KIMBERLY J. MUELLER, District Judge.
This matter is before the court on the parties' cross motions for summary judgment. (ECF 77, 83, 84, 87.) Plaintiffs assert BLM's renewal of grazing permits in Eastern California violates the Federal Land Policy and Management Act and the National Environmental Policy Act. The court held hearing on the motions on March 14, 2012. Natalie Havlina appeared for plaintiffs, J. Earlene Gordon appeared for defendant Bureau of Land Management ("BLM"), Brandon Jensen appeared for defendant-intervenor Flying M Ranch ("Flying M"), and Suellen Fulstone appeared for defendant-intervenor R.N. Fulstone Company ("Fulstone") (collectively, "defendant-intervenors"). Having reviewed the parties' briefs and considered their arguments, and reviewed the substantial administrative record in this case,
BLM has authority under the Federal Land Policy and Management Act ("FLPMA"), 43 U.S.C. § 1701, et seq., to issue livestock grazing permits for federal lands. See 43 C.F.R. § 4100.0-1, et seq. Grazing permits generally are valid for ten years and may be renewed. Id. §§ 4110.1(b)(1), 4130.2. Under BLM's grazing regulations, grazing is managed "on public lands under the principle of multiple use and sustained yield, and in accordance with applicable land use plans." 43 C.F.R. § 4100.0-8. Grazing permits are required to have "terms and conditions determined by the authorized officer to be appropriate to achieve management and resource condition objectives for the public lands and other lands administered by the [BLM]...." Id. § 4130.3. Such terms and conditions include "the kind and number of livestock, the period(s) of use, the allotment(s) to be used, and the amount of use, in animal unit months, for every permit or lease." Id. § 4130.3-1(a).
Three sets of standards, established by BLM in accordance with the FLPMA, are relevant to this action. The broadest standards are the "Central California Standards and Guidelines for Livestock Grazing" ("Central California Standards" or "Rangeland Health Standards"), which contain the management standards and guidelines for the entire Central California geographical area. (Doc. 186: AR
Second, the 1993 Bishop Resource Management Plan ("Bishop RMP") applies to a smaller geographic area. (See Doc. 233: AR 8873.) The Bishop RMP is administered by the Bishop Field Office, which manages 750,000 acres of land in Eastern California's Inyo and Mono counties. (Doc. 233: AR 8881, 8971-8973; Doc. 49: AR 1269.) A total 606,000 acres of this land, divided into 58 allotments, are open to grazing. (See Doc. 49: AR 1269.) The Bishop RMP defines mandatory conditions for grazing on these allotments. (Doc. 233: AR 8890-8902, AR 8967-8977.)
The most specific standards relevant to this case are the challenged grazing permits themselves, which were issued by the Bishop Field Office in 2010. (Doc. 9; Doc. 13.) The Bishop Field Office's 58 grazing allotments are grouped into nine management areas. The challenged grazing permits relate to the Bodie Hills Management Area ("Bodie Hills"), which encompasses 121,150 acres of public lands located north of Mono Lake. (Doc. 233: AR 8910.) Plaintiffs challenge BLM's renewal of grazing permits on four specific allotments within the Bodie Hills Management area: the Bodie Mountain, Mono Sand Flat, Potato Peak and Aurora Canyon allotments (collectively, "Bodie Hills allotments"). (See Compl., ECF 1.) Defendant-intervenor Fulstone is the permit-holder for the Potato Peak and Aurora Canyon allotments, and defendant-intervenor Flying M holds permits for the Bodie Mountain, and
Before BLM renewed the permits for the Bodie Hills allotments, in September 2008, BLM issued an environmental assessment ("EA") analyzing the anticipated environmental impacts of renewal. (See Doc. 49: AR 1238.) Prior to issuing the final EA, BLM published a draft version for public comment. Plaintiff Western Watersheds suggested changes to the draft EA, which BLM considered and addressed in the final EA. (Doc. 53: AR 1374; Doc. 49: AR 1238.)
BLM has designated two of the species known to inhabit the Bodie Hills allotments as "sensitive species": the greater sage grouse (centrocercus urophasianus) and the pygmy rabbit (brachylagus idahoensis). (Doc. 49: AR 1323-1330.) The Bishop RMP contains provisions to protect these sensitive species. (Doc. 233: AR 8897.) Among these prescriptions are required yearlong and seasonal protections of these animals' habitats.
In 2003, several parties, including plaintiff Western Watersheds, petitioned the U.S. Fish and Wildlife Service to list the pygmy rabbit as endangered or threatened under the Endangered Species Act. (Doc. 3: AR 6.) In 2005, the U.S. Fish and Wildlife Service ("FWS") published a 90-day finding in the Federal Register, which stated that listing was not warranted. (Id.) The federal court for the District of Idaho vacated and remanded the finding, ordering FWS to issue a new finding on or before December 26, 2007. W. Watersheds Project v. Norton, CV 06-00127SEJL, 2007 WL 2827375 (D.Idaho Sept. 26, 2007). FWS issued the new 90-day finding on January 8, 2008, stating "that the petition presented substantial information indicating that the petitioned action may be warranted" and initiating a 60-day public comment period. (Doc. 3: AR 6.) On September 30, 2010, the FWS issued a proposed finding that listing was not warranted. (Id.)
Plaintiffs filed their complaint challenging BLM's renewal of the grazing permits on October 26, 2010. Plaintiffs' two claims allege BLM's actions violated the 1) FLPMA and 2) the National Environmental Policy Act ("NEPA"), 42 U.S.C. § 4321, et seq.
Defendant-intervenors Flying M and Fulstone contend this court cannot entertain plaintiffs' FLPMA claim because plaintiffs did not raise their FLPMA arguments during the administrative process. Flying M and defendant BLM argue this court lacks jurisdiction to hear any claims brought by plaintiffs that were not raised during the administrative process. (ECF 83-1 at 12-13; ECF 84-1 at 17-18.) Fulstone similarly argues plaintiffs did not raise the issue of the contested grazing decisions violating the Bishop RMP at any time during the administrative process, but asserts instead that this lapse means plaintiffs' FLPMA claim fails as a matter of law. (ECF 87-1 at 21-22.) The court construes defendant-intervenors' arguments as raising issue exhaustion only. If defendant-intervenors also are arguing exhaustion of administrative remedies, the
Plaintiffs are two regional not-for-profit conservation organizations dedicated to protecting the Western United States' natural resources. (Compl.¶¶ 11-12.) Plaintiffs argue that defendant-intervenors confuse exhaustion of administrative remedies with issue exhaustion, that the FLPMA does not require exhaustion of administrative remedies, and that issue exhaustion is not applicable to their FLPMA claim. (ECF 90 at 18-22.)
Defendant-intervenors cite Vermont Yankee Nuclear Power Corp. v. Natural Resources Defense Council, Inc., 435 U.S. 519, 553, 98 S.Ct. 1197, 55 L.Ed.2d 460 (1978), and related cases to contend plaintiffs are barred from raising claims before this court that were not raised in the administrative process. (See, e.g., ECF 83-1 at 12; ECF 84-1 at 24; ECF 87-1 at 22.) Under Vermont Yankee and its progeny, parties "challenging an agency's compliance with NEPA must structure their participation so that it ... alerts the agency to the [parties'] position and contentions, in order to allow the agency to give the issue meaningful consideration." Dept. of Transp. v. Pub. Citizen, 541 U.S. 752, 764, 124 S.Ct. 2204, 159 L.Ed.2d 60 (2004) (internal quotations and citation omitted). Plaintiffs argue this line of cases is distinguishable on two grounds. First, these cases' exhaustion holdings are applicable only to NEPA, and in the instant case defendant-intervenors' exhaustion arguments relate only to the FLPMA. (ECF 90 at 20-21.) Second, the Ninth Circuit has refused to apply the Vermont Yankee doctrine to other statutes. (Id. at 20 (citing Nw. Envir. Def. Ctr. v. Bonneville Power Admin., 117 F.3d 1520, 1535 (9th Cir.1997)) ("NEDC").) In short, plaintiffs contend defendant-intervenors do not cite any legal authority requiring plaintiffs to exhaust their FLPMA claims prior to seeking judicial review. (Id. at 21.)
While specific guidance on issue exhaustion has been provided for certain statutes like NEPA, see, e.g. Pub. Citizen., 541 U.S. at 764-65, 124 S.Ct. 2204, no bright line standard for FLPMA issue exhaustion exists in the Ninth Circuit. See Or. Natural Desert Ass'n v. McDaniel, 751 F.Supp.2d 1151, 1159 (D.Or.2011) (surveying issue exhaustion cases in this Circuit and holding plaintiffs satisfied FLPMA issue exhaustion requirement). As a general rule, courts in this Circuit will consider only those issues that were "presented before an administrative proceeding at the appropriate time." Nat'l Parks & Conservation Ass'n v. BLM, 606 F.3d 1058, 1065 (9th Cir.2010) (quoting Marathon Oil Co. v. United States, 807 F.2d 759, 767-68 (9th Cir.1986)) (internal quotations omitted). However, this general exhaustion requirement should be interpreted "broadly": it is fulfilled if plaintiffs' appeal "provided sufficient notice to the [agency] to afford it the opportunity to rectify the violations that the plaintiffs alleged." Id. (quoting Native Ecosystems v. Dombeck, 304 F.3d 886, 899 (9th Cir.2002)) (internal quotations omitted). Plaintiffs are not required to raise an issue in precise legal terms. Id. Thus, even "general objection[s]" to an agency action under the FLPMA can suffice if the objections, taken as a whole, provide the agency sufficient notice so that the agency can resolve the claim. McDaniel, 751 F.Supp.2d at 1163-64 (citing Idaho Sporting Cong., Inc. v. Rittenhouse, 305 F.3d 957, 965-66 (9th Cir.2002) and Native Ecosystems Council, 304 F.3d at 899). However,
Plaintiff Western Watersheds Project ("WWP") raised objections to BLM's contested July 27, 2009 grazing decisions at several administrative stages. On July 23, 2008, WWP objected to the EA for livestock grazing on the Bodie Hills allotments. (Doc. 53: AR 1374-1390.) In its objection letter, WWP repeatedly referenced FLMPA requirements and discussed its concern for the welfare of the sage grouse and the pygmy rabbit in light of the impacts that livestock grazing on the allotments would have on these two species, impacts such as trampling and loss of vegetative cover. (Doc. 53: AR 1377-1380, 1383-1384.) WWP also protested the proposed grazing decisions on October 17, 2008, stating that the revised EA "acknowledg[es] that livestock grazing impacts sage grouse, pygmy rabbit, and the American pika" but "failed to fully analyze the site-specific impacts of the proposed action on these species or their habitat...." (Doc. 42: AR 1178.) Finally, in its August 28, 2009 appeal of the final grazing decisions, WWP reiterated the above concerns, referenced the fact that the governing land use plan is the Bishop RMP, and included language from the EA, which stated the Bishop RMP controls the height requirement for riparian vegetation. (Doc. 31: AR 702, 712.)
Defendant-intervenors correctly note these objections do not contain the specific arguments plaintiffs assert before this court. Flying M takes the position that WWP's general comments to the agency about alleged impacts of grazing on wildlife habitat are too attenuated from WWP's FLPMA arguments in this action, that BLM is not providing yearlong and seasonal protections to sage grouse and pygmy rabbit habitat as required specifically by the Bishop RMP. (ECF 83-1 at 13-14.) At hearing, counsel for Fulstone similarly argued that WWP never claimed in its arguments at the administrative level that BLM violated the FLPMA specifically by infringing the Bishop RMP's seasonal and yearlong protection requirements. The question this court must resolve is whether WWP's objections are too general to have provided BLM sufficient notice to resolve the more specific claims now before this court.
In McDaniel, the plaintiff argued a BLM decision to open to motorized travel certain routes in a Wilderness Study Area ("WSA") that had fallen into obscurity violated the FLPMA's non-impairment requirement. 751 F.Supp.2d at 1163-64. The defendant argued the plaintiff had failed to exhaust the FLPMA non-impairment issue because "it only complained about the designation of public-access `Obscure Routes' within the WSAs" in an appeal of the BLM's decision. Id. The plaintiff had not mentioned other types of routes, such as permittee-only routes, and had not specified which part of the FLPMA the BLM's decision violated. See id. at 1164. While the court characterized plaintiff's statements as a "general objection" to the challenged BLM action, the court held that "such imprecise formulations can satisfy the issue exhaustion requirement" because plaintiff's administrative appeal, "`taken as a whole, provided sufficient notice' to the IBLA of [plaintiff's] objection to the [] designation of new routes within the WSAs." Id. (quoting Native Ecosystems Council, 304 F.3d at 899) (original emphasis).
In Hankins, the court affirmed in part and reversed in part the district court's holdings on issue exhaustion. 456 F.3d at 967. The plaintiff challenged BLM's approval
Here, the court concludes WWP exhausted its FLPMA claims.
At the same time, it is undisputed that plaintiff Wild Earth Guardians ("WEG") did not participate in the administrative process. The court therefore addresses WEG's ability to persist as a party in this action separately below.
Plaintiffs assert that because plaintiff WWP has standing, it is unnecessary to consider whether plaintiff WEG has standing. (ECF 90 at 44 n. 15 (citing Slockish v. U.S. Fed. Highway Admin., 682 F.Supp.2d 1178, 1186 (D.Or.2010) (citing Nat'l Ass'n of Optometrists & Opticians LensCrafters, Inc. v. Brown, 567 F.3d 521, 523 (9th Cir.2009))).) At hearing, defendant-intervenors contested this assertion, arguing that permitting such piggyback standing would allow unfair leveraging of attorney's fees provisions and the right to appeal.
Authorities supporting each side's positions exist. Slockish and Brown hold that as a general matter a court in an injunctive relief case need not address
Because the parties do not dispute that plaintiff WWP has standing, the court finds it need not reach whether plaintiff WEG has standing. Defendant-intervenors did not separately move to dismiss plaintiff WEG for lack of standing, as did the defendants in Somos America, and defendant-intervenors' concerns about attorney's fees and rights to appeal expressed at hearing are unfounded. Because both plaintiffs have retained the same counsel and assert identical claims, there is no reason to fear additional attorney's fees would be awarded should plaintiffs prevail. Planned Parenthood of Idaho, Inc. v. Wasden, 376 F.3d 908, 918 (9th Cir.2004). While WEG could seek to appeal this court's order, if it did so independently of plaintiff WWP then WEG's independent standing would be considered at that juncture. Cf. Leonard v. Clark, 12 F.3d 885, 888 (9th Cir.1993) (finding that the district court's determination that one organizational plaintiff had standing normally would end the standing inquiry, but because the appellate court determined on appeal that the organizational plaintiff had waived its claims, the appellate court considered the standing of the other individual plaintiffs).
Finally, the court denies BLM's motion to strike WWP's extra-record declarations, which WWP claims are submitted to supplement the record on standing. Courts may consider such declarations "not in order to supplement the administrative record on the merits, but rather to determine whether petitioners can satisfy a prerequisite to this court's jurisdiction." Bonneville Power Admin., 117 F.3d at 1528; see also Natural Res. Def. Council, Inc. v. U.S. Forest Serv., 634 F.Supp.2d 1045, 1053 (E.D.Cal.2007) (denying motion to strike declarations and disavowing reliance on the declarations except as they were relevant to standing); Karuk Tribe of Cal. v. U.S. Forest Serv., 379 F.Supp.2d 1071, 1088 (N.D.Cal.2005), rev'd on other grounds, 681 F.3d 1006 (9th Cir.2012) (holding extra-record declaration permissible to establish standing, even though neither defendants nor intervenors contested standing).
The court reviews final agency actions under the Administrative Procedure Act ("APA"), 5 U.S.C. § 701, et seq. The court does not determine whether there are disputed issues of material fact as it would in a typical summary judgment proceeding; its review is based on the administrative record. 5 U.S.C. § 706(2)(F); Nw. Motorcycle Ass'n v. U.S. Dept. of Agriculture, 18 F.3d 1468, 1472 (9th Cir.1994); see also South Yuba River Citizens League v. Nat'l Marine Fisheries Serv., 723 F.Supp.2d 1247, 1256 (E.D.Cal. 2010) (usual summary judgment standards do not apply). The court must consider whether the agency's actions, findings and
Lands Council v. McNair, 629 F.3d 1070, 1074 (9th Cir.2010) (internal quotations and citation omitted). "In making this inquiry, [the court asks] whether the agency considered the relevant factors and articulated a rational connection between the facts found and the choice made." Natural Res. Def. Council v. U.S. Dep't of the Interior, 113 F.3d 1121, 1124 (9th Cir.1997) (quotations and citation omitted).
NEPA requires agencies to take a "hard look at the environmental consequences" of their proposed actions by analyzing their environmental impacts and considering potential alternatives. Robertson v. Methow Valley Citizens Council, 490 U.S. 332, 351, 109 S.Ct. 1835, 104 L.Ed.2d 351 (1989) (internal quotations and citations omitted); Ctr. for Biological Diversity v. Salazar, 695 F.3d 893, 916-17 (9th Cir.2012); League of Wilderness Defenders-Blue Mountains Biodiversity Project v. U.S. Forest Serv., 689 F.3d 1060, 1075 (9th Cir.2012). NEPA does not require the agencies' decision making process to lead to a particular outcome; it requires agencies to conform to a particular procedure. Or. Natural Desert Ass'n v. Bureau of Land Mgmt., 625 F.3d 1092, 1099 (9th Cir.2010). Rather than reviewing whether the agency reached the correct decision, a court "must consider whether the decision was based on a consideration of the relevant factors and whether there has been a clear error of judgment." Westlands Water Dist. v. U.S. Dept. of Interior, 376 F.3d 853, 865 (9th Cir.2004) (quoting Marsh, 490 U.S. at 378, 109 S.Ct. 1851).
NEPA requires federal agencies, such as BLM, to prepare an Environmental Impact Statement ("EIS") for all "major Federal actions significantly affecting the quality of the human environment." 42 U.S.C. § 4332. If the action will not significantly affect the quality of the human environment, the agency may instead issue a Finding of No Significant Impact ("FONSI") after conducting an Environmental Assessment ("EA") of the project. 40 C.F.R. §§ 1501.4, 1508.13. An EA is a "concise public document" that briefly "provide[s] sufficient evidence and analysis for determining whether to prepare an EIS or a finding of no significant impact." 40 C.F.R. § 1508.9. Although NEPA regulations require agencies to "[m]ake diligent efforts to involve the public in preparing and implementing their NEPA procedures," 40 C.F.R. § 1506.6, there is no requirement that in every case, a draft EA be circulated to the public before a final EA is issued. Bering Strait Citizens for Responsible Res. Dev. v. U.S. Army Corps of Eng'rs, 524 F.3d 938, 952 (9th Cir.2008). However, a draft EA is one way in which an agency can provide the public with environmental information. Id. at 953. "If an agency decides not to prepare an EIS, it
Plaintiffs allege that the BLM's Draft EA prepared in July 2008 for the Bodie Hills allotments grazing decisions violated NEPA in several ways. They claim that 1) BLM did not analyze a sufficient range of alternatives to the proposed action; 2) BLM did not take a hard look at the impacts of grazing on the pygmy rabbit or sage grouse; and 3) BLM should have conducted supplementary analysis after the EA was issued. The court considers each of these claims in turn.
"[A]n agency's obligation to consider alternatives under an EA is a lesser one than under an EIS...." Envtl. Prot. Info. Ctr. v. U.S. Forest Serv., 451 F.3d 1005, 1016 (9th Cir.2006) (citing Native Ecosystems Council v. U.S. Forest Serv., 428 F.3d 1233, 1246 (9th Cir.2005)). "[W]ith an EA, an agency only is required to include a brief discussion of reasonable alternatives. See 40 C.F.R. § 1508.9(b)." Ctr. for Biological Diversity, 695 F.3d at 915 (citation and quotations omitted). NEPA requires BLM to "consider or properly reject proposed alternatives." N. Alaska Envtl. Ctr. v. Kempthorne, 457 F.3d 969, 979 (9th Cir.2006); Envtl. Prot. Info. Ctr., 451 F.3d at 1016. In rejecting any alternatives, the agency must only include "brief discussions of the need for the proposal, of alternatives required by [42 U.S.C. § 4332(2)(E) ], of the environmental impacts of the proposed action and alternatives, and a listing of agencies and persons consulted." Native Ecosystems Council, 428 F.3d at 1246. "So long as `all reasonable alternatives' have been considered and an appropriate explanation is provided as to why an alternative was eliminated, the regulatory requirement is satisfied." Id. at 1246. An analysis of the reasonableness of the agency's range of alternatives begins with the EA's stated purpose. Id.
Plaintiffs allege that BLM violated NEPA because the Final EA did not consider an alternative that would require grazing to continue at a reduced stocking rate. (ECF 77-1 at 19.) BLM asserts that the number of alternatives it considered was sufficient and that plaintiffs do not explain how the alternatives plaintiffs proposed would meet the requirements of the Bishop RMP. (ECF 84-1 at 27-28.)
The Draft EA analyzed three alternatives. Alternative One, the Proposed Action, would "authorize grazing for 10-years on the Bodie Mountain, Mono Sand Flat, Potato Peak, and Aurora Canyon allotments with applicable terms and conditions and other provisions...." (Doc. 56: AR 1405.) Alternative Two, the No Action Alternative, would "issu[e] new 10-year permits with the same terms and conditions as under the existing authorizations." (Doc. 56: AR 1410.) Alternative Three, the No Grazing Alternative, "would cancel the permit for the Bodie Mountain and Mono Sand Flat allotments, and the permit for the Potato Peak and Aurora Canyon allotments. As a result, grazing would not be authorized on these allotments." (Doc. 56: AR 1412.) After the Draft EA was published, plaintiff WWP submitted comments to BLM recommending that BLM "analyze an alternative based on reduced stocking rates." (Doc. 53: AR 1376.) BLM issued its Final EA on September 30, 2008. (Doc. 49.)
An agency's refusal to consider proposed alternatives does not mean that an alternatives analysis is deficient, as long as the agency provides an explanation for why the proposed alternative was not considered in depth. See Earth Island Inst. v. U.S. Forest Serv., 697 F.3d 1010, 1022-23 (9th Cir.2012) (agency's alternatives analysis was not arbitrary and capricious because it explained why the alternative it analyzed was more suitable to achieve the goal of the action than plaintiff's proposed alternative); Ctr. for Biological Diversity, 695 F.3d at 916 (approving analysis of only two alternatives where agency explained why it did not consider plaintiff's proposed alternative). In Native Ecosystems Council, the court rejected the plaintiffs' challenge to the agency's alternatives analysis because neither of the alternatives plaintiffs suggested would have fit the purpose and need of the project. 428 F.3d at 1247-48.
Plaintiffs argue that BLM's explanation in the Final EA for refusing to consider in depth WWP's proposed stocking rate reduction alternative shows that the alternatives analysis is arbitrary and capricious and can be distinguished from alternatives analyses that have been found acceptable by the Ninth Circuit. In rejecting plaintiffs' suggestion, BLM explained in the Final EA that:
(Doc. 49: AR 1264-1265.) Plaintiffs argue that BLM's reasons for rejecting plaintiffs' alternative are inaccurate. Specifically, plaintiffs contend their proposed alternative was consistent with the Bishop RMP and that the record reveals three of the allotments did not meet Rangeland Health Standards. (ECF 77-1 at 20.)
As indicated in the Final EA, rangeland health assessments were conducted for each of the allotments in either 2001 or 2003, as required under the Rangeland Health Standards. (Doc. 49: AR 1254.) Six streams located in the Bodie Mountain allotment, two streams on the Aurora Canyon allotment, and one stream on the Potato Peak allotment were designated as "functioning at risk." (Doc. 147: AR 4614; Doc. 150: AR 4629; Doc. 151: AR 4634.) Nonetheless, BLM rated all the allotments as conforming to the Rangeland Health Standards. (Doc. 147: AR 4615 (Potato Peak); Doc. 150: AR 4630 (Bodie Mountain); Doc. 151: AR 4635 (Aurora Canyon).)
Additionally, WWP points to an excerpt of the Final EA stating that "[l]ivestock grazing remains a factor influencing many
On this record, BLM did not act arbitrarily and capriciously in determining it was unnecessary to consider in depth plaintiffs' proposed alternative. As indicated by the assessments of the allotments completed by BLM's own personnel, the allotments were rated as meeting the Rangeland Health Standards overall and were continuing to improve. BLM met its obligation to provide a reasonable explanation in the Final EA for choosing not to examine plaintiff's suggestion in depth. See Earth Island Inst., 697 F.3d at 1022-23. Because this reason is sufficient to explain why plaintiff's explanation was not considered in depth, the court need not evaluate BLM's contention that plaintiffs' proposed alternative was not consistent with the Bishop RMP.
Plaintiffs next argue that BLM did not take the required hard look in the Final EA and FONSI because it did not consider all the adverse impacts that the Bodie Hills grazing decisions would have on the pygmy rabbit or sage grouse. (ECF 77-1 at 22.)
Plaintiffs advance several criticisms of BLM's analysis of impacts on sage grouse in the Final EA. Plaintiffs argue that the EA inaccurately described the existing state of sage grouse habitat and omitted potential adverse impacts of the grazing decisions on sage grouse, including the possibility of West Nile Virus.
The Final EA summarizes the current status of sage grouse in the allotments and analyzes the anticipated effect on the sage grouse for each of the three alternatives. (Doc. 49: AR 1323-1329.) Plaintiffs argue that, in this section of the Final EA, BLM did not take a hard look at the existing sage grouse habitat or the anticipated impacts of the proposed action on sage grouse. Regarding the preexisting state of sage grouse habitat, plaintiffs assert the Final EA provides that habitat conditions have improved since the 1990s without referencing any supporting studies. (ECF 90 at 27 (citing Doc. 49: AR 1324).) Moreover, plaintiffs contend, BLM's reliance in the Final EA on results of telemetry studies from between 1999 and 2003 to assess the impact of grazing on sage grouse habitat is improper. (ECF 90 at 27-28.) Plaintiffs refer to the 2004 Greater Sage-Grouse Conservation Plan for the Bi-State Plan Area of Nevada and Eastern California ("Bi-State Plan"), written by the Governor of Nevada's task force for sage-grouse conservation. (See Doc. 143: AR 4385.) Plaintiffs assert the Bi-State Plan authors concluded that additional studies were necessary. But instead of explaining whether additional studies were ever conducted, the Final EA only stated that grazing was not a "high priority risk to sage-grouse." (Doc. 49: AR 1325.)
Plaintiffs do not demonstrate that BLM failed to take a hard look at the preexisting state of sage grouse habitat. Courts have held that agencies have neglected to take a hard look at environmental impacts when the agencies have insufficiently considered scientific reports relevant to those impacts. But BLM's
As in Hapner, the Final EA fairly discusses the Bi-State Plan's conclusions about the impact of grazing on sage grouse. (See Doc. 49: AR 1325-1329.) The Bi-State Plan stated that "[p]ermitted livestock grazing is primarily a habitat quality risk in the Bodie PMU." (Doc. 143: AR 4468.) The Bi-State Plan noted further that there was little direct scientific evidence connecting grazing to sage grouse population levels, but that there was some evidence that grazing damages sage grouse habitat, and that additional studies regarding the influence of grazing on habitat were needed. (Id.)
Furthermore, plaintiffs take the Bi-State Plan's recommendation for additional research out of context. In Center for Biological Diversity v. U.S. Forest Service, commentators had criticized the agency's scientific conclusions in the draft EIS but the agency did not respond to those comments in the Final EIS. 349 F.3d 1157, 1165 (9th Cir.2003). The court held that this violated NEPA regulations requiring responses to valid scientific criticisms to be in the Final EIS. Id. at 1167; see also W. Watersheds Project v. Kraayenbrink, 632 F.3d 472, 489-90 (9th Cir.2011). Here, however, the Bi-State Plan's recommendation for additional research was a general comment about the lack of studies on this subject, rather than a direct response to BLM's failure to consider such additional research in the Bodie Hills grazing decision. Plaintiffs do not direct the court to any part of the administrative record showing that scientists called for more research to support the Bodie Hills grazing decision.
Plaintiffs also argue that BLM did not fully consider how grazing conditions will affect sage grouse habitat. (ECF 77-1 at 22.) Specifically, plaintiffs contend that BLM provided no scientific support for its assertion in the EA that limiting livestock utilization to forty percent will meet the sage grouse's habitat needs. (ECF 90 at 29.) BLM responds that there was adequate analysis of the environmental consequences of grazing on sage grouse based on monitoring data, demonstrating that the proposed action would not have significant
Under NEPA, agencies must disclose both positive and negative anticipated impacts of a proposed action. W. Watersheds Project v. Bureau of Land Mgmt., 552 F.Supp.2d 1113, 1129 (D.Nev. 2008). NEPA requires agencies to ensure professional and scientific integrity, by setting forth the methodologies used and making "explicit reference by footnote to the scientific and other sources relied upon for conclusions in the statement." Earth Island Inst. v. U.S. Forest Serv., 442 F.3d 1147, 1160 (9th Cir.2006), abrogated on other grounds by Winter v. Natural Res. Def. Council, Inc., 555 U.S. 7, 129 S.Ct. 365, 172 L.Ed.2d 249 (2008) (citing 40 C.F.R. § 1502.24). Although NEPA regulations only impose this requirement on an EIS, defendant-intervenors do not dispute that it applies to the Final EA here. See Earth Island Inst. v. U.S. Forest Serv., 697 F.3d 1010, 1019 (9th Cir.2012) (where defendants did not dispute this requirement applied to the EA, court considered whether it had been met).
The Final EA states that "[s]age-grouse nesting habitat on these allotments would be maintained or improved from both the 40% utilization limit on perennial grass species and the 20% utilization limit on bitterbrush." (Doc. 49: AR 1326.) The Final EA acknowledges the risk posed to nests by livestock, but asserts that seasonal restrictions on grazing would limit these impacts. (Id.) Plaintiffs have not identified any potential negative impacts on sage grouse habitat that were not addressed in the Final EA.
However, the Final EA's analysis of the impacts on sage grouse is defective because it does not comply with the requirement to reference scientific studies. While there are several references to scientific documents at the end of the section of the Final EA that discuss wildlife, the analysis of impacts on sage grouse does not specify which references it relies on to make conclusions about the impact of the guidelines on sage grouse nesting areas. Cf. Earth Island Inst. v. U.S. Forest Serv., 351 F.3d 1291, 1301 (9th Cir.2003) (Forest Service was not arbitrary and capricious when it referred to scientific literature and data it used to conclude that removing large trees would reduce fire risk); W. Watersheds Project, 552 F.Supp.2d at 1129-30 (most conclusions about the environmental effects of amendment to resource management plan's fire management policy were supported by citations to scientific studies and data, meaning that the EA met minimal requirements under NEPA).
Finally, plaintiffs argue, the Final EA did not consider the potential impact of an outbreak of West Nile Virus, which caused several sage grouse deaths in 2004. (ECF 77-1 at 22-23.) As defendant-intervenors assert, however, plaintiffs show no documentation in the record showing a connection between grazing standards and West Nile Virus. Accordingly, there was no reason for BLM to consider West Nile Virus in the Final EA. See Bicycle Trails Council of Marin v. Babbitt, 82 F.3d 1445, 1446 (9th Cir.1996); Cascadia Wildlands Project v. Conroy, No. CIV. 04-6440-TC, 2006 WL 758541, at *8 (D.Or. Mar. 24, 2006) ("Consideration of effects to the physical environment is required; consideration of remote risks, is not.").
Plaintiffs argue that the Final EA did not sufficiently consider negative impacts
As evidence that BLM ignored potential adverse effects, plaintiffs point to an excerpt from a 2005 finding by the U.S. Fish and Wildlife Service ("FWS") on a petition to list the pygmy rabbit as threatened or endangered. (ECF 77-1.) The FWS finding reviewed numerous scientific articles and acknowledged that grazing can negatively impact pygmy rabbit habitat by damaging plants and trampling burrows or rabbits themselves. (Doc. 135: AR 3584.) The FWS concluded that the petitioners it heard from had not shown that grazing posed a threat to the pygmy rabbit because there was no substantial evidence of a significant overlap between pygmy rabbit habitat and grazing areas. (Id.) Plaintiffs assert that BLM should have considered the threats that petitioners raised in the FWS petition, which are detailed in the 2005 finding.
Although the Final EA's discussion of the anticipated impacts on the pygmy rabbit is extremely short, the court cannot say that BLM ignored any particular potential danger posed to the pygmy rabbit. Because the anticipated impacts to vegetation in the allotments were low, it was reasonable for BLM to conclude that the pygmy rabbit would be minimally affected. (See Doc. 49: AR 1297.)
However, plaintiffs are correct that BLM did not include any references to scientific studies about the habitat needs of pygmy rabbits. (See Doc. 49: AR 1329-1330.) BLM argues that a later 2010 FWS finding, which concluded that grazing does not pose a significant risk to the pygmy rabbit, supports BLM's conclusion that the pygmy rabbit will not be adversely affected. But in the Final EA, BLM did not reference the analysis in that FWS finding or the scientific studies therein. Moreover, at the time the Final EA was issued, the FWS's 2005 finding had been vacated and the 2010 finding had not yet been completed, meaning that BLM could not reasonably have relied on either FWS finding. Because the Final EA does not include references to scientific studies supporting the analysis of anticipated impacts on the pygmy rabbit, this section of the Final EA is defective.
Plaintiffs next assert that the Final EA is deficient because it did not consider how the grazing decisions would affect the need to list either sage grouse or the pygmy rabbit as endangered or threatened under the ESA, or acknowledge that both species had been petitioned for listing. (ECF 77-1 at 23.) Plaintiffs allege that this omission violates both NEPA and BLM's Special Status Species Policy ("SSSP"). (Id.) The SSSP provides that in "[i]mplementation-level planning," BLM should consider the following: "all site-specific methods and procedures which are needed to bring the species and their habitats to the condition under which the provisions of the ESA are not necessary"; "current listings under special status species categories are no longer necessary"; and "future listings under special status species categories would not be necessary." (Doc. 174: AR 5229-5230.) BLM concedes that it was required to comply with the SSSP during the NEPA review process, but argues it complied
Plaintiffs provide no legal authority in support of their argument that BLM was required to consider the possibility of listing, and the cases the court has reviewed indicate BLM was not obligated to make this specific determination. In Idaho Sporting Congress, Inc. v. Rittenhouse, the court held that the Forest Service's approval of a timber sale was arbitrary and capricious under NEPA, where the Forest Service predicted that the sale would harm the habitat of several indicator species that lived in the vicinity of the sale. 305 F.3d 957, 974-75 (9th Cir.2002). Contrary to the recommendations of the Forest Service's scientists, the EIS did not analyze how the species' habitats would be affected on a larger scale, meaning that the Forest Service did not meet its obligation to consider the cumulative impacts of its actions under 40 C.F.R. § 1508.7. Id. Similarly, in Western Watersheds Project v. Salazar, BLM's omission of an analysis of the cumulative impacts on sage grouse when it renewed grazing permits in five allotments in Idaho and Nevada was arbitrary and capricious. 843 F.Supp.2d 1105, 1127-28 (D.Idaho 2012). The court held that because of poor sage grouse habitat conditions in the allotments, BLM should have considered the cumulative impacts on sage grouse of grazing in the allotments combined with the impacts of grazing in other allotments managed by the same BLM field offices. Id.
In contrast, plaintiffs here do not assert that BLM neglected to consider cumulative impacts on sage grouse of grazing in the Bodie Hills allotments combined with the impacts of grazing on sage grouse in other areas. Furthermore, plaintiffs do not demonstrate that any adverse impacts of the grazing decision on the population of sage grouse in the Bodie Hills allotments alone would be significant enough to pose a threat to the survival of the species as a whole. Additionally, unlike the allotments in Salazar, BLM determined that the sage grouse habitat in the Bodie Hills allotments is in satisfactory condition. (See Doc. 33: AR 788; Doc. 49: AR 1324) (nest success is high and compares favorably to that reported elsewhere). In sum, the lack of analysis in the Final EA regarding the likelihood the grazing decisions would contribute to the listing of sage grouse or the pygmy rabbit does not violate NEPA or the SSSP.
Even when NEPA review of a particular project is complete, the agency is obligated to conduct additional review when it learns of significant new circumstances or information that affects the proposed action. Marsh v. Or. Natural Res. Council, 490 U.S. 360, 371-72, 109 S.Ct. 1851, 104 L.Ed.2d 377 (1989). But supplementation is necessary only if "there remains `major Federal actio[n]' to occur," as that term is used in 42 U.S.C. § 4332(2)(C). Norton v. S. Utah Wilderness Alliance, 542 U.S. 55, 72, 124 S.Ct. 2373, 159 L.Ed.2d 137 (2004). The NEPA regulation defining "[m]ajor [f]ederal action" includes both "new continuing activities... entirely or partly financed, assisted, conducted, regulated or approved by federal agencies...." 40 C.F.R. § 1508.18.
Plaintiffs argue that BLM's decision not to conduct supplemental NEPA analysis, after the FWS issued its finding in March 2010 stating that listing of the sage grouse was "warranted but precluded," was arbitrary and capricious. (ECF 77-1 at 26.) Plaintiffs assert that BLM refused even to review the information in the 2010 finding. (Id.) BLM responds that it had no obligation to consider whether the March 2010 finding warranted supplemental analysis because WWP did not timely request the
The court agrees that BLM was not required to conduct supplemental NEPA analysis based on the 2010 FWS finding because by the time that information became available, the grazing permits had already been issued. In Cold Mountain v. Garber, the Forest Service granted a permit for the operation of a bison capture facility, after considering the impact that the facility might have on endangered bald eagles and issuing a FONSI. 375 F.3d 884, 888 (9th Cir.2004). Environmental groups challenged the permits, arguing that the Forest Service should have considered significant new information available after the FONSI was issued, specifically, that the permit's protections for bald eagles were being violated. Id. at 895. But because the permit had already been issued, the federal action was complete and there was no ongoing major federal action mandating NEPA review. Id. As in Cold Mountain, BLM here had already issued the grazing permits several months before the new information presented by WWP was available. Accordingly, no major federal action remained and BLM's NEPA obligations in this respect were discharged.
Plaintiffs assert that even though the grazing permits had already been issued, BLM is still obligated to comply with NEPA because grazing in the allotments is a "continuing activity." (ECF 90 at 37.) However, plaintiffs' argument that BLM itself is involved in the grazing activity beyond the initial issuance of permits is unsupported by law. Plaintiffs contend that because BLM regulations require those who use public lands for grazing to possess a permit for each year of grazing, BLM's actions in renewing permits annually constitute continuous federal action. (Id.) But BLM's enforcement of the regulations plaintiffs reference is directed to prohibited acts on public lands, 43 C.F.R. § 4140.1, and is not sufficient to constitute major federal action for the purposes of NEPA. NEPA regulations specifically exclude "bringing judicial or administrative civil or criminal enforcement actions." 40 C.F.R. § 1508.18(a); see also Ctr. for Biological Diversity v. Salazar, No. CV-09-8207-PCT-DGC, 2010 WL 2493988, at *6 (D.Ariz. June 17, 2010) (BLM's monitoring of compliance with mining plan of operations was not major federal action for the purposes of supplemental analysis under NEPA).
In sum, the court finds BLM complied with all but one of its NEPA obligations: BLM did not comply with the requirement to reference scientific studies when it considered the impacts of renewing the grazing permits on the sage grouse and pygmy rabbit.
The FLPMA directs BLM to manage public lands "in accordance with" the applicable land use plan. 43 U.S.C. § 1732(a). This statutory directive prevents BLM from taking actions inconsistent with provisions of a land use plan. Norton, 542 U.S. at 69, 124 S.Ct. 2373. Until the plan is amended, inconsistent actions can be set aside as contrary to law under section 706(2) of the APA. Id. Plaintiffs' second cause of action asserts BLM's recent grazing decisions concerning the Bodie Hills allotments violate those allotments' land use plan, the Bishop Resource Management Plan ("Bishop RMP").
The Bishop RMP contains "resource condition objectives" called "RMP Decisions." (Doc. 233: AR 8895-8896.) These RMP Decisions are "area wide," meaning
Plaintiffs contend BLM's grazing decisions violate the Bishop RMP in three ways, all related to the RMP's yearlong and seasonal protection requirements. The grazing decisions do not provide: 1) seasonal protection within two miles of sage grouse leks and yearlong protection within one-third mile of sage grouse leks; 2) yearlong protection of pygmy rabbit habitat; and 3) seasonal and yearlong protections for sensitive species habitat. (ECF 77-1 at 16-18.) After discussing the language of the RMP's seasonal and yearlong protections, the court addresses each of these three contentions in turn.
The terms "yearlong protection" and "seasonal protection" are central to plaintiffs' second cause of action. The Bishop RMP's glossary defines these terms. Yearlong protection provides in relevant part: "No discretionary actions which would adversely affect target resources would be allowed. Existing uses and casual use would be managed to prevent disturbance which would adversely affect the target resources." (Doc. 233: AR 8987.) Seasonal protection is defined identically but applies only during a specified period rather than year round. (Doc. 233: AR 8985-8986.) For simplicity's sake, the court refers to yearlong and seasonal protections together as "protection requirements." It is undisputed that cattle grazing, at issue in this case, is an "existing use," (ECF 84-1 at 12; ECF 77-1 at 15), and the Bishop RMP refers to related grazing plans as "Valid Existing Management." (Doc. 233: AR 8890.) "[T]arget resources" include the pygmy rabbit and the sage grouse.
The parties do not address the meaning of the RMP language "managed to prevent disturbance which would adversely affect [the pygmy rabbit and sage grouse]." The definitions of the protection requirements distinguish between "discretionary action" on the one hand, defined as "[a]ny action which BLM has authority to either approve or deny," (Doc. 233: AR 8982), and
The court concludes the plain language of the protection requirements does not mandate that BLM eliminate all adverse effects of cattle grazing on the pygmy rabbit and sage grouse.
The Bishop RMP mandates seasonal and yearlong protections. Seasonal protections, which require cattle grazing to be "managed to prevent disturbance which would adversely affect the target resources," are in effect within two miles of active sage grouse leks from May 1 until June 30. (Doc. 233: AR 8985.) As noted above, the Bishop RMP defines "leks" as "[s]age grouse strutting grounds used during the mating season for courtship displays." (Doc. 233: AR 8983.) Similarly, the Bishop RMP requires "Yearlong Protection within 1/3 mile of sage grouse leks." (Doc. 233: AR 8897.) This yearlong protection requirement differs from seasonal protection in two primary ways: it applies all year and only within one-third mile of leks.
Plaintiffs contend the grazing decisions violate the Bishop RMP's seasonal and yearlong protections because the grazing cattle adversely affect sage grouse by: 1) causing the abandonment and trampling of nests; and 2) reducing foliage cover, which increases the potential for predation of hens and chicks and disturbs leks. (ECF 77-1 at 16-17.) While the challenged grazing decisions do not permit any grazing on the Bodie Hills allotments during May, grazing on the Bodie Mountain and Potato Peak allotments may begin on June 1 and grazing on the Aurora Canyon allotment may begin June 15. (Doc. 32: AR 769; Doc. 33: AR 796.) Plaintiffs assert these three allotments contain several sage grouse leks and extensive sage grouse nesting habitat, which the permitted grazing imperils. (ECF 77-1 at 16 (citing Doc. 49: AR 1324-1325).)
Defendant-intervenor Flying M counters that the RMP's prescribed protection of leks does not completely prohibit livestock grazing. (ECF 83-1 at 14.) Moreover, the renewed grazing decisions in fact comply with the seasonal and yearlong protection requirements by implementing lower
Defendant-intervenor Fulstone argues that plaintiffs' assertions are unsupported by the record. (ECF 87-1 at 26.) For example, Fulstone says, plaintiffs cite no authority for their contention that "[a]llowing livestock to graze on these allotments from June 1 to June 30 will adversely affect sage-grouse by disturbing nesting mothers and increasing the abandonment of nests." (Id.) Plaintiffs cite only the Sage Grouse Bi-State Conservation Plan, and out of context. That plan, developed by all stakeholders including wildlife biologists, states that "[a]uthorized seasons of use on most federal grazing allotments within the Bodie PMU do not begin until after June 1 ... [] eliminat[ing] the potential for lek disturbance in the majority of the PMU." (Id. (citing Doc. 143: AR 4469).)
As discussed below, the court finds BLM's grazing decisions do not violate the Bishop RMP's seasonal and yearlong protection requirements. The court first addresses plaintiffs' nest abandonment and trampling argument, and then considers plaintiffs' foliage utilization argument, that the grazing decisions reduce foliage cover causing predation of hens and chicks and disturbance of leks.
In support of their contention that the grazing decisions violate the seasonal and yearlong protections by increasing the abandonment and trampling of nests, plaintiffs cite to a paragraph of the Bi-State Plan, which is often the crux of the debate between the parties on the seasonal and yearlong protections issues. That paragraph reads in relevant part:
BLM's conclusion, that only slight potential for nest destruction or abandonment exists, is supported by the record. Citing the EA, BLM first reasoned in the grazing decisions that allowing grazing in June is consistent with the seasonal protection requirement because "the actual period of potential overlap between livestock use and nesting sage-grouse on the allotments would occur after the peak of the nesting season in the Bodie Hills." (Id. (citing Doc. 33: AR 788).) This assertion is supported by the Bi-State Plan's language upon which plaintiffs rely. (Doc. 143: AR 4469 (the potential for overlap between livestock and nesting sage grouse on the Bodie allotments is limited because grazing is authorized only after the peak nesting season).) Therefore, by permitting grazing on the allotments beginning on June 1 or June 15, which is after the peak nesting season, BLM is managing grazing to prevent adverse effects to sage grouse.
Plaintiffs also take issue with BLM's statement in the EA and in the grazing decisions that telemetry studies have not documented any actual nest destruction or disturbance. (ECF 90 at 13 (citing Doc. 136: AR 3608).) Plaintiffs assert telemetry studies are not designed to document such impacts. (Id.) Neither party defines telemetry for the court or cites evidence about what telemetry studies are capable of documenting. Plaintiffs cite to a 2008 study conducted "during the last 3 weeks of incubation" in Nevada in which 10 percent of sage grouse hens videotaped were flushed from their nests by cows. (Id. (citing Doc. 30: AR 650-651).) However, plaintiffs do not provide any contextual information about this study, such as whether it was conducted after the peak nesting season or whether the hens returned to their nests after being flushed. However, the study does suggest that cows can harm nests and cause nest abandonment. This suggestion is reinforced by the FWS Report, which cites several studies to conclude that grazing cattle do destroy nests and cause nest abandonment. (Doc. 136: AR 3608.) BLM concedes this fact. BLM has simply concluded, consonant with the evidence in the record, that the possibility of nest harm or abandonment is minimized by permitting grazing only after peak nesting season.
BLM's second rationale supporting its conclusion that only a slight potential for nest destruction or abandonment exists is less persuasive. BLM reasons that overall nest success in the Bodie Hills is high and compares favorably to that reported elsewhere in sage grouse range. (See Doc. 33: AR 788; Doc. 49: AR 1324.) This assertion about the relative success of nesting on the allotments at issue is too ambiguous to be given weight. BLM does not provide contextual information, such as whether and when cattle graze in the other parts of the sage grouse range, to clarify the strength of this comparison.
BLM's third rationale is that nesting habitat quality or quantity and nest success are not limiting factors for sage
BLM might not be managing grazing to prevent adverse effects if it permitted an activity that can exacerbate a limiting factor for sage grouse.
Plaintiffs' seasonal protection argument also is meritless because it focuses on sage grouse nests rather than leks. The Bishop RMP's seasonal protection is required only within two miles of active sage grouse leks. (Doc. 233: AR 8897 ("Seasonal Protection within 2 miles of active sage grouse leks from 5/1 to 6/30.").) "Leks" are not coterminous with nesting areas, but are the strutting grounds used during mating for courtship displays. (Doc. 233: AR 8983.) Therefore, the question whether the contested grazing permits violate the Bishop RMP's seasonal protection requirement depends on whether those potential adverse effects occur within two miles of active strutting grounds. In the contested grazing decisions, BLM addressed plaintiffs' merging the concepts of "nests" and "leks," albeit in a different context.
Furthermore, as the court concluded above, BLM has provided the necessary seasonal protections for sage grouse by permitting grazing only after the peak nesting and mating season. Plaintiffs' argument on this point has no merit.
Plaintiffs also contend the BLM's grazing decisions violate the Bishop RMP's seasonal and yearlong protection requirements because cattle will graze on foliage, which, according to the Bi-State Plan, reduces cover and increases the potential for predation of hens and chicks. (ECF 77-1 at 16 (citing Doc. 143: AR 4462).) Plaintiffs cite the 2005 FWS Report, which cites three studies to conclude that "[i]t has been demonstrated that the reduction of grass heights due to livestock grazing of sage-grouse nesting and brood-rearing areas negatively affects nesting success by reducing cover necessary for predator avoidance." (ECF 90 at 12 (citing Doc. 136: AR 3607).) Plaintiffs argue that reduced cover also affects the ability of sage grouse to escape and hide during breeding season. (Id. at 17.) While plaintiffs' citation to the record does not support this assertion (ECF 77-1 at 17 (citing Doc. 142: AR 4072-4075)), the Bi-State Plan does. (Doc. 143: AR 4468 ("While there is little direct scientific evidence that links livestock grazing to sage-grouse population levels, indirect evidence suggests that grazing practices that significantly reduce the height and cover of the herbaceous understory in breeding habitat may negatively affect sage-grouse populations.").) Plaintiffs also assert no deference should be given BLM's determination that the foliage grazing utilization requirements fulfill BLM's protections obligation because BLM did not explain its reasoning. (Id. at 15 (citing Brower v. Evans, 257 F.3d 1058, 1067 (9th Cir.2001)).)
Defendant-intervenor Fulstone argues that the terms and conditions governing the grazing permits incorporate the Bishop RMP's seasonal and yearlong protection utilization requirements, as amended in 2000 by the Standards for Rangeland Health and Guidelines for Livestock Grazing Management ("Rangeland Health Standards"). (ECF 87-1 at 24-26 (citing Doc. 193: AR 5945-5948).) Fulstone also maintains plaintiffs' references to the Bi-State Plan are taken out of context. (Id. at 27.) Fulstone notes the Plan mentions several studies reporting that properly managed and timed grazing can improve sage grouse habitat by increasing forb availability. (Id. (citing Doc. 143: AR 4468).)
Defendant BLM and defendant-intervenor Flying M also assert the grazing decisions here explicitly comport with the requirements of the Bishop RMP and the Rangeland Health Standards. (ECF 83-1 at 14-15; ECF 93 at 10-12.) The permits include mandatory terms and conditions such as livestock number, livestock kind, season of use, and allocated "animal unit months" ("AUMs"),
The court finds the grazing permits' utilization limits of forty-percent on perennial grass species and twenty-percent on bitterbrush are consistent with BLM's mandate to manage grazing to prevent disturbance that would adversely affect the sage grouse and their leks. BLM adequately explained its reasoning for its conclusion that the lower utilization levels would not adversely affect the sage grouse. Citing two specific studies, BLM reasoned in the EA that the forty-percent utilization of native vegetation "has been shown to benefit plant production and resilience" and is designed to help reduce the spread of weeds. (Doc. 49: AR 1296-1297.) BLM Rangeland Health Assessments in 2001 and 2003 concluded the cattle stocking rates were moderate and did not impair the large-scale ecological function of specifically-enumerated plant communities, including perennial grasses. (Doc. 49: AR 1297.)
Further, BLM found grazing impacts such as localized soil disturbance would affect only very small portions of these allotments, less than two acres total on each allotment, where mineral blocks and watering activities occur. (Id.) Even if the court accepted the seven-inch height requirement for perennial grasses contained in the Connelly Guidelines (Doc. 190: AR 5921), there is no evidence in the record indicating what alternative utilization level would maintain this height. Plaintiffs cite a District of Idaho case to support their claim that a seven-inch height requirement demands a maximum thirty-percent utilization standard. Dyer, 2009 WL 484438, at *21 ("[M]onitoring is necessary to ensure that use of herbaceous forage is limited to about 30% of annual production."). Even if this court were to assume the term "herbaceous forage" includes perennial grass, the Dyer case is not persuasive, given that it was decided on a different administrative record and concerned land in a different state utilizing a different RMP. BLM's considered position that rangeland health will be sustained by the forty- and twenty-percent utilization standards, a position based on studies to which plaintiffs do not object, deserves deference from this court. Marsh v. Or. Natural Res. Council, 490 U.S. 360, 377, 109 S.Ct. 1851, 104 L.Ed.2d 377 (1989) (in an APA dispute primarily involving issues of fact, the court "must defer to `the informed discretion of the responsible federal agencies.'").
In the yearlong protection context, plaintiffs additionally contend that the grazing decisions' monitoring requirements explicitly apply only to "key areas," a term that is undefined, and the decisions do not indicate how many of the allotments' leks are located in these "key areas." (ECF 77-1 at 17.) Even in the key areas, monitoring is ineffectual because, plaintiffs argue, BLM will respond to noncompliance only if livestock consume more than seventy-percent of the vegetation for two years in a row. (Id.)
Assuming, without deciding that yearlong protection mandates monitoring,
During the permitting process, BLM explicitly considered plaintiffs' argument that the monitoring regime's seventy-percent utilization threshold to trigger a BLM response is inadequate. (Doc. 32: AR 757-758.) BLM explained:
(Doc. 32: AR 758.) As this explanation clarifies, the seventy-percent trigger exists to ensure the intervenors do not graze a particular area to excess while leaving other areas untouched. Without this trigger, the intervenors could comply with the forty-percent average limit on the allotment as a whole while overgrazing a particular area. Here again, on this record, the court accords BLM deference with respect to its reasoned conclusion that this monitoring regime is sufficient to comply with the allotments' resource objectives. Marsh, 490 U.S. at 377, 109 S.Ct. 1851.
Plaintiffs' cited cases do not direct a different result. For example, this case is distinguishable from Western Watersheds Project v. Bennett, 392 F.Supp.2d 1217 (D.Idaho 2005). There, the governing RMP mandated that any increase in grazing "would not be authorized unless monitoring studies indicate that the basic soil, vegetation, and wildlife resources are being protected and additional forage is available." Id. at 1227-28. The court found BLM did not conduct any monitoring at all before approving increased grazing. Id. Here, there are no similar bright-line facts. Rather, there are potential adverse effects to sage grouse and their leks that may lie within the protected area. Moreover, the threshold mandate in Bennett to monitor also was more clear. Here, by contrast, BLM must manage grazing "to prevent disturbance which would adversely affect" sage grouse and their leks. The Bishop RMP's mandate involves greater discretion than the mandate in Bennett, and therefore Bennett cannot guide the court on the quantum of potential adverse effects sufficient to constitute a FLPMA violation. See Norton, 542 U.S. at 72, 124 S.Ct. 2373 ("[W]e find it unnecessary to consider whether the action envisioned by the statements [in the
Neither does Oregon Natural Resources Council Fund v. Brong, 492 F.3d 1120 (9th Cir.2007) control this case. Brong involved a salvage logging project to remove large standing dead or dying trees, known as "snags," in a thousand acres of protected land in Oregon after a forest fire. Id. at 1123, 1128. The governing management plan's relevant mandate was that "management should focus on retaining snags that are likely to persist until late-successional conditions have developed and the new stand is again producing large snags." Id. at 1128. The court found the project contravened this mandate for several reasons. First, the court found BLM's interpretation of the mandate deserved no deference because its interpretation of the plan's management directive was inconsistent with the plan, which was no "ordinary government land-management strategy." Id. at 1126-27. The plan's contentious history was evidence of its singularity: it was a response to a long and bitter legal battle over the scope of logging in old-growth forests inhabited by the endangered spotted owl. Id. BLM had construed the plan's management directive as "balancing environmental concerns and economic factors equally," but the court found the management directives prioritized environmental concerns. Id. In the instant case, plaintiffs do not argue BLM has misinterpreted the management directive of the Bishop RMP, which is to "[r]esolve issues in a manner that will protect and enhance environmental values while allowing for resource use and development." (Doc. 233: AR 8896.) BLM nowhere asserts as a defense to its grazing decisions that economic and environmental values are on par in the Bodie Hills Management Area. Rather, BLM has acknowledged its responsibility to comply with the seasonal protection requirement and contends it has considered whether permitting grazing in June would adversely affect the sage grouse; it has concluded that little potential for adverse effects exists.
Second, the Brong court found BLM's "some-is-enough" argument in that case, whereby it asserted leaving eight-to-twelve snags per acre on average was sufficient to protect wildlife habitat, was "grossly misleading"; in reality over two-thirds of the affected acreage would be completely stripped of all snags. 492 F.3d at 1129-30. Here, no such clear evidence of grazing causing adverse effects to the sage grouse is before the court.
Plaintiffs also contend that the Bodie Hills grazing decisions violate the Bishop RMP because they do not provide yearlong protection of pygmy rabbit habitat. (ECF 77-1 at 17.) The decisions do not contain any provisions to limit disturbance of the pygmy rabbit habitat or to monitor habitat for any adverse effects from grazing, which could include trampling of burrows, depletion of grasses used for food, and damage to sagebrush that provides food and cover from predators. (Id. at 8, 17.) In their reply, plaintiffs recycle their seasonal protection utilization and nest disturbance and trampling arguments concerning the sage grouse and simply substitute reference to the pygmy rabbit. (See ECF 90 at 11, 14-15.)
Responding in kind, defendant-intervenors largely address plaintiffs' pygmy rabbit arguments together with their sage grouse arguments. (See, e.g., ECF 83-1 at 14.) Intervenor Flying M additionally argues that the reduced utilization limits will result in increased grass density and cover, which will benefit the pygmy rabbit. (Id. at 16-17 (citing the EA, Doc. 49: AR 1327).) Defendant-intervenor Fulstone
The Bishop RMP does not specifically mention the pygmy rabbit. However, its area-wide prescriptions include "Yearlong Protection of endangered, candidate, and sensitive plant and animal habitats." (Doc. 233: AR 8897.) BLM recognizes the pygmy rabbit as a sensitive species. (Doc. 49: AR 1317.) Therefore, yearlong protection requires cattle grazing be "managed to prevent disturbance which would adversely affect" the pygmy rabbit. (Doc. 233: AR 8987.) Unlike the seasonal and yearlong protection requirements the court has already considered, this yearlong protection is not tethered to any spatial requirement.
The court finds the BLM did not violate the Bishop RMP's yearlong protection requirement for the pygmy rabbit in issuing its grazing decisions. BLM considered the impacts of cattle grazing on pygmy rabbit habitat in the EA and concluded the likelihood of adverse effects was minimal. (Doc. 49: AR 1325-1329.) First, BLM found that the reduced utilization standard would improve plant community vigor (Doc. 49: AR 1296-1297 (citing two studies)), thereby improving pygmy rabbit habitat (Doc. 49: AR 1327). Second, BLM concluded the potential for burrow collapse would be minimal "based on existing information." (Id.) BLM further explained in the grazing decisions that "[t]o date, field office biologists have not documented any evidence of such burrow collapse despite extensive field experience working in both currently occupied and potential pygmy rabbit habitats found on the allotments." (Doc. 33: AR 789.) BLM's conclusion that burrow collapse is "rare" is therefore based on "direct field observations, combined with professional and applied knowledge of both pygmy rabbit habitat requirements and allotment specific habitat conditions." (Id.)
Furthermore, evidence in the record supports BLM's conclusion. The 2010 FWS Report determined that livestock grazing is not a significant threat to the pygmy rabbit. (Doc. 3: AR 28.) Grazing at inappropriate levels can degrade the sagebrush habitat, but at reasonable levels it may be beneficial. (Doc. 3: AR 27.) The Report acknowledged that burrow trampling can occur, but stated its authors are "not aware of any studies relating actual site abandonment, increased predation, death, or injury due to livestock grazing or trampling." (Doc. 3: AR 28.) The Report also concluded "there is no indication of a causal relationship between livestock grazing and pygmy rabbit site abandonment or avoidance." (Id.)
Finally, BLM's monitoring regime, described above, is designed to ensure intervenors comply with the utilization requirement. (See Doc. 32: AR 758.) While the absence of any explicit reference to the pygmy rabbit in the EA, the Central California Standards, or the Joint Cooperative Monitoring Plan suggests BLM does not conduct regular monitoring of pygmy rabbit populations specifically, the court declines to read this requirement into the Bishop RMP, which also does not specifically mention the pygmy rabbit.
Plaintiffs finally contend that BLM does not "make any attempt to provide the seasonal and yearlong protections for sensitive species habitat required by the Bishop RMP." (ECF 77-1 at 17-18.) As noted
In their complaint, plaintiffs enumerate a third cause of action, which alleges a violation of the FLPMA and the SSSP. The gravamen of this claim is that the SSSP requires BLM to "ensure that actions authorized, funded or carried out by BLM do not contribute to the need for the species to become listed." (Compl. ¶ 91.) However, plaintiffs did not move for summary judgment on this cause of action: the only mention of the SSSP in plaintiffs' moving papers is in the context of their NEPA claim. (ECF 90 at 26-27.) Intervenor Fulstone argued in its motion for summary judgment that plaintiffs have abandoned their third cause of action, and plaintiffs did not address this argument in their reply. (ECF 87-1 at 29.) Plaintiffs' reply also mentions the SSSP only in the context of NEPA. (ECF 90 at 26-27.) Accordingly, the court considers this claim abandoned and declines to address it. Morales v. City of Delano, 852 F.Supp.2d 1253, 1271 (E.D.Cal.2012) ("Where a defendant moves for summary judgment and the plaintiff does not oppose or raise the claim in opposition, the claim is deemed abandoned.") (citing Jenkins v. County of Riverside, 398 F.3d 1093, 1095 n. 4 (9th Cir.2005)).
IT IS SO ORDERED.