The Issue The issue is whether proposed regulations for Brevard County manatee protection areas by the Florida Fish and Wildlife Conservation Commission (FWCC), which are amendments to Rule 68C- 22.006, Florida Administrative Code, noticed in the April 20, 2001, Florida Administrative Weekly (F.A.W.)("Proposed Rule"), with a Notice of Change published in the F.A.W. on June 15, 2001, are an invalid exercise of legislative authority.
Findings Of Fact Based upon observation of the witnesses and their demeanor while testifying, the documentary evidence received, and the entire record compiled herein, the following material and relevant facts are found. Effective July 1, 1999, Respondent, FWCC became primarily responsible for implementation of the Florida Manatee Sanctuary Act, Section 370.12(2), Florida Statutes (2000) instead of the Department of Environmental Protection, by operation of Section 45, Chapter 99-245, Laws of Florida. FWCC is the State agency responsible for promulgating rules pursuant to Section 370.12, Florida Statutes. Respondent noticed proposed rules, and is a mandatory party to a challenge thereto. Section 120.56(1)(e), Florida Statutes. STANDING OF THE PARTIES McGill, Pritchard, Dovark, Gentile, Akins, Mason, Jaren, Robertson, Standing Watch, Inc., Save the Manatee Club, Inc., Florida Wildlife Federation, Inc., and Sea Ray Boats, Inc.1, are substantially affected by one or more of the Proposed Rules in that they operate motorboats in one or more of the areas proposed for regulation, or in that they represent the interests of members who operate motorboats in one or more of the areas proposed for regulations, or who desire to protect manatees and manatee habitats on behalf of members who derive aesthetic or other benefits from manatees, and who observe or otherwise enjoy manatees in Brevard County and elsewhere. Intervenor, Florida Power and Light Company (FPL), is a Florida corporation that owns and operates the Cape Canaveral Power Plant located in Cocoa, Brevard County, Florida. FPL's operations are specifically addressed in the proposed rule in that the proposed rule creates a no-entry zone along an area bordering the FPL Cape Canaveral Power Plant property boundary including easements and right-of-way where electrical generation operating equipment and electrical distribution and transmission equipment are located. Intervenor, Cocoa Beach is a Florida Municipal Corporation located in Brevard County. The Cocoa Beach Sports Area located with the Banana River Lagoon has been designated since 1988 as an area for water-related recreational activities for the residents of the City of Cocoa Beach and for the general public. The Proposed Rule seeks to impose speed restrictions for boats operating within this area and, if promulgated, will directly regulate and restrict the boating, fishing and other water-related recreational activities of the public within the area. Intervenor, Titusville is a Florida Municipal Corporation located in Brevard County, whose elected body has determined that a substantial number of its residents are substantially affected in the Proposed Rule. The parties alleged facts supported their standing in individual petitions, and the parties stipulated to standing. Therefore, none of the Petitioners presented any evidence regarding their standing. Petitioners and Intervenors are substantially affected by one or more sections of the proposed rule in that they operate motorboats in one or more of the areas proposed for regulation, or they represent the interests of members who operate motorboats in one or more of the areas proposed for regulation or who desire to protect the manatees and manatee habitat on behalf of members who derive aesthetic or other benefits from manatees and who observe or otherwise enjoy manatees in Brevard County. ADOPTION PROCESS FOR THE 2001 RULE PROPOSAL On September 6, 2000, the Commission authorized staff to initiate amendments to the Brevard County rules at a public meeting in Deland, Florida. On October 6, 2000, the Commission published a Notice of Rule Development in the Florida Administrative Weekly and announced a rule development workshop. On October 26, 2000, the Commission staff conducted a rule development workshop in Melbourne, Brevard County, Florida. On January 24, 2001, the Commission directed staff to conduct a second rule development workshop in Brevard County, Florida. On February 16, 2000, the Commission published notice in the Florida Administrative Weekly of the rule development workshop scheduled for March 7, 2000. On March 7, 2000, the Commission staff conducted a second rule development workshop in Viera, Brevard County, Florida. On March 30, 2000, the Commission conducted a public meeting in Tallahassee, Florida, and authorized publication of a Notice of Proposed Rulemaking in the Florida Administrative Weekly. On April 20, 2001, the Commission published a Notice of Proposed Rulemaking in the Florida Administrative Weekly and advertised public hearings to be held on May 3 and May 23, 2001. On May 3, 2001, the Commission staff conducted a public hearing on the Proposed Rule in Melbourne, Brevard County, Florida. On May 23, 2001, the Commission staff conducted a public hearing on the Proposed Rule in Melbourne, Brevard County, Florida. On June 15, 2001, a Notice of Change was published in the Florida Administrative Weekly. There are no algorithms, formulae, protocols, matrices, math models, or metrics used by the Commission to combine the individual data sources into findings that idle-speed, slow-speed, or no-entry zones were required for any specific zone in question. Aerial surveys have been conducted by the Florida Marine Research Institute (FMRI) and others. One type of aerial survey technique is a statewide survey. These surveys are typically flown in the winter, after the passage of a cold front. Typical winter aggregation areas are included in these surveys. The synoptic surveys are used for monitoring winter aggregations of manatees. Population biologists working on manatee recovery view synoptic survey results as the best available information about the minimum estimated size of the manatee population in Florida at this time. The statewide synoptic survey data from the past several years is as follows: 1991 1,268 manatees 1991 1,465 manatees 1992 1,856 manatees 1995 1,443 manatees 1995 1,822 manatees 1996 2,274 manatees 1996 2,639 manatees 1997 2,229 manatees 1997 1,709 manatees 1998 2,022 manatees 1999 2,034 manatees 1999 2,354 manatees 2000 1,629 manatees 2000 2,222 manatees 2001 3,276 manatees During the most recent statewide synoptic survey, portions of Brevard County were observed in five counts made during January 5, 6, and 7, 2001. Of the 591 manatees observed in Brevard County on January 6, 2001, 457 manatees were adjacent to Florida Power and Light Company's thermal discharge, 38 manatees were in Sebastian River, 16 manatees were in Berkley Canal System, and 8 manatees were along the east Banana River shoreline on the southeastern extension of Merritt Island. In addition to statewide surveys, targeted aerial surveys in specific areas are used to establish manatee distribution and relative manatee abundance. These types of surveys are used by the FWCC in assessing manatee use of an area and then establishing manatee protection regulations. The most recent, comprehensive FMRI aerial survey in Brevard County consisted of 45 flights between September 1997 and September 1999. A standardized flight path designed to cover most probable manatee habitats was flown over Brevard County at least once per month during the two-year period at an altitude of approximately 500 feet (except for June 1999, where excessive smoke covered the area); the only area of the county not covered at all was restricted airspace associated with the Kennedy Space Center Complex. The highest number of manatees counted during this survey was 790 manatees in March 1999. General Description of Brevard County. Located in east central Florida, Brevard County is approximately 72 miles north-south and approximately 20 miles east-west. The west boundary of the county is the St. Johns River; the east boundary is the Atlantic Ocean. The Indian River Lagoon in Brevard County extends north of the Kennedy Space Center, at the north end of the county, to Sebastian Inlet, at the south end of the county. Brevard County consists of two major landforms and two major surface waters. From east to west, the geographical features are the Atlantic Ocean, a barrier island running the length of the county, the Indian River Lagoon, and the mainland. Northern Brevard County contains two other major geographical features. The barrier widens to form the Canaveral Peninsula on the east and Merritt Island on the west. Merritt Island is bordered by the Indian River on the west; the Banana River on the east; and the Mosquito Lagoon on the north. At the southern end of Merritt Island, the Banana River joins the Indian River. Besides Sebastian Inlet at the southern boundary of the county, the only navigable connection between the Indian River Lagoon and the Atlantic Ocean is at Port Canaveral. Port Canaveral cuts across the Canaveral Peninsula; along the west shoreline, the Canaveral Locks permit vessels to pass from the Port into the Banana River. The Mosquito Lagoon, Indian River and Banana River are located in a transitional zone between the temperate and tropical zones and form one of the most diverse estuaries in North America. The Indian River Lagoon varies from 0.5 to 5 miles in width and has an average depth of one meter (39.4 inches). The Indian River Lagoon system is not subject to significant periodic lunar tides. The water depths are depicted as mean lower low water, while the shorelines are represented in terms of approximate mean high water. In the lagoon system in Brevard County, the relative water levels rise and fall as influenced by wind, rainfall, storms, and tides. Expert witnesses with local knowledge of the waters acknowledged the variation in water level or relative depth and testified that the water level fluctuates in the Indian River Lagoon by more than three feet and fluctuates by two or two and one-half feet or greater annually. The Indian River Lagoon contains extensive sea grass beds, which are the preferred food for manatees. A bathymetric survey commissioned by the St. Johns River Water Management District determined the acreage of submerged land within the lagoon that can be potentially vegetated with submerged aquatic vegetation at a depth of six feet below mean sea level. Brevard County is the hub of the Atlantic Coast manatee population with a large year-round and a large migratory transient manatee population present throughout the year. THE MANATEE The West Indian manatee (Trichechus manatus) is one of endangered marine mammals in coastal waters of the United States. The West Indian manatee is presently classified as an "endangered species" by the federal Endangered Species Act and has protected status under the Marine Mammal Protection Act. The West Indian Manatee is one of the four living species of the mammalian Order Sirenia, the other three are the West African manatee, the Amazonian manatee and the dugong; the fifth species, Stellar's sea cow, was hunted into extinction. In the southeastern United States, manatees are limited primarily to Florida and Georgia and this group forms a separate subspecies called the Florida manatee (T. manatus latirostris). The Florida manatee (hereinafter "manatee") is a migratory species with a large range of movement along the Atlantic and Gulf Coasts of the United States. During the winter, cold temperatures keep the population concentrated in peninsular Florida, but during the late spring and summer they expand their range and are seen infrequently as far north as Rhode Island, and as far west as Texas. Manatees demonstrate "site fidelity" with some individual mammals adjusting their behavior to take advantage of changes in the availability of resources. Manatees often return to the same winter thermal refuges and the same summer habitats year after year. Manatees prefer water temperatures above 68 degrees F and when ambient water temperatures drop below 68 degrees, they seek warm water refuges, such as spring-fed rivers and power plans discharge outs. Florida Power and Light Company and Reliant Energy Power Plants and the Sebastian River are the primary warm water refuges sought by manatees in Brevard County. For feeding, resting, cavorting, mating and calving, manatees prefer shallow sea grass beds in coastal and riverline habitats with ready access to deep channels, particularly near the mouths of creeks, embayments and lagoons. Manatees sometimes prefer vegetation growing along the banks of waterways, instead of submerged or floating aquatic vegetation. Manatees seek and find sources of fresh water for drinking. In brackish or estuarine environment, they locate fresh water sources, either natural or artificial. They have been observed drinking fresh water at marinas, from air conditioning condensate discharge, from pockets of fresh water floating on the surface of the saltier water, from storm water outfalls and from springs. Typically, six-to-eight hours per day are spent on feeding, usually at one-hour intervals. Intermittently, between two and 12 hours per day are spent resting or sleeping either at the surface of the water or on the bottom. Time not devoted to feeding or sleeping is spent in traveling, socializing or exploring during both day and nighttime hours. The basic social unit consists of a female manatee and her dependent calf. Manatees, apart from winter aggregations at warm water resources and transient mating herds, are semi-social or mildly social mammals. Manatees usually prefer to swim below the surface at one to three meters (3.28 to 9.84 feet) depth, surfacing every few minutes to breathe. They typically have a swimming cruising speed between four and ten KM/HR (2-6 MPH), but can swim in short bursts at up to 25 KM/HR (15 MPH). Manatees have been seen in shallow waters with their backs and heads out of the water and on occasion have been observed fully or partially out of the water to feed or escape pursuing male manatees. Female manatees reach sexual maturity by age five years and males at the age of three to four years. Mating occurs when estrous females are successfully approached by dynamic epherimal mating herds of between five and 20 males (lasting up to four weeks). Female manatees will swim to very shallow water when pursued by mating herds of males as a preventive measure from mating. Manatees have a low reproductive rate and a long life expectancy. Manatee's gestation period is 11 to 14 months with usual birthing of one calf. Dependent calves remain near their mother's side from one to two years, swimming parallel to its mother, directly behind her flipper. Life expectancy for a manatee is in excess of 50 years. A significant decrease in adult survivorship due to, among other things, watercraft collisions could contribute to a long-term population decline. The manatee population in Florida has shown yearly increases resulting in more manatees now than there were in 1976 in the areas of Brevard County that are subject to the Proposed Rules. MANATEE PROTECTION PLANS The United States Fish and Wildlife Service developed an initial recovery plan for West Indian manatees in 1980, primarily for manatees in Florida. The plan was revised in 1989 and 1996. A third revision to the Recovery Plan was noticed for public comment in November 2000, and in July 2001. The recovery plans hereinabove recognized the major human-related cause of manatee mortality is collisions with watercraft. The existing and draft recovery plans state: Because watercraft operators cannot reliably detect and avoid hitting manatees, federal and state managers have sought to limit watercraft speed in areas manatees are most likely to occur to afford boaters and manatees time to avoid collisions. Avoidance technology research is ongoing for deterrent devices designed to "avoid collisions"; however, no device or combination of devices has gained acceptance and approval by the Marine Biological Scientific Community. The Florida Legislature has designated the entire State a refuge and sanctuary for the manatee--the Florida State marine mammal. Section 370.12(2)(b), Florida Statutes. HISTORY OF MANATEE PROTECTION IN BREVARD COUNTY The Florida Legislature initially authorized the adoption of manatee protection rules for Brevard County effective July 1, 1978, when it required the (former) Florida Department of Natural Resources to adopt rules regulating the speed and operation of motorboats between November 15 and March 31, 1978, in those portions of the Indian River within 3/4 mile of the then Orlando Utilities Commission (now Reliant) and Florida Power and Light Company power plant effluents. These rules became effective on March 19, 1997 (former Rule 16N-22.06, Florida Administrative Code ("Brevard County Manatee Protection Rules" or "BCMPR"). In 1989, a strategy to improve manatee protection in 13 key counties was approved by the Governor and Cabinet. The strategy called for development of manatee protection plans, for boat facility siting criteria, for priority land acquisition of critical manatee use areas, and improved aquatic preserve management for sea grass protection. Guidelines for implementation included new or expanded speed zones, refuges or sanctuaries for the regulation of boat speeds in critical manatee areas. Financial assistance was given Brevard County for its manatee protection plan in 1993. After creation of the FWCC, effective July 1, 1999, the BCMPR and other manatee protection rules were transferred from Florida Department of Environmental Protection (FDEP) to the FWCC, and the Secretary of State renumbered the prior rules to Chapter 68C-22, Florida Administrative Code. In 1994, FDEP amended BCMPR to establish manatee protection zones in the Canaveral Barge Canal and portions of adjacent areas of the Indian and Banana Rivers; to expand the existing "slow speed" zone in Sykes Creek (north of "S Curve") to include the channel; to establish a maximum 25 MPH zone in the Sykes Creek channel between Sykes Creek Parkway and the "S Curve"; and to renumber and correct map inconsistencies. This site- specific rule-making action was taken in response to proposed additional threats to manatees resulting from development of Abby Marina (now Harbortown Marina), pending completion of Brevard County comprehensive countywide manatee protection plan. In 1998, FDEP amended the BCMPR to establish seasonal "motorboats prohibited" and "no-entry" zones at the then Orlando Utilities Commission's (now Reliant) power plant and a seasonal "no-entry" zone at Florida Power and Light Company's power plant. THE PROPOSED MANATEE PROTECTION RULE AMENDMENTS FOR BREVARD COUNTY 1906 Section II - Proposed Rules THE FULL TEXT OF THE PROPOSED RULES IS: (Substantial rewording of Rule 68C-22.006 follows. See Florida Administrative Code for present text.) 68C-22.006 Brevard County Zones. The Commission hereby designates the waters within Brevard County, as described below, as areas where manatee sightings are frequent and where it can be assumed that manatees inhabit on a regular, periodic or continuous basis. The Commission has further determined that a likelihood of threat to manatees exists in these waters as a result of manatees and motorboats using the same areas. The primary purpose of this rule is to protect manatees from harmful collisions with motorboats and from harassment by regulating the speed and operation of motorboats within these designated areas. A secondary purpose is to protect manatee habitat. In balancing the rights of fishers, boaters, and water skiers to use these waterways for recreational and commercial purposes (as applicable under 370.12(2)(j), F.S.) with the need to provide manatee protection, the Commission has examined the need for unregulated areas or higher speed travel corridors through regulated areas. Such areas or corridors are provided in those locations where the Commission determined, on the basis of all available information, (1) there is a need for the area or corridor and (2) the area or corridor will not result in serious threats to manatees or their habitat. Unregulated areas or higher speed corridors are not provided in locations where both of the above findings were not made. The following year-round and seasonal zones are established, which shall include all associated and navigable tributaries, lakes, creeks, coves, bends, backwaters, canals, and boat basins unless otherwise designated or excluded. As used in this rule, ICW means the Intracoastal Waterway. Access to the NO ENTRY and MOTORBOATS PROHIBITED zones designated in paragraphs (2)(a) and (b) will be provided in accordance with procedures set forth in subsection (4), hereunder, and applicable provisions of Rule 68C-22.003. NO ENTRY (November 15 – March 31) Indian River, Reliant Corporation Delespine Power Plant Area: All waters within the discharge canal of the Reliant Corporation Delespine power plant, and; All waters southerly of a line extending eastward from and following the same bearing as the southernmost seawall of the power plant discharge canal, with said line bearing approximately 70º, westerly of a line 250 feet east of and parallel to the western shoreline of the Indian River, and northerly of the jetty on the north side of the power plant intake canal. Indian River, FPL Frontenac Power Plant Area: All waters in the vicinity of the Florida Power and Light (FPL) Frontenac power plant southerly of a line connecting the northern guy wires of the power poles immediately north of the FPL Unit 2 discharge area from the western shoreline of the Indian River to the third power pole east of the western shoreline (approximately 1,650 feet east of the shoreline), and westerly of a line running from said third power pole to the easternmost point (approximate latitude 28º 28' 07" North, approximate longitude 80º 45' 19" West) of the jetty on the north side of the FPL intake canal. MOTORBOATS PROHIBITED (All Year, except as noted) Indian River, Reliant Corporation Delespine Power Plant Area: All waters in the vicinity of the Reliant Corporation Delespine power plant southerly of a line bearing 90º from a point (approximate latitude 28º 29' 41" North, approximate longitude 80º 46' 35" West) on the western shoreline of the Indian River 95 feet north of the northernmost seawall of the power plant discharge canal, westerly of a line 250 feet east of and parallel to the western shoreline of the Indian River, and northerly of a line extending eastward from and following the same bearing as the southernmost seawall of the power plant discharge canal, with said line bearing approximately 70º. This zone is in effect from November 15 through March 31. C-54 Canal: All waters of the C-54 Canal (South Florida Water Management District Canal 54) east of the spillway (approximate latitude 27º 49' 50" North, approximate longitude 80º 32' 24" West) and west of a line drawn perpendicular to the northern shoreline of the C-54 Canal at a point (approximate latitude 27º 49' 55" North, approximate longitude 80º 32' 00" West) on the northern shoreline 2,500 feet east of the spillway. IDLE SPEED (All Year, except as noted) Indian River, Power Plant Area: All waters west of the western boundary of the ICW channel, south of a line bearing 90° from a point (approximate latitude 28º 30' 13" North, approximate longitude 80º 46' 48" West) on the western shoreline of the Indian River approximately three-fourths of a mile north of the Delespine power plant discharge canal, and north of a line bearing 90° from a point (approximate latitude 28º 27' 27" North, approximate longitude 80º 45' 43" West) on the western shoreline of the Indian River approximately three-fourths of a mile south of the Frontenac power plant discharge canal, except as otherwise designated under (2)(a) and (b)1. This zone is in effect from November 15 through March 31. Banana River, Cape Canaveral Area: All waters north of a line bearing 270° from the southwesternmost point (approximate latitude 28º 23' 29" North, approximate longitude 80º 37' 10" West) of Long Point in Cape Canaveral to a point (approximate latitude 28º 23' 29" North, approximate longitude 80º 37' 49" West) in the Banana River approximately 3,500 feet west of Long Point, and east of a line bearing 331° from said point in the Banana River to a point (approximate latitude 28º 24' 16" North, approximate longitude 80º 38' 19" West) on the State Road 528 Causeway (west of State Road 401). Section II - Proposed Rules 1907 Banana River, Manatee Cove Area: All waters of Manatee Cove (on the east side of the Banana River, just south of State Road 520) east of a line at the mouth of the cove running between a point (approximate latitude 28º 21' 21" North, approximate longitude 80º 36' 52" West) on the northern shoreline and a point (approximate latitude 28º 21' 09" North, approximate longitude 80º 36' 51" West) on the southern shoreline. Turkey Creek: All waters of Turkey Creek north and east (downstream) of Melbourne- Tillman Drainage District structure MS-1 and south and west of a line at the mouth of Turkey Creek that runs from the southeasternmost point (approximate latitude 28º 02' 21" North, approximate longitude 80º 34' 48" West) of Castaway Point to the northeasternmost point (approximate latitude 28º 02' 14" North, approximate longitude 80º 34' 43" West) of Palm Bay Point. Sebastian Inlet Area: All waters of the cove on the northern side of Sebastian Inlet (commonly known as Campbell Cove) northwest of a line running between the two rock jetties at the entrance to the cove. Sebastian River Area: All waters of the North Prong of Sebastian River, and; All waters of the North Fork Sebastian River (also known as Sebastian Creek) and the C-54 Canal west of a north-south line from a point (approximate latitude 27º 50' 08" North, approximate longitude 80º 31' 02" West) on the northern shoreline of the North Fork Sebastian River at the intersection of the river and the North Prong and east of a line drawn perpendicular to the northern shoreline of the C-54 Canal at a point (approximate latitude 27º 49' 55" North, approximate longitude 80º 32' 00" West) on the northern shoreline 2,500 feet east of the spillway. SLOW SPEED (All Year) Mosquito Lagoon: All waters west of the ICW channel, south of the Volusia County/Brevard County line, and north of ICW channel marker “43,” and; All waters of Mosquito Lagoon (including the ICW channel) south of ICW channel marker “43,” southwest of a line commencing at ICW channel marker “43” and then running to ICW channel marker “45” and then on a bearing of 132° for a distance of 1,000 feet to the line’s terminus at a point in Mosquito Lagoon (approximate latitude 28º 44' 35" North, approximate longitude 80º 44' 35" West), and north of a line running from said point in Mosquito Lagoon on a bearing of 221° to the western shoreline of Mosquito Lagoon. Indian River, Turnbull Basin Area: All waters south and east of a line commencing at a point (approximate latitude 28º 44' 36" North, approximate longitude 80º 46' 19" West) on the eastern shoreline of Turnbull Basin (about one mile north of Haulover Canal) and then bearing 193° to a point 1,500 feet northwest of the ICW channel, then running in a southwesterly direction 1,500 feet northwest of and parallel with the ICW channel to a point (approximate latitude 28º 41' 22" North, approximate longitude 80º 49' 05" West) 1,500 feet northwest of ICW channel marker “12,” and then running in a southerly direction 1,500 feet west of and parallel with the ICW channel to the Florida East Coast Railroad Bridge, including all waters west of the ICW channel and south of an east-west line 1,500 feet north of the point where the Florida East Coast Railroad Bridge crosses over the ICW, but excluding the ICW channel as designated under (2)(e)2. Indian River, Titusville Area: All waters south of the Florida East Coast Railroad Bridge, east of the ICW channel, and north of an east-west line 1,200 feet south of the point where the Florida East Coast Railroad Bridge crosses over the ICW, and; All waters west of the ICW channel south of the Florida East Coast Railroad Bridge and north of the State Road 402 Bridge and Causeway. Indian River, State Road 402 (Max Brewer Causeway) to State Road 405 (NASA Parkway): All waters within 2,000 feet of the general contour of the western shoreline of the Indian River, excluding the ICW channel where the channel is less than 2,000 feet from the western shore; All waters within one mile of the general contour of the eastern shoreline of the Indian River south and east of a point (approximate latitude 28º 36' 04" North, approximate longitude 80º 44' 44" West) on the western shoreline of Peacock’s Pocket (northwest of Banana Creek), and; All waters south of an east-west line 3,400 feet north of the point where the State Road 405 Bridge crosses over the ICW, excluding the ICW channel as designated under (2)(e)3. Indian River, State Road 405 (NASA Parkway) to State Road 528 (Bennett Causeway): All waters north of an east-west line 3,000 feet south of the point where the State Road 405 Bridge crosses over the ICW, excluding the ICW channel as designated under (2)(e)3.; All waters west of the ICW channel and north of the overhead power transmission line that crosses the western shoreline of the Indian River approximately 1,200 feet north of State Road 528, excepting those areas otherwise designated for seasonal regulation under (2)(a), (b)1., and (c)1. when said seasonal zones are in effect; All waters south of said overhead power transmission line and west of a north-south line running through the second power pole east of the western shoreline; All waters within one-half mile of the eastern shoreline of the Indian River north of a point (approximate latitude 28º 25' 47" North, approximate longitude 80º 43' 24" West) on the eastern shoreline of the Indian River 1,500 feet south of the canal on the southern side of Meadow Lark Lane, including all waters of Rinkers Canal, and; All waters east of the ICW channel and south of the overhead power transmission line that crosses the eastern shoreline of the Indian River approximately 3,900 feet north of State Road 528. Indian River, State Road 528 (Bennett Causeway) to State Road 518 (Eau Gallie Causeway): All waters within 1,000 feet of the general contour of the western shoreline of the Indian River; All waters south of State Road 528 and within 1908 Section II - Proposed Rules 500 feet of the State Road 528 Causeway, within 500 feet of the State Road 520 Causeway, within 500 feet of the State Road 404 Causeway, and north of State Road 518 and within 500 feet of the State Road 518 Causeway; All waters within 1,000 feet of the general contour of the eastern shoreline of the Indian River between State Road 528 and State Road 520; All waters east of the ICW channel from State Road 520 to an east-west line 300 feet south of the southernmost point (approximate latitude 28º 19' 22" North, approximate longitude 80º 42' 00" West) of the spoil island east of ICW channel marker “80,” and; All waters within 500 feet of the general contour of the eastern shoreline of the Indian River south of the aforementioned east-west line and north of State Road 404 (Pineda Causeway). Indian River, State Road 518 (Eau Gallie Causeway) to Cape Malabar: All waters within 1,000 feet of the general contour of the eastern shoreline of the Indian River; All waters south of State Road 518 and within 500 feet of the State Road 518 Causeway and within 500 feet of the State Road 192 Causeway; All waters within 1,000 feet of the general contour of the western shoreline of the Indian River south of State Road 518 and north of the easternmost point (approximate latitude 28º 02' 24" North, approximate longitude 80º 34' 48" West) of Castaway Point (including all waters of the Eau Gallie River and Crane Creek), and; All waters south of said easternmost point of Castaway Point, north of Cape Malabar, and west of a line commencing at a point (approximate latitude 28º 02' 29" North, approximate longitude 80º 34' 38" West) in the Indian River 1,000 feet northeast of said easternmost point of Castaway point, then bearing 130° to the westernmost point (approximate latitude 28º 02' 15" North, approximate longitude 80º 34' 19" West) of the spoil site west of ICW channel marker “14,” then bearing 153° to the westernmost point (approximate latitude 28º 01' 32" North, approximate longitude 80º 33' 55" West) of the spoil site southwest of ICW channel marker “15,” then bearing 138° to the line’s terminus at a point (approximate latitude 28º 01' 12" North, approximate longitude 80º 33' 35" West) in the Indian River approximately 2,400 feet northeast of Cape Malabar. Indian River, Cape Malabar to Grant: All waters within 1,000 feet of the general contour of the eastern shoreline of the Indian River south of Cape Malabar and north of a point (approximate latitude 27º 55' 59" North, approximate longitude 80º 30' 30" West) on the eastern shoreline of the Indian River (north of Mullet Creek); All waters south of Cape Malabar, north of the spoil island between ICW channel markers “25” and “27,” and west of a line commencing at a point approximate latitude 28º 01' 12" North, approximate longitude 80º 33' 35" West) in the Indian River approximately 2,400 feet northeast of Cape Malabar, then bearing 157° to the easternmost point (approximate latitude 28º 00' 26" North, approximate longitude 80º 33' 13" West) of the spoil site between ICW channel markers “16” and “17,” then bearing 152° to the easternmost point (approximate latitude 27º 59' 21" North, approximate longitude 80º 32' 35" West) of the spoil island west of ICW channel marker “22,” then bearing 166° to the line’s terminus at the easternmost point (approximate latitude 27º 57' 50" North, approximate longitude 80º 32' 10" West) of the spoil island between ICW channel markers “25” and “27;” All waters within 1,000 feet of the general contour of the western shoreline of the Indian River south of said spoil island between ICW channel markers “25” and “27,” and north of ICW channel marker “35,” and; All waters west of the ICW channel between ICW channel markers "35" and “38.” Indian River, Grant to the Indian River County Line: All waters west of the ICW channel between ICW channel marker "38" and the Brevard County/Indian River County line, including those waters east of the centerline of the U.S. 1 Bridge over the Sebastian River, and: All waters within 1,500 feet of the general contour of the eastern shoreline of the Indian River, south of a point (approximate latitude 27º 55' 59" North, approximate longitude 80º 30' 30" West) on the eastern shoreline of the Indian River (north of Mullet Creek) and north of an east-west line running through ICW channel marker “59” (approximate latitude 27º 51' 38" North, approximate longitude 80º 28' 57" West), including those waters within 1,500 feet west of the westernmost edge of the Mullet Creek Islands, within 1,500 feet west of the westernmost edge of the islands south of Mathers Cove, within 1,500 feet west of the westernmost edge of Long Point, and within 1,500 feet west of the westernmost extensions of Campbell Pocket south to said east-west line running through ICW channel marker “59,” and; All waters of the Indian River and Sebastian Inlet east of the ICW channel, south of said east-west line running through ICW channel marker “59,” north of the Brevard County/Indian River County line, and west of a line 200 feet southwest of and parallel with the centerline of the State Road A1A Bridge, except as otherwise designated under (2)(c)5. and excluding the marked Sebastian Inlet channel. Sebastian River Area: All waters of the Sebastian River (including waters also known as San Sebastian Bay), the South Fork San Sebastian River (also known as St. Sebastian River, Sebastian River and Sebastian Creek), and the North Fork Sebastian River (also known as Sebastian Creek) within Brevard County west of the centerline of the U.S. 1 Bridge and east of a north-south line from a point (approximate latitude 27º 50' 08" North, approximate longitude 80º 31' 02" West) on the northern shoreline of the North Fork Sebastian River at the intersection of the river and the North Prong of Sebastian River. Canaveral Barge Canal: All waters of the Canaveral Barge Canal east of the general contour of the eastern shoreline of the Indian River and west of the general contour of the western shoreline of the Banana River. Sykes Creek and Kiwanis Basin: All waters of Sykes Creek and Kiwanis Basin south of the Canaveral Barge Canal and north of the centerline of State Road 520. Section II - Proposed Rules 1909 Newfound Harbor: All waters south of State Road 520 and within 1,000 feet of the State Road 520 Bridge and Causeway; All waters within 1,000 feet of the general contour of the western shoreline of Newfound Harbor north of the runway for the Merritt Island Airport (approximately one mile south of State Road 520), and; All waters within 1,000 feet of the general contour of the eastern shoreline of Newfound Harbor and an extension of said shoreline to a point 1,000 feet south of Buck Point. Banana River, North of State Road 528: All waters within 1,500 feet of the general contour of the western shoreline of the Banana River south of a point (approximate latitude 28º 26' 10" North, approximate longitude 80º 39' 35" West) on the shoreline near Kars Park on the boundary of the federal No Motor zone; All waters south of an east-west line running through the westernmost point (approximate latitude 28º 24' 42" North, approximate longitude 80º 38' 34" West) of the first spoil island north of the Canaveral Locks (commonly known as Ski Island), including those waters in Port Canaveral west of State Road 401, and; All waters east and south of a line commencing at the northernmost point (approximate latitude 28º 24' 44" North, approximate longitude 80º 38' 32" West) of Ski Island, then running to the southernmost point (approximate latitude 28º 24' 55" North, approximate longitude 80º 38' 31" West) of the second spoil island north of the Canaveral Locks, then following the eastern shoreline of said spoil island to its northernmost point, then bearing 6° to a point (approximate latitude 28º 25' 09" North, approximate longitude 80º 38' 29" West) in the Banana River underneath the overhead power transmission line south of the third spoil island north of Canaveral Locks, then following said transmission line (which is the boundary of the federal No Motor zone) in an easterly direction to the line’s terminus at a point (approximate latitude 28º 25' 16" North, approximate longitude 80º 36' 13" West) on the eastern shoreline of the Banana River. Banana River, State Road 528 to State Road 520: All waters south of State Road 528 and north of an east-west line 1,000 feet south of the point where the State Road 528 Bridge crosses over the main Banana River channel, except as otherwise designated under (2)(c)2.; All waters west of a line running from a point (approximate latitude 28º 24' 16" North, approximate longitude 80º 39' 30" West) on the State Road 528 Causeway east of the western State Road 528 Relief Bridge to a point (approximate latitude 28º 21' 26" North, approximate longitude 80º 39' 32" West) on the State Road 520 Causeway approximately 1,200 feet west of the water storage tanks, and; All waters south of a line bearing 270° from the southwesternmost point (approximate latitude 28º 23' 29" North, approximate longitude 80º 37' 10" West) of Long Point in Cape Canaveral to a point (approximate latitude 28º 23' 29" North, approximate longitude 80º 37' 49" West) in the Banana River approximately 3,500 feet west of Long Point, and east of a line bearing 174° from said point in the Banana River to a point (approximate latitude 28º 21' 28" North, approximate longitude 80º 37' 35" West) on the State Road 520 Causeway approximately 1,000 feet west of Cape Canaveral Hospital Complex. Banana River, Cocoa Beach Area: All waters south of State Road 520 and within 1,000 feet of the State Road 520 Causeway, excluding the main Banana River channel; All waters within 1,000 feet of the general contour of the western shoreline of the Banana River, south of State Road 520 and north of Buck Point and an extension of said shoreline to a point 1,000 feet south of Buck Point, excluding the main Banana River channel where the channel is less than 1,000 feet from the western shoreline, and; All waters east of a line commencing at a point (approximate latitude 28º 21' 25" North, approximate longitude 80º 38' 30" West) on the State Road 520 Causeway (approximately 2,000 feet east of the State Road 520 Bridge over the main Banana River channel), then bearing 190° to a point (approximate latitude 28º 19' 15" North, approximate longitude 80º 38' 55" West) in the Banana River approximately 1,900 feet west of the northwesternmost point of the Cocoa Beach Municipal Park, then bearing 270° to a point (approximate latitude 28º 18' 38" North, approximate longitude 80º 38' 55" West) in the Banana River approximately 1,700 feet west of the southwesternmost point of the Cocoa Beach Municipal Park, then bearing 171° for approximately 3,000 feet to a point (approximate latitude 28º 18' 07" North, approximate longitude 80º 38' 50" West) in the Banana River east of channel marker “15,” then bearing 124° to a point (approximate latitude 28º 16' 52" North, approximate longitude 80º 36' 45" West) in the Banana River 1,000 feet west of the eastern shoreline of the Banana River, then heading in a southerly direction 1,000 west of and parallel with the eastern shoreline of the Banana River to the line’s terminus at a point (approximate latitude 28º 15' 51" North, approximate longitude 80º 36' 38" West) in the Banana River near the northern boundary of Patrick Air Force Base. Banana River, South of Cocoa Beach to State Road 404 (Pineda Causeway): All waters south of an east-west line running through the southernmost point (approximate latitude 28º 16' 19" North, approximate longitude 80º 39' 25" West) of the more southerly of the two islands east of Macaw Way (on Merritt Island) and west of a line bearing 162° from said southernmost point to State Road 404; All waters south and east of the overhead power transmission line in the Banana River adjacent to Patrick Air Force Base, and; All waters north of the centerline of State Road 404 and within 2,000 feet of the State Road 404 Bridges and Causeway, excluding the main Banana River channel as designated under (2)(e)5. Banana River, South of State Road 404 (Pineda Causeway): All waters south of the centerline of State Road 404, including those waters east of a line bearing 270° from the southernmost point (approximate latitude 28º 08' 32" North, approximate longitude 80º 36' 15" West) of Merritt Island 1910 Section II - Proposed Rules (commonly known as Dragon Point) to the Eau Gallie Causeway, excluding the main Banana River channel as designated under (2)(e)5. 25 MPH (All Year) Mosquito Lagoon: All waters in the ICW channel south of the Volusia County/Brevard County line and north of ICW channel marker “43” (north of Haulover Canal). Indian River, Turnbull Basin and Titusville Area: All waters in the ICW channel southwest of ICW channel marker “1” (southwest of Haulover Canal) and north of an east-west line 1,200 feet south of the point where the Florida East Coast Railroad Bridge crosses over the ICW. Indian River, State Road 405 (NASA Parkway) Area: All waters in the ICW channel south of an east-west line 3,400 feet north of the point where the State Road 405 Bridge crosses over the ICW and north of an east-west line 3,000 feet south of the point where the State Road 405 Bridge crosses over the ICW. South Indian River Area: All waters in the ICW channel south of ICW channel marker “59” and north of the Brevard County/Indian River County line. South Banana River Area: All waters in the main Banana River channel south of a point in the channel 2,000 feet north of the State Road 404 Bridge, and north of a point (approximate latitude 28º 09' 15" North, approximate longitude 80º 36' 32" West) in the channel on the northern boundary of the local Idle Speed zone approximately 1,900 feet north of the Mathers Bridge. Commercial Fishing and Professional Fishing Guide Permits: The following provisions pertain to the issuance of permits to allow individuals engaged in commercial fishing and professional fishing guide activities to operate their vessels in specified areas at speeds greater than the speed limits established under subsection (2) above. Procedures related to the application for and the review and issuance of these permits are as set forth in 68C-22.003, Florida Administrative Code. Permits shall be limited as follows: Permits shall only be available for the zones or portions of zones described under (2)(d)1. through (2)(d)9., and (2)(d)13. through (2)(d)18. Permits shall not apply on weekends or on the holidays identified in s. 110.117, F.S. Permit applications may be obtained at the Commission’s Law Enforcement office at 1-A Max Brewer Memorial Parkway in Titusville or by contacting the Commission at Mail Station OES-BPS, 620 South Meridian Street, Tallahassee, Florida 32399 (850-922-4330). Access to the NO ENTRY and MOTORBOATS PROHIBITED zones is allowed for Reliant Corporation employees or their authorized agents (for the zones designated under (2)(a)1. and (b)1.) and for Florida Power and Light Company employees or their authorized agents (for the zone designated under (2)(a)2.) provided that entry into the zones is necessary to conduct activities associated with power plant maintenance, emergency operations or environmental monitoring. The Commission must receive notification of the activity prior to its commencement. In the event of an emergency activity, the Commission shall be notified no more than one week after the activity has been commenced. All vessels used in the operation or associated with the activity shall be operated at no greater than Idle Speed while within the zones and must have an observer on board to look for manatees. The zones described in 68C-22.006(2) are depicted on the following maps, labeled “Brevard County Manatee Protection Zones.” The maps are intended as depictions of the above-described zones. In the event of conflict between the maps and descriptions, the descriptions shall prevail. DATA SOURCES CONSIDERED BY FWCC IN PROMULGATING THE PROPOSED RULE FWCC's staff who were primarily responsible for the development of the recommended revisions to the BCMPR to the FWCC included: Scott Calleson, who holds a Bachelor of Science degree in Marine Science and a Masters of Science degree with emphasis on Environmental Planning and Natural Resource Management, and has worked with manatee protection rules since 1992; David Arnold, who holds both a Bachelor of Science degree in Biology and a Master of Science degree in Biological Oceanography, and who supervised the Department of Environmental Protection's marine turtle protection program prior to becoming Chief of the Bureau of Protected Species Management in 1995; and Dr. Charles Deutsch, who has both a Bachelor of Science and a Doctorate degree in Biology with specialization in biology of marine mammals and behavior, animal behavior and behavioral ecology, and worked for the United States Geological Survey (USGS) in a number of analyses of manatee radio tracking along the Atlantic Coast. The verbal, narrative and graphical presentations of the experts were relied upon in making recommendations to the FWCC for the proposed rule revisions. FWCC's staff gave good faith consideration to the experts' opinions, publications, articles, data analysis, and reasonable inferences and predictions. MANATEE MORTALITY DATA FWCC relied upon manatee mortality data in evaluating manatee inhabitation (Brevard County Mortality Information and Brevard County Misc. Information), including FMRI manatee salvage database for Brevard County from January 1974 to December 2000 (including carcass recovery location and cause of death). AERIAL SURVEY DATA In evaluating manatee inhabitation, FWCC relied upon manatee aerial survey data in existing manatee inhabitations. Included in this process were: information on aerial surveys performed for Kennedy Space Center by Dynamic Corporation; Geographic Information System information for FMRI's 1997-1999 Brevard County aerial survey along with data in "Seasonal Manatee Distribution and Relative Abundance in Brevard County, Florida, 1997-1999"; Geographic Information System data from earlier Brevard County aerial surveys; and aerial surveys conducted by the Florida Marine Research Institute and others. Aerial Surveys Aerial surveys have been conducted by the Florida Marine Research Institute and others using various techniques. One type of aerial survey technique is a statewide survey. These surveys are typically flown in the winter, after the passage of a cold front. Typical winter aggregation areas are included in these surveys. The synoptic surveys are used for monitoring winter aggregations of manatees. Population biologists working on manatee recovery view synoptic survey results as the best available information about the minimum estimated size of the manatee population in Florida at this time. The statewide synoptic survey data from the past several years is as stated in Finding of Fact 23 herein above. In addition to statewide surveys, targeted aerial surveys in specific areas are used to establish manatee distribution and relative manatee abundance. The commission in assessing manatee use of an area and then establishing manatee protection regulations uses these types of surveys. SYNOPTIC AERIAL SURVEYS Considered by FWCC was the statewide synoptic survey for the period 1991 to 2001. These surveys are used for monitoring winter aggregation of manatees and provide a minimum estimate of the number of manatees observed. Population biologists view synoptic survey results as the best available information source to estimate the minimum size of the manatee population in Florida at the present time. The statewide synoptic survey data for the years 1991-2001 are detailed in paragraph 22 herein above. The Berkeley Canal system location, where manatees were observed on January 6, 2001, has four connecting canals to the eastern shoreline of the Banana River; the northernmost connection is just south of the Pineda Causeway and the southernmost connecting canal is located about three and three-fourths miles to the south between Carter's Cut and the Mathers Bridge. The West Banana River shoreline locations where manatees were observed on January 6, 2001, is the Banana River Marina. MANATEE DISTRIBUTION AND RELATIVE ABUNDANCE Targeted aerial surveys in specific areas are used to establish manatee distribution and relative manatee abundance. They are used in assessing manatee use of an area and then in establishing manatee protection regulations in those areas. Forty-five flights between September 1997 and September 1999 are the most comprehensive and recent FMRI aerial surveys in Brevard County. Aerial surveys possess an inherent bias because the location of animals can only be seen during daylight hours and do not account for nighttime locations. FWCC's aerial survey data were presented in various forms: raw data entry sheets completed by the surveyors; a composite, GSI plot of the data points for Brevard County; small- format GIS plots of data points that depicted manatees seen by month; and small-format GIS plots of data points that depicted manatees seen during each flight, along a flight path. Before the 1997-1999 Bervard survey, relative abundance and distribution surveys for portions of Brevard County were conducted in late-1985 through early-1987. The 1985-87 Banana River surveys included only the area between Launch Complex 39B and Eau Gallie, but included portions of Canaveral Barge Canal, Sykes Creek and Newfound Harbor. Flights were flown over the Cocoa Beach area during morning hours for a nine-month period (March 3, 1990- November 27, 1990), and showed more than one manatee during each flight, with one exception on March 3, 1990. SATELLITE TELEMETRY DATA AND VHF RADIO TELEMETRY DATA The FWCC relied upon manatee telemetry data in evaluating manatee inhabitation for Brevard County. Included in the satellite and VHF radio telemetry data relative to inhabitation was a GIS database obtained from the "United States Geological Survey (USGS) Biological Resources Division, Florida Carribean Science Center, Sirenia Project, Gainesville, Florida," and reports authored by Dr. Charles Deutsch who analyzed the USGS data. The USGS Sirenia Project data analyzed by Dr. Deutsch were collected from May 1986 to May 1998, and included both VHF radio and telemetry and satellite telemetry data for the 78 manatees that were tagged for varying amounts of time during that period along the lower East Coast of the United States, excluding data for manatees that were born and raised in captivity. This data was considered by Dr. Deutsch as the best telemetry data available. Of the full USGS Sirenia Project data evaluated by Dr. Deutsch, 61 manatees were tracked at some time during the study period in Brevard County, including 16 manatees that were only tracked using VHF radio tracking and not satellite telemetry. The maximum number of tagged manatees observed in Brevard County during the study period was 12 manatees at one time. Dr. Deutsch opined that about one or two percent of the documented East Coast manatee sub-population was tracked each year. The radio telemetry data subsets from the Sirenia Project covered a ten-year period from May 1986, and included over 6,000 manatee observations for 54 individual tagged manatees. Of those 6,000 observation points, three-quarters (almost 5,000) were actual visual sighting of manatees made by persons on shore or in vessels. Of those visual sightings, approximately ten percent were made by non-government employees. The satellite telemetry data evaluated by Dr. Deutsch included data for 45-tagged manatees that was collected from April 1987 to May 1998, with over 34,000 location records of Class 1, 2, or 3 accuracy. Of the 61-tagged manatees that were observed in Brevard County during the 12-year study period, the median tracking period was 135 days, with some animals tracked for several years while others were tracked for shorter periods of time. Of the 61 manatees tracked in Brevard County, approximately one-half were fitted with radio or satellite telemetry transmitters (tags) while in Brevard County, the other half were tagged in different areas of northeast Florida, in southeast Georgia, or in southeast Florida. A majority of the animals tagged outside of Brevard County were observed in Brevard County, and Dr. Deutsch opined that this data demonstrated Brevard County to be the hub of manatee activity along the Atlantic Coast. MIGRATORY RANGE OF TAGGED MANATEES The size of the migratory ranges of tracked manatees varied with considerable variation of movement by individual manatees in Brevard County. Some manatees would spend eight months of the year near Canaveral Sewer Plant (Banana River) and spend each winter near Port Everglades (Ft. Lauderdale). Many tagged manatees displayed strong site-fidelity, returning to the same seasonal locations yearly while others did not. Telemetry data points are not precisely a depiction of the actual and true location of the manatee at the time of data transmission from the tag to the satellite. Services Argos, the company that administers the hardware, assigned 68 percent of the data points within 150 meters of the true location in class three locations. In 1994, USGS performed accuracy experiments in Brevard County of satellite telemetry and found location class 3 data points to be within 225 meters of the true location, and 95 percent within 500 meters of the true location. In addition to Dr. Deutsch's reports, FWCC considered various telemetry papers and publications pertaining to Brevard County: "Tagged Manatee Use of the Cocoa Beach/Thousand Island Area;" "Winter Movements and Use of Warm-water Refugia by Radio- tagged West Indian Manatees Along the Atlantic Coast of the United States;" and "Easton, Tagged Manatee Movement through the Canaveral Barge Canal, Brevard County Florida" (February 14, 1997). MANATEE SIGHTING DATA FWCC relied upon manatee sighting data in its evaluation of manatee inhabitation. Included in the sighting data was the Brevard County 2001 Rule Development and Trip Notes of February 6- 7, 2001; Sea Ray Boats, Inc. Water Test Re-Run Manatee Sighting Records for 2000-2001; Canaveral Barge Canal Boater Activity and Compliance Study; Sharon Tyson's Sykes Creek Observation Records; and cold-seasons sighting logs for the C-54 canal structure. STUDIES AND REPORTS PERTAINING TO MANATEE DISTRIBUTION, RELATIVE ABUNDANCE, HABITAT, BEHAVIOR, OR OTHER MANATEE INFORMATION. FWCC considered and relied upon the Brevard County Manatee Protection Plan that included an inventory and analysis section about manatees, analysis of manatee mortality data, manatee legislation and protection, law enforcement, habitat issues, existing boat facilities, Brevard County boating activity patterns, and an inventory of present manatee education programs. The existing Federal Manatee Recovery Plan, to which members of the Bureau of Protected Species and Florida Marine Research Institute contributed, was relied upon. SCAR CATALOG DATA FWCC considered and relied upon scar catalog data in evaluating manatee protection needs with Brevard County Misc. Information as the source provider. EXPERT OPINIONS FWCC relied upon expert opinions in evaluating manatee inhabitation. A staff meeting with manatee experts, as part of the process, included, but was not limited to, meetings with Jane Provancha and Sharon Tyson in December 2000, meetings and discussions with Dr. Charles Deutsch between November 2000 and May 2001, and various discussions with members of the federal Recovery Plan Team. OTHER AVAILABLE SITE-SPECIFIC INFORMATION FWCC considered site-specific information that was available, principally drafts of the Brevard County Manatee Protection Plan. FWCC also considered site-specific information about water skiing areas and prospective additional travel times in various waters proposed for new, or changed, regulations. DATA ANALYSIS Threat Analysis Rule 68C-22.001(3), Florida Administrative Code, contemplates a qualitative assessment and exercise of discretion by taking into consideration a balancing of manatee protection needs, including an assessment of relative threats to manatees, with the right of boaters, fishers and water skiers. In assessing where threats to manatees may exist from motorboats, the manatee death database provides information on confirmed interactions, such as locations where manatee carcasses have been recovered. Manatee deaths, carcass recovery and confirmed interactions locations are maintained in FMRI's database. From January 1974 to December 2000, 728 manatees died in Brevard County and 184 of those deaths were because of interactions with watercrafts. Watercraft related deaths account for 23.5 percent of all manatee deaths recorded in Brevard County between 1974 and 2000. Approximately 19 percent of all watercraft related deaths of manatees in Florida have occurred in Brevard County. FWCC has determined that manatee death from watercraft interaction is due to blunt trauma more than 50 percent of the time. Deaths from propeller cuts account for less than 50 percent. Often injury instead of immediate death from motorboat strikes is the case. Many manatees have scars from previous sub- lethal motorboat strikes, and manatees have been observed with more than 30 different strike patterns. Where the cause of death is classified as watercraft related, carcass recovery may or may not be where the collision occurred depending upon the acuteness of the injury at the time of collision. Acuteness of the injury, wind, current, tide, and decomposition all affect the location of the carcass at the time of salvage. Additionally, operation of motorboats can disrupt essential manatee behaviors such as warm water sheltering, feeding, sleeping, mating, and nursing. This harassment can lead to cold-related illnesses and increase mortality risk by driving manatees from warm water refuges. The increase in the Atlantic Coast manatee population and the increase of the number of boat registrations result in an increase in the threat of harmful collisions between boats and manatees. Geographic Scope of Threat Analysis Section 370.12(2)(m), Florida Statutes, does not specifically describe the geographic scope of the FWCC's evaluation of "other portions of state waters" for manatee sightings and assumed inhabitation on a periodic or continuous basis. Subsection 370.12(2)(g), Florida Statutes, suggests that the evaluation of manatee sightings is appropriate for large portions of navigable waterways, such as the Indian River between St. Lucie Inlet and Jupiter Inlet. A "waterway" is generally defined as "a navigable body of water." (Webster's Ninth New Collegiate Dictionary, p. 1333.) Rule 68C-22.001(3)(a)2.f., Florida Administrative Code, contemplates a qualitative assessment of the "likelihood of threat" to manatees. The only reference is to the "characteristics of the waterway in question." The rule does not mandate the geographic scope of a "threat evaluation." The FWCC analyzed various data on different scales depending upon the nature of the inquiry - the evaluation of sighting "frequency" generally considered a large geographical area such as a section of a river. Conversely, the regulatory alternatives to protect manatees were evaluated at a smaller or finer scale. The Commission also considered segments of waterways divided by causeways or natural barriers. The Commission considered research that divided Brevard County (north of Eau Gallie) into 12 zones for purposes of analysis. In the Brevard County Manatee Protection Plan, the waterways were analyzed in terms of seven "planning zones," to include review of physical characteristics such as bathymetry and sedimentological conditions, shoreline conditions, and water quality; Manatee Habitat Features, including sea grass, mangrove/salt marsh, freshwater sources, warm water refugia, calving and resting areas, feeding areas, travel corridors, and habitat protection; Manatee Data including manatee abundance and distribution and manatee mortality; boat facilities; boating activity patterns; waterspouts areas; and manatee zones. The Commission's consideration of waterway characteristics and manatee behavior during the Brevard County rule-making process, including the geographic scope of manatee inhabitation and threat from watercraft, was reasonable and consistent with the approach taken by other resource management agencies and researchers as contemplated by the statutory purpose. Proximity and Degree of Known Boating Activities FWCC evaluated available boating activity information in assessing threat. Staff considered the general analysis of boating activity and detailed analysis of boating activity in specific portions of Brevard County as provided in the County's MPP; included therein were maps that show locations of the County's 72 marinas and 65 boat ramps, of which 27 are public ramps. Also considered was the study of Brevard County-Wide Boating Activity by Dr. J. Morris, of the Morris of Florida Institute of Technology. Dr. Morris' inquiry resulted in the following specific finding. First, Brevard County residents are the primary ones who launch at boat ramps, followed by residents of Orange, Osecola, Seminole, Indian River and Volusia counties. Second, the Inter Costal Waterways experiences increases in transient traffic during late fall and winter months, including out-of-state boats. Third, Class One boats (16 to 25 feet) are the most observed type, followed by Class A (less than 16 feet) vessels. Fourth, most boating activity occurs during weekends. Fifth, the greatest concentrations of boats were in specific areas such as NASA causeway (SR 405, Indian River), East Canaveral Barge Canal, SR 520 and the Banana River (the Merritt Island Causeway), the Pineda Causeway (SR 404, Banana River), the Melbourne Causeway (Indian River), near Grant Island Farm, the Sebastian River and the Sebastian Inlet. Dr. Morris concluded that the boating public preferred to cruise the waters of the lagoons with the marked channels and use Indian and Banana Rivers as highways for recreational boating purposes. The United States Fish and Wildlife Service (USFWS) closed a portion of the northern Banana River within the Merritt Island National Wildlife Refuge to public boat entry, limiting public entry to wading or by non-motorized vessels. The closed area has one of the largest concentrations of manatees in the United States, and recently has been the most important springtime habitat for the east coast manatee population. As a result of the March 1990 closing to motorized boats, an average increase of manatee use observed during the summer months in the area increased by 60 percent. The increased use is attributed to improved habitat quality aided by the lack of human disturbance and reduced propeller scarring of sea grass. In December of 1994, Dr. Morris submitted a report, "An Investigation of Compliance to Boat Speed Regulations in Manatee Protection Zones in Brevard County, Florida." This report contained an analysis from on-water and aerial observations in both "slow speed" and "idle speed" zones in various areas of Brevard County for a one-year period of April 1993 to April 1994. At Mosquito Lagoon, of 1,214 boats observed, speeds were clocked for 98 percent of the boats and 11 percent of those exceeded the posted Inter Costal Waterways 30 MPH speed limit, all of which were recreational boats. At the Indian River site between Grant and Sebastian, 2,511 boats were observed, speeds were clocked for 97 percent of the boats and 16 percent of those exceeded the posted ICW 30 MPH speed limit. In posted "slow speed" zones outside the ICW channel, 25 percent of boats observed underway were deemed non- compliant with the speed zone limitation. Of those non-compliant Class A powerboats, the violators were typically personal watercrafts ("Jet Ski" type vessels.) A detailed boater activity study was made of the Canaveral Barge Canal and Sykes Creek Area. The study found, in part, that: highest boating use occurred during holidays, except during bad weather; most use occurred on weekends; and in Canaveral Barge Canal and Sykes Creek 63 percent of the vessels were Class 1 boats and 74.3 percent of the vessels were Class 2 or Class 3 boats. INCREASED LEVEL OF BOATING ACTIVITY IN BREVARD COUNTY In general, the level of boating activity in Brevard County continues to increase with the increasing population, launching facilities, and boat registrations in Brevard County and nearby counties, including Orange and Seminole counties. In 2000, 34,316 vessels were registered in Brevard County. In the preceding year there were 31,842 vessels registered. In 1995, 28,147 boats were registered and in 1987, 23,352 boats were registered in Brevard County. In 2000, Florida registered 840,684 recreational vessels, an increase over the 695,722 vessels registered in 1994. Boating accidents increased with the increased registration of vessels with Brevard County ranking 10th out of the state's 67 counties with the number of boating accidents. Brevard County, since mid-1990's, has registered an increased number of "flats skiffs" which are shallow draft, low profile motorboats capable of speeds up to 50-60 MPH while operating in shallow (about 1 foot) water and often used for sight-fishing in shallow sea grass flats. SEASONAL AND/OR YEAR-ROUND PATTERNS OF MANATEE USE AND THE NUMBER OF MANATEES KNOWN OR ASSUMED TO OCCUR IN, OR SEASONALLY USE THE AREA FWCC staff evaluated whether seasonal restrictions could or would be effective. Staff concluded that the only seasonal regulation of motorboats justifiable by the data was at the power plant discharges in the Indian River. At those locations, extreme concentrations of manatees are regular during the cold season. Year-round manatee protections were proposed for this area, but they would have to be more restrictive during the winter months. During the coldest periods of winter, following a strong cold front, manatees have been observed in large concentrations in: the power plant discharges at Florida Power and Light Company's Indian River plant and at the adjacent Reliant Energy Plant and the Sebastian River Canal. The congregation of manatees at thermal refuges on cold winter days was not for the duration of the winter season. They have been known to leave the thermal refuge for a part of a day, a day, or for many days at a time. Sharon Tyson, observer, performed a detailed Brevard County Manatee Photo-Identification Project during late 1999 and early 2000 at the Brevard County power plants, and documented a number of manatees in the FPL discharge zone between December 24, 1999, and March 4, 2000. During that period the number of manatees in the zone varied greatly, through late-December to mid-January (from 7 to 57 manatees). On January 16, 2000, no manatees were present. On January 17, 2000, 10 manatees were present. On January 23, 2000, 29 manatees were counted. Two weeks later, February 6, 2000, 111 manatees were present. Similar sightings made at the C-54 Canal Structure (near Sebastian Creek), during the same time-period, found as few as 11 manatees to as many as 90 manatees. Apart from the extreme concentration of manatees during extremely cold periods, manatees are distributed through the county waterways during each season of the year. The 1997-1999 Brevard County Aerial Survey GIS Plots gave a clear representation of year-round manatee distribution patterns varying greatly. MANATEE MORTALITY TRENDS WITHIN THE AREA Only in rare cases is the approximate or actual location of a manatee and motorboat collision known. The FWCC considered and relied upon a review of the general trend of watercraft-related (and other) mortality County-wide to assess a generalized increased mortality trend. In doing so as part of the rule-making process, FWCC reviewed total manatee mortality for Brevard County for the period for which records existed from 1974 to 2000. That data base source indicated increasing watercraft mortality in recent years. FWCC evaluated manatee salvage data for January-March 2001 and preliminary information for April-May 2001. Staff employee, Scott Calleson's working file mortality information was reviewed and considered as was Dr. Ackerman's "Mortality Rates White Paper," which concluded that human-caused manatee mortality levels were at an unsustainable rate in the Atlantic, Brevard County, Tampa Bay, and Southwest Florida Regions. The Florida Inland Navigation District provided documentation that was considered in the FWCC rule making that included a regional evaluation of "Watercraft Related Manatee Deaths in the Nine Critical Counties of FIND" from 1990-1999. Of these nine critical east coast counties, Brevard County had the highest mortality trend. During the last two-to-three years, there has not been a clear trend of increased manatee mortality in Brevard County, but the number of watercraft-related mortalities is capable of being reduced, in part, through improved regulations. Historical manatee mortality data for Brevard County from 1977 through 2000 demonstrates a clearly increasing trend in watercraft-related manatee mortality. For each five-year increment, water-related manatee mortality has increased as follows: from 1977-1979 there were an average of 1.9 water-related mortalities/year; 1980-1985 there were 4.6 mortalities/year; 1986-1990 there were 7 mortalities/year; 1991-1995 there were 8.8 mortalities/year; and 1996-2000 there were 11.8 mortalities/year. EXISTENCE OF FEATURES WITHIN THE AREA THAT ARE ESSENTIAL TO THE SURVIVAL OF, OR KNOWN TO ATTRACT, MANATEES SUCH AS SEAGRASSES, FAVORABLE WATER DEPTHS, AND FRESH OR WARM WATER SOURCES Dr. Deutsch stated that his telemetry analysis indicated that the most important habitat correlation for Brevard County manatees was with sea grass, and in particular, often with outer edge of sea grass beds. Manatees prefer feeding on submerged, emergent and floating vegetation, generally in that order. Manatees extensively use Brevard County sea grass beds for feeding. Sea grass coverage is depicted on the Florida Department of Environmental Protection's Boater's Guide to Brevard County, which has no date, but was prepared by the DEP. Sea grass coverage in 1989 is depicted in the 2000 maps prepared by the STMC, using the Atlas of Marine Resources, Versions 1.2 and 1.3b. The most recent St. Johns River Water Management District sea grass coverage data for the Indian River Lagoon indicates a strong correlation between sea grass coverage in waters with an average depth of 66.93 inches (1.7 meters) or less. As of 1992, of the estimated 46.190 acres of sea grass in Brevard County, nine percent of the sea grass suffered light scarring from boat activity; 4.2 percent of the sea grass suffered moderate scarring; and 13.4 percent of the sea grass suffered severe scarring. Areas with boat scarring of sea grass included a number of areas that are included within proposed "slow speed" zones: the eastern portion of Turnbill Basin; the eastern shoreline of the Indian River between the NASA railroad bridge and Rinkers Canal; the Banana River around Manatee Cove and south of the City Golf Course; the northwest part of Newfound Harbor; and the western shoreline of the Banana River, between Newfound Harbor and Pineda Causeway. The location of the proposed manatee protection zones corresponds well to the location of sea grass beds, deeper waters and channels adjacent to sea grass beds or established migratory routes, and fresh warm water sources. FAVORABLE WATER DEPTHS Dr. Deutsch stated that his telemetry analysis indicated that bathymetry is an important habitat correlate for Brevard County. Generally, tagged manatees were observed in the area from a two-meter (6.65 feet) depth contour to the shoreline. FWCC consideration of "favorable water depths" took into account the fact that water levels fluctuate in the Indian River Lagoon. However, unlike many coastal areas of Florida, the Indian River Lagoon does not experience significant daily tidal fluctuation. On an annual basis, however, the water level fluctuates about 2.5 to 3 feet in response to environmental conditions. It was determined to be impractical to amend manatee protection rules (and to move regulatory signs implementing the rules) in response to changing water levels. Manatees usually swim between one to three meters (3.28 to 9.84 feet) below the surface, surfacing every few minutes to breathe, and typically feed at just below the surface to a depth of three meters. Manatee experts, including persons with extensive experience observing manatee behavior in Brevard County, all testified that manatees used areas where the water level at the time was less than three feet for mating, feeding, fleeing a pack of male manatees, and resting. The FWCC used a bathymetric survey prepared on behalf of the St. Johns River Water Management District for purposes of establishing preferred sea grass habitats during the rule-making and considered the bathymetry in conjunction with other data to predict areas where manatees are likely to inhabit. The St. Johns District advised the FWCC staff that the 1.7-meter depth on its bathymetric survey was the rough depth limit for sea grass, and provided the FWCC staff with a GIS file on the bathymetric survey at 0.3-meter depth intervals for most areas, although the approximate sea grass contour was shown as 1.5 to 1.7 meters. Surveys are tied to a horizontal datum and a vertical datum. A survey depicts the three-dimensional lagoon basin, part of the spheroid planet Earth, on a two-dimensional map. The hydrographic survey data used by the FWCC in the rule-making was based upon a survey tied to a horizontal datum - North American Datum (NAD) 83/90; and a vertical datum - North American Vertical Datum of 1988 (NAVD-88). The horizontal and vertical accuracy of the survey differs. Positional accuracy of horizontal (e.g. shorelines) points is within 1 to 5 meters (3.28 to 16.4 feet). Vertical accuracy of depth data points averages within .03 feet. The hydrographic survey states that it is not to be used for navigation - - "The use of NAVD-88 for the bathymetric survey gives the impression of deeper water than is actually present within the lagoon since the "0" contour of NAVD-88 is located on dry land approximately 1 foot above the ordinary water line." Manatee distribution from aerial surveys and 1992 bathymetry data was graphically depicted by the STMC and confirms manatee use of areas proposed for regulation in the proposed rules. FRESH WATER SOURCES FWCC considered and relied upon major fresh water sources that have been historically used by manatees such as: Turnbull Creek; Titusville Marina/POTW; Addison Canal; the two Indian River power plants; two wells along the eastern shoreline of the Indian River approximately two miles south of Rinkers Canal; the intersection of Bacardi and Dakar Drive in Sykes Creek; the Cape Canaveral POTW (sewer plant); the Banana River Marina; the outfall into the Indian River from the east shore of Merritt Island westerly of the south end of Newfound Harbor; the Indian River Isles; the Eau Gallie River; Crane Creek; Turkey Creek; and the Sebastian River. Also considered were less significant sources of fresh water found at many marina basins, at the Sear Ray Boats, Inc. facilities and in residential canals. WARM WATER SOURCES FWCC considered major warm water sources in the two Indian River power plants and the Sebastian River Canal. Minor sources of warm water include deeper water and areas with artesian springs such as: Port Canaveral; a basin off Wynar Street in Sykes Creek; the Banana River Marina; and the Berkeley Canals. CHARACTERISTICS OF THE WATERWAY IN QUESTION IN RELATION TO KNOWN BOATING ACTIVITY PATTERNS FWCC considered, as its basic source document, Morris' Final Report for Brevard County Boating Activity Study. Boating activity patterns in Brevard County are dependent upon weather, economic conditions, and other factors. Larger motorboats (including tug/barge combinations) are constrained in movement to deeper water--in some areas, primarily within marked or maintained navigation channels including the Canaveral Locks, Canaveral Barge Canal, ICW, and Banana River main channel. In the Indian River, south of the NASA railroad bridge, the deeper area outside of the marked channel widens to between half-a-mile to a mile with depths ranging from seven to 12 feet MLLW, all the way to Rock Point, just north of Grant. For most of the length of the County, larger boats have sufficient water depth to travel adjacent to the ICW channel. Waters outside the main channel in the Banana River are relatively shallow. The Canaveral Barge Canal is dredged to maintain a depth of approximately 15 feet. Barges and escorting tugs navigate through the Canaveral Locks and into the ICW. Some barges proceed northward from the Canaveral Locks into the Banana River channel to make deliveries to the Space Center, according to the Lockmaster, Mr. Querry. Sea Ray Boats, Inc.'s, design and production facilities located along the Canaveral Barge Canal use the Canal to access testing areas to the west in the Indian River ICW, to the east in the Banana River channel, and in the Atlantic Ocean. Limited retests are permitted in an area adjacent to the Canaveral Barge Canal facilities. Recreational motorboats and personal watercrafts can be operated outside of marked channels. Some of these recreational motorboats can navigate "on plane" and up to 60 MPH in water about one-foot deep. Motorboat users engage in a variety of activities having differing operational patterns. Fishers might prefer to travel at relatively high speed enroute to preferred fishing areas, and then operate with a push pole, trolling motor or adrift, in order to hunt certain species of fish. If no fish are located, then high-speed operation to another spot is used, repeating the pattern of locating fish by sight. Water-skiers usually operate at high speed in a relatively small area, usually protected from the wind, and often located near an island or park. BOAT-MANATEE INTERACTIONS FWCC considered that manatees display varying reactions to motorboats. Higher speed motorboat operation in relatively shallow water presents a greater threat to manatees than operation at slow speed or idle speed or than operation in relatively deeper waters, since manatees have fewer opportunities to avoid the collision. Manatees can swim or rest at the surface or underwater and must come to the surface to breathe air every two to three minutes for smaller, active manatees and up to 20 minutes for large, resting manatees. Their general cruising speed is two to six miles per hour, but they can travel at short bursts up to 15 MPH. Boats operated at "slow speed" vary in miles-per-hour over the bottom within a range of about seven to eight miles-per- hour. At "slow speed," the manatee and vessel operator have more time to avoid collision, or the manatee can avoid serious blunt trauma injury from collisions with most vessels. The ability of manatees to avoid being hit by motorboats has diminished in Brevard County as a result of an increase in the manatee population, increase of motorboats, increase in boating access points, and development and use of faster boats that operate in less-predicable (non-linear) patterns in relatively shallow waters where manatees often feed on submerged vegetation. TESTIMONY REGARDING MOTORBOAT-MANATEE INTERACTION Officer Dennis Harrah, qualified as expert in boating safety, marine law enforcement, and local knowledge of the waterways of Brevard County, testified that "slow speed" zones provide greater reaction time for the vessel operator to avoid collision than unrestricted speed areas and than the "25 MPH maximum speed" areas. He further testified that "idle speed" zones provide greater reaction time for vessel operators to avoid collision than "slow speed" areas. Dr. John Reynolds, qualified as expert in marine mammal conservation and policy, manatee biology and behavioral ecology of marine mammals, opined, based on frequent observation of motorboat-manatee interactions, review of videotapes of such interactions, and review of studies on the subject, that there is an increased threat to manatees associated with boats that operate in planing speeds as opposed to slow speeds. His opinion is based, in part, on "common sense" that objects moving faster have greater momentum and therefore greater magnitude of impact, and on the reduced reaction time of both vessel operators and manatees to avoid collision. Dr. Reynolds was not aware of any evidence to suggest that the majority of watercraft strikes to manatees are from vessels operating at "slow speed," and it is his belief that "a good percentage of manatee mortality was from fast-moving vessels." Ms. Spellman, qualified as expert in marine biology and in manatee rescue and salvage, testified that she had observed considerable variability in manatees' reactions to kayaks, canoes and windsurfers, including manatees approaching the vessel, manatees not reacting at all, and manatees swimming away. She has observed manatee reactions to small motorboats as highly variant, depending upon the animal, including: swimming under a slow-moving motorboat, moving just as a motorboat approaches at idle speed, or diving and leaving the area as soon as a motorboat got anywhere near. Ms. Spellman testified, based upon her presence in the waters of the Canaveral Barge Canal or in the Port east of the Locks, that she has been in the water with manatees on five occasions when a barge/tug combination came by and in all cases the manatees reacted to the barge well in advance of the barge coming near her and the manatee, and that in each instance the manatee swam to within 15 to 20 feet of the shoreline. Of the thousands of times that she has seen manatees, she estimated that 95 percent of the time the manatees had scars from boat propellers or skegs. Dr. Powell testified, based upon over 30 years of observation of boat-manatee interactions, that the typical reaction is a flight or startle response, often to dive to deeper water. The diving response may take the manatee under the boat, away from the boat, or across the path of the boat. Based on his observations, including manatees reacting to motorboats moving at "idle-speed," "slow-speed" and at "faster-speeds," Dr. Powell opined that the manatees' reactions resulted from acoustical cues, visual cues, and perhaps pressure cues. Captain Singley, tugboat operator in Brevard County for over 30 years, observed a group of manatees react to a fast moving planing hull; some animals broke the surface, others scattered to the right or left, and others dove to the bottom. Mr. Walden, Sea Ray's Boat, Inc.'s, performance and water test specialist, testified that he had observed manatees in the Barge Canal, and sometimes the manatees would react to the motorboat. The majority of time when the boat was operating at planing speed or faster the manatee would dive and go deeper, and would began evasive action, upon hearing and noticing the motorboat a couple of hundred feet away. Dr. Gerstein testified that fast moving boats can hit manatees and that he was not aware of any physical evidence, eye- witness account, or law enforcement report of a slow-moving boat hitting a manatee. STUDIES ABOUT MOTORBOAT-MANATEE INTERACTION KNOWN BOAT STRIKES FWCC considered that watercraft collisions with manatees are rarely reported to authorities, and, as a result, it is difficult to directly assess the circumstances of such collisions, such as boat size, type and speed at the time of collision. A summary entitled "Watercraft-related Manatee Deaths Where the Responsible Vessel is Known," indicates that barges, displacement hull vessels, and planing hull vessels are known to have been in fatal collisions with manatees. In those planing- hull incidents where the vessels and estimated speed are known, the speed of the vessel ranged from getting-up-on-plane (45-foot boat with twin 425 HP outboard motors) to 35 MPH (18-foot boat with 150 outboard motor). Two other incidents were a 46-foot boat with twin inboard motors operating at 18 knots and a 20- foot boat with 200 HP outboard operating at 20 MPH. The only indication that a slow-moving planing-hull vessel struck a manatee is a report from an individual who was operating at estimated five MPH in a flat hull vessel and reported to have "felt a bump on aft hull, saw two animals (manatees) swam off." PROTECTION OF MANATEE-SEA GRASS HABITAT FWCC considered protection of sea grass habitat a secondary purpose in the Proposed Rule for areas subject to Section 370.12(2)(m), Florida Statutes. The Florida Guide To Recreational Boating notes that: Sea grass beds have been severely scarred (torn up) by boats operated in extremely shallow water. This is due, in part, to the "flats fishing craze" and the rising popularity of vessels designed to operate in shallow water. The Guide recommends that operators set the boat's drive unit at the highest possible setting and that the operator "proceed at idle speed when moving through shallow grass beds." Dr. Reynolds testified that "idle speed" or "slow speed" shoreline buffer zones provide greater sea grass protection (and manatee conservation) than higher motorboat speeds. The Executive Director of the Indian River Guides Association testified that the group is promoting "pole and troll" areas within the Merritt Island National Wildlife refuge portions of the Indian River Lagoon. He stated that many people from Orlando and elsewhere bring their boats by trailers to Brevard County, or move to Brevard County, and operate their boats so as to tear up seagrass beds. FWCC correctly concluded that "slow speed" and "idle speed" zones provide a greater measure of protection to shallow seagrass beds than do higher speeds for motorboats. DATA SOURCES CONSIDERED BY FWCC IN PROMULGATING THE PROPOSED RULE Differing Opinions About Manatee Protection Areas FWCC's Opinion The FWCC, based on the following, took the position that the proposed rules are more likely to protect manatees from motorboat impacts than the existing rules, and that the proposed rules take advantage of the available science of manatee biology and conservation, using the same basic approach used in manatee conservation by officials in Australia to protect dugongs (another Sirenian) from motorboats. The FWCC postulates that "idle speed" and "slow speed" zones provide greater protection to manatees than do higher motorboat speeds. "Maximum 25 MPH" speed zones in deeper water areas provide greater manatee protection than do unregulated waters. Most motorboats observed operating in unregulated areas (outside "slow speed" or "idle speed" zones) in Brevard County, during Dr. Morris' boating compliance study, were operating at or below 25 MPH. The FWCC correctly concludes that "maximum 25 MPH" speed was reasonable in light of research into the minimum planing speed of most recreational motorboat models, the observations of typical motorboat speed and operation in unregulated waters of Brevard County. The FWCC considered 1997 DEP-solicited information from motorboat manufacturers to determine minimum planing speeds and maximum planing speeds, and draft on- and off-plane for various sizes and types of motorboats. Considered also by the FWCC was boating test literature to determine that most boat models could reach planing speed at or slightly below 25 MPH. The FWCC considered information that was submitted showing that many production boats reached planing speed between 20-25 MPH. For example, Scout Boats' 11 models planed between 20- 25 MPH, and Shamrock's 13 models planed between 20-25 MPH. The Florida Marine Research Institute's 1992 information on this topic found a range of minimum planing speed between 14 and 24 MPH. Motorboats operating at speeds higher than 25 MPH are many. Ranger Boats offered several models with maximum speed in the "upper 60's" to "low 70's"; Scout Boats' models had top speeds of 35-60 MPH; Shamrock's models ran at the top end between 36-41 MPH; Donzi Boats operate at speeds in the 70 MPH range; and Bayliner's Capri 1700LS had a top speed of 46 MPH, as did Stingray's 180RS. Since the FWCC's creation, speed zone rules adopted for Lee County included maximum 25 MPH zones. Rule 68C-22.005, Florida Administrative Code for Brevard County has regulated motorboats with a "maximum 25 MPH" speed in channels. Commission staff applied their professional judgment in developing recommendations on manatee protection areas, and presented those recommendations to the FWCC, who considered staff recommendation, in context with public comment, to determine what manatee protections were warranted. PETITIONERS' OPINIONS The various Petitioners advocate manatee protection zones that, in many cases, are similar to the FWCC's proposed rules, including "slow speed" shoreline buffer zones and "maximum 25 MPH channels." Petitioners' challenge to many of the protection zones alleges that FWCC's basic regulatory mechanisms are flawed. FEDERAL LAWSUIT-SETTLEMENT AGREEMENT On or about January 13, 2000, STMC and other related environmental groups filed a lawsuit in the Federal District Court against Alan Egbert as Executive Director of the FWCC. The suit alleged, inter alia, that the FWCC is in violation of the Endangered Species Act by permitting the unauthorized taking of manatees in the State of Florida. During the pendency of the litigation, FWCC engaged in a series of mediations resulting in a settlement agreement approved by FWCC and executed by the parties in April 2001. The agreement contained a series of maps with draft manatee (speed) zones for Brevard County. Petitioners alleged that "the genesis of the Proposed Rule is this settlement agreement reached in the Egbert case, and there is a definite connection between the language of the Proposed Rule being challenged and the settlement agreement." Petitioners' speculative conclusion regarding this suit was tendered without one iota of evidence. Mr. Calleson, FWCC's staff employee, acknowledged that portions of existing speed zones and proposed speed zones in maps resulting from the federal mediation process contained a "lot of similarities" with speed zones in maps of the proposed rule. Mr. Calleson acknowledged that the FWCC did not direct staff to conduct negotiated rule-making on the proposed rule, and staff participation in the federal mediation process was not a negotiated rule-making process pursuant to Section 120.54(2), Florida Statutes, which provides, in pertinent part: (d)1. An agency may use negotiated rulemaking in developing and adopting rules. The agency should consider the use of negotiated rulemaking when complex rules are being drafted or strong opposition to the rules is anticipated. The agency should consider, but is not limited to considering, whether a balanced committee of interested persons who will negotiate in good faith can be assembled, whether the agency is willing to support the work of the negotiating committee, and whether the agency can use the group consensus as the basis for its proposed rule. Negotiated rulemaking uses a committee of designated representatives to draft a mutually acceptable proposed rule. * * * 3. The agency's decision to use negotiated rulemaking, its selection of the representative groups, and approval or denial of an application to participate in the negotiated rulemaking process are not agency action. Nothing in this subparagraph is intended to affect the rights of an affected person to challenge a proposed rule developed under this paragraph in accordance with s. 120.56(2). THOMAS MCGILL PETITIONERS Most of the McGill Petitioners support the adoption of rules that are consistent with the Citizens for Florida Waterway, Inc. (CFW), proposal submitted on December 29, 2000. The CFW proposal endorsed the use of "slow speed" zones, the use of "maximum 25 MPH zones," existing power plants "idle speed" and "motorboat prohibited" zones, and the use of shoreline buffers. The CFW proposal differed from the proposed rules primarily in scope of the proposed zones, rather than the nature of the proposed zones. The CFW proposal recommended numerous 25 MPH channels (in marked channels) through protected areas: from the Canaveral Locks through the Canaveral Barge Canal to the Indian River (except for three slow-speed boating safety zones); in North Sykes Creek; in the Banana River north of State Road 528 and between Bicentennial Park to the State Road 520 Relief Bridge. STANDING WATCH, INC. Stowell Robertson, one co-Petitioner of Standing Watch, Inc., is Executive Director of the Indian River Guides Association, Inc. (Guides). Mr. Robertson wrote the Guides' Recommendations, but his personal recommendation differed in two respects: in the North Indian River between NASA railroad bridge and the State Road 405 bridge, he would establish a "slow speed" zone from the western shoreline out to 500 feet (instead of 300); and he would impose a maximum 25 MPH speed in the Canaveral Barge Canal instead of 20 MPH. The Guides recommended that motorboat speed and operation be limited as follow: Mosquito Lagoon-make no changes to existing rule Turnbull Basin, North Indian River Create two "slow speed" zones in Turnbull - one in the Mimms Scottsmoor Canal, another from Jones Road boat ramp to Little Flounder Creek from the shore to 100 feet into the Basin; Set a new "slow speed" zone on the north side of the NASA railroad causeway and bridge out to 250 feet; Set a maximum 25 MPH in the ICW from Haulover Canal to the NASA railroad bridge; Take no further action [to change regulations]. Indian River, NASA railroad bridge to S.R. 402 Place "slow speed" zones on the south side of the NASA railroad bridge and causeway out to 250 feet; Reduce the [existing] west shoreline "slow speed" zone so that the western boundary is 350 feet from the ICW between markers R2 and G1; Set a maximum 25 MPH in the ICW; Take no further action [to change regulations] Indian River, State Road 406 to State Road 402 (1) and (2) Replace eastern "slow speed" zone with reduced "slow speed" zone extending from Peacock's Pocket to the existing "slow speed zone north of the State Road 405 Causeway, extending from shore to 250 feet west of the sand bar/drop off or three feet of water; Reduce the size of the "slow speed" zone north of State Road 405 Causeway to 300 feet; Reduce the size of the existing western shoreline "slow speed" zone to 500 feet from shoreline; Take no further action [to change regulations]. Indian River, State Road 405 to State Road 528 Bridge Close the warm water refuge sites at the power plants to manatees, not to boats; Deliver fuel to the power plants by land; Reduce the existing "slow speed" zone on the western shoreline to 1,000 feet from the shore; Take no further action [to change regulations]. Canaveral Barge (and Banana River to Locks) Maximum 20 MPH channel from Indian River to entrance to Canaveral Locks with "slow speed" zones at 100 feet either side of State Road 3 bridge, Sea Ray docks, Harbor Square Marina; Take no further action (to change regulations). Banana River (1) (2) All waters of Banana River, including channels, not otherwise regulated at "slow speed" should have 25 MPH limit; Reduce all existing "slow speed" zones along east and west shorelines, causeways, and bridges to 500 feet of shore; Retain existing "slow speed" zones in the two channels into "Long Point"[north and south ends of Canaveral Sewer Plant area]; Take no further actions [to change regulations]. Newfound Harbor (1) (2) All waters of Newfound Harbor, including channels, not otherwise regulated at "slow speed" should have a 25 PMH daytime limit and 20 MPH nighttime limit; Establish a "slow speed" zone along western shoreline from State Road 520 south to Two Islands; Establish a "slow speed" zone along eastern shoreline from State Road 520 south to the inside point north of Buck Point; The east and west "slow speed" zones be 500 feet from shorelines, and 200 feet[along northern shore] from S.R. 520; Take no further action. Sykes Creek North State Road 520 Set speed limit in marked channel at 20 MPH; All residential canals should be "slow speed"; Take no further action. Indian River State Road 528 to State Road 520 Establish 500 foot "slow speed" zones along western and eastern shorelines and 200 feet from causeways and bridges; Take no further action. Indian River State Road 520 to State Road 404 Establish 500 foot "slow speed" zones along western and eastern shorelines and 200 feet from causeway bridges; Take no further action. Indian River State Road 404 to State Road 518 Establish 500 foot "slow speed" zones along western and eastern shorelines and 200 feet from causeways and bridges; Take no further action. Indian River State Road 518 to State Road 192 Establish 500 foot "slow speed" zones along western and eastern shorelines and 200 feet from causeways and bridges; Establish Eau Gallie River "slow speed" zone with 20 MPH speed limit in marked channel daytime only, "slow speed" at night; Take no further action. Indian River (1) Establish 500 foot "slow speed" zones along western and eastern shorelines and 200 feet from causeways and bridges; (2)-(5) Crane Creek, Turkey Creek, St. Sebastian River, C-54 canal should be "slow speed"; Take no further action. Mr. James Kalvin, Standing Watch co-Petitioner and also President of Standing Watch, Inc., testified at deposition that neither he, nor the corporation, had any objection to the existing Brevard County manatee protection rules. SPECIFIC PROPOSED ZONES CHALLENGED The Petitioners' Challenge All Petitioners challenged the validity of Proposed Rule 68C-22.006, as "an invalid exercise of delegated legislative authority" as that phrase is defined in Section 120.52(8), Florida Statutes. MCGILL PETITIONERS The McGill Petitioners challenged the proposed rule amendment for Brevard County manatee protection areas, Proposed Rule 68C-22.006 (2)(d)2, 5, 6, 7, 8, 11, 12, 13, 14, 15, 16, 17, and 18, as an invalid exercise of delegated legislative authority. They allege that additional slow speed zones in Brevard County are invalid because the FWCC exceeded the authority granted in Section 370.12(2), Florida Statutes. McGill Petitioners based their allegations on the FWCC's lack of definable principles or data and an erroneously assumed cause-effect relationship for boat-manatee collisions, failure by the FWCC to consider the hearing limitations and capabilities of manatees in their environment, and a failure by the FWCC to employ standards and definitions for critical terms in its rule promulgation. At the final hearing, McGill Petitioners agreed that they do not object to that portion of Proposed Rule 68C- 22.006(2)(d)15 that reduces the width of the slow-speed zone in the Banana River between State Road 528 and State Road 520 causeways. Petitioners do, in fact, object to removal of the 25 MPH exemption for residential channels. The McGill Petitioners' position as set forth in their Prehearing Stipulation states: The Florida Fish and Wildlife Commission has exercised unbridled discretion and acted beyond the authority delegated in 370.12(2)(m), Florida Statutes, and has developed the proposed rule in an arbitrary and capricious manner. The proposed rule exceeds the delegated legislative authority because it is not based on scientifically definable principles or data. By failing to understand the root cause of watercraft mortality such as the manatee's inability to hear slow moving vessels, the Commission cannot deem their actions "necessary" to justify imposing speed restrictions as required by Section 370.12(2)(m), Florida Statutes. The Commission continues to impose speed motorboat restrictions even after finding that such restrictions are ineffective at preventing manatee mortality. The Commission relies on a flawed mortality database, a poor understanding of the limitations and applicability of satellite telemetry data, and lack of standards and definitions for critical terms. [emphasis added] The McGill Petitioners' Amended Petition alleged in paragraph 6: The Commission has not employed the best available science or even reasonable science. . . . aerial survey and telemetry data were misapplied. . . . in that areas that did not reflect frequent usage . . . were designated . . . slow speed zones. Also, the use of inaccurate telemetry tracking information was used as the basis for justifying areas where aerial survey data showed no manatee activity. . . . In support of their alleged inaccuracy of the satellite telemetry data, Petitioners presented the testimony of Mr. Dvorak and his Power-point Presentation of Aerial Survey Mortality, Telemetry and Bathymetry Assessment, and other technical papers. Mr. Dvorak did not include in his presentation/analysis survey data available on the Atlas or Marine Resources and did not include all telemetry data available from the United States Geological Survey, which was included in Dr. Deutsch's analysis presented for Respondent, FWCC. The Amended McGill Petition, paragraphs 10 and 12, stated: The McGill Petitioners advised the FWCC that creation of new "slow speed" zones was based upon incorrect assumption "that such slow speed zones alleviate collisions between vessels and manatee" and they suggested that "slow moving vessels are responsible for the majority of documented manatee collisions." McGill Petitioners' evidence proffered to demonstrate that "slow moving vessels are responsible for the majority of documented manatee collisions," consisted of inclusive studies and undocumented theories to demonstrate that slow speed zones do not alleviate collisions between vessels and manatees. FWCC considered an abundance of the best evidence of known or suspected collisions between vessels and manatees that demonstrated that "fast moving motorboats" are a known major source of manatee- vessel collisions. The McGill Petitioners further stated in paragraph 11 that: The rule does not consider the acoustic realities of the manatee's hearing limitations and its environment. McGill Petitioners presented the testimony of Dr. Edmund Gerstein regarding his measurements of the manatees' ability to hear noises. Dr. Gerstein concluded from his research that manatees have difficulty hearing and locating low-frequency sounds (below 400Hz), and they have difficulty detecting sounds of any frequency when it is not sufficiently louder than the ambient noise level. The testimony of Dr. Joseph Blue was given in support of the McGill Petitioners' position that low-frequency sounds are quickly attenuated in shallow water because of the Lloyd Mirror effect. Upon this foundation, Dr. Blue testified that since sound is shadowed ahead of the barge(s), the tugs that push the fuel oil barges between Prot Canaveral and the power plants on the Indian River emit low-frequency sound that is shadowed in the forward direction by the barge(s) and it would be undetectable to animals. Thus, the McGill Petitioners' witnesses concluded that there are acoustic consequences associated with slowing down boats. According to Dr. Gerstein, requiring motor boats to travel a slow speed deprives manatees of acoustic information they can use to detect, localize, and avoid boats. It is this "science of acoustics" Petitioners alleged that the FWCC gave no weight in promulgating the proposed rule. The FWCC considered the issues raised by acoustic studies. The FWCC's Executive Director was advised on the subject by the Manatee Technical Advisory Committee (MATC) whose recommendation resulted from a workshop on acoustic research and technology with presentations of the work of Drs. Gerstein and Blue. No reliable scientific sources, professional literature, expert opinions, and direct observations of manatee reactions to motorboats, supports the proposition of Drs. Gerstein and Blue that manatees cannot hear slow-moving motorboats. The FWCC rejected the studies of Drs. Gerstein and Blue. McGill Petitioners' alleged in paragraphs 3, 4, 13, and 14, of their Amended Petition that the FWCC did not provide a reasonable opportunity for and ignored much of the public's input. In their Prehearing Stipulation, the McGill Petitioners' acknowledgement of public hearings held by FWCC and the opportunity for pubic input during those hearings. There is an abundance of evidence in the record that demonstrates that the FWCC staff held non-mandatory pre-rule development meetings with interested persons, including some of the McGill Petitioners. The Staff held two rule development workshops in Brevard County. Staff held a public hearing specifically on the Proposed Rules in Brevard County. Staff considered the rule adoption at many hours of public hearings on three different dates and locations. Staff mailed special notices regarding the Proposed Rules to all identified waterfront property owners of whom many are the McGill Petitioners, and Staff mailed a series of survey documents to identified boaters and businesses in conjunction with the preparation of a statement of estimated regulatory cost. (CSERC) In paragraphs 7 and 9 of their Amended Petition, the McGill Petitioners alleged that the FWCC entered into a Negotiated Rule-Making Process with litigants to the exclusion of a balanced committee in violation of 120.54(2)(d)1., Florida Statutes. Section 120.54(2)(a), Florida Statutes, authorizes an agency to engage in development of a "preliminary text" or "preliminary draft" of proposed rules prior to the publication of a notice of rule development. Preliminary maps of amendments to the BCMPR were similar to maps being discussed as part of the federal mediation. This fact alone is not a basis to conclude violation of the above-cited statutes. A second rule development workshop was noticed to discuss a preliminary copy of the Staff's "zone configuration" being considered. Subsequent to the second workshop, the FWCC authorized publication of Notice of Proposed Rule-making that incorporated changes to the preliminary draft maps that were discussed at the workshop. The McGill Petitioners, during the hearing, agreed that they do not object to that portion of Proposed Rule 68C-22.006(2)(d)15 that reduces the width of the slow-speed zone in the Banana River between State Road 528 and State Road 520 causeways. Petitioners do, in fact, object to removal of the 25 MPH exemption for residential channels. Petitioners offered no testimony in support of this allegation, choosing rather to adopt the evidence and position proffered by Standing Watch, Inc., herein below addressed. In paragraphs 5 and 15 of their Amended Petition, the McGill Petitioners alleged that the Commission did not properly address the consideration of lower cost regulatory alternatives. The "lower cost regulatory alternatives" submitted by McGill, Pritchard and Dvorak were considered and were discussed in the draft SERC. The draft SERC gave reasons for the rejection of each of the proposed "lower cost regulator alternatives," primarily because none would substantially accomplish the objectives of the law being implemented. The SERC was finalized, as required by Sections 120.541(1)(a) and (c); and 120.56(2)(b), Florida Statutes, before filing for adoption with the Secretary of State. In paragraph 17 of their Amended Petition, the McGill Petitioners alleged that the FWCC failed to employ metrics or standards that could be used to validate the effectiveness of both proposed and existing rules, in rule promulgation, and that without the use of metrics, the FWCC had no way to determine and verify that speed zones they propose are necessary to protect harmful collisions with motorboats. The McGill Petitioners proffered no evidence of specific "metrics or standards" that would validate the effectiveness of the existing and or the proposed rule they contend the FWCC could have or should have used in the Proposed Rule development. The FWCC relied upon the best available and reliable information in its rule-making, including opinions of experts. To the information available to it, the FWCC applied its professional judgment, gave consideration to public comments/concerns provided during public meetings, and considered the estimated regulatory costs and other applicable rule-making requirements. In paragraph 18 of their Amended Petition, the McGill Petitioners alleged that the FWCC repeatedly ignored requests to sub classify watercraft-related mortalities in order to properly identify appropriate corrective action. The FWCC considered all available data regarding manatee injury and death resulting from the speed of motor boats and rejected Petitioner's contention that boat size, large boats such as tugs and barges, were more dangerous to manatees than smaller and faster motorboats. Sea Ray Boat, Inc. Petitioner, Sea Ray Boats, Inc., challenged only Proposed Rule 68C-22.006(2)(d)(11) that modifies the existing manatee protection speed zones in the Canaveral Barge Canal (that is 200 feet wide with a 125-foot navigation channel maintained at a depth of 12.5 feet) such that the entire Canal will now be designated a "slow speed" zone. Sea Ray does not argue that the FWCC did not consider all available information or that FWCC's consideration of the information was not complete. Sea Ray's position is, were one to consider the information presented to the FWCC, as balanced against the federal lawsuit filed by Save the Manatee Club, Inc., the challenged Proposed Rule is the result of the latter not the former and, therefore, is an invalid delegation of legislative authority. Sea Ray alleges that the FWCC did not analyze nor address the adequacy of the existing rule and speed zones in effect in the Canaveral Barge Canal. Sea Ray alleged that the FWCC did not consider the alternative (with weekend boating increases over weekdays) whether the risk to manatees would be reduced by "restricting slow speed zones in the channel to weekend and holidays." Sea Ray alleged that the FWCC failed to apply "properly" the mandatory balancing test of the impact of the proposed rule on the rights of commercial and recreational boaters. Section 370.12(2)(j), Florida Statutes. Sea Ray argues that the FWCC's consideration of information in formulating the Proposed Rule was devoid of "ascertainable quantitative criteria, standards or analytical processes," that Sea Ray maintains is required by Section 370.12, Florida Statutes. Standing Watch, Inc. Standing Watch, Inc.'s, Second Amended Petition challenged and alleged that the proposed speed in proposed Rule 68C-22.006(2)(e) 1-5 is not based upon "competent, substantial evidence" and does not comport with Section 370.12(2), Florida Statutes. Paragraphs 38 and 39 alleged that the proposed speeds in the Proposed Rule 68C-22.006(2)(c) 1-6 and (2)(d) 1-18 are not based upon "competent, substantial evidence" and do not comport with Section 370.12(2), Florida Statutes. Standing Watch, in essence, challenges all "idle," "slow" and "25 MPH" maximum speed zones proposed. Standing Watch argues that the FWCC failed to "quantify" by rule or working definition such terms such as "frequent" and "seasonal" and failed to define the term "periodic." Therefore, without working definitions the FWCC had no "threshold" from which to determine whether manatees were "frequently sighted," and the proposed rule is, accordingly, invalid in its entirety. Thus, it is alleged that the FWCC made no independent findings based upon the data reviewed that manatees were "frequently sighted" in any specific area of Brevard County. Standing Watch alleged, "The genesis of the Proposed Rule is this settlement agreement reached in the Egbert case, and there is a definite connection between the language of the Proposed Rule being challenged and the settlement agreement." Mr. Calleson acknowledged that portions of existing speed zones and proposed speed zones in maps resulting from the federal mediation process contained a "lot of similarities" with the speed zones in maps of the Proposed Rule. The FWCC declined to direct staff to conduct negotiated rule-making on the Proposed Rule. Accordingly, staff's participation in the federal mediation process was not a negotiated rule-making process pursuant to Section 120.54(2), Florida Statutes. Continuing their argument, Standing Watch alleged that the FWCC without algorithms, formulae, protocols, matrices, mathematical models, or metrics made no separate determination for each zone and/or area (of the proposed rule) and had no factual basis for the identification of separate speed zones, rendering all determinations made by the Commission as arbitrary and capricious. Based upon the foregone foundation, Standing Watch challenged Proposed Rule 68C-22.006 in its entirety as arbitrary and capricious. City of Cocoa Beach Watersports Area Cocoa Beach intervened to challenge that portion of Proposed Rule 68C-22.006(2)(d)16, that "reduces allowable speeds in the area known as Banana River, Cocoa Beach Waterspouts Area." In support of its challenge, Cocoa Beach adopted the Proposed Final Order submitted on behalf of Petitioners, Standing Watch, Inc., Jim, Kavin, Thomas Mason, Dougals P. Jaren and Stowell Robertson. Additionally, Cocoa Beach relied upon "facts" particularly applicable to the Cocoa Beach (Waterspouts Area). Cocoa Beach alleged that prior to the Proposed Rule and subsequent to 1988 the FWCC had no evidence of manatee deaths attributed to watercrafts having occurred in the Watersports Area; that two years prior to the proposed rule only one or two manatees were sighted in that area; that the sea grass preferred by manatees is not found in the area, and that the Watersports Area does not have the depth [bathymetry] preferred by manatees. Petitioners contend that a "sub-classification" would corroborate Mr. James Wood's view "a majority of watercraft collisions are caused by large, slow-moving vessels, not by small, recreational motorboats." Mr. Wood's analysis was inconclusive as to the characteristics of watercraft that caused manatee injury. The reliable and available evidence, including documentation on known or suspected boat strikes, scar catalog data, and affidavits of persons who perform manatee necropsies, does not support the view held by Mr. Wood. To the contrary, evidence and testimony of experts herein presented, established that small, fast moving motorboats kill and injure manatees and their habitat. The sub-classification of watercraft-related mortalities is not required for rule adoption. The proposition set forth by McGill Petitioners, and adopted by other Petitioners, that larger vessels and barge/tugs were responsible for Brevard County manatee mortalities was raised in an earlier rule challenge filed by McGill, and was rejected, as it is herein rejected. DOAH Case No. 99-5366, page 18 (officially recognized); Final Order, McGill v. Fish and Wildlife Conservation Commission, 23 F.A.L.R. (DOAH 2000). All data, 1997-1999 Brevard County relative abundance and distribution aerial survey, 2000 synoptic aerial survey, telemetry analyses, other data considered, and professional literature indicated that Brevard County is an important year- round habitat for manatees.
The Issue The issue is whether the City's applications for an individual stormwater permit and a noticed general environmental resource permit for Phase 1A of the proposed Hogtown Creek Greenway should be approved.
Findings Of Fact Based upon all of the evidence, the following findings of fact are determined: Background In these two cases, Respondent, City of Gainesville (City), seeks the issuance of a stormwater system management permit (stormwater permit) to construct a 2,000-foot long asphaltic trail/boardwalk, a parking facility and associated improvements for Phase 1A of the Hogtown Creek Greenway project in the north central portion of the City. That matter is docketed as Case No. 97-2845. The City also seeks the issuance of a noticed general environmental resource permit (NGP) to construct 481 square feet of piling supported structures over wetlands or surface waters for the same project. That matter has been assigned Case No. 97-2846. Respondent, St. Johns River Water Management District (District), is the regulatory agency charged with the responsibility of reviewing and approving the requested permits. Petitioner, Greenspace Preservation Association, Inc., is a not-for-profit Florida corporation primarily composed of persons who own real property adjacent to the route proposed by the City, as well as local environmental interests. Petitioners, Frank Ward, Sal Locascio, Frederick P. Peterkin, and Harold M. Stahmer, are individuals who own real property adjacent to the route proposed by the City for the Greenway. The parties have stipulated that Petitioners are substantially affected by the District's proposed action and thus have standing to initiate these cases. On March 28, 1997, the City filed applications for a stormwater permit and a NPG for Phase IA of the Hogtown Creek Greenway project. After conducting a review of the applications, including an on-site visit to the area, in May 1997, the District proposed to issue the requested permits. On June 9, 1997, Petitioners timely filed a Petition for Initiation of Formal Proceedings as to both intended actions. As amended and then refined by stipulation, Petitioners generally allege that, as to the stormwater permit, the City has failed to provide reasonable assurance that the project meets the permitting requirements of the District; the City has failed to provide reasonable assurance that the stormwater system will not cause violations of state water quality standards; the City has failed to provide reasonable asurance that the project satisfies the District's minimum required design features; and the City has failed to provide reasonable assurance that the stormwater system is capable of being effectively operated and maintained by the City. As to the NPG, Petitioners generally allege that the piling supported structure is not less than 1,000 square feet; the jurisdictional wetlands are greater than the area shown on the plans submitted by the City; the City has failed to provide reasonable assurance that the system will not significantly impede navigation; the City has failed to provide reasonable assurance that the system does not violate state water quality standards; the City has failed to provide reasonable assurance that the system does not impede the conveyance of a watercourse in a manner that would affect off-site flooding; the City has failed to provide reasonable assurance that the system will not cause drainage of wetlands; and the City failed to provide reasonable assurance that the system does not adversely impact aquatic or wetland dependent listed species. Respondents deny each of the allegations and aver that all requirements for issuance of the permits have been met. In addition, the City has requested attorney's fees and costs under Section 120.595(1)(b), Florida Statutes (Supp. 1996), on the theory that these actions were filed for an improper purpose. A General Description of the Project The Hogtown Creek Greenway is a long-term project that will eventually run from Northwest 39th Street southward some seven miles to the Kanapaha Lake/Haile Sink in southwest Gainesville. These cases involve only Phase 1A of that project, which extends approximately one-half mile. This phase consists of the construction of a 2,000-foot long asphaltic concrete trail/boardwalk, a timber bridge and boardwalk, a parking facility, and associated improvements. The trail will extend from the Loblolly Environmental Facility located at Northwest 34th Street and Northwest 5th Avenue, to the intersection of Northwest 8th Avenue and Northwest 31st Drive. The trail will have a typical width of ten feet. For the majority of its length, the trail will be constructed of asphaltic concrete overlying a limerock base, and it will generally lie at the existing grade and slope away from the creek. Besides the trail, additional work involves the repaving of Northwest 5th Avenue with the addition of a curb and gutter, the construction of an entrance driveway, paved and grassed parking areas, and sidewalks at the Loblolly Environmental Facility, and the widening and addition of a new turn lane and pedestrian crosswalk at the intersection of Northwest 8th Avenue and Northwest 31st Drive. The Stormwater Permit Generally The entire Phase IA project area lies within the Hogtown Creek 10-year floodplain. It also lies within the Hogtown Creek Hydrologic Basin, which basin includes approximately 21 square miles. The project area for the proposed stormwater permit is 4.42 acres. Water quality criteria Phase IA of the Greenway will not result in discharges into surface groundwater that cause or contribute to violations of state water quality standards. When a project meets the applicable design criteria under the District's stormwater rule, there is a presumption that the project will not cause a violation of state water quality standards. There are two dry retention basins associated with the project. Basin 1 is located at the cul-de-sac of Northwest 5th Avenue and will capture and retain the stormwater runoff from the new and reconstructed impervious areas at the Loblolly Facility. Basin 2 is located at the parking area and will capture and retain stormwater runoff at the existing building and proposed grass parking area. Under the stormwater rule, the presumptive criteria for retention basins require that the run-off percolate out of the basin bottom within 72 hours. The calculations performed by the City's engineer show that the two retention basins will recover within that timeframe. In making these calculations, the engineer used the appropriate percolation rate of ten inches per hour. Even using the worst case scenario with a safety factor of twenty and a percolation rate of one-half inch per hour, the two retention basins will still recover within 72 hours. The presumptive criteria for retention basins require that the basin store a volume equal to one inch of run-off over the drainage area or 1.25 inches of run-off over the impervious area plus one-half inch of run-off over the drainage area. The calculations performed by the City's engineer show that the two retention basins meet the District's volume requirements for retention systems. An applicant is not required to utilize the presumptive design criteria, but instead may use an alternative design if the applicant can show, based on calculations, tests, or other information, that the alternative design will not cause a violation of state water quality standards. As a general rule, the District applies its stormwater rule so that water quality treatment is not required for projects or portions of projects that do not increase pollutant loadings. This includes linear bicycle/pedestrian trails. The City's proposed trail will not be a source of pollutants. The City will install signs at both entrances to the trail to keep out motorized vehicles. Except for emergency and maintenance vehicles, motorized vehicles will not be permitted on the trail. The infrequent use by emergency or maintenance vehicles will not be sufficient to create water quality concerns. The construction of a treatment system to treat the stormwater from the trail would provide little benefit and would only serve to unnecessarily impact natural areas. Although treatment of the stormwater run-off from the trail portion of the project is not required under District rules, the run-off will receive treatment in the vegetated upland buffer adjacent to the trail. The District's proposed other condition number 3 will require the City to plant vegetation in unvegetated and disturbed areas in the buffer. This will reduce the likelihood of erosion or sedimentation problems in the area of the trail. Although disputed at hearing, it is found that the City's engineer used the appropriate Manning coefficient in the calculations regarding the buffer. Even without a vegetated buffer, run-off coming from the bicycle trail will not violate state water quality standards. The City will install appropriate erosion and sediment controls. These include siltation barriers along the entire length of both sides of the proposed trail prior to commencing construction. Such barriers will not allow silt or other material to flow through, over, or under them. The City will also place hay bales and any other silt fencing necessary to solve any erosion problem that may occur during construction. In addition, the permit will require an inspection and any necessary repairs to the siltation barriers at the end of each day of construction. Saturation of the limerock bed under the paved portion of the trail is not expected to cause a problem because heavy vehicles will not regularly use the trail. The trail portion of the project can be adequately maintained to avoid deterioration. Sensitive Karst Areas Basin criteria The two proposed dry retention basins for Phase 1A are located within the District's Sensitive Karst Areas Basin. They include all of the minimum design features required by the District to assure adequate treatment of the stormwater before it enters the Floridan aquifer and to preclude the formation of solution pipe sinkholes in the stormwater system. There will be a minimum of three feet of unconsolidated soil material between the surface of the limestone bedrock and the bottom and sides of the two retention basins. The appropriate mechanism for determining the depth of limestone is to do soil borings. The soil borings performed by the City show that there is at least three feet of unconsolidated material between the bottom of the basins and any limerock where the borings were taken. In other words, limestone would not be expected to be within three feet of the bottom of either basin. Based on the soil boring results, the seasonal high water table is at least six feet below ground level. The depth of the two retention basins will be less than ten feet. Indeed, the depth of the basins will be as shallow as possible and will have a horizontal bottom with no deep spots. To make the retention basins any larger would require clearing more land. A large shallow basin with a horizontal bottom results in a lower hydraulic head and therefore is less potential for a sinkhole to form. Before entering the basins, stormwater will sheet flow across pavement and into a grass swale, thereby providing some dispersion of the volume. Finally, the two retention basin side slopes will be vegetated. Special condition number 7 provides that if limestone is encountered during excavation of a basin, the City must over- excavate the basin and backfill with three feet of unconsolidated material below the bottom of the basin. Drainage and flood protection Contrary to Petitioners' assertions, the project will not adversely affect drainage or flood protection on surrounding properties. The trail will be constructed generally at existing grade. Because the trail will be constructed at existing grade, the net volume of fill necessary for Phase 1A is approximately zero. Therefore, there will not be a measurable increase in the amount of runoff leaving the site after construction, and the trail will not result in an increase in off-site discharges. District rules require that the proposed post- development peak rate of discharge from a site not exceed the pre-development peak rate of discharge for the mean annual storm only for projects that exceed fifty percent impervious surface. The proposed project has less than fifty percent impervious surface. Even though it is not required, the City has demonstrated that the post-development rate of discharge will not exceed the pre-development peak rate of discharge. Both basins will retain the entire mean annual storm so that the post-development rate of discharge is zero. Even during a 100-year storm event, the retention basins willl not discharge. Therefore, there will not be any increase in floodplain elevations during the 10, 25, or 100-year storm events from the proposed project. Operation and maintenance entity requirements The applicable requirements of Chapter 40C-42, Florida Administrative Code, regarding operation and maintenance, have been met by the applicant. The City proposes itself as the permanent operation and maintenance entity for the project. This is permissible under District regulations. The duration for the operation and maintenance phase of the permit is perpetual. The City has adequate resources and staff to maintain the phase 1A portion of the project. The public works department will maintain the stormwater management system out of the City's utility fund. The City provides periodic inspections of all of its stormwater systems. These inspections are paid for out of the collected stormwater fees. The City will also conduct periodic inspections of the project area, and the two retention basins will be easily accessed by maintenance vehicles. The City will be required to submit an as-built certification, signed and sealed by a professional engineer, once the project is constructed. Monthly inspections of the system must be conducted looking for any sinkholes or solution cavities that may be forming in the basins. If any are observed, the City is required to notify the District and repair the cavity or sinkhole. Once the system is constructed, the City will be required to submit an inspection report biannually notifying the District that the system is operating and functioning in accordance with the permitted design. If the system is not functioning properly, the applicant must remediate the system. The City will be required to maintain the two retention basins by mowing the side slopes, repairing any erosion on the side slopes, and removing sediment that accumulates in the basins. Mowing will be done at least six times per year. The City will stabilize the slopes and bottom areas of the basins to prevent erosion. The City has a regular maintenance schedule for stormwater facilities. The project will be included within the City's regular maintenance program. The City has budgeted approximately $80,000.00 for maintenance of the trail and vegetated buffer. Also, it has added new positions in its budget that will be used to maintain and manage the Greenway system. Finally, City staff will conduct daily inspections of the Phase 1A trail looking for problems with the vegetated buffer, erosion problems along the trail, and sediment and debris in the retention basin. If the inspections reveal any problems, the staff will take immediate action to correct them. The Noticed General Environmental Resource Permit Generally By this application, the City seeks to construct 481 square feet of piling supported structures over wetlands or surface waters. The proposed structures include a 265 square foot timber bridge over an un-vegetated flow channel, which connects a borrow area to Possum Creek, and a 216 square foot boardwalk over two small wetland areas located south of the flow channel. None of the pilings for the bridge or boardwalk will be in wetlands, and no construction will take place in Hogtown or Possum Creeks. The paved portion of the trail will not go through wetlands, and there will be no dredging or filling in wetlands. The receiving waters for the project are Hogtown and Possum Creeks. Both are Class III waters. Hogtown Creek originates in north central Gainesville and flows southwest to Kanapaha Lake/Haile Sink in southwest Gainesville. Possum Creek originates in northwest Gainesville and flows southeast to its confluence with Hogtown Creek south of the proposed bridge structure. Wetlands The total area of the proposed bridge and boardwalk over surface water or wetlands is approximately 481 square feet. The wetland delineation shown on the City's Exhibit 5A includes all of the areas in the project area considered to be wetlands under the state wetland delineation methodology. The United State Army Corps of Engineers' wetland line includes more wetlands than the District wetland line. The former wetland line was used to determine the area of boardwalk and bridge over wetlands. Even using this line, however, the total area of boardwalk over surface waters or wetlands is approximately 481 square feet and is therefore less than 1,000 square feet. Navigation The proposed system does not significantly impede navigation. Further, the structures will span a wetland area and an un-vegetated flow channel, both of which are non-navigable. In fact, the flow channel generally exhibits little or no flow except after periods of rainfall. Water quality The construction material that will be used for the bridge and boardwalk will not generate any pollutants. Morever, chemical cleaners will not be used on those structures. Silt fences will be used and vegetation will be planted in the vicinity of the bridge and boardwalk to prevent erosion and sedimentation problems. The amount of erosion from drip that comes off the boardwalk will be minimal. Therefore, the bridge and boardwalk will not cause a violation of state water quality standards. Off-site flooding The project will not impede conveyance of any stream, river, or other water course which would increase off-site flooding. The structures will completely span the wetland areas and flow channel, and no part of the structures, including the pilings, will lie within any water or wetland areas including the flow channel. There will be a span of 2.5 to 3 feet from the horizontal members of the bridge and boardwalk down to the ground surface which will allow water to pass through unobstructed. Further, there will not be any cross ties or horizontal obstructions on the lower portions of the boardwalk or bridge pilings. Further, due to the spacing of the pilings, the boardwalk and bridge will not trap sufficient sediment such as leaves to impede the conveyance of the flow channel. Therefore, conveyance through the flow channel will not be affected by the structures. Because the boardwalk and bridge are not over Hogtown or Possum Creeks, they will not cause any obstruction to the conveyance of the creeks. Aquatic and wetland dependent listed species The project will not adversely affect any aquatic or wetland dependent listed species. These species are defined by District rule as aquatic or wetland dependent species listed in Chapter 39-27, Florida Administrative Code, or 50 Code of Federal Regulations, Part 17. No such species are known to exist in the project area, and none are expected to exist in the location and habitat type of the project area. Therefore, contrary to Petitioners' assertions, there are no listed salamander, frog, turtle, or lizard species known to occur within the Hogtown Creek basin. Although it is possible that the box turtle may be found in the project area, it is not an aquatic or wetland dependent listed species. One baby American alligator (between two and three feet in length) was observed in the borrow pit area of the project on September 11, 1997. Except for this sighting, no other listed animal species have been observed in the project area. As to the alligator, the only area in which it could nest would be in the existing excavated borrow pit, and none of the proposed construction will take place in that area. More than likely, the alligator had walked into the area from Clear Lake, Kanapaha Prairie, or Lake Alice. The proposed structures will not affect the movement of the alligator nor its feeding habits. Drainage of wetlands Because the boardwalk and bridge are elevated structures over waters and wetlands, and the City has not proposed to construct ditches or other drainage systems, the proposed system will not cause drainage of the wetlands. Coral/macro-marine algae/grassbeds The proposed system is not located in, on, or over coral communities, macro/marine algae, or a submerged grassbed community. D. Were the Petitions Filed for an Improper Purpose? Prior to the filing of their petitions, Petitioners did not consult with experts, and they prepared no scientific investigations. Their experts were not retained until just prior to hearing. Petitioners are citizens who have genuine concerns with the project. They are mainly longtime residents of the area who fear that the Greenway will not be properly maintained by the City; it will increase flooding in the area; it will cause water quality violations; and it will attract thousands of persons who will have unimpeded access to the back yards of nearby residents. Although these concerns were either not substantiated at hearing or are irrelevant to District permitting criteria, they were nonetheless filed in good faith and not for an improper purpose.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the St. Johns River Water Management District enter a final order approving the applications of the City of Gainesville and issuing the requested permits. DONE AND ENTERED this 19th day of December, 1997, in Tallahassee, Leon County, Florida. DONALD R. ALEXANDER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 SUNCOM 278-9675 Fax Filing (904) 921-6847 Filed with the Clerk of the Division of Administrative Hearings this 19th day of December, 1997. COPIES FURNISHED: Henry Dean, Executive Director St. Johns River Water Management District Post Office Box 1429 Palatka, Florida 32178-1429 Samuel A. Mutch, Esquire 2790 Northwest 43rd Street Suite 100, Meridien Centre Gainesville, Florida 32606 Jennifer B. Springfield, Esquire Mary Jane Angelo, Esquire Post Office Box 1429 Palatka, Florida 32178-1429 Richard R. Whiddon, Jr., Esquire Post Office Box 1110 Gainesville, Florida 32602-1110
Findings Of Fact Hammock Dunes is a parcel of land located on the east coast of Florida approximately half way between Daytona Beach and St. Augustine. With the exceptions of a few small parcels separated from the main area, the area in question in this case is that bounded by Malacompra Road to the north, the Atlantic Ocean to the east, and State Road A1A to the south and west. The property is cut at several places from the west boundary, State Road A1A to the east by 16th Road, Jungle Hut Road, and the approach road to the Sheraton Hotel. All of the property at issue in this hearing is owned by either Admiral or its parent company, ITT. The natural terrain is a series of ridges and swales which contain to the west, sea oats, salt palmetto, and coastal scrub in the drier areas. The lower interior ridges contain alternating growth of the above vegetation until one gets to the immediate area of State Road A1A where, because of the fill, oak and other upland vegetation is in evidence. Ditches exist on both sides of each of the cross roads mentioned above. In addition, ditches have been dug in a generally north - south direction following the ridge and swale run of the land and there is also evidence of spoil banks in the southern portion of the property resulting from the dredging of the Florida East Coast Canal. The north/south ditches in question were dug as a part of the mosquito control program carried out over several years starting in 1953 to remove the seasonal breeding ground of salt marsh mosquitoes. In addition to these north/south control ditches, there are other ditches leading away from them which form a part of that system, and there are some permanent waters on the property, primarily at the southern end near the Sheraton Hotel and at the coquina quarry. The dominant vegetation adjacent to the ditches includes a mixture of plants including weeds, disturbance plants, and persistent vegetation. Aerial photographs taken at various times over the period of the last 40 years reflect that the vegetation includes cat tails, bunch grass, wax myrtle, cabbage palms, and salt brush. Many of these ditches are encroached by the growth surrounding them. The existence of cabbage palms serves as a tool to define the swale areas because water conditions are not suitable for these plants in the swales. The swales in question, which basically were the areas in which the drainage ditches were dug, were natural and not man made. According to Dr. Durbin C. Tabb, a consultant in environmental assessment, whose work emphasizes the location, siting, and sensitivity of aquaculture projects, vegetation in areas such as this goes through a progression of species and this progression is used in relic analysis. Dr. Tabb performed a relic analysis on the area in question and based on this, as well as an analysis and examination of extensive aerial photography done of the area, he concluded that prior to the ditching activity, the plant community in the area could be described as a "wet prairie." This is an area of virtual treeless grasses and shrubs growing in an area periodically inundated by water. The zonation of the plants caused by this periodic inundation, as determined by Dr. Tabb, is consistent with wet prairie and that condition, prior to the ditching for mosquito control purposes, was consistent with mosquito breeding. In his analysis, Dr. Tabb found that numerous plants, such as cat tails, maiden cane, pickerel weed, saw grass, spike rush, soft rush, switch grass, button bush, and coastal plain willow, all of which need a moist environment, were extant in the area. Dr. Tabb also concluded that the water in the swales was primarily fresh water. In dry periods, however, in the lower areas, some salt could be sucked up from below ground by capillary action. Another survey of the area was conducted by Jeremy Tyler, the supervisor of the dredge and fill section of the Northeast District of DER, who has performed more than 3,000 jurisdictional determinations over the past 10 years, and who performed the jurisdictional determination for the property in question here. In making his determination, Mr. Tyler looked at various maps, aerial photographs, and information supplied by Admiral Corporation and conducted at least three recent on-sight visits to the property in addition to others conducted in the past. Based on all of this information available to him, Mr. Tyler concluded that certain portions of the Hammock Dunes area were exempt from DER dredge and fill permitting requirements. His conclusions were that the canal running to the intra-coastal waterway and the waterway itself were jurisdictional. Mr. Tyler determined that at least two ditches went through the uplands portion of the area as a part of the mosquito control operation. These ditches were the one at the west side of Malacompra Road which entered into the intra-coastal waterway; another was the westernmost ditch running south into the barge canal at the southeast corner of the property. Both were exempt. The third ditch in the area, that on the most eastern side, was not cut in the mosquito control operation and therefore did not meet the criteria for exemption. On the basis of this, he concluded that DER's jurisdiction extended to the sides of the jurisdictional ditch up about half way northward on the lake in the southeast corner of the property. North of that point, the ditch was cut through a non-jurisdictional uplands area. Mr. Tyler indicated that he would normally follow each ditch up-stream, but, having been made aware of the extent of the mosquito control operation, and the relationship of that operation to the ditches, he concluded that the majority of the ditches in the area were dug during the mosquito control operation and met the criteria for exemption, and, as a result, he did not have to follow them to their source. If he had not been satisfied that the mosquito control district exemption applied, he would have gone up each and every ditch to see where jurisdiction stopped. Prior to publishing an opinion as to jurisdictional limitations, ordinarily the agency will request a legal review of the proposed determination. This was done in the instant case by agency counsel Richard Lee. However, Mr. Tyler made the ultimate determination that the exemption applied in this case. He did not examine the question of whether the ditches constituted a series of lakes connected, so as to support jurisdiction, because since he was satisfied they were dug in mosquito control operations, the exemption applied which obviated any other jurisdictional issue. Robin D. Pyne, a consulting engineer in water resources, has studied the Hammock Dunes property since 1977 when his company was hired to do a water use plan for a neighboring community. Since 1979, he has had substantial opportunity to study the water situation there. Over the years, he has specifically tried to determine if standing water existed between the swales prior to the beginning of the digging of the mosquito control ditches in 1953. In doing his analysis, he relied on historical data, site topography data collections, reports of other agencies, and the work done by other experts. Considering all this, Mr. Pyne found that the soil in the Hammock Dunes area was basically well drained beach sand. Any rainfall on this area would seep in quickly and not run off, as the sand is very porous. During periods of sustained rainfall, the water table rises into the low part of some of the swales. Once the rains stop, however, the water drains off quickly through the ditches, and before they were in place, through the underground drainage which went west to east to the ocean as well as through evaporation. Extrapolation of this theory and its application to known data revealed that prior to the beginning of the mosquito control ditch program in 1953, wet soils were found in the swale bottoms only periodically and the swale bottom water level was determined by the level of the water table in the area. Generally, the swale bottoms would not be wet under average or dry weather prior to the digging of the ditches. The several mathematical calculations made by Mr. Pyne for the period prior to the ditches revealed that generally the average water table was below the bottom of the swale and there is no standing water in the bottom of a majority of the swales. Mr. Pyne concluded that the digging of the ditches may have lowered the water table by approximately one foot overall, but this would not affect his thesis. It is accepted here over that of Mr. Frazee who testified for Petitioner, and whose testimony is discussed in Para 24, infra. Other analysis was conducted by Mr. James H. Humphrey, an aerial cartographer who analyzed photographs of the area in question taken in 1943, 1952 and 1983. The use of a stereo plotter in these analyses delineated swales, ditches, roadways and other features important to the project. Based on the technical tools and procedures available to and used by him in his analysis, Mr. Humphrey is convinced the swales he identified are accurate and using his plotter, the textures of grasses, the tones of grey on the picture, and other like considerations, he was able to determine this outline. Dr. Thomas H. Patton, a geologist with a specialty in geomorphlogy, a study of why land looks as it does, and the relationship of soils to geomorphology, performed studies on the property in question to determine if the swales contained soils indicative of inundated conditions. To determine this, he looked for certain characteristics of the soils in the area to determine if the soils had been inundated for a period of time. In doing so, he first used aerial photographs to get the lay of the land from an overview standpoint defining general trends and the general outline of the land, roads, and other impacts by man. He then took soil samples from the major, the intermediate, and the minor swales and tried to get samples from between the swales to see if there was any interconnection between them. He took samples from soil across the entire width of each swale studied. Soil samples contain and maintain within themselves indications of sustained emergence or saturation. Studying these indicia can show how long the soil was dry (above the water table or below it). If the soils were inundated for a long period, they would show a preservation of a surface decomposed organic layer reflected by a dark grey to black color. This is the primary indication. There are others such as a blue-grey/green coloring of the subsurface and a mottling or sign of reduced condition. This test has been adopted by the Department of Natural Resources and the United States Corps of Engineers. Certain horizons have been defined and identified by letter. These are: O - the top, made up of leaf litter A - the elevated layer - transfer level B - just at or above the water table (normal dark brown color), and BH - the water table level - no clay or organics According to Dr. Patton, it takes a long time for the BH level to accumulate. The process is quicker in a porous soil than a dry soil and the Hammock Dunes area has porous soil. One would not find a BH horizon, however, in a saturated or inundated soil. If the soil is saturated, even a large part of the year, there would be no BH horizon. At the Hammock Dunes site, the emergent soil has a diffused, darker upper surface. Below that comes a much cleaner, greyer sand and beneath that, the zone of accumulation. Dr. Patton's survey revealed to him that soils in the swales were not inundated throughout the year. They were inundated during periods of high rainfall, but because of the porosity of the soil, would drain quickly. On the entire property, he saw only four isolated areas that could be considered wetlands. In the majority of the area, the soils appeared to be emergent soils. Most met the typical horizon picture including a BH zone. Using a specific site as an example, Dr. Patton traced to the BH horizon starting at approximately 42 inches down. The soil started lighter on top and proceeded to get darker as one went down to the zone of accumulation. That indicated that the water table was at or near 42 inches sufficiently during the year to achieve accumulation. Had the water table been nearer the surface more of the year, that would not occur. In Dr. Patton's opinion, this situation, including the water table level, stayed just about at that point all the time for at least a couple of hundred years if not for 1,000 years. This is not to say that the water table will not move during periods of drought and over rain. It will, but those periods are relatively short and the general level of water table where the BH horizon is is just about normally at 42 inches throughout the Hammock Dunes property. In preparing his analysis, Dr. Patton compared the swales work described above with the soils found in what he considered a wetlands area just north of 16th Road to see what a real wetlands soil in this area looked like. He found the latter to be black and mucky and typically wetland. He also took samples from Bonne Terre farms, which is a drained historical wetland. In this wetland, the soil was quite organic at the surface which showed sustained inundation of the surface. He also took samples at a place where Varn Lake comes close to State Road A1A and at that point, it was determined that there had been submergence, saturation, or inundation long enough to constitute a wetlands. The organic material was at a depth which indicated there that originally the area was wetlands but he cannot say when. In general, then, if the interdunal swales had been inundated prior to the dredging operation of the mosquito control ditches, there would have been organic materials still in the bottom of these swales. The time necessary to leach it out would have been several hundred years. Since the BH horizon, with its level of organic material, was located at 42 inches, this indicated that, for the most part, the Hammock Dunes areas with their swales included were not historic wetlands. Dr. Patton agreed with Mr. Pyne that the digging of the mosquito control ditches did not materially lower the water table nor does he believe that except in the worse conditions, in the rainiest of rainy seasons, that the water table in one swale was ever connected to the water table in another. In contrast to the above, Petitioner introduced testimony by various experts and residents which contradicted that referenced above. James M. Frazee, an employee of the St. Johns River Water Management District became familiar with the Hammock Dunes area in connection with a salt water intrusion problem he was working on while employed with the U.S. Geological Survey in 1978 to 1980. During that period, he entered the site at least once a month. Based on his visits at the time, he found the area in question to be a combination of relic dunes with an interdunal lake system which holds water during periods of average to high water levels. His measurements of the water depth between the ridges showed it to be anywhere from 1 1/2 to 2 1/2 feet down. This was during a period when the water table was between 5 1/2 to 6 feet above mean sea level, and was a period of above normal rainfall. During the period 1965 to 1980 there was a period of less than normal rainfall during which the water table fell from the high above to approximately 6 inches above mean sea level. Mr. Frazee contends that the interdunal swales are lakes and ditches dug by the mosquito control district have drained the area. In his opinion, were it not for these ditches, the ground in the swales would be much wetter, but Mr. Frazee cannot indicate by how much. His testimony, contradicted by that of Dr. Patton and Mr. Pyne, is not considered to be consistent with the weight of the evidence. John Labie, an employee of DER specializing in water quality assurance, is familiar with the Hammock Dunes area and examined it as to ditching by a review of numerous aerial photographs and surveys. In his study, he tried to determine what the area looked like originally. In addition to the documentation he reviewed, he also walked a great portion of the area, personally examining the property in question. On the basis of his inquiry, he concluded that the area was previously a wetlands which was dried out by the mosquito control ditches. He admits that his depictions of historical wetlands, on the maps utilized for demonstrative purposes at the hearing, was not based on the same degree of accuracy and sophistication as was the basis for Respondent, Admiral's expert testimony. Another evaluation was conducted by botanist Sydney T. Brinson, an employee of DER, whose job includes the preparation of jurisdictional determinations based on botanical studies. She visited the site herself and determined there are at least three connections to waters of the state and from these connections into the interior of the Hammock Dunes property. She contends then, that if there were not mosquito control exemption, at least some of the ditches would, at least partway up, be jurisdictional. It is her opinion that before the ditches were put in, based on old documentation, the area was a series of coastal dunal lakes and the lakes, as they existed, did not have much plantlife in them. Relying on the U.S. Coastal and Geodetic Survey maps, which refer to much of the areas as "open water," she contends that the area was a system of coastal lakes rather than marshes. Marshes contain vegetation. Lakes generally do not. It is her further opinion that the interdunal waters, as interdunal lakes, total approximately 270 acres. Not all of these are connected at the surface. She feels that all of the individual systems north of the Florida East Coast Canal are more than 10 acres in area and would have to be over 2 inches in depth because of the fact that they are reflected as open water on the USGS maps. Based on her research, she concluded that prior to the digging of the mosquito control ditches, the area was a historic wetland. This opinion is not supported by the weight of the evidence, however. Another expert in soils science, Dar Guam Cheng, visited the site on May 9, 1985, and, in addition, reviewed a 1918 soils map of the area. Back then the area consisted of hydric soils which is a wetlands soils. All types of soils found in the area in 1918 are considered hydric (wetlands) soils. Mr. Cheng, however, took no samples himself on the Hammock Dunes property. His evaluation was based solely on the 1918 map, and is not considered to be of substantial value to the determination of this issue. Burrell Miller, a 76 year old resident of Hammock Dunes since 1979, but who either lived or visited in the area since 1917, indicated that his family homesteaded the area around Malacompra Road in 1920. During the period 1917 through 1943, he recalled, there was always water storage in the Hammock Dunes area. There was, however, not always high water except in the 1926 hurricane. There is, however, fresh water generally there every time it rains and the water generally stays level with the sea level. Mr. Miller recalls that from time to time in years past, boats were needed to cross the savannah to the beach. On other occasions one could wade in water up to one's waist. As he recalls, some of the soil was wet all of the time and never dried out. Mr. Miller's testimony, however, was fragmented and capable of numerous interpretations. It is not given the same weight as the scientific evidence presented by other parties. Nonetheless, another resident, Petitioner, Gerald Schatz, started coming to the area in 1953 and settled there in 1954. Over the years, he has gone into the Hammock Dunes area quite frequently and it is his recollection that along Malacompra Road, there always seemed to be some water, at times, up to the floor board of his pickup truck. He can recall when the mosquito control ditches were started in 1953. Even before he came to the area, Mr. Schatz' father-in- law lived there and always considered it wet. He recalls hearing others also describing the area as being wetlands. During the 1926 hurricane, it was flooded and again in 1957. Before the ditches were installed, there was, to his recollection, substantial standing water. Mr. James J. Miller, state archaeologist for Florida and very familiar with the history of the area, is familiar with the Hammock Dunes area from the work he did on a Development of Regional Impact for the area. Having reviewed records and historical documents relating to this specific area, going back as far as 1605, he concluded that there was no natural waterway extending across the Hammock Dunes area. His study, however, dealt with the issues of navigability of waters not its hydrographics and his study did not deal with the issue of wetlands. Nonetheless, it is clear from the above, that the area was neither open water or a water course at any time in recorded history. The overwhelming weight of the evidence clearly indicated that the Hammock Dunes property was not a historical wetlands within the framework and the intent of the statute or the rule. Admittedly, the area was inundated from time to time, especially after such periods of high rainfall as hurricanes, tropical storms, or above average rainy seasons. During those periods, the standing water which remained for a relatively short period of time was often of such magnitude as to come to the floor board of a pickup truck, or require the use of a skiff or other surface transport over the water to cross it. This clearly accounts for the memory of Mr. Miller as to him using boats to get to the beach and for the recollection of Mr. Schatz who remembered water coming to the floor boards of his truck On the whole, however the scientific evidence presented by Admiral Corporation, including such expert testimony as that of Dr. Patton, Dr. Tabb, Mr. Pyne, and other highly qualified scientists who visited the site and conducted reliable scientific evaluations of the area, all clearly lead to the inescapable conclusion that the area was for the most part and over the long run not a submerged wetland. There can be little question that the majority of the "swales" on Hammock Dunes were either the result of or enhanced by mosquito control ditching operations of the East Flagler Mosquito Control District over the period from 1953 through completion. Though these ditches ultimately connect with the intercoastal waterway or the Florida East Coast Canal, both of which are waters of the state, these connections, with the exception of the ditch west of Varn Lake which is admittedly not exempt, are obviously due to mosquito control activities of EFMCD. According to the best evidence available, the land in question was not a surface water body nor was it connected to a water of the state prior to the construction of the mosquito control ditch system. For the most part, the interdunal swales, which constantly hold water, are less than 10 acres in size and have an average depth of less than 2 feet of water in them throughout the year.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is, therefore, RECOMMENDED that DER take final agency action adopting the preliminary determinations made by its Northeastern District of DER's permitting jurisdiction for the discharge of dredge and fill materials on Hammock Dunes as outlined in the DER Northeast District letter of August 9, 1984 to Admiral Corporation. RECOMMENDED in Tallahassee, Florida this 23rd day of December, 1985. ARNOLD H. POLLOCK Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 23rd day of December, 1985. APPENDIX TO RECOMMENDED ORDER, CASE NO. 84-3604 In the preparation of this Recommended order, the proposed Findings of Fact submitted by Petitioner and Respondent were thoroughly considered and evaluated. As listed below, the individual proposed findings were accepted or rejected by the undersigned as indicated: For the Petitioner: 1) accepted and incorporated in para 30 (a)-(e) accepted but not dispositive of any issue - 6) accepted except for the last sentence of para 6 which is argument rejected as contra the weight of the evidence accepted accepted but immaterial 10 - 12) accepted but not dispositive irrelevant irrelevant irrelevant accepted rejected as irrelevant (a) - (d) accepted - 23) accepted but not controlling 24 - 25) rejected as argument, finding of fact 26 (a) (1) - (4) accepted but not conclusive or definitive 26 (5) rejected as a summary of documentation and not a mapped Findings of Fact 26 (b) - (d) rejected as a summary of testimony and not a finding of fact rejected as a summary of testimony and not a finding of fact rejected 29 (a) - (d) rejected as argument summarization of testimony rather than Findings of Fact rejected as a summary of testimony rather than Finding of Fact accepted 32 - 36) accepted rejected as contra to the weight of the evidence rejected as summary of testimony and not Finding of Fact rejected as contra to the weight of the evidence and argument rather than Finding of Fact rejected as summary of testimony and not Finding of Fact 1st and 2nd paras accepted, but 3rd paragraph rejected as not the better evidence rejected as argument and not Finding of Fact 43 - 44) accepted accepted rejected as contra to the weight of the evidence accepted as to the severance of Varn Lake from the major canal but rejected as to contra to the weight of the evidence as to the historical connection rejected as contra to the weight of the evidence accepted accepted that Mr. Labie made such a "finding" but the finding is rejected as contra to the weight of the evidence 51 - 52) rejected as recitations of testimony and not Findings of Fact 53) rejected as far as categorization of the periodic wet areas as "lake systems" 54) accepted as a statement of Mr. Schatz's recollection accepted as a statement of the contents of a writing not dispositive of the issue 57 - 59) accepted 60) rejected as contra to the weight of the evidence For the Respondent: accepted accepted accepted except for the term "swales" which is used merely descriptively and not binding as to definition accepted accepted 5 (a) - (c) rejected as recitations of testimony rather than Findings of Fact 5 (d) - (8) accepted rejected as contra to the weight of the evidence. Petitioner's witnesses' testimony was, in general, in disagreement with that of Respondent's witnesses. However, as stated in the Recommended Order, the weight and quality of Respondent's evidence prevailed. (o) - (q) accepted not as fact but as a recitation of the evidence presented by each witness (a) - (c) accepted - 11) accepted 12) accepted COPIES FURNISHED: Victoria Tschinkel Secretary Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32301 Deborah Getzoff, Esquire Ross Burnaman, Esquire Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32301 Randall E. Denker, Esquire Lehrman & Denker Law Offices 103 North Gadsden Street Post Office Box 1736 Tallahassee, Florida 32302 Timothy Keyser, Esquire Post Office Box 92 Interlachen, Florida 32048 Carlos Alvarez, Esquire Carolyn S. Raepple, Esquire Hopping Boyd Green & Sams 420 First Florida Bank Bldg. Post Office Box 6526 Tallahassee, Florida 32314 =================================================================
Findings Of Fact Respondent is and at all material times has been a certified pest control operator in the category of fumigation. He works for Thumb Pest Control, Inc. He was the supervisor present when the company performed the tent fumigation of a residential structure located at 11 West Muriel Street, Orlando, Florida, on May 29, 1987. On May 28, 1987, Respondent gave Petitioner and the Orlando Fire Department written notice of the details of the job, including his night telephone number. The night number was for Respondent's home telephone. Respondent lived in Tampa. His telephone number was in the "813" area code, not the "305" area code of Orlando. The notice did not disclose Respondent's area code. However, the form bore the address of Thumb Pest Control, Inc., which was in Tampa. It was Respondent's understanding-- uncontradicted by Petitioner-- that he was required by law to give this notice only to Respondent; he gave the notice to the Orlando Fire Department as an added precaution. Respondent and Tim Lightner, a certified operator and the Orlando branch manager of Thumb Pest Control Inc., testified that the tent did not have tears when they released the fumigant at around 3:00 p.m. on May 29, 1987. Their testimony is credible and unrebutted. The fumigant that they used was methyl bromide. The fumigant also included chloropicrin, which is a warning odorant accompanying the odorless methyl bromide. The commercial formulation of the fumigant in this case was Brom-O-Gas. This is a highly toxic gas which causes nausea, convulsions, and death to humans exposed to it. The manufacturer states in a booklet accompanying Brom-O-Gas that "two persons trained in the use of this product must be present at all times when worker exposure exceeds 5 PPM. . . ." Petitioner's Exhibit Number 4, page 1. In another document, entitled "Structural Fumigant: A guide for fumigating effectively with Bromo-O-Gas," the manufacturer emphasizes, as the title suggests, methods designed to increase the killing efficiency of the pesticide. The manufacturer suggests frequent monitoring during fumigation when persons are occupying an adjacent building sharing a common wall with the building being fumigated. Petitioner's Exhibit Number 5, page 2. By negative implication, the manufacturer does not suggest monitoring when persons occupy buildings that are nearby but not sharing a common wall. At around 8:30 p.m., the Orlando Fire Department received a telephone call from a neighbor living nearby the tented house. She reported that fumigant was escaping from the tent. Members of the Orlando Fire Department responded to the call and found that the tent had approximately ten tears in it with some as much as one foot long. It took six firemen about two hours to repair the tears with duct tape. Prior to making the repairs, the firemen contacted their dispatcher and directed him to try to reach a representative of Thumb Pest Control, Inc. There was no admissible evidence concerning precisely how the dispatcher or dispatchers, who did not testify, tried to reach Respondent or other representatives of Thumb Pest Control, Inc. In any event, the Orlando Fire Department was unable to reach anyone with Thumb Pest Control, Inc. that evening. Respondent testified that he, his wife, and one-year old child were home all evening on May 29, 1987, and that he received no calls. He also testified that he uses a telephone answering machine when away from home and, even though he was home all night, he had no messages from that evening. There does appear to have been some confusion concerning area codes. There also was no positive testimony that anyone tried to telephone the night number of Respondent, as shown on the fumigation notice that he had delivered the prior day, together with the "813" area code.
The Issue The issue for determination is whether Petitioner is liable for the costs and expenses incurred by Respondent in responding to a pollutant discharge, occurring on November 6, 1992, at the waters off John Lloyd State Park, Dania, Florida, and for damages to natural resources resulting from the pollutant discharge.
Findings Of Fact On November 6, 1992, a DC-7 airplane crashed off the Atlantic Coast of Florida, more particularly, 100 yards from John Lloyd State Park, and one quarter of a mile north of Dania Pier in Dania, Florida. The DC-7 was a chartered cargo airplane and had departed from Miami International Airport. The DC-7 was chartered from Claudio Castillo by Miguel Delpino, United States General Manager of Aerochago Airlines, to carry cargo for Aerochago Airlines. Even though Aerochago Airlines owned aircraft, its aircraft was unavailable due to maintenance work being performed. During the flight from Miami International Airport, the DC-7 developed engine trouble, i.e., two of its engines failed. The aircraft began to lose altitude. In an attempt to regain altitude, the captain of the aircraft dumped 3,000 gallons of aviation fuel. However, the DC-7 failed to regain altitude and crashed. Remaining on the crashed aircraft were 3,000 gallons of aviation fuel and 150 gallons of motor oil. When the DC-7 crashed, only the crew and two passengers were on board. One of the passengers was Mr. Castillo. On the same day of the crash, the Florida Marine Patrol (FMP) of the Department of Natural Resources, now the Department of Environmental Protection (DEP), arrived at the crash scene at 3:20 a.m. and investigated the crash. The DEP had four employees investigating the crash: three FMP officers and one employee from the Office of Coastal Protection. The remaining aviation fuel and motor oil in the crashed DC-7 was discharging into the coastal waters. The DEP employees attempted to abate the discharge. The equipment necessary for the employees' investigation of the crash and abatement of the discharge and the cost for the equipment were the following: (a) a DEP vehicle at a cost of $7.00; (b) a twin engine vessel at a cost of $120.00; (c) an underwater sealant kit at a cost of $16.66; (d) scuba tanks at a cost of $9.00; and (e) photographs at a cost of $24.00. The total hours expended by DEP's four employees were 36 hours, at a cost of $685.84. Due to the DC-7 leaking aviation fuel and motor oil into Florida's coastal waters, removal of the aircraft from the Atlantic Ocean was necessary. DEP contracted with Resolve Towing and Salvage (RTS) to remove the DC-7. RTS is a discharge cleanup organization approved by DEP. RTS' contractual responsibilities included removal of the entire DC-7 aircraft and all debris within 100 yards of the center of the aircraft; disposal of the aircraft; plugging the engines to help stop the leakage; and removal and delivery of the engines which failed to the National Transportation Safety Board (NTSB) and the Federal Aviation Authority (FAA). Because the submerged DC-7 was located in an environmentally sensitive coral and sea-plant area, RTS was required to use extreme care in removing the aircraft. The contractual cost was fixed at $34,000.00 A DEP employee, Kent Reetz, was at the scene of the crash during RTS' cleanup. His responsibility was to monitor the removal of the DC-7 by RTS and to ensure that the aircraft's removal was in compliance with DEP's standards. During the removal of the DC-7 from the water, the fuselage ruptured, scattering debris which was dangerous to the public and to the coral and sea-plants. DEP determined that RTS was not responsible for the fuselage rupturing, but that the rupture was caused by several storms, prior to the aircraft's removal, and by the aircraft being submerged for an extended period in salt water. DEP contracted with RTS to remove the dangerous debris emitted when the fuselage ruptured. The contractual cost was fixed at $9,050.00 The total contractual cost between DEP and RTS was $43,050.00. DEP paid RTS from the Coastal Protection Trust Fund. In responding to the pollutant discharge, DEP incurred a total cost of $43,912.50. DEP assessed damages to the natural resources based upon the amount of pollutants discharged which were 3,000 gallons of aviation fuel and 150 gallons of motor oil. Using the statutory formula, DEP assessed damages to the natural resources in the amount of $57,898.72. Based upon the costs incurred by DEP in responding to the pollutant discharge in the amount of $43,912.50 and the damages to the natural resources in the amount of $57,898.72, DEP sought reimbursement and compensation from Mr. Castillo in the total amount of $101,811.22. DEP invoiced Mr. Castillo for reimbursement of the costs and for compensation for the damages. DEP provided Mr. Castillo with detailed and itemized expense documents for the costs that it had incurred in responding to the pollutant discharge. The documents showed the expenses incurred, what each expense represented, and the formula for computing each expense. Further, DEP provided Mr. Castillo with a document showing the amount of the damages to the natural resources, the formula for computing the damages, and how the damages were computed. The charter of November 6, 1992, was not the first time that Mr. Delpino had chartered the same DC-7 from Mr. Castillo. Prior to and, again, at the previous charter, Mr. Castillo represented to Mr. Delpino that he, Mr. Castillo, was the owner of the DC-7. The owner of a chartered aircraft is responsible for obtaining the aircraft's crew and insurance and for maintaining the aircraft. For the previous charter, Mr. Castillo was responsible for obtaining the DC-7's crew and the insurance and for maintaining the aircraft. Mr. Delpino had no reason to expect the charter for November 6, 1992, to be any different. Furthermore, Mr. Castillo did not inform Mr. Delpino that the responsibilities would be different. For the present charter, as before, Mr. Castillo handled all matters relating to the crew, insurance, and maintenance. Regarding the insurance, Mr. Castillo presented to Mr. Delpino an insurance certificate which, after the crash, was discovered to be false. Also, regarding maintenance, prior to the crash, the two engines which failed were to be removed and repaired, but, although they were removed, they were returned without being repaired. Mr. Castillo was the owner of the DC-7. Also, the crash of the DC-7 was investigated by several federal governmental agencies, including the FAA, the U.S. Coast Guard, and the NTSB. Both the Coast Guard and the NTSB issued reports on the crash, which identified Mr. Castillo as the owner of the DC-7. Mr. Castillo was responsible for the discharge of the 3,000 gallons of aviation fuel and 150 gallons of motor oil from the DC-7 into Florida's coastal waters.
Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Environmental Protection (DEP) enter a final order assessing Claudio Castillo $43,912.50 for costs related to DEP responding to the pollutant discharge on November 6, 1992, at Florida's coastal waters off John Lloyd State Park, Dania, Florida, and $57,898.72 for damages to natural resources resulting from the pollutant discharge--all totaling $101,811.22. DONE AND ENTERED this 26th day of August, 1997, in Tallahassee, Leon County, Florida. ERROL H. POWELL Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (904) 488-9675 SUNCOM 278-9675 Fax Filing (904) 921-6847 Filed with the Clerk of the Division of Administrative Hearings this 26th day of August, 1997.
The Issue The issues in this case are whether Respondent violated Subsections 482.121(1)(a) and 482.121(1)(b), Florida Statutes (2007),1 and, if so, what discipline should be imposed.
Findings Of Fact PFSG, Inc., d/b/a US Lawns of Destin (US Lawns),2 submitted a Pest Control Business License Application to the Petitioner, listing Mr. Lewis as its certified operator in charge for lawn and ornamental pest control, effective August 9, 2007. Mr. Lewis’ certificate number is Jf 13685. US Lawns had been operating on an emergency certificate from June 6, 2007, until Mr. Lewis’ employment on August 8, 2007. In its application for a business license, US Lawns requested that its emergency certificate be canceled as of August 8, 2007. In order for a pest control company to operate, the company has to have a certified pest control operator in charge of the pest control activities at the licensed business location. If a company does not have a certified operator to serve as the certified operator in charge, an emergency certificate can be issued and renewed monthly up to a year, allowing an employee who did not have a certified operator’s certificate to serve as the certified operator in charge. As the certified operator in charge for US Lawns, Mr. Lewis applied to Petitioner for a pest control employee identification card, effective August 9, 2007. He listed the commencement of his employment with US Lawns as August 9, 2007. He also stated that his last employment with a pest control company had ended on June 11, 2007. A pest control employee identification card was issued to Mr. Lewis by Petitioner. Mr. Lewis’ wife died on July 4, 2007. Petitioner received a complaint that Mr. Lewis was not working full time for US Lawns and was allowing US Lawns to use his certificate to maintain its business license. Based on the complaint, Michael Walters, who is employed by Petitioner as an environmental specialist II, began an investigation. Mr. Walters went to US Lawns' office and made an inspection. On October 31, 2007, Mr. Walters went to see Mr. Lewis at Mr. Lewis’ home for the purpose of interviewing Mr. Lewis. Mr. Lewis gave Mr. Walters a signed affidavit, which stated: I work full time with U.S. Lawns of Santa Rosa Beach. I have been part time since the loss of my wife, but I do go to work at least once a week and check on things. I do all the training for card holders and such. As soon as I feel better I should be back fulltime. I have been there around 5 yrs., minus one year with another company. In his request for an administrative hearing, Mr. Lewis stated: “I was on vacation for 4 weeks, due to the death of my wife,” and I was not working part time ever. The evidence is clear that Mr. Lewis was not working full time for US Lawns from the time of his wife’s death until at least the date of his affidavit, October 31, 2007.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that a final order be entered finding that Mr. Lewis violated Subsection 482.121(1)(a) and 482.121(1)(b), Florida Statutes, and revoking his certified operator’s certificate. DONE AND ENTERED this 19th day of August, 2008, in Tallahassee, Leon County, Florida. S SUSAN B. HARRELL Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 19th day of August, 2008.
The Issue Whether the South Florida Water Management District’s (“District”) intended award of a contract for aerial spraying services, granular application services, and aerial transport services, to Coastal Air Services, Inc. (“Coastal”), is contrary to the District’s governing statutes, rules, policies, or the bid specifications; and, if so, whether the decision was clearly erroneous, contrary to competition, arbitrary, or capricious.
Findings Of Fact The Parties The District is an independent taxing authority created pursuant to section 373.069, Florida Statutes, with the authority to contract with private entities to maintain real property controlled by the District. See § 373.1401, Fla. Stat. HAI is a Florida corporation duly authorized to do business in the State of Florida with a business address of 1090 Airglades Boulevard in Clewiston, Florida. Coastal is a Florida corporation duly authorized to do business in the State of Florida with a business address of 7424 Coastal Drive in Panama City, Florida. The RFB On February 7, 2018, the District issued the RFB, soliciting bids for qualified respondents to provide the following: [F]urnish all labor, equipment, perform data entry and perform all operations for spraying of aquatic, ditchbank and invasive vegetation by helicopter and provide aerial flight services for site inspection and plant surveys. Both HAI and Coastal submitted timely bids, which the District deemed responsive and responsible under the terms of the RFB. The District deemed Coastal the lowest responsive and responsible bidder for aerial spraying, granular application, and aerial transport services. The District deemed HAI the lowest responsive and responsible bidder for spot spraying services. On May 11, 2018, the District posted its Notice of Intent to Award the respective contracts to Coastal and HAI. HAI challenges the award to Coastal because it is not a responsible bidder under the terms of the RFB. HAI’s challenge focuses on two items required to document the bidder’s responsibility to perform the requested services. First, the RFB requires the bidder to provide at least two helicopters certified pursuant to 14 CFR Part 133, Rotocraft External-Load Operations; and 14 CFR Part 137, Agricultural Aircraft Operations (Part 137 Certificate). Second, the RFB requires the bidder to demonstrate its ability to obtain required insurance coverage. Part 137 Certificate HAI contends that Coastal’s bid does not meet the responsibility provisions of the RFB because it did not include sufficient Part 137 Certificates for its subcontractor, HMC Helicopters (“HMC”). HAI contends the Part 137 Certificates are required to expressly state that aircraft are certified to dispense economic poisons. Petitioner’s argument fails for three reasons. First, the RFB does not require the bidder’s Part 137 Certificate to expressly endorse aircraft to dispense economic poisons.3/ Second, assuming the express endorsement was required, the requirement does not apply to HMC. The RFB defines the term “Bidder” and “Respondent” as “[a]ll contractors, consultants, organizations, firms or other entities submitting a Response to this RFB as a prime contractor.” (emphasis added). In its bid, Coastal is listed as the prime contractor, and HMC as a subcontractor. The RFB requires each Respondent to list at least two aircraft which are Part 133 and 137 certified. The requirement applies to Coastal as the primary contractor, not to its subcontractor. Coastal’s bid listed five aircraft with both Part 133 and 137 Certificates, actually exceeding the requirement for two such certified aircraft. Third, assuming an express endorsement for dispensing economic poisons was required, and that the requirement applied to HMC, HMC’s Part 137 Certificate documents HMC’s authority to dispense economic poisons. Pursuant to 14 CFR 137.3, “Agricultural aircraft operation” is defined as follows: [T]he operation of an aircraft for the purpose of (1) dispensing any economic poison, (2) dispensing any other substance intended for plant nourishment, soil treatment, propagation of plant life, or pest control, or (3) engaging in dispending activities directly affecting agriculture, horticulture, or forest preservation, but not including the dispensing of live insects. To obtain a Part 137 Certificate, the operator must pass a knowledge and skills test, which includes the safe handling of economic poisons and disposal of used containers for those poisons; the general effects of those poisons on plants, animals, and persons and precautions to be observed in using those poisons; as well as the primary symptoms of poisoning in persons, appropriate emergency measures in the case of poisoning, and the location of poison control centers. See 14 CFR § 137.19. However, if the operator applies for a Part 137 Certificate which prohibits dispensing of economic poisons, the applicant is not required to demonstrate the knowledge and skills listed above. See Id. HMCs’ certificates do not contain an express prohibition against dispensing economic poisons. The authorization for HMC’s aircraft to dispense economic poisons is inherent in its Part 137 Certificate. Coastal’s bid meets the solicitation requirement for at least two aircraft with Part 137 Certificates. Insurance Requirements The RFB requires each Respondent to “provide evidence of the ability to obtain appropriate insurance coverage.” Respondents may meet the insurability requirement by having their insurance agent either (1) complete and sign an insurance certificate which meets all of the requirements of Exhibit H to the RFB; or (2) issue a letter on the insurance agency’s letterhead stating that the Respondent qualifies for the required insurance coverage levels and that an insurance certificate meeting the District’s requirements will be submitted prior to the execution of the contract. In response to this requirement, Coastal submitted a letter from Sterlingrisk Aviation, dated March 6, 2018, stating, “All required coverage amounts are available to Coastal Air Service, Inc. to fulfill the requirements of this contract.” In the Re: line, the letter refers to the specific RFB at issue in this case. Coastal also submitted a certificate of insurance from Sterlingrisk Aviation demonstrating the levels of insurance coverage in effect at the time the bid was submitted, although the coverages are less than the amounts required under the RFB.4/ HAI takes issue with Coastal’s evidence of ability to obtain the required coverage because the letter from Sterlingrisk does not state “an insurance certificate reflecting the required coverage will be provided prior to the contract execution.” Based on the totality of the evidence, the undersigned infers that Sterlingrisk’s letter omits the language that a certificate “will be provided” prior to contract execution, because Sterlingrisk will issue an insurance certificate only when Coastal applies, and pays the premium, for the increased coverage limitations. The letter from Sterlingrisk substantially complies with the insurance requirements of the RFB, and constitutes competent, substantial evidence of Coastal’s ability to obtain the required insurance coverage. HAI introduced no evidence that Coastal obtained an economic advantage over HAI by failing to include language from its insurance agent that “an insurance certificate reflecting the required coverage will be provided prior to the contract execution.” Instead, HAI argued that by failing to enforce that provision of the RFB, the District cannot ensure the winning bidder will be responsible to undertake the contract. HAI argued that the District’s failure to adhere to this RFB requirement may create inefficiencies that “would result in the event that Coastal were unable to obtain the required insurance coverage” before execution of the contract. Coastal’s bid documents its eligibility for insurance coverage in the amounts required by the RFB. If Coastal does not provide said certificates, it will not be qualified for final execution or issuance of the contract.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Southwest Florida Water Management District enter a final order dismissing Helicopter Applicator, Inc.’s Petition. DONE AND ENTERED this 15th day of November, 2018, in Tallahassee, Leon County, Florida. S SUZANNE VAN WYK Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 15th day of November, 2018.
Findings Of Fact Urbanek owns land in and adjacent to Town Lots 93 and 94, Highland Beach, in Section 28, Township 46 South, Range 43 East, Palm Beach County, Florida. The real estate in question is located on the eastern shore of the Intra-Coastal Waterway approximately 2,000 feet south of the mouth of the C-15 Canal. Urbanek seeks a permit under Chapters 403 and 253, Florida Statutes, and water quality certification under Public Law 92-500, to dredge approximately 24,500 square feet of shoreline and shallow nearshore area, while installing approximately 240 linear feet of bulkhead and ten mooring piles, and constructing a marginal dock and piers for the use of future residents. The application also includes filling approximately 60,000 square feet of tidally connected ditches and wetlands to allow the construction of a high density residential development. On January 19, 1976, DER received a short form application for a permit from Urbanek pursuant to Subsection 17-4.28 (4)(a), Florida Administrative Code. On March 10, 1976, Urbanek received from DER a request for additional information. This occurred 51 days after Urbanek's original application for permit. Urbanek forwarded the requested additional information to DER on April 22, 1976, and April 30, 1976. On May 12, 1976, DER notified Urbanek that the project must be submitted using standard permitting procedures along with the incorporation of certain recommendations made by DER's field inspector. On June 9, 1976, Urbanek was notified by DER that his application had been forwarded to Tallahassee with a recommendation for denial on two grounds. First, that the application did not meet the criteria for short form applications and second, that the proposed project would eliminate valuable submerged and wetland habitats. On July 27, 1976, Urbanek was notified by DER's Tallahassee office that his application was received on January 1976, and that the application was incomplete. The notification requested additional information. On September 22, 1976, DER notified Urbanek that processing of his application was discontinued because required data was not sent by Urbanek to DER. Urbanek was further advised that processing of the application," would be continued upon receipt of the necessary information. On January 20, 1977, Urbanek submitted another modified permit application to DER. On February 28, 1977, DER sent Urbanek notice of receipt of the application once again requesting additional information be submitted. On March 4, 1977, Urbanek forwarded the requested information to DER. On April 1, -1977, DER forwarded to Urbanek its notice of intent to deny and the proposed order of denial of the permit application. On April 15, 1977, Urbanek petitioned DER for a hearing pursuant to the provisions of Section 120.57, Florida Statutes. The area of the project, prior to the turn of the century, was a fresh water wetland. However, salt water intrusion from the permanent opening of the Boca Inlet in south Palm Beach County in the early 1900's paved the way for colonization of mangroves in the Spanish River Basin, now the Intra-Coastal Waterway. As the human population increased in Palm Beach County, the mangroves were destroyed in order to afford living spaces. As a result, approximately 77 percent of the mangroves in Palm Beach County have been removed. One of the last remaining mangrove areas in southern Palm Beach County is located on a strip of land which borders the eastern side of the Intra-Coastal Waterway. The applicant's project site represents a portion of that strip. The project site fronts 230 feet-of the Intra-Coastal Waterway and extends approximately 670 feet eastward to State Road A1A. The property is intersected by three mosquito control ditches which run perpendicular to the Intra-Coastal Waterway but do not connect with it, and by six lateral ditches which extend from north to south and adjoin the property to the south. The project site is thus divided into eighteen parcels of land or "islands" and a fringing shoreline area. A survey conducted on October 13, 1977, and October 18, 1977, revealed the emergent areas between the ditches to be vegetated by mostly white mangroves, with canopies ranging from fifteen to forty-five feet in height. Numerous white and red mangrove seedlings plus a few scattered black mangrove seedlings indicate that the area may be changing from a predominantly white mangrove to a mixed mangrove community throughout the project site. Batis and Sesuvium were found and Australian Pines and Brazilian Pepper were observed only in areas where spoil from dredging activities was placed on the emergent area. There are approximately seven to eight thousand trees, including seedlings, in the project area. The mangrove system at the project site was characterized as a very productive system by Dr. G. Alex Marsh, an expert in Estuarine Ecology, who testified for DER. Dr. Arnold Banner of the United States Fish and Wildlife Service concurred with Dr. Marsh that the eradication of the productive system would result in the removal of a significant source of food and habitat. The evidence shows that a wetland habitat such as the project site affords approximately 535 pounds of fishing products per year with a dollar value of $8,000 per acre to the public. Petitioner argues that it would be in the public interest to bulkhead and fill the subject property because rodents would be eliminated, trash and debris would no longer collect on the property and that further erosion of the property would be prevented. However, Urbanek has failed to establish with substantial competent evidence that there actually exists a rodent problem on the subject property. The evidence does establish that trash and debris collect among the root system of the vegetation and that severe erosion has occurred on the property from wave action created by vessels moving through the Intra- Coastal Waterway. Urbanek has failed to establish with substantial competent evidence that the proposed project will not degrade water quality, cause violation of water quality standards or criteria or cause pollution. In fact, no evidence was submitted whatsoever by Urbanek which would tend to prove any of these three preconditions to the granting of the requested permit. Nonetheless, DER's failure to act on the permit application within the time limits prescribed by Subsection 120.60 (2), Florida Statutes, as amended in 1976, mandates the issuance of the requested permit.
Findings Of Fact Respondent Charles T. Noegel has been in the pest control business for some sixteen years. In February of 1976, the petitioner Office of Entomology sent all licensees a license renewal application for a license to be effective on March 31, 1976. Petitioner received a check from respondent, but the proceeds thereof were applied to review respondent's pest control operator's certificates. A check sent by respondent during 1975 had been returned for insufficient funds. A pest control business license cannot be issued unless there is evidence of a current operator's certificate in existence. Petitioner did not receive respondent's application or a check for the license which was to be effective on March 31, 1976. In June of 1976, petitioner notified respondent that they needed his application and a check for the renewed license. They also sent him an application form. According to respondent, he did not receive the entire application form. Respondent testified that he telephoned the petitioner's office in Jacksonville on two or three occasions and told a secretary there that he did not have a complete application form. In March of 1977, Mr. Page from petitioner's office called respondent. Respondent was not available and Mr. Page left the message with respondent's answering service that respondent was operating illegally without a license and asked Mr. Noegel to call him. Mr. Page received no reply from this message. According to Mr. Noegel, he received the message but did not receive the name or telephone number of the person who left the message. In April of 1977, petitioner did receive from respondent an application for the renewal of his operator's certificate and a check. Respondent has been delinquent in the past in applying for his license, and various checks have been returned for insufficient funds. Had respondent timely applied and paid for the renewal of his March 31, 1976, license, petitioner would have issued the license to him. By certified letter dated August 10, 1978, petitioner notified respondent that his pest control operator's certificate number 519 was being revoked for failure to comply with Chapter 482 of the Florida Statutes and Chapter 10D-55 of the Florida Administrative Code. Generally, respondent was charged with conducting his pest control business, known as the Seminole-Gator Exterminator, without a license. While more specific charges are contained in the August 10, 1978, letter, petitioner offered no evidence at the administrative hearing to substantiate such specific allegations.
Recommendation Based upon the findings of fact and conclusions of law recited above, it is recommended that petitioner find that respondent violated Section 482.071(1) by operating his business without a valid license. It is further recommended that respondent's operator's certificate number 519 be suspended for a period of sixty (60) days from August 10, 1978, and that upon the payment of all back license renewal fees, respondent's certificate be reinstated, and respondent be placed on probation for a period of eighteen months. The terms of probation should include the timely renewal and payment of all permits required by petitioner's laws and regulations. Respectfully submitted and entered this 6th day of October, 1978, in Tallahassee, Florida. DIANE D. TREMOR Hearing Officer Division of Administrative Hearings 530 Carlton Building Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 6th day of October, 1978. COPIES FURNISHED: Charles T. Noegel Entomologist - Manager Seminole Gator Exterminator 1409 Pichard Drive Tallahassee, Florida 32304 Donna Stinson, Esq. Department of HRS 2639 N Monroe Street Suite 200-A Tallahassee, Florida 32304 William J. Page, Jr., Secretary Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, Florida 32301 Andrew J. Rogers Director, Office of Entomology Department of HRS Post Office Box 210 Jacksonville, Florida 32231 =================================================================