PHIL`S EXPERT TREE SERVICE vs BROWARD COUNTY SCHOOL BOARD, 06-004499BID (2006)
Division of Administrative Hearings, Florida Filed:Fort Lauderdale, Florida Nov. 09, 2006 Number: 06-004499BID Latest Update: Jun. 11, 2007

The Issue The issues in this bid protest are whether Intervenor's bid was nonresponsive because Intervenor, a corporation formed in 2005, lacks the required five years' experience in the tree trimming business; and, if so, whether Respondent's preliminary decision to award Intervenor the contract at issue was clearly erroneous, arbitrary or capricious, or contrary to competition.

Findings Of Fact Pursuant to Invitation to Bid No. 27-054X (the "ITB"), which was issued on August 10, 2006, Respondent Broward County School Board ("School Board") solicited bids for "Tree Trimming, Planting, Hurricane Cleanup, and Removal Service." Interested vendors were instructed to bid prices on numerous items of service. The items were sorted into two groups, Group A and Group B. The School Board intended to designate a "primary vendor" for each group, who in the ordinary course of events would receive the largest volume of work, but it reserved the right to procure services from the second and third lowest bidders in each group should it become necessary or desirable to do so. Bids were due on September 13, 2006. Section 4 of the ITB contained "Special Conditions" applicable to this procurement. Of interest in this case is Special Condition No. 11, which specified the qualifications a vendor needed to be considered for an award: BIDDER'S QUALIFICATIONS: Bidder must have at least five years experience in tree trimming services within the Miami-Dade, Broward and Palm Beach tri-county area. Bidder must submit, with the bid or uponrequest, the attached Bidder's Profile form. This report must include a minimum of three references from commercial jobs. Each reference should include the address of the actual job, work accomplished and a phone number and contact person. (Emphasis in original.) The Bidder Profile form to which Special Condition 11 referred was located in Section 7 of the ITB as Attachment 1. At the top of the Bidder Profile appeared the following direction and warning: THIS INFORMATION MUST BE SUBMITTED WITH THE BID. FAILURE TO COMPLETE THIS SECTION WILLDISQUALIFY THE SUBMITTED BID. (Emphasis in original.) Paragraph 12 of the Bidder Profile form stated as follows: References Required. Contractor to provide a list of three references. Three references from jobs completed in each of the past three years. More than one dozen vendors timely submitted bids, which the School Board opened on September 13, 2006. Among the bidders were Petitioner Phil's Expert Tree Service, Inc. ("Expert") and Intervenor Innovative Environmental Services, Inc. ("Innovative"). After tabulating the bids, the School Board determined that Innovative was the lowest and best bid from a responsive, responsible bidder with regard to Group A, followed by Expert and All County Tree & Landscape Co., Inc. ("All County"), in that order. Thus, when the award recommendations were posted on September 27, 2006, Innovative was named the intended primary awardee for Group A, Expert the first alternate, and All County the second alternate.1 Innovative is a family business whose principals are Craig and Deborah Conway, husband and wife. In the year 2000, the Conways moved to South Florida from Pennsylvania, where, for more than 20 years, they had operated a tree trimming and land clearing business. After arriving in Florida, the Conways entered into a business arrangement with Donald Richter, a certified arborist, whereby they jointly provided tree trimming services under the name "ASAP Tree Service" or "Don Richter's ASAP Tree Service." In October 2002, the Conways formed a corporation called Independent Equipment South, Inc. ("Independent"). Independent operated an equipment sales and rental business whose inventory consisted of equipment that was not being used in the family's tree trimming operations. Eventually, the Conways' tree trimming service become part of Independent's business portfolio as well. In February 2005, Innovative was incorporated. At all times relevant to this procurement, Mrs. Conway has been the sole corporate officer, Mr. Conway the company's Director of Operations. In addition, at all relevant times, Innovative has employed or otherwise retained Mr. Richter as its certified arborist. Although Innovative and Independent are separate corporate entities, the two businesses operate out of the same location, have the same employees, and use the same equipment. The Conways commonly refer to their businesses as "IES," using that acronym interchangeably to mean either Innovative or Independent (or both). Innovative's Bidder Profile, which was submitted together with its bid, referred to——and incorporated——an attachment entitled, "Brief Company History." The Brief Company History provided background information on Innovative's provenance, albeit from a layperson's perspective. Written by nonlawyers, the summary was not always technically precise, from a legal standpoint, in its descriptions of the various business associations in which the Conways have been involved. Seizing on the least artful phrases, Expert contends that some of the statements in the Brief Company History were false and perhaps even fraudulent. The undersigned, however, finds otherwise. To the point, the Brief Company History reflects an honest attempt truthfully to describe the Conways' family businesses, which is reasonably accurate when read and understood from the perspective of the small-business owners who prepared it. That said, the undersigned finds and determines that Innovative——as distinct from its principals and/or personnel—— did not have five years' experience in the tree trimming business when it bid on the contract at hand, notwithstanding the wealth of tree trimming experience at its disposal. Indeed, having been in existence for fewer than two years at the time it submitted its bid, Innovative, as a separate legal entity, could not possibly have garnered, in its own right, five years' experience doing anything. For the same reason, though Innovative provided plenty of references, the ones that stemmed from jobs completed before February 2005 necessarily related to providers other than Innovative, such as ASAP Tree Service, who actually existed then. To be sure, the providers who earned the references from earlier jobs upon which Innovative relied either were predecessor business associations or individuals who would become personnel of Innovative——but they were not Innovative. Innovative simply could not have performed or completed any jobs before its creation. It is determined, therefore, as a matter of ultimate fact, that Innovative's bid did not strictly conform to the plain language of Special Condition No. 11. Like Innovative, Expert is a family-owned business. Founded in 1985 by Philip Simeone, Expert was incorporated in 1992. Though Expert clearly possesses the length of experience for which Special Condition No. 11 called, Expert failed in its Bidder Profile to provide three references "from jobs completed in each of the past three years," as instructed in paragraph 12 of the ITB's Section 7, Attachment 1. Instead, Expert gave two references from jobs completed in 2006 plus another from a job completed in 2004. Expert's bid did not contain a reference from a job completed in 2005. Expert contends that the School Board should have rejected Innovative's bid as materially nonresponsive (for lacking the requisite five years' experience) and awarded the contract to Expert as the lowest responsive bidder. The School Board and Innovative take the position that the School Board's decision to treat Innovative's bid as responsive was not clearly erroneous, arbitrary, or capricious. Turning the tables, the School Board and Innovative argue that Expert's own bid deviated from Special Condition No. 11, in that Expert failed to provide a reference from a job completed in 2005.2 Yet both assert that "it was reasonable for [the School Board] to waive the requirement of the Bidder Profile form that one . . . reference[] be [from] a job completed in the year 2005." Somewhat inconsistently, however, Innovative argues further that Expert's "bid proposal cannot be sustained"——evidently due to its material nonresponsiveness. This apparent inconsistency follows from Innovative's attempt to play down its alternative position, which is that if "a contrary conclusion [had] been reached as to [Innovative's] experience"—— meaning that if the School Board had chosen not to waive any irregularity concerning Innovative's length of corporate experience——then the "same analysis would apply to" Expert—— meaning that Expert's bid too should have been disqualified. Thus, even though Innovative maintains that the School Board reasonably waived any irregularities in Expert's bid, Innovative is unwilling to concede that the School Board did not err in determining that Expert's bid was responsive, evidently out of concern that such an admission might compromise its fallback position. Innovative's bottom line is that if Innovative's bid were to be disqualified as materially nonresponsive, then Expert's bid would need to be rejected, too.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the School Board enter a Final Order that (a) declares Innovative's bid to be materially nonresponsive and, accordingly, rescinds the proposed award to Innovative; and (b) declares Expert's bid to be materially nonresponsive and, accordingly, rejects the same. Because the choice of remedies for invalid procurement actions is ultimately within the agency's discretion, the undersigned declines to make a recommendation as to whether the School Board should award the contract to All County (which was the putative "second alternate") or reject all bids and start over. DONE AND ENTERED this 19th day of March, 2007, in Tallahassee, Leon County, Florida. S JOHN G. VAN LANINGHAM Administrative Law Judge Division of Administrative Hearings Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 19th day of March, 2007.

Florida Laws (2) 120.569120.57
# 1
CON-AIR INDUSTRIES, INC. vs SEMINOLE COUNTY SCHOOL BOARD, 98-004714BID (1998)
Division of Administrative Hearings, Florida Filed:Sanford, Florida Oct. 27, 1998 Number: 98-004714BID Latest Update: Jan. 20, 1999

The Issue Whether the School Board of Seminole County's, notice of intent to award Bid No. 102589, for air filter maintenance, service, and replacement to Filter Service and Installation Corporation was clearly erroneous, contrary to competition, arbitrary, or capricious.

Findings Of Fact The Seminole County School District is a political subdivision of the State of Florida, created by Article IX, Section 4, Florida Constitution. The powers and duties of the school board are enumerated in Chapter 230, Florida Statutes. The Superintendent of the Seminole County School District is a constitutional officer, whose office is created by Article IX, Section 5, Florida Constitution. The powers and duties of the Superintendent are enumerated in Chapter 230, Florida Statutes. The Seminole County School Board issued a call for bids for air filter maintenance service and replacement under Bid No. 102589 on September 14, 1998. Bids were submitted by Con-Air Industries, Inc., the protester, and Filter Service & Installation Corp., the apparent low bidder. The bids were opened on September 28, 1998, and were evaluated. Each bidder was determined to be a responsible bidder to the CFB. Intervenor submitted the lowest numerical bid. On October 1, 1998, Respondent's staff recommended that the CFB be awarded to Intervenor. The decision to recommend the award of the filter service Bid No. 102589 complies with the bid specifications. The instructions to bidders, as stated on the Proposal Form, direct a bidder to total lines A-C and to enter the total at line D. The instructions state that a bidder is not to include the cost as stated at lines E & F in the total. The proposal form then states that the total cost, as stated at line D shall be used to determine the apparent low bidder. The bid proposal document stated that the total of the prices stated at items A, B, and C would be used to determine the lowest numerical bid. The bid proposal document stated that the Respondent reserves the right to negotiate unit cost proposed for item E. The line D total submitted by the Petitioner is stated at $3.45. The line D total submitted by the apparent low bidder, is stated at $2.60. Intervenor submitted the lowest numerical bid. Intervenor does business under the fictitious name Filter Sales & Service. That fictitious name has been registered with the Secretary of State for the State of Florida. Filter Service & Installation Corp., and Filter Sales & Service are one and the same. The reference by Intervenor at line F to "Per Price Sheet" and the failure of Filter Service & Installation Corp. to attach a price sheet to its proposal form is not a material deviation from the requirements of the bid specifications. The total at line D is the total used to determine the lowest bidder. Filter Service & Installation Corp. is the lowest and best bid from a responsive and responsible bidder. The Petitioner followed the procedure set forth in the bid proposal document in making a determination that the Intervenor was the lowest numerical bidder. Petitioner reserved the right to reject all bids and to waive any informalities. Petitioner failed to prove that the notice of intent to award the bid to Intervenor was clearly erroneous, contrary to competition, arbitrary, or capricious.

Recommendation Upon the foregoing findings of fact and conclusions of law, it is RECOMMENDED that the Respondent award the contract for filter maintenance, service, and replacement under Bid No. 102589 to the Intervenor, Filter Service and Installation Corp., as recommended by its staff. DONE AND ENTERED this 11th day of December, 1998, in Tallahassee, Leon County, Florida. DANIEL M. KILBRIDE Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 Filed with the Clerk of the Division of Administrative Hearings this 11th day of December, 1998. COPIES FURNISHED: Robert N. Hering, President Con-Air Industries, Inc. 3055 Pennington Drive Orlando, Florida 32804 Ned N. Julian, Jr., Esquire Seminole County Public Schools Legal Services Department 400 East Lake Mary Boulevard Sanford, Florida 32773-7127 Robert W. Smith, Esquire 430 North Mills Avenue, Suite 1000 Orlando, Florida 32803 Dr. Paul J. Hagerty, Superintendent Seminole County Public Schools 400 East Lake Mary Boulevard Sanford, Florida 32773-7127

Florida Laws (1) 120.57
# 2
AMEC CIVIL, LLC vs DEPARTMENT OF TRANSPORTATION, 04-003169BID (2004)
Division of Administrative Hearings, Florida Filed:Mango, Florida Sep. 03, 2004 Number: 04-003169BID Latest Update: Feb. 22, 2005

The Issue Whether the Department of Transportation’s decision to reject all bids for Financial Project No. 209278-1-52-01 (J. Turner Butler Blvd.) a major interchange in Duval County, Florida, was exercised illegally, arbitrarily, dishonestly or fraudulently.

Findings Of Fact On April 1, 2004, the Department of Transportation advertised its Bid Solicitation Notice (BSN), for the JTB Project. H. W. Lochner, Inc. (Lochner) designed the JTB Project. Petitioner, Superior Construction, and Archer Western Contractors, LTD, submitted bids on May 26, 2004. Petitioner had the apparent low bid, and Superior had the second apparent low bid. On or about May 27, 2004, Robert Burleson, President of the Florida Transportation Builders Association (“FTBA”), contacted the State Construction Engineer, Ananth Prasad, P.E., and alerted him to potential issues regarding MOT phasing. (T. p. 876, lines 18-24; p. 880, lines 14, 15). Richard Ayers, of Superior Construction, called the Jacksonville Urban Office of the Department of Transportation, District 2, alerting the District to the concerns regarding the maintenance of traffic issues. Ayers had reviewed the bid and plans generally to assess its bid in light of the Petitioner's bid, and had discovered in the process MOT issues that he believed would add substantially to the costs and time required to construct the project. As a result of these calls, Robert Hansgen, P.E., District 2 Resident Engineer, was directed by someone within the Department to review the MOT plans. On June 1, 2004, Mr. Hansgen forwarded to Henry Haggerty and Al Moyle a memorandum outlining seven areas of MOT concern relating to the "constructability" and safety of the JTB project. On June 1, 2004, Hansgen's memorandum was forwarded to Mohammed Majboor, P.E., Design Consultant Engineer for the Department, who forwarded the memo to Lochner. Lochner reviewed its plans in light of the Hansgen memorandum and forwarded its response on June 3, 2004, to Hansgen, who reviewed the responses and added his comments. He e-mailed Henry Haggarty seven concerns he had with the MOT plans. On June 2, 2004, Allen Moyle, Jacksonville Construction Engineer, received Hansgen's and Lochner's responses regarding the MOT plans and determined that the project plans needed revisions because of safety issues. Moyle concluded that all the bids needed to be rejected in light of the MOT revisions. He transmitted a request to Cathy Thomas at the Department's headquarters to arrange a meeting with Lochner to commence revision of the plans at the earliest possible date. On June 8, 2004, Hansgen briefed the District 2 Secretary, Schroeder, and other District 2 staff members on the issues regarding maintenance of traffic issues based on his memo, a marked-up copy of the MOT sheets, and pictures. Rejection of all bids was discussed at this meeting. Mr. Hansgen testified at the formal hearing concerning his findings and his actions with the aid of the original memorandum and Respondent's Exhibits 1 and 2. Mr. Hansgen's concerns were about safety issues and included the reduction of traffic lane widths in areas to 11 feet where barrier walls would be erected on both the inside and outside medians where traffic would be traveling at 55 miles per hour. Another concern was the length of these lanes that would be restricted by concrete barriers. These barriers prevented easy access of emergency vehicles in these areas, which presented a significant hazard at this interchange, which accesses a major hospital complex. Mr. Hansgen’s also identified an inconsistency regarding where the contractor could work in an area close to the barrier wall; a portion of the roadway where a cross slope or tilting of the traveling lane created dangerous vehicle control issues; and plans to widen a portion of the roadway while vehicles traveled on the same portion of roadway which would require further narrowing of lanes. Because the State of Florida has one of the highest fatality records in the nation in work zones, the Department is very concerned about this issue. After the meeting on June 2, 2004, the Jacksonville Urban Office for District 2 recommended rejection to DOT in Tallahassee of all bids based on the need to “clarify uncertainties within the phasing of the maintenance of traffic (MOT) plans.” The recommendation of District 2 was reviewed by the Technical Review Committee, which is comprised of six voting members. On June 9, 2004, the Technical Review Committee recommended rejection of all bids on the JTB Project to the Contract Awards Committee based upon MOT safety issues. The Contracts Award Committee, composed of three voting members, met on June 15, 2004, to consider the recommendations regarding the JTB Project of the Technical Review Committee and District 2. The Contracts Award Committee concurred with the recommendations of the Technical Review Committee and District 2 and rejected all bids based upon MOT safety issues. The Department posted its notice of intent to reject all bids on June 17, 2004. The Petitioner filed a Notice of Intent to Protest the Department’s rejection of all bids with a Formal Written Protest, filed on July 1, 2004, including an appropriate protest bond. The Department’s engineers met with engineers from H.W. Lochner, Inc., to discuss the issues of concern raised in the Hansgen memorandum. The Department commissioned Lochner to revise the plans to enhance the safety features for MOT, and certain other enhancements. Lochner and the Department entered into Supplement Agreement #13 that included both the requested enhancements and the changes to accommodate the concerns referenced in the Hansgen Memorandum. Richard Kelly testified regarding “animus,” and “dislike” displayed by employees of the Department. He pointed to past decisions and actions of Department employees as proof of “dislike” and “animus." These included a Letter of Concern to the Petitioner, on April 16, 2004, from the Department outlining five areas the Department had identified as important in making a determination on the pre-qualification of the Petitioner for bidding on Department contracts for the 2004-2005 fiscal year. Also mentioned were disputed issues between the Department and the Petitioner arising during construction of the I-95/I295 Interchange Project, including Jacksonville ordinances on noise ordinance, and trees and deficiency letters from the Department to AMEC Civil. In addition, the disqualification of Morse Diesel, LLC, as the Petitioner was formerly named, from bidding on construction contracts with the State of Florida, and in 2002, the revocation of the pre-qualification of the Petitioner to bid on DOT projects were described. Ananth Prasad, P.E., who was identified by the Petitioner's witnesses as a primary source to opposition to the Petitioner, testified that he did not hold the position of State Construction Engineer in 2000, and was not involved in the decision to deny pre-qualification of Morse Diesel. Mr. Prasad also was not involved with the initial decision to revoke the pre-qualification of AMEC in 2002. Mr. Prasad does not personally hold a position on the Technical Review Committee. Mr. Prasad did not vote on the decision to recommend rejection of all bids on the JTB project. The decision to reject all bids for the JTB Project was made by the Contracts Award Committee based on recommendations from the Technical Review Committee, and District 2. The Department’s Contracts Award Committee exercised its statutory authority to reject all bids based on concerns regarding the MOT phasing.

Recommendation Based on the foregoing findings of fact and Conclusions of Law, it is Recommended that the Department of Transportation enter a final order dismissing Petitioner’s Formal Written Protest concerning the bid rejection for the project in this litigation. DONE AND ENTERED this 28th day of December, 2004, in Tallahassee, Leon County, Florida. S STEPHEN F. DEAN Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 28th day of December, 2004. COPIES FURNISHED: F. Alan Cummings, Esquire S. Elysha Luken, Esquire Smith, Currie & Hancock, LLP 1004 DeSoto Park Drive Post Office Box 589 Tallahassee, Florida 32302-0589 Mike Piscitelli, Esquire Vezina, Lawrence & Piscitelli, P.A. 305 East Las Olas Boulevard, Suite 1130 Fort Lauderdale, Florida 33301 Calvin C. Johnson, Esquire C. Denise Johnson, Esquire Department of Transportation 605 Suwannee Street Haydon Burns Building, Mail Station 58 Tallahassee, Florida 32399-0450 James C. Myers, Agency Clerk Department of Transportation Haydon Burns Building, Mail Station 58 605 Suwannee Street Tallahassee, Florida 32399-0450

Florida Laws (2) 120.57337.11
# 3
EROSION STOPPERS, INC. vs DEPARTMENT OF TRANSPORTATION, 07-004823BID (2007)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Oct. 22, 2007 Number: 07-004823BID Latest Update: May 01, 2008

The Issue Whether the Department’s intended award of contract E2K97 for Asset Maintenance of the Duval County Roadways is contrary to the agency’s governing statutes, the agency rules or policies or the bid or proposal specifications.

Findings Of Fact The following facts were agreed between the parties in their Joint Pre-Hearing statement: On June 18, 2007, FDOT posted the solicitation for asset maintenance of the Duval County Roadways through procurement E-2K97. The RFP requested technical proposals and bids for a five-year contract for maintenance of identified roads in Duval County. The RFP provides that the scoring of the technical proposals is to be weighted as follows: Administration Plan (20%), Management and Technical Plan (30%), Operation Plan (30%), and Plan for Compliance with Standards (20%). ESI did not file a protest of the RFP's terms, conditions, specifications, or provisions governing the method of ranking proposals within 72 hours of the posting of the solicitation. A mandatory pre-bid meeting was held on July 10, 2007. The technical and price proposals for this project were due by August 9, 2007. Four firms submitted timely proposals in response to the RFP. They were ESI, DBI, Infrastructure Corporation of America (ICA) and VMS. The proposals were evaluated by three registered civil engineers who are employed by FDOT: Jerry Ausher, Julius Rinosa, and Mark Kuhn. All four firms were determined to be responsive and received scores on their technical proposal and price proposal. DBI's average score on its technical proposal was 88, the highest of the four firms. ESI's average score on its technical proposal was 75.33, the lowest of the four firms. ESI's price proposal bid was $44,759,500.00, the lowest of the four firms. DBI's price proposal bid was $48,748,886.00, the second lowest of the four firms. After combining the technical scores and price proposal scores, the total proposal scores for the four firms were as follows: DBI = 89.14, VMS = 85.19, ESI = 82.73, and ICA = 82.68. On September 4, 2007, FDOT posted its notice of intended award to DBI as the winning bidder. ESI filed a notice of intent to protest on September 7, 2007, followed by a formal written protest on September 17, 2007. DBI filed a Petition to Intervene which was granted on November 7, 2007. As the intended awardee, DBI has a substantial interest in the outcome of this proceeding and thus, has standing to intervene.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is recommended that Petitioner’s Amended Formal Written Bid Protest be dismissed. DONE AND ENTERED this 31st day of March, 2008, in Tallahassee, Leon County, Florida. S DON W. DAVIS Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 31st day of March, 2008. COPIES FURNISHED: Cynthia S. Tunnicliff, Esquire Brian A. Newman, Esquire Pennington, Moore, Wilkinson, Bell & Dunbar 215 South Monroe Street, Second Floor Tallahassee, Florida 32301 Denise Johnson, Esquire Assistant General Counsel Florida Department of Transportation Office of the General Counsel Haydon Burns Building 605 Suwannee Street, Mail Stop 58 Tallahassee, Florida 32399-0458 Brant Hargrove, Esquire 2104 Delta Way, Suite 9 Tallahassee, Florida 32303 J. Reuben Hamlin, Esquire Post Office Box 1620 Newberry, Florida 32669 Stephanie Kopelousos, Secretary Department of Transportation Haydon Burns Building 605 Suwannee Street Building, Mail Stop 57 Tallahassee, Florida 32399-0450 Alexis M. Yarbrough, General Counsel Department of Transportation Haydon Burns Building 605 Suwannee Street Building, Mail Stop 58 Tallahassee, Florida 32399-0450 James C. Meyers Clerk of Agency Proceedings Department of Transportation Haydon Burns Building 605 Suwannee Street Building, Mail Stop 58 Tallahassee, Florida 32399-0450

Florida Laws (1) 120.57
# 4
ROCHE DIAGNOSTIC SYSTEMS vs DEPARTMENT OF CORRECTIONS, 96-005570BID (1996)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Nov. 22, 1996 Number: 96-005570BID Latest Update: Feb. 12, 1997

The Issue The issue is whether Respondent Department of Corrections acted in a manner contrary to its governing statutes, rules or policies, or the bid specifications in giving notice of its intent to award the contract for Invitation to Bid No. 96-DC- 6847R to Intervenor Behring Diagnostics, Inc.

Findings Of Fact On February 19, 1996 the Department issued an ITB for the provision of automated drug testing equipment, an automated data management system, and drug assays for the analysis of urine specimens collected at the Department’s major institutions and community facilities. After receiving and reviewing bids from Roche, Behring, and Abbott Laboratories (Abbott), the Department issued a Notice of Intent to Reject All Bids on April 10, 1996. On April 30, 1996 the Department issued ITB 96-DC-6847R for the same services. The same three vendors, Roche, Behring and Abbott, submitted bids which were opened on June 5, 1996. On its face, Roche’s bid of $.60 per test was the lowest cost of the three bids. Behring submitted a bid of $.90 per test. The Department’s evaluation committee correctly determined that bids submitted by Roche and Abbott were not responsive to the bid specifications. Roche’s bid was not responsive because: (1) it failed to include the cost of a printer at each site as part of the equipment package; and (2) it failed to indicate the vendor’s unconditional willingness to provide litigation support at no cost to the Department in defense of a legal challenge to the vendor’s technology. The bid specifications clearly required that printers be included as part of the computer hardware. Roche did not list printers anywhere in the narrative portion of its bid response. Roche’s response stated that it covered all items pertaining to the system hardware portion of the bid. The response indicated that Roche would provide the Department with Antek-LabDAQ report management software and listed specific items of hardware that would be included. But Roche did not list a printer. Roche’s bid response stated that the LabDAQ system would print reports. Roche included copies of a sample report sheets. Roche submitted other information describing the LabDAQ system that contained pictures of a printer. It also submitted a magazine article reviewing the LabDAQ system which listed an “Okidata printer” as part of the required hardware. However, the article noted that the software could be purchased separately. Submittal of this information was insufficient to indicate that Roche’s bid included the cost of a printer. Roche’s failure to include a printer in its bid was a material deviation from the bid requirements. The ITB clearly required the vendor to provide unequivocal litigation support at no cost to the Department if someone challenged the provider’s technology in a court action. This was a material requirement in the ITB. Roche responded that “upon request from the State and if deemed necessary Roche will provide documentation, affidavits and sworn testimony to substantiate the performance of the technology incorporated in the OnLine system.” (Emphasis added.) This ambiguous response was not an absolute commitment for Roche to provide the litigation support required by the specifications. In one section of Roche’s response it stated that it was “not aware of any past or present lawsuits that have been filed in connection to the COBAS MIRA Plus or the OnLine reagents.” In another section, Roche responded that a federal district court upheld drug testing results provided from a COBAS/Online system. These inconsistent statements may have resulted in a minor deviation from the bid specification. However, they are sufficient to further undermine confidence in Roche’s bid as submitted. During the hearing, Roche presented testimony that it intended for its bid of $.60 per test to include both printers and unconditional litigation support. This testimony constitutes an inappropriate attempt to amend Roche’s bid response. It does not change the fact that Roche’s bid, on its face, was not responsive as submitted. On the other hand, Behring’s bid was responsive to the specifications. It contained only one minor irregularity that provided no advantage to Behring. Roche has presented no evidence to the contrary. The Department’s evaluation committee did not complete the scoring process to compare the three vendors’ scores. Such a comparison is unnecessary where there is only one responsive bidder. By letter dated August 26, 1996 the Department again informed the vendors that it intended to reject all bids and issue a new request for proposals in September. Even though the Department had determined that Behring was the only responsive bidder, the letter did not address the responsiveness of any of the bids. The letter stated that the Department anticipated making changes to the specifications that would require a more structured response, i.e. revise the ITB to include a checklist for every required item which the bidder would cross-reference in its bid response. There is no evidence that the Department anticipated making changes to the substance of the specifications. On or about September 5, 1996 Behring sent the Department a Notice of Intent to protest the rejection of all bids and subsequently filed a timely formal written protest. In its formal protest, Behring referred to the Department’s conclusions in a memorandum dated August 23, 1996 that Behring was the only bidder to submit a conforming bid. Roche did not file a protest of the decision to reject all bids. On or about September 26, 1996 the Department sent Roche notice of Behring’s protest and enclosed a copy of Behring’s formal protest in Division of Administrative Hearings Case Number 96-4475BID. Roche did not intervene in the bid protest. The final hearing in the bid protest was scheduled for final hearing on October 23, 1996. The day before the hearing, representatives of the Department and Behring met to discuss the possibility of settling the case. Shortly before the settlement conference, the Department’s counsel called a Roche representative, Betty Bennett, and informed her that Behring had requested a meeting to attempt to resolve the protest. He was unable to make contact with an Abbott representative. No one from Roche attended the meeting. The Department did not issue any formal written notice that it intended to settle the case with Behring. The Department did not know prior to the meeting what the parties would discuss. The Department did not attend the meeting expecting to “negotiate a contract.” At the meeting, Behring initially took the position that the Department should award the contract to Behring at $.90 per test and not seek further competitive bids. The Department took the position that the contract should be subject to additional competitive bidding to determine what the result would be with more than one competitive bid. After further discussion, Behring offered to lower its bid price. The Department’s representatives left the room to discuss the offer. Upon their return, Department representatives made Behring a lower counteroffer. Behring and the Department eventually arrived at an oral settlement under which the Department would award the contract to Behring at a price of $.77 per test and Behring would dismiss its protest. The Department based its decision to settle the bid protest with Behring on the following: (a) the risk of losing the bid protest and being required to pay Behring $.90 per test; (b) the desire not to further extend the existing contract at the current price of $1.07 per test; (c) the risk that a third attempt to solicit competitive bids would result in another protest and further delay; (d) the fact that Behring had submitted responsive bids to the two previous solicitations; (e) the assumption that subsequent bids by Roche and Abbott would be higher when they included the omitted items that caused their rejection. There is no persuasive evidence to indicate that the Department’s reasons for settling Behring’s bid protest were pretextual or otherwise invalid. The Department correctly concluded that it might have to pay Behring $.90 per test if it lost the bid protest regardless of the applicable standard of proof in that proceeding. The Department also was justified in assuming that Roche’s bid price would be higher when it included the previously omitted printers. For these and other reasons set forth above in the Findings of Fact, the Department’s decision to settle the case by negotiating a lower contract price with Behring was in the best interest of the state of Florida. On October 23, 1996 the Administrative Law Judge in Case No. 96-4475BID entered an order closing the file of the Division of Administrative Hearings and relinquishing jurisdiction to the Department. The Department did not issue a Final Order setting forth the final disposition of the case. By letter dated October 30, 1996 the Department informed Roche and Abbott that it had negotiated a satisfactory contract with Behring pursuant to Rule 60A-1.018(1)(b), Florida Administrative Code. This letter advised Roche that the Department intended to award the contract to Behring. In the letter, the Department gave Roche the opportunity to request a hearing pursuant to Chapter 120, Florida Statutes, to protest the intended agency action. By letter dated November 8, 1996, Roche protested the notice of intended award to Behring. Without objection, Roche submitted an amended petition on December 10, 1996. Behring filed a petition for leave to intervene on November 27, 1996. An order dated December 11, 1996 granted that motion.

Recommendation Based on the foregoing Findings of Facts and Conclusions of Law, it is RECOMMENDED that the Department of Corrections enter a Final Order awarding the contract for ITB No. 96-DC-6847R to Behring Diagnostic, Inc., and dismissing the protest of Roche Diagnostic Systems. DONE and ENTERED this 12th day of February, 1997, in Tallahassee, Leon County, Florida. SUZANNE F. HOOD Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (904) 488-9675 SUNCOM 278-9675 Fax Filing (904) 921-6847 Filed with the Clerk of the Division of Administrative Hearings this 12th day of February, 1997.

Florida Laws (3) 120.569120.57287.057
# 5
FAIRCHILD CORPORATION vs DEPARTMENT OF TRANSPORTATION, 90-003122BID (1990)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida May 23, 1990 Number: 90-003122BID Latest Update: Jul. 30, 1990

Findings Of Fact State Project No. 46090-3511 (the project) is for construction of the West Bay Bridge on State Road 79 in Bay County, Florida. Competitive bids on the project were solicited in February, 1990. The bid letting on the project was held in March, 1990. The Petitioner, Fairchild, the Hardaway Company and ten other contractors bid on the project. The Hardaway Company submitted the lowest bid on the project in the amount of $9,487,258.17. Fairchild submitted the next lowest bid in the amount of $9,835,279.34. Divergent Unit Prices and Imbalances. The part of the Hardaway Company's bid relating to construction of the foundation for the approaches to the bridge (the "structural bid") is obviously below reasonable cost in several respects. The contract specifications require the use of sand fill, shell fill, reinforcement grid (biaxial type 2), and Class III (seal) concrete. The Hardaway Company's unit prices for these items were, respectively, one dollar per cubic yard for the sand fill, fifty cents per cubic yard for the shell fill, twenty-five cents per square yard for the reinforcement grid, and ten cents per cubic yard for the Class III seal concrete. As a result, the Hardaway Company's bid for these items is obviously significantly below reasonable cost and approximately $95,500 below what Fairchild bid for the same portion of the contract. In contrast to the sand fill, shell fill, reinforcement grid and Class III concrete, the Hardaway Company's bid on some of the other parts of the structural bid were relatively high. The reinforcing steel for the substructure (Item 415-1-5) was bid at approximately twice reasonable cost (80 a pound versus, e.g., 42 in Fairchild's bid), resulting in $609,936.80 attributable to that part of the bid versus, e.g., $320,216.82 for Fairchild. The statistical average (the DOT's so-called "average 2") for the other serious bidders under this item also was 42 a pound. The Hardaway Company also bid obviously in excess of reasonable cost for the lump sum item of mobilization for pile installation--$600,000 versus $125,000 in Fairchild's bid and less in the bids of several of the others bidders. (The statistical average for the other serious bidders under this item was $225,000.) But the Hardaway Company bid only $60,000 for the lump sum item for removal of existing structures (versus $160,000 in Fairchild's bid) and only $30,000 for the lump sum item for removal and disposal of fender system (versus $110,000 in Fairchild's bid). The portion of the Hardaway Company's bid attributable to mobilization for the roadway work is significantly less than the Fairchild bid under this item ($200,000 versus $375,000) and partially counterbalances the excess in the part of the Hardaway bid for mobilization for the pile installation. The portion of the Hardaway Company's bid attributable to clearing and grubbing also was high, at $20,000 an acre versus a statistical average of $4,200 an acre for the other serious bidders, resulting in $216,000 for the Hardaway Company bid versus, e.g., $32,400 for the Fairchild bid and the $45,360 statistical average. DOT Review Procedures. Section 2-6 of the DOT's Standard Specifications applicable to the project provides: 2-6 Rejection of Irregular Proposals. A proposal will be subject to being considered irregular and may be rejected if it shows omissions, alterations of form, additions not called for, conditioinal or unauthorized alternate bids, or irregularities of any kind; also if the unit prices are obviously unbalanced, either in excess of or below the reasonable cost analysis values. The DOT is in the process of formulating a policy on the use of the Technical Review Committee in the bidding process. A proposed procedure has been developed, which has not yet been made final and has not yet been signed by the Secretary of the DOT, under which the Technical Review Committee would review the low bid on each contract, among other things not applicable to this case, for "any significant irregularities in unit bid prices" and for "unbalanced bidding." The DOT has not yet defined "any significant irregularities in unit bid prices" or "unbalanced bidding" for purposes of defining the event that triggers review by the Technical Review Committee. The DOT Director of the Office of Construction, Robert Buser, is of the opinion that the unit prices the Hardaway Company bid for the sand fill, the shell fill, the reinforcement grid and the Class III seal concrete are "significant irregularities in unit bid prices." On the other hand, the DOT's Preliminary Estimates Engineer, Robert Griner, who, unlike Buser, is a member of both the Technical Review Committee and its Preliminary Technical Subcommittee, and is of the opinion that the Hardaway bid for the sand fill, the shell fill, the reinforcement grid and the Class III (seal) concrete are "mathematical imbalances," not "significant irregularities in unit bid prices," which he would define as bids that omit a unit price, whose numerical values do not match words used to express the values, or that are not signed. Under Griner's approach, which was followed in this case, the Preliminary Technical Subcommittee looks at "mathematical imbalances" to see if they are "material imbalances." If the Preliminary Technical Subcommittee decides that it is not a "material imbalance," it simply reports this finding at the outset of the meeting of the Technical Review Committee, which accepts the finding and does not itself consider the matter any further. Only if the Preliminary Technical Subcommittee reports a "material imbalance" does the Technical Review Committee further consider the question. Front-end Bidding. Under the DOT contract for the project, like other items in the specifications, mobilization and land clearing and grubbing are paid in installments as the work proceeds. But, unlike the other items, all of the portion of the contract attributable to mobilization and land clearing and grubbing is paid by the time the entire project is half completed. Similarly, a contractor is paid for reinforcement steel (substructure) when it is delivered to the site. As a result, by shifting dollars in a bid to these "front-end," lump sum items, a contractor can manipulate the bid process and contract to reasonably insure himself of early payment of these inflated items regardless what may happen to the project later. In analyzing these front-end, lump sum items, Griner treated them (along with the unreasonably low bids on the sand fill, shell fill, reinforcement grids and C III seal concrete) as "mathematical imbalances." Following the guidance of a Federal Highway Administration (FHWA) memorandum, dated May 16, 1988, on the subject of "Bid Analysis and Unbalanced Bids," Griner analyzed the Hardaway bid to be sure it would not be susceptible to cost overruns (it was not) and to be sure the quantities were correctly estimated (they were). He also analyzed the additional cost to the DOT of paying the Hardaway Company early (by the half way point of the project) for the inflated front-end items to determine whether the "mathematical" imbalance was "material," i.e., whether "the mathematically imbalanced bid will result in the lowest ultimate cost to the Government." Based on a twelve percent interest rate, Griner calculated that the inflated front-end items would cost the DOT approximately an additional $98,000, 1/ still much less than the difference between the low Hardaway bid and any other bid. Based on this calculation, Griner concluded that the "mathematical imbalance" in the Hardaway bid was not a "material imbalance" and did not require the award of the bid to Fairchild or one of the other bidders. Griner overlooked and did not apply another portion of the method of analysis in the FHWA memorandum on "Bid Analysis and Unbalanced Bids" that states: There are numerous reasons why a bidder may want to unbalance his/her bid on a contract. One reason is to get more money at the beginning of the project. The bidder does this by overpricing the work done early in the project. This is called "front loading" the contract. The leading case in the "front loading" area is Matter of: Riverport Industries, 64 Comp. Gen. 441 (1985). Here the Comptroller General held that if the bid is front loaded, regardless if it is the lowest bid, it "should be viewed as materially unbalanced since acceptance of the bid would result in the same evils as an advance payment. An advance payment is prohibited by law." The "front loading" may also be materially unbalanced due to the cost of money that must be paid out early versus over the normal construction fo the project. Under the Hardaway Company bid, the pile mobilization, the land clearing and grubbing, and the reinforcement steel (substructure) parts of the bid are "front-ended." 2/ Under the method of analysis suggested by the FHWA memorandum, the Hardaway Company would be paid approximately $428,000 in "advance payments" under these two items if it is awarded the contract. Approximately $375,000 in pile mobilization, $183,600 in land clearing and grubbing, and $289,700 in the reinforcement steel were shifted to these front- end items from the unbalanced sand fill, shell fill, reinforcement grid, and Class III (seal) concrete items. These dollars The shifted dollars are estimated by taking the difference between the statistical average for these items and the Hardaway bid on them. Since roiughly half of the shifted dollars would be paid earlier than they would be paid if they were bid under the sand fill, shell fill, reinforcement grid and Class III (seal) concrete items, the amount of "advance payment," under the FHWA analysis would be approximately $428,000. Griner did not explain why he only followed part, but not all, of the method of analysis suggested by the FHWA memorandum, other than to say he overlooked it. But he also testified that it is common practice for contractors to submit mathematically unbalanced bids, and the DOT always analyzes them the way he did in this case. Indeed, in the March, 1990, bid letting, Griner found "mathematical imbalances" in 21 of the 29 low bids but no "material imbalances." The Fairchild bid also contains "mathematical imbalances." It also "front-ends" several items. The total dollar value of the "front-ending" in the Fairchild bid (including roadway mobilization) closely approximates that found in the Hardaway bid and, under the FHWA analysis, would result in approximately the same amount of advance payment. Under Section 101-2.2 of the DOT's Standard Specifications for this project, contractors are limited to a maximum of ten percent of the total contract for mobilization. The Hardaway Company's total mobilization bid is within the maximum under the specifications. Notwithstanding the imbalances in the Hardaway bid, and the so-called "advance payments" that would result from the "front-ending" in the Hardaway bid, the Hardaway bid remains the lowest and best bid on the project, and it is the best interest of the DOT and the public to award the contract to the Hardaway Company. Even if the Hardaway Company had bid the sand fill, shell fill, reinforcement grid, and Class III (seal) concrete items exactly as Fairchild did, Hardaway still would be low bidder. "Value Engineering" and Alleged Alternative or Contingent Bidding. Inferences reasonably could be drawn from the evidence that the Hardaway Company may intend to propose to the DOT that the approach to the bridge be re-engineered so as to eliminate the need for the sand fill, the shell fill, the reinforcement grid and the C III (seal) concrete. If the DOT accepts such a proposal, the contract between the DOT and the Hardaway Company would have to be modified. If the re-engineered project were to allow the Hardaway Company to do the job for less than its bid price, half (or, if the proposal is innovative or unique, up to 80%) of the savings would be paid to the Hardaway Company under what the DOT calls "value engineering." Under DOT procedures, "value engineering" proposals are not made or evaluated until after the original contract is signed with the successful bidder. It is not an alternative bid or a contingent bid.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is recommended that the Respondent, the Department of Transportation, enter a final order dismissing the bid protest filed by W. R. Fairchild Construction Company, Ltd., and awarding State Project No. 46090-3511 to the Hardaway Company. RECOMMENDED this 30th day of July, 1990, in Tallahassee, Florida. J. LAWRENCE JOHNSTON Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 30th day of July, 1990.

Florida Laws (1) 120.57
# 6
TOSHIBA BUSINESS SOLUTIONS (USA), INC., A DELAWARE CORPORATION vs SCHOOL BOARD OF BROWARD COUNTY, 14-005300BID (2014)
Division of Administrative Hearings, Florida Filed:Fort Lauderdale, Florida Nov. 13, 2014 Number: 14-005300BID Latest Update: Aug. 12, 2015

The Issue Whether, in issuing the Revised Recommendation/Tabulation for contracts for Items 1 and 3 for Invitation to Bid No. 15- 048E, Multifunctional Devices, Cost-Per-Copy, Respondent acted contrary to one or more governing statutes, rules, policies, or procurement specifications, or any combination thereof; and if so, for each such instance, whether the misstep was clearly erroneous, arbitrary or capricious, or contrary to competition.

Findings Of Fact On June 3, 2014, SBBC issued ITB No. 15-048E (the ITB) entitled "Multifunctional Devices, Cost-Per-Copy" for the provision and maintenance of copying devices during the contract term. The listed Submittal Requirements were: Manufacturer's Authorization Special Condition 8; Descriptive Literature Special Condition 6; and Material Safety Data Sheets Special Condition 16. A Bidder's Preference Statement was not identified as a Submittal Requirement. Section 4, Paragraph 2, of the ITB was entitled "TERM" and notified bidders that SBBC sought through the award of this bid to "establish a contract for the period beginning from the date of award and continuing through June 30, 2017." The Bid Summary Sheet found at Section 5 of the ITB requested bidders to provide cost-per-copy based on a stated average monthly number of copies, and to extrapolate cost out for 12 months and for 36 months. Page 1 of the ITB contained a certification to be executed by each bidder's authorized representative which stated in pertinent part as follows: Bidder agrees to be bound to any and all specifications, terms and conditions contained in the ITB, and any released Addenda and understand that the following are requirements of this ITB and failure to comply will result in disqualification of bid submitted. All bidders submitted a signed bidder certification. Section 3, Paragraph 1(a), of the General Conditions of the ITB provided as follows: SEALED BID REQUIREMENTS: The "Bidder Acknowledgment Section" must be completed, signed and returned with the bid. The Bid Summary Sheet pages on which the Bidder actually submits a bid, and any pages, upon which information is required to be inserted, must be completed and submitted with the bid. The School Board of Broward County (SBBC) reserves the right to reject any bid that fails to comply with these submittal requirements. BIDDER'S RESPONSIBILITY: It is the responsibility of the Bidder to be certain that all numbered pages of the bid and all attachments thereto are received and all Addendum released are received prior to submitting a bid without regard to how a copy of this ITB was obtained. All bids are subject to the conditions specified herein on the attached bid documents and on any Addenda issued thereto. Section 3, Paragraph 6, of the General Conditions of the ITB provided as follows: AWARDS: In the best interest of SBBC, the Board reserves the right to: 1) withdraw this bid at any time prior to the time and date specified for the bid opening; 2) to reject any or all bids received when there are sound documented business reasons that serve the best interest of SBBC; 3) to accept any item or group of items unless qualified by Bidder; and 4) to acquire additional quantities at prices quoted on this ITB unless additional quantities are not acceptable, in which case, the bid sheets must be noted "BID IS FOR SPECIFIED QUANTITY ONLY." On June 18, 2014, SBBC issued Addendum Number 1 for the ITB which replaced a number of pages within the bidding documents and contained responses to questions posed by prospective bidders. Addendum Number 1 included Question No. 6 in which Xerox inquired whether SBBC "would . . . consider a change to the contract term of the contract to 48 or 60-month term?" SBBC responded through Addendum Number 1 that it had amended the bid "to include additional pricing for 48 or 60-months term[s]," and SBBC continued to request proposals for a 36-month contract term. Addendum Number 1 revised Section 4, Paragraph 2, of the Special Conditions of the ITB to state as follows: TERM: The award of this bid shall establish a contract for the period beginning from the date of award and continuing through an award for a term of 36, 48 or 60 months. Bids will not be considered for a shorter period of time. All prices quoted must be firm throughout the contract period. Items will be ordered on an as needed basis. Addendum Number 1 included an Appendix A–Summary Cost Sheet which required bidders to provide cost-per-copy based on a stated average monthly number of copies, and to extrapolate cost out for 12 months, 36 months, 48 months, and 60 months. On June 20, 2014, SBBC issued Addendum Number 2 for the ITB. The first page of Addendum Number 2 advised prospective bidders, "This Addendum amends the above referenced bid in the following particulars only: 1. DELETE: Appendix A–Cost Summary Sheet INSERT: Revised Appendix A–Cost Summary Sheet." The first page of Addendum Number 2 further cautioned bidders that "[i]t is important to include the REVISED page when submitting your response." Addendum Number 2 went on to provide a Revised- Appendix A-Summary Cost Sheet which stated "A Cost Summary Sheet must be completed for each options [sic] 36 months, 48 months and 60 months" and included a cost summary sheet for each of those three options. The ITB and addenda numbers 1 and 2 were released by SBBC via Onvia DemandStar, with email notices thereof to prospective vendors who subscribed to its bid notification service. Toshiba downloaded the ITB, Addendum Number 1, and at least the first page of Addendum Number 2 from DemandStar prior to the submission of its bid to SBBC. Again, the first page of Addendum Number 2 cautioned bidders that Appendix A–Summary Cost Sheet had been deleted and replaced and that it was "important to include the REVISED page when submitting your response." No bid specifications protest was filed by any person or entity concerning the ITB or addenda numbers 1 or 2. On July 3, 2014, SBBC opened bids timely submitted in response to the ITB by: Toshiba; ImageNet; Innovative; Lexmark International, Inc.; and Ricoh. Konica had also presented a bid to SBBC in the bid opening room prior to the opening of bids but after the announced time for submittal of bids. The Konica bid was delivered to SBBC but was not opened at the time of the bid opening. Toshiba, the incumbent, was the only bidder that violated the pricing requirements of the ITB. The bid submitted by Toshiba utilized the version of Appendix A-Summary Cost Sheet that was released under Addendum Number 1 and only offered cost- per-copy pricing for the 60-month term option. Toshiba's bid did not submit the Revised-Appendix A-Summary Cost Sheet issued under Addendum Number 2, nor did it contain any bids offering cost per copy pricing to SBBC for the 36 or 48-month term options. Although Toshiba's bid was not rejected as non-responsive for failing to bid on the 36 and 48-month term options and for failing to utilize and complete the Revised-Appendix A-Summary Cost Sheet issued under Addendum Number 2, SBBC's staff later concluded in hindsight that it should have been rejected for such non-compliance. Toshiba's bid included a "Pricing" note immediately prior to its Appendix A–Summary Cost Sheet that stated: [Toshiba] is proposing a 60 month CPC as a response to the [ITB]. Based on the fact the [ITB] has no minimum, cancellation for convenience, ability to upgrade and downgrade with no penalty, it is in the best interest of our organization to bid a term of 60 months. This term allows us to provide the most aggressive price to the [SBBC] and maintain the excellent service and support level in place. SBBC's staff recommended that an award be made under the ITB for pricing offered for a 36-month contract term for Items 1, 2, and 3 for a contract period of August 6, 2014, through September 30, 2017. On July 10, 2014, SBBC posted its initial ITB Recommendation/Tabulation which did not consider the Konica bid. The initial posted Recommendation/Tabulation notified bidders of SBBC's intended award of contracts for Items 1 and 2 to ImageNet as the primary awardee and to Innovative as the alternate awardee for a contract period of August 6, 2014, through September 30, 2017, and recommended the award of contracts for Item 3 to Ricoh as primary awardee and to ImageNet as alternate awardee for a contract period of August 6, 2014, through September 30, 2017. Timely bid protests and bid protest bonds were filed by Konica and by Toshiba concerning SBBC's initial Recommendation/Tabulation of July 10, 2014. SBBC's Bid Protest Committee conducted a meeting with the protestors on August 26, 2014, and determined that Konica's bid had been timely submitted and directed SBBC's Procurement and Warehousing Services Department (the Department) to evaluate Konica's bid for responsiveness. It also directed the Department to revise its recommendation on the ITB to reject Toshiba's bid for Item 2 as the device offered by Toshiba for that item did not meet the ITB's specifications which called for a single device capable of performing 95 copies per minute (cpm) and Toshiba instead offered two devices that performed at 85 cpm. After reviewing Konica's bid for responsiveness, SBBC posted a Revised Recommendation/Tabulation for the ITB on August 29, 2014, which (a) recommended award of Item 1 to ImageNet for a term from October 7, 2014, through November 30, 2017, as the primary awardee and to Innovative as the alternate awardee; (b) recommended award of Item 3 to Ricoh for a term from October 7, 2014, through November 30, 2017, as the primary awardee and to ImageNet as the alternate awardee; and (c) recommended the rejection of Toshiba's bid for Item 2 for its failure to meet the specifications for that Item. On September 4, 2014, Toshiba timely filed its notice of intent to protest the August 29, 2014, posted Revised Recommendation/Tabulation. On September 15, 2014, Toshiba timely filed its Amended Formal Petition Protesting Proposed Revised Recommendation/Tabulation. SBBC's Bid Protest Committee conducted a meeting with Toshiba on November 5, 2014, pursuant to section 120.57(3), SBBC Purchasing Policy 3320, and the ITB, and rejected Toshiba's bid protest. On November 10, 2014, Toshiba timely requested that SBBC forward its bid protest to DOAH for a formal hearing. Toshiba has presented a number of arguments in these proceedings seeking to avoid the circumstances Toshiba created for itself when it failed to comply with Addendum Number 2 and violated the ITB's pricing requirements and the ITB's requirement as to the term of the contract to be awarded, when Toshiba only submitted a single bid and restricted the contract term for which it would be considered to 60 months. First, Toshiba attempts to divest SBBC of its express authority to select proposals for any contract duration for which it solicited bids other than for a month term. Second, Toshiba argues that SBBC was somehow obligated to specify within the bid specifications those business considerations that would inform SBBC's selection of the duration of the contract term to be awarded under the ITB. Third, Toshiba argues that ImageNet was non-responsive regarding the ITB's specifications concerning manufacturer's certifications. Toshiba also argues that all bidders, including itself, were non- responsive with regard to the ITB's specifications regarding bidding preference laws. None of the arguments presented by Toshiba in opposition to SBBC's intended award of Items 1 and 3 are persuasive. The Selection of the 36-Month Term SBBC's recommended award for a 36-month contract period from October 7, 2014, through November 30, 2017, is consistent with the terms and conditions of the ITB and its addenda. At the very start of this competitive solicitation, SBBC informed bidders through Section 4, Paragraph 2, of the ITB and the Bid Summary Sheet at Section 5 of the ITB that it was seeking a contract through June 30, 2017-–i.e., a 36-month contract. SBBC also made it clear in its response to Question No. 6 of Addendum Number 1 that "[t]he contract will be for a full 36 months." Although SBBC revised the bid specifications through Addendum Number 1 to allow bidders to submit "additional pricing for 48 and 60 months term[s]," "to allow the School District to consider a 48 and/or 60 months term contract," and revised Section 4, Paragraph 2, of the ITB to provide for "an award for a term of 36, 48 or 60 months," it was clear under the ITB that SBBC contemplated that a 36-month contract could serve its needs. Addendum Number 2 further revised the bid specifications by providing the Revised–Appendix A–Summary Cost Sheet which informed bidders that "a Cost Summary Sheet must be completed for each options [sic] 36 months, 48 months and 60 months." SBBC intended to review the additional pricing offered for 48 and 60- month contract terms to determine whether those particular options were a better business decision for SBBC. Several factors were considered by SBBC in selecting the contract duration for the award under the ITB. The selection of the shorter 36-month contract term was consistent with the expressed terms of the ITB and addenda and the expressed preference of SBBC's governing board to refrain from entering into long-term contracts and enabled SBBC to be flexible in finding solutions to its copying needs and to take advantage of changes that may arise in technology; avoided problems the school district was currently experiencing with a long-term cost-per- copy contract which ranged from equipment performance issues to the long-term placement of technology in schools; and enabled the school district to conduct research to determine whether future implementation of a managed print solution would provide the school district with additional cost savings or financial benefits in contrast to the cost-per-copy services being procured through the ITB. Clearly, this selection was neither arbitrary nor capricious. SBBC's elected governing board has made it known by its actions taken at public meetings that it disfavors long-term contracts for the procurement of goods and services and has gone so far as to reduce the term of contracts from the dais. SBBC's staff determined that the pricing offered to SBBC for a 60-month contract term was not significant enough to recommend a contract longer than the 36-month term SBBC had been requesting since the release of the ITB. Any cost advantages offered by Toshiba's bids for Items 1, 2, and 3 were reduced by $525,000 per year due to the disqualification of its bid for Item 2, which failed to meet the ITB's specifications. Consideration of Managed Print Services Xerox Corporation informed SBBC that a managed print services (MPS) program could save millions of dollars per year and later submitted a no bid response to SBBC regarding the ITB because SBBC was not implementing a MPS program under the ITB. SBBC had also received proposals from vendors in October 2013 concerning a MPS program and concluded that there existed a potential annual savings of millions of dollars if such a program could be implemented. All of which were additional reasonable, rational reasons for SBBC to remain consistent with its decision to award the contracts for a term of 36 months and not something longer. The ITB contains standard terms and conditions which enable SBBC to terminate an awarded contract regardless of reason and with or without cause upon 30 days written notice to the other party. Toshiba wants SBBC to rescue Toshiba from its failure to submit required bids for 36-month and 48-month periods by forcing SBBC to award a contract obligating the agency for a longer duration under the ITB than desired by the agency and then have SBBC terminate the 60-month contract award for convenience after 36 months. SBBC includes termination for convenience provisions within its contracts for goods and services due to section 1011.14, Florida Statutes, which restricts the ability of district school boards to obligate public funds for a period beyond one year. The inclusion of the standard termination for convenience clauses in its ITBs enables SBBC to enter into contracts exceeding one year which affords the school district opportunities to obtain continuity of service and price advantages that would not be available under shorter contracts. While SBBC has the ability under the ITB to terminate contracts for convenience upon 30 days' notice, it rarely does so. SBBC has never exercised its right to terminate its two prior contracts for the services sought under this ITB. Any such termination requires action by SBBC's governing board during a public meeting. SBBC's staff would not engage in the sham of recommending a contract to its governing board for a contract term longer than the period for which it intends to procure services from a vendor. SBBC's procurement staff believes that using the termination for convenience clause in the manner Toshiba recommends can have an adverse effect upon the school district's ability to encourage bidders to participate in its competitive solicitations or to offer it their best pricing. Questions 1 and 59 of Addendum Number 1 of the ITB provide evidence of concern within the bidding marketplace that SBBC might exercise its termination for convenience clauses with regard to the services being procured under the ITB and support the perception of SBBC's that it should avoid a reputation for exercising such termination authority. Toshiba argues that SBBC somehow materially misled bidders through the ITB by stating in response to Question No. 3 concerning MPS of Addendum Number 1 that: The School District is not planning to implement a Managed Print Services at this time. The School District would like to receive Additional information regarding other districts that have implemented a Managed Print Services. There are no evaluation points associated with this ITB. SBBC's responses to Question No. 3 of Addendum Number 1 were accurate and did not mislead bidders. Toshiba is the only bidder to claim to have been misled. Section 6, Paragraph 10, of the ITB requested bidders provide SBBC with information about how the awardee could transition SBBC to a MPS model from the cost-per-copy model being offered under its bid. While SBBC requested such information from vendors within the bidding marketplace, there is no evidence that any bidder's provision or omission of such information within its bid submission was considered in the selection of the recommended awardees. In fact, ImageNet was recommended for award even though it did not provide this ancillary information about transition to a MPS delivery model. Rather, the recommended awardees for a 36-month contract term for Items 1 and 3 were determined solely on the basis of cost submitted for those items by the bidders, all in accordance with the ITB. A MPS program was a possible initiative being considered by SBBC's former Chief Information Officer prior to his departure from SBBC in February 2014, at which time the school district's current cost-per-copy contract was nearing its expiration. Although SBBC still had an interest in the possibility of a MPS program, it was not going in that direction at the time it needed to release a bid for copying services to replace its current expiring contract. Toshiba contends that SBBC was somehow required to disclose to bidders whether the potential future implementation of a MPS program might impact the contract award period that SBBC might choose under the ITB. A myriad of business considerations may inform an agency in selecting the length of its contracts for goods and services, and there is no law or rule that requires an agency to specify those factors within an ITB. Responsiveness of the Bidders Toshiba has attempted to argue that ImageNet, the recommended awardee for Item 1 and the alternate awardee for Item 3, was somehow non-responsive under the ITB and ineligible for award. In support of this argument, Toshiba has referenced Section 4, Paragraph 8, of the Special Conditions of the ITB which state as follows: MANUFACTURER'S CERTIFICATION: Bidder must submit with their ITB a notarized letter from manufacturer certifying that bidder is authorized to sell, service and warrant the multifunctional devices offered within this ITB. Failure of the bidder to provide this letter with their submitted bid or upon request shall result in disqualification of entire bid. If the bidder is the manufacturer, then bidder should state that their company is the manufacturer of the equipment provided in this bid (the letter does not need to be notarized). A bid is only disqualified under Section 4, Paragraph 8, of the ITB if (1) a notarized manufacturer's letter is omitted from the bid; and (2) the bidder fails to comply with a subsequent request from SBBC to provide the letter. No bidder, including Toshiba and ImageNet, included a notarized letter from a manufacturer with its bid. SBBC did not request any of the bidders to submit a notarized manufacturer's letter at any time after the submission of bids. As a result, none of the bids, including that of ImageNet, was non-responsive for a failure to satisfy Paragraph 8 of Section 4 of the ITB. Toshiba has also argued that all bids should be rejected due to Section 3, Paragraph 1(d), of the General Conditions of the ITB which concerns bidders' preference laws and states as follows: d) BIDDING PREFERENCE LAWS: ALL BIDDERS MUST COMPLETE AND SUBMIT THE LEGAL OPINION OF BIDDER'S PREFERENCE FORM IN ORDER TO BE CONSIDERED [sic] FOR AWARD. The State of Florida provides a Bidder's preference for Florida vendors for the purchase of personal property. The local preference is five (5) percent. Bidders outside the State of Florida must have an Attorney, licensed to practice law in the out-of-state jurisdiction, as required by Florida Statute 287.084(2), execute the "Opinion of Out-of-State Bidder's Attorney on Bidding Preferences" form and must submit this form with the submitted bid. Such opinion should permit SBBC's reliance on such attorney's opinion for purposes of complying with Florida Statute 287.084. Florida Bidders must also complete its portion of the form. Failure to submit and execute this form, with the bid, shall result in bid being considered "non-responsive" and bid rejected. No bidder, including Toshiba, included an "Opinion of Out-of-State Bidder's Attorney on Bidding Preferences" form with its bid. Each bidder's omission of that form was for good reason. Section 3, Paragraph 1(d), of the General Conditions of the ITB is a boilerplate provision within SBBC's standard bidding documents that is included pursuant to section 297.084(2), Florida Statutes, for any competitive solicitations in which personal property is to be purchased by SBBC. In instances in which it solicits bids to purchase personal property, SBBC includes a "Bidder's Preference Statement" form and includes that form among the checked "Submittal Requirements" listed in Section 2, Page 1, of the ITB. This ITB did not include a "Bidders Preference Statement" form among the bidding documents or list it as one of the required submittals. The state law and the boilerplate provision at Section 3, Paragraph 1(d), of the General Conditions of the ITB are only applicable to competitive solicitations for the purchase of personal property and do not extend to competitive solicitations for the purchase of services. As Section 4, Paragraph 12, of the Special Conditions of the ITB makes it clear that the multi-functional devices to be provided by the awardee under the ITB will "remain the property of the vendor," the standard bidder's preference provision contained within the ITB is plainly inapplicable to this procurement.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the School Board of Broward County enter a final order that adopts the Findings of Fact and Conclusions of Law contained herein, dismisses the protest filed by Toshiba Business Solutions (USA), Inc., and upholds the awards of contracts under the procurement for a 36-month term from October 7, 2014, through November 30, 2017, to ImageNet Consulting of Miami, Inc., as the primary awardee for Item 1 and to Innovative Software Solution, Inc., as the alternate awardee for Item 1, and to Ricoh USA, Inc., as the primary awardee for Item 3 and to ImageNet Consulting of Miami, Inc., as the alternate awardee for Item 3. DONE AND ENTERED this 15th day of June, 2015, in Tallahassee, Leon County, Florida. S MARY LI CREASY Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 15th day of June, 2015. COPIES FURNISHED: Robert Paul Vignola, Esquire Office of the General Counsel Eleventh Floor 600 Southeast Third Avenue Fort Lauderdale, Florida 33301 (eServed) William G. Salim, Jr., Esquire Moskowitz, Mandell, Salim and Simowitz, P.A. 800 Corporate Drive, Suite 500 Fort Lauderdale, Florida 33334 (eServed) Eric J. Rayman, Esquire Genovese, Joblove and Battista, P.A. PNC Center, Suite 1110 200 East Broward Boulevard Fort Lauderdale, Florida 33301 (eServed) Albert E. Dotson, Esquire Wendy Francois, Esquire Bilzin, Sumberg, Baena, Price and Axelrod, LLP 1450 Brickell Avenue, Suite 2300 Miami, Florida 33131 (eServed) Matthew Mears, General Counsel Department of Education Turlington Building, Suite 1244 325 West Gaines Street Tallahassee, Florida 32399-0400 (eServed) Robert W. Runcie, Superintendent Broward County School Board Tenth Floor 600 Southeast Third Avenue Fort Lauderdale, Florida 33301 (eServed) Pam Stewart Commissioner of Education Department of Education Turlington Building, Suite 1514 325 West Gaines Street Tallahassee, Florida 32399-0400 (eServed)

Florida Laws (6) 1011.14120.53120.569120.57120.68287.084
# 7
MERCEDES LIGHTING AND ELECTRICAL SUPPLY, INC. vs. DEPARTMENT OF GENERAL SERVICES, 88-002211BID (1988)
Division of Administrative Hearings, Florida Number: 88-002211BID Latest Update: Dec. 27, 1988

Findings Of Fact Background On February 23, 1988, Respondent, Department of General Services (Department), issued an invitation to bid (ITB) numbered 218-285-400-6, whereby it sought to establish a 24-month term contract for the purchase of large lamps, photo lamps, and studio, theatre, television, and video lamps by all State of Florida agencies. By April l, 1988, the bid opening date, four bids had been filed with the Department. On April 12, 1988, the bid results were posted by the Department. The bid results revealed that Petitioner, Mercedes Lighting and Electrical Supply, Inc. (Mercedes), was the lowest bidder and that Intervenor, Marpan Supply Company, Inc. (Marpan), was the second lowest bidder. The bid results further revealed that the bid of Mercedes had been rejected because it did not include a list of in-state service representative(s) as required by the ITB, and that the Department proposed to award the contract to Marpan. On April 12, 1988, Mercedes timely filed its notice of protest with the Department. Along with its notice of protest, Mercedes submitted a list of its in-state service representatives, and noted on its letter of transmittal that this list was "not included at time of bid." The bid documents Pertinent to this case, the ITB contained the following special condition: Service Availability of in-state representation to assist in proper application and to resolve technical problems is a requirement of this bid and the resulting contract. Bidders must, therefore, include as part of the bid a list of in-state service representative(s) who will be responsible for providing these services during the term of the proposed contract. Failure to comply with this requirement will result in disqualification of bid. . . . The coordination effort will be handled by the specific individual designated on the ordering instruction sheet. The ITB also contained the following general condition: 7. INTERPRETATIONS/DISPUTES: Any questions concerning conditions and specifications shall be directed in writing to this office for receipt no later than ten (10) days prior to the bid opening. No interpretation shall be considered binding unless provided in writing by the State of Florida in response to requests in full compliance with this provision. Any actual or prospective bidder who disputes the reasonableness, necessity or competitiveness of the terms and conditions of the Invitation to Bid, bid selection or contract award recommendation, shall file such protest in form of a petition in compliance with Rule 13A 1.006, Florida Administrative Code. Failure to file a protest within the time prescribed in Section 120.53(5), Florida Statutes, shall constitute a waiver of proceedings under Chapter 120 Florida Statutes. Mercedes did not protest the bid specifications or conditions within 72 hours after receipt of the ITB, nor did it seek any interpretation of the conditions specifications. Notably, the only protest filed by Mercedes was after the bid opening. The bid protest At hearing, Mercedes contended that its bid complied with the ITB because it included a list of Mercedes' in-state service representative(s) or, alternatively, that its failure to include a list of its in-state representative(s) was a minor irregularity that the Department should waive. 1/ Mercedes contends that its bid included a list of in-state service representatives, and therefore was responsive to the ITB, because of its response to page 11 of the bid package entitled "Ordering Instructions", and because there appeared on the back of the manufacturer's catalogs and price list, submitted with its bid, a Florida sales office for the manufacturer at which sales and technical information could be obtained. Mercedes' contention and the proof offered to support it are not credible. The form included at page 11 of the ITB provided, and was responded to by Mercedes, as follows: ORDERING INSTRUCTIONS NOTE: ALL ORDERS SHOULD BE DIRECTED TO: FEDERAL EMPLOYER IDENTIFICATION NUMBER (FEID) : 59-1891811 VENDOR: Mercedes Lighting and Electrical Supply, Inc. STREET ADDRESS OR P.O. BOX: 7354 SW 48th St. CITY, STATE, ZIP: Miami, Florida 33155 TELEPHONE: (305) 665-5550 TOLL FREE NO: DELIVERY: DELIVERY WILL BE MADE WITHIN SEE PAGE 4 DAYS AFTER RECEIPT OF PURCHASE ORDER. DELIVERIES IN EXCESS OF SEE PAGE 4 DAYS WILL NOT BE CONSIDERED. TEAMS FOR PROMPT PAYMENT; NET percent 30 DAYS PRODUCT INFORMATION; DIRECT INQUIRY TO: (NAME, ADDRESS, AND TELEPHONE NUMBER OR INDIVIDUAL IN YOUR ORGANIZATION WHO MAY BE CONTACTED REGARDING CONTRACT WHICH MAY RESULT FROM THIS BID.) NAME AND TITLE: Victor J. LaPorta, Vice President ADDRESS: 7354 SW 48th St. CITY, STATE, ZIP: Miami, FL. 33155 TELEPHONE: (305) 665-5550 TOLL FREE NO.: Mercedes did not indicate in its response to the "Ordering Instructions" form that Mr. LaPorta was its in-state service representative, and its response could not reasonably be so construed. The individual a bidder designated on this form was, pursuant to the special condition of the ITB regarding "Service", the coordinator between a purchaser and the in-state service representative. Mercedes' contention that its bid included a list of its in-state service representatives, because the manufacturer's technical catalogs and price list submitted with its bid contained the location and phone number of the manufacturer's sales office in Florida, in addition to 23 other states, is incredible. The manufacture's technical literature and price list was, pursuant to the special conditions of the ITB, a required part of the bid. While the manufacturer may have listed its sales offices on the back of its literature, there is nothing in Mercedes' bid that remotely suggests it intended that listing to be considered its list of in-state service representatives, nor could its response reasonably be so construed. In rejecting Mercedes' contention that its bid was responsive to the ITB, and rejecting its proof as inherently improbable and unworthy of belief, I note that the Department has issued similar ITB's for a number of years. But for the language in this ITB advising bidders that failure to include a list of in-state service representatives would result in disqualification of the bid, the service provision has remained essentially the same, as has the "Ordering Instructions" form and the requirement that the manufacturer's technical literature and price list be included in the bid. When this same contract was let two years ago, Mercedes was a bidder. Included within its response to that ITB was a list of its in-state service representatives. A minor irregularity? While Mercedes did not protest the terms and conditions of the bid within 72 hours of receipt of the ITB, it offered proof at hearing which tended to demonstrate that the demand for technical assistance under the state contract was not frequent. Based on this premise, Mercedes contended that its failure to include a list of in-state service representatives with its bid was a minor irregularity that should be waived by the Department. Again, Mercedes' contentions are not persuasive. Whether the demand for technical assistance is frequent or infrequent may be germane to a timely challenge to the propriety of the ITB requirement that a list of in-state service representative included in the bid. However, where, as here, the bidder did not protest such condition in a timely manner, it has waived its right to a Chapter 120 proceeding to contest its propriety. Under such circumstances, the protest is limited to whether the failure to include such a list was a minor irregularity, and the frequency of demand for technical assistance is not relevant. 2/ Minor irregularity is defined by Rule 13A-1.002(10), Florida Administrative Code, as: ...a variation from the invitation to bid... which does not affect the price of the bid..., or give the bidder... an advantage or benefit not enjoyed by other bidders..., or does not adversely impact the interests of the agency. Variations which are not minor can not be waived. The ITB mandated that failure to include a list of in-state service representatives with the bid would result in the bid's disqualification. Under such circumstances, Mercedes cannot be permitted to correct the deficiency after bid opening, and the deficiency cannot be deemed minor, because it would accord Mercedes an advantage not enjoyed by other bidders. Succinctly, Mercedes could revisit its bid on bid opening, refuse to supply the required list, and thereby effectively disqualify itself and withdraw its bid. The other bidders who timely submitted their lists would not have an opportunity to revisit their bids or withdraw their bids, but would be held to the provision of the ITB that prohibited such withdrawal for 90 days after bid opening. A frivolous protest Mercedes' protest was frivolous. It presented no justifiable question for resolution, and was without basis In fact or in law. Mercedes knew when it submitted its bid that a list of in-state service representatives was required. It simply forgot to include that list. When this oversight was disclosed at bid opening, it tried to supplement its bid. This effort, for the reasons set forth in the conclusions of law, was ineffective. Now, Mercedes would have the hearing officer believe that it intended its response to the "Ordering Instructions" form, as well as the manufacturer's technical literature and price list included in the bid, as its list of in-state service representatives. Such proof is not credible, such was not Mercedes' intent, and its response cannot reasonably be so construed. Mercedes' contention that its failure to include such list should be waived as a minor irregularity is likewise factually and legally without merit. See Saxon Business Products, Inc. v. Department of General Services, 4 FALR 1102-A (1982), wherein this issue was previously resolved adverse to the position advocated by Mercedes. The impact of the protest The current term contract for lamps expires June 9, 1988. Upon expiration of that contract, state agencies will not be accorded the savings generated by a term contract and will be required to competitively bid any lamp purchase over $3,000. Had Mercedes not protested the Marpan award, state agencies would have enjoyed continued savings under a term contract that would have provided them prices 50 percent lower than could be obtained through individual agency bids.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that a final order be entered dismissing the formal protest filed by Mercedes Lighting and Electrical Supply, Inc. DONE AND ENTERED In Tallahassee, Leon County, Florida, this 3rd day of June, 1988. WILLIAM J. KENDRICK Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1050 Filed with the Clerk of the Division of Administrative Hearings this 3rd day of June, 1988.

Florida Laws (5) 120.53120.57120.68562.5076.25
# 8
PRE-CAST SPECIALTIES, INC. vs PALM BEACH COUNTY SCHOOL BOARD, 91-002957BID (1991)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida May 13, 1991 Number: 91-002957BID Latest Update: Jun. 24, 1991

The Issue Whether Respondent should sustain Petitioner's challenge to the preliminary determination to reject Petitioner's bid as not responsive to Respondent's Invitation to Bid No. SB 91C-284V and to award the contract to another bidder that submitted a higher bid?

Findings Of Fact Based on the record evidence, the following Findings of Fact are made: On March 12, 1991, Respondent issued Invitation to Bid No. SB 91C-284V (hereinafter referred to as the "ITB") through which Respondent solicited the submission of bids to supply Respondent with prestressed concrete poles for a one year period beginning May 16, 1991. The ITB was a multi-page document with various component parts. Bidders were instructed on the first page of the ITB to complete and "RETURN ONE COPY OF ALL BID SHEETS AND THIS [BIDDER ACKNOWLEDGMENT] FORM." They were advised elsewhere on the first page of the ITB that "[o]ne copy of all bid documents that ha[d] page numbers, and this executed Invitation to Bid [Bidder Acknowledgment] [F]orm [had to] be returned for the Bid to be considered." The advisement concerning the requirement that all numbered pages had to be returned for a bid to be considered was repeated at the bottom of each numbered page of the ITB. Directly beneath the Bidder Acknowledgment Form on the first page of the ITB was the following provision: This Invitation to Bid, General Conditions, Instructions to Bidders, Special Conditions, Specifications, Addenda and/or any other pertinent document form a part of this proposal and by reference are made a part thereof. The ITB further provided, among other things, that "[i]n the best interest of [Respondent], [Respondent] reserve[d] the right to reject any and all bids and to waive any irregularity in bids received." Petitioner and South Eastern Prestressed Concrete, Inc. (South Eastern) submitted the only bids in response to the ITB. In accordance with the ITB'S instructions, Petitioner completed and returned to Respondent the Bid Summary Sheet, on which it indicated its price offer. It also completed and executed the Bidder Acknowledgment Form and returned it, along with the entire first page of the ITB, to Respondent. Petitioner, however, failed to return, as part of its bid submittal, all of the numbered pages of the ITB. Omitted from Petitioner's submittal were numbered pages 3 and 4. These missing pages contained paragraphs A. through N. of the ITB's Special Conditions, which covered the following subjects: A. Scope; B. Delivery; C. Award; D. Term of Contract; E. Brand Name; F. Catalog Cuts; G. Estimated Quantities; H. Bid Exempt; I. Bidders Responsibility; J. Corrections; K. Joint Bidding, Cooperative Purchasing Agreement; L. Withdrawal; 1/ M. Minority Certification Application; and N. Public Entity Crimes. There was nothing on numbered pages 3 and 4 of the ITB that the bidder needed to fill out or sign. While paragraphs M. and N. of the ITB's Special Conditions did make reference to certain forms that the bidder had to complete and submit to Respondent, these forms did not appear on either numbered page 3 or numbered page 4. They were separate documents. Petitioner completed these forms and submitted them to Respondent pursuant to the requirements of the Special Conditions. Petitioner did not propose in its bid submittal any contract terms or conditions that were at variance with those set forth in paragraphs A. through N. of the ITB's Special Conditions. Petitioner did not intend to signify, by failing to return numbered pages 3 and 4, any unwillingness on its part to adhere to contract terms and conditions set forth on those pages. Of the two bids submitted in response to the ITB, Petitioner's was the lowest. A preliminary determination, though, was made to reject Petitioner's bid because Petitioner had not returned numbered pages 3 and 4 of the ITB and to award the contract to South Eastern as the lowest responsive bidder. It is this preliminary determination that is the subject of the instant bid protest filed by Petitioner.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is hereby RECOMMENDED that the Palm Beach County School Board enter a final order sustaining the instant bid protest and awarding to Petitioner the contract advertised in Invitation to Bid No. SB 91C-284V. DONE AND ENTERED in Tallahassee, Leon County, Florida, this 24th day of June, 1991. STUART M. LERNER Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 24th day of June, 1991.

Florida Administrative Code (1) 6A-1.012
# 9
PADDOCK CONSTRUCTION CO., INC. vs CITY OF EUSTIS AND WELLER POOL, 90-003888BID (1990)
Division of Administrative Hearings, Florida Filed:Ocala, Florida Jun. 27, 1990 Number: 90-003888BID Latest Update: Jul. 18, 1990

The Issue The issue in this case is whether the bid protest of Petitioner should be sustained.

Findings Of Fact Respondent owns and operates a city pool known as the George A. Pierce Swimming Pool at the Ferran Park complex in Eustis. The pool is nearly 40 years old and is in need of renovations and repairs. Deciding to renovate the old pool and build a new one next to it, Respondent obtained plans for the intended work from Project Engineering. These plans, which are dated January 31, 1990, consist of seven pages of blue-line drawings of the site, the existing pool, a new training pool, and various details, such as gutters (Blue Drawings). The Blue Drawings formed the basis of a request for proposals that Respondent issued at some point prior to the events at issue in the present case. The offers submitted in response to the request for proposals were unsuitable because they exceeded the money that Respondent had available for the job. At this point, employees of Petitioner learned that Respondent was seeking to repair and renovate the pool. Bill West, who is responsible for sales for Petitioner, visited with Norma Showley, who is in charge of purchasing for Respondent. She showed him the Blue Drawings and informed him that the proposals that had been submitted were double the budget. Mr. West agreed, at no charge, to prepare a new set of drawings for Respondent. Ms. Showley did not agree that Petitioner's drawings would necessarily be incorporated into a new request for proposals or invitation to bid. However, Ms. Showley explained that time was critical, and she needed his drawings in a hurry. She gave Mr. West the original set of Blue Drawings for his company to use in preparing the new drawings. Mr. West asked Jack Arthur to prepare the new drawings. Mr. Arthur does estimates and drawings for Petitioner and is a registered professional engineer licensed to practice in Florida and several other states. He is also a Florida-licensed commercial pool contractor. Mr. Arthur met with Ms. Showley a few days prior to March 12, 1990. Also attending this meeting was Harvey Spears, who, although not an employee of Respondent, assisted Ms. Showley on this project. Apparently, Mr. Spears was the contractor in charge of other work in the pool area, such as the construction of a bathhouse. Working 40-50 hours over the next three days, Mr. Arthur finished the plans, which bear the date of March 12, 1990 (Black and White Drawings). Mr. West then delivered the plans to Ms. Showley. Ms. Showley discussed with the City Comission the possibility of using the Black and White Drawings instead of the Blue Drawings as the basis of a new bid solicitation. The Commission directed her not to abandon the specifications contained in the Blue Drawings, but revise them as appropriate. No decision was ever made to use the Black and White Drawings, except for the purposes expressly indicated in the later-issued invitation to bid, such as to indicate the location of the bathhouse relative to the existing pool and the details of an alternate gutter system. On April 13, 1990, Respondent issued an invitation to bid, which was identified as Bid NO. 026-90. The invitation to bid was accompanied by the Blue Drawings and the Black and White Drawings. The text, Blue Drawings, and Black and White Drawings are collectively referred to as the "ITB." Each of the pages of the Black and White Drawings were marked "Attachment `A,' `B,' `C,' or `D."' The ITB required that the bids, which had to be sealed, were to be delivered to a certain place, where they would be opened at a specified time on May 14, 1990. The ITB provided for a "bid evaluation period" of up to 30 days after opening. Other relevant provisions in the unlabelled introductory section of the ITB include: ACCEPTABLE FORMAT--Bid format provided by "the City is the only acceptable format on which a bidder may return his bid. Bids submitted, on any other format shall be disqualified. (Any additional information relative to the bid, should be submitted on a separate format.) * * * CLARIFICATION/CORRECTION OF BID ENTRY--The City of Eustis reserves the right to allow for the clarification of questionable entries and for the correction of obvious mistakes. ADDITIONAL TERMS AND CONDITIONS--The City of Eustis reserves the right to reject bids containing any additional terms or conditions not specifically requested in the bid/proposal solicitation. * * * AWARD--This bid may be awarded in part or whole as best serves the interest of the City. All awards made as a result of this bid shall conform to all applicable ordinances of the City of Eustis. RESERVATION--The City of Eustis reserves the right to accept any bid which in its opinion best serves the interest of the City, and/or to reject any or all bids or any part thereof, to make awards by individual items, groups of items, or a combination thereof, or to waive minor technicalities or informalities in bids received. * * * For information regarding bid specification, contact Norma M. Showley, General Services, Coordinator [telephone number provided in ITB]. The Scope section of the ITB provides that this is a bid to provide all labor, materials, equipment, supplies and incidental necessary for the performance of all work required for the proper and professional renovation of the existing City Pool with an additive alternate for addition of a . . . training pool . . . The following are suggested methods of renovating the existing pool and constructing the new pool. Plans that differ will be considered for award if determined to be in the best interest of the City. The Scope section explains that the existing pool was built in 1951 and is a "poured-in place pool . . . with no flood inlets." This part of the ITB also informs the bidder that separate contracts have been executed for the construction of a new bathhouse, including a new chemical and filter room, and the work may be performed concurrently with the renovation of the existing pool. The bathhouse layout is shown on Attachment "A". NOTE: Funding for this project is from sales surtax which must be used for construction purposes and must be fully expended before the end of October, 1990. The Scope section continues with a description of the base bid and alternates. The alternates are provided "[d]ue to the time restraint involved with the funding for this project" and Respondent's desire to complete the project quickly. The Scope section of the ITB states that the base bid for the renovation of the existing pool includes replacement of the filtering system with a D.E. filter system, replacement of the circulation system, replacement of the existing guttering system with a one foot open face overflow gutter, replacement of the Marcite on the walls, and addition of underwater lighting "as per plans prepared by Project Engineering (i.e., the Blue Drawings). Additive Alternate 1 eliminates the overflow gutter system and adds a stainless steel facing overflow system as shown on Attachment "B." Additive Alternate B eliminates the recirculating system shown in the Blue Drawings and provides for a proprietary system manufactured by Petitioner. Additive Alternate 3 eliminates the D.E. filter system, as shown in the Blue Drawings, and adds a high rate vacuum sand filter system. Deductive Alternate 1 eliminates the underwater lighting. The Scope section of the ITB describes the base bid for the new pool, which in fact is not an additive alternate, as located west of the existing pool and having a D.E. filter system and underwater lighting. Additive Alternate 1 eliminates the D.E. filter system and adds a pressure sand filter system. Deductive Alternate 1 eliminates underwater lighting. The next section of the ITB is the Instructions to Bidders. Among the provisions listed under the "Submittals" subsection are: License--Bidders shall submit with the bid response a copy of their license from the State of Florida Construction Industry Licensing Board. * * * Bidder Qualification-- * * * References shall be furnished with bid response Other relevant subsections of the Instructions to Bidders section of the ITB provide: Visit to Site--The bidder/contractor shall visit the site of the work to become fully informed as to the conditions that exist and under which he/she must work, and by bidding, represents that he/she has read and understands the bid documents. * * * Evaluation and Award--Bids will be evaluated on the basis of cost, bidder's ability to perform, previous experience, experience of personnel and required completion time. It is the City's intent to award a contract to the lowest responsive bidder. However, the City of Eustis reserves the right to accept any bid which in its opinion best serves the interest of the City, and/or to reject any or all bids or any part thereof, to make awards by individual items, groups of items, or a combination thereof, or to waive technicalities or informalities in bids received. NOTE: Funding for this project is from sales surtax which must be used for construction purposes and must be fully expended before the end of October, 1990. Negotiation of Contract--If deemed in the best interest of the City, the City may, either before or after receipt of bids, select one or more persons or companies and negotiate a contract for the proposed work. The decision of the City as to the firm or firms with whom the City will negotiate will be final. During the negotiations, the right is also reserved to change the plans and specifications as the City may at that time determine to be in the best interest of the City. The section of the ITB devoted to Requirements and Specifications restates the base bids and alternates set forth above in the Scope section. Under the subsection entitled, "Work and Products Not Included," the ITB lists, among other items, "Concrete decking--bleacher area, bathhouse area." Under the subsection entitled, "Description of Work--Existing Pool," the ITB includes the demolition necessary to remove the existing overflow system, install a new one, and provide a recirculation system. Under a similar subsection for the new pool the ITB provides: Provide decking around new pool to match height of existing decking, 4" thickness, 3000 psi concrete, as shown on attachment showing pool layout. Decking shall slope three inches (3") in ten feet (10') away from pool or to deck drains. Minimum unobstructed deck width shall befour [sic] feet (4'). This subsection also refers the bidder to the Black and White Drawings for the curing of the floor of the new pool. For the renovation of the existing pool, the bid form contains blanks for the bidder to include prices for the base bid, three additive alternates, and one deductive alternate. For the construction of the new pool, the bid form contains blanks for the bidder to include prices for the base bid, one additive alternate, and one deductive alternate. Two bid addenda were issued. The first concerned additive alternate 3 for the existing pool and additive alternate 1 for the new pool. This addendum adds, respectively, a vacuum sand filter (instead of a high rate vacuum sand filter) and a high rate pressure sand filter system (instead of a pressure sand filter system). The second addendum, which was accompanied by "a new bid form for prices, adds an automatic water level sensor unit, as described in the Black and White Drawings, to the base bids for the existing and new pools. For the existing pool, the addendum added alternate 4, which replaces the existing main drain with a stainless steel drain, as described in the Black and White Drawings. The Blue Drawings contain four special notes and ten general notes. The first special note is that the final location of "pool and configuration of deck to be determined by architect." The first general note is that the bathroom floors, pool deck, and first 15 feet of connecting walkway are to be concrete or other impervious material, positively drained, and slip resistant. Three unrelated items are noted in red handwriting to be "in bathhouse contract," and one unrelated item is similarly noted to be "by City." Notes on the Black and White Drawings indicate that the contract does not include pool decking around the new pool and a retaining wall beside the new pool, which is in close proximity to a lake. The new pool clearly has to be built to the elevation of the existing pool because, among other reasons, the lake contributes to a high water table in the area of the pool. In order to achieve this elevation, the construction of the decking around the new pool would require either a retaining wall (with some fill) or a larger amount of fill sloped down to the ground level. Due to the close proximity of the lake, it is not entirely clear that the latter approach would work. Even though Mr. Arthur detected inconsistencies between the Black and White Plans and the remainder of the ITB, neither he, Mr. West, nor any other representative of Petitioner contacted Ms. Showley regarding the decking and retaining wall. Following the issuance of the ITB but before the submission of bids, Mr. West met with Ms. Showley, but the conversation involved only the replacement of the main drain and installation of the automatic water level sensor unit. Ms. Showley covered these matters by the addenda described above. They also discussed the possibility of alternate bids with one based exclusively on the Blue Drawings and one based exclusively on the Black and White Drawings. However, Ms. Showley's ability to deviate significantly from the specifications depicted in the Blue Drawings was limited by the lack of time and the earlier directive of the City Commission to revise, rather than abandon, the specifications in the Blue Drawings. Ultimately, timely bids were submitted by only Petitioner and Intervenor, ignoring one or two "no-bid" bids. Petitioner's base bid for the existing pool was $92,399. Additive alternate 1 added $22,897. Additive alternate 2 added $12,383. Additive alternate 3 added $18,500. Additive alternate 4, which was the replacement of the main drain, was included in the base bid and all alternates, even though the only alternate specifying that the main drain be replaced was Additive alternate In fact and as evident from the bid, Petitioner would not perform the job without replacing the main drain due to concerns about the durability of the existing main drain. Deductive alternate 1 subtracted $2500. For the new pool, the base bid was $38,389. Additive alternate 1 subtracted $3103. Deductive alternate 1 subtracted $798. Intervenor's base bid for the existing pool was $107,170. Additive alternate 1 was not bid. Additive alternate 2 added $25,601. The bid was apparently incorrectly filled out. Additive alternate 2, which was the proprietary system manufactured by Petitioner, in fact was not bid, and Additive alternate 1 was bid. Additive alternate 3 added $22 927. Additive alternate 4, which called for the replacement of the main drain, added $5340, but Intervenor noted on its bid form that it did not recommend this alternative. Deductive alternate 1 subtracted $3444. Intervenor's based bid for the new pool was $50,472. Additive alternate 1 was not bid. Deductive alternate 1 subtracted $920. Intervenor also bid three "Voluntary alternates." These alternates, which were not requested in the ITB, involved variations on equipment for the existing pool. Voluntary alternate 2, which totalled $143,253, included a full stainless steel gutter with grating and a high rate pressure sand filter with automatic backwashing feature. Petitioner's base bid for both pools was $130,788. Intervenor's base bid for both pools was $157,642. Intervenor's base bid for both pools, using Voluntary alternate 2, was $193,725. Both bid packages disclosed obvious problems. Petitioner had not bid on any decking or the retaining wall and fill. Ms. Showley and Mr. Spears called Mr. West and, after confirming these omissions, asked for a price. The additional labor and materials added $13,526 for the decking and fill, but apparently not the retaining wall as the slope approach would be used around the new pool. This would have raised Petitioner's base bid to $144,314. However, Petitioner still did not address the issue of the replacement of the main drain. Based on advice from Mr. Spears, Respondent did not want to replace the main drain. The process would require cutting the bottom of the pool. Due to the pool's location, age, and type (poured-in), Mr. spears felt, and Respondent agreed, that the main drain should not be disturbed. Intervenor's bid did not include a copy of its contractor's license or references. Ms. Showley obtained this information after the bid opening. She and Mr. Spears also spoke with Harold von Weller, owner and president of Intervenor, concerning the filtration and gutter systems described in Voluntary alternate 1 and where they had been used. In response to a question concerning the 2 approximate cost of the retaining wall and decking, for the purpose of making a deduction that would facilitate comparison with Petitioner's bid, Mr. Weller wrote a letter estimating the cost of these items as $7004.43. An informal committee consisting of Mr. Spears, Ms. Showley, the architect for the bathhouse, and the City Manager, Michael G. Steerman, considered the bids and determined, after consulting with staff, that Petitioner's bid was not responsive. The City Commission met on May 17, 1990, to award a contract for the renovation and construction of the pools. Mr. Steerman recommended that Respondent reject Petitioner's bid as nonresponsive and award the contract to Intervenor on its Voluntary alternate 2 bid for the existing pool and its base bid for the new pool less the Deductive alternate 1. The amount of $189,361 was derived by subtracting from the Voluntary alternate 2 amount of $143,253 the sum of $3444 for Deductive alternate 1, for a net amount of $139,809 for the existing pool. The new pool net of $49,552 thus generated a total figure of $189,361. It is not entirely clear whether Respondent viewed any of Intervenor's bids as responsive. Most likely, it was assumed by staff and the City Commission that the base bid and possibly the Voluntary alternate 2 bid were responsive. Petitioner and Intervenor are responsible bidders. They are highly qualified and experienced in the construction of commercial pools.

Recommendation Based on the foregoing, it is hereby RECOMMENDED that the City of Eustis enter a final order dismissing the bid protest of Petitioner. ENTERED this 18th day of July, 1990, in Tallahassee, Florida. ROBERT D. MEALE Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 Filed with the Clerk of the Division of Administrative Hearings this 18th day of July, 1990.

Florida Laws (3) 120.53120.57120.65
# 10