CONSTRUCTION INDUSTRY LICENSING BOARD vs. STEPHEN J. BOROVINA, 77-001442 (1977)
Division of Administrative Hearings, Florida Number: 77-001442 Latest Update: Feb. 21, 1978

The Issue The Florida Construction Industry Licensing Board, Petitioner, seeks to revoke the registered contractor's license of Stephen J. Borovina, Respondent, based on allegations, which will be set forth in detail hereafter, that he engaged in conduct violative of Chapter 468, Florida Statutes. The issue presented is whether or not the Respondent aided or abetted and/or knowingly combined or conspired with Mr. Howard North, an uncertified or unregistered contractor, to evade the provisions of Chapter 468.112(2)(b), and (c), Florida Statutes, by allowing North to use his certificate of registration without having any active participation in the operations, management, or control of North's operations. Based on the testimony adduced during the hearing and the exhibits received into evidence, I make the following:

Findings Of Fact The Respondent is a certified general contractor who holds license no. CGC007016, which is current and active. On or about July 25, 1976, Mr. and Mrs. Julius Csobor entered into a contract with Mr. and Mrs. Howard North for the construction of a home in Martin County, Florida, for a total price of $35,990. Neither Mr. or Mrs. North are certified or registered contractors in the State of Florida. (Petitioner's Composite Exhibit #2). Respondent applied for and was issued a permit by the Martin County Building Department to construct a residence for the Csobors at the same address stipulated in the contract between the Csobors and the Norths, i.e., Northwest 16th Street, Palm Lake Park, Florida. (Petitioner's Composite Exhibit #1). Howard North, a licensed masonry contractor for approximately nine (9) years was contacted by the Csobors through a sales representative from a local real estate firm. It appears from the evidence that North had previously constructed a "spec" house which the local realtor had sold and thus put the Csobors in contact with Mr. North when they were shown the "spec" house built by North. Evidence reveals that North contacted Borovina who agreed to pull the permit "if he could get some work from the job and could supervise the project". Having reached an agreement on this point, North purchased the lot to build the home for the Csobors and he orally contracted with the Respondent to, among other things, pull the permit, supervise construction, layout the home and do trim and carpentry work. North paid Respondent approximately $200 to layout the home for the Csobors. By the time that North had poured the slab and erected the subfloor, the Csobors became dissatisfied with his (North's) work and demanded that he leave the project. According to North, Respondent checked the progress of construction periodically. Prior to this hearing, the Csobors had never dealt with Respondent in any manner whatsoever. According to Csobor, North held himself out as a reputable building contractor. A contractor is defined in relevant part as any person who, for compensation, undertakes to, or submits a bid to, or does himself or by others, construct, repair, etc. . . . real estate for others. . . Chapter 468.102(1), Florida Statutes. Applying this definition to the facts herein, it appears that the Respondent, at least in a literal sense, satisfied the requirements and obligations of a contractor, as defined in Chapter 468.102, Florida Statutes. Thus, he contracted with North to oversee and/or supervise the project for the Csobors which he fulfilled, according to the testimony of North. Said testimony was not refuted and thus I find that no effort was made by Respondent to evade any provision of Chapter 468, Florida Statutes. Accordingly, I shall recommend that the complaint filed herein be dismissed in its entirety.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is hereby recommended that the complaint filed herein be dismissed in its entirety. RECOMMENDED this 4th day of November, 1977, in Tallahassee, Florida. JAMES E. BRADWELL Hearing Officer Division of Administrative Hearings 530 Carlton Building Tallahassee, Florida 32304 (904) 488-9675 COPIES FURNISHED: Barry S. Sinoff, Esquire 1010 Blackstone Building Jacksonville, Florida 32202 Stephen J. Borovina 2347 Southeast Monroe Street Stuart, Florida 33494 J. Hoskinson, Jr. Chief Investigator Florida Construction Industry Licensing Board Post Office Box 8621 Jacksonville, Florida 32211 ================================================================= AGENCY FINAL ORDER ================================================================= BEFORE THE FLORIDA CONSTRUCTION INDUSTRY LICENSING BOARD FLORIDA CONSTRUCTION INDUSTRY LICENSING BOARD, Petitioner, vs. DIVISION OF ADMINISTRATIVE HEARINGS, DOCKET NO. 77-1442 STEPHEN J. BOROVINA, CG C007016, 2347 S. E. Monroe Street, Stuart, Florida 33494, Respondent. / This cause came before the FLORIDA CONSTRUCTION INDUSTRY LICENSING BOARD at its regular meeting on February 10, 1978. Respondent was sent the Hearing Officer's findings and recommendations and was given at least 10 days to submit written exceptions to the recommended order. Respondent was notified of the meeting so that respondent or counsel might appear before the Board. Respondent did not appear The FLORIDA CONSTRUCTION INDUSTRY LICENSING BOARD on February 10, 1978, after reviewing a complete transcript of the Administrative Hearing, by motion duly made and seconded voted to revoke the certified general contractor's license of STEPHEN J. BOROVINA. It is therefore, ORDERED that the certification of respondent STEPHEN J. BOROVINA, Number CG C007016, be and is hereby revoked. Respondent is hereby notified that he has 30 days after the date of this final order to appeal pursuant to Chapter 120, Florida Statutes, and the Florida Appellate Rules. DATED this 13th day of February, 1978. FLORIDA CONSTRUCTION INDUSTRY LICENSING BOARD BY: JOHN HENRY JONES, President ================================================================= SECOND AGENCY FINAL ORDER ================================================================= BEFORE THE FLORIDA CONSTRUCTION INDUSTRY LICENSING BOARD STEPHEN J. BOROVINA, CG C007016, Respondent/Appellant, vs. DIVISION OF ADMINISTRATIVE HEARINGS, DOCKET NO. 77-1442 FLORIDA CONSTRUCTION INDUSTRY LICENSING BOARD, Petitioner/Appellee. / This cause came before the Florida Construction Industry Licensing Board at its regular meeting on August 3, 1979. The respondent was sent the Hearing Officer's findings and recommendations and was given at least 10 days to submit written exceptions to the recommended order. Respondent was notified of the meeting so that respondent or counsel might appear before the Board. Respondent did appear. The Florida Construction Industry Licensing Board, on August 3, 1979, after reviewing a complete transcript of the Administrative Hearing, by motion duly made and seconded, voted to revoke the certified general contractor's license of Stephen J. Borovina, No. CG C007016. On February 13, 1978, the certification of respondent, Stephen J. Borovina, No. CG C007016, was revoked by order of the Florida Construction Industry Licensing Board. On April 25, 1979, the District Court of Appeal of the State of Florida, Fourth District, in Case Number: 78-527, reversed the final order of the Florida Construction Industry Licensing Board. That Court remanded the above captioned case to the Board to further consider the matter and enter such order as it may be advised in conformity with Section 120.57(1)(b)(9), Florida Statutes (1977). In accordance with the decision of the Florida District Court of Appeal, Fourth District, the Board has reconsidered the above captioned matter and finds as follows: The Board rejects the recommended order as the agency's final order. The Board adopts the first paragraph of the hearing officer's finding of fact. The Board, however, rejects the findings of fact found in the second paragraph of the hearing officer's findings. The second paragraph states as follows: A contractor is defined in relevent(sic) part as any person who, for compensation, undertakes to, or submits a bid to, or does himself or by others, construct, repair, etc. real estate for others...Chapter 468.102(1), Florida Statutes. Applying this definition to the facts herein, it appears that the Respondent, at least in a literal sense, satisfied the requirements and obligations of a contractor, as defined in Chapter 468.102, Florida Statutes. Thus, he contracted with North to oversee and/or supervise the project for the Csobors which he fulfilled, according to the testimony of North. Said testimony was not refuted and thus I find that no effort was made by Respondent to evade any provision of Chapter 468, Florida Statutes. Accordingly, I shall recommend that the complaint filed herein be dismissed in its entirety. The findings of fact found in the above-quoted paragraph were not based upon competent substantial evidence. The competent substantial evidence supports a finding that the respondent, Stephen J. Borovina, did not supervise the project and that Borovina evaded the provisions of Chapter 468, Florida Statutes. The following evidence supports the Board's position: There was no written agreement entered into between Howard North and the respondent which indicated that the respondent was to supervise the construction of the Csobors' house (T- 14); It was conceded at the hearing that the only subcontractors or draftmen who worked on the Csobors' house were contracted solely by Howard North and they had no contract whatsoever with the respondent (T-19, 25); The respondent never advised or informed Mr. and Mrs. Csobor that he was the contractor on the job. (T-51); At all times during the act of construction of the house, Mr. and Mrs. Csobor were under the impression that Howard North was the contractor (T-44-51). It is, therefore, ORDERED: That the certification of respondent, Stephen J. Borovina, Number CG 0007016, be and is hereby revoked. Respondent is hereby notified that he has thirty (30) days after the date of the Final Order to appeal pursuant to Chapter 120, Florida Statutes, and the Florida Appellate Rules. Dated this 3rd day of August, 1979. FLORIDA CONSTRUCTION INDUSTRY LICENSING BOARD BY: JOHN HENRY JONES, President

Florida Laws (1) 120.57
# 1
CONSTRUCTION INDUSTRY LICENSING BOARD vs. JAMES W. GEARY, D/B/A FIRST TRIANGLE CORPORATION, 77-000613 (1977)
Division of Administrative Hearings, Florida Number: 77-000613 Latest Update: Sep. 08, 1977

Findings Of Fact Upon consideration of the oral and documentary evidence adduced at the hearing, the following relevant facts are found: Respondent James W. Geary presently holds certified general contractor's license number CG C005775. Respondent Geary apparently entered into a contract with Phillip Smith to add a screened porch to the Smith residence. Neither the contract nor the testimony of Mr. Smith were made available to the undersigned Hearing Officer. Respondent had difficulty obtaining a roofer and completion of the project was therefore delayed. During the interim, the interior of the Smith's living room suffered water damage. After receiving a complaint from the Smiths, Mr. Robert Jahn, Chief Building Official for the City of Tamarac, personally inspected the Smith project. He found that the water damage was caused by the uncompleted work of respondent and certain violations of the Southern Florida Building Code. Jahn did not know how long the project had not been worked on, but Smith told him he had tried for about one month to get respondent to return to correct the situation. Respondent testified that when he sent a man to the Smith residence to install the roof columns, Smith chased the man off the job. Upon the delivery of certain supplies for his projects, respondent Geary, d/b/a First Triangle Corporation, wrote two checks in the total amount of $391.41 payable to Rinker Materials. (Exhibit 1) These checks were offered for payment by Rinker, and were returned due to insufficient funds. The former credit manager of Rinker Materials did not know whether anyone from Rinker had contacted respondent about the checks. Respondent testified that no one from Rinker had informed him that the checks were dishonored. However, respondent did receive notice from his bank that the checks had been returned. He was changing banks about the same time and felt that the bank had made mistakes in the past. He felt that the checks were good when issued and he therefore did not put much reliance upon the notices received from the bank. Respondent testified that he is ready, willing and able to honor the checks written to Rinker Materials. Respondent Geary apparently entered into a contract with Richard Decker for the addition of a five by eleven foot bathroom to the Decker's residence. Neither the contract, the plans or specifications nor the testimony of Mr. Decker were offered into evidence at the Hearing. Respondent felt there were no deviations between the finished product and the job specifications, and that, even if there had been, there was no way he could put a five foot vanity into the project without violating the applicable building code. The field investigator for petitioner's District No. 10 found deviations from the plans with regard to the size of the vanity, the bathroom door and the illumination. He found that the Deckers had not indicated their approval of such deviations by placing their initials on the plans or specification. The South Florida Building Code (302.2(b)) provides that when the cost of a job is over $5,000.00, the permit applicant must present plans signed and sealed by a registered architect or engineer. A larger permit fee is also required for jobs costing over $5,000.00. On or about April 9, 1976, respondent Geary applied to the City of Tamarac for two building permits. (Exhibit 2). While blueprints were submitted, no plans signed and sealed by a registered architect Or engineer were submitted. From the square footages contained on the right hand column of the application, Chief Building Official Jahn determined that the value of the two projects were $7,300.00 and $6,620.00. The contract prices for these projects were approximately $8,000.00 and $10,000.00. There was no conclusive testimony as to who supplied the footage information on these applications, It was respondent's opinion that the actual costs of these projects did not exceed $5,000.00. Respondent apparently entered into a contract with Daniel Salzman for some project, and then entered into a second contract for the construction and installation of a fence and a trellis. For this second project, respondent received a deposit of $825.00. The first job was never completed by respondent and respondent never began work on the fence and trellis project. Respondent admitted that some $500.00 was due Mr. Salzman as a refund for the second project. He testified that he instructed Mr. Salzman to have the work on the first project completed by someone else and then to send respondent the bill for the same. Respondent has not heard from Salzman regarding this matter. By letter dated November 20, 1976, Chief Building Official Jahn notified respondent that "No further building permits [would] be issued to First Triangle Builders with you as their qualifier because of numerous complaints and unfinished projects." As indicated in the Introduction, petitioner filed an administrative complaint against respondent seeking to revoke his license for violations of certain ordinances and Florida Statutes S468.112(2). The cause was referred to the Division of Administrative Hearings for the appointment of a Hearing Officer, and the undersigned was designated to conduct the hearing.

Recommendation Based upon the findings of fact and conclusions of law recited above, as well as the seriousness of the offenses of which respondent has been found guilty, It Is recommended that respondent's certified general contractor's license number CG C005775 be revoked. Respectfully submitted and entered this 18th day of July, 1977, in Tallahassee, Florida. DIANE D. TREMOR Hearing Officer Division of Administrative Hearings Room 530 Carlton Building Tallahassee, Florida 32304 (488-9675) Area Code 904 COPIES FURNISHED: Barry Sinoff, Esquire 1010 Blackstone Building Jacksonville, Florida 32202 Mr. James W. Geary 4370 Northwest 32nd Court Lauderdale Lakes, Florida Wallace Norman Construction Industry Licensing Board 305 South Andrews Avenue Ft. Lauderdale, Florida 33301 J. K. Linnan, Executive Director Construction Industry Licensing Board Post Office Box 8621 JacksonvIlle, Florida 32211

# 2
CONSTRUCTION INDUSTRY LICENSING BOARD vs DANIEL FRANK MOLINARI, 94-005259 (1994)
Division of Administrative Hearings, Florida Filed:West Palm Beach, Florida Sep. 22, 1994 Number: 94-005259 Latest Update: Mar. 20, 1997

Findings Of Fact At all times material hereto, Daniel Frank Molinari (Respondent) was a certified plumbing contractor, being licensed by the Florida Construction Industry Licensing Board (CILB) and having been issued license numbers CF C021437 and CF C041671. On or about March 20, 1990, the State Attorney of Dade County, Florida charged Respondent by Information with an attempted offense against intellectual property in violation of Sections 815.04(3) and 777.04, Florida Statutes, a misdemeanor: "[Respondent] on the 19th day of February 1990 . . . willfully, knowingly, without authorization, attempt to disclose or take data, programs, or supporting documentation, to wit: The CONTENTS of a CONTRACTOR'S LICENSING EXAMINATION, which is confidential as provided by law, residing or existing internal or external to a computer, computer system, or computer network. . ." On or about July 30, 1990, Respondent pled nolo contendere to the misdemeanor charge. Based upon Respondent's plea of nolo contendere, the Dade County Judge entered a judgement finding Respondent guilty as charged, withholding adjudication and imposing costs in the amount of $300.00. In the Dade County judicial circuit, a judge usually makes a finding of guilt when a defendant pleads nolo contendere even if adjudication is withheld. Typically, items in a CILB examination are reused on subsequent exams. However, each examination must contain a certain percentage of new items. Because of Respondent's attempted act, the CILB considered the items on the contractors examination in 1990 to be compromised and, therefore, unusable for subsequent examinations. The 1990 CILB examination consisted of two hundred and twenty-one (221) items. Consequently, 221 new items had to be developed at a cost of approximately $100.00 per item. On or about June 10, 1993, Respondent submitted to the CILB a Certification Change of Status Application (Application) to activate his inactive certified plumbing contractor license (license number CF C041671). Question 7(H) of the Application inquired whether Respondent had ever "Been found guilty of any crime other than a traffic violation". He responded "no" to the question. The Application required an affirmation, and Respondent so affirmed, that "these statements are true and correct and I recognize that providing false information may result in a fine, suspension, or revocation of my contractor's license." Respondent's request for activation could have been denied if he had responded "yes" to question 7(H) of the Application.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Construction Industry Licensing Board enter a final order: Dismissing Count II of the administrative complaint in DOAH Case No. 94-5259; Dismissing all counts of the administrative complaint in DOAH Case No. 95-0199; Revoking Respondent's licenses; Imposing costs for the investigation and prosecution to be determined by the construction Industry Licensing Board. DONE AND ENTERED this 29th day of August, 1995, in Tallahassee, Leon County, Florida. ERROL H. POWELL Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 29th day of August, 1995.

Florida Laws (4) 120.57489.129777.04815.04
# 3
CONSTRUCTION INDUSTRY LICENSING BOARD vs. GEORGE SOLER, 84-002529 (1984)
Division of Administrative Hearings, Florida Number: 84-002529 Latest Update: Feb. 06, 1986

Findings Of Fact At all times material to this proceeding Respondent was a registered building contractor in the State of Florida having been issued license number RB 0009164. At no time material to this proceeding was Domingo Alonzo (a/k/a Domingo Alonzo) registered, certified or otherwise licensed by the Florida Construction Industry Licensing Board. Respondent and Alonzo signed and submitted a proposal to Myron M. Gold and Roberta Fox for remodeling and additions to their residence located at 1550 Zuleta Avenue, Coral Gables, Florida in accordance with plans prepared by Frese - Camner Associates on file with the City of Coral Gables, Florida, File No. 2897 for a contract price of $65,940.00 with draw schedules attached. On December 6, 1982, Myron M. Gold and Roberta Fox (Homeowners) accepted the Proposal (Contract). On December 6, 1982, the Homeowners paid Respondent and Alonzo jointly $3,297.00 in accordance with the contract whereby they were to receive 5 percent of the contract amount as a down payment upon signing. The draw schedule provided for a 10 percent retainage from each draw which was to be paid to Respondent and Alonzo upon completion and the issuance of a certificate of occupancy. On December 21, 1982 the Homeowners paid Respondent and Alonzo jointly $2,025.00 which represented a draw on Schedule I - Item 3 for $1,350.00, Schedule II - Item 2 for $360.00 and Item 5 for $315.00. On December 17, 1982 the Homeowners and Respondent filed the affidavit required by ordinance with the City of Coral Gables for the purpose of having a building permit issued covering the work under the contract. 9. On January 19, 1983 Respondent using his building contractors license applied for building permit to cover the work anticipated under the contract and on the same day was issued building permit, No. 28214. Under the contract the Homeowners were to pay for the building permit and the bond required by the city. On January 26, 1983 the Homeowners paid Respondent and Alonzo jointly $3,000.00 which along with a payment on January 27, 1983 of $500.00 and January 31, 1983 of $544.60 represented a draw on Schedule I - Item 2 for $405.00, Item 5 for $1,260.00, Item 6 for $1,547.10 and Item 13 for $832.50. All payments from December 6, 1982 through January 31, 1983 under the contract by the Homeowners totaled $9,366.50 and were paid jointly to Respondent and Alonzo. On February 4, 1983 Respondent and Alonzo entered into an agreement, prepared by Myron Gold in the law office of Gold and Fox, whereby the Homeowners were to pay the balance of the funds remaining under the contract to Alonzo individually. After this date all payments were made to Alonzo. It was the Homeowners understanding after the February 3, 1983 agreement that Respondent would still be responsible for the supervision of the construction although they never saw Respondent again until October 1983. Edward Borysiewicz testified that he dealt with Respondent during March 1983 when he made the floor slab inspection on March 3, 1983 and the columns inspection on March 14, 1983. The record is clear that shortly after the agreement on February 3, 1983 Respondent no longer came to the construction site and supervised the work of Alonzo. On February 8, 1983 the Homeowners paid Alonzo $3,060.00 which represented a draw on Schedule I - Item 1 for $810.00, Item 5 for $1,417.50 and Item 13 for $832.50. On February 28, 1983 the Homeowners paid Alonzo $3,155.40 which represented a draw on Schedule I - Item 4 for $1,705.50 and $729.90 for extras apparently not covered by the contract but whether the balance of check No. 1161 (Pet. Ex. 13) of $720.00 was for payment under the contract or for extras is not shown in Petitioner's Exhibit No. 15. On March 18, 1983 the Homeowners paid Alonzo $1,000 which represented a draw on Schedule I - Item 9 for $819.00. Again whether the balance of check No. 1206 (Petitioner's Exhibit No. 13) of $181.00 is for payment under the contract or for extras is not shown in Petitioner's Exhibit No. 15. On March 21, 1983, the Homeowners paid Alonzo $6,400.00 which represented a draw on Schedule I - Items 10, 11, 12, 14 and 15. On March 21, 1983 the Homeowners paid Alonzo $2,166.90 but Petitioner's Exhibit No. 15 does not list check No. 1210 as being a payment under the contract or for extras. On March 31, 1983 the Homeowners paid Alonzo $4,230.00 which represents a draw under Schedule I - Item 7 for $2,520.00 and a payment for extras not covered under the contract in the amount of $1,710.00. On April 21, 1983 the Homeowners paid Alonzo $5,207.40 which represented a draw Schedule I - Items 1, 5, 6, 9 and 14. On June 24, 1983 the Homeowners paid Alonzo $5,788.00 which represented a draw on Schedule I - Item 12 for $667.00, Item 14 for $3,024.00 and payment for extras not under contract for $2,097.00. After March 14, 1983 Respondent was not seen on the job site and there was no longer any apparent supervision of Alonzo by Respondent. After Respondent left the job site there was no licensed building contractor involved in the construction. After Respondent left the construction site the Homeowners soon realized that Alonzo did not know how to proceed with the work and experienced problems with the pace and manner in which the work was being accomplished. On July, 1983, Alonzo stopped working altogether. Although the Homeowners were aware of the problems that Alonzo was having with the construction and that Respondent was not on the job, the record does not reflect that they ever attempted to contact Respondent after the meeting on February 3, 1983. On August 1, 1983 the Homeowners notified Respondent and Alonzo that the contract had been terminated. The Homeowners paid Respondent and Alonzo $42,174.20 total under the contract (pages 1-5, Petitioner's Exhibit No. 15) and paid Alonzo $10,766.37 for extras (Pages 6- 10, Petitioner's Exhibit No. 15). On August 31, 1983 the Homeowners paid Edward Bryant, plastering contractor the sum of $3,100.00 for plastering performed by Edward Bryant. This was for work under the contract that had not been completed or work necessary to correct problems that were already completed. Roberta Fox testified that there were no extras on plaster, however, page 7, line 11 and page 9, line 21 of Petitioner's Exhibit 15 indicates that there was extra plastering. On August 29, 1983 and September 29, 1983 the Homeowners paid Southwest Plumbing Services, Inc. the total amount of $4,875.00 for work contemplated under the contract that had not been completed or needed correction. Homeowners had paid Alonzo $3,591.00 for plumbing under the contract. Both Alonzo and Southwest Plumbing, Inc. were paid for extra plumbing not covered by the contract in the amount of $567.00 and $391.50, respectively by the Homeowners. From September 13, 1983 through June 13, 1984 the Homeowners paid Charles Brueg, Jim Brueg, Charles Buffington and Dan, Inc. the total amount of $4,192.91 for electrical work contemplated under the contract that was not completed or required correction after Alonzo left the construction site. Page 6 lines 6 and 11 of Petitioner's Exhibit No. 15 indicate that there were extras not covered by the contract. The total amount for electricity contemplated by the contract was $3,649.00. Alonzo was paid $2,627.10 under the contract and $1,710.00 for extras. The Homeowners were required to obtain the services of an air conditioning contractor to complete the work contemplated under the contract after Alonzo left the job site and as a result were required to pay Cameron, Inc., the air conditioning contract the amount of $5,181.60 between August 16, 1983 and January 24, 1984. The total amount contemplated under the contract was $3,600.00 of which $1,134.00 had been paid to Alonzo. Debris was dumped in the swimming pool requiring the Homeowners to pay $7,000 to refurbish the swimming pool. This amount included the repair contemplated under the contract and the extra work caused by Alonzo. The contract contemplated $2,300.00 for repairs of which none had been paid to Respondent or Alonzo. The Homeowners paid $1,150.00 to a painting contractor to finish the painting contemplated under the contract. Alonzo had been paid $1,125.00 for painting. (Petitioner's Exhibit No. 15) The contract provided $2,500.00 for all painting required under the contract. Respondent failed to notify the building department that he was no longer responsible for the construction. After the Homeowners terminated the contract due to Respondent's and Alonzo's nonperformance, the Homeowners had to expend a substantial amount of extra money to complete the construction. The evidence is insufficient to determine an exact or approximate amount. Roberta Fox's testimony was conflicting with regard to her understanding as to whether or not the Respondent would continue to supervise the construction after the meeting in the Homeowners' law office on February 3, 1983 when Respondent and Alonzo entered into this agreement. Myron Gold testified that it was his understanding that Respondent would continue to supervise Alonzo after the agreement. However, the Homeowners action in this regard subsequent to February 3, 1983, in making no effort to bring the matter to a "head" and requiring Respondent to supervise the work or terminate the contract and in continuing to deal with Alonzo although Homeowners were aware shortly after February 3, 1983 that Alonzo could not perform without Respondent's supervision and that they knew Respondent was not on the job, tends to show that they were aware or should have been aware that Respondent was no longer involved in the day to day supervision of the construction. Alonzo installed a fireplace pursuant to the contract that the building department determined to be a fire hazard and recommended against its use. The Homeowners applied for and were granted a "owner/builder" permit on September 1, 1983 and requested cancellation of the building permit issued to Respondent which was cancelled on September 6, 1983. They have not received a certificate of occupancy because the building department has not performed the following inspection: electrical final; plumbing final; air conditioning final; roofing final and public works final. The building department would have issued a "stop-work order" had it been aware that Respondent was not supervising the construction and would have required the Homeowners to obtain another licensed building contractor or proceed as a owner/builder. The plans prepared by Frese-Camner Associates that were made a part of the contract by reference were not introduced into evidence with the contract and thus the record is insufficient to determine what was required to meet the specifications of the plans and thereby determine if the specifications had been met. There was a permit issued for the septic tank and drain field which work was started in December, 1982. The construction of the house itself was started in January 1983. The first inspection (foundation) on the house was made by the building department of January 21, 1983.

Recommendation Based on the findings of fact and conclusions of law recited herein, it is Recommended that the Board enter a final order finding Respondent guilty of violating Section 489.129(1)(h)(k)(m), Florida Statutes (1981) and for such violations it is Recommended that the Board assess the Respondent with an administrative fine of $500.00 and suspend the Respondent's contracting license for a period of three (3) years, provided, however, that if Respondent submits to the Board competent and substantial evidence of restitution to Myron Gold and Roberta Fox within one (1) year from the date of the final order herein, then the suspension shall be stayed and Respondent placed on probation for the balance of the suspension. Respectfully submitted and entered this 6th day of February, 1986, in Tallahassee, Florida. WILLIAM R. CAVE Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 6th day of February, 1986. APPENDIX TO RECOMMENDED ORDER IN CASE NO. 84-2529 The following constitutes my specific rulings pursuant to Section 120.59(2), Florida Statutes, on all of the proposed findings of fact submitted by the parties to this case. RULINGS ON PROPOSED FINDINGS OF FACT SUBMITTED BY THE PETITIONER: Adopted in Finding of Fact 1. Adopted in Finding of Fact 2. Adopted in Finding of Fact 3 but clarified. Adopted in Findings of Fact 4 and 5. Adopted in Finding of Fact 4. Adopted in Finding of Fact 6. Adopted in Finding of Fact 5. Adopted in Finding of Fact 9. Adopted in Finding of Fact 9. Adopted in Finding of Fact 9. Adopted in Finding of Fact 9. Adopted in Finding of Fact 10. Adopted in Finding of Fact 11. Adopted in Finding of Fact 12 except clarified as to the last date on construction site. Adopted in Finding of Fact 13. Adopted in Finding of Fact 14 but clarified. Adopted in Finding of Fact 15 but clarified. Adopted in Finding of Fact 16. Adopted in Finding of Fact 17 but clarified. Adopted in Finding of Fact 15 but clarified. Adopted in Finding of Fact 19. Adopted in Finding of Fact 20 but clarified. Adopted in Finding of Fact 21. Adopted in Finding of Fact 11. Adopted in Finding of Fact 21. Adopted in Finding of Fact 22. Adopted in Findings of Fact 22 and 23. Adopted in Finding of Fact24 but clarified to show correct amount paid under contract as indicated by Petitioner's Exhibit 15. Adopted in Finding of Fact 25 but clarified to show that extra plastering not under contract was required. Adopted in Finding of Fact 26. Adopted in Finding of Fact 26. Adopted in Finding of Fact 26. Adopted in Finding of Fact 27. Adopted in Finding of Fact 27. Adopted in Finding of Fact 27. Adopted in Finding of Fact 27. Adopted in Finding of Fact 27. Adopted in Finding of Fact 27. Adopted in Finding of Fact 28. Adopted in Finding of Fact 28. Adopted in Finding of Fact 28. Adopted in Finding of Fact 28. Adopted in Finding of Fact 29 but clarified. Adopted in Finding of Fact 30 but clarified. Rejected as immaterial. Rejected as not supported by competent substantial evidence. Rejected as not supported by substantial competent evidence. Adopted in Finding of Fact 31. Rejected as immaterial. Adopted in Finding of Fact 32 but clarified to show that the record does not support a figure that approximate $32,000.00. Rejected as not supported by substantial competent evidence even though the Homeowners' testimony supported this fact because the Homeowners' actions with regard to Respondent after February 3, 1983, was to the contrary. Adopted in Finding of Fact 33. Adopted in Finding of Fact 34. Adopted in Finding of Fact 34. Adopted in Finding of Fact 34. Adopted in Finding of Fact 35. Adopted in Finding of Fact 36. Adopted in Finding of Fact 36. RULINGS ON PROPOSED FINDINGS OF FACT SUBMITTED BY RESPONDENT: No Findings of Fact was submitted by the Respondent. COPIES FURNISHED: James Linnan, Executive Director Department of Professional Regulation Construction Industry Licensing Board Post Office Box 2 Jacksonville, Florida 32202 Fred Roche, Secretary Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 Salvatore A. Carpino, General Counsel Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 W. Douglas Beason Esquire Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 Mr. George J. Soler, Pro Se 3315 S.W. 96th Avenue Miami, Florida 33165

Florida Laws (6) 120.57155.40489.105489.113489.127489.129
# 4
CONSTRUCTION INDUSTRY LICENSING BOARD vs. JOSEPH R. KENNEDY, 85-000377 (1985)
Division of Administrative Hearings, Florida Number: 85-000377 Latest Update: Jul. 09, 1985

The Issue The issues in this cause are those promoted by the filing of an Administrative Complaint by the Department of Professional Regulation accusing the Respondent of various violations of Chapter 489, Florida Statutes. Should the Respondent be found guilty, this action contemplates the imposition of a penalty against Respondent's license as a commercial pool contractor in Florida.

Findings Of Fact 1. Respondent, at all times relevant to this inquiry, was a registered commercial pool contractor having been issued license number RP0041725. This is a license issued by the Florida Construction Industry Licensing Board. 2..On November 18, 1983, Respondent entered into a contract under the name Kennedy Pool and Construction Co., an entity for whom Respondent serves as a qualifying agent in the commercial pool contracting business. This contract was with one Marie Robertson; however, the contract was not for the purpose of construction of a pool. It was for construction of a 20' by 24' block garage. This structure was to be free-standing and would be located adjacent to Ms. Robertson's residence, which is also used in her business. Petitioner's exhibit number 2 is a copy of the contract and reflects the $4,800.00 contract price. Robertson has paid the full amount of the contract and the garage construction was completed in January, 1984. Respondent personally built the garage. Respondent built the garage without obtaining a building permit from the City of Jacksonville, Florida. Respondent also failed to submit plans and specifications to the City of Jacksonville, which set forth the design and placement of this garage structure. Having failed to request a permit or to submit plans and specifications, Respondent made no request of the City of Jacksonville Building Department to inspect the construction related to the garage. Finally, Respondent in his licensure with the State of Florida, and license recognition with the City of Jacksonville, was not authorized to serve as a building contractor engaging in the construction of structures such as the garage in question. The project at issue entailed the pouring of a foundation; the erection of block walls the erection of a roof truss system and the installation of a roof covering of shingles. All of these items were beyond the license recognition which respondent held with the State of Florida and the City of Jacksonville. When the City of Jacksonville discovered the existence of the garage, it made the owner aware that the structure was in violation of the City of Jacksonville Building Code related to the need for obtaining a building permit, and the fact that the garage structure violated the city's set-back requirement. This later item pertained to the fact that given the commercial utilization of the property, on the part of Ms. Robertson, the garage was too close to the city street. As a consequence, Robertson was put to the inconvenience of obtaining and paying for a building permit and gaining a variance from the set-back requirements mentioned. Had the City of Jacksonville been presented with building plans and specifications, this would have alerted the city to the fact that the placement of the garage was too close to the street. When confronted with her difficulty, Ms. Robertson contacted the Respondent to gain his assistance in obtaining a building permit. The Respondent indicated that it was her problem and said that he could not get a permit because the property was business property and not private property. The Respondent was charged by the City of Jacksonville through a notice of violation of local zoning requirements related to the failure to obtain a building permit and the fact that the Respondent was not licensed by the City of Jacksonville to construct a garage at the Robertson residence. Attempts at serving the violations were not successful in that calls to the Respondent and issuance of notice of violations through certified mail, return receipt requested, were not acknowledged by the Respondent.

Florida Laws (4) 120.57489.105489.117489.129
# 5
CONSTRUCTION INDUSTRY LICENSING BOARD vs. PHILLIP H. BARE, D/B/A AMERICAN GENERAL CORPORATION, 78-000593 (1978)
Division of Administrative Hearings, Florida Number: 78-000593 Latest Update: Jun. 29, 1979

The Issue Whether Respondent's registration as a general contractor should be suspended or revoked, or the respondent otherwise disciplined, for alleged violations of Sections 468.112 (2)(a), (2)(g), and (2)(h), Florida Statutes, as set forth in the Administrative Complaint.

Findings Of Fact Petitioner Phillip H. Bare, Ocala, Florida, is registered with Respondent as a general contractor under the provisions of Chapter 468, Florida Statutes, and was so registered throughout the year of 1977. He operates under the name of American General Corporation of Florida, but that firm has not been qualified to engage in the contracting business in Florida, pursuant to Section 468.107, Florida Statutes. (Petitioner's Exhibits 1, 2, Stipulation, Testimony of Cherry) On August 15, 1977, Respondent, as president of American General Corporation of Florida, entered into a Home Improvement Installment Contract and Note with Joe Wheeler and wife, who reside at Route 2, Box 63, Live Oak, Florida. The contract provided that for a price of $4,250 Respondent would make the following property improvements on the Wheeler residence: Build 12 X 20 Room Addition and finish with paneling, ceiling tile, & all trim. Build 6 X 14 porch with top. Replace all Rotten sills. Replace all Rotten siding. Paint house with latex paint. Repair floor joist. The Wheelers made a down payment of $350 leaving an unpaid balance of $3,900. The promissory note provided for a total financed cost of $6,629.28 payable in monthly payments over a period of seven years. On August 29, 1977, the parties entered into another such contract for additional work to the residence for the price of $1,600 as follows: Install ceiling tile in (2) bed rooms and bathroom complete with trim. Install paneling in (2) bed rooms complete. Install paneling and tile board in bath. Remove old shingles and install new 235lb asphalt shingles. Install 54" kitchen sink complete and hook to water. The Wheelers paid $100 as a down payment on the work and financed the remainder with a total deferred price of $2,100 payable in 48 consecutive monthly installments. (Petitioner's Exhibits 5, 6, Testimony of E. Wheeler, J. Wheeler) Respondent subcontracted the work on the Wheeler residence to one John Compton. Respondent did not secure a Suwannee County Building Permit for the work, nor was he licensed in that county to act in the capacity of a contractor. (Testimony of Respondent, Wilson) On September 12, 1977, Mr. Wheeler signed a Customer's Completion Certificate" wherein he acknowledged that the contract work had been satisfactorily completed. Although Respondent testified that he explained the contents of the document to Wheeler at the time it was executed, Wheeler denied the same and testified that he had not read its contents prior to signing it. (Testimony of Respondent, J. Wheeler, Respondent's Exhibit 1) Prior to completion of the work, the Wheelers noted that certain deficiencies in the work existed, including a floor that "shaked" in the new addition, looseness of wall paneling, failure to replace rotten siding and lower sills, and failure to install ceiling tile in one bedroom. They spoke to workmen on the job who said that they would return and finish the work. However, nothing further was done in spite of the fact that Respondent told Mrs. Wheeler in a telephone conversation that he would be back to complete the job. As a result, Mrs. Wheeler made a complaint to Derl W. Wilson, the building official for Suwannee County. (Testimony of E. Wheeler, J. Wheeler, Wilson) Pursuant to Mrs. Wheeler's complaint, Wilson inspected the premises at some time during the month of September, 1977, and observed that the accomplished work was of a substandard nature involving various violations of the Southern Standard Building Code which had been adopted by Suwannee County in 1975. These violations, which Respondent acknowledged at the hearing to have been committed, included the following: concrete foundation blocks improperly aligned and unsupported by required concrete pad; improper spacing of floor joists at 24 inch rather required 16 inch intervals; use of one-ply instead of two-ply flooring material; failure to extend vent stack for plumbing system in kitchen to a height of 6 inches above the roof line; failure to provide a shutoff valve for cold water line under kitchen sink; failure to cover and protect splices in wiring of ceiling light fixture; failure to install ridge board for support of roof rafters; improperly installing two inch by four inch wood braces in attic; failure to connect sewer line to septic tank. Additionally, Wilson observed various instances of poor workmanship in installation of an electric wall receptacle and connection of the roof of the new addition to the existing building. Further, he noted that due to the improper spacing of floor joists, the substandard plywood flooring was not firm and constituted a safety hazard. (Testimony of Wilson, Petitioner's Composite Exhibit 3) After his inspection, Wilson wrote a letter to Respondent, dated October 18, 1977, pointing out the deficiencies in construction and advising that a complaint would be filed against him unless a building permit was obtained within ten days and the necessary corrections of deficiencies were made. Although Wilson testified that he did not hear from Respondent as a result of the letter, Respondent made several telephone calls to Wilson's office and was informed that he was on vacation. (Testimony of Wilson, Respondent, Respondent's Exhibit 7) On June 14, 1978, Respondent entered a plea of guilty in the County Court of Suwannee County, Florida to a charge of improper construction arising out of the Wheeler contract, and the Court withheld adjudication of guilt in the matter. (Petitioner's Exhibit 9) Respondent was previously convicted in the County Court of Putnam County, Florida, on August 13, 1974 of engaging in the business or acting in capacity of a contractor without being duly registered in the county pursuant to Section 468.105(2), Florida Statutes. On June 16, 1975, Respondent pleaded nolo contendere in the County Court of Alachua County, Florida to a charge arising out of his activities as a home improvement contractor. The Court withheld adjudication of guilt and placed the Respondent on probation for a period of six months and required that he "make necessary repairs to home of victim to satisfaction of Consumer Protection Section of State Attorney's Office, Eighth Judicial Circuit." (Petitioner's Exhibits 7-9) Petitioner has been a building contractor for twelve years. He testified that his subcontractor for the Wheeler job had been competent in the past and he relied on this fact in not closely inspecting the work under the Wheeler contracts. For this reason, he was unaware that the building code violations had occurred until after he had sold the Wheeler contracts and mortgages to a third party who was contacted by the Wheelers regarding the deficiencies. Respondent denied that he abandoned the work because he thought it had been completed until subsequent notification of the Wheeler complaint. He has since made attempts through Counsel to resolve the complaint by having the work performed by a contractor licensed in Suwannee County or by means of a monetary settlement. He further testified that he had inquired of Petitioner's office as to the necessity for obtaining a Suwannee County license prior to commencing the Wheeler contracts and was informed that his registration was valid for work in that county. He acknowledged that he made a "mistake" in not obtaining a building permit and in failing to supervise his subcontractor properly, but stated that the licensing rules in the various counties were "confusing." As to his prior difficulties in Putnam and Alachua Counties, Respondent testified that the Alachua matter involved a complaint raised four or five years after construction regarding quality of workmanship and that he had taken care of the matter. As to the Putnam County case, he testified that he was unaware that a building permit was necessary at the time he did the work for which he was subsequently prosecuted. It is found that Respondent's exculpatory testimony regarding his failure to obtain a building permit or county licensing, and lack of knowledge of code violations with respect to the work performed at the Wheeler residence is not credible. (Testimony of Respondent, Respondent's Exhibits 2-6)

Recommendation That Respondent's registration as a general contractor be suspended for a period of one year and that an administrative penalty in the amount of $500 be imposed, for violation of Section 468.112(2)(a), Florida Statutes. DONE and ENTERED this 23rd day of March, 1979, in Tallahassee, Florida. THOMAS C. OLDHAM Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 23rd day of March, 1979. COPIES FURNISHED: Barry Sinoff, Esquire 2400 Independent Square Jacksonville, Florida 32202 C. Valentine Bates, Esquire 726 NW 8th Avenue - Suite B Gainesville, Florida J. K. Linnan, Executive Director Florida Construction Industry Licensing Board Post Office Box 8621

# 6
CONSTRUCTION INDUSTRY LICENSING BOARD vs. DAVID R. KNIGHT, 84-003836 (1984)
Division of Administrative Hearings, Florida Number: 84-003836 Latest Update: Jan. 09, 1986

Findings Of Fact At all times material to these proceedings, the Respondent, David R. Knight, held a registered general contractor's license numbered RG 007907 issued by the State of Florida, Department of Professional Regulation, Construction Industry Licensing Board initially in July, 1968. Respondent's license is presently in an inactive status for failure to renew but renewal can be accomplished by Respondent paying the required renewal fee only. On May 13, 1983, Respondent contracted with Joseph Cobb to remodel a house in Milton, Florida. The contract price was $23,800.00. The Respondent began the remodeling and when the project was approximately 50 percent completed, left the site. Joseph Cobb, on numerous occasions, offered to work with the Respondent in any way to finish the project, but the Respondent failed to return. Joseph Cobb paid Respondent $19,100.00 from May 14, 1983 through June 23, 1983. In addition, although the contract required Respondent to pay for all supplies and materials, Cobb paid $2,300.98 for supplies and material used in the remodeling. Respondent failed to pay Gary Rich Plumbing for the plumbing work done on the Cobb residence. Joseph Cobb was forced to pay Gary Rich $1,200.00 in order to avoid a lien being filed on his home. Respondent was not licensed to contract in Milton, Santa Rosa County, Florida, when he contracted with Joseph Cobb to perform remodeling. In June, 1982, Respondent contracted with Pearlie Rutledge to remodel a house at 608 North D Street, Pensacola, Florida, Escambia County. The contract price was $17,000.00. The Respondent began the construction without obtaining a building permit which is in violation of Section 106 Standard Building Code as adopted by the City of Pensacola Ordinance 81-83. Respondent deliberately and in a hurry left the site of construction when the building inspector appeared on the job. The Respondent was not licensed in Escambia County or the City of Pensacola to practice contracting. Pearlie Rutledge paid Respondent $5,000.00 which the Respondent failed to return when the remodeling was stopped by Charles Humphreys, Housing Inspector for the City of Pensacola. Pearlie Rutledge obtained a Final Judgement against the Respondent for $4,557.00 which has not been paid by the Respondent. Respondent's "81-82' and "82-83", Okaloosa County Occupational License was issued to David Knight doing business as "Your Way Construction." However, there was no evidence presented at the hearing that Respondent ever contracted in the name of "Your Way Construction." In fact there is evidence that during the year 1983 he contracted with Cobb as David Knight, General Contractor and not as David Knight, General Contractor, d/b/a Your Way Construction. (See Petitioner's Exhibit No. 1.)

Recommendation Based upon the findings of fact and conclusions of law recited herein, it is RECOMMENDED that the Board enter a final order Dismissing Counts II, V and VI of the Administrative Complaint filed against the Respondent. It is further RECOMMENDED that the Board enter a final order finding Respondents guilty of the violation charged in Counts I, III and IV of the Administrative Complaint filed against the Respondent and for such violation it is RECOMMENDED that the Board revoke the Respondent's registered general contractor's license numbered RG 0007907, to practice contracting in the State of Florida Respectfully submitted and entered this 9th day of January, 1986, in Tallahassee, Leon County, Florida. WILLIAM R. CAVE Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 FILED with the Clerk of the Division of Administrative Hearings this 9th day of January, 1986. APPENDIX TO RECOMMENDED ORDER IN CASE NO. 84-3836 The following constitutes my specific rulings pursuant to Section 120.59(2), Florida Statutes, on all of the Proposed Findings of Fact submitted by the Petitioner to this case. Rulings on Proposed Findings of Fact Submitted by the Petitioner Adopted in Finding of Fact 1. Exhibit 1). 3. Adopted in Finding of Fact 3. 4. Adopted in Finding of Fact 4. 5. Adopted in Finding of Fact 5. 6. Adopted in Finding of Fact 6. 7. Adopted in Finding of Fact 7. 8. Adopted in Finding of Fact 8. 9. Adopted in Finding of Fact 9. 10. Adopted in Finding of Fact 10. 11. Adopted in Finding of Fact 11. 12. Adopted in Finding of Fact 12. Adopted in Finding of Fact 2 except for contract amount which should have been $23,800. (See Petitioner's Respondent Did Not Submit Any Proposed Findings of Fact COPIES FURNISHED: James Linnan, Executive Director Department of Professional Regulation Construction Industry Licensing Post Office Box 2 Jacksonville, Florida 32202 Charles F. Tunnicliff, Esquire Department of Professional Regulation 130 North Monroe Street Tallahassee Florida 32301 Fred Roche, Secretary Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 Salvatore A. Carpino, General Counsel Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 Mr. David R. Knight 1215 East Hayes Street Pensacola, Florida 32503

Florida Laws (4) 120.57489.117489.119489.129
# 7
CONSTRUCTION INDUSTRY LICENSING BOARD vs. JOHN N. LAMBERT, D/B/A ALLSTATE HOMECRAFTS, INC., 78-000404 (1978)
Division of Administrative Hearings, Florida Number: 78-000404 Latest Update: Oct. 18, 1979

The Issue Petitioner, Florida construction Industry Licensing Board (hereafter FCILB) seeks to revoke the building contractors license of Respondent, John N. Lambert (hereafter Lambert), on the ground that Lambert willfully or deliberately disregarded and violated applicable building codes of Metropolitan Dade County in violation of Section 468.112(2)(a), Florida Statutes. Initially, Lambert was also charged with abandonment of a construction project in violation of Section 468.112(2)(h), Florida Statutes. However, at the hearing, FCILB abandoned the charge.

Findings Of Fact Lambert is the holder of an inactive building contractors license number CBC009927 which legally qualified Lambert to act for Allstate Homecrafts, Inc., a corporation located in Miami, Florida, engaging in contracting work. Lambert was employed by the corporation but was not an officer or shareholder. On June 10, 1976, Lambert initiated a building permit application for work proposed to be done on the home of Mr. Nelson Tower. Mr. Tower had entered into a contract with Allstate Homecrafts, Inc., on June 4, 1976. The contract reflects that Mr. Neal Phillips acted as a corporate representative and not Lambert. The building permit was issued on August 11, 1976. On July 24, 1976, Allstate Homecrafts, Inc., contracted with a Mr. William Millman, and once again the contract reflects that Neal Phillips was the corporate representative and not Lambert. On September 13, 1976, and again on September 30, 1976, Lambert made application for a building permit with she City of Coral Gables, Florida, for the Millman job. Work was commenced on both projects. Work was still in progress on October 26, 1976, when Lambert wrote a letter to FCILB requesting that his qualification as contractor for Allstate Homecrafts, Inc., cease immediately. The reasoning given by Lambert, without further explanation, was that he could "in good conscience no longer comply" with Florida law regarding licensing of construction industry. Lambert further requested in the letter that he be requalified as an individual licensee. On the same date, Lambert terminated his employment with Allstate Homecrafts, Inc. The Tower project continued on until January, 1977, when it was abandoned by Allstate Homecrafts, Inc. The contract price was $30,000.00 and over $25,000.00 in draws were made. Five thousand dollars ($5,000.00) was drawn on November 2, 1977 $5,000.00 wad drawn on November 24, 1976, and $5,000.00 was drawn on December 16, 1976. These occurred after Lambert terminated his relationship with Allstate Homecrafts, Inc. After the contract was abandoned in January, 1977, Tower spent another $23,000.00 to finish the project. The Millman job continued until December, 1976, at which Lire it was abandoned at about 60 percent completion. A $10,000.00 draw was made on November 4, 1976, and a $5,000.00 draw was made on December 2, 1976. Millman spent an additional $10,000.00 to finish the project. Neither Tower nor Millman ever saw Lambert. All monies paid were given to other corporate representatives. While there was some evidence that violations of applicable building codes did occur, there was a complete absence of evidence to establish that Lambert willfully or deliberately disregarded the South Florida Building Code 4501.2(d)(4); failure to correct an electrical hazard. On February 2, 1978, the Dade County Construction Trade Qualifying Board reported that it had found that there was a prima facie showing of the charges brought against Lambert.

# 8
CONSTRUCTION INDUSTRY LICENSING BOARD vs. FRANKLYN GOMEZ, 84-004157 (1984)
Division of Administrative Hearings, Florida Number: 84-004157 Latest Update: Jul. 18, 1985

Findings Of Fact In General: Respondent is, and was at all times material to the Administrative Complaint, a certified general contractor, having been issued license no. CG C016774 by the Florida Construction Industry Licensing Board. At no time material to the Administrative Complaint was Stephen Karlan licensed, registered or certified by the Florida Construction Industry Licensing Board. As to Counts I--III: There is no evidence, direct or indirect, to tie any participation by Stephen Karlan to any event at the Reyes' home (Administrative Complaint Counts I--III). Mrs. Carolyn Reyes is the wife of Augustin Reyes, both of whom have resided at 9355 Southwest 180th Street, Miami, Florida, for approximately 12 years. They first met with Respondent Gomez sometime in July of 1983, and after a series of discussions concerning the work which the Reyes' desired, their budget restrictions, and charges proposed by Respondent, a contract was prepared by Respondent on Respondent's stationery. (P-3) The contracted work included: completely remodeling the kitchen and living room; the installation of central air conditioning and heating; the construction of a swimming pool; and the construction of a covered patio. The Reyes provided Respondent with a check in the amount of $4,227.40, representing a twenty percent down payment on the contract price of $24,237.00. Although signed by Mr. Reyes, who did not testify, Mr. Reyes' signature was identified by Mrs. Reyes on the contract and on the September 20, 1983 check. She was present at the execution of the contract and tendering of the check on the Reyes' joint bank account to Respondent Reyes on September 20, 1983. Existence of this contract and its terms is not disputed by Respondent. Subsequently, approximately $3,100.00 was deducted from the total contract price by way of a change order. This amount represented the cost of installing a roof over the patio and brought the new contract price to $21,137.00. (P-3 and P-6) A change order, prepared by Respondent, and signed by Mrs. Reyes, was agreed to approximately October 18, 1983, for installation of more expensive bronze-tone sliding glass doors in the family room and $250.00 was paid additionally by the Reyes. From September through November, 1983, Respondent performed construction work at the Reyes' residence. Under the terms of the contract, the Reyes provided Respondent with the following amounts, mostly by checks drawn on their joint account and issued over Mrs. Reyes' signature. DATES AMOUNTS September 20, 1983 $ 4,227.40 (20 percent down payment) October 5, 1983 $ 1,056.85 (installation of kitchen cabinets) October 13, 1983 $ 3,170.55 (pool framing inspection) October 24, 1983 $ 250.00 (change order--glass doors) October 25, 1983 $ 2,137.00 (air conditioning equipment) October 28, 1983 $ 2,137.00 (pool gunnited) November 3, 1983 $ 1,056.85 (kitchen remodeling) November 4, 1983 $ 1,056.85 (plumbing payment) November 21, 1983 $ 2,000.00 (kitchen and den) November 23, 1983 $ 1,000.00 (kitchen and den) November 28, 1983 $ 982.00 December 6, 1983 $ 2,137.00 (pool decking) $21,211.50 TOTAL (P-6) All of these checks were cashed by Respondent. During October and November, 1983, work was localized in the kitchen. Mrs. Reyes recalled not being able to use her kitchen for Thanksgiving, 1983. Except for recurring problems of improperly installed tiles, cabinets and appliances, related infra., Respondent completed the bulk of the kitchen remodeling in early December, 1983. Also in early December, 1983, the swimming pool was dug and gunnite was sprayed for the pool. Gunnite is a base of a spray used for installing the concrete bottom of a swimming pool prior to installing further marble-type finishing material, tile, and accouterments. In this same time period, the overhang above the anticipated patio was torn off the existing house by Respondent with the apparent goal of tying the existing roof beams into the new roof. After December 6, 1983, Respondent failed to perform any actual construction at the Reyes' residence until May, 1984. 2/ His crew only worked there one day in December of 1983. Approximately December 20, renegotiation of pool costs and kitchen tile costs were indulged-in by the the participants. The final result was that the Reyes would pay $80.00 more for kitchen tiles and $106.00 more for pool tiles and would be permitted by Respondent to deduct $246.00 from the total owed on the contract to him. Mrs. Reyes purchased the pool materials and paid cash for them rather than turning over any monies to Respondent but she stored them on her property so that the work could go forward. Respondent testified that shortly before that point in time, he realized that he had underestimated the cost of doing the Reyes' job by $6,000.00 to $7,000.00 and attempted to explain to them that having received approximately 90 percent of the contract price, but having not completed that much of the work contracted-for, he would have to do the work as he was able between other jobs in order to stay afloat financially. Respondent's proposal was not initially acceptable to the Reyes and they hired a lawyer who thereafter prohibited Respondent making direct contact with the Reyes. At that time, the following items remained to be completed at the Reyes' residence. The pool tile had not been installed; the pool equipment had not been purchased or installed; the living room windows had not been installed; and the patio roof had not been completed. There were also numerous problems with the quality of the workmanship of the completed items. The kitchen cabinets and the dishwasher were both initially improperly installed. As a result of the Reyes complaining to the Metropolitan Dade County Building and Zoning Department, one of that agency's code enforcement officers, John Delaney, inspected the Reyes' home on April 20, 1984. At that time, Mr. Delaney noted all of the items listed in Paragraph 8 as needing completion and also noted that the patio roof overhang was still exposed to the elements and that the air conditioning unit was only balanced on a concrete slab. Mr. Delaney estimated that at that time the contract work was approximately 55 percent to 60 percent complete. Upon investigation and a record search, Mr. Delaney determined that Respondent had obtained an approved building permit for the construction of the swimming pool and the open beamed porch. (P-13) The building permit did not specify installation of the pool's piping. Likewise the building permit did not specify that Respondent might perform the interior remodeling work. This permit which Respondent did obtain lists, and Respondent's signature acknowledges, that Respondent knew that "unless specifically covered by this permit" separate permits must also be obtained for electrical, plumbing, roofing, and paving and pool, among other items. Upon concluding his investigation, Mr. Delaney felt sufficient evidence existed to charge Respondent with violation of Section 10-22 of the Metropolitan Dade County Code and forwarded his investigative report to the official for the appropriate unincorporated municipality. This report indicates that Respondent also pulled permits for mechanical air conditioning and heating and an electrical permit for the swimming pool. To Mr. Delaney's knowledge, no charges were ever filed by that official against Respondent. 3/ Mr. Delaney conceded that a state certified general contractor such as Respondent can legitimately do pool piping and that the only failure of Respondent was in not pulling the county permit. He indicated that the kitchen work in the Reyes' home would require a special permit because there is electrical and plumbing work in replacing old appliances with new. However, as to the kitchen cabinets he felt it would be permissible for either the general contractor to pull a general permit or for a subcontractor to pull a specialty cabinet permit. By questions on cross-examination of Mr. Delaney, Respondent asserted that no electrical work was done, no switches were moved and his only work was replacement of kitchen cabinets, floor, and acoustical tile but this is in the form of his questions and not sworn testimony. Respondent eventually came back to the Reyes job. He finished the pool in July, 1984. He finished the open beamed roof in October 1984. Respondent's carpenters or subcontracting cabinetmakers Carlos and Hector eventually fixed a kitchen door drawer Mrs. Reyes had complained about. (It was never established what these workers' status was/is.) Despite her general dissatisfaction with the tiles in her kitchen, despite a chipped sink, and despite personally having to explain to the plumber (again the tile setter and plumber's contract or employment relationship with Respondent is unclear) how to install the dishwasher, Mrs. Reyes currently feels 95 percent of the contract work has been completed by Respondent. 4/ She acknowledged that Respondent has provided additional bronze fixtures in her family room by way of mitigation. As to Counts IV--VII: In March, 1982, June Mildred Cooper contracted with one Steve Karlan for the construction of a bathroom addition on a residence located at 4835 Westwood Lakes Drive, Miami, Florida. The contract price was $6,700.00. Steve Karlan is not registered, certified, or otherwise licensed by the Florida Construction Industry Licensing Board. See supra. All oral representations made by Karlan to Mrs. Cooper are total hearsay and excludable, but it is clear that Respondent was never mentioned or otherwise identified during the contract negotiation of Cooper and Karlan. Cooper submitted contract payments directly to Karlan and never paid anything to Respondent. Cooper found Respondent on the job one day and thinks he said something to her like, "I'm the boss," but her memory of the exact language, if any, is vague. Cooper was admittedly not on the premises most of the time the construction was in progress because she repeatedly visited her other residence in Indianapolis for several months at a time. Respondent admits he was approached by Steve Karlan to give an estimate for the bathroom job and they thereafter agreed that Respondent should do the work. Respondent admits Karlan later gave him a piece of paper, probably a tax assessment, showing June Cooper's name as the owner, which Respondent used as the basis for filling out the building permit application which he applied for and received covering the portion of the construction work he did at her Florida residence. At the conclusion of his job, Respondent also executed a waiver-of- mechanic-lien affidavit which did not specify any owner and gave it to Karlan. Gomez never inquired into the relationship between Karlan and Cooper and just assumed Karlan was a relative, probably a son, living at the same address, and initially assumed Karlan had authority to authorize the work because Karlan opened the door to him the first time Respondent came to do the requested estimate. At the time Karlan opened the door to Respondent, some construction was already in progress in the house. Respondent represents that this scenario of obtaining a construction job is so customary in the trade that he never questioned Karlan's statement until Mrs. Cooper ultimately complained about the construction after completion. He recalls meeting her at the house twice during construction, but does not think he told her he was the boss. In mitigation, he represents that he made good on Mrs. Cooper's complaints. Respondent admits he later entered a contract with Steve Karlan as a "salesman" after satisfying Mrs. Cooper but that contract had nothing to do with the Cooper job.

Recommendation Accordingly, upon the foregoing findings of fact and conclusions of law, it is RECOMMENDED: That the Florida Construction Industry Licensing Board enter a final order requiring Respondent to pay a penalty of $1,000.00 and monitoring his license for one year in a probationary status. DONE and ORDERED this 18th day of July, 1985, in Tallahassee, Florida. ELLA JANE P. DAVIS Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 18th day of July, 1985.

Florida Laws (3) 120.57489.119489.129