Findings Of Fact In July 1988, the Department of Health and Rehabilitative Services issued an Invitation to Bid (ITB) seeking proposals to lease approximately 26,000 square feet of space for offices and client services in Ft. Walton Beach, Florida. The ITB was the second issued, following the Department's determination that the first ITB did not result in an acceptable bid. Page 15 of the 16 page bid submittal form is entitled "Evaluation Criteria" and contains a list of weighted factors which are to be used in the evaluation of bids. In the second ITB, paragraph 3(b) of the criteria stated, "[P]rovisions of the aggregate square footage in a single building. Proposals will be considered, but fewer points given, which offer the aggregate square footage in not more than two locations provided the facilities are immediately adjacent to or within 100 yards of each other." (emphasis supplied) At approximately the same time as the Department's issuance of the second ITB, several meetings occurred related to concerns generated by the response to the first ITB. One meeting took place between Nelson P. Davis (the unsuccessful bidder in ITB #1) and Department representatives, including James Peters, HRS's District One Manager for Administrative Services. Davis currently leases to the Department, two adjacent buildings sited at 417 Racetrack Road, Ft. Walton Beach which comprise approximately 4,000 square feet less than the Department is now seeking. Davis' bid in response to the first ITB included utilization of a third building to meet the Department's space needs. 1/ During the meeting which included Peters, Davis, and others, it became apparent that there was confusion over the meaning of the word "location" in paragraph 3(b) of the evaluation criteria. Peters understood the word to mean "building" while Davis understood the word to mean an area which could be the site of more than one building. Following the Davis-Peters meeting, other meetings occurred at which Department officials considered the issue. While some representatives of the Department believed that the word "location" was synonymous with "building," others believed the use of "location" to be ambiguous. To clarify the Department's preference related to number of buildings, an amended page 15 of the bid submittal form was issued on July 2, 1988. The amended form, entitled "Evaluation Criteria" states in paragraph 3(b), "[P]rovisions of the aggregate square footage in a single building... Proposals will be considered, but fewer points given, which offer the aggregate square footage in not more than two buildings provided the facilities are immediately adjacent to or within 100 yards of each other." (emphasis supplied.) The amendment was issued at the direction of James Peters and was approved by Charlene Schembera, the District I Administrator. The amendment to page 15, paragraph 3(b), is a reasonable effort by the Department to clarify their intent in previous use of the word "location." The assertion by Davis that the change was made at the instigation of James Peters in order to prohibit Davis from successfully submitting a responsive bid of three buildings is not supported by the evidence. While James Peters has expressed on at least one occasion a desire to avoid entering into further business arrangements with Davis, he has stated that his personal opinion would not influence his participation in the bid solicitation process. The evidence did not indicate that his participation in the decision to issue an amended paragraph 3(b) of the evaluation criteria was based on his negative personal opinion regarding Davis, nor did the evidence indicate that any other person involved in the process had negative opinions about Davis. Further, although some Department officials testified that a bid which contained more than two buildings would be deemed non-responsive and disqualified from consideration by operation of the amended paragraph 3(b), such a position probably is not tenable, but is not at issue in this proceeding in that the Department has not yet acted on bids submitted in response to the second ITB. The Department has valid reasons for attempting to concentrate its personnel and client services in a single building, or in as few buildings as is possible, 2/ however the Invitation to Bid does not restrict bidders in such a manner. The sole expression of the preference for a single building, or for not more than two buildings, is expressed in paragraph 3(b) of the evaluation criteria on page 15. The amendment to page 15 of the bid submittal form does not appear to bar the submission by Davis or by any other bidder of a responsive proposal containing more than two buildings. Page 15 is clearly entitled "Evaluation Criteria." The criteria are nine weighted "award factors" upon which "all bids will be evaluated." Paragraph 3(b), as one factor for consideration in the evaluation process, expresses a preference for a single building containing the required aggregate square footage. The paragraph further advises that proposals will be considered but fewer points awarded for proposals containing not more than two buildings closely located. The weighting factor for paragraph 3(b) of the evaluation criteria is five percent of total possible points. The clear indication of the amended paragraph is that proposals which contain more than two buildings will receive no points under 3(b). The Department's position would disqualify as non-responsive a bid of three buildings based solely on an evaluation factor worth five percent of the total available points. On the other hand, a bid containing two buildings, separated by not more than 100 yards, would apparently be responsive and would be evaluated, even if the two buildings were divided by a major highway or other substantial obstacle. The Department's proposed position is not logical, but is not raised herein since it has not yet been applied in this case.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is hereby RECOMMENDED: That the Department of Health and Rehabilitative Services enter a Final Order dismissing Case No. 88-4392BID. DONE and ENTERED this 12th day of October, 1988, in Tallahassee, Florida. WILLIAM F. QUATTLEBAUM Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 12th day of October, 1988.
The Issue Whether the bid submitted by VSM of Florida, Inc., under cover of the bid blank issued to VSM, Inc. for the construction on State Project 16070-3511 (the Project), with the Florida Department of Transportation (Department), was the lowest responsive bid. Whether the Department acted arbitrarily, illegally, dishonestly or fraudulently in rejecting the bid submitted by VSM of Florida, Inc. under cover of the bid blank issued to VSM, Inc. for the construction of the Project based on the Department's determination that VSM of Florida, Inc. was not a prequalified contractor. Whether VSM, Inc., has standing to bring this bid protest by and on behalf of its operating subsidiary, VSM of Florida, Inc.
Findings Of Fact Upon consideration of all of the evidence, the following relevant findings of fact are made: Bids submitted on the Project were opened on May 27, 1992 and posted on June 18, 1992. The bid submitted by VSM of Florida, Inc. under cover of the bid blank issued by the Department to VSM, Inc., a prequalified contractor, was the apparent low bid on the Project in the amount of $1,565,565.00. The bid submitted by Leware under cover of the bid blank issued by the Department to Leware, a prequalified contractor, was the apparent second low bid on the Project in the amount of $1,600,000.00. All contractors who seek to bid on Department projects in excess of $250,000.00 must be prequalified by the Department in order to bid on such projects. The Project was in excess of $250,000.00 thereby requiring all bidders to be prequalified contractors. The Department's Contract Administration Office (CAO) is responsible for prequalifying contractors to bid on Department projects in excess of $250,000.00, for issuing bid packages for such projects, and for processing bids for award of a contract. The Department will not issue a bid blank for a project in excess of $250,000.00 unless a request for a bid blank is received from a prequalified contractor. Upon a request being made, the Department first determines that the contractor making the request is prequalified and has the capacity to bid on the project, then the Department prints or stamps the name of the prequalified contractor on the front page (cover sheet) of the bid blank and mails the bid package to the prequalified contractor. Contractors do not have to be prequalified to bid on projects of less than $250,000.00 but the Department's Equal Employment Opportunity (EEO) requirements would be applicable to projects of less than $250,000.00 as well as those in excess of $250,000.00. Contractors do not have to be prequalified to work as subcontractors on a Department project. The Department does not approve subcontractors on Department projects but does review and approve the use of subcontractors on Department projects to ensure that subcontractors do not perform in excess of 49% of the work on the project in violation of Standard Specification No. 8 in the Department's contract. Review of the subcontractors being used on a project is conducted by the Department's District offices and the CAO is not made aware of which contractors are being used as subcontractors an a project. There is no specific language in the application for prequalification that requires a separate application be submitted for each contracting firm seeking prequalification. However, a copy of the Department's rule included in the application package does require that a separate application must be submitted for each contracting firm seeking prequalification. The purpose of the information sought in Question 8 (Question 6 in 1989) of the application concerning the affiliates of the parent company is to: (a) determine if any of the affiliates have been disbarred by other agencies or convicted of contract crimes which would disqualify them or; (b) alert the Department that an affiliate is applying for prequalification independent of the parent company so that the Department can properly audit the financial statements of each applicant. It is not intended to allow or provide for a joint application. The application must be accompanied by an audited financial statement and an equipment list. First-time applicants must also provide resumes and letter of recommendation supporting the applicant's representation that it is qualified and capable of performing the type of work for which it is seeking qualification. The CAO reviews the application for completeness and checks various data bases to determine if the applicant and its affiliates have adverse reports from other contracting agencies. The Department's Internal Audit Section reviews the financial information provided with the application for purposes of developing the Current Ratio and Net Worth Factors for use in calculating the applicant's Maximum Capacity Factor. The Internal Audit Section also reviews the information on corporate subsidiaries provided in response to "Question 8" (Question 6 in 1989) on the application. The Department's Construction Office reviews the equipment and experience information provided with the application to develop an applicant's Ability Factor for use in calculating the applicant's Maximum Capacity Factor. The Internal Audit Section and the Construction Office report their conclusions to the CAO, which issues the Certificate of Prequalification (Certification) to the applicant. Where the Opinion Letter of the applicant's Certified Public Accountant, which must be included with the application, states that the financial statement was audited in accordance with General Accepted Accounting Principles, the Department can rely on the Opinion Letter and the financial statements submitted with the application, unless there is a reasonable basis for the Department to question the financial statements. Where the Opinion Letter identifies the entity and subsidiaries, if any, whose financial condition is reflected in the financial statement, it is the Department's practice and policy to issue the Certification in name of the entity whose financial condition is reflected in the financial statement as indicated by the Opinion Letter. Where the Opinion Letter indicates that the financial condition of both the parent company and subsidiaries are reflected in the financial statement, then the Department will issue the Certification in the name of the parent company and the generic term "subsidiaries" or "subsidiary". Neither the parent company nor the subsidiary would be qualified separately. Under the above circumstances, the Department would accept a bid submitted by the parent company without the subsidiary even though the bid blank had been issued in the name of the parent company and "subsidiary" or "subsidiaries". For example, a Certification was issued by the Department to "Balfour Beatty Construction, Inc. and subsidiary", the bid blank was issued in the same name but the bid was submitted by and awarded to Balfour Beatty Construction, Inc. There was at least one other instance where the Department followed a similar procedure. The Department's justification for this practice is that the parent company has control over its subsidiaries and could submit a bid on their behalf and enter into a contract with the Department that would bind the subsidiaries. Whereas, with the converse, the subsidiary or subsidiaries are normally without authority to submit a bid on behalf of the parent company or enter into a contract with the Department on behalf of the parent company. However, where a prequalified parent company gives proper written authorization to a subsidiary to submit a bid on its behalf and such authorization is attached to bid, then the Department would not consider such bid submitted by the subsidiary as irregular. Where a parent company relies on the assets and experience of its majority-owned subsidiaries in its application for prequalification to which it has access to, and control over, and the Opinion Letter indicates the parent company to be the entity whose financial condition is reflected in the financial statement, then the Department would certify the parent company in its name alone and allow the parent company to bid on Department projects in excess of $250,000.00. Furthermore, the Department would allow the parent company's subsidiaries to perform all of the work on the project for the parent company notwithstanding Standard Specification No. 8 limiting the percentage of work which the subcontractors are allowed to perform on a Department project to 49%. The Department does not consider subsidiaries performing work for a parent corporation on a Department project as subcontractors within the meaning of Standard Specification No. 8 and thus, a parent company could bid on a Department project in its own name and rely solely on its subsidiaries to perform 100% of the work on the project without violating Standard Specification No. 8. For example, VSM, Inc. could bid on a Department project and, if awarded the bid, could rely solely on VSM of Florida, Inc. to perform 100% of the work on the project. It was conceded by the Department that VSM of Florida, Inc. has the expertise, experience and equipment to perform all of the work bid for on the Project. Where the applicant's name on the face of the application does not exactly correspond with the name of the entity whose financial condition is reflected in the financial statement, then the Department will issue the Certification in the name of the entity whose financial condition is reflected in the financial statement as indicated in the Opinion Letter. VSM, Inc. is a Florida corporation that was incorporated in 1988. In 1988 VSM, Inc. formed two subsidiary corporations, VSM of Florida, Inc. and VSM of Virginia, Inc. The parent corporation, VSM, Inc., owns 80% of the stock in both VSM of Florida, Inc. and VSM of Virginia, Inc. Van Monroe is the sole stockholder, sole director and president of VSM, Inc. Van Monroe is also the sole director and president of VSM of Florida, Inc. The remaining 20% stock of VSM of Florida, Inc. is owned by Gregory Monroe, brother of Van Monroe. Gregory Monroe is also vice president of VSM of Florida, Inc. These corporations (VSM, Inc. and VSM of Florida, Inc.) are separate entities with each having a separate Federal Identification Number. Beginning in 1989, VSM, Inc. applied for Certification with the Department to qualify to bid on projects in excess of $250,000.00. In the application form (Question 6), the applicant is requested to: "List the following for all affiliated companies: (a) Name and Address; (b) States Qualified ; and (c) Explain in detail your connection with this company and whether or not this company is qualifying with FDOT. In response to that question, VSM, Inc. answered in pertinent part as follows: (a) VSM of Florida, Inc., P. O. Box 5761, Jacksonville, FL 32247 (58-2916127); (b) Florida and; (c) VSM, Inc. - 80% Stockholder, Gregory B. Monroe - 20% Stockholder (We would qualify VSM of Florida, Inc. as a subsidiary of VSM, Inc.). The Department issued the Certification on April 21, 1989 in the name of VSM, Inc. Each of the applications for renewal of the Certification issued on April 21, 1989 submitted on March 26, 1990, March 26, 1991 and March 30, 1992 requested basically the same information in Question 8, as had Question 6 in the original application, and the answers were basically the same as in the original application. The renewal applications submitted on March 26, 1990 and March 30, 1992 have both VSM, Inc. and VSM of Florida listed as applicants. The Department subsequently lined out VSM of Florida, Inc. on each of these renewal applications and issued the Certification to VSM, Inc. The reason being, that each contracting firm seeking Certification must file a separate application, and the Opinion Letter indicated that the entity whose financial condition was reflected in the financial statement was VSM, Inc. A Certification was issued to VSM, Inc. on April 30, 1990, April 10, 1991 and April 16, 1992, respectively in response to the above renewal applications for Certification. The Certification dated April 16, 1992 expanded the classes of work to be performed under the certificate to include Bascule bridge repair (rehabilitation) work. In each of the above years, Van Monroe, the president of both VSM, Inc. and VSM of Florida, Inc., consciously chose not to seek Certification for VSM of Florida, Inc. independently of VSM, Inc. because VSM, Inc. and its subsidiaries operate as an integrated operation and could not be separated. Beginning in 1990 and each year thereafter, when VSM, Inc. applied for renewal of its Certification with the Department, it included a consolidated financial statement which contained the financial condition of its two subsidiaries, VSM of Florida, Inc. and VSM of Virginia, Inc. The Department chose not to issue the Certification in the name of "VSM, Inc. and subsidiaries" for these years because the Department concluded that the Opinion Letter indicated that the only entity whose financial condition was reflected in the financial statement was VSM, Inc. Although the Department conceded that the Certification could possibly have been issued to "VSM, Inc. and subsidiaries", the Department contended that this would not have changed the result of the bid since under either situation, VSM of Florida, Inc. had not submitted written authorization from VSM, Inc. authorizing VSM of Florida, Inc. to submit a bid on behalf of VSM, Inc. Since 1989, both VSM, Inc. and VSM of Florida, Inc., after requesting and receiving permission from the Department, have used the same vendor (prequalification) identification number. Additionally, the names VSM, Inc. and VSM of Florida, Inc. have been used interchangeably on documents submitted to and received from the Department. The current Certificate of Capacity, required by the Department of all prequalified contractors, was issued in the name of VSM of Florida, Inc. On February 26, 1992 under cover of the bid blank issued to VSM, Inc. by the Department, VSM of Florida, submitted a bid on a Department project in Polk County, Job No. 16630-3601. Because this bid was third lowest bid, no objection or declaration of irregularity to this bid format was made by the Department. On May 27, 1992 under cover of the bid blank issued to VSM, Inc. by the Department, VSM of Florida, Inc. submitted a bid on a Department project in Gadsden County. The Department notified VSM, Inc. by form letter dated June 17, 1992 that the bid proposal had been taken apart and not been stapled back in the same order as when issued and that such errors or omissions could result in a future bid proposal being declared irregular. One of the items (Item 5) on this form letter states "the bidder's name is not as issued per their prequalification application on the front sheet (Bid Blank)". Item 5 was not checked or noted as a deficiency in the bid on the Gadsden County project along with the other noted problem because the name (VSM, Inc.) on the cover sheet had not been altered - it was the same as issued on the Certification. The Gadsden County project bids were posted on June 18, 1992 under the name "VSM,Inc." as irregular but with no reason stated for the irregularity and there is nothing in the minutes of the Department's Bid Review Committees indicating the reason for the irregularity. Again, the bid submitted by VSM of Florida, Inc. under cover of the bid blank issued to VSM, Inc. was not the low bid on the Gadsden County project. On May 27, 1992 VSM of Florida, Inc., under cover of a bid blank issued to VSM, Inc. by the Department submitted a bid on another Department project in Polk County, Job No. 16070-3501, the apparent low bid on the project and the bid in dispute here. The name of VSM, Inc. under which the bid blank was issued by the Department was not altered on the bid submitted by VSM of Florida, Inc. The bid as submitted by VSM of Florida, Inc. was signed by V. S. Monroe and G. B. Monroe as president and secretary, respectively of VSM of Florida, Inc. Although the bid did not contained written authorization from VSM, Inc. authorizing VSM of Florida, Inc. to submit the bid on behalf of VSM, Inc., there is sufficient evidence in the record to show that at the time of the bid submittal VSM, Inc. had knowledge of, consented to and authorized the bid submittal by VSM of Florida, Inc. Also, at the time of the bid submittal, VSM, Inc. and VSM of Florida, Inc. were under the impression (rightfully or wrongfully) that VSM, Inc. and VSM of Florida, Inc. had been previously prequalified jointly by the Department. By letter dated May 29, 1992, the Department advised VSM, Inc. that it needed to file a Disadvantaged Business Enterprise (DBE) affirmative action plan with the Department in order for its bid of May 27, 1992 to be considered responsive. The DBE plan was furnished by VSM of Florida, Inc. and approved by the Department. The Department also requested that VSM, Inc. submit a current capacity rating status so that the Department could determine if the current capacity of VSM, Inc. was such that it was still qualified to perform the work required by the Project. The current capacity rating status was filed by VSM of Florida, Inc. on June 3, 1992. On June 11, 1992, the Department's Technical Review Committee (TRC) recommended that the bid executed and submitted by VSM of Florida, Inc. under cover of the bid blank issued to VSM, Inc. be declared irregular based on the TRC's determination that VSM of Florida, Inc. was not a prequalified contractor. On June 16, 1992, the Department's Contract Awards Committee (CAC) unanimously adopted the recommendation of the TRC and declared the bid submitted under cover of the bid blank issued to VSM, Inc. to be irregular. The CAC voted to post an intent to award the bid on the Project to Leware. The Department rejected the bid submitted by VSM of Florida, Inc. under cover of the bid blank issued to VSM, Inc. on the basis that VSM of Florida, Inc. was not a prequalified contractor. The bid was rejected by the Department without any review of the Department's prequalification file of VSM, Inc., or without any review as to whether the irregularity could be cured by VSM, Inc. ratifying the action of VSM of Florida, Inc. by supplying the Department with written authorization for VSM of Florida, Inc. to submit the bid on behalf of VSM, Inc. There was no evidence that curing this irregularity would provide the Petitioner with such a competitive advantage that it would restrict or stifle competition or that curing this irregularity would violate any rule or statute. The intent to award the Project to Leware was posted on June 18, 1992. VSM, Inc., by and on behalf of its operating subsidiary, VSM of Florida, Inc., filed a timely initial protest to the intent fo award on June 23, 1992 and a timely formal protest on July 1, 1992.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is, accordingly RECOMMENDED: That the Department enter a Final Order awarding the contract for the construction of the Project to the Petitioner upon VSM, Inc. curing the technical deficiency in the bid by submitting to the Department authorization for VSM of Florida, Inc. to have submitted the bid on the Project on behalf of VSM, Inc. DONE and ORDERED this 12th day of November, 1992, in Tallahassee, Florida. WILLIAM R. CAVE Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 12th day of November, 1992. APPENDIX TO RECOMMENDED ORDER IN CASE NUMBER 92-4859BID The following constitutes my rulings pursuant to Section 120.59(2), Florida Statutes, on all of the proposed findings of fact submitted by the parties in this case. Rulings on Proposed Findings of Fact Submitted by the Petitioner Proposed findings of fact 1 - 4, 6 and 8 - 11 are adopted in substance as modified in the Recommended Order. Proposed findings of fact 5 and 7 are adopted in substance as modified in the Recommended Order, but see Findings of Fact 41 relating to reliance. Proposed Findings of Fact Submitted by the Respondent Proposed findings of fact 1 - 42 and 44 are adopted in substance as modified in the Recommended Order. Proposed finding of fact 43 is rejected as not being a finding of fact but more of an argument as to the weight to be given certain evidence. Rulings on Proposed Findings of Fact Submitted by the Intervenor, Leware 1. Proposed findings of fact 1 - 35 are adopted in substance as modified in the Recommended Order. COPIES FURNISHED: Ben G. Watts, Secretary Department of Transportation Haydon Burns Building 605 Suwannee Street Tallahassee, FL 32399-0458 Thornton J. Williams, Esquire General Counsel Department of Transportation Haydon Burns Building 605 Suwannee Street Tallahassee, FL 32399-0458 Allen P. Clark, Esquire CAVEN, CLARK, RAY and TUCKER 3306 Independent Square Jacksonville, FL 32202 George M. Meros, Jr., Esquire 106 College Avenue Tallahassee, FL 32301 Carolyn Holifield, Esquire Paul Sexton, Esquire Department of Transportation Haydon Burns Building 605 Suwannee Street Tallahassee, FL 32399-0458 Mary M. Piccard, Esquire CUMMINGS LAWRENCE & VESIMA 1004 DeSoto Park Drive Tallahassee, FL 32302
The Issue This case concerns a challenge to the validity of Rules 13A-1.001(12), 13A- 1.002(1)(b) and 13A-1.002(3) , Florida Administrative Code, pursuant to Section 120.56, Florida Statutes.
Findings Of Fact In the fall of 1988, the State of Florida, Department of Transportation (DOT) put out a Request for Proposals (RFP) as RFP-DOT-88-0l. Through this RFP the agency sought to acquire a new barrier and ticket toll collection system which would automate the toll collection operations and retrieval of audit data, having in mind increased reliability and performance. The project is principally one which envisions the purchase of commodities. It has an associated service component. Section 287.062(1)(e), Florida Statutes together with Section 287.073(3), Florida Statutes, established the basic authority for the award of RFP-DOT-88-01. The agency received responses in March, 1989, from three companies. The offerors were Petitioner and Intervenor and one other concern. The other company was AGS Informations, Inc. (AGS). Following evaluation DOT determined on May 18, 1989 to reject the Intervenor's proposal as nonresponsive. This rejection was followed by the Intervenor's notice of protest on Nay 25, 1989. A formal written protest was made on June 6, 1989. On July 31, 1989, Intervenor filed a notice of voluntarily dismissal of the formal written protest. This was addressed by the DOT final order of August 2, 1989 which dismissed the formal written protest. On November 21, 1989, DOT posted its intent to award a contract to Petitioner. This statement of intent to award was met by a notice of protest filed by Intervenor on November 27, 1989, followed by a formal written protest on December 6, 1989. The case was sent to the Division of Administrative Hearings for consideration and through response to a motion to dismiss the Hearing Officer in that case, DOAH Case NO. 89-6926B1D, entered a recommended order of dismissal. On January 22, 1990 DOT entered a final order dismissing Intervenor's petition and stating its intent to award the contract to Petitioner. An amendment to the January 22, 1990 order was made on February 21, 1990 reminding all concerned that the contract award was subject to review and approval by the Governor and Cabinet sitting as the State of Florida, Department of General Services to decide the propriety of the subject purchase which was an information technology resources purchase under Section 287.073, Florida Statutes. On February 21, 1990, DOT sent notice to the three offerors that it was rejecting all proposals submitted. As described in the notice of agency decision, DOT was operating on the basis that a further review of the proposals revealed that the proposals by AGS and Intervenor were nonresponsive. It went on to say that to have competitive offerors there must be two or more offers submitted by responsive and qualified offerors. In this instance DOT felt that it did not have two acceptable proposals and did not have a competitive offer. Because the commodities sought were available from more than one source, it had decided to withdraw its notice of intent to award which was contingent upon the approval of the Governor and Cabinet. On February 27, 1990, Petitioner gave a notice of protest of the DOT decision to reject all bids. This was followed by a formal written protest on March 9, 1990. Although the decision to reject all proposals was not opposed by Intervenor, the motion by the Intervenor to intervene in DOAH Case No. 90- 1583BID was granted allowing limited participation in support of the DOT decision to reject all proposals. That outcome tended to create the opportunity for Intervenor to participate in any re-advertisement for proposals. As revealed in the final hearing in DOAH Case No. 90-1583BID, DOT utilizes Chapter 13A, Florida Administrative Code, in the procurement process. Intervenor participated in the final hearing in DOAH Case NO. 90- 1583BID. The DOT decision to reject all proposals in which reliance upon the rules under challenge are perceived to support that decision has an adverse impact on Petitioner. By that arrangement Petitioner loses the opportunity for the contract. Additionally, it is placed in a disadvantaged position in that the particulars of its method of responding to the RFP have been revealed and are now known to the competitors who might be expected to utilize that information in a setting where a re-advertisement takes place. Under the circumstances, Petitioner filed its challenge to the existing rule on March 28, 1990. Intervenor sought the opportunity to intervene in this case on April 4, 1990, and that opportunity was granted on April 6, 1990. Intervenor intends to participate in any re-advertisements of the RFP. In his testimony at hearing William Monroe, Director of the Division of Purchasing for Respondent, established that in governmental purchasing the terms "offers" and "proposals" are synonymous. This opinion is accepted. Mr. Monroe also established that Respondent believed that it was implementing Section 287.012(15), Florida Statutes, when promulgating Rule 13A- 1.001(12), Florida Administrative Code. Through the promulgation of Rules 13A- 1.002(1)(b), and 13A-1.002(3), Florida Administrative Code, Respondent believed that it was implementing Section 287.062, Florida Statutes. Respondent interprets Section 287.062, Florida Statutes, to require an agency making a commodity purchase to use competitive sealed proposals in instances where invitations to bid are not used. Mr. Monroe in speaking for Respondent indicated that this interpretation gained support from the language set out in Section 287.001, Florida Statutes. According to Mr. Monroe the circumstance in which less than two responsive and qualified offerors respond to an RFP is one in which the procuring agency must reject all proposals or seek the approval from Respondent to negotiate with the one responsive offeror or where no responsive offerors were received to negotiate with someone whom the agency has chosen. Likewise, a sole source purchase negotiation must be approved by Respondent. Mr. Monroe's testimony, in speaking for Respondent, indicates that Respondent interprets the terminology within Section 287.062(2), Florida Statutes, "no competitive" to modify the words "bids" and "proposals." Thus, it is incumbent upon an agency to receive authority to negotiate in those instances where it receives less than two proposals submitted by responsive and qualified offerors who are responding to a RFP in acquiring commodities.
The Issue Whether the Department’s action to reject all bids submitted in response to DOT-RFP-20-5003-DAA, relating to asbestos abatement, demolition, and removal services, is illegal, arbitrary, dishonest, or fraudulent.
Findings Of Fact Stipulated Facts (verbatim) The Department is an agency of the State of Florida tasked with procuring the services for Districtwide Asbestos Abatement and Demolition and Removal Services for Right of Way property under the Department’s supervision by law. The Department published a bid solicitation for DOT-RFP-20-5003- DAA, seeking bids to provide District Five Asbestos Abatement and Demolition and Removal Services for FDOT. The RFP included specifications, qualification requirements, instructions on what would be required of responders, a bid price proposal sheet, and the award criteria. Cross Construction and Cross Environmental submitted bids in response to the RFP. Cross Construction’s and Cross Environmental’s bids were evaluated by the Department. There is no debate, challenge, or disagreement raised in the Petitions with regard to the Technical Scores submitted by the responding firms to the RFP, only disagreement on three pay items. On June 15, 2020, the Department’s Selection Committee reviewed and discussed the information presented as to the Technical and Pricing scores of the Responding firms, asked for an additional bid item analysis, and indicated that it would reconvene at a future date for a decision. On June 22, 2020, the Selection Committee reviewed, discussed, and confirmed the recommendation presented by the results of the Technical Review Committee scorings and the Project Manager’s Bid Price analysis and selected Cross Construction and Cross Environmental as Intended Awardees. The Selection committee also found that Johnson’s Excavation and Services Inc., [Johnson] and Simpson Environmental LLC [Simpson] were deemed non-responsive due to irregular, and unbalanced pay items prices. On August 24, 2020, the Department’s Selection Committee decided to cancel the Procurement with the intent to readvertise with adjustments to the Scope and Pricing Structure and decided to reject all proposals. Additional Findings of Fact The “three pay items” referenced in paragraph six of the stipulated facts are the items that ultimately caused the Department to reject all bids in the instant dispute. The three pay items are collectively referred to as mobilization pay items. The RFP directs that bids are to contain two parts. Part I is the technical proposal, and Part II is the price proposal. Section 30.3 of the RFP provides that proposers “shall complete the Bid Price Proposal Form No. 2 and submit [the form] as part of the Price Proposal Package … [and that] [t]he Procurement Office and/or the Project Manager/TRC will review and evaluate the price proposals and prepare a summary of its price evaluation.” Five bidders submitted proposals in response to the RFP. One bidder did not advance beyond the initial review phase because its technical proposal did not meet minimum bid standards. The remaining bidders were CCS, CES, Simpson, and Johnson. Price proposals submitted by each of the remaining bidders were evaluated by the Department. Section 3 of the RFP provides a general outline of the process associated with awarding the contract. The steps are: “Pre-Proposal Conference; Public Opening (Technical Proposals); Price Proposal Opening & Intended Award Meeting; and, Selection Committee Meeting Summarizing Evaluations and Determining Anticipated Award.” The agenda for the “Price Proposal Opening & Intended Award Meeting,” as established by the RFP, provides as follows: Opening remarks of approx. 2 minutes by Department Procurement Office personnel. Public input period – To allow a reasonable amount of time for public input related to the RFP solicitation. At conclusion of public period, the Technical evaluation scores will be summarized. Announce the firms that did not achieve the minimum technical score. Announce the firms that achieved the minimum technical score and their price(s) as price proposals are opened. Calculate price scores and add to technical scores to arrive at total scores. Announce Proposer with highest Total Score as Intended Award. Announce time and date the decision will be posted on the Vendor Bid System (VBS). Adjourn. Section 30.4 b. of the RFP provides that a proposer can be awarded a maximum of 30 points for its price proposal. This section also provides that “[p]rice evaluation is the process of examining a prospective price without evaluation of the separate cost elements and proposed profit of the potential provider.” On June 15, 2020, the selection review committee met publicly for the purpose of opening price proposals and announcing an intended award. Price proposals were opened, and the eligible bidders received the following price scores: CCS - 11.09; CES - 13.22; Johnson - 19.76; and Simpson - 30. In terms of total score, which combined both the technical and price scores, Simpson received a score of 113.00, which was the highest score, followed by CES (107.55), CCS (103.76), and Johnson (101.76). After opening and considering the price proposals of the respective bidders, the selection committee did not announce an intended award at the meeting on June 15, 2020, but instead requested that the project manager “do further analysis on the pay items for any potential imbalance.” The project manager, through a staff member, performed the additional analysis and determined that Johnson and Simpson submitted “irregular, unbalanced pay items” which resulted in their respective bids being deemed non- responsive and thus not eligible for award. The “irregular, unbalanced pay items” are the three mobilization pay items at issue in the instant matter, and are identified on the bid price proposal sheet as items AB200, AB201, and AB202. Simpson bid $400 for item AB200, $100 for item AB201, and $50 for item AB202. Johnson bid $250 for item AB200, $250 for item AB201, and $100 for item AB202. CCS bid $1 for item AB200, $1 for item AB201, and $1 for item AB202. CES bid $1 for item AB200, 75 cents for item AB201, and 50 cents for item AB202. The Department, in evaluating the bidders’ mobilization pay items, considered costs associated with abatement two structures, a 1,500 and 2,250 square feet structure respectively. For the 1,500-square-foot structure, CCS’ AB200 mobilization costs totaled $1,500. For the 2,250-square-foot structure, CCS’ AB201 mobilization costs totaled $2,250. For the 1,500-square-foot structure, CES’ AB200 mobilization costs totaled $1,500. For the 2,250-square-foot structure, CES’ AB201 mobilization costs totaled $1,687.50. For the 1,500-square-foot structure, Johnson’s AB200 mobilization costs totaled $375,000. For the 2,250-square-foot structure, Johnson’s AB201 mobilization costs totaled $562,500. For the 1,500-square-foot structure, Simpson’s AB200 mobilization costs totaled $600,000. For the 2,250-square-foot structure, Simpson’s AB201 mobilization costs totaled $225,000. On June 22, 2020, the selection committee reconvened and announced CCS and CES as intended awardees of the contract. The Department also announced at this meeting that Johnson and Simpson were “deemed non- responsive due to irregular, unbalanced pay item prices.” On June 24, 2020, Simpson filed a Notice of Protest wherein the company informed the Department of its intent to formally protest the intended award of contracts to CCS and CES. On or about July 6, 2020, Simpson filed with the Department its “formal written petition of protest.” Although Simpson’s formal protest is dated July 6, 2020, CCS and CES contend that Simpson’s protest was actually filed on July 7, 2020, thereby making the protest untimely by a day. The Department did not refer Simpson’s formal protest to DOAH for final hearing, but instead considered the issues presented by Simpson in its protest and then attempted to negotiate a resolution with Simpson, CCS, and CES. Those efforts were unsuccessful. The question of the timeliness of the formal bid protest filed by Simpson is not before the undersigned. Nevertheless, the undisputed facts as to Simpson’s protest, as demonstrated by the record herein, are as follows. On June 24, 2020, Simpson filed notice of its intent to protest the RFP. On June 29, 2020, CCS received notice that a bid protest was filed with respect to the RFP. On July 1, 2020, CES filed a public records request “for public records related to the bid protest made to the” RFP. On or about July 6, 2020, Simpson filed its formal written protest with respect to the RFP, and although the evidence is not clear as to the date, it is undisputed that the Department received affidavits from Simpson explaining the factual circumstances surrounding the filing of the company’s formal written protest. On July 15, 2020, the Department notified CCS and CES that “in response to the Formal Written Protest filed by Simpson Environmental Services, the Department will hold a settlement conference” on Friday, July 17, 2020. On July 21, 2020, Simpson, CES, and CCS notified the Department that they “reached an agreed upon settlement proposal.” On August 11, 2020, the Department, after considering the settlement proposal for several weeks, notified Simpson, CES, and CCS that the Department would discuss the RFP at a public meeting to be held on August 24, 2020. As previously noted, it was during the meeting on August 24, 2020, when the Department announced that all proposals received in response to RFP were rejected. CES, on or about July 1, 2020, submitted to the Department a public records request wherein the company sought a copy of documents related to Simpson’s protest. In response to the request, the Department provided CES a copy of the formal written protest filed by Simpson. It is undisputed that the initial copy provided to CES by the Department did not show either the date or time of receipt of the document filed by Simpson. At some point after the settlement conference, the Department provided to CES a date and time stamped copy of Simpson’s formal written protest. There was no evidence presented explaining the circumstances or the process which resulted in the Department providing different copies of Simpson’s formal written protest to CES, and the remaining evidence does not provide a sufficient foundation to reasonably infer that the Department acted with nefarious motives when providing different versions of the documents to CES. Simpson’s formal protest contains the following statement with respect to the price proposal that the company submitted in response to the RFP: Petitioner’s individual bid price items were based in fact, were reasonable and were in conformity with standard industry rates for similar asbestos abatement and demolition and removal projects. Petitioner’s bid price items were also patently similar to bid price items that Petitioner has previously submitted in response to past FDOT proposal requests that ultimately resulted in the corresponding contracts having been awarded to Petitioner. Indeed, Petitioner has a longstanding relationship with the FDOT as Petitioner has previously contracted with FDOT as a vendor performing asbestos abatement services on numerous projects over the course of the past eight years. Petitioner’s price items for bid proposals have remained consistent for each of its past projects with FDOT. Petitioner’s price items for the instant bid proposal did not differ or vary in any material aspect from those proposed by Petitioner for previous projects that FDOT has deemed reasonable. Michelle Sloan works for the Department as a district procurement manager, and was assigned to manage the instant RFP. Ms. Sloan testified that because Simpson protested the Department’s intended decision to award the contracts to CCS and CES, and specifically referenced in its protest “that their bid for mobilization was in conformance with industry standards, as well as previous bids submitted to the agency that were deemed responsive,” she conducted additional review of the Simpson and Johnson bids. Ms. Sloan testified that after reviewing the RFP, the price sheets related thereto, Simpson’s protest, and the additional analysis of the pay items conducted following the June 15, 2020, selection committee meeting, she concluded that material ambiguities existed in the RFP’s mobilization pay items and recommended to the district secretary that the Department “reject all [bids] and re-advertise with a revised pricing sheet and instructions.” On August 24, 2020, the selection committee, following public notice, accepted Ms. Sloan’s recommendation, rejected all proposals, and canceled the procurement with the “intent to re-advertise with adjustments to the Scope and Pricing structure.” A review of the credible evidence demonstrates a rational basis for the conclusions reached by Ms. Sloan and members of the selection committee. Exhibit C of the RFP is titled “Price Proposal/Detailed and Contractual Price Sheet.” The first page of this document provides a general description of the asbestos removal and abatement pay items. The general pay items are as follows: AB100 Fees [as] determined from the Department of Environmental Protection based upon regulated material. AB200 One-time fee necessary to mobilize for full isolation, per parcel, when abatement with isolation is required. AB300 Fees to be charged by square feet for preparation [of] structure before abatement can commence. AB400 Fees to be charged by square feet, to abate asbestos from various surfacing material such as ceiling, walls, beams, plaster, sheetrock and fireproofing using conventional containment methods. AB500 Fees to be charged either by square foot, linear foot or fittings to abate asbestos from various mechanical systems such as boilers, stacks ducts, fittings, pipes, flutes and flanges. AB600 Fees to be charged either by square foot, linear foot or fittings to abate asbestos from various mechanical systems such as boilers, stacks, ducts, pipe, fittings and jackets which involve the use of a Glove bag. AB700 Fees to be charged by square foot, to abate asbestos from various roofing materials such as cement roof shingles, flashing, rolled roof, felts, wood shingles and mobile home coating. AB800 Fees to be charged by square foot or piece to abate asbestos from various materials such as floor tile, mastic adhesive, sheet vinyl, carpet, wood sub- floor, concrete sub-floor, vibrator dampers, wallboard, metal ductwork and sinks with insulation and heat shields (light fixture). AB900 Fees to be charge[d] by landfill for asbestos disposal. The bid price proposal sheet, which is form number 2 of the RFP, provides a listing of specific pay items related to the general “AB ---” items listed in Exhibit C to the RFP. Below is an example of some of the specific pay items listed on the bid price proposal sheet: [See table on next page] Item Number Description (A) Estimat ed Quantit y Unit (B) Unit Pric e Total Bid Amount (A x B) ASBESTOS REMOVAL ABATEMENT AB200 Mobilization for structures less than 2,000 Sq. FT. 1 SQ. FT. AB201 Mobilization for structures [from] 2001 – 5000 Sq. FT. 1 SQ. FT. AB202 Mobilization for structures over 5001 Sq. FT. 1 SQ. FT. AB300 Mask and Seal 1 SQ. FT. AB401 Remove ACM plaster/lathe including all surface materials 1 SQ. FT. AB501 Remove insulation from fittings 1 LF. AB603 Remove insulation from boilers, stacks or ducts piping 1 LF. AB703 Remove roofing cement 1 SQ. FT. AB810 Remove carpet and mastic adhesive 1 SQ. FT. AB820 Remove sinks with insulation 1 SQ. FT. AB901 Non-Friable 1 SQ. FT. General pay item category AB200, as described on Exhibit C, does not reference a “unit of measurement,” but instead notes that items within this category are to be determined on a “one-time – per parcel” basis. When the AB200 general pay item category is compared to the specific pay items for this category enumerated on the bid price proposal sheet (i.e., AB200, AB201, and AB202), it is evident that the unit of measurement “square feet” is listed as the basis for calculating the bid amount for this item when no such unit of measurement is stated for this item on Exhibit C. Comparatively, general pay item categories AB300 through AB800 each expressly references a specific unit of measurement (i.e., square foot, linear foot, or by the “piece”), and these units of measurement carry over to and are consistently reflected on the bid price proposal sheet for the specific pay items enumerated therein. By inserting a unit of measurement (i.e., square feet) in the mobilization pay items listed on the bid price proposal sheet, when the general description on Exhibit C instructs that they are “one-time, per parcel” pay items, the Department created a material ambiguity in the bidding process.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is hereby Recommended that the Department of Transportation issue a final order in Case Nos. 20-4214 and 20-4216 finding that the rejection of all proposals in response to Request for Proposal RFP-DOT-20-5003-DAA was not illegal, arbitrary, dishonest, or fraudulent, and dismissing the two petitions. DONE AND ENTERED this 14th day of December, 2020, in Tallahassee, Leon County, Florida. S LINZIE F. BOGAN Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 14th day of December, 2020. COPIES FURNISHED: Douglas Dell Dolan, Esquire Florida Department of Transportation 605 Suwannee Street, MS 58 Tallahassee, Florida 32399-0458 (eServed) Richard E. Shine, Esquire Florida Department of Transportation 605 Suwannee Street, MS 58 Tallahassee, Florida 32399 (eServed) Brian A. Leung, Esquire Holcomb & Leung, P.A. 3203 West Cypress Street Tampa, Florida 33607 (eServed) Diane E. H. Watson, Esquire Cross Environmental Services, Inc. Post Office Box 1299 Crystal Springs, Florida 33524-1299 (eServed) Kevin J. Tibault, P.E., Secretary Department of Transportation Haydon Burns Building 605 Suwannee Street, MS 57 Tallahassee, Florida 32399-0450 (eServed) Sean Gellis, General Counsel Department of Transportation Haydon Burns Building 605 Suwannee Street, MS 58 Tallahassee, Florida 32399-0450 Andrea Shulthiess, Clerk of Agency Proceedings Department of Transportation Haydon Burns Building 605 Suwannee Street, MS 58 Tallahassee, Florida 32399-0450 (eServed)
The Issue The ultimate issues to be resolved in this proceeding are whether the Respondent should award a contract in accordance with an invitation to bid to the Petitioner, to some other bidder, or reject all bids and reissue an invitation. Petitioner contends that it was the low bidder in response to the invitation; that its bid was responsive; and to the extent that it was not responsive, any defects were of a minor sort which should be waived. Petitioner contends that the Respondent has previously waived irregularities such as existed in the Petitioner's bid and should therefore waive them in this case. The Respondent contends that the Petitioner's bid was not responsive, that the irregularities in Petitioner's bid are not minor, that any mistakes the Respondent has made in past acquisitions should not be repeated, and that the contract should be awarded to another company.
Findings Of Fact The Respondent issued an invitation to bid for a project known as the "Animal Science/Dairy Science Building" at the University of Florida. The project was given No. BR-108 by the Respondent. Petitioner was the lowest bidder in response to the invitation. The next lowest bidder, Charles R. Perry Construction Company, submitted a bid approximately $37,000 higher than Petitioner's bid. Perry has not filed any formal protest nor intervened in this proceeding. Petitioner is a responsible contractor and has in the past entered into construction contracts with the Respondent. Petitioner's bid was rejected by the Respondent. The Petitioner protested the rejection of its bid in a timely manner. Paragraph "B-15" of the bid specifications provides in pertinent part, as follows: In order that the Owner may be assured that only qualified and competent sub- contractors will be employed on the project, each Bidder shall submit with his Proposal a list of the subcontractors who would perform the work for each Divi- sion of the Specifications as indicated by the "List of Subcontractors" form contained in these Specifications... only one subcontractor shall be listed for each phase of the work. * * * No change shall be made in the list of subcontractors, before or after the award of a contract, unless agreed to in writing by the Owner. Section "B" of the invitation for bid provided space for the bidder to list the name and address of subcontractors for the roofing, masonry, plumbing, mechanical, electrical, meat processing equipment, and controls and instrumentation phases of the project. In Section "B" of its bid, Petitioner listed two subcontractors for the plumbing, mechanical, and controls and instrumentation phases of the project. Listing two subcontractors does not comport with the bid specification requiring that only one subcontractor be listed for each phase. Petitioner listed two subcontractors because one of the subcontractors submitted a proposal to Petitioner only fifteen minutes prior to the time when the bid had to be submitted, and Petitioner was unsure of whether the last-minute proposal included all of the work that the Petitioner anticipated would be required. In addition, Petitioner felt that one of the subcontractors may not have been acceptable to the Respondent. The requirement that bidders list only one subcontractor for each phase of a project helps to discourage "bid shopping." Bid shopping is a practice whereby a contractor who receives a bid from a subcontractor approaches another subcontractor with that bid and encourages the other subcontractor to reduce its price. If the other subcontractor responds, this reduced price can be taken back to the original subcontractor. The original subcontractor is then confronted with the choices of either lowering its bid or losing the project. Bid shopping that occurs after a bid has been accepted by the owner does not benefit the owner. It benefits only the bidder, who is able to reduce its costs and therefore increase its profit. Requiring that one subcontractor be listed for each phase cannot serve to completely eliminate bid shopping. A contractor could still bid shop by listing itself as the subcontractor, then after winning the contract shop between several subcontractors. A contractor could also bid shop by changing subcontractors after the bid award. In either case, however, the contractor would need to secure the approval of the owner. The practice is thus discouraged. If a bidder lists two subcontractors for a phase of the project, that bidder would have an advantage over those who listed only one subcontractor. Listing two subcontractors enables the bidder to make a choice as to the best subcontract bid at a time later than the choice is made by bidders who list only one subcontractor. In addition, listing two subcontractors makes it easier for the bidder to engage in bid shopping, which would be more difficult for bidders who listed only one subcontractor. Paragraph "B-24" of the bid specifications for this project provides in pertinent part: The Contract will be awarded . . . to the lowest qualified bidder pro- vided his bid is reasonable and it is in the best interest of the Owner to accept it. * * * The Owner reserves the right to waive any informality in bids received when such waiver is in the interest of the Owner. The listing of two subcontractors for phases of the project is not a mere informality in the bid. It is directly contrary to Paragraph "B-15" of the bid specifications. It would not be in the interest of the owner to accept a bid in which two subcontractors are listed for phases of the project. The integrity of the acquisition process would be damaged by allowing such a deviation because a bidder who listed two subcontractors would have gained an advantage over bidders who complied with the bid specifications. It is not in the best interest of the Respondent to waive the defect in the Petitioner's bid. On at least two prior occasions, the Respondent awarded contracts to bidders who listed more than one subcontractor per phase of the work. One of these projects was for a gymnasium at Florida Atlantic University (Project No. BR-603). Another was for a window replacement project at Florida State University (Project No. BR-342). In at least three other projects, the Respondent awarded contracts where the bidder failed to list the name of any subcontractor for one or more phases of the work. These were for the cancer center at the University of South Florida (Project No. BR-569), the student housing facility at the University of South Florida (Project No. BR-576), and an expansion project at Florida A & M University (Project No. BR-343). The bid specifications for all of these projects were not offered into evidence; however, the Respondent had utilized the same specifications as required in this project at all pertinent times. Failing to list any subcontractor for a phase of a project constitutes approximately the same defect in a bid response as listing two subcontractors. It provides even greater opportunities for bid shopping and an advantage to the bidder over those who list subcontractors as required by the specifications. In several other projects, it appears that the Respondent has awarded contracts to bidders whose bids contained defects of the same magnitude, but a different sort than the listing of two subcontractors. It does not appear that the Respondent has awarded contracts where bidders have listed more than one subcontractor, no subcontractor, or otherwise violated bid specifications because of any policy or because of any expressed waiver of the defect. Rather, it appears that the Respondent has not adequately policed bids to determine responsiveness to the bid specifications. This is especially true with respect to the listing of subcontractors. It appears that no one on the Respondent's staff took the responsibility to consider whether one subcontractor was listed for each phase of a project as required in the specifications. The only policy that the Respondent established was a policy of being too lax in examining bids. The Petitioner did not list two subcontractors for various phases of this project because of any reliance on past conduct of the Respondent. Petitioner's agent overlooked the bid requirements in Preparing its bid response. In prior bids submitted by the Petitioner in response to bid invitations issued by Respondent, Petitioner listed only one subcontractor, as required. Generally, unless it is otherwise required, Petitioner prefers to list two subcontractors because of the flexibility it provides to the owner and to Petitioner. Petitioner was not aware that Respondent had previously awarded contracts to bidders who listed more than one subcontractor for a phase of the work when it submitted its bid in this instance.
Findings Of Fact On April 1, 1985, Respondent, Florida Department of Law Enforcement (FDLE), gave notice to thirty vendors that it would receive competitive sealed bids on Bid Number 84-67 for the following commodities: eight computer binder cabinets 36x18 5/8x71 Putty/Black, three hundred single point binder hooks, six hundred 10" steel reinforced binder posts. The bids were to be filed in Tallahassee, Florida, no later than 11:00 a.m., April 16, 1985. The Invitation to Bid included General Conditions, Special Conditions and technical specifications describing the dimensions and capacities of the desired equipment. Of special significance was the technical specification that the single point binder hooks be "[c]apable of supporting up to 6 inches of llx14 7/8 20 lb. computer paper." Paragraph 6 of the General Conditions provides as follows: 6. MANUFACTURERS' NAMES AND APPROVED EQUIVALENTS: Any manufacturers' names, trade names, brand names, information and/or catalog numbers listed in a specification are for information and not intended to limit competition. The bidder may offer any brand for which he is an authorized representative, which meets or exceeds the specification for any items(s) [sic]. If bids are based on equivalent products, indicate on the bid form the manufacturer's name and number. Bidder shall submit with his bid, cuts, sketches and descriptive literature and or complete specifications. Reference to literature submitted with a previous bid will not satisfy this provision. The bidder shall also explain in detail the reason(s) why the proposed equivalent will meet the specifications and not be considered an exception thereto. The State of Florida reserves the right to determine acceptance of items(s) [sic] as an approved equivalent. Bids which do not comply with these requirements are subject to rejection. Bids lacking any written indication of intent to bid an alternate brand will be received and considered in complete compliance with the specifications as listed on the bid form. The purchaser is to be notified of any proposed changes in (a) materials used, (b) manufacturing process, or (c) construction. However, changes shall not be binding upon the State unless evidenced by a Change Notice issued and signed by the purchaser. (Emphasis added.) Paragraph 7 of the General Conditions imposed the following duty upon all bidders: 7. INTERPRETATIONS: Any questions concerning conditions and specifications shall be directed in writing to this office for receipt no later than ten (10) days prior to the bid opening. Inquiries must reference the date of bid opening. No interpretation shall be considered binding unless provided in writing by the State of Florida in response to requests in full compliance with this provision. Of the thirty vendors given an opportunity to submit bids, only two did so. They were Petitioner, Pro Tech Data (PTD or Petitioner), and Office Systems Consultants (OSC). Their bids were in the amounts of $4,645 and $5,244, respectively. After reviewing the bids, and consulting with both bidders, the director of the agency's Division of Criminal Justice Information Systems, Mark Scharein, determined that Petitioner's bid was nonresponsive for not meeting specifications and was accordingly rejected. The bid was then awarded to OSC, the second lowest bidder, on May 3, 1985. That precipitated the instant proceeding. In its bid response, PTD listed "Dennison Monarch #7830" as manufacturer and model number for the single point binder hooks. Petitioner also submitted a Dennison Monarch catalogue with its bid response. When FDLE examined the catalogue to ascertain the specifications of the hooks, it found no model number 7830. Indeed, the closest item matching this number was model number 7830-22 which referred to shelf supports, an item not solicited in the bid proposal. After consulting with PTD, it was determined that the use of model number 7830 was in error, and that Petitioner had intended to use model number 7802-30. Its request to amend the bid response was denied. Even if the bid proposal had contained the correct model number, the binder hooks in model number 7802-30 did not meet specifications. The product description of that model carries the following limitation: "Can accommodate a few sheets of paper or a stack of data 4" thick." In addition, at hearing PTD's representative conceded that the manufacturer did not recommend hanging six inches of paper from that model binder hook. This was inconsistent with FDLE's specific requirement that such hooks be "[c]apable of supporting up to 6 inches of . . . computer paper." OCS submitted product designations which conformed in all material respects to the specifications and conditions required by the bid proposal. Although PTD suggests that OCS's binder hooks do not support six inches of computer paper, .OCS's bid response reflects that they do, and there was no evidence to contradict this representation.
Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that Bid No. 84-67 be awarded to Office Systems Consultants, and that Petitioner's bid protest be DENIED. DONE and ORDERED this 16th day of August, 1985, in Tallahassee, Florida. DONALD R. ALEXANDER, Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, FL 32301 (904)488-9675 Filed with the Clerk of the Division of Administrative Hearings this l6th day of August, 1985.
The Issue Whether Respondent's action to reject all bids submitted in response to ITB 13-803-206, relating to the removal and replacement of the public address system at Pinellas Park High School, is illegal, arbitrary, dishonest, or fraudulent, as alleged in the Amended Petition.
Findings Of Fact On March 4, 2013, ITB was issued by Respondent for work related to the removal and replacement of the public address system at Pinellas Park High School in Largo, Florida. According to the Special Conditions portions of the ITB, the "scope" of the project is to "[p]rovide labor and materials to remove and replace the auditorium sound system as per plans and specifications by Keane Acoustics, Inc." The ITB was assigned bid number 13-803-206 by Respondent. Bids for the contract were to be submitted to Respondent by 3:00 p.m., April 11, 2013. Bids for the project were timely received from two companies. The first company, Becker Communications, Inc., d/b/a BCI Integrated Solutions (BCI), submitted a bid in the amount of $130,756.66. Petitioner submitted a bid in the amount of $116,000.00. There is a section of the ITB titled "special conditions." The special conditions provide in part that "[t]his is an ALL or NONE bid [and] [t]he entire contract shall be awarded to the lowest responsive and responsible bidder meeting the specifications." On April 22, 2013, Respondent posted a notice advising of its intent to award the contract to BCI. Although Petitioner submitted the lowest bid, Respondent determined that Petitioner's bid was non-responsive because the bid failed to include "proof of 5 years [of] experience with this type of work" as required by the special conditions of the ITB. Petitioner interpreted this provision as requiring five years of experience as a certain type of general contractor, which Petitioner had, whereas Respondent intended for the ITB to convey that five years of experience related to the removal and installation of audio equipment was the desired type of experience. Petitioner's failure to respond to the ITB in the manner contemplated by Respondent was a technical, nonmaterial irregularity.1/ Numbered paragraph six of the General Terms & Conditions of the ITB provides in part that Respondent "expressly reserves the right to reject any bid proposal if it determines that the . . . experience of the bidder, compared to work proposed, justifies such rejection." On April 24, 2013, Petitioner provided to Respondent a notice advising of its intent to protest the award of the contract to BCI. On May 3, 2013, Petitioner filed its formal protest challenging Respondent's intended action of awarding the contract to BCI. Petitioner's formal protest enumerated several grounds. Of particular concern to Respondent were Petitioner's assertions that the ITB was "inconsistent with Florida law since bidders [were] not required to submit a List of Subcontractors by the time of opening bid"2/ and that provisions of the ITB were ambiguous with respect to the type of experience required to qualify for bidding.3/ Prior to receiving Petitioner's protest, Respondent was unaware of the fact that its bid specifications governing the disclosure of subcontractors did not comply with Florida law. Upon consideration of Petitioner's grounds for protest, Respondent determined that the ITB, as alleged by Petitioner, failed to comply with section 255.0515, Florida Statutes (2012),4/ and that there was ambiguity in the language regarding the experience requirements for bidders.5/ Respondent refers to the problems with the ITB as "procedural errors." These procedural errors will be referred to herein as "irregularities" as this term is more in keeping with the nomenclature of this area of jurisprudence. Given the ITB's irregularities, Respondent decided to reject all bids. In explaining Respondent's rationale for rejecting all bids, Michael Hewett, Respondent's Director of Maintenance,6/ testified that "the [irregularities] were such that [they] potentially could give an unfair advantage to one bidder over another." As for the issue related to the requirements of section 255.0515, Mr. Hewett explained that neither of the two bidders submitted a listing of subcontractors. It would have been competitively disadvantageous to BCI if Petitioner were able to successfully argue that BCI should be disqualified for failing to provide a listing of subcontractors when Petitioner also failed to provide such listing. During the same approximate time that the ITB in the present case was issued, Respondent issued an ITB for nearly identical work to be performed at one of its other facilities (Palm Harbor). In all material respects, the Palm Harbor ITB was identical to the one at issue herein. Unlike the present case, BCI was the sole bidder for the Palm Harbor project and this distinguishing fact reasonably explains why Respondent did not reject BCI's bid for the Palm Harbor Project even though the ITB therein was plagued with the same irregularities found in the present case.7/
Recommendation Upon consideration of the above findings of fact and conclusions of law, it is RECOMMENDED: That the Pinellas County School Board enter a final order finding that the rejection of all bids submitted in response to ITB 13-803-206 was not illegal, arbitrary, dishonest, or fraudulent, and dismissing Tamco Electric, Inc.'s instant protest. DONE AND ENTERED this 16th day of October, 2013, in Tallahassee, Leon County, Florida. S LINZIE F. BOGAN Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 16th day of October, 2013.
The Issue This case considers whether Petitioner's response to Invitation to Bid, No. 94-014, as revised, issued by the Respondent, is responsive to the terms of the Invitation to Bid. If Petitioner is found responsive, then the question is raised whether Petitioner has offered the lowest and best response to the invitation to bid.
Findings Of Fact On May 26, 1994, Respondent provided a memorandum to prospective vendors concerning Bid No. 94-014, as revised. This memorandum informed the prospective vendors that the new bid due date was June 6, 1994. The memorandum attached the bid instructions. Under general conditions to the invitation to bid the prospective vendors were reminded in Paragraph 7 that the Respondent could ". . . reject any or all bids or waive any minor irregularity or technicality in bids received." Under the heading "Special Provisions" prospective vendors were informed that "The charge per 1,000 for individual items under Exhibit A shall be the rates for the contract with the successful bidder." The prospective bidders were instructed as follows: REQUIRED ITEMS TO BE SUBMITTED WITH BID: The bidder must complete all required items below and submit as part of the bid package. Any bid in which these items are not used or in which these items are improperly executed, may be considered non-responsive and the bid may be subject to rejection. Among the items to be submitted with the bid was Exhibit A. The bidders were informed about the process of EVALUATION/AWARD. There it was stated: Bids will be evaluated and awarded on an all or none basis to one bidder. Award will be based on the total costs of four (4) theoretical jobs (See Exhibit B-Bid Total) requiring varying services and on the bidder's qualifications to best serve the Department's needs. The prospective bidders were then reminded a second time that: "THE DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION RESERVES THE RIGHT TO REJECT ANY AND ALL BIDS AND TO WAIVE ANY MINOR IRREGULARITIES IN BIDS RECEIVED." Within Exhibit A to the bid document was a category referred to as "Tabbing", calling for the charge per 1,000 for that service. Within Exhibit B under the fourth theoretical job was a requirement to quote the subtotal cost for 200,000 newsletter preparations to include "Tabbing." Three vendors submitted responses to the invitation to bid. Those responses were opened on June 6, 1994. The vendors who responded were Petitioner, Educational Clearinghouse, Inc. and Mail Masters of Tallahassee, Inc. In the subtotal for costs for 200,000 newsletter preparations, in activity four, concerning theoretical jobs, found within Petitioner's Exhibit B to the response to the invitation to bid, Petitioner made a mistake. It misplaced the decimal point and described the subtotal cost for 200,000 newsletter preparations as $73.80 instead of $7,380.00. Respondent characterized this as a typographical error or nominal mistake. In fact, this error constituted a minor irregularity which did not preclude the ability to understand Petitioner's response so that it might be compared to the responses by the competition. Petitioner made a second error. This error occurred when Petitioner failed to indicate the amount that it would charge per 1,000 for "Tabbing" within Exhibit A. Respondent did not consider this to be a minor irregularity and rejected Petitioner's bid as non-responsive for the failure to include a quotation for the charge per 1,000 for "Tabbing." This resulted in the intent to award the contract to Educational Clearinghouse, Inc. whose bid total for the four theoretical jobs under Exhibit B was $9,137.25 compared to Petitioner's bid total of $8,374.62. In preparing Exhibit B, activity four, Petitioner included a theoretical charge for "Tabbing" in the amount of $8.00 per 1,000. Petitioner contends that the $8.00 per 1,000 found within that entry may be correlated with the missing information concerning "Tabbing" in Exhibit A to its response to the invitation to bid. In the instructions to the vendors, Respondent has informed the vendors that the charge per thousand for individual items identified in Exhibit A constitutes the rate that the Respondent would expect to pay under a contract with the successful bidder. By contrast, the function of the information provided in Exhibit B is for purposes of awarding the contract based upon total costs of the four theoretical jobs and on the basis of the vendor's qualifications to best serve the Respondent's needs. Although not stated in the invitation to bid it can be inferred that similar references within Exhibits A and B, such as the reference to "Tabbing", calls for a comparable price to be set forth for the item in both Exhibit A and Exhibit B. Otherwise vendors would have the opportunity to quote low prices in completing Exhibit B as a means to win the cost comparison with their competitors for purposes of the award and then have the opportunity to charge higher costs per 1,000 as reflected in Exhibit A when establishing the charges for the contract with the Respondent following the competition contemplated in the comparison of the theoretical bid total under Exhibit B. Therefore, it would be reasonable for the Respondent to expect that the Petitioner would charge $8.00 per 1,000 for "Tabbing" under a contract between the Petitioner and Respondent based upon information that was set forth in the response to Exhibit B, activity four, "Tabbing." In summary, Petitioner's oversight in leaving out reference to the tabbing charge in Exhibit A does not affect the comparison of bid responses as contemplated by the instructions to the vendors, a function performed by comparing the respective Exhibits B. Otherwise, Respondent may gain the necessary understanding of Petitioner's charge per 1,000 for "Tabbing" as contemplated in instructions concerning Exhibit A as a means for entering into the contract. This understanding is achieved by transposing the $8.00 per 1,000 "Tabbing" quotation in Exhibit B to the "Tabbing" charge within Exhibit A as $8.00 per 1,000. With this adjustment, Modern Mailers, Inc. is the lowest responsive bidder and best able to serve Respondent's needs pertaining to Invitation to Bid No. 94-014, as revised.
Recommendation Based upon the findings of fact and the conclusions of law reached, it is, RECOMMENDED: That a final order be entered which finds that Petitioner is a "qualified" and "responsible" bidder who is the lowest and best responsive bidder to Invitation to Bid, No. 94-014, as revised and is entitled to the award of the contract contemplated by that invitation to bid. DONE and ENTERED this 8th day of September, 1994, in Tallahassee, Florida. CHARLES C. ADAMS Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 8th day of September, 1994. APPENDIX The following discussion is given concerning the proposed findings of fact of the Parties: Petitioner's Facts: Paragraph 1 is subordinate to facts found. Paragraph 2 is not necessary to the resolution of the dispute. Paragraphs 3 through 5 are subordinate to facts found. Paragraphs 6 and 7 are rejected to the extent that they are intended to establish an excuse for the Petitioner not providing information related to the cost for tabbing called for in Exhibit A in the invitation to bid. Paragraph 8 is subordinate to facts found. Paragraphs 9 through 12 are not necessary to the resolution of the dispute. Paragraph 13 is subordinate to facts found. Paragraph 14 is rejected to the extent that it suggests that Petitioner may amend its response to the invitation to bid to specifically set forth the amount attributable to the tabbing charges per 1,000 in Exhibit A. Nonetheless one may infer that the cost per 1,000 for tabbing is the same as is set forth in Exhibit B. Paragraphs 15 through 17 are subordinate to facts found. Paragraph 18 constitutes legal argument. Respondent's Facts: Paragraph 1 is subordinate to facts found. Paragraph 2 is contrary to facts found Paragraph 3 is rejected in fact and law. Paragraph 4 is rejected in the suggestion that the Petitioner does not have the ability to perform the contract. COPIES FURNISHED: Daniel W. Dobbins, Esquire Callahan & Dobbins 433 North Magnolia Drive Tallahassee, FL 32308 Vytas J. Urba, Esquire Department of Business and Professional Regulation 1940 North Monroe Street Tallahassee, FL 32399-0792 Jack McRay, General Counsel Department of Business and Professional Regulation 1940 North Monroe Street Tallahassee, FL 32399-0792 George Stuart, Secretary Department of Business and Professional Regulation 1940 North Monroe Street Tallahassee, FL 32399-0792 Informational Copies: Ronald W. Brooks, Esquire Brooks and LeBoeuf, P.A. 863 East Park Avenue Tallahassee, FL 32301 Joan Reeves, Vice President Educational Clearinghouse Post Office Box 3951 Tallahassee, FL 32315
The Issue The following issues were raised in the challenge of the award of the bid: Did Harris/3M fail to comply with Special Condition 28 of the Invitation to Bid, which required each bidder to provide references from two customers having similar equipment? Did the Department request a demonstration of the bid equipment under Special Condition 15? If such a demonstration was requested, did Harris/3M comply with the request? Were the machines bid by Harris/3M available under terms of General Condition 4(d)? Did the machines bid by Harris/3M comply with General Condition 4(f) requiring that the equipment bid carry the Underwriter's Laboratory listing? In response to Harris/3M's Motion for Directed Verdict on issue number 5, the Hearing Officer granted the motion on a finding that no evidence had been presented on this issue by the Petitioner. The Petitioner's compliance with the specifications was not at issue.
Findings Of Fact On or about December 15, 1986, the Department issued and advertised its Invitation to Bid 3162-86 related to the acquisition of 15 microfilm reader/printers for use in searching, reading and printing motor vehicle documents which had been microfilmed by the Department of Highway Safety. Microfilm reader/printers are essentially units of hardware into which cartridges of microfilm are inserted and the microfilm is passed through a camera which reflects the images of the microfilm onto a screen from which information can be read and copies printed. The Invitation to Bid required that the equipment must have a "controller," a device for automatically locating specific microfilm documents by the use of coded information or "blips" on the film. On or about January 5, 1987, responses to the Department's bid were submitted by Petitioner OSC and Intervenor, Harris/3M, together with bids from other bidders whose bids are not an issue in these proceedings. All bids were opened on January 5, 1987. The equipment bid by Harris/3M was the Model MFB1100 Reader/Printer with a "page search" kit or controller. Special Condition 28 of the Invitation to Bid states: "28. REFERENCES The bidder shall supply with his bid the names, addresses and telephone numbers of two references for whom the bidder has previously provided similar equipment being bid. If the bidder is unable to provide satisfactory references to the Department, the Department may, at its discretion, reject the bidder's bid if it determines that a responsive offer in full compliance with the bid speci- fications and conditions was not submitted. Failure to supply the references as required may result in rejection of the bid." (e.s.) Harris/3M provided two references in satisfaction of Special Condition Both of the references had versions of the Model MFB1100; however, neither of the references had the "controller" or page search kit, which was called for in the Invitation to Bid. Special Condition 28 was drafted by Merelyn Grubbs. According to Ms. Grubbs, the purpose of this requirement was to assure the Department that the bidder was responsible. "Similar" equipment is sufficient to assess the bidder's responsibility based upon machines made by the same manufacturer which performed essentially the same function. The MFB1100 without a page search kit is a "similar" machine. The two references provided were sufficient. Special Condition 15 states: DEMONSTRATIONS After opening of bid and prior to award of bid, the apparent low responsive bidder may be required to demonstrate to the Division of Administrative Services the equipment he proposes to furnish. If requested, a "working model" of the equipment bid and to be supplied in compliance with these specifications must be demonstrated in Tallahassee, Florida, within seven (7) calendar days from receipt of notification. If apparent low responsive bidder cannot successfully execute the demonstration, the Department shall revert to the next low responsive bidder and request demon- stration, continuing through the list of responsive bidders until a successful demonstration is achieved, the list of responsive bidders is exhausted or it is in the State's best interest to terminate the bid process. Demonstrations to be furnished at no expense to the Department." On January 7, 1987, Mr. Ray Boetch, the supervisor of the division within the Department of Highway Safety where the reader/printers would ultimately be used, wrote a memorandum to Merelyn Grubbs requesting that a demonstration be made on the Harris/3M Model MFB1100 Reader/Printer prior to the awarding of the bid. Mr. Boetch also discussed the matter with Ms. Grubbs indicating his primary concern was verifying the quality of the prints produced by the machine and whether it could print half pages. Ms. Grubbs spoke with Nick Vuillemot of Harris/3M about a demonstration of the equipment in Tallahassee. In these discussions, Harris/3M offered to fly representatives of the Department to St. Paul, Minnesota, the home office of the manufacturer, for a demonstration of the equipment. This was because Harris/3M had only two prototypes of the equipment and it was more economical for Harris/3M to fly Department personnel to Minnesota for purposes of the demonstration than to disassemble, ship to Tallahassee and reassemble the prototype for a demonstration. The Department declined to accept Harris/3M's offer. The Department accepted instead a demonstration of a Model MFB1100 without the controller or page search kit at the Division of Elections in Tallahassee, Florida. The MFB1100 without controller does not meet the specifications in the Invitation to Bid. The "controller" or page search kit is of modular construction in the MFB1100, which can be ordered with or without the controller or page search kit. However, the bid specifically calls for a reader/printer with a page search device. Following the demonstration of the MFB1100 without page search capability, the Department officially posted its bid tabulations on January 12, 1987, designating Harris/3M as the low and responsive bidder and OSC was the next low and responsive bidder. Item 4 (d). Conditions and Packaging of the General Conditions of the Invitation to Bid provides as follows: It is understood and agreed that any item offered or shipped as a result of this bid shall be new, current standard production model available at the time of bid. (e.s.) Item 18. Delivery Schedule of the special conditions required delivery of the items bid within 30 days of the bid award or, in the alternative, a substitute item acceptable to the Department at no cost to the Department. The bid submitted by Harris/3M certified that delivery of all 15 units would be delivered within 30 days after receipt of a purchase order. Although the Harris/3M Model MFB1100 Reader/ Printer without page search had been on the market for a number of months prior to the issuance of the Invitation to Bid, the Model MFB1100 with page search had not been authorized for sale by the manufacturer until late November 1986. At the time demonstration was requested, only two prototypes existed of the MFB1100 with page search capability. As of the date of the hearing on February 11, 1987, no Model MFB1100 Reader/Printers with page search capability had been installed in any customer location within the United States. The Petitioner did not present any evidence to support its claim that the MFB1100 Reader/Printer with page search did not have a UL listing.
The Issue The issue is whether Kelly Services is the lowest responsive bidder on Bid No. 89-23 and should be awarded the bid.
Findings Of Fact On June 2, 1988, the School Board of Bay County issued Bid Request No. 89-23 for garbage collection services at thirteen locations. A quotation sheet was included in the bid package. The quotation sheet indicated the thirteen locations with a blank next to each location and a dollar sign in front of each blank where each bidder was to indicate its average monthly total charge for each location. There was also a quotation schedule where the bidder was to indicate the calculations which went into the total bid for each location. The bid request provided: The Board reserves the right to waive formalities and to reject any and all bids or to accept any bid or combination of bids deemed in the Board's best interest and the decision of the Board will be final. Bidders desiring that their bid be considered on an all-or-none basis, either in whole or part, shall so indicate. It is the intent of this bid request to secure prices and establish contracts for garbage collection services for the twelve schools specified herein and the District Maintenance Department. Awards will be made by location and will be based on an average monthly total charge as calculated on the quotation sheet. The bids were opened at 10:00 am., June 13, 1988, at the offices of the Bay County School Board. Three completed bid packages were submitted. Kelly Services, Argus and M&O each submitted a completed bid quotation sheet containing the bid for each location. M&O also submitted a letter which stated: We would like to submit this bid on an all- or-nothing basis as specified in paragraph four of the cover letter to the bid. For an estimated cost of $3,391.84. The quotation sheet and quotation schedule submitted by M&O did not reflect the all-or-nothing bid amount. Instead, the quotation sheet and quotation schedule showed a total bid of $3,738.24 when calculated by location. Based on the bids submitted by each bidder as shown on the quotation sheet add quotation schedules, Kelly Services was low bidder on five locations (Callaway, Tyndall, Waller, Southport, and Cedar Grove) ; Argus was low bidder on six locations (Parker, Hiland, Haney, Mosley, Beach and Merritt Brown); and M&O was low bidder on two locations (West Bay and the District Maintenance Department). Prior to the deadline for submitting bids, John Harrison, Purchasing Agent for the Board, responded to an inquiry from M&O by advising M&O that it could submit two bids, one as specified in the Bid Request by location and one as an all-or- nothing bid. No other bidders were advised that they could submit two bids. At the bid opening, M&O did not submit a quotation sheet or schedule for its all-or-nothing bid. A bid which did not have a breakdown per dump per container per facility would not be acceptable to the Board and does not meet the specifications in the Bid Request. The breakdown per dump per container per location is necessary to verify proper invoicing for specific locations on months when there is a change in the number of dumps or containers at that location. After opening the bids, the Board compiled the low bid for each location and then totaled that list. That total of $3,606.09 was greater than the all-or-nothing bid by M&O. Because M&O's all-or-nothing bid failed to meet the specifications by not having a location breakdown the Board contacted M&O to determine if its "estimated" bid was firm and to request a breakdown on the quotation schedule form for the all- or-nothing bid. On June 15, 1988, two days after the bid opening, M&O submitted a letter to the Board clarifying that its all-or- nothing bid was a firm bid for each location and M&O submitted a quotation schedule for each location per dump per container (see page 7 of Joint Exhibit 1 and the last page of Joint Exhibit 2). The charge for each location in this quotation schedule is different than the quotation schedule submitted by M&O at the bid opening and is for the most part lower per location than either M&O's first quotation schedule or the low bids taken from the quotation schedules submitted at the bid opening. Based on the letter and all-or-nothing quotation schedule filed by M&O on June 15, 1988, the Board determined to award the bid for garbage collection services to M&O for the all- or-nothing bid of $3,391.84.
Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law it is RECOMMENDED that The School Board of Bay County enter a Final Order rejecting all bids and readvertising the bid request for garbage collection services as specified in Bid Request No. 89-23. DONE and ENTERED this 13th day of September, 1988, in Tallahassee, Florida. DIANE K. KIESLING Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 13th day of September, 1988. APPENDIX TO THE RECOMMENDED ORDER IN CASE NO. 88-3768BID The following constitutes my specific rulings pursuant to Section 120.59(2), Florida Statutes, on the proposed findings of fact submitted by the parties in this case. Specific Rulings on Proposed Findings of Fact Submitted by Petitioner, Kelly Services: 1. Each of the following proposed findings of fact are adopted in substance as modified in the Recommended Order. The number in parentheses is the Finding of Fact which so adopts the proposed finding of fact: 1-3(1-3); 4-6(3); 7-11(7-11); and 12 (9) Specific Rulings on Proposed Findings of Fact Submitted by Respondent, School Board of Bay County: Each of the following proposed findings of fact are adopted in substance as modified in the Recommended Order. The number in parentheses is the Finding of Fact which so adopts the proposed finding of fact: 1(2); 3(10&11); and 5(8). Proposed findings of fact 6, 7, and 9 are irrelevant. The first sentence of proposed finding of fact 2 is unsupported by the competent, substantial evidence. The remainder of proposed finding of fact 2 is adopted in substance as modified in Finding of Fact 3. Proposed finding of fact 4 is rejected as being unsupported by the competent, substantial evidence. The last sentence of proposed finding of fact 5 is rejected as being argumentative, conclusory and unsupported by the competent, substantial evidence. Proposed finding of fact 8 is unnecessary. Specific Rulings on Proposed Findings of Fact Submitted by Intervenor, Argus Services, Inc.: Each of the following proposed findings of fact are adopted in substance as modified in the Recommended Order. The number in parentheses is the Finding of Fact which so adopts the proposed finding of fact: 2-4(1-3); 6-8(5); 9 & 10(6) 11(3); and 12(11). Proposed findings of fact 1 and 5 are unnecessary. Proposed findings of fact 13-17 are rejected as constituting argument and not findings of fact. COPIES FURNISHED: Jeffrey P. Whitton Attorney at Law Post Office Box 1956 Panama City, Florida 32402 Franklin R. Harrison Attorney at Law 304 Magnolia Avenue Panama City, Florida 32401 Scott W. Clemons Attorney at Law Post Office Box 860 Panama City, Florida 32402 School Board of Bay County Post Office Drawer 820 Panama City, Florida 32402-0820 M&O Sanitation, Inc. 266 N. Star Avenue Panama City, Florida 32404