The Issue At issue is whether respondent's motion for summary recommended order should be granted.
Recommendation Based on the foregoing, it is RECOMMENDED that a final order be entered dismissing the administrative complaint filed in this matter. DONE AND ENTERED in Tallahassee, Leon County, Florida, this 30th day of April 1990. WILLIAM J. KENDRICK Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 30th day of April, 1990.
The Issue The issue in this case is whether Florida Administrative Code Rule 40E-7.523(2)(c) is an invalid exercise of delegated legislative authority.*
Findings Of Fact The Parties 1. The District is a public corporation existing by virtue of Chapter 25270, Laws of Florida (1949), and operating pursuant to Chapter 373, Florida Statutes, and Title 40E-7, Florida Administrative Code, asa multipurpose water management district, with its principal office in West Palm Beach, Florida. 2. KRVSA is a Florida corporation whose members are substantially affected by the rule in question. 3. Phillip B. Griner is an individual who holds a Special Use License to use the Lower Reedy Creek Management Area/Rough Island Management Unit Protected Zone. He has been a member of KVSA since its inception in 1998 and was serving on its board of directors at the time of the final hearing.
Conclusions Based upon the foregoing Findings of Fact and Conclusions of Law, the Petition for Administrative Hearing is denied. DONE AND ORDERED this 19th day of December, 2003, in Tallahassee, Leon County, Florida. Pan ate J. LAWRENCE JOHNSTON Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 19th day of December, 2003.
Other Judicial Opinions A party who is adversely affected by this Final Order is entitled to judicial review pursuant to Section 120.68, Florida Statutes. Review proceedings are governed by the Florida Rules of Appellate Procedure. Such proceedings are commenced by filing the original notice of appeal with Clerk of the Division of Administrative Hearings and a copy, accompanied by filing fees prescribed by law, with the District Court of Appeal, First District, or with the District Court of Appeal in the Appellate District where the party resides. The notice of appeal must be filed within 30 days of rendition of the order to be reviewed. 31
Findings Of Fact This application is a request for a consumptive use permit for two wells located in Pasco County, Florida, within the Pithlachascotee Basin. The subject wells are also located in that area wherein the Board of Governors of the Southwest Florida Water Management District declared a water shortage in Order No. 76-3D, Southwest Florida Water Management District. The application seeks an average daily withdrawal of 95,000 gallons with a maximum daily withdrawal of 360,000 gallons. The use of this water is for public supply involving effluent disposal by on-site percolation and ponding. This-use was existing prior to January 1, 1975 with am average daily withdrawal for 1974 of 74,000 gallons. The testimony presented by staff members of the Southwest Florida Water Management District establishes that the consumptive use for which a permit is sought will not violate any of the criteria set forth in Subsections 163- 2.11(2)(3) or (4), Florida Administrative Code, except that the use may significantly induce salt water encroachment. No evidence was presented showing that the sought for consumptive use will, in fact, significantly induce salt water encroachment. In the twelve month period ending October, 1975, applicant's highest average daily withdrawal was 81,000 gallons. This time frame corresponds to that time frame referred to in paragraph 1 of Water Shortage Order No. 76-3D, Southwest Florida Water Management District. In view of Water Shortage Order No. 76-3D, Southwest Florida Water Management District, the staff recommends granting of the permit for an average daily withdrawal of 81,000 gallons and a maximum daily withdrawal of four times that figure or 234,000 gallons. The staff further recommends imposition of the following conditions: That the permittee shall install totalizer flow meters of the propeller driven type on all withdrawal points covered by the permit with the exception of those wells which are currently ganged together using a single meter. That the permittee shall submit to the District a record of his pumpage for each meter, said pumpage to be read on a monthly basis and submitted quarterly to the District on April 15, July 15, October 15, and January 15 for each preceding calendar quarter. That all individual connections to the system be metered. That the permittee have water samples from all wells permitted analyzed for chloride on a monthly basis and results submitted to the District by April 15, July 15, October 15, and January 15 for each preceding calendar year.
Findings Of Fact Application No. 76-00408 is for an existing water use from six wells. The application seeks a total average annual withdrawal of 3.298 million gallons per day and a maximum daily withdrawal of 9.801 million gallons per day. The wells will be located in the Peace River basin in Polk County. Ninety-nine percent of the water will be used for industrial purposes and one percent of the water will be used for irrigation purposes. The applied for consumptive use will not violate any of the conditions set forth in Subsection 16J-2.11(2), (3) or (4), Florida Administrative Code. The Southwest Florida Water Management District's staff recommends granting of the subject permit in the amounts requested with the following conditions: That the applicant shall install totalizing flowmeters of the propeller-driven type on all withdrawal points with the exception of the well to be used for agriculture located at , Latitude 27 degrees 45 minutes 39 seconds, Longitude 81 degrees 37 minutes 07 seconds and the fire well located at Latitude 270 54 minutes 39 seconds, Longitude 81 degrees 36 minutes 00 seconds. The applicant shall submit to the district a record of pumpage for each meter installed in (a) above on a quarterly basis beginning January 15, 1977, with the pumpage recorded on a weekly basis.
Recommendation It is hereby RECOMMENDED that a consumptive use permit in accordance with Application No. 76-00408 be issued with the conditions set forth in paragraph 3 above. ENTERED this 13th day of October, 1976, in Tallahassee, Florida. CHRIS H. BENTLEY Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 COPIES FURNISHED: Jay T. Ahern, Esquire Citrus World, Inc. Staff Attorney Post Office Box 1111 Southwest Florida Water Lake Wales, Florida 33853 Management District Post Office Box 457 Brooksville, Florida 33512
The Issue Whether Florida Administrative Code Rule 2B-1.002 is an "invalid exercise of delegated legislative authority," as alleged by Petitioner.
The Issue Whether the South Florida Water Management District’s (“District”) intended award of a contract for aerial spraying services, granular application services, and aerial transport services, to Coastal Air Services, Inc. (“Coastal”), is contrary to the District’s governing statutes, rules, policies, or the bid specifications; and, if so, whether the decision was clearly erroneous, contrary to competition, arbitrary, or capricious.
Findings Of Fact The Parties The District is an independent taxing authority created pursuant to section 373.069, Florida Statutes, with the authority to contract with private entities to maintain real property controlled by the District. See § 373.1401, Fla. Stat. HAI is a Florida corporation duly authorized to do business in the State of Florida with a business address of 1090 Airglades Boulevard in Clewiston, Florida. Coastal is a Florida corporation duly authorized to do business in the State of Florida with a business address of 7424 Coastal Drive in Panama City, Florida. The RFB On February 7, 2018, the District issued the RFB, soliciting bids for qualified respondents to provide the following: [F]urnish all labor, equipment, perform data entry and perform all operations for spraying of aquatic, ditchbank and invasive vegetation by helicopter and provide aerial flight services for site inspection and plant surveys. Both HAI and Coastal submitted timely bids, which the District deemed responsive and responsible under the terms of the RFB. The District deemed Coastal the lowest responsive and responsible bidder for aerial spraying, granular application, and aerial transport services. The District deemed HAI the lowest responsive and responsible bidder for spot spraying services. On May 11, 2018, the District posted its Notice of Intent to Award the respective contracts to Coastal and HAI. HAI challenges the award to Coastal because it is not a responsible bidder under the terms of the RFB. HAI’s challenge focuses on two items required to document the bidder’s responsibility to perform the requested services. First, the RFB requires the bidder to provide at least two helicopters certified pursuant to 14 CFR Part 133, Rotocraft External-Load Operations; and 14 CFR Part 137, Agricultural Aircraft Operations (Part 137 Certificate). Second, the RFB requires the bidder to demonstrate its ability to obtain required insurance coverage. Part 137 Certificate HAI contends that Coastal’s bid does not meet the responsibility provisions of the RFB because it did not include sufficient Part 137 Certificates for its subcontractor, HMC Helicopters (“HMC”). HAI contends the Part 137 Certificates are required to expressly state that aircraft are certified to dispense economic poisons. Petitioner’s argument fails for three reasons. First, the RFB does not require the bidder’s Part 137 Certificate to expressly endorse aircraft to dispense economic poisons.3/ Second, assuming the express endorsement was required, the requirement does not apply to HMC. The RFB defines the term “Bidder” and “Respondent” as “[a]ll contractors, consultants, organizations, firms or other entities submitting a Response to this RFB as a prime contractor.” (emphasis added). In its bid, Coastal is listed as the prime contractor, and HMC as a subcontractor. The RFB requires each Respondent to list at least two aircraft which are Part 133 and 137 certified. The requirement applies to Coastal as the primary contractor, not to its subcontractor. Coastal’s bid listed five aircraft with both Part 133 and 137 Certificates, actually exceeding the requirement for two such certified aircraft. Third, assuming an express endorsement for dispensing economic poisons was required, and that the requirement applied to HMC, HMC’s Part 137 Certificate documents HMC’s authority to dispense economic poisons. Pursuant to 14 CFR 137.3, “Agricultural aircraft operation” is defined as follows: [T]he operation of an aircraft for the purpose of (1) dispensing any economic poison, (2) dispensing any other substance intended for plant nourishment, soil treatment, propagation of plant life, or pest control, or (3) engaging in dispending activities directly affecting agriculture, horticulture, or forest preservation, but not including the dispensing of live insects. To obtain a Part 137 Certificate, the operator must pass a knowledge and skills test, which includes the safe handling of economic poisons and disposal of used containers for those poisons; the general effects of those poisons on plants, animals, and persons and precautions to be observed in using those poisons; as well as the primary symptoms of poisoning in persons, appropriate emergency measures in the case of poisoning, and the location of poison control centers. See 14 CFR § 137.19. However, if the operator applies for a Part 137 Certificate which prohibits dispensing of economic poisons, the applicant is not required to demonstrate the knowledge and skills listed above. See Id. HMCs’ certificates do not contain an express prohibition against dispensing economic poisons. The authorization for HMC’s aircraft to dispense economic poisons is inherent in its Part 137 Certificate. Coastal’s bid meets the solicitation requirement for at least two aircraft with Part 137 Certificates. Insurance Requirements The RFB requires each Respondent to “provide evidence of the ability to obtain appropriate insurance coverage.” Respondents may meet the insurability requirement by having their insurance agent either (1) complete and sign an insurance certificate which meets all of the requirements of Exhibit H to the RFB; or (2) issue a letter on the insurance agency’s letterhead stating that the Respondent qualifies for the required insurance coverage levels and that an insurance certificate meeting the District’s requirements will be submitted prior to the execution of the contract. In response to this requirement, Coastal submitted a letter from Sterlingrisk Aviation, dated March 6, 2018, stating, “All required coverage amounts are available to Coastal Air Service, Inc. to fulfill the requirements of this contract.” In the Re: line, the letter refers to the specific RFB at issue in this case. Coastal also submitted a certificate of insurance from Sterlingrisk Aviation demonstrating the levels of insurance coverage in effect at the time the bid was submitted, although the coverages are less than the amounts required under the RFB.4/ HAI takes issue with Coastal’s evidence of ability to obtain the required coverage because the letter from Sterlingrisk does not state “an insurance certificate reflecting the required coverage will be provided prior to the contract execution.” Based on the totality of the evidence, the undersigned infers that Sterlingrisk’s letter omits the language that a certificate “will be provided” prior to contract execution, because Sterlingrisk will issue an insurance certificate only when Coastal applies, and pays the premium, for the increased coverage limitations. The letter from Sterlingrisk substantially complies with the insurance requirements of the RFB, and constitutes competent, substantial evidence of Coastal’s ability to obtain the required insurance coverage. HAI introduced no evidence that Coastal obtained an economic advantage over HAI by failing to include language from its insurance agent that “an insurance certificate reflecting the required coverage will be provided prior to the contract execution.” Instead, HAI argued that by failing to enforce that provision of the RFB, the District cannot ensure the winning bidder will be responsible to undertake the contract. HAI argued that the District’s failure to adhere to this RFB requirement may create inefficiencies that “would result in the event that Coastal were unable to obtain the required insurance coverage” before execution of the contract. Coastal’s bid documents its eligibility for insurance coverage in the amounts required by the RFB. If Coastal does not provide said certificates, it will not be qualified for final execution or issuance of the contract.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Southwest Florida Water Management District enter a final order dismissing Helicopter Applicator, Inc.’s Petition. DONE AND ENTERED this 15th day of November, 2018, in Tallahassee, Leon County, Florida. S SUZANNE VAN WYK Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 15th day of November, 2018.
The Issue Whether the Southwest Florida Water Management District proved that Alan R. Behrens signed a pleading, motion, or other paper in this proceeding for an “improper purpose,” and, if so, whether sanctions should be imposed pursuant to Section 120.569(2)(e), Florida Statutes?
Findings Of Fact The Parties Alan R. Behrens has resided and owned property at 4740 Southwest Armadillo Trail, Arcadia, DeSoto County, Florida, since 1985. There is a two-inch free-flowing artesian well used for domestic purposes on this property. Mr. Behrens’ well is approximately 150 feet deep and draws water from the Intermediate aquifer. The well currently has no pumping mechanism, and Mr. Behrens relies on an unaided artesian flow to produce water, which at times is inadequate. In prior administrative cases and the case involving Has-Ben Groves, Mr. Behrens is concerned that the withdrawal of water in the amounts requested by others from areas near his property will impair his ability to draw adequate amounts of water from his well. Mr. Behrens stated that his purpose in challenging the Has-Ben Groves WUP “is to receive assurances that any proposed use is not going to adversely impact [his] well. That’s [his] general biggest, main goal.” He feels that he did not receive assurances from the District; therefore, his only option was to request a hearing. The Southwest Florida Water Management District is the administrative agency charged with the responsibility to conserve, protect, manage, and control water resources within its boundaries pursuant to Chapter 373, Florida Statutes, and the rules promulgated thereunder as Chapter 40D, Florida Administrative Code. The District has the statutory duty to review and approve or deny applications requesting consumptive water use permits. The Has-Ben Groves WUP Application On January 27, 2003, the District issued a notice of final agency action for approval of Water Use General Permit No. 20012410.000 issued to Has-Ben Groves. The WUP authorized annual average groundwater withdrawals of 31,100 gallons per day (gpd) to be used for irrigation of Has-Ben Groves’ 40-acre citrus grove. (Peak monthly withdrawals of 254,300 gpd and withdrawals for crop protection at 1,015,200 gpd were authorized.) Tomlinson previously owned the Has-Ben Groves’ 40 acres. The District previously permitted the well on the Has-Ben Groves 40 acres when Tomlinson owned the property. The Tomlinson well was previously permitted for 77,000 gpd on an annual basis, but the permit expired. Thus, Has-Ben Groves applied for a new WUP. The Has-Ben Groves permitted well site is located in Hardee County and is approximately 16 miles from Mr. Behrens’ artesian well in DeSoto County, and is expected to draw approximately 94 percent of its water from the Upper Floridan aquifer. Did Mr. Behrens sign a pleading, motion,or other paper for an improper purpose? On January 20, 2003, Mr. Behrens, by letter, asked the District to be advised of any agency action regarding five WUP applications, including the Has-Ben Groves application. In this letter, Mr. Behrens also requested, what he characterized as “public information,” “what the predicted drawdown to the intermediate and Floridan aquifers are.” He inquired further: “Please make sure the hydrologist includes this information. I have previously asked for this basic information; please do not force me to take legal action against SWFMD per the Sunshine law & other public information laws.” (Emphasis in original.) Mr. Behrens was copied with the District’s “Final Agency Action Transmittal Letter” sent to Has-Ben Groves on January 27, 2003. According to Mr. Behrens, “legal action” meant the filing of a petition requesting an administrative hearing. He felt that it was his only option to receive information and assurances. In particular, Mr. Behrens wanted the District to create and provide him with drawdown contours and modeling even if the District believed it was unnecessary. See Endnote 1. By letter dated January 29, 2003, the District, by Pamela A. Gifford, CLA, Office of General Counsel, responded to Mr. Behrens’ request for ‘predicted drawdown’ information and stated in part: “First, please be advised, the District does not prepare ‘predicted drawdown’ for all water use permits. Second, to ask for ‘predicted drawdown’ for permits, you are making a pubic records request. The District does not accept anticipatory public record requests. In other words, when the District receives a public records request, it will search for existing records responsive to the request as of the date of the public records request. . . . Third, the District will not create a record to respond to a public records request. If a ‘predicted drawdown’ exists, it will be provided to you, if it does not, it will not be created to answer your request.”1 By letter dated January 31, 2003, Mr. Behrens responded to the District’s January 29, 2003, letter referred to above and expressed his understanding that he could “expect the results of drawdown modeling to be included in Notices of Agency Action that [he] receive from the District.” Mr. Behrens requested the name of the District office and the hydrologist who reviewed the Has-Ben Groves WUP application; the location of the file; a statement that it was “apparently a new withdrawal”; a request to identify the amount of water coming from the Intermediate and Floridan aquifers; a query as to why the withdrawal would “be cased to only a depth of 120 feet; won’t this mean that much of the water will be drawn from the intermediate?” Mr. Behrens also requested “a copy of the drawdown modeling results (map).” Mr. Behrens advised that it was “very important that new groundwater withdrawals do not lower [his] well level further, because [he is] relying completely on artesian free-flowing pressure; every inch of level reduction creates further hardship for [him].” (During his deposition, Mr. Behrens felt that the District could produce the information on a “voluntary” basis in order to give him “assurances up front.”) By letter dated February 10, 2003, the District, by Ms. Gifford, responded to Mr. Behrens’ January 31, 2003, letter and advised him “that drawdown modeling will not be included in Notices of Agency Action that you receive from the District. The only way that you will receive the drawdown modeling is if the District has records related to the modeling at the time you make a specific public records request for same. For example, if you make a public records request today for drawdown modeling, the District will only provide records to you that are in our files as of today. You would have to make a subsequent public records request to get any records that were received or created by the District after today’s date.” (Emphasis in original.) Ms. Gifford also advised Mr. Behrens that he was being provided with “copies of documents that are responsive to [his] public records request dated January 31, 2003.” Mr. Behrens was provided with a copy of the Has-Ben Groves General Water Use Permit Application which indicated, in part, that the application was “new” as opposed to a “renewal” or “modification”; the location of the well site; that Has-Ben Groves intended to irrigate 40 acres for citrus; and that the construction date of the well was in “1960.” The word “existing” is written on the line describing, in part, the casing diameter, depth, and pump capacity. See Finding of Fact The name “Phillippi” is handwritten on page one of the application. (Michael Phillippi is a professional geologist and employed with the District for over nine years. He had a pre- application telephone conversation with the applicant for the Has-Ben Groves WUP.) A “Water Use Permit Evaluation Worksheet” was also enclosed which included, among other information, the names “Lucille” and “Deborah” and the initials of two persons. The record does not indicate that Mr. Behrens followed up with the District regarding the Has-Ben Groves application after receiving the District’s February 10, 2003, letter and enclosures. On February 19, 2003, Mr. Behrens filed a Petition for Formal Hearing challenging the District’s preliminary decision to approve the WUP. The District determined that the Petition was timely filed, but not in substantial compliance with the requirements of Section 120.569(2)(c), Florida Statutes, and Florida Administrative Code Rule 28-106.201(2), governing the initiation of administrative proceedings. The District issued an Order of Dismissal Without Prejudice on February 27, 2003. On March 12, 2003, Mr. Behrens filed an Amended Petition for Formal Hearing. Mr. Behrens alleged that the withdrawal to be authorized by the WUP “would use huge quantities of water from the intermediate aquifer, even though water from the Floridan aquifer is completely suitable for citrus irrigation”; is “very close” to Mr. Behrens’ “property and well”; and the “cone of depression in the Intermediate aquifer that would be caused by the new use will cause a reduction in Petitioner’s water level and pressure and impair the ability of his well to produce water.” (Mr. Behrens also alleged that “[t]he proposed well would be eight inches in diameter, 920 feet deep, and cased to only 120 feet.” See Finding of Fact 15.) Mr. Behrens also alleged that the District refused to provide certain information, such as predicted drawdown to area wells. He also raised numerous disputed issues of material fact. On May 23, 2003, the District deposed Mr. Behrens. During his deposition, Mr. Behrens was asked to identify all facts and documents or sources of information he relied on in making the allegations in the Amended Petition. Mr. Behrens testified that the challenged water use withdrawal “seems like a very excessive amount”; “is [c]lose enough to have an impact on [his] well”; “is going to have a drawdown, is going to have an impact on the aquifer” and he has “a well on the aquifer”; that “these wells are going to have a drawdown and they’re going to draw down [his] well”; and that his position, that the Has-Ben Groves well will have a drawdown impact on his well, is based upon “[s]cience and facts and common sense” and “the evidence is self-evident.” Mr. Behrens has “done no studies.” Rather, he relies on information, such as the documents he introduced into evidence and his knowledge about the area and the District, to support the allegations in the Petition and Amended Petition. See, e.g., Findings of Fact 22-23. He does not have enough money to hire experts. He relies on the District’s hydrologists for the information he requests and for assurances. Yet, Mr. Behrens did not contact any District hydrologist to discuss his concerns before he filed the Petition and Amended Petition. See also Findings of Fact 26-28. On June 17, 2003, Mr. Behrens responded to the District’s Interrogatories, which requested Mr. Behrens to identify all facts he relied upon in making his assertions, including all documents prepared or reviewed in connection with such assertions. Mr. Behrens stated that no specific documents were prepared or reviewed in connection with his assertions made in paragraph 6 of the Amended Petition, and that the assertions in paragraph 6 were “pure truth – there’s no need to go searching to prove the obvious!” (Paragraph 6 of the Amended Petition alleged: “The proposed new groundwater withdrawal would use huge quantities of water from the Intermediate aquifer, even though water from the Floridan aquifer is completely suitable for citrus irrigation.”) During the final hearing, Mr. Behrens claimed that prior to filing his Petition, he relied on his experience and the information he maintains regarding the District’s identification of water use problems, and the District’s March 2000 Horse Creek Draft Resource Evaluation Report, the “Water Resources in Jeopardy” report published during the early 1990’s, and the 1992 Recommended Order in Alan R. Behrens, et al. v. Consolidated Minerals, Inc. and Southwest Florida Water Management District, et al., Case Nos. 92-0953-92-0957, 1993 WL 944120 (DOAH April 20, 1993; SWFWMD Nov. 30, 1994), in which Hearing Officer Daniel M. Kilbride found that Mr. Behrens was substantially affected by the District’s then proposed renewal and modification of an existing WUP held by Consolidated Minerals. 1993 WL 944120, at *4. (In interrogatory responses, Mr. Behrens also identified a 1986 potentiometric surface map of the Intermediate aquifer, among other maps he might identify.) These documents do not provide information relevant to whether the challenged Has-Ben Groves water withdrawal meets the conditions for issuance of a WUP or would lead a reasonable person to allege that the challenged Has-Ben Groves water use and well would have an adverse impact on Mr. Behrens’ use of his well. Before filing his initial Petition and during the interval before he filed his Amended Petition, Mr. Behrens did not contact or speak to District staff who reviewed the Has-Ben Groves WUP application or District staff in the Bartow Service Office (the District service office responsible for permitting matters in Hardee County) to obtain information concerning the Has-Ben Groves permit application or to discuss his concerns regarding whether the proposed water use to be authorized by the WUP would adversely affect his well. But see Finding of Fact 13, which indicates that on January 31, 2003, Mr. Behrens posed several questions to the District, prior to filing his Petition, which apparently were left unanswered. It appears Mr. Behrens did not pursue this inquiry until he served the District with Interrogatories on May 29, 2003. Mr. Behrens did not review the District’s “work file” after filing his Petition. In his Proposed Final Order (PFO), Mr. Behrens provided a detailed chronology and analysis of the factors he considered that caused him to file prior challenges to District action and his challenge to the District’s intent to approve the Has-Ben Groves WUP. He has mistrusted the District over time and has had little faith that the District understands his “unique circumstance” and will protect his well from adverse impacts resulting from the issuance of WUPs. See, e.g., (T. 95- 96, 98, 100.) He notes in his PFO that it was not until the Has-Ben Groves case that he “started to have trust in the District staff’s reliance on regional well monitoring data (as its sole source of cumulative impact analysis).” According to Mr. Behrens, the District provided him with information during discovery from which he derived reasonable assurances. He also felt that based on his experience, he “did not contact the permit reviewers in this matter because, from experience, he knew he could not trust them to provide the necessary assurances with a few comments over the telephone.” Yet, because of his financial inability to hire experts, Mr. Behrens relies on the expertise of the District’s hydrologists for assurance that his well will not be adversely impacted. See, e.g., (T. 112) (District Exhibit 13, pp. 41-42, 55, 58-61.) Stated otherwise, Mr. Behrens wanted the District staff to provide him with proof of reasonable assurance and he filed the Petition and Amended Petition because he felt he did not receive appropriate proof. If this final hearing went forward, his intent was to ask questions of the District’s hydrologists regarding many of the documents in his possession and to ask “District staff, under oath, about specific matters related to the protection of his well and the intermediate aquifer, in general,” presumably as he had done in the Basso and Boran cases, for example. See, e.g. (District Exhibit 13, p. 59-60.) Then, the ALJ, after hearing all of evidence, would decide whether reasonable assurance was provided. Prior to and after Mr. Behrens filed his Amended Petition, the District maintained Regional Observation and Monitoring Program (ROMP) wells that provide cumulative monitoring information concerning the Intermediate and Floridan aquifer water levels throughout the District. ROMP well data are available to the public upon request. (In response to a question posed by Mr. Behrens during the final hearing, Mr. Balser stated that ROMP well data do not give absolute assurance or reflect “[e]xactly what is happening in the geology under [Mr. Behrens] property.” Mr. Balser stated that he “would have to do testing of [his] property. But this is the best guess we can make looking at it from a regional view.”) It is more than a fair inference that Mr. Behrens was familiar with ROMP well data and their application in specific cases as a result of his participation in prior administrative cases. See pp. 4-5, supra. He did not request ROMP well data available from the District prior to filing his Petition and Amended Petition, although he asked for the quantity of groundwater which was expected to be withdrawn from the Intermediate and Floridan aquifers. See Conclusions of Law 48- 50. District WUP information and other records are available for public inspection, including the use and permitting history of the water withdrawal challenged by Mr. Behrens in this proceeding. If Mr. Behrens had inquired of the District prior to filing his Petition and Amended Petition, Mr. Behrens could have learned that the well on the Has-Ben Groves property had been in existence as early as the 1960’s for citrus irrigation, was first permitted around 1974, had previously been authorized by the District for withdrawals of as much as 77,000 gpd, was expected to draw approximately 94 percent of its water from the Upper Floridan aquifer, and there was no reasonable basis to conclude that withdrawals of 31,100 gpd from the Has-Ben Groves well would cause any adverse impact to his well, which draws water from the Intermediate aquifer. Stated otherwise, at the time he filed his Petition and Amended Petition, Mr. Behrens had no reasonable factual basis to allege that withdrawals of 31,100 gpd from the Has-Ben Groves’ well, located approximately 16 miles from his well, would have an adverse impact on his use of water from his well. (An applicant for a WUP is required to provide, in part, reasonable assurance that the water use “[w]ill not adversely impact an existing legal withdrawal.” Fla. Admin. Code R. 40D- 2.301(1)(i).) On June 30, 2003, Mr. Behrens filed a “Notice of Voluntary Dismissal” and responded, in part, to the District’s Motion for Summary Recommended Order, but not the District’s request for attorney’s fees and costs. Mr. Behrens stated that he withdrew his Amended Petition because he obtained information that he did not have when he filed his Amended Petition and that addressed his concerns about impacts to his well. He claimed, in part, that being informed of the District’s plan to set minimum levels for the Intermediate aquifer had allayed his fears that he would be without an artesian free-flowing water supply. However, the challenged WUP did not address or involve the setting of minimum flow levels. Based on the foregoing, Mr. Behrens did not make a reasonable inquiry regarding the facts and applicable law. Using an objective standard, an ordinary person standing in Mr. Behrens’ shoes would not have prosecuted this claim if a reasonable inquiry had been conducted. Stated otherwise, Mr. Behrens did not have a “reasonably clear legal justification” to proceed based on his limited inquiry. Mr. Behrens signed the Petition and Amended Petition for an “improper purpose.” The District’s Request for Sanctions The District proved that its lawyers expended approximately 98.8 hours in responding to the challenge brought by Mr. Behrens and that the District incurred $426.25 in costs. An hourly rate of $125.00 per hour is a reasonable rate. The hours expended by District lawyers were reasonable. The costs incurred were reasonable. The District requests that sanctions be imposed in the amount of $12,350.00 for attorney's fees and $426.25 in costs. For the reasons more fully stated in the Conclusions of Law, based on the totality of the facts presented, the imposition of a sanction against Mr. Behrens in the amount of $500.00 (for costs and a small portion of fees) is appropriate.