OLD PORT COVE PROPERTY OWNERS ASSOCIATION vs. DEPARTMENT OF ENVIRONMENTAL REGULATION AND ENVIRONMENTAL REGULATION COMMISSION, 86-003927 (1986)
Division of Administrative Hearings, Florida Number: 86-003927 Latest Update: May 20, 1987

Findings Of Fact Petitioner, the Association, represents 1,053 condominium homeowners located in the Old Port Cove Community, a residential development in Palm Beach County, Florida. Old Port Cove Community consists of seven separate condominium buildings and associations. Many of the individual condominium homes/apartments within the complex border on arid overlook the Old Port Cove area of north Lake Worth which is the location of the two existing marinas operated by the Respondent Applicant and the site of the proposed marina expansion. The water in question is an essential part of the residential community and was, in many cases, a major factor considered by the homeowners purchasing in this community. At the time of development, going back a minimum of seven years, property owners were advised by the developer/Applicant (or its predecessor) that the marinas constructed or to be constructed would be for the exclusive use of the residents of the condominium apartment houses within the complex. On or about March 12, 1986, Respondent DER, received an application from the Applicant for a dredge and fill permit for the construction of a commercial addition to the northernmost marina currently existing at Old Port Cove Complex. The new construction was to consist of 1 pier of a total length of 911 feet with 50 boat slips and 26 finger piers. The new slips will be 45 feet in length of which 15 feet will consist of pier and the remaining 30 feet of open water terminated by a piling. The main pier would extend in a northeast direction from the easternmost point of the existing north pier for a total of 171 feet, then turn northwest for a total of 490 feet, and then turn southwest for an additional 250 feet to enclose an area of water leaving a 90 foot wide space for entry of boats into the enclosed area. The application for the permit contains as an attachment thereto an engineering drawing depicting the proposed marina expansion and its relationship to the existing marina. This expansion was proposed because of the growing need for boat slips in the area. The operator, currently providing a total of 289 slips in both marinas, (197 in the south and 92 in the north) proposes to construct 50 new slips for pleasure boats from 25 to 120 feet in length. Applicant proposes and commits itself to utilize the new slips for sailboats only. Notwithstanding the fact that there are approximately 1,261 additional slips available within a one mile area of the proposed site, the applicant contends it has been continuously turning away applicants for slip rentals in its facilities. If approved, the proposed new facility will constitute an approximate 4 percent increase in the total number of boat slips in the area, not counting the free moorings offshore in the Federal mooring in the center of the cove. Applicant presently operates one diesel fuel pump at the South Marina. No other fueling facilities exist at either marina operated by Applicant nor are any additional fueling facilities intended. Applicant has also entered into a contract with a local fuel spill control company to provide spill cleanup if necessary. At the present time, there are no pump-out stations for sewage at either the North or South Marina. Applicant proposes to install sewage facilities as a part of the approval package. Leasing agreements currently in effect require all boats using the marinas to certify they have U.S. Coast Guard approved heads on board before being allowed to dock at the marina. This requirement is not actively enforced, however. Most boats utilizing the facility are pleasure/non-commercial fishing boats. Individuals, mainly residents of the apartment complex, use the docks for fishing but there is some question as to the nature and availability of the fish population in the area. Manatees do frequent the area, however, not necessarily as far north as the marina in any great numbers, but several hundred yards to the south, congregating at times around the entrance to the intracoastal waterway which forks off to the northwest somewhat south of the south marina. Subsequent to the receipt of the Association's Petition herein, DER had numerous water quality tests performed and requested certain assurances from the Applicant designed to remedy or rectify numerous objections made by the Association in its Petition. Thereafter, on February 16, 1987, DER issued a Revised Intent to Issue in this case in which it addressed the Association's concerns and specified certain conditions to be included in the permit to protect the water quality and biological resources in the project area. These conditions included: A prohibition against commencement of any excavation or other construction activity prior to receipt of evidence of permission from the Trustees of the Internal Improvement Trust Fund or DNR; A requirement for notification of the Division of Archives in the event any historical or archaeological artifacts are discovered within the project site; Provision for permanent sewage pump-out facilities to be provided at the south marina to replace portable facilities currently available, within 90 days of permit issuance, and the provision of temporary sewage pump-out facilities at the north marina which shall be in place and functioning prior to any work being commenced under the permit; The requirement for use of turbidity screens around the project site during construction to remain in place until turbidity behind. The screens falls to an acceptable level; The placing of educational signs, the content of which shall be coordinated with DNR, at both the north and south marinas, informing boaters that manatee may be in the area and requesting that care be taken; The posting of manatee warning signs in both marinas; The establishment of idle speed and no wake zones in both marinas and the access channels; A provision that permanent liveaboards connect their vessels with permanent sewage hook-ups at all times when the vessel is docked; and A provision against refueling facilities at the expanded north marina. Applicant and DER are satisfied that the conditions imposed by the terms of the Revised Intent to Issue satisfy all the current requirements of the statute and rules relevant to dredge and fill permits for projects of this nature. Many of the apartment owners, banding together as the Petitioner Association herein, strongly resist approval of the permit to construct the new marina for numerous reasons. They contend, first, that the construction of the new marina and the greater number of boats resulting therefrom, constitute a threat to the manatee population in the area. The Association is also concerned with water quality in the area, fire safety, wake damage, and noise pollution as a result of the proposal. Other considerations of the residents include parking and a diminishment in the resale value of their property. Several of the residents have seen manatee in the area swimming in the waters adjacent to the marina and in the "key" area on the other side of the peninsula. Many have scars on them and appear to have been injured by collisions with boats. Several residents have seen trash and debris in the water and have observed boats traveling at a high rate of speed just outside the existing marinas. In addition to debris, residents have seen oil and grease floating on the water and contend that the proposed wave baffles hanging down into the water from the extended pier will interfere with the natural flushing action of the winds and tides. Many of these same individuals complain of an extremely bad odor coming from the marina and they have observed boat owners either pumping their bilges directly into the marina water or washing their boats with detergents which are allowed to run overboard into the water. At least one resident, speaking for others as well, referred to a green space, an area of grass outside and between the buildings and the water. Originally, this area was supposed to be gardens and a recreational area for the residential complex, and the yacht club was to be a secondary appurtenance for the property owners. Now, with apartment owners making up no more than 10 percent of the occupants of the marina slips, for it seems as though the apartment residence owners are being shunted to the background and commercial activities, including the marina, are becoming paramount in the eyes of the applicant which still operates it. This green space is now proposed to be converted by the applicant to parking for the use of the marina patrons; all to the detriment of the apartment owners. There is some evidence that boat owners utilize the grounds of the apartment complex as a place to walk their dogs for canine toilet purposes and there is some evidence that numerous liveaboard boat owners, who do not have adequate toilet and bathing facilities on board their boats, utilize the pool, showers, and toilets ordinarily reserved for residents of the apartment complex. Noise from parties on the boats is often both excessive and disturbing and to the knowledge of at least some of those testifying on behalf of the Association, efforts by security personnel employed by the condominium associations to get the boat owners to curb the noise and disruption have been totally unsuccessful. One resident summed up the feelings of his co-owners when he indicated that these various factors translate to property value and because of the current situation with pollution, noise, lack of security, and the increasing commercialism, the result has been a substantial drop in property value. This witness feels that the more slips that are made available, along with their related annoyances, the less the value of the individual apartments will be. All feel that the addition of 50 more slips will increase the existing problems and none of the residents who testified for the association were of the opinion that the developer's controls will be adequate to alleviate or minimize the untenable situation which they now face. However, there was no evidence presented to substantiate the layman opinion of reduction in property value and it cannot be said, therefore, that this has or will really happen, and the amount of loss. Turning to the issue of water quality as effected by refueling operations and sewage disposal at the marina, the question of fueling facilities was not raised by the Association other than to object basically because of the potential for fuel spills. Applicant and DER contend that this problem should be taken care of through the contracting for the services of Glasgow Equipment Service, providing for 24 hour emergency response for fuel spills of any type. It is unreasonable to expect that a marina providing dockage for potentially as many as 289 motor vessels can be expected to be totally spill free. If proper refueling procedures are followed, and there is no evidence to indicate that they would not be, the incidence of fuel spills should be minimal and the contract with the clean-up service providing for around the clock response in case of a spill, appears to be adequate action to remedy the effects of any spill. There have been very few fuel spills in the history of the marina operation. The most recent resulted in a spill of no more than 3 to 5 gallons and clean-up was successfully accomplished with little damage. The Association made much of the fact that no disciplinary action was taken against the offender and that the boat in question is still an occupant of the marina. This incident is still under investigation, however, and final action has not yet been taken. At the current time, there are no pump-out stations for sewage at either the north or south marina. The applicants propose to install a pump-out sewage facility tied to each vessel berth in the south marina and to provide a portable pumpout facility which can be rolled to a particular spot to meet the needs of any vessel at the north marina. The Applicant has agreed to fund the project completely and has agreed to the special conditions contained in the Revised Intent to Issue regarding the pumping stations. Applicant and DER both arranged for testing of the water quality at the north marina to determine the current condition of the water. Dr. John D. Wang, an expert in coastal hydrodynamics on the faculty at the University of Miami, is familiar with the site of the proposed expansion and visited it last in November, 1986. At that time, he did a study on the flow exchange caused by tides and wind over a two day period. As a part of his test, he placed instruments in the water to take measurements of water motion, temperature, and salinity on the outer side of the current pier at the north marina and inside that marina at different depths. On the first day of the test, the tide was an ebb tide (receding) pulling water out of the marina area. However, at the same time, the wind was from the southeast which directly opposed the tide action. At the surface, the drogues (instruments) followed the wind. Those deeper in the water went with the tide. When the tide came in the next day, the drogues went to the north under the power of both wind and tide. Dr. Wang's experiment confirmed not only that the water moved in and out of the marina area, but also that the water circulated clockwise north along the west side of Lake Worth and south on eastern side. Dr. Wang thought this might be due to wind force, but regardless of the cause, it was a good indication that water was exchanged in the area. Dr. Wang concluded that the water in the marina was completely taken out within one hour and joined the circulatory pattern, being replaced by other water. The baffles placed on the piers to reduce wave motion will have some effect on the water circulation tending to reduce surface flow, but these baffles will not prevent the exchange of water due to circulation because they are limited to the top three feet of the water. In Dr. Wang's opinion, they may have some positive effect on circulation by preventing wave water from flowing back out. By the same token, the presence of boats in the marina will have but a marginal effect on water exchange. The draft of the boats utilizing this area is not much more than the wave baffles and there will still be ample water underneath to permit flow and exchange. In fact, in Dr. Wang's opinion, the location of this marina is almost optimal. By virtue of the fact that it is out in the open, water can flow freely through the area and no dredging is required. The flat, sloping bottom promotes water exchange. No evidence was presented to contradict this opinion and it is hereby accepted. Additional tests on water quality were run by Dr. Paul R. McGinnes, head of an independent consultant laboratory specializing in water quality and motion who visited the site several times doing three separate studies of dissolved oxygen, salinity, and water temperature at various depths and at different hours. As a part of his examinations, he also looked for oil (pollutants), and bacterial components. The water subject to tests for bacterial components was taken from the top foot at several locations in each of the three studies. In the 1983 study, tests showed fecal and coliform bacteria were present in sufficient quantities to constitute a few violations. In 1986, when he sampled for fecal bacteria only, the count was very low. In the 1987 test of samples taken twenty times over 24 hours, the fecal bacteria count was, in each case, within state limits. As to heavy metals, in 1983, levels of lead, cadmium, mercury, and zinc were not present. There was no evidence as to current levels. As to oils and greases, all studies showed very little present (below 5mg per litre) and what grease was there could consist of animal or vegetable fats. This is considered unlikely and it is found there is petroleum product in the water, though in insignificant quantities. Regarding dissolved oxygen, all tests showed compliance with state standards. Levels were comparable to other areas of Lake Worth. Dr. McGinnes is generally familiar with the state standards for Class III waters and believes the construction and operation of the new 50 slips at the north marina will in no way result in violation of state water quality standards. His opinion as to this construction is based on his tests, his conversations with applicant's personnel, and his experience with other similar projects. Granted, boats do tend to leak oil and that situation will raise the oil level in the immediate area of the leak. However, not all boats leak in all marinas and what leaks there are will tend to dissipate to a safe level within a very short period of time. In February, 1983, the coliform bacteria in the south marina were higher than in the north marina or in Lake forth in general. However, coliform bacteria does not appear to be a major problem in this case. In response to cross examination, Dr. McGinnes concluded that even if five boats dumped raw sewage in the north marina, it would not have any major negative impact on the overall water quality there. It would, of course, affect the sample taken in the area immediately after dumping, but not the overall quality over the long run. Dr. McGinnes' last sample was taken in February, 1987, which is a time of highest use. The water quality in and around the marina is generally as good as in the northern end of Lake Worth which is better than in the southern end of the lake. His examination of the water quality indicated no recognized violations of Florida water quality standards in the last two reports. The association's expert, Mr. Timmer, went to Old Port Cove in January, 1987 and saw numerous boats in the slips. He looked for inlets opening into the marine and for a bird population, either one of which could cause an increase in undesirable bacteria in the area. He found none. He took water samples for testing to see if the fecal coliform bacteria level in the marina was higher than outside it. During his tests, he took samples from 14 sites at three separate depths at each. His samples were duplicated for safety in case any one sample was compromised. Six of his samples were taken inside the dock area of the north marina; one was taken to the north several thousand yards; and four more were taken outside the area of the proposed marina. One was taken in the federal anchorage; several across the cove on the east side of the lake and one outside the cove, south of the Intracoastal Waterway inlet and west of the channel. The furthest test site was approximately one mile from the marina. When Mr. Timmer got his samples, he isolated the sets from each other; "refrigerated" them (placing them in a cooler without any ice), and upon completion of his sampling, took them to the McGinnes lab where analyses were done for fecal coliform bacteria. As a result of his tests, and relying on the report received from McGinnes Laboratories, Mr. Timmer concluded that the fecal coliform level within the marina was higher than outside the marina by 5 to 10 times. Surface samples, he felt, averaged out in excess of what he considered to be the state standard. Some of the lower level samples were high also. In no case, however, did any sample exceed a count of 15 outside the marina. Coliform standards, according to state rules, are to be averaged over a month's period of taking. In fact, the report received from the McGinnes lab concluded that because testing was not done over a month's period, the standard was not exceeded. These samples, even that one reflecting a reading of 560 bacteria per 100 ml at site 3a, did not come anywhere near the upper limits of the state standard and in fact was well within it. Mr. Churchill, a zoologist and ecologist and expert in marine biology made various studies of the benthic communities and fish population in the area of the proposed construction. He studied the soft bottom communities and took samples of the bottom in different areas both inside and outside the current marina and in the area where the extension is proposed. He found that the outside and the outer inside communities were much the same and had a low number of species. The inner inside was considerably different. It had a higher number of both species and individuals. A larger number is a better system and DER rules provide that one cannot build a project which would tend to reduce the number. Here, since the area where the construction is planned is outside the area of high species count and similar to the rest of the cove area, the construction would most likely not violate the state's rule. In fact, in Mr. Churchill's opinion, concurred in by other experts, the proposed project will, rather than negatively impact the environment for wildlife, enhance it by providing additional habitat. The pilings, forming supports for the piers and ties for the boats will provided habitat for small marine life which in turn provide food for larger life which is attracted. This testimony would tend to contradict the testimony of at least one of the residents who indicated that in his experience, the fish population in the area had declined radically over the years since he moved in and that about all one can catch in the immediate area now are some small sheepshead. This is in comparison to the larger variety and size of fish available to the angler several years in the past. No doubt, the fish selection and availability has diminished since the area was developed, but the question is whether the new construction will aggravate that situation and the answer appears to be that it will not. An additional water quality study was conducted by Dr. Martin Roessler, a marine scientist who did a water quality study in the area consistent with that done by Dr. McGinnes. He also did several of his own on- site inspections as to water clarity and marine plant and other life including reptiles and birds in the area. On his third visit to the site, he took water quality samples for testing for bacteria and other marine life. As a result of his tests, he concluded that water quality in the area should not be diminished by construction of the marina. During construction, the use of turbidity curtains and booms will tend to keep any temporary disruption to a minimum. He agrees with Dr. McGinnes and Mr. Churchill that the nature of marine life within the area should not be disturbed by the construction. He was unable to observe any sea grasses in the area (they are on the other side of the cove and not where he observed) and dredging would not be involved; only the driving of pilings which will disrupt the bottom only in the immediate area of the piling. Dr. Roessler's credibility was not damaged by the Association's evidence that a previous study done for another agency was rejected and he was not paid for the work done. There was insufficient evidence of detail and a broad-brush smear can not be held effective here. When Old Port Cove submitted it's application for its permit, it included the original draft and all requested information in a final product. This project documentation was evaluated by Ms. Janet Llewellyn, a supervisor with DER, who is an individual fully conversant and familiar with the dredge and fill rules and standards set forth in the statutes and the F.A.C. As to water quality, Ms. Llewellyn analyzed the information submitted by the applicant in response to her request for water samples at certain locations she had identified. These samples showed no current violation of the rules governing dissolved oxygen and fecal or coliform bacteria even with the boats that are currently in the marina. DER also requested "hydrographic information as a part of the reasonable assurance" test and this information was to deal with existing water quality and the flushing action of the tides and winds. Ms. Llewellyn has visited the site, albeit only shortly before the hearing, and as a result believes that the drawings submitted with the permit application are correct and represent the work to be done accurately. Recognizing that the field inspection report submitted by on-scene local DER personnel is somewhat negative in its evaluation of the project, she nonetheless disagrees with certain portions of this report which say that boats and piers will interfere with the flushing action of the wind and tide. She also disagrees with the statement that oil and grease will continue to degrade water quality. She feels that the inspector who did the report did not have available to him the hydrographic and water quality tests that she had. This information, submitted somewhat earlier, was sent to Tallahassee by the experts and was not forwarded to the field representative when the request for the survey was laid on. The Revised Intent to Issue, including as it does, the additional requirements laid on the applicant in such areas as sewage pump-out, liveaboards, fueling facility prohibitions, and the like came about as a result of misunderstandings between DER and the applicant and culminated in the applicant agreeing to try to ameliorate the situation and the issuance of the permit by compromise as suggested. DER is satisfied with the proposals contained in the Revised Intent to Issue and feels that approval of this permit will upgrade the facilities at the south marina as well as insure compliance with state water quality standards at the north marina. Together it will result in an upgrade in the water quality in the area. Ms. Llewellyn is convinced that there will be no negative effects on the water quality by the construction at the north marina and that the criteria contained in both the statutes and the rules, from an environmental standpoint, will not be violated. DER has no authority to consider other factors which appear to be among the most substantial complaints of the association members. She did not consider the possibility of damage to the scenic view by the addition because she did not consider it to be an issue. In her opinion, the question of damage to the property of others relates to damage to structure, property, wildlife, etc., and the impacts to these would be negligible. What she considers important is that the permit involved here is for construction, not operation of the marina and enforcement of continuing operational rules is another consideration entirely. When using the term "assurance" as a requirement for an applicant, the assurance required is not that the new slips will have no adverse impact, but that any adverse impact will not reduce the water quality below standards set out in the statutes and rules. Though not envisioned, water quality can be reduced from very high quality to high quality (a reduction in quality) and still be within standards. Additional scientific examination of the water and the immediate site was conducted by Dr. Kenneth L. Echternacht, a hydrographic engineer, physicist, and physical water quality expert with DER who reviewed the hydrographic study submitted with the application. He found that the drogue study showed water speeds of between .05 to .1 feet per second which was typical of the area. The placing of drogues and the resultant study and conclusions was not flawed by the lack of education of the individual who did the placing at the direction of the scientist. What is important is the education and knowledge of the supervising scientist who will take the information gathered and examine it. Considering that prevailing winds in this area during daylight hours are from the sea to the land, (SE to M), and at night the reverse occurs, any study made only during daylight or during nighttime would be flawed to the extent that it would examine only one part of the equation. Given the baseline information available to him, Dr. Echternacht concluded the project as described would not adversely effect water quality from a hydrographic standpoint. Flushing and circulation are important to water quality. If the water does not move, the pollutants added by outside factors, (here boats), accumulate and build up. On the other hand, the faster the water moves, mixed with turbulence, the faster the pollutant is disbursed and prevented from accumulating. At .05 f/sec, a particle of water would move 180 feet per hour. As a result, water will move the length of the marina, (450') in 2 1/2 hours. Therefore, if a spill occurred at the south boundary during an incoming tide, it would move to the north boundary of the marina within 2 1/2 hours and given a tide cycle of 6 1/2 hours, would still have 3 1/2 to 4 hours to move even further away, mix with other water, and be disbursed before being brought back to the marina by the outgoing tide. (However, there is evidence that the water moves in a clockwise direction and the likelihood is great that the contaminated water would not even come back to the marina but would head out down the eastern side of the cove.) This is a worst case situation because of the slow water movement rate utilized and it is, itself, a relatively fast movement. Admittedly, this water movement will be affected by obstacles in the water such as boat hulls, posts, pilings, and baffles. However, while these factors would slow up the water, they would also create turbulence and vortices in the water which, themselves, help mixing. From a practical standpoint, other factors are involved such as the size of the obstacle, etc. Here we are faced with a situation where the marina is not enclosed and the water flows freely. The water quality can be expected to be better than in an enclosed marina and even better in the new area than in the existing areas because it will be further away from the seawall. Taken together, in light of the evidence presented by both sides, it is found that a diminishment in water quality as a result of the construction of the proposed facility here would be minimal and would in no case, likely result in a reduction of the water quality to a level below that considered acceptable in the state statutes and rules. In addition to water quality, the residents were concerned about the threat of injury to the manatee population which, while not appearing in the immediate area of the proposed construction on a regular basis, does visit the area periodically. In addition, there is substantial evidence to establish that boats coming into and out of the marina, going down through the channel into the main part of Lake Worth and out through the cut, would pass through areas actively populated and visited by manatees and therefore, the opening of 50 additional slips for new boats, even in this less populated area, could have a substantial impact on the manatee population. There is no doubt that manatees do visit the area. There are sea grasses, if not in the immediate area of the proposed marina, certainly on the opposite shore of the north part of Lake Worth. It is uncontroverted as well that manatees have been seen near the marina and in the key area on the other side of the peninsula. However, the evidence introduced by the association's own witnesses, Mr. Rose and Dr. Odell, indicates that the manatee population tends to congregate in areas south of the entrance to the Intracoastal Waterway which, itself, is south of the Old Port Cove area. Many manatee congregate in the warm waters produced by the Riviera Beach power plant in the southern part of Lake Worth and go from there to other areas within the Lake Worth area to feed, even as far north as Hobe Sound and Loxahatchee. Generally, there are not enough sea grasses in the local area to keep them there. Manatees can range up to 12 feet in length and up to 3500 pounds in weight. Manatee deaths in Palm Beach County, of which boat deaths account for approximately 50 percent, are a serious danger to the survival of the manatee population. The greatest danger to manatees comes from power boats. While there is no evidence that sailboats are dangerous since they move slowly enough for the manatee normally to evade then, there nonetheless may be some danger as a result of their presence. Some manatees are crushed by barges and larger power boats. Some are killed by impact with medium and larger boats. In approximately 40 percent of the cases, impact kills without propeller injuries and it is hard to tell the size of the boat which did the damage. As to propeller deaths, boats from 24 feet up can kill by this method. The number of manatee deaths has increased lately as a result of boat and other man related causes and if this trend continues, the manatee population will decline and, possibly, become extinct. Mr. Rose, who is quite familiar with the habits of the manatee in this area, states that it is most likely that in traveling north to Hobe Sound and environs, the manatee would travel up the Intracoastal Waterway (the entrance to which is south of the proposed construction) and not go into the Old Port Cove area. Even if they were following the grass which runs along the east and north shores of Old Port Cove, the grass does not grow on the marina side and it is unlikely the manatees would come to the marina in the west to feed though they might come for other reasons and in fact have been seen in the "key" area. Dr. Odell, perhaps the foremost authority on manatees in the United States, has visited the area and, at this hearing, heard the testimony of the other witnesses. He contends that because of the food available in the form of sea grasses and mangrove seeds, primarily on the eastern side of the cove, the likelihood is that manatees would be found in that area. This is consistent with the testimony of Mr. Rose. Consequently, it is found that while manatees come to the area of the proposed marina from time to time, it is more the stray manatee than evidence of continued habitat. Dr. Odell's studies indicate that between 1974 and 1985, there were no manatee deaths recorded in north Lake Worth. However, it is possible that the dead manatee found elsewhere may have been injured or even died elsewhere, (possibly near Old Port Cove) and there well may have been others who were injured in the area who went elsewhere to die. There is, however, no evidence that this is the case. Dr. Odell considers that boats with a draft of between 5 and 7 feet would leave little clearance from the bottom in the bottleneck area south of the marina where the water depth is no more than 9 or 10 feet, to allow room for the manatee to avoid them. In fact, he feels that large, inboard powered boats pose the greatest threat to the manatee. While sailboats generally do not create a risk to the mammal, if the new 50 slips were to be limited to sailboats but all existing slips were to be converted to power boats, this would constitute a severe threat to the manatee population. Further, a change in use patterns, creating more traffic, would increase the risk to the manatee. The real issue is, however, how much time boats spend in manatee habitats. The more boats there are, the less desirable the situation. (Both experts agree, however that if the 50 new slips are limited to sailboats and the ratio of power boats to sailboats in the existing slips is not increased, there is really no legitimate reason, based on a threat to the manatee population, to deny this construction permit.) It would appear, then, that the risk to the manatee population is acceptable. Signs advising boaters to slow down and beware of manatee are good only so long as they promote awareness. There is, according to Dr. Odell, no evidence that they have reduced manatee mortality and given present trends of more power boats and the destruction of the manatee's habitat, one can expect the manatee population to decrease even further.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is therefore: RECOMMENDED that the Department of Environmental Regulation issue a dredge and fill permit to the applicant to construct an additional 50 slips at its north marina as proposed. RECOMMENDED this 20th day of May, 1987, at Tallahassee, Florida. ARNOLD H. POLLOCK Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 20th day of May, 1987. APPENDIX TO RECOMMENDED ORDER The following constitutes my specific rulings pursuant to Section 120.57(2), Florida Statutes, on all of the proposed Findings of Fact submitted by the parties to this case. By Petitioner, Old Port Cove Property Owners Association: 1. Accepted except that the undersigned would quell at the right of an individual who wore 44 foot "boots." 2-7. Accepted. 8. Accepted except for the Finding that sea grasses grow as close as 50 feet to the north marina. 9-10. Accepted. The north marina contains 92 slips which includes 66. Other findings contained herein are accepted. Accepted. Accepted but more in the nature of argument than fact and qualified by the fact that new liveaboards must agree to connect to the proposed central sewage system. Accepted. Rejected as argument rather than Finding of Fact. Rejected as contrary to the weight of the evidence. 17-20. Accepted. 21. Rejected as contrary to the weight of the evidence as relates to the first sentence. Accepted as to the cited contents of the survey. 22-23. Accepted. 24. Rejected as not supported by the evidence. 25-26. Accepted. 27-37. Accepted. 38. Immaterial. By Respondent, Old Port Cove Properties, Limited: 1-7. Accepted. 8-11. Accepted. 12-19. Accepted. 16-19. Accepted as recitations of testimony presented. Rejected as to a shortage of marina slips, accepted as to the rest. Accepted. Accepted as argument. By Respondent, Department of Environmental Regulation: 23-25. Accepted. COPIES FURNISHED: Dale Twachtmann, Secretary Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Daniel S. Rosenbaum, Esquire Suite 720 450 Australian Avenue South West Palm Beach, Florida 33409 Douglas Wyckoff, Esquire Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Robert A. Routa, Esquire Post Office Box 1386 213 South Adams Street Tallahassee, Florida 32302 =================================================================

Florida Laws (5) 120.52120.57120.60120.68403.031
# 1
GARY JENSEN vs CITY OF DELTONA AND ST. JOHNS RIVER WATER MANAGEMENT DISTRICT, 04-002405 (2004)
Division of Administrative Hearings, Florida Filed:Deltona, Florida Jul. 12, 2004 Number: 04-002405 Latest Update: Feb. 14, 2006

The Issue The issue is whether the applicant for an Environmental Resource Permit ("ERP"), the City of Deltona ("City" or "Applicant"), has provided reasonable assurance that the system proposed complies with the water quantity, environmental, and water quality criteria of the St. Johns River Water Management District's ("District") ERP regulations set forth in Florida Administrative Code Chapter 40C-4, and the Applicant's Handbook: Management and Storage of Surface Waters (2005).

Findings Of Fact The District is a special taxing district created by Chapter 373, Florida Statutes, charged with the duty to prevent harm to the water resources of the District, and to administer and enforce Chapter 373, Florida Statutes, and the rules promulgated thereunder. The City of Deltona is a municipal government established under the provisions of Chapter 165, Florida Statutes. The Lake Theresa Basin is comprised primarily of a system of interconnected lakes extending from Lake Macy in the City of Lake Helen to the Butler Chain of Lakes (Lake Butler and Lake Doyle). The Lake Theresa Basin is land-locked and does not have a natural outfall to Lake Monroe and the St. Johns River. In 2003, after an extended period of above-normal rainfall in the Deltona area, the lakes within the land-locked Lake Theresa Basin staged to extremely high elevations that resulted in standing water in residential yards, and rendered some septic systems inoperable. Lake levels within the Lake Theresa Basin continued to rise and were in danger of rising above the finished floor elevations of some residences within the basin. On March 25, 2003, the District issued an Emergency Order (F.O.R. No. 2003-38) authorizing the construction and short-term operation of the Lake Doyle and Lake Bethel Emergency Overflow Interconnection. Since wetland and surface water impacts would occur, the Emergency Order required the City of Deltona to obtain an ERP for the system. The project area is 4.1 acres, and the system consists of a variable water structure on the west shore of Lake Doyle connected to a series of pipes, swales, water control structures, and wetland systems which outfall to a finger canal of Lake Bethel, with ultimate discharge to Lake Monroe and the St. Johns River. The first segment of the system extends downstream from the weir structure on the west shore of Lake Doyle via a pipe entrenched in the upland berm of the Sheryl Drive right-of-way. The pipe passes under Doyle Road and through xeric pine-oak uplands to the northeast shore of a large (approximately 15 acres) deepwater marsh. Water flows south through the deepwater marsh where it outfalls through four pipes at Ledford Drive. Two of the four pipes are overflow structures, controlled by canal gates. The pipes at Ledford Drive discharge into a ditch and into a large (greater than 20 acres) shallow bay swamp. The south end of the bay swamp is defined (and somewhat impounded) by a 19th Century railroad grade. Water flows through the bay swamp where it outfalls through five pipes at the railroad grade. Three of the five pipes are overflow structures, controlled by channel boards. The pipes at the railroad grade discharge to a 1500-foot long finger canal that was dug some time during the period 1940-1972 from the north central shore of Lake Bethel. The overflow interconnection system has three locations whereby the system can be shut down: 1) Lake Doyle--a control weir, controlled by three sluice gates; 2) Ledford Drive--two thirty-inch reinforced concrete pipes, controlled by canal gates; and 3) railroad grade--three thirty-inch reinforced concrete pipes, controlled by channel boards (collectively referred to as "Overflow Structures"). The Overflow Structures are designed to carry the discharge of water from Lake Doyle to Lake Bethel. With the Overflow Structures closed the system returns to pre-construction characteristics, meaning there will be no increase or decrease in the quantity or quality of water throughout the path of the system as a result of the project. An unequivocal condition of the permit is that the system would operate with all of the Overflow Structures closed. As an added assurance, the City proposes to place a brick and mortar plug in the Lake Doyle weir structure outfall pipe to prevent any discharge from the weir. The City has submitted to the District preliminary plans for a future phase in which the system would be modified for the purpose of alleviating high water levels within the Lake Theresa Basin when the water level in Lake Doyle rises above an elevation of 24.5 feet. The District shall require a separate permit application to be submitted for such future plans. Petitioner, Barbara Ash, has lived on Lake Theresa for 19 years. Ms. Ash lives upstream from the area of the weir that will be plugged in accordance with the ERP. She does not trust either the City of Deltona to comply with or the District to enforce the conditions of the ERP applied for by the City. Petitioner, Barbara Ash, also served as the qualified representative for Petitioners, Francell Frei, Bernard J. and Virginia Patterson, and Ted and Carol Sullivan. Ms. Ash represented that Ms. Frei has lived on Lake Theresa for 12 years, and both the Pattersons and the Sullivans live on Lake Louise, which is within the area of concern in this proceeding. Petitioner, Diana Bauer, has lived on Lake Theresa since February 2004. She fears that the lake will become too dry if the system is allowed to flow. She also believes the wildlife will be adversely affected if the water levels are too low since many species need a swampy or wet environment to thrive. She fears her property value will decrease as a result of the approval of the ERP. She also does not trust either the City to comply with or the District to enforce the conditions of the ERP. Petitioner, Howard Ehmer, lives two to three hundred yards down Lake Theresa from Ms. Bauer. He is concerned about the lake bed being too dry and attracting people on all terrain vehicles who enjoy driving around the lake bottom. He is concerned about his property value decreasing if the lake bed is dry. Further, when the lake level is too low, people cannot enjoy water skiing, boating, and fishing on Lake Theresa. Petitioner, Phillip Lott, a Florida native, has also owned and lived on property abutting Lake Theresa since 1995. Mr. Lott has a Ph.D. in plant ecology, and M.P.A. in coastal zone studies, an M.B.A. in international business, and a B.S. in environmental resource management and planning. Mr. Lott has been well acquainted with the water levels on Lake Theresa for many years. Based upon his personal observations of the lake systems in the Deltona area over the years, Mr. Lott has seen levels fluctuate greatly based upon periods of heavy and light rainfall. Mr. Lott is concerned that the District will permit the City to open the weir to let water flow through the system and cause flooding in some areas and low water levels in other areas. He fears that the District will allow the water to flow and upset the environmental balance, but he admits that this ERP application is for a closed system that will not allow the water to flow as he fears. Mr. Lott similarly does not trust the City to comply with and the District to enforce the conditions of the ERP. Petitioners, James E. and Alicia M. Peake, who were represented by Steven L. Spratt at hearing as their qualified representative, live on Lake Louise, which is interconnected with the Lake Theresa basin. The Peakes are concerned that if the level of Lake Louise drops below 21 feet, nine inches, they will not be able to use the boat launch ramps on the lake. Petitioner, Steven L. Spratt, also lives on Lake Louise, and is concerned about the water levels becoming so low that he cannot use the boat launch on the lake. He has lived on the lake since 2000, and remembers when the water level was extremely low. He fears that approval of the ERP in this case will result in low levels of water once again. Petitioner, Gloria Benoit, has live on Lake Theresa for two years. She also enjoys watching recreational activities on the lake, and feels that approval of the ERP will devalue her lakefront property. Ms. Benoit appeared at the first day of the hearing, but offered no testimony on her behalf. J. Christy Wilson, Esquire, appeared prior to the final hearing as counsel of record for Petitioners, Steven E. Larimer, Kathleen Larimer, and Helen Rose Farrow. Neither Ms. Wilson nor any of the three Petitioners she represented appeared at any time during the hearing, filed any pleadings seeking to excuse themselves from appearing at the final hearing, or offered any evidence, testimony, pre- or post- hearing submittals. Petitioner, Gary Jensen, did not appear at hearing, did not file any pleadings or papers seeking to be excused from appearing at the final hearing, and did not offer any evidence, testimony, pre- or post-hearing submittals. Both the City and the District recognize that areas downstream from the project site, such as Stone Island and Sanford, have experienced flooding in the past in time of high amounts of rainfall. The system proposed by the City for this ERP will operate with the overflow structures closed and a brick and mortar plug in the outfall pipe to prevent water flow from Lake Doyle to Lake Bethel. So long as the overflow structures are closed, the system will mimic pre-construction flow patterns, with no increase in volume flowing downstream. The District has considered the environment in its proposed approval of the ERP. The area abutting the project is little urbanized and provides good aquatic and emergent marsh habitat. With the exception of the western shore area of the deepwater marsh ("west marsh area"), the bay swamp and remaining deepwater marsh area have good ecological value. In the 1940's, the west marsh area was incorporated into the drainage system of a poultry farm that occupied the site. This area apparently suffered increased nutrient influxes and sedimentation that contributed to a proliferation of floating mats of aquatic plants and organic debris. These tussocks reduced the deepwater marsh's open water and diminished the historical marsh habitat. Water under the tussocks is typically anoxic owing to total shading by tussocks and reduced water circulation. Thick, soft, anaerobic muck has accumulated under the matted vegetation. Exotic shrubs (primrose willow Ludwigia peruvania) and other plants (cattails Typha spp.) dominate the tussocks. The construction of the project, from the 2003 Emergency Order, resulted in adverse impacts to 1.3 acres of wetlands having moderately high- to high ecological value and 0.2 acres of other surface waters. The 0.2 acre impact to other surface waters was to the lake bottom and the shoreline of Lake Doyle where the weir structure was installed. The 0.3 acres of wetland impacts occurred at the upper end of the deepwater marsh where the pipe was installed. The largest wetland impact (1.0 acre) was to the bay swamp. The bay swamp is a shallow body dominated by low hummocks and pools connected inefficiently by shallow braided channels and one acre is filled with a 1-2 foot layer of sediment following swamp channelization. Disturbance plants (e.g., primrose willow, Ludwigia peruvania, and elderberry Sambucus Canadensis) now colonize the sediment plume. Pursuant to the District's elimination and reduction criteria, the applicant must implement practicable design modifications, which would reduce or eliminate adverse impacts to wetlands and other surface waters. A proposed modification, which is not technically capable of being done, is not economically viable, or which adversely affects public safety through endangerment of lives or property is not considered "practicable." The City reduced and/or eliminated the impacts to the lake bottom and shoreline of Lake Doyle and deepwater marsh, to the extent practicable. The impacts were the minimum necessary to install the weir structure and pipe for the system; the weir structure and pipe were carefully installed on the edges of the wetland and surface water systems, resulting in a minimum amount of grading and disturbance. To compensate for the loss of 1.3 acres of wetlands and 0.2 acres of other surface waters, the City proposes to preserve a total of 27.5 acres of wetlands, bay swamp, marsh, and contiguous uplands. Included in this 27.5 acres are 6.4 acres of the west marsh, which are to be restored. The parties stipulated that the mitigation plan would adequately compensate for losses of ecological function (e.g. wildlife habitat and biodiversity, etc.) resulting from the project. Water quality is a concern for the District. Lake Monroe is included on the Florida Department of Environmental Protection's verified list of impaired water bodies for nitrogen, phosphorous, and dissolved oxygen. Water quality data for Lake Monroe indicate the lake has experienced high levels of nitrogen and phosphorous and low levels of dissolved oxygen. Prior to construction of the project, there was no natural outfall from the Lake Theresa Basin to Lake Monroe and therefore no contribution from this basin to nitrogen and phosphorous loadings to Lake Monroe. Lake Colby, Three Island Lakes (a/k/a Lake Sixma), and the Savannah are surface waters within the Lake Theresa Basin for which minimum levels have been adopted pursuant to Florida Administrative Code Chapter 40C-8. The system will operate with the overflow structures closed and a brick and mortar plug in the outfall pipe to prevent water flow from Lake Doyle to Lake Bethel, resulting in no outfall from the Theresa Basin to Lake Monroe. Minimum flows established for surface waters within the Lake Theresa Basin will not be adversely impacted. Under the first part of the secondary impact test, the City must provide reasonable assurance that the secondary impacts from construction, alteration, and intended or reasonable expected use of the project will not adversely affect the functions of adjacent wetlands or surface waters. The system is designed as a low intensity project. As proposed, little activity and maintenance are expected in the project site area. The reasonably expected use of the system will not cause adverse impacts to the functions of the wetlands and other surface waters. None of the wetland areas adjacent to uplands are used by listed species for nesting or denning. In its pre-construction state, the project area did not cause or contribute to state water quality violations. Under the second part of the secondary impact test, the City must provide reasonable assurance that the construction, alteration, and intended or reasonably expected uses of the system will not adversely affect the ecological value of the uplands to aquatic or wetland dependent species for enabling existing nesting or denning by these species. There are no listed threatened or endangered species within the project site area. Under the third part of the secondary impact test, and as part of the public interest test, the District must consider any other relevant activities that are closely linked and causally related to any proposed dredging or filling which will cause impacts to significant historical and archaeological resources. When making this determination, the District is required, by rule, to consult with the Division of Historical Resources. The Division of Historical Resources indicated that no historical or archaeological resources are likely present on the site. No impacts to significant historical and archaeological resources are expected. Under the fourth part of the secondary impact test, the City must demonstrate that certain additional activities and future phases of a project will not result in adverse impacts to the functions of wetlands or water quality violations. The City has submitted to the District preliminary plans for a future phase in which the system would be modified for the purpose of alleviating high water levels within the Lake Theresa Basin when the level in Lake Doyle rises above an elevation of 24.5 feet. Based upon the plans and calculations submitted, the proposed future phase, without additional measures, could result in minor increases in the loadings of nitrogen and phosphorous to Lake Monroe. Lake Monroe is included on the Florida Department of Environmental Protection's verified list of impaired water bodies due to water quality data indicating the lake has experienced high levels of nitrogen and phosphorous, and low levels of dissolved oxygen. Under this potential future phase, there would be an outfall from the Lake Theresa Basin to Lake Monroe. To address the impact on water quality of this potential future phase, the City has submitted a loading reduction plan for nitrogen, phosphorous, and dissolved oxygen. The plan includes compensating treatment to fully offset the potential increased nutrient loadings to Lake Monroe. Specifically, the loading reduction plan includes: Construction and operation of compensating treatment systems to fully offset anticipated increased nutrient loadings to Lake Monroe. Weekly water quality monitoring of the discharge from Lake Doyle for total phosphorous and total nitrogen. A requirement that the overflow structure be closed if the total phosphorous level reaches 0.18 mg/l or higher or the total nitrogen level reaches 1.2 mg/l or higher in any given week and will remain closed until levels fall below those limits. The implementation of these water quality mitigation measures will result in a net improvement of the water quality in Lake Monroe for nitrogen, phosphorous, or dissolved oxygen. The future phase was conceptually evaluated by the District for impacts to wetland functions. The future phase as proposed could result in adverse impacts to wetland functions. Operation of the system with the overflow structures open could impact the bay swamp and deepwater marsh. The City has demonstrated that any adverse impacts could be offset through mitigation. Based upon the information provided by the City and general engineering principles, the system is capable of functioning as proposed. The City of Deltona will be responsible for the operation, maintenance, and repair of the surface waster management system. A local government is an acceptable operation and maintenance entity under District rules. The public interest test has seven criteria. The public interest test requires the District to evaluate only those parts of the project actually located in, on, or over surface waters or wetlands, to determine whether a factor is positive, neutral, or negative, and then to balance these factors against each other. The seven factors are as follows: the public health, safety, or welfare of others; conservation of fish and wildlife and their habitats; fishing, recreational value, and marine productivity; temporary or permanent nature; 5) navigation, water flow, erosion, and shoaling; 6) the current condition and relative value of functions; and 7) historical and archaeological resources. There are no identified environmental hazards or improvements to public health and safety. The District does not consider impacts to property values. To offset any adverse impacts to fish and wildlife and their habitats, the City has proposed mitigation. The areas of the project in, on, or over wetlands do not provide recreational opportunities. Construction and operation of the project located in, on, or over wetlands will be permanent in nature. Construction and operation of the project located in, on, or over wetlands will not cause shoaling, and does not provide navigational opportunities. The mitigation will offset the relative value of functions performed by areas affected by the proposed project. No historical or archaeological resources are likely on the site of the project. The mitigation of the project is located within the same drainage basin as the project and offsets the adverse impacts. The project is not expected to cause unacceptable cumulative impacts.

Recommendation Based upon the Findings of Fact and Conclusions of Law, it is RECOMMENDED that a Final Order be entered granting the City of Deltona's application for an environmental resource permit with the conditions set forth in the Technical Staff Report, and dismissing the Petitions for Formal Administrative Hearing filed by Gary Jensen in Case No. 04-2405, and by Steven E. Larimer, Kathleen Larimer, and Helen Rose Farrow in Case No. 04-3048. DONE AND ENTERED this 27th day of May, 2005, in Tallahassee, Leon County, Florida. S ROBERT S. COHEN Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 27th day of May, 2005. COPIES FURNISHED: George Trovato, Esquire City of Deltona 2345 Providence Boulevard Deltona, Florida 32725 Diana E. Bauer 1324 Tartan Avenue Deltona, Florida 32738 Barbara Ash, Qualified Representative 943 South Dean Circle Deltona, Florida 32738-6801 Phillip Lott 948 North Watt Circle Deltona, Florida Howard Ehmer Nina Ehmer 32738-7919 1081 Anza Court Deltona, Florida 32738 Francell Frei 1080 Peak Circle Deltona, Florida 32738 Bernard T. Patterson Virginia T. Patterson 2518 Sheffield Drive Deltona, Florida 32738 Kealey A. West, Esquire St. Johns River Water Management District 4049 Reid Street Palatka, Florida 32177 J. Christy Wilson, Esquire Wilson, Garber & Small, P.A. 437 North Magnolia Avenue Orlando, Florida 32801 Gloria Benoit 1300 Tartan Avenue Deltona, Florida 32738 Gary Jensen 1298 Tartan Avenue Deltona, Florida 32738 James E. Peake Alicia M. Peake 2442 Weatherford Drive Deltona, Florida 32738 Steven L. Spratt 2492 Weatherford Drive Deltona, Florida 32738 Ted Sullivan 1489 Timbercrest Drive Deltona, Florida 32738 Kirby Green, Executive Director St. Johns River Water Management District 4049 Reid Street Palatka, Florida 32177

Florida Laws (3) 120.569120.57373.086 Florida Administrative Code (6) 40C-4.30140C-4.30240C-4.33140C-4.75162-302.30062-4.242
# 2
SACARMA BAY AND CUDJOE OCEAN SHORES HOMEOWNERS vs. DEBRA FLYNN & DER, 84-002384 (1984)
Division of Administrative Hearings, Florida Number: 84-002384 Latest Update: May 01, 1985

Findings Of Fact The Respondent Debra Flynn has submitted an application to the DER to construct a dock extending 190 feet waterward of the mean high water line of waters of the state, which would also extend 80 feet landward of the mean high water line through a transitional wetland area. The landward extent of the dock will completely span the DER's wetland jurisdiction at the project site. A raised "pad" of fill upon which the applicant's house would be constructed and a filled driveway, although originally a part of this application, has been altered in design by the applicant such that those two items have been removed from the geographical extent of the DER's jurisdiction and those two items in the proposed project are no longer at issue. The applicant's lot is approximately 300 feet deep by 100 feet wide. This lot is one of many similarly sized lots which border Niles Channel on the east and Nyles Road on the west, on Summerland Key. These lots vary in nature from tidally inundated mangrove wetlands to a combination of upland and transitional wetlands fringed by mangroves along the water's edge. The portion of the applicant's lot nearest to Nyles Road is primarily characterized by upland vegetation extending approximately 75 to 100 feet in an easterly direction from the road. The elevation gradually decreases toward the waterfront of the lot on Niles Channel, with buttonwood (Conocarpus erecta), dropseed (Sporobolus sp.), key grass (Monanthochloe littoralis), and sea daisy (Borrichia sp.) being the dominant species over most of the applicant's lot. Over the northern side of the property adjacent to adjoining lot 34, a pocket of black mangroves (Avicennia germinans) extends inland, nearly to the upland area described above. As the lot elevation drops toward the shoreline, mangrove growth occurs more frequently, culminating in a dense mangrove fringe bordering Niles Channel. This mangrove fringe becomes well established some 30 feet landward of the approximate mean high water line, being dominated by black and white mangroves. Waterward of the mean high water line, red mangroves dominate for a distance of approximately 30 feet out into Niles Channel. The landward portion of the dock would have only minimal environmental impacts on the transitional wetlands as established by DER's expert witness Meyer and witness Kephart. No contradictory evidence was submitted in this regard. The bottom of Niles Channel extending 65 feet waterward of the mangrove fringe area is characterized by a hard caprock substrate covered with somewhat coarse sediments and loose algaes. In addition to the loose algae, the bottom, attached marine life communities are characterized by red, brown and green algae, sponges, anemones and hard corals. Waterward of this initial 65 foot zone, a relatively narrow zone of seagrasses is encountered. This zone of seagrass extends about 15 to 20 feet in width, forming a somewhat broken, noncontinuous band extending from north to south across the front of the property. Within this seagrass band, the primary growth is turtlegrass (Thalassia testudinum). There are smaller amounts of Cuban shoalweed (Halodule wrightii). Continuing waterward of this seagrass growth, the vegetative bottom coverage decreases with sandy patches becoming larger and more frequent. The bottom profile also becomes more rough and irregular, characterized by the presence of dissolved limerock holes as well as outcroppings. These holes and outcroppings provide excellent habitat for shelter-dependent fish and invertebrate species, such as spiny lobster and stone crabs. The area constitutes-prime nursery habitat for spiny lobsters and stone crabs. Water depth where the dock, as originally proposed, would terminate, which is in the area of the lobster and crab habitat, is approximately one and one-half to two feet deep at mean low water. The dock as presently proposed would extend some 30 feet beyond that area, or about 160 feet from the waterward edge of the shoreline mangrove fringe, or 190 feet from the mean high water line. Thus, the dock as presently proposed would terminate in a flat or sandy area which is somewhat deeper or about two to two and one-half feet deep at mean low water. Termination of the dock at that point, with boat traffic involved with the dock beginning and ending at that point will result in less likelihood of damage to the lobster and crab and other more fragile marine life habitat which occurs landward of the 190 foot termination point. At this point, the dominant marine species are patchy growths of red algae (Laurencia sp.). These growths are less susceptible to damage from prop-wash and wakes of boats than are the more landward areas characterized by turtlegrass, Cuban shoalweed and the "hole and outcrop" nursery habitat area for fish, lobsters and stone crabs. The physical and biological characteristics of the water bottom at this 190 foot distance offshore are more compatible with boat usage. The bottom here is characterized by hard caprock close to the surface, with a shallow overlying layer of inorganic, coarse-grained sediment consisting primarily of pulverized rock. There are very little or no seagrasses at this point. The applicant's boat draws approximately 12 inches of water underway and 18 inches at rest, and the dock is for the private use of the applicant only. The water depth at the termination point of the dock effectively precludes the applicant from navigating to and from the proposed dock with a significantly larger, more powerful boat and thus the physical characteristics of the water depth and hard bottom existing at the dock site themselves effectively limit the likelihood of harmful prop scouring or boat grounding damage. Impacts on water quality caused by the installation and operation of the proposed dock to the extent of its use by the applicant's private boat only, will be minimal. Some turbidity and disruption of marine life will inevitably occur during construction, but this will have no serious impact on either water quality or marine resources. The dock, as it is proposed to be constructed, will be at least three feet above mean high water level. It will be sufficiently narrow in width so as to preclude significant shading of seagrasses from sunlight and resultant death or damage to the seagrass beds between the end of the dock and the mean high water line, such that no water quality violation or harm to these marine resources will ensue. The proposed construction will not eliminate valuable marine resources in Niles Channel and will have no immediate or long-term adverse impact on the quantity or quality of the State's natural marine resources through the loss of habitat in the Niles Channel area involved. Because of the varying amounts of wetlands encompassed in the lots in the Niles Channel subdivision, it is unlikely that all of the lots in the area will be developed, or that a great number of docks similar to the proposed dock will be constructed. The Petitioner's expert witness, Mr. Robertson, established that less than half of the lots in this subdivision are suitable for or likely to be developed. The Petitioner's own witness, Fahrer, also established that Monroe County is planning to restrict development in this area through their zoning power. Accordingly, there is no reasonable expectation that many similar docks will be constructed in the Niles Channel area. Further, the recent amendments to the DER's organic statutes and related rules which took effect on October 1, 1984 mandate consideration of additional restrictive criteria involving effects of such projects on wildlife habitat, which will further serve to restrict development along the shoreline in this area. The shoreline in this subdivision is essentially undeveloped, with only one other dock presently in place, which is longer and extends further into Niles Channel than does the proposed dock. Although there was testimony by witnesses for Petitioner that the proposed dock would entail bone fishermen having to navigate out and around the dock, this testimony does not establish the premise that the dock will pose a serious impediment to navigation. The proposed dock may add slightly to the disruption of some recreational fishing navigation, however, since the adjacent property has the longer dock already in place, any disruption caused by this proposed shorter dock will not be significant and will not be contrary to the public interest in terms of navigation impediment.

Recommendation Having considered the foregoing Findings of Fact, Conclusions of Law, the evidence of record, the candor and demeanor of the witnesses and the pleadings and arguments of the parties, it is, therefore RECOMMENDED: That the State of Florida, Department of Environmental Regulation grant the application of Debra Flynn for a dock construction permit in accordance with the conditions delineated above. DONE and ENTERED this 9th day of April, 1985 in Tallahassee, Florida. P. MICHAEL RUFF Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 9th day of April, 1985. COPIES FURNISHED: Douglas H. MacLaughlin, Esq. James L. Torres, Legal Intern Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32301 James Hendricks, Esq. 317 Whitehead Street Key West, Florida 33040 Joel L. Beardsley Route 2, Box 441 Summerland Key, Florida 33042 Victoria Tschinkel, Secretary Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32301

Florida Laws (5) 120.57253.77403.087403.412403.905
# 3
RALPH JENSEN vs. DEPARTMENT OF ENVIRONMENTAL REGULATION, 89-002064 (1989)
Division of Administrative Hearings, Florida Number: 89-002064 Latest Update: Nov. 14, 1989

Findings Of Fact Based on the oral and documentary evidence presented at the hearing, my observation of the witnesses and the entire record compiled herein, I make the following findings of fact: On November 17, 1988, Petitioner filed an application with Respondent, Department of Environmental Regulation (DER) for a permit to fill submerged areas waterward of the mean high water line abutting certain property Petitioner owns on Big Pine Key. Petitioner also proposed to place a riprap revetment over seagrass in the submerged area, and pilings for a stilted structure in the submerged areas. Petitioner purchased the lot in question on September 8, 1988. There is no habitable structure currently on the property and Petitioner wishes to build a cottage on the lot. The intended purpose of the filling is to enlarge the existing lot so that Petitioner will have adequate area to build a cottage upon, and to stop any erosion that might be occurring. The area to be filled is within the Florida Keys Special Waters, and is classified as Outstanding Florida Water by the Department of Environmental Regulation pursuant to Rule 17.3041(4)(b), Florida Administrative Code. The area is located within the National Key Deer Wildlife Refuge. The area proposed to be filled is further classified as Class III Waters. Although Petitioner contends that he is simply trying to reclaim a portion of his lot which has eroded, the evidence of erosion was very slight and only found in a small area where the property adjoins the vertical seawall of the adjacent property. This particular section is very different from the rest of the shoreline. There is not much vegetation in this area. Aerial photography taken of the property in 1959 and 1972 demonstrates that there has been not been a significant change in the size of the lot in the last thirty years. This conclusion is supported by the physical evidence at the property site. Petitioner has not affirmatively demonstrated that vegetative stabilization would not prevent any erosion that might be occurring. Along the shoreline of the area to be filled are buttonwoods and sea daisy and mangrove seedlings. The submerged area proposed to be filled is very diverse and productive. It includes seagrasses, several types of algae, several macroinvertibrates, and forage fish. The area to be filled is currently very healthy and there are no signs of heavy boat usage in the area. The algae that exists in the area proposed to be filled serves as a food source for fish, and as a helpful filter of floating particles. The dense, constant growth of seagrass in this area provides food for fish, stabilizes sediments, absorbs pollutants from the water, and provides shelter to fish. Any filling of this area would result in the direct elimination of dense, healthy seagrass beds. The proposed filling will result in a drop in the diversity of organisms existing in the filled area. This will cause a violation of the DER's standards for biological integrity. The proposed construction and filling is expected to violate the DER's Class III standards for turbidity. By directly eliminating an area of productive habitat, this project would adversely affect fish and other aquatic wildlife. The loss of the algae and seagrass vegetation will lead to a decrease in fishery production and marine productivity. The filling proposal does not include any measures designed to mitigate for or offset these expected adverse impacts. The residential structure proposed to be built over the fill is expected to cause additional adverse environmental impacts due to nutrient input from the residence.

Florida Laws (1) 120.57
# 4
BAYSHORE HOMEOWNERS ASSOCIATION vs. GROVE ISLE, INC., AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 79-002186 (1979)
Division of Administrative Hearings, Florida Number: 79-002186 Latest Update: Apr. 08, 1980

The Issue Has the applicant, Grove Isle, Ltd. provided reasonable assurances and affirmatively demonstrated that its proposed marina is clearly in the public interest and will not lower the existing ambient water quality of Biscayne Bay, a designated outstanding Florida water?

Findings Of Fact On March 13, 1978 an application was made to DER for a water quality control permit to construct a wet-slip marina on the west side of Grove Isle, formerly known as Fair Isle and Sailboat Key. The original plan for the marina, which was initially objected to by the Department of Environmental Regulation, was modified to protect a bed of seagrasses extending about 30 feet wide in a band along the west side of the island. While the plans were being modified and consultations with other government permitting agencies were in progress, the application was "deactivated" from September 27, 1978 until March 30, 1979. As a result of its investigation and review, DER on October 23, 1979, issued a letter of intent to grant the permit to Grove Isle, Inc. The permit if granted, would allow the applicant to construct six concrete fixed piers, five "T" shaped, one "L" shaped, with a boat docking capacity of 90 pleasure boats. The piers will extend a maximum of 165 feet offshore from an existing concrete bulkhead. The width of the piers will be 8 feet from the bulkhead to a point 41 feet offshore, and then increased to a width of 10 feet. A sewage pump-out facility is also proposed. Attached to that letter of intent were the following conditions: Adequate control shall be taken during the construction so that turbidity levels outside a 50 foot radius of the work area do not exceed 50 J.C.U's, as per Section 24-11, of the Metropolitan Dade County Code. During construction, turbidity samples shall be collected at a mid-depth twice daily at a point 50 feet up stream and at a point 50 feet down stream from the work area. The contractor shall arrange to have turbidity sample results reported to him within one hour of collection. Turbidity monitoring reports shall be submitted weekly to DER and to the Metropolitan Dade County Environmental Resources Management (MDCERM) If turbidity exceeds 50 J.C.U's beyond a 50 foot radius of the work area, turbidity curtains shall be placed around the work area and MDCERM notified immediately. Turbidity samples shall be collected according to condition two above, no later than one hour after the installation of the turbidity curtain. It turbidity levels do not drop below 50 J.C.U's within one hour of installation of the curtain all construction shall be halted. Construction shall not be resumed until the contractor has received authorization from MDCERM. No live-a-board vessels (permanent or transient) shall be docked at this facility unless direct sewage pump-out connections are provided at each live-a-board slip. A permanent pump-out station shall be installed and maintained for further removal of sewage and waste from the vessels using this facility. Compliance with this requirement will entail the applicant's contacting the Plan Review Section of MDCERM for details concerning connection to an approved disposal system. Boat traffic in the shallow 30 foot wide dense seagrass area which parallels the shoreline shall be restricted by the placement of wood piles on 6 foot centers along the entire shoreline facing the marina. The channel from this marina to deeper water in Biscayne Bay shall be marked to prevent boats from straying into adjacent shallow areas. This will prevent habitat destruction. A chemical monitoring program shall be established to determine the effect of this marina on the water quality of this section of Biscayne Bay. Surface and mid-depth samples shall be collected at three points in the project area and at one background station. Parameters shall include, but not be limited to dissolved oxygen, pH, salinity, temperature, total coliform and fecal coliform and fecal streptococci bacteria, oil and grease, biochemical oxygen demand, and turbidity. Background samples shall be collected prior to construction and quarterly for a minimum of one year after 90 percent occupancy of the marina. In addition to the chemical monitoring program, a benthic community monitoring program is to be established. Samples of the benthic seagrass community within and adjacent to the project area are to be collected prior to construction and quarterly for a minimum of one year after 90 percent occupancy of the marina. Should either monitoring program detect dissimilar changes at its monitoring and control stations, DER and MDCERM shall be notified of the results. The monitoring programs shall be reviewed and approved by DER and MDCERM prior to implementation. Monitoring reports shall be submitted to DER and MDCERM and the United States Corps of Engineers on regular basis. Warning signs shall be posted in the marina area to advise marina users that manatees frequent the area and caution should be taken to avoid collisions with them. With the foregoing conditions imposed, the Department concluded that no significant immediate or long term negative biological impact is anticipated and state water quality standards should not be violated as a result of the proposed construction. Grove Isle, Inc., has agreed to comply with all the conditions established by the DER letter of intent to grant the permit. Grove Isle is a spoil bank in Biscayne Bay located approximately 700 feet east of the Florida mainland. It is linked to the mainland by a two-lane concrete bridge. The island is currently under development for a 510 unit condominium community with associated facilities such as a restaurant, hotel, and the proposed marina. The island is surrounded by a concrete bulkhead constructed many years ago. No changes in the bulkhead line are proposed. Grove Isle, Inc., proposes constructing the marina on concrete piles driven into the Bay bottom from a shallow draft barge. During construction there would be some turbidity caused from the disruption of the Bay sediment. This can however be adequately controlled by the use of turbidity curtains during construction. The construction will not require any dredging or filling. In the immediate marina site the most significant biota are a 30 foot wide bed of seagrasses. There are no other important biota because at one time the area was extensively dredged to create the island. There are no oyster or clam beds nearby. While lobsters may have once frequented the area, they too are no longer present. The water depth in the area ranges from 1 foot near the island bulkhead to 12 feet offshore to the west of the island. This particular seagrass bed consist primarily of turtle grass (thalassia, testudinum) with some Cuban Shoal Weed (Halodule, Wrightii). Protection for these grasses will be provided by a buffer zone between the island and the boat slips. The grassy zone will be bordered by a row of dolphin piles to exclude boat traffic. Because the grass requires sunlight for photosynthesis and therefore life, the six piers will have grated walkways where they pass over the grass. This will allow sunlight to reach below. In addition to the small grass bed on the west of the island there are extensive beds to the northeast, east and south of the island that extend several hundred yards from the island in water depths of three to ten feet. If boat traffic in the vicinity is markedly increased due to the existence of the marina, it is conceivable that the number of propeller scars in these shallow beds could increase. At the present time the beds are already traversed by boats, some of which are owned by Petitioner's members. There are already for example, approximately 50 crafts which operate from the nearby mainland or from Pelican Canal directly to the north of the island. Propeller scars take up to fifteen years to heal yet the number of scars in the Grove Isle area is insignificant and even a tripling of them from an additional 90 boats would still be de minimus. Potential damage to the seagrasses on the north side of the island will be minimized by the planned installation of navigation markers by Grove Isle. These markers will channel boats into water of a navigable depth and lessen the number of groundings and near groundings which cause the scarring. There is evidence that pleasure boats by their very existence and operation in the water are potential pollution sources. For instance, various maintenance chemicals such as anti-fouling bottom paint and wood cleaner have the ability, if used in sufficient quantity, to harm marine life. The fueling of engines and sewage discharge from boats are additional pollution sources. There was however, no showing that the location of up to 90 pleasure and sport fishing craft at the proposed marina site would in any way cause a degradation of water quality below the acceptable standards for Class III waters. At the present time, the marina site has adequate flushing to disburse those pollutants which may be generated by the marina operations. While a hydrographic survey was not requested by DER or provided by Grove Isle at the time the permit application was made, the testimony of Dr. Echternacht at the time of the Hearing provided adequate assurances respecting the hydrographic characteristics of the proposed site. The proposed marina will have no fueling or maintenance facilities. No live-a-board craft will be allowed at the marina. Both Mr. Wm. Cleare Filer and David A. Doheny live close to Grove Isle. Mr. Doheny's residence is on the mainland facing the proposed marina site and Mr. Filer's house is on Pelican Canal. They use the waters of Biscayne Bay around Grove Isle for recreation. If the quality of the water in the proposed marina site were lessened their substantial interest would be affected. Biscayne Bay is classified as a Class III water and is in the Biscayne Bay Aquatic Preserve. Careful considerations has been given to each of the proposed findings of fact submitted by the parties. To the extent that they are not contained in this Order, they are rejected as being either not supported by competent evidence or as immaterial and irrelevant to the issues determined here.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED: That a Final Order be entered by the State of Florida, Department of Environmental Regulation, determining that the requested water quality control permit and certification be issued subject to the conditions contained in the Notice of Intent to Issue Permit and that the Relief requested by the Petitioners be denied and their Petitions be dismissed. DONE and ENTERED this 22nd day of February, 1980, in Tallahassee, Florida. MICHAEL P. DODSON Hearing Officer Division of Administrative Hearings Room 101, Collins Building Tallahassee, Florida 32301 (904) 488-9675 COPIES FURNISHED: David A. Doheny, Esquire 1111 South Bayshore Drive Miami, Florida 33131 Wm. Cleare Filer 3095 Northwest 7th Street Miami, Florida 33125 Joel Jaffer 2479 Southwest 13th Street Miami, Florida 33145 Randall E. Denker, Esquire Assistant General Counsel Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32301 Larry S. Stewart, Esquire Frates, Floyd, Pearson, Stewart, Richmond & Greer One Biscayne Tower 25th Floor Miami, Florida 33131 ================================================================= AGENCY FINAL ORDER ================================================================= STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL REGULATION BAYSHORE HOMEOWNERS ASSOCIATION, INC., et al., Petitioner, vs. CASE NO. 79-2186 79-2324 STATE OF FLORIDA, 79-2354 DEPARTMENT OF ENVIRONMENTAL REGULATION, and GROVE ISLE, LIMITED, Respondent. /

Florida Laws (8) 120.50120.52120.57258.37258.42403.021403.087403.088
# 5
GLORIA BENOIT vs CITY OF DELTONA AND ST. JOHNS RIVER WATER MANAGEMENT DISTRICT, 04-002401 (2004)
Division of Administrative Hearings, Florida Filed:Deltona, Florida Jul. 12, 2004 Number: 04-002401 Latest Update: Jul. 25, 2005

The Issue The issue is whether the applicant for an Environmental Resource Permit ("ERP"), the City of Deltona ("City" or "Applicant"), has provided reasonable assurance that the system proposed complies with the water quantity, environmental, and water quality criteria of the St. Johns River Water Management District's ("District") ERP regulations set forth in Florida Administrative Code Chapter 40C-4, and the Applicant's Handbook: Management and Storage of Surface Waters (2005).

Findings Of Fact The District is a special taxing district created by Chapter 373, Florida Statutes, charged with the duty to prevent harm to the water resources of the District, and to administer and enforce Chapter 373, Florida Statutes, and the rules promulgated thereunder. The City of Deltona is a municipal government established under the provisions of Chapter 165, Florida Statutes. The Lake Theresa Basin is comprised primarily of a system of interconnected lakes extending from Lake Macy in the City of Lake Helen to the Butler Chain of Lakes (Lake Butler and Lake Doyle). The Lake Theresa Basin is land-locked and does not have a natural outfall to Lake Monroe and the St. Johns River. In 2003, after an extended period of above-normal rainfall in the Deltona area, the lakes within the land-locked Lake Theresa Basin staged to extremely high elevations that resulted in standing water in residential yards, and rendered some septic systems inoperable. Lake levels within the Lake Theresa Basin continued to rise and were in danger of rising above the finished floor elevations of some residences within the basin. On March 25, 2003, the District issued an Emergency Order (F.O.R. No. 2003-38) authorizing the construction and short-term operation of the Lake Doyle and Lake Bethel Emergency Overflow Interconnection. Since wetland and surface water impacts would occur, the Emergency Order required the City of Deltona to obtain an ERP for the system. The project area is 4.1 acres, and the system consists of a variable water structure on the west shore of Lake Doyle connected to a series of pipes, swales, water control structures, and wetland systems which outfall to a finger canal of Lake Bethel, with ultimate discharge to Lake Monroe and the St. Johns River. The first segment of the system extends downstream from the weir structure on the west shore of Lake Doyle via a pipe entrenched in the upland berm of the Sheryl Drive right-of-way. The pipe passes under Doyle Road and through xeric pine-oak uplands to the northeast shore of a large (approximately 15 acres) deepwater marsh. Water flows south through the deepwater marsh where it outfalls through four pipes at Ledford Drive. Two of the four pipes are overflow structures, controlled by canal gates. The pipes at Ledford Drive discharge into a ditch and into a large (greater than 20 acres) shallow bay swamp. The south end of the bay swamp is defined (and somewhat impounded) by a 19th Century railroad grade. Water flows through the bay swamp where it outfalls through five pipes at the railroad grade. Three of the five pipes are overflow structures, controlled by channel boards. The pipes at the railroad grade discharge to a 1500-foot long finger canal that was dug some time during the period 1940-1972 from the north central shore of Lake Bethel. The overflow interconnection system has three locations whereby the system can be shut down: 1) Lake Doyle--a control weir, controlled by three sluice gates; 2) Ledford Drive--two thirty-inch reinforced concrete pipes, controlled by canal gates; and 3) railroad grade--three thirty-inch reinforced concrete pipes, controlled by channel boards (collectively referred to as "Overflow Structures"). The Overflow Structures are designed to carry the discharge of water from Lake Doyle to Lake Bethel. With the Overflow Structures closed the system returns to pre-construction characteristics, meaning there will be no increase or decrease in the quantity or quality of water throughout the path of the system as a result of the project. An unequivocal condition of the permit is that the system would operate with all of the Overflow Structures closed. As an added assurance, the City proposes to place a brick and mortar plug in the Lake Doyle weir structure outfall pipe to prevent any discharge from the weir. The City has submitted to the District preliminary plans for a future phase in which the system would be modified for the purpose of alleviating high water levels within the Lake Theresa Basin when the water level in Lake Doyle rises above an elevation of 24.5 feet. The District shall require a separate permit application to be submitted for such future plans. Petitioner, Barbara Ash, has lived on Lake Theresa for 19 years. Ms. Ash lives upstream from the area of the weir that will be plugged in accordance with the ERP. She does not trust either the City of Deltona to comply with or the District to enforce the conditions of the ERP applied for by the City. Petitioner, Barbara Ash, also served as the qualified representative for Petitioners, Francell Frei, Bernard J. and Virginia Patterson, and Ted and Carol Sullivan. Ms. Ash represented that Ms. Frei has lived on Lake Theresa for 12 years, and both the Pattersons and the Sullivans live on Lake Louise, which is within the area of concern in this proceeding. Petitioner, Diana Bauer, has lived on Lake Theresa since February 2004. She fears that the lake will become too dry if the system is allowed to flow. She also believes the wildlife will be adversely affected if the water levels are too low since many species need a swampy or wet environment to thrive. She fears her property value will decrease as a result of the approval of the ERP. She also does not trust either the City to comply with or the District to enforce the conditions of the ERP. Petitioner, Howard Ehmer, lives two to three hundred yards down Lake Theresa from Ms. Bauer. He is concerned about the lake bed being too dry and attracting people on all terrain vehicles who enjoy driving around the lake bottom. He is concerned about his property value decreasing if the lake bed is dry. Further, when the lake level is too low, people cannot enjoy water skiing, boating, and fishing on Lake Theresa. Petitioner, Phillip Lott, a Florida native, has also owned and lived on property abutting Lake Theresa since 1995. Mr. Lott has a Ph.D. in plant ecology, and M.P.A. in coastal zone studies, an M.B.A. in international business, and a B.S. in environmental resource management and planning. Mr. Lott has been well acquainted with the water levels on Lake Theresa for many years. Based upon his personal observations of the lake systems in the Deltona area over the years, Mr. Lott has seen levels fluctuate greatly based upon periods of heavy and light rainfall. Mr. Lott is concerned that the District will permit the City to open the weir to let water flow through the system and cause flooding in some areas and low water levels in other areas. He fears that the District will allow the water to flow and upset the environmental balance, but he admits that this ERP application is for a closed system that will not allow the water to flow as he fears. Mr. Lott similarly does not trust the City to comply with and the District to enforce the conditions of the ERP. Petitioners, James E. and Alicia M. Peake, who were represented by Steven L. Spratt at hearing as their qualified representative, live on Lake Louise, which is interconnected with the Lake Theresa basin. The Peakes are concerned that if the level of Lake Louise drops below 21 feet, nine inches, they will not be able to use the boat launch ramps on the lake. Petitioner, Steven L. Spratt, also lives on Lake Louise, and is concerned about the water levels becoming so low that he cannot use the boat launch on the lake. He has lived on the lake since 2000, and remembers when the water level was extremely low. He fears that approval of the ERP in this case will result in low levels of water once again. Petitioner, Gloria Benoit, has live on Lake Theresa for two years. She also enjoys watching recreational activities on the lake, and feels that approval of the ERP will devalue her lakefront property. Ms. Benoit appeared at the first day of the hearing, but offered no testimony on her behalf. J. Christy Wilson, Esquire, appeared prior to the final hearing as counsel of record for Petitioners, Steven E. Larimer, Kathleen Larimer, and Helen Rose Farrow. Neither Ms. Wilson nor any of the three Petitioners she represented appeared at any time during the hearing, filed any pleadings seeking to excuse themselves from appearing at the final hearing, or offered any evidence, testimony, pre- or post- hearing submittals. Petitioner, Gary Jensen, did not appear at hearing, did not file any pleadings or papers seeking to be excused from appearing at the final hearing, and did not offer any evidence, testimony, pre- or post-hearing submittals. Both the City and the District recognize that areas downstream from the project site, such as Stone Island and Sanford, have experienced flooding in the past in time of high amounts of rainfall. The system proposed by the City for this ERP will operate with the overflow structures closed and a brick and mortar plug in the outfall pipe to prevent water flow from Lake Doyle to Lake Bethel. So long as the overflow structures are closed, the system will mimic pre-construction flow patterns, with no increase in volume flowing downstream. The District has considered the environment in its proposed approval of the ERP. The area abutting the project is little urbanized and provides good aquatic and emergent marsh habitat. With the exception of the western shore area of the deepwater marsh ("west marsh area"), the bay swamp and remaining deepwater marsh area have good ecological value. In the 1940's, the west marsh area was incorporated into the drainage system of a poultry farm that occupied the site. This area apparently suffered increased nutrient influxes and sedimentation that contributed to a proliferation of floating mats of aquatic plants and organic debris. These tussocks reduced the deepwater marsh's open water and diminished the historical marsh habitat. Water under the tussocks is typically anoxic owing to total shading by tussocks and reduced water circulation. Thick, soft, anaerobic muck has accumulated under the matted vegetation. Exotic shrubs (primrose willow Ludwigia peruvania) and other plants (cattails Typha spp.) dominate the tussocks. The construction of the project, from the 2003 Emergency Order, resulted in adverse impacts to 1.3 acres of wetlands having moderately high- to high ecological value and 0.2 acres of other surface waters. The 0.2 acre impact to other surface waters was to the lake bottom and the shoreline of Lake Doyle where the weir structure was installed. The 0.3 acres of wetland impacts occurred at the upper end of the deepwater marsh where the pipe was installed. The largest wetland impact (1.0 acre) was to the bay swamp. The bay swamp is a shallow body dominated by low hummocks and pools connected inefficiently by shallow braided channels and one acre is filled with a 1-2 foot layer of sediment following swamp channelization. Disturbance plants (e.g., primrose willow, Ludwigia peruvania, and elderberry Sambucus Canadensis) now colonize the sediment plume. Pursuant to the District's elimination and reduction criteria, the applicant must implement practicable design modifications, which would reduce or eliminate adverse impacts to wetlands and other surface waters. A proposed modification, which is not technically capable of being done, is not economically viable, or which adversely affects public safety through endangerment of lives or property is not considered "practicable." The City reduced and/or eliminated the impacts to the lake bottom and shoreline of Lake Doyle and deepwater marsh, to the extent practicable. The impacts were the minimum necessary to install the weir structure and pipe for the system; the weir structure and pipe were carefully installed on the edges of the wetland and surface water systems, resulting in a minimum amount of grading and disturbance. To compensate for the loss of 1.3 acres of wetlands and 0.2 acres of other surface waters, the City proposes to preserve a total of 27.5 acres of wetlands, bay swamp, marsh, and contiguous uplands. Included in this 27.5 acres are 6.4 acres of the west marsh, which are to be restored. The parties stipulated that the mitigation plan would adequately compensate for losses of ecological function (e.g. wildlife habitat and biodiversity, etc.) resulting from the project. Water quality is a concern for the District. Lake Monroe is included on the Florida Department of Environmental Protection's verified list of impaired water bodies for nitrogen, phosphorous, and dissolved oxygen. Water quality data for Lake Monroe indicate the lake has experienced high levels of nitrogen and phosphorous and low levels of dissolved oxygen. Prior to construction of the project, there was no natural outfall from the Lake Theresa Basin to Lake Monroe and therefore no contribution from this basin to nitrogen and phosphorous loadings to Lake Monroe. Lake Colby, Three Island Lakes (a/k/a Lake Sixma), and the Savannah are surface waters within the Lake Theresa Basin for which minimum levels have been adopted pursuant to Florida Administrative Code Chapter 40C-8. The system will operate with the overflow structures closed and a brick and mortar plug in the outfall pipe to prevent water flow from Lake Doyle to Lake Bethel, resulting in no outfall from the Theresa Basin to Lake Monroe. Minimum flows established for surface waters within the Lake Theresa Basin will not be adversely impacted. Under the first part of the secondary impact test, the City must provide reasonable assurance that the secondary impacts from construction, alteration, and intended or reasonable expected use of the project will not adversely affect the functions of adjacent wetlands or surface waters. The system is designed as a low intensity project. As proposed, little activity and maintenance are expected in the project site area. The reasonably expected use of the system will not cause adverse impacts to the functions of the wetlands and other surface waters. None of the wetland areas adjacent to uplands are used by listed species for nesting or denning. In its pre-construction state, the project area did not cause or contribute to state water quality violations. Under the second part of the secondary impact test, the City must provide reasonable assurance that the construction, alteration, and intended or reasonably expected uses of the system will not adversely affect the ecological value of the uplands to aquatic or wetland dependent species for enabling existing nesting or denning by these species. There are no listed threatened or endangered species within the project site area. Under the third part of the secondary impact test, and as part of the public interest test, the District must consider any other relevant activities that are closely linked and causally related to any proposed dredging or filling which will cause impacts to significant historical and archaeological resources. When making this determination, the District is required, by rule, to consult with the Division of Historical Resources. The Division of Historical Resources indicated that no historical or archaeological resources are likely present on the site. No impacts to significant historical and archaeological resources are expected. Under the fourth part of the secondary impact test, the City must demonstrate that certain additional activities and future phases of a project will not result in adverse impacts to the functions of wetlands or water quality violations. The City has submitted to the District preliminary plans for a future phase in which the system would be modified for the purpose of alleviating high water levels within the Lake Theresa Basin when the level in Lake Doyle rises above an elevation of 24.5 feet. Based upon the plans and calculations submitted, the proposed future phase, without additional measures, could result in minor increases in the loadings of nitrogen and phosphorous to Lake Monroe. Lake Monroe is included on the Florida Department of Environmental Protection's verified list of impaired water bodies due to water quality data indicating the lake has experienced high levels of nitrogen and phosphorous, and low levels of dissolved oxygen. Under this potential future phase, there would be an outfall from the Lake Theresa Basin to Lake Monroe. To address the impact on water quality of this potential future phase, the City has submitted a loading reduction plan for nitrogen, phosphorous, and dissolved oxygen. The plan includes compensating treatment to fully offset the potential increased nutrient loadings to Lake Monroe. Specifically, the loading reduction plan includes: Construction and operation of compensating treatment systems to fully offset anticipated increased nutrient loadings to Lake Monroe. Weekly water quality monitoring of the discharge from Lake Doyle for total phosphorous and total nitrogen. A requirement that the overflow structure be closed if the total phosphorous level reaches 0.18 mg/l or higher or the total nitrogen level reaches 1.2 mg/l or higher in any given week and will remain closed until levels fall below those limits. The implementation of these water quality mitigation measures will result in a net improvement of the water quality in Lake Monroe for nitrogen, phosphorous, or dissolved oxygen. The future phase was conceptually evaluated by the District for impacts to wetland functions. The future phase as proposed could result in adverse impacts to wetland functions. Operation of the system with the overflow structures open could impact the bay swamp and deepwater marsh. The City has demonstrated that any adverse impacts could be offset through mitigation. Based upon the information provided by the City and general engineering principles, the system is capable of functioning as proposed. The City of Deltona will be responsible for the operation, maintenance, and repair of the surface waster management system. A local government is an acceptable operation and maintenance entity under District rules. The public interest test has seven criteria. The public interest test requires the District to evaluate only those parts of the project actually located in, on, or over surface waters or wetlands, to determine whether a factor is positive, neutral, or negative, and then to balance these factors against each other. The seven factors are as follows: the public health, safety, or welfare of others; conservation of fish and wildlife and their habitats; fishing, recreational value, and marine productivity; temporary or permanent nature; 5) navigation, water flow, erosion, and shoaling; 6) the current condition and relative value of functions; and 7) historical and archaeological resources. There are no identified environmental hazards or improvements to public health and safety. The District does not consider impacts to property values. To offset any adverse impacts to fish and wildlife and their habitats, the City has proposed mitigation. The areas of the project in, on, or over wetlands do not provide recreational opportunities. Construction and operation of the project located in, on, or over wetlands will be permanent in nature. Construction and operation of the project located in, on, or over wetlands will not cause shoaling, and does not provide navigational opportunities. The mitigation will offset the relative value of functions performed by areas affected by the proposed project. No historical or archaeological resources are likely on the site of the project. The mitigation of the project is located within the same drainage basin as the project and offsets the adverse impacts. The project is not expected to cause unacceptable cumulative impacts.

Recommendation Based upon the Findings of Fact and Conclusions of Law, it is RECOMMENDED that a Final Order be entered granting the City of Deltona's application for an environmental resource permit with the conditions set forth in the Technical Staff Report, and dismissing the Petitions for Formal Administrative Hearing filed by Gary Jensen in Case No. 04-2405, and by Steven E. Larimer, Kathleen Larimer, and Helen Rose Farrow in Case No. 04-3048. DONE AND ENTERED this 27th day of May, 2005, in Tallahassee, Leon County, Florida. S ROBERT S. COHEN Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 27th day of May, 2005. COPIES FURNISHED: George Trovato, Esquire City of Deltona 2345 Providence Boulevard Deltona, Florida 32725 Diana E. Bauer 1324 Tartan Avenue Deltona, Florida 32738 Barbara Ash, Qualified Representative 943 South Dean Circle Deltona, Florida 32738-6801 Phillip Lott 948 North Watt Circle Deltona, Florida Howard Ehmer Nina Ehmer 32738-7919 1081 Anza Court Deltona, Florida 32738 Francell Frei 1080 Peak Circle Deltona, Florida 32738 Bernard T. Patterson Virginia T. Patterson 2518 Sheffield Drive Deltona, Florida 32738 Kealey A. West, Esquire St. Johns River Water Management District 4049 Reid Street Palatka, Florida 32177 J. Christy Wilson, Esquire Wilson, Garber & Small, P.A. 437 North Magnolia Avenue Orlando, Florida 32801 Gloria Benoit 1300 Tartan Avenue Deltona, Florida 32738 Gary Jensen 1298 Tartan Avenue Deltona, Florida 32738 James E. Peake Alicia M. Peake 2442 Weatherford Drive Deltona, Florida 32738 Steven L. Spratt 2492 Weatherford Drive Deltona, Florida 32738 Ted Sullivan 1489 Timbercrest Drive Deltona, Florida 32738 Kirby Green, Executive Director St. Johns River Water Management District 4049 Reid Street Palatka, Florida 32177

Florida Laws (3) 120.569120.57373.086 Florida Administrative Code (6) 40C-4.30140C-4.30240C-4.33140C-4.75162-302.30062-4.242
# 6
COUNCIL OF CIVIC ASSOCIATION, INC. vs KORESHAN UNITY FOUNDATION, INC., AND DEPARTMENT OF ENVIRONMENTAL PROTECTION, 98-000999 (1998)
Division of Administrative Hearings, Florida Filed:Fort Myers, Florida Mar. 03, 1998 Number: 98-000999 Latest Update: Sep. 17, 1998

The Issue The issue is whether Respondent Koreshan Unity Foundation, Inc., is entitled to a environmental resource permit for the construction of a wooden footbridge over the Estero River east of U.S. Route 41 and authorization to obtain by easement a right to use sovereign submerged lands.

Findings Of Fact Respondent Koreshan Unity Foundation, Inc. (Koreshan) is a not-for-profit corporation dedicated to the preservation of the Koreshan heritage. Koreshan derives its heritage from a largely self-sufficient community that occupied land in south Lee County. For several years, Koreshan has owned a parcel of 14.56 acres at the southeast corner of U.S. Route 41 and the Estero River. This parcel is bounded on the south by Corkscrew Road and contains an amphitheater and historical house, midway between the river and Corkscrew Road. The south end of this parcel contains a museum and parking area with access to Corkscrew Road. The approximate dimensions of the 14.56-acre parcel are 544 feet along the river, 496 feet along Corkscrew Road, and about 1273 feet along the west and the east property lines. The west property line is U.S. Route 41. The right-of-way for U.S. Route 41 is wider at the southern two-thirds of the parcel than the northern one-third of the parcel. A sidewalk runs on the east side of U.S. Route 41 from north of the river, across the U.S. Route 41 bridge, along the west boundary of Koreshan's property, at least to an entrance near the middle of the 14.56-acre parcel. In October 1996, Koreshan acquired 8.5 acres of land at the northeast corner of the U.S. Route 41 and the river. The purpose of the acquisition was to provide parking for persons coming to Koreshan-sponsored events, such as music performances, at the 14.56-acre site. Koreshan rents a small portion of this northerly parcel to a canoe-rental business, which operates where the bridge and river meet. To assist their visitors-some of whom are elderly and disabled--in gaining access to the 14.56-acre site, on November 26, 1996, Koreshan filed an application for a permit and authorization to construct a wooden footbridge across the Estero River about 315 feet east of the U.S. Route 41 bridge. The source of the Estero River is to the east of the U.S. Route 41 bridge and the location of the proposed bridge. After passing under the U.S. Route 41 bridge, the river runs along the Koreshan state park, which is a short distance east of U.S. Route 41, before it empties into the Gulf of Mexico at Estero Bay, which is a state aquatic preserve. The portion of the river at the site of the proposed bridge is an Outstanding Florida Waterway (OFW) and a Class III water. The river is popular with canoeists and kayakers. Persons may rent canoes and kayaks at the canoe rental business operating on the 8.5-acre parcel or the Koreshan state park. Although most canoeists and kayakers proceed downstream toward the bay, a significant number go upstream past the U.S. Route 41 bridge. Upstream of the bridge, the river narrows considerably. Tidal currents reach upstream of the U.S. Route 41 bridge. At certain tides or in strong winds, navigating a canoe or kayak in this area of the river can be moderately difficult. Even experienced canoeists or kayakers may have trouble maintaining a steady course in this part of the river. Less experienced canoeists or kayakers more often have trouble staying on course and avoiding other boats, the shore, vegetation extending from the water or shoreline, or even the relatively widely spaced supports of the U.S. Route 41 bridge pilings, which are about 30 feet apart. Mean high water is at 1.11 feet National Geodetic Vertical Datum. The deck of the proposed footbridge would be 9 feet, 6 inches wide from rail to rail and 16 feet wide in total. The proposed footbridge would extend about 180 feet, spanning 84 feet of water from shore to shore. The bridge- ends would each be about 50 feet and would each slope at a rate of 1:12. The proposed footbridge would rest on nine pilings: four in the uplands and five in the submerged bottom. The elevation of the bottom of the footbridge from the water surface, at mean high water, would be 8 feet, 8 inches. The distance between the centers of the pilings would be 14 feet, and each piling would be of a minimum diameter of 8 inches. According to a special permit condition, the pilings would be treated with chromated copper arsenate, as a preservative, but they would be wrapped in impermeable plastic or PVC sleeves so as, in the words of the proposed permit, "to reduce the leaching of deleterious substances from the pilings." The proposed permit requires that the sleeves shall be installed from at least 6 inches below the level of the substrate to at least 1 foot above the seasonal highwater line and shall be maintained over the life of the facility. The proposed permit also requires that the footbridge be limited to pedestrian traffic only, except for wheelchairs. The permit requires the applicant to install concrete-filled steel posts adjacent to the bridge to prevent vehicles from using the bridge. The proposed permit requires that Koreshan grant a conservation easement for the entire riverbank running along both shorelines of Koreshan's two parcels, except for the dock and boat ramp used by the canoe-rental business. The proposed permit also requires Koreshan to plant leather fern or other wetland species on three-foot centers along the river banks along both banks for a distance of 30 feet. The proposed permit states that the project shall comply with all applicable water quality standards, including the antidegradation permitting requirements of Rule 62-4.242, Florida Administrative Code. Respondents did not raise standing as an affirmative defense. It appears that Petitioners or, in the case of corporate Petitioners, members and officers all live in the area of the Estero River and use the river regularly. For instance, Petitioner Dorothy McNeill resides one mile south of the proposed bridge on a canal leading to the Estero River, which she uses frequently. She is the president and treasurer of Petitioner Estero Conservancy, whose mission is to preserve the Estero River in its natural state. Petitioner Ellen W. Peterson resides on Corkscrew Road, 300-400 feet from the proposed footbridge. For 26 years, she has paddled the river several times weekly, usually upstream because it is prettier. She formerly canoed, but now kayaks. The record is devoid of evidence of the water- quality criteria for the Estero River at the time of its designation as an OFW or 1995, which is the year prior to the subject application. Koreshan has not provided reasonable assurance that the proposed footbridge would not adversely affect the water quality of the Estero River. Although the site of the proposed footbridge is devoid of bottom vegetation and there is no suggestion that this is anything but a natural condition for this part of the riverbottom, there is evidence that the proposed footbridge would adversely affect the water quality in two respects: turbidity caused by the pilings and leaching from the chromated copper arsenate applied to the pilings. The turbidity is probably the greater threat to water quality because it would be a permanent factor commencing with the completion of the installation of the pilings. The leaching of the heavy metals forming the toxic preservative impregnated into the pilings is probable due to two factors: damage to the PVC liner from collisions with inexperienced boaters and high-water conditions that exceed 1 foot over mean high water and, thus, the top of the liner. Both of these factors are exacerbated by flooding, which is addressed below. Koreshan also has failed to provide reasonable assurance that the proposed footbridge is clearly in the public interest under the seven criteria. The proposed footbridge would adversely affect the public health, safety, or welfare and the property of others through exacerbated flooding. South Lee County experienced serious flooding in 1995. In response, Lee County and the South Florida Water Management District have attempted to improve the capacity of natural flowways, in part by clearing rivers of snags and other impediments to flow, including, in the case of the Imperial River, a bridge. One important experience learned from the 1995 floods was to eliminate, where possible, structures in the river, such as snags and pilings, that collect debris in floodwaters and thereby decrease the drainage capacity of the waterway when drainage capacity is most needed. Longer term, the South Florida Water Management District is considering means by which to redirect stormwater from the Imperial River drainage to the Estero River drainage. The addition of five pilings (more as the river rose) would exacerbate flooding. On this basis alone, Koreshan has failed to provide reasonable assurance. Additionally, though, the HEC II model output offered by Koreshan does not consider flooding based on out-of-banks flows, but only on the basis of roadway flows. In other words, any assurances as to flooding in the design storm are assurances only that U.S. Route 41 will not be flooded, not that the lower surrounding land will not be flooded. Koreshan failed to provide reasonable assurance that the proposed activity would not adversely affect the conservation of fish and wildlife, for the reasons already stated with respect to water quality. Koreshan failed to provide reasonable assurance that the proposed activity would not adversely affect navigation or the flow of water. The flow of water is addressed above. Navigation is best addressed together with the next criterion: whether the proposed activity would adversely affect fishing or recreational values or marine productivity in the vicinity of the activity. Despite the presence of only two public launch sites, boating is popular on the Estero River. Reflective of the population growth of Collier County to the south and the area of Lee County to the north, the number of boaters on the Estero River has grown steadily over the years. The canoe- rental business located on the 8.5-acre parcel rented canoes or kayaks to over 10,000 persons in 1996. Many other persons launched their canoes or kayaks for free from this site and the nearby state park. Lee County businesses derive $800,000,000 annually from tourism with ecotourism a growing component of this industry. The Estero River is an important feature of this industry, and the aquatic preserve at the mouth of the river and the state park just downstream from the proposed footbridge provide substantial protection to the scenic and environmental values that drive recreational interest in the river. It is unnecessary to consider the aesthetic effect of a footbridge spanning one of the more attractive segments of the Estero River. The proposed footbridge and its five pilings effectively divide the river into six segments of no more than 14 feet each. This fact alone diminishes the recreational value of the river for the many canoeists and kayakers who cannot reliably navigate the U.S. Route 41 bridge pilings, which are more than twice as far apart. As to the remaining criteria, the proposed footbridge would be permanent and the condition and relative value of functions being performed by areas affected by the proposed activity is high. There is conflicting evidence as to whether the proposed footbridge would adversely affect the remnants of an historic dock, but it is unnecessary to resolve this conflict. The mitigation proposed by Koreshan does not address the deficiencies inherent in the proposed activity.

Recommendation It is RECOMMENDED that the Department of Environmental Protection enter a final order dismissing the petition of Petitioner Council of Civic Associations, Inc., and denying the application of Respondent Koreshan Unity Foundation, Inc., for an environmental resource permit and authorization to obtain an easement for the use of sovereign land. DONE AND ENTERED this 3rd day of August, 1998, in Tallahassee, Leon County, Florida. ROBERT E. MEALE Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 Filed with the Clerk of the Division of Administrative Hearings this 3rd day of August, 1998. COPIES FURNISHED: Kathy Malone Vice President and Treasurer Council of Civic Associations, Inc. Post Office Box 919 Estero, Florida 33919-0919 Reginald McNeill Dorothy McNeill, President Estero Conservancy, Inc. 26000 Park Place Estero, Florida 33928 Mark E. Ebelini Humphrey & Knott, P.A. 1625 Hendry Street, Suite 301 Fort Myers, Florida 33901 Phyllis Stanley, President 12713-3 McGregor Boulevard Fort Myers, Florida 33919 Cathy S. Reiman Cummings & Lockwood Post Office Box 413032 Naples, Florida 34101-3032 Francine M. Ffolkes Department of Environmental Protection Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 Kathy Carter, Agency Clerk Department of Environmental Protection Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 F. Perry Odom, General Counsel Department of Environmental Protection Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000

Florida Laws (9) 120.52120.57120.68253.77267.061373.4136373.414373.421403.031 Florida Administrative Code (8) 18-21.00318-21.00418-21.0040118-21.00518-21.005162-302.20062-302.70062-4.242
# 7
JAMES E. PEAKE AND ALICIA M. PEAKE vs CITY OF DELTONA AND ST. JOHNS RIVER WATER MANAGEMENT DISTRICT, 04-002409 (2004)
Division of Administrative Hearings, Florida Filed:Deltona, Florida Jul. 12, 2004 Number: 04-002409 Latest Update: Jul. 25, 2005

The Issue The issue is whether the applicant for an Environmental Resource Permit ("ERP"), the City of Deltona ("City" or "Applicant"), has provided reasonable assurance that the system proposed complies with the water quantity, environmental, and water quality criteria of the St. Johns River Water Management District's ("District") ERP regulations set forth in Florida Administrative Code Chapter 40C-4, and the Applicant's Handbook: Management and Storage of Surface Waters (2005).

Findings Of Fact The District is a special taxing district created by Chapter 373, Florida Statutes, charged with the duty to prevent harm to the water resources of the District, and to administer and enforce Chapter 373, Florida Statutes, and the rules promulgated thereunder. The City of Deltona is a municipal government established under the provisions of Chapter 165, Florida Statutes. The Lake Theresa Basin is comprised primarily of a system of interconnected lakes extending from Lake Macy in the City of Lake Helen to the Butler Chain of Lakes (Lake Butler and Lake Doyle). The Lake Theresa Basin is land-locked and does not have a natural outfall to Lake Monroe and the St. Johns River. In 2003, after an extended period of above-normal rainfall in the Deltona area, the lakes within the land-locked Lake Theresa Basin staged to extremely high elevations that resulted in standing water in residential yards, and rendered some septic systems inoperable. Lake levels within the Lake Theresa Basin continued to rise and were in danger of rising above the finished floor elevations of some residences within the basin. On March 25, 2003, the District issued an Emergency Order (F.O.R. No. 2003-38) authorizing the construction and short-term operation of the Lake Doyle and Lake Bethel Emergency Overflow Interconnection. Since wetland and surface water impacts would occur, the Emergency Order required the City of Deltona to obtain an ERP for the system. The project area is 4.1 acres, and the system consists of a variable water structure on the west shore of Lake Doyle connected to a series of pipes, swales, water control structures, and wetland systems which outfall to a finger canal of Lake Bethel, with ultimate discharge to Lake Monroe and the St. Johns River. The first segment of the system extends downstream from the weir structure on the west shore of Lake Doyle via a pipe entrenched in the upland berm of the Sheryl Drive right-of-way. The pipe passes under Doyle Road and through xeric pine-oak uplands to the northeast shore of a large (approximately 15 acres) deepwater marsh. Water flows south through the deepwater marsh where it outfalls through four pipes at Ledford Drive. Two of the four pipes are overflow structures, controlled by canal gates. The pipes at Ledford Drive discharge into a ditch and into a large (greater than 20 acres) shallow bay swamp. The south end of the bay swamp is defined (and somewhat impounded) by a 19th Century railroad grade. Water flows through the bay swamp where it outfalls through five pipes at the railroad grade. Three of the five pipes are overflow structures, controlled by channel boards. The pipes at the railroad grade discharge to a 1500-foot long finger canal that was dug some time during the period 1940-1972 from the north central shore of Lake Bethel. The overflow interconnection system has three locations whereby the system can be shut down: 1) Lake Doyle--a control weir, controlled by three sluice gates; 2) Ledford Drive--two thirty-inch reinforced concrete pipes, controlled by canal gates; and 3) railroad grade--three thirty-inch reinforced concrete pipes, controlled by channel boards (collectively referred to as "Overflow Structures"). The Overflow Structures are designed to carry the discharge of water from Lake Doyle to Lake Bethel. With the Overflow Structures closed the system returns to pre-construction characteristics, meaning there will be no increase or decrease in the quantity or quality of water throughout the path of the system as a result of the project. An unequivocal condition of the permit is that the system would operate with all of the Overflow Structures closed. As an added assurance, the City proposes to place a brick and mortar plug in the Lake Doyle weir structure outfall pipe to prevent any discharge from the weir. The City has submitted to the District preliminary plans for a future phase in which the system would be modified for the purpose of alleviating high water levels within the Lake Theresa Basin when the water level in Lake Doyle rises above an elevation of 24.5 feet. The District shall require a separate permit application to be submitted for such future plans. Petitioner, Barbara Ash, has lived on Lake Theresa for 19 years. Ms. Ash lives upstream from the area of the weir that will be plugged in accordance with the ERP. She does not trust either the City of Deltona to comply with or the District to enforce the conditions of the ERP applied for by the City. Petitioner, Barbara Ash, also served as the qualified representative for Petitioners, Francell Frei, Bernard J. and Virginia Patterson, and Ted and Carol Sullivan. Ms. Ash represented that Ms. Frei has lived on Lake Theresa for 12 years, and both the Pattersons and the Sullivans live on Lake Louise, which is within the area of concern in this proceeding. Petitioner, Diana Bauer, has lived on Lake Theresa since February 2004. She fears that the lake will become too dry if the system is allowed to flow. She also believes the wildlife will be adversely affected if the water levels are too low since many species need a swampy or wet environment to thrive. She fears her property value will decrease as a result of the approval of the ERP. She also does not trust either the City to comply with or the District to enforce the conditions of the ERP. Petitioner, Howard Ehmer, lives two to three hundred yards down Lake Theresa from Ms. Bauer. He is concerned about the lake bed being too dry and attracting people on all terrain vehicles who enjoy driving around the lake bottom. He is concerned about his property value decreasing if the lake bed is dry. Further, when the lake level is too low, people cannot enjoy water skiing, boating, and fishing on Lake Theresa. Petitioner, Phillip Lott, a Florida native, has also owned and lived on property abutting Lake Theresa since 1995. Mr. Lott has a Ph.D. in plant ecology, and M.P.A. in coastal zone studies, an M.B.A. in international business, and a B.S. in environmental resource management and planning. Mr. Lott has been well acquainted with the water levels on Lake Theresa for many years. Based upon his personal observations of the lake systems in the Deltona area over the years, Mr. Lott has seen levels fluctuate greatly based upon periods of heavy and light rainfall. Mr. Lott is concerned that the District will permit the City to open the weir to let water flow through the system and cause flooding in some areas and low water levels in other areas. He fears that the District will allow the water to flow and upset the environmental balance, but he admits that this ERP application is for a closed system that will not allow the water to flow as he fears. Mr. Lott similarly does not trust the City to comply with and the District to enforce the conditions of the ERP. Petitioners, James E. and Alicia M. Peake, who were represented by Steven L. Spratt at hearing as their qualified representative, live on Lake Louise, which is interconnected with the Lake Theresa basin. The Peakes are concerned that if the level of Lake Louise drops below 21 feet, nine inches, they will not be able to use the boat launch ramps on the lake. Petitioner, Steven L. Spratt, also lives on Lake Louise, and is concerned about the water levels becoming so low that he cannot use the boat launch on the lake. He has lived on the lake since 2000, and remembers when the water level was extremely low. He fears that approval of the ERP in this case will result in low levels of water once again. Petitioner, Gloria Benoit, has live on Lake Theresa for two years. She also enjoys watching recreational activities on the lake, and feels that approval of the ERP will devalue her lakefront property. Ms. Benoit appeared at the first day of the hearing, but offered no testimony on her behalf. J. Christy Wilson, Esquire, appeared prior to the final hearing as counsel of record for Petitioners, Steven E. Larimer, Kathleen Larimer, and Helen Rose Farrow. Neither Ms. Wilson nor any of the three Petitioners she represented appeared at any time during the hearing, filed any pleadings seeking to excuse themselves from appearing at the final hearing, or offered any evidence, testimony, pre- or post- hearing submittals. Petitioner, Gary Jensen, did not appear at hearing, did not file any pleadings or papers seeking to be excused from appearing at the final hearing, and did not offer any evidence, testimony, pre- or post-hearing submittals. Both the City and the District recognize that areas downstream from the project site, such as Stone Island and Sanford, have experienced flooding in the past in time of high amounts of rainfall. The system proposed by the City for this ERP will operate with the overflow structures closed and a brick and mortar plug in the outfall pipe to prevent water flow from Lake Doyle to Lake Bethel. So long as the overflow structures are closed, the system will mimic pre-construction flow patterns, with no increase in volume flowing downstream. The District has considered the environment in its proposed approval of the ERP. The area abutting the project is little urbanized and provides good aquatic and emergent marsh habitat. With the exception of the western shore area of the deepwater marsh ("west marsh area"), the bay swamp and remaining deepwater marsh area have good ecological value. In the 1940's, the west marsh area was incorporated into the drainage system of a poultry farm that occupied the site. This area apparently suffered increased nutrient influxes and sedimentation that contributed to a proliferation of floating mats of aquatic plants and organic debris. These tussocks reduced the deepwater marsh's open water and diminished the historical marsh habitat. Water under the tussocks is typically anoxic owing to total shading by tussocks and reduced water circulation. Thick, soft, anaerobic muck has accumulated under the matted vegetation. Exotic shrubs (primrose willow Ludwigia peruvania) and other plants (cattails Typha spp.) dominate the tussocks. The construction of the project, from the 2003 Emergency Order, resulted in adverse impacts to 1.3 acres of wetlands having moderately high- to high ecological value and 0.2 acres of other surface waters. The 0.2 acre impact to other surface waters was to the lake bottom and the shoreline of Lake Doyle where the weir structure was installed. The 0.3 acres of wetland impacts occurred at the upper end of the deepwater marsh where the pipe was installed. The largest wetland impact (1.0 acre) was to the bay swamp. The bay swamp is a shallow body dominated by low hummocks and pools connected inefficiently by shallow braided channels and one acre is filled with a 1-2 foot layer of sediment following swamp channelization. Disturbance plants (e.g., primrose willow, Ludwigia peruvania, and elderberry Sambucus Canadensis) now colonize the sediment plume. Pursuant to the District's elimination and reduction criteria, the applicant must implement practicable design modifications, which would reduce or eliminate adverse impacts to wetlands and other surface waters. A proposed modification, which is not technically capable of being done, is not economically viable, or which adversely affects public safety through endangerment of lives or property is not considered "practicable." The City reduced and/or eliminated the impacts to the lake bottom and shoreline of Lake Doyle and deepwater marsh, to the extent practicable. The impacts were the minimum necessary to install the weir structure and pipe for the system; the weir structure and pipe were carefully installed on the edges of the wetland and surface water systems, resulting in a minimum amount of grading and disturbance. To compensate for the loss of 1.3 acres of wetlands and 0.2 acres of other surface waters, the City proposes to preserve a total of 27.5 acres of wetlands, bay swamp, marsh, and contiguous uplands. Included in this 27.5 acres are 6.4 acres of the west marsh, which are to be restored. The parties stipulated that the mitigation plan would adequately compensate for losses of ecological function (e.g. wildlife habitat and biodiversity, etc.) resulting from the project. Water quality is a concern for the District. Lake Monroe is included on the Florida Department of Environmental Protection's verified list of impaired water bodies for nitrogen, phosphorous, and dissolved oxygen. Water quality data for Lake Monroe indicate the lake has experienced high levels of nitrogen and phosphorous and low levels of dissolved oxygen. Prior to construction of the project, there was no natural outfall from the Lake Theresa Basin to Lake Monroe and therefore no contribution from this basin to nitrogen and phosphorous loadings to Lake Monroe. Lake Colby, Three Island Lakes (a/k/a Lake Sixma), and the Savannah are surface waters within the Lake Theresa Basin for which minimum levels have been adopted pursuant to Florida Administrative Code Chapter 40C-8. The system will operate with the overflow structures closed and a brick and mortar plug in the outfall pipe to prevent water flow from Lake Doyle to Lake Bethel, resulting in no outfall from the Theresa Basin to Lake Monroe. Minimum flows established for surface waters within the Lake Theresa Basin will not be adversely impacted. Under the first part of the secondary impact test, the City must provide reasonable assurance that the secondary impacts from construction, alteration, and intended or reasonable expected use of the project will not adversely affect the functions of adjacent wetlands or surface waters. The system is designed as a low intensity project. As proposed, little activity and maintenance are expected in the project site area. The reasonably expected use of the system will not cause adverse impacts to the functions of the wetlands and other surface waters. None of the wetland areas adjacent to uplands are used by listed species for nesting or denning. In its pre-construction state, the project area did not cause or contribute to state water quality violations. Under the second part of the secondary impact test, the City must provide reasonable assurance that the construction, alteration, and intended or reasonably expected uses of the system will not adversely affect the ecological value of the uplands to aquatic or wetland dependent species for enabling existing nesting or denning by these species. There are no listed threatened or endangered species within the project site area. Under the third part of the secondary impact test, and as part of the public interest test, the District must consider any other relevant activities that are closely linked and causally related to any proposed dredging or filling which will cause impacts to significant historical and archaeological resources. When making this determination, the District is required, by rule, to consult with the Division of Historical Resources. The Division of Historical Resources indicated that no historical or archaeological resources are likely present on the site. No impacts to significant historical and archaeological resources are expected. Under the fourth part of the secondary impact test, the City must demonstrate that certain additional activities and future phases of a project will not result in adverse impacts to the functions of wetlands or water quality violations. The City has submitted to the District preliminary plans for a future phase in which the system would be modified for the purpose of alleviating high water levels within the Lake Theresa Basin when the level in Lake Doyle rises above an elevation of 24.5 feet. Based upon the plans and calculations submitted, the proposed future phase, without additional measures, could result in minor increases in the loadings of nitrogen and phosphorous to Lake Monroe. Lake Monroe is included on the Florida Department of Environmental Protection's verified list of impaired water bodies due to water quality data indicating the lake has experienced high levels of nitrogen and phosphorous, and low levels of dissolved oxygen. Under this potential future phase, there would be an outfall from the Lake Theresa Basin to Lake Monroe. To address the impact on water quality of this potential future phase, the City has submitted a loading reduction plan for nitrogen, phosphorous, and dissolved oxygen. The plan includes compensating treatment to fully offset the potential increased nutrient loadings to Lake Monroe. Specifically, the loading reduction plan includes: Construction and operation of compensating treatment systems to fully offset anticipated increased nutrient loadings to Lake Monroe. Weekly water quality monitoring of the discharge from Lake Doyle for total phosphorous and total nitrogen. A requirement that the overflow structure be closed if the total phosphorous level reaches 0.18 mg/l or higher or the total nitrogen level reaches 1.2 mg/l or higher in any given week and will remain closed until levels fall below those limits. The implementation of these water quality mitigation measures will result in a net improvement of the water quality in Lake Monroe for nitrogen, phosphorous, or dissolved oxygen. The future phase was conceptually evaluated by the District for impacts to wetland functions. The future phase as proposed could result in adverse impacts to wetland functions. Operation of the system with the overflow structures open could impact the bay swamp and deepwater marsh. The City has demonstrated that any adverse impacts could be offset through mitigation. Based upon the information provided by the City and general engineering principles, the system is capable of functioning as proposed. The City of Deltona will be responsible for the operation, maintenance, and repair of the surface waster management system. A local government is an acceptable operation and maintenance entity under District rules. The public interest test has seven criteria. The public interest test requires the District to evaluate only those parts of the project actually located in, on, or over surface waters or wetlands, to determine whether a factor is positive, neutral, or negative, and then to balance these factors against each other. The seven factors are as follows: the public health, safety, or welfare of others; conservation of fish and wildlife and their habitats; fishing, recreational value, and marine productivity; temporary or permanent nature; 5) navigation, water flow, erosion, and shoaling; 6) the current condition and relative value of functions; and 7) historical and archaeological resources. There are no identified environmental hazards or improvements to public health and safety. The District does not consider impacts to property values. To offset any adverse impacts to fish and wildlife and their habitats, the City has proposed mitigation. The areas of the project in, on, or over wetlands do not provide recreational opportunities. Construction and operation of the project located in, on, or over wetlands will be permanent in nature. Construction and operation of the project located in, on, or over wetlands will not cause shoaling, and does not provide navigational opportunities. The mitigation will offset the relative value of functions performed by areas affected by the proposed project. No historical or archaeological resources are likely on the site of the project. The mitigation of the project is located within the same drainage basin as the project and offsets the adverse impacts. The project is not expected to cause unacceptable cumulative impacts.

Recommendation Based upon the Findings of Fact and Conclusions of Law, it is RECOMMENDED that a Final Order be entered granting the City of Deltona's application for an environmental resource permit with the conditions set forth in the Technical Staff Report, and dismissing the Petitions for Formal Administrative Hearing filed by Gary Jensen in Case No. 04-2405, and by Steven E. Larimer, Kathleen Larimer, and Helen Rose Farrow in Case No. 04-3048. DONE AND ENTERED this 27th day of May, 2005, in Tallahassee, Leon County, Florida. S ROBERT S. COHEN Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 27th day of May, 2005. COPIES FURNISHED: George Trovato, Esquire City of Deltona 2345 Providence Boulevard Deltona, Florida 32725 Diana E. Bauer 1324 Tartan Avenue Deltona, Florida 32738 Barbara Ash, Qualified Representative 943 South Dean Circle Deltona, Florida 32738-6801 Phillip Lott 948 North Watt Circle Deltona, Florida Howard Ehmer Nina Ehmer 32738-7919 1081 Anza Court Deltona, Florida 32738 Francell Frei 1080 Peak Circle Deltona, Florida 32738 Bernard T. Patterson Virginia T. Patterson 2518 Sheffield Drive Deltona, Florida 32738 Kealey A. West, Esquire St. Johns River Water Management District 4049 Reid Street Palatka, Florida 32177 J. Christy Wilson, Esquire Wilson, Garber & Small, P.A. 437 North Magnolia Avenue Orlando, Florida 32801 Gloria Benoit 1300 Tartan Avenue Deltona, Florida 32738 Gary Jensen 1298 Tartan Avenue Deltona, Florida 32738 James E. Peake Alicia M. Peake 2442 Weatherford Drive Deltona, Florida 32738 Steven L. Spratt 2492 Weatherford Drive Deltona, Florida 32738 Ted Sullivan 1489 Timbercrest Drive Deltona, Florida 32738 Kirby Green, Executive Director St. Johns River Water Management District 4049 Reid Street Palatka, Florida 32177

Florida Laws (3) 120.569120.57373.086 Florida Administrative Code (6) 40C-4.30140C-4.30240C-4.33140C-4.75162-302.30062-4.242
# 8
DEPARTMENT OF COMMUNITY AFFAIRS vs MORTIMER AND GAY HALL, PIERCE CONSTRUCTION AND BUILDERS, AND MONROE COUNTY, 92-002958DRI (1992)
Division of Administrative Hearings, Florida Filed:Key West, Florida May 14, 1992 Number: 92-002958DRI Latest Update: Jun. 06, 1996

Findings Of Fact Petitioner is the state land planning agency charged with the responsibility to administer the provisions of Chapter 380, Florida Statutes, and the regulations promulgated thereunder. Petitioner has the authority to appeal to the Florida Land and Water Adjudicatory Commission any development order issued in an area of critical state concern. The appeal in the instant proceeding was timely. Monroe County is a political subdivision of the State of Florida and is responsible for issuing development orders for development in unincorporated Monroe County. Monroe County issued the development order that is the subject of this appeal. Respondents, Mortimer and Gay Hall, are the owners of real property known as Lots 60 and 61, Block 19, Breeze Swept Beach Estates on Ramrod Key in unincorporated Monroe County. The Halls have constructed a single family dwelling on that property, but the building permit for the construction of the dwelling is not at issue in this proceeding. Most of Monroe County, including the subject property, is within the Florida Keys Area of Critical State Concern as designated under Sections 380.05 and 380.0552, Florida Statutes. On January 21, 1992, Monroe County issued the subject building permit, Permit Number 9010001679, to Mortimer and Gay Hall as owners and Pierce Construction and Builders as contractor. The subject permit would be subject to certain conditions imposed by the Florida Department of Natural Resources (DNR). As permitted, the use of the structure would be limited to swimming and recreation. Boating, or the mooring of boats, would not be permitted. By letter dated December 17, 1991, DNR authorized the project subject to certain conditions and limitations, and provided, in pertinent part, as follows: Mort and Gay Hall are hereby authorized to proceed with the construction of a swim platform as proposed This authorization is specifically conditioned upon the following: * * * The structure shall be used only for passive recreational activities such as swimming and fishing. Mooring of vessels at the facility either on a temporary or permanent basis is strictly prohibited. The platform and walkway shall be elevated four feet above mhw [mean high water]. Handrails at a height of four feet shall be installed along the walkway and around the platform. Handrails shall be two feet above the platform deck. Install at least three "NO MOORING" signs along the perimeter of the platform. Install a ladder on the waterward terminus of the platform for water access. The application submitted by the Halls to Monroe County that resulted in the subject permit incorporated the DNR conditions and described the project as follows: Applicant wishes to install a wooden swim platform (20 ft. length x 8 ft. width) and a wooden elevated access walkway (25 ft. length x 4 ft. width) to access this platform; for the purpose of using the channel cut for swimming activities at their existing single family residence. Monroe County's comprehensive plan, which has been approved by the Petitioner and by the Administration Commission, is implemented through its adopted land development regulations, codified in Chapter 9.5, Monroe County Code. Section 9.5-345(m)(2), Monroe County Code, referred to as the four foot rule, provides as follows: (2) All structures on any submerged lands and mangroves shall be designed, located and constructed such that: * * * No structure shall be located on submerged land which is vegetated with sea grasses except as is necessary to reach waters at least four (4) feet below mean low level for docking facilities; No docking facility shall be developed at any site unless a minimum channel of twenty (20) feet in width where a mean low water depth of at least minus four (4) feet exists; Section 2.104, Nearshore Waters, Monroe County Comprehensive Plan, Volume II, Future Land Use Element, provides, in pertinent part, as follows: The Florida Keys are dependent on nearshore water quality for their environmental and economic integrity. The heart of the Florida Keys economy, the means by which Monroe County exists as a civil and social institution, is based on its unique oceanic character. If nearshore water quality is not maintained, then quality of life and the economy of Monroe County will be directly and immediately impacted. OBJECTIVES 1. To protect, maintain and, where appropriate, to improve the quality of nearshore waters in Monroe County. * * * POLICIES 1. To prohibit land use that directly or indirectly degrade nearshore water quality. * * * To prohibit the development of water dependent facilities, including marinas, at locations that would involve significant degradation of the biological character of submerged lands. To limit the location of water-dependent facilities at locations that will not have a significant adverse impact on off-shore resources of particular importance. For the purposes of this policy, off-shore resources of particular importance shall mean hard coral bottoms, habitat of state or federal threatened and endangered species, shallow water areas with natural marine communities with depths at mean low tide of less than four (4) feet, and all designated aquatic preserves under Florida Statutes section 258.39 et seq. By Final Judgment entered June 7, 1991, the Honorable Richard G. Payne, Judge of the Circuit Court of the Sixteenth Judicial Circuit, in and for Monroe County, Florida, ruled in Stanton v. Monroe County, Case No. 91-20-035- CA-18, that Monroe County's four foot rule does not apply to swimming piers, concluding, in pertinent part, as follows at page five of the Final Judgment: 5. To the extent that the County's Comprehensive Plan and Land Development Regulations fail to provide for swimming piers ... the court finds that it is unreasonable to treat such piers as if they were docks at which boats are to be moored. Pursuant to the judicial review authority of Chapter 163, Fla. Stat., the court declares ... [the four foot rule] inapplicable to piers at which boats are not to be moored. The County has adequate judicial remedies, including injunction, to prevent the use of such piers, including the subject pier, for the mooring of boats. Despite the Stanton ruling, supra, Monroe County has interpreted the four foot rule as being applicable to swimming piers such as the one the Halls wish to construct. Monroe County's long-standing interpretation of the four foot rule would not prohibit the permit because of the minimal effect such construction would have on the nearshore waters. Since 1986, Monroe County has adopted an interpretation of Section 9.5-345(m)(2), Monroe County Code, and of Section 2.104, Nearshore Waters, Monroe County Comprehensive Plan, Volume II, Future Land Use Element, that would permit the construction of the subject project. That interpretation permits the development of docks in subdivisions that were under development in 1986 if there is at least four feet of water at the terminal point of the dock at mean low tide. The structure that is the subject of this proceeding is in a subdivision that was under development prior to 1986 and would, if permitted, terminate in a channel more than 20 feet wide with water at least six feet deep at mean low tide. Monroe County's interpretation of the four foot rule is that the rule was intended to restrict the development of boating access facilities in new, undeveloped subdivisions and to regulate proposed expansion of existing marinas and the development of new marinas. Monroe County considers the subject application by the Halls to meet all of its permitting criteria. The structure will be constructed in a dredged area of adequate size for swimming. Access to the structure by boat is unlikely because the swimming area is surrounded by a reef and hard bottom that is extremely shallow, even at high tide. At low tide much of this surrounding area is above water, and the deepest area of water is approximately six inches. At high tide, the water depth of the surrounding area ranges from approximately four inches to approximately eighteen inches. On the waterward side of the surrounding area, the water depths are less than four feet. Petitioner's concern is that boats will moor at the structure regardless of the restrictions on the permit and that these boats will cause degradation to the nearshore waters while crossing to deep water. Benthic communities exist in the waters between the Halls's property and deep water, such as rock-hard bottom, sea grasses, algae, and hard coral. Turtles, manatees, sharks, stingrays, eagle rays, snapper, pink shrimp, mullet, and other marine animals populate those waters. Sea grass beds play an important role in water quality maintenance in the Keys through filtration, nutrient uptake, stabilization of the bottom, and as a habitat for commercially important species. One cannot reach deep water by boat from the Halls's property without crossing areas in which the water depth is less than four feet at low tide. Petitioner speculates that prop dredging, and the resulting damage to seagrass beds and shallow water marine communities, would result if one were to attempt to navigate these shallow waters by a propeller powered boat. Petitioner's concern is premised on the unwarranted assumptions that the structure will be illegally used at some point in the future by boats. Petitioner has failed to establish that this concern justifies denial of the permit. Petitioner did not establish that damage would be done to the environment by swimming in the area of the proposed swimming platform. Respondents presented evidence that several similar projects were permitted at approximately the same time as the Halls's permit without Petitioner filing an appeal. This evidence was insufficient to establish that Petitioner should be estopped to appeal the subject permit, that Petitioner engaged in selective enforcement of its regulatory power, or that Petitioner otherwise brought the subject appeal for an inappropriate purpose.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is recommended that the Florida Land and Water Adjudicatory Commission enter a final order affirming Monroe County's decision to issue building permit number 9010001679, and dismissing the appeal filed by the Department of Community Affairs. DONE AND ENTERED this 26th day of January, 1993, in Tallahassee, Leon County, Florida. CLAUDE B. ARRINGTON Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 26th day of January, 1993. APPENDIX TO RECOMMENDED ORDER, CASE NO. 92-2958DRI The following rulings are made on the proposed findings of fact submitted on behalf of Petitioner. The proposed findings of fact in paragraphs 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, and 14 are adopted in material part by the Recommended Order. The proposed findings of fact in the first sentence of paragraph 11, 12, 13, and 16 are subordinate to the findings made. The proposed findings of fact in paragraph 15 are rejected as being unnecessary to the conclusions reached because the use of the platform is limited. The testimony by Robert L. Herman as to the purpose and interpretation of the four foot rule by Monroe County is found to be a more persuasive than Mr. Metcalf's testimony. The following rulings are made on the proposed findings of fact submitted on behalf of Respondents. The proposed findings of fact in paragraphs 1, 2, 3,4, and 8 are adopted in material part by the Recommended Order. The proposed findings of fact in paragraphs 5 and 6 are rejected as being subordinate to the findings made. The proposed findings of fact in paragraph 8 are rejected as being unnecessary to the conclusions reached. COPIES FURNISHED: Lucky T. Osho, Esquire David Jordan, Esquire Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100 Theodore W. Herzog, Esquire Theodore W. Herzog, P.A. 209 Duval Street Key West, Florida 33040 Linda Loomis Shelley, Secretary Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100 G. Steven Pfeiffer, General Counsel Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100 James T. Hendrick, Esquire Attorney for Monroe County Post Office Box 1117 Key West, Florida 33040 Carolyn Dekle, Director South Florida Regional Planning Council 3400 Hollywood Boulevard Suite 140 Hollywood, Florida 33021 Pierce Construction and Builders Route 4, Box 319 Summerland Key, Florida 33042 Bob Herman, Herb Rabin, Lorenzo Aghemo, Pat McNeese Monroe County Growth Management Division Public Service Building, Wing III 5100 Junior College Road West Stock Island Key West, Florida 33040 William R. Kynoch, Deputy Director Florida Land and Water Adj. Commission Executive Officer of the Governor 311 Carlton Building Tallahassee, Florida 32301

Florida Laws (7) 120.57120.68258.39380.05380.0552380.07380.08
# 9
HOWARD EHMER AND NINA EHMER vs CITY OF DELTONA AND ST. JOHNS RIVER WATER MANAGEMENT DISTRICT, 04-002403 (2004)
Division of Administrative Hearings, Florida Filed:Deltona, Florida Jul. 12, 2004 Number: 04-002403 Latest Update: Jul. 25, 2005

The Issue The issue is whether the applicant for an Environmental Resource Permit ("ERP"), the City of Deltona ("City" or "Applicant"), has provided reasonable assurance that the system proposed complies with the water quantity, environmental, and water quality criteria of the St. Johns River Water Management District's ("District") ERP regulations set forth in Florida Administrative Code Chapter 40C-4, and the Applicant's Handbook: Management and Storage of Surface Waters (2005).

Findings Of Fact The District is a special taxing district created by Chapter 373, Florida Statutes, charged with the duty to prevent harm to the water resources of the District, and to administer and enforce Chapter 373, Florida Statutes, and the rules promulgated thereunder. The City of Deltona is a municipal government established under the provisions of Chapter 165, Florida Statutes. The Lake Theresa Basin is comprised primarily of a system of interconnected lakes extending from Lake Macy in the City of Lake Helen to the Butler Chain of Lakes (Lake Butler and Lake Doyle). The Lake Theresa Basin is land-locked and does not have a natural outfall to Lake Monroe and the St. Johns River. In 2003, after an extended period of above-normal rainfall in the Deltona area, the lakes within the land-locked Lake Theresa Basin staged to extremely high elevations that resulted in standing water in residential yards, and rendered some septic systems inoperable. Lake levels within the Lake Theresa Basin continued to rise and were in danger of rising above the finished floor elevations of some residences within the basin. On March 25, 2003, the District issued an Emergency Order (F.O.R. No. 2003-38) authorizing the construction and short-term operation of the Lake Doyle and Lake Bethel Emergency Overflow Interconnection. Since wetland and surface water impacts would occur, the Emergency Order required the City of Deltona to obtain an ERP for the system. The project area is 4.1 acres, and the system consists of a variable water structure on the west shore of Lake Doyle connected to a series of pipes, swales, water control structures, and wetland systems which outfall to a finger canal of Lake Bethel, with ultimate discharge to Lake Monroe and the St. Johns River. The first segment of the system extends downstream from the weir structure on the west shore of Lake Doyle via a pipe entrenched in the upland berm of the Sheryl Drive right-of-way. The pipe passes under Doyle Road and through xeric pine-oak uplands to the northeast shore of a large (approximately 15 acres) deepwater marsh. Water flows south through the deepwater marsh where it outfalls through four pipes at Ledford Drive. Two of the four pipes are overflow structures, controlled by canal gates. The pipes at Ledford Drive discharge into a ditch and into a large (greater than 20 acres) shallow bay swamp. The south end of the bay swamp is defined (and somewhat impounded) by a 19th Century railroad grade. Water flows through the bay swamp where it outfalls through five pipes at the railroad grade. Three of the five pipes are overflow structures, controlled by channel boards. The pipes at the railroad grade discharge to a 1500-foot long finger canal that was dug some time during the period 1940-1972 from the north central shore of Lake Bethel. The overflow interconnection system has three locations whereby the system can be shut down: 1) Lake Doyle--a control weir, controlled by three sluice gates; 2) Ledford Drive--two thirty-inch reinforced concrete pipes, controlled by canal gates; and 3) railroad grade--three thirty-inch reinforced concrete pipes, controlled by channel boards (collectively referred to as "Overflow Structures"). The Overflow Structures are designed to carry the discharge of water from Lake Doyle to Lake Bethel. With the Overflow Structures closed the system returns to pre-construction characteristics, meaning there will be no increase or decrease in the quantity or quality of water throughout the path of the system as a result of the project. An unequivocal condition of the permit is that the system would operate with all of the Overflow Structures closed. As an added assurance, the City proposes to place a brick and mortar plug in the Lake Doyle weir structure outfall pipe to prevent any discharge from the weir. The City has submitted to the District preliminary plans for a future phase in which the system would be modified for the purpose of alleviating high water levels within the Lake Theresa Basin when the water level in Lake Doyle rises above an elevation of 24.5 feet. The District shall require a separate permit application to be submitted for such future plans. Petitioner, Barbara Ash, has lived on Lake Theresa for 19 years. Ms. Ash lives upstream from the area of the weir that will be plugged in accordance with the ERP. She does not trust either the City of Deltona to comply with or the District to enforce the conditions of the ERP applied for by the City. Petitioner, Barbara Ash, also served as the qualified representative for Petitioners, Francell Frei, Bernard J. and Virginia Patterson, and Ted and Carol Sullivan. Ms. Ash represented that Ms. Frei has lived on Lake Theresa for 12 years, and both the Pattersons and the Sullivans live on Lake Louise, which is within the area of concern in this proceeding. Petitioner, Diana Bauer, has lived on Lake Theresa since February 2004. She fears that the lake will become too dry if the system is allowed to flow. She also believes the wildlife will be adversely affected if the water levels are too low since many species need a swampy or wet environment to thrive. She fears her property value will decrease as a result of the approval of the ERP. She also does not trust either the City to comply with or the District to enforce the conditions of the ERP. Petitioner, Howard Ehmer, lives two to three hundred yards down Lake Theresa from Ms. Bauer. He is concerned about the lake bed being too dry and attracting people on all terrain vehicles who enjoy driving around the lake bottom. He is concerned about his property value decreasing if the lake bed is dry. Further, when the lake level is too low, people cannot enjoy water skiing, boating, and fishing on Lake Theresa. Petitioner, Phillip Lott, a Florida native, has also owned and lived on property abutting Lake Theresa since 1995. Mr. Lott has a Ph.D. in plant ecology, and M.P.A. in coastal zone studies, an M.B.A. in international business, and a B.S. in environmental resource management and planning. Mr. Lott has been well acquainted with the water levels on Lake Theresa for many years. Based upon his personal observations of the lake systems in the Deltona area over the years, Mr. Lott has seen levels fluctuate greatly based upon periods of heavy and light rainfall. Mr. Lott is concerned that the District will permit the City to open the weir to let water flow through the system and cause flooding in some areas and low water levels in other areas. He fears that the District will allow the water to flow and upset the environmental balance, but he admits that this ERP application is for a closed system that will not allow the water to flow as he fears. Mr. Lott similarly does not trust the City to comply with and the District to enforce the conditions of the ERP. Petitioners, James E. and Alicia M. Peake, who were represented by Steven L. Spratt at hearing as their qualified representative, live on Lake Louise, which is interconnected with the Lake Theresa basin. The Peakes are concerned that if the level of Lake Louise drops below 21 feet, nine inches, they will not be able to use the boat launch ramps on the lake. Petitioner, Steven L. Spratt, also lives on Lake Louise, and is concerned about the water levels becoming so low that he cannot use the boat launch on the lake. He has lived on the lake since 2000, and remembers when the water level was extremely low. He fears that approval of the ERP in this case will result in low levels of water once again. Petitioner, Gloria Benoit, has live on Lake Theresa for two years. She also enjoys watching recreational activities on the lake, and feels that approval of the ERP will devalue her lakefront property. Ms. Benoit appeared at the first day of the hearing, but offered no testimony on her behalf. J. Christy Wilson, Esquire, appeared prior to the final hearing as counsel of record for Petitioners, Steven E. Larimer, Kathleen Larimer, and Helen Rose Farrow. Neither Ms. Wilson nor any of the three Petitioners she represented appeared at any time during the hearing, filed any pleadings seeking to excuse themselves from appearing at the final hearing, or offered any evidence, testimony, pre- or post- hearing submittals. Petitioner, Gary Jensen, did not appear at hearing, did not file any pleadings or papers seeking to be excused from appearing at the final hearing, and did not offer any evidence, testimony, pre- or post-hearing submittals. Both the City and the District recognize that areas downstream from the project site, such as Stone Island and Sanford, have experienced flooding in the past in time of high amounts of rainfall. The system proposed by the City for this ERP will operate with the overflow structures closed and a brick and mortar plug in the outfall pipe to prevent water flow from Lake Doyle to Lake Bethel. So long as the overflow structures are closed, the system will mimic pre-construction flow patterns, with no increase in volume flowing downstream. The District has considered the environment in its proposed approval of the ERP. The area abutting the project is little urbanized and provides good aquatic and emergent marsh habitat. With the exception of the western shore area of the deepwater marsh ("west marsh area"), the bay swamp and remaining deepwater marsh area have good ecological value. In the 1940's, the west marsh area was incorporated into the drainage system of a poultry farm that occupied the site. This area apparently suffered increased nutrient influxes and sedimentation that contributed to a proliferation of floating mats of aquatic plants and organic debris. These tussocks reduced the deepwater marsh's open water and diminished the historical marsh habitat. Water under the tussocks is typically anoxic owing to total shading by tussocks and reduced water circulation. Thick, soft, anaerobic muck has accumulated under the matted vegetation. Exotic shrubs (primrose willow Ludwigia peruvania) and other plants (cattails Typha spp.) dominate the tussocks. The construction of the project, from the 2003 Emergency Order, resulted in adverse impacts to 1.3 acres of wetlands having moderately high- to high ecological value and 0.2 acres of other surface waters. The 0.2 acre impact to other surface waters was to the lake bottom and the shoreline of Lake Doyle where the weir structure was installed. The 0.3 acres of wetland impacts occurred at the upper end of the deepwater marsh where the pipe was installed. The largest wetland impact (1.0 acre) was to the bay swamp. The bay swamp is a shallow body dominated by low hummocks and pools connected inefficiently by shallow braided channels and one acre is filled with a 1-2 foot layer of sediment following swamp channelization. Disturbance plants (e.g., primrose willow, Ludwigia peruvania, and elderberry Sambucus Canadensis) now colonize the sediment plume. Pursuant to the District's elimination and reduction criteria, the applicant must implement practicable design modifications, which would reduce or eliminate adverse impacts to wetlands and other surface waters. A proposed modification, which is not technically capable of being done, is not economically viable, or which adversely affects public safety through endangerment of lives or property is not considered "practicable." The City reduced and/or eliminated the impacts to the lake bottom and shoreline of Lake Doyle and deepwater marsh, to the extent practicable. The impacts were the minimum necessary to install the weir structure and pipe for the system; the weir structure and pipe were carefully installed on the edges of the wetland and surface water systems, resulting in a minimum amount of grading and disturbance. To compensate for the loss of 1.3 acres of wetlands and 0.2 acres of other surface waters, the City proposes to preserve a total of 27.5 acres of wetlands, bay swamp, marsh, and contiguous uplands. Included in this 27.5 acres are 6.4 acres of the west marsh, which are to be restored. The parties stipulated that the mitigation plan would adequately compensate for losses of ecological function (e.g. wildlife habitat and biodiversity, etc.) resulting from the project. Water quality is a concern for the District. Lake Monroe is included on the Florida Department of Environmental Protection's verified list of impaired water bodies for nitrogen, phosphorous, and dissolved oxygen. Water quality data for Lake Monroe indicate the lake has experienced high levels of nitrogen and phosphorous and low levels of dissolved oxygen. Prior to construction of the project, there was no natural outfall from the Lake Theresa Basin to Lake Monroe and therefore no contribution from this basin to nitrogen and phosphorous loadings to Lake Monroe. Lake Colby, Three Island Lakes (a/k/a Lake Sixma), and the Savannah are surface waters within the Lake Theresa Basin for which minimum levels have been adopted pursuant to Florida Administrative Code Chapter 40C-8. The system will operate with the overflow structures closed and a brick and mortar plug in the outfall pipe to prevent water flow from Lake Doyle to Lake Bethel, resulting in no outfall from the Theresa Basin to Lake Monroe. Minimum flows established for surface waters within the Lake Theresa Basin will not be adversely impacted. Under the first part of the secondary impact test, the City must provide reasonable assurance that the secondary impacts from construction, alteration, and intended or reasonable expected use of the project will not adversely affect the functions of adjacent wetlands or surface waters. The system is designed as a low intensity project. As proposed, little activity and maintenance are expected in the project site area. The reasonably expected use of the system will not cause adverse impacts to the functions of the wetlands and other surface waters. None of the wetland areas adjacent to uplands are used by listed species for nesting or denning. In its pre-construction state, the project area did not cause or contribute to state water quality violations. Under the second part of the secondary impact test, the City must provide reasonable assurance that the construction, alteration, and intended or reasonably expected uses of the system will not adversely affect the ecological value of the uplands to aquatic or wetland dependent species for enabling existing nesting or denning by these species. There are no listed threatened or endangered species within the project site area. Under the third part of the secondary impact test, and as part of the public interest test, the District must consider any other relevant activities that are closely linked and causally related to any proposed dredging or filling which will cause impacts to significant historical and archaeological resources. When making this determination, the District is required, by rule, to consult with the Division of Historical Resources. The Division of Historical Resources indicated that no historical or archaeological resources are likely present on the site. No impacts to significant historical and archaeological resources are expected. Under the fourth part of the secondary impact test, the City must demonstrate that certain additional activities and future phases of a project will not result in adverse impacts to the functions of wetlands or water quality violations. The City has submitted to the District preliminary plans for a future phase in which the system would be modified for the purpose of alleviating high water levels within the Lake Theresa Basin when the level in Lake Doyle rises above an elevation of 24.5 feet. Based upon the plans and calculations submitted, the proposed future phase, without additional measures, could result in minor increases in the loadings of nitrogen and phosphorous to Lake Monroe. Lake Monroe is included on the Florida Department of Environmental Protection's verified list of impaired water bodies due to water quality data indicating the lake has experienced high levels of nitrogen and phosphorous, and low levels of dissolved oxygen. Under this potential future phase, there would be an outfall from the Lake Theresa Basin to Lake Monroe. To address the impact on water quality of this potential future phase, the City has submitted a loading reduction plan for nitrogen, phosphorous, and dissolved oxygen. The plan includes compensating treatment to fully offset the potential increased nutrient loadings to Lake Monroe. Specifically, the loading reduction plan includes: Construction and operation of compensating treatment systems to fully offset anticipated increased nutrient loadings to Lake Monroe. Weekly water quality monitoring of the discharge from Lake Doyle for total phosphorous and total nitrogen. A requirement that the overflow structure be closed if the total phosphorous level reaches 0.18 mg/l or higher or the total nitrogen level reaches 1.2 mg/l or higher in any given week and will remain closed until levels fall below those limits. The implementation of these water quality mitigation measures will result in a net improvement of the water quality in Lake Monroe for nitrogen, phosphorous, or dissolved oxygen. The future phase was conceptually evaluated by the District for impacts to wetland functions. The future phase as proposed could result in adverse impacts to wetland functions. Operation of the system with the overflow structures open could impact the bay swamp and deepwater marsh. The City has demonstrated that any adverse impacts could be offset through mitigation. Based upon the information provided by the City and general engineering principles, the system is capable of functioning as proposed. The City of Deltona will be responsible for the operation, maintenance, and repair of the surface waster management system. A local government is an acceptable operation and maintenance entity under District rules. The public interest test has seven criteria. The public interest test requires the District to evaluate only those parts of the project actually located in, on, or over surface waters or wetlands, to determine whether a factor is positive, neutral, or negative, and then to balance these factors against each other. The seven factors are as follows: the public health, safety, or welfare of others; conservation of fish and wildlife and their habitats; fishing, recreational value, and marine productivity; temporary or permanent nature; 5) navigation, water flow, erosion, and shoaling; 6) the current condition and relative value of functions; and 7) historical and archaeological resources. There are no identified environmental hazards or improvements to public health and safety. The District does not consider impacts to property values. To offset any adverse impacts to fish and wildlife and their habitats, the City has proposed mitigation. The areas of the project in, on, or over wetlands do not provide recreational opportunities. Construction and operation of the project located in, on, or over wetlands will be permanent in nature. Construction and operation of the project located in, on, or over wetlands will not cause shoaling, and does not provide navigational opportunities. The mitigation will offset the relative value of functions performed by areas affected by the proposed project. No historical or archaeological resources are likely on the site of the project. The mitigation of the project is located within the same drainage basin as the project and offsets the adverse impacts. The project is not expected to cause unacceptable cumulative impacts.

Recommendation Based upon the Findings of Fact and Conclusions of Law, it is RECOMMENDED that a Final Order be entered granting the City of Deltona's application for an environmental resource permit with the conditions set forth in the Technical Staff Report, and dismissing the Petitions for Formal Administrative Hearing filed by Gary Jensen in Case No. 04-2405, and by Steven E. Larimer, Kathleen Larimer, and Helen Rose Farrow in Case No. 04-3048. DONE AND ENTERED this 27th day of May, 2005, in Tallahassee, Leon County, Florida. S ROBERT S. COHEN Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 27th day of May, 2005. COPIES FURNISHED: George Trovato, Esquire City of Deltona 2345 Providence Boulevard Deltona, Florida 32725 Diana E. Bauer 1324 Tartan Avenue Deltona, Florida 32738 Barbara Ash, Qualified Representative 943 South Dean Circle Deltona, Florida 32738-6801 Phillip Lott 948 North Watt Circle Deltona, Florida Howard Ehmer Nina Ehmer 32738-7919 1081 Anza Court Deltona, Florida 32738 Francell Frei 1080 Peak Circle Deltona, Florida 32738 Bernard T. Patterson Virginia T. Patterson 2518 Sheffield Drive Deltona, Florida 32738 Kealey A. West, Esquire St. Johns River Water Management District 4049 Reid Street Palatka, Florida 32177 J. Christy Wilson, Esquire Wilson, Garber & Small, P.A. 437 North Magnolia Avenue Orlando, Florida 32801 Gloria Benoit 1300 Tartan Avenue Deltona, Florida 32738 Gary Jensen 1298 Tartan Avenue Deltona, Florida 32738 James E. Peake Alicia M. Peake 2442 Weatherford Drive Deltona, Florida 32738 Steven L. Spratt 2492 Weatherford Drive Deltona, Florida 32738 Ted Sullivan 1489 Timbercrest Drive Deltona, Florida 32738 Kirby Green, Executive Director St. Johns River Water Management District 4049 Reid Street Palatka, Florida 32177

Florida Laws (3) 120.569120.57373.086 Florida Administrative Code (6) 40C-4.30140C-4.30240C-4.33140C-4.75162-302.30062-4.242