The Issue The issues presented are whether two separate sales of unregistered securities to elderly persons demonstrate a lack of fitness or trustworthiness to engage in the business of insurance in violation of Section 626.611(7), Florida Statutes (2001); and, if so, what penalty, if any, should Petitioner impose against Respondent's license. (All chapter and section references are to Florida Statutes (2001) unless otherwise stated.)
Findings Of Fact Respondent is currently licensed in this state as an insurance agent pursuant to license number A124652. The license authorizes Respondent to perform the duties of an agent for health and life insurance and variable annuity agent. Respondent is not licensed to sell securities. Petitioner is the state agency responsible for regulating the business of insurance in this state. Petitioner is not authorized to regulate the sale of securities. On September 18, 1998, Respondent sold eight shares of unregistered securities in Palm Beach Investment Group, Inc. (Palm Beach) to Mr. and Mrs. Anthony and Lucille Fusco (Fusco) for $40,000. On January 5, 1998, Respondent sold 18 shares of unregistered securities in Palm Beach to Mrs. Gladys Speth (Speth) for $90,000. The Department of Banking has jurisdiction over the sale of unregistered securities by unlicensed individuals. The Department of Banking disciplined Respondent for the sales of unregistered securities to Fusco and Speth. On November 10, l999, Respondent and the Department of Banking entered into a Settlement Stipulation and Final Order whereby Respondent admitted he violated Sections 517.07 and 517.12 by offering for sale or selling unregistered securities while he himself was not authorized to sell securities. Respondent did not dispute these facts at the administrative hearing of this case. The Administrative Complaint alleges that Respondent violated Sections 626.611(7)(9)(13), 626.621(2)(3) and (6), and 626.9541(1)(e)1 when he sold unregistered securities to Fusco and Speth. In Petitioner's PRO, however, Petitioner admits that Respondent could not have violated any statute other than Section 626.611(7) because Respondent did not engage in the business of insurance when he sold securities to Fusco and Speth. In relevant part, Petitioner states: Petitioner concedes that the alleged conduct does not involve insurance transactions and therefore cannot be considered transactions under Respondents [sic] insurance licenses. As a result, no violation of the other enumerated statutes has occurred. Petitioner's PRO at 11, paragraph 5. The only remaining issue that Petitioner asserts is whether Respondent violated Section 626.611(7). A licensee violates Section 626.611(7) if he or she demonstrates a lack of fitness or trustworthiness to engage in the business of insurance. Petitioner asserts that Respondent violated Section 626.611(7) by engaging in a business other than the business of insurance in a manner that demonstrates a lack of fitness or trustworthiness to engage in the business of insurance. Neither Fusco nor Speth are experienced investors. Neither buys or sells stock or securities and neither has any training or education in investing. Mr. and Mrs. Fusco are retirees, as is Speth. Fusco invested $40,000 of their life savings, and Speth invested $90,000 from a personal injury settlement. Mrs. Fusco had never purchased shares of stock before. Her father had lost a great deal of money in the l929 market crash and there was a long-standing family prejudice against stock. Fusco had business experience with Respondent prior to the time that Respondent sold Palm Beach securities to Fusco. That prior experience is relevant to the perspective and understanding that Fusco brought to the Palm Beach transaction. Sometime in l998, while Respondent worked with a previous employer, Respondent solicited Fusco to invest funds in a Certificate of Deposit (CD). Fusco did so and believed they were completing a similar transaction when they later purchased Palm Beach securities from Respondent. After Respondent sold the CD to Fusco, but still in l998, Respondent changed his employment to Evergreen National (Evergreen). Respondent telephoned Fusco and informed them that he had moved to Evergreen and that he was selling a very good security that they might be interested in purchasing. Mrs. Fusco explained to Respondent that they were not interested in securities, but they would be interested in purchasing a CD similar to the one they had previously purchased from Respondent. Fusco made an appointment to visit Respondent at his office. At Respondent's office, Mrs. Fusco stated unequivocally that Fusco desired to purchase only a CD. Fusco wanted no risk to their funds, and they made that clear to Respondent. Respondent represented to Fusco that Respondent was selling a CD that was fully guaranteed and insured against any loss. Respondent represented that Fusco would be investing in a proportionate share of a jumbo CD issued by Palm Beach, that they would enjoy a 14 percent return on their investment, and that their investment was insured by the Federal Deposit Insurance Corporation (FDIC) and the Great American Insurance Company (Great American). Respondent provided Fusco with various brochures about the investment that verified Respondent's representations that the investment was an insured, safe way to earn a high interest rate. Fusco relied on the representations contained in those brochures and those made by Respondent. Fusco was still somewhat hesitant to invest their funds. Respondent then brought into his office Darrin Carlson, the president of Evergreen (Carlson). Carlson reiterated to Fusco that the investment was insured and was completely safe and without risk. Fusco elected to invest $40,000 to purchase a CD. They gave a check to Respondent, and Respondent promptly remitted the check to Palm Beach. On September 18, 1998, Fusco signed a document entitled Subscription Agreement. The terms of the Subscription Agreement state that it is an application for Fusco to purchase shares of stock in Palm Beach. The agreement is clearly not an application to purchase a CD. In fact, no reference is made in the document to any CD or to Fusco's $40,000. Fusco did not understand the terms of the Subscription Agreement. Respondent did not explain the terms of the agreement to them. Fusco relied on the representations made by Respondent. Approximately three weeks later, Fusco received a stock certificate in the mail issued by Palm Beach showing that they owned eight shares of stock in Palm Beach. The certificate makes no reference to any CD or Fusco's $40,000 investment. Fusco was confused and upset. The stock certificate does not document that the Fusco's owned any CD or any share in a CD. Furthermore, Respondent offered no evidence of the use of the funds by Palm Beach. Fusco contacted Respondent. Respondent assured Fusco that this was the "way things were done," and their investment was safe. Fusco trusted Respondent and relied on the representation by Respondent. In May of l999, Fusco received a letter from Palm Beach informing Fusco that they would receive a full refund of their money plus interest as of June 7, l999. Palm Beach did not deliver on its promise. When Fusco did not receive any money from Palm Beach, Fusco contacted Respondent. Respondent assured Fusco that their investment as safe, that they were insured, and that they would soon receive their money. Fusco has never received the original $40,000 or any interest payment from Palm Beach. Palm Beach has never provided an accounting to Fusco showing the value of their investment. Fusco has suffered a loss of $40,000 plus accumulated interest at a fair market value rate. Respondent also sold unregistered securities to Speth. Sometime in January l999, Respondent visited the home of Speth. Speth had recently received $90,000 as a personal injury settlement and was looking for a secure investment. Speth wanted a risk-free investment. She told Respondent that she would purchase a CD, but had no interest in purchasing stock. Respondent suggested that Speth invest in a proportionate share of a jumbo CD to be issued by Palm Beach that would yield a 14 percent return. Respondent represented that the CD would be insured and risk free. Respondent showed Speth various brochures claiming that the investment was fully insured by the FDIC as well as other insurance companies. Respondent did not inform Speth that there was a risk she could lose her entire investment. Speth gave Respondent a check for $90,000 made out to Palm Beach to invest in a CD with a one-year maturity date. Speth subsequently received a stock certificate in the mail from Palm Beach showing that she owned 18 shares of Palm Beach stock. Speth was puzzled, telephoned Respondent, and told him that she thought she had purchased a CD. Respondent represented to Speth that her money was safe and fully insured. Speth has not received either her original investment or any interest on that investment. Palm Beach has not provided Speth with an accounting showing the value of her investment. Speth has suffered a loss of $90,000 plus accumulated interest at a fair market value rate. Respondent sold investments to Fusco and Speth that were not appropriate for their age, skill, and investment objectives. Both Fusco and Speth clearly expressed the maximum aversion to risk. Neither Fusco nor Speth would have invested in Palm Beach if they knew they were investing in stock. Both Fusco and Speth intended to purchase a CD or a proportionate share of a CD that was insured by the FDIC and Great American. At no time were their investments insured by the FDIC or any insurance company. Respondent had actual knowledge of the investment goals and skill of Fusco and Speth. Respondent believed that he was selling an investment vehicle that was appropriate to the knowledge, skill, and goals of Fusco and Speth. Prior to selling any securities in Palm Beach, Respondent undertook several independent inquiries that are fairly characterized as a form of due diligence. Some of Respondent's efforts toward due diligence are relevant to the unauthorized sale of unregistered securities. Other efforts are relevant to the nature of the investment as a secured investment. Palm Beach represented in a letter to Respondent that the securities offered for sale were exempt from registration. Carlson believed the securities were exempt and assured Respondent that Respondent did not need a license to sell the securities. Carlson went on-line to the web site of the Securities and Exchange Commission (SEC) and obtained a letter from private securities attorneys stating that the securities were exempt. Carlson believed that the securities were insured by Great American and obtained a copy of a financial institution bond with a limit of $5 million. Carlson represented to Respondent that any investment in Palm Beach securities was an insured investment. Respondent thought that he had verified the matter by telephoning the office of Great American and obtaining verbal assurances that the Palm Beach investment was insured. Respondent had a good faith belief that the securities he offered to Fusco and Speth, in part, were appropriate to the clients' investment goals because Respondent believed the securities satisfied the risk aversion expressed by Fusco and Speth. Respondent believed the securities were risk-free because he believed they were insured. Respondent knew the Palm Beach securities he offered to Fusco and Speth, in part, were not appropriate to the clients' investment goals because the securities were stock in a company and that neither Fusco nor Speth wanted to invest in securities. The first paragraph of the Securities Agreement clearly states that the investor is purchasing stock in Palm Beach. Respondent had actual knowledge that he was selling securities to Fusco and Speth and that neither wanted to purchase securities. Respondent has demonstrated in two separate transactions a willingness to sell a product to a person that the person did not desire to purchase. Even though the products sold were securities, rather than insurance, and even though Respondent believed the products represented the risk- free investment sought by Fusco and Speth, the willingness to sell securities to persons who have expressly stated that they do not want to purchase that type of product demonstrates a lack of fitness or trustworthiness to engage in the business of insurance within the meaning of Section 626.611(7). Respondent sold a product to Fusco and Speth that, in fact, was not risk-free. Respondent's due diligence prior to the sale did not include an independent attempt to ascertain whether Palm Beach in fact purchased a jumbo CD with the investments made by Fusco and Speth. Respondent did not disclose his omission to Fusco or Speth. After Respondent entered into a stipulation and final order with the Department of Banking, Respondent continued to represent to Fusco and Speth that their money was safe and that they would receive their money. Respondent has no prior discipline against his insurance license.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that Petitioner enter a Final Order finding Respondent guilty of violating Section 626.611(7) and suspending Respondent's license for nine months. DONE AND ENTERED this 25th day of October, 2002, in Tallahassee, Leon County, Florida. ___________________________________ DANIEL MANRY Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 25th day of October, 2002. COPIES FURNISHED: Elihu H. Berman, Esquire 509 South Greenwood Avenue Post Office Box 6801 Clearwater, Florida 33758 James A. Bossart, Esquire Division of Legal Services Department of Insurance 200 East Gaines Street, Room 612 Tallahassee, Florida 32399-0333 Honorable Tom Gallagher State Treasurer/Insurance Commissioner Department of Insurance The Capitol, Plaza Level 02 Tallahassee, Florida 32399-0300 Mark Casteel, General Counsel Department of Insurance The Capitol, Lower Level 26 Tallahassee, Florida 32399-0307
Findings Of Fact Based upon my observation of the witnesses and their demeanor while testifying, documentary evidence received and the entire record compiled herein, I hereby make the following relevant factual findings. Respondent is a certified general contractor and has been issued license number CG CA03134. During November of 1978, Respondent, doing business through the entity of Creative Home Design, Inc., entered into a contract with Dr. Stephen Silverstein to construct a residence in Boca Raton, Florida, for the sum of $180,000. Respondent received from Dr. Silverstein a total of $140,500 for the construction he performed on the Silverstein residence. (Stipulation by the parties) Additionally, Dr. Silvertstein paid certain liens which were filed with regard to the construction performed by Respondent on his residence, to wit: P.N.A. Drywall: $5,260.00 (Petitioner's Exhibit 2) Pentagon Diversified: $3,801.34 (Petitioner's Exhibit 3) American Lumber: $8,217.50 (Petitioner's Exhibit 4) Lone Star Industries, (Petitioner's Exhibits 7 and 8) Inc. $1,293.50 Mack Industries: $4,604.29 (Petitioner's Exhibits 9 and 10) Smith and DeShield: $ 600.00 (Petitioner's Exhibit 11) Certain contractors furnishing labor and materials for the Silverstein residence based on contracts entered into by wit: Respondent also filed liens, to A. A. Marini Septic Tanks, Inc.: (Petitioner's Exhibit 21) $1,700.00 Delano Pools, Inc.: (Petitioner's Exhibit 20) $4,539.00 William D. Adeimy, Inc.: 3/ (Petitioner's Exhibit 16) $3,183.75 Climate Control Services: (Petitioner's Exhibit 17) $1,882.50 Ballavia Construction (Petitioner's Exhibit Company: 24) $5,446.00 Temperature Control: (Petitioner's Exhibit 18) $ 678.00 J. Griffin Painting: (Petitioner's Exhibit 23) $3,795.00 Central Systems, Inc.: $1,018.80 (Petitioner's Exhibit 19) Dr. Silverstein also entered into another contract for the sale of the residence being built by the Respondent whereby Dr. Silverstein agreed to sell the residence to Respondent's son, Joseph Roberts, for the sum of $210,000. (TR pages 5-6) On February 15, 1980, a notice of code violation was issued by the building official for Palm Beach County, Florida stating that the pool which was installed at the Silverstein residence was not completely enclosed by a fence or dense hedge as required by Section 500.14F of the Palm Beach Zoning Code. Respondent has failed to correct that violation. Respondent completed the Silverstein residence to a degree of completion where it could be occupied and he could move into the residence with his family. Thereafter, Dr. Silverstein eventually filed suit and was awarded a judgment evicting Respondent from the residence. (Petitioner's Exhibit 12) Respondent's son, Joseph, failed to consummate the agreement to purchase the residence. Respondent and his family vacated the Silverstein residence and, in the process, removed certain fixtures attached to the residence including carpeting, appliances, door knobs, air conditioning and air handlers, the sprinkler system, light fixtures, vanities, a whirlpool tub, washer, dryer, air conditioning vents, bidet, sprinkling pump timer, and a drop-in range. (TR pages 23-28, 128- 130, and 98-100) Dr. Silverstein filed a claim of loss with his insurance company and was paid a settlement for the loss, which included the certain charges for reinstallation and the reconnection of the various fixtures which had been removed for a total sum of $24,252.02. (Petitioner's Exhibit 13, TR 25-28) The Respondent's Position Respondent contended that he was authorized to occupy the Silverstein residence and this contention is not really in dispute herein. However, it later became necessary for Dr. Silverstein to evict the Respondent and his family from the residence when it became apparent that his son, Joseph Roberts, would not consummate the agreement to purchase the residence of Dr. Silverstein. Respondent admits to taking the fixtures and other items referred to hereinabove. Respondent was without authority to do so. Respondent contends that the various liens which were referred to hereinabove were not valid inasmuch as more than one year had elapsed during the time the work was performed and no claim of lien had been filed within that one- year period. Thus, Respondent contends the claims of lien were defective. Respondent offered no proof of payment of the various claims of lien. Additionally, Respondent states that several of the contractors did not perform work and therefore there were no amounts due and owing those companies. Specifically, Respondent contends that Marini Septic Tank did not install the septic tank but a former affiliate did and that there was an attempt to bill him twice. Additionally, Respondent contends that he paid Ballavia Construction Company for the amount claimed in cash, however he had no receipts or other documentary evidence to substantiate that transaction. As relates to the claim of Griffin Painting, Respondent contends that he paid all amounts due and owing them save $660.00. Respondent failed to introduce evidence to corroborate his claim in that regard and it is therefore rejected. Finally, Respondent furnished releases of liens and an invoice of the claim referred to hereinabove from Climate Control Services, Inc. indicating that they were paid in full. Documentary evidence received and testimony introduced herein substantiates Respondent's position and it is found that he, in fact, paid Climate Control Services, Inc. in full for the services they rendered. (Respondent's Exhibits, 4, 6, and 10) As noted hereinabove, it is found that the Respondent paid the amount due and owing William D. Adeimy, Inc., and a release of lien from that entity was received herein. (Respondent's Exhibit 3)
Recommendation Based on the foregoing findings of fact and conclusions of law, it is hereby RECOMMENDED that the Respondent's certified general contractor's license number CG CA03134 be revoked. RECOMMENDED this 24th day of May, 1985, in Tallahassee, Florida. JAMES E. BRADWELL Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 24th day of May, 1985.
The Issue The issue to be determined in this case is whether two amendments to the Sunny Isles Beach Comprehensive Plan (Comp Plan), adopted by Ordinance Nos. 2019-549 and 2019-550 (Plan Amendments) on December 19, 2019, are "in compliance," as that term is defined in section 163.3184(1)(b), Florida Statutes.
Findings Of Fact The following Findings of Fact are based on the stipulations of the parties and the evidence adduced at the final hearing. The Parties Petitioner resides and owns property within the City. Petitioner provided oral comments and objections to the City during the period beginning with the transmittal hearing for the Plan Amendments and ending with the adoption of the same. The City is a Florida municipal corporation with the authority to adopt and amend a comprehensive plan, pursuant to section 163.3167. Land Use Designations The City was incorporated in 1997. In 2000, the City adopted its initial Comp Plan. As part of the initial Comp Plan, the City established the Town Center Planned Development District (Town Center) as an overlay area, which did not establish any densities or intensities. However, the Town Center overlay did contain underlying land use designations for the area as set forth in Policy 14A and 14B of the Comp Plan, which had established densities and intensities. The Mixed-Use Business land use category established a base density of 25 dwelling units per acre (du/acre), with a maximum density of 85 du/acre with density bonuses. Intensity was limited to a maximum of 2.0 floor area ratio (FAR). Community Facilities land use category established a maximum density of 25 du/acre, with the intensity limited to a maximum 2.0 FAR. Recreation Open Space land use category does not allow for development; therefore, there is zero density and intensity. In addition to the densities and intensities permitted for the identified land use categories, pursuant to Policy 14C of the Comp Plan, locations within the Town Center were designated as receiver districts for Transferable Development Rights (TDRs). Specifically, subparagraph (c) of Policy 14C established the limits on the use of TDRs by providing that: In no case […] shall the density or intensity on a receiver site exceed thirty (30) percent increase in the maximum permitted by the land use category limitations set in Policy 15B . . . and . . . in no case shall the resulting density bonus increases on any given receiver site exceed the number of dwelling units attainable on the sender site(s) under [comprehensive plan] provisions so as to assure NO net increase in city-wide residential dwelling unit Comprehensive Plan capacities occurs. Policy 14B of the Comp Plan set forth the Town Center's goals and objectives, including: The Town Center is encouraged to become the hub for future urban development intensifications around which a more compact and efficient urban structure will evolve. The Town Center is intended to be a moderate to high intensity design-unified area which will contain a concentration of different urban functions integrated both horizontally and vertically. The center will be characterized by physical cohesiveness, direct accessibility by mass transit services and high quality urban design. The Town Center is located to have direct connections to the 167th Street Causeway and Collins Avenue to ensure a high level of accessibility to the northeast Miami-Dade/bi-county area. Background In 2004, the City established the Town Center Zoning District in its Land Development Regulations (LDRs), which provided a maximum FAR of 5.2, and a maximum density of 75 du/acre. The intensity in the LDRs, as reflected by the FAR, exceeded the amount in the Comp Plan. However, the density in the LDRs was less than what was allowed in the Comp Plan. In 2007, the City proposed a comprehensive plan amendment that would have assigned density and intensity to the Town Center Planned Development District in its entirety. The state land planning agency objected to the proposed plan amendment in part because of a lack of data and analysis related to concurrency, emergency services, and hurricane evacuation routes. Beginning in 2005, the City approved a number of site plans for various development projects in the southern portion of the Town Center with underlying Mixed-Use Business land use designations. At that time, the City reviewed those developments solely for compliance with the City's LDRs for the Town Center Zoning District and without consideration of the maximum density and intensity allowable for the underlying land uses in the Comp Plan. As a result, all the approved projects in the southern portion of the Town Center with an underlying land use of Mixed-Use Business were permitted to be developed with intensities up to 5.2 FAR, which exceeded the allowable intensity of 2.0 FAR set forth in the Comp Plan for the Mixed-Use Business land use category. However, the densities allowed for those approved projects followed the Comp Plan, as the maximum density for the Mixed-Use Business land use category was 85 du/acre, whereas the maximum density allowable in the LDRs was 75 du/acre. Therefore, even though the City had not been evaluating the proposed site plans for compliance with the Comp Plan, all of the developed projects had densities that complied with the Comp Plan. In December 2018, a public hearing was conducted by the City Commission to consider the site plan for a development known as the Infinity Project. The proposed site for the Infinity Project was in the northern half of the Town Center. The City Commission unanimously voted to defer the matter to the January 2019 City Commission Meeting. To date, the application for site plan approval for the Infinity Project in the northern portion of the Town Center has not been approved or considered by the City Commission. While the City was considering the Infinity Project, the City became aware of the inconsistency between its Comp Plan and its LDRs with respect to the density and intensities within the entire Town Center area. As a result, the City began to take actions to remedy this inconsistency. In July 2019, the City Commission considered an ordinance to transmit to the state land planning agency, the Department of Economic Opportunity (DEO), a text-based comprehensive plan amendment to modify the FAR in the entire Town Center area. The City Commission voted to defer the matter. Instead, on August 28, 2019, the City Commission adopted on first reading an ordinance establishing a 12-month moratorium on the submission and consideration of any zoning applications in the Town Center District. The City Commission adopted the ordinance on second reading on September 19, 2019. On August 28, 2019, the City Commission also adopted a resolution declaring zoning in progress relating to development and redevelopment in the Town Center Zoning District. The Plan Amendments On October 17, 2019, the City Commission adopted on first reading Ordinance No. 2019-549, transmitting to DEO text-based amendments to the Town Center District that divided the Town Center into two overlay development districts: Town Center South and Town Center North. The text-based amendments also provided for density and intensity in the Town Center South overlay for the first time. Specifically, the maximum density was established at a maximum of 75 du/acre, and the intensity was established at a maximum of 5.2 FAR. These were the same as the LDRs. The Plan Amendments did not amend any portions of Policy 14C of the Comp Plan with respect to TDRs. The purpose of these amendments was to grandfather the various developments within Town Center South, which were previously approved with intensities that were inconsistent with the Comp Plan. Contrary to Petitioner's allegation, the density of each of these developments complied with the Comp Plan at the time of each’s approval. On October 17, 2019, the City Commission also adopted on first reading Ordinance No. 2019-550, transmitting to DEO the FLUM Plan Amendments reflecting the creation of the Town Center South and Town Center North overlay districts, and providing for amendment of the land use designation for certain properties located in Town Center South. Amendments to land use designations for specific properties in the Town Center South overlay area included changing the Bella Vista Park and Gateway Park from Mixed-Use Business to Recreation and Open Space. The Gateway Park Parking Garage changed from Recreation and Open Space to Community Facility. The Miami-Dade County Water and Sewer Facility changed from Mixed-Use Business to Community Facility. All these FLUM changes reflected a decrease in density. On October 17, 2019, the City Commission passed Resolution 2019-3006 (Plan of Action), adopting a schedule to bring the City's LDRs into conformity with the provisions of the amended Comp Plan, as provided by section 163.3194(1)(b). On October 30, 2019, the Florida Department of Transportation issued a letter to Alex David, the City’s planning and land use consultant, advising that it had reviewed the proposed text-based Plan Amendments and "found that the amendment will not have an adverse impact on transportation resources and facilities of State importance." On November 15, 2019, the South Florida Water Management District sent correspondence advising that there are "no regionally significant water resource issues" and offered only technical guidance regarding regional water supply planning. On November 25, 2019, the South Florida Regional Planning Council found that the proposed Plan Amendments were generally consistent with the Strategic Regional Policy Plan for South Florida. On November 22, 2019, the City's Mayor received correspondence from DEO advising that it had reviewed the proposed Plan Amendments and "identified no comment related to adverse impacts to important state resources and facilities within the [DEO's] authorized scope of review." DEO did provide a technical assistance comment. On December 19, 2019, the City Commission adopted both Ordinances on second reading. DEO's technical assistance comment directed the City to clarify that Town Center South and Town Center North were overlay districts and not separate land use categories. The City incorporated that clarification in bold text in the body of the adopted ordinance. The City then forwarded the adoption package of Plan Amendments to DEO for its review. On December 30, 2019, DEO issued a letter to Mr. David advising that the Plan Amendments package was complete and would be reviewed in accordance with section 163.3184(3). On January 28, 2020, DEO issued a letter to the City's Mayor advising that it had completed its review "and identified no provision that necessitates a challenge of the Ordinances adopting the amendment." Petitioner challenged the Plan Amendments on four grounds: (1) the City failed to submit relevant and appropriate data and analysis; (2) the Plan Amendments were internally inconsistent with the existing Comp Plan; (3) the Town Center South District was a new land use category; and (4) the Plan Amendments should not have been reviewed under the expedited review process pursuant to section 163.3184(2). Relevant and Appropriate Data and Analysis Petitioner alleged that the City did not provide any data or analysis to show it considered the impacts of alleged "massive increase of density and intensity in Town Center South on hurricane evacuation times [. . .]". Hurricane Evacuation Times and CHHA Petitioner's expert witness, Daniel L. Trescott, an expert in comprehensive planning and hurricane evacuation, opined that only increases in density would impact hurricane evacuation times, and that increases in intensity would not adversely affect hurricane evacuation times. Specifically, Mr. Trescott testified that if there was no increase in density then, in his expert opinion, the Plan Amendments would not trigger the need to evaluate the other policies and issues related to hurricane evacuation and Coastal High Hazard Areas (CHHA). Petitioner did not introduce any evidence that would support a finding that the Plan Amendments would actually increase density in Town Center South. Mr. Trescott testified that he did not perform an analysis that would demonstrate potential impacts on density resulting from the Plan Amendments. Also, Petitioner did not introduce any evidence to support a finding that the Plan Amendments would diminish future hurricane evacuation times, in the absence of a density increase. In fact, the undisputed testimony of the City's experts established that the Plan Amendments actually decreased the net density allowed in Town Center South. Claudia Hasbun, the City's planning and zoning director, was accepted as an expert in land use planning. Ms. Hasbun testified that the Plan Amendments would decrease the potential maximum allowable density in Town Center South by 462 dwelling units. Ms. Hasbun's analysis demonstrated that after consideration of the density provided by the Plan Amendments, including the land use changes reflected in the FLUM amendment, there was a significant reduction in potential maximum allowable density in Town Center South. Ms. Hasbun testified that the net total number of dwelling units that could ever be developed would decrease by 462 dwelling units for Town Center South because of the Plan Amendments. This analysis encompassed the absolute maximum redevelopment potential, and still reflected a reduction in density in Town Center South. Mr. Trescott confirmed that the potential maximum allowable density that existed under the current Comp Plan was actually greater than would be allowed under the Plan Amendments. He also acknowledged that land use changes reflected on the FLUM amendment would result in a decrease in density within Town Center South. Therefore, the uncontroverted evidence showed that the Plan Amendments decrease density. The City also presented the expert witness testimony of Alex David, the planning consultant with Calvin, Giordano & Associates, Inc. Mr. David testified that there would not be any impact on hurricane evacuation times resulting from the Plan Amendments. The reason was that the potential maximum allowable density resulting from the Plan Amendments was significantly reduced from the existing maximum potential density. Mr. David's testimony was undisputed, and Petitioner's expert witness conceded that there would be a net decrease in maximum potential density resulting from the Plan Amendments. Mr. David testified that a map created from a 2016 Sea, Lake, and Overland Surges for Hurricanes (SLOSH) computerized storm surge model was utilized to determine whether any portions of Town Center South were in the CHHA. The referenced SLOSH map was incorporated into the Comp Plan in 2016. Mr. David testified that the SLOSH model does depict five very minimal areas of Town Center South within the CHHA. However, those areas either have an underlying land use designation of Recreation Open Space, cannot be developed for residential purposes and have no density, or they are located on parcels that have already been developed (or in one case is currently being developed) at higher elevations. The parcels developed or being developed at higher elevations have the appropriate mitigation to remove them from the CHHA. As a result, under the 2016 SLOSH model map in the Comp Plan, none of the property affected by the Plan Amendments was located in the CHHA. During the hearing, Mr. Trescott suggested that the City should utilize the map developed from the 2017 version of the SLOSH model, rather than the 2016 version adopted in the Comp Plan. Despite testifying that the City was required to use the 2017 version of the SLOSH map, Mr. Trescott admitted that Miami-Dade County, the entity responsible for emergency management, had not adopted the 2017 SLOSH map. Mr. Trescott also admitted that the State of Florida had not adopted the 2017 SLOSH map into the State's Emergency Plan. In addition, Mr. David testified that he was unaware of any jurisdiction in Florida that had adopted the 2017 SLOSH map. Thus, it was reasonable for the City to rely on the data contained in the 2016 SLOSH map incorporated in its Comp Plan. Consistent with Mr. Trescott's testimony, since there is no increase in density, the Plan Amendments would not trigger the need to evaluate the other policies and issues related to hurricane evacuation and CHHA. Petitioner did not prove beyond fair debate that the City failed to provide relevant and appropriate data or analysis with respect to impact on hurricane evacuation times. The evidence adduced at the hearing established that such an evaluation was not required because density was decreased by the Plan Amendments. Even so, the evidence established that since density was decreased by the Plan Amendments, hurricane evacuation times would not be impacted, and that, pursuant to the 2016 SLOSH model map adopted in the Comp Plan, none of the property affected by the Plan Amendments was located within the CHHA. Concurrency Analysis Petitioner also contended that the City failed to submit any data or analysis to show the impacts on sewer and water capacities, traffic/transportation, coastal management, infrastructure, and schools. However, the memorandum incorporated into Ordinance No. 2019-549 clearly demonstrated that an analysis was conducted. The analysis determined that the City did meet its level of service (LOS) standards for each of those areas. In addition, Mr. David testified to the methodology used to analyze concurrency for each of the areas and the conclusions reached with respect to them. His testimony was not contradicted and demonstrated that the Plan Amendments meet the City's LOS standards. Mr. David testified that in completing the concurrency analysis, he utilized data based upon the existing development in Town Center South. He opined that the methodology was a conservative approach for evaluating concurrency. Mr. David also testified that all the projects developed in Town Center South had been individually and separately reviewed for concurrency purposes during the site plan approval process. Internal Inconsistency Petitioner alleged that the Plan Amendments were internally inconsistent with two provisions of the City's existing Comp Plan. Objective 3C, which reads as follows: The City of Sunny Isles Beach shall not increase maximum densities and intensities in the Coastal High Hazard Area beyond that which is permitted in the Comprehensive Plan and Land Development Regulations as of May 1, 2016, including bonuses and transfer of development rights provided therein. The provision of facilities and services to accomplish the timely evacuation of the City's residents in advance of approaching hurricanes shall be a priority of the Sunny Isles Beach's transportation and hurricane preparedness programs. The City's Comp Plan did not assign densities and intensities in the Town Center Development District overlay as of May 1, 2016. However, as previously found, the City's LDRs did include densities and intensities for the Town Center as of May 1, 2016. These Plan Amendments did not increase the densities and intensities contained in the LDRs as of that date, and therefore, are not internally inconsistent with the City's existing Comp Plan. Petitioner also asserted that the Plan Amendments were inconsistent with Policy 5C, which provides as follows: All planning activities pertaining to development and redevelopment and the provision of public services and facilities in the City of Sunny Isles Beach shall be consistent with the "Population Estimates and Projections" outlined below, as they are periodically amended and updated. During the hearing, the City introduced the 2019 population estimates derived from the U.S. Census Bureau. The census data reflected that the 2019 population estimate was 21,804, which was below the 2020 estimates set forth in Policy 5C. Further, the unrebutted testimony of the City's experts, Ms. Hasbun and Mr. David, was that the Plan Amendments would decrease the maximum potential density that could be developed in Town Center South. Petitioner did not introduce any evidence that the population estimates and projections would increase because of the Plan Amendments. Petitioner did not prove beyond fair debate that the Plan Amendments were internally inconsistent with Objective 3C and Policy 5C of the City's existing Comp Plan. New Land Use Category Petitioner alleged that Town Center South was a new land use category. Petitioner referenced the comments from DEO that the City should consider amending the FLU text to clarify that Town Center North and Town Center South are overlay districts, not separate land use categories. However, the City did specifically incorporate those comments in Ordinance No. 2019-549, where the word "overlay" appears in bold text to reflect said clarification. Petitioner's claim that the City created a new land use category called "Town Center South" was not supported by the evidence. Expedited Review Process Petitioner alleged that the City should not have proceeded with the expedited review process because of the City's alleged past failures to comply with the law. Section 163.3184(2) provides for an expedited review process for adoption of comprehensive plans and amendments. The two exceptions to this expedited review process are contained in section 163.3184(2)(b) and (c), neither of which are applicable to the Plan Amendments. Petitioner suggested that the Plan Amendments should have been treated as an evaluation and appraisal review (EAR) under section 163.3191. However, the determination of whether the comprehensive plan should be evaluated under this provision is the responsibility of the City. Also, the City's last EAR was conducted in 2016, so the City is not required to perform the analysis again until 2023. Petitioner failed to introduce any evidence to support a finding that the City is precluded from proceeding pursuant to section 163.3184(3). Summary Petitioner failed to carry her burden of proving beyond fair debate that the City of Sunny Isles Beach Plan Amendments adopted by Ordinance Nos. 2019-549 and 2019-550 on December 19, 2019, are not in compliance, as that term is defined in section 163.3184(1)(b).
Conclusions For Petitioner Magaly Gordo: Ralf Gunars Brookes, Esquire Ralf Brookes Attorney Suite 107 1217 East Cape Coral Parkway Cape Coral, Florida 33904 For Respondent City of Sunny Isles Beach: Gregory Thomas Stewart, Esquire Elizabeth Desloge Ellis, Esquire Nabors, Giblin & Nickerson, P.A. Suite 200 1500 Mahan Drive Tallahassee, Florida 32308 Valerie Vicente, Esquire Nabors, Giblin & Nickerson, P.A. Suite 1000 8201 Peters Road Plantation, Florida 33324
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Economic Opportunity enter a final order determining that the City of Sunny Isles Beach Plan Amendments adopted by Ordinance Nos. 2019-549 and 2019-550 on December 19, 2019, are "in compliance," as that term is defined in section 163.3184(1)(b). DONE AND ENTERED this 3rd day of September, 2021, in Tallahassee, Leon County, Florida. COPIES FURNISHED: S FRANCINE M. FFOLKES Administrative Law Judge 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 3rd day of September, 2021. Gregory Thomas Stewart, Esquire Nabors, Giblin and Nickerson, P.A. Suite 200 1500 Mahan Drive Tallahassee, Florida 32308 Elizabeth Desloge Ellis, Esquire Nabors, Giblin and Nickerson, P.A. Suite 200 1500 Mahan Drive Tallahassee, Florida 32308 Ralf Gunars Brookes, Esquire Ralf Brookes Attorney Suite 107 1217 East Cape Coral Parkway Cape Coral, Florida 33904 Janay Lovett, Agency Clerk Department of Economic Opportunity Caldwell Building 107 East Madison Street Tallahassee, Florida 32399-4128 Edward A. Dion, Esquire City of Sunny Isles Beach Fourth Floor 18070 Collins Avenue Sunny Isles Beach, Florida 33160 Valerie Vicente Nabors, Giblin and Nickerson, P.A. Suite 1000 8201 Peters Road Plantation, Florida 33324 Tom Thomas, General Counsel Department of Economic Opportunity Caldwell Building, MSC 110 107 East Madison Street Tallahassee, Florida 32399-4128 Dane Eagle, Executive Director Department of Economic Opportunity Caldwell Building 107 East Madison Street Tallahassee, Florida 32399-4128
Findings Of Fact By application dated October 9, 1984, the Palm Beach County Water Utilities Department applied for a permit to construct a temporary septage receiving facility at a location within Palm Beach County known as Sewage Treatment Plant 2S which is adjacent to and immediately north of Petitioner's neighborhood. It was estimated that this facility would receive between 30,000 and 50,000 gallons of septage each day from septic tanks in Palm Beach County. The specific operation procedure to be used at the site begins with access to the site from Forest Hill Boulevard, located to the north, using an unpaved, curved roadway. Septage trucks arriving at the site are faced with a potentially dangerous situation since the roadway is very narrow in parts, and is somewhat elevated and they therefore have to be very cautious to avoid accidents. The arriving trucks back over an asphalt paved area to a transfer box and discharge septage through a four-inch rubber hose into the transfer box. Septage flows through the transfer port and is distributed over a bar screen. Materials collecting on the bar screen are manually raked onto the drainage place, collected and placed into a dumpster for removal to a landfill. Septage then flows from the transfer box through a twelve inch pipe by gravity into a 120-inch wet well, and is diluted. The septage flows through an 8-inch sewer pipe by gravity into an existing pump station wet well on site. Two pumps then pump the septage into a force main system through which it flows to the West Palm Beach Regional Sewage Plant. The facility for which this permit is sought is intended to receive septage formerly deposited at Dyer Boulevard landfill septage facilities which has ceased operation under a Consent Order between Palm Beach County and the Department of Environmental Regulation. This is proposed as a receiving and transporting facility only, and not a treatment facility. Roy Duke, the Southeast District Manager with the Department of Environmental Regulation, who was accepted as an expert in environmental permitting, testified that in his opinion the site in question is the best site available to Palm Beach County for such a receiving facility. Due to the need to find a suitable replacement for the Dyer Boulevard site, the Department of Environmental Regulation requested that the County Water Utilities Department submit this application and supports the issuance of the permit. In accordance with an Operating Agreement between the Palm Beach County Health Department and the Department of Environmental Regulation, the County Health Department has authority to review and issue permits for sewage collection and transmission systems. Upon receipt of this permit application, the County Health Department requested additional information in the review process, which the County Water Utilities Department provided, in order to determine if "reasonable assurances" were being provided that the receiving facility would not discharge, emit, or cause pollution contrary to applicable standards, rules or regulations. According to Umesh Asrani, a Professional Engineer with the County Health Department, who was accepted as an expert in wastewater treatment technology, and the processing and evaluation of wastewater treatment facility permits, "reasonable assurances" have been given in this permit application. Testimony at the final hearing establishes that the proposed site has already been put into operation by the County with the approval of the Department of Environmental Regulation due to the emergency need to find an alternative to the Dyer Boulevard site. A temporary injunction was sought against this operation by residents of the area but it was not granted. The current operation of the facility is not challenged in this proceeding, but Petitioner points out that adverse effects on the neighborhood resulting from this operation are relevant to the issuance of the permit sought in this case. Specifically, Petitioner Kevin Donovan testified that truck traffic and noxious odors have increased since the operation began and would be expected to continue if the permit is granted. He has also seen evidence of spills at the site, and introduced evidence to establish that "sludge" containing commercial wastes and grease was being deposited at the site as well as "septage." Petitioner expressed his concern that hazardous wastes could be deposited at the site. Roy Duke testified that small amounts of hazardous wastes could be disposed of in residential septic tanks and ultimately collected at this site, but that in his opinion this was not a widespread practice, and the amounts would not present a danger to health or the environment. Petitioner also expressed his fear that the surface and ground water could be contaminated from leaks and spills occurring at the site. Expert witnesses testifying on behalf of Respondents stated that no such discharges were reasonably likely to occur. The greater weight of the evidence supports Respondents' position that reasonable assurances have been given that dangerous amounts of hazardous wastes will not be deposited at the site, and that surrounding surface and ground waters will not be contaminated by operation of the site. With the exception of a pH test which is conducted at the site when septage is received to determine its level of acidity, no tests or treatment are performed on the septage at the site. It is simply deposited and transmitted through the sewer system to the West Palm Beach Regional Sewage Plant for testing, treatment, and final disposal. The amount of septage deposited at this site is very small (30,000 to 50,000 gallons per day) in relation to the total amount treated each day at the Regional Sewage Plant (approximately 40 million gallons per day). Based upon bills of lading for deposits at the site since it was placed in operation, the site is used to receive and collect septage, including grease and sludge, from residences, restaurants, construction sites, digesters, and race tracks.
Recommendation Based upon the foregoing, it is recommended that a Final Order be entered issuing the permit sought by the Palm Beach County Water Utilities Department and denying the relief sought by Petitioner. DONE and ENTERED this 2nd day of May, 1985, at Tallahassee, Florida. DONALD D. CONN Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 2nd day of May, 1985. COPIES FURNISHED: Frank A. Kreidler, Esquire 521 Lake Worth Avenue Suite 3 Lake Worth, Florida 33460 Julia D. Cobb, Esquire Department of Environmental Regulation 2600 Blairstone Road Tallahassee, Florida 32301 Thomas C. McEaddy, Jr., Esquire Post Office Box 1989 West Palm Beach, Florida 33402 Victoria Tschinkel, Secretary Department of Environmental Regulation Twin Towers Office Building 2600 Blairstone Road Tallahassee, Florida 32301
The Issue Whether respondent's registered building contractor's license should be revoked, suspended or otherwise disciplined based on allegations he violated (1) Section 489.129(1)(c), Florida Statutes, in that he violated a provision of Chapter 455, Florida Statutes; (2) Section 489.129(1)(g), Florida Statutes, in that he acted in the capacity of a contractor under a name other than on his registration; and (3) Section 489.129(1)(j), Florida Statutes, in that he failed, in two material respects, to comply with the provisions of Chapter 489, Florida Statutes.
Findings Of Fact At all times material hereto, respondent was licensed by the Construction Industry Licensing Board as a registered building contractor, having been issued a license number RR 0007671. He was not, however, licensed as a roofing contractor. Neither did he, at any time, qualify Gus Schmidt Home Improvements, Inc., with the Construction Industry Licensing Board. (See Petitioner's Exhibit 1). In 1968, respondent was issued a limited general contractor's license by Palm Beach County, Florida, under which he was authorized to install roofs only on structures which he constructed; he was not authorized to re-roof existing roofs. He has continuously renewed this local license, from 1968 to the present. On November 26, 1979, he qualified Gus Schmidt Home Improvements, Inc., with the Palm Beach County Construction Industry Licensing Board, which qualifications he has maintained to the present time. (See Petitioner's Exhibits 5). At all times material hereto, he held no other certificates of competency issued by Palm Beach County, Florida. At all times material hereto, he was the only qualifier for Gus Schmidt Home Improvements, Inc. ( See Petitioner's Exhibit 5). On or about May 5, 1980, he signed and submitted a notarized letter of authorization to the Palm Beach County Building Department. By this letter, he authorized Linda DeVito, his daughter, to obtain local building permits in the name of Gus Schmidt Home Improvements, Inc., and accepted liability for all acts performed under the permits. (See Petitioner's Exhibit 6). On or about May 29, 1980, Gus Schmidt Home Improvements, Inc., contracted with Mr. and Mrs. Garrett McLaughlin to remove and replace the existing roof over the carport and entry-way of the McLaughlin's home, and waterproof the entire roof. The house is located at 2041 Upland Road, West Palm Beach, Florida. The contract was signed by an employee of the respondent, and contained a five-year warranty on the work performed by Gus Schmidt Home Improvements, Inc. The contract price was $2,532.00. (See Petitioner's Exhibit 8). On or about June 16, 1980, Linda DeVito, as the authorized agent for Gus Schmidt Home Improvements, Inc., applied for a county building permit to perform the roofing work on the McLaughlins' home. Based on her application, a county building permit, number 80-14711, was issued to Gus Schmidt Home Improvements, Inc. (See Petitioner's Composite Exhibit 7). This permit was issued based on respondent's letter of authorization, dated March 5, 1980, which was on file with the Palm Beach County Building Department. (See Petitioner's Exhibits 6 and 7). In or about August 1980, Gus Schmidt Home Improvements, Inc., completed the re-roofing work on the McLaughlins' home, without subcontracting it. Between May 29, 1980, and July 29, 1980, Mrs. McLaughlin paid Gus Schmidt Home Improvements, Inc., $2,532.00--the full contract price. (See Petitioner's Exhibit 10). A few weeks after the roofing work was completed, Mrs. McLaughlin checked the roof and discovered that the coating had not completely covered it. There were openings where stones were showing. She became concerned and called Gust Schmidt Home Improvements, Inc. She was told not to worry because the work was covered by a five-year warranty. During 1981, weeds began to grow on the McLaughlins' roof. In May or June of 1982, Mrs. McLaughlin called respondent to complain about the roof's condition. He told her that he had gotten out of the business before the work on the McLaughlins' home was completed, and that a company on Lake Avenue in West Palm Beach, Florida, had done the work on her home. He told her that he would call her back with further information, but never did. When respondent did not call back with further information, Mrs. McLaughlin checked the phone book and decided that respondent must have been referring to a company called Florida Exteriors. She called that company and was told that they would honor her warranty. But the roof on Mrs. McLaughlin's home was never repaired, even though the roof leaked where boards had been replaced.
Recommendation Based on the foregoing, it is RECOMMENDED that respondent's contractor's license be suspended for six months, and that he be administratively fined $1000. DONE AND ENTERED this 12th day of April 1984 in Tallahassee, Florida. R. L. CALEEN, JR. Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 12th day of April 1984. COPIES FURNISHED: Stephanie A. Daniel, Esquire Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 Gus Schmidt 602 North "A" Street Lake Worth, Florida 33460 James Linnan, Executive Director Construction Industry Licensing Board Post Office Box 2 Jacksonville, Florida 32202 Fred M. Roche, Secretary Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301
The Issue Whether the Sherry Petitioners have standing to initiate the proceeding in Case No. 10-0515? Whether the Oceania Petitioners have standing to initiate the proceeding in Case No. 10-0516? Whether the MACLA Intervenors have standing to intervene? Whether the Department should enter a final order that issues the JCP, the Variance and the SSL Authorization?
Findings Of Fact Setting and Preliminary Identification of the Parties These consolidated cases are set in Okaloosa County. They concern the Consolidated NOI issued by the Department to the County that indicate the Department's intent to issue state authorizations to allow the restoration of a stretch of beach known as the Western Destin Beach Restoration Project (the "Western Destin Project" or the "Project"). In addition to the Western Destin Project, there are other beach restoration efforts (the "Other Beach Restorations") which concern the Gulf of Mexico coastal system along the shores of the Florida Panhandle and about which the parties presented evidence in this proceeding. The applicants for the authorizations in the Other Beach Restorations efforts are either Okaloosa County or Walton County, the coastal county immediately to the County's east, and concern Okaloosa and Walton County property or are on federal property used by Eglin Air Force Base (the "Eglin Projects" or "A-3" or "A-13"). The Eglin Projects have been completed. The source of the sand use in the Eglin Projects is a borrow area designated by the County and its agent, Taylor Engineering, as "OK-A" ("OK-A" or the "OK-A Borrow Area"). The County intends that the OK-A Borrow Area be the source of sand for the Western Destin Project. West of East Pass, a passage of water which connects Choctawhatchee Bay and the Gulf of Mexico, the OK-A Borrow Area is between 4,000 and 5,000 feet off the shores of Okaloosa Island. Okaloosa Island is not an island. It is an area of the incorporated municipality of Fort Walton Beach that sits on a coastal barrier island, Santa Rosa Island. Except for the part of the final hearing conducted in Tallahassee, the final hearing in this case took place in Okaloosa Island. As Mr. Clark put it (when he testified in that part of the hearing not in Tallahassee), "I am in Okaloosa Island. [At the same time], I am on Santa Rosa Island." Tr. 521 (emphasis added). Petitioners in Case No. 10-0515, David and Rebecca Sherry and John Donovan (the "Sherry Petitioners") live along a stretch of beach that is in Okaloosa Island. They do not live along the stretch of beach that is within the area subject to the Western Destin Project. The Sherry Petitioners' stretch of beach is the subject of another beach restoration effort by the County (the "Okaloosa Island Beach Restoration Project"). The Okaloosa Island Beach Restoration Project, in turn, is the subject of another case at DOAH, Case No. 10-2468. The OK-A Borrow Area is much closer to the Sherry Petitioners' property than to the beach to be restored by the Western Destin Project. The Sherry Petitioners recognize the need for the restoration of at least some of the beaches in the Western Destin Project. The Sherry Petitioners initiated Case No. 10-0515, not to prevent the Western Destin Project from restoring those beaches, but because they are concerned that the beaches subject to the Okaloosa Island Project (including "their" beach) will suffer impacts from the dredging of the OK-A Borrow Area whether the dredging is done to serve the Western Destin Project or the other Projects the OK-A Borrow Area has served or is intended to serve. In contrast to the Sherry Petitioners, the Petitioners in Case No. 10-0516 (the "Oceania Petitioners") do, in fact, live on beaches in a section of the Western Destin Project that was slated for restoration when the Consolidated NOI was issued. The Oceania Petitioners are opposed to the restoration of the beaches subject to the Western Destin Project. They initiated Case No. 10-0516, therefore, because of that opposition. Walton County applied authorizations from the state for the Walton County/East Destin Project (referred-to elsewhere in this order as the "Walton Project"). The Walton Project, like the Eglin Projects, is completed. Unlike the Eglin Projects, and the intent with regard to the Western Destin Project and the Okaloosa Island Project, the Walton Project did not use the OK-A Borrow Area as its source of sand. The Walton Project used a Borrow Area to the east of OK-A (the "Walton Borrow Area"). The Walton Borrow Area is in an area influenced by the ebb tidal shoal formed by the interaction between East Pass and the Gulf of Mexico. The MACLA Intervenors (all of whom own property deeded to the MHWL of the Gulf in the stretch of beach subject to the Western Destin Project) together with the Sherry Petitioners and the Oceania Petitioners, seek findings in this proceeding concerning the impacts of the Walton Borrow Area to the beaches of Okaloosa County. They hope that findings with regard to Walton Borrow Area beach impacts will undermine the assurances the County and the Department offer for a finding that the Western Destin Project will not cause significant adverse impacts to the beaches of Okaloosa County. The Holiday Isle Intervenors support the Project. They are condominium associations or businesses whose properties are within the Project. Like the Eglin Projects, the Walton Project is complete. The Walton Project was the subject of a challenge at DOAH in Case Nos. 04-2960 and 04-3261. The challenge culminated at the administrative level in a Final Order issued by the Department that issued the state authorizations necessary to restore the Walton Project beaches. The Walton Project Final Order was appealed to the First District Court of Appeal where it was reversed. But it was reinstated in a decision by the Florida Supreme Court. The Florida Supreme Court decision was upheld when the United States Supreme Court issued a unanimous 9-0 decision less than two months before the commencement of the final hearing in these consolidates cases: Stop the Beach Renourishment, Inc. v. Fla. Dep't of Envtl Prot., 130 S. Ct. 2592 (2010). The Court held in Stop the Beach Renourishment that the Walton County Project was not a regulatory taking of property that demanded compensation to affected property owners under the Fifth Amendment to the United States Constitution. Stop the Beach Renourishment was argued before the United States Supreme Court in December of 2009, shortly before filing of the petitions that initiated these consolidated cases. The final hearing in these cases was not set initially until July 2010 in the hope that the Stop the Beach Renourishment case would be decided, a hope that was realized. In the meantime, another event threatened to affect these consolidated cases: the Deepwater Horizon Oil Spill (the "Oil Spill") in the Gulf of Mexico. The spill began with the explosion of the Deepwater Horizon oil platform in April of 2010 and continued until August of 2010 when the Oil Spill was stopped while these cases were in the midst of final hearing. The Joint Coastal Permit issued by the Department was revised to address impacts of the Oil Spill. No impacts, however, were proven in this proceeding by any of the parties. The Parties The Sherry Petitioners and Their Property David and Rebecca Sherry, husband and wife, are the leaseholders of "Apartment No. 511 [ a condominium unit] of Surf Dweller Condominium, a condominium with such apartment's fractional share of common and limited elements as per Declaration thereof recorded in Official Records . . . of Okaloosa County, Florida."2/ Their address is 554 Coral Court, #511, Fort Walton Beach, FL 32548. The Sherrys entered the lease for their condominium unit in May of 2002 in anticipation of it being their retirement home. After retirement, "towards the end of 2005," tr. 840, the unit became their permanent residence. They chose their home after an extensive search for the best beach in America on which to reside. The couple toured the Gulf Coast of Florida, the Keys and the Atlantic seaboard from South Florida into the Carolinas. Both explained at hearing why they picked the Panhandle of Florida in general and selected the Surf Dweller Condominium in particular as the place that they would live during retirement. Mr. Sherry testified: Tr. 841. This particular area we chose because of the beach quality. Quite frankly, . . . I was surprised when I first saw the place . . . the really stunning quality of it. The sand is absolutely beautiful. The water has that clear green hue. You can walk off shore and it just looks great. There isn't any other place like it in the Continental US that I've ever seen. Mrs. Sherry elaborated about the reasons for their choice to reside on the beach adjacent to the Surf Dweller and their enjoyment of the beach in the Okaloosa Island area of Santa Rosa Island. "We moved here for the quality of the beach, the sugar white sand." Tr. 936 (emphasis added). She explained that both she and her husband walk or run the beach daily. Mr. Sherry always runs; Mrs. Sherry's routine is to walk and run alternately. There are other distinctions in their daily traverses over the sugar white sand of Okaloosa Island. Mr. Sherry sometimes runs in shoes. As for Mrs. Sherry, however, she professed, I always run barefoot. I always walk barefoot and I take longer walks than he does. He runs the whole Island. I walk the whole Island and I run 3 miles at a time of the Island. So, that's the difference in the way we use [the beach.] Id. Mrs. Sherry described her activities on the beach more fully and how she enjoys it: I . . . swim. I surf on the skim board, float out in the water . . . I help Dave fish, we crab, . . . all sorts of things like that for recreation. Pretty much a beach person. I sit down on the beach under an umbrella with a lot of sunscreen. * * * I've always run barefoot. That's the reason [we chose the beach next to the Surf Dweller], it's not only the quality of the sand, [it's also] the fact that it's so soft because as I've aged, my husband and I have both been running for 30 years. He's in much better shape. I can still run barefoot and I can do a good pace, but if I've got shoes on, it's not nearly as much fun and I don't do nearly as much of it. So, to me, being able to have the squeak [of the sand underfoot], which you don't have with the restored sand is a big deal and having to wear shoes is a big deal. I really like to . . . [cross the beach] barefoot. Tr. 939. I actually think the project will impact me, at least, as much as my husband, David . . . my husband is . . . involved with . . . being board president of the Surf Dweller[.] I spend at least as much time as he does on the beach. And the way our furniture is arranged in the unit, it's so that when I'm in the kitchen, I bake the cookies, I see the beach, when I'm at the computer I can see the beach. I've got all the best views. So, I think I'm . . . extremely involved with it. It's the first thing I see in the morning; it's the last thing I see at night and I'm down there every morning. In fact, I was on the beach this morning before we came in . . . I don't miss my morning walk. Tr. 950. The Surf Dweller Condominium is located in Block 5 of Santa Rosa Island,3/ Okaloosa County, on real property that was deeded to the County by the federal government and then subsequently leased out by the County under long-term leases. The legal description of the Surf Dweller Condominium,4/ is: LOTS 257 TO 261, INCLUSIVE, LOTS 279, 280, 281, BLOCK 5, SANTA ROSA ISLAND, PLAT BOOK 2, PAGE 84, OKALOOSA COUNTY. Ex. P-8, PET7158. Block 5 of Santa Rosa Island is subject to Protective Covenants and Restrictions adopted by the Okaloosa Island Authority and recorded in the Official Records of the County at Book 121, Pages 233-250. See County Ex. 13. The Protective Covenants and Restrictions set up four classifications of areas denominated as Zones B-1 through B-4.5/ Block 5 of Santa Rosa Island is in Zone B-2, "Apartment, Hotel Court and Hotel Areas."6/ Part F of the Protective Covenants and Restrictions, provides, in part, Beach Protection * * * The beaches, for 300 feet inland from mean water level (or to the dune crest line, whichever is the greater distance), are under strict control of the Authority . . . One hundred fifty feet inland from the mean water line, in front of all B1 and B2 Areas, will be public beaches. The next 150 ft. inland will be private beaches as set out on subdivision plats . . . County Ex. 13, at page marked "BOOK 121 PAGE 242." The Surf Dweller Condominium property, lying between reference monuments R-6 and R-7, does not extend as far south as the mean high water line ("MHWL") of the Gulf of Mexico. From testimony provided by Mr. Sherry, see below, it appears that the Surf Dweller condominium property is deeded to the border with the beaches governed by Part F of the Protective Covenants and Restrictions. John Donovan is the leaseholder of "APARTMENT NO. 131 AND APARTMENT NO. 132, OF EL MATADOR, A CONDOMINIUM AS PER DECLARATION THEREOF, AS RECORDED IN . . . THE PUBLIC RECORDS OF OKALOOSA COUNTY, FLORIDA."7/ The address of the El Matador is 909 Santa Rosa Boulevard, Fort Walton Beach, FL 32548. Petitioner Donovan is not a resident of the State of Florida. His primary residence is in the State of Georgia. Mr. Donovan described in testimony his use and the use of his family of the beach seaward of El Matador and other parts of the Okaloosa Island area of Santa Rosa Island: I've . . . got to walk [for reasons of health] and I do walking every day I'm down here[.] I get all the way down to East Pass. I don't get down there every day, but I get down there a lot. My sons and my one grandchild take great pleasure in fishing off there, right at the end where the East Pass is right from the surf. * * * I swim. I don't swim probably as much as my co-petitioners [the Sherrys], but I'm sure I go out further. And I don't surf like David [Sherry] does but my grandchild would never tell me that I don't. I run as much as I can. Not as much as I used to. We also take long walks. Tr. 973-4. In a plat of El Matador Condominium introduced into evidence as part of Exhibit P-7, El Matador is described as: A CONDOMINIUM OF LOTS 557 THROUGH 590 INCLUSIVE, BLOCK 9 AND THE INCLUDED PORTION OF PORPOISE DRIVE THEREOF SANTA ROSA ISLAND A SUBDIVISION OF BLOCK 9 A RESUBDIVISION OF BLOCK 8 AS RECORDED IN PLAT BOOK 2, PAGE 190, PUBLIC RECORDS OF OKALOOSA COUNTY, FLORIDA Exhibit P-7, last page (un-numbered). Block 8 of Santa Rosa Island (like Block 5 in which the Surf Dweller Condominium is located) is also in Zone B-2 set up by the Protective Covenants and Restrictions. Block 8, just as Block 5, is governed by Part F, Beach Protection, of the Protective Covenants and Restrictions that places the beaches, for at least 300 feet inland, of the segment of Santa Rosa Island to which Block 8 is adjacent under the strict control of the County and makes the first 150 feet inland from the MHWL "public beaches." County Ex. 13, at page marked "BOOK 121 PAGE 242." El Matador Condominium lies between reference monuments R-1 and R-2. It is not deeded to the MHWL of the Gulf. The plat that is the last page of County Exhibit 13 shows the southern edge of the El Matador condominium property to be adjacent to the "FREEHOLDERS BEACH," Exhibit P-7, last page (un-numbered), landward of the Gulf of Mexico, that is, to the edge of the area of the private beach designated under the "Beach Protection" provision of the Protective Covenants and Restrictions, landward of the public beach designated by the same provision. Neither the Surf Dweller Condominium Property in which the Sherrys reside, nor the El Matador Condominium Property inhabited by Mr. Donovan abuts or is a part of the area subject to the Western Destin Beach Restoration Project. The two properties in Okaloosa Island are to the west of the Project. The Sherrys and Mr. Donovan did not initiate Case No. 10-0515 because they oppose the restoration of the beach subject to the Project. They initiated the proceeding because of concerns that the borrow area that will serve the Project is so close to Okaloosa Island and situated in such a way that once dredged it will cause adverse impacts to the Okaloosa Island beaches to the detriment of their use and enjoyment of the beaches. The Beach, Post-Hurricane Opal and Other Tropical Storms Beginning with Hurricane Opal in 1995, the beaches and shores adjacent to the Surf Dweller and El Matador Condominium Properties were seriously damaged. Nonetheless, there is a significant stretch of dry beach between the Surf Dweller and El Matador condominium properties and the MHWL of the Gulf. In the case of the Surf Dweller Property, Mr. Sherry estimated the width of the beach between the condominium property and the MHWL to be 300 feet. See his testimony quoted, below. The MHWL of the Gulf of Mexico is a dynamic line, subject to constant change from the natural influences of the coastal system. Whatever effect its ever-changing nature might have on the width of the beaches declared public and private8/ between the MHWL and the Surf Dweller and El Matador condominium properties, however, there can be no doubt on the state of the record in this proceeding that at the time of hearing there existed a 150 foot-wide stretch of beach water-ward of the two condominiums that the public has the legal right to occupy and use. Indeed, Petitioner David Sherry, when asked about the private beach and public beach governed by the Part F of the Protective Covenants and Restrictions in cross-examination conducted by Mr. Hall on behalf of the County, confirmed as much when he related the actual practice by the public in using it and the response that public use generated from him and his wife: Q If someone . . . crosses Santa Rosa Boulevard and utilizes this access[-]way that's marked on the map that you identified earlier, do they have the right to utilize any of the portion of [the private beach] of that 150-foot portion in front of your condominium? A . . . [N]o, they wouldn't have the right to do that. Q . . . [D]o they have the ability to set up an umbrella or place their towel within that 150-foot area [of private beach] in front of your condominium? A In that area, no. In the area south of that [the public beach] , which is where everyone actually sets up and wants to set up, in that area south, people set up and we don't have any problem with that. We let people do it -- Q On [the] public beach[.] A On the public beach they're perfectly free to do that. * * * Q I believe your testimony today, based on your GPS calculations, was that you have 300 feet of dry sand beach . . . running from the boundary of the condominium to the edge of the Gulf of Mexico; is that correct? A Essentially, from the building to the Gulf of Mexico. * * * Q So, 300 feet, roughly, from the boundary of the Surf Dweller Condominium common area down to the waterline? A Correct. Q So, there would be enough room today, based on the language of the restrictive covenants to have . . . 150 feet of public beach and then the 150 feet of Freeholders Beach as designated on the plat [in County Exhibit 13] now? A Much like it was in 1955 [when the Protective Covenants and Restrictions were adopted and recorded], yes. Tr. 891-3, (emphasis added). Since the first 150 feet of beach landward of the MHWL under the Protective Covenants and Restrictions is "public beach," there is no doubt that there is a stretch of beach between the Surf Dweller Condominium and the MHWL that is public beach and its width is at least 150 feet.9/ From aerial photographs introduced into evidence, the same finding is made with regard to beach that is public between El Matador and the MHWL of the Gulf. Mr. Donovan testified that his leasehold interest in his units at El Matador along with the interests of the other El Matador condominium unit leaseholders included 150 feet of private beach landward of the 150 feet of public beach adjacent to the MHWL of the Gulf of Mexico. His lawyer, moreover, advised him not to convert his leasehold interest into a fee simple ownership in order to protect his interest in access to the private beach designated by the Protective Covenants and Restrictions. See Tr. 986-87. Mr. Donovan is concerned about the erosion and turbidity impacts the borrow site could have on the Gulf and the beach. Erosion would change his view of the beach from the window of his condominium unit and aggravate a scalloping of the shore. The unevenness of the scalloped surface would cause him difficulties in his walks. Turbidity could attract sharks which would make it unsafe for him to swim. Most importantly to him, a change in the beach and shoreline along the El Matador Condominium property as drastic, in Mr. Donovan's view, as that contemplated by the Draft JCP could deter his family members (his grandchild included) from visiting him and vacationing at his unit in the El Matador Condominium. The Guidry Petitioners and Their Property Roland Guidry, a retired Colonel in the United States Air Force, is co-trustee of the Guidry Living Trust and the President of the Oceania Owners' Association, a condominium association governed by chapter 718, Florida Statutes. The Guidry Living Trust is the owner of Condominium Unit 605 in the Oceania Condominium, a condominium established under chapter 718, Florida Statutes. The address of the unit is 720 Gulf Shore Drive, Unit 605, Destin, Florida, 32541. In his capacity as co-trustee, Mr. Guidry has the independent power to protect, conserve, sell, lease or encumber, or otherwise to manage and dispose of trust assets, which include Unit 605 in the Oceania Condominium. The Oceania Owners' Association is mandated by the Oceania Declaration of Condominium to "maintain, manage and operate the condominium property." Ex. P-6 at 4. The declaration also declares, "[a]ll unit owners shall automatically become members of the association after completion of closing of the purchase of a unit in Oceania, A Condominium." Id. The Guidry Living Trust, therefore, is a member of Oceania Condominium Association. The powers of the officers and directors of the Oceania Owners' Association are set forth in the Declaration of Condominium that governs Oceania: The officers and directors of the association shall have the powers set forth in this declaration and the association bylaws, and shall, at all times, have a fiduciary relationship to the members of the association and shall operate and manage the association in the best interest of its members. Id. Oceania's Declaration of Condominium, furthermore, prescribes that "[t]he association shall have all powers granted by Chapter[s] 718 and 617, Florida Statutes." Id. at 5. Every member of the Oceania Owners' Association Board of Directors approved the initiation of Case No. 10-0516, according to the testimony of Colonel Guidry, but there was no documentary evidence offered that a vote had been taken of the Board of Directors at a board meeting on the issue of whether to file the petition that initiated Case No. 10-0516 or the outcome of any such vote. As an owner of a unit in Oceania, The Guidry Living Trust owns an undivided share of the Oceania Condominium's common property10/ which "comprise[s] all the real property improvements and facilities to Oceania, A Condominium, including all parts of the building other than the units . . . and . . . [certain] easements . . . ." P-6 at 1, 2. The Oceania Condominium real estate is deeded to the "APPROXIMATE MEAN HIGH WATER LINE OF THE GULF OF MEXICO". P-6, Exhibit "B." The Surveyor's Certificate on the survey of Oceania, A Condominium, attached to the Oceania Declaration of Condominium is dated January 16, 1996. The date is more than two months after Hurricane Opal made landfall and damaged the Okaloosa County coastline in October of 1995. Standing of the Oceania Petitioners Colonel Guidry did not appear at hearing in a personal capacity. He appeared in his capacities as co-trustee of the Guidry Living Trust and President of the Oceania Owners' Association. In contrast to the Sherry Petitioners, therefore, Colonel Guidry did not allege his personal use and enjoyment of the beach as a basis for standing. As to injury and standing of both the Guidry Living Trust and the Oceania Owners' Association, Colonel Guidry asserted a number of interests that he believed will be substantially affected by the Project. They fall into four categories of concern. The first concern is with regard to the action of the sand along the shoreline of the Oceania property after the two reaches of beach to the east and west will have been restored under the revisions to the Draft JCP. After construction activities, sand along the shoreline will equilibrate, that is, the sand will move or be transported so as to stabilize the shoreline. This stabilization or achievement of shoreline equilibrium will tend to move the shoreline along the Oceania property waterward. Colonel Guidry expressed his concern as follows: [The Oceania property] would be sandwiched . . . between two public beaches . . . mother nature will fill in what I call the Oceania Gap. Right now the only line we have on our beach is our southern property line [the MHWL of the Gulf][11] . . . . That's the only line I know of that's on our beach or will be placed on our beach. But if sand fills in, then that creates a cloud of confusion, if the State lays claim to this sand that accumulates in the Oceania Gap, as a result of the construction on both sides of us. Tr. 764, (emphasis added). The second category of concern relates to the location of the property post-construction between "two public beaches." Such a location, in Colonel Guidry's view, would make individual units at the Oceania Condominium less valuable. The third category is that the public would be more likely to trespass on private Oceania property. The fourth concern of Colonel Guidry is that the Project will have undesirable impacts to Oceania property owners' littoral rights to accretion and to touch the water. The first three concerns all stem from a decision made by the Board of County Commissioners after this proceeding was commenced to remove the Oceania property from the Project. Oceania Removed The beach and shore in the southern part of the Oceania condominium property,12/ (the "Oceania Beach Segment of Shoreline" or the "Oceania Gap") were originally subject to the Consolidated NOI for the Western Destin Beach Restoration Project. But on the eve of the date scheduled for the commencement of the final hearing in these cases, the Board of County Commissioners for Okaloosa County voted to remove the Oceania Beach Segment of Shoreline from the application for the Project. Taylor Engineering (the County's Agent) submitted a request to the Department that reads: On behalf of Okaloosa County, Taylor Engineering submits its request to modify the project area and Draft Joint Coastal Permit for the Western Destin Beach Restoration Project . . . The applicant has decided to remove the Oceania Condominium Property from the beach fill placement area. The revised project, as described in the enclosed permit drawings, includes two reaches: Reach 1 extends from the east jetty of East Pass to approximately 600 ft east of FDEP reference monument R-22 (R-22.6) and Reach 2 extends from approximately 200 feet east of R-023 (R- 23.2) to R-25.5. The Oceania Property defines the gap between Reach 1 and Reach 1. Additionally, we request the FDEP modify Specific Condition 1 of the Draft Joint Coastal Permit to reflect the modified project area. More specifically, we request that the Mean High Water Line Survey requirement of Specific Condition 1 exclude the Oceania Condominium property. Notice of Filing Request for Modification and Revised, Draft Joint Coastal Permit, Exhibit A. Revisions to the Original Draft JCP In light of the vote and based on the County's request, DEP filed a Revised Notice of Intent on July 26, 2010, which included revision of the Draft JCP (the "First Revised Draft JCP"). The First Revised Draft JCP eliminated the Oceania Beach Segment of Shoreline from the Project and took other action such as requiring the applicant to check for oil in the OK-A Borrow Area prior to construction by both visual inspection and analysis of sand samples because of the ongoing Deepwater Horizon Oil Spill in the Gulf. The revision also included changes to Specific Condition 5 of the Draft JCP.13/ On August 18, 2010, the Department gave notice of another revision of the JCP (the "Second Revised Draft JCP"). The Second Revised Draft JCP changed Specific Condition 1 of the JCP by eliminating the requirement that the County establish a pre-project MHWL prior to undertaking construction activities and instead requires the County to conduct a survey in order to locate an erosion control line ("ECL"). The revisions to the Draft JCP stirred interest in participating in this proceeding among a group of property owners who do not want the beaches along their properties restored: the MACLA Intervenors. The MACLA Intervenors and Their Properties On September 8, 2010, a petition to intervene (the "MACLA Petition to Intervene") was filed by nine putative intervenors: MACLA LTD II, a Limited Partnership ("MACLA"); H. Joseph Hughes as Trustee of the Betty Price Hughes Qualified Vacation Residence Trust ("Hughes Trust"); Kershaw Manufacturing Company, Inc. ("Kershaw"); Kayser Properties LLC ("Kayser"); Destin, LLC ("Destin"); Paul Blake Sherrod, Jr., and Cindy M. Sherrod ("Sherrods"); Blossfolly, LLC ("Blossfolly"); 639 Gulfshore, LLC ("639 Gulfshore"); and Laura Dipuma-Nord ("Nord"), (collectively, the "MACLA Intervenors.") All nine of the MACLA Intervenors own real property in the City of Destin within the Project area that fronts the Gulf of Mexico. All nine properties have the MHWL of the Gulf as their southern boundary. MACLA is a Texas Limited Partnership. Louise Brooker is its president. The address of its property is 620 Gulf Shore Drive. The Hughes Trust owns a one-third interest in real property at the address of 612 Gulf Shore Drive. H. Joseph Hughes is a trustee of the Hughes Trust. Kershaw is an Alabama corporation. The address of its property is 634 Gulf Shore Drive. The address of the Kayser property is 606 Gulf Shore Drive. The address of the Destin property is 624 Gulf Shore Drive. The address of the Sherrods' property is 610 Gulf Shore Drive. The address of the 639 Gulfshore property is 6346 Gulf Shore Drive. The address of the Blossfolly property is 626 Gulf Shore Drive. The address of Ms. Dipuma-Nord is 600 Gulf Shore Drive. The properties owned by the MACLA Intervenors are among 18-single family lots located between a rough mid-point of reference markers R-020 and R-021 and a rough mid-point of reference markers R-022 and R-023. See Ex. P-238. These 18 single-family lots are in the approximate middle of the Project. The Oceania property, eliminated from the Project at the time of the filing of MACLA Petition to Intervene, is just to the east of the 18 single family lots in which the properties of the MACLA Intervernors are located. (Reference marker R-023 is set along the shoreline adjacent to the Oceania property.) The MACLA Intevenors' properties and the Oceania property are within the area from R-020.3 to R-023.3 (the "Middle Segment", see discussion of Critically Eroded Shoreline, below). According to an evaluation conducted by the Department on January 7, 2009, the Middle Segment of the beach is one in which "[u]pland development is not currently threatened." Ex. P-238. Timeliness of the MACLA Petition to Intervene The MACLA Petition to Intervene was filed well after the commencement of the hearing. Under rule 28-106.205, because it was filed later than 20 days before the commencement of the hearing, it could only be accepted upon "good cause shown" or if the time for filing were "otherwise provided by law." The MACLA Petition to Intervene was also filed after the Department had entered an order dismissing petitions for administrative hearings filed by three of the MACLA Intervenors14/ to contest the Second Revised JCP. The order of dismissal with prejudice by the Department dated September 7, 2010, was entered on the following bases: First, the Petitioners had a clear point of entry to challenge the proposed permit after it was publicly noticed on January 9, 2010. The Petitioners failed to timely challenge the proposed permit when given the opportunity to do so. Second, it is well settled that any proposed modifications to a proposed permit made during the course of a de novo proceeding to formulate final agency action do not create a new point of entry. Accordingly, the Petition is dismissed without prejudice to amend. Petition to Intervene, filed September 8, 2010, Ex. A, at 2 of 8. The Department was aware that the Western Destin Project "because of its size, potential effect on the environment, potential effect on the public, controversial nature or location, is likely to have a heightened public concern or is likely to result in a request for administrative proceedings." Consolidated NOI, at 13 of 17. The Department therefore took pains to ensure that parties affected by the Western Destin Project would be provided notice of the Project and have an opportunity to timely assert their rights to challenge the permitting and authorization of the Project. The Consolidated NOI required publication within 30 days in the legal ad section of a newspaper of general circulation in the area a public notice of the Consolidated NOI. It also required proof of publication. The County complied on both counts. A notice was published on January 9, 2010, in the Destin Log, in Okaloosa County. The public notice specifically identified the project location as between reference monuments R-16.6 and R-25.5 in Okaloosa County, which includes the segment of the shoreline adjacent to the MACLA Intervenors Property. The Department also provided a detailed statement of the "Rights of Affected Parties," including their right to petition for an administrative hearing pursuant to sections 120.569 and 120.57 within 14 days of receipt of written notice of the Consolidated NOI. The point of entry into the administrative proceedings to challenge the Consolidated NOI, therefore, in the case of affected parties with notice by virtue of the publication on January 9, 2010, expired on January 23, 2010. The section of the Consolidated NOI that governed the rights of affected parties also warned: Because the administrative hearing process is designed to redetermine final agency action on the application, the filing of a petition for an administrative hearing may result in a modification of the permit or even a denial of the application. * * * The failure of any person to file a petition within the appropriate time period shall constitute a waiver of that person's right to request an administrative determination (hearing) under Sections 120.569 and 120.57, F.S. Consolidated NOI, at 14 of 17. The MACLA Intervenors read the Destin Log at least on occasion and communicated with counsel for the Oceania Petitioners. Some believed they were represented by counsel for the Oceania Petitioners and had contributed to legal fees incurred by the Oceania Petitioners. Despite the foregoing, the MACLA Petition to Intervene was granted (subject to proof of standing) on the basis that the MACLA Intervenors had shown good cause for the filing after the deadline imposed by rule 28-106.205. At the time a point of entry into administrative proceedings was provided by the combination of the Consolidated NOI in December of 2009 and publication in the Destin Log of the notice on January 9, 2010, the Draft JCP called for the applicant to provide a survey of a Pre-project MHWL rather than the establishment of an ECL. Neither notice of the Second Revised Draft JCP, filed on July 26, 2010, nor the Second Revised Draft JCP, itself provided a point of entry into formal administrative proceedings to parties whose substantial interest were at stake. A new substantial interest, however, had been injected into the proceedings by the Second Revised JCP. The Second Draft JCP requires the establishment of an ECL as a condition of the permit in lieu of provision of a survey of Pre-project MHWL. The MACLA Intervenors promptly sought a point of entry to contest what is plainly a drastic change in circumstances with significant consequences to the boundary of their properties toward the shoreline with the Gulf of Mexico. The effect of this change and the difficulty of keeping up with beach restoration activities in Okaloosa County, particularly for affected persons whose permanent residence is elsewhere, was demonstrated by the testimony of Louise Brooker, who lives in Amarillo, Texas. When asked "[w]hy did you wait until September of this year [2010] to file the intervention?," she testified: [O]ur group thought that we were being represented by the Oceania group . . . when I did find out [the JCP had been issued], it was after the 30-day period . . . I hadn't been reading the Destin Log every day because it's very difficult to do, and then it changed. * * * Then it made a huge difference between using the mean high water line * * * And then the ECL being established, which was the ECL that I do not agree with, then that was being put in the permit. So that changed things a great deal. (emphasis added). Tr. 1526-7. Once their petitions for formal administrative proceedings had been dismissed with prejudice by the Department (or in the case of the MACLA parties whose petitions for an administrative had not been dismissed yet but appeared likely to meet the same fate), the MACLA Intervenors promptly sought relief through filing the MACLA Petition to Intervene. When the petition to intervene of the MACLA Intervernors was opposed by the County and the Department, the placement of the substantial interest at stake in the proceeding of a fixed ECL as the southern boundary of their property by the Second Revised JCP and the quick action of the MACLA Intervenors in contesting in contesting it was viewed as good cause for the filing of their petition later than required by rule. The Other Parties Okaloosa County is a political subdivision of the State of Florida and the applicant for the JCP, the Variances and the SSL Authorization. The Department is the state agency responsible for administration of the state's regulatory authority as found in Part I of the Beach and Shore Preservation Act, chapter 161, Florida Statutes, and in particular, for the issuance of permits required by section 161.041 and the concurrent processing of "joint coastal permits" as allowed by section 161.055. It also serves as staff to the Board of Trustees of the Internal Improvement Fund and in that capacity handles the processing and issuance of SSL Authorizations. The Holiday Isle Intervenors are businesses and condominium associations, all of whose members own real property or conduct businesses along the segment of the beach to be restored by the Project. Their properties (unlike the Oceania property and the MACLA Intervenors' properties in the Project "gap" between R-22.6 and R-23.2) are along shoreline that has been designated by the state as critically eroded.15/ Critically Eroded Shoreline Florida Administrative Code Chapter 62B-36 governs the Beach Management Funding Assistance Program. It contains the following definition of "Critically Eroded Shoreline": "Critically Eroded Shoreline" is a segment of shoreline where natural processes or human activities have caused, or contributed to, erosion and recession of the beach and dune system to such a degree that upland development, recreational interests, wildlife habitat or important cultural resources are threatened or lost. Critically eroded shoreline may also include adjacent segments or gaps between identified critical erosion areas which, although they may be stable or slightly erosional now, their inclusion is necessary for continuity of management of the coastal system or for the design integrity of adjacent beach management projects. Fla. Admin. Code R. 62B-36.002(4), (the "Critically Eroded Shoreline Rule"). The Department determines whether upland development, recreational interests, wildlife habitat or cultural resources are threatened or lost based on a 25-year storm event. Consideration of the Project on this basis leads to the Project being broken into three segments: a segment from R-17 at the west end of the Project to roughly R-20.3 (the "Western Segment"); a segment roughly between R-20.3 and R-23.2 (the "Middle Segment"); and a segment roughly between R-23.2 and R-25.5 (the "Eastern Segment"). Mr. Clark described the impact of a 25-year storm event on the Western and Eastern Segments: [T]hose two areas, based on the evaluation and the projection of the impact of a 25-year storm event, which is a high frequency storm event, showed that there would be erosion through deflation of the beach profile and recession of the shoreline to such an extent that upland development and infrastructure would be threatened. Tr. 499. As for the Middle Segment, "the same evaluation did not show that the 25-year storm event would provide that same level of threat." Id. The Middle Segment, however, for the purposes of continuity of the management and design integrity, was also designated as Critically Eroded Shoreline and the entire stretch of shoreline, including all three segments, Western, Middle, and Eastern, was originally included in the Project.16/ The Project With the elimination of the Oceania Gap, the Project calls for the placement of 831,000 cubic yards or so17/ of beach- quality sand along 1.7 miles (less the 600 feet of the Oceania Gap) of shoreline within the City of Destin between reference monuments R-16.6 and R-22.6 and between R-23.2 and R-25.5. The Project is designed to restore the shoreline to conditions that existed before Hurricane Opal in 1995. The useful life of the Project is estimated to be eight years. The Project will restore beach along 32 separate parcels of property, 31 of which are privately owned. The exception is a small area of publicly owned beach at the extreme west end of the Project. The Project's Construction is intended to be facilitated by hopper dredge. The dredge excavates at a borrow site. A ship brings the excavated material to the beach fill site where it is discharged by pipe onto the beach. The pipeline runs perpendicular to the shore and extends about a quarter of a mile offshore. The contractor normally fences off a work zone that is about 500 feet wide. The work zone moves along the beach as construction progresses. "[I]n that work zone, there is a lot of heavy equipment that moves the sand around . . . looking at the Project . . . [from] an aerial view, roughly half the sand will be placed seaward and half the sand . . . landward of . . . [the] Mean High Water Line." Tr. 139. The Project's construction template or "the shape of the beach when it[']s constructed," id., consists of a dune, a back berm and a wide variable berm. The dune has an elevation of 8.5 feet and a crest width of 30 feet. The berm has an elevation of 5.5 feet. The width of the construction varies but averages about 200 feet. Over the first several months following the Project's construction, a calibration process takes place. About half of the berm erodes and deposits offshore in a near shore sand bar. "That near shore bar acts as a wave break . . . and dissipates wave energy during storms. So having a good healthy bar out there can definitely provide storm protection." Tr. 140. "Using "two to 250 feet a day,"18/ as a "good approximation for the progress . . . [in] constructing the"19/ Project, construction on any particular individual property should take between one or two days "depending on how . . . wide the property is and how fast the construction progresses." Tr. 141. A property along a lengthier segment of the beach, like the 600 feet at the seaward boundary of the Oceania Property had it remained a part of the Project, therefore, would take "two to three days." Tr. 142. Storm erosion models on the construction berm showed that the Project will provide protection from a fifty-year storm. Selection of the Sand Source: Borrow Area OK-A The engineers of the Project, ("Taylor Engineering," the "Project's Engineers" or the "Engineers") examined the Gulf's underwater expanse from Santa Rosa County to Walton County seaward to Federal waters. The search for a sand source included a reconnaissance phase and a detail phase investigation of geophysical and geotechnical data. After exhaustive study, two potential borrow areas were identified: a "far-shore" site and a "near-shore" site. The far-shore site is eight miles offshore and about a mile east of East Pass and is designated "OK-B." The near-shore site, three miles west of East Pass and centered about a mile and a quarter from the shores of the Okaloosa Island part of Santa Rosa Island, is designated "OK-A." With its edge within the designated Outstanding Florida Water boundary of the Gulf Islands National Seashore Park, it is within a relic ebb tidal delta in water depths of -36 to -51 feet, NGVD. Approximately 1.7 miles wide from east to west and approximately 0.9 miles wide north to south, it covers approximately 700 acres. At its landward-most side, it will be dredged to 10 feet into the existing bottom. Reference in documents of Taylor Engineering and the County to OK-A as the "near-shore site" does not mean it is located in the "nearshore" as that term is used in coastal geology. The coastal geologic term "nearshore" refers to the zone from the shoreline out to just beyond the wave breaking zone.20/ Borrow Area OK-A is well beyond the nearshore. It is clearly located "offshore," in "the relatively flat zone that is located from the surf breakers seaward out to the outer limits of the continental shelf."21/ Tr. 513. It is referred as the near- shore site by Taylor and the County to distinguish it from OK-B which is farther offshore and therefore was referred to as the "farshore site." The two sites, OK-A and OK-B, were selected for comparative review on three bases: sand quality; financial impact; and dredging impacts. Sand quality is "the number one criteri[on]." Tr. 143. It involves grain size, soil and shell content, and sand color. Financial impact is determined mainly by distance; the farther from the construction site, the more expensive to transport the sand. If the borrow area is close enough to shore, a Borrow Area Impact Analysis is conducted. An impact analysis was not conducted for OK-B. The Engineers assumed on the basis of its 8 miles distance from shore that it would not impact the shoreline in any way. The assumption was a reasonable one. Impacts to the shoreline or beach from the dredging of OK-B are unlikely.22/ A Borrow Area Impact Analysis was conducted of OK-A. The quality of the sand in OK-B was similar to that of OK-A but OK-A's "was slightly better." Tr. 144. The slight difference was not a significant factor in the determination that OK-A should be selected. The main factor in favor of OK-A was distance. Because it is so much closer to the Project than OK-B, use of OK-A "substantially reduces the cost of construction" id., compared to OK-B. Taylor Engineering (and ultimately the County) selected OK-A as the sand source. The selection process included a sand source investigation by Taylor. Taylor Engineers' final report on sand source was released in October of 2009. The report shows that in OK-A, the southeast corner of the area "seemed to contain a lesser quality sand than the borrow area as a whole and in terms of color." Tr. 145. Sand from the southeast corner of OK-A, nonetheless, was used in two beach restoration projects, both on Eglin Air Force Base property. Those projects were denominated A-3 and A-13.23/ The selection of OK-A was not upset by Taylor Engineering's OK-A Borrow Area Impact Analysis. Borrow Area Impact Analysis An Okaloosa County Sand Search Borrow Area Impact Analysis was prepared by Taylor Engineering for the Joint Coastal Permit Application and released in July of 2008. Aware that dredging the borrow site could affect both wave climate and current (the swift flow of water within a larger body of water), Taylor examined the impact of dredging the OK-A Borrow Area for those effects in the borrow area vicinity. The ultimate purpose of the Borrow Area Impact Analysis, however, was larger. It was to determine the changes to wave and current climate for impact to the beach, such as erosion. An increase in wave height, for example, would increase erosion. Two numerical modeling efforts were conducted. The first, called STWAVE, documents the impacts to wave climate. The second, ADCIRC, analyzes the effects of the dredging on currents. The STWAVE model requires wave characteristics as input. Taylor Engineering used "a 20-year hindcast of wave data from a WIS station located directly offshore in deep water. Under STWAVE modeling, impacts were examined for normal conditions and then 'under a 100-year storm condition.'" Tr. 149. The basis was the 100-year storm data from Hurricane Opal. The impacts of bottom friction were ignored, a common practice in applications like the County's JCP application that involves work on the open coast with a uniform sandy bottom. As Mr. Trudnak put it: Tr. 150. When you use . . . wave monitoring devices, you're trying to calibrate a model for the effects of bottom friction. And when the borrow area is this close to shore [as in the case of OK-A], . . . the propagation of distance of the waves is relatively short. And when you have a uniform sandy bottom you don't expect the impacts of bottom friction to be significant. So . . . in applications like [Okaloosa County's for the Western Destin Project], you ignore the effects of bottom friction. The analysis assumed that all of the sand in the borrow area would be removed when, in contrast, "the borrow site usually contains 50 percent more sand than what the Project requires on the beach." Tr. 152. In the case of OK-A, it is intended to serve the Eglin Air Force Base Project, the Okaloosa Island Project and the Western Destin Project. These projects require 4.7 million cubic yards of sand of the nearly 7 million cubic yards of sand available in OK-A. The impact analysis, therefore, was conservative in that it predicted more impact than would actually occur because significantly less sand would be removed from the site than was factored into the STWAVE modeling. With regard to normal conditions, the STWAVE modeling led to the conclusion that impacts from the permitted activities associated with the borrow area would be negligible. Under storm wave conditions, the STWAVE modeling showed "a certain wave angle or direction that increased the wave height." Tr. 151. The increase in wave height, however, was far enough offshore so as to never affect the "actual breaking wave height on the beach." Id. The modeling results enabled Taylor Engineering to conclude "that the borrow area did not have a potential to cause any impacts whatsoever." Tr. 152. ADCIRC is a state-of-the art hydrodynamic model that simulates tidal currents. Taylor Engineering conducted the ADCIRC modeling to analyze effects on the tidal currents and circulation in and around East Pass that would be caused by dredging the borrow area. Just as in the case of STWAVE, ADCIRC modeling showed that the impact of dredging the borrow area would be negligible whether in normal or "storm" conditions. The Application Coastal Construction Permits and CCCL Permits The Application was processed as one for a joint coastal permit (a "coastal construction" permit under section 161.041). It was not processed as an application for a coastal construction control line ("CCCL") permit. Section 161.041 (the "Shore Protection Statute") and chapter 62B-41 apply to JCPs. Section 161.053 (the "CCCL Statute") and chapter 62B-33 govern CCCL permits. The Department treats its JCP and CCCL permitting programs as independent from each other and as mutually exclusive permitting programs. A project that involves "beaches and shores" construction is permitted under one permitting program or the other but not under both permitting programs. See Tr. 424-5. Indeed, when it comes to beach restoration projects (or "shore protection" projects) such as the Western Destin Project, section 161.053 of the CCCL Statute provides as follows in subsection (9): "The provisions of this section do not apply to structures intended for shore protection purposes which are regulated by s. 161.041 [the Shore Protection Statute] " The Department interprets section 161.053(9) to exempt the Project from CCCL statutory requirements and the rules that implement the CCCL Statutes so that the only permit the Project requires, in the Department's view, is a JCP. b. The "Written Authorization" Provision Chapter 62B-14 is entitled "Rules and Procedures for Applications for Coastal Construction Permits." The Shore Protection Statutes serves as rule-making authority for every rule in 62B-41. Every rule in the chapter, moreover, implements, among other provisions, one provision or another of the Shore Protection Statute. Rule 62B-41.008 derives its rule-making authority from the Shore Protection Statute and section 161.055(1) and (2). Among the statutory provisions it implements are four subsections of the statute: (1), (2), (3) and (4). Section (1) of rule 62B-41.008 provides, in pertinent part, as follows: A Joint Coastal Permit is required in order to conduct any coastal construction activities in Florida. A person required to obtain a joint coastal permit shall submit an application to the Department . . . The permit application form, entitled "Joint Application for Joint Coastal Permit, Authorization to Use Sovereign Submerged Lands, Federal Dredge and Fill Permit" . . . is hereby incorporated by reference . . . . The application shall contain the following specific information: * * * (c) Written evidence of ownership of any property which will be used in carrying out the project, or authorization for such use from the property owner which is upland of mean high-water, or below mean high water but not sovereign land of the State of Florida. * * * (n) Written authorization for any duly- authorized member of the Department staff to enter upon any property to be used in carrying out the project, for the purpose of evaluating site conditions prior to final processing of the permit application. (emphasis added). Rule 62B-41.008(2) (the "Waiver Provision") lists requirements of rule 62B-41.008(1) which are to be waived by the Department under circumstances described in the Waiver Provision: "Any of the requirements contained in paragraph 62B-41.008(1)(f), (h), (i), (j), (k), (l), or (m), F.A.C., will be waived if the Department determined that the information is unnecessary for a proper evaluation of the proposed work." In its list of requirements that will be waived under certain circumstance, the Waiver Provision does not include paragraphs (c) or (n). The Application did not contain the "specific information" detailed in paragraphs (c) and (n) of rule 62B- 41.008(1). It did not contain written proof of ownership of any property that will be used in carrying out the Project nor did it contain authorization for such use from the property owner upland of mean high-water, information required by paragraph (c). It did not contain written authorization for any duly-authorized member of the Department staff to enter upon any private property to be used in carrying out the Project for the purpose of evaluating the site conditions prior to final processing of the permit application, information detailed in paragraph (n). As of the dates of final hearing, the County had not provided the Department with any written authorizations from the owners of the 31 privately-owned properties within the Project area, including the MACLA intervenors. As part of the Application, however, the County requested a waiver of the requirements related to authorizations. A waiver was requested under number 14 of the Application. It provides: Satisfactory evidence demonstrating that the applicant has sufficient control and interest in the riparian upland property, as described in Section 18-21.004(3)(b), Florida Administrative Code. Governmental entities that qualify for the waiver of deferral outlined in this rule must provide supporting documentation in order to be eligible. If the applicant is not the property owner, then authorization from property owner for such use must be provided. Joint Ex. 1, at 3 of 9. The County, through its agent, Taylor Engineering, responded to number 14 of the Application as follows: Response: The applicants request a waiver of the requested information under Rule 18- 21.004(3)(b), which grants an exception to the upland interest requirement for restoration and enhancement (e.g. nourishment) activities conducted by a government agency. According to Rule 18- 21.004(3)(b), satisfactory evidence of sufficient upland interest is not required for the proposed activity, because the proposed offshore borrow area is not riparian to uplands and the beach fill activities will not unreasonably infringe on riparian rights. Joint Ex. 1, Attachment A, at 3rd un-numbered page. Rule chapter 18-21 governs Sovereignty Submerged Lands Management. Rule 18-21.004(3)(b) ("the Upland Interest and Riparian Rights Rule") provides as follows: (3) Riparian rights. * * * (b) Satisfactory evidence of sufficient upland interest is required for activities on sovereign submerged land riparian to uplands, unless otherwise specified in this chapter. * * * Satisfactory evidence of sufficient upland interest is not required . . . when a governmental entity conducts restoration and enhancement activities, provided that such activities do not unreasonably infringe on riparian rights. (emphasis added). Item number 18 of the Application calls for signatures related to "any proprietary authorizations identified above," such as those identified in item number 14. Consistent with the request for a waiver from providing the requested information with regard to satisfactory evidence demonstrating sufficient control and interest in the riparian upland property, no signatures were provided by the County or its agent. Rule 62B-49.003(3), entitled "Policy" provides: Any application submitted pursuant to this chapter shall not be deemed complete, and the timeframe for approval or denial shall not commence until the Department has received all information required for: a coastal construction permit under Section 161.041, F.S., and Chapter 62B-41, F.A.C.; an environmental resource permit under Part IV of Chapter 373, F.S., and Title 62, F.A.C.; and a proprietary authorization, under Chapter 253, F.S., and Chapters 18-18, 18-20 and 18-21, F.A.C. See the material bound and attached to the Request for Official Recognition filed August 2, 2010, Tab "Chapter 69B-49, F.A.C." The Department deemed the Application complete on December 30, 2009. Amendment of the JCP re: Written Authorizations The petition for formal administrative hearing filed in Case No. 10-0516 challenged the Consolidated NOI on the bases, inter alia, that the Application had failed to "provide 'sufficient evidence of ownership' as defined in rule 62B- 33.008(3)(c), F.A.C., to be a proper applicant for the Permit"24/ and that the County had not "provided satisfactory evidence of sufficient upland interest to be entitled to a letter of consent to use sovereign submerged lands."25/ To support their allegation that the County is not a proper applicant for the JCP, the Oceania Petitioners amended their petition on July 13, 2010, to add the following: The County must provide the Department "[w]ritten evidence of ownership of any property which will be used in carrying out the project, or authorization for such use from the property owner which is upland of mean high-water, or below mean high-water but not sovereign land of the State of Florida", as required by [paragraph (c) of the JCP Application Specific Information Rule]. The Department must receive "[w]ritten authorization for any duly-authorized member of the Department staff to enter upon any property to be used in carrying out the project, for the purpose of evaluating site conditions prior to final processing of the permit application", as required by Rule 62B- 41.008)1)(n), F.A.C. The Amendment was made despite the existence in all of the versions of the Draft JCP, the original version and the revised versions, of General Condition Six: This permit does not convey to the Permittee or create in the Permitee any property right, or any interest in real property, nor does it authorize any entrance upon or activities on property which is not owned or controlled by the Permittee. The issuance of this permit does not convey any vested rights or any exclusive privileges. Joint Ex. III at Tab 9 at 4 of 26. With the filing of the Oceania Petitioners' Second Amended Complaint in Case No. 10-0516, the issues appeared to be fully joined. Before the case proceeded to hearing, however, the County voted to remove the Oceania Property from the Project (see paragraphs 31 and 32, above). The vote led to a formal request from the County to DEP to revise the Project and a revision by the Department of the Project's drawings and the Draft JCP (the "First Revised Draft JCP"), notice of which was filed on July 23, 2010. The revisions to the Draft JCP necessitated by the elimination of the Oceania property from the Project was not the only revision made to the Draft JCP as noticed on July 23, 2010. The Department also revised the Draft JCP's Specific Condition 5. This latter revision prompted the Sherry Petitioners to file a petition for an administrative determination concerning un- adopted rules. DOAH assigned the petition Case No. 10-6205RU. During the final hearing, the Department revised the Draft JCP a second time (the "Second Revised Draft JCP".) The second revision inspired the MACLA Petitioners' petition to intervene. Just as with the Sherry Petitioners, the revision to Specific Condition 5 prompted the MACLA Petitioners to petition for an administrative determination concerning un-adopted rules. DOAH assigned this second un-adopted rule challenge to Specific Condition 5 Case No. 10-8197RU. Case Nos. 10-6205RU and 10-8197RU In general, the revision to the Draft JCP's Specific Condition 5 advised the County that no beach restoration work can be performed on private upland property unless authorization from the owner of the property has been obtained and submitted to the Department ("the Upland Property Authorization Requirement"). The revision also provided an exception to the Upland Property Authorization Requirement: the County could submit an authorization from a court of competent jurisdiction that such an authorization is not required. Case Nos. 10-06205RU and 10-8197RU were heard at the same time as these consolidated cases.26/ A final order was issued with regard to the two cases on November 4, 2010. The final order dismissed the case because the Sherry Petitioners and the MACLA Petitioners had not demonstrated that they would be "substantially affected" by Specific Condition 5 as required by section 120.56(3) for a party to have standing to challenge an agency statement that constitutes a rule which has not been adopted pursuant to the rule-making procedures found in section 120.54(1)(a). Case Nos. 10-6205RU and 10-8197RU were two of three petitions seeking administrative petitions concerning un-adopted rules that were consolidated and heard with the consolidated cases subject to this Recommended Order. The third was a case that had been filed by the Oceania Petitioners earlier in the proceeding: Case No. 10-5384RU. Case No. 10-5384RU Case No. 10-5384RU was filed by the Oceania Petitioners in order to challenge as an un-adopted rule Specific Condition 1 as it appeared in the Original Draft JCP ("Original Specific Condition 1"). Original Specific Condition 1 contained several requirements. In general, it required the County to record a certificate before the commencement of construction associated with the Western Destin Project. The certificate was required to describe all upland properties along the shoreline of the Project. The certificate was also required to be accompanied by a survey of a pre-project mean high water line (the "Pre-project MHWL) along the entire length of the Project's shoreline. The case claimed that the Department had made another statement that constituted an un-adopted rule which violated the rule-making provisions of chapter 120: "that an Erosion Control Line (the 'ECL') is not required to be established pursuant to Section 161.161, Florida Statutes, for a beach restoration project unless 'state funds' are used for the construction (as opposed to just the design) of a beach restoration project." Case No. 10-5384RU, Petition for an Administrative Determination Concerning Unadopted Rules, at 2. During the course of the final hearing, however, the Department filed a notice of a set of revisions to the First Revised Draft JCP. These revisions (the "Second Revised Draft JCP") included a revision of Specific Condition 1. The Second Revised Draft JCP The notice by the Department that alerted the parties to the Second Revised Draft JCP was filed on August 18, 2010. The August 18, 2010, Notice contains two changes to the First Revised Draft JCP. The first change deletes entirely the existing language in Original Specific Condition 1 (the language challenged in Case No. 10-5384RU). It substitutes the following language: Prior to construction of the beach restoration project, the Board of Trustees will establish an Erosion Control Line along the shoreline of the beach restoration project. The Erosion Control Line shall be established consistent with the provisions of ss. 161.141-161.211, Florida Statutes. An Erosion Control Line shall not be established in conjunction with this joint coastal permit with respect to the shoreline seaward of the Oceania Owner's [sic] Association, Inc. members' common elements property. In lieu of conducting a survey, the Board of Trustees may accept and approve a survey as initiated, conducted, and submitted by Okaloosa County if said survey is made in conformity with the appropriate principles set forth in ss. 161.141-161.211. Department of Environmental Protection's and Board of Trustees of the Internal Improvement Fund's Notice of Revisions to the Proposed Joint Coastal Construction Permit, page 3 of 4. Thus, the first change noticed by the Department on August 18 deleted the requirement that the County submit a survey of a Pre-project MHWL. It requires, instead, that the county establish an ECL consistent with applicable statutory provisions. The second change was made with respect to Specific Condition 4(c) of the First Revised Draft JCP, which lists items to be submitted to the Department for approval prior to the commencement of construction and the issuance of a Notice to Proceed (with construction) by the Department. The existing language was deleted in its entirety and the following language was substituted: Id. Written documentation that the Erosion Control Line required by Special Condition Number 1 has been filed in the public records of Okaloosa County. Disposition of Case No. 10-5384RU The same Final Order that disposed of Case Nos. 10- 6205RU and 10-8197RU disposed of Case No. 10-5384RU. The Petitioners in Case No. 10-5384RU were found to lack standing to challenge Original Specific Condition 1 and the petition that initiated the case was dismissed. In addition, the Final Order concluded that had the Petitioners had standing to bring the challenge, the case would still have been decided in favor of the Department. This conclusion was based on the remedy called for by section 120.57(1)(e).27/ That remedy was found to have been achieved when the Department changed Specific Condition 1 to require an ECL rather than a Pre-project MHWL. See Final Order, Case No. 10- 5384RU (DOAH November 4, 2010). In addition to the record made with regard to the three rule challenges during the final hearing on the Sherry and Oceania Petitions, most of the rest of the evidence at the final hearing concerned the application of the regulatory authority of the Department and the Board of Trustees found in the Florida Statutes and the Florida Administrative Code, especially the environmental impacts of the Project as permitted by the Second Revised Draft JCP and as authorized under the Variance and the Sovereign Submerged Lands Use Authorization. Impacts The depth of OK-A should not exceed -49.4 feet, NGVD in an area where the depth of the ocean bottom is roughly -40 feet, NGVD. The excavation of the borrow site is designed in two dredging phases. The first phase, anticipated to provide up to 116 percent of the sand needed by the Project, is designed to a depth of 47.4 feet. "If for some reason, the contractor needs more sand . . ., then he can move into Phase II . . . [at a depth] of minus 47.4 to minus 49.4 feet [NGVD]. . . [,] a two foot deep layer throughout the entire borrow area." Tr. 165. OK-A is relatively wide, at least as compared to an existing borrow area not far away, the borrow area used for beach restoration in western Walton County and eastern Okaloosa County east of the City of Destin (the "Walton Borrow Area"). It is also a shallow borrow area when its depth is measured from the Gulf floor. It is in deeper water than the Walton Borrow Area. These factors make it less likely to cause impacts to the beach than the Walton Borrow Area.28/ Despite the width of OK-A, its relative shallowness measured from the Gulf floor, and its water depth, Dr. Dally, on behalf of the Petitioners, challenged the Taylor Engineering conclusion that there would be no impacts to the beach from the dredging of Borrow Area OK-A. The challenge from Dr. Dally, however, did not detail what the impacts would be or how serious they would be. Instead, Dr. Dally concluded that "not nearly enough study has been conducted of the proposed borrow area to ascertain that there will be no adverse impacts." Tr. 633. Dr. Dally's challenge to the conclusion by Taylor Engineering of no impacts to the beach from an excavated OK-A begins with an explanation in general of wave dynamics, sediment transport, and borrow site impacts. Wave Dynamics, Littoral Sediment Transport, and Borrow Site Impacts, Generally General Wave Dynamics "[W]aves in very deep water will start to turn and become more shore parallel in the case of Okaloosa County." Tr. 636. As they approach shore, a dynamic process of shoaling and refraction occurs. The waves may also become involved with diffraction. Shoaling is a growth in height from interaction with the shallow bottom or a shoal. Refraction is a process of alignment of waves with bottom contours. Diffraction is a spreading of waves or the bending of waves or change in wave direction after interaction with emergent structures or submerged features. As the process of shoaling, refraction and diffraction takes place, waves may be affected by bottom friction, depending on ocean bottom conditions. Dr. Dally offered the following description of wave changes as they close in on the face of the beach and approach interaction with the shoreline. The description includes the potential impacts of an excavated OK-A on the beaches and shores of Okaloosa Island adjacent to the Surf Dweller and El Matador condominium property: As they pass into the very nearshore . . . they, of course, grow in height. They then break . . . [or] [s]ometimes, as they pass over a [sand]bar, they'll stop breaking. And then begin breaking again when they get right up onto the beach face. Any time you put a bathymetric feature [such as a borrow area] into that otherwise natural system, you affect the wave transformation due to processes dependent upon the character of the perturbation . . . * * * Wave reflection from abrupt bathymetric changes. . . in this case, the landward most . . . notch of the borrow area would be a reflective surface . . . when something has perturbed the wave field like that, defraction [sic] becomes an important process. So, as the waves pass over this proposed borrow area and, especially, over the 10-foot or greater vertical face, they will reflect and begin defraction [sic] so that it becomes a . . . complicated wave field . . . . Tr. 636-7. In addition to the perturbation caused by the borrow area there is another factor at work that has the potential to affect the beach along the condominium properties owned by the Sherry Petitioners: sediment transport. Sediment Transport "Sand can move along or away from the beach in two ways." Tr. 1141. It can move along the shoreline or it can move offshore. Littoral transport of sediment, a factor important to erosion and accretion, is the movement of sediment, mostly sand, along or parallel to shore. It is caused by the intersection of waves that come ashore at an angle to the shoreline, rather than those that break straight onto the beach. The average net long-term littoral transport in the area of the Project and Okaloosa Island is east to west. The Sherrys and Mr. Donovan Petitioners own property down-drift from the OK-A site, or to the west. Dr. Young described the beaches down-drift of OK-A at hearing: "[t]hose beaches have, over the . . . last decade or so, been generally stable to accreting. There's a pretty nice beach out there right now." Tr. 1143. This area of the Okaloosa County's beaches and shores is the area most likely to be affected by an excavated OK- A if there are, in fact, any impacts to beaches and shores caused by the dredging of the borrow site. Borrow Site Impacts Two processes affecting waves in the Gulf would occur above an excavated OK-A Borrow Area. The first wave process would be "that part of the wave energy will actually reflect and go back out to sea," tr. 640, in essence, a scattering effect of the energy. Diffraction at the same time would cause the waves to radiate outwards from the borrow area rather than the waves going straight back out to sea. The second wave process creates the potential for the waves to become "very, very, complicated." Tr. 640. They could "trip", that is, the notch in the borrow area could break the waves. "[B]rag scattering" (tr. 641) could make the waves deteriorate into shorter period waves. If there are changes in waves, tide level or current, changes will be caused to the beach. As Dr. Dally succinctly put it at hearing, "[the beach] might erode, it might accrete, it might do both," tr. 641, by virtue of the presence of an excavated OK-A Borrow Area. If the impact of the excavation of the borrow area were to create shorter period waves, the result generally would be erosion. If the impact created longer period waves which generate water movement deep into the water column the result generally would be accretion. The borrow area has the potential in Dr. Dally's opinion to create both longer and shorter period waves. Wave angle of the waves breaking on the beach also is a factor in beach impacts. But Dr. Dally was unable to predict the impacts of the excavation of OK-A to Okaloosa Island beaches and shores without more study, data and analysis as to what effects a dredged OK-A would have on wave period and wave angle and the concomitant sediment transport. Just as Mr. Trudnak, Mr. Clark concluded that OK-A is too far offshore to cause adverse impacts to the beach. If, however, the Project were to utilize a borrow area along the same stretch of the beach but much closer to shore as in the case of the Anna Maria Island Project in which the borrow area was only 1000 feet from the shoreline, erosion impacts could occur on part of the beach. Beneficial impacts in such a case would occur to the beach downdrift of the borrow area. In the Anna Maria Island Project, beaches far enough to the south which were downdrift of the borrow area accreted. The impact to the Sherry and Donovan Properties, both being downdrift of a borrow area located along the same stretch of beach but within 1000 feet of shore and closer in than OK-A, would likely be beneficial. The area of shoreline that would be affected by wave impacts from an excavated OK-A is larger than the area in the immediate shadow zone of the borrow site, that is, a shadow zone perpendicular from the borrow site to the shore. The area affected by wave impacts depends on the angle of the waves. In the Destin area and along Okaloosa Island where the Sherry Petitioners reside, the waves come ashore predominately out of the east. If the waves come ashore along Okaloosa Island at a strongly oblique angle (more directly from the east), "the shadow zone now stretches further to the west and the diffraction pattern . . . increases the size of the shadow zone," tr. 680, to a size much larger "than the actual shadow zone of the . . . borrow area." Id. Along these same lines, if there are impacts to the beach caused by a dredged OK-A, the impacts should be greater the closer the beach is to the footprint of a dredged OK-A. Given the predominate tendency of the waves to come from the east along Okaloosa Island, if the beaches alongside both the Surf Dweller Property and the El Matador Property are affected, the beach alongside the Surf Dweller Property will incur the greater impact. Likewise, if beach impacts are incurred by beach alongside only one property or the other, it is much more likely that the beach alongside the Surf Dweller Property will be affected than the beach alongside the El Matador Property. Distance of an offshore borrow area from the shore is critical to the effect of the borrow area on diffraction and wave dynamics. If the borrow area is far off shore, as in the case of the alternative, potential borrow site identified by Taylor Engineering, OK-B, then, as explained by Dr. Dally, diffraction "has a lot of time and a lot of opportunity to smooth the waves out once again and things become uniform when they hit the beach." Tr. 645. A borrow area that is closer to the beach has higher potential for creating impacts. Dr. Dally again: "[I]f you move the borrow area closer to the beach, you have this scattering pattern induced by the reflection and the diffraction and refraction that doesn't have time to smooth itself out. And that's when you can really cause impacts to the beach, both accretive and erosive impacts." Id. (emphasis added). The underscored sentence from Dr. Dally's testimony quoted in the previous paragraph was directly addressed in the County's case through Mr. Trudnak's determination that OK-A, although not as far away as OK-B, is far enough away from the beach that it will not cause adverse impacts to the beach. Again, Dr. Dally's testimony, despite the underscored testimony in the previous paragraph, is not that OK-A will, in fact, cause impacts to the beach. His testimony, rather, is the equivalent of a statement that the closer a borrow area is to the beach the more likely that it will have impacts to the beach and that at some point, a borrow area, will be so close to the beach, that adverse impacts will occur. The fact that OK-A is much closer to the beach than OK-B does not mean that an excavated OK-A will cause impacts to the beach. Impacts of an excavated OK-A depend upon OK-A's actual distance from the beach rather than OK-A's distance relative to OK-B's distance. Thus, while it may be determined that the likelihood of impacts to the beach is greater in the case of OK-A than in the case of OK-B, actual impacts from OK-A to the beach (as far as the effect of distance) is a function of OK-A's actual distance from the beach without regard to OK-B's distance from the beach. In addition to Dr. Dally's certitude that there will be impacts to the beach by virtue of the presence of a dredged OK-A, Dr. Dally also took issue with the method by which Taylor Engineering reached the conclusion of no impacts in the OK-A Borrow Area Impact Analysis Report. The OK-A Borrow Area Impact Analysis Generally Mr. Trudnak was part of the Taylor Engineering team that prepared the Borrow Area Impact Analysis Report. Mr. Trudnak was not the only expert to defend the report's conclusion of no impact to the beach. The report was reviewed by Mr. Clark, the Department's expert, who also opined that there would be no impacts. Mr. Clark relied on more than the report for his opinion. He also relied on his extensive experience with beach restoration projects and monitoring data for those projects and visual observation of those projects post-construction. The only numerical data analysis specific to the excavation of the OK-A Borrow Area, however, that the Department used in determining that excavation of OK-A would not have any adverse impacts to the shoreline and coastal systems of Okaloosa Island was the Taylor Engineering OK-A Borrow Area Impact Analysis Report. The Report described its evaluative efforts: [T]his report evaluates two potential dredging templates in terms of their impacts on wave and tidal current patterns during normal and extreme conditions. The evaluation requires analysis of the wave climate and tidal currents before and after the borrow area dredging. The analysis required a balance between minimizing impacts to wave climate and current patterns, and providing acceptable nourishment volumes. STWAVE (Steady-State Spectral Wave Model) simulated normal (average) and extreme (100- year (yr) storm) waves propagating over the baseline and post-dredging bathymetries. ADCIRC hydrodynamic modeling simulated tidal flow over the baseline and post-dredging bathymetries for normal (spring) and extreme (100-yr storm) tide conditions. A comparison of the baseline and post dredging model results established the effects of borrow area dredging on the neighboring shorelines (Destin and Eglin AFB) and the inlet. County Ex. 1, Okaloosa County Sand Search Borrow Area Impact Analysis, at 6. Thus, the STWAVE modeling conducted by Taylor as part of the analysis attempted to simulate normal (average) and extreme (100-year storm) waves propagating over the baseline and post-dredging bathymetrics. Taylor Engineering relied on WIS (Wave Information Study) results in performing its STWAVE modeling. WIS data is not measured wave data. Instead, it consists of numerical information generated by specific stations in wind fields in various locations around the Gulf of Mexico. The data is then placed in a model coded to represent the entire Gulf. The WIS station from which data was collected by Taylor Engineering is located approximately 10 miles offshore where the depth is approximately 85 feet. It would have been preferable to have used comprehensive field measurement, that is, data obtained from wave gauges on both sides of the borrow area over enough time to support use of the data, rather than WIS data. Comprehensive field measurement would have produced much more information from which to predict impacts to the beach. As Dr. Dally explained, however, If you don't have [field measurement data], then . . . especially over the long-term . . . a year or more [or] if you're analyzing your beach profile data over a 10 year period, you would like to have . . . wave data to accompany that 10 year period. Generally we don’t and that's when we start relying on models to fill in this missing information. Tr. 645-6 (emphasis added). This testimony was consistent with Mr. Trudnak's testimony: the problem with field measurement is that "the useful data that you [get] from [field measurement] gauges is . . . limited to [the] deployment period." Tr. 1234. It is not practical to take 10 years' worth of field measurement. As Mr. Trudnak explained: Typically, you would install those gauges for . . . a month or a couple of months . . . you want to use representative conditions . . . you try to pick a winter month and a summer month so you can try to capture those extremes and wave conditions. * * * [W]hen you . . . install those gauges in the field, you have no idea what those conditions are going to be during your deployment period. You can install your wave gauge for a month in the winter but that can be an unusually calm month, it could be an unusually severe month. So, it's really hit or miss, whether you . . . capture representative conditions. Id. (emphasis added). The WIS information utilized is hind-casted. Hind- casting is a method for developing deepwater WIS data using historic weather information to drive numerical models. The result is a simulated wave record. The WIS information utilized includes 20 years of hind-cast information. The purpose of using such a lengthy period of information is that it ensures that representative conditions are captured in the data for purpose of the analysis. Such "lengthy period" information overcomes the concern that there is not enough data to capture representative conditions as in the case of typical field measurement data. For its extreme STWAVE modeling, Taylor relied on WIS information generated during Hurricane Opal in 1995. Analysis of the model results showed negligible impacts on wave height under normal conditions and increased wave height during extreme conditions. Increased wave height during extreme conditions, however, was no closer than 300 feet from the shoreline. The increased wave height and wave angle in storm conditions were far enough offshore that they "never impacted the actual breaking wave height on the beach." Tr. 151. The model's prediction of no impacts in wave height on the shoreline due to a dredged OK-A and no change in sediment transport rate by virtue of the presence of a dredged OK-A led Taylor Engineering to conclude that whether in normal or extreme conditions, a dredged OK-A Borrow Area would not cause impacts to the beaches and shores of Okaloosa County. Criticisms of Taylor's STWAVE Modeling Dr. Dally offered four basic criticisms of Taylor Engineering's STWAVE Modeling: a) the model did not account for wave transformation processes caused by bottom friction between the WIS Station (10 miles out in the Gulf) and the OK-A site; b) the model was not calibrated or verified; c) the model did not sufficiently account for wave transformation impacts from the dredging of Site OK-A; and d) Taylor did not plot wave direction results from its STWAVE models or conduct any sediment transport analysis. Mr. Trudnak offered refutations of the criticisms. For example, taking the first of them, wave transformation processes caused by bottom friction between the WIS Station and the OK-A site were not accounted for by Taylor Engineering in its analysis because "most of that distance [between the WIS Station and the OK-A site] is deep water, meaning the waves aren't . . . feeling the bottom so they're not being affected by the bottom friction." Tr. 1236. The refutations were not entirely successful. The second of Petitioners' experts, Dr. Young cast doubt on the validity of all modeling no matter how well any particular modeling activity might meet the criticisms leveled by Dr. Dally against Taylor Engineering's effort. Dr. Young accepted Dr. Dally's testimony about why Taylor Engineering's modeling were not sufficient to support an opinion of "no impacts", but he differed with Dr. Dally as to whether coastal engineering models should be utilized to predict impacts to beaches.29/ See Tr. 1157. Dr. Dally believes in the benefits of modeling as long as the modeling is conducted properly. Dr. Young does not. It is his opinion that no model produces a projection that is precisely accurate but the essence of his criticism is that "we don't know how wrong the models are." Tr. 1159. Models are "incapable of quantifying the uncertainty or how right or wrong that they might be." Id. With regard to the modeling used in Taylor's Borrow Area Impact Analysis, Dr. Young summed up: [W]hen we do this model run, especially with a model that isn't calibrated or verified, we get an answer . . . it's not precisely the right answer, but . . . nobody knows how wrong the answer is. I don't know it, Mr. Trudnak doesn't know and Mr. Clark doesn't know. And that's why being prudent is important and why relying on the monitoring data is critical because the monitoring data is real data. Tr. 1160. In contrast to Dr. Young, Dr. Dally, consistent with his faith in models appropriate for the investigation and conducted properly, took another tack in attacking the modeling used by Taylor Engineering. He criticized Taylor Engineering's failure to use a more comprehensive wave transformation model: the Boussinesq Model. Dr. Dally opined that the Boussinesq Model was superior to STWAVE principally because it takes diffraction into account. But Petitioners did not produce any off-shore Borrow Area Impacts Analyses which used the Boussinesq Model, and Mr. Trudnak testified that he was unaware of any.30/ Taylor Engineering used STWAVE and not Boussinesq as the model for the Borrow Area Impact Analysis because the Boussinesq Model is typically used where diffraction plays the dominant role, that is, within areas like inlets or ports which have structures that will cause wave perturbation. The open coast is not such an area, making the STWAVE Model, if not more appropriate than the Boussinesq Model, certainly an acceptable model under the Project's circumstances. When asked about the Bousinessq modeling's application in the context of his testimony that he could not say what would be the impacts of the dredging of the OK-A Borrow Area, their extent or whether they would be adverse, Dr. Dally testified that based on his experience (rather than actual testing or modeling the impacts of OK-A as done by Taylor), he was "almost certain," tr. 691, that Bousinessq modeling would show impacts to the beach adjacent to the Surf Dweller and El Matador Properties that could be a "type of accretion . . . [that is] momentary . . . due to the propagation of these features as they go up and down the beach." Id. This statement is consistent with Mr. Clark's opinion that if the Project's borrow area were within 1000 feet of shore, the impact of dredging OK-A to the Sherry and Donovan Properties would be beneficial. When asked if the beaches would develop scalloping (sand erosion in some areas and accretion in others), Dr. Dally said, "Right. This [wave transformation process caused by an excavated OK-A borrow area] makes a scalloping." Tr. 692. Perhaps the dredging of Borrow Area OK-A would aggravate scalloping along the shores of Okaloosa County but they would not create scalloping of an "un-scalloped" coastal system. Scalloping features in the Okaloosa Island portion of Santa Rosa Island existed at the time of final hearing. In short, Dr. Dally roundly criticized Taylor Engineering's STWAVE modeling. As to the impacts he was sure would occur, he was unable to state whether they would be adverse, beneficial or both. Most importantly to the weight to be assigned his testimony, he was unable to testify as to how significant the impacts would be; one cannot determine from his testimony whether the impacts will be entirely de minimus, see rule 62B-41.002(19)(c) or whether some could be significant, see rule 62B-41.002(19)(a). Dr. Dally's testimony with regard to the creation by the Project of scalloping did not indicate the significance of that scalloping to the coastal system of Okaloosa County, a system whose ocean bottom, beaches and shores already contain scalloped features. Suppositive impacts that would be caused by the Project to the beaches of Okaloosa County were not the only attack by Petitioners. They also challenged the impact analysis on the basis of the opinion that adverse impacts had been caused to beaches by another beach restoration project and its borrow area not far away: the Walton Project. The Walton Project and Its Borrow Area Completed in the late spring of 2007, the Walton Project placed sand dredged from the Walton Borrow Area on approximately 7 miles of beach in eastern Okaloosa County (East Destin) and western Walton County. Just as in the case of the Western Destin Project, Taylor Engineering performed a borrow site impact analysis for the borrow site used in the Walton Project. Location and Comparison to the OK-A Borrow Area The northwest corner of the Walton Borrow Area is roughly 2.75 miles from the northernmost point of the western boundary of the OK-A Borrow Site. See Ex. P-13. The area between the easternmost point of the OK-A Borrow site and the westernmost point of the Walton Borrow Area, therefore, is roughly half that distance or 1.375 miles. The northwest corner of the Walton Borrow Area is approximately 0.8 miles offshore; its easternmost point is roughly one-half mile off-shore. Comparison of the Walton Borrow Area and OK-A shows that OK-A is larger and will have more sand removed. It is also wider, shallow when measured from the Gulf floor, and in deeper water than the Walton Borrow Area. Nonetheless, Petitioners characterize the two borrow sites as similar,31/ mainly because with less than 1.5 miles separating them, they are relatively close to each other. Despite proximity, there are significant differences, however, between the two. A wider, less deeply dredged borrow area would have less impacts than one deeper and narrower. OK- A's location in deeper water makes it less likely to affect waves and current than the Walton Borrow Area. The footprints of the borrow areas are dissimilar. The Walton Borrow Area has an irregular shape. OK-A is in the shape of a rectangle with a uniform dredging depth although "the depth of sand that is dredged will taper off . . . further offshore . . .[s]o that the seaward most edge does not have significant thickness of sand. The maximum cut is towards the northern boundary." Tr. 306. In addition to distance from shore, the predominately significant difference between the two is the presence on the Gulf floor in the vicinity of the Walton Borrow Area of an ebb shoal: a large deposit of sediment. The ebb shoal exists because of interaction between East Pass and the waves, tides and currents of the Gulf. The Walton Borrow Area is "close to the East Pass ebb shoal . . . and it included the outer flanks of the ebb shoal." Tr. 155. It makes the littoral zone for the Walton Project more active than the littoral zone near which OK-A is located. Located a significant distance to the west of the East Pass ebb shoal, OK-A would not interact with its littoral zone in the way the Walton Borrow Area interacts with its littoral zone. Walton Borrow Area Impact Analysis and Monitoring Taylor Engineering's borrow area impact analysis for the Walton Borrow Area was similar to the impact analysis for OK-A in that both consisted of "wave models and hydrodynamic models." Tr. 156. The Walton impact analysis showed "one potential impact area about 2,000 feet long [on the beach] just west of East Pass," id., an impact area also described as extending from approximately 3,000 to 5,000 feet west of the westernmost jetty at East Pass. It anticipated that impact would be caused by wave action due to the perturbation resulting from the presence of the dredged Walton Borrow Area. The potential impact was projected by the analysis to be a reduction in the sediment supply to the beaches west of East Pass by 11,000 cubic yards per year. Because of that reduction, DEP included a mitigation condition in the Walton Project permit: placement of 55,000 cubic yards on the impacted beach. As a condition of the Walton Project, Taylor Engineering conducted monitoring of the impacts to the beach from the project in general and in particular from the Walton Borrow Area. At the time of hearing, reports for 2007, 2008, and 2009 had been completed and the engineering firm was working on the 2010 report. Mr. Trudnak described the results from the monitoring through 2008 at hearing. From the period of pre-construction in 2006 through immediate post-construction, the monitoring revealed "a huge volume of erosion." Tr. 159. Subsequent analysis from 2007 to 2008 revealed "a huge amount of accretion that actually exceeded the amount of erosion from the previous year." Id. The volumes of erosion and accretion "seemed abnormal." Id. The bottom line, however, of the two years of data is that the early erosion was more than countered by the accretion that occurred into 2008. After describing the impacts in the first two years of monitoring, Mr. Trudnak stressed the importance of what was revealed by additional monitoring. "[M]ore important is the long term trend . . . ." Id. From 2006 through 2009, the monitoring area "as a whole, actually accreted, it gained sand." Tr. 160. Determining the impacts to the beach caused by the Walton Project is complicated because of impacts caused by behavior of the beach at the time of construction and earlier. Consistent with the Department's "critically eroded" designations, data from March of 1996 (not long after Hurricane Opal), data from June, 2004 (before Hurricane Ivan) and 2006 pre- construction data showed the shoreline adjacent to the Walton Project Area to have been receding landward at a rapid rate. This "background" erosion is due mainly to the effects of tropical storms. In the wake of the dredging of the Walton Borrow Area it was difficult for Taylor Engineering to determine what impacts were caused by "background" erosion due to tropical storms and what impacts were caused by the dredging of the Walton Borrow Area. In contrast, it is not difficult to determine from monitoring data in the three years after construction of the Walton Project, however, that the beach west of the borrow area has accreted and that this appears to be the long-term trend. Tr. 159. Contrary to conclusions Petitioners would have drawn from the evidence presented by their experts, the more comprehensive data indicates that the Walton Project (including its borrow area) is having a beneficial impact on the beaches to the west of the project and its borrow area. Dr. Young opined on behalf of Petitioners that the problem with the OK-A Borrow Area Impact Analysis is that it is based on modeling which is far inferior to "real world" data. His opinion that actual data is superior to data generated by modeling, no doubt, is sound. The only "real world" data that will prove any impacts for sure, whether adverse or beneficial, from a dredged OK-A, however, is after-the-fact monitoring data. Such data is usually obtained annually after the construction of a project or after major storm events. It consists of obtaining near-shore and offshore monitoring profiles and involves determining shoreline changes and volumetric beach changes.32/ In the absence of data from monitoring impacts of a dredged OK-A, Dr. Young opined that the data derived from monitoring the Walton Borrow Area which showed erosion early after completion of the Project is superior to the modeling data reviewed by Taylor Engineering in predicting impacts to Santa Rosa Island beaches. There are two problems, however, with Dr. Young's conclusion. First, beach impacts after the dredging of the Walton Borrow Area do not necessarily support similar impacts from a dredged OK-A because the two borrow areas are materially different. Second, the trend revealed by the more comprehensive data gathered in the wake of the dredging of the Walton Borrow Area is that the beach is receiving impacts which are beneficial. Reasonable persons might differ as to the outcome of reasonable assurances with regard to impacts based on the testimony of Mr. Trudnak and Drs. Dally and Young. The balance, however, swings clearly in favor of the applicant in consideration of the testimony of Ralph Clark. Mr. Clark and The Department's Review of Western Destin Project Borrow Site Impacts Ralph Clark is a Registered Professional Engineer in Florida. The recent recipient of the Stan Tate Award from the Florida Shore and Beach Preservation Association, a lifetime achievement award for work over the years in beach preservation, at the time of hearing, Mr. Clark had worked for 37 years for the State of Florida as a coastal engineer. During his long career, Mr. Clark has worked on the State's two separate regulatory programs in the arena of beach management: a "Wet Beach Program, which is working below Mean High Water and includes projects such as beach restoration" tr. 485, and "the more dry beach program which involves construction seaward of Coastal Construction Control Lines and activities landward of Mean High Water . . . ." Id. He has been involved with the Department's Beach Management Program, a grants program for cost-sharing with local governments to develop a long-term comprehensive management plan for the state to solve critical impact problems around Florida which may include erosion. He has conducted or prepared the Critically Eroded Beaches Report every year "going back to the late 1980's" id., and he has "conducted Beach Erosion Studies and Storm Damage Impact Investigations around the State for the past four decades." Tr. 486. Among his specific duties is the review of "scopes of work and project feasibility studies that are provided . . . by the [Department's] Beach Management Section." Id. In this capacity, Mr. Clark conducted the Department's engineering review of the Western Destin permit application and additional information related to the Project. After review, Mr. Clark reached the conclusion that the "Project is a well designed Beach Restoration Project that's critically needed . . . to restore the beaches of Western Destin to provide needed storm protection, recreational benefits and wildlife habitat." Tr. 488. With regard to his overall conclusion as to the Project's physical impacts, Mr. Clark testified: Id. In my opinion, the placement of 831,000 cubic yards of beach compatible sand fill along Western Destin will provide a positive, beneficial impact to the beach and dune system of Western Destin. The excavation of that material from the proposed borrow area [OK-A], along with the excavation of material for four other fill projects proposed for Santa Rosa Island, three of which have been approved, is not expected to have any adverse impact to the beaches of Santa Rosa Island. Mr. Clark's opinions that the Project would be beneficial to the beach and dune system and that the excavation of OK-A is not expected to have adverse impacts have a solid base. His opinions are founded on extensive experience with beach restoration projects over 37 years; extensive experience with coastal processes, coastal morphology, and coastal hydrodynamics; review of the application and supporting information; experience with the Project area and vicinity; extensive experience with coastal storm impacts and beach erosion; and review of roughly three dozen technical documents. Mr. Clark has reviewed 136 beach restoration projects. Of these, 111 were in Florida, six in other states and Puerto Rico, and 19 in countries on every continent in the world other than Asia. But coastal engineering experience in Asia is not missing from Mr. Clark's resume. He has conducted beach erosion control projects and coastal and shore protection projects (as distinguished from beach restoration projects) in that continent as well. Among the "countless number" tr. 490, of such projects he has reviewed are ones in the Netherlands, Denmark, Italy, Turkey, Egypt, China, and the Bahamas." Id. The reason his experience extended beyond the State of Florida to nations all over the world is because "the Florida Beach Preservation Program is internationally recognized." Id. The State has received many requests for technical assistance from various world governments. Mr. Clark has also in his time away from his employment with the state served as a consultant to the governments of Mexico, the Cayman Islands, and the Island Nation of St. Bartholomew and the French West Indies. Mr. Clark has investigated the impacts of 83 tropical storms in the Gulf of Mexico. Most investigations have been in Florida but some have been in other Gulf states and along the coast of the country of Mexico. During some of those investigations and while acting as a coastal engineer for the state, Mr. Clark visited the vicinity of Santa Rosa Island 176 times, excluding academic field trips. In his capacity as a state coastal engineer, Mr. Clark provided the Department with detailed damage assessments for each of the eight tropical storms noted in the Consolidated NOI for the Western Destin Project Over his 37 years, Mr. Clark served on numerous task forces, committees and technical advisory groups relating to erosion control and beach management efforts by states along the Gulf and Mexico. Mr. Clark's early reports were used in the development of the state's Strategic Beach Management Plan and he prepared the first "Critically Eroded Beaches in Florida document" tr. 494, now electronically available to the public on the Department's website. The report prepared by Mr. Clark which led to the designation of the Western Destin Project beach as critically eroded showed that the areas from R-17 to roughly R-20.3 and R- 23.2 to R-25.5 revealed erosion through deflation of the beach profile and recession of the shoreline to such an extent that upland development and infrastructure would be threatened. The report is based on evaluation and projection of the impact of a 25-year storm event. The same report did not conclude that a 25-year storm event would provide the same level of threat to the area between R-20.3 and R-23.2 (the shoreline along the MACLA Intervenors' Property and the Oceania Gap) although that stretch of the beach is "potentially threatened by a 50 to a 100-year storm event." Tr. 499. The "R-20.3 to R-23.2" segment was included in the critically eroded designation for design and integrity of the Project and continuity of management of the coastal system. The designation of the Project area as critically eroded was made in 2006 and was updated by the Department at the request of the County in 2008. The 2008 update indicated no need to change the designation. Although not as threatened as the rest of the shoreline in the Project, the shoreline along the Middle Segment, (including the MACLA Intervernors' Property and the Oceania Gap) is erosional. Data obtained as late as October 19, 2009, indicate that there had been more erosion since a Mean High Water Survey located the MHWL in 2008. The data does not show volumetric change, only that "there is a continued trend of erosion" of the shoreline in the Oceania Gap. Tr. 506. With the Oceania Gap eliminated from the Project, elimination of the rest of the property in the Project's Middle Segment (between R-20.3 and R-23.2) would make the remainder of the Project unstable. It would "isolate a 2,000-foot segment between R-23.2 and R-25.5 [the Eastern Segment] . . . and a 2,000-foot fill segment is not long enough to be a stable fill segment." Tr. 507. Although the elimination of all of the Middle Segment would not hurt "the very far west end" of the Project "very much," tr. 508, the elimination of the entire Middle Segment from the Project would also make the very east end of the Western Segment "relatively unstable." Tr. 508. The Middle Segment, therefore, while not critically eroded, would benefit from beach restoration. Restoration will provide protection from the erosion it is experiencing and from 50-year and 100-year storm events should they occur during the life of the restoration. Restoration will include dune work that will provide protection from storm surge and dissipate the wave energy seaward of any structures in the Middle Segment. Recent storm events have been 50-year and 100-year events. In the area of the Project, "Hurricane Opal was comparable to a 100-year storm event." Tr. 509. In Pensacola Beach, Ivan was a 200-year event. In the Destin area, Ivan "probably dropped to just below a 100-year storm event in terms of its magnitude. Hurricane Dennis was probably comparable to a 50-year storm event." Id. The best defense against 25-year, 50-year, and 100- year storm events is beach restoration. The OK-A Borrow Area is an offshore borrow area. Mr. Clark gave a few examples of other borrow areas that are offshore borrow areas and that are as large as OK-A. These were borrow areas used in the restoration of beaches in Panama City, Delray Beach, Canaveral Shoals, and Anna Maria Island. In addition to Taylor's Borrow Area Impact Analysis Report, Mr. Clark based his opinion on review of monitoring data for the many restoration projects with which he has been involved. Mr. Clark has reviewed borrow area impacts on beach restoration projects that have had adverse impacts. But these projects, typically, were "in inlet ebb tidal deltas of tidal inlets." Tr. 518. Located about three miles east of the ebb shoal of East Pass, OK-A is not an inlet-related borrow area. Of the 111 beach restoration projects that Mr. Clark reviewed, there was one that had an off-shore borrow area that adversely impacted the adjacent beach: the Anna Maria Island Project. The Anna Maria Island Borrow Area was located "roughly 1,000 feet off the [adjacent] beach . . . ." Tr. 519. In comparison, OK-A "is four to five times further offshore than the Anna Maria Island borrow area." Tr. 520. If instead of OK-A, the Project were to use a borrow area as close to the shore as the Anna Maria Island Borrow Area, its impacts to the shoreline would be both adverse and beneficial. The impact to adjacent beach would be erosion, but to the beach to the west of the borrow area the impact would be accretion. Mr. Clark's opinion of no impacts to the beach from dredging OK-A would be entirely different if OK-A had been located in the near-shore zone where "it's a whole different ball game." Tr. 532. The location of OK-A, between 4,000 and 5,000 feet offshore is in a zone that is "no problem," that is, it is not in the near-shore and far enough off shore that it will not cause impacts, adverse or beneficial, to the beaches and shores of Okaloosa County. For all his experience and coastal engineering prowess, Mr. Clark is not an expert in modeling. He relies on others within the Department to evaluate the sufficiency of a model or its methodologies. Mr. Clark did not ask anyone in the Department to evaluate the models used by Taylor Engineering. Dr. Young disagreed with the opinions of Mr. Trudnak and Mr. Clark that there would be no adverse impacts to the beach. He was sure that the dredging of OK-A would cause an adverse impact that would be either erosion or a decrease in the accretion that occurred in recent years along the beaches of Okaloosa Island. Dr. Young also cast doubt on Mr. Clark's experience as support for the opinion that dredging of OK-A would cause no adverse impacts. "Nobody believes there's ever been an adverse impact from a borrow area . . . ." Tr. 1206. Dr. Young used the "real world" experience with the Walton Borrow Area to back up that doubt. "[T]he problem is that we're not doing a good job of monitoring this project [the Walton Project] and the problem is convenient interpretation of the monitoring results." Id. Dr. Young's doubt about the value of Mr. Clark's experience was tempered by the reality of beach restoration in contrast to other types of projects whose failure was sudden, dramatic and easily discernible. Dr. Young: [W]hen a bridge collapses, civil engineers converge on that failed project and they learn more from that failure than they could ever learn from a bridge that lasted 30 years. And . . . one of the problems with coastal project design is that never happens. We never have a beach nourishment project that disappears in six months or a borrow area that causes erosion and coastal engineers converge from around the country and say, wow, here's a project that went wrong. And I think that is one of the hurdles that we need to cross in order to do a better job of project design. * * * We have no clear definition of what a failed project is. So, that way you can never have one that fails. And to me, a failed project is one that does not meet the promises made in the design of that project. And a failed project is also one where there are impacts that occur as a result of the project that are not adequately mitigated or anticipated. Tr. 1150-1. When asked the question of whether there is a definition of a failed beach restoration project in the literature or that is generally accepted by the coastal engineering community, see tr. 1152, Dr. Young testified, "I have not seen one." Tr. 1152. He added, " I would assume they might offer a similar definition [to mine], if the project doesn't work the way we said it would, then we would consider that a failure. But there is certainly not large scale discussion of projects that did not perform as designed." Tr. 1152-3. Dr. Young, like Dr. Dally, did not perform any analysis to quantify any degree of erosion or decreased accretion. Nor has he ever performed modeling to analyze borrow area impacts in keeping with his view of the inutility of modeling for accurate prediction of beach impacts. Variance The "Variance" referenced in the Consolidated NOI concerns two related variances: one from rule 62- 4.242(2)(a)2.b., and the other from rule 62-4.244(5)(c). The northern boundary of the proposed borrow area is within Outstanding Florida Waters ("OFW"). That location led the County to seek a variance from the limitation in rule 62- 4.242(2)(a)2.b. that turbidity can exceed background conditions in OFW during permitted construction activity for no more than 30 days. Section (2) of rule 62-4.242 sets "standards applying to Outstanding Florida Waters." Subsection (a)2.b of section (2) of the rule reads as follows: (a) no Department permit . . . shall be issued for any proposed activity . . . within an [OFW] or which degrades an [OFW], unless the applicant affirmatively demonstrates that: * * * 2. The proposed activity . . . is clearly in the public interest, and . . . * * * b. the existing ambient water quality within [the OFW] will not be lowered as a result of the proposed activity . . . , except on a temporary basis during construction for a period not to exceed thirty days . . . . The County also sought a variance from rule 62- 4.244(5)(c) which governs mixing zones in surface waters and reads: In no case shall the boundary of a dredge and fill mixing zone be more than . . . 150 meters in radius in . . . bodies of water [other than flowing streams], where these distances are measured from the cutterhead, return flow, discharge or other points of generation of turbidity or other pollutants. Section 120.54(2) authorizes an agency to grant a variance as follows: Variances . . . shall be granted when the person subject to the rule demonstrates that the purpose of the underlying statute will be or has been achieved by other means by the person and when application of a rule would create a substantial hardship or violate principles of fairness. Nephelometric turbidity units ("NTUs") in OFWs cannot exceed zero at the edge of the 150 meter radius referenced in rule 62-4.244(5)(c). To keep NTUs at zero outside the 150 meter radius, the County "would have had to almost continually be shutting down . . . .[its hopper] dredge," tr. 415, because the turbidity plume created by the hopper dredge's activity would have regularly extended beyond the 150 meter radius. Use of a different type of dredge (such as a cutterhead) would not alleviate the need for the variances for the construction of the Project. A cutterhead dredge is substantially more expensive with regard to both mobilization costs and actual dredging: $15-$20 per cubic yard versus $8 per cubic yard for a hopper dredge. Cutterhead dredges, moreover, do not operate in waves as effectively as hopper dredges. In rough water, "a cutterhead would see much more down time and conditions [could cause] a cutterhead . . . to stop dredging and go into safe harbor into East Pass." Tr. 173. The variance from rule 62-4.244(5)(c), therefore, was needed because the standard size mixing zone would have created a substantial hardship for the County. In addition to outlining the substantial hardship, the County provided two additional bases in its application to justify the variances: (a) no resources in the area, such as hard bottom or sea-grass beds, would be affected by a turbidity plume and an expanded mixing zone; and (b) citation to the Pensacola Naval Air Station ("NAS") project claimed to be similar in that it involved OFW and had received a variance. Upon receipt of the application for the variances, the Department requested additional information to establish whether OK-A, in fact, would be within OFW and more analysis of the comparability with the Pensacola NAS project. The Department's engineering section determined that the comparability of the Pensacola NAS project was not adequately demonstrated because of a lack of detail about the hydrodynamics and mixing zone sizes of the two sites. Nonetheless, the staff responsible for making the final decision on the variances (and ultimately the Department) determined the County's information justifying the variances to be sufficient. In granting the variances, the Department did not rely on the County's comparison of the Project to the Pensacola NAS project. As explained by Dr. Edwards at hearing, "[H]aving the data . . . from an actual project to back up and . . . calibrate a mixing zone is an added bonus, but we just didn't have it in this particular case." Tr. 420. The Department based its decision, in part, however, on background knowledge from permitting of borrow areas and beach projects "all over the Panhandle," tr. 421, and the data gathered from them including "data from side scan sonar from seismic information all along this area." Id. Included in this background is knowledge of a similar mixing zone of 1,500 meters established for one of the Eglin AFB beach restoration projects which excavated OK-A with a hopper dredge and in which the 1500- meter mixing zone was determined to be appropriate. Independent of the information provided by the County, the decision, therefore, was founded on the Department's own knowledge that no resources would be impacted by an expanded mixing zone and that there was a comparable project in the area (not the Pensacola NAS project) that had been allowed a 1500- meter mixing zone. In applying the standard from section 120.54(2) related to the underlying intent of the rules at issue and the statutes, the Department determined that "[t]he Project in the OFW was clearly in the public interests, according to [section] 373.414 and the minimum Water Quality Standards, even within the mixing zone[,] would still be met." Tr. 421-2. There were at least two other mitigating factors that the Department entertained as support for its decision. First, because of the difficulty in controlling turbidity in open waters in the Gulf, the 1,500-meter mixing zone established by the Consolidated NOI actually "is on the small side," tr. 422, of a mixing zone for the dredging of a borrow area to serve a beach restoration project. Second, 29 NTUs is the maximum turbidity allowed in waters that are not OFW. An extended mixing zone to allow the County to exceed 29 NTUs outside OFW was not granted as part of the variances under the Consolidated NOI. Petitioners presented no evidence to rebut the testimony elicited by the Department and the County that the purpose of the statute underlying the rules from which the variances are sought will be met by other means and that the application of the rules will create a substantial hardship. Changed Site Conditions 267. Rule 62B-49.005(16) provides: If site conditions change during the processing of an application to such an extent that the data already provided can no longer be used to determine consistency as provided in this chapter, then the application shall be denied unless the applicant agrees to waive the 9-day time requirements of Chapter 120.60, Florida Statutes, and provides the additional information required to reanalyze the application. After the filing of the County's application, malfunction of British Petroleum's Deepwater Horizon offshore oil rig in the Gulf of Mexico led to the Oil Spill, a discharge of a massive amount of oil and natural gas into the Gulf of Mexico. No evidence was presented that showed the Oil Spill had caused impacts to the OK-A Borrow Area. The permit was revised, nonetheless, to add language in the wake of the Oil Spill that requires the County to visually inspect the borrow area prior to construction activity and to analyze sand samples from the borrow area. The County, therefore, plans to send a diver to collect samples to be analyzed for contamination. See tr. 175. Western Destin Erosion Control Line The requirement for an Erosion Control Line is in section 161.161: Once a project is determined to be undertaken, a survey of all or part of the shoreline within the jurisdiction of the local government in which the beach is located shall be conducted in order to . . . locate an erosion control line. * * * In lieu of conducting a survey, the board of trustees may accept and approve a survey as initiated, conducted, and submitted by the appropriate local government if said survey is made in conformity with the appropriate principles set forth in ss. 161.141-161.211. § 161.161(3), Fla. Stat. The Draft JCP as originally issued did not require the establishment of an ECL. It required the establishment of a Pre- project Mean High Water Line instead. The Second Revised Draft JCP dispensed with the requirement of a Pre-project MHWL. It requires that an ECL be established for all properties within the 1.7 miles stretch of beach in the Project area subject to beach restoration.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is recommended that the Department of Environmental Protection enter a final order issuing the Joint Coastal Permit, Variance, and Sovereign Submerged Lands Authorization as revised during the course of these proceedings. DONE AND ENTERED this 29th day of June, 2011, in Tallahassee, Leon County, Florida. S DAVID M. MALONEY Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 29th day of June, 2011.
The Issue The issue before the Florida Land and Water Adjudicatory Commission (FLWAC) in this proceeding is whether to grant the Amended Petition to Establish the Palm Coast Park Community Development District (Amended Petition) dated October 13, 2004. The local public hearing was conducted for the purpose of gathering information in anticipation of rulemaking by FLWAC.
The Issue All Three Cases Whether the Petitioners have standing to bring their respective challenges pursuant to Section 120.56(4), Florida Statutes? Case No. 10-5348RU Whether either or both Original Specific Condition 1 and the Department ECL Position constitute a rule? Case Nos. 10-6205 and 10-8197 Whether Specific Condition 5 constitutes a rule? Attorney's Fees Whether an order should be entered against the Department for costs and attorney's fees under Section 120.595(4), Florida Statutes?
Findings Of Fact The Draft Permit The Draft Permit (and its revisions) authorizes the County "to construct the work outlined in the activity description and activity location of this permit and shown on the approved permit drawings, plans and other documents attached hereto." Joint Exhibit, Vol. III, Tab 9, page 3 of 26. The "activity description" and the "activity location" are detailed on the first page of the Draft Permit. See Joint Exhibit, Vol. III, Tab 9 (first page of 26). The drawings, plans and other documents attached to the Draft Permit are contained under Tab 10 of Volume III of the Joint Exhibit. The Parties Petitioner Guidry is co-trustee of the Guidry Living Trust (the "Guidry Living Trust"). He has independent authority to protect, conserve, sell, lease, encumber or otherwise dispose of trust assets. Those assets include a condominium unit in the Oceania Condominium. The condominium unit owned by the Guidry Living Trust includes an undivided interest held with all other unit owners in the common property at the Oceania Condominium. The common property includes real property that fronts the Gulf of Mexico located at 720 Gulf Shore Drive in the City of Destin, Florida. The real property has the MHWL of the Gulf of Mexico as its southern boundary. Petitioner Oceania is a condominium association established pursuant to Florida's Condominium Act, Chapter 718, Florida Statutes. It does not own any real property. Mr. Guidry testified that he is authorized in his capacity as president of the Association to initiate and pursue this administrative proceeding on its behalf. No documents were entered in evidence reflecting that Oceania's Board of Directors approved the filing of the petition. The owners of condominium units at the Oceania Condominium, including the Guidry Trust, comprise the membership of Oceania. The unit owners all own undivided shares in the Oceania Condominium common property including the real estate that extends at its southern boundary to the MHWL of the Gulf of Mexico. The owners did not vote on whether to file the petition in Case No. 10-05348RU. Petitioners David and Rebecca Sherry are leaseholders of real property where they reside. Located at 554 Coral Court, Number 511, Fort Walton Beach, Florida 32548, the property is in an area in Okaloosa County on Santa Rosa Island that is known as Okaloosa Island. The property leased by the Sherrys is not within the Western Destin Project. Petitioner John Donovan is a leaseholder of real property located at 909 Santa Rosa Boulevard, Numbers 131-132, El Matador Condominium, Fort Walton Beach, Florida 32548, in the same area as the Sherry's residence. Petitioner MACLA II, Ltd., is a Texas Limited Partnership. Louise Brooker is its president. It owns real property which fronts the Gulf of Mexico located at 620 Gulf Shore Drive, Destin, Florida. The southern boundary of the property is the MHWL of the Gulf of Mexico. The MACLA property is located adjacent to the shoreline that is the subject of the Western Destin Project. The Betty Price Hughes Qualified Vacation Residence Trust (the "Hughes Trust") owns real property at 612 Gulf Shore Drive. Its southern boundary is deeded the MHWL of the Gulf of Mexico. The property is located adjacent to the shoreline subject to the Western Destin Project. Petitioner H. Joseph Hughes is a trustee of the Hughes Trust. Petitioner Kershaw Manufacturing Company, Inc., an Alabama corporation, is the owner of real property located at 634 Gulf Shore Drive, Destin, Florida. Its southern boundary the property is the MHWL of the Gulf of Mexico. The property is located adjacent to the shoreline subject to the Western Destin Project. Royce Kershaw is the president of the Kershaw Manufacturing Company. He testified that as president of the company, he has the authority to act on behalf of the company and has the power to bind the corporate entity. The Department of Environmental Protection is responsible for the administration of Chapter 161, Florida Statutes, Parts I and II, the "Beach and Shore Preservation Act." § 161.011, Fla. Stat. The Board of Trustees of the Internal Improvement Fund is responsible for stewardship of its public trust properties under Chapter 253, Florida Statutes. Included among those properties is the sovereignty submerged lands along the coast of the Gulf of Mexico. The ECL and the MHWL In the context of the Beach and Shore Preservation Act, the MHWL and the ECL were discussed by the Florida Supreme Court in Walton County v. Stop the Beach Renourishment, Inc., 998 So. 2d 1102 (Fla. 2008) (the "Walton County Supreme Court Case"): Pursuant to section 161.141, when a local government applies for funding for beach restoration, a survey of the shoreline is conducted to determine the MHWL for the area. Once established, any additions to the upland property landward of the MHWL that result from the restoration project remain the property of the upland owner subject to all governmental regulations, including a public easement for traditional uses of the beach. § 161.141. After the MHWL is established, section 161.161(3) provides that the Board must determine the area to be protected by the project and locate an ECL. In locating the ECL, the Board "is guided by the existing line of mean high water, bearing in mind the requirements of proper engineering in the beach restoration project, the extent to which erosion or avulsion has occurred, and the need to protect existing ownership of as much upland as is reasonably possible." § 161.161(5). Pursuant to section 161.191(1), this ECL becomes the new fixed property boundary between public lands and upland property after the ECL is recorded. And, under section 161.191(2), once the ECL has been established, the common law no longer operates "to increase or decrease the proportions of any upland property lying landward of such line, either by accretion or erosion or by any other natural or artificial process." Walton County, at 1108. The Pre-project MHWL in This Case and the ECL The Pre-project MHWL called for by Original Specific Condition 1 was never established. No evidence was introduced as to where the Pre-project MHWL would have been located had it been set and in particular, where it would have been located in relation to an ECL. Rod Maddox is a long-time surveyor with the Department's Division of State Land in the Bureau of Survey & Mapping. See P-244. Mr. Maddox testified about his experience with pre-project MHWLs and where they are located in relation to ECLs. Familiar with the term "pre-project mean high water line," Mr. Maddox defined it as the mean high water line prior to the placement of fill used in a beach restoration project. See id. at 29. He testified that pre-project MHWLs have been required in the many beach restoration cases with which he is familiar. He testified further that when it comes to location, there is no difference between a pre-project MHWL and an ECL. The denominations may be different but Mr. Maddox testified "as to how . . . established, I see them as one and the same." Id. at 30. Original Special Condition 1: the Pre-project MHWL On December 31, 2009, the Department issued the NOI. Attached to it was the Draft Permit. The Draft Permit contained the following paragraph as Special Condition 1: Prior to construction of the beach restoration project, the Permittee must record in the official records of Okaloosa County a Certificate, approved by the Department, which describes all upland properties (including their owners of record) along the entire shoreline of the permitted project, with an attached completed survey of the pre-project Mean High Water Line ("Mean High Water Line Survey") conducted along the entire permitted project shoreline length. The Mean High Water Line Survey must have been completed in a manner complying with Chapter 177, Florida Statutes, as determined by the Department. No construction work pursuant to this joint coastal permit shall commence until the Certificate and attached Mean High Water Line Survey have been approved and archived by the Department's Bureau of Survey and Mapping, and the Department has received proof of recording of such documents (see Specific Condition No. 4.c.). The approved Certificate and attached Mean High Water Line survey shall be attached to, and kept as part of this joint coastal permit and authorization to use sovereign submerged lands. If in the future the Permittee seeks reimbursement from the State for costs expended to undertake (construct) the permitted project, then, prior to, and as a condition of receipt of any authorized and approved reimbursement, the Board of Trustees will establish an ECL consistent with the provisions of Chapter 161, Florida Statutes. The Permittee shall be required to record such a line in the Okaloosa County official records. Joint Exhibit, Vol. III, No. 9. The Oceania Petitioners, as landowners within the Project area, challenged the issuance of the Draft Permit on January 14, 2010. See Case No. 10-0516. Among the bases for the challenge was that the Department lacked authority to implement Original Special Condition 1 and, in particular, its requirement that the County record a completed survey of the pre-project MHWL in lieu of the establishment of an ECL. On July 26, 2010, the Department revised the Draft Permit to eliminate from the Project the common property owned by the unit owners of the Oceania Condominium. The change was supported by a letter from Michael Trudnak, P.E., of Taylor Engineering, Inc., on behalf of the County which stated: "On behalf of Okaloosa County, Taylor Engineering submits this request to modify the project area and Draft Joint Coastal Permit for the Western Destin Beach Restoration Project [file nos. excluded]. The applicant has decided to remove the Oceania Condominium property from the beach fill placement area." Joint Exhibit, Vol. III, Tab 15, Exhibit A. The revised project, as described in permit drawings enclosed with Mr. Trudnak's letter includes two reaches: Reach 1 extends from the east jetty of East Pass to approximately 600 ft east of FDEP reference monument R-22 (R22.6) and Reach 2 extends from approximately 200 ft east of R-23 (R-23.2) to R-25.5. The Oceania Condominium property is in the gap between the two beaches. Additionally, the letter requested that the Department modify Specific Condition 1 of the Draft Permit to reflect the modified project area so that the MHWL Survey requirement of Specific Condition 1 would exclude the Oceania Condominium property. In accord with the request, Special Condition 1 was amended to add the following language: "With respect to the shoreline seaward of the Oceania Owner's [sic] Association, Inc., members' common elements property, neither a pre-project Mean High Water Line survey, nor a Certificate with a description of the pre-project Mean High Water Line shall be recorded in conjunction with this coastal permit." Joint Exhibit, Vol. III, Tab 15, the First Revised Draft Permit, Page 5 of 26. On August 4, 2010, as the Department neared the end of its case in the third day of the hearing, it announced that the Revised Draft Permit would "be revised [again, this time] to require the establishment of an ECL under the applicable statute." Tr. 621. The draft permit, accordingly, was revised for a second time (the "Second Revised Draft Permit"). The Department carried out the second revision in a notice filed at the Division of Administrative Hearings on August 18, 2010 (the August 18, 2010, Notice). The August 18, 2010, Notice contains two changes to the First Revised Draft Joint Permit. The first change deletes the existing language in Original Specific Condition 1 (the language challenged in Case No. 10-5348RU) in its entirety. It substitutes the following language: Prior to construction of the beach restoration project, the Board of Trustees will establish an Erosion Control Line along the shoreline of the beach restoration project. The Erosion Control Line shall be established consistent with the provisions of ss. 161.141-161.211, Florida Statutes. An Erosion Control Line shall not be established in conjunction with this joint coastal permit with respect to the shoreline seaward of the Oceania Owner's [sic] Association, Inc. members' common elements property. In lieu of conducting a survey, the Board of Trustees may accept and approve a survey as initiated, conducted, and submitted by Okaloosa County if said survey is made in conformity with the appropriate principles set forth in ss. 161.141-161.211. Department of Environmental Protection's and Board of Trustees of the Internal Improvement Fund's Notice of Revisions to the Proposed Joint Coastal Construction Permit, page 3 of 4. The second change is made with respect to Specific Condition No. 4(c) of the First Revised Draft Permit, one of a list of items to be submitted to the Department for approval prior to the commencement of construction and the issuance of a Notice to Proceed by the Department. The existing language is deleted in its entirety and the following language is substituted: Written documentation that the Erosion Control Line required by Special Condition Number 1 has been filed in the public records of Okaloosa County. Id. The Department ECL Position Chapter 161: Beach and Shore Preservation Chapter 161, Florida Statutes, governs "Beach and Shore Preservation." "Parts I and II of this chapter may be known and cited as the 'Beach and Shore Preservation Act.'" § 161.011, Fla. Stat. Part I governs "Regulation of Construction, Reconstruction, and Other Physical Activity." Sections 161.011 through 161.241 comprise Part I. The Department developed its position on ECLs claimed by Petitioners to be an Unadopted Rule by considering Part I, in particular Sections 161.088 (which declares the public policy to properly manage and protect Florida's beaches) through 161.211. At some point in 2009, the Department saw a distinction related to ECLs in Sections 161.088-161.211 between beach restoration projects where state funding was used for construction and projects where no state funds were used. The former seemed to require ECLs, the latter not. Several statutory provisions were viewed as particularly relevant. For example, Section 161.141, Florida Statutes, declares that it is the public policy of the state "to cause to be fixed and determined, pursuant to beach restoration . . . projects, the boundary line between sovereignty lands . . . and the upland properties adjacent thereto " The section that mainly governs ECLs is Section 161.161. It provides the procedure for approval of projects for the restoration and maintenance of critically eroded beaches, subject to a beach management plan which is funded, in part, by the state. With regard to ECLs, the statute provides: Once a project [for the restoration and maintenance of a critically eroded beach] is determined to be undertaken, a survey of all or part of the shoreline within the jurisdiction of the local government in which the beach is located shall be conducted in order to establish the area of beach to be protected by the project and locate an erosion control line. * * * Upon completion of the survey depicting the area of the beach erosion control project and the proposed location of the erosion control line, the board of trustees shall give notice of the survey and the date on which the board of trustees will hold a public hearing for purpose of receiving evidence on the merits of the proposed erosion control line and, if approval is granted, of locating and establishing such requested erosion control line in order that any persons who have an interest in the location of such requested erosion control line can be present at such hearing to submit their views concerning the precise location of the proposed erosion control line. * * * The board of trustees shall approve or disapprove the erosion control line for a beach restoration project. In locating said line, the board of trustees shall be guided by the existing line of mean high water, bearing in mind the requirements of proper engineering in the beach restoration project, the extent to which the erosion or avulsion has occurred, and the need to protect existing ownership of as much upland as is reasonably possible. § 161.161, Fla. Stat. Development of the Department's Position on ECLs Prior to 2009, the Department's established ECLs for beach restoration projects whether the project's construction was supported by state funding or not. There was an exception: when the property landward of the MHWL was owned by the state. In such a case, the Department saw no need to set an ECL since both the sovereignty lands and the adjacent uplands property are owned by the state. This position held at least through January 15, 2009, when the Department held a workshop and hearing pursuant to Section 161.161, Florida Statutes, in Okaloosa County to establish an ECL for the Western Destin Project. The hearing officer who conducted the ECL hearing was West Gregory, Department Assistant General Counsel. While consideration of where the ECL should be established for the Western Destin Project was underway, there were ongoing discussions by e-mail and in briefings of whether the statute required an ECL. The discussion was prompted when Mr. Gregory, as Department Assistant General Counsel, drafted a memorandum (the "Draft Memorandum") to Michael Barnett, Chief of the Bureau of Beaches and Coastal Systems (the Bureau) to be sent through Paden Woodruff, an Environmental Administrator. The memorandum related to another beach restoration project in Okaloosa County: a project involving Eglin Air Force Base. The Draft Memorandum shows a date of January "XX", 2009, and is stamped "DRAFT." P-119. It presents the question "Should . . . [the Department] require the United States Air Force (USAF) to establish an erosion control line (ECL) for the beach restoration project located on Eglin AFB?" Id. The Draft Memorandum provides a brief answer: "No, . . . because the beach . . . is not critically eroded." Id. The memorandum recognizes the public policy of the state to fix the boundary between public and private lands for beach restoration projects in Section 161.141, Florida Statutes, and a requirement that the Board of Trustees "must establish the line of mean high water prior to the commencement of a beach restoration project," id., leading to the suggestion that each and every beach restoration project must establish an ECL. The Draft Memorandum, however, construes Section 161.141, Florida Statutes, with Section 161.161, Florida Statutes, and draws support from an Attorney General Opinion and the Walton County Florida Supreme Court case to conclude that it is only when a project is undertaken with state funding that an ECL must be established. In the case of the Eglin AFB beach restoration projects, the Draft Memorandum concludes: Id. This determination not to establish an ECL on the Eglin AFB beach restoration project would not preclude the USAF from obtaining a JCP permit. Rather, it precludes the USAF from receiving state funding assistance. The Draft Memorandum was not sent to the intended recipients. It was submitted to two other lawyers in the Department. Mr. Gregory did not receive comments from them. Although no comments were made to Mr. Gregory after the draft of the memorandum was sent to other members of the legal staff, the subject remained under discussion in the Department in early 2009. Sometime in early 2009, based on a legal analysis of Department attorneys, the Department took the position that an ECL is required to be set when state funds are used for the construction of a project. The converse of this position, that an ECL is not required to be set when no state funds are involved, is the statement alleged to be an unadopted rule. Two permits were issued that did not require an ECL: one for the Eglin AFB beach restoration project in March of 2009, and another that was an emergency permit for Holiday Isle. As with Specific Condition 1 in the Western Destin Project, the determination to not require an ECL was because of the lack of state funding. As Mr. Barnett testified about the two permits, there "is no State cost share for construction . . . [and] that's the reason [the Department] didn't require establishment of an ECL." Tr. 1279. Mr. Gregory's Draft Memorandum was never finalized. The Department issued three permits or draft permits (including for the Western Destin Project) with specific conditions that required pre-project MHWLs and that did not require ECLs. Otherwise, the Department has not committed the Department ECL Position to writing. Nonetheless, the Department ECL Position was stated in a deposition taken in this case on July 26, 2010. On July 26, 2010, the deposition of Janet Llewellyn, the Director of Water Resources Management was taken by Petitioners. Director Llewellyn is "responsible ultimately for all the projects that are processed and actions taken out of [the] division." P-223 at 10. These include permits issued by the Bureau and in particular, the Draft Permit, First Revised Draft Permit and the Second Draft Permit for the Project. When asked about the Department's statement that an ECL is not required when there is not state funding, Ms. Llewellyn preferred to rephrase the Department position as to when an ECL is required rather than when it is not required. She then testified that an ECL is required when there is "state funding involved through [the Department's] funding program." Id. at 13. Ms. Llewellyn was unable to pinpoint the moment the Department reached such a position other than: [t]he question came up sometime in the last year or two -- I couldn't tell you when -- about what the statute actually required in terms of when it was proper to set an erosion control line or required. And our attorneys did a legal analysis, again, of the statute, and that was their legal opinion of what the statute required. Tr. 14. Whatever the date that such a position was precisely firmed up, Ms. Llewellyn was able to testify on July 26, 2010, "that if state funding is going to a project, than an ECL needs to be set. That's what the statute requires." Id. This statement was based on the opinions of Department attorneys prior to their use in connection with the issuance of beach restoration permits in Okaloosa County. The Department has not initiated rule-making with respect to its ECL Position. Whether rule-making would be initiated was not known by the Bureau Chief on August 24, 2010, during his testimony in the final hearing. Change of Position The Department modified its position on ECLs that it appeared to have at the time of Ms. Llewellyn's deposition on August 4, 2010. As detailed above, it announced that an ECL would be required for the Western Destin Project, after all. The modification was formalized with the filing of the Second Revised Draft Permit on August 18, 2010. Specific Condition 5 Before the challenged language in Specific Condition 5 was added by the First Revised Draft Permit, the Department had relied on General Condition 6 to give notice to permittees that the permit did not allow trespass: This permit does not convey to the Permittee or create in the Permittee any property right, or any interest in real property, nor does it authorize any entrance upon or activities on property which is not owned or controlled by the Permittee. The issuance of the permit does not convey any vested rights or any exclusive privileges. Joint Ex. 9. Based on the petitions in the Permit Challenge Cases, the Department proposed in the First Revised Draft Permit to add to Specific Condition 5 the language that is underscored in the following: The Permittee is advised that no work shall be performed on private upland property until and unless the required authorizations are obtained. Sufficient authorizations shall included: (1) written evidence of ownership of any property which will be used in carrying out the project; (2) authorization for such use from the property owner which upland of mean high-water; (3) construction and management easements from upland property owners; or (4) a judgment from a court of competent jurisdiction which reflects that such authorization, in whole or in part, is not required. The Permittee is also advised to schedule the pre-construction conference at least a week prior to the intended commencement date. At least seven (7) days in advance of a pre-construction conference, the Permittee shall provide the written authorizations for the portion of the project for which construction is about to commence, as required above, written notification, advising the participants (listed above) of the agreed-upon date, time and location of the meeting, and also provide a meeting agenda and a teleconference number. Joint Exhibit, Volume III, Tab 15, the First Revised Draft Permit, Page 7 of 26. There was no evidence that the language added to Specific Condition 5 by the First Revised Draft Permit had been in any other permits or that the Department intended to use the language in any other beach restoration permits. Other than whatever might be gleaned from the Draft Permit, itself (and its revisions), there was no evidence offered that the property of any of the petitioners, in fact, would be used in the Western Destin Beach Project.
Findings Of Fact In May 1979, Respondent issued invitation for bids for office space in West Palm Beach, Florida, for the purpose of establishing a combined claims, tax, and appeals unemployment compensation office in the West Palm Beach area. The lease on the present office in West Palm Beach expires in December, 1979. Two prior invitations for bids on the required office space had failed to result in the receipt of any bids. The invitation for bids provided that Respondent reserved the right to reject any and all bids and to make the award deemed to be in the best interests of the State of Florida. (Testimony of Bradner, Exhibit 15) On May 30, 1979, Petitioner Richard S. Weinstein submitted the sole bid in response to the May 1979 invitation. He proposed to lease his building located at 1814 North Dixie Highway, West Palm Beach, and to meet all bid specifications and requirements. At the time of bid submission, Petitioner was leasing the building in question to a tenant who operated a used furniture store on the premises. In order to meet the specifications of the bid, the property required considerable renovation and improvement which Petitioner agreed to accomplish. (Testimony of Petitioner, Exhibit 2) A bid selection committee composed of four departmental employees in Respondent's Tallahassee headquarters was appointed to consider Petitioner's bid and arrive at appropriate recommendations. On June 7, 1979, one of the committee members, accompanied by several officials of the West Palm Beach Office, inspected Petitioner's building and the surrounding area to determine its suitability for the proposed unemployment compensation office. Based upon statements made by those officials and the building's tenant that the area was unsafe and subject to frequent vandalism and theft, the committee member thereafter recommended to the selection committee that the bid be rejected and that the Department should readvertise for new bids. The committee unanimously accepted the recommendation and, on June 13, 1979, Petitioner was advised in a letter from the Respondent's support services director that his bid had been rejected based on the "inability of the building to meet our programmatic needs." Petition thereafter protested the decision and, as a result, the Secretary of the Department, Wallace E. Orr, directed the entire committee to make an on-site evaluation of the property and surrounding area. Thereafter, on July 18, 1979, the committee visited the site. At this time, each committee member, together with one of the officials of the local office, inquired of various businessmen in the surrounding area as to local criminal activity and solicited their opinion as to safety and security problems. One of the committee members also telephoned a city police desk sergeant concerning crime statistics in the area. (Testimony of Petitioner, Lowhorn, Orr, Bradner, Exhibits 3-4, 12) Petitioner gave the committee members a petition from a number of local businessmen supporting his bid, and a letter from the nearby Good Samaritan Hospital advising that it may construct a medical office building adjacent to the hospital in the future. Letters were also sent to the Department by the manager of an apartment building adjacent to Petitioner's premises stating that the area was safe and that there had been no break-ins in more than four years, and from the Mayor of West Palm Beach to the Secretary of the Department describing the area and asserting that it was making a resurgence in character as a result of city improvements and that it was no more unsafe than most of the areas of the city. Another letter, dated July 20, 1979, was sent to the Department from the West Palm Beach Downtown Development Authority Executive Director stating that the area was growing, new buildings were being developed, and that the downtown area generally was becoming a "hub" for governmental facilities. Upon return to Tallahassee, each member of the bid committee rendered a report and recommendations concerning Petitioner's bid. They applied weighted criteria in its consideration, and concluded that the bid was unacceptable because it failed to meet the two criteria of "condition of immediate vicinity of location" and "security of the facility." In these respects, they basically found that (a) the various businesses in the area were essentially "fortified" against burglary and vandalism, (b) the proposed office would be subjected to break-ins and possible loss of valuable office equipment and unemployment compensation checks, (c) the local departmental employees would be fearful of working in an unsafe area and (d) an office located at Petitioner's premises would be "depressing" to members of the public who utilized the departmental services. No mention was made in the various reports of the petition or letters sent to the Department by civic officials. The committee again recommended rejection of the bid and, by letter of August 1, 1979, Petitioner was advised of this fact and that new calls for bids would be made in the near future. Secretary Orr had viewed the premises himself and agreed with the committee recommendations that the site was unsuitable for the establishment of a local office. He felt that placement of the office in the area where Petitioner's building was located would be inconsistent with departmental goals to upgrade their state offices and improve their "image." He had not been made aware of most of the various letters and the petition provided to the committee, but had considered the letter of the West Palm Beach Mayor prior to arriving at his decision. (Testimony of Butler, Frisch, Radner, Baker, Orr, Lowhorn, Renfroe, Quigg, Petitioner, Exhibits 6-10, 11-12, 16) The street on which Petitioner's building is located is commercial in nature, although it is on the fringe of a residential community. It is an older part of the city and, until about five years ago, was in a rundown and depressed condition. In recent years, however, there has been an upgrading of the character of the downtown area of West Palm Beach which extends northerly to encompass the businesses in Petitioner's vicinity. The establishment of governmental facilities in the downtown and adjacent areas have been encouraged and a state office building is located in the area. A Department of Health and Rehabilitative Services "halfway house" has been erected approximately two blocks from Petitioner's building. Additionally, a branch banking facility, professional offices, several quality restaurants, and other modern business establishments are in the near vicinity. A laundry plant is across the street from Petitioner's building and at the present time presents an unsatisfactory appearance. It is intended, however, by the owners to expand and remodel the building in the near future. The City of West Palm Beach has the second highest crime incident rate in the state based on population. The city is divided into ten zones for police purposes, and during 1978, the zone in which Petitioner's building is located was average from the standpoint of crime statistics. In the opinion of the City Chief Police Inspector, it is typical of the various commercial areas located along U.S. Federal Highway No. 1, and as safe an area in the daytime as any in the city. He is of the further opinion that a burglar alarm would be a sufficient security precaution for nighttime safety, and that with such protection, a building would have adequate security. The highest crime rate in the city is located in the zone where the city hall, police station and other governmental buildings are located. Although business and professional individuals in the area near Petitioner's building have experienced minor vandalism and occasional illegal entries in the past, they uniformly are of the opinion that the area is safe with normal security precautions, such as a burglar alarm. A local boat sales establishment has a fence around the premises and a watch dog, but no burglar alarm. These precautions are designed to protect the expensive boats which are located out- side the building. The apartment building next to Petitioner's premises has not experienced break-ins in recent years although some of its elderly patrons have been exposed to occasional purse snatching on the street. The laundry plant across the street from Petitioner's building experiences various window breakage by youths on the weekends, and had a break-in recently in the nighttime through a poorly secured door in the rear of the premises. (Testimony of Lowhorn, Stackhouse, Hauser, Hodges, Lee, Lunney, Eddy, Ring, Eaton, DeSanti, Witt (Deposition - Exhibit 1), Exhibits 12-14).
Recommendation That Petitioner's bid be accepted by Respondent and recommended for approval to the Department of General Services. DONE and ENTERED this 17th day of December, 1979, in Tallahassee, Florida. THOMAS C. OLDHAM Hearing Officer Division of Administrative Hearings 101 Collins Building Tallahassee, Florida 32301 (904) 488-9675 COPIES FURNISHED: John C. Moyle, Esquire 707 North Flagler Drive Post Office Box 3888 West Palm Beach, Florida 33402 Kenneth H. Hart, Jr. and Chad J. Motes, Esquires Department of Labor and Employment Security 2561 Executive Center Circle E. Suite 131 Tallahassee, Florida 32301
Conclusions An Administrative Law Judge of the Division of Administrative Hearings has entered an Order Closing File in this proceeding. A copy of the Order is attached to this Final Order as Exhibit A. Filed January 21, 2011 10:24 AM Division of Administrative Hearings DCA Order No. DCA11-GM-007
Other Judicial Opinions OF THIS FINAL ORDER PURSUANT TO SECTION 120.68, FLORIDA STATUTES, AND FLORIDA RULES OF APPELLATE PROCEDURE 9.030(b)(1)(C) AND 9.110. TO INITIATE AN APPEAL OF THIS ORDER, A NOTICE OF APPEAL MUST BE FILED WITH THE DEPARTMENT'S AGENCY CLERK, 2555 SHUMARD OAK BOULEVARD, TALLAHASSEE, FLORIDA 32399-2100, WITHIN 30 DAYS OF THE DAY THIS ORDER IS FILED WITH THE AGENCY CLERK. THE NOTICE OF APPEAL MUST BE SUBSTANTIALLY IN THE FORM PRESCRIBED BY FLORIDA RULE OF APPELLATE PROCEDURE 9.900(a). A COPY OF THE NOTICE OF APPEAL MUST BE FILED WITH THE APPROPRIATE DISTRICT COURT OF APPEAL AND MUST BE ACCOMPANIED BY THE FILING FEE SPECIFIED IN SECTION 35.22(3), FLORIDA STATUTES. YOU WAIVE YOUR RIGHT TO JUDICIAL REVIEW IF THE NOTICE OF APPEAL IS NOT TIMELY FILED WITH THE AGENCY CLERK AND THE APPROPRIATE DISTRICT COURT OF APPEAL. MEDIATION UNDER SECTION 120.573, FLA. STAT., IS NOT AVAILABLE WITH RESPECT TO THE ISSUES RESOLVED BY THIS ORDER. CERTIFICATE OF FILING AND SERVICE I HEREBY CERTIFY that the original of the foregoing has been filed with the undersigned Agency Clerk of the Department of Community Affairs, and that true and correct copies haye been furnished by U.S. Mail or Electronic May to each of the persons listed below on this day of January, 2011. / a Paula Ford Agency Clerk By U.S. Mail The Honorable Bram D. E. Canter Administrative Law Judge Division of Administrative Hearings The Desoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 By Electronic Mail Amy Taylor Petrick, Esquire Assistant County Attorney Palm Beach County 300 North Dixie Highway, Suite 359 West Palm Beach, Florida 33401 Gary K. Hunter, Esquire Vinette D. Godelia, Esquire Hopping Green & Sams 123 South Calhoun Street Post Office Box 6526 Tallahassee, Florida 33301 Richard Grosso, Esquire Robert N. Hartsell, Esquire Everglades Law Center, Inc. Shepard Broad Law Center 3305 College Avenue Fort Lauderdale, Florida 33314 DCA Order No. DCA11-GM-007