ROGERS, Circuit Judge.
More than six years after the Commonwealth of Kentucky authorized a surface mining operation in Perry County, this appeal raises the issue of the proper scope of environmental analysis a federal agency must use in issuing a permit related to a small but necessary part of the operation. The Surface Mining Control and Reclamation Act grants Kentucky "exclusive jurisdiction" over the regulation of surface mining within the state, subject to minimum federal standards. In order to conduct surface mining in Kentucky, a mine operator must obtain a permit for the overall operation from Kentucky's Division of Mine Permits, as well as subsidiary permits related to water and stream quality, as required by the Clean Water Act. One of these permits is a § 404 permit, which is issued by the U.S. Army Corps of Engineers and is required for the discharge of dredged or fill material into waters of the United States. After obtaining a permit from the Division of Mine Permits, intervenor Leeco, Inc. applied for and received a § 404 permit from the Corps. The permit authorizes Leeco to "mine through" and fill certain surface stream beds, which are already in a degraded state, and requires Leeco to offset the limited environmental effect of the filling by improving other streams in the watershed.
The plaintiffs challenge the Corps's issuance of the § 404 permit, arguing that the National Environmental Policy Act ("NEPA") requires the Corps to have considered in its environmental assessment the public health impacts related to surface mining in general, and that the Corps violated the Clean Water Act by using a flawed analysis of the associated compensatory mitigation plan. In a comprehensive and thoughtful opinion, the district court rejected the plaintiffs' arguments. This appeal followed. Because the Corps did not abuse its discretion in limiting the scope of its environmental analysis only to health effects closely related to the discharge of dredged or fill material into jurisdictional waters, the Corps did not violate NEPA. And because the Corps's acceptance of Leeco's compensatory mitigation plan was not an arbitrary and capricious exercise of its specialized expertise, the Corps did not violate its requirements under the Clean Water Act. Accordingly, we must uphold the Corps's decision to issue the § 404 permit.
We of course decide only the issues before us — whether the permit at issue in this case complies with the Clean Water Act and the National Environmental Policy Act. Our decision takes no position on the public policy questions of whether surface mining is in the larger public interest, or whether mountaintop removal should be allowed by the Commonwealth of Kentucky.
Congress passed the Surface Mining Control and Reclamation Act of 1977 ("SMCRA") in order to "establish a nationwide program to protect society and the environment from the adverse effects of surface coal mining operations." 30 U.S.C. § 1202(a). The Act set up a system of "cooperative federalism," in which state governments could opt in to regulating
Although a SMCRA permit authorizes all of the activities related to a surface mining operation, it alone may not be sufficient to allow a mine operator to conduct surface mining operations. See Ohio Valley Envtl. Coal. v. Aracoma Coal Co., 556 F.3d 177, 190-91 (4th Cir.2009). Other permits may be required to authorize portions of the operation, if those specific activities are regulated by an independent regulatory program. For example, if a surface mining operation will affect the navigable waters of the United States, the Clean Water Act, 33 U.S.C. § 1251 et seq., which aims to "restore and maintain the chemical, physical, and biological integrity of the Nation's waters" by eliminating "the discharge of pollutants into the navigable waters." 33 U.S.C. § 1251(a)(1), requires a surface mine operator to obtain various other permits related to the quality of water and wetlands.
For the typical surface mining operation, three different Clean Water Act permits are required. First, a mine operator must obtain a § 401 permit from the proper permitting agency to ensure that "any discharge into the navigable waters" complies with regulations designed to limit the discharge of pollutants into navigable waters and to ensure the maintenance of federal water quality standards. Id. § 1341. Second, a mine operator must obtain a § 402 permit for "the discharge of any pollutant, or combination of pollutants." Id. § 1342. Finally, and most relevant to the present litigation, a mine operator must also obtain a § 404 permit "for the discharge of dredged or fill material into the navigable waters at specified disposal sites." Id. § 1344. This final permit must be obtained from the U.S. Army Corps of Engineers. See id. § 1344(d); 33 C.F.R. § 320.2(f).
In conducting its review for a § 404 permit, the Corps is required to comply with guidelines promulgated by the Environmental Protection Agency ("EPA"), which are called the § 404(b)(1) Guidelines. 33 U.S.C. § 1344(b)(1); see also 33 C.F.R. § 320.2(f); 40 C.F.R. pt. 230. The review includes the consideration of the health and welfare of those that would be affected by the discharge into jurisdictional waters. For example, under the regulations, the Corps must not issue a permit if the discharge of dredged or fill material would "cause or contribute to significant degradation of the waters of the United States," which may be constituted by certain effects considered individually and collectively, including "[s]ignificantly adverse effects of the discharge of pollutants on human health or welfare" and "[s]ignificantly adverse effects of discharge of pollutants
In addition to its responsibilities under the Clean Water Act, the Corps must also comply with the requirements of NEPA, 42 U.S.C. § 4321 et seq., which requires federal agencies to "take a `hard look' at the potential environmental consequences of their actions." Aracoma Coal, 556 F.3d at 191 (quoting Robertson v. Methow Valley Citizens Council, 490 U.S. 332, 350, 109 S.Ct. 1835, 104 L.Ed.2d 351 (1989)). NEPA requires federal agencies to prepare a detailed statement, called an environmental impact statement, for every "major Federal action[] significantly affecting the quality of the human environment." 42 U.S.C. § 4332(2)(C); see also 40 C.F.R. § 1502.3. When it is not clear whether an environmental impact statement is required, the agency will prepare an environmental assessment, "a concise public document ... that serves to ... [b]riefly provide sufficient evidence and analysis for determining whether to prepare an environmental impact statement or a finding of no significant impact." 40 C.F.R. §§ 1501.3, 1501.4(b), 1508.9; see also Save Our Cumberland Mountains v. Kempthorne, 453 F.3d 334, 339 (6th Cir. 2006). If an environmental impact statement is not required, the agency must "[p]repare a finding of no significant impact," 40 C.F.R. § 1501.4(e), that "briefly present[s] the reasons why an action ... will not have a significant effect on the human environment and for which an environmental impact statement therefore will not be prepared," id. § 1508.13. In practice, the environmental assessment generally serves as the finding of no significant impact when an environmental impact statement is not required.
The present action concerns a proposed surface coal mining operation
In June 2009 the Department of the Army, the EPA, and the Department of the Interior instituted an interagency action plan intended to "significantly reduce the harmful environmental consequences of Appalachian surface coal mining operations, while ensuring that future mining remains consistent with federal law." Implementing the Interagency Action Plan on Appalachian Surface Coal Mining (June 11, 2009), available at http://www.osmre.gov/resources/mou/ASCM061109.pdf. In response to this plan, the EPA conducted a review of Leeco's pending § 404 permit application. The EPA's preliminary assessment concluded that there were "significant concerns that the project, as proposed, does not comply with the [EPA's] 404(b)(1) Guidelines." The EPA expressed concerns over water quality and mitigation attempts, as well as concern that "the proposed project may have significant human health impacts on the surrounding communities, all of which are low-income communities." In a later letter, the EPA outlined extensive strategies on how to improve the plan.
In response to these concerns from the EPA, Leeco submitted a significantly revised permit application on July 19, 2011. The new application consolidated the fill plan to only one large hollow fill and one sediment control pond. Id. The new plan would impact only 18,268 linear feet of streams, a decrease of 4,593 linear feet. Id. This later design would all together impact 11,607 linear feet of ephemeral streams (that flow only during periods of heavy precipitation), 5,073 linear feet of intermittent streams (that flow continuously only at certain times of the year, usually because the source, such as melting snow, is seasonal), and 1,588 linear feet of perennial streams (that flow year round). The revised application included a compensatory mitigation plan that would require Leeco to replace 8,376 linear feet of stream in the same watershed area, to compensate for the loss of intermittent and perennial streams. In addition, Leeco agreed to pay the Kentucky Department of Fish and Wildlife Resources $752,047.50 in lieu of mitigation for the impacts on ephemeral streams.
The Corps issued a new public notice on August 5, 2011, with a comment period that lasted through August 19, 2011. During this comment period, the Sierra Club submitted comments objecting to the proposal, and attached studies purporting to demonstrate general health concerns related to surface coal mining. On April 3, 2012, the EPA informed the Corps that it had no further concerns regarding the proposed project, indicating the EPA's approval of the new plan. On May 25, 2012, the Corps completed its review and decision to issue the permit, along with a detailed document discussing its decision. In its decision, the Corps found that "issuance or denial of the requested permit would not constitute a major federal action that would significantly affect the quality of the human environment," and that that determination "constitutes a Finding of No Significant Impact." The Corps finally granted Leeco the § 404 permit on July 26, 2012.
On October 17, 2012, the plaintiffs Kentuckians for the Commonwealth, a grass-roots
After motions and cross-motions for partial summary judgment, the district court, in a thoroughly reasoned opinion, granted summary judgment in favor of the Corps on all counts, dismissing the suit in its entirety on August 23, 2013. Kentuckians for the Commw. v. U.S. Army Corps of Eng'rs, 963 F.Supp.2d 670, 692-93, No. 3:12-CV-00682, 2013 WL 4516774, at *21 (W.D.Ky. Aug. 23, 2013). The court first held that the plaintiffs had standing because their members alleged an injury in the form of possible detrimental effects to their health, livelihood, and outdoor recreational pursuits. Id. at 679-80, 2013 WL 4516774 at *8. Regarding the NEPA claim, the court held that the Corps properly limited the scope of review to the filling of jurisdictional waters, because "under SMCRA, it is the [Kentucky Division of Mine Permits], and not the Corps, that has control and responsibility over the Stacy Branch mine site as a whole," and the Corps was otherwise entitled to deference on the scope of review. Id. at 681-83, 2013 WL 4516774 at *10. The court also held that the plaintiffs' comments during the second comment period that cited human health studies did not constitute "significant new information" requiring a supplemental environmental assessment. Id. at 684-85, 2013 WL 4516774 at *12. With reasoning similar to that applied to the NEPA claim, the court held that the Corps properly limited the scope of its review regarding public health under the Clean Water Act § 404(b)(1) Guidelines, and that its environmental justice review under the Guidelines was not thereby arbitrary and capricious. Id. at 684-86, 2013 WL 4516774 at *12-13. In addressing the mitigation claim, the court first expressed doubt that the 2008 regulations pertaining to the assessment of mitigation plans applied to the permit, which was first submitted in 2007. Id. at 686-87, 2013 WL 4516774 at *14. The court held that, regardless of whether the 2008 regulations apply, the Corps adequately assessed stream function in its review of the mitigation plan, that it did not act arbitrarily and capriciously in relying on the Eastern Kentucky Stream Assessment Protocol, that it did not act inconsistently with regulations in approving an in-lieu fee payment to a stream-and-mitigation trust fund, and that its analysis of and plan for monitoring stream conductivity were not arbitrary and capricious. Id. at 686-92, 2013 WL 4516774 at *14-20.
This appeal followed. On September 9, 2013, the district court issued an injunction pending this appeal.
We review this grant of summary judgment in a challenge to the Corps's permitting decision under the
Id. (quoting Nat'l Ass'n of Home Builders v. Defenders of Wildlife, 551 U.S. 644, 658, 127 S.Ct. 2518, 168 L.Ed.2d 467 (2007)).
"Judicial review of NEPA compliance is limited in scope." Id. (quoting Cmtys., Inc. v. Busey, 956 F.2d 619, 623 (6th Cir.1992)). Judicial review "ensure[s] that the agency has adequately considered and disclosed the environmental impacts of its actions and that its decision is not arbitrary or capricious." Id. (quoting Balt. Gas & Elec. Co. v. Nat'l Res. Def. Council, 462 U.S. 87, 97-98, 103 S.Ct. 2246, 76 L.Ed.2d 437 (1983)). "Because NEPA is a procedural and not a results-driven statute, even agency action with adverse environmental effects can be NEPA-compliant so long as the agency has considered those effects and determined that competing policy values outweigh those costs." Ohio Valley Envtl. Coal. v. Aracoma Coal Co., 556 F.3d 177, 191 (4th Cir.2009) (citing Robertson v. Methow Valley Citizens Council, 490 U.S. 332, 350, 109 S.Ct. 1835, 104 L.Ed.2d 351 (1989)).
On appeal, the plaintiffs have maintained two challenges to the Corps's decision to issue the § 404 permit. First, the plaintiffs argue that the Corps violated NEPA by failing to consider the public health effects of the overall mining activity in conducting its NEPA review of the environmental effects of granting the § 404 permit, especially having considered overall economic benefits of the mining operation. Second, the plaintiffs argue that the Corps violated the Clean Water Act's mitigation requirements by using a flawed analysis to assess the functional effects of the mitigation plan and by failing to substantiate one figure used in the calculation of the mitigation assessment protocol.
First, the Corps did not violate NEPA by deciding not to consider the evidence linking surface coal mining in general to public health problems. In discussing the public health consequences of granting the § 404 permit, the Corps properly focused on the possible public health effects of discharges on the local water supply, as well as those effects caused by air pollution created by the machines that would be conducting permit-relevant site preparation and operations. The Corps reasonably limited its scope of review to the effects proximately caused by the specific activities that were authorized by the permit. Most importantly, the Corps complied with the relevant regulations interpreting and implementing NEPA's requirements.
The Corps did not entirely ignore the public health effects of granting the permit, but rather reasonably limited its scope of analysis only to those human health effects closely related to the discharge of fill or dredged material into jurisdictional stream beds. For example, the Corps assessed the potential impact of the permit activities on the local water supply, and it concluded, in large part because the nearest municipal water supply intake was a significant distance from the operation, that "it is not anticipated that this proposed project would affect the water supply." Also, the Corps considered the effects of the permit activities on air
The Corps acted without abusing its discretion when it determined that the scope of its NEPA analysis should be limited to the local, proximate effects of the dredging and filling activities that were specifically authorized by the permit. The Council on Environmental Quality's regulations grant the Corps some discretion in performing the analysis of whether a federal action is significant enough to warrant an environmental impact statement. With respect to potential health effects, the Council's regulations suggest only that public health effects "should be considered," 40 C.F.R. § 1508.27(b) (emphasis added). And when a set of effects is considered, the regulations allow substantial flexibility in delimiting which subsets of effects are relevant. In particular, the context of the federal agency's action should be considered in determining the scope of its relevant effects: "Significance varies with the setting of the proposed action. For instance, in the case of a site-specific action, significance would usually depend upon the effects in the locale rather than in the world as a whole." Id. § 1508.27(a).
The Corps was not required, as the plaintiffs contend, to expand the scope of its review beyond the effects of the filling and dredging activity to the effects of the entire surface mining operation as a whole. The Corps regulations, the validity of which is not in dispute, govern the Corps's obligations under NEPA. Those regulations state that any NEPA document related to a permit should only "address the impacts of the specific activity requiring a [Corps] permit and those portions of the entire project over which the district engineer has sufficient control and responsibility to warrant Federal review." 33 C.F.R. pt. 325, app. B § 7(b)(1). Here, the overall mining project is not the specific activity authorized by the § 404 permit, nor does the Corps's district engineer maintain sufficient control and responsibility over other portions of the entire project to warrant federal review.
The specific activity that is the subject of the permit is only the dredging and filling of jurisdictional waters. The Clean Water Act, as only one aspect of a more comprehensive multi-permit regulatory scheme, requires the Corps to provide a § 404 permit only for the "discharge of dredged or fill material into the navigable waters." 33 U.S.C. § 1344(a). The statement accompanying the Corps's NEPA implementing regulations confirms the limited purpose of § 404, stating that "[t]he Corps authorizes the discharge of dredged or fill material in 404 permits" and that, "[t]herefore, the activity the Corps studies in its NEPA document is the discharge of dredged or fill material." Environmental Quality; Procedures for Implementing the National Environmental Policy Act (NEPA), 53 Fed.Reg. 3120, 3121 (Feb. 3, 1988) ("Corps Procedures").
In any case, because the question of the proper scope of analysis in the environmental assessment entails interpretation of the Corps's own regulations, the Corps is entitled to substantial deference with regard to its determination that the district engineer lacked "sufficient control and responsibility" to warrant review of other portions of the entire mining project.
This reasoning properly weighed two of the factors that the Corps's regulations use to determine whether there is sufficient control and responsibility to warrant the Corps to expand its scope of analysis to other portions of the state-authorized mining activity: "[t]he extent to which the entire project will be within Corps jurisdiction" and "[t]he extent of cumulative Federal control and responsibility." 33 C.F.R. Pt. 325, App. B § 7(b)(2)(iii)-(iv).
The Corps decision in this regard is consistent with the congressional design of both NEPA and the regulatory scheme at issue. Regarding surface coal mining regulation, Congress intended that primary regulatory power be placed in only one agency, in this case the Kentucky Department for Natural Resources. There are many considerations that must be balanced before authorizing a massive and environmentally significant operation, and Congress has determined that such a careful and sensitive decision is best made primarily by one decisionmaker. There are good reasons that Congress would not have designed a regulatory system in which each regulatory actor involved in a large operation, even in a comparatively minor way, is required to consider all of the effects of the overall project.
The restriction of the Corps's scope of analysis is consistent with the congressional policy to give to state governments the primary responsibility to regulate overall surface mining operations. In enacting SMCRA, Congress declared that "the primary governmental responsibility for developing, authorizing, issuing, and enforcing regulations for surface mining and reclamation operations ... should rest with the States." 30 U.S.C. § 1201(f); see also Horizon Coal Corp. v. United States, 43 F.3d 234, 240 (6th Cir. 1994) (quoting Save Our Cumberland Mountains, Inc. v. Lujan, 963 F.2d 1541, 1544 (D.C.Cir.1992)). The Corps, when it adopted its NEPA-implementing regulations, stated that "in order to prevent the unwarranted situation where `the Federal tail wags the non-Federal dog', the scope of analysis would be confined to the environmental effects of only the activity requiring a Corps permit." Corps Procedures, 53 Fed.Reg. at 3122. To thwart Kentucky's decision to permit surface mining by permitting the Corps to consider effects of the entire mining operation in its decisionmaking process would violate Congress's intent to place primary responsibility for surface mining with state regulators.
The most closely analogous circuit court case, Ohio Valley Environmental Coalition v. Aracoma Coal Co., 556 F.3d 177 (4th Cir.2009), strongly and persuasively supports the Corps's decision to limit its scope of analysis. Like the instant case, Aracoma Coal involved the Corps's NEPA obligations during the consideration of a § 404 permit application related to surface mining operations in a state in which the state manages an approved SMCRA regulatory program. See id. at 195. Recognizing that "[t]he Corps' jurisdiction under [Clean Water Act] § 404 is limited to the narrow issue of the filling of jurisdictional waters," id., and that "[u]nder SMCRA, the state of West Virginia has `exclusive jurisdiction over the regulation of surface coal mining and reclamation operations,'" id. (quoting 30 U.S.C. § 1253), the Fourth Circuit held that the Corps did not act arbitrarily and capriciously in determining that its scope of review in issuing a finding of no significant impact did not "extend[] beyond the Corps' limited jurisdiction to include environmental effects on upland areas," id. at 197.
The plaintiffs incorrectly argue that "[i]f the Corps does not investigate and address these serious health concerns, no agency will." Appellants' Reply Br. at 11. First, the Corps actually did consider public health in its substantive review of the § 404 permit. The EPA, which signed off on the permit and with which the Corps coordinated in reviewing the § 404 permit application's compliance with the Clean Water Act and its associated regulations, specifically addressed concerns that "the proposed project may have significant health impacts on the surrounding communities, all of which are low-income communities."
More importantly, Kentucky's Division of Mine Permits, in complying with the federal standards contained in SMCRA and through is power to impose stricter standards in Kentucky, has the means to address public health concerns associated with surface coal mining. SMCRA is designed in part to "to protect society and the environment from the adverse effects of surface coal mining operations," 30 U.S.C. § 1202(a), through "the establishment of appropriate standards to minimize damage to the environment and to productivity of the soil and to protect the health and safety of the public," id. § 1201(d). Kentucky's surface mining permitting program, as required by the comprehensive minimum federal standards, includes extensive regulations designed to minimize the harmful impacts of surface mining activities. This includes requirements to "minimize disturbance of the hydrologic balance in both the permit area and adjacent areas," 405 Ky. Admin. Regs. 16:060 § 1(1), to ensure that "[d]ischarges of water from areas disturbed by surface mining activities shall at all times be in compliance with all applicable federal and state water quality standards," id. 16:070 § 1(1)(g), to place excess spoil in designated areas designed to "[m]inimize the adverse effects of leachate and surface water run-off from the fill on surface and ground water," id. 16:130 § 1(1)(a), and to "minimize disturbances and adverse impacts on fish, wildlife, and related environmental values, and... achieve enhancement of those resources where practicable," id. 16:180 § 1(1). Generally, Kentucky's regulatory program maps directly onto the federal minimum requirements established by any regulations passed pursuant to SMCRA. Ky.Rev.Stat. § 350.069. These comprehensive regulations, promulgated by the U.S. Department of the Interior and adopted by Kentucky's Department for Natural Resources, are intended to "strike a balance between protection of the environment and agricultural productivity and the Nation's need for coal as an essential source of energy." 30 U.S.C. § 1202(f). To the extent that there is scientific evidence establishing that surface mining is generally bad for the public health, the plaintiffs should raise these concerns with those agencies in which Congress has placed the primary responsibility of regulating surface mining, either the federal Office of Surface Mining or the federally approved state regulators.
The plaintiffs also argue that the Corps violated its NEPA regulations by considering the positive economic impacts of the overall mining project without considering the public health impacts of the overall mining operation. This argument fails to take into account that the Corps has other obligations besides its NEPA obligations, and that the final decision document
In determining to issue a finding of no significant impact, the Corps performed an environmental assessment, limited in scope pursuant to the Corps's own regulations designed to determine whether a permit decision requires an environmental impact statement. The content of this analysis is rational and appears to be thorough. That ends the inquiry. There is no substantive component to NEPA review; this court may only "insist that the agency has, in fact, adequately studied the issue and taken a hard look at the environmental consequences of its decision." Meister v. U.S. Dep't of Agric., 623 F.3d 363, 377 (6th Cir.2010). The Corps reasonably complied with its own regulations and did not act arbitrarily and capriciously.
With respect to the plaintiff's second claim on appeal, namely that the mitigation plan violates the Clean Water Act, the Corps did not act arbitrarily and capriciously in determining that the compensatory mitigation plan proposed by Leeco in its 2011 permit application complied with the requirements of the § 404(b)(1) Guidelines.
First, the Corps was entitled to rely on the Eastern Kentucky Stream Assessment Protocol ("EKSAP"), which provides for an assessment of functional stream quality in determining whether a mitigation plan sufficiently replaces the aquatic functionality of lost streams. According to the Corps's decision document, the EKSAP is the product of federal and state interagency initiative and is designed to "assess[] the relative quality of a particular headwater stream ecosystem based on observations of regional indicator data concerning its physical[,] ... chemical[,] ... and biological... characteristics and provides an estimate of the integrity of the system as a whole." The use of this type of metric complies with regulations and is consistent with relatively recent changes in mitigation plan policy. In 2008, the Corps and the EPA passed regulations confirming the validity of — indeed, a preference for — functional metrics designed "to replace lost aquatic resource functions." See 33 C.F.R. § 332.3(f)(1); Compensatory Mitigation for Losses of Aquatic Resources, 73 Fed.Reg.
Lastly, the Corps permissibly based its estimation of an eighty-percent likelihood of success on its experience with other mitigation projects. Without any evidence that the Corps's ballpark figure is way off the mark, this court can defer to the expertise of the Corps in fulfilling its requirement to "assess the likelihood for ecological success and sustainability" in evaluating a compensatory mitigation plan. 33 C.F.R. § 332.3(a)(1). The sources cited by the plaintiff do not persuasively demonstrate that the mitigation is likely to be unsuccessful, since the pessimistic assessments of mitigation they cite are from reports over ten years old, which came out before the Corps's adoption of the functional "watershed approach" in 2008. E.g., Compensatory Mitigation for Losses of Aquatic Resources, 73 Fed.Reg. at 19,594. As further assurance of mitigation success, the possibility of failure in the primary mitigation plan is prepared for in a contingency plan that would be triggered in the circumstance that Leeco does not accomplish the mitigation plan. Moreover, one of the conditions of the mitigation plan is that a certain number of units of functional stream quality "would be held as a contingency against failure of the restoration to reach the predicted EKSAP scores."
In short, the Kentucky Division of Mine Permits, to which Congress has granted exclusive jurisdiction over the regulation of surface mining in Kentucky, approved Leeco's surface mining operation. Meanwhile, the Corps of Engineers granted a secondary permit related only to the filling of jurisdictional waters. The Corps, in light of the entire project's approval under the more comprehensive SMCRA, did not abuse its discretion in limiting the scope of its NEPA review to environmental consequences closely related to the filling of jurisdictional stream beds. Where an existing state regulatory scheme already governs surface coal mining, NEPA does not require the Corps to expand its review to the environmental consequences of the
The district court's judgment is AFFIRMED.
Kentuckians for the Commw. v. U.S. Army Corps of Eng'rs, 963 F.Supp.2d 670, 672-73, No. 3:12-CV-00682, 2013 WL 4516774, at *1 (W.D.Ky. Aug. 23, 2013).
It is true that Congress gave the authority to interpret NEPA in a general sense to the Council on Environmental Quality, Andrus v. Sierra Club, 442 U.S. 347, 358, 99 S.Ct. 2335, 60 L.Ed.2d 943 (1979), which Congress instituted to "consult[] with" agencies to "insure that presently unquantified environmental amenities and values may be given appropriate consideration in decisionmaking along with economic and technical considerations." 42 U.S.C. § 4332(2)(B). Pursuant to this mandate, the Council has instituted a number of regulations to help guide federal agencies in executing their NEPA obligations. However, the Council has also granted agencies significant flexibility in interpreting NEPA's requirements for purposes of conducting their own independent NEPA reviews. See, e.g., 40 C.F.R. § 1507.1. Indeed, the Council's regulations require federal agencies to, "as necessary, adopt procedures to supplement" the Council's regulations, in particular procedures related to the identification of which actions require an environmental impact statement and which do not, and that such implementing regulations should be adopted after opportunity for public review and review by the Council. See id. § 1507.3.
Under instruction from the Council, the Corps has instituted its own regulations to guide its preparation of NEPA-compliant environmental assessments and environmental impact statements. See 33 C.F.R. § 230.1; id. pt. 325, app. B. And because the Corps promulgated the specific regulations that govern the question of how great the scope of the Corps's NEPA review is, see 40 C.F.R. pt. 1507, the Corps is entitled to deference with respect to the interpretation of those provisions.