Elawyers Elawyers
Ohio| Change
Find Similar Cases by Filters
You can browse Case Laws by Courts, or by your need.
Find 49 similar cases
TALLAHASSEE ASSOCIATES, LTD. vs DIVISION OF LICENSING AND CROSSLAND AGENCY, 91-001306BID (1991)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Feb. 26, 1991 Number: 91-001306BID Latest Update: Mar. 22, 1991

Findings Of Fact In November, 1990, the Respondent, the Department of State, sought proposals for the lease of office space for its Division of Licensing. On or prior to December 7, 1990, the proposal opening date, at least six proposals were received by the Respondent. Those proposals were designated by the Respondent as "Tallahassee Associates" (the Petitioner's proposal), "Crossland Agency" (the Intervenor's proposal), "Woodcrest A", "Woodcrest B", "T.C.S." and "DeVoe". On January 2, 1991, the Respondent posted a standard form Bid Tabulation indicating that the following scores had been awarded to the following proposals: Proposal Score Woodcrest A 82 Woodcrest B 82 Tallahassee Associates 73 Crossland Agency 85 DeVoe 54 The proposal of T.C.S. was not evaluated by the Respondent because it was determined to be non-responsive. The Respondent also posted a copy of a memorandum dated January 2, 1991, with the January 2, 1991, Bid Tabulation. The memorandum was from John M. Russi, Director of the Division of Licensing, to Ira Chester, Chief of the Bureau of General Services. Mr. Russi indicated in the memorandum that the Intervenor would be awarded the lease. Attached to Mr. Russi's January 2, 1991, memorandum was a Lease Evaluation Worksheet which indicated the scores which had been awarded by the evaluation committee to the responsive bidders for each of the criteria to be considered in determining the winning bidder. Printed at the top-center of the January 2, 1991, Bid Tabulation was the following notice: FAILURE TO FILE A PROTEST WITHIN THE TIME PRESCRIBED IN SECTION 120.53(5), FLORIDA STATUTES, SHALL CONSTITUTE A WAIVER OF PROCEEDINGS UNDER CHAPTER 120, FLORIDA STATUTES. . . . The January 2, 1991, Bid Tabulation was posted at 1:00 p.m., January 2, 1991. Therefore, pursuant to Section 120.53(5), Florida Statutes, any bidder desiring to contest the Respondent's proposed award of the lease was required to file a notice of protest with the Respondent no later than 1:00 p.m., January 5, 1991, and a formal written protest on or before January 15, 1991. T.C.S. filed a notice of protest and a formal written protest to the January 2, 1991, Bid Tabulation within the time periods prescribed by Section 120.53(5), Florida Statutes. T.C.S. contested the Respondent's determination that it was not responsive. The Petitioner did not file a notice of protest or a formal written protest to the January 2, 1991, Bid Tabulation within the time periods prescribed by Section 120.53(5), Florida Statutes. Pursuant to Section 120.53(5), Florida Statutes, the Respondent reviewed the formal written protest filed by T.C.S. and agreed that T.C.S. was responsive. After agreeing that T.C.S. was responsive, the Respondent evaluated T.C.S.'s proposal and awarded points for each of the criteria to be considered. Toward the end of January, 1991, after deciding that T.C.S.'s proposal was to be evaluated, the Respondent notified all other bidders of its decision in a document titled Posting of Notice of Agency Decision. The Posting of Notice of Agency Decision was signed by the Respondent's General Counsel and was addressed to "All Responsive Bidders". The Posting of Notice of Agency Decision provided, in pertinent part: Notice is hereby given that the Florida Department of State, Division of Licensing, is reviewing the bid tabulation which was posted at 1:00 P.M., January 2, 1991 for Lease No. 450:0070. The revised bid tabulation will be posted at 8:00 A.M. on February 4, 1991 at the Purchasing Office of the Department of State . . . . Failure to file a protest within the time prescribed in Section 120.53(5), Florida Statutes, shall constitute a waiver of proceeding under Chapter 120, Florida Statutes. Any person interested in the new tabulation should contact . . . after the posting time listed above. The Petitioner filed a notice of protest and a formal written protest challenging the Posting of Notice of Agency Decision within the times prescribed by Section 120.53(5), Florida Statutes. The Respondent dismissed this formal written protest by final order dated February 22, 1991. On or about January 31, 1991, more than four weeks after the posting of the January 2, 1991, Bid Tabulation, Ocie Allen spoke by telephone with Phyllis Slater, the Respondent's General Counsel. Ms. Slater told Mr. Allen that all proposals would be reevaluated as a result of T.C.S.'s protest. Mr. Allen was a lobbyist for the Petitioner in January, 1991. On February 4, 1991, the Respondent posted another standard form Bid Tabulation indicating that the following scores had been awarded to the following proposals: Proposal Score Crossland Agency 83 Woodcrest A 80 Woodcrest B 80 Tallahassee Associates 71 T.C.S. 71 DeVoe 51 The differences in the scores of the proposals which had been listed on the January 2, 1991, Bid Tabulation, which are reflected in the February 4, 1991, Bid Tabulation were caused by automatic changes in the scores resulting from the addition of T.C.S. and the fact that T.C.S. had the lowest priced bid. The points awarded for the "rental" criterion, which was worth up to 25 points, were determined by a mathematical formula by which the scores of each bidder are calculated based upon the proposed rental charges of all bidders. The award of points for this criterion was determined objectively based upon the mathematical formula. By adding another bidder, T.C.S., the points awarded to all the proposals automatically changed. The scores of the proposals which had been listed on the January 2, 1991, Bid Tabulation, were not otherwise changed. Nor were the proposals of any bidder reevaluated. The Respondent also posted a copy of a memorandum dated January 24, 1991, with the February 4, 1991, Bid Tabulation. The memorandum was from John M. Russi, Director of the Division of Licensing, to Ira Chester, Chief of the Bureau of General Services. Mr. Russi indicated the following in the memorandum: Pursuant to the settlement stipulation signed by Counsel for T.C.S. Associates on January 23, 1991, in reference to the Bid Protest filed January 11, 1991, the attached "Lease Evaluation Work Sheet" is provided for you to re-post. After reevaluating six bid proposals, the evaluating committee concludes that Crossland Agency should be awarded this bid. Each bidder needs to be notified by certified mail of this action. . . . . Attached to Mr. Russi's January 24, 1991, memorandum was a Lease Evaluation Worksheet which indicated the scores of the responsive bidders which had been awarded by the evaluation committee for each of the criteria to be considered in determining the winning bidder. On February 6, 1991, the Petitioner filed a notice of protest to the February 4, 1991, Bid Tabulation. The Petitioner filed a Formal Written Protest, Request for Formal Hearing and Motion for Stay with the Respondent on February 18, 1991. These documents were filed within the time periods specified in Section 120.53(5), Florida Statutes. The Petitioner's Formal Written Protest was filed with the Division of Administrative Hearings by the Respondent on February 28, 1991. Crossland Agency, Inc., was allowed to intervene in the proceeding. On March 1, 1991, the Respondent and Intervenor filed a Motion to Dismiss. A motion hearing was conducted on March 6, 1991, to consider the Motion to Dismiss.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that a final order be issued by the Respondent granting the Motion to Dismiss and dismissing this case, with prejudice. DONE and ENTERED this 22nd day of March, 1991, in Tallahassee, Florida. LARRY J. SARTIN Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 22nd day of March, 1991. APPENDIX TO RECOMMENDED ORDER The parties have submitted proposed findings of fact. It has been noted below which proposed findings of fact have been generally accepted and the paragraph number(s) in the Recommended Order where they have been accepted, if any. Those proposed findings of fact which have been rejected and the reason for their rejection have also been noted. The Petitioner's Proposed Findings of Fact Proposed Finding Paragraph Number in Recommended Order of Fact Number of Acceptance or Reason for Rejection 1 3, 5 and 9. 2 12-13. 3 15-16 and 18-21. See 14. 15. The weight of the evidence failed to prove that the scores of the bidders for the "option period" criterion reflected on the January 2, 1991, Bid Tabulation were modified or reconsidered on the February 4, 1991, Bid Tabulation. The suggestion that "the department had discretion to change scores in any of the remaining eight categories" is a conclusion of law and is rejected. These proposed facts are not relevant to the issue raised in the Motion to Dismiss. Nor was any evidence presented to support these proposed findings. 12. The last sentence is a conclusion of law and is rejected. Proposed Findings of Fact of the Respondent and Intervenor Proposed Finding Paragraph Number in Recommended Order of Fact Number of Acceptance or Reason for Rejection 1 1-2. 3 and 7. 5-6 and hereby accepted. 4 8-12. 5 See 14. 6 15 and 17. 18. The last sentence involves an issue not raised in the Motion to Dismiss or at the motion hearing. Nor was any evidence presented to support these proposed findings. See the Preliminary Statement. COPIES FURNISHED: Linda G. Miklowitz, Esquire 1589 Metropolitan Boulevard Tallahassee, Florida 32308 Benjamin E. Poitevent Assistant General Counsel Department of State The Capitol, MS #4 Tallahassee, Florida 32399-0250 M. Christopher Bryant, Esquire Post Office Box 6507 Tallahassee, Florida 32314-6507 Honorable Jim Smith Secretary of State The Capitol Tallahassee, Florida 32399-0250

Florida Laws (3) 120.53120.57255.25
# 1
CHD MARKETING GROUP AND NORLAKE, INC. vs PALM BEACH COUNTY SCHOOL BOARD, 92-003135BID (1992)
Division of Administrative Hearings, Florida Filed:West Palm Beach, Florida May 22, 1992 Number: 92-003135BID Latest Update: Dec. 14, 1992

Findings Of Fact Respondent issued an invitation to bid on March 13, 1992. Bid number SB 92-244I involved the disassembly and removal of an existing walk-in freezer and the furnishing and installation of a new walk-in freezer at Coral Sunset Elementary School. The invitations to bid provided in paragraph Y of the Special Conditions: Failure to file a specification protest within the time prescribed in Florida Statutes 120.53 3.(b) shall constitute a waiver of proceedings under Chapter 120, Florida Statutes. (sic) Bid specifications were included in the invitations to bid issued on March 13, 1992. Twenty-three bids were solicited. There were five responses. One of the responses was submitted by Choice Restaurant Equipment, Inc. ("Choice"). Choice is a vendor for equipment manufactured by Petitioner, Nor-Lake, Inc. ("Nor-Lake"). Nor-Lake is an out-of-state corporation with manufacturer's representatives in numerous states including Florida. 4, Petitioner, CHD Marketing Group ("CHD"), is the manufacturer's representative for Nor-Lake in Florida. CHD represents no other manufacturer of the product included in the bid response. Choice is a sales agent for CHD and other manufacturer's representatives in Florida. Choice sells the products of a variety of manufacturers but is the exclusive sales agent for CHD pursuant to a verbal agency agreement. Choice timely submitted a bid for bid number SB 92-244I on April 8, 1992, prior to the bid deadline of 2:00 p.m. on the same day. The successful bidder submitted its bid by Federal Express at 4:51 p.m on April 8, 1992. Respondent's Department of Purchasing and Stores (the "Department") had stated on March 13, 1992, when the invitations to bid were issued, that bid responses must be received by the Department no later than 2:00 p.m. on April 8, 1992, at the Department's address at 3980 RCA Boulevard/Suite 8044, Palm Beach Gardens, Florida, 33410-4276. Prior to April 8, 1992, the Department relocated to a new facility at 3326 Forest Hill Boulevard, West Palm Beach, Florida. The new address was posted at the old location and Department representatives were present at the old address to accept walk-in bids. Federal Express first attempted to deliver the successful bid at the Department's old address at 10:30 a.m. on April 8, 1992. Federal Express delivered the successful bid to the Department's new address at 4:51 p.m. At 2:00 p.m. on the same day, The Department announced that all bids were in and opened the bids that had been delivered. The successful bid and one other bid were delivered on April 8, 1992, after the public opening conducted at 2:00 p.m. on the same day. Bids were tabulated on April 9, 1992. Bid tabulations were posted on April 13, 1992, and the successful bid was announced. The successful bid was for $8,174.00. Three bids were lower than the successful bid. Choice's bid was for $7,742.56. The other two lower bids were for $8,020.00 and $6,620.00. All three lower bids were rejected as non- responsive. Choice's bid was rejected because it did not meet bid specifications for 22 gauge steel, thermostatically controlled door heaters, and reinforced steel door panels. CHD filed a Notice of Protest on April 14, 1992, and a Formal Written Protest on April 24, 1992. CHD's protest alleges that: Choice's bid was lower than that of the successful bidder; the successful bid was not timely made; the bids were not opened publicly in violation of bidding procedure requirements; and the bid specifications were arbitrary and capricious, favored one bidder, and that Choice's bid was responsive. Neither a notice of protest nor a formal written protest was submitted by Choice or Nor-Lake. Neither Choice nor Nor-Lake attended the informal protest conference conducted on April 30, 1992. On May 7, 1992, Respondent's Office of General Counsel issued its written notice of proposed agency action. The written notice recommended that the bid be awarded to the successful bidder and that CHD's protest be dismissed for lack of standing. CHD requested a formal hearing on May 14, 1992, and the matter was referred to the Division of Administrative Hearings for assignment of a hearing officer on May 15, 1992. The bid submitted by Choice was prepared by CHD but signed by the president of Choice. Neither Nor-Lake nor CHD signed a bid or were otherwise bidders of record for bid number SB 92-244I. Neither Choice, CHD, nor Nor-Lake, filed a notice of protest concerning the bid specifications within 72 hours after Choice received the notice of the project plans and specifications on March 13, 1992. The sole basis upon which CHD claims it is substantially affected is the adverse economic impact caused to it by the proposed agency action. The proposed agency action will result in lost sales from this and future transactions. CHD will lose commissions from this and future transactions. The dealer relationship between CHD and Choice will be damaged because Choice will not want to sell a freezer that is not acceptable to Respondent. The marketing strategy developed between CHD and Nor-Lake will be damaged because it is conditioned upon the award of public contracts.

Florida Laws (1) 120.53
# 2
KELLY SERVICES vs. BAY COUNTY SCHOOL BOARD, 88-003768BID (1988)
Division of Administrative Hearings, Florida Number: 88-003768BID Latest Update: Sep. 13, 1988

The Issue The issue is whether Kelly Services is the lowest responsive bidder on Bid No. 89-23 and should be awarded the bid.

Findings Of Fact On June 2, 1988, the School Board of Bay County issued Bid Request No. 89-23 for garbage collection services at thirteen locations. A quotation sheet was included in the bid package. The quotation sheet indicated the thirteen locations with a blank next to each location and a dollar sign in front of each blank where each bidder was to indicate its average monthly total charge for each location. There was also a quotation schedule where the bidder was to indicate the calculations which went into the total bid for each location. The bid request provided: The Board reserves the right to waive formalities and to reject any and all bids or to accept any bid or combination of bids deemed in the Board's best interest and the decision of the Board will be final. Bidders desiring that their bid be considered on an all-or-none basis, either in whole or part, shall so indicate. It is the intent of this bid request to secure prices and establish contracts for garbage collection services for the twelve schools specified herein and the District Maintenance Department. Awards will be made by location and will be based on an average monthly total charge as calculated on the quotation sheet. The bids were opened at 10:00 am., June 13, 1988, at the offices of the Bay County School Board. Three completed bid packages were submitted. Kelly Services, Argus and M&O each submitted a completed bid quotation sheet containing the bid for each location. M&O also submitted a letter which stated: We would like to submit this bid on an all- or-nothing basis as specified in paragraph four of the cover letter to the bid. For an estimated cost of $3,391.84. The quotation sheet and quotation schedule submitted by M&O did not reflect the all-or-nothing bid amount. Instead, the quotation sheet and quotation schedule showed a total bid of $3,738.24 when calculated by location. Based on the bids submitted by each bidder as shown on the quotation sheet add quotation schedules, Kelly Services was low bidder on five locations (Callaway, Tyndall, Waller, Southport, and Cedar Grove) ; Argus was low bidder on six locations (Parker, Hiland, Haney, Mosley, Beach and Merritt Brown); and M&O was low bidder on two locations (West Bay and the District Maintenance Department). Prior to the deadline for submitting bids, John Harrison, Purchasing Agent for the Board, responded to an inquiry from M&O by advising M&O that it could submit two bids, one as specified in the Bid Request by location and one as an all-or- nothing bid. No other bidders were advised that they could submit two bids. At the bid opening, M&O did not submit a quotation sheet or schedule for its all-or-nothing bid. A bid which did not have a breakdown per dump per container per facility would not be acceptable to the Board and does not meet the specifications in the Bid Request. The breakdown per dump per container per location is necessary to verify proper invoicing for specific locations on months when there is a change in the number of dumps or containers at that location. After opening the bids, the Board compiled the low bid for each location and then totaled that list. That total of $3,606.09 was greater than the all-or-nothing bid by M&O. Because M&O's all-or-nothing bid failed to meet the specifications by not having a location breakdown the Board contacted M&O to determine if its "estimated" bid was firm and to request a breakdown on the quotation schedule form for the all- or-nothing bid. On June 15, 1988, two days after the bid opening, M&O submitted a letter to the Board clarifying that its all-or- nothing bid was a firm bid for each location and M&O submitted a quotation schedule for each location per dump per container (see page 7 of Joint Exhibit 1 and the last page of Joint Exhibit 2). The charge for each location in this quotation schedule is different than the quotation schedule submitted by M&O at the bid opening and is for the most part lower per location than either M&O's first quotation schedule or the low bids taken from the quotation schedules submitted at the bid opening. Based on the letter and all-or-nothing quotation schedule filed by M&O on June 15, 1988, the Board determined to award the bid for garbage collection services to M&O for the all- or-nothing bid of $3,391.84.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law it is RECOMMENDED that The School Board of Bay County enter a Final Order rejecting all bids and readvertising the bid request for garbage collection services as specified in Bid Request No. 89-23. DONE and ENTERED this 13th day of September, 1988, in Tallahassee, Florida. DIANE K. KIESLING Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 13th day of September, 1988. APPENDIX TO THE RECOMMENDED ORDER IN CASE NO. 88-3768BID The following constitutes my specific rulings pursuant to Section 120.59(2), Florida Statutes, on the proposed findings of fact submitted by the parties in this case. Specific Rulings on Proposed Findings of Fact Submitted by Petitioner, Kelly Services: 1. Each of the following proposed findings of fact are adopted in substance as modified in the Recommended Order. The number in parentheses is the Finding of Fact which so adopts the proposed finding of fact: 1-3(1-3); 4-6(3); 7-11(7-11); and 12 (9) Specific Rulings on Proposed Findings of Fact Submitted by Respondent, School Board of Bay County: Each of the following proposed findings of fact are adopted in substance as modified in the Recommended Order. The number in parentheses is the Finding of Fact which so adopts the proposed finding of fact: 1(2); 3(10&11); and 5(8). Proposed findings of fact 6, 7, and 9 are irrelevant. The first sentence of proposed finding of fact 2 is unsupported by the competent, substantial evidence. The remainder of proposed finding of fact 2 is adopted in substance as modified in Finding of Fact 3. Proposed finding of fact 4 is rejected as being unsupported by the competent, substantial evidence. The last sentence of proposed finding of fact 5 is rejected as being argumentative, conclusory and unsupported by the competent, substantial evidence. Proposed finding of fact 8 is unnecessary. Specific Rulings on Proposed Findings of Fact Submitted by Intervenor, Argus Services, Inc.: Each of the following proposed findings of fact are adopted in substance as modified in the Recommended Order. The number in parentheses is the Finding of Fact which so adopts the proposed finding of fact: 2-4(1-3); 6-8(5); 9 & 10(6) 11(3); and 12(11). Proposed findings of fact 1 and 5 are unnecessary. Proposed findings of fact 13-17 are rejected as constituting argument and not findings of fact. COPIES FURNISHED: Jeffrey P. Whitton Attorney at Law Post Office Box 1956 Panama City, Florida 32402 Franklin R. Harrison Attorney at Law 304 Magnolia Avenue Panama City, Florida 32401 Scott W. Clemons Attorney at Law Post Office Box 860 Panama City, Florida 32402 School Board of Bay County Post Office Drawer 820 Panama City, Florida 32402-0820 M&O Sanitation, Inc. 266 N. Star Avenue Panama City, Florida 32404

Florida Laws (1) 120.57
# 3
CON-AIR INDUSTRIES, INC. vs SEMINOLE COUNTY SCHOOL BOARD, 98-004714BID (1998)
Division of Administrative Hearings, Florida Filed:Sanford, Florida Oct. 27, 1998 Number: 98-004714BID Latest Update: Jan. 20, 1999

The Issue Whether the School Board of Seminole County's, notice of intent to award Bid No. 102589, for air filter maintenance, service, and replacement to Filter Service and Installation Corporation was clearly erroneous, contrary to competition, arbitrary, or capricious.

Findings Of Fact The Seminole County School District is a political subdivision of the State of Florida, created by Article IX, Section 4, Florida Constitution. The powers and duties of the school board are enumerated in Chapter 230, Florida Statutes. The Superintendent of the Seminole County School District is a constitutional officer, whose office is created by Article IX, Section 5, Florida Constitution. The powers and duties of the Superintendent are enumerated in Chapter 230, Florida Statutes. The Seminole County School Board issued a call for bids for air filter maintenance service and replacement under Bid No. 102589 on September 14, 1998. Bids were submitted by Con-Air Industries, Inc., the protester, and Filter Service & Installation Corp., the apparent low bidder. The bids were opened on September 28, 1998, and were evaluated. Each bidder was determined to be a responsible bidder to the CFB. Intervenor submitted the lowest numerical bid. On October 1, 1998, Respondent's staff recommended that the CFB be awarded to Intervenor. The decision to recommend the award of the filter service Bid No. 102589 complies with the bid specifications. The instructions to bidders, as stated on the Proposal Form, direct a bidder to total lines A-C and to enter the total at line D. The instructions state that a bidder is not to include the cost as stated at lines E & F in the total. The proposal form then states that the total cost, as stated at line D shall be used to determine the apparent low bidder. The bid proposal document stated that the total of the prices stated at items A, B, and C would be used to determine the lowest numerical bid. The bid proposal document stated that the Respondent reserves the right to negotiate unit cost proposed for item E. The line D total submitted by the Petitioner is stated at $3.45. The line D total submitted by the apparent low bidder, is stated at $2.60. Intervenor submitted the lowest numerical bid. Intervenor does business under the fictitious name Filter Sales & Service. That fictitious name has been registered with the Secretary of State for the State of Florida. Filter Service & Installation Corp., and Filter Sales & Service are one and the same. The reference by Intervenor at line F to "Per Price Sheet" and the failure of Filter Service & Installation Corp. to attach a price sheet to its proposal form is not a material deviation from the requirements of the bid specifications. The total at line D is the total used to determine the lowest bidder. Filter Service & Installation Corp. is the lowest and best bid from a responsive and responsible bidder. The Petitioner followed the procedure set forth in the bid proposal document in making a determination that the Intervenor was the lowest numerical bidder. Petitioner reserved the right to reject all bids and to waive any informalities. Petitioner failed to prove that the notice of intent to award the bid to Intervenor was clearly erroneous, contrary to competition, arbitrary, or capricious.

Recommendation Upon the foregoing findings of fact and conclusions of law, it is RECOMMENDED that the Respondent award the contract for filter maintenance, service, and replacement under Bid No. 102589 to the Intervenor, Filter Service and Installation Corp., as recommended by its staff. DONE AND ENTERED this 11th day of December, 1998, in Tallahassee, Leon County, Florida. DANIEL M. KILBRIDE Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 Filed with the Clerk of the Division of Administrative Hearings this 11th day of December, 1998. COPIES FURNISHED: Robert N. Hering, President Con-Air Industries, Inc. 3055 Pennington Drive Orlando, Florida 32804 Ned N. Julian, Jr., Esquire Seminole County Public Schools Legal Services Department 400 East Lake Mary Boulevard Sanford, Florida 32773-7127 Robert W. Smith, Esquire 430 North Mills Avenue, Suite 1000 Orlando, Florida 32803 Dr. Paul J. Hagerty, Superintendent Seminole County Public Schools 400 East Lake Mary Boulevard Sanford, Florida 32773-7127

Florida Laws (1) 120.57
# 4
NEEL MECHANICAL CONTRACTORS, INC. vs FLORIDA A & M UNIVERSITY AND BOARD OF REGENTS, 99-003424BID (1999)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Aug. 11, 1999 Number: 99-003424BID Latest Update: Jan. 26, 2000

The Issue Whether the Florida A&M University's intended action to reject all bids and re-advertise the project to construct "Utilities Improvement-Central Chilled Water Plant, Phase V", known as BR-389, is illegal, arbitrary, dishonest, or fraudulent.

Findings Of Fact Based on the oral and documentary evidence presented at the final hearing and on the entire record of this proceeding, the following findings of fact are made: Parties Neel Mechanical Contracting, Inc., is a Georgia corporation authorized to do business in Florida and licensed by the Florida Construction Industry Licensing Board. Its business is air conditioning, and it specializes in larger projects such as the one at issue herein. Robert C. Sullivan is the President of Neel Mechanical. Thomas Gregory Lang is a project manager employed by Neel Mechanical and the chief estimator for Neel Mechanical; Mr. Lang is the person primarily responsible for preparing Neel Mechanical's bid proposal for Project BR-389. The Florida Board of Regents is a corporate body consisting of the Commissioner of Education and thirteen citizens appointed by the Governor and approved by three members of the Cabinet; it is subject to the general supervision and control of the Department of Education. Sections 240.203(2), 240.205, and 240.207(1), Florida Statutes (1999). The Board of Regents is a member of the State University System, is charged generally with overseeing the state universities, and has the authority to approve and execute contracts for "construction for use by a university when the contractual obligation exceeds $1 million." Sections 240.209 and 240.205(6), Florida Statutes (1999). 4/ Florida Agricultural and Mechanical University ("FAMU") is a public university located in Tallahassee, Florida, and is one of ten universities in Florida's State University System. Section 240.2011, Florida Statutes (1999). The university president is the chief administrative officer of the university and is responsible for its operation and administration. Section 240.227, Florida Statutes (1999). At the times material to this proceeding, Frederick S. Humphries was president of FAMU, and Samuel J. Houston was the Director of FAMU's Office of Facilities Planning and Construction. Mr. Houston has primary responsibility for supervising the bid process and the staff that prepared the bid documents and evaluated the bids for Project BR-389. Mr. Houston acts in this capacity on behalf of President Humphries and the Board of Regents. Mr. Houston also is ultimately responsible for the administration of Project BR-389. Bayou Mechanical, Inc. ("Bayou Mechanical") is a mechanical contractor which submitted a bid on Project BR-389. Call for Bids In Volume 25, Number 13, of the Florida Administrative Weekly, dated April 2, 1999, FAMU, on behalf of the Board of Regents, issued a Call for Bids on Project BR-389, which involves construction of a chilled water plant on the FAMU campus. The Call for Bids provided that all bidders must have a valid Florida license to do the work at the time of bid opening and a minimum of five years experience with similar projects. Project BR-389 involves a construction contract and is the fifth phase of the construction of an underground chilled water system on the FAMU campus. The project consists of constructing a portion of the system and connecting it to the existing system. The Call for Bids notified prospective bidders that sealed bids would be received at FAMU on May 4, 1999, until 2:00 p.m., after which time the bids would be opened and the bid tabulations posted. The Call for Bids further provided: "Bids must be submitted in full and in accordance with the requirements of the drawings and Project Manual." The Call for Bids advised that these documents were available at the offices of the Architect/Engineer for the project, Bosek, Gibson & Associates, Inc. ("Bosek, Gibson"), in Tallahassee, Florida. In Addendum #2 to the Project Manual, dated April 30, 1999, the date for submission of bids was changed from May 4, 1999, to May 11, 1999. The Project Manual contains Instructions to Bidders, consisting of pages 6 of 106 through 22 of 106 and dated October 16, 1989; General Conditions of the Contract for Construction, consisting of pages 23 of 106 through 106 of 106 and dated October 16, 1989; Special Conditions of the Contract, consisting of pages I-1 through I-10 and dated October 16, 1989; Supplement J to the Project Manual, consisting of pages 1 through 11 and dated February 13, 1996; Supplement K to the Project Manual, consisting of pages 1 through 5 and identified as the February 1999 Revision; Exhibit L, Supplementary Conditions to the General Conditions of the Contract for Construction, consisting of pages 2 through 16; and the Technical Specifications, which are separately identified and numbered. As noted in the Call for Bids, drawings are also included in the bid documents. Neel Mechanical, Bayou Mechanical, and Council Contracting submitted bids for Project BR-389 on May 11, 1999, the date on which the bids were opened and the price proposals were read. According to the Bid/Proposal Tabulation form that was posted from May 14 through 19, 1999, Neel Mechanical was the apparent low bidder on the base bid and on the two alternates 5/; Neel Mechanical's base bid and its bid on alternates were within FAMU's budget for the project. Bayou Mechanical submitted the second lowest bid on the base bid and the alternates; Bayou Mechanical was within the budget on the base bid but over budget on the alternates. No recommended award or intent to award was indicated on the Bid/Proposal Tabulation form. Shortly after the bids were opened, several issues were raised with respect to the bid process. First, the FAMU staff discovered that Neel Mechanical had failed to affix its corporate seal to the signature page of the bid Proposal Form and to the Bid Bond that was part of the bid submission. Second, York International Company ("York") sent via facsimile on May 11, 1999, a letter advising FAMU's Office of Facilities Planning and Construction that York intended to protest the bid. This letter raised the third issue: Of the two manufacturers identified in the project specifications, York and The Trane Company ("Trane"), only Trane manufactured a chiller that could meet the project specifications. Fourth, Mark A. Daughtery, a project manager for Bayou Mechanical, sent a letter dated May 14, 1999, to Craig Allen at Bosek, Gibson advising him that Bayou Mechanical intended to file a formal protest on Project BR-389 and identifying two issues of concern to Bayou Mechanical: Neel Mechanical's failure to affix its corporate seal to its bid submission and "the Chiller being sole sourced to Trane Company." Each of these issues is discussed in detail below. Corporate Seal The Instructions to Bidders contained in the Project Manual provide: B-16 Preparation and Submission of Bids Each Proposal shall be submitted on the form contained in the Project Manual and bid prices shall be indicated thereon in proper spaces, for the entire Work and for all Alternates. (See B-8) In the event of a discrepancy in the bid amount on the Proposal between the numeric and written quotes, the written amount will govern. Each Proposal must give the full business address of the Bidder and state whether it is an individual, corporation or partnership. Proposals by a corporation must be signed with the legal name and seal of the corporation followed by the name of the state of its incorporation and the manual signature and designation of an officer, agent or other person authorized to bind the corporation. (Emphasis added.) When it was submitted on May 11, 1999, Neel Mechanical's bid did not include the impression of its corporate seal on the bid Proposal Form signature page or on the Bid Bond submitted as part of the proposal. After the bid opening, an employee of Neel Mechanical received a telephone call from Henry Swift, FAMU's Project Manager for Project BR-389, in which he advised Neel Mechanical that its bid had not been sealed. This conversation was followed by a request from Mr. Swift, sent via facsimile transmittal to Neel Mechanical on May 13, 1999, requesting a "Letter of Clarification which confirms your status as a corporation licensed to do business in the State of Florida, registered with the Secretary of State, etc. Finally, please be sure to sign and seal your letter with your corporate seal." A letter to Mr. Swift, dated May 14, 1999, was signed and sealed by Robert C. Sullivan, President of Neel Mechanical. The letter was received in FAMU's Office of Facilities Planning and Construction on May 19, 1999. Shortly after Mr. Sullivan sent the May 14, 1999, letter, Neel Mechanical received another telephone call from Mr. Swift in which he advised Neel Mechanical that the seal needed to be physically affixed to the bid Proposal Form. Peter Lang, a project manager employed by Neel Mechanical, had business in Tallahassee, so Mr. Sullivan asked that he take the seal to Mr. Swift's office and affix it to the bid Proposal Form. When Peter Lang arrived at Mr. Swift's office, someone brought out the file and gave him the bid Proposal Form, and he affixed Neel Mechanical's corporate seal to the signature page of the form. Neel Mechanical's corporate seal was not affixed to the Bid Bond, although the seal of the surety company was on the Bid Bond when the bid was submitted. The Bid Bond was part of Neel Mechanical’s bid submission. FAMU verified on May 13, 1999, that Neel Mechanical was authorized to do business in Florida and held the requisite Florida license to perform the work required by the project. Centrifugal chiller specifications and York's letter of "intent to protest" Section 15685-1 of the Technical Specifications included in the Project Manual contains the specifications for the Centrifugal Chillers - Water Cooled to be installed as part of Project BR-389. Those specifications provide in pertinent part: PART 2 - PRODUCTS MANUFACTURERS Available Manufacturers: Subject to compliance with requirements, provide centrifugal chillers from one of the following: Trane Co., The York Int'l. UNIT DESCRIPTION: * * * Refrigerant: Chiller shall be provided with low pressure refrigerant HCFC-123. The size of the chiller specified for Project BR-389 was 2200 tons. 6/ Lane Jackins is the owner of Applied Mechanical Equipment and is a manufacturer's representative for York. He reviewed the technical specifications for the chiller contained in Part II of Section 15685-1 of the Technical Specifications for Project BR-389 and determined that York could not furnish a chiller that met the specifications. York does not manufacture a chiller of 2200 tons that uses R123 refrigerant, although it uses R123 refrigerant in smaller machines up to 750 tons. The equipment manufactured by York in the 2,000-ton range uses R134A refrigerant, which operates at different pressures than R123. The York equipment using R134A refrigerant is of an entirely different design than that using R123 refrigerant. In addition, York does not manufacture a chiller with the voltage required by the project specifications. Three or four days before the bids were to be submitted, either Mr. Sullivan or Mr. Lang spoke with Mr. Jackins about York's providing Neel Mechanical with a price for the chiller. Mr. Jackins responded that York would not submit a price for the equipment because York did not manufacture a chiller that would meet the technical specifications included in the bid documents. The Instructions to Bidders in the Project Manual provide: B-12 Basis for Bidding - Trade Names For clarity of description and as a standard of comparison, certain equipment and materials have been specified by trade names or manufacturers. To insure a uniform basis for bidding, the Bidder shall base the Proposal on the particular systems, equipment or materials specified and approved substitutes as provided in Paragraph 3.19, Substitutes, of the General Conditions. After bids are received, no equipment or materials will be approved as a substitute for the specified product. Paragraph 3.19 of the General Conditions provides: Substitutions Substitutions for a specified system, product or material may be requested of the Architect/Engineer, and the Architect/Engineer's written approval must be issued as an addendum before substitutions will be allowed. All requests for substitutions must be submitted prior to the opening of bids, and approvals shall be granted no less than seven (7) days prior to the bid date. Substitutions requested after that date will receive no consideration. Substitutions are changes in materials, equipment, methods, or sequences of construction, design, structural systems, mechanical, electrical, air conditioning controls, or other requirements of the Drawings or Specifications. (Emphasis in original.) In the portion dealing with "SPECIFICATIONS AND DRAWINGS," Section 15010 of the Technical Requirements, "MECHANICAL REQUIREMENTS," provides as follows: By submitting a bid for equipment or material other than the "Design Basis Equipment" (i.e., that which is shown on the Contract Drawings), the Contractor: Represents that he has personally investigated the proposed substitute product and determined that it is equal or superior in all respects to that specified and complies with all the requirements set forth in Paragraph 3.19 of the General Conditions; Certifies that the cost data presented is complete and includes all related costs under this Contract but excludes costs under separate contracts, and excludes the Engineer's redesign costs, and waives all claims for additional costs related to the substitution which subsequently become apparent; Will coordinate the installation of the accepted substitute, making such changes as may be required for the work to be complete in all respects; and, Certifies that the proposed equipment meets the requirements of the Contract Documents. Neither York nor any prospective bidder on Project BR-389 requested within the time limits specified in Paragraph 3.19 of the General Conditions that a York product be substituted for the chiller specified for Project BR-389. Mr. Lang contacted Craig Allen at Bosek, Gibson a day or two before bids were to be submitted and told Mr. Allen that York was not able to provide a chiller that met the project specifications. According to Mr. Lang, Mr. Allen responded that he "was totally surprised that they [York] didn't have a machine that was going to meet this spec." 7/ Mr. Lang based Neel Mechanical's bid on pricing information it received from Trane, which manufactures a chiller that meets the project specifications. An additional reason Mr. Lang based Neel Mechanical's bid on the Trane equipment was his belief that, all things being equal, FAMU preferred to have Trane equipment installed in Project BR-389 because other chillers installed at FAMU were manufactured by Trane. Mr. Lang believed that the specifications for the chiller had been deliberately drawn to require use of Trane equipment. In a letter dated May 11, 1999, the day the bids for Project BR-389 were submitted and opened, Mr. Jackins notified FAMU's Office of Facilities Planning and Construction that York intended to protest the bid on Project BR-389. Mr. Jackins stated in the letter: The chiller as specified is a flat specification. There is only one manufacturer that will meet the criteria as spelled out in the contract documents. This is not in the best interest of the University System of Florida or the State of Florida. An official protest outlining all the proprietary items will be forthcoming. The letter was sent via facsimile on May 11, 1999, prior to the time the bids were opened. Mr. Jackins believed that the "flat specification" was not in the best interest of the university because it precluded competitive pricing for the chiller. Mr. Sullivan learned on May 11 or May 12, 1999, that York intended to file a bid protest. Believing that Neel Mechanical would be awarded the contract as the apparent low bidder, Mr. Sullivan met with Mr. Jackins and several employees of Neel Mechanical, including Greg Lang, at which time Mr. Sullivan proposed an alternative to York's filing a bid protest. Mr. Sullivan told Mr. Jackins that, in his opinion, the situation could best be handled through a meeting between Neel Mechanical, Mr. Jackins, Mr. Houston, and the project engineers. According to Mr. Sullivan's plan, Mr. Jackins could present York's pricing, and FAMU, with the engineers’ assistance, could decide if they wanted to switch from the equipment specified in the bid documents to York equipment. If FAMU agreed to accept the York equipment, then, if it were awarded the contract, Neel Mechanical would purchase the York equipment rather than the Trane equipment Neel Mechanical had included in its proposal. After some discussion, Mr. Jackins agreed with Mr. Sullivan's proposed solution. Post-bid activity from the perspective of Neel Mechanical Immediately after the bids were opened, Craig Allen, an employee of Bosek, Gibson telephoned Mr. Lang and asked if Neel Mechanical was still happy with its bid. According to Mr. Lang, Mr. Allen stated that "this is a standard practice of mine on bid day to call the apparent low bidder and just make sure that they haven't found some colossal error in their math or whatever that made them low." 8/ Mr. Lang told Mr. Allen that Neel Mechanical was still happy with its bid. After this conversation, Mr. Lang waited for the letter from FAMU awarding the contract to Neel Mechanical. He was not concerned that the award was not made immediately because, in his experience, some time always passed between bid opening and the time the winning bidder received the contract. However, in anticipation of the award of the contract, Neel Mechanical proceeded to talk with subcontractors, to start scheduling the project, and to line up equipment that it would need to purchase for work on the project. Neel Mechanical employees also made several visits to the site of the project. At some point after the bids were opened, Mr. Sullivan heard that the procurement officials at FAMU were discussing with FAMU's legal department the issues of Neel Mechanical's failure to affix the corporate seal to its bid and the ramifications of York’s threatened bid protest. Mr. Sullivan responded by telephoning the office of FAMU's general counsel. He spoke with Faye Boyce about these issues and told her that he considered his failure to affix the corporate seal to Neel Mechanical's bid to be insignificant. He also advised her that he had worked out an arrangement with the representative of York whereby York would withdraw its protest and Neel Mechanical would talk with the engineers about the York chiller so a decision could be made whether they wanted to use the York equipment or stay with the Trane equipment which met the project specifications. In a subsequent telephone conversation with Ms. Boyce, Mr. Sullivan received the impression that she had looked into the issues he had raised in their previous telephone conversation. Mr. Sullivan could not recall Ms. Boyce's exact words, but had the impression from their conversation that the contract award to Neel Mechanical had been approved and that confirmation would be sent out shortly. At some point after Mr. Sullivan's conversation with Ms. Boyce, Greg Lang telephoned Henry Swift to find out the status of the contract award. Mr. Swift told Mr. Lang that, in Mr. Lang's words, "the problem had been reviewed and found to be insignificant, and . . . that the letter of intent to award had already been made." 9/ According to Mr. Lang, Mr. Swift told him that FAMU would notify the bidders of the intent to award the contract to Neel Mechanical. On the basis of this conversation, Mr. Lang believed that Neel Mechanical would receive a letter "just any day." When Neel Mechanical did not receive a letter, Mr. Lang telephoned Mr. Swift again. According to Mr. Lang, Mr. Swift stated that he did not know why the matter was being held up. After this second conversation with Mr. Swift, Mr. Lang telephoned Mr. Houston several times but did not receive a return call. Mr. Lang then wrote a letter to Mr. Houston, dated July 9, 1999, in which he inquired about the status of the contract award: It has now been almost two months since you received bids for this project, and as the low bidder we have still not received notification of your intent to award. We have had several telephone conversations with the attorney representing the regents in this matter, and we were lead [sic] to believe that we would have received information before this time. Please review this matter and call us. If there are outstanding issues which concern you, we would like to know about them and work with you to get them resolved. Post-bid activity from the perspective of FAMU Mr. Houston and members of his staff considered the omission of the corporate seal to be a minor deficiency in Neel Mechanical's bid proposal. Nonetheless, even though Neel Mechanical had been allowed to seal the bid Proposal Form, Mr. Houston asked FAMU's Office of General Counsel to conduct research and determine if the deficiency was one that could be waived. Mr. Houston was not involved in drawing up the technical specifications for Project BR-389; rather, he relied on the project engineers to be familiar with the products to be used in the project. Mr. Houston advised the project engineers that he wanted a competitive bid, and, because the chiller was a major component of the project, he instructed the engineers to prepare specifications that could be met by equipment produced by at least two manufacturers. In a letter dated May 18, 1999, Craig Allen, the engineer at Bosek, Gibson who prepared the specifications for Project BR-389, notified Mr. Houston that he was not aware until the "notice of protest" was received from York that York could not provide a chiller of the required capacity which used R123 refrigerant. Mr. Allen advised Mr. Houston that Mr. Jackins, the York representative, had indicated that he wanted to meet with Mr. Allen to discuss York's chiller selections for the project. A recommendation that the contract be awarded to Neel Mechanical was signed on June 8, 1999, by Phyllis Nottage, the Assistant Director of FAMU's Office of Facilities Planning and Construction; on June 10, 1999, by Mr. Houston; on June 14, 1999, by Louis Murray, an Associate Vice President of FAMU; and on June 14, 1999, by Robert Carroll, a Vice President of FAMU with supervisory authority over the Office of Facilities Planning and Construction. The recommendation was contained in a document entitled "Award of Construction Contract," which provided as follows: On May 11, 1999, bids were received for the above-referenced project within the approved budget for the Base Bid and Alternates One (1) through (2), in the total amount of $3,996,400. The requirements for the Minority Business Enterprise Plan as set forth in the project specifications have been satisfied by the Contractor. The consulting Architect/Engineer and the University Facilities Planning and Construction Office recommend the award of this contract to Neel Mechanical Contractors, Inc. President Humphries signed the Award of Construction Contract on June 17, 1999. The preparation and signing of the Award of Contract form and the preparation of the Letter of Intended Decision were part of the bid review process, but Mr. Houston considered them preliminary, without effect until the final decision on the contract award was made and the bidders were formally advised of FAMU's intended decision with respect to the award of the contract. On June 21, 1999, Mr. Houston received a telephone call from Kenneth Ogletree, Director of the Board of Regents’ Office of Facilities Planning, 10/ in which Mr. Houston was advised that the Board of Regents had received an inquiry from a legislator in reference to Project BR-389 and requesting that Mr. Houston prepare a response to the legislator's inquiry. Mr. Ogletree sent Mr. Houston, via facsimile on June 21, 1999, a copy of a letter dated May 28, 1999, from Carey Huff, President of Bayou Mechanical, to Durell Peaden, a member of the Florida House of Representatives and a State Representative from District In the letter, Mr. Huff complained that Neel Mechanical, although apparent low bidder for Project BR-389, had failed to seal the bid Proposal Form and the Bid Bond and that, therefore, Neel Mechanical's bid was non-responsive. Mr. Carey requested that Representative Peaden contact FAMU so that Bayou Mechanical would be awarded the contract for the project as lowest responsive bidder. Mr. Carey stated in his May 28, 1999, letter to Representative Peaden that the college had refused to allow Bayou Mechanical to examine Neel Mechanical's bid but that Mr. Houston had informed them that Neel Mechanical had failed to seal its bid properly. 11/ Mr. Ogletree also sent Mr. Houston, via facsimile on June 21, 1999, a copy of a letter from Representative Peaden to Dr. Adam W. Herbert, Chancellor of the State University System. In his letter, Representative Peaden asked that Dr. Herbert look into the matter and "see that all equity was followed in the bid process." In response to the Board of Regents' request that he respond to Representative Peaden's inquiry, Mr. Houston prepared a letter dated June 22, 1999. In this letter, which was directed to Mr. Ogletree, Mr. Houston stated that FAMU wished to award the contract for Project BR-389 to Neel Mechanical as the low bidder on the project. Mr. Houston stated that FAMU considered Neel Mechanical's failure to affix the corporate seal on the bid Proposal Form and the Bid Bond to be a minor discrepancy. Mr. Houston further stated that FAMU's Office of General Counsel agreed with the conclusion regarding the corporate seal issue and recommended that the contract be awarded to Neel Mechanical. Finally, Mr. Houston advised Mr. Ogletree that President Humphries had signed the "Award of Construction Contract" form and that Mr. Houston's office was preparing "Letters of Intended Decision" to be sent to the bidders. The final decision on the contract award had not been made on June 10, 1999, when Mr. Houston signed the recommendation that the contract for Project BR-389 be awarded to Neel Mechanical, nor had it been made on June 22, 1999, when Mr. Houston wrote his letter to Mr. Ogletree. Rather, on June 22, 1999, the issues raised with respect to the bid process for Project BR-389 were still being reviewed by Mr. Houston and his staff and by FAMU's Office of General Counsel. The decision to reject all bids on Project BR-389 was made on June 24, 1999. On that date, Mr. Houston met with Vice President Murray, FAMU's attorney, and the Assistant Director of the Office of Facilities Planning and Construction, and the issues relating to the bidding process for Project BR-389 were reviewed. Mr. Houston identified these issues as Neel Mechanical's failure to seal its bid Proposal Form and its Bid Bond; potential protests from York and from Bayou Mechanical; and the problem relating to the technical specifications for the chiller. Of these issues, Mr. Houston considered the most serious the fact that, of the two manufacturers listed in the bid specifications, only Trane could provide the chiller for Project BR-389. The chiller was a major part of the project, and Mr. Houston wanted at least two sources for the chiller in order to encourage competition so that FAMU would get the lowest possible price for the project. Mr. Houston was also concerned that the specifications for the chiller created a de facto "sole source" bid and that the bid solicitation would, therefore, be illegal because FAMU didn't satisfy the statutory requirements necessary for it to specify that the chiller be purchased from a sole source. 12/ FAMU's attorney advised the participants at the June 24, 1999, meeting that the legal department had found no precedent within the State University System for waiving the requirement in the bid documents that the bid Proposal Form and the Bid Bond be sealed with the bidder's corporate seal. The participants at the meeting considered all of the outstanding issues and decided that it would be in the best interests of FAMU to reject all bids submitted on May 11, 1999, for Project BR-389. After the decision to reject all bids was made, Mr. Houston marked an "X" through the Award of Construction Contract form signed by President Humphries, and he prepared letters notifying the bidders of the intent to reject all bids for Project BR-389. Neel Mechanical's bid protest In a letter to Neel Mechanical dated July 6, 1999, Mr. Houston stated: Bids on the above referenced project were opened May 11, 1999. However, we regret to inform you that all Bids have been rejected as in the best interest of the University. This project is presently being re-advertised in the Florida Administrative Weekly. The University apologizes for the time it has taken to reach this decision. We trust that you will cooperate with our course of action and look forward to receiving a proposal from you at the next opening. Thanks for your continued interest in the State University System's Construction Program. The envelope containing Mr. Houston's July 6, 1999, letter was post-marked July 9, 1999, and the letter was received by Neel Mechanical on Tuesday, July 13, 1999. The Instructions to Bidders in the Project Manual provide: Rejection of Bids The Owner reserves the right to reject any and all bids when in the opinion of the Owner such rejection is in the best interest of the Owner. Paragraph B-1 of the Instructions to Bidders provides that the Board of Regents is the owner of the project. On July 13, 1999, after Neel Mechanical received the letter from Mr. Houston notifying it that all bids on Project BR- 389 had been rejected, Mr. Sullivan and Greg Lang went to Mr. Houston's office to urge him to rescind the decision and award the contract to Neel Mechanical. Mr. Sullivan told Mr. Houston that they felt that the issue regarding the corporate seal was insignificant. At this time, Mr. Sullivan also told Mr. Houston that he and York had reached an agreement whereby York would withdraw its protest and Neel Mechanical would present the York product to the University and let the University decide if it wanted to go with the Trane chiller or switch to a York product. Mr. Sullivan thought that Mr. Houston was sympathetic to Neel Mechanical but that the decision had been made by the administration and the legal department. Mr. Sullivan also got the impression that the decision to reject all bids was based on the corporate seal issue. On July 13, 1999, Neel Mechanical hand-delivered its Notice of Intent to Protest Bid to Samuel J. Houston, Director of the Office of Facilities Planning and Construction at Florida A&M University and to FAMU's Office of General Counsel. There is no dispute that the Notice of Intent to Protest Bid was actually received in Mr. Houston's office on July 13, 1999. On July 23, 1999, Neel Mechanical hand-delivered its Formal Written Protest and Petition for Formal Administrative Proceedings to Sam Houston, Director, Florida A&M University, Facilities Planning Department, Plant Operations Facility, Building A, Room 100, 2400 Wahnish Way, Tallahassee, Florida 32307 and to FAMU's Office of General Counsel. Also on July 23, 1999, a copy of the Formal Written Protest and Petition for Formal Administrative Proceedings was sent by United States Mail to the Board of Regents, Office of General Counsel, 325 West Gaines Street, Suite 1454, Tallahassee, Florida 32399-1950. There is no dispute that the Formal Written Protest and Petition for Formal Administrative Proceedings was actually received in Mr. Houston's office on July 23, 1999. The Instructions to Bidders in the Project Manual dated October 16, 1989, provide: Bid Protest To be considered, a bid protest must be received by the Director, Capital Programs, Florida Board of Regents, 1601 Florida Education Center, 325 West Gaines Street, Tallahassee, Florida 32399-1950, as provided in Section 120.53, Florida Statutes. Failure to file a notice of protest in this manner shall constitute a waiver of the Bidder's right to proceedings under Chapter 120, Florida Statutes. * * * B-26 Special Conditions Bidders shall be thoroughly familiar with the Special Conditions and their requirements. (Emphasis added.) Supplement J to the Project Manual, consisting of pages 1 through 11 and dated February 13, 1996, provides in pertinent part: (This supplement revises portions of the Project Manual for State University System projects dated October 16, 1989, and supersedes any other previously issued supplements related to the referenced topics.) Revise the Instructions to Bidders Section of the Project Manual as Follows: * * * Revise Paragraph B-22, Bid Protest, to read as follows: B-22 Bid Protest Any person who is affected adversely by the Board of Regents decision or intended decision shall file with the Associate Vice Chancellor, Capital Programs, Florida Board of Regents, 1602 Florida Education Center, 325 West Gaines Street, Tallahassee, Florida 32399-1950, a notice of protest in writing within 72 hours, excluding Saturday, Sunday, and State legal holidays, after receipt of the bidding documents if the protest is directed toward the bidding conditions or after the notice of the Board of Regents decision or intended decision on contract award or bid rejection if the protest is directed toward contract award or bid rejection. Thereafter, a formal written protest by petition in compliance with Section 120.53(5), and Section 120.57, F.S., must be filed with the Associate Vice Chancellor, Capital Programs, Florida Board of Regents, 1602 Florida Education Center, 325 West Gaines Street, Tallahassee, Florida 32399-1950, within ten (10) days after the date the notice of protest was filed. Failure to file a timely notice of protest of [sic] failure to file a timely formal written protest petition shall constitute a waiver of protest proceedings. Any protest filed prior to receipt of the notice of the Board of Regents decision or intended decision will be considered abandoned unless renewed within the time limit provided for protests. (Emphasis added.) Supplement K to the Project Manual, consisting of pages 1 through 5, provides in pertinent part: SUPPLEMENT TO PROJECT MANUAL ISSUED BY FLORIDA A&M UNIVERSITY REGARDING PARAGRAPH B-26, SPECIAL CONDITIONS (February 1999 Revision) B-26 SPECIAL CONDITIONS - This supplement modifies paragraph B-26 by adding and clarifying bidding requirements and instructions. * * * PROTEST PROCEDURES: This paragraph supersedes the paragraph (No. B-22) under the general terms and conditions whereby the notice of intended protests or written formal protests including bonding requirements from bidders must be submitted to: Mr. Sam Houston, Director, Florida A&M University, Facilities Planning Department, Plant Operations Facility, Building A, Room 100, 2400 Wahnish Way, Tallahassee, FL 32307. A bid tabulation with the recommended award(s) will be posted at the address indicated in Paragraph B-26, sub- paragraph 6 (Posting of Bid Tabulation). Any notice of protest or formal written protest to the award or intended award which is filed before the bid tabulation posting is null and void. To be considered, a notice of protest or formal written protest must be filed within the time limits set forth in Section 120.57(3)(b), Florida Statutes. Any notice of protest or formal written protest to the specifications issued by the University must be filed within the time limits set forth in Section 120.57(3)(b), Florida Statutes. Any notice of protest or formal written protest to any amendment issued by the University must be filed within the time limits set forth in Section 120.57(3)(b), Florida Statutes. (Emphasis added.) The instructions regarding the filing of bid protests in Supplement K supersede the instructions in Supplement J, which is dated February 13, 1996, and in the Instructions to Bidders in the Project Manual, which are dated October 16, 1989. Summary The evidence presented by Neel Mechanical is sufficient to establish that it timely filed its Notice of Intent to Protest and its Formal Written Protest and Petition for Formal Administrative Proceedings by hand-delivering the documents to Mr. Houston, at his office on the FAMU campus. The evidence presented by Neel Mechanical is not sufficient to establish with the requisite degree of certainty that FAMU acted fraudulently, arbitrarily, illegally, or dishonestly in deciding that it was in the best interest of FAMU to reject all of the bids submitted on May 11, 1999, for Project BR-389. First, FAMU's concerns that, by inadvertently including a technical specification that could be met by only one manufacturer, it had limited competition with respect to the chiller to be used in Project BR-389 and had inadvertently put out an illegal "sole source" specification were legitimate concerns. Mr. Houston instructed the engineer who prepared the technical specifications that he wanted the specifications drawn so that at least two manufacturers could provide the product, and the engineer prepared specifications relating to the "available manufacturers" which clearly contemplated that a chiller meeting the technical specifications could be provided by both York and Trane. FAMU did not act arbitrarily when it considered as one factor underlying the decision to reject all bids the lack of precedent in the State University System for waiving the requirement that the bid Proposal Form and Bid Bond carry the corporate seal of a corporate bidder. The evidence submitted by Neel Mechanical is not sufficient to establish with the requisite degree of certainty that the corporate seal issue was ultimately the only or even the major factor on which FAMU's decision to reject all bids was based. Mr. Houston identified the possibility that bid protests would be filed by York and by Bayou Mechanical as factors which FAMU considered in deciding to reject all bids. Nonetheless, the evidence taken as a whole permits the inference that the focus of the concern about the potential bid protests was not on avoiding the protests but on the validity of the issues raised by York and Bayou Mechanical. Accordingly, FAMU did not act arbitrarily when it considered these potential bid protests as one factor contributing to the decision to reject all bids. The evidence presented by Neel Mechanical is not sufficient to establish that the "Award of Contract" form executed by President Humphries on June 17, 1999, or Mr. Houston’s June 22, 1999, letter to Mr. Ogletree bound FAMU to award the contract to Neel Mechanical or that the subsequent decision to reject all bids defeated the purpose of the competitive bidding process.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that Florida Agricultural and Mechanical University enter a final order dismissing the Formal Written Protest and Petition for Formal Administrative Proceedings filed by Neel Mechanical Contractors, Inc., and denying Neel Mechanical's Motion for Assessment of Attorney's Fees, insofar as it is based on the provisions of Section 120.595, Florida Statutes. Based on the foregoing Findings of Fact and Conclusions of Law, Neel Mechanical's Motion for Assessment of Attorney's Fees, insofar as it is based on the provisions of Section 120.569(2)(e), Florida Statutes, is denied. DONE AND ENTERED this 12th day of November, 1999, in Tallahassee, Leon County, Florida. PATRICIA HART MALONO Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 12th day of November, 1999.

Florida Laws (11) 120.53120.569120.57120.595120.6814.021255.04255.0516255.0525255.24890.206 Florida Administrative Code (8) 28-106.1046C-14.0026C-14.0186C-14.0206C-14.0216C-14.0236C3-6.0046C3-6.007
# 5
OFFICE SYSTEMS CONSULTANTS vs. DEPARTMENT OF HIGHWAY SAFETY AND MOTOR VEHICLES, 87-000304BID (1987)
Division of Administrative Hearings, Florida Number: 87-000304BID Latest Update: Apr. 10, 1987

The Issue The following issues were raised in the challenge of the award of the bid: Did Harris/3M fail to comply with Special Condition 28 of the Invitation to Bid, which required each bidder to provide references from two customers having similar equipment? Did the Department request a demonstration of the bid equipment under Special Condition 15? If such a demonstration was requested, did Harris/3M comply with the request? Were the machines bid by Harris/3M available under terms of General Condition 4(d)? Did the machines bid by Harris/3M comply with General Condition 4(f) requiring that the equipment bid carry the Underwriter's Laboratory listing? In response to Harris/3M's Motion for Directed Verdict on issue number 5, the Hearing Officer granted the motion on a finding that no evidence had been presented on this issue by the Petitioner. The Petitioner's compliance with the specifications was not at issue.

Findings Of Fact On or about December 15, 1986, the Department issued and advertised its Invitation to Bid 3162-86 related to the acquisition of 15 microfilm reader/printers for use in searching, reading and printing motor vehicle documents which had been microfilmed by the Department of Highway Safety. Microfilm reader/printers are essentially units of hardware into which cartridges of microfilm are inserted and the microfilm is passed through a camera which reflects the images of the microfilm onto a screen from which information can be read and copies printed. The Invitation to Bid required that the equipment must have a "controller," a device for automatically locating specific microfilm documents by the use of coded information or "blips" on the film. On or about January 5, 1987, responses to the Department's bid were submitted by Petitioner OSC and Intervenor, Harris/3M, together with bids from other bidders whose bids are not an issue in these proceedings. All bids were opened on January 5, 1987. The equipment bid by Harris/3M was the Model MFB1100 Reader/Printer with a "page search" kit or controller. Special Condition 28 of the Invitation to Bid states: "28. REFERENCES The bidder shall supply with his bid the names, addresses and telephone numbers of two references for whom the bidder has previously provided similar equipment being bid. If the bidder is unable to provide satisfactory references to the Department, the Department may, at its discretion, reject the bidder's bid if it determines that a responsive offer in full compliance with the bid speci- fications and conditions was not submitted. Failure to supply the references as required may result in rejection of the bid." (e.s.) Harris/3M provided two references in satisfaction of Special Condition Both of the references had versions of the Model MFB1100; however, neither of the references had the "controller" or page search kit, which was called for in the Invitation to Bid. Special Condition 28 was drafted by Merelyn Grubbs. According to Ms. Grubbs, the purpose of this requirement was to assure the Department that the bidder was responsible. "Similar" equipment is sufficient to assess the bidder's responsibility based upon machines made by the same manufacturer which performed essentially the same function. The MFB1100 without a page search kit is a "similar" machine. The two references provided were sufficient. Special Condition 15 states: DEMONSTRATIONS After opening of bid and prior to award of bid, the apparent low responsive bidder may be required to demonstrate to the Division of Administrative Services the equipment he proposes to furnish. If requested, a "working model" of the equipment bid and to be supplied in compliance with these specifications must be demonstrated in Tallahassee, Florida, within seven (7) calendar days from receipt of notification. If apparent low responsive bidder cannot successfully execute the demonstration, the Department shall revert to the next low responsive bidder and request demon- stration, continuing through the list of responsive bidders until a successful demonstration is achieved, the list of responsive bidders is exhausted or it is in the State's best interest to terminate the bid process. Demonstrations to be furnished at no expense to the Department." On January 7, 1987, Mr. Ray Boetch, the supervisor of the division within the Department of Highway Safety where the reader/printers would ultimately be used, wrote a memorandum to Merelyn Grubbs requesting that a demonstration be made on the Harris/3M Model MFB1100 Reader/Printer prior to the awarding of the bid. Mr. Boetch also discussed the matter with Ms. Grubbs indicating his primary concern was verifying the quality of the prints produced by the machine and whether it could print half pages. Ms. Grubbs spoke with Nick Vuillemot of Harris/3M about a demonstration of the equipment in Tallahassee. In these discussions, Harris/3M offered to fly representatives of the Department to St. Paul, Minnesota, the home office of the manufacturer, for a demonstration of the equipment. This was because Harris/3M had only two prototypes of the equipment and it was more economical for Harris/3M to fly Department personnel to Minnesota for purposes of the demonstration than to disassemble, ship to Tallahassee and reassemble the prototype for a demonstration. The Department declined to accept Harris/3M's offer. The Department accepted instead a demonstration of a Model MFB1100 without the controller or page search kit at the Division of Elections in Tallahassee, Florida. The MFB1100 without controller does not meet the specifications in the Invitation to Bid. The "controller" or page search kit is of modular construction in the MFB1100, which can be ordered with or without the controller or page search kit. However, the bid specifically calls for a reader/printer with a page search device. Following the demonstration of the MFB1100 without page search capability, the Department officially posted its bid tabulations on January 12, 1987, designating Harris/3M as the low and responsive bidder and OSC was the next low and responsive bidder. Item 4 (d). Conditions and Packaging of the General Conditions of the Invitation to Bid provides as follows: It is understood and agreed that any item offered or shipped as a result of this bid shall be new, current standard production model available at the time of bid. (e.s.) Item 18. Delivery Schedule of the special conditions required delivery of the items bid within 30 days of the bid award or, in the alternative, a substitute item acceptable to the Department at no cost to the Department. The bid submitted by Harris/3M certified that delivery of all 15 units would be delivered within 30 days after receipt of a purchase order. Although the Harris/3M Model MFB1100 Reader/ Printer without page search had been on the market for a number of months prior to the issuance of the Invitation to Bid, the Model MFB1100 with page search had not been authorized for sale by the manufacturer until late November 1986. At the time demonstration was requested, only two prototypes existed of the MFB1100 with page search capability. As of the date of the hearing on February 11, 1987, no Model MFB1100 Reader/Printers with page search capability had been installed in any customer location within the United States. The Petitioner did not present any evidence to support its claim that the MFB1100 Reader/Printer with page search did not have a UL listing.

Florida Laws (4) 120.53287.032287.042672.205
# 6
PAC-TEC, INC. vs DEPARTMENT OF MANAGEMENT SERVICES, 95-006011BID (1995)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Dec. 13, 1995 Number: 95-006011BID Latest Update: Feb. 16, 1996

The Issue Whether Petitioner's bid protest should be dismissed for failure to state with specificity the underlying facts of the protest or facts sufficient to form a basis for a bid protest.

Findings Of Fact The Petitioner filed a bid protest of Invitation To Bid (ITB) No. 13- 550-002-A for raised pavement markers. Petitioner was disqualified from award of the bid due to the failure to meet the requirement that the products bid must be on the Florida Department of Transportation Qualified Products List at the time of the bid opening. Petitioner's Formal Protest contains no specific allegations of fact and as such is not in conformance with Rule 60Q-2.004(3), Florida Administrative Code, and Section 120.53(5)(b), Florida Statutes. On December 20, 1995, the Hearing Officer, sua sponte, entered an order requiring Petitioner to file an amended Formal Protest stating with specificity the facts and law which form the basis for its protest. The document filed by Petitioner in response to the order in essence: States there are on-going discussions with the Florida Department of Transportation, ("FDOT") District V Secretary and the Florida Department of Transportation Secretary that should preempt any further litigation. Complains that Section 316.0745(4), of the Florida Statutes is being improperly interpreted by FDOT so that the State is being forced to purchase a highway safety product at a cost far in excess of prudent purchasing practices. Alleges that the Petitioner meets all the qualifications of laboratory and field testing required by the Florida Department of Transportation Materials Laboratory . . . The formal protest filed in this case by Pac-Tec does not provide such notice to the Department of Management Services. Therefore the Department of Management Services cannot prepare an adequate defense to the protest. The response does not cure the deficiencies in the formal protest.

Recommendation Based upon the findings of fact and the conclusions of law, it is, RECOMMENDED: That the Department of Management Services issue a Final Order dismissing the Formal Protest filed by Petitioner. DONE and ENTERED this 24th day of January, 1996, in Tallahassee, Leon County, Florida. DIANE CLEAVINGER, Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 24th day of January, 1996. COPIES FURNISHED: Cindy Horne, Esquire Department of Management Services 4050 Esplanade Way, Suite 260 Tallahassee, Florida 32399-0950 David H. Smith, Esquire Post Office Box 279 Astor, Florida 32101 Mary M. Piccard, Esquire Cummings, Lawrence & Vezina, P.A. Post Office Box 589 Tallahassee, Florida 32302-0589 William H. Linder, Secretary Department of Management Services 4050 Esplanade Way Tallahassee, Florida 32399-0950 Paul A. Rowell, Esquire Department of Management Services 4050 Esplanade Way Tallahassee, Florida 32399-0950

Florida Laws (3) 120.53120.57316.0745 Florida Administrative Code (1) 60A-1.006
# 7
J C AND C ASSOCIATES, INC. vs DEPARTMENT OF LOTTERY, 94-003955BID (1994)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Jul. 18, 1994 Number: 94-003955BID Latest Update: Mar. 13, 1996

The Issue Whether Respondent has acted acted fraudulently, arbitrarily, capriciously, illegally, or dishonestly with regard to the intended award of ITB 93/94-040- LOT/P.

Findings Of Fact By correspondence filed July 18, 1994, this bid protest was referred to the Division of Administrative Hearings from the Department of Lottery for the conduct of formal proceedings pursuant to Section 120.53(5), Florida Statutes. The formal bid protest document consists solely of a single page letter signed by Petitioner's president, C. Whitside-Curry, basically stating that the letter is to serve as Petitioner's formal written protest to Respondent's "Notice of Award - Notice of Non-Responsiveness - ITB 93/94-040-LOT/P - Invitation To Bid for Painting the Interior of the Lottery Central Building. Final hearing in the matter was scheduled for August 2, 1994, in compliance with requirements of Section 120.53(5)(e), Florida Statutes, that bid protests be set for hearing within 15 days absent stipulation of the parties waiving that statutory time frame. By motion filed July 29, 1994, counsel for Petitioner sought a continuance of the final hearing for a period of one week. Counsel had just been retained by Petitioner. As reflected in Petitioner's motion, counsel's request for a one week delay was acceptable to counsel for Respondent, provided that: the 30 day time frame governing issuance of recommended orders in bid challenge cases was not waived. that deposition of a principal of Petitioner, C. Whitside-Curry, be held on August 3, 1994 at 11:30 a.m. and that certain documents also be produced. A telephone hearing on Petitioner's continuance motion was held on August 1, 1994, to clarify the hearing officer's understanding that a one week continuance of the final hearing would not subtract a period of one week from the 30 day time frame following the final hearing within which to prepare a recommended order in the case. Thereafter the motion was granted and final hearing rescheduled, as agreed in the telephone conference, for August 9, 1994, one week after the initial hearing date. By notice filed on August 3, 1994 (transmitted to Petitioner's counsel by facsimile transmission on July 29, 1994), Respondent documented the agreed upon deposition of C. Whitside-Curry and documents to be produced. By motion filed on August 3, 1994, subsequent to Respondent's notice, Petitioner's counsel sought a further continuance of the final hearing and noticed the unavailability of Petitioner's principal, C. Whitside-Curry, for the scheduled deposition on August 3 or the final hearing scheduled for August 9, 1994. By motion filed on August 3, 1994, subsequent to Petitioner's second motion for continuance, Respondent moved for imposition of sanctions, including the dismissal of the bid protest on the basis that Petitioner had not complied with conditions agreed to by the parties as a part of the one week continuance, i.e., C. Whitside-Curry did not appear for deposition and documents were not produced. The motion further related that Respondent's notice of the deposition and request to produce documents (filed on August 3, 1994) had been transmitted, as noted above, to Petitioner's counsel by facsimile transmission on July 29, 1994. In the course of telephone conference with the parties on August 8, 1994, Petitioner's counsel agreed to payment of costs related to court reporter expense incurred by Respondent at the deposition where Petitioner's principal failed to appear. Respondent's counsel refused to consent to further continuance of the final hearing and Petitioner's request for a second continuance was denied. At final hearing, consideration was given to an Petitioner's Amended Second Motion For Continuance. The motion differed from previous motions to the extent that an attached copy of a letter dated April 21, 1994, appeared to indicate that a mediation meeting in another legal proceeding required the Petitioners' presence in Tampa, Florida, on the afternoon of August 9, 1994. No direct admissible evidence of Petitioner's inability to attend the hearing was presented. Upon denial of the amended motion for continuance, counsel for Petitioner announced that he could not go forward.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that the formal bid protest filed in response to Respondent's intent to award ITB 93/94-040-LOT/P, be DISMISSED. DONE AND ENTERED this 10th day of August, 1994, in Tallahassee, Leon County, Florida. DON W. DAVIS Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 10th day of August, 1994. COPIES FURNISHED: Curley R. Doltie, Esquire 1103 Hays Street P.O. Box 1325 Tallahassee, Florida 32302 Louisa Warren, Esquire Department of Lottery 250 Marriot Drive Capitol Complex Tallahassee, Florida 32399-4011 Marcia Mann Secretary Department of Lottery Capitol Complex Tallahassee, Florida 32399-4002 Ken Hart General Counsel Department of Lottery Capitol Complex Tallahassee, Florida 32399-4011 NOTICE OF RIGHT TO SUBMIT EXCEPTIONS All parties have the right to submit written exceptions to this recommended order. All agencies allow each party at least 10 days in which to submit written exceptions. Some agencies allow a larger period within which to submit written exceptions. You should consult with the agency that will issue the final order in this case concerning their rules on the deadline for filing exceptions to this recommended order. Any exceptions to this recommended order should be filed with the agency that will issue the final order in this case. ================================================================= DISTRICT COURT OPINION ================================================================= IN THE DISTRICT COURT OF APPEAL FIRST DISTRICT, STATE OF FLORIDA J C & C ASSOCIATES, INC., NOT FINAL UNTIL TIME EXPIRES TO FILE MOTION FOR REHEARING AND Petitioner, DISPOSITION THEREOF IF FILED vs. CASE NO. 94-3185 DOAH CASE NO. 94-3955BID DEPARTMENT OF LOTTERY, Respondent. / Opinion filed January 22, 1996. An Appeal from Order of the Department of Lottery. Curley R. Doltie, Tallahassee, for Appellant. Louisa H. Warren of Department of the Lottery, Tallahassee, for Appellee. PER CURIAM. AFFIRMED. ALLEN and KAHN, JJ., and SMITH, SENIOR JUDGE, CONCUR. MANDATE From DISTRICT COURT OF APPEAL OF FLORIDA FIRST DISTRICT To the Honorable Don W. Davis, Hearing Officer Division of Administrative Hearings WHEREAS, in that certain cause filed in this Court styled: J C & C ASSOCIATES, INC., Petitioner, vs. CASE NO. 94-3185 DOAH CASE NO. 94-3955BID DEPARTMENT OF LOTTERY, Respondent. The attached opinion was rendered on January 22, 1996. YOU ARE HEREBY COMMANDED that further proceedings be had in accordance with said opinion, the rules of this Court and the laws of the State of Florida. WITNESS the Honorable E. Earle Zehmer Chief Judge of the District Court of Appeal of Florida, First District and the Seal of said court at Tallahassee, the Capitol, on this 11th day of March, 1996. (SEAL) Jon S. Wheeler Clerk, District Court of Appeal of Florida, First District

Florida Laws (2) 120.53120.57
# 8
UNIVERSAL NETWORK, INC. vs ALACHUA COUNTY SCHOOL BOARD, 91-005356BID (1991)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Aug. 27, 1991 Number: 91-005356BID Latest Update: Nov. 26, 1991

The Issue This cause has been resolved upon Intervenor's Motion to Dismiss for Petitioner's failure to timely file the formal written protest required by Section 120.53(5) F.S. [1990 Supp.] to protest award of Respondent Alachua County School Board's BID 341 "Bid Proposal For Furnishing Monitoring Security Systems" to Intervenor.

Findings Of Fact Request for Bid 341 "Bid Proposal For Furnishing Monitoring Security Systems" dated June 14, 1991 was issued by Respondent Alachua County School Board and received by Petitioner/protestant Universal Network, Inc. on or about that date. The bid-closing date was 1:30 p.m. July 2, 1991. No one challenged or protested the specifications prior to the bid submittal date. Universal Network, Inc. and Crime Prevention Security Systems were the only bidders who timely filed bids on or before June 2, 1991. The request for bid accompanied by bid specifications had notified all potential bidders that School Board personnel also intended to open the bids on July 2, 1991, and stated that "Bid tabulations with recommended awards will be posted . . . on or about the Monday following bid opening, . . ." The request for bid also provided "Failure to file a protest within the time prescribed in Section 120.53(5) Florida Statutes, shall constitute a waiver of proceedings under Chapter 120, Florida Statutes." (HO Exhibit 6) The bids were opened July 2, 1991, and oral communications were made by Respondent's personnel to the effect that Crime Prevention Security Systems would probably be successful since it was low bidder. However, Respondent's personnel delayed posting a formal intent to award on Monday, July 8, 1991 because Petitioner orally announced itself aggrieved by the process. Eight days after the bid opening, on July 10, 1991, Respondent's personnel met with both bidders in an effort to resolve any issue that could result in a formal protest. This meeting was tape recorded by the Petitioner. After this meeting, Petitioner filed a letter dated July 11, 1991 stating that Petitioner "learned" through "verbal notification" as of the July 10 meeting that it would not be awarded the bid, outlining its own prior contract work for the Respondent School Board, attacking the bid specifications, and notifying the Respondent that Petitioner would cease to monitor security under the existing contract at midnight on July 31, 1991. At hearing, Petitioner acknowledged that it did not rely on this July 11, 1991 letter (HO Exhibit 1) as its notice of protest. Nothing was formally decided until, on July 16, 1991, Respondent, through its employee, David C. Hotary, formally posted its intent to award Bid 341 to Crime Prevention Security Systems. On that date, Respondent also wrote and hand-delivered a formal letter-notice of intent to Petitioner's president. That letter provided, in pertinent part: As follow-up to our meeting of July 10, and your letter of July 11, this is to advise that posting of the recommended bid award to crime prevention security systems occurred as of this date and will remain posted for a three day period. Failure to file a protest within the time prescribed in s. 120.53(5), Florida Statutes, shall constitute a waiver of proceedings under chapter 120, Florida Statutes. (Emphasis supplied) (HO Exhibit 2) There is no dispute that Petitioner actually received this written notice of decision or intended decision on July 16, 1991. This procedure complied with Respondent's obligations to provide notice of the award and a window for Petitioner's bid protest under the provisions of Section 120.53(5)(a). F.S. [1990 Supp.] and Respondent's rule (HO Exhibit 5). On July 17, 1991, the Petitioner's president filed with the Respondent a letter bearing that date which provided, in pertinent part, This letter is to inform you that Universal Network, Inc. is now formally protesting BID 341 "Bid Proposal For Furnishing Monitoring Security Systems." We base our protest on unpublished bid variances. (HO Exhibit 3) There is no dispute that this letter was filed with the Respondent within 72 hours "after the posting of the bid tabulation or after receipt of the notice of agency decision or intended decision." It clearly constituted the "notice of protest" contemplated by Section 120.53(5)(b) F.S. [1990 Supp.] and is timely under that statute. Under that statute and pursuant to Respondent's rule, the 10 days for filing the required formal written protest would have run out on July 29, 1991, a Monday, allowing for Saturday and Sunday. On July 24, 1991, five days before the formal written protest was due, Respondent's personnel telephoned the Petitioner's president and a conversation ensued. Upon the representations at formal hearing of Petitioner's president Daniel Boudreau, it is found that this conversation encouraged him to file another letter to the Respondent on July 31, 1991. (HO Exhibit 4) Petitioner's president asserted that Respondent's July 24, 1991 phone call was only to urge him to file a letter setting out his grounds for protest more fully so that the issues between Petitioner and Respondent could be resolved informally. Filing a letter which sets out the grounds for a notice of protest is a fair description of what a formal written protest is supposed to do, and it was Respondent's position that the phone call was to urge Petitioner to file its formal written protest. Whether or not the filing of this July 31, 1991 letter could constitute a means of informal resolution of the bid dispute as asserted by Petitioner is a legal issue and is discussed in the Conclusions of Law, infra, but it is undisputed that Respondent's telephone call of July 24, 1991 actually encouraged Mr. Boudreau to file a more detailed letter and did nothing to discourage filing a formal written protest, which formal written protest is mandatory under the applicable statute and rule. Nonetheless, Petitioner filed nothing whatsoever in writing with the Respondent between July 17, 1991 (the date of the notice of protest) and July 31, 1991. On July 31, 1991, Petitioner filed with the Respondent its letter which provided, in pertinent part: This letter is to inform you that Universal Network, Inc. has formally protested BID 341 "Bid Proposal for Furnishing Monitoring Security Systems." We base our protest on unpublished bid variances. Universal Network, Inc. is now asking for a formal hearing and also will be willing to submit a new bid with the SBAC corrected bid specification. Petitioner's July 31, 1991 letter goes on to compare how Petitioner's bid would be altered as of July 31, 1991 if the original bid specifications had specified or clarified certain items or terms and to show that Petitioner's July 2, 1991 bid price would have been lower if that had been the case. (HO Exhibit 4) Petitioner's July 31, 1991 letter clearly constituted Petitioner's "formal written protest" as contemplated by Section 120.53(5)(b) F.S. [1990 Supp.] and the rule and is untimely under that statute and rule.

Recommendation Upon the foregoing Findings of Fact and Conclusions of Law, it is recommended that the School Board of Alachua County enter a Final Order dismissing the protest/petition of Universal Network, Inc. RECOMMENDED this 19th day of September, 1991, at Tallahassee, Florida. ELLA JANE P. DAVIS, Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 19th day of September, 1991. COPIES FURNISHED: Dale A. Boudreau, President Universal Network, Inc. 1031 NW 6 Street, Suite A-3 Gainesville, FL 32601 Thomas L. Wittmer, Staff Attorney School Board of Alachua County 620 E. University Avenue Gainesville, FL 32601 Robert E. Roundtree, Jr., Esquire 111 SE 1st Avenue Gainesville, FL 32602 Dr. Douglas Magann, Superintendent Alachua County School Board 620 East University Avenue Gainesville, FL 32601

Florida Laws (2) 120.53120.57
# 9
BUY THE SQUARE YARD, INC. vs PALM BEACH COUNTY SCHOOL BOARD, 93-002672BID (1993)
Division of Administrative Hearings, Florida Filed:West Palm Beach, Florida May 17, 1993 Number: 93-002672BID Latest Update: Mar. 31, 1994

Findings Of Fact The Palm Beach County School Board (Respondent) issued an invitation to bid (ITB) on February 16, 1993, requesting bids for the removal, preparation, and installation of carpet-glue down on project SB93C-216T. The ITB provided that all bids were to be submitted by March 31, 1993, at 2:00 p.m., at which time all bids were to be publicly opened. Pertinent sections of the ITB to the case at hand include a section entitled "Invitation To Bid" which provides in pertinent part: AWARDS: In the best interest of the School Board, the Board reserves the right to reject any and all bids and to waive any irregularity in bids received; to accept any item or group of items unless qualified by bidder; to acquire additional quantities at prices quoted on this invitation unless additional quantities are not acceptable, in which case the bid sheets must be noted "BID IS FOR SPECIFIED QUANTITY ONLY." All awards made as a result of this bid shall conform to applicable Florida Statutes. Another section entitled "General Conditions, Instructions and Information for Bidders" provides in pertinent part: 26. Any and all Special Conditions that may vary from these General Conditions shall have precedence. The section entitled "Special Conditions" provides in pertinent part: C. AWARD: Bid will be awarded to the lowest and best bidder meeting specifications, terms and conditions . . . The School Board shall elect to award to a primary and a secondary vendor . . . . * * * N. CONTRACTOR QUALIFICATIONS: The contractor must have at least three years of verifiable experience in the floor covering contracting business. The contractor must have in force the required occupational licenses from Palm Beach County and it's municipalities. All documentation of the above requirements must be submitted with the proposed bid by each bidding contractor. The contractor shall not sub-contract any portion of their work, outlined in this contract, to any person(s) or company, without advance written permission from the Carpentry Supervisor of the Department of Maintenance & Plant Operations. Another section of the ITB entitled "Additional Information" provides in pertinent part: Additional information will not be a determining part of the award of this bid except in the instance where the per square yard prices are too close to determine a clear awardee. In that instance we will look at the optional items in this section as the determining factor. (This usage is also based upon all other factors being equal.) . . . Cost of heavy patching. $ per sq. ft. . . . Cost of heavy patching. $ per sq. ft. . . . By March 31, 1993, eight bids were received. However, only seven bids were considered. Respondent's Department of Contracting & Procurement reviewed the bids. On April 12, 1993, the Department of Contracting & Procurement (Department) posted the bid tabulations, which showed, inter alia, that the apparent lowest bidder was Carpetech at $28,029.61, that the apparent second lowest bidder was Buy the Square Yard (Petitioner) at $32,107.32, and that the apparent highest bidder was Acousti Engineering of Florida (Intervenor). Additionally, the recommendation was that the bid be awarded to the "lowest and best bidder meeting specifications, terms, and conditions" with Carpetech being the "Primary" bidder and Petitioner being the "Secondary" bidder. Moreover, the bid tabulation sheet noted that the "price" of each bid was determined by using a "hypothetical" that was typical of a School Board project. This was the first time that the bidders were aware of a hypothetical being used. Respondent had not used a hypothetical in past bids for this type of work, and it was not included in the bid specifications At first, after the bids were opened, Respondent's Department used the base bid, which excluded any alternate work, to determine the apparent lowest bidder. The calculation showed Intervenor as the apparent lowest bidder at $11.03 sq. yd. and Petitioner as the apparent second lowest bidder at $11.08 sq. yd. Carpetech's base bid was $11.295 sq. yd. A discussion ensued as to whether the bids were "too close"; but, there was no consensus as to the meaning of "too close." However, the Department determined that, taking into consideration the alternate work which would have to be done, Intervenor was not the best bidder. The Department first considered recommending the rejection of all bids and readvertising, but decided upon using a hypothetical which included the base bid and the alternates in the calculations. As a result of using the hypothetical, Carpetech, not Intervenor, was the apparent lowest bidder. However, Carpetech, unlike any other bidder, changed one of the specifications in its bid from the "cost of heavy patching" to the "cost of light patching." Respondent admits that a clerical error had occurred and that particular specification should have been "light" patching, instead of "heavy" patching. Also, Carpetech failed to submit an occupational license with its bid. However, subsequent to the bid opening, Carpetech submitted an occupational license. Like Carpetech, Intervenor also failed to submit an occupational license with its bid. 2/ To the contrary, Petitioner submitted an occupational license with its bid. The occupational license forbade Petitioner to have employees at its location but allowed it to hire outside employees, which meant that it could hire contract labor to perform under the contract of the bid. 3/ Out of the three bidders--Carpetech, Petitioner and Intervenor--only Petitioner is a minority owned business. Initially, when Petitioner began its business in December 1991, it was owned by a minority female and a minority male. Subsequently, for financial purposes, the minority female became the sole shareholder/owner and the minority male became the business consultant (consultant), receiving consulting fees. On or about March 24, 1992, Petitioner was certified as a Minority Business Enterprise (MBE) by Palm Beach County, and on or about March 19, 1992, it was certified as a MBE by Respondent, with the certification effective from May 1992 to May 1993. Petitioner became incorporated in or around April 1992 and again in July 1992 when the minority female became the sole owner. Prior to Petitioner's formation, its consultant had his own flooring business (carpet and tile sales and insulation) for several years. The prior business had financial difficulties which resulted in court judgements against it. Petitioner's sole owner was never involved in the consultant's prior business. She provides Petitioner's financial security, and there have been no court judgments against Petitioner. Respondent's Department was familiar with flooring work of Petitioner's consultant before he became associated with Petitioner. He had performed flooring work for Respondent in the past, which was very satisfied with his work. The Department was not aware of the court judgements against the prior business of Petitioner's consultant. However, even if it was, the judgments would not have had a negative effect on Petitioner in the award process of the current contract. On or about April 14, 1993, Intervenor filed its written protest, which was timely. On or about April 22, 1993, Petitioner filed its written protest, which was timely. On April 28, 1993, Respondent held an informal meeting on the written protests. On May 3, 1993, Respondent's counsel issued its recommendation on the protests, which was to "reject all bids and rebid with new terms and conditions and specifications" in order for all bidders to be given "a fair playing field."

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Palm Beach County School Board enter its final order rejecting all bids on project SB93C-216T and readvertise. DONE AND ENTERED in Tallahassee, Leon County, Florida, this 2nd day of December 1993. ERROL H. POWELL Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 2nd day of December 1993.

Florida Laws (2) 120.53120.57
# 10

Can't find what you're looking for?

Post a free question on our public forum.
Ask a Question
Search for lawyers by practice areas.
Find a Lawyer