Elawyers Elawyers
Washington| Change
Find Similar Cases by Filters
You can browse Case Laws by Courts, or by your need.
Find 49 similar cases
OCEAN REEF CLUB, INC. vs. DEPARTMENT OF ENVIRONMENTAL REGULATION, 87-004660 (1987)
Division of Administrative Hearings, Florida Number: 87-004660 Latest Update: Sep. 20, 1988

Findings Of Fact Ocean Reef Club, Inc., is the developer of certain lands located on the northern end of Key Largo, Monroe County, Florida. The development began as a fishing village in the 1940's and now includes private residences, a marina, and residential docking facilities. Ocean Reef applied in 1982 to DER for a permit to construct a residential docking facility known as Fisherman's Wharf. The facility was to provide a number of parallel docking spaces with an access channel following an existing tidal creek to the northeast connecting to a waterway known as the Harbor House Basin. The permit was issued on October 5, 1984, authorizing construction of a 4-foot wide parallel dock approximately 600-feet long, the dredging of a turning basin through the excavation of approximately 1800 cubic yards of material and the dredging of some 200 cubic yards from an existing tidal creek along a 480 lineal foot length of the creek to a width of 5-feet; all located in No Name Creek, a tidal creek connecting Harbor House Marina to Pumpkin Creek, in Card Sound, Key Largo, Monroe County, Section 11, Township 59 South, Range 41 East. That permit was extended by a letter dated June 10, 1987, and now carries an expiration date of October 5, 1989. The existing permit held by Ocean Reef Club, valid until 1989, would allow the direct dredging of a tidal creek vegetated by seagrasses over a 400- foot length yielding a direct dredging of seagrasses of some 3000 square feet. During the two-year processing time leading to issuance of the permit, Ocean Reef sold a portion of the property comprising the access channel to third parties who now will not grant their permission authorizing channel construction across their property. As a result, in 1987, Petitioner requested a major modification to permit no. 440601649. Although Petitioner attempted to show that its change of plans had been inconsistently processed by DER as a new permit application when DER was obligated to treat it as a modification of a prior permit which would require no new application, processing, or permit, Petitioner was unable to do so. Petitioner's expert professional land surveyor, Joseph Steinocher,, concurred with DER witnesses Kelly Jo Custer and David Bishof that the Ocean Reef plan changes were so significantly altered as to constitute a wholly new project. Steinocher specifically indicated it was a "significant change in that there is no relationship between the two," and Custer, DER's marina permitting specialist, testified that DER's consistently applied policy is to require all such significant permit modifications to be processed de novo as wholly new permit applications because to do otherwise would not be in the public interest. Custer was also qualified as an expert in marine biology and water quality, and from Custer's viewpoint, the changed plans constitute a new and different project for many reasons but primarily because the project impacts on water which have been designated Outstanding Florida Waters (OFW) during the intervening years. The project revision/new permit application plans changed the configuration of the turning basin, providing for a kidney-shaped upland basin with the utilization of an additional portion of No Name Creek, extending Southeasterly toward the entrance of a water body known as Fisherman's Cove. Because the project initially proposed disturbance of wetlands and dredging of mangroves, a mitigation area of some 10,300 square feet was included in the plan. The original proposal called for the straightening of an oxbow in the existing tidal creek and the placement of fill through approximately one-half the reach of the tidal creek to gain access to the dredge area with the fill to be removed after construction. During the processing of the latest permit application, adverse comments were received from DER staff members, and the Petitioner modified the application to eliminate the straightening of the oxbow. The pending proposal involves the construction of 24 boat slips along a floating dock, the installation of boulder rip-rap, and the placement of culverts to allow access to a central island to remain after construction of the docking facility. As a result of prior permit agreements between the parties, Ocean Reef Club had conveyed approximately 730 acres to the State of Florida Board of Trustees of the Internal Improvement Fund by special warranty deed dated March 17, 1982. Petitioner asserted but failed to prove up that all construction involved in the pending proposal is landward of those lands either conveyed by that special warranty deed or otherwise in the control of the State of Florida and in fact would be wholly upon its own property. Even had the private property encapsulation of the construction been established, Petitioner's registered land surveyor admitted that the tidal creek entrance is within the limits of the deed to the State of Florida. Access for the proposed 24-slip facility will be through the existing tidal creek that has water depths ranging from minus 2.2 feet to in excess of minus 8 feet at low tide. The earlier proposal would have required only a small portion of the natural creek to be used by motor boats. The project contemplated in 1984 and the one which is the subject of the present litigation are not comparable either biologically nor legally. It is noted that one condition of the 1984 permit even required navigational barriers to be placed at the mouth of No Name Creek. Accordingly, it is specifically found that the significant plan changes render the pending Ocean Reef permit application truly a new project rather than a minor modification as contemplated by Chapter 17-12 F.A.C. Petitioner also attempted to demonstrate that DER's denial of the new permit application was inconsistent with its issuance of permits for similar marina projects in other locations. Neither these allegedly similar applications, supporting plans therefor, nor permits were offered in evidence for comparison. Moreover, for one reason or another, some of the named projects differed so much from the subject application that one witness, Kenneth L. Eckternacht, expert in hydrographic engineering, physical oceanography, and navigation, characterized the comparison as "apples to monkies." Some projects could only be compared to the applicant's proposal by one similar component, i.e. elimination of, and mitigation with regard to, mangroves. For this reason, Dr. Snedeker's limited testimony in this regard is discounted. Some projects could not be conclusively identified as within OFW. None involved the use of the type of creek system involved in the instant project. Ocean Reef Club also could not show that the current permit denial is inconsistent with the granting of the permit for the project as previously conceived in 1984, and which project cannot now be constructed due to Ocean Reef's sale of certain land to uncooperative third parties. As set forth in the foregoing findings of fact, the two projects are neither biologically nor legally identical or even clearly comparable. Petitioner's assertion that it has proposed special or enhanced mitigation because the existing permit, still valid until 1989 but now impossible to comply with, allows direct dredging of approximately 3,000 square feet while the present permit application, as modified, would not require dredging this 3,000 feet, is rejected. Under the new project plans, the proposed basin will be located immediately adjacent to the existing tidal creek which would provide the navigational access to and from the basin. The connection will be created between the basin and the creek by excavating only 100-150 square feet of mangroves which lie between the creek and the area of the proposed basin. In making the immediately foregoing finding of fact, the testimony of witnesses has been reconciled without imputing any lack of credibility to any of them. Respondent's expert, Kelly Jo Custer, expert in marine biology and water quality and also their agency marina specialist, testified that the cross-hatching on the project plans, if read to scale, confirms the testimony of Petitioner's witnesses that the square footage of mangroves to be removed is 100-150 square feet and that the cross-hatching must take precedence over the raw number copied onto the plans. The wetlands in and around the project site, including No Name Creek, are within an OFW, specifically the Florida Keys Special Waters. The project site is located in North Key Largo, approximately one-half mile north of John Pennekamp State Park within the Atlantic Ocean and adjacent to the Biscayne Bay/Card Sound Aquatic Preserve. All of these waters are Class III surface waters. The marina basin itself will be excavated to a depth of minus four feet mean low water. The 24 proposed boatslips will accommodate moorage of boats as large as 25 feet with a draft of two feet. The marina basin will enhance recreational values and channel, despite its greater depth, and at the inner portions of its several bends. It is also implausible that Petitioner's plans to limit boat size through condominium documents to be enforced through a homeowners association, to install mirrors, signalling devices, and latches at certain points along the creek, and to install tide staffs at creek entrances will prevent potential head-on boat collisions or bottlenecks in No Name Creek. It is equally implausible that these procedures can provide reasonable assurances that there will not be a chronic increase in water turbidity from increased use or damage to biota from propellers and boat impact. The witnesses generally concurred as to the present ecological status of No Name Creek. It contains Cuban shoalweed and turtlegrass scattered with varied density throughout, and especially found in two patches between the proposed basin and the point at which there is a drastic bend or oxbow in the creek. The seagrasses in the creek serve many valuable functions including providing a substrate upon which epiphytes may attach, and providing a source of food and refuge for fish and small invertebrates. Seagrasses also fix carbon which they absorb from the sediments and water column through photosynthesis. Green and red algae found throughout the creek provide habitat and carbon fixing functions similar to that provided by the seagrasses. Corals and sponges are present. Three species of sponge located in the creek are found only in the Florida Keys and nowhere else in the United States. Other creek biota include barnacles and oysters attached to mangrove roots, lobsters, anchovies, needlefish, grunts, mojarres, electric rays, various small fish, and invertebrates. Biological and botanical diversity is an important measure of the creek's rich ecological quality and value. The increased boat use of No Name Creek inherent in this dredging project will adversely affect the quality and diversity of the biota. In a creek of this configuration with mean low tide occurring roughly every 12 hours and NEAP tides approximately every two weeks, direct impact of boat propellers is a certainty. The shallowest parts of the creek tend to be limerock shelves which provide a hospitable substrate for the corals, and which are most susceptible to propeller damage, as are the seagrasses and sponges. Petitioner's assertion through Mr. Castellanos and Dr. Roessler that all boaters can be relied upon to employ tilt motors to best advantage in shallow water so as to avoid overhanging mangrove branches at the creek's edges (shores) and so as to keep their boats within the portion of the channel away from submerged mangrove roots and further can be trusted to proceed slowly enough to allow slow-moving water creatures to escape their propellers is speculative and unrealistically optimistic. Despite all good intentions, the strong currents of this creek and its meandering nature work against the average pleasure boater keeping to the narrow center channel. An even more compelling problem with this project is that increased sustained turbidity from propellers and boat movement within close range of the creek bottom will scour the creek bottom and/or stir up the bottom sediment on a regular basis. Once suspended, bottom particles will be redeposited on the seagrasses, impeding photosynthesis and smothering the sponges and corals. Upon the testimony of Custer, Echternacht, and Skinner, and despite contrary testimony of Roessler and Larsen, it is found that the admittedly strong currents in the creek will not flush the particles sufficiently to alleviate the loose sediment problem, and may actually exacerbate the chronic turbidity problem. Strong currents can create a cyclical situation in which, as the seagrasses die or are uprooted, even more particulate matter is loosened and churned up. Chronic turbidity of No Name Creek has the potential of violating the applicable water quality standards for biological integrity, for turbidity, and for ambient water quality. These impacts will not be offset by Petitioner's creation of 38,100 square feet of new underwater bottom because, although this new area will become vegetated, it will never be as rich or as diverse as the existing bottom. This is also true of the pilings and rip rap in regard to sessile animals/barnacles. Petitioner's plan to replant red mangroves over 10,300 square feet may be sufficient in mitigation of the loss of 100-150 square feet of mangroves by itself (see Finding of Fact 16) but for the foregoing reasons, it does not constitute full mitigation for the new permit application. The project will be of a permanent nature. The project will not adversely affect significant historical and archeological resources.

Recommendation Upon the foregoing findings of fact and conclusions of law, it is recommended that a final order be entered denying the requested permit. DONE and RECOMMENDED this 20th day of September, 1988, at Tallahassee, Florida. ELLA JANE DAVIS, Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 20th day of September, 1988. APPENDIX TO RECOMMENDED ORDER DOAH Case No. 87-4660 The following constitute specific rulings upon the parties' respective proposed findings of fact (PFOF). Petitioner's PFOF: 1, 2, 3, 4, 5, 7, 10, 11, 20, and 25 are accepted. Accepted except for the last sentence which is rejected upon the greater weight of the credible evidence as a whole. Accepted but specifically not adopted as stated because the plan calls for destruction of certain mangroves (100- 150 ft.) and the planting of others as opposed to mere "addition." 6, 9, 12, and 27 are accepted in part and rejected in part. There was a failure of proof by both parties as to whether the Petitioner would or would not be conducting all activities landward of those lands conveyed. Although there is testimony to this effect, none of the surveys introduced nor other competent evidence allow the undersigned to definitely plot the description contained in Exhibit P-9 with respect to the current permit application plans. In any case, the proposals are not dispositive of the material issues in this case. The reservation, if it does apply, supports denial of the permit. See FOF 9. 8, 26, 28, 29, and 32 are rejected as subordinate and unnecessary, and in some cases as mere recitation of testimony or unproved. See next ruling. 13, 14, 15, 16, 17, 18, 19, 21, 22, 30, 31 and 33. Portions of these proposals are accepted in substance as reflected in the FOF. In part, they are rejected as mere recitation of testimony or as subordinate and unnecessary. The remainder is not accepted due to the relative weight of the credible testimony which is reflected in the facts as found. 34-36. Rejected for the reasons set out in FOF 13. Respondent's PFOF 1, 2, 4-6, 9, 11, 14-22, 24-34, 38-43, 48-52, 54, sentence 2 of 57, all except sentence 1 of 59, and 60 are accepted but not necessarily adopted in the interest of space and clarity or because they are cumulative or mere recitations of testimony. 3. Rejected for the reasons set out in FOF 16. Rejected. There was a failure of proof by both parties as to whether the Petitioner would or would not be conducting all activities landward of those lands conveyed. In any case, the proposal is immaterial to the environmental issues dispositive in this case. See FOF 9 and ruling on Petitioner's 6, 9, 12 and 27. Rejected as this was the unproven opinion of Mr. Poppel. No consent judgment is in evidence. 10, 12, and 13. Portions of these proposals are accepted in substance as reflected in the FOF. In part, they are rejected as mere recitation of testimony or as subordinate and unnecessary. The remainder is not accepted due to the relative weight of the credible testimony as reflected as the facts as found. 23, 53, sentence one of 57, and sentence one of 59, are rejected as argument of counsel or statement of position. 35-37, 44-47, 55, 56, 58, and 61-64 are rejected as subordinate, unnecessary or cumulative to the facts as found. COPIES FURNISHED: Dale Twachtmann, Secretary Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Robert A. Routa, Esquire Post Office Drawer 6506 Tallahassee, Florida 32314-6506 Richard Grosso, Esquire Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32399-2400

Florida Laws (2) 120.57267.061
# 1
SOUTH FLORIDA WATER MANAGEMENT DISTRICT vs JESUS G. QUEVEDO, 98-003053 (1998)
Division of Administrative Hearings, Florida Filed:West Palm Beach, Florida Jul. 15, 1998 Number: 98-003053 Latest Update: May 17, 1999

The Issue The issue for determination is whether Petitioner's revocation of Respondent's modified permit, authorizing a cross- fence on Petitioner's fee owned right-of-way, should be approved.

Findings Of Fact The South Florida Water Management District (District) is a public corporation in the State of Florida, existing by virtue of Chapter 25270, Laws of Florida (1949), and operating pursuant to Chapter 373, Florida Statutes, and Title 40E, Florida Administrative Code, as a multi-purpose water management district. The District's principal office is West Palm Beach, Florida. In executing its multi-purpose, the District, as local sponsor for the US Army Corps of Engineers' Central and Southern Florida Flood Control Project, acquired canal rights-of-way. The District's rights-of-way were acquired to enable the Corps of Engineers to construct the flood control project and to maintain the system after its construction. The District operates a proprietary-based right-of-way program to manage the various property interests of the canal rights-of-way. The purpose of the District's right-of-way program is, to the extent possible, to allow uses of the rights- of-way that do not conflict with the flood control project. The rights-of way are used by both public and private concerns, including adjacent property owners, governmental entities, and utility companies. Jesus G. Quevedo is a private individual. His address is 2615 North Federal Highway, Lake Worth, Florida. The property at this address was vacant when Mr. Quevedo purchased it, and he has owned the property for approximately ten (10) years. The District has fee simple title to a strip of land on the south side of the District's C-51 Canal, immediately west of the Federal Highway/Olive Avenue bridge (C-51 Right-of-Way). Mr. Quevedo's property is located at the side of and adjacent to the C-51 Right-of-Way. The C-51 Right-of-Way is also located within the boundaries of Spillway Park as established in the agreement between the District and the City of Lake Worth. Generally described, Spillway Park includes the District's fee simple owned right-of-way on the south side of the District's C-51 Canal, beginning at the west side of the Federal Highway/Olive Avenue bridge and continuing to the east side of the Dixie Highway bridge. Mr. Quevedo has no real property interest in the C-51 Right-of-Way. Prior to purchasing his property, Mr. Quevedo was aware that the District owned the C-51 Right-of-Way. Historically, portions of Spillway Park and the C-51 Right-of-Way, in particular, have been a unique and popular location for excellent snook fishing by the public. These areas continue to be considered as such. On February 11, 1993, Mr. Quevedo was issued SFWMD Permit No. 9801 (Permit), a right-of-way occupancy permit, by the District’s Governing Board. The Permit authorized him to make use of the District’s lands and works as follows: 20’ X 50’ BOAT DOCK WITH WALKWAY, BURIED WATER AND ELECTRICAL SERVICE, POP-UP SPRINKLERS, AND SODDING WITHIN THE SOUTH RIGHT OF WAY OF C-51 LOCATED IMMEDIATELY WEST OF THE OLIVE AVENUE/FEDERAL HIGHWAY BRIDGE. During the permit application process, but prior to the issuance of the Permit, Mr. Quevedo had discussed with the District's staff the erection of a cross-fence based on allegations of improper or criminal activities by members of the public. Subsequently, in November 1995, Mr. Quevedo again discussed with the District's staff erection of a cross-fence based on the same allegations but he also included a new allegation of public safety as to the C-51 seawall. Based on the concern for public safety, the District's staff recommended that Mr. Quevedo be granted a modification to the Permit for a cross-fence. On November 14, 1996, the District's Governing Board approved, as part of its consent agenda, and issued SFWMD Permit MOD No. 9801 (MOD Permit)3 authorizing the following: CHAIN LINK CROSS FENCE WITH 16’ VEHICULAR GATE ALONG THE WEST PROPERTY LINE WITHIN THE SOUTH RIGHT OF WAY OF C-51 LOCATED AT 2615 NORTH FEDERAL HIGHWAY. The MOD Permit, as did the Permit, provides in pertinent part on its face the following: The permittee, by acceptance of this permit, hereby agrees that he shall promptly comply with all orders of the District and shall alter, repair or remove his use solely at his expense in a timely fashion. . . . This permit is issued by the District as a license to use or occupy District works or lands. . . By acceptance of this permit, the permittee expressly acknowledges that the permittee bears all risk of loss as a result of revocation of this permit. The MOD Permit, as did the Permit, contained standard limiting conditions, as provided in Rule 40E-6.381, Florida Administrative Code, and special conditions. The limiting conditions provide in pertinent part as follows: Permittee agrees to abide by all of the terms and conditions of this permit, including any representations made on the permit application and related documents. . . . This permit does not create any vested rights, and except for governmental entities and public or private utilities, is revocable at will upon reasonable prior written notice. Permittee bears all risk of loss as to monies expended in furtherance of the permitted use. Upon revocation, the permittee shall promptly modify, relocate or remove the permitted use. In the event of failure to so comply within the specified time, the District may remove the permitted use and permittee shall be responsible for all removal costs. This permit does not convey any property rights nor any rights or privileges other than those specified herein. . . . Having been granted the MOD Permit, Mr. Quevedo erected the cross-fence within and onto the C-51 Right-of-Way. The C-51 Right-of-Way is located adjacent to Mr. Quevedo’s property, as indicated earlier, and continues westerly to the permitted cross-fence. The C-51 Right-of-Way is enclosed by the cross-fence, preventing access by the public, and is located easterly of the cross-fence. As the C-51 Right-of-Way is located within the boundaries of the Spillway Park, the cross- fence is also located within the boundaries of the Spillway Park. During the time that Mr. Quevedo has owned his home, including prior to and after erection of the cross-fence, he, his family members and/or guests have frequently fished from the C-51 seawall and used the C-51 Right-of-Way enclosed by the cross- fence. Prior to and after the erection of the cross-fence, Mr. Quevedo and his family members have selectively controlled access by the public to the C-51 Right-of-Way at the C-51 seawall. Prior to the erection of the cross-fence, Mr. Quevedo chased members of the public off the C-51 Right-of-Way. Mr. Quevedo and members of his family also called law enforcement officers to remove members of the public who were located on the C-51 Right-of-Way, even if the members of the public were fishing from the C-51 seawall. After the erection of the cross-fence, Mr. Quevedo and his family members continued to engage in this conduct of selective access. Subsequent to the erection of the cross-fence, Mr. Quevedo had a member of the public arrested for trespassing. The person allegedly jumped over or went around the cross-fence to fish from the C-51 seawall in the C-51 Right-of-Way. With the existence of the cross-fence, Mr. Quevedo has prevented the general public from using the C-51 Right-of-Way, including the C-51 seawall. As a result, he has acquired the exclusive, private use of the C-51 Right-of-Way at the C-51 seawall, which is publicly owned land, and has, almost doubled the size of his adjacent property without the obligations and expense of acquisition, assuming he could acquire the property through acquisition. The District's policy is that public land should be open to the public. Contrary to this policy, Mr. Quevedo's cross-fence precludes access to the District's right-of-way (C-51 Right-of-Way), including the seawall, for passive recreational use. Similar cross-fencing, although not within the boundaries of Spillway Park, have been erected behind residences on the northeast, northwest, and southeast sides of Federal Highway, along the District’s C-51 Canal bank. The cross-fencing prevents public use of the District’s C-51 Canal bank at these locations. The City of Lake Worth made improvements within the boundaries of Spillway Park; however, it made no improvements, and does not intend to make any improvements in the future, at the C-51 Right-of-Way where Mr. Quevedo’s cross-fence is located or at the other private lots west of Mr. Quevedo's property. All of the improvements made at Mr. Quevedo’s cross-fence at the C-51 Right-of-Way have been made by him even though the C-51 Right-of- Way is located within Spillway Park. The original public safety rationale for authorizing Mr. Quevedo to erect the cross-fence blocking public access was revisited by the District. Additional investigation by safety experts (Risk Management staff) revealed that no unreasonable danger existed by allowing public access to the C-51 seawall at the C-51 Right-of-Way. In the absence of the public safety basis for closure of the C-51 Right-of-Way, such closure was contrary to District policy. As a consequence, the District’s staff recommended to the District’s Governing Board that the MOD Permit, authorizing Mr. Quevedo’s cross-fence, be revoked. After conducting two public meetings and receiving comments from Mr. Quevedo, members of the public, and the District’s staff as to the policy issue of pubic access to the C- 51 Right-of-Way, the District’s Governing Board determined that the C-51 Right-of-Way should be open to the public. Consequently, the Governing Board decided to revoke Mr. Quevedo's MOD Permit. Allegations of criminal activity within the general boundaries of Spillway Park and, specifically, in the C-51 Right- of-Way at the cross-fence area, were made by Mr. Quevedo as a basis to not revoke the MOD Permit and allow the cross-fence to remain. Such allegations have no bearing on the revocation of the MOD Permit.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the South Florida Water Management District enter a final order revoking SFWMD Permit No. MOD 981 issued to Jesus G. Quevedo. DONE AND ENTERED this 8th day of March, 1999, in Tallahassee, Leon County, Florida. ERROL H. POWELL Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 8th day of March, 1999.

Florida Laws (6) 120.52120.569120.57373.016373.085373.086 Florida Administrative Code (3) 40E-6.01140E-6.34140E-6.381
# 2
MICHAEL L. GUTTMANN vs ADR OF PENSACOLA AND DEPARTMENT OF ENVIRONMENTAL PROTECTION, 00-002524 (2000)
Division of Administrative Hearings, Florida Filed:Pensacola, Florida Jun. 16, 2000 Number: 00-002524 Latest Update: Mar. 18, 2002

The Issue The issue is whether ADR of Pensacola should be issued a wetland resource permit and sovereign submerged lands authorization allowing the construction of a 30-slip docking facility on Big Lagoon, Escambia County, Florida.

Findings Of Fact Based upon all of the evidence, the following findings of fact are determined: Background In this environmental permitting dispute, Petitioner, Michael L. Guttmann, who lives less than one mile from the project site, has challenged the proposed issuance by Respondent, Department of Environmental Protection (Department), of a Wetland Resource Permit (permit) and Sovereign Submerged Lands Authorization (authorization) which would allow Respondent, ADR of Pensacola (applicant), to construct a 30-slip docking facility on Big Lagoon, Escambia County, Florida. The facility will be part of a condominium project to be constructed on the upland portion of the property. As grounds for contesting the permit, Petitioner contended that the Department failed to consider "the long term health of Big Lagoon," navigational hazards created by the project, or public safety; failed to impose an adequate "monitoring program"; did not provide for a "contingency plan for hurricane activity"; failed to consider that the activity will degrade a nearby Outstanding Florida Water [OFW]; and failed to take into account "existing unused marina slips close by." The petition further alleged that the foregoing concerns constituted violations of Section 373.414, Florida Statutes (2000), and Rules 62-4.242, 62-302.300, 62-302.700, and 62- 312.080, Florida Administrative Code. The cited statute identifies "additional criteria" for issuing a permit while the first three rules pertain to OFWs. The last rule contains general standards for the issuance or denial of a permit. Petitioner raised no issues concerning the issuance of the authorization in his initial pleading. Until April 2000, the upland property was owned by the applicant. It was then sold to Harbour Pointe of Pensacola, Inc., which has subsequently entered into an agreement with the applicant allowing the applicant to construct the dock, operate the permit, and purchase a condominium unit. If the application is approved, applicant intends to construct a 442 feet x 4 feet access pier with seventeen 30 feet x 1.5 feet finger piers, thirteen 40 feet x 1.5 feet finger piers, and a 74 feet x 1.5 feet terminal platform, to form a 30-slip docking facility at 10901 Gulf Beach Highway on Big Lagoon, a Class III water in Escambia County, Florida. Approval to use the submerged lands is found in the authorization. The dock will be located in a "fairly pristine area" in Big Lagoon a few miles southwest of Pensacola, Florida. That body of water is six miles in length and is separated from the Gulf of Mexico by a slender coastal barrier island known as Perdido Key, which lies approximately one statute mile south of the project. Continuing west along the shoreline next to the project site are a string of single-family homes with small dock facilities, most of which are less than 1,000 square feet in size and thus exempt from Department permitting requirements. To the east of the undeveloped property are more undeveloped lots and a private yacht club with extensive docking facilities. The facility being challenged here will not be a public marina; rather, it will serve the residents of a proposed upland condominium (consisting of two buildings) to be constructed at the same location. The project is more commonly referred to as the Harbour Pointe Marina. It is fair to infer that Petitioner and adjoining property owners object not only to the dock, but also to the condominium project. The application and project When the application was originally filed with the Department in July 1995, it contained plans for a longer dock and more slips. Due to a reduction in the length of the pier and number of slips to conform to Department rules, other technical changes, and various requests by the Department for additional information, the draft permit was not issued by the Department until May 2000. The Department considers this a "major project" with "major [hydrographic and water quality] issues connected with it." In reviewing the application, the Department considered whether reasonable assurance had been given by the applicant that water quality standards would not be violated, and whether the additional criteria in Section 373.414(1)(a)1.-7., Florida Statutes (2000), had been satisfied. The Department concluded that water quality standards would not be degraded, and that the project, as designed and permitted, was not contrary to the public interest. In making the public interest determination, the Department typically assigns a plus, minus, or neutral score to each of the seven statutory factors. In this case, a neutral score was given to historical and archaeological resources [paragraph 373.414(1)(a)6.] since there were none, while the permanent nature of the project [paragraph 373.414(1)(a)5.] caused it to be rated "a little bit on the minus side"; all other factors were given a plus. Department witness Athnos then concluded that on balance the project "was a plus because it will not adversely affect any of these things." The access pier (dock) runs perpendicular from the shoreline and stretches out some 442 feet to where the water reaches a depth of seventeen feet, which is the deepest point in Big Lagoon. The unusual length of the dock is required so that the boat slips will begin past the seagrass colony (which lies closer to the shore), to prevent boat propeller blades from cutting the top of the seagrass, and to reduce the amount of sedimentation stirred up by the boat propellers. Aerial photographs confirm that when completed, the dock will probably be the largest in Big Lagoon, and much larger than the neighboring docks to the west. The use of boat slips will be limited to condominium owners. Only 19 slips will be constructed initially, since the applicant has secured approval at this time for only the first phase of the condominium project. When approval for the second phase is secured, the applicant intends to add an additional 11 slips. Water quality In his initial pleading, Petitioner made a general allegation that the Department failed to consider "the long term health of Big Lagoon"; there were no specific allegations regarding water quality standards. In his Proposed Recommended Order, however, he argues that the [a]pplicant failed to provide reasonable assurances that water quality standards would not be violated." Assuming arguendo that the issue has been properly raised, Petitioner has still failed to substantiate his allegation. That portion of Big Lagoon where the project will be located is a Class III water of the State. Studies on metals, greases, oils, and the like submitted by the applicant reflected that the "water quality [in that area] did not exceed the standards in Rule 62-302." To provide further reasonable assurance regarding water quality standards, the applicant has voluntarily agreed to use concrete piling and aluminum docks. Unlike wooden piling and docks, these types of materials do not leach toxic substances such as arsenic, copper, and acromiom into the water. In addition, special permit conditions require that sewage pumpout equipment be located at the site so that boats will not discharge raw sewage into the waters. Liveaboards are prohibited, and fueling will not be available at the facility. Finally, the cleaning of fish is not allowed, and boat owners cannot scrape their boat bottoms while docked at the facility. All of these conditions are designed to ensure that water quality standards will not be violated. Enforcement mechanisms for the above conditions are found in either the permit itself or Chapter 403, Florida Statutes. Also, one of the conditions in the draft permit expressly states that the applicant is not relieved of liability for harm or injury to humans, plants, or property caused by the construction of the dock. However, if a permit is issued, Condition 9 of the permit should be modified to require that trained personnel be available twenty-four hours per day, rather than just during standard business hours, to assist boaters with, and ensure that they use, the sewage pumpout equipment. Any permit issued should also require that boats be placed on lifts while using the docking facilities. This will prevent any leaching of paint from the boat bottoms into the waters. Otherwise, the paint would cause a degradation of the water. The more persuasive evidence supports a finding that, with the additional conditions, reasonable assurance has been given that the state water quality standards applicable to Class III waters will not be violated. Outstanding Florida Waters In his complaint, Petitioner has contended that "the proposed activity will degrade an [OFW] as a result of its close proximity to the Gulf Islands National Seashore," and that the"[D]epartment has made no analysis of this project['s] impact on the [OFW] which is adjacent to the proposed activity." The record discloses that the southern portion of Big Lagoon has been designated as an OFW. This area includes the waters around Gulf Islands National Seashore and Big Lagoon State Park; they begin approximately 650 to 700 feet south of the end of the dock. As noted earlier, the project is located within Class III waters. Because the Department found that no violation of state water quality standards in those waters would occur, it likewise concluded, properly in this case, that the project would have no impact on any OFW, even though such waters begin some 650 or 700 feet away. Under these circumstances, there would be no reason to assess the water quality in the OFWs or the projected impacts on those waters, as Petitioner suggests. In the absence of any credible evidence to the contrary, it is found that the project will not adversely impact an OFW. Hydrographic characteristics If a dock has more than ten boat slips, the Department routinely conducts a hydrographic (flushing) study to determine whether the structure will adversely affect the flow of the water in the area or cause erosion or shoaling on adjacent properties. In the summer of 1999, a Department engineer conducted a hydrographic study using a dye tracer and concluded that flushing characteristics were excellent and that there would be no adverse effects caused by the project. This conclusion has not been credibly contradicted. Therefore, it is found that the dock will not adversely affect the flow of water or cause harmful erosion or shoaling. Navigational issues In his initial pleading, Petitioner raised a contention that the project will create "navigational hazards" because the dock "extends nearly into a navigation channel which routinely carries commercial towboats transporting hazardous material, the spill of which would adversely affect Big Lagoon." He also alleges that the rupture of a vessel could impact public safety. Channel markers placed by the U.S. Army Corps of Engineers in the Intracoastal Waterway (of which Big Lagoon is a part) define a navigational channel for boats approximately 400- 500 feet south of the end of the proposed dock. That channel is used by both recreational and commercial traffic, including barges and other large watercraft which regularly haul oil, chemicals, and other products through the Intracoastal Waterway to and from Pensacola, Panama City, and St. Marks, Florida. The water in the marked channel is only thirteen feet deep. Because the U.S. Army Corps of Engineers has jurisdiction over the maintenance of the marked channel, the Department defers to that entity's judgment in determining whether a proposed structure will impede navigation in the marked channel. The proposed dock ends near the deepest part of the natural channel where the water reaches a depth of seventeen feet. Because of the deeper water to the north, which allows the boat captain to "get better steerage," the commercial boat traffic sometimes tends to follow the natural channel, rather than the marked channel formed by the navigational aids. When they do so, however, they are straying from the so-called "legal" channel. Petitioner's expert, a retired tugboat captain, opined that in a storm or squall, a commercial boat using the natural rather than the marked navigational channel might be blown extremely close to the dock or even strike it, thus causing a hazardous situation. He acknowledged, however, that he was not predicting more accidents because of the construction of the dock; he also admitted that the dock would not cause ships to "sudden[ly] have problems navigating that Big Lagoon." The location of the proposed dock was shown to the U.S. Army Corps of Engineers and the Florida Marine Patrol, and there were no adverse comments regarding this issue by either agency. In the absence of any negative comments by those agencies, and the acknowledgement by Petitioner's own witness that the dock will not cause accidents or create navigational problems for other boaters, the more persuasive evidence supports a finding that the project will not adversely affect navigation or public safety in Big Lagoon. Seagrass and monitoring Petitioner has alleged that Big Lagoon "is the healthiest body of water in Escambia County with a white sand bottom and abundant seagrass," and that the proposed project will adversely affect its "long term health." He also alleges that the Department has failed to provide a "remedy or punishment should the results [of the Department's monitoring plan] indicate that the seagrass has been harmed"; that the Department's monitoring plan is not "of sufficient duration to reasonably report the long-term effect of concentrated mooring and traffic" or "sufficiently specific to insure usable data"; and that the data relied upon by the Department [such as photographs] were not "sufficient" to determine the existing health of the seagrass. The evidence reflects that a "nice, healthy seagrass community" is found in the area where the dock will be constructed. It stretches out several hundred feet from the shoreline to where the water reaches a depth of around six feet. The Department considers seagrass to be a "most important resource" which should be protected. This is because seagrass is essential for "binding" the shoreline and stabilizing the sediments, and it serves as a nursery area for juvenile fish and shellfish. Indeed, due to these beneficial effects, far more species of shellfish are found in areas where seagrass thrives than in areas where no seagrass exists. To protect the seagrass, the dock has been extended out 442 feet from the shoreline so that the first boat slip begins at a depth of seven feet, or just past where the seagrass ends. This will prevent the scarring of the grass by boat propellers and reduce turbidity that is typically caused by propeller dredging and boat wakes. Thus, at least theoretically, no boat activity by condominium owners is contemplated in waters of less than seven feet. Because seagrass requires as much light as possible to survive, educational signs will be posted in the area to warn boaters that seagrass is found closer to the shoreline, and that mooring in that area is prohibited. There is, however, no enforcement mechanism to ensure that condominium owners or nonresidents comply with these warnings. Under the draft permit, the Department is allowed to access the premises at reasonable times for sampling or monitoring purposes. A special section of the draft permit includes a number of requirements pertaining to the monitoring of turbidity levels during dock construction while another section requires the applicant to take photographs of the existing seagrass beds at numerous locations before, during, and after construction of the dock. Condition 14 requires that the permittee maintain "records of monitoring information" for at least three years. The evidence supports a finding that if a permit is issued, a mapping of the seagrass should be made prior to construction of the dock and during the height of the growing season (September and October). When the photographing of the area is performed, the applicant should use a sampling protocol that is based on a scientifically determined method. Also, both affected and unaffected areas should be monitored to compare the effect of the additional boat traffic on the seagrass after the dock is constructed. All of these conditions should be incorporated into any issued permit. According to Dr. Heck, a marine biologist who specializes in the study of seagrass and testified as an expert on behalf of Petitioner, seagrass beds in Big Lagoon have been "shallowing up" or thinning out in recent years due to decreasing water clarity. In other words, as the water becomes cloudier from more and more boat activity, the sunlight cannot penetrate and the seagrass will not thrive. The seagrasses most susceptible to disappearing are those that are found at the deepest depth. Doctor Heck attributed the decline in seagrass to increased human activity in the area. This activity is related not only to the existing homeowners in the area, but also to the non-resident boaters (both recreational and commercial) who use the waters in that area. A Department study conducted in 1995 confirmed that the only seagrass area in North Florida "significantly affected" by propeller scarring was an area in Big Lagoon known as Scallop Cove, near Spanish Point. This study is consistent with those studies performed by Dr. Heck in the late 1990's, and one as recently as last year, that support a finding that seagrass in Big Lagoon is on the decline due to both propeller scarring and increased turbidity caused by wakes from larger recreational boats. For this reason, Dr. Heck concluded that the addition of thirty boats at the project site, some of which would be as large as 30 feet or so, would have a "negative effect" on the seagrass colony. This in turn will cause a negative effect on the marine productivity in the area, as well as the conservation of fish and their habitat. Doctor Heck's testimony on this issue is found to be the most persuasive. Other concerns Petitioner further contends that the Department failed to provide a "meaningful contingency plan for hurricane activity." This matter, however, is beyond the permitting jurisdiction of the Department. Petitioner has also contended that the Department failed to take into account "existing unused marina slips close by" which could be used by the condominium owners. Like the prior issue, this matter is not a consideration in the permitting scheme. Another issue raised by Petitioner, albeit untimely, was that the construction of this dock could lead to further development in Big Lagoon. There was, however, no evidentiary support for this contention. Indeed, there is no evidence that future permit applications with impacts similar to this application can reasonably be expected in the area. At hearing, Petitioner raised for the first time a contention that the applicant no longer owns the upland property and thus a permit/authorization cannot be issued to that entity. Aside from this issue being untimely, the fact that a permit holder does not own the upland property is not unusual. If this occurs, permits and authorizations (leases) are routinely transferred to the new owner once the Department receives the necessary title information. It is not a ground to defeat the application. Petitioner also raised for the first time at hearing a contention that the site plan approval for the condominium has expired under a provision of the Escambia County Land Development Code and therefore the permit should be denied. Again, the issue is untimely; more importantly, it should be addressed in another forum since the Department has no jurisdiction over this issue. Likewise, a legitimate concern by an adjoining property owner, witness Hobgood, and an area realtor, that Hobgood's single-family property would probably decline in value if the project is built is nonetheless beyond the Department's jurisdiction. Finally, a contention that the Department improperly calculated the maximum number of boat slips for an 88-unit condominium project has been rejected. The record contains a lengthy explanation by witness Athnos which shows that the Department's calculation under Rule 18-21.004(4)1., Florida Administrative Code, was correct. Those calculations are also detailed in Respondents' Exhibit 14.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that the Department of Environmental Protection enter a final order denying the application of ADR of Pensacola for a wetland resource permit and sovereign submerged lands authorization. DONE AND ENTERED this 28th day of February, 2001, in Tallahassee, Leon County, Florida. DONALD R. ALEXANDER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (850) 488-9675, SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 28th day of February, 2001. COPIES FURNISHED: Kathy C. Carter, Agency Clerk Department of Environmental Protection 3900 Commonwealth Boulevard Mail Station 35 Tallahassee, Florida 32399-3000 Michael L. Guttmann, Esquire 314 South Baylen Street, Suite 201 Pensacola, Florida 32501-5949 Charles T. Collette, Esquire Department of Environmental Protection 3900 Commonwealth Boulevard Mail Station 35 Tallahassee, Florida 32399-3000 David A. Sapp, Esquire 1017 North 12th Avenue Pensacola, Florida 32501-3306 Teri L. Donaldson, General Counsel Department of Environmental Protection 3900 Commonwealth Boulevard Mail Station 35 Tallahassee, Florida 32399-3000

Florida Laws (5) 120.569120.57253.77267.061373.414 Florida Administrative Code (6) 18-21.00428-106.20562-302.70062-312.06562-312.08062-4.242
# 3
COCA COLA COMPANY vs. SOUTHWEST FLORIDA REGIONAL PLANNING COUNCIL, 76-001736 (1976)
Division of Administrative Hearings, Florida Number: 76-001736 Latest Update: Jun. 15, 1977

Findings Of Fact Application No. 76-00493 is for an existing consumptive use permit for five wells located in the Peace River Basin, Polk County on 608.6 acres. The permit seeks a total average annual withdrawal of 7.2 million gallons per day and a maximum daily withdrawal of 14.97 million gallons per day. Ninety-five percent of the water withdrawal will be used for industrial purposes and five percent will be used for irrigation. The Southwest Florida Water Management District's staff recommends issuance of the permit with the following conditions: That the applicant shall install totalizing flow meters of the propeller-driven type on all withdrawal points covered by the application except that well located at Latitude 28 degrees 03' 13", Longitude 81 degrees 47' 54". That the applicant shall record the pumpage from the above meters on a weekly basis and submit a record of that pumpage quarterly to the district beginning January 15, 1977. That the permit shall expire on December 31, 1980

Recommendation It is hereby RECOMMENDED that a consumptive use permit be granted in the amounts applied for in Application No. 76-00493 subject to the conditions set forth in paragraph 2 above. ENTERED this 13th day of October, 1976, in Tallahassee, Florida. CHRIS H. BENTLEY Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 COPIES FURNISHED: Jay T. Ahern, Esquire Southwest Florida Water Management District Post Office Box 457 Brooksville, Florida 33512 Coca Cola Company Post Office Box 247 Auburndale, Florida 33823

# 4
STANDARD SAND AND SILICA COMPANY vs. SOUTHWEST FLORIDA REGIONAL PLANNING COUNCIL, 75-002154 (1975)
Division of Administrative Hearings, Florida Number: 75-002154 Latest Update: Mar. 21, 1977

Findings Of Fact Application No. 75-00196 is a request by the Standard Sand and Silica Company, for a consumptive water use permit. This application is for an existing use involving withdrawal from one well. The application seeks an average daily withdrawal of 1.6925 million gallons per day and a maximum daily withdrawal of 2.16 million gallons per day. The sought-for withdrawal will not exceed the water crop as defined by the district, with the withdrawal consumptively using only 35 percent of the water crop. The water will be used on site for the washing of sand. Mr. Clifton W. Golden is an adjacent landowner who testified that he was afraid of salt water intrusion and that a sink hole might develop because of the vast quantities of water taken from the aquifer by the applicant. He does not feel that the issuance of a permit would be consistent with the public interest. He presented no hydrological data showing that issuance of the permit would adversely affect his property. Mary Fausteen Thompson is a property owner adjacent to the site from which the water will be taken. She has had problems in the past with Standard Sand and Silica Company apparently discharging excess water on to her property. She thinks those problems may be occurring again, causing some of her property to be flooded. The sought-for consumptive use will not significantly induce salt water intrusion. Except as otherwise noted in the findings of fact, none of the conditions set forth in Subsection 16J-2.11(2), (3) or (4), F.A.C., will be violated. Several letters of objections have been received in addition to the objectors noted above. The Southwest Florida Water Management District's staff recommends issuance of the subject permit in the amounts requested with the following conditions: That no off-site runoff be permitted by the applicant. That flowmeters be placed on the well and quarterly reports made to the district.

Recommendation It is hereby RECOMMENDED that Application No. 75-00196 be granted with the conditions set forth in paragraph 7 above. ENTERED this 28th day of May, 1976, in Tallahassee, Florida. CHRIS H. BENTLEY, Hearing Officer Division of Administrative Hearings Room 530, Carlton Building Tallahassee, Florida 32304 (904) 488-9675 COPIES FURNISHED: Jay T. Ahern, Esquire Southwest Florida Water Management District P.O. Box 457 Brooksville, Florida 33512 Eugene W. Harris Standard Sand and Silica Co. P.O. Box 35 Davenport, Florida 33837 Mrs. Mary Fausteen Thompson Box 82-C, Evans Road Polk City, Florida Mr. Clifton W. Golden 800 Oriole Drive Virginia Beach, Florida 23451 Mr. John C. Jones Executive Director Florida Wildlife Federation 4080 North Haverhill Road West Palm Beach, Florida 33407

Florida Laws (2) 373.019373.226
# 6
ALAN S. DORRILL vs ROBERT LAVEN, JOHN CLOUD, AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 91-003988 (1991)
Division of Administrative Hearings, Florida Filed:Sarasota, Florida Jun. 25, 1991 Number: 91-003988 Latest Update: Dec. 16, 1991

Findings Of Fact Upon consideration of the oral and documentary evidence adduced at the hearing, the following relevant findings of fact are made: Respondent Laven owns a parcel of land at 1500 Bay View Drive, Sarasota, Florida on which he has a home. The property is approximately 180 feet by 100 feet, and is located on Sarasota Bay. A seawall has been constructed along the shoreline. Respondent Cloud owns a parcel of land at 2610 Cardinal Lane, Sarasota, Florida that is contiguous to Respondent Laven's property at 1500 Bay View Drive, Sarasota, Florida that is also located on Sarasota Bay. Approximately 100 feet of the property is located along the shoreline of Sarasota Bay. Sarasota Bay is currently designated as a Class III outstanding Florida waterbody. On or about June 28, 1991 Respondents Laven/Cloud filed an application to modify existing permit number 581885033 which had been previously issued to Respondent Laven for construction of a private dock consisting of an access pier 210 feet by 5 feet, with a terminal platform 20 feet by 4 feet on Laven's property located at 1500 Bay View Drive, Sarasota, Florida. Previous to the modified application being filed by Laven and Cloud, Laven had attempted to modify permit no. 581885033 by reducing the access pier from 210 feet by 5 feet to 175 feet by 5 feet. The Department concluded that the dock, as modified, would not reach water of sufficient depth to prevent damage to the seagrass, and considered this a major modification requiring a new application. Therefore, the Department denied the modified application, and Respondent Laven did not file a new application. The application filed by Laven/Cloud on or about June 28, 1991 to modify existing permit 581885033 proposed to construct a private dock on the property line between Laven's and Cloud's property. The private dock was proposed to consist of an access pier 4 feet by 210 feet, with two terminal platforms, each 25 feet by 6 feet. After review of the application to modify permit 58188503 the Department issued a Notice of Intent to issue a permit for the proposed construction of the private dock on August 2, 1991. The Notice of Intent included 18 specific conditions to which the proposed dock would be subject. Those relevant to this proceeding are as follows: 1) . . . . If historical or archaeological artifacts, such as Indian canoes, are discovered at any time within the project site the permittee shall immediately notify the district office and the Bureau of Historic Preservation, Division of Archives, History and Records Management, R.A. Gray Building, Tallahassee, Florida 32301. Turbidity screens shall be utilized, secured, and properly maintained during the permitted construction and shall remain in place until any generated turbidity subsides. Double turbidity screens, staked hay bales, staged construction and other additional measures shall be used as necessary to insure compliance with water quality standards in Chapter 17-3, Florida Administrative Code. During construction, all areas of exposed soils shall be effectively isolated from waters of the state to prevent erosion or deposition. All exposed soils shall be stabilized with an appropriate ground cover within 72 hours of attaining final grade. 5) . . . . 6) . . . . The applicant is not permitted to conduct or construct the following activities or facilities in conjunction with this dock structure: Fish cleaning facilities. Fuel hoses or fueling facilities. The mooring of boats or vessels for live aboards. The mooring of boats utilized for com- mercial purposes such as fishing, scuba diving, boat rental, etc. Picnic tables or benches. Storage sheds or enclosed structures. Covered boat slips. Sanitary facilities. The rental of boat slips or mooring space. Turbidity screens shall effectively encom- pass each piling during installation and remain in place until any generated turbidity has subsided. Turbidity screens shall effectively encompass an area around each piling not to exceed 7 square feet. Any watercraft which may be utilized during construction activities shall only operate/moor in waters of sufficient depth so as not to cause bottom scour or prop dredging. The access pier shall be elevated a minimum of 5 feet above mean high water for the most waterward 150 linear feet of the access pier. The most waterward 150 linear feet of the access pier shall be constructed with the slated[sic] design indicated on sheet 4 of permit submittals. The most landward 60 feet of the access pier shall be constructed utilizing the 2 x 6 decking. The permittees shall construct 100 linear feet of rip rap along the existing vertical seawall as indicated on sheet 1 of permit submittals. Rip rap material shall consist of natural boulders or clean concrete rubble six inches to three feet in diameter or in average dimensions. The slope of the rip rap shall be no steeper than 2H:1V. There shall be no reinforcing rods or other similar protrusions in concrete rubble and all rubble or boulders shall be free of attached sediments. The rip rap shall be install concurrently with the construction of the permitted dock. The permittees shall grant the Department a conservation easement over the shorelines of the two subject parcels. A conservation easement shall be established over the seawall cap and 2 feet waterward of the seawall for the entire length of the seawall to 1500 Bay View Drive (Lots 1, 2, 3, 4, 11, 12, 13, and 14 Block Q, Bay View Heights Addition). A conservation easement shall also be established between the limits of the mean high water linear and the landward extent of waters of the State (Pursuant to Section 170301.400[sic] FAC) for the entire length of the shoreline at 2610 Cardinal Place (Lots 5, 6, 7, 8, 15, 16, 17 and 18, Block Q, Bay View Heights Addition). 14) . . . . 15) . . . . The following seagrass monitoring program shall be implemented and adhered to: Within 45 days of the issuance of this permit (and prior to initiation of dock con- struction) the permittee shall establish a preconstruction monitoring program consisting of one meter square grids within the area specified on sheet 1 A of permit attachments. A minimum of 10 random one meter square plots shall be selected within each area A and B and also along the centerline established along the length of the dock. The permittee shall measure percent areal coverage of seagrasses within each plot within the grid system. Each of the plots shall be monitored as specified in above a minimum of two times per year (July and January) over a three year monitoring period subsequent to dock construction. Reports shall include date, water depth, water clarity, species of seagrasses observed, percent areal coverage and representative height of seagrasses within each plot. Moni- toring reports shall be submitted to the Department within 30 days of the monitoring event. The first monitoring event shall occur during the first January or July (which ever occurs first) subsequent to completion of dock construction. Hand railing shall be constructed along the entire length of the access pier (on both sides). The temporary or permanent mooring of watercraft shall only occur at the terminal platform. 18) . . . . By imposing special conditions 3, 4, 8 and 9 it will ensure that the dock construction will have a temporary minimal impact on the water quality, and there will be no permanent water quality impacts as a result of this project. If this permit is not issued, it would be possible for each of the applicants to build an exempt dock on his property which would require two accesses or swaths through the seagrass beds. An exempt dock (500 square feet or less) may result in the dock terminating in seagrass beds and in water of insufficient depth to prevent damage to the seagrass beds or to prevent bottom scour or propeller dredging. The project site consists of a shoreline with a shoal area where Shoal grass (Halodule wrightii) and Turtle grass (Thalassia sp.) are growing, with the Turtle grass being the predominant species to a point further waterward to where there is a significant change in the water depth. Such point being approximately at the termination of the proposed dock. Beyond this point the seagrass beds are scattered. Therefore, any dock shorter than approximately 210 feet would terminate in the main seagrass beds and result in the seagrass beds being routinely disrupted or damaged by power boats. The proposed design of the most waterward 150 linear feet of the deck portion of the proposed dock has less solid surface than a normal deck, and, along with the proposed height of the most waterward 150 linear feet of the proposed dock, would allow substantially more light to penetrate the area and provide sufficient light for healthy existence of the seagrasses. The proposed impacts consists of disturbance of the seagrass beds. Requiring railing along the entire access pier on both sides will preclude mooring of motor craft in the area of the seagrass and in water depths insufficient to prevent damage to the seagrass, and to prevent bottom souring and propeller dredging. Because of the length, height and design of the dock there would be minimal impact, if any, on the seagrass beds. The design of the dock will ensure that the project will not adversely affect the functions being performed in the area intended for the dock. The conservation easement will ensure that a feeding ground for wading birds will be maintained, and along with the dock design will minimize any impacts that the proposed dock will have on the fish and wild life habitats. The construction of the 100 linear feet of rip rap along the existing vertical seawall on Sarasota Bay along Laven's property will reduce scouring and erosion at the base of the seawall, and provide beneficial habitat which will be an improvement of the seawall alone. There may be minimal impacts on recreation in that it may impose some inconvenience for those fishing and those attempting to access the bay for sailing. There may be some minimal impact on navigation in that the proposed dock will entend out approximately 35 feet further than any other existing dock in the area but due to the shallow water in this area boats presently have to travel at a reduced rate of speed, and for this reason the proposed dock would not adversely affect navigation. However, this should be mitigated by requiring lights on the dock as a safety feature. The project will not adversely affect the fishing, or recreational values, or marine productivity in the vicinity of the project. The proposed project will not adversely affect the public health, safety, or welfare or property of others. The proposed dock will be a permanent structure, notwithstanding that regular mainentaince will be required. The Respondents Laven/Cloud have provided reasonable assurances that the proposed project will be clearly in the public interest, notwithstanding the minimal impact it may have on recreation and navigation. Particularly, when all Special Conditions are considered, specifically Special Conditions 12 and 13 pertaining to rip rap along the vertical seawall on Laven's propertry and the granting of the Conservation Easement over both Laven's and Cloud's shoreline.

Recommendation Accordingly, in view of the above Findings of Fact and Conclusions of Law, it is, therefore, recommended that the Department enter a Final Order issuing Permit Number 581885033 to Respondents Robert Laven and John Cloud as set forth in the Department's Intent To Issue dated August 2, 1991 provided that the grant of the subject permit should include the general and specific conditions in the Intent To Issue as well as the condition requiring lights on the dock for safety purposes as set forth in Finding of Fact 20 above. RECOMMENDED this 21st day of November, 1991, in Tallahassee, Florida. WILLIAM R. CAVE Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 21st day of November, 1991. APPENDIX TO RECOMMENDED ORDER, CASE NO. 91-3988 The following constitutes my specific rulings pursuant to Section 120- 59(2), Florida Statutes, on all of the Proposed Findings of Fact submitted by the parties in the case. Rulings on Proposed Findings of Fact Submitted by the Petitioner Both paragraphs regarding Respondent Cloud's testimony at the hearing go to his credibility as a witness and are not stated as a finding of fact and are therefore rejected. Paragraphs 1 and 2 regarding Rose Poynor's testimony appear to be supported by documents or testimony not received at the hearing and are therefore rejected. Paragraph 3 regarding Rose Poynor's testimony is either immaterial or irrelevant or goes to her credibility as a witness or is supported by facts not in the record. The paragraph regarding Roy R. Lewis' testimony goes to his credibility as a witness and is not a statement of fact. Paragraphs 1 and 2 regarding Robert Patten's testimony is more of a restatement of his testimony than a finding of fact. But in any event, are neither material or relevant. The next to the last paragraph is not supported by the record but see Finding of Fact 20. The last unnumbered paragraph is not supported by the record. See Finding of Fact 24. Rulings on Proposed Findings of Fact Submitted by Respondent Department of Environmental Regulation 1. Each of the following proposed findings of fact are adopted in substance as modified in the Recommended Order. The number in parenthesis is the Finding(s) of Fact which adopts the proposed findings of fact: 1 (1, 2, 3); 2 (4, 6); 3 (5); 4 (11); 5 (11); 6 (13); 7 (7, 8); 8 (7, 8); 9 (7, 8); 10 (7, 8); 11 (7); 12 (7); 13 (12, 15); 14 (7); 15 (12); 16 (7, 14); 17 (15); 18 (7, 16); 19 (17); 20 (7); 21 (7); 22 (7, 18); 23 (18); 24 (20); 25 (7, 17); 26 (23); 27 (19); 28 (21); 29 (22); 30 (7); 31 (17); 32 (7); 33 (9); 34 (9, 10); 35 (7, 8, 11, 12, 14-22); and 36 (7). Rulings on Proposed Findings of Fact Submitted by Respondents Laven and Cloud Respondents Laven and Cloud have divided their findings into two groups (1) Findings of Fact and (2) Ultimate Findings. Since the Findings of Fact are duplicative of the Ultimate Facts or are only restatements of the witnesses testimony, I will respond only to the Ultimate Facts. 1. Each of the following proposed findings of fact are adopted in substance as modified in the Recommended Order. The number in parenthesis is the Finding(s) of Fact which adopts the proposed finding of fact: 1 (1); 2 (3); 3 (2); 4 (4, 6); 5 (3); 6 (7, 12); 7 (7, 17, 18); 8 (7); 9 (7); 10 (7, 24); 11 (7, 24); 12 (22); 13 (17); 14 (is a duplication of paragraph 13); 15 (20); 16 (21) and 17 (16). COPIES FURNISHED: Alan S. Dorrill 1726 Floyd Street Sarasota, FL 34239 F. Craig Richardson, Esquire Icard, Merrill, Cullen, Timm, Furen, & Ginsbrug, P.A. 2033 Main Street, Suite 600 Sarasota, FL 34237 Carol Forthman, Esquire Maureen A. Eggert, Certified Legal Intern 2600 Blairstone Road Tallahassee, FL 32399-2400 Carol Browner, Secretary Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, FL 32399-2400 Daniel H. Thompson, General Counsel Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, FL 32399-2400

Florida Laws (1) 120.57
# 7
RICHARD SLUGGETT vs. DEPARTMENT OF ENVIRONMENTAL REGULATION AND ENVIRONMENTAL REGULATION COMMISSION, 86-001846 (1986)
Division of Administrative Hearings, Florida Number: 86-001846 Latest Update: Dec. 18, 1986

Findings Of Fact Upon consideration of my observation of the witnesses and their demeanor while testifying, documentary evidence received including the parties pre- hearing stipulation, the following relevant facts are found: Respondent DOT filed a dredge and fill permit based on its application filed with Respondent DER and proposed to upgrade a 4.9 mile segment of State Road 80 from a 2-lane roadway to a rural 4-lane divided roadway which included construction of new north and south bound bridges over a canal (designated as L- 8) and constructing a triple box culvert to replace the existing bridge over Callery Judge Canal, located from 20 mile bend to 5.5 miles west of State Road 7, Palm Beach County, Florida. (Joint Composite Exhibit 1). Respondent DER published the required notice of its intent to issue the applied for permit by DOT in the April 14, 1986 edition of the Palm Beach Post Times, a newspaper of general circulation. Petitioner is the fee simple owner of the property located to the west of Callery Judge Canal. Petitioner's property includes a drainage easement which has been given to the Seminole Water Management District and includes submerged portions of the canal. Callery Judge Canal is a water control structure. Callery Judge Canal is connected to another canal designated as C-51, which is also a water control structure. The length of Callery Judge from the C-51 Canal extends approximately 400 feet. There are water control structures at the end of Callery Judge Canal and approximately 4 miles both east and west of the C-51 Canal. As such, there is limited navigability of the C-51 Canal by Petitioner. The C-51 Canal is used by Petitioner and unidentified public members for recreational navigation purposes. There is no commerce navigation on either the C-51 or Callery Judge Canal. Petitioner currently has navigational access to C-51 through Callery Judge. Petitioner owns two boats which he has from time to time used on the Callery Judge Canal to get to the C-51 Canal. Both C-51 and Callery Judge Canal are Class 3 water bodies. Respondent DER has dredge and fill jurisdiction over both canals as they connect to state waters. Respondent DOT, in addition to publishing notice in the Palm Beach Post Times, sent written notice to adjacent property owners advising them of DOT's application and only Petitioner protested based on his claim of impaired navigation from Callery Judge to C-51. Additionally, Petitioner objected on the basis that the project would adversely affect his riparian rights of access to C-51 and that the effect of issuing of the requested permits would amount to the taking of private property without first making payment of full compensation to him. The existing bridge which expands Callery Judge Canal does not meet state safety practices inasmuch as there is only the approximately 2 feet between the edge of the travel lane to the face of the railing. This space provides only a 2 foot recovery lane for disabled vehicles. With the triple box culverts as applied for by DOT, an adequate recovery lane of approximately 10 feet will be provided which meets state safety requirements for recovery lanes. (Testimony of Midgett). The triple box culverts will allow for DOT to complete its planned widening of the bridge on both ends and thereby eliminate adverse safety concerns relating to traffic "bottle necking." Fish, alligators, and other wildlife will be able to continue passing from Callery Judge to C-51 after installation of the triple box culverts as proposed by DOT and therefore there will be no adverse impacts on fish and wildlife conservation. The proposed culverts will allow drainage to continue and water flow will not be constricted. Following construction of the triple box culverts, Petitioner may continue to enjoy other riparian rights that he presently enjoys. Thus, Petitioner may continue to swim and bathe in Callery Judge Canal. Petitioner may also continue to navigate Callery Judge for fishing and other recreational purposes. There are no marinas, boat lifts, boat ramps or other facilities on C- 51 or Callery Judge Canals which would provide navigation access to the canals by the general public. The one boat facility in either canal is a boat ramp in C-51 maintained by the South Florida Water Management District. The Palm Beach County Health Department, a local approved DER program, (pursuant to Section 403.916, Florida Statutes), reviewed the subject application and determined that DOT's application, with modifications incorporated in Respondent DER's intent to issue, provided the reasonable assurances and was in the public interest pursuant to Section 403.918(2), Florida Statutes. Petitioner's riparian rights to navigate Callery Judge Canal and access to C-51 would be impaired by the Respondent DOT's installation of the triple box culverts as applied for. However, when these adverse impacts are balanced against the other factors as required pursuant to Section 403.918(2), Florida Statutes, Petitioner's adverse impacts are considered to be negligible. Respondent DOT has provided Respondent DER reasonable assurances that water quality standards will not be violated based on the proposed project. Respondent DOT has provided Respondent DER reasonable assurances that by use of turbidity screens during construction of the culverts, turbidity values 50 feet down stream from the project site will not exceed 29 N.T.D.'s above background.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED: That Respondent, Department of Environmental Regulation, grant Respondent, Department of Transportation, a dredge and fill permit as set forth with the conditions accompanied in its Notice of Intent to Issue, based on the determination herein that the proposed activities are not contrary to the public interest. RECOMMENDED this 18th day of December, 1986, in Tallahassee, Florida. JAMES E. BRADWELL Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 18th day of December, 1986. APPENDIX TO RECOMMENDED ORDER, CASE NO. 86-1846 Rulings on Respondent, Department of Environmental Regulation's proposed Recommended Order. Paragraph 12, adopted as modified, paragraphs 12, 17 and 18, Recommended Order. Paragraph 13, adopted as modified, paragraphs 15 and 16, Recommended Order. Paragraph 18, rejected as unnecessary for resolution of the issues. Paragraph 19, adopted as modified, paragraph 15, Recommended Order. Paragraph 21, first sentence adopted and remainder rejected as being speculative or conclusionary. Paragraph 24 the parties Stipulation and other statements respecting the parties positions were not incorporated in the Recommended Order as being unnecessary or was not the subject of testimony based on the stipulation. Rulings on Respondent, Department of Transportation's proposed Recommended Order. Paragraph 1 adopted as modified, paragraph 8, Recommended Order. Statutory and Code provisions are not recited in the Recommended as findings of fact. However, official notice was taken of the pertinent rules, regulations and statutory provisions. Paragraph 4 substantially adopted, paragraphs 3, 4 and 5, Recommended Order. Paragraph 12 rejected as being unnecessary to determine the issues posed herein and based on the ultimate determination that the project was in the public interest, paragraph 15, Recommended Order. Rulings on Petitioner's proposed Recommended Order. Paragraph 5, first sentence attributable to Respondent, Department of Transportation, rejected as no evidence was introduced to substantiate that Respondent DOT was unaware that Petitioner was owner and holder of a riparian property right of access. Paragraph 4, last sentence rejected as evidence adduced indicates that Petitioner's rights to gain access between his riparian lands and the C-51 canal was considered, paragraph 16, Recommended Order. Paragraph 5, last sentence rejected as there was a determination that the proposed project was in the public interest and that any impairment of Petitioner's access was counter balanced against public considerations as required in Section 403.918(2), Florida Statutes. Paragraph 16, Recommended Order. Paragraph 6, rejected as being contrary to other credited evidence which indicates that the proper balancing test was in fact made. See paragraphs 10-18, Recommended Order which deals with the consideration of the public interest criteria set forth in Section 403.918(2), Florida Statutes. COPIES FURNISHED: Mark S. Ulmer, Esquire 200 SE Sixth Street, Suite 404 Ft. Lauderdale, Florida 33301 Mel Wilson, Esquire Department of Transportation Mail Station 58 605 Suwannee Street Tallahassee, Florida 32301 Karen A. Brodeen, Esquire Department of Environmental Regulation 2600 Blair Stone Road Twin Towers Office Building Tallahassee, Florida 32301 Victoria Tschinkel, Secretary Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32301

Florida Laws (2) 120.57403.815
# 8
BERNARD M. CAMPBELL AND BESSIE H. CAMPBELL vs SOUTHERN HY POWER CORPORATION AND DEPARTMENT OF ENVIRONMENTAL PROTECTION, 99-000307 (1999)
Division of Administrative Hearings, Florida Filed:Inglis, Florida Jan. 22, 1999 Number: 99-000307 Latest Update: May 17, 2000

The Issue Whether Southern Hy Power Corporation (Hy Power) has provided reasonable assurance, based on plans, test results, or other information, that its proposed hydroelectric facility will comply with the Management and Storage of Surface Water (MSSW) statutes and rules of Southwest Florida Water Management District (SWFWMD) and the Wetland Resource Management permit (WRM)/water quality certification statutes and rules of the Florida Department of Environmental Protection (DEP).

Findings Of Fact By Joint Prehearing Stipulation the parties agreed to the following description of the parties and the project: PARTIES: The Department of Environmental Protection (the Department) is a government agency in the State of Florida existing by virtue of Section 20.255, Florida Statutes, and operating pursuant to Chapters 253, 373, 376, and 403, Florida Statutes, and Title 62, Florida Administrative Code. Under an interagency agreement with SWFWMD, the Department also implements Title 40D, Florida Administrative Code. The Department is located in Tallahassee, Florida, and it has a district office in Tampa, Florida, which district includes Levy County. Southern Hy Power Corporation is a Florida Corporation whose principal offices are located at 7008 Southwest 30th Way in Gainesville, Florida. Betty Berger is an interested party with a mailing address of Post Office Box 83, Inglis, Florida. The Campbells are an interested party with a mailing address of 245 Palm Street, Inglis, Florida. Hy Power applied on August 31, 1993, to the Department for a WRM permit/water quality certification to construct a hydroelectric facility on the Inglis By-Pass Channel. The project is located in Section 12, Township 17 South, Range 16 East, within the town of Inglis in Levy County. The facility consists of a powerhouse located on the south side of the channel measuring about 28 feet wide by 115 feet long, drawing water from the Inglis By-Pass Channel, passing it through a single-pit type turbine and discharging downstream of the Inglis By-Pass Spillway Dam. Hy Power applied on August 4, 1998, to the Department for a MSSW permit for the same proposed hydroelectric facility on the Inglis By-Pass Channel. DESCRIPTION OF PROPOSED PROJECT The project involves the construction of an intake structure, powerhouse, and tailrace on a 0.61-acre area located on the south side of the existing Inglis By-Pass Spillway. The facility will take advantage of the existing hydrostatic head that exists on either side of the Spillway Dam, to generate electricity. The powerhouse will be constructed below grade and will contain a single megawatt turbine and generating unit. The intake structure will divert flows from the upstream side of the Spillway Dam through the powerhouse and back into the By-Pass Channel. A small one-story control building and low profile substation will be constructed above grade within the boundaries of the project area. The hydroelectric project is considered to be a "Run of the River" type of facility because it can only use that water which flows down the existing channel. The geometry of the channel restricts flow to a certain amount, therefore the project cannot create or use flows above those that the By-Pass Channel can provide. The overall authority for control of water levels in Lake Rousseau and flow to the lower Withlacoochee River will remain with the DEP. Lake Rousseau was created in 1909 when the Inglis Dam was constructed across the Withlachoochee River for the purposes of hydroelectric generation. The dam impounds over 11 miles of the Withlachoochee River and forms a lake approximately 3,000 to 4,000 acres in size. Prior to construction of the Barge Canal, water released from the Inglis Dam would flow down the lower portion of the Withlachoochee River about 10 miles before entering into the Gulf of Mexico. In the mid to late 1960's the Army Corps of Engineers (ACOE) built a portion of the Cross Florida Barge Canal between the Gulf of Mexico and Lake Rousseau. The canal severed the Withlachoochee River downstream of the Inglis Dam causing its flow to be diverted into the Barge Canal and then into the Gulf. In order to maintain the flow of freshwater from Lake Rousseau to the lower segment of the River, the 8,900-foot long Inglis By- Pass Channel and Spillway were constructed. The resulting downstream flow ensures navigation in the lower portion of the River and sustains its freshwater and estuarine environment. The water level in Lake Rousseau is generally maintained at an elevation of 27.5 feet above mean sea level (msl) by a combination of the Inglis Dam, the Inglis Lock, which is located in the Barge Canal, and the By-Pass Channel Spillway. These water control features are known collectively as the Inglis Project Works. The water levels in the lower Withlachoochee River immediately to the west of the By-Pass spillway are close to sea level. The resulting head provides the potential energy needed to drive the proposed generator turbine. Under normal conditions the majority of water released from Lake Rousseau flows over the Spillway Dam into the lower segment of the River. According to the DEP Office of Greenways and Trails (OGT), the maximum capacity of the existing By-Pass Channel Spillway is 1,540 cubic feet per second. The hydroelectric project will divert whatever flow is allowed around the existing spillway through the turbine and back into the channel. When the Cross Florida Barge Canal project was cancelled in the 1990's, the ACOE transferred ownership of the property to the State of Florida Board of Trustees, who in turn has leased the property to the DEP for use as the Cross Florida Greenbelt State Recreation and Conservation Area. Management of this property, the control of river flow and lake levels, and operation of the Inglis Project Works are exercised by the DEP's OGT. The OGT utilizes a document entitled "Water Control Plan for Inglis Project Works," dated September 1994, as a guide to operating the structures. The Water Control Plan is incorporated as part of the MSSW intent to issue. On or about April 25, 1995, the Governor and Cabinet, sitting as the Board of Trustees of the Internal Improvement Trust Fund ("Trustees"), approved a request from Hy Power to sublease 0.61 acres of Greenway property at the project site for the purpose of providing electric power. The request was challenged by Berger and the Campbells, and resulted in an administrative hearing held on November 3, 1995. As a result of the hearing, Administrative Law Judge Larry Sartin entered a Recommended Order on July 12, 1996, that the Board enter an order approving execution by the DEP of the proposed sublease and dismissing the petition of Berger and the Campbells. The Recommended Order was approved by the Trustees in its entirety in a Final Order dated April 12, 1996 ("Final Order"). Berger v. Southern Hy Power Corporation et al., Case No. 95-3589. A copy of the Final Order is listed as an exhibit to this Stipulation, and the Findings of Fact and Conclusions of Law contained therein are adopted herein. As previously ruled by the undersigned, the previous Final Order is res judicata as to Petitioners in this case, who are collaterally estopped from challenging any of the findings of fact or conclusions of law contained in the previous Final Order. Petitioners reserve the right to litigate issues of fact and law not addressed in the Findings of Fact or Conclusions of Law contained in that Final Order with regard to the permittability of this project under the WRM and MSSW permitting proposals, and to raise objections as to relevance to this proceedings of any of the Findings of Fact or Conclusions of Law in the Final Order. On February 21, 1995, Hy Power filed application with the Federal Energy Regulatory Commission (FERC) for a conduit exemption from the licensing requirements of Part I of the Federal Powers Act (FPA) for the proposed project. Petitioners and various other persons filed protests with FERC in opposition to the project. On April 21, 1997, FERC issued an Order Granting Conduit Exemption, a copy of which is listed as an exhibit to this Stipulation. Petitioners in this case are collaterally estopped from challenging any of the findings or conclusions contained in that Order Granting Conduit Exemption. Petitioners reserve the right to litigate issues of fact and law not addressed in the Findings of Fact or Conclusions of Law contained in that Order Granting Conduit Exemption with regard to the permittability of this project under the WRM and MSSW permitting proposals, and to raise objections as to relevance to this proceedings of any of the findings or conclusions in the Order Granting Conduit Exemption. FACTS ADDUCED AT HEARING OUTLINE OF PROJECT The proposed project calls for the construction of a water retention structure along the existing By-Pass spillway, the excavation of a large hole in which the powerhouse and turbine would be constructed "in-the-dry" south of the existing dam, and a millrace below the proposed project to return the water back into the existing water course. Conflicting testimony was received regarding the facts surrounding the construction of the project. These included: whether the proposed project will touch the existing wing walls of the existing dam; whether the water retention structure is a coffer dam; whether the proposed water retention structure will safely retain the water; whether the powerhouse and turbine have sufficient negative buoyancy to stay in the ground; whether the proposed excavation will weaken the existing dam; and whether the de-watering of the excavation site will adversely impact ground and surface water. PROJECT DESIGN AND ENGINEERING Engineering for the project was directed by witness Richard A. Volkin, a professional engineer and president and CEO of Engineering Company, Inc., based in Canton, Massachusetts. Mr. Volkin has extensive national and international experience in the design, management, and operation of hydroelectric facilities. Other engineers in Mr. Volkin’s firm worked on the project under Mr. Volkin’s direct supervision, including John May, who became registered as a professional engineer in Florida in order to sign and seal the engineering drawings for the project, which he initially did around 1994. Mr. May became ill and retired in 1998. Because of the length of time the application process has taken and the fact that Mr. May retired, there was a time while the application was pending, when Hy Power's design team was without a registered Florida engineer. When this was brought to the attention of Hy Power, Hy Power substituted Steven Crockett for Mr. May as the Florida-registered professional engineer of record for the project. DEP routinely accepts an applicant’s changing its engineer of record during the course of permit application or construction. Mr. Crockett is a civil and structural engineer who has considerable experience in preparing dam structural designs. Mr. Crockett independently reviewed and evaluated the engineering drawings for the project. Mr. Crockett resealed the drawings by using his drawn seal and signing the plans because his embossed seal was not readily available and time was of the essence. Mr. Crockett has advised DEP that he is now engineer of record for the project, using the appropriate DEP forms. Mr. Volkin’s firm performed all of the studies required by the various agencies, including a geotechnical study of the area, a 50-year analysis of water flow in and out of the Lake Rousseau regime, and water quality evaluations of water in the By-Pass Channel. The ACOE performed deep hole borings of the soils (approximately 36-40 feet below sea level) in the area of the project site to determine soil stabilization conditions at the site when they were constructing the Inglis Project Works. The soil conditions found can reasonably be expected to be similar today. Mr. Volkin’s company also took its own eight-foot deep surface core samples. The purpose of those samples was to verify the ACOE data. The new core samples verified the original core samples. Mr. Volkin also reviewed the ACOE’s engineering drawings developed from construction of the Spillway Dam. These show that the dam is founded on limestone bedding that has been stabilized with concrete. The hydroelectric facility will be constructed adjacent to and south of the dam structure and adjacent to and north of the barge canal. The same type of limestone bedrock is found in the area of the proposed construction. The facility design includes an intake channel on the upstream channel and a tailrace downstream. Those are the only structures that will be constructed next to the By-Pass Channel. The construction of the facility itself will be "in the dry." Hy Power will use coffer dams to seal off the construction site from the By-Pass Channel, so that there will not be water leakage from the Channel into the construction site. Water from the By-Pass Channel will enter the power plant when the coffer dams are lifted and the water is allowed to flow into the facility. The Petitioners presented the testimony of Bill Edwards, an individual with considerable experience in the construction of bridges, cofferdams, and similar concrete structures in aquatic and semi-aquatic conditions. Mr. Edwards is a former hard-hat diver who worked all over the world and worked in Florida for many years prior to his retirement. Based upon his experience and expertise in construction related to projects of this type, his testimony is credible and worthy of consideration. Mr. Edwards pointed out that if the proposed water retention structure did not touch the wing wall of the existing dam, it could not keep the water out and would not have the strength that it needed to retain the water. Hy Power’s witnesses explained that the retention structure would be set close enough to the existing wing wall that waterproofing materials could be placed between the two structures to keep the water out. Further, that the existing plans did not show interior bracing which would be included for structural strength and integrity. In sum, the retention structure will be in contact with existing dam’s wing wall, but will be free standing and not dependent upon the strength of the wing wall for its strength. Mr. Edwards pointed out that a cofferdam by definition has walls on all sides of the structure. The structure proposed by Hy Power did not have walls all the way around the proposed excavation. In rebuttal, Hy Power presented evidence that its plans were conceptual, design drawing and not construction plans. Hy Power represented that in actuality it would put as many walls as were necessary to keep the water out of the hole it intended to excavate. Trash racks will be constructed at the intake structures to protect aquatic life and make sure that trash and vegetation do not enter the intake structure or go down river. The trash rack bars will be two inches on center, which the U.S. Fish and Wildlife Service has determined as the appropriate size for the protection of fish. The turbine blades are "double regulated," and operate generally between 60 and 90 revolutions per minute. The design enables the turbine to operate at a constant speed to generate a consistent flow of electricity, notwithstanding the fact that the flow of the water may vary. The blade speed is not very fast, and the 2.5-meter blades provide a two to three-foot opening. This design acts to prevent fish mortality. There are four ways to shut off the flow of water through the proposed structure: close the pitch of the blades, close the wicket gates, allow the counter balance to the wicket gates to kick in and automatically close the gates, and close off the main gates. This is a fail safe system ("four level redundancy") designed to work upon any failure. Once water goes through the generator, its velocity is reduced to no greater than its intake rate which is a maximum of three feet per second. This prevents the water being discharged from the tailrace from causing erosion. If the head of water in the dam produces a flow exceeding three feet per second, it can be diverted over the other dams which will be functional. The power plant will be encased in concrete, except for a small access way that enables a person to go down a set of stairs to the plant. It will be a sealed, waterproof structure, as required by FERC and the ACOE. This will prevent penetration of groundwater, or flood waters in the event a massive flood overtops the plant. The only water entering the powerhouse will be through the turbine tunnel for power generation purposes. Mr. Edwards pointed out that the powerhouse was a closed structure and as such would have positive buoyancy, that is, it would float. Mr. Edwards pointed out that the proposed site is between the barge canal and By-Pass spillway and there is a great deal of groundwater and potentiometric pressure in the existing water table. In sum, there is a unlimited supply of groundwater at the site, and powerhouse could float out of the ground just like an empty swimming pool. Hy Power presented rebuttal evidence that the weight of the building, the turbine, and the water flowing through the turbine would be close to negative buoyancy, and they would add additional weight to the structure as necessary to keep it in place. The project is designed to generate three megawatts of electric power which is enough electricity to serve between 300 and 3000 homes, depending on usage. The project is designed to be unmanned. This is common for facilities such as this. The plant can be operated by remote control, unlike the existing controls at the By-Pass Dam, which are operated manually. DEP can access, monitor, and control remotely the generator's operation to include shutting the facility down at any time. There will be remote sensors to monitor water elevations. Flood protection will improve because of the ability of DEP to manage water flow from a remote location. If there is any major disruption, the plant will shut itself down. The project is classified as "green power." In other words, it generates natural energy without any disruption to the environment. The project will have minimal to no impact on the environment. There will be no significant changes in water quality compared to existing conditions as a result of either construction or operation of the facility. WRM Permit Criteria Hy Power has provided reasonable assurances that the proposed project will not cause a violation of state water quality standards of Section 403.918(a), Florida Statutes (1991). The parties stipulated that turbidity and dissolved oxygen were the two surface water quality issues of concern in this proceeding. The receiving water body is the Inglis By-Pass Channel. The Inglis By-Pass Channel is a Class III surface water. The project is not located in a OFW. While the lower Withlacoochee River is an OFW, the OFW designation runs up the natural river itself, and does not include the Spillway Dam, tailrace, or the remainder of the By-Pass Channel. There would be no degradation of water quality at the point of contact with the Withlacoochee River OFW. The DEP and FERC looked specifically at potential for turbidity and dissolved oxygen in determining whether the project would violate state water quality standards. The standards for turbidity and dissolved oxygen will not be violated. Because the By-Pass Dam is an under flow structure, a minimum of oxygenation currently occurs as water flows through the existing dam. The proposed project runs the water underground through the generator; however, Hy Power will measure the dissolved oxygen below the dam in the Lower Withlacoochee River. In the event there is any lowering of dissolved oxygen, Hy Power can install a "sparge ring" to reoxygenate the water going through the turbine so that dissolved oxygen remains at current levels. No turbidity will be added to the receiving water as a result of the project, because water velocity is low and the structure is encased in concrete and rip-rap. The only other potential for turbidity would occur when the coffer dams are removed after construction is complete. The coffer dams can be removed with the generator closed to permit any turbidity to settle. The amount of siltation that might occur when the generator is opened would be insignificant. Where a project is not in a OFW, an applicant must provide reasonable assurance that the project will not be contrary to public interest. See Section 403.918(2), Florida Statutes (1991). Hy Power has provided such assurances. The project will not directly affect public health, safety or welfare, or the property of others. See Section 403.918 (2)(a)1., Florida Statutes. There are concerns relating to the structural integrity of the proposed facility and adjacent structures which are discussed extensively below. The project will have no adverse impact upon the conservation of fish and wildlife, including threatened and endangered species and their habitat. See Section 403.918 (2)(a)2., Florida Statutes. While manatees are not likely to be found at the project site, the installation of the trash racks will eliminate any potential adverse impact on manatees. In fact, the racks will be an improvement over the current unprotected Spillway Dam. DEP procedures require a specific manatee control plan be implemented to deal with site specific concerns. The project will not adversely affect navigation or the flow of the water or cause harmful erosion or shoaling. See Section 403.918(2)(a)3., Florida Statutes. The project will not adversely affect fishing or recreation values or marine productivity in the vicinity of the project. See Section 403.918(2)(a)4., Florida Statutes. The permanent project and its construction will cause no significant environmental impacts. See Section 403.918(2)(a)5., Florida Statutes. There will be no adverse impacts to significant historical and archeological resources. Section 403.918(2)(a)6., Florida Statutes. With regard to the impact on current conditions and relative value of functions being performed by the areas affected by the proposed activity, there will be no negative impacts. See Section 403.918(2)(a)7., Florida Statutes. Improvement will result from better control of water flow at the project site, installation of trash racks and implementation of green power. THE FORESEEABLE ADVERSE SECONDARY OR CUMULATIVE IMPACTS Potential adverse secondary impacts related to power transmission are addressed through the fact that there is an existing power line corridor that can be used to transmit the electricity. Any need to change the corridor could be addressed by subsequent DEP permitting. Cumulative impacts are not at issue. Mr. Gammon, with Florida Power, acknowledged that the current electric company, presumably Florida Power, would be required by FERC to transport the electricity generated by Hy Power over its existing corridor and poles. No final decision has been made regarding how to access the site with equipment during construction. Several feasible construction options exist, and there are several ways of accessing the site with heavy equipment vehicles and without impacting wetlands. Any final decision would be subject to DEP approval. Since the project meets the public interest criteria of Section 403.918(2)(a), Florida Statutes, and wetland impacts are minimal, the project is permittable without the need for mitigation. See Section 403.918(2)(b), Florida Statutes. The ACOE has issued a permit for the facility. The permit varies slightly from the DEP intent to issue in the use of reinforced concrete rather than rip-rap on the bottom half of the intake channel. This is to comply with ACOE preference, but the variation has only an environmental benefit. Counsel for Petitioners sought to elicit testimony from Linda Sloan, Executive Director of the Withlacoochee Regional Planning Council, with regard to compliance of the proposed project with the Town of Inglis Comprehensive Plan and Land Development Code. Such compliance is not relevant to this proceeding. At any rate, Ms. Sloan conceded that any prohibition that might apply in the Land Development Code to construction of the proposed facility could potentially be alleviated by exemption or variance provisions in the Code. MSSW PERMIT CRITERIA The project will provide adequate flood protection and drainage in the conventional sense. See Rule 40D-4.301(1)(a), Florida Administrative Code. Because the amount of impervious area is minimal, runoff from the project will not in any way contribute to increased flooding or adversely impact drainage patterns. The total amount of impervious area of the facility is less than that of a single-family residence. SWFWMD rules do not even require MSSW permits for single-family residences because the impact is not significant. The only purpose for requiring a MSSW permit for the project is to review the project’s potential downstream impacts to the watershed, not stormwater runoff from the facility itself. The project will not cause adverse water quality or water quantity impacts on adjacent lands in violation of Chapter 373, Florida Statutes, or cause a discharge that violates state water quality standards. See Rule 40 D-4.301(1)(b), Florida Administrative Code. As indicated by the WRM water quality findings above, the project will not generally violate state surface water quality standards. See Rule 40 D-4.301(1)( c), Florida Administrative Code. The project will not generally cause adverse impact on surface or groundwater levels or flows. See Rule 40 D- 4.301(1)(d), Florida Administrative Code. Since the project is a run-of-the-river, it will not diminish the capability of a lake or other impoundment to fluctuate through the full range established for it under Chapter 40D-8, Florida Administrative Code. The project will not cause adverse environmental impacts, or adverse impacts to wetlands, fish, and wildlife or other natural resources. The project can be effectively operated and maintained. See Rule 40D-4.301(1)(g), Florida Administrative Code. The project is a slow speed, low maintenance facility. The design concept is well established and has been successfully used for many years. Possible adverse affects to public safety are discussed below. The project is consistent with the requirements of other public agencies. See Rule 40D-4.301(1)(i), Florida Administrative Code. Potential harm to water resources within the SWFWMD are discussed below. See Rule 40D-4.301(1)(j), Florida Administrative Code. The proposed project generally will not interfere with the legal rights of others. See Rule 40D-4.301(1)(k), Florida Administrative Code. The proposed project is not against public policy. See Rule 40D-4.301(1)(l), Florida Administrative Code. The project complies with the requirements contained in the Basis of Review. See Rule 40D-4.301(2), Florida Administrative Code. There is a dispute as to whether the project was within or at the edge of the 100-year flood plain. This dispute is related to how one interprets the rule as it relates to the millrace and the location of the facility which is under ground. In the conventional sense, the project is not in the flood plain. Further, the project is designed in such a way, that it is waterproof if it were topped with water. While in the past SWFWMD may have had concerns that the project might cause downstream flooding, SWFWMD currently has no such concerns, given the run-of-the-river status of the proposed project. The operation of the project will not cause downstream flooding. The DEP included in its intent to issue, conditions contained in the sublease between Hy Power and the DEP in order to ensure that the facility would remain run-of-the-river, would comply with the water control plan, and would otherwise comply with the terms of the sublease. The DEP has final control over water flow and can revoke the permit or otherwise take enforcement action against Hy Power if Hy Power fails to comply with the water control plan. GROUNDWATER IMPACTS Operation of the project will not cause groundwater contamination or otherwise have adverse groundwater impacts. Some concerns about groundwater during excavation of the construction site were raised. The conflicting evidence received regarding them is discussed below. An area of concern was the de-watering plan for the project. Everyone agrees there will be some water seepage into the construction site that will have to be pumped out. The parties disagree regarding the amount of water that will have to be removed. Their estimates of amount of water to be removed vary because their estimates of size and over-all depth of the site vary. Petitioners presented credible evidence that a potential exists for the construction site to have a large quantity of water because of its location between two sources of surface water (the By-Pass Channel and Barge Canal), because of the makeup of the subsurface, and because of the depth of the construction. Hy Power credibly represents that if excessive groundwater is found, it can address the adverse impacts through its de-watering plan that would have to be filed with FERC and DEP. The technology exists to address the de-watering of the project. Such plans are routinely considered by DEP after a construction permit is issued and before de-watering occurs. There is very little evidence of sinkhole activity in the project area, and the construction activities are not expected to cause any sinkhole activity. NOISE POLLUTION Mr. Bitter expressed concerns that FERC would require the facility to install a very loud siren that would result in sudden noise adverse to the well-being of neighbors. Mr. Bitter is unfamiliar with FERC siren requirements at run-of the-river hydroelectric facilities. In contrast, Mr. Volkin, who has substantial experience in this area, testified that the only alarm device that would be required would be for the protection of the workers during construction. The purpose of the alarm is to warn persons below a dam spillway of a change in the volume of water being let out of the impoundment. In the case of a run-of-the-river facility, the volume is near constant, changing only gradually. Therefore, even if a warning siren had to be installed its use would be limited to significant changes in flow or testing. This would not constitute a nuisance. Further, the facility is located in the vicinity of the Crystal River Nuclear Power Plant which has its own warning sirens. It would be prudent to make any warning devices required for this structure significantly different from those at the nuclear plant and to limit their use. DAM SAFETY AND FERC REVIEW In reviewing whether Hy Power’s applications complied with the relevant permitting criteria, the DEP took into consideration the review of the facility already performed by FERC. FERC will also be responsible for reviewing the project as it is being constructed. Mr. Edwards also raised concerns about the structural stability of the By-Pass Dam itself. This has been a subject of concern by those responsible for the dam, and a survey of the structure was conducted in 1993, referred to as the Greiner Report. The Greiner Report identified specific maintenance problems that have been and are being addressed by the DEP. However, DEP’s maintenance plan does not address specifically the possibility that the weight of the dam over time has caused some shifting in the dam. Hy Power has only a few core borings and only one at the location of the generator. Hy Power is using the ACOE’s original borings, as confirmed by several new ones, to develop its preliminary plans. The DEP considered FERC and the ACOE as responsible agencies for determining the structural integrity of the dam. DEP has taken FERC’s review of this facility into consideration as part of DEP’s own permitting review. It is normal for DEP to rely on outside sources and agencies for assistance in determining compliance with DEP permitting criteria such as public health and safety, and it is reasonable for DEP to do so in this instance. Most states do not have the full capability to evaluate dam safety, and so they rely on FERC and ACOE. On April 21, 1997, the project received a conduit exemption from FERC. The application process is illustrated in Hy Power Exhibit 11. Hy Power submitted to DEP detailed information about the dam, the associated structures and the proposed project which had been reviewed by FERC and the ACOE, the two agencies in the United States who are responsible for dam structure design, control, and administration. Included in the package was the Greiner Report and Hy Power’s review of it. FERC evaluated the project, the Inglis By-Pass Dam structure, and the proximity of the project to the Dam in relation to structural impact, upstream and downstream impacts, water quality, and environmental issues. Mr. Edwards raised concerns regarding the ability of the limestone bedrock to sustain additional construction in the area of proposed construction. This is a material issue in the controversy which impacts several aspects of the proposed construction. Mr. Edwards pointed out that the barge canal channel was constructed with the use of explosives that caused a fracturing of limestone bedrock. He pointed out that the steel panels, which Hy Power proposes to drive into the bedrock to construct the water retention structure necessary to excavate the hole into which the turbine and powerhouse would be placed, will further fracture this bedrock. This creates two potential dangers. It could permit water to move under and around the bottoms of the panels, potentially scouring the loosened material from the base of the panels and making them unstable and subject to failure. It could weaken the entire southern wing of the existing spillway dam. Mr. Edwards opined that this could result in catastrophic failure of the dam or the coffer dam. Such a failure would cause major destruction and loss of life to those persons living and working in and along the lower Withlacoochee River. Hy Power presented rebuttal evidence that it could and would, if necessary, inject concrete into the limestone to stabilize it and avoid the concerns raised by Mr. Edwards. FERC specifically evaluated concerns raised by project opponents over the poor physical condition of the By-Pass Channel Spillway structures, relying particularly on the 1993 Greiner Report. FERC noted that the DEP had entered into a contract to correct any deficiencies listed in the Greiner Report, which "did not conclude that the deficiencies at the By-Pass Spillway threaten downstream life and property." The FERC review concluded that the dam was safe. To ensure safety, FERC is requiring that Hy Power do a complete stability analysis of the dam prior to any construction. Articles 301 and 302 of the FERC exemption ensure that all final drawings and specifications be submitted to FERC prior to construction, along with a supporting design report consistent with FERC’s Engineering Guidelines; that FERC can require changes to assure a safe and adequate project; and that Hy Power must also submit approved coffer dam construction drawings and specifications at least 30 days prior to starting construction. FERC has its own engineering staff who will go to the site and do their own analysis, along with the ACOE, of the dam and structures, prior to any construction commencing. This is a detailed design review evaluation so that the latest information on the dam will be made known immediately prior to construction, and will prevent any catastrophic event from happening. Under FERC procedures, FERC requires the applicant to obtain the DEP permits prior to requiring applicant to submit more detailed construction designs for FERC's consideration. These more detailed designs in turn will be subject to further review by DEP and FERC. It is assumed that Hy Power will comply with the post- permitting procedures and requirements, and will present complete, detailed construction drawings for FREC and DEP approval. Hy Power’s failure to complete the process would result in denial of a construction permit.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law set forth herein, it is RECOMMENDED: That the DEP enter a Final Order that issues the two permits challenged in this proceedings, WRM Permit No. 38-237096-3.001 and MSSW Permit No. 38-0129249-002, subject to the conditions contained in the Intents to Issue in the respective WRM and MSSW Permits and as described in the Recommended Order. DONE AND ENTERED this 2nd day of March, 2000, in Tallahassee, Leon County, Florida. STEPHEN F. DEAN Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 2nd day of March, 2000. COPIES FURNISHED: Daniel H. Thompson, Esquire Berger Davis & Singerman 215 South Monroe Street, Suite 705 Tallahassee, Florida 32301 Andrew Zodrow, Esquire Department of Environmental Protection 3900 Commonwealth Boulevard Mail Station 35 Tallahassee, Florida 32399-3000 John S. Clardy, III, Esquire Crider Law Firm Plantation Point 521 West Fort Island Trail, Suite A Crystal River, Florida 34429 Teri Donaldson, General Counsel Department of Environmental Protection 3900 Commonwealth Boulevard Mail Station 35 Tallahassee, Florida 32399-3000 Kathy Carter, Agency Clerk Department of Environmental Protection 3900 Commonwealth Boulevard Mail Station 35 Tallahassee, Florida 32399-3000 Bernard M. Campbell Bessie H. Campbell 245 Palm Street Post Office Box 159 Inglis, Florida 34449 Sarah E. Berger Post Office Box 83 Inglis, Florida 34449

Florida Laws (6) 120.5720.255267.061373.026373.414471.025 Florida Administrative Code (6) 40D -4.30140D-4.09140D-4.30161G15-27.00162-4.08062-4.242
# 9
LYKES PASCO PACKING COMPANY vs. SOUTHWEST FLORIDA REGIONAL PLANNING COUNCIL, 76-001735 (1976)
Division of Administrative Hearings, Florida Number: 76-001735 Latest Update: Jun. 15, 1977

Findings Of Fact Application No. 76-00451 seeks a consumptive water use permit for an existing use involving 14 withdrawal points. The application seeks a total average annual withdrawal of 20.2584 million gallons per day and a maximum daily withdrawal of 45.8539 million gallons per day. The water will be used for citrus processing. The Southwest Florida Water Management District's staff recommends issuance of the permit with the following conditions: That the applicant shall install totalizing flow meters of the propeller-driven type on all withdrawal points covered by this permit. That the applicant shall record the pumpage from the above-referenced meters on a weekly basis and submit a record of that pumpage to the district quarterly, beginning on January 15, 1977. That the permit shall expire on December 31, 1980.

Recommendation It is hereby Recommended that a consumptive use permit in the amounts and from the points set forth in the application be granted subject to the conditions set forth in paragraph 2 above. ENTERED this 13th day of October, 1976, in Tallahassee, Florida. CHRIS H. BENTLEY Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 COPIES FURNISHED: Jay T. Ahern, Esquire Southwest Florida Water Management District Post Office Box 457 Brooksville, Florida 33512 Lykes Pasco Packing Company Post Office Box 97 Dade City, Florida

# 10

Can't find what you're looking for?

Post a free question on our public forum.
Ask a Question
Search for lawyers by practice areas.
Find a Lawyer