Petitioner: FLORIDA ENGINEERS MANAGEMENT CORPORATION
Respondent: KISHORE TOLIA, P. E.
Judges: MARY CLARK
Agency: Department of Business and Professional Regulation
Locations: Tallahassee, Florida
Filed: May 01, 2000
Status: Closed
Settled and/or Dismissed prior to entry of RO/FO on Wednesday, August 23, 2000.
Latest Update: Jan. 10, 2025
_ . Peat e cat
STATE OF FLORIDA P i, ee OQ
FLORIDA ENGINEERS MANAGEMENT CORPORATION
FLORIDA ENGINEERS
MANAGEMENT CORPORATION,
Petitioner,
KISHORE TOLIA
py A te,
Respondent. 300...
ADMINISTRATIVE COMPLAINT
COMES NOW the Florida Engineers Management Corporation, hereinafter
referred to as “Petitioner,” and files this Administrative Complaint before the Board of
Professional Engineers against Kishore Tolia, P.E., hereinafter referred to as
“Respondent”. This Administrative Complaint is issued pursuant to Sections 120.60 and
471.038, Florida Statutes. Any proceeding concerning this complaint shall be conducted
pursuant to Section 120.57, Florida Statutes. In support of this complaint, Petitioner
alleges the following:
1. Petitioner is charged with providing administrative, investigative, and
prosecutorial services to the Board of Professional Engineers pursuant to Section
471.038(4), Florida Statutes (1997). The Board of Professional Engineers is charged
with regulating the practice of engineering pursuant to Chapter 455, Florida Statutes and
Chapter 471, Florida Statutes.
seer errey opege
ne
A a
2. Respondent is and has been at all time material hereto a licensed
professional engineer in the State of Florida, having b been issued license number PE
18092. Respondent’ s - address of record is 2265 Lee Road, , Suite # #123, Winter Park,
Florida 32789,
3. On or about June 23, 1997, Respondent signed and sealed | a cover sheet
entitled Structural Calculations, Gable End Wall ‘Bracing, Respondent's Ss calculations for
a project referred to as “the Pearl Residence” were attached.
4. Respondent structural calculations contain 1 deficiencies > including but not
limited to the following: OO .
a. The assumptions as to as built conditions were not justified by reference to
specific permit drawings or other credible evidence.
b. The critical condition at the central portion of the rear wall over the porch
was not addressed.
c. It was assumed, without justification, that the gypsum board ceiling had
been designed to provide an adequate horizontal diaphragm.
d. Due to a computational error the design wind load at the ceiling line has
been understated by 100 percent.
e. The indicated adequacy of attachments of lateral and cross bracing is not
justified.
5. Based on the foregoing, Respondent is charged with violating Section
471.033(1)(g), Florida Statutes, by engaging in fraud or deceit, negligence,
incompetence, or misconduct, in the practice of engineering.
ay
WHEREFORE, the Petitioner respectfully requests the Board of Professional
Engineers to enter an order imposing one or more of the following penalties: permanent
revocation or suspension of the Respondent's license, restriction of the Respondent's
practice, imposition of an administrative fine, ‘issuance ofa reprimand, placement of the
Respondent on probation, the assessment of costs ‘related to the investigation and
prosecution of this case, other than costs associated with an attorney’s time, as provided
for in Section 455.227(3), Florida Statutes, and/or any other relief that the Board deems
appropriate.
SIGNED this OM say of Mar , 2000.
Dennis Barton
Executive Director
Prosecuting Attorney
FILED |
Department of Business and Professional Regulation
DEPUTY CLERK
COUNSEL FOR FEMC: DATE Uy - UY - 2000
Natalie A. Lowe
Prosecuting Attorney FILED
Florida Board of Professional Engineers Foods Engineers Management Corporation
1208 Hays Street
Tallahassee, Florida 32301 CLERI
Florida Bar No. 8389 DATE -
NL/tb
PCP: March 16, 2000
Panel Members: Coby, Rebane, Seckinger
Docket for Case No: 00-001853
Issue Date |
Proceedings |
Aug. 23, 2000 |
Order Closing File issued. CASE CLOSED.
|
Aug. 21, 2000 |
Motion to Hold in Abeyance (Joint) filed.
|
Aug. 02, 2000 |
Notice of Filing Discovery Request (Petitioner) filed.
|
Jun. 08, 2000 |
Notice of Hearing (hearing set for August 29, 2000, 9:00 a.m., Tallahassee, Fl.). issued.
|
Jun. 08, 2000 |
Order of Pre-Hearing Instructions issued.
|
May 17, 2000 |
Joint Response to Initial Order filed.
|
May 08, 2000 |
Initial Order issued. |
May 01, 2000 |
Election of Rights filed.
|
May 01, 2000 |
Administrative Complaint filed.
|
May 01, 2000 |
Agency Referral Letter filed.
|