CONSTRUCTION INDUSTRY LICENSING BOARD vs. DAMIAN C. DAVIS, 83-001230 (1983)
Division of Administrative Hearings, Florida Number: 83-001230 Latest Update: Sep. 22, 1983

The Issue The issues presented are as follow: Did the Respondent allow his registration to be used by an unlicensed and unregistered person to evade the provisions of Chapter 489, Florida Statutes? Did the Respondent combine and conspire to allow his registration to be used by an unlicensed or unregistered person to evade the provisions of Chapter 489, Florida Statutes? Did the Respondent engage in contracting in a name other than set forth on his certificate? Did the Respondent engage in contracting in a name of a business entity without first qualifying that business entity with the Construction Industry Licensing Board? The parties submitted post hearing findings of fact in the form of a proposed recommended order and correspondence. To the extent that the proposed findings of fact have not been included in the factual findings in this order, they are specifically rejected as being irrelevant, not being based upon the most credible evidence, or not being a finding of fact.

Findings Of Fact The Respondent, Damian C. Davis, is a certified general contractor holding license number CG C007059 issued by the Construction Industry Licensing Board through the Department of Professional Regulation. On or about August 29, 1980, the Respondent obtained building permit number B 45383 from the City of Tampa Building Department for construction to be performed by George Lacey at 910 East Osborne Street, Tampa, Florida, the residence of Martha Smith George Lacey was at that time uncertified and unregistered and was the contractor in fact on the work to be done for Martha Smith at 910 East Osborne Street in Tampa. The Respondent arranged for all building inspections by inspectors of the City of Tampa and was on the building site when said inspections were conducted. All work was approved by building inspectors of the City of Tampa, and there were no code problems. Subsequent to the completion of the work by Lacey, the owner had a problem with a leak over a sliding glass door which Lacey had contracted to repair. When this matter was brought to the Respondent's attention by officials of the Tampa Building Department, the Respondent fixed the leak to the owner's complete satisfaction. The building permit obtained by the Respondent was issued in the Respondent's name. All work the Respondent performed was done in the Respondent's name. The Respondent and Lacey frequently worked together in joint ventures; however, this was not such a project.

Recommendation Having found the Respondent, Damian C. Davis, guilty of one count (one offense) of violating Sections 489.129(1)(e) and (f), Florida Statutes, and considering the Respondent's prompt action to satisfy the owner, it is recommended that the Respondent be given a letter of reprimand and assessed a civil penalty of $500. DONE and RECOMMENDED this 28th day of July, 1983, in Tallahassee, Leon County, Florida. STEPHEN F. DEAN, Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 28th day of July, 1983. COPIES FURNISHED: Stephanie A. Daniel, Esquire Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 Mr. Damian C Davis 1310 West Charter Street Tampa, Florida 33602 Frederick Roche, Secretary Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 James Linnan, Executive Director Construction Industry Licensing Board Post Office Box 2 Jacksonville, Florida 32202 ================================================================= AMENDMENT TO AGENCY FINAL ORDER ================================================================= STATE OF FLORIDA DEPARTMENT OF PROFESSIONAL REGULATION CONSTRUCTION INDUSTRY LICENSING BOARD DEPARTMENT OF PROFESSIONAL REGULATION, Petitioner, vs. CASE NO. 19791 DOAH CASE NO. 83-1230 DAMIAN C. DAVIS DAVIS & SEXTON, INC. 1302 West Sligh Avenue Tampa, Florida 33604, Respondent. / AMENDMENT TO FINAL ORDER The Final Order entered on September 22, 1983 in this cause incorrectly stated the fine imposed upon the Respondent. The correct amount is $250.00, to be paid within 30 days of this Order. DONE AND ORDERED in Jacksonville, Florida, this 30th day of November , 1983. FLORIDA CONSTRUCTION INDUSTRY LICENSING BOARD Henry Bachara, Chairman

Florida Laws (2) 120.57489.129
# 1
CONSTRUCTION INDUSTRY LICENSING BOARD vs. ROBERT O. BARTHOLOMEW, 83-000413 (1983)
Division of Administrative Hearings, Florida Number: 83-000413 Latest Update: Sep. 27, 1983

Findings Of Fact Robert O. Bartholomew is registered as a general contractor and as a residential contractor holding licenses No. RG0025081 and No. RR0035491. Be was so registered at all times here relevant. Neither Carl Robinson nor his company, Atlas Associates, Inc., is registered as a building contractor in Pasco County. Robinson, acting for Atlas Associates, Inc., entered into a contract with Betty Valdez to construct an addition to her mobile home in Lutz, Pasco County, Florida, and requested Respondent to pull the building permit as neither Robinson nor Atlas Associates, Inc., is registered in Pasco County. Respondent pulled the permit, as contractor, for the work to be done on Valdez' home although he was not a party to the contract. Both Robinson and Respondent testified they worked under a verbal arrangement as partners in several projects; however, Respondent has no ownership interest in Atlas Associates, Inc. The work was started by Robinson's foreman, Hubbard, but after a short period on the job Hubbard was fired and Respondent took over the construction. Disputes arose between Ms. Valdez and the contractor and the work was not completed by Atlas Associates, Inc. Part of the contract provided for a roof over the existing roof on the trailer. Pasco County requires this work, like electrical and plumbing, to be done by one licensed in that field. No licensed roofer was used and no permit to have such work done by a licensed roofer was pulled. Following unsatisfactory termination of the contract between Atlas and Valdez, liens were filed by Atlas Associates, Inc., and Respondent against Valdez' property and countersuits were instituted by Valdez before both sides agreed to drop their claims. Respondent's contention that Ms. Valdez' agreement to drop all claims in settlement of the dispute somehow precludes this action, is without merit. In a separate proceeding Robinson was disciplined by the Board for his violations of the Construction Industry Licensing Law in contracting with Ms. Valdez when not properly licensed to do so.

Florida Laws (1) 489.129
# 3
PINELLAS COUNTY CONSTRUCTION LICENSING BOARD vs AUGUST NOCELLA, 95-003515 (1995)
Division of Administrative Hearings, Florida Filed:St. Petersburg, Florida Jul. 10, 1995 Number: 95-003515 Latest Update: Apr. 03, 1996

Findings Of Fact At all times pertinent to this proceeding, Respondent, August Nocella, was a certified aluminum contractor having been issued license number C-3197. Respondent was the certified contractor for Allied Aluminum Company (Allied Aluminum), 1017 Robinson Drive, St. Petersburg, Florida. On March 28, 1994, Mr. Tim Connolly contracted with Allied Aluminum to build a screen enclosure on an existing second floor deck. The screen enclosure was to be constructed at Mr. Connolly's residence located at 2200 Park Street, St. Petersburg, Florida, at a cost of $2,897.00. The proposal submitted to Mr. Connolly by Allied Aluminum on March 28, 1994, contained an option under which a third floor wood deck would be constructed for $2,000.00. Pursuant to the proposal, Mr. Connolly had ninety days in which to exercise this option. The proposal stated in part the following: <90 days from March 28, 1994, build wood deck approximately 400 square feet at $2,000> The proposal was not prepared or signed by Respondent, but by an employee of Allied Aluminum. The inclusion in the proposal of the option and estimate for construction of a deck was done without Respondent's knowledge or direction. Pursuant to the contract between Allied Aluminum and Mr. Connolly, the screen enclosure was constructed. The construction project began on April 28, 1994, and was completed on May 3, 1994. There is no proof that Respondent did not comply with the terms of the agreement, that the construction of the screen enclosure was not performed in a workman like manner, or that the work did not conform to existing building codes. The Standard Building Code, the code adopted by Pinellas County and applicable to construction projects in St. Petersburg, required that a contractor submit building plans and obtain a building permit prior to initiation of a construction project. Respondent applied for and secured a building permit for construction of the screen enclosure on May 31, 1994, four weeks after the project was completed. Plans for the screen enclosure were submitted with Respondent's application for the building permit. Respondent was assessed and paid $44.00 for the building permit. The Standard Building Code also required that the certified contractor call for an inspection of the construction project within six months of the completion date. Respondent completed the screen enclosure on or about May 4, 1994, but never called for an inspection of the work. At some point in April or May 1994, Mr. Connolly informed Respondent that he wanted the wood deck built under the terms and conditions set forth in the March 28, 1994 proposal. Respondent immediately told Mr. Connolly that he could not construct the third floor deck. Upon being informed by Respondent that he could not build the wood deck, Mr. Connolly insisted that Respondent find someone to construct the third floor deck pursuant to the terms in the proposal. Mr. Connolly threatened to withhold payment from Respondent for construction of the screen enclosure if Respondent failed to locate someone who could construct the deck at or below the price quoted in the proposal. Mr. Connolly followed through on his threats regarding payment to Respondent. On or about May 23, 1994, Mr. Connolly wrote a check to Respondent to pay for construction of the screen enclosure, but subsequently stopped payment on the check. In an effort to receive payment for construction of the screen enclosure and to appease Mr. Connolly, Respondent attempted to locate a builder who would construct the third floor deck. After looking in the St. Petersburg Telephone Directory, Respondent called several companies listed as builders of decks. Decked Out Construction, Inc. (Decked Out) was one of the companies contacted by Respondent on behalf of Mr. Connolly. The telephone directory entry for Decked Out contained a license number for the company as well as the address and telephone number of the business. Respondent interpreted the published license number as evidence that Decked Out was qualified to perform the type of work under which it was listed. No evidence was presented indicating that Decked Out was not so licensed. On or about May 23, 1994, Decked Out sent Randy Miller to Mr. Connolly's residence to determine if it could construct the deck and, if so, to give an estimate. Mr. Miller determined that Decked Out would be able to construct the third floor deck for a cost within the price range quoted in the March 28, 1994 proposal. After Respondent was informed by Randy Miller that Decked Out could construct the deck for the amount stated in the March 28, 1994 proposal, there was no further contact between Respondent and Mr. Miller. All communication regarding construction of the wood deck at 2200 Park Street North was between Mr. Connolly and Mr. Miller. The deck was constructed by Decked Out on or about May 26, 1994, at a cost of $1010.00. The construction project took about one day. The $1010.00 payment for construction of the third floor deck was given directly to Mr. Miller by Mr. Connolly. There is no evidence that Respondent's certificate as an aluminum contractor has been subjected to disciplinary action on any prior occasion by Petitioner. The normal penalty imposed for a contractor's failure to obtain a building permit prior to beginning a project is payment of twice the amount of the permit.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is therefore: RECOMMENDED that the Pinellas County Construction Board enter a Final Order finding Respondent, August Nocella, guilty of violating Chapter 89-504, Section 24(2)(d) and (n), Laws of Fla., and imposing a total fine of $144.00, $44.00 for failure to timely obtain a building permit, and $100.00 for failure to call for an inspection of the project. RECOMMENDED that Count III and COUNT IV of the Administrative Complaint be DISMISSED. DONE and ENTERED this 26th day of February, 1996, in Tallahassee, Florida. CAROLYN S. HOLIFIELD, Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 26th day of February, 1996. APPENDIX TO RECOMMENDED ORDER, CASE NO. 95-3515 To comply with the requirements of Section 120.59(2), Fla. Stat. (1995), the following rulings are made on the parties' proposed findings of fact: Petitioner's Proposed Findings of Fact. Accepted and incorporated. Accepted and incorporated except to extent unnecessary, irrelevant, or immaterial. Second sentence rejected as to the request that was made on April 20, 1995. The evidence shows that an inspection, not a permit, was requested on that date. Rejected as not supported by the greater weight of the evidence. Accepted as to statement that Respondent provided name of firm that would construct project in accordance with proposal amount. Statement that the firm or person was unlicensed is rejected as not supported by competent and substantial evidence. Second sentence is rejected as not supported by competent and substantial evidence, and by the greater weight of the evidence. COPIES FURNISHED: William J. Owens, Executive Director Pinellas County Construction Licensing Board 11701 Belcher Road, Suite 102 Largo, Florida 34643-5116 John E. Swisher, Esquire 669 First Avenue North St. Petersburg, Florida 33701 Howard Bernstein Senior Assistant County Attorney Pinellas County 315 Court Street Clearwater, Florida 34616

Florida Laws (2) 120.57120.68
# 6
CONSTRUCTION INDUSTRY LICENSING BOARD vs. PETER W. DETHLEFSEN, 88-000577 (1988)
Division of Administrative Hearings, Florida Number: 88-000577 Latest Update: May 20, 1988

Findings Of Fact Respondent has been a certified building contractor in the State of Florida. He held license number CB C033166. The license was first issued on March 7, 1985. As of March 31, 1988, Respondent had not renewed the license, which expired on June 30, 1987. Respondent is not and has never been certified as a contractor with the Orange County Building Department. On June 18, 1987, Respondent and Richard G. Rapagnani entered into a contract for Respondent to add a screen porch onto an existing slab at 8763 Belter Drive, Orlando, Orange County, Florida, which was Mr. Rapagnani's residence. The total contract price was $4013. The contract price was payable $1500 down, $1500 due upon completion of framing, and the balance due in two payments with the final payment due upon completion. Prior to obtaining the contract, Respondent assured Mr. Rapagnani that Respondent would take care of obtaining the necessary building permits for the job and that the job would be of high quality. Respondent began the work without obtaining the necessary building permits. He never obtained any permit or any inspection for the job. In performing the work, Respondent removed part of the existing roof. He placed a plastic sheet over the open area, but failed to affix the plastic so as to prevent rain from penetrating the roof, ceiling, and walls. After installing some posts and rafters, Respondent left the job. When asked numerous times by Mr. Rapagnani to return, Respondent offered various excuses. Respondent claimed that he needed more money and suggested that Mr. Rapagnani purchase some of the necessary materials directly from the suppliers. On July 10, 1987, Mr. Rapagnani paid Respondent $1000. Respondent in turn promised to work on July 17 and 18 with materials that he had recently purchased. However, when Respondent failed to show on July 17, Mr. Rapagnani called him and learned that he had no money left and no materials. Mr. Rapagnani then purchased shingles and skylights, and Respondent returned on July 18 to install them. He never completed the installation of these items, and the shingles and skylights that he did install leaked badly. Over a period of two months, Mr. Rapagnani called Respondent at least 50 to 60 times to request him to finish the job. Mr. Rapagnani paid Respondent a total of $2700 and paid an additional $789 for shingles, skylights, and other materials called for in the contract. In mid-August, Mr. Rapagnani fired Respondent. After hiring another contractor about six months later, Mr. Rapagnani was forced to spend approximately $3000 more to complete the work that Respondent had contracted to do. When the new contractor viewed Respondent's roofing job, the contractor determined that the roof was about to fall down due to faulty workmanship. Respondent had failed to secure the roof to the house. It took two to two and one-half days to correct the problem. While on the job, Respondent caused damage to the house and other property of Mr. Rapagnani. He damaged a window screen adjacent to the work area. He punched a hole through the drywall into the living room. His work on the roof led to water leakage into the bedroom. He dropped shingles onto Mr. Rapagnani's boat, thereby damaging it. He never fixed any of this damage. On October 27, 1987, the Orange County Building Department issued a Notice of Code Violation to Mr. Rapagnani listing 21 violations of the applicable code provisions. All of these violations, including the failure to obtain the necessary permits, were attributable to Respondent. Several of the violations pertained to work affecting the structural integrity of the roof and screen porch.

Recommendation In view of the foregoing, it is hereby RECOMMENDED that a Final Order be entered finding Respondent guilty of deliberately proceeding without a timely permit, deliberately failing to obtain a required inspection, and engaging in the contracting business with an expired license. It is recommended that the Final Order impose an administrative fine of $2500. ENTERED this 20th day of May, 1988, in Tallahassee, Florida. ROBERT E. MEALE Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 20th day of May, 1988. COPIES FURNISHED: David E. Bryant, Esquire Bryant, Reeves & Deer 220 East Madison Street Suite 530 Tampa, Florida 33602 Peter Dethlefsen 2190 Glenwood Drive Winter Park, Florida 32792 Peter Dethlefsen 628 Lander Road Winter Park, Florida 32792 Fred Seely Executive Director Construction Industry Licensing Post Office Box 2 Jacksonville, Florida 32201 William O'Neil General Counsel Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32399-0750

Florida Laws (4) 120.57489.115489.127489.129
# 7
CONSTRUCTION INDUSTRY LICENSING BOARD vs MICHAEL W. BALLANS, 89-005192 (1989)
Division of Administrative Hearings, Florida Filed:St. Cloud, Florida Sep. 22, 1989 Number: 89-005192 Latest Update: Apr. 16, 1990

The Issue The issue for disposition is whether, as alleged in the Administrative Complaint, Respondent committed various violations of Chapter 489, F.S., regulating the practice of contracting, by failing to complete a roofing job which he had agreed to perform.

Findings Of Fact At all times relevant, Michael W. Ballans was licensed by the State of Florida as a certified building contractor, holding License Number CB C036542. He qualified as an individual doing business at 1107 Oregon Avenue, St. Cloud, Florida 32769. On April 6, 1988, H. Earl Fisher signed his acceptance of a written proposal by Michael Ballans for Ballans to install a new roof on Fisher's double-wide trailer at 7650 E. Irlo Bronson Memorial Highway, in St. Cloud, Florida. The price for the job was $1,575.00, for supplies and labor. Fisher made an initial payment of $1,018.00 on June 6, 1988. Materials were delivered to the job site, but Ballans never commenced work. Fisher contacted Ballans four or five times to try to get him to do the job or to get someone else to do it. Ballans never returned the funds and at one point told Fisher that he could not do the work because he lost his insurance. Fisher did not agree to do the work himself and told Ballans he wanted the money back and the materials removed from his property. Stanton Alexander was qualified as an expert in construction industry contracting, including roofing. He has practiced in the profession for approximately thirty years. He served two terms on the construction industry licensing board, including a term as chairman. He has testified in the past as an expert in construction industry practices. A contractor terminates his responsibility under a contract after payment and final inspection and a certificate of occupancy has been issued. Until then, he is responsible for completion of the job. Proper procedure when a contractor becomes unable, to complete a job is to refund the money and remove the materials or to get permission from the building department and owner to bring in another contractor to complete the work. Michael Ballans did neither, and simply abandoned the job. This deviation from the standards of construction industry practice constitutes incompetency or misconduct.

Recommendation Based on the foregoing, it is hereby, RECOMMENDED That a Final Order be entered finding Michael W. Ballans guilty of violations alleged in Counts I, II and IV of the Administrative Complaint, and imposing a fine of $500.00. DONE AND RECOMMENDED this 16th day of April, 1990, in Tallahassee, Leon County, Florida. MARY CLARK Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904)488-9675 Filed with the Clerk of the Division of Administrative Hearings this 16th day of April, 1990. COPIES FURNISHED: Jack L. McRay, Esquire Dept. of Professional Regulation 1940 N. Monroe St., Suite 60 Tallahassee, FL 32399-0792 Michael W. Ballans 2314 Knob Hill Drive, Apt. #12 Okemos, Michigan 48864 Kenneth D. Easley, General Counsel Dept. of Professional Regulation 1940 N. Monroe St., Suite 60 Tallahassee, FL 32399-0792 Fred Seely, Executive Director DPR-Construction Industry Licensing Board P.O. Box 2 Jacksonville, FL 32202

Florida Laws (5) 120.57455.225455.227489.1195489.129
# 8
CONSTRUCTION INDUSTRY LICENSING BOARD vs. CARL F. DOYLE, 89-001166 (1989)
Division of Administrative Hearings, Florida Number: 89-001166 Latest Update: Jul. 31, 1989

Findings Of Fact Respondent, Carl F. Doyle, hereinafter referred to as Respondent, is licensed as a certified building contractor holding license number CB C015518 in the State of Florida. At all times material to this action the Respondent was licensed, and his address of record is Palm Harbor, Florida. The Department of Professional Regulation, Construction Industry Licensing Board, was and is the state agency charged with the regulation of contractors in the State of Florida. Respondent has never been the qualifying agent for Plantara Building Corporation, hereinafter referred to as Plantara. Janet Lee Valente was the qualifying agent for Plantara from December 1986 until October 1987. Respondent is and was the registered agent and director for Plantara at all times material to this action. Respondent negotiated the construction contract between Plantara and Jackie Evans and her daughter, Michelle Renee Evans. Respondent's license number was used to obtain the building permit for the Evans' home. The Evans and Plantara entered a contract to construct a new home in Pinellas County on March 29, 1986. In August 1986, construction of the Evans home began. Mrs. Jackie Evans noted a discrepancy in the plumbing which was corrected prior to pouring the slab. The plumbing discrepancy related to changes in the kitchen and bathroom requested by Mrs. Evans. Mrs. Evans had presented her request for changes to Respondent in March 1986. As construction proceeded, Mrs. Evans noted that her kitchen had a wall where an "island" should be. This was not corrected. A tub was put in the master bathroom and had to be removed because Mrs. Evans had requested a shower. In May of 1987, Mrs. Evans "closed" on the house but submitted to Respondent a list of several items to be repaired or completed. Plantara had access to Mrs. Evans home to complete the job but would often not keep appointments as scheduled. Prior to closing on her home in May 1987, Mrs. Evans had advised Plantara of items she desired to be corrected. After the May 1987 closing on the home, Mrs. Evans wrote Plantara again regarding items to be corrected or finished on her home. The gas dryer vent terminated in the attic, and not through the roof; a leak in the fireplace and the reversal of hot and cold water in the guest bathroom were three of the items to be corrected. Plantara corrected the problem with the water in the guest bath, a code violation, immediately. However, they failed to correct the gas dryer venting violation. As of the date of the hearing, there were numerous items still not corrected or repaired by Plantara. However, Mrs. Evans and Plantara reached a monetary settlement in April 1989 in which Plantara waived its claim of $5,000 under the contract in exchange for the Evans' release from liability. A letter of commitment for FHA financing was not received until December 23, 1986. The home received a certificate of occupancy on February 24, 1987. (T. pg. 20). There were numerous items to be corrected as of the closing date in May 1987 and as of the hearing date there remained items from the "list" which had not been corrected and/or repaired. Larry Wilson, Pinellas County Department of Consumer Affairs, observed leaks in the fireplace, uneven tile in the bathroom shower, closet doors not fitting properly, sloppy painting, bedroom windows not closing properly, siding loose, and patio concrete cracked when he inspected the home in November, 1987. Mr. Wilson stated that Mrs. Evans complaints were legitimate. Mr. Jerry Hicks, an expert in construction practices in Florida, testified that a "punchlist" such as Mrs. Evans list is usually completed within 30 days or sooner after the "closing" The contractor is responsible to complete the punchlist as the contractor is "charged with supervising the work.' Mr. Hicks opined that Respondent should have immediately responded to the problem with the dryer vent. In fact, when Mrs. Evans contacted the subcontractor, the problem was immediately corrected by the subcontractor. This indicates that Respondent had exercised little supervision over the subcontractors. (T. pg. 104, 116). Respondent had from February 1987 (the date of the certificate of occupancy) until May 1987 (the date of the "closing") to correct the punchlist. Respondent was unresponsive to the customer, and was not reasonably timely in completion of the punchlist. Respondent did not supervise the job as industry standards require. Respondent has been previously disciplined twice by the Construction Industry Licensing Board. Respondent offered in mitigation that the job was undertaken as a "favor" to the Evans and therefore they should have expected low priority treatment. However, as a mitigation gesture, the Respondent waived his right to receipt of the remaining $5,000 payment from the property owners.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that: Respondent be found guilty of violating Sections 489.129(1)(g) and 489.119, Florida Statutes by failing to qualify a firm and that an administrative fine be imposed in the amount of $500. Rule 21E-17.001(a), Florida Administrative Code. Respondent be found guilty of violating Section 489.129(1)(m), Florida Statutes, by gross negligence and misconduct in the practice of contracting which caused monetary or other harm to licensee's customer and that an administrative fine be imposed in the amount of $1,500, and that his contractor's license be suspended for three (3) months. DONE AND RECOMMENDED this 31st day of July, 1989, in Tallahassee, Leon County, Florida. DANIEL M. KILBRIDE Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 31st day of July, 1989. APPENDIX TO RECOMMENDED ORDER, CASE NO. 89-1166 The following constitutes my specific rulings, in accordance with section 120.59, Florida Statutes, on findings of fact submitted by the parties. PETITIONER'S PROPOSED FINDINGS: Paragraphs 1,2,3,4,5,6,7,8,9,10,11,4,15,16,17,18,19 (1st sentence), 20, 22,23,24,25,26,27 (in part), 29 are accepted, except as is irrelevant or subordinate. Paragraph 21, 28 are not supported by the evidence Paragraph 27 (in part is rejected as a conclusion of law. RESPONDENT'S PROPOSED FINDINGS: Paragraph 1 and 3 accepted and incorporated in findings Paragraph 2 rejected as against the weight of the evidence. Paragraphs 4 and 5 accepted in part as grounds for mitigation. COPIES FURNISHED: Elizabeth Alsobrook, Esquire Department of Professional Regulation The Northwood Centre Suite 60 1940 North Monroe Street Tallahassee, Florida 32399-0750 Carl F. Doyle 5 Stiles Lane Palm Harbor, Florida 34683 Fred Seely Executive Director Construction Industry Licensing Board Post Office Box 2 Jacksonville, Florida 32301 Kenneth E. Easley General Counsel Department of Professional Regulation Northwood Centre 1940 North Monroe Street Suite 60 Tallahassee, Florida 32399-0792

Florida Laws (4) 120.57489.105489.119489.129
# 9
CONSTRUCTION INDUSTRY LICENSING BOARD vs. GEORGE G. VINCENT, 82-001341 (1982)
Division of Administrative Hearings, Florida Number: 82-001341 Latest Update: Apr. 27, 1983

Findings Of Fact The Respondent is a registered roofing contractor, having been issued license number RC 0034898. He operates a business known as B & P Roofing at 244 Tollgate Trail, Longwood, Florida. The Respondent has appropriately qualified the business name of "B & P Roofing" with the Petitioner. The Petitioner is an agency of the State of Florida charged with enforcing the provisions of Chapter 489, Florida Statutes, with regard to licensure of building contractors, the regulation of their licensure status and methods of operation and practice. During June of 1981, the Respondent, doing business as B & P Roofing, contracted to perform a re-roofing job with Mr. Jack Mewhirter, whereby he was to put a new roof on a residence at 137 Variety Tree Circle, Altamonte Springs, Florida. The construction of the roof was contracted for and completed during June, 1981. The Respondent failed to obtain a building permit before or during construction of the roof and also failed to obtain a final inspection of the roof when it was finished in June, 1981. The Respondent's testimony establishes that the Respondent was familiar with the building code adopted in Seminole County and familiar with the requirement that he was responsible as the contractor, to obtain a permit before commencing construction of the roof and that he was also responsible for obtaining a final inspection by the Seminole County Building Official. In response to a complaint from Mr. Mewhirter, the owner of the residence, the Seminole County Building Officials, Mr. Flippent and Mr. Del'Attibeaudierer became aware that no building permit had been obtained for the re-roofing job and that no final inspection had been obtained pursuant thereto. Accordingly, Mr. Del'Attibeaudierer inspected the roof in November, 1981, and Mr. Flippent informed the Respondent of the necessity to obtain a building permit and a final inspection. Thus, on November 10, 1981, the Respondent obtained the building permit and called for the final inspection. Mr. Del'Attibeaudierer was unable to sign the final inspection document as "satisfactory" because he was unable to adequately inspect the roof once it was finished. He had been unable to inspect the method by which it was installed during its construction due to the Respondent failing to inform him or his superiors that the roof was under construction and that inspections were needed at that time. hen the Respondent entered into the contract with Mr. Mewhirter, he informed Mr. Mewhirter that he would not obtain a building permit because that would "drive the cost up." The Respondent, in his testimony, denied that he made such a statement, but Mr. Mewhirter's testimony is here found more credible because of the facts established by Mr. Del'Attibeaudierer's testimony that a random check of the roof after he finally was able to inspect it in November, 1981, revealed that all the shingles he examined were nailed with only three nails and were nailed too high up near the upper edge of the shingle, which is a substandard method of installing the roof and which permits storm winds or rain to raise the shingles, causing possible damage to the roof. The fact that the roof was installed in this fashion and that fact that the Respondent admittedly knew of the requirements of the building code and the requirement that a permit be obtained and inspections be made during the course of and at the conclusion of the job, indicated that the Respondent was knowingly trying to avoid the necessity of obtaining a permit and a final inspection and thus lends sufficient credibility to Mr. Mewhirter's testimony regarding the reason the Respondent obtained no permit. In any event, the roof was shown to not be constructed in accordance with the building code. In summary, it was established that the Respondent knew of the appropriate building code, was thoroughly familiar with it and and indeed had installed an excess of seven hundred roofs since he entered the business. He was aware, in connection with the need for obtaining a building permit, that he should also obtain inspections during the construction and a final inspection when the roof was finished, which he failed to do until reminded of his violation by the building department five months after the roof was completed, at which time it was too late to perform the appropriate inspections. Thus, the roof could not be approved by the building department of Seminole County. The Respondent admitted to only being present on the subject job site for approximately an hour and a half during the entire construction of the roof and he admittedly did not bother to look to see if a permit was on the job site at that time, or any other time. Finally, although the Respondent remonstrated that his failure to get a building permit at the appropriate time was inadvertent and due to his assumption that other office personnel had taken care of the obtaining of the permit, that testimony is not found to be credible since it was established, through the testimony of Mr.. Mewhirter, that the Respondent consciously decided not to obtain a permit prior to starting construction of the roof.

Recommendation Having considered the foregoing Findings of Fact, Conclusions of Law, the evidence in the record and the candor and demeanor of the witnesses and the pleadings and arguments of the parties, it is, therefore RECOMMENDED: That the Respondent, George G. Vincent, be found guilty of the charges contained in Counts I and II of the Administrative Complaint and that an administrative fine of $1,000 be imposed. DONE and ENTERED this 23rd day of February, 1983, in Tallahassee, Florida. P. MICHAEL RUFF, Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 23rd day of February, 1983. COPIES FURNISHED: John O. Williams, Esquire 547 North Monroe Street Suite 204 Tallahassee, Florida 32301 Gary Siegel, Esquire 292 U.S. Highway 17-92 P.O. Drawer 965 Fern Park, Florida 32730 James A. Linnan, Executive Director Construction Industry Licensing Board P.O. Box 2 Jacksonville, Florida 32202 Fred Roche, Secretary Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 ================================================================= AGENCY FINAL ORDER ================================================================= STATE OF FLORIDA DEPARTMENT OF PROFESSIONAL REGULATION CONSTRUCTION INDUSTRY LICENSING BOARD DEPARTMENT OF PROFESSIONAL REGULATION, Petitioner, v. DPR Case No. 0017669 DOAH Case No. 82-1341 GEORGE C. VINCENT B & P Roofing RC 0034898 244 Tollgate Trail Longwood, Florida 32750, Respondent. /

Florida Laws (2) 120.57489.129