Elawyers Elawyers
Washington| Change
Find Similar Cases by Filters
You can browse Case Laws by Courts, or by your need.
Find 49 similar cases
WALES INDUSTRIES, INC. vs. DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES, 87-003317BID (1987)
Division of Administrative Hearings, Florida Number: 87-003317BID Latest Update: Oct. 14, 1987

Findings Of Fact Since 1984 Respondent Department of Health and Rehabilitative Services (hereinafter "the Department") has served as the distributing agency for United States Department of Agriculture surplus foods to be distributed to needy people in the State of Florida. These foods are butter, processed cheese, non-fat dry milk, cornmeal, rice, flour, and honey. The Department contracts with companies in the food storage and distribution business-to store the surplus food and distribute it to emergency feeding organizations. The emergency feeding organizations then distribute the food to needy persons. Each year the Department enters into contracts for various regions within the State. Petitioner Wales Industries, Inc. (hereinafter "Wales"), Intervenor Mid-Florida Freezer Warehouses, Ltd. (hereinafter "Mid-Florida"); and Gulf Cargo Services, Inc. (hereinafter "Gulf Cargo"); have all been awarded contracts with the Department over the years for storage and distribution of the surplus foods in the various regions of the State. On or about June 12, 1987, the Department issued an Invitation for Bid (hereinafter "IFB 87-1") which advised prospective bidders that sealed bids would be opened on July 10, 1987 for a contract for the storage and distribution of the surplus foods for the period of October 1, 1987 to September 30, 1988. A bidder under IFB 87-1 would be required to store the above-described commodities in dry, chilled, and frozen storage. The provider must also be able to ship the commodities under dry, chilled, and frozen conditions to emergency feeding organizations throughout the state. The bid evaluation criteria set forth in Paragraph E of IFB 87-1 provide, in part, as follows: c. The bid will be awarded to the Bidder submitting the lowest delivered price per CWT for dry, cold, and frozen donated foods inclusive for each Region, combination of regions, or statewide as bid. The bid price for pick-up at the Provider's warehouse is informational, but is not a consideration in award of the bid. Paragraph numbered eight of the General Conditions of IFB 87-1 notifies actual or prospective bidders who dispute the reasonableness, necessity, or competitiveness of the terms and conditions therein or of the bid selection or contract award recommendation that they must file a protest within the time prescribed in section 120.53(5), Florida Statutes, or be deemed to have waived their right to do so. IFB 87-1 included an estimate of the number of cases and weights of commodities to be handled by a provider per region. This information was characterized as "History of 1986-1987 Cases and Pounds" but this characterization was amended to "Estimates of 1986-1987 Cases and Pounds" by letter of amendment dated June 18, 1987. IFB 87-1 provides elsewhere that these distribution rates are subject to change. By further letter of amendment dated June 23, 1987, the Department notified prospective bidders that bids based upon combinations of regions were acceptable, and revised bid sheets with blanks for the dollar bid for each of the three types of commodities were provided to prospective bidders with the letter of amendment. On June 26; 1987; the Department conducted a bidder's conference for IFB 87-1. Representatives from Wales and Mid-Florida attended the bidder's conference and asked questions of the Department's representatives concerning IFB 87-1. Wales, Mid-Florida, and Gulf Cargo (among others) submitted sealed bids by the deadline at 2:00 p.m., July 10, 1987. Gulf Cargo submitted a bid for Region I only. Wales submitted individual bids for each of Regions I through VI. Mid- Florida submitted individual bids for Regions II through VI and two bids combining various regions except for Region I. Gulf Cargo was awarded a contract for Region I, and Mid-Florida was awarded a contract based on its combined bid for Regions II through VI. The bid awards were announced on July 17, 1987. Wales' notice of intent to file formal written protest is dated July 23, 1987. Wales filed its formal written protest on July 31, 1987. The volume and type of surplus foods distributed through the program is solely dependent upon the commodities made available to the Department by the federal government. There is no guarantee that the State of Florida will receive any particular amount or mix of the commodities distributed through the program. Therefore, the data supplied by the Department to prospective bidders regarding the volume and type of surplus foods to be stored and distributed is based upon actual historical data and is the most accurate data available. Neither IFB 87-1 nor the contracts for previous years under this program guarantee the successful bidder any amount of revenue or any volume of goods to be handled. The method of bid evaluation that was set forth in IFB 87-1, which was emphasized at the bidder's conference, and which was memorialized in the Department's June 29, 1987 listing of questions and answers from the bidder's conference and sent to all prospective bidders was the same the Department would average the bid prices for each type of commodity, i.e., frozen, dry and chilled. The averaging method utilized results in the lowest cost accruing to Use State and actually resulted in a lower bid price for the 1987-88 contracts than the 1986-87 contracts. The actual cost to a provider of storing and transporting frozen, chilled, and dried commodities varies according to the facilities and equipment owned by each prospective bidder. The averaging method utilized by the Department for IFB 87-1 permits bidders to develop competitive bids based upon the bidder's individual costs, storage facilities and equipment; and the bidder's anticipation of the volumes and types of commodities likely to be received from the federal government. The information provided in IFB 87-1 as to drop sites for delivery by the providers was sufficient for prospective bidders to develop competitive bids. The requirement contained in IFB 87-1 that the provider would be responsible for providing off-loading facilities in Dade, Broward, and Duval counties did not prevent the formulation of competitive bids.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Lawn it is, RECOMMENDED that a Final Order be entered dismissing the bid protest filed by Wales Industries Inc.; awarding the 1987-88 contract for Region I to Gulf Cargo Services, Inc.; and awarding the 1987-88 contract for Regions II-VI to Mid-Florida Freezer Warehouses Ltd. DONE and RECOMMENDED this 14th day of October, 1987, at Tallahassee, Florida. LINDA M. RIGOT Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 14th day of October, 1987. APPENDIX TO RECOMMENDED ORDER, CASE NO. 87-3317BID The Department's proposed findings of fact numbered 1-3 and 7 have been adopted either verbatim or in substance in this Recommended Order. However, the Department's proposed findings of fact numbered 4-6 have been rejected as not constituting findings of fact but rather as constituting argument of counsel or conclusions of law. Mid-Florida's proposed findings of fact numbered 1-20 have been adopted either verbatim or in substance in this Recommended Order. Wales' proposed findings of fact numbered 1-4 and 9 have been adopted either verbatim or in substance in this Recommended Order. However, Wales' proposed findings of fact numbered 12-15 have been rejected as being contrary to the evidence in this cause; Wales' proposed finding of fact numbered 16 has been rejected as not being supported by the evidence in this cause; and Wales' proposed findings of fact numbered 5-8, 10, and 11 have been rejected as being subordinate to the issues under consideration herein. COPIES FURNISHED: Sam Powers Clerk Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, Florida 32399-0700 Martin R. Dix Esquire Barnett Bank Building Suite 800 315 South Calhoun Street Tallahassee, Florida 32301 Robert Powell, Esquire Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee Florida 32399-0700 Harold T. Bistline Esquire Building 1, Suite 10 1970 Michigan Avenue Cocoa, Florida 32922 Gregory L. Coler, Secretary Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, Florida 32399-0700

Florida Laws (2) 120.53120.57
# 1
STATE PAVING CORPORATION vs. DEPARTMENT OF TRANSPORTATION, 87-003848BID (1987)
Division of Administrative Hearings, Florida Number: 87-003848BID Latest Update: Oct. 01, 1987

Findings Of Fact On or about June 3, 1987, DOT advertised that it would receive bids on State Project No. 97870-334, etc. in Dade, Broward and Palm Beach Counties to improve portions of the Florida Turnpike. On June 24, 1987, bids were received by DOT from Gilbert, State Paving and Archer Western Contractors. The apparent low bidder at bid opening on June 24, 1987, was Gilbert and State Paving was apparent second low bidder. DOT was informally advised by John Beck, an attorney representing State Paving, that Gilbert's bid was believed to be unbalanced and the appropriate officials referred the issue to the DOT Bureau of Estimates to look into the low bid to see if it was unbalanced to the detriment of the State. Review of the Gilbert bid began with an internal analysis of the bid prices in comparison to the DOT Estimate of the Work. All bid prices above or below a certain percent of the engineer's estimate of costs were prepared in a computer printout and those items were checked by the consultants on the project. Basically, the major items in the project, which comprises some 400 bid items, were broken down to 10 groupings and the bids for each item in these groups was prepared for the three bidders and tabulated in Exhibit 2. The DOT Technical Committee reviewed the bids and concluded there was no unbalancing in Gilbert's bid which was detrimental to the State. This recommendation was approved by the Awards Committee which had also been furnished the information in Exhibit 2 by the consulting engineer for the project. Based upon this information, the Awards Committee concluded that the awards should go to Gilbert as no unbalancing detrimental to the State was found. Specification made a part of all DOT bid proposals provide that DOT may reject an unbalanced bid. As a matter of policy, DOT only rejects unbalanced bids deemed contrary to the interests of the State. Bids may be unbalanced in numerous ways. One significant method is known as front loading where the bidder submits a high bid for the work to be done at the beginning of the project such as clearing and grubbing and low bids for the work done later in the project. If successful in getting the award, this bidder would have excess profits on the clearing and grubbing which could draw interest while the less profitable later work was being done. Another variant is to study the plans and specifications to see if the quantities listed in the bid proposal are accurately reflected in the plans and specifications. If not, those items for which the bid proposal shows more than the plans and specifications reasonably required can be bid low, and for those items by which the bid proposal shows less than actually will be required can be bid high. Since the contractor is paid by the units used, those excess units at a higher price would result in more profit for the contractor yet allow him to submit an overall lower bid. For example, if the bid proposal contains two similar items for which the request for proposal estimates 100 each will be required, and the bidder concludes that only 50 will be required at Site A and 150 at Site B, he submits a low bid for Site A and a high bid for Site B. If the fair price for these units is $10 each, and the bidder bids $5 per unit for Site A or $500, and $15 for Site B or $1500, the total bid price is $2000, but if the bidder only installs 50 at Site A he would be paid $250 and install $150 at Site B for which he would be paid $2250. His total compensation would be $2500. In competitively bid contracts, such as the instant project, contractors modify their prices by taking a calculated risk that certain items bid on will not need to be accomplished and submit a nominal bid of $1 or 1 cent for such an item. By definition, such a bid is unbalanced, but if the item so bid has to be provided, the contractor has to provide this service at the bid price. The only evidence submitted by Petitioner tending to show Gilbert's bid was unbalanced to the detriment of the State was testimony, objected to and sustained, that the plans and specifications showed more of certain units would be needed than the estimated quantities on the bid proposal, which constituted the basis for the bids submitted. Such evidence constitutes a challenge to the bid specifications and is untimely. Gilbert's witness who prepared the bid submitted by Gilbert adequately explained the basis for bids submitted by Gilbert on the challenged items. The document entitled "This is Not an Addendum," clearly states on its face that "an addendum may follow containing the following information." No bids are solicited thereby and for no item contained thereon is the State obligated to contract. This document was provided all bidders before bids were open and no unfair advantage to anyone or detriment to the State was shown. In a project containing some 400 bid items, many modifications of the contract during construction is required to cover unforeseen circumstances that arise. While it would be better to get competitive bids on every bit of work done on this project, in this imperfect world unforeseen items will appear. The document complained of attempts to alert the bidders to some anticipated work not foreseen when the bid proposal was prepared, but it is not a part of the bid solicitation.

Florida Administrative Code (1) 14-25.024
# 2
DADE COUNTY INVESTMENTS COMPANY AND LUTZ CRUZ vs DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES, 91-004470BID (1991)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Jul. 19, 1991 Number: 91-004470BID Latest Update: Oct. 31, 1991

The Issue Whether Respondent should sustain Petitioners' challenge to the preliminary determination to reject their bid as not responsive to Respondent's Invitation to Bid for Lease No. 590: 2286? 1/

Findings Of Fact Based on the record evidence, the following Findings of Fact are made: Earlier this year, Respondent issued an Invitation to Bid for Lease No. 590: 2286 (hereinafter referred to as the "ITB"). The first page of the ITB contained the Bid Advertisement, which read as follows: The State of Florida, Department of Health and Rehabilitative Services is seeking an existing facility in Dade County to lease for use as office space containing approximately 30,086 net rentable square feet. The space proposed must be an office environment. Converted factories/warehouses in industrial areas are not acceptable. The facility shall be located within the following boundaries: North By S.W. 8th Street, South By S.W. 88th Street, East By S.W. 37th Avenue, Southeast By South Dixie Highway, and West By S.W. 87th Avenue. Any facility located on a parcel of land which abuts any of the street boundaries is consider[ed] within the boundaries. Occupancy date of 8/01/91. Desire a Ten (10) year lease with three (3)- two (2) year renewal options. Information and specifications may be obtained from Mr. Philip A. Davis, Facilities Services Manager, 401 N.W. 2nd Avenue, Suite S721, Miami, Florida 3312, (305) 377-5710. Please reference lease number 590: 2286. Program requirements will be discussed at a pre-proposal conference to be held at 10:00 a.m. on 4/22/91 at 401 N.W. 2nd Avenue, Suite S721 Miami, Florida 33128. Bid opening date will be on 5/30/91 at 10:00 a.m. at the above mentioned address. Minority business enterprises are encouraged to attend the pre-proposal conference and participate in the bid process. The Florida Department of Health and Rehabilitative Services reserves the right to reject any and all bids and award to the bid judged to be in the best interest of the state. The second page of the ITB contained the definitions of various terms used in the ITB. Among the terms defined were "dry and measurable" and "existing building." "Dry and measurable" was defined as follows: These are essential characteristics to describe "existing" proposed space. To be considered as "dry and measurable" the proposed space must be enclosed with finished roof and exterior walls in place. Interior floors need not be completed. Exterior windows and doors need not be installed. The proposed area is not required to be completed. These characteristics conform to standard lessor construction practices. This definition is identical to the definition of this term found on page 1-5 of Respondent's leasing manual, HRSM 70-1. "Existing building" was defined as follows: To be considered as existing the entire space being bid must be dry and capable of being physically measured to determine net rentable square footage. at the time of bid submittal. On the ninth page of the ITB, the following advisements, among others, were given: The department reserves the right to reject any and all bids when such rejection is in the interest of the State of Florida. Such rejec- tion shall not be arbitrary, but be based on strong justification which shall be communi- cated to each rejected bidder by certified mail. * * * The department reserves the right to waive any minor informalities or technicality and seek clarification of bids received when such is in the best interest of the state, but not limited to the correction of simple mistakes or typo- graphical errors. Such corrections will be initiated [sic] and dated on the original bid submittal by the bidder. Attached to the ITB and incorporated therein was a document entitled "Standard Method of Space Measurement." It read as follows: The purpose of this standard is to permit communication and computation on a clear and understandable basis. Another important purpose is to allow comparison of values on the basis of a generally agreed upon unit of measurement (net square footage). It should also be noted that this standard can and should be used in measuring office space in old as well as new buildings, leased office space as well as State-owned office space. It is applicable to any architectural design or type of construction because it is based on the premise that the area being measured is that which the agency may occupy and use for its furnishings and its people. This standard method of measuring office space measures only occupiable space, undistorted by variances in design from one building to another. It measures the area of office building that actually has usable (rental) value and, therefore, as a standard can be used by all parties with confidence and a clear understanding of what is being measured. Area Measurement in office buildings is based in all cases upon the typical floor plans, and barring structural changes which affect materially the typical floor, such measurements stand for the life of the building, regardless of readjustments incident to agency layouts. All usable (rentable) office space, private sector leased, State-owned, or other publicly owned shall be computed by: Measuring to the inside finish of permanent outer building walls to the office side of corridors and/or other permanent partitions, and to the center of partitions that separate the premises from adjoining usable areas. This usable (rentable) area shall EXCLUDE: bathrooms, public corridors, stairs, elevator shafts, flues, pipe shafts, vertical ducts, air-conditioning rooms, fan rooms, janitor closets, electrical closets, telephone equipment rooms, - - and such other rooms not actually available to the tenant for his furnishings and personnel - - and their enclosing walls. No deductions shall be made for columns and projections structurally necessary to the building. The attached typical floor plan illustrates the application of this standard. 3/ Petitioners submitted a bid in response to the ITB. 4/ In their bid they proposed to lease to Respondent space on the first and second floors of a building located at 8500 S.W. 8th Street in Miami, Florida. The space offered by Petitioners is currently occupied. At the time of bid submittal, all of the proposed space on the second floor was "dry and measurable," as that term is defined in the ITB. It encompassed a total of 26,540 square feet. At the time of bid submittal, only a portion of the proposed space on the first floor, amounting to 4,400 square feet, was "dry and measurable," as that term is defined in the ITB, inasmuch as the proposed space on this floor included a breezeway area that did not have either a front or back exterior wall in place. 5/ Subsequent to the submission and opening of bids, Petitioners enclosed this breezeway area by erecting exterior walls. Accordingly, the entire space offered by Petitioners was not "dry and measurable" at the time of bid submittal as required by the ITB. Bids were opened by Respondent on May 30, 1991. By letter dated June 18, 1991, Respondent notified Petitioners that their bid had been deemed non-responsive. The letter read as follows: The bid you submitted for lease No. 590: 2286 has been determined to be non-responsive because the proposed space is not dry and measurable. The breezeway area proposed on the ground level of your premises at 8500 S.W. 8 Street, Miami, does not have exterior walls in place. The invitation to bid on lease No. 590: 2286 provides on page 2: "Dry and Measurable- These are essential characteristics to describe "existing" proposed space. To be considered as "dry and measur- able," the proposed space must be enclosed with finished roof and exterior walls in place. You have the right to file a protest. The protest must be filed in accordance with S.120.53(5), Florida Statutes and Chapter 10-13.11 Florida Administrative Code. Failure to file a protest within the time prescribed in S.120.53(5), Florida Statutes, shall constitute a waiver of proceedings under chapter 120, Florida Statutes. To comply with the referenced statute, a written notice of intent to protest must be filed with the contact person listed on the Invitation to Bid for lease No. 590: 2286 within 72 hours after receipt of this notice. Within ten calendar days after the notice of protest is filed, a formal written protest and protest bond must be filed with the contact person. The bond must be payable to the department in an amount equal to one percent of the total lease payments over the term of the lease or $5,000, whichever is less. This determination was the product of, not any unlawful bias or prejudice against Petitioners, but rather the honest exercise of the agency's discretion. Petitioners subsequently filed a protest of this preliminary determination to find their bid non-responsive. It is this preliminary determination that is the subject of the instant bid protest proceeding.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is hereby recommended that the Department of Health and Rehabilitative Services enter a final order rejecting Petitioners' bid for Lease No. 590: 2286 on the ground that said bid is non-responsive. RECOMMENDED in Tallahassee, Leon County, Florida, this 25th day of September, 1991. STUART M. LERNER Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 25th day of September, 1991.

Florida Laws (2) 255.249255.25
# 3
PLASCO, INC. vs BROWARD COUNTY SCHOOL BOARD, 01-003203BID (2001)
Division of Administrative Hearings, Florida Filed:Fort Lauderdale, Florida Aug. 14, 2001 Number: 01-003203BID Latest Update: Oct. 18, 2019

The Issue The issue for determination is whether the School Board of Broward County, Florida (“SBBC”) improperly awarded a contract pursuant to Invitation to Bid No. 21-244H for “Photo ID Card and Printing System Supplies” (“ITB”) to Intervenor, Identicard Systems, Inc. (“Identicard"). Petitioner Plasco, Inc. ("Plasco") contends that the recommended award to Identicard is clearly erroneous, contrary to competition, arbitrary, capricious, or contrary to the specifications of the ITB. The resolution of the ultimate issue turns on whether the uninitialed corrected figures contained within Plasco’s bid response for both the unit price and the total cost of Item 1(N) were a material deviation from the bid specifications requiring rejection of the bid.

Findings Of Fact SBBC desired to procure photo identification card and printing systems supplies to prepare identification cards for school district employees, students in selected schools, and outside vendors. SBBC has adopted School Board Policy 3320 which governs its purchasing of goods and services. On or about April 30, 2001, SBBC released the ITB. General Condition 1(c) of the ITB stated in pertinent part: EXECUTION OF BID: . . . If a correction is necessary, draw a single line through the entered figure and enter the corrected figure or use an opaque correction fluid. All corrections must be initialed by the person signing the bid even when using opaque correction fluid. Any illegible entries, pencil bids or corrections not initialed will not be tabulated. . . . General Condition 2 of the ITB stated in pertinent part: PRICES QUOTED: . . . Give both unit price and extended total. Prices must be stated in units to quantity specified in the bidding specification. In case of discrepancy in computing the amount of the bid, the Unit Price quoted will govern. . . . General Condition 7 of the ITB stated in pertinent part: AWARDS: In the best interest of the School Board, the Board reserves the right to withdraw this bid at any time prior to the time and date specified for the bid opening; to reject any and all bids and to waive any irregularity in bids received; to accept any item or group of items unless qualified by bidder. . . . All awards made as a result of this bid shall conform to applicable Florida Statutes. Special Condition 3 of the ITB states as follows: AWARD: Bid shall be awarded by GROUP to the lowest responsive and responsible bidder meeting specifications, terms and conditions. Therefore, it is necessary to bid on every item in the group, in order to have the bid considered for award. Unit prices must be stated in the space provided on the Bid Summary Sheet. SBBC may need to order an individual component within a group. All items within a group must have an individual cost. Failure to state the individual cost for an item within a group will result in disqualification of the group. Bidder should carefully consider each item for conformance to specifications. In the event that one item in the group does not meet the specifications, the entire group will be disqualified. On June 7, 2001, Plasco, Identicard, and seven other companies submitted responses to the ITB. After receiving the bid responses, SBBC’s Purchasing Department examined and computed the figures submitted by each bidder for each item listed in the Bid Summary Sheets. For each item, a quantity figure had been supplied by SBBC in the bid specifications. The bid was structured so that the specified quantity would be multiplied by a unit price furnished by the bidder on its Bid Summary Sheets. The bidder was also required to furnish a total cost for each individual item in its Bid Summary Sheets. The bids submitted by both Identicard and Plasco contained a number of uninitialed corrections. Although such uninitialed corrections violated General Condition 1(c), the SBBC properly deemed such errors to be immaterial in every instance where only one figure per specified Item was tainted by a violation of this General Condition. For example, where a particular component of the bid required the bidder to specify a unit cost and a total cost for the quantity of goods specified in that particular component, the SBBC was willing to perform the mathematical calculation necessary to confirm the correctness of the uninitialed figure. As applied to this particular type of uninitialed correction, SBBC staff would multiply or divide the quantity specified in the ITB by the "untainted" number provided by the bidder to confirm the correctness of the uninitialed corrected figure submitted in violation of General Condition 1(c). The Bid Summary Sheet submitted by Plasco for Item 1(N) contained a different violation of General Condition 1(c), to wit, it contained two uninitialed corrected figures. The corrections were accomplished through the use of correction fluid. Plasco's Bid Summary Sheet with respect to Item 1(N) stated in pertinent part as follows: UNIT TOTAL PRICE COST * * * FARGO ACCESSORIES N. 3 each 81524 Thermal Printhead $389.35 ea $1,168.05 for Cheetah/Cheetah II/ Pro/Pro-L/Presto! Quatro/ Presto! System The Unit Price of $389.35 as well as the Total Cost of $1,168.05 for Item 1(N) set forth in Plasco’s bid was a corrected price and was not initialed by the person signing the bid on behalf of Plasco. Notwithstanding this "double correction," it was possible within the four corners of Plasco's bid to verify the unit price of the Item and thus to confirm, mathematically, a total price. The Item in question, a printhead, was the subject of four additional bid items. In each instance, Plasco bid $389.35 per printhead, a number which matched Plasco's corrected figure in Item 1(N). SBBC was not misled by Plasco's failure to initial either or both corrections in Item 1(N). Correctly using Plasco's uninitialed corrections as set forth in Item 1(N), SBBC accurately performed the calculations necessary to verify Plasco's bid; therefore the Bid Summary prepared by SBBC staff accurately reflected that Plasco was the low bidder at $93,449.68. The responses to the ITB were reviewed by school district staff on or about June 7, 2001. The so-called "double correction" in Item 1(N) was SBBC's sole basis for its decision to reject Plasco's low bid, and to recommend that Identicard's next lowest bid of $100,720.12 be accepted. At no time relevant to this case did SBBC have a written policy which compels that any bid containing two uninitialed corrections be excluded from consideration. The evidence establishes that SBBC was able to and in fact did accurately account for the individual numbers contained in Item 1(N), as well as any and all other numbers affected by the numbers supplied by Plasco in response to Item 1(N). Under the facts of this case, Plasco's error in failing to initial the corrections in Item 1(N) was immaterial. SBBC maintains that it must enforce its unwritten policy of excluding bids containing two uninitialed corrections within a single item in order to protect the integrity of the bid process. There is no evidence that the integrity of the bid process in this case was compromised in any way. No good faith argument was made that there was any type of collusion or improper conduct in connection with this bid. Instead, the evidence establishes that Plasco's bid was responsive and responsible in all material respects, inasmuch as SBBC staff was able to accurately ascertain, to the penny, the amount of Plasco's low bid. Plasco timely filed its Notice of Protest with SBBC on June 18, 2001. Plasco timely filed a Formal Written Protest with SBBC on June 27, 2001. Pursuant to Section 120.57(3)(c), Florida Statutes, and School Board Policy 3320, SBBC provided an opportunity for Plasco to meet with the agency’s Bid Protest Committee in an attempt to resolve the protest by mutual agreement. The Bid Protest Committee conducted a duly-noticed public meeting with Petitioner Plasco on July 9, 2001. Upon consideration, the Bid Protest Committee rejected the protest of Plasco and upheld the recommendation to award the bid to Identicard.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the School Board of Broward County, Florida, enter a Final Order awarding the ITB to Plasco, and, upon submission of documentation contemplated in the parties' stipulation regarding costs, assess costs of this action in Plasco's favor in its Final Order pursuant to School Board Policy 3320, VI (n). DONE AND ENTERED this 9th day of October, 2001, in Tallahassee, Leon County, Florida. ___________________________________ FLORENCE SNYDER RIVAS Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 9th day of October, 2001. COPIES FURNISHED: Mitchell W. Berger, Esquire David L. Ferguson, Esquire Berger Singerman 350 East Las Olas Boulevard Suite 1000 Fort Lauderdale, Florida 33301 Robert Paul Vignola, Esquire Steven H. Feldman, Esquire Broward County School Board K.C. Wright Administration Building 600 Southeast Third Avenue, 11th Floor Fort Lauderdale, Florida 33301 Mark A. Emanuele, Esquire Panza, Maurer, Maynard & Neel, P.A. Bank of America Building, Third Floor 3600 North Federal Highway Fort Lauderdale, Florida 33308 Dr. Franklin Till, Jr., Superintendent Broward County School Board K.C. Wright Administration Building 600 Southeast Third Avenue Fort Lauderdale, Florida 33301 James A. Robinson, General Counsel Department of Education The Capitol, Suite 1701 Tallahassee, Florida 32399-0400

Florida Laws (2) 120.57120.68
# 4
PAC-TEC, INC. vs DEPARTMENT OF MANAGEMENT SERVICES, 95-006011BID (1995)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Dec. 13, 1995 Number: 95-006011BID Latest Update: Feb. 16, 1996

The Issue Whether Petitioner's bid protest should be dismissed for failure to state with specificity the underlying facts of the protest or facts sufficient to form a basis for a bid protest.

Findings Of Fact The Petitioner filed a bid protest of Invitation To Bid (ITB) No. 13- 550-002-A for raised pavement markers. Petitioner was disqualified from award of the bid due to the failure to meet the requirement that the products bid must be on the Florida Department of Transportation Qualified Products List at the time of the bid opening. Petitioner's Formal Protest contains no specific allegations of fact and as such is not in conformance with Rule 60Q-2.004(3), Florida Administrative Code, and Section 120.53(5)(b), Florida Statutes. On December 20, 1995, the Hearing Officer, sua sponte, entered an order requiring Petitioner to file an amended Formal Protest stating with specificity the facts and law which form the basis for its protest. The document filed by Petitioner in response to the order in essence: States there are on-going discussions with the Florida Department of Transportation, ("FDOT") District V Secretary and the Florida Department of Transportation Secretary that should preempt any further litigation. Complains that Section 316.0745(4), of the Florida Statutes is being improperly interpreted by FDOT so that the State is being forced to purchase a highway safety product at a cost far in excess of prudent purchasing practices. Alleges that the Petitioner meets all the qualifications of laboratory and field testing required by the Florida Department of Transportation Materials Laboratory . . . The formal protest filed in this case by Pac-Tec does not provide such notice to the Department of Management Services. Therefore the Department of Management Services cannot prepare an adequate defense to the protest. The response does not cure the deficiencies in the formal protest.

Recommendation Based upon the findings of fact and the conclusions of law, it is, RECOMMENDED: That the Department of Management Services issue a Final Order dismissing the Formal Protest filed by Petitioner. DONE and ENTERED this 24th day of January, 1996, in Tallahassee, Leon County, Florida. DIANE CLEAVINGER, Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 24th day of January, 1996. COPIES FURNISHED: Cindy Horne, Esquire Department of Management Services 4050 Esplanade Way, Suite 260 Tallahassee, Florida 32399-0950 David H. Smith, Esquire Post Office Box 279 Astor, Florida 32101 Mary M. Piccard, Esquire Cummings, Lawrence & Vezina, P.A. Post Office Box 589 Tallahassee, Florida 32302-0589 William H. Linder, Secretary Department of Management Services 4050 Esplanade Way Tallahassee, Florida 32399-0950 Paul A. Rowell, Esquire Department of Management Services 4050 Esplanade Way Tallahassee, Florida 32399-0950

Florida Laws (3) 120.53120.57316.0745 Florida Administrative Code (1) 60A-1.006
# 5
J C AND C ASSOCIATES, INC. vs DEPARTMENT OF LOTTERY, 94-003955BID (1994)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Jul. 18, 1994 Number: 94-003955BID Latest Update: Mar. 13, 1996

The Issue Whether Respondent has acted acted fraudulently, arbitrarily, capriciously, illegally, or dishonestly with regard to the intended award of ITB 93/94-040- LOT/P.

Findings Of Fact By correspondence filed July 18, 1994, this bid protest was referred to the Division of Administrative Hearings from the Department of Lottery for the conduct of formal proceedings pursuant to Section 120.53(5), Florida Statutes. The formal bid protest document consists solely of a single page letter signed by Petitioner's president, C. Whitside-Curry, basically stating that the letter is to serve as Petitioner's formal written protest to Respondent's "Notice of Award - Notice of Non-Responsiveness - ITB 93/94-040-LOT/P - Invitation To Bid for Painting the Interior of the Lottery Central Building. Final hearing in the matter was scheduled for August 2, 1994, in compliance with requirements of Section 120.53(5)(e), Florida Statutes, that bid protests be set for hearing within 15 days absent stipulation of the parties waiving that statutory time frame. By motion filed July 29, 1994, counsel for Petitioner sought a continuance of the final hearing for a period of one week. Counsel had just been retained by Petitioner. As reflected in Petitioner's motion, counsel's request for a one week delay was acceptable to counsel for Respondent, provided that: the 30 day time frame governing issuance of recommended orders in bid challenge cases was not waived. that deposition of a principal of Petitioner, C. Whitside-Curry, be held on August 3, 1994 at 11:30 a.m. and that certain documents also be produced. A telephone hearing on Petitioner's continuance motion was held on August 1, 1994, to clarify the hearing officer's understanding that a one week continuance of the final hearing would not subtract a period of one week from the 30 day time frame following the final hearing within which to prepare a recommended order in the case. Thereafter the motion was granted and final hearing rescheduled, as agreed in the telephone conference, for August 9, 1994, one week after the initial hearing date. By notice filed on August 3, 1994 (transmitted to Petitioner's counsel by facsimile transmission on July 29, 1994), Respondent documented the agreed upon deposition of C. Whitside-Curry and documents to be produced. By motion filed on August 3, 1994, subsequent to Respondent's notice, Petitioner's counsel sought a further continuance of the final hearing and noticed the unavailability of Petitioner's principal, C. Whitside-Curry, for the scheduled deposition on August 3 or the final hearing scheduled for August 9, 1994. By motion filed on August 3, 1994, subsequent to Petitioner's second motion for continuance, Respondent moved for imposition of sanctions, including the dismissal of the bid protest on the basis that Petitioner had not complied with conditions agreed to by the parties as a part of the one week continuance, i.e., C. Whitside-Curry did not appear for deposition and documents were not produced. The motion further related that Respondent's notice of the deposition and request to produce documents (filed on August 3, 1994) had been transmitted, as noted above, to Petitioner's counsel by facsimile transmission on July 29, 1994. In the course of telephone conference with the parties on August 8, 1994, Petitioner's counsel agreed to payment of costs related to court reporter expense incurred by Respondent at the deposition where Petitioner's principal failed to appear. Respondent's counsel refused to consent to further continuance of the final hearing and Petitioner's request for a second continuance was denied. At final hearing, consideration was given to an Petitioner's Amended Second Motion For Continuance. The motion differed from previous motions to the extent that an attached copy of a letter dated April 21, 1994, appeared to indicate that a mediation meeting in another legal proceeding required the Petitioners' presence in Tampa, Florida, on the afternoon of August 9, 1994. No direct admissible evidence of Petitioner's inability to attend the hearing was presented. Upon denial of the amended motion for continuance, counsel for Petitioner announced that he could not go forward.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that the formal bid protest filed in response to Respondent's intent to award ITB 93/94-040-LOT/P, be DISMISSED. DONE AND ENTERED this 10th day of August, 1994, in Tallahassee, Leon County, Florida. DON W. DAVIS Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 10th day of August, 1994. COPIES FURNISHED: Curley R. Doltie, Esquire 1103 Hays Street P.O. Box 1325 Tallahassee, Florida 32302 Louisa Warren, Esquire Department of Lottery 250 Marriot Drive Capitol Complex Tallahassee, Florida 32399-4011 Marcia Mann Secretary Department of Lottery Capitol Complex Tallahassee, Florida 32399-4002 Ken Hart General Counsel Department of Lottery Capitol Complex Tallahassee, Florida 32399-4011 NOTICE OF RIGHT TO SUBMIT EXCEPTIONS All parties have the right to submit written exceptions to this recommended order. All agencies allow each party at least 10 days in which to submit written exceptions. Some agencies allow a larger period within which to submit written exceptions. You should consult with the agency that will issue the final order in this case concerning their rules on the deadline for filing exceptions to this recommended order. Any exceptions to this recommended order should be filed with the agency that will issue the final order in this case. ================================================================= DISTRICT COURT OPINION ================================================================= IN THE DISTRICT COURT OF APPEAL FIRST DISTRICT, STATE OF FLORIDA J C & C ASSOCIATES, INC., NOT FINAL UNTIL TIME EXPIRES TO FILE MOTION FOR REHEARING AND Petitioner, DISPOSITION THEREOF IF FILED vs. CASE NO. 94-3185 DOAH CASE NO. 94-3955BID DEPARTMENT OF LOTTERY, Respondent. / Opinion filed January 22, 1996. An Appeal from Order of the Department of Lottery. Curley R. Doltie, Tallahassee, for Appellant. Louisa H. Warren of Department of the Lottery, Tallahassee, for Appellee. PER CURIAM. AFFIRMED. ALLEN and KAHN, JJ., and SMITH, SENIOR JUDGE, CONCUR. MANDATE From DISTRICT COURT OF APPEAL OF FLORIDA FIRST DISTRICT To the Honorable Don W. Davis, Hearing Officer Division of Administrative Hearings WHEREAS, in that certain cause filed in this Court styled: J C & C ASSOCIATES, INC., Petitioner, vs. CASE NO. 94-3185 DOAH CASE NO. 94-3955BID DEPARTMENT OF LOTTERY, Respondent. The attached opinion was rendered on January 22, 1996. YOU ARE HEREBY COMMANDED that further proceedings be had in accordance with said opinion, the rules of this Court and the laws of the State of Florida. WITNESS the Honorable E. Earle Zehmer Chief Judge of the District Court of Appeal of Florida, First District and the Seal of said court at Tallahassee, the Capitol, on this 11th day of March, 1996. (SEAL) Jon S. Wheeler Clerk, District Court of Appeal of Florida, First District

Florida Laws (2) 120.53120.57
# 6
UNIVERSAL NETWORK, INC. vs ALACHUA COUNTY SCHOOL BOARD, 91-005356BID (1991)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Aug. 27, 1991 Number: 91-005356BID Latest Update: Nov. 26, 1991

The Issue This cause has been resolved upon Intervenor's Motion to Dismiss for Petitioner's failure to timely file the formal written protest required by Section 120.53(5) F.S. [1990 Supp.] to protest award of Respondent Alachua County School Board's BID 341 "Bid Proposal For Furnishing Monitoring Security Systems" to Intervenor.

Findings Of Fact Request for Bid 341 "Bid Proposal For Furnishing Monitoring Security Systems" dated June 14, 1991 was issued by Respondent Alachua County School Board and received by Petitioner/protestant Universal Network, Inc. on or about that date. The bid-closing date was 1:30 p.m. July 2, 1991. No one challenged or protested the specifications prior to the bid submittal date. Universal Network, Inc. and Crime Prevention Security Systems were the only bidders who timely filed bids on or before June 2, 1991. The request for bid accompanied by bid specifications had notified all potential bidders that School Board personnel also intended to open the bids on July 2, 1991, and stated that "Bid tabulations with recommended awards will be posted . . . on or about the Monday following bid opening, . . ." The request for bid also provided "Failure to file a protest within the time prescribed in Section 120.53(5) Florida Statutes, shall constitute a waiver of proceedings under Chapter 120, Florida Statutes." (HO Exhibit 6) The bids were opened July 2, 1991, and oral communications were made by Respondent's personnel to the effect that Crime Prevention Security Systems would probably be successful since it was low bidder. However, Respondent's personnel delayed posting a formal intent to award on Monday, July 8, 1991 because Petitioner orally announced itself aggrieved by the process. Eight days after the bid opening, on July 10, 1991, Respondent's personnel met with both bidders in an effort to resolve any issue that could result in a formal protest. This meeting was tape recorded by the Petitioner. After this meeting, Petitioner filed a letter dated July 11, 1991 stating that Petitioner "learned" through "verbal notification" as of the July 10 meeting that it would not be awarded the bid, outlining its own prior contract work for the Respondent School Board, attacking the bid specifications, and notifying the Respondent that Petitioner would cease to monitor security under the existing contract at midnight on July 31, 1991. At hearing, Petitioner acknowledged that it did not rely on this July 11, 1991 letter (HO Exhibit 1) as its notice of protest. Nothing was formally decided until, on July 16, 1991, Respondent, through its employee, David C. Hotary, formally posted its intent to award Bid 341 to Crime Prevention Security Systems. On that date, Respondent also wrote and hand-delivered a formal letter-notice of intent to Petitioner's president. That letter provided, in pertinent part: As follow-up to our meeting of July 10, and your letter of July 11, this is to advise that posting of the recommended bid award to crime prevention security systems occurred as of this date and will remain posted for a three day period. Failure to file a protest within the time prescribed in s. 120.53(5), Florida Statutes, shall constitute a waiver of proceedings under chapter 120, Florida Statutes. (Emphasis supplied) (HO Exhibit 2) There is no dispute that Petitioner actually received this written notice of decision or intended decision on July 16, 1991. This procedure complied with Respondent's obligations to provide notice of the award and a window for Petitioner's bid protest under the provisions of Section 120.53(5)(a). F.S. [1990 Supp.] and Respondent's rule (HO Exhibit 5). On July 17, 1991, the Petitioner's president filed with the Respondent a letter bearing that date which provided, in pertinent part, This letter is to inform you that Universal Network, Inc. is now formally protesting BID 341 "Bid Proposal For Furnishing Monitoring Security Systems." We base our protest on unpublished bid variances. (HO Exhibit 3) There is no dispute that this letter was filed with the Respondent within 72 hours "after the posting of the bid tabulation or after receipt of the notice of agency decision or intended decision." It clearly constituted the "notice of protest" contemplated by Section 120.53(5)(b) F.S. [1990 Supp.] and is timely under that statute. Under that statute and pursuant to Respondent's rule, the 10 days for filing the required formal written protest would have run out on July 29, 1991, a Monday, allowing for Saturday and Sunday. On July 24, 1991, five days before the formal written protest was due, Respondent's personnel telephoned the Petitioner's president and a conversation ensued. Upon the representations at formal hearing of Petitioner's president Daniel Boudreau, it is found that this conversation encouraged him to file another letter to the Respondent on July 31, 1991. (HO Exhibit 4) Petitioner's president asserted that Respondent's July 24, 1991 phone call was only to urge him to file a letter setting out his grounds for protest more fully so that the issues between Petitioner and Respondent could be resolved informally. Filing a letter which sets out the grounds for a notice of protest is a fair description of what a formal written protest is supposed to do, and it was Respondent's position that the phone call was to urge Petitioner to file its formal written protest. Whether or not the filing of this July 31, 1991 letter could constitute a means of informal resolution of the bid dispute as asserted by Petitioner is a legal issue and is discussed in the Conclusions of Law, infra, but it is undisputed that Respondent's telephone call of July 24, 1991 actually encouraged Mr. Boudreau to file a more detailed letter and did nothing to discourage filing a formal written protest, which formal written protest is mandatory under the applicable statute and rule. Nonetheless, Petitioner filed nothing whatsoever in writing with the Respondent between July 17, 1991 (the date of the notice of protest) and July 31, 1991. On July 31, 1991, Petitioner filed with the Respondent its letter which provided, in pertinent part: This letter is to inform you that Universal Network, Inc. has formally protested BID 341 "Bid Proposal for Furnishing Monitoring Security Systems." We base our protest on unpublished bid variances. Universal Network, Inc. is now asking for a formal hearing and also will be willing to submit a new bid with the SBAC corrected bid specification. Petitioner's July 31, 1991 letter goes on to compare how Petitioner's bid would be altered as of July 31, 1991 if the original bid specifications had specified or clarified certain items or terms and to show that Petitioner's July 2, 1991 bid price would have been lower if that had been the case. (HO Exhibit 4) Petitioner's July 31, 1991 letter clearly constituted Petitioner's "formal written protest" as contemplated by Section 120.53(5)(b) F.S. [1990 Supp.] and the rule and is untimely under that statute and rule.

Recommendation Upon the foregoing Findings of Fact and Conclusions of Law, it is recommended that the School Board of Alachua County enter a Final Order dismissing the protest/petition of Universal Network, Inc. RECOMMENDED this 19th day of September, 1991, at Tallahassee, Florida. ELLA JANE P. DAVIS, Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 19th day of September, 1991. COPIES FURNISHED: Dale A. Boudreau, President Universal Network, Inc. 1031 NW 6 Street, Suite A-3 Gainesville, FL 32601 Thomas L. Wittmer, Staff Attorney School Board of Alachua County 620 E. University Avenue Gainesville, FL 32601 Robert E. Roundtree, Jr., Esquire 111 SE 1st Avenue Gainesville, FL 32602 Dr. Douglas Magann, Superintendent Alachua County School Board 620 East University Avenue Gainesville, FL 32601

Florida Laws (2) 120.53120.57
# 7
NEEL MECHANICAL CONTRACTORS, INC. vs FLORIDA A & M UNIVERSITY AND BOARD OF REGENTS, 99-003424BID (1999)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Aug. 11, 1999 Number: 99-003424BID Latest Update: Jan. 26, 2000

The Issue Whether the Florida A&M University's intended action to reject all bids and re-advertise the project to construct "Utilities Improvement-Central Chilled Water Plant, Phase V", known as BR-389, is illegal, arbitrary, dishonest, or fraudulent.

Findings Of Fact Based on the oral and documentary evidence presented at the final hearing and on the entire record of this proceeding, the following findings of fact are made: Parties Neel Mechanical Contracting, Inc., is a Georgia corporation authorized to do business in Florida and licensed by the Florida Construction Industry Licensing Board. Its business is air conditioning, and it specializes in larger projects such as the one at issue herein. Robert C. Sullivan is the President of Neel Mechanical. Thomas Gregory Lang is a project manager employed by Neel Mechanical and the chief estimator for Neel Mechanical; Mr. Lang is the person primarily responsible for preparing Neel Mechanical's bid proposal for Project BR-389. The Florida Board of Regents is a corporate body consisting of the Commissioner of Education and thirteen citizens appointed by the Governor and approved by three members of the Cabinet; it is subject to the general supervision and control of the Department of Education. Sections 240.203(2), 240.205, and 240.207(1), Florida Statutes (1999). The Board of Regents is a member of the State University System, is charged generally with overseeing the state universities, and has the authority to approve and execute contracts for "construction for use by a university when the contractual obligation exceeds $1 million." Sections 240.209 and 240.205(6), Florida Statutes (1999). 4/ Florida Agricultural and Mechanical University ("FAMU") is a public university located in Tallahassee, Florida, and is one of ten universities in Florida's State University System. Section 240.2011, Florida Statutes (1999). The university president is the chief administrative officer of the university and is responsible for its operation and administration. Section 240.227, Florida Statutes (1999). At the times material to this proceeding, Frederick S. Humphries was president of FAMU, and Samuel J. Houston was the Director of FAMU's Office of Facilities Planning and Construction. Mr. Houston has primary responsibility for supervising the bid process and the staff that prepared the bid documents and evaluated the bids for Project BR-389. Mr. Houston acts in this capacity on behalf of President Humphries and the Board of Regents. Mr. Houston also is ultimately responsible for the administration of Project BR-389. Bayou Mechanical, Inc. ("Bayou Mechanical") is a mechanical contractor which submitted a bid on Project BR-389. Call for Bids In Volume 25, Number 13, of the Florida Administrative Weekly, dated April 2, 1999, FAMU, on behalf of the Board of Regents, issued a Call for Bids on Project BR-389, which involves construction of a chilled water plant on the FAMU campus. The Call for Bids provided that all bidders must have a valid Florida license to do the work at the time of bid opening and a minimum of five years experience with similar projects. Project BR-389 involves a construction contract and is the fifth phase of the construction of an underground chilled water system on the FAMU campus. The project consists of constructing a portion of the system and connecting it to the existing system. The Call for Bids notified prospective bidders that sealed bids would be received at FAMU on May 4, 1999, until 2:00 p.m., after which time the bids would be opened and the bid tabulations posted. The Call for Bids further provided: "Bids must be submitted in full and in accordance with the requirements of the drawings and Project Manual." The Call for Bids advised that these documents were available at the offices of the Architect/Engineer for the project, Bosek, Gibson & Associates, Inc. ("Bosek, Gibson"), in Tallahassee, Florida. In Addendum #2 to the Project Manual, dated April 30, 1999, the date for submission of bids was changed from May 4, 1999, to May 11, 1999. The Project Manual contains Instructions to Bidders, consisting of pages 6 of 106 through 22 of 106 and dated October 16, 1989; General Conditions of the Contract for Construction, consisting of pages 23 of 106 through 106 of 106 and dated October 16, 1989; Special Conditions of the Contract, consisting of pages I-1 through I-10 and dated October 16, 1989; Supplement J to the Project Manual, consisting of pages 1 through 11 and dated February 13, 1996; Supplement K to the Project Manual, consisting of pages 1 through 5 and identified as the February 1999 Revision; Exhibit L, Supplementary Conditions to the General Conditions of the Contract for Construction, consisting of pages 2 through 16; and the Technical Specifications, which are separately identified and numbered. As noted in the Call for Bids, drawings are also included in the bid documents. Neel Mechanical, Bayou Mechanical, and Council Contracting submitted bids for Project BR-389 on May 11, 1999, the date on which the bids were opened and the price proposals were read. According to the Bid/Proposal Tabulation form that was posted from May 14 through 19, 1999, Neel Mechanical was the apparent low bidder on the base bid and on the two alternates 5/; Neel Mechanical's base bid and its bid on alternates were within FAMU's budget for the project. Bayou Mechanical submitted the second lowest bid on the base bid and the alternates; Bayou Mechanical was within the budget on the base bid but over budget on the alternates. No recommended award or intent to award was indicated on the Bid/Proposal Tabulation form. Shortly after the bids were opened, several issues were raised with respect to the bid process. First, the FAMU staff discovered that Neel Mechanical had failed to affix its corporate seal to the signature page of the bid Proposal Form and to the Bid Bond that was part of the bid submission. Second, York International Company ("York") sent via facsimile on May 11, 1999, a letter advising FAMU's Office of Facilities Planning and Construction that York intended to protest the bid. This letter raised the third issue: Of the two manufacturers identified in the project specifications, York and The Trane Company ("Trane"), only Trane manufactured a chiller that could meet the project specifications. Fourth, Mark A. Daughtery, a project manager for Bayou Mechanical, sent a letter dated May 14, 1999, to Craig Allen at Bosek, Gibson advising him that Bayou Mechanical intended to file a formal protest on Project BR-389 and identifying two issues of concern to Bayou Mechanical: Neel Mechanical's failure to affix its corporate seal to its bid submission and "the Chiller being sole sourced to Trane Company." Each of these issues is discussed in detail below. Corporate Seal The Instructions to Bidders contained in the Project Manual provide: B-16 Preparation and Submission of Bids Each Proposal shall be submitted on the form contained in the Project Manual and bid prices shall be indicated thereon in proper spaces, for the entire Work and for all Alternates. (See B-8) In the event of a discrepancy in the bid amount on the Proposal between the numeric and written quotes, the written amount will govern. Each Proposal must give the full business address of the Bidder and state whether it is an individual, corporation or partnership. Proposals by a corporation must be signed with the legal name and seal of the corporation followed by the name of the state of its incorporation and the manual signature and designation of an officer, agent or other person authorized to bind the corporation. (Emphasis added.) When it was submitted on May 11, 1999, Neel Mechanical's bid did not include the impression of its corporate seal on the bid Proposal Form signature page or on the Bid Bond submitted as part of the proposal. After the bid opening, an employee of Neel Mechanical received a telephone call from Henry Swift, FAMU's Project Manager for Project BR-389, in which he advised Neel Mechanical that its bid had not been sealed. This conversation was followed by a request from Mr. Swift, sent via facsimile transmittal to Neel Mechanical on May 13, 1999, requesting a "Letter of Clarification which confirms your status as a corporation licensed to do business in the State of Florida, registered with the Secretary of State, etc. Finally, please be sure to sign and seal your letter with your corporate seal." A letter to Mr. Swift, dated May 14, 1999, was signed and sealed by Robert C. Sullivan, President of Neel Mechanical. The letter was received in FAMU's Office of Facilities Planning and Construction on May 19, 1999. Shortly after Mr. Sullivan sent the May 14, 1999, letter, Neel Mechanical received another telephone call from Mr. Swift in which he advised Neel Mechanical that the seal needed to be physically affixed to the bid Proposal Form. Peter Lang, a project manager employed by Neel Mechanical, had business in Tallahassee, so Mr. Sullivan asked that he take the seal to Mr. Swift's office and affix it to the bid Proposal Form. When Peter Lang arrived at Mr. Swift's office, someone brought out the file and gave him the bid Proposal Form, and he affixed Neel Mechanical's corporate seal to the signature page of the form. Neel Mechanical's corporate seal was not affixed to the Bid Bond, although the seal of the surety company was on the Bid Bond when the bid was submitted. The Bid Bond was part of Neel Mechanical’s bid submission. FAMU verified on May 13, 1999, that Neel Mechanical was authorized to do business in Florida and held the requisite Florida license to perform the work required by the project. Centrifugal chiller specifications and York's letter of "intent to protest" Section 15685-1 of the Technical Specifications included in the Project Manual contains the specifications for the Centrifugal Chillers - Water Cooled to be installed as part of Project BR-389. Those specifications provide in pertinent part: PART 2 - PRODUCTS MANUFACTURERS Available Manufacturers: Subject to compliance with requirements, provide centrifugal chillers from one of the following: Trane Co., The York Int'l. UNIT DESCRIPTION: * * * Refrigerant: Chiller shall be provided with low pressure refrigerant HCFC-123. The size of the chiller specified for Project BR-389 was 2200 tons. 6/ Lane Jackins is the owner of Applied Mechanical Equipment and is a manufacturer's representative for York. He reviewed the technical specifications for the chiller contained in Part II of Section 15685-1 of the Technical Specifications for Project BR-389 and determined that York could not furnish a chiller that met the specifications. York does not manufacture a chiller of 2200 tons that uses R123 refrigerant, although it uses R123 refrigerant in smaller machines up to 750 tons. The equipment manufactured by York in the 2,000-ton range uses R134A refrigerant, which operates at different pressures than R123. The York equipment using R134A refrigerant is of an entirely different design than that using R123 refrigerant. In addition, York does not manufacture a chiller with the voltage required by the project specifications. Three or four days before the bids were to be submitted, either Mr. Sullivan or Mr. Lang spoke with Mr. Jackins about York's providing Neel Mechanical with a price for the chiller. Mr. Jackins responded that York would not submit a price for the equipment because York did not manufacture a chiller that would meet the technical specifications included in the bid documents. The Instructions to Bidders in the Project Manual provide: B-12 Basis for Bidding - Trade Names For clarity of description and as a standard of comparison, certain equipment and materials have been specified by trade names or manufacturers. To insure a uniform basis for bidding, the Bidder shall base the Proposal on the particular systems, equipment or materials specified and approved substitutes as provided in Paragraph 3.19, Substitutes, of the General Conditions. After bids are received, no equipment or materials will be approved as a substitute for the specified product. Paragraph 3.19 of the General Conditions provides: Substitutions Substitutions for a specified system, product or material may be requested of the Architect/Engineer, and the Architect/Engineer's written approval must be issued as an addendum before substitutions will be allowed. All requests for substitutions must be submitted prior to the opening of bids, and approvals shall be granted no less than seven (7) days prior to the bid date. Substitutions requested after that date will receive no consideration. Substitutions are changes in materials, equipment, methods, or sequences of construction, design, structural systems, mechanical, electrical, air conditioning controls, or other requirements of the Drawings or Specifications. (Emphasis in original.) In the portion dealing with "SPECIFICATIONS AND DRAWINGS," Section 15010 of the Technical Requirements, "MECHANICAL REQUIREMENTS," provides as follows: By submitting a bid for equipment or material other than the "Design Basis Equipment" (i.e., that which is shown on the Contract Drawings), the Contractor: Represents that he has personally investigated the proposed substitute product and determined that it is equal or superior in all respects to that specified and complies with all the requirements set forth in Paragraph 3.19 of the General Conditions; Certifies that the cost data presented is complete and includes all related costs under this Contract but excludes costs under separate contracts, and excludes the Engineer's redesign costs, and waives all claims for additional costs related to the substitution which subsequently become apparent; Will coordinate the installation of the accepted substitute, making such changes as may be required for the work to be complete in all respects; and, Certifies that the proposed equipment meets the requirements of the Contract Documents. Neither York nor any prospective bidder on Project BR-389 requested within the time limits specified in Paragraph 3.19 of the General Conditions that a York product be substituted for the chiller specified for Project BR-389. Mr. Lang contacted Craig Allen at Bosek, Gibson a day or two before bids were to be submitted and told Mr. Allen that York was not able to provide a chiller that met the project specifications. According to Mr. Lang, Mr. Allen responded that he "was totally surprised that they [York] didn't have a machine that was going to meet this spec." 7/ Mr. Lang based Neel Mechanical's bid on pricing information it received from Trane, which manufactures a chiller that meets the project specifications. An additional reason Mr. Lang based Neel Mechanical's bid on the Trane equipment was his belief that, all things being equal, FAMU preferred to have Trane equipment installed in Project BR-389 because other chillers installed at FAMU were manufactured by Trane. Mr. Lang believed that the specifications for the chiller had been deliberately drawn to require use of Trane equipment. In a letter dated May 11, 1999, the day the bids for Project BR-389 were submitted and opened, Mr. Jackins notified FAMU's Office of Facilities Planning and Construction that York intended to protest the bid on Project BR-389. Mr. Jackins stated in the letter: The chiller as specified is a flat specification. There is only one manufacturer that will meet the criteria as spelled out in the contract documents. This is not in the best interest of the University System of Florida or the State of Florida. An official protest outlining all the proprietary items will be forthcoming. The letter was sent via facsimile on May 11, 1999, prior to the time the bids were opened. Mr. Jackins believed that the "flat specification" was not in the best interest of the university because it precluded competitive pricing for the chiller. Mr. Sullivan learned on May 11 or May 12, 1999, that York intended to file a bid protest. Believing that Neel Mechanical would be awarded the contract as the apparent low bidder, Mr. Sullivan met with Mr. Jackins and several employees of Neel Mechanical, including Greg Lang, at which time Mr. Sullivan proposed an alternative to York's filing a bid protest. Mr. Sullivan told Mr. Jackins that, in his opinion, the situation could best be handled through a meeting between Neel Mechanical, Mr. Jackins, Mr. Houston, and the project engineers. According to Mr. Sullivan's plan, Mr. Jackins could present York's pricing, and FAMU, with the engineers’ assistance, could decide if they wanted to switch from the equipment specified in the bid documents to York equipment. If FAMU agreed to accept the York equipment, then, if it were awarded the contract, Neel Mechanical would purchase the York equipment rather than the Trane equipment Neel Mechanical had included in its proposal. After some discussion, Mr. Jackins agreed with Mr. Sullivan's proposed solution. Post-bid activity from the perspective of Neel Mechanical Immediately after the bids were opened, Craig Allen, an employee of Bosek, Gibson telephoned Mr. Lang and asked if Neel Mechanical was still happy with its bid. According to Mr. Lang, Mr. Allen stated that "this is a standard practice of mine on bid day to call the apparent low bidder and just make sure that they haven't found some colossal error in their math or whatever that made them low." 8/ Mr. Lang told Mr. Allen that Neel Mechanical was still happy with its bid. After this conversation, Mr. Lang waited for the letter from FAMU awarding the contract to Neel Mechanical. He was not concerned that the award was not made immediately because, in his experience, some time always passed between bid opening and the time the winning bidder received the contract. However, in anticipation of the award of the contract, Neel Mechanical proceeded to talk with subcontractors, to start scheduling the project, and to line up equipment that it would need to purchase for work on the project. Neel Mechanical employees also made several visits to the site of the project. At some point after the bids were opened, Mr. Sullivan heard that the procurement officials at FAMU were discussing with FAMU's legal department the issues of Neel Mechanical's failure to affix the corporate seal to its bid and the ramifications of York’s threatened bid protest. Mr. Sullivan responded by telephoning the office of FAMU's general counsel. He spoke with Faye Boyce about these issues and told her that he considered his failure to affix the corporate seal to Neel Mechanical's bid to be insignificant. He also advised her that he had worked out an arrangement with the representative of York whereby York would withdraw its protest and Neel Mechanical would talk with the engineers about the York chiller so a decision could be made whether they wanted to use the York equipment or stay with the Trane equipment which met the project specifications. In a subsequent telephone conversation with Ms. Boyce, Mr. Sullivan received the impression that she had looked into the issues he had raised in their previous telephone conversation. Mr. Sullivan could not recall Ms. Boyce's exact words, but had the impression from their conversation that the contract award to Neel Mechanical had been approved and that confirmation would be sent out shortly. At some point after Mr. Sullivan's conversation with Ms. Boyce, Greg Lang telephoned Henry Swift to find out the status of the contract award. Mr. Swift told Mr. Lang that, in Mr. Lang's words, "the problem had been reviewed and found to be insignificant, and . . . that the letter of intent to award had already been made." 9/ According to Mr. Lang, Mr. Swift told him that FAMU would notify the bidders of the intent to award the contract to Neel Mechanical. On the basis of this conversation, Mr. Lang believed that Neel Mechanical would receive a letter "just any day." When Neel Mechanical did not receive a letter, Mr. Lang telephoned Mr. Swift again. According to Mr. Lang, Mr. Swift stated that he did not know why the matter was being held up. After this second conversation with Mr. Swift, Mr. Lang telephoned Mr. Houston several times but did not receive a return call. Mr. Lang then wrote a letter to Mr. Houston, dated July 9, 1999, in which he inquired about the status of the contract award: It has now been almost two months since you received bids for this project, and as the low bidder we have still not received notification of your intent to award. We have had several telephone conversations with the attorney representing the regents in this matter, and we were lead [sic] to believe that we would have received information before this time. Please review this matter and call us. If there are outstanding issues which concern you, we would like to know about them and work with you to get them resolved. Post-bid activity from the perspective of FAMU Mr. Houston and members of his staff considered the omission of the corporate seal to be a minor deficiency in Neel Mechanical's bid proposal. Nonetheless, even though Neel Mechanical had been allowed to seal the bid Proposal Form, Mr. Houston asked FAMU's Office of General Counsel to conduct research and determine if the deficiency was one that could be waived. Mr. Houston was not involved in drawing up the technical specifications for Project BR-389; rather, he relied on the project engineers to be familiar with the products to be used in the project. Mr. Houston advised the project engineers that he wanted a competitive bid, and, because the chiller was a major component of the project, he instructed the engineers to prepare specifications that could be met by equipment produced by at least two manufacturers. In a letter dated May 18, 1999, Craig Allen, the engineer at Bosek, Gibson who prepared the specifications for Project BR-389, notified Mr. Houston that he was not aware until the "notice of protest" was received from York that York could not provide a chiller of the required capacity which used R123 refrigerant. Mr. Allen advised Mr. Houston that Mr. Jackins, the York representative, had indicated that he wanted to meet with Mr. Allen to discuss York's chiller selections for the project. A recommendation that the contract be awarded to Neel Mechanical was signed on June 8, 1999, by Phyllis Nottage, the Assistant Director of FAMU's Office of Facilities Planning and Construction; on June 10, 1999, by Mr. Houston; on June 14, 1999, by Louis Murray, an Associate Vice President of FAMU; and on June 14, 1999, by Robert Carroll, a Vice President of FAMU with supervisory authority over the Office of Facilities Planning and Construction. The recommendation was contained in a document entitled "Award of Construction Contract," which provided as follows: On May 11, 1999, bids were received for the above-referenced project within the approved budget for the Base Bid and Alternates One (1) through (2), in the total amount of $3,996,400. The requirements for the Minority Business Enterprise Plan as set forth in the project specifications have been satisfied by the Contractor. The consulting Architect/Engineer and the University Facilities Planning and Construction Office recommend the award of this contract to Neel Mechanical Contractors, Inc. President Humphries signed the Award of Construction Contract on June 17, 1999. The preparation and signing of the Award of Contract form and the preparation of the Letter of Intended Decision were part of the bid review process, but Mr. Houston considered them preliminary, without effect until the final decision on the contract award was made and the bidders were formally advised of FAMU's intended decision with respect to the award of the contract. On June 21, 1999, Mr. Houston received a telephone call from Kenneth Ogletree, Director of the Board of Regents’ Office of Facilities Planning, 10/ in which Mr. Houston was advised that the Board of Regents had received an inquiry from a legislator in reference to Project BR-389 and requesting that Mr. Houston prepare a response to the legislator's inquiry. Mr. Ogletree sent Mr. Houston, via facsimile on June 21, 1999, a copy of a letter dated May 28, 1999, from Carey Huff, President of Bayou Mechanical, to Durell Peaden, a member of the Florida House of Representatives and a State Representative from District In the letter, Mr. Huff complained that Neel Mechanical, although apparent low bidder for Project BR-389, had failed to seal the bid Proposal Form and the Bid Bond and that, therefore, Neel Mechanical's bid was non-responsive. Mr. Carey requested that Representative Peaden contact FAMU so that Bayou Mechanical would be awarded the contract for the project as lowest responsive bidder. Mr. Carey stated in his May 28, 1999, letter to Representative Peaden that the college had refused to allow Bayou Mechanical to examine Neel Mechanical's bid but that Mr. Houston had informed them that Neel Mechanical had failed to seal its bid properly. 11/ Mr. Ogletree also sent Mr. Houston, via facsimile on June 21, 1999, a copy of a letter from Representative Peaden to Dr. Adam W. Herbert, Chancellor of the State University System. In his letter, Representative Peaden asked that Dr. Herbert look into the matter and "see that all equity was followed in the bid process." In response to the Board of Regents' request that he respond to Representative Peaden's inquiry, Mr. Houston prepared a letter dated June 22, 1999. In this letter, which was directed to Mr. Ogletree, Mr. Houston stated that FAMU wished to award the contract for Project BR-389 to Neel Mechanical as the low bidder on the project. Mr. Houston stated that FAMU considered Neel Mechanical's failure to affix the corporate seal on the bid Proposal Form and the Bid Bond to be a minor discrepancy. Mr. Houston further stated that FAMU's Office of General Counsel agreed with the conclusion regarding the corporate seal issue and recommended that the contract be awarded to Neel Mechanical. Finally, Mr. Houston advised Mr. Ogletree that President Humphries had signed the "Award of Construction Contract" form and that Mr. Houston's office was preparing "Letters of Intended Decision" to be sent to the bidders. The final decision on the contract award had not been made on June 10, 1999, when Mr. Houston signed the recommendation that the contract for Project BR-389 be awarded to Neel Mechanical, nor had it been made on June 22, 1999, when Mr. Houston wrote his letter to Mr. Ogletree. Rather, on June 22, 1999, the issues raised with respect to the bid process for Project BR-389 were still being reviewed by Mr. Houston and his staff and by FAMU's Office of General Counsel. The decision to reject all bids on Project BR-389 was made on June 24, 1999. On that date, Mr. Houston met with Vice President Murray, FAMU's attorney, and the Assistant Director of the Office of Facilities Planning and Construction, and the issues relating to the bidding process for Project BR-389 were reviewed. Mr. Houston identified these issues as Neel Mechanical's failure to seal its bid Proposal Form and its Bid Bond; potential protests from York and from Bayou Mechanical; and the problem relating to the technical specifications for the chiller. Of these issues, Mr. Houston considered the most serious the fact that, of the two manufacturers listed in the bid specifications, only Trane could provide the chiller for Project BR-389. The chiller was a major part of the project, and Mr. Houston wanted at least two sources for the chiller in order to encourage competition so that FAMU would get the lowest possible price for the project. Mr. Houston was also concerned that the specifications for the chiller created a de facto "sole source" bid and that the bid solicitation would, therefore, be illegal because FAMU didn't satisfy the statutory requirements necessary for it to specify that the chiller be purchased from a sole source. 12/ FAMU's attorney advised the participants at the June 24, 1999, meeting that the legal department had found no precedent within the State University System for waiving the requirement in the bid documents that the bid Proposal Form and the Bid Bond be sealed with the bidder's corporate seal. The participants at the meeting considered all of the outstanding issues and decided that it would be in the best interests of FAMU to reject all bids submitted on May 11, 1999, for Project BR-389. After the decision to reject all bids was made, Mr. Houston marked an "X" through the Award of Construction Contract form signed by President Humphries, and he prepared letters notifying the bidders of the intent to reject all bids for Project BR-389. Neel Mechanical's bid protest In a letter to Neel Mechanical dated July 6, 1999, Mr. Houston stated: Bids on the above referenced project were opened May 11, 1999. However, we regret to inform you that all Bids have been rejected as in the best interest of the University. This project is presently being re-advertised in the Florida Administrative Weekly. The University apologizes for the time it has taken to reach this decision. We trust that you will cooperate with our course of action and look forward to receiving a proposal from you at the next opening. Thanks for your continued interest in the State University System's Construction Program. The envelope containing Mr. Houston's July 6, 1999, letter was post-marked July 9, 1999, and the letter was received by Neel Mechanical on Tuesday, July 13, 1999. The Instructions to Bidders in the Project Manual provide: Rejection of Bids The Owner reserves the right to reject any and all bids when in the opinion of the Owner such rejection is in the best interest of the Owner. Paragraph B-1 of the Instructions to Bidders provides that the Board of Regents is the owner of the project. On July 13, 1999, after Neel Mechanical received the letter from Mr. Houston notifying it that all bids on Project BR- 389 had been rejected, Mr. Sullivan and Greg Lang went to Mr. Houston's office to urge him to rescind the decision and award the contract to Neel Mechanical. Mr. Sullivan told Mr. Houston that they felt that the issue regarding the corporate seal was insignificant. At this time, Mr. Sullivan also told Mr. Houston that he and York had reached an agreement whereby York would withdraw its protest and Neel Mechanical would present the York product to the University and let the University decide if it wanted to go with the Trane chiller or switch to a York product. Mr. Sullivan thought that Mr. Houston was sympathetic to Neel Mechanical but that the decision had been made by the administration and the legal department. Mr. Sullivan also got the impression that the decision to reject all bids was based on the corporate seal issue. On July 13, 1999, Neel Mechanical hand-delivered its Notice of Intent to Protest Bid to Samuel J. Houston, Director of the Office of Facilities Planning and Construction at Florida A&M University and to FAMU's Office of General Counsel. There is no dispute that the Notice of Intent to Protest Bid was actually received in Mr. Houston's office on July 13, 1999. On July 23, 1999, Neel Mechanical hand-delivered its Formal Written Protest and Petition for Formal Administrative Proceedings to Sam Houston, Director, Florida A&M University, Facilities Planning Department, Plant Operations Facility, Building A, Room 100, 2400 Wahnish Way, Tallahassee, Florida 32307 and to FAMU's Office of General Counsel. Also on July 23, 1999, a copy of the Formal Written Protest and Petition for Formal Administrative Proceedings was sent by United States Mail to the Board of Regents, Office of General Counsel, 325 West Gaines Street, Suite 1454, Tallahassee, Florida 32399-1950. There is no dispute that the Formal Written Protest and Petition for Formal Administrative Proceedings was actually received in Mr. Houston's office on July 23, 1999. The Instructions to Bidders in the Project Manual dated October 16, 1989, provide: Bid Protest To be considered, a bid protest must be received by the Director, Capital Programs, Florida Board of Regents, 1601 Florida Education Center, 325 West Gaines Street, Tallahassee, Florida 32399-1950, as provided in Section 120.53, Florida Statutes. Failure to file a notice of protest in this manner shall constitute a waiver of the Bidder's right to proceedings under Chapter 120, Florida Statutes. * * * B-26 Special Conditions Bidders shall be thoroughly familiar with the Special Conditions and their requirements. (Emphasis added.) Supplement J to the Project Manual, consisting of pages 1 through 11 and dated February 13, 1996, provides in pertinent part: (This supplement revises portions of the Project Manual for State University System projects dated October 16, 1989, and supersedes any other previously issued supplements related to the referenced topics.) Revise the Instructions to Bidders Section of the Project Manual as Follows: * * * Revise Paragraph B-22, Bid Protest, to read as follows: B-22 Bid Protest Any person who is affected adversely by the Board of Regents decision or intended decision shall file with the Associate Vice Chancellor, Capital Programs, Florida Board of Regents, 1602 Florida Education Center, 325 West Gaines Street, Tallahassee, Florida 32399-1950, a notice of protest in writing within 72 hours, excluding Saturday, Sunday, and State legal holidays, after receipt of the bidding documents if the protest is directed toward the bidding conditions or after the notice of the Board of Regents decision or intended decision on contract award or bid rejection if the protest is directed toward contract award or bid rejection. Thereafter, a formal written protest by petition in compliance with Section 120.53(5), and Section 120.57, F.S., must be filed with the Associate Vice Chancellor, Capital Programs, Florida Board of Regents, 1602 Florida Education Center, 325 West Gaines Street, Tallahassee, Florida 32399-1950, within ten (10) days after the date the notice of protest was filed. Failure to file a timely notice of protest of [sic] failure to file a timely formal written protest petition shall constitute a waiver of protest proceedings. Any protest filed prior to receipt of the notice of the Board of Regents decision or intended decision will be considered abandoned unless renewed within the time limit provided for protests. (Emphasis added.) Supplement K to the Project Manual, consisting of pages 1 through 5, provides in pertinent part: SUPPLEMENT TO PROJECT MANUAL ISSUED BY FLORIDA A&M UNIVERSITY REGARDING PARAGRAPH B-26, SPECIAL CONDITIONS (February 1999 Revision) B-26 SPECIAL CONDITIONS - This supplement modifies paragraph B-26 by adding and clarifying bidding requirements and instructions. * * * PROTEST PROCEDURES: This paragraph supersedes the paragraph (No. B-22) under the general terms and conditions whereby the notice of intended protests or written formal protests including bonding requirements from bidders must be submitted to: Mr. Sam Houston, Director, Florida A&M University, Facilities Planning Department, Plant Operations Facility, Building A, Room 100, 2400 Wahnish Way, Tallahassee, FL 32307. A bid tabulation with the recommended award(s) will be posted at the address indicated in Paragraph B-26, sub- paragraph 6 (Posting of Bid Tabulation). Any notice of protest or formal written protest to the award or intended award which is filed before the bid tabulation posting is null and void. To be considered, a notice of protest or formal written protest must be filed within the time limits set forth in Section 120.57(3)(b), Florida Statutes. Any notice of protest or formal written protest to the specifications issued by the University must be filed within the time limits set forth in Section 120.57(3)(b), Florida Statutes. Any notice of protest or formal written protest to any amendment issued by the University must be filed within the time limits set forth in Section 120.57(3)(b), Florida Statutes. (Emphasis added.) The instructions regarding the filing of bid protests in Supplement K supersede the instructions in Supplement J, which is dated February 13, 1996, and in the Instructions to Bidders in the Project Manual, which are dated October 16, 1989. Summary The evidence presented by Neel Mechanical is sufficient to establish that it timely filed its Notice of Intent to Protest and its Formal Written Protest and Petition for Formal Administrative Proceedings by hand-delivering the documents to Mr. Houston, at his office on the FAMU campus. The evidence presented by Neel Mechanical is not sufficient to establish with the requisite degree of certainty that FAMU acted fraudulently, arbitrarily, illegally, or dishonestly in deciding that it was in the best interest of FAMU to reject all of the bids submitted on May 11, 1999, for Project BR-389. First, FAMU's concerns that, by inadvertently including a technical specification that could be met by only one manufacturer, it had limited competition with respect to the chiller to be used in Project BR-389 and had inadvertently put out an illegal "sole source" specification were legitimate concerns. Mr. Houston instructed the engineer who prepared the technical specifications that he wanted the specifications drawn so that at least two manufacturers could provide the product, and the engineer prepared specifications relating to the "available manufacturers" which clearly contemplated that a chiller meeting the technical specifications could be provided by both York and Trane. FAMU did not act arbitrarily when it considered as one factor underlying the decision to reject all bids the lack of precedent in the State University System for waiving the requirement that the bid Proposal Form and Bid Bond carry the corporate seal of a corporate bidder. The evidence submitted by Neel Mechanical is not sufficient to establish with the requisite degree of certainty that the corporate seal issue was ultimately the only or even the major factor on which FAMU's decision to reject all bids was based. Mr. Houston identified the possibility that bid protests would be filed by York and by Bayou Mechanical as factors which FAMU considered in deciding to reject all bids. Nonetheless, the evidence taken as a whole permits the inference that the focus of the concern about the potential bid protests was not on avoiding the protests but on the validity of the issues raised by York and Bayou Mechanical. Accordingly, FAMU did not act arbitrarily when it considered these potential bid protests as one factor contributing to the decision to reject all bids. The evidence presented by Neel Mechanical is not sufficient to establish that the "Award of Contract" form executed by President Humphries on June 17, 1999, or Mr. Houston’s June 22, 1999, letter to Mr. Ogletree bound FAMU to award the contract to Neel Mechanical or that the subsequent decision to reject all bids defeated the purpose of the competitive bidding process.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that Florida Agricultural and Mechanical University enter a final order dismissing the Formal Written Protest and Petition for Formal Administrative Proceedings filed by Neel Mechanical Contractors, Inc., and denying Neel Mechanical's Motion for Assessment of Attorney's Fees, insofar as it is based on the provisions of Section 120.595, Florida Statutes. Based on the foregoing Findings of Fact and Conclusions of Law, Neel Mechanical's Motion for Assessment of Attorney's Fees, insofar as it is based on the provisions of Section 120.569(2)(e), Florida Statutes, is denied. DONE AND ENTERED this 12th day of November, 1999, in Tallahassee, Leon County, Florida. PATRICIA HART MALONO Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 12th day of November, 1999.

Florida Laws (11) 120.53120.569120.57120.595120.6814.021255.04255.0516255.0525255.24890.206 Florida Administrative Code (8) 28-106.1046C-14.0026C-14.0186C-14.0206C-14.0216C-14.0236C3-6.0046C3-6.007
# 8
OFFICE SYSTEMS CONSULTANTS vs. DEPARTMENT OF HIGHWAY SAFETY AND MOTOR VEHICLES, 87-000304BID (1987)
Division of Administrative Hearings, Florida Number: 87-000304BID Latest Update: Apr. 10, 1987

The Issue The following issues were raised in the challenge of the award of the bid: Did Harris/3M fail to comply with Special Condition 28 of the Invitation to Bid, which required each bidder to provide references from two customers having similar equipment? Did the Department request a demonstration of the bid equipment under Special Condition 15? If such a demonstration was requested, did Harris/3M comply with the request? Were the machines bid by Harris/3M available under terms of General Condition 4(d)? Did the machines bid by Harris/3M comply with General Condition 4(f) requiring that the equipment bid carry the Underwriter's Laboratory listing? In response to Harris/3M's Motion for Directed Verdict on issue number 5, the Hearing Officer granted the motion on a finding that no evidence had been presented on this issue by the Petitioner. The Petitioner's compliance with the specifications was not at issue.

Findings Of Fact On or about December 15, 1986, the Department issued and advertised its Invitation to Bid 3162-86 related to the acquisition of 15 microfilm reader/printers for use in searching, reading and printing motor vehicle documents which had been microfilmed by the Department of Highway Safety. Microfilm reader/printers are essentially units of hardware into which cartridges of microfilm are inserted and the microfilm is passed through a camera which reflects the images of the microfilm onto a screen from which information can be read and copies printed. The Invitation to Bid required that the equipment must have a "controller," a device for automatically locating specific microfilm documents by the use of coded information or "blips" on the film. On or about January 5, 1987, responses to the Department's bid were submitted by Petitioner OSC and Intervenor, Harris/3M, together with bids from other bidders whose bids are not an issue in these proceedings. All bids were opened on January 5, 1987. The equipment bid by Harris/3M was the Model MFB1100 Reader/Printer with a "page search" kit or controller. Special Condition 28 of the Invitation to Bid states: "28. REFERENCES The bidder shall supply with his bid the names, addresses and telephone numbers of two references for whom the bidder has previously provided similar equipment being bid. If the bidder is unable to provide satisfactory references to the Department, the Department may, at its discretion, reject the bidder's bid if it determines that a responsive offer in full compliance with the bid speci- fications and conditions was not submitted. Failure to supply the references as required may result in rejection of the bid." (e.s.) Harris/3M provided two references in satisfaction of Special Condition Both of the references had versions of the Model MFB1100; however, neither of the references had the "controller" or page search kit, which was called for in the Invitation to Bid. Special Condition 28 was drafted by Merelyn Grubbs. According to Ms. Grubbs, the purpose of this requirement was to assure the Department that the bidder was responsible. "Similar" equipment is sufficient to assess the bidder's responsibility based upon machines made by the same manufacturer which performed essentially the same function. The MFB1100 without a page search kit is a "similar" machine. The two references provided were sufficient. Special Condition 15 states: DEMONSTRATIONS After opening of bid and prior to award of bid, the apparent low responsive bidder may be required to demonstrate to the Division of Administrative Services the equipment he proposes to furnish. If requested, a "working model" of the equipment bid and to be supplied in compliance with these specifications must be demonstrated in Tallahassee, Florida, within seven (7) calendar days from receipt of notification. If apparent low responsive bidder cannot successfully execute the demonstration, the Department shall revert to the next low responsive bidder and request demon- stration, continuing through the list of responsive bidders until a successful demonstration is achieved, the list of responsive bidders is exhausted or it is in the State's best interest to terminate the bid process. Demonstrations to be furnished at no expense to the Department." On January 7, 1987, Mr. Ray Boetch, the supervisor of the division within the Department of Highway Safety where the reader/printers would ultimately be used, wrote a memorandum to Merelyn Grubbs requesting that a demonstration be made on the Harris/3M Model MFB1100 Reader/Printer prior to the awarding of the bid. Mr. Boetch also discussed the matter with Ms. Grubbs indicating his primary concern was verifying the quality of the prints produced by the machine and whether it could print half pages. Ms. Grubbs spoke with Nick Vuillemot of Harris/3M about a demonstration of the equipment in Tallahassee. In these discussions, Harris/3M offered to fly representatives of the Department to St. Paul, Minnesota, the home office of the manufacturer, for a demonstration of the equipment. This was because Harris/3M had only two prototypes of the equipment and it was more economical for Harris/3M to fly Department personnel to Minnesota for purposes of the demonstration than to disassemble, ship to Tallahassee and reassemble the prototype for a demonstration. The Department declined to accept Harris/3M's offer. The Department accepted instead a demonstration of a Model MFB1100 without the controller or page search kit at the Division of Elections in Tallahassee, Florida. The MFB1100 without controller does not meet the specifications in the Invitation to Bid. The "controller" or page search kit is of modular construction in the MFB1100, which can be ordered with or without the controller or page search kit. However, the bid specifically calls for a reader/printer with a page search device. Following the demonstration of the MFB1100 without page search capability, the Department officially posted its bid tabulations on January 12, 1987, designating Harris/3M as the low and responsive bidder and OSC was the next low and responsive bidder. Item 4 (d). Conditions and Packaging of the General Conditions of the Invitation to Bid provides as follows: It is understood and agreed that any item offered or shipped as a result of this bid shall be new, current standard production model available at the time of bid. (e.s.) Item 18. Delivery Schedule of the special conditions required delivery of the items bid within 30 days of the bid award or, in the alternative, a substitute item acceptable to the Department at no cost to the Department. The bid submitted by Harris/3M certified that delivery of all 15 units would be delivered within 30 days after receipt of a purchase order. Although the Harris/3M Model MFB1100 Reader/ Printer without page search had been on the market for a number of months prior to the issuance of the Invitation to Bid, the Model MFB1100 with page search had not been authorized for sale by the manufacturer until late November 1986. At the time demonstration was requested, only two prototypes existed of the MFB1100 with page search capability. As of the date of the hearing on February 11, 1987, no Model MFB1100 Reader/Printers with page search capability had been installed in any customer location within the United States. The Petitioner did not present any evidence to support its claim that the MFB1100 Reader/Printer with page search did not have a UL listing.

Florida Laws (4) 120.53287.032287.042672.205
# 9
SPINELLA ENTERPRISES, INC. vs DEPARTMENT OF ENVIRONMENTAL PROTECTION, 08-003380BID (2008)
Division of Administrative Hearings, Florida Filed:Lauderdale Lakes, Florida Jul. 14, 2008 Number: 08-003380BID Latest Update: Nov. 04, 2008

The Issue The issue in this bid protest is whether Respondent acted arbitrarily when it decided to reject all of the bids it had received in response to a solicitation seeking bids on a contract for roof repairs.

Findings Of Fact On January 10, 2008, the Florida Department of Environmental Protection (the "Department" or "DEP") issued an Invitation to Bid (the "ITB"), the purpose of which was to solicit competitive bids from qualified contractors on a project whose scope of work envisioned repairs to the wind-damaged roofs of several buildings located on the grounds of the Hugh Taylor Birch State Park in Fort Lauderdale, Florida. Some of the buildings to be repaired were single-family residences. Work on these structures accordingly needed to conform to the requirements prescribed in the 2007 Manual of Hurricane Mitigation Retrofits for Existing Site-Built Single Family Residential Structures (the "Manual"), which the Florida Building Commission (the "Commission"), following an explicit legislative directive, see Section 553.844(3), Florida Statutes,1 recently had adopted, by incorporative reference, as a rule. See Fla. Admin. Code R. 9B-3.0475 (2007).2 The Rule had taken effect on November 14, 2007, giving the Manual's contents the same status and force as the Florida Building Code. Id. Just before the Department issued the ITB, the Commission had approved, at a meeting on January 8, 2008, a modified version of the Manual, which it called the 2007 Manual of Hurricane Mitigation Retrofits for Existing Site-Built Single Family Residential Structures, Version 2 (the "Revised Manual"). In consequence of the Commission's approval of the Revised Manual, the Florida Department of Community Affairs ("DCA") caused a Notice of Proposed Rule Development to be published on January 25, 2008, in the Florida Administrative Weekly. This official advertisement announced that the Commission intended to amend Rule 9B-3.0475, so that its incorporative reference would mention the Revision Manual instead of the Manual. See 34 Fla. Admin. W. 461-62 (Jan. 25, 2008).3 DCA caused a Notice of Proposed Rule respecting the intended revision of Rule 9B-3.0475 to be published on February 1, 2008, in the Florida Administrative Weekly. See 34 Fla. Admin. W. 605 (Feb. 1, 2008).4 On February 5, 2008, the Department issued Addendum No. 4 to the ITB (the "Addendum"). The Addendum provided in pertinent part as follows: Bidders shall bid the project as specified despite the recent change in Rule 9B-3.0475 relating to hurricane mitigation retrofits. Any additional water barrier will be accomplished by Change Order after award of the contract. (The foregoing provisions of the Addendum will be referred to hereinafter as the "Directive"). On February 12, 2008, the Department opened the bids it had received in response to the ITB. Ten (out of 12) of the bids submitted were deemed responsive. The bid of Petitioner Spinella Enterprises, Inc. ("Spinella") was one of the acceptable bids. On February 19, 2008, DEP posted notice of its intent to award a contract to the lowest bidder, namely Spinella, which had offered to perform the work for $94,150. The second lowest bidder was The Bookhardt Group ("Bookhardt"). Bookhardt timely protested the intended award, raising several objections, only one of which is relevant here. In its formal written protest, dated March 3, 2008, Bookhardt alleged that "[t]he new State of Florida law F.S. 553.844 was not part of the solicitation." On April 4, 2008, Rule 9B-3.0475, as amended to incorporate by reference the Revised Manual, took effect. See Fla. Admin. Code R. 9B-3.0475 (2008). On May 16, 2008, DEP posted notice of its intent to reject all bids received in response to the ITB. (Bookhardt's protest, which remained pending, had never been referred to DOAH for a formal hearing.) Spinella timely protested the Department's decision to reject all bids. In an email sent to Spinella on July 22, 2008, DEP's counsel explained the rationale behind the decision: The reason the Department rejected all bids follows. When the Department posted the notice of intent to award the contract to Spinella Enterprises, Inc., the second low bidder (Bookhardt Roofing) protested the intent to award. The second low bidder's basis for protesting the intended award was that Addendum 4 directed bidders to ignore certain rules of the Construction Industry Licensing Board [sic], which had become effective after the bid opening, which was not in accordance with the law. As a result, this may have caused confusion and the Department had no assurance that bidders were bidding the project correctly. In addition, the statement in Addendum 4 that the Department would add the required moisture barrier afterward by change order set up a situation where bidders had no idea how much the Department would be willing to pay for the change order. Further, the moisture barrier was not the only thing required by the new rules. Potential bidders may not have bid due to these uncertainties. The Department agreed with Bookhardt's assertions and rejected all bids . . . . Notwithstanding Spinella's protest, the Department issued a second invitation to bid on the project in question. As of the final hearing, the bids received in response to this second solicitation were scheduled to be opened on August 12, 2008. Ultimate Factual Determinations The Department's decision to reject all bids is premised, ultimately, on the notion that the Directive told prospective bidders to ignore an applicable rule in preparing their respective bids.5 If this were true, then the Directive could have been a source of potential confusion, as the Department argues, because a prudent bidder might reasonably hesitate to quote a price based on (possibly) legally deficient specifications. The Directive, however, did not instruct bidders to ignore an applicable, existing rule. Rather, under any reasonable interpretation, it instructed bidders to ignore a proposed rule and follow existing law. Such an instruction was neither confusing nor inappropriate. To be sure, the first sentence of the Directive——at least when read literally——misstated a fact. It did so by expressing an underlying assumption, i.e. that Rule 9B-3.0475 recently had been changed, which was incorrect. In fact, as of February 5, 2008, the Rule was exactly the same as it had always been. (It would remain that way for the next two months, until April 6, 2008).6 DEP's misstatement about the Rule might, conceivably, have confused a potential bidder, at least momentarily. But DEP did not factor the potential for such confusion into its decision to reject all bids, and no evidence of any confusion in this regard was offered at hearing.7 More important is that the unambiguous thrust of the Directive was to tell bidders to rely upon the "not recently changed" Rule 9B-3.0475, which could only have meant Florida Administrative Code Rule 9B-3.0475 (2007) as originally adopted, because that was the one and only version of the Rule which, to that point, had ever existed. Thus, even if the Department were operating under the mistaken belief, when it issued the Addendum, that Rule 9B-3.0475 recently had been amended; and even if, as a result, DEP thought it was telling prospective bidders to ignore an applicable, existing rule, DEP nevertheless made clear its intention that prospective bidders follow the original Rule 9B- 3.0475, which was in fact the operative Rule at the time, whether or not DEP knew it. Indeed, as any reasonable potential bidder knew or should have known at the time of the Addendum, (a) the Commission recently had approved the Revised Manual, but the contents thereof would not have the force and effect of law unless and until the Revised Manual were adopted as a rule, which had not yet happened; (b) the Commission had initiated rulemaking to amend Rule 9B-3.0475 so as to adopt the Revised Manual as a rule, but the process was pending, not complete; (c) Rule 9B-3.0475 had not been amended, ever; and, therefore, (d) the Manual still had the force and effect of law. See endnote 6. The Directive obviously could not alter or affect these objective facts. At bottom, then, a reasonable bidder, reviewing the Directive, would (or should) have concluded either (a) that the "recent change" which DEP had in mind was the Commission's approval of the Revised Manual (or the subsequent announcement of the proposed amendment to Rule 9B-3.0475) or (b) that DEP mistakenly believed the Rule had been changed, even though it had not been. Either way, a reasonable bidder would (or should) have known that the Department wanted bidders to prepare their respective bids based not on the Revised Manual, but the Manual. In other words, regardless of what DEP subjectively thought was the existing law, DEP clearly intended (and unambiguously expressed its intent) that bidders follow what was, in fact, existing law. This could not have confused a reasonable bidder because, absent an instruction to exceed the minimum required legal standards (which the Directive was not), a reasonable bidder would have followed existing law in preparing its bid, just as the Directive required. Once it is determined that the Directive did not, in fact, instruct bidders to ignore an applicable, existing law, but rather told them to rely upon the applicable, existing law (notwithstanding that such law might change in the foreseeable future), the logic underlying the Department's decision to reject all bids unravels. Simply put, there is no genuine basis in logic or fact for concluding that the Addendum caused confusion. The other grounds that DEP has put forward do not hold water either. Contrary to the Department's contention, the possibility that a Change Order would be necessary if an "additional water barrier" were required could not possibly have confused potential bidders or caused them to be uncertain about how much money the Department would be willing to pay for such extra work. This is because Article 27 of the Construction Contract prescribes the procedure for entering into a Change Order, and it specifies the method for determining the price of any extra work. See ITB at 102-05. The fact that the proposed amendment to Rule 9B-3.0475, if it were to be adopted and become applicable to the instant project, might require other additional work, besides a water barrier, likewise could not reasonably have caused potential bidders to refrain from bidding, for the same reason: The Construction Contract contains explicit provisions which deal with the contingency of extra work or changes in the work. Id. In sum, DEP's intended decision to reject all bids cannot be justified by any analysis that a reasonable person would use to reach a decision of similar importance. It is, therefore, arbitrary.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department enter a final order finding that its decision to reject all bids was arbitrary. Because the Department elected not to comply with the statutory directive to abate this procurement pending the outcome of Spinella's protest, with the result that the contract at issue possibly has been awarded already to another bidder; and because the choice of remedies for invalid procurement actions is ultimately within the agency's discretion, the undersigned declines to make a recommendation regarding the means by which DEP should rectify the harm to Spinella, but he urges that other appropriate relief be granted if Spinella cannot be awarded the contact. DONE AND ENTERED this 2nd day of October, 2008, in Tallahassee, Leon County, Florida. JOHN G. VAN LANINGHAM Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 2nd day of October, 2008.

Florida Laws (3) 120.569120.57553.844 Florida Administrative Code (2) 9B-3.0479B-3.0475
# 10

Can't find what you're looking for?

Post a free question on our public forum.
Ask a Question
Search for lawyers by practice areas.
Find a Lawyer