Elawyers Elawyers
Ohio| Change
Find Similar Cases by Filters
You can browse Case Laws by Courts, or by your need.
Find 49 similar cases
HARRY PEPPER AND ASSOCIATES, INC. vs SOUTH FLORIDA WATER MANAGEMENT DISTRICT, 05-002765BID (2005)
Division of Administrative Hearings, Florida Filed:West Palm Beach, Florida Aug. 01, 2005 Number: 05-002765BID Latest Update: Jul. 03, 2024
# 1
MONTE MCLENDON vs DEPARTMENT OF ENVIRONMENTAL REGULATION, 91-004361 (1991)
Division of Administrative Hearings, Florida Filed:West Palm Beach, Florida Jul. 12, 1991 Number: 91-004361 Latest Update: Feb. 18, 1994

Findings Of Fact The Petitioner is the owner of Lot 28, Hidden Bay Subdivision, Martin County, Florida. On July 19, 1990, Petitioner filed an application with the Respondent for a dredge and fill permit to construct on the wetland portion of his lot a single family dwelling on stilts, a garage, and a connecting driveway to an existing roadway. The application also seeks a permit to retain a roadway that was constructed on the property before the Respondent asserted jurisdiction over the property. The existing roadway is 25 feet wide and 510 feet long and remained in existence at the time of the formal hearing. The connecting driveway on the wetlands portion of the property would require 40 cubic yards of fill. The following, taken from the Notice of Permit Denial entered by Respondent, accurately describes the proposed project: The proposed project will entail the temporary placement of 500 cubit yards of clean fill in order to set piles for a proposed stilt house. Additional fill (40 cubic yards) is proposed for a driveway to access a proposed garage. Riprap is proposed along the east slope of the driveway and along the northwest slope under the proposed stilt house. In addition, 186 cubic yards of the existing unauthorized fill road is proposed to remain. Total acreage to be impacted by this project is .092 acres. Petitioner's lot fronts Bessey Creek and is located in Section 1, Township 38 South, Range 40 East, in Palm City. Petitioner's lot is located approximately 2,200 feet south of the C-23 Canal on Bessey Creek. Bessey Creek is designated a Class III water. Bessey Creek combines with other tributaries and ultimately discharges into the North Fork of the St. Lucie River, which is designated an Outstanding Florida Water. Petitioner's lot consists of 1.82 acres. Respondent has asserted jurisdiction over approximately 1.3 acres of Petitioner's lot on the grounds that it is a fresh water wetland. Petitioner does not challenge Respondent's asserted jurisdiction in this proceeding. The Respondent has jurisdiction over dredge and fill activities conducted on the portion of Petitioner's lot that is at issue in this proceeding. This project is not exempt from permitting procedures. A dredge and fill permit is required for the proposed construction. Prior to applying for this permit, Petitioner contacted James McElheny, a landscape architect, who assisted Petitioner in drawing up the plans for the house, the driveway, and the garage that Petitioner desired to construct on the property. Without being aware that a permit from the Respondent would be required, Petitioner constructed a driveway on a portion of his property that was within the permitting jurisdiction of Respondent. This driveway extended to the landward end of a boardwalk that terminated as a dock in Bessey Creek. After Petitioner became aware of the need for a permit, he removed the filled driveway to a point that Martin County and Respondent agreed was appropriate. A portion of the driveway remained on property within the permitting jurisdiction of the Respondent at the time of the formal hearing. The plan prepared by Mr. McElheny also depicted this existing, unauthorized roadway. Petitioner's application seeks, in part, a permit to retain this driveway. On June 10, 1991, Respondent issued its Notice of Permit Denial based on the Respondent's conclusion that the Petitioner had failed to provide the required assurances in Sections 403.918(1) and (2), Florida Statutes. The Notice of Permit Denial provided, in pertinent part, as follows: The Department hereby denies the permit for the following reasons: This project is expected to have both short and long term impacts to biological resources and water quality. The total acreage to be impacted by this project is .092 acres. In addition, the applicant has not provided reasonable assurance that the project is not contrary to the public interest pursuant to Section 403.918(2), Florida Statutes. Pursuant to 403.919, F.S. which gives the Department the authority to examine secondary impacts, the Department has concerns about additional wetland resource and water quality impacts that may result from this project. Floodplain areas are essential to the river system and provide important functions for the environment. The floodplain serves as a buffer system in high tide and storm events. It also serves as a source of detrital input which supports the freshwater and estuarine food chains. In addition, these areas act to improve water quality by stabilizing sediment and filtering upland runoff. Long-term effects of the proposed project would include a decrease in the productivity of the system, as well as a decrease in the filtering and stabilizing capabilities of the system. Water quality degradation is also expected to occur with upland runoff from pesticides, fertilizers, sewerage and petroleum products. Floodplain wetlands also provide a habitat for a wide variety of reptiles, amphibians, birds, crustaceans and mammals. This would eliminate this wetland habitat. This project is expected to be in violation of the following Florida Statutes and Florida Administrative Code Rules: 403.918 Criteria for granting or denying permits 17-312.080 Standards for Issuance or Denial of Permit 17-312.300(3) Mitigation Intent 17-302.560 Criteria: Class III waters The Department has determined that the following changes to the project make the project permittable. Modify the project to reduce or eliminate adverse environmental impact by: Removing the unauthorized fill road from water of the state. Relocate the proposed house to utilize as much upland area on the property as possible. Relocate the garage and access driveway to an upland area [and] eliminate or modify the garage and access road to reduce impacts. Section 403.918, Florida Statutes, provides the following permitting criteria pertinent to this proceeding: A permit may not be issued . . . unless the applicant provides the department with reasonable assurance that water quality standards will not be violated. . . . A permit may not be issued . . . unless the applicant provides the department with reasonable assurance that the project is not contrary to the public interest. . . . (a) In determining whether the project will adversely affect the public health, safety, or welfare or the property of others . . . the department shall consider and balance the following criteria: Whether the project will adversely affect the public health, safety, or welfare or the property of others. Whether the project will adversely affect the conservation of fish and wildlife, including endangered species, or their habitat; Whether the project will adversely affect navigation or the flow of water or cause harmful erosion or shoaling; Whether the project will adversely affect the fishing or recreational values or marine productivity in the vicinity of the project; Whether the project will be of a temporary or permanent nature; Whether the project will adversely affect or will enhance significant historical and archaeological resources under the provisions of s. 267.061; and The current condition and relative value of functions being performed by areas affected by the proposed activity. The Respondent is entitled to consider the cumulative impact of the proposed project pursuant to Section 403.919, Florida Statutes, which provides as follows: The department, in deciding whether to grant or deny a permit for an activity which will affect waters, shall consider: The impact of the project for which the permit is sought. The impact of projects which are existing or under construction or for which permits or jurisdictional determinations have been sought. The impact of projects which are under review, approved, or vested pursuant to s. 380.06, or other projects which may reasonably be expected to be located within the jurisdictional extent of waters, based upon land use restrictions and regulations. The residence that Petitioner proposes to build on the wetland portion of the property will be constructed on pilings so that the underside of the house will be 12 feet above the ground. There will be a total of 12 pilings, with each piling being 10 inches square. The "footprint" of the house will be 1,654 square feet. If the project is permitted, best management practice will require that a silt screen be erected around the construction site during construction to prevent silt runoff. The proposed site for the house is located in a natural clearing that would require minimal clearing. If the project is to be permitted in this wetland, the site selected by Petitioner is the best site with the least impact on the wetland. Petitioner would be required to remove up to two laurel oaks and seven red maple trees. These are relatively small trees, and both species are common. Petitioner would also be required to remove shrub of no particular unique value. Petitioner proposes to mitigate the removal of the trees by replanting on the property trees that were removed in a 2-1 ratio, so that 6 laurel oaks and 14 red maples would be replanted. Petitioner also proposes to revegetate the area beneath the residence, with the exception of the area required by the pilings. There are invasive, exotic plants on the property, such as Brazilian pepper, that would be removed by Petitioner and replaced by native plants. Ms. Jacqueline Kelly, the environmental specialist who reviewed this project for Respondent, visited the property approximately four times for a total of eight hours. Ms. Kelly is of the opinion that no dredge and fill activity should be permitted on jurisdictional wetlands. Ms. Kelly testified that she observed several species of birds while she was on the property, including a wood stork, a great blue heron, a little blue heron, a tricolored heron, an osprey, bluejays, woodpeckers, and grackles. The wood stork is an endangered species and the little blue heron, the tricolored heron, and the osprey are species of special concern. These birds do not nest on the subject property, and they were not observed in the area of the wetland on which the proposed construction would occur. There was no testimony upon which it can be concluded that the proposed construction will stop these species from coming on to the property. Because of the slope of the terrain, the upland portion of the Petitioner's property drains away from the wetland while the portion on which the proposed construction would occur drains toward the wetland. At the formal hearing, Petitioner suggested that any concerns as to drainage from the roof of the proposed residence could be discharged onto the upland portion of the lot by gutters. In his post-hearing submittal, Petitioner proposes that a condition of the permit be that "[a] roof drainage system be installed that allows the roof to drain to the upland portion of the project." The permitting requirement contained in Section 403.918(6), Florida Statutes, pertaining to historical or archaeological resources was not at issue in this proceeding. Ms. Kelly concluded that Petitioner has not provided reasonable assurances required by Section 403.918(2), Florida Statutes, as to each of the remaining permitting criteria. The rationale given by Ms. Kelly for her conclusions is not persuasive. The greater weight of the evidence is that all reasonable assurances required by Section 403.918(2), Florida Statutes, that were at issue in this proceeding have been provided as it pertains to the construction of the residence. The existing roadway was filled using shell rock which has stabilized. The mere existence of the roadway on the wetland property was not shown to violate any permitting criteria since this roadway does not violate water quality standards and is not contrary to the public interest. Petitioner did not, however, provide reasonable assurances that the utilization of this existing roadway as either a driveway or a parking area would not violate water quality standards as required by and within the meaning of Section 403.918(1), Florida Statutes, or that such use would not be contrary to the public interest or that those parts of the project would not be contrary to the public interest as required by and within the meaning of Section 403.918(2), Florida Statutes. Petitioner did not provide reasonable assurances that the construction of the garage or the extension of the driveway on these wetlands would not violate water quality standards as required by and within the meaning of Section 403.918(1), Florida Statutes, or that those parts of the project would not be contrary to the public interest as required by and within the meaning of Section 403.918(2), Florida Statutes. John Meyer was of the opinion that the project should be denied because of the possible precedent that the permitting of this project may establish for other owners of wetland properties. There was no factual or legal basis established for this opinion. The permitting of this project has no value as a precedent for other projects. There was no evidence that there were other permit applications pending for other projects in wetlands, and Mr. Meyer could only recall one or two such applications ever having been filed. The greater weight of the evidence establishes that speculative cumulative impacts of this project does not prohibit the permit pursuant to the provisions of Section 409.919(3), Florida Statutes.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that Respondent enter a Final Order which permits Petitioner to construct the residence on stilts with the following conditions: That silt screens be erected during the actual construction to prevent silt runoff from the construction from reaching Bessey Creek. That a roof drainage system be installed that allows the roof to drain to the upland portion of the project. That Petitioner be required to mitigate for the removal of laurel oaks and red maple by replanting on the property two laurel oaks for each laurel oak removed and by replanting on the property two red maples for each red maple removed. That Petitioner be required to revegetate with native plants the area under the house except for the areas required for the stilts. IT IS FURTHER RECOMMENDED that Respondent deny a permit to construct a garage or extend the existing roadway. IT IS FURTHER RECOMMENDED that Respondent permit Petitioner to retain the existing roadway on the condition that the roadway not be utilized as either a driveway or as a parking area for motor vehicles. DONE AND ENTERED this 12th day of January 1994 in Tallahassee, Leon County, Florida. CLAUDE B. ARRINGTON Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 12th day of January 1994.

Florida Laws (3) 267.061380.06409.919
# 2
TAMARAC UTILITIES, INC. vs. CENTRAL AND SOUTH FLORIDA FLOOD CONTROL DISTRICT, 76-000409 (1976)
Division of Administrative Hearings, Florida Number: 76-000409 Latest Update: Jun. 21, 1991

Findings Of Fact By application number 21312, the applicant seeks a ten year water use permit for a total annual diversion of 3,831 million gallons to provide water and sewer services to an area containing approximately 7,300 acres. In September of 1969, the Florida Public Service Commission granted the applicant certificates of convenience and necessity. The existing facilities of the applicant include nine wells and an average capacity of 700 gallons per minute each. Based upon historical data and taking into accourt the reduction of construction in the service area, the projected 1984 water demand is 375 gallons per day per unit. This is equivalent to an average of 150 gallons per day per person, using a figure of 2.5 persons per living unit. The ultimate estimated population is to be 70,000 to 80,000 people with 28,000 to 32,000 living units. Based upon the average capacities of the wells, in order to meet the projected demand a total number of 22 or 23 wells will be required. This includes the nine existing wells, eleven proposed wells with the same 700 gallon per minute average and a fifteen percent standby capability of two or three additional wells. Rather than the total number of wells utilized -- 22 or 23, -- what is important is the total gallon per minute capacity of 15,400. An allocation based on this data would be equal to the applicant's requested annual maximum diversion of 3,831 million gallons and a daily maximum diversion of 18.37 million gallons. The requested diversion presents no threat of salt water intrusion. The proposed well sites will create no adverse impact upon the Fort Lauderdale well fields. While there is evidence of recharge to the aquifer from runoff waters, there is insufficient data to determine the exact amount which will be returned. For this reason, the staff report's water budget calculations are conservative.

Recommendation Based upon the above findings of fact and conclusions of law, it is recommended that a ten year permit be issued to the applicant for a maximum annual diversion of 3,831 million gallons; a maximum daily diversion of 18.37 million gallons and a maximum installed field capacity of 15,400 gallons per minute, utilizing 22 or 23 wells with a capacity of 700 gallons per minute each. It is further recommended that the applicant be subject to the conditions set forth on page 5 of the staff report (Exhibit 8) concerning the submission of monthly reports of daily pumpage and actual connections or population served, conformance with health department standards of the water quality of all wells, and the installation and maintenance of an observation well and monthly reports of the data obtained therefrom. Respectively submitted and entered this 10th day of May, 1976, in Tallahassee, Florida. DIANE D. TREMOR Hearing Officer Division of Administrative Hearings Room 530, Carlton Building Tallahassee, Florida 32304 COPIES FURNISHED: Mr. John R. Maloy Executive Director Central and Southern Florida Flood Control District P.O. Box V West Palm Beach, Florida 33402 Mr. Edward B. Deutsch 350 Southern Federal Building 400 North State Road 7 Margate, Florida 33063 Mr. John Wheeler P.O. Box V West Palm Beach, Florida 33402 Attorney for the Central and Southern Florida Flood Control District

# 3
POSEIDON MINES, INC. vs. SOUTHWEST FLORIDA REGIONAL PLANNING COUNCIL, 75-002092 (1975)
Division of Administrative Hearings, Florida Number: 75-002092 Latest Update: Mar. 21, 1977

The Issue Whether a consumptive use permit for the quantities of water requested in the application should be granted.

Findings Of Fact Application 7500137 seeks an average daily withdrawal of 2.4 million gallons of water with maximum daily withdrawal not more than 2.88 million gallons from an existing well in order to process phosphate and reclaim land. This is an existing use for mining operations located southwest of Lakeland, Florida, on land consisting of 1531 acres. Notice was published in a newspaper of general circulation, to wit: The Lakeland Ledger, on November 11 & 18, 1975, pursuant to Section 373.146, Florida Statutes. The application and affidavit of publication were admitted into evidence without objection as Composite Exhibit 1, together with correspondence from James R. Brown, Vice President, Dagus Engineers, Inc., dated November 19, 1975 to the Southwest Florida Water Management District. No objections were received by the Water Management District as to the application. Mr. George Szell, hydrologist of the Water Management District testified that the application met the conditions for a consumptive use permit as set forth in Chapter 16J-2.11, Florida Administrative Code, except that the quantity of water requested to be withdrawn is 41.06 per cent over the maximum average daily withdrawal permitted under the water crop theory as set forth in Section 16J-2.11(3), F.A.C. However, the Water Management District witness recommended waiver of that provision since the mining operations will be concluded in several years and thereafter the water table and hydrologic conditions will return to normal. The Water District staff recommended approval of the application with the condition that a meter be installed on the well and that the applicant be required to take monthly readings thereof and submit quarterly reports of the readings to the District. The applicant's representative agreed to these conditions at the hearing.

Recommendation It is recommended that Application No. 7500137 submitted by Poseidon Mines, Inc., for a consumptive water use permit be granted on the condition that a meter be installed on the applicant's well and that monthly readings be taken and submitted quarterly by the applicant to the Southwest Florida Water Management District. It is further recommended that the Board of Governors of the Southwest Florida Water Management District, pursuant to Rule 16J-2.11(5), for good cause, grant an exception to the provisions of Rule 16J-2.11(3), as being consistent with the public interest. DONE and ENTERED this 19th day of January, 1976, in Tallahassee, Florida. THOMAS C. OLDHAM Division of Administrative Hearings Room 530, Carlton Building Tallahassee, Florida 32304 (904) 488-9675 COPIES FURNISHED: J.T. Ahern, Staff Attorney Southwest Florida Water Management District P.O. Box 457 Brooksville, Florida 33512 Poseidon Mines, Inc. P.O. Box 5172 Bartow, Florida

Florida Laws (1) 373.146
# 4
JAMES SARTORI, D/B/A WILLOWBROOK FARMS vs. ST. JOHNS RIVER WATER MANAGEMENT DISTRICT, 81-002393RX (1981)
Division of Administrative Hearings, Florida Number: 81-002393RX Latest Update: Nov. 24, 1981

Findings Of Fact On December 31, 1976, Respondent's territorial jurisdiction was expanded by transfer of substantial areas formerly regulated by other water management districts. The transfer was effected pursuant to legislative revision of Section 373.069, F.S., which delineates the geographic boundaries of Florida's water management districts. The following rule promulgated by Respondent became effective on January 31, 1977, and was amended on February 3, 1981: 40C-4.031 (previously 16I-4.04, Florida Administrative Code). Implementation. These regulations shall become effective February 1, 1981, throughout the District and will be implemented in those areas transferred to the St. Johns River Water Management District from the Central & Southern Florida Flood Control District and the Southwest Florida Water Management District on the same date. Implementation in other areas will be effected pursuant to public hearing at subsequent dates determined by the Board. The regulations implemented by the above rule establish permitting procedures for projects which involve holding, diversion, or discharge of significant quantities of water. However, permits are required only in the transferred territory. Petitioner owns 11,500 acres located within the territory where permits are required. Petitioner seeks to improve his property for agricultural purposes, which involves the holding and diversion of surface waters. He has accepted Respondent's determination that his property is within the permitting area and has filed the requisite application. However, Petitioner contends that he is unable reasonably to confirm Respondent's determination that his property is situated in the regulated territory. Respondent demonstrated that a determination can be made by comparing the statutory descriptions of Respondent's jurisdiction prior to and after the transfer, and has maps available which reflect the permitting area. To accomplish this task independently requires knowledge of legal territorial descriptions (section, township, range) and a laborious comparison of legal descriptions set out in the 1975 and 1977 versions of the Florida Statutes. At the time reorganization of the water management districts became effective (December 31, 1976) , Respondent had limited regulatory capability. Its decision to implement permitting only in the transferred territory was based on this limited capability and the need to preserve continuity 1/ in areas where permits had previously been required. In the years following this decision, Respondent has continued to require permits only in those areas transferred in 1976. The evidence established that the boundary between the regulated and unregulated areas is one of convenience and has no hydrological or other scientific basis. Respondent is considering a revision of its rules to become effective sometime in 1982. This revision may enlarge the permitting territory and modify the criteria for grant or denial of permits. Petitioner asserts that his application is being evaluated by rules not yet adopted and fears that new standards may be applied after hearing on the application, which is now under consideration pursuant to Subsection 120.57(1), F.S., (DOAH Case No. 81-1588). Hearing is scheduled for December, 1981. In support of this contention, Petitioner points to the technical staff report prepared in May, 1981, which recommends denial of the application giving, among others, the following reasons: Volumes 1 and 2 of Phase 1 of the Upper Basin Plan catalogue a history of a diminish- ing water resource in the upper basin. The water resources in the upper basin have been harmed and the proposed project aggravates the existing harm to the resource. Moreover the proposed project is inconsistent with the overall objectives of the district for the upper basin. Resolutions 75-11 and 81-2, the 1977 Management Plan, and Volumes 1 and 2 of Phase I of the Upper Basin Plan indicate that the objectives of the District are to curtail inter-basin diversion and maintain and enhance, if possible, the existing hydro- logic regime in the upper basin. The pro- posed project is not in conformance with either of these statutory requirements. (Emphasis added.) An earlier technical staff report prepared in November, 1980, recommended grant of the application, with some modification. This report did not refer to inter-basin diversion.

Florida Laws (7) 120.52120.54120.56120.57373.069373.113373.413 Florida Administrative Code (2) 40C-4.03140C-4.301
# 5
EAST BEACH WATER CONTROL DISTRICT, SOUTH SHORE DRAINAGE DISTRICT, EAST SHORE WATER CONTROL DISTRICT, AND SOUTH FLORIDA CONSERVANCY vs DEPARTMENT OF ENVIRONMENTAL REGULATION, 93-001479RU (1993)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Mar. 12, 1993 Number: 93-001479RU Latest Update: Jan. 17, 1995

Findings Of Fact The petitioners Petitioners are special taxing districts and political subdivisions of the State of Florida, which were created pursuant to Chapter 298, Florida Statutes. The petitioners and their pertinent structures and operations were authorized by Chapter 298, Florida Statutes, for the purpose of providing irrigation, drainage and flood protection for the landowners within their respective boundaries. In order to effect this purpose, the petitioners designed and operate their water control structures to pump excess stormwater and surface water directly to Lake Okeechobee (the "Lake") in the case of East Beach Water Control District (East Beach) and directly to the Rim Canal at the southern end of the Lake in the case of South Shore Drainage District (South Shore), East Shore Water Control District (East Shore), and South Florida Conservancy District (South Florida). East Beach covers a total area of approximately 6,542 acres located along the southeast shore of the Lake. Approximately 75-80 percent of the lands contained within the District are used for agriculture, with most of those lands planted in sugarcane. The remaining 20-25 percent of the drainage area is urbanized. The urban area includes the City of Pahokee. South Shore covers a total area of approximately 4,230 acres located along the Rim Canal at the south end of the Lake. Approximately 80-85 percent of the lands contained within the District are used for agriculture, with most of those lands planted in sugarcane. The remaining 15-20 percent of the drainage area is urban and industrial. The urban area includes a portion of the cities in South Bay, Lake Harbor, Bean City, South Shore Village, and sparsely scattered home sites throughout the District. East Shore covers a total area of approximately 8,136 acres located along the Rim Canal at the south end of the Lake. With the exception of lands developed as canals, levees, roads, and other service-related systems, the entire district is used for agricultural purposes. South Florida covers a total area of approximately 32,754 acres located along the Rim Canal at the south end of the Lake with 28,649 acres located in Palm Beach County and 4,105 acres located in Hendry County. Approximately 85-90 percent of the land is used for agricultural purposes and the remaining 10-15 percent is used for urban or industrial purposes. The City of Belle Glade constitutes a major part of the urban land with the remainder situated around the cities of South Bay, Lake Harbor and other scattered home sites. Here, the parties have stipulated that petitioners have standing to maintain this challenge. Background Before 1986, petitioners' discharges into the Lake had not been regulated by the respondent, Department of Environmental Regulation (Department). In 1985 the Governor of the State of Florida issued Executive Order Number 86-150. This executive order observed that the Lake Okeechobee Technical Committee, formed to study water quality and water supply conditions in the Lake, had found the Lake to be in danger of becoming hypereutrophic because of the excessive amounts of nutrients, especially phosphorus, it was receiving, and had recommended corrective actions to substantially reduce the nutrient load and provide for long-term monitoring, research and management needs for the Lake. To protect and preserve the Lake, the executive order directed, inter alia, that the Department "bring all private and publically controlled backpumping sources into the lake under permit review or under enforcement for operating without a permit." Pursuant to that executive order, the Department, in concert with petitioners, began the process of regulating petitioners' discharges into the Lake. The Department initially attempted to have the petitioners enter into consent orders; however, the petitioners objected to that concept. Ultimately, both the Department and petitioners agreed to the issuance of short-term operating permits (TOPs) containing specific conditions aimed at determining the composition of the discharges from petitioners' systems and at reducing the pollution loading into the Lake. The TOPs, issued December 30, 1986, and effective until September 23, 1988, were issued pursuant to the Department's regulatory authority over pollution sources contained in Chapter 403, Florida Statutes, and Rule 17-4, Florida Administrative Code. 2/ Pertinent to this case, Section 403.088, Florida Statutes, provided, and continues to provide, as follows: 403.088 Water pollution operation permits; temporary permits; conditions-- (1) No person, without written authorization of the department, shall discharge into waters within the state any waste which by itself or in combination with the wastes or other sources, reduces the quality of the receiving waters below the classification established for them . . . (2)(a) Any person intending to discharge wastes into the waters of the state shall make application to the department for an operation permit. Application shall be made on a form prescribed by the department and shall contain such information as the department requires. If the department finds that the proposed discharge will reduce the quality of the receiving waters below the classification established for them, it shall deny the application and refuse to issue a permit. . . (3)(a) A person who does not qualify for an operation permit or has been denied an operation permit under paragraph (b) of subsection (2) may apply to the department for a temporary operation permit . . . After consideration of the application, any additional information furnished, and all written objections submitted, the department shall grant or deny a temporary operation permit. No temporary permit shall be granted by the department unless it affirmatively finds: The proposed discharge does not qualify for an operation permit; The applicant is constructing, installing, or placing into operation, or has submitted plans and reasonable schedules of constructing, installing or placing into operation, an approved pollution abatement facility or alternate waste disposal system, or that the applicant has a waste for which no feasible and acceptable method of treatment or disposal is known or recognized but is making a bona fide effort through research and other means to discover and implement such a method; The applicant needs permission to pollute the waters within the state for a period of time necessary to complete research, planning, construction, installation, or operation of an approved and acceptable pollution abatement facility or alternate waste disposal system; There is no present, reasonable, alternative means of disposing of the waste other than by discharging it into the waters of the state; The denial of a temporary operation permit would work an extreme hardship upon the applicant; The granting of a temporary operation permit will be in the public interest; or The discharge will not be unreasonably destructive to the quality of the receiving waters. A temporary operation permit issued shall: Specify the manner, nature, volume, and frequency of the discharge permitted; Require the proper operation and maintenance of any interim or temporary pollution abatement facility or system required by the department as a condition of the permit; Require the permitholder to maintain such monitoring equipment and make and file such records and reports as the department deems necessary to ensure compliance with the terms of the permit and to evaluate the effect of the discharge upon the receiving waters; Be valid only for the period of time necessary for the permit holder to place into operation the facility, system, or method contemplated in his application as determined by the department; and Contain other requirements and restrictions which the department deems necessary and desirable to protect the quality of the receiving waters and promote the public interest. And, Section 403.927, Florida Statutes, provided, and continues to provide, as follows: 403.927 Use of water in farming and forestry activities.-- . . . it is the intent of the Legislature to provide for the construction and operation of agricultural water management systems under authority granted to water management districts and to control, by the department or by delegation of authority to water management districts, the ultimate discharge from agricultural water management systems. . . . The department may require a stormwater permit or appropriate discharge permit at the ultimate point of discharge from an agricultural water management system or a group of connected agricultural water management systems. . . (4) As used in this section, the term: * * * (b) "Agricultural water management systems" means farming and forestry water management or irrigation systems and farm ponds which are permitted pursuant to chapter 373 or which are exempt from the permitting provisions of that chapter. The agricultural water management systems owned and operated by petitioners fall within the definition of "agricultural water management systems" set forth in Section 403.927(4)(b), Florida Statutes. Consistent with the provisions of Section 403.088, Florida Statutes, Rule 17-4.070(1), Florida Administrative Code, provides: A permit shall be issued to the applicant upon such conditions as the Department may direct, only if the applicant affirmatively provides the Department with reasonable assurance based on plans, test results, installation of pollution control equipment, or other information, that the construction, expansion, modification, operation, or activity of the installation will not discharge, emit or cause pollution in contravention of Department standards or rules. However, for discharges of wastes to water, the Department may issue temporary operation permits under the criteria set forth in Section 403.088(3), F.S. Chapter 17-4, Florida Administrative Code, further delineates the specific procedures to obtain permits and the specific standards for issuing and denying permits. In July 1988, petitioners applied for an extension of their TOPs. The monthly water quality monitoring data petitioners had submitted to the Department reflected, however, that the discharges from petitioners' systems were in contravention of the Department's rules and standards. Accordingly, since petitioners had not met the obligations set forth in the TOPs, the Department advised petitioners that the TOPs would not be extended and that they were required to apply for new operating permits. The new permit applications Following the Department's refusal to extend the TOPs, petitioners filed applications for operating permits for their discharges, and the Department, consistent with its previous reviews, undertook its review pursuant to Chapter 403, Florida Statutes, and Chapter 17-4, Florida Administrative Code. Effective July 1, 1989, however, Part IV of Chapter 373, Florida Statutes, was amended with regard to, inter alia, the definition of stormwater management systems so as to include pumped discharges such as petitioners. Further, pertinent to this case, Part IV of Chapter 373 provided: 373.416 Permits for maintenance or operation-- (1) . . . the governing board or department may require such permits and impose such reasonable conditions as are necessary to assure that the operation or maintenance of any stormwater management system, dam, impoundment, reservoir, appurtenant work, or works will comply with the provisions of this part and applicable rules promulgated thereto, will not be inconsistent with the overall objectives of the district, and will not be harmful to the water resources of the district. 373.418 Rulemaking; preservation of existing authority.-- It is the intent of the Legislature that stormwater management systems be regulated under this part incorporating all of existing requirements contained in or adopted pursuant to chapters 373 and 403. Neither the department nor governing boards are limited or prohibited from amending any regulatory requirement applicable to stormwater management systems in accordance with the provisions of this part. It is further the intent of the Legislature that all current exemptions under chapters 373 and 403 shall remain in full force and effect and that this act shall not be construed to remove or alter these exemptions. In order to preserve existing requirements, all rules of the department or governing boards existing on July 1, 1989, . . . shall be applicable to stormwater management systems and continue in full force and effect unless amended or replaced by future rulemaking in accordance with this part. Upon the amendment of Part IV, Chapter 373, Florida Statutes, petitioners amended their pending applications to reflect their desire that the applications be processed pursuant to the newly amended provisions of Part IV, Chapter 373, as they relate to stormwater management systems. The Department, acknowledging the amendments to chapter 373, processed the applications accordingly; however, in view of the provisions of section 373.418(1) which "incorporat[ed] all of the existing requirements contained in or adopted pursuant to chapters 373 and 403," the Department did not in fact change the standards by which these applications were reviewed, to wit: Chapter 403, Florida Statutes, and Chapter 17-4, Florida Administrative Code. On March 14, 1991, the Department issued a notice of permit denial to each petitioner. In each of the denials, the Department noted the provisions of Section 373.416(1), Florida Statutes, ["the . . . department may require such permits and impose such reasonable conditions as are necessary to assure that the operation . . . of any stormwater system . . . will comply with the provisions of this part and applicable rules promulgated thereto . . . and will not be harmful to the water resources of the district"] and Section 373.418(1), Florida Statutes, ["incorporating all of existing requirements contained in or adopted pursuant to chapters 373 and 403"], and concluded that the applications should be denied for the following reasons: The Department has completed its review of the subject application, supporting documents and the discharge monitoring reports submitted by the applicant as required by Department Permit NO. IT50- 125678. Based on this review the Department has made the determination that the applicant has failed to provide reasonable assurances that the discharge from the agricultural stormwater management system proposed by the applicant will be in compliance with the aforementioned sections of Chapter 373, F.S. and the Class I Surface Water Quality Standards adopted by the Department pursuant to Chapter 403.061, F.S. and contained in Section 17-302.540, F.A.C. and the Antidegradation Policy for Surface Water Quality contained in Section 17-302.300(3), F.A.C. The Department's action is facially consistent with the provisions of chapter 373, and chapter 403 incorporated therein, as well as the existing rules adopted pursuant to such chapters which require, whether the system be exempt or not, that discharges comply with state water quality standards. See e.g., Sections 373.416, 373.418, 403.088 and 403.927, Florida Statutes, and Rules 17- 4.070(1), 17-25.060, 17-25.080, and Chapter 40E-4, Florida Administrative Code. Availing themselves of the point of entry accorded by the notice of permit denial, petitioners filed a request for administrative hearing, pursuant to Section 120.57, Florida Statutes, to contest the denial of their applications. Such proceedings are currently pending before the Division of Administrative Hearings, but distinct from this proceeding under Section 120.535, Florida Statutes. The Section 120.535 challenge The challenged policy, as alleged in paragraphs 19 of the petition, purports to be as follows: The Department has made a policy determination, which draws a distinction between "agricultural stormwater discharges" and other stormwater discharges regulated by Chapter 373, Florida Statutes, and the rules promulgated pursuant thereto. The Department has identified the Petitioners' discharge as "agricultural stormwater discharges" and has subjected the petitioners to a set of rules and criteria that the Department has not adopted but which are apparently different from the general stormwater regulations adopted pursuant to Chapter 373, Florida Statutes. Such articulation of the challenged policy is substantially identical to petitioner's statement of the issue identified in their proposed final order, as follows: The issue for determination in this case is whether the Department's policy to apply criteria different from that contained in its "Regulation of Stormwater Discharge" Rule 17-25, Florida Administrative Code, and/or Rule 40E-4, Florida Administrative Code, of the South Florida Water Management District (SFWMD), when seeking to regulate an agricultural stormwater management system, as defined in Chapter 373, Part IV, Florida Statutes, constitutes a rule . . . . The premises for the petitioners' challenge are their contention that the Department has drawn a distinction between the agricultural stormwater discharges of petitioners and other stormwater discharges, which is not supported by statutory or duly promulgated rules, and that the Department has applied criteria, which are not supported by statutory or duly promulgated rules, to evaluate petitioners' applications. The credible proof fails, however, to support petitioners' premises. Contrary to the assertions raised by petitioners, the statutory and duly promulgated rules heretofore discussed provide ample authority for the Department's action, and there is no credible proof that the Department is applying any criteria that is not apparent from an application or reading of such statutes and existing rules. Indeed, Rule 17-25.060(2), Florida Administrative Code, provides: The permit requirements of Chapter 17-4 or other applicable rules, rather than those of this chapter, shall apply to discharges which are a combination of stormwater and industrial or domestic wastewater or which are otherwise contaminated by non-stormwater sources unless: (a) the stormwater discharge facility is capable of providing treatment of the non- stormwater component sufficient to meet state water quality standards . . . . Here, the proof is compelling that the Department's decision was predicated on existing statutory and rule authority, and that it did not apply any criteria not promulgated as a rule or not contained within existing statutory authority to evaluate petitioners' applications, or treat petitioners' discharges differently than any other stormwater discharge contaminated by non-stormwater sources.

Florida Laws (9) 120.52120.54120.57120.68373.416373.418403.061403.088403.927
# 6
ED W. WORTHINGTON vs. CENTRAL AND SOUTH FLORIDA FLOOD CONTROL DISTRICT, 75-001633 (1975)
Division of Administrative Hearings, Florida Number: 75-001633 Latest Update: Mar. 21, 1977

Findings Of Fact Application No. 24457 requests the annual diversion, by means of the installation of two wells approximately 8 inches in diameter and 40 feet deep, of 940 acre-feet of ground water for supplemental irrigation of two parcels of land totaling 500 acres. This land is used for growing hay. Received into evidence without objection were the notice of public hearing appearing in The Palm Beach Post, West Palm Beach, Florida, the application in question and the Staff Report of the Central and Southern Florida Flood Control District (FCD), prepared by Bruce L. Cutright with the Hydrology Division of the FCD. The Staff Report, attached hereto, recommended the approval of the application for 600 acre-feet per year subject to certain conditions. At the beginning of the hearing, Mr. Worthington, the applicant, stipulated to the Staff Report and did not present any evidence on his own behalf. Mr. Bruce Cutright was called as a witness by the FCD and testified that he prepared the Staff Report and testified as to its contents. Mr. Cutright reviewed the subject application and determined that agricultural production and irrigation is a reasonable and beneficial use. In determining the actual annual water requirements needed, Mr. Cutright compared three numbers and selected the smallest of the three as the allocable amount. The three compared were the amount requested by the applicant, the FCD's estimate of the amount of recharge entering the shallow aquifer on the applicant's property, and the supplemental crop requirement for hay. It was determined that the water crop for the 500 acres in question is 14.4 inches, or 600 acre-feet or 195.5 million gallons per year. It was recommended that the maximum monthly withdrawal be 211.5 acre-feet or 68.9 million gallons. This amount was based upon the crop requirement during the driest month of a 2 in 10 year drought, assuming an 80 percent irrigation efficiency. The recommendations further included a maximum installed capacity of two wells with a combined capability of 3,500 gpm, with the applicant to submit well completion reports and detailed information on each well immediately upon completion; monthly records of pumpage to the FCD once a year at the end of each irrigation season and that the permit expire on October 15, 1978.

Recommendation Based upon the above findings of fact and conclusions of law, it is recommended that Application No. 24457 be granted and that a permit be issued in accordance with the recommendations set forth in the Staff Report, attached hereto. Respectfully submitted this 7th day of October, 1975, in Tallahassee, Florida. DIANE D. TREMOR Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 7th day of October, 1975. COPIES FURNISHED: John Wheeler, Esquire Attorney for the Central and Southern Florida Flood Control District Post Office Box V West Palm Beach, Florida Mr. Ed W. Worthington Route 3, Box 239A Lake Worth, Florida 33460

# 7
JOSEPH BELANGER, PATRICIA BELANGER, JEROME STRAUSS, AND SUSAN STRAUSS vs CONQUEST DEVELOPMENTS USA L.C., AND SOUTH FLORIDA WATER MANAGEMENT DISTRICT, 02-000116 (2002)
Division of Administrative Hearings, Florida Filed:Naples, Florida Jan. 09, 2002 Number: 02-000116 Latest Update: Sep. 30, 2002

The Issue The issue is whether an Environmental Resource Permit should be issued to Conquest Developments USA, L.C., authorizing the modification of an existing stormwater management system serving a residential development known as Silver Lakes in Collier County, Florida.

Findings Of Fact Based upon all of the evidence, the following findings of fact are determined: Background In this environmental permitting dispute, Respondent, South Florida Water Management District (District), proposes to issue an Environmental Resource Permit (ERP) to Respondent, Conquest Developments USA, L.C. (Applicant), authorizing the modification of an existing stormwater management system serving a private, gated residential community known as Silver Lakes RV and Golf Club, Inc. (Silver Lakes) in unincorporated Collier County, Florida. As the agency responsible for the administration of the ERP program, the District has the authority to grant or deny the requested permit. Preliminary action approving the application was taken by the District on August 15, 2001. Silver Lakes is a 146-acre residential development located adjacent to, and on the east side of, County Road 951 approximately 1.5 miles south of the intersection of U.S. Highway 41 and County Road 951 in southwestern Collier County, Florida. The project site is a part of the larger development and consists of approximately forty undeveloped acres (40-acre site) just north of, and adjacent to, the residential community. If the application is approved, the Applicant would be allowed to construct an open storage facility on a 7.02-acre tract of land in the western part of the 40-acre site on which trailers, boats, motor homes, tow dollies, and similar items will be stored. It would also allow the Applicant to relocate previously permitted lots along the southeastern boundary of the 40-acre site which border the Silver Lakes development. Petitioners, Jerome and Susan Strauss, own Lots 14, 15, and 16 within Silver Lakes. Petitioners, Joseph H. and Patricia Belanger, own Lot 26 within Silver Lakes, which is adjacent to the proposed storage facility. For obvious reasons, the Belangers do not wish to have a storage facility next to their property. Rather, they and the other Petitioners have suggested that the storage facility be reduced in size and moved to a 3.0-acre site in the northeastern portion of the 40-acre site. The parties have stipulated that Petitioners have standing to bring this action. As reflected in the parties' Prehearing Stipulation, Petitioners contend that the proposed construction of the storage area will cause flooding, adverse secondary impacts, and adverse water quantity impacts; that the proposed activity will result in a violation of state water quality standards; that the proposed system will cause adverse impacts to surface water storage and conveyance capabilities, the value of functions provided to fish and wildlife and listed species by wetlands and other surface waters, and the conservation of fish and wildlife; that the Applicant has failed to minimize or avoid impact to jurisdictional wetlands to the greatest extent practicable; that the proposed site provides a wildlife corridor connected to protected lands directly to the west; that the proposed site is jurisdictional wetlands; that the Applicant has engaged in District activities without a permit; and that the proposed site is subject to a Declaration of Covenants, Conditions, and Restrictions. These objections, where relevant, have been grouped into five categories - wetlands, wildlife, secondary and cumulative impacts, water quality and quantity, and prior enforcement activities - and they are addressed separately below. Wetlands The District has adopted and incorporated by reference in Rule 40E-4.091(1)(a), Florida Administrative Code, a document known as the Basis of Review for Environmental Resource Permit Applications Within the South Florida Water Management District (Basis of Review). The standards and criteria found in the Basis of Review are used to determine whether an applicant has given reasonable assurances that the conditions for issuance of an ERP have been satisfied. Compliance with the criteria in the Basis of Review creates a presumption that the standard and additional conditions for issuance of an ERP in Rules 40E-4.301 and 40E- 4.302, Florida Administrative Code, respectively, have been met. See Section 1.3, Basis of Review. Section 4.2.1 of the Basis of Review generally requires that an applicant provide reasonable assurances that wetland impacts be eliminated or reduced to the greatest extent practicable. This can be done through the implementation of "practicable design modifications" to the project, or where adverse impacts still remain after such modifications, through mitigation. There are 36.82 acres of wetlands throughout the 40- acre site. If the application is approved, there will be adverse impacts to 9.9 acres of wetlands in the western portion of the site (where the storage facility will be located) and to 3.37 acres in the southeastern portion of the site. To avoid and minimize wetland impacts, the Applicant has been required to reduce the number of acres impacted from its original proposal, and to place the storage area on the western part of the 40-acre site near County Road 951. In the original application, the Applicant proposed to place the storage area in the eastern part of the site and to create a larger storage area. Although the western part of the 40-acre site contains higher quality wetlands than the central or eastern parts, the western area is not pristine, and it is substantially impacted by exotic species, such as wax myrtle and Brazilian pepper. In addition, the western area is adjacent to County Road 951, which reduces wetland functions and values, reduces habitat values because of increased light and noise encroachment, and increases risk to wildlife because of passing vehicles. Further, the central and eastern areas are adjacent to other undeveloped lands, and this creates the potential for larger tracts of preserved and enhanced wetlands and maximizes wetland functions and values. Impacts to wetlands will be adequately mitigated by the Applicant preserving and enhancing 26.92 acres within the 40-acre site in a recorded conservation easement; by monitoring and reporting on the on-site mitigation (easement) for a five-year period and by maintaining the property in perpetuity; by purchasing 3.66 mitigation credits of similar wetland habitat from the Panther Island Mitigation Bank; and by adhering to a remediation plan (found in the Special Conditions in the permit) to address any future deficiencies in the mitigation. Given these considerations, it is found that the Applicant has provided reasonable assurances that the wetland impacts from the proposed activities will be eliminated or reduced as required by Section 4.2.1 of the Basis of Review. Impact on Wildlife Section 4.2.2 of the Basis of Review requires an applicant to provide reasonable assurances that the activity will not impact the values of wetlands and other surface water functions so as to cause adverse impacts to the abundance, diversity, or habitat of fish, wildlife, and listed species. The primary agency responsible for the protection of wildlife is the Florida Fish and Wildlife Conservation Commission (Commission), and not the District. Therefore, Section 4.2.2 of the Basis of Review requires that the District provide the Commission with a copy of all ERP applications for its review and comment as to wildlife issues. In this case, the Commission offered no comments or objections regarding wildlife on the property in question. The evidence shows that listed and endangered species such as Florida panthers, wood storks, and Big Cypress fox squirrels have been spotted on infrequent occasions on the 40-acre site by residents of Silver Lake. However, the parties stipulated that there was no evidence of any nesting, denning, or breeding activity on the same site. Based on the evidence of record, including the Applicant's Protected Species Survey, it is fair to infer that there is limited or no use of the property by protected wildlife species. Indeed, Petitioners' own expert found no evidence of endangered or threatened species on the 40-acre site during his two inspections. Two Special Conditions have been incorporated into the permit to protect endangered, threatened, or other listed species. First, in the event that Big Cypress fox squirrels are observed on or near the property, Special Condition 24 requires that the Applicant prepare a habitat management plan, in consultation with the Commission, to address issues related to nesting habitat. Second, if any endangered or threatened species are ever found on the property, Special Condition 25 requires that the Applicant coordinate with the Commission or the U.S. Fish and Wildlife Commission for guidance or recommendations. Given the above, the evidence supports a finding that the Applicant has given reasonable assurances that the requirements of Section 4.2.2 of the Basis of Review have been satisfied. Secondary and Cumulative Impacts Section 4.2.7 of the Basis of Review requires that an applicant provide reasonable assurances that the proposed activity will not cause adverse secondary impacts to the water resources. At the same time, Section 4.2.8 requires that an applicant provide reasonable assurances that a regulated activity will not cause unacceptable cumulative impacts to wetlands and other surface waters within the same drainage basin as the regulated activity for which the permit is being sought. In providing the necessary reasonable assurances regarding cumulative impacts, Section 4.2.8.2 authorizes an applicant to use preservation and mitigation measures to prevent cumulative impacts. The more persuasive evidence shows that the project will not cause secondary impacts to wetlands. This is because a water quality berm system surrounds the wetlands, isolating the wetland system from the surface water management system; a 50-foot preserved area lies between the storage area and the adjacent property boundary to the north; the storage area is being placed in an area already secondarily impacted by County Road 951; and the wetland preservation area will be placed in the conservation easement. Further, the project will not cause secondary impacts to wildlife. This is because structural buffers will prevent future encroachment into the wetlands and distance any wildlife away from the more dense residential functions. These buffers include a 50-foot wide natural preserve on the north side of the storage area (Special Condition 26), an already-erected structural buffer to the south of the storage area (Special Condition 26), and a 17 to 21-foot structural buffer (planted with native vegetation or vegetated buffers) on the eastern side of the 40-acre site where the new lots are proposed. Except for two conclusionary opinion statements by Petitioners' expert, without further facts or explanation, no other evidence on secondary impacts was offered. The project will not cause cumulative impacts to the wetlands. This is because the proposed mitigation for the project adequately offsets the impacts of the 40-acre site, and the impacts from other permitted projects in the basin area have been sufficiently offset. In addition, very little property in the area remains to be developed, and there are no new applications before the District involving the same basin. In the event a new application may be filed, however, the District will require the applicant to offset any impacts associated with its project with buffers and conservation easements, like the Applicant in the instant case. Water Quantity and Quality Section 5.0 et. seq. of the Basis of Review contains water quality criteria that must be satisfied in order for an ERP to be issued, while Section 6.0 et. seq. addresses water quantity criteria for an ERP. Given the limited nature of changes to the existing system and the lack of a hydrologic connection to the wetlands, and for the following additional reasons, the Applicant has given reasonable assurances that the project complies with the water quality and quantity criteria. The project as designed includes a grass swale near the storage area on the western part of the 40-acre site. The rainfall and run-off from the storage area flows into an internal road, through the grass swale, into a storm drain, and then into the pre-existing water management system associated with the original permit for Silver Lake. The project also allows rainfall and run-off from the proposed lots on the southeastern border of the 40-acre site to sheetflow onto an internal road, where waters are collected in existing catch basins and conveyed into the previously permitted water management system associated with the original permit. Since the rainfall and run-off from the storage area and lots drain into the existing lakes (Lakes 1 and 2) that are part of the Silver Lakes water management system, those waters will be treated for water quality through wet detention before their eventual discharge to McIlvane Bay, which lies to the southwest of Silver Lake. The basin discharge rates, minimum floor elevations, road designs, parking lot designs, structure control elevations, and structure sizes are specified in the the District's Staff Report, and were set at or above the calculated design limitations to meet water quality and quantity requirements. Section 5.2.1(a)1. of the Basis of Review specifies that wet detention volume shall be provided for the first inch of runoff from the developed project. The evidence shows that the proposed system captures one inch of run-off over the entire site, which drains into the existing lake system to provide water quality treatment. The system is also designed to meet the relevant discharge rate requirements for a 25-year, 3-day storm event, and the minimum floor elevations were based on a 100-year, 3- day storm event. The wetland preserve area is outside the area served by the surface water management system, is not hydrologically connected to that system, and will not be affected by run-off from the storage area or lots. Just prior to the final hearing, the District added Special Condition 23 to create a 50-foot buffer zone along the southern boundary of the storage area for aesthetic purposes and to reduce secondary impacts. Implementation of that buffer must be in accordance with the staff report, will not change the surface water management system, will have no impact on water quality or flood control, and will be implemented after additional consultation with the District. Past Enforcement Rule 40E-4.302(2), Florida Administrative Code, requires that the District take into consideration past violations of various rules adopted by the District. No enforcement action relating to the property has ever been taken by the District against the Applicant for any violation of ERP requirements. Although Petitioners suggested that unpermitted fill activities have taken place on the southeastern part of the 40-acre site, an inspection by District personnel revealed that unpermitted activities were "not significant." Further, Special Condition 23 requires that the Applicant restore "that portion of the disturbed wetland area located in the southeast corner of the site which is to be included in the wetland preserve area." Therefore, any impacts to the 40-acre site resulting from past unpermitted activities have been considered and remedied.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the South Florida Water Management District enter a final order granting Permit Application No. 010223-5 of Conquest Developments USA, L.C., for an Environmental Resource Permit. DONE AND ENTERED this 24th day of July, 2002, in Tallahassee, Leon County, Florida. ___________________________________ DONALD R. ALEXANDER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 24th day of July, 2002. COPIES FURNISHED: Henry Dean, Executive Director South Florida Water Management District Post Office Box 24680 West Palm Beach, Florida 33416-4680 Anthony P. Pires, Jr., Esquire Woodward, Pires & Lombardo, P.A. 3200 Tamiami Trail North, Suite 200 Naples, Florida 34103-4105 Robert E. Murrell, Esquire Samouce, Murrell & Francoeur, P.A. 800 Laurel Oak Drive, Suite 300 Naples, Florida 34108-2713 Keith W. Rizzardi, Esquire South Florida Water Management District Post Office Box 24680 West Palm Beach, Florida 33416-4680 Kenneth B. Cuyler, Esquire Goodlette, Coleman & Johnson, P.A. 4001 Tamiami Trail North, Suite 300 Naples, Florida 34103-3556

Florida Laws (3) 120.569120.577.02
# 8
RICHARD L. SILVANI, DICK W. THOMPSON, JAMES E. AND MARILYN BATES, JOYCE MENZIE, JAMES M. GIBSON, CLAUDIA C. MUNSELL, MR. AND MRS. PHILLIP E. DURST, DONALD R. SOSNOSHR, MR. AND MRS. ROBERT L. NELSON, AND MRS. RICHARD LADOW vs SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT AND HERNANDO COUNTY, 97-005978 (1997)
Division of Administrative Hearings, Florida Filed:Brooksville, Florida Dec. 23, 1997 Number: 97-005978 Latest Update: Jun. 18, 2004

The Issue The issue is whether Hernando County's application for an environmental resource permit authorizing the construction of a new surface water management system to serve a 7.85 acre drainage system improvement three miles southeast of Brooksville, Florida, should be approved.

Findings Of Fact Based upon all of the evidence, the following findings of fact are determined: Background Petitioners, Richard J. Silvani, Dick W. Thompson, James E. and Marilyn Bates, Joyce Menzie, James M. Gibson, Claudia C. Munsell, Mr. and Mrs. Phillip E. Durst, Donald R. Sosnoski, Mr. and Mrs. Robert L. Nelson, and Mr. and Mrs. Richard Ladow (Petitioners), are property owners in central Hernando County, Florida. Respondent, Southwest Florida Water Managment District (District), is the state agency charged with the responsibility of issuing Environmental Resource Permits (ERP) within its jurisdictional boundaries. Respondent, Hernando County (County), is a local government seeking the issuance of a permit for the purpose of alleviating drainage and flooding problems in a subdivision known as High Point Gardens in the central part of the County. On June 11, 1997, the County filed an application with the District seeking authorization to construct a low earthen berm to help control flooding in High Point Gardens, an eighty- five unit residential subdivision. On September 29, 1997, the District gave notice of its intention to issue ERP No. 449342.01 authorizing the "construction of a new surface water management system to serve a 7.85 acre drainage system improvement known as the Hernando County - High Point Gardens Drainage Improvements." The project is located off Sun Hill Lane, three miles southeast of Brooksville, Florida, in central Hernando County. On an undisclosed date, but in a timely fashion, Petitioners filed their Petition for Informal Hearing challenging the issuance of the permit. As grounds, Petitioners alleged that the permit application contained "possible miscalculations of design" which would "alter the natural water flow route"; "adversely affect several acres of natural wetlands by changing hydrology of surface area"; "adversely affect adjacent uplands by innundating forest areas never before flooded by heavy rainfall"; "not guarantee 100% flood protection to the few affected homes"; and "create flood problems to adjacent homes and property by diverting stormwater from natural flow (north) to area east of 'proposed' retention area." The petition further alleged that the "'proposed' area should not be normal recepient [sic] of excess water from Cedar Falls subdivision" and that "all affected properties are not owned or easements acquired by Hernando County for surface water storage." The filing of the petition prompted the initiation of this proceeding. The Permit The High Point Gardens subdivision, which lies within the Bystre Lake Basin, is a "relatively old subdivision," having been built around the 1970's. There is a low area in the middle of the subdivision, and it has "[s]everal sinks with a natural drainage within the area." Because the thirty-square-mile basin is a closed drainage basin, with no natural outflows, "significant" flooding problems have been present throughout the basin since at least the 1980's. In an effort to resolve flooding problems within the basin, the County and District jointly sanctioned a study by a consulting firm, Dames and Moore, to provide suggested alternative actions to correct the problem. The firm's first interim report was rendered on August 5, 1988, and a final report known as the Bystre Lake Stormwater Management Master Plan was rendered in August 1989. Among other things, the consultant's report recommended that a berm be constructed to relieve the flooding in the High Point Gardens' area. Acting on the report, the County obtained a construction permit from the District in August 1991 in accordance with the consultant's recommendation, but construction on the project was not commenced prior to the permit expiring in 1994. Although the consultant's report was the genesis for the first permit, the plans and specifications for the new berm have been modified by engineers after further study and review. It is noted that the total land area of the project will be less than 100 acres. The High Point Gardens subdivision lies within sub-basin 304 of the basin. Under the new proposal, water which now comes into sub-basins 304 and 406 from sub-basins 305 and 306 will be stored in those latter sub-basins. The requested permit would authorize the County to construct a low earthen berm along the western side of sub-basin 406 and the southern boundary of sub- basin 304 to help control flooding in the subdivision. The proposed berm will range from one to five feet in height and extend some 3,250 feet, or approximately six-tenths of a mile. It will range from eight to ten feet in width with a side slope of 4 to 1. The berm will impound water upstream of the berm to an elevation of 90.5 NGVD, which is 1.5 feet higher than the water would rise in the area under natural conditions. The water will be stored in two natural ponds which are now located in the project area. Once the water reaches an elevation of 90.5 NGVD, which will occur only during an event exceeding a 25-year storm event, three overflow structures will become operative and are designed to mimic the natural water flows of the area. After the berm is constructed, all basins "downstream" of the berm, including sub-basins 304, 405, and 406, will have "significantly lower flood elevations than the 10, 25 and 100- year storm event." That is to say, existing flooding to the north and east of the proposed berm will be lessened. To the extent that additional impoundment of water behind the berm will occur, or flooding beyond the berm may occur during a 100-year storm event, the County will acquire easements from local property owners to store the additional water. Until the aquisition of land occurs, construction cannot begin. There is one already disturbed wetland area near the proposed construction area. No mitigation is required, however, since the impact will be temporary and the area is expected to naturally revegetate itself. There will be no adverse impacts to fish, wildlife, or adjacent wetlands. Neither will the project create any other environmental concerns. While there will be some impact to upland trees caused by the impounded water, under existing District rules, that impact cannot be used as a basis to deny the permit. Based on generally accepted engineering principles, the project is capable of being effectively performed and can function as proposed. Also, the project can be effectively operated and maintained. The County has the resources to undertake the project in accordance with the terms and conditions of the permit. The greater weight of credible and persuasive evidence supports a finding that the County has given reasonable assurances that all applicable criteria for the issuance of a permit have been met. Petitioners' Objections At hearing, Petitioners contended that the overflow structures for the berm would alter the natural flow of water, and increase the flow of water to the east of the proposed project, where several Petitioners reside. As previously noted, however, the more credible evidence shows that the project will not increase the natural flow of water to the east of the berm. More specifically, expert testimony demonstrated that the regular flow through each weir in the post-development condition will not be adversely greater than what occurred during the pre- development condition. Petitioners also contended that the wetlands will be negatively impacted by the project. Contrary expert testimony by witness Defoe established, however, that there will be no permanent adverse impacts to wetlands, fish, or wildlife if the permit is approved. Petitioners next contended that the process was flawed because very few on-site inspections of the project area were made by District and County personnel, especially during the rainy season, before the application was preliminarily approved. There were, however, on-site inspections by District and County staff and consultants, and it was not shown that the lack of additional inspections affected the validity of their studies. A further contention was made at hearing that the information supporting the application was insufficient and that more study, including soil boring tests, should have been made. As to additional soil boring tests, the evidence shows that it is not a common engineering practice to perform soil testing throughout the entire area that will be submerged. Therefore, the existing tests were adequate to support the engineering assumptions. Further, even if there were some infirmities in the data and assumptions used and made in the 1989 Dames and Moore report, as alleged by Petitioners, the errors or omissions were minor, they were subject to later refinement by professional engineers, and they did not materially affect the overall validity of the current application. Finally, the application file contains uncontradicted technical information supporting the issuance of the permit. Petitioners' other concerns, while sincere and well- intended, are not relevant to the permitting process. For example, a concern that the construction of a berm will decrease nearby property values, even if true, is not a consideration in the permitting process. Similarly, Petitioners' valid concern that some nearby upland trees will be damaged if water levels rise for a prolonged period of time is not a basis under existing District rules to deny the permit. At the same time, whether the project is cost-effective and the best alternative for alleviating flooding conditions in the area are political decisions for the County, and thus they are not in issue in this proceeding. Finally, Petitioners have pointed out that the County has not completed acquisition of the necessary easements for the project, and that until this is done, a permit should not issue. However, the District has specifically provided as a condition precedent to any construction work that the County finalize ownership or control for all property where water levels will be raised by the project.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that the Southwest Florida Water Management District enter a final order granting Hernando County's application for Standard General Environmental Resource Permit No. 449342.01. DONE AND ENTERED this 8th day of June, 1998, in Tallahassee, Leon County, Florida. DONALD R. ALEXANDER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675, SUNCOM 278-9675 Fax Filing (850) 921-6847 Filed with the Clerk of the Division of Administrative Hearings this 8th day of June, 1998. COPIES FURNISHED: E. D. "Sonny" Vergara, Executive Director Southwest Florida Water Management District 2379 Broad Street Brooksville, Florida 34609-6899 Chester Bradshaw 18520 Bradshaw Road Dade City, Florida 33523 Richard L. Silvani 24419 Lanark Road Brooksville, Florida 34601 Margaret M. Lytle, Esquire 2379 Broad Street Brooksville, Florida 34609-6899 Robert Bruce Snow, Esquire 20 North Main Street, Room 462 Brooksville, Florida 34601

Florida Laws (2) 120.569120.57 Florida Administrative Code (2) 40D-4.30140D-40.302
# 9
ARTHUR PIVIROTTO AND ANN H. PIVIROTTO vs JOINT FACILITIES BOARD OF RIVER OAKS HOMEOWNERS ASSOCIATION, INC., LITTLE OAKS HOMEOWNERS ASSOCIATION, INC., 96-000870 (1996)
Division of Administrative Hearings, Florida Filed:West Palm Beach, Florida Feb. 20, 1996 Number: 96-000870 Latest Update: Feb. 01, 1999

The Issue The issue in this case is whether an Application to the South Florida Water Management District for Authority to Utilize Works or Land of the District filed by Respondents, Joint Facilities Board of River Oaks H.O.A. and Little Oaks H.O.A., should be approved by the South Florida Water Management District.

Findings Of Fact Petitioners, Arthur Pivirotto and Ann H. Pivirotto presented no evidence in this matter. Petitioners have, therefore, failed to meet their burden of proof that Right of Way Occupancy Permit Application Number 94-1005-2 should not be granted.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the South Florida Water Management District enter a Final Order in case number 96-0870 dismissing the Petition for Formal Proceedings Per 40E-1.521 Fl. Admin. Code and 120.57 F.S. DONE and ENTERED this 2nd day of August, 1996, in Tallahassee Florida. LARRY SART1N, Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 2nd day of August, 1996. COPIES FURNISHED: William A. Fleck, Esquire 6650 West Indiantown Road Suite 200 Jupiter, Florida 33458 Charles H. Burns, Esquire 1080 East Indiantown Road Jupiter, Florida 33477 Scott Allen Glazier, Esquire South Florida Water Management District 3301 Gun Club Road West Palm Beach, Florida 33406 Donald S. Fradley, Esquire 27 Pennock Lane Jupiter, Florida 33458 Alan J. Cooper, Esquire Tequesta Corporate Center 250 Tequesta Drive, Suite 200 Tequesta, Florida 33469 Samuel E. Poole, III, Executive Director Department of Environmental Protection South Water Management District Post Office Box 24680 West Palm Beach, Florida 33146

Florida Laws (2) 120.57373.085 Florida Administrative Code (2) 40E-1.52140E-6.091
# 10

Can't find what you're looking for?

Post a free question on our public forum.
Ask a Question
Search for lawyers by practice areas.
Find a Lawyer