Elawyers Elawyers
Washington| Change
Find Similar Cases by Filters
You can browse Case Laws by Courts, or by your need.
Find 48 similar cases
DEPARTMENT OF INSURANCE vs FRANK THOMAS LAZZARA, 01-003908PL (2001)
Division of Administrative Hearings, Florida Filed:Tampa, Florida Oct. 09, 2001 Number: 01-003908PL Latest Update: Jul. 08, 2024
# 1
DEPARTMENT OF REVENUE vs. SHERWOOD GARDEN APARTMENTS, INC., 77-001456 (1977)
Division of Administrative Hearings, Florida Number: 77-001456 Latest Update: Apr. 12, 1978

Findings Of Fact John F. Cole, David J. Hayes and Andre LeClerc conveyed certain real estate situated in Broward County ("the property") to respondent by quitclaim deed dated December 16, 1976, and recorded on December 29, 1976. This instrument reflects payment of a documentary stamp tax in the amount of thirty cents ($0.30) as well as a documentary surtax. On September 30, 1971, Thomas N. Sprague and Peggy A. Sprague had mortgaged the property to Merle Ford to secure repayment of the principal sum of twenty-three thousand five hundred dollars ($23,500.00). On October 1, 1971, the Spragues mortgaged the property to Atlantic Federal Savings and Loan Association of Fort Lauderdale to secure repayment of the principal sum of one hundred three thousand dollars ($103,000.00) On November 21, 1973, John A. Kasbar, as trustee, mortgaged the property to the Spragues to secure repayment of the principal sum of twenty- three thousand one hundred dollars ($23,100.00) On June 5, 1969, Esther E. Adams conveyed the property by warranty deed to Andre LeClerc, as trustee. The warranty deed reflected payment of a documentary stamp tax in the amount of five hundred forty-three dollars ($543.00). The property which was the subject of these transactions is evidently worth a substantial sum of money, but the evidence fails to establish the value of the interest quitclaimed on December 16, 1976, and does not establish what consideration for the quitclaim deed was given, if any was given.

Recommendation Upon consideration of the foregoing, it is RECOMMENDED: That the notice of proposed assessment be withdrawn. DONE and ENTERED this 13th day of December, 1977, in Tallahassee, Florida. COPIES FURNISHED: Mr. Edwin J. Stacker, Esquire Assistant Attorney General The Capitol Tallahassee, Florida 32304 ROBERT T. BENTON, II Hearing Officer Division of Administrative Hearings Room 530, Carlton Building Tallahassee, Florida 32304 (904) 488-9675 Mr. Ronald Payne, Esquire 621 South Federal Highway Fort Lauderdale, Florida

Florida Laws (2) 201.01201.02
# 3
DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION, CONSTRUCTION INDUSTRY LICENSING BOARD vs GLENN L. MUSTAPICK, 01-003830PL (2001)
Division of Administrative Hearings, Florida Filed:West Palm Beach, Florida Oct. 01, 2001 Number: 01-003830PL Latest Update: Sep. 23, 2002

The Issue Whether Respondent committed the offenses set forth in the Administrative Complaints and Amended Administrative Complaints and, if so, what action should be taken.

Findings Of Fact At all times material hereto, Respondent was licensed by Petitioner as a certified residential contractor, having been issued license number CR C040917. He has been licensed since March 16, 1987. Respondent was the qualifying agent of KM Homes, Inc. (KMH) from June 10, 1995 through March 13, 1997, more than one year but less than two years. On or about February 3, 1997, KMH filed a voluntary bankruptcy petition under Chapter 7 in the U.S. Bankruptcy Court, Southern District of Florida, Case No. 97-30498, with an estimate of assets of less than $50,000.00 and an estimate of liabilities of between $1 million and $10 million. The petition was signed by Kenneth H. Maltz, as president of KMH. On or about February 4, 1997, the next day, Kenneth H. Maltz and his wife, Susan Maltz, filed a joint voluntary bankruptcy petition under Chapter 7. Case No. 01-3827PL On or about April 28, 1996, KMH contracted with Daniel L. Simons and Carol L. Stefanski for the sale of a lot to Simons and Stefanski and for construction of a house on the lot. The contract price for the lot was $45,000.00 and for the construction of the home was $141,000.00, totaling $186,000.00. Respondent's license number did not appear in the contract. In accordance with the contract, Simons and Stefanski made the following payments to KMH: on or about April 28, 1996, $5,000.00; on or about August 21, 1996, $40,000.00; and on or about August 30, 1996, $42,229.60 and $747.00, through their lender, First Federal Savings of the Palm Beaches, pursuant to an August 21, 1996, mortgage loan of $128,000.00. The payments totaled $100,976.60. KMH applied for a building permit from Martin County to build the home for Simons and Stefanski. Respondent's license number appeared on the application. The building permit was never obtained. Beginning on or about August 27, 1996, and at various times thereafter, until approximately January 9, 1997, the lot was cleared and fill was delivered to the lot by KMH's subcontractor, Tideway Construction Company, Inc. (Tideway). The work by Tideway was the only work performed by KMH pursuant to the contract with Simons and Stefanski. KHM did not pay Tideway and Tideway recorded a lien on the lot for $4,084.00. KMH failed to remove Tideway's lien. On or about November 23, 1997, Tideway filed suit to foreclose its lien. Sometime in May 1998, Tideway released the lien in exchange for payment from Simons and Stefanski in the amount of 65 percent of the lien amount. Simons and Stefanski's lender paid the 65 percent from additional funds the lender loaned to Simons and Stefanski to enable them to complete their home. Tideway wrote off the remaining 35 percent. KMH never explained to Simons and Stefanski why it did not complete their home. KMH's trustee in the bankruptcy never offered to complete the work. Simons and Stefanski never fired KMH, never denied KMH access to the property to perform work, and never refused to pay KMH monies due under the contract. Simons considered KMH to have abandoned the job. Simons and Stefanski filed a proof of claim in KMH's bankruptcy for an unsecured non-priority claim in the amount of $58,000.00. They received nothing from the bankruptcy action. In the latter part of 1998, Simons and Stefanski had their home completed by another contractor, Murex, for $143,270.00. The house that Murex completed for Simons and Stefanski was essentially the same house that KMH was to construct, except that the roof structure was different and the garage and back porch were a little larger. KMH never provided Simons and Stefanski with notification of the Construction Industries Recovery Fund. Simons and Stefanski never had any direct dealings with Respondent personally. They attempted to sue Respondent but were unsuccessful. As of November 15, 2001, Petitioner's costs of investigation and prosecution for Case No. 01-3827PL, excluding costs associated with an attorney's time, totaled $457.88. Case No. 01-3828PL On or about June 6, 1996, KMH contracted with Carol Morris for construction of a house on a lot owned by Morris. The contract price for the construction of the house was $287,940.00. Respondent's license number did not appear in the contract. In accordance with the contract, Morris made the following payments to KMH: on or about February 28, 1996, $1,000.00; on or about June 10, 1996, $27,000.00; and on or about August 2, 1996, $109,240.00. The payments totaled $137,240.00. Morris obtained a mortgage loan in the amount of $150,000.00 from First Bank of Florida to finance part of the contract price. On or about September 17, 1996, KMH applied for a building permit from Palm Beach Gardens to construct the home for Morris. Respondent's license number appeared on the application. On or about September 26, 1996, the building permit was approved and issued, bearing building permit number 28644. From approximately September to December 1996, KMH performed work pursuant to the contract and thereafter, did not perform any more work on the home. KMH failed to complete the construction of Morris' home. KMH never explained to Morris why it did not complete her home. KMH's trustee in the bankruptcy never offered to complete the work. Morris never fired KMH, never denied KMH access to the property to perform work, and never refused to pay KMH monies due under the contract. Morris considered KMH to have abandoned the job. KMH's subcontractors/material suppliers recorded liens on Morris' property. The subcontractors/material suppliers recorded liens were as follows: on December 12, 1996, Tideway for $8,438.00; on January 16, 1997, Buckeye Plumbing, Inc. (Buckeye Plumbing) for $3,676.00; on January 22, 1997, Tarmac Florida, Inc. (Tarmac) for $6,296.40; on January 23, 1997, Electrical Express, Inc. (Electrical Express) for $450.00; on February 13, 1997, E. M. Brandon, Inc. (Brandon) for $2,164.00; on February 18, 1997, Tom Rawn Masonry, Inc. (TR Masonry) for $16,454.00; and on April 3, 1997, Spacerace Enterprises, Inc. (Spacerace) for $7,850.00. Morris paid KMH for all the work or materials pertaining to the liens. KMH failed to remove any of the liens. Morris never paid any monies directly to the lien holders to remove any of the liens. However, Morris' lender, First Bank of Florida, assisted her with the resolution of the liens, including allowing its attorney to act as Morris' representative in resolving the liens. In May 1998, Tideway released its lien in exchange for payment by Morris' lender in the amount of 65 percent of the lien amount. Tideway wrote off the remaining 35 percent. The evidence is unclear as to whether Morris was obligated to repay the lender. Buckeye Plumbing, Electrical Express, TR Masonry, Inc., and Spacerace never received any money on their liens and the entire amount of their liens was a complete loss. Tarmac sued to foreclose on its lien, but ultimately dismissed its lawsuit and wrote off the amount of its lien as a bad debt. No testimony was presented regarding the final result of the lien held by Brandon. Morris obtained the services of another contractor, Home Work Group, Inc. (Home Work), to complete the construction of her home. Morris used the original mortgage loan of $150,000.00, a shortfall loan from the same lender in the amount of $45,000.00, and her savings of approximately $43,000.00, to pay Home Work. On or about September 1998, Home Work completed the construction of Morris' house, which was essentially the same as the house which was to be constructed by KMH. Morris received notification of KMH's bankruptcy by mail. She filed a complaint with the bankruptcy court objecting to KMH's discharge. The bankruptcy court eventually dismissed Morris' complaint. Sometime during the year 2000, Morris received $900.00 from KMH's bankruptcy. KMH never provided Morris with notification of the Construction Industries Recovery Fund. During the transaction between KMH and Morris, she knew Respondent as the construction manager for KMH. As of November 15, 2001, Petitioner's costs of investigation and prosecution for Case No. 01-3828PL, excluding costs associated with an attorney's time, totaled $478.70. Case No. 01-3829PL On or about February 23, 1996, KMH contracted with Fred W. Connell, Jr., and his wife, Celia M. Connell, for construction of a house on a lot that the Connells would purchase separately, not as a part of the contract. The contract price for the construction of the house was $258,870.00, which included $18,000.00 for a swimming pool. Respondent's license number did not appear in the contract. In accordance with the contract, the Connells made the following payments to KMH: on or about February 23, 1996, $5,000.00; on or about February 29, 1996, $30,000.00; on or about November 7, 1996, $8,687.00; on or about November 25, 1996, through their lender, First Bank of Florida, pursuant to a mortgage loan, $33,541.00; and on or about December 16, 1996, $24,393.00. The payments totaled $101,621.00. KMH applied for a building permit from the City of North Palm Beach to construct the home for the Connells. Respondent's name and license number appeared on the application. On or about November 5, 1996, the building permit was approved and issued, bearing building permit number 96-01386. From approximately November to December 1996, KMH performed work pursuant to the contract and thereafter, did not perform any more work on the home. KMH failed to complete the construction of the Connells' home. In December 1996, the City of North Palm Beach issued a stop work order due to voids in the concrete walls that made, according to the City of North Palm Beach, the structure of the house unsafe. After the issuance of the stop work order, KMH failed to resume work on the house. KMH never explained to the Connells why it did not complete their home. The Connells fired KMH only after they received notification of KMH's filing for bankruptcy. KMH's trustee in the bankruptcy never offered to complete the work. The Connells considered KMH to have abandoned the job. KMH's subcontractors/material suppliers recorded liens on the Connells' property. The subcontractors/material suppliers and recorded liens were as follows: on January 16, 1997, Palm Beach Masonry (PB Masonry) for $12,125.00; on January 17, 1997, Sasso Air Conditioning, Inc. (Sasso Air) for $550.00; on January 22, 1997, Tarmac for $4,239.21; on January 28, 1997, CPS Construction, Inc. (CPS Construction) for $2,580.00; on January 31, 1997, Gulf Stream Lumber Company (Gulf Stream Lumber) for $19,461.00; and on March 24, 1997, Waste Management of Florida, Inc. (Waste Management) for $276.50. The Connells paid KMH for all the work or materials pertaining to the liens. KMH failed to remove any of the liens. The Connells paid its lender, First Bank of Florida, $25,000.00 in exchange for the lender's assistance in resolving the liens. PB Masonry and Waste Management never received any money on their liens and the entire amount of their liens was a complete loss. On or about August 4, 1997, Sasso Air gave a partial release of its lien in return for payment in the amount of $275.00. Tarmac's notice to owner was untimely, so it chose to not pursue foreclosure proceedings and instead wrote the amount of its lien off as a bad debt. On or about November 11, 1997, Gulf Stream Lumber released its lien in return for payment of $5,000.00 from First Bank of Florida. On May 13, 1997, CPS Construction released its lien in exchange for payment from the Connells in the amount of $2,500.00. On or about April 22, 1997, the Connells obtained the services of another contractor, Villafranca Design and Development, L.C. (Villafranca Design), to complete the construction of their home for $221,000.00. The Connells, through their lender, paid Villafranca Design. Their home was completed shortly before Christmas 1997. The house completed by Villafranca Design was essentially the same as the house which was to be constructed by KMH. Because KMH failed to complete the Connells' home, the Connells, their two children and their two dogs were forced to live on the Connells' boat and to store their furniture for almost a year. During that year, the Connells had to pay dockage fees to live on their boat and storage fees for their furniture. The Connells estimate that the difference in the contract price of their home with KMH and what they eventually paid for their home was conservatively $100,000.00. The Connells did not receive any money from KMH's bankruptcy. KMH never provided the Connells with notification of the Construction Industries Recovery Fund. During the transaction between KMH and the Connells, the Connells knew Respondent as someone who worked in the KMH office. As of November 15, 2001, Petitioner's costs of investigation and prosecution for Case No. 01-3829PL, excluding costs associated with an attorney's time, totaled $519.43. Case No. 01-3830PL On or about September 19, 1996, KMH contracted with William and Iceline Chang for the construction of a house on the lot owned by the Changs. The contract price for the construction of the home was $205,620.00. Respondent's license number did not appear in the contract. In accordance with the contract, the Changs made the following payments to KMH: on or about September 16, 1996, $10,000.00; and on or about October 10, 1996, $10,620.00. Pursuant to a change order for additional site preparation and fill, on or about October 7, 1996, the Changs paid KMH $9,400.00. On or about December 16, 1996, KMH applied for a building permit from Palm Beach County to build the Changs' home. Respondent's license number and Respondent's name as the qualifying agent for KMH appeared on the application. The building permit was never obtained due to KMH's failing to submit the construction plans to Palm Beach County's building department. On December 13, 16, and 19, 1996, the Changs' lot was cleared and fill was delivered to the lot by KMH's subcontractor, Tideway. The work by Tideway was the only work performed by KMH pursuant to the contract with the Changs. KHM did not pay Tideway and Tideway recorded a lien on the lot for $10,900.00. KMH failed to remove Tideway's lien. On or about June 6, 1997, Tideway agreed with the Changs to release the lien in exchange for payment from them in the amount of $9,810.00. The Changs paid Tideway in six monthly installments, June through November 1997, of $1,635.00. On or about November 26, 1997, Tideway gave the Changs a release of its lien. KMH never explained to the Changs why it did not complete their home. KMH's trustee in the bankruptcy never offered to complete the work. The Changs never fired KMH, never denied KMH access to the property to perform work, and never refused to pay KMH monies due under the contract. The Changs considered KMH to have abandoned the job. The Changs had their home completed by another contractor, Villafranca Design, for $203,500.00. Villafranca Design submitted the same construction plans to Palm Beach County's building department that KMH was to use to construct the Changs' home. On or about May 7, 1997, a building permit was issued, bearing permit number B97012080. The house that Villafranca Design completed for the Changs was essentially the same house that KMH was to construct. On or about February 26, 2000, the Changs received $643.29 from KMH's bankruptcy. KMH never provided the Changs with notification of the Construction Industries Recovery Fund. The Changs never had any direct dealings with Respondent personally. As of November 15, 2001, Petitioner's costs of investigation and prosecution for Case No. 01-3830PL, excluding costs associated with an attorney's time, totaled $714.11. Case No. 01-3831PL On or about July 30, 1996, KMH contracted with Harold and Jean Bell to sell them a lot and construct a house on the lot. The contract price for the lot was $53,000.00 and the construction of the home was $186,000.00, totaling $239,000.00. Respondent's license number did not appear in the contract. In accordance with the contract, on or about August 1, 1996, the Bells paid a deposit of $5,000.00 to KMH. On September 19, 1996, the Bells paid, as closing costs, $67,147.63 to Universal Land Title, Inc., which included the cost for the lot and an additional deposit toward construction in the amount of $13,600.00. Subsequently, the Bells received a deed to the lot. KMH never obtained a building permit to construct the house. On or about December 11, 1996, the Bells' lot was cleared and fill was delivered to the lot by KMH's subcontractor, Tideway. The work by Tideway was the only work performed by KMH pursuant to the contract with the Bells. KHM did not pay Tideway, and Tideway recorded a lien on the lot for $3,688.00. KMH failed to remove Tideway's lien. Tideway never received any money on its lien and the entire amount of its lien was a complete loss. KMH never explained to the Bells why it did not complete their home. KMH's trustee in the bankruptcy never offered to complete the work. The Bells never fired KMH, never denied KMH access to the property to perform work, and never refused to pay KMH monies due under the contract. The Bells considered KMH to have abandoned the job. The Bells had their home, with extras, completed by another contractor, Villafranca Design, for approximately $208,000.00. On or about August 2, 2000, the Bells received $996.95 from KMH's bankruptcy. KMH never provided the Bells with notification of the Construction Industries Recovery Fund. On October 1, 2002, Mr. Bell obtained a civil judgment against KMH in the amount of $24,199.64, plus costs of $264.75; prejudgment interest of $21,664.88; and attorney's fees of $2,395.00, totaling $48,524.27. The Bells never had any direct dealings with Respondent personally. As of November 15, 2001, Petitioner's costs of investigation and prosecution for Case No. 01-3831PL, excluding costs associated with an attorney's time, totaled $305.84. Case No. 01-3832PL On or about May 26, 1996, KMH contracted, in a revised contract, with Erol and Yildiz Aksoy for the sale of a lot and construction of a house on a lot. The contract price for the lot was $58,000.00 and construction of the house was $242,000.00, totaling $300,000.00. The revised contract entered into evidence at hearing was incomplete. No determination could be made as to whether Respondent's license appeared in the revised contract. In accordance with the contract, the Aksoys made the following payments to KMH: on or about October 28, 1994, $1,000.003; on or about June 5, 1996, $23,000.00; on or about August 14, 1996, $12,545.00; on or about October 4, 1996, $21,800.00; on or about October 17, 1996, $1,323.00; on or about November 2, 1996, $21,800.00; on or about November 20, 1996, $7,123.00 and $21,800.00; on or about November 22, 1996, $21,800.00; on or about December 13, 1996, $21,800.00; and on or about January 2, 1997, $21,800.00 and $5,000.00. The payments totaled $180,791.00. On or about July 26, 1996, KMH executed and delivered a deed to the Aksoys for the lot. KMH performed work pursuant to the contract, but only performed 55 percent to 60 percent of the construction contracted for. After January 1997, KMH failed to perform any further work on the Aksoys' home. KMH failed to complete the construction of Aksoys' home. KMH never explained to the Aksoys why it did not complete their home. KMH's trustee in the bankruptcy never offered to complete the work. The Aksoys never fired KMH, never denied KMH access to the property to perform work, and never refused to pay KMH monies due under the contract. The Aksoys considered KMH to have abandoned the job. The Aksoys filed a proof of claim in KMH's bankruptcy for an unsecured non-priority claim in the amount of $85,000.00. Sometime in the years 2000 or 2001, they received $918.00 from the bankruptcy action. KMH's subcontractors/material suppliers recorded liens on the Aksoys' property. The subcontractors/material suppliers and recorded liens were as follows: on January 8, 1997, Buckeye Plumbing for $2,570.00; on January 14, 1997, J. W. Hodges Drywall Textures, Inc. (Hodges Drywall) for $3,500.00; on January 15, 1997, Griffin & Wilson Stucco, Inc. (GW Stucco) for $6,040.00; on January 16, 1997, Gallina Electric, Inc. (Gallina Electric) for $3,732.00; on January 17, 1997, Sasso Air for $2,925.00; on January 21, 1997, K. D. Installation, Inc. (KD Installation) for $2,789.00; and on February 5, 1997, Macshmeyer Concrete Company of Florida, Inc. (Macshmeyer Concrete) for $5,814.00. The Aksoys paid KMH for all the work or materials pertaining to the liens. KMH failed to remove any of the liens. The Aksoys paid the lien holders to remove the liens, as follows: on or about February 18, 1997, $2,570.00 to Buckeye Plumbing; on or about April 7, 1997, $1,400.00 to Hodges Drywall, with the remaining unpaid amount ($2,100.00) being a loss for the company; on or about August 6, 1997, $7,760.10 to GW Stucco, which included additional monies for attorney's fees; on or about March 12, 1997, $1,866.00 to Gallina Electric; on or about April 7, 1997, $2,975.00 to Sasso Air; $1,500.00 to KD Installation (date of payment unknown); on or about March 12, 1997, $2,616.00 to Macshmeyer Concrete. The Aksoys also paid for work for which another KMH subcontractor, Spacerace Enterprises, Inc., claimed that KMH had failed to pay. On or about February 18, 1997, the Aksoys obtained the services of another contractor, Villafranca Design, to complete the construction of their home. The Aksoys paid Villafranca Design $145,250.00. In or around May 1997, Villafranca Design completed the construction of the Aksoys' house, which was essentially the same as the house which was to be constructed by KMH. KMH never provided the Aksoys with notification of the Construction Industries Recovery Fund. The Aksoys never had any direct dealings with Respondent personally. As of November 15, 2001, Petitioner's costs of investigation and prosecution for Case No. 01-3828PL, excluding costs associated with an attorney's time, totaled $606.48. Case No. 01-3833PL On or about December 11, 1995, KMH contracted with Milo and Jerolene Glass for construction of a house on a lot owned by the Glasses. The contract price for the construction of the house was $395,795.00. Respondent's license number did not appear in the contract. In accordance with the contract, the Glasses made the following payments to KMH: on or about November 13, 1995, $1,000.00; and on or about December 11, 1995, $39,079.00. The payments totaled $40,079.00. On or about May 21, 1996, KMH applied for a building permit from Palm Beach County to construct the home for the Glasses. Respondent's name as the qualifying agent for KMH and license number appeared on the application. Sometime thereafter in 1996, the building permit was approved and issued, bearing building permit number B96019588. From approximately November 1996 to January 1997, KMH performed work pursuant to the contract, but thereafter, did not perform any further work on the home. KMH failed to complete the construction of the Glasses' home. At the time KMH stopped working on the Glasses' home, a substantial amount of work remained to be completed. Furthermore, much of KMH's work had to be repaired or corrected. KMH never explained to the Glasses why it did not complete her home. KMH's trustee in the bankruptcy never offered to complete the work. The Glasses never fired KMH, never denied KMH access to the property to perform work, and never refused to pay KMH monies due under the contract. The Glasses considered KMH to have abandoned the job. KMH's subcontractors/material suppliers recorded liens on the Glasses' property. The subcontractors/material suppliers and recorded liens were as follows: on January 17, 1997, Sasso Air for $925.00; on January 23, 1997, Electrical Express for $750.00; and on January 28, 1997, R J G Masonry, Inc. (RJG Masonry) for $8,353.99. KMH failed to remove any of the liens. The evidence is unclear as to whether the Glasses paid KMH for all the work or materials pertaining to the liens. The Glasses paid to remove the liens. The Glasses paid the following: $925.00 to Sasso Air for which they received a final waiver of lien dated July 8, 1999; on or about February 14, 1997, $750.00 to Electrical Express for which they received a release of lien dated June 2, 1997; and on or about January 24, 1997, $8,353.99 to RJG Masonary. The Glasses did not obtain the services of another contractor to complete the construction of their home. Contractors whom they approached were very reluctant or unwilling to take over the project. Finally, the Glasses, who had prior experience as owners of other construction projects, became their own contractors and completed their home. They also received the assistance of a contracting firm, but the Glasses handled all the disbursements of funds to the suppliers for labor and materials. By September 2000, the Glasses had substantially completed their home and were living in it. At the time of the hearing, they had sold the house and moved to another location in Florida. The Glasses estimate that they expended $1,239,487.78 in the construction of their home. They maintain that this cost does not include approximately $80,000.00 that the Glasses claim that their original lender paid to KMH without their authorization. The amount paid by the Glasses exceeds the contract price because (1) KMH underbid the job; (2) the Glasses spent substantial sums to repair or correct KMH's work, which the Glasses estimate conservatively to be more than $200,000.00; and (3) the Glasses spent substantial sums on upgrades of contract allowance items. The Glasses received approximately $1,000.00 from KMH's bankruptcy. KMH never provided the Glasses with notification of the Construction Industries Recovery Fund. After the bankruptcy, Mrs. Glass contacted Respondent and requested the construction plans for the home. Respondent indicated that he did not have the plans. Mrs. Glass contacted Respondent again and he indicated that he may be able to locate the plans. Subsequently, Respondent contacted the Glasses and indicated that he had located the plans. The Glasses went to Respondent's place of business to retrieve the plans. After providing the plans, Respondent requested the Glasses to hire him to complete their home. The Glasses declined Respondent's offer because they considered Respondent's cost estimate to be too high and because of Respondent's association with KMH. As of November 15, 2001, Petitioner's costs of investigation and prosecution for Case No. 01-3833PL, excluding costs associated with an attorney's time, totaled $628.33. Case No. 01-3834PL On or about December 8, 1995, KMH contracted with Suzanne Beck for construction of a house on a lot that Beck would acquire at a later date (in 1996), not as a part of the contract. The contract price for the construction of the house was $133,500.00. Respondent's license number did not appear in the contract. In accordance with the contract, Beck made the following payments to KMH: on or about December 8, 1995, $5,000.00; on or about July 31, 1996, $8,350.00 and 5,643.09; on or about August 7, 1996, $5,030.88; on or about September 4, 1996, $12,051.05; on or about September 18, 1996, $12,051.05; on or about October 1, 1996, $12,051.05; on or about October 11, 1996, $12,051.05; on or about November 7, 1996, $12,051.05; and on or about November 26, 1996, $12,051.05 and $12,051.05. The payments totaled $108,381.32. KMH applied for a building permit from the Town of Jupiter to construct the home for Beck. Respondent's name and license number appeared on the application as the contractor. On February 12, 1996, the building permit was approved and issued, bearing building permit number 96-29588. From approximately August to December 1996, KMH performed work pursuant to the contract and thereafter, did not perform any more work on the home. KMH failed to complete the construction of the Beck's home. KMH never explained to Beck why it did not complete her home. Around the end of December 1996 or in January 1997, Beck notified KMH that she was taking over the project. Progress by KMH had been slow and Beck discovered that KMH had closed the doors of its business for a second time and was not paying its subcontractors. Beck considered KMH to have abandoned the job. She obtained an owner's building permit and completed the project, making payments directly to the suppliers of labor and materials. On February 7, 1997, Beck obtained a certificate of occupancy from the Town of Jupiter. KMH's subcontractors/material suppliers recorded liens on the Beck's property. The subcontractors/material suppliers and recorded liens were as follows: on January 6, 1997, American Aluminum and Insulation FireProofing Company, Inc. (American Alum.) for $385.00; on January 6, 1997, Buckeye Plumbing for $2,625.00; on January 14, 1997, Hodges Drywall for $8,280.00; on January 14, 1997, Rizzo Tile & Marble, Inc. (R Tile & Marble) for $1,870.70; on January 15, 1997, James M. Webster d/b/a Rain Flow of South Florida (Rain Flow) for $75.00; on January 17, 1997, K. D. Installation, Inc. (KD Installation) for $520.40; on January 17, 1997, Q. C. Cabinet Systems, Inc. (QC Cabinets) for $3,207.00; on January 17, 1997, Paul Temple Painting (PT Painting) for $2,534.75; on January 17, 1997, Sasso Air for $3,360.00; on January 28, 1997, James Velix Bobcat Service (Bobcat Service) for $1,450.00; on February 4, 1997, Tideway for $279.00; on February 7, 1997, Florida Builder Appliances, Inc. (Builder Appliances) for $2,936.20; on February 7, 1997, Mc D Sprinklers, Inc. (McD Sprinklers)for $1,275.00; on February 11, 1997, Builder Direct Carpet Sales (Direct Carpet) for $1,959.26; and on February 12, 1997, Pollard Electric, Inc. (Pollard Electric) for $3,640.00. Beck paid KMH for all the work or materials pertaining to the liens. KMH failed to remove any of the liens. Beck paid to remove the liens as follows: on or about June 18, 1997, $2,625.00 to Buckeye Plumbing; on or about March 9, 1999, $10,125.00 to PT Painting, Hodges Drywall, R Tile & Marble, and Direct Carpet; and on or about October 19, 1999, $3,360.00 to Sasso Air. Hodges Drywall released its lien for $4,000.00 and the remaining amount of its lien was not paid, which represents a loss to the company. Builder Appliances, Rain Flow, McD Sprinklers, QC Cabinets, and Tideway did not receive payment from any source and the entire amounts of their liens were complete losses. After Beck took over construction of her home from KMH, she spent $19,203.00 to complete the home. Beck did not receive any money from KMH's bankruptcy. KMH never provided Beck with notification of the Construction Industries Recovery Fund. During the transaction between KMH and Beck, she met with Respondent at the job-site on one occasion to discuss some aspects of the project with which she was dissatisfied. Beck had expressed her dissatisfaction in a letter to KMH's owner. As of November 15, 2001, Petitioner's costs of investigation and prosecution for Case No. 01-3834PL, excluding costs associated with an attorney's time, totaled $534.57.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Business and Professional Regulation, Construction Industry Licensing Board enter a final order: Dismissing the following counts: Count I of Case Nos. 01-3828PL, 01-3831PL, and 01-3833PL. Count IV of Case No. 01-3832PL. Finding that Glenn L. Mustapick committed all other violations in the counts of Case Nos. 01-3827PL, 01-3828PL, 01-3829PL, 01-3830PL, 01-3831PL, 01-3832PL, 01-3233PL, and 01-3834PL. Imposing a $25,000.00 administrative fine. Requiring Respondent to pay restitution not exceeding $25,000.00. Assessing $4,245.34 in costs for investigation and prosecution, excluding costs associated with an attorney's time, by the Department of Business and Professional Regulation, Construction Industry Licensing Board. Revoking the certified residential license, CR C040917, of Glenn L. Mustapick. DONE AND ENTERED this 3rd day of May, 2002, in Tallahassee, Leon County, Florida. ERROL H. POWELL Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 3rd day of May, 2002.

Florida Laws (13) 120.569120.5717.00117.002455.227489.119489.1195489.129489.1425489.143760.10775.082775.083
# 4
# 5
DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION, DIVISION OF REAL ESTATE vs TERRENCE M. MCMANUS, 02-003454PL (2002)
Division of Administrative Hearings, Florida Filed:West Palm Beach, Florida Sep. 03, 2002 Number: 02-003454PL Latest Update: Jul. 15, 2004

The Issue Whether Respondent committed the violation alleged in the Administrative Complaint, and, if so, what disciplinary action should be taken against him.

Findings Of Fact Based upon the evidence adduced at the final hearing and the record as a whole, including the admissions made by Respondent in the Joint Response to Pre-Hearing Order, the following findings of fact are made: At all times material to the instant case, Respondent was a Florida-licensed real estate salesperson. Since June of 2002, Respondent has been a Florida- licensed real estate broker. Respondent is a convicted felon as a result of a single felony conviction. 3/ In 2000, Respondent was involved in a real estate transaction in which he was the buyer. The property that was the subject of the transaction was located at 119 Hammocks Drive in West Palm Beach, Florida. The transaction was closed through a title company, Cypress Title Company (Cypress). The closing took place on May 15, 2000. Cypress was represented at the May 15, 2000, closing by Susan Anderson, a marketing representative with Cypress who conducted closings (approximately five or six a month) as part of her job responsibilities. Ms. Anderson had two years experience conducting closings at the time of the May 15, 2000, closing. At each closing at which she represented Cypress, Ms. Anderson was responsible for, among other things, collecting the funds necessary to effectuate the closing and making the appropriate disbursements. It was Ms. Anderson's routine practice, before turning a closing file over to Cypress' "post closer" following a closing, to "make sure [that] everything [that needed to be in the file was] there." Prior to the May 15, 2000, closing, Respondent was contacted by "someone from Cypress" and instructed to bring to the closing a cashier's check in the amount of $3,684.64 made payable to himself. Respondent was advised that the $3,684.64 represented an "estimate" of the amount he needed to pay from his own funds to close the transaction. On May 15, 2000, prior to the time of the closing, Respondent went to Bank United, where he had an account, and purchased a cashier's check in the amount of $3,684.64 made payable to himself, as he had been instructed to do. Respondent brought the cashier's check to the closing. At the closing, Respondent endorsed the check with his signature, underneath which he wrote, in accordance with his routine practice when endorsing checks, the number of his account at Bank United. He then handed the cashier's check to Ms. Anderson. The actual amount due from Respondent was $3,670.04, $14.64 less than the amount of the cashier's check. Accordingly, Ms. Anderson gave Respondent a check for $14.64. Following the closing, Ms. Anderson examined the closing file (in accordance with her routine practice). In doing so, it did not "come to [her] attention that the [cashier's] check [that Respondent had brought to the closing] was not there." After conducting such an examination, she gave the closing file to the "post-closer." The cashier's check that Respondent had given to Ms. Anderson at the May 15, 2000, closing was cashed at Bank United on May 17, 2000, by someone other than Respondent or Ms. Anderson. Pursuant to Bank United policy, "[o]nly the payee can cash [a cashier's] check." Bank United tellers are supposed to ask for a "picture ID" when a cashier's check is presented for cashing. There have been tellers at the bank, however, who have not followed this policy and, as a result, have been counseled or disciplined. 4/ Approximately, two months after the May 15, 2000, closing, Cypress' owner approached Ms. Anderson and told her that there was no proceeds check from Respondent in the closing file. Ms. Anderson was asked to contact Respondent to inquire about the matter, which she did. Respondent was initially "very cooperative." He gave Ms. Anderson his "account number [at Bank United] and [the name of a person] to call at the bank." Using the information Respondent had provided, Ms. Anderson was able to obtain a copy of the cashier's check that Respondent had given to Ms. Anderson at the closing and that subsequently had been cashed at Bank United. Kevin Wilkinson, an attorney acting on behalf of Cypress, also contacted Respondent. Mr. Wilkinson's tone, in Respondent's view, was accusatory and threatening. Respondent's response to Mr. Wilkinson's "aggressive[ness]" was to stop cooperating with Cypress.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is hereby RECOMMENDED that the Commission issue a final order dismissing the instant Administrative Complaint. DONE AND ENTERED this 28th day of January, 2003, in Tallahassee, Leon County, Florida. STUART M. LERNER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 28th day of January, 2003.

Florida Laws (7) 120.569120.5720.165455.225455.2273475.2590.610
# 6
CONSTRUCTION INDUSTRY LICENSING BOARD vs. G. T. FARRINGTON, JR., 76-001012 (1976)
Division of Administrative Hearings, Florida Number: 76-001012 Latest Update: Dec. 28, 1979

Findings Of Fact Respondent Farrington holds a registered general contractor's license. He has worked in the construction business in and around Pensacola, Florida, for the last ten or fifteen years at least. On April 25, 1975, respondent caused to be filed in the United States District Court for the Northern District of Florida an original petition under Chapter XI of the Bankruptcy Act, on behalf of Rotunda Construction Company, Inc. (Rotunda). Both at the time of the filing of the petition and at the time of the final hearing, respondent served as Rotunda's president and as its qualifying licensee. Respondent is also a principal stockholder in the corporation. There has been no adjudication of bankruptcy in the course of the Chapter XI proceedings. No receiver has been appointed, nor have Rotunda's creditors sought the appointment of a receiver. There has been no composition of creditors. Rotunda was in the business of building single family dwellings, using borrowed money which it repaid after the houses were finished and sold. In 1974, Rotunda had 20 to 30 houses under construction for which Commonwealth Corporation (Commonwealth) a mortgage broker, had agreed to supply financing. In June of 1974, however, Commonwealth experienced financial difficulties, initiated proceedings under the Bankruptcy Act, and stopped furnishing Rotunda the construction money it had contracted for. Without the money Commonwealth had promised, Rotunda was unable to meet all its obligations as they came due. (A dozen or so other contracting companies also had serious financial problems in the wake of Commonwealth's collapse.) When several major creditors threatened foreclosure suits, Rotunda filed a petition pursuant to Chapter XI of the Bankruptcy Act. At the time Rotunda initiated Chapter XI proceedings, the Citizens and Peoples National Bank was a principal creditor. The bank has since been satisfied and, in the opinion of Eric Jay Nicholson, who works for the Citizens and Peoples National Bank, respondent now enjoys a "very good" reputation for financial responsibility. John Scott Carr, a mortgage banker in the employ of Southern American Mortgage Co., has known respondent for eight years and has overseen the loan of more than $2,000,000.00 to respondent or to companies he controlled. According to Mr. Carr, respondent is among the "top one or two contractors in the area." Wayne Walden, formerly associated with the First Federal Savings and Loan Association of Santa Rosa County, testified that respondent is "very responsible financially." Respondent has a very good reputation among lenders, and has demonstrated outstanding financial responsibility. He is presently actively engaged in the contracting business. Since the filing of the petition, Southern American Mortgage Co., the First Federal Savings and Loan Association of Santa Rosa County, and Mr. Donald A. Shear, a concrete supplier, have all extended credit to respondent or corporations he controls.

Recommendation Upon consideration of the foregoing, it is RECOMMENDED: That the administrative complaint be dismissed. DONE and ENTERED this 14th day of October, 1977, in Tallahassee, Florida. ROBERT T. BENTON, II Hearing Officer Division of Administrative Hearings Room 530, Carlton Building Tallahassee, Florida 32304 COPIES FURNISHED: Mr. Barry Sinoff, Esquire 1010 Blackstone Building Jacksonville, Florida 32202 Mr. Charles S. Liberis, Esquire and Mr. Larry G. Parks, Esquire Post Office Drawer 1832 Pensacola, Florida 32598

# 7
FLORIDA REAL ESTATE COMMISSION vs. STEPHEN P. MCCRADY AND LANDMARK REAL ESTATE AND INVESTMENTS, 86-001145 (1986)
Division of Administrative Hearings, Florida Number: 86-001145 Latest Update: Aug. 19, 1986

Findings Of Fact At all times relevant hereto, respondent, Landmark Real Estate and Investment Exchange, Inc. (Landmark), was a corporation licensed as a broker. It holds license number 0170938 issued by petitioner, Department of Professional Regulation, Division of Real Estate (Division). Respondent, Stephen P. McCrady, was a licensed real estate broker having been issued license number 0227524 by petitioner. McCrady was also the qualifying broker and officer of Landmark. License renewal fees have apparently not been paid by respondents since 1984 and their licenses are accordingly considered to be inactive. However, such licenses can be reactivated by respondents paying the required fees and completing any necessary continuing education requirements. At the present time, McCrady's license has a status of "pending litigation" because of the instant proceeding. On October 28, 1983, the Division (then the Florida Real Estate Commission) entered a Final Order against respondents in which respondents were reprimanded and ordered to pay a $500 fine within thirty days from the date of order. This fine was never paid. On April 3, 1984, respondent McCrady filed a chapter 7 petition in the United States Bankruptcy Court for the Southern District of Florida. On September 17, 1984, that Court entered a Discharge of Debtor order which released the debtor (McCrady) "from all dischargeable debts" and declared null and void certain other debts. The order further provided that "all creditors who [sic] debts are discharged ... (or) whose judgments are declared null and void ... are hereby enjoined from commencing, continuing or employing any action, process or act to collect, recover or offset any such debt as a personal liability of the debtor." Respondent Landmark did not file a petition nor was it a party to McCrady's bankruptcy proceeding. When the agency Final Order was entered, McCrady could not afford to pay the $500 fine. However, he telephoned a Division attorney and asked if he could pay the fine by installments. He was told he could not do this. Shortly afterwards he filed for personal bankruptcy. It was his impression that the bankruptcy proceeding discharged all debts, including the $500 administrative fine. McCrady did not advise the Division that he had filed for bankruptcy until after the complaint in this proceeding had been filed. McCrady intends to again use his real estate license in the future. Because of serious personal and financial problems, he has not used the license for several years.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that respondents be found guilty of violating Rule 21V-10.31, Florida Administrative Code, and Subsection 475.25(1)(e), Florida Statutes (1985), and that they each be required to pay $250 within thirty days from date of the final order in this proceeding to satisfy the terms of the Final Order previously entered on October 23, 1983. Otherwise, their licenses should be revoked. DONE and ORDERED this 19th day of August, 1986, in Tallahassee, Florida. DONALD R. ALEXANDER Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 19th day of August, 1986. APPENDIX TO RECOMMENDED ORDER, CASE NO. 86-1145 Petitioner: Covered in finding of fact 1. Covered in finding of fact 2. Covered in finding of fact 2. Covered in finding of fact 3. COPIES FURNISHED: Susan J. Hartman, Esquire Post Office Box 1900 Orlando, Florida 32802 Ronald R. Rogowski, Esquire 628 S.E. 5th Avenue Ft. Lauderdale, Florida 33301 Mr. Harold R. Huff, Director Division of Real Estate Post Office Box 1900 Orlando, Florida 32802

Florida Laws (2) 120.57475.25
# 8
STEPHEN J. MATALA vs DEPARTMENT OF BANKING AND FINANCE, 93-005603 (1993)
Division of Administrative Hearings, Florida Filed:Tampa, Florida Sep. 30, 1993 Number: 93-005603 Latest Update: Jul. 25, 1995

Findings Of Fact Exhibit 2 evidences some 13 arrests of Petitioner, most of which are for the offense of larceny. Although this document is hearsay, Petitioner readily acknowledged that in 1980 and 1984 he was a drug addict and supported his habit by stealing. Exhibit 3 consists of 6 convictions of grand theft and burglary on August 1, 1980, another count in 1984 and one count of attempted grand theft on October 26, 1990. The period between 1980 and 1984 was a period in Petitioner's life immediately following his discharge from the armed forces. On October 26, 1990, Petitioner was adjudicated guilty of grand theft following a plea of nolo contendere to the charge of obtaining or using or attempting to obtain or use the property of another with intent to deprive the owner of the use thereof of personal property of the value of $300 or more. Petitioner testified that in 1990 his 19 year old stepson, who was preparing to enter college, while driving Petitioner's pickup truck, stopped near a parked vehicle and attempted to steal personal property therefrom, but fled when someone observed him. The license number of the pickup was traced to Petitioner. The stepson confessed his actions to Petitioner and when the police arrived, Petitioner, who already had a criminal record that could hardly be blemished further, told the police that he was the driver of the pickup. He was charged with the offense of attempted grand larceny, pled nolo contendere, was adjudicated guilty and was sentenced to 5 years in prison of which he served some 7 months. The stepson graduated from college and is now married, gainfully employed, and raising a family. When submitting his application for licensure, Petitioner further testified that he researched the definition of moral turpitude, spoke to his lawyer and other people regarding his conviction of grand larceny, and was told that the offense did not necessarily constitute an offense involving moral turpitude. Accordingly, Petitioner assumed that he had not been convicted of an offense involving moral turpitude and marked item 5 on his application "No" which asked if he had ever been found guilty of a crime involving fraud, dishonest dealing, or any other act of moral turpitude. Petitioner contends that he told Respondent's employees, with whom he discussed his application for licensure, of his criminal record and was told this was not disqualifying. Accordingly, he spent the money to obtain the required mortgage broker education certificate and to take and pass the examination for mortgage broker license, only to be told after these efforts that he could not qualify for licensure.

Recommendation It is RECOMMENDED that a Final Order be issued denying the application of Stephen J. Matala for a licensure as a mortgage broker. DONE AND ENTERED this 27th day of January 1994 in Tallahassee, Leon County, Florida. K. N. AYERS Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 27th day of January 1994. COPIES FURNISHED: Stephen J. Matala 32414 Marchmont Circle Dade City, Florida 33525 Lisa L. Elwell, Esquire Office of the Comptroller Department of Banking and Finance 1313 Tampa Street, Suite 615 Tampa, Florida 33602-3394 Honorable Gerald Lewis Comptroller, State of Florida The Capitol, Plaza Level Tallahassee, Florida 32399-0350 William G. Reeves, General Counsel Department of Banking and Finance The Capitol, Room 1302 Tallahassee, Florida 32399-0350