Summary: UNITED STATES OF AMERICA MERIT SYSTEMS PROTECTION BOARD 2014 MSPB 58 Docket No. PH-0752-13-5622-I-1 1 Edward Antonio Kelly, Appellant, v. Department of the Army, Agency. July 24, 2014 Edward Antonio Kelly, Laurel, Maryland, pro se. Kathleen L. Kadlec, Baltimore, Maryland, for the agency. BEFORE Susan Tsui Grundmann, Chairman Anne M. Wagner, Vice Chairman Mark A. Robbins, Member OPINION AND ORDER ¶1 The appellant petitions for review of an initial decision that affirmed the agency’s furlough acti
More
                          UNITED STATES OF AMERICA
                       MERIT SYSTEMS PROTECTION BOARD
                                       
2014 MSPB 58
                             Docket No. PH-0752-13-5622-I-1 1

                                  Edward Antonio Kelly,
                                         Appellant,
                                              v.
                                 Department of the Army,
                                           Agency.
                                        July 24, 2014


           Edward Antonio Kelly, Laurel, Maryland, pro se.

           Kathleen L. Kadlec, Baltimore, Maryland, for the agency.

                                          BEFORE

                              Susan Tsui Grundmann, Chairman
                              Anne M. Wagner, Vice Chairman
                                 Mark A. Robbins, Member



                                  OPINION AND ORDER

¶1         The appellant petitions for review of an initial decision that affirmed the
     agency’s furlough action.      For the following reasons, we conclude that the
     petitioner has not established a basis under 5 C.F.R. § 1201.115 for granting the


     1
       Pursuant to 5 C.F.R. § 1201.36(a), this appeal was part of a consolidation, ACE Balt
     Pro Se No Hearing v. Department of the Army, MSPB Docket No. PH-0752-13-5926-I-
     1. The designation “ACE Balt Pro Se No Hearing” refers to employees from the U.S.
     Army Corps of Engineers, Baltimore District, who filed furlough appeals pro se and did
     not request a hearing.
                                                                                         2

     petition for review. We therefore DENY the petition for review and AFFIRM AS
     MODIFIED by this Opinion and Order the initial decision’s analysis regarding
     the merits of the furlough and the appellant’s due process allegation, still
     affirming the agency’s furlough action.

                                       BACKGROUND
¶2         By memorandum dated June 3, 2013, the agency informed the appellant, a
     GS-12 Engineering Technician, that the U.S. Army Corps of Engineers (USACE),
     Baltimore District proposed to furlough him for no more than 11 workdays due to
     the “extraordinary and serious budgetary challenges facing the Department of
     Defense (DoD) for the remainder of Fiscal Year (FY) 2013, the most serious of
     which is the sequester that began on March 1, 2013.” Initial Appeal File (IAF),
     Tab 1 at 1, 9, 11. 2 The agency notified the appellant that the Budget Control Act
     of 2011, as amended by the American Taxpayer Relief Act of 2012, made
     across-the-board reductions to budgetary resources for the federal government,
     that DoD must and will protect wartime operations funding for its troops in
     harm’s way, that “[t]his inevitably means larger cuts in base-budget funding for
     the Operation and Maintenance (O&M) accounts,” and that DoD “will need
     funding in other accounts that can be used to provide the warfighters with what
     they need to protect national security and fight the war.” 
Id. at 9.
The agency
     afforded the appellant an opportunity to respond orally and/or in writing to the
     proposal, to review the supporting material, and to furnish affidavits or
     supporting documentary evidence in his answer. 
Id. at 10.

     2
       Under the Balanced Budget and Emergency Deficit Control Act, as amended, see
     2 U.S.C. § 901a(5)(A), Congress required the Office of Management and Budget to
     calculate and the President to order a “sequestration” on March 1, 2013, for FY 2013
     that would reduce each spending account within certain security and nonsecurity
     categories by a uniform percentage to achieve certain reduction goals. See Chandler v.
     Department of the Treasury, 120 M.S.P.R. 163, ¶ 4 (2013).
                                                                                      3

¶3         In a June 27, 2013 memorandum, the agency’s deciding official determined
     that the reasons for the proposed furlough remained valid, the procedures and
     conditions related to the furlough were determined to be the most equitable means
     of implementing the furlough, and the appellant would be required to be on a
     discontinuous furlough for no more than 11 workdays during the period from
     July 8, 2013, through September 30, 2013.       
Id. at 6.
  The record includes a
     Standard Form 50-B reflecting the appellant’s furlough, effective July 11, 2013,
     on discontinuous days between July 11, 2013, and September 30, 2013, not to
     exceed a maximum of 88 hours, with the appellant’s supervisor informing the
     appellant of the furlough dates before the beginning of each pay period. 
Id. at 11.
¶4         On appeal, the appellant asserted that: (1) although the USACE furloughed
     personnel based on their “military or civil” role to meet organizational budgetary
     goals, the USACE “could have further subdivided personnel, per the [Code of
     Federal Regulations], and then furloughed employees based on their tenure group,
     veteran[s’] preference within each group, length of service and then by
     performance”; (2) the USACE had no lapse in appropriations, the agency’s
     decision to furlough him was arbitrary, and funds existed for the work he engaged
     in; (3) the furlough decision was made at the DoD level despite the failed efforts
     of the USACE, working with the Department of the Army, to request from DoD
     exceptions to furloughs for positions with civil funding when project specific
     funding was available; (4) DoD did not approve the USACE’s request that DoD
     allow the use of accrued leave to address sequestration requirements and grant
     exceptions to furloughs where savings through reduced spending in other areas
     could be achieved; (5) the deciding official of the Baltimore District “was not
     able to overcome the dictate from DoD” and the Department of the Army, but
     simply followed the orders he was given, which means that there was no fair and
     impartial review under 5 U.S.C. chapter 75 because the deciding official could
     not make an independent judgment; (6) the agency is continuing to pay overtime
     to make up for the lost productivity due to employees out on furlough, thereby
                                                                                        4

     undermining the purpose of the furlough, which was to reduce operating costs;
     (7) the number of furlough days has been inconsistently reduced throughout the
     federal sector, thereby contradicting the original “across the board” furlough for
     all federal agencies and creating an inequitable bearing of the savings costs;
     (8) the Baltimore District Corps of Engineers has not shown what it has done to
     reduce costs in an effort to capture the 5 percent savings required for FY 2013;
     (9) the agency’s furloughs ignored the rules of tenure set forth in the Code of
     Federal Regulations, which would not have authorized a furlough of the appellant
     because he had veterans’ preference and was in tenure group 1, subgroup AD; and
     (10) the USACE relied upon a global memorandum and other supporting
     documents issued by the Secretary of Defense and other senior DoD officials,
     rather than “materials specific to the reduction in force action,” and did not
     perform an individualized analysis based on tenure to determine whether his
     furlough was necessary to promote the efficiency of the service. IAF, Tab 1 at
     4-5.
¶5          The administrative judge consolidated this appeal with several other
     appeals. See ACE Balt Pro Se No Hearing v. Department of the Army, MSPB
     Docket No. PH-0752-13-5926-I-1, Consolidation File (CF), Tabs 1-2. Based on
     the written record, because the appellants did not request a hearing, the
     administrative judge affirmed the furlough actions. 
Id., Tab 10,
Initial Decision
     (ID) at 1. The administrative judge found that the maximum number of furlough
     days served by employees of DoD was reduced to 6 workdays. ID at 2. The
     administrative judge further noted that an agency may demonstrate that a
     furlough promotes the efficiency of the service by showing that it was a
     reasonable management solution to the financial restrictions placed on it and that
     it determined which employees to furlough in a fair and even manner. ID at 3.
     Here, the administrative judge held that the agency addressed in detail, with
     citations to the record, the factual basis for the furlough actions, including how it
     determined which employees would be furloughed, asserted that the furloughs
                                                                                     5

     constituted a reasonable management solution to the impact of sequestration and
     promoted the efficiency of the service, and addressed the arguments made by the
     appellants on appeal.    ID at 3-4.   The administrative judge concluded, after
     reviewing the record and considering the appellants’ arguments, that the agency
     proved by preponderant evidence the factual basis for the furloughs and that the
     furloughs promoted the efficiency of the service. ID at 4.

                                        ANALYSIS
¶6         The appellant asserts on review all of the arguments set forth above that he
     raised in his initial appeal. Petition for Review File, Tab 1 at 4-5. The agency
     has responded in opposition to the petition for review. 
Id., Tab 5.
¶7         Under 5 C.F.R. § 351.501(a), which the appellant references on review,
     competing employees shall be classified on a retention register on the basis of
     their tenure of employment, veterans’ preference, length of service, and
     performance in descending order. Section 351.501(a), however, must be followed
     when an agency releases a competing employee from his or her competitive level
     by furlough for more than 30 days, separation, demotion, or reassignment
     requiring displacement when the release is required because of, among other
     things, a shortage of funds. See 5 C.F.R. § 351.201(a)(2). Thus, the agency was
     not required to have subdivided personnel and furloughed employees based on
     their tenure group, veterans’ preference within each group, length of service, and
     performance because there was no release of the appellant from his competitive
     level by furlough for more than 30 days. See Clerman v. Interstate Commerce
     Commission, 35 M.S.P.R. 190, 192 (1987) (although an employee can be
     subjected to a sustainable short-term furlough as an adverse action under 5 U.S.C.
     § 7512 if the agency establishes that the furlough promoted the efficiency of the
     service, the employee cannot be subjected to a sustainable long-term furlough
     under Part 351’s reduction in force procedures unless the agency establishes that
                                                                                         6

     it is also releasing all competing employees who are in a lower tenure group or
     who have a later service computation date).
¶8         The appellant makes a bare allegation on review that the USACE had no
     lapse in appropriations, the decision to furlough him was arbitrary, and funds
     existed for the type of work he performed. The appellant has shown no error,
     however, in the administrative judge’s finding that the agency proved by
     preponderant evidence the “factual basis” for the furloughs. ID at 3-4. These
     findings by the administrative judge are supported by evidence in the record.
     See, e.g., CF, Tab 9 at 15-25 (Declaration of Robert F. Hale), 28-34 (Declaration
     of Col. Luis B. Crespo), 368-70 (Declaration of Col. Joseph R. Jordan).
     Moreover, any failure on the part of the USACE to obtain additional furlough
     exemptions 3 or DoD’s approval of the use of accrued leave to address
     sequestration requirements does not establish that the agency’s action either was
     an unreasonable management solution to the financial restrictions placed on it or
     that the agency failed to apply its determination as to which employees to
     furlough in a fair and even manner. See Chandler, 120 M.S.P.R. 163, ¶ 8.
¶9         We further disagree with the appellant’s assertion that the deciding official
     simply followed the orders he was given and could not make an independent
     judgment. The deciding official provided a declaration made under penalty of
     perjury indicating that, after a careful review of each individual’s submission,
     review of the agency’s documents relied upon in issuing the proposal notice, any
     supporting documents submitted by the appellants, and the reply official’s
     recommendation, he made “an individual determination if the proposed action
     stated any basis for an exemption, and issued a decision specifying the basis for


     3
       DoD established nine categorical exceptions to furloughs of civilian workers,
     including an exception for employees who are not paid directly by accounts included in
     the DoD-Military budget, but who are funded instead by, for example, civil works
     programs. CF, Tab 7 at 30-31, 130-31.
                                                                                      7

      my determination.” CF, Tab 9 at 368-69. The deciding official indicated that he
      had “authority to individually exempt an employee if they [sic] met an
      exemption.” 
Id. at 369.
Under these circumstances, we find that the agency’s
      procedures satisfied the requirements of due process in this case. See Gajdos v.
      Department of the Army, 
2014 MSPB 55
, ¶¶ 18-25.
¶10         Regarding the appellant’s overtime allegations, guidance from the Office of
      the Secretary of Defense provides that under no circumstances may overtime be
      used to offset furloughs and that there can be no overtime on furlough days unless
      furlough relief has already been provided. CF, Tab 7 at 836. During periods
      when furloughs are in effect, overtime should be strictly limited and should not
      appear to be an attempt to offset furloughs. 
Id. Any command
that approves
      overtime must have adequate funds to pay for the overtime, even after furlough
      savings are used for readiness activities within the command or withdrawn
      through reprogramming for use by other commands. 
Id. at 836-37.
Subject to
      these limits, limited overtime may be authorized to meet mission-critical needs,
      and the appropriate deciding official must personally review overtime requests to
      ensure that they are required to meet mission-critical needs. 
Id. at 837.
¶11         A March 20, 2013 memorandum issued by the Office of the Assistant
      Secretary of the Department of the Army provides that “[e]mployee overtime
      work . . . will be prohibited during [the] sequester through the end of this FY,
      except as necessary to protect the health, safety and security of personnel or
      property; to ensure the direct and timely provision of services and material to
      deployed units or to units that are preparing to deploy; or to perform similar
      mission critical functions.” 
Id. at 355,
358. During the furlough, commanders
      may approve overtime that meets the above criteria, and any such approval must
      be documented in writing in advance of the time and date on which the work is to
      be performed, signed and dated by the approval authority, and set forth the
      purpose of the overtime work and the rationale for concluding that the work
      meets the criteria set forth above. 
Id. at 359.
                                                                                      8

¶12         An agency’s decision to award certain employees overtime pay may be
      relevant to whether the agency applied the furlough uniformly and consistently.
      Chandler, 120 M.S.P.R. 163, ¶ 14. Thus, if the agency used overtime payments
      to relieve certain employees but not others of the financial consequences of the
      furlough, this may be sufficient to show that the furlough did not meet the
      efficiency of the service standard. 
Id. The efficiency
of the service standard
      ultimately encompasses issues relating to the uniform and consistent application
      of the furlough, including whether the agency used a furlough to target employees
      for personal reasons or attempted to exempt certain employees from the furlough
      without legitimate management reasons. 
Id., ¶ 9.
The agency must treat similar
      employees similarly and must justify any deviations with legitimate management
      reasons. 
Id., ¶ 8.
¶13         Here, the appellant alleged that “the Agency is continuing to pay overtime
      to make up for the lost productivity due to employees out on furlough thereby
      undermining the purpose of an administrative furlough, which is to reduce
      operating cost. This action is in direct violation of the administrative furlough
      policy and procedure mandating cancellation of all overtime, unnecessary travel
      and implementing other cost saving measures.” IAF, Tab 1 at 4. To the extent
      that the appellant is alleging that the agency’s policy mandated the cancellation
      of all overtime, the evidence set forth above demonstrates that this assertion is
      incorrect. Moreover, we find that the agency’s decision to adopt a policy under
      which it permitted the use of overtime to meet mission-critical needs is a
      spending matter within the agency’s sound discretion.             See Chandler,
      120 M.S.P.R. 163, ¶ 14 (the agency’s alleged decision to award certain employees
      overtime “may be characterized as a spending decision as well”). Although the
      manner in which the agency implemented that overtime policy may be relevant to
      whether the agency applied the furlough uniformly and consistently, see 
id., the appellant
has not alleged in this case that the agency applied its overtime policy
      during the furlough in a manner that was not uniform and consistent.
                                                                                       9

¶14         The appellant’s contention that the number of furlough days has been
      inconsistently reduced throughout the federal sector, thereby contradicting the
      original “across the board” furlough for all federal agencies, is unavailing. The
      Board has jurisdiction over an appealable action taken by an “agency.”         See
      5 U.S.C. §§ 7513(a), (d), 7701(a). Here, the furlough action was taken by the
      USACE.     Thus, the issue is whether that particular agency proved that the
      furlough promoted the efficiency of the service by showing that the action was a
      reasonable management solution to the financial restrictions placed on it and that
      the agency applied its determination as to which employees to furlough in a fair
      and even manner, see Chandler, 120 M.S.P.R. 163, ¶ 8, not whether the
      government as a whole met that requirement. The appellant’s assertion that the
      Baltimore District Corps of Engineers has not shown what it has done to reduce
      costs in an effort to capture the 5 percent savings required for FY 2013 is
      essentially a challenge to the spending decisions of the agency, which are within
      the agency’s sound discretion. See 
id., ¶ 9.
¶15         Finally, the appellant asserts that the USACE relied upon a global
      memorandum and other supporting documents issued by the Secretary of Defense
      and other senior DoD officials, rather than “materials specific to the reduction in
      force action,” and did not perform an individualized analysis based on tenure to
      determine whether his furlough was necessary to promote the efficiency of the
      service. Under 5 U.S.C. § 7701(c)(1)(B), an action, such as the furlough in this
      case, shall be sustained only if the agency’s decision is supported by a
      preponderance of the evidence. The Board has held that an agency meets the
      efficiency of the service standard at 5 U.S.C. § 7513(a) by showing, in general,
      that the furlough was a reasonable management solution to the financial
      restrictions placed on it and that the agency applied its determination as to which
      employees to furlough in a fair and even manner. See Chandler, 120 M.S.P.R.
      163, ¶¶ 5, 8. The appellant has not identified any statute, regulation, or case law
      that requires the agency to prove its case before the Board without relying upon
                                                                                       10

      evidence from the Secretary of Defense or DoD officials, especially given that
      the Department of the Army, though separately administered by the Secretary of
      the Army, is under the direction, authority, and control of the Secretary of
      Defense. See White v. Department of the Army, 115 M.S.P.R. 664, ¶ 7 (2011).
      As set forth above, see supra ¶ 7, the appellant’s tenure plays no role in
      determining whether the furlough at issue in this case promoted the efficiency of
      the service.
¶16         Accordingly, the agency’s furlough action in this case is AFFIRMED.

                                            ORDER
¶17         This is the final decision of the Merit Systems Protection Board in this
      appeal. Title 5 of the Code of Federal Regulations, section 1201.113(c) (5 C.F.R.
      § 1201.113(c)).

                        NOTICE TO THE APPELLANT REGARDING
                           YOUR FURTHER REVIEW RIGHTS
            You have the right to request review of this final decision by the United
      States Court of Appeals for the Federal Circuit. You must submit your request to
      the court at the following address:
                                United States Court of Appeals
                                    for the Federal Circuit
                                  717 Madison Place, N.W.
                                   Washington, DC 20439

      The court must receive your request for review no later than 60 calendar days
      after the date of this order. See 5 U.S.C. § 7703(b)(1)(A) (as rev. eff. Dec. 27,
      2012). If you choose to file, be very careful to file on time. The court has held
      that normally it does not have the authority to waive this statutory deadline and
      that filings that do not comply with the deadline must be dismissed. See Pinat v.
      Office of Personnel Management, 
931 F.2d 1544
(Fed. Cir. 1991).
            If you need further information about your right to appeal this decision to
      court, you should refer to the federal law that gives you this right. It is found in
                                                                                11

Title 5 of the United States Code, section 7703 (5 U.S.C. § 7703) (as rev. eff.
Dec. 27, 2012). You may read this law as well as other sections of the United
States     Code,     at   our    website,   http://www.mspb.gov/appeals/uscode/htm.
Additional         information     is   available    at   the    court’s   website,
www.cafc.uscourts.gov. Of particular relevance is the court’s “Guide for Pro Se
Petitioners and Appellants,” which is contained within the court’s Rules of
Practice, and Forms 5, 6, and 11.
         If you are interested in securing pro bono representation for your court
appeal, you may visit our website at http://www.mspb.gov/probono for a list of
attorneys who have expressed interest in providing pro bono representation for
Merit Systems Protection Board appellants before the court. The Merit Systems
Protection Board neither endorses the services provided by any attorney nor
warrants that any attorney will accept representation in a given case.



FOR THE BOARD:


______________________________
William D. Spencer
Clerk of the Board