WILLIAM AND MARLENE GRUBB vs DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION, CONSTRUCTION INDUSTRY LICENSING BOARD AND NORMAN LEVINSKY, 04-003047 (2004)
Division of Administrative Hearings, Florida Filed:Fort Lauderdale, Florida Aug. 30, 2004 Number: 04-003047 Latest Update: Nov. 07, 2019

The Issue Whether Petitioners' claim for monies from the Florida Homeowners' Construction Recovery Fund is subject to adjudication pursuant to Section 120.57(1), Florida Statutes, and, if so, how much should Petitioners be awarded.

Findings Of Fact Based on the evidence adduced at hearing, and the record as a whole, the following findings of fact are made: On or about October 1, 1997, Petitioners entered into a contract in which they agreed to pay Respondent Norman Levinsky's company, Broward Roofing, Inc., $3,700.00 to place a "new shingle roof" on Petitioners' residence and perform other related roofing work. The contract provided Petitioners with a ten-year "labor warranty" and a 30-year shingle warranty. After the contracted work was completed and Petitioners paid Broward Roofing, Inc., the $3,700.00 called for by the contract, the newly-installed roof started leaking. Broward Roofing, Inc., refused to make the necessary repairs. Petitioners paid other contractors to perform the repair work. On November 17, 1998, Petitioner filed an application seeking to recover from the Florida Construction Industries Recovery Fund (which has since been renamed the Florida Homeowners' Construction Recovery Fund) $1,025.00 that they had paid for repairs to the "new shingle roof" Broward Roofing, Inc., had recently installed, contending that they were deserving of such an award inasmuch as "[t]he roofer [Broward Roofing, Inc.] [had] refused to fix [their] new roof that was leaking and [had] totally ignored [their] 10 year warranty." Their application was filed on a Board-produced Construction Industries Recovery Fund Claim Form (Form), at the end of which was printed the following: In addition to your complete written statement, we are requesting documentation of your contractual relationship with the contractor and evidence supporting your claim. Certified copies of the following list of documents are required to assist us in determining your eligibility for recovery. I have attached the following: (these documents are required for proper processing of your claim. Failure to provide required documentation will delay processing and could result in your claim being denied due to incompleteness.) Court certified copy of the Civil Judgment, and/or Final Order of the Construction Industry Licensing Board directing restitution be paid. Copy of contract between you and the contractor. Copies of applicable bonds, sureties, guarantees, warranties, letters of credit and/or policies of insurance. Court certified copies of levy and execution documents. Proof of all efforts/inability to collect restitution judgment. No claims will be processed until 45 days after the date of entry of the Civil Judgment and/or Final Restitution Order. On the completed Form that Petitioners filed, only the spaces next to "Copy of contract between you and the contractor" and "Copies of applicable bonds, sureties, guarantees, warranties, letters of credit and/or policies of insurance" were checked. On May 4, 1999, the Broward County Central Examining Board of Construction Trades filed an Administrative Complaint against "Norman Levinsky d/b/a Broward Roofing, Inc.," which read as follows: Count I At all times material hereto RESPONDENT was a roofing contractor holding Broward County Certificate of Competency #95-7726-R- R. On or about September 16, 1997, RESPONDENT entered into a contract to re- roof Complainant's home located at 10551 N.W. 21st Court, Sunrise, Florida. RESPONDENT obtained a building permit. The work was completed on March 10, 1998 and the roof began to leak on June 1, 1998. RESPONDENT failed to properly supervise to ensure that the tie in with flat roof was properly completed. His failure to ensure such a proper tie in resulted in leaks. Wherefore, it is charged that the RESPONDENT violated Subsection 9-14(b)(11) of the Broward County Code of Ordinances by failing to properly supervise a project commenced pursuant to a building permit. Count II Paragraphs 1 and 2 are included as if restated herein. Complainant paid RESPONDENT the total contract price of $3,700.00. RESPONDENT completed the work. RESPONDENT gave Complainant a 10 year labor warranty. RESPONDENT failed and refused to honor his warranty. Complainant had to pay additional amount of $1,025.00 for a new contractor to repair the work of RESPONDENT. Wherefore, it is charged that the RESPONDENT violated Subsection 9-14(b)(5)c of the Broward County Code of Ordinances by committing mismanagement which causes financial harm to a customer because the customer had to pay more for the contracted job than the original contract price. Count III Above paragraphs are included as if restated herein. RESPONDENT failed to honor the warranty and complete the project in a workmanlike manner for a period in excess of 90 consecutive days. Wherefore, it is charged that the RESPONDENT violated Subsection 9-14(b)(8) of the Broward County Code of Ordinances by abandoning a construction project in which RESPONDENT was under contract as a contractor. It is determined that the above stated charges are grounds for disciplinary action pursuant to Chapter 9, Sections 9-14, 9-28 and 9-46, Broward County Code of Ordinances and Section 6.11, Broward County Charter. Broward County has the authority to certify and discipline local contractors pursuant to Section 489.131, Florida Statutes. Following a hearing on the Administrative Complaint held May 25, 1999, the Broward County Central Examining Board of Building Construction Trades, on June 16, 1999, issued an Order, which read as follows: A Disciplinary Proceeding was held on May 25, 1999, before the Broward County Central Examining Board of Building Construction Trades (the "Board"), in accordance with Section 9-14, Broward County Code of Ordinances (the "Code"). Service of the Administrative Complaint filed against the Respondent was made by certified mail. The Respondent being duly advised was not present at the hearing. The Board heard the sworn testimony of William Grubb and Marlene Grubb. Upon consideration, it is ORDERED: The allegations of fact as set forth in the Administrative Complaint are found to be true and adopted and incorporated herein by reference as findings of fact. The conclusions of law alleged and set forth in the Administrative Complaint are approved and adopted and incorporated herein. Upon these findings, it is therefore ORDERED: That Respondent's Certificate of Competency is hereby revoked. That the Respondent make restitution to the Complainants in the amount of $3,700.00. Prior to the RESPONDENT being allowed to reinstate his certificate of competency or being allowed to sit for any exam administered by a Broward County Central Examining Board, or receiving any license from a Broward County Central Examining Board, RESPONDENT must appear before the Board and prove that the restitution amount has been paid in full. The board's order may be appealed by Petition for Writ of Certiorari to the Seventeenth Judicial Circuit within thirty (30) days of the date of rendition of the order of the board as provided by the Florida Rules of Appellate Procedure. FURTHER, the Broward County Central Examining Board of Construction Trades makes RECOMMENDATION to the Florida Construction Industry Licensing Board to impose on the state registration, the following penalty: 1. Revoke state registration and require the RESPONDENT to make restitution to the Complainants in the amount of $3,700.00. In accordance with Florida Statutes, Chapter 489.131(7)(c) and (d), the disciplined contractor, the complainant, or the Department of Business and Professional Regulation may challenge the local jurisdiction enforcement body's recommended penalty for Board action to the State Construction Industry Licensing Board. A challenge shall be filed within sixty (60) days of the issuance of the recommended penalty to the State Construction Industry Licensing Board in Jacksonville, Florida. If challenged, there is a presumptive finding of probable cause and the case may proceed before the State Board without the need for a probable cause hearing. Failure of the disciplined contractor, the complainant, or the Department of Business and Professional Regulation to challenge the local jurisdiction's recommended penalty within the time period set forth in this subsection shall constitute a waiver of the right to a hearing before the State Construction Industry Licensing Board. A waiver of the right to a hearing before the State Board shall be deemed an admission of the violation, and the penalty recommended shall become a final order according to procedures developed by State Board rule without further State Board action. Pursuant to Section 120.569, Florida Statutes, the Parties are hereby notified that they may appeal the Final Order of the State Board by filing one copy of a Notice of Appeal with the Clerk of the Department of Business and Professional Regulation, Northwood Centre, 1940 North Monroe Street, Tallahassee, Florida 32399-0792, and by filing the filing fee and one copy of the Notice of Appeal with the District Court of Appeal within thirty (30) days of the effective date of said Order. On or sometime after September 1, 1999, Petitioners filed an affidavit prepared by Petitioner Marlene Grubb, which read as follows: I, Marlene A. Grubb, hereby certify that I have completed a reasonable search and inquiry in accordance with the instructions provided by the Construction Industry Licensing Board and have not found property or assets to satisfy my Board Order[1] in whole or part. Legal Names The Department of State revealed that the company Broward Roofing Inc. was administratively dissolved on 9/10/98. The C[IL]B verified the contractor[']s name and license number as: Norman Levinsky d/b/a Broward Roofing Inc. RC0047656. Real Property My search included property in the names: Norman Levinsky and Broward Roofing Inc. in Broward County, Florida. Norman Levinsky had no real property and Broward Roofing Inc. is delinquent on property taxes for over two years. Boats and Motor Vehicles There were no vehicles or boats in the motor vehicle data bank registered to Norman Levinsky or Broward Roofing Inc. Aircraft The FAA in Oklahoma City, Ms. Jeannie Vannest stated that there is no registration listed for Norman Levinsky or Broward Roofing Inc. On March 25, 2004, the Board rendered a Final Order Approving Recommended Order of Disciplinary Action by Local Enforcement Body, which approved the Broward County Central Examining Board of Building Construction Trades' June 16, 1999, Order and read as follows: THIS MATTER came before the Construction Industry Licensing Board (hereinafter referred to as the "Board") pursuant to Section 489.131(7), Florida Statutes, for a determination of whether to accept the proposed recommended penalty by the Broward County Central Examining Board of Building Construction Trades (a copy of which is attached and incorporated herein by reference). Neither the Petitioner, the Respondent nor the Complainant filed a challenge to the local enforcement body's recommended penalty to the Board. Upon consideration of the local enforcement body's Administrative Complaint, the minutes from the meetings on January 21, 1999, and May 25, 1999, and the Final Order of Disciplinary Action and its proposed recommended penalty to the Board in this matter and being otherwise fully advised in the premises it is hereby ORDERED AND ADJUDGED: The proposed recommended penalty is hereby approved and adopted in its entirety and incorporated herein by reference. In accordance with the recommended penalty, Respondent's state registration (RC 0047656) is hereby REVOKED. Respondent shall pay restitution in the amount of $3,700 to William and Marlene Grubb. Respondent will adhere to and abide by all of the terms and conditions of the recommended penalty. Failure to abide by the terms of this Order may result in further action by the Board. This Order shall be placed in and become a part of Respondent's official records. A change in the Respondent's licensure status, including the suspension, revocation, voluntary relinquishment, or delinquency of license, does not relieve the Respondent of his obligation to pay any fines, costs, interest or restitution imposed in this and previous orders. Pursuant to Section 120.68, Florida Statutes, the Parties are hereby notified that they may appeal this Final Order by filing a Notice of Appeal with the Clerk of the Department of Business and Professional Regulation, Northwood Centre, 1940 North Monroe Street, Tallahassee, Florida 32399- 0792, and by filing the filing fee and one copy of the Notice of Appeal with the District Court of Appeal within thirty (30) days of the effective date of this Order. This Order shall become effective upon filing with the Clerk of Department of Business and Professional Regulation. This was the "Final Order of the Construction Industry Licensing Board directing restitution be paid," that, according to the Form Petitioners used to submit their claim for monies from the Florida Construction Industries Recovery Fund, was "required for proper processing of [their] claim." On June 10, 2004, more than five and a half years after Petitioners had filed their claim application, the Board met to determine the merits of their claim pursuant to Section 120.57(2), Florida Statutes. Although given due notice of the Board meeting, neither Petitioners, nor Mr. Levinsky, made an appearance, either in person or through a representative, at the meeting. "[U]pon consideration of the documentation and testimony submitted," the Board determined that Petitioners' claim for $1,025.00 should be "approved." On July 29, 2004, the Board rendered (that is, filed with the agency clerk) a written order to this effect, which read as follows: THIS MATTER came before the Construction Industries Recovery Fund Committee and Construction Industry Licensing Board (the "Board") pursuant to sections 120.57(2) and 489.143, Florida Statutes (2003) as well as rule 61G4-21.004, Florida Administrative Code, on June 10, 2004, in Coral Gables, Florida, for consideration of a claim for restitution from the Construction Industries Recovery Fund (the "Recovery Fund"). William [a]nd Marlene Grubb ("Claimants") and Norman Levinsky ("Licensee") were duly notified of the proceedings. At the proceedings before the committee and the Board, Claimants were not present, and were not represented by counsel. Licensee was not present, and was not represented by counsel. Upon consideration of the documentation and testimony submitted, it is ORDERED: Claimants satisfied all requirements for payment from the Recovery Fund. The Recovery Fund Claim was filed on November 17, 1998. The application was timely filed. The contractor was paid $3,700.00. Claimants were awarded restitution from the Construction Industry Licensing Board on March 24, 2004, in the amount of $3,700.00, pursuant to a Final Order Approving Recommended Order of Disciplinary Action by Local Enforcement Body. The Board adopted and approved the Broward County Central Examining Board of Building Construction Trades recommendation, which found: Contractor held a current and active license at all times material to the transaction; The construction contract is dated September 18, 1997; The work was completed on March 10, 1998, and the roof began leaking June 1, 1998; Contractor failed to honor the warranty on the roof; As a result, Claimants paid an additional $1,025.00 for repair work; Contractor violated subsection 9- 14(b)(5)c of the Broward County Ordinances by committing mismanagement, which caused financial harm to a consumer because the consumer had to pay more for the contractual job than the original contract price. The contractor engaged in activity that appears [to] violate section 489.129(1)(g)2, Florida Statutes (2003). There is an asset search in the file that shows no assets are available from which claimant can satisfy the judgment. Pursuant to section 489.143, Florida Statutes (2003), the maximum amount that the Recovery Fund can pay on a single claim is $25,000.00. Thus, the claim for restitution from the Recovery Fund is APPROVED in the amount of $1,025.00. In accordance with rule 61G4-21.005, Florida Administrative Code, the Secretary of the Florida Department of Business and Professional Regulation is directed to pay the claim from the Recovery Fund after forty-five days from the date upon which the Final Order is filed with the Agency Clerk. Pursuant to section 489.143(6), Florida Statutes (2003), upon payment of the claim from the Recovery Fund, Licensee's licensure to practice contracting is AUTOMATICALLY SUSPENDED without any further administrative action. Pursuant to section 489.143(2), Florida Statutes (2003), upon receipt by Claimant under section 489.143(1), Florida Statutes (2003) of payment from the Recovery Fund, Claimant shall assign his or her additional right, title, and interest in the judgment or restitution order, to the extent of such payment, to the Board, and thereupon the Board shall be subrogated to the right, title, and interest of the Claimant; and any amount subsequently recovered on the award, judgment or restitution order by the Board, to the extent of the right, title, and interest of the Board therein, shall be for the purpose of reimbursing the Recovery Fund. This Order shall become effective upon filing with the Clerk of the Department of Business and Professional Regulation. DONE AND ORDERED this 21st day of June, 2004. Appended to the order was the following Notice of Right of Appeal: You are hereby notified that mediation is not available in this matter. Pursuant to Section 120.569, Florida Statutes, you may seek review of the above by filing a request for hearing with the Executive Director of the Board at 1940 North Monroe Street, Tallahassee, Florida 32399-2202 within twenty-one (21) days of the filing of this Order. Upon request, you will receive an informal hearing pursuant to section 120.57(2), Florida Statutes. In the alternative, you may request a formal hearing pursuant to Section 120.57(1), Florida Statutes, if there are material facts in dispute; if you request a formal hearing, the petition must contain the information required by Rule 28-106.201, Florida Administrative Code, including specification of the facts which are in dispute. If you request a hearing, you have the right to be represented by an attorney or other qualified representative to take testimony. On August 12, 2004, Petitioners filed a Request for Hearing, complaining that they "should be awarded at least $3,475.00" to be adequately compensated for all of the repairs they had to make to their roof as a result of Broward Roofing, Inc.'s failure to meet its responsibilities. On August 30, 2004, the Board referred the matter to DOAH "for the assignment of an Administrative Law Judge to conduct a formal hearing" pursuant to Section 120.57(1), Florida Statutes.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is hereby RECOMMENDED that the Board issue an order dismissing Petitioners' Request for Hearing challenging the Board's order, rendered July 29, 2004, disposing of their claim for monies from the Fund, but allowing them, if they so desire, to request that that order be vacated and re-rendered so that they will have the opportunity to file a timely appeal in accordance with Section 120.68, Florida Statutes. DONE AND ENTERED this 28th day of December, 2004, in Tallahassee, Leon County, Florida. S __ STUART M. LERNER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 28th day of December, 2004.

Florida Laws (14) 120.569120.57120.68409.141455.275489.105489.129489.131489.140489.1401489.141489.142489.143713.35
# 1
CONSTRUCTION INDUSTRY LICENSING BOARD vs. NORMAN RIVERS, 77-000474 (1977)
Division of Administrative Hearings, Florida Number: 77-000474 Latest Update: Nov. 09, 1977

The Issue The basic allegations of the complaint having been proven or admitted, the sole question at hearing was one of mitigation.

Findings Of Fact Rivers is a licensed general and a licensed pool contractor. All the complaints against Rivers arose in relationship to his pool contracting activities. Rivers did begin construction of two pools in Levy County without first obtaining a building permit as required by the Levy County Building Code, a certified copy of which was identified by the Levy County Building official. Rivers paid a late fee in both instances. Although in one instance all inspections were made, in the second instance no inspections were possible because construction was essentially complete when the construction was discovered by the Levy County Building official. Rivers did fail to pay materialmen on two pools although he received payment in full for the jobs. His failure resulted in materialmen's liens being placed on the property, although Rivers provided each owner a written statement that all bills had been paid. Rivers admitted that he had not paid the materialmen because he lacked funds to do so. His contract with both parties for construction of a specified pool contained a provision stating that he would provide them an affidavit that all labor and material had been paid prior to receipt of final payment on the contract.

Recommendation Based upon the foregoing findings of fact and conclusions of law, the Hearing Officer recommends that the Residential Pool Contractor's License and General Contractor's License of Norman Rivers be suspended for a minimum of ninety (90) days and that thereafter be reinstated upon his satisfying the Board of his ability to meet his financial obligations. DONE and ORDERED this 15th day of September, 1977, in Tallahassee, Florida. STEPHEN F. DEAN Hearing Officer Division of Administrative Hearings Room 530, Carlton Building Tallahassee, Florida 32304 (904) 488 9675 COPIES FURNISHED: Mr. J.K. Linnan Executive Director Florida Construction Industry Licensing Board Post Office Box 8621 Jacksonville, Florida 32211 Mr. Norman Rivers 1710 South East 19th Street Ocala, Florida 32670

# 2
DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION vs ROBERT FOOTMAN, 01-003890 (2001)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Oct. 05, 2001 Number: 01-003890 Latest Update: Jul. 15, 2004

The Issue Whether Respondent violated Section 489.127(1)(f), Florida Statutes, as alleged in the Administrative Complaint filed against Respondent in this proceeding and should be disciplined.

Findings Of Fact At no time material to the allegations was Respondent licensed or certified as a contractor of any type by the Florida Construction Industry Licensing Board. On or about June 2000, Respondent entered into a written contractual agreement with Harold Knowles to construct a swimming pool at Mr. Knowles' residence located at 235 North Rosehill Drive, Tallahassee, Florida. The contract price for the swimming pool was $18,650.00. Mr. Knowles paid directly to Respondent $9,400.00. Respondent performed some work on the pool project and then stopped work on the project. Respondent failed to return to Mr. Knowles any monies received for the project. The homeowner was forced to pay out-of-pocket expenses to have a second, licensed pool contractor finish the pool that Respondent left unfinished. These expenses total in excess of $24,000.00. Respondent acknowledges that he had no license. Respondent testified at hearing along with his wife. It was clear that Respondent was sorry for his actions. He was unaware of the gravity of his acts. He does not have any financial resources, and a significant fine will not benefit Mr. Knowles. A substantial fine adversely impact Respondent's family more than Respondent.

Recommendation Based on the foregoing Findings of Facts and Conclusions of Law, it is RECOMMENDED: That Respondent be fined $500.00, together with the investigation and prosecution costs. DONE AND ENTERED this 18th day of February, 2002, in Tallahassee, Leon County, Florida. STEPHEN F. DEAN Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 18th day of February, 2002. COPIES FURNISHED: Patrick Creehan, Esquire Department of Business and Professional Regulation 1940 North Monroe Street Tallahassee, Florida 32388-2202 Robert Footman 2702 Lake Mary Street Tallahassee, Florida 32310 Gail Scott-Hill, Esquire Lead Professions Attorney Department of Business and Professional Regulation 1940 North Monroe Street Tallahassee, Florida 32399-0771 Hardy L. Roberts, III, General Counsel Department of Business and Professional Regulation 1940 North Monroe Street Tallahassee, Florida 32399-2202

Florida Laws (6) 120.5720.165455.2273455.228489.113489.127
# 3
CONSTRUCTION INDUSTRY LICENSING BOARD vs. FRANK D. GUTC, 84-002009 (1984)
Division of Administrative Hearings, Florida Number: 84-002009 Latest Update: Jan. 25, 1985

Findings Of Fact Respondent, Frank D. Gutc, holds registered building contractor license number R80027543 issued by petitioner, Department of Professional Regulation, Florida Construction Industry Licensing Board. When the events herein occurred, Gutc resided in Flagler Beach, Florida where he was engaged in the business of constructing residential homes. Simon and Doris Lutterbach were aware of Gutc's construction activities and approached him concerning the possibility of him building a house. The Lutterbachs had only 50,000 with which to buy a home and they conveyed this information to Gutc. Gutc showed them the plans for a three bedroom house which cost in excess of 550,000, but agreed to "downsize" the house to two bedrooms for a price of 550,000, including the lot. Thereafter, on December 11, 1982, Gutc entered into a contract with the Lutterbachs to construct a two bedroom, two bath home at 16 Prince Patric Lane in Palm Coast, Florida at a cost of 550,000. The parties later agreed that Gutc would enclose the porch for an additional 51,700, or a total contract price of $51,700. The contract called for a closing date of March 1, 1983. After the Lutterbachs gave an initial down payment of $10,000 to Gutc, Gutc obtained a $37,500 construction loan from Stockton Whatley Davin & Company. He later received an additional $1,314 from the Lutterbachs for minor changes in the plans. Construction commenced in early January, 1983, but the house was not completed by March 1. The closing date was accordingly reset to April 26, 1983. However, by that date a number of suppliers and subcontractors had filed liens totaling $28,005.37 on the house. The liens were filed even though Gutc had drawn the full amount of the construction loan from the lending institution, and had received almost $11,400 in cash from the Lutterbachs. The Lutterbachs were unable to pay off the additional liens incurred by Gutc and were consequently unable to close on the house. They have never been reimbursed the $11,314 which they advanced to Gutc to construct the home. Since that time Gutc's financial condition has deteriorated, and he has been forced to file for bankruptcy. An expert witness retained by petitioner established that the house constructed by Gutc was substantially underpriced, and that a competent contractor would have charged at least $53,800 for the house itself, exclusive of the cost of land. It was also established that a competent contractor normally prepares an itemized cost sheet whereby all costs are broken out in detail. By doing this, and using sound financial management procedures, a contractor could avoid the predicament which befell Gutc on this project. Gutc himself acknowledged that he should have asked around $70,000 for the house instead of $50,000, that he never priced out construction costs on any of his projects including the Lutterbach project, and did not know if he had made a profit on a job until the proceeds were distributed at closing. Further, he had no one keeping his books, kept no financial records, and did not seek competitive bids on his jobs. In short, while Gutc's on-site competency is not questioned, his planning and financial practices are in contravention of competency standards for the construction industry.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that respondent be found guilty of violating Subsection 489.129(1)(m), Florida Statutes, as set forth in Count III of the administrative complaint. All other charges should be dismissed. It is further RECOMMENDED that respondent pay a $1,500 administrative fine, that his registered general contractor's license be suspended for two years, and that reinstatement of said license thereafter be conditioned on respondent demonstrating that he has received adequate training or study in cost estimating and in the financial management of a construction business. DONE and ORDERED this 25th day of January, 1985, in Tallahassee, Florida. DONALD R. ALEXANDER Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 25th day of January, 1981. COPIES FURNISHED: Douglas A. Shropshire, Esquire 130 North Monroe Street Tallahassee, Florida 32301 Frank D. Gutc P.O. Box 1658 Flagler Beach, Florida 32036

Florida Laws (3) 120.57455.227489.129
# 4
CONSTRUCTION INDUSTRY LICENSING BOARD vs. WILLIAM R. MACKINNON, 76-000026 (1976)
Division of Administrative Hearings, Florida Number: 76-000026 Latest Update: Sep. 28, 1976

The Issue Whether Respondent's License as a residential pool contractor should be suspended for alleged violation of Section 468.112(7), Florida Statutes. The Respondent did not appear at the hearing although proper notice thereof had been furnished under date of February 11, 1976 to him by the hearing officer. Accordingly, the hearing was conducted as an uncontested proceeding.

Findings Of Fact Respondent has been licensed as a registered pool contractor by the Florida Construction Industry Licensing Board since June 20, 1974. The license was not renewed for 1975/76 (Exhibit 4). Respondent filed a Voluntary Petition in Bankruptcy in the U.S. District Court for the Northern District of Florida, Bankruptcy No. TBK 75-25, on March 13, 1975 (Exhibit 5).

Recommendation That the registration of William R. MacKinnon as a residential pool contractor be suspended until such time as he meets the qualifications and other requirements for renewal of registration and applies therefor. DONE and ENTERED this 5th day of April, 1976, in Tallahassee, Florida. THOMAS C. OLDHAM Hearing Officer Division of Administrative Hearings Room 530, Carlton Building Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 5th day of April, 1976. COPIES FURNISHED: David Linn, Esquire 217 South Adams Street Tallahassee, Florida 32301 Mr. William R. Mackinnon Route 3, Box 584C Tallahassee, Florida 32303

# 5
CONSTRUCTION INDUSTRY LICENSING BOARD vs WILLIAM LEETE STONE, IV, 98-001922 (1998)
Division of Administrative Hearings, Florida Filed:Naples, Florida Apr. 22, 1998 Number: 98-001922 Latest Update: Nov. 23, 1998

The Issue The issue in this case is whether Respondent violated Section 489.129(1), Florida Statutes (1997) (hereinafter, "Florida Statutes"), by committing mismanagement or misconduct in the practice of contracting, causing financial harm to a customer, abandoning a construction project, and failing to satisfy a judgment against him.

Findings Of Fact Petitioner is the state agency responsible for regulating the practice of contracting. Respondent is licensed as a contractor pursuant to license number CB C019811. At all relevant times, Respondent was the qualifying agent for Gulf and Bay Sunrooms, Inc. ("Gulf"). As the qualifying agent, Respondent was responsible for all of Gulf's contracting activities in accordance with Section 489.1195, Florida Statutes. On August 23, 1995, Respondent and Gulf entered into a contract with Mr. H. Edward Dowling ("Dowling") to install a Four Seasons System 330 Sunroom in Dowling's residence at 3016 West 38th Street, Orlando, Florida. The contract price was $31,340. Dowling paid the first draw of $9,402 to Respondent and Gulf by check number 45016644. On October 27, 1995, Gulf deposited the check to its account. Respondent and Gulf never commenced work on the sunroom. Respondent and Gulf did not return the first draw to Dowling. Respondent and Gulf abandoned the project without just cause and without notice to Dowling. On June 19, 1997, the County Court of the Ninth Judicial Circuit entered a Default Final Judgment in Case No. CO97-3800. The default judgment was entered in the amount of $9,402 plus costs of $145. Neither Respondent nor Gulf have satisfied the judgment. Respondent has a discipline history in two other cases. In Petitioner's Case No. 96-7123, Respondent failed to pay a supplier for windows. In DOAH Case No. 96-5914, Respondent contracted to build a sunroom in a residence, accepted payment of $1,540.44 toward the contract price of $4,668.00, never commenced construction, and abandoned the project. In the first case, Respondent was found guilty of failing to satisfy a civil judgment, was fined, and was ordered to pay restitution. In the second case, Respondent was found guilty of abandonment, incompetency or misconduct, was fined, and was ordered to pay restitution, and his license was suspended until Respondent complied with the penalty imposed.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Board enter a Final Order finding Respondent guilty of violating Section 489.129(1), Florida Statutes, imposing administrative fines in the aggregate amount of $15,000.00, and revoking Respondent's license. DONE AND ENTERED this 10th day of August, 1998, in Tallahassee, Leon County, Florida. DANIEL MANRY Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 Filed with the Clerk of the Division of Administrative Hearings this 10th day of August, 1998. COPIES FURNISHED: Rodney Hurst, Executive Director Department of Business and Professional Regulation Construction Industry Licensing Board 7960 Arlington Expressway, Suite 300 Jacksonville, Florida 32211-7467 Lynda L. Goodgame, General Counsel Department of Business and Professional Regulation Northwood Centre 1940 North Monroe Street Tallahassee, Florida 32399-0792 Paul F. Kirsch, Senior Attorney Department of Business and Professional Regulation Northwood Centre 1940 North Monroe Street, Suite 60 Tallahassee, Florida 32399-0792 William Leete Stone, IV, pro se 3386 Poinsettia Avenue Naples, Florida 34104

Florida Laws (2) 489.1195489.129 Florida Administrative Code (1) 61G4-17.001
# 6
CONSTRUCTION INDUSTRY LICENSING BOARD vs. DANIEL LOZEAU, 87-000445 (1987)
Division of Administrative Hearings, Florida Number: 87-000445 Latest Update: Sep. 17, 1987

Findings Of Fact Upon consideration of the oral and documentary evidence adduced at the hearing, the following relevant facts are found: At all times material hereto, Respondent was a certified pool contractor, holding license no. CP-C033753, issued by the State of Florida, Department of Professional Regulation, Construction Industry Licensing Board. At all times material hereto, Respondent's certified pool contractor's license qualified Artistic Pools and Spas, Inc. with the Florida Construction Industry Licensing Board. On or about May 19, 1986, Respondent, d/b/a Artistic Pools and Spas, Inc. entered into a contract with Joseph and Joyce Malinoski for the construction of a swimming pool at 31 Sea Harbour Drive, Ormond Beach, Florida for a contract price of $9,737.75. The contract required a down payment of ten per cent (10 percent) of the contract amount ($973.78) which was paid by the Malinoskis on May 19, 1986. The Malinoskis resided in Massachusetts at the time they contracted for the swimming pool with Respondent and had contracted for the construction of a home in Ormond Beach, Florida to begin upon the pool shell being in place. The Malinsokis returned to Massachusetts upon execution of the contract expecting Respondent to commence work on the pool two weeks after he was notified by the builder that the survey was completed and the benchmark in place. On or before June 18, 1986, Respondent contacted the Malinoskis by phone to advise them that the pool was under construction, that Respondent was ready to start pouring concrete, and that he needed the next two (2) installments (20 percent due on day of excavation and 35 percent due on day of concrete shell installation) in the amount of $5,355.76. On or about June 18, 1986, the Malinoskis forwarded a cashier's check in the amount of $5,355.76 made payable to Respondent with the understanding from Respondent that the pool was under construction. On or about June 25, 1986, the Malinoskis were advised by their building contractor that the pool was not under construction. On or about July 5, 1986, the Malinoskis returned to Ormond Beach and found that the pool was not under construction. Although the business phone at Artistic Pools and Spas, Inc. had been disconnected, the Malinoskis ultimately located the Respondent but were unable to resolve the problem until after a complaint had been filed. In early August, 1986, an agreement was reached with the Malinoskis, Respondent and David Larsen whereby Respondent would furnish the labor to build the pool, Larsen would pay the bills and the Malinoskis would pay the balance owed on the contract to Larsen and at end of construction Larsen would give the Malinoskis release of liens. The pool was constructed without the Malinoskis having to pay any additional money on the contract. The money used by Larsen to purchase materials above the amount paid to Larsen by the Malinoskis was repaid to Larsen by Respondent. Respondent supplied all the labor to construct the pool. The testimony of Respondent, which I find credible, was that the funds received by Respondent were frozen due to an Internal Revenue Service levy on the Respondent's business account which resulted in the IRS taking all the funds in the bank account, including the money from the Malinoskis. There was insufficient evidence to show that Respondent diverted the Malinoskis' funds or that the Respondent was unable to fulfill the terms of the contract. On or about November 15, 1985 Respondent, d/b/a Artistic Pools and Spas, Inc. contracted with John and Louise McGowan for the construction of a swimming pool and spa at 1266 Robbin Drive, Port Orange, Florida for an original contract price of $11,500. These were 2 addendums to the original contract bringing the total contract price to $13,005.75. The contract provided for the spa to be 7 feet long by 5 feet wide with a depth ranging from 18 inches to 36 inches. As constructed, the spa was 5 feet long by 5 feet wide with a depth of 44 inches. The spa was also unlevel resulting in water spilling on to the deck rather than into the spillway to the pool. The therapy jets were located too deep in the spa to allow them to function properly. The spa has never been operational. Respondent was aware of the deficiencies in the construction of the spa but failed to correct them. The deck around the pool was not properly finished in that it is uneven and rough in several locations and is pitched toward the pool rather than away from the pool. The deck also has several facial cracks (not structural) which indicate a nonuniform thickness. As contracted, the pool was to have 3 return fittings of which only 2 were installed. The contract called for the installation of a heater by the Respondent. Although the heater was installed, it was improperly placed resulting in the inspector putting a "red tag" on the heater and having the gas company disconnect it. The McGowans have paid all but $575 of the contract price but refuse to pay the balance until corrections are completed. Respondent was aware of the deficiencies in the construction of the pool but failed to correct them. The evidence is clear that Respondent failed to properly supervise the construction of the McGowans' pool and spa, thereby resulting in poor workmanship in the construction of the pool and spa.

Recommendation Having considered the foregoing Findings of Fact, Conclusions of Law, the evidence of record and the candor and demeanor of the witnesses, it is, therefore RECOMMENDED that the Florida Construction Industry Licensing Board (Board) enter a final order finding Respondent guilty of violating Section 489.129(1)(j) and (m), Florida Statutes and for such violation it is Recommended that the Board assess the respondent with an administrative fine of $500.00 and suspend the Respondent's pool contracting license for a period of two (2) years, stay the suspension, and place Respondent on probation for a period of two (2) years, provided the Respondent pays the administrative fine of $500.00 within sixty days of the date of the Final Order. It is further Recommended that the charges of violating Section 489.129(1)(h) and (k), Florida Statutes be DISMISSED. Respectfully submitted and entered this 17th day of September, 1987, in Tallahassee, Leon County, Florida. WILLIAM R. CAVE Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 17th day of September, 1987.

Florida Laws (3) 120.57489.105489.129
# 7
CONSTRUCTION INDUSTRY LICENSING BOARD vs. STEPHEN J. BOROVINA, 77-001442 (1977)
Division of Administrative Hearings, Florida Number: 77-001442 Latest Update: Feb. 21, 1978

The Issue The Florida Construction Industry Licensing Board, Petitioner, seeks to revoke the registered contractor's license of Stephen J. Borovina, Respondent, based on allegations, which will be set forth in detail hereafter, that he engaged in conduct violative of Chapter 468, Florida Statutes. The issue presented is whether or not the Respondent aided or abetted and/or knowingly combined or conspired with Mr. Howard North, an uncertified or unregistered contractor, to evade the provisions of Chapter 468.112(2)(b), and (c), Florida Statutes, by allowing North to use his certificate of registration without having any active participation in the operations, management, or control of North's operations. Based on the testimony adduced during the hearing and the exhibits received into evidence, I make the following:

Findings Of Fact The Respondent is a certified general contractor who holds license no. CGC007016, which is current and active. On or about July 25, 1976, Mr. and Mrs. Julius Csobor entered into a contract with Mr. and Mrs. Howard North for the construction of a home in Martin County, Florida, for a total price of $35,990. Neither Mr. or Mrs. North are certified or registered contractors in the State of Florida. (Petitioner's Composite Exhibit #2). Respondent applied for and was issued a permit by the Martin County Building Department to construct a residence for the Csobors at the same address stipulated in the contract between the Csobors and the Norths, i.e., Northwest 16th Street, Palm Lake Park, Florida. (Petitioner's Composite Exhibit #1). Howard North, a licensed masonry contractor for approximately nine (9) years was contacted by the Csobors through a sales representative from a local real estate firm. It appears from the evidence that North had previously constructed a "spec" house which the local realtor had sold and thus put the Csobors in contact with Mr. North when they were shown the "spec" house built by North. Evidence reveals that North contacted Borovina who agreed to pull the permit "if he could get some work from the job and could supervise the project". Having reached an agreement on this point, North purchased the lot to build the home for the Csobors and he orally contracted with the Respondent to, among other things, pull the permit, supervise construction, layout the home and do trim and carpentry work. North paid Respondent approximately $200 to layout the home for the Csobors. By the time that North had poured the slab and erected the subfloor, the Csobors became dissatisfied with his (North's) work and demanded that he leave the project. According to North, Respondent checked the progress of construction periodically. Prior to this hearing, the Csobors had never dealt with Respondent in any manner whatsoever. According to Csobor, North held himself out as a reputable building contractor. A contractor is defined in relevant part as any person who, for compensation, undertakes to, or submits a bid to, or does himself or by others, construct, repair, etc. . . . real estate for others. . . Chapter 468.102(1), Florida Statutes. Applying this definition to the facts herein, it appears that the Respondent, at least in a literal sense, satisfied the requirements and obligations of a contractor, as defined in Chapter 468.102, Florida Statutes. Thus, he contracted with North to oversee and/or supervise the project for the Csobors which he fulfilled, according to the testimony of North. Said testimony was not refuted and thus I find that no effort was made by Respondent to evade any provision of Chapter 468, Florida Statutes. Accordingly, I shall recommend that the complaint filed herein be dismissed in its entirety.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is hereby recommended that the complaint filed herein be dismissed in its entirety. RECOMMENDED this 4th day of November, 1977, in Tallahassee, Florida. JAMES E. BRADWELL Hearing Officer Division of Administrative Hearings 530 Carlton Building Tallahassee, Florida 32304 (904) 488-9675 COPIES FURNISHED: Barry S. Sinoff, Esquire 1010 Blackstone Building Jacksonville, Florida 32202 Stephen J. Borovina 2347 Southeast Monroe Street Stuart, Florida 33494 J. Hoskinson, Jr. Chief Investigator Florida Construction Industry Licensing Board Post Office Box 8621 Jacksonville, Florida 32211 ================================================================= AGENCY FINAL ORDER ================================================================= BEFORE THE FLORIDA CONSTRUCTION INDUSTRY LICENSING BOARD FLORIDA CONSTRUCTION INDUSTRY LICENSING BOARD, Petitioner, vs. DIVISION OF ADMINISTRATIVE HEARINGS, DOCKET NO. 77-1442 STEPHEN J. BOROVINA, CG C007016, 2347 S. E. Monroe Street, Stuart, Florida 33494, Respondent. / This cause came before the FLORIDA CONSTRUCTION INDUSTRY LICENSING BOARD at its regular meeting on February 10, 1978. Respondent was sent the Hearing Officer's findings and recommendations and was given at least 10 days to submit written exceptions to the recommended order. Respondent was notified of the meeting so that respondent or counsel might appear before the Board. Respondent did not appear The FLORIDA CONSTRUCTION INDUSTRY LICENSING BOARD on February 10, 1978, after reviewing a complete transcript of the Administrative Hearing, by motion duly made and seconded voted to revoke the certified general contractor's license of STEPHEN J. BOROVINA. It is therefore, ORDERED that the certification of respondent STEPHEN J. BOROVINA, Number CG C007016, be and is hereby revoked. Respondent is hereby notified that he has 30 days after the date of this final order to appeal pursuant to Chapter 120, Florida Statutes, and the Florida Appellate Rules. DATED this 13th day of February, 1978. FLORIDA CONSTRUCTION INDUSTRY LICENSING BOARD BY: JOHN HENRY JONES, President ================================================================= SECOND AGENCY FINAL ORDER ================================================================= BEFORE THE FLORIDA CONSTRUCTION INDUSTRY LICENSING BOARD STEPHEN J. BOROVINA, CG C007016, Respondent/Appellant, vs. DIVISION OF ADMINISTRATIVE HEARINGS, DOCKET NO. 77-1442 FLORIDA CONSTRUCTION INDUSTRY LICENSING BOARD, Petitioner/Appellee. / This cause came before the Florida Construction Industry Licensing Board at its regular meeting on August 3, 1979. The respondent was sent the Hearing Officer's findings and recommendations and was given at least 10 days to submit written exceptions to the recommended order. Respondent was notified of the meeting so that respondent or counsel might appear before the Board. Respondent did appear. The Florida Construction Industry Licensing Board, on August 3, 1979, after reviewing a complete transcript of the Administrative Hearing, by motion duly made and seconded, voted to revoke the certified general contractor's license of Stephen J. Borovina, No. CG C007016. On February 13, 1978, the certification of respondent, Stephen J. Borovina, No. CG C007016, was revoked by order of the Florida Construction Industry Licensing Board. On April 25, 1979, the District Court of Appeal of the State of Florida, Fourth District, in Case Number: 78-527, reversed the final order of the Florida Construction Industry Licensing Board. That Court remanded the above captioned case to the Board to further consider the matter and enter such order as it may be advised in conformity with Section 120.57(1)(b)(9), Florida Statutes (1977). In accordance with the decision of the Florida District Court of Appeal, Fourth District, the Board has reconsidered the above captioned matter and finds as follows: The Board rejects the recommended order as the agency's final order. The Board adopts the first paragraph of the hearing officer's finding of fact. The Board, however, rejects the findings of fact found in the second paragraph of the hearing officer's findings. The second paragraph states as follows: A contractor is defined in relevent(sic) part as any person who, for compensation, undertakes to, or submits a bid to, or does himself or by others, construct, repair, etc. real estate for others...Chapter 468.102(1), Florida Statutes. Applying this definition to the facts herein, it appears that the Respondent, at least in a literal sense, satisfied the requirements and obligations of a contractor, as defined in Chapter 468.102, Florida Statutes. Thus, he contracted with North to oversee and/or supervise the project for the Csobors which he fulfilled, according to the testimony of North. Said testimony was not refuted and thus I find that no effort was made by Respondent to evade any provision of Chapter 468, Florida Statutes. Accordingly, I shall recommend that the complaint filed herein be dismissed in its entirety. The findings of fact found in the above-quoted paragraph were not based upon competent substantial evidence. The competent substantial evidence supports a finding that the respondent, Stephen J. Borovina, did not supervise the project and that Borovina evaded the provisions of Chapter 468, Florida Statutes. The following evidence supports the Board's position: There was no written agreement entered into between Howard North and the respondent which indicated that the respondent was to supervise the construction of the Csobors' house (T- 14); It was conceded at the hearing that the only subcontractors or draftmen who worked on the Csobors' house were contracted solely by Howard North and they had no contract whatsoever with the respondent (T-19, 25); The respondent never advised or informed Mr. and Mrs. Csobor that he was the contractor on the job. (T-51); At all times during the act of construction of the house, Mr. and Mrs. Csobor were under the impression that Howard North was the contractor (T-44-51). It is, therefore, ORDERED: That the certification of respondent, Stephen J. Borovina, Number CG 0007016, be and is hereby revoked. Respondent is hereby notified that he has thirty (30) days after the date of the Final Order to appeal pursuant to Chapter 120, Florida Statutes, and the Florida Appellate Rules. Dated this 3rd day of August, 1979. FLORIDA CONSTRUCTION INDUSTRY LICENSING BOARD BY: JOHN HENRY JONES, President

Florida Laws (1) 120.57
# 9
CONSTRUCTION INDUSTRY LICENSING BOARD vs. MARTIN GOLD, 88-003310 (1988)
Division of Administrative Hearings, Florida Number: 88-003310 Latest Update: May 30, 1989

Findings Of Fact Based upon the record evidence, the Hearing Officer makes the following findings of fact: Martin Gold is now, and has been since July, 1986, licensed by Petitioner as a Registered Specialty Contractor authorized to do painting and waterproofing work in Dade County. He holds license number RX 0051718, which expires June 30, 1989. Since receiving his license he has been disciplined twice by the Florida Construction Industry Licensing Board. Gold is the President of Team Leisure Corp., a construction company, and is also its "qualifying agent." On August 14, 1986, Team Leisure Corp. entered into a written contract with Terry Dudley and his wife, Patricia, in which it agreed, for $12,000, to build a two-room, 27-foot by 13- foot addition to the Dudley home located at 15510 Leisure Drive in Dade County and to install new windows in the existing structure. According to the terms of the agreement, Team Leisure was to do "no painting." In his capacity as President of Team Leisure Corp., Gold hired William Sernaker to directly oversee the completion of the construction work specified in the Dudley contract. At the time, Sernaker was licensed as a general contractor in Dade County. As part of his arrangement with Gold, Sernaker assumed responsibility for ensuring that all work permits and inspections necessary to complete the Dudley project were obtained. On September 4, 1986, Sernaker obtained a building permit for the Dudley project. Thereafter, work on the project commenced. The foundation for the addition was laid and, on September 10, 1989, it passed the inspection of James Tucker, a Dade County building inspector. Fifteen days later, Tucker conducted a tie beam inspection. This phase of the project also received his formal approval. Sernaker obtained a roofing permit on October 14, 1986. The exterior of the roof was inspected by Russell Bergsma, another Dade County building inspector, on October 21, 1986. It too passed inspection. An electrical permit was obtained for the Dudley project on November 17, 1986, by Robins Electric, a subcontractor. When the electrical work was initially inspected by Grant Morse, another Dade County building inspector, it was rejected because there were a "few outlets missing." The record is unclear as to the results of any subsequent electrical inspections. Morse also conducted an inspection of the framing work done on the Dudley project. He did so on or around November 21, 1986. In his view, the framing was "not to code." Accordingly, he left a "tag" at the job site on which he gave the following written explanation for his rejection of the framing work: All window bucks must be tight with caulking, no gaps. When the stucco meets the window frame, it should be set back at approximately a 45-degree angle at a width of one quarter to provide a groove to be filled with caulking. Continuous back bed of caulking must be maintained. A follow-up inspection of the framing work was performed by Bergsma on December 1, 1986. In Bergsma's opinion, while some corrections had been made, deficiencies remained. He therefore issued another rejection. A third framing inspection was conducted on December 3, 1986. Tucker was the inspector who performed this inspection. He approved the work that had been done. Prior to this inspection, Gold had paid another contractor $600 to "redo" the framing. This additional expense was not passed on to the Dudleys. Morse attempted to conduct a final building inspection on December 22, 1989. He was unable to do so, however, because "[n]o one was home." From the outset, Gold kept abreast of the progress that was being made on the Dudley project by communicating with Sernaker. He also visited the job site on at least a weekly basis. Gold also heard from the Dudleys concerning the status of the project. The Dudleys closely monitored the work of Sernaker and his crew. If the work was not done to their satisfaction, they expressed their disapproval to Sernaker and, if he did not rectify the matter, they complained to Gold over the telephone. The following were among the complaints made by the Dudleys: the foundation was not level; the roof did not contain any fiberglass material; the window frames did not fit properly; the wood used for the open beam ceilings had cracks in it and was unsightly; the walls in the den were not level and had cracks in them; the linoleum on the Dudleys' screened-in porch was ripped by workers putting up a wall; the outside stucco was cracking and peeling; and trash was left on the property. An effort was made to address the Dudleys' concerns. For instance, in response to the Dudleys' complaints, a "thin cap" was placed over the foundation to make it level. The roof was redone with fiberglass material. The Dudleys were reimbursed for the linoleum they needed to replace on their porch. A contractor was hired to correct the framing problem. Nonetheless, the Dudleys became increasingly dissatisfied with Team Leisure Corp.. Sometime shortly before January 6, 1987, they became so dissatisfied that they ordered Sernaker and his crew off their property and refused to make any additional payments. Following this incident, Gold met with the Dudleys and attempted to mollify them. This was his first face-to-face meeting with them. He offered to send another contractor to the Dudleys' home to perform the work the Dudleys believed needed to be done to satisfactorily complete the project. The Dudleys accepted this offer. On January 6, 1987, Gold sent the Dudleys a letter which read as follows: As per our mutual agreement, these are the items you requested be taken care of. Once taken care of, you agree to sign completion certificate so we can be funded. COMPLETED (please check upon satisfaction) 1.) Touch up outside windows. 2.) Windows to be locked in. 3.) Walls in den to be taken down and leveled out. 4.) Frame around closet door. 5.) Fix two windows; replace concrete in doors and windows. 6.) Clean up. 7.) Replace vinyl, in rear den. 8.) $100.00 dollars to Mrs. Dudley, for clean-up. 9.) 10 year guarantee- roof and release of lien [sic]. 10.) Concrete over build. 11.) Crack under window sill. 12.) Nail in door frame. 13.) Gaps in drywall bedroom. 14.) Stucco cracking outside. 15.) Electrical inspection. (not to be Mike Charles.) Accepted and Approved: x x After receiving this letter, Mr. Dudley checked all but items 2, 5, 6, 8, and 9 on the letter's "completion certificate." Neither he nor his wife, however, signed this "completion certificate." Although the cracks in the outside stucco had been repaired at the time Dudley checked item 14, the stucco subsequently started cracking again. A final building inspection of the Dudley project was conducted by Tucker on January 13, 1989. The project was "turned down" by Inspector Tucker because it was unpainted. Under their contractual agreement, the Dudleys, not Team Leisure Corp., were responsible for the painting of the project. The painting was not done because the Dudleys noticed cracks reappearing in the outside stucco. On or around March 4, 1987, Mr. Dudley telephoned Inspector Bergsma and asked him to conduct an informal field inspection of the project. Bergsma complied with Dudley's request. When he arrived at the Dudley home, Dudley showed him a "gap on the rear of the house ... where the two roofs are at different levels and come together." Bergsma told Dudley that "[i]t didn't belong there" and that it would have to be eliminated if the structure was to pass a final building inspection. As of the date of the hearing, the structure had not passed such an inspection. Team Leisure Corp. received $10,200 for the work done in connection with the Dudley project. The remaining $1,800 of the $12,000 that the Dudleys were to pay pursuant to the contract was held in escrow by a bank. Ultimately, this $1,800, along with approximately an additional $500 from Team Leisure Corp., was given to the Dudleys as part of a settlement between them and Team Leisure Corp.. The money was to be used by the Dudleys to pay another contractor to complete the project to their satisfaction.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is hereby RECOMMENDED that the Construction Industry Licensing Board enter a final order (1) finding Respondent guilty of contracting outside the scope of his license in violation of Section 489.129(1) (j) , Florida Statutes; (2) imposing a $750 administrative fine upon Respondent for said violation, and (3) dismissing the remaining charges against Respondent set forth in the instant administrative complaint. DONE AND ENTERED in Tallahassee, Leon County, Florida, this 30th day of May, 1989. STUART M. LERNER Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 30th day of May, 1989. COPIES FURNISHED: Elizabeth Alsobrook, Esquire Northwood Centre 1940 North Monroe Street Suite 60 Tallahassee, Florida 323399-0792 Fred Seely Executive Director Construction Industry Licensing Board Post Office Box 2 Jacksonville, Florida 32201 Carlos Garcia, Esquire 8603 Dixie Highway Suite 400 Miami, Florida 33143 =================================================================

Florida Laws (8) 120.5717.001489.105489.115489.117489.119489.12990.202