TALLAHASSEE MEMORIAL HEALTHCARE, INC., D/B/A TALLAHASSEE MEMORIAL HOSPITAL vs AGENCY FOR HEALTH CARE ADMINISTRATION AND BAY HOSPITAL, INC., D/B/A GULF COAST MEDICAL CENTER, 11-003643CON (2011)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Jul. 22, 2011 Number: 11-003643CON Latest Update: Nov. 21, 2011

Conclusions THIS CAUSE comes before the AGENCY FOR HEALTH CARE ADMINISTRATION (the "Agency”) concerning the Certificate of Need (“CON”) 10111 Application which was filed by BAY HOSPITAL, INC. d/b/a GULF COAST MEDICAL CENTER (hereinafter “Gulf Coast”) to establish a 6- bed Level III NICU in Bay County, Florida. The Agency preliminarily approved Gulf Coast’s application. On July 14, 2011, Tallahassee Memorial Healthcare, Inc. d/b/a Tallahassee Memorial Hospital (hereinafter “TMH) filed a Petition for Administrative Hearing challenging the Agency’s approval. This petition was forwarded to the Division of Administrative Hearings (‘DOAH”), by the Agency and assigned to an Administrative Law Judge. Filed November 21, 2011 9:11 AM Division of Administrative Hearings A 9 Ae 253 On October 27, 2011, the parties entered into a settlement agreement and a Joint Motion to Relinquish Jurisdiction was filed. On October 28, 2011, the Department of Administrative Hearings (hereinafter “DOAH”) issued an Order Relinquishing Jurisdiction and Closing the File. Prior to Final Hearing, the parties entered into a Settlement Agreement (Exhibit 1) which is attached hereto, and the Agency being otherwise well advised in the premises: It is ORDERED AND ADJUDGED: 1. The attached Settlement Agreement is approved and adopted as part of this Final Order, and the parties are directed to comply with the terms of the Settlement Agreement. 2. | The Agency shall issue CON 10111 to Gulf Coast. 3. The Parties shall abide by the terms and conditions of the Settlement Agreement. 4. Each Party shall be responsible for its respective own costs and attorney’s fees. 5. | The above-styled case is hereby closed. DONE and ORDERED this _/4/ day of Nive-d- , 2011, in Tallahassee, Florida. oo 2

# 2
HANCOCK BRIDGE MARINA, LLC. vs FLORIDA FISH AND WILDLIFE CONSERVATION COMMISSION AND DEPARTMENT OF ENVIRONMENTAL PROTECTION, 08-003984 (2008)
Division of Administrative Hearings, Florida Filed:Fort Myers, Florida Aug. 18, 2008 Number: 08-003984 Latest Update: Aug. 13, 2009

The Issue The issue is whether an application by Petitioner, Hancock Bridge Marina, LLC (Petitioner or Hancock), for an Environmental Resource Permit (ERP) and sovereign submerged lands lease to expand an existing docking facility on Hancock Creek near the Caloosahatchee River in unincorporated Lee County (County), Florida, should be approved.

Findings Of Fact Based on the evidence presented by the parties, the following findings of fact are made: Background Hancock is a limited liability corporation with two shareholders: Donald Epler and Stefen Heinke. After conducting a feasibility study, on April 26, 2004, Hancock purchased a 5.51-acre parcel of property in the County with the expectation of constructing and operating a 400-slip marina and a 5,000- square-foot building housing a restaurant, ship's store, and other sundry items needed for operation. (Hancock has subsequently revised its plan by reducing the number of slips requested from 400 to 352.) The cost of the property was around $2.5 million. The property is located in an unincorporated part of the County on the north side of the Caloosahatchee River (River), a Class III water, south of Hancock Bridge Parkway, east of the City of Cape Coral, and west of U.S. Highway 41 and the City of North Fort Myers. The property currently contains a 30-wet slip marina with 13 finger piers and a 4-slip T-dock. The remainder of the parcel is essentially vacant. The parcel borders a River tributary named Hancock Creek, which is a man- altered tidal creek branching off of the River in a northwestern direction, and the North Key Canal, which extends east from Hancock Creek for approximately one-half mile. Access to the River, which is no more than a hundred yards or so south of the parcel, is by traversing North Key Canal and Hancock Creek. The Department is the state agency with the authority under Part IV of Chapter 373, Florida Statutes, to issue an ERP. In addition, the Department has authority from the Board of Trustees of the Internal Improvement Trust Fund to review and take final agency action on requests to authorize activities in sovereign submerged lands. See § 253.002(1), Fla. Stat. The Commission is the agency with constitutional regulatory authority over "wild animal life and fresh water aquatic life and shall also exercise regulatory and executive powers of the state with respect to marine life." See Art. IV, § 9, Fla. Const. The Commission's authority for the regulation of manatees is derived from the Florida Manatee Sanctuary Act, which is codified in Section 379.2431, Florida Statutes. Under Sections 373.428 and 380.23, Florida Statutes, it also has authority to review ERP applications for federal consistency purposes pursuant to the federally approved Florida Coastal Management Program. On September 12, 2005, Petitioner filed an application for an ERP (a regulatory approval) and a lease to use sovereign submerged lands (a proprietary approval) with the Department's South District Office in Fort Myers, Florida. (For unknown reasons, the application was resubmitted to the Department on August 14, 2006.) The two requests are linked, and the Department cannot approve one without approving the other. See Fla. Admin. Code R. 62-343.075(2). The application seeks authority to expand in two phases the existing 30-slip facility. The first phase would generally authorize the construction of a 198-slip upland dry storage facility and reconfiguration of the existing docks. In phase 2, Hancock would add 154 dry slips and construct a 5,000-square-foot marina building. Because the docks are constructed on and over sovereign submerged lands, a proprietary authorization is necessary. Before making a decision on the application, the Department forwarded a copy to the Commission for its recommendation. After receiving the Commission's comments, which consist of 89 pages, including transmittal letters, on December 10, 2007, the Department issued its Notice of Intent to deny the ERP and proprietary authorization on the grounds the project area is sited in an area of very high level of manatee use and the project will increase local boat traffic, resulting in significant adverse effects on the manatee, which is listed by the state and federal governments as an endangered species. A more detailed description of the reasons for denial is found in the Notice of Intent. See Petitioner's Exhibit 6, pages 4 through 9; Department's Exhibit 1.b., pages 4 through 9. The Department acknowledges that its decision was based wholly upon the Commission's determination that the project, as proposed, would have an adverse impact on manatees. The DRI and Estoppel In its Petition, Hancock contends that the Department is "estopped to deny a permit for Phase 1 of the marina in light of its acquiescence to the approval of DRI 2-8990-99." By way of background, in 1990, Hancock's predecessor in interest (Waterway Group, Inc.) applied with the County for a DRI which included, among other things, 400 dry boat spaces on the property. DRI 2-8990-99 was approved by the County on July 8, 1991, and has been amended three times. See Petitioner's Exhibit 3. The original terms of approval contained several conditions that specifically addressed manatee protection. One separated the project into two phases of 200 spaces, the first of which was authorized without additional studies, while the second was subject to additional study and review by the Florida Department of Natural Resources (DNR). When the DRI was approved, the State's manatee protection program was under the jurisdiction of the DNR. That agency reviewed the DRI and recommended manatee protection conditions. The conditions in the final approval were consistent with the program's recommendation. On June 29, 2004, the County adopted a resolution approving a MPP for the County. See Petitioner's Exhibit 4. It was not adopted as an ordinance, and individual notice was not provided to interested property owners, including Hancock's principals. After adoption, the County incorporated the MPP into its Comprehensive Plan. The MPP is a planning document that provides a comprehensive review of manatee and boating data on a county-wide basis. It is developed, reviewed, and approved by local, state, and federal governments and is used for guidance when considering appropriate levels of slip densities within a county. The County is one of thirteen counties directed to adopt a MPP. On October 20, 2004, Hancock filed with the County an application to amend its DRI. The application included requests to extend the DRI approval a third time and to revise the site plan. The site plan changes included a reduction in the total number of dry spaces from 400 to 352. On June 20, 2005, the County approved the DRI amendment. The Development Order included a finding of fact that the marina was exempt from the requirements of the MPP because Section 8.4 of the MPP "exempts existing projects with valid permits and Chapter 380 vested status for the construction of slips (wet or dry) that have not been constructed at the time the MPP was adopted by the Board of County Commissioners." See Petitioner's Exhibit 3, Third Development Order Amendment for Hancock Bridge Marina, page 4, paragraph H. Hancock then filed the instant application on September 12, 2005. To date, Hancock has expended $1,731,000.00 in its permitting efforts, including the DRI extension and ERP application. There is no evidence that during the DRI process, the Department or Commission made any representations to Hancock about its ability to obtain an ERP or sovereign submerged lands authorization. Also, neither agency was consulted during that period of time, presumably because the DRI and ERP processes are separate and independent of one another. Permitting Criteria Section 373.414, Florida Statutes, contains the standards and criteria governing the approval of an ERP. Subsection (1) requires that the applicant provide reasonable assurance that the regulated activity is "not contrary to the public interest." In determining whether this test is met, paragraph (1)(a) requires that the Department consider and balance the following criteria: Whether the activity will adversely affect the public health, safety, or welfare or the property of others; Whether the activity will adversely affect the conservation of fish and wildlife, including endangered or threatened species, or their habitats; Whether the activity will adversely affect navigation or the flow of water or cause harmful erosion or shoaling; Whether the activity will adversely affect the fishing or recreational values or marine productivity in the vicinity of the activity; Whether the activity will be of a temporary or permanent nature. Whether the activity will adversely affect or will enhance significant historical and archaeological resources under the provisions of s. 267.061; and The current condition and relative value of functions being performed by areas affected by the proposed activity. These same factors are found in Florida Administrative Code Rule 40E-4.302, an ERP rule adopted by the South Florida Water Management District. This rule has been adopted by reference by the Department to be used when it considers ERP applications within the geographical jurisdiction of that water management district. See Fla. Admin. Code R. 62-330.200(4). An additional requirement in the rule is that an applicant give reasonable assurance that the project will not cause unacceptable cumulative impacts. See Fla. Admin. Code R. 40E- 4.302(1)(b). Besides the foregoing requirements, additional conditions for the issuance of an ERP are found in Florida Administrative Code Rule 40E-4.301, also adopted by reference by the Department. Relevant here are requirements that the applicant give reasonable assurances that the proposed activity (a) will not adversely impact the value of functions provided to fish and wildlife and listed species by wetlands and other surface waters, and (b) will not cause adverse secondary impacts to the water resources. See Fla. Admin. Code R. 40E-4.301(1)(d) and (f). Section 373.414(1)(b), Florida Statutes, provides that if an applicant is unable to meet the above criteria, the Department shall consider measures proposed by or acceptable to the applicant to mitigate adverse effects that may be caused by the regulated activity. In this case, mitigation measures have been proposed by Hancock and are discussed below. Finally, Section 373.4132, Florida Statutes, requires that the Department evaluate applications for dry storage facilities for ten or more vessels in the same manner as any other ERP application, including that the applicant demonstrate that the facility will not be harmful to the water resources, provides reasonable assurance that the secondary impacts from the facility will not cause adverse impacts to the functions of the wetlands and surface waters, and meets the public interest test in Section 373.414(1)(a), Florida Statutes. There are no rules or statutes which require that the Department consider the status of, or otherwise take into account, a DRI in evaluating an application for an ERP or proprietary authorization. Impacts on Manatees After reviewing the application for an ERP, the Department determined that the project, as proposed, should be denied because of direct, secondary, and cumulative effects it would have on manatees. The Department further determined that the applicant had not met the applicable requirements under Florida Administrative Code Rule Chapter 18-21 for authorization to use sovereign submerged lands. In making these determinations, the Department considered not only potential deaths of manatees, but also potential impacts such as harassment, disturbance, and sub-lethal boat strikes. The latter strikes may cause permanent injury and can affect reproduction and behavior. The State is a refuge and sanctuary for the manatee. See § 379.2431(2), Fla. Stat. The manatee is a marine mammal that can live as long as sixty years. It is unable to tolerate prolonged exposure to temperatures below around sixty-one degrees, which makes it susceptible to cold-related stress and death. Consequently, the manatees typically seek warm water when temperatures drop below sixty-eight degrees, migrating seasonally over extensive geographic areas. Hancock's marina is located just off the River. The River is one of the most studied and significant habitats for manatees on the west coast of Florida. The County's water bodies, including the River, provide manatees with submerged aquatic vegetation for foraging, fresh water sources, and several warm-water sites to use as refuges during colder weather. Hancock Creek, which is used to access the River from the marina, is an area used by manatees because it provides fresh water and a quiet environment. Manatees also use the River as a major travel corridor between the Florida Power and Light Company (FPL) power plant on the Orange River, a tributary of the River located around eight miles upstream from the project site, and the estuaries found downstream where foraging resources are abundant. Hundreds of manatees go up and down the River throughout the year, and those traveling to and from the warm water around the FPL plant must travel past Hancock Creek. Manatee deaths have occurred within a five mile radius of the project site. Also, the number of manatee watercraft- related deaths in the River has steadily increased over the years. According to a 1998 study of boating activity in the County, vessels use the River more as a travel corridor to the bays and estuaries outside of the River than as a destination itself, and that on weekends there is almost constant traffic with vessels leaving or entering the mouth of the River every thirty-five seconds. The majority of the boats leaving the project site are expected to travel downstream through the mouth of the River, an area with substantial vessel congestion. This travel pattern, in conjunction with the typical travel patterns of manatees, indicates that there is a great potential for boat/manatee overlap in the River, increasing the likelihood of impacts to manatees. Besides manatee deaths, there are sub-lethal effects of increased boat traffic in the area. Increased traffic in important manatee areas may create disturbances which will alter behaviors such as feeding, suckling, or resting, or it may separate mothers from their calves. Also, vessel traffic may cause them to leave preferred habitats. Finally, as noted above, vessel collisions with manatees produce non-lethal injuries as well, causing pain and extreme scarring, which can alter natural behaviors and affect reproduction. The single biggest known cause of death to manatees is impacts from boats. The project would increase the risk of watercraft collisions with manatees in this region. As the level of boat traffic increases, the probability of boat and manatee collisions is also likely to increase. Because the project is located along the travel corridor between the largest wintering aggregation of manatees on Florida's west coast and their local foraging habitat, the expected secondary impacts from increased vessel traffic associated with the project is expected to reduce the value of the functions of the River as a travel corridor. Therefore, the secondary impacts of vessel traffic from the expansion of the marina are expected to result in adverse impacts to manatees. In 1990, the DNR reviewed the proposed DRI for this site under the state manatee program. It found that during the preceding thirteen years (1976-February 1990), thirty-six manatees had died from water-related injuries in the County. Within a five-mile radius of the site, four manatees had died from watercraft-related injuries. DNR concluded that since the manatee protection speed zones for the River had just been established, they were expected to offset the impact of the additional 198 slips. From March 1990 until September 2006, however, twenty-five additional manatees have died from watercraft-related injuries within a five-mile radius of the site. Therefore, the number of deaths had increased without the additional 198 slips. The logical inference is that if the new slips are allowed, boat traffic and the associated adverse impacts on manatees will likewise increase. The fact that dry slips will be used does not change the Department and Commission's evaluation of the project. A boat has the same risk to a manatee whether stored in a wet or dry facility. Marine industry groups suggest that an average usage rate is between ten and fifteen percent at any time, and that usage is likely to increase on the weekends. Thus, as density increases so does the risk. In addition to its own analysis, the Commission reviewed the County MPP, which indicated that nine additional slips at this location would be acceptable, for a total of thirty-nine. This number was calculated by using a slip density of three slips for every one hundred feet of shoreline owned. (The actual linear feet of shoreline owned by Hancock is unclear. The Commission concedes that Hancock "may own a total of 1,214 linear feet of shoreline.") A MPP typically allows for higher boat densities in areas that pose less risk to manatees and lower boat densities in higher risk locations. Had the MPP not been considered, the number of allowable slips would remain at thirty since the MPP provides for a countywide strategy instead of a case-by-case review. To date, the Commission has never recommended approval of a marina application in the County that would authorize more docks than the MPP would authorize. The Commission initially makes an independent assessment of the application without regard to the MPP. In this case, based upon mortality data, aerial surveys, telemetry data, rescue data, and boat studies, the Commission determined that no further slips are appropriate. Therefore, even if the County's MPP is based upon outdated data and analysis, as Hancock contends, approval of the application would not be warranted. Petitioner's expert posited that the proposed project would only result in one manatee death over the next twenty years, which would amount to no more than a de minimus impact on the overall population. Assuming this to be true, manatees are nonetheless an endangered species, and there is no minimal amount of death that is considered acceptable. The witness also opined that Hancock is entitled to an unlimited number of slips under the MPP due to flawed data and analysis underpinning that document. In formulating his recommendations, however, Hancock's expert relied on mathematical models and statistics while ignoring the principles of manatee behavior and biology. Finally, the expert agreed that the greater the number of boats in the water, the greater the likelihood that a manatee could be accidentally crushed. On the issue of impacts to manatees, the testimony of the Commission witnesses is deemed to be the most credible and persuasive. The more persuasive evidence supports a finding that the marina will be located in an area adjacent to the River, that large numbers of manatees use the River, and that the project is expected to increase boat traffic. This in turn will lead to a higher incidence of boating-related manatee casualties in the area. Therefore, the proposed activity adversely affects the conservation of wildlife and marine productivity in the vicinity of the project; it adversely affects the marine productivity in the area; it is permanent in nature; and it diminishes the current condition and relative value of functions performed by areas affected by the activity. On balance, then, the project is contrary to the public interest. Based on the evidence presented, Hancock has not provided reasonable assurance that the project will not cause adverse secondary impacts to water resources, as required by Florida Administrative Code Rule 40E-4.301(1)(f). Similarly, based on the evidence presented, Hancock has not provided reasonable assurance that the project will not result in unacceptable cumulative impacts upon wetlands and other surface waters, as required by Florida Administrative Code Rule 40E-4.302(1)(b). By failing to provide reasonable assurances that the facility will not be harmful to water resources, that the secondary impacts from the facility will not cause adverse impacts to the functions of wetlands and surface waters, and that the project meets the public interest test, Hancock has failed to satisfy the requirements of Section 373.4132, Florida Statutes. Mitigation If an applicant cannot meet the requirements of Section 373.414(1)(a), Florida Statutes, the Department "shall consider measures proposed by or acceptable to the applicant to mitigate adverse effects that may be caused by the regulated activity." As noted in Finding of Fact 27, supra, the Department is willing to approve an additional nine slips that would be allowed under the County MPP, for a total of thirty- nine. According to Hancock, this number is not acceptable because more slips are needed to make the project financially feasible. Although a copy of the application is not a part of this record, the testimony suggests that in its application, Hancock proposed certain measures to mitigate the impacts on manatees. In a letter to the Department dated November 8, 2007, however, the Commission stated that "[i]f the Applicant propose[s] changes to the project to minimize fish and wildlife resource impacts that are consistent with the Lee County MPP, such a project would be consistent with Chapter 370.12(2), F.S." (The Legislature has subsequently consolidated this statute into Section 379.2431, Florida Statutes.) Despite this lack of clarity in the record, sometime during the application process, and presumably before the Notice of Intent was issued, the Commission staff discussed with Hancock whether the following mitigation measures would offset or adequately reduce the impacts: placing a size restriction on boats docking at its facility; providing boater education; installing speed zone marking and making it a requirement for all boats at the marina to be equipped with a speed zone map or a Global Positioning Satellite unit with speed zone mapping; implementing a volunteer watch program to enforce speed limits; making a cash donation to study manatee population dynamics; and installing sonar avoidance technology on vessels. The Commission established that these measures, even if implemented, would not offset the impacts from 198 slips expected with phase 1 of the project. For example, the research associated with sonar technology is not yet completed, and devices are not available for boaters. Also, given the location of the project, even with additional law enforcement and boater education, the impacts would not be offset due to the level of traffic already existing on the River at that site, and the importance of the area to manatees. The middle of the River is a high-speed corridor (with a twenty-five miles per hour speed limit) and even with one hundred percent compliance in that zone, a small boat can still hit and kill a manatee. The Proprietary Authorization Because denial of the ERP is being recommended, the proprietary authorization must likewise be denied. See Fla. Admin. Code R. 62-373.075(2). Even so, for the purpose of addressing all issues in this Recommended Order, a discussion of the application for proprietary authorization is set forth below. Florida Administrative Code Rule Chapter 18-21 contains the rules that implement the administrative and management responsibilities of the Department in authorizing activities in sovereignty submerged lands. Florida Administrative Code Rule 18-21.004 establishes the specific standards and criteria to be applied by the Department in determining whether Hancock should be allowed to use sovereign submerged lands. Paragraph (1)(a) provides that "[f]or approval, all activities on sovereignty lands must be not contrary to the public interest." The public interest is defined as "demonstrable environmental, social, and economic benefits which would accrue to the public at large as a result of a proposed action, and which would clearly exceed all demonstrable environmental, social, and economic costs of the proposed action." See Fla. Admin. Code R. 18-21.003(43). The more persuasive evidence supports a finding that, on balance, the project is contrary to the public interest based upon the standards in the rules. Florida Administrative Code Rule 18-21.004(2)(a) provides that "[a]ll sovereignty lands shall be considered single use lands and shall be managed primarily for the maintenance of essentially natural conditions, propagation of fish and wildlife, and traditional recreational uses such as fishing, boating, and swimming. Compatible secondary purposes and uses which will not detract from or interfere with the primary purpose may be allowed." The evidence does not show that Hancock's proposed marina expansion constitutes a secondary use not interfering with the propagation of wildlife. Therefore, the project is not consistent with this rule. Florida Administrative Code Rule 18-21.004(2)(b) provides that "unless there is no reasonable alternative and adequate mitigation is proposed," activities which result in significant adverse impacts to sovereignty lands and associated resources shall not be approved. As previously found, the mitigation measures proposed by Hancock are not adequate. Paragraph (2)(i) of the rule further provides that activities in submerged lands "shall be designed to minimize or eliminate adverse impacts on fish and wildlife habitat, and other natural or cultural resources. Special attention and consideration shall be given to endangered and threatened species habitat." Because Hancock failed to prove that the project would not result in unmitigated adverse impacts to manatees, it fails to meet this criterion. Paragraphs (7)(d) and (e) of the rule are general conditions for authorization and provide that activities "shall be constructed and used to avoid or minimize adverse impacts to sovereignty submerged lands and resources" and "shall not adversely affect any species which is endangered, threatened, or of special concern." Here the more persuasive evidence shows that neither condition has been met.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Environmental Protection enter a final order denying Petitioner's application for an ERP and authorization to use sovereign submerged lands to expand an existing marina on Hancock Creek in Lee County, Florida. DONE AND ENTERED this 15th day of May, 2009, in Tallahassee, Leon County, Florida. S DONALD R. ALEXANDER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 15th day of May, 2009.

Florida Laws (9) 120.569120.57253.002267.061373.4132373.414373.428379.2431380.23 Florida Administrative Code (6) 18-21.00318-21.00440E-4.30140E-4.30262-330.20062-343.075
# 3
DAYTONA BEACH GENERAL HOSPITAL AND SAXON GENERA vs. DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES, 83-000160CON (1983)
Division of Administrative Hearings, Florida Number: 83-000160CON Latest Update: Aug. 27, 1984

The Issue The issue in these proceedings is whether HRS should grant petitioners' application for a certificate of need to build a 100-bed general acute care hospital in Deltona, Florida. The parties have stipulated to the applicants' ability to staff the proposed facility and that no issue remains as to the criteria set forth in Section 381.494(6)(c)(3), (5), (6), (7), (10), (11), and , Florida Statutes (1983).

Findings Of Fact Petitioners propose to "transfer" 100 beds from Daytona Beach General Hospital (DBGH) in Subdistrict 4 of District 4 to Deltona, which lies in Subdistrict 5 of District 4; and have agreed to "delicensure" of an additional 50 beds at DBGH (for a total of 150) if their application for a certificate of need (CON) to build in Deltona is granted. Saxon General Hospital, Inc. (Saxon) is a wholly owned subsidiary of Daytona Beach General Hospital, Inc., which operates DBGH. HCA's Central Florida Regional Hospital (CFRH), is located outside of District 4 altogether in Sanford, which is in Seminole County. Baker, Clay, Duval, Flagler, Nassau, St. Johns and Volusia Counties make up HRS District 4, the domain of the Health Planning Council of Northeast Florida, Inc. District 4 as a whole has more hospital beds than it needs. The present controversy concerns medical/surgical hospital beds in the two southern subdistricts of District 4, Subdistricts 4 and 5. Flagler County and Volusia County east of Little Haw Creek and Deep Creek comprise Subdistrict 4 of District 4. Deland, Deltona, Orange City and DeBary are in Subdistrict 5 of District 4, which is congruent with Volusia County west of Little Haw Creek and Deep Creek. See Appendix. THE DISTRICT PLAN The Health Planning Council of Northeast, Florida, Inc. has adopted a district health plan, Petitioner's Exhibit No. 6, but the plan has not been promulgated as a rule. HRS, but not CFRH, has admitted that petitioners' proposal is consistent with the district health plan. Among the policies stated in the plan is the following: If the district as a whole has a surplus of acute care hospital beds but the subdistrict has a substantial shortage, or if beds are not available or accessible within 30 minutes travel time in an urban county or 45 minutes travel time in a rural county to at least 90 percent of the county's residents, the state should consider the need for more beds on a subdistrict basis. (Reference: Chapter 10-5.11(23)(i) of the Florida Administrative Code.) Given the provisions as outlined above and so long as there is an overall surplus of hospital beds in the district, it is the policy of the Health Planning Council not to support approval of additional beds within a subdistrict until it can be clearly demonstrated by the circumstances that the number of beds needed in the subdistrict is substantial. With respect to subdistrict five, the plan makes the following recommendation: Within the framework of the most appropriate planning for the entire West Volusia-East Seminole County area, the State Office of Community Medical Facilities could give consideration to the transfer of acute care beds from within the district to the Deltona area--so long as the total number of licensed beds in the district does not increase. Any applicant to open hospital beds and other hospital services in Deltona should take into consideration the general needs of the Deltona area population. The Health Planning Council of Northeast Florida, Inc. adopted this recommendation with the specific purpose of declaring itself neutral as between then competing applications to build a hospital in Deltona. BED NEED BY RULE HRS has by rule specified a need for 195 medical/surgical, 18 intensive and cardiac care, ten obstetric and eight pediatric beds in Subdistrict 4 for the year 1988. Rule 10-16.005(1)(b) Petitioner's Exhibit No. 37, codified as Rule 10-17.005(1)(b), Florida Administrative Code. This represents 23 fewer medical/surgical beds than are presently licensed or authorized, but three more medical/surgical beds than are presently available in fact; the same number of intensive and coronary care beds as are presently available; two fewer obstetric and three fewer pediatric beds than are presently available in Subdistrict 5. Excess capacity in Subdistrict 4 is even more pronounced, according to Rule 10-17.005(1)(b), Florida Administrative Code. This HRS rule specifies a need for 911 medical/surgical, 122 intensive and coronary care, 26 obstetric and 33 pediatric beds in Subdistrict 4 for the year 1988. These figures represent a projected excess of 254 medical/surgical, 14 intensive and cardiac care, four obstetric and 35 pediatric, licensed or approved beds for Subdistrict 4 in 1988, assuming no more beds are licensed, approved, delicensed or disapproved, in the interim. BEDS IN PLACE In District 4's Subdistrict 4, there are seven general acute care hospitals. Bunnell Community Hospital, with 81 licensed or approved beds, is the only hospital in Flagler County. The other six are clustered along the coast between Ormond Beach and New Smyrna Beach. Licensed and approved beds aggregate 1,165 medical/surgical, 136 intensive and cardiac care, 30 obstetric and 68 pediatric for Subdistrict4. Not all of these beds are actually available for occupancy, however. DBGH, for example, is licensed at 297 beds but had only 115 beds available for use on average between October 1, 1980, and September 30, 1981. (At the time of hearing, its average daily census was 50 patients.) There are only two existing hospitals in District 4's Subdistrict 5, Fish Memorial Hospital (Fish) and West Volusia Memorial Hospital (West Volusia), both of which are located in or near Deland, an older population center in western Volusia County to the north of Deltona. West Volusia, which is further than Fish from the emerging Deltona-DeBary-Orange City population center in the southwestern part of the county, has 162 beds, of which 128 are medical/surgical; eleven are intensive or cardiac care; twelve are obstetric and eleven are pediatric. West Volusia had a 1983 average occupancy rate, based on 139 medical/surgical and intensive and coronary care beds, of 67 percent. During fiscal year 1981, most of West Volusia's admissions were of persons from Deland, but 22.34 percent of the total came from DeBary, Deltona and Orange City. Fish has 97 licensed beds, but only 71 are available for use. Of these, 64 are medical/surgical, and the remaining seven beds are devoted to cardiac and intensive care. Fish's physical plant is older and in need of replacement or rehabilitation. The Fish Memorial Hospital physical plant is a composite structure which is the result of three decades of renovation and add-on construction. * * * As a result, much of the facility does not comply with current building codes, the recommendations of the Joint Commission for Accreditation of Hospitals (JCAH) or current patient care management practices. An internal survey was begun to identify and quantify the extent of work necessary to bring the entire physical plant into compliance with all applicable codes or standards. The survey included all major components of the physical plant or hospital-wide systems that will have to be replaced or repaired within the next three year period just to maintain the current facility operations as a comparison to the replacement cost. The survey identified over thirty projects, ranging between $4,000 and $1,500,000 each. Furthermore, these direct costs do not account for interruption of medical services to the community residents, nonproductive staff time due to phasing of renovation, and patient inconveniences during construction. Intervenor's Exhibit No. 1., p.1. Rehabilitation would involve direct costs of some $4,500,000.00. In July, August and September of 1980, Fish had 105 admissions of persons residing in the Deltona and DeBary-Orange City census division, or 22.9 percent of its total admissions. In the same months the year before 87 admissions or 23 percent of the total was attributable to the Deltona and DeBary-Orange City census divisions. The great majority of Fish's patients came from the Deland census division during both periods. Fish's 1983 average occupancy rate was 46.7 percent, but, at time of hearing, occupancy was at 80 percent. Licensed at 226 beds, CFRH had about 200 beds staffed at the time of the hearing, including ten pediatric and nine obstetrical beds. (T. 592) CFRH's average occupancy was 72 percent for January and February of 1984, down from 76.9 percent for the same period last year. During the two months preceding the hearing, CFRH was on "red flag" status. No admissions were allowed, unless approved by the chief of staff; but no true emergencies were turned away. Some 34.8 percent of CFRH's admissions are of people who reside in the Deltona- DeBary-Orange City area or elsewhere in Volusia County. CFRH meets most of the need for medical/surgical beds attributable to the population in southwestern Volusia County. (Testimony of Scott) Most people living in the Deltona-DeBary- Orange City area who need hospitalization leave the county, in order to be admitted at intervenor CFRH. ACCESSIBILITY The evidence did not establish what proportion of the population of Subdistrict 5, if any, is further than 30 minutes' driving time from the nearest hospital at present, or what proportion would be in the future. Petitioners' expert measured travel times from central points in DeBary, Orange City, Sanford and Deland to area hospitals and to the site proposed for a new hospital, with the following results: West Volusia Fish Memorial Central Florida Proposed Memorial Hospital Regional Daytona Beach TO: Hospital (Central (West Sanford) General (North Deland) (Saxon Blvd. Deland) at 1-4) (A) (B) (C) (D) DeBary 32.2 26.4 18.2 14.9 Orange 28.6 22.8 26.3 17.7 City Deltona 36.8 31.0 24.6 11.5 Sanford 51.6 44.9 17.1 33.7 Deland 20.7 14.9 41.7 32.6 In computing these averages, peak travel times were weighted equally with other travel times measured in December of 1983, and January and February of 1984. One route to Sanford and CFRH from Deltona entails crossing a drawbridge. It takes Beverly Spitz "20 minutes just to get out of Deltona," with its winding roads and abundance of elderly drivers. Mary Lou Foster takes 29 to 45 minutes to drive from her Deltona home to CFRH. John Schmeltz can do it in "about 25 minutes." In February of 1982, When Mrs. Schmeltz passed out, the ambulance he summoned took 22 minutes to arrive. John Mosley made the drive from his Deltona home to CFRH in 25 minutes, but that was the night he thought his wife had had a heart attack and he "averaged over 100 miles an hour." (T. 204) "[A]t night . . . you realize just how far it is." (T. 211) Clyde Mann's testimony to the effect that the remoteness of existing hospitals had cost lives went unchallenged. Mary Meade, a registered nurse, reported that the Deltona area "ha[s] lost several patients, several people" (T. 216) in the time it takes to get to a hospital. Bernie Levine, a public witness, testified that there were "constant people dying. They didn't make it to the hospital." (T. 210) A hospital in Deltona would significantly improve access for the people of Deltona, and would also improve access for residents of Orange City and DeBary, albeit less dramatically. FINANCIAL FEASIBILITY The parties stipulated that land is available for the project, and that projected construction costs are reasonable. Daytona Beach General Hospital, Inc. (DBGH, Inc.) plans to lend its subsidiary Saxon General Hospital, Inc. $4,159,700; and petitioners plan to borrow the remaining $12,569,000 necessary to build the hospital, at 13 percent, repayable over a 25 year period, with the new hospital serving as collateral. DBGH, Inc. had "[a]pproximately one-million-three, one-million-four" (T. 245) on hand which could be devoted to construction of a new hospital in Deltona, at the time of hearing. The remaining "equity," $2,900,000 or so, is to be raised by sales of DBGH, Inc.'s common stock. Of the 2,000,000 shares of common stock authorized, Daytona Beach General Hospital, Inc. has issued 600,000. The hope is that additional shares can be issued and sold at $15 a share, which is about five times as much as the stock is currently trading for over the counter. John E. Kaye and Jackson B. Bragg, the osteopaths who between them own 405,000 shares of DBGH, Inc. common, each plan to guarantee purchase of another $1,400,000 worth of DBGH, Inc. common stock, when it is issued. The net worth statements of each man came in as exhibits at hearing, for the purpose of showing their supposed ability to honor such a guarantee. Aside from the DBGH, Inc. stock, however, neither man had sufficient net assets, and this assumes the accuracy of their financial statements, which listed as assets $253,000 in unsecured receivables of unstated age. Cars and boats were valued at cost, as was a pick-up truck ($3,000) while real estate was apparently valued at somebody's idea of market. Between them, the two doctors purport to have $150,000 worth of household furniture. For obvious reasons, no accountant's name appeared on these documents. The doctors have an agreement between them to the effect that neither sells DBGH, Inc. stock unless the other also sells. Their unaudited statements put the value of DBGH, Inc. stock at $20 a share. A few days after the Daytona Beach News Journal reported that "HCA had lost the right to purchase Fish," (T. 264) Robert E. Hardison, Jr. of HCA spoke to Drs. Kaye and Bragg and told them "he realized it was futile to try to continue seeking a CON for Deltona adding new beds unless he could get some existing beds from [DBGH] and move them to Deltona." (T. 266) Mr. Hardison asked Drs. Bragg and Kaye what they would be willing to sell their stock for but did not offer to buy it. Shortly before the hearing they were offered $25 a share for all their holdings on condition the prospective buyer could arrange financing, and on condition that Saxon receive a certificate of need. This price is almost certainly higher than could be gotten in the market for shares which would not give the buyer a controlling interest in DBGH, Inc. One Milton W. Pepper appeared at hearing and testified without contradiction that, in the event a certificate of need issued, he was willing and able to invest approximately $1,500,000 "in the beginning. . . and make arrangements for the additional $5,000,000 if necessary." Drs. Kaye and Bragg may lose control of the corporate petitioners in the process, but there is every reason to believe that money to build a hospital would be available. After raising a quarter of the project cost, DBGH, Inc. proposes to lend that sum to Saxon, at one percent above prime. Although this arrangement would mean that the money was "debt" as between the subsidiary and its parent, outside financers would apparently treat the money as equity. Loy D. Deloney, an underwriter for Stephens, Inc., "the ninth-ranking investment banking firm in the country in terms of equity," knows "of at least 10 major financial institutions that would be interested in" providing long-term financing, if the CON issues. The future holds many uncertainties for hospitals, but whether this money could be repaid and whether a new hospital would be otherwise feasible financially depends finally on how many patients it would serve. POPULATION GROWTH FORECAST The population of census tracts 908, 909, 910.02, 910.03 and 910.04, in which Deltona, Orange City and DeBary are located, is projected to increase by some 11,000 persons between 1984 and 1989, when the population in this part of southwestern Volusia County is expected to be 48,789. Of the projected 1989 population of census tracts 908, 909, 910.02, 910.03, 910.04, eleven thousand one hundred twenty-four persons are expected to be over 65 and eleven thousand one hundred twenty-four persons are expected to be less than 65 but older than Some three fifths of Deltona's present population (about 26,000) is over 55 years old. EFFICIENT UTILIZATION LIKELY IN SUBDISTRICT Even without the lure of a hospital, physicians have opened offices in southwest Volusia County. Seven specialists on the medical staff at CFRH have part-time practices in the Deltona-DeBary-Orange City area. A half dozen family practice physicians practice in the area full-time. They admit to hospital an average of 50 patients daily, 80 percent of them to CFRH. Before HCA abandoned its application for a certificate of need to "transfer Fish's beds" and build a new 97-bed hospital in Deltona, it caused a health service study to be done by John Short & Associates. CFRH offered the study as evidence at hearing. Intervenor's Exhibit No. 1. The CFRH study looked at the western area of Volusia County, as a whole, including Deland, and concluded that 1987 would see 12,686 medical/surgical discharges of residents of western Volusia County. The CFRH study calculated the average length of a patient's stay in hospital at 7.03 days. CFRH's own evidence shows, therefore, that 89,183 medical/surgical patient days attributable to the population of the DeBary-Orange City, Deland and Deltona census districts can be expected in 1987. CFRH's administrator, James D. Tesar, predicted that CFRH "could lose 80 percent of its admissions from the area including Deltona, Geneva, DeBary, Osteen, and Orange City," if Saxon built a new hospital in Deltona. In 1983, CFRH admissions from these Volusia County communities totalled 3,150. If a new hospital in Deltona did indeed change patient flow to the extent Mr. Tesar warns is possible, there would still be 630 admissions annually to CFRH of residents leaving southwest Volusia County for hospitalization. If west Volusia Countians' admissions drop to 630 at CFRH, CFRH will be supplying only 4,429 patient days (630 X 7.03) to residents of West Volusia County. In that case, some 84,754 medical/surgical patient days will have to be accommodated in 1987 by hospitals within Subdistrict Five (or outside the subdistrict at hospitals other than CFRH). In 1987, to the extent patient days attributable to southwest Volusia County residents admitted to pediatric or obstetric beds at CFRH exceed patient days at CFRH attributable to Subdistrict Five residents living outside Deltona, Geneva, DeBary, Osteen and Orange City, 84,754 would be an understatement. Dividing patient days by the number of days in a year (84,754/365) yields an average daily medical/surgical census of 232. Medical/surgical beds are put to good use when they are full 80 percent of the time, almost all health planners agree. In order to accommodate an average daily census of 232 at an 80 percent average occupancy rate, 290 medical/surgical beds will be needed as early as 1987. Only 192 medical/surgical beds are now open in Subdistrict Five. Chances are good that 292 hospital beds in Subdistrict Five could be used efficiently long before the spring of 1989. IMPACT OUTSIDE SUBDISTRICT A new 100-bed hospital in Deltona could operate consistently with efficient utilization of the medical/surgical beds already open in Subdistrict Five, even if the new hospital achieved 80 percent average occupancy as early as 1987 but only by diverting patients from CFRH. The effect on CFRH would be significant, but temporary, since population growth would ensure its efficient utilization once again within two to four years of the 1986 opening of a 100-bed hospital in Deltona. All along, CFRH's loss of patients to a new Deltona hospital would be offset to some extent by ongoing population growth in Seminole County where CFRH is located. CFRH's own application for a certificate of need was granted on the theory that a new hospital of CFRH's size was needed just to serve the population of Seminole County. Petitioners' expert concluded that CFRH, Fish and West Volusia had had only 1,139 more medical/surgical patient days to split among themselves in 1983 than they could be expected to have in 1988, with a 100-bed hospital in its second year of operation in Deltona. DBGH's surrender of the right to open 150 additional beds would have no immediate economic impact; the effect would be to reduce excess capacity in Subdistrict Four, but on paper only. No beds would be closed, no staff dismissed, no expenses pared. But, if petitioners' efforts to obtain a CON for a new hospital in Deltona fail, they intend to expend $10,000,000 for renovation of DBGH, a project for which they already have a CON. This would inevitably mean recovering additional costs from payers for hospital care in Subdistrict Four. Like the Deltona proposal, the renovation proposal contemplates some reduction in beds in Subdistrict Four, although fewer: "50-some-odd." (T. 293) The 150 bed reduction in approved beds in Subdistrict Four contemplated by the pending application would mean that, if and when new hospital beds are needed in Subdistrict Four, they could be added wherever they are needed rather than being added at DBGH whenever management decrees.

Recommendation Upon consideration of the foregoing, it is RECOMMENDED: That HRS grant petitioners' application for a certificate of need to construct a 100-bed acute care general hospital in Deltona. DONE and ENTERED this 9th day of July, 1984, in Tallahassee, Florida. ROBERT T. BENTON II Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 9th day of July, 1984. APPENDIX * * NOTE: APPENDIX to this Recommended Order is a map which is available for review in the Division's Clerk's Office. COPIES FURNISHED: F. Philip Blank, Esquire 241 East Virginia Street Tallahassee, Florida 32301 Ronald L. Book, Esquire Sparber, Shevin, Shapo & Heilbroner 30th Floor AmeriFirst Building One Southeast Third Avenue Miami, Florida 33131 James M. Barclay, Esquire 1317 Winewood Blvd. Building 2, Suite 256 Tallahassee, Florida 32301 Thomas A. Sheehan, III, Esquire Jon C. Moyle, Esquire Donna Stinson, Esquire, and Thomas M. Beason, Esquire, of Moyle, Jones & Flanigan Post Office Box 3888 West Palm Beach, Florida 33402 David Pingree, Secretary Department of HRS 1323 Winewood Blvd. Tallahassee, Florida 32301

Florida Laws (3) 7.03910.02910.04
# 4
JANE R. WILKINSON vs DIVISION OF RETIREMENT, 92-001070 (1992)
Division of Administrative Hearings, Florida Filed:Bradenton, Florida Feb. 20, 1992 Number: 92-001070 Latest Update: Apr. 08, 1993

Findings Of Fact Upon consideration of the oral and documentary evidence adduced at the hearing, the following relevant findings of fact are made: The Petitioner, Jane R. Wilkinson, f/n/a Jane Nelson Riley and Wilkinson were married on February 12, 1983 and lived together as man and wife until his death, except for a short period of separation from mid-October, 1990 until December 31, 1990. During this short period of separation, Wilkinson continued to perform chores and special tasks for his wife at their home. After being reunited in January, 1991, they lived together in a close relationship until Wilkinson's death. Petitioner is the surviving spouse and designated sole beneficiary of Wilkinson for any benefits under the Florida Retirement System having been so designated by Wilkinson at the time of their marriage. Wilkinson was employed full time by the Manatee County Sheriff and remained employed by the Manatee County Sheriff until his death. At the time of his death, Wilkinson was classified as a correctional officer carrying the rank of sergeant. Wilkinson was certified as a special risk member of the Florida Retirement System effective January 1, 1983. Before his marriage to Petitioner, Wilkinson had been married to Audrey Lynn Wilkinson, n/k/a Audrey Lynn Batchelor. There were two children born of this marriage. This marriage was dissolved in 1982. The former wife was granted custody of the children. Wilkinson was ordered to pay child support to the former wife. Sometime around March, 1991, the former wife petitioned the court for an increase in child support from Wilkinson. This action by the former wife had caused some concern for Wilkinson, mainly because of its effect on his present wife. However, they apparently had reached some sort of settlement just prior to his death but the settlement was not presented to the court before his death. Wilkinson served in the United States Army in the United States and overseas between December 30, 1974 and February 13, 1981. Wilkinson's military service between December 30, 1974 and May 7, 1975, comes within the definition of military service as defined in Section 121.021(20)(b), Florida Statutes. In 1989, after obtaining permission from the Manatee County Sheriff's Office, Wilkinson was employed part time on the ground crew of American Airlines (AMR Services) at Sarasota-Bradenton Airport. Wilkinson had expressed hope of obtaining ten years of creditable service in the Florida Retirement System before resigning from the Manatee County Sheriff's Office to work full time with AMR Services. Wilkinson's last duty assignment with the Manatee County Sheriff's Department was at the Port Manatee Stockade (Port Manatee). Port Manatee was operated under a method known as "direct supervision" of inmates. This method allowed the inmates to be supervised in a dormitory type setting or "pod" from approximately 5:30 a.m. to approximately 11:30 p.m. with the correctional officers "locked in" with approximately 48 inmates. The inmates were locked in the cells between approximately 11:00 p.m. and 5:30 a.m. This type supervision is more in favor of inmates than correctional officer. Port Manatee was one of three of this type facility in Florida and one of ten in the United States. Since Wilkinson's death the facility has begun shifting back to the traditional type facility. During the time Wilkinson worked with the Sheriff's Department the Department was cited for overcrowding correctional facilities in Manatee County, including Port Manatee. Although there were no "life felons" incarcerated in Port Manatee, there were second and third degree felons who exhibited aggressive and violent behavior creating problems for the correctional officers "locked in" with them. There were times when the inmates assaulted and injured the correctional officers, including Wilkinson. Port Manatee was understaffed during the time Wilkinson was assigned there. Wilkinson favored the more traditional method of handling inmates rather than direct supervision and this resulted in problems between Wilkinson and some of his supervisors. Additionally, this created problems between Wilkinson and some of the inmates. Wilkinson's concern about his own safety and the safety of those under his supervision at Port Manatee created a stressful situation for Wilkinson. Wilkinson's coworkers, including some of his supervisors, considered Wilkinson a hard worker, dedicated to those whom he supervised, a "go-getter" and a "perfectionist". Sheriff Wells considered Wilkinson an excellent correctional officer, and on a scale of one to ten would rate him as an eight. In the Spring of 1991 Wilkinson began having difficulty in coping with the pressures and stresses of his job with the Sheriff's Department. Wilkinson had conflicts with certain supervisors and felt that these supervisors were not backing him in protecting "his men" at Port Manatee. As early as the Spring of 1991 Wilkinson was "stressed-out", "tired all of the time", tense, "wired" and a "bundle of nerves". Wilkinson was frustrated with his job and was sad and withdrawn. During this time, Wilkinson suffered from sleeplessness which is an indication of depression. On August 15, 1991, Wilkinson spoke with David Clooney, a close friend and coworker at Port Manatee. Wilkinson was in tears and depressed about not being able to handle his job at Port Manatee. Wilkinson wrote a good-bye letter to the Petitioner on this date and went to the Skyway Bridge with the intention of killing himself. Instead of killing himself on August 15, 1991, Wilkinson called Petitioner and told her that he needed help. Petitioner and David Clooney picked Wilkinson up and carried him to Manatee Memorial Hospital where he was admitted for treatment as a voluntary patient in the Life Management Center. Wilkinson was admitted to the hospital under the care of a psychiatrist, Dr. Hector Fosser. Wilkinson's mental condition on admission was diagnosed as major depression by Dr. Orrosio, a psychiatrist covering for Dr. Hector Fosser in his absence. However, upon Dr. Fosser's return, Dr. Fosser diagnosed Wilkinson,s mental condition as major depression with suicidal ideation. During his stay at the Life Management Center, Manatee Memorial Hospital, Wilkinson was treated by Dr. Hector Fosser, a licensed psychiatrist, Dr. David Thomas, a licensed psychotherapist and Rebecca Gramblin, RN, specializing in psychiatric nursing. On August 28, 1991, Dr. Fosser discharged Wilkinson from the hospital, apparently improved. Dr. Fosser's diagnosis upon discharge was major depression, single episode with suicidal ideation. After his discharge from the hospital, Wilkinson continued under the care of Dr. Fosser on an outpatient basis. Early in Wilkinson's post-hospitalization period his mental condition appeared to improve for a time. Apparently, Wilkinson complied with the medication prescribed by Dr. Fosser. However, Wilkinson's mental condition deteriorated, and he became anxious and depressed. Wilkinson was scared, apprehensive about working with inmates, fearful for his "troops", and fearful of what he considered unsafe conditions at Port Manatee. Wilkinson felt that he had "lost his edge and the ability to handle risks and problems at Port Manatee". On September 30, 1991, Wilkinson kept his appointment with Dr. Fosser who prescribed lithium and another medication for him. Dr. Fosser also wrote a note of authorization for Wilkinson to return to work at AMR Services but not for returning to work at the Sheriff's Department. Also on September 30, 1991, Wilkinson wrote six suicide letters addressed to Sheriff Wells, several family members and a friend. On October 1, 1991, Wilkinson continued to be upset about his job at Port Manatee and wrote four additional suicide letters addressed to his wife, mother and two friends. Also, Wilkinson talked to his close friend, David Clooney and advised him that he intended to kill himself. Clooney was unable to delay him long enough for someone to get to Wilkinson's home and possibly prevent the suicide. After talking to Clooney, Wilkinson went into his backyard and killed himself with a gunshot to his head. Dr. Fosser, Dr. Thomas and Nurse Gramblin all testified that matters such as Wilkinson's former wife demanding more child support could have been the cause of some of the stress that Wilkinson was experiencing. However, they were all of the opinion that his job at Port Manatee was the major cause of his stress which led to his mental illness, diagnosed as major depression with suicidal ideation. There is competent substantial evidence to establish facts to show that Wilkinson's mental condition was caused or aggravated by the stress resulting from his employment with the Manatee County Sheriff's Department, and that his suicide was the result of his mental illness. There is competent substantial evidence to establish facts to show that Wilkinson became disabled in the line of duty on August 15, 1991, and died as a result of his disabling illness on October 1, 1991. At the time of his death on October 1, 1991, Wilkinson had 9.91 years of creditable service which included his time with the Manatee County Sheriff's Department, Manatee Memorial Hospital and Sarasota County Public Hospital Board but did not include any military time. At the time of Wilkinson's death his rate of pay was $1,038.88 biweekly or an annual and monthly rate of $27,010.88 and $2,250.91, respectively.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is recommended that the Division of Retirement enter a final order finding that Dale S. Wilkinson suffered death in the line of duty and awarding his surviving spouse and designated beneficiary, Jane R. Wilkinson, the appropriate benefits commensurate therewith. RECOMMENDED this 22nd day of March, 1993, at Tallahassee, Florida. WILLIAM R. CAVE Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 22nd day of March, 1993.

Florida Laws (4) 120.57121.021121.091121.111
# 5
SAVE THE MANATEE CLUB, INC., vs SEA RAY BOATS, INC., AND FLORIDA FISH AND WILDLIFE CONSERVATION COMMISSION, 01-003992 (2001)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Oct. 17, 2001 Number: 01-003992 Latest Update: Apr. 30, 2002

The Issue The issue is whether proposed regulations for Brevard County manatee protection areas by the Florida Fish and Wildlife Conservation Commission (FWCC), which are amendments to Rule 68C- 22.006, Florida Administrative Code, noticed in the April 20, 2001, Florida Administrative Weekly (F.A.W.)("Proposed Rule"), with a Notice of Change published in the F.A.W. on June 15, 2001, are an invalid exercise of legislative authority.

Findings Of Fact Based upon observation of the witnesses and their demeanor while testifying, the documentary evidence received, and the entire record compiled herein, the following material and relevant facts are found. Effective July 1, 1999, Respondent, FWCC became primarily responsible for implementation of the Florida Manatee Sanctuary Act, Section 370.12(2), Florida Statutes (2000) instead of the Department of Environmental Protection, by operation of Section 45, Chapter 99-245, Laws of Florida. FWCC is the State agency responsible for promulgating rules pursuant to Section 370.12, Florida Statutes. Respondent noticed proposed rules, and is a mandatory party to a challenge thereto. Section 120.56(1)(e), Florida Statutes. STANDING OF THE PARTIES McGill, Pritchard, Dovark, Gentile, Akins, Mason, Jaren, Robertson, Standing Watch, Inc., Save the Manatee Club, Inc., Florida Wildlife Federation, Inc., and Sea Ray Boats, Inc.1, are substantially affected by one or more of the Proposed Rules in that they operate motorboats in one or more of the areas proposed for regulation, or in that they represent the interests of members who operate motorboats in one or more of the areas proposed for regulations, or who desire to protect manatees and manatee habitats on behalf of members who derive aesthetic or other benefits from manatees, and who observe or otherwise enjoy manatees in Brevard County and elsewhere. Intervenor, Florida Power and Light Company (FPL), is a Florida corporation that owns and operates the Cape Canaveral Power Plant located in Cocoa, Brevard County, Florida. FPL's operations are specifically addressed in the proposed rule in that the proposed rule creates a no-entry zone along an area bordering the FPL Cape Canaveral Power Plant property boundary including easements and right-of-way where electrical generation operating equipment and electrical distribution and transmission equipment are located. Intervenor, Cocoa Beach is a Florida Municipal Corporation located in Brevard County. The Cocoa Beach Sports Area located with the Banana River Lagoon has been designated since 1988 as an area for water-related recreational activities for the residents of the City of Cocoa Beach and for the general public. The Proposed Rule seeks to impose speed restrictions for boats operating within this area and, if promulgated, will directly regulate and restrict the boating, fishing and other water-related recreational activities of the public within the area. Intervenor, Titusville is a Florida Municipal Corporation located in Brevard County, whose elected body has determined that a substantial number of its residents are substantially affected in the Proposed Rule. The parties alleged facts supported their standing in individual petitions, and the parties stipulated to standing. Therefore, none of the Petitioners presented any evidence regarding their standing. Petitioners and Intervenors are substantially affected by one or more sections of the proposed rule in that they operate motorboats in one or more of the areas proposed for regulation, or they represent the interests of members who operate motorboats in one or more of the areas proposed for regulation or who desire to protect the manatees and manatee habitat on behalf of members who derive aesthetic or other benefits from manatees and who observe or otherwise enjoy manatees in Brevard County. ADOPTION PROCESS FOR THE 2001 RULE PROPOSAL On September 6, 2000, the Commission authorized staff to initiate amendments to the Brevard County rules at a public meeting in Deland, Florida. On October 6, 2000, the Commission published a Notice of Rule Development in the Florida Administrative Weekly and announced a rule development workshop. On October 26, 2000, the Commission staff conducted a rule development workshop in Melbourne, Brevard County, Florida. On January 24, 2001, the Commission directed staff to conduct a second rule development workshop in Brevard County, Florida. On February 16, 2000, the Commission published notice in the Florida Administrative Weekly of the rule development workshop scheduled for March 7, 2000. On March 7, 2000, the Commission staff conducted a second rule development workshop in Viera, Brevard County, Florida. On March 30, 2000, the Commission conducted a public meeting in Tallahassee, Florida, and authorized publication of a Notice of Proposed Rulemaking in the Florida Administrative Weekly. On April 20, 2001, the Commission published a Notice of Proposed Rulemaking in the Florida Administrative Weekly and advertised public hearings to be held on May 3 and May 23, 2001. On May 3, 2001, the Commission staff conducted a public hearing on the Proposed Rule in Melbourne, Brevard County, Florida. On May 23, 2001, the Commission staff conducted a public hearing on the Proposed Rule in Melbourne, Brevard County, Florida. On June 15, 2001, a Notice of Change was published in the Florida Administrative Weekly. There are no algorithms, formulae, protocols, matrices, math models, or metrics used by the Commission to combine the individual data sources into findings that idle-speed, slow-speed, or no-entry zones were required for any specific zone in question. Aerial surveys have been conducted by the Florida Marine Research Institute (FMRI) and others. One type of aerial survey technique is a statewide survey. These surveys are typically flown in the winter, after the passage of a cold front. Typical winter aggregation areas are included in these surveys. The synoptic surveys are used for monitoring winter aggregations of manatees. Population biologists working on manatee recovery view synoptic survey results as the best available information about the minimum estimated size of the manatee population in Florida at this time. The statewide synoptic survey data from the past several years is as follows: 1991 1,268 manatees 1991 1,465 manatees 1992 1,856 manatees 1995 1,443 manatees 1995 1,822 manatees 1996 2,274 manatees 1996 2,639 manatees 1997 2,229 manatees 1997 1,709 manatees 1998 2,022 manatees 1999 2,034 manatees 1999 2,354 manatees 2000 1,629 manatees 2000 2,222 manatees 2001 3,276 manatees During the most recent statewide synoptic survey, portions of Brevard County were observed in five counts made during January 5, 6, and 7, 2001. Of the 591 manatees observed in Brevard County on January 6, 2001, 457 manatees were adjacent to Florida Power and Light Company's thermal discharge, 38 manatees were in Sebastian River, 16 manatees were in Berkley Canal System, and 8 manatees were along the east Banana River shoreline on the southeastern extension of Merritt Island. In addition to statewide surveys, targeted aerial surveys in specific areas are used to establish manatee distribution and relative manatee abundance. These types of surveys are used by the FWCC in assessing manatee use of an area and then establishing manatee protection regulations. The most recent, comprehensive FMRI aerial survey in Brevard County consisted of 45 flights between September 1997 and September 1999. A standardized flight path designed to cover most probable manatee habitats was flown over Brevard County at least once per month during the two-year period at an altitude of approximately 500 feet (except for June 1999, where excessive smoke covered the area); the only area of the county not covered at all was restricted airspace associated with the Kennedy Space Center Complex. The highest number of manatees counted during this survey was 790 manatees in March 1999. General Description of Brevard County. Located in east central Florida, Brevard County is approximately 72 miles north-south and approximately 20 miles east-west. The west boundary of the county is the St. Johns River; the east boundary is the Atlantic Ocean. The Indian River Lagoon in Brevard County extends north of the Kennedy Space Center, at the north end of the county, to Sebastian Inlet, at the south end of the county. Brevard County consists of two major landforms and two major surface waters. From east to west, the geographical features are the Atlantic Ocean, a barrier island running the length of the county, the Indian River Lagoon, and the mainland. Northern Brevard County contains two other major geographical features. The barrier widens to form the Canaveral Peninsula on the east and Merritt Island on the west. Merritt Island is bordered by the Indian River on the west; the Banana River on the east; and the Mosquito Lagoon on the north. At the southern end of Merritt Island, the Banana River joins the Indian River. Besides Sebastian Inlet at the southern boundary of the county, the only navigable connection between the Indian River Lagoon and the Atlantic Ocean is at Port Canaveral. Port Canaveral cuts across the Canaveral Peninsula; along the west shoreline, the Canaveral Locks permit vessels to pass from the Port into the Banana River. The Mosquito Lagoon, Indian River and Banana River are located in a transitional zone between the temperate and tropical zones and form one of the most diverse estuaries in North America. The Indian River Lagoon varies from 0.5 to 5 miles in width and has an average depth of one meter (39.4 inches). The Indian River Lagoon system is not subject to significant periodic lunar tides. The water depths are depicted as mean lower low water, while the shorelines are represented in terms of approximate mean high water. In the lagoon system in Brevard County, the relative water levels rise and fall as influenced by wind, rainfall, storms, and tides. Expert witnesses with local knowledge of the waters acknowledged the variation in water level or relative depth and testified that the water level fluctuates in the Indian River Lagoon by more than three feet and fluctuates by two or two and one-half feet or greater annually. The Indian River Lagoon contains extensive sea grass beds, which are the preferred food for manatees. A bathymetric survey commissioned by the St. Johns River Water Management District determined the acreage of submerged land within the lagoon that can be potentially vegetated with submerged aquatic vegetation at a depth of six feet below mean sea level. Brevard County is the hub of the Atlantic Coast manatee population with a large year-round and a large migratory transient manatee population present throughout the year. THE MANATEE The West Indian manatee (Trichechus manatus) is one of endangered marine mammals in coastal waters of the United States. The West Indian manatee is presently classified as an "endangered species" by the federal Endangered Species Act and has protected status under the Marine Mammal Protection Act. The West Indian Manatee is one of the four living species of the mammalian Order Sirenia, the other three are the West African manatee, the Amazonian manatee and the dugong; the fifth species, Stellar's sea cow, was hunted into extinction. In the southeastern United States, manatees are limited primarily to Florida and Georgia and this group forms a separate subspecies called the Florida manatee (T. manatus latirostris). The Florida manatee (hereinafter "manatee") is a migratory species with a large range of movement along the Atlantic and Gulf Coasts of the United States. During the winter, cold temperatures keep the population concentrated in peninsular Florida, but during the late spring and summer they expand their range and are seen infrequently as far north as Rhode Island, and as far west as Texas. Manatees demonstrate "site fidelity" with some individual mammals adjusting their behavior to take advantage of changes in the availability of resources. Manatees often return to the same winter thermal refuges and the same summer habitats year after year. Manatees prefer water temperatures above 68 degrees F and when ambient water temperatures drop below 68 degrees, they seek warm water refuges, such as spring-fed rivers and power plans discharge outs. Florida Power and Light Company and Reliant Energy Power Plants and the Sebastian River are the primary warm water refuges sought by manatees in Brevard County. For feeding, resting, cavorting, mating and calving, manatees prefer shallow sea grass beds in coastal and riverline habitats with ready access to deep channels, particularly near the mouths of creeks, embayments and lagoons. Manatees sometimes prefer vegetation growing along the banks of waterways, instead of submerged or floating aquatic vegetation. Manatees seek and find sources of fresh water for drinking. In brackish or estuarine environment, they locate fresh water sources, either natural or artificial. They have been observed drinking fresh water at marinas, from air conditioning condensate discharge, from pockets of fresh water floating on the surface of the saltier water, from storm water outfalls and from springs. Typically, six-to-eight hours per day are spent on feeding, usually at one-hour intervals. Intermittently, between two and 12 hours per day are spent resting or sleeping either at the surface of the water or on the bottom. Time not devoted to feeding or sleeping is spent in traveling, socializing or exploring during both day and nighttime hours. The basic social unit consists of a female manatee and her dependent calf. Manatees, apart from winter aggregations at warm water resources and transient mating herds, are semi-social or mildly social mammals. Manatees usually prefer to swim below the surface at one to three meters (3.28 to 9.84 feet) depth, surfacing every few minutes to breathe. They typically have a swimming cruising speed between four and ten KM/HR (2-6 MPH), but can swim in short bursts at up to 25 KM/HR (15 MPH). Manatees have been seen in shallow waters with their backs and heads out of the water and on occasion have been observed fully or partially out of the water to feed or escape pursuing male manatees. Female manatees reach sexual maturity by age five years and males at the age of three to four years. Mating occurs when estrous females are successfully approached by dynamic epherimal mating herds of between five and 20 males (lasting up to four weeks). Female manatees will swim to very shallow water when pursued by mating herds of males as a preventive measure from mating. Manatees have a low reproductive rate and a long life expectancy. Manatee's gestation period is 11 to 14 months with usual birthing of one calf. Dependent calves remain near their mother's side from one to two years, swimming parallel to its mother, directly behind her flipper. Life expectancy for a manatee is in excess of 50 years. A significant decrease in adult survivorship due to, among other things, watercraft collisions could contribute to a long-term population decline. The manatee population in Florida has shown yearly increases resulting in more manatees now than there were in 1976 in the areas of Brevard County that are subject to the Proposed Rules. MANATEE PROTECTION PLANS The United States Fish and Wildlife Service developed an initial recovery plan for West Indian manatees in 1980, primarily for manatees in Florida. The plan was revised in 1989 and 1996. A third revision to the Recovery Plan was noticed for public comment in November 2000, and in July 2001. The recovery plans hereinabove recognized the major human-related cause of manatee mortality is collisions with watercraft. The existing and draft recovery plans state: Because watercraft operators cannot reliably detect and avoid hitting manatees, federal and state managers have sought to limit watercraft speed in areas manatees are most likely to occur to afford boaters and manatees time to avoid collisions. Avoidance technology research is ongoing for deterrent devices designed to "avoid collisions"; however, no device or combination of devices has gained acceptance and approval by the Marine Biological Scientific Community. The Florida Legislature has designated the entire State a refuge and sanctuary for the manatee--the Florida State marine mammal. Section 370.12(2)(b), Florida Statutes. HISTORY OF MANATEE PROTECTION IN BREVARD COUNTY The Florida Legislature initially authorized the adoption of manatee protection rules for Brevard County effective July 1, 1978, when it required the (former) Florida Department of Natural Resources to adopt rules regulating the speed and operation of motorboats between November 15 and March 31, 1978, in those portions of the Indian River within 3/4 mile of the then Orlando Utilities Commission (now Reliant) and Florida Power and Light Company power plant effluents. These rules became effective on March 19, 1997 (former Rule 16N-22.06, Florida Administrative Code ("Brevard County Manatee Protection Rules" or "BCMPR"). In 1989, a strategy to improve manatee protection in 13 key counties was approved by the Governor and Cabinet. The strategy called for development of manatee protection plans, for boat facility siting criteria, for priority land acquisition of critical manatee use areas, and improved aquatic preserve management for sea grass protection. Guidelines for implementation included new or expanded speed zones, refuges or sanctuaries for the regulation of boat speeds in critical manatee areas. Financial assistance was given Brevard County for its manatee protection plan in 1993. After creation of the FWCC, effective July 1, 1999, the BCMPR and other manatee protection rules were transferred from Florida Department of Environmental Protection (FDEP) to the FWCC, and the Secretary of State renumbered the prior rules to Chapter 68C-22, Florida Administrative Code. In 1994, FDEP amended BCMPR to establish manatee protection zones in the Canaveral Barge Canal and portions of adjacent areas of the Indian and Banana Rivers; to expand the existing "slow speed" zone in Sykes Creek (north of "S Curve") to include the channel; to establish a maximum 25 MPH zone in the Sykes Creek channel between Sykes Creek Parkway and the "S Curve"; and to renumber and correct map inconsistencies. This site- specific rule-making action was taken in response to proposed additional threats to manatees resulting from development of Abby Marina (now Harbortown Marina), pending completion of Brevard County comprehensive countywide manatee protection plan. In 1998, FDEP amended the BCMPR to establish seasonal "motorboats prohibited" and "no-entry" zones at the then Orlando Utilities Commission's (now Reliant) power plant and a seasonal "no-entry" zone at Florida Power and Light Company's power plant. THE PROPOSED MANATEE PROTECTION RULE AMENDMENTS FOR BREVARD COUNTY 1906 Section II - Proposed Rules THE FULL TEXT OF THE PROPOSED RULES IS: (Substantial rewording of Rule 68C-22.006 follows. See Florida Administrative Code for present text.) 68C-22.006 Brevard County Zones. The Commission hereby designates the waters within Brevard County, as described below, as areas where manatee sightings are frequent and where it can be assumed that manatees inhabit on a regular, periodic or continuous basis. The Commission has further determined that a likelihood of threat to manatees exists in these waters as a result of manatees and motorboats using the same areas. The primary purpose of this rule is to protect manatees from harmful collisions with motorboats and from harassment by regulating the speed and operation of motorboats within these designated areas. A secondary purpose is to protect manatee habitat. In balancing the rights of fishers, boaters, and water skiers to use these waterways for recreational and commercial purposes (as applicable under 370.12(2)(j), F.S.) with the need to provide manatee protection, the Commission has examined the need for unregulated areas or higher speed travel corridors through regulated areas. Such areas or corridors are provided in those locations where the Commission determined, on the basis of all available information, (1) there is a need for the area or corridor and (2) the area or corridor will not result in serious threats to manatees or their habitat. Unregulated areas or higher speed corridors are not provided in locations where both of the above findings were not made. The following year-round and seasonal zones are established, which shall include all associated and navigable tributaries, lakes, creeks, coves, bends, backwaters, canals, and boat basins unless otherwise designated or excluded. As used in this rule, ICW means the Intracoastal Waterway. Access to the NO ENTRY and MOTORBOATS PROHIBITED zones designated in paragraphs (2)(a) and (b) will be provided in accordance with procedures set forth in subsection (4), hereunder, and applicable provisions of Rule 68C-22.003. NO ENTRY (November 15 – March 31) Indian River, Reliant Corporation Delespine Power Plant Area: All waters within the discharge canal of the Reliant Corporation Delespine power plant, and; All waters southerly of a line extending eastward from and following the same bearing as the southernmost seawall of the power plant discharge canal, with said line bearing approximately 70º, westerly of a line 250 feet east of and parallel to the western shoreline of the Indian River, and northerly of the jetty on the north side of the power plant intake canal. Indian River, FPL Frontenac Power Plant Area: All waters in the vicinity of the Florida Power and Light (FPL) Frontenac power plant southerly of a line connecting the northern guy wires of the power poles immediately north of the FPL Unit 2 discharge area from the western shoreline of the Indian River to the third power pole east of the western shoreline (approximately 1,650 feet east of the shoreline), and westerly of a line running from said third power pole to the easternmost point (approximate latitude 28º 28' 07" North, approximate longitude 80º 45' 19" West) of the jetty on the north side of the FPL intake canal. MOTORBOATS PROHIBITED (All Year, except as noted) Indian River, Reliant Corporation Delespine Power Plant Area: All waters in the vicinity of the Reliant Corporation Delespine power plant southerly of a line bearing 90º from a point (approximate latitude 28º 29' 41" North, approximate longitude 80º 46' 35" West) on the western shoreline of the Indian River 95 feet north of the northernmost seawall of the power plant discharge canal, westerly of a line 250 feet east of and parallel to the western shoreline of the Indian River, and northerly of a line extending eastward from and following the same bearing as the southernmost seawall of the power plant discharge canal, with said line bearing approximately 70º. This zone is in effect from November 15 through March 31. C-54 Canal: All waters of the C-54 Canal (South Florida Water Management District Canal 54) east of the spillway (approximate latitude 27º 49' 50" North, approximate longitude 80º 32' 24" West) and west of a line drawn perpendicular to the northern shoreline of the C-54 Canal at a point (approximate latitude 27º 49' 55" North, approximate longitude 80º 32' 00" West) on the northern shoreline 2,500 feet east of the spillway. IDLE SPEED (All Year, except as noted) Indian River, Power Plant Area: All waters west of the western boundary of the ICW channel, south of a line bearing 90° from a point (approximate latitude 28º 30' 13" North, approximate longitude 80º 46' 48" West) on the western shoreline of the Indian River approximately three-fourths of a mile north of the Delespine power plant discharge canal, and north of a line bearing 90° from a point (approximate latitude 28º 27' 27" North, approximate longitude 80º 45' 43" West) on the western shoreline of the Indian River approximately three-fourths of a mile south of the Frontenac power plant discharge canal, except as otherwise designated under (2)(a) and (b)1. This zone is in effect from November 15 through March 31. Banana River, Cape Canaveral Area: All waters north of a line bearing 270° from the southwesternmost point (approximate latitude 28º 23' 29" North, approximate longitude 80º 37' 10" West) of Long Point in Cape Canaveral to a point (approximate latitude 28º 23' 29" North, approximate longitude 80º 37' 49" West) in the Banana River approximately 3,500 feet west of Long Point, and east of a line bearing 331° from said point in the Banana River to a point (approximate latitude 28º 24' 16" North, approximate longitude 80º 38' 19" West) on the State Road 528 Causeway (west of State Road 401). Section II - Proposed Rules 1907 Banana River, Manatee Cove Area: All waters of Manatee Cove (on the east side of the Banana River, just south of State Road 520) east of a line at the mouth of the cove running between a point (approximate latitude 28º 21' 21" North, approximate longitude 80º 36' 52" West) on the northern shoreline and a point (approximate latitude 28º 21' 09" North, approximate longitude 80º 36' 51" West) on the southern shoreline. Turkey Creek: All waters of Turkey Creek north and east (downstream) of Melbourne- Tillman Drainage District structure MS-1 and south and west of a line at the mouth of Turkey Creek that runs from the southeasternmost point (approximate latitude 28º 02' 21" North, approximate longitude 80º 34' 48" West) of Castaway Point to the northeasternmost point (approximate latitude 28º 02' 14" North, approximate longitude 80º 34' 43" West) of Palm Bay Point. Sebastian Inlet Area: All waters of the cove on the northern side of Sebastian Inlet (commonly known as Campbell Cove) northwest of a line running between the two rock jetties at the entrance to the cove. Sebastian River Area: All waters of the North Prong of Sebastian River, and; All waters of the North Fork Sebastian River (also known as Sebastian Creek) and the C-54 Canal west of a north-south line from a point (approximate latitude 27º 50' 08" North, approximate longitude 80º 31' 02" West) on the northern shoreline of the North Fork Sebastian River at the intersection of the river and the North Prong and east of a line drawn perpendicular to the northern shoreline of the C-54 Canal at a point (approximate latitude 27º 49' 55" North, approximate longitude 80º 32' 00" West) on the northern shoreline 2,500 feet east of the spillway. SLOW SPEED (All Year) Mosquito Lagoon: All waters west of the ICW channel, south of the Volusia County/Brevard County line, and north of ICW channel marker “43,” and; All waters of Mosquito Lagoon (including the ICW channel) south of ICW channel marker “43,” southwest of a line commencing at ICW channel marker “43” and then running to ICW channel marker “45” and then on a bearing of 132° for a distance of 1,000 feet to the line’s terminus at a point in Mosquito Lagoon (approximate latitude 28º 44' 35" North, approximate longitude 80º 44' 35" West), and north of a line running from said point in Mosquito Lagoon on a bearing of 221° to the western shoreline of Mosquito Lagoon. Indian River, Turnbull Basin Area: All waters south and east of a line commencing at a point (approximate latitude 28º 44' 36" North, approximate longitude 80º 46' 19" West) on the eastern shoreline of Turnbull Basin (about one mile north of Haulover Canal) and then bearing 193° to a point 1,500 feet northwest of the ICW channel, then running in a southwesterly direction 1,500 feet northwest of and parallel with the ICW channel to a point (approximate latitude 28º 41' 22" North, approximate longitude 80º 49' 05" West) 1,500 feet northwest of ICW channel marker “12,” and then running in a southerly direction 1,500 feet west of and parallel with the ICW channel to the Florida East Coast Railroad Bridge, including all waters west of the ICW channel and south of an east-west line 1,500 feet north of the point where the Florida East Coast Railroad Bridge crosses over the ICW, but excluding the ICW channel as designated under (2)(e)2. Indian River, Titusville Area: All waters south of the Florida East Coast Railroad Bridge, east of the ICW channel, and north of an east-west line 1,200 feet south of the point where the Florida East Coast Railroad Bridge crosses over the ICW, and; All waters west of the ICW channel south of the Florida East Coast Railroad Bridge and north of the State Road 402 Bridge and Causeway. Indian River, State Road 402 (Max Brewer Causeway) to State Road 405 (NASA Parkway): All waters within 2,000 feet of the general contour of the western shoreline of the Indian River, excluding the ICW channel where the channel is less than 2,000 feet from the western shore; All waters within one mile of the general contour of the eastern shoreline of the Indian River south and east of a point (approximate latitude 28º 36' 04" North, approximate longitude 80º 44' 44" West) on the western shoreline of Peacock’s Pocket (northwest of Banana Creek), and; All waters south of an east-west line 3,400 feet north of the point where the State Road 405 Bridge crosses over the ICW, excluding the ICW channel as designated under (2)(e)3. Indian River, State Road 405 (NASA Parkway) to State Road 528 (Bennett Causeway): All waters north of an east-west line 3,000 feet south of the point where the State Road 405 Bridge crosses over the ICW, excluding the ICW channel as designated under (2)(e)3.; All waters west of the ICW channel and north of the overhead power transmission line that crosses the western shoreline of the Indian River approximately 1,200 feet north of State Road 528, excepting those areas otherwise designated for seasonal regulation under (2)(a), (b)1., and (c)1. when said seasonal zones are in effect; All waters south of said overhead power transmission line and west of a north-south line running through the second power pole east of the western shoreline; All waters within one-half mile of the eastern shoreline of the Indian River north of a point (approximate latitude 28º 25' 47" North, approximate longitude 80º 43' 24" West) on the eastern shoreline of the Indian River 1,500 feet south of the canal on the southern side of Meadow Lark Lane, including all waters of Rinkers Canal, and; All waters east of the ICW channel and south of the overhead power transmission line that crosses the eastern shoreline of the Indian River approximately 3,900 feet north of State Road 528. Indian River, State Road 528 (Bennett Causeway) to State Road 518 (Eau Gallie Causeway): All waters within 1,000 feet of the general contour of the western shoreline of the Indian River; All waters south of State Road 528 and within 1908 Section II - Proposed Rules 500 feet of the State Road 528 Causeway, within 500 feet of the State Road 520 Causeway, within 500 feet of the State Road 404 Causeway, and north of State Road 518 and within 500 feet of the State Road 518 Causeway; All waters within 1,000 feet of the general contour of the eastern shoreline of the Indian River between State Road 528 and State Road 520; All waters east of the ICW channel from State Road 520 to an east-west line 300 feet south of the southernmost point (approximate latitude 28º 19' 22" North, approximate longitude 80º 42' 00" West) of the spoil island east of ICW channel marker “80,” and; All waters within 500 feet of the general contour of the eastern shoreline of the Indian River south of the aforementioned east-west line and north of State Road 404 (Pineda Causeway). Indian River, State Road 518 (Eau Gallie Causeway) to Cape Malabar: All waters within 1,000 feet of the general contour of the eastern shoreline of the Indian River; All waters south of State Road 518 and within 500 feet of the State Road 518 Causeway and within 500 feet of the State Road 192 Causeway; All waters within 1,000 feet of the general contour of the western shoreline of the Indian River south of State Road 518 and north of the easternmost point (approximate latitude 28º 02' 24" North, approximate longitude 80º 34' 48" West) of Castaway Point (including all waters of the Eau Gallie River and Crane Creek), and; All waters south of said easternmost point of Castaway Point, north of Cape Malabar, and west of a line commencing at a point (approximate latitude 28º 02' 29" North, approximate longitude 80º 34' 38" West) in the Indian River 1,000 feet northeast of said easternmost point of Castaway point, then bearing 130° to the westernmost point (approximate latitude 28º 02' 15" North, approximate longitude 80º 34' 19" West) of the spoil site west of ICW channel marker “14,” then bearing 153° to the westernmost point (approximate latitude 28º 01' 32" North, approximate longitude 80º 33' 55" West) of the spoil site southwest of ICW channel marker “15,” then bearing 138° to the line’s terminus at a point (approximate latitude 28º 01' 12" North, approximate longitude 80º 33' 35" West) in the Indian River approximately 2,400 feet northeast of Cape Malabar. Indian River, Cape Malabar to Grant: All waters within 1,000 feet of the general contour of the eastern shoreline of the Indian River south of Cape Malabar and north of a point (approximate latitude 27º 55' 59" North, approximate longitude 80º 30' 30" West) on the eastern shoreline of the Indian River (north of Mullet Creek); All waters south of Cape Malabar, north of the spoil island between ICW channel markers “25” and “27,” and west of a line commencing at a point approximate latitude 28º 01' 12" North, approximate longitude 80º 33' 35" West) in the Indian River approximately 2,400 feet northeast of Cape Malabar, then bearing 157° to the easternmost point (approximate latitude 28º 00' 26" North, approximate longitude 80º 33' 13" West) of the spoil site between ICW channel markers “16” and “17,” then bearing 152° to the easternmost point (approximate latitude 27º 59' 21" North, approximate longitude 80º 32' 35" West) of the spoil island west of ICW channel marker “22,” then bearing 166° to the line’s terminus at the easternmost point (approximate latitude 27º 57' 50" North, approximate longitude 80º 32' 10" West) of the spoil island between ICW channel markers “25” and “27;” All waters within 1,000 feet of the general contour of the western shoreline of the Indian River south of said spoil island between ICW channel markers “25” and “27,” and north of ICW channel marker “35,” and; All waters west of the ICW channel between ICW channel markers "35" and “38.” Indian River, Grant to the Indian River County Line: All waters west of the ICW channel between ICW channel marker "38" and the Brevard County/Indian River County line, including those waters east of the centerline of the U.S. 1 Bridge over the Sebastian River, and: All waters within 1,500 feet of the general contour of the eastern shoreline of the Indian River, south of a point (approximate latitude 27º 55' 59" North, approximate longitude 80º 30' 30" West) on the eastern shoreline of the Indian River (north of Mullet Creek) and north of an east-west line running through ICW channel marker “59” (approximate latitude 27º 51' 38" North, approximate longitude 80º 28' 57" West), including those waters within 1,500 feet west of the westernmost edge of the Mullet Creek Islands, within 1,500 feet west of the westernmost edge of the islands south of Mathers Cove, within 1,500 feet west of the westernmost edge of Long Point, and within 1,500 feet west of the westernmost extensions of Campbell Pocket south to said east-west line running through ICW channel marker “59,” and; All waters of the Indian River and Sebastian Inlet east of the ICW channel, south of said east-west line running through ICW channel marker “59,” north of the Brevard County/Indian River County line, and west of a line 200 feet southwest of and parallel with the centerline of the State Road A1A Bridge, except as otherwise designated under (2)(c)5. and excluding the marked Sebastian Inlet channel. Sebastian River Area: All waters of the Sebastian River (including waters also known as San Sebastian Bay), the South Fork San Sebastian River (also known as St. Sebastian River, Sebastian River and Sebastian Creek), and the North Fork Sebastian River (also known as Sebastian Creek) within Brevard County west of the centerline of the U.S. 1 Bridge and east of a north-south line from a point (approximate latitude 27º 50' 08" North, approximate longitude 80º 31' 02" West) on the northern shoreline of the North Fork Sebastian River at the intersection of the river and the North Prong of Sebastian River. Canaveral Barge Canal: All waters of the Canaveral Barge Canal east of the general contour of the eastern shoreline of the Indian River and west of the general contour of the western shoreline of the Banana River. Sykes Creek and Kiwanis Basin: All waters of Sykes Creek and Kiwanis Basin south of the Canaveral Barge Canal and north of the centerline of State Road 520. Section II - Proposed Rules 1909 Newfound Harbor: All waters south of State Road 520 and within 1,000 feet of the State Road 520 Bridge and Causeway; All waters within 1,000 feet of the general contour of the western shoreline of Newfound Harbor north of the runway for the Merritt Island Airport (approximately one mile south of State Road 520), and; All waters within 1,000 feet of the general contour of the eastern shoreline of Newfound Harbor and an extension of said shoreline to a point 1,000 feet south of Buck Point. Banana River, North of State Road 528: All waters within 1,500 feet of the general contour of the western shoreline of the Banana River south of a point (approximate latitude 28º 26' 10" North, approximate longitude 80º 39' 35" West) on the shoreline near Kars Park on the boundary of the federal No Motor zone; All waters south of an east-west line running through the westernmost point (approximate latitude 28º 24' 42" North, approximate longitude 80º 38' 34" West) of the first spoil island north of the Canaveral Locks (commonly known as Ski Island), including those waters in Port Canaveral west of State Road 401, and; All waters east and south of a line commencing at the northernmost point (approximate latitude 28º 24' 44" North, approximate longitude 80º 38' 32" West) of Ski Island, then running to the southernmost point (approximate latitude 28º 24' 55" North, approximate longitude 80º 38' 31" West) of the second spoil island north of the Canaveral Locks, then following the eastern shoreline of said spoil island to its northernmost point, then bearing 6° to a point (approximate latitude 28º 25' 09" North, approximate longitude 80º 38' 29" West) in the Banana River underneath the overhead power transmission line south of the third spoil island north of Canaveral Locks, then following said transmission line (which is the boundary of the federal No Motor zone) in an easterly direction to the line’s terminus at a point (approximate latitude 28º 25' 16" North, approximate longitude 80º 36' 13" West) on the eastern shoreline of the Banana River. Banana River, State Road 528 to State Road 520: All waters south of State Road 528 and north of an east-west line 1,000 feet south of the point where the State Road 528 Bridge crosses over the main Banana River channel, except as otherwise designated under (2)(c)2.; All waters west of a line running from a point (approximate latitude 28º 24' 16" North, approximate longitude 80º 39' 30" West) on the State Road 528 Causeway east of the western State Road 528 Relief Bridge to a point (approximate latitude 28º 21' 26" North, approximate longitude 80º 39' 32" West) on the State Road 520 Causeway approximately 1,200 feet west of the water storage tanks, and; All waters south of a line bearing 270° from the southwesternmost point (approximate latitude 28º 23' 29" North, approximate longitude 80º 37' 10" West) of Long Point in Cape Canaveral to a point (approximate latitude 28º 23' 29" North, approximate longitude 80º 37' 49" West) in the Banana River approximately 3,500 feet west of Long Point, and east of a line bearing 174° from said point in the Banana River to a point (approximate latitude 28º 21' 28" North, approximate longitude 80º 37' 35" West) on the State Road 520 Causeway approximately 1,000 feet west of Cape Canaveral Hospital Complex. Banana River, Cocoa Beach Area: All waters south of State Road 520 and within 1,000 feet of the State Road 520 Causeway, excluding the main Banana River channel; All waters within 1,000 feet of the general contour of the western shoreline of the Banana River, south of State Road 520 and north of Buck Point and an extension of said shoreline to a point 1,000 feet south of Buck Point, excluding the main Banana River channel where the channel is less than 1,000 feet from the western shoreline, and; All waters east of a line commencing at a point (approximate latitude 28º 21' 25" North, approximate longitude 80º 38' 30" West) on the State Road 520 Causeway (approximately 2,000 feet east of the State Road 520 Bridge over the main Banana River channel), then bearing 190° to a point (approximate latitude 28º 19' 15" North, approximate longitude 80º 38' 55" West) in the Banana River approximately 1,900 feet west of the northwesternmost point of the Cocoa Beach Municipal Park, then bearing 270° to a point (approximate latitude 28º 18' 38" North, approximate longitude 80º 38' 55" West) in the Banana River approximately 1,700 feet west of the southwesternmost point of the Cocoa Beach Municipal Park, then bearing 171° for approximately 3,000 feet to a point (approximate latitude 28º 18' 07" North, approximate longitude 80º 38' 50" West) in the Banana River east of channel marker “15,” then bearing 124° to a point (approximate latitude 28º 16' 52" North, approximate longitude 80º 36' 45" West) in the Banana River 1,000 feet west of the eastern shoreline of the Banana River, then heading in a southerly direction 1,000 west of and parallel with the eastern shoreline of the Banana River to the line’s terminus at a point (approximate latitude 28º 15' 51" North, approximate longitude 80º 36' 38" West) in the Banana River near the northern boundary of Patrick Air Force Base. Banana River, South of Cocoa Beach to State Road 404 (Pineda Causeway): All waters south of an east-west line running through the southernmost point (approximate latitude 28º 16' 19" North, approximate longitude 80º 39' 25" West) of the more southerly of the two islands east of Macaw Way (on Merritt Island) and west of a line bearing 162° from said southernmost point to State Road 404; All waters south and east of the overhead power transmission line in the Banana River adjacent to Patrick Air Force Base, and; All waters north of the centerline of State Road 404 and within 2,000 feet of the State Road 404 Bridges and Causeway, excluding the main Banana River channel as designated under (2)(e)5. Banana River, South of State Road 404 (Pineda Causeway): All waters south of the centerline of State Road 404, including those waters east of a line bearing 270° from the southernmost point (approximate latitude 28º 08' 32" North, approximate longitude 80º 36' 15" West) of Merritt Island 1910 Section II - Proposed Rules (commonly known as Dragon Point) to the Eau Gallie Causeway, excluding the main Banana River channel as designated under (2)(e)5. 25 MPH (All Year) Mosquito Lagoon: All waters in the ICW channel south of the Volusia County/Brevard County line and north of ICW channel marker “43” (north of Haulover Canal). Indian River, Turnbull Basin and Titusville Area: All waters in the ICW channel southwest of ICW channel marker “1” (southwest of Haulover Canal) and north of an east-west line 1,200 feet south of the point where the Florida East Coast Railroad Bridge crosses over the ICW. Indian River, State Road 405 (NASA Parkway) Area: All waters in the ICW channel south of an east-west line 3,400 feet north of the point where the State Road 405 Bridge crosses over the ICW and north of an east-west line 3,000 feet south of the point where the State Road 405 Bridge crosses over the ICW. South Indian River Area: All waters in the ICW channel south of ICW channel marker “59” and north of the Brevard County/Indian River County line. South Banana River Area: All waters in the main Banana River channel south of a point in the channel 2,000 feet north of the State Road 404 Bridge, and north of a point (approximate latitude 28º 09' 15" North, approximate longitude 80º 36' 32" West) in the channel on the northern boundary of the local Idle Speed zone approximately 1,900 feet north of the Mathers Bridge. Commercial Fishing and Professional Fishing Guide Permits: The following provisions pertain to the issuance of permits to allow individuals engaged in commercial fishing and professional fishing guide activities to operate their vessels in specified areas at speeds greater than the speed limits established under subsection (2) above. Procedures related to the application for and the review and issuance of these permits are as set forth in 68C-22.003, Florida Administrative Code. Permits shall be limited as follows: Permits shall only be available for the zones or portions of zones described under (2)(d)1. through (2)(d)9., and (2)(d)13. through (2)(d)18. Permits shall not apply on weekends or on the holidays identified in s. 110.117, F.S. Permit applications may be obtained at the Commission’s Law Enforcement office at 1-A Max Brewer Memorial Parkway in Titusville or by contacting the Commission at Mail Station OES-BPS, 620 South Meridian Street, Tallahassee, Florida 32399 (850-922-4330). Access to the NO ENTRY and MOTORBOATS PROHIBITED zones is allowed for Reliant Corporation employees or their authorized agents (for the zones designated under (2)(a)1. and (b)1.) and for Florida Power and Light Company employees or their authorized agents (for the zone designated under (2)(a)2.) provided that entry into the zones is necessary to conduct activities associated with power plant maintenance, emergency operations or environmental monitoring. The Commission must receive notification of the activity prior to its commencement. In the event of an emergency activity, the Commission shall be notified no more than one week after the activity has been commenced. All vessels used in the operation or associated with the activity shall be operated at no greater than Idle Speed while within the zones and must have an observer on board to look for manatees. The zones described in 68C-22.006(2) are depicted on the following maps, labeled “Brevard County Manatee Protection Zones.” The maps are intended as depictions of the above-described zones. In the event of conflict between the maps and descriptions, the descriptions shall prevail. DATA SOURCES CONSIDERED BY FWCC IN PROMULGATING THE PROPOSED RULE FWCC's staff who were primarily responsible for the development of the recommended revisions to the BCMPR to the FWCC included: Scott Calleson, who holds a Bachelor of Science degree in Marine Science and a Masters of Science degree with emphasis on Environmental Planning and Natural Resource Management, and has worked with manatee protection rules since 1992; David Arnold, who holds both a Bachelor of Science degree in Biology and a Master of Science degree in Biological Oceanography, and who supervised the Department of Environmental Protection's marine turtle protection program prior to becoming Chief of the Bureau of Protected Species Management in 1995; and Dr. Charles Deutsch, who has both a Bachelor of Science and a Doctorate degree in Biology with specialization in biology of marine mammals and behavior, animal behavior and behavioral ecology, and worked for the United States Geological Survey (USGS) in a number of analyses of manatee radio tracking along the Atlantic Coast. The verbal, narrative and graphical presentations of the experts were relied upon in making recommendations to the FWCC for the proposed rule revisions. FWCC's staff gave good faith consideration to the experts' opinions, publications, articles, data analysis, and reasonable inferences and predictions. MANATEE MORTALITY DATA FWCC relied upon manatee mortality data in evaluating manatee inhabitation (Brevard County Mortality Information and Brevard County Misc. Information), including FMRI manatee salvage database for Brevard County from January 1974 to December 2000 (including carcass recovery location and cause of death). AERIAL SURVEY DATA In evaluating manatee inhabitation, FWCC relied upon manatee aerial survey data in existing manatee inhabitations. Included in this process were: information on aerial surveys performed for Kennedy Space Center by Dynamic Corporation; Geographic Information System information for FMRI's 1997-1999 Brevard County aerial survey along with data in "Seasonal Manatee Distribution and Relative Abundance in Brevard County, Florida, 1997-1999"; Geographic Information System data from earlier Brevard County aerial surveys; and aerial surveys conducted by the Florida Marine Research Institute and others. Aerial Surveys Aerial surveys have been conducted by the Florida Marine Research Institute and others using various techniques. One type of aerial survey technique is a statewide survey. These surveys are typically flown in the winter, after the passage of a cold front. Typical winter aggregation areas are included in these surveys. The synoptic surveys are used for monitoring winter aggregations of manatees. Population biologists working on manatee recovery view synoptic survey results as the best available information about the minimum estimated size of the manatee population in Florida at this time. The statewide synoptic survey data from the past several years is as stated in Finding of Fact 23 herein above. In addition to statewide surveys, targeted aerial surveys in specific areas are used to establish manatee distribution and relative manatee abundance. The commission in assessing manatee use of an area and then establishing manatee protection regulations uses these types of surveys. SYNOPTIC AERIAL SURVEYS Considered by FWCC was the statewide synoptic survey for the period 1991 to 2001. These surveys are used for monitoring winter aggregation of manatees and provide a minimum estimate of the number of manatees observed. Population biologists view synoptic survey results as the best available information source to estimate the minimum size of the manatee population in Florida at the present time. The statewide synoptic survey data for the years 1991-2001 are detailed in paragraph 22 herein above. The Berkeley Canal system location, where manatees were observed on January 6, 2001, has four connecting canals to the eastern shoreline of the Banana River; the northernmost connection is just south of the Pineda Causeway and the southernmost connecting canal is located about three and three-fourths miles to the south between Carter's Cut and the Mathers Bridge. The West Banana River shoreline locations where manatees were observed on January 6, 2001, is the Banana River Marina. MANATEE DISTRIBUTION AND RELATIVE ABUNDANCE Targeted aerial surveys in specific areas are used to establish manatee distribution and relative manatee abundance. They are used in assessing manatee use of an area and then in establishing manatee protection regulations in those areas. Forty-five flights between September 1997 and September 1999 are the most comprehensive and recent FMRI aerial surveys in Brevard County. Aerial surveys possess an inherent bias because the location of animals can only be seen during daylight hours and do not account for nighttime locations. FWCC's aerial survey data were presented in various forms: raw data entry sheets completed by the surveyors; a composite, GSI plot of the data points for Brevard County; small- format GIS plots of data points that depicted manatees seen by month; and small-format GIS plots of data points that depicted manatees seen during each flight, along a flight path. Before the 1997-1999 Bervard survey, relative abundance and distribution surveys for portions of Brevard County were conducted in late-1985 through early-1987. The 1985-87 Banana River surveys included only the area between Launch Complex 39B and Eau Gallie, but included portions of Canaveral Barge Canal, Sykes Creek and Newfound Harbor. Flights were flown over the Cocoa Beach area during morning hours for a nine-month period (March 3, 1990- November 27, 1990), and showed more than one manatee during each flight, with one exception on March 3, 1990. SATELLITE TELEMETRY DATA AND VHF RADIO TELEMETRY DATA The FWCC relied upon manatee telemetry data in evaluating manatee inhabitation for Brevard County. Included in the satellite and VHF radio telemetry data relative to inhabitation was a GIS database obtained from the "United States Geological Survey (USGS) Biological Resources Division, Florida Carribean Science Center, Sirenia Project, Gainesville, Florida," and reports authored by Dr. Charles Deutsch who analyzed the USGS data. The USGS Sirenia Project data analyzed by Dr. Deutsch were collected from May 1986 to May 1998, and included both VHF radio and telemetry and satellite telemetry data for the 78 manatees that were tagged for varying amounts of time during that period along the lower East Coast of the United States, excluding data for manatees that were born and raised in captivity. This data was considered by Dr. Deutsch as the best telemetry data available. Of the full USGS Sirenia Project data evaluated by Dr. Deutsch, 61 manatees were tracked at some time during the study period in Brevard County, including 16 manatees that were only tracked using VHF radio tracking and not satellite telemetry. The maximum number of tagged manatees observed in Brevard County during the study period was 12 manatees at one time. Dr. Deutsch opined that about one or two percent of the documented East Coast manatee sub-population was tracked each year. The radio telemetry data subsets from the Sirenia Project covered a ten-year period from May 1986, and included over 6,000 manatee observations for 54 individual tagged manatees. Of those 6,000 observation points, three-quarters (almost 5,000) were actual visual sighting of manatees made by persons on shore or in vessels. Of those visual sightings, approximately ten percent were made by non-government employees. The satellite telemetry data evaluated by Dr. Deutsch included data for 45-tagged manatees that was collected from April 1987 to May 1998, with over 34,000 location records of Class 1, 2, or 3 accuracy. Of the 61-tagged manatees that were observed in Brevard County during the 12-year study period, the median tracking period was 135 days, with some animals tracked for several years while others were tracked for shorter periods of time. Of the 61 manatees tracked in Brevard County, approximately one-half were fitted with radio or satellite telemetry transmitters (tags) while in Brevard County, the other half were tagged in different areas of northeast Florida, in southeast Georgia, or in southeast Florida. A majority of the animals tagged outside of Brevard County were observed in Brevard County, and Dr. Deutsch opined that this data demonstrated Brevard County to be the hub of manatee activity along the Atlantic Coast. MIGRATORY RANGE OF TAGGED MANATEES The size of the migratory ranges of tracked manatees varied with considerable variation of movement by individual manatees in Brevard County. Some manatees would spend eight months of the year near Canaveral Sewer Plant (Banana River) and spend each winter near Port Everglades (Ft. Lauderdale). Many tagged manatees displayed strong site-fidelity, returning to the same seasonal locations yearly while others did not. Telemetry data points are not precisely a depiction of the actual and true location of the manatee at the time of data transmission from the tag to the satellite. Services Argos, the company that administers the hardware, assigned 68 percent of the data points within 150 meters of the true location in class three locations. In 1994, USGS performed accuracy experiments in Brevard County of satellite telemetry and found location class 3 data points to be within 225 meters of the true location, and 95 percent within 500 meters of the true location. In addition to Dr. Deutsch's reports, FWCC considered various telemetry papers and publications pertaining to Brevard County: "Tagged Manatee Use of the Cocoa Beach/Thousand Island Area;" "Winter Movements and Use of Warm-water Refugia by Radio- tagged West Indian Manatees Along the Atlantic Coast of the United States;" and "Easton, Tagged Manatee Movement through the Canaveral Barge Canal, Brevard County Florida" (February 14, 1997). MANATEE SIGHTING DATA FWCC relied upon manatee sighting data in its evaluation of manatee inhabitation. Included in the sighting data was the Brevard County 2001 Rule Development and Trip Notes of February 6- 7, 2001; Sea Ray Boats, Inc. Water Test Re-Run Manatee Sighting Records for 2000-2001; Canaveral Barge Canal Boater Activity and Compliance Study; Sharon Tyson's Sykes Creek Observation Records; and cold-seasons sighting logs for the C-54 canal structure. STUDIES AND REPORTS PERTAINING TO MANATEE DISTRIBUTION, RELATIVE ABUNDANCE, HABITAT, BEHAVIOR, OR OTHER MANATEE INFORMATION. FWCC considered and relied upon the Brevard County Manatee Protection Plan that included an inventory and analysis section about manatees, analysis of manatee mortality data, manatee legislation and protection, law enforcement, habitat issues, existing boat facilities, Brevard County boating activity patterns, and an inventory of present manatee education programs. The existing Federal Manatee Recovery Plan, to which members of the Bureau of Protected Species and Florida Marine Research Institute contributed, was relied upon. SCAR CATALOG DATA FWCC considered and relied upon scar catalog data in evaluating manatee protection needs with Brevard County Misc. Information as the source provider. EXPERT OPINIONS FWCC relied upon expert opinions in evaluating manatee inhabitation. A staff meeting with manatee experts, as part of the process, included, but was not limited to, meetings with Jane Provancha and Sharon Tyson in December 2000, meetings and discussions with Dr. Charles Deutsch between November 2000 and May 2001, and various discussions with members of the federal Recovery Plan Team. OTHER AVAILABLE SITE-SPECIFIC INFORMATION FWCC considered site-specific information that was available, principally drafts of the Brevard County Manatee Protection Plan. FWCC also considered site-specific information about water skiing areas and prospective additional travel times in various waters proposed for new, or changed, regulations. DATA ANALYSIS Threat Analysis Rule 68C-22.001(3), Florida Administrative Code, contemplates a qualitative assessment and exercise of discretion by taking into consideration a balancing of manatee protection needs, including an assessment of relative threats to manatees, with the right of boaters, fishers and water skiers. In assessing where threats to manatees may exist from motorboats, the manatee death database provides information on confirmed interactions, such as locations where manatee carcasses have been recovered. Manatee deaths, carcass recovery and confirmed interactions locations are maintained in FMRI's database. From January 1974 to December 2000, 728 manatees died in Brevard County and 184 of those deaths were because of interactions with watercrafts. Watercraft related deaths account for 23.5 percent of all manatee deaths recorded in Brevard County between 1974 and 2000. Approximately 19 percent of all watercraft related deaths of manatees in Florida have occurred in Brevard County. FWCC has determined that manatee death from watercraft interaction is due to blunt trauma more than 50 percent of the time. Deaths from propeller cuts account for less than 50 percent. Often injury instead of immediate death from motorboat strikes is the case. Many manatees have scars from previous sub- lethal motorboat strikes, and manatees have been observed with more than 30 different strike patterns. Where the cause of death is classified as watercraft related, carcass recovery may or may not be where the collision occurred depending upon the acuteness of the injury at the time of collision. Acuteness of the injury, wind, current, tide, and decomposition all affect the location of the carcass at the time of salvage. Additionally, operation of motorboats can disrupt essential manatee behaviors such as warm water sheltering, feeding, sleeping, mating, and nursing. This harassment can lead to cold-related illnesses and increase mortality risk by driving manatees from warm water refuges. The increase in the Atlantic Coast manatee population and the increase of the number of boat registrations result in an increase in the threat of harmful collisions between boats and manatees. Geographic Scope of Threat Analysis Section 370.12(2)(m), Florida Statutes, does not specifically describe the geographic scope of the FWCC's evaluation of "other portions of state waters" for manatee sightings and assumed inhabitation on a periodic or continuous basis. Subsection 370.12(2)(g), Florida Statutes, suggests that the evaluation of manatee sightings is appropriate for large portions of navigable waterways, such as the Indian River between St. Lucie Inlet and Jupiter Inlet. A "waterway" is generally defined as "a navigable body of water." (Webster's Ninth New Collegiate Dictionary, p. 1333.) Rule 68C-22.001(3)(a)2.f., Florida Administrative Code, contemplates a qualitative assessment of the "likelihood of threat" to manatees. The only reference is to the "characteristics of the waterway in question." The rule does not mandate the geographic scope of a "threat evaluation." The FWCC analyzed various data on different scales depending upon the nature of the inquiry - the evaluation of sighting "frequency" generally considered a large geographical area such as a section of a river. Conversely, the regulatory alternatives to protect manatees were evaluated at a smaller or finer scale. The Commission also considered segments of waterways divided by causeways or natural barriers. The Commission considered research that divided Brevard County (north of Eau Gallie) into 12 zones for purposes of analysis. In the Brevard County Manatee Protection Plan, the waterways were analyzed in terms of seven "planning zones," to include review of physical characteristics such as bathymetry and sedimentological conditions, shoreline conditions, and water quality; Manatee Habitat Features, including sea grass, mangrove/salt marsh, freshwater sources, warm water refugia, calving and resting areas, feeding areas, travel corridors, and habitat protection; Manatee Data including manatee abundance and distribution and manatee mortality; boat facilities; boating activity patterns; waterspouts areas; and manatee zones. The Commission's consideration of waterway characteristics and manatee behavior during the Brevard County rule-making process, including the geographic scope of manatee inhabitation and threat from watercraft, was reasonable and consistent with the approach taken by other resource management agencies and researchers as contemplated by the statutory purpose. Proximity and Degree of Known Boating Activities FWCC evaluated available boating activity information in assessing threat. Staff considered the general analysis of boating activity and detailed analysis of boating activity in specific portions of Brevard County as provided in the County's MPP; included therein were maps that show locations of the County's 72 marinas and 65 boat ramps, of which 27 are public ramps. Also considered was the study of Brevard County-Wide Boating Activity by Dr. J. Morris, of the Morris of Florida Institute of Technology. Dr. Morris' inquiry resulted in the following specific finding. First, Brevard County residents are the primary ones who launch at boat ramps, followed by residents of Orange, Osecola, Seminole, Indian River and Volusia counties. Second, the Inter Costal Waterways experiences increases in transient traffic during late fall and winter months, including out-of-state boats. Third, Class One boats (16 to 25 feet) are the most observed type, followed by Class A (less than 16 feet) vessels. Fourth, most boating activity occurs during weekends. Fifth, the greatest concentrations of boats were in specific areas such as NASA causeway (SR 405, Indian River), East Canaveral Barge Canal, SR 520 and the Banana River (the Merritt Island Causeway), the Pineda Causeway (SR 404, Banana River), the Melbourne Causeway (Indian River), near Grant Island Farm, the Sebastian River and the Sebastian Inlet. Dr. Morris concluded that the boating public preferred to cruise the waters of the lagoons with the marked channels and use Indian and Banana Rivers as highways for recreational boating purposes. The United States Fish and Wildlife Service (USFWS) closed a portion of the northern Banana River within the Merritt Island National Wildlife Refuge to public boat entry, limiting public entry to wading or by non-motorized vessels. The closed area has one of the largest concentrations of manatees in the United States, and recently has been the most important springtime habitat for the east coast manatee population. As a result of the March 1990 closing to motorized boats, an average increase of manatee use observed during the summer months in the area increased by 60 percent. The increased use is attributed to improved habitat quality aided by the lack of human disturbance and reduced propeller scarring of sea grass. In December of 1994, Dr. Morris submitted a report, "An Investigation of Compliance to Boat Speed Regulations in Manatee Protection Zones in Brevard County, Florida." This report contained an analysis from on-water and aerial observations in both "slow speed" and "idle speed" zones in various areas of Brevard County for a one-year period of April 1993 to April 1994. At Mosquito Lagoon, of 1,214 boats observed, speeds were clocked for 98 percent of the boats and 11 percent of those exceeded the posted Inter Costal Waterways 30 MPH speed limit, all of which were recreational boats. At the Indian River site between Grant and Sebastian, 2,511 boats were observed, speeds were clocked for 97 percent of the boats and 16 percent of those exceeded the posted ICW 30 MPH speed limit. In posted "slow speed" zones outside the ICW channel, 25 percent of boats observed underway were deemed non- compliant with the speed zone limitation. Of those non-compliant Class A powerboats, the violators were typically personal watercrafts ("Jet Ski" type vessels.) A detailed boater activity study was made of the Canaveral Barge Canal and Sykes Creek Area. The study found, in part, that: highest boating use occurred during holidays, except during bad weather; most use occurred on weekends; and in Canaveral Barge Canal and Sykes Creek 63 percent of the vessels were Class 1 boats and 74.3 percent of the vessels were Class 2 or Class 3 boats. INCREASED LEVEL OF BOATING ACTIVITY IN BREVARD COUNTY In general, the level of boating activity in Brevard County continues to increase with the increasing population, launching facilities, and boat registrations in Brevard County and nearby counties, including Orange and Seminole counties. In 2000, 34,316 vessels were registered in Brevard County. In the preceding year there were 31,842 vessels registered. In 1995, 28,147 boats were registered and in 1987, 23,352 boats were registered in Brevard County. In 2000, Florida registered 840,684 recreational vessels, an increase over the 695,722 vessels registered in 1994. Boating accidents increased with the increased registration of vessels with Brevard County ranking 10th out of the state's 67 counties with the number of boating accidents. Brevard County, since mid-1990's, has registered an increased number of "flats skiffs" which are shallow draft, low profile motorboats capable of speeds up to 50-60 MPH while operating in shallow (about 1 foot) water and often used for sight-fishing in shallow sea grass flats. SEASONAL AND/OR YEAR-ROUND PATTERNS OF MANATEE USE AND THE NUMBER OF MANATEES KNOWN OR ASSUMED TO OCCUR IN, OR SEASONALLY USE THE AREA FWCC staff evaluated whether seasonal restrictions could or would be effective. Staff concluded that the only seasonal regulation of motorboats justifiable by the data was at the power plant discharges in the Indian River. At those locations, extreme concentrations of manatees are regular during the cold season. Year-round manatee protections were proposed for this area, but they would have to be more restrictive during the winter months. During the coldest periods of winter, following a strong cold front, manatees have been observed in large concentrations in: the power plant discharges at Florida Power and Light Company's Indian River plant and at the adjacent Reliant Energy Plant and the Sebastian River Canal. The congregation of manatees at thermal refuges on cold winter days was not for the duration of the winter season. They have been known to leave the thermal refuge for a part of a day, a day, or for many days at a time. Sharon Tyson, observer, performed a detailed Brevard County Manatee Photo-Identification Project during late 1999 and early 2000 at the Brevard County power plants, and documented a number of manatees in the FPL discharge zone between December 24, 1999, and March 4, 2000. During that period the number of manatees in the zone varied greatly, through late-December to mid-January (from 7 to 57 manatees). On January 16, 2000, no manatees were present. On January 17, 2000, 10 manatees were present. On January 23, 2000, 29 manatees were counted. Two weeks later, February 6, 2000, 111 manatees were present. Similar sightings made at the C-54 Canal Structure (near Sebastian Creek), during the same time-period, found as few as 11 manatees to as many as 90 manatees. Apart from the extreme concentration of manatees during extremely cold periods, manatees are distributed through the county waterways during each season of the year. The 1997-1999 Brevard County Aerial Survey GIS Plots gave a clear representation of year-round manatee distribution patterns varying greatly. MANATEE MORTALITY TRENDS WITHIN THE AREA Only in rare cases is the approximate or actual location of a manatee and motorboat collision known. The FWCC considered and relied upon a review of the general trend of watercraft-related (and other) mortality County-wide to assess a generalized increased mortality trend. In doing so as part of the rule-making process, FWCC reviewed total manatee mortality for Brevard County for the period for which records existed from 1974 to 2000. That data base source indicated increasing watercraft mortality in recent years. FWCC evaluated manatee salvage data for January-March 2001 and preliminary information for April-May 2001. Staff employee, Scott Calleson's working file mortality information was reviewed and considered as was Dr. Ackerman's "Mortality Rates White Paper," which concluded that human-caused manatee mortality levels were at an unsustainable rate in the Atlantic, Brevard County, Tampa Bay, and Southwest Florida Regions. The Florida Inland Navigation District provided documentation that was considered in the FWCC rule making that included a regional evaluation of "Watercraft Related Manatee Deaths in the Nine Critical Counties of FIND" from 1990-1999. Of these nine critical east coast counties, Brevard County had the highest mortality trend. During the last two-to-three years, there has not been a clear trend of increased manatee mortality in Brevard County, but the number of watercraft-related mortalities is capable of being reduced, in part, through improved regulations. Historical manatee mortality data for Brevard County from 1977 through 2000 demonstrates a clearly increasing trend in watercraft-related manatee mortality. For each five-year increment, water-related manatee mortality has increased as follows: from 1977-1979 there were an average of 1.9 water-related mortalities/year; 1980-1985 there were 4.6 mortalities/year; 1986-1990 there were 7 mortalities/year; 1991-1995 there were 8.8 mortalities/year; and 1996-2000 there were 11.8 mortalities/year. EXISTENCE OF FEATURES WITHIN THE AREA THAT ARE ESSENTIAL TO THE SURVIVAL OF, OR KNOWN TO ATTRACT, MANATEES SUCH AS SEAGRASSES, FAVORABLE WATER DEPTHS, AND FRESH OR WARM WATER SOURCES Dr. Deutsch stated that his telemetry analysis indicated that the most important habitat correlation for Brevard County manatees was with sea grass, and in particular, often with outer edge of sea grass beds. Manatees prefer feeding on submerged, emergent and floating vegetation, generally in that order. Manatees extensively use Brevard County sea grass beds for feeding. Sea grass coverage is depicted on the Florida Department of Environmental Protection's Boater's Guide to Brevard County, which has no date, but was prepared by the DEP. Sea grass coverage in 1989 is depicted in the 2000 maps prepared by the STMC, using the Atlas of Marine Resources, Versions 1.2 and 1.3b. The most recent St. Johns River Water Management District sea grass coverage data for the Indian River Lagoon indicates a strong correlation between sea grass coverage in waters with an average depth of 66.93 inches (1.7 meters) or less. As of 1992, of the estimated 46.190 acres of sea grass in Brevard County, nine percent of the sea grass suffered light scarring from boat activity; 4.2 percent of the sea grass suffered moderate scarring; and 13.4 percent of the sea grass suffered severe scarring. Areas with boat scarring of sea grass included a number of areas that are included within proposed "slow speed" zones: the eastern portion of Turnbill Basin; the eastern shoreline of the Indian River between the NASA railroad bridge and Rinkers Canal; the Banana River around Manatee Cove and south of the City Golf Course; the northwest part of Newfound Harbor; and the western shoreline of the Banana River, between Newfound Harbor and Pineda Causeway. The location of the proposed manatee protection zones corresponds well to the location of sea grass beds, deeper waters and channels adjacent to sea grass beds or established migratory routes, and fresh warm water sources. FAVORABLE WATER DEPTHS Dr. Deutsch stated that his telemetry analysis indicated that bathymetry is an important habitat correlate for Brevard County. Generally, tagged manatees were observed in the area from a two-meter (6.65 feet) depth contour to the shoreline. FWCC consideration of "favorable water depths" took into account the fact that water levels fluctuate in the Indian River Lagoon. However, unlike many coastal areas of Florida, the Indian River Lagoon does not experience significant daily tidal fluctuation. On an annual basis, however, the water level fluctuates about 2.5 to 3 feet in response to environmental conditions. It was determined to be impractical to amend manatee protection rules (and to move regulatory signs implementing the rules) in response to changing water levels. Manatees usually swim between one to three meters (3.28 to 9.84 feet) below the surface, surfacing every few minutes to breathe, and typically feed at just below the surface to a depth of three meters. Manatee experts, including persons with extensive experience observing manatee behavior in Brevard County, all testified that manatees used areas where the water level at the time was less than three feet for mating, feeding, fleeing a pack of male manatees, and resting. The FWCC used a bathymetric survey prepared on behalf of the St. Johns River Water Management District for purposes of establishing preferred sea grass habitats during the rule-making and considered the bathymetry in conjunction with other data to predict areas where manatees are likely to inhabit. The St. Johns District advised the FWCC staff that the 1.7-meter depth on its bathymetric survey was the rough depth limit for sea grass, and provided the FWCC staff with a GIS file on the bathymetric survey at 0.3-meter depth intervals for most areas, although the approximate sea grass contour was shown as 1.5 to 1.7 meters. Surveys are tied to a horizontal datum and a vertical datum. A survey depicts the three-dimensional lagoon basin, part of the spheroid planet Earth, on a two-dimensional map. The hydrographic survey data used by the FWCC in the rule-making was based upon a survey tied to a horizontal datum - North American Datum (NAD) 83/90; and a vertical datum - North American Vertical Datum of 1988 (NAVD-88). The horizontal and vertical accuracy of the survey differs. Positional accuracy of horizontal (e.g. shorelines) points is within 1 to 5 meters (3.28 to 16.4 feet). Vertical accuracy of depth data points averages within .03 feet. The hydrographic survey states that it is not to be used for navigation - - "The use of NAVD-88 for the bathymetric survey gives the impression of deeper water than is actually present within the lagoon since the "0" contour of NAVD-88 is located on dry land approximately 1 foot above the ordinary water line." Manatee distribution from aerial surveys and 1992 bathymetry data was graphically depicted by the STMC and confirms manatee use of areas proposed for regulation in the proposed rules. FRESH WATER SOURCES FWCC considered and relied upon major fresh water sources that have been historically used by manatees such as: Turnbull Creek; Titusville Marina/POTW; Addison Canal; the two Indian River power plants; two wells along the eastern shoreline of the Indian River approximately two miles south of Rinkers Canal; the intersection of Bacardi and Dakar Drive in Sykes Creek; the Cape Canaveral POTW (sewer plant); the Banana River Marina; the outfall into the Indian River from the east shore of Merritt Island westerly of the south end of Newfound Harbor; the Indian River Isles; the Eau Gallie River; Crane Creek; Turkey Creek; and the Sebastian River. Also considered were less significant sources of fresh water found at many marina basins, at the Sear Ray Boats, Inc. facilities and in residential canals. WARM WATER SOURCES FWCC considered major warm water sources in the two Indian River power plants and the Sebastian River Canal. Minor sources of warm water include deeper water and areas with artesian springs such as: Port Canaveral; a basin off Wynar Street in Sykes Creek; the Banana River Marina; and the Berkeley Canals. CHARACTERISTICS OF THE WATERWAY IN QUESTION IN RELATION TO KNOWN BOATING ACTIVITY PATTERNS FWCC considered, as its basic source document, Morris' Final Report for Brevard County Boating Activity Study. Boating activity patterns in Brevard County are dependent upon weather, economic conditions, and other factors. Larger motorboats (including tug/barge combinations) are constrained in movement to deeper water--in some areas, primarily within marked or maintained navigation channels including the Canaveral Locks, Canaveral Barge Canal, ICW, and Banana River main channel. In the Indian River, south of the NASA railroad bridge, the deeper area outside of the marked channel widens to between half-a-mile to a mile with depths ranging from seven to 12 feet MLLW, all the way to Rock Point, just north of Grant. For most of the length of the County, larger boats have sufficient water depth to travel adjacent to the ICW channel. Waters outside the main channel in the Banana River are relatively shallow. The Canaveral Barge Canal is dredged to maintain a depth of approximately 15 feet. Barges and escorting tugs navigate through the Canaveral Locks and into the ICW. Some barges proceed northward from the Canaveral Locks into the Banana River channel to make deliveries to the Space Center, according to the Lockmaster, Mr. Querry. Sea Ray Boats, Inc.'s, design and production facilities located along the Canaveral Barge Canal use the Canal to access testing areas to the west in the Indian River ICW, to the east in the Banana River channel, and in the Atlantic Ocean. Limited retests are permitted in an area adjacent to the Canaveral Barge Canal facilities. Recreational motorboats and personal watercrafts can be operated outside of marked channels. Some of these recreational motorboats can navigate "on plane" and up to 60 MPH in water about one-foot deep. Motorboat users engage in a variety of activities having differing operational patterns. Fishers might prefer to travel at relatively high speed enroute to preferred fishing areas, and then operate with a push pole, trolling motor or adrift, in order to hunt certain species of fish. If no fish are located, then high-speed operation to another spot is used, repeating the pattern of locating fish by sight. Water-skiers usually operate at high speed in a relatively small area, usually protected from the wind, and often located near an island or park. BOAT-MANATEE INTERACTIONS FWCC considered that manatees display varying reactions to motorboats. Higher speed motorboat operation in relatively shallow water presents a greater threat to manatees than operation at slow speed or idle speed or than operation in relatively deeper waters, since manatees have fewer opportunities to avoid the collision. Manatees can swim or rest at the surface or underwater and must come to the surface to breathe air every two to three minutes for smaller, active manatees and up to 20 minutes for large, resting manatees. Their general cruising speed is two to six miles per hour, but they can travel at short bursts up to 15 MPH. Boats operated at "slow speed" vary in miles-per-hour over the bottom within a range of about seven to eight miles-per- hour. At "slow speed," the manatee and vessel operator have more time to avoid collision, or the manatee can avoid serious blunt trauma injury from collisions with most vessels. The ability of manatees to avoid being hit by motorboats has diminished in Brevard County as a result of an increase in the manatee population, increase of motorboats, increase in boating access points, and development and use of faster boats that operate in less-predicable (non-linear) patterns in relatively shallow waters where manatees often feed on submerged vegetation. TESTIMONY REGARDING MOTORBOAT-MANATEE INTERACTION Officer Dennis Harrah, qualified as expert in boating safety, marine law enforcement, and local knowledge of the waterways of Brevard County, testified that "slow speed" zones provide greater reaction time for the vessel operator to avoid collision than unrestricted speed areas and than the "25 MPH maximum speed" areas. He further testified that "idle speed" zones provide greater reaction time for vessel operators to avoid collision than "slow speed" areas. Dr. John Reynolds, qualified as expert in marine mammal conservation and policy, manatee biology and behavioral ecology of marine mammals, opined, based on frequent observation of motorboat-manatee interactions, review of videotapes of such interactions, and review of studies on the subject, that there is an increased threat to manatees associated with boats that operate in planing speeds as opposed to slow speeds. His opinion is based, in part, on "common sense" that objects moving faster have greater momentum and therefore greater magnitude of impact, and on the reduced reaction time of both vessel operators and manatees to avoid collision. Dr. Reynolds was not aware of any evidence to suggest that the majority of watercraft strikes to manatees are from vessels operating at "slow speed," and it is his belief that "a good percentage of manatee mortality was from fast-moving vessels." Ms. Spellman, qualified as expert in marine biology and in manatee rescue and salvage, testified that she had observed considerable variability in manatees' reactions to kayaks, canoes and windsurfers, including manatees approaching the vessel, manatees not reacting at all, and manatees swimming away. She has observed manatee reactions to small motorboats as highly variant, depending upon the animal, including: swimming under a slow-moving motorboat, moving just as a motorboat approaches at idle speed, or diving and leaving the area as soon as a motorboat got anywhere near. Ms. Spellman testified, based upon her presence in the waters of the Canaveral Barge Canal or in the Port east of the Locks, that she has been in the water with manatees on five occasions when a barge/tug combination came by and in all cases the manatees reacted to the barge well in advance of the barge coming near her and the manatee, and that in each instance the manatee swam to within 15 to 20 feet of the shoreline. Of the thousands of times that she has seen manatees, she estimated that 95 percent of the time the manatees had scars from boat propellers or skegs. Dr. Powell testified, based upon over 30 years of observation of boat-manatee interactions, that the typical reaction is a flight or startle response, often to dive to deeper water. The diving response may take the manatee under the boat, away from the boat, or across the path of the boat. Based on his observations, including manatees reacting to motorboats moving at "idle-speed," "slow-speed" and at "faster-speeds," Dr. Powell opined that the manatees' reactions resulted from acoustical cues, visual cues, and perhaps pressure cues. Captain Singley, tugboat operator in Brevard County for over 30 years, observed a group of manatees react to a fast moving planing hull; some animals broke the surface, others scattered to the right or left, and others dove to the bottom. Mr. Walden, Sea Ray's Boat, Inc.'s, performance and water test specialist, testified that he had observed manatees in the Barge Canal, and sometimes the manatees would react to the motorboat. The majority of time when the boat was operating at planing speed or faster the manatee would dive and go deeper, and would began evasive action, upon hearing and noticing the motorboat a couple of hundred feet away. Dr. Gerstein testified that fast moving boats can hit manatees and that he was not aware of any physical evidence, eye- witness account, or law enforcement report of a slow-moving boat hitting a manatee. STUDIES ABOUT MOTORBOAT-MANATEE INTERACTION KNOWN BOAT STRIKES FWCC considered that watercraft collisions with manatees are rarely reported to authorities, and, as a result, it is difficult to directly assess the circumstances of such collisions, such as boat size, type and speed at the time of collision. A summary entitled "Watercraft-related Manatee Deaths Where the Responsible Vessel is Known," indicates that barges, displacement hull vessels, and planing hull vessels are known to have been in fatal collisions with manatees. In those planing- hull incidents where the vessels and estimated speed are known, the speed of the vessel ranged from getting-up-on-plane (45-foot boat with twin 425 HP outboard motors) to 35 MPH (18-foot boat with 150 outboard motor). Two other incidents were a 46-foot boat with twin inboard motors operating at 18 knots and a 20- foot boat with 200 HP outboard operating at 20 MPH. The only indication that a slow-moving planing-hull vessel struck a manatee is a report from an individual who was operating at estimated five MPH in a flat hull vessel and reported to have "felt a bump on aft hull, saw two animals (manatees) swam off." PROTECTION OF MANATEE-SEA GRASS HABITAT FWCC considered protection of sea grass habitat a secondary purpose in the Proposed Rule for areas subject to Section 370.12(2)(m), Florida Statutes. The Florida Guide To Recreational Boating notes that: Sea grass beds have been severely scarred (torn up) by boats operated in extremely shallow water. This is due, in part, to the "flats fishing craze" and the rising popularity of vessels designed to operate in shallow water. The Guide recommends that operators set the boat's drive unit at the highest possible setting and that the operator "proceed at idle speed when moving through shallow grass beds." Dr. Reynolds testified that "idle speed" or "slow speed" shoreline buffer zones provide greater sea grass protection (and manatee conservation) than higher motorboat speeds. The Executive Director of the Indian River Guides Association testified that the group is promoting "pole and troll" areas within the Merritt Island National Wildlife refuge portions of the Indian River Lagoon. He stated that many people from Orlando and elsewhere bring their boats by trailers to Brevard County, or move to Brevard County, and operate their boats so as to tear up seagrass beds. FWCC correctly concluded that "slow speed" and "idle speed" zones provide a greater measure of protection to shallow seagrass beds than do higher speeds for motorboats. DATA SOURCES CONSIDERED BY FWCC IN PROMULGATING THE PROPOSED RULE Differing Opinions About Manatee Protection Areas FWCC's Opinion The FWCC, based on the following, took the position that the proposed rules are more likely to protect manatees from motorboat impacts than the existing rules, and that the proposed rules take advantage of the available science of manatee biology and conservation, using the same basic approach used in manatee conservation by officials in Australia to protect dugongs (another Sirenian) from motorboats. The FWCC postulates that "idle speed" and "slow speed" zones provide greater protection to manatees than do higher motorboat speeds. "Maximum 25 MPH" speed zones in deeper water areas provide greater manatee protection than do unregulated waters. Most motorboats observed operating in unregulated areas (outside "slow speed" or "idle speed" zones) in Brevard County, during Dr. Morris' boating compliance study, were operating at or below 25 MPH. The FWCC correctly concludes that "maximum 25 MPH" speed was reasonable in light of research into the minimum planing speed of most recreational motorboat models, the observations of typical motorboat speed and operation in unregulated waters of Brevard County. The FWCC considered 1997 DEP-solicited information from motorboat manufacturers to determine minimum planing speeds and maximum planing speeds, and draft on- and off-plane for various sizes and types of motorboats. Considered also by the FWCC was boating test literature to determine that most boat models could reach planing speed at or slightly below 25 MPH. The FWCC considered information that was submitted showing that many production boats reached planing speed between 20-25 MPH. For example, Scout Boats' 11 models planed between 20- 25 MPH, and Shamrock's 13 models planed between 20-25 MPH. The Florida Marine Research Institute's 1992 information on this topic found a range of minimum planing speed between 14 and 24 MPH. Motorboats operating at speeds higher than 25 MPH are many. Ranger Boats offered several models with maximum speed in the "upper 60's" to "low 70's"; Scout Boats' models had top speeds of 35-60 MPH; Shamrock's models ran at the top end between 36-41 MPH; Donzi Boats operate at speeds in the 70 MPH range; and Bayliner's Capri 1700LS had a top speed of 46 MPH, as did Stingray's 180RS. Since the FWCC's creation, speed zone rules adopted for Lee County included maximum 25 MPH zones. Rule 68C-22.005, Florida Administrative Code for Brevard County has regulated motorboats with a "maximum 25 MPH" speed in channels. Commission staff applied their professional judgment in developing recommendations on manatee protection areas, and presented those recommendations to the FWCC, who considered staff recommendation, in context with public comment, to determine what manatee protections were warranted. PETITIONERS' OPINIONS The various Petitioners advocate manatee protection zones that, in many cases, are similar to the FWCC's proposed rules, including "slow speed" shoreline buffer zones and "maximum 25 MPH channels." Petitioners' challenge to many of the protection zones alleges that FWCC's basic regulatory mechanisms are flawed. FEDERAL LAWSUIT-SETTLEMENT AGREEMENT On or about January 13, 2000, STMC and other related environmental groups filed a lawsuit in the Federal District Court against Alan Egbert as Executive Director of the FWCC. The suit alleged, inter alia, that the FWCC is in violation of the Endangered Species Act by permitting the unauthorized taking of manatees in the State of Florida. During the pendency of the litigation, FWCC engaged in a series of mediations resulting in a settlement agreement approved by FWCC and executed by the parties in April 2001. The agreement contained a series of maps with draft manatee (speed) zones for Brevard County. Petitioners alleged that "the genesis of the Proposed Rule is this settlement agreement reached in the Egbert case, and there is a definite connection between the language of the Proposed Rule being challenged and the settlement agreement." Petitioners' speculative conclusion regarding this suit was tendered without one iota of evidence. Mr. Calleson, FWCC's staff employee, acknowledged that portions of existing speed zones and proposed speed zones in maps resulting from the federal mediation process contained a "lot of similarities" with speed zones in maps of the proposed rule. Mr. Calleson acknowledged that the FWCC did not direct staff to conduct negotiated rule-making on the proposed rule, and staff participation in the federal mediation process was not a negotiated rule-making process pursuant to Section 120.54(2), Florida Statutes, which provides, in pertinent part: (d)1. An agency may use negotiated rulemaking in developing and adopting rules. The agency should consider the use of negotiated rulemaking when complex rules are being drafted or strong opposition to the rules is anticipated. The agency should consider, but is not limited to considering, whether a balanced committee of interested persons who will negotiate in good faith can be assembled, whether the agency is willing to support the work of the negotiating committee, and whether the agency can use the group consensus as the basis for its proposed rule. Negotiated rulemaking uses a committee of designated representatives to draft a mutually acceptable proposed rule. * * * 3. The agency's decision to use negotiated rulemaking, its selection of the representative groups, and approval or denial of an application to participate in the negotiated rulemaking process are not agency action. Nothing in this subparagraph is intended to affect the rights of an affected person to challenge a proposed rule developed under this paragraph in accordance with s. 120.56(2). THOMAS MCGILL PETITIONERS Most of the McGill Petitioners support the adoption of rules that are consistent with the Citizens for Florida Waterway, Inc. (CFW), proposal submitted on December 29, 2000. The CFW proposal endorsed the use of "slow speed" zones, the use of "maximum 25 MPH zones," existing power plants "idle speed" and "motorboat prohibited" zones, and the use of shoreline buffers. The CFW proposal differed from the proposed rules primarily in scope of the proposed zones, rather than the nature of the proposed zones. The CFW proposal recommended numerous 25 MPH channels (in marked channels) through protected areas: from the Canaveral Locks through the Canaveral Barge Canal to the Indian River (except for three slow-speed boating safety zones); in North Sykes Creek; in the Banana River north of State Road 528 and between Bicentennial Park to the State Road 520 Relief Bridge. STANDING WATCH, INC. Stowell Robertson, one co-Petitioner of Standing Watch, Inc., is Executive Director of the Indian River Guides Association, Inc. (Guides). Mr. Robertson wrote the Guides' Recommendations, but his personal recommendation differed in two respects: in the North Indian River between NASA railroad bridge and the State Road 405 bridge, he would establish a "slow speed" zone from the western shoreline out to 500 feet (instead of 300); and he would impose a maximum 25 MPH speed in the Canaveral Barge Canal instead of 20 MPH. The Guides recommended that motorboat speed and operation be limited as follow: Mosquito Lagoon-make no changes to existing rule Turnbull Basin, North Indian River Create two "slow speed" zones in Turnbull - one in the Mimms Scottsmoor Canal, another from Jones Road boat ramp to Little Flounder Creek from the shore to 100 feet into the Basin; Set a new "slow speed" zone on the north side of the NASA railroad causeway and bridge out to 250 feet; Set a maximum 25 MPH in the ICW from Haulover Canal to the NASA railroad bridge; Take no further action [to change regulations]. Indian River, NASA railroad bridge to S.R. 402 Place "slow speed" zones on the south side of the NASA railroad bridge and causeway out to 250 feet; Reduce the [existing] west shoreline "slow speed" zone so that the western boundary is 350 feet from the ICW between markers R2 and G1; Set a maximum 25 MPH in the ICW; Take no further action [to change regulations] Indian River, State Road 406 to State Road 402 (1) and (2) Replace eastern "slow speed" zone with reduced "slow speed" zone extending from Peacock's Pocket to the existing "slow speed zone north of the State Road 405 Causeway, extending from shore to 250 feet west of the sand bar/drop off or three feet of water; Reduce the size of the "slow speed" zone north of State Road 405 Causeway to 300 feet; Reduce the size of the existing western shoreline "slow speed" zone to 500 feet from shoreline; Take no further action [to change regulations]. Indian River, State Road 405 to State Road 528 Bridge Close the warm water refuge sites at the power plants to manatees, not to boats; Deliver fuel to the power plants by land; Reduce the existing "slow speed" zone on the western shoreline to 1,000 feet from the shore; Take no further action [to change regulations]. Canaveral Barge (and Banana River to Locks) Maximum 20 MPH channel from Indian River to entrance to Canaveral Locks with "slow speed" zones at 100 feet either side of State Road 3 bridge, Sea Ray docks, Harbor Square Marina; Take no further action (to change regulations). Banana River (1) (2) All waters of Banana River, including channels, not otherwise regulated at "slow speed" should have 25 MPH limit; Reduce all existing "slow speed" zones along east and west shorelines, causeways, and bridges to 500 feet of shore; Retain existing "slow speed" zones in the two channels into "Long Point"[north and south ends of Canaveral Sewer Plant area]; Take no further actions [to change regulations]. Newfound Harbor (1) (2) All waters of Newfound Harbor, including channels, not otherwise regulated at "slow speed" should have a 25 PMH daytime limit and 20 MPH nighttime limit; Establish a "slow speed" zone along western shoreline from State Road 520 south to Two Islands; Establish a "slow speed" zone along eastern shoreline from State Road 520 south to the inside point north of Buck Point; The east and west "slow speed" zones be 500 feet from shorelines, and 200 feet[along northern shore] from S.R. 520; Take no further action. Sykes Creek North State Road 520 Set speed limit in marked channel at 20 MPH; All residential canals should be "slow speed"; Take no further action. Indian River State Road 528 to State Road 520 Establish 500 foot "slow speed" zones along western and eastern shorelines and 200 feet from causeways and bridges; Take no further action. Indian River State Road 520 to State Road 404 Establish 500 foot "slow speed" zones along western and eastern shorelines and 200 feet from causeway bridges; Take no further action. Indian River State Road 404 to State Road 518 Establish 500 foot "slow speed" zones along western and eastern shorelines and 200 feet from causeways and bridges; Take no further action. Indian River State Road 518 to State Road 192 Establish 500 foot "slow speed" zones along western and eastern shorelines and 200 feet from causeways and bridges; Establish Eau Gallie River "slow speed" zone with 20 MPH speed limit in marked channel daytime only, "slow speed" at night; Take no further action. Indian River (1) Establish 500 foot "slow speed" zones along western and eastern shorelines and 200 feet from causeways and bridges; (2)-(5) Crane Creek, Turkey Creek, St. Sebastian River, C-54 canal should be "slow speed"; Take no further action. Mr. James Kalvin, Standing Watch co-Petitioner and also President of Standing Watch, Inc., testified at deposition that neither he, nor the corporation, had any objection to the existing Brevard County manatee protection rules. SPECIFIC PROPOSED ZONES CHALLENGED The Petitioners' Challenge All Petitioners challenged the validity of Proposed Rule 68C-22.006, as "an invalid exercise of delegated legislative authority" as that phrase is defined in Section 120.52(8), Florida Statutes. MCGILL PETITIONERS The McGill Petitioners challenged the proposed rule amendment for Brevard County manatee protection areas, Proposed Rule 68C-22.006 (2)(d)2, 5, 6, 7, 8, 11, 12, 13, 14, 15, 16, 17, and 18, as an invalid exercise of delegated legislative authority. They allege that additional slow speed zones in Brevard County are invalid because the FWCC exceeded the authority granted in Section 370.12(2), Florida Statutes. McGill Petitioners based their allegations on the FWCC's lack of definable principles or data and an erroneously assumed cause-effect relationship for boat-manatee collisions, failure by the FWCC to consider the hearing limitations and capabilities of manatees in their environment, and a failure by the FWCC to employ standards and definitions for critical terms in its rule promulgation. At the final hearing, McGill Petitioners agreed that they do not object to that portion of Proposed Rule 68C- 22.006(2)(d)15 that reduces the width of the slow-speed zone in the Banana River between State Road 528 and State Road 520 causeways. Petitioners do, in fact, object to removal of the 25 MPH exemption for residential channels. The McGill Petitioners' position as set forth in their Prehearing Stipulation states: The Florida Fish and Wildlife Commission has exercised unbridled discretion and acted beyond the authority delegated in 370.12(2)(m), Florida Statutes, and has developed the proposed rule in an arbitrary and capricious manner. The proposed rule exceeds the delegated legislative authority because it is not based on scientifically definable principles or data. By failing to understand the root cause of watercraft mortality such as the manatee's inability to hear slow moving vessels, the Commission cannot deem their actions "necessary" to justify imposing speed restrictions as required by Section 370.12(2)(m), Florida Statutes. The Commission continues to impose speed motorboat restrictions even after finding that such restrictions are ineffective at preventing manatee mortality. The Commission relies on a flawed mortality database, a poor understanding of the limitations and applicability of satellite telemetry data, and lack of standards and definitions for critical terms. [emphasis added] The McGill Petitioners' Amended Petition alleged in paragraph 6: The Commission has not employed the best available science or even reasonable science. . . . aerial survey and telemetry data were misapplied. . . . in that areas that did not reflect frequent usage . . . were designated . . . slow speed zones. Also, the use of inaccurate telemetry tracking information was used as the basis for justifying areas where aerial survey data showed no manatee activity. . . . In support of their alleged inaccuracy of the satellite telemetry data, Petitioners presented the testimony of Mr. Dvorak and his Power-point Presentation of Aerial Survey Mortality, Telemetry and Bathymetry Assessment, and other technical papers. Mr. Dvorak did not include in his presentation/analysis survey data available on the Atlas or Marine Resources and did not include all telemetry data available from the United States Geological Survey, which was included in Dr. Deutsch's analysis presented for Respondent, FWCC. The Amended McGill Petition, paragraphs 10 and 12, stated: The McGill Petitioners advised the FWCC that creation of new "slow speed" zones was based upon incorrect assumption "that such slow speed zones alleviate collisions between vessels and manatee" and they suggested that "slow moving vessels are responsible for the majority of documented manatee collisions." McGill Petitioners' evidence proffered to demonstrate that "slow moving vessels are responsible for the majority of documented manatee collisions," consisted of inclusive studies and undocumented theories to demonstrate that slow speed zones do not alleviate collisions between vessels and manatees. FWCC considered an abundance of the best evidence of known or suspected collisions between vessels and manatees that demonstrated that "fast moving motorboats" are a known major source of manatee- vessel collisions. The McGill Petitioners further stated in paragraph 11 that: The rule does not consider the acoustic realities of the manatee's hearing limitations and its environment. McGill Petitioners presented the testimony of Dr. Edmund Gerstein regarding his measurements of the manatees' ability to hear noises. Dr. Gerstein concluded from his research that manatees have difficulty hearing and locating low-frequency sounds (below 400Hz), and they have difficulty detecting sounds of any frequency when it is not sufficiently louder than the ambient noise level. The testimony of Dr. Joseph Blue was given in support of the McGill Petitioners' position that low-frequency sounds are quickly attenuated in shallow water because of the Lloyd Mirror effect. Upon this foundation, Dr. Blue testified that since sound is shadowed ahead of the barge(s), the tugs that push the fuel oil barges between Prot Canaveral and the power plants on the Indian River emit low-frequency sound that is shadowed in the forward direction by the barge(s) and it would be undetectable to animals. Thus, the McGill Petitioners' witnesses concluded that there are acoustic consequences associated with slowing down boats. According to Dr. Gerstein, requiring motor boats to travel a slow speed deprives manatees of acoustic information they can use to detect, localize, and avoid boats. It is this "science of acoustics" Petitioners alleged that the FWCC gave no weight in promulgating the proposed rule. The FWCC considered the issues raised by acoustic studies. The FWCC's Executive Director was advised on the subject by the Manatee Technical Advisory Committee (MATC) whose recommendation resulted from a workshop on acoustic research and technology with presentations of the work of Drs. Gerstein and Blue. No reliable scientific sources, professional literature, expert opinions, and direct observations of manatee reactions to motorboats, supports the proposition of Drs. Gerstein and Blue that manatees cannot hear slow-moving motorboats. The FWCC rejected the studies of Drs. Gerstein and Blue. McGill Petitioners' alleged in paragraphs 3, 4, 13, and 14, of their Amended Petition that the FWCC did not provide a reasonable opportunity for and ignored much of the public's input. In their Prehearing Stipulation, the McGill Petitioners' acknowledgement of public hearings held by FWCC and the opportunity for pubic input during those hearings. There is an abundance of evidence in the record that demonstrates that the FWCC staff held non-mandatory pre-rule development meetings with interested persons, including some of the McGill Petitioners. The Staff held two rule development workshops in Brevard County. Staff held a public hearing specifically on the Proposed Rules in Brevard County. Staff considered the rule adoption at many hours of public hearings on three different dates and locations. Staff mailed special notices regarding the Proposed Rules to all identified waterfront property owners of whom many are the McGill Petitioners, and Staff mailed a series of survey documents to identified boaters and businesses in conjunction with the preparation of a statement of estimated regulatory cost. (CSERC) In paragraphs 7 and 9 of their Amended Petition, the McGill Petitioners alleged that the FWCC entered into a Negotiated Rule-Making Process with litigants to the exclusion of a balanced committee in violation of 120.54(2)(d)1., Florida Statutes. Section 120.54(2)(a), Florida Statutes, authorizes an agency to engage in development of a "preliminary text" or "preliminary draft" of proposed rules prior to the publication of a notice of rule development. Preliminary maps of amendments to the BCMPR were similar to maps being discussed as part of the federal mediation. This fact alone is not a basis to conclude violation of the above-cited statutes. A second rule development workshop was noticed to discuss a preliminary copy of the Staff's "zone configuration" being considered. Subsequent to the second workshop, the FWCC authorized publication of Notice of Proposed Rule-making that incorporated changes to the preliminary draft maps that were discussed at the workshop. The McGill Petitioners, during the hearing, agreed that they do not object to that portion of Proposed Rule 68C-22.006(2)(d)15 that reduces the width of the slow-speed zone in the Banana River between State Road 528 and State Road 520 causeways. Petitioners do, in fact, object to removal of the 25 MPH exemption for residential channels. Petitioners offered no testimony in support of this allegation, choosing rather to adopt the evidence and position proffered by Standing Watch, Inc., herein below addressed. In paragraphs 5 and 15 of their Amended Petition, the McGill Petitioners alleged that the Commission did not properly address the consideration of lower cost regulatory alternatives. The "lower cost regulatory alternatives" submitted by McGill, Pritchard and Dvorak were considered and were discussed in the draft SERC. The draft SERC gave reasons for the rejection of each of the proposed "lower cost regulator alternatives," primarily because none would substantially accomplish the objectives of the law being implemented. The SERC was finalized, as required by Sections 120.541(1)(a) and (c); and 120.56(2)(b), Florida Statutes, before filing for adoption with the Secretary of State. In paragraph 17 of their Amended Petition, the McGill Petitioners alleged that the FWCC failed to employ metrics or standards that could be used to validate the effectiveness of both proposed and existing rules, in rule promulgation, and that without the use of metrics, the FWCC had no way to determine and verify that speed zones they propose are necessary to protect harmful collisions with motorboats. The McGill Petitioners proffered no evidence of specific "metrics or standards" that would validate the effectiveness of the existing and or the proposed rule they contend the FWCC could have or should have used in the Proposed Rule development. The FWCC relied upon the best available and reliable information in its rule-making, including opinions of experts. To the information available to it, the FWCC applied its professional judgment, gave consideration to public comments/concerns provided during public meetings, and considered the estimated regulatory costs and other applicable rule-making requirements. In paragraph 18 of their Amended Petition, the McGill Petitioners alleged that the FWCC repeatedly ignored requests to sub classify watercraft-related mortalities in order to properly identify appropriate corrective action. The FWCC considered all available data regarding manatee injury and death resulting from the speed of motor boats and rejected Petitioner's contention that boat size, large boats such as tugs and barges, were more dangerous to manatees than smaller and faster motorboats. Sea Ray Boat, Inc. Petitioner, Sea Ray Boats, Inc., challenged only Proposed Rule 68C-22.006(2)(d)(11) that modifies the existing manatee protection speed zones in the Canaveral Barge Canal (that is 200 feet wide with a 125-foot navigation channel maintained at a depth of 12.5 feet) such that the entire Canal will now be designated a "slow speed" zone. Sea Ray does not argue that the FWCC did not consider all available information or that FWCC's consideration of the information was not complete. Sea Ray's position is, were one to consider the information presented to the FWCC, as balanced against the federal lawsuit filed by Save the Manatee Club, Inc., the challenged Proposed Rule is the result of the latter not the former and, therefore, is an invalid delegation of legislative authority. Sea Ray alleges that the FWCC did not analyze nor address the adequacy of the existing rule and speed zones in effect in the Canaveral Barge Canal. Sea Ray alleged that the FWCC did not consider the alternative (with weekend boating increases over weekdays) whether the risk to manatees would be reduced by "restricting slow speed zones in the channel to weekend and holidays." Sea Ray alleged that the FWCC failed to apply "properly" the mandatory balancing test of the impact of the proposed rule on the rights of commercial and recreational boaters. Section 370.12(2)(j), Florida Statutes. Sea Ray argues that the FWCC's consideration of information in formulating the Proposed Rule was devoid of "ascertainable quantitative criteria, standards or analytical processes," that Sea Ray maintains is required by Section 370.12, Florida Statutes. Standing Watch, Inc. Standing Watch, Inc.'s, Second Amended Petition challenged and alleged that the proposed speed in proposed Rule 68C-22.006(2)(e) 1-5 is not based upon "competent, substantial evidence" and does not comport with Section 370.12(2), Florida Statutes. Paragraphs 38 and 39 alleged that the proposed speeds in the Proposed Rule 68C-22.006(2)(c) 1-6 and (2)(d) 1-18 are not based upon "competent, substantial evidence" and do not comport with Section 370.12(2), Florida Statutes. Standing Watch, in essence, challenges all "idle," "slow" and "25 MPH" maximum speed zones proposed. Standing Watch argues that the FWCC failed to "quantify" by rule or working definition such terms such as "frequent" and "seasonal" and failed to define the term "periodic." Therefore, without working definitions the FWCC had no "threshold" from which to determine whether manatees were "frequently sighted," and the proposed rule is, accordingly, invalid in its entirety. Thus, it is alleged that the FWCC made no independent findings based upon the data reviewed that manatees were "frequently sighted" in any specific area of Brevard County. Standing Watch alleged, "The genesis of the Proposed Rule is this settlement agreement reached in the Egbert case, and there is a definite connection between the language of the Proposed Rule being challenged and the settlement agreement." Mr. Calleson acknowledged that portions of existing speed zones and proposed speed zones in maps resulting from the federal mediation process contained a "lot of similarities" with the speed zones in maps of the Proposed Rule. The FWCC declined to direct staff to conduct negotiated rule-making on the Proposed Rule. Accordingly, staff's participation in the federal mediation process was not a negotiated rule-making process pursuant to Section 120.54(2), Florida Statutes. Continuing their argument, Standing Watch alleged that the FWCC without algorithms, formulae, protocols, matrices, mathematical models, or metrics made no separate determination for each zone and/or area (of the proposed rule) and had no factual basis for the identification of separate speed zones, rendering all determinations made by the Commission as arbitrary and capricious. Based upon the foregone foundation, Standing Watch challenged Proposed Rule 68C-22.006 in its entirety as arbitrary and capricious. City of Cocoa Beach Watersports Area Cocoa Beach intervened to challenge that portion of Proposed Rule 68C-22.006(2)(d)16, that "reduces allowable speeds in the area known as Banana River, Cocoa Beach Waterspouts Area." In support of its challenge, Cocoa Beach adopted the Proposed Final Order submitted on behalf of Petitioners, Standing Watch, Inc., Jim, Kavin, Thomas Mason, Dougals P. Jaren and Stowell Robertson. Additionally, Cocoa Beach relied upon "facts" particularly applicable to the Cocoa Beach (Waterspouts Area). Cocoa Beach alleged that prior to the Proposed Rule and subsequent to 1988 the FWCC had no evidence of manatee deaths attributed to watercrafts having occurred in the Watersports Area; that two years prior to the proposed rule only one or two manatees were sighted in that area; that the sea grass preferred by manatees is not found in the area, and that the Watersports Area does not have the depth [bathymetry] preferred by manatees. Petitioners contend that a "sub-classification" would corroborate Mr. James Wood's view "a majority of watercraft collisions are caused by large, slow-moving vessels, not by small, recreational motorboats." Mr. Wood's analysis was inconclusive as to the characteristics of watercraft that caused manatee injury. The reliable and available evidence, including documentation on known or suspected boat strikes, scar catalog data, and affidavits of persons who perform manatee necropsies, does not support the view held by Mr. Wood. To the contrary, evidence and testimony of experts herein presented, established that small, fast moving motorboats kill and injure manatees and their habitat. The sub-classification of watercraft-related mortalities is not required for rule adoption. The proposition set forth by McGill Petitioners, and adopted by other Petitioners, that larger vessels and barge/tugs were responsible for Brevard County manatee mortalities was raised in an earlier rule challenge filed by McGill, and was rejected, as it is herein rejected. DOAH Case No. 99-5366, page 18 (officially recognized); Final Order, McGill v. Fish and Wildlife Conservation Commission, 23 F.A.L.R. (DOAH 2000). All data, 1997-1999 Brevard County relative abundance and distribution aerial survey, 2000 synoptic aerial survey, telemetry analyses, other data considered, and professional literature indicated that Brevard County is an important year- round habitat for manatees.

Florida Laws (8) 110.117120.52120.54120.56120.6822.06369.20460.403
# 7
HCA HEALTH SYSTEMS OF FLORIDA, INC., D/B/A HCA L. W. BLAKE HOSPITAL vs MANATEE HOSPITALS AND HEALTH SYSTEMS, INC., D/B/A MANATEE MEMORIAL HOSPITAL, 90-007407 (1990)
Division of Administrative Hearings, Florida Filed:Bradenton, Florida Nov. 26, 1990 Number: 90-007407 Latest Update: Jan. 04, 1991

The Issue The issue for consideration at this hearing was whether Petitioner, HCA Health Services of Florida, Inc., d/b/a HCA L. W. Blake Hospital has standing to oppose the Department's issuance of CON #6258, for a medical office building, to Manatee Hospitals and Health Systems, Inc., d/b/a Manatee Memorial Hospital.

Conclusions By Petition For Formal Hearing, filed with the Department of Health and Rehabilitative Services, (Department), on October 5, 1990, L. W. Blake Hospital (Blake), opposes the Department's approval of a Certificate of Need (CON) number 6258 to Respondent, Manatee Memorial Hospital (Manatee) to acquire a medical office building via a long-term ground lease on the basis that the proposed facility will adversely impact Blake's medical office building currently operating on its campus. Thereafter, the matter was forwarded to the Division of Administrative Hearings for appointment of a Hearing Officer. Respondents thereafter filed a Joint Motion to Dismiss Blake's Petition and a hearing was set on the motion for December 19, 1990. On that date, at the hearing, at which counsel for all parties were present, Blake filed a Motion For Leave to Amend its Petition, which was granted. The Amended Petition was filed on December 21, 1990, and the Respondents' Joint Motion to Dismiss the Amended Petition was filed on December 27, 1990. The instant hearing was held on that Joint Motion. In its Amended Petition, Blake seeks standing on it's assertion that "it appears" Manatee intends to provide new inpatient services in the new facility without Blake having the opportunity to investigate what the "new services" are and without the safeguard of a CON review. Blake claims that it is most likely that its established programs will be substantially affected by the inclusion of these "new inpatient services." In addition, Blake claims that its medical office building will be adversely impacted by Manatee's acquisition of a competing medical office building because Manatee will use its new building to attract physicians to its hospital, possibly away from Blake's campus. In ruling on a motion such as here, the Hearing Officer is bound to accept as true allegations of fact contained in the pleadings. However, here, no facts were alleged by Blake to indicate that Manatee's application calls for the providing of any new inpatient services. While Manatee's application does indicate a "direct linkage between the acute inpatient facility with the physician's [sic]" will be provided which will "enhanc[e] patient access to a range of diagnostic and treatment services" there is no indication that any new inpatient services will be provided in the new facility. Further, Blake's claim that that portion of the lease agreement, which provides Manatee the ". . . opportunity to locate certain present or anticipated hospital services and facilities in [the] new structure . . .," means new inpatient services, does not necessarily infer or imply that these "anticipated" services will be "inpatient." Here, Manatee applied for a CON for the building only - not for any new services. Any new regulated inpatient service going beyond the parameters of existing CON authorization may be implemented only upon approval after CON review at which Petitioner, or any other substantially affected provider, may have standing to contest the approval of the certificate. Initiation of such a proscribed service, without benefit of that review, would subject Manatee to the possibility of both sanctions and injunctive action. Blake's reliance on what it describes as the "ambiguity" of Manatee's application, and Manatee's use of the term, "anticipated" in its lease is not justified. Taken together, review of the pleadings herein demonstrates, at best, a substantially speculative approach by Blake which is not supported by any specifics. Alone, it is insufficient to support standing. St. Joseph Hospital of Port Charlotte, Florida, Inc., v. Department of Health and Rehabilitative Services, 559 So.2d 595 (Fla. 1st DCA 1989). Based on the foregoing Findings of Fact and Conclusions of law, it is, therefore: RECOMMENDED THAT: the Amended Petition For Formal Administrative Hearings in opposition to the Department's award of CON 6258 to Manatee Memorial Hospital, filed by HCA Health Services of Florida. Inc., d/b/a HCA L. W. Blake Hospital, be dismissed. RECOMMENDED in Tallahassee, Florida this 4th day of January, 1991. ARNOLD H. POLLOCK, Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 4th day of January, 1991. COPIES FURNISHED: Robert A. Weiss, Esquire John M. Knight, Esquire Parker, Hudson, Rainer & Dobbs The Perkins House 118 N. Gadsden Street Tallahassee, Florida 32301 Edward G. Labrador, Esquire DHRS 2727 Mahan Drive Tallahassee, Florida 32308 John Radey, Esquire Jeffrey L. Frehn, Esquire Elizabeth McArthur, Esquire Aurell, Radey. Hinkle & Thomas Suite 1000, 101 North Monroe Street Post Office Drawer 11307 Tallahassee, Florida 32302 Linda K. Harris General Counsel HRS 1323 Winewood Blvd. Tallahassee, FL 32399-0700