COLLEEN KOLLAR-KOTELLY, District Judge.
Plaintiffs, WildEarth Guardians, Sierra Club, and Defenders of Wildlife, bring this Administrative Procedure Act ("APA") action against the Secretary of the U.S. Department of the Interior (the "Secretary") and the Director of the Bureau of Land Management (the "BLM") (together, the "Federal Defendants"), challenging the BLM's denial of WildEarth Guardians' petition seeking the recertification of the Powder River Basin as a "coal production region" under 43 C.F.R. § 3400.5. Intervening as defendants are the State of Wyoming, the National Mining Association, and the Wyoming Mining Association (collectively, "Defendant-Intervenors").
Currently before the Court are the parties' cross-motions for summary judgment. Upon careful consideration of the parties' submissions, the relevant authorities, and the record as a whole, the Court finds that Plaintiffs have failed to discharge their burden of establishing that they meet the irreducible constitutional minimum of standing. Accordingly, the action shall be DISMISSED WITHOUT PREJUDICE for lack of jurisdiction. The Court does
The Mineral Leasing Act of 1920 (the "Act") provides that "[d]eposits of coal ... and lands containing such deposits owned by the United States ... shall be subject to disposition in the form and manner provided in this chapter." 30 U.S.C. § 181. Under the Act, the Secretary is permitted to lease public lands for coal mining operations after conducting a competitive bidding process:
30 U.S.C. § 201(a)(1). By its terms, the Act mandates that any coal leasing authorized by the Secretary be done by competitive bidding and prescribes conditions for such leasing-for example, by requiring accepted bids to meet or exceed fair market value. However, the Act has little to say about the competitive bidding process itself. Instead, Congress elected to confer upon the Secretary "sweeping authority" to promulgate regulations designed to carry out the statutory command. Indep. Petroleum Ass'n of Am. v. DeWitt, 279 F.3d 1036, 1039 (D.C.Cir.2002), cert. denied sub nom. Indep. Petroleum Ass'n of Am. v. Watson, 537 U.S. 1105, 123 S.Ct. 869, 154 L.Ed.2d 774 (2003); see also 30 U.S.C. § 189 ("The Secretary of the Interior is authorized to prescribe necessary and proper rules and regulations to do any and all things necessary to carry out and accomplish the purposes of this chapter.").
Pursuant to his broad authority, the Secretary enacted regulations delineating how the BLM would "conduct competitive leasing of rights to extract [f]ederal coal." 43 C.F.R. § 3420.0-1. The regulations provide for two different coal leasing processes: (1) the regional leasing process; and (2) the leasing-by-application process. See 43 C.F.R. pt. 3420. Both processes are forms of competitive leasing, as both contemplate an open, public, and competitive sealed-bid process and both preclude the BLM from issuing a coal lease if the highest bid does not meet or exceed fair market value. See 43 C.F.R. §§ 3422.1, 3422.2, 3425.4.
The regional leasing process is primarily agency-driven, with the BLM identifying public lands for prospective use and offering coal leases for sale. See RULES & REGULATIONS: PUBLIC PARTICIPATION IN COAL LEASING, 64 Fed.Reg. 52,239, 52,240 (Sept. 28, 1999). The regional leasing process applies only in areas designated as "coal production regions," which are creatures of regulation and the boundaries of which the BLM is empowered to alter:
43 C.F.R. § 3400.5. This provision was designed to "[a]uthorize the Bureau of Land Management to establish coal production regions for the purpose of setting coal
The leasing-by-application process, in contrast, is primarily applicant-driven, with the applicant assuming responsibility for identifying public lands for potential use and proposing specific tracts for leasing. See id. §§ 3425.0-2-3425.5. The leasing-by-application process applies in "areas outside coal production regions" and in areas within coal production regions "where an emergency need for unleased coal deposits is demonstrated." Id. §§ 3425.0-2, 3425.1-5. Unlike the regional leasing process, the leasing-by-application process is not structured around regional leasing levels, but the BLM must nevertheless perform an environmental analysis. See id. § 3425.4.
In 1979, the BLM established several coal production regions, including the Powder River Coal Production Region, an administrative area corresponding to the Powder River Basin — a geographic area of approximately 24,000 square miles spanning northeastern Wyoming and southeastern Montana. See IDENTIFICATION OF COAL PRODUCTION REGIONS HAVING MAJOR FEDERAL COAL INTERESTS, 44 Fed.Reg. 65,196, 65,196 (Nov. 9, 1979). As a result, beginning in 1979, any leasing in the Powder River Basin was presumptively to be conducted in accordance with the regional leasing process, which remained the state of affairs for the next decade.
In 1989, however, the BLM solicited public comments on the potential total or partial decertification of the Powder River Coal Production Region, citing such considerations as "limited leasing interest in the region, soft market considerations for the foreseeable future, [] public input," and "administrative efficiency." PROPOSED DECERTIFICATION OF ALL OR A PORTION OF THE POWDER RIVER COAL PRODUCTION REGION, 54 Fed.Reg. 6,339, 6,339-6,340 (Feb. 9, 1989); see also POWDER RIVER REGIONAL COAL TEAM ACTIVITIES: PUBLIC MEETING ANNOUNCEMENT, 54 Fed.Reg. 35,941 (Aug. 30, 1989). The BLM noted that "if the region were partially or totally decertified, then these areas would be opened to leasing-by-application," but left open the possibility "for the re-establishment of the regional activity planning process, should market conditions strengthen and more widespread leasing again become[] necessary." PROPOSED DECERTIFICATION OF ALL OR A PORTION OF THE
On January 9, 1990, the BLM formally decertified the Powder River Coal Production Region as a coal production region, which had the effect of replacing the regional leasing process with the leasing-by-application process in that area. See DECERTIFICATION OF THE POWDER RIVER COAL PRODUCTION REGION, 55 Fed.Reg. 784, 784 (Jan. 9, 1990). The BLM adopted the recommendation of the regional coal team that the region be completely decertified subject to certain conditions. Id. Therefore, beginning in early 1990, "[f]ederal coal lease applications [could] ... be filed in accordance with 43 C.F.R. § 3425" — that is, pursuant to the leasing-by-application process. Id. at 785. Since then, the leasing-by-application process has been the exclusive leasing method used by the BLM in the Powder River Basin. Indeed, because the BLM has decertified all other coal production regions, the leasing-by-application process is now the exclusive leasing method used nationwide. J.A. 5.
On November 23, 2009, WildEarth Guardians filed a five-page petition with the BLM, accompanied by a written report, seeking the recertification of the Powder River Basin as a coal production region under 43 C.F.R. § 3400.5. J.A. 9-50.
On January 8, 2011, the BLM denied WildEarth Guardians' petition in a thorough eight-page decision. J.A. 1-8. The BLM concluded that the Powder River Basin continued to be effectively managed "as a decertified coal region." J.A. 7. First, the BLM found that, despite the "growth" in production in the region, leasing had occurred at "essentially the same rate as reserves have been depleted" and "no new mining operations" had opened since decertification. J.A. 4. Second, the BLM found that decertification was conducive to "maintenance leasing," under which existing operations expand into adjacent tracts as reserves are depleted "without leaving tracts un-leased and undeveloped." J.A. 4. Third, the BLM found that because the regional leasing process requires the agency to "complete geologic exploration activities and fund regional NEPA analysis," its "current budget forecast and possible lack of personnel" were such that adoption of the regional leasing process could result in a "reduced return to the public from coal sales (due to timing), a higher potential for bypass ..., and forced emergency leasing." J.A. 5. Fourth, the BLM found that "sales are always competitive" under either leasing process "because the BLM sets a [fair market value]... and will not accept any bid that does not meet that value." J.A. 5. Fifth, the BLM found that the leasing-by-application process requires the agency to conduct environmental analyses in connection with
Plaintiffs commenced this action on April 4, 2011, asserting a single claim for relief under the APA based on their contention that the BLM's denial of WildEarth Guardians' petition was arbitrary, capricious, and contrary to law. See Compl. for Declaratory Judgment & Injunctive Relief, ECF No. [1], ¶¶ 54-58. The Federal Defendants appeared and answered the Complaint. See Fed. Defs.' Answer, ECF No. [16]. The State of Wyoming, the National Mining Association, and the Wyoming Mining Association were granted leave to intervene as defendants and answered the Complaint. See Order (June 23, 2011), ECF No. [18]; State of Wyoming's Answer, ECF No. [19]; Wyoming Mine Association's Answer, ECF No. [20]; Answer & Affirmative Defenses of National Mining Association, ECF No. [22].
The Federal Defendants filed the Administrative Record on August 18, 2011. See Fed. Defs.' Notice of Lodging & Serving of Admin. R., ECF No. [26]. Plaintiffs then moved to "correct" the record, claiming it did not include certain materials that were allegedly before the BLM when it denied WildEarth Guardians' petition. On November 9, 2011, the Court denied Plaintiffs' motion, finding they had "failed to meet their burden of adducing clear and concrete evidence demonstrating that the administrative record certified by the Federal Defendants in this action is incomplete." Mem. Op. & Order (Nov. 9, 2011), ECF No. [37], at 8.
Thereafter, the parties proceeded to brief the pending cross-motions for summary judgment. The motions are now fully briefed and ripe for adjudication. While the Court's decision today is based on the record as a whole, its consideration has focused on the following documents, listed in chronological order of their filing: Mem. of P. & A. in Supp. of Mot. for Summ. J. by Pls., ECF No. [40] ("Pls.' [40] Mem."); Def-Intervenors' Mem. of P. & A. in Supp. of Their Cross-Mot. for Summ. J. & in Opp'n to Pls.' Mot. for Summ. J., ECF Nos. [41], [42]; Fed. Defs.' Combined Mem. of Law in Supp. of Their Cross-Mot. for Summ. J. & in Opp'n to Pls.' Mot. for Summ. J., ECF Nos. [43-1], [44]; Reply in Supp. of Mot. for Summ. J. by Pls. & Resp. in Opp'n to Defs.' & Intervenors' Cross-Mots. for Summ. J., ECF Nos. [45], [46] ("Pls.' [46] Mem."); Def.-Intervenors' Reply in Supp. of Their Cross-Mot. for Summ. J., ECF No. [48]; Fed. Defs.' Reply Mem. in Supp. of Their Cross-Mot. for Summ. J., ECF No. [49]. In an exercise of its discretion, the Court finds that holding oral argument on the pending motions would not be of assistance in rendering a decision. See LCvR 7(f).
"Article III of the Constitution limits the `judicial power' of the United States to the resolution of `cases' and `controversies.'" Valley Forge Christian Coll. v. Ams. United for Separation of Church & State, Inc., 454 U.S. 464, 471, 102 S.Ct. 752, 70 L.Ed.2d 700 (1982). "In order to establish the existence of a case or controversy within the meaning of Article III, [a] party must meet certain constitutional mimima," including "the requirement that... it has standing to bring the action." Gettman v. DEA, 290 F.3d 430, 433 (D.C.Cir.2002). The "irreducible constitutional minimum" of standing requires: (1) an injury in fact; (2) causation; and (3) redressability. Lujan v. Defenders of
In this case, Plaintiffs concede, as they must, that the BLM's mere denial of WildEarth Guardians' petition is insufficient to support their standing. See Gettman, 290 F.3d at 433-34 (rejecting the suggestion that an agency's denial of a rulemaking petition confers "automatic standing" upon the petitioner). Instead, Plaintiffs argue three different theories of standing: (1) procedural standing; (2) informational standing; and (3) substantive standing. The Court addresses each theory in turn.
In standing doctrine, "`procedural rights' are special: The person who has been accorded a procedural right to protect his concrete interests can assert that right without meeting all the normal standards for redressability and immediacy." Defenders of Wildlife, 504 U.S. at 573 n. 7, 112 S.Ct. 2130. Specifically, "[a] plaintiff who alleges a deprivation of a procedural protection to which he is entitled never has to prove that if he had received the procedure the substantive result would have been altered. All that is necessary is to show that the procedural step was connected to the substantive result." Sugar Cane Growers Co-op. of Fla. v. Veneman, 289 F.3d 89, 94-95 (D.C.Cir.2002).
While the normal standards of redressability and immediacy are "relaxed" in this context, the requirements of injury in fact and causation are not. Ctr. for Law & Educ. v. Dep't of Educ., 396 F.3d 1152, 1157 (D.C.Cir.2005). To establish procedural standing, the plaintiff must still (1) identify a procedural right afforded by statute and designed to protect the plaintiff's concrete and personal interest, (2) show that the defendant omitted the required procedure, and (3) demonstrate that it is substantially probable that the procedural breach will cause injury to the plaintiff's concrete and personal interest. See Fla. Audubon Soc. v. Bentsen, 94 F.3d 658, 664-65 (D.C.Cir.1996) (en banc); N.Y. Reg'l Interconnect, Inc. v. FERC, 634 F.3d 581, 587 (D.C.Cir.2011); Ctr. for Law & Educ., 396 F.3d at 1157. As this standard makes clear, "deprivation of a procedural right without some concrete interest that is affected by the deprivation — a procedural right in vacuo — is insufficient to create Article III standing." Summers v. Earth Island Inst., 555 U.S. 488, 496, 129 S.Ct. 1142, 173 L.Ed.2d 1 (2009).
Plaintiffs contend that they can invoke the relaxed standard for procedural standing because they are "being denied procedural opportunities that they would have if the Powder River Basin was designated as a Coal Production Region and leasing was conducted pursuant to the [Regional] Leasing process." Pls.' [40] Mem. at 12 (citing Decl. of Jeremy Nichols ("Nichols Decl."), ECF No. [40-1], ¶ 14). Specifically, Plaintiffs claim that if the BLM granted WildEarth Guardians' petition, and if the Powder River Basin was recertified as a coal production region, then the BLM would be required to establish regional leasing levels under 43 C.F.R. § 3420.2(c), delineate lease tracts and rank them in order of prioritization under §§ 3420.3-1 and 3420.3-4(a), prepare a regional lease sale environmental impact statement under § 3420.3-4(c), and publish a regional lease sale schedule under § 3420.5-1. See Nichols Decl. ¶ 14.
Plaintiffs put the cart before the horse. In support of their procedural standing theory, all Plaintiffs claim is that if the BLM reached a different substantive result on WildEarth Guardians' petition, then they might benefit from certain procedural protections attaching to the regional leasing process down the road. Plaintiffs do not claim that the BLM omitted a procedural requirement before denying WildEarth Guardians' petition — the only agency action at issue in this case. Nor could they. The BLM satisfied the few procedural requirements mandated in this context: it provided WildEarth Guardians with notice of its denial of the petition and "a brief statement of the grounds." 5 U.S.C. § 555(e).
Accordingly, the Court concludes that Plaintiffs have failed to establish that they have procedural standing to pursue this case.
The concept of informational standing is unique in standing doctrine; if not properly cabined, it runs the risk of swallowing the limitations placed on the exercise of judicial power by Article III. See generally Cass R. Sunstein, Informational Regulation & Informational Standing: Akins and Beyond, 147 U.PA. L.REV. 613 (1999). Therefore, informational standing "arises only in very specific statutory contexts where a statutory provision has explicitly created a right to information." Ass'n of Am. Physicians & Surgeons, Inc. v. FDA, 539 F.Supp.2d 4, 15 (D.D.C.2008) (internal quotation marks omitted), aff'd, 358 Fed.Appx. 179 (D.C.Cir.2009) (per curiam), cert. denied, ___ U.S. ___, 131 S.Ct. 1062, 178 L.Ed.2d 863 (2011).
Plaintiffs contend they are "being denied information that they would otherwise be able to obtain if the Powder River Basin was designated as a Coal Production Region." Pls.' [40] Mem. at 12 (citing Nichols Decl. ¶ 14). In their briefs, Plaintiffs identify a single "example" of their alleged informational injuries. Plaintiffs contend that if the BLM granted WildEarth Guardians' petition, and if the BLM recertified the Powder River Basin as a coal production region, then "[t]he first step in the regional coal leasing process... is to prepare a long range market analysis" and "this information would be useful" to Plaintiffs' members. Pls.' [46] Mem. at 5 (citing J.A. 144).
Accordingly, the Court concludes that Plaintiffs have failed to establish that they have informational standing to pursue this case.
To establish substantive standing, a plaintiff "must show (1) an injury in fact that is `concrete and particularized' and `actual or imminent'; (2) that the injury is
Plaintiffs claim that they have substantive standing because their members have reasonable concerns that the climate and other environmental impacts of coal mining under the leasing-by-application process will harm their aesthetic and recreational interests in the Powder River Basin and its wildlife. See Pls.' [40] Mem at 10-11.
Plaintiffs claim that the BLM's denial of WildEarth Guardians' petition harms their aesthetic and recreational interests because mining in the Powder River Basin will result in increased air, water, and land pollution and various climate change impacts such as greater drought conditions and a reduction in biodiversity. See Pls.' [40] Mem. at 11-12 (citing Nichols Decl. ¶¶ 17-22, 28-46). Plaintiffs reason that their injuries would be redressed by a favorable outcome in this case because, if the Powder River Basin was recertified, the BLM "could set a ceiling on coal leasing" and there could be an overall reduction in coal production in the region, thereby reducing adverse environmental impacts. Id. at 12 (citing Nichols Decl. ¶¶ 47-50).
Plaintiffs have not shown that their alleged injuries are likely to be redressed by a favorable decision in this case. Preliminarily, Plaintiffs imply that a favorable outcome here would inexorably lead to the recertification of the Powder River Basin, but that is not the case. WildEarth
Ultimately, though, the disconnect between the outcome of WildEarth Guardians' petition, and a determination as to whether recertification is appropriate and, if so, the form it should take, is the least of Plaintiffs' problems. Even assuming, for the sake of argument, that recertification happens more or less as Plaintiffs envision, Plaintiffs still have not shown that their alleged injuries are likely to be redressed by a favorable decision in this case. Plaintiffs claim that, with recertification, the BLM "could set a ceiling on coal leasing," Pls.' [40] Mem. at 12, but their assumption that regional leasing would be set at a level that would redress their alleged injuries is speculative because the regional leasing process does not evince a preference for a particular level of leasing. Rather, when setting regional leasing levels, the BLM considers a multitude of diverse factors, including, but not limited to: the economic, social, and environmental effects of leasing on the region; industry interest and competition in the region; demand for coal reserves; and national energy needs and coal production goals. See 43 C.F.R. § 3420.2(c). Nor does the BLM set regional leasing levels in a vacuum, but rather can exercise its expertise only after considering input from the public, regional coal teams, affected Indian tribes, the governors of affected States, and the U.S. Department of Justice. See id.
Similarly, Plaintiffs claim that "[r]ecertification could also lead to reduced coal production in the Powder River Basin," Pls.' [40] Mem. at 12, but countless independent actions — some by the BLM and some by third parties — must intervene between recertification and actual coal production. See generally NRDC, Inc. v. Jamison,
The central point is this: the denial of WildEarth Guardians' petition and the recertification of the Powder River Basin are many, many steps removed from the injuries identified by Plaintiffs. Plaintiffs' theory of redressability depends on "a lengthy chain of conjecture," Fla. Audubon Soc., 94 F.3d at 666, that piles "speculation upon hypothetical upon speculation," N.Y. Reg'l Interconnect, 634 F.3d at 587. Moreover, "[e]ven if all these additional events transpired, [Plaintiffs'] injury would be caused by some action other than" the specific agency action before the Court. Occidental Permian Ltd. v. FERC, 673 F.3d 1024, 1026 (D.C.Cir.2012). Accordingly, the Court concludes that Plaintiffs have also failed to establish that they have substantive standing to pursue this case.
Standing is a jurisdictional requirement. Holistic Candlers & Consumers Ass'n v. FDA, 664 F.3d 940, 943 (D.C.Cir.2012). As a result, when the requisite showing has not been made, "the only function remaining to the court is that of announcing the fact and dismissing the cause." Ex parte McCardle, 7 Wall. 506, 514, 19 L.Ed. 264 (1868). Accordingly, the Court's inquiry is at an end.