Elawyers Elawyers
Ohio| Change
Find Similar Cases by Filters
You can browse Case Laws by Courts, or by your need.
Find 49 similar cases
NATIONAL WATER MAIN CLEANING CO vs DEPARTMENT OF TRANSPORTATION, 17-000589BID (2017)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Jan. 24, 2017 Number: 17-000589BID Latest Update: May 10, 2017

The Issue Whether Respondent’s intended action to award Contract No. E3Q37 to VacVision Environmental, LLC, for “Milton Operations Routine Maintenance,” is contrary to Respondent’s solicitation specifications.

Findings Of Fact The Department is an agency of the State of Florida tasked with procuring the construction of all roads designated as part of the State Highway System or the State Park Road System, or of any roads placed under the Department’s supervision by law. See § 334.044, Fla. Stat. (2016).1/ Further, the Department has the duty to ensure that maintenance of sewers within the right-of-way of the roadways within its jurisdiction does not degrade the integrity of its facilities. See § 337.401, Fla. Stat. Petitioner, National Water Main Cleaning Co., is a full- service maintenance and rehabilitation pipe contracting business based in New Jersey. The company has been in business since 1949 and primarily contracts with government entities to perform storm and sanitary sewer inspection, cleaning, and repair. On October 11, 2016, the Department published a bid solicitation notice for the Contract, seeking contractors to desilt, remove blockages from, and install liners in existing underground sewer pipe on a specified state road in Santa Rosa County. The ITB included specifications, plans, and a proposal form with specific work items. The ITB contained the following relevant language requiring a bid bond for proposals over $150,000: For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier’s check, trust company treasurer’s check, bank draft of any National or state bank, or a Surety Bid Bond made payable to the Florida Department of Transportation must accompany each bid in excess of $150,000.00. * * * Bid Bonds shall substantially conform to DOT Form 375-020-09 furnished with the Proposal. Surety2000 or SurePath electronic Bid Bond submittal may be used in conjunction with Bid Express internet bid submittal. For more information please visit https://www.surety2000.com [f]or Surety2000 or https://www.insurevision.com for SurePath. Paper Bid Bonds will also be accepted for bids submitted through Bid Express provided they are received prior to the deadline for receiving bids, by the locations(s) identified in the Bid Solicitation Notice for receiving bids for the advertised project(s). If an electronic bid bond is not being submitted, the bidder must submit an original bid bond. (A fax or copy sent as an attachment will not be accepted.) (emphasis added). The deadline for submission of bids was Thursday, November 10, 2016, at 2:00 p.m. On November 10, 2016, the Department received and opened bids from both Petitioner and Intervenor, as well as two other vendors. Petitioner’s bid for the project was the lowest at $504,380.70. Intervenor’s bid was the next lowest at $899,842. Petitioner submitted its bid for the project through Bid Express, the Department’s electronic bid submission website. Along with its bid, Petitioner submitted several attachments in a .zip file, including a .pdf copy of a bid bond from Traveler’s Casualty and Surety Company in the amount of 5 percent of the total amount of the bid. Petitioner did not submit an electronic bid bond through either Surety2000 or SurePath, nor did it submit the original paper bid bond prior to the deadline for submission of bids. The original paper bid bond remained in the possession of Petitioner’s President, Salvatore Perri, on the date of the final hearing. Petitioner’s bid was reviewed by employees of the Department’s District 3 Contracts Administration Office and deemed “non-responsive” because the bid bond submission did not comply with the bid specifications. On December 7, 2016, the Department posted its notice of intent to award the Contract to Intervenor. The .pdf copy of the bid bond Petitioner attached to its bid for the project was on Department form 375-020-09, Bid or Proposal Bond. Form 375-020-09 contains the following note: “Power of Attorney showing authority of Florida Licensed Insurance Agent to sign on behalf of, and bind, surety must be furnished with this form. Affix Corporate Seal of Surety.” The Power of Attorney accompanying Petitioner’s bid bond contains the following language: “Warning: THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER.” The attached Power of Attorney is a copy in black-and- white, rather than an original with the red border. Waiver Pursuant to the ITB, and by operation of section 120.57, Florida Statutes, the deadline to file a protest to the bid specifications was October 14, 2016, 72 hours after posting of the ITB. Petitioner did not file a protest to the specifications of the ITB.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that: Respondent, Department of Transportation, enter a final order adopting the Findings of Fact and Conclusions of Law set forth herein, and award Contract E3Q37 for Milton Operations Routine Maintenance, to Intervenor, VacVision Environmental, LLC. DONE AND ENTERED this 19th day of April, 2017, in Tallahassee, Leon County, Florida. S SUZANNE VAN WYK Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 19th day of April, 2017.

Florida Laws (7) 120.569120.57120.68334.044334.187337.40190.953
# 2
DAVID NIXON, INC. vs DEPARTMENT OF CORRECTIONS, 90-006278BID (1990)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Oct. 05, 1990 Number: 90-006278BID Latest Update: Jan. 15, 1991

The Issue The Department of Corrections sought bids for construction of a health services building for a correctional facility. A discrepancy existed between the written specifications and the architectural drawings for the project. An addendum was issued to clarify the matter. The low bidder (Intervenor) did not acknowledge receipt of the addendum until several hours after the opening of bids. The Department accepted the Intervenor's bid. The Petitioner timely protested the action. The issue in this case is whether, in accepting the Intervenor's bid, the Department acted contrary to the requirements of law.

Findings Of Fact On July 31, 1990, the Department of Corrections (hereinafter "Department") issued an Invitation To Bid ("ITB") for PR-35-JRA, Project #90015, consisting of the construction of a Health Classification Building at the Columbia County Correctional Institution. In relevant part, the ITB requested price proposals for said construction, provided that the bid would be awarded to the responsive bidder submitting the lowest cost proposal, provided that "in the interest" of the Department, "any informality" in bids could be waived, and provided space on the bid form for acknowledgment of receipt of all addenda to the ITB. Bids were to be filed no later than 2:00 p.m. on September 11, 1990, the time scheduled for bid opening. Documents issued with the ITB included architectural drawings and written specifications for the building. The architectural firm of Jim Roberson and Associates, (hereinafter "JRA") had been employed by the Department to prepare the drawings and specifications. JRA was responsible for preparation and distribution of related addenda. Further, a JRA representative presided over the opening of bids on behalf of the Department. Following release of the ITB and supporting documents, JRA became aware of a conflict between sink faucets required by the drawings and those required by the written specifications. The specifications provided that sink faucets operated by hand levers or foot pedals were to be installed in the facility. The architectural drawings JRA indicated that sink faucets were to operate by means of "electric-eye" activators, rather than by hand levers or foot pedals. On September 10, 1990, JRA issued an addendum (identified as Addendum #2) 1/ to clarify that "electric-eye" type operators were to be included in the bids. The addendum was sent by telephone facsimile machine to all anticipated bidders. In part the addendum provides as follows: "This Addendum forms a part of the Contract Documents and modifies the original Specifications and Drawings, dated 31 July 1990, as noted below. Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may subject the Bidder to Disqualification." On September 11, 1990, the eight bids submitted in response to the ITB were opened by the JRA representative. The Intervenor, Custom Construction (hereinafter "Custom"), submitted the lowest bid at $898,898. The Petitioner, David Nixon (hereinafter "Nixon"), submitted the next lowest bid at $900,000. The bid form provided by the Department as part of the ITB materials to prospective bidders provided space for acknowledgment of addenda to the ITB documents. Upon opening the bid submitted by Custom, the JRA representative officiating at the opening noted that the Custom bid failed to acknowledge Addendum #2 in the appropriate space on the bid form. 2/ Robert L. Harris, president of Custom Construction, attended the bid opening. When the JRA representative noted the lack of acknowledgment of Addendum #2, Mr. Harris stated that he was unaware of the addendum. At hearing, Mr. Harris testified that his secretary told him that Addendum #2 was not received by his office. The JRA representative testified that his review of JRA's FAX transmission records indicated that the FAXed Addendum #2 was received by all bidders. The greater weight of the evidence establishes that Addendum #2 was transmitted to and received by, all bidders. Upon leaving the bid opening, Mr. Harris immediately contacted his plumbing subcontractor, Jerry Stratyon, and discussed the situation. Approximately two hours after the bid opening, and after talking with Mr. Stratton, Mr. Harris notified JRA, in a letter transmitted by FAX machine to JRA, that his bid price did include plumbing fixtures required by Addendum #2. Mr. Harris concluded the letter, "[w]hen can we start work. I know you don't want the alternate." On October 8, 1990, JRA recommended to the Department, that the Custom bid be accepted. The letter of recommendation, in part, provides: The apparent low bidder however, did not verify receipt of Addendum No. 2 on the Bid Proposal. Our office did receive a, facsimile after the bid verifying Addendum NO. 2 receipt from the Contractor's Office." However, the actual letter from Custom to JRA states, not that Addendum #2 was received, but that it was included in the price bid by Custom's plumbing subcontractor. Both Nixon and Custom obtained plumbing bids from the same subcontractor, Jerry Stratton. The cost increase attendant to the requirements of Addendum #2 is approximately $2,400 over the plumbing fixtures indicated in the written project specifications. Mr. Stratton was aware of Addendum #2 and testified that the requirements of Addendum #2 were reflected in his price quotes to both bidders. Mr. Stratton provided the same price bid to Nixon and Custom. Mr. Stratton also provided bids to Nixon and Custom for HVAC work. Mr. Stratton was accepted as Custom's HVAC subcontractor. Nixon's bid indicates that another HVAC subcontractor will perform the cork should Nixon receive the contract. The ITB provided that bid modification or withdrawal was permitted on written or telegraphic request received from a bidder prior to the time fixed for opening. Mr. Harris did not attempt to either withdraw or modify Custom's bid prior to bid opening. No bid modification was permitted subsequent to the bid opening. The Department's policy is to waive minor irregularities when to do so would be in the best interests of the State and would not be unfair to other bidders. The evidence does not establish that Custom Construction's failure to acknowledge the addendum was purposefully designed to permit withdrawal of their bid subsequent to the public bid opening. The omission of acknowledgment of Addendum #2 provided Custom an opportunity to withdraw the bid that was not available to other bidders. Custom could have informed the Department that the bid price did not include the requirements of Addendum #2, and the bid could have been withdrawn. Custom was therefore provided with a substantial advantage or benefit not enjoyed by the other bidders. The other bidders, all of whom acknowledged receipt of Addendum #2, had no opportunity to, and would not have been permitted to, withdraw their aids. The fact that Custom did not withdraw the bid is irrelevant.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is hereby RECOMMENDED that the Department of Corrections enter a Final Order rejecting the bid submitted by Intervenor as nonresponsive and awarding the contract to the Petitioner. DONE and RECOMMENDED this 15th day of January, 1991, in Tallahassee, Florida. WILLIAM F. QUATTLEBAUM Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 15th day of January, 1991.

Florida Laws (4) 120.53120.57120.68255.29
# 3
TOXICOLOGY TESTING SERVICE, INC. vs DEPARTMENT OF CORRECTIONS, 92-001779BID (1992)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Mar. 19, 1992 Number: 92-001779BID Latest Update: Jun. 04, 1992

The Issue At issue in this proceeding is whether the decision of the respondent, Department of Corrections (Department), to award the subject bid to intervenor, Doctors and Physicians Laboratories, Inc. (Doctors), comported with the essential requirements of law.

Findings Of Fact Background On October 16, 1991, the Department of Corrections (Department) issued invitation to bid number 91-CO-5369 (hereinafter "the ITB"), which sought to secure appropriate services to perform drug tests on certain applicants for employment and existing employees of the Department. The deadline for submitting bids was established as 11:00 a.m., November 7, 1991. At the time of the deadline, the Department had received four bids, including those of petitioner, Toxicology Testing Service, Inc., and intervenor, Doctors and Physicians Laboratories, Inc. (Doctors). Petitioner's bid was $372,000, and Doctors' bid was $315,491.60. Based on its evaluation, the Department ranked Doctors first and petitioner second, with composite scores of 91.67 and 90.38, respectively, and proposed to award the contract to Doctors. Petitioner filed a timely formal written protest to contest the Department's decision, and charged that the Department materially departed from the evaluation criteria contained in the ITB. The Invitation to Bid Pertinent to this case, section 4.7 of the ITB established the evaluation criteria to be used in determining the acceptability of the bids as follows: 4.7 Evaluation Criteria Criteria Point Value 1. References 5 2. Firm Profile 5 3. Firms Qualifications 15 Understanding of Scope of Services 25 Bid Price 50 100 And, section 4.7.5 of the ITB established the following methodology to be utilized in awarding points for the bid price criteria: The award for bid price shall be determined as follows: The Bidder who submits the lowest bid price will be awarded 50 points. All others bidders will be awarded points based on the following formula: Bid Price Points = 50 X [1-A/B] where: A = the difference between the percentage of the bid being evaluated and the low bid(s). B = the low bid. The lowest bid price will be computed by multiplying the unit prices for Items 1, 2 and 3 for all three years by the estimated quantity. The estimated quantity is for bidding purposes only and is not a guarantee. The total annual cost for Items 1 and 2 for all three years will be added to determine the Total Cost for all three years. The vendor with the lowest Total Cost will be awarded the 50 points. Negative points will not be awarded. Pursuant to the provisions of section 5.13 of the ITB, the contract was to be awarded to the bidder that received the highest overall point total under the criteria established by section 4.7 of the ITB. The Department's evaluation and the protest Based on its evaluation of the bids, the Department's evaluation committee awarded petitioner 49.34 points for its technical proposal (items 1-4 of the evaluation criteria) and Doctor's 41.67 points for its technical proposal. Bid price points were then established through a preexisting computer program, which derived 41.04 points for petitioner and 50 points for Doctors. When totalled, petitioner received 90.38 points and Doctors received 91.67 points. Accordingly, the Department proposed to award the contract to Doctors. Petitioner filed a timely protest to contest such award. The gravamen of that protest is petitioner's contention that the Department applied a methodology other than that established by the ITB to derive the bid price points and that had it utilized the methodology established by the ITB petitioner would have received the most points and been the prevailing bidder. 1/ Consistent with petitioner's contention, the proof demonstrates that the computer program used to derive the bid price points and the methodology established by the ITB to derive such points differed with regard to the definition of A in the formula, discussed supra. In the computer program, factor A was defined as the difference between the price of the bid being evaluated and the low bid. In the ITB, factor A was defined as the difference between the percentage of the bid being evaluated and the low bid. The Department was not, however, aware of this dichotomy until the subject protest, believing that its ITB conformed with the methodology it had previously programed for its computer, and, at hearing, offered proof, which is credited, that use of the word "percentage" in the definition of A was a typographical error which should have read "price." Notably, the Department heavily weighed price (50%) in its ITB, and it is apparent the Department intended to use a formula that would create a difference in price scoring that was relative to any difference in the bid prices. Use of the formula, as correctly defined in its computer program, would accomplish such goal. Use of the formula, as incorrectly defined by the ITB and interpreted by petitioner in these proceedings, would not accord any meaningful weight to price. 2/ Under such circumstances, it cannot be reasonably concluded that the Department departed from the essential requirements of law when it declined to apply the methodology as interpreted by petitioner to award the contract. Moreover, for the reasons that follow, petitioner has failed to demonstrate that the Department's decision to stand by its award based on the correctly defined methodology departed from the essential requirements of law. Here, the proof demonstrates that petitioner, upon receipt and review of the ITB, was well aware that the formula for awarding points based on price was nonsensical, and most likely, in error. 3/ Notwithstanding, petitioner took no action under the provisions of general condition 6 and special condition 4.4 of the ITB to raise any question or seek any clarification or interpretation of the formula from the Department. 4/ Rather, petitioner submitted its best price offer, more likely than not, without reliance on the erroneous formula set forth in the ITB. 5/ Under such circumstances, it cannot be concluded that the Department's award of the contract, based on an application of the correct definition of factor A, accorded any bidder an unfair advantage or otherwise departed from the essential requirements of law.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that a final order be rendered dismissing the subject bid protest. DONE AND ENTERED in Tallahassee, Leon County, Florida, this 20th day of May 1992. WILLIAM J. KENDRICK Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 20th day of May 1992.

Florida Laws (3) 120.57120.68287.057
# 4
GULF SOUTH REALTY, INC. vs. DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES, 88-003765BID (1988)
Division of Administrative Hearings, Florida Number: 88-003765BID Latest Update: Dec. 09, 1988

Findings Of Fact During March 1988, the Respondent issued an Invitation to Bid by which it sought to lease 17,973 net usable square feet of office space to be located within a specified geographic area in Tampa, Florida, under a nine year lease with two additional three year option periods. This Invitation to Bid is referred to as Lease Number 590:1927. Three bids were received in response to the Invitation to Bid, and they were opened on May 13, 1988. Bids were received from the Petitioner, 8900 Centre, Ltd., and the Allen Morris Management Company. All bidders were determined to be responsive to the Invitation to Bid. Despite the fact that petitioner submitted the lowest bid, Respondent notified Petitioner by letter dated June 10, 1988, of its intent to award Lease Number 590:1927 to 8900 Centre, Ltd., as the lowest and best bidder. Petitioner has timely filed its protest seeking review of that decision. It is undisputed that Petitioner submitted the lowest bid. For the first year of the lease, Petitioner bid $7.85 per square foot, while 8900 Centre bid $7.95 per square foot. Thereafter, Petitioner proposed a yearly increase of 50 cents per square foot, reaching $11.85 per square foot in the ninth year of the lease, while 8900 Centre proposed annual increases of approximately 75 cents, reaching $14.00 per square foot in the ninth year. This equates to an actual dollar difference over the nine year term of approximately 185,000. However, using a present value methodology and a present value discount rate of 8.81 percent referred to on page 17 of the bid submittal form, the present value difference in these two bids is approximately $1,000 per month, which would result in a present value difference between Petitioner and 8900 Centre of approximately $108,000 over the nine year period. Neither the Invitation to Bid, bid specifications, nor the actual bids were offered into evidence. One page of the bid submittal form, designated as page 17 of 18, was offered and received in evidence. This portion of the bid submittal form states that the "successful bid will be that one determined to be the lowest and best." It also sets forth evaluation criteria, and assigns weights to each criteria. The evaluation criteria include associated fiscal costs (35 points), location (40 points) and facility factors (25 points) . A synopsis of bids was also offered and received in evidence showing the points awarded to each bidder by the Respondent's bid evaluation committed. Out of a possible 100 points, 8900 Centre received 95.17 points, while Petitioner received 82.25 points and the Allen Morris Management Company received 70.67 points. Petitioner asserts that the members of the evaluation committee were not qualified or knowledgeable in basic construction, design and engineering principles, and therefore could not competently evaluate the bids submitted. However, Petitioner did not offer competent substantial evidence to support this contention. Only the chairperson of the committee, Susan Jennings, was called to testify, and she appeared thoroughly knowledgeable in the bid process, the needs of the agency, the bid requirements and the representations made to the committee members by each bidder, including Petitioner, when the committee made its site visit to each location. Since the actual Invitation to Bid, bid specifications, and evidence about the other committee members were not introduced, it is not possible to know what the specific duties of the committee were, how they were to carry out their duties their qualifications and training, and whether they failed to competently carry out these duties, as alleged by Petitioner. Despite Petitioner's lower bid, Respondent awarded this lease to 8900 Centre, Ltd., based upon the evaluation committee's determination assigning 8900 Centre the highest number of evaluation points. Out of a possible 35 points for fiscal costs, Petitioner received 34 and 8900 Centre received 31.5. Thus, Petitioner's status as low bidder is reflected in the points awarded by the committee. Since neither the bid invitation or specifications were introduced, no finding can be made as to whether the difference between these two bidders comports with any instructions or directions provided by the agency to potential bidders, or whether this difference of 2.5 points on this criteria reasonably reflects and accounts for the dollar difference in these two bids. Petitioner received 34.75 points out of a possible 40 points on the general evaluation criteria "location," while 8900 Centre received the full 40 points. Within this criteria, there were three subcategories, and on the first two subcategories (central area and public transportation) there was an insignificant difference of less than one-half point between Petitioner and 8900 Centre. The major difference between these two bidders which accounts for their significant difference on the location criteria, was in the subcategory of environmental factors, in which Petitioner received 15.17 points and 8900 Centre received the full 20 points. Petitioner did not present competent substantial evidence to discredit or refute the committee's evaluation in the subcategory of environmental factors. To the contrary, the only testimony from a committee member was that of Susan Jennings, and according to her, Petitioner failed to explain the availability of individual air conditioning and heating controls, or the possibility of separate program entrances, which could be made available under its bid. Although Petitioner sought to explain at hearing that these desires of the agency could be accommodated in its bid, there is no evidence that such an explanation was provided in its bid or during the bid process when the evaluation committee visited the Petitioner's site. The committee was aware, however, that 8900 Centre would provide individual heating and air conditioning controls, as well as separate outside entrances for the three programs which would occupy the leased space. Additionally, the committee was concerned, according to Jennings, that parking areas at Petitioner's facility were more remote and removed from the building entrance than at 8900 Centre, and were somewhat obscured by trees and shrubbery, thereby presenting a potential safety concern for employees working after dark. Finally, every employee would either have a window or window access at 8900 Centre, while it was not explained that Petitioner's site would offer a similar feature. Thus, Petitioner failed to establish that the evaluation committee erred in assigning a significantly greater number of points for environmental factors to 8900 Centre than to Petitioner. The evidence reflects a reasonable basis for this difference. The other significant difference between these two bidders was in the subcategory for layout and utilization under the evaluation criteria "facility." Petitioner received 13.67 points while 8900 Centre received a full 20 points. Jennings explained that the separate outside entrances leading directly into the three programs that would occupy this space was preferred to a single reception area for all three programs. Petitioner offered the single reception area in its bid and site visit presentation, while 8900 Centre made it clear that each program would have its own entrance. Since these programs do not have a receptionist position, and none wanted to give up a secretarial position to serve as receptionist for all three programs, the committee did not consider the single reception area entrance to be desirable. Additionally, Petitioner's facility was a two-story building, while 8900 Centre is a single story facility. Jennings explained that the committee considered a ground level facility to be preferable to a two story building, particularly since the Medicaid program was to occupy the major portion of this space. The Medicaid program would have to be split up at Petitioner's facility, either in two separate buildings or on two levels of the same building, while at 8900 Centre, Medicaid could be accommodated in one, single story building, with the other two programs in a second, single story building. Finally, parking at 8900 Centre was directly next to, and outside the entrance of the building, while Petitioner offered to make assigned spaces available in a general parking area which serves its entire 100,000 square foot complex. The parking offered by Petitioner is more remote than that offered by 8900 Centre, and would be less secure at night due to a greater distance from the building entrances and the parking lot. Thus, Petitioner failed to establish that the committee erred in assigning a significantly greater number of points for layout and utilization to 8900 Centre than to Petitioner. There is a reasonable basis for this difference, according to the evidence in the record.

Recommendation Based upon the foregoing, it is recommended that Respondent enter a Final Order dismissing Petitioner's protest to Lease Number 590:1927. DONE AND ENTERED in Tallahassee, Leon County, Florida, this 9th day of December 1988. DONALD D. CONN Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1050 Filed with the Clerk of the Division of Administrative Hearings this 9th day of December 1988. APPENDIX (DOAH Case Number 88-3765 BID) Rulings on Petitioner's Proposed Findings of Fact: Adopted, in part, in Finding of Fact 1, but Rejected in Finding of Fact 10, and otherwise as not based on competent substantial evidence in the record. Adopted in Finding of Fact 5. 3-5. Adopted in Finding of Fact 4, but Rejected in 7. 6-7. Rejected in Finding of Fact 8. Rejected in Finding of Fact 10, and otherwise as not based on competent substantial evidence in the record. Rejected in Findings of Fact 9 and 10, and otherwise as not based on competent substantial evidence. Rulings on the Respondent's Proposed Findings of Fact: Adopted in part in Finding of Fact 1, but otherwise rejected as not based on competent substantial evidence. Adopted in Finding of Fact 4. 3-4. Adopted in part in Findings of Fact 5 and 6, but otherwise rejected as not based on competent substantial evidence in the record of this case. Adopted In Findings of Fact 5, 7-10. Adopted in Finding of Fact 5. Adopted in Finding of Fact 7. Adopted in Finding of Fact 8. Rejected as irrelevant and unnecessary since the point difference in this subcategory is insignificant. Adopted in Finding of Fact 9. 11-12. Adopted in Finding of fact 10. COPIES FURNISHED: Michael V. Giordano, Esquire 7821 North Dale Mabry Suite 100 Tampa, Florida 33614 Jack Farley, Esquire W. T. Edwards Facility 4000 West Buffalo Fifth Floor, Room 520 Tampa, Florida 33614 Sam Power, Clerk Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, Florida 32399-0700 Gregory Coler, Secretary Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, Florida 32399-0700 John Miller, General Counsel Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, Florida 32399-0700

Florida Laws (2) 120.53120.57
# 5
WESTON INSTRUMENTS, INC. vs. HARRIS CORPORATION, HATHAWAY INSTRUMENTS, INC., AND DEPARTMENT OF ENVIRONMENTAL PROTECTION, 75-002110BID (1975)
Division of Administrative Hearings, Florida Number: 75-002110BID Latest Update: Oct. 05, 1977

Findings Of Fact In August, 1975, the Department of General Services invited competitive bids for the purchase of supervisory and control equipment and revenue metering equipment for expansion of primary electric utilities in the Capitol Center, a project known as State Project No. DGS-6026/6424, AEP File No. 74288-003. Plans and specifications for the project were developed by the department's consulting architect/engineers Reynolds, Smith and Hills. The Department of General Services (hereinafter Department) and Reynolds, Smith and Hills (hereinafter Reynolds) conducted formal bid opening on September 25, 1975. Bid proposals were received from petitioner, Weston Instruments, Inc. (hereinafter Weston), and from Respondents, Harris Corporation (hereinafter Harris) and Hathaway Instruments, Inc. (hereinafter Hathaway). The amount of the bids were as follows: CONTRACTOR BASE BID ALTERNATE NO. 1-ADD TOTAL Harris 332,000.00 28,649.00 360,649.00 Weston 338,991.00 20,965.00 359,996.00 Hathaway 343,429.00 33,224.00 376,653.00 Hathaway's bid as submitted was responsive to the specifications and other requirements of the bid invitation. Weston's bid was responsive to the specifications and requirements of the bid invitation with the following exception. Specification B-2, in its second paragraph, states: "In order to facilitate the execution of the Agreement, the Bidder shall submit with his proposal a list of and brief description of similar work satisfactorily completed, with location, date of contracts, together with names and addresses of Owners." Weston did not submit that information with its bid but did submit that information on October 9, 1975. The Harris bid as submitted was not responsive to the specifications and requirements of the bid invitation. The material deviations from the specifications found in the Harris bid are as follows: Paragraph 16755-13(c) of the specifications states that data logger equipment by Teletype, Lear Siegler or General Electric will be considered. The Harris bid proposed a data logger manufactured by Practical Automation, Inc. and noted that if Harris was required to conform to the specifications by furnishing a data logger manufactured by one of the three specified manufacturers, its base bid would have to be increased by $635.00. Paragraph 16755-18 of the specifications requires a specific number of supervisory functions at each of the nineteen locations. The Harris bid met the requirements of the specifications at only one of the nineteen locations. At each of the other eighteen locations the Harris bid was from one to three supervisory points deficient. According to the evidence presented it would cost between $250 to $300 per location to furnish the supervisory points left out of Harris' bid. Paragraph 16755-13(d) of the specifications requires that the data logger shall log an uninitiated (alarm) change of status in red lettering. Harris' bid states that the equipment they have chosen is not available with red ribbon printout and that they therefore propose that all changes normally logged in red would instead have an asterisk in the first column. This specification requiring logging in red of an alarm change of status was included by the specifications writer of the architect/engineers as a safety feature. Paragraph 16755-13(e) of the specifications requires that the log shall contain time in a 24 hour format to a tenth of a minute. The Harris bid proposes that the log shall be in seconds rather than tenths of a minute. The specifications require equipment delivery to the job site and substantial completion within 180 calendar days after receipt of Notice To Proceed. The specifications further provide for liquidated damages of $100 per day for each day the contractor fails to meet the above completion date. The Harris bid requested that the liquidated damages clause and the required time for completion be modified to provice that the 180 day period would not commence until all drawings had been approved by the architect/engineers. The architect/engineers, Reynolds, Smith and Hills, calculated that the required drawing time was approximately 60 days. Therefore, the Harris bid proposes that Harris would have 240 days instead of 180 days in which to deliver the equipment to the site and substantially complete the contract. The Harris bid proposed a deviation from the warranty provision of the specifications. The specifications in paragraph E-17 placed the final determination of the need for repairs or changes under the guarantee clause of the specifications with the architect/engineers and the owner. Harris proposes to alter those specifications and place the right of final determination as to the existence and cause of any claim defect with Harris. Harris' bid contained information setting forth their experience with the Micro II System, which is the system they proposed in their bid. That information shows that the Micro II System had been in use no more than two and one-half years at the time of the bid letting. In its evaluation of the bidders' proposals, based upon the data contained in the original bid packages, Reynolds calculated that the deviation from the specifications by Harris gave Harris at least a $10,135 advantage in its bidding (See Petitioner's Exhibit 8). That evaluation did not include a dollar value for the deviation from the specification concerning the warranty. In that evaluation Reynolds noted the failure of Harris to meet the supervisory point requirements. They calculated that this would add $3,900 to Harris' bid based on twelve locations at $300 per location. In fact, Harris failed to meet the requirements at eighteen locations, which at $300 per location, would add $5,400 to Harris' bid. Thus, using the evaluation figures of Reynolds, it appears that Harris' deviations from the specifications gave them at least an $11,635 advantage in the bidding. On October 9, 1975, Reynolds held a conference with each of the three bidders. At that conference Weston provided a list of three names, with addresses of customers for whom Weston had completed work similar to that proposed in its bid. Reynolds did not receive any material information from these references until after October 31, 1975. At least two of the references commented favorably on Weston's performance in letters to Reynolds dated January 13, 1976 and January 20, 1976, respectively. By letter dated October 31, 1975, Reynolds' project manager for this project conveyed the architect/engineers' recommendation for award to the Department. That recommendation was that the contract be awarded to Hathaway Instruments, Inc., for the base bid item only. The recommendation noted that the alternate should be rejected because the bids for the alternate were excessively high. As stated in the letter of recommendation, Reynolds rejected Harris' bid because "there were several major exceptions taken to the specification (sic), the most serious of which was their not being able to meet the delivery schedule." Also, as stated in the letter of recommendation, Weston's bid was apparently rejected because they "could not meet the experience qualifications as specified." Harris, at the time of the bid letting, had five years experience with its Micro I equipment but had only two and one-half years experience with its Micro II equipment. The two lines of equipment constitute two generations of equipment. Neither Harris nor Weston had five years experience with the specific equipment proposed in their bids. Both, however, have had five years experience with the general type system and equipment proposed with Harris being the more experienced of the two. Based upon the evidence presented Weston and Harris are both responsible bidders. In November, 1975, the Department directed Reynolds to contact Harris and determine whether Harris would conform their bid to the specifications. The project manager for Reynolds so contacted Harris and by letter dated November 17, 1975 (Petitioner's Exhibit 4), notified the Department that Harris stated they would deliver the equipment within the time required by the specifications. That letter reiterated Reynolds' recommendation of Hathaway as contained in their letter of October 31, 1975. Reynolds did not retreat from their recommendation of Hathaway and at the final hearing again stated that recommendation. Thereafter, the Department proposed to award the contract to Harris and set the matter for final decision on December 2, 1975. Harris' bid was a responsible offer but was not in full compliance with the bid specifications and conditions. The bids of Weston and Hathaway were responsible offers and were in full compliance with the bid specifications and conditions except as noted in paragraphs 4, 7 and 19 herein. Paragraph B-18 of the Specifications and Contract Documents (Petitioner's Exhibit 1) states that "No bid modification will be accepted after the close of bidding has been announced." Section A of the same document states that bids would be received until 2:00 p.m. EDST, on September 25, 1975. No evidence was presented which would show that the time for receiving bids was extended beyond that set forth above. Therefore, the close of bidding appears to have been at 2:00 p.m., EDST, September 25, 1975. The agreement by Harris to conform their bid to the specifications and conditions constituted a material modification of their bid. This modification occurred in November, 1975, after the close of bidding, and was therefore not allowable under the terms of the Specifications and Contract Documents set forth above. The lowest base bid and alternate bid of those responsible offers received in full compliance with the bid specifications and conditions was that of Weston. No evidence was presented which would show that the Department submitted its complete File on this matter to the Division of Purchasing along with its reasons for recommending a bid other than the low bid meeting specifications, as required by Section 13A-1.02(a), F.A.C.

Florida Laws (2) 287.012287.042
# 6
LIDO LINES, INC. vs. LEE COUNTY SCHOOL BOARD, 87-003338BID (1987)
Division of Administrative Hearings, Florida Number: 87-003338BID Latest Update: Sep. 25, 1987

Findings Of Fact In June 1987 The School Board of Lee County, Florida invited the submission of sealed bids for grading and drainage improvements at the new Multipurpose Building at Fort Myers High School. In addition to requiring grading, the project involves the erection or placement of structures in the nature of a drainage system consisting of culverts, pipes, and concrete inlets with grates, to be tied into the existing drainage system off School Board property across a county right-of-way into a culvert for discharge across the street, and which on School Board property attaches to and becomes a part of an existing building. Sealed bids were submitted by Systems Technologies Co. of Ft. Myers, Inc. (hereinafter "Systems Technologies") and by Ledo Lines, Inc. Respondent determined Systems Technologies to be the lowest responsible bidder and advised Ledo Lines, Inc., that it would be awarding the contract to Systems Technologies. Warren W. Hunt is the president and the qualifying agent of Systems Technologies. Hunt has an underground utilities contractor's license which has been inactive since it was obtained by him in March, 1986, being inactive therefore both at the time that Hunt submitted the bid on behalf of Systems Technologies and at the time of the final hearing in this cause. The inactive status results from Hunt's failure to complete the license process with the State of Florida. Since Hunt's license was inactive due to being incomplete at the times material to this cause, neither Hunt nor Systems Technologies was a licensed contractor and Systems Technologies was not a responsible bidder at the time that the bid was submitted. The contract specifications set forth the method by which the bids would be evaluated. Paragraph numbered 2.9 on page PD-4 provides as follows: Comparison of Proposals - Proposals will be compared on the basis of total computed price for each division of work. Total computed price equals the sum of the prices for the lump sum Contract Item, plus the sum of the total prices for the unit price Contract Items for each Division of work. The total price for each unit price Contract Item will be obtained by multiplying the estimated quantity of each item by the correspond- ing unit price set forth in the Proposal form[.] That provision, accordingly, requires that the bids be evaluated based upon the sum of all line items rather than based only upon their total or "bottom line" figure. Respondent's Director of Facilities Planning admitted that he failed to comply with this provision of the contract specifications in evaluating the two bids submitted to him and in determining that the bid should be awarded to Systems Technologies. In Systems Technologies' bid, the sum of the prices for the lump sum contract items plus the sum of the total prices for the unit price contract items amounts to $30,109.60. However, in submitting its bid Systems Technologies incorrectly added its column of figures and incorrectly computed its Total Contract Price (Estimated) to be $29,768. Since the contract specifications envision a unit price bid rather than a lump sum bid, the amount of the bid of Systems Technologies is in fact the amount of $30,109.60. The bid of Ledo Lines, Inc., is for $29,913.84. Ledo Lines, Inc., is, therefore, the low bidder on this project. The contract specifications when read in their entirety clearly require that the low bid be determined by adding the unit price and lump sum components rather than relying on the lump sum "bottom line" figure shown for Total Contract Price (Estimated). Employees of the consultant who Prepared the specifications testified that they expect to be able to hold the bidders to the unit prices but not to the Total Contract Price (Estimated) because the estimated quantities may change. Thus, the evidence is uncontroverted that the determination of low bidder pursuant to the contract specifications is based upon the total of the unit price provisions and not by the single figure at the bottom of the page which adds those individual prices and which was added erroneously in this case by Systems Technologies. In their Prehearing Stipulation, the parties stipulated that the School Board is subject to mandatory competitive bidding for this project. They further stipulated that where there is mandatory competitive bidding, the contract must be awarded to the lowest qualified, responsive bidder. Since Systems Technologies is neither a qualified, responsive bidder nor the lowest bidder, it is clear that Ledo Lines, Inc., is the lowest responsive bidder for the project in question.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is, RECOMMENDED that a Final Order be entered determining Ledo Lines, Inc., to be the lowest responsive bidder and awarding the contract for grading and drainage improvements to the Multi- purpose Building at Fort Myers High School to Ledo Lines, Inc. DONE and RECOMMENDED this 25th day of September, 1987, at Tallahassee, Florida. LINDA M. RIGOT, Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 25th day of September, 1987. COPIES FURNISHED: James E. Melvin, Superintendent School Board of Lee County 2055 Central Avenue Fort Myers, Florida 33901 E. G. Couse, Esquire Post office Drawer 1647 Fort Myers, Florida 33902 Harry A. Blair, Esquire Post Office Box 1467 Fort Myers, Florida 33902

Florida Laws (3) 120.53120.57489.105
# 7
ADLEE DEVELOPERS, INC. vs DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES, 92-002798BID (1992)
Division of Administrative Hearings, Florida Filed:Miami, Florida May 06, 1992 Number: 92-002798BID Latest Update: Jul. 31, 1992

The Issue The issue for consideration in this matter is whether Respondent's intended award of a lease for office space to Intervenor, Anthony Abraham Enterprise, is arbitrary and capricious and whether the proposal of the Petitioner, Adlee Developers, the current lessor, is responsive.

Findings Of Fact The parties agreed that on April 7, 1991, the Department issued an Invitation to Bid entitled, "Invitation To Bid For Existing Facilities State Of Florida Lease Number 590:2286, Dade County" This procurement was for the provision of 30,086 net rentable square feet to be used for office space in Dade County. A 3% variance was permitted. The facility was to house the District's Aging and Adult Services office which has been a tenant in Petitioner's building for several years and remained there during the pendancy of this protest process. According to the published advertisement, a pre-proposal conference was to be held on April 22, 1991, with all bids due by the bid opening to be held at 10:00 AM on May 30, 1991. The pre-bid conference was conducted by Philip A. Davis, then the District's facilities service manager and included not only a written agenda but also a review of the evaluation process by which each responsive bid would be examined. Petitioner asserts that the potential bidders were told, at that conference, that annual rental increases for the ten year lease period could not exceed five per cent (5%) and claims that Abraham's bid exceeded those guidelines. Thorough examination of the documentary evidence presented and the transcript of the proceedings, including a search for the reference thereto in Petitioner's counsel's Proposed Findings of Fact, fails to reveal any support for that assertion as to an increase limitation. The ITB for this procurement, in the section related to the evaluation of bids, indicated that pursuant to the provisions of Sections 5-3 and 5-11 of HRSM 70-1, dealing with the procurement of leased space, the responsive bids would be reviewed by an evaluation committee which would visit each proposed facility and apply the evaluation criteria to it in order to determine the lowest and best bidder. The evaluation criteria award factors listed in the ITB defined a successful bid as that one determined to be the lowest and best. That listing of evaluation criteria outlined among its categories associated fiscal costs, location, and facility. As to the first, the committee was to look at rental rates for both the basic term of the lease and the optional renewal period. The rates were to be evaluated using present value methodology applying the present value discount rate of 8.08% and rates proposed were to be within projected budgeting restraints of the Department. The total weight for the rental rate category was to be no more than 40 points with 35 points being the maximum for the basic term and 5 points for the option. Evaluation of the location was to be based on the effect of environmental factors including the physical characteristics of the building and the area surrounding it on the efficient and economical conduct of the operations planned therefor. This included the proximity of the facility to a preferred area such as a co-location, a courthouse, or main traffic areas. This item carried a maximum weight of 10 points. Also included in location were the frequency and availability of public transportation, (5 points); the proximity of the facility to the clients to be served, (5 points); the aesthetics of not only the building but the surrounding neighborhood, (10 points); and security issues, (10 points). The third major factor for evaluation was the facility itself and here the committee was to examine the susceptibility of the offered space to efficient layout and good utilization, (15 points), and the susceptibility of the building, parking area and property as a whole to possible future expansion, (5 points). In that regard, the Bid Submittal Form attached to the ITB called for the successful bidder whose property did not have appropriate zoning at the time of award to promptly seek zoning appropriate to the use classification of the property so that it might be used for the purposes contemplated by the department within 30 days. In the event that could not be done, the award could be rescinded by the department without liability. The committee could award up to 100 points. The basic philosophy of this procurement was found in paragraph 1 of the Bid Award section of the ITB which provided: The department agrees to enter into a lease agreement based on submission and acceptance of the bid in the best interest of the department and the state. After the bid opening, three of the four bids received, excluding Petitioner's which was initially determined to be non-responsive, were evaluated by the Department's bid evaluation committee according to the above point system which allowed no discretion or deviation from the formula in comparing rental rates between bidders. Once Petitioner's bid was thereafter determined to be responsive, it, too was evaluated by the committee. At this second evaluation session, relating to Adlee's bid only, the committee scored the bid and added its scores to the original score sheets upon which the other three bidders' scores had been placed. Abraham had the lowest rental rates for the basic term of the lease and received the maximum award of 35 points for that category while Adlee received points. Abraham received an additional 2.29 points for the optional period rates while Adlee got 0. In the other categories, "location" and "facility", which comprised 60% of the points, Adlee's facility was routinely rated superior to Abraham's except for the area related to susceptibility for future expansion in which Abraham was rated higher by a small amount. Overall, however, Adlee was awarded 620.41 points and Abraham 571.03 points and as a result, Adlee was rated by the committee to be the lowest and best bidder. RCL, another bidder, was rated second, with Abraham third and DCIC fourth. Thereafter, the committee chairman, Mr. VanWerne, forwarded the new (and complete) evaluation results to the District Administrator on June 14, 1991 by an addendum dated June 27, 1991 which recommended award of the bid to Petitioner, Adlee Developers. No award was made at the time. Several factors not pertinent to the issues here caused that delay. Among the major of these was pending legislation which would have transferred the operation needing this space to another agency. This transfer was never consummated, however. On or before March 20, 1992, the new District Administrator, Mr. Towey, who had been appointed to his office in December, 1991, and who was made aware that this procurement had not been finalized, requested all available material on it so that he could study it and make his decision based on his own review of the submission. As a part of his determination process, he visited and inspected both the Adlee and the Abraham sites. One of the factors he considered was what appeared to be the significant monetary discrepancy between the two pertinent bids. Initial calculations indicated that Abraham's bid was approximately $835,000.00 lower than Adlee's over the ten year basic term of the lease. This amount was subsequently determined to be somewhat lower but the discrepancy is still significant. Nonetheless, because of that difference, Mr. Towey called a meeting with the members of the evaluation committee which had evaluated the bidders and had recommended Adlee. His stated reason for calling that meeting was to allow him to hear their reasons for rating the submissions as they had done and to take that information into consideration when he made his final decision. None of the committee members who testified at the hearing at Petitioner's behest indicated any feelings of pressure or intimidation by Mr. Towey. During his meeting with the committee members, Mr. Towey went over several of the evaluation criteria award factors to determine the committee's rationale. Of major importance was the issue of cost, of the availability of the facility to transportation to and from the building, employee security and the ability to control access to the facility, and the availability of on-site parking without cost to both employees and clients. It appears the Adlee facility is a multistory building with some parking available on site and would be easier to control. In addition, it is closer to public transportation access points. There is, however, some indication that on-site parking for clients would not be free and the closest free parking is some distance away. According to Adlee's representative, this matter would not be a problem, however, as adequate, free on site parking, which apparently was not initially identified as a problem, could be provided in any new lease. The Abraham facility is a one story building surrounded by on-site parking. In that regard, however, at hearing, Petitioner raised the claim that the Abraham site did not, in actuality, provide adequate parking because the zoning requirements of the City of South Miami, the municipality in which the facility is located, did not permit the required number of parking spaces to accommodate the prospective need. Petitioner sought and received permission to depose the Building and Zoning Director for the city, Sonia Lama, who ultimately indicated that the Abraham site was grandfathered in under the old zoning rule and, thereby, had adequate parking available. In any case, had this not been true, under the terms of the ITB, any zoning deficiencies could have been corrected after award, or the award rescinded without penalty to the Department. After the meeting with the committee, Mr. Towey indicated he would probably go against the committee's recommendation. One of his reasons for doing so, as he indicated to them, was the appearance certain amenities in the facility would give. In the period between the time the committee met and Mr. Towey was ready to decide, there were several newspaper articles published in the Miami area which were negative in their approach to Department leasing policies and this publicity had an effect on him. In his response to a reporter's question, in fact, Mr. Towey indicated he would not permit the lease of any property which contained such amenities while he was District Director. There is some evidence that the wet bar referred to here was a sink and counter used by agency employees to make coffee. However, before making his decision, Mr. Towey also met with Herbert Adler of Adlee. Mr. Towey advised him he was concerned about the fact that the Adlee property provided a wet bar, a private bathroom and some other amenities in that suite of offices occupied by the Department. Mr. Towey was adamant in his public and private pronouncements on the subject that there would be no such amenities in HRS offices in his District while he was in charge. At the meeting in issue, Mr. Adler made it very clear he was willing to remove all the offending amenities to bring the space into conformity with Mr. Towey's standards. Mr. Towey obviously took Adler at his word as he did not consider this matter to be an issue when he evaluated the bids. Based on his independent evaluation of the proposals, and considering all the pertinent factors, Mr. Towey decided not to concur with the committee's recommendation and instead recommended to the Department's Office of General Services that the bid be awarded to Abraham. Because his recommendation differed from that of the evaluation committee, under the provisions of Section 5-13, HRS Manual 70-1, he was required to forward additional justification for his position. In his forwarding memorandum dated March 20, 1992 to Mr. King Davis of the Department's Office of General Services, Mr. Towey listed as his reasons for disagreement with the committee's recommendation, (1) the lower term cost of Abraham's bid, (2) his opinion that the one story floor plan of Abraham was more convenient and accessible to clients, and (3) the provision for ample free parking at the Abraham site as opposed to the limited parking at the Adlee building. Petitioner claims that Mr. Towey's justification for disagreement was improper because, (a) the rental difference he cited was not based on the ITB formula and did not consider the difference in square footage offered; (b) the rental rate comparison compared a proposed lease with an existing lease, not with a proposal; and (c) the reference to on-site parking referred to the situation under the existing lease with Adlee and not to what could occur under a new lease. The major factor in Mr. Towey's decision was the price differential between the two offerings. While the difference may not have been as great as presented initially by the department staff, even taken in its most conservative light of about half that amount, and considering the appropriate figures, the difference was still considerable and significant. In the continuing period of budgetary austerity under which state operations have been and must continue to be conducted, the financial consideration loomed large in his thinking. As for the parking situation, no change for the better was provided for in Adlee's proposal and even if it were, it was but one of several factors. When Mr. Towey's March 20, 1992 memorandum in justification of his disagreement was evaluated at the Office of General services, it was determined that his decision was rational and objectively justified. Thereafter, by letter dated April 2, 1992, the Office of General Services authorized District 11 to award the lease to Abraham and this decision was transmitted to all responsive bidders by letter dated April 7, 1992. It was this action which prompted Petitioner's protest.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is, therefore: RECOMMENDED that a Final Order be entered dismissing the protest by Adlee Developers, Inc., of the award of procurement No. 590:2286 to Anthony Abraham Enterprises. RECOMMENDED this 10th day of July, 1992, in Tallahassee, Florida. ARNOLD H. POLLOCK, Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 10th day of July, 1992. APPENDIX TO RECOMMENDED ORDER IN CASE NO. 92-2798 The following constitutes my specific rulings pursuant to Section 120.59(2), Florida Statutes, on all of the Proposed Findings of Fact submitted by the parties to this case. FOR THE PETITIONER: - 4. Accepted and incorporated herein. Accepted. Accepted that the pre-bid conference was held but reject the finding that a 5% limit was mentioned. Accepted and incorporated herein. Accepted. Accepted and incorporated herein. & 11. Accepted and incorporated herein. 12. - 14. Accepted and incorporated herein. 15. - 19. Accepted and incorporated herein. Accepted and incorporated herein. Accepted. Accepted except for the next to last sentence which is rejected. Accepted. Accepted and incorporated herein. Accepted but not probative of any material issue. Accepted and incorporated herein. Accepted. Accepted and incorporated herein. & 30. Rejected. - 33. Accepted and incorporated herein. FOR THE RESPONDENT AND INTERVENOR: & 2. Accepted and incorporated herein. 3. - 5. Accepted. Accepted and incorporated herein. Accepted and incorporated herein. Accepted and incorporated herein. - 16. Accepted and incorporated herein. 17. - 19. Accepted and incorporated herein. 20. & 21. Accepted and incorporated herein. Accepted and incorporated herein. - 25. Accepted. COPIES FURNISHED: Melinda S. Gentile, Esquire Ruden, Barnett, McClosky, Smith, Schuster & Russell 200 East Broward Blvd. P.O. Box 1900 Fort Lauderdale, Florida 33302 Paul J. Martin, Esquire Department of Legal Affairs The Capitol - Suite 1501 Tallahassee, Florida 32399-1050 Peter W. Homer, Esquire Greer, Homer & Bonner, P.A. 3400 International Place 100 S.E. 2nd Street Miami, Florida 33131 John Slye General Counsel Department of Health and Rehabilitative Services 1323 Winewood Blvd. Tallahassee, Florida 32399-0700 Sam Power Agency Clerk DHRS 1323 Winewood Blvd. Tallahassee, Florida 32399-0700

Florida Laws (3) 120.53120.57571.03
# 8
DERICK PROCTOR vs DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES, 93-000263F (1993)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Jan. 25, 1993 Number: 93-000263F Latest Update: Oct. 04, 1994

The Issue The issue in this cause is whether costs and attorney's fees are due Petitioner, hereinafter PROCTOR, from Respondent, hereinafter HRS, pursuant to Section 57.111, Florida Statutes, as a result of Division of Administrative Hearings Case Number 91-5963-BID, and, if so, the amount of costs and fees.

Findings Of Fact The petition for fees and costs herein is brought exclusively under Section 57.111, Florida Statutes, and relates back to a bid protest wherein PROCTOR and TCC #3 LTD., INC., hereafter TCC, were the only bidders on HRS lease 590.236. PROCTOR was the protestant/Petitioner and TCC was the apparent successful bidder/Intervenor in Derick Proctor v. Department of Health and Rehabilitative Services, DOAH Case No. 91-5963BID. HRS' Invitation to Bid (ITB) for lease 590:236 required bidders to submit evidence of control of the property being offered, including the parking areas. Evidence of control could take the form of a deed for the property, an option to purchase the property, or a lease or option to lease showing a right to sublease. TCC did not submit a document labelled "deed," "option to purchase," "lease," or "option to lease" with its bid. TCC submitted as its evidence of control a contract for sale and purchase of the property with Hernando Plaza, Ltd., executed by Edward M. Strawgate and Harold Brown representing themselves to be general partners of the limited partnership. At all times material, the actual record title of the property submitted by TCC for the bid was in the Victor and Lillian Brown Foundation. At the times of the bid opening, evaluation, and August 27, 1991 notice of intended award, HRS had no reliable information as to what entity actually owned the property offered by TCC, and TCC had not disclosed to HRS that its contract to purchase the property was with an entity other than the record owner. Up to then, at least, Hernando Plaza, Ltd. had represented itself to TCC as being the owner of the property. The ITB did not require an abstract of title to be submitted with the bid. HRS normally does not require an abstract from successful bidders, although the ITB contained provisions for future disclosures from successful bidders. Absent some reason to "go behind" facial evidence of control, HRS' ITB attempted at the time to protect HRS by requiring successful bidders to post an irrevocable letter of credit to be forfeited in the event a successful bidder could not perform and for future disclosures concerning the chain of title. (See the recommended order in the underlying case). HRS accepted the contract to purchase the property from Hernando Plaza, Ltd. as TCC's required evidence of control, believing it to constitute an option to purchase. (See Findings of Fact 15-17 infra, this final order). On August 27, 1991, PROCTOR received from HRS a notice of intent to award the bid to TCC. This notice constituted the "window" for protests, if any, to be filed. PROCTOR then timely filed a notice of intent to protest and a formal written protest of the award to TCC. The filing of this protest resulted in an automatic suspension of the bid solicitation and contract award process and referral of the matter to the Division of Administrative Hearings, pursuant to Section 120.53(5)(c), Florida Statutes. This protest formed the basis of the underlying bid case, DOAH Case No. 91-5963BID. No later than the time of the Prehearing Order of September 23, 1991 in Case No. 91-5963BID, the law firm of Gibbs and Rudzik had made known to the hearing officer and counsel for both PROCTOR and HRS its retention as counsel for TCC. TCC moved for leave to intervene in a motion filed September 30, 1991, which was granted in an order of October 4, 1991. In a letter of October 10, 1991, counsel for PROCTOR made counsel for HRS aware of a question of whether TCC could obtain good title to the property. Counsel for PROCTOR proposed in a letter of October 14, 1991 to counsel for HRS that HRS reject both PROCTOR's and TCC's bids and rebid the lease, but this letter was primarily devoted to determining if HRS wished to interpose a new defense that PROCTOR's bid was unresponsive. In the instant fees and costs case, PROCTOR relies on its October 14, 1991 letter as the point from which HRS should have acted to avoid incurring attorney's fees and costs. After the receipt of the two letters, HRS did not reject both bids and rebid the contract but proceeded to formal hearing on October 30, 1991. PROCTOR and HRS share the mutual impression that had HRS accepted PROCTOR's proposal to reject both bids, HRS would have to have allowed TCC an opportunity to protest that decision. At the final hearing in Case No. 91-5963BID, evidence was offered that Hernando Plaza, Ltd. had a conditional option to purchase the property from the record title owner, the Brown Foundation. However, it was not established at the hearing that the conditions of the option had been fulfilled or that TCC or Hernando Plaza, Ltd. could otherwise gain good title to the property through a valid option. It was concluded as a matter of law in Case No. 91-5963BID, that on its face, the ITB stated that control could be evidenced merely by attachment of an "option to purchase," that the ITB stated no further requirements concerning the internal provisions of the option to purchase, and that TCC's conditional contract for purchase constituted a conditional option to purchase. The conditions of the option to purchase and the chain of title, among myriad other matters were subjects of proof at the formal hearing. The conditions of the option to purchase and various complicated real property concepts arising from recorded and unrecorded parts of the chain of title constituted the thrust of the recommended order's assessment that TCC's "control" was speculative only. It is here noted that the totality of the "chain" of title might have been unavailable even by "abstract" due to the lack of recordation of some documents. The lengthy formal hearing adduced evidence concerning the factual issue of whether or not the conditional option to purchase was between TCC and an entity which had such a sufficiently unequivocal interest in the proposed property that it could convey title to TCC in time for TCC to fulfill its obligations under its proposed lease to HRS. There is no evidence that HRS knew of these problems on August 27, 1991, when it gave notice of its intent to award the bid to TCC. Hernando Plaza, Ltd. was the entity with which TCC had contracted. At formal hearing, TCC relied on the legal concept that all interests in the property had merged in the non-title holder, Hernando Plaza, Ltd. This concept, together with recorded and unrecorded elements in the chain of title which were presented at formal hearing, were determined in the recommended order to be too "speculative" on the issue of TCC's control. However, it was also found, upon evidence submitted at formal hearing, that TCC's bid contained no other material deviations from the requirements of the ITB, that the signator of TCC's bid had sufficient status to submit the bid for the TCC corporation, and that TCC's signator could not submit the bid as an agent of the owners of the real property. TCC and its bid signator had never purported to have submitted the bid on behalf of the owners of the real property. (See the recommended order of the underlying bid case.) These issues were raised by PROCTOR and they addressed more than just the facial compliance of TCC's original bid documents which was all HRS had to consider when it made its initial decision in favor of TCC and against PROCTOR. However, the recommended order found HRS to have materially deviated in a number of ways from the bid process in its initial evaluation of PROCTOR's bid, not the least of which was determining that PROCTOR had complied with the ITB requirements for demonstrating control. All such evaluation flaws had been committed by HRS in favor of PROCTOR. Both TCC's and PROCTOR's bids were ultimately found to be unresponsive in the recommended order entered on December 20, 1991. The recommended order also found both had standing to be involved in the bid protest and formal hearing. The recommended order recommended rejecting both bids and readvertising the ITB. The Final Order of HRS entered on January 20, 1992 dismissed PROCTOR's protest on the basis that he lacked standing to protest, as his bid was unresponsive, and awarded the bid to TCC. HRS did not give PROCTOR notice that his bid was not responsive until it issued its Final Order. The Final Order of HRS was appealed to the First District Court of Appeals by PROCTOR. The First District Court of Appeals entered an order on June 22, 1992 finding PROCTOR had standing and remanding the case back to HRS for the purpose of a decision of the issue of whether TCC's bid was also unresponsive. On July 27, 1992, HRS entered its Amended Final Order determining both bids to be unresponsive and that the lease should be relet for bids. The First District Court of Appeals affirmed the Amended Final Order of HRS in a per curiam opinion without discussion on October 13, 1992. HRS did not reject both bids and rebid the contract until after this per curiam opinion. No motion for rehearing was filed with respect to either of the First District Court of Appeals' orders entered June 22 or October 13, 1992, nor was any notice to invoke the discretionary jurisdiction of the Supreme Court filed. PROCTOR did file a motion for rehearing solely on the court's denial of PROCTOR's motion for appellate fees. Mandate was issued by the Clerk of the First District Court of Appeals on December 3, 1992. HRS entered an Order Directing Release of Bid Protest Cost Bond on December 18, 1992, in which HRS stated: Petitioner, Derick Proctor, has prevailed in the above styled bid protest. Petitioner's domicile and principal place of business is Vero Beach, Florida. Petitioner has one employee. Petitioner is a sole proprietorship. Petitioner's net worth does not exceed $2,000,000.00. HRS was not a nominal party in the underlying bid case. HRS did not initially challenge PROCTOR's "small business party" status in this instant fees and costs proceeding. Therefore, that allegation of the fees and costs petition is not at issue. Also, Petitioner's "small business party" status is now stipulated to exist. The parties have stipulated that the maximum statutory fee is $15,000.00 and that $15,000.00 is a reasonable fee if an award of attorney's fees is due. HRS has not protested or objected to the amount of costs claimed, $411.25, if costs are due.

Florida Laws (4) 120.53120.57120.6857.111
# 9
EDWARD D. MATTHEWS AND ROBERT C. WALKER vs. DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES, 89-002529BID (1989)
Division of Administrative Hearings, Florida Number: 89-002529BID Latest Update: Jul. 21, 1989

Findings Of Fact Sometime before January, 1989, The Department of Health and Rehabilitative Services (HRS) requested and received approval from the Department of General Services (DGS) for additional office space to provide for social services in Haines City, Florida. HRS was authorized to procure, through competitive bidding, a lease of 9041 square feet of existing office space, plus or minus 3%. Public notice that HRS was seeking competitive bids was given by advertisement in four central Florida newspapers. HRS had prepared a document entitled Invitation to Bid for Existing Facilities (ITB), which set forth in detail all of HRS' requirements. The purpose of the ITB was to inform all potential bidders of the minimum requirements for submitting a responsive bid, and the specific criteria by which the bids would be evaluated. The evaluation factors and their relative weights were stated in the ITB: Evaluation Criteria The successful bid will be that one determined to be the lowest and best. All bids will be evaluated on the award factors enumerated below: Associated Fiscal Costs Rental rates for basic term of lease. Evaluated using present value methodology by application of the present value discount rate of % (Weighting: 30) Rental rates for optional renewal of terms of lease. Rates proposed are within projected budgeting restraints of the department. (Weighting: 5) Associated moving costs i.e. furniture, equipment, telephone systems, etc. (Weighting: 0) Location Proximity of offered space in central or preferred area of map boundaries. (Weighting: 10) Frequency and availability of satisfactory public transportation within proximity of the offered space. (Weighting: 5) The effect of environmental factors, including the physical characteristics of the building and the area surrounding it, on the efficient and economical conduct of the departmental operations planned for the requested space. (Weighting: 20) Facility Susceptibility of the design of the space offered to efficient layout and good utilization. (Weighting: 20) Provision of the aggregate square footage in a single building. Proposals will be considered, but fewer points given, which offer the aggregate square footage in not more than two locations provided the facilities are immediately adjacent to or within 15 yards of each other. (Weighting: 10) TOTAL POSSIBLE 100% The bid package contained various bid specifications, bid evaluation criteria and the numerical weight assigned to each of those criteria. Specific areas of importance to Respondent in the selection of its office space were: rental rates environmental factors efficient space layout The above areas were important to HRS since the agency would render indigent services to several hundred people every month. The majority of Respondent's clients are served within a 10 day period each month. A great deal of pressure is placed on the surrounding area due to the influx of people. Because of servicing so many people, factors two and three received a great deal of weight under HRS's consideration of the property it desired to lease and occupy. All of the above areas were covered by Respondent's weighted bid evaluation criteria. Sealed bids were submitted by Intervenor, Unirealty Services, Inc. (bid A), and Petitioners, Messrs. Matthews and Walker (bid B). The bids were opened February 20, 1989, and Mr. Michael T. Akridge, former Facilities Services Manager, District VI HRS, determined both bids were responsive. At the time the Intervenors submitted their bid, they included documentation which showed that they had an option contract to purchase the subject facility, and an authorization from the optionees (two principals of Intervenors) for Unirealty to act as their agent. Both Petitioner's and Intervenor's property were within the mandatory geographical area designated in the bid package. Both bids were responsive under the minimum bid specifications and bidder qualifications. The District Administrator appointed a bid evaluation committee to review and grade the responsive bids under the criteria established in the bid package, and to recommend to him the committee's choice of lowest and best bid. The purpose in establishing the bid evaluation committee was to secure input from a cross section of people who had a variety of backgrounds and knowledge that would be material in evaluating the office space, in light of the uses for which it was intended and the relative public worth of the work space. Six individuals who were familiar with the type of work to be done in the proposed space, as well as persons familiar with the bid process were appointed to the Committee. The bid evaluation committee determined that the bid of Unirealty was the "lowest and best." The bid evaluation committee consisted of six representatives of the Department who visited each bidders' site and questioned the bidders' representatives. Each of the committee members worked with or supervised HRS programs that were to be located in the leased space. The solicitation for bids provided each bidder, among other things, with the bid evaluation criteria, a 100 point scale, which the committee used to evaluate the bids. Each committee member's evaluation scores were averaged and totaled to score Petitioners at 90.8, and Unirealty at 83.9. Each committee member gave a higher score to Unirealty. The three major bid evaluation criteria were FISCAL COSTS, LOCATION and FACILITY. Under the FISCAL COST criterion were three sub-categories: Rental Rates, Renewal Rates, and Moving Costs. For Rental Rates, Petitioners received 30 points out of 30 possible, and Unirealty got 23.1. For Renewal Rates, Petitioners got 5 out of 5 possible points, and Unirealty received 3.7 points. No points were awarded for Moving Costs. The evaluation committee did not assess points for Rental or Renewal Rates. These were scored by Michael T. Akridge, bid manager, based on a present value analysis of bidders' proposed rates. Mr. Akridge did not give the Committee the points for Rental and Renewal Rates until after they had completed their evaluations of the LOCATION and FACILITY criteria. The LOCATION criterion also had three sub-categories: Central Area-- 10 points--with both bidders receiving 9.3; Public Transportation--5 points-- which both bidders received; and, Environmental Factors--20 points--out of which Petitioners received 12.8 points and Unirealty 20 points. The Environmental Factors sub-category included building physical characteristics and surrounding area and their effect on the efficient and economical conduct of Department operations. Unirealty received a higher score than Petitioner because the committee believed its building had a better appearance, and was in better shape. The area surrounding the building was more open, while Petitioners' building was in a less desirable neighborhood with a bar or liquor store and bus station nearby which could create problems for clients because of transients. It had far more window space which creates a better work environment, and allows staff to be watchful of clients and their children outside, and the windows would be tinted. The windows at Petitioner's site were limited and no more could be added. Unirealty had more adjacent parking spaces, with handicapped parking closer to the building, and part of it was fenced which provided added protection to clients and staff. Petitioners' site had adjacent businesses whose patrons were using some of the parking spaces which the committee felt could create a problem. The Unirealty building could have an outside food stamp issuance facility which would be far more accessible to clients and to make the lobbies less crowded. It had an existing alarm system. It did not have side streets adjacent to the building, thus there would be less traffic congestion and therefore safer for clients; and, it had outside gathering areas where clients could go to smoke. Of the three sub-categories under FACILITY, Petitioners received 11.8 points out of 20 for Layout/Utilization and Unirealty received 19.7 points; for Single Building, both bidders received 10 points out of 10 possible. For the Layout/Utilization sub-category Unirealty received more points because its building configuration was more flexible and conducive to design of interior space, with less maze effect. The members of the committee each testified that it was important that the Unirealty building had no support poles to get in the way as they did in Petitioners' building. The support poles in Petitioner's building created a safety problem for clients and inhibited the location of desks and corridors. At Unirealty's site each worker could have a window, and mechanical and service areas could be put in the center of the building, with a playroom for clients' children. It provided a better restroom location near the front of Petitioner's building and lobby areas, and clients would not have to wander through work areas to get to the restrooms. Unirealty's building provided better control of clients' movements and thus better security. Members of the committee also upgraded the Unirealty building because its pitched roof was less likely to leak and its air conditioning was zoned thus providing better air quality and temperature control. At Unirealty there was better ingress and egress, and entry ways could be added. This could not be done at Petitioners' site. The Unirealty building could have different entrances for each HRS program, with separate lobbies for each program with less client congestion and better control. During the Committee members inspection of the sites they were told of an existing security alarm system already in place at the Unirealty site and were told that system would remain in place. When asked, the Petitioner's representative was unsure if his client would install a similar system at their site. A security system for the entire building was not included in the bid specifications, and it was improper for the committee to give Unirealty extra points for this unsolicited item. The proposed lease agreement calls for 9041 square feet of office space and a minimum of 66 parking spaces. Unirealty offered 72 parking spaces and Petitioner offered 75. The committee awarded more evaluation points to the Unirealty site based on future expansion capability of the building and the existing additional on-site parking spaces which were visible at the site at the time of inspection. The committee erroneously believed that the extra square footage of building space and extra parking spaces would necessarily be available to HRS if and when it might expand its offices. Future expansion was not in the bid specifications and it was clearly erroneous for them to have included this factor in their bid evaluation. The evaluation committee included the improper bid considerations in their evaluation of the Unirealty property. The two improper factors cannot be considered here. The unanimous recommendation of the evaluation committee was clearly to award the lease to the Intervenor. The evaluation committee based its decision on the scores attributed to each property on the Bid Synopsis sheet by the individual committee members. The committee utilized all the weighted bid criteria. However, two factors were of primary importance. One was its determination that the property offered by the Petitioners presented greater problems for design and flexibility due to the rectangular configuration of the building. The other consideration was that the physical characteristics of the Unirealty site and the surrounding area were considered far superior to the Petitioner's site. A close review of each evaluation sheet and the testimony of each committee member at the hearing shows that the improper factors were not so heavily weighted as to invalidate the committee recommendation. The reasons given by the individual committee members for distinguishing and preferring one bid over another were rational and reasonable considerations and were covered by the bid evaluation criteria. Each individual member gave a rational and reasonable basis for the scoring he or she used on the Bid synopsis score sheets. The scoring was done by each member after inspection of the two buildings and without influence from the other committee members. In essence, the committee felt that Intervenor's property was the better property for the money. Importantly, every committee member came to the conclusion that Intervenor's property was the lowest and best bid. There is no statutory or rule requirement that one scoring method be preferred over another. The only requirement is that the method be rational and reasonable especially where highly subjective, but legitimate criteria are involved in the selection of a piece of property. On these facts, the individual scoring methods used by individual committee members were not arbitrary and capricious, but were very rational and reasonably related to the relative importance the committee members gave the above factors. Over an eight year period the Petitioner's rental cost was significantly lower than the Intervenor's. However, it is clear the legitimate considerations of the committee were crucial enough to override awarding the lease to the lowest bidder. The conclusion that the above factors can and do outweigh price and cost considerations in these facts is not an arbitrary and capricious decision, even though others may disagree with that decision. After the committee recommendation was scored and tabulated, Mr. Akridge requested the committee chair, Ms. Gail Newell, to prepare a draft letter of the proposed bid award. This was done in collaboration with the other committee members. Mr. Michael T. Akridge then prepared the bid award letter for the signature of the Administrative Services Director based on the draft letter. In it the two improper considerations were mentioned. The authority to award the lease to Unirealty was approved on March 8, 1989, by King W. Davis, Director of General Services for HRS based on the bid award letter, dated February 26, 1989.

Recommendation Based on the foregoing, the Hearing Officer recommends that the Secretary of the Department of Health and Rehabilitative Services enter a final order awarding lease number 590:2057 to Unirealty Services, Inc., as the lowest and best bidder. DONE and ENTERED this 21st day of July, 1989, in Tallahassee, Leon County, Florida. DANIEL M. KILBRIDE Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 21st day of July, 1989. APPENDIX Petitioner's Proposed Findings of Fact: The facts contained in paragraphs 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 12, 15, 23, 26, 27, 28, 30, 34, 38, 39 (in part), 40, 41, 42, 45, 46, 47, 48, 49, 50, 51, 53, 64, 65, 67, 69, 70, 71, 76, 77, 81, 83 (in part) are adopted in substance in so far as material. Paragraphs 14, 16, 17, 18, 21, 22, 24, 25, 29, 33, 36, 37, 73, 74, 80 are rejected as conclusions of law. Paragraphs 13, 19, 20, 44, 54, 59, 60, 61, 63, 68, 72, 75, 778, 82, are rejected as not supported by the evidence. Paragraphs 31, 32, 35, 43, 52, 55, 56, 57, 58, 62, 66 are rejected assubordinate or immaterial. Respondent's Proposed Findings of Fact: The facts contained in paragraphs 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17 are adopted in substance in so far as they are material. Intervenor's Proposed Findings of Fact: The facts contained in paragraphs 1-17 are adopted in substance in so far as they are material. COPIES FURNISHED: Edward D. Matthews, Jr. 2405 Hideaway Court Tallahassee, Florida 32303 Gregory L. Coler Secretary Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, FL 32399-0700 Jack Emory Farley, Esquire HRS District VI Legal Counsel 4000 West Buffalo Avenue, Room 500 Tampa, Florida 33614 Neal A. Sivyer, Esquire Paul J. Ullom, Esquire Shackleford, Farrior, Stallings and Evans, P. A. 501 East Kennedy Boulevard Suite 1400 Tampa, Florida 33601 Sam Power, Clerk Department of Health and Rehabilitative Services 1323 Winewood Boulevard Building One, Suite 407 Tallahassee, FL 32399-0700 John Miller, Esquire Department of Health and Rehabilitative Services 1323 Winewood Boulevard Building One, Suite 407 Tallahassee, FL 32399-0700

Florida Laws (4) 120.53120.57255.249255.25
# 10

Can't find what you're looking for?

Post a free question on our public forum.
Ask a Question
Search for lawyers by practice areas.
Find a Lawyer