A. WAYNE LUJAN vs DEPARTMENT OF ECONOMIC OPPORTUNITY AND DEPARTMENT OF ENVIRONMENTAL PROTECTION, 20-000663 (2020)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Feb. 06, 2020 Number: 20-000663 Latest Update: Jul. 04, 2024

The Issue The issue to be decided in these cases is whether Petitioner, A. Wayne Lujan (Petitioner), was entitled to issuance of five environmental resource permits (ERPs) that Respondent, Department of Environmental Protection (DEP), intended to deny as stated in notices of denial dated October 25, 2019.

Findings Of Fact The following Findings of Fact are based on the stipulations of the parties and the evidence adduced at the final hearing. Parties and Background Petitioner Lujan is the president and a director of Kay Haven Associated Enterprises, Inc. (Key Haven), that owns the five parcels, which are the subject matter of this hearing. Although Key Haven owns numerous lots, it chose to submit ERP applications for the Subject Lots within the Key Haven Tenth Addition plat dated September 1966 (Plat). See Joint Exhibit 84. Joint Exhibit 84 The Subject Lots are located in an unincorporated part of the County on the northwestern edge of a body of land lying north of State Road A1A, identified on the Plat as Raccoon Key. The Subject Lots are approximately half a mile east of the city limits of Key West, Florida. The Subject Lots are all characterized by a small upland portion adjacent to Floral Avenue. The majority of the Subject Lots transition into a mangrove fringe of varying depth and submerged lands containing marine seagrasses and sponges. See Joint Exhibits 81 and 82. Joint Exhibit 81 Joint Exhibit 82 DEP is the administrative agency of the state having the power and duty to protect Florida's air and water resources, and to administer and enforce the provisions of part II of chapter 380, part IV of chapter 373, and chapter 403, Florida Statutes. DEP also administers the provisions of Florida Administrative Code chapters 62-312 and 62-330 regarding activities in wetlands and other surface waters of the state. DEO is the state land planning agency and reviews certain permit applications for consistency with its statutory responsibilities under the Florida Coastal Management Program (FCMP), which includes part II of chapter 163, and part I of chapter 380, Florida Statutes. Relevant to this proceeding, DEO exercises authority over the ACSC program. See § 380.05, Fla. Stat. On July 26, 2018, Petitioner filed five applications for ERPs with DEP. Although certain details within each application differed, the applications all sought to authorize construction of a seawall in the waters of the Gulf of Mexico and in unnamed wetlands within the landward extent of the Gulf of Mexico, a Class III OFW, to remove the entirety of the existing mangrove fringe, and to place fill within wetlands and other surface waters for the construction of single-family residences (Project). The minor differences in each application relate to the length of the seawall and the amount of fill necessary for each lot. Although some testimony was provided concerning the differences, no party argued that the differences were material to the determinations necessary in this proceeding. Accordingly, the factual and legal analysis for the Subject Lots and ERP applications were addressed without distinction herein. DEP forwarded a copy of the applications to DEO for its recommendation. On August 24, 2018, DEO issued objections to approval of the permits citing inconsistency with the Florida Keys ACSC Principles for Guiding Development (PGDs) in section 380.0552(7). DEO also objected based on inconsistencies between the Project and the Monroe County Comprehensive Plan (Comp Plan) and Land Development Code (LDC), which implement the PGDs. DEP's first RAI dated August 24, 2018, included DEO's objections. The first RAI notified Petitioner that DEP had concerns with the Project that included: (1) installation of the vertical seawall; (2) placement of fill within an OFW; (3) direct impacts to marine seagrass bed community without adequate mitigation; and (4) failure to provide stormwater management plans since the Project was a common plan of development. The first RAI contained 19 specific requests for additional information. On October 23, 2018, Petitioner responded to DEP's first RAI by submitting slightly revised plans. The revised Project proposed less of a vertical seawall footprint by adding rip-rap to the side seawalls as a means of containing fill. Petitioner's responses to the 19 specific requests for information can generally be categorized as follows: (1) elimination of some vertical seawalls, but not the ones on the waterward edge of the Subject Lots; (2) no change in the placement of fill; (3) Petitioner would attempt to find appropriate compensatory mitigation for the seagrass impacts; and (4) Petitioner did not consider the Project to be a common plan of development. Regarding DEO's objections, Petitioner stated that "[w]e acknowledge that the project has been forwarded to FWC [Florida Fish and Wildlife Conservation Commission] and DEO and that additional comments and information may be requested by those agencies in order to fully evaluate the application." Petitioner did not substantively address DEO's objections. DEP issued a second RAI on November 21, 2018. DEO again objected in a letter dated November 26, 2018. DEP's second RAI raised the same concerns as the first RAI and acknowledged that four of the 19 specific items were adequately addressed. On January 11, 2019, Petitioner responded to DEP's second RAI by again submitting slightly revised site plans. However, the Project remained generally unchanged, with a proposed vertical seawall on the waterward edge of the lots, rip-rap along the sides, removal of the entire mangrove fringe, and fill of the entire lots eliminating the existing marine seagrasses. DEP issued a third RAI to Petitioner on February 8, 2019. DEO reiterated its objections by letter dated February 8, 2019. The third RAI raised the same concerns as the first and second RAIs, although DEP acknowledged that six of the 19 specific items were adequately addressed. By letter dated April 8, 2019, Petitioner responded to DEP's third RAI. The response again proposed slightly altered site plans from the January 2019 submissions. Petitioner essentially stated that mitigation opportunities were scarce, but had contacted the County and was looking into derelict vessel removal. However, the proposed Project remained generally unchanged, with a proposed vertical seawall on the waterward edge of the lots, rip-rap along the sides, removal of the entire mangrove fringe, and fill of the entire lots eliminating the existing marine seagrasses. As it relates to DEO's objections, Petitioner responded that "[a]fter review of the comments outlined in the [DEO] revised letter, it seems that the DEO objections are related to compliance with the provision[s] of the [Monroe] County [Comp Plan]. We will deal with those issues at the time of local permitting." Petitioner again failed to substantively address DEO's objections. DEP issued its final RAI on May 8, 2019. DEO again objected by letter dated May 6, 2019. This final RAI raised the same concerns as the first, second, and third RAIs. DEP stated that seven of the 19 specific items were not addressed by Petitioner, and that failure to provide a complete response to the prior RAI may result in denial of the ERP applications. On August 29, 2019, Petitioner responded to DEP's final RAI by once again submitting slightly revised plans, and additional information concerning mitigation proposals. However, the Project did not change and Petitioner again failed to substantively address DEO's objections. DEO’s objection letter identified that the ERP applications were inconsistent with the Florida Keys ACSC PGDs, seven Comp Plan policies, and six regulatory provisions of the County's LDC. DEP denied the ERP applications on October 25, 2019. The grounds for denial reiterated the issues not addressed by Petitioner's RAI responses. Specifically: (1) the failure of the Project to provide reasonable assurances concerning direct, secondary, and cumulative impacts to the marine seagrass bed community; (2) continued reliance upon construction of a vertical seawall; (3) failure to provide stormwater management information necessary given the determination that the Project constituted a common plan of development; (4) inconsistency with the FCMP as identified by DEO in its objection letters; and (5) failure to provide reasonable assurances that the Project was clearly in the public interest. Direct Impacts The Project proposed to entirely fill the Subject Lots, contain the fill with vertical seawalls and rip-rap, and construct pile-supported single-family residences. The Project would remove the entire mangrove fringe that aerials and site inspections show is a healthy mix of red, black, and white mangroves along with some green buttonwood. The shallow, open surface waters are dominated by marine seagrasses that vary in density. Petitioner did not make any design modifications to the Project that sought to reduce or eliminate direct impacts to the mangrove fringe and marine seagrasses. Petitioner's resource inventory was done using GIS aerial photography so that the aerial benthic resource surveys submitted to DEP were not ground- truthed. DEP staff conducted physical site inspections and ground-truthing inspections that included swimming in the open surface waters. DEP staff found significant marine seagrasses and sponges that were not mentioned in Petitioner's resource surveys. Depending on the lot, the Project would fill approximately 6,000 square feet of wetlands and other surface waters, i.e., 900 to 2,500 square feet of mangrove habitat and 4,000 to 4,800 square feet of marine seagrass bed habitat. The seawalls depicted in the final version of Petitioner's site plans were "vertical seawalls" because the rip-rap would not face the seawalls to the mean high water line (MHWL). The rip-rap would be placed on submerged resources inside the property lines of the Subject Lots. Also, Petitioner's final plans did not include the mooring of vessels. Vertical seawalls are prohibited in the OFW of the County. Petitioner did not affirmatively demonstrate that fill or shoreline stabilization could be accomplished by using native vegetation instead of vertical seawalls. Secondary Impacts DEP's expert witness, Ms. Mills, testified that Petitioner's ERP applications did not identify any potential secondary impacts. Ms. Mills testified that the expected secondary impacts from the Project included stormwater runoff, shading, and erosion or shoaling. Although the Project plans showed that stormwater would be collected and directed to Floral Avenue, DEP's investigation established that there is no stormwater management system on the side of Floral Avenue abutting the Subject Lots. Thus, the collected and directed stormwater would end up flowing back into the mangrove fringe and surface waters at the lot locations that were not proposed for development, e.g., Lots 36 and 38. The proposed single-family homes are piling-supported structures. Ms. Mills testified that the piling-supported structure would cause shading of the immediate adjacent resources on either side. She identified potential shading impacts to the resources of the undeveloped Lots 36 and 38. In addition, Ms. Mills identified potential erosion or shoaling impacts to the undeveloped Lots 36, 38, and unnamed lots to the left of Lot 40 since they would be surrounded by developed fill on either side. Although Mr. Swakon testified that tidal velocity is low in this area, other aspects, such as effects from wind-driven circulation, were not adequately addressed. Mitigation Petitioner was required to propose mitigation to offset remaining direct and secondary impacts after going through a reduction and elimination exercise. However, Petitioner did not propose any revisions to the Project to reduce or eliminate the direct and secondary impacts identified above. Ms. Mills explained that appropriate mitigation usually provides benefits to the same type of ecological community as the one being impacted. Petitioner's ultimate mitigation proposal was to purchase saltwater credit at a mitigation bank, the Florida Power and Light Everglades Mitigation Bank (FPL EMB). The FPL EMB is located on the mainland of Florida approximately a hundred miles away from the Subject Lots. Ms. Mills testified that saltwater credit would be appropriate to offset and replace the same ecological function of mangroves, but not to offset the submerged benthic communities that would be impacted by the Project. Mr. Swakon testified that calculation of the amount of mitigation credits included a multiplier to address secondary and cumulative impacts, the out-of-kind mitigation, and the dissimilarities in the communities. However, Ms. Mills persuasively testified that the proposed multiplier was not sufficient to justify the three aspects of impact that needed to be offset. Whether to justify dissimilarities between the ecological communities, secondary and cumulative impacts, or the distance of the mitigation site from the Project, the multiplier was not sufficient. Cumulative Impacts The Project is not within a recognized cumulative impact basin of the South Florida Water Management District (SFWMD) for mitigation of impacts purposes. Accordingly, Ms. Mills testified that the plain language of a cumulative impacts analysis is considered. Contiguous lots to the Subject Lots owned by Petitioner could be developed through similar requests in the future. Also, each ERP application's cumulative impact analysis would consider the other four ERP applications as in-house examples of potential future projects. Common Plan of Development Petitioner contested DEP's conclusion that the Project was a common plan of development subject to section 2.0 of the Applicant's Handbook Volume 1 and associated stormwater management requirements. The Project would facilitate the advancement of land uses such as multiple residences, a residential subdivision, or phased site development. The Project comprised a total land area divided into multiple lots or parcels that are under common ownership or control. In total, Petitioner owns 648 lots under common ownership within the Key Haven Tenth and Eleventh Addition. The Subject Lots are all part of a residential subdivision. Thus, the preponderance of the evidence demonstrated that the Project was a common plan of development. For this common plan of development, Petitioner's proposed stormwater management consisted of a cap on the proposed seawalls directing stormwater to swales on each lot. The swales would then direct stormwater to Floral Avenue with no additional treatment or management. During site inspections, DEP staff did not find any evidence of stormwater management along Floral Avenue. Seawalls and Rip-rap The seawalls depicted in the final version of Petitioner's ERP applications would be vertical seawalls because the rip-rap facing the seawall did not come above the MHWL. In addition, the final plans did not include the mooring of vessels. As found above, the Project would place fill, seawalls, and rip-rap on marine seagrasses and sponges. Petitioner failed to affirmatively demonstrate that native vegetation was not sufficient to prevent erosion. The evidence established that Petitioner did not apply for any waiver or variance of applicable ERP rule criteria. FCMP Consistency The evidence demonstrated that Petitioner refused to address DEO's objections based on a mistaken view of the criteria governing ERP applications in the County and the Florida Keys ACSC. Relevant to this proceeding, DEO exercises authority over the ACSC program. See § 380.05, Fla. Stat.; see also § 380.23(6), Fla. Stat. (Each agency charged with implementing statutes and rules that are part of the FCMP, shall be afforded an opportunity to provide DEP with its comments and determination regarding consistency of the activity with those statutes and rules.). Section 380.05(16) prohibits persons from undertaking any development within the Florida Keys ACSC, except in accordance with the PGDs. Thus DEO, as the administrator of the ACSC program, reviewed the ERP applications for consistency with applicable regulatory requirements. DEO issued objections to approval of the permits citing inconsistency with the Florida Keys ACSC PGDs; and inconsistencies between the Project and the County's Comp Plan and LDC which implement the PGDs. DEO identified that the Project would be inconsistent with four PGDs. DEO's expert witness, Ms. Powell, testified that the Project was inconsistent with the PGD, which provides for strengthening local government capabilities for managing land use and development so that the local government is able to achieve these objectives without continuing the ACSC designation. See § 380.0552(7)(a), Fla. Stat. Ms. Powell persuasively testified that the ERP applications were inconsistent with this PGD because the Project would impair the local government's ability to have the ACSC designation removed. Allowing development inconsistent with its regulations would hurt the local government's ability to pursue de-designation. No evidence was presented by Petitioner that the Project would be consistent with this PGD. The second PGD cited by DEO provides for protecting shoreline and marine resources, including mangroves, coral reef formations, seagrass beds, wetlands, fish and wildlife, and their habitat. See § 380.0552(7)(b), Fla. Stat. It was undisputed that the Project would result in total removal of the mangrove and buttonwood fringe on each lot and 100% destruction of existing submerged marine resources. No evidence was presented by Petitioner that the Project would be consistent with this PGD. The third PGD cited by DEO provides for limiting the adverse impacts of development on the quality of water throughout the Florida Keys. See § 380.0552(7)(e), Fla. Stat. Ms. Powell testified that degradation to nearshore water quality from prior dredge and fill activity was one of the reasons for the designation of the Florida Keys as an ACSC. Additionally, as further discussed below, the Project would be inconsistent with the County's Comp Plan policies and LDC regulations that further the goal of protecting the quality of water throughout the Florida Keys ACSC. No evidence was presented by Petitioner that the Project would be consistent with this PGD. The fourth PGD cited by DEO provides for protecting the public health, safety, and welfare of the citizens of the Florida Keys, and maintaining the Florida Keys as a unique Florida resource. See § 380.0552(7)(n), Fla. Stat. As further discussed below, the Project would be inconsistent with the County's Comp Plan and LDC regulations that prohibit the use of structural fill within velocity zones. No evidence was presented by Petitioner that the Project would be consistent with this PGD. Ms. Powell testified that DEO considered the remaining statutory PGDs, and determined they were not particularly applicable to these ERP applications. In accordance with its duties, DEO had also reviewed and approved the County's Comp Plan and LDC as consistent with the statutory PGDs. DEO identified that the Project would be inconsistent with seven Comp Plan policies. They are Policies 102.1.1, 101.5.25, 203.1.1, 204.2.2, 204.2.3, 204.2.4, and 212.5.3. Policy 102.1.1 provides: The County shall protect submerged lands and wetlands. The open space requirement shall be one hundred (100) percent of the following types of wetlands: submerged lands mangroves salt ponds fresh water wetlands fresh water ponds undisturbed salt marsh and buttonwood wetlands Allocated density (dwelling units per acre) shall be assigned to freshwater wetlands and undisturbed salt marsh and buttonwood wetlands only for use as transferable development rights (TDRs) away from these habitats. Submerged lands, salt ponds, freshwater ponds, and mangroves shall not be assigned any density or intensity. Policy 101.5.25 provides that "[t]he allocated densities for submerged lands, salt ponds, freshwater ponds, and mangroves shall be 0 and the maximum net density bonuses shall not be available." Policy 203.1.1 provides that "[t]he open space requirement for mangrove wetlands shall be one hundred (100) percent. No fill or structures shall be permitted in mangrove wetlands except for elevated, pile-supported walkways, docks, piers and utility pilings." Policy 204.2.2 provides: To protect submerged lands and wetlands, the open space requirement shall be 100 percent of the following types of wetlands: submerged lands; mangroves; salt ponds; freshwater wetlands; freshwater ponds; and undisturbed salt marsh and buttonwood wetlands. Allocated density (dwelling units per acre) shall be assigned to freshwater wetlands and undisturbed salt marsh and buttonwood wetland only for use as transferable development rights away from these habitats. Submerged lands, salt ponds, freshwater ponds and mangroves shall not be assigned any density or intensity. Within one (1) year after the adoption of the 2030 Comprehensive Plan, the County shall revise the LDC to include a prohibition of development in salt ponds. Policy 204.2.3 provides: No structures shall be permitted in submerged lands, mangroves, salt ponds, or wetlands, except for elevated, pile-supported walkways, docks, piers, and utility pilings. No fill shall be permitted in submerged lands, mangroves, salt ponds, or wetlands except: as specifically allowed by Objective 212.5 and subsequent Policies; to fill a manmade excavated water body, such as a canal, boat ramp, or swimming pool if the Director of Environmental Resources determines that such filling will not have a significant adverse impact on marine or wetland communities; or as needed for shoreline stabilization or beach renourishment projects with a valid public purpose that furthers the goals of the Monroe County Comprehensive Plan, as determined by the County. Policy 204.2.4 provides: No fill or structures shall be permitted in mangroves or wetlands except as allowed by Policy 204.2.3 (as amended) and for bridges extending over mangroves or wetlands that are required to provide automobile or pedestrian access to dwelling units located on upland areas within the same property for which there is no alternative means of access. Such bridges shall be elevated on pilings such that the natural movement of water, including volume, rate, and direction of flow shall not be disrupted or altered. Upland areas shall include disturbed wetlands that have been lawfully converted into uplands through filling. Policy 212.5.3 provides: Bulkheads, seawalls or other hardened vertical shoreline structures shall be permitted on residential canals and altered shorelines only in the following situations: to replace an existing deteriorated bulkhead or seawall; or to stabilize a severely eroding shoreline area. DEO's expert witness, Ms. Powell, persuasively testified that the Project was inconsistent with all seven policies, because it did not protect the submerged lands and wetlands, did not provide for 100% open space within the submerged lands and wetlands, and provided for the construction of a seawall not excepted from the general prohibition. Petitioner did not present any evidence that the Project was consistent with the cited policies. Instead, Petitioner's witness, Mr. Nelson, testified that he felt certain County regulations would militate in favor of allowing the development. The main factor cited by Mr. Nelson was that the Subject Lots were designated as Tier III parcels under the County's LDC. However, designation of a parcel as Tier III did not conflict with the policies cited by DEO. The more credible and persuasive evidence concerning the Project's compliance with the Comp Plan policies was provided by Ms. Powell, who concluded that the Project was not consistent with those policies. DEO identified that the Project would be inconsistent with six sections of the County's LDC regulations. Those are sections 118-4, 118-10(e), 118-12(k)(2), 122-4(b)(5), 130-157, and 130-162. The LDC regulations are more specific methods for implementing the Comp Plan policies outlined above. Section 118-4 provides: No development activities, except as provided for in this chapter, are permitted in submerged lands, mangroves, salt ponds, freshwater wetlands, freshwater ponds, or in undisturbed salt marsh and buttonwood wetlands; the open space requirement is 100 percent. Allocated density (dwelling units per acre) shall be assigned to freshwater wetlands and undisturbed salt marsh and buttonwood wetlands only for use as transferable development rights away from these habitats. Submerged lands, salt ponds, freshwater ponds and mangroves shall not be assigned any density or intensity. Section 118-10(e), in relevant part, provides: Mangroves, wetlands, and submerged lands. All structures developed, used or occupied on land classified as mangroves, wetlands or submerged lands (all types and all levels of quality) shall be designed, located and constructed such that: Generally. Only docks and docking facilities, boat ramps, walkways, water access walkways, water observation platforms, boat shelters, nonenclosed gazebos, riprap, seawalls, bulkheads, and utility pilings shall be permitted on or over mangroves, wetlands, and submerged lands, subject to the specific restrictions of this subsection. Trimming and/or removal of mangroves shall meet Florida Department of Environmental Protection requirements. * * * (4) Placement of fill. No fill shall be permitted in any mangroves, wetlands, or submerged lands except: As specifically allowed by this Section or by Section 118- 12(k) (Bulkheads, Seawalls, Riprap) and 118-12(l) (Boat Ramps); To fill a manmade, excavated water body such as a canal, boat ramp, boat slip, boat basin or swimming pool if the County Biologist determines that such filling will not have a significant adverse impact on marine or wetland communities; As needed for shoreline stabilization or beach renourishment projects with a valid public purpose that furthers the goals of the Monroe County Comprehensive Plan, as determined by the County Biologist; For bridges extending over salt marsh and/or buttonwood association wetlands that are required to provide automobile or pedestrian access to lawfully established dwelling units located on upland areas within the same property for which there is no alternate means of access. Such bridges shall be elevated on pilings so that the natural movement of water, including volume, rate and direction of flow shall not be disrupted or altered; or As approved for Disturbed Salt Marsh and Buttonwood Association Wetlands with appropriate mitigation as defined by the wetland regulations of subsection (e)(6) of this Section. Section 118-12(k)(2) provides: (2) Vertical type seawalls or bulkheads shall be permitted only to stabilize severely eroding shorelines and only on manmade canals, channels, or basins. Such seawalls or bulkheads shall be permitted only if native vegetation and/or riprap and filter cloth is not a feasible means to control erosion. No new seawalls, bulkheads, or other hardened vertical structures shall be permitted on open water. Section 122-4(b)(5), in relevant part, provides: Coastal high-hazard areas (V zones). Within the areas of special flood hazard are areas designated as coastal high- hazard areas, which have special flood hazards associated with wave wash. The following provisions shall apply in these areas: * * * e. There shall be no fill used as structural support. Section 130-157, Maximum Permanent Residential Density and Minimum Required Open Space, provides at note (a): (a) The allocated densities for submerged lands, salt ponds, freshwater ponds, and mangroves shall be 0 and the maximum net density bonuses shall not be available. Section 130-162, Maximum Densities for Hotel/Motel, Campground, Recreational Vehicle, Seasonal and Institutional Residential Uses, and Minimum Open Space, proves at note (a): (a) The allocated densities for submerged lands, salt ponds, freshwater ponds, and mangroves shall be 0 and the maximum net density bonuses shall not be available. Ms. Powell persuasively testified that the Project was not consistent with the County's LDC regulations in sections 118-4, 118-10(e), 118-12(k)(2), 122- 4(b)(5), 130-157, and 130-162. The Project was inconsistent with the cited LDC regulations because it sought to construct seawall in submerged land, fill portions of the lots subject to a 100% open space requirement, remove the entirety of the existing mangrove fringe, impair 100% of the marine seagrass resources within the Subject Lots, and utilize structural fill within a Federal Emergency Management Agency (FEMA) designated Velocity Zone. The preponderance of the evidence demonstrated that the Project did not meet the criteria of part IV of chapter 62-312 and section 380.0552. The testimony also demonstrated that Petitioner did not apply for a variance or waiver of the County's LDC regulations. Conditions for Issuance Petitioner generally argued that the five applications provided reasonable assurance for issuance of individual ERPs. However, the persuasive and credible evidence established that the Project did not satisfy a majority of the conditions for issuance under rule 62-330.301. Petitioner failed to provide adequate information regarding stormwater management, the impacts of runoff to Floral Avenue, and runoff flowing back into the Gulf of Mexico OFW. This failure resulted in a lack of reasonable assurance that the Project would not cause adverse flooding to on-site or off-site property; would not cause adverse water quantity impacts to receiving waters and adjacent lands; and would not adversely affect the quality of receiving waters. The preponderance of the evidence demonstrated that the Project would adversely impact the value of functions provided to fish and wildlife and listed species by wetlands and other surface waters. Those functions would be 100% impacted and the impacts would not be adequately offset by appropriate mitigation. As found above, the Project would cause adverse secondary impacts to the water resources, adverse impacts to surface water conveyance, and the adverse impacts would not be adequately offset by appropriate mitigation. Additional Conditions for Issuance Petitioner generally contended that the five applications provided reasonable assurance that the Project was clearly in the public interest under rule 62-330.302. However, the persuasive and credible evidence established that the Project did not satisfy a majority of the applicable additional conditions for issuance. The Project would adversely affect the public health, safety, or welfare or the property of others because Petitioner failed to provide adequate information regarding stormwater management. DEP's site inspection found no stormwater management or treatment system on the side of Floral Avenue adjacent to the Subject Lots. Thus, the collected and directed stormwater would end up flowing back into the mangrove fringe and the OFW. The preponderance of the evidence demonstrated that the Project would adversely affect the conservation of fish and wildlife, or their habitat, as a result of the 100% impact to benthic communities, which would not be adequately offset by appropriate mitigation. The preponderance of the evidence demonstrated that the Project would adversely affect marine productivity, the current condition, and the relative value of functions being performed by the impacted areas. Also, the Project would be permanent in nature. The preponderance of the evidence demonstrated that Petitioner failed to provide reasonable assurance that there would not be harmful erosion or shoaling. The Project would not adversely affect or enhance any significant historical and archaeological resources. The Project would not be within a recognized cumulative impact basin of the SFWMD for mitigation of impacts purposes. Contiguous lots to the Subject Lots owned by Petitioner could be developed through similar requests in the future. Each ERP application's cumulative impact analysis would consider the other four ERP applications as in-house examples of potential future projects. Thus, Petitioner did not provide reasonable assurance that each ERP application would not cause unacceptable cumulative impacts upon wetlands and other surface waters.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is, RECOMMENDED that DEP enter a final order denying Petitioner's five ERP applications. DONE AND ENTERED this 14th day of April, 2021, in Tallahassee, Leon County, Florida. S FRANCINE M. FFOLKES Administrative Law Judge 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 14th day of April, 2021. COPIES FURNISHED: Kathryn E.D. Lewis, Esquire Department of Environmental Protection Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399 Jay Patrick Reynolds, Esquire Department of Environmental Protection Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399 William Moore, Esquire Moore Bowman & Reese, P.A. Suite 100 551 North Cattlemen Road Sarasota, Florida 34232 Justin G. Wolfe, General Counsel Department of Environmental Protection Legal Department, Suite 1051-J Mail Station 35 Douglas Building 3900 Commonwealth Boulevard Tallahassee, Florida 32399 Jon F. Morris, Esquire Brandon W. White, Esquire Department of Economic Opportunity 107 East Madison Street, Mail Station 110 Tallahassee, Florida 32399 Lea Crandall, Agency Clerk Department of Environmental Protection Douglas Building, Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399 Noah Valenstein, Secretary Department of Environmental Protection Douglas Building 3900 Commonwealth Boulevard Tallahassee, Florida 32399 Valerie A. Wright, Esquire Department of Economic Opportunity 107 East Madison Street Tallahassee, Florida 32399

Florida Laws (14) 120.52120.569120.57120.68267.061373.042373.086373.413373.414373.428380.05380.0552380.23403.813 Florida Administrative Code (8) 62-302.30062-312.40062-312.41062-312.44062-312.45062-330.30162-330.30262-4.242 DOAH Case (5) 20-065920-066020-066120-066220-0663
# 1
THOMAS A. DRISCOLL vs SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT, ENGLE HOMES AND LAKE BERNADETTE, INC., 01-002471 (2001)
Division of Administrative Hearings, Florida Filed:Tampa, Florida Jun. 25, 2001 Number: 01-002471 Latest Update: Dec. 03, 2001

The Issue The ultimate legal and factual issue in this matter is whether Engle Homes, Inc., and Lake Bernadette, Inc. (Permittees), have provided the Southwest Florida Water Management District (District) with reasonable assurances that the activities they propose to conduct pursuant to Management and Storage of Surface Water (MSSW) General Construction Permit No. 49005837.017 (the Permit) meet the conditions for issuance of permits established in Rules 40D-4.301, 40D-4.302, and 40D- 40.302, Florida Administrative Code. In particular, the issues of fact to be litigated are whether the Project will cause adverse water quality impacts to receiving waters and adjacent lands; whether the Project will cause adverse flooding of on-site or off-site property; whether the Project will cause impacts to existing surface water storage and conveyance capabilities; and whether the Project will adversely affect the property of others.

Findings Of Fact The Parties Engle Homes, Inc., and Lake Bernadette, Inc., are corporations licensed to operate in the State of Florida. The District is the administrative agency charged with the responsibility to conserve, protect, manage, and control water resources within its boundaries pursuant to Chapter 373, Florida Statutes, and the rules promulgated thereunder as Chapter 40D, Florida Administrative Code. Driscoll resides at 35716 Welby Court, Zephyrhills, Florida 33541, Lot 14, within the Timber Creek 2 Subdivision (Subdivision). Driscoll requested this hearing to show the District that there is a drainage problem on Lots 13 and 14, and the adjacent Geiger property to the south, which should be fixed at this time and as part of the Project. Driscoll wants "Engle Homes to propose a new solution to fix the entire Welby Court Geiger property problem," i.e., from Lots 4 through 14, and not a piecemeal solution as proposed in the Permit modification. The Subdivision Engle Homes, Inc., and Lake Bernadette, Inc., developed the Timber Creek 2 Subdivision. Lots 15 through 25 run east to west and are north of Welby Court. Lots 15 and 16 are located north of the cul-de-sac, on the eastern portion of Welby Court. Lots 3 through 14 run west to east, south of Welby Court. Lots 13 and 14 are south of the cul-de-sac on the eastern portion of Welby Court and are across the street and the cul-de-sac from Lots 16 and 15, respectively. Residences exist on Lots 5, and 7 through 14. Driscoll owns Lot 14, a corner lot, which is the southeastern most lot of the Subdivision. Don Geiger (Geiger) owns the land (approximately five acres) south of the property lines of Subdivision Lots 5 through Geiger's northern driveway, essentially a dirt road, runs parallel to Lots 5 through 14. Subsequent to the original construction activity involving the Subdivision, the developer realized that there was an "existing depression" (referenced on Engle Exhibit number 1), south of Lots 7 and 8, and on Geiger's property. Geiger complained to the District about standing water in this area. This depression area is approximately 90 feet long and 30 feet wide which needed to be "drained off" according to Geiger. The depressed area on Geiger's property was most likely caused when Lots 7 through 14 were graded and sodded, which raised the "lots up a few inches" above Geiger's driveway/property. Water is trapped during a storm event between the back yards and the depressed area. As a result, the southern end of the back yards, particularly Lots 7 and 8, and the driveway remain constantly wet. The Project On January 16, 2001, Engle Homes, Inc., and Lake Bernadette, Inc., filed MSSW Permit Application No. 49005837.017 with the District, to address the problems with the rear lot grading and the adjacent property. The actual Project area for the permit modification1 includes the southern portions of Lots 4 through 9 and south of the property lot line including Geiger's property. See Finding of Fact 5. The modified permit does not address the drainage area including the back yards of Lot 13 and Driscoll's Lot 14, and the other portion of Geiger's property/driveway to the south. On April 5, 2001, the District issued MSSW Permit No. 49005837.017 to Engle Homes, Inc., and Lake Bernadette, Inc., under the provisions of Chapter 373, Florida Statutes, and Chapter 40D-40, Florida Administrative Code, for the modification of a surface water management system to serve the Project area. The proposed Project will involve the construction of a concrete inlet box with a safety grate, storm sewers, and grass swales. Specifically, the project is intended to solve the drainage problems associated with the "existing depression" south of the boundary line for Lots 7 and 8 on Geiger's property (although Lots 4 through 9 ("area 1") are included within the Project area), and the back yards of Lots 7 and 8. A catch basin is proposed to be located south and on the lot line between Lots 8 and 9, which is expected to drain off the water in the depression area to the modified surface water management system. The inlet box will be placed in the corner between Lots 8 and 9. The collected water in the inlet box will be routed underground through a series of 18-inch storm sewer pipe straight north through a drainage easement between Lots 8 and 9 to Welby Court. The underground pipe ties into an existing pipe in front of Lot 9 on the street, then runs east along the Welby Court right-of-way and then north between Lots 19 and 20, and eventually north into a large permitted retention pond, located to the north of the Subdivision which will handle the stormwater. Driscoll's Alleged Drainage Problem There is another distinct drainage area, i.e., "area 2," which includes Geiger's property and the southern portions of Lots 13 and 14, where water drains from south to north into a roadside ditch to Geiger Cemetery Road ("area 3"), which runs south to north and east of Lots 14 and 15. During a September 2001 tropical storm, there was standing water on Geiger's driveway, directly south of Lots 13 and 14, which was present for more than 3 days. This was referred to by Mr. Barrett as a "small drainage problem that could easily be corrected." On the other hand, Geiger says that there is standing water on his driveway, south of Lots 13 and 14, "all the time." This caused Geiger to move his driveway "50 or 60 feet" south. According to Geiger, the berm, which runs across Lots 10 through 14, should be lowered and the backyards reconfigured. But this would be quite disturbing to the neighbors. Therefore, Geiger recommends the placement of drains south of Lots 13 and 14, which would direct the water out to the ditch at Geiger Cemetery Road and away from Driscoll's Lot 14. The modified Permit is not intended to solve this problem, although Driscoll wants this problem fixed. It is not necessary to resolve Driscoll's issue regarding whether there is a drainage problem in and around Driscoll's lot. The two drainage areas 1 and 2 discussed herein are not connected, although they are close in proximity. The solution to the first problem has no impact on the second, and there is no cited statutory or rule requirement that both issues must be addressed in this Permit application. This is Driscoll's quandary. Compliance with Rules 40D-4.301 and 40D-4.302, Florida Administrative Code The Project will not impact wetlands or surface waters. The Project will not adversely impact the value of functions provided to fish and wildlife, and listed species, including aquatic and wetland-dependent species, by wetlands or other surface waters and other water-related resources. The Project will not adversely impact the quality of receiving waters such that the water quality standards will be violated. The Project will not cause adverse secondary impacts to the water resources. The Project will not adversely impact the maintenance of surface or groundwater levels or surface water flows established pursuant to Section 373.042, Florida Statutes. The Project will not cause adverse impacts to a work of the District. The Project is capable, based on generally accepted engineering and scientific principles, of being effectively performed and of functioning as proposed. The Project will be conducted by an entity with financial, legal, and administrative capability of ensuring that the activity will be undertaken in accordance with the terms and conditions of the permit, if issued. The Project will comply with any applicable special basin or geographic area criteria established pursuant to Chapter 40D, Florida Administrative Code, by the District. The Project will not adversely affect the public health, safety, or welfare. The Project will not adversely impact the conservation of fish and wildlife, including endangered or threatened species, or their habitats. The Project will not adversely affect navigation. The Project will not cause harmful erosion or shoaling. The Project will not adversely affect fishing or recreational values or marine productivity in the vicinity of the Project. The Project will not adversely affect significant historical and archeological resources. The Project will not cause unacceptable cumulative impacts upon wetlands and other surface waters. The Project area is less than 100 acres. The Project does not require dredging or filling of wetlands, or construction of boat slips. The Project is not contrary to the public interest. The Project will not cause adverse water quantity impacts to receiving waters and adjacent lands, and will not adversely affect or impact the property of others, including Driscoll's property, Lot 14. "Area 1," between Lots 4 and 9, is a separate drainage area, and the water from this area does not drain to Lot 14. Driscoll's property is not within the Project area, and the Project was not intended to resolve his alleged drainage problem. The Project will not cause adverse flooding to on-site or off-site property. The Project will not cause adverse impacts to existing surface water storage and conveyance capabilities. Rather, the project is expected to improve the conveyance of water and drainage for "area 1" and the Project area.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Southwest Florida Water Management District enter a final order issuing Management and Storage of Surface Water General Construction Permit No. 49005837.017. DONE AND ENTERED this 24th day of October, 2001, in Tallahassee, Leon County, Florida. CHARLES A. STAMPELOS Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 24th day of October, 2001.

Florida Laws (2) 120.569373.042
# 2
FLORIDA KEYS CITIZENS COALITION vs DEPARTMENT OF TRANSPORTATION AND SOUTH FLORIDA WATER MANAGEMENT DISTRICT (940606-10 (MSSW) AND 940606-2-D (WRM)), 95-005525 (1995)
Division of Administrative Hearings, Florida Filed:Fort Lauderdale, Florida Nov. 17, 1995 Number: 95-005525 Latest Update: Dec. 29, 1997

The Issue Whether FDOT has provided reasonable assurances that the activities it proposes to conduct pursuant to proposed District SWM Permit Application No. 940606-10, WRM Permit Application No. 940606-2-D and modification to ROW Permit No. 2584 will comply with the relevant permit criteria set forth in Chapters 373 and 403, F.S., and applicable rules and criteria promulgated thereunder.

Findings Of Fact THE PARTIES Petitioner, 1000 Friends of Florida (1000 Friends), is a not-for-profit, tax exempt membership corporation, organized and existing under the laws of the State of Florida. The principal office of 1000 Friends is 926 East Park Avenue, Tallahassee, Florida 32314 and it also maintains an office at 3305 College Avenue, Ft. Lauderdale, Florida 33314. Petitioner, Florida Bay Initiative, Inc. (FBII), is an entity incorporated under the laws of Florida with its principal office located at 250 Australian Avenue South, Suite 500, West Palm Beach, Florida 33401. Petitioner, the Florida Keys Fishing Guides Association, is an association of sport fishing guides who live in the Florida Keys and is headquartered at 138 Royal Lane, Islamorada, Florida 33036. Petitioner, Michael Collins, is a private individual. His address is 138 Royal Lane, Islamorada, Florida 33036. Petitioner, Charles W. Causey, is a private individual. His address is Post Office Box 448, Islamorada, Florida 33036. Petitioner, the Florida Keys Concerned Citizens Coalition (FKCC), is a not-for-profit Florida corporation whose address is West Shore Drive, Big Pine Key, Florida 33043. Petitioner, AG Intus, Inc., filed a Notice of Voluntary Dismissal on August 9, 1996. DOAH Case 95-5524, the proceeding filed by Intus, was previously consolidated with the other cases to this proceeding. On August 12, 1996, the Intus case was severed from this proceeding and the Intus hearing cancelled. Respondent, the South Florida Water Management District (the District or SFWMD), is a public corporation in the State of Florida existing by virtue of Chapter 25270, Laws of Florida, 1949, and operating pursuant to Chapter 373, F.S., and Title 40E, F.A.C., as a multi-purpose water management district, with its principle office in West Palm Beach, Florida. Respondent, the Florida Department of Transportation (FDOT), is an agency of the State of Florida. Its District Six address is 1000 N.W. 111th Avenue, Miami, Florida 33172. Intervenor, Monroe County, is a political subdivision of the State of Florida. For the purposes of this proceeding the address for Monroe County is c/o Apgar and Pelham, 909 East Park Avenue, Tallahassee, Florida 32301. The District, FDOT and Monroe County did not object to the standing of the Petitioners at the formal hearing and represented that they will not object to the standing in the event of an appeal. Based on the representations of the Respondents, the Petitioners were not required to put on a case as to their standing. THE THREE PERMIT APPLICATIONS FDOT has applied to the District for a Wetland Resource Management (WRM) permit, a Surface Water Management (SWM) permit, and a Right of Way (ROW) occupancy permit. On June 6, 1994, the Applicant submitted applications for surface water management and wetland resource management permits for the purpose of widening and modifying this 20.4 mile stretch of U.S. 1. The surface water management permit application is identified as Application No. 940606-10. The wetland resource management permit application is identified as Application No. 940606-2-D. On October 24, 1995, the District issued Staff Reports on Permit Application No. 960606-10 and Permit Application No. 94060-2-D. These Staff Reports recommended issuance of the permits subject to general and special conditions as specified therein. An addendum to the staff report was issued November 3, 1995. On September 27, 1994, the Applicant submitted a request to modify its existing ROW Occupancy Permit to enable it to replace the bridge where U.S. 1 crosses the C-111 Canal. The land encompassed by the ROW occupancy permit challenged in this proceeding is located in Section 16 and 17, Township 59 South, Range 39 East, Dade County, Florida. A draft right-of-way occupancy permit with standard limiting and special conditions was produced as part of a package that went to the Governing Board and others. The proposed authorization for use of the ROW is for the following: REMOVAL OF EXISTING U.S. HIGHWAY 1 BRIDGE AND REPLACEMENT WITH A NEW FIXED BRIDGE. PROJECT INCLUDES CONSTRUCTION OF A NEW SERVICE/ACCESS ROAD, 2 DETENTION PONDS, 2 CATCH BASINS, 2-15" R.C.P. OUTFALLS, BOAT RAMP WITH LOADING DOCK, PARKING AREA, PEDESTRIAN GATE AT S-197, FENCING AND WILDLIFE CROSSING ALL WITHIN THE NORTH AND SOUTH RIGHT OF WAY OF C-111 (STATION 938+00 - 955+00). The draft right-of-way occupancy permit modification, identified as “SFWMD PERMIT NO. MOD 2548," should correctly be identified at “SFWMD PERMIT NO. MOD 2584.” The numbers “8” and “4” were inadvertently transposed. STIPULATIONS AS TO APPLICABLE LAW The parties have accurately set forth the applicable permitting criteria and the appropriate Basis of Review in their prehearing stipulation. CRITERIA FOR ROW PERMIT Rule 40E-6.301, Florida Administrative Code, provides, in pertinent part, as follows: In determining whether an occupancy permit should be issued, the District shall consider whether the proposed activity: interferes with the present or future construction, alteration, operation or maintenance of the works of the District; is consistent with the policy and objectives of Chapter 373 F.S., the legislative declaration of policy contained in Section 373.016, F.S. and the state water policy, Chapter 17-40, F.A.C.; has an actual or potential negative impact upon environmentally sensitive areas, which include: wetlands; endangered or threatened species habitat; aquatic preserves; outstanding Florida waters; federal, state and privately owned parks and wildlife management areas; designated areas of critical state concern; lands purchased by federal, state and local governments for the purpose of environmental protection, water resource protection and esthetics; and lands which contain native terrestrial plant species in significant amounts. Environmentally sensitive areas include areas on and off- site that are affected by activities which occur on, or are initiated from, the District’s works; degrades water quality within the receiving water body or fails to meet the provisions of Ch. 373, F.S., the state water policy, and Ch. 40E, F.A.C.; involves a discharge of wastewater from a new wastewater source or an increased discharge from an existing wastewater source; will discharge debris or aquatic weeds into District lands or works or cause erosion or shoaling within the works of the District; is supported by financial assurances, which will ensure that the proposed activity will be conducted in accordance with Chapter 373, F.S., and Chapter 40E-6, F.A.C.; presents an increased liability risk to the District; meets the general and specific criteria in the Basis of Review which is incorporated by reference in Rule 40E- 6.091, F.A.C.; interferes with actual or potential public use of the District’s works or public, recreational or other facilities not within the District’s works; is consistent with local zoning and other private land uses in the area; interferes with the quality or quantity of a public or private water supply; meets applicable criteria in Chapters 40E-61 and 40E-62, F.A.C.; ROW occupancy permits typically have standard limiting conditions which are incorporated as part of the permit. The permit may also have special limiting conditions. CRITERIA FOR PERMITTING THE SWM SYSTEM Rule 40E-4.301(1), Florida Administrative Code, contains the following criteria that, at the times pertinent to this proceeding, were used by SFWMD in determining whether to permit a surface water management system: In order to obtain or modify a permit under this chapter, an applicant must give reasonable assurances that the surface water system: provides adequate flood protection and drainage, without causing over- drainage, will not cause adverse water quality and quantity impacts on receiving waters and adjacent lands regulated pursuant to Chapter 373, F.S., will not cause discharges which result in any violations, in surface waters of the state, of the standards and criteria of chapter 17-302, F.A.C., will not cause adverse on-site or off-site impacts on surface and groundwater levels and flows, including impacts to sources of water supply and wetland hydrology, will not cause adverse environmental impacts, can be effectively operated and maintained, will not adversely affect public health and safety, is consistent with the State Water Policy, chapter 17-40, F.A.C., for a DRI with a signed Preliminary Development Agreement with the Florida Department of Community Affairs, pursuant to section 380.06(8), F.S., provides a surface water management system for that portion of the site approval for development which is able to operate separately from the surface water management system for the balance of the project site and still meet applicable District criteria. meets any applicable basin criteria in chapter 40E-41, F.A.C., will not otherwise be harmful to the water resources of the District, will not interfere with the legal rights of others as defined in subsection 17-40.401(8), F.A.C., is not against public policy, will meet general and specific criteria in the document described in subsection 40E-4.091(1)(a), F.A.C., (0) will meet criteria for isolated wetlands, which are found in Appendix 7 of the document described in rule 40E- 4.091(1)(a), F.A.C., (p) will meet the criteria for above ground impoundments, which are found in Appendix 6 of the document described in rule 40E-4.091(1)(a), F.A.C. The SFWMD has adopted certain procedures and criteria contained in a document, referred to as “Basis of Review for Surface Water Management Permit Applications Within The South Florida Water Management District” (BOR). Subsection 40E-4.091(1)(a), F.A.C. incorporates this document by reference into Chapter 40E-4, F.A.C. The BOR is a document that is “described in subsection 40E-4.091(1)(a), F.A.C.,” within the meaning of Rule 40E-4.301(1), F.A.C. The BOR establishes a rebuttable presumption that water quality criteria are met through specified volumetric retention and detention requirements. These performance based criteria are designed to be flexible. CRITERIA FOR THE WRM PERMIT In 1992 DEP entered into an Operating Agreement with the District, which delegated to the District responsibility for issuing wetland resource management (WRM) permits, which are required for dredge and fill activities in wetlands. Both DEP and the District implement the same wetland resource permit and MSSW permit rules. The District agrees with DEP's interpretation and application of the WRM permitting rules and non-rule policy, and applies the same when issuing such permits. Section 403.918, Florida Statutes (1991), provides the pertinent criteria that must be applied by the District in determining whether to grant or deny the WRM permit. That criteria requires the applicant to provide reasonable assurance that water quality standards will not be violated. In addition, for projects in OFW, the applicant must provide reasonable assurance that the project is clearly in the public interest. THE PUBLIC INTEREST TEST The District is required to balance the following criteria, found at Section 403.918(2)(a), Florida Statutes (1991), in determining whether a project is clearly within the public interest: Whether the project will adversely affect the public health, safety, or welfare or the property of others; Whether the project will adversely affect the conservation of fish and wildlife, including endangered species, or their habitats; Whether the project will adversely affect navigation or the flow of water or cause harmful erosion or shoaling; Whether the project will adversely affect the fishing or recreational values or marine productivity in the vicinity of the project; Whether the project will be of a temporary or permanent nature; Whether the project will adversely affect or will enhance significant historical and archaeological resources under the provisions of s.267.061; and The current condition and relative value of functions being performed by areas affected by the proposed activity. MITIGATION If the applicant is unable to otherwise meet the public interest test, the District shall, pursuant to Section 403.918(2)(b), Florida Statutes, “consider measures proposed by or acceptable to the applicant to mitigate adverse effects which may be caused by the project . . .” The District thereafter re-evaluates the project to determine whether the project, as mitigated, meets the public interest test. The criteria for mitigation is found in Chapters 373 and 403, Florida Statutes, Title 40 E (including the Basis of Review) and Rule 62-312, Florida Administrative Code. Rule 62-312.330, Florida Administrative Code, states the general criteria for evaluating mitigation proposals as follows: The goal of the mitigation proposal shall be to offset the expected adverse impact of the project that have resulted in the project being deemed unpermittable such that the resulting project with mitigation is not contrary to the public interest or, in the case of Outstanding Florida Waters, is clearly in the public interest. Each project must be separately evaluated to determine whether the proposed mitigation is sufficient. Rule 62-312.340, Florida Administrative Code, provides guidelines that are to be used in evaluating proposed mitigation projects. GENERAL DESCRIPTION OF THE PROJECT AREA FDOT proposes to widen a 20.4 mile portion of U.S. 1 in southern Dade County and northern Monroe County. Approximately seven miles of the project area is in Monroe County and approximately thirteen miles is in Dade County. The northern terminus of the project is the intersection of U.S. 1 and Card Sound Road, which is located in Dade County south of Florida City. The southern terminus of the project is the intersection of U.S. 1 and Abaco Road on Key Largo in Monroe County. The corridor of the proposed project passes through Sections 6, 7, 16, 18, 21, 27, 28, Township 59 South, Range 39 East; Sections 24, 25, 36, Township 58 South, Range 38 East; Sections 16, 19, 30, 31, Township 58 South, Range 39 East, Sections 16, 30, 31, Township 60 South, Range 40 East; Sections 25, 26, Township 60 South, Ranges 39 East, Dade and Monroe Counties, Florida. U.S. 1 is the main highway between northern Monroe County and southern Dade County. The only other road between Monroe County and Dade County is Card Sound Road. The Florida Keys is designated as an Area of Critical State Concern, pursuant to Section 380.0552, Florida Statutes. The Dade County portion of the road, north of the C- 111 canal, lies within typical Everglades habitat, which is classified as environmentally protected lands of Dade County. Most of the project corridor in Dade County is part of or adjacent to the Everglades National Park. Valuable wetlands exist throughout the project corridor. The following bodies of water will receive discharges if the surface water management system is permitted: C-111 Canal, Jewfish Creek, Lake Surprise, Blackwater Sound, Barnes Sound, Little Blackwater Sound, Long Sound, Manatee Bay, Sarge Lake, andManatee Creek. The receiving bodies of water are Outstanding Florida Waters (OFWs) or are connected to OFWs. THE EXISTING ROADWAY As it presently exists in the project area, U.S. 1 is a two lane undivided highway with two passing zones that are each one mile in length. Each travel lane on the existing facility is twelve feet wide. The existing shoulder on either side of the road consists of four feet of pavement and six feet of grassed area. FDOT Exhibit 7 accurately depicts the existing roadway typical section. Exotic vegetation, generally limited to the areas immediately adjacent to the highway, exist throughout the project corridor. These exotic species are present because FDOT has failed to properly maintain its right of way. A clear zone is an unobstructed area that includes the shoulder of the roadway and typically extends beyond the shoulder. The purpose of the clear zone is to provide a driver who has lost control of his or her vehicle a sufficient clear recovery area to regain control of the vehicle so that it can be maneuvered back onto the road. The clear zone for the existing road is inadequate to provide a safe recovery area. There is at present a two lane bridge over Manatee Creek, a two-lane bridge crossing the C-111 Canal, a bascule bridge, which is a drawbridge, over Jewfish Creek, and a two lane causeway through Lake Surprise. The two existing passing zones are located in Dade County. The first is south of U.S. 1’s intersection with the C-111 canal between mile markers 113-115. The second passing lane is approximately four miles south of the northern terminus of the project between mile markers 120-122. Each existing passing zone is undivided and consists of two northbound lanes and two southbound lanes, with each travel lane being twelve feet in width. The shoulders in the passing zones are the same as for the typical section. A surface water management (SWM) system is defined by Rule 40E-4.021(5), Florida Administrative Code , as being "the collection of devices, improvements or natural systems whereby surface waters are controlled, impounded, or obstructed.". There is no surface water management system presently associated with the road. The roadbed is elevated approximately five feet above mean sea level according to the National Geodetic Vertical Datum and was constructed on the old railroad bed of the Florida East Coast Railroad. No hydrologic culverts have been placed within the roadbed. Consequently, surface water flow between the eastern and western sides of the road north of the C-111 Canal has been cut off. C-109 AND C-111 CANALS In the 1960's, the C-109 and C-111 canals were constructed as part of an overall water management system in the area. As a result of the roadbed and the canals, water has been impounded on the western side of U.S. 1 at a level higher than on the eastern side. Due to cutoff of waterflow by the roadbed embankment, historic freshwater flow between the eastern and western sides of the project area has been restricted, which has resulted in an adverse impact on the Everglades ecosystem north of the C-111 Canal. The restricted water flow has resulted in less fresh water being available for shorter periods of time. Consequently, aquatic life has had reduced opportunities to develop. The restricted flow also has impeded the ability of aquatic life to reach freshwater areas during times of drought. On the east side of the road marine conditions have displaced what naturally should be freshwater conditions. PROJECT HISTORY While FDOT has been aware of traffic safety and hurricane evacuations concerns on the roadway for a long time, the current project originated in 1986 when Monroe County identified this project as a need in its 1986 Comprehensive Plan. Pursuant to agency practice, the proposed project was incorporated into FDOT's five year work program and a study was performed pursuant to FDOT’s Project Development and Environment (PD&E) Manual. FDOT's PD&E manual describes the process by which FDOT determines whether to construct or improve a road. The PD&E process includes an Environmental Impact Statement (EIS) to analyze existing conditions, assess the need for improvement, and develop alternatives. A Draft EIS is performed and circulated for comment to governmental agencies and the public. Based upon comments and further review a Final EIS is prepared. Metric Engineering ("Metric") began the PD&E study of the project in 1988 pursuant to a contract with FDOT. Metric identified seven factors which it concluded supported the need for the project. First, the improved corridor would improve the linkage between the four lane road at the northern terminus and the four lane road at the southern terminus. Second, the project would improve navigation by replacing the existing bascule bridge at Jewfish Creek. Third, the project would improve the level of service for the road. Fourth, the project would improve the safety of the road. Fifth, the project would improve the clearance time for hurricane evacuation. Sixth, the project was consistent with the long range transportation plans adopted by Monroe County. Seventh, the project would accommodate increased traffic, which can be expected with or without the project. Based on the needs evaluation, Metric performed a corridor analysis to determine the best way to get from Florida City to Key Largo, including improving only Card Sound Road, improving only U.S. 1, or improving a combination of the two. Metric concluded that the best resolution was to improve the project corridor. Metric also analyzed various alternatives in an effort to reduce the size of the typical section of the roadway in the U.S. 1 corridor and thereby minimize environmental impacts of the project. Because of concerns from Everglades National Park that no aspects of the project construction occur within its boundaries, FDOT agreed to conduct all construction east of FDOT's existing right of way line. The conclusions of the Metric studies were memorialized in a Final EIS and Final Engineering Report published in 1992. Conclusions regarding alternatives and project needs were then incorporated into the permit application and have continued to be updated. The 1992 version of the project was for a four lane roadway with four lane bridges throughout the project corridor. Subsequent to its June 6, 1994, permit applications to the District for a four lane roadway, FDOT went through an extensive process of providing the District with additional information in an effort to provide the District with the necessary reasonable assurance that the proposed project would comply with the permit criteria. The final series of modifications contained the three lane alternative, which will be described in detail below and is now the subject of this proceeding. The three lane proposal is a compromise that FDOT agreed to in an effort to minimize the direct, secondary, and cumulative impacts of the project. Monroe County passed Resolution No. 315-1995 on September 7, 1995, asking FDOT to build a three-lane road on a four-lane embankment. This resolution provided, in part, that “. . . Monroe County finds that the '3-lane alternative' as described in the Statement of Agency Commitments is the most viable proposal of those considered, because it balances the needs for a widened highway with safeguards designed to address secondary impacts.” The secondary impacts referred to in the resolution included concerns that two southbound lanes would result in more growth. The rationale behind the resolution was that more growth would result from two southbound lanes than from one southbound lane with the proposed passing zones. In response to the request of Monroe County and in response to a similar request made by the District, FDOT notified the District by letter dated September 5, 1996 of FDOT's decision to redesign the project to change the roadway from four to three lanes. FDOT HAS MINIMIZED THE IMPACTS OF THE PROJECT During the PD&E process prior to permit application FDOT studied project needs and alternative alignments, and conducted corridor analyses. FDOT originally considered a proposal that included approximately 250 acres of wetlands impacts. At the District's suggestion, FDOT revised its proposal prior to the permit application to reduce the wetland impacts and project footprint. The application submitted contained approximately 165 acres of impact. FDOT changed the typical section of the proposed roadway again after substantial interagency coordination in an effort to reduce wetlands impacts even further. FDOT agreed to reduce the footprint by changing the design of the median from 22 feet and a Jersey barrier (which is a minimum barrier) to 20 feet with a tri-beam rail barrier. The more substantial barrier was added because the median was narrowed. Additionally, instead of ten-foot paved shoulders on each side of the median, FDOT would use two-foot paved shoulders with sixteen feet of grass in the middle. These minimization efforts resulted in a wetland impacts decrease from 164 acres to 149.07 acres, the current impact of the project. Avoidance, or choosing alternate routes to avoid impacts to wetlands, was not a possible option because only wetlands and open waters exist between the northern and southern terminus of the project. FDOT explored all reasonable alternatives to the proposed project, including a two lane alternative proposed by a consultant for FBII. As discussed below, FDOT did not adopt the two-lane alternative, because the alternative did not address all of FDOT's identified needs for the project. FBII prepared a report with a two-lane alternative to the proposed project. FBII's original proposal included one 12-foot northbound lane with a 10-foot paved shoulder covered with thermoplastic rumble strips to deter vehicular use of the shoulder. In the southbound direction, FBII proposed a 12-foot travel lane with a 4-foot paved shoulder, essentially the same as currently exists. That proposal was analyzed by Metric Engineering on behalf of FDOT. FDOT rejected the FBII alternative for several reasons. First, though the 10-foot northbound shoulder theoretically may be used by cars during hurricane evacuation, removal of the rumble strips would be impractical due to lack of time to do so under threat of a hurricane, and due to the costs involved. It would be unrealistic to require people to otherwise drive over the rumble strips, without removal, because they are designed to prevent such access. Using the 10-foot shoulder during an evacuation would result in there being no shoulder area to remove accident vehicles from the roadway which would otherwise threaten to restrict the flow of traffic or cease it altogether. The reduced width of the shoulder lane below the standard 12-foot lane would also decrease the flow of evacuees. FBII's proposal for a two-lane fixed-height bridge at Jewfish Creek would not completely eliminate rear-end collisions at the bridge. The two-lane alternative proposed by FBII is not a signed and sealed cross section. The proposal by FBII does not include the area necessary for a SWM system or for clear zones. FBII did not do an analysis to determine whether its proposal complies with pertinent FDOT roadway and traffic design standards or with pertinent highway safety and improvement standards. The FBII proposal does not account for removal of the Lake Surprise causeway or construction related impacts from barge traffic. FBII did not do a wetlands survey to determine the impact of its two-lane proposal. At the Final Hearing, Petitioners presented for the first time a new proposal to use "flexible diverters" to pave a third northbound lane and to block that lane from travel traffic with poles. However, no research was conducted into the feasibility of such a proposal, nor was it adequately thought out. Such a use of "flexible diverters" is unprecedented in FDOT's history, is impractical to implement, and would violate FDOT's design standards contained in its Manual on Uniform Traffic Control Devices. Petitioners also presented for the first time at the Final Hearing a proposal to add an 8 to 10 foot paved northbound shoulder which could be converted to a travel lane with traffic control cones in the event of an evacuation. This plan is also not feasible, because the resulting lanes would not be wide enough to safely accommodate evacuating traffic, and because the contradiction between existing road striping and the placement of cones would likely cause accidents, which would halt evacuation. The proposals submitted by FBII do not sufficiently improve hurricane evacuation or traffic safety and, consequently, are not acceptable alternatives to the project. FDOT can do nothing else to minimize the impacts of the project and still address the needs for the project. Minimization of wetlands impacts was accomplished to the greatest extent possible. FDOT has proposed mitigation to offset the impacts that could not be avoided. THE PROPOSED PROJECT - IN GENERAL STIPULATION AS TO DESIGN AND CONSTRUCTION Petitioners stipulated that the design and construction specifications of the roadway proposed to be permitted in this case comply with all applicable design and construction standards for structural integrity, and adequately describe the three-lane divided roadway proposed to be constructed on a four-lane roadbed/embankment. PROPOSED LANES, SHOULDERS, AND MEDIAN FDOT proposes to widen the roadway in the project area to a three lane divided roadway with two northbound lanes and one southbound lane, plus three passing zones. The proposed project will be constructed on a four lane roadbed embankment. FDOT does not presently have plans to add the fourth lane to this roadway. FDOT Exhibit 8 contains an accurate description of the proposed typical section of the roadway. The typical section will consist of two twelve-foot northbound lanes with a six-foot paved shoulder and a four foot stabilized area adjacent to the paved shoulder; a twenty-foot median consisting of a two-foot paved shoulder, sixteen feet of grass and a tri-beam guardrail in the middle as a separator; and one twelve-foot southbound lane with an eight-foot paved shoulder. The proposed typical section also includes a storm water management system that will be described in more detail below. The proposed typical section includes a clear zone thirty feet in width, which is adequate. THE THREE PASSING ZONES The existing passing zone located in Dade County between mile markers 113 and 115 is one mile in length. FDOT proposes to alter this passing zone to 1.44 miles in length. The existing passing zone located in Dade County between mile markers 120 and 122 is also one mile in length. FDOT proposes to alter this passing zone to 2 miles in length. In addition, FDOT proposes to construct a 1.5 mile long passing zone between mile markers 110 and 112 in Monroe County. If permitted, the proposed project will include 2 passing zones in Dade County and 1 passing zone in Monroe County, for a total of 3 passing zones. The total length of the passing zones will equal 4.94 miles. ELEVATION There are no plans to change the elevation of the existing roadway. HYDROLOGIC CULVERTS The project contemplates the construction of 25 hydrologic culverts north of the C-111 Canal. These culverts will remain capped until further hydrological studies are completed and input from all concerned regulatory agencies can be obtained. It has not yet been determined how these culverts will be utilized to maximize the improvement to the ecosystem north of the C-111 Canal. WILDLIFE CROSSINGS INCLUDING THE C-111 BRIDGE The project contemplates the construction of three wildlife crossings north of the C-111 Canal in Dade County with fencing designed to funnel wildlife through the crossing. These crossing, sometimes referred to in the record as “panther crossings” are located between mile markers 118-119, 122-123, and 126-127 and will be constructed as overland bridges. In addition, the replacement bridge over the C-111 Canal (located between mile markers 116-117 in Dade County) is intended to serve as a wildlife crossing and will also employ fencing to funnel wildlife through the crossing. All four of these structures will be constructed as four-lane bridges, but will be striped for three lanes with rumble strips on the southbound fourth lane to discourage vehicular traffic in that lane. There will be an eight foot outside shoulder. FDOT proposes to construct 18 culverts south of the C-111 Canal for crossings by crocodiles, alligators, manatees, and other wildlife. These crossings will consist of 15 box culverts and 3 bridges. MANATEE CREEK BRIDGE The proposed bridge at Manatee Creek would be constructed as a four lane bridge, but would be striped for three lanes with rumble strips on the southbound fourth lane to discourage vehicular travel in that lane. There would be an eight foot outside shoulder. BRIDGING JEWFISH CREEK AND LAKE SURPRISE Jewfish Creek, which is part of the Intracoastal Waterway, and Lake Surprise would be bridged by a continuous structure. The Jewfish Creek bascule bridge would be replaced by a high-level four-lane fixed bridge. The Lake Surprise causeway would be replaced by a low-level four-lane bridge. The total distance for this bridging is approximately 2.35 miles. AREA OF PROJECT THAT WILL BE OPERATED WITH FOUR-LANES The three passing lanes (4.94 miles) and the bridge over Jewfish Creek and Lake Surprise (2.35 miles) would be operated with four lanes. Those areas total 7.29 miles of the 20.4 mile project corridor. Approximately 43 percent of the proposed roadway would have four lanes of pavement. Excluding the areas where the fourth lane will be blocked from travel with rumble strips, only 35 percent of the completed project will contain four travel lanes. This area consists of the three passing zones and the bridges over Jewfish Creek and Lake Surprise. THE PROPOSED SWM SYSTEM The proposed project would provide for a SWM system consisting of inlets, culverts, swales, berms and dry/wet retention areas. For the typical roadway section, runoff from the paved roadway surfaces will be directed to roadside swales designed to provide retention for 50 percent of 2.5 inches times the impervious area. The SWM system for the bridges will collect runoff in inlets and culverts and direct it to either swales or dry or wet retention ponds. The berms of the SWM system provide additional protection by restricting spills of pollutants, such as petroleum from overturned tankers or other vehicle accidents, from running into the surrounding waters. The berms and swales of the SWM are designed to catch pollutants and prevent their discharge into the surrounding waters. FDOT Exhibit 18 consists of four separate drainage reports submitted to the District in 1995 in connection with the project, one report for each section of the project. The reports accurately document the drainage calculations, the drainage design, the rationale behind the drainage design, and compliance of the design with the laws and regulations of the permitting agencies for the original four-lane proposal. On or about September 5, 1995, FDOT submitted revised drainage calculations to the District, determining the amount of stormwater treatment for the three-lane project. The revised calculations established that at least 95% percent of all stormwater runoff from the project would be captured in the proposed SWM system. Because the swale design was based on the originally proposed four-lane road, retention will be in excess of the required volume for most sections of the roadway. The required retention volume for this project is approximately 166 percent of what is required by the BOR. The surface and subsurface geology of the roadway consists of Miami oolite limestone overlain with Perrine maral. Underlying this is Thompson formation, anastasia and Key Largo limestone. Based on these constituencies, the swales proposed by the SWM system would be effective in rapidly removing heavy metals and phosphorous. The revised calculations established that approximately five percent of the project area will not have a SWM system. These areas will not have a SWM system because properly-sized retention systems in those areas can not be constructed without causing a disproportionate, adverse impact to surrounding wetlands. FDOT has provided reasonable assurances that the proposed SWM system’s total water quality treatment exceeds the District's permitting requirements and provides sufficient treatment to exceed the BOR requirements. The water discharged from the proposed system would be of higher quality than that currently discharged, which is not treated. FDOT has provided reasonable assurances that the proposed SWM system complies with the permitting criteria found in Rule 40E.301(1)(a)-(p), Florida Administrative Code. The following findings are made as to that criteria. Rule 40E-4.301(1)(a), F.A.C. The parties stipulated that Rule 40E-4.301(1)(a), F.A.C., pertaining to flood protection and the adequacy of drainage, is not at issue in this proceeding. Rule 40E-4.301(1)(b), F.A.C. The quality of water being discharged from the SWM system will be of substantially higher quality than the existing discharges. Consequently, it is concluded that the system will not cause adverse water quality impacts within the meaning of Rule 40E-4.301(1)(b), F.A.C. In addition, the evidence established that there will likely be less water discharged from the roadway if the project is constructed because of the amounts of water that will likely be retained in the swales that are a part of the SWM systems. Rule 40E-4.301(1)(c), F.A.C. Because the receiving bodies of water are designated Outstanding Florida Waters, the District is required to apply the DEP's most stringent water quality requirements -- the antidegredation requirements for discharge to OFWs, to this project. Those standards will be discussed in more detail below. The evidence established that the proposed project will not violate those requirements. Rule 40E-4.301(1)(d), F.A.C. Impacts to sources of water are not at issue. The District reviewed the potential effect of the SWM system upon on-site and off-site impacts to surface or groundwater levels and flows. The evidence supports the District's conclusion that no adverse impacts will be caused. Petitioners failed to present any evidence on groundwater levels and flows. Consequently, it is found that the criteria found at Rule 40E-4.301(1)(d), F.A.C., has been satisfied. The 25 hydrologic culverts north of C-111 have the potential to re-establish historic surface water flow in the area. They were sized, based on rainstorm events, to help equalize water levels from one side of the road to the other. The culverts are capable of transferring water from west to east to assist in the historic restoration of flows. In order to assure the proper usage of the culverts, they will remain gated until the District develops a management plan in conjunction with other agencies. The District will determine the maintenance entity. The FKAA water main runs beneath this section of the road. As a result, there is no other more hydrologically efficient alternative for the placement of the culverts. The culverts would also provide a means for overwash from storm events, over the U.S. 1 roadbed, to flow back to its point of origin, stabilizing the roadbed and allowing release of the accumulated salt water. Rule 40E-4.301(1)(e), F.A.C. In addition to providing for a net improvement in water quality, the project will offset any adverse impacts through mitigation and other environmental enhancements for which no mitigation credits are being assigned, as described below. Rule 40E-4.301(1)(f), F.A.C. FDOT has a history of adequate maintenance of SWM systems, and has provided reasonable assurance that it has the staff and budget to comply with District operation and maintenance requirements. FDOT will also be able to comply with the District's requirements to control exotic plants and other foliage along project corridor. Rule 40E-4.301(1)(g), F.A.C. The SWM system will not adversely affect public health and safety. The dispute as to the public interest test focused more on the WRM permitting requirements. Findings as to the public interest test are discussed in more detail below. Rule 40E-4.301(1)(h), F.A.C. The evidence established that the SFM system is consistent with State Water Policy. Rule 40E-4.301(1)(i), F.A.C. This project does not pertain to a DRI and, consequently, this criteria is not applicable. Rule 40E-4.301(1)(j), F.A.C. There are no basin criteria applicable to this project. Rule 40E-4.301(1)(k), F.A.C. The evidence established that the SWM system will not be harmful to the water resources of the District. While there will be adverse environmental impacts caused by the project, those adverse impacts have, as will be discussed in more detail below, adequately offset by mitigation. Rule 40E-4.301(1)(l), F.A.C. This issue was not at issue in this proceeding. Rule 40E-4.301(1)(m), F.A.C. As will be discussed in greater detail in a subsequent section of this Recommended Order, the project is not against public policy. For the reasons set forth in that subsequent section, it is found that the project is clearly in the public interest. Rule 40E-4.301(1)(n), F.A.C. Rule 40E-4.091(1)(a), F.A.C., constitutes the BOR. As discussed in detail above, the SWM system complies with the BOR. Rule 40E-4.301(1)(o), F.A.C. There are no isolated wetlands pertaining to this project. Rule 40E-4.301(1)(p), F.A.C. There are no above ground impoundments, as described in Appendix 6 of the BOR, pertaining to this project. WATER QUALITY - DISCHARGES INTO OFW Because the project will involve discharges into Outstanding Florida Waters, it was necessary for FDOT to establish that the discharges from the SFW system will not degrade those OFWs. The evidence established that FDOT's proposed project complies with and exceeds applicable water quality standards and permitting criteria. There will be no significant degradation of ambient water quality as a result of the project. It is expected that there will be a net improvement in ambient water quality resulting from the proposed project, as opposed to the continued degradation if nothing is done to treat stormwater runoff. In FDOT Exhibit 46, FDOT provided baseline water quality data in the form of STORET data for waters adjacent to the project area. STORET is a centralized repository and database for water quality data throughout Florida. It is Florida's principal source of water quality data. STORET contains the best scientific database on water quality in Florida. The STORET data set forth in FDOT Exhibit 46 provided sufficient evidence on ambient water quality for the waters adjacent to the proposed project. In addition to providing the water quality data in FDOT Exhibit 46, FDOT is required by Special Permit Condition 37 to submit appropriate water quality data in the surrounding waters prior to any construction activities. SFWMD Exhibits 5 and 6 contain amendments to Proposed Agency Action made after the beginning of the formal hearing. These amendments include a requirement that an appropriate water quality monitoring plan be submitted within 30 days of the permit issuance. FDOT has provided reasonable assurances that water quality standards will be met and that there will be appropriate water quality monitoring during construction. DIRECT IMPACTS OF THE PROJECT The proposed roadway design will result in the following direct impacts to wetlands adjacent to the roadway corridor: 1) the dredging of 11,028 cubic yards of material from 2.1 acres, 2) the placement of 1,689,553 cubic yards over 147.0 acres of wetlands, and 3) 6.9 acres of (potential) permanent impact due to shading and 4.1 acres (potential) of temporary impacts from the Jewfish Creek Bridge construction activities to seagrass habitat. In order to determine the project's direct impacts, the area surrounding the project was surveyed to determine the number of affected acres. This was done by using a computer aided design ("CAD") system, and by categorizing the various forms of wetlands and associated flora and fauna into the following communities: mangrove, emergent freshwater, open water, and tidal, consisting of seagrass and non-vegetated bottoms. Using these categories and the CAD system, every square foot of direct impacts were accounted for. The adverse direct wetland and surface water impacts of this project are as follows: 1) 27.83 acres Non- Vegetated Tidal Bottom; 2) 11.27 acres Seagrasses; 3) 46.85 acres Mangroves; 4) 42.35 acres Sawgrass/Cattail/Spikerush; 5) 14.31 acres Shrub Wetlands; and 6) 6.46 acres Open Fresh Water; totaling 149.07 acres. Though some wetlands to be impacted may be of lesser quality, FDOT stipulated that all wetlands to be directly impacted by the project should be considered to be high quality wetlands for the purpose of mitigating the impacts. The impacted wetlands are part of larger wetland systems. Petitioners assert that the District should have required studies as to impacts as to the larger wetland systems. The evidence established that the District appropriately considered the type and location of the wetlands involved so that additional study suggested by Petitioners was unnecessary. Petitioners also assert that impacts to isolated wetlands should have been studied. The evidence established that there will be no such impacts. SECONDARY AND CUMULATIVE IMPACTS RECOGNIZED BY SFWMD In addition to the direct impacts of the project, the District is required to analyze secondary and cumulative impacts. A project's secondary impacts are those that, though outside of the project footprint, are very closely linked and causally related to the project. This is a "but for" test. Secondary impacts are those impacts which, if not for the proposed project, would not occur. Both positive and negative secondary impacts are considered. When there are both positive and negative secondary impacts caused by a project, the permitting agency must consider the severity of the impacts and balance these together with the other factors in the public interest test to determine whether or not the project is clearly in the public interest. WRM statutes, and DEP rules and policies pertaining to those statutes do not regulate growth or traffic increases, per se. Only if such increases are very closely linked and causally related to the project will they be considered. The District identified several secondary impacts that would be temporary in nature since they would occur while the project is being constructed. One is the use of a barge facility, primarily at Jewfish Creek, where the anchoring of the barge may result in temporary impacts to seagrass during construction. This impact is addressed by a component of the seagrass mitigation at Boca Chica, discussed below. Another impact is turbidity associated with the dredge and fill and the barge activities. That issue is appropriately addressed by permit conditions, through the use of turbidity control screens and other techniques. The District also identified secondary impacts directly associated with the project footprint that would be permanent in nature. The removal of the exotic vegetation potentially opens up the areas adjacent to the road north of the C-111 canal to off-road vehicles or four-wheel driving and the potential impacts caused by those vehicles. That impact is appropriately addressed by fencing north of the C-111 canal. When a road is widened, animals have a greater distance to travel back and forth from one side of the road to the other. A wider road exposes such animals to greater risk of being hit by a motor vehicle while crossing the road. That impact is addressed in this project by the fencing, the wildlife crossings, and the wildlife box culverts. The crossings are designed for large mammals and some species, such as the Indigo snake, will likely not use these crossings. The wildlife crossings will not entirely mimic the crossing patterns of all wildlife that need to cross U.S. 1 and will result in some wildlife habitat fragmentation. The fencing that will be erected to funnel wildlife through the crossings will fragment the habitat of some species by altering wildlife crossing patterns and blocking access of some species to certain areas of habitat. The greater weight of the evidence established that any habitat fragmentation should, when compared to existing conditions, be minimal. The District appropriately evaluated the advantages and disadvantages of using wildlife crossing and hydrological culverts and appropriately concluded that there would be a net benefit to wildlife as a result of their construction. The District properly concluded that the culverts, bridges and fencing located south of the C-111 canal, construction of wildlife crossings and fencing north of the C- 111 canal, construction of the hydrologic culverts, and removal of the Lake Surprise Causeway are positive secondary benefits of the project. These benefits should be considered when applying the public interest test. THE FKAA PIPELINE RELOCATION The project requires the relocation of two segments of the existing pipe owned by the Florida Keys Aqueduct Authority (FKAA) around Jewfish Creek Bridge. The segments total approximately 1.5 miles. The District inspected the area where the pipeline will be relocated to assist in determining its impact. The pipeline relocation is a temporary disturbance during construction. It is a small linear facility, which will not generate pollution in and of itself. The pipeline relocation is not expected to result in a violation of State water quality standards. The FKAA is responsible for obtaining the necessary permits for the relocation. Direct impacts to wetlands will occur in a 4 to 5 foot wide strip along the length of the relocated aqueduct. The FKAA has submitted a permit application to the DEP for a permit to relocate the aqueduct. DEP believes that adequate mitigation can be achieved to make the project permittable. Once the FKAA submits an adequate mitigation plan, then relocation of the aqueduct will not be an adverse secondary impact caused by the U.S. 1 project. The permit for the subject project should contain a condition that the FKAA obtain a permit for the relocation of these two segments of its pipeline. THE C-111 BOAT RAMP There is an existing boat ramp designed for small boats to access District canals that is located on the north side of the C-111 canal. As a result of the proposed project, it will be relocated to the southern side of the project. This relocation is a relatively minor project requiring a cut in the canal bank and a fourteen-foot wide slab for the boat ramp. When the District considered the potential impacts associated with this relocation in conjunction with the impact of the proposed project, it was determined to be a relatively insignificant impact in terms of the project as a whole. Relocation of the boat ramp is not expected to result in a violation of state water quality standards. All direct, cumulative, and secondary impacts, whether positive or negative, should be considered in balancing the public interest test. ARE THERE ADDITIONAL SECONDARY AND CUMULATIVE IMPACTS Petitioners assert that there are additional cumulative and secondary impacts that the District failed to consider. Petitioners argue that the project cannot meet permitting criteria if those additional impacts are considered. The additional impacts pertain to additional development throughout Monroe County because of the “rate of growth ordinance” (ROGO), additional development along the project corridor, impacts to the coral reefs of the Keys, impacts to Key Deer, generalized impacts, and impacts from increased number of “day trippers." For the reasons discussed below, it is found that the District has considered all appropriate direct, secondary, and cumulative impacts of the project. The additional impacts that Petitioners assert should have been considered are not causally connected or directly linked to the project. THE RATE OF GROWTH ORDINANCE Monroe County adopted its Year 2010 Comprehensive Plan (the "Plan") to meet the requirements of Chapter 163, F.S. The Plan, adopted May 15, 1993, is unusual in that the County limits future growth based on a carrying capacity analysis of its hurricane evacuation clearance time. No other jurisdiction in Florida, and few others in the United States, have used a carrying capacity planning approach. To implement the carrying capacity limitation, Monroe County determined the total number of dwelling units that could be permitted while maintaining an acceptable hurricane evacuation clearance time of 24 hours. This number of dwelling units, less an allowance for vested development and development in municipalities, was the basis for a ROGO that was adopted by the County in 1992. The ROGO allocates the available units at a uniform annual rate of growth (currently, 255 units per year). The ROGO regulates all proposed new residential buildings, including hotels, motels, and other transient tourist accommodations as well as permanent residences. The number of building permits that Monroe County can issue is, at present, directly related to how rapidly the County can be evacuated in the event of a hurricane. The lower the clearance time, the greater the number of permits that can be issued. The Comprehensive Plan requires that the County be able to evacuate within a 24-hour period. As of March 7, 1995, the hurricane evacuation time for Monroe County was determined to be 21.25 hours.1 The project is expected to reduce by six or seven hours the modeled hurricane evacuation capacity for Monroe County, regardless of whether it consists of three or four lanes. This is because both the three lane and four lane plans provide for two northbound lanes. Because of the rate of growth provisions in county law, this reduction of clearance times results directly in an increase in the number of building permits that the county can issue annually. Under ROGO, Monroe County can, with this project, issue 255 permits each year through the year 2026. Without this project, Monroe County can issue 255 permits each year only through the year 2001. Alternatively, without this project, the county can issue 88 permits each year through the year 2010 if it chooses to issue permits over a longer period of time. Following extensive litigation before the Division of Administrative Hearings in an unrelated proceeding2, the Administration Commission entered a final order on December 12, 1995, that approved approximately 97 percent of the Plan. In addition, the Administration Commission has published a proposed rule to bring the remainder of the Plan into compliance and assure its financial feasibility. The central feature of the proposed rule is a five- year work program, with annual reviews by the Administration Commission. It is likely that the proposed rule will eventually result in the complete revision of the ROGO. The proposed rule provides that Monroe County's annual rate of growth be revised within five years, no later than December 31, 2001, "to establish a rate of growth and a set of development standards that ensure that any and all new development does not exceed the capacity of the county's environment and marine systems." A carrying capacity study will comprehensively assess water quality, habitat protection, and public facility issues to determine the capacity of the Keys to sustain further development. The proposed project is but one of many factors that will be considered in future rate of growth regulations. If the expected revisions occur, it would be speculative to predict what development would be allowed. While the studies are underway the rate of growth will remain at 255 units per year. The rate of growth will be reviewed annually, and may be reduced a minimum of 20% if the goals of the studies are not being met. The DCA has determined that Monroe County’s Comprehensive Plan and its land development regulations are sufficient to prevent or mitigate any potential adverse secondary impacts of the project caused by development. The DCA has consistently supported the proposed project, even in its earlier four-lane configuration, because it was consistent with Monroe County's 1986 Comprehensive Plan, and because the project would improve hurricane evacuation clearance times and improve water quality in the vicinity of the roadway. The 1986 plan supported widening of the roadway to four lanes based on projected travel demand. The DCA prefers the current, three-lane proposal to the earlier four-lane. On September 7, 1995, the Monroe County Commission adopted Resolution 315-1995 in support of the proposed project because "it balances the needs for a widened highway with safeguards designed to address secondary impacts." Lorenzo Aghemo, an expert in comprehensive planning, served as Monroe County Planning Director during the development of the Plan and ROGO. In Mr. Aghemo's opinion, the widening of the roadway to either three or four lanes would generate minimal growth pressure in Monroe County, particularly because the Plan limits the rate of growth. Because the Keys are designated by Section 380.0552, F.S., as an area of critical state concern, the DCA is charged with oversight of Monroe County's Comprehensive Plan, its LDRs, and all development that takes place in Monroe County. Additionally, the Administration Commission may amend Monroe County's plan or regulations by rule (See Section 380.0552(9), F.S.). There is virtually no action that Monroe County can take related to the use of land without review and approval of a state agency. The Administration Commission’s proposed rule demonstrates its intent to revise comprehensively Monroe County's ROGO within five years to ensure that future development does not exceed the capacity of the Keys' environmental resources. It also demonstrates the Administration Commission's intention to closely monitor growth and development in the Keys during the five-year study period. Some of the studies required by the proposed rule are already underway: 1) the DCA has entered into a contract with the ACOE to complete the environmental carrying capacity study; 2) the HRS study of advanced on-site waste water treatment systems is underway; 3) Monroe County is developing the required Marathon central sewer facilities plan; and 4) Monroe County and HRS have begun the cesspit identification and elimination process. Caution should be exercised in relying on this or on any other proposed rule. Likewise, caution should be exercised in relying on changes to ROGO that may or may not occur. It is likely that the present status of the law will be changed in the near future so that future development will be based on environmental carrying capacity as opposed to hurricane evacuation clearance times. However, for the purposes of this proceeding the District should accept the fact that the issuance of future building permits is closely linked and causally related to the project. Consequently, it is found that under the present status of the law, the issuance of additional building permits in Monroe County is closely linked or causally related to the project. MONROE COUNTY LDRS AND DCA OVERSIGHT Although Petitioners established that there is a causal relation between the project and the existing status of the law governing the number of building permits that can issued in the future, the evidence was insufficient to establish at a level above speculation that adverse environmental impacts will result because of the issuance of those building permits. The Monroe County Comprehensive Plan contains land development regulations that govern all development in Monroe County. These regulations are among the most stringent in the State and are designed to avoid or minimize adverse environmental impacts caused by development. All development orders in Monroe County are closely scrutinized by the Department of Community Affairs to ensure compliance with applicable permitting criteria. Those regulations and the DCA’s close scrutiny are intervening factors that break any causal relation between the project and the speculative adverse environmental impacts that the Petitioners assert will be caused by future issuance of building permits by Monroe County. Petitioners failed to establish that the impacts of future development are very closely linked or causally related to the project. Consequently, it is found that such impacts are not secondary or cumulative impacts of the project. DEVELOPMENT ALONG THE PROJECT CORRIDOR A major portion of the area next to the road has little or no development potential because it is either water, land in public ownership, or land slated for public ownership. The areas east of the road are mostly in private ownership, but are primarily submerged lands and mangrove areas. The Crocodile Lakes National Wildlife Refuge is federally owned and is managed by the U.S. Fish and Wildlife Service (USFWS). The Southern Glades lands, located immediately west of the project and Everglades National Park (ENP) in Dade County, have been acquired by the District and are managed by the Florida Game and Freshwater fish Commission (FGFWFC). The Model Lands Basin in Dade County is in private ownership but proposed for public acquisition in the future. The land adjoining the roadway in Dade County is designated as open area or environmentally sensitive. Almost half of the land along Monroe County's portion of the roadway is in public ownership. At least 90% of the land in private ownership is mangroves or wetlands that cannot be developed. The small area of uplands is currently being used by a resort marina which will not be allowed to develop further under the new comprehensive plan. There is very little potential for future development in the project area. The comprehensive plan designation for areas in Dade County are open space, and the ones in Monroe County have the conservation designation. The District's regulatory programs consider areas adjacent to the project as sensitive wetland habitats. Based on the District's regulatory authority and comprehensive plan designation for those lands, which would have to be obtained prior to obtaining a permit for development, it is very unlikely that those lands could be developed. Florida Rock and Sand Co. (FRS) has a permit to mine approximately 1,100 acres of wetlands. As part of its mitigation program, FRS will donate this land to the District once its mining and mitigation projects are complete. The FRS mitigation lands are preserved as a permit condition and will ultimately be transferred to the District. This land will not be developed. In addition, the District established that the U.S. 1 project and the FRS project do not constitute a cumulative impact that the District failed to consider. The evidence established that development along the project corridor will not be a secondary or cumulative impact of the project. IMPACTS ON CORAL REEF SYSTEM The evidence was insufficient to establish a close link or causal connection between the project and the coral reef system. As reflected elsewhere, it is found that there will be no degradation of ambient water quality as a result of the project. Therefore, there is no need to resolve the conflicting testimony as to the present status of the coral reef system. IMPACT ON KEY DEER There are no key deer in the project area. The nearest key deer habitat, Big Pine Key, is approximately 70 miles from the southern terminus of the project. The evidence is insufficient to establish that there is a very closely linked and causally related connection between the project and key deer mortality on Big Pine Key. GENERALIZED IMPACTS The Petitioners presented certain opinion testimony that the Keys cannot be developed in an environmentally sensitive manner because of potential adverse impacts of new development in Monroe County, or new boats operating in the waters of the Florida Keys. The credibility of that testimony need not be evaluated because the evidence was not sufficient to tie those generalized concerns into the specific regulatory criteria of the permitting agency. There was insufficient evidence to establish that those alleged impacts would be very closely linked or causally related to the proposed project. DAY TRIPPERS Induced demand is new travel that occurs solely because additional capacity is added to a highway. Petitioners' transportation experts, Michael Replogle and Robert Morris, testified that FDOT's traffic studies, and FDOT's projected rate of traffic growth of approximately 3 percent annually, are incorrect because the studies do not predict the amount of "induced demand" that would result from the proposed project. Petitioners assert that induced demand would generate an unknown number of people who drive to the Keys for the day from south Dade County, referred to as “day trippers,” will have an impact on the Keys that has not been evaluated. The assertion that this potential impact has not been analyzed is rejected as being contrary to the greater weight of the evidence. Induced demand is accounted for in Monroe County's Long Range Transportation Plan, which was never evaluated by Mr. Replogle or Mr. Morris. The Long Range Transportation Plan was prepared by an experienced traffic engineering consulting firm, Barton-Aschman, using an FDOT- approved traffic demand model, the FSUTMS model, that includes all traffic generators and attractors, and all travel on U.S. 1 on weekdays and weekends. The FSUTMS model does not restrict demand based on the existing road capacity. The model uses an "unrestrained assignment" that incorporates the total predicted trip generation on recreational facilities, hotels, and all other attractors. The Long Range Traffic Plan was used to develop the Monroe County Comprehensive Plan, which takes into consideration the projected increases in traffic and makes appropriate provisions for those increases. FDOT has provided reasonable assurances that it has properly projected the amount of traffic for the project corridor after the project is completed and that the projected increases have been appropriately addressed by Monroe County's Comprehensive Plan. MITIGATION - IN GENERAL For the reasons discussed above, it is found that there are no secondary or cumulative impacts that the District failed to consider. Petitioners also contend that the mitigation proposal is insufficient to offset the direct and secondary impacts recognized by the District. This is a large dredge and fill project that will permanently fill 149 acres of wetlands. The wetlands that will be adversely impacted by the project include OFWs that provide a great variety of functions and serve as habitat for fish and wildlife, including threatened and endangered species. The wetlands are unique and of high quality. Mitigation for direct, secondary and cumulative impacts was considered as part of the permit evaluation. In- kind mitigation is considered to be most effective, but out- of-kind mitigation may be offered by the applicant where it is impractical to conduct in-kind mitigation due to historic changes in the project area or sensitivity of the habitat type for which mitigation is offered. Such mitigation is also appropriate to address regional alteration of an ecosystem, such as the Everglades ecosystem alteration caused by the original roadway embankment. FDOT developed a conceptual mitigation plan that took into account project impacts on the freshwater, marine and estuarine components of the ecosystems involved, as well as the impacts on threatened and endangered species of wildlife which may be affected by the project. FDOT coordinated the plan's development with the National Parks Service, U.S. Fish and Wildlife Service, the Army Corps of Engineers, the National Marine Fisheries Service, the U.S. Environmental Protection Agency, the Dade County Department of Environmental Resources Management, the Florida Game and Fresh Water Fish Commission, and the Florida Department of Environmental Protection. The conceptual mitigation plan evolved as a result of project modifications and agency comments into what is now proposed as mitigation for the project. The current proposal is summarized in FDOT Exhibit 26, consisting of Attachment H to FDOT's SWM and WRM permit applications. The timing of their construction falls into two general categories: mitigation previously permitted and concurrent mitigation. UPFRONT MITIGATION Typically, mitigation is done concurrently with project construction rather than prior to permit issuance. Mitigation is often done afterwards because of construction timing constraints. Here, FDOT applied for and, in May 1994 received, permits to conduct mitigation prior to applying for the permits at issue, with the understanding that performance of these activities does not require the District to issue permits for the proposed projects. A total of 385.22 acres of mitigation has already been completed. The applicant received 203.02 mitigation credits from the District on May 12, 1994, for several mitigation projects that the applicant proposes to apply to the proposed U.S. 1 widening project provided it is approved. Table 2 of Attachment H to FDOT Exhibit 26 sets forth the four mitigation projects that constitutes the up- front portion of the mitigation for the project. This table sets forth the acres mitigated, the conversion factor for the mitigation, and the resulting mitigation credit awarded. The four mitigation activities already authorized are: enhancement of the wetland habitat in the Harrison Tract located adjacent to Barnes Sound within the Crocodile Lakes National Wildlife Refuge on the north end of Key Largo (70.37 acres credit for 252.6 acres of restoration); removal of the spoil mounds on the eastern bank of the C-111 canal east of U.S. 1 located on the District’s ROW (10.65 acres credit); the back filling of the C-109 canal levee located on the District ROW within the Southern Glades Save Our River project (112.7 acres credit); and the removal of the roadside spoil mounds on the west side of U.S. 1 located between C-111 and the Dade Work Camp Road within the District’s Southern Glades Save Our Rivers Project (9.30 acres credit). The mitigation projects pertaining to the roadside spoil removal along U.S. 1, the backfill of the C-109 Canal, and the removal of spoil along the C-111 Canal are similar projects because they each involve existing deep ditches cut through wetlands. When these deep ditches were cut, the spoil material from the ditch was deposited alongside the ditch. This resulted in areas that were previously Everglades wetlands becoming spoil, supporting the growth of exotic species and, for the most part, not exhibiting wetland functions. FDOT is proceeding with the backfilling the C-109 canal located between mile markers 122.5 and 117, and removal of the corresponding spoil mounds created during construction of the C-109 canal. In connection with this mitigation, marsh areas, tree islands and deep water aquatic refugia have been restored. In this area, there has been considerable attraction of wildlife subsequent to restoration, including otters, alligators, and turtles, which could not previously use the habitat because the canal was too deep. Upon completion waterflow between the east and the west will be restored, and the area will be restored to a wetland habitat from its current uplands habitat type. Backfilling of the C-109 canal is part of an interagency effort with the ACOE to restore as closely as possible to natural conditions the flow of water in the C-111 watershed area. C-111 mitigation includes removal of roadside spoil along the C-111 canal to restore the natural condition of the area. The mitigation was devised in coordination with the National Maine Fisheries Service (NMFS), which required mitigation for non-vegetated habitat types. Restoration also includes preserving some spoil areas as islands to maintain habitat for endangered species of plants. When the C-111 spoil mounds are scraped down, the fill will not fill the whole ditch. The ditch will, therefore, be a bit more valuable but will not be completely restored to its former elevation. FDOT will also remove roadside spoil along the west side of U.S. 1, upon which exotic species of plants had grown, and returning the area to its original grade. The Harrison Tract is a known habitat and nesting area for American crocodiles. Its wetlands functions were altered or eliminated by prior development of the land by its original owners. Restoration includes regrading the area to restore its original wetlands functions, including habitat for young and adult crocodiles. FDOT's mitigation of the Harrison Tract also includes restoration of tidal flushing to increase contributions of nutrients and food sources to the surrounding tidal bay system. Crocodiles have been observed using the restored areas. FDOT has installed additional nesting berm habitat, basking habitat and shallow lagoon habitat to promote juvenile crocodile development. The District established that the credit awarded for this mitigation and the conversion ratios utilized for determining this credit were consistent with agency practice and its pertinent rules. FDOT was given a 1:1 credit ratio for areas involving full restoration of wetlands. In other portions of the Harrison Tract mitigation involving restoration of flushing to existing wetlands, FDOT was given not full credit, but credit based on the severity of limitation of the existing wetland functions. Based on this evaluation, mitigation credits were given in a range of a 3:1 ratio for restoration of severely disrupted or non-existent wetlands to a 20:1 ration for restoration of higher quality but not fully functional wetlands. FDOT is being awarded 70 mitigation credits for the 252 acres in the Harrison Tract that are being restored or enhanced. CONCURRENT MITIGATION Based on the mitigation ratios developed by the District, additional mitigation credits were required. Consequently, the project contemplates mitigation that will be undertaken concurrently with the construction of the project in addition to the upfront mitigation. FDOT proposes to earn these additional credits by projects involving creation and/or restoration of emergent vegetation, mangrove and seagrass habitats. FDOT’s proposal to mitigate mangrove impacts with "out of kind" mitigation of emergent vegetation habitats was viewed by the District as being necessary and appropriate because there were no sufficiently large areas of mangrove habitat suitable for restoration. Table 7 of Attachment H to FDOT Exhibit 26 sets forth the four mitigation projects that constitutes the concurrent portion of the mitigation for the project. This table sets forth the acres mitigated, the conversion factor for the mitigation, and the resulting mitigation credit awarded. In addition, the table references certain credit for the placement of the hydrological culverts. As will be discussed later, that credit was withdrawn at the formal hearing. The four mitigation activities that will constitute the concurrent portion of the mitigation plan are: the removal of the Lake Surprise causeway (2.90 acres credit); the scrape down of the Jewfish Bridge approaches (0.67 acres credit); the restoration of the FGFWFC road (10.34 acres credit); and the Boca Chica project (27.17 acres credit) The Lake Surprise Causeway removal mitigation involves 5.26 acres of on-site seagrass restoration and 0.54 acres of unvegetated bottom mitigation through the excavation of 52,220 cubic yards of material. Lake Surprise historically was a shallow tidal lake supporting seagrasses before a causeway was built across the lake over the seagrasses. FDOT proposes to remove the causeway and restore the previous elevation, after which it is anticipated that seagrasses that grow on the east side of the causeway will fully recruit naturally to the excavated area. Removing the Lake Surprise Causeway will establish 5.26 acres of seagrass, for which FDOT received 2.63 acres of on-site mitigation credit based on a 2:1 ratio. Through natural recruitment after removal of the causeway, there is a high likelihood that the entire 5.26 acres will recolonize with seagrass. FDOT minimized the seagrass impacts to the greatest extent possible. The mitigation credit pertaining to Lake Surprise does not include credit for the removal of the causeway itself. This awarded credit is for the restoration of seagrass areas. The mitigation pertaining to the Jewfish Creek Bridge approaches proposes the scrape down of 1.33 acres of existing fill to allow the area to become recolonized with mangroves. Boca Chica is located in southern Monroe County over one hundred miles from the southern terminus of the project. This site was chosen by FDOT as a site for seagrass mitigation project after FDOT reviewed several other potential sites. Two other sites were rejected. The area around the C- 111 canal was rejected because the land proposed for use was in private ownership. Several defunct marinas in Port Bougainville were rejected due to poor conditions not conducive to seagrass growth. Boca Chica was finally chosen as the site because it was a large enough area with light and hydrological flow conditions conducive to seagrass growth. The evidence establishes that the Boca Chica site is the most viable for seagrass mitigation. The seagrasses to be impacted at Lake Surprise are healthy and productive turtle grass, manatee grass and cuban shoalgrass. Turtle grass is considered an extremely valuable “climax community” of seagrasses which hold sediments in place, cleanse water quality, and forms the base of the food chain. It is valuable to sea turtles, manatees and recreationally important fish and shellfish. The cuban shoalgrass that will colonize at Boca Chica is a pioneer colonizer species that grows in disturbed areas. It is not as valuable to the marine system as turtle grass. The Boca Chica seagrass mitigation permit condition proposed to offset impacts to 11.27 acres of seagrass. This will involve the removal of 306 cubic yards of sediment and hydraulically dredging approximately 1,175 cubic yards of spoil material. The proposed permit conditions state that FDOT shall provide future maintenance of the culvert areas to maintain adequate flushing. FDOT will plant 25.92 acres of seagrasses to mitigate for the remaining 8.64 acres of impacts, for a mitigation ratio of 3:1. In addition, 8.46 acres of seagrass will be planted to mitigate for the barren bottom area that will be affected, and 1.62 additional acres will be planted to compensate for any unexpected impacts to Boca Chica based on the necessary improvements. Overall, there will be of 36 acres of seagrass mitigation by FDOT, for which FDOT is receiving 27.17 acres credit. FDOT will also increase the water flow between the east and west lagoons of Boca Chica, and maintain the culverts connecting the two sides, in order to further promote growth of seagrass therein. FDOT is responsible for 80% survival of each acre of seagrass mitigation, as well as monitoring once a year for five years. Based on historical data obtained from Boca Chica during past mitigation efforts, there is a high likelihood that the entire 36 acres of mitigation will survive, and that the remaining 74 acres of the Boca Chica lagoons will experience natural recruitment of seagrass as a result of FDOT's efforts. The FGFWFC access area was built by excavating a ditch, and putting fill on the wetlands and creating a dirt road bed. After the C-109 canal is backfilled, the access road will no longer be needed. The mitigation project will excavate the existing road bed, back fill it into the ditch, thereby recreating the wetlands that were there previously. FDOT will receive 10.34 mitigation credits based on a 1:1 ratio of acres restored. EVALUATION OF MITIGATION There is no mitigation in this permit for any wetland impact beyond the direct loss of the specific 149 acres that will be dredged or filled. Mitigation was provided only for the direct, footprint impacts of the project. None of the up front mitigation involves the creation of wetlands, which entails converting areas that were not previously wetlands or open water and turning them into wetlands. It will likely take between 20 and 50 years for the mitigation areas to achieve full functional value required by the South Florida Water Management District mitigation permit. In the interim, there will be a net loss of wetland functional value. With time, the proposed mitigation has a high likelihood of success. Based on FDOT's past successes in mitigation of construction-related impacts, FDOT is able to comply with permit conditions relating to best management practices associated with the construction of bridges and pilings and turbidity screens around road construction, as well as restoration of seagrasses and mangroves. Petitioners assert that the District erred in determining the credit to be given for the up-front portion of the mitigation. While it is true that the SFWMD Rules do not mention "up-front" mitigation, the District has the authority to consider all aspects of a mitigation project in weighing its relative value. Consulting engineering inspectors have been retained by FDOT to insure that all permitting requirements are met during mitigation and construction, and that the technical special provisions for protection of threatened and endangered species are complied with by FDOT. The proposed permits contain appropriate conditions that require FDOT to monitor and maintain the mitigation areas. FDOT will be responsible in perpetuity for maintaining the tidal flushing connection at the Boca Chica mitigation site. Special permit condition 6 to the SWM and WRM staff reports require wetland and upland monitoring. If wetland and upland monitoring or other information demonstrate that additional adverse impacts have occurred due to this project, FDOT would be required to offset the loss of any additional wetland impacts. MITIGATION IS APPROPRIATE The evidence established that the mitigation projects were fairly and appropriately reviewed by SFWMD and that the mitigation credits were fairly and appropriately awarded. The evidence also established that there is appropriate mitigation for the direct, secondary, and cumulative impacts of this project. ACTIVITIES NOT RECEIVING MITIGATION CREDIT Mitigation credits for the 25 hydrologic culverts north of C-111 were originally included in the permit staff reports. Those mitigation credits were removed in an addendum to the staff reports, introduced as District's Exhibits 5 and 6. These credits were not necessary to offset project impacts. After the staff report was issued, they became a point of contention by the Petitioners because they will not be utilized until a management plan is developed. Since they were not necessary to meet mitigation requirements, the credits were removed from this project. These credits were never included in the mitigation ratios for these permit applications. The addendum removed the 9.6 credits initially contemplated for the culverts. No credit has been awarded for the relocation of threatened and endangered species of plants, such as Joewood and Bay Cedar by FDOT from the C-111, C-109 and roadside spoil mitigation areas. These species have been relocated to tree islands constructed by FDOT on the mitigation sites, or to other areas that would not be impacted by the project. FDOT also was not given mitigation credits for: (1) the wildlife crossings and the fencing that will funnel wildlife through these crossings; (2) installation of pipe culverts north of the C-111 canal and bridges and box culverts south of C-111; and which, in addition to providing a corridor for aquatic species, will increase the tidal flushing of the area; (3) the removal of the Lake Surprise Causeway, which will restore historical hydrological flow between the eastern and western sides of Lake Surprise; (4) FDOT's commitment to improve and maintain the flushing of the west lagoon culverts in Boca Chica (mitigation is in the east lagoon); and (5) FDOT's contribution of $300,000 to assist Monroe County in performing a carrying capacity study for the County. Additionally, FDOT will preserve the Jewfish Creek Bridge abutment, which will be preserved for local historical purposes. FDOT will prepare the Jewfish Creek Bridge pilings for an artificial reef at Long Key during construction. THE PUBLIC INTEREST TEST It is appropriate for the SWFMD to consider, in balancing the public interest test, to consider traffic safety and hurricane evacuation.3 Because of FDOT's expertise in those areas, it is appropriate for the permitting agency to give great weight to highway safety concerns, including hurricane evacuation, presented by FDOT. The application of the public interest test does not involve consideration of non-environmental factors other than those expressly set forth in the statutes such as navigation or preservation of historical or archaeological resources. Specifically, aesthetics, quality of life, the potential for a project to cause increased crime, and school overcrowding are not properly considered within any of the seven factors contained in Section 403.918(2)(a), Florida Statutes (1991). The District concluded that the project is clearly in the public interest based upon consideration and balancing of the following factors: hurricane evacuation improvements, public safety improvements, a SWM system where no SWM system currently exists; wildlife crossings and fencing north of the C-111 canal where no such crossings or fencing currently exist; wildlife box culverts to accommodate crocodiles, alligators, manatees and marine life where no such culverts currently exist; and hydrologic culverts, which have the potential to assist in the restoration of hydrologic flows, and the mitigation projects, both upfront and concurrent. SECTION 403.918(2)(a), FLORIDA STATUTES Section 403.918(2)(a), Florida Statutes, requires the permitting agency to determine “[w]hether the project will adversely affect the public health, safety, or welfare or the property of others." The property of others is not at issue. As discussed below, the evidence clearly established that the project will greatly enhance the safety of the road during normal operations and facilitate evacuation in the event of a hurricane. There will be clear benefits to the public safety as a result of this project. As part of the PD&E process, FDOT, through Metric, prepared "A Safety Evaluation" of the existing roadway. The safety analysis was based on FDOT accident statistics for the years 1983-1988, as well as engineering review of the conditions causing the accidents. Specifically, FDOT based their safety analysis on the following: 1) calculation of the abnormally high accident rate on the roadway based on the rate quality control formula set forth in the FDOT Highway Safety Improvement Guidelines, and approved by the Federal Highway Administration; 2) copies of the actual crash reports filed with the Florida Division of Highway Safety and Motor Vehicles, which provided detail greater than that generally available through FDOT's own accident data reports, and which formed the basis of the collision diagram in the Safety Evaluation (FDOT Exhibits 36; and 3) and its August 1996 update thereto (FDOT Exhibit 41), on-site evaluation and review of the roadway to determine geometrics of the roadway, locations of driveway accesses and side roadways and the degrees at which roadways intersected. Metric prepared an update of the Safety Evaluation for the years 1989-1994, to determine the continuing validity of the Safety Evaluation, as well as to review alternative proposals to the original proposed roadway configuration. In preparing the update, the recent accident data (FDOT Exhibit 37) and the underlying research in the Safety Evaluation were used by Metric Engineering in reaching its conclusions. The Safety Evaluation performed by Metric in 1989 established high accident rates on the roadway based on a detailed segmental analysis of the roadway. In August of 1996, the Safety Evaluation was updated by Metric, which update confirmed the findings of the Safety Evaluation, and further stated that accident frequency on the Monroe County portion of the roadway exceeded the state average accident rate and the abnormally high accident rate for the years 1990 through 1994 (notwithstanding the rear-end accidents occurring at Jewfish Creek). Fatal accidents on the Dade County portion exceed the state average on the same stretch by 37 percent for the same years. The most severe accidents occur on the Dade County portion. The Monroe County portion of the roadway exceeds the statewide average in the abnormally high accident rate four out of the last five years that FDOT studied. The Dade County portion does not exceed the accident frequency or the number of accidents, but the fatality rate in Dade County is much higher than the state average. Presently an abnormally high accident rate exists in three locations along the project corridor, two of which are in the vicinity of the Jewfish Creek bridge. The third location is north of the bridge on Cross Key. Replacing the Jewfish Creek Bridge with the fixed-height bridge proposed by FDOT will substantially increase the safety on the project corridor. The District considered this to be an important positive element in the public interest balancing test. The existing 2:1 slopes of the roadway make it difficult for drivers to recover from running off the roadway, resulting in a greater frequency of this type of accident. Moreover, the existing clear zone is not large enough to overcome the 2:1 slope to allow safe recovery of errant vehicles. As a result, catastrophic crashes occur rather than safe recoveries. Also, as with hurricane evacuation discussed in the following section, actual accidents on the roadway prevent traffic from accessing or leaving the Keys, and also prevent emergency vehicles from rapidly accessing the Keys and a crash site. This occurs because there is little or no shoulder or clear zone along the sides of the road to allow emergency vehicles to efficiently access an accident site, and in the event of a severe, head-on type collision, the roadway is blocked off. U.S. 1 through the project corridor is regarded as so unsafe for travel that Monroe County law enforcement officials call it "death alley." There are many head-on collisions due to the two-lane, no-median alignment. Law enforcement is difficult and dangerous along the roadway, because it has very few areas wide enough to allow law enforcement officials to detain driving violators. It is also very dangerous, for the same reasons, for a driver to pull off the roadway with a broken-down vehicle. High rates of speed and impaired drivers contribute to the accident rates along the project corridor. The efforts of law enforcement to control speeders and drunk drivers is impeded since it is practically impossible for enforcement officers to turn their vehicles around to pursue violators without running a high risk of causing an accident on their own. The project would significantly improve safety on the roadway by reversing the problems identified in the this section, as well as the previous sections of this Recommended Order. The project would virtually eliminate head-on collisions which largely contribute to serious injuries and fatalities along the roadway. The project would also help eliminate problems with emergency vehicle access to accident sites and restoration of service in the event of accidents, and would increase the roadway's level of service as discussed below. Improved level of service was an additional need considered by FDOT during the PD&E process. While the District did not consider the traffic level of service by itself to be weighted as part of the positive public interest criteria in this project, the impacts of resulting congestion are relevant to the public interest consideration of traffic safety as discussed in the foregoing sections. Lower quality level of service, as presently exists on the roadway through level of service F, adversely affects the safety of the roadway. When traffic levels rise, driver frustration increases leading to drivers passing in no-passing zones and potentially resulting in head-on collisions and high-severity accidents. Additionally, due to the narrow shoulders of the existing roadway, accident vehicles pose a threat to and impede normal traffic flow on the roadway. The Highway Capacity Manual set the standards for traffic engineering and is used in all fifty states. The manual classifies the existing roadway as a two-lane arterial rural road. Applying the standards for measuring level of service for two-lane rural roads set forth in the Highway Capacity Manual, FDOT determined that the existing level of service on the roadway is E, which is a very poor level of service that does not meet the established standard of level of service C required by the Highway Capacity Manual. Monroe County uses a speed based method of calculating level of service. Using that method, the level of service for U.S. 1 is at an acceptable level. The parties disagree as to which method of calculating the level of service is appropriate. That conflict is resolved by finding that the method used by FDOT is the appropriate method because of its wide acceptance and long-term use. Traffic volume in the area of the southern terminus of the project is growing at a rate average annual rate of 3.07 percent. In the present condition of the roadway, level of service will degrade to F, or forced-flow conditions, by the year 2006. Even with the improvements proposed by FDOT, the level of service in the northbound direction would improve to level of service B, but the level of service in the southbound direction would remain at level of service D or E due to the single southbound land configuration. Hurricanes pose a serious threat to the safety and welfare of residents and visitors of the Keys. Monroe County is the most vulnerable hurricane-prone area in the United States because it is surrounded by tropical waters, land elevation is low throughout the islands, and the evacuation routes are limited to U.S. 1, an extended route that starts in Key West and runs to the mainland, and Card Sound Road. The greatest potential for loss of life during a hurricane in the Keys is from storm surge. Storm surge is a dome of water near the center of a hurricane which is created by the winds on the water's surface. In a category 3, 4 or 5 storm, the entire land mass in the path of the storm will be inundated. Because of the wind and storm surge associated with hurricanes, the best response to a hurricane warning in the Keys is to evacuate people to the mainland away from the water and the storm surge threat. Accordingly, Monroe County orders a mandatory evacuation in a category 3, 4, or 5 hurricane, and no shelters are opened. There is little or no disagreement as to the vulnerability of the Keys to hurricanes or as to the danger posed by a hurricane. There is disagreement as to whether the proposed project is needed for improved hurricane evacuation. The conflicting evidence in this regard is resolved by the following findings, which are based on the more credible, substantial evidence. The existing road does not have sufficient hurricane evacuation capacity to meet the present and projected future needs of Monroe County residents and visitors. In current hurricane evacuations, the two northbound lanes on U.S. 1 between mile marker 90 and 106 are split at Key Largo. Sixty percent of the traffic is directed up the northbound lane of U.S. 1; forty percent of the traffic is diverted onto the northbound lane of Card Sound Road. One southbound lane of U.S. 1 and Card Sound Road must remain open for emergency vehicles to reach an accident or a disabled vehicle, or to bring emergency supplies into the Keys. Improving the roadway is critical to the success of Monroe County's hurricane evacuation plan. FDOT relied on hurricane evacuation and needs modeling performed by Monroe County and the ACOE to confirm the need for improvements. All of the models used indicated that the project corridor is the controlling roadway segment for improving hurricane evacuation of the Keys. Additionally, FDOT relied on the Lewis Report of January 15, 1993, a study commissioned by the Governor of Florida. Recommendation No. 17 of the Lewis report recommends that FDOT expedite the design and construction of the project, which is viewed as being critical for increasing the rate of emergency evacuation. Dr. Robert Sheets, former director of the National Hurricane Center, testified that the failure to make improvements to the roadway would be "unconscionable." Dr. Sheets and Billy Wagner, the Director of Emergency Management for Monroe County, presented very compelling and very persuasive testimony that this project is essential for hurricane evacuation purposes. The proposed project is the minimum transportation improvement that will achieve a significant improvement in evacuation safety and clearance time. With the present two- lane configuration and narrow shoulders, evacuating traffic would be halted completely by a vehicle breakdown or an accident blocking one lane. Replacement of the Jewfish Creek Bridge will also facilitate the hurricane evacuation need for the project. In addition to improving the rate of evacuation, the project will make an evacuation safer. Emergency personnel cannot reach accidents on the roadway during an evacuation because, in certain segments, no roadbed exists adjacent to the northbound lane. A second northbound lane and wider road shoulders would enable disabled vehicles to be serviced and removed from the highway. The proposed changes to the road would improve emergency vehicles' access to an accident scene. The elevation of the roadway at Lake Surprise is so low that it can be flooded easily by a storm. The proposed project would replace the existing muck bed of the roadway with more stable material. The existing roadway is subject to settling and washout during storm events, which reduce the safety of the roadway itself and reduce the evacuation capacity of the roadway. If washout occurs, moving equipment to the islands for recovery efforts following a hurricane will be difficult or impossible. The proposed project will prevent erosion and reduce the effects of storm surge and wave action on the road during a hurricane. When the project has been completed, three lanes of evacuating traffic, two lanes from U. S. 1 and a third from Card Sound Road, will converge at Florida City. Representatives of FDOT, the Monroe County Sheriff's Department, the Florida Department of Law Enforcement and Monroe County Emergency Management have planned to manage the northbound traffic when it reaches Florida City during an evacuation. Several feasible alternatives exist, but additional planning is needed to prevent a monumental bottleneck at the northern terminus of the project. While it is clear that this project will not resolve all problems that exist as to hurricane evacuation, it is also clear that this project is essential to improve hurricane evacuation. SECTION 403.918(2)(a)2, FLORIDA STATUTES Section 403.918(2)(a)2, Florida Statutes, requires the permitting agency to consider “[w]hether the project will adversely affect the conservation of fish and wildlife, including endangered species, or their habitats.” The District considered the effect of the direct loss of dredging and filling 149.07 acres of wetland. As set forth in previous sections, it is found that this loss will be offset by the mitigation. For use during construction of the project, FDOT will adhere to technical special provisions and special permit conditions 9 through 13 to protect manatees, crocodiles, alligators, indigo snakes, marine turtles, and valuable trees, palms and other wildlife, to minimize or preclude any impacts to those species. Additionally, any osprey nests around the Jewfish Creek Bridge area at the time of construction will be relocated by FDOT if necessary. As part of the development of the FEIS, as required by the Federal Highway Administration under the National Environmental Protection Act, FDOT obtained official letters of concurrence from the USFWS and NMFS that the project would cause no adverse impacts to endangered species under section 7 of the Endangered Species Act. That process also established the project's consistency with Florida Coastal Zone Management Program, as determined by the State Clearinghouse within the Office of the Governor, in coordination with DEP, the Department of National Resources and FGFWFC. The project also contains provisions to impact positively or enhance the conservation of fish and wildlife, including threatened or endangered species and their habitat, as described below. These were positive factors that further helped neutralize and offset the 149.07 acres of direct impacts. In addition, FDOT is required to evaluate the effectiveness of the fencing along the entire project corridor, discussed below, and report to the District on that effectiveness. If the District determines that the fencing could be more effective, it may require FDOT to implement those suggestions. South of the C-111 canal, construction of box culverts and bridges addresses impacts to the American crocodile, a listed endangered species. Problems were identified with placement of existing culverts, which did not provide enough clear space and which caused the crocodile to cross over the roadway rather than through the culvert. To address this problem, 15 larger box culverts and three bridges will be placed within the roadway. These provide the necessary clear space to allow the crocodile to safely pass under rather than over the road. The location of the box culverts was chosen by reviewing crocodile mortalities associated with road crossings. Placement of these box culverts and bridges will also improve the hydrological flow of water within the project area, provide a crossing area for manatees, and allow greater dispersal of the crocodile population throughout Florida Bay. Species expected to use these box culverts include aquatic and aquatic water dependent species in the area. They were primarily targeted for crocodiles, alligators, and manatees, but certain fishes, turtles, frogs and other species in the wetlands along the project corridor will utilize the culverts. The box culverts will have 100 feet of wingback fencing extending north and south of each culvert. The intent of the wingback fencing is to funnel wildlife into the box culverts. Intermittent or wingback fencing is appropriate south of the C-111 canal for two primary reasons. First, the animals which will be guided into the box culverts are aquatic dependent. The area south of the C-111 canal is primarily water, washed mangrove areas and tidal creeks. Crocodiles tend to move in tidal creeks. Second, it was not possible to ensure continuous fencing along all portions of the project south of the C-111 canal because there are existing businesses. It could not be assured that these businesses would keep a gate closed. The project originally proposed continuous fencing alongside the road where it abuts ENP. Continuous fencing was initially proposed because the initial application included a solid concrete barrier down the median of the road. If a crocodile did enter the road from the side with discontinuous fencing, after crossing one lane the crocodile would hit the barrier, but then easily find its way back to the area it came from. However, the project was later modified to include a tri-beam barrier because it lessens the footprint of the project and thereby lessens the wetland impact. Since the current application does not include a continuous barrier down the middle of the road, if a crocodile enters the road it would cross the tri-beam barrier, go across another lane of roadway before hitting a continuous fence. The animal would then run up and down that fence with nowhere to go except back across the road again. This would increase their exposure to a road kill. With the installation of bridges and culverts along the southern portions of the project corridor, there is no need for continuous fencing because aquatic wildlife, such as the American crocodile, will tend to follow the flow of water through the culverts rather than climb over the roadway. The FGFWFC and ENP oppose continuous fencing and prefer intermittent fencing south of C-111 canal since the project now includes a tri-beam barrier. Positive benefits also include construction of panther crossings at four locations north of the C-111 canal to account for impacts to the Florida panther, a listed endangered species, in the vicinity of the project, along with continuous fencing on both sides of the road north of the C- 111 canal. The crossings will be placed at locations that show historical use by wildlife, including areas at the Dade County Correctional Institute access roadway, the water control structure on the C-109 canal, and the berm of the C- 111 canal. The wildlife crossings are indicated by blue dots on FDOT's Exhibit 1. FDOT underwent years of extensive coordination with the environmental regulatory and resource agencies to design a project that would accommodate their ecosystem management plans. The location of the wildlife crossings was based upon radio telemetry data, collected from radio-collared panthers, and their typical corridor movement. The location was further chosen based on input from the USFWS and the FGFWFC. The continuous fencing north of the C-111 canal will prevent wildlife from crossing the road, and instead force them to use the wildlife crossings. The crossings were designed for panther use, the panthers being the shyest animal in the area. If panthers can be accommodated, then other threatened and endangered species and other wildlife are expected to use them. DOT studies of the effectiveness of wildlife crossings, with fencing, including crossings installed on Alligator Alley, establish that wildlife will use the crossings, both singly and in groups, and that the crossings substantially reduce, if not eliminate, automobile- related mortality of wildlife. Documented wildlife include panthers, wild turkeys, wading birds, alligators, deer, bobcats, black bears and raccoons. SECTION 403.918(2)(a)3, FLORIDA STATUES Section 403.918(2)(a)3, Florida Statutes, requires the permitting agency to consider “[w]hether the project will adversely affect navigation or the flow of water or cause harmful erosion or shoaling.” The replacement of the bascule bridge at Jewfish Creek with a 65-foot high fixed-height bridge will be a benefit to navigation. Because Jewfish Creek is part of the intracoastal waterway, the existing bridge has to be frequently raised or lowered to accommodate marine traffic. Because of the age of the existing structure, frequent breakdowns have been experienced. Marine traffic is stopped or delayed if the bridge cannot be raised or if there is a delay in raising the bridge. Vehicular traffic is stopped while the bridge is raised. Regarding the flow of water, the project incorporates wildlife box culverts and bridges, which will improve tidal flushing and the flow of water south of the C- 111 canal. The District considered this to be a positive consideration under the public interest test. The 25 hydrologic culverts north of the C-111 canal were also a positive factor in the test because the culverts provide future water management capability. Erosion and shoaling are neutral factors in the public interest test because the permit conditions contain a plan to control erosion and shoaling during construction and to provide for road stabilization after construction. In addition, there is a positive factor regarding shoaling in that the roadway area now has a lot of storm action, causing problems with erosion on the side of the road. The project provides for road stabilization, which is a neutral to positive factor in the public interest test. SECTION 403.918(2)(a)4, FLORIDA STATUTES Section 403.918(2)(a)4, Florida Statutes, requires the permitting agency to consider “[w]hether the project will adversely affect the fishing or recreational values or marine productivity of the project.” A positive factor pertaining to marine productivity is the box culverts and bridges south of C-111, which will allow marine species to travel beneath the road to access the water on both sides of the road. Removal of the causeway along Lake Surprise opens that water body back up to one contiguous system, which is also a positive factor. The seagrass mitigation addressed in previous sections will also improve marine productivity and provide habitat for fish. SECTION 403.918(2)(a)5, FLORIDA STATUTES Section 403.918(2)(a)5, Florida Statutes, requires the permitting agency to consider “[w]hether the project will be of a temporary or permanent nature.” The project is permanent, though some construction impacts are temporary in nature. Once temporary impacts have ended and the project is complete, the project will be a positive benefit, because of the construction of the SWM system, culverts, animal underpasses and other benefits as set forth above. SECTION 403.918(2)(a)6, FLORIDA STATUTES Section 403.918(2)(a)6, Florida Statutes, requires the permitting agency to consider “[w]hether the project will adversely affect or will enhance significant historical and archaeological resources under the provisions of s. 267.061.” This factor is not at issue. SECTION 403.918(2)(a)7, FLORIDA STATUTES Section 403.918(2)(a)7, Florida Statutes, requires the permitting agency to consider “[t]he current condition and relative value of functions being performed by areas affected by the proposed activity.” A percentage of wetlands immediately adjacent to the road are impacted by exotic vegetation. Areas further out are part of a significant wetland ecosystem and are considered high quality. This project contains an exotic control program within FDOT's right of way, which is a positive consideration in the public interest test. Wetlands are currently receiving untreated storm water, which runs off the road immediately into the adjacent wetlands and water bodies without treatment. The project will include a SWM system where none currently exists as is detailed in the previous sections. This is a positive factor in the public interest test. The direct impacts of the project on 149 acres of wetlands alongside the roadway is not as large or significant as the impact caused by placement of the original embankment and resulting cut off of the eastern and western portions of the Everglades north of the C-111 canal. Overall, the concurrent and upfront mitigation efforts of FDOT are of regional significance and benefit to Everglades ecosystem by helping to repair the damage caused by the original embankment. THE PROJECT IS CLEARLY IN THE PUBLIC INTEREST The District appropriately weighed all considerations in determining that the project is clearly in the public interest. The greater weight of the competent, credible evidence established that the project is clearly in the public interest. RIGHT OF WAY PERMIT APPLICATION The land encompassed by the ROW permit has been properly adopted as a "work" of the District, requiring District authorization via a ROW Permit Modification to FDOT. The District's real property interest in the C-111 ROW applicable to the ROW permit modification consists of both fee simple and easement interests. The evidence is clear that DOT's application for the permit modification was thoroughly reviewed by the District, consistent with the District's established ROW permit review process. The District presented uncontroverted evidence and expert testimony to establish by a preponderance of the evidence that issuance of the permit modification to FDOT is consistent with all applicable District statutes, rules and other criteria, including the District's conditions for issuance of ROW Permits set forth in Rule 40E-6.301, F.A.C. FBII offered no evidence or testimony to the contrary. FUTURE MODIFICATIONS Modifying the project at a later date to pave a second southbound lane would require a District ERP permit. The addition of impervious surface triggers the District's SWM jurisdiction in this regard. However, FDOT established that that it had no current plans for further widening. The permit conditions require secondary and cumulative impacts associated with the increased capacity be addressed in accordance with the rules and criteria in effect at the time of any application for future widening. In addition, the permits require that FDOT must comply with any more stringent water quality criteria in effect at the time of any future widening. MODIFICATIONS AT THE FINAL HEARING At the Final Hearing, the District issued an Addendum to Staff Report for each of the SWM and WRM permits. The amendments made non-substantive changes to the District's staff reports regarding fencing along the roadway, performance of a study of fencing on the roadway by FDOT, water quality sampling along the roadway, assignment of mitigation credits, and other technical changes in wording for purposes of clarification. The changes set forth in the District's Exhibits 5 and 6 do not create impacts to the environment beyond those addressed elsewhere herein.

Recommendation Based on the foregoing findings of fact and conclusions of law it is RECOMMENDED that the Governing Board of the South Florida Water Management District enter a Final Order that issues the three permits challenged in this proceeding (SWM Permit No. 940606-10, WRM Permit No. 9460606-2-D, and ROW Permit No. 2584) subject to the conditions contained in the staff reports on the SWM permit application and the WRM permit application and subject to the additional permit conditions reflected by District Exhibits 5 and 6 and by the Findings of Fact pertaining to the permit for the relocation of the FKAA pipe. DONE AND ENTERED this 11th day of April, 1997, in Tallahassee, Leon County, Florida. ___________________________________ CLAUDE B. ARRINGTON Administrative Law Judge Division of Administrative Hearings Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (904) 488-9675 SUNCOM 278-9675 Fax Filing (904) 921-6847 Filed with the Clerk of the Division of Administrative this 11th day of April, 1997.

Florida Laws (8) 120.5714.31203.02373.016373.046380.0552380.067.29
# 3
CONSERVANCY OF SOUTHWEST FLORIDA vs SOUTH FLORIDA WATER MANAGEMENT DISTRICT, 14-001329RP (2014)
Division of Administrative Hearings, Florida Filed:West Palm Beach, Florida Mar. 19, 2014 Number: 14-001329RP Latest Update: Apr. 25, 2014

The Issue The issue to be determined in this case is whether proposed Florida Administrative Code Rule 40E-10.041(3)(d) of the South Florida Water Management District (“the District”) is an invalid exercise of delegated legislative authority.

Findings Of Fact The Conservancy is a non-profit Florida corporation with its offices in Naples, Florida. It has 6,200 members residing in Southwest Florida. The mission of the Conservancy is to protect the environment and natural resources of Southwest Florida. The Caloosahatchee River is an important focus of the Conservancy’s organizational activities and objectives. A substantial number of the members of the Conservancy use the Caloosahatchee River for drinking water, boating, fishing, wildlife observation, and scientific research. The proposed rules create a prospective reservation of water in the not-yet-operational Caloosahatchee River (C-43) West Basin Reservoir “for fish and wildlife.” The Conservancy’s interests would be substantially affected by the proposed reservation. The District is a regional water management agency created, granted powers, and assigned duties under chapter 373, Florida Statutes (2013). It is headquartered in West Palm Beach, Florida. Proposed rule 40E-10.041(3) states: (3) Caloosahatchee River (C-43) West Basin Storage Reservoir: All surface water contained within and released, via operation, from the Caloosahatchee River (C-43) West Basin Storage Reservoir is reserved from allocation. The water reserved under this paragraph will be available for fish and wildlife upon a formal determination of the Governing Board, pursuant to state and federal law, that the Caloosahatchee River (C-43) West Basin Storage Reservoir is operational. The reservation contained within this subsection and the criteria contained in section 3.11.4 of the Applicant’s Handbook for Water Use Permit Applications within the South Florida Water Management District, incorporated by reference in Rule 40E-2.091, F.A.C., shall be revised in light of changed conditions or new information prior to the approval described in paragraph (3)(b) above. Pursuant to subsection 373.223(4), F.S., presently existing legal uses for the duration of a permit existing on [RULE ADOPTION DATE] are not contrary to the public interest. The Conservancy challenges only paragraph (3)(d), contending that it modifies or contravenes the implementing statute, section 373.223(4).

Florida Laws (7) 120.52120.54120.56120.57120.68373.042373.223
# 4
A. WAYNE LUJAN vs DEPARTMENT OF ECONOMIC OPPORTUNITY AND DEPARTMENT OF ENVIRONMENTAL PROTECTION, 20-000661 (2020)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Feb. 06, 2020 Number: 20-000661 Latest Update: Jul. 04, 2024

The Issue The issue to be decided in these cases is whether Petitioner, A. Wayne Lujan (Petitioner), was entitled to issuance of five environmental resource permits (ERPs) that Respondent, Department of Environmental Protection (DEP), intended to deny as stated in notices of denial dated October 25, 2019.

Findings Of Fact The following Findings of Fact are based on the stipulations of the parties and the evidence adduced at the final hearing. Parties and Background Petitioner Lujan is the president and a director of Kay Haven Associated Enterprises, Inc. (Key Haven), that owns the five parcels, which are the subject matter of this hearing. Although Key Haven owns numerous lots, it chose to submit ERP applications for the Subject Lots within the Key Haven Tenth Addition plat dated September 1966 (Plat). See Joint Exhibit 84. Joint Exhibit 84 The Subject Lots are located in an unincorporated part of the County on the northwestern edge of a body of land lying north of State Road A1A, identified on the Plat as Raccoon Key. The Subject Lots are approximately half a mile east of the city limits of Key West, Florida. The Subject Lots are all characterized by a small upland portion adjacent to Floral Avenue. The majority of the Subject Lots transition into a mangrove fringe of varying depth and submerged lands containing marine seagrasses and sponges. See Joint Exhibits 81 and 82. Joint Exhibit 81 Joint Exhibit 82 DEP is the administrative agency of the state having the power and duty to protect Florida's air and water resources, and to administer and enforce the provisions of part II of chapter 380, part IV of chapter 373, and chapter 403, Florida Statutes. DEP also administers the provisions of Florida Administrative Code chapters 62-312 and 62-330 regarding activities in wetlands and other surface waters of the state. DEO is the state land planning agency and reviews certain permit applications for consistency with its statutory responsibilities under the Florida Coastal Management Program (FCMP), which includes part II of chapter 163, and part I of chapter 380, Florida Statutes. Relevant to this proceeding, DEO exercises authority over the ACSC program. See § 380.05, Fla. Stat. On July 26, 2018, Petitioner filed five applications for ERPs with DEP. Although certain details within each application differed, the applications all sought to authorize construction of a seawall in the waters of the Gulf of Mexico and in unnamed wetlands within the landward extent of the Gulf of Mexico, a Class III OFW, to remove the entirety of the existing mangrove fringe, and to place fill within wetlands and other surface waters for the construction of single-family residences (Project). The minor differences in each application relate to the length of the seawall and the amount of fill necessary for each lot. Although some testimony was provided concerning the differences, no party argued that the differences were material to the determinations necessary in this proceeding. Accordingly, the factual and legal analysis for the Subject Lots and ERP applications were addressed without distinction herein. DEP forwarded a copy of the applications to DEO for its recommendation. On August 24, 2018, DEO issued objections to approval of the permits citing inconsistency with the Florida Keys ACSC Principles for Guiding Development (PGDs) in section 380.0552(7). DEO also objected based on inconsistencies between the Project and the Monroe County Comprehensive Plan (Comp Plan) and Land Development Code (LDC), which implement the PGDs. DEP's first RAI dated August 24, 2018, included DEO's objections. The first RAI notified Petitioner that DEP had concerns with the Project that included: (1) installation of the vertical seawall; (2) placement of fill within an OFW; (3) direct impacts to marine seagrass bed community without adequate mitigation; and (4) failure to provide stormwater management plans since the Project was a common plan of development. The first RAI contained 19 specific requests for additional information. On October 23, 2018, Petitioner responded to DEP's first RAI by submitting slightly revised plans. The revised Project proposed less of a vertical seawall footprint by adding rip-rap to the side seawalls as a means of containing fill. Petitioner's responses to the 19 specific requests for information can generally be categorized as follows: (1) elimination of some vertical seawalls, but not the ones on the waterward edge of the Subject Lots; (2) no change in the placement of fill; (3) Petitioner would attempt to find appropriate compensatory mitigation for the seagrass impacts; and (4) Petitioner did not consider the Project to be a common plan of development. Regarding DEO's objections, Petitioner stated that "[w]e acknowledge that the project has been forwarded to FWC [Florida Fish and Wildlife Conservation Commission] and DEO and that additional comments and information may be requested by those agencies in order to fully evaluate the application." Petitioner did not substantively address DEO's objections. DEP issued a second RAI on November 21, 2018. DEO again objected in a letter dated November 26, 2018. DEP's second RAI raised the same concerns as the first RAI and acknowledged that four of the 19 specific items were adequately addressed. On January 11, 2019, Petitioner responded to DEP's second RAI by again submitting slightly revised site plans. However, the Project remained generally unchanged, with a proposed vertical seawall on the waterward edge of the lots, rip-rap along the sides, removal of the entire mangrove fringe, and fill of the entire lots eliminating the existing marine seagrasses. DEP issued a third RAI to Petitioner on February 8, 2019. DEO reiterated its objections by letter dated February 8, 2019. The third RAI raised the same concerns as the first and second RAIs, although DEP acknowledged that six of the 19 specific items were adequately addressed. By letter dated April 8, 2019, Petitioner responded to DEP's third RAI. The response again proposed slightly altered site plans from the January 2019 submissions. Petitioner essentially stated that mitigation opportunities were scarce, but had contacted the County and was looking into derelict vessel removal. However, the proposed Project remained generally unchanged, with a proposed vertical seawall on the waterward edge of the lots, rip-rap along the sides, removal of the entire mangrove fringe, and fill of the entire lots eliminating the existing marine seagrasses. As it relates to DEO's objections, Petitioner responded that "[a]fter review of the comments outlined in the [DEO] revised letter, it seems that the DEO objections are related to compliance with the provision[s] of the [Monroe] County [Comp Plan]. We will deal with those issues at the time of local permitting." Petitioner again failed to substantively address DEO's objections. DEP issued its final RAI on May 8, 2019. DEO again objected by letter dated May 6, 2019. This final RAI raised the same concerns as the first, second, and third RAIs. DEP stated that seven of the 19 specific items were not addressed by Petitioner, and that failure to provide a complete response to the prior RAI may result in denial of the ERP applications. On August 29, 2019, Petitioner responded to DEP's final RAI by once again submitting slightly revised plans, and additional information concerning mitigation proposals. However, the Project did not change and Petitioner again failed to substantively address DEO's objections. DEO’s objection letter identified that the ERP applications were inconsistent with the Florida Keys ACSC PGDs, seven Comp Plan policies, and six regulatory provisions of the County's LDC. DEP denied the ERP applications on October 25, 2019. The grounds for denial reiterated the issues not addressed by Petitioner's RAI responses. Specifically: (1) the failure of the Project to provide reasonable assurances concerning direct, secondary, and cumulative impacts to the marine seagrass bed community; (2) continued reliance upon construction of a vertical seawall; (3) failure to provide stormwater management information necessary given the determination that the Project constituted a common plan of development; (4) inconsistency with the FCMP as identified by DEO in its objection letters; and (5) failure to provide reasonable assurances that the Project was clearly in the public interest. Direct Impacts The Project proposed to entirely fill the Subject Lots, contain the fill with vertical seawalls and rip-rap, and construct pile-supported single-family residences. The Project would remove the entire mangrove fringe that aerials and site inspections show is a healthy mix of red, black, and white mangroves along with some green buttonwood. The shallow, open surface waters are dominated by marine seagrasses that vary in density. Petitioner did not make any design modifications to the Project that sought to reduce or eliminate direct impacts to the mangrove fringe and marine seagrasses. Petitioner's resource inventory was done using GIS aerial photography so that the aerial benthic resource surveys submitted to DEP were not ground- truthed. DEP staff conducted physical site inspections and ground-truthing inspections that included swimming in the open surface waters. DEP staff found significant marine seagrasses and sponges that were not mentioned in Petitioner's resource surveys. Depending on the lot, the Project would fill approximately 6,000 square feet of wetlands and other surface waters, i.e., 900 to 2,500 square feet of mangrove habitat and 4,000 to 4,800 square feet of marine seagrass bed habitat. The seawalls depicted in the final version of Petitioner's site plans were "vertical seawalls" because the rip-rap would not face the seawalls to the mean high water line (MHWL). The rip-rap would be placed on submerged resources inside the property lines of the Subject Lots. Also, Petitioner's final plans did not include the mooring of vessels. Vertical seawalls are prohibited in the OFW of the County. Petitioner did not affirmatively demonstrate that fill or shoreline stabilization could be accomplished by using native vegetation instead of vertical seawalls. Secondary Impacts DEP's expert witness, Ms. Mills, testified that Petitioner's ERP applications did not identify any potential secondary impacts. Ms. Mills testified that the expected secondary impacts from the Project included stormwater runoff, shading, and erosion or shoaling. Although the Project plans showed that stormwater would be collected and directed to Floral Avenue, DEP's investigation established that there is no stormwater management system on the side of Floral Avenue abutting the Subject Lots. Thus, the collected and directed stormwater would end up flowing back into the mangrove fringe and surface waters at the lot locations that were not proposed for development, e.g., Lots 36 and 38. The proposed single-family homes are piling-supported structures. Ms. Mills testified that the piling-supported structure would cause shading of the immediate adjacent resources on either side. She identified potential shading impacts to the resources of the undeveloped Lots 36 and 38. In addition, Ms. Mills identified potential erosion or shoaling impacts to the undeveloped Lots 36, 38, and unnamed lots to the left of Lot 40 since they would be surrounded by developed fill on either side. Although Mr. Swakon testified that tidal velocity is low in this area, other aspects, such as effects from wind-driven circulation, were not adequately addressed. Mitigation Petitioner was required to propose mitigation to offset remaining direct and secondary impacts after going through a reduction and elimination exercise. However, Petitioner did not propose any revisions to the Project to reduce or eliminate the direct and secondary impacts identified above. Ms. Mills explained that appropriate mitigation usually provides benefits to the same type of ecological community as the one being impacted. Petitioner's ultimate mitigation proposal was to purchase saltwater credit at a mitigation bank, the Florida Power and Light Everglades Mitigation Bank (FPL EMB). The FPL EMB is located on the mainland of Florida approximately a hundred miles away from the Subject Lots. Ms. Mills testified that saltwater credit would be appropriate to offset and replace the same ecological function of mangroves, but not to offset the submerged benthic communities that would be impacted by the Project. Mr. Swakon testified that calculation of the amount of mitigation credits included a multiplier to address secondary and cumulative impacts, the out-of-kind mitigation, and the dissimilarities in the communities. However, Ms. Mills persuasively testified that the proposed multiplier was not sufficient to justify the three aspects of impact that needed to be offset. Whether to justify dissimilarities between the ecological communities, secondary and cumulative impacts, or the distance of the mitigation site from the Project, the multiplier was not sufficient. Cumulative Impacts The Project is not within a recognized cumulative impact basin of the South Florida Water Management District (SFWMD) for mitigation of impacts purposes. Accordingly, Ms. Mills testified that the plain language of a cumulative impacts analysis is considered. Contiguous lots to the Subject Lots owned by Petitioner could be developed through similar requests in the future. Also, each ERP application's cumulative impact analysis would consider the other four ERP applications as in-house examples of potential future projects. Common Plan of Development Petitioner contested DEP's conclusion that the Project was a common plan of development subject to section 2.0 of the Applicant's Handbook Volume 1 and associated stormwater management requirements. The Project would facilitate the advancement of land uses such as multiple residences, a residential subdivision, or phased site development. The Project comprised a total land area divided into multiple lots or parcels that are under common ownership or control. In total, Petitioner owns 648 lots under common ownership within the Key Haven Tenth and Eleventh Addition. The Subject Lots are all part of a residential subdivision. Thus, the preponderance of the evidence demonstrated that the Project was a common plan of development. For this common plan of development, Petitioner's proposed stormwater management consisted of a cap on the proposed seawalls directing stormwater to swales on each lot. The swales would then direct stormwater to Floral Avenue with no additional treatment or management. During site inspections, DEP staff did not find any evidence of stormwater management along Floral Avenue. Seawalls and Rip-rap The seawalls depicted in the final version of Petitioner's ERP applications would be vertical seawalls because the rip-rap facing the seawall did not come above the MHWL. In addition, the final plans did not include the mooring of vessels. As found above, the Project would place fill, seawalls, and rip-rap on marine seagrasses and sponges. Petitioner failed to affirmatively demonstrate that native vegetation was not sufficient to prevent erosion. The evidence established that Petitioner did not apply for any waiver or variance of applicable ERP rule criteria. FCMP Consistency The evidence demonstrated that Petitioner refused to address DEO's objections based on a mistaken view of the criteria governing ERP applications in the County and the Florida Keys ACSC. Relevant to this proceeding, DEO exercises authority over the ACSC program. See § 380.05, Fla. Stat.; see also § 380.23(6), Fla. Stat. (Each agency charged with implementing statutes and rules that are part of the FCMP, shall be afforded an opportunity to provide DEP with its comments and determination regarding consistency of the activity with those statutes and rules.). Section 380.05(16) prohibits persons from undertaking any development within the Florida Keys ACSC, except in accordance with the PGDs. Thus DEO, as the administrator of the ACSC program, reviewed the ERP applications for consistency with applicable regulatory requirements. DEO issued objections to approval of the permits citing inconsistency with the Florida Keys ACSC PGDs; and inconsistencies between the Project and the County's Comp Plan and LDC which implement the PGDs. DEO identified that the Project would be inconsistent with four PGDs. DEO's expert witness, Ms. Powell, testified that the Project was inconsistent with the PGD, which provides for strengthening local government capabilities for managing land use and development so that the local government is able to achieve these objectives without continuing the ACSC designation. See § 380.0552(7)(a), Fla. Stat. Ms. Powell persuasively testified that the ERP applications were inconsistent with this PGD because the Project would impair the local government's ability to have the ACSC designation removed. Allowing development inconsistent with its regulations would hurt the local government's ability to pursue de-designation. No evidence was presented by Petitioner that the Project would be consistent with this PGD. The second PGD cited by DEO provides for protecting shoreline and marine resources, including mangroves, coral reef formations, seagrass beds, wetlands, fish and wildlife, and their habitat. See § 380.0552(7)(b), Fla. Stat. It was undisputed that the Project would result in total removal of the mangrove and buttonwood fringe on each lot and 100% destruction of existing submerged marine resources. No evidence was presented by Petitioner that the Project would be consistent with this PGD. The third PGD cited by DEO provides for limiting the adverse impacts of development on the quality of water throughout the Florida Keys. See § 380.0552(7)(e), Fla. Stat. Ms. Powell testified that degradation to nearshore water quality from prior dredge and fill activity was one of the reasons for the designation of the Florida Keys as an ACSC. Additionally, as further discussed below, the Project would be inconsistent with the County's Comp Plan policies and LDC regulations that further the goal of protecting the quality of water throughout the Florida Keys ACSC. No evidence was presented by Petitioner that the Project would be consistent with this PGD. The fourth PGD cited by DEO provides for protecting the public health, safety, and welfare of the citizens of the Florida Keys, and maintaining the Florida Keys as a unique Florida resource. See § 380.0552(7)(n), Fla. Stat. As further discussed below, the Project would be inconsistent with the County's Comp Plan and LDC regulations that prohibit the use of structural fill within velocity zones. No evidence was presented by Petitioner that the Project would be consistent with this PGD. Ms. Powell testified that DEO considered the remaining statutory PGDs, and determined they were not particularly applicable to these ERP applications. In accordance with its duties, DEO had also reviewed and approved the County's Comp Plan and LDC as consistent with the statutory PGDs. DEO identified that the Project would be inconsistent with seven Comp Plan policies. They are Policies 102.1.1, 101.5.25, 203.1.1, 204.2.2, 204.2.3, 204.2.4, and 212.5.3. Policy 102.1.1 provides: The County shall protect submerged lands and wetlands. The open space requirement shall be one hundred (100) percent of the following types of wetlands: submerged lands mangroves salt ponds fresh water wetlands fresh water ponds undisturbed salt marsh and buttonwood wetlands Allocated density (dwelling units per acre) shall be assigned to freshwater wetlands and undisturbed salt marsh and buttonwood wetlands only for use as transferable development rights (TDRs) away from these habitats. Submerged lands, salt ponds, freshwater ponds, and mangroves shall not be assigned any density or intensity. Policy 101.5.25 provides that "[t]he allocated densities for submerged lands, salt ponds, freshwater ponds, and mangroves shall be 0 and the maximum net density bonuses shall not be available." Policy 203.1.1 provides that "[t]he open space requirement for mangrove wetlands shall be one hundred (100) percent. No fill or structures shall be permitted in mangrove wetlands except for elevated, pile-supported walkways, docks, piers and utility pilings." Policy 204.2.2 provides: To protect submerged lands and wetlands, the open space requirement shall be 100 percent of the following types of wetlands: submerged lands; mangroves; salt ponds; freshwater wetlands; freshwater ponds; and undisturbed salt marsh and buttonwood wetlands. Allocated density (dwelling units per acre) shall be assigned to freshwater wetlands and undisturbed salt marsh and buttonwood wetland only for use as transferable development rights away from these habitats. Submerged lands, salt ponds, freshwater ponds and mangroves shall not be assigned any density or intensity. Within one (1) year after the adoption of the 2030 Comprehensive Plan, the County shall revise the LDC to include a prohibition of development in salt ponds. Policy 204.2.3 provides: No structures shall be permitted in submerged lands, mangroves, salt ponds, or wetlands, except for elevated, pile-supported walkways, docks, piers, and utility pilings. No fill shall be permitted in submerged lands, mangroves, salt ponds, or wetlands except: as specifically allowed by Objective 212.5 and subsequent Policies; to fill a manmade excavated water body, such as a canal, boat ramp, or swimming pool if the Director of Environmental Resources determines that such filling will not have a significant adverse impact on marine or wetland communities; or as needed for shoreline stabilization or beach renourishment projects with a valid public purpose that furthers the goals of the Monroe County Comprehensive Plan, as determined by the County. Policy 204.2.4 provides: No fill or structures shall be permitted in mangroves or wetlands except as allowed by Policy 204.2.3 (as amended) and for bridges extending over mangroves or wetlands that are required to provide automobile or pedestrian access to dwelling units located on upland areas within the same property for which there is no alternative means of access. Such bridges shall be elevated on pilings such that the natural movement of water, including volume, rate, and direction of flow shall not be disrupted or altered. Upland areas shall include disturbed wetlands that have been lawfully converted into uplands through filling. Policy 212.5.3 provides: Bulkheads, seawalls or other hardened vertical shoreline structures shall be permitted on residential canals and altered shorelines only in the following situations: to replace an existing deteriorated bulkhead or seawall; or to stabilize a severely eroding shoreline area. DEO's expert witness, Ms. Powell, persuasively testified that the Project was inconsistent with all seven policies, because it did not protect the submerged lands and wetlands, did not provide for 100% open space within the submerged lands and wetlands, and provided for the construction of a seawall not excepted from the general prohibition. Petitioner did not present any evidence that the Project was consistent with the cited policies. Instead, Petitioner's witness, Mr. Nelson, testified that he felt certain County regulations would militate in favor of allowing the development. The main factor cited by Mr. Nelson was that the Subject Lots were designated as Tier III parcels under the County's LDC. However, designation of a parcel as Tier III did not conflict with the policies cited by DEO. The more credible and persuasive evidence concerning the Project's compliance with the Comp Plan policies was provided by Ms. Powell, who concluded that the Project was not consistent with those policies. DEO identified that the Project would be inconsistent with six sections of the County's LDC regulations. Those are sections 118-4, 118-10(e), 118-12(k)(2), 122-4(b)(5), 130-157, and 130-162. The LDC regulations are more specific methods for implementing the Comp Plan policies outlined above. Section 118-4 provides: No development activities, except as provided for in this chapter, are permitted in submerged lands, mangroves, salt ponds, freshwater wetlands, freshwater ponds, or in undisturbed salt marsh and buttonwood wetlands; the open space requirement is 100 percent. Allocated density (dwelling units per acre) shall be assigned to freshwater wetlands and undisturbed salt marsh and buttonwood wetlands only for use as transferable development rights away from these habitats. Submerged lands, salt ponds, freshwater ponds and mangroves shall not be assigned any density or intensity. Section 118-10(e), in relevant part, provides: Mangroves, wetlands, and submerged lands. All structures developed, used or occupied on land classified as mangroves, wetlands or submerged lands (all types and all levels of quality) shall be designed, located and constructed such that: Generally. Only docks and docking facilities, boat ramps, walkways, water access walkways, water observation platforms, boat shelters, nonenclosed gazebos, riprap, seawalls, bulkheads, and utility pilings shall be permitted on or over mangroves, wetlands, and submerged lands, subject to the specific restrictions of this subsection. Trimming and/or removal of mangroves shall meet Florida Department of Environmental Protection requirements. * * * (4) Placement of fill. No fill shall be permitted in any mangroves, wetlands, or submerged lands except: As specifically allowed by this Section or by Section 118- 12(k) (Bulkheads, Seawalls, Riprap) and 118-12(l) (Boat Ramps); To fill a manmade, excavated water body such as a canal, boat ramp, boat slip, boat basin or swimming pool if the County Biologist determines that such filling will not have a significant adverse impact on marine or wetland communities; As needed for shoreline stabilization or beach renourishment projects with a valid public purpose that furthers the goals of the Monroe County Comprehensive Plan, as determined by the County Biologist; For bridges extending over salt marsh and/or buttonwood association wetlands that are required to provide automobile or pedestrian access to lawfully established dwelling units located on upland areas within the same property for which there is no alternate means of access. Such bridges shall be elevated on pilings so that the natural movement of water, including volume, rate and direction of flow shall not be disrupted or altered; or As approved for Disturbed Salt Marsh and Buttonwood Association Wetlands with appropriate mitigation as defined by the wetland regulations of subsection (e)(6) of this Section. Section 118-12(k)(2) provides: (2) Vertical type seawalls or bulkheads shall be permitted only to stabilize severely eroding shorelines and only on manmade canals, channels, or basins. Such seawalls or bulkheads shall be permitted only if native vegetation and/or riprap and filter cloth is not a feasible means to control erosion. No new seawalls, bulkheads, or other hardened vertical structures shall be permitted on open water. Section 122-4(b)(5), in relevant part, provides: Coastal high-hazard areas (V zones). Within the areas of special flood hazard are areas designated as coastal high- hazard areas, which have special flood hazards associated with wave wash. The following provisions shall apply in these areas: * * * e. There shall be no fill used as structural support. Section 130-157, Maximum Permanent Residential Density and Minimum Required Open Space, provides at note (a): (a) The allocated densities for submerged lands, salt ponds, freshwater ponds, and mangroves shall be 0 and the maximum net density bonuses shall not be available. Section 130-162, Maximum Densities for Hotel/Motel, Campground, Recreational Vehicle, Seasonal and Institutional Residential Uses, and Minimum Open Space, proves at note (a): (a) The allocated densities for submerged lands, salt ponds, freshwater ponds, and mangroves shall be 0 and the maximum net density bonuses shall not be available. Ms. Powell persuasively testified that the Project was not consistent with the County's LDC regulations in sections 118-4, 118-10(e), 118-12(k)(2), 122- 4(b)(5), 130-157, and 130-162. The Project was inconsistent with the cited LDC regulations because it sought to construct seawall in submerged land, fill portions of the lots subject to a 100% open space requirement, remove the entirety of the existing mangrove fringe, impair 100% of the marine seagrass resources within the Subject Lots, and utilize structural fill within a Federal Emergency Management Agency (FEMA) designated Velocity Zone. The preponderance of the evidence demonstrated that the Project did not meet the criteria of part IV of chapter 62-312 and section 380.0552. The testimony also demonstrated that Petitioner did not apply for a variance or waiver of the County's LDC regulations. Conditions for Issuance Petitioner generally argued that the five applications provided reasonable assurance for issuance of individual ERPs. However, the persuasive and credible evidence established that the Project did not satisfy a majority of the conditions for issuance under rule 62-330.301. Petitioner failed to provide adequate information regarding stormwater management, the impacts of runoff to Floral Avenue, and runoff flowing back into the Gulf of Mexico OFW. This failure resulted in a lack of reasonable assurance that the Project would not cause adverse flooding to on-site or off-site property; would not cause adverse water quantity impacts to receiving waters and adjacent lands; and would not adversely affect the quality of receiving waters. The preponderance of the evidence demonstrated that the Project would adversely impact the value of functions provided to fish and wildlife and listed species by wetlands and other surface waters. Those functions would be 100% impacted and the impacts would not be adequately offset by appropriate mitigation. As found above, the Project would cause adverse secondary impacts to the water resources, adverse impacts to surface water conveyance, and the adverse impacts would not be adequately offset by appropriate mitigation. Additional Conditions for Issuance Petitioner generally contended that the five applications provided reasonable assurance that the Project was clearly in the public interest under rule 62-330.302. However, the persuasive and credible evidence established that the Project did not satisfy a majority of the applicable additional conditions for issuance. The Project would adversely affect the public health, safety, or welfare or the property of others because Petitioner failed to provide adequate information regarding stormwater management. DEP's site inspection found no stormwater management or treatment system on the side of Floral Avenue adjacent to the Subject Lots. Thus, the collected and directed stormwater would end up flowing back into the mangrove fringe and the OFW. The preponderance of the evidence demonstrated that the Project would adversely affect the conservation of fish and wildlife, or their habitat, as a result of the 100% impact to benthic communities, which would not be adequately offset by appropriate mitigation. The preponderance of the evidence demonstrated that the Project would adversely affect marine productivity, the current condition, and the relative value of functions being performed by the impacted areas. Also, the Project would be permanent in nature. The preponderance of the evidence demonstrated that Petitioner failed to provide reasonable assurance that there would not be harmful erosion or shoaling. The Project would not adversely affect or enhance any significant historical and archaeological resources. The Project would not be within a recognized cumulative impact basin of the SFWMD for mitigation of impacts purposes. Contiguous lots to the Subject Lots owned by Petitioner could be developed through similar requests in the future. Each ERP application's cumulative impact analysis would consider the other four ERP applications as in-house examples of potential future projects. Thus, Petitioner did not provide reasonable assurance that each ERP application would not cause unacceptable cumulative impacts upon wetlands and other surface waters.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is, RECOMMENDED that DEP enter a final order denying Petitioner's five ERP applications. DONE AND ENTERED this 14th day of April, 2021, in Tallahassee, Leon County, Florida. S FRANCINE M. FFOLKES Administrative Law Judge 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 14th day of April, 2021. COPIES FURNISHED: Kathryn E.D. Lewis, Esquire Department of Environmental Protection Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399 Jay Patrick Reynolds, Esquire Department of Environmental Protection Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399 William Moore, Esquire Moore Bowman & Reese, P.A. Suite 100 551 North Cattlemen Road Sarasota, Florida 34232 Justin G. Wolfe, General Counsel Department of Environmental Protection Legal Department, Suite 1051-J Mail Station 35 Douglas Building 3900 Commonwealth Boulevard Tallahassee, Florida 32399 Jon F. Morris, Esquire Brandon W. White, Esquire Department of Economic Opportunity 107 East Madison Street, Mail Station 110 Tallahassee, Florida 32399 Lea Crandall, Agency Clerk Department of Environmental Protection Douglas Building, Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399 Noah Valenstein, Secretary Department of Environmental Protection Douglas Building 3900 Commonwealth Boulevard Tallahassee, Florida 32399 Valerie A. Wright, Esquire Department of Economic Opportunity 107 East Madison Street Tallahassee, Florida 32399

Florida Laws (14) 120.52120.569120.57120.68267.061373.042373.086373.413373.414373.428380.05380.0552380.23403.813 Florida Administrative Code (8) 62-302.30062-312.40062-312.41062-312.44062-312.45062-330.30162-330.30262-4.242 DOAH Case (5) 20-065920-066020-066120-066220-0663
# 5
RIVER TRAILS, LTD. vs. DEPARTMENT OF ENVIRONMENTAL REGULATION, 85-000329RX (1985)
Division of Administrative Hearings, Florida Number: 85-000329RX Latest Update: Apr. 08, 1985

Findings Of Fact Petitioner River Trails is the developer of a condominium community in Palm Beach County known as River Walk. River Walk is contiguous to and immediately adjacent to 2600 feet of South Florida Water Management District (hereinafter "SFWMD") property bordering Canal C-18 in Palm Beach County. The right- of-way adjacent to C-18 as well as the bottom of C-18 is owned by SFWMD. C-18 is not in an area designated as Outstanding Florida Waters. As required by Section 403.813(2), Florida Statutes, River Trails sought and obtained on January 12, 1984, a permit from the SFWMD to construct a dock and boat ramp in Canal C-18. The permit conveyed no property rights to River Trails. On October 12, 1984, River Trails asked DER to confirm that River Trails' proposed boat ramp qualified for an exemption pursuant to Section 403.813(2)(c), Florida Statutes. By letter dated December 20, 1984, DER informed River Trails that the proposed boat ramp did qualify for the exemption and, therefore did not require any permit from DER. On October 18, 1984, River Trails asked DER to confirm that River Trails' proposed dock of 1,000 square feet or less qualified for an exemption from DER's permitting authority pursuant to Section 403.813(2)(b), Florida Statutes. However, on November 30, 1984, DER informed River Trails that its proposed dock did not qualify for the exemption because there was already an existing dock on SFWMD property on Canal C-18. As authority for its position, DER cited the following sentence in DER Rule 17-4.04(9)(c), Florida Administrative Code: "A private dock is a single pier at a parcel of property." On the 2600 feet of SFWMD-owned right-of-way contiguous to River Trails, there are presently no docks. On SFWMD-owned right-of-way east of River Trails, between River Trails and the southwest fork of the Loxahatchee River, there are two docks approximately 300 feet apart located in front of single-family residences. DER contends all contiguous property owned by an individual, group or entity, including a water management district, constitutes a "parcel of property" and accordingly does not recognize River Trails' claim to an exemption because of the existence of these docks. Prior to River Trails' request that DER confirm River Trails' right to an exemption, DER had not interpreted water management district-owned right-of-ways to be a "parcel of property" within the meaning of Rule 17- 4.04(9)(c). In the past, the SFWMD has permitted numerous docks of less than 1,000 square feet on SFWMD-owned right- of-ways. Copies of these permits were routinely forwarded to DER. While these docks were and are on right-of-ways which DER now defines as a "parcel" within the meaning of Rule 17-4.04(9)(c), DER has not required permits for these docks. The DER employees who interpret the rule in question as part of their duties and whose depositions were introduced at hearing do not agree on the configuration which constitutes a single pier, on the degree of ownership or control required over a parcel of property by an applicant for an exemption, or on the definition of a parcel of property. DER has failed to adequately explain its deviation from past agency practice in interpreting SFWMD right-of- way as a parcel of property. But for DER's new interpretation of the term "parcel of property" found in Rule 17-4.04(9)(c), Florida Administrative Code, River Trails' proposed dock meets the statutory and rule requirements for an exemption from obtaining a permit from DER.

Florida Laws (5) 120.52120.54120.56120.68403.813
# 6
STANDARD SAND AND SILICA COMPANY vs. SOUTHWEST FLORIDA REGIONAL PLANNING COUNCIL, 75-002154 (1975)
Division of Administrative Hearings, Florida Number: 75-002154 Latest Update: Mar. 21, 1977

Findings Of Fact Application No. 75-00196 is a request by the Standard Sand and Silica Company, for a consumptive water use permit. This application is for an existing use involving withdrawal from one well. The application seeks an average daily withdrawal of 1.6925 million gallons per day and a maximum daily withdrawal of 2.16 million gallons per day. The sought-for withdrawal will not exceed the water crop as defined by the district, with the withdrawal consumptively using only 35 percent of the water crop. The water will be used on site for the washing of sand. Mr. Clifton W. Golden is an adjacent landowner who testified that he was afraid of salt water intrusion and that a sink hole might develop because of the vast quantities of water taken from the aquifer by the applicant. He does not feel that the issuance of a permit would be consistent with the public interest. He presented no hydrological data showing that issuance of the permit would adversely affect his property. Mary Fausteen Thompson is a property owner adjacent to the site from which the water will be taken. She has had problems in the past with Standard Sand and Silica Company apparently discharging excess water on to her property. She thinks those problems may be occurring again, causing some of her property to be flooded. The sought-for consumptive use will not significantly induce salt water intrusion. Except as otherwise noted in the findings of fact, none of the conditions set forth in Subsection 16J-2.11(2), (3) or (4), F.A.C., will be violated. Several letters of objections have been received in addition to the objectors noted above. The Southwest Florida Water Management District's staff recommends issuance of the subject permit in the amounts requested with the following conditions: That no off-site runoff be permitted by the applicant. That flowmeters be placed on the well and quarterly reports made to the district.

Recommendation It is hereby RECOMMENDED that Application No. 75-00196 be granted with the conditions set forth in paragraph 7 above. ENTERED this 28th day of May, 1976, in Tallahassee, Florida. CHRIS H. BENTLEY, Hearing Officer Division of Administrative Hearings Room 530, Carlton Building Tallahassee, Florida 32304 (904) 488-9675 COPIES FURNISHED: Jay T. Ahern, Esquire Southwest Florida Water Management District P.O. Box 457 Brooksville, Florida 33512 Eugene W. Harris Standard Sand and Silica Co. P.O. Box 35 Davenport, Florida 33837 Mrs. Mary Fausteen Thompson Box 82-C, Evans Road Polk City, Florida Mr. Clifton W. Golden 800 Oriole Drive Virginia Beach, Florida 23451 Mr. John C. Jones Executive Director Florida Wildlife Federation 4080 North Haverhill Road West Palm Beach, Florida 33407

Florida Laws (2) 373.019373.226
# 7
DR. OCTAVIO BLANCO vs GPG, INC AND SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT, 08-003053 (2008)
Division of Administrative Hearings, Florida Filed:Tampa, Florida Jun. 23, 2008 Number: 08-003053 Latest Update: Nov. 19, 2008
Florida Laws (3) 120.569120.59557.105 Florida Administrative Code (2) 28-106.20140D-4.101
# 8
A. WAYNE LUJAN vs DEPARTMENT OF ECONOMIC OPPORTUNITY AND DEPARTMENT OF ENVIRONMENTAL PROTECTION, 20-000660 (2020)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Feb. 06, 2020 Number: 20-000660 Latest Update: Jul. 04, 2024

The Issue The issue to be decided in these cases is whether Petitioner, A. Wayne Lujan (Petitioner), was entitled to issuance of five environmental resource permits (ERPs) that Respondent, Department of Environmental Protection (DEP), intended to deny as stated in notices of denial dated October 25, 2019.

Findings Of Fact The following Findings of Fact are based on the stipulations of the parties and the evidence adduced at the final hearing. Parties and Background Petitioner Lujan is the president and a director of Kay Haven Associated Enterprises, Inc. (Key Haven), that owns the five parcels, which are the subject matter of this hearing. Although Key Haven owns numerous lots, it chose to submit ERP applications for the Subject Lots within the Key Haven Tenth Addition plat dated September 1966 (Plat). See Joint Exhibit 84. Joint Exhibit 84 The Subject Lots are located in an unincorporated part of the County on the northwestern edge of a body of land lying north of State Road A1A, identified on the Plat as Raccoon Key. The Subject Lots are approximately half a mile east of the city limits of Key West, Florida. The Subject Lots are all characterized by a small upland portion adjacent to Floral Avenue. The majority of the Subject Lots transition into a mangrove fringe of varying depth and submerged lands containing marine seagrasses and sponges. See Joint Exhibits 81 and 82. Joint Exhibit 81 Joint Exhibit 82 DEP is the administrative agency of the state having the power and duty to protect Florida's air and water resources, and to administer and enforce the provisions of part II of chapter 380, part IV of chapter 373, and chapter 403, Florida Statutes. DEP also administers the provisions of Florida Administrative Code chapters 62-312 and 62-330 regarding activities in wetlands and other surface waters of the state. DEO is the state land planning agency and reviews certain permit applications for consistency with its statutory responsibilities under the Florida Coastal Management Program (FCMP), which includes part II of chapter 163, and part I of chapter 380, Florida Statutes. Relevant to this proceeding, DEO exercises authority over the ACSC program. See § 380.05, Fla. Stat. On July 26, 2018, Petitioner filed five applications for ERPs with DEP. Although certain details within each application differed, the applications all sought to authorize construction of a seawall in the waters of the Gulf of Mexico and in unnamed wetlands within the landward extent of the Gulf of Mexico, a Class III OFW, to remove the entirety of the existing mangrove fringe, and to place fill within wetlands and other surface waters for the construction of single-family residences (Project). The minor differences in each application relate to the length of the seawall and the amount of fill necessary for each lot. Although some testimony was provided concerning the differences, no party argued that the differences were material to the determinations necessary in this proceeding. Accordingly, the factual and legal analysis for the Subject Lots and ERP applications were addressed without distinction herein. DEP forwarded a copy of the applications to DEO for its recommendation. On August 24, 2018, DEO issued objections to approval of the permits citing inconsistency with the Florida Keys ACSC Principles for Guiding Development (PGDs) in section 380.0552(7). DEO also objected based on inconsistencies between the Project and the Monroe County Comprehensive Plan (Comp Plan) and Land Development Code (LDC), which implement the PGDs. DEP's first RAI dated August 24, 2018, included DEO's objections. The first RAI notified Petitioner that DEP had concerns with the Project that included: (1) installation of the vertical seawall; (2) placement of fill within an OFW; (3) direct impacts to marine seagrass bed community without adequate mitigation; and (4) failure to provide stormwater management plans since the Project was a common plan of development. The first RAI contained 19 specific requests for additional information. On October 23, 2018, Petitioner responded to DEP's first RAI by submitting slightly revised plans. The revised Project proposed less of a vertical seawall footprint by adding rip-rap to the side seawalls as a means of containing fill. Petitioner's responses to the 19 specific requests for information can generally be categorized as follows: (1) elimination of some vertical seawalls, but not the ones on the waterward edge of the Subject Lots; (2) no change in the placement of fill; (3) Petitioner would attempt to find appropriate compensatory mitigation for the seagrass impacts; and (4) Petitioner did not consider the Project to be a common plan of development. Regarding DEO's objections, Petitioner stated that "[w]e acknowledge that the project has been forwarded to FWC [Florida Fish and Wildlife Conservation Commission] and DEO and that additional comments and information may be requested by those agencies in order to fully evaluate the application." Petitioner did not substantively address DEO's objections. DEP issued a second RAI on November 21, 2018. DEO again objected in a letter dated November 26, 2018. DEP's second RAI raised the same concerns as the first RAI and acknowledged that four of the 19 specific items were adequately addressed. On January 11, 2019, Petitioner responded to DEP's second RAI by again submitting slightly revised site plans. However, the Project remained generally unchanged, with a proposed vertical seawall on the waterward edge of the lots, rip-rap along the sides, removal of the entire mangrove fringe, and fill of the entire lots eliminating the existing marine seagrasses. DEP issued a third RAI to Petitioner on February 8, 2019. DEO reiterated its objections by letter dated February 8, 2019. The third RAI raised the same concerns as the first and second RAIs, although DEP acknowledged that six of the 19 specific items were adequately addressed. By letter dated April 8, 2019, Petitioner responded to DEP's third RAI. The response again proposed slightly altered site plans from the January 2019 submissions. Petitioner essentially stated that mitigation opportunities were scarce, but had contacted the County and was looking into derelict vessel removal. However, the proposed Project remained generally unchanged, with a proposed vertical seawall on the waterward edge of the lots, rip-rap along the sides, removal of the entire mangrove fringe, and fill of the entire lots eliminating the existing marine seagrasses. As it relates to DEO's objections, Petitioner responded that "[a]fter review of the comments outlined in the [DEO] revised letter, it seems that the DEO objections are related to compliance with the provision[s] of the [Monroe] County [Comp Plan]. We will deal with those issues at the time of local permitting." Petitioner again failed to substantively address DEO's objections. DEP issued its final RAI on May 8, 2019. DEO again objected by letter dated May 6, 2019. This final RAI raised the same concerns as the first, second, and third RAIs. DEP stated that seven of the 19 specific items were not addressed by Petitioner, and that failure to provide a complete response to the prior RAI may result in denial of the ERP applications. On August 29, 2019, Petitioner responded to DEP's final RAI by once again submitting slightly revised plans, and additional information concerning mitigation proposals. However, the Project did not change and Petitioner again failed to substantively address DEO's objections. DEO’s objection letter identified that the ERP applications were inconsistent with the Florida Keys ACSC PGDs, seven Comp Plan policies, and six regulatory provisions of the County's LDC. DEP denied the ERP applications on October 25, 2019. The grounds for denial reiterated the issues not addressed by Petitioner's RAI responses. Specifically: (1) the failure of the Project to provide reasonable assurances concerning direct, secondary, and cumulative impacts to the marine seagrass bed community; (2) continued reliance upon construction of a vertical seawall; (3) failure to provide stormwater management information necessary given the determination that the Project constituted a common plan of development; (4) inconsistency with the FCMP as identified by DEO in its objection letters; and (5) failure to provide reasonable assurances that the Project was clearly in the public interest. Direct Impacts The Project proposed to entirely fill the Subject Lots, contain the fill with vertical seawalls and rip-rap, and construct pile-supported single-family residences. The Project would remove the entire mangrove fringe that aerials and site inspections show is a healthy mix of red, black, and white mangroves along with some green buttonwood. The shallow, open surface waters are dominated by marine seagrasses that vary in density. Petitioner did not make any design modifications to the Project that sought to reduce or eliminate direct impacts to the mangrove fringe and marine seagrasses. Petitioner's resource inventory was done using GIS aerial photography so that the aerial benthic resource surveys submitted to DEP were not ground- truthed. DEP staff conducted physical site inspections and ground-truthing inspections that included swimming in the open surface waters. DEP staff found significant marine seagrasses and sponges that were not mentioned in Petitioner's resource surveys. Depending on the lot, the Project would fill approximately 6,000 square feet of wetlands and other surface waters, i.e., 900 to 2,500 square feet of mangrove habitat and 4,000 to 4,800 square feet of marine seagrass bed habitat. The seawalls depicted in the final version of Petitioner's site plans were "vertical seawalls" because the rip-rap would not face the seawalls to the mean high water line (MHWL). The rip-rap would be placed on submerged resources inside the property lines of the Subject Lots. Also, Petitioner's final plans did not include the mooring of vessels. Vertical seawalls are prohibited in the OFW of the County. Petitioner did not affirmatively demonstrate that fill or shoreline stabilization could be accomplished by using native vegetation instead of vertical seawalls. Secondary Impacts DEP's expert witness, Ms. Mills, testified that Petitioner's ERP applications did not identify any potential secondary impacts. Ms. Mills testified that the expected secondary impacts from the Project included stormwater runoff, shading, and erosion or shoaling. Although the Project plans showed that stormwater would be collected and directed to Floral Avenue, DEP's investigation established that there is no stormwater management system on the side of Floral Avenue abutting the Subject Lots. Thus, the collected and directed stormwater would end up flowing back into the mangrove fringe and surface waters at the lot locations that were not proposed for development, e.g., Lots 36 and 38. The proposed single-family homes are piling-supported structures. Ms. Mills testified that the piling-supported structure would cause shading of the immediate adjacent resources on either side. She identified potential shading impacts to the resources of the undeveloped Lots 36 and 38. In addition, Ms. Mills identified potential erosion or shoaling impacts to the undeveloped Lots 36, 38, and unnamed lots to the left of Lot 40 since they would be surrounded by developed fill on either side. Although Mr. Swakon testified that tidal velocity is low in this area, other aspects, such as effects from wind-driven circulation, were not adequately addressed. Mitigation Petitioner was required to propose mitigation to offset remaining direct and secondary impacts after going through a reduction and elimination exercise. However, Petitioner did not propose any revisions to the Project to reduce or eliminate the direct and secondary impacts identified above. Ms. Mills explained that appropriate mitigation usually provides benefits to the same type of ecological community as the one being impacted. Petitioner's ultimate mitigation proposal was to purchase saltwater credit at a mitigation bank, the Florida Power and Light Everglades Mitigation Bank (FPL EMB). The FPL EMB is located on the mainland of Florida approximately a hundred miles away from the Subject Lots. Ms. Mills testified that saltwater credit would be appropriate to offset and replace the same ecological function of mangroves, but not to offset the submerged benthic communities that would be impacted by the Project. Mr. Swakon testified that calculation of the amount of mitigation credits included a multiplier to address secondary and cumulative impacts, the out-of-kind mitigation, and the dissimilarities in the communities. However, Ms. Mills persuasively testified that the proposed multiplier was not sufficient to justify the three aspects of impact that needed to be offset. Whether to justify dissimilarities between the ecological communities, secondary and cumulative impacts, or the distance of the mitigation site from the Project, the multiplier was not sufficient. Cumulative Impacts The Project is not within a recognized cumulative impact basin of the South Florida Water Management District (SFWMD) for mitigation of impacts purposes. Accordingly, Ms. Mills testified that the plain language of a cumulative impacts analysis is considered. Contiguous lots to the Subject Lots owned by Petitioner could be developed through similar requests in the future. Also, each ERP application's cumulative impact analysis would consider the other four ERP applications as in-house examples of potential future projects. Common Plan of Development Petitioner contested DEP's conclusion that the Project was a common plan of development subject to section 2.0 of the Applicant's Handbook Volume 1 and associated stormwater management requirements. The Project would facilitate the advancement of land uses such as multiple residences, a residential subdivision, or phased site development. The Project comprised a total land area divided into multiple lots or parcels that are under common ownership or control. In total, Petitioner owns 648 lots under common ownership within the Key Haven Tenth and Eleventh Addition. The Subject Lots are all part of a residential subdivision. Thus, the preponderance of the evidence demonstrated that the Project was a common plan of development. For this common plan of development, Petitioner's proposed stormwater management consisted of a cap on the proposed seawalls directing stormwater to swales on each lot. The swales would then direct stormwater to Floral Avenue with no additional treatment or management. During site inspections, DEP staff did not find any evidence of stormwater management along Floral Avenue. Seawalls and Rip-rap The seawalls depicted in the final version of Petitioner's ERP applications would be vertical seawalls because the rip-rap facing the seawall did not come above the MHWL. In addition, the final plans did not include the mooring of vessels. As found above, the Project would place fill, seawalls, and rip-rap on marine seagrasses and sponges. Petitioner failed to affirmatively demonstrate that native vegetation was not sufficient to prevent erosion. The evidence established that Petitioner did not apply for any waiver or variance of applicable ERP rule criteria. FCMP Consistency The evidence demonstrated that Petitioner refused to address DEO's objections based on a mistaken view of the criteria governing ERP applications in the County and the Florida Keys ACSC. Relevant to this proceeding, DEO exercises authority over the ACSC program. See § 380.05, Fla. Stat.; see also § 380.23(6), Fla. Stat. (Each agency charged with implementing statutes and rules that are part of the FCMP, shall be afforded an opportunity to provide DEP with its comments and determination regarding consistency of the activity with those statutes and rules.). Section 380.05(16) prohibits persons from undertaking any development within the Florida Keys ACSC, except in accordance with the PGDs. Thus DEO, as the administrator of the ACSC program, reviewed the ERP applications for consistency with applicable regulatory requirements. DEO issued objections to approval of the permits citing inconsistency with the Florida Keys ACSC PGDs; and inconsistencies between the Project and the County's Comp Plan and LDC which implement the PGDs. DEO identified that the Project would be inconsistent with four PGDs. DEO's expert witness, Ms. Powell, testified that the Project was inconsistent with the PGD, which provides for strengthening local government capabilities for managing land use and development so that the local government is able to achieve these objectives without continuing the ACSC designation. See § 380.0552(7)(a), Fla. Stat. Ms. Powell persuasively testified that the ERP applications were inconsistent with this PGD because the Project would impair the local government's ability to have the ACSC designation removed. Allowing development inconsistent with its regulations would hurt the local government's ability to pursue de-designation. No evidence was presented by Petitioner that the Project would be consistent with this PGD. The second PGD cited by DEO provides for protecting shoreline and marine resources, including mangroves, coral reef formations, seagrass beds, wetlands, fish and wildlife, and their habitat. See § 380.0552(7)(b), Fla. Stat. It was undisputed that the Project would result in total removal of the mangrove and buttonwood fringe on each lot and 100% destruction of existing submerged marine resources. No evidence was presented by Petitioner that the Project would be consistent with this PGD. The third PGD cited by DEO provides for limiting the adverse impacts of development on the quality of water throughout the Florida Keys. See § 380.0552(7)(e), Fla. Stat. Ms. Powell testified that degradation to nearshore water quality from prior dredge and fill activity was one of the reasons for the designation of the Florida Keys as an ACSC. Additionally, as further discussed below, the Project would be inconsistent with the County's Comp Plan policies and LDC regulations that further the goal of protecting the quality of water throughout the Florida Keys ACSC. No evidence was presented by Petitioner that the Project would be consistent with this PGD. The fourth PGD cited by DEO provides for protecting the public health, safety, and welfare of the citizens of the Florida Keys, and maintaining the Florida Keys as a unique Florida resource. See § 380.0552(7)(n), Fla. Stat. As further discussed below, the Project would be inconsistent with the County's Comp Plan and LDC regulations that prohibit the use of structural fill within velocity zones. No evidence was presented by Petitioner that the Project would be consistent with this PGD. Ms. Powell testified that DEO considered the remaining statutory PGDs, and determined they were not particularly applicable to these ERP applications. In accordance with its duties, DEO had also reviewed and approved the County's Comp Plan and LDC as consistent with the statutory PGDs. DEO identified that the Project would be inconsistent with seven Comp Plan policies. They are Policies 102.1.1, 101.5.25, 203.1.1, 204.2.2, 204.2.3, 204.2.4, and 212.5.3. Policy 102.1.1 provides: The County shall protect submerged lands and wetlands. The open space requirement shall be one hundred (100) percent of the following types of wetlands: submerged lands mangroves salt ponds fresh water wetlands fresh water ponds undisturbed salt marsh and buttonwood wetlands Allocated density (dwelling units per acre) shall be assigned to freshwater wetlands and undisturbed salt marsh and buttonwood wetlands only for use as transferable development rights (TDRs) away from these habitats. Submerged lands, salt ponds, freshwater ponds, and mangroves shall not be assigned any density or intensity. Policy 101.5.25 provides that "[t]he allocated densities for submerged lands, salt ponds, freshwater ponds, and mangroves shall be 0 and the maximum net density bonuses shall not be available." Policy 203.1.1 provides that "[t]he open space requirement for mangrove wetlands shall be one hundred (100) percent. No fill or structures shall be permitted in mangrove wetlands except for elevated, pile-supported walkways, docks, piers and utility pilings." Policy 204.2.2 provides: To protect submerged lands and wetlands, the open space requirement shall be 100 percent of the following types of wetlands: submerged lands; mangroves; salt ponds; freshwater wetlands; freshwater ponds; and undisturbed salt marsh and buttonwood wetlands. Allocated density (dwelling units per acre) shall be assigned to freshwater wetlands and undisturbed salt marsh and buttonwood wetland only for use as transferable development rights away from these habitats. Submerged lands, salt ponds, freshwater ponds and mangroves shall not be assigned any density or intensity. Within one (1) year after the adoption of the 2030 Comprehensive Plan, the County shall revise the LDC to include a prohibition of development in salt ponds. Policy 204.2.3 provides: No structures shall be permitted in submerged lands, mangroves, salt ponds, or wetlands, except for elevated, pile-supported walkways, docks, piers, and utility pilings. No fill shall be permitted in submerged lands, mangroves, salt ponds, or wetlands except: as specifically allowed by Objective 212.5 and subsequent Policies; to fill a manmade excavated water body, such as a canal, boat ramp, or swimming pool if the Director of Environmental Resources determines that such filling will not have a significant adverse impact on marine or wetland communities; or as needed for shoreline stabilization or beach renourishment projects with a valid public purpose that furthers the goals of the Monroe County Comprehensive Plan, as determined by the County. Policy 204.2.4 provides: No fill or structures shall be permitted in mangroves or wetlands except as allowed by Policy 204.2.3 (as amended) and for bridges extending over mangroves or wetlands that are required to provide automobile or pedestrian access to dwelling units located on upland areas within the same property for which there is no alternative means of access. Such bridges shall be elevated on pilings such that the natural movement of water, including volume, rate, and direction of flow shall not be disrupted or altered. Upland areas shall include disturbed wetlands that have been lawfully converted into uplands through filling. Policy 212.5.3 provides: Bulkheads, seawalls or other hardened vertical shoreline structures shall be permitted on residential canals and altered shorelines only in the following situations: to replace an existing deteriorated bulkhead or seawall; or to stabilize a severely eroding shoreline area. DEO's expert witness, Ms. Powell, persuasively testified that the Project was inconsistent with all seven policies, because it did not protect the submerged lands and wetlands, did not provide for 100% open space within the submerged lands and wetlands, and provided for the construction of a seawall not excepted from the general prohibition. Petitioner did not present any evidence that the Project was consistent with the cited policies. Instead, Petitioner's witness, Mr. Nelson, testified that he felt certain County regulations would militate in favor of allowing the development. The main factor cited by Mr. Nelson was that the Subject Lots were designated as Tier III parcels under the County's LDC. However, designation of a parcel as Tier III did not conflict with the policies cited by DEO. The more credible and persuasive evidence concerning the Project's compliance with the Comp Plan policies was provided by Ms. Powell, who concluded that the Project was not consistent with those policies. DEO identified that the Project would be inconsistent with six sections of the County's LDC regulations. Those are sections 118-4, 118-10(e), 118-12(k)(2), 122-4(b)(5), 130-157, and 130-162. The LDC regulations are more specific methods for implementing the Comp Plan policies outlined above. Section 118-4 provides: No development activities, except as provided for in this chapter, are permitted in submerged lands, mangroves, salt ponds, freshwater wetlands, freshwater ponds, or in undisturbed salt marsh and buttonwood wetlands; the open space requirement is 100 percent. Allocated density (dwelling units per acre) shall be assigned to freshwater wetlands and undisturbed salt marsh and buttonwood wetlands only for use as transferable development rights away from these habitats. Submerged lands, salt ponds, freshwater ponds and mangroves shall not be assigned any density or intensity. Section 118-10(e), in relevant part, provides: Mangroves, wetlands, and submerged lands. All structures developed, used or occupied on land classified as mangroves, wetlands or submerged lands (all types and all levels of quality) shall be designed, located and constructed such that: Generally. Only docks and docking facilities, boat ramps, walkways, water access walkways, water observation platforms, boat shelters, nonenclosed gazebos, riprap, seawalls, bulkheads, and utility pilings shall be permitted on or over mangroves, wetlands, and submerged lands, subject to the specific restrictions of this subsection. Trimming and/or removal of mangroves shall meet Florida Department of Environmental Protection requirements. * * * (4) Placement of fill. No fill shall be permitted in any mangroves, wetlands, or submerged lands except: As specifically allowed by this Section or by Section 118- 12(k) (Bulkheads, Seawalls, Riprap) and 118-12(l) (Boat Ramps); To fill a manmade, excavated water body such as a canal, boat ramp, boat slip, boat basin or swimming pool if the County Biologist determines that such filling will not have a significant adverse impact on marine or wetland communities; As needed for shoreline stabilization or beach renourishment projects with a valid public purpose that furthers the goals of the Monroe County Comprehensive Plan, as determined by the County Biologist; For bridges extending over salt marsh and/or buttonwood association wetlands that are required to provide automobile or pedestrian access to lawfully established dwelling units located on upland areas within the same property for which there is no alternate means of access. Such bridges shall be elevated on pilings so that the natural movement of water, including volume, rate and direction of flow shall not be disrupted or altered; or As approved for Disturbed Salt Marsh and Buttonwood Association Wetlands with appropriate mitigation as defined by the wetland regulations of subsection (e)(6) of this Section. Section 118-12(k)(2) provides: (2) Vertical type seawalls or bulkheads shall be permitted only to stabilize severely eroding shorelines and only on manmade canals, channels, or basins. Such seawalls or bulkheads shall be permitted only if native vegetation and/or riprap and filter cloth is not a feasible means to control erosion. No new seawalls, bulkheads, or other hardened vertical structures shall be permitted on open water. Section 122-4(b)(5), in relevant part, provides: Coastal high-hazard areas (V zones). Within the areas of special flood hazard are areas designated as coastal high- hazard areas, which have special flood hazards associated with wave wash. The following provisions shall apply in these areas: * * * e. There shall be no fill used as structural support. Section 130-157, Maximum Permanent Residential Density and Minimum Required Open Space, provides at note (a): (a) The allocated densities for submerged lands, salt ponds, freshwater ponds, and mangroves shall be 0 and the maximum net density bonuses shall not be available. Section 130-162, Maximum Densities for Hotel/Motel, Campground, Recreational Vehicle, Seasonal and Institutional Residential Uses, and Minimum Open Space, proves at note (a): (a) The allocated densities for submerged lands, salt ponds, freshwater ponds, and mangroves shall be 0 and the maximum net density bonuses shall not be available. Ms. Powell persuasively testified that the Project was not consistent with the County's LDC regulations in sections 118-4, 118-10(e), 118-12(k)(2), 122- 4(b)(5), 130-157, and 130-162. The Project was inconsistent with the cited LDC regulations because it sought to construct seawall in submerged land, fill portions of the lots subject to a 100% open space requirement, remove the entirety of the existing mangrove fringe, impair 100% of the marine seagrass resources within the Subject Lots, and utilize structural fill within a Federal Emergency Management Agency (FEMA) designated Velocity Zone. The preponderance of the evidence demonstrated that the Project did not meet the criteria of part IV of chapter 62-312 and section 380.0552. The testimony also demonstrated that Petitioner did not apply for a variance or waiver of the County's LDC regulations. Conditions for Issuance Petitioner generally argued that the five applications provided reasonable assurance for issuance of individual ERPs. However, the persuasive and credible evidence established that the Project did not satisfy a majority of the conditions for issuance under rule 62-330.301. Petitioner failed to provide adequate information regarding stormwater management, the impacts of runoff to Floral Avenue, and runoff flowing back into the Gulf of Mexico OFW. This failure resulted in a lack of reasonable assurance that the Project would not cause adverse flooding to on-site or off-site property; would not cause adverse water quantity impacts to receiving waters and adjacent lands; and would not adversely affect the quality of receiving waters. The preponderance of the evidence demonstrated that the Project would adversely impact the value of functions provided to fish and wildlife and listed species by wetlands and other surface waters. Those functions would be 100% impacted and the impacts would not be adequately offset by appropriate mitigation. As found above, the Project would cause adverse secondary impacts to the water resources, adverse impacts to surface water conveyance, and the adverse impacts would not be adequately offset by appropriate mitigation. Additional Conditions for Issuance Petitioner generally contended that the five applications provided reasonable assurance that the Project was clearly in the public interest under rule 62-330.302. However, the persuasive and credible evidence established that the Project did not satisfy a majority of the applicable additional conditions for issuance. The Project would adversely affect the public health, safety, or welfare or the property of others because Petitioner failed to provide adequate information regarding stormwater management. DEP's site inspection found no stormwater management or treatment system on the side of Floral Avenue adjacent to the Subject Lots. Thus, the collected and directed stormwater would end up flowing back into the mangrove fringe and the OFW. The preponderance of the evidence demonstrated that the Project would adversely affect the conservation of fish and wildlife, or their habitat, as a result of the 100% impact to benthic communities, which would not be adequately offset by appropriate mitigation. The preponderance of the evidence demonstrated that the Project would adversely affect marine productivity, the current condition, and the relative value of functions being performed by the impacted areas. Also, the Project would be permanent in nature. The preponderance of the evidence demonstrated that Petitioner failed to provide reasonable assurance that there would not be harmful erosion or shoaling. The Project would not adversely affect or enhance any significant historical and archaeological resources. The Project would not be within a recognized cumulative impact basin of the SFWMD for mitigation of impacts purposes. Contiguous lots to the Subject Lots owned by Petitioner could be developed through similar requests in the future. Each ERP application's cumulative impact analysis would consider the other four ERP applications as in-house examples of potential future projects. Thus, Petitioner did not provide reasonable assurance that each ERP application would not cause unacceptable cumulative impacts upon wetlands and other surface waters.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is, RECOMMENDED that DEP enter a final order denying Petitioner's five ERP applications. DONE AND ENTERED this 14th day of April, 2021, in Tallahassee, Leon County, Florida. S FRANCINE M. FFOLKES Administrative Law Judge 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 14th day of April, 2021. COPIES FURNISHED: Kathryn E.D. Lewis, Esquire Department of Environmental Protection Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399 Jay Patrick Reynolds, Esquire Department of Environmental Protection Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399 William Moore, Esquire Moore Bowman & Reese, P.A. Suite 100 551 North Cattlemen Road Sarasota, Florida 34232 Justin G. Wolfe, General Counsel Department of Environmental Protection Legal Department, Suite 1051-J Mail Station 35 Douglas Building 3900 Commonwealth Boulevard Tallahassee, Florida 32399 Jon F. Morris, Esquire Brandon W. White, Esquire Department of Economic Opportunity 107 East Madison Street, Mail Station 110 Tallahassee, Florida 32399 Lea Crandall, Agency Clerk Department of Environmental Protection Douglas Building, Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399 Noah Valenstein, Secretary Department of Environmental Protection Douglas Building 3900 Commonwealth Boulevard Tallahassee, Florida 32399 Valerie A. Wright, Esquire Department of Economic Opportunity 107 East Madison Street Tallahassee, Florida 32399

Florida Laws (14) 120.52120.569120.57120.68267.061373.042373.086373.413373.414373.428380.05380.0552380.23403.813 Florida Administrative Code (8) 62-302.30062-312.40062-312.41062-312.44062-312.45062-330.30162-330.30262-4.242 DOAH Case (5) 20-065920-066020-066120-066220-0663
# 9
JOSEPH BELANGER, PATRICIA BELANGER, JEROME STRAUSS, AND SUSAN STRAUSS vs CONQUEST DEVELOPMENTS USA L.C., AND SOUTH FLORIDA WATER MANAGEMENT DISTRICT, 02-000116 (2002)
Division of Administrative Hearings, Florida Filed:Naples, Florida Jan. 09, 2002 Number: 02-000116 Latest Update: Sep. 30, 2002

The Issue The issue is whether an Environmental Resource Permit should be issued to Conquest Developments USA, L.C., authorizing the modification of an existing stormwater management system serving a residential development known as Silver Lakes in Collier County, Florida.

Findings Of Fact Based upon all of the evidence, the following findings of fact are determined: Background In this environmental permitting dispute, Respondent, South Florida Water Management District (District), proposes to issue an Environmental Resource Permit (ERP) to Respondent, Conquest Developments USA, L.C. (Applicant), authorizing the modification of an existing stormwater management system serving a private, gated residential community known as Silver Lakes RV and Golf Club, Inc. (Silver Lakes) in unincorporated Collier County, Florida. As the agency responsible for the administration of the ERP program, the District has the authority to grant or deny the requested permit. Preliminary action approving the application was taken by the District on August 15, 2001. Silver Lakes is a 146-acre residential development located adjacent to, and on the east side of, County Road 951 approximately 1.5 miles south of the intersection of U.S. Highway 41 and County Road 951 in southwestern Collier County, Florida. The project site is a part of the larger development and consists of approximately forty undeveloped acres (40-acre site) just north of, and adjacent to, the residential community. If the application is approved, the Applicant would be allowed to construct an open storage facility on a 7.02-acre tract of land in the western part of the 40-acre site on which trailers, boats, motor homes, tow dollies, and similar items will be stored. It would also allow the Applicant to relocate previously permitted lots along the southeastern boundary of the 40-acre site which border the Silver Lakes development. Petitioners, Jerome and Susan Strauss, own Lots 14, 15, and 16 within Silver Lakes. Petitioners, Joseph H. and Patricia Belanger, own Lot 26 within Silver Lakes, which is adjacent to the proposed storage facility. For obvious reasons, the Belangers do not wish to have a storage facility next to their property. Rather, they and the other Petitioners have suggested that the storage facility be reduced in size and moved to a 3.0-acre site in the northeastern portion of the 40-acre site. The parties have stipulated that Petitioners have standing to bring this action. As reflected in the parties' Prehearing Stipulation, Petitioners contend that the proposed construction of the storage area will cause flooding, adverse secondary impacts, and adverse water quantity impacts; that the proposed activity will result in a violation of state water quality standards; that the proposed system will cause adverse impacts to surface water storage and conveyance capabilities, the value of functions provided to fish and wildlife and listed species by wetlands and other surface waters, and the conservation of fish and wildlife; that the Applicant has failed to minimize or avoid impact to jurisdictional wetlands to the greatest extent practicable; that the proposed site provides a wildlife corridor connected to protected lands directly to the west; that the proposed site is jurisdictional wetlands; that the Applicant has engaged in District activities without a permit; and that the proposed site is subject to a Declaration of Covenants, Conditions, and Restrictions. These objections, where relevant, have been grouped into five categories - wetlands, wildlife, secondary and cumulative impacts, water quality and quantity, and prior enforcement activities - and they are addressed separately below. Wetlands The District has adopted and incorporated by reference in Rule 40E-4.091(1)(a), Florida Administrative Code, a document known as the Basis of Review for Environmental Resource Permit Applications Within the South Florida Water Management District (Basis of Review). The standards and criteria found in the Basis of Review are used to determine whether an applicant has given reasonable assurances that the conditions for issuance of an ERP have been satisfied. Compliance with the criteria in the Basis of Review creates a presumption that the standard and additional conditions for issuance of an ERP in Rules 40E-4.301 and 40E- 4.302, Florida Administrative Code, respectively, have been met. See Section 1.3, Basis of Review. Section 4.2.1 of the Basis of Review generally requires that an applicant provide reasonable assurances that wetland impacts be eliminated or reduced to the greatest extent practicable. This can be done through the implementation of "practicable design modifications" to the project, or where adverse impacts still remain after such modifications, through mitigation. There are 36.82 acres of wetlands throughout the 40- acre site. If the application is approved, there will be adverse impacts to 9.9 acres of wetlands in the western portion of the site (where the storage facility will be located) and to 3.37 acres in the southeastern portion of the site. To avoid and minimize wetland impacts, the Applicant has been required to reduce the number of acres impacted from its original proposal, and to place the storage area on the western part of the 40-acre site near County Road 951. In the original application, the Applicant proposed to place the storage area in the eastern part of the site and to create a larger storage area. Although the western part of the 40-acre site contains higher quality wetlands than the central or eastern parts, the western area is not pristine, and it is substantially impacted by exotic species, such as wax myrtle and Brazilian pepper. In addition, the western area is adjacent to County Road 951, which reduces wetland functions and values, reduces habitat values because of increased light and noise encroachment, and increases risk to wildlife because of passing vehicles. Further, the central and eastern areas are adjacent to other undeveloped lands, and this creates the potential for larger tracts of preserved and enhanced wetlands and maximizes wetland functions and values. Impacts to wetlands will be adequately mitigated by the Applicant preserving and enhancing 26.92 acres within the 40-acre site in a recorded conservation easement; by monitoring and reporting on the on-site mitigation (easement) for a five-year period and by maintaining the property in perpetuity; by purchasing 3.66 mitigation credits of similar wetland habitat from the Panther Island Mitigation Bank; and by adhering to a remediation plan (found in the Special Conditions in the permit) to address any future deficiencies in the mitigation. Given these considerations, it is found that the Applicant has provided reasonable assurances that the wetland impacts from the proposed activities will be eliminated or reduced as required by Section 4.2.1 of the Basis of Review. Impact on Wildlife Section 4.2.2 of the Basis of Review requires an applicant to provide reasonable assurances that the activity will not impact the values of wetlands and other surface water functions so as to cause adverse impacts to the abundance, diversity, or habitat of fish, wildlife, and listed species. The primary agency responsible for the protection of wildlife is the Florida Fish and Wildlife Conservation Commission (Commission), and not the District. Therefore, Section 4.2.2 of the Basis of Review requires that the District provide the Commission with a copy of all ERP applications for its review and comment as to wildlife issues. In this case, the Commission offered no comments or objections regarding wildlife on the property in question. The evidence shows that listed and endangered species such as Florida panthers, wood storks, and Big Cypress fox squirrels have been spotted on infrequent occasions on the 40-acre site by residents of Silver Lake. However, the parties stipulated that there was no evidence of any nesting, denning, or breeding activity on the same site. Based on the evidence of record, including the Applicant's Protected Species Survey, it is fair to infer that there is limited or no use of the property by protected wildlife species. Indeed, Petitioners' own expert found no evidence of endangered or threatened species on the 40-acre site during his two inspections. Two Special Conditions have been incorporated into the permit to protect endangered, threatened, or other listed species. First, in the event that Big Cypress fox squirrels are observed on or near the property, Special Condition 24 requires that the Applicant prepare a habitat management plan, in consultation with the Commission, to address issues related to nesting habitat. Second, if any endangered or threatened species are ever found on the property, Special Condition 25 requires that the Applicant coordinate with the Commission or the U.S. Fish and Wildlife Commission for guidance or recommendations. Given the above, the evidence supports a finding that the Applicant has given reasonable assurances that the requirements of Section 4.2.2 of the Basis of Review have been satisfied. Secondary and Cumulative Impacts Section 4.2.7 of the Basis of Review requires that an applicant provide reasonable assurances that the proposed activity will not cause adverse secondary impacts to the water resources. At the same time, Section 4.2.8 requires that an applicant provide reasonable assurances that a regulated activity will not cause unacceptable cumulative impacts to wetlands and other surface waters within the same drainage basin as the regulated activity for which the permit is being sought. In providing the necessary reasonable assurances regarding cumulative impacts, Section 4.2.8.2 authorizes an applicant to use preservation and mitigation measures to prevent cumulative impacts. The more persuasive evidence shows that the project will not cause secondary impacts to wetlands. This is because a water quality berm system surrounds the wetlands, isolating the wetland system from the surface water management system; a 50-foot preserved area lies between the storage area and the adjacent property boundary to the north; the storage area is being placed in an area already secondarily impacted by County Road 951; and the wetland preservation area will be placed in the conservation easement. Further, the project will not cause secondary impacts to wildlife. This is because structural buffers will prevent future encroachment into the wetlands and distance any wildlife away from the more dense residential functions. These buffers include a 50-foot wide natural preserve on the north side of the storage area (Special Condition 26), an already-erected structural buffer to the south of the storage area (Special Condition 26), and a 17 to 21-foot structural buffer (planted with native vegetation or vegetated buffers) on the eastern side of the 40-acre site where the new lots are proposed. Except for two conclusionary opinion statements by Petitioners' expert, without further facts or explanation, no other evidence on secondary impacts was offered. The project will not cause cumulative impacts to the wetlands. This is because the proposed mitigation for the project adequately offsets the impacts of the 40-acre site, and the impacts from other permitted projects in the basin area have been sufficiently offset. In addition, very little property in the area remains to be developed, and there are no new applications before the District involving the same basin. In the event a new application may be filed, however, the District will require the applicant to offset any impacts associated with its project with buffers and conservation easements, like the Applicant in the instant case. Water Quantity and Quality Section 5.0 et. seq. of the Basis of Review contains water quality criteria that must be satisfied in order for an ERP to be issued, while Section 6.0 et. seq. addresses water quantity criteria for an ERP. Given the limited nature of changes to the existing system and the lack of a hydrologic connection to the wetlands, and for the following additional reasons, the Applicant has given reasonable assurances that the project complies with the water quality and quantity criteria. The project as designed includes a grass swale near the storage area on the western part of the 40-acre site. The rainfall and run-off from the storage area flows into an internal road, through the grass swale, into a storm drain, and then into the pre-existing water management system associated with the original permit for Silver Lake. The project also allows rainfall and run-off from the proposed lots on the southeastern border of the 40-acre site to sheetflow onto an internal road, where waters are collected in existing catch basins and conveyed into the previously permitted water management system associated with the original permit. Since the rainfall and run-off from the storage area and lots drain into the existing lakes (Lakes 1 and 2) that are part of the Silver Lakes water management system, those waters will be treated for water quality through wet detention before their eventual discharge to McIlvane Bay, which lies to the southwest of Silver Lake. The basin discharge rates, minimum floor elevations, road designs, parking lot designs, structure control elevations, and structure sizes are specified in the the District's Staff Report, and were set at or above the calculated design limitations to meet water quality and quantity requirements. Section 5.2.1(a)1. of the Basis of Review specifies that wet detention volume shall be provided for the first inch of runoff from the developed project. The evidence shows that the proposed system captures one inch of run-off over the entire site, which drains into the existing lake system to provide water quality treatment. The system is also designed to meet the relevant discharge rate requirements for a 25-year, 3-day storm event, and the minimum floor elevations were based on a 100-year, 3- day storm event. The wetland preserve area is outside the area served by the surface water management system, is not hydrologically connected to that system, and will not be affected by run-off from the storage area or lots. Just prior to the final hearing, the District added Special Condition 23 to create a 50-foot buffer zone along the southern boundary of the storage area for aesthetic purposes and to reduce secondary impacts. Implementation of that buffer must be in accordance with the staff report, will not change the surface water management system, will have no impact on water quality or flood control, and will be implemented after additional consultation with the District. Past Enforcement Rule 40E-4.302(2), Florida Administrative Code, requires that the District take into consideration past violations of various rules adopted by the District. No enforcement action relating to the property has ever been taken by the District against the Applicant for any violation of ERP requirements. Although Petitioners suggested that unpermitted fill activities have taken place on the southeastern part of the 40-acre site, an inspection by District personnel revealed that unpermitted activities were "not significant." Further, Special Condition 23 requires that the Applicant restore "that portion of the disturbed wetland area located in the southeast corner of the site which is to be included in the wetland preserve area." Therefore, any impacts to the 40-acre site resulting from past unpermitted activities have been considered and remedied.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the South Florida Water Management District enter a final order granting Permit Application No. 010223-5 of Conquest Developments USA, L.C., for an Environmental Resource Permit. DONE AND ENTERED this 24th day of July, 2002, in Tallahassee, Leon County, Florida. ___________________________________ DONALD R. ALEXANDER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 24th day of July, 2002. COPIES FURNISHED: Henry Dean, Executive Director South Florida Water Management District Post Office Box 24680 West Palm Beach, Florida 33416-4680 Anthony P. Pires, Jr., Esquire Woodward, Pires & Lombardo, P.A. 3200 Tamiami Trail North, Suite 200 Naples, Florida 34103-4105 Robert E. Murrell, Esquire Samouce, Murrell & Francoeur, P.A. 800 Laurel Oak Drive, Suite 300 Naples, Florida 34108-2713 Keith W. Rizzardi, Esquire South Florida Water Management District Post Office Box 24680 West Palm Beach, Florida 33416-4680 Kenneth B. Cuyler, Esquire Goodlette, Coleman & Johnson, P.A. 4001 Tamiami Trail North, Suite 300 Naples, Florida 34103-3556

Florida Laws (3) 120.569120.577.02
# 10