STEPHEN BAROS vs S.M.G., INC. AND DEPARTMENT OF ENVIRONMENTAL PROTECTION, 02-003818 (2002)
Division of Administrative Hearings, Florida Filed:Crystal River, Florida Sep. 19, 2002 Number: 02-003818 Latest Update: Jun. 03, 2003

The Issue The issue presented is whether Respondent, S.M.G., Inc. (SMG), has provided reasonable assurance that its existing air curtain incinerator will be operated in accordance with applicable statutory and rule provisions.

Findings Of Fact The Parties The Department is the state agency responsible for receiving applications for, and the issuance of, permits for the construction and operation of air curtain incinerators in the State of Florida. SMG is a contracting company, with residential, trucking, agricultural, and commercial driver's license divisions. SMG is the applicant for a permit to operate an air curtain incinerator. Petitioners reside in Citrus County, Florida, in the vicinity of the constructed and operational air curtain incinerator. For the most part, Petitioners reside northeast, east, or southeast of the site. The Petitioners demonstrated their standing in this proceeding. SMG's Construction Permit On May 23, 2001, SMG submitted an application for an air construction permit to the Department's Southwest District Office. The application sought authorization to construct an air curtain incinerator "[o]n the east or west side of 6844 N. Citrus Avenue, Crystal River," Citrus County, Florida. 1 The general purpose of pursuing this permit was to burn wood waste. On July 9, 2001, the Department issued SMG a Notice of Intent to Issue the Proposed Air Construction Permit (Permit No. 0170360-001-AC). A copy of the Notice of Intent was published in the Citrus Times in Citrus County on July 19, 2001. On August 6, 2001, the Department issued SMG an air construction permit for the proposed air curtain incinerator. The construction permit authorized the construction of a McPherson Systems, Inc. - Model M30E air curtain destructor (incinerator) with under fire air at a natural non-Title V facility. Pursuant to the terms of the construction permit, in November 2001, SMG constructed an air curtain incinerator on approximately 500 acres of land on the east side of State Route 495 north of Crystal River in Citrus County, Florida, on property owned by the Gerrits family. See Endnote 1. Pursuant to the construction permit, SMG installed a McPherson Systems, Inc. - Model M30E air curtain incinerator with under fire air, a refractory lined burning pit, three upper chamber refractory lined walls (ten feet high), and a stainless steel spark arrester screen. The manifold blower and under fire air fans are powered by an electric engine. The manufacture designs and specifications for the McPherson model were submitted with the application for the air construction permit and admitted in evidence. Construction of a portable air curtain incinerator with a blower/fan system powered by a diesel-fired engine was contemplated by the air construction permit. Although cheaper, SMG instead chose to install the McPherson model that would produce the cleanest burn, i.e., one with fewer emissions, that was operated by electricity. The McPherson model used by SMG is recognized as an efficient, reliable model of air curtain incinerator. The diesel-fired blower/fan/engine system contemplated by the construction permit is considered exempt from permitting. An engine operated by electricity has no emissions and therefore does not require an air permit from the Department. The Department could not require a permit for the blower/fan system alone. The operating permit supercedes the construction permit, except as amended. Testing after Construction of the Incinerator On November 23, 2001, SMG began operating the air curtain incinerator. Pursuant to Special Condition 22 of the air construction permit, an initial visible emissions (VE) (opacity test) compliance test was performed on November 23, 2001, by Bernard A. Ball, Jr., an environmental engineer with Southern Environmental Services, Inc. The results of the initial VE compliance test were within the opacity limits contained in the construction permit. Specific Condition 19 of the construction permit requires SMG to maintain daily operating logs of the air curtain incinerator's daily operations. In order to obtain an air operating permit, a permit applicant is required to demonstrate compliance with the Department's rules and with the conditions of the construction permit. The Department requires an applicant for an operating permit to submit copies of recent daily operating records for the facility and copies of the emissions test required by the construction permit. These operating records are submitted in order for the Department to determine whether the applicant is complying with the applicable emissions standards and that the applicant is, in fact, maintaining the required operating logs as required by the construction permit. In order for SMG to obtain the operating permit for the incinerator, Specific Condition 28 of the construction permit required SMG to file an application for an air operating permit with the Department within 45 days of testing and required the application to include a copy of the VE test report and copies of at least two recent weeks of daily operating logs. On March 14, 2002, a second VE test was conducted by Mr. Ball, which also indicated that emissions were within the construction permit's opacity limits. On April 1, 2002, SMG submitted its application for the air operation permit to the Department. The application was signed by Sean Gerrits, and contained copies of the VE test reports for the November 2001 and March 2002 tests, as well as three and one-half months of daily operating logs, certificates showing that the incinerator operators were trained, and photographs of the incinerator in operation. SMG submitted the documentation required under the construction permit. On April 19, 2002, Robert E. Soich, Jr., air compliance inspector for the Department's Southwest District Office, performed an unannounced inspection and conducted a VE test in response to a complaint by Mr. Leonard Kaplan (a Petitioner), complaining of odors present. Excessive visible emissions were observed by Mr. Soich on April 19, 2002. The incinerator did not pass the VE test because of the improper alignment of the blade angle on the manifold of the blower system and because of green leaves and inadequate drying of the materials to be burned in the incinerator. Mr. Soich also observed, in part, that "materials need to be prepared better for burning." As a result of this unannounced inspection and the negative VE test, the Department requested SMG to provide an explanation of the VE test results and of the type of changes SMG planned to implement to correct the problem. On learning of the problem, SMG shut down the incinerator and called a McPherson mechanical contractor to come out and adjust the blade angle. Southern Environmental Services conducted another VE test to ensure the problem had been corrected. On April 22, 2002, a VE test was conducted by Southern Environmental Services on-site which showed compliance with the construction permit. On April 30, 2002, SMG advised the Department that adjustments were made to the baffles to correct the angles. SMG provided the Department with the April 22, 2002, VE test results. SMG also implemented better operational procedures. On May 30, 2002, with Mr. Soich present, SMG, by Byron E. Nelson, performed another VE test. The test results showed compliance with the opacity limits in the construction permit and the results were submitted to the Department.2 Mr. Nelson, an environmental engineer with Southern Environmental Sciences, testified that he has been involved in preparing approximately two dozen applications for air curtain incinerators and has conducted probably "thousands" of visible emissions tests. Mr. Nelson is certified by the State of Florida to conduct VE tests. He has seen "two or three dozen" air curtain incinerators in operation and has conducted VE tests on about 20 of them. Based on his experience, Mr. Nelson testified that SMG employed the same practices and controls to control odor, smoke, and fugitive emissions as other such incinerators he is familiar with. He testified that the amount of smoke and odors from the SMG incinerator is similar to that emitted from other air curtain incinerators, and that the fugitive emissions from the SMG incinerator were probably less than others he is familiar with. Based on his experience, Mr. Nelson opined that SMG has taken reasonable measures to minimize odor, smoke and dust/particulates from the operation of the incinerator. Mr. Nelson likewise opined that the SMG incinerator is well run, perhaps better run than other incinerators. (Mr. Nelson had been on the SMG site twice when the incinerator was operating and burning wood products.) Based on his experience, Mr. Nelson opined that SMG meets the requirements necessary to obtain an air operating permit from the Department and has demonstrated that it has complied with the conditions of its construction permit. Mr. Soich is the air compliance inspector for the Department's Southwest District Office. He testified that he has inspected the operations of other air curtain incinerators over the last 15 years. Mr. Soich testified that SMG is one of the "better operators" of air curtain incinerators he is familiar with. (Mr. Soich visited the SMG site approximately nine times from March 13, 2002, to October 15, 2002.) Mr. McDonald is the Air Permitting Engineer for the Southwest District Office of the Department. He is responsible for reviewing all applications for air curtain incinerators in the Southwest District and has reviewed applications for between 25 and 30 incinerators. Mr. McDonald reviewed the SMG permit applications. Based on the latest VE test results, copies of the records attached to the operating permit application, and his experience, Mr. McDonald, for the Department, determined that SMG had demonstrated compliance with the conditions of the construction permit and recommended issuance of the operating permit for the incinerator. He maintained the same position at hearing. SMG provided assurance that the DeRosa Fire Department would respond in the event of a fire at the incinerator. On June 19, 2002, the Department issued the proposed air operating permit. Operation of the Air Curtain Incinerator Emissions from the incinerator are controlled by a curtain of forced air at a very high static pressure over and around the burning pit. The air curtain traps smoke and small particles and recirculates them to enhance combustion and reduce smoke. The underfire air introduces air underneath the air curtain to ensure complete combustion and minimize opacity at start-up. The refractory-tiled ceramic concrete burn pit provides a safe combustion chamber, and the refractory panels keep excess heat from escaping. The upper chamber refractory panels, which surround three sides of the burn pit, allow more retention time in the burner to better control opacity and sparks. The stainless screen spark arrestor also controls sparks and debris from leaving the burner. The operating permit application proposed the use of an air curtain blower along with a manifold to provide forced air to the burning pit. According to the manufacturer specifications, the blower can force air into the pit at velocities of between 100 and 120 mph. This ensures that the flames in the burn pit receive enough oxygen to combust completely. The air circulates inside the burn pit to ensure a complete burn, which reduces smoke and odor. The combustion temperature for the burning pit ranges from approximately 1,800 to 2,500 degrees Fahrenheit. The operating permit allows a maximum charging rate of ten tons per hour on a daily average basis and 31,200 tons per any consecutive 12 month period. The incinerator has been operating below the maximum charging rate. The operating permit limits the hours of operation (charging) to 3,120 hours per year, i.e., ten hours/day, six days/week, 52 weeks/year. According to various SMG operating and maintenance logs, the incinerator has been operated below this limit. The operating permit, in accordance with Rule 62- 296.401(7), Florida Administrative Code, allows the burning of only wood waste, yard waste, and clean lumber, and prohibits the burning/incineration of materials such as sawdust, paper, trash, tires, garbage, rubber material, plastics, liquid wastes, Bunker C residual oil, roofing materials, tar, asphalt, railroad cross ties, or other creosoted lumber, chemically treated or painted wood, and other similar materials. Biological waste shall not be burned in the incinerator. During its operation, the incinerator only burned wood and yard waste, and Mr. Gerrits testified that the waste materials are inspected before being burned in order to ensure that no prohibited materials are burned. If any non-authorized materials are observed, they are removed before the waste is burned. See Finding of Fact 24. The operating permit allows visible emissions during start-up periods (not to exceed the first 30 minutes of operation) of an opacity up to 35 percent, averaged over a six- minute period, as provided for in Rule 62-296.401(7)(a)-(b), Florida Administrative Code. The McPherson model is designed to meet the requirements of the above-referenced rule, and the VE tests run during start-up periods (except one performed by Mr. Soich on April 19, 2002) demonstrated compliance with this requirement. Id. The operating permit limits visible emissions outside of start-up periods (the first 30 minutes of daily operation) to no more that five percent opacity, with visible emissions of up to ten percent opacity allowed up to three minutes in any one hour as provided for in Rule 62-296.401(7)(a), Florida Administrative Code, and 40 Code of Federal Regulations Part 60, Subpart CCCC, adopted and incorporated by reference in Rule 62- 204.800(8)(b)74, Florida Administrative Code. (Rule 62- 296.401(7)(a) permits up to 20 percent opacity. The ten percent rate is required by the new federal standard. See SMG Exhibit 13, page 3 of 9.) The opacity limits in the operating permit are more stringent than those contained in the construction permit, which allows visible emissions of up to 20 percent opacity up to three minutes in any one-hour period. (By definition, a "visible emission" is "[a]n emission greater than 5 percent opacity or 1/4 Ringelmann measured by standard methods." Rule 62-296.200(278), Florida Administrative Code.) The VE test results submitted by SMG demonstrate compliance with the opacity limits in the operating permit and with the opacity limits in the construction permit for the days tested. See Findings of Fact 18, 22, 27, and 29. The operating permit requires that the incinerator must be attended at all times while materials are being burned and that public access to the incinerator must be restricted. A certified operator is in attendance whenever the incinerator is operated, i.e., when something is burning in the incinerator. A fence has been constructed around the property. The operating permit prohibits starting the incinerator before sunrise and requires that all charging of the incinerator be completely stopped before sunset as required by Rule 62- 296.401(7)(h), Florida Administrative Code. Mr. Gerrits testified that the incinerator is never started before sunrise and is typically started after 8:00 a.m. Mr. Gerrits testified that the incinerator is never charged after sunset and that charging typically stops at 4:00 or 5:00 p.m. See Endnote 4. These practices are consistent with the Operations and Maintenance Guide for the incinerator. The operating permit limits the height of the ash in the burning pit to one-third of the depth of the pit or to a point where the ash begins to impede combustion, whichever occurs first as provided in Rule 62-296.401(7)(m), Florida Administrative Code. The one-third depth line is marked on the outside of the incinerator. Mr. Gerrits testified that ash is regularly removed from the burning pit every third day to keep the ash level low, which helps ensure better combustion and reduces smoke. The operating permit provides that material shall not be loaded into the incinerator in such a way that it will protrude above the air curtain. Testimony established that the SMG incinerator is properly loaded. The operating permit requires that all operators of the incinerator be trained in the proper operation and maintenance of the incinerator and that an operations and maintenance guide be maintained at the facility at all times. All of the operators of the SMG incinerator have taken a four-hour training course to learn how to operate the incinerator in accordance with Department regulations and good operating practices, and certificates attesting to that training were submitted with the application for the operating permit. An Operations and Maintenance Guide was submitted with the application for the construction permit. The operating permit requires the maintenance of a daily operating log. The daily operating log must be maintained at the facility for at least five years and must be available for inspection by the Department upon request. SMG currently maintains a daily operating log that meets the requirements of the construction permit. SMG submits those daily logs to the Department on a monthly basis after the Department requested that SMG do so. The log includes a date and site location, daily operating hours, total charges, total material charged in tons, average hourly charging rate, any maintenance performed, fuel usage in gallons, and the operator's signature. The logs of record contain this information and have been initialed by SMG's operator for each day when the incinerator has been operated. SMG operators responsible for preparing the logs have no incentive to indicate the incinerator is not operating on days or during hours when it is running, as a deliberate misstatement on the operating logs could result in enforcement action by the Department and being fired by SMG. The operating permit requires that all reasonable precautions be undertaken to prevent and control the generation of unconfined emissions of particulate matter in accordance with Rule 62-296.320(4)(c), Florida Administrative Code. SMG takes reasonable precautions to prevent and control the generation of unconfined emissions of particulate matter, including paving the road that leads to the incinerator to reduce dust, wetting the ashes removed from the burn pit, wetting the ash piles and ramp that addresses the incinerator, approaching the incinerator at a slow rate, and placing a charge into the incinerator slowly and carefully. SMG voluntarily added a sprinkler system on all four corners of the burning pit that was not contemplated by the construction permit. The Department witness Mr. McDonald testified that this provided an additional method to control unconfined emissions. Although the construction permit and proposed permit do not contain conditions prohibiting the burning of green wood or wet wood waste, SMG takes precautions at the request of Mr. Soich to ensure that the wood is properly dried before being burned. See Finding of Fact 24. This helps to reduce smoke and emissions from the incinerator. (Moisture is the primary factor that inhibits burning and causes smoke and potentially odor.) As part of the routine practice in handling the wood waste before it is burned, trucks bringing wood waste to the incinerator are instructed to dump it into a pile. SMG operators then use a loader to flatten out the pile and remove dirt, prohibited materials, and harvestable pieces of wood. Harvestable pieces of wood and dirt are removed to separate staging areas. The remaining wood waste is separated into long windrows, with the oldest row closest to the incinerator. The windrows are flipped or rolled over in the direction of the incinerator, allowing the waste to dry. The waste in the row closest to the incinerator is burned, and subsequent windrows are rolled over in its place. Ash is generally removed from the burn pit every third day; it is wetted on removal to reduce dust, and the ash piles adjacent to the incinerator are also kept wetted by the sprinkler system. The ash is eventually mixed with the dirt in a composter for use as Class-A unrestricted compost. The SMG operator in charge on a particular day decides whether the incinerator will operate that day, in accordance with standard operational practices. The operator checks the weather forecast. If it is raining or if there are high winds (over 20 miles per hour), the incinerator will not be operated that day, and SMG typically waits four days after a rain to begin operating the incinerator again. These procedures are not contained in any permit conditions. The purpose of not operating during or immediately after a rain and taking steps to ensure the wood is dry is to reduce smoke; wet wood smokes more. Rainy weather can also affect odor. The purpose of not operating during windy conditions is to reduce the possibility of fire on SMG's property, but wind can also affect odor and visible emissions. On days when the incinerator is not operating, SMG conducts yard maintenance, maintains the waste windrows, and runs the composter. The composter is a source of noise and is located adjacent to the incinerator and is run when the incinerator is shut down. To ensure that the visible emission limitations are not exceeded and objectionable odors3 not generated, the operating permit requires that the incinerator's fan shall continue to operate after the last charge of the day until all combustion (presence of any flame or smoke) has ceased. Generally, the incinerator keeps burning an hour to an hour and one-half. Mr. Gerrits testified that the fan is kept running until the flames and smoke die out and that a certified operator is present until the fan is switched off. The operating permit requires that the testing of visible emissions must be conducted within 90-100 percent of the maximum allowable charging rate of 10 tons/hour and shall be conducted when the highest emissions can reasonable be expected to occur.4 Testing of the SMG incinerator was conducted at within 90-100 percent of the maximum allowable charging rate of 10 tons per hour, and the May 30, 2002, test results indicated that the incinerator was operating within the opacity limits of its permit even when operating at close to maximum capacity. Evidence established that the May 30, 2002, VE test complied with the specific conditions of both the construction and operating permit. See Finding of Fact 29. The test method for visible emissions required by both the construction permit and the operating permit is EPA Method 9, adopted and incorporated by reference at Rule 62- 204.800(8)(b)74, Florida Administrative Code. (Method 22 is not required pursuant to Department rules for compliance testing of an air curtain incinerator.) Testimony established that Method 9 was the method used for the VE tests conducted on the SMG incinerator. As required by both the construction and operating permits, the incinerator is located in excess of 300 feet from any pre-existing occupied building located off site as required by Rule 62-296.401(7)(j), Florida Administrative Code. The closest residences, that of Mr. Gerrits' father and his tenant, are approximately 1,500 feet away. Petitioners' Challenge For the most part, Petitioners reside northeast, east, or southeast of the incinerator. One Petitioner resides approximately three-tenths of a mile southeast of the incinerator; others reside at greater distances, up to approximately a mile and one-half away from the incinerator. Each of the Petitioners who testified have resided in this area for many years, pre-dating the operation of the incinerator. The Petitioners who testified were credible and well- intentioned. Each of these Petitioners maintained daily logs covering several months when the incinerator was authorized to operate. Some kept logs for several months, while others kept logs for several days. They noted their observations and perceptions in the logs. Admittedly, Petitioners are not experts in the detection of odors or noise levels. Nevertheless, they recorded their own experiences as to what they saw, heard, and/or smelled, believing that the odors and noise came from the incinerator. Some recorded that they smelled the strong odor of smoke, an "acrid smell," a "pungent smell," for example; "it makes your eyes burn and throat burn" said another during the hearing. One witness described the experience as being a prisoner in his house. Another does not go outside when the smell is bad. Generally, the level of odor varied with the weather conditions, i.e., a stronger odor was noticed on foggy and wet days or nights and when the wind blows from the west, which Petitioners contend is the prevailing wind. Some witnesses only smelled the odor during the night and not during the day, and not all of the time. Some complained about the odor and noise, or one and not the other. Some believed the noise coming from the incinerator was a major problem. At least two witnesses who live approximately three-tenths of a mile and 3,500 feet, respectively, from the incinerator site, described the noise as being like a jet airplane. One witness shuts her windows to keep out the noise. (SMG also operates a "wood chipper" or "composter" on site which is loud. Mr. Gerrits stated that he did not think the sound was the same as made by the incinerator fan. He also stated that "[i]t doesn't exceed the noise decibels. It doesn't exceed background noise levels at [their] property line.") Petitioners documented their concerns which are described, in part, above, and also documented their complaints to the Department and local government. It appears that each of the logs prepared by the Petitioners (who kept logs) were given to Petitioner Martha Futscher, who summarized and compiled a hand-written master list of the complaints. Then, Mr. Harvey inputted this data on the master list (spread sheet) of complaints, which appears as Petitioners' Exhibit F1. The master list contains recorded observations from May 2002 through January 2003. The master list contains a representation of when the incinerator started and stopped for various days and when it was operational or not, and this information was derived, according to Mr. Harvey, from the logs maintained by SMG. The master list also provides tons per hour of waste burned on particular days, the observer's initials, and the approximate distance each observer lived from the incinerator, and the comments, with time of observation or perception noted. There are discrepancies between the master list and the actual logs maintained by SMG as to when the incinerator was operational. There also appears to be several differences in observations between the Petitioners' master list and other evidence which indicates when Mr. Soich inspected the incinerator and determined that the incinerator was operating satisfactorily. Compare Petitioners' Exhibit 2 with Petitioners' Exhibit F1. For example, the master list records an observation from May 30, 2002, when the incinerator was operating, when there was noise and smoke noted at 8:00 a.m., and flames at the incinerator and odor at 5:30 p.m. Conversely, Mr. Soich was on-site on May 30, 2002, and observed the scheduled VE test. No problems were noted with the operation on this date by Mr. Soich. Mr. Soich also noted that "wood waste was properly dry and free of debris." The VE test on May 30, 2002, was performed from 10:29 a.m. to 11:59 a.m. and showed compliance with opacity limits. The master list indicates that black smoke was observed (no time given) on May 7, 2002, when the incinerator was operational, yet Mr. Soich inspected the incinerator on that day and there is a notation in the record that the incinerator was operating between 0-5 percent visible emissions. (Mr. Soich opined that it should be very rare to smell objectionable odors if the visible emissions run at a 5 percent level.) For October 15, 2002, there is a notation in the master list that a Petitioner commented that the incinerator was running during the day ("AM/PM Running") and that there was a strong smell at approximately 7:05 p.m. A strong smell at the person's house was also noted at approximately 9:30 p.m. on that day. However, Mr. Soich performed an annual inspection of the incinerator on October 15, 2002, and there is a notation on the master list, Petitioners' Exhibit 2, that the incinerator was not operating due to recent rain. As one Petitioner testified, her point was that the inspectors are not there when she hears the noise, sees smoke, and smells the odor. Mr. Soich confirmed that he does not inspect the facility in the evening. Petitioners also provided, as evidence in support of their position, six videotapes of the incinerator for September 19, October 3, October 23, November 25 (2 tapes), 2002, and January 10, 2003. (Mr. Harvey took the videotapes from the same location, across the street and west of the incinerator.) Each tape, except for September 19, 2002, showed smoke emanating from the operational incinerator. On September 19, 2002, the incinerator was not running according to the SMG log. There was a malfunction which was reported to the Department. The SMG log indicates that the pit was cleaned out, site cleared and rows moved. There is also a notation in the SMG log for this date that there was a power failure/malfunction at the incinerator at 9:00 a.m., and that the power was out. According to Mr. Gerrits, the malfunction caused smoke. (One Petitioner observed smoke from ashes on September 19, 2002.) While the Petitioners proved that there was smoke emanating from the operation of the incinerator on the days which were videotaped, with the exception of September 19, 2002, this did not necessarily prove that the emissions exceeded the requirements of the Department rules or that there was an objectionable odor emanating therefrom. Mr. Stoich observed the videotapes played during the hearing. In particular, with respect to the January 10, 2003, videotape, Petitioners' Exhibit 12, Mr. Stoich stated that a level of opacity cannot be determined from photographs and videotapes. He also noted that there was "a lot of white smoke," an atypical situation according to him, emanating from the incinerator and that he, as a compliance inspector, would have investigated further and performed an inspection, including a VE test, to determine if there was a violation, had he seen this smoke. However, he stated that without actually seeing the operation, he could not determine whether a violation had occurred. There was persuasive evidence that compliance with the opacity limits of a permit can only be determined through VE tests conducted using the Department-approved EPA Method 9. The VE test takes into account wind, the angle of the plume, the position of the sun, and other factors, and must use appropriate averaging to ensure that the test is valid. A smoke plume can look quite dense at the wrong angle or if the light is reflecting off the plume in a certain way, when in fact it is in compliance with Department rules. The VE tests for the incinerator have, with one exception, see Finding of Fact 24, demonstrated compliance with the opacity limits in the construction permit. As noted herein, upon receipt of notice that one VE test failed, SMG implemented corrective actions, and two VE tests conducted after the time showed the incinerator was operating in compliance with the opacity limits of the permit. See Findings of Fact 27 and 29. The Department relies on its compliance inspectors, such as Mr. Soich, to make a determination of whether an air emission source is causing an objectionable odor. There does not appear to be an approved Department method for measuring odors from incinerators. (Mr. Nelson stated that odors are difficult to test and that "odor is done collecting samples." No samples were taken or analyzed.) On the other hand, Mr. Soich testified that, based on his years of experience, he has developed certain methods for determining whether a facility is emitting an objectionable odor under the rules. If he receives an odor complaint, which he has in this case, he goes to the site and checks the prevailing winds. He also travels around the facility to determine the source of the odor. An odor can be deemed objectionable if it is very strong and overpowering, such that he cannot stay on- site and breathe in the odors. An odor can also be deemed objectionable if, after being on-site for some extended period of time, he begins to develop symptoms such as runny eyes, a scratchy throat, or a headache as a result of the smell. Finally, he may bring along another Department employee to determine whether the other individual finds the odor objectionable. Enforcement actions can be taken if objectionable odors are detected. Mr. Soich testified that he has inspected the incinerator at least nine times in the past year and never detected an objectionable odor. On some of the visits, the incinerator was not operational. On rebuttal, several residents of the area testified that they had not experienced objectionable odors from the incinerator. David Stevens, the Chief of the DeRosa County Fire Department, testified that an open land-clearing burn emits black smoke, more so than he observed from the incinerator. This fire department only had to respond to false alarms at the incinerator. Mr. Stevens personally inspected the operation of the incinerator and thought it was a very safe operation. Randy Morgan, a wildlife firefighter and certified burner with the Division of Forestry with over 16 years of experience in fire control, testified that approximately 50,000 acres of the state land burns occurred in Citrus County last year. These land burns can be a significant source of smoke and odor. In addition, approximately 50 open burn authorizations are issued each day. He also testified that controlled burns of approximately 15 fires of approximately 50 to 2,000 acres a day occurred in 2002 in proximity of the SMG incinerator which is a source of smoke and odor. The state also conducts open burns of some kind approximately ten months out of the year. Other witnesses testified that, given the rural nature of the community, open burning of trash, wood, and leaves occurs on a regular basis. Ultimate Findings of Fact Credible evidence established that SMG meets or exceeds the requirements in the construction permit to reduce smoke, dust, and odor, and these requirements are carried over to the operating permit. Credible evidence established that SMG employs the same, if not better, practices and permit conditions to control smoke, dust, and odor as other air curtain incinerators in the state. Credible evidence established that the SMG incinerator is operated in accordance with its construction permit. Credible evidence established that the SMG incinerator can be expected to be operated in accordance with its operating permit. Credible evidence established that the SMG incinerator is operated in accordance with Department rules. In light of the foregoing, SMG has demonstrated reasonable assurance that its air curtain incinerator has been operated in compliance with the construction permit and that the incinerator can continue to be operated in accordance with the conditions of the operating permit.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Environmental Protection enter a final order granting SMG's application and issuing Permit No. 0170360-002-AO, as amended, and subject to all conditions, including but not limited to the Specific Conditions set forth in the Department's Notice of Intent to Issue, for the operation of an air curtain incinerator in Citrus County, Florida. It is further recommended that Petitioners' challenge to the amendment to the operating permit be dismissed. See Preliminary Statement. DONE AND ENTERED this 21st day of April, 2003, in Tallahassee, Leon County, Florida.5 CHARLES A. STAMPELOS Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 21st day of April, 2003.

Florida Laws (2) 120.569120.57
# 1
BRIAN D. HARRINGTON vs S.M.G., INC. AND DEPARTMENT OF ENVIRONMENTAL PROTECTION, 02-003872 (2002)
Division of Administrative Hearings, Florida Filed:Crystal River, Florida Sep. 19, 2002 Number: 02-003872 Latest Update: Jun. 03, 2003

The Issue The issue presented is whether Respondent, S.M.G., Inc. (SMG), has provided reasonable assurance that its existing air curtain incinerator will be operated in accordance with applicable statutory and rule provisions.

Findings Of Fact The Parties The Department is the state agency responsible for receiving applications for, and the issuance of, permits for the construction and operation of air curtain incinerators in the State of Florida. SMG is a contracting company, with residential, trucking, agricultural, and commercial driver's license divisions. SMG is the applicant for a permit to operate an air curtain incinerator. Petitioners reside in Citrus County, Florida, in the vicinity of the constructed and operational air curtain incinerator. For the most part, Petitioners reside northeast, east, or southeast of the site. The Petitioners demonstrated their standing in this proceeding. SMG's Construction Permit On May 23, 2001, SMG submitted an application for an air construction permit to the Department's Southwest District Office. The application sought authorization to construct an air curtain incinerator "[o]n the east or west side of 6844 N. Citrus Avenue, Crystal River," Citrus County, Florida. 1 The general purpose of pursuing this permit was to burn wood waste. On July 9, 2001, the Department issued SMG a Notice of Intent to Issue the Proposed Air Construction Permit (Permit No. 0170360-001-AC). A copy of the Notice of Intent was published in the Citrus Times in Citrus County on July 19, 2001. On August 6, 2001, the Department issued SMG an air construction permit for the proposed air curtain incinerator. The construction permit authorized the construction of a McPherson Systems, Inc. - Model M30E air curtain destructor (incinerator) with under fire air at a natural non-Title V facility. Pursuant to the terms of the construction permit, in November 2001, SMG constructed an air curtain incinerator on approximately 500 acres of land on the east side of State Route 495 north of Crystal River in Citrus County, Florida, on property owned by the Gerrits family. See Endnote 1. Pursuant to the construction permit, SMG installed a McPherson Systems, Inc. - Model M30E air curtain incinerator with under fire air, a refractory lined burning pit, three upper chamber refractory lined walls (ten feet high), and a stainless steel spark arrester screen. The manifold blower and under fire air fans are powered by an electric engine. The manufacture designs and specifications for the McPherson model were submitted with the application for the air construction permit and admitted in evidence. Construction of a portable air curtain incinerator with a blower/fan system powered by a diesel-fired engine was contemplated by the air construction permit. Although cheaper, SMG instead chose to install the McPherson model that would produce the cleanest burn, i.e., one with fewer emissions, that was operated by electricity. The McPherson model used by SMG is recognized as an efficient, reliable model of air curtain incinerator. The diesel-fired blower/fan/engine system contemplated by the construction permit is considered exempt from permitting. An engine operated by electricity has no emissions and therefore does not require an air permit from the Department. The Department could not require a permit for the blower/fan system alone. The operating permit supercedes the construction permit, except as amended. Testing after Construction of the Incinerator On November 23, 2001, SMG began operating the air curtain incinerator. Pursuant to Special Condition 22 of the air construction permit, an initial visible emissions (VE) (opacity test) compliance test was performed on November 23, 2001, by Bernard A. Ball, Jr., an environmental engineer with Southern Environmental Services, Inc. The results of the initial VE compliance test were within the opacity limits contained in the construction permit. Specific Condition 19 of the construction permit requires SMG to maintain daily operating logs of the air curtain incinerator's daily operations. In order to obtain an air operating permit, a permit applicant is required to demonstrate compliance with the Department's rules and with the conditions of the construction permit. The Department requires an applicant for an operating permit to submit copies of recent daily operating records for the facility and copies of the emissions test required by the construction permit. These operating records are submitted in order for the Department to determine whether the applicant is complying with the applicable emissions standards and that the applicant is, in fact, maintaining the required operating logs as required by the construction permit. In order for SMG to obtain the operating permit for the incinerator, Specific Condition 28 of the construction permit required SMG to file an application for an air operating permit with the Department within 45 days of testing and required the application to include a copy of the VE test report and copies of at least two recent weeks of daily operating logs. On March 14, 2002, a second VE test was conducted by Mr. Ball, which also indicated that emissions were within the construction permit's opacity limits. On April 1, 2002, SMG submitted its application for the air operation permit to the Department. The application was signed by Sean Gerrits, and contained copies of the VE test reports for the November 2001 and March 2002 tests, as well as three and one-half months of daily operating logs, certificates showing that the incinerator operators were trained, and photographs of the incinerator in operation. SMG submitted the documentation required under the construction permit. On April 19, 2002, Robert E. Soich, Jr., air compliance inspector for the Department's Southwest District Office, performed an unannounced inspection and conducted a VE test in response to a complaint by Mr. Leonard Kaplan (a Petitioner), complaining of odors present. Excessive visible emissions were observed by Mr. Soich on April 19, 2002. The incinerator did not pass the VE test because of the improper alignment of the blade angle on the manifold of the blower system and because of green leaves and inadequate drying of the materials to be burned in the incinerator. Mr. Soich also observed, in part, that "materials need to be prepared better for burning." As a result of this unannounced inspection and the negative VE test, the Department requested SMG to provide an explanation of the VE test results and of the type of changes SMG planned to implement to correct the problem. On learning of the problem, SMG shut down the incinerator and called a McPherson mechanical contractor to come out and adjust the blade angle. Southern Environmental Services conducted another VE test to ensure the problem had been corrected. On April 22, 2002, a VE test was conducted by Southern Environmental Services on-site which showed compliance with the construction permit. On April 30, 2002, SMG advised the Department that adjustments were made to the baffles to correct the angles. SMG provided the Department with the April 22, 2002, VE test results. SMG also implemented better operational procedures. On May 30, 2002, with Mr. Soich present, SMG, by Byron E. Nelson, performed another VE test. The test results showed compliance with the opacity limits in the construction permit and the results were submitted to the Department.2 Mr. Nelson, an environmental engineer with Southern Environmental Sciences, testified that he has been involved in preparing approximately two dozen applications for air curtain incinerators and has conducted probably "thousands" of visible emissions tests. Mr. Nelson is certified by the State of Florida to conduct VE tests. He has seen "two or three dozen" air curtain incinerators in operation and has conducted VE tests on about 20 of them. Based on his experience, Mr. Nelson testified that SMG employed the same practices and controls to control odor, smoke, and fugitive emissions as other such incinerators he is familiar with. He testified that the amount of smoke and odors from the SMG incinerator is similar to that emitted from other air curtain incinerators, and that the fugitive emissions from the SMG incinerator were probably less than others he is familiar with. Based on his experience, Mr. Nelson opined that SMG has taken reasonable measures to minimize odor, smoke and dust/particulates from the operation of the incinerator. Mr. Nelson likewise opined that the SMG incinerator is well run, perhaps better run than other incinerators. (Mr. Nelson had been on the SMG site twice when the incinerator was operating and burning wood products.) Based on his experience, Mr. Nelson opined that SMG meets the requirements necessary to obtain an air operating permit from the Department and has demonstrated that it has complied with the conditions of its construction permit. Mr. Soich is the air compliance inspector for the Department's Southwest District Office. He testified that he has inspected the operations of other air curtain incinerators over the last 15 years. Mr. Soich testified that SMG is one of the "better operators" of air curtain incinerators he is familiar with. (Mr. Soich visited the SMG site approximately nine times from March 13, 2002, to October 15, 2002.) Mr. McDonald is the Air Permitting Engineer for the Southwest District Office of the Department. He is responsible for reviewing all applications for air curtain incinerators in the Southwest District and has reviewed applications for between 25 and 30 incinerators. Mr. McDonald reviewed the SMG permit applications. Based on the latest VE test results, copies of the records attached to the operating permit application, and his experience, Mr. McDonald, for the Department, determined that SMG had demonstrated compliance with the conditions of the construction permit and recommended issuance of the operating permit for the incinerator. He maintained the same position at hearing. SMG provided assurance that the DeRosa Fire Department would respond in the event of a fire at the incinerator. On June 19, 2002, the Department issued the proposed air operating permit. Operation of the Air Curtain Incinerator Emissions from the incinerator are controlled by a curtain of forced air at a very high static pressure over and around the burning pit. The air curtain traps smoke and small particles and recirculates them to enhance combustion and reduce smoke. The underfire air introduces air underneath the air curtain to ensure complete combustion and minimize opacity at start-up. The refractory-tiled ceramic concrete burn pit provides a safe combustion chamber, and the refractory panels keep excess heat from escaping. The upper chamber refractory panels, which surround three sides of the burn pit, allow more retention time in the burner to better control opacity and sparks. The stainless screen spark arrestor also controls sparks and debris from leaving the burner. The operating permit application proposed the use of an air curtain blower along with a manifold to provide forced air to the burning pit. According to the manufacturer specifications, the blower can force air into the pit at velocities of between 100 and 120 mph. This ensures that the flames in the burn pit receive enough oxygen to combust completely. The air circulates inside the burn pit to ensure a complete burn, which reduces smoke and odor. The combustion temperature for the burning pit ranges from approximately 1,800 to 2,500 degrees Fahrenheit. The operating permit allows a maximum charging rate of ten tons per hour on a daily average basis and 31,200 tons per any consecutive 12 month period. The incinerator has been operating below the maximum charging rate. The operating permit limits the hours of operation (charging) to 3,120 hours per year, i.e., ten hours/day, six days/week, 52 weeks/year. According to various SMG operating and maintenance logs, the incinerator has been operated below this limit. The operating permit, in accordance with Rule 62- 296.401(7), Florida Administrative Code, allows the burning of only wood waste, yard waste, and clean lumber, and prohibits the burning/incineration of materials such as sawdust, paper, trash, tires, garbage, rubber material, plastics, liquid wastes, Bunker C residual oil, roofing materials, tar, asphalt, railroad cross ties, or other creosoted lumber, chemically treated or painted wood, and other similar materials. Biological waste shall not be burned in the incinerator. During its operation, the incinerator only burned wood and yard waste, and Mr. Gerrits testified that the waste materials are inspected before being burned in order to ensure that no prohibited materials are burned. If any non-authorized materials are observed, they are removed before the waste is burned. See Finding of Fact 24. The operating permit allows visible emissions during start-up periods (not to exceed the first 30 minutes of operation) of an opacity up to 35 percent, averaged over a six- minute period, as provided for in Rule 62-296.401(7)(a)-(b), Florida Administrative Code. The McPherson model is designed to meet the requirements of the above-referenced rule, and the VE tests run during start-up periods (except one performed by Mr. Soich on April 19, 2002) demonstrated compliance with this requirement. Id. The operating permit limits visible emissions outside of start-up periods (the first 30 minutes of daily operation) to no more that five percent opacity, with visible emissions of up to ten percent opacity allowed up to three minutes in any one hour as provided for in Rule 62-296.401(7)(a), Florida Administrative Code, and 40 Code of Federal Regulations Part 60, Subpart CCCC, adopted and incorporated by reference in Rule 62- 204.800(8)(b)74, Florida Administrative Code. (Rule 62- 296.401(7)(a) permits up to 20 percent opacity. The ten percent rate is required by the new federal standard. See SMG Exhibit 13, page 3 of 9.) The opacity limits in the operating permit are more stringent than those contained in the construction permit, which allows visible emissions of up to 20 percent opacity up to three minutes in any one-hour period. (By definition, a "visible emission" is "[a]n emission greater than 5 percent opacity or 1/4 Ringelmann measured by standard methods." Rule 62-296.200(278), Florida Administrative Code.) The VE test results submitted by SMG demonstrate compliance with the opacity limits in the operating permit and with the opacity limits in the construction permit for the days tested. See Findings of Fact 18, 22, 27, and 29. The operating permit requires that the incinerator must be attended at all times while materials are being burned and that public access to the incinerator must be restricted. A certified operator is in attendance whenever the incinerator is operated, i.e., when something is burning in the incinerator. A fence has been constructed around the property. The operating permit prohibits starting the incinerator before sunrise and requires that all charging of the incinerator be completely stopped before sunset as required by Rule 62- 296.401(7)(h), Florida Administrative Code. Mr. Gerrits testified that the incinerator is never started before sunrise and is typically started after 8:00 a.m. Mr. Gerrits testified that the incinerator is never charged after sunset and that charging typically stops at 4:00 or 5:00 p.m. See Endnote 4. These practices are consistent with the Operations and Maintenance Guide for the incinerator. The operating permit limits the height of the ash in the burning pit to one-third of the depth of the pit or to a point where the ash begins to impede combustion, whichever occurs first as provided in Rule 62-296.401(7)(m), Florida Administrative Code. The one-third depth line is marked on the outside of the incinerator. Mr. Gerrits testified that ash is regularly removed from the burning pit every third day to keep the ash level low, which helps ensure better combustion and reduces smoke. The operating permit provides that material shall not be loaded into the incinerator in such a way that it will protrude above the air curtain. Testimony established that the SMG incinerator is properly loaded. The operating permit requires that all operators of the incinerator be trained in the proper operation and maintenance of the incinerator and that an operations and maintenance guide be maintained at the facility at all times. All of the operators of the SMG incinerator have taken a four-hour training course to learn how to operate the incinerator in accordance with Department regulations and good operating practices, and certificates attesting to that training were submitted with the application for the operating permit. An Operations and Maintenance Guide was submitted with the application for the construction permit. The operating permit requires the maintenance of a daily operating log. The daily operating log must be maintained at the facility for at least five years and must be available for inspection by the Department upon request. SMG currently maintains a daily operating log that meets the requirements of the construction permit. SMG submits those daily logs to the Department on a monthly basis after the Department requested that SMG do so. The log includes a date and site location, daily operating hours, total charges, total material charged in tons, average hourly charging rate, any maintenance performed, fuel usage in gallons, and the operator's signature. The logs of record contain this information and have been initialed by SMG's operator for each day when the incinerator has been operated. SMG operators responsible for preparing the logs have no incentive to indicate the incinerator is not operating on days or during hours when it is running, as a deliberate misstatement on the operating logs could result in enforcement action by the Department and being fired by SMG. The operating permit requires that all reasonable precautions be undertaken to prevent and control the generation of unconfined emissions of particulate matter in accordance with Rule 62-296.320(4)(c), Florida Administrative Code. SMG takes reasonable precautions to prevent and control the generation of unconfined emissions of particulate matter, including paving the road that leads to the incinerator to reduce dust, wetting the ashes removed from the burn pit, wetting the ash piles and ramp that addresses the incinerator, approaching the incinerator at a slow rate, and placing a charge into the incinerator slowly and carefully. SMG voluntarily added a sprinkler system on all four corners of the burning pit that was not contemplated by the construction permit. The Department witness Mr. McDonald testified that this provided an additional method to control unconfined emissions. Although the construction permit and proposed permit do not contain conditions prohibiting the burning of green wood or wet wood waste, SMG takes precautions at the request of Mr. Soich to ensure that the wood is properly dried before being burned. See Finding of Fact 24. This helps to reduce smoke and emissions from the incinerator. (Moisture is the primary factor that inhibits burning and causes smoke and potentially odor.) As part of the routine practice in handling the wood waste before it is burned, trucks bringing wood waste to the incinerator are instructed to dump it into a pile. SMG operators then use a loader to flatten out the pile and remove dirt, prohibited materials, and harvestable pieces of wood. Harvestable pieces of wood and dirt are removed to separate staging areas. The remaining wood waste is separated into long windrows, with the oldest row closest to the incinerator. The windrows are flipped or rolled over in the direction of the incinerator, allowing the waste to dry. The waste in the row closest to the incinerator is burned, and subsequent windrows are rolled over in its place. Ash is generally removed from the burn pit every third day; it is wetted on removal to reduce dust, and the ash piles adjacent to the incinerator are also kept wetted by the sprinkler system. The ash is eventually mixed with the dirt in a composter for use as Class-A unrestricted compost. The SMG operator in charge on a particular day decides whether the incinerator will operate that day, in accordance with standard operational practices. The operator checks the weather forecast. If it is raining or if there are high winds (over 20 miles per hour), the incinerator will not be operated that day, and SMG typically waits four days after a rain to begin operating the incinerator again. These procedures are not contained in any permit conditions. The purpose of not operating during or immediately after a rain and taking steps to ensure the wood is dry is to reduce smoke; wet wood smokes more. Rainy weather can also affect odor. The purpose of not operating during windy conditions is to reduce the possibility of fire on SMG's property, but wind can also affect odor and visible emissions. On days when the incinerator is not operating, SMG conducts yard maintenance, maintains the waste windrows, and runs the composter. The composter is a source of noise and is located adjacent to the incinerator and is run when the incinerator is shut down. To ensure that the visible emission limitations are not exceeded and objectionable odors3 not generated, the operating permit requires that the incinerator's fan shall continue to operate after the last charge of the day until all combustion (presence of any flame or smoke) has ceased. Generally, the incinerator keeps burning an hour to an hour and one-half. Mr. Gerrits testified that the fan is kept running until the flames and smoke die out and that a certified operator is present until the fan is switched off. The operating permit requires that the testing of visible emissions must be conducted within 90-100 percent of the maximum allowable charging rate of 10 tons/hour and shall be conducted when the highest emissions can reasonable be expected to occur.4 Testing of the SMG incinerator was conducted at within 90-100 percent of the maximum allowable charging rate of 10 tons per hour, and the May 30, 2002, test results indicated that the incinerator was operating within the opacity limits of its permit even when operating at close to maximum capacity. Evidence established that the May 30, 2002, VE test complied with the specific conditions of both the construction and operating permit. See Finding of Fact 29. The test method for visible emissions required by both the construction permit and the operating permit is EPA Method 9, adopted and incorporated by reference at Rule 62- 204.800(8)(b)74, Florida Administrative Code. (Method 22 is not required pursuant to Department rules for compliance testing of an air curtain incinerator.) Testimony established that Method 9 was the method used for the VE tests conducted on the SMG incinerator. As required by both the construction and operating permits, the incinerator is located in excess of 300 feet from any pre-existing occupied building located off site as required by Rule 62-296.401(7)(j), Florida Administrative Code. The closest residences, that of Mr. Gerrits' father and his tenant, are approximately 1,500 feet away. Petitioners' Challenge For the most part, Petitioners reside northeast, east, or southeast of the incinerator. One Petitioner resides approximately three-tenths of a mile southeast of the incinerator; others reside at greater distances, up to approximately a mile and one-half away from the incinerator. Each of the Petitioners who testified have resided in this area for many years, pre-dating the operation of the incinerator. The Petitioners who testified were credible and well- intentioned. Each of these Petitioners maintained daily logs covering several months when the incinerator was authorized to operate. Some kept logs for several months, while others kept logs for several days. They noted their observations and perceptions in the logs. Admittedly, Petitioners are not experts in the detection of odors or noise levels. Nevertheless, they recorded their own experiences as to what they saw, heard, and/or smelled, believing that the odors and noise came from the incinerator. Some recorded that they smelled the strong odor of smoke, an "acrid smell," a "pungent smell," for example; "it makes your eyes burn and throat burn" said another during the hearing. One witness described the experience as being a prisoner in his house. Another does not go outside when the smell is bad. Generally, the level of odor varied with the weather conditions, i.e., a stronger odor was noticed on foggy and wet days or nights and when the wind blows from the west, which Petitioners contend is the prevailing wind. Some witnesses only smelled the odor during the night and not during the day, and not all of the time. Some complained about the odor and noise, or one and not the other. Some believed the noise coming from the incinerator was a major problem. At least two witnesses who live approximately three-tenths of a mile and 3,500 feet, respectively, from the incinerator site, described the noise as being like a jet airplane. One witness shuts her windows to keep out the noise. (SMG also operates a "wood chipper" or "composter" on site which is loud. Mr. Gerrits stated that he did not think the sound was the same as made by the incinerator fan. He also stated that "[i]t doesn't exceed the noise decibels. It doesn't exceed background noise levels at [their] property line.") Petitioners documented their concerns which are described, in part, above, and also documented their complaints to the Department and local government. It appears that each of the logs prepared by the Petitioners (who kept logs) were given to Petitioner Martha Futscher, who summarized and compiled a hand-written master list of the complaints. Then, Mr. Harvey inputted this data on the master list (spread sheet) of complaints, which appears as Petitioners' Exhibit F1. The master list contains recorded observations from May 2002 through January 2003. The master list contains a representation of when the incinerator started and stopped for various days and when it was operational or not, and this information was derived, according to Mr. Harvey, from the logs maintained by SMG. The master list also provides tons per hour of waste burned on particular days, the observer's initials, and the approximate distance each observer lived from the incinerator, and the comments, with time of observation or perception noted. There are discrepancies between the master list and the actual logs maintained by SMG as to when the incinerator was operational. There also appears to be several differences in observations between the Petitioners' master list and other evidence which indicates when Mr. Soich inspected the incinerator and determined that the incinerator was operating satisfactorily. Compare Petitioners' Exhibit 2 with Petitioners' Exhibit F1. For example, the master list records an observation from May 30, 2002, when the incinerator was operating, when there was noise and smoke noted at 8:00 a.m., and flames at the incinerator and odor at 5:30 p.m. Conversely, Mr. Soich was on-site on May 30, 2002, and observed the scheduled VE test. No problems were noted with the operation on this date by Mr. Soich. Mr. Soich also noted that "wood waste was properly dry and free of debris." The VE test on May 30, 2002, was performed from 10:29 a.m. to 11:59 a.m. and showed compliance with opacity limits. The master list indicates that black smoke was observed (no time given) on May 7, 2002, when the incinerator was operational, yet Mr. Soich inspected the incinerator on that day and there is a notation in the record that the incinerator was operating between 0-5 percent visible emissions. (Mr. Soich opined that it should be very rare to smell objectionable odors if the visible emissions run at a 5 percent level.) For October 15, 2002, there is a notation in the master list that a Petitioner commented that the incinerator was running during the day ("AM/PM Running") and that there was a strong smell at approximately 7:05 p.m. A strong smell at the person's house was also noted at approximately 9:30 p.m. on that day. However, Mr. Soich performed an annual inspection of the incinerator on October 15, 2002, and there is a notation on the master list, Petitioners' Exhibit 2, that the incinerator was not operating due to recent rain. As one Petitioner testified, her point was that the inspectors are not there when she hears the noise, sees smoke, and smells the odor. Mr. Soich confirmed that he does not inspect the facility in the evening. Petitioners also provided, as evidence in support of their position, six videotapes of the incinerator for September 19, October 3, October 23, November 25 (2 tapes), 2002, and January 10, 2003. (Mr. Harvey took the videotapes from the same location, across the street and west of the incinerator.) Each tape, except for September 19, 2002, showed smoke emanating from the operational incinerator. On September 19, 2002, the incinerator was not running according to the SMG log. There was a malfunction which was reported to the Department. The SMG log indicates that the pit was cleaned out, site cleared and rows moved. There is also a notation in the SMG log for this date that there was a power failure/malfunction at the incinerator at 9:00 a.m., and that the power was out. According to Mr. Gerrits, the malfunction caused smoke. (One Petitioner observed smoke from ashes on September 19, 2002.) While the Petitioners proved that there was smoke emanating from the operation of the incinerator on the days which were videotaped, with the exception of September 19, 2002, this did not necessarily prove that the emissions exceeded the requirements of the Department rules or that there was an objectionable odor emanating therefrom. Mr. Stoich observed the videotapes played during the hearing. In particular, with respect to the January 10, 2003, videotape, Petitioners' Exhibit 12, Mr. Stoich stated that a level of opacity cannot be determined from photographs and videotapes. He also noted that there was "a lot of white smoke," an atypical situation according to him, emanating from the incinerator and that he, as a compliance inspector, would have investigated further and performed an inspection, including a VE test, to determine if there was a violation, had he seen this smoke. However, he stated that without actually seeing the operation, he could not determine whether a violation had occurred. There was persuasive evidence that compliance with the opacity limits of a permit can only be determined through VE tests conducted using the Department-approved EPA Method 9. The VE test takes into account wind, the angle of the plume, the position of the sun, and other factors, and must use appropriate averaging to ensure that the test is valid. A smoke plume can look quite dense at the wrong angle or if the light is reflecting off the plume in a certain way, when in fact it is in compliance with Department rules. The VE tests for the incinerator have, with one exception, see Finding of Fact 24, demonstrated compliance with the opacity limits in the construction permit. As noted herein, upon receipt of notice that one VE test failed, SMG implemented corrective actions, and two VE tests conducted after the time showed the incinerator was operating in compliance with the opacity limits of the permit. See Findings of Fact 27 and 29. The Department relies on its compliance inspectors, such as Mr. Soich, to make a determination of whether an air emission source is causing an objectionable odor. There does not appear to be an approved Department method for measuring odors from incinerators. (Mr. Nelson stated that odors are difficult to test and that "odor is done collecting samples." No samples were taken or analyzed.) On the other hand, Mr. Soich testified that, based on his years of experience, he has developed certain methods for determining whether a facility is emitting an objectionable odor under the rules. If he receives an odor complaint, which he has in this case, he goes to the site and checks the prevailing winds. He also travels around the facility to determine the source of the odor. An odor can be deemed objectionable if it is very strong and overpowering, such that he cannot stay on- site and breathe in the odors. An odor can also be deemed objectionable if, after being on-site for some extended period of time, he begins to develop symptoms such as runny eyes, a scratchy throat, or a headache as a result of the smell. Finally, he may bring along another Department employee to determine whether the other individual finds the odor objectionable. Enforcement actions can be taken if objectionable odors are detected. Mr. Soich testified that he has inspected the incinerator at least nine times in the past year and never detected an objectionable odor. On some of the visits, the incinerator was not operational. On rebuttal, several residents of the area testified that they had not experienced objectionable odors from the incinerator. David Stevens, the Chief of the DeRosa County Fire Department, testified that an open land-clearing burn emits black smoke, more so than he observed from the incinerator. This fire department only had to respond to false alarms at the incinerator. Mr. Stevens personally inspected the operation of the incinerator and thought it was a very safe operation. Randy Morgan, a wildlife firefighter and certified burner with the Division of Forestry with over 16 years of experience in fire control, testified that approximately 50,000 acres of the state land burns occurred in Citrus County last year. These land burns can be a significant source of smoke and odor. In addition, approximately 50 open burn authorizations are issued each day. He also testified that controlled burns of approximately 15 fires of approximately 50 to 2,000 acres a day occurred in 2002 in proximity of the SMG incinerator which is a source of smoke and odor. The state also conducts open burns of some kind approximately ten months out of the year. Other witnesses testified that, given the rural nature of the community, open burning of trash, wood, and leaves occurs on a regular basis. Ultimate Findings of Fact Credible evidence established that SMG meets or exceeds the requirements in the construction permit to reduce smoke, dust, and odor, and these requirements are carried over to the operating permit. Credible evidence established that SMG employs the same, if not better, practices and permit conditions to control smoke, dust, and odor as other air curtain incinerators in the state. Credible evidence established that the SMG incinerator is operated in accordance with its construction permit. Credible evidence established that the SMG incinerator can be expected to be operated in accordance with its operating permit. Credible evidence established that the SMG incinerator is operated in accordance with Department rules. In light of the foregoing, SMG has demonstrated reasonable assurance that its air curtain incinerator has been operated in compliance with the construction permit and that the incinerator can continue to be operated in accordance with the conditions of the operating permit.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Environmental Protection enter a final order granting SMG's application and issuing Permit No. 0170360-002-AO, as amended, and subject to all conditions, including but not limited to the Specific Conditions set forth in the Department's Notice of Intent to Issue, for the operation of an air curtain incinerator in Citrus County, Florida. It is further recommended that Petitioners' challenge to the amendment to the operating permit be dismissed. See Preliminary Statement. DONE AND ENTERED this 21st day of April, 2003, in Tallahassee, Leon County, Florida.5 CHARLES A. STAMPELOS Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 21st day of April, 2003.

Florida Laws (2) 120.569120.57
# 2
TONY WASHINGTON AND JULIA WASHINGTON vs S.M.G., INC. AND DEPARTMENT OF ENVIRONMENTAL PROTECTION, 02-003880 (2002)
Division of Administrative Hearings, Florida Filed:Crystal River, Florida Sep. 19, 2002 Number: 02-003880 Latest Update: Jun. 03, 2003

The Issue The issue presented is whether Respondent, S.M.G., Inc. (SMG), has provided reasonable assurance that its existing air curtain incinerator will be operated in accordance with applicable statutory and rule provisions.

Findings Of Fact The Parties The Department is the state agency responsible for receiving applications for, and the issuance of, permits for the construction and operation of air curtain incinerators in the State of Florida. SMG is a contracting company, with residential, trucking, agricultural, and commercial driver's license divisions. SMG is the applicant for a permit to operate an air curtain incinerator. Petitioners reside in Citrus County, Florida, in the vicinity of the constructed and operational air curtain incinerator. For the most part, Petitioners reside northeast, east, or southeast of the site. The Petitioners demonstrated their standing in this proceeding. SMG's Construction Permit On May 23, 2001, SMG submitted an application for an air construction permit to the Department's Southwest District Office. The application sought authorization to construct an air curtain incinerator "[o]n the east or west side of 6844 N. Citrus Avenue, Crystal River," Citrus County, Florida. 1 The general purpose of pursuing this permit was to burn wood waste. On July 9, 2001, the Department issued SMG a Notice of Intent to Issue the Proposed Air Construction Permit (Permit No. 0170360-001-AC). A copy of the Notice of Intent was published in the Citrus Times in Citrus County on July 19, 2001. On August 6, 2001, the Department issued SMG an air construction permit for the proposed air curtain incinerator. The construction permit authorized the construction of a McPherson Systems, Inc. - Model M30E air curtain destructor (incinerator) with under fire air at a natural non-Title V facility. Pursuant to the terms of the construction permit, in November 2001, SMG constructed an air curtain incinerator on approximately 500 acres of land on the east side of State Route 495 north of Crystal River in Citrus County, Florida, on property owned by the Gerrits family. See Endnote 1. Pursuant to the construction permit, SMG installed a McPherson Systems, Inc. - Model M30E air curtain incinerator with under fire air, a refractory lined burning pit, three upper chamber refractory lined walls (ten feet high), and a stainless steel spark arrester screen. The manifold blower and under fire air fans are powered by an electric engine. The manufacture designs and specifications for the McPherson model were submitted with the application for the air construction permit and admitted in evidence. Construction of a portable air curtain incinerator with a blower/fan system powered by a diesel-fired engine was contemplated by the air construction permit. Although cheaper, SMG instead chose to install the McPherson model that would produce the cleanest burn, i.e., one with fewer emissions, that was operated by electricity. The McPherson model used by SMG is recognized as an efficient, reliable model of air curtain incinerator. The diesel-fired blower/fan/engine system contemplated by the construction permit is considered exempt from permitting. An engine operated by electricity has no emissions and therefore does not require an air permit from the Department. The Department could not require a permit for the blower/fan system alone. The operating permit supercedes the construction permit, except as amended. Testing after Construction of the Incinerator On November 23, 2001, SMG began operating the air curtain incinerator. Pursuant to Special Condition 22 of the air construction permit, an initial visible emissions (VE) (opacity test) compliance test was performed on November 23, 2001, by Bernard A. Ball, Jr., an environmental engineer with Southern Environmental Services, Inc. The results of the initial VE compliance test were within the opacity limits contained in the construction permit. Specific Condition 19 of the construction permit requires SMG to maintain daily operating logs of the air curtain incinerator's daily operations. In order to obtain an air operating permit, a permit applicant is required to demonstrate compliance with the Department's rules and with the conditions of the construction permit. The Department requires an applicant for an operating permit to submit copies of recent daily operating records for the facility and copies of the emissions test required by the construction permit. These operating records are submitted in order for the Department to determine whether the applicant is complying with the applicable emissions standards and that the applicant is, in fact, maintaining the required operating logs as required by the construction permit. In order for SMG to obtain the operating permit for the incinerator, Specific Condition 28 of the construction permit required SMG to file an application for an air operating permit with the Department within 45 days of testing and required the application to include a copy of the VE test report and copies of at least two recent weeks of daily operating logs. On March 14, 2002, a second VE test was conducted by Mr. Ball, which also indicated that emissions were within the construction permit's opacity limits. On April 1, 2002, SMG submitted its application for the air operation permit to the Department. The application was signed by Sean Gerrits, and contained copies of the VE test reports for the November 2001 and March 2002 tests, as well as three and one-half months of daily operating logs, certificates showing that the incinerator operators were trained, and photographs of the incinerator in operation. SMG submitted the documentation required under the construction permit. On April 19, 2002, Robert E. Soich, Jr., air compliance inspector for the Department's Southwest District Office, performed an unannounced inspection and conducted a VE test in response to a complaint by Mr. Leonard Kaplan (a Petitioner), complaining of odors present. Excessive visible emissions were observed by Mr. Soich on April 19, 2002. The incinerator did not pass the VE test because of the improper alignment of the blade angle on the manifold of the blower system and because of green leaves and inadequate drying of the materials to be burned in the incinerator. Mr. Soich also observed, in part, that "materials need to be prepared better for burning." As a result of this unannounced inspection and the negative VE test, the Department requested SMG to provide an explanation of the VE test results and of the type of changes SMG planned to implement to correct the problem. On learning of the problem, SMG shut down the incinerator and called a McPherson mechanical contractor to come out and adjust the blade angle. Southern Environmental Services conducted another VE test to ensure the problem had been corrected. On April 22, 2002, a VE test was conducted by Southern Environmental Services on-site which showed compliance with the construction permit. On April 30, 2002, SMG advised the Department that adjustments were made to the baffles to correct the angles. SMG provided the Department with the April 22, 2002, VE test results. SMG also implemented better operational procedures. On May 30, 2002, with Mr. Soich present, SMG, by Byron E. Nelson, performed another VE test. The test results showed compliance with the opacity limits in the construction permit and the results were submitted to the Department.2 Mr. Nelson, an environmental engineer with Southern Environmental Sciences, testified that he has been involved in preparing approximately two dozen applications for air curtain incinerators and has conducted probably "thousands" of visible emissions tests. Mr. Nelson is certified by the State of Florida to conduct VE tests. He has seen "two or three dozen" air curtain incinerators in operation and has conducted VE tests on about 20 of them. Based on his experience, Mr. Nelson testified that SMG employed the same practices and controls to control odor, smoke, and fugitive emissions as other such incinerators he is familiar with. He testified that the amount of smoke and odors from the SMG incinerator is similar to that emitted from other air curtain incinerators, and that the fugitive emissions from the SMG incinerator were probably less than others he is familiar with. Based on his experience, Mr. Nelson opined that SMG has taken reasonable measures to minimize odor, smoke and dust/particulates from the operation of the incinerator. Mr. Nelson likewise opined that the SMG incinerator is well run, perhaps better run than other incinerators. (Mr. Nelson had been on the SMG site twice when the incinerator was operating and burning wood products.) Based on his experience, Mr. Nelson opined that SMG meets the requirements necessary to obtain an air operating permit from the Department and has demonstrated that it has complied with the conditions of its construction permit. Mr. Soich is the air compliance inspector for the Department's Southwest District Office. He testified that he has inspected the operations of other air curtain incinerators over the last 15 years. Mr. Soich testified that SMG is one of the "better operators" of air curtain incinerators he is familiar with. (Mr. Soich visited the SMG site approximately nine times from March 13, 2002, to October 15, 2002.) Mr. McDonald is the Air Permitting Engineer for the Southwest District Office of the Department. He is responsible for reviewing all applications for air curtain incinerators in the Southwest District and has reviewed applications for between 25 and 30 incinerators. Mr. McDonald reviewed the SMG permit applications. Based on the latest VE test results, copies of the records attached to the operating permit application, and his experience, Mr. McDonald, for the Department, determined that SMG had demonstrated compliance with the conditions of the construction permit and recommended issuance of the operating permit for the incinerator. He maintained the same position at hearing. SMG provided assurance that the DeRosa Fire Department would respond in the event of a fire at the incinerator. On June 19, 2002, the Department issued the proposed air operating permit. Operation of the Air Curtain Incinerator Emissions from the incinerator are controlled by a curtain of forced air at a very high static pressure over and around the burning pit. The air curtain traps smoke and small particles and recirculates them to enhance combustion and reduce smoke. The underfire air introduces air underneath the air curtain to ensure complete combustion and minimize opacity at start-up. The refractory-tiled ceramic concrete burn pit provides a safe combustion chamber, and the refractory panels keep excess heat from escaping. The upper chamber refractory panels, which surround three sides of the burn pit, allow more retention time in the burner to better control opacity and sparks. The stainless screen spark arrestor also controls sparks and debris from leaving the burner. The operating permit application proposed the use of an air curtain blower along with a manifold to provide forced air to the burning pit. According to the manufacturer specifications, the blower can force air into the pit at velocities of between 100 and 120 mph. This ensures that the flames in the burn pit receive enough oxygen to combust completely. The air circulates inside the burn pit to ensure a complete burn, which reduces smoke and odor. The combustion temperature for the burning pit ranges from approximately 1,800 to 2,500 degrees Fahrenheit. The operating permit allows a maximum charging rate of ten tons per hour on a daily average basis and 31,200 tons per any consecutive 12 month period. The incinerator has been operating below the maximum charging rate. The operating permit limits the hours of operation (charging) to 3,120 hours per year, i.e., ten hours/day, six days/week, 52 weeks/year. According to various SMG operating and maintenance logs, the incinerator has been operated below this limit. The operating permit, in accordance with Rule 62- 296.401(7), Florida Administrative Code, allows the burning of only wood waste, yard waste, and clean lumber, and prohibits the burning/incineration of materials such as sawdust, paper, trash, tires, garbage, rubber material, plastics, liquid wastes, Bunker C residual oil, roofing materials, tar, asphalt, railroad cross ties, or other creosoted lumber, chemically treated or painted wood, and other similar materials. Biological waste shall not be burned in the incinerator. During its operation, the incinerator only burned wood and yard waste, and Mr. Gerrits testified that the waste materials are inspected before being burned in order to ensure that no prohibited materials are burned. If any non-authorized materials are observed, they are removed before the waste is burned. See Finding of Fact 24. The operating permit allows visible emissions during start-up periods (not to exceed the first 30 minutes of operation) of an opacity up to 35 percent, averaged over a six- minute period, as provided for in Rule 62-296.401(7)(a)-(b), Florida Administrative Code. The McPherson model is designed to meet the requirements of the above-referenced rule, and the VE tests run during start-up periods (except one performed by Mr. Soich on April 19, 2002) demonstrated compliance with this requirement. Id. The operating permit limits visible emissions outside of start-up periods (the first 30 minutes of daily operation) to no more that five percent opacity, with visible emissions of up to ten percent opacity allowed up to three minutes in any one hour as provided for in Rule 62-296.401(7)(a), Florida Administrative Code, and 40 Code of Federal Regulations Part 60, Subpart CCCC, adopted and incorporated by reference in Rule 62- 204.800(8)(b)74, Florida Administrative Code. (Rule 62- 296.401(7)(a) permits up to 20 percent opacity. The ten percent rate is required by the new federal standard. See SMG Exhibit 13, page 3 of 9.) The opacity limits in the operating permit are more stringent than those contained in the construction permit, which allows visible emissions of up to 20 percent opacity up to three minutes in any one-hour period. (By definition, a "visible emission" is "[a]n emission greater than 5 percent opacity or 1/4 Ringelmann measured by standard methods." Rule 62-296.200(278), Florida Administrative Code.) The VE test results submitted by SMG demonstrate compliance with the opacity limits in the operating permit and with the opacity limits in the construction permit for the days tested. See Findings of Fact 18, 22, 27, and 29. The operating permit requires that the incinerator must be attended at all times while materials are being burned and that public access to the incinerator must be restricted. A certified operator is in attendance whenever the incinerator is operated, i.e., when something is burning in the incinerator. A fence has been constructed around the property. The operating permit prohibits starting the incinerator before sunrise and requires that all charging of the incinerator be completely stopped before sunset as required by Rule 62- 296.401(7)(h), Florida Administrative Code. Mr. Gerrits testified that the incinerator is never started before sunrise and is typically started after 8:00 a.m. Mr. Gerrits testified that the incinerator is never charged after sunset and that charging typically stops at 4:00 or 5:00 p.m. See Endnote 4. These practices are consistent with the Operations and Maintenance Guide for the incinerator. The operating permit limits the height of the ash in the burning pit to one-third of the depth of the pit or to a point where the ash begins to impede combustion, whichever occurs first as provided in Rule 62-296.401(7)(m), Florida Administrative Code. The one-third depth line is marked on the outside of the incinerator. Mr. Gerrits testified that ash is regularly removed from the burning pit every third day to keep the ash level low, which helps ensure better combustion and reduces smoke. The operating permit provides that material shall not be loaded into the incinerator in such a way that it will protrude above the air curtain. Testimony established that the SMG incinerator is properly loaded. The operating permit requires that all operators of the incinerator be trained in the proper operation and maintenance of the incinerator and that an operations and maintenance guide be maintained at the facility at all times. All of the operators of the SMG incinerator have taken a four-hour training course to learn how to operate the incinerator in accordance with Department regulations and good operating practices, and certificates attesting to that training were submitted with the application for the operating permit. An Operations and Maintenance Guide was submitted with the application for the construction permit. The operating permit requires the maintenance of a daily operating log. The daily operating log must be maintained at the facility for at least five years and must be available for inspection by the Department upon request. SMG currently maintains a daily operating log that meets the requirements of the construction permit. SMG submits those daily logs to the Department on a monthly basis after the Department requested that SMG do so. The log includes a date and site location, daily operating hours, total charges, total material charged in tons, average hourly charging rate, any maintenance performed, fuel usage in gallons, and the operator's signature. The logs of record contain this information and have been initialed by SMG's operator for each day when the incinerator has been operated. SMG operators responsible for preparing the logs have no incentive to indicate the incinerator is not operating on days or during hours when it is running, as a deliberate misstatement on the operating logs could result in enforcement action by the Department and being fired by SMG. The operating permit requires that all reasonable precautions be undertaken to prevent and control the generation of unconfined emissions of particulate matter in accordance with Rule 62-296.320(4)(c), Florida Administrative Code. SMG takes reasonable precautions to prevent and control the generation of unconfined emissions of particulate matter, including paving the road that leads to the incinerator to reduce dust, wetting the ashes removed from the burn pit, wetting the ash piles and ramp that addresses the incinerator, approaching the incinerator at a slow rate, and placing a charge into the incinerator slowly and carefully. SMG voluntarily added a sprinkler system on all four corners of the burning pit that was not contemplated by the construction permit. The Department witness Mr. McDonald testified that this provided an additional method to control unconfined emissions. Although the construction permit and proposed permit do not contain conditions prohibiting the burning of green wood or wet wood waste, SMG takes precautions at the request of Mr. Soich to ensure that the wood is properly dried before being burned. See Finding of Fact 24. This helps to reduce smoke and emissions from the incinerator. (Moisture is the primary factor that inhibits burning and causes smoke and potentially odor.) As part of the routine practice in handling the wood waste before it is burned, trucks bringing wood waste to the incinerator are instructed to dump it into a pile. SMG operators then use a loader to flatten out the pile and remove dirt, prohibited materials, and harvestable pieces of wood. Harvestable pieces of wood and dirt are removed to separate staging areas. The remaining wood waste is separated into long windrows, with the oldest row closest to the incinerator. The windrows are flipped or rolled over in the direction of the incinerator, allowing the waste to dry. The waste in the row closest to the incinerator is burned, and subsequent windrows are rolled over in its place. Ash is generally removed from the burn pit every third day; it is wetted on removal to reduce dust, and the ash piles adjacent to the incinerator are also kept wetted by the sprinkler system. The ash is eventually mixed with the dirt in a composter for use as Class-A unrestricted compost. The SMG operator in charge on a particular day decides whether the incinerator will operate that day, in accordance with standard operational practices. The operator checks the weather forecast. If it is raining or if there are high winds (over 20 miles per hour), the incinerator will not be operated that day, and SMG typically waits four days after a rain to begin operating the incinerator again. These procedures are not contained in any permit conditions. The purpose of not operating during or immediately after a rain and taking steps to ensure the wood is dry is to reduce smoke; wet wood smokes more. Rainy weather can also affect odor. The purpose of not operating during windy conditions is to reduce the possibility of fire on SMG's property, but wind can also affect odor and visible emissions. On days when the incinerator is not operating, SMG conducts yard maintenance, maintains the waste windrows, and runs the composter. The composter is a source of noise and is located adjacent to the incinerator and is run when the incinerator is shut down. To ensure that the visible emission limitations are not exceeded and objectionable odors3 not generated, the operating permit requires that the incinerator's fan shall continue to operate after the last charge of the day until all combustion (presence of any flame or smoke) has ceased. Generally, the incinerator keeps burning an hour to an hour and one-half. Mr. Gerrits testified that the fan is kept running until the flames and smoke die out and that a certified operator is present until the fan is switched off. The operating permit requires that the testing of visible emissions must be conducted within 90-100 percent of the maximum allowable charging rate of 10 tons/hour and shall be conducted when the highest emissions can reasonable be expected to occur.4 Testing of the SMG incinerator was conducted at within 90-100 percent of the maximum allowable charging rate of 10 tons per hour, and the May 30, 2002, test results indicated that the incinerator was operating within the opacity limits of its permit even when operating at close to maximum capacity. Evidence established that the May 30, 2002, VE test complied with the specific conditions of both the construction and operating permit. See Finding of Fact 29. The test method for visible emissions required by both the construction permit and the operating permit is EPA Method 9, adopted and incorporated by reference at Rule 62- 204.800(8)(b)74, Florida Administrative Code. (Method 22 is not required pursuant to Department rules for compliance testing of an air curtain incinerator.) Testimony established that Method 9 was the method used for the VE tests conducted on the SMG incinerator. As required by both the construction and operating permits, the incinerator is located in excess of 300 feet from any pre-existing occupied building located off site as required by Rule 62-296.401(7)(j), Florida Administrative Code. The closest residences, that of Mr. Gerrits' father and his tenant, are approximately 1,500 feet away. Petitioners' Challenge For the most part, Petitioners reside northeast, east, or southeast of the incinerator. One Petitioner resides approximately three-tenths of a mile southeast of the incinerator; others reside at greater distances, up to approximately a mile and one-half away from the incinerator. Each of the Petitioners who testified have resided in this area for many years, pre-dating the operation of the incinerator. The Petitioners who testified were credible and well- intentioned. Each of these Petitioners maintained daily logs covering several months when the incinerator was authorized to operate. Some kept logs for several months, while others kept logs for several days. They noted their observations and perceptions in the logs. Admittedly, Petitioners are not experts in the detection of odors or noise levels. Nevertheless, they recorded their own experiences as to what they saw, heard, and/or smelled, believing that the odors and noise came from the incinerator. Some recorded that they smelled the strong odor of smoke, an "acrid smell," a "pungent smell," for example; "it makes your eyes burn and throat burn" said another during the hearing. One witness described the experience as being a prisoner in his house. Another does not go outside when the smell is bad. Generally, the level of odor varied with the weather conditions, i.e., a stronger odor was noticed on foggy and wet days or nights and when the wind blows from the west, which Petitioners contend is the prevailing wind. Some witnesses only smelled the odor during the night and not during the day, and not all of the time. Some complained about the odor and noise, or one and not the other. Some believed the noise coming from the incinerator was a major problem. At least two witnesses who live approximately three-tenths of a mile and 3,500 feet, respectively, from the incinerator site, described the noise as being like a jet airplane. One witness shuts her windows to keep out the noise. (SMG also operates a "wood chipper" or "composter" on site which is loud. Mr. Gerrits stated that he did not think the sound was the same as made by the incinerator fan. He also stated that "[i]t doesn't exceed the noise decibels. It doesn't exceed background noise levels at [their] property line.") Petitioners documented their concerns which are described, in part, above, and also documented their complaints to the Department and local government. It appears that each of the logs prepared by the Petitioners (who kept logs) were given to Petitioner Martha Futscher, who summarized and compiled a hand-written master list of the complaints. Then, Mr. Harvey inputted this data on the master list (spread sheet) of complaints, which appears as Petitioners' Exhibit F1. The master list contains recorded observations from May 2002 through January 2003. The master list contains a representation of when the incinerator started and stopped for various days and when it was operational or not, and this information was derived, according to Mr. Harvey, from the logs maintained by SMG. The master list also provides tons per hour of waste burned on particular days, the observer's initials, and the approximate distance each observer lived from the incinerator, and the comments, with time of observation or perception noted. There are discrepancies between the master list and the actual logs maintained by SMG as to when the incinerator was operational. There also appears to be several differences in observations between the Petitioners' master list and other evidence which indicates when Mr. Soich inspected the incinerator and determined that the incinerator was operating satisfactorily. Compare Petitioners' Exhibit 2 with Petitioners' Exhibit F1. For example, the master list records an observation from May 30, 2002, when the incinerator was operating, when there was noise and smoke noted at 8:00 a.m., and flames at the incinerator and odor at 5:30 p.m. Conversely, Mr. Soich was on-site on May 30, 2002, and observed the scheduled VE test. No problems were noted with the operation on this date by Mr. Soich. Mr. Soich also noted that "wood waste was properly dry and free of debris." The VE test on May 30, 2002, was performed from 10:29 a.m. to 11:59 a.m. and showed compliance with opacity limits. The master list indicates that black smoke was observed (no time given) on May 7, 2002, when the incinerator was operational, yet Mr. Soich inspected the incinerator on that day and there is a notation in the record that the incinerator was operating between 0-5 percent visible emissions. (Mr. Soich opined that it should be very rare to smell objectionable odors if the visible emissions run at a 5 percent level.) For October 15, 2002, there is a notation in the master list that a Petitioner commented that the incinerator was running during the day ("AM/PM Running") and that there was a strong smell at approximately 7:05 p.m. A strong smell at the person's house was also noted at approximately 9:30 p.m. on that day. However, Mr. Soich performed an annual inspection of the incinerator on October 15, 2002, and there is a notation on the master list, Petitioners' Exhibit 2, that the incinerator was not operating due to recent rain. As one Petitioner testified, her point was that the inspectors are not there when she hears the noise, sees smoke, and smells the odor. Mr. Soich confirmed that he does not inspect the facility in the evening. Petitioners also provided, as evidence in support of their position, six videotapes of the incinerator for September 19, October 3, October 23, November 25 (2 tapes), 2002, and January 10, 2003. (Mr. Harvey took the videotapes from the same location, across the street and west of the incinerator.) Each tape, except for September 19, 2002, showed smoke emanating from the operational incinerator. On September 19, 2002, the incinerator was not running according to the SMG log. There was a malfunction which was reported to the Department. The SMG log indicates that the pit was cleaned out, site cleared and rows moved. There is also a notation in the SMG log for this date that there was a power failure/malfunction at the incinerator at 9:00 a.m., and that the power was out. According to Mr. Gerrits, the malfunction caused smoke. (One Petitioner observed smoke from ashes on September 19, 2002.) While the Petitioners proved that there was smoke emanating from the operation of the incinerator on the days which were videotaped, with the exception of September 19, 2002, this did not necessarily prove that the emissions exceeded the requirements of the Department rules or that there was an objectionable odor emanating therefrom. Mr. Stoich observed the videotapes played during the hearing. In particular, with respect to the January 10, 2003, videotape, Petitioners' Exhibit 12, Mr. Stoich stated that a level of opacity cannot be determined from photographs and videotapes. He also noted that there was "a lot of white smoke," an atypical situation according to him, emanating from the incinerator and that he, as a compliance inspector, would have investigated further and performed an inspection, including a VE test, to determine if there was a violation, had he seen this smoke. However, he stated that without actually seeing the operation, he could not determine whether a violation had occurred. There was persuasive evidence that compliance with the opacity limits of a permit can only be determined through VE tests conducted using the Department-approved EPA Method 9. The VE test takes into account wind, the angle of the plume, the position of the sun, and other factors, and must use appropriate averaging to ensure that the test is valid. A smoke plume can look quite dense at the wrong angle or if the light is reflecting off the plume in a certain way, when in fact it is in compliance with Department rules. The VE tests for the incinerator have, with one exception, see Finding of Fact 24, demonstrated compliance with the opacity limits in the construction permit. As noted herein, upon receipt of notice that one VE test failed, SMG implemented corrective actions, and two VE tests conducted after the time showed the incinerator was operating in compliance with the opacity limits of the permit. See Findings of Fact 27 and 29. The Department relies on its compliance inspectors, such as Mr. Soich, to make a determination of whether an air emission source is causing an objectionable odor. There does not appear to be an approved Department method for measuring odors from incinerators. (Mr. Nelson stated that odors are difficult to test and that "odor is done collecting samples." No samples were taken or analyzed.) On the other hand, Mr. Soich testified that, based on his years of experience, he has developed certain methods for determining whether a facility is emitting an objectionable odor under the rules. If he receives an odor complaint, which he has in this case, he goes to the site and checks the prevailing winds. He also travels around the facility to determine the source of the odor. An odor can be deemed objectionable if it is very strong and overpowering, such that he cannot stay on- site and breathe in the odors. An odor can also be deemed objectionable if, after being on-site for some extended period of time, he begins to develop symptoms such as runny eyes, a scratchy throat, or a headache as a result of the smell. Finally, he may bring along another Department employee to determine whether the other individual finds the odor objectionable. Enforcement actions can be taken if objectionable odors are detected. Mr. Soich testified that he has inspected the incinerator at least nine times in the past year and never detected an objectionable odor. On some of the visits, the incinerator was not operational. On rebuttal, several residents of the area testified that they had not experienced objectionable odors from the incinerator. David Stevens, the Chief of the DeRosa County Fire Department, testified that an open land-clearing burn emits black smoke, more so than he observed from the incinerator. This fire department only had to respond to false alarms at the incinerator. Mr. Stevens personally inspected the operation of the incinerator and thought it was a very safe operation. Randy Morgan, a wildlife firefighter and certified burner with the Division of Forestry with over 16 years of experience in fire control, testified that approximately 50,000 acres of the state land burns occurred in Citrus County last year. These land burns can be a significant source of smoke and odor. In addition, approximately 50 open burn authorizations are issued each day. He also testified that controlled burns of approximately 15 fires of approximately 50 to 2,000 acres a day occurred in 2002 in proximity of the SMG incinerator which is a source of smoke and odor. The state also conducts open burns of some kind approximately ten months out of the year. Other witnesses testified that, given the rural nature of the community, open burning of trash, wood, and leaves occurs on a regular basis. Ultimate Findings of Fact Credible evidence established that SMG meets or exceeds the requirements in the construction permit to reduce smoke, dust, and odor, and these requirements are carried over to the operating permit. Credible evidence established that SMG employs the same, if not better, practices and permit conditions to control smoke, dust, and odor as other air curtain incinerators in the state. Credible evidence established that the SMG incinerator is operated in accordance with its construction permit. Credible evidence established that the SMG incinerator can be expected to be operated in accordance with its operating permit. Credible evidence established that the SMG incinerator is operated in accordance with Department rules. In light of the foregoing, SMG has demonstrated reasonable assurance that its air curtain incinerator has been operated in compliance with the construction permit and that the incinerator can continue to be operated in accordance with the conditions of the operating permit.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Environmental Protection enter a final order granting SMG's application and issuing Permit No. 0170360-002-AO, as amended, and subject to all conditions, including but not limited to the Specific Conditions set forth in the Department's Notice of Intent to Issue, for the operation of an air curtain incinerator in Citrus County, Florida. It is further recommended that Petitioners' challenge to the amendment to the operating permit be dismissed. See Preliminary Statement. DONE AND ENTERED this 21st day of April, 2003, in Tallahassee, Leon County, Florida.5 CHARLES A. STAMPELOS Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 21st day of April, 2003.

Florida Laws (2) 120.569120.57
# 3
BREVARD COUNTY BOARD OF COUNTY COMMISSIONERS (SYKES CREEK INJECTION WELL) vs SLOAN CONSTRUCTION COMPANY, INC., AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 92-001801 (1992)
Division of Administrative Hearings, Florida Filed:Melbourne, Florida Mar. 20, 1992 Number: 92-001801 Latest Update: Jun. 23, 1992

The Issue Sloan Construction Company, Inc. (Sloan) has applied to the Department of Environmental Regulation (DER) for a permit to relocate its drum mix asphalt plant, a source of air emissions, from its current site in Flagler County to Brevard County. The issue in this proceeding is whether that permit should be granted. More specifically, it must be determined whether the proposed activity will meet applicable statutory and regulatory standards. An ancillary issue regarding Respondent, Sloan's entitlement to attorneys fees and costs pursuant to Section 120.57(1)(b)5., F.S. is addressed in a separate order entered this same date.

Findings Of Fact Sloan Construction Company, Inc., (Sloan) is a highway contractor doing business in the southeastern United States. It operates asphalt plants in South Carolina and in Florida; in addition to the portable plant at issue here, its Florida plants, permitted by the Department of Environmental Regulation (DER) are in Jacksonville, St. Augustine, and Orlando. On December 9, 1991, Sloan applied to DER to relocate its portable asphalt plant from Flagler County to Brevard County. The company has a contract with the Florida Department of Transportation for work on I-95 and on A-1-A in Brevard County and needs the plant for that work. This same plant was initially permitted by DER's southwest district office on November 9, 1989 for operation in Highlands County. Pursuant to subsequent permits the plant moved to Lake County in 1990, and to Flagler County in 1991. Each time it was moved, the relevant DER district office reviewed the air pollution impact before granting the permit. The permit will expire in November 1994. A consent order was entered in December 1990 between Sloan and DER regarding violations in May and June 1990. The violations described in the consent order were that visible emissions exceeded 20% opacity, and the metal tanks serving as the scrubber final settling basin were low on water with large amounts of particle flotation. The company paid a fine of $7,750 and made the DER-required changes in its maintenance and operation. The company monitors its own system and makes necessary repairs and improvements when problems are anticipated. When the scrubbers fail to operate properly, they are shut down and fixed. The scrubbers do not involve water discharge as they are a closed circuit system. This permit application is not requesting approval to discharge into the waters of the state. For this permit DER requires annual stack testing to determine whether the plant is meeting air emission limitations for particulates (.04 grains per dry standard cubic foot) and opacity (20%). Sloan retains an engineering consultant, Bottorf and Associates, to conduct those tests. The last stack test, May 1991, indicates that the emissions meet the standards. It is anticipated that this same plant will perform just as well in Brevard County. However, a proposed condition of the new permit is that another stack test be performed within 20 days of commencement of operation, in order to assure that equipment is functioning properly after the move. A condition of the existing permit is that unconfined emissions of particulate matter from vehicular movement, loading, construction or demolition be controlled by paving of traffic areas and the sprinkling of stockpiles with water. Sulphur dioxide is considered to be the pollutant of greatest concern in a facility such as this. Sulphur dioxide is generated from the burning of fuel containing sulphur. The applicant has agreed to reduce sulphur content of its fuel from 1.8% to .5%, and to reduce its sulphur dioxide emission limit from 96 tons per year to 26 tons per year. No DER rule requires air pollution source modelling for an asphalt plant or other minor source (defined as less than 100 tons per year of a single pollutant emission). However, because of the proximity of the proposed facility to the existing Orlando Utilities Commission (OUC) power plant, and public concern about sulphur dioxide emissions in the area, DER air permitting engineer, John Turner, ran SCREEN models to predict the combination of emissions from this proposed facility and other sources in the area. The total projected sulphur dioxide ambient air level from the SCREEN models run by John Turner for the Sloan facility at 26 tons per year included four other local sources, and included a more specific model for the nearby OUC plant, which model considered additional sources. John Turner's modelling yielded 241.63 micrograms/ cubic meter on a 24 hour basis. The ambient air quality standard is 260. John Turner's modelling yielded a conservative estimate, that is, it most likely over-predicted sulphur dioxide levels. The model assumed no reduction in sulphur dioxide from aggregate in asphalt plant dryers; tests actually reflect a 70-89% reduction, and the U.S. Environmental Protection Agency (EPA) assumes a 50% reduction when no tests are available. The model assumed all sources would be operating 24 hours a day, when they actually operate for a more limited period. Moreover, the model assumed all sources would be operating at the same time at their maximum permitted rates. Turner's assumptions also assumed worst case meteorological conditions, such as wind inversions, that would combine plumes from two sources in opposite directions. In the OUC model used by Turner a worst case sulphur dioxide background of 44 was assumed when the normal background level would be much lower. "Downwash" is the effect of wind hitting a large, generally flat, structure or impediment, rising to go over the top and then dropping---an effect which would cause a pollution plume to drop to the earth more quickly. The County's expert conceded that John Turner's modelling was conducted properly, but criticized the model for failing to consider downwash. John Turner and his supervisor, Allen Zahm, did consider downwash but they suggest that it would lower, not raise, the ambient air level, as downwash tends to retain the concentration closer to the stack. The County's expert stated that he did not know that downwash would actually occur on the site. As provided in the permit conditions, the applicant intends to use "on specification" used oil for fuel. "On-specification" used oil must meet standards not to exceed certain allowable levels for arsenic, cadmium, chromium and other substances. There is no allowable level of PCB; that is, the standard level is zero. The sulphur and heavy metal content of the fuel is monitored through certificates of quality required by DER. Sloan has complied with the permit requirements as to its fuel quality. The proposed site for the facility is in Delespine, north of Cocoa in Brevard County, near Highway U.S. 1 and near the Indian River Lagoon. The plant will be approximately 700 meters southwest of an existing mid-sized power plant, OUC, and approximately a mile northwest of a Florida Power and Light Company power plant. Adjacent to the site is a large residential community, Port St. John, with approximately 18,000 residents. The community has expanded rapidly as a result of the availability of affordable housing, and it includes a mix of elderly citizens and young families with children. The residents are genuinely and sincerely concerned for their health and safety and the character of their neighborhoods. They provided anecdotal testimony of increased respiratory problems and negative environmental impacts which they attribute to the power plants and other industrial uses in the area. They are concerned about increased traffic and problems of evacuation in the event of an emergency. They are worried that the traffic and emissions from the proposed facility will cause special problems for students at the nearby elementary schools. As real and sincere as those concerns are, they do not overcome the substantial evidence presented by the applicant that the proposed permit meets the specific requirements of the responsible state agency. The citizens' concerns are classic land use issues, which through zoning and land use regulation, are the jurisdiction of their local governments.

Recommendation Based on the foregoing, it is hereby, recommended that the Department grant Sloan's application to amend its operating permit for its asphalt plant (Permit No. 167794) with the change in permit conditions as noticed by the Department (Sloan Ex. #27), and with the condition, as stipulated, that the stack for air emissions from the facility will be 42.5 feet in height above ground level. RECOMMENDED this 22nd day of June, 1992, in Tallahassee, Leon County, Florida. MARY CLARK Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904)488-9675 Filed with the Clerk of the Division of Administrative Hearings this 22nd day of June, 1992. COPIES FURNISHED: Petitioners #92-1801 Thomas Lanham Asst. County Attorney Brevard County Attorney's Office Building C, Suite 346 2725 St. Johns Street Melbourne, FL 32940 #92-1802 Joseph & Katherine Tidwell 4000 Delespine Road Cocoa, FL 32927 #92-1803 Carol L. Harris 6040 Gilson Avenue Cocoa, FL 32927 #92-1804 Harry S. Rice 931 Galleon Street Cocoa, FL 32927 #92-1805 Joseph F. DeBarry 950 Galleon Street Cocoa, FL 32927 #92-1806, 92-1807, 92-1813 (Counsel for Port St. John Homeowners Assn., Jessie Fleming, & Don L. Williams) F. Michael Driscoll, Esquire 1530 S. Federal Highway Rockledge, FL 32955 #92-1808 Bea Polk 101 River Park Blvd. Titusville, FL 32780 #92-1809 Russell Harris 6040 Gilson Avenue Cocoa, FL 32927 #92-1811 Opal Hall 7655 South U.S. 1 - Lot 17 Titusville, FL 32780 #92-1812 John Ferguson 7020 Song Drive Cocoa, FL 32927 #92-1814 First Baptist Church of Port St. John Joseph E. Tidwell 4000 Delespine Road Cocoa, FL 32927 #92-1815 David & Rhonda Tidwell 4530 Robert Street Cocoa, FL 32927 #92-1816 Felicia Cardone, et al. 7230 N. U.S. Hwy. 1, #106 Cocoa, FL 32927 #92-2471 James M. Shellenberger, et al. Sunrise Village Condominium 7040 N. U.S. Hwy. 1, Unit #101 Cocoa, FL 32927 Respondents (for Sloan Construction Company, Inc.) F. Alan Cummings, Esquire Michael Riley, Esquire P.O. Box 589 Tallahassee, FL 32302 (for DER) Douglas H. MacLaughlin, Esquire DER-Twin Towers Office Building 2600 Blair Stone Road Tallahassee, FL 32399-2400 Carol Browner, Secretary DER-Twin Towers Office Building 2600 Blair Stone Road Tallahassee, FL 32399-2400 Daniel H. Thompson, General Counsel DER-Twin Towers Office Building 2600 Blair Stone Road Tallahassee, FL 32399-2400

USC (1) 40 CFR 60.90 Florida Laws (3) 120.56120.57403.031
# 4
DOROTHY HAZZARD vs S.M.G., INC. AND DEPARTMENT OF ENVIRONMENTAL PROTECTION, 02-003826 (2002)
Division of Administrative Hearings, Florida Filed:Crystal River, Florida Sep. 19, 2002 Number: 02-003826 Latest Update: Jun. 03, 2003

The Issue The issue presented is whether Respondent, S.M.G., Inc. (SMG), has provided reasonable assurance that its existing air curtain incinerator will be operated in accordance with applicable statutory and rule provisions.

Findings Of Fact The Parties The Department is the state agency responsible for receiving applications for, and the issuance of, permits for the construction and operation of air curtain incinerators in the State of Florida. SMG is a contracting company, with residential, trucking, agricultural, and commercial driver's license divisions. SMG is the applicant for a permit to operate an air curtain incinerator. Petitioners reside in Citrus County, Florida, in the vicinity of the constructed and operational air curtain incinerator. For the most part, Petitioners reside northeast, east, or southeast of the site. The Petitioners demonstrated their standing in this proceeding. SMG's Construction Permit On May 23, 2001, SMG submitted an application for an air construction permit to the Department's Southwest District Office. The application sought authorization to construct an air curtain incinerator "[o]n the east or west side of 6844 N. Citrus Avenue, Crystal River," Citrus County, Florida. 1 The general purpose of pursuing this permit was to burn wood waste. On July 9, 2001, the Department issued SMG a Notice of Intent to Issue the Proposed Air Construction Permit (Permit No. 0170360-001-AC). A copy of the Notice of Intent was published in the Citrus Times in Citrus County on July 19, 2001. On August 6, 2001, the Department issued SMG an air construction permit for the proposed air curtain incinerator. The construction permit authorized the construction of a McPherson Systems, Inc. - Model M30E air curtain destructor (incinerator) with under fire air at a natural non-Title V facility. Pursuant to the terms of the construction permit, in November 2001, SMG constructed an air curtain incinerator on approximately 500 acres of land on the east side of State Route 495 north of Crystal River in Citrus County, Florida, on property owned by the Gerrits family. See Endnote 1. Pursuant to the construction permit, SMG installed a McPherson Systems, Inc. - Model M30E air curtain incinerator with under fire air, a refractory lined burning pit, three upper chamber refractory lined walls (ten feet high), and a stainless steel spark arrester screen. The manifold blower and under fire air fans are powered by an electric engine. The manufacture designs and specifications for the McPherson model were submitted with the application for the air construction permit and admitted in evidence. Construction of a portable air curtain incinerator with a blower/fan system powered by a diesel-fired engine was contemplated by the air construction permit. Although cheaper, SMG instead chose to install the McPherson model that would produce the cleanest burn, i.e., one with fewer emissions, that was operated by electricity. The McPherson model used by SMG is recognized as an efficient, reliable model of air curtain incinerator. The diesel-fired blower/fan/engine system contemplated by the construction permit is considered exempt from permitting. An engine operated by electricity has no emissions and therefore does not require an air permit from the Department. The Department could not require a permit for the blower/fan system alone. The operating permit supercedes the construction permit, except as amended. Testing after Construction of the Incinerator On November 23, 2001, SMG began operating the air curtain incinerator. Pursuant to Special Condition 22 of the air construction permit, an initial visible emissions (VE) (opacity test) compliance test was performed on November 23, 2001, by Bernard A. Ball, Jr., an environmental engineer with Southern Environmental Services, Inc. The results of the initial VE compliance test were within the opacity limits contained in the construction permit. Specific Condition 19 of the construction permit requires SMG to maintain daily operating logs of the air curtain incinerator's daily operations. In order to obtain an air operating permit, a permit applicant is required to demonstrate compliance with the Department's rules and with the conditions of the construction permit. The Department requires an applicant for an operating permit to submit copies of recent daily operating records for the facility and copies of the emissions test required by the construction permit. These operating records are submitted in order for the Department to determine whether the applicant is complying with the applicable emissions standards and that the applicant is, in fact, maintaining the required operating logs as required by the construction permit. In order for SMG to obtain the operating permit for the incinerator, Specific Condition 28 of the construction permit required SMG to file an application for an air operating permit with the Department within 45 days of testing and required the application to include a copy of the VE test report and copies of at least two recent weeks of daily operating logs. On March 14, 2002, a second VE test was conducted by Mr. Ball, which also indicated that emissions were within the construction permit's opacity limits. On April 1, 2002, SMG submitted its application for the air operation permit to the Department. The application was signed by Sean Gerrits, and contained copies of the VE test reports for the November 2001 and March 2002 tests, as well as three and one-half months of daily operating logs, certificates showing that the incinerator operators were trained, and photographs of the incinerator in operation. SMG submitted the documentation required under the construction permit. On April 19, 2002, Robert E. Soich, Jr., air compliance inspector for the Department's Southwest District Office, performed an unannounced inspection and conducted a VE test in response to a complaint by Mr. Leonard Kaplan (a Petitioner), complaining of odors present. Excessive visible emissions were observed by Mr. Soich on April 19, 2002. The incinerator did not pass the VE test because of the improper alignment of the blade angle on the manifold of the blower system and because of green leaves and inadequate drying of the materials to be burned in the incinerator. Mr. Soich also observed, in part, that "materials need to be prepared better for burning." As a result of this unannounced inspection and the negative VE test, the Department requested SMG to provide an explanation of the VE test results and of the type of changes SMG planned to implement to correct the problem. On learning of the problem, SMG shut down the incinerator and called a McPherson mechanical contractor to come out and adjust the blade angle. Southern Environmental Services conducted another VE test to ensure the problem had been corrected. On April 22, 2002, a VE test was conducted by Southern Environmental Services on-site which showed compliance with the construction permit. On April 30, 2002, SMG advised the Department that adjustments were made to the baffles to correct the angles. SMG provided the Department with the April 22, 2002, VE test results. SMG also implemented better operational procedures. On May 30, 2002, with Mr. Soich present, SMG, by Byron E. Nelson, performed another VE test. The test results showed compliance with the opacity limits in the construction permit and the results were submitted to the Department.2 Mr. Nelson, an environmental engineer with Southern Environmental Sciences, testified that he has been involved in preparing approximately two dozen applications for air curtain incinerators and has conducted probably "thousands" of visible emissions tests. Mr. Nelson is certified by the State of Florida to conduct VE tests. He has seen "two or three dozen" air curtain incinerators in operation and has conducted VE tests on about 20 of them. Based on his experience, Mr. Nelson testified that SMG employed the same practices and controls to control odor, smoke, and fugitive emissions as other such incinerators he is familiar with. He testified that the amount of smoke and odors from the SMG incinerator is similar to that emitted from other air curtain incinerators, and that the fugitive emissions from the SMG incinerator were probably less than others he is familiar with. Based on his experience, Mr. Nelson opined that SMG has taken reasonable measures to minimize odor, smoke and dust/particulates from the operation of the incinerator. Mr. Nelson likewise opined that the SMG incinerator is well run, perhaps better run than other incinerators. (Mr. Nelson had been on the SMG site twice when the incinerator was operating and burning wood products.) Based on his experience, Mr. Nelson opined that SMG meets the requirements necessary to obtain an air operating permit from the Department and has demonstrated that it has complied with the conditions of its construction permit. Mr. Soich is the air compliance inspector for the Department's Southwest District Office. He testified that he has inspected the operations of other air curtain incinerators over the last 15 years. Mr. Soich testified that SMG is one of the "better operators" of air curtain incinerators he is familiar with. (Mr. Soich visited the SMG site approximately nine times from March 13, 2002, to October 15, 2002.) Mr. McDonald is the Air Permitting Engineer for the Southwest District Office of the Department. He is responsible for reviewing all applications for air curtain incinerators in the Southwest District and has reviewed applications for between 25 and 30 incinerators. Mr. McDonald reviewed the SMG permit applications. Based on the latest VE test results, copies of the records attached to the operating permit application, and his experience, Mr. McDonald, for the Department, determined that SMG had demonstrated compliance with the conditions of the construction permit and recommended issuance of the operating permit for the incinerator. He maintained the same position at hearing. SMG provided assurance that the DeRosa Fire Department would respond in the event of a fire at the incinerator. On June 19, 2002, the Department issued the proposed air operating permit. Operation of the Air Curtain Incinerator Emissions from the incinerator are controlled by a curtain of forced air at a very high static pressure over and around the burning pit. The air curtain traps smoke and small particles and recirculates them to enhance combustion and reduce smoke. The underfire air introduces air underneath the air curtain to ensure complete combustion and minimize opacity at start-up. The refractory-tiled ceramic concrete burn pit provides a safe combustion chamber, and the refractory panels keep excess heat from escaping. The upper chamber refractory panels, which surround three sides of the burn pit, allow more retention time in the burner to better control opacity and sparks. The stainless screen spark arrestor also controls sparks and debris from leaving the burner. The operating permit application proposed the use of an air curtain blower along with a manifold to provide forced air to the burning pit. According to the manufacturer specifications, the blower can force air into the pit at velocities of between 100 and 120 mph. This ensures that the flames in the burn pit receive enough oxygen to combust completely. The air circulates inside the burn pit to ensure a complete burn, which reduces smoke and odor. The combustion temperature for the burning pit ranges from approximately 1,800 to 2,500 degrees Fahrenheit. The operating permit allows a maximum charging rate of ten tons per hour on a daily average basis and 31,200 tons per any consecutive 12 month period. The incinerator has been operating below the maximum charging rate. The operating permit limits the hours of operation (charging) to 3,120 hours per year, i.e., ten hours/day, six days/week, 52 weeks/year. According to various SMG operating and maintenance logs, the incinerator has been operated below this limit. The operating permit, in accordance with Rule 62- 296.401(7), Florida Administrative Code, allows the burning of only wood waste, yard waste, and clean lumber, and prohibits the burning/incineration of materials such as sawdust, paper, trash, tires, garbage, rubber material, plastics, liquid wastes, Bunker C residual oil, roofing materials, tar, asphalt, railroad cross ties, or other creosoted lumber, chemically treated or painted wood, and other similar materials. Biological waste shall not be burned in the incinerator. During its operation, the incinerator only burned wood and yard waste, and Mr. Gerrits testified that the waste materials are inspected before being burned in order to ensure that no prohibited materials are burned. If any non-authorized materials are observed, they are removed before the waste is burned. See Finding of Fact 24. The operating permit allows visible emissions during start-up periods (not to exceed the first 30 minutes of operation) of an opacity up to 35 percent, averaged over a six- minute period, as provided for in Rule 62-296.401(7)(a)-(b), Florida Administrative Code. The McPherson model is designed to meet the requirements of the above-referenced rule, and the VE tests run during start-up periods (except one performed by Mr. Soich on April 19, 2002) demonstrated compliance with this requirement. Id. The operating permit limits visible emissions outside of start-up periods (the first 30 minutes of daily operation) to no more that five percent opacity, with visible emissions of up to ten percent opacity allowed up to three minutes in any one hour as provided for in Rule 62-296.401(7)(a), Florida Administrative Code, and 40 Code of Federal Regulations Part 60, Subpart CCCC, adopted and incorporated by reference in Rule 62- 204.800(8)(b)74, Florida Administrative Code. (Rule 62- 296.401(7)(a) permits up to 20 percent opacity. The ten percent rate is required by the new federal standard. See SMG Exhibit 13, page 3 of 9.) The opacity limits in the operating permit are more stringent than those contained in the construction permit, which allows visible emissions of up to 20 percent opacity up to three minutes in any one-hour period. (By definition, a "visible emission" is "[a]n emission greater than 5 percent opacity or 1/4 Ringelmann measured by standard methods." Rule 62-296.200(278), Florida Administrative Code.) The VE test results submitted by SMG demonstrate compliance with the opacity limits in the operating permit and with the opacity limits in the construction permit for the days tested. See Findings of Fact 18, 22, 27, and 29. The operating permit requires that the incinerator must be attended at all times while materials are being burned and that public access to the incinerator must be restricted. A certified operator is in attendance whenever the incinerator is operated, i.e., when something is burning in the incinerator. A fence has been constructed around the property. The operating permit prohibits starting the incinerator before sunrise and requires that all charging of the incinerator be completely stopped before sunset as required by Rule 62- 296.401(7)(h), Florida Administrative Code. Mr. Gerrits testified that the incinerator is never started before sunrise and is typically started after 8:00 a.m. Mr. Gerrits testified that the incinerator is never charged after sunset and that charging typically stops at 4:00 or 5:00 p.m. See Endnote 4. These practices are consistent with the Operations and Maintenance Guide for the incinerator. The operating permit limits the height of the ash in the burning pit to one-third of the depth of the pit or to a point where the ash begins to impede combustion, whichever occurs first as provided in Rule 62-296.401(7)(m), Florida Administrative Code. The one-third depth line is marked on the outside of the incinerator. Mr. Gerrits testified that ash is regularly removed from the burning pit every third day to keep the ash level low, which helps ensure better combustion and reduces smoke. The operating permit provides that material shall not be loaded into the incinerator in such a way that it will protrude above the air curtain. Testimony established that the SMG incinerator is properly loaded. The operating permit requires that all operators of the incinerator be trained in the proper operation and maintenance of the incinerator and that an operations and maintenance guide be maintained at the facility at all times. All of the operators of the SMG incinerator have taken a four-hour training course to learn how to operate the incinerator in accordance with Department regulations and good operating practices, and certificates attesting to that training were submitted with the application for the operating permit. An Operations and Maintenance Guide was submitted with the application for the construction permit. The operating permit requires the maintenance of a daily operating log. The daily operating log must be maintained at the facility for at least five years and must be available for inspection by the Department upon request. SMG currently maintains a daily operating log that meets the requirements of the construction permit. SMG submits those daily logs to the Department on a monthly basis after the Department requested that SMG do so. The log includes a date and site location, daily operating hours, total charges, total material charged in tons, average hourly charging rate, any maintenance performed, fuel usage in gallons, and the operator's signature. The logs of record contain this information and have been initialed by SMG's operator for each day when the incinerator has been operated. SMG operators responsible for preparing the logs have no incentive to indicate the incinerator is not operating on days or during hours when it is running, as a deliberate misstatement on the operating logs could result in enforcement action by the Department and being fired by SMG. The operating permit requires that all reasonable precautions be undertaken to prevent and control the generation of unconfined emissions of particulate matter in accordance with Rule 62-296.320(4)(c), Florida Administrative Code. SMG takes reasonable precautions to prevent and control the generation of unconfined emissions of particulate matter, including paving the road that leads to the incinerator to reduce dust, wetting the ashes removed from the burn pit, wetting the ash piles and ramp that addresses the incinerator, approaching the incinerator at a slow rate, and placing a charge into the incinerator slowly and carefully. SMG voluntarily added a sprinkler system on all four corners of the burning pit that was not contemplated by the construction permit. The Department witness Mr. McDonald testified that this provided an additional method to control unconfined emissions. Although the construction permit and proposed permit do not contain conditions prohibiting the burning of green wood or wet wood waste, SMG takes precautions at the request of Mr. Soich to ensure that the wood is properly dried before being burned. See Finding of Fact 24. This helps to reduce smoke and emissions from the incinerator. (Moisture is the primary factor that inhibits burning and causes smoke and potentially odor.) As part of the routine practice in handling the wood waste before it is burned, trucks bringing wood waste to the incinerator are instructed to dump it into a pile. SMG operators then use a loader to flatten out the pile and remove dirt, prohibited materials, and harvestable pieces of wood. Harvestable pieces of wood and dirt are removed to separate staging areas. The remaining wood waste is separated into long windrows, with the oldest row closest to the incinerator. The windrows are flipped or rolled over in the direction of the incinerator, allowing the waste to dry. The waste in the row closest to the incinerator is burned, and subsequent windrows are rolled over in its place. Ash is generally removed from the burn pit every third day; it is wetted on removal to reduce dust, and the ash piles adjacent to the incinerator are also kept wetted by the sprinkler system. The ash is eventually mixed with the dirt in a composter for use as Class-A unrestricted compost. The SMG operator in charge on a particular day decides whether the incinerator will operate that day, in accordance with standard operational practices. The operator checks the weather forecast. If it is raining or if there are high winds (over 20 miles per hour), the incinerator will not be operated that day, and SMG typically waits four days after a rain to begin operating the incinerator again. These procedures are not contained in any permit conditions. The purpose of not operating during or immediately after a rain and taking steps to ensure the wood is dry is to reduce smoke; wet wood smokes more. Rainy weather can also affect odor. The purpose of not operating during windy conditions is to reduce the possibility of fire on SMG's property, but wind can also affect odor and visible emissions. On days when the incinerator is not operating, SMG conducts yard maintenance, maintains the waste windrows, and runs the composter. The composter is a source of noise and is located adjacent to the incinerator and is run when the incinerator is shut down. To ensure that the visible emission limitations are not exceeded and objectionable odors3 not generated, the operating permit requires that the incinerator's fan shall continue to operate after the last charge of the day until all combustion (presence of any flame or smoke) has ceased. Generally, the incinerator keeps burning an hour to an hour and one-half. Mr. Gerrits testified that the fan is kept running until the flames and smoke die out and that a certified operator is present until the fan is switched off. The operating permit requires that the testing of visible emissions must be conducted within 90-100 percent of the maximum allowable charging rate of 10 tons/hour and shall be conducted when the highest emissions can reasonable be expected to occur.4 Testing of the SMG incinerator was conducted at within 90-100 percent of the maximum allowable charging rate of 10 tons per hour, and the May 30, 2002, test results indicated that the incinerator was operating within the opacity limits of its permit even when operating at close to maximum capacity. Evidence established that the May 30, 2002, VE test complied with the specific conditions of both the construction and operating permit. See Finding of Fact 29. The test method for visible emissions required by both the construction permit and the operating permit is EPA Method 9, adopted and incorporated by reference at Rule 62- 204.800(8)(b)74, Florida Administrative Code. (Method 22 is not required pursuant to Department rules for compliance testing of an air curtain incinerator.) Testimony established that Method 9 was the method used for the VE tests conducted on the SMG incinerator. As required by both the construction and operating permits, the incinerator is located in excess of 300 feet from any pre-existing occupied building located off site as required by Rule 62-296.401(7)(j), Florida Administrative Code. The closest residences, that of Mr. Gerrits' father and his tenant, are approximately 1,500 feet away. Petitioners' Challenge For the most part, Petitioners reside northeast, east, or southeast of the incinerator. One Petitioner resides approximately three-tenths of a mile southeast of the incinerator; others reside at greater distances, up to approximately a mile and one-half away from the incinerator. Each of the Petitioners who testified have resided in this area for many years, pre-dating the operation of the incinerator. The Petitioners who testified were credible and well- intentioned. Each of these Petitioners maintained daily logs covering several months when the incinerator was authorized to operate. Some kept logs for several months, while others kept logs for several days. They noted their observations and perceptions in the logs. Admittedly, Petitioners are not experts in the detection of odors or noise levels. Nevertheless, they recorded their own experiences as to what they saw, heard, and/or smelled, believing that the odors and noise came from the incinerator. Some recorded that they smelled the strong odor of smoke, an "acrid smell," a "pungent smell," for example; "it makes your eyes burn and throat burn" said another during the hearing. One witness described the experience as being a prisoner in his house. Another does not go outside when the smell is bad. Generally, the level of odor varied with the weather conditions, i.e., a stronger odor was noticed on foggy and wet days or nights and when the wind blows from the west, which Petitioners contend is the prevailing wind. Some witnesses only smelled the odor during the night and not during the day, and not all of the time. Some complained about the odor and noise, or one and not the other. Some believed the noise coming from the incinerator was a major problem. At least two witnesses who live approximately three-tenths of a mile and 3,500 feet, respectively, from the incinerator site, described the noise as being like a jet airplane. One witness shuts her windows to keep out the noise. (SMG also operates a "wood chipper" or "composter" on site which is loud. Mr. Gerrits stated that he did not think the sound was the same as made by the incinerator fan. He also stated that "[i]t doesn't exceed the noise decibels. It doesn't exceed background noise levels at [their] property line.") Petitioners documented their concerns which are described, in part, above, and also documented their complaints to the Department and local government. It appears that each of the logs prepared by the Petitioners (who kept logs) were given to Petitioner Martha Futscher, who summarized and compiled a hand-written master list of the complaints. Then, Mr. Harvey inputted this data on the master list (spread sheet) of complaints, which appears as Petitioners' Exhibit F1. The master list contains recorded observations from May 2002 through January 2003. The master list contains a representation of when the incinerator started and stopped for various days and when it was operational or not, and this information was derived, according to Mr. Harvey, from the logs maintained by SMG. The master list also provides tons per hour of waste burned on particular days, the observer's initials, and the approximate distance each observer lived from the incinerator, and the comments, with time of observation or perception noted. There are discrepancies between the master list and the actual logs maintained by SMG as to when the incinerator was operational. There also appears to be several differences in observations between the Petitioners' master list and other evidence which indicates when Mr. Soich inspected the incinerator and determined that the incinerator was operating satisfactorily. Compare Petitioners' Exhibit 2 with Petitioners' Exhibit F1. For example, the master list records an observation from May 30, 2002, when the incinerator was operating, when there was noise and smoke noted at 8:00 a.m., and flames at the incinerator and odor at 5:30 p.m. Conversely, Mr. Soich was on-site on May 30, 2002, and observed the scheduled VE test. No problems were noted with the operation on this date by Mr. Soich. Mr. Soich also noted that "wood waste was properly dry and free of debris." The VE test on May 30, 2002, was performed from 10:29 a.m. to 11:59 a.m. and showed compliance with opacity limits. The master list indicates that black smoke was observed (no time given) on May 7, 2002, when the incinerator was operational, yet Mr. Soich inspected the incinerator on that day and there is a notation in the record that the incinerator was operating between 0-5 percent visible emissions. (Mr. Soich opined that it should be very rare to smell objectionable odors if the visible emissions run at a 5 percent level.) For October 15, 2002, there is a notation in the master list that a Petitioner commented that the incinerator was running during the day ("AM/PM Running") and that there was a strong smell at approximately 7:05 p.m. A strong smell at the person's house was also noted at approximately 9:30 p.m. on that day. However, Mr. Soich performed an annual inspection of the incinerator on October 15, 2002, and there is a notation on the master list, Petitioners' Exhibit 2, that the incinerator was not operating due to recent rain. As one Petitioner testified, her point was that the inspectors are not there when she hears the noise, sees smoke, and smells the odor. Mr. Soich confirmed that he does not inspect the facility in the evening. Petitioners also provided, as evidence in support of their position, six videotapes of the incinerator for September 19, October 3, October 23, November 25 (2 tapes), 2002, and January 10, 2003. (Mr. Harvey took the videotapes from the same location, across the street and west of the incinerator.) Each tape, except for September 19, 2002, showed smoke emanating from the operational incinerator. On September 19, 2002, the incinerator was not running according to the SMG log. There was a malfunction which was reported to the Department. The SMG log indicates that the pit was cleaned out, site cleared and rows moved. There is also a notation in the SMG log for this date that there was a power failure/malfunction at the incinerator at 9:00 a.m., and that the power was out. According to Mr. Gerrits, the malfunction caused smoke. (One Petitioner observed smoke from ashes on September 19, 2002.) While the Petitioners proved that there was smoke emanating from the operation of the incinerator on the days which were videotaped, with the exception of September 19, 2002, this did not necessarily prove that the emissions exceeded the requirements of the Department rules or that there was an objectionable odor emanating therefrom. Mr. Stoich observed the videotapes played during the hearing. In particular, with respect to the January 10, 2003, videotape, Petitioners' Exhibit 12, Mr. Stoich stated that a level of opacity cannot be determined from photographs and videotapes. He also noted that there was "a lot of white smoke," an atypical situation according to him, emanating from the incinerator and that he, as a compliance inspector, would have investigated further and performed an inspection, including a VE test, to determine if there was a violation, had he seen this smoke. However, he stated that without actually seeing the operation, he could not determine whether a violation had occurred. There was persuasive evidence that compliance with the opacity limits of a permit can only be determined through VE tests conducted using the Department-approved EPA Method 9. The VE test takes into account wind, the angle of the plume, the position of the sun, and other factors, and must use appropriate averaging to ensure that the test is valid. A smoke plume can look quite dense at the wrong angle or if the light is reflecting off the plume in a certain way, when in fact it is in compliance with Department rules. The VE tests for the incinerator have, with one exception, see Finding of Fact 24, demonstrated compliance with the opacity limits in the construction permit. As noted herein, upon receipt of notice that one VE test failed, SMG implemented corrective actions, and two VE tests conducted after the time showed the incinerator was operating in compliance with the opacity limits of the permit. See Findings of Fact 27 and 29. The Department relies on its compliance inspectors, such as Mr. Soich, to make a determination of whether an air emission source is causing an objectionable odor. There does not appear to be an approved Department method for measuring odors from incinerators. (Mr. Nelson stated that odors are difficult to test and that "odor is done collecting samples." No samples were taken or analyzed.) On the other hand, Mr. Soich testified that, based on his years of experience, he has developed certain methods for determining whether a facility is emitting an objectionable odor under the rules. If he receives an odor complaint, which he has in this case, he goes to the site and checks the prevailing winds. He also travels around the facility to determine the source of the odor. An odor can be deemed objectionable if it is very strong and overpowering, such that he cannot stay on- site and breathe in the odors. An odor can also be deemed objectionable if, after being on-site for some extended period of time, he begins to develop symptoms such as runny eyes, a scratchy throat, or a headache as a result of the smell. Finally, he may bring along another Department employee to determine whether the other individual finds the odor objectionable. Enforcement actions can be taken if objectionable odors are detected. Mr. Soich testified that he has inspected the incinerator at least nine times in the past year and never detected an objectionable odor. On some of the visits, the incinerator was not operational. On rebuttal, several residents of the area testified that they had not experienced objectionable odors from the incinerator. David Stevens, the Chief of the DeRosa County Fire Department, testified that an open land-clearing burn emits black smoke, more so than he observed from the incinerator. This fire department only had to respond to false alarms at the incinerator. Mr. Stevens personally inspected the operation of the incinerator and thought it was a very safe operation. Randy Morgan, a wildlife firefighter and certified burner with the Division of Forestry with over 16 years of experience in fire control, testified that approximately 50,000 acres of the state land burns occurred in Citrus County last year. These land burns can be a significant source of smoke and odor. In addition, approximately 50 open burn authorizations are issued each day. He also testified that controlled burns of approximately 15 fires of approximately 50 to 2,000 acres a day occurred in 2002 in proximity of the SMG incinerator which is a source of smoke and odor. The state also conducts open burns of some kind approximately ten months out of the year. Other witnesses testified that, given the rural nature of the community, open burning of trash, wood, and leaves occurs on a regular basis. Ultimate Findings of Fact Credible evidence established that SMG meets or exceeds the requirements in the construction permit to reduce smoke, dust, and odor, and these requirements are carried over to the operating permit. Credible evidence established that SMG employs the same, if not better, practices and permit conditions to control smoke, dust, and odor as other air curtain incinerators in the state. Credible evidence established that the SMG incinerator is operated in accordance with its construction permit. Credible evidence established that the SMG incinerator can be expected to be operated in accordance with its operating permit. Credible evidence established that the SMG incinerator is operated in accordance with Department rules. In light of the foregoing, SMG has demonstrated reasonable assurance that its air curtain incinerator has been operated in compliance with the construction permit and that the incinerator can continue to be operated in accordance with the conditions of the operating permit.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Environmental Protection enter a final order granting SMG's application and issuing Permit No. 0170360-002-AO, as amended, and subject to all conditions, including but not limited to the Specific Conditions set forth in the Department's Notice of Intent to Issue, for the operation of an air curtain incinerator in Citrus County, Florida. It is further recommended that Petitioners' challenge to the amendment to the operating permit be dismissed. See Preliminary Statement. DONE AND ENTERED this 21st day of April, 2003, in Tallahassee, Leon County, Florida.5 CHARLES A. STAMPELOS Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 21st day of April, 2003.

Florida Laws (2) 120.569120.57
# 5
PATRICIA D'HONDT vs CONSTRUCTION BURNING, INC., AND DEPARTMENT OF ENVIRONMENTAL PROTECTION, 95-004817 (1995)
Division of Administrative Hearings, Florida Filed:Fort Myers, Florida Oct. 02, 1995 Number: 95-004817 Latest Update: Jul. 08, 1996

Findings Of Fact On June 8, 1995, Respondent Construction Burning, Inc. (Applicant) filed an application with Respondent Department of Environmental Protection (DEP) for the construction of a McPherson Systems, Inc. Model M40B Air Curtain Incinerator with a Model M16ACD Blower (Model 40). The application states that Applicant would use the Model 40 air curtain incinerator (ACI) "to combust and destroy landscape debris such as leaves, limbs, trunks, tree clippings, brush, pallets and clean wood that [Applicant] accepts from outside landscaping contractors." An ACI encloses a fire with four walls. The operator adds combustible material to the fire from an open top. The air curtain is an air stream generated by blowers directed over the fire. The air curtain helps the fire maintain the high temperatures required for effective combustion. The air curtain also creates a barrier to trap materials in the incinerator until more completely burned. In these ways, the ACI reduces emissions from the incinerator Petitioner proposes in the application the construction of a refractory walled burning pit 40 feet long, 12 feet wide, and 15 feet deep with blowers above and beneath the fire. The blower beneath the fire would help maintain high temperatures in the fire. The Model 40 ACI that is the subject of the application adds three ten-foot upper chamber walls, which assist in maintaining the integrity of the air curtain above the fire. The Model 40 ACI also features a fine-meshed cage to trap particulates and ash. The application states that the Model 40 ACI would reach temperatures from 2000 to 2500 degrees Fahrenheit and would have a maximum incineration rate of 25 tons per hour of clean landclearing or landscaping debris, producing 1000 pounds per hour of sanitary ash. The application requests a permit to operate the Model 40 ACI 9.5 hours daily, five days a week. The application assures that, in terms of visible emissions, the Model 40 ACI would generate only 5 percent opacity, except for 35 percent opacity in the 30-minute startup period. On August 31, 1995, DEP issued its Intent to Issue. The permit notes that this is the second ACI at the site. Specific Condition 4 prohibits the facility from storing more combustible material than can be burned in 30 days during normal operating hours. If either unit becomes inoperative, Specific Condition 4 requires that the facility stop accepting material after it reaches 6000 tons onsite, until the onsite material is reduced to less than 5600 tons. Specific Condition 9 requires that Applicant discontinue use of the Model 40 ACI anytime that it is performing inadequately due to overloading, neglect, or other reasons. Specific Condition 12 sets the maximum burning rate at 50,000 tons per hour. Specific Conditions 13 and 14 address visible emissions. Specific Condition 13 prohibits no more than five percent opacity outside of startup, except that opacity up to 20 percent is allowed for not more than three minutes in any one hour. Specific Condition 14 allows opacity of up to 35 percent averaged over a six-minute period during startup, which is the first 30 minutes of operation. Specific Condition 15 limits the materials to be burned in the Model 40 ACI to "wood wastes consisting of trees, logs, large brush, stumps relatively free of soil, unbagged leaves and yard trash, tree surgeon debris, and clean dry lumber such as pallets." At the hearing, DEP produced an undated draft permit for the Model 40 ACI. The only change from the August 31, 1995, permit is that the draft permit requires Applicant to remove the existing ACI from the facility. Applicant has been operating a McPherson Model 30 ACI at the same location as that proposed for the Model 40 ACI. Formerly zoned heavy industrial, the location, which is 16351 Old Highway 41 in Ft. Myers, is presently zoned for the operation of an ACI, and the facility is surrounded by industrial uses. Applicant has been operating the Model 30 ACI at the present location since December 1992 under a permit dated February 15, 1993. The permit for the Model 30 ACI, which expires February 15, 1998, contains similar Specific Conditions as those under contained in the new permit, except that the old permit does not limit the amount of material that can be stored onsite. The Model 30 ACI is different from the Model 40 ACI. The Model 30 ACI is an older, smaller model with a capacity of 20 tons per hour. Lacking the three-walled upper chamber, the Model 30 ACI cannot maintain the integrity of the air curtain as well as can the Model 40 ACI. The Model 30 ACI has a larger- meshed screen than the Model 40 ACI, so larger particulates and ash can escape the incinerator. Compared to the Model 40 ACI, the Model 30 ACI is manufactured with less durable components, which are more vulnerable to damage from the hot steam produced from the combustion of exceptionally moist vegetation, such as Brazilian Pepper and melaleuca. Also, Applicant's Model 30 ACI either lacks a below-fire blower or its below-fire blower is broken, so as to impede effective combustion. Applicant's Model 30 ACI is in dilapidated condition, leaving it both unsafe and ineffective. The operating history of Applicant's Model 30 ACI has been uneven. Applicant's Model 30 ACI has never failed a Class III inspection, which is a 90- minute inspection conducted annually. Applicant's Model 30 ACI has failed one of five Class II inspections, which are 30-minute visible-emissions inspections. Applicant's Model 30 ACI has passed most of about 17 Class I inspections, but its failures have resulted in two consent orders, including one in which DEP fined Applicant $2000. On April 4, 1994, a defective wall in Applicant's Model 30 ACI allowed hot embers to escape and ignite a large fire on the grounds of the facility. The fire required many hours of firefighting before it could be extinguished. However, Applicant has since adopted a firefighting plan and installed sprinklers on the grounds. The proposed limitation of onsite vegetative debris would further reduce the risk of fires escaping from the Model 40 ACI. DEP produced some, but not all, field investigation reports for Applicant's facility. On June 9, 1994, DEP inspectors visited the site after receiving complaints of heavy smoke in the area. After an investigation, they prohibited Applicant from accepting new material for three weeks, presumably so Applicant would be under less pressure to burn vegetative material that had not dried sufficiently to burn efficiently and without visible emissions. On July 5, 1994, a DEP inspector visited the site after receiving a complaint and found brown and white smoke of 15-30 percent opacity emanating from the Model 30 ACI, largely due to excessive moisture in the vegetative material being added to the incinerator. A week later, at mid-day, a DEP inspector visited the site and saw white smoke of 30-50 percent opacity for one minute, followed eventually by five percent opacity. On August 24, 1994, a DEP inspector noticed brown smoke emanating from the Model 30 ACI at about 4:00 pm. The opacity was 10-25 percent. Applicant had allowed a log to protrude through the air curtain, which allowed smoke to escape from the incinerator. On November 17, 1994, two DEP inspectors visited the site and noted brown smoke emanating from the Model 30 ACI with 10-25 percent opacity. Applicant's representative explained that the walls of the Model 30 ACI were damaged and allowed the smoke to escape from the incinerator. The representative assured the DEP inspectors that a replacement wall was onsite and maintenance was soon to be undertaken. DEP conducted T-screen modeling to determine whether particulate emissions from the Model 40 ACI would be below the ambient air quality standards within one-half mile of the facility. DEP determined that, under the worst-case situation, proper operation of the Model 40 ACI would not have an adverse impact within one-half mile of the facility. Applicant has not, at all times, operated the Model 30 ACI in a safe and effective manner, especially with respect to the moisture content of loads added to the ACI. Hot steam emerging from excessively moist loads has damaged the walls of the Model 30 ACI and shortened its useful life. The damage to the walls has in turn impaired the ability of the Model 30 ACI to burn safely and efficiently the vegetative material added to the unit, leading to one serious fire and many violations of DEP's standards for visible emissions. Petitioner presented evidence of visible smoke and smoky odors entering her home and the homes of other residents living in the vicinity of Applicant's facility. Some of these incidents are attributable to Applicant, and some are not. The Model 40 ACI would improve the conditions of which Petitioner complains. The new ACI would be a marked improvement over the old ACI, as long as Applicant properly operates the Model 40 ACI and DEP routinely monitors Applicant's operations and enforces the permit conditions and other provisions of law. Under the circumstances, including Applicant's recent operating history, Applicant has provided the necessary reasonable assurance for the issuance of a new permit authorizing the construction and operation of the Model 40 ACI described in the August 31, 1995, proposed permit, as modified by the undated draft permit, together with the proposed general and special conditions. However, the finding of reasonable assurance is predicated on a new provision in the proposed permit limiting the term of the new permit to the termination date of the original permit for the Model 30 ACI, which is February 15, 1998. Given Applicant's recent operating history, Applicant has not provided the necessary reasonable assurance for an operating permit with a longer term than the term remaining under the old permit. If Applicant demonstrates that it can safely and effectively operate the Model 40 ACI between now and February 15, 1998, it can obtain a five-year permit at that time.

Recommendation It is RECOMMENDED that the Department of Environmental Protection enter a final order issuing a permit to Construction Burning, Inc. to replace the existing McPherson Model 30 ACI with a Model 40 ACI, pursuant to the Intent to Issue dated August 31, 1995, as modified by the undated draft permit requiring the elimination of the Model 30 ACI, and operate the Model 40 ACI through February 15, 1998, in accordance with all permit conditions and other provisions of law. ENTERED on May 22, 1996, in Tallahassee, Florida. ROBERT E. MEALE Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings on May 22, 1996. APPENDIX Rulings on Petitioner's Proposed Findings 1: rejected as not finding of fact. 2: rejected as unsupported by the appropriate weight of the evidence. 3-5: rejected as recitation of evidence. 6: rejected as recitation of evidence. However, the failure of the DEP witness to bring with him the file of Applicant is inexplicable. 7: adopted or adopted in substance. 8 (first two sentences): rejected as irrelevant. 8 (remainder): adopted or adopted in substance, to the extent of a limit on the term of the new permit. 9: rejected as not finding of fact. 10: rejected as recitation of evidence. 11: rejected as unsupported by the appropriate weight of the evidence and relevance. Rulings on Applicant's Proposed Findings 1-3: adopted or adopted in substance. 4: rejected as not finding of fact. 5: adopted or adopted in substance except as to the date on which operation started. Applicant's president testified that Applicant began operations in 1992. 6-7: adopted or adopted in substance. 8 (first sentence): rejected as unsupported by the appropriate weight of the evidence. 8 (remainder): adopted or adopted in substance, except for finding as to when Applicant learned of damage to the Model 30 ACI. 9: rejected as subordinate. 10-14: adopted or adopted in substance. 15-16: rejected as recitation of evidence. 17: rejected as unsupported by the appropriate weight of the evidence. 18: rejected as subordinate. 19: rejected as recitation of evidence. 20: rejected as unsupported by the appropriate weight of the evidence. However, this remedy is available by law to DEP, regardless of the provisions of the permit. 21-22: adopted or adopted in substance. 23: rejected as recitation of evidence. 24-25 (first sentence): adopted or adopted in substance. 25 (remainder): rejected as recitation of evidence. 26: adopted or adopted in substance. 27-30: rejected as recitation of evidence. 31: rejected as legal argument. Rulings on DEP's Proposed Findings 1-24: adopted or adopted in substance. 25: rejected as recitation of evidence. 26-27: adopted or adopted in substance. 28: rejected as unsupported by the appropriate weight of the evidence, unless the term of the new permit is limited to the remaining term of the old permit. 29: rejected as legal argument. 30-59: rejected as subordinate, except to the extent incorporated in the recommended order. COPIES FURNISHED: Virginia B. Wetherell, Secretary Department of Environmental Protection Douglas Building 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 Kenneth Plante, General Counsel Department of Environmental Protection Douglas Building 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 Patricia d'Hondt 6288 Briarwood Terrace Ft. Myers, Florida 33912 Connie D. Harvey Akerman, Senterfitt & Eidson, P.A. 100 South Ashley Street, Suite 1500 Tampa, Florida 33602-5311 Stephen K. Tilbrook Assistant General Counsel Department of Environmental Protection 3900 Commonwealth Boulevard Tallahassee, Florida 32399-2400

Florida Laws (2) 120.57403.087 Florida Administrative Code (2) 62-296.40162-4.070
# 6
MARTHA SCHOENACHER vs S.M.G., INC. AND DEPARTMENT OF ENVIRONMENTAL PROTECTION, 02-003834 (2002)
Division of Administrative Hearings, Florida Filed:Crystal River, Florida Sep. 19, 2002 Number: 02-003834 Latest Update: Jun. 03, 2003

The Issue The issue presented is whether Respondent, S.M.G., Inc. (SMG), has provided reasonable assurance that its existing air curtain incinerator will be operated in accordance with applicable statutory and rule provisions.

Findings Of Fact The Parties The Department is the state agency responsible for receiving applications for, and the issuance of, permits for the construction and operation of air curtain incinerators in the State of Florida. SMG is a contracting company, with residential, trucking, agricultural, and commercial driver's license divisions. SMG is the applicant for a permit to operate an air curtain incinerator. Petitioners reside in Citrus County, Florida, in the vicinity of the constructed and operational air curtain incinerator. For the most part, Petitioners reside northeast, east, or southeast of the site. The Petitioners demonstrated their standing in this proceeding. SMG's Construction Permit On May 23, 2001, SMG submitted an application for an air construction permit to the Department's Southwest District Office. The application sought authorization to construct an air curtain incinerator "[o]n the east or west side of 6844 N. Citrus Avenue, Crystal River," Citrus County, Florida. 1 The general purpose of pursuing this permit was to burn wood waste. On July 9, 2001, the Department issued SMG a Notice of Intent to Issue the Proposed Air Construction Permit (Permit No. 0170360-001-AC). A copy of the Notice of Intent was published in the Citrus Times in Citrus County on July 19, 2001. On August 6, 2001, the Department issued SMG an air construction permit for the proposed air curtain incinerator. The construction permit authorized the construction of a McPherson Systems, Inc. - Model M30E air curtain destructor (incinerator) with under fire air at a natural non-Title V facility. Pursuant to the terms of the construction permit, in November 2001, SMG constructed an air curtain incinerator on approximately 500 acres of land on the east side of State Route 495 north of Crystal River in Citrus County, Florida, on property owned by the Gerrits family. See Endnote 1. Pursuant to the construction permit, SMG installed a McPherson Systems, Inc. - Model M30E air curtain incinerator with under fire air, a refractory lined burning pit, three upper chamber refractory lined walls (ten feet high), and a stainless steel spark arrester screen. The manifold blower and under fire air fans are powered by an electric engine. The manufacture designs and specifications for the McPherson model were submitted with the application for the air construction permit and admitted in evidence. Construction of a portable air curtain incinerator with a blower/fan system powered by a diesel-fired engine was contemplated by the air construction permit. Although cheaper, SMG instead chose to install the McPherson model that would produce the cleanest burn, i.e., one with fewer emissions, that was operated by electricity. The McPherson model used by SMG is recognized as an efficient, reliable model of air curtain incinerator. The diesel-fired blower/fan/engine system contemplated by the construction permit is considered exempt from permitting. An engine operated by electricity has no emissions and therefore does not require an air permit from the Department. The Department could not require a permit for the blower/fan system alone. The operating permit supercedes the construction permit, except as amended. Testing after Construction of the Incinerator On November 23, 2001, SMG began operating the air curtain incinerator. Pursuant to Special Condition 22 of the air construction permit, an initial visible emissions (VE) (opacity test) compliance test was performed on November 23, 2001, by Bernard A. Ball, Jr., an environmental engineer with Southern Environmental Services, Inc. The results of the initial VE compliance test were within the opacity limits contained in the construction permit. Specific Condition 19 of the construction permit requires SMG to maintain daily operating logs of the air curtain incinerator's daily operations. In order to obtain an air operating permit, a permit applicant is required to demonstrate compliance with the Department's rules and with the conditions of the construction permit. The Department requires an applicant for an operating permit to submit copies of recent daily operating records for the facility and copies of the emissions test required by the construction permit. These operating records are submitted in order for the Department to determine whether the applicant is complying with the applicable emissions standards and that the applicant is, in fact, maintaining the required operating logs as required by the construction permit. In order for SMG to obtain the operating permit for the incinerator, Specific Condition 28 of the construction permit required SMG to file an application for an air operating permit with the Department within 45 days of testing and required the application to include a copy of the VE test report and copies of at least two recent weeks of daily operating logs. On March 14, 2002, a second VE test was conducted by Mr. Ball, which also indicated that emissions were within the construction permit's opacity limits. On April 1, 2002, SMG submitted its application for the air operation permit to the Department. The application was signed by Sean Gerrits, and contained copies of the VE test reports for the November 2001 and March 2002 tests, as well as three and one-half months of daily operating logs, certificates showing that the incinerator operators were trained, and photographs of the incinerator in operation. SMG submitted the documentation required under the construction permit. On April 19, 2002, Robert E. Soich, Jr., air compliance inspector for the Department's Southwest District Office, performed an unannounced inspection and conducted a VE test in response to a complaint by Mr. Leonard Kaplan (a Petitioner), complaining of odors present. Excessive visible emissions were observed by Mr. Soich on April 19, 2002. The incinerator did not pass the VE test because of the improper alignment of the blade angle on the manifold of the blower system and because of green leaves and inadequate drying of the materials to be burned in the incinerator. Mr. Soich also observed, in part, that "materials need to be prepared better for burning." As a result of this unannounced inspection and the negative VE test, the Department requested SMG to provide an explanation of the VE test results and of the type of changes SMG planned to implement to correct the problem. On learning of the problem, SMG shut down the incinerator and called a McPherson mechanical contractor to come out and adjust the blade angle. Southern Environmental Services conducted another VE test to ensure the problem had been corrected. On April 22, 2002, a VE test was conducted by Southern Environmental Services on-site which showed compliance with the construction permit. On April 30, 2002, SMG advised the Department that adjustments were made to the baffles to correct the angles. SMG provided the Department with the April 22, 2002, VE test results. SMG also implemented better operational procedures. On May 30, 2002, with Mr. Soich present, SMG, by Byron E. Nelson, performed another VE test. The test results showed compliance with the opacity limits in the construction permit and the results were submitted to the Department.2 Mr. Nelson, an environmental engineer with Southern Environmental Sciences, testified that he has been involved in preparing approximately two dozen applications for air curtain incinerators and has conducted probably "thousands" of visible emissions tests. Mr. Nelson is certified by the State of Florida to conduct VE tests. He has seen "two or three dozen" air curtain incinerators in operation and has conducted VE tests on about 20 of them. Based on his experience, Mr. Nelson testified that SMG employed the same practices and controls to control odor, smoke, and fugitive emissions as other such incinerators he is familiar with. He testified that the amount of smoke and odors from the SMG incinerator is similar to that emitted from other air curtain incinerators, and that the fugitive emissions from the SMG incinerator were probably less than others he is familiar with. Based on his experience, Mr. Nelson opined that SMG has taken reasonable measures to minimize odor, smoke and dust/particulates from the operation of the incinerator. Mr. Nelson likewise opined that the SMG incinerator is well run, perhaps better run than other incinerators. (Mr. Nelson had been on the SMG site twice when the incinerator was operating and burning wood products.) Based on his experience, Mr. Nelson opined that SMG meets the requirements necessary to obtain an air operating permit from the Department and has demonstrated that it has complied with the conditions of its construction permit. Mr. Soich is the air compliance inspector for the Department's Southwest District Office. He testified that he has inspected the operations of other air curtain incinerators over the last 15 years. Mr. Soich testified that SMG is one of the "better operators" of air curtain incinerators he is familiar with. (Mr. Soich visited the SMG site approximately nine times from March 13, 2002, to October 15, 2002.) Mr. McDonald is the Air Permitting Engineer for the Southwest District Office of the Department. He is responsible for reviewing all applications for air curtain incinerators in the Southwest District and has reviewed applications for between 25 and 30 incinerators. Mr. McDonald reviewed the SMG permit applications. Based on the latest VE test results, copies of the records attached to the operating permit application, and his experience, Mr. McDonald, for the Department, determined that SMG had demonstrated compliance with the conditions of the construction permit and recommended issuance of the operating permit for the incinerator. He maintained the same position at hearing. SMG provided assurance that the DeRosa Fire Department would respond in the event of a fire at the incinerator. On June 19, 2002, the Department issued the proposed air operating permit. Operation of the Air Curtain Incinerator Emissions from the incinerator are controlled by a curtain of forced air at a very high static pressure over and around the burning pit. The air curtain traps smoke and small particles and recirculates them to enhance combustion and reduce smoke. The underfire air introduces air underneath the air curtain to ensure complete combustion and minimize opacity at start-up. The refractory-tiled ceramic concrete burn pit provides a safe combustion chamber, and the refractory panels keep excess heat from escaping. The upper chamber refractory panels, which surround three sides of the burn pit, allow more retention time in the burner to better control opacity and sparks. The stainless screen spark arrestor also controls sparks and debris from leaving the burner. The operating permit application proposed the use of an air curtain blower along with a manifold to provide forced air to the burning pit. According to the manufacturer specifications, the blower can force air into the pit at velocities of between 100 and 120 mph. This ensures that the flames in the burn pit receive enough oxygen to combust completely. The air circulates inside the burn pit to ensure a complete burn, which reduces smoke and odor. The combustion temperature for the burning pit ranges from approximately 1,800 to 2,500 degrees Fahrenheit. The operating permit allows a maximum charging rate of ten tons per hour on a daily average basis and 31,200 tons per any consecutive 12 month period. The incinerator has been operating below the maximum charging rate. The operating permit limits the hours of operation (charging) to 3,120 hours per year, i.e., ten hours/day, six days/week, 52 weeks/year. According to various SMG operating and maintenance logs, the incinerator has been operated below this limit. The operating permit, in accordance with Rule 62- 296.401(7), Florida Administrative Code, allows the burning of only wood waste, yard waste, and clean lumber, and prohibits the burning/incineration of materials such as sawdust, paper, trash, tires, garbage, rubber material, plastics, liquid wastes, Bunker C residual oil, roofing materials, tar, asphalt, railroad cross ties, or other creosoted lumber, chemically treated or painted wood, and other similar materials. Biological waste shall not be burned in the incinerator. During its operation, the incinerator only burned wood and yard waste, and Mr. Gerrits testified that the waste materials are inspected before being burned in order to ensure that no prohibited materials are burned. If any non-authorized materials are observed, they are removed before the waste is burned. See Finding of Fact 24. The operating permit allows visible emissions during start-up periods (not to exceed the first 30 minutes of operation) of an opacity up to 35 percent, averaged over a six- minute period, as provided for in Rule 62-296.401(7)(a)-(b), Florida Administrative Code. The McPherson model is designed to meet the requirements of the above-referenced rule, and the VE tests run during start-up periods (except one performed by Mr. Soich on April 19, 2002) demonstrated compliance with this requirement. Id. The operating permit limits visible emissions outside of start-up periods (the first 30 minutes of daily operation) to no more that five percent opacity, with visible emissions of up to ten percent opacity allowed up to three minutes in any one hour as provided for in Rule 62-296.401(7)(a), Florida Administrative Code, and 40 Code of Federal Regulations Part 60, Subpart CCCC, adopted and incorporated by reference in Rule 62- 204.800(8)(b)74, Florida Administrative Code. (Rule 62- 296.401(7)(a) permits up to 20 percent opacity. The ten percent rate is required by the new federal standard. See SMG Exhibit 13, page 3 of 9.) The opacity limits in the operating permit are more stringent than those contained in the construction permit, which allows visible emissions of up to 20 percent opacity up to three minutes in any one-hour period. (By definition, a "visible emission" is "[a]n emission greater than 5 percent opacity or 1/4 Ringelmann measured by standard methods." Rule 62-296.200(278), Florida Administrative Code.) The VE test results submitted by SMG demonstrate compliance with the opacity limits in the operating permit and with the opacity limits in the construction permit for the days tested. See Findings of Fact 18, 22, 27, and 29. The operating permit requires that the incinerator must be attended at all times while materials are being burned and that public access to the incinerator must be restricted. A certified operator is in attendance whenever the incinerator is operated, i.e., when something is burning in the incinerator. A fence has been constructed around the property. The operating permit prohibits starting the incinerator before sunrise and requires that all charging of the incinerator be completely stopped before sunset as required by Rule 62- 296.401(7)(h), Florida Administrative Code. Mr. Gerrits testified that the incinerator is never started before sunrise and is typically started after 8:00 a.m. Mr. Gerrits testified that the incinerator is never charged after sunset and that charging typically stops at 4:00 or 5:00 p.m. See Endnote 4. These practices are consistent with the Operations and Maintenance Guide for the incinerator. The operating permit limits the height of the ash in the burning pit to one-third of the depth of the pit or to a point where the ash begins to impede combustion, whichever occurs first as provided in Rule 62-296.401(7)(m), Florida Administrative Code. The one-third depth line is marked on the outside of the incinerator. Mr. Gerrits testified that ash is regularly removed from the burning pit every third day to keep the ash level low, which helps ensure better combustion and reduces smoke. The operating permit provides that material shall not be loaded into the incinerator in such a way that it will protrude above the air curtain. Testimony established that the SMG incinerator is properly loaded. The operating permit requires that all operators of the incinerator be trained in the proper operation and maintenance of the incinerator and that an operations and maintenance guide be maintained at the facility at all times. All of the operators of the SMG incinerator have taken a four-hour training course to learn how to operate the incinerator in accordance with Department regulations and good operating practices, and certificates attesting to that training were submitted with the application for the operating permit. An Operations and Maintenance Guide was submitted with the application for the construction permit. The operating permit requires the maintenance of a daily operating log. The daily operating log must be maintained at the facility for at least five years and must be available for inspection by the Department upon request. SMG currently maintains a daily operating log that meets the requirements of the construction permit. SMG submits those daily logs to the Department on a monthly basis after the Department requested that SMG do so. The log includes a date and site location, daily operating hours, total charges, total material charged in tons, average hourly charging rate, any maintenance performed, fuel usage in gallons, and the operator's signature. The logs of record contain this information and have been initialed by SMG's operator for each day when the incinerator has been operated. SMG operators responsible for preparing the logs have no incentive to indicate the incinerator is not operating on days or during hours when it is running, as a deliberate misstatement on the operating logs could result in enforcement action by the Department and being fired by SMG. The operating permit requires that all reasonable precautions be undertaken to prevent and control the generation of unconfined emissions of particulate matter in accordance with Rule 62-296.320(4)(c), Florida Administrative Code. SMG takes reasonable precautions to prevent and control the generation of unconfined emissions of particulate matter, including paving the road that leads to the incinerator to reduce dust, wetting the ashes removed from the burn pit, wetting the ash piles and ramp that addresses the incinerator, approaching the incinerator at a slow rate, and placing a charge into the incinerator slowly and carefully. SMG voluntarily added a sprinkler system on all four corners of the burning pit that was not contemplated by the construction permit. The Department witness Mr. McDonald testified that this provided an additional method to control unconfined emissions. Although the construction permit and proposed permit do not contain conditions prohibiting the burning of green wood or wet wood waste, SMG takes precautions at the request of Mr. Soich to ensure that the wood is properly dried before being burned. See Finding of Fact 24. This helps to reduce smoke and emissions from the incinerator. (Moisture is the primary factor that inhibits burning and causes smoke and potentially odor.) As part of the routine practice in handling the wood waste before it is burned, trucks bringing wood waste to the incinerator are instructed to dump it into a pile. SMG operators then use a loader to flatten out the pile and remove dirt, prohibited materials, and harvestable pieces of wood. Harvestable pieces of wood and dirt are removed to separate staging areas. The remaining wood waste is separated into long windrows, with the oldest row closest to the incinerator. The windrows are flipped or rolled over in the direction of the incinerator, allowing the waste to dry. The waste in the row closest to the incinerator is burned, and subsequent windrows are rolled over in its place. Ash is generally removed from the burn pit every third day; it is wetted on removal to reduce dust, and the ash piles adjacent to the incinerator are also kept wetted by the sprinkler system. The ash is eventually mixed with the dirt in a composter for use as Class-A unrestricted compost. The SMG operator in charge on a particular day decides whether the incinerator will operate that day, in accordance with standard operational practices. The operator checks the weather forecast. If it is raining or if there are high winds (over 20 miles per hour), the incinerator will not be operated that day, and SMG typically waits four days after a rain to begin operating the incinerator again. These procedures are not contained in any permit conditions. The purpose of not operating during or immediately after a rain and taking steps to ensure the wood is dry is to reduce smoke; wet wood smokes more. Rainy weather can also affect odor. The purpose of not operating during windy conditions is to reduce the possibility of fire on SMG's property, but wind can also affect odor and visible emissions. On days when the incinerator is not operating, SMG conducts yard maintenance, maintains the waste windrows, and runs the composter. The composter is a source of noise and is located adjacent to the incinerator and is run when the incinerator is shut down. To ensure that the visible emission limitations are not exceeded and objectionable odors3 not generated, the operating permit requires that the incinerator's fan shall continue to operate after the last charge of the day until all combustion (presence of any flame or smoke) has ceased. Generally, the incinerator keeps burning an hour to an hour and one-half. Mr. Gerrits testified that the fan is kept running until the flames and smoke die out and that a certified operator is present until the fan is switched off. The operating permit requires that the testing of visible emissions must be conducted within 90-100 percent of the maximum allowable charging rate of 10 tons/hour and shall be conducted when the highest emissions can reasonable be expected to occur.4 Testing of the SMG incinerator was conducted at within 90-100 percent of the maximum allowable charging rate of 10 tons per hour, and the May 30, 2002, test results indicated that the incinerator was operating within the opacity limits of its permit even when operating at close to maximum capacity. Evidence established that the May 30, 2002, VE test complied with the specific conditions of both the construction and operating permit. See Finding of Fact 29. The test method for visible emissions required by both the construction permit and the operating permit is EPA Method 9, adopted and incorporated by reference at Rule 62- 204.800(8)(b)74, Florida Administrative Code. (Method 22 is not required pursuant to Department rules for compliance testing of an air curtain incinerator.) Testimony established that Method 9 was the method used for the VE tests conducted on the SMG incinerator. As required by both the construction and operating permits, the incinerator is located in excess of 300 feet from any pre-existing occupied building located off site as required by Rule 62-296.401(7)(j), Florida Administrative Code. The closest residences, that of Mr. Gerrits' father and his tenant, are approximately 1,500 feet away. Petitioners' Challenge For the most part, Petitioners reside northeast, east, or southeast of the incinerator. One Petitioner resides approximately three-tenths of a mile southeast of the incinerator; others reside at greater distances, up to approximately a mile and one-half away from the incinerator. Each of the Petitioners who testified have resided in this area for many years, pre-dating the operation of the incinerator. The Petitioners who testified were credible and well- intentioned. Each of these Petitioners maintained daily logs covering several months when the incinerator was authorized to operate. Some kept logs for several months, while others kept logs for several days. They noted their observations and perceptions in the logs. Admittedly, Petitioners are not experts in the detection of odors or noise levels. Nevertheless, they recorded their own experiences as to what they saw, heard, and/or smelled, believing that the odors and noise came from the incinerator. Some recorded that they smelled the strong odor of smoke, an "acrid smell," a "pungent smell," for example; "it makes your eyes burn and throat burn" said another during the hearing. One witness described the experience as being a prisoner in his house. Another does not go outside when the smell is bad. Generally, the level of odor varied with the weather conditions, i.e., a stronger odor was noticed on foggy and wet days or nights and when the wind blows from the west, which Petitioners contend is the prevailing wind. Some witnesses only smelled the odor during the night and not during the day, and not all of the time. Some complained about the odor and noise, or one and not the other. Some believed the noise coming from the incinerator was a major problem. At least two witnesses who live approximately three-tenths of a mile and 3,500 feet, respectively, from the incinerator site, described the noise as being like a jet airplane. One witness shuts her windows to keep out the noise. (SMG also operates a "wood chipper" or "composter" on site which is loud. Mr. Gerrits stated that he did not think the sound was the same as made by the incinerator fan. He also stated that "[i]t doesn't exceed the noise decibels. It doesn't exceed background noise levels at [their] property line.") Petitioners documented their concerns which are described, in part, above, and also documented their complaints to the Department and local government. It appears that each of the logs prepared by the Petitioners (who kept logs) were given to Petitioner Martha Futscher, who summarized and compiled a hand-written master list of the complaints. Then, Mr. Harvey inputted this data on the master list (spread sheet) of complaints, which appears as Petitioners' Exhibit F1. The master list contains recorded observations from May 2002 through January 2003. The master list contains a representation of when the incinerator started and stopped for various days and when it was operational or not, and this information was derived, according to Mr. Harvey, from the logs maintained by SMG. The master list also provides tons per hour of waste burned on particular days, the observer's initials, and the approximate distance each observer lived from the incinerator, and the comments, with time of observation or perception noted. There are discrepancies between the master list and the actual logs maintained by SMG as to when the incinerator was operational. There also appears to be several differences in observations between the Petitioners' master list and other evidence which indicates when Mr. Soich inspected the incinerator and determined that the incinerator was operating satisfactorily. Compare Petitioners' Exhibit 2 with Petitioners' Exhibit F1. For example, the master list records an observation from May 30, 2002, when the incinerator was operating, when there was noise and smoke noted at 8:00 a.m., and flames at the incinerator and odor at 5:30 p.m. Conversely, Mr. Soich was on-site on May 30, 2002, and observed the scheduled VE test. No problems were noted with the operation on this date by Mr. Soich. Mr. Soich also noted that "wood waste was properly dry and free of debris." The VE test on May 30, 2002, was performed from 10:29 a.m. to 11:59 a.m. and showed compliance with opacity limits. The master list indicates that black smoke was observed (no time given) on May 7, 2002, when the incinerator was operational, yet Mr. Soich inspected the incinerator on that day and there is a notation in the record that the incinerator was operating between 0-5 percent visible emissions. (Mr. Soich opined that it should be very rare to smell objectionable odors if the visible emissions run at a 5 percent level.) For October 15, 2002, there is a notation in the master list that a Petitioner commented that the incinerator was running during the day ("AM/PM Running") and that there was a strong smell at approximately 7:05 p.m. A strong smell at the person's house was also noted at approximately 9:30 p.m. on that day. However, Mr. Soich performed an annual inspection of the incinerator on October 15, 2002, and there is a notation on the master list, Petitioners' Exhibit 2, that the incinerator was not operating due to recent rain. As one Petitioner testified, her point was that the inspectors are not there when she hears the noise, sees smoke, and smells the odor. Mr. Soich confirmed that he does not inspect the facility in the evening. Petitioners also provided, as evidence in support of their position, six videotapes of the incinerator for September 19, October 3, October 23, November 25 (2 tapes), 2002, and January 10, 2003. (Mr. Harvey took the videotapes from the same location, across the street and west of the incinerator.) Each tape, except for September 19, 2002, showed smoke emanating from the operational incinerator. On September 19, 2002, the incinerator was not running according to the SMG log. There was a malfunction which was reported to the Department. The SMG log indicates that the pit was cleaned out, site cleared and rows moved. There is also a notation in the SMG log for this date that there was a power failure/malfunction at the incinerator at 9:00 a.m., and that the power was out. According to Mr. Gerrits, the malfunction caused smoke. (One Petitioner observed smoke from ashes on September 19, 2002.) While the Petitioners proved that there was smoke emanating from the operation of the incinerator on the days which were videotaped, with the exception of September 19, 2002, this did not necessarily prove that the emissions exceeded the requirements of the Department rules or that there was an objectionable odor emanating therefrom. Mr. Stoich observed the videotapes played during the hearing. In particular, with respect to the January 10, 2003, videotape, Petitioners' Exhibit 12, Mr. Stoich stated that a level of opacity cannot be determined from photographs and videotapes. He also noted that there was "a lot of white smoke," an atypical situation according to him, emanating from the incinerator and that he, as a compliance inspector, would have investigated further and performed an inspection, including a VE test, to determine if there was a violation, had he seen this smoke. However, he stated that without actually seeing the operation, he could not determine whether a violation had occurred. There was persuasive evidence that compliance with the opacity limits of a permit can only be determined through VE tests conducted using the Department-approved EPA Method 9. The VE test takes into account wind, the angle of the plume, the position of the sun, and other factors, and must use appropriate averaging to ensure that the test is valid. A smoke plume can look quite dense at the wrong angle or if the light is reflecting off the plume in a certain way, when in fact it is in compliance with Department rules. The VE tests for the incinerator have, with one exception, see Finding of Fact 24, demonstrated compliance with the opacity limits in the construction permit. As noted herein, upon receipt of notice that one VE test failed, SMG implemented corrective actions, and two VE tests conducted after the time showed the incinerator was operating in compliance with the opacity limits of the permit. See Findings of Fact 27 and 29. The Department relies on its compliance inspectors, such as Mr. Soich, to make a determination of whether an air emission source is causing an objectionable odor. There does not appear to be an approved Department method for measuring odors from incinerators. (Mr. Nelson stated that odors are difficult to test and that "odor is done collecting samples." No samples were taken or analyzed.) On the other hand, Mr. Soich testified that, based on his years of experience, he has developed certain methods for determining whether a facility is emitting an objectionable odor under the rules. If he receives an odor complaint, which he has in this case, he goes to the site and checks the prevailing winds. He also travels around the facility to determine the source of the odor. An odor can be deemed objectionable if it is very strong and overpowering, such that he cannot stay on- site and breathe in the odors. An odor can also be deemed objectionable if, after being on-site for some extended period of time, he begins to develop symptoms such as runny eyes, a scratchy throat, or a headache as a result of the smell. Finally, he may bring along another Department employee to determine whether the other individual finds the odor objectionable. Enforcement actions can be taken if objectionable odors are detected. Mr. Soich testified that he has inspected the incinerator at least nine times in the past year and never detected an objectionable odor. On some of the visits, the incinerator was not operational. On rebuttal, several residents of the area testified that they had not experienced objectionable odors from the incinerator. David Stevens, the Chief of the DeRosa County Fire Department, testified that an open land-clearing burn emits black smoke, more so than he observed from the incinerator. This fire department only had to respond to false alarms at the incinerator. Mr. Stevens personally inspected the operation of the incinerator and thought it was a very safe operation. Randy Morgan, a wildlife firefighter and certified burner with the Division of Forestry with over 16 years of experience in fire control, testified that approximately 50,000 acres of the state land burns occurred in Citrus County last year. These land burns can be a significant source of smoke and odor. In addition, approximately 50 open burn authorizations are issued each day. He also testified that controlled burns of approximately 15 fires of approximately 50 to 2,000 acres a day occurred in 2002 in proximity of the SMG incinerator which is a source of smoke and odor. The state also conducts open burns of some kind approximately ten months out of the year. Other witnesses testified that, given the rural nature of the community, open burning of trash, wood, and leaves occurs on a regular basis. Ultimate Findings of Fact Credible evidence established that SMG meets or exceeds the requirements in the construction permit to reduce smoke, dust, and odor, and these requirements are carried over to the operating permit. Credible evidence established that SMG employs the same, if not better, practices and permit conditions to control smoke, dust, and odor as other air curtain incinerators in the state. Credible evidence established that the SMG incinerator is operated in accordance with its construction permit. Credible evidence established that the SMG incinerator can be expected to be operated in accordance with its operating permit. Credible evidence established that the SMG incinerator is operated in accordance with Department rules. In light of the foregoing, SMG has demonstrated reasonable assurance that its air curtain incinerator has been operated in compliance with the construction permit and that the incinerator can continue to be operated in accordance with the conditions of the operating permit.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Environmental Protection enter a final order granting SMG's application and issuing Permit No. 0170360-002-AO, as amended, and subject to all conditions, including but not limited to the Specific Conditions set forth in the Department's Notice of Intent to Issue, for the operation of an air curtain incinerator in Citrus County, Florida. It is further recommended that Petitioners' challenge to the amendment to the operating permit be dismissed. See Preliminary Statement. DONE AND ENTERED this 21st day of April, 2003, in Tallahassee, Leon County, Florida.5 CHARLES A. STAMPELOS Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 21st day of April, 2003.

Florida Laws (2) 120.569120.57
# 7
RYAN SALES AND SERVICES, INC. vs. SAINT LUCIE INCINERATION AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 87-000061 (1987)
Division of Administrative Hearings, Florida Number: 87-000061 Latest Update: Apr. 23, 1987

Findings Of Fact On September 22, 1986, Saint Lucie Incineration (Applicant), filed an application with the Department of Environmental Regulation (Department) for a permit to construct an air curtain incinerator, an air pollution source, in Saint Lucie County, Florida. The permit would have allowed the Applicant to construct, after-the-fact, the subject incinerator within an existing landfill owned and operated by Saint Lucie County. On November 5, 1986, the Department gave notice of its intent to issue the requested permit, and Petitioner, Ryan Sales and Services, Inc. (Ryan), filed a timely request for formal administrative review. The Air Curtain Incinerator The principles underlying the design and function of air curtain incinerators are neither new nor complex; however, their permitted use in the State of Florida is a recent development. The basic components of this type incinerator are a "pit" in which the materials are confined, a blower to deliver air under the materials to increase combustion efficiency, and a plenum from which a high-speed layer of air (an air curtain) is directed at a fixed downward angle across the pit. The air curtain serves as an air pollution control device by substantially limiting the emissions that can escape from the pit and by increasing combustion efficiency. 1/ The integrity of these components is critical if the unit is to function in compliance with the Department's standards. In this case, the Applicant has applied for a permit to construct a 40' air curtain incinerator manufactured by Intervenor, Rabun and Company, Inc. (Rabun). The construction of this unit was completed, with the exception of the installation of its electric supply and a steel trough to be used as a slide plate for materials entering the "pit", before the subject application was submitted to the Department. Consequently, while no tests have been run on the unit, its physical presence permits an objective evaluation of its capabilities. Structural Integrity Of The Rabun Unit Pit The Rabun "pit is erected above ground, and rests on a concrete foundation. Its sides are manufactured of steel refractory panels, 4' wide and 6' high, which are bolted to a steel framework. Its overall dimensions are 40' long, 8' wide at the rear, 8'3 wide at the front, and l2' high from the base of the foundation. The steel framework, including the columns and beams, should provide structural stiffness to the air curtain incinerator's "pit". A lack of structural stiffness will result in movement of the walls during operation, and a resulting loss of an effective air curtain. The steel frame at the front of the Rabun pit, where the doors are located, is not designed or constructed in accordance with good engineering practices. The horizontal beam at the top of the unit, which connects to the vertical beams on both sides of the doors, is secured to each vertical beam by only two bolts. When debris strikes the sides of the "pit", these bolts will have to absorb 2.8 times the load of the bolts holding the vertical beams to the foundation. This unequal load will translate into a twisting of the vertical beams, and a loss of air curtain integrity. The doors at the front of the Rabun pit, which are opened to remove debris from the unit, also do not conform with good engineering practices. The locking assembly of the unit is subject to failure from the impact of materials which may reasonably be expected to be loaded into the unit. The consequences of such failure during operation of the unit would be the emission of pollutants. The design spacifications for the Rabun unit call for the refractory panels to be 5" thick. According to Rabun, such design would sustain operating temperatures up to 3,000 degrees, and a flash temperature of up to 4,000 degrees. The normal operating temperature is expected to be approximately 2,400 degrees. The refractory panels installed on the subject Rabun unit were poured on-site by Rabun, and evidence that little quality control was exercised. The panels are severely pitted and contain imbedded paper debris which, once combusted, will reveal further pitting of the interior surface walls of the "pit". The visible pitting is, in places, as deep as 2". The Applicant offered no proof that the refractory panels, as constructed, could reasonably be expected to maintain their structural integrity under normal operating temperatures or conditions. A failure of any panel during the operation of the unit would result in the emission of pollutants. Structural Integrity And Design Of Rabun Unit Plenum The plenum of the Rabun unit is installed on too of one of the sidewalls, and consists of a 34" diameter cylinder, with a 1" opening (nozzel) down its full 40' length. The plenum rests on five braces, which are welded to the outside frame, and is secured to three of these braces by jacks. Between the plenum nozzel and the sidewall is a gap which Rabun has filled with KAO- wool, a heat resistant insulation material. The structural support design of the plenum on the Rabun unit does not comport with good engineering practices. The braces on which the plenum rests lack important diagonal bracing and the welding is poor. The three jacks which secure the plenum, are inadequate to restrain its movement once an air mass begins flowing from the plenum's nozzel. The poor design of the structural support for the plenum, as well as the failure to adequately secure it, will result in the plenum being dislodged from the unit completely, or at the very least cause a change in the orientation of the nozzel and a disruption of the air current. In either event, pollutants would be freely emitted from the "pit". Further, such movement would also cause the KAO- wool to become dislodged, and emissions would escape through that gap. 2/ In addition to failing to establish that the plenum could maintain a fixed angle on the air curtain, the applicant also failed to demonstrate that the plenum could maintain an equal distribution of air at approximately 120mph throughout its length. The proof established that, as proposed, the velocity distribution of air flow coming out of the plenum nozzel would be approximately 160mph in the center of the unit, and decrease along its length to approximately 10mph at either end of the plenum nozzel. Consequently, due to the Rabun unit's inability to maintain an even air flow at approximately 120mph across the entire length of the 40' pit, the unit's air curtain will be ineffective, and pollutants can be reasonably expected to escape the unit while it is in operation. Design Of The Underfire Ventilation System The under fire system for the air curtain incinerator injects oxygen to super heat the materials and, thereby, increase combustion efficiency. One fan is provided by Rabun to power the underfire blower, and its intake is not screened or protected. The ingestion of foreign materials could interrupt the fan's operation, and the lack of air flow would decrease the efficiency of the burner. The proof failed to establish, however, that such inefficiency would adversely affect air quality. The proof does, however, demonstrate that the injection of cold underfire air into the "pit", which would occur if the blower failed and were subsequently restarted, could precipitate an expulsion of debris and smoke from the unit or a thermal explosion. Neither the Applicant nor Rabun's "operating instructions" addressed this operational problem. Design Of The Air Flow Duct Work To The Plenum The design of the Rabun unit's fan and duct work does not conform with good engineering practices. The intake for the fan, which generates the air flow to the plenum, is located close to the wall of the pit. So sited, the fan will be drawing hot air for the plenum, which will decrease the air flow reaching the plenum. The duct work which connects the fan with the plenum is made of vinyl fabric, and no proof was offered regarding its heat resistant characteristics. This duct work is located immediately behind the KAO-wool filled gap between the plenum's nozzel and the top of the pit wall. When the plenum moves, and this KAO-wool is dislodged, ash, flame and other debris may reasonable be expected to contact the vinyl duct work. If its integrity is destroyed, there would be no air curtain to retain the pollutants in the "pit". Location Of The Unit The subject air curtain incinerator is located a distance greater than 1,000' from an active portion of the landfill, as required by DER rules. A Synopsis The Applicant failed to provide reasonable assurances that the Rabun air curtain incinerator would not cause pollution in violation of the Department's rules. No Rabun unit has ever been tested or its efficiency demonstrated. The professional who certified the subject application did little more than assure that the fan used to drive air to the plenum was sufficient to deliver an adequate volume of air. Beyond that, he assumed the structural integrity of the unit and that its design comported with good engineering practices. The engineer's assumptions in this case were sorely misplaced.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED: That the permit application of Saint Lucie Incinerator be DENIED. DONE AND ORDERED this 23rd day of April, 1987, in Tallahassee, Florida. WILLIAM J. KENDRICK Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 23rd day of April, 1987.

# 8
WALTER PIERCE AND ANNETTE PIERCE vs S.M.G., INC. AND DEPARTMENT OF ENVIRONMENTAL PROTECTION, 02-003871 (2002)
Division of Administrative Hearings, Florida Filed:Crystal River, Florida Sep. 19, 2002 Number: 02-003871 Latest Update: Jun. 03, 2003

The Issue The issue presented is whether Respondent, S.M.G., Inc. (SMG), has provided reasonable assurance that its existing air curtain incinerator will be operated in accordance with applicable statutory and rule provisions.

Findings Of Fact The Parties The Department is the state agency responsible for receiving applications for, and the issuance of, permits for the construction and operation of air curtain incinerators in the State of Florida. SMG is a contracting company, with residential, trucking, agricultural, and commercial driver's license divisions. SMG is the applicant for a permit to operate an air curtain incinerator. Petitioners reside in Citrus County, Florida, in the vicinity of the constructed and operational air curtain incinerator. For the most part, Petitioners reside northeast, east, or southeast of the site. The Petitioners demonstrated their standing in this proceeding. SMG's Construction Permit On May 23, 2001, SMG submitted an application for an air construction permit to the Department's Southwest District Office. The application sought authorization to construct an air curtain incinerator "[o]n the east or west side of 6844 N. Citrus Avenue, Crystal River," Citrus County, Florida. 1 The general purpose of pursuing this permit was to burn wood waste. On July 9, 2001, the Department issued SMG a Notice of Intent to Issue the Proposed Air Construction Permit (Permit No. 0170360-001-AC). A copy of the Notice of Intent was published in the Citrus Times in Citrus County on July 19, 2001. On August 6, 2001, the Department issued SMG an air construction permit for the proposed air curtain incinerator. The construction permit authorized the construction of a McPherson Systems, Inc. - Model M30E air curtain destructor (incinerator) with under fire air at a natural non-Title V facility. Pursuant to the terms of the construction permit, in November 2001, SMG constructed an air curtain incinerator on approximately 500 acres of land on the east side of State Route 495 north of Crystal River in Citrus County, Florida, on property owned by the Gerrits family. See Endnote 1. Pursuant to the construction permit, SMG installed a McPherson Systems, Inc. - Model M30E air curtain incinerator with under fire air, a refractory lined burning pit, three upper chamber refractory lined walls (ten feet high), and a stainless steel spark arrester screen. The manifold blower and under fire air fans are powered by an electric engine. The manufacture designs and specifications for the McPherson model were submitted with the application for the air construction permit and admitted in evidence. Construction of a portable air curtain incinerator with a blower/fan system powered by a diesel-fired engine was contemplated by the air construction permit. Although cheaper, SMG instead chose to install the McPherson model that would produce the cleanest burn, i.e., one with fewer emissions, that was operated by electricity. The McPherson model used by SMG is recognized as an efficient, reliable model of air curtain incinerator. The diesel-fired blower/fan/engine system contemplated by the construction permit is considered exempt from permitting. An engine operated by electricity has no emissions and therefore does not require an air permit from the Department. The Department could not require a permit for the blower/fan system alone. The operating permit supercedes the construction permit, except as amended. Testing after Construction of the Incinerator On November 23, 2001, SMG began operating the air curtain incinerator. Pursuant to Special Condition 22 of the air construction permit, an initial visible emissions (VE) (opacity test) compliance test was performed on November 23, 2001, by Bernard A. Ball, Jr., an environmental engineer with Southern Environmental Services, Inc. The results of the initial VE compliance test were within the opacity limits contained in the construction permit. Specific Condition 19 of the construction permit requires SMG to maintain daily operating logs of the air curtain incinerator's daily operations. In order to obtain an air operating permit, a permit applicant is required to demonstrate compliance with the Department's rules and with the conditions of the construction permit. The Department requires an applicant for an operating permit to submit copies of recent daily operating records for the facility and copies of the emissions test required by the construction permit. These operating records are submitted in order for the Department to determine whether the applicant is complying with the applicable emissions standards and that the applicant is, in fact, maintaining the required operating logs as required by the construction permit. In order for SMG to obtain the operating permit for the incinerator, Specific Condition 28 of the construction permit required SMG to file an application for an air operating permit with the Department within 45 days of testing and required the application to include a copy of the VE test report and copies of at least two recent weeks of daily operating logs. On March 14, 2002, a second VE test was conducted by Mr. Ball, which also indicated that emissions were within the construction permit's opacity limits. On April 1, 2002, SMG submitted its application for the air operation permit to the Department. The application was signed by Sean Gerrits, and contained copies of the VE test reports for the November 2001 and March 2002 tests, as well as three and one-half months of daily operating logs, certificates showing that the incinerator operators were trained, and photographs of the incinerator in operation. SMG submitted the documentation required under the construction permit. On April 19, 2002, Robert E. Soich, Jr., air compliance inspector for the Department's Southwest District Office, performed an unannounced inspection and conducted a VE test in response to a complaint by Mr. Leonard Kaplan (a Petitioner), complaining of odors present. Excessive visible emissions were observed by Mr. Soich on April 19, 2002. The incinerator did not pass the VE test because of the improper alignment of the blade angle on the manifold of the blower system and because of green leaves and inadequate drying of the materials to be burned in the incinerator. Mr. Soich also observed, in part, that "materials need to be prepared better for burning." As a result of this unannounced inspection and the negative VE test, the Department requested SMG to provide an explanation of the VE test results and of the type of changes SMG planned to implement to correct the problem. On learning of the problem, SMG shut down the incinerator and called a McPherson mechanical contractor to come out and adjust the blade angle. Southern Environmental Services conducted another VE test to ensure the problem had been corrected. On April 22, 2002, a VE test was conducted by Southern Environmental Services on-site which showed compliance with the construction permit. On April 30, 2002, SMG advised the Department that adjustments were made to the baffles to correct the angles. SMG provided the Department with the April 22, 2002, VE test results. SMG also implemented better operational procedures. On May 30, 2002, with Mr. Soich present, SMG, by Byron E. Nelson, performed another VE test. The test results showed compliance with the opacity limits in the construction permit and the results were submitted to the Department.2 Mr. Nelson, an environmental engineer with Southern Environmental Sciences, testified that he has been involved in preparing approximately two dozen applications for air curtain incinerators and has conducted probably "thousands" of visible emissions tests. Mr. Nelson is certified by the State of Florida to conduct VE tests. He has seen "two or three dozen" air curtain incinerators in operation and has conducted VE tests on about 20 of them. Based on his experience, Mr. Nelson testified that SMG employed the same practices and controls to control odor, smoke, and fugitive emissions as other such incinerators he is familiar with. He testified that the amount of smoke and odors from the SMG incinerator is similar to that emitted from other air curtain incinerators, and that the fugitive emissions from the SMG incinerator were probably less than others he is familiar with. Based on his experience, Mr. Nelson opined that SMG has taken reasonable measures to minimize odor, smoke and dust/particulates from the operation of the incinerator. Mr. Nelson likewise opined that the SMG incinerator is well run, perhaps better run than other incinerators. (Mr. Nelson had been on the SMG site twice when the incinerator was operating and burning wood products.) Based on his experience, Mr. Nelson opined that SMG meets the requirements necessary to obtain an air operating permit from the Department and has demonstrated that it has complied with the conditions of its construction permit. Mr. Soich is the air compliance inspector for the Department's Southwest District Office. He testified that he has inspected the operations of other air curtain incinerators over the last 15 years. Mr. Soich testified that SMG is one of the "better operators" of air curtain incinerators he is familiar with. (Mr. Soich visited the SMG site approximately nine times from March 13, 2002, to October 15, 2002.) Mr. McDonald is the Air Permitting Engineer for the Southwest District Office of the Department. He is responsible for reviewing all applications for air curtain incinerators in the Southwest District and has reviewed applications for between 25 and 30 incinerators. Mr. McDonald reviewed the SMG permit applications. Based on the latest VE test results, copies of the records attached to the operating permit application, and his experience, Mr. McDonald, for the Department, determined that SMG had demonstrated compliance with the conditions of the construction permit and recommended issuance of the operating permit for the incinerator. He maintained the same position at hearing. SMG provided assurance that the DeRosa Fire Department would respond in the event of a fire at the incinerator. On June 19, 2002, the Department issued the proposed air operating permit. Operation of the Air Curtain Incinerator Emissions from the incinerator are controlled by a curtain of forced air at a very high static pressure over and around the burning pit. The air curtain traps smoke and small particles and recirculates them to enhance combustion and reduce smoke. The underfire air introduces air underneath the air curtain to ensure complete combustion and minimize opacity at start-up. The refractory-tiled ceramic concrete burn pit provides a safe combustion chamber, and the refractory panels keep excess heat from escaping. The upper chamber refractory panels, which surround three sides of the burn pit, allow more retention time in the burner to better control opacity and sparks. The stainless screen spark arrestor also controls sparks and debris from leaving the burner. The operating permit application proposed the use of an air curtain blower along with a manifold to provide forced air to the burning pit. According to the manufacturer specifications, the blower can force air into the pit at velocities of between 100 and 120 mph. This ensures that the flames in the burn pit receive enough oxygen to combust completely. The air circulates inside the burn pit to ensure a complete burn, which reduces smoke and odor. The combustion temperature for the burning pit ranges from approximately 1,800 to 2,500 degrees Fahrenheit. The operating permit allows a maximum charging rate of ten tons per hour on a daily average basis and 31,200 tons per any consecutive 12 month period. The incinerator has been operating below the maximum charging rate. The operating permit limits the hours of operation (charging) to 3,120 hours per year, i.e., ten hours/day, six days/week, 52 weeks/year. According to various SMG operating and maintenance logs, the incinerator has been operated below this limit. The operating permit, in accordance with Rule 62- 296.401(7), Florida Administrative Code, allows the burning of only wood waste, yard waste, and clean lumber, and prohibits the burning/incineration of materials such as sawdust, paper, trash, tires, garbage, rubber material, plastics, liquid wastes, Bunker C residual oil, roofing materials, tar, asphalt, railroad cross ties, or other creosoted lumber, chemically treated or painted wood, and other similar materials. Biological waste shall not be burned in the incinerator. During its operation, the incinerator only burned wood and yard waste, and Mr. Gerrits testified that the waste materials are inspected before being burned in order to ensure that no prohibited materials are burned. If any non-authorized materials are observed, they are removed before the waste is burned. See Finding of Fact 24. The operating permit allows visible emissions during start-up periods (not to exceed the first 30 minutes of operation) of an opacity up to 35 percent, averaged over a six- minute period, as provided for in Rule 62-296.401(7)(a)-(b), Florida Administrative Code. The McPherson model is designed to meet the requirements of the above-referenced rule, and the VE tests run during start-up periods (except one performed by Mr. Soich on April 19, 2002) demonstrated compliance with this requirement. Id. The operating permit limits visible emissions outside of start-up periods (the first 30 minutes of daily operation) to no more that five percent opacity, with visible emissions of up to ten percent opacity allowed up to three minutes in any one hour as provided for in Rule 62-296.401(7)(a), Florida Administrative Code, and 40 Code of Federal Regulations Part 60, Subpart CCCC, adopted and incorporated by reference in Rule 62- 204.800(8)(b)74, Florida Administrative Code. (Rule 62- 296.401(7)(a) permits up to 20 percent opacity. The ten percent rate is required by the new federal standard. See SMG Exhibit 13, page 3 of 9.) The opacity limits in the operating permit are more stringent than those contained in the construction permit, which allows visible emissions of up to 20 percent opacity up to three minutes in any one-hour period. (By definition, a "visible emission" is "[a]n emission greater than 5 percent opacity or 1/4 Ringelmann measured by standard methods." Rule 62-296.200(278), Florida Administrative Code.) The VE test results submitted by SMG demonstrate compliance with the opacity limits in the operating permit and with the opacity limits in the construction permit for the days tested. See Findings of Fact 18, 22, 27, and 29. The operating permit requires that the incinerator must be attended at all times while materials are being burned and that public access to the incinerator must be restricted. A certified operator is in attendance whenever the incinerator is operated, i.e., when something is burning in the incinerator. A fence has been constructed around the property. The operating permit prohibits starting the incinerator before sunrise and requires that all charging of the incinerator be completely stopped before sunset as required by Rule 62- 296.401(7)(h), Florida Administrative Code. Mr. Gerrits testified that the incinerator is never started before sunrise and is typically started after 8:00 a.m. Mr. Gerrits testified that the incinerator is never charged after sunset and that charging typically stops at 4:00 or 5:00 p.m. See Endnote 4. These practices are consistent with the Operations and Maintenance Guide for the incinerator. The operating permit limits the height of the ash in the burning pit to one-third of the depth of the pit or to a point where the ash begins to impede combustion, whichever occurs first as provided in Rule 62-296.401(7)(m), Florida Administrative Code. The one-third depth line is marked on the outside of the incinerator. Mr. Gerrits testified that ash is regularly removed from the burning pit every third day to keep the ash level low, which helps ensure better combustion and reduces smoke. The operating permit provides that material shall not be loaded into the incinerator in such a way that it will protrude above the air curtain. Testimony established that the SMG incinerator is properly loaded. The operating permit requires that all operators of the incinerator be trained in the proper operation and maintenance of the incinerator and that an operations and maintenance guide be maintained at the facility at all times. All of the operators of the SMG incinerator have taken a four-hour training course to learn how to operate the incinerator in accordance with Department regulations and good operating practices, and certificates attesting to that training were submitted with the application for the operating permit. An Operations and Maintenance Guide was submitted with the application for the construction permit. The operating permit requires the maintenance of a daily operating log. The daily operating log must be maintained at the facility for at least five years and must be available for inspection by the Department upon request. SMG currently maintains a daily operating log that meets the requirements of the construction permit. SMG submits those daily logs to the Department on a monthly basis after the Department requested that SMG do so. The log includes a date and site location, daily operating hours, total charges, total material charged in tons, average hourly charging rate, any maintenance performed, fuel usage in gallons, and the operator's signature. The logs of record contain this information and have been initialed by SMG's operator for each day when the incinerator has been operated. SMG operators responsible for preparing the logs have no incentive to indicate the incinerator is not operating on days or during hours when it is running, as a deliberate misstatement on the operating logs could result in enforcement action by the Department and being fired by SMG. The operating permit requires that all reasonable precautions be undertaken to prevent and control the generation of unconfined emissions of particulate matter in accordance with Rule 62-296.320(4)(c), Florida Administrative Code. SMG takes reasonable precautions to prevent and control the generation of unconfined emissions of particulate matter, including paving the road that leads to the incinerator to reduce dust, wetting the ashes removed from the burn pit, wetting the ash piles and ramp that addresses the incinerator, approaching the incinerator at a slow rate, and placing a charge into the incinerator slowly and carefully. SMG voluntarily added a sprinkler system on all four corners of the burning pit that was not contemplated by the construction permit. The Department witness Mr. McDonald testified that this provided an additional method to control unconfined emissions. Although the construction permit and proposed permit do not contain conditions prohibiting the burning of green wood or wet wood waste, SMG takes precautions at the request of Mr. Soich to ensure that the wood is properly dried before being burned. See Finding of Fact 24. This helps to reduce smoke and emissions from the incinerator. (Moisture is the primary factor that inhibits burning and causes smoke and potentially odor.) As part of the routine practice in handling the wood waste before it is burned, trucks bringing wood waste to the incinerator are instructed to dump it into a pile. SMG operators then use a loader to flatten out the pile and remove dirt, prohibited materials, and harvestable pieces of wood. Harvestable pieces of wood and dirt are removed to separate staging areas. The remaining wood waste is separated into long windrows, with the oldest row closest to the incinerator. The windrows are flipped or rolled over in the direction of the incinerator, allowing the waste to dry. The waste in the row closest to the incinerator is burned, and subsequent windrows are rolled over in its place. Ash is generally removed from the burn pit every third day; it is wetted on removal to reduce dust, and the ash piles adjacent to the incinerator are also kept wetted by the sprinkler system. The ash is eventually mixed with the dirt in a composter for use as Class-A unrestricted compost. The SMG operator in charge on a particular day decides whether the incinerator will operate that day, in accordance with standard operational practices. The operator checks the weather forecast. If it is raining or if there are high winds (over 20 miles per hour), the incinerator will not be operated that day, and SMG typically waits four days after a rain to begin operating the incinerator again. These procedures are not contained in any permit conditions. The purpose of not operating during or immediately after a rain and taking steps to ensure the wood is dry is to reduce smoke; wet wood smokes more. Rainy weather can also affect odor. The purpose of not operating during windy conditions is to reduce the possibility of fire on SMG's property, but wind can also affect odor and visible emissions. On days when the incinerator is not operating, SMG conducts yard maintenance, maintains the waste windrows, and runs the composter. The composter is a source of noise and is located adjacent to the incinerator and is run when the incinerator is shut down. To ensure that the visible emission limitations are not exceeded and objectionable odors3 not generated, the operating permit requires that the incinerator's fan shall continue to operate after the last charge of the day until all combustion (presence of any flame or smoke) has ceased. Generally, the incinerator keeps burning an hour to an hour and one-half. Mr. Gerrits testified that the fan is kept running until the flames and smoke die out and that a certified operator is present until the fan is switched off. The operating permit requires that the testing of visible emissions must be conducted within 90-100 percent of the maximum allowable charging rate of 10 tons/hour and shall be conducted when the highest emissions can reasonable be expected to occur.4 Testing of the SMG incinerator was conducted at within 90-100 percent of the maximum allowable charging rate of 10 tons per hour, and the May 30, 2002, test results indicated that the incinerator was operating within the opacity limits of its permit even when operating at close to maximum capacity. Evidence established that the May 30, 2002, VE test complied with the specific conditions of both the construction and operating permit. See Finding of Fact 29. The test method for visible emissions required by both the construction permit and the operating permit is EPA Method 9, adopted and incorporated by reference at Rule 62- 204.800(8)(b)74, Florida Administrative Code. (Method 22 is not required pursuant to Department rules for compliance testing of an air curtain incinerator.) Testimony established that Method 9 was the method used for the VE tests conducted on the SMG incinerator. As required by both the construction and operating permits, the incinerator is located in excess of 300 feet from any pre-existing occupied building located off site as required by Rule 62-296.401(7)(j), Florida Administrative Code. The closest residences, that of Mr. Gerrits' father and his tenant, are approximately 1,500 feet away. Petitioners' Challenge For the most part, Petitioners reside northeast, east, or southeast of the incinerator. One Petitioner resides approximately three-tenths of a mile southeast of the incinerator; others reside at greater distances, up to approximately a mile and one-half away from the incinerator. Each of the Petitioners who testified have resided in this area for many years, pre-dating the operation of the incinerator. The Petitioners who testified were credible and well- intentioned. Each of these Petitioners maintained daily logs covering several months when the incinerator was authorized to operate. Some kept logs for several months, while others kept logs for several days. They noted their observations and perceptions in the logs. Admittedly, Petitioners are not experts in the detection of odors or noise levels. Nevertheless, they recorded their own experiences as to what they saw, heard, and/or smelled, believing that the odors and noise came from the incinerator. Some recorded that they smelled the strong odor of smoke, an "acrid smell," a "pungent smell," for example; "it makes your eyes burn and throat burn" said another during the hearing. One witness described the experience as being a prisoner in his house. Another does not go outside when the smell is bad. Generally, the level of odor varied with the weather conditions, i.e., a stronger odor was noticed on foggy and wet days or nights and when the wind blows from the west, which Petitioners contend is the prevailing wind. Some witnesses only smelled the odor during the night and not during the day, and not all of the time. Some complained about the odor and noise, or one and not the other. Some believed the noise coming from the incinerator was a major problem. At least two witnesses who live approximately three-tenths of a mile and 3,500 feet, respectively, from the incinerator site, described the noise as being like a jet airplane. One witness shuts her windows to keep out the noise. (SMG also operates a "wood chipper" or "composter" on site which is loud. Mr. Gerrits stated that he did not think the sound was the same as made by the incinerator fan. He also stated that "[i]t doesn't exceed the noise decibels. It doesn't exceed background noise levels at [their] property line.") Petitioners documented their concerns which are described, in part, above, and also documented their complaints to the Department and local government. It appears that each of the logs prepared by the Petitioners (who kept logs) were given to Petitioner Martha Futscher, who summarized and compiled a hand-written master list of the complaints. Then, Mr. Harvey inputted this data on the master list (spread sheet) of complaints, which appears as Petitioners' Exhibit F1. The master list contains recorded observations from May 2002 through January 2003. The master list contains a representation of when the incinerator started and stopped for various days and when it was operational or not, and this information was derived, according to Mr. Harvey, from the logs maintained by SMG. The master list also provides tons per hour of waste burned on particular days, the observer's initials, and the approximate distance each observer lived from the incinerator, and the comments, with time of observation or perception noted. There are discrepancies between the master list and the actual logs maintained by SMG as to when the incinerator was operational. There also appears to be several differences in observations between the Petitioners' master list and other evidence which indicates when Mr. Soich inspected the incinerator and determined that the incinerator was operating satisfactorily. Compare Petitioners' Exhibit 2 with Petitioners' Exhibit F1. For example, the master list records an observation from May 30, 2002, when the incinerator was operating, when there was noise and smoke noted at 8:00 a.m., and flames at the incinerator and odor at 5:30 p.m. Conversely, Mr. Soich was on-site on May 30, 2002, and observed the scheduled VE test. No problems were noted with the operation on this date by Mr. Soich. Mr. Soich also noted that "wood waste was properly dry and free of debris." The VE test on May 30, 2002, was performed from 10:29 a.m. to 11:59 a.m. and showed compliance with opacity limits. The master list indicates that black smoke was observed (no time given) on May 7, 2002, when the incinerator was operational, yet Mr. Soich inspected the incinerator on that day and there is a notation in the record that the incinerator was operating between 0-5 percent visible emissions. (Mr. Soich opined that it should be very rare to smell objectionable odors if the visible emissions run at a 5 percent level.) For October 15, 2002, there is a notation in the master list that a Petitioner commented that the incinerator was running during the day ("AM/PM Running") and that there was a strong smell at approximately 7:05 p.m. A strong smell at the person's house was also noted at approximately 9:30 p.m. on that day. However, Mr. Soich performed an annual inspection of the incinerator on October 15, 2002, and there is a notation on the master list, Petitioners' Exhibit 2, that the incinerator was not operating due to recent rain. As one Petitioner testified, her point was that the inspectors are not there when she hears the noise, sees smoke, and smells the odor. Mr. Soich confirmed that he does not inspect the facility in the evening. Petitioners also provided, as evidence in support of their position, six videotapes of the incinerator for September 19, October 3, October 23, November 25 (2 tapes), 2002, and January 10, 2003. (Mr. Harvey took the videotapes from the same location, across the street and west of the incinerator.) Each tape, except for September 19, 2002, showed smoke emanating from the operational incinerator. On September 19, 2002, the incinerator was not running according to the SMG log. There was a malfunction which was reported to the Department. The SMG log indicates that the pit was cleaned out, site cleared and rows moved. There is also a notation in the SMG log for this date that there was a power failure/malfunction at the incinerator at 9:00 a.m., and that the power was out. According to Mr. Gerrits, the malfunction caused smoke. (One Petitioner observed smoke from ashes on September 19, 2002.) While the Petitioners proved that there was smoke emanating from the operation of the incinerator on the days which were videotaped, with the exception of September 19, 2002, this did not necessarily prove that the emissions exceeded the requirements of the Department rules or that there was an objectionable odor emanating therefrom. Mr. Stoich observed the videotapes played during the hearing. In particular, with respect to the January 10, 2003, videotape, Petitioners' Exhibit 12, Mr. Stoich stated that a level of opacity cannot be determined from photographs and videotapes. He also noted that there was "a lot of white smoke," an atypical situation according to him, emanating from the incinerator and that he, as a compliance inspector, would have investigated further and performed an inspection, including a VE test, to determine if there was a violation, had he seen this smoke. However, he stated that without actually seeing the operation, he could not determine whether a violation had occurred. There was persuasive evidence that compliance with the opacity limits of a permit can only be determined through VE tests conducted using the Department-approved EPA Method 9. The VE test takes into account wind, the angle of the plume, the position of the sun, and other factors, and must use appropriate averaging to ensure that the test is valid. A smoke plume can look quite dense at the wrong angle or if the light is reflecting off the plume in a certain way, when in fact it is in compliance with Department rules. The VE tests for the incinerator have, with one exception, see Finding of Fact 24, demonstrated compliance with the opacity limits in the construction permit. As noted herein, upon receipt of notice that one VE test failed, SMG implemented corrective actions, and two VE tests conducted after the time showed the incinerator was operating in compliance with the opacity limits of the permit. See Findings of Fact 27 and 29. The Department relies on its compliance inspectors, such as Mr. Soich, to make a determination of whether an air emission source is causing an objectionable odor. There does not appear to be an approved Department method for measuring odors from incinerators. (Mr. Nelson stated that odors are difficult to test and that "odor is done collecting samples." No samples were taken or analyzed.) On the other hand, Mr. Soich testified that, based on his years of experience, he has developed certain methods for determining whether a facility is emitting an objectionable odor under the rules. If he receives an odor complaint, which he has in this case, he goes to the site and checks the prevailing winds. He also travels around the facility to determine the source of the odor. An odor can be deemed objectionable if it is very strong and overpowering, such that he cannot stay on- site and breathe in the odors. An odor can also be deemed objectionable if, after being on-site for some extended period of time, he begins to develop symptoms such as runny eyes, a scratchy throat, or a headache as a result of the smell. Finally, he may bring along another Department employee to determine whether the other individual finds the odor objectionable. Enforcement actions can be taken if objectionable odors are detected. Mr. Soich testified that he has inspected the incinerator at least nine times in the past year and never detected an objectionable odor. On some of the visits, the incinerator was not operational. On rebuttal, several residents of the area testified that they had not experienced objectionable odors from the incinerator. David Stevens, the Chief of the DeRosa County Fire Department, testified that an open land-clearing burn emits black smoke, more so than he observed from the incinerator. This fire department only had to respond to false alarms at the incinerator. Mr. Stevens personally inspected the operation of the incinerator and thought it was a very safe operation. Randy Morgan, a wildlife firefighter and certified burner with the Division of Forestry with over 16 years of experience in fire control, testified that approximately 50,000 acres of the state land burns occurred in Citrus County last year. These land burns can be a significant source of smoke and odor. In addition, approximately 50 open burn authorizations are issued each day. He also testified that controlled burns of approximately 15 fires of approximately 50 to 2,000 acres a day occurred in 2002 in proximity of the SMG incinerator which is a source of smoke and odor. The state also conducts open burns of some kind approximately ten months out of the year. Other witnesses testified that, given the rural nature of the community, open burning of trash, wood, and leaves occurs on a regular basis. Ultimate Findings of Fact Credible evidence established that SMG meets or exceeds the requirements in the construction permit to reduce smoke, dust, and odor, and these requirements are carried over to the operating permit. Credible evidence established that SMG employs the same, if not better, practices and permit conditions to control smoke, dust, and odor as other air curtain incinerators in the state. Credible evidence established that the SMG incinerator is operated in accordance with its construction permit. Credible evidence established that the SMG incinerator can be expected to be operated in accordance with its operating permit. Credible evidence established that the SMG incinerator is operated in accordance with Department rules. In light of the foregoing, SMG has demonstrated reasonable assurance that its air curtain incinerator has been operated in compliance with the construction permit and that the incinerator can continue to be operated in accordance with the conditions of the operating permit.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Environmental Protection enter a final order granting SMG's application and issuing Permit No. 0170360-002-AO, as amended, and subject to all conditions, including but not limited to the Specific Conditions set forth in the Department's Notice of Intent to Issue, for the operation of an air curtain incinerator in Citrus County, Florida. It is further recommended that Petitioners' challenge to the amendment to the operating permit be dismissed. See Preliminary Statement. DONE AND ENTERED this 21st day of April, 2003, in Tallahassee, Leon County, Florida.5 CHARLES A. STAMPELOS Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 21st day of April, 2003.

Florida Laws (2) 120.569120.57
# 9
BRIAN D. HARRINGTON vs S.M.G., INC. AND DEPARTMENT OF ENVIRONMENTAL PROTECTION, 02-003819 (2002)
Division of Administrative Hearings, Florida Filed:Crystal River, Florida Sep. 19, 2002 Number: 02-003819 Latest Update: Jun. 03, 2003

The Issue The issue presented is whether Respondent, S.M.G., Inc. (SMG), has provided reasonable assurance that its existing air curtain incinerator will be operated in accordance with applicable statutory and rule provisions.

Findings Of Fact The Parties The Department is the state agency responsible for receiving applications for, and the issuance of, permits for the construction and operation of air curtain incinerators in the State of Florida. SMG is a contracting company, with residential, trucking, agricultural, and commercial driver's license divisions. SMG is the applicant for a permit to operate an air curtain incinerator. Petitioners reside in Citrus County, Florida, in the vicinity of the constructed and operational air curtain incinerator. For the most part, Petitioners reside northeast, east, or southeast of the site. The Petitioners demonstrated their standing in this proceeding. SMG's Construction Permit On May 23, 2001, SMG submitted an application for an air construction permit to the Department's Southwest District Office. The application sought authorization to construct an air curtain incinerator "[o]n the east or west side of 6844 N. Citrus Avenue, Crystal River," Citrus County, Florida. 1 The general purpose of pursuing this permit was to burn wood waste. On July 9, 2001, the Department issued SMG a Notice of Intent to Issue the Proposed Air Construction Permit (Permit No. 0170360-001-AC). A copy of the Notice of Intent was published in the Citrus Times in Citrus County on July 19, 2001. On August 6, 2001, the Department issued SMG an air construction permit for the proposed air curtain incinerator. The construction permit authorized the construction of a McPherson Systems, Inc. - Model M30E air curtain destructor (incinerator) with under fire air at a natural non-Title V facility. Pursuant to the terms of the construction permit, in November 2001, SMG constructed an air curtain incinerator on approximately 500 acres of land on the east side of State Route 495 north of Crystal River in Citrus County, Florida, on property owned by the Gerrits family. See Endnote 1. Pursuant to the construction permit, SMG installed a McPherson Systems, Inc. - Model M30E air curtain incinerator with under fire air, a refractory lined burning pit, three upper chamber refractory lined walls (ten feet high), and a stainless steel spark arrester screen. The manifold blower and under fire air fans are powered by an electric engine. The manufacture designs and specifications for the McPherson model were submitted with the application for the air construction permit and admitted in evidence. Construction of a portable air curtain incinerator with a blower/fan system powered by a diesel-fired engine was contemplated by the air construction permit. Although cheaper, SMG instead chose to install the McPherson model that would produce the cleanest burn, i.e., one with fewer emissions, that was operated by electricity. The McPherson model used by SMG is recognized as an efficient, reliable model of air curtain incinerator. The diesel-fired blower/fan/engine system contemplated by the construction permit is considered exempt from permitting. An engine operated by electricity has no emissions and therefore does not require an air permit from the Department. The Department could not require a permit for the blower/fan system alone. The operating permit supercedes the construction permit, except as amended. Testing after Construction of the Incinerator On November 23, 2001, SMG began operating the air curtain incinerator. Pursuant to Special Condition 22 of the air construction permit, an initial visible emissions (VE) (opacity test) compliance test was performed on November 23, 2001, by Bernard A. Ball, Jr., an environmental engineer with Southern Environmental Services, Inc. The results of the initial VE compliance test were within the opacity limits contained in the construction permit. Specific Condition 19 of the construction permit requires SMG to maintain daily operating logs of the air curtain incinerator's daily operations. In order to obtain an air operating permit, a permit applicant is required to demonstrate compliance with the Department's rules and with the conditions of the construction permit. The Department requires an applicant for an operating permit to submit copies of recent daily operating records for the facility and copies of the emissions test required by the construction permit. These operating records are submitted in order for the Department to determine whether the applicant is complying with the applicable emissions standards and that the applicant is, in fact, maintaining the required operating logs as required by the construction permit. In order for SMG to obtain the operating permit for the incinerator, Specific Condition 28 of the construction permit required SMG to file an application for an air operating permit with the Department within 45 days of testing and required the application to include a copy of the VE test report and copies of at least two recent weeks of daily operating logs. On March 14, 2002, a second VE test was conducted by Mr. Ball, which also indicated that emissions were within the construction permit's opacity limits. On April 1, 2002, SMG submitted its application for the air operation permit to the Department. The application was signed by Sean Gerrits, and contained copies of the VE test reports for the November 2001 and March 2002 tests, as well as three and one-half months of daily operating logs, certificates showing that the incinerator operators were trained, and photographs of the incinerator in operation. SMG submitted the documentation required under the construction permit. On April 19, 2002, Robert E. Soich, Jr., air compliance inspector for the Department's Southwest District Office, performed an unannounced inspection and conducted a VE test in response to a complaint by Mr. Leonard Kaplan (a Petitioner), complaining of odors present. Excessive visible emissions were observed by Mr. Soich on April 19, 2002. The incinerator did not pass the VE test because of the improper alignment of the blade angle on the manifold of the blower system and because of green leaves and inadequate drying of the materials to be burned in the incinerator. Mr. Soich also observed, in part, that "materials need to be prepared better for burning." As a result of this unannounced inspection and the negative VE test, the Department requested SMG to provide an explanation of the VE test results and of the type of changes SMG planned to implement to correct the problem. On learning of the problem, SMG shut down the incinerator and called a McPherson mechanical contractor to come out and adjust the blade angle. Southern Environmental Services conducted another VE test to ensure the problem had been corrected. On April 22, 2002, a VE test was conducted by Southern Environmental Services on-site which showed compliance with the construction permit. On April 30, 2002, SMG advised the Department that adjustments were made to the baffles to correct the angles. SMG provided the Department with the April 22, 2002, VE test results. SMG also implemented better operational procedures. On May 30, 2002, with Mr. Soich present, SMG, by Byron E. Nelson, performed another VE test. The test results showed compliance with the opacity limits in the construction permit and the results were submitted to the Department.2 Mr. Nelson, an environmental engineer with Southern Environmental Sciences, testified that he has been involved in preparing approximately two dozen applications for air curtain incinerators and has conducted probably "thousands" of visible emissions tests. Mr. Nelson is certified by the State of Florida to conduct VE tests. He has seen "two or three dozen" air curtain incinerators in operation and has conducted VE tests on about 20 of them. Based on his experience, Mr. Nelson testified that SMG employed the same practices and controls to control odor, smoke, and fugitive emissions as other such incinerators he is familiar with. He testified that the amount of smoke and odors from the SMG incinerator is similar to that emitted from other air curtain incinerators, and that the fugitive emissions from the SMG incinerator were probably less than others he is familiar with. Based on his experience, Mr. Nelson opined that SMG has taken reasonable measures to minimize odor, smoke and dust/particulates from the operation of the incinerator. Mr. Nelson likewise opined that the SMG incinerator is well run, perhaps better run than other incinerators. (Mr. Nelson had been on the SMG site twice when the incinerator was operating and burning wood products.) Based on his experience, Mr. Nelson opined that SMG meets the requirements necessary to obtain an air operating permit from the Department and has demonstrated that it has complied with the conditions of its construction permit. Mr. Soich is the air compliance inspector for the Department's Southwest District Office. He testified that he has inspected the operations of other air curtain incinerators over the last 15 years. Mr. Soich testified that SMG is one of the "better operators" of air curtain incinerators he is familiar with. (Mr. Soich visited the SMG site approximately nine times from March 13, 2002, to October 15, 2002.) Mr. McDonald is the Air Permitting Engineer for the Southwest District Office of the Department. He is responsible for reviewing all applications for air curtain incinerators in the Southwest District and has reviewed applications for between 25 and 30 incinerators. Mr. McDonald reviewed the SMG permit applications. Based on the latest VE test results, copies of the records attached to the operating permit application, and his experience, Mr. McDonald, for the Department, determined that SMG had demonstrated compliance with the conditions of the construction permit and recommended issuance of the operating permit for the incinerator. He maintained the same position at hearing. SMG provided assurance that the DeRosa Fire Department would respond in the event of a fire at the incinerator. On June 19, 2002, the Department issued the proposed air operating permit. Operation of the Air Curtain Incinerator Emissions from the incinerator are controlled by a curtain of forced air at a very high static pressure over and around the burning pit. The air curtain traps smoke and small particles and recirculates them to enhance combustion and reduce smoke. The underfire air introduces air underneath the air curtain to ensure complete combustion and minimize opacity at start-up. The refractory-tiled ceramic concrete burn pit provides a safe combustion chamber, and the refractory panels keep excess heat from escaping. The upper chamber refractory panels, which surround three sides of the burn pit, allow more retention time in the burner to better control opacity and sparks. The stainless screen spark arrestor also controls sparks and debris from leaving the burner. The operating permit application proposed the use of an air curtain blower along with a manifold to provide forced air to the burning pit. According to the manufacturer specifications, the blower can force air into the pit at velocities of between 100 and 120 mph. This ensures that the flames in the burn pit receive enough oxygen to combust completely. The air circulates inside the burn pit to ensure a complete burn, which reduces smoke and odor. The combustion temperature for the burning pit ranges from approximately 1,800 to 2,500 degrees Fahrenheit. The operating permit allows a maximum charging rate of ten tons per hour on a daily average basis and 31,200 tons per any consecutive 12 month period. The incinerator has been operating below the maximum charging rate. The operating permit limits the hours of operation (charging) to 3,120 hours per year, i.e., ten hours/day, six days/week, 52 weeks/year. According to various SMG operating and maintenance logs, the incinerator has been operated below this limit. The operating permit, in accordance with Rule 62- 296.401(7), Florida Administrative Code, allows the burning of only wood waste, yard waste, and clean lumber, and prohibits the burning/incineration of materials such as sawdust, paper, trash, tires, garbage, rubber material, plastics, liquid wastes, Bunker C residual oil, roofing materials, tar, asphalt, railroad cross ties, or other creosoted lumber, chemically treated or painted wood, and other similar materials. Biological waste shall not be burned in the incinerator. During its operation, the incinerator only burned wood and yard waste, and Mr. Gerrits testified that the waste materials are inspected before being burned in order to ensure that no prohibited materials are burned. If any non-authorized materials are observed, they are removed before the waste is burned. See Finding of Fact 24. The operating permit allows visible emissions during start-up periods (not to exceed the first 30 minutes of operation) of an opacity up to 35 percent, averaged over a six- minute period, as provided for in Rule 62-296.401(7)(a)-(b), Florida Administrative Code. The McPherson model is designed to meet the requirements of the above-referenced rule, and the VE tests run during start-up periods (except one performed by Mr. Soich on April 19, 2002) demonstrated compliance with this requirement. Id. The operating permit limits visible emissions outside of start-up periods (the first 30 minutes of daily operation) to no more that five percent opacity, with visible emissions of up to ten percent opacity allowed up to three minutes in any one hour as provided for in Rule 62-296.401(7)(a), Florida Administrative Code, and 40 Code of Federal Regulations Part 60, Subpart CCCC, adopted and incorporated by reference in Rule 62- 204.800(8)(b)74, Florida Administrative Code. (Rule 62- 296.401(7)(a) permits up to 20 percent opacity. The ten percent rate is required by the new federal standard. See SMG Exhibit 13, page 3 of 9.) The opacity limits in the operating permit are more stringent than those contained in the construction permit, which allows visible emissions of up to 20 percent opacity up to three minutes in any one-hour period. (By definition, a "visible emission" is "[a]n emission greater than 5 percent opacity or 1/4 Ringelmann measured by standard methods." Rule 62-296.200(278), Florida Administrative Code.) The VE test results submitted by SMG demonstrate compliance with the opacity limits in the operating permit and with the opacity limits in the construction permit for the days tested. See Findings of Fact 18, 22, 27, and 29. The operating permit requires that the incinerator must be attended at all times while materials are being burned and that public access to the incinerator must be restricted. A certified operator is in attendance whenever the incinerator is operated, i.e., when something is burning in the incinerator. A fence has been constructed around the property. The operating permit prohibits starting the incinerator before sunrise and requires that all charging of the incinerator be completely stopped before sunset as required by Rule 62- 296.401(7)(h), Florida Administrative Code. Mr. Gerrits testified that the incinerator is never started before sunrise and is typically started after 8:00 a.m. Mr. Gerrits testified that the incinerator is never charged after sunset and that charging typically stops at 4:00 or 5:00 p.m. See Endnote 4. These practices are consistent with the Operations and Maintenance Guide for the incinerator. The operating permit limits the height of the ash in the burning pit to one-third of the depth of the pit or to a point where the ash begins to impede combustion, whichever occurs first as provided in Rule 62-296.401(7)(m), Florida Administrative Code. The one-third depth line is marked on the outside of the incinerator. Mr. Gerrits testified that ash is regularly removed from the burning pit every third day to keep the ash level low, which helps ensure better combustion and reduces smoke. The operating permit provides that material shall not be loaded into the incinerator in such a way that it will protrude above the air curtain. Testimony established that the SMG incinerator is properly loaded. The operating permit requires that all operators of the incinerator be trained in the proper operation and maintenance of the incinerator and that an operations and maintenance guide be maintained at the facility at all times. All of the operators of the SMG incinerator have taken a four-hour training course to learn how to operate the incinerator in accordance with Department regulations and good operating practices, and certificates attesting to that training were submitted with the application for the operating permit. An Operations and Maintenance Guide was submitted with the application for the construction permit. The operating permit requires the maintenance of a daily operating log. The daily operating log must be maintained at the facility for at least five years and must be available for inspection by the Department upon request. SMG currently maintains a daily operating log that meets the requirements of the construction permit. SMG submits those daily logs to the Department on a monthly basis after the Department requested that SMG do so. The log includes a date and site location, daily operating hours, total charges, total material charged in tons, average hourly charging rate, any maintenance performed, fuel usage in gallons, and the operator's signature. The logs of record contain this information and have been initialed by SMG's operator for each day when the incinerator has been operated. SMG operators responsible for preparing the logs have no incentive to indicate the incinerator is not operating on days or during hours when it is running, as a deliberate misstatement on the operating logs could result in enforcement action by the Department and being fired by SMG. The operating permit requires that all reasonable precautions be undertaken to prevent and control the generation of unconfined emissions of particulate matter in accordance with Rule 62-296.320(4)(c), Florida Administrative Code. SMG takes reasonable precautions to prevent and control the generation of unconfined emissions of particulate matter, including paving the road that leads to the incinerator to reduce dust, wetting the ashes removed from the burn pit, wetting the ash piles and ramp that addresses the incinerator, approaching the incinerator at a slow rate, and placing a charge into the incinerator slowly and carefully. SMG voluntarily added a sprinkler system on all four corners of the burning pit that was not contemplated by the construction permit. The Department witness Mr. McDonald testified that this provided an additional method to control unconfined emissions. Although the construction permit and proposed permit do not contain conditions prohibiting the burning of green wood or wet wood waste, SMG takes precautions at the request of Mr. Soich to ensure that the wood is properly dried before being burned. See Finding of Fact 24. This helps to reduce smoke and emissions from the incinerator. (Moisture is the primary factor that inhibits burning and causes smoke and potentially odor.) As part of the routine practice in handling the wood waste before it is burned, trucks bringing wood waste to the incinerator are instructed to dump it into a pile. SMG operators then use a loader to flatten out the pile and remove dirt, prohibited materials, and harvestable pieces of wood. Harvestable pieces of wood and dirt are removed to separate staging areas. The remaining wood waste is separated into long windrows, with the oldest row closest to the incinerator. The windrows are flipped or rolled over in the direction of the incinerator, allowing the waste to dry. The waste in the row closest to the incinerator is burned, and subsequent windrows are rolled over in its place. Ash is generally removed from the burn pit every third day; it is wetted on removal to reduce dust, and the ash piles adjacent to the incinerator are also kept wetted by the sprinkler system. The ash is eventually mixed with the dirt in a composter for use as Class-A unrestricted compost. The SMG operator in charge on a particular day decides whether the incinerator will operate that day, in accordance with standard operational practices. The operator checks the weather forecast. If it is raining or if there are high winds (over 20 miles per hour), the incinerator will not be operated that day, and SMG typically waits four days after a rain to begin operating the incinerator again. These procedures are not contained in any permit conditions. The purpose of not operating during or immediately after a rain and taking steps to ensure the wood is dry is to reduce smoke; wet wood smokes more. Rainy weather can also affect odor. The purpose of not operating during windy conditions is to reduce the possibility of fire on SMG's property, but wind can also affect odor and visible emissions. On days when the incinerator is not operating, SMG conducts yard maintenance, maintains the waste windrows, and runs the composter. The composter is a source of noise and is located adjacent to the incinerator and is run when the incinerator is shut down. To ensure that the visible emission limitations are not exceeded and objectionable odors3 not generated, the operating permit requires that the incinerator's fan shall continue to operate after the last charge of the day until all combustion (presence of any flame or smoke) has ceased. Generally, the incinerator keeps burning an hour to an hour and one-half. Mr. Gerrits testified that the fan is kept running until the flames and smoke die out and that a certified operator is present until the fan is switched off. The operating permit requires that the testing of visible emissions must be conducted within 90-100 percent of the maximum allowable charging rate of 10 tons/hour and shall be conducted when the highest emissions can reasonable be expected to occur.4 Testing of the SMG incinerator was conducted at within 90-100 percent of the maximum allowable charging rate of 10 tons per hour, and the May 30, 2002, test results indicated that the incinerator was operating within the opacity limits of its permit even when operating at close to maximum capacity. Evidence established that the May 30, 2002, VE test complied with the specific conditions of both the construction and operating permit. See Finding of Fact 29. The test method for visible emissions required by both the construction permit and the operating permit is EPA Method 9, adopted and incorporated by reference at Rule 62- 204.800(8)(b)74, Florida Administrative Code. (Method 22 is not required pursuant to Department rules for compliance testing of an air curtain incinerator.) Testimony established that Method 9 was the method used for the VE tests conducted on the SMG incinerator. As required by both the construction and operating permits, the incinerator is located in excess of 300 feet from any pre-existing occupied building located off site as required by Rule 62-296.401(7)(j), Florida Administrative Code. The closest residences, that of Mr. Gerrits' father and his tenant, are approximately 1,500 feet away. Petitioners' Challenge For the most part, Petitioners reside northeast, east, or southeast of the incinerator. One Petitioner resides approximately three-tenths of a mile southeast of the incinerator; others reside at greater distances, up to approximately a mile and one-half away from the incinerator. Each of the Petitioners who testified have resided in this area for many years, pre-dating the operation of the incinerator. The Petitioners who testified were credible and well- intentioned. Each of these Petitioners maintained daily logs covering several months when the incinerator was authorized to operate. Some kept logs for several months, while others kept logs for several days. They noted their observations and perceptions in the logs. Admittedly, Petitioners are not experts in the detection of odors or noise levels. Nevertheless, they recorded their own experiences as to what they saw, heard, and/or smelled, believing that the odors and noise came from the incinerator. Some recorded that they smelled the strong odor of smoke, an "acrid smell," a "pungent smell," for example; "it makes your eyes burn and throat burn" said another during the hearing. One witness described the experience as being a prisoner in his house. Another does not go outside when the smell is bad. Generally, the level of odor varied with the weather conditions, i.e., a stronger odor was noticed on foggy and wet days or nights and when the wind blows from the west, which Petitioners contend is the prevailing wind. Some witnesses only smelled the odor during the night and not during the day, and not all of the time. Some complained about the odor and noise, or one and not the other. Some believed the noise coming from the incinerator was a major problem. At least two witnesses who live approximately three-tenths of a mile and 3,500 feet, respectively, from the incinerator site, described the noise as being like a jet airplane. One witness shuts her windows to keep out the noise. (SMG also operates a "wood chipper" or "composter" on site which is loud. Mr. Gerrits stated that he did not think the sound was the same as made by the incinerator fan. He also stated that "[i]t doesn't exceed the noise decibels. It doesn't exceed background noise levels at [their] property line.") Petitioners documented their concerns which are described, in part, above, and also documented their complaints to the Department and local government. It appears that each of the logs prepared by the Petitioners (who kept logs) were given to Petitioner Martha Futscher, who summarized and compiled a hand-written master list of the complaints. Then, Mr. Harvey inputted this data on the master list (spread sheet) of complaints, which appears as Petitioners' Exhibit F1. The master list contains recorded observations from May 2002 through January 2003. The master list contains a representation of when the incinerator started and stopped for various days and when it was operational or not, and this information was derived, according to Mr. Harvey, from the logs maintained by SMG. The master list also provides tons per hour of waste burned on particular days, the observer's initials, and the approximate distance each observer lived from the incinerator, and the comments, with time of observation or perception noted. There are discrepancies between the master list and the actual logs maintained by SMG as to when the incinerator was operational. There also appears to be several differences in observations between the Petitioners' master list and other evidence which indicates when Mr. Soich inspected the incinerator and determined that the incinerator was operating satisfactorily. Compare Petitioners' Exhibit 2 with Petitioners' Exhibit F1. For example, the master list records an observation from May 30, 2002, when the incinerator was operating, when there was noise and smoke noted at 8:00 a.m., and flames at the incinerator and odor at 5:30 p.m. Conversely, Mr. Soich was on-site on May 30, 2002, and observed the scheduled VE test. No problems were noted with the operation on this date by Mr. Soich. Mr. Soich also noted that "wood waste was properly dry and free of debris." The VE test on May 30, 2002, was performed from 10:29 a.m. to 11:59 a.m. and showed compliance with opacity limits. The master list indicates that black smoke was observed (no time given) on May 7, 2002, when the incinerator was operational, yet Mr. Soich inspected the incinerator on that day and there is a notation in the record that the incinerator was operating between 0-5 percent visible emissions. (Mr. Soich opined that it should be very rare to smell objectionable odors if the visible emissions run at a 5 percent level.) For October 15, 2002, there is a notation in the master list that a Petitioner commented that the incinerator was running during the day ("AM/PM Running") and that there was a strong smell at approximately 7:05 p.m. A strong smell at the person's house was also noted at approximately 9:30 p.m. on that day. However, Mr. Soich performed an annual inspection of the incinerator on October 15, 2002, and there is a notation on the master list, Petitioners' Exhibit 2, that the incinerator was not operating due to recent rain. As one Petitioner testified, her point was that the inspectors are not there when she hears the noise, sees smoke, and smells the odor. Mr. Soich confirmed that he does not inspect the facility in the evening. Petitioners also provided, as evidence in support of their position, six videotapes of the incinerator for September 19, October 3, October 23, November 25 (2 tapes), 2002, and January 10, 2003. (Mr. Harvey took the videotapes from the same location, across the street and west of the incinerator.) Each tape, except for September 19, 2002, showed smoke emanating from the operational incinerator. On September 19, 2002, the incinerator was not running according to the SMG log. There was a malfunction which was reported to the Department. The SMG log indicates that the pit was cleaned out, site cleared and rows moved. There is also a notation in the SMG log for this date that there was a power failure/malfunction at the incinerator at 9:00 a.m., and that the power was out. According to Mr. Gerrits, the malfunction caused smoke. (One Petitioner observed smoke from ashes on September 19, 2002.) While the Petitioners proved that there was smoke emanating from the operation of the incinerator on the days which were videotaped, with the exception of September 19, 2002, this did not necessarily prove that the emissions exceeded the requirements of the Department rules or that there was an objectionable odor emanating therefrom. Mr. Stoich observed the videotapes played during the hearing. In particular, with respect to the January 10, 2003, videotape, Petitioners' Exhibit 12, Mr. Stoich stated that a level of opacity cannot be determined from photographs and videotapes. He also noted that there was "a lot of white smoke," an atypical situation according to him, emanating from the incinerator and that he, as a compliance inspector, would have investigated further and performed an inspection, including a VE test, to determine if there was a violation, had he seen this smoke. However, he stated that without actually seeing the operation, he could not determine whether a violation had occurred. There was persuasive evidence that compliance with the opacity limits of a permit can only be determined through VE tests conducted using the Department-approved EPA Method 9. The VE test takes into account wind, the angle of the plume, the position of the sun, and other factors, and must use appropriate averaging to ensure that the test is valid. A smoke plume can look quite dense at the wrong angle or if the light is reflecting off the plume in a certain way, when in fact it is in compliance with Department rules. The VE tests for the incinerator have, with one exception, see Finding of Fact 24, demonstrated compliance with the opacity limits in the construction permit. As noted herein, upon receipt of notice that one VE test failed, SMG implemented corrective actions, and two VE tests conducted after the time showed the incinerator was operating in compliance with the opacity limits of the permit. See Findings of Fact 27 and 29. The Department relies on its compliance inspectors, such as Mr. Soich, to make a determination of whether an air emission source is causing an objectionable odor. There does not appear to be an approved Department method for measuring odors from incinerators. (Mr. Nelson stated that odors are difficult to test and that "odor is done collecting samples." No samples were taken or analyzed.) On the other hand, Mr. Soich testified that, based on his years of experience, he has developed certain methods for determining whether a facility is emitting an objectionable odor under the rules. If he receives an odor complaint, which he has in this case, he goes to the site and checks the prevailing winds. He also travels around the facility to determine the source of the odor. An odor can be deemed objectionable if it is very strong and overpowering, such that he cannot stay on- site and breathe in the odors. An odor can also be deemed objectionable if, after being on-site for some extended period of time, he begins to develop symptoms such as runny eyes, a scratchy throat, or a headache as a result of the smell. Finally, he may bring along another Department employee to determine whether the other individual finds the odor objectionable. Enforcement actions can be taken if objectionable odors are detected. Mr. Soich testified that he has inspected the incinerator at least nine times in the past year and never detected an objectionable odor. On some of the visits, the incinerator was not operational. On rebuttal, several residents of the area testified that they had not experienced objectionable odors from the incinerator. David Stevens, the Chief of the DeRosa County Fire Department, testified that an open land-clearing burn emits black smoke, more so than he observed from the incinerator. This fire department only had to respond to false alarms at the incinerator. Mr. Stevens personally inspected the operation of the incinerator and thought it was a very safe operation. Randy Morgan, a wildlife firefighter and certified burner with the Division of Forestry with over 16 years of experience in fire control, testified that approximately 50,000 acres of the state land burns occurred in Citrus County last year. These land burns can be a significant source of smoke and odor. In addition, approximately 50 open burn authorizations are issued each day. He also testified that controlled burns of approximately 15 fires of approximately 50 to 2,000 acres a day occurred in 2002 in proximity of the SMG incinerator which is a source of smoke and odor. The state also conducts open burns of some kind approximately ten months out of the year. Other witnesses testified that, given the rural nature of the community, open burning of trash, wood, and leaves occurs on a regular basis. Ultimate Findings of Fact Credible evidence established that SMG meets or exceeds the requirements in the construction permit to reduce smoke, dust, and odor, and these requirements are carried over to the operating permit. Credible evidence established that SMG employs the same, if not better, practices and permit conditions to control smoke, dust, and odor as other air curtain incinerators in the state. Credible evidence established that the SMG incinerator is operated in accordance with its construction permit. Credible evidence established that the SMG incinerator can be expected to be operated in accordance with its operating permit. Credible evidence established that the SMG incinerator is operated in accordance with Department rules. In light of the foregoing, SMG has demonstrated reasonable assurance that its air curtain incinerator has been operated in compliance with the construction permit and that the incinerator can continue to be operated in accordance with the conditions of the operating permit.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Environmental Protection enter a final order granting SMG's application and issuing Permit No. 0170360-002-AO, as amended, and subject to all conditions, including but not limited to the Specific Conditions set forth in the Department's Notice of Intent to Issue, for the operation of an air curtain incinerator in Citrus County, Florida. It is further recommended that Petitioners' challenge to the amendment to the operating permit be dismissed. See Preliminary Statement. DONE AND ENTERED this 21st day of April, 2003, in Tallahassee, Leon County, Florida.5 CHARLES A. STAMPELOS Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 21st day of April, 2003.

Florida Laws (2) 120.569120.57