitted on the form contained in the Project Manual and bid prices shall be indicated thereon in proper spaces, for the entire Work and for all Alternates. (See B-8) In the event of a discrepancy in the bid amount on the Proposal between the numeric and written quotes, the written amount will govern. Each Proposal must give the full business address of the Bidder and state whether it is an individual, corporation or partnership. Proposals by a corporation must be signed with the legal name and seal of the corporation followed by the name of the state of its incorporation and the manual signature and designation of an officer, agent or other person authorized to bind the corporation. (Emphasis added.) When it was submitted on May 11, 1999, Neel Mechanical's bid did not include the impression of its corporate seal on the bid Proposal Form signature page or on the Bid Bond submitted as part of the proposal. After the bid opening, an employee of Neel Mechanical received a telephone call from Henry Swift, FAMU's Project Manager for Project BR-389, in which he advised Neel Mechanical that its bid had not been sealed. This conversation was followed by a request from Mr. Swift, sent via facsimile transmittal to Neel Mechanical on May 13, 1999, requesting a "Letter of Clarification which confirms your status as a corporation licensed to do business in the State of Florida, registered with the Secretary of State, etc. Finally, please be sure to sign and seal your letter with your corporate seal." A letter to Mr. Swift, dated May 14, 1999, was signed and sealed by Robert C. Sullivan, President of Neel Mechanical. The letter was received in FAMU's Office of Facilities Planning and Construction on May 19, 1999. Shortly after Mr. Sullivan sent the May 14, 1999, letter, Neel Mechanical received another telephone call from Mr. Swift in which he advised Neel Mechanical that the seal needed to be physically affixed to the bid Proposal Form. Peter Lang, a project manager employed by Neel Mechanical, had business in Tallahassee, so Mr. Sullivan asked that he take the seal to Mr. Swift's office and affix it to the bid Proposal Form. When Peter Lang arrived at Mr. Swift's office, someone brought out the file and gave him the bid Proposal Form, and he affixed Neel Mechanical's corporate seal to the signature page of the form. Neel Mechanical's corporate seal was not affixed to the Bid Bond, although the seal of the surety company was on the Bid Bond when the bid was submitted. The Bid Bond was part of Neel Mechanical’s bid submission. FAMU verified on May 13, 1999, that Neel Mechanical was authorized to do business in Florida and held the requisite Florida license to perform the work required by the project. Centrifugal chiller specifications and York's letter of "intent to protest" Section 15685-1 of the Technical Specifications included in the Project Manual contains the specifications for the Centrifugal Chillers - Water Cooled to be installed as part of Project BR-389. Those specifications provide in pertinent part: PART 2 - PRODUCTS MANUFACTURERS Available Manufacturers: Subject to compliance with requirements, provide centrifugal chillers from one of the following: Trane Co., The York Int'l. UNIT DESCRIPTION: * * * Refrigerant: Chiller shall be provided with low pressure refrigerant HCFC-123. The size of the chiller specified for Project BR-389 was 2200 tons. 6/ Lane Jackins is the owner of Applied Mechanical Equipment and is a manufacturer's representative for York. He reviewed the technical specifications for the chiller contained in Part II of Section 15685-1 of the Technical Specifications for Project BR-389 and determined that York could not furnish a chiller that met the specifications. York does not manufacture a chiller of 2200 tons that uses R123 refrigerant, although it uses R123 refrigerant in smaller machines up to 750 tons. The equipment manufactured by York in the 2,000-ton range uses R134A refrigerant, which operates at different pressures than R123. The York equipment using R134A refrigerant is of an entirely different design than that using R123 refrigerant. In addition, York does not manufacture a chiller with the voltage required by the project specifications. Three or four days before the bids were to be submitted, either Mr. Sullivan or Mr. Lang spoke with Mr. Jackins about York's providing Neel Mechanical with a price for the chiller. Mr. Jackins responded that York would not submit a price for the equipment because York did not manufacture a chiller that would meet the technical specifications included in the bid documents. The Instructions to Bidders in the Project Manual provide: B-12 Basis for Bidding - Trade Names For clarity of description and as a standard of comparison, certain equipment and materials have been specified by trade names or manufacturers. To insure a uniform basis for bidding, the Bidder shall base the Proposal on the particular systems, equipment or materials specified and approved substitutes as provided in Paragraph 3.19, Substitutes, of the General Conditions. After bids are received, no equipment or materials will be approved as a substitute for the specified product. Paragraph 3.19 of the General Conditions provides: Substitutions Substitutions for a specified system, product or material may be requested of the Architect/Engineer, and the Architect/Engineer's written approval must be issued as an addendum before substitutions will be allowed. All requests for substitutions must be submitted prior to the opening of bids, and approvals shall be granted no less than seven (7) days prior to the bid date. Substitutions requested after that date will receive no consideration. Substitutions are changes in materials, equipment, methods, or sequences of construction, design, structural systems, mechanical, electrical, air conditioning controls, or other requirements of the Drawings or Specifications. (Emphasis in original.) In the portion dealing with "SPECIFICATIONS AND DRAWINGS," Section 15010 of the Technical Requirements, "MECHANICAL REQUIREMENTS," provides as follows: By submitting a bid for equipment or material other than the "Design Basis Equipment" (i.e., that which is shown on the Contract Drawings), the Contractor: Represents that he has personally investigated the proposed substitute product and determined that it is equal or superior in all respects to that specified and complies with all the requirements set forth in Paragraph 3.19 of the General Conditions; Certifies that the cost data presented is complete and includes all related costs under this Contract but excludes costs under separate contracts, and excludes the Engineer's redesign costs, and waives all claims for additional costs related to the substitution which subsequently become apparent; Will coordinate the installation of the accepted substitute, making such changes as may be required for the work to be complete in all respects; and, Certifies that the proposed equipment meets the requirements of the Contract Documents. Neither York nor any prospective bidder on Project BR-389 requested within the time limits specified in Paragraph 3.19 of the General Conditions that a York product be substituted for the chiller specified for Project BR-389. Mr. Lang contacted Craig Allen at Bosek, Gibson a day or two before bids were to be submitted and told Mr. Allen that York was not able to provide a chiller that met the project specifications. According to Mr. Lang, Mr. Allen responded that he "was totally surprised that they [York] didn't have a machine that was going to meet this spec." 7/ Mr. Lang based Neel Mechanical's bid on pricing information it received from Trane, which manufactures a chiller that meets the project specifications. An additional reason Mr. Lang based Neel Mechanical's bid on the Trane equipment was his belief that, all things being equal, FAMU preferred to have Trane equipment installed in Project BR-389 because other chillers installed at FAMU were manufactured by Trane. Mr. Lang believed that the specifications for the chiller had been deliberately drawn to require use of Trane equipment. In a letter dated May 11, 1999, the day the bids for Project BR-389 were submitted and opened, Mr. Jackins notified FAMU's Office of Facilities Planning and Construction that York intended to protest the bid on Project BR-389. Mr. Jackins stated in the letter: The chiller as specified is a flat specification. There is only one manufacturer that will meet the criteria as spelled out in the contract documents. This is not in the best interest of the University System of Florida or the State of Florida. An official protest outlining all the proprietary items will be forthcoming. The letter was sent via facsimile on May 11, 1999, prior to the time the bids were opened. Mr. Jackins believed that the "flat specification" was not in the best interest of the university because it precluded competitive pricing for the chiller. Mr. Sullivan learned on May 11 or May 12, 1999, that York intended to file a bid protest. Believing that Neel Mechanical would be awarded the contract as the apparent low bidder, Mr. Sullivan met with Mr. Jackins and several employees of Neel Mechanical, including Greg Lang, at which time Mr. Sullivan proposed an alternative to York's filing a bid protest. Mr. Sullivan told Mr. Jackins that, in his opinion, the situation could best be handled through a meeting between Neel Mechanical, Mr. Jackins, Mr. Houston, and the project engineers. According to Mr. Sullivan's plan, Mr. Jackins could present York's pricing, and FAMU, with the engineers’ assistance, could decide if they wanted to switch from the equipment specified in the bid documents to York equipment. If FAMU agreed to accept the York equipment, then, if it were awarded the contract, Neel Mechanical would purchase the York equipment rather than the Trane equipment Neel Mechanical had included in its proposal. After some discussion, Mr. Jackins agreed with Mr. Sullivan's proposed solution. Post-bid activity from the perspective of Neel Mechanical Immediately after the bids were opened, Craig Allen, an employee of Bosek, Gibson telephoned Mr. Lang and asked if Neel Mechanical was still happy with its bid. According to Mr. Lang, Mr. Allen stated that "this is a standard practice of mine on bid day to call the apparent low bidder and just make sure that they haven't found some colossal error in their math or whatever that made them low." 8/ Mr. Lang told Mr. Allen that Neel Mechanical was still happy with its bid. After this conversation, Mr. Lang waited for the letter from FAMU awarding the contract to Neel Mechanical. He was not concerned that the award was not made immediately because, in his experience, some time always passed between bid opening and the time the winning bidder received the contract. However, in anticipation of the award of the contract, Neel Mechanical proceeded to talk with subcontractors, to start scheduling the project, and to line up equipment that it would need to purchase for work on the project. Neel Mechanical employees also made several visits to the site of the project. At some point after the bids were opened, Mr. Sullivan heard that the procurement officials at FAMU were discussing with FAMU's legal department the issues of Neel Mechanical's failure to affix the corporate seal to its bid and the ramifications of York’s threatened bid protest. Mr. Sullivan responded by telephoning the office of FAMU's general counsel. He spoke with Faye Boyce about these issues and told her that he considered his failure to affix the corporate seal to Neel Mechanical's bid to be insignificant. He also advised her that he had worked out an arrangement with the representative of York whereby York would withdraw its protest and Neel Mechanical would talk with the engineers about the York chiller so a decision could be made whether they wanted to use the York equipment or stay with the Trane equipment which met the project specifications. In a subsequent telephone conversation with Ms. Boyce, Mr. Sullivan received the impression that she had looked into the issues he had raised in their previous telephone conversation. Mr. Sullivan could not recall Ms. Boyce's exact words, but had the impression from their conversation that the contract award to Neel Mechanical had been approved and that confirmation would be sent out shortly. At some point after Mr. Sullivan's conversation with Ms. Boyce, Greg Lang telephoned Henry Swift to find out the status of the contract award. Mr. Swift told Mr. Lang that, in Mr. Lang's words, "the problem had been reviewed and found to be insignificant, and . . . that the letter of intent to award had already been made." 9/ According to Mr. Lang, Mr. Swift told him that FAMU would notify the bidders of the intent to award the contract to Neel Mechanical. On the basis of this conversation, Mr. Lang believed that Neel Mechanical would receive a letter "just any day." When Neel Mechanical did not receive a letter, Mr. Lang telephoned Mr. Swift again. According to Mr. Lang, Mr. Swift stated that he did not know why the matter was being held up. After this second conversation with Mr. Swift, Mr. Lang telephoned Mr. Houston several times but did not receive a return call. Mr. Lang then wrote a letter to Mr. Houston, dated July 9, 1999, in which he inquired about the status of the contract award: It has now been almost two months since you received bids for this project, and as the low bidder we have still not received notification of your intent to award. We have had several telephone conversations with the attorney representing the regents in this matter, and we were lead [sic] to believe that we would have received information before this time. Please review this matter and call us. If there are outstanding issues which concern you, we would like to know about them and work with you to get them resolved. Post-bid activity from the perspective of FAMU Mr. Houston and members of his staff considered the omission of the corporate seal to be a minor deficiency in Neel Mechanical's bid proposal. Nonetheless, even though Neel Mechanical had been allowed to seal the bid Proposal Form, Mr. Houston asked FAMU's Office of General Counsel to conduct research and determine if the deficiency was one that could be waived. Mr. Houston was not involved in drawing up the technical specifications for Project BR-389; rather, he relied on the project engineers to be familiar with the products to be used in the project. Mr. Houston advised the project engineers that he wanted a competitive bid, and, because the chiller was a major component of the project, he instructed the engineers to prepare specifications that could be met by equipment produced by at least two manufacturers. In a letter dated May 18, 1999, Craig Allen, the engineer at Bosek, Gibson who prepared the specifications for Project BR-389, notified Mr. Houston that he was not aware until the "notice of protest" was received from York that York could not provide a chiller of the required capacity which used R123 refrigerant. Mr. Allen advised Mr. Houston that Mr. Jackins, the York representative, had indicated that he wanted to meet with Mr. Allen to discuss York's chiller selections for the project. A recommendation that the contract be awarded to Neel Mechanical was signed on June 8, 1999, by Phyllis Nottage, the Assistant Director of FAMU's Office of Facilities Planning and Construction; on June 10, 1999, by Mr. Houston; on June 14, 1999, by Louis Murray, an Associate Vice President of FAMU; and on June 14, 1999, by Robert Carroll, a Vice President of FAMU with supervisory authority over the Office of Facilities Planning and Construction. The recommendation was contained in a document entitled "Award of Construction Contract," which provided as follows: On May 11, 1999, bids were received for the above-referenced project within the approved budget for the Base Bid and Alternates One (1) through (2), in the total amount of $3,996,400. The requirements for the Minority Business Enterprise Plan as set forth in the project specifications have been satisfied by the Contractor. The consulting Architect/Engineer and the University Facilities Planning and Construction Office recommend the award of this contract to Neel Mechanical Contractors, Inc. President Humphries signed the Award of Construction Contract on June 17, 1999. The preparation and signing of the Award of Contract form and the preparation of the Letter of Intended Decision were part of the bid review process, but Mr. Houston considered them preliminary, without effect until the final decision on the contract award was made and the bidders were formally advised of FAMU's intended decision with respect to the award of the contract. On June 21, 1999, Mr. Houston received a telephone call from Kenneth Ogletree, Director of the Board of Regents’ Office of Facilities Planning, 10/ in which Mr. Houston was advised that the Board of Regents had received an inquiry from a legislator in reference to Project BR-389 and requesting that Mr. Houston prepare a response to the legislator's inquiry. Mr. Ogletree sent Mr. Houston, via facsimile on June 21, 1999, a copy of a letter dated May 28, 1999, from Carey Huff, President of Bayou Mechanical, to Durell Peaden, a member of the Florida House of Representatives and a State Representative from District In the letter, Mr. Huff complained that Neel Mechanical, although apparent low bidder for Project BR-389, had failed to seal the bid Proposal Form and the Bid Bond and that, therefore, Neel Mechanical's bid was non-responsive. Mr. Carey requested that Representative Peaden contact FAMU so that Bayou Mechanical would be awarded the contract for the project as lowest responsive bidder. Mr. Carey stated in his May 28, 1999, letter to Representative Peaden that the college had refused to allow Bayou Mechanical to examine Neel Mechanical's bid but that Mr. Houston had informed them that Neel Mechanical had failed to seal its bid properly. 11/ Mr. Ogletree also sent Mr. Houston, via facsimile on June 21, 1999, a copy of a letter from Representative Peaden to Dr. Adam W. Herbert, Chancellor of the State University System. In his letter, Representative Peaden asked that Dr. Herbert look into the matter and "see that all equity was followed in the bid process." In response to the Board of Regents' request that he respond to Representative Peaden's inquiry, Mr. Houston prepared a letter dated June 22, 1999. In this letter, which was directed to Mr. Ogletree, Mr. Houston stated that FAMU wished to award the contract for Project BR-389 to Neel Mechanical as the low bidder on the project. Mr. Houston stated that FAMU considered Neel Mechanical's failure to affix the corporate seal on the bid Proposal Form and the Bid Bond to be a minor discrepancy. Mr. Houston further stated that FAMU's Office of General Counsel agreed with the conclusion regarding the corporate seal issue and recommended that the contract be awarded to Neel Mechanical. Finally, Mr. Houston advised Mr. Ogletree that President Humphries had signed the "Award of Construction Contract" form and that Mr. Houston's office was preparing "Letters of Intended Decision" to be sent to the bidders. The final decision on the contract award had not been made on June 10, 1999, when Mr. Houston signed the recommendation that the contract for Project BR-389 be awarded to Neel Mechanical, nor had it been made on June 22, 1999, when Mr. Houston wrote his letter to Mr. Ogletree. Rather, on June 22, 1999, the issues raised with respect to the bid process for Project BR-389 were still being reviewed by Mr. Houston and his staff and by FAMU's Office of General Counsel. The decision to reject all bids on Project BR-389 was made on June 24, 1999. On that date, Mr. Houston met with Vice President Murray, FAMU's attorney, and the Assistant Director of the Office of Facilities Planning and Construction, and the issues relating to the bidding process for Project BR-389 were reviewed. Mr. Houston identified these issues as Neel Mechanical's failure to seal its bid Proposal Form and its Bid Bond; potential protests from York and from Bayou Mechanical; and the problem relating to the technical specifications for the chiller. Of these issues, Mr. Houston considered the most serious the fact that, of the two manufacturers listed in the bid specifications, only Trane could provide the chiller for Project BR-389. The chiller was a major part of the project, and Mr. Houston wanted at least two sources for the chiller in order to encourage competition so that FAMU would get the lowest possible price for the project. Mr. Houston was also concerned that the specifications for the chiller created a de facto "sole source" bid and that the bid solicitation would, therefore, be illegal because FAMU didn't satisfy the statutory requirements necessary for it to specify that the chiller be purchased from a sole source. 12/ FAMU's attorney advised the participants at the June 24, 1999, meeting that the legal department had found no precedent within the State University System for waiving the requirement in the bid documents that the bid Proposal Form and the Bid Bond be sealed with the bidder's corporate seal. The participants at the meeting considered all of the outstanding issues and decided that it would be in the best interests of FAMU to reject all bids submitted on May 11, 1999, for Project BR-389. After the decision to reject all bids was made, Mr. Houston marked an "X" through the Award of Construction Contract form signed by President Humphries, and he prepared letters notifying the bidders of the intent to reject all bids for Project BR-389. Neel Mechanical's bid protest In a letter to Neel Mechanical dated July 6, 1999, Mr. Houston stated: Bids on the above referenced project were opened May 11, 1999. However, we regret to inform you that all Bids have been rejected as in the best interest of the University. This project is presently being re-advertised in the Florida Administrative Weekly. The University apologizes for the time it has taken to reach this decision. We trust that you will cooperate with our course of action and look forward to receiving a proposal from you at the next opening. Thanks for your continued interest in the State University System's Construction Program. The envelope containing Mr. Houston's July 6, 1999, letter was post-marked July 9, 1999, and the letter was received by Neel Mechanical on Tuesday, July 13, 1999. The Instructions to Bidders in the Project Manual provide: Rejection of Bids The Owner reserves the right to reject any and all bids when in the opinion of the Owner such rejection is in the best interest of the Owner. Paragraph B-1 of the Instructions to Bidders provides that the Board of Regents is the owner of the project. On July 13, 1999, after Neel Mechanical received the letter from Mr. Houston notifying it that all bids on Project BR- 389 had been rejected, Mr. Sullivan and Greg Lang went to Mr. Houston's office to urge him to rescind the decision and award the contract to Neel Mechanical. Mr. Sullivan told Mr. Houston that they felt that the issue regarding the corporate seal was insignificant. At this time, Mr. Sullivan also told Mr. Houston that he and York had reached an agreement whereby York would withdraw its protest and Neel Mechanical would present the York product to the University and let the University decide if it wanted to go with the Trane chiller or switch to a York product. Mr. Sullivan thought that Mr. Houston was sympathetic to Neel Mechanical but that the decision had been made by the administration and the legal department. Mr. Sullivan also got the impression that the decision to reject all bids was based on the corporate seal issue. On July 13, 1999, Neel Mechanical hand-delivered its Notice of Intent to Protest Bid to Samuel J. Houston, Director of the Office of Facilities Planning and Construction at Florida A&M University and to FAMU's Office of General Counsel. There is no dispute that the Notice of Intent to Protest Bid was actually received in Mr. Houston's office on July 13, 1999. On July 23, 1999, Neel Mechanical hand-delivered its Formal Written Protest and Petition for Formal Administrative Proceedings to Sam Houston, Director, Florida A&M University, Facilities Planning Department, Plant Operations Facility, Building A, Room 100, 2400 Wahnish Way, Tallahassee, Florida 32307 and to FAMU's Office of General Counsel. Also on July 23, 1999, a copy of the Formal Written Protest and Petition for Formal Administrative Proceedings was sent by United States Mail to the Board of Regents, Office of General Counsel, 325 West Gaines Street, Suite 1454, Tallahassee, Florida 32399-1950. There is no dispute that the Formal Written Protest and Petition for Formal Administrative Proceedings was actually received in Mr. Houston's office on July 23, 1999. The Instructions to Bidders in the Project Manual dated October 16, 1989, provide: Bid Protest To be considered, a bid protest must be received by the Director, Capital Programs, Florida Board of Regents, 1601 Florida Education Center, 325 West Gaines Street, Tallahassee, Florida 32399-1950, as provided in Section 120.53, Florida Statutes. Failure to file a notice of protest in this manner shall constitute a waiver of the Bidder's right to proceedings under Chapter 120, Florida Statutes. * * * B-26 Special Conditions Bidders shall be thoroughly familiar with the Special Conditions and their requirements. (Emphasis added.) Supplement J to the Project Manual, consisting of pages 1 through 11 and dated February 13, 1996, provides in pertinent part: (This supplement revises portions of the Project Manual for State University System projects dated October 16, 1989, and supersedes any other previously issued supplements related to the referenced topics.) Revise the Instructions to Bidders Section of the Project Manual as Follows: * * * Revise Paragraph B-22, Bid Protest, to read as follows: B-22 Bid Protest Any person who is affected adversely by the Board of Regents decision or intended decision shall file with the Associate Vice Chancellor, Capital Programs, Florida Board of Regents, 1602 Florida Education Center, 325 West Gaines Street, Tallahassee, Florida 32399-1950, a notice of protest in writing within 72 hours, excluding Saturday, Sunday, and State legal holidays, after receipt of the bidding documents if the protest is directed toward the bidding conditions or after the notice of the Board of Regents decision or intended decision on contract award or bid rejection if the protest is directed toward contract award or bid rejection. Thereafter, a formal written protest by petition in compliance with Section 120.53(5), and Section 120.57, F.S., must be filed with the Associate Vice Chancellor, Capital Programs, Florida Board of Regents, 1602 Florida Education Center, 325 West Gaines Street, Tallahassee, Florida 32399-1950, within ten (10) days after the date the notice of protest was filed. Failure to file a timely notice of protest of [sic] failure to file a timely formal written protest petition shall constitute a waiver of protest proceedings. Any protest filed prior to receipt of the notice of the Board of Regents decision or intended decision will be considered abandoned unless renewed within the time limit provided for protests. (Emphasis added.) Supplement K to the Project Manual, consisting of pages 1 through 5, provides in pertinent part: SUPPLEMENT TO PROJECT MANUAL ISSUED BY FLORIDA A&M UNIVERSITY REGARDING PARAGRAPH B-26, SPECIAL CONDITIONS (February 1999 Revision) B-26 SPECIAL CONDITIONS - This supplement modifies paragraph B-26 by adding and clarifying bidding requirements and instructions. * * * PROTEST PROCEDURES: This paragraph supersedes the paragraph (No. B-22) under the general terms and conditions whereby the notice of intended protests or written formal protests including bonding requirements from bidders must be submitted to: Mr. Sam Houston, Director, Florida A&M University, Facilities Planning Department, Plant Operations Facility, Building A, Room 100, 2400 Wahnish Way, Tallahassee, FL 32307. A bid tabulation with the recommended award(s) will be posted at the address indicated in Paragraph B-26, sub- paragraph 6 (Posting of Bid Tabulation). Any notice of protest or formal written protest to the award or intended award which is filed before the bid tabulation posting is null and void. To be considered, a notice of protest or formal written protest must be filed within the time limits set forth in Section 120.57(3)(b), Florida Statutes. Any notice of protest or formal written protest to the specifications issued by the University must be filed within the time limits set forth in Section 120.57(3)(b), Florida Statutes. Any notice of protest or formal written protest to any amendment issued by the University must be filed within the time limits set forth in Section 120.57(3)(b), Florida Statutes. (Emphasis added.) The instructions regarding the filing of bid protests in Supplement K supersede the instructions in Supplement J, which is dated February 13, 1996, and in the Instructions to Bidders in the Project Manual, which are dated October 16, 1989. Summary The evidence presented by Neel Mechanical is sufficient to establish that it timely filed its Notice of Intent to Protest and its Formal Written Protest and Petition for Formal Administrative Proceedings by hand-delivering the documents to Mr. Houston, at his office on the FAMU campus. The evidence presented by Neel Mechanical is not sufficient to establish with the requisite degree of certainty that FAMU acted fraudulently, arbitrarily, illegally, or dishonestly in deciding that it was in the best interest of FAMU to reject all of the bids submitted on May 11, 1999, for Project BR-389. First, FAMU's concerns that, by inadvertently including a technical specification that could be met by only one manufacturer, it had limited competition with respect to the chiller to be used in Project BR-389 and had inadvertently put out an illegal "sole source" specification were legitimate concerns. Mr. Houston instructed the engineer who prepared the technical specifications that he wanted the specifications drawn so that at least two manufacturers could provide the product, and the engineer prepared specifications relating to the "available manufacturers" which clearly contemplated that a chiller meeting the technical specifications could be provided by both York and Trane. FAMU did not act arbitrarily when it considered as one factor underlying the decision to reject all bids the lack of precedent in the State University System for waiving the requirement that the bid Proposal Form and Bid Bond carry the corporate seal of a corporate bidder. The evidence submitted by Neel Mechanical is not sufficient to establish with the requisite degree of certainty that the corporate seal issue was ultimately the only or even the major factor on which FAMU's decision to reject all bids was based. Mr. Houston identified the possibility that bid protests would be filed by York and by Bayou Mechanical as factors which FAMU considered in deciding to reject all bids. Nonetheless, the evidence taken as a whole permits the inference that the focus of the concern about the potential bid protests was not on avoiding the protests but on the validity of the issues raised by York and Bayou Mechanical. Accordingly, FAMU did not act arbitrarily when it considered these potential bid protests as one factor contributing to the decision to reject all bids. The evidence presented by Neel Mechanical is not sufficient to establish that the "Award of Contract" form executed by President Humphries on June 17, 1999, or Mr. Houston’s June 22, 1999, letter to Mr. Ogletree bound FAMU to award the contract to Neel Mechanical or that the subsequent decision to reject all bids defeated the purpose of the competitive bidding process.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that Florida Agricultural and Mechanical University enter a final order dismissing the Formal Written Protest and Petition for Formal Administrative Proceedings filed by Neel Mechanical Contractors, Inc., and denying Neel Mechanical's Motion for Assessment of Attorney's Fees, insofar as it is based on the provisions of Section 120.595, Florida Statutes. Based on the foregoing Findings of Fact and Conclusions of Law, Neel Mechanical's Motion for Assessment of Attorney's Fees, insofar as it is based on the provisions of Section 120.569(2)(e), Florida Statutes, is denied. DONE AND ENTERED this 12th day of November, 1999, in Tallahassee, Leon County, Florida. PATRICIA HART MALONO Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 12th day of November, 1999.
The Issue At issue in this proceeding is whether the Department of Environmental Protection's decision to reject all bids submitted for the project entitled BDRS 52-01/02 was illegal, arbitrary, dishonest, or fraudulent.
Findings Of Fact Parties Petitioner, All America Homes of Gainesville, Inc. (All America), is a corporation doing business in the State of Florida. All America submitted a timely written bid in response to the Department's ITB and filed timely protests to the Department's actions. The Respondent, the Department of Environmental Protection, is an agency of the State of Florida which manages and operates state parks under its jurisdiction, and solicits construction projects in state parks, pursuant to Chapter 258, Part I, Florida Statutes, through its Division of Recreation and Parks, Bureau of Design and Recreation Services. The ITB In November, 2001, the Department issued an ITB on a construction project entitled Hillsborough River State Park Concession Building, project number BDRS 52-01/02. The ITB included the Bid Specifications for the project. Bids were required to be submitted no later than 3:30 p.m. on Tuesday, December 18, 2001, at the Bureau's Tallahassee, Florida, office. The written Specifications define several terms, including, but not limited, to the following: ADDENDUM: A written explanation, interpretation, change, correction, addition, deletion, or modification, affecting the contract documents, including drawings and specifications issued by the OWNER [Department] and distributed to the prospective Bidders prior to the bid opening. ALTERNATE BID: Separate optional bid item for more or less project requirement used for tailoring project to available funding. Also may consist of alternate construction techniques. BASE BID: Formal bid exclusive of any alternate bids. BID FORM: The official form on which the OWNER requires formal bids to be prepared and submitted. ORAL STATEMENTS: Verbal instruction. NOTE: No oral statement of any person, whomever shall in any manner or degree modify or otherwise affect the provisions of the contract documents.[1] SEALED BID: The formal written offer of the Bidder for the proposed work when submitted on the prescribed bid form, properly signed and guaranteed. The Bid Specifications also contained the following relevant sections: Alternatives If the OWNER wishes to learn the relative or additional construction cost of an alternative method of construction, an alternative use of type of material or an increase or decrease in scope of the project, these items will be defined as alternates and will be specifically indicated and referenced to the drawings and specifications. Alternates will be listed in the bid form in such a manner that the Bidder shall be able to clearly indicate what sums he will add to (or deduct from) his Base Bid. The OWNER will judge for himself that such alternates are of comparable character and quality to the specified items. The Order of the alternate may be selected by the Department in any sequence so long as such acceptance out of order does not alter the designation of the low bidder. ADDENDA If the Consultant[2] finds it would be expedient to supplement, modify or interpret any portion of the bidding documents during the bidding period, such procedure will be accomplished by the issuance of written Addenda to the bidding documents which will be delivered or mailed by the OWNER'S Contracts section to all bidders who have requested bidding documents. Interpretation No interpretation of the meaning of the drawings, specifications or other bidding documents and no correction of any apparent ambiguity, inconsistency or error therein will be made to any Bidder orally. Every request for such interpretation or correction should be in writing, addressed to the Consultant. All such interpretations and supplemental instructions will be in the form of written Addenda to the bidding documents. Only the interpretation or correction so given by the Consultant in writing and approved by the OWNER shall be binding, and prospective Bidders are advised that no other source is authorized to give information concerning, or to explain or interpret, the bidding documents. B-16 Bid Modification Bid modification will be accepted from Bidders, if addressed as indicated in Advertisement for Bids and if received prior to the opening of bids. No bid modification will be accepted after the close of bidding has been announced. Modifications will only be accepted if addressed in written or printed form submitted with the bid in sealed envelopes. Telegrams, facsimiles, separate sealed envelopes, written on printed modifications on the outside of the sealed envelopes will not be accepted. All bid modifications must be signed by an authorized representative of the Bidder. Modification will be read by the OWNER at the opening of formal bids. B-21 Rejection of Bids The OWNER reserves the right to reject any and all bids when such rejection is in the interest of the State of Florida, and to reject the bid of a bidder who the OWNER determines is not in a position to perform the work. B-23 Award of Bid . . .The qualified Bidder submitting the lowest bid will be that Bidder who has submitted the lowest base bid plus any selected alternates. . . . The OWNER reserves the right to waive any minor irregularities in bids received when such waiver is in the interest of the OWNER. The Award of Bid will be issued by the OWNER only with responsible Bidders, found to meet all requirements for Award of Bid, qualified by experience and in a financial position to do the work specified. Each bidder shall, if so requested by the OWNER, present additional evidence of his experience, qualifications and ability to carry out the terms of the Agreement. (Emphasis in original, except for Section B-10.) The Bid Form is included with the Specifications and provides in part: Base Bid: Furnish labor, equipment, Lump Sum $ supervision and material to construct a new concession building of 2940 square feet located at the Hillsborough River State Park along with the alteration of the existing concession building according to plans and specifications. Alternate #1: Furnish labor, equipment, Add Amt.$__ supervision and material to renovate the existing concession building according to plans and specifications. There is a separate section for "Allowances," i.e., Section 01210, for the Hillsborough State Park. This section provides in part: SECTION 01210 – ALLOWANCES * * * 1.2 SUMMARY This Section includes administrative and procedural requirements governing allowances. Certain materials and equipment are specified in the Contract Documents and are defined by this [sic] specifications as material and labor to be provided against a pre-determined allowance. Allowances have been established in lieu of additional requirements and to defer selection of actual materials and equipment to a later date when additional information is available for evaluation. If necessary, additional requirements will be issued by Change Order. * * * 3.3 SCHEDULE OF ALLOWANCES A. Allowance #1: Include in the base bid an allowance for the purchase and installation of. . . kitchen equipment. . . . The total dollar amount of the allowance to be included shall be $12,000.00. There is also a separate section for "Alternates," i.e., section 01230, for Hillsborough River State Park, which provides in part: SECTION 01230 – ALTERNATES * * * 1.3 DEFINITIONS Alternate: An amount proposed by bidders and stated on the Bid Form for certain work defined in the Bidding Requirements that may be added to or deducted from the Base Bid amount if OWNER decides to accept a corresponding change either in the amount of construction to be completed or in the products, materials, equipment, systems, or installation methods described in the Contract Documents. The cost or credit for each alternate is the net addition to or deduction from the Contract Sum to incorporate alternate into the Work. No other adjustments are made to the Contract Sum. . . . . 3.1 SCHEDULE OF ALTERNATES A. Alternate No. 1: Renovate the existing concession building in its entirety as shown in the drawings and specified herein. (emphasis added.) At this stage of the bidding documents, the contractor/bidder is requested to provide a Base Bid/Lump Sum on the Bid Form to "[f]urnish labor, equipment,. . .to construct a new concession building," and to provide an additional and separate amount for Alternate No. 1 to "[f]urnish labor, equipment, . . . to renovate the existing concession building." On December 13, 2001, the Bureau issued "Addendum No. One (1)" (written by the architect) to the ITB on the "Hillsborough River State Park – Concession Building." The Addendum contained the following relevant sections: Specification Section 01210: Allowances Add the following new paragraph 3.3.B: ”Allowance #2: Include in the base bid an allowance for the renovations of the existing concession building; renovations shall be defined by the Owner. The total dollar amount of the allowance to be included shall be $25,000." Specification Section 01230: Alternates Modify paragraph 3.1.A. as follows: "Alternate No. 1: Renovate the existing concession building as defined by the Owner, and as provided for under Section 01210, Allowances." (emphasis added.) Each contractor was required to sign the Addendum and attach it to the bid. By definition, and pertinent here, an addendum is an additional written instruction to a contractor during the bidding process. Based on the weight of the evidence, the purpose of this Addendum was to require the contractor to include a $25,000.00 Allowance (for Allowance # 2) in the Base Bid, for the work which might be performed if the Department requested the work to be performed for Alternate No. 1, i.e., for the renovation of the existing concession building.3 (The Department's architect decided it would cost approximately $25,000.00 to renovate the existing concession building, hence Allowance # 2.) In other words, the Addendum does not have a specific dollar amount to be included for Alternate No. 1. Rather, the $25,000.00 is an Allowance for the work described as Alternate No. 1, but the amount is to be included in the Base Bid and not as a separate line item, dollar amount. But, importantly, the Addendum did not delete the potential work to be performed as described in Alternate No. 1, although Mr. Bowman and others believed that the Addendum deleted Alternate No. 1. It deleted the necessity to place a specific dollar amount on the Bid Form for Alternate No. 1. (Mr. Bowman is a registered Professional Engineer and a licensed contractor. He has worked for the Department for 15 years and has served as Bureau Chief for two years. He supervises the contract section and the design section, which was responsible for preparing the technical plans and specifications and bidding out the job.) Mr. Bowman offered the following explanation why he believed the Addendum was confusing: Okay. I think the confusion that was created, you know, I think the addendum in itself, you know, said add $25,000 to the base bid, but then on the bid form, it still had the space down there for alternate number one, which alternate number one, which alternate number one had become $25,000 that was to be allowed for the concession building, and I think that's where the confusion came in because I think they were still confused, that they weren't really sure that they should not put that 25 down there but they knew they had been told in the addendum to do it and I think that's the reason for the notes and we got to the correspondence on the bid form, was they wanted to make sure that that's what we were wanting to do. And I think that's where the confusion came in. Like I said, it's always, if you could go back and do it again, it would be much wiser just to issue a whole new bid form and then we wouldn't be here today. But, we didn't do that. Okay. So, that's why we are here. The language in this Addendum, when read with the original Bid Specifications, apparently caused confusion with some of the bidders on the project. Several bidders called Marvin Allen (an architect and project manager for the Department's Bureau of Design and Recreation Services) prior to the submission of the bids, to clarify how the $25,000.00 Allowance should be shown on the Bid Form. (Mr. Allen did not author any of the specifications, including the Addendum.) He was listed as a contact person. He did not contact any bidders. But, Mr. Allen recalled telling each bidder who asked that the Allowance of $25,000.00 should be included in the Base Bid. But, he does not recall the names or numbers of the bidders who called, "possibly" three, four or five. Mr. Allen believed the Addendum was clear. According to Mr. Allen, the bidders who called him found the Addendum confusing. The oral responses to the bidders can be construed as interpretations of the Addendum. However, pursuant to Section B- 10 of the Specifications, any such interpretations were required to "be in the form of written Addenda to the bidding documents." Also, any such questions should have been in writing. If Section B-10 were complied with, all bidders would have been potentially on the same footing, or, at the very least, would have had access to a written clarifying document. Opening of the Bids On December 18, 2001, the bids were opened by Mike Renard, Contracts Manager with the Bureau of Design and Recreation Services, and Susan Maynard, Administrative Assistant. Mr. Dwight Fitzpatrick, a representative of All America, also attended the bid opening. The Bid Form submitted by Nelco showed a Base Bid of $355,478.00 (Lump Sum $355,478.00), and also showed an amount of $25,000.00 on the Alternate # 1 line (Add Amt. $25,000.00). See Finding of Fact 6. (It was clear to Mr. Renard that the $25,000.00 should have been included on Nelco's Base Bid. But Mr. Renard believed that Nelco submitted a responsive bid because the Department only accepted the Base Bid. Mr. Bowman agreed.) Nelco was the only one of five bidders to have a dollar amount in the Alternate #1 line under "Add Amt. $ ." All America submitted the second lowest Base Bid of $362,000.00. There was also a hand-written note on the All- America Bid Form that stated: "Addenda # 1 instruction to place $25,000 allowance in both Base Bid and as alternate # 1." Another hand written note was located below the "Add Amt. $-0-" line: "amount added in Base Bid with $25,000 allowance per Marvin Allen." The Department considered All America's bid responsive. It is a fair inference that three out of five of the other Bid Forms contained language indicating that the bidders were relying on Addendum No. One by placing the $25,000.00 Allowance in the Base Bid.4 It is uncertain whether they did so in light of the instructions of Mr. Allen concerning how to complete the Bids Forms. However, given the nature of the calls to Mr. Allen, there is a reasonable inference that there was some confusion among some of the bidders. The Department determined that Nelco submitted the lowest Base Bid, but the Department's staff had a question as to whether Nelco had included the $25,000.00 in its Base Bid. After conferring with his superiors, Mr. Renard was instructed to call Nelco to make certain that its Base Bid included the Allowance amount ($25,000.00). Mr. Renard spoke with Steve Cleveland, Nelco's Project Manager, "to verify the fact that [Nelco] had the allowance in their base bid." Mr. Cleveland orally confirmed that Nelco's Base Bid included the $25,000.00 Allowance. Mr. Renard asked Mr. Cleveland to send him a letter verifying this statement. Mr. Renard viewed this inquiry as a request for clarification or verification, not an opportunity for Nelco to modify its bid. Mr. Bowman agreed. (Mr. Renard did not believe Addendum No. 1 was confusing.) In a letter dated December 20, 2001, Mr. Cleveland confirmed that Nelco’s Base Bid of $355,478.00 included the Allowance amount and that Nelco could still perform the contract if the $25,000 Allowance was removed from its Base Bid pursuant to the ITB, i.e., that Nelco would perform the contract for $355,478.00 less $25,000.00, or $330,478.00, if the Department did not accept Alternate # 1 and the Allowance. (An alternate does not have to be accepted by the Department.) According to Mr. Renard, Mr. Cleveland never mentioned modifying, changing, or altering Nelco's bid. The Department only accepted the Base Bid for each bid. Mr. Renard did not consider it unusual to call a bidder or contractor to verify information to determine whether they can or cannot perform the work at the stipulated price. He considered it common to make this inquiry. Also, it was common in Mr. Bowman's experience to call a bidder to get clarification. Mr. Renard was not aware of any statute or rule which authorizes the Department to request clarification from a bidder after the bids are opened. Mr. Renard was more familiar with the bid forms than Mr. Allen. After receiving Mr. Cleveland's letter, the Department determined that Nelco submitted the lowest Base Bid and that the $25,000.00 amount that Nelco wrote on the Bid Form Alternate # 1 line, was a minor irregularity in the bid which the Department, as the Owner, could waive pursuant to the ITB. On December 20, 2001, the Department posted the Tabulation of Bids showing the anticipated award of the contract to Nelco. At the hearing, an unsigned letter on Department letterhead was introduced, which was addressed to Nelco and stated that Nelco submitted the apparent low bid. However, Mr. Renard testified that these letters are prepared routinely, but not mailed out without his signature. Mr. Renard did not recall signing the letter or ever sending out such a letter to Nelco. On December 21, 2001, the Department received a Notice of Intent to Protest letter from Allen E. Stine, the President of All America. In his letter, Mr. Stine stated that Nelco’s bid should have been rejected for failure to follow the specified format as per Addendum No. 1, or adjusted to have the $25,000.00 amount added to their Base Bid. Bid Protests All America filed a written formal bid protest on January 4, 2001. On January 9, 2001, Cindy Otero of All America, notified Mr. Renard by letter, and stated that Mr. Stine was available for a hearing regarding the bid protest. On January 28, 2002, Mr. Renard returned All America's check for the bond, stating that it was unnecessary. Mr. Stine recounted a number of unanswered telephone calls after the first protest was filed. During one conversation, Mr. Renard recalled Mr. Stine saying to him, "You can't do this, you can't do this." After receiving the first formal protest, the Department staff consulted with legal staff and reviewed the documents and bid procedures. Based on the number of questions received concerning the Addendum and the hand-written notes on several of the bid forms, Mr. Bowman, Bureau Chief, determined that the bid documents were confusing and ambiguous. (Mr. Bowman stated that this was their first bid protest in his 15 years with the Department.) Therefore, Mr. Bowman decided that it would in the best interest of the State of Florida to reject all of the bids pursuant to the Bid Specifications. Mr. Bowman felt that the ITB should be re-written in order to make it clearer and allowing all of the bidders to re-bid the project without any confusion or ambiguity. Mr. Stine stated that his "senior estimator" told him that the bid language "could be confusing." He and his "senior estimator" had a discussion about whether the Allowance should have been placed in the Base Bid or not. At the time of submission of All America's bid, Mr. Stine was clear that the Allowance should be placed in the Base Bid, especially after calling Mr. Allen. But, his senior estimator was not so clear. In order to appease him, Mr. Stine placed the hand-written note on All America’s proposal. Mr. Stine essentially, "cleaned" up his proposal. At the hearing, Mr. Bowman testified Rule 60D-5.0071, Florida Administrative Code, see Conclusion of Law 59, does not list "confusing or ambiguous bid specifications" as one of the circumstances allowing for the rejection of all bids. However, Mr. Bowman later stated during the hearing that he believed the circumstances listed in Rule 60D-5.0071 were not the only circumstances authorizing the Department to reject all bids. Mr. Bowman testified that he believed that general confusion among the bidders caused by the ambiguous ITB constituted sufficient grounds for rejecting all bids. Mr. Bowman was advised by legal counsel that rejecting all of the bids would probably result in another bid protest by Nelco, All America, or both. Thus, the Department decided to delay addressing All American’s first protest until after posting the rejection of all bids and receiving the subsequent protests, so that all of the protests could be resolved at once in an efficient and economical manner. Notwithstanding the Department's justifications for rejecting all bids and not proceeding on All America's initial protest, the record is unclear why the Department waited several months to reject all bids. On May 13, 2002, the Department posted the rejection of all bids. On May 16, 2002, the Department received a formal written protest of the rejection of all bids filed by All America. On May 17, 2002, Jerome I. Johnson, attorney for the Department, contacted Mr. Robert A. Lash, All America's counsel at the time, concerning the resolution of All America’s formal protest. (Before the final hearing, Mr. Lash, with All America's consent, withdrew as counsel for All America.) The parties agreed to suspend formal bid protest procedures until a meeting could be held between the parties in an attempt to resolve the protests. Mr. Johnson sent a letter dated May 21, 2002, to Mr. Lash confirming this conversation. On June 26, 2002, a meeting was held among the Department staff, legal staff, and Mr. Lash and Mr. Stine, representing All America. The parties were unable to resolve the protests. At the conclusion of the meeting, the parties agreed that formal protest procedures would not be implemented until Mr. Stine could confer further with his counsel. In a letter dated July 5, 2002, Mr. Lash stated that his client wished to proceed with formal protest procedures and requested an administrative hearing on the protests. Are the Specifications and Bid Documents Ambiguous and Was There Confusion? The parties stipulated that "[t]he Addendum language was confusing," notwithstanding the testimony of several witnesses that they were not confused. The Department's determination that the bid Specifications, including the Addendum, and the Bid Form, which remained unchanged after the Addendum was issued, were confusing and ambiguous, is supported by the weight of the evidence. This is particularly true regarding the Bid Form. The Addendum required the bidder to include an Allowance of $25,000.00 in the Base Bid for work described as Alternate # 1. But the Bid Form was unchanged to reflect the Addendum changes. The Bid Form retained a line for the bidder to submit an additional amount for Alternate # 1. Further, it appears that several bidders were confused, including, Mr. Stine, who spoke with Mr. Allen and requested and received clarification. Further, it is unclear whether all of the bidders, including Nelco, were aware of the oral interpretations or clarifications of the Addendum rendered to some of the bidders. Rejection of All Bids Based upon the foregoing, given the standard of review in this proceeding discussed in the Conclusions of Law, the weight of the evidence indicates that the Department's action, in rejecting all bids, was not illegal, arbitrary, dishonest, or fraudulent. The Department's staff was well-intended and made some mistakes along the way, e.g., by not changing the Bid Form, which they readily admit. But there was a rationale for rejecting all bids under the circumstances.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is recommended that the Department issue a final order dismissing All America’s Petition to Prevent Rejection of Bids and Award Contract to Petitioner and denying All America's request for attorney’s fees and costs. DONE AND ENTERED this 24th day of September 2002, in Tallahassee, Leon County, Florida. CHARLES A. STAMPELOS Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 24th day of September 2002.
The Issue The issue in this case is whether the bid protest of Petitioner should be sustained.
Findings Of Fact Respondent owns and operates a city pool known as the George A. Pierce Swimming Pool at the Ferran Park complex in Eustis. The pool is nearly 40 years old and is in need of renovations and repairs. Deciding to renovate the old pool and build a new one next to it, Respondent obtained plans for the intended work from Project Engineering. These plans, which are dated January 31, 1990, consist of seven pages of blue-line drawings of the site, the existing pool, a new training pool, and various details, such as gutters (Blue Drawings). The Blue Drawings formed the basis of a request for proposals that Respondent issued at some point prior to the events at issue in the present case. The offers submitted in response to the request for proposals were unsuitable because they exceeded the money that Respondent had available for the job. At this point, employees of Petitioner learned that Respondent was seeking to repair and renovate the pool. Bill West, who is responsible for sales for Petitioner, visited with Norma Showley, who is in charge of purchasing for Respondent. She showed him the Blue Drawings and informed him that the proposals that had been submitted were double the budget. Mr. West agreed, at no charge, to prepare a new set of drawings for Respondent. Ms. Showley did not agree that Petitioner's drawings would necessarily be incorporated into a new request for proposals or invitation to bid. However, Ms. Showley explained that time was critical, and she needed his drawings in a hurry. She gave Mr. West the original set of Blue Drawings for his company to use in preparing the new drawings. Mr. West asked Jack Arthur to prepare the new drawings. Mr. Arthur does estimates and drawings for Petitioner and is a registered professional engineer licensed to practice in Florida and several other states. He is also a Florida-licensed commercial pool contractor. Mr. Arthur met with Ms. Showley a few days prior to March 12, 1990. Also attending this meeting was Harvey Spears, who, although not an employee of Respondent, assisted Ms. Showley on this project. Apparently, Mr. Spears was the contractor in charge of other work in the pool area, such as the construction of a bathhouse. Working 40-50 hours over the next three days, Mr. Arthur finished the plans, which bear the date of March 12, 1990 (Black and White Drawings). Mr. West then delivered the plans to Ms. Showley. Ms. Showley discussed with the City Comission the possibility of using the Black and White Drawings instead of the Blue Drawings as the basis of a new bid solicitation. The Commission directed her not to abandon the specifications contained in the Blue Drawings, but revise them as appropriate. No decision was ever made to use the Black and White Drawings, except for the purposes expressly indicated in the later-issued invitation to bid, such as to indicate the location of the bathhouse relative to the existing pool and the details of an alternate gutter system. On April 13, 1990, Respondent issued an invitation to bid, which was identified as Bid NO. 026-90. The invitation to bid was accompanied by the Blue Drawings and the Black and White Drawings. The text, Blue Drawings, and Black and White Drawings are collectively referred to as the "ITB." Each of the pages of the Black and White Drawings were marked "Attachment `A,' `B,' `C,' or `D."' The ITB required that the bids, which had to be sealed, were to be delivered to a certain place, where they would be opened at a specified time on May 14, 1990. The ITB provided for a "bid evaluation period" of up to 30 days after opening. Other relevant provisions in the unlabelled introductory section of the ITB include: ACCEPTABLE FORMAT--Bid format provided by "the City is the only acceptable format on which a bidder may return his bid. Bids submitted, on any other format shall be disqualified. (Any additional information relative to the bid, should be submitted on a separate format.) * * * CLARIFICATION/CORRECTION OF BID ENTRY--The City of Eustis reserves the right to allow for the clarification of questionable entries and for the correction of obvious mistakes. ADDITIONAL TERMS AND CONDITIONS--The City of Eustis reserves the right to reject bids containing any additional terms or conditions not specifically requested in the bid/proposal solicitation. * * * AWARD--This bid may be awarded in part or whole as best serves the interest of the City. All awards made as a result of this bid shall conform to all applicable ordinances of the City of Eustis. RESERVATION--The City of Eustis reserves the right to accept any bid which in its opinion best serves the interest of the City, and/or to reject any or all bids or any part thereof, to make awards by individual items, groups of items, or a combination thereof, or to waive minor technicalities or informalities in bids received. * * * For information regarding bid specification, contact Norma M. Showley, General Services, Coordinator [telephone number provided in ITB]. The Scope section of the ITB provides that this is a bid to provide all labor, materials, equipment, supplies and incidental necessary for the performance of all work required for the proper and professional renovation of the existing City Pool with an additive alternate for addition of a . . . training pool . . . The following are suggested methods of renovating the existing pool and constructing the new pool. Plans that differ will be considered for award if determined to be in the best interest of the City. The Scope section explains that the existing pool was built in 1951 and is a "poured-in place pool . . . with no flood inlets." This part of the ITB also informs the bidder that separate contracts have been executed for the construction of a new bathhouse, including a new chemical and filter room, and the work may be performed concurrently with the renovation of the existing pool. The bathhouse layout is shown on Attachment "A". NOTE: Funding for this project is from sales surtax which must be used for construction purposes and must be fully expended before the end of October, 1990. The Scope section continues with a description of the base bid and alternates. The alternates are provided "[d]ue to the time restraint involved with the funding for this project" and Respondent's desire to complete the project quickly. The Scope section of the ITB states that the base bid for the renovation of the existing pool includes replacement of the filtering system with a D.E. filter system, replacement of the circulation system, replacement of the existing guttering system with a one foot open face overflow gutter, replacement of the Marcite on the walls, and addition of underwater lighting "as per plans prepared by Project Engineering (i.e., the Blue Drawings). Additive Alternate 1 eliminates the overflow gutter system and adds a stainless steel facing overflow system as shown on Attachment "B." Additive Alternate B eliminates the recirculating system shown in the Blue Drawings and provides for a proprietary system manufactured by Petitioner. Additive Alternate 3 eliminates the D.E. filter system, as shown in the Blue Drawings, and adds a high rate vacuum sand filter system. Deductive Alternate 1 eliminates the underwater lighting. The Scope section of the ITB describes the base bid for the new pool, which in fact is not an additive alternate, as located west of the existing pool and having a D.E. filter system and underwater lighting. Additive Alternate 1 eliminates the D.E. filter system and adds a pressure sand filter system. Deductive Alternate 1 eliminates underwater lighting. The next section of the ITB is the Instructions to Bidders. Among the provisions listed under the "Submittals" subsection are: License--Bidders shall submit with the bid response a copy of their license from the State of Florida Construction Industry Licensing Board. * * * Bidder Qualification-- * * * References shall be furnished with bid response Other relevant subsections of the Instructions to Bidders section of the ITB provide: Visit to Site--The bidder/contractor shall visit the site of the work to become fully informed as to the conditions that exist and under which he/she must work, and by bidding, represents that he/she has read and understands the bid documents. * * * Evaluation and Award--Bids will be evaluated on the basis of cost, bidder's ability to perform, previous experience, experience of personnel and required completion time. It is the City's intent to award a contract to the lowest responsive bidder. However, the City of Eustis reserves the right to accept any bid which in its opinion best serves the interest of the City, and/or to reject any or all bids or any part thereof, to make awards by individual items, groups of items, or a combination thereof, or to waive technicalities or informalities in bids received. NOTE: Funding for this project is from sales surtax which must be used for construction purposes and must be fully expended before the end of October, 1990. Negotiation of Contract--If deemed in the best interest of the City, the City may, either before or after receipt of bids, select one or more persons or companies and negotiate a contract for the proposed work. The decision of the City as to the firm or firms with whom the City will negotiate will be final. During the negotiations, the right is also reserved to change the plans and specifications as the City may at that time determine to be in the best interest of the City. The section of the ITB devoted to Requirements and Specifications restates the base bids and alternates set forth above in the Scope section. Under the subsection entitled, "Work and Products Not Included," the ITB lists, among other items, "Concrete decking--bleacher area, bathhouse area." Under the subsection entitled, "Description of Work--Existing Pool," the ITB includes the demolition necessary to remove the existing overflow system, install a new one, and provide a recirculation system. Under a similar subsection for the new pool the ITB provides: Provide decking around new pool to match height of existing decking, 4" thickness, 3000 psi concrete, as shown on attachment showing pool layout. Decking shall slope three inches (3") in ten feet (10') away from pool or to deck drains. Minimum unobstructed deck width shall befour [sic] feet (4'). This subsection also refers the bidder to the Black and White Drawings for the curing of the floor of the new pool. For the renovation of the existing pool, the bid form contains blanks for the bidder to include prices for the base bid, three additive alternates, and one deductive alternate. For the construction of the new pool, the bid form contains blanks for the bidder to include prices for the base bid, one additive alternate, and one deductive alternate. Two bid addenda were issued. The first concerned additive alternate 3 for the existing pool and additive alternate 1 for the new pool. This addendum adds, respectively, a vacuum sand filter (instead of a high rate vacuum sand filter) and a high rate pressure sand filter system (instead of a pressure sand filter system). The second addendum, which was accompanied by "a new bid form for prices, adds an automatic water level sensor unit, as described in the Black and White Drawings, to the base bids for the existing and new pools. For the existing pool, the addendum added alternate 4, which replaces the existing main drain with a stainless steel drain, as described in the Black and White Drawings. The Blue Drawings contain four special notes and ten general notes. The first special note is that the final location of "pool and configuration of deck to be determined by architect." The first general note is that the bathroom floors, pool deck, and first 15 feet of connecting walkway are to be concrete or other impervious material, positively drained, and slip resistant. Three unrelated items are noted in red handwriting to be "in bathhouse contract," and one unrelated item is similarly noted to be "by City." Notes on the Black and White Drawings indicate that the contract does not include pool decking around the new pool and a retaining wall beside the new pool, which is in close proximity to a lake. The new pool clearly has to be built to the elevation of the existing pool because, among other reasons, the lake contributes to a high water table in the area of the pool. In order to achieve this elevation, the construction of the decking around the new pool would require either a retaining wall (with some fill) or a larger amount of fill sloped down to the ground level. Due to the close proximity of the lake, it is not entirely clear that the latter approach would work. Even though Mr. Arthur detected inconsistencies between the Black and White Plans and the remainder of the ITB, neither he, Mr. West, nor any other representative of Petitioner contacted Ms. Showley regarding the decking and retaining wall. Following the issuance of the ITB but before the submission of bids, Mr. West met with Ms. Showley, but the conversation involved only the replacement of the main drain and installation of the automatic water level sensor unit. Ms. Showley covered these matters by the addenda described above. They also discussed the possibility of alternate bids with one based exclusively on the Blue Drawings and one based exclusively on the Black and White Drawings. However, Ms. Showley's ability to deviate significantly from the specifications depicted in the Blue Drawings was limited by the lack of time and the earlier directive of the City Commission to revise, rather than abandon, the specifications in the Blue Drawings. Ultimately, timely bids were submitted by only Petitioner and Intervenor, ignoring one or two "no-bid" bids. Petitioner's base bid for the existing pool was $92,399. Additive alternate 1 added $22,897. Additive alternate 2 added $12,383. Additive alternate 3 added $18,500. Additive alternate 4, which was the replacement of the main drain, was included in the base bid and all alternates, even though the only alternate specifying that the main drain be replaced was Additive alternate In fact and as evident from the bid, Petitioner would not perform the job without replacing the main drain due to concerns about the durability of the existing main drain. Deductive alternate 1 subtracted $2500. For the new pool, the base bid was $38,389. Additive alternate 1 subtracted $3103. Deductive alternate 1 subtracted $798. Intervenor's base bid for the existing pool was $107,170. Additive alternate 1 was not bid. Additive alternate 2 added $25,601. The bid was apparently incorrectly filled out. Additive alternate 2, which was the proprietary system manufactured by Petitioner, in fact was not bid, and Additive alternate 1 was bid. Additive alternate 3 added $22 927. Additive alternate 4, which called for the replacement of the main drain, added $5340, but Intervenor noted on its bid form that it did not recommend this alternative. Deductive alternate 1 subtracted $3444. Intervenor's based bid for the new pool was $50,472. Additive alternate 1 was not bid. Deductive alternate 1 subtracted $920. Intervenor also bid three "Voluntary alternates." These alternates, which were not requested in the ITB, involved variations on equipment for the existing pool. Voluntary alternate 2, which totalled $143,253, included a full stainless steel gutter with grating and a high rate pressure sand filter with automatic backwashing feature. Petitioner's base bid for both pools was $130,788. Intervenor's base bid for both pools was $157,642. Intervenor's base bid for both pools, using Voluntary alternate 2, was $193,725. Both bid packages disclosed obvious problems. Petitioner had not bid on any decking or the retaining wall and fill. Ms. Showley and Mr. Spears called Mr. West and, after confirming these omissions, asked for a price. The additional labor and materials added $13,526 for the decking and fill, but apparently not the retaining wall as the slope approach would be used around the new pool. This would have raised Petitioner's base bid to $144,314. However, Petitioner still did not address the issue of the replacement of the main drain. Based on advice from Mr. Spears, Respondent did not want to replace the main drain. The process would require cutting the bottom of the pool. Due to the pool's location, age, and type (poured-in), Mr. spears felt, and Respondent agreed, that the main drain should not be disturbed. Intervenor's bid did not include a copy of its contractor's license or references. Ms. Showley obtained this information after the bid opening. She and Mr. Spears also spoke with Harold von Weller, owner and president of Intervenor, concerning the filtration and gutter systems described in Voluntary alternate 1 and where they had been used. In response to a question concerning the 2 approximate cost of the retaining wall and decking, for the purpose of making a deduction that would facilitate comparison with Petitioner's bid, Mr. Weller wrote a letter estimating the cost of these items as $7004.43. An informal committee consisting of Mr. Spears, Ms. Showley, the architect for the bathhouse, and the City Manager, Michael G. Steerman, considered the bids and determined, after consulting with staff, that Petitioner's bid was not responsive. The City Commission met on May 17, 1990, to award a contract for the renovation and construction of the pools. Mr. Steerman recommended that Respondent reject Petitioner's bid as nonresponsive and award the contract to Intervenor on its Voluntary alternate 2 bid for the existing pool and its base bid for the new pool less the Deductive alternate 1. The amount of $189,361 was derived by subtracting from the Voluntary alternate 2 amount of $143,253 the sum of $3444 for Deductive alternate 1, for a net amount of $139,809 for the existing pool. The new pool net of $49,552 thus generated a total figure of $189,361. It is not entirely clear whether Respondent viewed any of Intervenor's bids as responsive. Most likely, it was assumed by staff and the City Commission that the base bid and possibly the Voluntary alternate 2 bid were responsive. Petitioner and Intervenor are responsible bidders. They are highly qualified and experienced in the construction of commercial pools.
Recommendation Based on the foregoing, it is hereby RECOMMENDED that the City of Eustis enter a final order dismissing the bid protest of Petitioner. ENTERED this 18th day of July, 1990, in Tallahassee, Florida. ROBERT D. MEALE Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 Filed with the Clerk of the Division of Administrative Hearings this 18th day of July, 1990.
The Issue The issues in this bid protest proceeding are whether the bid of Professional Leasing & Development Corporation on state project, job number 48020-3543, was properly rejected for failure to prequalify to bid on the project; and whether the Department properly rejected the bid failure to: meet disadvantaged business enterprise ("DBE") requirements in soliciting minority subcontractors to work on the project, or make a good faith effort to meet the DBE goals set for this project?
Findings Of Fact Professional Leasing & Development Corporation ("Professional") filed a bid on state project, job number 4802 0-3543, which was opened on January 22, 1986 for work on an intersection in Escambia County. The only other bidder was Edward M. Chadbourne, Inc., which the Department declared the lowest responsible bidder, and which declined to participate in these proceedings after notice. The parties stipulated at the hearing that the bids submitted by both bidders were in due form and were submitted in a timely fashion. The parties also stipulated that the Department posted its bid tabulation on March 3, 1986, designating Chadbourne as the lowest responsible bidder, and a timely protest was filed by Professional following that posting. This job is the first Department of Transportation job on which Professional has submitted a bid. It had not prequalified to bid on the job. Warnings appear on pages one and seven of the bid blank that if the bid amount is greater than $150,000, the contractor must be prequalified. The bid blank clearly states in large print on page 7 that if the contractor is not prequalified and the bid is in excess of $150,000, the bid will be rejected. The bid package submitted by Professional was for a total contract amount of $149,973.68. This amount contained errors in the prices for certain items in the bid. These resulted from Professional's errors in the extension of the unit price for items 300 1 3, tack coat; 5331 2, type s asphaltic concrete; and 5337 1 5, asphaltic concrete friction course. The errors are small, aggregating $76.32. The total amount of the bid, as corrected by the unit prices given by Professional in its bid blank, is $150,050. The bid was rejected by the Department for failure to prequalify. When preparing its bid, Professional made efforts to meet the DBE goal set by the Department of Transportation of 8 percent of the contract amount. It sought bids from two minority businesses for striping, and for guardrail and paved ditches,the second of which was a bid from a women's business enterprise which is not considered in meeting the DBE goal. Additional efforts might have been made to obtain DBE subcontract bids by the other principal in the corporation, William Stubstad, but the testimony at the final hearing did not indicate what those efforts may have been. Neither are they reflected in the bid documents. On the DBE/WBE utilization form number 1 submitted with the bid, Professional listed eight potential subcontractors; the striping subcontractor had been certified by the Department of Transportation as a DBE. Written by hand at the bottom of the form was the statement "no other local DBEs in area." Professional's bid reflected only a 3.2 percent utilization of DBE subcontractors, while the goal set by the Department was 8 percent of the contract amount. Based on this submittal, the Department found inadequate documentation of a good faith effort to meet the DBE goal and rejected the bid. Many other subcontractors are certified as DBEs by the Department for work such as signs, guardrails, landscaping and paved ditches. Professional's bid documents give no evidence that these other firms had been solicited to submit bids.
Recommendation It is recommended that the protest of Professional Leasing and Development Corporation be rejected, and the contract be awarded to Edward M. Chadbourne, Inc. DONE AND ORDERED this 2nd day of April 1986 in Tallahassee, Leon County, Florida. WILLIAM R. DORSEY, JR. Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 2nd day of April, 1986. APPENDIX TO THE RECOMMENDED ORDER IN CASE NO. 86-0788BID The following constitute my specific rulings pursuant to Section 120.59(2), Florida Statutes (1985) on the proposed findings of fact submitted by the parties. Rulings on Proposed Findings of Fact Submitted by Petitioner: No proposed findings of fact were submitted. Rulings on Proposed Findings of Fact Submitted by Respondent: Covered in Findings of Fact 1 and 5. First sentence is covered in Findings of Fact 3 and 5; the remainder of the proposed finding is covered in Conclusion of Law 1. Generally covered in Finding of Fact 4. The portion of the proposal dealing with Standard Specifi- cation 2-1, 1986 Edition, is rejected because that section was not placed in evidence at the hearing, nor was leave requested to file that specification after the hearing. Covered in Finding of Fact 5. Covered generally in Conclusions of Law 2 and 3. Covered in Conclusion of Law 6. Rejected on the grounds that Section 2-5.3.2 of the Supplemental Special Provision of the Bid Specifications was not proven at the final hearing, nor was leave requested to file them as an exhibit after the hearing. Covered in Finding of Fact 7. Covered in Finding of Fact 7. The portion of proposal 10 found on page 4 is covered in Finding of Fact 7; the remainder is rejected as cumulative. Covered in Finding of Fact 7. Rejected because there is no evidence in the record concerning the consistency with which the Department requires full compliance with DBE goals, and because no issue was raised in this proceeding by Professional with respect to inconsistency in Department policy, making the finding irrelevant. COPIES FURNISHED: Thomas E. Drawdy Secretary Department of Transportation Hayden Burns Building Tallahassee, Florida 32301 A. J. Spalla, Esquire General Counsel Department of Transportation Hayden Burns Building Tallahassee, Florida 32301 Larry D. Scott, Esquire Department of Transportation Hayden Burns Building Tallahassee, Florida 32301 Harold Pridgen President Professional Leasing & Development Corp. 25 East Nine Mile Road Pensacola, Florida 32514 Edward M. Chadbourne, Inc. 4375 McCoy Drive Pensacola, Florida 32503
The Issue The issue is whether Kelly Services is the lowest responsive bidder on Bid No. 89-23 and should be awarded the bid.
Findings Of Fact On June 2, 1988, the School Board of Bay County issued Bid Request No. 89-23 for garbage collection services at thirteen locations. A quotation sheet was included in the bid package. The quotation sheet indicated the thirteen locations with a blank next to each location and a dollar sign in front of each blank where each bidder was to indicate its average monthly total charge for each location. There was also a quotation schedule where the bidder was to indicate the calculations which went into the total bid for each location. The bid request provided: The Board reserves the right to waive formalities and to reject any and all bids or to accept any bid or combination of bids deemed in the Board's best interest and the decision of the Board will be final. Bidders desiring that their bid be considered on an all-or-none basis, either in whole or part, shall so indicate. It is the intent of this bid request to secure prices and establish contracts for garbage collection services for the twelve schools specified herein and the District Maintenance Department. Awards will be made by location and will be based on an average monthly total charge as calculated on the quotation sheet. The bids were opened at 10:00 am., June 13, 1988, at the offices of the Bay County School Board. Three completed bid packages were submitted. Kelly Services, Argus and M&O each submitted a completed bid quotation sheet containing the bid for each location. M&O also submitted a letter which stated: We would like to submit this bid on an all- or-nothing basis as specified in paragraph four of the cover letter to the bid. For an estimated cost of $3,391.84. The quotation sheet and quotation schedule submitted by M&O did not reflect the all-or-nothing bid amount. Instead, the quotation sheet and quotation schedule showed a total bid of $3,738.24 when calculated by location. Based on the bids submitted by each bidder as shown on the quotation sheet add quotation schedules, Kelly Services was low bidder on five locations (Callaway, Tyndall, Waller, Southport, and Cedar Grove) ; Argus was low bidder on six locations (Parker, Hiland, Haney, Mosley, Beach and Merritt Brown); and M&O was low bidder on two locations (West Bay and the District Maintenance Department). Prior to the deadline for submitting bids, John Harrison, Purchasing Agent for the Board, responded to an inquiry from M&O by advising M&O that it could submit two bids, one as specified in the Bid Request by location and one as an all-or- nothing bid. No other bidders were advised that they could submit two bids. At the bid opening, M&O did not submit a quotation sheet or schedule for its all-or-nothing bid. A bid which did not have a breakdown per dump per container per facility would not be acceptable to the Board and does not meet the specifications in the Bid Request. The breakdown per dump per container per location is necessary to verify proper invoicing for specific locations on months when there is a change in the number of dumps or containers at that location. After opening the bids, the Board compiled the low bid for each location and then totaled that list. That total of $3,606.09 was greater than the all-or-nothing bid by M&O. Because M&O's all-or-nothing bid failed to meet the specifications by not having a location breakdown the Board contacted M&O to determine if its "estimated" bid was firm and to request a breakdown on the quotation schedule form for the all- or-nothing bid. On June 15, 1988, two days after the bid opening, M&O submitted a letter to the Board clarifying that its all-or- nothing bid was a firm bid for each location and M&O submitted a quotation schedule for each location per dump per container (see page 7 of Joint Exhibit 1 and the last page of Joint Exhibit 2). The charge for each location in this quotation schedule is different than the quotation schedule submitted by M&O at the bid opening and is for the most part lower per location than either M&O's first quotation schedule or the low bids taken from the quotation schedules submitted at the bid opening. Based on the letter and all-or-nothing quotation schedule filed by M&O on June 15, 1988, the Board determined to award the bid for garbage collection services to M&O for the all- or-nothing bid of $3,391.84.
Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law it is RECOMMENDED that The School Board of Bay County enter a Final Order rejecting all bids and readvertising the bid request for garbage collection services as specified in Bid Request No. 89-23. DONE and ENTERED this 13th day of September, 1988, in Tallahassee, Florida. DIANE K. KIESLING Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 13th day of September, 1988. APPENDIX TO THE RECOMMENDED ORDER IN CASE NO. 88-3768BID The following constitutes my specific rulings pursuant to Section 120.59(2), Florida Statutes, on the proposed findings of fact submitted by the parties in this case. Specific Rulings on Proposed Findings of Fact Submitted by Petitioner, Kelly Services: 1. Each of the following proposed findings of fact are adopted in substance as modified in the Recommended Order. The number in parentheses is the Finding of Fact which so adopts the proposed finding of fact: 1-3(1-3); 4-6(3); 7-11(7-11); and 12 (9) Specific Rulings on Proposed Findings of Fact Submitted by Respondent, School Board of Bay County: Each of the following proposed findings of fact are adopted in substance as modified in the Recommended Order. The number in parentheses is the Finding of Fact which so adopts the proposed finding of fact: 1(2); 3(10&11); and 5(8). Proposed findings of fact 6, 7, and 9 are irrelevant. The first sentence of proposed finding of fact 2 is unsupported by the competent, substantial evidence. The remainder of proposed finding of fact 2 is adopted in substance as modified in Finding of Fact 3. Proposed finding of fact 4 is rejected as being unsupported by the competent, substantial evidence. The last sentence of proposed finding of fact 5 is rejected as being argumentative, conclusory and unsupported by the competent, substantial evidence. Proposed finding of fact 8 is unnecessary. Specific Rulings on Proposed Findings of Fact Submitted by Intervenor, Argus Services, Inc.: Each of the following proposed findings of fact are adopted in substance as modified in the Recommended Order. The number in parentheses is the Finding of Fact which so adopts the proposed finding of fact: 2-4(1-3); 6-8(5); 9 & 10(6) 11(3); and 12(11). Proposed findings of fact 1 and 5 are unnecessary. Proposed findings of fact 13-17 are rejected as constituting argument and not findings of fact. COPIES FURNISHED: Jeffrey P. Whitton Attorney at Law Post Office Box 1956 Panama City, Florida 32402 Franklin R. Harrison Attorney at Law 304 Magnolia Avenue Panama City, Florida 32401 Scott W. Clemons Attorney at Law Post Office Box 860 Panama City, Florida 32402 School Board of Bay County Post Office Drawer 820 Panama City, Florida 32402-0820 M&O Sanitation, Inc. 266 N. Star Avenue Panama City, Florida 32404