Elawyers Elawyers
Washington| Change
Find Similar Cases by Filters
You can browse Case Laws by Courts, or by your need.
Find 49 similar cases
VARIAN INSTRUMENT GROUP vs SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT, 89-005058BID (1989)
Division of Administrative Hearings, Florida Filed:Brooksville, Florida Sep. 18, 1989 Number: 89-005058BID Latest Update: Feb. 07, 1990

Findings Of Fact In July, 1989 the District published its request for bids (number 8980) for an atomic absorption spetrophotometer in local newspapers and to prospective interested parties, as shown in joint Exhibit 1 in evidence. The specifications for the instrument were included in the bid package and were authored by Mark Rials, the District's Laboratory Supervisor. The District received two bids for the instrument in response to the request for bids, one from Varian for approximately $57,000 and one from Perkin-Elmer for approximately $59,900. Mark Rials evaluated the bids. Upon evaluation it was determined that the Varian instrument proposal did not meet bid specifications in three major areas. The specifications required a system capacity of 40 megabytes, hard drive capability. The capacity offered by Varian in its bid was for 20 megabytes. The specifications required a combination of a 5 1/4 inch disk drive for its computer system as well as a 3 1/2 inch disk drive. Varian only bid the 3 1/2 inch diskdrive. It did not offer the 5 1/4 inch disk drive which was required. Additionally, at item IX of the specifications, the District required that a list be submitted with the bid which stated, on an item-by-item basis, how the instrument met or exceeded the specifications. Each item in the specifications had been carefully selected to insure optimum performance for the laboratory so that exceptions to the specifications were required to be noted and attached in the bid response. Varian failed to conform to this item of the specifications. This item allowed a vendor to describe in its bid response how it could differently meet the specifications in a better manner or even exceed the specifications, but Varian failed to provide this itemized list. It was also determined that the Varian bid did not conform with the specifications of item IV page 4 of the invitation to bid document concerning the provision of service manuals, system and application software documentation, methods, manuals, parts catalogs, supplies, accessories, catalog, and training manuals. Conversely, it was determined that the Perkin-Elmer bid was responsive in all respects, met the bid specification in these major categories and was the most responsive bidder. After witness Rials conducted the evaluation of the bids, in terms of compliance with the specifications, he and the District determined that the Perkin-Elmer bid was the lowest, responsive bidder which met all specifications. It duly published the intended award and notified all bidders of the bid results. In this evaluation and award process it was demonstrated that the District followed all applicable procedures in its rules and policies concerning evaluation and award. Varian timely filed an objection to the award of the bid; and in accordance with its normal bid protest procedures, the District scheduled a conference between representatives of Varian and District representatives to review Varian's bid. Varian made several statements at that meeting which constituted a substantial deviation from the bid package it had earlier submitted and amounted to an attempted restructuring of its bid in an effort to meet bid specifications. The District declined to countenance this effort and adhered to its initial intent to reject the bid which was submitted by Varian and to not allow the attempted material deviations to be ascribed to Varian's bid, after the point of bid opening and announcement of award. In summary, based upon the bid specifications issued by the District the evaluator's determination concerning the specifications that the evaluator drafted was that the Varian instrument failed to meet bid specifications because of the major deficiencies in the areas found above, regarding systems capacity, computer disk drive availability, and specification response. It has clearly been demonstrated by competent substantial evidence that the District's decision to reject Varian's bid was a reasonable one. It was based solely on a fair comparison of the response of the two bids to the specifications contained in the invitation to bid and notice to all potential vendors. In consideration of the facts established by the evidence in this record, it is found that the bid by Perkin-Elmer substantially met all bid requirements or specifications, even though the Perkin-Elmer bid was the second low bidder in terms of dollar cost. Since the low-cost bidder, Varian, failed to meet major bid specifications, the facts demonstrate that the Perkin-Elmer bid was the most responsive of the two bids at issue and is, therefore, the best bid. Consequently, award should be given to the Perkin-Elmer bid for the instrument in question.

Recommendation Having considered the foregoing findings of fact and conclusions of law, the evidence of record, the candor and demeanor of the witnesses, and the pleading and arguments of the parties it is therefore RECOMMENDED: That the Southwest Florida Water Management District issue a final order denying the petition filed by Varian Instrument Group and awarding bid number 8980 to Perkin-Elmer Corporation, as the lowest, responsive bidder. DONE and ENTERED this 6th day of February, 1990, in Tallahassee, Florida. P. MICHAEL RUFF Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 7th day of February, 1990. APPENDIX Respondent's Proposed Findings of Fact 1-9 are accepted. Petitioner Filed No Proposed Findings of Fact. COPIES FURNISHED: Mr. Peter G. Hubbell Executive Director Southwest Florida Water Management District 2379 Broad Street Brooksville, FL 34609-6899 Mickey McAllister District Sales Manager Varian Instrument Group 505 Julie Rivers Road, Suite 150 Sugar Land, TX 77478 A. Wayne Alfieri, Esquire Edward B. Helvenston, Esquire Assistant General Counsel Southwest Florida Water Management District 2379 Broad Street Brooksville, FL 34609-6899

Florida Laws (1) 120.57
# 1
BSN SPORTS, LLC, A DELAWARE LIMITED LIABILITY COMPANY vs SCHOOL BOARD OF PALM BEACH COUNTY, A POLITICAL SUBDIVISION OF THE STATE OF FLORIDA, 15-001566BID (2015)
Division of Administrative Hearings, Florida Filed:West Palm Beach, Florida Mar. 19, 2015 Number: 15-001566BID Latest Update: Sep. 06, 2017

The Issue Whether, when making a recommendation to award ITB No. 15C-26K (Term Contract for the Purchase of Physical Education/Athletic Supplies, Equipment, and Uniforms) to (1) Matty's Sports (Matty's), (2) Simmons Team Sports (Simmons), (3) D&J Commerce Solutions, Inc., d/b/a OLC Team Solutions (D&J), and (4) Palm Beach Sports (PB Sports), Respondent, School Board of Palm Beach County (School Board), acted contrary to one or more governing statutes, rules, policies, or procurement specifications, or any combination thereof; and if so, for each such instance, whether the misstep was clearly erroneous, arbitrary or capricious, or contrary to competition.

Findings Of Fact ITB No. 15C-26K and the Bid Process On November 4, 2015, the School Board issued Invitation to Bid (ITB) No. 15C-26K entitled "Term Contract for the Purchase of Physical Education/Athletic Supplies, Equipment and Uniforms" for the provision of athletic equipment (hard goods) and athletic clothing, including uniforms (soft goods). The ITB offered prospective vendors the opportunity to bid on 26 items but did not require that a vendor offer a bid for each of the 26 identified items. The odd-numbered items were for hard goods and the even-numbered items were soft goods. Paragraph G,

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the School Board of Palm Beach County enter a final order that adopts the Findings of Fact and Conclusions of Law contained herein, dismisses the protest filed by BSN Sports, LLC, and upholds the awards of contracts ITB No. 15C-26K to Matty's Sports, Simmons Team Sports, D&J Commerce Solutions, Inc., and Palm Beach Sports. DONE AND ENTERED this 22nd day of July, 2015, in Tallahassee, Leon County, Florida. S MARY LI CREASY Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 22nd day of July, 2015.

Florida Laws (2) 120.569120.57
# 2
ROCHE DIAGNOSTIC SYSTEMS vs DEPARTMENT OF CORRECTIONS, 96-005570BID (1996)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Nov. 22, 1996 Number: 96-005570BID Latest Update: Feb. 12, 1997

The Issue The issue is whether Respondent Department of Corrections acted in a manner contrary to its governing statutes, rules or policies, or the bid specifications in giving notice of its intent to award the contract for Invitation to Bid No. 96-DC- 6847R to Intervenor Behring Diagnostics, Inc.

Findings Of Fact On February 19, 1996 the Department issued an ITB for the provision of automated drug testing equipment, an automated data management system, and drug assays for the analysis of urine specimens collected at the Department’s major institutions and community facilities. After receiving and reviewing bids from Roche, Behring, and Abbott Laboratories (Abbott), the Department issued a Notice of Intent to Reject All Bids on April 10, 1996. On April 30, 1996 the Department issued ITB 96-DC-6847R for the same services. The same three vendors, Roche, Behring and Abbott, submitted bids which were opened on June 5, 1996. On its face, Roche’s bid of $.60 per test was the lowest cost of the three bids. Behring submitted a bid of $.90 per test. The Department’s evaluation committee correctly determined that bids submitted by Roche and Abbott were not responsive to the bid specifications. Roche’s bid was not responsive because: (1) it failed to include the cost of a printer at each site as part of the equipment package; and (2) it failed to indicate the vendor’s unconditional willingness to provide litigation support at no cost to the Department in defense of a legal challenge to the vendor’s technology. The bid specifications clearly required that printers be included as part of the computer hardware. Roche did not list printers anywhere in the narrative portion of its bid response. Roche’s response stated that it covered all items pertaining to the system hardware portion of the bid. The response indicated that Roche would provide the Department with Antek-LabDAQ report management software and listed specific items of hardware that would be included. But Roche did not list a printer. Roche’s bid response stated that the LabDAQ system would print reports. Roche included copies of a sample report sheets. Roche submitted other information describing the LabDAQ system that contained pictures of a printer. It also submitted a magazine article reviewing the LabDAQ system which listed an “Okidata printer” as part of the required hardware. However, the article noted that the software could be purchased separately. Submittal of this information was insufficient to indicate that Roche’s bid included the cost of a printer. Roche’s failure to include a printer in its bid was a material deviation from the bid requirements. The ITB clearly required the vendor to provide unequivocal litigation support at no cost to the Department if someone challenged the provider’s technology in a court action. This was a material requirement in the ITB. Roche responded that “upon request from the State and if deemed necessary Roche will provide documentation, affidavits and sworn testimony to substantiate the performance of the technology incorporated in the OnLine system.” (Emphasis added.) This ambiguous response was not an absolute commitment for Roche to provide the litigation support required by the specifications. In one section of Roche’s response it stated that it was “not aware of any past or present lawsuits that have been filed in connection to the COBAS MIRA Plus or the OnLine reagents.” In another section, Roche responded that a federal district court upheld drug testing results provided from a COBAS/Online system. These inconsistent statements may have resulted in a minor deviation from the bid specification. However, they are sufficient to further undermine confidence in Roche’s bid as submitted. During the hearing, Roche presented testimony that it intended for its bid of $.60 per test to include both printers and unconditional litigation support. This testimony constitutes an inappropriate attempt to amend Roche’s bid response. It does not change the fact that Roche’s bid, on its face, was not responsive as submitted. On the other hand, Behring’s bid was responsive to the specifications. It contained only one minor irregularity that provided no advantage to Behring. Roche has presented no evidence to the contrary. The Department’s evaluation committee did not complete the scoring process to compare the three vendors’ scores. Such a comparison is unnecessary where there is only one responsive bidder. By letter dated August 26, 1996 the Department again informed the vendors that it intended to reject all bids and issue a new request for proposals in September. Even though the Department had determined that Behring was the only responsive bidder, the letter did not address the responsiveness of any of the bids. The letter stated that the Department anticipated making changes to the specifications that would require a more structured response, i.e. revise the ITB to include a checklist for every required item which the bidder would cross-reference in its bid response. There is no evidence that the Department anticipated making changes to the substance of the specifications. On or about September 5, 1996 Behring sent the Department a Notice of Intent to protest the rejection of all bids and subsequently filed a timely formal written protest. In its formal protest, Behring referred to the Department’s conclusions in a memorandum dated August 23, 1996 that Behring was the only bidder to submit a conforming bid. Roche did not file a protest of the decision to reject all bids. On or about September 26, 1996 the Department sent Roche notice of Behring’s protest and enclosed a copy of Behring’s formal protest in Division of Administrative Hearings Case Number 96-4475BID. Roche did not intervene in the bid protest. The final hearing in the bid protest was scheduled for final hearing on October 23, 1996. The day before the hearing, representatives of the Department and Behring met to discuss the possibility of settling the case. Shortly before the settlement conference, the Department’s counsel called a Roche representative, Betty Bennett, and informed her that Behring had requested a meeting to attempt to resolve the protest. He was unable to make contact with an Abbott representative. No one from Roche attended the meeting. The Department did not issue any formal written notice that it intended to settle the case with Behring. The Department did not know prior to the meeting what the parties would discuss. The Department did not attend the meeting expecting to “negotiate a contract.” At the meeting, Behring initially took the position that the Department should award the contract to Behring at $.90 per test and not seek further competitive bids. The Department took the position that the contract should be subject to additional competitive bidding to determine what the result would be with more than one competitive bid. After further discussion, Behring offered to lower its bid price. The Department’s representatives left the room to discuss the offer. Upon their return, Department representatives made Behring a lower counteroffer. Behring and the Department eventually arrived at an oral settlement under which the Department would award the contract to Behring at a price of $.77 per test and Behring would dismiss its protest. The Department based its decision to settle the bid protest with Behring on the following: (a) the risk of losing the bid protest and being required to pay Behring $.90 per test; (b) the desire not to further extend the existing contract at the current price of $1.07 per test; (c) the risk that a third attempt to solicit competitive bids would result in another protest and further delay; (d) the fact that Behring had submitted responsive bids to the two previous solicitations; (e) the assumption that subsequent bids by Roche and Abbott would be higher when they included the omitted items that caused their rejection. There is no persuasive evidence to indicate that the Department’s reasons for settling Behring’s bid protest were pretextual or otherwise invalid. The Department correctly concluded that it might have to pay Behring $.90 per test if it lost the bid protest regardless of the applicable standard of proof in that proceeding. The Department also was justified in assuming that Roche’s bid price would be higher when it included the previously omitted printers. For these and other reasons set forth above in the Findings of Fact, the Department’s decision to settle the case by negotiating a lower contract price with Behring was in the best interest of the state of Florida. On October 23, 1996 the Administrative Law Judge in Case No. 96-4475BID entered an order closing the file of the Division of Administrative Hearings and relinquishing jurisdiction to the Department. The Department did not issue a Final Order setting forth the final disposition of the case. By letter dated October 30, 1996 the Department informed Roche and Abbott that it had negotiated a satisfactory contract with Behring pursuant to Rule 60A-1.018(1)(b), Florida Administrative Code. This letter advised Roche that the Department intended to award the contract to Behring. In the letter, the Department gave Roche the opportunity to request a hearing pursuant to Chapter 120, Florida Statutes, to protest the intended agency action. By letter dated November 8, 1996, Roche protested the notice of intended award to Behring. Without objection, Roche submitted an amended petition on December 10, 1996. Behring filed a petition for leave to intervene on November 27, 1996. An order dated December 11, 1996 granted that motion.

Recommendation Based on the foregoing Findings of Facts and Conclusions of Law, it is RECOMMENDED that the Department of Corrections enter a Final Order awarding the contract for ITB No. 96-DC-6847R to Behring Diagnostic, Inc., and dismissing the protest of Roche Diagnostic Systems. DONE and ENTERED this 12th day of February, 1997, in Tallahassee, Leon County, Florida. SUZANNE F. HOOD Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (904) 488-9675 SUNCOM 278-9675 Fax Filing (904) 921-6847 Filed with the Clerk of the Division of Administrative Hearings this 12th day of February, 1997.

Florida Laws (3) 120.569120.57287.057
# 3
SPEC, INC. vs DEPARTMENT OF TRANSPORTATION, 01-001169BID (2001)
Division of Administrative Hearings, Florida Filed:Miami, Florida Mar. 26, 2001 Number: 01-001169BID Latest Update: Jul. 05, 2001

The Issue Whether Petitioner's protest challenging the Department of Transportation's Notice of Intent to Award Contract No. E-6A14, FIN Project No. 251999-1-32-01/251999-1-52-01, to A-1 Duran Roofing, Inc., should be sustained in whole or in part.

Findings Of Fact Based upon the evidence adduced at hearing, and the record as a whole, the following findings of fact are made to supplement the stipulations of fact set forth in the parties' Joint Pre-Hearing Stipulation: 3/ The District VI Warehouse. The District VI (District) warehouse is used to store archived records, paper supplies, and surplus equipment. In addition, it houses the District's divers and their gear. The District Warehouse Roof Since at least the time of the first solicitation, the District warehouse roof has had a ponding problem and been in disrepair. The condition of the roof has deteriorated to such an extent that there is now an urgent need to replace it. The current roof has five overflow drains or scuppers. The Department has determined that additional scuppers are necessary to provide adequate drainage. The List of Interested and Prequalified Contractors When the District warehouse roof replacement project was originally advertised in 1997, 25 contractors, including Petitioner, A-1, Zurqui, Grace, ART, and Southern Coast Enterprises, requested that the Department send them information about the project. The Department compiled a list containing these 25 contractors' names, addresses, and telephone and fax numbers. The Department subsequently prequalified each of these 25 contractors. Petitioner Pedro Glaria is Petitioner's president. He is now, and has been since 1981, licensed in the State of Florida as both a general contractor and a professional engineer. Petitioner currently has two contracts with the Department, the dollar values of which are $140,000.00 and $110.00.00. Both contracts were awarded during the summer of 2000. They each require Petitioner to provide "roadside mowing" and "roadside litter pickup" services. Since its incorporation in 1989, Petitioner has had a total of 10 to 12 contracts with the Department, at least one of which involved roofing work. At no time has the Department indicated to Mr. Glaria that it has been dissatisfied with Petitioner's work. The Third Solicitation In the third solicitation, as in the first two solicitations, the District warehouse roof replacement project was advertised as a design-build project (involving both design and construction services). The Notice of Informal Bid (No. 6012DS) that the Department used to solicit bids contained the following "work description," "evaluation criteria," and "project information": Work Description Sealed written bids are requested from licensed roofing contractors, general building contractors, professional architectural engineers or professional consultant services for the purpose of a design-build project consisting of roof replacement for the District warehouse building located at the District office complex, 1000 Northwest 111th Avenue, Miami, Florida. The bidder shall provide all labor, materials, supplies, travel, consultant inspection services, shop drawing reviews to design, and furnish plans and specifications necessary to perform all work required for this project. Evaluation Criteria The Florida Department of Transportation (FDOT) will evaluate the technical bid along with the price bid at the same time. The Department may award this contract to the firm whose proposal meets the needs of the Department as outlined in the technical bid criteria, and to the responsible, responsive bidder submitting the lowest total bid. Technical Bid Will Consist of the Following Experience and qualifications of personnel Plans and specifications. 3). Design Warranty Contract time Price Bid 3). Certified Minority Business Enterprise (CMBE) Participation . . . Project Information ESTIMATED BUDGET AMOUNT: N/A With respect to a protest of the specifications contained in an Invitation to Bid or in a Request for Proposals, the Notice of Protest shall be filed in writing within seventy two (72) hours after the receipt of notice of the project plans and specifications or intended project plans and specifications in an Invitation to Bid or Request for Proposals." A formal written protest stating with particularity the facts and law upon which the protest is based and in substantially the same form as a petition in accordance with Rule 60-4.012, F.A.C., shall be filed within ten (10) days after filing of the notice of protest. The ten (10) day period includes Saturdays, Sundays and Legal Holidays; provided, however, if the last day is a Saturday, Sunday or Legal Holiday the period shall run until the end of the next day which is neither a Saturday, Sunday or Legal Holiday. Any person who files an action protesting an award shall post with the Department, at the time of filing the formal written protest, a bond payable to the Department in the amount equal to one percent (1%) of the Department's estimate of the contract amount for the purchase requested or five thousand dollars ($5,000.00), whichever is less, which bond shall be conditioned upon the payment of all costs which may be adjudged against him in the Administrative hearing in which the action is brought and in any subsequent Appellate Court Proceedings. In lieu of a bond, the Department may accept a cashier's check or money order in the amount of the bond. The protest must be filed with The Department of Transportation, Clerk of Agency Proceedings, 605 Suwannee Street, Tallahassee, Florida 32399-0450 THE DEPARTMENT RESERVES THE RIGHT TO REJECT ANY OR ALL PROPOSALS RECEIVED. Exhibit "A" (Attachment V) to the Notice of Informal Bid was the "Scope of Services for Design Build of Replacement Roof at the District Warehouse Building," Section 2.5(a) of which provided as follows: Bidder shall furnish plans and specifications that comply with the South Florida Building Code, Permits Office of the Department of Management Services, and the State Fire Marshall's Office, including but not limited to the following: The design of the roof shall provide for the installation of overflow drains or scuppers in addition to the existing scuppers to prevent an accumulation of water. Petitioner's technical bid, which was prepared by Mr. Glaria, contained a roof design that did not provide for the installation of the additional scuppers required by Section 2.5(a) of Exhibit "A." In Mr. Glaria's professional opinion, these additional scuppers were unnecessary for the design of the roof to comply with the South Florida Building Code. (Petitioner, however, did not file a protest challenging the bid specifications.) By not incorporating the additional scuppers in its design of the roof, Petitioner was able to submit a price bid lower than it could have offered had its design been in compliance with the requirements of Section 2.5(a) of Exhibit "A." All three members of the Department's Technical Review and Awards Committee found Petitioner's technical bid to be non- responsive because it deviated from the requirements of Section 2.5(a) of Exhibit "A.". Had the Department not rejected the Department's technical bid on the grounds that it was non-responsive, Petitioner would have had an unfair competitive advantage over those bidders whose design of the roof included the additional scuppers required by Section 2.5(a) of Exhibit "A." Petitioner's Formal Protest of the Department's announced intention to contract with A-1 contained the following argument concerning the Department's determination that Petitioner's technical bid did not "comply with design criteria for overflow scuppers": FDOT's Technical Panel determined that SPEC failed to comply with the design criteria for overflow scuppers because SPEC did not provide for additional scuppers. . . . The roof already contains five scuppers. As engineer of this design- build project, SPEC determined that additional scuppers were not necessary for proper drainage of the roof. Rather, the roof only necessitated the installation of crickets between the existing scuppers to facilitate drainage of water between the scuppers. The drawing submitted with SPEC's bid reflects the location of the existing scuppers and the use of the crickets to drain any water on the roof. A-1's drawing reflects the use of additional scuppers, but the location of these additional scuppers cannot assist water drainage as the scuppers are located above the crickets, and therefore above roof level, thereby losing any effectiveness. . . . The additional scuppers provided by A-1 will not prevent the accumulation of water as required by section 2.5 and will only create unnecessary expenditure for FDOT. SPEC's design for the drainage of water from the roof is superior to that of A-1, complies with the requirements of the bidding documents and does not require unnecessary expenditure of funds. Accordingly, SPEC should be awarded the project. The Department's December 17, 1998, Notice of Intent Not to Award (Re: Informal Bid No. 6012DS) stated, in pertinent part, as follows: It is the intent of the Department of Transportation to not award the above Contract. This contract will be re- advertised at a later date. . . . ALL BIDS HAVE BEEN REJECTED On January 4, 1999, Petitioner's attorney, Alejandro Espino, Esquire, sent a letter to Department Assistant General Counsel Brian McGrail, which read as follows: This letter confirms our telephone conversation today wherein you stated that the Florida Department of Transportation ("FDOT") rejected all bids on the above referenced project because FDOT intends to rewrite the specification for the mansard roof wood replacement and because FDOT has no available funding for the project. However, you stated that FDOT will not provide a written explanation to SPEC Incorporated or any other bidder for the rejection of the bids for the project. If you believe that the above is not an accurate summary of our conversation, please contact me at your earliest convenience. Best regards. Mr. McGrail responded to Mr. Espino by letter dated January 4, 1999, which read as follows: I am in receipt of your letter this morning regarding our telephone conversation concerning the captioned matter. In response to your rendition of our conversation, I must clarify that I expressed my understanding that the specifications for the project will be reviewed, which may include the issues raised in the protest about the bid specifications, before any further action will be taken by the Department. However, the Department's decision to reject all bids is due to the unavailability of funding for this contract at the present time. I cannot speak to the future of the project with any degree of certainty, nor represent any to you or your client. This is a matter strictly for District VI to decide, and I am not involved in that decision making process. The Department will defend the decision to reject all bids based on the lack of available funding. I refer your attention to Attachment II of Informal Bid #6012DS, Contractual Obligation, Section 1.10 through 1.13. In particular, Cancellation Privileges, regarding the Department's obligations under the Notice of Informal Bid and subsequent agreement shall be subject to and contingent upon the availability of monies appropriated for this contract. Additionally, I am sure that you are aware that the bid documents clearly and repeatedly state the Department's reservation of rights to reject any and all bids for this bid letting. Based on the foregoing, it is clear that the Department's action in rejecting all bids is appropriate under Florida law, if not required, due to the lack of available funds at the present time. If Spec Inc. intends to p[rotest] the Department's decision to reject all bids, I feel it is my responsibility to advise you that the Department will seek any and all costs and attorney fees to which it may be entitled against the protest bond filed in this case. If however, Spec Inc. decides to withdraw the current protests against the intent to award filed on September 28, 1998, and the rejection of all bids filed on December 22, 1998, the Department will agree to return the protest bond in full. After you have had an opportunity to review this matter with your client, please advise at your earliest convenience how Spec Inc., wishes to proceed. Thank you for your cooperation in this matter. I look forward to a prompt response, as the hearing date is approaching rapidly. Mr. Glaria "realized that [Petitioner was] going to have a hard time [in its bid protest] to overcome the issue of lack of funding." In addition, he had the "hope that [Petitioner] would [have the opportunity to] bid the project again for the fourth time." Accordingly, he authorized Mr. Espino to file, on behalf of Petitioner, the following Notice of Voluntary of Dismissal of Formal Protest, dated January 11, 1999: Petitioner, SPEC Incorporated, hereby withdraws its formal protest, dated October 18, 1998, of the Florida Department of Transportation's notice of intent to award Informal Bid No. 6012DS, Financial Project Nos. 2519993201/25199915201, Dade County, to A-1 Duran Roofing, Inc. Upon agreement of counsel for the parties, SPEC Incorporated's bid protest bond will be returned to it. Mr. Espino, in addition, sent the following letter, dated January 11, 1999, to Mr. McGrail: Based on the Florida Department of Transportation's ("FDOT") representation that it rejected all bids for Informal Bid No. 6012DS, Financial Project Nos. 2519993201/25199915201, Dade County, because of the unavailability of funds and because of necessary amendments to the project specifications, SPEC Incorporated hereby withdraws its formal protest of FDOT's notice of intent to reject all bids. As we discussed earlier, FDOT will return SPEC Incorporated's protest bond thirty days after FDOT files . . . the final order in this matter. If you have any questions or comments, please do not hesitate to contact me. Fourth Solicitation The Project is funded through appropriations made by the Legislature in the fixed capital outlay category. 4/ Fixed capital outlay funds are subject to reversion if not obligated (through the execution of a contact or the issuance of a notice of intent to award a contract) within 19 months of their appropriation by the Legislature. In mid-January of 2001, Brenda Garner, the manager of the Department's Fixed Capital Outlay Program, advised Ms. Lyons that, if not obligated by February 1, 2001, a portion of the funds ($45,000.00) appropriated for the Project would revert. Ms. Lyons (who had not been involved, as the District's contract administrator, in the first three solicitations) quickly proceeded (in a day's time) to assemble the documents needed to solicit bids for the Project. These documents included detailed plans and specifications that the District's senior structural engineer and senior project manager had prepared, at Ms. Lyons' request, following the third solicitation, as well as "boilerplate" that the Department uses for non-design-build fixed capital outlay projects like the Project. Ms. Lyons determined that it was unnecessary to advertise for bids and that the Department only needed to solicit bids from three contractors. She selected these three contractors from the list of interested and prequalified contractors that the Department had compiled in the first solicitation. As Ms. Lyons was aware, each of the three contractors she selected (A-1, Zurqui, and Grace) was a Certified Minority Business Enterprise (MBE). She intentionally selected MBE contractors because the District was "trying to meet an MBE goal." Ms. Lyons had some professional familiarity with the three MBE contractors she selected. A-1 had just completed another roofing project for the District, and Zurqui and Grace were performing construction work at the District office complex. Ms. Lyons' decision to not include Petitioner among the three contractors asked to submit bids was not made in bad faith. Inasmuch as the Department was "in a big hurry to get that project done" she did not ask more than three contractors to submit bids. Ms. Lyons required each of the three contractors to first provide proof that it was a licensed general contractor qualified to work on the Project. After receiving such proof, Ms. Lyons then asked the three contractors to bid on the Project. A-1, Zurqui, and Grace submitted their bids on January 25, 2001. The Technical Review and Awards Committee met on January 26, 2001, to review the bids. All three bids were deemed to be responsive. A-1's bid of $58,300.00 was the lowest of the three bids. Neither Zurqui nor Grace protested the Department's proposed decision, announced in its January 26, 2001, Notice of Intent to Award, to award the contract for the Project to A-1. Only Petitioner, which had not been invited to submit a bid and had first learned of the fourth solicitation when Mr. Glaria saw the Notice of Intent to Award while at the District office complex on January 26, 2001, filed a protest.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is hereby RECOMMENDED that the Department issue a final order rejecting in its entirety Petitioner's protest of the Department's announced intention to award Contract E-6A14 to A-1. DONE AND ENTERED this 5th day of June, 2001, in Tallahassee, Leon County, Florida. STUART M. LERNER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 5th day of June, 2001.

Florida Laws (7) 120.57255.0525255.29287.057337.11415.111415.1111 Florida Administrative Code (7) 28-110.00328-110.00460A-1.00160D-5.00360D-5.00760D-5.007360D-5.008
# 4
BUY THE SQUARE YARD, INC. vs PALM BEACH COUNTY SCHOOL BOARD, 93-002672BID (1993)
Division of Administrative Hearings, Florida Filed:West Palm Beach, Florida May 17, 1993 Number: 93-002672BID Latest Update: Mar. 31, 1994

Findings Of Fact The Palm Beach County School Board (Respondent) issued an invitation to bid (ITB) on February 16, 1993, requesting bids for the removal, preparation, and installation of carpet-glue down on project SB93C-216T. The ITB provided that all bids were to be submitted by March 31, 1993, at 2:00 p.m., at which time all bids were to be publicly opened. Pertinent sections of the ITB to the case at hand include a section entitled "Invitation To Bid" which provides in pertinent part: AWARDS: In the best interest of the School Board, the Board reserves the right to reject any and all bids and to waive any irregularity in bids received; to accept any item or group of items unless qualified by bidder; to acquire additional quantities at prices quoted on this invitation unless additional quantities are not acceptable, in which case the bid sheets must be noted "BID IS FOR SPECIFIED QUANTITY ONLY." All awards made as a result of this bid shall conform to applicable Florida Statutes. Another section entitled "General Conditions, Instructions and Information for Bidders" provides in pertinent part: 26. Any and all Special Conditions that may vary from these General Conditions shall have precedence. The section entitled "Special Conditions" provides in pertinent part: C. AWARD: Bid will be awarded to the lowest and best bidder meeting specifications, terms and conditions . . . The School Board shall elect to award to a primary and a secondary vendor . . . . * * * N. CONTRACTOR QUALIFICATIONS: The contractor must have at least three years of verifiable experience in the floor covering contracting business. The contractor must have in force the required occupational licenses from Palm Beach County and it's municipalities. All documentation of the above requirements must be submitted with the proposed bid by each bidding contractor. The contractor shall not sub-contract any portion of their work, outlined in this contract, to any person(s) or company, without advance written permission from the Carpentry Supervisor of the Department of Maintenance & Plant Operations. Another section of the ITB entitled "Additional Information" provides in pertinent part: Additional information will not be a determining part of the award of this bid except in the instance where the per square yard prices are too close to determine a clear awardee. In that instance we will look at the optional items in this section as the determining factor. (This usage is also based upon all other factors being equal.) . . . Cost of heavy patching. $ per sq. ft. . . . Cost of heavy patching. $ per sq. ft. . . . By March 31, 1993, eight bids were received. However, only seven bids were considered. Respondent's Department of Contracting & Procurement reviewed the bids. On April 12, 1993, the Department of Contracting & Procurement (Department) posted the bid tabulations, which showed, inter alia, that the apparent lowest bidder was Carpetech at $28,029.61, that the apparent second lowest bidder was Buy the Square Yard (Petitioner) at $32,107.32, and that the apparent highest bidder was Acousti Engineering of Florida (Intervenor). Additionally, the recommendation was that the bid be awarded to the "lowest and best bidder meeting specifications, terms, and conditions" with Carpetech being the "Primary" bidder and Petitioner being the "Secondary" bidder. Moreover, the bid tabulation sheet noted that the "price" of each bid was determined by using a "hypothetical" that was typical of a School Board project. This was the first time that the bidders were aware of a hypothetical being used. Respondent had not used a hypothetical in past bids for this type of work, and it was not included in the bid specifications At first, after the bids were opened, Respondent's Department used the base bid, which excluded any alternate work, to determine the apparent lowest bidder. The calculation showed Intervenor as the apparent lowest bidder at $11.03 sq. yd. and Petitioner as the apparent second lowest bidder at $11.08 sq. yd. Carpetech's base bid was $11.295 sq. yd. A discussion ensued as to whether the bids were "too close"; but, there was no consensus as to the meaning of "too close." However, the Department determined that, taking into consideration the alternate work which would have to be done, Intervenor was not the best bidder. The Department first considered recommending the rejection of all bids and readvertising, but decided upon using a hypothetical which included the base bid and the alternates in the calculations. As a result of using the hypothetical, Carpetech, not Intervenor, was the apparent lowest bidder. However, Carpetech, unlike any other bidder, changed one of the specifications in its bid from the "cost of heavy patching" to the "cost of light patching." Respondent admits that a clerical error had occurred and that particular specification should have been "light" patching, instead of "heavy" patching. Also, Carpetech failed to submit an occupational license with its bid. However, subsequent to the bid opening, Carpetech submitted an occupational license. Like Carpetech, Intervenor also failed to submit an occupational license with its bid. 2/ To the contrary, Petitioner submitted an occupational license with its bid. The occupational license forbade Petitioner to have employees at its location but allowed it to hire outside employees, which meant that it could hire contract labor to perform under the contract of the bid. 3/ Out of the three bidders--Carpetech, Petitioner and Intervenor--only Petitioner is a minority owned business. Initially, when Petitioner began its business in December 1991, it was owned by a minority female and a minority male. Subsequently, for financial purposes, the minority female became the sole shareholder/owner and the minority male became the business consultant (consultant), receiving consulting fees. On or about March 24, 1992, Petitioner was certified as a Minority Business Enterprise (MBE) by Palm Beach County, and on or about March 19, 1992, it was certified as a MBE by Respondent, with the certification effective from May 1992 to May 1993. Petitioner became incorporated in or around April 1992 and again in July 1992 when the minority female became the sole owner. Prior to Petitioner's formation, its consultant had his own flooring business (carpet and tile sales and insulation) for several years. The prior business had financial difficulties which resulted in court judgements against it. Petitioner's sole owner was never involved in the consultant's prior business. She provides Petitioner's financial security, and there have been no court judgments against Petitioner. Respondent's Department was familiar with flooring work of Petitioner's consultant before he became associated with Petitioner. He had performed flooring work for Respondent in the past, which was very satisfied with his work. The Department was not aware of the court judgements against the prior business of Petitioner's consultant. However, even if it was, the judgments would not have had a negative effect on Petitioner in the award process of the current contract. On or about April 14, 1993, Intervenor filed its written protest, which was timely. On or about April 22, 1993, Petitioner filed its written protest, which was timely. On April 28, 1993, Respondent held an informal meeting on the written protests. On May 3, 1993, Respondent's counsel issued its recommendation on the protests, which was to "reject all bids and rebid with new terms and conditions and specifications" in order for all bidders to be given "a fair playing field."

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Palm Beach County School Board enter its final order rejecting all bids on project SB93C-216T and readvertise. DONE AND ENTERED in Tallahassee, Leon County, Florida, this 2nd day of December 1993. ERROL H. POWELL Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 2nd day of December 1993.

Florida Laws (2) 120.53120.57
# 5
M K MECHANICAL, INC. vs PALM BEACH COMMUNITY COLLEGE, 93-000933BID (1993)
Division of Administrative Hearings, Florida Filed:West Palm Beach, Florida Feb. 22, 1993 Number: 93-000933BID Latest Update: Aug. 19, 1993

Findings Of Fact Facts based on stipulation These proceedings concern Petitioner's Bid Protest in connection with that certain project known as Chiller Installation, Glades Campus, Project NO. 9237, PBCC No. 6812. Petitioner has taken all steps necessary to perfect its bid protest in a timely manner and has standing to bring this bid protest. Petitioner and Respondent met and were unsuccessful in an attempt to resolve the bid protest as required by Section 120.53(5), Florida Statutes. M. K. Mechanical, Inc., a Florida corporation, is a State of Florida Certified Mechanical Contractor and as such was a "Qualified Bidder." The original specifications for the subject project contained few electrical specifications and were silent as to how an electrical contractor was to be licensed. The bid was due on Tuesday, January 12, 1993, at 2:00 p.m. On Friday, January 8, 1993, at 3:42 p.m., via facsimile transmission, M. K. Mechanical, Inc., received supplementary electrical specifications, thirty (30) pages in length. Contained in these supplementary specifications, for the first time, was a requirement that the electrical subcontractor had to be "locally" licensed. M. K. Mechanical, Inc.'s, primary place of business is in Edgewater, Volusia County, Florida. M. K. Mechanical, Inc.'s, submitted bid was proper in all respects other than an electrical subcontractor's name was not given, instead "to be determined" was inserted. M. K. Mechanical, Inc., submitted the lowest bid. Electrical subcontractor is a "major" subcontractor on this project. The sole basis for the decision by Respondent that Petitioner's bid was "non-responsive" was the failure to list an electrical subcontractor. Additional facts regarding bid specifications The bid specifications include the requirement that bidders list all "major subcontractors" and that the category of "major subcontractors" includes electrical subcontractors. Section 5.2.1 of the Contract Documents within the Bid Specifications provides as follows: Unless otherwise required by the Contract Documents or the Bidding Documents the Contractor at the bid opening shall furnish to the Owner and Architect Form 00420, a written list of the major Subcontractors; Site Utilities, Structural Concrete, Masonry, Structural Steel & Steel Joists, Plumbing, HVAC, Electrical and Roofing, who he proposes to use on this work.

Recommendation On the basis of all the foregoing, it is RECOMMENDED that Palm Beach Community College enter a Final Order in this case denying the protest of the Petitioner, M. K. Mechanical, Inc., and awarding the contract in Project No. 9237, PBCC No. 6812 to the Intervenor, Hill York Corporation. DONE AND ENTERED this 15th day of July, 1993, in Tallahassee, Leon County, Florida. MICHAEL M. PARRISH Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 15th day of July, 1993. COPIES FURNISHED: Sid C. Peterson, Jr., Esquire DeLoach & Peterson, P.A. Post Office Box 428 New Smyrna Beach, Florida 33170 James M. Adams, Esquire Gibson & Adams, P.A. Post Office Box 1629 West Palm Beach, Florida 33402 Herbert L. Dell, President Hill York Corporation Post Office Box 350155 Fort Lauderdale, Florida 33335 The District Board of Trustees Palm Beach Community College 4200 Congress Avenue Administration Building Lake Worth, Florida 33461 Attention: Mr. Dick Jones

Florida Laws (2) 120.53255.0515
# 6
AMEC CIVIL, LLC vs DEPARTMENT OF TRANSPORTATION, 04-003169BID (2004)
Division of Administrative Hearings, Florida Filed:Mango, Florida Sep. 03, 2004 Number: 04-003169BID Latest Update: Feb. 22, 2005

The Issue Whether the Department of Transportation’s decision to reject all bids for Financial Project No. 209278-1-52-01 (J. Turner Butler Blvd.) a major interchange in Duval County, Florida, was exercised illegally, arbitrarily, dishonestly or fraudulently.

Findings Of Fact On April 1, 2004, the Department of Transportation advertised its Bid Solicitation Notice (BSN), for the JTB Project. H. W. Lochner, Inc. (Lochner) designed the JTB Project. Petitioner, Superior Construction, and Archer Western Contractors, LTD, submitted bids on May 26, 2004. Petitioner had the apparent low bid, and Superior had the second apparent low bid. On or about May 27, 2004, Robert Burleson, President of the Florida Transportation Builders Association (“FTBA”), contacted the State Construction Engineer, Ananth Prasad, P.E., and alerted him to potential issues regarding MOT phasing. (T. p. 876, lines 18-24; p. 880, lines 14, 15). Richard Ayers, of Superior Construction, called the Jacksonville Urban Office of the Department of Transportation, District 2, alerting the District to the concerns regarding the maintenance of traffic issues. Ayers had reviewed the bid and plans generally to assess its bid in light of the Petitioner's bid, and had discovered in the process MOT issues that he believed would add substantially to the costs and time required to construct the project. As a result of these calls, Robert Hansgen, P.E., District 2 Resident Engineer, was directed by someone within the Department to review the MOT plans. On June 1, 2004, Mr. Hansgen forwarded to Henry Haggerty and Al Moyle a memorandum outlining seven areas of MOT concern relating to the "constructability" and safety of the JTB project. On June 1, 2004, Hansgen's memorandum was forwarded to Mohammed Majboor, P.E., Design Consultant Engineer for the Department, who forwarded the memo to Lochner. Lochner reviewed its plans in light of the Hansgen memorandum and forwarded its response on June 3, 2004, to Hansgen, who reviewed the responses and added his comments. He e-mailed Henry Haggarty seven concerns he had with the MOT plans. On June 2, 2004, Allen Moyle, Jacksonville Construction Engineer, received Hansgen's and Lochner's responses regarding the MOT plans and determined that the project plans needed revisions because of safety issues. Moyle concluded that all the bids needed to be rejected in light of the MOT revisions. He transmitted a request to Cathy Thomas at the Department's headquarters to arrange a meeting with Lochner to commence revision of the plans at the earliest possible date. On June 8, 2004, Hansgen briefed the District 2 Secretary, Schroeder, and other District 2 staff members on the issues regarding maintenance of traffic issues based on his memo, a marked-up copy of the MOT sheets, and pictures. Rejection of all bids was discussed at this meeting. Mr. Hansgen testified at the formal hearing concerning his findings and his actions with the aid of the original memorandum and Respondent's Exhibits 1 and 2. Mr. Hansgen's concerns were about safety issues and included the reduction of traffic lane widths in areas to 11 feet where barrier walls would be erected on both the inside and outside medians where traffic would be traveling at 55 miles per hour. Another concern was the length of these lanes that would be restricted by concrete barriers. These barriers prevented easy access of emergency vehicles in these areas, which presented a significant hazard at this interchange, which accesses a major hospital complex. Mr. Hansgen’s also identified an inconsistency regarding where the contractor could work in an area close to the barrier wall; a portion of the roadway where a cross slope or tilting of the traveling lane created dangerous vehicle control issues; and plans to widen a portion of the roadway while vehicles traveled on the same portion of roadway which would require further narrowing of lanes. Because the State of Florida has one of the highest fatality records in the nation in work zones, the Department is very concerned about this issue. After the meeting on June 2, 2004, the Jacksonville Urban Office for District 2 recommended rejection to DOT in Tallahassee of all bids based on the need to “clarify uncertainties within the phasing of the maintenance of traffic (MOT) plans.” The recommendation of District 2 was reviewed by the Technical Review Committee, which is comprised of six voting members. On June 9, 2004, the Technical Review Committee recommended rejection of all bids on the JTB Project to the Contract Awards Committee based upon MOT safety issues. The Contracts Award Committee, composed of three voting members, met on June 15, 2004, to consider the recommendations regarding the JTB Project of the Technical Review Committee and District 2. The Contracts Award Committee concurred with the recommendations of the Technical Review Committee and District 2 and rejected all bids based upon MOT safety issues. The Department posted its notice of intent to reject all bids on June 17, 2004. The Petitioner filed a Notice of Intent to Protest the Department’s rejection of all bids with a Formal Written Protest, filed on July 1, 2004, including an appropriate protest bond. The Department’s engineers met with engineers from H.W. Lochner, Inc., to discuss the issues of concern raised in the Hansgen memorandum. The Department commissioned Lochner to revise the plans to enhance the safety features for MOT, and certain other enhancements. Lochner and the Department entered into Supplement Agreement #13 that included both the requested enhancements and the changes to accommodate the concerns referenced in the Hansgen Memorandum. Richard Kelly testified regarding “animus,” and “dislike” displayed by employees of the Department. He pointed to past decisions and actions of Department employees as proof of “dislike” and “animus." These included a Letter of Concern to the Petitioner, on April 16, 2004, from the Department outlining five areas the Department had identified as important in making a determination on the pre-qualification of the Petitioner for bidding on Department contracts for the 2004-2005 fiscal year. Also mentioned were disputed issues between the Department and the Petitioner arising during construction of the I-95/I295 Interchange Project, including Jacksonville ordinances on noise ordinance, and trees and deficiency letters from the Department to AMEC Civil. In addition, the disqualification of Morse Diesel, LLC, as the Petitioner was formerly named, from bidding on construction contracts with the State of Florida, and in 2002, the revocation of the pre-qualification of the Petitioner to bid on DOT projects were described. Ananth Prasad, P.E., who was identified by the Petitioner's witnesses as a primary source to opposition to the Petitioner, testified that he did not hold the position of State Construction Engineer in 2000, and was not involved in the decision to deny pre-qualification of Morse Diesel. Mr. Prasad also was not involved with the initial decision to revoke the pre-qualification of AMEC in 2002. Mr. Prasad does not personally hold a position on the Technical Review Committee. Mr. Prasad did not vote on the decision to recommend rejection of all bids on the JTB project. The decision to reject all bids for the JTB Project was made by the Contracts Award Committee based on recommendations from the Technical Review Committee, and District 2. The Department’s Contracts Award Committee exercised its statutory authority to reject all bids based on concerns regarding the MOT phasing.

Recommendation Based on the foregoing findings of fact and Conclusions of Law, it is Recommended that the Department of Transportation enter a final order dismissing Petitioner’s Formal Written Protest concerning the bid rejection for the project in this litigation. DONE AND ENTERED this 28th day of December, 2004, in Tallahassee, Leon County, Florida. S STEPHEN F. DEAN Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 28th day of December, 2004. COPIES FURNISHED: F. Alan Cummings, Esquire S. Elysha Luken, Esquire Smith, Currie & Hancock, LLP 1004 DeSoto Park Drive Post Office Box 589 Tallahassee, Florida 32302-0589 Mike Piscitelli, Esquire Vezina, Lawrence & Piscitelli, P.A. 305 East Las Olas Boulevard, Suite 1130 Fort Lauderdale, Florida 33301 Calvin C. Johnson, Esquire C. Denise Johnson, Esquire Department of Transportation 605 Suwannee Street Haydon Burns Building, Mail Station 58 Tallahassee, Florida 32399-0450 James C. Myers, Agency Clerk Department of Transportation Haydon Burns Building, Mail Station 58 605 Suwannee Street Tallahassee, Florida 32399-0450

Florida Laws (2) 120.57337.11
# 7
SPINELLA ENTERPRISES, INC. vs DEPARTMENT OF ENVIRONMENTAL PROTECTION, 08-003380BID (2008)
Division of Administrative Hearings, Florida Filed:Lauderdale Lakes, Florida Jul. 14, 2008 Number: 08-003380BID Latest Update: Nov. 04, 2008

The Issue The issue in this bid protest is whether Respondent acted arbitrarily when it decided to reject all of the bids it had received in response to a solicitation seeking bids on a contract for roof repairs.

Findings Of Fact On January 10, 2008, the Florida Department of Environmental Protection (the "Department" or "DEP") issued an Invitation to Bid (the "ITB"), the purpose of which was to solicit competitive bids from qualified contractors on a project whose scope of work envisioned repairs to the wind-damaged roofs of several buildings located on the grounds of the Hugh Taylor Birch State Park in Fort Lauderdale, Florida. Some of the buildings to be repaired were single-family residences. Work on these structures accordingly needed to conform to the requirements prescribed in the 2007 Manual of Hurricane Mitigation Retrofits for Existing Site-Built Single Family Residential Structures (the "Manual"), which the Florida Building Commission (the "Commission"), following an explicit legislative directive, see Section 553.844(3), Florida Statutes,1 recently had adopted, by incorporative reference, as a rule. See Fla. Admin. Code R. 9B-3.0475 (2007).2 The Rule had taken effect on November 14, 2007, giving the Manual's contents the same status and force as the Florida Building Code. Id. Just before the Department issued the ITB, the Commission had approved, at a meeting on January 8, 2008, a modified version of the Manual, which it called the 2007 Manual of Hurricane Mitigation Retrofits for Existing Site-Built Single Family Residential Structures, Version 2 (the "Revised Manual"). In consequence of the Commission's approval of the Revised Manual, the Florida Department of Community Affairs ("DCA") caused a Notice of Proposed Rule Development to be published on January 25, 2008, in the Florida Administrative Weekly. This official advertisement announced that the Commission intended to amend Rule 9B-3.0475, so that its incorporative reference would mention the Revision Manual instead of the Manual. See 34 Fla. Admin. W. 461-62 (Jan. 25, 2008).3 DCA caused a Notice of Proposed Rule respecting the intended revision of Rule 9B-3.0475 to be published on February 1, 2008, in the Florida Administrative Weekly. See 34 Fla. Admin. W. 605 (Feb. 1, 2008).4 On February 5, 2008, the Department issued Addendum No. 4 to the ITB (the "Addendum"). The Addendum provided in pertinent part as follows: Bidders shall bid the project as specified despite the recent change in Rule 9B-3.0475 relating to hurricane mitigation retrofits. Any additional water barrier will be accomplished by Change Order after award of the contract. (The foregoing provisions of the Addendum will be referred to hereinafter as the "Directive"). On February 12, 2008, the Department opened the bids it had received in response to the ITB. Ten (out of 12) of the bids submitted were deemed responsive. The bid of Petitioner Spinella Enterprises, Inc. ("Spinella") was one of the acceptable bids. On February 19, 2008, DEP posted notice of its intent to award a contract to the lowest bidder, namely Spinella, which had offered to perform the work for $94,150. The second lowest bidder was The Bookhardt Group ("Bookhardt"). Bookhardt timely protested the intended award, raising several objections, only one of which is relevant here. In its formal written protest, dated March 3, 2008, Bookhardt alleged that "[t]he new State of Florida law F.S. 553.844 was not part of the solicitation." On April 4, 2008, Rule 9B-3.0475, as amended to incorporate by reference the Revised Manual, took effect. See Fla. Admin. Code R. 9B-3.0475 (2008). On May 16, 2008, DEP posted notice of its intent to reject all bids received in response to the ITB. (Bookhardt's protest, which remained pending, had never been referred to DOAH for a formal hearing.) Spinella timely protested the Department's decision to reject all bids. In an email sent to Spinella on July 22, 2008, DEP's counsel explained the rationale behind the decision: The reason the Department rejected all bids follows. When the Department posted the notice of intent to award the contract to Spinella Enterprises, Inc., the second low bidder (Bookhardt Roofing) protested the intent to award. The second low bidder's basis for protesting the intended award was that Addendum 4 directed bidders to ignore certain rules of the Construction Industry Licensing Board [sic], which had become effective after the bid opening, which was not in accordance with the law. As a result, this may have caused confusion and the Department had no assurance that bidders were bidding the project correctly. In addition, the statement in Addendum 4 that the Department would add the required moisture barrier afterward by change order set up a situation where bidders had no idea how much the Department would be willing to pay for the change order. Further, the moisture barrier was not the only thing required by the new rules. Potential bidders may not have bid due to these uncertainties. The Department agreed with Bookhardt's assertions and rejected all bids . . . . Notwithstanding Spinella's protest, the Department issued a second invitation to bid on the project in question. As of the final hearing, the bids received in response to this second solicitation were scheduled to be opened on August 12, 2008. Ultimate Factual Determinations The Department's decision to reject all bids is premised, ultimately, on the notion that the Directive told prospective bidders to ignore an applicable rule in preparing their respective bids.5 If this were true, then the Directive could have been a source of potential confusion, as the Department argues, because a prudent bidder might reasonably hesitate to quote a price based on (possibly) legally deficient specifications. The Directive, however, did not instruct bidders to ignore an applicable, existing rule. Rather, under any reasonable interpretation, it instructed bidders to ignore a proposed rule and follow existing law. Such an instruction was neither confusing nor inappropriate. To be sure, the first sentence of the Directive——at least when read literally——misstated a fact. It did so by expressing an underlying assumption, i.e. that Rule 9B-3.0475 recently had been changed, which was incorrect. In fact, as of February 5, 2008, the Rule was exactly the same as it had always been. (It would remain that way for the next two months, until April 6, 2008).6 DEP's misstatement about the Rule might, conceivably, have confused a potential bidder, at least momentarily. But DEP did not factor the potential for such confusion into its decision to reject all bids, and no evidence of any confusion in this regard was offered at hearing.7 More important is that the unambiguous thrust of the Directive was to tell bidders to rely upon the "not recently changed" Rule 9B-3.0475, which could only have meant Florida Administrative Code Rule 9B-3.0475 (2007) as originally adopted, because that was the one and only version of the Rule which, to that point, had ever existed. Thus, even if the Department were operating under the mistaken belief, when it issued the Addendum, that Rule 9B-3.0475 recently had been amended; and even if, as a result, DEP thought it was telling prospective bidders to ignore an applicable, existing rule, DEP nevertheless made clear its intention that prospective bidders follow the original Rule 9B- 3.0475, which was in fact the operative Rule at the time, whether or not DEP knew it. Indeed, as any reasonable potential bidder knew or should have known at the time of the Addendum, (a) the Commission recently had approved the Revised Manual, but the contents thereof would not have the force and effect of law unless and until the Revised Manual were adopted as a rule, which had not yet happened; (b) the Commission had initiated rulemaking to amend Rule 9B-3.0475 so as to adopt the Revised Manual as a rule, but the process was pending, not complete; (c) Rule 9B-3.0475 had not been amended, ever; and, therefore, (d) the Manual still had the force and effect of law. See endnote 6. The Directive obviously could not alter or affect these objective facts. At bottom, then, a reasonable bidder, reviewing the Directive, would (or should) have concluded either (a) that the "recent change" which DEP had in mind was the Commission's approval of the Revised Manual (or the subsequent announcement of the proposed amendment to Rule 9B-3.0475) or (b) that DEP mistakenly believed the Rule had been changed, even though it had not been. Either way, a reasonable bidder would (or should) have known that the Department wanted bidders to prepare their respective bids based not on the Revised Manual, but the Manual. In other words, regardless of what DEP subjectively thought was the existing law, DEP clearly intended (and unambiguously expressed its intent) that bidders follow what was, in fact, existing law. This could not have confused a reasonable bidder because, absent an instruction to exceed the minimum required legal standards (which the Directive was not), a reasonable bidder would have followed existing law in preparing its bid, just as the Directive required. Once it is determined that the Directive did not, in fact, instruct bidders to ignore an applicable, existing law, but rather told them to rely upon the applicable, existing law (notwithstanding that such law might change in the foreseeable future), the logic underlying the Department's decision to reject all bids unravels. Simply put, there is no genuine basis in logic or fact for concluding that the Addendum caused confusion. The other grounds that DEP has put forward do not hold water either. Contrary to the Department's contention, the possibility that a Change Order would be necessary if an "additional water barrier" were required could not possibly have confused potential bidders or caused them to be uncertain about how much money the Department would be willing to pay for such extra work. This is because Article 27 of the Construction Contract prescribes the procedure for entering into a Change Order, and it specifies the method for determining the price of any extra work. See ITB at 102-05. The fact that the proposed amendment to Rule 9B-3.0475, if it were to be adopted and become applicable to the instant project, might require other additional work, besides a water barrier, likewise could not reasonably have caused potential bidders to refrain from bidding, for the same reason: The Construction Contract contains explicit provisions which deal with the contingency of extra work or changes in the work. Id. In sum, DEP's intended decision to reject all bids cannot be justified by any analysis that a reasonable person would use to reach a decision of similar importance. It is, therefore, arbitrary.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department enter a final order finding that its decision to reject all bids was arbitrary. Because the Department elected not to comply with the statutory directive to abate this procurement pending the outcome of Spinella's protest, with the result that the contract at issue possibly has been awarded already to another bidder; and because the choice of remedies for invalid procurement actions is ultimately within the agency's discretion, the undersigned declines to make a recommendation regarding the means by which DEP should rectify the harm to Spinella, but he urges that other appropriate relief be granted if Spinella cannot be awarded the contact. DONE AND ENTERED this 2nd day of October, 2008, in Tallahassee, Leon County, Florida. JOHN G. VAN LANINGHAM Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 2nd day of October, 2008.

Florida Laws (3) 120.569120.57553.844 Florida Administrative Code (2) 9B-3.0479B-3.0475
# 8
CONWAY CONSERVATION, INC. vs DEPARTMENT OF AGRICULTURE AND CONSUMER SERVICES, 94-002121BID (1994)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Apr. 22, 1994 Number: 94-002121BID Latest Update: Aug. 09, 1994

Findings Of Fact On February 25, 1994, DACS issued an Invitation to Bid ITB/DF-93/94-49 to obtain competitive bids for contractual services involving a biological assessment of approximately 44,334 acres of the Goethe State Forest in Levy County, Florida. The Invitation to Bid provided that the bids received would be opened at 2:30 p.m. on March 21, 1994. The Special Terms, Conditions and Specifications of the Invitation to Bid provided that references submitted by the bidder must be those of the bidder. The General Conditions of the Invitation to Bid provided that the Department may waive any minor irregularity or technicality in the bids received. Bids must be evaluated upon the information furnished with the bid. No other information is used. At the bid opening, Conway was the apparent low bidder at $0.71 per acre for a total of $31,477.14, and Environmental Services was the apparent second low bidder at $1.0438 per acre for a total of $46,275.66. ESP's bid was approximately 47 percent higher than Conway's bid. ESP's bid was responsive to the ITB and ESP is qualified to perform the work required under the ITB. Conway submitted three references with its bid. However, Conway's three references were for work previously performed by Ms. Duever as an individual or as an employee of another company. The references were not those of the bidder, Conway. Linda Duever, the sole officer and director of Conway Conservation, Inc., read the invitation to bid and was aware of the specific requirement for references of the bidder. Ms. Duever thought the Department and the Invitation to Bid emphasized the importance of similar work to that sought by the Department. She did not seek information about the reference requirements, even though she had some doubt about the references she was submitting, thinking she could supplement the bid later if necessary. Nor did she protest the specifications within the timeframes established by Chapter 120, Florida Statutes. Conway is a closely January 26, 1993. However, Conway Conservation, Inc., and Linda Duever are two separate and distinct entities. The evidence demonstrated that the references of the bidders were an important part of the information to consider in the award of this bid since the references indicated that the bidder had the expertise to perform the work required in the bid but also had the financial wherewithal to complete such work and hire the necessary personnel or subcontractors to successfully complete the work required in the Invitation to Bid. In this case, Petitioner's references demonstrated expertise in the areas of knowledge required to complete a biological survey. However, what the references did not show and could not show because they did not reflect business done by Conway, was the financial ability of Conway to adequately complete a biological survey. Such information was very important to the Department and was not a minor irregularity nor technicality which could, or should, have been waived by DACS. Given these facts Petitioner's bid was not responsive to the Invitation to Bid and the Department was correct in rejecting Petitioner's bid and awarding the project to ESP. Finally, Conway is not certified by the Department of Management Services as a minority business enterprise pursuant to Section 288.703(4), Florida Statutes, although the evidence demonstrated that Petitioner could easily be so certified. However, bidder's minority status, either certified or not certified, does not change the result in this case. Status as a Minority Business Enterprise was not a consideration in this bid award. Therefore, Minority Business Enterprise status, or lack thereof, did not and could not have had any impact on the outcome. Moreover, the Department has no authority to change the terms and conditions under which a bid is to be awarded after the bids are opened in order to grant more favorable treatment to a potential minority business.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that Respondent issue a Final Order in this case dismissing Petitioner's formal protest and awarding the contract for the Project to Environmental Services and Permitting, Inc. DONE AND ENTERED this 7th day of July, 1994, in Tallahassee, Florida. DIANE CLEAVINGER Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 7th day of July, 1994. APPENDIX TO RECOMMENDED ORDER, CASE NO. 94-2121BID The facts contained in paragraphs A, B, D, E, F, G, H, I, K, L, M, O, Q, R and S, of Respondent's Proposed Findings of Fact are adopted in substance insofar as material. The facts contained in paragraphs C, J, N and P of Petitioner's Proposed Findings of Fact were subordinate. The facts contained in paragraphs 1, 2, 4, 5, 8, 9, 10, 12, 13 and 14 of Petitioner's Proposed Findings of Fact are adopted in substance insofar as material. The facts contained in paragraphs 3, 6, 7, 11, 15, 19, 20 and 21 of Petitioner's Proposed Findings of Fact are subordinate. The facts contained in paragraphs 17 and 18 of Petitioner's Proposed Findings of Fact were not shown by the evidence. COPIES FURNISHED: Isadore Rommes Senior Attorney Legal Office 515 Mayo Building Tallahassee, FL 32399-0800 Kent A. Zaiser P. O. Box 6045 Tallahassee, FL 32314-6045 Richard Tritschler General Counsel The Capitol, PL-10 Tallahassee, FL 32399-0810 Honorable Bob Crawford Commissioner of Agriculture The Capitol, Plaza Level Tallahassee, FL 32399 John T. Lavia, Esquire Landers & Parsons, P.A. Post Office 271 Tallahassee, Florida 32302

Florida Laws (5) 120.53120.57287.012287.057288.703
# 9
ACE WASTE SERVICES, LLP vs BROWARD COUNTY SCHOOL BOARD, 12-000150BID (2012)
Division of Administrative Hearings, Florida Filed:Lauderdale Lakes, Florida Jan. 11, 2012 Number: 12-000150BID Latest Update: May 10, 2012

The Issue Whether in making a preliminary decision to award a contract for the subject services under Invitation to Bid No. 12-039T – Refuse Services (the ITB) Respondent School Board of Broward County, Florida (the School Board) acted contrary to a governing statute rule policy or project specification; and if so whether such misstep(s) was/were clearly erroneous, arbitrary or capricious, or contrary to competition. Specifically, Petitioner Ace Waste Services, LLC (Petitioner) challenges the determination that the bids submitted by the apparent low bidder, the apparent low second low bidder, and the apparent low third low bidder were responsive and responsible bids meeting the specifications contained in the ITB.

Findings Of Fact School Board Policy 3320 entitled "Purchasing Policies" is the agency's rule governing the purchasing of goods and services. On October 7, 2011, the School Board issued the ITB which was entitled "Refuse Services." On October 18, 2011, the School Board issued Addendum No. 1 to the ITB. The refuse services were to be provided to 58 district school sites, which were collectively referred to as Group 1. The Bidder Acknowledgement found at Section 1.0 of the ITB states in pertinent part as follows: I agree to complete and unconditional acceptance of this bid all appendices and contents of any Addenda released hereto; I agree to be bound to all specifications terms and conditions contained in this ITB . . .. I agree that this bid cannot be withdrawn within 90 days from due date. Section 3 of the ITB states as follows at General Condition 3(b): MISTAKES: Bidders are expected to examine the specifications delivery schedules bid prices and extensions and all instructions pertaining to supplies and services. Failure to do so will be at Bidder's risk. Section 3 of the ITB states as follows at General Condition 35: PROTESTING OF BID CONDITIONS/SPECIFICATIONS: Any person desiring to protest the conditions/specifications of this Bid/RFP or any Addenda subsequently released thereto shall file a notice of intent to protest in writing within 72 consecutive hours after electronic release of the competitive solicitation or Addendum and shall file a formal written protest with ten calendar days after the date the notice of protest was filed. Saturdays Sundays legal holidays or days during which the school district administration is closed shall be excluded in the computation of the 72 consecutive hours. If the tenth calendar day falls on a Saturday Sunday legal holiday or day during which the school district administration is closed the formal written protest must be received on or before 5:00 p.m. ET of the next calendar day that is not a Saturday Sunday legal holiday or days during which the school district administration is closed. Section 120.57(3)(b) Florida Statutes as currently enacted or as amended from time to time states that "The formal written protest shall state with particularity the facts and law upon which the protest is based." Failure to file a notice of protest or to file a formal written protest within the time prescribed by [section 120.57(3)(b)] or a failure to post the bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under School Board Policy 3320 and [chapter 120]. The failure to post the bond required by School Board Policy 3320 Part VI within the time prescribed by School Board Policy 3320 Part VI as currently enacted or as amended from time to time shall constitute a waiver of proceedings under School Board Policy 3320 and [chapter 120]. Notices of protest formal written protests and the bonds required by School Board Policy 3320 Part VI shall be filed at the office of the Director of Supply Management and Logistics 7720 West Oakland Park Boulevard, Suite 323 Sunrise, Florida 33351 (fax 754-321-0936). Fax filing will not be acceptable for the filing of bonds required by School Board Policy 3320 Part VI. Section 3 of the ITB states as follows at General Condition 36: POSTING OF BID RECOMMENDATIONS/TABULATIONS: Any person who files an action protesting an intended decision shall post with the School Board at the time of filing the formal written protest a bond payable to the School Board of Broward County Florida in an amount equal to one percent (1%) of the Board's estimate of the total volume of the contract. The School Board shall provide the estimated contract amount to the vendor within 72 hours excluding Saturdays Sundays legal holidays and other days during which the School Board administration is closed of receipt of notice of intent to protest. The estimated contract amount shall be established on the award recommendation as the "contract award amount." The estimated contract amount is not subject to protest pursuant to [section 120.57(3)]. The bond shall be conditioned upon the payment of all costs which may be adjudged against the protestant in an Administrative Hearing in which the action is brought and in any subsequent appellate court proceeding. In lieu of a bond the School Board may accept a cashier's check official bank check or money order in the amount of the bond. If after completion of the Administrative Hearing process and any appellate court proceedings the School Board prevails the School Board shall recover all costs and charges which shall be included in the Final Order or judgment including charges made by the Division of Administrative Hearings but excluding attorney's fees. Upon payment of such costs and charges by the protestant the bond shall be returned. If the protestant prevails then the protestant shall recover from the Board all costs and charges which shall be included in the Final Order or judgment excluding attorney's fees. Section 3 of the ITB states as follows at Special Condition 1: INTRODUCTION AND SCOPE: The School Board of Broward County Florida (hereinafter referred to as "SBBC") desires bids on REFUSE SERVICES for solid waste removal as specified herein. Prices quoted shall include pick up at various schools departments and centers within Broward County Florida. Section 4 of the ITB states as follows at Special Condition 3: AWARD: In order to meet the needs of SBBC Bid shall be awarded in its entirety to one primary and one alternate responsive and responsible Bidders meeting specifications terms and conditions. The lowest Awardee shall be considered the primary vendor and should receive the largest volume of work. Therefore it is necessary to bid on every item in the group and all items (1-58) in the group must meet specifications in order to have the bid considered for award. Unit prices must be stated in the space provided on the Bid Summary Sheet. SBBC reserves the right to procure services from the alternate Awardee if: the lowest Bidder cannot comply with service requirements or specifications; in cases of emergency; it is in the best interest of SBBC. After award of this bid any Awardee who violates any specification term or condition of this bid can be found in default of its contract have its contract canceled be subject to the payment of liquidated damages and be removed from the bid list and not be eligible to do business with this School Board for two years as described in General Conditions 22 and 55. Section 4 of the ITB states as follows at Special Condition 7: ADDING OR DELETING SITES: SBBC may during the term of the contract add or delete service wholly or in part at any SBBC location. When seeking to add a location SBBC shall request a quote from both Awardees. The lowest Bidder shall receive an award for the additional location. If additional service is requested for an existing site already receiving service the current service provider will be contacted to provide a new quote based on the pricing formula submitted in response to this ITB or a subsequent quote. Section 4 of the ITB states as follows at Special Condition 11: RECEPTACLES: The Awardee shall furnish receptacles in good repair. . . .The Awardee shall furnish any and all equipment materials supplies and all other labor and personnel necessary for the performance of its obligations under this contract. Design of all equipment is subject to the approval of the Manager Energy Conservation Utility Management or his designee and must be replaced upon notification without additional cost to SBBC. DESCRIPTION: All receptacles used for solid waste referenced in Group 1 on the Bid Summary Sheets and the Tamarac location listed in Section 5 Additional Information unless otherwise indicated shall be provided by the Awardee at no additional cost. Bin receptacles shall be provided for SBBC use in the cubic yard capacities as indicated on the Bid Summary Sheets. Receptacles shall be bin-type units steel or plastic lift-up lids NO SIDE DOORS unless specifically requested for 8 cu. yd. fitted for automatic loading on casters where necessary for chute operations. (Receptacles not on casters must have a 6" – 12" clearance from ground to bottom of bin for easy cleaning underneath.) TWO AND THREE YARD CONTAINERS: It will be necessary for The Awardee to supply the two (2) and three (3) yard containers to hold compacted refuse at a ratio of approximately 4:1. These containers are designed for front-end loading. THESE UNITS ARE IDENTIFIED ON THE BID SUMMARY SHEET BY A SINGLE ASTERISK (*) NEXT TO THE CONTAINER SIZE. Section 4 of the ITB states as follows at Special Condition 20: SMALL IN-HOUSE COMPACTION UNITS(approximately two yards): The following schools have in-house compaction units which will need to be provided by the Awardee. Waste is compacted at an approximate ratio of 3:1. Collins Elementary Oakridge Elementary Sheridan Hills Elementary Section 4 of the ITB states as follows at Revised Special Condition 14: PRICING – ALL INCLUSIVE COST GROUP 1 ITEMS 1– 58: Bidder shall submit fixed monthly costs where indicated on the Bid Summary Sheets for each location based on 4.33 weeks per month. (This number is derived by dividing 52 weeks by 12 months). Monthly costs stated shall be an all-inclusive cost for providing receptacles refuse removal and disposal including but not limited to all necessary labor services material equipment taxes tariffs franchise fees maintenance and applicable fees. SBBC agrees to pay the Broward County Disposal Adjustment (tipping fees) in effect at the time. Increases to this fee will be paid as assessed by Broward County. Any decreases in these rates shall be passed on to SBBC as well. No bid specification protest was filed by any person concerning the original ITB or Addendum No. 1. Nine companies submitted timely responses to the ITB. Each bidder submitted a monthly bid and an annual bid. The School Board thereafter ranked the respective bids. Intervenor was the apparent low bidder with a monthly bid of $39,576 and an annual bid of $474,918.38. All Service was the apparent second low bidder with a monthly bid of $40,540.90 and an annual bid of $486,490.80. WSI was the apparent third low bidder with a monthly bid of $47,671.71 and an annual bid of $572,060.52. Petitioner was the apparent fourth low bidder with a monthly bid of $50,177.73 and an annual bid of $602,132.76. On November 2, 2011, the School Board's Purchasing Department posted the agency's intended recommendation for award of the ITB. The intended decision was (A) to award to Intervenor as the primary vendor for Group 1 (1 through 58); and (B) to award to All Service as the first alternate for Group 1 (1 through 58). On November 4, 2011, Petitioner timely filed its Notice of Protest with the School Board's Purchasing Department. On November 14, 2011, Petitioner timely filed its Formal Bid Protest with the School Board's Purchasing Department and delivered the required bid protest bond. The School Board formed a Bid Protest Committee that met with Petitioner on December 19, 2011, to consider Petitioner's formal written protest in accordance with section 120.57(3)(d)(1) and School Board Policy 3320. The parties were unable to resolve the protest by mutual agreement and the School Board sent Petitioner a notice of non-resolution of dispute. Section 1 of the ITB precludes a bidder from withdrawing its bid within 90 days of its submission to the School Board. At the time of the formal hearing 106 days had passed since the submission of bids. No bidder, including Intervenor, has indicated that it committed an error in calculating its prices submitted under the ITB or asked the School Board to excuse it from the prices it offered under the ITB. To the contrary, Intervenor's counsel represented at the formal hearing that Intervenor was standing by its bid. Generally, compacted waste is heavier and more expensive to dispose of than non-compacted waste. The ITB identifies the number and size (in cubic yards) of the receptacles to be placed at each location and the number of pick-ups per weeks to occur for each receptacle. The ITB also informs the bidders whether a receptacle was compacted or non-compacted. If compacted the ITB set forth the ratio of compaction. Bidders were also asked to bid a monthly cost and any applicable fees charged by the facility receiving the waste to arrive at total monthly cost for each receptacle to be furnished. The bidders were required to provide a total monthly bid for the services and a total annual bid for the services. The bidders were to use the information set forth in the ITB to calculate their bids. Petitioner asserts that the bids submitted by Intervenor, All Service, and WSI were not responsible bids because those bids failed to factor in the higher costs of disposing of waste that had been compacted. Petitioner contends that the reference to compaction ratios constitute specifications by the School Board to require all bidders to calculate their pricing utilizing the compaction ratios. Petitioner describes the referenced compaction ratios as "multipliers" that needed to be used by the bidders in calculating their prices for handling and disposing of compacted waste. Petitioner is seeking to impose its interpretation of the ITB as requiring each of the bidders to calculate its bid using the same pricing methodology that Petitioner employed. There is no ambiguity in the ITB, and there is no factual basis to conclude that all bidders were required to prepare their bids in the same fashion as Petitioner. There is nothing set forth in the ITB that required the School Board to interpret its reference to the compaction ratios as being a specification of a "multiplier" for pricing as opposed to a description of the capacity of the receptacles to be used at each of the school locations. At no point is the word "multiplier" used in the ITB to specify that the bidders were required to engage in mathematics involving multiplying their prices against some unit price the bidders were specifying in their bids. The ITB specifies the frequency with which the varying container sizes needed to be picked up at each of the 58 schools with the weight or volume of the container not being a factor in setting the specification of how often the container is to be picked up by the awardee. No adjustments were to be made to the prices paid by the School Board based on the weight of the container when removed. The School Board did not specify in the ITB that a bidder was required to charge the same monthly cost at each school for a similarly-sized refuse container nor did the School Board require different pricing for compacted waste as compared to non-compacted waste. Petitioner's assertion that the bidders were required to use those ratios as a multiplier when bidding on the cost of disposing of compacted waste is rejected as being contrary to the plain language of the ITB. The compaction ratios were provided to the bidders as information only. There is no requirement that a bidder use a particular methodology in determining its bid amounts.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law it is RECOMMENDED that the School Board of Broward County Florida enter a Final Order that adopts the findings of fact and conclusions of law contained herein, dismisses the protest filed by Petitioner Ace Waste Services LLC, and upholds the award of the procurement to Choice as primary awardee and to All Service as alternate awardee. DONE AND ENTERED this 20th day of March 2012, in Tallahassee Leon County Florida. S Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 20th day of March 2012.

Florida Laws (3) 120.569120.57287.012
# 10

Can't find what you're looking for?

Post a free question on our public forum.
Ask a Question
Search for lawyers by practice areas.
Find a Lawyer