Findings Of Fact The property upon which Petitioner seeks a variance from the normal requirements for attaining a permit to install an on-site sewage disposal system is found in Leon County, Florida. Specifically, it is located at Lot 4, Block A, Killearn Lakes Unit I. The relative position of this lot in the subdivision is depicted within Petitioner's Exhibit 1 and Respondent's Exhibit 2 admitted into evidence. Respondent's Exhibits 3 through 5 are photographs of the site. Petitioner intends to construct a 1,200 square foot residence. As the photographs depict, some preparation has commenced to the extent of lot clearing and other site work where the home would be constructed. Killearn Lakes Unit I is a pre-1972 subdivision. When the development commenced, it was anticipated that a community sewer system would be utilized, as contemplated by the plans submitted in April, 1971. Subsequently, some lots within the Killearn Lakes Unit I were allowed to be developed with the use of on-site sewage disposal systems, namely septic tanks. There are 150 lots in that category. In 1979, with the advent of certain rules under Chapter 10D-6, Florida Administrative Code, the development was allowed to proceed on the basis of four septic tanks per acre. Over time, Killearn Lakes Unit I experienced a history of failures with on-site sewage disposal systems. The failures were promoted by problems with the "sheet flow" drainage system and its patterns of dispersion of storm water runoff, problems of soil permeability and abnormally high wet season water tables, referred to as perched water tables. This resulted in sewage backing up into homes and flowing out onto the ground in the yards of the residences, into streets and onto adjacent neighbors' lots. The problems experienced were widespread within the Killearn Lakes Unit I. This seepage of raw sewage presented a health hazard, as it would on any occasion. Among the residences confronted with this dilemma was Lot 5, Block X, adjacent to the subject lot. Persons residing in that home had to undertake alternative means of on-site sewage disposal to have that system function properly. This included relocation of the apparatus, mounding, use of an aerobic system, and use of pumps to insure that the waste being disposed did not back up into the conveniences within the home. Witnesses who appeared at the hearing described the series of corrections in some detail. Those witnesses included a former owner of that residence and others who had a technical understanding of the problems in that system. The problems in Killearn Lakes Unit I related to on-site sewage disposal systems became so extreme that the Leon County Commission declared a moratorium on the installation of on-site septic tanks in that development. This occurred in 1987. In order to better understand the problems in the Killearn Lakes subdivision, to include Killearn Lakes Unit I, a study was commissioned. That report is referred to as Killearn Lake Waste Water Disposal Study of June, 1987. A copy of the report is found as Respondent's Exhibit 6 admitted into evidence. It was prepared for the Leon County Board of County Commissioners and prepared by the Leon County Public Health Unit with the assistance of the Leon County Department of Public Works, Leon County Building Department, Ochlockonee River Soil and Water Conservation District, Northwest Florida Water Management District, Tallahassee-Leon County Planning Department, Florida Department of Health and Rehabilitative Services, and Florida Department of Environmental Regulation. Some of the highlights of that report concerned the observation that the septic tank systems do not work adequately and that the more systems that are placed the greater the problems. It noted that the nature of the drainage system in this area is a contributing factor to the failures. The soil's poor permeability, relating to the Dothan series of soils in the area which have slow permeability, contributed to the problem. Perched water tables were found above the expected levels for the wet season water tables. They also presented a problem, as did excessive slopes in some areas. In particular, it was noted that 80% of the lots sampled in Killearn Lakes Unit I had severe limitations on the use of on-site sewage disposal systems. Ninety-three per cent of the lots sampled in Block X received excess runoff from other lots and roads at higher elevations. It was noted that French or curtain drains alone would not significantly reduce perched water table complications because of the low permeability of the soils. It was reported that the overall housing density of Killearn Lakes is not particularly high, but the individual lots are small, approximately 1/4 acre in size. This, taken together with the fact that the "sheet flow" concept of storm water management contemplates that the runoff will cascade across the terrain conforming to its contours, means that some small lots will be inundated. This uncontrolled runoff contributes to septic tank problems in that the tanks fail when the soils around them become saturated. The report notes that if there was a different designed drainage system, the impact on septic tanks would be less. The report notes that if something is not done to modify storm water runoff, drainage problems will persist. Consequently, septic tank failures will continue to occur. Concerning the water tables, the soil testing, which was done in Killearn Lakes Unit I, in which the predominant soil is Dothan type, demonstrated that the borings which located mottling of the soils at the expected level of the wet season water table were inaccurate. These indicators did not correspond to reality in that the true water tables were found 12-20 inches above the expected level of the average high water, as seen in the mottling. This phenomenon was revealed in 42% of the lots evaluated which had Dothan soils. The report recommended, among other measures, that no new sewage disposal system permits be issued in Killearn Lakes Unit I until a storm water system had been constructed and demonstration made that the system would collect storm water and thereby lower the perched water table on specific lots under review. The ultimate response to the question of permits for on-site sewage disposal systems in Killearn Lakes Unit I was spoken to in a Resolution of July 14, 1987 entered by the Leon County Board of County Commissioners. A copy of the resolution may be found as Respondent's Exhibit 1 admitted into evidence. It was resolved that the permits for on-site septic disposal systems be reviewed by the Leon County Public Health Unit on a case-by-case basis in accordance with criteria announced at Chapter 10D-6, Florida Administrative Code. This effectively lifted the moratorium. The subject request for installation of an on-site sewage disposal system was reviewed in keeping with the policy decision set forth in the resolution. Respondent's Exhibit 6 admitted into evidence includes a copy of a survey made by the Homeowners' Association for Killearn Lakes, also admitted as Petitioner's Exhibit 1. As part of the study commissioned by the Leon County Board of County Commissioners, it has some relevance in portraying the dimensions of the problem. Those dimensions are better understood by resort to the color scheme which is found in Petitioner's Exhibit 1. It depicts the problem lots in red color, those lots without problems in green color, and the lots upon which no report was made in orange color, as well as vacant lots, to include the subject lot, which have no color scheme. This latter category indicates no participation in the survey. The door-to-door personal survey conducted by Rod Moeller and testified about at hearing does not diminish the impression of the seriousness of the problem with on-site sewage disposal system failures in Killearn Lakes Unit I, which the 1987 study by the Leon County Board of County Commissioners identified. This survey by Mr. Moeller was in a limited area, more specifically related to the portion of Killearn Lakes Unit I nearby the subject lot. The findings of the 1987 study commissioned by the Leon County Board of County Commissioners are accepted as accurate. Eanix Poole, Administrator of Environmental Health for the State Health Office testified at the hearing. He pointed out that the failure rate in the subdivision under question for on-site sewage disposal systems is 25%, as contrasted with the statewide rate of less than 1/2%. He identified the fact that those failures relate to backups within the home and seepage onto the ground. He verified that these events constitute health problems, especially given the number of failures. He sees the lot in question here as being particularly vulnerable to problems given the drainage patterns and its location at the bottom of two hills. The lot in question receives runoff from the two adjacent lots as well. Mr. Poole sees the subject lot as more vulnerable in the wet season and does not believe that any alternatives that are available for placement of the system on the site would sufficiently alleviate the potential failure of the system to make it a successful arrangement. What he sees is a lot in the path of a natural drainage of tremendous quantities of storm water runoff, coupled with poor soil conditions related to soil absorption or permeability in an area where on-site sewage disposal systems have failed. He remarks that dry soils are needed to treat the sewage and that treatment cannot take place in a saturated soil environment. The effects of seepage of the sewage, according to Mr. Poole, is one which can degrade ground water. Mr. Poole is also concerned that the installation of the proposed on-site sewage disposal system above ground will have an adverse impact on the adjacent lots, one of which has already experienced problems. That refers to Lot 5, Block X. These observations by Mr. Poole, as reported, are accepted. Raymond Collins, an environmental administrator with the Respondent's health program office, also testified at the hearing. He is intimately aware of the problems in Killearn Lakes Unit I. Those problems began to occur in the winter of 1986 and continued into 1987. This related to problems with toilets and the seepage of effluent which was running onto people's property and into the streets. He notes a similar failure rate in Killearn Lakes Unit I to that observed by Mr. Peel when contrasted with the experience statewide. In the aforementioned period he received calls and reports from homeowners concerning system failures. In effect what was happening was that the on-site drain fields in Killearn Lakes Unit I would not accept more input and the raw sewage would bubble up and leach out onto the ground. He personally observed a dozen sites which had failures. He was responsible for the coordination of the July, 1987 study which has been mentioned. As a result of that study one of the steps which he took was to advise that staff investigating the permit application requests should elevate the estimation of the wet season water table by 12-20 inches. Mr. Collins agrees with the recommendation of the individual who was assigned to evaluate the application for permission to install an on-site sewage disposal system at the subject lot, who recommended that the application be turned down. Mr. Collins' description of the experience at Lot 5, Block X, related to his knowledge that the initial system had been replaced with an aerobic system, which also proved to be an inadequate on-site sewage disposal system. In 1988, he went to the home of the person living on that lot, and the aerobic system was not working. There was a light rain on that day, and there were problems in the drain-field area. When a soil boring was made to a depth of two feet effluent poured out. The perched water table had risen to a point in the bottom of the drain field, such that when a hole was punched, it provided a conduit for pressure to be relieved. The drain field that was experiencing this problem was not the original drain field. It was a replacement drain field. The drain field being observed was in the front of the lot, right below the ground. The suggestion to alleviate the problem was to move the drain field to the side of the yard and elevate it and install a series of small-diameter pipes. A pump was also needed to move effluent into the drain field, thus, avoiding a backup of the system into the home. He is unaware of any recent failures in the system at Lot 5, Block X. Mr. Collins emphasized the need for soil to remain unsaturated to provide effective treatment and that 24 inches of unsaturated soil is the minimum amount which would be acceptable. Mr. Collins commented about the nature of the subject lot and the fact that other lots drain through it. Mr. Collins commented that the design of the proposed septic tank does not assure success in the treatment of the waste disposed. Unlike the expert of the Petitioner, Mr. Peel, the problem is not that solids are blocking up the system. It is the failure of the soils to accept the volume of water which is being released from the chambers of the septic tank into the drain field. Mr. Collins does not believe that the use of water-saving appliances in addition to the limited size of the home to be built on the subject lot, installation of an aerobic system, and installation of an above-ground system, as proposed, would be successful and not pose a health risk from system failure. The problems would continue to be drainage patterns and poor soils. His remarks, as reported, are accepted as accurate. Terese A. Hegg, Environmental Specialist I with the Respondent's Leon County Public Health Unit, reviewed the application for variance to install the on-site sewage disposal system. She was familiar with the history of problems in Killearn Lakes Unit I before undertaking this assignment and has made more than 50 evaluations in that development. She observed that the "sheet flow" drainage of storm water does not provide reasonable management because it does not drain normally. She is aware that the wet season water table is as much as 20 inches above the normal indicators, as seen through mottling. Her analysis of this site is under the auspices of those requirements announced in Chapter 10D-6.044, Florida Administrative Code, having in mind that the subdivision plat was made before 1972. This includes an examination of the soil characteristics, history of flooding, and water table evaluations. At this site, she noted the poor permeability of the soil. She did soil borings to confirm the nature of the soils and to identify the water table. She took into account the abnormal perched water table that is above what the mottling would indicate as being the wet season water table. Ms. Hegg is concerned that the system on the adjacent lot, which is now functioning adequately, would not function adequately if the subject system was installed. She noted that the drainage pattern from the neighboring lots was toward the subject lot and that water would come from the left and the right lots adjacent to this lot, corresponding to Lots 5 and 3 as you face them. The drainage pattern would then proceed beyond Lot 4 and into a green area. In making her assessment of this application, she was aware of the problems with the on-site sewage disposal system at Lot 5, Block X. The appearance of saturated soil in the entire length of the boring and standing water on the lot is an indication of problems with percolation. The effluent will flow out and onto the ground if these soils are saturated. From her observations and based upon the history of Killearn Lakes Unit I and its failures regarding on-site sewage disposal systems, Ms. Hegg does not believe that the proposed system would successfully address sewage treatment and would promote a risk of on-site sewage disposal system failures for adjacent lots. Ms. Hegg acknowledged that the storm water flows could be diverted; however, she points out that the subsurface water cannot be diverted. Her account of this site and the acceptability of the request for variance as reported is accepted as accurate. Given the soil conditions and the wet season water table expected at this site, the proposed system will not present an adequate unsaturated soil depth for treatment of the sewage and untreated sewage may be expected to seep or leach out onto the ground. On May 22, 1990, Mr. Collins had written to Dr. Richard G. Hunter, Assistant Health Officer for Environmental Health, recommending the denial of the variance request. A copy of that correspondence may be found as Respondent's Exhibit 7 admitted into evidence. It details reasons which are similar to those described in this Recommended Order. As a consequence, even though the Advisory Review Variance Board had looked with favor upon the request for variance, that variance was denied by action of Dr. Hunter on May 30, 1990, which relied upon the insights of Mr. Collins, as described in his May 22, 1990 correspondence. A copy of the letter of denial may be found as Respondent's Exhibit 8 admitted into evidence. The purpose of this hearing was not to examine whether Respondent had abused its discretion in denying the variance. The reason for the hearing was to allow the parties to present their points in an adversarial setting, which allowed each party to explain its viewpoint anew. That was done, and the analysis provided by this recommended order ensued. In deciding the facts, these representations have been made with due regard to the remarks of James Earl Peel, an expert in the design of on-site sewage disposal systems, who had on his staff, Gary L. Wood, P.E. His methods in analyzing the issue of the suitability of the installation of an on-site sewage disposal system at the subject site do not coincide with the methods contemplated in Chapter 10D-6, Florida Administrative Code, which controls. This is especially significant in his approaches to soil characteristics and location of the wet season water table. As noted above, his belief that the problem is one of distribution of solids from the septic tank into the drain field overlooks the more significant problem of water volume discharge from the septic tank into the drain field. In fact, Mr. Peel indicated that he is unfamiliar with the requirements of septic tank design, as described in Chapter 10D-6, Florida Administrative Code. On balance, Mr. Peel's reports, in Petitioner's Exhibits 3 and 4 admitted into evidence and his in-hearing testimony, do not persuade that the system he recommends can be successfully operated at the subject site. His presentation and the overall presentation of Petitioner do not create a reasonable expectation that the system will not fail and create health hazards for the residents of Lot 4, Block X, and others in the vicinity. It is recognized that this lot owner faces a hardship that was not caused by Petitioner. It is also recognized that, pursuant to the stipulation of the parties, there is no intention by any entity to install a community system of sewage disposal. It is further recognized that there are no alternative methods that would seem to be successful in addressing the problem of the treatment of the sewage, as related in the previous findings. On the other hand, the discharge that could be expected from this subject system would bring about a condition in which the effluent presented a health risk to this applicant and other members of the public and has the potential to significantly degrade the ground or surface waters, although this latter circumstance has not been documented on other occasions and was not found to exist in the July, 1987 study commissioned by the Leon County Board of County Commissioners. In that report, it was specifically found that the surface water had not been compromised by the on-site sewage disposal system failures described in the overall report.
Recommendation Having considered the foregoing Findings of Fact, Conclusions of Law, the evidence of record, the candor and demeanor of the witnesses, and the pleadings and arguments of the parties, it is therefore, RECOMMENDED that a Final Order be entered denying Petitioner's request for variance from permit requirements and permission to install an on-site sewage disposal system at Lot 4, Block X, Killearn Lakes Unit I. DONE AND ENTERED this 20th day of November, 1990, in Tallahassee, Leon County, Florida. CHARLES C. ADAMS, Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 20th day of November, 1990. APPENDIX TO RECOMMENDED ORDER IN CASE NO. 90-4456 The following discussion is given concerning the proposed facts of the parties: In the discussion of the testimony of Mr. Poole, the relevant portions of that testimony are reflected in the facts found in this recommended order. Under the heading of testimony said to be attributable to Ms. Hegg, at paragraph 1, while it is recognized that a system might be installed that might not call for diversion of storm water onto adjacent neighbors' properties, the problem on site would remain and would be sufficient reason to reject the application. Moreover, it is not clear that it is the intention to install a system that would divert storm water from adjacent properties. Paragraph 2 under this heading is rejected in its notion that storm water would not have an influence on the proposed system. Paragraph 3 is rejected. Paragraphs 4 and 5 do not lead to the conclusion that sufficient unsaturated soils would be available for the treatment of disposed sewage during the wet season, nor does the representation at paragraph 6. Paragraph 7 under that heading is contrary to facts found. The paragraphs under the reference to James Earl Peel, in those five paragraphs, while accurately portraying the opinion of Mr. Peel and Mr. Wood, does not lead to the conclusion that the application should be granted. Under the heading "Rod Moeller" in the first paragraph, the information provided at hearing and under weather reports does not satisfactorily establish what the rainfall circumstance may have been at the subject property 72 hours before January 24, 1990, as referred to in paragraph 1, nor can it be said that the rain experienced in the overall area contemplated by the attached weather report to the argument by Petitioner was a 25-year storm event. The comment at paragraph 3 under this category that the on-site sewage disposal systems in neighboring lots are functioning fine since modifications in the advent of hurricane "Kate" is contrary to facts found. Under the heading "Ray Collins" in paragraph 1, this proposed fact has no relevance in that the question is the appropriate function within Killearn Lakes Unit I, not at an undisclosed site away from that area. Respondent's Facts These facts are subordinate to facts found. Copies furnished to: Sam Power, Department Clerk Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, FL 32399-0700 Linda K. Harris, Esquire General Counsel Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, FL 32399-0700 Rod Moeller, Authorized Representative Mallard Cove Construction 14261 Buckhorn Road Tallahassee, FL 32312 John L. Pearce, Esquire HRS District 2 Legal Office 2639 North Monroe Street Suite 125-A Tallahassee, FL 32399-2949
The Issue The issue in this case is whether the Variance Review and Advisory Committee and the Department of Health had just cause to disapprove Petitioner's application for a variance.
Findings Of Fact The Department of Health (DOH) is the agency responsible for oversight of the on-site sewage treatment and disposal systems program and the Variance Review and Advisory Committee which meets monthly to recommend agency action on variance requests pursuant to Chapter 381, Florida Statutes. In August 1999, Petitioner applied to the DOH for a second variance to extend a variance previously granted in June 1999, to use an existing septic system for six months. Petitioner's application for the second variance stated that county sewer would be available in 2001, and she would be required to hook into the sewer. Therefore, Petitioner wanted an extension to continue using the existing undersized septic system until the sewer was available. She also attached water usage records for June 1998 through July 1999, for her property. Petitioner owns the commercial property served by the septic system and located on Howland Boulevard in Deltona, Florida. The property consists of a strip mall with five offices and one restaurant. The property originally contained six office spaces in 1990, when Petitioner applied for a permit to install a septic system to handle the building's sewage flow. See Petitioner's Exhibit No. 1. Petitioner was granted a construction permit for the septic system on August 14, 1990, which contained the statement: "no food service operations permitted in this building." Prior to May 1999, Petitioner leased an office in her commercial property to Milagros Martinez to operate a sandwich shop. Ms. Martinez applied to DOH for approval to use Petitioner's existing septic system to handle her sandwich shop sewage, and was denied because of increased water use and septic system demands of a restaurant. Petitioner's septic system contains a 750-gallon tank with 162 square feet of drainfield. In order to handle the additional sewage generated by the sandwich shop, the Florida Administrative Code requires a 1350-gallon tank and a drainfield of 787 square feet. There is enough room on Petitioner's property to install a separate septic system to handle the sewage generated from the sandwich shop. Petitioner applied to DOH for her first variance in May 1999, requesting to utilize the septic system to handle the waste from the sandwich shop. Petitioner appeared before the DOH Variance Review and Advisory Committee in June 1999. The committee recommended, and DOH concurred, to approve the first variance with four provisos. See DOH Exhibit No. 2. The four provisos were: The applicant shall obtain and maintain an annual onsite sewage treatment and disposal system operating permit in accordance with subsection 64E-6.003(5), F.A.C. The owner shall maintain an annual contract with a licensed septic tank contractor to inspect and service the onsite sewage treatment and disposal system at least once per month or more frequently as necessary. This variance allows operation of the sandwich shop for no more than six months. During that six months, the applicant shall take all necessary steps to increase the capacity of the system to accommodate the additional 230-gallon sewage flow from the sandwich shop. At the end of the six months, the system shall be in compliance or the sandwich shop shall be closed and remain closed until compliance is achieved. The four provisos were additionally explained to Petitioner in a letter dated July 14, 1999, from Sharon Heber, Director of the DOH Environmental Health Division. See DOH Exhibit No. 1. Petitioner accepted the provisions of the first variance on July 20, 1999. See DOH Exhibit No. 4. Petitioner does not have a current annual on-site sewage treatment and disposal system operating permit as required by the first proviso. Petitioner did not contract with a licensed septic tank contractor to inspect and service her system at least once per month as required in the second proviso. Petitioner called a contractor to inspect her system four times in the six-month period since the first variance was granted. Within six months, Petitioner did not take the necessary steps to increase the capacity of her septic system to handle the additional flow as required by the third proviso of the first variance. The system is not in compliance and the sandwich shop is not closed as stated in the fourth proviso. In August 1999, Petitioner filed for a second variance requesting that the first variance be extended until year 2001. That is the date the county plans to install a sewer line on Howland Boulevard in Deltona, which will serve her commercial property. She submitted a letter from the Volusia County Public Works Service Center stating that the "sewer service is planned to be available sometime in the year 2001." See Petitioner's Exhibit No. 4. The Variance Review and Advisory Committee considered Petitioner's request at their September meeting. The variance committee unanimously denied Petitioner's request for a second variance. The Petitioner's system was not designed to handle an increased amount of sewage flow, and that it would eventually collapse or fail. The committee's approval of the first variance was to allow Petitioner adequate time to install the necessary septic system for the restaurant, and not put Petitioner in the position of telling her tenant she could not open her restaurant. See DOH Exhibit No. 5. When Petitioner's existing system fails, sewage will pond on the ground. The ponding fluid will consist of raw sewage. The leaking/ponding sewage may seep into the groundwater and then into drinking water aquifers. In the right conditions, this pollution can cause the spread of waterborne diseases such as typhoid and cholera, or viral infections, such as hepatitis A or polio.
Recommendation Based upon the findings of fact and conclusions of law, it is RECOMMENDED: That the Department of Health enter a final order affirming the decision of the Variance Review and Advisory Committee and the Department of Health to disapprove Petitioner's second variance application. DONE AND ENTERED this 17th day of April, 2000, in Tallahassee, Leon County, Florida. STEPHEN F. DEAN Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 17th day of April, 2000. COPIES FURNISHED: Connie Biancardi 2820 Howland Boulevard Deltona, Florida 32725-1606 Charlene J. Petersen, Esquire Department of Health Volusia County Health Department 420 Fentress Boulevard Daytona Beach, Florida 32114 Angela T. Hall, Agency Clerk Department of Health Bin A02 2020 Capital Circle, Southeast Tallahassee, Florida 32399-1703 William Large, General Counsel Department of Health Bin A02 2020 Capital Circle, Southeast Tallahassee, Florida 32399-1701 Dr. Robert G. Brooks, Secretary Department of Health Bin A02 2020 Capital Circle, Southeast Tallahassee, Florida 32399-1701
The Issue Whether the proposed Florida Administrative Code Rules 28-20.110, 28-20.120, and 28-18.210 are invalid exercises of delegated legislative authority.
Findings Of Fact Parties Petitioner, Florida Keys Citizens Coalition, Inc. ("FKCC"), is a non-profit Florida corporation whose address is 10800 Overseas Highway, Marathon, Florida 33050. The primary purpose of FKCC is to "protect the quality of life of the citizens of the Florida Keys." The primary emphasis of the organization involves issues related to the carrying capacity, the limits of the infrastructure, and the environmental qualities of the Florida Keys. Consistent with its purpose, FKCC opposes regulations which it believes will diminish the quality of the natural habitat in Monroe County and the City of Marathon and hinder safe and efficient emergency evacuation. FKCC has been involved in previous Monroe County litigation, including participating as a party to at least two formal administrative challenges to the 2010 Monroe County Comprehensive Plan (Monroe County Comprehensive Plan). Petitioner, Last Stand, Inc., is a non-profit Florida corporation whose address is Post Office Box 146, Key West, Florida 33041-0146. The primary purpose of Last Stand is to preserve and protect the quality of life in the City of Key West, the Florida Keys, and their environs, with particular emphasis on the natural environment. To that end, Last Stand opposes regulations that it believes diminishes the quality of the natural habitat in the Florida Keys and regulations that hinder safe and efficient emergency evacuation in the Florida Keys. Last Stand is an organizational member of FKCC. Moreover, many individual members of Last Stand are also members of FKCC. A substantial number of members of both FKCC and Last Stand live, work, and/or engage in various recreational activities in the City of Marathon or in nearby areas. For example, a substantial number of members of both of those organizations regularly use and enjoy the nearshore waters of Monroe County for recreational water activities, such as boating, diving, snorkeling, and/or swimming.3 A substantial number of members of both organizations also regularly use and enjoy terrestrial habitats in Monroe County, including the City of Marathon, for recreational activities such as hiking and bird-watching. A substantial number of the members of both FKCC and Last Stand may be adversely affected or impacted by the issues which are in dispute in this proceeding. Moreover, the issues in this proceeding are germane to the purposes of both FKCC and Last Stand. Also, both FKCC and Last Stand regularly represent their members' interests in formal administrative hearings and local commission meetings relative to environmental and growth management issues. Respondent, Administration Commission, consists of the Governor and Cabinet and is empowered to adopt, by rule, any enactment, amendment, or rescission of a land development regulation or element of a local comprehensive plan in the Florida Keys area. Respondent, Monroe County, is a local county government within the Florida Keys Area of Critical State Concern ("ACSC"). Respondent, City of Marathon, is a municipality within the Florida Keys ACSC. Intervenor, the DCA, is the state land planning agency responsible for the general supervision of the administration and enforcement of the ACSC program. As the state planning agency, the DCA is authorized to propose changes to local comprehensive plans and land development regulations within an ACSC for adoption by the Administration Commission. Economic Base of Florida Keys Tourism is the economic base of the Florida Keys. Moreover, the basis for the Florida Keys' tourism is a healthy natural environment that supports fishing, diving, water sports, boating, bird-watching habitat, visiting endangered species habitat, and other related activities. History of the Florida Keys ACSC The Florida Keys area is designated as an ACSC and consists of, unincorporated, Monroe County, the City of Layton, the City of Key Colony Beach, the Village of Islamorada, and the City of Marathon. See § 380.0552(3), Fla. Stat. (2004).4 The City of Key West has been separately designated as an ACSC pursuant to Florida Administrative Code Rule Chapter 28-36. The Florida Keys were originally designated by the Administration Commission in 1975 and re-designated by the Legislature in 1986. The legislative intent section and the Principles for Guiding Development, as set forth in Subsections 380.0552(2) and (7), Florida Statutes, together require an effective land use management system that protects the natural environment and character of the Florida Keys, maintains acceptable water quality conditions, ensures adequate public facility capacity and services, provides adequate affordable housing, supports a sound economic base, protects constitutional property rights, and requires adequate emergency and post- disaster planning to ensure public safety. During the past 20 years, the growth management process has been implemented in essentially two phases. The first phase involved developing, adopting, and implementing the first comprehensive plans and regulations under the new designation. These plans and regulations were adopted by the county and cities in the mid-1980s. The 1986 plan established a growth management system that substantially increased protection of natural resources and began to reduce the over-allocation of density in the Florida Keys. It also achieved the long-term protection of North Key Largo. However, several major problems were not adequately addressed by the 1986 plan, including maintaining evacuation capability, water quality protection, sewage treatment, stormwater treatment, and community character. In addition, although the plan required a focal point plan for Big Pine Key, this planning process did not result in a viable plan that adequately protected the Florida Keys deer. The required open space ratios proved difficult to maintain within habitats once development occurred, resulting in fragmentation of habitat. The second phase involved the planning process undertaken in the early 1990s to meet the requirements of the Growth Management Act and to update the plan based on lessons learned in implementing the 1986 plan. In developing, reviewing, and litigating the Monroe County Comprehensive Plan, the following critical issues emerged involving how to: maintain acceptable hurricane evacuation capability; retrofit existing development and provide new development with adequate wastewater and storm water facilities, including, where appropriate, upgrading of on-site systems; determine the carrying capacity of the Keys to withstand the impacts of additional land development and modify state and local plans, regulations and programs so that the carrying capacity is not exceeded; provide an adequate supply of affordable housing while maintaining acceptable hurricane evacuation and protecting the environment. In 1996, the Administration Commission adopted a rule which included a cap of 255 residential units per year for Monroe County. The rule also adopted a five-year Work Program into the Monroe County Comprehensive Plan with the local governments to construct sewage treatment facilities, replace cesspits, and purchase land to protect natural habitat. Monroe County, the City of Marathon, and the DCA were required to submit reports to the Administration Commission each year "documenting the degree to which the Work Program objectives for that year [had] been achieved." The rule contemplated that if the local governments did not make "substantial progress" towards accomplishing the tasks of the Work Program, the unit cap for new residential permits would be reduced by at least 20 percent for the following year. The Administration Commission found a lack of "substantial progress" in 1999 and adopted a rule which reduced the annual allocation of residential permits by 20 percent and extended the five-year Work Program to seven years. The Administration Commission found "substantial progress" had been accomplished in 2001 and began rulemaking to restore the permit allocation. However, the rule was challenged, and since the Administration Commission found a lack of "substantial progress" in 2002, the Commission adopted a revised rule which did not restore permits. The Carrying Capacity Study The 1996 Administration Commission rule amended the Monroe County Comprehensive Plan to require the completion of a carrying capacity analysis. The carrying capacity analysis shall be designed to determine the ability of the Florida Keys ecosystem, and the various segments thereof, to withstand all impacts of additional land development activities. The analysis shall be based upon the findings adopted by the Administration Commission on December 12, 1995, or more recent data that may become available in the course of the study, and shall be based upon the benchmarks of, and all adverse impacts to, the Keys land and water natural systems, in addition to the impact of nutrients on marine resources. The carrying capacity analysis shall consider aesthetic, socioeconomic (including sustainable tourism), quality of life and community character issues, including the concentration of population, the amount of open space, diversity of habitats, and species richness. The analysis shall reflect the interconnected nature of the Florida Keys' natural systems, but may consider and analyze the carrying capacity of specific islands or groups of islands and specific ecosystems or habitats, including distinct parts of the Keys' marine system. (Ref. 1991 Stip. Settlement Agreement). Agencies: County, DCA, DEP, DOH, DOT, GFC, SFWMD, NMS, SFRPC, EPA, USFWS, Army COE, and other interested parties to include representatives of environmental organizations and development interests. The Florida Keys Carrying Capacity Study ("FKCCS") was completed over a period of six years. Six million dollars was allocated by the DCA and the United States Army Corps of Engineers to produce the Monroe County Sanitary Wastewater Master Plan, the Stormwater Management Plan, and the FKCCS. The contractor, URS Corporation, completed the FKCCS and the Carrying Capacity/Impact Assessment Model ("CCIAM"), a separate component to be used in forecasting land use scenarios. A panel of external experts was used to peer review the scope of work. In September 2002, the study was completed. The National Research Council of the National Academy of Sciences ("Council") reviewed the CCIAM and FKCCS and, as a result of its review, adjustments were made to the CCIAM. The Council's review concluded that overall, due to data constraints and other issues in certain portions of the CCIAM, the model proved insufficient to develop a comprehensive carrying capacity framework that would allow for undisputable determinations of whether future development scenarios fall within the carrying capacity of the Florida Keys. The marine module, the most data- deficient, was subsequently removed from the CCIAM. The FKCCS recommended four main guidelines for future development in the Florida Keys: Prevent encroachment into native habitat. A wealth of evidence shows that terrestrial habitats and species have been severely affected by development and further impacts would only exacerbate an already untenable condition. Continue and intensify existing programs. Many initiatives to improve environmental conditions and quality of life exist in the Florida Keys. They include land acquisition programs, the wastewater and stormwater master plans, ongoing research and management activities in the Florida Keys National Marine Sanctuary, and restoration efforts throughout the Florida Keys. If further development is to occur, focus on redevelopment and infill. Opportunities for additional growth with small, potentially acceptable, additional environmental impacts may occur in areas ripe for redevelopment or already disturbed. Increase efforts to manage the resources. Habitat management efforts in the Keys could increase to effectively preserve and improve the ecological values of remaining terrestrial ecosystems. Partnership Agreement While preparing the Assessment Report for 2003, the DCA Secretary concluded that the existing policy direction, consisting of imposition of the Work Program by the Administration Commission and reduction of residential permits, due to lack of substantial progress, was not sufficient to solve the problems facing the Florida Keys. The Assessment Report described difficulties and delays in implementing the Work Program. Most of the sewage treatment facilities contemplated by the Work Program were not constructed and valuable upland habitat continued to be developed. On December 16, 2003, the Administration Commission concluded that Monroe County had not made substantial progress and directed the DCA "to determine changes that would be necessary to the comprehensive plan to fully implement the requirements of the Work Program[,] as well as habitat protection provisions." The Administration Commission also accepted the staff recommendation that it "determine substantial progress has been made for the City of Marathon, and that some permits will be provided back to the City of Marathon," the number to be determined at the Administration Commission's January 27, 2004, meeting. The DCA approached the Florida Keys local governments and community-based organizations and proposed a Partnership Agreement to "begin implementation of the Work Program associated with the Florida Keys Protection Act." The DCA Secretary addressed the governing boards of the Florida Keys' local governments concerning the proposed Partnership Agreement. Monroe County, the City of Marathon, and the Village of Islamorada adopted resolutions supporting the partnership proposal. By letter dated February 25, 2004, the DCA Secretary requested that the Governor, as a member of the Administration Commission, authorize the Administration Commission staff to initiate rulemaking to amend the Comprehensive Plans of Monroe County and the City of Marathon. According to the letter, this action was requested based upon a series of significant commitments made by each of these local governments which addressed issues related to habitat protection, affordable housing, wastewater and stormwater management projects, land acquisition, and nutrient credits. The letter also noted the following: A complete follow-through on these commitments would mean over $410 million would be spent in the coming years to address these issues in the Florida Keys. Habitat protection will be increased, environmentally-sensitive hammock and pinelands would be purchased, new wastewater and stormwater management projects would be initiated, and 230 units of affordable housing would be made available for residents of the Florida Keys. * * * In essence, we have developed proposals that allow additional units primarily for affordable housing in the Florida Keys, but also would ensure the most pressing issues will be jointly addressed by local and state government. Consistent with the February 25, 2004, letter, the Partnership Agreement consists of commitments by the Florida Keys' local governments and several state agencies to address habitat protection, wastewater and stormwater treatment, affordable housing, and hurricane evacuation. At its March 9, 2004, meeting, the Administration Commission accepted the DCA's recommendation to initiate rulemaking to implement the Partnership Agreement. The Proposed Rules 29. Proposed Rules 28-18.210, 28-20.110, and 28-20.120 were published in the Florida Administrative Weekly on July 16, 2004.5 According to the published notice, the purpose of Proposed Rule 28-18.210 is to amend Policy 101.2.14 of the Marathon Comprehensive Plan to address building permit allocations by increasing the annual residential permitting cap and specifying allocations authorized for market rate and affordable housing, restoring certain allocations authorized for market rate and affordable housing, authorizing certain unused rate of growth ordinance allocations to roll forward, and deleting the requirement for nutrient credits upon a date certain. The notice also provides that the Proposed Rule amends the Work Program set forth in Policy 101.2.14 of the Marathon Comprehensive Plan to establish Year Eight and Year Nine to address tasks not yet completed in the original Work Program. The published notice states that the purpose of Proposed Rules 28-20.110 and 28-20.120 is to amend Policy 101.2.13 of the Monroe County Comprehensive Plan to address building permit allocations by increasing the annual residential permitting cap and specifying allocations authorized for market rate and affordable housing, restoring certain allocations previously reduced to be targeted for affordable housing, authorizing certain unused rate of growth ordinance allocations to roll forward, and deleting the requirement for nutrient reduction credits upon a date certain. The notice also provides that the proposed rules amend the Work Program in Policy 101.2.13 of the Monroe County Comprehensive Plan to establish Work Program provisions for Year Eight, Year Nine, and Year Ten to address tasks not yet completed in the original Work Program. Finally, the notice states that the Proposed Rule amendments address the adoption of necessary land development regulations. The published notice cites Subsection 380.0552(9), Florida Statutes, as the specific authority for the Administration Commission's promulgating the Proposed Rules and Section 380.0552, Florida Statutes, as the law implemented. Petitioners challenge portions of Proposed Rule 28-18.210, which will amend the Marathon Comprehensive Plan and portions of Proposed Rules 28-20.110 and 28-20.120,6 which will amend the Monroe County Comprehensive Plan and the Monroe County Land Development Regulations on the basis that they constituted invalid exercises of delegated legislative authority. Petitioners contend that the proposed rules should comply with Section 380.0552 and Chapters 163 and 380, Florida Statutes, and, therefore, should be analyzed for such compliance in this proceeding. Notwithstanding Petitioners contention to the contrary, for the reason stated in paragraph 199 below, Proposed Rules 28-18.210, 28-20.110, and 28-20.120 will be analyzed based on their consistency with Section 380.0552, Florida Statutes, because that is the provision which the proposed rules explicitly purport to implement. The published notice does not specify the subsection of Section 380.0552, Florida Statutes, that the proposed rules implement. However, the parties agree that the proposed rules must be consistent with Subsection 380.0552(7), Florida Statutes, which set forth the Principles for Guiding Development. Restoration/Increase of ROGO Allocations The Comprehensive Plans for Monroe County and the City of Marathon include a Permit Allocation System, under which Monroe County was originally allocated 255 permits per year for new residential units. As noted in paragraph 18 above, in 1999, the Administration Commission determined that substantial progress on the Work Program had not been accomplished and adopted a rule reducing the annual allocation of permits by 20 percent. After the incorporation of the Village of Islamorada and Marathon, and a voluntary reduction by the Village of Islamorada, the current annual allocation of residential development permits is 158 for Monroe County, 24 for Marathon, and 14 for the Village of Islamorada. Proposed Rule 28-20.110(1) amends Policy 101.2.13 of the Monroe County Comprehensive Plan by increasing the annual unit cap of 158 to 197, thereby restoring the original level of permits issued for new residential development under the Rate of Growth Ordinance ("ROGO"). The proposed rule requires that "[e]ach year's ROGO allocation of 197 new units shall be split with a minimum of 71 units allocated for affordable housing in perpetuity and market rate allocations not to exceed 126 new units per year." Proposed Rule 28-18.210 amends Policy 101.2.14 of the Marathon Comprehensive Plan by increasing the maximum number of permits for new residential units from 24 to 30 per year, thereby, restoring the original level of permits per year for new residential development under ROGO. The proposed rule requires that "[e]ach year's ROGO allocation of 30 units shall consist of 24 market rate and 6 affordable units" and that the affordable housing "remain as affordable housing in perpetuity." In addition to restoring the number of permits for new development to the original levels, Proposed Rule 28-20.110 amends the Comprehensive Plans of Monroe County and Marathon to restore available permit allocations that were unused in previous years and to allow unused ROGO allocations to be allocated in subsequent years. Proposed Rule 28-20.110 adds a new provision to the Monroe County Comprehensive Plan, providing that "effective July 12, 2004, 140 ROGO allocations, which represent unused reductions for ROGO Years Nine through 12, and 25 units lost in Year Ten due to lack of nutrient credits, are reallocated to the County exclusively for affordable housing purposes." Proposed Rule 28-18.210 adds a provision to the Marathon Comprehensive Plan that "effective July 12, 2004, 65 ROGO allocations, which represent unused ROGO allocations for ROGO Years 9 through 12, are to be reallocated to the City exclusively for affordable housing." Advancing/Borrowing Nutrient Credits The existing Comprehensive Plans of Monroe County and the City of Marathon include a nutrient credit system. According to the Monroe County Comprehensive Plan, nutrient reduction credits are earned when existing treatment systems are upgraded. The amount of nutrient reduction credits earned correlate to the type of treatment system to which an old system is upgraded. Thus, if a treatment system is upgraded to the "best centralized system" or the "advanced wastewater treatment system," Monroe County would earn the most nutrient credits possible. For example, elimination of a cesspit by connection to a centralized advanced wastewater treatment system earns 1.5 nutrient credits, and the elimination of a substandard on-site disposal system by connection to a centralized secondary treatment system earns 0.5 nutrient credits. Under the existing Comprehensive Plans of Monroe County and the City of Marathon, development permits for new residential development can only be issued if a nutrient reduction credit has been earned. The requirement that adequate nutrient credits be earned prior to issuance of permits is to mitigate for nutrient impacts of new residential development. However, Proposed Rules 28-18.210 and 28-20.110 provide that Monroe County and the City of Marathon will be permitted to "borrow" nutrient credits from the pool of nutrient credits that are anticipated from the construction and/or completing of sewage treatment facilities. The existing Comprehensive Plans of Monroe County and the City of Marathon provide that nutrient reduction credits are earned by the construction of the Little Venice system according to the schedules prescribed in the Comprehensive Plans. The schedules in the Comprehensive Plans provide that "213 of the total credits estimated to be available from the full operation of the system shall be earned when the wastewater permit is issued, the design/build contract for the system has been fully executed and construction of the system has commenced." The Comprehensive Plans also provide that all the remaining available credits shall be earned when the construction of the Little Venice System is complete, the collection system lines have been installed, and the final total of credits available from the operation of the systems has been calculated. Proposed Rules 28-20.110 and 28-18.210 amend the Comprehensive Plans of Monroe County and Marathon by allowing 213 of the total credits estimated to be available from the full operation of the Little Venice system to be earned, effective July 13, 2003. The proposed rules also provide that when the Little Venice system is completed, "[t]he total credits available shall be reduced by the 213 [credits] advanced in the year 2003." Proposed Rule 28-20.110 amends the Monroe County Comprehensive Plan by allocating 41 nutrient credits for market rate units and 193 nutrient credits for affordable housing units to Monroe County. The Proposed Rule 28-20.110 provides that the 41 nutrient credits will be subtracted from the nutrient credits subsequently earned from hookups to the Key West Resort Utilities Wastewater Facility ("Key West Resort Utilities"). The 193 nutrient credits will be subtracted from hookups to the Key West Resort Utilities, Bay Point, and Key Largo Wastewater Facilities. Repeal of Nutrient Reduction Provision As described in paragraph 42 above, the existing Comprehensive Plans of Monroe County and the City of Marathon have mandatory nutrient provisions that require nutrient credits to be earned prior to issuance of a permit for new residential units. Proposed Rules 28-20.110 and 28-18.210 amend the Comprehensive Plans of Monroe County and the City of Marathon by repealing the mandatory nutrient credit provisions. Pursuant to the proposed rules, "effective July 13, 2005, no nutrient credits shall be required if the local government has made satisfactory progress as determined by the Administration Commission in meeting the deadlines established by the Work Program as adopted by rule after March 15, 2004." Challenges to Increase/Restoration of Permits, Advancing Nutrient Credits, and Repeal of Nutrient Reduction Provision Petitioners contend that the increase in new residential permits is arbitrary and capricious and contravenes the law implemented because it will increase development even though the identified thresholds for growth in the Florida Keys--water quality, terrestrial habitat, and evacuation times-- have been exceeded and will "worsen" the water quality. Petitioners challenge the provision which allows the borrowing or awarding of nutrient credits before wastewater projects are completed as arbitrary and capricious, because it will allow a net increase in the nutrient impacts into the nearshore waters of the Florida Keys and will "worsen" the water quality. Proposed Rules 28-20.110(1) and 28-18.210 increase the number of permits for new residential units from the preceding years. However, the number of permits to be issued under the Monroe County Comprehensive Plan has not increased. Rather, the permits will be issued in a shorter time frame and without being subject to the previous conditions. Even though increased development could result in an increase in the nutrient impacts into the nearshore waters of the Florida Keys, the adverse effect of such nutrient loading is offset by the adequate treatment of wastewater and stormwater runoff. To address the problem of nutrient loading, the Proposed Rules 28-20.110 and 28-18.210 extend the years of the Work Programs and include in those programs tasks, such as construction and completion of wastewater facilities, as well as financing for those projects. Based on the commitments of Monroe County and the City of Marathon in the Partnership Agreement, there is a reasonable expectation that the projects included in the Work Program of the Proposed Rules will be completed. When completed, the wastewater treatment facilities will provide nutrient credits. In anticipation of the completion of the wastewater treatment facilities, Proposed Rules 28-20.110 and 28-18.210 restore the annual permits for new residential units to their original levels and allow previous unused ROGO allocations to be allocated. The Proposed Rules provide that the nutrient credits for these allocations will be borrowed from the pool of nutrient credits that are anticipated from the planned construction and completion of wastewater facilities. Petitioners' contention that the repeal of the mandatory nutrient reduction credit provision is arbitrary and capricious and contravenes the law implemented because such repeal allows the water quality to worsen, is inconsistent with the "no net nutrient" provision of the Comprehensive Plans and is unjustified given that the nutrient pollution has increased since the nutrient credit provisions were adopted. Petitioners also contend that the repeal of the nutrient credit provision is arbitrary and capricious because the repeal is effective on a date certain without further action and without regard for whether it is justified. Proposed Rules 28-20.110 and 28.18-210 repeal the mandatory nutrient reduction credit provisions of the Comprehensive Plans, but the condition precedent to the repeal is the Administration Commission's making a determination that Monroe County and the City of Marathon have "made satisfactory progress . . . in meeting deadlines established by the [new] Work Program." This determination must be made prior to the repeal going into effect. Presumably, the tasks in the Work Program for which satisfactory progress must be made are those relevant and reasonably related to and which result in nutrient credits. Contrary to Petitioners' assertion, the repeal of the mandatory nutrient credit provision does not automatically become effective on the date prescribed in the proposed amendments. Instead, the repeal is contingent on Monroe County's and the City of Marathon's making "satisfactory progress." The term "satisfactory" is not vague as asserted by Petitioners. In the context of Proposed Rules 28-20.110 and 28-18.210, "satisfactory" would be given its common and ordinary meaning, which is "sufficient to meet a demand or requirement."7 Annual Reporting Requirement The existing Comprehensive Plans for Monroe County and the City of Marathon provide that "beginning September 30, 2003, and each year thereafter, [the respective local government] Monroe County and the [DCA] shall report to the Administration Commission documenting the degree to which the Work Program objectives have been achieved." Proposed Rules 28-20.110 and 28-18.210, will modify the annual reporting requirements in the Monroe County and Marathon Comprehensive Plans. The proposed amended provision, which is underlined, and the existing provision are as follows: Beginning September 30, 2003, and each year of the work program thereafter, Monroe County and the Department of Community Affairs shall report to the Administration Commission documenting the degree to which the work program objectives for that year have been achieved. The report for years seven and eight shall be combined and provided to the Administration Commission by September 30, 2005. The Commission shall consider the findings and recommendations provided in those reports and shall determine whether substantial progress has been achieved toward accomplishing the tasks of the work program. Petitioners contend that the proposed rules, which delete the requirement for Monroe County and for the City of Marathon to submit the September 2004 progress report to the Administration Commission, are arbitrary and capricious. Petitioners assert that by deleting the requirement for the 2004 annual progress report, the proposed rules fail to establish an annual safeguard that is required to ensure that the environmental conditions and infrastructure limitation that the annual Work Program is designed to resolve, do not worsen. The proposed rules delete the requirement that Monroe County and Marathon submit their respective reports in September 2004 and delay submission of that report by a year. The time spent negotiating the Partnership Agreement and the proposed changes to the Monroe County Comprehensive Plans and the Land Development Regulations left little time for Monroe County and the City of Marathon to implement the new Work Programs. Moreover, the DCA and the Administration Commission would have had too short a time period in which to judge whether Monroe County and Marathon had made substantial progress. By combining the reports for Years Seven and Eight of the Work Program, the Administration Commission can expect a meaningful report on Monroe County's and the City of Marathon's progress in implementing their respective Work Programs. Monroe County Work Program Under Proposed Rules Proposed Rule 28-20.110 amends the Work Program Policy 101.2.13 of the Monroe County Comprehensive Plan by adding Years Eight, Nine, and Ten to the existing Work Program. Many of the tasks included therein address and are related to wastewater facilities, habitat protection, affordable housing, and hurricane evacuation and implement the Partnership Agreement. Year Eight of the Work Program requires that Monroe County and other designated agencies perform the specified tasks and provide, in relevant part, the following: Year Eight (July 13, 2004 through July 12, 2005) Review and revise (as necessary) the Conservation and Natural Areas Map. Initiate acquisition strategy for lands identified outside the Conservation and Natural Areas identified as worthy of protection. Begin public hearings for Conservation and Natural Areas boundaries. Conclude public hearings for the adoption of the amended Conservation and Natural Areas Boundaries. Adopt an ordinance to implement a moratorium on ROGO/NROGO applications that involves the clearing of any portion of an upland tropical hardwood hammock or pinelands habitat contained in a tropical hardwood hammock or pinelands patch of two or more acres in size located within a Conservation and Natural Area. Adopt amendments to the comprehensive plan and land development regulations to enact overlay designations, and eliminate or revise the Habitat Evaluation Index, and modify the ROGO/NROGO system to guide development away from environmentally sensitive lands. Amend land development regulations to prohibit the designation of Conservation and Natural Areas (Tier 1) as a receiver site for ROGO exempt development from sender sites; and to further limit clearing of upland native habitat that may occur in the Natural Areas (Tier I) and the Transition and Sprawl Reduction Area (Tier II) upon designation by the County. Develop Land Acquisition and Management Master Plan and address both funding and management strategies. Provide $40 million in financing secured by infrastructure tax for wastewater facilities. Begin construction of wastewater plants or laying of collection lines for Baypoint, Conch Key and Key Largo Trailer Village/Key Largo Park. Ensure the connection for up to 1,350 EDUs [equivalent development units] at Stock Island to Key West Resort Utilities. Complete the Lower Keys and Key Largo feasibility study. Complete projects identified in the Storm Water Management Master Plan. Evaluate and implement strategies to ensure that affordable housing remains affordable in perpetuity for future generations. Establish a partnership with non-profit organizations in order to construct affordable housing using additional state funds. Identify potential acquisition sites for affordable housing proposals and include in the Land Acquisition Master Plan. Provide up to $10 million in bond financing from the Tourist Impact Tax for acquisition of land for workforce housing and affordable housing sites. Complete a comprehensive analysis of hurricane evacuation issues in the Florida Keys and develop strategies to reduce actual hurricane clearance times and, thereby, reduce potential loss of life from hurricanes. As discussed below, several of the tasks in Year Eight of the Work Program implement parts of Goal 105 of the Monroe County Comprehensive Plan. Goal 105 reads: Monroe County shall undertake a comprehensive land acquisition program and smart growth initiatives in conjunction with its Livable CommuniKeys Program in a manner that recognizes the finite capacity for new development in the Florida Keys by providing economic and housing opportunities for residents without compromising the biodiversity of the natural environment and the continued ability of the natural and man-made systems to sustain livable communities in the Florida Keys for future generations. Goal 105, also referred to as the "Smart Growth Goal," provides a framework to implement the FKCCS and a 20-year land acquisition program. The initial phase of implementing Goal 105 calls for the drafting and adoption of "Tier Maps" to be used as guidance for the Monroe County's Land Acquisition Program. Pursuant to Policy 105.2.1 of the Monroe County Comprehensive Plan, the Tier maps will designate and map properties into one of the following three general categories for purposes of Monroe County's Land Acquisition Program and the smart growth initiatives: Natural Area (Tier I); Transition and Sprawl Reduction Area (Tier II); and Infill Area (Tier III). Tier I property is property where all or a significant portion of the land is characterized as environmentally sensitive by policies of the Monroe County Comprehensive Plan and applicable habitat conservation plan. Tier I is to be designated as a Natural Area. New development is to be severely restricted in Tier I. Tier II is any geographic property where scattered groups and fragments of environmentally-sensitive lands, as defined by the Comprehensive Plan, may be found and where subdivisions are not predominantly developed. New development is to be discouraged in Tier II, which is to be designated as Transition and Sprawl Area. Tier III is property where a significant portion of land is not characterized as environmentally sensitive, as defined by the Monroe County Comprehensive Plan, where existing platted subdivisions are substantially developed, served by complete infrastructure facilities, within close proximity to established commercial areas or where a concentration of non-residential uses exist. New development and re-development are to be highly encouraged in Tier III, which is to be designated as Infill Area. Petitioners contend that Task A, which requires Monroe County to "review and revise [as necessary] the Conservation and Natural Areas ["CNA"] Map, vests unbridled discretion to the County to amend the CNA map without adequate standards or criteria." Further, Petitioners assert that Task A does not identify the purpose for which the CNA map is to be used. Based on this assertion, Petitioners contend that Task A is arbitrary and capricious and contravenes law. Task A will assist in the implementation of the Comprehensive Plan by requiring Monroe County to review and revise the CNA map. In reviewing Task A, it is clear that the county must adhere to the criteria prescribed in Goal 105 of the existing Monroe County Comprehensive Plan. When Task A is read together with Goal 105 and its related policies, it is clear that the purpose of Task A is to provide guidance for the Monroe County Land Acquisition Program. As a part of the review and revision process, the Partnership Agreement, which Task A implements, provides that the Monroe County staff should prepare the CNA map utilizing Florida Marine Source Resources Institute ADID maps, the most recent aerial photographs, site visits as necessary, and obtain input from DCA and the public. Moreover, when Task A is read with Task B, and other relevant parts of the Monroe County Comprehensive Plan, it is clear that a CNA map is to be used to implement Goal 105 of the Monroe County Comprehensive Plan, which is related to land acquisition and "smart growth initiatives." Petitioners assert that Task B, which requires Monroe County to "initiate acquisition strategy for lands identified outside the [CNA] boundaries," is arbitrary and capricious and contravenes the law implemented, because it provides no standards or criteria. Task B is consistent with Policy 105.2.1 of Goal 105 of the Monroe County Comprehensive Plan. The Partnership Agreement consistent with Goal 105 provides that Monroe County will identify lands outside the CNA boundaries for acquisition and target for purchase appropriate environmentally-sensitive lands that are contained within upland habitat of two acres or more outside the CNA. Task C requires Monroe County to "begin public hearings for [CNA]." Task D requires Monroe County to conclude the public hearings for adoption of the amended [CNA] boundaries. Petitioners contend that Tasks C and D are arbitrary and capricious and contravene the law implemented, because they do not require that an end result be achieved as a result of these public meetings. When the provisions of Task C and Task D are read together, with Goal 105 and the relevant provisions of the Partnership Agreement, it is clear that the end result sought as a result of the public hearings is to receive public comment regarding the identification of lands to be included in the CNA. Furthermore, this is a reasonable meaning of Tasks C and D in light of the well-known purpose of public hearings. Petitioners challenge Task E, which requires Monroe County to "adopt an ordinance to implement a moratorium on ROGO/NROGO applications that involves the clearing of any portion of an upland tropical hardwood hammock or pinelands habitat contained in a tropical hardwood hammock or pinelands patch of two or more acres in size located within a [CNA]." The purpose of the moratorium is to prevent impacts to native habitat until Monroe County adopts permanent regulations and amendments. Petitioners contend that Task E of Year Eight of the Work Program, which requires Monroe County to "adopt an ordinance to implement a moratorium on ROGO/NROGO applications that involve the clearing of any portion of an upland hardwood hammock or pinelands habitat contained in a tropical hardwood hammock or pinelands patch of two acres or more . . . within a [CNA]," is arbitrary and capricious and contravenes the law implemented. Petitioners assert that the criteria for the interim ordinance required fails to protect all hammock and pineland, does not protect enough hammock to ensure that the carrying capacity of the Florida Keys terrestrial habitat to sustain degradation and loss is not exceeded, does not require that the interim protections last until replaced by permanent ones, and does not apply to ROGO-exempt allocations. The criteria for the interim ordinance required by Task E is reasonable and will result in strengthening habitat protection in the areas specified in that provision. The fact that Task E authorizes the adoption of an ordinance that protects less than "all" hammock and pineland, does not make the proposed rule arbitrary and capricious, nor does the proposed rule contravene the law implemented. Petitioners contend that Task F, which requires Monroe County to "[a]dopt amendments to the comprehensive plan and land development regulations to enact overlay designations, and eliminate or revise the Habitat Evaluation Index ["HEI"], and modify the ROGO/NROGO system to guide development away from environmentally sensitive lands," is arbitrary and capricious and contravenes the law implemented. Petitioners claim that the standard set forth in Task F, "to guide development away from environmentally sensitive lands," is no more specific than is statutory language. Petitioners assert that the proposed rule should specify (1) habitat types, patch sizes and other characteristics of the areas to which regulations will apply, and (2) the exact nature of the regulation (i.e. a prohibition on direct or secondary impacts, the application of negative points or open space rations, etc.) that will be relied upon to guide development away from such areas. Task F requires Monroe County to adopt amendments to the Comprehensive Plan and Land Development Regulations to enact the overlay designations requiring Monroe County to implement Policy 105.2.2 of the Monroe County Comprehensive Plan. Task F will implement Goal 105 of the Monroe County Comprehensive Plan. This task will identify areas to which future development will be directed. Also, the overlay designations will give property owners more certainty with respect to whether they can or cannot develop their property. The requirement in Task F, that the HEI be reviewed or eliminated, is reasonable in light of Goal 105 of the Monroe County Comprehensive Plan. The HEI is currently used by Monroe County to evaluate the environmental sensitivity of land and its suitability for development and acquisition. The HEI requires lot-by-lot evaluations, which fail to take into account secondary impact of development and has resulted in the loss of valuable habitat. The Tier System in Goal 105 is designed to move Monroe County away from the existing HEI. Implementation of Goal 105 requires that the existing HEI be eliminated or revised. Task G of Year Eight of the Work Program requires Monroe County to "amend land development regulations to prohibit the designation of [CNA] (Tier 1) as a receiver site for ROGO exempt development from sender sites; and to further limit clearing of upland native habitat that may occur in the [CNA] (Tier I) and the Transition and Sprawl Reduction Area (Tier II) upon designation by the County." Petitioners contend that Task G is arbitrary and capricious and contravenes the law implemented because it fails to permanently protect even that habitat which Monroe County claims is most important to protect, allows the geographic scope of the contemplated rules to be defined in the future without stated criteria or standards, and allows an unnecessary delay in the adoption of protections which the data and legal requirements demonstrate should have been adopted two years earlier. Task G is intended to strengthen protection of habitat by adopting land development regulations to prohibit development in specified areas and to further limit clearing in designated areas. Goal 105, specifically, provides guidance as to the standards that such regulations must follow in Policy 105.2.1 of the Monroe County Comprehensive Plan. Petitioners contend that Task K of Year Eight of the Work Program requiring Monroe County to ensure the connection for up to 1,350 units at Stock Island to Key West Resort Utilities, is arbitrary and capricious and contravenes the law implemented. Petitioners charge that the requirement in the proposed rule is vague and could be met by simply connecting one home to the referenced wastewater utility to remedy a documented, serious water quality problem. When the purpose of Task K is considered, the reasonable meaning of the provision is that the task requires that Monroe County connect approximately 1,350 units to the designated facility. Petitioners contend that Task M of Year Eight of the Work Program, which requires Monroe County to "complete projects identified in the Stormwater Management Master Plan," is arbitrary and capricious and contravenes the law implemented. In support of this contention, Petitioners assert that the Proposed Rule does not identify the name or number of stormwater projects that are to be completed. Petitioners argue that by referring only to "projects," without specifying the name or number of the projects to be completed, the Proposed Rule may require that only a minimum of two projects be completed. The reasonable interpretation of Task M is that Monroe County is required to complete all the remaining projects identified in the Stormwater Management Master Plan. This meaning is supported by a review of related tasks in the previous years of the Work Program. For example, Year Six of the Work Program required Monroe County and other designated agencies to "initiate construction of selected projects as identified in the Stormwater Management Master Plan." Year Seven of the Work Program required that Monroe County and other agencies "continue implementing selected projects identified in the Stormwater Management Master Plan." Petitioners contend that Task P in Year Eight of the Work Program, which requires Monroe County to "provide up to $10 million in bond financing from the Tourist Impact Tax for acquisition of land for workforce housing and affordable housing sites," is arbitrary and capricious and contravenes the law implemented. As a basis for this contention, Petitioners claim that Task P sets a vague requirement which could be met by simply providing $1.00 in bond financing to provide a need which the State and Monroe County claim is important enough to justify the permitting increase allowed by Proposed Rules 28-18.210 and 28-20.110. Contrary to Petitioners' assertions, the requirement to provide $10 million in bond financing could not be met by providing $1.00 in bond financing. The $10 million figure represents the approximate amount of bond financing that will be provided. For the reasons stated above, it is not possible to include an exact amount in this Work Program requirement. The Work Program for Year Nine provides that the following tasks be done between July 13, 2005, through July 12, 2006: In coordination with the Florida Key Aquaduct Authority and Key Largo Sewer District, initiate the process to obtain $80 million in bond financing secured by connection fees. Secure site for lower Keys and Key Largo wastewater facilities. Petitioners contend that Task A for Year Nine for the Work Program, which requires that Monroe County, "in coordination with the Florida Keys Aqueduct Authority and the Key Largo Sewer District, initiate the process to obtain $80 million in bond financing secured by connection fees," is arbitrary and capricious and contravenes the law implemented. Petitioners contend that Task A, which requires that Monroe County only "initiate" the process necessary to obtain the required bond financing, and does not require that the funds be secured and dedicated to actual improvements, delays funding to remedy a critical water quality problem. The reasonable meaning of the provision in Task A, that Monroe County will initiate the process to obtain "80 million in bond financing secured by connection fees," is that Monroe County will take all steps legally necessary to accomplish obtaining the bond financing. Petitioners contend that Task B of Year Nine of the Work Program, which requires Monroe County to "secure a site for lower Keys and Key Largo wastewater facilities," is arbitrary and capricious and contravenes the law implemented, because it delays an important remedy to a critical water quality problem. Task B reasonably requires that one of the first steps that must be taken prior to constructing any wastewater facility is to secure a site. Irrespective of the need for the wastewater facilities specified in Task B, unless a site is secured, no construction can occur. Proposed Rule 28-20.110(1), which amends Policy of the Monroe County Comprehensive Plan by adding Year Ten to the Work Program, provides the following: Year Ten (July 13, 2006 through July 12, 2007) Award Contract for design, construction, and operation of lower Keys and Key Largo wastewater facilities. Begin construction of the lower Keys and Key Largo wastewater plants. Initiate connections to lower keys and Key Largo wastewater systems. Complete construction and hookups for Bay Point, Conch Key and Key Largo Trailer Village/Key Largo Park. Obtain $80M in bond financing secured by connection fees Petitioners contend that Task A, which requires Monroe County to award a contract for design, construction, and operation of the lower Florida Keys and Key Largo wastewater facilities, is arbitrary and capricious and contravenes the law implemented, because it delays an important remedy to a critical water quality problem. Petitioners also contend that Task D, which requires that construction and hookups for specified areas be completed, and Task E, which requires Monroe County to obtain $80 million in bond financing secured by connection fees, are arbitrary and capricious and contravene the law implemented. That Tasks A, D, and E are required to be completed in Year Ten of the Work Program, between July 13, 2006, and July 12, 2007, is reasonable in view of the steps that must be taken prior to completing the responsibilities provided in those tasks. Petitioners contend that Task B, which requires Monroe County to "begin construction of the lower Florida Keys and Key Largo Trailer Village/Key Largo Park wastewater plants" between July 13, 2006, and July 12, 2007, is arbitrary and capricious and contravenes the law implemented. Petitioners assert that this portion of Proposed Rule 28-20.110 delays an important remedy to a critical water quality problem and does not require the completion of construction or the hookup and operation of the necessary facility. Task B of the Work Program, to begin construction of the lower Florida Keys and Key Largo wastewater plants, reasonably and logically follows the task in the preceding work year that required Monroe County to secure a site for the lower Florida Keys and Key Largo wastewater facilities. Given this chronology, it is reasonable that Task B does not require that the specified wastewater facilities be completed and fully operational the same year that construction begins. Petitioners contend that Task C of Year Ten of the Work Program, which requires Monroe County and Largo Sewer District to "initiate connections to lower Keys and Key Largo wastewater systems," is arbitrary and capricious and contravenes the law implemented. As a basis for this contention, Petitioners assert that Task C does not require the completion of connections and operation of the system, but requires only the undefined "initiation" of connections. Task C, which requires Monroe County to "initiate connections" to the lower Florida Keys and Key Largo wastewater facilities, is not arbitrary and capricious. Given the purpose of this task, this provision reasonably requires Monroe County to begin connecting units to the wastewater facilities. Even without a precise number, the reviewing agencies can evaluate the Work Program for Year Ten, including Task C, and determine if Monroe County has made substantial progress. City of Marathon Work Program Under Proposed Rules Proposed Rule 28-18.210 adds Year Eight and Year Nine to the existing Work Program in Policy 101.2.14 of the Marathon Comprehensive Plan. The tasks in the Work Program, many of which implement the Partnership Agreement, include tasks related to the construction of wastewater facilities, affordable housing, and hurricane evacuation. Year Eight of the Work Program of the Marathon Comprehensive Plan include, in relevant, part the following tasks: Year Eight (July 12, 2004 through July 12, 2005) Begin construction of wastewater collection lines for Little Venice Phase II by December 2004. Work with the Florida Keys Aqueduct Authority to initiate bond financing for citywide sewer facilities and to develop a schedule of events necessary to initiate process by December 2004. Develop and advertise a Request for Proposal for the design, construction, operation of Marathon Central Wastewater System by December 2004. Obtain necessary bond financing (60% of projected sewer cost) secured by connection fees by December 2004. Award contract for design, construction and operation of Marathon Central Wastewater System by December 2004. By January 2005, identify potential acquisition sites for affordable work force housing. Establish a partnership with non- profit organizations in order to construct affordable housing using additional state funds. Evaluate strategies to increase the time that affordable housing remains affordable; establish a maximum sales price for work force housing and establish a ceiling on down payments that are not subsidized by public programs; and amend comprehensive plan and/or land development regulations. * * * Develop a map or list of real estate numbers of lots containing environmentally sensitive lands in need of acquisition and submit to the Department of Community Affairs by July 2004. Assist the state in land acquisition efforts by establishing a land acquisition advisory committee to prioritize proposed acquisitions by July 2004. Complete a comprehensive analysis of hurricane evacuation issues in the Florida Keys and develop strategies to reduce actual hurricane clearance times and thereby reduce potential loss of life from hurricanes. Year Nine of the Work Program of the Marathon Comprehensive Plan includes in relevant part the following tasks: Year Nine (July 13, 2005 through July 12, 2006) Begin construction of Phase I of Marathon Central Wastewater System by January 2006. Evaluate wastewater master plan and indicate areas, if any, that will not receive central sewer. For any area that will not be served by central sewer, develop a septic tank inspection program and begin implementation of the program by September 2005. * * * E. Develop and implement a Building Permit Allocation System that discourages and limits development in environmentally sensitive areas within the proposed Marathon comprehensive plan by July 2005. Petitioners contend that Proposed Rule 28-18.210(1), which establishes the Work Program for Years Eight and Nine, is arbitrary and capricious and contravenes the law implemented, because it fails to adopt regulation and plan changes, or requires same, to protect terrestrial habitat to the extent shown necessary in the Carrying Capacity Study. The mere fact that the proposed Work Plan for Years Eight and Nine of the Marathon Comprehensive Plan does not address habitat protection, does not make those provisions arbitrary or capricious. Neither does it mean that they contravene law. In this case, it reflects that the Work Plan emphasizes other issues relevant to the City of Marathon Comprehensive Plan. Siting Utilities and Public Facilities The siting of public facilities in Monroe County is governed by existing Policy 101.12.4 in the Monroe County Comprehensive Plan. According to that policy, Monroe County requires that an "analyses be undertaken prior to finalizing plans for the siting of any new or significant expansion (greater than 25 percent) of any existing public facility," and that the analyses include "an assessment of needs, evaluation of alternative sites and design alternatives for the selected sites and assessment of direct and secondary impacts on surrounding land uses and natural resources." With regard to the assessment impacts on surrounding land uses and natural resources, existing Policy 101.12.4 provides the following: The assessment of impacts on surrounding land uses and natural resources will evaluate the extent to which the proposed public facility involves public expenditures in the coastal high hazard area and within environmentally sensitive areas, including disturbed salt marsh and buttonwood wetlands, undisturbed beach berm areas, units of the coastal barrier resources system, undisturbed uplands (particularly high quality hammock and pinelands), habitats of species considered to be threatened or endangered by the state and/or federal governments, consistent with 105.2.1 offshore islands, and Conservation Land Protection Areas. Proposed Rule 28-20.110(2) amends existing Policy 101.12.4, which deletes the term "Conservation Land Protection Areas" from the category of areas included as environmentally sensitive areas, as quoted above, and replaces it with the term, "Natural Areas (Tier I)." Proposed Rule 28-20.110(2) also adds the following provision to existing Policy 101.12.4. Except for passive recreational facilities on publicly owned land, no new public community or utility facility other than water distribution and sewer collection lines or lift stations, and the existing Key Largo Wastewater Treatment Facility, shall be allowed within the Natural Areas (Tier I) unless it can be accomplished without clearing of hammock or pinelands. Exceptions to this requirement may be made to protect the public health, safety and welfare, if all the following criteria are met: No reasonable alternatives exist to the proposed location; and The proposed location is approved by a super-majority of the Board of County Commissioners. Petitioners contend that Proposed Rule 28-20.110(2), discussed above, is arbitrary and capricious and contravenes the law implemented. Petitioners assert that the Proposed Rule allows the siting of public facilities in terrestrial habitats (CNA or Tier I) and also allows water distribution and sewer collection lines or lift stations to be built as a matter of right in a CNA or Tier I, contrary to the findings of the Carrying Capacity Study. Petitioners also contend that the provision in the Proposed Rule, discussed above, is vague, because it refers to the term "natural areas," but is intended to mean CNAs. In the recent past, a decision to site a sewage treatment facility in an environmentally sensitive hammock elicited considerable controversy. Ultimately, Monroe County and the DCA agreed that public facilities should not be located on environmentally sensitive land. The proposed change to Policy 101.12.4 strengthens the policy by requiring approval of a super majority of the Monroe County Board of County Commissioners (County Commission) for an exemption. This also adds specificity to the policy and provides more protection for natural areas and, thus, improves protection of environmentally- sensitive habitat. Contrary to Petitioners' assertion, the term "natural area" is not vague. The Monroe County Comprehensive Plan currently includes Goal 105, which describes a detailed land classification system. "Natural Area (Tier I)" represents natural areas that can be targeted for acquisition and is an updated term. On the other hand, the term "Conservation Land Protection Areas" refers to lands targeted for acquisition by federal and state agencies. ROGO Exemption for Public Facilities Both Monroe County and Marathon have a "Rate of Growth Ordinance," also known as ROGO. A site proposed for development is ranked based on the environmental sensitivity of the property and receives negative points for greater environmental sensitivity. A site proposed for development can also receive positive points for such things as providing its own water system or elevation above the minimum flood insurance elevation. Monroe County and the City of Marathon award their annual allocation of development permits to the top-scoring sites. Proposed Rule 28-20.110 will make several modifications to the ROGO point allocation system in the Monroe County Comprehensive Plan. Existing Policy 101.3.4 of the Monroe County Comprehensive Plan provides that "public facilities shall be exempted from the requirements of the Permit Allocation System for new non-residential development." The existing policy also provides that certain development activity by enumerated federally tax-exempt, not-for-profit organizations "may be exempted from the Permit Allocation System by the County Commission after review by the Planning Commission upon a finding that such activity will predominantly serve the County's non- transient population." Proposed Rule 28-20.110(3) amends existing Policy 101.3.4 by requiring that the County Commission make an additional finding as a condition of exempting certain development activity by certain federally tax-exempt not-for- profit organizations from the Permit Allocation System. Pursuant to the proposed rule, the County Commission must also find that the "development activity is not planned within an area proposed for acquisition by governmental agencies for the purpose of resource protection." Petitioners contend that the provision of Proposed Rule 28-20.110(3), discussed above, is arbitrary and capricious and contravenes the law implemented in that the development activities of the federally tax-exempt, not-for-profit organizations covered by the proposed rule allows development activity on some environmentally-sensitive areas and is inconsistent with the Carrying Capacity Study. Existing Policy 101.3.4 allows development activity by not-for-profit organizations without a permit allocation because such development does not include overnight accommodations which might impact hurricane evacuation. Since a permit allocation was not necessary, such development was not affected by the negative points awarded for development in an area proposed for acquisition for resource protection. However, some not-for- profit organizations proposed development in environmentally- sensitive areas. The proposed change will prevent ROGO-exempt development on such lands and improve the protection of environmentally-sensitive habitat. Lot Aggregation Existing Policy 101.5.4, of the Monroe County Comprehensive Plan addresses the issue of lot aggregation and provides that "points shall be assigned to Allocation Applications for proposed dwelling units, which include a voluntary reduction of density permitted as of right within subdivisions (residential units per legally platted, buildable lots) by aggregating vacant, legally platted, buildable lots." This policy sought to reduce density within subdivisions by awarding or assigning positive points to applicants who aggregated two or more contiguous, vacant, legally buildable lots. The existing policy motivated and allowed applicants to purchase any contiguous property in order to be awarded additional points and, thus, increased their chances of receiving an allocation, even if the lots were in areas targeted for public acquisition for resource protection. Proposed Rule 28-20.110(4) amends Policy 101.5.4, Subsection 3, by prohibiting the awarding of points to Allocation Applications "for lot aggregation within those areas proposed for acquisition by public agencies for the purpose of resource protection." Petitioners assert that the proposed rule is arbitrary and capricious and contravenes the law implemented because it fails to adequately protect terrestrial habitat to the extent shown necessary in the Carrying Capacity Study. The basis of Petitioners' assertion is that under Proposed Rule 28-20.110(4), an applicant can get positive points for aggregating habitat, if the area is not proposed for acquisition by public agencies for the purpose of resource protection. Proposed Rule 28-20.110(4) will direct applicants seeking to be awarded additional points for "lot aggregation away from areas proposed for acquisition by public agencies for resource protection and, thereby, improve protection of terrestrial habitat. Clearing of Native Vegetation Existing Policy 205.2.7 of the Monroe County Comprehensive Plan provides that the "clearing of native vegetation shall be limited to the immediate development area." Under the existing policy, an applicant with aggregated lots would demand to clear a portion of both lots, so that a large portion of all of the lots would be cleared. Proposed Rule 28-20.110 amends existing Policy 205.27.7 by adding the following provision relating to the clearing of vegetation areas where Allocation Applications have received points for lot aggregation: For applications that receive points for lot aggregation under the Permit Allocation System for residential development, clearing of vegetation shall be limited to the open space ratios in Policy 205.2.6 or 5,000 square feet, whichever is less. The clearing of vegetation for ROGO applications that receive points for lot aggregation is also addressed in Proposed Rules 28-20.120(4), which adds a new provision, Regulation 9.5-347(e), to the Monroe County Land Development Regulations. That new provision is as follows: Section 9.5-347 (e) Lot Aggregation and Clearing: For ROGO applications that receive points for lot aggregation under Section 9.5-122.3 (a)(3), clearing of vegetation shall be limited to the open space ratios in paragraph (b) above or five-thousand (5,000) square feet, whichever is less. Petitioners contend that Proposed Rules 28-20.110(b) and 28-20.120(4) are arbitrary and capricious and contravene the law implemented, because they do not prohibit clearing of aggregated lots and are inconsistent with the Principles Guiding Development and with the Carrying Capacity Study. Notwithstanding Petitioners' assertions, even though the proposed rules do not prohibit all clearing of native vegetation, they will limit the amount of clearing for applicants who receive a ROGO allocation based upon lot aggregation. Under Proposed Rule 28-20.120(4), the clearing will be limited to an amount necessary to construct a reasonably-sized house. Technical Coordination Letter Proposed Rule 28-20.110(5), which will add a new policy, Policy 101.5.11, to the Monroe County Comprehensive Plan, provides the following: If not listed in the document "Parcels Not Located in Threatened and Endangered Species Habitat and Not Subject to FWS Consultation", or involving minor development activity exempted by the U.S. Fish and Wildlife Service (USFWS)", any application for a ROGO or NROGO allocation shall contain a technical coordination letter from the USFWS. The County shall consider the recommendations of the USFWS's technical coordination letter in the issuance of the subject permit, except that if a low-effect habitat conservation plan is required by USFWS, the mitigation requirements of that plan shall be incorporated in the conditions of the permit. As a result of federal litigation, the U.S. Fish and Wildlife Service ("USFWS") created a list of "Parcels Not Located in Threatened and Endangered Species Habitat and Not Subject to FWS Consultation." Monroe County and the DCA have developed the practice of requiring a technical coordination letter from the USFWS for development on parcels that are not on that list or are not otherwise exempt from USFWS review. Proposed Rule 28-20.110(5) incorporates into the Monroe County Comprehensive Plan a current practice that resulted from federal litigation. Monroe County Land Development Regulation 9.5-120 Proposed Rule 28-20.120(1) adds the phrase "species of special concern" to the following terms defined in Section 9.5-120(b) of the Monroe County Land Development Regulation as shown by the underlining: (1) "Known habitat of threatened/endangered animal species or species of special concern"; (2) "Potential habitat of threatened/endangered animal species" or species of special concern; and (3) Wide-ranging threatened/endangered animal species or species of special concern. This proposed change will conform the land development regulations to the Monroe County Comprehensive Plan by expanding the list of species that result in negative points under the Permit Allocation System to include "species of special concern." Existing Regulation 9.5-120(b) includes in the definitions of "known habitat of threatened/endangered animal species" and "potential habitat of threatened/endangered species" the sentence, "The county's threatened and endangered species maps shall constitute prima facie evidence of the species unless determined otherwise by the director of environmental resources." The definition of "wide-ranging threatened/endangered animal species" includes the sentence, "The county's threatened and endangered species maps shall constitute prima facie evidence of wide-ranging threatened or endangered species unless determined otherwise by the director of environmental resources."8 Proposed Rule 28-20.120(1) amends Section 9.5-120(b) by deleting the phrase, "unless determined otherwise by the director of environmental resources" from the sentences quoted above. Proposed Rule 28-20.120(1)(a) adds the following provision to the section of Regulation 9.5-120, which defines the term "known habitat of threatened/endangered species or species of special concern": (1) . . . The county's threatened and endangered species maps shall constitute prima facie evidence of the species. Within areas designated for public acquisition for the purposes of resource protection, any threatened, endangered or species of special concern species observed on site while conducting a habitat evaluation shall be noted on the adopted Threatened and Endangered Species Maps. Such observations noted while conducting a habitat evaluation by County Staff Biologists, consultants certified by the County, conducting habitat evaluations, or state or federal agency representatives conducting field inspections shall also constitute evidence of species. Petitioners contend that the portion of Proposed Rule 28-20.120(1)(a), quoted above, is arbitrary and capricious. Petitioners assert that the Proposed Rule fails to account for potential observations of "known habitat of threatened/endangered animal species" on parcels that are not within "areas designated for public acquisition for purposes of resource protection." Also, Petitioners assert that the Proposed Rule limits observations of species required to be noted on the adopted threatened and endangered species maps to consultants or scientists on the parcel specifically to conduct an HEI analysis and fails to require field verification of the parcel. Proposed Rule 28.20.120(1)(a) will expand the circumstances in which observations of listed species will cause modification of the adopted threatened and endangered species maps. Under the present land development regulations, Monroe County modified the maps only if a county staff biologist observed a listed species and did not take into account other professional observations. Monroe County Land Development Regulation 9.5-122.3 Regulation 9.5-122.3(a)(8) of the Monroe County Land Development Regulations establishes and assigns evaluation criteria and point assignment for applications for proposed dwelling units in Monroe County. The existing regulation requires that negative points be assigned to applications that propose a dwelling unit within a "known habitat of a documented threatened/endangered species" and a "potential habitat of threatened/endangered species." Proposed Rule 28-20.120(2) adds the following language to Section 9.5-122.3.(a)(8),9 as shown by the underlined provisions: Point Assignment: Criteria: -10 An application which proposes a dwelling unit within a known habitat of a threatened/endangered species or a species of special concern. For species of special concern, negative points shall only be applied to areas designated for public acquisition for the purpose of resource protection. -5 An application which proposes a dwelling unit within a potential habitat of a threatened/endangered species or a species of special concern. For species of special concern, negative points shall only be applied to areas designated for public acquisition purposes of resource protection. Regulation 9.5-1223.(a)(8), as amended, adds "species of special concern" to the species covered by the existing regulation. Also, the amended regulation requires that negative points be assigned to applications that propose dwelling units in a habitat of a species of special concern, if the area is designated for public acquisition for purposes of resource protection. Petitioners contend that Proposed Rule 28-20.120(2), which amends Regulation 9.5-122.3(a)(8), is arbitrary and capricious. As a basis for this contention, Petitioners assert that even though the Proposed Rule increases situations where an application is awarded negative points, it decreases protection of habitat by limiting the negative point award only to habitat of special concern that have been designated for public acquisition. Proposed Rule 28-20.120(2) increases situations in which an application will be awarded negative points by adding "species of special concern" to the species covered by Regulation 9.5-122.3(a)(8). By awarding negative points as provided in the proposed rule, there is increased protection of habitat for species of special concern. Monroe County Land Development Regulation 9.5-336 Proposed Rule 28-20.120(3) amends Section 9.5-336(b) of the Monroe County Land Development Regulations as follows: (b) Review and Amendment: The existing conditions map may be refined to reflect conditions legally in existence on February 28, 1986. Such refinements shall be made pursuant to the procedures for typographical and drafting errors in section 9.5-511(e). The existing conditions map as referenced throughout this chapter is intended only to serve as a general guide to habitat types for the purpose of preliminary determination of regulatory requirements. The county biologist shall make the final determination of habitat type based upon field verification, except that existing conditions that reflect disturbed with hammock shall be classified as a low quality hammock. Unlawful conditions shall not be recognized when determining regulatory requirements. Petitioners contend that Proposed Rule 28-20.120(3) is arbitrary and capricious and contravenes the law implemented because it does not protect all habitat. The existing conditions map was prepared in the 1980s. Many of the sites designated on the map as "disturbed with hammock" have re-vegetated since then. The proposed change will protect those sites by requiring clustering away from the hammock and by controlling the amount of allowed clearing. Hurricane Evacuation Monroe County and Marathon face a unique hurricane evacuation challenge. There is only one road out of the Florida Keys, and everyone must use that road to evacuate. For a Category 3 or greater hurricane, all areas of the Florida Keys must be evacuated because of the low elevations, the vulnerability to storm surge, and the logistics of post-disaster recovery. The Monroe County Comprehensive Plan and the Marathon Comprehensive Plan currently state that each ". . . shall reduce hurricane evacuation clearance times to 24 hours by the year 2010." The 24-hour standard was adopted by the Administration Commission at the conclusion of prior litigation over the Monroe County Comprehensive Plan. The term "hurricane evacuation clearance time" refers to the time that the emergency managers must call the evacuation before the arrival of tropical storm force winds. Hurricane evacuation clearance time includes both the time for citizens to mobilize (i.e., get their affairs in order, shelter their houses, take care of their belongings), and the time to evacuate the vehicles from the roadway. Tropical storm force winds typically arrive eight to 12 hours before the eye of the storm. In order to achieve a 24-hour hurricane evacuation clearance time, emergency managers must call the evacuation 32 to 36 hours before the arrival of the eye. The DCA contracted with Miller Consulting, Inc., to create a computer model to estimate the actual hurricane evacuation clearance time for the Florida Keys. The Miller model provides the best available data and analysis for estimating the clearance time. The latest run of the Miller model performed by the DCA using 2000 Census data, supplemented with development permit data up to August 2004, provides the best estimate of clearance time. This run of the Miller model estimates a hurricane evacuation time of 23 hours and 56 minutes to reach the beginning of the Homestead Extension of the Florida Turnpike on the mainland, and 24 hours and 48 minutes to reach the hurricane shelter at Florida International University ("FIU"). The beginning of the Florida Turnpike in Florida City is the appropriate endpoint for hurricane evacuation clearance time estimates. Florida City is a point of relative safety outside of the Category 3 vulnerability zone. Florida City is also the point of dispersal for the Florida Keys, where evacuees disperse to any number of destinations, such as South Dade, the FIU shelter, or a hotel in Orlando. The Miller model estimates that if those permit allocations are restored and the annual allocation is increased as described above, the hurricane evacuation clearance time next year will be 24 hours and four minutes. This exceeds the 24-hour standard adopted by the Administration Commission. Proposed Rule 28-20.110 adds the following requirement to Year Eight of the Work Program in Policy 101.2.13 of the Monroe County Comprehensive Plan and Policy 101.2.12 of the Marathon Comprehensive Plan: "Complete a comprehensive analysis of hurricane evacuation issues in the Florida Keys and develop strategies to reduce actual hurricane clearance times and thereby reduce potential loss of life from hurricanes." The Florida Keys' local governments have begun the comprehensive analysis of hurricane evacuation issues by convening a workgroup comprised of local government-elected officials and staffed by the DCA. The hurricane workgroup is considering alternative strategies to reduce clearance times, such as constructing an additional outbound lane, using transportation system management to create a temporary outbound lane, updating the assumptions for the Miller model, reducing transient occupancy, or calling the evacuation earlier. The working group must develop a strategy that balances or accommodates development and also addresses hurricane clearance times. The hurricane workgroup must do much more than simply squeeze a few more minutes out of the Miller model. There are currently 13,000 to 14,000 vacant platted lots in the Florida Keys, which must be allowed to develop or must be purchased by government. On average, 3,000 dwelling units generates about one hour of clearance time. As an example, if 8,000 or so lots were purchased for habitat protection, then two more hours of clearance time will be needed to accommodate the remaining 5,000 or 6,000 lots. The hurricane workgroup must develop a strategy to handle the amount of development permitting that can be expected and a program to acquire the balance of the vacant lots. Affordable and Workforce Housing There is an affordable housing crisis in the Florida Keys. The geography of the Florida Keys hinders the ability of working families in the Florida Keys to find affordable housing. Unlike other expensive areas, such as Boca Raton, working families cannot find affordable housing nearby; the nearest area where housing prices are affordable is the mainland in Dade County. From 1999 to 2003, there were 693 allocations for affordable housing units in the Florida Keys. This amount includes all the allocations for affordable housing units for that time period, even those allocations for which affordable housing units were not constructed. The number of affordable housing allocations issued from 1999 to 2003 and the number being issued under the existing Comprehensive Plans of Monroe County and the City of Marathon, are not sufficient to address the need for affordable housing. The Partnership Agreements recognize and address the affordable housing shortfall by increasing the number of annual affordable housing allocations, restoring residential allocations lost in previous years, and providing funding for the acquisition of land and the construction of workforce housing. As discussed above, Proposed Rule 28-20.110 implements the provisions of the Partnership Agreement by amending the Monroe County Comprehensive Plan as follows: increasing the number of annual affordable housing allocations from 32 to 71; (2) reallocating 140 unused allocations to affordable housing; and (3) requiring that the affordable housing remain affordable in perpetuity. Additionally, as specified in paragraph 60, the Work Program in Proposed Rule 28-20.110 requires Monroe County to complete tasks which will be an improvement of the affordable housing situation in Monroe County. As discussed above, Proposed Rule 28-18.210 implements the Partnership Agreement by amending the City of Marathon Comprehensive Plan as follows: (1) increases the overall number, though not the percentage, of allocations for affordable housing to six; (2) restoring 65 unused allocations for affordable housing; and (3) requiring that the affordable housing remain affordable in perpetuity. Also, as specified in paragraph 101, Proposed Rule 28-18.210 requires the City of Marathon to complete tasks that will result in improving the affordable housing issues in the City of Marathon. Proposed Rules 28-20.110 and 28-18.210 only partially address the affordable housing shortage in the Florida Keys. Nonetheless, the proposed amendments to the Comprehensive Plans of Monroe County and the City of Marathon will improve the current affordable housing shortage by increasing the number of affordable houses and providing the financial resources to make that more likely to occur. The Principles Guiding Development Subsection 380.0552(7), Florida Statutes (2004), provides in relevant part: PRINCIPLES FOR GUIDING DEVELOPMENT.- -State, regional, and local agencies and units of government in the Florida Keys Area shall coordinate their plans and conduct their programs and regulatory activities consistent with the principles for guiding development . . . . For the purposes of reviewing consistency of the adopted plan or any amendments to that plan with the principles for guiding development and any amendments to the principles, the principles shall be construed as a whole and no specific provision shall be construed or applied in isolation from the other provisions. . . . [T]he following shall be the principles with which any plan amendments must be consistent: To strengthen local government capabilities for managing land use and development so that local government is able to achieve these objectives without the continuation of the area of critical state concern designation. To protect shoreline and marine resources, including mangroves, coral reef formations, seagrass beds, wetlands, fish and wildlife, and their habitat. To protect upland resources, tropical biological communities, freshwater wetlands, native tropical vegetation (for example, hardwood hammocks and pinelands), dune ridges and beaches, wildlife, and their habitat. To ensure the maximum well-being of the Florida Keys and its citizens through sound economic development. To limit the adverse impacts of development on the quality of water throughout the Florida Keys. To enhance natural scenic resources, promote the aesthetic benefits of the natural environment, and ensure that development is compatible with the unique historic character of the Florida Keys. To protect the historical heritage of the Florida Keys. To protect the value, efficiency, cost-effectiveness, and amortized life of existing and proposed major public investments, including: The Florida Keys Aqueduct and water supply facilities; Sewage collection and disposal facilities; Solid waste collection and disposal facilities; Key West Naval Air Station and other military facilities; Transportation facilities; Federal parks, wildlife refuges, and marine sanctuaries; State parks, recreation facilities, aquatic preserves, and other publicly owned properties; City electric service and the Florida Keys Electric Co-op; and Other utilities, as appropriate. To limit the adverse impacts of public investments on the environmental resources of the Florida Keys. To make available adequate affordable housing for all sectors of the population of the Florida Keys. To provide adequate alternatives for the protection of public safety and welfare in the event of a natural or manmade disaster and for a post-disaster reconstruction plan. To protect the public health, safety, and welfare of the citizens of the Florida Keys and maintain the Florida Keys as a unique Florida resource. In determining whether the Proposed Rules are consistent with the principles, the principles should be considered as a whole. No specific provision should be construed or applied in isolation from other provisions. Ability to Manage Land Use and Development Principle A, set forth in Subsection 380.0552(7)(a), Florida Statutes, is "to strengthen local government capabilities for managing land use and development so that local government is able to achieve these objectives without the continuation of the area of critical state concern designation." Monroe County and the City of Marathon have evidenced a willingness and commitment to provide the funding required to meet the objectives of the Principles Guiding Development. Both local governments have included in the Proposed Rules tasks which reflect their understanding of the need to provide critical facilities, such as wastewater treatment facilities. While the need for such facilities has previously been acknowledged, the Proposed Rules provide a specific source of revenue to provide the needed facilities. Moreover, with regard to Monroe County, the proposed rules/regulations at issue in this proceeding strengthen the environmental protections measures in the Comprehensive Plans while allowing reasonable development. The proposed rules for Monroe County and the City of Marathon are consistent with Principle A. Environmental Issues Subsections 380.0552(7)(b), (c), and (e), Florida Statutes, are principles which require consideration of the impacts on the environment of the Florida Keys. Principle B is "to protect shoreline and marine resources, including mangroves, coral reef formations, seagrass beds, wetlands, fish and wildlife and their habitat." Principle C is "to protect upland resources, tropical biological communities, freshwater wetlands, native tropical vegetation (for example, hardwood hammocks and pinelands), dune ridges and beaches, wildlife and their habitat." Principle E is "to limit the adverse impacts of development on the water quality of water throughout the Florida Keys." Principle I is "to limit the adverse impacts of public investments on the environmental resources of the Florida Keys." The Proposed Rules of Monroe County and the City of Marathon include amendments to the Work Program which provide significant funding for sewage treatment systems that will enhance the protection of the shoreline and marine resources. The Proposed Rules of Monroe County and the City of Marathon are consistent with Principle B. The Proposed Rules of Monroe County improve protection of terrestrial habitat, limit clearing of native vegetation, and provide safeguards to ensure that parcels in threatened and endangered species habitat are protected. The proposed rules of Monroe County are consistent with Principle C. The portions of the Proposed Rules of the City of Marathon that are the subject of this proceeding do not specifically address Principle C. However, the Proposed Rules of the City of Marathon are not inconsistent with Principle C. Accordingly, the proposed rules of the City of Marathon are consistent with Principle C. The Proposed Rules of Monroe County and the City of Marathon limit the adverse impacts of development on the quality of water throughout the Florida Keys by the funding commitments that will hasten the construction of the sewage treatment facilities. The Proposed Rules of Monroe County and the City of Marathon are consistent with Principle E. The Proposed Rules do not encourage any public investment that would have an adverse impact on environmental resources. To the contrary, the Monroe County and the City of Marathon Proposed Rules provide for public investments in waste water improvements that are accelerated. Also, the Monroe County Proposed Rules prevent the construction of public facilities within a hammock area. The Proposed Rules of Monroe County and the City of Marathon are consistent with Principle I. Economic Development Principle D in Subsection 380.0552(7)(d), Florida Statutes, is "to ensure the maximum well-being of the Florida Keys and its citizens through sound economic development. The basis of the Florida Keys' economy is tourism, which is attracted by a clean and healthy environment. The increased protection of water quality that should be achieved by the hastened construction of sewage treatment facilities and the improved protection of habitat will strengthen the economy of the Florida Keys and provide the basis for a sound economic development. Also, the Proposed Rules balance environmental protection with property rights. The Proposed Rules of Monroe County and the City of Marathon are consistent with Principle D. Historical Character and Heritage Principle F in Subsection 380.0552(7)(f), Florida Statutes, is "to enhance natural and scenic resources, promote the aesthetic benefits of the natural environment and ensure that development is compatible with the unique historic character of the Florida Keys." Principle G in Subsection 380.0552(7)(g), Florida Statutes, is "to protect the historical heritage of the Florida Keys." The Proposed Rules of Monroe County and the City of Marathon will have little or no impact on the historic character and historical heritage of the Florida Keys. Thus, the Proposed Rules do no harm to either the historic character or historical heritage of Monroe County or the City of Marathon. Public Investments Principle H in Subsection 380.0552(7)(h), Florida Statutes, is "to protect the value, efficiency, cost- effectiveness, and amortized life of existing and proposed major life investments," including: The Florida Keys Aqueduct and water supply facilities; Sewage collection and disposal facilities; Solid waste collection and disposal facilities; Key West Naval Air Station and other military facilities; Transportation facilities; Federal parks, wildlife refuges, and marine sanctuaries; State parks, recreation facilities, aquatic preserves, and other publicly owned properties; City electric service and the Florida Keys Electric Co-op; and Other utilities, as appropriate. . . . The Proposed Rules of Monroe County and the City of Marathon do nothing to undermine the value, efficiency, cost- effectiveness or amortized life of existing major investments. Rather, the Proposed Rules will result in funding and timely construction of the major sewage and disposal facilities that are already contemplated by Monroe County and the City of Marathon's existing Comprehensive Plans. Affordable Housing Principle J in Subsection 380.0552(7)(j), Florida Statutes, is "to make available adequate affordable housing for all sectors of the population of the Florida Keys." The Proposed Rules include a one-time allocation of 165 permits for affordable housing in Monroe County and 65 permits for affordable housing in Marathon. The Proposed Rules will require all future affordable housing to remain as affordable in perpetuity, rather for a limited time frame. The Propose Rules are consistent with Principle J. Natural or Man-made Disaster and Post-Disaster Relief Principle K in Subsection 380.0552(7)(k), Florida Statutes, is "to provide adequate alternatives for the protection of public safety and welfare in the event of a natural disaster or man[-]made disaster and for a post[-]disaster reconstruction plan." The Proposed Rules require officials of Monroe County and the City of Marathon to participate with other Florida Keys' local governments in a comprehensive analysis of hurricane evacuation issues. The Proposed Rules are consistent with Principle K. Health, Safety, and Welfare of Citizens and Maintenance of Florida Keys as Unique Resource Principle L in Subsection 380.0552(7)(l), Florida Statutes, is "to protect the health, safety, and welfare of the citizens of the Florida Keys and maintain the Florida Keys as a unique Florida resource." The Proposed Rules of Monroe County include provisions that increase protection of upland habitat and require a moratorium on ROGO/NROGO applications in hammocks and pinelands, revisions to the CNA maps, and amendments to the land development regulations. The Proposed Rules for Monroe County and the City of Marathon will improve the water quality by providing funding for and hastening the construction of sewage treatment facilities. The Proposed Rules of Monroe County and the City of Marathon will provide more permit allocations for affordable housing, require Monroe County to approve bond funding for the construction of affordable housing, and provide that all future affordable housing remain affordable in perpetuity. Also, the Proposed Rules require Monroe County and the City of Marathon to participate in a Florida Keys wide analysis and solution to the hurricane evacuation problem. The Proposed Rules of Monroe County and the City of Marathon further the objective of and are consistent with Principle K. The Proposed Rules of Monroe County and the City of Marathon are consistent with Principle L.
Findings Of Fact The Notice of Hearing was entered into evidence and said notice was amended to reflect that the distance of an existing crossing north of the proposed crossing was 2,208' + north rather than 1,500' + north. The application was also changed to reflect that the proposed roadway was to extend the limits of a right of way to 120' instead of 100'. The change would place the mile post at a slightly different location. Upon examination of the area and taking testimony from the three attorneys involved in this hearing, it is the findings of this Hearing Officer that the change in location and the change in the proposed roadway is not of sufficient consequence that the hearing should have been postponed and re- noticed. Inasmuch as the parties directly involved were present, the owners of the railroad were represented, the owners of the Petitioner corporation were represented, there were representatives from the County and from the Florida Department of Transportation. A re-notice with the minor changes in location and in the width of the right of way would have been sent to the same representatives. The Notice of Hearing met the requirements of notice of public hearing. Petitioner Suntree Development Corporation is proposing to construct a connector road between Wickham Road and U.S. 1 approximately 2,208' south of an existing two-lane signalized (warning bells, lights, and gates) road crossing on Pineda Avenue in south Brevard County, Florida. The proposed road is to be four-laned with 120 foot right of way including a 20 foot medium strip. The road would be an access between U.S. 1 and the Suntree Community, a new community on approximately 2,800 acres of land which is predicted to have approximately 35,000 to 40,000 people after total development which is estimated to be completed within a 15 year period. The road would be a limited access with acceleration and deacceleration lines on U.S. 1 with an estimated total anticipated average daily traffic of from 23,000 to 60,000 trips per day. The proposed crossing involves a Type IV cantilevered signalization with bells, flashing lights and gates to be activated by trains. Cost of signalization and maintenance is to be borne by the Suntree Development Corporation. Petitioner is the primary owner of all the lands involved, but does not own all of the right of way needed to construct the crossing. Building is presently limited to a country club, sewage treatment plants, about a mile of roadway and two single family homes under construction and plans for the construction of some forty homes within the next few months. The proposed crossing was approved by the Brevard County Commission with the understanding that the crossing at Pineda Avenue would not be closed. The Florida East Coast Railway track in this area is a single track with 18 through freight trains a day which travel about 60 m.p.h. at the proposed crossing location. Two local freights move at unscheduled times across the railroad tracks. The tracks in the vicinity of the proposed crossing is nearly straight. The Florida East Coast Railway Company owns the right of way over the tracks and opposes the opening of another crossing in such close proximity to the crossing at Pineda Avenue, at this time. Storage capacity or storage area is the area in which cars can stand while awaiting clearance to proceed. The proposed road will contain 1,800' of storage area with 850' on the Wickham Road side and 950' on the U.S. 1 side. Using the average daily traffic figure when the community is developed, as calculated by Petitioner, U.S. 1 would be blocked in 3.28 minutes. Using the average daily traffic figures when the community is developed, as calculated by the Florida Department of Transportation, U.S. 1 would be blocked in 1.27 minutes. The Florida Department of Transportation recommends that an overpass be constructed rather than the at-grade crossing. The Hearing Officer further finds: The Pineda Avenue crossing can serve the vehicular traffic demand at present; Petitioner's plans for development, if realized, will demand another railroad cross- ing to serve the community; The proposed at-grade crossing is in such close proximity to U.S. 1 that it would be hazardous to vehicular traffic on U.S. 1 and the proposed Suntree entry road when the community is developed.
The Issue The issue in this case is whether the application filed by the Florida Department of Environmental Protection (DEP) for abandonment of a segment of Mission Road, from the Ocala Drive intersection to a point east of Yonview Drive, should be granted; and, if so, what conditions should be placed on the abandonment.
Findings Of Fact Proposed Abandonment and Vicinity The eastern terminus of Mission Road is at Ocala Road. At one time, Mission Road intersected Ocala Road and extended farther east along the alignment of Tennessee Street. However, when Tennessee Street was extended farther west, the intersection of Tennessee Street and Ocala Road was moved slightly south of the juncture of Ocala Road and Mission Road. Now at the junction of those roads, Mission Road is designed to have only a right turn in from Ocala Road southbound, and a right turn out from Mission Road onto Ocala Road, headed south. Mission San Luis (Mission) is bisected by Mission Road near its eastern terminus at Ocala Road. While the Mission is accessible from Mission Road, its main entrance is on Tennessee Street just west of Ocala Road. The Mission has administrative offices and an archeological laboratory on the south side of Mission Road, while the re-created Mission and Apalachee Village, along with most of the archeological remains, and visitor parking, are on the north side of Mission Road. Yonview Drive joins Mission Road from the south. The juncture of those two roads marks the western terminus of the part of Mission Road that is the subject of the application for abandonment; Ocala Road marks the eastern terminus of the proposed abandonment. All of the land on either side of this part of Mission Road is owned by the State and is part of the Mission. Proceeding west from Yonview, the Mission is on the northeast side of Mission Road, which provides access to the current parking lot for the Mission and the current visitor center, which is an adaptive use of a house built in 1938. Along that stretch of Mission Road, The Timbers condominium development is on the southwest side of Mission Road. Just west of the Mission property, San Luis Road intersects Mission Road. To the north of Mission Road, San Luis is a public road that proceeds north, past Leon County's San Luis Park (which is on the east side of the road), and residential neighborhoods to the west side, to where San Luis Road intersects Tharpe Street. To the south of Mission Road, aligned with San Luis Road, is an entrance to The Timbers. Sometimes referred to as an extension of San Luis Road, the roadway within The Timbers actually is private and serves as access to The Timbers condominium units; it continues through The Timbers and continues between other properties to the development's other entrance on White Drive. As Mission Road proceeds west from San Luis Road, the rest of The Timbers is on its south side; on its north side, Solana Drive joins it from the residential neighborhood to the north. Solana Drive is a short street between San Luis Road and Mission Road. The northern terminus of Solana Drive is near the southern end of the County Park. Petitioners and Their Interests Petitioners are The Timbers Homeowners’ Association, Inc. ("HOA"), and Brian Moran and Christy Baldwin, individually. The individual Petitioners each own one or more units within The Timbers. Ms. Baldwin has resided there for nearly ten years. The HOA is charged with representing the interests of the owners and residents of The Timbers. It owns and has responsibility for the repair, maintenance, and improvement of the common areas within the development. Mr. Moran and Ms. Baldwin are officers of the HOA. The Timbers is a 223-unit condominium community that fronts, along its entire length, the south side of Mission Road between White Drive and Yonview Drive. A portion of this frontage is located directly across Mission Road from what is now Mission San Luis. The private road within The Timbers between Mission Road and White Drive is how The Timbers connects to the public road system. As it fronts Mission Road, The Timbers is a pleasant, wooded community of multiple condominium structures, each of which fronts on a side street connected to its private "San Luis Road." The Timbers is conveniently located for easy access to Florida State University, Florida A&M University, and other points to the south or east of The Timbers (including downtown Tallahassee). A significant number of residents of The Timbers use Mission Road by turning right onto Mission Road, which takes them to a right turn onto Ocala Road, with no stop sign, stop light, or significant intersection in between. From there, they can go straight south on Ocala Road or turn east or west on Tennessee Street. If the abandonment application is granted, that route would be eliminated, and there would be two remaining ways to leave The Timbers--via the White Drive exit, or by making two left turns, one onto Mission Road and the second, after a stop sign, onto White Drive. Meanwhile, drivers traveling east (toward town) on Mission Road from virtually all points west of The Timbers (and thus west of White Drive) on Mission Road, would take a right curve onto White Drive from Mission Road but they would do so with the right-of-way or, if signalized, a traffic light timed to give them a “longer green” preference. Those Timbers residents, owners, and visitors exiting at White Drive would have to negotiate their left turn without the right-of-way and against whatever increased traffic might be introduced onto White Drive if Mission Road were closed. From there, depending on the ultimate destination, traffic could either go straight on White Drive towards Pensacola Street or turn left onto Tennessee Street to reach the Tennessee Street/Ocala Road intersection. The intersection at White Drive and Tennessee Street is signalized but is not consistent with current design standards in that it has an offset center line. According to the planned unit development documents for The Timbers, the White Drive entrance was supposed to be the main entrance to the development. However, the Mission Road entrance has come to function more like the actual “main” and is more attractive aesthetically. Petitioners have spent significant effort and money in beautifying and otherwise maintaining its private extension of San Luis Road through curbing, landscaping, signage, etc. The part of the road that joins The Timbers to White Drive is not as well constructed and is not bounded by The Timbers but rather by other properties. It also is where the garbage dumpsters for the development are located. (On the other hand, the mailboxes for the development also are located off that part of the private road.) The closure of Mission Road probably will shift some internal Timbers traffic from the Mission Road entrance to the White Drive entrance. It also is possible that some external traffic coming south on San Luis Road might use the private extension of the road within The Timbers as a "short-cut" to White Drive. However, the road through the Timbers may not prove to be a desirable "short-cut" because it is a lower-quality road, has potholes, and is not designed for through-traffic but rather as a feeder road for the parking areas of the development. There are three stop signs; the turns are tight; and cars sometimes are parked along the side of the road. As a result, "friction" would slow through-traffic and discourage use of the road as a cut- through. The design of San Luis Road also makes it less likely that The Timbers would be used as a short-cut to White Drive. There is a hard right turn in the road signed for 15 miles per hour that people tend to avoid by turning onto right onto Solana Drive. Many residents walk within The Timbers, including to the mailboxes, to the tennis courts, and to the dumpsters, or to walk their dogs (perhaps in the green space created by an abandoned railroad right-of-way in the vicinity) on the western side of The Timbers. If traffic increases on that side of the private extension of San Luis Road, both the safety and the subjective experience of those pedestrians would be adversely affected to some extent. However, those effects are speculative. A resident-controlled gate system for the Mission Road entrance to prevent cut-through traffic likely would cost The Timbers HOA in the neighborhood of $15,000. Associated costs for telephone connections to each of the units, electrical service, and maintenance would likely range from $75 to $80 per residential unit per year. But such a gate is not desired by Petitioners as it would constitute a significant inconvenience for Petitioners and others who reside in or visit The Timbers. Should the Timbers elect to install sidewalks along its San Luis Road to accommodate increased or shifted traffic within The Timbers, the costs associated with that could reasonably exceed $110,000, including engineering, permitting, utilities, and remediation. The owners of units within The Timbers would ultimately bear the costs of any needed improvements or additional maintenance that would result from a closure of Mission Road. However, it is speculative whether such measures will be needed or actually undertaken. It is possible that the owners of units in The Timbers might suffer some diminution in property value as a result of the proposed abandonment. According to a property appraiser, Richard Boutin, there will be diminution in value of approximately one percent of the value of units, which ranges between $120,000 and $150,000, that would materialize over time, taking two-to-five years to occur. Whether such a diminution in value actually will occur is uncertain. As described above, due to the location of The Timbers, the proposed abandonment will adversely affect Petitioners more than it will adversely affect most of the rest of the general public. Most of the greater adverse effects on Petitioners will be similar in kind to the adverse effects on most of the general public. At least one of the greater effects on Petitioners also is different in kind -- namely, some drivers probably will use Petitioners' private road as a cut-through. See Findings 9-10, supra. Standards for Abandonment Applications A guiding principle for all City Commission action is to act in the public interest. The City Commission must act in the public interest, whether stated in a regulation or not, including when acting on an application for abandonment of right- of-way. City Commission Policy 410 has been used as a guide for reviewing abandonment applications. Policy 410 provides: The City of Tallahassee will not consider any application for right-of-way abandonment, if the subject right-of-way is currently being used by the City, or if the City has any plans to use the right-of-way at some point in the future. Abandonment of a right-of-way must be demonstrated to be in the best interest of the general public. Neither abandonment of a right-of-way solely for the purpose of placing it on the tax rolls in its current state, nor abandonment of a right-of-way solely to benefit an abutting property owner, is considered to be sufficient to meet the test of "in the public’s best interest". Abandonment of right-of-way automatically reverts only to abutting property owners with one-half of the right-of-way going to each owner by operation of law upon adoption of a City ordinance. Provide applicant with a Quit [sic] Deed for recording, if the right-of-way is abandoned. Unlike ordinances, policies can be waived. Notwithstanding paragraph 1 of the Policy, the evidence was clear that the City abandons right-of-way that is in use, either explicitly or implicitly waiving paragraph 1. Over 90 percent of the abandonment applications processed by the City have been for rights-of-way that are currently being used, including some that were being used heavily. The actual standards for determining whether to abandon a road have been found in the other parts of Policy 410, especially in paragraph 2. Although Policy 410 had a sunset date of March 25, 1997, it has not been replaced, and the Planning Department continued to use it as a guide for review of abandonment applications. On February 23, 2005, the City Commission reviewed proposals from the Planning Department for modifications to the City’s abandonment policies, procedures, and fee requirements. The proposed modifications included revised procedures, added definitions, and added the following specific review criteria: The approval of the application shall not create any safety or public health hazard, including any environmental health hazard; The approval of the application shall not result in the preclusion of right-of-way or fee simple access to any existing parcel/lot of record; The approval of the application shall not result in the preclusion of access to any publicly-maintained facility or infrastructure; The approval of the application shall not create any condition inconsistent with the Tallahassee-Leon County Comprehensive Plan, including the Long Range Transportation Plan included therein; The approval of the application would not eliminate or preclude a street or bicycle/pedestrian interconnection that the City Commission intends to retain; The approval should not adversely affect service access required for any official public safety, utility service, waste collection service provider; the United States Postal Service; Leon County Schools (school buses); or TalTran. On February 23, 2005, the City Commission approved the modifications and approved the Planning Department's recommendation to repeal Policy 410 since the modification would be more definitive. The City Commission approved the Planning Department’s recommendations, and directed staff to draft an ordinance incorporating the proposed modifications to the abandonment policies, procedures, and fee requirements and to bring the ordinance back before the Commission for adoption. As of this date, due to staffing constraints, the Planning Department has not taken an ordinance back to the City Commission for review and action. Conditions of Abandonment The City's Planning Department has placed several conditions on the proposed abandonment to address issues raised by the reviewing departments during the processing of abandonment applications. Placing conditions on abandonment of right-of-way is authorized and common. A standard condition for abandonment is that easements be retained by the City for any utilities. It also is standard to require the maintenance of adequate emergency access for the fire and police departments. Also standard, a vehicular turn- around will have to be constructed at the new eastern terminus of Mission Road. To connect with other bicycle-pedestrian trails in the area and enhance these modes of transportation and the City's Bicycle-Pedestrian Master Plan, the Planning Department recommends that a bicycle/pedestrian easement around the perimeter of the Mission be dedicated to the public as a condition of the abandonment. Finally, the Planning Department recommends that the proposed abandonment be conditioned on payment by the State for signalization at the Mission Road and White Drive intersection if, within 12 months of the abandonment, traffic increases to a point where signalization there is warranted. In testimony, the Executive Director of the Mission, Dr. Bonnie McEwan, supported the idea of a bicycle/pedestrian easement for the City, and DEP did not oppose either the standard or recommended conditions of abandonment. Effects of New Mission Visitor Center on Pedestrian Safety The building that currently functions as a Visitor Center for the Mission is an adaptive use of a 1938 house. Limited restrooms are in a separate building next to the house. Currently, due to the lack of accommodations, frequent requests to hold major events, weddings, receptions, and special functions must be denied. Currently, Mission staff must cross Mission Road between their offices and the public northern section. Staff crossings are a cause for concern because of the limited sight- line distance around the curve in Mission Road to the west. They are warned regularly to use caution, but no other measures to protect staff have been implemented or requested to date. Currently, visitors to the Mission drive to the public parking area on the northern portion of the site. Visitors then remain on the north side of Mission Road until they return to their vehicles to leave. In 2006, the Florida legislature appropriated funds to build a new Visitor Center at the Mission. This Center will be in excess of 20,000 square feet and will include public classrooms, a place to show orientation films, exhibits, 20 public toilets, and a meeting room accommodating 250 people. The new Visitor Center will be a vast improvement over the current facility. The evidence was that the best location for the new Visitor Center is on the western portion of the Mission property south of Mission Road. The site was selected because it is relatively flat and because the relatively few archaeological remains there have been mitigated. The plans are to have people enter the Mission using the driveway entrance on Tennessee Street, park around the new Visitor Center, proceed through the Visitor Center for their orientation, and then walk to the main area of the park, where the re-created Fort, Mission, Apalachee Village, and rich archeological sites are located. If Mission Road is not abandoned, the visitors would be crossing just east and quite close to a sharp curve in the relatively narrow, canopy-like road, which has deep-cut banks. Petitioners suggest that the new Visitor Center could be put on the northern part of the site. Indeed, before the State acquired the land on the south side of Mission Road where it now intends to build the new Visitor Center, the State was planning to build it on the north side of the road. However, the evidence was that the recently acquired site on the south side of the road is better suited and would be a much greater benefit to the general public. In any event, the evidence was that the State is going forward with its plans for the new Visitor Center and already has proceeded with obtaining environmental and building permits for construction on the preferred site. A conservative count of on-site visitation at the Mission last year was 30,239. There are activities year-round, including costume interpretation, a living history program, special events, and camps, including every teacher planning day and break. Most of the Mission programming is geared towards children, and approximately ninety percent of the visitors are children. The State hopes and expects that visitors to the Mission will increase dramatically with construction of the new Visitor Center. The State continues to expect that a high percentage of these visitors will be children. The application for abandonment is based on the reasonable prospect of increased future use of the facility. The application for abandonment seeks to protect the expected increased number of visitors, including many groups of children, and staff from the danger of having to cross back and forth across Mission Road. Pedestrian safety in connection with the use of the planned Mission facilities is a clear benefit to the general public. The abandonment application also would enable the State to optimize the functioning of the Mission, which also benefits the general public. Negative Effects of Abandonment At the same time, granting the application for abandonment would cost the general public in other ways, which the Petitioners point out. The segment of Mission Road proposed to be abandoned has a "canopy-road-like feel" (although it is not officially designated as a canopy road). The public no longer would be able to experience driving on it. A traffic study done by Wilson Miller on behalf of the State confirmed that traffic on the segment of Mission Road in question is relatively light. Traffic count data from 2008 showed that the annual average daily traffic ("AADT") was 1,500 vehicles a day, including both directions. Approximately 57 percent of the 1,500 cars move in an easterly direction. By comparison, the AADT for other area roads in the vicinity is significantly higher: 9,000 vehicles for White Drive; 34,000 for Ocala Road; and 42,500 for Tennessee Street. Mission Road is classified as a minor collector road. The capacity of a minor collector is between 13,000 and 14,000 AADT. The AADT established by the Wilson Miller study is only about 10% of the road's capacity, which is very light for a minor collector road. If the application for abandonment is granted, traffic will shift to other roads. However, the Wilson Miller study was not an origin and destination study and was not sufficient to determine with any precision how the traffic would shift. For that reason, Petitioners' attempt to use the traffic study to identify and quantify the costs associated with such travel shifts was not convincing. Some increase in traffic on other area roads will occur, but it is speculative based on this record where the increases might occur, how large they will be, and whether they will result in the need for taxpayer-funded road and traffic construction. Petitioners contend that the proposed abandonment will shift some eastbound traffic on Mission Road to White Drive. If it does, White Drive is a major collector with recent improvements and excess capacity. Any additional traffic on White Drive would not be significant from a traffic planning standpoint. It might make the road network more efficient overall (even though certain trips may become less efficient). It is possible that the re-routing of traffic from the Mission Road and Ocala Road intersection may be significant enough to warrant a traffic signal at White Drive and Mission Road. For this reason, the City staff recommends, as a condition for abandonment, that the State pay for signalization at that intersection if the need arises within a 12-month period after the abandonment. Based on the evidence, it should not be anticipated that other road and traffic improvements will be necessary as a result of the abandonment, except perhaps reversal of the stop condition at Mission Road and San Luis Road and possibly a turn lane on Solana Drive at its Mission Road junction. Petitioners also contend that the value of the 1.34 acres of road right-of-way to be abandoned is a cost to the general public that should be considered. The appraised value of the 1.34 acres was $240,000, using an "across the fence" appraisal methodology and assuming high-density residential property "across the fence" even though the property on either side of the proposed abandonment would be park land, and the transfer of use from road to park would be from one public purpose to another public purpose. In any event, the City cannot legally "charge" for abandoning right-of-way, and the value of abandoned right-of-way is never a consideration in the City's review of an abandonment application. See Conclusion 77, infra. Petitioners also contend that the proposed abandonment will have the negative effect of hampering emergency response in the area. Any road closure could result in a longer emergency response time by a matter of minutes in a particular circumstance and, depending on the emergency, it is possible that a delay of mere minutes could be significant and even mean the difference between life and death. But the evidence was clear that, from any reasonable planning perspective, the proposed abandonment would not present significant difficulties to fire, hazardous material, or police responders, assuming that maintaining adequate emergency access into the Mission itself is made a condition of the abandonment. Geographic areas are assigned to Fire Department stations for primary response. The response routes of drivers are not assigned, but are instead discretionary on the part of the driver based on the time of day, traffic patterns, nature of the road, and possible school zones. The primary station is called as the First Due, with the secondary being Second Due, and so forth. Station 4, located at the corner of Pensacola Street and Appleyard Drive, is the First Due Station, or engine company, for the area of the proposed abandonment, including The Timbers. The typical route for Station 4 would be to travel from its location at Appleyard Drive and proceed to Tennessee Street, turn right and proceed east to White Drive, then turn left and proceed north to Mission Road. This route would not be affected by the proposed abandonment. The Second Due Station for this area is the Main Fire Station located at 327 North Adams Street. The probable emergency response route for a fire truck coming from this Station would be to travel west on Tennessee Street, go through the Ocala Road intersection with Tennessee Street, turn right and proceed north on White Drive, and turn right and proceed east on Mission Road. The alterative route of proceeding north on Ocala Road at the Tennessee Street intersection and turning left onto Mission Road would be extremely difficult to navigate for a large fire truck, particularly in light of traffic, and typically would not be the preferred route. The typical route from the Second Due station is not affected by the proposed abandonment. The Third Due station for this area is Station 8, which is located on Hartsfield Road. This Station is situated to the west of the Timbers and the Mission. A typical route from this Station to the Timbers would be to drive east on Hartsfield Drive and take one of several southerly connections to Mission Road, and then drive east on Mission Road to access The Timbers or the Mission. Another consideration for Fire Department emergency access is the specialized functions of certain stations in two areas--Urban Search and Rescue, and the Hazardous Material Response. The Urban Search and Rescue team provides specialized services including searching through collapsed buildings and piles of debris. The primary station response for Urban Search and Rescue is Station 4, and its access is unaffected by the abandonment. The primary Hazardous Material Response team is Station 2, located on Sharer Road. There is a secondary specialized station for hazardous materials response, Station 3, which is located on South Monroe Street at Paul Russell Road. In addition, all of the stations have some ability to provide hazardous materials response. Currently, a possible route from Station 2 to the Timbers eventually would take Ocala Road to Mission Road. However, this route is only available for single engine fire trucks. Due to the nature of the equipment it uses, the hazardous materials team may instead proceed along Interstate 10 to Capital Circle and head back east to the area. During a response to an incident, this specialized team would be driving en route, meaning with traffic and not in emergency mode, and the First Due station would already have sent a truck to the site along a route unaffected by the proposed abandonment. As for the Police Department, the main type of call from The Timbers has been for public disturbances, which are frequently related to parties and generally not emergencies. In the three years of calls, only one call received could be considered an emergency response, which was for a young lady who had erratic breathing after passing out from drinking too much alcohol. In contrast to the Fire Department, police patrol cars have no fixed locations but rather are constantly on patrol. Dispatch for police prioritizes current needs and locations of vehicles. The Police Department has a number of methods it can use to access an area in case of an emergency. In addition to the standard method of reaching an area by car, potential options to reach an area include by foot, bike, and helicopter. Even deployment of an armored car/tank type vehicle would be possible if the situation warranted it. If the abandonment occurs, there will be three main routes to access the area, including San Luis Road, White Drive, and Mission Road from the west. With the two entrances to The Timbers, these routes provide at least five different ways to access The Timbers. Some locations in the City, such as cul-de- sacs, have only one access route. The various approaches to the area in question provide more than sufficient access. The proposed abandonment would result in the elimination of a less-than-ideal intersection at Mission Road and Ocala Road. Resulting from the extension of Tennessee Street to the west of Ocala Road, the intersection at Mission Road and Ocala Road does not meet current design standards because it is too close to Tennessee Street. It is not unusual for cars turning right from Mission Road onto Ocala Road to cross two or three lanes within a very short distance in order to turn left onto Tennessee Street. This maneuver is dangerous and illegal. Of six accidents at the intersection over four years, five involved oncoming traffic striking a vehicle turning onto Ocala Road from Mission Road. In a three-month period in 2006 alone, there were three such collisions. One reason there are not more similar accidents appears to be that the danger is so obvious that most drivers--both those attempting the maneuver and those driving south on Ocala Road--use caution. In addition, many of the local residents have become quite skilled at negotiating the intersection. Another illegal maneuver at this less-than-ideal intersection is sometimes used by cars heading north on Ocala Road and crossing Tennessee Street. Since it is not possible to make a legal turn left onto Mission Road, some turn left into a business parking lot on the northwest corner of Tennessee Street and Ocala Road, drive through the business parking lot, and then turn left onto Mission Road. Petitioners contend that the proposed abandonment will shift traffic from the Mission Road/Ocala Road intersection to the White Drive/Tennessee Street intersection, which also is inconsistent with design standards due the centerline offset, making the left turn onto Tennessee Street from White Drive potentially dangerous. However, whether and how much traffic would be shifted to that intersection was not proven. In addition, most of the traffic experts who testified were more concerned about the dangers inherent in the Mission Road/Ocala Road intersection and thought elimination of the Mission Road/Ocala Road intersection would make the Ocala Road/Tennessee Street intersection more efficient. Comprehensive Plan The evidence was that, with the conditions recommended by the City's Planning Department, the proposed abandonment does not create any condition that is inconsistent with the Tallahassee-Leon County Comprehensive Plan, including the Long- Range Transportation Plan. Goal 2 of the Historic Preservation Element of the Comprehensive Plan is to “[e]nsure that all municipal and county actions encourage and promote the preservation of this community’s historic resources.” Closing the proposed portion of Mission Road will serve Goal 2 by supporting and satisfying Policy 2.1.3 (mitigate the impact of development on historic resources), Policy 2.1.5 (property listed in the Florida Master Site File), and Objective 2.4 (develop a land conservation program to protect historic resources). The proposed abandonment also is consistent with other parts of Goal 2, namely: Objective 2.5 (establish a program to protect significant archaeological resources); Policy 2.5.1 (mitigation of adverse impacts to significant sites); Policy 2.5.2 (archaeological sites to be filed with Florida Master Site File and Archaeological Sensitivity Zone Maps of Leon County); Objective 3.2 (provide for the interpretation of local government-owned historic resources in parks and other public lands); Policy 3.2.1 (support and encourage local projects involving walking, bicycling and driving tours through historic areas); and Policy 3.2.2 (include the existence of historic resources as a criterion in the acquisition of public parks). The recommended bicycle/pedestrian path easement condition is consistent with Goal 6 of the Conservation Element of the Comprehensive Plan, which encourages the City/County to "implement a county-wide greenways network . . . to provide for . . . educational and historical interpretive opportunities and increased opportunities for alternative modes of transportation." Goal 6 of the Conservation Element of the Plan and supporting Policies 6.1.1 through 6.1.4 were the origin of the Tallahassee-Leon County Greenways Master Plan. The intent was to link historic and natural resources throughout the community, linking them to residential, work, and business areas. The bicycle/pedestrian easement link San Luis City Park trails with an existing trail at the intersection of Tennessee and Ocala. The proposed abandonment is consistent with the Parks and Recreation Element of the Comprehensive Plan in that state facilities may be included to meet state-required levels of service. Parks are essential to a sustainable community. The Land Use Element of the Comprehensive Plan has the general goal of protecting natural and aesthetic environments and residential areas. One way to protect residential areas is not to route collector roadways through them. Everything adjoining the western boundary of the Mission is classified as Residential Preservation. Closing Mission Road will force traffic away from this area and protect 18 homes on San Luis Road from cut-through traffic. The Planning Department would downgrade area street classifications to "local streets" to reflect their true use and provide better neighborhood protection. Studies performed by the Planning Department resulted in a multi-modal transportation district and a greenways master plan. The City operates under the Tallahassee/Leon County Multimodal Transportation District Plan. That Plan focuses on bike paths, mass transit, and sidewalks to facilitate greater mobility with fewer roads. Service levels for bicycle paths in the San Luis area are close to critical. The bicycle/pedestrian easement will provide greater connectivity, thereby improving service levels. Many students reside in the vicinity of the proposed road closure and provision of a bike path connecting the areas north of Mission Road with the Ocala Trail south of Tennessee Street would attract more bicycle traffic in the hopes of changing the mode of transportation for college students. The City has a Tallahassee-Leon County Greenways Master Plan (Greenways Plan). The abandonment application provides an opportunity under the Greenways Plan. The bicycle/pedestrian easement will connect an existing trail at the intersection of Tennessee Street and Ocala Road to San Luis City Park. This is consistent with the Greenways Plan. The City has adopted the Bicycle and Pedestrian Master Plan (Bike/ped Plan). The purpose of the Bike/ped Plan is to facilitate greater awareness of bike and pedestrian facilities and to promote construction of new facilities. The bicycle/pedestrian easement would provide greater accessibility to existing amenities and infrastructure and meet the intent of the Bike/ped Plan. Petitioners argued that there already exists a better connection between the existing trail at the intersection of Tennessee Street and Ocala Road to San Luis City Park via Ocala Road and Continental Avenue. However, the evidence did not prove that the existing route would be safer or better than the connection that would become available as a result of the bicycle/pedestrian easement condition on the proposed abandonment. Even if it would be, an additional route and connection still would serve a public benefit. Petitioners also pointed out that State could dedicate an easement through its property for purposes of a bicycle/pedestrian connection without applying for abandonment of right-of-way and that the City never asked for such a dedication before the State applied for application of the right-of-way. But it is typical to consider such matters in the context of an application for abandonment. Alternatives to Abandonment Petitioners concede that pedestrian safety at the Mission San Luis "would be rendered perfect if the road were abandoned, closed, and eliminated." However, they contend that other steps could be taken to protect the pedestrians as well or better without abandoning the road. First, Petitioners suggest the alternative of a pedestrian crossing with a pedestrian-controlled stop light and advance warning flashers. This suggestion was supported by the testimony of Petitioners' traffic expert, Wayne Coloney. But he assumed there would be 360 feet between the pedestrian crossing and the curve in Mission Road. Actually, the pedestrian crossing would be only approximately 210 feet from the curve, which is less than the 330 feet that Mr. Coloney considered to be safe. The other traffic experts also believed that it would be unsafe to design a pedestrian-crossing that close to the curve, even with advance warning flashers--a design that works best on straight roads with long sight-line distances, such as Meridian Road. Next, Petitioners suggest the construction of an overpass. This would be a more expensive proposition. It would require the construction of ramps, stairs, and elevators to comply with the Americans with Disabilities Act. In addition, to be effective in protecting pedestrians, fencing would have to be installed for a considerable distance on both sides of the road to discourage pedestrians from crossing the road instead of using the overpass. According to Mr. Coloney, all of this would cost between $300,000 and $390,000 to install and between $20,000 and $30,000 to maintain. Both the overpass and the fencing would be at odds with the environment the State would be trying to re- create and maintain on the Mission property. Petitioners also suggest digging a tunnel under the road, which would be less obvious than an overpass. However, this also would require fencing to be effective and would be the most expensive of the suggested alternatives--costing between $450,000 and $690,000 to install. In addition, it would require digging a tunnel through artifact-rich earth, which would be contrary to the a primary purpose of Mission San Luis. Application of Findings to Standards Paragraph 2 of Policy 410 requires a demonstration that an abandonment of right-of-way is "in the best interests of the general public." It is clear that the proposed abandonment is not in any private interest since the abandonment is to the State for incorporation in its Mission San Luis, a public facility. The abandonment is not for the sole purpose of placing property on the tax rolls, or for the benefit an abutting private property owner. It is to benefit the public. It also is primarily to protect the safety of pedestrians working at and visiting the facility, including many school children. For these reasons, the abandonment clearly is in the public interest, as opposed to any private interest. Whether it is in the best interest of the general public is a more difficult judgment to make. But, on balance, the abandonment application, with the standard and recommended conditions, probably is in the best interest of the general public. The proposed abandonment also meets the new policy criteria for abandonment of right-of-way. It does not create any safety or public heath hazard, including environmental health hazard. It does not preclude access to any existing parcel or lot of record. It does not preclude access to any publicly- maintained facility or infrastructure. It does not create any condition inconsistent with the Comprehensive Plan, including the Long-Range Transportation Plan. It does not eliminate or preclude a street or bicycle/pedestrian interconnection that the City Commission intends to retain. It does not adversely affect any required service access for any official service provider.
Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Planning Commission recommend to the City Commission that DEP's application for abandonment of right- of-way be granted, with the standard and recommended conditions. DONE AND ENTERED this 2nd day of June, 2008, in Tallahassee, Leon County, Florida. S J. LAWRENCE JOHNSTON Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 2nd day of June, 2008. COPIES FURNISHED: Deepika Andavarapu Tallahassee-Leon County Planning Department 300 South Adams Street, Fourth Floor Tallahassee, Florida 32301-1721 William H. Davis, Esquire Dobson, Davis & Smith 610 North Duval Street Tallahassee, Florida 32301 Jonathan P. Sanford, Esquire Office of the City Attorney 300 South Adams, Box A-5 Tallahassee, Florida 32301 Lisa M. Raleigh, Esquire Office of the Attorney General The Capitol, Plaza Level 01 Tallahassee, Florida 32399
The Issue The issue for consideration in this proceeding concerns whether the Petitioner is entitled to a variance for installation of an on-site sewage disposal system ("OSDS") for property located near the Suwannee River in Dixie County, Florida, in accordance with the provisions of Section 381.272, Florida Statutes, and Chapter 10D-6, Florida Administrative Code.
Findings Of Fact The Petitioner is the owner of certain real property located in Dixie County, Florida, more particularly described as Lot 4, Wonderland Subdivision. The property is approximately 60 by 150 feet in size and was purchased in 1982 for a price of $9,000.00. It is presently appraised at $11,000.00; however, if an OSDS could be permitted and installed, the property would appraise for approximately $22,000.00. The lot was platted in 1957. On October 19, 1989, the Petitioner made an application for a variance from the OSDS permit requirements for the property. The application form indicated, and the Petitioner intends, that this would be a new system for a single-family residence. The residence would contain two bedrooms and would produce approximately 250 gallons per day of sewage flow. The Petitioner desires to construct a residence on the property to have a pleasant place to live and is suffering a hardship because of the investment which he has made in the property, which is of no use to him if he cannot obtain the subject permit or variance and install the OSDS so that he can construct his residence. Alternatively, he is unable to sell the property readily without the ability to obtain an OSDS permit or variance for the property. At the behest of the Respondent in the permit application or variance application process, the Petitioner obtained a survey of the property by a registered land surveyor (see Petitioner's Exhibit No. 2 in evidence). That survey resulted in a benchmark elevation being established of 12 feet above mean sea level ("MSL"). The site of the proposed OSDS installation is 11.71 feet above MSL. The ten-year flood plain elevation for this property is 16 feet above MSL, as verified by records of the Suwannee River Water Management District in evidence without objection. The property is also located within the regulatory floodway of the Suwannee River. Although the Petitioner acknowledged in a general way that he would be amenable to consideration of various alternative types of systems involving piping of sewage effluent to an appropriate upland disposal and treatment area, the use of chemical toilets or other appropriate non-discharge types of treatment and disposal systems, no concrete evidence was adduced from the Petitioner to establish that such are or are not reasonable alternatives to the conventional subterranean septic tank and drainfield type of disposal system with which the variance application is concerned. Consequently, the Petitioner's proof does not establish that no reasonable alternatives exist in order to secure the grant of a variance nor did the Petitioner's proof establish that the type of system proposed would not pollute the ground or surface waters or pose a threat to public health in terms of the standard subterranean OSDS or any alternative systems which the Petitioner might theoretically employ, including the types mentioned above. The Petitioner's proof simply did not establish that installation of a standard subterranean OSDS would only pose a minor deviation from the permitting statute and rules cited herein nor did the Petitioner establish that no reasonable alternatives exist to the establishment of a standard OSDS, as that relates to the substantiality of the hardship which the Petitioner is experiencing in not getting the OSDS originally requested permitted; and the Petitioner did not establish that any system proposed would not pose a threat to public health or pollute ground or surface waters. In summary, the Petitioner did not establish that a sufficient hardship is experienced, because reasonable alternatives have not adequately been explored and considered by the Petitioner nor made a part of the subject of Petitioner's proof nor has the Petitioner established that a grant of a variance would involve only a minor deviation from the permitting statute and rules standards because it has not been proven that the public health nor the ground or surface waters would not be adversely affected. Finally, because the property is located in the regulatory floodway of the Suwannee River, under Rule 10D- 6.047(6), Florida Administrative Code, before a mounded or filled OSDS could be permitted and installed, which is one alternative under consideration, a registered professional engineer must certify that the mounding of the system and installation of fill in the regulatory floodway area would not cause elevation of the "base flood" of the Suwannee River. No such engineering evidence or testimony has been adduced iii this proceeding; therefore, such an alternative system cannot herein be recommended for approval.
Recommendation Having considered the foregoing Findings of Fact, Conclusions of Law, the evidence of record, the candor and demeanor of the witnesses, and the pleadings and arguments of the parties, it is therefore, RECOMMENDED that a Final Order be entered denying the Petitioner's application for a variance from the statutory and regulatory requirements for an OSDS permit. DONE AND ENTERED this 10th day of December, 1990, in Tallahassee, Leon County, Florida. P. MICHAEL RUFF Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 11th day of December, 1990. APPENDIX TO RECOMMENDED ORDER IN CASE NO. 90-3111 Respondent' Proposed Findings of Fact: All of Respondent's proposed findings of fact are accepted. COPIES FURNISHED: Sam Power, Agency Clerk Department of HRS 1323 Winewood Boulevard Tallahassee, FL 32399-0700 Linda K. Harris, Esq. General Counsel Department of HRS 1323 Winewood Boulevard Tallahassee, FL 32399-0700 Marilou Clark Suwannee Plantation Realty Rt. 3, Box 73 Old Town, FL 32680 Frances S. Childers, Esq. Assistant District III Legal Counsel Department of HRS 1000 Northeast 16th Avenue Gainesville, FL 32609
Findings Of Fact JTA and DOT seek a complex air source permit from DER for construction of the Dame Point Bridge project in Jacksonville, Duval County, Florida. The application for the permit and supporting documents were filed and considered by DER in evaluating the permit. The proposed project is a 10.94 mile segment of a proposed easterly bypass around the City of Jacksonville. The project consists of a limited access, four and six-lane expressway which will become a portion of the Interstate 295 bypass system for Jacksonville. It will principally serve through traffic around urbanized Jacksonville and resident north-south traffic. The project extends from Monument Road, south of the St. John's River, to existing I-295 at U.S. 17, north of the River, and includes a six lane bridge over the St. John's River in the vicinity of Mill Cove and Dame Point. In addition to the bridge over the St. John's River, approximately 10,000 feet in length, the project includes seven grade separated intersections where major arterial roads serving urbanized Jacksonville intersect the project. The project will traverse high to medium density residential neighborhoods south of the St. John's River and medium to low density residential neighborhoods, developing industrial centers, and some rural property north of the River. Pursuant to Section 403.182, Florida Statutes, DER by formal agreement may delegate preview and evaluation of permit applications to qualified local programs. Such an agreement has been in force between DER and the Duval County Bio-Environmental Services Division since February 9, 1976. In compliance with that agreement, the Duval County Bio-Environmental Services Division reviewed and processed the Dame Point State Road 9-A extension application for a complex air source permit, determined that reasonable assurances of non-violation of ambient air quality standards was provided, and certified that conclusion to DER. DER then published a letter of intent to issue the permit on August 29, 1978. The Final Environmental Impact Statement (FEIS) for the project which was submitted with the application concluded that the project would be beneficial to the economic growth of the area by providing an improved transportation network. In addition, testimony established that the project would be needed in the near future by virtue of increasing traffic demand. Approximately forty to sixty percent of the north-south through traffic in the Jacksonville area is expected to use the facility. The proposed project would provide an efficient bypass for this traffic and could divert 7,000 to 10,000 vehicles per day from the downtown Jacksonville area upon completion. Evidence established that, as a direct result of construction of the project, downtown traffic congestion would be relieved; existing industry would receive more efficient transportation service; commuter traffic from southeastern Jacksonville to northern Jacksonville would be reduced by miles; transportation routes to education facilities would be improved; and tourist traffic would be routed around downtown Jacksonville. The benefits to costs ratio of the project is positive in that for every dollar spent to construct the facility, $2.80 might reasonably be expected to be returned to the community in the form of increased economic activity and more efficient transportation. Increased traffic demand in the Jacksonville-Duval County area is of such magnitude that, according to testimony at the final hearing, in the year 2000 the demand to cross the St. John's River is expected to exceed the capacities of all existing bridges, plus the proposed facility, if constructed, and another bridge crossing south of the city. JTA and DOT prepared projections for average anticipated future use of the project using the most recent, accurate and acceptable information available. Initial projections were based upon the Jacksonville Urban Area Transportation Study Network, 11WC. When the network was revised in 1977, JTA, in coordination with the Jacksonville Area Planning Board, revised the projections to be consistent with the updated Transportation Network plan for Jacksonville. This planning information, plus extensive historical data on population growth, urban development and changing land use patterns in the area of the project, were utilized to project future vehicle use for the project. The evidence clearly establishes that the proposed project generally will relieve downtown traffic congestion by diverting traffic around the city. Traffic projections indicate that the total vehicle miles traveled daily in Duval County might be reduced by as much as 600,000 miles if the project is constructed. Most of this reduction would result from eliminating circuitous routes through the downtown area. Traffic projections were in part based upon past experience with similar projects over a 10-year period, and included a factor for added traffic which might be generated by construction of the facility. The proposed project will be linked to I-95 north of Jacksonville, and will serve the southeast area of the city and provide a connection to the industrial center around Imeson Park to the north, in addition to offering a shorter and speedier route to local beaches. Average vehicle speeds through the open roadway portions of the project, and through intersections, were calculated according to commonly accepted traffic engineering methods. The evidence establishes that general roadway speeds should average 55 miles per hour through 1992, with a potential decline to 50 miles per hour by the year 2002. Average intersection speeds should vary from 45 to 20 miles per hour over the same time period. These calculations are based upon well-recognized and, long accepted traffic engineering data contained in the Highway Capacity Manual, 1965 edition. The method employed in these calculations is that commonly used by DOT throughout the State of Florida, and included consideration of potential future congestion as well as probable signalization of traffic at some intersections. The evidence establishes that JTA and DOT accurately analyzed roadway and intersection speeds for the proposed project according to accepted traffic engineering methods, and that reasonable predictions of air pollution loading along the project corridor based upon these speed calculations can reasonably be relied upon to establish non-violation of ambient air quality standards. Further, evidence in the record establishes that traffic speeds through the toll plaza to be constructed as a part of the proposed project were adequately analyzed. Average speeds and queuing through the toll booth facility were calculated using accepted average daily traffic projections for the project and assumed a 1,000 foot zone of deceleration/acceleration on either side of the toll booth. These calculations included deceleration, queuing, stopping at the toll booth, and acceleration away from the toll booth facility. The method employed in formulating these calculations followed recognized techniques outlined in the Transportation Traffic Engineers Handbook. DOT has asserted in the permit application here under consideration that the construction and operation of the proposed project will not violate DER ambient air quality standards. Using the traffic projections and average vehicle speeds discussed above, DOT utilized various computer modeling techniques which analyzed and modeled projected worst one-hour and eight-hour concentrations of carbon monoxide along the roadway and around critical intersections and the toll plaza. The Mobile I computer model was used to predict emissions of automobile related pollutants based upon the aforementioned traffic data. Included in the Mobile I computer program were various factors including highway speed, traffic volumes, vehicle mix, "cold" versus "hot" starts, ambient temperature, and pavement height. Emission factors generated from this computer model result in predicted pollutant loadings in grams per vehicle mile. In addition, another method, AP 42, Supplement 5, was also utilized to generate comparable emission factors. Data obtained from the Mobile I computer program and from AP 42, Supplement 5, is then programmed into another computer model, Caline II, which is a basic diffusion model designed to estimate concentrations of carbon monoxide at various points along and distances from the roadway. This computer model is a mathematical equation that simulates or predicts the concentration of pollutants at various points after they are released from their source and allowed an opportunity to mix with the atmosphere. The Caline II model can only project future expected carbon monoxide concentration levels. No computer model was used to project expected concentrations of hydrocarbons, nitrogen oxides, photochemical oxidants or other pollutants expected to be associated with the project because no such model is presently available to accurately project concentrations of those pollutants. This is due, at least in part, to the greater reactivity of those pollutants with other elements in the atmosphere. Factors included in the Caline II computer model in order to predict expected concentrations of carbon monoxide along a line source include traffic volume; a "K" factor, which is a percentage of daily traffic at a given point in "peak hour" conditions; highway width and height; wind speed; stability class; and wind direction. The result of this computer program is an expected "worst case" condition for one-hour and eight- hour concentrations of carbon monoxide along the roadway for the years 1982 and 1992. Computer program results, which included background ambient conditions for eight-hour concentrations, affirmatively established that expected concentrations of carbon monoxide will be considerably less than the DER one- hour standard of 40 milligrams per cubic meter, and the eight-hour standard of 10 milligrams per cubic meter. These DER standards were not exceeded at any of the intersections or along the roadway at any point. As indicated above, no computer modeling technique was utilized fox hydrocarbons, nitrogen oxides, photochemical oxidants, sulphur dioxide or total suspended particulate matter. Estimates concerning these pollutants were based upon AP 42, Supplement 5, which is a document promulgated by the United States Environmental Protection Agency, and the Mobile I computer program. These methods do not predict concentrations, but instead deal only with total emissions. The result of this analysis was that, given background levels of hydrocarbons in Duval County, the project, if constructed, either in whole or in the segment which is the subject of this permit application, hydrocarbon levels may be expected to be reduced, at least in part due to the increased average speed of vehicles using the proposed facility. In addition, since hydrocarbons appear to act as a precursor to the formation of photochemical oxidants, any reduction in the emissions of hydrocarbons can also be expected to reduce the levels of photochemical oxidants, which are a particular problem in Duval County, which has been designated a "non-attainment area" for photochemical oxidants. Further, data derived from AP 42, Supplement 5, and Mobile I, together with data from local monitoring programs, established that no violations of ambient standards are to be expected for nitrogen oxides and, since sulphur dioxide and total suspended particulate matter are not emitted in significant quantities from automobiles, no violation of air standards for these pollutants is to be expected as result of the project. In summary, testimony adduced at the final hearing demonstrated that studies submitted to DER in support of the permit application were prepared in accordance with valid, professionally and scientifically accepted methodologies. These studies adequately establish, not only that the project will not result in violations of state air quality standards, but that positive social, economic and environmental effects will accrue from construction of the proposed facility. Petitioners, JTA and DOT have submitted proposed findings of fact. Petitioner's Proposed Findings of Fact numbered 1 through 4 have been substantially adopted herein. JTA's and DOT's Proposed Findings of Fact have also been substantially adopted in this order. To the extent that proposed findings of fact have not been adopted in, or are inconsistent with, factual findings in this order, they have been specifically rejected as being either irrelevant to the issues in this cause, or as not having been supported by the evidence.
The Issue The issue for consideration in this case concerns whether the Petitioners are entitled to an on-site sewage disposal system ("OSDS") permit authorizing the installation of an OSDS on property which they own near the Suwannee River in Dixie County, Florida, in accordance with the permitting requirements of Section 381.272, Florida Statutes, and Chapter 10D-6, Florida Administrative Code.
Findings Of Fact The Petitioners are the owners of certain real property located in Dixie County, Florida, in the proximity of the Suwannee River. The property is described as Lot 38, Highpoint Suwannee Riverfront Estates. The lot in question is 82 feet by 141 feet in size and was purchased in April, 1988 for approximately $5000.00. The lot, and the subdivision it is in, was platted in 1983. On February 21, 1990, the Petitioners made application for an on-site sewage disposal system ("OSDS") permit, seeking to install such a system on this lot in order to be able to construct a vacation cottage on the lot The proposed cottage would contain one bedroom and would have a heated and cooled area of approximately 500 square feet. Upon reviewing the application, the, Respondent informed the Petitioners that they would need to have a surveyor establish the elevation of their lot, and particularly the site of the proposed OSDS installation, as well as to establish, through contact with the Suwannee River Water Management District, the ten-year flood elevation for the property. Accordingly, the Petitioners obtained a survey by `Mr. Herbert Raker, a registered land surveyor of Cross City, Florida. That survey shows a benchmark elevation of 13.09 feet above mean sea level ("MSL") That benchmark elevation is six inches above the actual grade surface of the lot so that the elevation at the proposed OSDS installation site is 12.59 feet above MSL. The ten-year flood elevation for the property is 15 feet above MSL, as established by data from the Suwannee River Water Management District contained in a report which is in evidence as Respondent's Exhibit 1. That flood elevation data was submitted to the Respondent by the Petitioners with the application for the OSDS permit. The property in question is located within the ten- year flood plain of the Suwannee River, and it is also located within the regulatory floodway of the River. On April 24, 1990, after advising the Petitioners of the denial of the OSDS permit application, the Respondent, by letter, advised the Petitioners that they should pursue a formal administrative proceeding rather than file an informal variance application before the Respondent's own Variance Board. The Respondent took the position that a variance could not be granted from the requirements of Rule 10D- 6.47(6), Florida Administrative Code, because the subject property was located within the ten-year flood plain of the Suwannee River and because of the Respondent's interpretation of the affect of the Governor's Executive Order 90- 14, which adopted by reference the Suwannee River Task Force recommendation that all such systems be prohibited within the ten-year flood plain. The Respondent thus declined to exercise its discretion, accorded it in the statute and rule cited hereinbelow, to entertain and consider a variance application. Finally, it is established that the lot in question is not subject to frequent flooding; but because the surface grade is beneath the ten-year flood elevation, the bottom of the drain field trenches absorption bed to be installed would also be beneath the ten-year flood elevation. In other respects, the property is a amenable to the installation of an effective OSDS because the wet season water table is 48 inches beneath the surface grade and would be more than 24 inches beneath the proposed drain field. The normal water table is approximately 60 inches beneath the surface grade. Appropriate limited soils are present beneath the first six inches of soil below the surface and consist of fine sand, light brown and brown fine sand, down to 60 inches, which is appropriate for effective subterranean treatment and disposal of sewage effluent. The Petitioners established a definite hardship on their part by the fact that they have paid a substantial sum for the lot and are now unable to develop it unless they receive entitlement to an OSDS or some reasonable alternative. In that regard, no sufficient proof of truly effective, reasonable alternatives was established by the Petitioners. However, they did establish that an anaerobic septic tank and drain field disposal system might be an effective alternative treatment and disposal method for the property in question. An aerobic system involves the injection of air into the attendant septic tank to support aerobic bacteria which break down and treat sewage at a faster, more effective rate than does the normal anaerobic bacteria-based system. The resulting effluent is substantially lower in BOD and suspended solids than is the effluent from the normal subterranean and anaerobic septic tank and drain field disposal system. The problem with such an aerobic system is that it involves mechanical equipment, especially, an external electric motor and pump to force air into the system. This is disadvantageous in that, if the equipment suffers a breakdown, then treatment and appropriate disposal of the effluent stops. The untreated sewage can then rise to the surface of the property or otherwise pollute ground or surface waters and potentially cause a public health hazard. Thus, such systems would require inspection periodically to insure that they are in adequate working order because if the mechanical system malfunctions, the system will continue to put effluent through its drain field without adequate treatment. In this circumstance, the occupants of the dwelling served by the system might not notice for long periods of time that it is inoperative because the system will continue to dispose of effluent, but just of an untreated nature. Accordingly, when the motor and air pump system becomes inoperative, there is less incentive for the owner to repair it. Thus, it is likely that if such a system were installed, some means would have to be found to insure that the owner keeps the system in good repair and working order. The means by which such an arrangement for insuring that such an aerobic system works properly at all times was not established in this record, however. Consequently, the Petitioners failed to establish that reasonable alternatives to the proposed conventional system exist and what they might consist of.
Recommendation Having considered the foregoing findings of Fact, Conclusions of Law, the evidence of record, the carndor and demeanor of the witnesses, and the pleadings and arguments of the parties, it is therefore, RECOMMENDED that a Final Order be entered denying the Petitioners' application for an OSDS permit. DONE AND ENTERED this 21st day of December, 1990, in Tallahassee, Leon County, Florida P. MICHAEL RUFF Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 21st day of December, 1990. APPENDIX TO THE RECOMMENDED ORDER IN CASE NO. 90-3112 The Petitioners filed no proposed findings of fact. Respondent's Proposed Findings of Fact: 1-9. Accepted. COPIES FURNISHED: Sam Power, Agency Clerk Department of HRS 1323 Winewood Boulevard Tallahassee, FL 32399-0700 Linda K. Harris, Esquire General Counsel Department of HRS 1323 Winewood Boulevard Tallahassee, FL 32399-0700 Betsy K. Lanier, pro se P.O. Box 238 Old Town, FL 32680 Frances S. Childers, Esq. Assistant District III Legal Counsel Department of HRS 1000 N.E. 16th Avenue Gainesville, FL 32609
The Issue Whether Martin County Comprehensive Plan Amendment 14-6, adopted by Ordinance No. 965 on December 16, 2014, is "in compliance," as that term is defined in section 163.3184(1)(b), Florida Statutes (2014).1/
Findings Of Fact The Parties and Standing Petitioner, Martin County Land Co. (Petitioner), owns real property and operates a business in Martin County. Respondent, Martin County (Respondent or County), is a political subdivision of the State of Florida with the duty and responsibility to adopt and amend a comprehensive growth management plan pursuant to section 163.3167. On December 16, 2014, the County adopted Comprehensive Plan Amendment 14-6 (the Plan Amendment), which proposes to revise Chapters 2, 4, 10, and 11 of the County's Comprehensive Growth Management Plan (Comprehensive Plan). Petitioner submitted written and oral comments to the County concerning the Plan Amendment during the period of time between transmittal and adoption of the Plan Amendment. Background and Existing Conditions The County's original Comprehensive Plan was adopted in 1990 and was challenged by the Department of Community Affairs (DCA) as not "in compliance." Since its inception, the Comprehensive Plan has been the subject of substantial litigation, most of which has little relevance hereto. At least once every seven years, local governments are required to undertake an evaluation and appraisal of their comprehensive plans. See § 163.3191(1), Fla. Stat. During this evaluation, local governments must amend their plans to reflect changes in state requirements. See § 163.3191(2). The statute also encourages local governments to comprehensively evaluate changes in local conditions, and, if necessary, update their plans to reflect said changes. See § 163.3191(3). Local government plan amendments made pursuant to section 163.3191 are commonly referred to as "EAR amendments." The County adopted its most recent EAR amendments in 2009, following an evaluation and appraisal of the Comprehensive Plan and changes in state requirements. The 2009 EAR amendments were challenged by a number of parties as not "in compliance." Administrative challenge to the EAR amendments concluded, and the amendments became effective, in 2011. One of the signature features of the County's Comprehensive Plan is the urban service districts (USDs). The USDs were created as part of the Comprehensive Plan after 1990. The purpose of the USDs is to regulate urban sprawl by directing growth to areas where urban public facilities and services are available, or programmed to be available, at appropriate levels of service. The County refers to this approach as an "urban containment policy." Public urban facilities and services are defined by the Comprehensive Plan as "[r]egional water supply and wastewater treatment/disposal systems, solid waste collection services, acceptable response times for sheriff and emergency services, reasonably accessible community park and related recreational facilities, schools and the transportation network." Notably, neither package wastewater treatment plants (package plants) nor onsite wastewater treatment systems (septic systems) are included within the definition of public urban facilities. Commercial, industrial, and urban-density residential development, as well as future development requiring public urban facilities, are concentrated within the primary USD. With few exceptions, development within the primary USD is required to connect to regional wastewater systems. The existing Comprehensive Plan allows interim development on package plants only if the developer agrees to connect to regional wastewater systems when those systems become available. With very limited exceptions, septic systems are not permitted for new residential development within one-quarter mile of a regional wastewater system. Rural development at one unit per two acres (one/two acres) and estate development not exceeding one unit/acre are concentrated in the secondary USD where a reduced level of public facilities are programmed to be available at appropriate levels of service. A minimum lot size of one-half acre applies to all development. Regional sewer service may be extended to serve residential properties exceeding the one-half acre minimum lot size, and where lot sizes are inappropriate for septic systems. Development outside the USDs is limited to low- intensity uses, including Agricultural (not exceeding one unit/20 acres), Agricultural Ranchette (not exceeding one unit/five acres), and small-scale services necessary to support rural and agricultural uses. Some residential estate development is allowed on the fringe of the USDs at one unit/acre. Regional sewer service may not be extended outside the USDs, and package treatment plants are allowed only to serve a limited category of commercial development titled "Expressway Oriented Commercial Service Centers." The existing Comprehensive Plan does not establish a standard septic system flow rate. The County follows the state standards established in Florida Administrative Code Rule 64E- 6.008, which provide for a residential rate of 10,000 gallons per day (gpd) and a rate of 5,000 gpd for non-residential uses. Expressway-Oriented Transit Commercial Service Centers In 1985, in anticipation of the construction of Interstate 95 (I-95) through the County, the County created an overlay land use category, Expressway-Oriented Transient Commercial Service Centers (Expressway Nodes), "to recognize the immediate and unique needs of the public traveling through the County." The overlay is limited to the I-95 interchanges with County Road 714 (CR 714 or SW Martin Highway), located in the northern central area of the County; CR 76 (CR 76 or Kanner Highway), located in the western urbanized area of the County; and CR 708 (CR 708 or SE Bridge Road), located in the southwestern area of the County. The overlay is not self-implementing. Future Land Use Element (FLUE) Policy 4.13.A8(5), governing Expressway Nodes, includes a number of requirements for a proposed development to qualify for the designation. Notably, an applicant for development at one of the nodes must submit a market feasibility analysis demonstrating need by the traveling public for the proposed services, submit a Planned Unit Development (PUD) zoning application, and fully fund all urban services needed to serve the development. Further, no Expressway Node will be approved outside the primary USD unless the developer provides shared water and wastewater facilities for all subsequent development at the same interchange. To qualify, the development parcel must be a minimum of five gross acres, directly accessible from a major arterial roadway, and located in whole within 1,320 feet of an access ramp and within 1,320 feet of the intersecting arterial roadway. Unless proven safe through an engineered traffic study, the access point may not be closer than 660 feet from an access ramp. Of the three interchanges, only Kanner Highway, and that portion of SW Martin Highway east of the I-95 interchange, are designated major arterial roadways. Southeast Bridge Road and SW Martin Highway west of the interchange, are minor arterial roadways. The County must amend its Comprehensive Plan in order to reclassify a minor arterial to a major arterial. A roadway is typically reclassified from minor to major arterial when some threshold of traffic volume (based on trip counts) is achieved. No evidence was introduced to establish the particular threshold which distinguishes a minor from a major arterial. No evidence was introduced to establish the length of time for which the segment of SW Martin Highway east of the interchange has been classified a major arterial, thus meeting a primary threshold for Expressway Node development of the eastern quadrants of the interchange. Of the three interchanges, commercial services for the traveling public are located only at Kanner Highway. The interchange hosts at least three gas stations, a variety of fast-food and dine-in restaurants, and two hotels. Commercial services for the traveling public are available at the I-95 interchange at Indiantown Road in Palm Beach County, 16 miles to the south of the Kanner Road interchange. Services are also available 18 miles north of Kanner Road at the I-95 interchange at Gatlin Boulevard in St. Lucie County. Services for the traveling public are also available at a rest stop on I-95 in Martin County. Petitioner challenges, on several grounds, the deletion of FLUE Policy 4.13.A8(5), which provides for the Expressway Nodes overlay category. Data and Analysis First, Petitioner argues the deletion of FLUE Policy 4.13.A8(5) is not supported by data and analysis, as required by section 163.3177(1)(f). That section requires plan amendments to "be based upon relevant and appropriate data and an analysis by the local government that may include . . . surveys, studies, community goals and vision, and other data available at the time of adoption" of the plan amendment. Id. The Expressway Nodes designation pre-dates adoption of the USDs in 1990. The I-95 interchanges at SW Martin Highway and Bridge Road are located outside the USDs and the property at those intersections is designated for Agricultural land use. Thus, commercial development at those interchanges is inconsistent with the County's urban containment strategy and is an exception to the prohibition of urban uses outside the USDs. Further, SE Bridge Road functions as a minor arterial roadway, a designation which has not changed in the 30 years since the Expressway Nodes category was created. As such, the interchange does not qualify for commercial development under the restrictions of the policy itself. The same is true of SW Martin Highway west of I-95. While SW Martin Highway is a major arterial east of the I-95 interchange, no developer has come forward with a proposal to develop any service business at that interchange. According to historic traffic counts from the I-95 interchanges at both Kanner Road and SE Bridge Road, traffic has generally increased both northbound and southbound on I-95. Between 1998 and 2013, average annual daily trips (AADT) increased by 30,000 on I-95 southbound from Kanner Highway and 14,500 southbound from SE Bridge Road. In that same period, AADT trips eastbound on Kanner Highway increased by 16,500, and eastbound on SE Bridge Road by 1,700. Similar increases in trip counts occurred at the interchange ramps between 2009 and 2013. At Kanner Highway, AADT counts on the northbound off ramp increased by 2,000, southbound off ramp by 1,000, northbound on ramp by 600, and southbound on ramp by 1,800. According to the Petitioner's expert, this general trend will eventually lead to congestion of the service facilities at Kanner Road, which will cause motorists to either skip the Kanner Road exit altogether, or return to I-95 in search of another exit with the needed services. The data indicate similarly-increased AADTs at the I-95 interchange at Indiantown Road, the next interchange south of Kanner Road where services and facilities are available to the traveling public. Petitioner's expert likewise concluded that services at the Indiantown interchange are "pretty much maxed-out" and would likely also become congested in the future. AADT trip counts are data which were readily available to the County from the Department of Transportation (DOT) when the Plan Amendment was adopted. Petitioner argues that the Plan Amendment ignores this readily-available data by deleting the Expressway Nodes category. Petitioner's argument assumes a couple of factors. First, it assumes the County has an obligation to provide services to the public traveling through the County. Neither the Comprehensive Plan, nor the Community Planning Act, requires the County to provide said services. Second, it assumes that increased traffic counts through the interchanges directly correlate with increased demand on the services located there. Petitioner introduced no evidence to support this assumption. Increased trips through the interchange could be attributed to increased employment in the urbanized area of the County from residents in Palm Beach or St. Lucie Counties, or from rural areas within Martin County. The County's witnesses agreed that I-95 traffic counts would be relevant to the County's determination to delete the Expressway Nodes designation. However, the evidence does not support a finding that retaining the Expressway Nodes overlay is the only appropriate reaction to that data. Assuming Martin County was required to provide services to the traveling public, Petitioner did not establish the capacity of said services needed to serve the public, thus requiring the County to maintain the overlay. With the exception of hotel services, Petitioner introduced no evidence regarding a level of service or the utilization rate of the services provided at either the Kanner Road or Indiantown interchanges. With regard to hotels, Petitioner introduced hotel occupancy rates published by Smith Travel Data, a hospitality- industry source of statistics on occupancy and vacancy rates. In March 2015, excluding the beach hotels, the County hotels had an aggregate occupancy rate of 92 percent. The average annual occupancy rate of County hotels is in excess of 72 percent. Elimination of the Expressway Nodes overlay is supported by the County's urban containment strategy, as well as its history relative to package treatment plants. The SW Martin Highway and SE Bridge Road interchanges are outside the primary USD where regional sewer service is available. As long as they remain outside the primary USD, the option for wastewater treatment at those locations is limited to package treatment plants. The County has a clear policy prohibiting new package treatment plants. Existing FLUE Policy 4.7A.4 prohibits all package treatment plants outside the USDs except to serve development at the Expressway Nodes. Development at the Expressway Nodes is the only exception to the prohibition. The Plan Amendment deletes FLUE Policy 4.7A.4, thus eliminating the exception to the prohibition on package treatment plants, which prohibition is preserved elsewhere. In 1984, when John Polley, now Director of Utilities and Solid Waste, began working for the County, there were 89 private package treatment plants. In 1990, the County began a campaign to eliminate package treatment plants. Fifty-three package treatment plants were eliminated after being identified as threats to the Indian River Lagoon, pursuant to the Indian River Lagoon Act. Another 17 were eliminated because they did not comply with Department of Environmental Protection (DEP) standards, or had become mechanically obsolete and prone to failure. The County has focused on extending sewer service in the primary USD in order to reduce the need for new package treatment plants to serve development. By 2006, the County had eliminated 70 package treatment plants. There are only 19 package treatment plants in the County, and few, if any, have been approved and permitted in the County since 1990. Existing FLUE Policy 4.7C.2 is titled "Evaluation of urban uses near I-95 interchanges," and requires the County to "have completed an evaluation of potential urban uses in the vicinity of the I-95 interchanges with CR 708 and CR 714" by 2012-2013, and requires that "[t]he results of these studies shall be incorporated into the [Comprehensive Plan] via Plan Amendment." The Plan Amendment deletes FLUE Policy 4.7C.2. Martin County Principal Planner, Samantha Lovelady, produced a memorandum on Expressway Nodes in support of the Plan Amendment. The memorandum does not state that it was prepared to implement FLUE Policy 4.7C.2, nor did Ms. Lovelady testify that she prepared it pursuant to that policy. To the extent that the memorandum "evaluates potential urban uses" at the specified intersections, it concludes that the services at Kanner Highway, the rest area on I-95, and services available along I-95 just north in St. Lucie County and just south in Palm Beach County, all of which developed since the policy was adopted in 1985, have rendered the designation unnecessary. The memorandum concludes that the "original goal of this policy [to provide services to the public traveling through the County on I-95] has been achieved." FLUE Section 4.2.A(9)(b) of the Comprehensive Plan finds that based on an evaluation of the Future Land Use Map (FLUM) in 2009, the "raw data appear to show a significant deficit of commercial land necessary to accommodate economic needs." Further, the section provides, "[a]ny attempt to remedy the deficits should be based on geographic area in order to reflect sustainability principles and provide population centers with necessary services in an orderly and timely fashion." Petitioner argues the County deleted the Expressway Nodes overlay despite this data showing a deficit of available commercial property. The lands within the Expressway Nodes overlay have a FLUM designation of Agriculture, not Commercial. Further, there are several preconditions necessary for any of the property at those interchanges to be developed for commercial use, including a market demand study, PUD rezoning approval, and in the case of SE Bridge Road and SW Martin Highway west of the interchange, a required plan amendment to reclassify those roadways as major arterials. The evidence does not support a finding that elimination of the Expressway Nodes overlay would remove property from the County's commercial land use inventory. Furthermore, this section speaks to providing necessary services to "population centers." Neither of the I-95 interchanges at SE Bridge Road or SW Martin Highway is a population center. Internal Consistency Petitioner further challenges elimination of the Expressway Nodes as contrary to section 163.3177(2), which requires all elements of a comprehensive plan to be consistent with each other. Petitioner alleges that the Plan Amendment creates an inconsistency with FLUE Goal 4.2 "[T]o alleviate the negative impacts of inadequate public facilities and services and substandard structures for affected areas in the County." Petitioner's expert testified that removal of the Expressway Nodes designation will result in a lack of facilities to meet the needs of future travelers "as demand begins to evolve." The objectives and policies implementing FLUE Goal 4.2 speak directly to areas in need of redevelopment, including creation of Community Redevelopment Areas. There is no evidence to support a finding that the SW Martin Highway and SE Bridge Road interchanges are areas in need of redevelopment. Next, Petitioner contends the Plan Amendment is inconsistent with FLUE Policy 4.7A.5, which provides, in pertinent part: Policy 4.7A.5. Development options outside urban service districts. Martin County shall provide reasonable and equitable options for development outside the urban service districts, including agriculture and small-scale service establishments necessary to support rural and agricultural uses. A small-scale service establishment shall be defined as a small, compact, low intensity development within a rural area containing uses and activities which are supportive of, and have a functional relationship with the social, economic and institutional needs of the surrounding rural areas. Petitioner's expert provided only conclusory testimony that the removal of the Expressway Nodes designation is inconsistent with this policy. FLUE Policy 4.7A.5 requires the County to allow some opportunity for development outside the USDs. There is no evidence on which to base a finding that the Expressway Nodes designation is the only allowance for development outside the USDs, thus removal of the designation does not conflict with this policy. Further, the Expressway Nodes designation, by its plain language, was created to serve the needs of the public traveling through the County. Deletion thereof does not conflict with a policy requiring some development to serve the needs of rural residents and businesses. FLUE Goal 4.8 requires of the County, as follows: To encourage energy conservation and promote energy-efficient land use and development that implements sustainable development and green building principles. Petitioner contends the Plan Amendment is inconsistent with this goal because travelers faced with congested facilities will travel further into the County along the intersecting roadways to find the desired services, thus increasing traffic and travel times, as well as use of hydrocarbons. The expert's testimony on this issue conflicts with his opinion that travelers faced with congested interchanges will either skip the interchange altogether, or re-enter I-95 to look for services at another interchange. On this issue, the expert's opinion is not accepted as credible. It is unreasonable to assume that a traveler would exit I-95 at an interchange which advertises no services and travel some distance on the crossroad in search of said services. Further, Goal 4.8 is implemented by objectives and policies which provide guidance for the County's land development regulations and which encourage green building standards and renewable energy resources. Petitioner appears to be taking the goal out of context. Finally, Petitioner cites FLUE Goal 4.10 and Policy 4.10B.2 as inconsistent with the Plan Amendment. The provisions read as follows: Goal 4.10. To provide for adequate and appropriate sites for commercial land uses to serve the needs of the County's anticipated residents and visitors. * * * Policy 4.10B.2. Criteria for siting commercial development. Commercial development shall be strategically directed to areas best able to accommodate its specific requirements of land area, site, public facilities and market location. The aim is to promote efficient traffic flow along thoroughfares, achieve orderly development and minimize adverse impacts on residential quality. Members of the public traveling through the County to other destinations are neither anticipated residents of, nor anticipated visitors to, the County. The Expressway Nodes designation was created to serve the "immediate and unique needs of the public traveling through the County." At hearing, Petitioner argued that the Plan Amendment was also inconsistent with provisions of the Economic Development Element of the County's plan. Inasmuch as Petitioner did not plead that issue in its Petition for Formal Administrative Hearing, the undersigned does not make any findings relevant thereto.3/ Balance of Uses Section 163.3177(1) provides, in pertinent part, as follows: The comprehensive plan shall provide the principles, guidelines, standards, and strategies for the orderly and balanced future economic, social, physical, environmental, and fiscal development of the area that reflects community commitments to implement the plan and its elements. This section applies to the County's Comprehensive Plan as a whole. No evidence was introduced to support a finding that the Comprehensive Plan, as a whole, fails to provide principles, guidelines, standards, and strategies for the orderly and balanced future economic, social, physical, environmental, and fiscal development of the County. Section 163.3177(6)(a)4. provides as follows: The amount of land designated for future planned uses shall provide a balance of uses that foster vibrant, viable communities and economic development opportunities and address outdated development patterns, such as antiquated subdivisions. The amount of land designated for future land uses should allow the operation of real estate markets to provide adequate choices for permanent and seasonal residents and business and may not be limited solely by the projected population. The Plan Amendment does not change the amount of land designated for any particular FLUM category. The Plan Amendment makes no change to the FLUM. Assuming, arguendo, that elimination of the Expressway Nodes overlay changes the amount of land designated for commercial use, that single change does not render the Comprehensive Plan out of balance or unable to foster vibrant, viable communities. The public traveling through Martin County to other destinations are neither permanent nor seasonal residents or businesses. Wastewater Treatment Options The Plan Amendment makes a number of changes in the wastewater treatment options available to serve development in the County. Within the primary USD, FLUE Policy 10.1A.2 requires all new subdivisions of less than one acre to be served by regional sewer. Under the existing Comprehensive Plan, only new subdivisions within the primary USD exceeding two units/acre must connect to regional sewer systems. FLUE Policies 4.7B.1 and 10.1A.2 prohibit the extension of regional sewer service into the secondary USD. Thus, new development in the secondary USD is limited to septic service (because package treatment plants are eliminated in another section of the Plan Amendment). FLUE Policy 10.2A.7 increases the threshold size of lots within new subdivisions which may be developed on septic systems. Where the existing Comprehensive Plan allows new subdivisions of half-acre lots to develop on septic, the Plan Amendment requires a minimum one-acre lot. Further, new development qualifies only if it is more than one-quarter mile from regional sewer system collection or transmission lines. Within the primary USD, approximately 100 undeveloped lots are located more than one-quarter mile from a connection point to the County's regional sewer service. FLUE Section 10.2.B prohibits development within the USDs on septic systems where regional sewer systems are available (i.e., within one-quarter mile of a regional service line). The same policy limits development on septic systems outside the USDs to "low density residential as permitted by the underlying future land use designation and small scale service establishments necessary to support rural and agricultural uses." FLUE Policy 10.1C.4 prohibits approval of development orders "where adequate water and sewer facilities cannot be provided." Similarly, FLUE Policy 10.1A.10 provides that development "shall not be approved where adequate regional water and sewage facilities cannot be provided, unless the development can meet the requirements for a [septic] system found in Policy 10.2A.7." Finally, FLUE Policy 10.2A.8 limits the maximum flow of septic systems to 2,000 gpd per lot. Taken together, the changes generally limit the type and density of future development allowed in the County. Within the primary USD, the Plan Amendment requires more dense development to connect to regional sewer systems while limiting use of septic systems to the lowest density development. Overall, the Plan Amendment encourages higher density future development and prioritizes regional service. These changes are consistent with the County's existing "urban containment policy" concentrating urban development within the primary USD. In the secondary USD, the Plan Amendment restricts future development to low density (one-acre lots) where regional service is not available within one-quarter mile, and requires all future development within one-quarter mile to connect. These changes have little practical effect because most of the secondary USD is slated for future development at a rural density of one unit/two acres, with some estate densities at one unit/acre. Outside the USDs, the Plan Amendment limits future development to low density residential, and limited commercial development to serve rural and agricultural needs, on septic systems. Petitioner's challenge focuses primarily on, and the majority of evidence introduced related to, the 2,000 gpd limit on septic tank flow. Petitioner challenges FLUE Policy 10.2A.8 and Section 10.2.B.2 on a number of grounds, each of which is taken in turn. Data and Analysis Section 163.3177 requires plan amendments to "be based upon relevant and appropriate data and an analysis by the local government." The statute provides, "[t]o be based on data means to react to it in an appropriate way and to the extent necessary indicated by the data available on that particular subject at the time of adoption of" the plan amendment at issue. Id. Further, "data must be taken from professionally accepted sources." § 163.3177(1)(f)2. The statute does not require original data collection by local governments. A septic system flow rate is the liquid flow rate of non-solid wastes (effluent) coming out of the residential or non-residential septic system after initial treatment. Septic systems are typically sized based on the flow rate. When the Comprehensive Plan was first adopted in 1982, the County adopted a maximum flow rate of 2,000 gpd. The 2,000 gpd standard was also the standard for the State of Florida at the time it was adopted by Martin County. In 1993, the Legislature amended the state standard to allow maximum flows of 10,000 gpd for all uses. See ch. 93-151 § 1, Fla. Laws. In 1998, the state standard for commercial facilities was reduced to 5,000 gpd, where it remains today. See ch. 98-151, § 7, Fla. Laws. Martin County did not adopt the state standard when it changed in either 1993 or 1998. The County maintained its lower maximum rate based on experience with septic system failures associated with poor maintenance, particularly of larger systems and commercial establishments, such as restaurants. The state standard was adopted by the County in its 2009 EAR amendments, which became effective in January 2011. Thus, the 2,000 gpd standard governed development in Martin County for almost 30 years. Despite the lengthy history of the 2,000 gpd standard in Martin County, the undersigned must find that the 2009 change to the higher state standards were supported by data and analysis since that change was found "in compliance" in 2011. Thus, the 2015 change back to the 2,000 gpd standard must likewise be based on data and analysis. The County identified protection of its ground and surface water bodies from contaminants associated with septic system effluent as the main reason for the change. In response to the Clean Water Act and the Florida Watershed Restoration Act, DEP implemented the Total Maximum Daily Load (TMDL) program. The program identifies water bodies which are "impaired" for a particular pollutant (i.e., exceeds the water body's capacity to absorb the given pollutant and still function for its designated use), and requires development of Basin Management Action Plans (BMAPs) to restore impaired waters. There are 32 impaired water bodies in Martin County. Among them are the St. Lucie Estuary and the Indian River Lagoon, which is part of the estuary. Both the estuary and the lagoon are impaired for nitrogen, among other contaminants. The lagoon is a brackish-water environment in which phosphorus occurs in high levels. The growth of algae and other microorganisms is limited in that environment by the availability of nitrogen in the ecosystem. Nitrogen is a "limiting factor." When too much nitrogen is present, algae and other microorganisms become overgrown. An overgrowth of algae consumes excessive amounts of oxygen and dissolved oxygen in the marine environment, a primary indicator of water quality. DEP adopted the TMDL for total nitrogen demand for the estuary in March 2009. The BMAP developed for the estuary includes both construction of stormwater management projects and conversion of particularly-identified developments from septic systems to regional wastewater service. In March 2013, the County identified first priority stormwater projects at a cost of $15,790,000, and second priority projects at a cost of $17,990,000. The County also identified ten subdivisions to prioritize for conversion from septic to sewer service at a cost of $88,140,000. Together with identified flood control projects, in 2013, Martin County estimated a grand total of $142,445,000 in projects to implement the BMAP. The County has extended sewer service to approximately 1,800 properties, converting approximately eight developments from septic to sewer service. Effluent from septic systems is only one source of nitrogen pollution to surface water bodies. Agriculture (from both fertilizer and animal waste), residential fertilizer, pet waste, and "atmospheric" nitrogen, are other sources of nitrogen pollution. A 2009 study by the Department of Health concluded that management of nitrogen sources, including septic systems, "is of paramount concern for the protection of the environment."4/ Initial treatment of raw wastewater occurs in the septic tank chamber, where solids settle to the bottom and liquids are separated from the solids. In this anaerobic (absent oxygen) state, the wastes are converted mainly to ammonia and ammonium (inorganic nitrogen). Septic tank effluent is then discharged to a drain field where nitrification occurs in an aerobic environment. Nitrification converts ammonium to nitrates in oxygen-rich unsaturated soils. Soils do not absorb nitrates, and much of the nitrates migrate to ground and surface waters causing contamination. If nitrogen remains in the oxygen-rich soil, it can be converted to nitrogen gas and eliminated through the atmosphere through the denitrification process. Carbon and other minerals must be present in the soil for denitrification to occur. Denitrification is also a slow process that occurs only in the vata zone, the oxygen-rich soil between the bottom of the drainfield and the top of the water table. The data and analysis, as well as the testimony presented at the final hearing, conflicted on the issue of how much nitrogen is removed from septic tank effluent through denitrification in Southeast Florida, where soils are well- drained, but the water table fluctuates seasonally. In September 2013, a study prepared for DEP estimated the amount of nitrogen load from removed septic systems to surface water bodies in Martin County, as well as the cities of Stuart and Port St. Lucie. The study "shows that the load estimates are strongly correlated with nitrogen concentrations in surface water quality data, suggesting that septic load is a significant factor for water quality deterioration."5/ In Martin County, where septic system removal was small scale, the study traced a majority of the removed nitrogen to specific water bodies.6/ The study found that the amount of nitrogen load is controlled by three factors: (1) length of flow path; (2) flow velocity; and (3) drainage conditions. The following excerpt is instructive: Figure ES-4 shows that the load estimate decreases with the mean length of flow paths; the two largest loads per septic system are for North River Shores and Seagate Harbor [in Martin County] where the flow paths are the shortest. . . . This is reasonable because longer flow paths result in more denitrification and thus smaller load estimate. In line with this, larger flow velocity corresponds to shorter travel time and thus smaller amount of denitrification and larger amount of load. . . . Figures . . . indicate that the setback distance should be determined not only by the distance between septic systems to surface water bodies but also by groundwater flow conditions (the distance probably plays a more important role here). The groundwater flow conditions are closely related to soil drainage conditions at the modeling sites. An October 2013 paper by Kevin Henderson, P.E., reviewed four studies between 1993 and 2011, and concluded that "[n]one of the studies are specific enough to [Southeast Florida] soils/groundwater aquifer to be definitive as regards nitrate nitrogen's fate once it becomes part of groundwater below a drainfield."7/ Henderson maintains that the Southeast Florida groundwater aquifer is low-flux. Henderson further reported that studies have shown that anticipated nitrogen and total nitrogen groundwater contamination "is consistently absent at distances of more than 40 feet from drainfields."8/ The County's soil and water expert, Catherine Riiska, disagreed, maintaining the Southeast Florida water table is seasonally-dependent, and fluctuates greatly between the wet and dry seasons. During the wet season, Ms. Riiska explained the drainage system is insufficient to keep the water table low during the rainy season. When the water table is high, there is little opportunity for denitrification and nitrates can be pulled directly into the water flow. While the experts disagreed as to how much nitrogen may be removed from septic tank effluent in Southeast Florida, the experts agreed that limiting the amount of potential flow from septic tanks will limit the amount of potential discharge, especially in the event of a failure of the system. Petitioner contends that the 2,000 gpd standard does not react appropriately to the data and analysis because it does not take into account factors other than effluent volume that contribute to total nitrogen loading from septic systems, such as distance to surface water bodies and size of area served by the septic system. The 2,000 gpd standard applies equally throughout the County regardless of location in proximity to surface water bodies. Septic systems can be regulated based on either flow or loading. Loading would be expressed in gallons per measure of property, such as gallons per acre per day. The County's Director of Utilities and Solid Waste, John Polley, agreed that, in terms of environmental impact, loading is a superior measure to flow rate. The County is not required to adopt the superior measure for environmental protection, but to adopt a measure which is supported by data and analysis. Finally, Petitioner contends that the 2,000 gpd standard is not based on data and analysis because it was chosen arbitrarily, without considering some less restrictive flow limit such as 3,000 gpd or 4,000 gpd. The 2011 change from the 2,000 gpd flow limitation to the higher maximum state standard was not supported by the Martin County Health Department. Robert Washam, a retired Environmental Administrator for the Martin County Health Department with more than 30 years' experience permitting and regulating septic systems in Martin County, testified and submitted in writing to the County as to his support for the change to 2,000 gpd. He iterated several reasons for his support, including the serious public health and environmental issues that can result from the failure of large septic systems; the documented failures of large systems inside the primary USD resulting in raw sewage flowing into wetlands, ditches, and eventually rivers; and the unsuitable soils and water table conditions for large septic systems in rural areas of the County.9/ Section 381.0065(4)(e) provides as follows: (e) Onsite sewage treatment and disposal systems must not be placed closer than: Seventy-five feet from a private potable well. Two hundred feet from a public potable well serving a residential or nonresidential establishment having a total sewage flow of greater than 2,000 gallons per day. One hundred feet from a public potable well serving a residential or nonresidential establishment having a total sewage flow of less than or equal to 2,000 gallons per day. Fifty feet from any nonpotable well. Petitioner's wastewater expert, Richard Creech, acknowledged in his testimony that these thresholds reflect that there is an opportunity for contamination of the public water wells by the larger septic systems. Mr. Creech also agreed that, if a septic system is not properly maintained, functioning, designed, and sited, it may present a problem to surface waters. Petitioner did not prove that the 2,000 gpd standard would not protect ground and surface waters from nitrogen loading. That issue is clearly a subject of fair debate. Balance of Uses/Operation of Real Estate Markets Section 163.3177(1), provides, in pertinent part: The comprehensive plan shall provide the principles, guidelines, standards, and strategies for the orderly and balanced future economic, social, physical, environmental, and fiscal development of the area that reflects community commitments to implement the plan and its elements. This section applies to the County's Comprehensive Plan as a whole. No evidence was introduced to support a finding that the Comprehensive Plan, as a whole, fails to provide principles, guidelines, standards, and strategies for the orderly and balanced future economic, social, physical, environmental, and fiscal development of the County. Section 163.3177(6)(a)4. provides that the amount of land designated for future planned uses "shall provide a balance of uses that foster vibrant, viable communities and economic development opportunities and address outdated development patterns." Petitioner contends the County failed to consider the economic impact of reducing the septic system flow rate to 2,000 gpd. Petitioner introduced no evidence regarding the effect of the 2,000 gpd limit on the future economic development of the County, only that the County failed to conduct economic analysis thereof. While the County conducted no formal economic analysis of the change, the County clearly considered the effect of that limit on type and size of future development in the County. The 2,000 gpd flow limitation was not a significant development constraint during the nearly 30 years that it was in effect. Septic system size determinations are governed by Florida Administrative Code Rule 64E-6.008. The rule associates a specific gpd rate for each type of commercial, industrial, and residential establishment, based on factors such as the number of seats or patrons, number of employees, and number of bedrooms. A four-bedroom home up to 3,300 square feet can be developed on a septic system with a 400 gpd flow rate, well within the 2,000 gpd flow established under the Plan Amendment. A 2,000 gpd flow rate will accommodate a 650-seat church without regular meal service (or 580 seats with weekly meal preparation), a 200-room hotel, and a 13,000 square foot office building. The substantial expansion of the County's regional wastewater system inside the primary USD has reduced the prospective amount of future development on septic systems. Approximately 100 acres designated for non-residential use are beyond one-quarter mile from sewer availability from Martin County. All other future non-residential development in the primary USD will be unaffected by the septic system flow limitation. The flow limitation does not prohibit more intensive non-residential development in the primary USD. Rather, it encourages developers to expend funds to connect to the regional system so that increased intensity may be obtained. The flow limitation will have limited, if any, impact on the balance of allowable uses in the secondary USD. The low densities and the lack of any approved commercial uses in that District make higher septic flows unnecessary. The same is true for areas outside the USDs, where future development is limited to agricultural, very low density residential (one unit/20 acres), and some minor commercial land uses. Higher flow septic systems are also unnecessary in that area. Based on concerns expressed by agricultural interests during the adoption process, the Plan Amendment allows agricultural uses to exclude consideration of a septic system associated with a residence on the same site. Thus, the County considered the impact of the flow limitation on the predominant industry in the County. Miscellaneous Issues In its Petition, Petitioner also raised the issue of whether the deletion of FLUE Policy 4.13.A8 is inconsistent with the Future Land Use Map which retains the overlay designation. Petitioner did not present any evidence on this issue. Thus, Petitioner did not prove the allegation beyond fair debate.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Economic Opportunity enter a final order determining that Plan Amendment CPA 14-6, adopted by Martin County on December 16, 2014, is "in compliance," as that term is defined by section 163.3184(1)(b). DONE AND ENTERED this 1st day of September, 2015, in Tallahassee, Leon County, Florida. S SUZANNE VAN WYK Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 1st day of September, 2015.
The Issue The issue for consideration in this proceeding concerns whether the Petitioner is entitled to an on-site sewage disposal system ("OSDS") permit authorizing installation of an OSDS on property which Petitioner owns near the Suwanee River in Dixie County, Florida, in accordance with Section 8l.272, Florida Statutes, and Chapter 10D-6, Florida Administrative Code.
Findings Of Fact The Petitioner is an owner, by joint tenancy, of real property located in Dixie County, Florida, more particularly described as part of Government Lot 1, Section 4, Township 11 South, Range 13 East; closely proximate to the Suwanee River at a location generally known as "New Pine Landing". The surrounding property is characterized by homes and mobile home,;, which have OSDS's installed and operating. The subject property has no improvements constructed thereon, although the Petitioner intends the placement of a 12X60 foot mobile home, containing two bedrooms and one bathroom. There is no OSDS of any type installed on the property at the present time. The subject property is approximately 18.5 acres in size. It was purchased on January 17, 1990, but the property in question has never been platted. On March 20, 1990, the Petitioner made application for an OSDS permit for the aforesaid property, which was denied by the Respondent's letter of denial dated April 23, 1990. The Petitioner was not afforded the opportunity to pursue an informal variance application through the variance procedure set up by the statute and rules cited hereinbelow. Rather, the Respondent, in its denial letter, indicated that, because of the perceived effect of the Governor's Executive Order, discussed hereinbelow, no variances were being granted and the variance procedure would be "bypassed" in favor of affording the Petitioner a formal administrative hearing before the Division of Administrative Hearings concerning the permit denial. The Petitioner testified generally concerning the character of the property in question and the general nature of the terrain and vegetation. The property is characterized by a wetland or swampy area at one end of the property and, in the area of the proposed installation site, the ground elevation is higher, with a benchmark elevation of 8.8 feet above mean sea level ("MSL"), as established by Herbert H. Raker, certified land surveyor, and depicted by Petitioner's Exhibit 2 in evidence. The Petitioner offered no testimony concerning the ground water levels, other than to say that at one point in time, he dug a three-foot-deep hole on the subject property near the septic tank installation site and observed no water in the hole. His testimony did not indicate at what season of the year the observation was made nor whether conditions were wet or dry at the time. The only concrete evidence concerning ground water level at this installation site was that offered by the Respondent, which indicates that the ground water level at the time of the site evaluation was 42 inches below the surface of the property in question at the proposed installation site and, through observation of "mottling1, of the soil, indicating the presence of dampness, that the wet season water table is 12 inches below the surface of the property. Likewise, the Petitioner professed to have no knowledge of the ten-year flood elevation for the property. The Respondent's evidence, derived from materials submitted by the Petitioner in furtherance of the application, consisting of a report from the Suwanee River Water Management District, establishes that the ten-year flood elevation is 14 feet above MSL for Suwanee River Mile 29, which corresponds to the location of the subject property. The property is also located within the regulatory floodway administered by the Suwanee River Water Management District. Rule 10D-6.047, Florida Administrative Code, mandates that before a mounded system for on-site sewage disposal can be installed, a certification by a registered engineer would be necessary to determine that installation of such a mounded system would not raise the level of the "base flood". No such engineering testimony or evidence has been offered in this proceeding, however. The Petitioner further testified in a general sense that it would be a hardship not to be able to) install the OSDS on the property, given the money paid to purchase the property and the intent by the Petitioner to use it for a residence. The Petitioner has no use for the property without being able to use it for a residence. The Petitioner, however, did not offer any testimony or evidence concerning alternatives to installing the proposed OSDS, nor did the Petitioner establish that installation of such a system or an alternative system would pose no adverse health effects on the Petitioner or members of the general public nor that it would pose no degradation to the surface or ground waters involved for purposes of the Petitioner establishing entitlement to a permit or a variance It should be remembered, however, that the Petitioners were not accorded the opportunity to avail themselves of the variance procedure because of the Respondent's interpretation of the Governor's Executive Order 90-14, which it opines precludes it from granting any variances, or permits for OSDS within the ten-year flood elevation. This leads to its advising the Petitioner that to apply for a variance in this instance would be futile. The Governor's Executive Order, which incorporated the "Suwanee River Task Force" recommendation to preclude such system; beneath the ten-year flood elevation was entered on January 17 1990. The Respondent has, in effect, interpreted that Executive Order as precluding it from exercising its discretion to entertain and grant or deny variance applications.
Recommendation Having considered the foregoing Findings of Fact, Conclusions of Law, the evidence of record, the candor and demeanor of the witnesses, and the pleadings and arguments of the parties, it is therefore, RECOMMENDED that a Final Order be entered denying the Petitioner's application for an OSDS permit without prejudice to the Petitioner applying for and seeking a variance from the statutory and rule requirements related to permitting, for the reasons found and concluded above; and without prejudice to pursuing an OSDS permit application at a later time should the Petitioner become able to demonstrate that alternative methods of treatment and disposal of the sewage effluent in question can feasibly be performed within the bounds of the standards enunciated in the above-cited statutes and rules concerning on- site sewage disposal permitting. DONE AND ENTERED this 19th day of December, 1990, in Tallahassee, Leon County, Florida. P. MICHAEL RUFF Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 20th day of December, 1990. APPENDIX TO RECOMMENDED ORDER IN CASE NO. 90-3120 Respondent's Proposed Findings of Fact: 1-9. Accepted. Petitioner's Proposed Findings of Fact: None filed. COPIES FURNISHED: Sam Power, Agency Clerk Department of HRS 1323 Winewood Boulevard Tallahassee, Florida 32399-0700 Linda K. Harris, Esquire General Counsel Department of HRS 1323 Winewood Boulevard Tallahassee, Florida 32399-0700 Mary Ann White and Inman White P.O. Box 756 Old Town, Florida 32680 Frances Childers, Esquire Assistant District Legal Counsel HRS District 3 Legal Office 1000 Northeast 16th Avenue Gainesville, Florida 32609