Recommendation Based upon the above findings of fact and conclusions of law it is recommended that the permit requested be issued in accordance with the recommendations and special provisions set forth in the staff report (attached thereto). Respectfully submitted this 3rd day of November, 1975, in Tallahassee, Florida. CHARLES C. ADAMS Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 3rd day of November, 1975. COPIES FURNISHED: Thomas C. Garwood, Jr., Esquire Post Office Box 231 Orlando, Florida 32802 John Wheeler, Esquire Post Office Box V West Palm Beach, Florida
Findings Of Fact The Applicant/Respondents, Melvin and Mary Thayer have applied to the Department of Environmental Regulation (Department) for a "dredge and fill permit" seeking authorization to remove an existing 32-foot wooden fence and install in its place a chain-link fence, which as originally applied for would not extend more than 32 feet waterward from the 64-foot mean sea level elevation of Alligator Lake as marked by the waterward end of the existing wooden fence. The fence proposed would be five feet high and would possess a gate at its landward end which would permit pedestrian passage in both directions around the near-shore area of the lake. The project site is located approximately 400 feet south of U.S. 441-192 and adjacent to Alligator Lake, lying one mile west from Bay Lake within Section 10, Township 26 South, Range 31 East in Osceola County, Florida. As clarified and amended prior to hearing, the application now requests the permit to authorize, instead, a 26-foot fence extending that distance waterward from the 64-foot mean sea level elevation. The Department has permitting jurisdiction under Chapters 253 and 403, Florida Statutes as well as Chapter 17-4, Florida Administrative Code. There is no dispute that the Department has jurisdiction of the permitting of the subject fence inasmuch as the fence would be constructed waterward of the 64-foot mean sea level elevation or the "high pool" level of Alligator Lake in Class III waters of the state. Additionally, the area of the project waterward of the 64- foot mean sea level elevation lies on sovereign lands of the State of Florida under the jurisdiction of the Department of Natural Resources. That Department, as yet, has not issued a permit for use of sovereign land for the intended purpose as envisioned by Section 253.77, Florida Statutes. Ed Edmunson was tendered by both Respondents as an expert witness and was accepted as to his expertise in biological assessment of dredge and fill construction projects. It was thus established that the construction and installation of the fence and removal of the existing fence would cause no Class III water quality violations. Additionally, it was established that no navigational impediment would result from the fence as presently proposed which only involves a 26-foot fence extending from the 64-foot mean sea level elevation waterward in a perpendicular direction from the shore and near-shore of Alligator Lake. Parenthetically it should be noted that the original proposal involved extending the fence 32-feet waterward and then installing a right angle section parallel to the shoreline for an indeterminate distance. The right angle portion of the fence has been deleted from the permit application and the portion perpendicular to the shoreline has been amended from 32 feet down to 26 feet from the 64-foot mean sea level elevation. In that connection, it was established by witness Walter, accepted as an expert in the field of engineering, that on January 7, 1985, the water line of Alligator Lake was at 62.4 feet mean sea level elevation and the end of the existing 32-foot wooden fence was 16 feet from the then existing waterline of the lake. If the water in the lake was at the 64 feet mean sea level elevation or "high pool" stage, which has occurred on the average of once every three years, the water at the end of the fence would still be only .9 feet in depth at the waterward extreme end of the proposed 26-foot fence. Indeed, it was established with- out contradiction by the Applicant, Melvin Thayer, that in the 17 or 18 years he has observed the project site, that only "seven or eight inches of water is the most depth he has seen at the end of the fence." Thus, the fence as proposed to be installed, will pose no impediment or hazard to the navigation of fishing boats, skiing boats or other craft, and, in that regard, a dock in close proximity to the site of the proposed fence extends approximately 90 feet waterward at the present time. In view of the Petitioner's other objection to the fence concerning their feared loss of access to walk around the near-shore area of the lake to visit friends and the like, the permit applicants have agreed to install a gate for public access anywhere specified by the Department along the extent of the proposed fence. The testimony of Petitioner's witnesses, including a representative of the Game and Fresh Water Fish Commission, consists largely of objections to the precedent of permitting a private fence to be constructed in the waters of the state and on state water bodies, but no impediment to navigation has been established especially since the neighboring dock and numerous other docks around the shoreline of the lake extend waterward much farther than will the proposed fence. No degradation to water quality has been established to result from the proposed project. The fence has not been shown to be contrary to the public interest since it will not interfere with wildlife habitat or natural resources, nor impede navigation in any way, and was shown not to impede any public use of the lake or the near-shore area of the lake, in view of the access gate to be provided in the fence. In short, reasonable assurances have been provided that all permitting criteria within the Department's jurisdiction at issue in this proceeding will be complied with, although a permit from the Department of Natural Resources authorizing use of the state lands involved has not been issued as yet.
Recommendation Having considered the foregoing Findings of Fact, Conclusions of Law, the evidence of record and the pleadings and arguments of the parties, it is, therefore RECOMMENDED: That the application of Melvin and Mary Thayer for authority to remove an existing fence and to install a fence extending 26 feet waterward of the 64-foot mean sea level elevation of Alligator Lake with an attendant public access gate installed therein be GRANTED upon satisfaction of the above-stated condition. DONE and ENTERED this 15th day of January, 1986 in Tallahassee, Florida. P. MICHAEL RUFF Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 15th day of January, 1986. COPIES FURNISHED: Virginia M. Hoover, MSM Consultant 5366 East Space Coast Parkway St. Cloud, Florida 32769 Norman J. Smith, Esquire Post Office Drawer 1549 Kissimmee, Florida 32741 B. J. Owens, Esquire Assistant General Counsel Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32301 Victoria Tschinkel, Secretary Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32301
The Issue The issue in this case is whether Respondent, the Department of Environmental Protection (DEP), should grant the application of Respondent, Leland Egland, for an Environmental Resource Permit (ERP), Number 44-01700257-001-ES, to fill an illegally-dredged trench or channel in mangrove wetlands between Florida Bay and what was a land-locked lake, to restore preexisting conditions.
Findings Of Fact Since 1988, Applicant, Leland Egland, has resided in a home built on property he purchased in Buccaneer Point Estates in Key Largo, Florida, in 1986--namely, Lots 14 and 15, Block 2, plus the "southerly contiguous 50 feet." A 1975 plat of Buccaneer Point shows this "southerly contiguous 50 feet" as a channel between Florida Bay to the west and a lake or pond to the east; it also shows a 800-foot linear canal extending from the lake or pond to the north. Egland's Lot 14 borders Florida Bay to the west; his lot 15 borders the lake or pond to the east; the "southerly contiguous 50 feet" is between Egland's lots 14 and 15 and property farther south owned by another developer. See Finding 10, infra. Buccaneer Point lots in Blocks 1 (to the east) and 2 (to the west) surround the lake or pond and canal. The developer of Buccaneer Point applied to the Florida Department of Environmental Regulation (DER) in 1977 for a permit to dredge a channel, characterized as a flushing channel for the lake or pond, which was characterized as a tidal pond with replanted red mangroves. (There was no evidence as to the character of this pond before the 1977 permit application or if it even existed.) DER denied the permit application because the: proposal . . . to open a pond to Florida Bay . . . will connect an 800 linear foot dead-end canal. The pond and canal will act as a sink for marl and organic debris which will increase Biological Oxygen Demand and lower Dissolved Oxygen. The project is expected to result in substances which settle to form putrescent or otherwise objectionable sludge deposits and floating debris, oil scum, and other materials, in amounts sufficient to be deleterious. Based on the above, degradation of local water quality is expected. * * * Furthermore, your project will result in the following effects to such an extent as to be contrary to the public interest and the provisions of Chapter 253, Florida Statutes: Interference with the conservation of fish, marine life and wildlife, and other natural resources. Destruction of natural marine habitats, grass flats suitable as nursery or feeding grounds for marine life, including established marine soils suitable for producing plant growth of a type useful as nursery or feeding grounds for marine life. Reduction in the capability of habitat to support a well-balanced fish and wildlife population. Impairment of the management or feasibility of management of fish and wildlife resources. As a result, the proposed channel to Florida Bay was not dredged (although some of the lake side of the proposed channel apparently was dredged before the project was abandoned); the building lots surrounding the lake or pond (now known as South Lake) and canal were sold as waterfront lots on a land-locked lake without access to Florida Bay; and the "southerly contiguous 50 feet" was included with the conveyance to Egland, along with the Lots 14 and 15 of Block 2. The evidence was not clear as to the characteristics of the "southerly contiguous 50 feet" in 1977, or earlier. When Egland purchased his property in 1986, it was a mature mangrove slough with some tidal exchange between the lake and Florida Bay, especially during high tides and stormy weather. Some witnesses characterized the area of mangroves as a shallow creek in that general time frame (from about 1984 through 1988). According to Vince Easevoli, at least under certain conditions, a rowboat could be maneuvered between the lake and Florida Bay using a pole "like a gondola effect." But Egland testified to seeing Easevoli drag a shallow-draft boat through this area in this general time frame, and the greater weight of the evidence was that the mangrove slough was not regularly navigable channel at the time. During this general time frame (the mid-to-late 1980's) several Petitioners (namely, Stanley Dominick, John and Katherine Easevoli, and their son, Vince Easevoli) purchased property on South Lake. All but Vince built homes and resided there; Vince did not reside there until after Hurricane Andrew in 1992, but he sometimes stayed at the residence on his parents' property during this general time frame. In the early 1990's, the slough or creek became somewhat deeper, making it increasingly more easily passable by boat. Large storms such as Hurricane Andrew in 1992 and the "storm of the century" in 1993 may have contributed to these changes, but human intervention seems to have been primarily responsible. In 1994, Egland added a swimming pool south of the residence on his lots. During construction, some illegal filling took place. Several witnesses testified that the illegal fill occurred to the north of the creek, which was not affected. Vince Easevoli's lay interpretation of several surveys in evidence led him to maintain that illegal fill was placed in the mangrove slough and that the creek became narrower by approximately four feet and, eventually, deeper. But no surveyor testified to explain the surveys in evidence, which do not seem to clearly support Easevoli's position, and the greater weight of the evidence was that illegal fill was not added to the creek in Egland's "southerly contiguous 50 feet." At some point in time, hand tools were used to deepen the slough or creek and trim mangroves without a permit to enable a small boat to get through more easily. As boats were maneuvered through, the creek got deeper. Eventually, propeller-driven boats of increasing size were used to "prop- dredge" the creek even deeper. According to Petitioner, Tom Hodges, when he and his wife purchased their lot on the lake in 1994, it was possible to navigate the creek in a 22-foot Mako boat (at least under certain conditions), and their lot was sold to them as having limited access to Florida Bay. (There was evidence that access to Florida Bay could increase the price of these lots by a factor of three.) Petitioners Martha Scott and Marianne Delfino also purchased their property on the lake in 1994. Tom Hodges claimed to have seen manatees in the lake as early as 1994, but no other witnesses claimed sightings earlier than 1997, and the accuracy of this estimate is questionable. Even if manatees were in the lake during this time frame or earlier, it is possible that they used an access point other than the creek. At the southeast corner of South Lake in Buccaneer Point, there is a possible connection to a body of water farther south, which is part of a condominium development called Landings of Largo and leads still farther south to access to Florida Bay near a dock owned by Landings of Largo. While this connection is shallow, it may have been deep enough under certain conditions to allow manatees to pass through. Apparently not with manatees but rather with boaters from the lake in Buccaneer Point in mind, Landings of Largo has attempted to close this access point by placement of rebar; Landings of Largo also has placed rip-rap under its dock farther south to prevent boats from passing under the dock. However, there are gaps in the rip-rap, some possibly large enough for manatees to pass. In approximately 1995 or 1996, Egland observed Vince Easevoli and his father, John Easevoli, digging a trench through the mangrove slough with a shovel and cutting mangrove trees with a saw in Egland's "southerly contiguous 50 feet." Others were standing by, watching. Egland told them to stop and leave.6 These actions made the creek even deeper and more easily navigable by boat, which continued to further excavate the trench by such methods as "prop dredging." In 1997 Hany Haroun purchased property adjacent to South Lake where he lives with his wife, Christine. By this time, Florida Bay was easily accessible by boat from the lake, and Haroun paid $260,000 for the property. He estimated that his property would be worth about $150,000 less without boat access to Florida Bay. In approximately 1997, manatees began to appear in South Lake year round from time to time, especially in the winter months. In 1997, the Hodgeses saw one they thought may have been in distress and telephoned the Save Our Manatee Club and Dolphin Research for advice. Following the advice given, they used lettuce to coax the manatee over to their dock to check its condition and videotape the event. The manatee appeared healthy and eventually departed the lake. On subsequent visits, manatees have been seen and videotaped resting and cavorting with and without calves and possibly mating in the lake. Groups of as many as seven to eight manatees have been seen at one time in the lake. Tom Hodges, Vince Easevoli, and Hany Haroun testified that they have enjoyed watching manatees in the lake since 1997. It can be inferred from the evidence that Elaine Hodges also has enjoyed watching manatees in the lake. There was no evidence as to the extent to which other Petitioners enjoy watching manatees in the lake. In 1997, the ACOE began an investigation of the illegal dredging of Egland's "southerly contiguous 50 feet." According to Egland, he was in communication with ACOE; presumably, he told ACOE what he knew about the illegal dredging on his property. According to Egland, ACOE advised him to place posts in the dredged channel to keep boats out. When he did so, Tom Hodges removed the posts. Egland replaced the posts, and Hodges removed them again. When Egland told ACOE what was happening, ACOE asked him to try reinstalling the posts and screwing plywood to the posts to achieve a stronger, fence-like barrier. Hodges also removed these barriers, and Egland did not replace the posts or plywood barrier again. In 1998, ACOE mailed Egland a Cease and Desist Order accusing him of illegal dredging in his "southerly contiguous 50 feet" and demanding that he restore the mangrove slough to its previous conditions. Egland was angry at being blamed for the dredging and initially disputed ACOE's charges and demands. But ACOE and the United States Environmental Protection Agency (EPA), which accepted the role of lead federal enforcement agency on December 18, 1998, was seeking monetary civil penalties. In addition, Egland received legal advice that, if restoration were delayed, he could be sued for damages by someone purchasing property on the lake or canal in the meantime upon the mistaken belief that there was boat access to Florida Bay. For these reasons, Egland agreed to comply with the Cease and Desist Order. However, ACOE and EPA informed Egland that he might have to obtain a permit from DEP to fill the dredged channel in compliance with the Cease and Desist Order. On May 22, 2000, Egland applied to DEP for an ERP to restore a trench about 100 feet long varying from seven to ten feet in width that was illegally dredged on his property. He estimated that a total of 160 cubic yards of fill would be required, to be spread over approximately 900 square feet. He assured DEP that rip-rap would be used to contain the fill and that turbidity screens would be used during construction. During processing of Egland's application, DEP requested additional information, which Egland provided, and DEP's Environmental Manager, Edward Barham, visited the project site in October 2000. Based on all the evidence available to him at that point in time, Barham viewed Egland's proposed fill project as a simple restoration project to correct illegal dredging and return the mangrove slough to its preexisting condition. For that reason, Barham recommended that DEP process the application as a de minimis exemption and not charge a permit application fee. Subsequently, some Petitioners brought it to DEP's attention that manatees were accessing South Lake through the channel Egland wanted to fill. DEP saw no need to verify the accuracy of Petitioners' information or obtain additional information about the manatees use of the lake because DEP still viewed it as a restoration project. However, DEP decided that it would be necessary to include specific conditions in any ERP issued to Egland to ensure that no manatees would be trapped in the lake or otherwise injured as a result of filling the channel. Primarily due to the need for these conditions, and also because of anticipated opposition from Petitioners, DEP decided to charge Egland a permit application fee and not process the application as a de minimis exemption. DEP staff visited the mangrove slough on numerous occasions between October 2000, and final hearing and observed that the trench continued to get deeper over time as a result of continued prop-dredging and digging. In early August 2001, Tom Hodges observed a man walking back and forth with a wheel barrow between a storage shed on Egland's property and the channel. (Hodges was on his property across South Lake but use of binoculars enabled him to see this.) The next day, Hany Haroun discovered a poured- concrete slab forming a plug or dam in the channel on the lake side. Haroun reported his discovery to Tom Hodges, who investigated with his wife, who took photographs of the structure. At some point, the Hodgeses realized that a manatee was trapped in the lake. The manatee did not, and appeared unable to, use the other possible access point towards Landings of Largo to escape. See Finding 10, supra. The Hodgeses telephoned Barham at DEP to report the situation and complain. Tom Hodges then proceeded to break up the concrete, remove the resulting rubble, and place it on the path to the storage shed, freeing the manatee. The incident was reported in the newspaper the next day and prompted Petitioners to file their Motion to Dismiss and for Other Relief on August 9, 2001. See Preliminary Statement. The evidence was inconclusive as to who poured the concrete, or had it poured, and why. Egland testified that he was in Egypt on an extended trip at the time and denied any knowledge of the concrete plug until he saw the rubble on his property upon his return from Egypt. Egland testified that he saw no "aggregate" in the concrete, which would make it relatively easy to break up, and he suspected that Petitioners were responsible for pouring the concrete in order to publicly make false accusations against Egland. Petitioners denied Egland's accusation. Vince testified that the concrete contained rebar for strength. The evidence was inconclusive as to who was responsible for this incident. As pointed out by Petitioners, DEP did not investigate and does not know whether there is any freshwater upwelling in the lake, whether manatees have mated in the lake, or whether calves have been birthed in the lake. DEP also did not investigate and does not know whether South Lake is unlike other manatee habitat in the area. DEP did not investigate or obtain any information as to how many manatees use the lake, or what manatees use the lake for, in addition to the information provided by Petitioners. Carol Knox, an Environmental Specialist III with the Florida Fish and Wildlife Commission, testified as a manatee expert based on her knowledge of manatees and manatee habitat in the area, as well as the information known to DEP. It was her opinion that, regardless what South Lake might offer manatees in the way of habitat, closing the channel (with the specific conditions required by DEP to protect manatees during the filling itself) would have no adverse impact on manatees because it did not appear that manatees made use of the lake before the channel was dug in 1996 or 1997, and ample other manatee habitat of various kinds continued to be available in the area.7 Based on the testimony of Knox and Barham, and the totality of the evidence in this case, it is found that Egland provided reasonable assurance that his proposed restoration project will not harm or adversely affect manatees or their habitats. Petitioners also questioned Egland's assurances as to water quality. Vince Easevoli, Stanley Dominick, and Hany Haroun testified to their concerns that water quality in the lake will decline if the channel is closed. As Petitioners point out, DEP did not require Egland to provide any water quality measurements. This was because the proposal is reasonably expected to reverse the effects of the illegal dredging on water quality and to return both the water in the lake and canal and the water in Florida Bay to the quality that existed prior to the illegal dredging. Without requiring any water quality measurements, it is reasonably expected that the water quality in Florida Bay would not decline in any respect; to the contrary, if anything, Florida Bay's water quality would be expected to improve by reduction of contributions from the lake and canal. Conversely, water quality in the lake and canal would be expected to decline but not below what it was before the illegal dredging. Petitioners also question DEP's failure to require Egland to provide a survey or stake the area to be filled, so as to ensure against filling too much of the mangrove slough. But the proposed ERP contains a specific condition: "The final fill elevation of the fill shall be at the elevation of the substrate within the adjacent mangrove wetlands." Barham testified persuasively that this specific condition is adequate to provide reasonable assurance. Compliance can be ascertained by simply viewing the site after completion of the restoration project, and compliance can be enforced by requiring removal of excess fill as necessary. The proposed ERP also contains a general condition that the permit does not convey or create any property right, or any interest in real property, or authorize any entrances upon or activities on property which is not owned or controlled by Egland.
Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Respondent, the Department of Environmental Protection, enter a final order granting the application of Leland Egland and issuing ERP Number 44- 01700257-001-ES. DONE AND ENTERED this 25th day of November, 2002, in Tallahassee, Leon County, Florida. ___________________________________ J. LAWRENCE JOHNSTON Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 25th day of November, 2002.
Findings Of Fact Parties Respondent Sun East is a corporation who seeks to create a Planned Unit Development, PUD 89-25, on its property located in Polk County, Florida. Petitioner Hirt owns and resides on property adjacent to the Planned Unit Development. The only geographical boundary between the proposed project and Petitioner's property is Watkins Road. Respondent SWFWMD is the water management district with permitting authority over the 5.36 acres involved in the permit application which is the subject of these proceedings. Jurisdictional Areas of Controversy Respondent Sun East began the application process for a surface water management general construction permit from SWFWMD for Phase I of its proposed development of PUD 89-25 on July 1, 1991. SWFWMD determined the application was complete on July 24, 1991. The permit which was issued the next day authorized Respondent Sun East to perform the work outlined in the permit and shown by the application, approved drawings, plans, and other documents on file with SWFWMD. Petitioner Hirt timely filed a formal administrative complaint in which he disputed the appropriateness of the permit issued. In support of his position, Petitioner identified a number of areas of controversy and alleged that the application and review process was insufficient. Petitioner's allegations in his complaint, which are properly before the Hearing Officer, are as follows: The approved surface water management system will cause surface water runoff from the project to flood Petitioner's property. One potential cause of such anticipated flooding is the lack of proper percolation design in the surface water management storage areas. Contrary to permit representations, the property and the retention pond required by SWFWMD are in the 100 year flood plain. The project is in an environmentally sensitive area. Respondent Sun East has neither complied with all local requirements nor obtained all necessary federal, state, local and special district authorizations prior to the start of any construction authorized by the permit. Site Information The parcel of land on which the project will be located lies partially within the geographical limits of the South Florida Water Management District (SFWMD). The remaining land lies within the boundaries of the Southwest Florida Water Management District. Originally, SFWMD gave Respondent Sun East a permit to construct Phase I of the project, along with conceptual approval for Phase II. The decision by Sun East to file the application for a surface water management general construction permit with SFWMD instead of SWFWMD was based upon advice from personnel at SWFWMD. When it was later determined that SWFWMD would need to review an application for Phase I in order for the project to be properly permitted, SWFWMD acted quickly to reduce any potential delay to the project which could be attributed to its prior incorrect jurisdictional analysis. The agency's efforts were unrelated to any political connections or family relationships the former landowner, Jack Watkins, may have with past or current members of the Florida Legislature or Congress. The grading plan for Phase I of the project coupled with the pre- development and post-development 25 year storm event analysis, assessed drainage concerns associated with Phase I of the PUD. Water flow analysis for the site that considered existing conditions and proposed improvements, demonstrates that the property west of Watkins Road is not part of the surface water management system for this project. The cross drain beneath Watkins Road to the south of the proposed project deals with a different, natural conveyance system to Lake Pierce which is utilized by property owners such as Petitioner Hirt on the east side of the roadway. The proposed surface water management system for Phase I will not affect the drainage conveyance system utilized by property owners on the east side of Watkins Road. The stormwater management collection and conveyance system for Phase I was designed to convey the stormwater runoff from a 25 year 24-hour rainfall event, as required. It was not overdesigned to deal with a more intense, longer rainfall or storm event. Essentially, stormwater treatment and attenuation will be provided by the two proposed detention ponds A & B, as depicted on the site plan. Runoff from the first inch of rainfall will be filtered through a proposed side berm filter system in Pond A. The Polk County Soil Survey and field observations were used to assist in the weir control structure design. The weir was designed to restrict the post-development 25 year discharge to the pre-developed 25 year runoff rate. The project does not rely on percolation to offset post-development changes in the surface water management system design. As a result, percolation rates are not a factor to be dealt with in a design review. Flood Plain The 100 year elevation of 79 feet above mean sea level delineates the 100 year flood plain on the property in Phase I. According to the contour map, the existing Ponds 1 and 2 have depression contours below the flood plain. The water level in Existing Pond 1 is 78.24 feet. The water level in Existing Pond 2 is 78.14 feet. These ponds are not a major or significant part of an existing, natural surface water storage system in the area. They are just minor surface depressions. None of the lots contained in Phase I encroach upon the 100 year flood plain level. Environmental Concerns The parties stipulated at hearing that SWFWMD rule criteria relating to wetland and natural resource impacts were met by Sun East's general surface water management permit application. Local Requirements Prior to making application to SWFWMD for a permit in this case, Respondent Sun East obtained approval for Phase I of PUD 89-25 from Polk County. Since that time, the zoning approval was quashed by the circuit court. Respondent Sun East was ordered to obtain the SWFWMD permit before reapplying for zoning approval. The limiting conditions which are part of the permit issued by SWFWMD state: The permittee shall comply with all applicable local subdivision regulations and other local requirements. In addition the permittee shall obtain all necessary Federal, State, local and special district authorizations prior to the start of any construction or alteration of works authorized by this permit. The permit limiting conditions do not require that all other permits be acquired prior to the application for this permit. Instead, the limiting conditions advise that all other necessary permits must be acquired prior to construction or alteration of works begun pursuant to this permit. Petitioner began construction authorized by the permit after SWFWMD issued its permit approval on July 25, 1991. The Petitions for Certiorari on the final approval for Phase I from Polk County was already filed when the application for a permit from SWFWMD was requested by Sun East. The completed application does not reflect that the Polk County zoning approval was being challenged, and SWFWMD was not made aware of the possibility that it could be overturned at a later date. The permit issued by SWFWMD was timely challenged by Petitioner, before the approval became final agency action. Sun East did not comply with the limiting condition in the permit that requires a permittee to obtain all necessary authorizations prior to construction as the zoning approval was still unsettled when construction began. Petitioner's challenge to the SWFWMD permit was filed in good faith as numerous disputes of fact existed regarding this permit prior to resolution in this Recommended Order. Based upon the information and documentation given to Petitioner when the permit was issued, it reasonably appeared that his substantial interests were affected by the proposed drainage plan associated with the development.
Recommendation Based upon the foregoing, it is RECOMMENDED: That SWFWMD issue the general construction permit for the surface water management system for Phase I, within the limits indicated in the intent to issue, subject to conditions contained therein. That SWFWMD initiate an inspection of the stormwater management system at its expense to ensure conformity with the approved plans and specifications. That appropriate action be taken under Chapter 373, Florida Statutes, to prevent the continued violation of the limiting condition in the permit relating to construction starts. RECOMMENDED this 24th day of March, 1992, in Tallahassee, Leon County, Florida. VERONICA E. DONNELLY Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904)488-9675 Filed with the Clerk of the Division of Administrative Hearings this 24th day of March, 1992. APPENDIX TO RECOMMENDED ORDER, CASE NO. 91-5689 Joint Proposed Findings of Fact filed by Respondents are addressed as follows: Accepted. See HO #3. Accepted. See HO #3. Accepted. See HO #2. Accepted. See HO #4. Accepted. See HO #4. Accepted. Accepted. Accepted. See HO #20. Accepted. Accepted. Accepted. Accepted. See HO #19. Accepted. See HO #19. Rejected. Irrelevant. Rejected. Irrelevant. Rejected. Irrelevant. Rejected. Irrelevant. Accepted. See HO #25. Accepted. Accepted. Accepted. Rejected. Irrelevant Rejected. Contrary to fact. See HO #28. COPIES FURNISHED: ROBERT PERSANTE ESQ MERKLE & MAGRI 7650 W COURTNEY CAMPBELL CAUSEWAY - STE 1120 TAMPA FL 33607 ANDREW R REILLY ESQ REILLY & LASSEIGNE PO BOX 2039 HAINES CITY FL 33845 EDWARD B HELVENSTON ESQ DEPUTY GENERAL COUNSEL SOUTHWEST FL WATER MANAGEMENT DISTRICT 2379 BROAD ST BROOKSVILLE FL 34609 6899 PETER G HUBBELL/EXECUTIVE DIRECTOR SOUTHWEST FL WATER MANAGEMENT DISTRICT 2379 BROAD ST BROOKSVILLE FL 34609 6899 CAROL BROWNER/SECRETARY DEPT OF ENVIRONMENTAL REGULATION TWIN TOWERS OFFICE BLDG 2600 BLAIRSTONE RD TALLAHASSEE FL 32399 2400
The Issue The issue in this case is whether the South Florida Water Management District (SFWMD) should grant the application of Daniel Borislow, LLC, for an after-the-fact Environmental Resource Permit (ERP) and issue ERP 50-09272-P.
Findings Of Fact In 2007, Borislow bought 6.2 acres of land near the corner of Congress Avenue and Summit Boulevard in West Palm Beach. Borislow proceeded to create a soccer field on the property. The project required the addition of fill, the grading and leveling of the field and a shellrock driveway/parking area, and the installation of sod, an irrigation system, an exfiltration trench for water quality treatment, and lighting. Later in 2007, Borislow's activities came to the attention of SFWMD, which cited Borislow for conducting activities requiring an ERP without applying for and obtaining one. To resolve the enforcement action, Borislow agreed to apply for an after-the-fact ERP. Initially, SFWMD estimated primarily from aerial photography that 0.71 acres of wetlands were filled and impacted. During the permitting process, SFWMD's estimate of direct wetland impacts was reduced to 0.50 acres, and the mitigation required for direct and secondary2 wetland impacts was determined using the Wetland Rapid Assessment Procedure (WRAP).3 It was determined that Borislow's purchase of 0.2 of a freshwater herbaceous wetland credit in the Loxahatchee Mitigation Bank would offset the project's wetland impacts. SFWMD staff determined that all ERP criteria were met.4 Spots stipulated that there are no water quality issues, that no wetland-dependent endangered or threatened species of special concern have been observed at or in the area of the project site, and that the potential use of the site by such species is minimal.5 Spots contends: SFWMD underestimated the extent of impacted wetlands (and, therefore, the amount of mitigation did not offset the wetland impacts); reasonable assurance was not given that the project will not flood the Spots property to the north, in violation of permitting criteria in Florida Administrative Code6 Chapter 40E-4 and SFWMD's Basis of Review for ERPs (BOR); and reasonable assurance was not given that water storage and conveyance capabilities would not be adversely impacted, in violation of the permitting criteria in Rule Chapter 40E-4 and the C-51 basin compensating water storage requirements of Rule Chapter 40E-41, Part III. In normal permitting, existing wetlands are delineated in accordance with Rule Chapter 62-340. In this after-the-fact permit application, former wetlands had to be estimated. Spots reasonably contends that Borislow should not benefit from having filled wetlands without an ERP. But the evidence proved that the former wetlands on the Borislow property were properly estimated. Contrary to the contention of Spots, the wetlands were not estimated on the basis of a single aerial photograph. There were numerous aerial photographs over several years, which the experts could interpret and use to make a reasonable estimate of the extent of the former wetlands on the site. Ironically, while criticizing SFWMD's alleged reliance on a single aerial photograph to determine the extent of the former wetlands, Spots relied on a single aerial photograph to claim that the former wetlands on the Borislow property were deep and larger than 0.5. acres. The photograph appeared to show standing water only on the Borislow property, but it is possible that standing water on the Spots property was obscured by vegetation. In addition, it is impossible to determine the depth of the water from the aerial photograph, and there was no evidence as to the rainfall preceding the aerial photograph. Spots provided no other evidence to support its claim that more mitigation is needed to offset the wetland impacts. On the issue of flooding the Spots property, the evidence was clear that, contrary to the drawings in the ERP, the highest elevations in the northwest corner of the Borislow property are several feet south of the Borislow/Spots property line,7 and several feet higher than the elevation at the property line,8 causing surface water to flow down this slope from the Borislow property onto the Spots property. The evidence proved that no such "back-flow" existed in that location before the project. This "back-flow" can be prevented from crossing the property line by placing a swale or railroad tie or some other similar vertical retaining wall near or on the property line. Borislow has agreed to an additional ERP condition that this be done. The Borislow property is in sub-basin 30 of the C-51 basin. Spots and its engineering expert criticized the engineering calculations used by the experts for Borislow and SFWMD to provide reasonable assurance that the project did not result in a net decrease in water storage capacity in the basin. Spots contended that the calculations incorporated pre- development elevations taken from a 2005 aerial photograph. However, the more persuasive evidence was that the elevations used in the calculations actually came from survey information on surrounding properties, including the Spots property and Summit Boulevard, plus the control elevation in nearby Lake Worth Drainage District L-5 Canal. Elevations for the former wetlands on the Borislow property were assumed to be 10 feet NGVD9 based on the actual elevations of the existing wetlands on the Spots property. The testimony of the experts for Borislow and SFWMD as to the source of the elevations used in the calculations is accepted. The engineering calculations developed by Borislow's expert and accepted by SFWMD indicated a net increase in water storage capacity as a result of grading and leveling the property.10 The calculations compared pre-development and post- development storage capacity between the water table11 and the 100-year storm elevation, which was calculated to be 14.1 feet NGVD. The evidence did not adequately explain how grading and leveling the Borislow property would increase water storage; it would seem that no change in water storage would result. The engineering calculations assumed that no fill was deposited on the property. However, the evidence was that 150 to 300 truckloads of fill, each with 17 to 18 cubic yards, for a total of 2,625 to 5,250 cubic yards, were delivered to and placed on the property. If 300 truckloads were used, this would represent as much as an acre-foot of fill.12 Although the fill would have some water storage capacity, adding that much fill to the property logically would result in a net decrease in water storage capacity in the C-51 basin. This loss was not quantified, or compensated.13 Borislow testified that the fill was used to construct a 13-foot high, 330-foot long, 30-foot wide berm along the western perimeter of the property and another large berm along the northern and southern perimeters of the soccer field.14 But other evidence does not support Borislow's testimony. According to the drawings in the ERP, there are a total of 370 feet of berms, which are required to be a minimum of six inches high to maintain elevation 13.4 feet NGVD to contain the peak stage of a 10-year, 3-day design storm.15 Based on the ground level photographs in evidence, the berms do not appear to be anywhere near 13 feet high or 30 feet wide. In any event, the evidence does not prove that the fill deposited on the property was higher than 14.1 feet NGVD. Regardless of the exact dimension of the berms, it appears that the fill was deposited in a way that would result in a net decrease in water storage capacity in the C-51 basin. SFWMD seems to suggest in its PRO that the fill should be disregarded because there were no records to confirm the dates it was delivered, or the amounts delivered, and because it might have been delivered to an adjacent property.16 But the burden of proof was on Borislow. See Conclusion of Law 16, infra. There was no evidence to prove that Borislow had the fill deposited on an adjacent property. It is more likely that the fill was deposited on the Borislow property in large part to fill the former wetland, which probably was lower than 10 feet NGVD. Spots also charged that Borislow's project essentially obstructs the previous flow of surface water from the wetlands on the Spots property into the wetlands on the Borislow property, such that surface water now backs up on the Spots property. This appears to be true. Since it appears that the wetlands on the Borislow property were lower than the wetlands on the Spots property, grading and leveling would have that effect; adding fill would exacerbate the effect. Spots also argued that the evidence did not provide reasonable assurance on the ability of Borislow's system to recover from a 10-year, three-day storm event, so as to be able to again retain the surface water runoff from a successive storm of that magnitude and duration 12 days later. But the persuasive evidence was to the contrary, primarily due to the major drainage features in the vicinity--namely, the C-51 and the L-5 canals.
Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that SFWMD deny Borislow's after-the-fact ERP. DONE AND ENTERED this 10th day of August, 2010, in Tallahassee, Leon County, Florida. S J. LAWRENCE JOHNSTON Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 10th day of August, 2010.
The Issue Whether proposed Water Use Permits Nos. 20012236.000 (the Potable Water Permit) and 20012239.000 (the Irrigation Permit) and proposed Environmental Resource Permit No. 43020198.001 (the ERP) should be issued by the Respondent, Southwest Florida Water Management District (the District).
Findings Of Fact The Parties The individual Petitioners, Farnsworth, Roop, and Varnum are all Florida citizens and residents of Sumter County. None of the individual Petitioners offered any evidence relating to direct impacts that the ERP would have on their property. With respect to the Potable Water and Irrigation Permits, anecdotal testimony was presented by Petitioners and Wing and Weir relating to well failures and sinkholes in the area. Two Petitioners, Roop and Varnum, live in close proximity to the property encompassed by the three permits. Petitioner Farnsworth’s property is approximately three and a half miles from the project boundary. Wing and Weir live approximately four and a half to five and 18 miles from the project site, respectively. SCAID is a Florida not-for-profit corporation that has approximately 130 members. Farnsworth, the president of SCAID, identified only Roop and Varnum as members who will be directly affected by the activities to be authorized by the permits. The District is the administrative agency charged with the responsibility to conserve, protect, manage, and control water resources within its boundaries. The Utility and the Authority are limited liability companies, of which the Villages Inc. is the managing partner. The Villages Inc. is a Florida corporation. The Utility, which will serve as a provider of potable water, is regulated by the Public Service Commission, while the Authority which will provide irrigation water, is not. The Villages Inc., Development The Villages Inc. is a phased, mixed use, retirement community, which is located at the intersecting borders of Lake, Marion, and Sumter Counties. Development has been on going since at least 1983, with a current planning horizon of the year 2019. Currently, there are 15,362 constructed dwelling units in the built-out portion of the Villages Inc. that are located in Lake County and the extreme northeast corner of Sumter County. The portion located in Marion County is 60 percent complete, with 750 homes completed and another 600 under construction. Approximately another 22,000 residences are planned for development in Sumter County by the year 2012, with an additional 10,200 by the year 2019. However, the Potable Water and Irrigation Permits are only for a six-year duration, and the ERP has a duration of only six years. None of the permits authorize development activities beyond that time frame. Generally speaking, the three permits at issue include an area owned by the Villages Inc. that lies in northeast Sumter County South of County Road 466 and North of County Road 466A. However, it is not projected that this entire area will be built-out during the terms of three proposed permits. Area Hydrology and Topography In the area of the Villages Inc., there is a layer of approximately five to ten feet of sand at the land surface, which is underlain by ten to 70 feet of a clayey sand. Both of these constitute the surficial aquifer and are extremely leaky, allowing water to percolate easily through to a lower layer. Except in the vicinity of Lake Miona, there is no water in the surficial aquifer except after rainfall events. The clayey sand layer is underlain by the Upper Floridan, a limestone unit. The top of this limestone layer ("the top of the rock") occurs at fluctuating depths of between 30 and 70 feet. At approximately 350 to 400 feet below the land surface, there begins a transition to a denser unit that serves as a confining layer between the Upper Floridan production zone and the Lower Floridan production zone. This confining layer, which was confirmed by drilling at three locations in the Villages Inc. is approximately 150 feet thick in the area of the Villages Inc. Another transition, this time to a less dense formation, begins at approximately 550 to 600 feet, which is considered the top of the Lower Floridan production zone. While testing conducted on the project site indicated almost no leakage between the Upper and Lower Floridan production zones, it is generally known by experts that there is some exchange of water between the two layers. Both the Upper and the Lower Floridan contain water that meets potable water standards and both are considered water production zones. The water quality of the two zones is not significantly different. The project area is prone to karst activity, that is, the formation of sinkholes. Sinkholes are formed as a result of the collapse of the overburden above subsurface cavities which have been formed through a very gradual dissolution of limestone, thus resulting in a "sink" at the land surface. Surface water bodies in the area include Lake Miona, Black Lake, Cherry Lake, and Dry Prairie, as well as several other small wetlands. The Potable Water and Irrigation Permits The potable water permit is for the withdrawal from the Upper Floridan Aquifer of 1.164 million gallons of water per day (MGD), on an annual average, for potable use in residences and both commercial and recreational establishments. It also limits the maximum withdrawal during peak months to 2.909 MGD. The Irrigation Permit is for the withdrawal from the Lower Floridan Aquifer of 2.850 MGD, on an annual average, for use in irrigation. The peak month usage rate permissible under the proposed permit would be 9.090 MGD. Water withdrawal under the Irrigation Permit will be used for the irrigation of residential lawns, common areas, commercial landscaping, and golf courses. Modeling of Drawdowns In assessing the impacts of proposed water withdrawals from an aquifer, District personnel considered effects on the aquifers and on-surface water features in the area. Computer- generated models of the predicted effects of the Potable Water and Irrigation Permits withdrawals provided one of the principal bases for this assessment. The primary geologist assigned to review the permit applications reviewed two of the models submitted by the Utility and the Authority (jointly the WUP Applicants) and ran one personal model of her own in order to predict the effects of the proposed withdrawals on the aquifers, as well as on any wetlands and other surface water bodies. In particular, the models predict both the vertical and horizontal extent to which the withdrawals may lower the level of water within the aquifers and in-surface waters under various conditions. One of the models submitted by the WUP Applicants predicted drawdowns during a 90-day period of no rainfall while the other predicted the impacts of the withdrawals over the life of the permits, considered cumulatively with the effects of withdrawals from the already-existing Villages' development in Sumter, Marion, and Lake Counties. The District’s geologist modeled the impacts of the withdrawals over the life of the permits and included the cumulative effects of all of the current Villages' withdrawals in Sumter County. All of these models included the combined effects of both the proposed Potable Water and the Irrigation Permits. Based upon these models, it is concluded that there will be no significant drawdowns as a result of the withdrawals authorized by the proposed water use permits. Specifically, the only predicted drawdown in the surficial aquifer (0.25 feet of drawdown) is in an area where there are no natural surface water features. Drawdown in the Upper Floridan is predicted at between 0.1 and 0.2 feet, while the drawdown in the Lower Floridan is predicted at a maximum of 1.5 feet. These minor drawdowns are not expected to cause any adverse impacts. Transmissivity is the rate at which water moves horizontally through the aquifer. In areas with high transmissivity, the results of water withdrawals from an aquifer will generally be low in magnitude, but broad in lateral extent. Water withdrawals from areas of low transmissivity will result in cones of depression that are more limited in lateral extent, but steeper vertically. The use of too high a transmissivity rate in a model, would overpredict the horizontal distance of the drawdowns caused by withdrawals, but would underpredict the vertical drawdown in the immediate vicinity of the withdrawal. Conversely, use of too low a transmissivity would over-predict the effects in the immediate vicinity of the withdrawal but underpredict the lateral extent of the drawdown. The WUP Applicants’ models used a transmissivity value for the Lower Floridan Aquifer of 100,000 feet squared per day ("ft.2/d'). The WUP Applicants’ consultant derived the transmissivity values from a regional model prepared by the University of Florida. The regional model uses a transmissivity value for the entire region of 200,000 ft.2/d for the Lower Floridan. While that transmissivity is appropriate for assessing large-scale impacts, on a more localized level, the transmissivity of the aquifer may be lower. Therefore, the WUP Applicants’ consultant met with District representatives and agreed to use a value half that used in the University of Florida model. A similar approach was used for the transmissivity value used in modeling effects in the Upper Floridan. Notably, specific transmissivity values recorded in four wells in the Villages Inc. area were not used because two of these wells were only cased to a depth of just over 250 feet, with an open hole below that to a depth of 590 feet. Thus, the transmissivity measured in these wells reflect conditions in the confining layer at the immediate location of the wells - not the transmissivity of the Lower Floridan production zone. Further, site-specific information on transmissivity, measured during pump tests at individual wells, does not correlate well to the transmissivity of the aquifer, even at short distances from the well. Transmissivities measured at individual wells are used to determine the depth at which the pump should be set in the well, not to determine the transmissivity of the aquifer. Thus, the use of transmissivities derived from the regional model, but adjusted to be conservative, is entirely appropriate. Moreover, using a transmissivity in her modeling of the project impacts of 27,000 ft.2/d for the Lower Floridan Aquifer, the district geologist’s model predicted no adverse impacts. Leakance is the measure of the resistance of movement vertically through confining units of the aquifer. The leakance value used by the District for the confining layer between the Upper and Lower Floridan was taken from the University of Florida model. Tests conducted on the site actually measured even lower leakance values. Thus, the evidence establishes that the leakance value used in the WUP Applicants’ and the District’s modeling for the Floridan confining layer was reasonable and appropriate. Competent, substantial evidence also establishes that the leakance value used for Lake Miona was reasonable. The WUP Applicants submitted to the District substantial data, gathered over several years, reflecting the balance of water flowing into Lake Miona and the lake’s levels in relation to the potentiometric surface. This documentation verified the leakance value used for Lake Miona in the modeling. Finally, the District modeling used appropriate boundary condition parameters. The District modeling used what is known as the "constant head" boundary and assumes the existence of water generated off-site at the boundaries. Such a boundary simulates the discharge of the aquifer at a certain level. The use of constant head boundaries is an accepted practice. The modeling conducted on behalf of the District and the Applicants provides a reasonable assurances that the Potable Water and Irrigation Permits will not cause adverse water quality or quantity changes to surface or groundwater resources, will not cause adverse environmental impacts to natural resources, and will not cause pollution of the aquifer. Furthermore, because the predicted drawdowns are so insignificant, reasonable assurances have been provided that the withdrawals will not adversely impact existing off-site land uses or existing legal withdrawals. The modeling also provides reasonable assurances that the withdrawals will not be harmful to the water resources of the District. Moreover, monitoring requirements included in the proposed Potable Water and Irrigation Permits provide additional reasonable assurance that – should the withdrawal effects exceed those predicted by the modeling – such effects are identified and necessary steps are taken to mitigate for any potential impacts. The District has reserved the right to modify or revoke all or portions of the water use permits under certain circumstances. Specifically, the proposed Potable Water Permit requires a monitoring plan that includes the following pertinent provisions: There shall be no less than three control wetland and ten onsite wetland monitoring sites; A baseline monitoring report, outlining the current wetland conditions; * * * A statement indicating that an analysis of the water level records for area lakes, including Miona Lake, Black Lake, Cherry Lake, Lake Deaton and Lake Griffin, will be included in the annual report; A statement indicating that an analysis of the spring flow records for Gum Spring, Silver Spring, and Fenney Spring, will be included in the annual report; * * * Wildlife analyses for potentially impacted wetlands, lakes, and adjacent property owner uses or wells, including methods to determine success of the mitigation; A mitigation plan for potentially impacted wetlands, lakes, and adjacent property owner uses or wells, including methods and thresholds to determine success of the mitigation; An annual report of an analysis of the monitoring data . . . . Similar provisions are included in the proposed irrigation permit. The WUP Applicants, in conjunction with the District, have developed sites and methodologies for this monitoring. Reasonable Demand The water to be withdrawn under the proposed Potable Water Permit will serve 10,783 people. This total results from the simple multiplication of the number of residences to be built during the next six years (5,675) by the average number of residents per household (1.9). Those numbers are based upon historical absorption rates within the Villages Inc. development since 1983, an absorption rate that doubles approximately every five years. The Utility proposed a per capita use rate of 108 gallons per day for potable use only. District personnel independently verified that per capita rate, based upon current usage in the existing portions of the Villages Inc. and determined that the rate was reasonable. Based upon the population projections and the per capita rate, the District determined that there is a reasonable demand for the withdrawal of the amount of water, for potable purposes, that is reflected in the Potable Water Permit. The Utility has provided reasonable assurance regarding the Utility’s satisfaction of this permitting criterion. As to the irrigation permit, the Villages Inc. plans, within the next six years, to complete the construction of 1,911 acres of property that will require irrigation. The amount of water originally requested by the Authority for irrigation withdrawals was reduced during the course of the application process at the request of the District. The District determined the reasonable amount of irrigation water needed through the application of AGMOD, a computer model that predicts the irrigation needs of various vegetative covers. Since the Authority intends to utilize treated wastewater effluent as another source of irrigation water, the District reduced the amount of water that it would permit to be withdrawn from the Lower Floridan for irrigation. The District, thus, determined that the Authority would need 1.59 MGD annual average for recreational and aesthetic area irrigation and 1.26 MGD annual average for residential lawn irrigation, for a total of 2.85 MGD. The Villages Inc. also plans to accumulate stormwater in lined ponds for irrigation use. However, unlike its treatment of wastewater effluent, the District did not deduct accumulated stormwater from the amount of water deemed necessary for irrigation. This approach was adopted due to the inability to predict short-term rainfall amounts. The uncontroverted evidence of record establishes reasonable assurances that there is a reasonable demand for the amount of water to be withdrawn under the proposed irrigation permit. Conservation and Reuse Measures Both the Utility and the Authority applications included proposed measures for the conservation and reuse of water. The conservation plan submitted in conjunction with the irrigation permit application provides for control valves to regulate both the pressure and timing of irrigation by residential users; contractual restrictions on water use by commercial users; xeriscaping; and an irrigation control system for golf course irrigation that is designed to maximize the efficient use of water. In addition, in the proposed permits, the District requires the Utility and the Authority to expand upon these conservation measures through such measures as educational efforts, inclined block rate structures, and annual reporting to assess the success of conservation measures. The Authority also committed to reduce its dependence on groundwater withdrawals through the reuse of wastewater effluent, both from the on-site wastewater treatment facility and through contract with the City of Wildwood. Reasonable assurances have been provided that conservation measures have been incorporated and that, to the maximum extent practicable, reuse measures have been incorporated. Use of Lowest Available Quality of Water In addition to the reuse of treated wastewater effluent, the Authority intends to minimize its dependence on groundwater withdrawals for irrigation use through the reuse of stormwater accumulated in lined ponds. Thirty-one of the lined stormwater retention ponds to be constructed by the Villages Inc. are designed as a component of the irrigation system on-site. Ponds will be grouped with the individual ponds within each group linked through underground piping. There will be an electronically controlled valve in the stormwater pond at the end of the pipe that will be used to draw out water for irrigation purposes. These lined stormwater ponds serve several purposes. However, the design feature that is pertinent to the reuse of stormwater for irrigation is the inclusion of additional storage capacity below the top of the pond liner. No groundwater will be withdrawn for irrigation purposes unless the level of stormwater in these lined ponds drops below a designed minimum irrigation level. Groundwater pumped into these ponds will then be pumped out for irrigation. Thus, the use of groundwater for irrigation is minimized. The Authority has met its burden of proving that it will use the lowest quality of water available. With respect to the potable permit, the evidence establishes that there are only minor differences between the water quality in the Upper Floridan and Lower Floridan in this area. The Upper Floridan is a reasonable source for potable supply in this area. Thus, reasonable assurances have been provided by the Utility that it will utilize the lowest water quality that it has the ability to use for potable purposes. Waste of Water In regard to concerns that the design of the Villages Inc.'s stormwater/irrigation system will result in wasteful losses of water due to evaporation from the surface of the lined ponds, it must be noted that there are no artesian wells relating to this project and nothing in the record to suggest that the groundwater withdrawals by either the Utility or the Authority will cause excess water to run into the surface water system. Additionally, the evidence establishes that, to the extent groundwater will be withdrawn from the Lower Floridan and pumped into lined stormwater ponds, such augmentation is not for an aesthetic purpose. Instead, the groundwater added to those ponds will be utilized as an integral part of the irrigation system and will be limited in quantity to the amount necessary for immediate irrigation needs. Finally, the water to be withdrawn will be put to beneficial potable and irrigation uses, rather than wasteful purposes. Under current regulation, water lost from lined stormwater ponds through evaporation is not considered as waste. Thus, the Authority and the Utility have provided reasonable assurances that their withdrawals of groundwater will not result in waste. The ERP The stormwater management system proposed by the Villages Inc. will eventually serve 5,016 acres on which residential, commercial, golf course, and other recreational development will ultimately be constructed. However, the proposed permit currently at issue is preliminary in nature and will only authorize the construction of stormwater ponds, earthworks relating to the construction of compensating flood storage, and wetland mitigation. Water Quality Impacts The stormwater management system will include eight shallow treatment ponds that will be adjacent to Lake Miona and Black Lake and 45 lined retention ponds. Thirty-one of these lined ponds will serve as part of the irrigation system for a portion of the Villages Inc.'s development. All of these ponds provide water quality treatment. The unlined ponds will retain the first one inch of stormwater and then overflow into the lakes. The ponds provide water quality treatment of such water before it is discharged into the lakes. The water quality treatment provided by these ponds provides reasonable assurances that the project will not adversely impact the water quality of receiving waters. While they do not discharge directly to surface receiving waters, the lined retention ponds do provide protection against adverse water quality impacts on groundwater. There will be some percolation from these ponds, from the sides at heights above the top of the liner. However, the liners will prevent the discharge of pollutants through the highly permeable surface strata into the groundwater. The Villages Inc. designed the system in this manner in response to concerns voiced by the Department of Environmental Protection during the DRI process regarding potential pollutant loading of the aquifer at the retention pond sites. Furthermore, by distributing the accumulated stormwater - through the irrigation system - over a wider expanse of vegetated land surface, a greater degree of water quality treatment will be achieved than if the stormwater were simply permitted to percolate directly through the pond bottom. There is no reasonable expectation that pollutants will be discharged into the aquifer from the lined ponds. If dry ponds were used, there would be an accumulation of pollutants in the pond bottom. These measures provide reasonable assurances that there will be no adverse impact on the quality of receiving waters. Water Quantity Impacts With regard to the use of lined retention ponds, as part of the Villages Inc.’s stormwater system and the impact of such ponds on water quantity, the evaporative losses from lined ponds as opposed to unlined ponds is a differential of approximately one (1) inch of net recharge. The acreage of the lined ponds - even measured at the very top of the pond banks - is only 445 acres. That differential, in terms of a gross water balance, is not significant, in view of the other benefits provided by the lined ponds. As part of the project, wetlands will be created and expanded and other water bodies will be created. After rainfalls, these unlined ponds will be filled with water and will lose as much water through evaporation as would any other water body. The design proposed by the Villages Inc., however, will distribute the accumulated stormwater across the project site through the irrigation of vegetated areas. The documentation submitted by the Villages Inc. establishes that the ERP will not cause adverse water quantity impacts. The Villages Inc. has carried its burden as to this permitting criterion. Flooding, Surface Water Conveyance, and Storage Impacts Parts of the project are located in areas designated by the Federal Emergency Management Administration (FEMA) as 100-year flood zones. Specifically, these areas are located along Lake Miona, Black Lake, between Black Lake and Cherry Lake, and at some locations south of Black Lake. Under the District’s rules, compensation must be provided for any loss of flood zone in filled areas by the excavation of other areas. The District has determined, based upon the documentation provided with the Villages Inc.’s application, work on the site will encroach on 871.37 acre feet of the FEMA 100-year flood zone. However, 1,051.70 acre feet of compensating flood zone is being created. The Villages Inc. proposes to mitigate for the loss of flood zone primarily in the areas of Dry Prairie and Cherry Lake. At present, Cherry Lake is the location of a peat mining operation authorized by DEP permit. Mining has occurred at that site since the early 1980s. The flood zone mitigation proposed by the Villages Inc. provides reasonable assurance that it will sufficiently compensate for any loss of flood basin storage. The Villages Inc.'s project provides reasonable assurance that it will neither adversely affect surface water storage or conveyance capabilities, surface or groundwater levels or surface water flows nor cause adverse flooding. Each of the 45 retention ponds to be constructed on-site will include sufficient capacity, above the top of the pond liner, to hold a 100-year/24-hour storm event. This includes stormwater drainage from off-site. In addition, these ponds are designed to have an extra one foot of freeboard above that needed for the 100-year/24-hour storm, thus providing approximately an additional 100 acres of flood storage beyond that which will be lost through construction on-site. Furthermore, the Villages Inc. has proposed an emergency flood plan. In the event of a severe flood event, excess water will be pumped from Dry Prairie, Cherry Lake, and Lake Miona and delivered to the retention ponds and to certain golf course fairways located such that habitable living spaces would not be endangered. Environmental Impacts and Mitigation There are 601 acres of wetlands and surface waters of various kinds in the Villages Inc.’s project area. Forty-one acres of wetlands will be impacted by the work that is authorized under the ERP. Each of these impacted wetlands, along with the extent of the impact, is listed in the ERP. The impacts include both fill and excavation and all will be permanent. When assessing wetland impacts and proposed mitigation for those impacts, the District seeks to ensure that the activities proposed will not result in a net loss of wetland functionality. The object is to ensure that the end result will function at least as well as did the wetlands in their pre-impact condition. Functional value is judged, at least in part, by the long term viability of the wetland. While small, isolated wetlands are not completely without value, large wetland ecosystems – which are less susceptible to surrounding development – generally have greater long-term habitat value. The District’s policy is that an applicant need not provide any mitigation for the loss of habitat in wetlands of less than 0.5 acre, except under certain limited circumstances, including where the wetland is utilized by threatened or endangered species. Some wetlands that will be impacted by the Villages Inc.’s project are of high functional value and some are not as good. The Villages Inc. proposes a variety of types of mitigation for the wetlands impacts that will result from its project, all of which are summarized in the ERP. In all, 331.55 acres of mitigation are proposed by the Villages Inc. First, the District proposes to create new wetlands. Approximately 11 acres of this new wetland will consist of a marsh, which is to be created east of Cherry Lake. Second, it proposes to undertake substantial enhancement of Dry Prairie, a 126-acre wetland. Currently – and since at least the early nineties – Dry Prairie received discharge water from the peat mining operation at Cherry Lake. Without intervention, when the mining operations stop, Dry Prairie would naturally become drier than it has been for several years and would lose some of the habitat function that it has been providing. The Villages Inc.’s proposed enhancement is designed to match the current hydroperiods of Dry Prairie, thus ensuring its continued habitat value. Third, the Villages Inc. has proposed to enhance upland buffers around wetlands and surface waters by planting natural vegetation, thus providing a natural barrier. Placement of these buffers in conservation easements does not provide the Villages Inc. with mitigation credit, since a 25-foot buffer is required anyway. However, the District determined that the enhancement of these areas provided functional value to the wetlands and surface waters that would not be served by the easements alone. Fourth, the Villages Inc. will place a conservation easement over certain areas, including a 1500-foot radius preserve required by the Fish and Wildlife Conservation Commission (FWCC) around an identified eagles’ nest. These areas will also be used for the relocation of gopher tortoises and, if any are subsequently located, of gopher frogs. While the Villages Inc. is also performing some enhancement of this area, it will receive no mitigation credit for such enhancement – which was required to meet FWCC requirements. However, since the conservation easement will remain in effect in perpetuity, regardless of whether the eagles continue to use the nest, the easement ensures the continued, viability of the area’s wetlands and provides threatened and endangered species habitat. In order to provide additional assurances that these mitigation efforts will be successful, the District has included a condition in the proposed permit establishing wetland mitigation success criteria for the various types of proposed mitigation. If these success criteria are not achieved, additional mitigation must be provided. With the above described mitigation, the activities authorized under the ERP will not adversely impact the functional value of wetlands and other surface waters to fish or wildlife. The Villages Inc. has met its burden of providing reasonable assurances relating to this permit criterion. Capability of Performing Effectively The Villages Inc. has also provided reasonable assurances that the stormwater management system proposed is capable of functioning as designed. The retention ponds proposed are generally of a standard-type design and will not require complicated maintenance procedures. In its assessment of the functional capability of the system, the District did not concern itself with the amount of stormwater that the system might contribute for irrigation purposes. Rather, it focused its consideration on the stormwater management functions of the system. The question of the effectiveness of the system for irrigation purposes is not relevant to the determination of whether the Villages Inc. has met the criteria for permit issuance. Consequently, the record establishes that the documentation provided by the Villages Inc. contains reasonable assurances that the stormwater system will function effectively and as proposed. Operation Entity The Villages Inc. has created Community Development District No. 5 (CDD No. 5), which will serve as the entity responsible for the construction and maintenance of the stormwater system. CDD No. 5 will finance the construction through special revenue assessment bonds and will finance maintenance through the annual assessments. Similar community development districts were established to be responsible for earlier phases of the Villages Inc. The ERP includes a specific condition that, prior to any wetlands impacts, the Villages Inc. will either have to provide the District with documentation of the creation of a community development district or present the District with a performance bond in the amount of $1,698,696.00. Since the undisputed testimony at hearing was that CDD No. 5 has, in fact, now been created, there are reasonable assurances of financial responsibility. Secondary and Cumulative Impacts The Villages Inc.’s application also provides accurate and reliable information sufficient to establish that there are reasonable assurances that the proposed stormwater system will not cause unacceptable cumulative impacts upon wetlands or other surface waters or adverse secondary impacts to water resources. The system is designed in a manner that will meet water treatment criteria and there will be no secondary water quality impacts. Further, the use of buffers will prevent secondary impacts to wetlands and wetland habitats and there will be no secondary impacts to archeological or historical resources. In this instance, the stormwater system proposed by the Villages Inc. will function in a manner that replaces any water quantity or water quality functions lost by construction of the system. In its assessment of the possible cumulative impacts of the system, the District considered areas beyond the bounds of the current project, including the area to the south that is currently being reviewed under the DRI process as a substantial deviation. The District’s environmental scientist, Leonard Bartos, also reviewed that portion of the substantial deviation north of County Road 466A, in order to determine the types of wetlands present there. Furthermore, the District is one of the review agencies that comments on DRI and substantial deviation applications. When such an application is received by the District’s planning division, it is routed to the regulatory division for review. The District includes its knowledge of the DRIs in its determination that there are no cumulative impacts. Reasonable assurances have been provided as to these permitting criteria. Public Interest Balancing Test Because the proposed stormwater system will be located in, on, and over certain wetlands, the Villages Inc. must provide reasonable assurances that the system will not be contrary to the public interest. This assessment of this permitting criteria requires that the District balance seven factors. While the effects of the proposed activity will be permanent, the Villages Inc. has provided reasonable assurances that it will not have an adverse impact on the public health, safety, or welfare; on fishing or recreational values; on the flow of water; on environmental resources, including fish and wildlife and surface water resources; or on off-site properties. Furthermore, the District has carefully assessed the current functions being provided by the affected wetland areas. With respect to historical or archeological resources, the Villages Inc. has received letters from the Florida Department of State, Division of Historical Resources, stating that there are no significant historical or archeological resources on the project site that is the subject of this permit proceeding. Thus, the evidence establishes reasonable assurances that the Villages Inc.'s stormwater system will not be contrary to the public interest. Additionally, the District and Applicant presented uncontroverted evidence that the proposed project will not adversely impact a work of the District, and that there are no applicable special basin or geographic area criteria.
Recommendation Based on the foregoing findings of fact and conclusions of law, it is: RECOMMENDED that a final order be entered issuing Water Use Permit Nos. 20012236.000 and 20012239.000 and Environmental Resource Permit No. 43020198.001, in accordance with the District’s proposed agency action. DONE AND ENTERED this 24th day of June, 2002, in Tallahassee, Leon County, Florida. DON W. DAVIS Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 24th day of June, 2002.
The Issue Whether the applicants own the property in question? Whether the project would comply with the criteria of the South Florida Water Management District contained in Basis of Review for Surface Water Management Systems, specifically Sections 3.1.3 and 3.2? Whether flood protection would be inadequate or septic tanks unsuitable or whether the public health and safety would be compromised or the ultimate purchasers be deprived of usage of the property due to inundation in violation of Chapter 373, Florida Statutes (1981), or Rule 40E-4.301(1), Florida Administrative Code?
Findings Of Fact Ms. Williamson and Messrs. Leggett and Collins hold in fee simple a triangular 117.24-acre parcel in Okeechobee County as tenants in common under a warranty deed executed in their favor by one W. C. Sherman. They propose to develop the property as a trailer park (complete with airstrip) large enough to accommodate 109 trailers. To this end, soil would be dug up from the center of the property and used to raise the elevation of the surrounding land above the 100-year floodplain. (T. 47) The applicants have a dredging permit from the Department of Environmental Regulation authorizing them to excavate 629,889 cubic yards. They are proposing to dig to a depth of 76 feet below ground. This would create an 18-acre body of water ("Poe's Lake") which would overflow a V-notched weir into a county canal. The county canal would take the water to C- 38, one of the large canals to which the Kissimmee River has been relegated, at a point about 18 miles upstream from Lake Okeechobee. Runoff would wash over residential lots and roadways; the site would be graded to assure drainage into Poe's Lake. The minimum road crest elevation would be 30 feet NGVD ("[a]round twenty-nine feet" T.52), as compared to the control elevation for surface waters of 28.5 feet NGVD. WATER QUALITY The developers plan septic tanks for wastewater treatment. At the close of all the evidence, counsel for the applicants stated that sanitary sewers could be installed instead. Respondents' Proposed Recommended Order, p. With all the housing units in use, at least 10,900 gallons of effluent would seep into the ground from the tanks daily. There would be some evapotranspiration, but all the chemicals dissolved in the effluent would eventually end up in the groundwater. During the dry season, septic tank effluent would cause mounding of the groundwater and some groundwater movement toward, and eventual seepage into, Poe's Lake. The eventual result would be eutrophication and the growth of algae or macrophytes on the surface of Poe's Lake. This would cause dissolved oxygen violations in Poe's Lake. Discharges from the lake would inevitably occur, aggravating the situation in C-38, which already experiences dissolved oxygen levels below 5.0 milligrams per liter in the rainy summer months. Some fraction of the nutrients in the effluent from the septic tanks would ultimately reach Lake Okeechobee itself. The sheer depth of the excavation would create another water quality problem. Under the anaerobic conditions that would obtain at the bottom of Poe's Lake, bacteria acting on naturally occurring sulfates would produce hydrogen sulfide, ammonia and various other reduced organic nitrogen compounds. These substances are toxic to human beings and would, in some indeterminate quantity, enter the groundwater from Poe's Lake. This would affect the taste and perhaps the potability of water from any well nearby. It would be "possible to design a better system where there would be nutrient removal and a greatly reduced probability of violation of the dissolved oxygen criterion and obviation of the potential for ground water contamination." (T. 200) Installation of a baffle on the weir would serve to prevent buoyant debris from entering surface waters of the state. BASIS OF REVIEW Official recognition was taken of the "Basis of Review for Surface Water Management Permit Applications Within the South Florid Water Management District," parts of which all parties agree pertain in the present proceedings. Among the criteria stated in this document are: 3.1.3 Waste and Wastewater Service - Potable water and wastewater facilities must be identified. The Applicant for a Surface Water Management Permit must provide information on how these services are to be provided. If wastewater disposal is accomplished on-site, additional information will normally be requested regarding separation of waste and storm systems. 3.2.1.4 Flood protection - Building floors shall be above the 100 year flood elevations, as determined from the most appropriate information, including Federal Flood Insurance Rate Maps. Both tidal flooding and the 100 year, 3 day storm event shall be considered in determining elevations. b. Commercial and industrial projects to be subdivided for sale are required to have installed by the permittee, as a minimum, the required water quality system for one inch of runoff detention or one half inch of runoff retention from the total developed site. State standards - Projects shall be designed so that discharges will meet State water quality standards, as set forth in Chapter 17-3, Retention/detention criteria - Retention and/or detention in the overall system, including swales, lakes, canals, greenways, etc., shall be provided for one of the three following criteria or equivalent combinations thereof . . . Wet detention volume shall be provided for the first inch of runoff from the developed project, or the total runoff from a 3-year, 1-hour rainfall event, whichever is greater. Dry detention volume shall be provided equal to 75 percent of the above amounts computed for wet detention. Retention volume shall be provided equal to 50 percent of the above amounts computed for wet detention. 3.2.4.1 Discharge structures should include gratings for safety and maintenance purposes. The use of trash collection screens is desirable. Discharge structures shall include a "baffle" system to encourage discharge from the center of the water column rather than the top or bottom. 3.2.4.4.2 b. Control elevations should be no higher than 2 feet below the minimum road centerline elevation in the area served by the control device in order to protect the road subgrade. Simply detaining runoff before discharging it offsite will not insure that the water quality standards set forth in Chapter 17-3 will be met. Whether the standards are met depends on, among other things, the composition of the runoff. FWF'S INTEREST Among the purposes of the FWF, as stated in its charter, Shall be to further advance the cause of conservation in environmental protection, to perpetuate and conserve fish and wildlife, oil, water, clean air, other resources of the State and so manage the use of all natural resources, that this generation and posterity will receive the maximum benefit from the same. (T. 248-9) Four or five thousand Floridians belong to FWF. FWF members "make use" (T. 250) of the waters of Lake Okeechobee, the Kissimmee River and specifically of the waters in C-38. PROPOSED FINDINGS CONSIDERED The applicants and FWF filed post hearing memoranda and proposed recommended orders including proposed findings of fact which have been considered in preparation of the foregoing findings of fact. They have been adopted, in substance, for the most part. To the extent they have been rejected, they have been deemed unsupported by the weight of the evidence, immaterial, cumulative or subordinate.
Recommendation Upon consideration of the foregoing, it is RECOMMENDED: That SFWMD deny the pending application for surface water management permit. DONE and ENTERED this 29th day of November, 1983, in Tallahassee, Florida. ROBERT T. BENTON II, Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 29th day of November, 1983. COPIES FURNISHED: Dennis J. Powers, Esquire Gunster, Yoakley, Criser & Stewart 400 South County Road Palm Beach 33480 Terrell K. Arline, Esquire 325-C Clematis Street West Palm Beach, Florida 33401 Irene Kennedy Quincey, Esquire 3301 Gun Club Road West Palm Beach, Florida 33406 Charles P. Houston, Esquire 324 Datura Street, Suite 106 West Palm Beach, Florida 33401
The Issue Petitioners challenge the South Florida Water Management District’s (the District) proposed action to issue Individual Environmental Resource Permit (ERP) 50-06558-P to authorize conceptual approval of a surface water management (SWM) system to serve 1,919 acres of a phased, multiple-use development referred to as the Palm Beach County Biotechnolgy Research Park (BRP) and to authorize construction and operation of Phase 1A of that proposed project. The ultimate issue is whether the Applicants provided reasonable assurances that the proposed activities will not be harmful to the water resources of the District; will not be inconsistent with the overall objectives of the District; and will comply with the water quantity, environmental, and water quality criteria of the District’s ERP regulations, which are set forth in Part IV of Chapter 373, Florida Statutes, Florida Administrative Code Chapter 40E-4, et. seq.; and the Basis of Review for Environmental Resource Permit Applications Within the South Florida Water Management District – September 2003 (BOR).1
Findings Of Fact THE PARTIES The Florida Wildlife Federation, Audubon Society of the Everglades, and Jupiter Farms Environmental Council, Inc. (d/b/a Loxahatchee River Coalition) are not-for-profit corporations in existence prior to 2003 with more than 25 members in Palm Beach County. Palm Beach County Environmental Coalition was formed in 1997 and is a private, county-wide, non-profit citizen’s organization. Ms. Ketter, Mr. Bell, Ms. Larson, and Mr. Christensen are individuals affected by the proposed BRP. The Respondents stipulated that the parties who remained Petitioners after Mr. Silver’s withdrawal as a Petitioner have standing to bring this proceeding. The District, a public corporation existing by virtue of Chapter 25270, Laws of Florida, 1949, operates pursuant to Chapter 373, Florida Statutes, and Title 40E, Florida Administrative Code, as a multipurpose water management district with its principal office in West Palm Beach, Florida. The County is a duly-constituted governmental entity. THE PROJECT SITE AND ADJACENT LANDS The site of the project is generally referred to as the Mecca Farms, which is a contiguous tract of 1,919 acres of land. At present, the Mecca Farms is used for farming and mining operations. There presently exists a permitted, SWM system on the Mecca Farms that was first permitted in 1979, and has been modified from time to time since then. The existing SWM system includes 73 acres of ditches and a 272-acre above-ground impoundment area. The Mecca Farms site is located within the C-18 Basin. There are no jurisdictional wetlands or delineated surface waters on the Mecca Farms. The following, which is taken from the Staff Report (SFWMD Ex. 1), accurately describes the project site and its adjacent lands: The project site consists of 1,919 acres presently supporting an active orange grove with approximately 73 acres of associated drainage and irrigation ditches/canals and a 30-acre active sand mining operation. The ditches/canals are presently maintained at an elevation of approximately 17 feet NGVD.[3] These ditches/canals provide drainage conveyance to a 272-acre above- ground impoundment located in the northeast corner of the site utilizing four (4) 22,000 gpm pumps. The above-ground impoundment discharges to the west leg of the C-18 Canal via gravity discharge. Project site ditches and canals also connect directly to the C-18 Canal through an 18,000 gpm pump. An additional 224-acre agricultural area east of the 1,919 acres of orange groves is connected to and drains into the canal/ditch system on the project site. This adjacent area was leased from the adjacent land owner by the grove owner for use as row crops and was connected to the grove canal/ditch system for better control of drainage and irrigation. The area is no longer used for row crops. There is also a small area on the site that contains caretaker housing and an equipment maintenance building for the orange groves. These facilities were originally permitted in 1979 under Surface Water Management Permit No. 50-00689-S and subsequent modifications. The citrus grove and primary drainage facilities have been in existence since the 1960s. The Hungryland Slough is located north of the project site, separated from the project site by the C-18 Canal. This area is comprised primarily of publicly-owned natural areas, including an area referred to as Unit 11, which is owned in the majority by Palm Beach County. To the west is the J.W. Corbett Wildlife Management Area (CWMA) owned and managed by the Florida Fish and Wildlife Conservation Commission (FFWCC). To the east, a large area of low-intensity agricultural land exists under the ownership of Charles Vavrus and within the City of Palm Beach Gardens. These lands contain extensive wetlands that are adjacent to the Loxahatchee Slough to the east. The Acreage, a low-density residential area, is located directly to the south of the project site. The only access to the site at this time is an unpaved extension of Seminole Pratt-Whitney Road (SPW), connecting the site at its southwestern corner to the Acreage. THE PROPOSED PROJECT The subject application is for conceptual approval of the SWM system for the BRP and for construction and operation of Phase 1A of the project. All of the proposed Phase 1A construction will occur on the Mecca Farms site. The following, taken from the Staff Report, accurately describes the proposed project: The [BRP] is a phased multiple use development planned for approximately 1,919 acres and will consist of land uses related to science and technology, biotechnology, biomedical, and other related research and development industries and manufacturing. Additionally, proposed support and complementary land uses include educational, institutional, residential, commercial, and recreational facilities, along with utilities and a large created natural area. THE PROPOSED SWM SYSTEM The proposed SWM system will consist of several interconnected lakes that will provide wet detention for storm water runoff from the property site and from 39 acres of off- site flows from SPW Road and a proposed Florida Power and Light (FPL) Substation. The lakes will collect, store, and treat the runoff. The storm water will pass through the lakes, through a 247-acre area referred to as the “Natural Area” (which will be created as part of the mitigation plan), and discharged to the C-18 Canal. To provide additional water quality treatment, these lakes will include planted littoral zones and the southern lake will include a filter marsh. The Natural Area will, in subsequent construction phases, be constructed on the western boundary of the Mecca site with discharge to the C-18 canal, which is adjacent to the northern boundary of the Mecca Farms. The southern boundary of the Natural Area will be the north boundary of the lake that is to be constructed on the southern end of the property. This is the area that is available for use as a flow-way (which will be discussed in greater detail in a subsequent section of this Recommended Order). The Natural Area will be a wetland type system that will move water slowly through that system providing additional storage and water quality benefits prior to discharging through a gravity control structure into the C-18 Canal. The C-18 Canal discharges to either the Northwest or Southwest Fork of the Loxahatchee River, depending on how structures are operated downstream. Discharges travel in the C-18 Canal for approximately nine miles before reaching the Loxahatchee River. The existing SWM system for the Mecca Farms currently discharges to the C-18 Canal, as will the proposed SWM system. The proposed project will not discharge to the CWMA or the Hungryland Slough. The Grassy Waters Preserve and the Loxahatchee Slough are several miles from the project site and will not be affected by the project’s proposed activities. The following, which is taken from the Staff Report, accurately describes the proposed SWM system. The proposed conceptual surface water management system which will serve the 1,919-acre site will consist of site grading, storm water inlets and culverts which will direct all runoff to a series of interconnected lakes for water quality treatment and attenuation of the peak runoff rate. Pumps will control the runoff rate from the developed site into the adjacent onsite BRP natural area. The BRP natural area will discharge into the C-18 canal via a gravity control structure. The system has been designed to accommodate 39 acres of off-site flows from SPW [Road] and a proposed Florida Power and Light (FPL) Substation. The existing control elevation of the citrus grove is 17.0’ NGVD. The proposed control elevations are 18.0’ NGVD for the developed area and 19.0’ NGVD for the natural area. The control elevations are being raised to provide a “step down” of water elevations from wetlands to the north, west and east of the site (20.5’ to 21.0’) to lower elevations to the south (17.0’). PHASE 1A CONSTRUCTION The following, which is taken from the Staff Report, accurately describes the proposed Phase 1A construction: The Phase 1A construction activities will allow the applicant to proceed with lake excavation, clearing and site grading of 536 acres in the southern portion of the site. No permanent buildings or parking areas are proposed at this time. Stormwater from Phase 1A and the remainder of the site, to remain in agricultural use, will be treated in the Phase 1A lakes and then pumped into the existing impoundment for additional water quality treatment and attenuation prior to discharging to the west leg of the C-18 Canal via the existing weir structures. The existing 18,000 gpm pump that connects the on-site ditches and canals directly to the C-18 Canal will remain, but will only be used if the impoundment is full. (See Special Condition No. 21). Approval of Phase 1A authorizes the use of the existing, previously permitted surface water management facilities, therefore, the previous permit no. 50-00689-S is superceded by this permit. The 224 acre agricultural area east of the existing grove that is connected to the grove canal/ditch system will be severed as part of Phase 1A. The pipe connecting this area will be removed and portions of the berm around this area will be regraded so the area will sheetflow into the adjacent pasture land’s canal/ditch system as it did previously [sic] to being connected to the grove system. Of the 536 acres involved in the Phase 1A construction, 87 acres will become lake bottom and 449 acres will remain pervious area, subject only to grading. CONCEPTUAL APPROVAL Pertinent to this proceeding, Florida Administrative Code Rule 40E-4.021(5) defines the term “conceptual approval” to mean an ERP issued by the District which approves a conceptual master plan for a surface water management system or a mitigation bank. Florida Administrative Code Rule 40E-4.305, pertains to conceptual approvals and provides, in relevant part, as follows: Conceptual approvals constitute final District action and are binding to the extent that adequate data has been submitted for review by the applicant during the review process. A conceptual approval does not authorize construction, alteration, operation, maintenance, removal, or abandonment of a surface water management system or the establishment and operation of a mitigation bank. * * * For phased projects, the approval process must begin with an application for a conceptual approval which shall be the first permit issued for the project. An application for construction authorization of the first phase(s) may also be included as a part of the initial application. As the permittee desires to construct additional phases, new applications shall be processed as individual or standard general environmental resource permit applications pursuant to the conceptual approval. The conceptual approval, individual and standard general permits shall be modified in accordance with conditions contained in Chapters 40E-4 and 40E-40, F.A.C. Issuance of a conceptual approval permit pursuant to Chapter 40E-4, F.A.C., shall not relieve the applicant of any requirements for obtaining a permit to construct, alter, operate, maintain, remove, or abandon a surface water management system or establish or operate a mitigation bank, nor shall the conceptual approval permit applicant be relieved of the District’s informational requirements or the need to meet the standards of issuance of permits pursuant to Chapters 40E-4 or 40E-40, F.A.C. . . . PERMITTING CRITERIA In order to obtain an ERP, an applicant must satisfy the conditions for issuance set forth in Florida Administrative Code Rules 40E-4.301 and 40E-4.302. The conditions for issuance focus on water quantity criteria, environmental criteria, and water quality criteria. Florida Administrative Code Rule 40E-4.301 contains the following permitting conditions applicable to this proceeding: In order to obtain a standard general, individual, or conceptual approval permit ... an applicant must provide reasonable assurance that the construction, alteration, operation, maintenance, removal, or abandonment of a surface water management system: will not cause adverse water quantity impacts to receiving waters and adjacent lands; will not cause adverse flooding to on-site or off-site property; will not cause adverse impacts to existing surface water storage and conveyance capabilities; will not adversely impact the value of functions provided to fish and wildlife and listed species by wetlands and other surface waters; will not adversely affect the quality of receiving waters ...; will not cause adverse secondary impacts to the water resources; will not adversely impact the maintenance of surface or ground water levels or surface water flows ...; will not cause adverse impacts to a work of the District ...; will be capable, based on generally accepted engineering and scientific principles, of being performed and of functioning as proposed; will be conducted by an entity with the sufficient financial, legal and administrative capability to ensure that the activity will be undertaken in accordance with the terms and conditions of the permit, if issued; and will comply with any applicable special basin or geographic area criteria established in Chapter 40E-41 F.A.C. Florida Administrative Code Rule 40E-4.302 provides the following Additional Conditions for Issuance of Permits applicable to this proceeding: In addition to the conditions set forth in section 40E-4.301, F.A.C., in order to obtain a standard general, individual, or conceptual approval permit under this chapter or Chapter 40E-40, F.A.C., an applicant must provide reasonable assurance that the construction, alteration, operation, maintenance, removal, and abandonment of a system: Located in, on, or over wetlands or other surface waters will not be contrary to the public interest, or if such an activity significantly degrades or is within an Outstanding Florida Water, that the activity will be clearly in the public interest, as determined by balancing the following criteria as set forth in subsections 4.2.3 through 4.2.3.7 of the Basis of Review for Environmental Resource Permit Applications Within the South Florida Water Management District: Whether the activity will adversely affect the public health, safety or welfare or the property of others; Whether the activity will adversely affect the conservation of fish and wildlife, including endangered or threatened species, or their habitats; Whether the activity will adversely affect navigation or the flow of water or cause harmful erosion or shoaling; Whether the activity will adversely affect the fishing or recreational values or marine productivity in the vicinity of the activity; Whether the activity will be of a temporary or permanent nature; Whether the activity will adversely affect or will enhance significant historical and archaeological resources under the provisions of Section 267.061, F.S.; and The current condition and relative value of functions being performed by areas affected by the proposed activity. Will not cause unacceptable cumulative impacts upon wetlands and other surface waters as set forth in subsections 4.2.8 through 4.2.8.2 of the Basis of Review. . . . THE BASIS OF REVIEW The District has adopted the BOR and incorporated it by reference by Florida Administrative Code Rule 40E- 4.091(1)(a). The standards and criteria found in the BOR are used to determine whether an applicant has given reasonable assurances that the conditions for issuance of an ERP have been satisfied. Section 1.3 of the BOR provides, in part, as follows: . . . Compliance with the criteria established herein [the BOR] constitutes a presumption that the project proposal is in conformance with the conditions for issuance set forth in Rules 40E-4.301 and 40E-4.302, F.A.C. WATER QUANTITY The term “control elevation” describes the level of freshwater water bodies established by a SWM system. The existing SWM system has a control elevation of 17’ NGVD. The control elevation for the proposed lake system will be raised to 18’ NGVD, and the control elevation for the proposed Natural Area will be raised to 19’ NGVD. Raising the control elevations will permit more treatment of storm water prior to discharge and will permit a more controlled discharge. In addition, raising the control elevation will lessen seepage onto the project site from adjacent wetlands. The Applicants provided reasonable assurances that the proposed project will not cause adverse water quantity impacts to receiving waters and adjacent lands, thereby satisfying the criteria set forth in Florida Administrative Code Rule 40E- 4.301(a). The Applicants provided reasonable assurances that the proposed project will not cause adverse flooding to on-site or off-site property, thereby satisfying the criteria set forth in Florida Administrative Code Rule 40E-4.301(b). The Applicants provided reasonable assurances that the proposed project will not cause adverse impacts to existing surface water storage and conveyance capabilities, thereby satisfying the criteria set forth in Florida Administrative Code Rule 40E-4.301(c). VALUE OF FUNCTIONS OF WETLANDS AND SURFACE WATERS Florida Administrative Code Rule 40E-4.301(d), requires the Applicants to establish that “. . . the construction, alteration, operation, maintenance, removal, or abandonment of a surface water management system . . .” “. . . will not adversely impact the value of functions provided to fish and wildlife and listed species by wetlands and other surface waters.” The District established that the term “value of functions,” as used in the rule, refers to habitat and life support functions. Because there are no wetlands or delineated surface waters on the Mecca Farms site, there are no direct adverse impacts to the functions that wetlands provide to fish and wildlife. The Applicants have provided reasonable assurances to demonstrate that the value of functions provided to fish and wildlife and listed species by wetlands and other surface waters will not be adversely affected. The existing project site does not contain nesting areas for wetland-dependent endangered or threatened wildlife species or species of special concern. The potential for use of the existing project site for nesting by such species is minimal. The existing project site does contain habitat for the American Alligator and foraging habitat for wading birds and birds of prey. The primary foraging habitat on the existing site is around the perimeter of the existing 272-acre impoundment area in the northeast portion of the site. The existing impoundment will be replaced by on-site storm water treatment lakes and the BRP Natural Area that will have shallow banks planted with wetland plant species common to the area. Wildlife is opportunistic; and wading birds commonly feed in areas where there is water, wetland vegetation and wetland plants. The end result will be that the proposed project will have more and better foraging habitat acreage than the existing site. The Natural Area will provide a wetland buffer between the developed area and CWMA that will prevent any adverse impacts both to the wetlands and other surface waters in CWMA and to the value of the functions those wetlands and other surface waters provide to fish, wildlife, and listed species. The Natural Area will provide a wetland buffer between the developed area and Unit 11 that will prevent any adverse impacts both to the wetlands and other surface waters in Unit 11 and to the value of the functions those wetlands and other surface waters provide to fish, wildlife, and listed species. There was no competent evidence that the proposed project would impact the ability of the Florida Fish and Wildlife Conservation Commission to manage the CWMA through control burns or otherwise, thereby adversely affecting the diversity or abundance of fish and wildlife (including endangered species and their habitats). Petitioners attempted to raise the issue of mosquito control in their Petitions and at the Final Hearing. The allegations pertaining to mosquito control were struck by the District and Special Condition Number 26 was added before the Petitions were referred to DOAH. Petitioners made no attempt to amend their Petitions and have not challenged Special Condition 26. The Addendum to Staff Report (SFWMD Ex. 2) contains the following Special Condition Number 26: “Upon submittal of an application for construction of any buildings, the permittee shall submit a mosquito control plan for review and approval by District Staff.” Since there will be no buildings containing people or other facilities which would encourage the use of mosquito spraying, it is appropriate for the mosquito control condition to apply to only future phases of construction. There was no competent evidence of impacts attributable to pesticides associated with the application for the SWM system or for Phase 1A construction and operation that would adversely affect the diversity or abundance of fish and wildlife including endangered species and their habitats. The Applicants have satisfied the criteria set forth in Florida Administrative Code Rule 40E-4.301(d). WATER QUALITY The primary concern during Phase 1A construction will be erosion control. Best Management Practices (“BMPs”) are operational and design elements used to either eliminate or reduce the amount of pollutants at the source so they do not get into a SWM system or move downstream. To contain erosion in Phase 1A, the Applicants will use the following BMPs: Silt screens and turbidity barriers within existing ditches and around the perimeter of property. Planned construction sequencing to reduce movement and stock piling of material; Slope stabilization and seeding or sodding of graded areas; and Containment of construction materials with berms. All erosion and turbidity control measures will remain in place until the completion of the on-site construction and approval by the District’s post-permit compliance staff. The Applicants provided reasonable assurances that the proposed Phase 1A construction activities will not adversely impact the quality of receiving waters and that those activities will not violate State water quality standards. Section 5.2.1, BOR, requires that a SWM system provide wet detention for the first one inch of runoff. The proposed SWM system will provide wet detention for one and one-half inches of runoff. The Applicants provided reasonable assurances to demonstrate that the technical criteria in the BOR will be met. Under Section 1.3 of the BOR, compliance with the criteria in the BOR constitutes a presumption that the Proposed Project is in conformance with the conditions for issuance. This presumption was not rebutted by the Petitioners. The lake system will include planted littoral zones to provide additional uptake of pollutants. A filter marsh is also included in the southern lake. All of the storm water runoff from the lakes will pass through the filter marsh, which will be planted with wetland plants. The filter marsh will provide additional polishing of pollutants, uptake, and filtering through the plants. The discharge will then go into the BRP, which will provide the discharge additional uptake and filtering. BMPs utilized during the Operations and Maintenance phase will include regular maintenance inspections and cleaning of the SWM system, street-sweeping, litter control programs, roadway maintenance inspections and repair schedule, municipal waste collection, pollution prevention education programs, pesticides, herbicides and fertilizer storage, and application training and education. The littoral zones, filter marsh, BRP natural area, and BMPs were not included in the water quality calculations and are over and above rule requirements. The Applicants provided reasonable assurances to demonstrate that the proposed project will not adversely affect the quality of receiving waters. Therefore, Rule 40E- 4.301(1)(e), F.A.C., will be satisfied and water quality standards will not be violated. HAZARDOUS SUBSTANCES Pursuant to Section 5.5.5 of the BOR, commercial or industrial zoned projects shall provide at least one-half inch of dry detention or retention pretreatment as part of the required retention/detention, unless reasonable assurances can be offered that hazardous materials will not enter the project's SWM system. The Addendum to Staff Report reflects the following Special Condition 25 pertaining to hazardous materials: Upon submittal of an application for construction of commercial or industrial uses the permittee shall submit a plan that provides reasonable assurances that hazardous materials will not enter the surface water management system pursuant to the requirements of section 5.2.2(a) of the Basis of Review. Applicable permitting criteria does not require the Applicants to present a hazardous substances plan at this point because no facilities that will contain hazardous materials are part of the Phase 1A construction. SECONDARY IMPACTS Florida Administrative Code Rule 40E-4.301(1)(f) and Section 4.1.1(f) of the BOR, require an applicant to provide reasonable assurances that the proposed activities will not cause adverse secondary impacts to the water resources. A secondary impact is an indirect effect of a project resulting in adverse effects to wetlands or other surface waters. The District considers those adverse effects that would not occur "but for" the activities that are closely linked and causally related to the activity under review. This standard is discussed further in the Conclusions of Law section of this Recommended Order. The County’s Exhibit 3 is a secondary impact analysis identifying the secondary impacts that may potentially result from the proposed project. These impacts are: 1) the widening of SPW Road; 2) the construction of an FPL substation; 3) the extension of PGA Boulevard; and 4) the potential relocation of a runway at North County Airport. The secondary impact analysis performed pursuant to the Uniform Mitigation Assessment Method (UMAM) contained in Florida Administrative Code Chapter 62-345 reflects that up to 153.3 acres of wetlands may be partially or completely impacted by these secondary impacts, resulting in approximately 71.21 units of functional loss. Where future activities are expected to directly impact wetlands, secondary impacts were assessed based on the loss of all current functional value within the direct footprint of that activity. Additionally, an assessment was conducted to determine the degree of partial functional loss where impacts beyond the footprint of these activities are anticipated. SPW Road is an existing dirt road which is in the County's five-year road plan to widen as a four-lane paved road. Because the widening of the existing dirt road to a four-lane paved road is part of the five-year road plan, the impacts of that widening are not attributable to the subject project. However, as part of the proposed project, it is proposed to widen SPW Road to a six-lane paved road. The additional impacts associated with the widening from four to six lanes will be caused by, and are linked to, the proposed project. These impacts amount to approximately 2.2 acres. The FPL substation, which is proposed to service the proposed project, may result in 1.6 acres of potential direct impacts to wetlands. In addition, 1.0 acre of potential indirect secondary impacts may occur to wetlands that are not going to be dredged and filled. Those indirect secondary impacts may have some adverse impact on the functional value to those wetlands for wildlife utilization. The extension of PGA Boulevard to the Mecca Farms site has the potential to result in 45.6 acres of direct impacts to wetlands and 56.6 acres of indirect secondary wetland impacts which will not be dredged or filled, but will be in close proximity to the road. The secondary impact assessment for PGA Boulevard assumed the incorporation of wildlife crossings to minimize habitat fragmentation. If the airport runway needs to be shifted, potential direct wetland impacts to an additional 22.7 acres may occur. Indirect impacts to 23.6 acres of wetlands in close proximity could also occur. Runway relocation may or may not be necessary due to the PGA Boulevard extension; however, the analysis assumed the need for the relocation. Each of the projects listed above as potential secondary impacts will require a separate construction and operation permit from the District. The issuance of this permit does not in any way guarantee the issuance of permits for any of these identified potential secondary impacts. MITIGATION PLAN The Applicants provided a conceptual mitigation plan using UMAM to demonstrate how potential secondary impacts could be offset. Mitigation options have the potential to provide more than twice the functional gain than the functional loss from the identified secondary impacts. The conceptual mitigation options include: 194 acres of the land that had been acquired for future mitigation needs in Unit 11. 227 acres of the BRP natural area. 32.6 acres in the southern lake wetland along with proposed upland habitat. Sufficient mitigation is available in these options to offset the potential secondary impacts. The mitigation for the four potential secondary impacts is not required to be implemented now because the impacts are not occurring now. Section 4.2.7 of the BOR requires that the District consider those future impacts now and that a conceptual mitigation plan be provided to demonstrate and provide reasonable assurances that those impacts, in fact, can be offset in the future. The Governor and Cabinet sitting as the Board of Trustees considered and approved a request for public easement of approximately 30 acres to use a portion of CWMA for SPW Road, an FPL substation, and the land area that may be needed by District in the future for the connection to the flow-way. As consideration in exchange for the public easement over 30 acres, the County will transfer fee simple title of 60 acres to the State. This public easement also provides a benefit for CERP as it includes the small portion that the District is going to need for its future CERP project to connect to the flow-way on the proposed project site. The Applicants provided reasonable assurances that mitigation will offset secondary impacts to wetlands and other surface waters. UNIDENTIFIED SECONDARY IMPACTS Testimony at the final hearing raised a question as to whether there is nesting or roosting by listed wading bird species in adjacent off-site wetlands outside the eastern boundary of the project site. Evidence was inconclusive on nesting or roosting in these areas. Because the status of adjacent listed wading bird nesting or roosting is uncertain, the District suggested in its Proposed Recommended Order that a special condition requiring a wildlife survey prior to construction near the eastern project boundary be added to the permit as follows: Prior to application for construction within 1000 feet of the eastern boundary of the above-ground impoundment, the applicant shall conduct a wildlife survey to identify any nesting or roosting areas in the adjoining off-site wetlands utilized by listed species of wading birds. If such nesting or roosting areas are found the permittee shall, if determined necessary by the District, incorporate additional buffers or other appropriate measures to ensure protection of these wetland functions. The District represented in its Proposed Recommended Order that the County has no objection to adding the foregoing condition. CUMULATIVE IMPACTS Pursuant to Section 373.414(8), Florida Statutes, the District is required to consider cumulative impacts upon wetlands and other surface waters delineated in Section 373.421(1), Florida Statutes, within the same drainage basin. Cumulative impacts are the summation of unmitigated wetland impacts within a drainage basin. The cumulative impact analysis is geographically based upon the drainage basins described in Figure 4.2.8-1 of the BOR. Cumulative impacts are unacceptable when they would result in unacceptable adverse impacts to the functions of wetlands and surface waters within a drainage basin. There are no wetlands or other surface waters delineated pursuant to Section 373.421(1), Florida Statutes, on the Mecca Farms site. Therefore, no cumulative impacts are created by the direct impacts of the project. Cumulative impacts may be created by a project's secondary impacts. If a wetland impact has been appropriately mitigated on-site within the drainage basin, there is no residual impact, and therefore no cumulative impact. The PGA Boulevard extension, a portion of the SPW Road widening, and the airport runway relocation are located within the C-18 Basin. The proposed mitigation options are all located in the C-18 Basin and will offset those impacts. Those potential secondary impacts are considered to meet the cumulative impact requirements of Section 373.414(8), Florida Statutes. The Applicants provided reasonable assurances that the proposed project will not result in cumulative impacts to the C-18 Basin. The FPL substation is located within the L-8 Drainage Basin. The majority of the SPW Road expansion is located within the C-18 Basin, but a portion is located on the basin line between the C-18 Basin and the L-8 Basin. Because the mitigation for the L-8 impacts are proposed in a different basin, the Applicants were required to conduct a cumulative impact analysis for the L-8 Basin impacts. Based on the Florida Land Use Cover Classification System, there are 43,457 acres of freshwater wetlands within the L-8 Basin. Approximately 41,000 acres of the wetlands in L-8 Basin are in public ownership. This total constitutes approximately 95 percent of all the wetlands in the L-8 Basin. Public ownership of these wetlands provide a high level of assurance that these lands will be protected in perpetuity. The Respondents established that proposed mitigation can fully offset the potential impacts from the SPW Road expansion and the FPL substation and the approximately four acres of impacted wetlands in the L-8 Basin. The Applicants provided reasonable assurances that there are no unacceptable adverse cumulative impacts on the L-8 Basin.4 GROUND WATER FLOWS, SURFACE WATER FLOWS, AND MINIMUM FLOWS AND LEVELS Florida Administrative Code Rule 40E-4.301(1)(g) requires an applicant to provide reasonable assurances that the proposed activity will not adversely impact the maintenance of surface or ground water levels or surface water flows established pursuant to Section 373.042, Florida Statutes. The term "maintenance of surface and groundwater levels or surface water flows" in Florida Administrative Code Rule 40E-4.301(1)(g) means that a project will not adversely impact the maintenance of surface water flows that contribute to meeting the minimum flow for the water body. An adverse impact to the maintenance of surface or groundwater levels or surface water flows may occur when a project discharging to a water body with a designated minimum flow level is proposed to be diverted. An analysis was done to compare the peak discharge rate from the existing SWM system on the Mecca Farms site with the projected peak discharge rate from the proposed SWM system. The analysis showed that the peak discharge rate under the proposed system will be less than that of the existing system. That result was expected since the proposed system will have higher control elevations, which, as noted above, will provide better treatment and permit a better control of the discharge into the C-18 Canal. Under the existing SWM system, storm event water in a dry period is frequently stored in the existing impoundment for future irrigation purposes. Under the proposed SWM system such storm event water will be discharged downstream, which will benefit those downstream areas during dry periods. The proposed system will also provide better control over pulse discharges during heavy storm events. The Applicants provided reasonable assurances that the proposed activities will not adversely impact the maintenance of surface or ground levels or surface water flows as required by Florida Administrative Code Rule 40E-4.301(1)(g). THE DISTRICT’S OBJECTIVES Sections 373.414 and 373.416, Florida Statutes, require an applicant to provide reasonable assurances that a regulated activity will not be harmful to the water resources and will not be inconsistent with the overall objectives of the District. Congress initially authorized the Central and Southern Florida (“C&SF”) Project in 1948. Thereafter extensive work was undertaken pertaining to flood control; water supply for municipal, industrial, and agricultural uses; prevention of saltwater intrusion; and protection of fish and wildlife. The work included construction of a primary system of 1000 miles each of levees and canals, 150 water-control structures, and 16 major pump stations. Unintended consequences of the C&SF Project have included the irreversible loss of vast areas of wetlands, including half of the original Everglades; the alteration in the water storage, timing, and flow capacities of natural drainage systems; and the degradation of water quality and habitat due to over-drainage or extreme fluctuations in the timing and delivery of fresh water into the coastal wetlands and estuaries. In 1992, Congress authorized the C&SF Project Comprehensive Review Study, which is generally referred to as the “Restudy.” The objective of the Restudy was to reexamine the C&SF Project to determine the feasibility of modifying the project to restore the South Florida ecosystem and provide for the other water-related needs of the region, such as water supply and flood protection. In April 1999, the U.S. Army Corps of Engineers issued the Central and Southern Florida Project Comprehensive Review Study Final Integrated Feasibility Report and Programmatic Environmental Impact Statement (“Restudy Report”). The Restudy Report recommends a comprehensive plan for the restoration, protection, and preservation of the water resources of Central and South Florida. The resulting plan is known as CERP. The North Palm Beach County Part I project, which includes restoration of the Northwest Fork of the Loxahatchee River (“NWFLR”), is a component of CERP. The successful completion of CERP and the successful restoration of the NWFLR are high-priority objectives of the District. The Loxahatchee River is an important feature of the South Florida ecosystem, nationally and internationally unique, and an important natural and economic resource. Rules pertaining to MFL for the NWFLR and for the recovery of the NWFLR are found at Florida Administrative Code Rule 40E-8.011; 40E-8.221(4); and 40E-8.421. Recovery goals, which are not presently being met, have been established; and strategies to meet those goals have been identified. The Mecca Farms site is located within the boundaries of the CERP North Palm Beach County Part I project and has the potential to affect CERP and the restoration of the NWFLR. Projects that potentially would affect or would be within or adjacent to a CERP project are evaluated on a case-by- case basis to determine whether a proposed project would not be inconsistent with CERP and other District objectives. There was a dispute between Respondents and Petitioners as to whether the proposed project was inconsistent with the District’s objectives, including CERP and its goals pertaining to the restoration of the NWFLR. Petitioners contend that the District has insufficient evidence that the Mecca Farms will not be needed for the construction of a reservoir. That contention is rejected. The greater weight of the credible evidence established that sufficient storage is available at a superior site known as the Palm Beach Aggregates (PBA) site in the L-8 Basin, which is a unique geological site that will provide in-ground storage of water.5 Water from the PBA storage site can be conveyed to the NWFLR to increase dry season flows. Water can be stored at the PBA site in the wet season to prevent potentially damaging high flows. The L-8 Basin, which is adjacent to the C-18 Basin, receives more water during the wet season than it uses. This means that at present a significant amount of water must be discharged to tide (lost) during the wet season to provide for flood protection in this area. As envisioned, the water currently lost to tide could be stored at the PBA site for use during the dry season. By combining the water storage in the L-8 Basin with connective flow-ways to the C-18 Canal, water demands within the C-18 Basin, including the NWFLR, can also be met by the PBA storage site.6 An increase in freshwater flows to the NWFLR will further the District’s restoration goals for the NWFLR. Storage at PBA has regional benefits for other significant natural areas because it will provide additional flows to the Loxahatchee Slough and Grassy Waters Preserve. Those additional flows will further the District’s CERP goals. Since October of 2003, County staff and the District’s ERP staff have coordinated review of the subject project with the District’s CERP Planning and Federal Projects Division and other District staff working on projects in this region. The County asked the District to determine if the Mecca Farms’ site could in some way accommodate CERP objectives, and three alternatives were considered: 1) no action; 2) a reservoir; and 3) a flow-way. As opposed to a reservoir, the more valuable and the more practical, use of the Mecca Farms site would be as part of the system to convey the stored water to the areas that would most benefit from its discharge. The proposed flow-way in the BRP Natural Area would be an integral part of that conveyance system and would provide the District with greater flexibility in managing and directing the discharge of the water stored at the PBA site. Prior to the development of the flow-way concept as part of the proposed development, CERP identified a single route to take water from PBA to the NWFLR. The flow-way will provide an additional route from PBA to the NWFLR. That additional route will provide the District with greater operational flexibility. The flow-way will complement the L-8 Basin flow- way and help reduce peak flows to the NWFLR and the Estuary. The flow-way also provides a potential route allowing excess water to be brought back from the C-18 Basin to the PBA site for storage. There are no other potential routes that allow water to be directed from the C-18 Basin in the wet season to the PBA site. The flow-way provides a feature that was not part of the CERP original plan and is therefore an unanticipated benefit for CERP. The Applicants provided reasonable assurances that the proposed project is not inconsistent with the District’s objectives.7
Recommendation Based on the foregoing findings of fact and conclusions of Law, it is RECOMMENDED that the District issue the subject ERP for the conceptual approval of the SWM system for the BRP and the Phase 1A construction and operation subject to the general and special conditions set forth in the Staff Report and the Amended Staff Report. It is further RECOMMENDED that the District add the following special condition: Prior to application for construction within 1000 feet of the eastern boundary of the above-ground impoundment, the applicants shall conduct a wildlife survey to identify any nesting or roosting areas in the adjoining off-site wetlands utilized by listed species of wading birds. If such nesting or roosting areas are found the permittee shall, if determined necessary by the District, incorporate additional buffers or other appropriate measures to ensure protection of these wetland functions. DONE AND ENTERED this 3rd day of December, 2004, in Tallahassee, Leon County, Florida. S CLAUDE B. ARRINGTON Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 3rd day of December, 2004.