FLORIDIAN CONSTRUCTION AND DEVELOPMENT COMPANY, INC. vs DEPARTMENT OF ENVIRONMENTAL PROTECTION, 07-005636BID (2007)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Dec. 10, 2007 Number: 07-005636BID Latest Update: Apr. 22, 2008

The Issue The issue is whether the proposed disqualification of Petitioner’s bid is contrary to the agency's governing statutes, rules, or policies or contrary to the bid solicitation specifications within the meaning of Subsection 120.57(3)(f), Florida Statutes (2007).1

Findings Of Fact Petitioner is a closely held Florida corporation licensed in the state as a general contractor. Mr. Milton “Mitt” Fulmer is the owner, sole director, and only stockholder. Respondent is a state agency. Respondent regularly solicits bids for construction services to build and maintain its facilities. On August 3, 2007, Respondent issued an invitation to bid identified in the record as Bid No. 03-07/08 (the ITB). The ITB solicited bids to construct a new headquarters for the Apalachicola National Estuarine Research Reserve, commonly referred to in the record as ANERR. Four companies responded to the ITB. Petitioner submitted the lowest bid. Intervenor submitted the next lowest bid. Intervenor is a Florida corporation licensed in the state as a general contractor. The ITB required bidders to submit a bid bond in an amount equal to five percent of the amount of the bid, plus alternates. A bid bond is not a performance bond. A bid bond is customarily provided for gratis or a nominal charge, and variations in bid bonds do not result in a competitive advantage among bidders. A bid bond merely insures the successful bidder will enter into the contract and provide whatever payment and performance bonds (performance bond) the ITB requires. The Instructions to Bidders for the ITB required all bonds to be issued by a surety company that “shall have at least the following minimum rating in the latest issue of Best’s Key Rating Guide (Best's): 'A'” (the bond rating requirement). The bond rating requirement was a bid solicitation specification required for a bond to be acceptable to Respondent. Petitioner submitted a bid bond issued by a surety identified in the record as International Fidelity Insurance Company (IFIC). IFIC has Best's rating of "A-." Respondent proposes to reject Petitioner's bid for failure to satisfy the bond rating requirement and to award the bid to Intervenor as the second lowest bidder. The bond rating for the surety company that issued the bid bond for Intervenor is not in evidence. For reasons stated in the Conclusions of Law, Petitioner has the burden of proof. The parties provided the trier of fact with a wealth of evidence during the final hearing. However, judicial decisions discussed in the Conclusions of Law confine the purpose of this proceeding to a review of the proposed disqualification of Petitioner's bid at the time Respondent exercised that agency discretion. This proceeding is not conducted to formulate final agency action that determines which bidder should receive the contract or whether all of the bids should be rejected. The review of proposed agency action is limited to a determination of whether the proposed action violates a statute, rule, or specification. If a violation occurred, the review must then determine whether the violation occurred because Respondent exercised agency discretion that was clearly erroneous, contrary to competition, or an abuse of discretion. A preponderance of evidence does not show that the proposed agency action violates a statute, rule, or specification. That finding ends the statutorily authorized inquiry. In the interest of completeness and judicial economy, however, the trier of fact also finds that the exercise of agency discretion that led to the proposed agency action is not clearly erroneous, contrary to competition, or an abuse of discretion. It is undisputed that the proposed agency action does not violate a statute or rule. Petitioner implicitly argues that the proposed agency action violates the bond rating requirement in the bid specifications because an "A-" rating is equivalent to an "A" rating. The Best's ratings of surety companies are not equivalent. Before discussing the differences, however, it is important to note that Respondent did not base its proposed rejection of Petitioner's bid on an independent evaluation of the data used to distinguish the two ratings. The failure to conduct an independent evaluation of the differences in Best's ratings criteria was neither clearly erroneous, contrary to competition, nor an abuse of discretion. The differences in Best's ratings criteria are complex and proprietary. Respondent lacks sufficient staff and expertise to evaluate the data underlying the Best's ratings or the quality of surety companies. Respondent relied on its own experience, custom and practice in the surety industry, and advice of counsel. Respondent also took into account the unusual size and complexity of the ANERR project, time constraints, and the added risk aversion to any delay in starting the project. The proposed rejection of Petitioner's bid is consistent with Respondent's past practice. Respondent has consistently required compliance with bond rating requirements for bid bonds in previous projects. In the course of bidding 500 to 600 projects over approximately an eight-year period, only one of the apparent low bidders offered Respondent a bid bond from an "A-" rated surety when an "A" was required by the bid specifications. Respondent disqualified that bid, which was for a project of approximately four million dollars; the only previous project that approaches the $5-$6 million cost of the ANERR project. All other low bidders complied with the specification as written. Respondent reasonably inferred that the surety company for the bid bond would be the same for the performance bond. Respondent's experience with industry practice in the 500 to 600 previous projects suggests the surety company that writes the bid bond will also write the performance bond. It is also customary for a surety company to provide the bid bond for gratis or for a nominal charge because the surety company collects its premium upon writing the subsequent payment and performance bonds. Respondent's experience also shows that contractors must qualify for their surety bonds, and not all contractors succeed in qualifying for surety bonds. Moreover, not all contractors can succeed in procuring surety bonds from an A-rated company. The temporal exigencies between the award of the bid and the provision of a performance bond also supported Respondent's inference that the surety company for the bid bond would be the surety company for the performance bond. The General Conditions of the contract required Petitioner to submit evidence of its ability to provide the requisite performance bond within two working days of being notified of a successful bid. Petitioner had ten days to actually furnish the bond. Establishing a surety is not perfunctory but entails a prequalification process. Petitioner had to supply its bonding agent with information including project history, credit references, reviewed financial statements, personal financials, and details on its assets. Any delay in the ANERR project, in contrast to its previous projects, for reasons of contractor default or otherwise, would expose Respondent to greater risk and greater expense. Respondent reasonably experienced a heightened risk aversion for the ANERR project than the risk aversion Respondent experienced during previous projects. The $5 or $6 million price tag for the ANERR project is about 400 percent greater than all but one previous project in Respondent's experience. Unusual aspects of the project, including its design elements and its environmentally sensitive location, could be irreparably harmed in the event of default or delay. The nature of the project's funding, part of which is a federal construction grant that expires on a date certain and part of which involved taxes paid by Floridians, contributes to the unique qualities of the project that support Respondent's greater risk aversion in connection with the ANERR project. At the time Respondent had to make a decision to reject or accept Petitioner's bid, Respondent believed in good faith a distinction existed between Best's "A" and "A-" ratings. The Best's ratings publication is a summary based on data, much of which is proprietary. It would be pointless for Respondent to "cross examine" a summary before rejecting Petitioner's bid if significant portions of the data underlying the summary are proprietary and unavailable to the cross-examiner. If Respondent were to have sufficient staff and expertise to independently evaluate the data underlying the Best's ratings, if some of the data were not proprietary, and if such an evaluation were the basis for the proposed rejection of Petitioner's bid, the outcome would not alter the proposed rejection of Petitioner's bid. The Best's ratings are based, in relevant part, on Best's Capital Adequacy Ratio, commonly referred to in the record as BCAR. The BCAR score estimates the ability of a surety company to pay claims. The minimum BCAR score for an "A" rating is 145, meaning the value of a surety company's assets exceed its estimated claims by a minimum of 45 percent. The minimum BCAR score for a surety with an "A-" rating is 130, meaning the value of its assets exceed its estimated claims by 35 percent. Although a 15-percent differential may appear small, Best's states the differentials by reference to a range of scores. The actual differential between individual sureties with an "A" rating and an "A-" rating may be as little as one percent or as great as 29 percent. An independent evaluation by Respondent would have revealed a margin of error as large as 29 percent in the standard used to evaluate a surety company's ability to pay claims. If the proposed rejection of Petitioner's bid were based on an independent evaluation of the data underlying the Best's rating summaries, it would have been reasonable for Respondent to reject Petitioner's bid. It would have been reasonable for Respondent to reject a 29-percent margin of error for a surety company in a project that is 400 percent larger than the typical project and for which Respondent reasonably has a greater risk aversion due to the temporal limit on the availability of funds, the complexity of the project, and its environmental sensitivity. Much of the data underlying Best’s published ratings is proprietary information. However, the available evidence shows that Best's adjusts BCAR values based on qualitative factors such as: business plan, management quality, liquidity of assets, liabilities, and other operational aspects of the surety company. A qualitative analysis shows that ratings of "A" and "A-" are not the “functional equivalent” of each other. Petitioner submitted evidence that Best's "bands" surety companies with ratings of "A" and "A-" together in the Best's rating guide. However, the relevant specification in the ITB did not express the bond rating requirement in terms of a band or category. Rather, Respondent requested an "A" or better rating according to Best’s Key Rating Guide. An independent evaluation by Respondent would have provided a reasonable basis for an inference that the surety company for the bid bond and performance bond would be the same company. Petitioner has used IFIC for more than one year. During that time, IFIC has issued all of Petitioner’s bid bonds. IFIC issued Petitioner two payment and performance bonds. Petitioner was unable to identify any other surety company that had issued its payment and performance bonds within the time period during which Petitioner has used IFIC. Petitioner did not ask its insurance broker to obtain a bid bond from a company other than IFIC. When Petitioner sent a bid bond order form to its broker, Petitioner provided information to the broker about the project and the amount of the bid and Respondent’s surety requirements. The Bid Bond Order Form does not indicate the minimum bond rating requirement specified in the ITB. Mr. Fulmer had a conversation with his broker about Respondent’s bid security requirements, but it is unclear whether the relevant specifications were faxed to the broker or whether Mr. Fulmer saw the Bid Bond Order Form before it was provided to the broker. In response to the Bid Bond Order Form, the broker generated a bid bond and sent the bond to Petitioner for signature. At the time Petitioner received the bid bond, Petitioner did not consult Best’s Key Rating Guide to confirm that its surety met the minimum bond rating requirement in the ITB. It is unnecessary to determine whether the bond rating requirement was a material or immaterial requirement. If it were material, Respondent had no discretion to waive it. If it were non-material, within the meaning of Florida Administrative Code Rule 60D-5.002(9)(Rule), evidence discussed in previous Findings in this Order shows that the exercise of agency discretion underlying the refusal to waive the bond rating requirement was reasonable and was not clearly erroneous, contrary to competition, arbitrary, or capricious. Petitioner's bid protest is not, in substance, a challenge to the bid solicitation specification identified in this Order as the bond rating requirement. If the substance of the bid protest were deemed to be a challenge to a bid specification requirement, the challenge is untimely. On October 30, 2007, Respondent opened the bids, identified Petitioner as the apparent low bidder, consulted Best's for information on the "A-" rating, consulted with counsel, and disqualified Petitioner's bid. Petitioner filed a Notice of Intent to Protest on November 8, 2007, and a Petition to Protest on November 13, 2007. A deemed challenge to the specification for the minimum bond rating requirement was untimely within the meaning of Subsection 120.57(3)(b).

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is hereby RECOMMENDED that Respondent issue a final order dismissing the protest. DONE AND ENTERED this 21st day of March, 2008, in Tallahassee, Leon County, Florida. S DANIEL MANRY Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 21st day of March, 2008.

Florida Laws (2) 120.569120.57 Florida Administrative Code (1) 60D-5.002
# 1
NATIONAL CLEANING OF FLORIDA, INC. vs DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES, 92-004311BID (1992)
Division of Administrative Hearings, Florida Filed:Fort Lauderdale, Florida Jul. 15, 1992 Number: 92-004311BID Latest Update: Sep. 14, 1992

The Issue Whether Respondent properly rejected Petitioner's bid on the grounds that the bid did not meet a fatal item requirement.

Findings Of Fact On April 24, 1992, Respondent published a Request for Proposals (RFP) for the provision of housekeeping services to South Florida State Hospital. Attached to the RFP as Appendix I was a blank copy of Respondent's "Standard Contract" which is also referred to as its "core model contract". Paragraph 1.a. of Section D of the RFP contains the following instructions to bidders: BIDDER RESPONSE a. State of Florida Request for Proposal Contractual Services Acknowledgment Form, Pur 7033 The State of Florida Request for Proposal, Contractual Services Acknowledgment Form, PUR 7033, Appendix II must be signed and returned ... with the proposal or submitted by itself if you choose not to submit a proposal and wish to remain on the department's active vendor list. Paragraph 1.g. of Section D of the RFP, contains the following instructions to bidders: Required Bidders Certification Contract Terms and Conditions The proposal must include a signed statement in response to the RFP indicating acceptance of the terms and conditions of provisions of service as specified in the RFP and contained in the core model contract. Bidders were provided a copy of the RFP rating sheet which contained the following under the heading of Fatal Items: The following criteria must be met in order for the proposal to be considered for evaluation, failure to receive a "Yes" response for any time [item] will result in automatic rejection of the proposal. * * * Does the proposal include a statement agreeing to terms and conditions set forth in the core model contract and the RFP? Petitioner was represented at a "Bidders' Conference" held May 15, 1992, at which the fatal items were discussed. Bidders were advised that it would be necessary for the responses to contain a statement agreeing to the terms and conditions set forth in the core model contract. The State of Florida Request for Proposal, Contractual Services Acknowledgment Form, PUR 7033, contains the following certification: I certify that this proposal is made without prior understanding, agreement, or connection with any corporation, firm, or person submitting a proposal for the same contractual services, and is in all respects fair and without collusion or fraud. I agree to abide by all conditions of this proposal and certify that I am authorized to sign this proposal for the proposer and that the proposer is in compliance with all requirements of the Request for Proposal, including but not limited to, certification requirements. In submitting a proposal to an agency for the State of Florida, the proposer offers and agrees that if the proposal is accepted, the proposer will convey, sell, assign or transfer to the State of Florida all rights, title and interest in and to all causes of action it may now or hereafter acquire under the Anti-trust laws of the United States and the State of Florida for price fixing relating to the particular commodities or services purchased or acquired by the State of Florida. At the State's discretion, such assignment shall be made and become effective at the time the purchasing agency tenders final payment to the proposer. The State of Florida Request for Proposal, Contractual Services Acknowledgment Form, PUR 7033, was signed by Richard A. Cosby on behalf of Petitioner and submitted as part of Petitioner's response to the RFP. Upon receipt of all responses, Respondent convened an evaluation committee to evaluate the responses. The evaluation committee determined that the response submitted by Petitioner did not contain the required statement agreeing to the terms and conditions set forth in the core model contract and the RFP. Consequently, the evaluation committee rejected Petitioner's proposal from further consideration. Petitioner does not challenge the specifications of the RFP, but, instead, asserts that Mr. Cosby's execution of the State of Florida Request for Proposal, Contractual Services Acknowledgment Form, PUR 7033, was sufficient to meet the requirement the evaluation committee found lacking. The language of the Contractual Services Acknowledgment Form, PUR 7033, that most closely approximates the certification that the bidder accepts the terms and conditions set forth in the core model contract and of the RFP is as follows: I agree to abide by all conditions of this proposal and certify that I am authorized to sign this proposal for the proposer and that the proposer is in compliance with all requirements of the Request for Proposal, including but not limited to, certification requirements. The proposal submitted by Petitioner did not contain any other statement which could be construed as accepting the terms and conditions set forth in the core model contract and the RFP. The broad language of the Contractual Services Acknowledgment Form, PUR 7033, upon which Petitioner relies does not state that the bidder accepts the terms and conditions set forth in the core model contract and the RFP. The evaluation committee properly determined that Petitioner's response failed to meet this fatal item. In this proceeding, there was evidence that the Respondent routinely inserts in its Request for Proposals the fatal item requirement that the bidders agree in writing to accept the terms and conditions set forth in the core model contract and the RFP, and that Respondent has never waived that fatal item requirement. There was no evidence that Respondent was using this fatal item requirement to discriminate against or in favor of any bidder.

Recommendation Based upon the foregoing findings of fact and conclusion of law, it is hereby RECOMMENDED that the Respondent dismiss Petitioner's bid protest. DONE AND ENTERED this 18th day of August, 1992, in Tallahassee, Leon County, Florida. CLAUDE B. ARRINGTON Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 18th day of August, 1992. APPENDIX TO THE RECOMMENDED ORDER IN CASE NO. 92-4311BID The following rulings are made on the proposed findings of fact submitted on behalf of the Petitioner. 1. The proposed findings of fact submitted by Petitioner are accepted in material part by the Recommended Order. Petitioner's conclusions based on those facts are rejected for the reasons discussed in the Recommended Order. The following rulings are made on the proposed findings of fact submitted on behalf of the Respondent. 1. The proposed findings of fact submitted by Respondent are adopted in material part by the Recommended Order. COPIES FURNISHED: Richard A. Cosby, Vice President National Cleaning of Florida, Inc. 1101 Holland Drive, #32 Boca Raton, Florida 33487 Colleen A. Donahue, Esquire District 10 Legal Office Room 513 201 West Broward Boulevard Fort Lauderdale, Florida 33301-1885 Sam Power, Agency Clerk Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, Florida 32399-0700 John Slye, General Counsel Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, Florida 32399-0700

Florida Laws (3) 120.57287.012287.057
# 2
NATIONAL WATER MAIN CLEANING CO vs DEPARTMENT OF TRANSPORTATION, 17-000589BID (2017)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Jan. 24, 2017 Number: 17-000589BID Latest Update: May 10, 2017

The Issue Whether Respondent’s intended action to award Contract No. E3Q37 to VacVision Environmental, LLC, for “Milton Operations Routine Maintenance,” is contrary to Respondent’s solicitation specifications.

Findings Of Fact The Department is an agency of the State of Florida tasked with procuring the construction of all roads designated as part of the State Highway System or the State Park Road System, or of any roads placed under the Department’s supervision by law. See § 334.044, Fla. Stat. (2016).1/ Further, the Department has the duty to ensure that maintenance of sewers within the right-of-way of the roadways within its jurisdiction does not degrade the integrity of its facilities. See § 337.401, Fla. Stat. Petitioner, National Water Main Cleaning Co., is a full- service maintenance and rehabilitation pipe contracting business based in New Jersey. The company has been in business since 1949 and primarily contracts with government entities to perform storm and sanitary sewer inspection, cleaning, and repair. On October 11, 2016, the Department published a bid solicitation notice for the Contract, seeking contractors to desilt, remove blockages from, and install liners in existing underground sewer pipe on a specified state road in Santa Rosa County. The ITB included specifications, plans, and a proposal form with specific work items. The ITB contained the following relevant language requiring a bid bond for proposals over $150,000: For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier’s check, trust company treasurer’s check, bank draft of any National or state bank, or a Surety Bid Bond made payable to the Florida Department of Transportation must accompany each bid in excess of $150,000.00. * * * Bid Bonds shall substantially conform to DOT Form 375-020-09 furnished with the Proposal. Surety2000 or SurePath electronic Bid Bond submittal may be used in conjunction with Bid Express internet bid submittal. For more information please visit https://www.surety2000.com [f]or Surety2000 or https://www.insurevision.com for SurePath. Paper Bid Bonds will also be accepted for bids submitted through Bid Express provided they are received prior to the deadline for receiving bids, by the locations(s) identified in the Bid Solicitation Notice for receiving bids for the advertised project(s). If an electronic bid bond is not being submitted, the bidder must submit an original bid bond. (A fax or copy sent as an attachment will not be accepted.) (emphasis added). The deadline for submission of bids was Thursday, November 10, 2016, at 2:00 p.m. On November 10, 2016, the Department received and opened bids from both Petitioner and Intervenor, as well as two other vendors. Petitioner’s bid for the project was the lowest at $504,380.70. Intervenor’s bid was the next lowest at $899,842. Petitioner submitted its bid for the project through Bid Express, the Department’s electronic bid submission website. Along with its bid, Petitioner submitted several attachments in a .zip file, including a .pdf copy of a bid bond from Traveler’s Casualty and Surety Company in the amount of 5 percent of the total amount of the bid. Petitioner did not submit an electronic bid bond through either Surety2000 or SurePath, nor did it submit the original paper bid bond prior to the deadline for submission of bids. The original paper bid bond remained in the possession of Petitioner’s President, Salvatore Perri, on the date of the final hearing. Petitioner’s bid was reviewed by employees of the Department’s District 3 Contracts Administration Office and deemed “non-responsive” because the bid bond submission did not comply with the bid specifications. On December 7, 2016, the Department posted its notice of intent to award the Contract to Intervenor. The .pdf copy of the bid bond Petitioner attached to its bid for the project was on Department form 375-020-09, Bid or Proposal Bond. Form 375-020-09 contains the following note: “Power of Attorney showing authority of Florida Licensed Insurance Agent to sign on behalf of, and bind, surety must be furnished with this form. Affix Corporate Seal of Surety.” The Power of Attorney accompanying Petitioner’s bid bond contains the following language: “Warning: THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER.” The attached Power of Attorney is a copy in black-and- white, rather than an original with the red border. Waiver Pursuant to the ITB, and by operation of section 120.57, Florida Statutes, the deadline to file a protest to the bid specifications was October 14, 2016, 72 hours after posting of the ITB. Petitioner did not file a protest to the specifications of the ITB.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that: Respondent, Department of Transportation, enter a final order adopting the Findings of Fact and Conclusions of Law set forth herein, and award Contract E3Q37 for Milton Operations Routine Maintenance, to Intervenor, VacVision Environmental, LLC. DONE AND ENTERED this 19th day of April, 2017, in Tallahassee, Leon County, Florida. S SUZANNE VAN WYK Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 19th day of April, 2017.

Florida Laws (7) 120.569120.57120.68334.044334.187337.40190.953
# 3
WINKO-MATIC SIGNAL COMPANY vs. DEPARTMENT OF TRANSPORTATION, 84-002250 (1984)
Division of Administrative Hearings, Florida Number: 84-002250 Latest Update: Jan. 18, 1985

Findings Of Fact On March 1, 1984, Respondent gave notice to qualified contractors that it would receive sealed bids for State Project No. 72000-3541, referred to as Federal-Aid Project No. M 9041(10). This project involves the installation of a computerized traffic control system for the City of Jacksonville. In response to the opportunity to bid, the Department of Transportation received four bids. Petitioner, Winko-Matic Signal Company, was among the bidders. The other bidders were Georgia Electric Company, Traffic Control Devices, Inc., and Sperry Systems Management. The bids of Traffic Control Devices and Sperry Systems were rejected based upon an error in bid tabulations on the part of Traffic Control, a mistake on the quantities page, with the Sperry rejection being based upon a bid bond problem. Traffic Control had been the apparent low bidder with a bid of $1,964,115. Winko-Matic was the second apparent low bidder with a bid of $2,279,604.70. The Department of Transportation had estimated that the total cost of the Jacksonville project would be $ 2,024,680.61. Having discarded the bid of Traffic Control Devices, the Department of Transportation telegrammed Winko-Matic on April 4, 1984, advising Winko-Matic that it was the apparent low bidder for the Jacksonville project. Subsequently, the awards committee of the Department of Transportation met on April 18, 1984, and determined to reject all bids and re-advertise the job. In the course of this meeting the awards committee was told that there were erratic bids received on contract items, pointing to some perceived confusion among the contractors as to requirements of the contract. Discussion was also held on the possibility of establishing a pre-bid conference if the project was re advertised. The awards committee then voted to reject the bids on the basis that the apparent low bidder, Winko-Matic, had submitted a bid which-was 12.6 percent over the Department's estimate, instead of being within 7 percent of the Department of Transportation's pre-bid estimate, a point above which the Department of Transportation in its non-rule policy would call to question to the acceptability of the apparent low bid. In addition to deciding to reject all bids and re-advertise, it was determined that a pre-bid conference should be scheduled at least 30 days prior to the bid-letting date. Winko-Matic was advised that the Department of Transportation's decision to reject all bids by correspondence of May 4, 1984, in which it was indicated that all bids had been rejected based upon the fact that they were too high. In response to this notice of rejection, Winko-Matic, effective May 17, 1984, filed a written notice of protest. The case was subsequently referred to the Division of Administrative Hearings on June 20, 1984, and a final hearing date was established by Notice of Hearing of July 5, 1984. The hearing date in this cause was September 12, 1984. The Jacksonville project in question requires the utilization of what has been referred to "UTCS Enhanced" software. This software package is unique and has only been used in a limited number of locations within the country. Those locations are Los Angeles, California; San Diego, California; Broward County, Florida; and Birmingham, Alabama. Another unique feature within the project design is the use of an associated coaxial computer sys gem. Given the unique nature of this project and the fact that the Department of Transportation had never advertised for bids related to UTCS software, Department of Transportation obtained assistance from a consulting firm, Harland, Bartholomew & Associates. In fulfilling its function Harland gave estimates to include an estimate related to the projected cost of the software, Item 681-102. The Harland estimate for the overall project was $2,143,130 including a $100,000 estimate for the software system. That estimate relating to the software was subsequently adjusted by the Department of Transportation to depict a cost of $13,780. The Department of Transportation estimate was based upon information within its computer related to a system unlike the enhanced software contemplated by the plans and specifications. In other words, the stored information in the Department of Transportation computer was not the same as contemplated by the plans and specifications in the Jacksonville project. Moreover, the initial estimate of Harland was based upon the idea of an extended software system, as opposed to an enhanced software system. Winko-Matic had bid $389,500 for the software in Item 681-102. That estimate was premised upon figures obtained from JHK and Associates, the group which Winko-Matic intended to use as its subcontractor for the enhanced software portion of the project. JHK developed the software and was responsible for systems integration of the Los Angeles, California, project, one of the locations in which UTCS enhanced software has been utilized. JHK premised its estimate for the software hare upon experience in Los Angeles and an evaluation of the tasks to be performed related to the enhanced software. This included general software development activities, hardware innovation, installation costs during the period of acceptance and testing, and the preparation of data base. The JHK bid price was $339,500. Another $50,000 was added to that price related to what the Petitioner describes as its management costs for that item. By June 20, 1984, when a further meeting was held by the awards committee on the subject of the Jacksonville project, it was concluded that the estimate made by the Department of Transportation of $13,780 was not correct, on the topic of the enhanced software. A more reasonable estimate, according to the information imparted in this session, would be $200,000 for enhanced software as called for in this project, with a $100,000 amount being a reasonable estimate had they chosen to use extended software. Adjusting the initial price related to the UTCS enhanced software to reflect a corrected estimate of the Department of Transportation in its original advertised bid, that estimate becomes $2,210,900.61 and its consultant Harland's estimate becomes $2,243,130. With this adjustment, the differential in the estimate made by the Department of Transportation and the Petitioner approaches 3 percent and not the 12.6 percent originally found. The 3 percent is below the threshold of 7 percent used as the policy for determining whether a bid might be rejected as being far beyond the acceptable limits set forth in the Department of Transportation's estimate. In the aforementioned June 20, 1984, awards committee meeting, the Department of Transportation continued to hold the opinion that all bids in the Jacksonville project should be rejected and the matter re-advertised. Although the problem pertaining to the estimate of the cost of the enhanced software package had been addressed, the committee continued to feel that the prices received in the bid letting were erratic Reference was also made to revisions or modifications to the project plan which would be offered if the matter were re- advertised. It was also pointed out that the Federal Highway Administration would concur in the Department's decision to reject all bids and would accept modifications. The awards committee again voted to reject the bids. The matter was again considered by the awards committee on August 31, 1984. On that occasion, it was pointed out that the revisions contemplated by the Department of Transportation, should the matter be re-advertised, would not affect in a substantial way the cost estimate for the project with the exception of Item 680-101, the system control equipment (CPU), which would promote a lower price for the project. The committee determined in the August, 1984, meeting to reject all bids and re-advertise. While the initial notice of rejection of May 4, 1984, had suggested the basis for rejection as being the fact that Petitioner's bid far exceeded the 7 percent allowance for price above the Department of Transportation's estimate of costs, the meetings of the awards committee and the suggestion of the Respondent in the course of the final hearing in this case indicated that there were other reasons for the decision to reject. Those Were: (a) an apparent lack of clarity among bidders regarding specifications for the Jacksonville job, (b) the desire of the Respondent to revise specifications on the Jacksonville project; and (c) a lack of sufficient competition in the bids. In connection with the first of the additional reasons Respondent suggests that variations within the bid responses related to particular line items within the specifications point out a lack of clarity in the project's specifications or confusion by bidders related to those specifications. Respondent did not bring forth any of the bidders who might speak to the matter of possible confusion or misunderstanding concerning some of the bid items. By contrast, the Petitioner's president; the president of JHK & Associates and James Robinson, Harland's project manager for the Jacksonville job, did not find the specifications in the original documents to be confusing. In addition, the testimony of those individuals established the fact that bid variations related to particular line items are not extraordinary and do not establish any apparent confusion by the bidders as to the requirements of those line items. In effect, what the differentials demonstrate are variations related to the manufacture or in-house capabilities of the bidders and an effort to allocate discretionary costs in various places as to line items. Moreover, they might indicate last- minute adjustments in the bid quote prior to the opening and a possible effort by a contractor to enter into a new job market. Finally, they demonstrate offsetting which is the allocation of item prices by a contractor to maximize profits. To do this, a contractor submits high bids on items representing quantities which the contractor feels will increase after the contract is awarded and submits low bids on items representing quantities which are not likely to change. In summary, while the Department of Transportation in its presentation expressed some concern about the variations in the pricing in the bid quotations offered by the respective bidders in this project, its suspicions on the question of the possible clarity of its specifications were not confirmed and are not convincing. On the topic of revisions which the Department of Transportation would offer if the matter were re-advertised, with one exception those matters appear to be items that could be attended through change orders or supplemental agreements. They are not matters which necessarily must be addressed through a rejection of all bids and a re-advertising of the project. The lone exception to this is the possibility that the Department of Transportation may not be able to protect its proprietary rights in the enhanced software which is being developed for the project, under the terms of the present bid documents. Given that uncertainty, the Respondent would wish to re-advertise the project and make certain that its proprietary interests are protected. Finally, Respondent has alluded to the fact that the Jacksonville project should be re-advertised in view of the lack of competition in the initial letting. Only four bidders expressed an interest in this project at the time of the first letting. Of those, two bidders were found to be responsive. While this is a low number of bidders, there does not appear to be any agency practice on the part of' the Department of Transportation to the effect that this number of bidders would not be accepted. Moreover, no indication has been given that should the matter be re-advertised a greater number of bidders would express an interest than was the case in the first letting. Consequently, this reason for bid rejection is not acceptable. If Respondent did not reject the bids and re-advertise the project, Winko-Matic would be the successful bidder in the Jacksonville project.

Florida Laws (3) 120.53120.57337.11
# 4
HURST AWNING COMPANY, INC. vs DEPARTMENT OF TRANSPORTATION, 94-002297BID (1994)
Division of Administrative Hearings, Florida Filed:Miami, Florida Apr. 27, 1994 Number: 94-002297BID Latest Update: Jun. 24, 1994

Findings Of Fact Based upon the oral and documentary evidence adduced at the final hearing and the entire record in this proceeding, the following findings of fact are made: In January of 1994, FDOT issued an Invitation to Bid ("ITB") for contracts FE2494Z1 and FE2494Z2 to provide storm shutters for the FDOT facilities in Zones 1 and 2 of the Florida Turnpike. The ITB was entitled "Storm Shutters, Removable, Manufacture, Furnish and Install." Prospective bidders for the contracts were provided with a packet which included General Conditions, Special Conditions, Specifications and General Special Provisions. The General Conditions set forth the procedures for submitting and opening the bids. The Specifications called for custom-sized removable storm shutters and detailed the materials and installation procedures that were required. The bid package contained the following pertinent language in the Special Conditions, Section 1.0, entitled "Description", and in the Specifications, Section 1.0, entitled "Scope of Work": Work under this contract consists of providing all labor, materials, equipment, tools and incidentals necessary to manufacture, furnish and install galvanized steel storm panels and accessories for all of Zone 1 & Zone 2 buildings and locations as identified in the building listing listings document, see Exhibit "A" Zone 1 & Exhibit "A" Zone 2. The bid package contained the following pertinent language in Special Conditions Section 8.1, entitled "Required Documents": Bidders are required to complete and return the State of Florida "Invitation to Bid" form as well as the bid sheet(s). These forms must be signed by a representative who is authorized to contractually bind the bidder. All bid sheets and the "Invitation to Bid" form must be executed and submitted in a sealed envelope. At a mandatory pre-bid conference on February 17, 1994, the Department's representatives were available to answer questions regarding the bid package. During the pre-bid conference, John Vecchio of the Department orally advised the prospective bidders that they should return the whole bid package, including the specifications, when they submitted their bid. No written amendment to this effect was issued. The bids were opened on March 3, 1994 in Fort Lauderdale. Bids were received for each contract from at least three bidders, including Accurate and Hurst. The apparent low bidder for both contracts was Broward Hurricane Panel Co. ("Broward"). Prior to the bids being posted on March 28, 1994, Broward's bid was determined to be nonresponsive and Broward was therefore disqualified. After Broward was disqualified, Accurate was the apparent low qualified bidder for Zone 2 and Hurst was the apparent low qualified bidder for Zone 1. Hurst's bid for the contract for Zone 2 was $85,000. Its bid for the Contract for Zone 1 was $36,000. Accurate's bids for the contracts were $84,854.82 and $36,287.16, respectively. Hurst was awarded the contract for Zone 1 and that decision has not been challenged. At the same time the Department announced the award of the Contract for Zone 1 to Hurst, the Department announced its intent to award the contract for Zone 2 to Accurate. Hurst timely filed a notice of protest and a formal written protest of the proposed award of the contract for Zone 2 to Accurate. Initially, FDOT raised as a defense that Hurst had not posted a protest bond as required by Section 287.042(2)(c), Florida Statutes. At the hearing in this matter, FDOT conceded that Hurst had subsequently posted a protest bond which had been accepted by FDOT. Hurst contends that Accurate's bid should have been deemed nonresponsive because Accurate does not have the ability to "manufacture" the specified product in its own facility. The 2 inch corrugated shutter required by the ITB has to be shaped on a special type of machine that rolls, presses and forms the metal. Hurst owns and maintains at its Opa-Locka facility a rolling mill capable of forming the panels to the bid specifications. Accurate is in the business of supplying the types of products sought by the ITB in this case. However, Accurate does not own the kind of machine necessary to shape the metal. The evidence established that for many years, Accurate has had a continuing business relationship with a local subcontractor, Shutter Express, that rolls, presses and forms raw material supplied by Accurate in accordance with Accurate's specifications. Shutter Express has the capability of fabricating shutters with a 2 inch corrugation in accordance with the ITB. Accurate is equipped to attach the headers and sills, drill the necessary holes, complete the assembly and install the final product. The ITB in this case did not preclude subcontracting any or all of the work specified. While the description of the work in the ITB includes the term "manufacture", this reference should not be read to mean that only those companies that were able to fabricate the entire product at their own facility could properly respond to the ITB. There is no logical justification for such a narrow interpretation. Only a few companies have the ability to completely fabricate the shutters on their own property. At the prebid conference, there was discussion amongst the prospective bidders about subcontracting the fabrication work and the FDOT representatives did not raise any objections to such an arrangement. It was widely understood by the parties present at the pre-bid conference that the Department was not interpreting the ITB in the restrictive manner now urged by Hurst. Such a reading of the ITB would have precluded from the bidding process a number of companies such as Accurate that routinely supply and install shutters. Hurst also contends that the bid proposal submitted by Accurate should be deemed nonresponsive because Accurate failed to include the entire ITB with its proposal in accordance with the oral instructions at the pre-bid conference. Hurst's proposals included the entire ITB. As discussed below, Accurate's proposal did not include the entire ITB. FDOT determined that all essential pages were included in Accurate's response and the evidence did not establish that this conclusion was arbitrary, capricious or fraudulent. Paragraph 6 of the General Conditions of the ITB provided: ADDITIONAL TERMS AND CONDITIONS: No additional terms and conditions included with the bid response shall be evaluated or considered and any and all such additional terms and conditions shall have no force and affect and are inapplicable to the bid. As noted above, at the prebid conference held on February 17, 1994, an FDOT employee told all prospective bidders to return the entire bid package when making their submittals. This request that the entire bid package be returned was simply meant as a protection for the bidder to ensure that all the necessary documents referenced in Section 8.1 of the Specifications were submitted. Other than those documents referenced in Section 8.1 of the Specifications, FDOT had no interest in having the remaining portion of the ITB submitted with a proposal. Accurate's submittal contained every document required by Section 8.1 of the Specifications. Accurate's proposal did not contain pages 3 through 12, 14, 15 and 17 through 20 of the ITB, but did include pages 1 and 2, 13, 16, 21 and 22 along with a signed Form PUR 7068 and a signed acknowledgment of Addendum In other words, the submittal contained a signed and completed Bidder Acknowledgment, completed Bid Price Forms for Zones 1 and 2, a signed copy of Addendum #1, a completed copy of the Ordering Instructions, and a signed, but not notarized, statement regarding public entity crimes. 1/ In addition to the "REQUIRED DOCUMENTS," set forth in Section 8.1 of the Specifications and quoted in Findings of Fact 6 above, the ITB included Section 8.2, "PUBLIC ENTITY CRIMES STATEMENT" which provides: Any person submitting a bid or proposal in response to this invitation should execute the enclosed form PUR 7068, SWORN STATEMENT UNDER SECTION 287.133(A), FLORIDA STATUTES, ON PUBLIC ENTITY CRIMES, including proper check(s) provided, and submit it with the bid/proposal or within 72 hours of the bid opening. Page 7 of the ITB provided in pertinent part: 10.0 BID PREFERENCE IDENTICAL TIE BIDS - Preference shall be given to businesses with drug-free workplace programs. Whenever two or more bids which are equal with respect to price, quality and service are received by the State or by any political subdivision for the procurement of commodities or contractual services, a bid received from a business that certifies that it had implemented a drug-free workplace program shall be given preference in the award process. . . . Accurate's proposal did not include a certification that it was a drug-free workplace in accordance with this provision. However, such a certification is only used by the Department as a tie-breaker. In other words, in the event of identical bids, any firm with a drug-free workplace would get preference. Since there were no tied bids in this case, certification was totally irrelevant. When the bids were opened, Mary Bailey, the contracts administrator for the Department, noticed that Accurate's submittal was thinner than the others and asked Accurate's representative, Richard Johnson, about the remaining pages. Mr. Johnson replied that the other pages were in his truck and offered to retrieve them. Ms. Bailey told him there was no need to do so. Section 10 of the General Conditions in the bid package provides as follows: As the best interest of the State may require, the right is reserved...to reject any and all bids or waive any minor irregularity or technicality in bids received... It does not appear that Accurate has obtained any competitive advantage as a result of its failure to include the entire ITB with its bid proposals. Even if the oral instructions at the pre-bid conference are deemed to have modified the ITB so that the entire bid package should have been submitted, Accurate's failure to include the entire ITB with its response should be considered a minor technicality, pursuant to Section 10 of the General Conditions cited above, that can and should be waived in evaluating the responsiveness of the bid. Similarly, the failure to have the Form PUR 7068 notarized may have rendered Accurate's bid proposals incomplete, but not necessarily nonresponsive. This oversight can be easily corrected without giving Accurate a competitive advantage.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that a Final Order be entered finding the bid submitted by Accurate to be responsive and dismissing the challenge filed by Hurst. DONE and ENTERED this 24th day of June 1994, at Tallahassee, Florida. J. STEPHEN MENTON Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 24th day of June 1994.

Florida Laws (8) 120.53120.57287.042287.087287.133287.16337.02337.11 Florida Administrative Code (2) 60A-1.00160A-1.002
# 5
M. J. ANDERSON, INC. vs. PALM BEACH COUNTY SCHOOL BOARD, 89-002175BID (1989)
Division of Administrative Hearings, Florida Number: 89-002175BID Latest Update: Jun. 26, 1989

Findings Of Fact Based upon the testimony of the witnesses and the documentary evidence received at the hearing, I make the following findings of fact: The School Board of Palm Beach County advertised for sealed bids for a project consisting of structural modifications and reroofing at Atlantic Community High School, project no. 000881600. All bidders were required to be prequalified by the School Board prior to the bid opening and had to exhibit evidence that similar work of equivalent magnitude had been accomplished prior to this bid. Language in the bid advertisement notified potential bidders that the School Board reserved the right to waive minor informalities in the bids, or to reject all bids. On April 5, 1989, the bids for the Atlantic Community High School (Atlantic) project were opened and a tabulation performed. All bidders had been prequalified by the School Board and had properly submitted the required bid bond. The results of the bid tabulation established GRI as the lowest bidder, Anderson second, and Milne & Nicholls third. Only three bids were timely received. The amount indicated on the GRI bid was stated only in numbers, not written in words. The written numbers, however, were clearly noted and GRI has, at all times, stated it intends to be bound by the figures listed. No error in the amount has been suggested. On April 5, 1989, Dr. Louwers, as contract administrator for the School Board, notified GRI that its bid for the Atlantic project had been deemed nonresponsive. The basis for this determination was GRI's failure to submit the bid book intact, failure to submit bid Form 00420 at the time of the bid opening, the lack of a warranty letter at the time of the bib opening, and the failure to state the price of the bids in words. GRI sought review of the determination that it had been nonresponsive and an informal hearing was conducted on April 11, 1989. As a result of that hearing, GRI'S bid was deemed responsive and all bidders were notified. Thereafter, Anderson timely challenged the intended bid award to GRI. At the time of the bid opening, GRI did not submit its bid book intact. Instead, GRI submitted the proposal form with the amounts indicated for each section together with the bid bond. The bid proposal form required the bidders to indicate an amount in several categories. These categories included a base bid and six alternates numbered 1 through 6. The amounts listed by all bidders were tallied and are specified on joint exhibit no. 10. GRI's bid was the lowest of the three bids received. Once the bids were opened, and it was determined who the three low bidders were, GRI immediately submitted its list of major subcontractors on Form 00420. Within 24 hours of the bid opening, GRI submitted its list of subcontractors and suppliers, Form 00430. Pertinent to this case are the following provisions found in the Instructions to Bidders, section 00100 of the bid package: BIDDING PROCEDURES: 3.01 All bids must be prepared using the forms contained in these specifications and submitted in accordance with the Instructions to Bidders. * * * 3.05 Preparation and Submission of Bid Proposal Form: Each bidder shall use Proposal Form contained in these specifications, indicate his bid prices thereon in proper spaces, for the entire work and for the alternates. Proposal Forms shall remain attached to the specifications.... Each proposal shall specify a unit price written in ink in both words and figures, * * * (d) The specification book is to be left INTACT, the cover signed by the Contractor, the proposal bid guarantee (Certified Check or Bid Bond) to be signed and filled out in the specification book which will be enclosed in a sealed envelope which shall be marked: * * 3.10 Subcontractors: At the time of the bid opening each bidder submitting a bid shall have in his possession a written list of the major subcontractors; namely, structural metal work and metal covering, structural manufacturer, lightweight insulating concrete, plumbing, HVAC, and electrical, whom he proposes to use on this work. The three (3) apparent low bidders will be required to submit Form 00420 (list of major subcontractors) to the Owner at the time of the opening of the bids.... Within 24 hours of the bid opening, the apparent low bidder shall submit Form 00430 (list of subcontractors and suppliers), completed in full to the Owner. Failure to submit these lists within the time period specified herein shall result in a non- responsive bid. * * * 6. REJECTION OF BIDS: 6.01 The bidder acknowledges the right of the Owner to reject any or all bids and to waive any informality or irregularity in any bid received. In addition, the bidder recognizes the right of the Owner to reject a bid if the bidder failed to furnish any required bid security, or to submit the data required by the bidding documents, or if the bid is any way incomplete or irregular; to reject the bid of a bidder who is not in a position to perform the contract; and to re- advertise for other or further bid proposals. In addition to the foregoing, the apparent three lowest bidders were required to submit certifications to verify information regarding the roofing system included in their proposals. These certifications included: a certification verifying that the pre-engineered metal roofing system had been tested and approved by Underwriter's Laboratory as Class 90; a dealer certification verifying the supplier is a manufacturer's authorized and franchised dealer of the roofing system to be furnished including the date on which authorization was granted; an installer certification specifying that the installer had been regularly engaged in the installation of pre-engirieered metal buildings of same or equal construction to the system proposed including a list of successful installations performed within 200 miles of West Palm Beach, Florida; and a manufacturer's certification verifying that the manufacturer will provide warranties in accordance with the bid specifications. These certifications were to be provided with Form 00430, within 24 hours of being determined an apparent low bidder. GRI did not provide the certifications identified in paragraph 8 within 24 hours of April 5, 1989; however, all certifications were submitted prior to the final hearing in this cause. GRI was not deemed responsive by School Board personnel until after the informal hearing conducted on April 11, 1989. The letter to GRI notifying it of the results of the informal hearing was dated April 19, 1989. The issue of the certifications, therefore, did not arise until Anderson sought to challenge the decision reached by the informal hearing (that GRI was responsive). Anderson submitted all data required by the bid package at the time of the bid opening or within 24 hours of being determined an apparent low bidder. Anderson submitted the bid package intact and complete. According to bark Lottes, the project architect for the Atlantic bid, the manufacturer's certification required to be submitted within 24 hours of the the bid package was to assure the School Board that it would obtain the warranty designated in the bid specifications. Typically, a warranty is not issued until the work is completed. The purpose of the manufacturer's certication is to verify that the warranty, when issued, will be of the type and terms designated by the bid package. No structural deck replacement will be required for the Atlantic job. A general contractor would be required to perform structural deck replacement. GRI listed a general contractor, Mancini Building, among its list of subcontractors and suppliers. The roofing system proposed by GRI is to be manufactured by Varco- Pruden. The installer to perform the structural metal work for the roofing system proposed by GRI is Bretsnyder Netals, Incorporated (Bretsnyder). Bretsnyder has prior experience with metal roofs of the type designated by this bid project. Varco-Pruden has acknowledged Bretsnyder to be an authorized installer of the Varco-Pruden roofing system proposed by GRI. Varco-Pruden has provided a certification that it will warranty the roofing system pursuant to the bid specifications. GPI is registered as a roofing contractor with Gregg Wallick as its licensed roofing contractor. Anderson is a registered general contractor.

Recommendation Based on the foregoing, it is RECOMMENDED: That the School Board of Palm Beach County enter a final order awarding the bid for the Atlantic project, project no. 000881600, to GRI, Inc. as the lowest responsive bidder. DONE and ENTERED this 23rd day of June, 1989, in Tallahassee, Leon County, Florida. JOYOUS D. PARRISH Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32301 (904)488-9675 Filed with the Clerk of the Division ofAdministrative Hearings this 23rd day of June, 1989. APPENDIX TO THE RECOMMENDED ORDER IN CASE NO. 89-2175BID Rulings on the proposed findings of fact submitted by Anderson: Paragraphs 1 through 3, 5, 6, 7, and 8 are accepted. Paragraph 4 is rejected as irrelevant or immaterial. Whether or not a general contractor is required to perform portions of the work for the Atlantic project is irrelevant to the resolution of the issue in this case. First, because a general cortractor was listed among GRI's subcontractors (the list of which was timely filed) and second, because the weight of the testimony established the project to be roofing in nature with no structural work required. Paragraph 9 is rejected as argument or unsupported by the weight of the evidence in this cause. Rulings on the proposed findings of fact submitted by the School Board: Paragraphs 1 through 15 are accepted. Paragraph 16 is rejected as irrelevant. Rulings on the proposed findings of fact submitted by GRI: Paragraphs 1 through 4 are accepted. Paragraph 5 is accepted to the extent that it states the GPI bid to be lowest; however, as to the exact amount of the difference, it is rejected as contrary to the weight of the evidence. Paragraphs 6 through 8 are accepted. Paragraph 9 is rejected as argument. To the extent that the paragraph is addressed in findings of fact paragraphs 4 and 5, it is accepted. Paragraph 10 is accepted. Paragraph 11 is rejected as conclusion of law or argument except as provided in paragraphs of the preliminary statement, together with paragraphs 6, 8, 9, 12, and 13. COPIES FURNISHED: Jack S. Cox Merola, McCarthy & Cox, P.A. 4114 Northlake Boulevard Suite 301 Palm Beach Gardens, Florida 33410 Robert A. Rosillo Associate Counsel School Board of Palm Beach County 3323 Belvedere Road P.O. Box 24690 West Palm Beach, Florida 33416-4690 Nathan E Nason Gary N. Gerson Nason, Gildan, Yeager & Gerson, P.A. Post Office Box 3704 West Palm Beach, Florida 33402 Thomas J. Mills Superintendent of Schools School Board of Palm Beach County 3323 Belvedere Road P.O. Box 24690 West Palm Beach, Florida 33416-4690

Florida Laws (2) 489.1056.01
# 6
JOHN G. GRUBBS, INC. vs SCHOOL BOARD OF CITRUS COUNTY, 93-004325BID (1993)
Division of Administrative Hearings, Florida Filed:Brooksville, Florida Aug. 04, 1993 Number: 93-004325BID Latest Update: Oct. 29, 1993

Findings Of Fact By invitation to bid for Architect's Project No. 9129-A, the Board solicited bids for "construction of one new single story building at Lecanto School Complex in Lecanto, Florida." Joint Exhibit No. 1, p. 01010.1. Specifications (Re)stated The invitation to bid gave notice of a mandatory pre-bid conference at two o'clock on the afternoon of June 10, 1993, at Lecanto Vocational Center at the project site. Joint Exhibit No. 1, A-1. ("BIDDERS MUST ATTEND . . . TO BE ABLE TO BID") The invitation to bid consisted of a project manual, amended seriatim in a series of four addenda. Joint Exhibit No. 1. The project manual required substantial completion of the project within 250 days of written notice to proceed, Joint Exhibit No. 1, p. 00700.8, but on another page the same document required substantial completion by July 13, 1993. Id. at 00100.8. Later Addendum No. 1 put the date for substantial completion at "250 days after Notice to Proceed is given," but superseding Addendum No. 2 reverted to July 13, 1993. Addendum No. 3 directed prospective bidders to "[d]elete all previously issued Proposal Forms and replace with the Proposal Form attached." The attached form states: The undersigned agrees that if this bid is accepted, construction of this project will begin after receipt of "Notice to Proceed" and shall be substantially completed within 250 calendar days and finally completed within thirty (30) calendar days from substantial completion. Directions concerning the form specify that it is to "be copied on Contractor's business letterhead." Addendum No. 3, p. 5. Among the specifications were bond requirements, including minimum ratings for companies writing the bonds: To be acceptable to the owner as surety for Bid Bonds, Performance Bond, and Payment Bonds, a surety company shall comply with the following provisions: 3. The surety shall have at least the following ratings: . . . 1,000,000 to 1,500,000 A Class XI Joint Exhibit No. 1, p. 00600.1. Addendum No. 2 "delete[d] the Class ratings" but not Best's Policyholder's Ratings. Although the copy of the invitation to bid that came in evidence as Joint Exhibit No. 1 lacked pages 00400.1 and 00400.2, the table of contents indicates that these pages contain a bid bond requirement. The proposal form also calls for a bid bond. In its proposed recommended order, moreover, petitioner states that the Board "set forth in its project manual a provision that bidders should submit a bid bond from a company with an 'A 11' rating." The Project Manual states, at page 00100.3, that a contract "will be awarded only to a responsible Bidder, qualified by experience . . . . " Joint Exhibit No. 1. Bidders were required to submit forms along with their bids which called for, among other things, lists of major construction projects in process and major projects completed in the last five years. Joint Exhibit No. 1, p. 00110.3. Compliance Attempted When, on the afternoon of June 10, 1993, Greg Cecil, Grubbs' general manager, arrived for the pre-bid conference, he was erroneously "instructed that Lakeview was at another site in Hernando." T.70. When he arrived there, "somebody on site . . . said . . . Lakeview Relocation is going to be moved to the site that you were previously at." Id. By the time he again reached his original, correct destination, he "ended up being late for the meeting." Id. It was about quarter of three and only Tom Williford, who is the Board's Director for General Services, and an electrical subcontractor remained. T.78. Mr. Williford recounted what had occurred before the other contractors had dispersed, and told Mr. Cecil "that there would be an addendum issue[d] reflecting any items that occurred that day." T.211. The Board's Addendum No. 2 lists Mr. Cecil as having been "in attendance at the Mandatory Pre-Bid Conference." Bids Submitted Grubbs, Caldwell and others submitted bids for Architect's Project No. 9129A. Grubbs' bid was low, at one million one hundred five thousand dollars ($1,105,000.00). Dated June 17, 1993, Grubbs' proposal offered to bring construction to substantial completion by July 13, 1993. In a blank for "Bond Rating," "A- 11" was inserted. Joint Exhibits No. 2 and 3.11. The bid documents contained no other rating information. A form bid bond executed by Grubbs' president and by Sandra McCullough, as attorney in fact both for Reliance Insurance Company, a Pennsylvania Corporation, and for Employees Reinsurance Corporation, a Missouri corporation, accompanied Grubbs' bid. Best rates the former company A- and the latter A++, evidence at hearing showed. The body of the bond begins: KNOW ALL MEN BY THESE PRESENTS, that we JOHN G. GRUBBS, INC. P.O. BOX 10262, BROOKSVILLE, FLORIDA 34601 as Principal, hereinafter called the Principal, and RELIANCE INSURANCE COMPANY AND EMPLOYERS REINSURANCE CORPORATION, P.O. BOX 945090 MAITLAND, FLORIDA 32751 a corporation duly organized under the laws of the State of PENNSYLVANIA as Surety, hereinafter called the Surety, are held and firmly bound unto SCHOOL BOARD OF CITRUS COUNTY . . . . Joint Exhibits Nos. 2 and 3. Attached to the bid is a power of attorney appointing Ms. McCullough attorney in fact for Reliance Insurance Company and another limited power of attorney appointing her attorney in fact for Employees Reinsurance Company, which authorizes her to execute "any bond . . . in co- suretyship with RELIANCE INSURANCE COMPANY." Id. Grubbs' bid included a list of five "open contracts" for amounts ranging from $98,749 to $1,362,252 for projects ranging from a water storage system to sanitary sewer installation to road construction; and a list of some 95 completed projects including roads, sewers, clearing, earthwork, a $53,387 reroofing job, and a $116,772 job installing a canopy and sidewalks for a middle school in Hernando County. Joint Exhibit Nos. 2 and 3. After the bids had been opened, John G. Grubbs told the Board's architect of still other projects Grubbs had completed. On July 1, 1993, a principal of the architectural firm the Board had engaged wrote Mr. Williford, as follows: Dear Tom: We have reviewed the bids received and would recommend that the low bid from John G. Grubbs, Inc. be rejected for being in non- conformance with the Bid Documents for the following reasons: The bid by John G. Grubbs, Inc. was submitted on a proposal form that contained an error in the completion date. Their form indicated construction to be completed by July 13, 1993; rather than 250 days as required by the Bid Documents, per addendum #3. Bid Bond received was written by a bonding company having a Best rating of "A minus" (A-). The Documents require an "A" rating. (Section 00600, Page 00600.1, Third Paragraph) The Contractor's Qualification form indicates that John G. Grubbs, Inc. has been in the Site and Drainage business for ten (10) years but has not constructed any School Facilities. It also shows having completed construction of only two buildings and one under construction. These 3 buildings are small fire stations in the $300,000 range each. Due to the above outlined concerns we would recommend the contract be awarded to Caldwell Construction Company, the next low bidder. Respondent's Exhibit No. 1. The Board met on July 8, 1993. During the meeting, one Board member opined, "the critical thing here is probably the bond rating." Id., p. 26. The Board voted to reject Grubbs' bid and, separately, to accept Caldwell's.

Recommendation It is, accordingly, RECOMMENDED: That the Board dismiss Grubbs' petition and award the contract for Architectural Project No. 9129-A to Caldwell. DONE AND ENTERED this 11th day of October, 1993, in Tallahassee, Florida. ROBERT T. BENTON, II Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 11th day of October, 1993. APPENDIX TO THE RECOMMENDED ORDER IN CASE NO. 93-4325BID Petitioner's proposed findings of fact are not separately numbered. Respondent's proposed findings of fact Nos. 1-11 and 14-19 have been adopted, in substance, insofar as material. With respect to respondent's proposed finding of fact No. 12, respondent's Mr. Williford concluded at the time that Grubbs had complied. Respondent's proposed finding of fact No. 13 pertains to a subordinate matter. With respect to respondent's proposed finding of fact No. 20, Grubbs built a canopy and sidewalks at a school. With respect to respondent's proposed finding of fact No. 21, both the bid rating and the completion date were deviations. Intervenor's proposed findings of fact Nos. 1-22, 25, 26, 27 and 28 have been adopted, in substance, insofar as material. Intervenor's proposed findings Nos. 23 and 24 pertain to subordinate matters. With respect to intervenor's proposed finding of fact No. 29, the completion date and bond rating were both deviations. COPIES FURNISHED: Carl E. Austin, Superintendent Citrus County School Board 1007 W. Main Street Inverness, Florida 34450-4698 Thomas S. Hogan, Jr. 20 South Broad Street Brooksville, Florida 34605 Richard S. Fitzpatrick 213 North Apopka Avenue Inverness, Florida 34450-4239 Clark S. Stillwell Post Office Box 250 Inverness, Florida 34451-0250

Florida Laws (1) 120.53
# 7
MID-STATE PAVING CO., INC. vs DEPARTMENT OF TRANSPORTATION, 08-004272BID (2008)
Division of Administrative Hearings, Florida Filed:Bartow, Florida Aug. 28, 2008 Number: 08-004272BID Latest Update: Jan. 29, 2009

The Issue Whether Respondent acted contrary to the agency's governing statutes, rules or policies, or the bid specifications in its proposed decision to award Contract No. T1285 to Intervenor Kamminga & Roodvoets, Inc. ("K & R").

Findings Of Fact Based on the oral and documentary evidence presented at the final hearing and on the entire record of the proceeding, the following findings of fact are made: On May 14, 2008, the Department released its bid solicitation for Contract T1285. The proposed contract was for the construction of a one-way pair through Lake Alfred, including new construction, reconstruction, milling and resurfacing, widening, drainage improvements, lighting, signalization, signing and pavement marking and landscaping on State Road 600 (U.S. 17/92). Polk County, the location of the project, lies in the Department's District 1. Qualified contractors, including Mid-State and K & R, received an electronic disk containing the solicitation, bid blank, plans and specifications for Contract T1285. The letting date for this project was June 18, 2008. Bids were to be submitted on or before that date via Bid Express, the electronic bidding system used by the Department. No party submitted a protest of the terms, conditions, and specifications contained in the solicitation pursuant to Subsection 120.57(3)(b), Florida Statutes. The work to be performed on Contract T1285 included the installation of limerock road base to be paid for in accordance with line item 0175, Optional Base Group 09 ("Base Group 09"). The bid documents included a set of "Supplemental Specifications." Section 6 of the Supplemental Specification was titled "Control of Materials." Subsection 6-3.3, titled "Construction Aggregates," provided as follows: "Aggregates used on Department projects must be in accordance with Florida Administrative Code Rule 14-103."2 Under the heading "Developmental Specifications" is a February 15, 2008, revision to the Construction Aggregates subsection that provides: Subarticle 6-3.3 (Page 54) is expanded by the following: 6-3.3.1 Department Directed Source for Aggregates: For this Contract, obtain aggregates for use in limerock base from the following vendor: Vulcan Construction Materials LP. Upon award of the Contract, provide the vendor and the Department a schedule of project aggregate needs. Once a schedule has been provided to both the Department and vendor, the Engineer will issue written authorization, with a copy to the vendor, for the purchase of aggregates from the vendor. This authorization is required before aggregates will be released by the vendor. Pick up the required aggregate such that the project schedule will be maintained. Payment to the vendor by the Contractor will be due upon receipt of the materials pursuant to the Department's Vendor Contract No. BDH50. This rate is the unit price agreed upon by the Department and the vendor and will be made available to bid proposal holders at the time of bid at http://www.dot.state.fl.us/construction/aggregate /aggregate.htm. The Department will make payment to the Contractor for the aggregates on progress estimates as a part of the bid unit price for the appropriate pay items. The rate is subject to change and adjustments for such changes will be made to the bid unit price of the appropriate pay items. Disputes with the vendor concerning aggregate supply will not be cause for Contract time adjustments, time suspensions or monetary adjustments to the Contract amount. The Contractor will be solely responsible for providing the necessary advance notice to the vendor and other coordination to obtain timely aggregate supply for the project. The import of Developmental Specification 6-3.3.1 was that all bidders would be required to obtain the limerock needed for Base Group 09 from a single vendor, Vulcan Construction Materials LP ("Vulcan"). The winning bidder would agree to pay Vulcan in accordance with a separate contract negotiated between Vulcan and the Department. The hyperlink provided in Developmental Specification 6-3.3.13 led to a document called "Aggregate Guidance" produced by the Department's State Construction Office. The front page of the Aggregate Guidance document contained "Bidder Information" consisting of a spreadsheet setting forth the Vulcan price per ton for limerock base and limestone coarse aggregate, with the price varying depending on the date and port of delivery. Between January and June 2008, the Vulcan price per ton for limerock base from both the Port of Tampa and Port Canaveral was $16.93. The Aggregate Guidance page contained additional hyperlinks with the following titles: "Aggregate Vendor Contract Usage," "Aggregate Vendor Contract," "Aggregate Vendor Projects List," "Aggregate Vendor Authorization Letter," "Aggregate Vendor Contract Frequently Asked Questions," and "Aggregate Price Adjustment Sheet." Alvin Mulford is the vice-president of Mid-State who, along with his estimator, put together his company's bid for Contract T1285. Mr. Mulford testified that his company has been bidding on Department work, and that he has never before seen a provision similar to Developmental Specification 6-3.3.1. Mr. Mulford directed his estimator to obtain clarification from the Department, to be sure that the bidders were required to purchase the limerock base from Vulcan. One reason for Mr. Mulford's concern was the "exorbitant" rate charged by Vulcan in comparison to other vendors. The restriction to a single supplier was so abnormal, and that supplier's rate was so out of line with the market, that Mr. Mulford decided to seek guidance from the Department through the question and response internet bulletin board provided by the Department for its projects. The question posed by Mid-State was as follows: Does the contractor have to use Vulcan materials for the limerock base at a rate of $16.93 per ton as stated in the Developmental Specifications 6-3.3.1? If so from which location is the material to be picked up? Is it also true that payment to the vendor (Vulcan Materials) will be due immediately upon receipt of the materials? I wanted to clarify this issue as it is unusual for the contractor to be limited to the use of only one vendor. The Department's response was as follows: The unit rate for the Material can be found at the following website: http://www.dot.state.fl.us/construction/ Aggregate/Aggregate.htm Pickup locations for the Material can be found at the following website: http://www.dot.state.fl.us/construction/ Aggregate/Aggregate.htm Payment should be issued by the Contractor to the Vendor (Vulcan Construction Materials LP) upon receipt of the materials as defined in Developmental Specification 6-3.3.1. Because the Department's response did no more than redirect him to the Department's website, Mr. Mulford decided to look at the website in more detail. He investigated the hyperlinks, including the Vulcan contract with the Department. When he clicked on the hyperlink titled "Aggregate Vendor Contract Usage," he found a document that provided as follows, in relevant part: Aggregate Vendor Contract Usage by Districts With the execution of the contract with Vulcan Construction Materials LP, contract number BDH50, Vulcan has committed to provide aggregate in the types and quantities defined in the contract (attached). The process for this contract in Districts 1, 5, and 7, is as follows: Include in the projects identified in the attached spreadsheet the appropriate special provision beginning with the July 2007 lettings. The District Specifications Engineer and District Construction Office will need to coordinate this effort. There are two special provisions for the purpose of notifying construction contract bidders of the Department's intention toward the aggregate. The first special provision is the mandatory version that will direct the bidder to obtain aggregates for the specified work from Vulcan. The second special provision provides the bidder an option to obtain its aggregates from Vulcan. * * * After these projects have been awarded, the contractor is required to notify FDOT and Vulcan a schedule of its aggregate needs for the project. After receiving this schedule, FDOT's Resident Engineer will issue written authorization to the contractor, with copy to Vulcan. This authorization is required before Vulcan will release aggregate to the contractor. Payment to Vulcan will be from the contractor. FDOT will pay cost of aggregate on progress estimates as part of the contractor's bid price for the work. The contractor is required to include in its bid price for the work the cost of the aggregate at the Vulcan rate. The Vulcan rate will be posted on the FDOT State Construction Website showing the rate. When adjustments are made to the Vulcan rate, FDOT will make adjustments in the construction contract unit price. . . . (Emphasis added.) Mr. Mulford testified that he understood the underscored language in the hyperlinked document to be a directive to the bidders and therefore a mandatory requirement of the bid specifications. He did not ask the Department for further clarification because he believed the requirement was clearly stated in the hyperlinked document. David Sadler, the director of the Department's office of construction, testified that the hyperlinked document was developed by his office to offer guidance to the districts as to the concept behind and use of the aggregate vendor contract. The document was not a part of the bid solicitation document. Mid-State's bid price was $7,429,398.44. Mid-State's price for Base Group 09 was $619,645.80, or $19.30 per square yard. This price reflected the Vulcan rate for limerock base of $16.92 plus tax and Mid-State's costs for the work associated with Base Group 09. 19. K & R's bid price was $7,370,505.24, or $58,893.20 lower than the bid price of Mid-State. K & R's price for Base Group 09 was $256,848.00, based on a stated unit price of $8.00 per square yard for limerock base. K & R's price for Base Group 09 was $362,797.80 lower than that of Mid-State, accounting for more than the differential between the overall bids of Mid-State and K & R. Marcus Tidey, Jr., K & R's vice president in charge of its Florida division, testified that K & R was well aware that the Vulcan price for limerock base was $16.93, and that K & R understands its obligation to pay that price to Vulcan should K & R be awarded Contract T1285. Mr. Tidey testified that at the time of bid submission, he cut K & R's bid price to $8.00 per square yard as a competitive strategy to win the contract. Mr. Tidey made a conscious decision that K & R would absorb the difference between $8.00 bid price and the Vulcan price of $16.93. Mr. Tidey testified that K & R needed to win this job in order not to have its crews and equipment sit idle during the economic downturn, and therefore decided to take all of its markup, roughly $250,000, out of the bid. He could have made the $250,000 cut on any item or items in the bid, but decided on Base Group 09 because the limerock base was a big item and therefore easy to cut by a large amount. Mr. Tidey also testified that the contract provides a $400,000 incentive payment for early completion of the job, meaning that K & R will be able to work "faster and smarter" and make up for the price reduction at the end of the job. Mr. Tidey testified that he obtained the Vulcan prices from the Department's website as instructed by Developmental Specification 6-3.3.1. He did not click on the hyperlinks, which appeared to reference the contract between the Department and Vulcan and therefore was of no concern to him. The Department and K & R dispute Mid-State's assertion that the underscored language of the hyperlink set forth in Finding of Fact 15 was a requirement of the bid specifications, based on Mr. Sadler's direct testimony and the underlying illogic and unfairness of requiring bidders to seek out hidden specifications. The Department and K & R concede that if the bid specifications did in fact require the bidders to include in Base Group 09 the full costs associated with obtaining the limerock base from Vulcan, then K & R's bid is nonresponsive. Developmental Specification 6-3.3.1 directed bidders to the Department's webpage for the purpose of obtaining the current Vulcan rate quote. It did not instruct the bidders to investigate the hyperlinks or to assume that the information contained therein was mandatory. Absent an instruction to bidders to review the information contained in the hyperlinks, the Department could not make such information mandatory without placing less curious bidders at a competitive disadvantage. The Department had no intent to play hide-and-seek with the bid specifications in the manner suggested by Mid-State. In addition, K & R points to three line items of the bid specifications in which the Department eliminates competition, instructing the bidders not to bid and inserting a fixed unit price and bid amount for all bidders as to those items. K & R reasonably asserts that the Department was fully capable of treating Base Group 09 in the same fashion, had it intended to require the bidders to pass through to the Department all the costs associated with obtaining the limerock base from Vulcan. However, the Department supplied the bid quantity (31,106 square yards) and left it to the bidders to determine the price per unit they would bid. K & R's bid was responsive. Nothing in the bid specifications prevented K & R from absorbing part of the cost of the Vulcan limerock base and passing the savings on to the Department, or required bidders to pass on to the Department the full costs of complying with the bid specifications regarding Base Group 09. The sole remaining issue is whether K & R's bid, though facially responsive, was materially unbalanced. The Department routinely conducts reviews of bid line items that appear "unbalanced," i.e., for which there appear to be significant differences between the price bid and the Department's cost estimate, in order to determine whether the price difference is due to a quantity error by the bidder. The Department's review confirms that the bid quantity specified on the bid blank is accurate. If a quantity error is found, the bids are recalculated using the bidders' unit prices and the correct quantities to determine whether the bid rankings would change. A bid for which there is a discrepancy between the bid and the Department's estimate is termed "mathematically unbalanced." A mathematically unbalanced bid that affects the ranking of the low bid is "materially unbalanced." A mathematically unbalanced bid is acceptable, but a materially unbalanced bid affords the bidder an unfair competitive advantage and must be rejected. The Department followed its usual procedure in analyzing the K & R bid to determine whether it was unbalanced. Philip Gregory Davis, the Department's state estimates engineer, testified that there were some unbalanced items in the K & R bid, but no quantity errors that would have changed the ranking of the bids. Richard Ryals, the project designer who conducted the unbalanced bid review, testified that the quantities were correct for Base Group 09. As noted above, K & R's low bid for Base Group 09 was an intentional strategy, not the result of a quantity error. K & R's current bonded capacity qualification with the Department is $258 million in contracts at any one time. K & R posted a bid bond, and has more than enough capacity to comfortably perform this contract. There is no economic danger to the Department in accepting K & R's low bid.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law set forth herein, it is RECOMMENDED that the Department of Transportation enter a final order dismissing Mid-State's formal written protest and awarding Contract T1265 to K & R. DONE AND ENTERED this 9th day of January, 2009, in Tallahassee, Leon County, Florida. S LAWRENCE P. STEVENSON Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 9th day of January, 2009.

Florida Laws (3) 120.569120.57893.20 Florida Administrative Code (2) 14-103.00114-103.002
# 8
RANGER CONSTRUCTION INDUSTRIES, INC. vs DEPARTMENT OF TRANSPORTATION, 92-001538BID (1992)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Mar. 05, 1992 Number: 92-001538BID Latest Update: Jul. 27, 1992

The Issue The issue for consideration in this case is whether the Department of Transportation's (hereinafter "Department") declaration that the bid of Ranger Construction, Inc. (hereinafter ("Ranger") was materially irregular and therefore unresponsive to an invitation to bid on contracts in highway construction projects 93110-3539, 3543, 3525, on State Road 80, (Avenue E), in West Palm Beach, Florida.

Findings Of Fact On December 4, 1991, both Petitioner, Ranger, and Intervenor, Community, submitted bids for job numbers 93110-3539, 93110-3542, and 93110-3525, for a construction project on State Road 80, (Avenue E), in Palm Beach County. Petitioner's bid was in the total amount of $2,554,390.37, and Intervenor's was in the total amount of $2,557,071.42. On the basis of those figures, Petitioner was the apparent low bidder. Bid specifications incorporated in all this agency's bids indicate that a bid may be rejected for irregularities. The term, "material" is not used in that specification. When bids are opened, agency procurement officials look at each bid to insure that any award is based on balanced bids containing all appropriate signatures and other requirements, and in the event of an irregularity, a decision is made on the question of whether any irregularity is material in that specific contract. This decision, made by the Awards Committee, is whether the irregularity is material enough to declare the questioned bid unresponsive and award the contract to the next lower bidder. When bids are first opened at the Department auditorium, they are checked to see if the bid bond or a cash or cash equivalent alternative is present. Then the figures are read off and recorded. The bids are then taken back to the contracts office and safeguarded until the minority business enterprise office looks at them. When this is done, the bids are then passed out to the checkers for examination. This more detailed review of the bids submitted revealed that Ranger's bid bond form, though attested to by the corporate secretary, and executed by George H. Friedlander, Agent for the bonding company, United States Fidelity and Guaranty Company, did not bear the signature of either Ranger's president or vice president. This is considered by Department representatives as being a requirement of a responsive bid. Community's bid bond was properly signed and attested to, and bore the signature of the agent for Reliant Insurance Company, the surety. Community failed to put the company name on the certificate of non- collusion, but in light of the fact that the certificate was signed by the president and was attached to other Community documents, it was identifiable as a part of that bid. In addition, further review of Ranger's bid revealed that on item 630-1- 12 of the computerized price breakdown, certain conduit was listed with a unit price of $621.00 per linear foot. The computer disc furnished to the bidders by the Department, which was used to compute the pricing breakout, reflected 38 linear feet of this conduit would be required. The price of $621.00 per foot on the bid form was in error, however. It should have been $6.21 per linear foot. The error occurred when Ranger's representative punched in the typographically incorrect figure, a clearly clerical error, at the time the bid forms were being completed. This was done, according to Mr. Slade, Ranger's vice president and the person responsible for the bid preparation, in the press of last minute preparation in a motel room in Tallahassee, under less than optimum circumstances. Notwithstanding the fact that this was a clerical error which was not caught by any Ranger official on review of its bid prior to submittal, Department officials considered the use of that large figure made Ranger's bid "unbalanced." This defect, plus the failure of the bid bond to be signed by Ranger's president or vice-president, were both considered to be material deviations by the members of the Department's technical review committee which, based on those deviations, recommended to the Department's Contract Award Committee that Ranger's bid be declared unresponsive. This was notwithstanding the fact that even with the incorrect pricing for the amount of the conduit stated on the Department's discs, Ranger's bid was still low. It must be noted, however, that the 38 linear foot quantity of conduit listed in the Department's discs was an incorrect amount. The project plans, furnished to all bidders prior to the bid process, reflected, in the breakdown of specifications, that the correct amount was 97 linear feet of conduit required. When Ranger's incorrect price of $621.00 per foot was applied to the actual footage required, the result was a bid figure for Ranger which was substantially higher than that submitted by Community and, therefore, caused a reversal in the order of the bidders. The Department applies a deviation standard of 7% to flag bids for more careful scrutiny. Here, the $621.00 item price was clearly in excess of that standard. As will be seen below, Ranger was not the only party to make a mistake in this procurement. The Department's discs erroneously reflected the quantity of conduit required at 38 feet when the actual amount called for was 97 feet. There is a difference, however, between the Department changing its specifications, as would be the case here, and the bidder correcting a unit price after opening. The Department can but the bidder can't. The bid documents, furnished to each prospective bidder, reserve the Department's right to make changes. Though the evidence indicates that it was not unknown in the past for Department officials to call a bidder for clarification of an unclear point in its bid, prior to bid award in this case, even though the pricing of the conduit was, at a figure almost 100 times the average/estimate of $7.30 per foot, no call was made to Ranger by any Department official to insure that the stated figure was the intended figure for inclusion. Mr. Griner, upon inquiry by the Hearing Officer, indicated that though while not usual, such an intentional inflation was not unknown to happen in bidding on Department contracts. No specific cases were cited, however. The evidence also indicates that this particular item was not the only item the Department considered to be unbalanced. There were three others in Ranger's bid, but this one was the only one which was felt to be inappropriate. By the same token, Community's bid also contained several items considered to be unbalanced, but they were not considered to be in the disqualifying category that the conduit price in Ranger's bid was in. Unbalanced bids are considered bad by the Department because, if successful, they allow the contractor to recoup or receive a larger portion of the contract price at the beginning of the contract term thereby making it less disadvantageous for him to walk away from the contract and making agency control over the contractor more difficult. Here, Mr. Slade unequivocally denies it was Ranger's intention to unbalance its contract for any purpose and claims it was no more than a clerical error in inserting the decimal point in the unit price when entered into the computer which resulted in the error. He claims that if he had been contacted by the Department when the obvious error was discovered, as he asserts, has been done in the past, he would have corrected it. It is clear that while query calls may have been made by the Department to bidders in the past, they were of a nature which did not affect the price of the contract. Ranger never received any notice from the Department about any problem with its bid. The first information Mr. Slade had of any problem with Ranger's bid came when his estimator made a routine call to the Department and was told of the problem with the unbalance. Thereafter Mr. Slade spoke with Mr. Newell to determine what route the subsequent proceedings would take. The Department contends, through the testimony of Mr. Newell and Mr. Griner, that it is Department policy to consider the failure to have a required signature on a relevant document to be grounds for declaring a bid non- responsive. Their testimony further reflects, however, that while the recommendations of the Technical Review Committee, (TRC), and the Contract Award Committee, (CAC), are uniformly to that effect, the Department Secretary has, on occasion, rejected such a recommendation and awarded a contract to a bidder whose bid did not contain a "required" signature. Consequently, it cannot be said to be Department policy to reject all bids containing an unsigned document since the Secretary, who as the agency head, sets agency policy, has acted inconsistent with such a "policy." Further, Mr. Morefield indicated that the Awards Committee could waive a failure of signature if it felt to do so was appropriate. To the best of his knowledge, however, that has not been done on this type of contract documents.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is, therefore: RECOMMENDED that the Department of Transportation enter a Final Order in this case dismissing the protest of Ranger Construction Industries, Inc., in regard to project Nos. 93110- 3539, 3543, and 3525 in West Palm Beach, Florida. RECOMMENDED in Tallahassee, Florida this 20th day of April, 1992. ARNOLD H. POLLOCK Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 20th day of April, 1992. APPENDIX TO RECOMMENDED ORDER IN CASE NO. 92-1538 BID The following constitutes my specific rulings pursuant to Section 120.59(2), Florida Statutes, on all of the Proposed Findings of Fact submitted by the parties to this case. FOR THE PETITIONER: I 1. - 5. Accepted and incorporated herein. II 1. - 6. Accepted and incorporated herein. & 8. Accepted and incorporated herein. Rejected as contra to the evidence. Accepted and incorporated herein. & 12. Accepted. 13. & 14. Accepted and incorporated herein. - 23. Accepted and incorporated herein. Accepted. - 31. Accepted. 32. - 41. Accepted and incorporated herein. 42. - 44. Accepted and incorporated herein. 45. - 48. Accepted and incorporated herein. 49. & 50. Accepted. - 53. Accepted. Accepted and incorporated herein. Accepted. Accepted and incorporated herein. Accepted. Rejected as not supported by the evidence. - 61. Accepted. & 63. Accepted. Accepted. & 66. Accepted. 67. & 68. Accepted. 69. Accepted to the extend that the correction is of mathematical calculations of the bid price - not corrections of pricing elements. 70. Accepted. 71. & 72. Accepted. 73. Accepted as a probability 74. Accepted. 75. & 76. Accepted. 77. Accepted. 78. Accepted. 79. Accepted and incorporated herein. 80. Accepted as to the Bond defect; rejected as to the pricing error. FOR THE RESPONDENT AND INTERVENOR: 1. & 2. Accepted and incorporated herein. - 6. Accepted and incorporated herein. Accepted. Accepted. Accepted and incorporated herein. 10. & 11. Accepted. 12. - 14. Accepted. 15. Accepted and incorporated herein. 16. - 19. Accepted and incorporated herein. 20. - 22. Accepted. 23. - 26. Accepted and incorporated herein. 27. - 30. Accepted. 31. - 33. Accepted and incorporated herein. 34. & 35. Accepted and incorporated herein. Not a Finding of Fact but a summary of testimony. & 38. Accepted. Irrelevant and not related to basis for denial. - 42. Accepted and incorporated herein. & 44. Accepted and incorporated herein. First and Second sentences accepted. Balance accepted and incorporated herein. & 47. Accepted and incorporated herein. 48. Accepted and incorporated herein. COPIES FURNISHED: Susan P. Stephens, Esquire Department of Transportation 605 Suwannee Street, MS 58 Tallahassee, Florida 32399-0450 Douglas S. Roberts, Esquire 123 S. Calhoun Street Tallahassee, Florida 32314 Mary M. Piccard, Esquire 1004 DeSoto Park Drive Tallahassee, Florida 32302-0589 Ben G. Watts Secretary Department of Transportation Haydon Burns Building 605 Suwannee Street Tallahassee, Florida 32399-0450 Thornton J. Williams General Counsel Department of Transportation Haydon Burns Building 605 Suwannee Street Tallahassee, Florida 32399-0450

Florida Laws (2) 120.57120.68
# 9
IN-REL ACQUISITIONS, INC. vs DEPARTMENT OF CORRECTIONS, 93-003438BID (1993)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Jun. 22, 1993 Number: 93-003438BID Latest Update: Oct. 26, 1993

The Issue This is a bid challenge case in which the primary issue is whether the Petitioner's bid is responsive to the RFP.

Findings Of Fact Some basic background facts The Department issued Request for Proposals No. 700:0652, Office Space (the "RFP"). The RFP requested bidders to submit proposals to provide 7,750 square feet of office space (+/- 3 percent) in Broward County to be leased by the Department for a probation and parole office. Under the RFP terms the space had to be available by June 1, 1993. Proposals had to be filed with the Department by January 5, 1993. In-Rel Acquisitions, Inc., and Janc, Inc., submitted bids. Pursuant to an evaluation of the bids conducted by the Department, In- Rel Acquisitions, Inc., was given a contingent award of the lease on March 31, 1993, as the vendor with the lowest price and the overall highest evaluation score. The contingent award letter of March 31, 1993, read as follows in pertinent part: It is the intent of the Department of Corrections to award the above referenced bid to In-Rel Acquisitions, Inc., as the vendor with the lowest bid price and the overall highest evaluation score. The award to In-Rel Acquisitions, Inc., is contingent upon: (a) obtaining the necessary zoning approval to operate a probation and parole office at the bid premises by May 6, 1993, and (b) the Department obtaining sufficient assurances from the Resolution Trust Corporation that the bid premises will not be taken over by the RTC and the Department's leasehold interest will not be affected. On May 18, 1993, the Department issued a letter awarding the subject lease to Janc, Inc., because the Department was of the view that In-Rel Acquisitions, Inc., had not met the conditions of the contingent award of March 31, 1993. The award letter of May 18, 1993, read as follows, in pertinent part: This letter is to inform you that the Department of Corrections has determined that the award of the lease for the above referenced bid is hereby made to Janc, Inc. The bid from In-Rel Acquisitions, Inc. has been rejected because it has not met either of the conditions stipulated on the March 31st award letter, and the property has not been properly maintained under the existing lease agreement. Both the contingent award letter of March 31, 1993, and the award letter of May 18, 1993, contained "boiler-plate" language advising the addressee of the basic details of the written protest process. In-Rel Acquisitions, Inc., filed a timely protest of the award to Janc, Inc. Facts about the zoning situation The award of the lease to In-Rel Acquisitions, Inc., was made contingent because the property was not properly zoned to support a probation and parole office for the Department. At the time of soliciting bids on the subject project, the Department was currently leasing the space proposed by In-Rel Acquisitions, Inc., and had done so for almost five years. Shortly after the deadline for the submission of bids, the Department was notified that it was in violation of the Plantation City Code because the office was not properly zoned, and the Department was subject to fines if it did not obtain proper zoning or leave the premises by June 1. The fine was at the rate of $200.00 per day. In-Rel Acquisitions, Inc., did not obtain necessary zoning approval by May 6, 1993. First, the zoning approval passed by the City of Plantation limited the hours of operation of the probation office. As approved by the City of Plantation, the Department can only operate its probation office Monday through Friday from 8:00 a.m. to 5:30 p.m., plus one evening a week until 7:00 p.m. These time limits do not satisfy the contingency placed in the March 31, 1993, award because the Department cannot operate a probation and parole office within these limited hours. The Department has 14,000 probationers in Broward County under its supervision. The caseload puts a severe strain on the caseworkers making it essential that they have flexible hours to get their job done. The caseload also requires working evenings and weekends. For example, some probation officers must maintain evening hours to test offenders for drugs. Although the officers could make the offenders visit the Department's office during the day, this would jeopardize the employment status of many offenders. Therefore, the Department needs flexible evening hours to do the drug testing. One of the major functions of the probation officer is to help rehabilitate the offender. That means that the Department must do what it can to help the offender stay employed. In addition, the probation officers need evening and weekend hours to do their paperwork, including preparing weekly reporting schedules, and recording their contacts. The officers also need evening hours to receive monetary payments due from offenders, meet with offenders who must report in person into the office each month, and counsel offenders in the office. Under the prior lease with In-Rel Acquisitions, Inc., the Department had operated and held evening hours at a minimum of three nights per week. This included both probation officers and offenders appearing at the office during the evenings. The RFP specifically notified bidders that there would be evening hours. Section B(14) of the RFP states: Staff of both sexes will be required to work in this facility during both daylight and evening hours. An environment in which staff can expect to be safe is essential. Section D(11) of the General Provisions of the subject RFP reads as follows: Federal, state, county, and local laws, ordinances, rules, and regulations that in any manner affect the items covered herein apply. Lack of knowledge by the bidder will in no way be a cause for relief from responsibility. The records of the City of Plantation meetings show that the May 5, 1993, vote was not final. A mandatory second reading of the zoning change took place on May 12, 1993, and the minutes were approved on May 19, 1993, and June 2, 1993, with respect to the first and second reading. Even if the zoning change with its limited hours had been sufficient to meet the terms of the contingent award, the limited zoning approval was not received before May 6, 1993; and therefore, the mandatory second reading of May 12, 1993, caused the limited zoning approval to be untimely. Finally, the limited and untimely zoning change as approved on May 5, 1993, was itself contingent on satisfying all concerns of the Landscape Architect. Facts regarding the RTC assurances The second award contingency required In-Rel Acquisitions, Inc., to provide the Department with sufficient assurances from the Resolution Trust Corporation (RTC) that the bid premises would not be taken over by the RTC and that the Department's leasehold interest would not be affected. The property submitted by In-Rel Acquisitions, Inc., was in litigation; the RTC as successor mortgagee, had filed or secured a Notice of Lis Pendens, an Amended Complaint, a Summary Final Foreclosure Judgment, and a Notice of Sale. The RTC has an interest in the property offered by In-Rel Acquisitions, Inc. Paragraph 1(E) of the Summary Final Foreclosure Judgment provides that the Summary Final Foreclosure Judgment shall eliminate the interest of anyone that has acquired an interest since the filing of the Lis Pendens, including the Department's leasehold interest if it were to enter into a lease on the property. The property bid by In-Rel Acquisitions, Inc., was subject to a second mortgage. The record does not reflect that the first mortgagee and the second mortgagee entered into any type of written agreement not to disturb the leasehold interest of the Department. By letter dated May 11, 1993, an attorney for the RTC responded to the Department's request for assurances. The May 11, 1993, letter included the following: Pursuant to your request of yesterday, I am writing to belatedly confirm the April 19, 1993 telephone conference had you, Robert Gellman of Real Estate Recovery, Inc., and I. This telephone conversation was had to provide the Department of Corrections (the "Department") with the assurances requested from the RTC in the Department's March 31, 1993 letter of intent to award the subject least [sic] to In Rel Acquisitions, Inc. During this discussion you expressed the concern of the Department that the RTC intended to take title to the property and would then utilize special powers and privileges to dispossess the Department. If that were to be the case, you indicated that the Department would want an assurance that it would receive 90-days' notice before it could be dispossessed. (You indicated that 90-days is how long it would take to complete the bid process that would have to precede the Department's move.) Robert Gellman indicated that he was pursing [sic] numerous resolutions to the pending litigation, some of which might involve the RTC's taking title to the property and others which might not. Mr. Gellman assured you, however, that the RTC perceived it to be in its own best interest, and in the interest of any subsequent landlord, that the Department be kept happy and its tenancy undisturbed. Mr. Gellman also explained that he could not agree to anything at the time, as the appropriate committee approval had to be secured, but that he anticipated no problem in obtaining the necessary approvals of any writing consistent with our discussions once those writings were prepared. (I believe at the time we contemplated a written lease and a written assurance letter from the appropriate RTC official.) You indicated that your concerns had been satisfied and that these assurances were sufficient to satisfy the Department. The three of us discussed that it would not make sense to begin drafting anything at that time as the issues regarding the property's zoning still had to be cleared up and our efforts might otherwise "be all for not." Accordingly, it was mutually decided that we would wait to see the outcome of the May 5, 1993 hearing on the zoning issue before proceeding further. In the interim you indicated that you would be providing us with a list of the specific items of tenant improvements that your local officials expected to have made to the property. (We received this list on May 3, 1993.) On May 5, 1993 the Plantation City Council approved In-Rel Acquisition Inc.'s, request for a rezoning of its property and for a "special use" condition by a 4-0 vote, thus effectively resolving the zoning issue. Yesterday you and I spoke on this issue and discussed the situation. I indicated that the RTC is now in a position to provide you with written assurance that it has no intention of dispossessing the Department or interfering with its lease tenancy (either under the old or the new lease), and that the Department's leasehold interest would not be affected by the RTC taking title to the property (if it ever does). I asked and you indicated that this would give you what you needed and everything would be fine. In addition, I indicated that once the lease by and between the Department and In Rel is finalized, the RTC, if it still owns the note and mortgage, would be able to approve same. In light of the foregoing your call to me this morning, indicating that the Department had decided to withdraw its award to In Rel Acquisitions, Inc. and make the award to "Viloci" (phonetic(?), the next ranked bidder. During this discussion you indicated that Viloci's legal counsel had stated that the RTC would never be able to provide the Department with the requisite assurances. It is unfair for you to make decisions based in whole or in part on any statements made by Viloci's counsel regarding what the RTC can and cannot do without giving us an opportunity to respond -- especially in light of your indications on April 19th and again yesterday that the Department was satisfied with the RTC. The record reflects that the "Notice of Sale" failed to contain language providing that the property would be sold subject to any leasehold interest, either previously or subsequently acquired.

Recommendation On the basis of all of the foregoing, it is RECOMMENDED that a Final Order be issued in this case dismissing the Petition of In-Rel Acquisitions, Inc., and awarding the subject lease to the Intervenor, Janc, Inc. DONE AND ENTERED in Tallahassee, Leon County, Florida, this 17th day of September 1993. MICHAEL M. PARRISH Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 17th day of September 1993. APPENDIX TO RECOMMENDED ORDER, CASE NO. 93-3438BID The following are the Hearing Officer's specific rulings on all proposed findings of fact submitted by all parties. Proposed Findings of Fact submitted by Petitioner Paragraph 1: First three sentences accepted in substance. Fourth sentence rejected as constituting primarily irrelevant or subordinate details. Last sentence reject as contrary to the greater weight of the evidence to the extent it is intended to imply that the zoning change obtained was sufficient. Paragraph 2 and 3: Rejected as contrary to the greater weight of the evidence. Paragraphs 4 and 5: Accepted in substance. Paragraph 6: The first two sentences are rejected as irrelevant or as subordinate and unnecessary details. Last sentence rejected as irrelevant and also as contrary to the greater weight of the evidence and as suggesting implications not warranted by the evidence. Paragraph 7: Rejected because it goes further than the evidence and suggests inferences not warranted by the evidence. Messrs. Gellman and Guerra told Mr. Ferst that they did not expect that the Department would have any problems with RTC, but the statements of Messrs. Gellman and Guerra stopped short of making any guarantees or of binding the RTC. Paragraph 8: Rejected as contrary to the greater weight of the evidence. Paragraph 9: Accepted in substance, with the deletion of the words "in ignoring the foregoing." Paragraph 10: Rejected as constituting a summary of a party's argument or statement of position, rather than a proposed finding of fact. Paragraph 11: First sentence is accepted in substance. Second sentence is accepted as literally true, but as also substantially irrelevant because during most of the original five-year lease there was no issue about hours of operation because there was no effort at restriction of hours of operation. The last sentence is rejected as not supported by persuasive competent substantial evidence. Paragraph 12: The first two sentences are rejected as constituting a summary of a party's argument or statement of position, rather than a proposed finding of fact. The third and fourth sentences are rejected because they go further than the evidence and suggest inferences not warranted by the evidence. As noted above, Messrs. Gellman and Guerra told Mr. Ferst that they did not expect that the Department would have any problems with RTC, but the statements of Messrs. Gellman and Guerra stopped short of making any guarantees or of binding the RTC. Paragraph 13: Rejected as constituting argument or proposed conclusions of law, rather than proposed findings of fact. Paragraph 14: First two sentences accepted in substance. Last sentence rejected as constituting argument or proposed conclusions of law, rather than proposed findings of fact. Paragraph 15: Rejected as constituting argument or proposed conclusions of law, rather than proposed findings of fact. Paragraph 16: It is accepted that Messrs. Gellman and Guerra made statements as to what they expected the RTC's position to be, but, as noted several times above, the statements of Messrs. Gellman and Guerra stopped short of making any guarantees or of binding the RTC. Proposed findings submitted by Respondent Paragraphs 1, 2, 3, 4, 5, 6, 7, 8 and 9: Accepted. Paragraph 10: Rejected as constituting subordinate and unnecessary restatement of a party's position. Paragraphs 11, 12 and 13: Accepted in substance. Paragraph 14: Rejected as repetitious. Paragraphs 15, 16 and 17: Accepted. Paragraph 18: First sentence is accepted. The second sentence is rejected as constituting argument, rather than proposed findings of fact. Paragraphs 19, 20, 21, 22, 23, 24, 25, 26, 27 and 28: Accepted in substance. Paragraph 29: Rejected as constituting argument or proposed legal conclusion, rather than proposed findings of fact. Paragraph 30: Accepted. Paragraph 31 and 32: Rejected as constituting argument or proposed legal conclusion, rather than proposed findings of fact. Paragraphs 33 and 34: Accepted in substance. Paragraphs 35 and 36: Rejected as irrelevant or as subordinate and unnecessary details. Paragraph 37: Rejected as constituting argument or proposed legal conclusion, rather than proposed findings of fact. Paragraphs 38, 39, 40 and 41: Rejected as irrelevant or as subordinate and unnecessary details. Paragraphs 42, 43, 44 and 45: Rejected as constituting argument or proposed legal conclusion, rather than proposed findings of fact. Paragraphs 46, 47, 48 and 49: Accepted in substance. Paragraph 50: Accepted. Paragraph 51: Rejected as constituting argument or proposed legal conclusion, rather than proposed findings of fact. Paragraph 52: First sentence rejected as subordinate and unnecessary details. Second sentence rejected as repetitious. Paragraphs 53, 54 and 55: Rejected as constituting argument or proposed legal conclusion, rather than proposed findings of fact. Paragraph 56: First sentence accepted in substance. Second sentence rejected as constituting argument, rather than proposed findings of fact. Paragraph 57: Accepted in substance. Paragraph 58: Rejected as irrelevant or as subordinate and unnecessary details. Paragraphs 59, 60, 61, 62, 63 and 64: Rejected as primarily constituting argument or proposed legal conclusion, rather than proposed findings of fact. Proposed findings submitted by Intervenor Although there are some differences in the numerical sequence, the vast majority of the proposed findings of fact submitted by the Intervenor are identical to those submitted by the Respondent. It would serve no useful purpose to repeat the rulings on all of those findings. The following rulings address the few proposed findings submitted by the Intervenor that are different from the ones submitted by the Respondent. Paragraph 11: Rejected as constituting subordinate and unnecessary restatement of a party's position. Paragraph 30: Rejected as constituting argument or proposed legal conclusion, rather than proposed findings of fact. Paragraph 37: Rejected as irrelevant or as subordinate and unnecessary details. Paragraph 44: Rejected as constituting argument or proposed legal conclusion, rather than proposed findings of fact. Paragraph 54: Rejected as constituting argument or proposed legal conclusion, rather than proposed findings of fact. Paragraphs 55, 56, 57, 58, 59 and 60: Accepted in substance. Paragraph 61: Rejected as constituting argument or proposed legal conclusion, rather than proposed findings of fact. Paragraphs 62, 63 and 64: Accepted in substance. Paragraphs 65, 66 and 67: Rejected as constituting argument or proposed legal conclusion, rather than proposed findings of fact. COPIES FURNISHED: Michael S. Riley, Esquire 200 East Las Olas Boulevard, Suite 1400 Fort Lauderdale, Florida 33301 Steven S. Ferst, Esquire Assistant General Counsel Department of Corrections 2601 Blair Stone Road Tallahassee, Florida 32399-2500 Joseph J. Villacci, Esquire 315 Northeast Third Avenue, Suite 200 Fort Lauderdale, Florida 33301 Harry K. Singletary, Jr., Secretary Department of Corrections 2601 Blair Stone Road Tallahassee, Florida 32399-2500 Louis A. Vargas, General Counsel Department of Corrections 2601 Blair Stone Road Tallahassee, Florida 32399-2500