Summary: Case: 14-10615 Document: 00513087412 Page: 1 Date Filed: 06/22/2015 IN THE UNITED STATES COURT OF APPEALS FOR THE FIFTH CIRCUIT United States Court of Appeals Fifth Circuit No. 14-10615 FILED June 22, 2015 Lyle W. Cayce In the Matter of: BERT A. WHEELER, Clerk Debtor - PAL-CON, LIMITED; VALLEY FORGE INSURANCE COMPANY, Appellees v. BERT A. WHEELER, doing business as Anne's Pilot Car Service, Appellant Appeal from the United States District Court for the Northern District of Texas USDC No. 4:13-CV
More
      Case: 14-10615             Document: 00513087412   Page: 1   Date Filed: 06/22/2015




            IN THE UNITED STATES COURT OF APPEALS
                     FOR THE FIFTH CIRCUIT
                                                                              United States Court of Appeals
                                                                                       Fifth Circuit

                                          No. 14-10615                               FILED
                                                                                 June 22, 2015
                                                                                Lyle W. Cayce
In the Matter of: BERT A. WHEELER,                                                   Clerk

                 Debtor

------------------------------

PAL-CON, LIMITED; VALLEY FORGE INSURANCE COMPANY,

                 Appellees

v.

BERT A. WHEELER, doing business as Anne's Pilot Car Service,

                 Appellant




                      Appeal from the United States District Court
                           for the Northern District of Texas
                                USDC No. 4:13-CV-1007


Before REAVLEY, SMITH, and GRAVES, Circuit Judges.
PER CURIAM:*




        *Pursuant to 5TH CIR. R. 47.5, the court has determined that this opinion should not
be published and is not precedent except under the limited circumstances set forth in 5TH
CIR. R. 47.5.4.
    Case: 14-10615      Document: 00513087412        Page: 2    Date Filed: 06/22/2015




      Plaintiff Pal-Con, Limited (“Pal-Con”) 1 specializes in the manufacture,
repair, and service of large regenerators for gas turbine engines, and has no
direct competitors for its regenerator products.           Pal-Con contracted with
Spectra Energy (“Spectra”) to manufacture, deliver, and install a regenerator.
Pal-Con manufactured the regenerator in two halves, the left-side and the
right-side modules.        Pal-Con contracted with Friend’s Express L.L.C.
(“Friend’s”) to ship the regenerator to Spectra. The right-side module was to
be shipped on one truck and the left-side module on another.                   Friend’s
subcontracted with Brantley Transportation (“Brantley”) to transport the two
regenerator modules by truck.         Ohio law required that Brantley obtain a
permit and a pilot car escort to transport the oversized load through the state.
Brantley contracted with Defendant Bert A. Wheeler (“Wheeler”) to pilot the
left-side module shipment through Ohio, and to ensure, given the height of the
module, that the shipment did not strike a highway overpass.
      While Wheeler was leading Brantley’s employee Jacob Maples
(“Maples”) through Ohio, Maples missed the correct exit and began travelling
north on a highway on which he should have been traveling south. Maples
radioed to Wheeler who then met Maples on the north highway on the side of
the road. Instead of exiting the north highway immediately, scouting for a new
route, or consulting with the permit office or state police on a route, Wheeler
continued with Maples on the north highway for twenty miles. At some point,
Wheeler’s height-pole struck an overpass. At that point, Wheeler radioed to
Maples who was about a half-mile behind him to stop. Maples said that he
could not stop in time due to heavy traffic and the weight of the load. Maples



1 In this opinion, we collectively refer to Plaintiffs Pal-Con and Valley Forge Insurance
Company as “Pal-Con”. Plaintiff Valley Forge Insurance Company is Pal-Con’s subrogated
insurer.
                                               2
     Case: 14-10615        Document: 00513087412         Page: 3     Date Filed: 06/22/2015



                                       No. 14-10615
was afraid that if he completely locked the brakes under those circumstances
he would cause an accident. Therefore, Maples, instead, struck the overpass
and irreparably damaged the left-side regenerator module.
       As a consequence of this accident, Pal-Con was forced to build and install
a temporary and then a permanent replacement module for Spectra. Pal-Con
was later able to sell the temporary replacement module to another client
thereby recouping all the costs associated with the building of the temporary
replacement unit.        Pal-Con filed suit against Wheeler, among others, for
negligence under Texas state law. The action was removed to federal court
and proceeded to trial. A jury found that Wheeler was 35 percent responsible
for Pal-Con’s damages, resulting in a judgment against Wheeler.
       Wheeler now appeals this judgment and raises six issues 2 that we have
condensed into three main issues. The first issue is whether the negligence
suit against Wheeler is legally and factually supported under these
circumstances, and in particular, whether the economic loss doctrine bars a
suit in tort. The second issue is whether there is sufficient evidence to support
the damages award. And the final issue is whether the district court erred in
its jury instructions and its overall management of the trial.
                                              I.
       At the close of the trial, Wheeler timely-filed a preserved motion for
judgment as a matter of law and, in the alternative, a motion for a new trial.
The district court denied Wheeler’s motions. Wheeler now challenges the
district court’s denial.



2The six issues raised by Wheeler are as follows: (1) Pal-Con’s claims against Wheeler are
barred by the economic loss doctrine; (2) Wheeler owed no negligence duty to Pal-Con; (3)
Wheeler did not breach any duty owed to Pal-Con; (4) there is insufficient evidence of Pal-
Con’s claimed damages and the district court’s damage award; (5) the district court erred in
not submitting to the jury a proportionate responsibility question; (6) the cumulative error of
the district court resulted in an improper verdict.
                                              3
    Case: 14-10615    Document: 00513087412      Page: 4   Date Filed: 06/22/2015



                                 No. 14-10615
      We review the denial of a motion for judgment as a matter of law de novo.
Heck v. Triche, 
775 F.3d 265
, 272 (5th Cir. 2014). Where, as here, a case has
been tried by a jury, we determine whether there is legally sufficient evidence
to support the jury’s verdict. 
Id. “Although our
review is de novo, we recognize
that our standard of review with respect to a jury verdict is especially
deferential.” 
Id. at 273
(quoting Flowers v. S. Reg’l Physician Servs. Inc., 
247 F.3d 229
, 235 (5th Cir. 2001). “[W]e draw all reasonable inferences and resolve
all credibility determinations in the light most favorable to the nonmoving
party, and will reverse the denial of a motion or renewed motion for judgment
as a matter of law only if the evidence points so strongly and so overwhelmingly
in favor of the nonmoving party that no reasonable jury could return a contrary
verdict.” 
Id. (quoting Foradori
v. Harris, 
523 F.3d 477
, 485 & n.8 (5th Cir.
2008)) (internal quotation marks omitted).
      We will reverse the denial of a motion for a new trial only where a district
court has clearly abused its discretion. Henry v. CorpCar Servs. Houston, Ltd.,
No. 13-20744, 
2015 WL 327650
, at *4 (5th Cir. 2015). “Because our review of
the district court’s denial of a motion for a new trial is more deferential than
our review of a motion for judgment as a matter of law, any such challenge is
subsumed in our analysis of the denial of a motion for judgment as a matter of
law.” 
Id. (quoting Wackman
v. Rubsamen, 
602 F.3d 391
, 399 (5th Cir. 2010))
(internal quotation marks omitted).
The Economic Loss Doctrine
      Wheeler contends that he is entitled to judgment as a matter of law
because the economic loss doctrine bars recovery in tort under the facts of this
case. Specifically, Wheeler argues that the only economic damages suffered by
Pal-Con resulted from harm to the subject matter of a contract (the
regenerator), precluding a remedy in tort. “The economic loss rule generally
precludes recovery in tort for economic losses resulting from a party’s failure
                                        4
    Case: 14-10615   Document: 00513087412     Page: 5   Date Filed: 06/22/2015



                                No. 14-10615
to perform under a contract when the harm consists only of the economic loss
of a contractual expectancy.”    Chapman Custom Homes, Inc. v. Dallas
Plumbing Co., 
445 S.W.3d 716
, 718 (Tex. 2014) (per curiam). “Thus, a party
states a tort claim when the duty allegedly breached is independent of the
contractual undertaking and the harm suffered is not merely the economic loss
of a contractual benefit.” McCaig v. Wells Fargo Bank (Texas), N.A., No. 14-
40114, 
2015 WL 3621863
, at *4 (5th Cir. June 10, 2015) (quoting 
Chapman, 445 S.W.3d at 718
) (internal quotation marks omitted). The economic loss
doctrine does not shield the recovery of tort damages resulting from physical
injury to property in which a non-contracting plaintiff has a proprietary
interest. See LAN/STV v. Martin K. Eby Constr. Co., 
435 S.W.3d 234
, 235,
238 (Tex. 2014); 
Chapman, 445 S.W.3d at 717
.
     Given that Wheeler’s subcontract with Brantley only obligated him to
reasonably pilot the shipment, we hold that Wheeler owed Pal-Con a duty
independent of his subcontract with Brantley to protect the regenerator
module from physical damage. Our conclusion is inescapable in light of the
Texas Supreme Court’s precedent in Chapman. In Chapman, a landowner
contracted with a builder who subcontracted with a negligent plumber. 
Id. at 717–18.
The plumber negligently failed to join the water system to the hot
water heaters which caused water damage to the new house. 
Id. at 718.
The
court found that the landowner was allowed to sue the negligent plumber in
tort because “[h]aving undertaken to install a plumbing system in the house,
the plumber assumed an implied duty not to flood or otherwise damage the . . .
house while performing its contract with the builder.” 
Id. at 718.
Moreover,
the court explicitly rejected the notion that the property damage was “a mere
economic loss arising from the subject matter of the contract itself.”       
Id. (internal quotation
marks and citation omitted).


                                      5
    Case: 14-10615      Document: 00513087412        Page: 6    Date Filed: 06/22/2015



                                    No. 14-10615
      The facts of the instant action are not unlike those in Chapman. Here,
a manufacturer contracted with a shipper, who subcontracted with a trucking
company, who subcontracted with a negligent pilot car service provider for the
safe delivery of the regenerator module. Because the harm suffered by Pal-
Con extended beyond the mere economic loss of a contractual benefit from
Wheeler’s individual contract with Brantley, the economic loss doctrine is not
a bar to Pal-Con’s negligence action against Wheeler. See 
id. Sufficiency of
Evidence in Support of Negligence Verdict
      Wheeler further contends that he is entitled to judgment as a matter of
law because Pal-Con has not proven that Wheeler owed a duty to Pal-Con or
that any such duty was breached. However, under these facts, we predict that
Texas law 3 would recognize a common law duty on the part of Wheeler to pilot
Pal-Con’s shipment with reasonable care.             Texas’s test for identifying a
common-law duty is well established.            “[T]he court will consider several
interrelated factors, including the risk, foreseeability, and likelihood of injury
weighed against the social utility of the actor’s conduct, the magnitude of the
burden of guarding against the injury, and the consequences of placing the
burden on the defendant. Of all these factors, foreseeability of the risk is the
foremost and dominant consideration.”             Greater Houston Transp. Co. v.
Phillips, 
801 S.W.2d 523
, 525 (Tex. 1990). In addition to this test, Texas courts
also consider “(1) whether one party has superior knowledge of the risk; (2)
whether one party had a right to control the actor who caused the harm; (3)
whether societal changes require recognition of new duties; (4) whether the
creation of a new duty would be in conflict with existing statutory law; and (5)
whether there are countervailing concerns that would support or hinder the



3A negligence duty can be assumed by contract or imposed by law. Southwestern Elec. Power
Co. v. Grant, 
73 S.W.3d 211
, 223 (Tex. 2002).
                                           6
     Case: 14-10615        Document: 00513087412           Page: 7      Date Filed: 06/22/2015



                                         No. 14-10615
recognition of a new duty.” J.P. Morgan Chase Bank, N.A. v. Texas Contract
Carpet, Inc., 
302 S.W.3d 515
, 533 (Tex. 2009).
       Applying these factors, we conclude that if a pilot car driver acts
negligently, the risk of damage to the shipment is highly foreseeable.
Foreseeability is particularly clear when, as in this case, state law requires the
shipment to remain on a preapproved route and to be led by a pilot car with a
height sensing device, for the sole purpose of avoiding collisions with overhead
obstructions. The extent of the risk is large because if a shipment that is
traveling on a moving vehicle, at highway speeds, collides with an overpass,
considerable damage is likely. The burden of guarding against the risk is
small—staying on the permitted route, or taking reasonable steps to return to
a permitted route. As between a manufacturer and a pilot car driver, the latter
has superior knowledge about avoiding the risks of transporting an oversized
shipment. Because the foreseeability of the risk is high, the burden of guarding
against the risk is small, and the remaining factors weigh in favor of finding a
duty, Texas courts would likely find that a pilot car driver owes a common law
duty to the owner of the shipment. 4
       Moreover, the evidence supporting the jury’s finding that Wheeler
breached his duty to Pal-Con is substantial. Industry experts testified about



4 Wheeler contends that the recognition of a common law duty would create an end-run
around the Carmack Amendment. “The Carmack Amendment provides a general rule that
motor carriers transporting property are liable to shippers ‘for the actual loss or injury to the
property,’ but allows an exception under which . . . the liability of the carrier for such property
is limited to a value established by written or electronic declaration of the shipper or by
written agreement between the carrier and shipper if that value would be reasonable . . . .”
Tran Enters., LLC v. DHL Express (USA), Inc., 
627 F.3d 1004
, 1010–11 (5th Cir. 2010)
(quoting 49 U.S.C. § 14706(a)(1) and § 14706(c)(1)(A)) (emphasis added) (internal quotation
marks omitted). If Wheeler is a carrier, the Carmack Amendment would preempt Pal-Con’s
state negligence claim. However, because a pilot car does not directly handle the shipment
or exercise significant control over the shipment, we conclude that a pilot car does not
constitute a carrier under the Carmack Amendment. For that reason, Wheeler’s argument
fails.
                                                7
    Case: 14-10615     Document: 00513087412     Page: 8   Date Filed: 06/22/2015



                                  No. 14-10615
the pilot car industry standard of care. These experts averred that when a
shipment deviates from an authorized route, the pilot car driver—working in
tandem with the shipment driver—should take reasonable steps to return to
the route by either contacting the permit office, consulting with the state
police, or scouting for a clear route back. Wheeler even admitted that it is
never safe to proceed off the permitted route. While Wheeler contends that he
could not have prevented Maples from proceeding on the unpermitted route, a
rational jury could have rejected this argument. There is undisputed evidence
that once Maples missed the correct exit, he pulled over to the side of the road
and waited for Wheeler to return. The jury was permitted to infer that Maples
would have followed Wheeler’s lead.
      Thus, the jury’s finding of negligence is legally and factually supported,
and Wheeler is not entitled to judgment as a matter of law.
                                       II.
      Wheeler argues that there was insufficient evidence to support the jury’s
finding of lost profits and the jury award pertaining to the permanent
replacement module. Additionally, Wheeler contends that Pal-Con was not
entitled to recover damages for the temporary replacement module altogether
because that unit was later sold for an overall profit. Wheeler did not raise
any of these challenges in his motion for judgment as a matter of law.
Accordingly, this issue is subject to a plain error analysis. Under plain error
review of a jury verdict, “the question for this court is not whether there was
substantial evidence to support the jury verdict, but whether there was any
evidence to support the jury verdict.” Flowers v. S. Reg’l Physician Servs. Inc.,
247 F.3d 229
, 238 (5th Cir. 2001) (internal quotation marks and citation
omitted).
      Given that Pal-Con never demonstrated that it lost a sale and due to the
fact that Pal-Con has no direct competitors, the evidence of lost profits is thin.
                                        8
    Case: 14-10615     Document: 00513087412     Page: 9   Date Filed: 06/22/2015



                                  No. 14-10615
However, under our lenient standard of review, we cannot conclude that there
was no evidence to support the jury’s lost profits award. Pal-Con’s president
testified that during the time Pal-Con was building the temporary and
permanent replacement modules, he was unable to solicit business because the
factory was operating at full capacity. This evidence was sufficient under plain
error review to support the jury’s award.
      Similarly, on plain error review, there was sufficient evidence to support
the jury’s damages for Pal-Con’s permanent replacement module. Although
Pal-Con claimed more costs in constructing the permanent replacement
module than in building the original, Pal-Con was required to manufacture the
replacement within half the time it took to build the original. Pal-Con provided
detailed evidence to the jury about the material, labor, equipment, and
additional costs related to the construction of the permanent replacement.
Therefore, sufficient evidence supported this jury finding.
      Lastly, Wheeler urges that Pal-Con should not have recovered for the
cost of building the temporary replacement unit because Pal-Con later sold it
for a profit. Although this challenge is subject to plain error review, we agree
with Wheeler that no evidence supports the jury verdict in this regard. The
evidence demonstrated that Pal-Con recouped all of the costs of manufacturing
the temporary unit by reselling it to another customer. Therefore, Wheeler is
entitled to judgment as a matter of law on the damages award for the
temporary replacement module.
                                       III.
      Wheeler asserts that the district court erred by refusing to admit
evidence of Pal-Con and Friend’s negligence and by not instructing the jury to
apportion their liability.    Wheeler also contends that the district court
cumulatively erred by requiring each party to file a list of facts intended to be
proven at trial and limiting the proof of evidence to those facts, prohibiting the
                                        9
   Case: 14-10615     Document: 00513087412     Page: 10    Date Filed: 06/22/2015



                                 No. 14-10615
parties from offering evidence on stipulated facts, requiring deposition
summaries rather than deposition testimony, and limiting live witness
testimony. We reject each of these arguments in turn.
      “The trial court’s evidentiary rulings are reviewed for abuse of discretion.
Even if we find an abuse of discretion, the exclusion of evidence is subject to
harmless error analysis.” United States v. Miller, 
588 F.3d 897
, 903 (5th Cir.
2009) (citations omitted). This court will affirm “[u]nless the exclusion of
evidence affects a substantial right of the defendant[.]” 
Id. at 903–04.
“[T]he
district court has broad discretion in formulating the jury charge, and
therefore, [this court] reviews those instructions with great deference.” Reyes-
Mata v. IBP, Inc., 
299 F.3d 504
, 506 (5th Cir. 2002) (per curiam).
      Wheeler claims that there was evidence of Pal-Con and Friend’s
negligence because Pal-Con did not properly insure its shipment, Pal-Con
failed to consider the qualifications of the motor carrier it chose, and the Pal-
Con employee in charge of shipping the regenerator lacked training and
sufficient qualifications to make shipping decisions. Taking this as true, these
facts do not establish that Pal-Con and Friend’s negligently contributed to the
accident.   Wheeler fails to show that Pal-Con had a duty to insure the
regenerator or that Pal-Con should have known that Friend’s was a risky
shipper. For these reasons, the district court did not abuse its discretion in
refusing to instruct the jury on contributory negligence.
      Furthermore, “[c]umulative error justifies reversal only when errors so
fatally infect the trial that they violated the trial’s fundamental fairness.”
United States v. Delgado, 
672 F.3d 320
, 344 (5th Cir. 2012) (en banc) (internal
quotation marks and citation omitted). Wheeler has not shown that any of the
errors he alleges are actual errors, and he certainly has not met the high
threshold for a finding of cumulative error.


                                       10
   Case: 14-10615   Document: 00513087412       Page: 11   Date Filed: 06/22/2015



                                 No. 14-10615
                                     IV.
     For the foregoing reasons, we REVERSE the jury award for the costs of
manufacturing the temporary replacement module. We therefore VACATE
the judgment and REMAND for correction consistent with our direction. In
all other respects, we AFFIRM.




                                     11
