BEN F. WARD, JR., AND E. L. C. PARTNERSHIP vs. DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES, 87-003541 (1987)
Division of Administrative Hearings, Florida Number: 87-003541 Latest Update: Feb. 18, 1988

The Issue Whether a septic tank permit, should be granted for lot 2, Whispering Oaks Subdivision. More specifically, does the' requirement of no more than four lots per acre require a minimum lot size of 1/4 acre? In the alternative, must the subject lot be grouped with three contiguous lots to determine whether the density requirement is met? If a permit should be denied, is a variance appropriate under HRS' rules and the circumstances of the case?

Findings Of Fact The essential facts in this case are uncontroverted. Ben F. Ward is the President and sole stockholder of Ben Ward, Incorporated. His business for over eighteen years has been real estate, construction and development. He has built over 300 homes and is familiar with the procedures for developing a subdivision, including obtaining septic tank permits. In 1979, Ben Ward purchased the property now designated Whispering Oaks Subdivision, located in the City of Oviedo, Seminole County, Florida. The property contains approximately six acres, net. That is, the paved right of ways have been disregarded. There are no streams, lakes or other bodies of surface water on the property. Ward subdivided his property into 26 lots, two of which, lots number 12 and 17, are dedicated for recreational use and will not have homes. Some of the lots are less than 1/4 acre; others are more. Lot number 2 has 9,137 square feet, 1,753 square feet less than 1/4 acre. As a condition of plat approval, the City of Oviedo required Ward to obtain approval from the Seminole County Health Department. Val Roberts was the county health officer with whom Ward consulted. A process was devised for "borrowing" acreage from lots of over 1/4 acre to meet the minimum requirements for lots less than 1/4 acre. In other words, it was determined that the total net acreage in the subdivision would be considered in computing the four lots per acre minimum. The plat was approved and was recorded in 1980. Between 1981 and 1987, 19 residences were built and septic tank permits were obtained. There is city water service in the subdivision. In 1985, Ward sold 16 lots to the Erie Land Company, a partnership comprised of Mary Ellen Hines and her husband. In reliance on the arrangement worked out with the health department, Ward assured ELC that the lots were buildable. He remained trustee of the property. On February 26, 1987, the Seminole County Health Department (HRS) denied Ward's application for a septic tank permit for lot number 2, including a 3-bedroom, 2-1/2-bath home, comprising 2100 square feet. The denial letter cites rule 10D-6.46(7)(b), F.A.C., and says "Four lots grouped together lack approximately 3000 square feet of meeting the required lot size...". The letter provides the procedure for petition for a variance to Rule 10D-6, F.A.C. Ward applied for the variance, and its approval was recommended by a vote of 3-2 by the HRS Review Group for Individual Sewage Disposal. The recommendation was denied by the HRS State Health Officer, E. Charlton Prather, M.D. in a letter dated May 7, 1987 which states, in pertinent part: Grouping of lots to determine whether the subdivision meets the four lot per acre requirement must be done in a logical manner to maximize the homogenous dissemination of sewage effluent or prevent a concentration of sewage effluent in a small or limited area. Once a specific area is utilized in calculating sewage flow dispersal for a group of lots, that area cannot be further used for another lot or group of lots. Lot number 2 meets all requirements of HRS for septic tanks, with the exception of the density methodology. Ward surveyed the homes built and occupied for approximately a year and found that the subdivision as a whole is about 60% of allowable capacity. Ms. Haynes has lived on lot number 22 for six years and has never had septic tank problems. She holds an inactive real estate license, and before purchasing the property found the subdivision high and dry and well-developed.

Recommendation Based on the foregoing, it is, hereby RECOMMENDED: That the application for septic tank permit for lot 2, Whispering Oaks subdivision, be GRANTED. DONE and RECOMMENDED this 18th day of February, 1988, in Tallahassee, Florida. MARY CLARK Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 18th day of February, 1988. COPIES FURNISHED: Ben F. Ward, Jr. Ben Ward Agency, Inc. P. O. Box 670 Oviedo, Florida 32765 John A. Baldwin, Esquire Baldwin & Baum 7100 S. Highway 17-92 Fern Park, Florida 32730 James A. Sawyer, Jr., Esquire HRS District 7 Legal Counsel 400 W. Robinson St., Suite 911 Orlando, Florida 32801 Sam Power, Clerk Department of Health and Rehabilitative Services 1323 Winewood Boulevard Building One, Suite 407 Tallahassee, Florida 32399-0700 Gregory L. Coler, Secretary Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, Florida 32399-0700 John Miller, Esquire Acting General Counsel Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, Florida 32399-0700

Florida Laws (1) 120.57
# 1
DEPARTMENT OF HEALTH vs NOEL SANFIEL, 00-002435 (2000)
Division of Administrative Hearings, Florida Filed:West Palm Beach, Florida Jun. 12, 2000 Number: 00-002435 Latest Update: May 31, 2001

The Issue Whether Respondent committed the violations as set forth in the Citation for Violation, Onsite Sewage Program/Sanitary Nuisance dated April 28, 2000.

Findings Of Fact Petitioner is authorized and given the jurisdiction to regulate the construction, installation, modification, abandonment, or repair of onsite sewage treatment and disposal systems, including drainfields, by septic tank contractors. At all times material hereto, Respondent was a registered septic tank contractor and, as such, he was authorized to provide septic tank contracting services, including the installation and repair of drainfields. On or about November 2, 1995, Petitioner issued a permit (Permit No. RP648-95) to Wilmar Rodriguez for the repair of a septic tank system at 417-421 Perry Avenue, Greenacres, Florida. The property was a triplex, which was purchased by Mr. Rodriquez in 1981. Mr. Rodriguez has no knowledge as to whether any drainfields were installed or replaced on the property, prior to 1981. The Permit included the installation of a new multi- chambered septic tank, a dosing tank, a lift station, and a new drainfield. The Permit was also for a filled system and called for the drainfield to be 700 square feet. Respondent was indicated as the "agent" on the Permit. Respondent and/or his employees performed the work under the Permit. Respondent was the septic tank contractor for the repair of the septic tank system under the Permit. On November 9, 1995, the construction of the septic tank system was approved by one of Petitioner's inspectors, who was an Environmental Specialist I. Petitioner's inspectors are not present during the entire construction or repair of a septic tank system or drainfield. Usually, inspections are made after the completion of the construction or repair of the septic tank system. Additionally, the inspection of a drainfield is usually performed after the rock has been placed on top of the drainfield. On February 2, 1996, the same inspector performed the inspection after the completion of the construction of the septic tank system, including after the placing of the rock on top of the drainfield. Even though the Permit reflects a filled system, the filled/mound system section on the inspection sheet was crossed out. The inspector considered the system to be a standard system, not a filled or mound system, and, therefore, inspected it as a standard system. In inspecting a drainfield, the inspection by an inspector includes checking to ensure that a drainfield has 42 inches of clean soil below the drainfield. An inspector uses an instrument that bores down through the rock and brings up a sample of the soil, which is referred to as augering. Augering is randomly performed at two locations. For the instant case, the inspector performed the augering in two random locations of the drainfield, which were in the area of the middle top and the middle bottom. The samples failed to reveal anything suspect; they were clean. On February 2, 1996, the inspector issued a final approval for the septic tank system. Final approval included the disposal of "spoil" and the covering of the septic tank system with "acceptable soil". The inspector mistakenly inspected the system as a standard system. He should have inspected the system as a filled system.1 After the repair and installation of the septic tank system by Respondent, Mr. Rodriguez continued to have problems with the septic tank system. He contacted Respondent three or four times regarding problems with the system, but the problems persisted. Each time, Respondent was paid by Mr. Rodriguez. Sewage water was flowing into the street where the property was located and backing-up into the inside of the triplex. Having gotten no relief from Respondent, Mr. Rodriguez decided to contact someone else to correct the problem. Mr. Rodriguez contacted Richard Gillikin, who was a registered septic tank contractor. On October 14, 1999, a construction permit was issued to Mr. Rodriguez for the repair of the septic tank system. Mr. Gillikin was indicated as the agent. Mr. Gillikin visited the property site of the triplex and reviewed the problem. He determined that the drainfield was not properly functioning, but he did not know the cause of the malfunctioning. With the assistance of Petitioner's inspectors, Mr. Gillikin and Mr. Rodriguez attempted to determine the best method to deal with the problem. After eliminating options, Mr. Rodriguez decided to replace the drainfield. To replace the drainfield, Mr. Gillikin began excavating. He began removing the soil cover and the rock layer of the drainfield. Mr. Gillikin also wanted to know how deep he had to dig to find good soil. After digging for that purpose and for 10 to 12 inches, he discovered a drainfield below Respondent's drainfield. The drainfield that Mr. Gillikin discovered was a rock bed 12 inches thick in which pipes were located and, as indicated, 10 to 12 inches below Respondent's drainfield. Mr. Gillikin also dug a hole two to three feet deep, pumped the water out of the hole, and saw the old drainfield. Mr. Gillikin determined that the old drainfield extended the full length of Respondent's drainfield. As a result of Mr. Gillikin's determining that the old drainfield was below Respondent's drainfield, both drainfields had to be removed and the expense of a new drainfield increased. Leon Barnes, an Environmental Specialist II for Petitioner, who was also certified in the septic tank program, viewed the drainfield site. He determined that the old drainfield was below Respondent's drainfield and that, therefore, Respondent had not removed the old drainfield. On or about November 6, 1999, Mr. Barnes' supervisor, Jim Carter, and co-worker, Russell Weaver, who is an Engineer, also visited the drainfield site. Mr. Weaver determined that the old drainfield covered a little more than 50 percent of the area under Respondent's drainfield. On November 8, 1999, a construction inspection and a final inspection of the system installed by Mr. Gillikin were performed. The system was approved. Respondent admits that a new drainfield is prohibited from being installed over an old drainfield. However, Respondent denies that he installed a new drainfield over the old drainfield on Mr. Rodriguez's property. In 1995, Respondent failed to completely remove the old drainfield before he installed the new drainfield. The soil and rocks from the old drainfield, which was not functioning, were contaminated spoil material. Because the old drainfield was not completely removed, the contaminated spoil material remained in the drainfield and was used as part of the material in the installation of the new drainfield. Leaving the contaminated spoil material in the new drainfield, prevented the sewage water from being able to percolate through the ground, which is a method of cleansing the sewage water. Without being able to percolate through the ground, the sewage water remained on the surface of the drainfield, creating a serious sanitary nuisance and health hazard. The sewage water spilled onto the street and backed-up into the triplex. Respondent was issued a Citation for Violation, Onsite Sewage Program/Sanitary Nuisance by Petitioner.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Health, Palm Beach County Health Department, enter a final order: Affirming the Citation for Violation, Onsite Sewage Program/Sanitary Nuisance and finding that Noel Sanfiel violated Section 381.0065, Florida Statutes (1995), and Rule 10D- 6.0571(4), now Rule 64E-6.015(6), and Rule 10D-6.0751(1)(l)1, now 64E-6.022(1)(l)1, Florida Administrative Code. Imposing a fine of $500. DONE AND ENTERED this 13th day of February, 2001, in Tallahassee, Leon County, Florida. ERROL H. POWELL Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 13th day of February, 2001.

Florida Laws (5) 120.569120.57381.0065381.00655381.0067 Florida Administrative Code (2) 64E-6.01564E-6.022
# 2
DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES vs HYACINTH D. WYNTER, 96-005560 (1996)
Division of Administrative Hearings, Florida Filed:Oviedo, Florida Nov. 22, 1996 Number: 96-005560 Latest Update: Apr. 12, 1999

The Issue Whether Respondent is guilty of creating, keeping, or maintaining a nuisance injurious to health in violation of Section 386.041(1)(b), Florida Statutes, as set forth in the Citation for Violation, dated August 19, 1996.

Findings Of Fact Petitioner, Department of Health, the successor agency to the Department of Health and Rehabilitative Services, is the state agency charged with the responsibility of investigating and correcting sanitary nuisances in this state. The Respondent, Hyacinth D. Wynter, now known as Hyacinth D. Wallace, has owned a private residence and kennels located at 2323 Tuscawilla Road, Winter Springs, Florida, from 1996 to the present. On or about June 19, 1996, the Seminole County Public Health Unit received a complaint of a possible sanitary nuisance existing on the Respondent’s property. On June 21, 1996, an inspection of Respondent’s property revealed that the property contained a large home with a septic tank and drain field in the front yard and another in the back yard. A kennel for small animals and an apartment was also located in the rear of the property. The septic tank and drain field in the rear of the property was located in a low spot which was subject to the accumulation of surface water runoff from the kennel and during periods of above-average rainfall. Observation revealed standing water in the back yard. The water showed discoloration and had a pungent odor. However, no solid waste was visible. Subsequent tests for sewage contamination was inconclusive. This observation indicated the drain field had failed. Respondent was given a Sanitary Nuisance form letter which recommended that the septic tank be pumped, the ground disinfected and the drainfield be repaired within ten days. Respondent contacted two septic tank companies in late June and received estimates on pumping the septic tank and on the repair and improvement of the septic system. Respondent retained one of the companies to pump the septic tank. The septic tank company was unable to complete the job prior to Petitioner’s reinspection on July 2, 1997, because of above normal rainfall and the inability to get its truck into the Respondent’s back yard. Petitioner reinspected Respondent’s property on July 2, 1997 and observed the same conditions as was observed on June 21, 1997. A three day extension was granted to Respondent, in order for the tank to be pumped. On July 3, 1997, Orlando Septic Tank Service, Inc. pumped the septic tank and disinfected the area. It also advised Respondent that the drainfield had failed and would need to be replaced. On July 8, 1997, Respondent inspected the area again and observed the same conditions as on the prior inspections. An Official Notice to Abate a Sanitary Nuisance and a Notice of Intended Action was issued by Respondent on July 11, 1997. It was served on Respondent, by posting and by certified mail, on July 12, 1997. Respondent was directed to abate the nuisance within 7 days of the notice or an administrative fine would be imposed. Respondent began to disinfect the area with lime on a daily basis, until the drainfield was repaired. The low area with the standing water was bordered off with visible construction type ribbon and visitors coming to the premises were advised to stay clear of the area. Respondent authorized Orlando Septic Tank Service to submit a permit application to replace the drainfield in accordance with the specifications approved by the Petitioner. The application was submitted on July 17, 1996. The permit was issued on July 24, 1996. On July 25, 1997, Respondent received a proposal from Orlando Septic Service to install an elevated drainfield on the site for the sum of $4,288.50. Respondent was not able to financially afford to authorize this work without obtaining financing for the project. When financing was obtained, Respondent accepted the proposal and then authorized the work on August 8, 1996. Due to other obligations, Orlando Septic was not able to give a proposed starting date for the project until August 26, 1996. On August 13, 1996, Petitioner inspected the Respondent’s property again and observed the same conditions as on previous inspections. Petitioner was informed of the projected starting date for repair of the drainfield, however, a Citation for Violation was issued on August 16, 1996 calling for corrective actions to abate the condition by 4:00 p.m. August 19, 1996. On August 27, 1996, the septic tank was pumped again. Orlando Septic Service was scheduled to begin work on the repair of the drainfield on August 26, 1996. On that same date, the company called Respondent and informed her that they were delayed on another job and could not begin repair of Respondent’s drainfield until sometime in September. Respondent immediately called another company and gave them the contract. The repair was completed on September 10, 1996. The evidence was insufficient to establish that a sanitary nuisance existed on Respondent’s property on August 16, 1996.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED as follows: The Respondent, Hyacinth D. Wynter, be found not guilty of violations Sections 386.041(b), Florida Statutes. The Notice of Intended Action be revoked. DONE and ENTERED this 30th day of May, 1997, in Tallahassee, Florida. DANIEL M. KILBRIDE Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (904) 488-9675 SUNCOM 278-9675 Fax Filing (904) 921-6847 Filed with the Clerk of the Division of Administrative Hearings this 30th day of May, 1997. COPIES FURNISHED: Sonia Nieves Burton, Esquire Department of Health 400 West Robinson Street Orlando, Florida 32801 Michael D. Jones, Esquire Atrium II Building 301 West State Road 434, Suite 317 Winter Springs, Florida 32708 Catherine H. Berry Legal Office Duval County Health Department 515 West 6th Street Jacksonville, Florida 32206-4397 Gregory D. Venz, Agency Clerk Department of Children & Families Building 2 Room 204 1317 Winewood Boulevard Tallahassee, Florida 32399-0700 Pete Peterson, Esquire 1317 Winewood Boulevard Building 6 Room 102-E Tallahassee, Florida 32399-0700

Florida Laws (7) 120.57381.0061386.01386.02386.03386.041823.01
# 3
JAMES L. SMITH vs DEPARTMENT OF HEALTH, 05-004354 (2005)
Division of Administrative Hearings, Florida Filed:Jacksonville, Florida Nov. 29, 2005 Number: 05-004354 Latest Update: Jun. 29, 2006

The Issue The issue is whether Petitioner created a sanitary nuisance in violation of Florida Administrative Code Rule 64E- 6.022(1)(d)(l) and (q) and, if so, the proper penalty.

Findings Of Fact The Department of Health, Duval County Health Department (Department), is the agency charged with enforcing the statutory and regulatory provisions pertaining to septic tank installations and repairs in Florida, pursuant to Section 381.0065, Florida Statutes, and Florida Administrative Code Chapter 64E-6. Mr. Smith is a qualified contractor employed by All Florida Septic Tank Service, Inc. (All Florida). The citation issued on April 15, 2004, identifies Mr. Smith's registration number as SR0011389 and All Florida's registration number as SA0000956. The citation describes the alleged violations as follows: On March 8, 2004, a repair application was submitted to the Duval County Health Department (DCHD) for 8817 & 8821 Bellrose Avenue, Jacksonville, FL 32244. All Florida Septic Tank Service, Inc. was indicated as the agent for the applicant/property owner, Ben Lewis. On April 8, 2004, Robert Hoag, qualifying contractor for Plumbing and Contracting by Hoag, disconnected the stub out line running from the house to the existing septic tank prior to installation of new septic tanks thus creating a sanitary nuisance. The existing septic tanks were abandoned at said property by All Florida Septic Tank Service, Inc.; DCHD was not notified of tank abandonment as required for inspection. Water supply was not turned off during he time of construction. On April 9, 2004, Colleen Bierbach, DCHD inspector, observed and photographed prima facie evidence of untreated human waste discharge onto ground surface at 8817 & 8821 Bellrose Avenue. Mr. Smith accepted the citation on April 15, 2004. On the same date, Mr. Smith wrote a letter to Scott Turner of the Department of Health, in response to the citation. His letter reads as follows: Mr Scott Turner, On April 8, 2004 All Florida Septic Tank Service Inc. started a job at 8817 and 8821 Bellrose Avenue in which new tanks and drainfields were required. In order for the new drainfield to be installed the existing tank had to be abandon [sic] prior to any work being done. The two existing referenced tanks were properly pumped out an abandoned on April 8, 2004. The new septic tanks were scheduled to be installed that same day. Due to mechanical problems with the crane truck, the tanks were unable to be set that day, causing the contracted plumber, Robert Hoag, to be unable to tie in the new sewer line. On the following day April 9, 2004 tanks (1500 gallon septic tank) and (750 gallon dosing tank) were installed with a different truck. At that time the contracted plumber was onsite to immediately tie in the sewer line. In the mean time the Duval County Health Department came to do the required inspection of the new system, at which time Colleen Bierback of the Health Department observed a small amount of sewage on the ground and photographed the site. Mr. Hoag immediately tied the sewer in at the same time, fixing the sanitary nuisance within one hour after inspection. According to Mr. Smith, sanitary problems existed at this work site for months. That is, raw sewage had been coming out of the old septic system for a long time. In Mr. Smith's words, "I was there to fix the sanitary nuisance, not create it." The owner of the property in question engaged Mr. Hoag, of Plumbing and Contracting by Hoag, to accomplish the plumbing portion of the operation. While Mr. Smith's letter stated that the new septic tanks were actually installed on April 9, 2004, Mr. Smith testified at hearing that he performed excavation services, installed a new drainfield and set the new septic tanks on April 8, 2004. The sand and new drainfield had to be put in first and the new tanks installed last. The plumber, Mr. Hoag, would be responsible to make the necessary pipe connection on the new tanks. However, Mr. Hoag did not make the necessary pipe connection and the occupants of the residences used the facilities between April 8, 2004, and April 9, 2004. Mr. Smith did not call anyone to inspect the old septic tank upon abandonment. According to Mr. Smith, it is common practice in the Jacksonville area to not call for an "abandonment" inspection when the contractor has a permit to install a new tank. The Department's inspector, Colleen Bierbach, acknowledged that All Florida called for an installation inspection of newly installed tanks on April 8, 2004. On the morning of April 9, 2004, after the new tanks had been installed, Ms. Bierbach went to 8817 and 8821 Bellrose Avenue. She observed raw sewage on the ground flowing toward the septic tanks. She took photographs of what she observed, but the copies of the photographs received in evidence are too blurry to show the extent of what she saw. Mr. Smith arrived at the work site just after Ms. Bierbach arrived on April 9, 2004. The description of the violation in the citation states that Mr. Hoag, the plumber, "disconnected the stub out line running from the house to the existing septic tank prior to the installation of the new septic tanks thus creating a sanitary nuisance." The evidence is insufficient to prove that Mr. Smith's actions, as opposed to the actions of Mr. Hoag, caused the unsanitary conditions.

Recommendation Based upon the Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Health, Duval County Health Department, dismiss the citation issued to Mr. Smith on April 15, 2004. DONE AND ENTERED this 26th day of April, 2006, in Tallahassee, Leon County, Florida. S BARBARA J. STAROS Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 26th day of April, 2006. COPIES FURNISHED: Catherine R. Berry, Esquire Department of Health 515 West Sixth Street Jacksonville, Florida 32206-4311 James L. Smith All Florida Septic Tank Service, Inc. 8300 W. Beaver Street Jacksonville, Florida 32220 R. S. Power, Agency Clerk Department of Health 4052 Bald Cypress Way, Bin A02 Tallahassee, Florida 32399-1701 Timothy M. Cerio, General Counsel Department of Health 4052 Bald Cypress Way, Bin A02 Tallahassee, Florida 32399-1701 Dr. M. Rony Francois, Secretary Department of Health 4052 Bald Cypress Way, Bin A00 Tallahassee, Florida 32399-1701

Florida Laws (6) 120.57381.0012381.0061381.0065386.03386.041
# 4
SHIRLEY DAVIS vs DEPARTMENT OF HEALTH, 02-001930 (2002)
Division of Administrative Hearings, Florida Filed:New Smyrna Beach, Florida May 10, 2002 Number: 02-001930 Latest Update: Oct. 25, 2002

The Issue The issue to be resolved in this proceeding concerns whether the Petitioner violated the provisions of Chapter 381, Florida Statutes, and Chapter 64E-6, Florida Administrative Code, referenced herein, by allegedly illegally connecting a second dwelling to an existing, approved septic system.

Findings Of Fact On January 17, 2002, the Petitioner was given a written Notice of Violation and advised that an illegal sewer connection from a new or second mobile home on her property to her existing sewer system, serving her primary residence would have to be disconnected. It was an illegal second connection on a single, permitted sanitary sewer system. The second home was not occupied and could not be legally occupied until the proper sewer connection and relevant permitting was obtained. On January 30, 2002, the inspector again visited the premises and determined the illegal connection to still exist and the Petitioner was then advised that the illegal connection would have to be disconnected. On February 28, 2002, the inspector returned and found that the illegal connection had been restored to the existing system. He observed a person hurriedly disconnect the system as he approached. The relevant pipe joint had been left un-glued so that it could be readily connected or disconnected. He again notified the Petitioner, in person, that the illegal connection would have to be disconnected. The Respondent cited the Petitioner for the illegally connected sewer system and seeks to impose a $500.00 fine. The Petitioner elected to formally dispute the position of the Respondent agency and pursued a formal hearing to contest the allegations. The Petitioner failed to actually appear at hearing and contest the evidence adduced by the Respondent agency. That evidence is credible and is accepted as unrefuted and supportive of the above Findings of Fact.

Recommendation RECOMMENDED that a final order be entered by the State of Florida Department of Health denying the Petition of Shirley Davis in its entirety and that a final order be entered imposing a $500.00, fine for the violations described in the above Findings of Fact and Conclusions of Law. DONE AND ENTERED this 16th day of September, 2002, in Tallahassee, Leon County, Florida. P. MICHAEL RUFF Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with Clerk of the Division of Administrative Hearings this 16th day of September, 2002. COPIES FURNISHED: Shirley Davis 140 West Putnam Grove Road Oak Hill, Florida 32759 John D. Lacko, Esquire Department of Health 420 Fentress Boulevard Daytona Beach, Florida 32114 R. S. Power, Agency Clerk Department of Health 4052 Bald Cypress Way, Bin A02 Tallahassee, Florida 32399-1701 William W. Large, General Counsel Department of Health 4052 Bald Cypress Way, Bin A02 Tallahassee, Florida 32399-1701

Florida Laws (3) 120.569120.57381.0065
# 5
ERNEST AND IRENE SCHUSTICK, ET AL. vs. HAL THOMAS REID ASSOCIATES AND DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES, 83-001516 (1983)
Division of Administrative Hearings, Florida Number: 83-001516 Latest Update: Oct. 25, 1983

Findings Of Fact On October 15, 1982, Hal Thomas Reid Associates applied for a septic tank permit to serve a 16-room motel. On February 2, 1983, this application was amended to a 5,800 gallon septic tank to serve a 32-unit condominium and office. The lot on which this drain field is to be located is 70 feet by 100 feet. When the application was filed, the lot was inspected by the Citrus County Health Department. The elevation of the land averaged 2.5 to 2.9 feet above mean sea level. The 10-year flood plane in this area is 4.9 feet. Occasional high tides inundate this area; however, the water drains off rapidly and no one testified that water ever remained standing as long as seven consecutive days. Usually the water drains off in less than 24 hours. On March 1, 1983, an extremely high tide flooded this area and roads in the vicinity to a depth of approximately one foot. This water remained on the site less than 24 hours. The site is not located adjacent to state waters, is not an area designated as wetlands, and is without the dredge and fill permitting jurisdiction of the United States Army Corps of Engineers and the Florida Department of Environmental Regulation (Exhibits 20 and 21). By adding five feet of fill to the site, the bottom of the gravel below the drain pipes will be above the 10-year flood plane. The drain field capacity is adequate to handle the flow from 33 bathrooms of residential units. In approving this permit, the Citrus County Health Department used the 150 gallons per day discharge for residential units rather than the 100 gallons per day discharge from a motel unit. The water table at this location is two feet above mean sea level. This is determined by the elevation reached at high tides for 14 consecutive days. As a condition to Citrus County withdrawing as an intervenor in these proceedings, Applicant agrees: To revegetate and restore any alleged wetlands affected by the permit to a like or similar condition; To install three shallow draft monitor wells around the drain field towards the wetlands area adjacent to the site and towards Woods 'n Waters subdivision, establish an existing level of bacteria count prior to the activation of the septic tank, and to monitor said wells through the Citrus County Health Department on a quarterly basis; and In the event any monitor wells shall test at an unsatisfactory level, Applicant will forthwith correct this condition to the satis- faction of the Citrus County Health Department. This application meets all of the code requirements of Chapter 10D-6, Florida Administrative Code.

# 6
MAY I. BOBBITT vs ALLEN C. D. SCOTT, II, AND DEPARTMENT OF HEALTH, 99-003584 (1999)
Division of Administrative Hearings, Florida Filed:St. Augustine, Florida Aug. 23, 1999 Number: 99-003584 Latest Update: Sep. 11, 2000

The Issue The issue in this case is whether a variance for a reduced setback from Petitioner's well to Respondent Allen C.D. Scott, II's (Scott) septic system should be granted by the Department of Health.

Findings Of Fact Allen C.D. Scott, II, owns property designated as Lot 13, Block 11, Vilano Beach Subdivision, 40 Viejo Street in St. Johns County, Florida. Mr. Scott's property is undeveloped, except for a drinking water well located in the northwest quadrant of his property. The well was installed within the past year. There are residential homes on the north, south, and west sides of the property. The beach is on the east of the property. The property is 50 feet wide and 125 feet deep. The property is not served by a public or private utility; thus, Mr. Scott must provide his own drinking water well and septic system. Mr. Scott purchased the property from Alexander A. Morese, Jr. Mr. Scott was Morese's attorney of record for issues concerning this property and the proposed septic tank system. The neighboring property to the north of Mr. Scott's property is owned by Petitioner, May Bobbitt. Petitioner has two wells on her property. A fairly recently-installed drinking water well and an irrigation well. The irrigation well, is located 30 feet from a site on Mr. Scott's property proposed for an on-site septic system. The location of the proposed septic tank is less than the required setback from a septic system to an irrigation well of 50 feet. The potable drinking water well is 225 feet deep, pit- cased and terminates in the Floridan aquifer. It is within 65 feet of Ms. Bobbitt's septic tank system and is located 50 feet from the proposed site of Mr. Scott's septic system. The location of the proposed septic tank is less than the required setback from a potable drinking water well to a septic system of 75 feet. The initial permit for Ms. Bobbitt's drinking water well was denied based on its proximity to her septic tank. Ms. Bobbitt challenged the denial in an informal proceeding before DOH (DOH case number 97-023H). Mr. Morese played some role in that proceeding. In the meantime, the initial septic tank permit application filed by Mr. Morese was denied by DOH based on the location of Ms. Bobbitt's drinking water well. Mr. Morese appealed the denial to the DOAH Case No. 98-3283. Sometime in late 1997, DOH granted Ms. Bobbitt a variance for a 65-foot setback distance from her drinking water well to her septic system. The variance resulted after settlement of the administrative actions involving May Bobbitt and Mr. Morese's permitting her well and Mr. Morese's septic tank. The variance was granted because the construction of the well prevents contamination of the well from the septic system. Both cases were separately terminated. On November 5, 1997, Mr. Morese applied to DOH for a variance to reduce the setback distances from Petitioner's two wells to Mr. Morese's proposed septic system. Since Mr. Morese's property was 50 feet wide and Mr. Morese desired to build a two-bedroom home on the property, there was limited area available to construct the septic system. The proposed septic system is located in the only area available for such a system and is the same location proposed by Respondent Scott. A sign was posted on Mr. Morese's property notifying Ms. Bobbitt of Mr. Morese's variance request. The variance committee recommended approval of the Morese variance with specific provisos at their December 1997, meeting. Dr. Richard Hunter, Department of Health Deputy State Health Officer, approved the variance with provisos by letter to Mr. Morese on December 17, 1997. The letter stated the approval as follows: The onsite sewage treatment and disposal system shall be set back from the irrigation well on lot 14 by the maximum distance attainable but not less than 30 feet when installed. The onsite sewage treatment and disposal system shall be set back from the drinking water supply well on lot 14 by the maximum distance attainable but not less than 50 feet when installed. The onsite sewage treatment and disposal system drainfield elevation shall be based on a seasonal high water table no lower than 12 inches below existing grade based on William G. Harb's report of November 13, 1997. The variance approval was not challenged by Petitioner or any other neighbor. The variance was granted for a period of one year from the date of Dr. Hunter's letter. As indicated, Allen C.D. Scott, II, purchased the property from Mr. Morese. When Mr. Scott purchased the property from Mr. Morese, the variance was transferred to Mr. Scott. After Mr. Scott purchased the property, he hired an engineer to assist him in securing a Department of Environmental Protection (DEP) coastal construction control permit. The permit was finally issued on May 13, 1999. The variance granted Mr. Morese and subsequently transferred to Mr. Scott expired December 18, 1998. Thus, by the time Mr. Scott obtained his DEP permit to put fill on his property in order to construct his septic system, the variance for reduced setbacks from Petitioner's wells had expired. On June 14, 1999, Mr. Scott applied to DOH for a variance to reduce the required setbacks from Petitioner's irrigation and drinking water wells to his proposed septic system. Mr. Scott's variance application requested the exact same setbacks that Mr. Morese had been granted in December 1997. For the same reasons the variance review committee recommended approval of the Morese the committee recommended approval of the Scott variance. Dr. Sharon Heber, Director of Environmental Health, DOH, granted the variance by letter on July 2, 1999. The letter contained the same provisions as Mr. Morese received in December 1997. The evidence demonstrated that the requested variance would not adversely impact anyone's health or degrade ground or surface waters. Moreover, the evidence showed that the variance met all other Department criteria for an onsite sewage disposal system. Don Hallman, professional engineer, testified that the pit casing of Ms. Bobbitt's well provides an additional layer of protection from contamination sources. He further explained that Petitioner's deep well was cased in a consolidated formation which furnished protection from surface and lateral contaminants. Mike Turner testified that he has permitted and/or had experience with two thousand or more wells in his job with the St. Johns Water Management District. He stated unequivocally that Ms. Bobbitt's deep, pit-cased well was in no more danger from contamination from Scott's septic system, 50 feet away, than it is from the 65-foot reduced setback distance to her own septic system. Given these facts, Respondent is entitled to a variance for his proposed septic tank system.

Recommendation Based upon the findings of fact and conclusions of law, it is RECOMMENDED: That the variance should be granted by the Department of Health and Petitioner's challenge dismissed. DONE AND ENTERED this 8th day of June, 2000, in Tallahassee, Leon County, Florida. DIANE CLEAVINGER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 8th day of June, 2000. COPIES FURNISHED: Charlene J. Petersen, Esquire Department of Health 420 Fentress Boulevard Daytona Beach, Florida 32114 May Bobbitt 41 Zamora Street St. Augustine, Florida 32095 Allen C. D. Scott, II, Esquire 101 Orange Street St. Augustine, Florida 32084 Angela T. Hall, Agency Clerk Department of Health Bin A02 2020 Capital Circle, Southeast Tallahassee, Florida 32399-1703 William Langue, General Counsel Department of Health Bin A02 2020 Capital Circle, Southeast Tallahassee, Florida 32399-1701 Dr. Robert G. Brooks, Secretary Department of Health Bin A00 2020 Capital Circle, Southeast Tallahassee, Florida 32399-1701

Florida Laws (2) 120.57381.0065 Florida Administrative Code (1) 64E-6.005
# 7
JAMES W. SLUSHER, JR. vs MARTIN COUNTY AND SOUTH FLORIDA WATER MANAGEMENT DISTRICT, 00-003853 (2000)
Division of Administrative Hearings, Florida Filed:Stuart, Florida Sep. 15, 2000 Number: 00-003853 Latest Update: Dec. 18, 2003

The Issue The issues presented for decision in this case are: whether Martin County should be granted the re-issuance of Water Use Permit No. 43-00752W for the Tropical Farms Water Treatment Plant and associated wells; and (2) whether Martin County should be granted Water Well Construction Permit No. SF032696B for the construction of Well No. 10 of the Tropical Farms Water Treatment Plant, pursuant to the permitting criteria of Chapter 373, Parts II and III, Florida Statutes; Chapters 40E-2 and 40E-3, Florida Administrative Code; and the Basis for Review for Water Use Permit Applications of the South Florida Water Management District.

Findings Of Fact Petitioner James W. Slusher, Jr., and his wife, Diane L. Slusher, own a residential lot located in unincorporated Martin County at 2376 SW Ranch Trail, Stuart, Florida 34997. On the lot is a single family home. The size of the residential lot is approximately 2.25 acres. Mr. and Mrs. Slusher purchased the subject residential lot and home in September of 1994 from Mrs. Stella Kassinger. Mrs. Kassinger and her late husband (the “original owners”) had the home built on the residential lot in approximately 1980. When the original owners built the home, they had a hole or “pit” dug in the rear portion of the lot. From aerial photographs taken at the time (1979-1980), and based upon the common practice in the area, it appears that the material from the “pit” was spread on-site to provide additional elevation for, and to minimize the potential for flooding of, the home and driveway that were constructed on the lot. Thus, the original “design function” of the “pit” was to provide fill for construction. The original owners thereafter allowed the “pit” to accumulate water and stocked it with fish so that Mr. Kassinger could use it recreationally as a fishing pond. The “design function” of the original “pit” was thus changed so that it would serve as a recreational amenity on the property. During the subsequent 14 years that the original owners lived in the home, they did nothing further to alter or improve the fishing pond. Over the years, the area immediately around the fishing pond became heavily vegetated and was used from time to time by various wild birds and animals. The fishing pond was used by the original owners for fishing and for observing the wildlife it attracted. After purchasing the home, Mr. Slusher also stocked the fishing pond with various fish over the years so that he and his family could continue to use it recreationally. The fishing pond continued to be used by the Slushers for fishing, for observing wildlife, and as a swimming area for their dogs. Currently, the overall dimensions of the fishing pond are approximately 90 feet wide, by 122 feet long, by 10 feet deep at its deepest part, when filled to the level that was natural prior to the operation of Water Well No. 10. Potable water for the Slusher home is obtained from a well drilled on the property, not from the public water system of the County. The Slusher well is located approximately 33 feet from the home. It is attached by PVC pipe to a pump located next to the home. The original owners caused the well to be drilled. The record in this case does not contain any persuasive evidence regarding the details of the Slusher residential water well. Specifically absent are such details as the depth to which the well was originally drilled, the material from which the well tube was made (i.e., cast iron or PVC), and the current physical condition of the sub-surface portions of the well. Mr. Slusher has not done anything to repair or replace the well since he and his wife purchased the home. On August 2, 2000, Mr. Slusher filed a petition with the SFWMD challenging the issuance of Water Well Construction Permit No. SF032696B, and the "use of the well." On November 3, 2000, Mr. Slusher filed an amended petition with the Division of Administrative Hearings, challenging the issuance of Water Use Permit No. 43-00752W and Water Well Construction Permit No. SF032696B. Martin County (“the County”) is a political subdivision of the State of Florida, established in 1925 pursuant to Section 7.43, Florida Statutes, and Section 1, Chapter 10180, Laws of Florida. SFWMD is an independent state agency, operating pursuant to Chapter 373, Florida Statutes. SFWMD originally issued Water Use Permit No. 43-00752W to the County on April 15, 1993. The “water use permit” was for wells and associated equipment at the Tropical Farms Water Treatment Plant (“Tropical Farms WTP”). SFWMD re-issued Water Use Permit No. 43-00752W to the County on March 14, 1996. The re-issued “water use permit” allowed additional wells to be drilled and additional draws of water by the County at the Tropical Farms WTP. One of the additional wells included in the re-issued water use permit was “Well No. 10.” SFWMD issued Water Well Construction Permit No. SF032696B to the County on March 28, 1996, allowing the construction of Well No. 10 at the Tropical Farms WTP. In accordance with the restrictions imposed by the water well construction permit, the County drilled Well No. 10 on a site located at least 100 feet in distance from the fishing pond on the Slushers’ property. The physical location of Well No. 10 is essentially “adjacent to” the Slusher property. County Well No. 10 is approximately 120 feet deep and draws water from the surficial aquifer. It commenced operation in December of 1996. It is uncontested that the operation of the well field, especially County Well No. 10, has caused drawdowns of the pond level and of the groundwater in the area of Mr. Slusher's residential water well. The MODFLOW model used by the County in support of its application indicates a maximum drawdown of 7.4 feet. The persuasive expert opinion evidence in this case indicates that maximum draw downs of 7 or 8 feet would be expected in the area of Mr. Slusher's residential water well. The County has acknowledged that the operation of Well No. 10 has had a significant effect on the drawdown of the water table in the area of the pond. County Well No. 10 appears to have been constructed in a manner consistent with the applicable rules. The well was properly drilled and grouted, the correct materials were used, and the well was constructed in a manner that did not result in harm to the water resources. The water use permit was issued prior to the well construction permit, as is appropriate. Although permitted originally in 1993 and again in 1996, the Tropical Farms WTP did not begin regular operations until June of 1997. It is now part of a consolidated system which includes four other water treatment plants, all operated by the County for the purpose of obtaining and providing potable water to the public county-wide. In support of its applications for the issuance and re-issuance of the water use permit, the County provided SFWMD with so-called “MODFLOW calculations” done by a professional engineering firm retained by the County. MODFLOW was developed by the U.S. Geologic Survey and is considered the standard for assessment of ground water resource impacts. The results of the three-dimensional MODFLOW modeling showed that the drawdown effect on the water table of the proposed wells for the Tropical Farms WTP would be unlikely to cause any adverse effect on typical wells used by homeowners, even if the latter were located within the same small “square” as one of the County’s wells. Prior to the commencement of the operation of Well No. 10 by the County, the water level in the fishing pond on the Slusher property would vary only a few inches up or down during the course of a typical year. After the County began to operate County Well No. 10, Mr. Slusher observed and videotaped much greater variations in the water level in the fishing pond on his property. After County Well No. 10 began to operate, the pond water level dropped to the extent that it would become virtually empty of water from time to time. At other times, however, the fishing pond would refill with water, such as in September of 1999, and in August of 2001. When the water in Mr. Slusher's pond gets very low, it has an adverse impact on the fish in the pond; the fish die because they have insufficient water. Mr. Slusher has not done anything over the years since the operation of County Well No. 10 began to attempt to prevent the variations in the water level of the fishing pond, or to mitigate the occurrence of such variations. The County (together with the rest of southern Florida) has experienced several periods of severe drought over the past few years. Yet other “ponds” on other properties in the same neighborhood as the Slusher property have not experienced the significant variance in water level that has occurred in the fishing pond on the Slusher property since the County began drawing water from Well No. 10. The County does not operate Well No. 10 continuously. Rather, it has attempted to reduce its use of the well. SFWMD has never issued any notice to the County that any mitigation was required on the Slusher property pursuant to the limiting conditions of the water use permit. The County does not dispute that its operation of Well No. 10 has contributed to a drawdown in the level of the water table in the surrounding area, nor that such a drawdown has contributed to the variance in the water level in the pond on the Slusher property. Indeed, the drawdown of the water table generally was fully anticipated and predicted in the materials submitted by the County to SFWMD. The use of County Well No. 10 to draw water from the surficial aquifer is not the only factor contributing to the variances in the water level of the fishing pond on the Slusher property. Evaporation and natural variances in the level of the water table also contribute to changes in the water level of the fishing pond. Bentonite is a naturally occurring clay that is mined for a variety of uses, including the “lining” or “waterproofing” of reservoirs, lagoons, ponds, ditches, and other man-made bodies of water in order to seal them and to prevent or minimize seepage or percolation of the water into the ground. Even repeated wetting and drying of the clay does not reduce its effectiveness. Bentonite is widely used and has not been found to have any harmful or toxic effects on either human beings or wildlife. In some applications, bentonite clay is a superior lining material when compared to a man-made liner, such as a plastic or polymer sheet. In a small scale application where the volume of water in a lined pond is relatively low, a man- made liner could be forced away (“balloon up”) from the bottom of the pond by the pressure of a rising natural water table. Lining the pond on the Slusher property with Bentonite (or some similar clay) would create a virtually impervious layer that would separate the water in the pond on the Slusher property from the surrounding water table. With such a lining in place, County Well No. 10 would have no significant effect on the water level of the pond. The water level in the pond on the Slusher property could also be stabilized at or near its normal level prior to the operation of County Well No. 10 by installation of a water supply that would add water to the pond whenever the pond dropped below a specified level. Mr. Slusher first complained to the County about the effect of the County’s operation of Well No. 10 in 1997, when he spoke with Jim Mercurio, a County water utilities employee. Mr. Slusher also complained at about the same time to SFWMD, which resulted in a “field investigation” in September 1997. At that time, Mr. Slusher complained about the lowering of the water level in the pond on his property, but specifically denied any adverse effect on the water from his residential water well. Mr. Slusher began to complain about the water quality and water pressure in his residential water well sometime in 2000. The water flowing from Mr. Slusher's residential water well now has an unpleasant odor, taste, and color, and the water causes rust stains. The water pressure of the water flowing from Mr. Slusher's residential water well is less than it was before the construction of County Well No. 10. The rust stains, odor, taste, and color are all due to iron oxidation of the water drawn from the well on the Slusher property. The County regularly experiences similar problems with iron oxidation in the water that it draws from its own wells in the same area as the Slusher property, which the County must treat at the Tropical Farms WTP. The problem of iron oxidation (and accompanying odor and taste deficiencies) in the water is thus not unique to the water drawn from the well on the Slusher property. Iron oxidation in well water is not harmful to human beings. The evidence in this case does not include any evidence of any testing of the water quality of the water coming from the Slusher residential well. Similarly, there is no persuasive evidence as to the current condition of the sub- surface portions of the Slusher residential well. Further, the evidence regarding the cause of any deterioration of the water quality and/or the water pressure of the Slusher residential water well is both anecdotal and speculative, and is not a persuasive basis for determining the cause of any deterioration of the water quality and/or water pressure of the subject residential well. Specifically, the evidence is insufficient to establish that the water quality and water pressure deterioration complained of by Mr. Slusher are a result of the operation of County Well No. 10. Such deterioration could be caused by other circumstances or conditions, including the uninspected sub-surface condition of Slusher's residential water well. The water quality and water pressure problems currently experienced by Mr. Slusher could be minimized or eliminated by connecting his residence to the residential water supply system operated by the County. A branch of the County's public water system already exists in Mr. Slusher's neighborhood within a few hundred feet of his property. The application and information provided to SFWMD by the County were determined by SFWMD to provide “reasonable assurances” that existing legal users would not be adversely affected by the proposed wells or water treatment facility.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is hereby recommended that the Governing Board of the South Florida Water Management District enter a final order issuing Water Well Construction Permit No. SF032696B and re- issuing Water Use Permit No. 43-00752W to Martin County, subject to the general and special conditions set forth therein. DONE AND ENTERED this 31st day of May, 2002, in Tallahassee, Leon County, Florida. MICHAEL M. PARRISH Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 31st day of May, 2002. COPIES FURNISHED: Howard K. Heims, Esquire Virginia P. Sherlock, Esquire Littman, Sherlock & Heims, P.A. 618 East Ocean Boulevard, Suite 5 Post Office Box 1197 Stuart, Florida 34995-1197 Douglas H. MacLaughlin, Esquire South Florida Water Management District 3301 Gun Club Road Post Office Box 24680 West Palm Beach, Florida 33416-4680 David A. Acton, Esquire Senior Assistant County Attorney Martin County Administrative Center 2401 Southeast Monterey Road Stuart, Florida 34996-3397 Frank R. Finch, Executive Director South Florida Water Management District Post Office Box 24680 West Palm Beach, Florida 33416-4680

Florida Laws (3) 120.569120.577.43
# 8
BOARD OF PROFESSIONAL ENGINEERS vs. JAMES A. TIPTON, 85-002684 (1985)
Division of Administrative Hearings, Florida Number: 85-002684 Latest Update: May 19, 1986

Findings Of Fact At all times material to this proceeding, Respondent, James A. Tipton ("Tipton"), has been a registered professional engineer in the State of Florida, having been issued license number PE 0018147, which expires on January 31, 1987. Tipton employed the services of Robert Corno as a field man for taking samples to establish soil profiles, site characteristics and existing water tables for septic tank applications prepared and filed by Tipton. Corno had actual authority from Tipton to conduct tests, site examinations and evaluations and to submit his findings to Tipton. Sometime before April 8, 1985, Tipton was retained to perform professional engineering services in connection with the preparation and filing of an application for a septic tank on lot 168, block 3, Charlotte Ranchettes Subdivision in Charlotte County ("lot 168"), owned by Joseph Duseo. Tipton sent Corno to lot 168 on April 13, 1985, to examine and evaluate the site, take soil samples and make other observations that would have to be reported to Tipton in connection with Tipton's work. Corno completed his work and reported to Tipton. Corno did not bring Tipton the actual soil samples. On April 8, 1985, Duseo's general contractor told Corno about a well on lot 168. When Corno visited the site, he observed the well. The well is an artesian well, about 3 feet high and six inches in diameter. The well is an irrigation-type well and is non-potable. The well was within fifty feet of the drain field of the septic system Tipton proposed for lot 168. The well also is approximately 5 to 10 feet from the north property line. Corno knew at the time of his visit to the site that the well was not plugged. However, Corno understood that Duseo was in the process of arranging with the Southwest Florida Water Management District to have the well plugged. Corno did not tell Tipton about the well before Tipton prepared and filed the application for the proposed septic tank. Therefore, Tipton did not know there was a well on lot 168 when he was preparing the application for the septic tank permit. Tipton did not ask Corno any questions calculated to reveal whether there was a well on lot 168. Corno held the belief that non-potable wells, especially those that were to be plugged, did not have to be shown on septic tank permit applications. There was evidence about a survey of lot 168 certified by a land surveyor employed by a firm of professional engineers which did not show any well on lot 168. However, Tipton did not have access to the survey before he prepared the septic tank permit application on lot 168. (The survey bears two dates, April 17 and April 18, and was not signed until April 25, 1985.) On or about April 15, 1985, Tipton signed and certified the septic tank permit application for lot 168. The application was filed at the Charlotte County Public Health Unit (Health Department) on April 16, 1985. The application indicates "none" in the space provided to indicate the "location of wells within 75 feet of property lines." The well on lot 168 is an important consideration which should have been depicted on the application. Septic tank drain fields could pollute a well. Even if Tipton had known that the well was supposed to be plugged, it was not plugged until July 1985. Failure to show the well was a serious omission. Tipton was negligent for relying on Corno without having an understanding whether Corno would report to him the existence of non-potable wells within 50 feet of the drain field of a septic system or within 75 feet of a property line if the well was likely to be plugged. If he had used due care, Tipton would have either made explicit inquiry of Corno sufficient to reveal the existence of the well or ascertained from Corno in advance that he would report to Tipton the existence of any well within 50 feet of the drain field of a proposed septic system or within 75 feet of property lines. Having failed to exercise due care, Tipton did not realize that Corno would not be reporting to him the existence of a non-potable well which was supposed to be plugged in the future. A few days after he filed the application, Tipton learned about the well on lot 168. But at about the same time, Duseo and his contractor began discussing construction alternatives that would change the septic system and require a new septic tank application. Therefore, Tipton did not immediately amend the April 15 application to show the well. In mid-May, Tipton filed a new application for the different septic system. The new application, not in issue in this case, showed the well. The application also contained a soil profile which probably is not accurate. However, Tipton's soil profile simply reflects the information reported to him by Corno. While Tipton's soil profile does not correspond with soil profiles from other test holes dug in the area of the proposed drain field by the Health Department and an expert witness, the information Corno reported to Tipton was well within the realm of possibilities for soil in the area of lot 168. Corno generally seemed to be a qualified and experienced field man who used proper tools to do his job. There was nothing suspicious about Corno's information, and there was no reason for Tipton to suspect that it was false or fraudulent. While it is the better practice for a professional engineer to require his field man to deliver the actual soil sample to support a soil profile report, this is not required of professional engineers if there is no reason to suspect that a field man's soil profile report is false or fraudulent. On the application, Tipton estimated the high water table on lot 168 at 2.2 feet below existing grade. While other expert witnesses estimated a higher high water table, the evidence did not prove that Tipton was negligent in his estimate. Some of the conflicting estimates were Health Department estimates which, the evidence indicates, tend to be high to be on the safe side. Others were estimates on permit applications which may have been influenced by the Health Department's desires and which may not reflect the engineers' actual estimates. Of all the estimates, only Tipton's was supported by testimony how the estimate was derived. (Tipton used what he called Darcy's Law.) Finally, Petitioner's own expert witness testified that Tipton's high water table estimate could not be called negligent.

Recommendation Based upon the foregoing Findings Of Fact and Conclusions Of Law, it is recommended that the Board of Professional Engineers enter a final order holding Respondent, James A. Tipton, guilty of negligence in the practice of engineering under Count I of the Amended Administrative Complaint (but dismissing Count II of the Amended Administrative Complaint) and imposing an administrative fine in the amount of five hundred dollars ($500.00). RECOMMENDED this 19th day of May, 1986, in Tallahassee, Leon County, Florida. J. LAWRENCE JOHNSTON Hearing Officer Division of Administrative Hearings 2009 Apalachee Parkway Tallahassee, Florida 32399 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 19th day of May, 1986. COPIES FURNISHED: Ms. Sarah Logan Executive Director Board of Professional Engineers 130 North Monroe Street Tallahassee, FL 32301 Mr. Fred Roche Secretary Department of Professional Regulation 130 North Monroe Street Tallahassee, FL 32301 Salvatore A. Carpino, Esq. General Counsel Department of Professional Regulation 130 North Monroe Street Tallahassee, FL 32301 Wings Slocum Benton, Esq. Department of Professional Regulation 130 North Monroe Street Tallahassee, FL 32301 John Charles Heekin, Esq. C-1 Ocean Plaza 21202 Ocean Blvd. Port Charlotte, FL 33952 APPENDIX The following are specific rulings on all the parties' proposed Findings of Fact as required by Section 120.59(2), Florida Statutes (1985). Rulings on Petitioner's Proposed Findings of Fact Petitioner's Proposed Findings of Fact 1 through 3, 9, 10, 13 through 16, 19, 21 and 22 are accepted as substantially factually accurate and are incorporated in the Findings Of Fact in the same or similar format to the extent necessary. Petitioner's Proposed Finding Of Fact 4 would have been included in paragraph 1 above except that the last sentence is unnecessary. Petitioner's Proposed Finding Of Fact 5 would have been included in paragraph 1 above except that the third sentence is unnecessary. Petitioner's Proposed Findings Of Fact 17, 18 and 27 would have been included in paragraph 1 above except that they are unnecessary. Petitioner's Proposed Finding Of Fact 26 would have been included in paragraph 1 above except that whether Alligator Creek is a "significant" drainage feature would depend on the definition of "significant" which was not established by the evidence. In addition, Petitioner's Proposed Finding Of Fact 26 is unnecessary. Petitioner's Proposed Findings Of Fact 6 through 8 are rejected as conclusions of law and because the last sentence of Proposed Finding Of Fact 6 is cumulative. Petitioner's Proposed Finding Of Fact 11 is rejected because the first sentence is contrary to the greater weight of the evidence and Findings Of Fact and the second sentence is, subordinate to Findings Of Fact. Petitioner's Proposed Findings Of Fact 12, 20, 23 and 24 are rejected as subordinate to Findings Of Fact. Petitioner's Proposed Finding Of Fact 25 is rejected because the first sentence is subordinate to Findings Of Fact and the second sentence is contrary to the greater weight of the evidence. Rulings on Respondent's Proposed Findings of Fact. Respondent's Proposed Findings Of Fact 1 through 3, 5 and 12 are accepted as substantially factually accurate and are incorporated in the Findings Of Fact in the same or similar format to the extent necessary. Respondent's Proposed Finding Of Fact 4 would have been included in paragraph 1 above except that the second sentence is unnecessary. Respondent's Proposed Finding Of Fact 8 would have been included in paragraph 1 above except that it is unnecessary. Respondent's Proposed Finding Of Fact 9 would have been included in paragraph 1 above except that it is in part unnecessary. Respondent's Proposed Finding Of Fact 11 would have been included in paragraph 1 above except that it is contrary to the greater weight of the evidence and Findings Of Fact that there is "no way" for an engineer to avoid relying on a field man's error such as Corno's error in omitting to report the existence of the well. Respondent's Proposed Finding Of Fact 14 would have been included in paragraph 1 above except that it is irrelevant. Respondent's Proposed Finding Of Fact 6 is rejected because it is subordinate to Findings Of Fact and is unnecessary. Respondent's Proposed Finding Of Fact 7 is rejected because it is simply a recitation of conflicting evidence, some of which is accepted but some of which is rejected as contrary to the greater weight of the evidence and Findings Of Fact. Specifically, it was found that Corno did not tell Tipton about the well and that Tipton did not have the survey in his possession at the time the application was filed. Respondent's Proposed Finding Of Fact 10 is rejected as contrary to the greater weight of the evidence and Findings Of Fact. Specifically, the evidence supported a finding of negligence on the part of Tipton for failure to utilize due care and to have due regard for acceptable standards of engineering principles whether or not practicing in Charlotte County. In addition, Mr. Murray's expert testimony must be disregarded because it was given upon a hypothetical assumption that an engineer had possession of a sealed survey showing no improvements on the property as the time of the application, a fact not proved by the evidence. Respondent's Proposed Finding Of Fact 13 is rejected as contrary to the greater weight of the evidence and Findings Of Fact. Specifically, personnel in the Health Department, part of the "general public," were misled. (The general public also reasonably could have been led to a fallacious conclusion, but there was no "misconduct" on Tipton's part. See Conclusions of Law.) ================================================================= AGENCY FINAL ORDER ================================================================= STATE OF FLORIDA DEPARTMENT OF PROFESSIONAL REGULATION BOARD OF PROFESSIONAL ENGINEERS DEPARTMENT OF PROFESSIONAL REGULATION, FLORIDA BOARD OF PROFESSIONAL ENGINEERS Petitioner, vs. DOAH CASE NO. 85-2684 DPR CASE NO.0058289 JAMES A. TIPTON, Respondent. /

Florida Laws (1) 471.033
# 9
JACQUELINE M. LANE vs INTERNATIONAL PAPER COMPANY AND DEPARTMENT OF ENVIRONMENTAL PROTECTION, 01-001490 (2001)
Division of Administrative Hearings, Florida Filed:Pensacola, Florida Apr. 18, 2001 Number: 01-001490 Latest Update: Nov. 30, 2001

The Issue The first issue is whether Petitioner, Jacqueline M. Lane (Lane) has standing. The second issue is whether International Paper Company (IP) provided reasonable assurances it has the ability to meet the conditions of the existing industrial wastewater permit for the wastewater treatment facility at the paper mill in Cantonment, Florida, pursuant to Rule 62- 620.340(3), Florida Administrative Code. A final issue is whether Lane litigated this matter for an improper purpose.

Findings Of Fact Based on the evidence and testimony of the witnesses presented and the entire record in this proceeding, the following facts are found: The Parties The Department is charged with the responsibility for determining whether to approve the Application for transfer of permit number FL0002562-002-IWF/MT from Champion to IP. IP is a corporation authorized to do business in the State of Florida. IP operates a bleach kraft fine paper mill in Cantonment, Florida, formerly operated by Champion. Lane is a citizen of the State of Florida who lives on Perdido Bay. Application for Transfer of Industrial Wastewater Permit Number FL0002526-002-IWF/MT In June 2000, IP notified the Department it was acquiring Champion as a wholly owned subsidiary. IP took over operation of the facility in Cantonment on January 1, 2001. At that time, the companies had fully merged. On January 19, 2001, IP timely submitted an Application for Transfer of a Wastewater Facility or Activity Permit (Application) and advised the Department that "the permittee name for the pulp and paper mill in Cantonment, Florida[,] has been changed from 'Champion International Corporation, Inc.' to 'International Paper Company.'" Several wastewater permit- related documents were submitted to the Department as part of this name change. The Department processed IP's Application to transfer the facility's permit pursuant to Rule 62-620.340(3), Florida Administrative Code. "The parties agree that this matter is controlled by Rules 62-4.120 and 62-620.340, F.A.C., regarding the transfer of the permit. The parties [did not agree] upon what conditions of the combined permits are applicable to determine whether the Department has received 'reasonable assurances that the conditions of the permit will be met.' Rule 62-620.340(3), F.A.C." Rule 62-620.340(3), Florida Administrative Code, provides: "The Department shall allow the transfer under subsection (2) of this section unless it determines that the proposed permittee cannot provide reasonable assurance that conditions of the permit will be met. The determination shall be limited solely to the ability of the proposed permittee to comply with the conditions of the existing permit, and it shall not consider the adequacy of these permit conditions." (Emphasis added). This proceeding does not involve an enforcement action or consideration of whether the wastewater permit, and related documents, should be renewed. Champion's renewal application is under consideration by the Department. The parties agree that the documents described in Findings of Fact 10-19, infra, set forth the conditions of the permit number FL0002526-002-IWF/MT at this time. These documents are listed below: November 15, 1995, DEP Order (combining the NPDES permit and the State- issued wastewater permit) April 22, 1996, DEP Letter (clarifying November 15, 1995, Order regarding 1983 NPDES Permit) January 3,1983, EPA NPDES Permit December 13, 1989, DER Temporary Operating Permit December 1, 1989, DER Consent Order December 12, 1989, DER Variance The Permit(s), Consent Order, Variances, and Related Permit Documents Before May 1, 1995, in order to operate the wastewater treatment facility at the mill in Cantonment, both state and federal permits were required. The Department or its predecessor agency, the Department of Environmental Regulation (DER), issued state permits pursuant to Sections 403.08 and 403.088, Florida Statutes, and applicable rules. The United States Environmental Protection Agency (EPA) issued federal National Pollutant Discharge Elimination System (NPDES) permits pursuant to 40 Code of Federal Regulation Section 124.15. As a result of EPA's delegation of its NPDES authority to the Department in 1995, only one permit is now required. The 1995 Memorandum of Agreement between EPA and the Department does not allow the Department to modify a permit that has been administratively continued. Modifications to permit limits have to be made through the permit renewal process. On or about January 3, 1983, the EPA issued a NPDES permit to St. Regis Paper Company, authorizing discharge from the facility, located at the paper mill in Cantonment to the receiving waters named Eleven Mile Creek (creek). This NPDES permit contains the federal permit conditions applicable at this time. (EPA has since used the facility as a benchmark model to develop effluent guidelines for its new cluster rule.) On December 1, 1989, the DER entered into a Consent Order with Champion International Corporation. This Consent Order was issued as a result of Recommended and Final Orders issued in Perdido Bay Environmental Association, Inc. et al. v. Champion International Corporation and Florida Department of Environmental Regulation, 12 F.A.L.R. 126 (DER Nov. 14, 1989). This Consent Order allowed the continued operation of the facility. As a compliance requirement, a study report was required to include "an evaluation of technologies and treatment alternatives . . . to determine the most environmentally sound and practicable means to correct identified water quality violations caused by Champion." The studies required by the Consent Order are needed to pinpoint sources of pollutants in the creek and Perdido Bay (bay). The Consent Order has no expiration date although it is tied to the temporary operating permit (TOP) which had an expiration date of December 1, 1994. Extensive studies have been submitted to the Department pursuant to paragraph 14.A. of the Consent Order, which are necessary to trigger "the final compliance plan." This has been an ongoing process since the Consent Order and TOP were issued. The conditions in the Consent Order and TOP apply at this time. Various discharge limitations and monitoring requirements are set forth in the TOP. On December 13, 1989, DER issued a TOP, Number IT17- 156163, to the facility, which was issued in conjunction with the Consent Order. The TOP expressly relies on the Consent Order for authorization. It contains the effective state permit conditions at this time. On December 8, 1989, DER issued a Variance from water quality standards for color (transparency), iron, zinc, and the general water quality criterion for specific conductance. The standards in the Variance are part of the TOP and are effective at this time. The mill no longer needs the Variance for iron and zinc. As to those parameters, it currently operates at lower levels than under the Variance. On November 15, 1995, the Department combined the state and federal operating permits into a single permit identified as Wastewater Permit Number FL0002526-002-IWF/MT. The TOP and NPDES permit were administratively continued when renewal applications were filed. The Department will transfer to IP the permit documents described in Finding of Fact 9, supra. The Department will also transfer the pending permit renewal applications filed by Champion. Wastewater Treatment Facility at the Paper Mill in Cantonment, Florida In the past, Champion owned and operated a 1400-ton per day bleach and kraft pulp and paper mill in Cantonment. The operation is now conducted by IP. The paper mill treats its effluent from industrial activities at an on-site wastewater treatment facility (facility). Stormwater that falls on the industrial portion of the mill is also processed through the facility. The mill is required to and takes monthly samples from the creek for a few parameters, e.g., DO and pH, to provide data to the Department for use in developing possible changes to effluent limitations in a final compliance plan. There is an installed structure that continuously measures the flow of the effluent at the end of the facility's treatment system. This point, i.e., where the flow is measured, is called the Parshall Flume which is the compliance point for the facility. The effluent at Parshall Flume is automatically sampled each day, analyzed, and reported on a monthly basis to the Department. The analyses are reviewed and compared to the effluent limitations for a particular permit. The treated effluent is discharged from the Parshall Flume through a pipe to natural wetlands. In this wetland area, the treated effluent combines with several streams, non- processed stormwater, and runoff from land south and west of the facility. Runoff from residential areas and areas west of the mill, including the City of Cantonment, also flows into this area. The IP mill is not the only source of discharge into this area. After passing through the natural wetlands, the treated effluent runs through a pipe that discharges into the creek from below the surface. This point is about a half-mile from the facility. It is called the "boil" because the water from the pipe boils up into the creek. The "boil" is not a compliance point. On occasion, a Department inspector has taken water samples at the boil. Each time, his sampling has shown water quality standards were met at the boil. At the boil, the water flowing into the creek from the pipe contains treated effluent and drainage from areas not associated with the mill. From the boil, the creek flows a distance of fourteen miles to Perdido Bay (the bay). At the boil, there is also stormwater runoff and drainage from residential areas flowing into the creek in addition to the water from the pipe. Along the sides of the creek to the bay is a large drainage basin, which includes agricultural and residential runoff that flows into the creek. The boil, which is non-processed stormwater of the creek, could be contaminated from non-IP sources. Sources of pollutants in the bay include residential and agricultural stormwater runoff, Perdido River, and the creek. The Escambia County Utility Authority (ECUA) also has a treatment plant that has a discharge into the bay. Saltwater intrusion and runoff from development are additional sources of pollutants in the bay. Lane takes samples at the boil and most recently in May and June of 2001. Her measurement of dissolved oxygen (DO) was approximately 2.6 and for specific conductance, between 1600 and 2000. Lane also samples the water at a bridge (279A) two miles down the creek from the boil. Lane testified regarding bacteriological quality at the boil or further down stream, that fecal coliforms, including the bacteria Klebsiella, were present. Lane is not a certified sampler. She does not have the required quality control/quality assurance program. Lane does not know the Department requirements to sample dissolved oxygen. She could not describe an approved standard for such sampling. Surface Water Quality Standards Unless otherwise provided through relief mechanisms, discharges into surface waters must meet the minimum water quality standards set forth in Rules 62-302, Florida Administrative Code. Relief mechanisms include variances, consent orders, and temporary operating permits. The Department has issued variances, consent orders, and temporary operating permits to allow permit holders time to respond to changes in water quality standards and related regulations that reflect changes in understanding of environmental impacts to water bodies. Permit Conditions The permit conditions do not require compliance with all the water quality criteria in Chapter 62-302, Florida Administrative Code, for water quality parameters. The Department has not yet agreed on "final treatment solutions" it can require under the Consent Order. See, e.g., Finding of Fact 49. Specific deviations from the surface water quality standards in Chapter 62-302, Florida Administrative Code, are authorized by the Consent Order, TOP, variance, and NPDES permit. The specific effluent discharge limitations in the TOP and NPDES permit, are for BOD5, TSS, iron, specific conductance, pH, and zinc. (The reference to condition 12 in paragraph 25 of the TOP has not been amended.) Several of the effluent limitations (e.g., specific conductance) were granted by the Variance. Paragraph 26 of the TOP specifies the monitoring and frequency requirements for the monitoring at the Parshall Flume. This monitoring information can be used by the Department to pinpoint sources of pollutants in the creek and in order to establish numerical, water-quality based effluent limitations for those sources. General Condition 5 of the TOP does not per se impose on the mill the duty to meet all water quality standards in Chapter 62-302, Florida Administrative Code. The TOP authorizes "a certain amount of pollution" and "certain relief." The TOP further established a "compliance schedule" for Champion to study the impacts of the discharge. However, the Department rules allow for reopening of the TOP and changing the permit conditions to reflect new evidence causing a concern regarding pollution. Here, the Department has not reopened the TOP. The permit, including the TOP and Consent Order, allows the mill a period of time to come into compliance with all minimum water quality standards. When a final permit is eventually issued, the facility will have to meet these standards absent some express relief mechanism at that time. IP Provided Reasonable Assurances of Its Ability to Meet Permit Conditions The Department employee who reviewed IP's Application to transfer the permit is an expert in environmental engineering. At the time he reviewed the Application, he was familiar with the existing permit conditions. As part of his review, he ascertained whether IP was satisfying the conditions of the permit and determined it was. The Department reviewed IP's annual report and other corporate brochures as part of its processing of the transfer Application. Information in these documents revealed IP has obtained other Federal-type NPDES permits for other companies at several other facilities. The Department was familiar with IP's local management at the Cantonment facility when it processed the transfer Application. IP brings considerable "capability and talent" to the mill. The Department performed inspections during the last six (6) months and was familiar with the facility and wastewater system. IP is an international company with greater financial resources than Champion. It has approximately $30 billion in annual sales. Champion, in comparison, generated about $5 billion a year. It is clear that that the operation of the mill and the facility would have less capital and financial support without IP. Since June 2000, IP has worked with the Department in a continuation of the Department's concept of relocating the facility's discharge to wetlands. The plan considers removal of the facility's treated effluent from the creek to wetlands on IP's land and effectively eliminates it as a point source discharge and removes the discharge from the creek. IP will have a greater ability than Champion to meet permit conditions due to greater financial sources, technical staff, and resources. IP's management is committed to resolving water quality issues like specific conductance and is willing to resolve outstanding water quality issues in the bay and creek. In the view of the former Northwest District Director who worked on water quality issues at the facility for twelve years ending March 31, 2001, the current plan to discharge to wetlands will be implemented and allow compliance with all water quality standards. He also opines that IP has the ability to comply with water quality standards under the plan to discharge to wetlands. In the Department's view, IP has provided reasonable assurances that it has the ability to meet the existing conditions of the permit sought to be transferred. IP Complies with Permit Conditions as Evidence of Ability According to the Department's expert, Mr. William A. Evans, a professional engineer with a Master's degree in civil engineering and an expert in environmental engineering, there have been no verifiable violations of permit conditions and no exceedances since January 2000, before IP took over operations of the mill. On the other hand, Mr. Evans, in reviewing a discharge monitoring report for IP for April 2001, advised, during cross-examination, that there appeared to be "an apparent violation, exceedance of the permit" for specific conductance pursuant to the 1500 micromhons per centimeter limit in the EPA's version of the permit. However, the Variance, which is part of the Application, was granted "because there is no practicable means known or available for the adequate control of the pollution involved," i.e., specific conductance. The Department applies the limit of 2500 micromhos per centimeter set forth in the Variance for specific conductance, which is a reasonable interpretation of the permit documents. When the permit documents, including the Variance are read in this light, IP is in compliance with this limit. IP is in compliance with the Consent Order, NPDES permit, and Variance. In making this finding, the undersigned is mindful of Lane's arguments and facts presented. The issue here is not black or white; violation or no violation. As noted by Mr. Evans: This permit is recognized since '89 is [sic] not meeting water quality standards. It has all these documents because it doesn't. And they're still working under those. And the Department agrees with Ms. Lane that they are not meeting water quality standards in the creek. And we're working under these documents to make improvements. And so is Champion and so is IP. But they are not, in our opinion, violating the conditions of the permit. There [sic] are complying with studying it, meeting the interim limits that are set forth in the permit. And that is what the Statutes require when a facility can not meet all the standards of a permit. The Department, while considering the renewal application, has not approved it yet because they have not received reasonable assurances that new permit conditions can be met. Champion, and now IP, are facing the continuing challenge of satisfying, among other requirements, water quality standards, which takes time, money, and know-how. The Department rightly believes that IP can best meet this challenge. The Department's review of the monthly monitoring reports submitted by the mill since Champion was purchased reveals the facility has complied with permit conditions. The most recent monthly report was submitted May 23, 2001, and includes data through April 2001. During inspections at the facility since June 2000, the Department found no violations of permit conditions. The mill, under IP's operation, has not exceeded the fecal coliform conditions of its permit. The mill has no significant contribution to fecal coliform in the creek because it treats its own domestic sewage and meets the fecal coliform limit at the compliance point. Runoff along the creek from agricultural and domestic sources could contribute to fecal and total coliform in the creek. The Department enforces the "more stringent" pH condition in the 1989 TOP and Variance which is controlling over the less stringent standard in the 1983 NPDES permit. The pH limit in the NPDES permit is 6.0-9.0. The Department reasonably interprets the freshwater stream pH rule to mean enforcement is not required if the permittee meets the range in the rule (6.0-8.5), more stringent than the 9.0 limit in the NPDES permit. The facility's pH data satisfies this range. If the Department were to enforce a limit of 6.5, instead of 8.5, IP has the ability to meet the lower limit by installing one of several available technologies to control the pH levels. IP's current proposal includes one of these technologies. The biological integrity provision in the Consent Order requires studies on biological components of the creek and pH impacts this condition. Permit Conditions Affecting the Creek and Bay The permit does not require the facility to meet all the minimum surface water quality standards of Chapter 62-302, Florida Administrative Code, in the creek and bay. That is because of the relief mechanisms in the Consent Order, TOP, NPDES permit, and Variance. The Consent Order provides a time frame for the facility to come into compliance with water quality standards in the creek and bay. In terms of the Consent Order, the Department considers IP to be at the paragraph 14.A. step of the compliance schedule since the Department has not yet "resolved or agreed on the final corrective action required under this [C]onsent [O]rder." The Department considers the facility to be in compliance with permit conditions because it is "working under a complying [sic] schedule and an order or a temporary operating permit." See Finding of Fact 49. As long as IP is meeting the "interim limits that are set forth in the permit," it is not violating conditions of the permit. The Department is aware of water quality exceedances from the standards in the creek and bay caused by the mill. This data was reported in the "fifth year surveys." This information serves as a basis for making improvements and finding "a new solution for the effluent as required by the consent order." See Finding of Fact 49. Proposal for Joint Project with ECUA IP and the ECUA are working with the Department on a plan than would result in the discharge of IP's treated effluent to wetlands, thereby removing the effluent from the creek. IP's financial capability, size, and technical human resources make this plan feasible. IP will propose a plan to satisfy the Consent Order which consists of three parts: upgrading IP's industrial wastewater treatment facility; allowing ECUA to locate an advanced domestic wastewater treatment plant on its land; and disposing the treated effluent from both facilities to wetlands on IP's land through a pipeline. The proposed plan to discharge the facility's treated effluent to wetlands is a suitable solution that will allow the mill to meet minimum water quality standards. Lane has no objection to the plan to discharge to wetlands. It will resolve all her water quality issues. She believes the plan, similar to a prior plan, is "feasible." Standing and Improper Purpose Lane admits the Department is not making any changes to existing permit conditions before transferring it to IP. Lane agrees that changing the name on the permit from Champion to IP has no adverse affect on her. Lane brought this proceeding because she is dissatisfied with the manner in which the Department is enforcing conditions in the facility's permit. According to Lane, "They haven't done their duty." Her main complaints are with the Department's failure to enforce the permit conditions and the lack of a permit that makes the permit holder comply with Florida law. Lane feels that Champion violated permit conditions in the past, and IP is currently violating permit conditions and, as a result, the permit should not be transferred because a decision to transfer is an implicit finding of compliance. In this light, Lane argues that past performance can be an indication of future ability or lack thereof. Lane acknowledges that in order to add conditions to the existing permit, the Department must provide notice to the mill and give it a chance to meet the proposed conditions. She further admits the Department has not provided such notice. Lane proved that the environmental situation attending Champion's, and now IP's, operation of the mill and the wastewater facility has been and is less than optimum and in need of positive changes. The Department agrees and so does IP. Lane's personal observations of the condition of the creek and bay are documented. However, Lane did not prove that she will suffer an "injury in fact" if the permit and related documents are transferred to IP. Lane is not otherwise substantially affected by the Department's decision to approve the transfer. Lane's evidence did not rebut IP and the Department's proof that IP has the ability to comply with the permit conditions. The preponderance of the evidence shows that the environment in and around the mill and the facility has a better opportunity for improvement if IP takes control of the mill and facility. On the other hand, based on this record, Lane did not bring this case for an improper purpose.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is recommended that a final order be rendered as follows: Lane lacks standing to challenge the transfer of industrial wastewater permit number FL0002526-002-IWF/MT to IP because Lane did not prove that her substantial interests were being determined by the Department's transfer of the permit from Champion to IP; IP provided reasonable assurances it has the ability to comply with the conditions of industrial wastewater permit number FL0002526-002-IWF/MT; IP has complied with the conditions of industrial wastewater permit number FL0002526-002-IWF/MT, as the Department construes those conditions, since assuming control of the mill on January 1, 2001; and Lane did not participate in this administrative proceeding for an improper purpose. DONE AND ENTERED this 24th day of August, 2001, in Tallahassee, Leon County, Florida. CHARLES A. STAMPELOS Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 24th day of August, 2001. COPIES FURNISHED: Jacqueline M. Lane 10738 Lillian Highway Pensacola, Florida 32506 Terry Cole, Esquire Patricia A. Renovitch, Esquire Oertel, Hoffman, Fernandez & Cole, P.A. Post Office Box 1110 301 S. Bronough Street, Fifth Floor Tallahassee, Florida 32302-1110 Craig D. Varn, Esquire Department of Environmental Protection 3900 Commonwealth Boulevard Mail Station 35 Tallahassee, Florida 32399-3000 Kathy C. Carter, Agency Clerk Office of General Counsel Department of Environmental Protection 3900 Commonwealth Boulevard, Mail Station 35 Tallahassee, Florida 32399-3000 Teri L. Donaldson, General Counsel Department of Environmental Protection 3900 Commonwealth Boulevard, Mail Station 35 Tallahassee, Florida 32399-3000 David B. Struhs, Secretary Department of Environmental Protection 3900 Commonwealth Boulevard The Douglas Building Tallahassee, Florida 32399-3000

Florida Laws (6) 120.569120.57120.595403.061403.088403.0885 Florida Administrative Code (3) 62-302.53062-4.12062-620.340