LAKE WORTH DRAINAGE DISTRICT vs. DEPARTMENT OF ENVIRONMENTAL REGULATION, 83-001741 (1983)
Division of Administrative Hearings, Florida Number: 83-001741 Latest Update: May 02, 1984

Findings Of Fact Lake Worth Drainage District requested a variance from the provisions of Rule 17-3.121(13) , Florida Administrative Code, related to dissolved oxygen parameters which would be involved in the installation of a canal known as the S-9 Canal to be located in Palm Beach County, Florida. That request was met by the Department of Environmental Regulation's Statement of Intent to Deny, leading to a request for formal hearing filed by Petitioner with the Department on May 26, 1983. On June 1, 1983, the Department requested the Division of Administrative Hearings to conduct a formal hearing in that matter. The variance request became D.O.A.H. Case No. 83-1741. Contemporaneous with the variance request that was pending before the Department of Environmental Regulation, was petitioner's request for necessary construction permits to install the S-9 Canal. Again, the Petitioner was informed of the agency's intent to deny that permit request. As a consequence, Petitioner requested a formal hearing to question the Department's policy decision. That request for formal hearing was made on June 23, 1983. Effective July 1, 1983, the Department asked the Division of Administrative Hearings to conduct a formal hearing related to that permit request. The case related to the dredge and fill permit is D.O.A.H. Case No. 63-2132. WITNESSES AND EXHIBITS In the final hearing, petitioner presented the testimony of Richard Wheeliahn, Assistant Manager for Lake Worth Drainage District; John Adams, General Counsel for Lake Worth Drainage District; Mike Slaton, supervisory biologist with the United States Corp. of Engineers; William Winters, Lake Worth Drainage District's in-house engineer; Rebecca Serra, South Florida Water Management District's Water Management Engineer, who was accepted as an expert in water management engineering; Raleigh Griffis, Agricultural Agent with the United States Department of Agriculture, accepted as an expert in the agricultural practices found within the area of the proposed S-9 Canal; William E. Hill, Consulting Engineer for Petitioner, who was accepted as an expert in civil engineering and drainage design; and Robert D. Blackburn, consultant to Lake Worth Drainage District, accepted as an expert in freshwater ecology to include water quality and biology. Respondent called as witnesses Dan Garlick, Environmental Specialist for the Department of Environmental Regulation, accepted as expert in dredge and fill matters; Keith McCarron, Environmental Specialist for the Southeast Branch of the Department of Environmental Regulation, accepted as an expert in dredge and fill matters and Helen Setchfield, Technical Assistant to the Department's Director of the Division of Environmental Permitting. In addition, Richard L. Miller, Rebecca Butts, Francis T. Kuschell, Donald King and Dan alley were public witnesses in favor of the proposed project. Rosa Druando and Sherry Cummings were public witnesses opposed to the project. Petitioner offered 45 exhibits which have been received. Respondent introduced two exhibits which were admitted. The public offered two composite exhibits which were admitted. SPECIFIC FACTS Lake Worth Drainage District is a governmental entity created by the Florida Legislature. The District's function is that of the control of water supply and elevation related to lands within its jurisdiction. Those areas in dispute in the present case are within that jurisdictional ambit. In this instance, Lake Worth Drainage District has proposed the construction of a drainage facility involving dredging and filling of approximately 45,000 cubic yards of material. In particular, Petitioner seeks necessary permits from Respondent to construct a canal known as the S-9 Canal, whose purpose would be to transport the flow of water from an agricultural operation north of the canal site. Petitioner's Exhibit No. 1 depicts the area in question with the north- south orange tape representing an unnamed drainage ditch or canal and the blue tape showing the proposed S-9 connecting it to the east-west orange tape line which is L23W. The primary type of water expected in the canal is stormwater; however, surface and groundwater will also be in the canal system at times. The agricultural operation is capable of discharging at a rate which would utilize 145 CFS of the potential capacity of the canal system contemplated for construction which ultimate capacity is 170 CFS. The proposed canal by its connection of the existing agricultural drainage ditch or canal and L23W, becomes part of a water transport system flowing to the Atlantic Ocean through the South Florida Water Management District and Lake Worth Drainage District canal network. The principal benefit of the construction of S-9 would be to create a uniform connection of water discharge from the agricultural operation into L23W. Secondarily, it would relieve periodic flooding of a residential area west of the unnamed drainage ditch and northwest of the proposed S-9 Canal. It is not designed to receive direct water input from that residential area. Only the agricultural operation has been granted permits to discharge into the unnamed canal through two pumping stations to the east of that canal and as a result of the present permit request through S-9 and thus to L23W. Those persons living in the residential area west of the unnamed canal have not sought necessary permitting for discharge into the proposed S-9 System. Moreover, even if permits were granted to the residents, the S-9 system would only allow the addition of 25 CPS over and above the 145 which the agricultural operation has preempted. The 25 CPS would not satisfactorily address high water problems found in the residential area. A more particular description of the limited value of the project's benefit to the homeowners is that it protects against occasional flooding which occurs when the farm operation discharges into the unnamed canal, causing water incursion in the southeast corner of the residential area to the west of the unnamed canal. If the S-9 Canal is constructed, it will be built within an 80 foot right-of-way held by petitioner. The canal as depicted in petitioner's Exhibit 35 admitted into evidence is 40-45 feet wide, approximately 5-8 feet deep and is configured in a u-shape transversing an area of 7,730 feet. The applicants in this present proposal have added a vegetated iittoral zone on one side of the canal and it covers approximately 20 percent or 1.9 acres of the canal surface. This zone affords a limited amount of treatment of the water in the system. In this regard, approximately 30 percent of the nutrients found within the water flowing in the system would be expected to be taken up or absorbed in the vegetational zone, except in the months of August and September, when optimum retention time within the system will not be afforded to allow the littoral zone to uptake 30 percent of contaminants in the water. A 21 foot maintenance berm would be constructed on the east side of the canal and bleeder pipes would be installed to control water elevations in the adjacent wetlands. The 170 CFS volume mentioned before is the design capacity of the proposed system. At that volume, the flow velocity is less than 2.6 feet per second, a velocity at which the canal's structural integrity would be expected to continue, i.e., erosion will not occur. The 145 CFS expected from the agricultural operation pursuant to permits for discharge issued by the South Florida Water Management District would promote a flow velocity of approximately 2 feet per second. This farm activity is known as the DuBois farm. (Its permit from the South Florida Water Management District allowing the 145 CFS to be discharged into the unnamed drainage ditch or canal is not contingent upon the construction of S-9.) The configuration of the S-9 Canal has been brought about principally to advantage the Petitioner in obtaining a construction permit from the United States Corps of Engineers. The Corps had an interest in protecting that corridor of land over which it has jurisdiction which is adjacent to the S-9 Canal and is described as a wetland area. A consequence of this choice of design for S-9 is the typical 72 to 80 hour travel time of water introduced into the system providing some settling of pollutants and some assimilation of pollutants within the littoral zone of the canal discussed before. 10..Necessary permits have been obtained from South Florida Water Management District and the United States Corps of Engineers to allow the construction of the proposed project. The configuration of this project takes into account the special concerns of those two agencies. In this sequence of collateral permitting, South Florida Water Management District has been responsible for an examination of stormwater quality considerations in deciding to grant a permit to Petitioner. With the construction of S-9 and connection of the unnamed canal to S- 9 and thus to L23W, all the waters within that conveyance system become Class III waters of the state in keeping with Chapter 403, Florida Statutes and its associated rules of the Florida Administrative Code. In effect, this is a dredge and fill activity under the Respondent's jurisdiction found in Rule 17- 4.20, Florida Statutes. As such, it becomes a stationary installation which can reasonably be expected to be a source of water pollution of waters of the state by discharge of pollutants into waters of the state as envisioned by Section 403.087, Florida Statutes. During the construction phase of the canal, water quality degradation can be controlled related to turbidity, transparency and other criteria. Upon connection of the S-9 Canal to L23W and the utilization of that system, problems will be experienced with dissolved oxygen levels and to a lesser extent, nutrients and total coliform. Oils and greases problems are possible though not probable. No other water quality impacts are expected after connection. In expectation of the difficulty in achieving compliance with Respondent's water quality standards related to dissolved oxygen, the Petitioner has sought a variance under Section 403.021, Florida Statutes. This request is necessary because the dissolved oxygen levels in the proposed S-9 Canal, the unnamed canal or drainage ditch and L23W are not expected to uniformly exceed 5 mg/1. See Rule 17-3.121(13), Florida Administrative Code. The problem with dissolved oxygen in the unnamed canal and L23W and expected in the S-9 canal is not an enigma. This condition is prevalent in the South Florida area to include Palm Beach County, the site of the project. The water in the canals and drainage ditches in the region is frequently in violation of the standards related to dissolved oxygen, given the elevations of the land, climatic conditions, type of plant life, water temperature and constituents of the water. The addition of S-9 to the system would neither improve nor significantly degrade the quality of water related to the dissolved oxygen values for Class III waters, of which this proposed system is constituted. This finding acknowledges the fact that dissolved oxygen values in the unnamed canal are superior to L23W. Nonetheless, upon completion of S-9 and connection to the two other canals, no significant positive improvements of dissolved oxygen will be realized. Moreover, considering the fact that the installation of the S-9 Canal will stop the flooding on the southeast corner of the residential area west of the unnamed drainage ditch or canal, an increased volume of water flowing into L23W at any given moment can be expected, compared to the present outfall primarily along the Florida Power and Light system road into L23W. This has significance related to the dissolved oxygen standard to the extent of an increased volume of water in which substandard dissolved oxygen levels are found being introduced into L23W. It is more significant related to nutrients and bacteriological quality of the water, in particular fecal coliform. While there is no reason to believe that the quality of cleansing of water involved in sheet flow into L23W related to nutrients and coliforms is remarkably better at present, given the sparse vegetation along the power-line road which leads to L23W, than would be the case with S-9 with littoral zone, the increased volume of cater being introduced at the connection of S-9 and L23W during times of peak discharge, can be expected to present greater quantities of nutrients and coliform. In essence, the treatment afforded by the littoral zone and the transport in the S-9 Canal, contrasted with the treatment afforded during the transport of waters by sheet flow along the relatively barren stretch of land adjacent to the power-line road is found to be comparable, and the differences relate only to volume of discharge. This difficulty with nutrients and coliform count has been confirmed by tests made in the unnamed canal showing excessive levels of nitrogen, phosphorus and coliform and the water treatment features of the S-9 Canal will not entirely remove these materials. Although the farming practices of the DuBois operation tend to alleviate some nutrient loading in the unnamed canal, the test results established that those practices do not entirely eliminate the introduction of those nutrient materials into the canal. Consequently, some problems related to the effects of nutrient loading on populations of flora and fauna in the proposed system can be expected. In the context of the variance request, alternatives to the construction of the S-9 Canal are here considered. The alternative to leave the circumstance as it now exists carries with it the risk of periodic flooding of the southeast corner of the residential property west of the unnamed canal. That area and the balance of the residential acreage are subject to flooding without regard for the agricultural operation to the east. To deal with the difficulty related to the elevated water table, rainfall events and the flooding due to farm operation, some persons who reside in that residential tract have employed their own pump systems and ditches and retention areas to combat problems related to the geography of their property. In addition, the property is protected to some extent from outside influences by the existence of a dike and associated ditch, which limit some off-property incursion of water and assists to an extent in the transport of water away from their property. Moreover, the DuBois farm operation recently has placed a barrier at the end of the unnamed canal which directs water south along the Florida Power and Light road into L23W. In addition, the farm management has held down the pump speed during a rain event to protect the residential area. Nonetheless, at times the dike in the southeast corner adjacent to the residential property has breached in heavy rain events. As an alternative, the installation of S-9 would be only partially effective in alleviating the adverse conditions in the residential area west of the unnamed canal. It principally helps the DuBois farm operation. The relief afforded the residents would be the cessation of flooding caused by the operation of the farm pumps to the east as they breach the area in the southeast corner of the residential property, the future possibility of introducing as much as 25 CFS into the S-9 System subject to appropriate permits and the more tenuous possibility that the farm operation and the residential area could share the remaining 145 CPS capacity in the proposed system. The latter point isn't tenable from an examination of testimony at hearing. First, because the farmer wishes to conserve fertilizer and to maintain the moisture gradient and he does this by pumping off stormwater in a rainfall event, which events are most prevalent during his agricultural season. Secondly, the residential area is most in need of relief when the farmer is. Finally, the question of necessary permits to share capacity is unclear. Other alternatives related to a more comprehensive protection of the residential area by diking, a direct connection canal system to L23W from the unnamed canal, or dispersed sheet flow through the wetland area adjacent to the proposed S-9 Canal are not viable either for reason of design infirmity or impediments from other permitting agencies or inadequate property rights. Therefore, the viable choices are to either leave the property as it now stands or grant a permit to allow the construction of S-9. Between the remaining choices, no particular advantage is gained by the construction of this project. Dissolved oxygen problems in L23W, the receiving body of water, will not improve with the S-9 construction in a significant way and given the increased volume of discharge into L23W promoted by this construction are made worse. Nothing in the construction is so compelling to cause the exercise of the Respondent's discretion in favor of the grant of a variance related to dissolved oxygen values. 16..In examining the variance request by affording deference to Petitioner's regulatory responsibility, the need of the Lake Worth Drainage District to provide relief to those residents who are paying for drainage services is conceded. To that end, the proposed project does provide a certain amount of relief but it does not have as its primary emphasis purported assistance to those residents. As often stated, its principal benefit is to the DuBois farm operation. Left unresolved is the major source of suffering which is the lay of the land, a source which has prevailed from the beginning of the utilization of that property on the part of the residents. Plainly stated, much of the residential area was from the beginning and continues to be under water. The removal of the farm flooding and the future possibility of introducing a small increment of discharge into the S-9 system from the residential area subject to necessary permitting does not modify the characterization of this project as being one primarily for the farmer and to a much lesser extent for the residents. On this occasion, Petitioner's choice to fulfill its change is not persuasive enough to create special permission to violate the dissolved oxygen standard. In summary, a variance from the dissolved oxygen standard for Class III waters is not indicated. On the question of the permit application, in addition to failing to give reasonable assurances related to dissolved oxygen, the applicant has failed to satisfactorily address the problems with nutrients and coliforms. Other water quality standards have been satisfactorily addressed. Again, most of the water that will be introduced into the proposed system shall be stormwater; however, there will be other water components in the system constituted of surface water an groundwater, which also carry nutrients arid bacteriological deposits. Surface and groundwater are involved, given the level of elevations in the area, the depths of the unnamed canal, S-9 Canal and L23W and the fact that the DuBois farm operation can extract waters from the E-l Canal to the east of the farm properties as well as discharge water into that canal. It will not always be possible to distinguish whether the water in the proposed system is stormwater, groundwater or surface water. Consequently, South Florida Water Management's permitting related to stormwater is not definitive.

Florida Laws (4) 120.57403.021403.087403.201
# 1
CITY OF COCONUT CREEK AND MR. AND MRS. W. H. LEE vs. BROWARD COMMUNITY COLLEGE AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 83-003672 (1983)
Division of Administrative Hearings, Florida Number: 83-003672 Latest Update: Oct. 30, 1984

Findings Of Fact Based on the stipulations of the parties, the exhibits received in evidence, and the testimony of the witnesses at the hearing, I make the following findings of fact: On April 21, 1983, the College filed an application with DER seeking a permit to relocate a drainage ditch that runs through the College property, to fill the existing drainage ditch, and to install a large culvert in the Coconut Creek Waterway which would serve as a road crossing connecting the proposed new College parking lot and N.W. 39th Avenue in Coconut Creek. Upon review of the original application, DER determined that it would not meet the DER's water quality criteria. On September 30, 1983, the College revised its application. It is the revised application which lies at the heart of the present controversy. The revised application no longer contains a proposal to fill in the entire ditch that runs through the College property. Rather, it is new proposed to install two 36-inch culverts in the existing ditch to provide access roads to the proposed new College parking lot. The College also proposed to dredge 832 cubic yards from .5 acres and to install a large structural culvert (measuring 14 feet, 1 inch, by 12 feet, 10 inches) in the Coconut Creek Canal. The existing ditch which runs through the College campus was originally constructed as a drainage ditch. The only water which would flow through that ditch would be provided by run off from the N.W. 11th Street area. At the present time the ditch through the College is plugged in two places. Some time in late July or early August of 1984, contractors employed by the College placed two earthen plugs in the ditch that runs through the College. This was done without benefit of a Department permit and was apparently the result of some confusion on the part of the contractors, the exact nature of which is not explained in the record in this case. The two earthen plugs were not installed in the manner proposed by the subject application, nor were they installed in the locations proposed in the subject application. In their present condition the two earthen plugs effectively prevent the flow of any water through the ditch that runs through the College. The north end of the ditch that runs through the College campus was formerly connected to Coconut Creek Canal. A portion of Coconut Creek Canal runs parallel to N.W. 11th Street. Following the installation of the earthen plugs there was a decrease in the water quality of the portion of Coconut Creek Canal that parallels N.W. 11th Street. The water became cloudier than before and there was some silting. There were fewer base and bluegills and more mudfish. There has also been an occasional unpleasant odor from the area which was not present prior to the installation of the earthen plugs. Also, the residents along N.W. 11th Street complain of an increased mosquito Population since the installation of the earthen plugs. 1/ The proposed 36-inch culverts are substantially larger than is necessary to handle the anticipated flow of water through the College ditch. Calculations made using the methodology approved by the Florida Department of Transportation indicates that 21-inch culverts would have been sufficient to handle any anticipated flow of water through the College ditch. Although the culverts will require some periodic maintenance, they have been designed to minimize the need for maintenance. Properly maintained, the proposed 36-inch culverts will not pose any impediment to the flow of water through the College ditch. There is usually no detectable current or water flow in either Coconut Creek Canal or the College ditch in the area where the College proposes to install the three culverts. Accordingly, inasmuch as there is usually no detectable flow of water, any impediment to water flow which might be caused by the culverts is insignificant. This is particularly true with regard to the issue of weed growth. While it has been contended that the culverts might reduce the rate of water flow to the extent that aquatic weed growth would be promoted because of the stillness of the water, long before this permit was ever applied for and long before the earthen plugs were installed the City of Coconut Creek had serious problems with aquatic weeds growing in all of its canals. As described by one of the City's former mayors, several years ago the hyacinths covered the canals solid from bank to bank and were growing so thick and solid that rabbits could actually run across the canals hopping on the hyacinths. This type of hyacinth growth only occurs in still water. The City has been able to control the hyacinth problem by an ongoing weed control program which consists of spraying chemicals on the plants several times each year. The small amount of water flow which does occur in Coconut Creek Canal is directly related to stormwater runoff, including water generated by the residents along N.W. 11th Street washing their cars and watering their lawns. The portion of Coconut Creek Canal which extends eastward from the College ditch is a dead end system in which the only flushing is due to water runoff from the street. The installation of the proposed large culvert in Coconut Creek Canal would never cause the water to back up in the canal or otherwise impede the flow of water in the canal. A tube 21 inches in diameter would be sufficient to carry away the worst expected rain water conditions and the proposed culvert is, in essence, a tube with an average diameter in excess of 13 feet. The large culvert would cause no change in the volume of water flowing through the canal. It might cause a de minimis headloss, which is a change in the water level from one side of the culvert to the other. Any such headloss would be on a magnitude of approximately 1/1000th of a foot; about 1/3 of a millimeter. The installation of the large culvert in the Coconut Creek Canal would actually increase the velocity of any water flow through the culvert. In conjunction with the installation of the large culvert, the depth of Coconut Creek Canal would be increased to an average of six or six and one-half feet from its present average of approximately five or five and one-half feet. Notwithstanding the decrease in the water quality of the portion of Coconut Creek Canal that parallels N.W 11th Street which apparently resulted from the unauthorized installation of the two earthen plugs, when the water in that portion of the canal was tested by the City's export witness some eight or nine months later, the water quality was within established state standards. And while the construction activity associated with the installation of the two 36-inch culverts in the College ditch effect on the water quality in Coconut Creek Canal, there is no evidence that water quality standards would be violated on either a short or long-term basis. A small amount of habitat would be destroyed, but it is likely that there would be rapid recolonization. No rare or endangered animal species would be affected. The habitat for birds would also recolonize and the birds and fish displaced by construction would return. Any turbidity problems during construction would be controlled by the use of turbidity screens. With regard to navigability, once installed the large culvert would provide a vertical clearance from the surface of the canal of approximately six feet. This clearance would prevent larger boats from passing through the culvert. The vertical clearance of existing canal bridges in the area varies from six and one-half to eight feet. Installation of the larger culvert would not seriously impede navigation. The large culvert would not constitute a navigational hazard nor would it impede the flow of navigable water. As compared to the situation which existed prior to the installation of the two earthen plugs, installation of the two 36-inch culverts would totally stop any boat traffic through the ditch that runs through the College. Nevertheless, curtailment of boat traffic through the College ditch would not seriously impede navigation because any destination which could be reached by traveling through the College ditch could be reached via alternative canal routes which are not affected by this project. As with the larger culvert, the 36-inch culverts would not constitute navigational hazards nor would they impede the flew of navigable water. If the total project envisioned by the College is completed, the culverts will provide a new route for motor vehicle access to an expanded College parking lot. The increased volume of motor vehicle traffic would produce an increased amount of air and noise pollution in the vicinity of N.W. 39th Avenue. A study of the results of the increased motor vehicle traffic based on a "worst case" scenario reveals that even with the additional air and noise pollution generated by the increased motor vehicle traffic, the air and noise pollution levels in the area would be far below the air and noise pollution standards established by the state and federal governments. In the formulation of the foregoing findings of fact I have, of necessity, relied to a large extent on the opinions of expert witnesses who testified in the case. Where there is conflict in the testimony of the expert witnesses, I have generally credited the testimony of the expert witnesses called by the College and the Department because I have found their testimony to be more consistent with other evidence in the case and have found that there is a better factual foundation in the record for their opinions than for the opposing opinions.

Recommendation For the foregoing reasons it is Recommended that the Department issue a Final Order which would GRANT the College's application to install two 36-inch culverts in the College ditch and a 14-foot, 1-inch, by 12-foot, 10-inch, culvert in the Coconut Creek Canal, subject to the conditions set forth in the Department's Notice of Intent to Issue. DONE and ORDERED this 8th day of October, 1984, in Tallahassee, Florida. MICHAEL M. PARRISH Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 8th day of October, 1984.

Florida Laws (1) 120.57
# 2
BOCILLA WATERWAYS, INC. vs. DEPARTMENT OF ENVIRONMENTAL REGULATION, 82-003485 (1982)
Division of Administrative Hearings, Florida Number: 82-003485 Latest Update: Mar. 12, 1985

Findings Of Fact The Petitioner, Bocilla Waterways, Inc., is a corporate entity formed for the purpose of pursuing the subject project and installing the proposed channel. Randall Craig Noden, secretary- treasurer of that corporation, and a director of it, is a realtor who sells and develops property on Don Pedro Island, in the vicinity of the proposed project. He and other officers and directors of the Petitioner corporation have an interest in property on some, but not all, upland areas adjacent to Bocilla Lagoon, Old Bocilla Pass and Kettle Harbor, the water bodies germane to this proceeding. The Respondent, State of Florida, Department of Environmental Regulation, is a state agency charged with regulating dredge and fill projects in state waters and navigable waters pursuant to Chapters 253 and 403, Florida Statutes, and Rule Chapters 17-3 and 17-4, Florida Administrative Code. The Intervenor, Environmental Confederation of Southwest Florida (ECOSWF), is an incorporated, not-for-profit organization whose membership includes numerous environmentally concerned public interest organizations or associations located throughout southwest Florida. Members of the Intervenor use Old Bocilla Pass, Kettle Harbor, Bocilla Lagoon and Lemon Bay, an adjacent contiguous water body, for boating, swimming, fishing (both recreational and commercial), and collecting shellfish. Some of the membership of the Intervenor live in the immediate area of the proposed project. Project Description The Petitioner submitted a dredge and fill permit application to the Respondent, DER, proposing excavation of an access channel through the uplands of Don Pedro Island and adjacent transitional and submerged lands. The channel would be 100 feet wide, 450 feet long and dredged to a depth of -5.0 feet mean low water, with 2:1 side slopes grading to 3:1 at approximately +0.5 feet NGVD. The channel below mean high water would be 70 feet wide' and 670 feet long to a depth of -5.0 feet mean low water, with 2:1 side slopes. A rip-rap strip five feet wide would be placed in the littoral zone on either side of the channel. As originally proposed, the channel excavation would be performed by dragline and clamshell with spoil placed upon uplands for disposal. The excavation would progress from the west side of the project to the east, with plugs remaining at the eastern terminus of the channel until it stabilizes and the rip- rap is placed along the excavated channel. A turbidity curtain is proposed to be used to maintain water quality above state standards regarding turbidity. The applicant originally proposed to transplant seagrasses, displaced in the excavation process, back into the bottom of the excavated channel. Earthen slopes above mean high water would be vegetated in order to achieve stabilization. Some of these proposals were modified after negotiations with DER staff, such that the seagrass transplanting portion of the project would be accomplished in surrounding areas of the water bottom of Bocilla Lagoon and Kettle Harbor, specifically, bare areas and otherwise degrassed, vegetated flats. The applicant also proposes to install navigation aides in Bocilla Lagoon and Kettle Harbor in order to help maintain boat traffic in the channel, and to facilitate ingress and egress through the proposed channel. Don Pedro Island is a barrier island lying off the coast of Charlotte County, Florida. The only access to the island is by boat or helicopter. Bocilla proposes to excavate the proposed channel in order to, in part, provide better navigational access to Bocilla Lagoon which lies within Don Pedro Island. There is presently a navigational channel in the Bocilla Lagoon through what is called "Old Bocilla Pass," located at the north end of Bocilla Lagoon and communicating with Lemon Bay. Bocilla contends that the channel is somewhat tortuous and subject to shoaling, with concomitant grassbed damage by boat propellers, and that thus, a better navigational access in the form of a shorter, deeper, more direct channel from the southern end of Bocilla Lagoon to Kettle Harbor is required. The project would involve the removal of approximately .18 acres of mangroves (red and black mangroves) and .187 acres of seagrasses. Bocilla has proposed to mitigate the damage involved in the mangrove and seagrass removal by replanting mangroves, on three foot centers, along both sides of the proposed channel, and replanting or transplanting seagrasses in bare areas of Kettle Harbor, near the proposed project. Description of Pertinent State Waters Bocilla Lagoon, Kettle Harbor and Old Bocilla Pass are designated as Class II, navigable waters of the state and are designated for shellfish propagation or harvesting. Shellfish, including clams and oysters, occur in Bocilla Lagoon, Kettle Harbor and Old Bocilla Pass. As demonstrated by Intervenor's witnesses Wade, Cole and Wysocki, shellfish are harvestable and harvested in Bocilla Lagoon and Kettle Harbor at the present time. Bocilla Lagoon, Kettle Harbor and Old Bocilla Pass have also been conditionally approved by DNR for shellfish harvesting. DNR approves or prohibits waters for shellfish harvesting, and as a matter of policy generally prohibits shellfish harvesting in manmade "dead-end" canals. A "conditionally approved" water body, such as those involved herein, is an area approved for shellfish harvesting, but one which is more likely to be affected by pollution events. Thus, they are monitored more closely by DNR. Such events as additional residential development in an area, resulting in more septic tank sewage discharge, on-board toilet discharges from boats or the installation of a water and sewer treatment plant, can result in DNR temporarily or permanently closing a conditionally approved area to shellfish harvesting. Natural phenomenon such as the influx of red tide is also a factor which is considered by DNR in electing to classify a shellfish harvesting area as conditionally approved, and in electing to prohibit shellfish harvesting in an area. It was established through testimony of witnesses Feinstein and Setchfield of DER that long-standing DER policy provides that when DNR conditionally approves waters as being shellfish harvestable, that means they are "approved" for all shellfish harvesting purposes, but simply subjected to closer monitoring and with an increased likelihood of closure due to immediate pollution events. Therefore, the prohibition in Rule 17- 4.28(8)(a), Florida Administrative Code, prohibits issuance of dredge and fill permits in areas approved for shellfish harvesting or "conditionally" approved, since there is no difference in the "shellfish harvestable" nature of the waters until a closure occurs, which may simply occur sooner in conditionally approved waters. Bocilla Lagoon and Kettle Harbor are both naturally- formed water bodies, although some dredging has been allowed to occur in them in the past. They are not manmade, "dead-end" canals. Neither water body has the physical or biological characteristics of a "typical dead-end canal". Both are quite high quality habitats for the natural flora and fauna occurring in the marine environment in that area, and thus the general policy of DNR established by witnesses Cantrell, Fry, Feinstein and Sperling which prohibits shellfish harvesting in manmade, dead-end canals, does not apply to Bocilla Lagoon and Kettle Harbor. The water quality in both bodies of water is good and within DER standards generally. At times however, the water quality in Kettle Harbor suffers from a failure to meet DER dissolved oxygen standards contained in Chapter 17-3, Florida Administrative Code. Indeed, the water quality in Bocilla Lagoon is generally somewhat better than the water quality in Kettle Harbor. Environmental Impacts The project as currently proposed would result in the removal of approximately .18 acres of mangroves and .18 acres of seagrasses. Seagrasses and mangroves are important in providing areas of cover, food, and habitat for various estuarine species. Seagrasses serve to stabilize marine soils resulting in a decrease of suspended solids in contiguous waters with resulting decrease in turbidity in those waters. The loss of seagrasses can result in de- stabilization of the bottom sediment, such that suspended solids or turbidity increases in involved waters, which can result in decreased light penetration to the vegetated bottoms. Decreased light penetration, if of a sufficient degree, can result in the further loss of seagrasses and other bottom flora, causing in turn, increased turbidity and further decreased light penetration, with progressively destructive results to seagrass beds and other marine flora and fauna, with a substantial detrimental effect on the marine biological community in general. Mangroves serve as biological filters, trapping sediments, heavy metals, nutrients and other pollutants, uptaking them through their roots and converting them to usable plant food and thus filtering such harmful elements from state waters and rendering them into environmentally harmless substances. The removal of the mangroves at the proposed channel site will result in a loss of their beneficial effects. These beneficial effects will be absent for a greater period of time than it takes to merely plant replacement mangrove plants, since mature trees will be removed and mangrove seedlings will be replanted in their stead. Maturation of mangroves at this location would take in excess of three years, thus replacement of the beneficial filtering effects of the removed mangroves will take in excess of three years, to which time must be added the time which lapses between the original mangrove removal and the replanting of the seedlings, which would start the maturation period. Bocilla proposes to mitigate the removal of the mangroves by that replanting, as well as to transplant seagrasses removed from the channel site to other nearby areas currently bare of seagrass. Seagrass replanting is not a well-established practice. Compared to mangrove replanting, there is less experience, less information and a lower success ratio historically. Of the hundreds of dredge and fill projects occurring and approved throughout Florida, only three have involved replanting of removed seagrasses. Two of the projects involved the Port of Miami in Dade County and the "New Pass site" in Sarasota County. In both of these cases, seagrass replanting cannot be termed successful. The Port of Miami project resulted in a final survival rate of only twelve per cent of ,the grasses replanted. The New Pass project thus far has resulted in a survival rate of only 39 per cent of the seagrasses replanted, after only nine months. The Petitioner proposes that the replanting be accomplished by Mangrove Systems, Inc. That firm is headed by Robin Lewis, who oversaw the seagrass replanting project at the New Pass area in Sarasota. The location and method of replanting seagrasses at New Pass, as to water depth, type of bottom, type of grass and planting method, was generally similar to that proposed for the Bocilla project. That is, it would be accomplished by "plug planting," of "bald" spots at generally the same latitude and similar water depth. The survival rate at the end of six months at the New Pass project was 73 per cent. The survival rate at the end of nine months was 39 per cent. Mangrove Systems, Inc. and Mr. Lewis acknowledges that it is difficult to attribute the decrease in survival rates and grass shoot densities to any one cause, but that predation and a shift in sediments due to the vagaries of water currents, were probably the chief causes for the decrease in seagrass survival. Mangrove Systems, Inc. and the Petitioner propose a guarantee whereby Mangrove Systems, Inc. would replant more seagrasses, if needed, if a low survival rate occurs, which it defines to mean less than a 70 to 80 per cent survival rate after one or two years. There is no guarantee concerning the survival rate after a second planting, however. It was not established when the survival rate will be measured, in determining whether a 70 to 80 per cent survival is being achieved. In this connection, the central Florida coast where the Bocilla project is proposed, is not as conducive to seagrass growth as other more tropical marine areas, such as in the Florida Keys. In the area of the proposed project, seagrasses do not generally produce a great deal of seed and tend not to grow back very readily, once they are destroyed. Seagrasses in the Florida Keys tend to have, in comparison, much greater seed production and for this and other reasons, tend to reproduce themselves more readily once destroyed. They tend to be more amenable to transplanting in the Florida Keys marine environment. Mangrove Systems, Inc. has conducted a seagrass replanting project in the Florida Keys, however. One-third of the seagrasses planted in that project have not survived after two years. In short, the likelihood of seagrass survival has been insufficiently tested in the geographical area and latitude and in similar soils, water depths and temperatures as those involved in the instant case, such that reasonable assurance of adequate seagrass survival with the replanting project proposed will occur. Hydrographics and Maintenance Dredging The evidence is uncontradicted that the opening of the proposed channel would increase circulation in the southern end of Bocilla Lagoon. Increased circulation tends to have good effects in that it reduces stratification in water bodies. Stratification is a condition which occurs when the deeper waters of a given water body do not interchange with surface waters, but rather stratify or become characterized by layers of differing levels of dissolved oxygen, temperature, pH, etc. Typically, lower levels of a stratified body of water are characterized by low levels of dissolved oxygen. The present water quality of Bocilla Lagoon however, is not characterized by statification in any significant degree. It is very similar in water quality, in terms of dissolved oxygen, temperature, pH and other Chapter 17-3 water criteria, to that water quality of the nearby intra-coastal waterway into which the channel into and through Kettle Harbor would open. The intra-coastal waterway is agreed to be a well- circulated body of water, meeting all current State water quality standards. Accordingly, the opening of the channel and the increased circulation it may cause in the southern end of Bocilla Lagoon would have minimal, positive benefits. The change in circulation and in water current patterns and velocities caused by the opening of the direct, shorter channel from lower Bocilla Lagoon and Kettle Harbor may, negatively affect the present seagrass growth in seagrass beds in Kettle Harbor and Bocilla Lagoon in the vicinity of each end of the proposed channel, due in part to increased current velocities that would result from tidal exchange through the shorter, straight channel which would be opened. The expert witnesses in the area of hydrographics disagreed on the effect of the proposed channel on water circulation in the northern end of Bocilla Lagoon and Old Bocilla Pass, which is the north channel opening into northern Bocilla Lagoon. Witness Sperling for the Department opined that a major reduction in flows through Old Bocilla Pass channel would occur. Witness Tackney for the Petitioner acknowledged there would be some reduction in flow, and witness Olsen opined that a reduction in flow would occur, but there could also be an increase in circulation. Both witnesses Tackney and Olsen, in opining that a flow-through, enhanced circulation and flushing system may result from installing the channel, based that opinion to a significant degree, on their belief on the effects of wind on forcing water through the Pass and Bocilla Lagoon. No wind data or records were adduced however, to show the likely effects of wind on creating the Petitioner's desired "flow-through" system. Witness Sperling disagreed as to the significance of this flow-through effect, but there was no disagreement among the hydrographic experts that reduced flows through Old Bocilla Pass, which all acknowledged can occur to one degree or another, can result in increased sedimentation in Old Bocilla Pass, which can result in turn, in the need for increased maintenance dredging in Bocilla Lagoon and Old Bocilla Pass in the future. Maintenance dredging in Old Bocilla Pass may have to be increased if the proposed channel is constructed. The proposed channel itself will likely have to be periodically maintenance dredged as well. Maintenance dredging can cause environmental problems. Dredging activities result in the loss of marine habitat and the destabilization of marine sediments, with resulting increased turbidity and reduced photic effects, with concomitant detrimental effects on seagrasses and other bottom flora and fauna. Increased turbidity resulting from dredging and destabilization of sediments can directly adversely affect shellfish, including clams and oysters. Dredging impacts and siltation can negatively affect seagrass growth and water quality by increasing turbidity resulting in reduced photosynthesis in seagrass, by smothering the seagrass directly and by silting fauna and vegetation in adjacent productive grassbeds. Persons other than the officers and directors of Bocilla Waterways, Inc. own property and have riparian rights on the Old Bocilla Pass channel. These persons have in the past, and have the right in the future, to use Old Bocilla Pass for navigational purposes and could elect to maintenance dredge Old Bocilla Pass as they have in the past. If the proposed channel is constructed, there is obviously a more direct access and shorter water route between the waters of Bocilla Lagoon and Kettle Harbor. Water quality at times in Kettle Harbor has been worse than that in Bocilla Lagoon, especially in terms of low dissolved oxygen. If poorer water quality exists in Kettle Harbor due to low dissolved oxygen, an influx of red tide or some other cause, the construction of the proposed channel would increase the chance, by the more direct connection and increased flow in the southern end of Bocilla Lagoon, to contaminate the water of Bocilla Lagoon. The Public Interest Public opposition was expressed at the hearing, including that of ECOSWF, the Intervenor, some of whose members include people who live in the area of the proposed channel and use the involved waters. Local fishermen who harvest shellfish and finfish in Bocilla-Lagoon and Kettle Harbor, and use Old Bocilla Pass for navigation between Lemon Bay and Bocilla Lagoon, oppose the project, some of whom are members of the organized Fishermen of Florida, an association of approximately 25,000 members. Residents of Bocilla Lagoon and the immediate area, who habitually navigate Old Bocilla Pass, including local fishermen, have had little trouble navigating Old Bocilla Pass because they are familiar with the channel. Although the Petitioner alleges that the new channel is needed in part for the safety of people living on Bocilla Lagoon to assure quick access to the mainland in case of medical emergencies, the members of the public living on Bocilla Lagoon, (with one exception) and on surrounding areas of the island, do not wish such increased access for medical purposes. The island is presently reached from the mainland by either watercraft or helicopter. Formerly, there was a bridge connecting the island with the mainland which has since been destroyed, and not rebuilt. The residents living on Bocilla Lagoon, either full- time or part-time, buy their homes and choose to live there with knowledge of the present mode of access through Old Bocilla Pass, which is also the means they would achieve access to the mainland in case of medical emergencies or, alternatively, by helicopter transport or by transport over island roads to the ferry landing, with access to the mainland by ferry. The residents, in general, desire to maintain the isolation of life on the island as it presently exists and do not desire enhanced access between the island and the mainland, since part of the charm of having homes and living on the island is its isolation from the more populous mainland. Other than the testimony of Petitioner's witnesses, there was no testimony presented expressing any public need for the proposed channel, as for instance from public officials having knowledge of any medical or public health need for enhanced access to Bocilla Lagoon and the island. The proposed project is contrary to the public interest due to its adverse effects on seagrasses, shellfish, and water quality as delineated above. The adverse effects on seagrasses would result from the dredging itself and the destruction of a portion of the extant seagrass beds, and the resultant likelihood of poor survival rates in the attempted transplanting of seagrass as a replacement for that destroyed by the channel dredging. The proposed project is not in the public interest of those people with riparian rights on Old Bocilla Lagoon and northern Bocilla Lagoon, as there is substantial likelihood the proposed project will reduce flows through Old Bocilla Pass' channel with the resultant increased settling out of sediment and thus increased shoaling of that channel, which would concomitantly increase the need for maintenance dredging in Old Bocilla Lagoon and channel. Additional maintenance dredging and the possible negative effects of such additional dredging on marine, flora and fauna in Bocilla Lagoon and Old Bocilla Pass constitute an additional burden on these riparian owners, the bearing of which is not in their interest. The proposed project is also contrary to the public interest in that the proposed channel is deeper, wider and more direct as an entry into Bocilla Lagoon from Kettle Harbor and Lemon Bay, and would thus allow larger, deeper draft boats to enter Bocilla Lagoon with concomitant increased pollution from oils, greases and possible discharge of onboard sewage, which could have adverse environmental impacts on water quality in Bocilla Lagoon, as well as Kettle Harbor. The use of deeper draft, larger boats with larger propellers and more powerful engines could also result in damage to adjacent grassbeds in the vicinity of either ends of the proposed channel, either through direct propeller contact or through prop wash, when such boats are navigated in areas minimally deep enough to accommodate their draft. Since the installation of the proposed channel would result in a deeper, more readily used access to Bocilla Lagoon by larger boats with the remaining original channel usable also, at least for a time, there is a-substantial likelihood of increased residential development on riparian property around Bocilla Lagoon. This could have the result of reducing water quality in the lagoon, or potentially so, through septic tank leachate, stormwater runoff and other adverse environmental effects, such that the water in the lagoon traditionally approved for shellfish harvesting may be prohibited in the future.

Recommendation Having considered the foregoing Findings of Fact, Conclusions of Law, the evidence of record, the candor and demeanor of the witnesses and the pleadings and arguments of the parties, it is, therefore RECOMMENDED: That a Final Order be entered by the Department of Environmental Regulation denying both the variance application and the permit application sought by Bocilla Waterways, Inc. DONE and ENTERED this 24th day of January, 1985 in Tallahassee, Florida. P. MICHAEL RUFF Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904)488-9675 FILED with the Clerk of the Division of Administrative Hearings this 24th day of January, 1985. COPIES FURNISHED: Kenneth O. Oertel, Esquire Segundo J. Fernandez, Esquire 646 Lewis State Bank Building Tallahassee, Florida 32301 Douglas H. MacLaughlin, Esquire Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32301 Thomas W. Reese, Esquire Environmental Confederation of Southwest Florida 123 Eighth Street, North St. Petersburg, Florida 33701 Victoria Tschinkel, Secretary Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32301

Florida Laws (5) 120.56120.57403.088403.201403.813
# 3
DR. AND MRS. HOWARD SHERIDAN, MARGARET MARINO vs. DEEP LAGOON MARINA AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 88-004759 (1988)
Division of Administrative Hearings, Florida Number: 88-004759 Latest Update: Apr. 14, 1992

Findings Of Fact Background Respondent, Deep Lagoon is the owner and developer of real property contiguous to state waters in the Caloosahatchee River at Fort Myers, Lee County, Florida. When Deep Lagoon purchased the property in 1980, the marina had been in existence for an extended period of time. An aerial photograph (Petitioner's Exhibit 18) shows a marina at this location in February 1966. The owners of Deep Lagoon represented at hearing that there are photographs of a marina in this location in 1955. The present owners have improved the facilities and continue to operate a full service marina on site. The existing site plan (Deep Lagoon's Exhibit 3) shows that the project contains three canals: the northern canal, main canal, and southern canal. There is a basin at the eastern end of the main canal. The uplands beyond the northern canal are part of a residential development known as the "Town and River" area. The finger peninsula between the northern and main canal is known as the east-west peninsula. The smaller land area northeast of the southern canal and south of the basin is referred to as the marina dealership and boat storage area. This last area is adjacent to McGregor Boulevard. The marina waters are designated as Class III waters by the state. Deep Lagoon Marina is in Deep Lagoon, a natural, mangrove-lined, deep channel in the south shore of the river. The three canals which are part of the marina, are the result of historic dredge and fill activity which created most of the uplands west of McGregor Boulevard. Except for the Iona Drainage District ditch which discharges into the northern canal, the canal water system is a dead-end system with little circulation from a hydrographic standpoint. Generally, the water sloshes back and forth within the canal system. As a result of poor water circulation within the system, sediments have built up in the canal bottoms and in the basin. Although different historical incidents, such as ship building, the burning of a large building on the east- west peninsula and the receipt of agricultural and highway drainage into the northern canal, may have caused some of the build-up, marina activities and the use of the canals for marina purposes have contributed significantly to the problem. Water quality samplings within the canals and basin indicate that State Water Quality Standards are currently being violated for dissolved oxygen, oils and greases, total and fecal coliform, copper, lead, mercury and tributylin. Sediments in the canals and basin are contaminated by lead, copper, cadmium, chromium and mercury. The canals and basin are currently devoid of seagrasses, oyster beds and benthic organisms. The West Indian Manatee, an endangered species, inhabits the Caloosahatchee River. Manatees are frequently seen in the Deep Lagoon area and are found within the northern canal of Deep Lagoon Marina. Since the marina was purchased by its current owners, maintenance of the property has improved. The management has demonstrated a responsible approach to many environmental concerns that are usually associated with marinas. For example: Gas attendants pump fuel to reduce gasoline spillage. The marina's mechanical work is confined to one area in order to maintain clean up controls. Boat cleaning is done with water only. Boats are repainted with a low copper-based paint to reduce the harmful effects of paint leaching on water quality. On December 9, 1986, Deep Lagoon applied to DER for a permit to renovate and expand the existing marina operation. The application was completed on March 7, 1988. The application, Deep Lagoon's Exhibit 1, consists of a proposal to: (1) rehabilitate the existing 61 wet slips and construct 113 new wet slips, which include 14,440 square foot of docks and boardwalks in the northern and southern canals, as well as the main basin; 2) excavate material for a circulation channel between the main basin and northern canal; 3) dredge contaminated sediments from the canals and the basin; and 4) place clean fill material within the canals and basin to replace the dredged fill, and to create a more shallow canal system for circulation and flushing purposes. In addition to the proposals initiated by Respondent Deep Lagoon, the Intent to Issue requires Deep Lagoon to: 1) construct a stormwater treatment system; 2) redesign and construct the boat wash area so that all runoff is directed to a collector and filtering system; 3) relocate and upgrade existing fuel facilities; 4) install an oil/fuel containment system; and 5) install sewage pumpout facilities. To alleviate concerns about the proposed project's effect on manatees, Respondent Deep Lagoon has worked with state and local governments to develop a manatee protection plan for the surrounding portions of the Caloosahatchee River. The Department of Natural Resources reviewed the plan, and recommended issuance with the restriction that the use of the additional slips be limited to sailboats until the manatee protection plan is enacted and enforced. The Respondent Deep Lagoon has agreed to accept all of the additional requirements and recommendations placed upon a dredge and fill permit by Respondent DER and the Department of Natural Resources. The Respondent DER has permitting jurisdiction under P.L. 92-500, Chapter 403, Florida Statutes, and Rule 17-12.030, Florida Administrative Code. Deep Lagoon constitutes waters of the state over which DER has dredge and fill permitting jurisdiction. In its review of Respondent Deep Lagoon's application for a dredge and fill permit, Respondent DER applied Section 403.918(2)(b), Florida Statutes, which provides that where existing ambient water quality does not meet standards, a permit may be issued if the applicant can demonstrate that the project will cause a net improvement of the water quality for those parameters which do not meet standards. The conditions placed upon the permit allow Deep Lagoon to construct all of the additional boatslips requested in a one-phase construction project. Fifty-six of the additional wet slips can be occupied immediately. The types of boats placed in these slips will be determined by the outcome of the proposed manatee protection plan. If the plan is enacted and enforced, motorboats may be placed in these slips. Until this occurs, only sailboats can be placed in these slips. If water quality monitoring shows that there has been a significant net improvement at the end of a year of the additional wet slip use, the remaining 57 slips may be occupied. The results of the water monitoring will be compared with water quality tests to be taken before construction or renovation begins for baseline water quality study purposes. Water quality monitoring will continue for two years after the marina reaches 80 percent occupancy, or until a year after increased motorboat occupancy is allowed. If monitoring continues to show a net improvement in water quality over baseline conditions, the slips shall be considered permanent. If a net improvement is not demonstrated for either phase, Deep Lagoon is required to present a possible solution to DER. No remedial action shall be taken without DER approval. DER may require slip removal if other remedial action is not successful. The total cost to the marina for the expansion project is estimated to be about 3.7 million dollars. Net profit for the marina is expected to increase from one hundred and six thousand dollars ($106,000.00) to three hundred and fifty to four hundred thousand dollars ($350,000.00 to $400,000.00) annually. The Petitioners are the owners of single family homes within the "Town and River" area, which is adjacent to the north of the proposed expansion and renovation project. The Petitioners dispute the appropriateness of the Intent to Issue filed by Respondent DER on July 17, 1988. In support of their position, the Petitioners identified a number of areas of controversy which they contend should cause the Respondent DER to reverse its preliminary decision to grant the dredge and fill permit on this project. These areas of controversy are: Whether the proposed activity complies with the water quality requirements of Section 403.918(1), Florida Statutes, and the federal antidegradation regulation, 40 CFR Section 131.12, which the Petitioners contend is applicable to this case pursuant to the Clean Water Act water certification. Whether the proposed project complies with the public interest criteria set forth in Section 403.918(2)(a), Florida Statutes, and whether it will adversely affect the West Indian Manatee, an endangered species. Whether the proposed manatee plan and water quality mitigation proposal meet applicable statutory and rule criteria. Whether the proposed project will cause unacceptable and unpermittable cumulative impacts and secondary impacts, pursuant to Section 403.919, Florida Statutes and other applicable law. Whether DER can certify this project pursuant to 33 USC Section 1341 of the Clean Water Act when water quality standards will not be met in the waters of the Deep Lagoon Marina. Whether the permit condition of a "net water quality improvement" is a vague and unenforceable condition. The Intervenor has intervened in the Petitioner's formal administrative proceeding for a factual determination as to whether the proposed project will adversely affect the conservation of the West Indian Manatee by direct, secondary or cumulative impacts. Water Quality The testing results from the water quality samplings taken for purposes of permit application review, may not accurately represent the mercury number at all the sampling sites. The zinc number from the samplings taken in the northern canal (which receives discharge from the Iona Drainage District ditch) is so high that the number may not be an accurate representation of the zinc content in the water column at this location. The water samplings taken, and the future samplings to be taken for baseline purposes, do not take into consideration the following variables: a) that there are two distinct seasons in the area, wet and dry; and b) that the marina is not a completely closed, dead-end system. The Iona Drainage District ditch occasionally overflows or discharges into the northern canal. Expert opinion presented at hearing established that: a) baseline sampling should include control sites on the eastern side of the berm of the Iona Drainage District ditch, which is not owned by Respondent Deep Lagoon; and b) baseline samplings should be taken during the two seasons. Wet season samples should be compared against the wet season baseline, and dry season samples should be compared against the dry season baseline. Short term water quality impacts of the proposed project include the potential for limited turbidity generated by dock construction, excavation of the contaminated sediments and circulation channel, and the shallowing of the canals. The installation and use of turbidity curtains around the entire construction area during the construction, dredging, and shallowing should limit the short term violations regarding water turbidity. The overall increase in water quality which will be gained upon the removal of contaminated sediments in conjunction with the creation of a better flushing system within the marina complex, is in the public interest and far outweighs any temporary impact on turbidity, which will be minimized by the turbidity curtains. Oils and Greases It is impossible to determine all of the source of oil and greases found in the waters surrounding Deep Lagoon. Stormwater from the uplands area may bring oil and greases into the northern canal waters from the Iona Drainage District ditch, which appears to receive stormwater runoff from the adjacent highway and the fueling facilities at the adjacent 7/Eleven Store. However, historic fueling operations at the marina site, and the current marina operations have contributed significantly to the accumulation of oil and greases in the entire canal system. The proposed stormwater treatment system at the marina, which has already been permitted, is expected to reduce the amount of oils and greases which will enter the waters from the marina site. The runoff from the land operations, such as boat fueling, servicing and boat washing, and automobile parking, will be directed into various collectors for treatment within a stormwater treatment system prior to discharge into the waters of Deep Lagoon. The designer of the system anticipates that the amount of oils and greases entering the waters of the land operations will be reduced by 90-95 percent. It has not been determined if the new cut in the easterly portion of the east-west peninsula will affect the water exchange between the northern canal, the basin, and the Iona Drainage District ditch. Total and Fecal Coliform The total and fecal coliform in the waters of Deep Lagoon Marina are due primarily to the presence of these pollutants in the stormwater runoff from upland areas of the marina facility. Other potential sources of total and fecal coliform are improperly functioning septic tanks and drainfields at the marina facility, and discharges from marine toilet facilities on boats using the marina. Deep Lagoon will install an on-site central sewage collection and transmission system that will eliminate the use of the septic tanks and drainfields. All sewage from the collection and transmission system will be discharged into the system of a private utility company for treatment off-site. Deep Lagoon is required to install a sewage pumpout facility for use by boats with marine toilet facilities, thereby minimizing discharges from these on board toilet facilities into the waters of the marina. In addition, every boat slip occupied by a liveaboard vessel at the marina will have a permanent direct sewage connection to the central sewage collection system. As a result of the construction of the stormwater treatment system, the elimination of the septic tanks and the construction of a central sewage system, and the installation of sewage pumpout facilities, there will be a reduction in the levels of total and fecal coliform in the waters of Deep Lagoon Marina. Copper The principal source of cooper in the waters of the Deep Lagoon Marina is runoff from the boat cleaning and painting operations at the marina facility. An additional significant source of copper to these waters is the bottom sediments which are highly enriched with copper from past marina operations at this location. Copper and other metals, including lead and mercury, enter the water column through leaching from the sediments and the suspension of the bottom sediments caused by the movement of boats within the marina. Minor sources of copper to these waters include brass or bronze fittings on vessels and leaching from antifouling bottom paints of boats and treated pilings used to construct docks. Pursuant to the Intent to Issue, Deep Lagoon is required to hydraulically dredge the top six to twelve inches of contaminated sediments from substantial portions of the northern and southern canals and the main basin. Due to the construction of the stormwater treatment system and the removal of the contaminated bottom sediments, there will be a reduction in the levels of copper in the waters of Deep Lagoon Marina. However, this will occur only if the copper does not return to the water through a leaching process caused by soft rainwater. Limestone, or calcium carbonate is necessary in the stormwater treatment soil to prevent leaching. Such conditions were not demonstrated at hearing. The anticipated increased levels of dissolved oxygen in these waters will also decrease copper concentrations in the water column by increasing the tendency for dissolved copper to become insoluable, settle out and become trapped in the sediments. This reduction in copper concentrations will offset any minor increased loading of copper concentrations through leaching from the bottoms of the additional boats expected to utilize the expanded marina. Lead The primary source of lead to these waters is from past use of leaded gasoline and its residues, which enter the water from stormwater runoff. It is impossible to determine all of the sources of the stormwater runoff due to the entry of the Iona Drainage District ditch into the northern canal during certain stormwater events. Lead also enters the water column of these waters from the contaminated bottom sediments. As a result of the construction of the stormwater treatment system, the dredging of the contaminated bottom sediments, and the reduction in use of leaded gasoline, by all boaters and automobiles, there will be a reduction in the levels of lead in the waters of the Deep Lagoon Marina. Mercury Other than the contaminated sediments themselves, there is no apparent source of mercury in these waters. The removal of the contaminated sediments will result in a reduction in the levels of mercury found in these waters. Zinc Even if the water quality data for zinc at the one sampling station previously mentioned is accurate, the construction of the stormwater treatment system, and the dredging of contaminated bottom sediments should cause a net improvement in the quality of these waters by reducing the zinc content. Dissolved Oxygen The decreased levels of dissolved oxygen in the waters of Deep Lagoon Marina are due principally to biochemical oxygen demanding substances that enter the water column from stormwater runoff. The runoff is mainly from the marina uplands, but also includes the Iona Drainage District ditch. Contaminated sediments also exert biochemical oxygen demands on the water column of these waters. The discharge points of the stormwater treatment system will be constructed so as to produce a cascading effect on the discharged water. This cascading effect will introduce additional dissolved oxygen to the waters of Deep Lagoon Marina. Deep Lagoon is required to excavate a circulation channel to connect the northern canal and the main basin. Deep Lagoon is also required to shallow the northern canal -5.6 ft. NGVD and the southern canal and main basin to -.6.6 ft. NGVD. The excavation of the flushing channel and the shallowing of these waters will improve the flushing of the water circulation of the Deep Lagoon Marina. The construction of the stormwater treatment system, the cascading effect of the stormwater discharge points, the removal of the contaminated sediments, the excavation of the circulation channel, and the shallowing of the canals and basin will result in a net improvement in the levels of dissolved oxygen in the water of Deep Lagoon Marina. Tributyltin Tributyltin is a toxic compound formerly used in paints used to maintain the bottom of boats. Levels of tributyltin in the waters of the Deep Lagoon Marina are in violation of the state "free-form" standards. The proposed project, with all the required modifications will result in a reduction in the levels of tributyltin in these waters. When the sediments are dredged from the marina bottoms, samples need to be subjected to an EPA toxicity test to determine whether the sediments have become hazardous through the dredging process. If the sediments have become hazardous, they must be disposed of through a hazardous waste facility. If the fill material used to shallow the marina bottoms comes from the area excavated for the flushing channel, this soil should be tested to determine if it is "clean fill." The area where the cut will be made has been used for boat sanding in the past, and may contain contaminated materials. The evidence presented at hearing has demonstrated that the dredging, the new water circulation and flushing design for the marina, and the stormwater treatment system will cause a net improvement in water quality once renovation and expansion of the marina is completed. The effect of stormwater discharge from the Iona Drainage District ditch into the northern canal is not known at this time. The effect of the new water circulation and flushing patterns on the berm between the drainage ditch and the northern canal is not known at this time. Public Interest Standard - Section 403.918, Florida Statutes Regarding the criteria listed in Subsection 403.918(2), Florida Statutes, the parties have stipulated as follows: The proposed project will not adversely affect navigation or the flow of water or cause harmful erosion or shoaling. The proposed project will be of a permanent nature. The project will not adversely affect significant historical or archaeological resources. The evidence shows that the adjacent waters of the Caloosahatchee River support manatees year round with a large over-wintering population. The Caloosahatchee River has been designated as critical habitat for the West Indian Manatee, an endangered species. The Department of Natural Resources Bureau of Marine Resources studies have shown that approximately twenty- five percent (25%) of manatee deaths are due to boat collisions. The proposed expansion of this marina would increase boat traffic in an area of heavy manatee usage. It was established that manatees are found more often in the shallower areas of the river, outside of the main channel. Deep Lagoon has been instrumental in providing manpower and financial resources for the preparation of the Caloosahatchee River Boat Operation and Manatee Protection Plan. The principal goal of the plan is to protect the manatee in the Caloosahatchee River by regulating the speed of boats outside the marked channel and a buffer zone of the Caloosahatchee River. (Deep Lagoon Exhibit 5). The plan has received support from the Department of Natural Resources, and is currently being reviewed by the Lee County Board of County Commissioners for preparation of the plan. Pursuant to DER's Intent to Issue, the plan is to be considered a part of the proposed permit. Occupancy of the additional 113 wetslips is restricted to sailboats until such time as the plan is implemented and enforced on the Caloosahatchee River. Upon demonstration to the Department that the plan is being implemented and enforced, Deep Lagoon may increase the powerboat occupancy of the marina up to a maximum of 75 percent of the total allowed occupancy. It was established that one of the principal threats to manatees is from fast moving powerboats. By controlling the speed of boats in those areas where manatees are most frequently found, the river can tolerate more boats and still not harm the manatees. Without the implementation and enforcement of the plan, the proposed project with its projected increased number of boats would likely result in an increase in the number of boat kills of manatees if the additional boats are powerboats. However, if the plan is implemented and enforced, the proposed project at Deep Lagoon, including additional upland storage of boats, will not have negative impact on the manatee, even when considering the cumulative impacts of other existing and proposed boating facilities. If only sailboats are allowed in the additional slips, the proposed project will not negatively impact the manatee population. In addition to the plan, through the conditions of the Intent to Issue, Deep Lagoon has agreed to enter into a long-term agreement to limit powerboat occupancy at the marina to a maximum of 75% of the total 174 wetslips. Deep Lagoon has also agreed to operate all vessels associated with the construction of the project at "no wake/idle" speeds at all times while in water where the draft of the vessel provides less than three feet clearance from the bottom and has agreed that vessels will follow routs of deep water whenever possible. Deep Lagoon has agreed that all construction activities in open water will cease upon the sighting of manatees within 100 yards of the project area. Construction activities will not resume until the manatees have departed the project area. Deep Lagoon has agreed to install and maintain manatee awareness signs at permanent locations within the construction area. Furthermore, Deep Lagoon has agreed to establish and maintain an educational display at a permanent location to increase the awareness of boaters using the facility of the presence of manatees, and the need to minimize the threat of boats to these animals. In addition to the above, Deep Lagoon has agreed to make available: (a) one wetslip for use by the Florida Marine Patrol; (b) one dry slip for the Lee County Sheriff's Department; and (c) upland space for the Coast Guard Auxiliary. Cumulative and Secondary Impacts There is no affirmative evidence in the record concerning the consideration given to existing and proposed marina projects in the Caloosahatchee River by DER in its review of Deep Lagoon's application for a permit. However, conditions placed in the permit which require sailboats only in the additional boatslips, along with educational displays regarding manatees, necessarily imply that the cumulative and secondary impact review took place.

Recommendation Based upon the findings of fact and conclusions of law, it is RECOMMENDED: That the Respondent, Department of Environmental Regulation, grant the applicant, Deep Lagoon Marina, a dredge and fill permit, pursuant to the Notice of Intent to Issue dated July 26, 1988, in File No. 361279929, provided that the following additional conditions are incorporated into the permit as mandatory conditions: Baseline water quality samples include a sample site east of the berm between the Iona Drainage District ditch and the northern canal and assure that future water quality decline is not caused by discharge into the northern canal from the drainage ditch. A multiple baseline sampling shall be taken, consisting of one wet season and one dry season baseline. Comparative reviews shall be done of future wet season samples against the dry season baseline. When sediments are dredged from the marina bottoms, samples from each canal and the basin are to be subjected to an EPA toxicity test to determine whether the sediment is hazardous, and requires disposal at a hazardous waste facility. If the fill material used to shallow the marina bottoms comes from the area excavated for the flushing channel, it is to be tested to determine that it does not contain contaminated materials which will reduce the improvement in water quality gained from the dredging process. If the manatee protection plan ultimately adopted within the river is different than the plan referenced in the Intent to Issue, Deep Lagoon may not increase its power boat usage unless a permit modification is approved by the DER. If a manatee protection plan is not adopted and enforced, the additional slips should be occupied only by sailboats until such time as the manatees are actually granted protection. Limestone shall be placed within the stormwater treatment system if the available soils are deficient in the calcium carbonate to be used to precipitate copper back out of the stormwater discharge system. DONE and ENTERED this 11th day of July, 1989, in Tallahassee, Leon County, Florida. VERONICA D. DONNELLY Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904)488-9675 Filed with the Clerk of the Division of Administrative Hearings this 11th day of July, 1989. APPENDIX TO RECOMMENDED ORDER IN CASE NO. 88-4759 Petitioners' and Intervenor's proposed findings of fact are addressed as follows: Accepted. Accepted. Accepted. Accepted. See HO #1. Accepted. Accepted. Accepted as to state water quality standards only. See HO #5. The rest is irrelevant for state permit review purposes. Accepted. See HO #5 and answer to paragraph 7 above. Accepted. Accepted. Rejected. Contrary to fact. See HO #4. Rejected. Unknown until water samples taken in the Iona Drainage District ditch. See HO #3. Accepted. Accepted. See HO ?#26 and #27. Accepted. Accepted. See HO #27. Accepted. Rejected. Conclusionary. Rejected. Contrary to fact. Rejected. Conclusionary. Unknown due to Iona Drainage District ditch. See HO #3. Rejected. See HO #26. Accept, that the sources are the same. The rest is rejected. See HO #26. Rejected. See HO #23. Accepted. See HO #23. Rejected. Conclusionary. See HO #23. Accepted. See HO #31. Accepted. Accepted. Rejected. See HO #32. Accepted. Rejected. Conclusionary. Rejected. Conclusionary. Reject, that batteries are a source of lead. Conclusionary. See HO #36 and #37. Rejected. See HO #36. Rejected. See HO #39. Accepted. See HO #42. Accept as to the majority of violations, except contaminated sediment. See HO #42 and #43. Accepted. See HO #5. Accepted. Reject. Legal conclusion. Reject. Conclusionary. Reject. Legal conclusion Reject. Legal conclusion. Accept. Accept. Reject. Legal conclusion. Accept. Reject. Legal conclusion. Accept. Reject. Legal conclusion. Reject. Legal conclusion. Accept. Accept. Accept. Reject. Legal conclusion. Reject. See HO #21. Reject. Legal conclusion Reject. Speculative. Accepted. See HO #3 Accepted. Rejected. Conclusionary. Rejected. Conclusionary. Rejected. Irrelevant. See HO #44 Accepted. See HO #6. Accepted. Accepted. See HO #52. Accepted. Accepted. Accepted. Accepted. Reject the reasons the canal is in use. Speculative. Accepted. Accepted. Accepted. Reject the arithmetic calculation of 18 fatalities. The rest is accepted. Accepted. Reject the major premise. Conclusionary. Accepted. Accept that the plan does not include San Carlos Bay. Reject the rest as conclusionary. Reject. Conclusionary. Reject. Legal conclusion. Reject. Conclusionary. Reject. Legal conclusion. Accepted. Rejected. Conclusionary. Accepted. Reject. Conclusionary. Reject. Conclusionary. Accepted. Accepted. Accepted. Rejected. Speculative. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Rejected. See HO #56. Rejected. See HO #56. Accepted. Rejected. Not established at hearing. Rejected. Conclusionary. Contrary to evidence at hearing. See HO #56. Accepted. Accepted. Reject. Legal conclusion. Rejected. See HO #57. Rejected. See HO #57. Rejected. Conclusionary. All factors not considered. Rejected. Contrary to fact. Accepted. Accepted. Rejected. Improper summary. Accepted. See HO #60. Accept. Rejected. Legal conclusion. Rejected. See HO #57. Rejected. Conclusionary. See HO #57. Rejected. Speculative. Accepted. Rejected. See HO #32-#35. Accepted. See HO #49. Accepted. See HO #35. Accepted. See HO #49. Rejected. See HO #35. Rejected. Overbroad. Does not relate to specific types of storm events. Respondent Deep Lagoon's proposed findings of fact are addressed as follows: Accepted. See HO #1 and #8. Accepted. See HO #9. Accepted. See HO #2 and #12. Reject legal conclusion. The rest is accepted. See HO #5. Accepted. See HO #22. Accepted. See HO #5. Rejected. See HO #23. Accepted. See HO #23. Accepted. See HO #23. Accepted. See HO #24. Accepted. See HO #24. Accepted. See HO #24. Accepted. See HO #24. Accepted. See HO #26. Accepted. See HO #27. Accepted. See HO #28. Accepted. See HO #29. Accepted. See HO #30. Accepted. See HO #31. Accepted. See HO #32. Accepted. See HO #33. Accepted. See HO #34. Accepted. See HO #35. Accepted. See HO #36. Accepted. See HO #37. Accepted. See HO #38. Accepted. See HO #39. Accepted. See HO #40. Accepted. See HO #20. Accepted. See HO #41. Accepted. See HO #42. Accepted. See HO #43. Accepted. See HO #44. Accepted. See HO #45 Accepted. See HO #46. Accepted. See HO #47. Accepted. See HO #48. Accepted. See HO #14. Accepted. See HO #14. Rejected. Legal conclusion. Accepted. See HO #51. Accepted. See HO #52. Accepted. See HO #53. Accepted. See HO #54. Accepted. See HO #55. Accepted. See HO #56. Accepted. See HO #57. Accepted. See HO #58. Accepted. See HO #59. Rejected. See HO #60. Rejected. Conclusionary. Respondent DER's proposed findings of fact are addressed as follows: Accepted. See HO #1 and #8. Accepted. See HO #9. Accepted. See HO #12. Rejected. Legal conclusion. Accepted. See HO #5. 6. Accepted. See HO #24, #30, #35, #41, #44, #46 and #48. 7. Accepted. See HO #22 and #34. 8. Accepted. See HO #23, #26, #31, #36, #42 and #47. Accepted. See HO #23 and #24. Accepted. See HO #9. Accepted. See HO #35. Accepted. See HO #24, #30 and #35. Accepted. See HO #8, #22, #45 and #46. Accepted. See HO #28. Accepted. See HO #20 and #21. Accepted. See HO #14 and #15. First sentence accepted. See HO #5. The rest is rejected. Conclusionary. Accepted. See HO #51. Accepted. See HO #6 and #52. Accepted. See HO #53. Accepted. See HO #54. Accepted. See HO #55. Accepted. See HO #56. Accepted. See HO #57. Accepted. See HO #58. Accepted. See HO #59. Accepted. See HO #5 COPIES FURNISHED: Thomas W. Reese, Esquire 123 Eighth Street St. Petersburg, Florida 33712 Joseph W. Landers, Jr., Esquire Richard A. Lotspeich, Esquire LANDERS & PARSONS Post Office Box 2714 Tallahassee, Florida 32302 Richard Grosso, Esquire Assistant General Counsel Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Dale H. Twachtmann, Secretary Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32399-2400

USC (3) 33 U.S.C 131333 USC 134140 CFR 131.12 Florida Laws (2) 120.57403.087
# 4
PALMETTO POINT HOMEOWNERS ASSOCIATION vs. DEPARTMENT OF ENVIRONMENTAL REGULATION, 83-003488 (1983)
Division of Administrative Hearings, Florida Number: 83-003488 Latest Update: Apr. 02, 1984

Findings Of Fact On December 9, 1982, Petitioner filed with Respondent a dredge and fill permit application to remove gates and wing-walls from a double-lock canal system presently installed at the Palmetto Point Subdivision in Lee County, Florida, adjacent to the Caloosahatchee River. On January 6, 1983, Respondent sent a "completeness summary" to Petitioner, along with a letter advising Petitioner that its permit application was incomplete, and requesting additional information. Petitioner responded to the January 6, 1983, completeness summary by submitting additional information to Respondent on or about February 23, 1983. On March 21, 1983, Respondent sent a second completeness summary requesting further additional information from Petitioner. By letter dated May 18, 1983, Petitioner's attorney advised Respondent that submission of additional requested hydrographic information and water quality data was not justified. The letter further advised that Petitioner intended to rely on the information already submitted, and requested, pursuant to Section 403.0876, Florida Statutes, that Respondent begin processing the permit application. The letter further indicated that petitioner was submitting under separate cover a request that Respondent apply the "moderating provisions" of Rule 17-4.244, Florida Administrative Code, to the application. The aforementioned rule is entitled "Mixing Zones: Surface Waters." Also on May 18, 1983, Petitioner's counsel sent another letter to Respondent requesting the aforementioned "Mixing Zone." The letter requested the "maximum mixing zone" allowed under the applicable Provisions of Rule 17- 4.244, Florida Administrative Code. Petitioner had not requested a mixing zone be applied to the permit application prior to the request contained in its May 18, 1983, letter. By letter dated June 17, 1983 Respondent, in response to Petitioner's May 18, 1983, letters, advised that: The additional information [which] was received on May 19, 1983, was reviewed; however, the items listed on the attached sheet remain incomplete. Evaluation of your proposed project will continue to be delayed until we receive all requested information. Respondent's June 17, 1983, letter included a completeness summary, which asked for additional information, including the following requests concerning mixing zones: Your request for a mixing zone is applicable pursuant to F.A.C. Rule 17-4.244(6). Please provide a map indicating the outermost radius of the mixing zone (no more than 150 meters) and the period of time required. The completeness summary acknowledged Petitioner's refusal to supply additional information concerning hydrographic data and water quality information, and indicated that Respondent would evaluate the project accordingly. By letter dated August 29, 1983, Respondent advised Petitioner that it had been 73 days since notification of the incompleteness of the permit application with regard to the mixing zone request. This letter requested Petitioner to advise Respondent if it wished to withdraw the application, request additional time, or discuss questions regarding the application. The Petitioner did not respond to this communication. On September 9, 1983, Petitioner's attorney forwarded a letter to Respondent requesting a default permit pursuant to Sections 120.60(2) and 403.0876, Florida Statutes. Until this letter, other than a prior oral communication on September 2, 1983, notifying Respondent that the default request was forthcoming, Petitioner had not contacted Respondent concerning the permit application since its May 18, 1983, letters. On October 13, 1983, Respondent advised Petitioner by letter that the mixing zone request constituted a revision of the application and that the information received to evaluate the mixing zone request was incomplete. Petitioner was also advised that since the additional information requested had not been received, the application remained incomplete and Petitioner was not entitled to a default permit. Whether or not a mixing zone is applied to a permit application is significant because it determines where state water quality standards must be met, either adjacent to the proposed project, or up to 150 meters away from the project location. Under Rule 17-4.244(6), Florida Administrative Code, the 150 meter radius is measured from the point of generation of turbidity or pollution. Since the two locks to be removed were 80 feet apart, it was unclear whether Petitioner intended the point of generation for measuring the radius of the mixing zone to be the northern lock, the southern lock, or some other point. It is equally unclear whether Petitioner intended the mixing zone to extend south into the canal as well as north into the Caloosahatchee River. Petitioner never contacted Respondent to clarify the dimensions of the mixing zone being sought, even after Respondent requested a map indicating the outermost limits of the mixing zone in the June 17, 1983, completeness summary.

Florida Laws (3) 120.57120.60403.0876
# 5
INES D. DEGNAN AND EDWARD J. DEGNAN, KATHRYN CHIRINGTON AND DAVID R. CHIRINGTON, BRENDA B. JEFFCOAT, JANIS V. FARRELL, CAROL B. NEWTON AND ROGER K. NEWTON; CAROLYN VANDERGRAFF AND KENNETH VANDERGRAFF, EMIL DISANO, AND TAMMY SWAINE AND RUSSELL SWAINE vs JOSEPH TELESE AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 90-007035 (1990)
Division of Administrative Hearings, Florida Filed:Clearwater, Florida Nov. 05, 1990 Number: 90-007035 Latest Update: Jun. 28, 1991

Findings Of Fact Background Respondent Telese is the owner and developer of Egret Woods Subdivision on real property contiguous to state waters in Pinellas County, Florida. The property is near the incorporated areas of Indian Shores and Largo. A residential subdivision borders the project locale to the east, and tidal mangrove swamps fringe the property to the west. An intracoastal connecting waterway known as the "Narrows" lies to the west of the swamps. These state waters connect Boca Ceiga Bay and Clearwater Harbor. The proposed subdivision area is an upland strip between the existing subdivision and the tidal swamp adjacent to the "Narrows". The uplands are predominantly vegetated by live oak, saw palmettos and slash pines. In order to develop the property, and to reconfigure lots from a previously platted subdivision, Respondent Telese applied for a permit from DER to fill 0.12 acres of DER jurisdictional wetlands located at the development site. The application for the permit represents that 340 cubic yards of clean, non-deleterious sandy loam is needed to fill disturbed high marsh areas and other low areas on the proposed lots. Respondent Telese has also requested permission to install culverts in the two conveyance/mosquito ditches that run through the lots before they reach their discharge points outside of the proposed lot lines. The Petitioners are owners of single-family homes within the subdivision to the east known as Whispering Pines Forest, 5th Addition. These property owners filed a Petition in which they disputed the appropriateness of the Notice of Intent to Issue filed by DER on August 21, 1990. In support of their position, the Petitioners identified a number of areas of controversy they contend should cause DER to reverse its preliminary decision to grant the "dredge and fill" permit on this project. Elimination of Natural Drainage The first area of controversy is the Petitioners' contention that their interests are substantially effected by the elimination of natural drainage from their subdivision into the uplands referred to as Egret Woods Subdivision. The entire area was owned by the same developer prior to the creation of Whispering Pines Forest 5th Addition. Essentially, the Petitioners allege that a subservient estate was created on these adjacent lands for their surface water drainage purposes which the proposed development eliminates. A review of the Notice of Intent to Issue reveals that culverts are to be placed in two of the open conveyance ditches currently transporting surface water runoff from Whispering Pines Forest 5th Addition through the uplands of Egret Woods into the wetlands. While this proposed change in the means of conveyance of the surface water may not affect the volume of water conveyed, it could adversely effect the quality of the water at the discharge points into the wetlands. At hearing, the Petitioners were unable to clearly articulate their concerns about this water quality issue. However, it is intricately interwoven into the surface water management issues. The water quality concern was obliquely referred to in the Biological and Water Quality Assessment Report where DER's application appraiser commented that the proposed conservation easements and the mitigation plantings, which replace the high marsh removed for lot reconfiguration, are sufficient to offset the potential adverse impacts of the requested fill and culvert changes to the existing water quality at the project site. Although this particular water quality issue was properly addressed by DER in its review of the permit application, it was not clearly set forth in the Notice of Intent to Issue. There is no way for a person whose substantial interests are affected by the proposed permitting decision to determine that DER had considered mitigation measures to prevent this adverse effect. A decrease in surface water quality would have been caused by the marsh elimination and the placement of culverts if the marsh had not been replanted, and other mitigative measures had not occurred at the locale. The Petitioners properly requested a formal administrative hearing to address surface water management issues as DER's consideration of the matter was not made clear to them in the Notice of Intent to Issue. The written report that discusses water quality as it relates to the mitigation plan was provided to Petitioner's post-hearing, after a copy of the written appraisal was sent to the Hearing Officer and all parties by DER. Planned Roadway The second area of controversy is the Petitioner's concern about the effects of the planned roadway on their properties. As the planned roadway involves the county, it is not a matter considered in the dredge and fill permit. Neither DER nor the Hearing Officer has subject matter jurisdiction. The Petitioners did not pursue this area of controversy or the road location at hearing based upon the Hearing Officer's ruling that it was not relevant to this permit review. High Water Mark and the Setting of the DER Jurisdictional Line The third area of controversy raised by Petitioners involves their collective concern about a variance in the height of the Mean High Water Line on the property on different documents presented to different agencies. The current survey for DER completed by the surveyor shows the Mean High Water Line at 1.16, while the survey submitted to Pinellas County in 1981 from the same surveyor reads the Mean High Water Line at 1.25. This was explained at hearing by the surveyor. It was his opinion as a professional surveyor that there is no basic difference between these two mean high water lines. Since the survey to the county in 1981, the Mean High Water Line has varied between 3 - 3 1/2 feet in some areas. The same methodology and simple mathematical formula was used by him during the two different surveys which were about eight years apart. The difference in the two surveys is within the tolerance level accepted within the industry and needs no further reconciliation. As a correlative issue, Petitioners raise a concern about the change in DER's jurisdictional line on various documents involving this same site over a number of years. DER's jurisdictional lines have changed since the "Hendersons Wetland Act" enacted on October 1, 1984. The jurisdictional line as depicted on this permit application was established by dominant plant species as defined in Rule 17-301.400, Florida Administrative Code, just prior to the application submission. This was the correct way to determine jurisdiction on the property at this particular point in time. Although the mean high water line may have been determinative of DER's jurisdiction on earlier permits, only the current law applies to the facts of this case. DER reviewed the jurisdictional lines as depicted on the property by Respondent Telese's consultant and found them to be properly placed during the processing of the permit application. Historical DER jurisdictional lines and permit reviews are irrelevant to this permit review as it is based upon the agency's current rules the applicable statutory criteria, and current site conditions. Fill Calculations The fourth area of controversy involves the Respondent's request to place fill on the site. When Petitioners used an engineer's scale to measure the areas to be filled on the permit drawings, their volume calculations reveal that more fill will be needed than represented on the permit application. Petitioners are concerned that this error could cause DER to approve a permit which does not accurately depict site conditions. The actual fill calculations were done by the professional engineer with a computer model based upon average elevations, depth and area. In his professional engineering opinion, his calculations were accurate, which was given great weight by the Hearing Officer. The drawings used by the Petitioners to calculate the required fill for the area were pictorial communications of what the Respondent Telese intended to accomplish at the site. These drawings were designed for descriptive purposes only and were not scaled to the extent that they could be accurately used for fill calculations in the manner applied by Petitioners. The computer modeling used by the professional engineer was the more prudent approach to the on-site fill requirements. De Novo Permit Review Although the wetlands resource permit requested by Respondent Telese is commonly referred to as a "dredge and fill" permit, there is no dredging associated with the project. The proposed placement of fill in the high marsh area of tidal wetlands on the property and the culvert placement requires construction activity in Class III Waters. Water quality impacts to the area will be a short term problem as water turbidity should take place only during construction. Specific conditions regarding construction techniques have been placed in the permit as permit conditions to minimize the impacts. There is no factual dispute as to whether the proposed conservation easement, the replacement and enlargement of the high marsh in another location, the removal of exotics such as Brazilian Pepper trees, and the planting of black mangroves will sufficiently mitigate the adverse impacts on water quality and the public interests at the proposed development. Without the replacement of the disturbed high marsh with high marsh plantings at a 1.91:1 ratio, the enhancement of the property through exotic removal, and the conservation easements at a 132:1 ratio, the Respondent Telese is unable to provide reasonable assurances that the project is not contrary to the public interest under the statutory criteria established in Section 403.918, Florida Statutes. The proposed project will not adversely affect the public health, safety, or welfare or the property of others. The flooding anticipated by the Petitioners is speculative, and has not been directly related to the fill placement and the culverts in the two conveyance/mosquito ditches. Conservation of fish and wildlife and their habitats, will not be adversely affected due to the high marsh replacement and the fact that the area provided only marginal wetland habitat prior to the permit application due to the invasion of exotics at the site. Any impact from the proposed project on this public interest criterion is offset by the mitigation plan. The project will not adversely affect fishing or recreational values or marine productivity in the vicinity of the project. The proposed plantings of black mangroves and the removal of exotics, along with the new high marsh swamp should enhance the productivity of the area. No future projects of a similar nature can be developed at this locale due to the conservation easements the Respondent Telese has consented to provide over the remaining undeveloped property owned by him in the area. These easements will allow the Department to limit and control activities that may be undertaken in these tidal waters to prevent degradation of the site from an environmental standpoint. The mitigation planting schedule provides reasonable assurances that water quality standards will not be violated in the area as a result of culvert placement in the two conveyance/mosquito ditches that transport surface water to Class III waters of the state. Balancing of Interests In the "dredge and fill" permit application appraisal, site review, and Notice of Intent to Issue, DER considered and balanced all of the required statutory criteria to determine that the project is not contrary to the public interest or applicable water quality standards. Area of Controversy All of the areas of controversy raised by the Petitioners which are within the Division of Administrative Hearings' jurisdiction, have been sufficiently met by the reasonable assurances of Respondent Telese and the permit conditions required by DER. Based upon the evidence presented at hearing, it is concluded that the harms anticipated by Petitioners will not occur. Recommendation Regarding the Assessment of Attorneys Fees and Costs Petitioners did not participate in this proceeding for an improper purpose. The Notice of Intent to Issue was vague as to how interests were balanced and how the mitigation would offset the adverse impacts that concerned Petitioners. The petition was filed and prosecuted in good faith and addressed legitimate concerns of concerned citizenry who reside on adjacent lands.

Recommendation Based upon the foregoing, it is recommended: That a Final Order be entered approving Respondent's Telese's dredge and fill permit number 521715273, pursuant to the Notice of Intent to Issue filed August 21, 1990. That Petitioners should not be assessed attorney fees and costs as they did not participate in these proceedings for an improper purpose. RECOMMENDED this 28th day of June, 1991, in Tallahassee, Leon County, Florida. VERONICA E. DONNELLY Hearing Officer Division of Administrative Hearings 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904)488-9675 Filed with the Clerk of the Division of Administrative Hearings this 28th day of June, 1991. APPENDIX TO RECOMMENDED ORDER, CASE NO. 90-7035 Petitioners' proposed findings of fact are addressed as follows: Accepted. See HO #11. Rejected. Does not allow for change in seasons or conditions. See HO #11. Accepted. See HO #11. Accepted. See HO #15. Accepted. Rejected. Not within Hearing Officer's subject matter jurisdiction. Irrelevant to this proceeding. Accepted. See HO #3. Respondent Telese's proposed findings of fact are addressed as follows: Accepted. See HO #1, #2 and #18. Accepted. See HO #1, #2, #20 and #23. Accepted. See HO #20 and #21. Accepted. See HO #21. Accepted. See HO #22 - #27. Accepted. See HO #13 and #16. Denied. Contrary to fact. See HO #4 - #17. DER's proposed findings of fact are addressed as follows: 1. Accepted. See HO #1 and #2. 2. Accepted. See HO #1. 3. Accepted. See HO #1 - #3. 4. Accepted. See HO #2, #18 and #20. 5. Accepted. See HO #20, #21 and #24. 6. Accepted. 7. Accepted. 8. Accepted. 9. Accepted. 10. Accepted. 11. Accepted. 12. Accepted. 13. Accepted. 14. Accepted. 15. Accepted. 16. Accepted. 17. Accepted. See HO #19. 18. Accepted. 19. Accepted. See HO #19. 20. Accepted. See HO #21. 21. Accepted. See HO #18. COPIES FURNISHED: Ines D. Degnan 8410-144th Lane North Seminole, Florida 34636 David R. Chirington 8400-144th Lane North Seminole, Florida 34646 Alton Jeffcoat 8340-144th Lane North Seminole, Florida 34646 Carol B. Newton 8450-144th Lane North Seminole, Florida 34646 Steven M. Siebert, Esquire JOHNSON BLAKELY POPE BOKOR RUPPEL & BURNS, P.A. 911 Chestnut Street Clearwater, Florida 34616 W. Douglas Beason, Esquire Assistant General Counsel Department of Environmental Regulation 2600 Blairstone Road Tallahassee, Florida 32399-2400 Daniel H. Thompson, Esquire General Counsel Department of Environmental Regulation 2600 Blairstone Road Tallahassee, Florida 32399-2400 Carol Browner, Secretary Department of Environmental Regulation 2600 Blairstone Road Tallahassee, Florida 32399-2400

Florida Laws (2) 120.57403.087
# 6
CAHILL PINES AND PALMS PROPERTY OWNERS ASSOCIATION, INC. vs DEPARTMENT OF ENVIRONMENTAL PROTECTION, 93-005916 (1993)
Division of Administrative Hearings, Florida Filed:Key West, Florida Oct. 14, 1993 Number: 93-005916 Latest Update: Jul. 25, 1994

Findings Of Fact Based upon the evidence adduced at hearing, and the record as a whole, the following Findings of Fact are made: Petitioner is a property owners association. Its members own property in the Cahill Pines and Palms subdivision (hereinafter referred to as "Cahill") located on Big Pine Key in township 66 south, range 29 east, in Monroe County, Florida. Cahill is a primarily residential, waterfront subdivision with a man- made canal system. It was platted in 1955. Construction of the canal system began shortly thereafter and was completed in the early 1970's. The Cahill canal system consists of six canals: a 2300 feet long and 75 foot wide, east-west, main feeder canal that dead-ends at its eastern terminus and connects with Pine Channel at its western end /2 (hereinafter referred to as "Canal #1"); and four shorter, /3 but as wide, north-south canals which dead-end at their northern termini and either intersect with, or but for an obstruction would intersect with, Canal #1, at their southern ends (hereinafter referred to as, from west to east, "Canals #2, 3, 4, 5, and 6"). The approximate average water depths of the six canals are as follows: Canal #1, first 1500 feet, west to east: 17.1 feet; Canal #1, remaining 800 feet: 13.3 feet; Canal #2: 16.9 feet; Canal #3: 14.4 feet; Canal #4: 13.2 feet; Canal #5: 13.5 feet; and Canal #6: 15.3 feet. At the northern end of Canal #2 is a full-service commercial marina which has been in operation for at least seven years. The Cahill canal system is obstructed in two areas by earthen plugs: at the southern end of Canal #3 (hereinafter referred to as the "north plug"); and in Canal #1, approximately 1500 feet to the east of Pine Channel (hereinafter referred to as the "south plug"). The two plugs, which contain seagrasses, mangroves and other vegetation, are located on land that is privately owned and that has not been acquired by the federal government to be a part of the National Key Deer Refuge. Because of the existence of the plugs, navigational access to the open waters of Pine Channel from the Cahill canal system is available only from Canal #2 and from that portion of Canal #1 that is to the west of the south plug (hereinafter referred to as the "open or unplugged canals"). The remainder of the canal system is closed off (hereinafter referred to as the "closed or plugged canals"). The open canals contain a total of 25.964 million gallons of water and the closed canals contain a total of 38.964 million gallons of water. Neither the water in the open canals nor the water in the closed canals is presently of substandard quality. Fish and mollusks of various types are in abundant supply in the closed canals. There is a greater diversity and a larger number of living species in the open canals, however. The vegetation on the lots surrounding the Cahill canal system consists primarily of Australian Pines. The lack of other vegetation has resulted in scarification and presents a problem in terms of stormwater runoff entering the canals. This is particularly true with respect to the undeveloped lots, which are unlandscaped /4 and do not have an artificial shoreline. Of the 228 lots in the Cahill subdivision, approximately 73 are on the open canals (hereinafter referred to as the "open lots") and 155 are on the closed canals (hereinafter referred to as the "closed lots"). Approximately 44 of the open lots and approximately 75 of the closed lots are developed. Undeveloped open lots, on the average, sell for approximately $50,000.00. The average selling price of undeveloped closed lots is approximately $14,000.00 or $15,000.00. As a general rule, open lot residents of the Cahill subdivision, unlike their closed lot counterparts, have boats docked behind their homes. There is, as might be expected, considerably more boat traffic on the open canals than on the closed canals. The north and south plugs were the subject of a civil complaint filed in 1980 by the federal government in the United States District Court for the Southern District of Florida against Peace River Groveland, Inc., Charles Kinsell, Jr., and J.R. Shields. The matter was resolved by the entry of the following order by the judge assigned to the case: Whereas, the plaintiff, the United States of America, has filed a complaint in the above-styled matter, and the plaintiff and the defendant, by their respective attorneys, have each consented to the making and entry of this Final Judgment without further pleading or trial or adjudication of or finding on any issues of fact or law raised by the complaint. NOW, THEREFORE, without trial or adjudication of any issue of fact or law herein, and without this Final Judgment constituting evidence or admission by any party with respect to any issue in the pending action or in any other proceeding, and upon consent of the parties, it is hereby ORDERED, ADJUDGED AND DECREED as follows: I This Court has jurisdiction of the subject matter of this action and of the parties thereto. II The provisions of this Final Judgment shall be binding upon the parties jointly and severally, their successors and assigns; all directors, officers, agents, servants, and employees of the defendants. III For the purposes of this Order, all references to geographical locations shall be directed to the annotated Plat of the Cahill Pines and Palms Subdivision, Section 26 and 27, Township 66 South, Range 29 East, Monroe County, Florida, attached to this Order as Exhibit "A". IV Plaintiff and Defendants agree that PEACE RIVER GROVELAND, INC., owned and developed Blocks 6, 7, 8, 9, 10 of Cahill Pines and Palms Subdivision, Big Pine Key, in Sections 26 and 27, Township 66 South, range 29 East, Monroe County, Florida. During 1972 canals were excavated and plugs were left in at points "A" and "B". Between 1974 and 1979 the plugs (at Points "A" and "B") were breached two times by parties unknown. Both times the defendant, PEACE RIVER GROVELAND, INC., restored the plugs. V Defendants agree to maintain these canal plugs to the restored dimensions, unless and until an United States Army Corps of Engineers' permit to remove or otherwise alter these plugs has been granted. VI Plaintiff agrees to record this document in the official property records of Monroe County, Florida. VII Jurisdiction is retained for purpose of enabling the party to this Final Judgment to apply to this Court at any time for such further order and directions as may be necessary or appropriate for construction or carrying out of this Final Judgment, or for the modification or termination of any of the provisions thereof or for the enforcement or compliance thereof. Petitioner, on several prior occasions, has unsuccessfully sought a permit from the Department to remove the plugs. Its most recent prior application was denied by final order issued March 24, 1981, which adopted "in toto" the Recommended Order that the Hearing Officer had issued following a February 6, 1981, hearing. The permit application at issue in the instant case (hereinafter referred to as the "Application") was filed with the Department on July 19, 1991. It requests permission to permanently remove, to a depth of -5.5 feet N.G.V.D., the north and the south plugs, which, the Application accurately states, "are presently creating the blockages to property owners' access to Pine Channel and open water." The amount of material to be removed is considerably less than 10,000 cubic yards. Accompanying the Application was a letter, dated February 9, 1991, from John Cahill to Petitioner's President, the body of which read, in pertinent part, as follows: In response to your letter of January 28, 1991, we have no objections to you (as President of Cahill's Pines & Palms Property Owners Association) establishing a class action to remove the two blockages of the canals in said property. However, some years ago we sold the parcel which includes the blockages (and the present canals). At hand I do not have the addresses of the individuals that purchased this parcel but I am sure that if you contact either: Eric Kip . . . . or William Bradley . . . . They will be able to lead you in contacting them. I do appreciate that if opened these canals will connect to the canals which the County of Monroe has listed as owned by the heirs of Agnes M. Cahill[. I]f this is the reason for contacting us, you do in fact have our permission to proceed at your expense. I have not written to the County regarding this matter for the above mentioned reasons. The Department did not deem the Application complete until the spring of 1993, after it had received from Petitioner the results of a study of the Cahill canal system and its environs that had been done by John Larkin, an environmental consultant Petitioner had hired to perform the water quality sampling the Department required. Representatives of the Department and Petitioner engaged in considerable debate regarding the methods to be employed in conducting such sampling. A meeting on the matter was held on September 24, 1992, in the Department's Fort Myers office. Following the meeting, Petitioner's President sent the following letter, dated November 2, 1992, to Greg O'Connell, an Environmental Supervisor II in the Department's Water Resource Regulation Section: In regards to our meeting on September 1992 at your office for the compliance hearing, we have concluded that D.E.R. has accepted and acknowledged the completion of the original information supplied with ou[r] application with the exception of a water sample and a hydrographic survey as outlined during our meeting. The test sample stations and completion with four sample stations to be submitted to Mr. Ken Echternacht, P.E. of D.E.R. in Tallahassee. To further update our efforts and for your benefit as Superintendent of our application file, we had a meeting of our association membership and all present unanimously agreed to continue with our application to remove two plugs in the Cahill Subdivision located in Big Pine Key, Florida. The financial expense of approximately $17,000.00 is presently being negotiated. Mr. John Larkin will head these two remaining items of the completeness study. Mr. David Horan will continue as our representative and consulting attorney and continue to handle any exceptional litigations required. We would appreciate a written response to this letter and a directive from your office to the U.S. Army Corps of Engineers, Miami and the Dept. of Environmental Regulation in Marathon, Florida that our processing is being continued and that our application is not suspended at this time, as directed in your letter to these offices at an early date. Thank you for your continued work on this case. The Department responded to this November 2, 1992, letter, by sending the following letter to Petitioner's President: The Department received your letter on November 6, 1992 regarding the meeting held in the District's Fort Myers office on September 24, 1992. Water quality sampling and a hydrographic survey are the remaining items that prevent your application from being complete. As discussed in the September 24, 1992 meeting you are concerned about keeping costs down by sampling at a minimum number of stations and performing a minimum number of parameter analyses. Please be advised that the resultant data from four (4) sampling stations at unidentified locations must provide reasonable assurance that water quality will not be degraded by the proposed canal plug removal before a permit can be issued. All water quality sample results should be submitted to the Department's District Office at the above address. Application No. 441998285 remains incomplete as stated in the previous Department completeness summary letters. The Department is not pursuing denial of your application for failure to supply additional information since you have provided notification that progress is being made towards providing the remaining completeness items. Please provide the Department with an approximate date that the water quality data and hydrographic survey will be submitted. Until the completeness items are submitted, all processing of the application is suspended. If you have any questions concerning this matter, please contact Greg O'Connell at our Fort Myers office at the letterhead address or by telephone at (813) 332-6975. Water column and sediment samples were collected by Larkin in or around January of 1993. The samples were collected from four stations: two in the closed canals (one in Canal #3 and the other in Canal #5); one in the open canals, just to the south of the north plug; and one in Pine Channel. Samples from all four stations were integrated or composited and the integrated/composited samples were then tested and analyzed. The sediment samples were tested and analyzed one day after the expiration of the maximum allowable "holding time." With this one exception, the collection of the samples and their testing and analysis was accomplished in a scientifically sound manner designed to obtain accurate and reliable information regarding the composition and properties of these samples. It was Larkin's intention, if the testing and analysis of the integrated/composite samples revealed any "spike" (i.e., the presence of any contaminant in excess of minimum detection limits), to collect additional samples from each of the four stations and have them tested separately so as to determine from which station or stations the detected contaminant or contaminants had come. The testing and analysis of the integrated/composite water column samples failed to reveal the presence of any contaminants in excess of minimum detection levels, and the results of the testing and analysis of the sediment samples, considered in conjunction with the reported visual observations that had been made regarding the outstanding transparency of the water in the Cahill canal system, reflected no abnormalities of concern. Accordingly, no additional sampling, testing or analysis was done before this information was provided to the Department. In or about late February of 1993, the Department received the initial results of Larkin's study. By letter dated March 25, 1993, the Department notified Petitioner's President of what it considered to be the study's shortcomings. The body of the letter read as follows: The Department received your water quality sampling results on February 24 and 26, 1993. The sampling methodology used to collect the samples for the following parameters is not consistent with the Department and EPA procedures: WATER COLUMN Gasoline by-products Diesel by-products Pesticide scan Oils and grease SEDIMENT CHEMISTRY Aluminum Cadmium Copper lead Zinc Arsenic Diesel by-products Pesticide scan Herbicide scan Total organic carbon Specifically the background station was composited with potential impact stations (samples collected within the plugged canals) and a station located just outside of plugged canals. The data submitted does not provide representative water column and sediment quality in the plugged canals because it was mixed with the ambient station. The "integrated composites" collected and analyzed provide no means to compare the potential impact areas (plugged canals) with the ambient water quality. The purpose of collecting the water quality data is to determine if the proposed opening of the plugged canal system will have an [e]ffect on the adjacent Outstanding Florida Waters. The sampling methodology utilized is invalid and does not address the purpose of this investigation. The Department cannot make a determination of what potential impacts the opening of the plugged canal systems will have on the adjacent Outstanding Florida Waters. Reasonable assurances have not been provided that ambient water quality will not be degraded by the proposed canal plug removal. The total suspended solid samples were run after the expiration of the holding time and the resultant data is invalid. Water column total organic carbon samples were collected at depths and bottom, not mid-depth and 20 cm. above bottom as requested. Oxidation reduction potential data was collected at a sample depth of 2' and 10', not at 20 cm. above the bottom as requested. Please resample the above parameters using methodology consistent with the Department's request or request that the Department continue to process your application with the data submitted. The Department has not received the hydrographic survey requested in previous completeness summaries and discussed in the September 24, 1992 meeting held in the District's Fort Myers office. If you have any questions concerning this matter, please contact Greg O'Connell of our Fort Myers office at the letterhead address or by telephone at (813) 332-6975. Larkin, on behalf of Petitioner, responded to the Department by letter dated March 27, 1993. In his letter, Larkin argued that the sampling, testing and analytical procedures and techniques that were employed in his study were those upon which the Department and Petitioner agreed at their September 24, 1992, meeting in Fort Myers. Larkin asserted that "[t]his agreement was formed between the agency (FDER) and the Property Owners to save on exorbitant testing costs" and that the procedures and techniques agreed upon are "proven and accepted . . . throughout all agencies and . . . widely used to accomplish cost savings." Larkin then stated the following: The results were that there was no indication of any pollutant in the water column. The metals were all in normal range for any background comparison. The sediments showed counts in Fluoranthene (2700 ug/kg), Silvex (less than 0.75 ug/kg) and 2,4-D (less than 7.5 ug/kg). All parameters in the composite water column samplings were below contamination levels, even at the multiplier of 4 and found in much greater quantities throughout the Florida Keys. Consequently, no additional testing would be necessary as per our agreement. As indicated by your March 25, 1993 letter, it seems that you (FDER) are ignoring our compliance meeting on September 24, 1992 in regard to this issue. As you have stated, "the integrated composites collected and analyzed, provide no means to compare the potential impact areas (plugged canals) with the ambient water quality" is partially true. What is not stated, is that the composite water column data- at "extremely low" limits of detection- show no indication of parameters that would effect the quality of any water- anywhere- at any time, even at 4 times the minimum detection limit. Therefore, the procedure has saved the property owners several dollars in testing costs and should [as]sure F.D.E.R. that there [are] no water column pollutants in the area of the 4 stations, including the ambient areas. Ergo, the ambient water quality will not be degraded by the proposed canal plug removal and is even more clear to that fact in the individual testing included at the individual stations. In regard to the suspended solids being tested after the expiration of the holding period, please forgive the lab on record. The samples and handling of the same were completed as noted in the enclosed chain of custody record. The lab apologizes and will re-run any more TSS samples free of charge, if necessary. However, the future sampling will most likely be of better quality. As stated in the data sent to F.D.E.R., there was a 3" rain event just before sampling. As stated in the study in regard to secchi disc readings, the water clarity was improving. Please advise me if you want repeated sampling of the parameter or if you will accept the long approved method of secchi reading in lieu of the fact the ambient water was less clear than the closed canals. Water column T.O.C. samples were collected as required. The lab report only typed out the last word of the sample description. Please refer to the sample data (samples run on sample points as calibrated insitu on Jan. 13, 1993 data sheet) and also on the enclosed chain of custody record. Oxidation redux potential was not only taken as required, but was included at many other depths and stations where it was not required by F.D.E.R. Please refer to Jan. 13 & Jan. 18, 1993 sample data insitu sheets. Also please read about the RPD (Redux Potential- Discontinuity layer) in the conclusion section of my report. In light of the above facts, I request that you read the Cahill Canal Study sent to you in depth and please note that the additional data included in the study paints a picture of un-requiredthe Cahill canal eco-system,[ a] holistic view that show[s] the plugged canals as no threat whatsoever to the ambient waters. With respect to the "hydrographic survey" the Department required, Larkin promised to provide a "complete study" sometime after April 8, 1993. Following this exchange of letters in March of 1993, neither Petitioner nor anyone acting on its behalf conducted any further water column or sediment sampling, testing or analysis. On or about May 20, 1993, the Department conducted a field survey and appraisal of the project site. During its field survey and appraisal, the Department took approximately 56 dissolved oxygen readings at 19 different stations (18 in the Cahill canal system and one in Pine Channel). /5 The highest reading was 13.3 milligrams per liter, which was obtained at a station at the northern terminus of Canal #3. There were only two readings below 5.0 milligrams per liter (a 4.5 milligrams per liter reading obtained at a station in Canal #6 and a 4.6 milligrams per liter reading obtained at a station in Canal #5). The two readings obtained from the station in Pine Channel were both 9.3 milligrams per liter. The hydrographic information that Petitioner provided the Department was reviewed by Kenneth Echternacht, a hydrologist employed by the Department. After reviewing the information, Echternacht reached the following scientifically sound and credible conclusions, which he reduced to writing in a memorandum, dated June 25, 1993, that he sent to O'Connell: The estimated flushing for the presently open portion of the waterway was calculated to be 14.5 days. The flushing for the open section exceeds the 4 day flushing criterion by approximately 3.6 times. Clearly, the open portion poses a potential problem to the maintenance of acceptable water quality. For the presently closed sections of the waterway, the calculated flushing time was found to be 38.6 days. Again, this system would pose a significant potential for contamination to adjacent open waters if opened for use. The waters behind the barrier that presently appear to pose no problem would clearly become a repository for contaminants associated with boat usage. Because of the exceptionally long flushing time, contaminants would build up over time. Below standard water quality throughout the waterway would be expected and, associated with this, below standard water would be exported into adjacent clean water on each ebbing tide. Recommendation Based on hydrographic considerations, the project is not permittable. On August 20, 1993, the Department issued a notice of its intent to deny Petitioner's application for a permit for its plug removal project. In its notice the Department listed six proposed "changes to the project [that] may make the project permittable." Removal of the plugs as proposed will result, at least temporarily, in the elimination of the vegetation presently found on the plugs. Any regrowth would take six months to a year and be in the form of seagrasses or algae. Petitioner's plug removal project will also spur development in the Cahill subdivision and lead to an increase in boat traffic in the Cahill canal system, as well as in the adjacent waters of Pine Channel. Such activity will result in the discharge of additional contaminants in these waterways. As Echternacht stated in his June 25, 1993, memorandum that he sent to O'Connell, "[b]ecause of the [canal system's] exceptionally long flushing time, [these] contaminants would build up over time" and result in a significant degradation of the water quality of not only the Cahill canals, but also of Pine Channel, into which Cahill canals flow. This degradation of water quality will have an adverse effect on marine productivity and the conservation of fish and wildlife that now inhabit these waterways. Consequently, in the long run, the removal of the plugs will negatively impact fishing opportunities in the area. On the other hand, the project will have a beneficial effect on navigation and recreational boating and related activities. It will have no impact on historical and archaeological resources. Backfilling the canals to a depth of -6.0 MLW in conjunction with plug removal, as the Department suggested in its August 20, 1993, Notice of Permit Denial, would result in less deterioration of water quality than would otherwise be the case, but it would not completely solve the water quality problems caused by plug removal. Moreover, such backfilling would create an ideal habitat for the upside-down stinging jellyfish, whose presence would discourage people from using the canals for swimming and similar recreational activities. In any event, Petitioner has indicated that this proposed mitigative measure is unacceptable to it. Petitioner has proposed no mitigative measures of its own, although it has suggested that "future monitoring could be set up to determine any possible water quality deterioration" and if "there was any 'significant' water quality deterioration . . . the plugs could be reconstructed in their present location."

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is hereby RECOMMENDED that the Department of Environmental Protection enter a final order denying Petitioner's application for a dredge and fill permit to remove the north and south plugs separating the open and closed canals in the Cahill canal system. DONE AND ENTERED in Tallahassee, Leon County, Florida, this 9th day of May, 1994. STUART M. LERNER Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 9th day of May, 1994.

Florida Laws (7) 267.061373.403373.414373.415373.421403.03190.706
# 7
GEORGE H. HODGES, JR. vs. JACKSONVILLE SHIPYARDS, INC., AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 86-000365 (1986)
Division of Administrative Hearings, Florida Number: 86-000365 Latest Update: Oct. 16, 1986

The Issue Respondent Jacksonville Shipyards, Inc. (JSI) filed a permit application with the State of Florida, Department of Environmental Regulation, (DER), for permission to conduct maintenance dredging in a basin associated with its shipyard operation. This permit application was made in accordance with Chapter 403, Florida Statutes, and Chapter 17, Florida Administrative Code. In the face of DER's statement of intent to grant this permit, George H. Hodges, Jr., (Petitioner), has petitioned in protest. Therefore, the issues to be considered in this dispute concern the entitlement of JSI to the grant of an environmental permit for maintenance dredging of its shipyard basin.

Findings Of Fact DER is an agency of the State of Florida charged with the environmental protection of waters within Florida. Its authority includes regulatory powers announced in Chapter 403, Florida Statutes, and Chapter 17, Florida Administrative Code. Certain activities involving state waters require permission from DER before they be lawfully undertaken. Among those activities are dredge projects such as contemplated by JSI in its pending request to be allowed to maintenance dredge as much as 66,000 cubic yards of material per year from its shipyard basin located in Jacksonville, Duval County, Florida. This is an undertaking which is envisioned by Chapter 403, Florida Statutes, related to the permit responsibility of DER. It is specifically addressed by Rule 17-4.28, Florida Administrative Code, in which is found the statement of permit requirements for dredge and fill activities. JSI, the applicant, operates a facility known as Bellinger Shipyard, which is engaged in the repair and maintenance of commercial and naval vessels. This enterprise includes the drydocking of vessels upon which repairs are effected, through the use of several drydock chambers in shipyard basin. In the course of the maintenance, a technique known as "gritblasting" is employed. The purpose of this "gritblasting" is to clean the ships in anticipation of repainting. On occasion the "gritblasting" would remove all coats of paint down to the metal finish of the ship. The paints being removed contain antifouling and anticorrosive materials. Those materials have, among other properties, the ability to repel marine organisms, causing their mortality. The "gritblasting" process utilizes a material known as "black beauty." This is a waste product from firing power plant boilers and it contains iron, silica, aluminum, titanium, magnesium, lime, penta oxide (P2O5), sodium oxide, sulfur trioxide and potassium oxide. The "black beauty" is applied through the use of a pressurized system which forces the material onto the treated surface under pressure of 70 to 85 pounds per square inch. After the preparation is made, vessels under repair are repainted, and similar paint with antifouling and anticorrosive properties is reapplied. During the "gritblasting" process, dust is generated and a portion of that material finds its way into the water within the basin. Other particles being removed drop to the deck surface of the drydock. When paint is reapplied to the surface of a vessel undergoing repair, it is given the opportunity to dry and the vessel is then refloated and removed from the drydock. To do this, the drydock itself is submerged. When the vessel has exited the drydock facility, the drydock resurfaces and is allowed to dry out. The material which has been removed from the surface of the repaired vessel is then shoveled into containers and transported to an offsite sanitary landfill for disposal. This material removed includes the "gritblasting" compound and paint which has been stripped from the surface of the vessel. When the drydock is submerged following vessel servicing, the inference can be drawn that a certain amount of the materials on the drydock deck surface will be introduced into the water within the basic before the drydock is resurfaced. The arrangement for refloating the vessel is the reverse of the technique employed in lifting the vessel out of the water for maintenance. When the vessel is brought in for service, it is guided into a submerged drydock. Water is then pumped out of the hollow drydock walls and deck to raise the vessel out of the water, allowing access to the vessel, which is completely above the water surface, as is the drydock work deck. The basin in which the business activities of JSI take place is located on the western shore of the Intercoastal Waterway. The Waterway and basin are part of an estuarine system, as these water bodies are tidally influenced. The basin and the Intercoastal Waterway constitute Class III waters of Florida. The configuration of the basin is as found in JSI Exhibit 16, an aerial photograph of the site. Moving from east to west within the basin, it is approximately one thousand feet from the Intercoastal Waterway to the back of the basin in its western-most extremity. In the back area of the basin the north- south axis is 250 feet. The interface between the basin and the Intercoastal Waterway on the eastern reach north-south axis is approximately 625 feet. There are no obstructions to the confluence of the Intercoastal Waterway and the eastern side of the repair basin. The southern-most reach of the basin is approximately 350 feet in length running east to west. On the eastern side of the basin there is a pier area which is roughly 360 feet north-south by 60 feet east-west. As described before, the pier is not a solid structure extending to the bottom of the water. Thus, water can be exchanged between the basin and the Intercoastal Waterway beneath the pier. JSI had acquired the Bellinger Shipyard in 1974. At that time environmental permits had been issued allowing for the maintenance dredging of the basin. These permits were valid through 1975. In 1975, JSI obtained a dredge and fill permit from the Florida Board of Trustees of the Internal Improvement Trust Fund, as well as a dredge and fill permit from the United States Corps of Engineers. These permits were for a ten-year period. They allowed maintenance dredging in the amount of 66,000 cubic yards per annum and for the disposal of the dredged material in an EPA-approved offshore site. In 1980 DER confirmed the dredge and fill permit that had been obtained from the Florida Board of Trustees. This permit by DER required JSI to conduct monitoring of turbidity during dredging, but did not require employment of turbidity screens. In 1979 the Army Corps had required JSI to conduct bioassay analysis in furtherance of the federal dredge and fill permit. In the face of the results obtained in that bioassay analysis, the Army Corps continued the dredge and fill permit to JSI dating from August 14, 1980. A subsequent extension of the federal permit was given through August 14, 1986. Contemporaneous with the present permit application before DER, JSI has requested further permission from the Army Corps related to the ability to excavate as much as 66,000 cubic yards of material on an annual basis. JSI has not been cited by any regulatory agency related to water quality violations associated with its dredging activity. The present DER permit application is for renewal of the 1980 Permit No. 16-21380 and is being processed under the DER File No. 161071139. This application for permit renewal was submitted on July 16, 1985. The application requests permission to maintenance dredge for a period of ten years. If granted, it is the intention of the applicant to use a closed clam shell bucket to excavate the material in the basin. This choice is in furtherance of the suggestion of DER and is a departure from the applicant's initial intention to use an open bucket to excavate. JSI also intends to employ turbidity curtains during the dredge activities. The applicant intends to transport the dredged material to the aforementioned EPA disposal site which is at sea. In doing so, a hopper barge is propelled by a towing vessel. Both the barge and towing vessel are inspected and certified by the United States Coast Guard. The crews involved in the transport of the material are qualified and licensed. In the past, transport of the material has been done under fair weather and smooth sea conditions, and it is intended that the transportation be done in that same setting if the permit is granted. The barge would not be loaded fully, thereby minimizing spillage. This was the arrangement in the past. The United States Coast Guard will be apprised of the departure time of the voyage in transport of the material, certain activities within that transport and upon return. The hopper barge has a bottom dump which is closed during transport and is opened at the bottom in disposing the dredge material. After satisfying DER about its proposal, JSI was informed that DER intended to grant the dredge permit requested. When Petitioner, George H. Hodges, Jr., the owner of real property adjacent to the site of the project, learned of the stated intention to grant the maintenance dredging permit, he offered a timely petition in opposition to the proposed agency action. This property of Petitioner is in Jacksonville, Duval County, Florida. It is located north of the JSI property at issue. Petitioner's real property is connected to the Intercoastal Waterway. Petitioner has filed this action in opposition to the grant of the permit upon the expressed belief that the dredging activity will cause pollution at his property. In particular, it is JSI's intention at various times in the calendar year to do maintenance dredging in the entire basin. In addition to using a closed clam shell bucket, a system of turbidity barriers or curtains will be employed in segmented dredge areas. Those several locations within the basin which are cordoned off with the turbidity curtains are as depicted in JSI's Exhibit 9 admitted into evidence. The design maintenance depths for the dredging project are set forth in JSI's Exhibit 4 admitted into evidence. They vary from -17 to -37.5 feet, with the greatest depth being contemplated under drydock number 1 in the northwestern corner of the basin. Near the Intercoastal Waterways the depth sought is -17 feet, transitioning to -21.5 feet moving toward the back of the basin at the western extreme and outside of the area dredged beneath drydock number 1. The depths sought under drydock numbers 2 and 3 are -26.5 feet and -20 feet respectively. These desired elevations correspond to conditions at mean low water. The tidal range in the Intercoastal Waterway adjacent to the basin, which would promote an influence in the basin proper, is in the neighborhood of 4-foot intervals, with two tidal cycles a day. This would mean, as example, that at the high tide range, the shallowest design depths for dredging of -17 feet become -21 feet in the transition from mean low water to mean high water. Those 4-foot variations would pertain to the other design depths contemplated in the dredging as described in the preceding paragraph as well. The turbidity barriers contemplated for use will extend from the surface through the water column to depths near the bottom. See JSI Exhibits 4 and 9. It is desirable, according to Dr. Gregory Powell, witness for JSI, a reliable expert in describing the effectiveness and use of turbidity curtains, to have those curtains extend to an area just above the bottom. Dr. Powell's education includes a Masters Degree in coastal and oceanographic engineering and a Ph.D. Degree in engineering mechanics, with emphasis on coastal and oceanographic engineering. In consideration of his remarks, under the influence of high tide there could be as much as a 4 foot gap between the curtain and the bottom. Powell and other experts who offered testimony agreed that turbidity screens can have effectiveness in areas of low current velocity, assuming the proper installation, maintenance and extension to a location near the bottom of the water body. If mismanaged, turbidity screens are not effective in controlling turbidity. Moreover, they are less effective in areas where significant current velocities are experienced. This would include the circumstance in which a foot and a half or more per second of flow was being experienced, according to Dr. Powell, whose opinion is accepted on this point. He also indicated that the quiescent areas in the basin, toward the back of the basin or western dimension of the basin, would show a flow regime in a rate of one centimeter per second. This expression is credited. Although, as described by Dr. Powell, the currents in the Intercoastal Waterway are moving at a rate approximating nine feet per second on ebb time at the bridge located on the Intercoastal Waterway to the south of the project site, these current velocities are not expected in the area where the dredging is occurring. Dr. Powell is correct in this assessment. As he describes, and in acceptance of that testimony, eddies from the current from the Intercoastal Waterway at peak flood tide could come into the basin and temporarily show velocities of one foot per second; however, these velocities are within the acceptable range of performance of the turbidity barrier. Dr. Powell's conclusion that wind would have no significant effect on the current velocity, given the depth of this basin, is also accepted. The remaining flow regime in the basin is not found to be a detriment to the function of the turbidity barriers. The use of turbidity curtains in this project is not found to be a "placebo" to placate DER as suggested by Erik J. Olson, engineering expert who testified in behalf of the Petitioner The monitoring that is intended in the course of the dredging activities would call for examination of background turbidity levels at three sites in the Intercoastal Waterway prior to commencing of dredging and twice daily at each of these sites during dredging. Should a violation of state water quality standards for turbidity be detected, dredging will cease until the problem with turbidity can be rectified. To provide ongoing assurances of compliance with water quality standards, JSI will analyze the sediment in the basin for the parameters of cadmium, copper, aluminum, lead, mercury, oil and grease every two years. Dr. Powell, expert in engineering and recognized as an expert in the matter of transport of the resuspended sediment associated with the dredging, as well as David Bickner, the project review specialist for DER, believe that the use of the closed clam shell bucket technique and employment of siltation screens or barriers, together with turbidity monitoring, will effectively protect against turbidity violations in the Intercoastal Waterway adjacent to the basin. This opinion is accepted. Bickner brings to his employment a Bachelor of Science degree in biology and a Master of Science degree in ecology. Bickner identified the principal concern of DER related to this project as the possibility of release of resuspended sediments into the Intercoastal Waterway. With the advent of the techniques described in the previous paragraph, only minimal changes in background conditions related to turbidity are expected. Although there would be turbidity violations within the confines of the areas where the dredging occurs, the principal influence of that turbidity will be confined in those regions. This speaks to dredge areas I, 2 and 3. According to Bickner, whose opinion is accepted, the turbidity changes within the dredge areas in relationship to background conditions do not require a mixing zone permit, nor do they constitute a basis for denial of the permit. As alluded to before, and as described by Dr. Powell, the basic nature of the basin in question is one of quiescent conditions with low current velocity. He points out that the layout of the basin is such that it is a sediment trap allowing the deposit of silt, in particular in the deeper sections of the basin near the western side. The greatest influence by resuspension of sediment in the dredging activities can be expected in the back portions of the basin and it is in this area that the silt barrier can be expected to be most efficient, based upon Powell's remarks. Dr. Powell indicated that there is the expectation of increased efficiency in turbidity control when a closed clam shell bucket is used, as opposed to the open style of clam shell bucket. Those efficiencies range from 30 to 70 per cent. There is some risk of increased turbidity near the bottom of the water column in the use of a closed clam shell bucket, and for that reason the applicant should monitor the activities of the operator of the excavation machinery to guard against inordinate disturbance of the area being excavated. On balance, the closed clam shell bucket is a superior technique to the open style of clam shell bucket excavation when those alternatives are compared. As Dr. Powell explained, the segmentation of the dredge area allows the resuspended sediment to be confined in more discrete circumstances and to be controlled. The location of the silt barriers behind the pier structure guard against the effects of eddying. The silt barriers can be properly anchored and will not be unduly influenced by current velocity. Dr. Powell believes that the use of silt barriers, taking into account a low velocity of current in the basin, and the proper deployment of the siltation screen could bring about a reduction of the resuspended solids by 80 to 90 per cent on the outside of the barrier. To calculate the influence or the environmental significance of that remaining 10 to 20 per cent of resuspended solids at the Intercoastal Waterway, Dr. Powell testified that the suspended load behind the silt curtain resulting from the dredging is expected to average from 100 milligrams per liter to a peak amount of 500 milligrams per liter. He believes that, depending on which methods of calculation is used, the dilution factor in the Intercoastal Waterway ranges from 330:1 to 600:1. In using an environmentally conservative assessment, that is 80 per cent effectiveness of the silt curtain with a 330:1 ratio, Powell calculated that the release of resuspended materials into the Intercoastal Waterway would be approximately .3 to 1.5 milligrams per liter. This translates to less than 1 NTU against background conditions. This result would not exceed the 29 NTU limit against background that is described as the standard for turbidity control. Dr. Powell's opinion of turbidity results based upon the dredge activity is accepted. There is exchange of water between the basin and the Intercoastal Waterway and to accommodate this influence, the turbidity curtains would be placed in such a fashion that they would not compete with the ebb and flow of the tide. Dr. Powell's assessment of the circumstance in describing the effectiveness of turbidity barriers takes into account the tidal conditions and the inappropriateness of trying to have the silt curtains prohibit the flow conditions during these tidal changes. In order to promote maximum effectiveness of the turbidity barriers during the entire course of excavation of materials, the length of, the silt screen must be adjusted as desired elevations are approached. Erik J. Olson is an expert in civil engineering with an emphasis on hydraulics and the holder of a Masters Degree in coastal and oceanographic engineering. As alluded to before, he questions the validity of the use of siltation barriers as an effective protection against the implications of turbidity. He properly points out that the curtains will not extend to the region of the interface of the basin and the water column at all times. He describes the exchange of water between the basin and the Intercoastal Waterway, to include the unrestricted sediment transport beneath the turbidity curtain. He believes that wind can cause changes in current velocity as great as .2 foot per second, activities within the basin an additional .3 foot per second, and eddying .3 foot per second. All of these taken together do not exceed the range of effective response of the turbidity barriers. On balance, Olson's criticism of the benefit of turbidity curtains is unconvincing. Arlynn Quinton White, Jr., who holds a Bachelor of Science Degree, a Master of Science Degree in biology and a Ph.D. in matters related to marine biology, offered his testimony in support of Petitioner. He believes that as much as 2 to 3 per cent of the resuspended sediment related to the dredging activities would reach the Intercoastal Waterway under the best of conditions. It is difficult to translate that testimony into a measurement of changes in turbidity levels against ambient conditions in the Intercoastal Waterway. In any event, as already indicated, the changes in turbidity levels are not expected to exceed 29 NTU against background. It is evident that the turbidity curtains are necessary and their proper use must be assured to protect against problems associated with turbidity and the implications of the constituents of the resuspended particulate matter related to possible toxicity. Therefore, the close monitoring suggested in the statement of intent to grant the dredge permit is viable. Another matter associated with the implications of turbidity pertains to the fact that when the dredge material has been resuspended, as much as two days could pass before the basin returns to background conditions, given the high content of silt with its attached metals. This becomes significant given the uncertainty of the location of the dredge equipment during the course of excavation, i.e., inside the barrier or outside the barrier. Final choice about the placement of the dredge equipment will have to be made at the time of the excavation. Should the dredge equipment be inside of the cordoned area while excavation is occurring, it would be necessary to allow turbidity conditions to achieve background levels before opening up the barrier for the exit of the hopper barge which contains the excavated material. Otherwise, the estimates as to the influence of the dredging activities in the Intercoastal Waterway are unduly optimistic. Likewise, if the excavation platform is placed outside of the work site, that is to say, on the outside of the siltation curtain, extreme caution must be used to avoid spillage of the excavated material when being loaded onto the hopper barge. The occasions in which the excavation is being made from this side of the barrier should be minimized. These safeguards are important because any changes in sediment loading within the Intercoastal Waterway promote an influence in the area immediately adjacent to the basin and other sites within the Intercoastal Waterway as well. The subject of the use of a hydraulic dredge as an alternative to excavation by use of a closed clam shell bucket was examined in remarks by the witnesses appearing at hearing. Olson believes that there are hydraulic dredges which can achieve the design depth contemplated by the project and which equipment could fit inside the basin area. This is contrary to the opinion of witnesses for the applicant and DER who do not believe that the hydraulic dredging equipment which would be necessary to achieve the design depths would fit into the basin area. On balance, the record does not establish that such equipment with the appropriate capability and size does exist. More importantly, the proposed method of excavation is environmentally acceptable when examined in the context of the permit sought in this case. Finally, it was not essential for the applicant to make a detailed investigation of availability of hydraulic dredging equipment and it is not determined that failure to make this investigation warrants the denial of the requested permit. Although an hydraulic dredge is more desirable from the standpoint that it causes less turbidity through resuspension of sediments, it is not the only plausible method of excavation in this instance. Raymond D. Schulze testified in behalf of JSI. He holds a Bachelor of Science Degree and a Master of Science Degree in environmental engineering sciences. In particular, he established the fact that the amount of resuspended solids that would be introduced into the Intercoastal Waterway associated with the dredging activity would not result in the smothering of organisms or to clogging of gills of fish. In addition to the possible problems with turbidity, there is the additional issue of violation of water quality standards in the several parameters associated with concentrations of metals in the water column within the basin and in the sediments or related parameters such as dissolved oxygen and biological integrity. Having considered the testimony, the facts do not point to water quality violations for any parameters occurring in the Intercoastal Waterway as a result of the dredging. To arrive at this factual impression, the testimony of Dr. Pollman and Schulze is relied upon. Water quality sampling done by JSI in locations within the basin and in the Intercoastal Waterway, that by Dr. Pollman and Schulze, supports their impression of the acceptability of the dredge activities. This water quality data was admitted as JSI's Exhibit 18. Additionally, the field conditions existing at the time of testing, to include water temperature, weather conditions, tidal cycle, ph and dissolved oxygen were also made known. This water quality data and other information examined by these witnesses points to the fact that no increases in concentrations of metals are occurring within the Intercoastal Waterway as a result of the business activities of the applicant, nor are they to be expected while dredging operations are under way. Dr. Pollman correctly identifies the fact that there will not be significant degradation of water quality, above DER's minimum standards, related to the Intercoastal Waterway based upon the dredging activities within the basin, dealing with the water quality parameters of mercury, zinc, cadmium, chromium, lead, aluminum, iron and copper, substances which are within the basin. Dr. Pollman also examined sediment data collected by DER, and that data tended to confirm his assessment of the influences of the dredging activity related to these parameters. Dr. Pollman does not believe that metal concentrations contained in the sediment of the basin are leaching into the water column in quantities sufficient to cause violation of water quality standards. His opinion is accepted. Pollman had collected water quality samples in the two locations where the greatest siltation rate was expected and as a consequence the greatest concentration of metals would be expected. The water quality samples were taken at several depths to reach an opinion as to the matter of leaching of metals into the water column and the possibility of those metals dissolving in the water column. If leaching had been occurring, a concentration of metals expressed as a gradient would be expected. The greatest concentration in this instance would be near the sediment interface with the water column. No such gradation was detected and the idea of leaching was ruled out. Bickner's testimony established that testing for the exact amount of iron present at the dredge site was not required, given the nature of the iron source being introduced into the water within the basin. Bickner did not find that type of iron to be toxic. As stated before, Pollman agrees that no violation of state water quality standards as a result of the presence of iron associated with the maintenance dredging should be expected. There is some data which shows water quality violation for mercury in the basin and the Intercoastal Waterway. Subsequent water samples collected by Schulze in the westerly portion of the basis did not show detectable levels of mercury. Moreover, data taken by Pollman and Schulze and compared with the DER sediment data shows that the concentration levels of mercury are greater in the Intercoastal Waterway than in the basin, thereby suggesting that there is no concentration gradient for mercury which would lead to the belief that the basin contributes to the amount of mercury found in the Intercoastal Waterway, nor is the mercury believed to be leaching into the water column in the basin. The explanation of the differences in measurements of the amount of mercury in the basin, depending upon the point in time at which analysis was made, may be attributable to a natural phenomenon, given numerous sources of mercury within the environment. Whatever the explanation of these changes, Dr. Pollman does not believe that the release of mercury associated with the resuspended sediments that may find their way into the Intercoastal Waterway would show a violation of the state water quality standard for mercury in that water body and his opinion is credited. Data collected by Pollman and Schulze did not show water quality violations for aluminum and the DER test data described before indicated aluminum levels lower in the basin than in the Intercoastal Waterway. Some data collected by Technical Services, Inc., an environmental consulting firm in Jacksonville, Florida, which was reviewed by Pollman, Schulze, and Bickner showed a substantial violation of the water quality standard related to aluminum in sediment sampling that was done. The origin of that amount of aluminum found on that occasion was not clear. It is possible, as described by Bickner, Pollman and Schulze, that the level detected In the Technical Service report could have occurred based upon natural phenomena such as storm water runoff from uplands. Bickner also questioned the findings of Technical Service and felt like the determination might be influenced by some intervening circumstance which would promote the need for re-analyzing that parameter. Whatever the explanation of the findings in the Technical Service report, it does not point to any water quality violation of the standard related to aluminum based upon the dredging activities, given the limited amount of total suspended solids that would be introduced into the Intercoastal Waterway. Schulze, in his assessment of the implications of metal concentrations in the sediment transported to the Intercoastal Waterway, did not find them to cause concern about toxicity to marine life in the Intercoastal Waterway. This point of view is accepted. In trying to understand the implications of metal concentrations, Schulze believed that the biologically available fractions of those metals in the sediment is not very high, and when the dilution of the sediments which occurs in these circumstances is examined, no toxicity is expected. Moreover, as Dr. Pollman described related to the parameter aluminum, it is not a toxic material at the ph levels found in the basin, and the resuspension during dredging will not cause it to gain toxicity. This opinion of Dr. Pollman is supported by Bickner and Schulze. The opinion of Dr. White that the amount of aluminum, copper and zinc within the sediment found in the basin would eventuate in the violation of water quality standards for those parameters when introduced into the Intercoastal Waterway is rejected. The information available to Pollman, Schulze and Bickner which describes their opinion about water quality standards was sufficient to reach an opinion, the position of Petitioner's witness Sanford Young, holder of a Bachelor of Science Degree in civil engineering and a Master of Science Degree in zoology notwithstanding. As Bickner indicated in his testimony, it is essential that an applicant give reasonable assurances of compliance with all parameters listed in Chapter 17-3, Florida Administrative Code, dealing with water quality. However, this does not mean that testing must be done for each parameter set forth in that chapter. Reasonable assurance has been given that water quality parameters as identified in that chapter will not be violated. Bickner indicates the biological integrity standard is not one of concern in that given the nature of business operations within the basin, there is no expectation of a stable benthic community which might be disturbed by dredging. From the remarks of Schulze, there is no prospect of danger to benthic communities within the Intercoastal Waterway. These impressions by Bickner and Schulze are accepted. Under the facts of the case, the failure of the DER permit appraisers to discover benthic organisms in the sample grabbed at the site is not unexpected. There is also some question about whether that sample is representative of the circumstance at the site, given the limited sampling. On the topic of normalization of the DER data which was described in the course of the hearing and is identified by Dr. Pollman, the value of that information is seen as establishing the relative quantities of certain metals within the basin as compared with other sites throughout the Intercoastal Waterway. Twenty-one different locations were involved in this analysis. Concentration ratios using aluminum to normalize the data are as reflected in JSI's Exhibit 17 admitted into evidence. The significance of this information as it grossly describes whether the basin routinely contributes to increases in the amounts of these metals within the Intercoastal Waterway. Overall, basin activities are not shown to have promoted such an outcome. This normalization comparison does not address the issue of site specific water quality violations; however, no such violations are expected associated with the dredging activities within the basin as it relates to violations in the adjacent Intercoastal Waterway. Schulze had made sampling related to dissolved oxygen within the basin and the Intercoastal Waterway. As Schulze describes, the levels of dissolved oxygen seem to be at their lowest point just prior to the dawn hours. Sampling which he did was done at 5:00 a.m. in order to obtain the lowest dissolved oxygen readings. Three sites were sampled within the basin and an additional site was sampled in the Intercoastal Waterway. Readings were taken at varying depths at each site to gain an impression of the overall water column. The mean reading for the circumstance was in excess of the required range for state water quality, that is 4.0 per million. Having considered the evidence, no problems with dissolved oxygen are expected in that deficit contribution is in the range of .1 milligram per liter, per Pollman. In addition, Dr. Powell, through modeling, examined the implications of long-term dredging activities on the topic of dissolved oxygen. He employed field data gathered by Schulze in this assessment. This modeling established that decreases in dissolved oxygen levels would range from .1 to .15 milligrams per liter. Given the average of 4.5 parts per million oxygen in the basin at present, the incremental decreases in dissolved oxygen levels related to the dredging would not pose a problems with state water quality standards for dissolved oxygen other than short-term effects in the immediate vicinity of the dredge area, which is an acceptable deviation. As the Petitioner urges in its fact proposal, a 1983 report of Technical Services, Inc., JSI Exhibit 4, and a 1985 report of that firm, JSI Exhibit 7, were made available as part of the application. Officials within Technical Services, Inc. did not appear at the hearing and offer testimony related to the specific findings found in those reports. This information was used by the experts who did testify on behalf of the applicant, in particular Dr. Pollman, as data to question, his assumptions made about the implications of the project in terms of water quality concerns. Pollman also utilized DER data taken from a source known as Storette, and this pertains to the 21 sampling stations involved in the preparation of JSI Exhibit 17, the graphing document related to concentrations of various metals. Again, this was in furtherance of the basic underlying opinion which Pollman had about the project. The Storette data as such was not offered into evidence. Witnesses for the Petitioner, namely Olson and White, were aware of the two reports of Technical Services, Inc. and the use of the DER Storette data and offered their criticism of the project taking into account this information. Petitioner points out that there is no indication as to how far below the sediment/water interface the Technical Services, Inc., and DER sediment samples related to reports of the consultant and the Storette information of DER were extracted. Therefore, it only reflected one portion of the sediment at a depth of extraction. A more complete understanding of the sediment characteristics would have been shown through a core sample, especially in the area to be dredged, but that understanding was not essential. The suggestion by the Petitioner that it was inappropriate to normalize data for purposes of describing the relative concentrations of the metals parameters is not accepted. The preparation of JSI's Exhibit 17 does not point to abnormally high amounts of aluminum, such that the use of aluminum as a known commodity in carrying out the normalization would be contraindicated. As identified by the petitioner in its proposal, sediment sizes within the strata found in the basin depicts higher percentage of silt and clay-size sediments in the back end of the basin with lesser amounts of the silt- and clay-size sediments in the southern reach of the basin and at the intersection of the basin with the Intercoastal Waterway. The smaller the particles, such as silt and clay, will remain suspended for a longer period of time and have a tendency to promote bonding with heavy metal. Nonetheless, this information does not change the impression that the turbidity barriers will be effective. The 1983 Technical Services, Inc., information related to the settling of resuspended sediment and similar information imparted in the 1985 report by that organization tend to confirm that approximately two days should be necessary to allow the area of excavation to return to background conditions related to turbidity. This is in corroboration of remarks by Dr. Powell. These time projections are not found to be inadequate when taking into account other factors such as tidal changes, boat traffic, other activities within the basin, wind and weather events. As White described, the antifouling properties of the paint involved in the business activity of the applicant can be expected to adversely impact any larval forms of marine organisms when introduced into the basin. Nonetheless, this toxicity is not expected to pose a danger to marine organisms in the Intercoastal Waterway given the percentage of resuspended sediment that will escape capture by the sediment barriers and the dilution factor before introduction of those resuspended sediments into the Intercoastal Waterway. Petitioner questions the acceptability of evidence of the findings set forth by E G & G Bionomics, a firm which performed an examination to determine existing diversity of benthic macroinvertebrates. Those results are reported in Petitioner's Exhibit 13, a 1980 report. They were not accepted as evidence of the specific findings within that report in that they were not the subject of discussion by persons who authored that report. The use was limited to corroboration of the opinion by Dr. Pollman and Schulze as to water quality considerations and they were not Crucial to their opinions. Moreover, it was not necessary for the applicant to perform a more recent bioassay in order to give reasonable assurance to DER concerning water quality matters or to establish the implications of the influence of contaminants within the sediment found in the basin related to benthic macroinvertebrates. The biological integrity of the basin area was at risk prior to the proposal for maintenance dredging. The relevant inquiry is the influence of the dredging activities on the biological integrity in the Intercoastal Waterway and those activities do not place organisms within the Intercoastal Waterway in peril. Any synergistic aspects of metals which act as toxins, for example, the increase in the aggregate value of the toxicity of zinc and cadmium, compared to their individual implications as toxins, will not present problems with water quality in the Intercoastal Waterway. Petitioner takes issue with the proposed disposition of the dredge material at an ocean site. While an appropriate upland disposal site would be preferred, it is not mandated. The approved EPA disposal site within federal jurisdiction is acceptable. Petitioner in its fact proposals found at paragraphs 36-39 (incorporated by this reference) points out violations of water quality standards for cadmium, mercury, and aluminum, and other possible violations of the standard for mercury. This information does not cause a change of opinion about the acceptability of the project in terms of reasonable assurances. There is no indication that oils and greases will present a problem related to water quality standards. The project is not contrary to public interest in that: (a) the project will not adversely affect the public health, safety, welfare or the property of others; (b) the project will not adversely affect the conservation of fish and wildlife, including endangered or threatened species, or their habitat; (c) the project will not adversely affect navigation or the flow of water or cause harmful erosion of shoaling; (d) the project will not adversely affect the fishing or recreational values or marine productivity in the vicinity of the project; (e) the project will be of a temporary nature; (f) the project will not adversely affect significant historical and archaeological resources under the provisions of s. 267.061; (g) the project is in no other way contrary to the public interest. The purpose of this fact finding does not include the issue of whether there are ongoing violations of state water quality standards associated with the business activity of the applicant, that not being the subject of the hearing. In any event, the testimony of Dr. Pollman established that the operations of JSI are not causing water quality problems associated with the parameters of cadmium, copper, aluminum, mercury, lead, chromium, tin, zinc or iron related to the Intercoastal Waterway. The influences of the business activities associated with those parameters within the basin are not understood when the evidence presented is examined but are not found to be essential to the resolution of this dispute.

Recommendation Having considered the facts, and the conclusions of law, it is, RECOMMENDED: That DER issue a final order which grants the requested maintenance dredging permit in keeping with the safeguards described in the fact finding of this recommended order. DONE AND ORDERED this 16th day of October 1986 at Tallahassee, Florida. CHARLES C. ADAMS, Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 16th day of October 1986. APPENDIX TO RECOMMENDED ORDER IN CASE NO. 86-0365 Having examined the proposed facts submitted by the parties, those proposals have been found as fact with the exception of the following which are distinguished: Petitioner's facts Paragraph 1: Subordinate to fact finding. Paragraph 2: The first sentence in this paragraph is rejected because the fact is not found within the indicated exhibits, nor can that fact be fairly inferred. Paragraphs 9, 10, 11, 14, and 15: Except for the last sentence in that latter paragraph are subordinate to facts found. Paragraph 15: The last sentence: Contrary to facts found. Paragraph 18: The last sentence: Subordinate to fact finding. Paragraphs 21, 22, 23, 24, 25 and 26: Subordinate to fact finding. Paragraph 27: Contrary to facts found. Paragraphs 28, 29, 30 and 31: Subordinate to fact finding. Paragraph 32: Not necessary to dispute resolution. Paragraphs 33 and 34: Subordinate to fact finding. Paragraph 35: Contrary to facts found. Paragraphs 40, 41 and 42: Subordinate to fact finding. Paragraphs 44, 45: Not necessary to dispute resolution. Paragraph 47: The first two sentences are information that is not sufficiently credible to allow application to the issues of the present case. Paragraphs 48, 49, 50 and 51: Not necessary to dispute resolution. Paragraph 52: Reject as fact. Paragraph 54: Contrary to facts found. Paragraph 55: Not necessary to dispute resolution. JSI and DER facts Paragraph 2: Pertaining to sentence 8 and the last phrase within sentence 11; Not necessary to dispute resolution. Paragraph 3: As to the first sentence, fourth sentence and seventh sentence; Not necessary to fact resolution. Paragraphs 4, 5 and 6 to the colon in paragraph 6: Not necessary to dispute resolution. The remaining portions of paragraph 6 are subordinate to fact finding. Paragraph 10: as to the last two sentences; Not necessary to dispute resolution. Paragraph 13: As to the next to the last sentence; Not necessary to dispute resolution. Paragraph 14: As to the fourth sentence and the last sentence; Not necessary to dispute resolution. Paragraphs 16, 17, 18 and 20: Subordinate to fact finding. Paragraph 21: Sentence 3 is subordinate to fact finding sentence 4 is not necessary to dispute resolution; sentences 5 and 6 are subordinate to fact finding. Paragraph 22: Next to the last sentence; Not necessary to dispute resolution. Paragraphs 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 38 and 41: Subordinate to fact finding, except the comments in the last sentence of paragraph 41 related to the operations of JSI causing or contributing elevated concentrations of parameters within the basin which is not found as fact. Paragraphs 42, 43 and 44: Subordinate to fact finding. COPIES FURNISHED: Kenneth G. Oertel, Esquire Chris Bryant, Esquire OERTEL AND HOFFMAN, P.A. Post Office Box 6507 Tallahassee, Florida 32314-6507 Thomas M. Baumer, Esquire Deborah Barton, Esq. GALLAGHER, BAUMER, MIKALS, BRADFORD, CANNON AND WALTER, P.A. 252-5 Independent Square Jacksonville, Florida 32202 Bradford L. Thomas, Esquire Assistant General Counsel Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32301 Victoria Tschinkel, Secretary Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32301

Florida Laws (4) 120.57267.061403.03190.704
# 8
BURNT STORE ISLES ASSOCIATION, INC. vs W. B. PERSICO AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 90-003093 (1990)
Division of Administrative Hearings, Florida Filed:Port Charlotte, Florida May 21, 1990 Number: 90-003093 Latest Update: Nov. 09, 1990

The Issue The issue for consideration in this hearing is whether the Respondent, W. B. Persico, should be issued a permit to construct a commercial marina as described in the Department's Intent to Issue, in Class III waters of the state in Charlotte County, Florida.

Findings Of Fact At all times pertinent to the issues herein, the Petitioner, Burnt Store Isles Association, Inc., was an association of property owners whose property is located in the Burnt Store Isles subdivision located in Charlotte County, Florida. The applicant, W. B. Persico, is the owner of a piece of property located adjacent to the subdivision and applicant for a permit to construct a marina on his property. The Department of Environmental Regulation is the state agency responsible for the regulation and permitting of dredge and fill activities in the waters of the state. Mr. Persico's property is located on a dead end basin canal in Charlotte County, Florida. The canal is a Class III water but is not classified as an Outstanding Florida Water. On July 31, 1989, Mr. Persico applied to the Department for a permit to construct a 75 slip, 5660 square foot commercial marina on his property within this artificial, dead end basin. Because of objections by the Department to several aspects of the proposed project, on February 27, 1990, Mr. Persico submitted a modification proposal in which he eliminated the use of pressure treated lumber for pilings, substituting concrete pilings; incorporated boat lifts in each slip; reduced the number of slips from 75 to 65; committed himself to installing a sewage pump-out facility at the site; committed to creating an inter-tidal littoral shelf planted with mangroves; agreed to face the existing vertical bulkhead seawall in the basin with rip-rap; and incorporated a commitment to include, as a part of his rental contract, long term agreements prohibiting vessel maintenance and liveaboards on boats at the site, and insuring the perpetual use of boat lifts and pump out facilities provided. He now proposes to market the marina as a condominium ownership operation. The basin in which the Persico project is proposed is 136 feet across at the entrance, (the narrowest point), and 326 feet across at the widest point. The length of the basin is more than 900 feet. The docking structure to be created will have fingers extending no more than 39 feet into the water from the existing vertical seawall. It will have a 4 foot wide walkway parallel to and 10 feet from the existing seawall from which the arms will extend 25 feet into the basin. The basin which is the proposed location for the marina is at the end of the easternmost canal in the Burnt Store Isles subdivision. It is located just west of and parallel to US Route 41, and at the entrance point, joins a perimeter waterway which meanders approximately 1 mile seaward toward a lock which joins that waterway to Alligator Creek which is an Outstanding Florida Water. The waterway from the basin through the lock into Alligator Creek and thereafter to the Gulf provides the only navigable access for most vessels moored in the Burnt Store canals and which would be moored in the proposed marina between Charlotte Harbor and the Gulf of Mexico. The lock which joints the Burnt Store canals to Alligator Creek consists of two hydraulically operated swinging gates which are operated by a boater entering or exiting the canal system. This lock was constructed as a part of a 1973 agreement between Punta Gorda Isles, Inc., a developer, and the state to prevent the construction and runoff polluted waters of the canal from freely mingling with the Outstanding Florida Water in Alligator Creek. The lock is now maintained in an open position from November 15 to May 15 because boaters complained of the inconvenience of having to operate the lock system. Available evidence indicates that a complete passage through the lock, one way when closed, takes 15 minutes. No more than 24 boats can complete a round trip in a 12 hour boating day. When the lock is open there is no appreciable delay. The residential lots which abut the Burnt Store canals are still mostly vacant. The City of Punta Gorda has assumed the responsibility of conducting a 5 year water quality monitoring program which was previously agreed to by Punt Gorda Isles, Inc. when the lock was built. The 1973 agreement was amended in 1984 to permit the operation of the lock in a closed position for an entire year if water quality monitoring should indicate a degradation of water quality in either Alligator Creek of the Burnt Store Isles canals. This has not been necessary. The Petitioners fear that pollution generated by the addition of 65 additional boats moored at and operating from the proposed marina will cause the Department to implement that clause and order the lock to operate from a closed position year round. This does not mean that the lock would not be opened for boats, but that it would be closed when not being used. Petitioners contend that the increased usage would create an intolerable traffic jam at the lock which would, for the most part, make their use of the waterway to the Gulf intolerable. Mr. Persico is a former road and bridge contractor. Though he has never owned a marina, at one time he rehabilitated one in the Chicago area. He has owned the property in question here for four years and now plans to develop a condominium ownership marina. When he decided to do so, he hired Mr. James M. Stilwell, an environmental consultant, to prepare and submit to the Department the application for the required dredge and fill permit. Initial discussions between Mr. Stilwell and the Department dealt with many environmental issues. Mr. Stilwell pointed out that the water in the canal might already be stale and avenues were explored to mitigate that problem. They did not discuss the type of docks to be installed or the potential for destruction of mangrove stands along the seawall, but even though the original plan called for the docks to be placed against the seawall, it was to be done in such a way as not to disturb the mangroves. The modified plan removing the docks to a point 10 feet off from the wall will obviate any damage to the mangroves. Admittedly, the original submittal prepared by Mr. Stilwell contained factors which were considered unacceptable to the Department. These included construction of the finger piers with pressure treated wood. To eliminate possible pollution from leaching, the pressure treated wood was replaced with a floating dock using concrete pilings. Liveaboards, and the potential contamination from that activity, have been prohibited. The provision and required use of a sewage pump-out facility should prevent any escape of polluting sewage into the waters of the basin. The use of power hoists at each slip should prevent pollution from bottom paint leaching, and boat maintenance at the marina is to be prohibited. Fueling of the vessels will not be permitted at the site thereby obviating the potential of polluting fuel spills. The construction of a 10 foot wide littoral shelf, planted with mangroves, between the dock and the sea wall will provide increased water filtration and improve water quality. It would also help the development of the fish and wildlife population and would reduce the flushing time. Air released into the water from the use of the boat lifts should add oxygen and contribute to improved water quality. At the present time, the ambient water quality in the basin, as it pertains to dissolved oxygen, is probably below standards in the lower depths of the basin, and of the outside channels as well, due to poor light penetration. The channel depth is anywhere from 20 to 25 feet. The oxygen level at the bottom is undoubtedly depleted. Mangroves are currently located along 300 feet of the 1,300 foot seawall. Mr. Stilwell's proposal, and that approved by the Department, does not call for removal of the mangroves, but they would be built around or possibly trimmed. Mr. Stilwell is of the opinion that provision for trimming of the mangroves is inherent in the granting of the permit though such permission was not specifically sought. There is no evidence to contradict this thesis. Water quality issues were raised subsequent to the filing of the original application, and the facility as now planned is designed to minimize impacts on the environment as best as can be done. Water quality would be improved, or at worst not adversely affected, by the prohibitions against liveaboards and fueling, the provision of boat lifts and a pump station, and the prohibition against other structures beyond the dock and slips. Flushing of the water is important considering the fact that the dissolved oxygen content in the water is already low. However, Mr. Stilwell is satisfied, and it would so appear, that water quality would be improved by the implementation of the proposals as included in the conditions to the permit. Mr. Stilwell, admittedly, did no dissolved oxygen tests because they were not considered as a part of the permit application. If the Department requests them, they are done, but they were not requested in this case. It is clear that the original application did not address all the environmental concerns that Petitioners feel are pertinent. Nonetheless, those items already discussed were treated, as were turbidity control during construction. As to others of concern to Petitioners, many are included in the state standards and need not be specifically addressed in the application. The Department considered the application in light of the state standards, and by the use of the conditions appended to the Intent to Issue, provided for the water quality and other environmental standards to be sufficiently addressed and met. In his February 22, 1990 letter to the Department, Mr. Stilwell directly addressed the public interest concerns including the mangroves and the construction of the littoral shelf. The Department was satisfied that the public interest criteria were met, and considered the plans to be environmentally sound. They appear to be so. Petitioners have raised some question as to the effect of the 39 foot long dock fingers interfering with navigation within the basin. Mr. Stilwell does not feel that the facility would create this problem, even at the narrowest point, and it is so found. The width of the canal there is 136 feet. The portion of the slip designed to accommodate vessels is no more than 25 feet long, and presumably, vessels of a length much greater than that would not visit the basin. Even subtracting 39 feet from the 136 feet narrow point, 97 feet of turning space remains, and this is almost four times the length of the normal vessel anticipated in the basin. Mr. Stilwell did not address the subject of the lock as it relates to navigation, but primarily as it relates to the impact on water quality and the environment. Nonetheless, he is of the opinion, and there is no evidence to the contrary, that keeping the lock open on a year round basis would not trigger a change to the ongoing program under the agreement between the state and Punta Gorda Isles and result in the lock being closed year round. Mr. Shultz, the environmental specialist with the Department, reviewed the application here initially for file completeness, and when all required information was in, made a site visit. He evaluated the application and the attachments for permitability. For Class III waters, the project must meet water quality standards outlined in the Department's rules. Only one of the water quality criteria, that of dissolved oxygen, was shown to be not met. Since the water was already below that standard, the test to be applied then is whether the project will create some improvement." In Mr. Shultz' opinion, planting the mangroves, as proposed by the applicant, does this, as does the use of the lifts. The existing mangroves will not be impacted by the project as it is proposed, and the use of rip-rap, as proposed, will provide additional surface area for organisms which will improve the water quality. When first reviewed, the Department had some concern about on-water storage of boats. These concerns were treated by the use of hoists to hold the boats out of the water when not in use, and as a result, pollutants will not be introduced by bottom paint leaching and, presumably, bilge pumping. Standard conditions included in all Department Intents to Issue, require the project to comply with applicable state water quality standards or to give assurances that such general standards for surface waters and Class III waters will be met. In this case, Mr. Shultz is satisfied that the applicant has demonstrated that water quality standards will be maintained, and there was no evidence presented by the Petitioners to contradict this. Once water quality standards are shown to be protected, then the project is balanced against the public interest criteria outlined in the statute. Here, the requirement is for a showing that the project is not contra to the public interest. It does not, because of its nature, require a positive showing that the project is in the public interest. In his opinion this project, as modified, will not adversely affect the health, safety and welfare of the public, (it will have no environmental effect on other property). It will not adversely affect the conservation of fish or wildlife in their habitats, (the planting of mangroves will provide a net improvement to species habitat in the area). The project will not adversely affect navigation, flow of water, or erosion, (the width and length of the dock system appear to pose no threat to navigation in the basin and there would appear to be no obstruction or potential therefor as a result of this project; the project is within a no-wake zone; and the size of vessels is limited by the slip size). The permit will not adversely affect marine productivity, (there is currently very little productivity in the area now since waters below 0 depth of 6 feet are already low in oxygen, and the project would, at least minimally, improve this condition). The project is permanent and would not adversely affect historical or archeological resources in the area, (there are no objects or known resources in the area, but a standard condition in the permit requires immediate notification if known resources or objects are found). The project would not adversely affect the current condition and relative value of functions being performed in the area since the area is currently a real estate development which is far from completely built. Based on his consideration of these criteria, Mr. Shultz concludes that the project is not contrary to the public interest and this appears to be a valid conclusion. There appears to be no evidence of sufficient weight, presented by the Petitioners, either through direct evidence or through cross examination of the applicant and Department witnesses that would tend to diminish the credibility of Mr. Shultz' analysis. If there are subsequent violations, the Department has enforcement action available. There is, consistent with the multiple use zoning category applied to the area across the basin from the marina, the potential for up to an additional 100 docks to be constructed in the basin beyond those treated here. Nonetheless, the Department does not consider 165 boats to be a problem either in the basin or at the lock. This is not necessarily a supportable conclusion, however. Those 100 additional docks do not currently exist and their potential should not be considered in determining whether to approve the permit under consideration here. In opposition to the applicant, Mr. Konover and Mr. Forsyth both indicated that the addition of 65 more boats would seriously overtax the operation of the lock and make it difficult, if not hazardous, to operate boats in that area between the Burnt Store Isles subdivision and Alligator Creek. Both individuals agree, and it is so found, that in general, motor boats pollute to some degree the waters on which that are operated as a result of oil leaks from engine operation, leakage of bilge oil, escape of sewage, and leaching of copper paint and other solvents. In addition, manatee have been seen in the area, and the increase of boating operations could present some hazard to the manatee population. There is, however, no indication that a manatee population is permanently in residence there or is even there frequently. It is also accepted that boat wake has an adverse effect on sea walls, and all of these factors should have been and, in fact were, considered in the analysis of the permitability of the project. The concerns of Mr. Konover and Mr. Forsyth were echoed by Mr. Gunderson who, over 30 years operating boats, has seen what he considers to be a definite lack of concern for the environment by many boaters who pump bilges directly into the water, throw debris overboard, and use detergents to wash their boats at marinas. He is of the opinion that renters of slips are generally less concerned about water quality than those who live on the water, and take a more cavalier approach to water quality standards. These sentiments are also held by Mr. Young who, over the years, has owned marinas in Connecticut and has observed the approach of nonowning slip users to the water at their disposal. His concerns could be met by the strict enforcement of standards at the marina. Mr. Powell, a nurseryman who owns the lot across the basin from the site of the proposed marina, fishes from his lot and has observed the an increase of pollution in the canal. He routinely sees floating dead fish, palm leaves, cocoanuts, bottles, slicks and other debris, and though he owns a multifamily lot, would have a difficult time putting in many slips since his lot, at the entrance to the basin at the narrow point, would be across from the slips proposed by applicant and their proximity would, he feels, hinder his ability to build out into the basin as well.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is, therefore: RECOMMENDED that the Department of Environmental Regulation enter a Final Order issuing Permit No. 081679445, to W. B. Persico as modified and outlined in the Intent to Issue dated March 16, 1990. RECOMMENDED this 9 day of November, 1990, in Tallahassee, Florida. ARNOLD H. POLLOCK, Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 9 day of November, 1990. APPENDIX TO RECOMMENDED ORDER IN CASE NO. 90-3093 The following constitutes my specific rulings pursuant to S 120.59(2), Florida Statutes, on all of the Proposed Findings of Fact submitted by the parties to this case. FOR THE PETITIONER: 1. & 2. Accepted and incorporated herein. 3. & 4. Accepted. Accepted but applicable only when the locks are closed. Accepted. - 9. Accepted and incorporated herein. Accepted. & 12. Accepted and incorporated in substance herein. 13. & 14. Accepted and incorporated herein. Accepted and incorporated herein. Rejected as contrary to the weight of the evidence. Accepted and incorporated herein. & 19. Accepted and incorporated herein. 20. & 21. Unsupported by convincing evidence of record. Accepted as valid when the lock is operated from a closed position. However, the evidence indicates that currently the lock is left open from November 15 to May 15 of each year and this does not cause delay. Accepted if the lock is operated from a closed position. Unsupported by convincing evidence of record. FOR THE APPLICANT: 1. - 6. Accepted and incorporated herein. 7. - 15. Accepted and incorporated herein. Accepted and incorporated herein. & 18. Accepted and incorporated herein. Accepted and incorporated herein. Accepted. Accepted. - 32. Accepted and incorporated herein. FOR THE DEPARTMENT: Accepted. and incorporated herein. - 4. Accepted and incorporated herein. Accepted and incorporated herein. Accepted and incorporated herein. Accepted and incorporated herein. & 9. Accepted and incorporated herein. 10. - 14. Accepted and incorporated herein. 15. - 18. Accepted and incorporated herein. COPIES FURNISHED: Joseph F. Lynch Burnt Store Isles Association, Inc. P.O. Box 956 Punta Gorda, Florida 33951-0956 Michael P. Haymans, Esquire P.O. Box 2159 Port Charlotte, Florida 33949 Cecile I. Ross, Esquire Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Dale H. Twachtmann Secretary Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Daniel H. Thompson General Counsel Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32399-2400

Florida Laws (2) 120.57267.061
# 9
MARTIN COUNTY AND ST. LUCIE COUNTY vs ALL ABOARD FLORIDA - OPERATIONS, LLC; FLORIDA EAST COAST RAILWAY, LLC; AND SOUTH FLORIDA WATER MANAGEMENT DISTRICT, 16-005718 (2016)
Division of Administrative Hearings, Florida Filed:West Palm Beach, Florida Sep. 30, 2016 Number: 16-005718 Latest Update: Nov. 16, 2017

The Issue The issues to be determined in these consolidated cases are whether All Aboard Florida – Operations, LLC (“the Applicant”), and Florida East Coast Railway, LLC (“FECR”), are entitled to an Environmental Resource Permit Modification authorizing the construction of a stormwater management system and related activities to serve railway facilities, and a verification of exemption for work to be done at 23 roadway crossings (collectively referred to as “the project”).

Findings Of Fact The Parties Petitioners Martin County and St. Lucie County are political subdivisions of the State of Florida. Petitioners have substantial interests that could be affected by the District’s proposed authorizations. Intervenor Town of St. Lucie Village is a political subdivision of the State of Florida. Intervenor has substantial interests that could be affected by the District’s proposed authorizations. The Applicant, All Aboard Florida – Operations, LLC, is a Delaware limited liability company based in Miami. All Aboard Florida is part of a group of corporate entities formed for the principal purpose of developing and operating express passenger train service in Florida. Co-applicant Florida East Coast Railway, LLC, is a Florida limited liability company based in Jacksonville. FECR owns the existing railway corridor the passenger train service will use between Miami and Cocoa. South Florida Water Management District is a regional agency granted powers and assigned duties under chapter 373, part IV, Florida Statutes, including powers and duties related to the regulation of construction activities in wetlands. The proposed activities are within the boundaries of the District. Background The objective of the All Aboard Florida Project is to establish express passenger train service connecting four large urban areas: Miami, Fort Lauderdale, West Palm Beach, and Orlando. Most of the passenger service route, including the portion which will pass through Martin County and St. Lucie County, will use an existing railroad right-of-way used since the late 1800s. The FECR rail corridor runs along Florida’s east coast from Miami to Jacksonville. It supported passenger and freight operations on shared double mainline tracks from 1895 to 1968. The passenger service was terminated in 1968 and portions of the double track and certain bridge structures were removed. The freight service continued and remains in operation today. The passenger service will use the FECR right-of-way from Miami to Cocoa and then turn west on a new segment to be constructed from Cocoa to Orlando. The railway corridor will be operated as a joint facility, with passenger and freight trains sharing the double mainline tracks. The Applicant is upgrading the portion of the corridor between Miami and Cocoa by, among other things, replacing existing railroad ties and tracks, reinstalling double mainline tracks, and improving grade crossings. The Applicant is also installing Positive Train Control systems which provide integrated command and control of passenger and freight train movements and allow the trains to be directed and stopped remotely or automatically in the event of operator error or disability, or an obstruction on the track. The All Aboard Florida Project is being developed in two phases, Phase I extends from Miami to West Palm Beach, and Phase II from West Palm Beach to Orlando. This proceeding involves a segment within Phase II, known as Segment D09, which runs from just north of West Palm Beach to the northern boundary of St. Lucie County. The railway corridor in Segment D09 passes through Jonathan Dickinson State Park in Martin County and the Savannas Preserve State Park, parts of which are in both Martin County and St. Lucie County. Surface waters within these state parks are Outstanding Florida Waters (“OFWs”). The railway in Segment D09 also passes over the St. Lucie River using a bridge that can be opened to allow boats to pass. The Applicant plans to run 16 round trips per day between Miami and Orlando, which is about one train an hour in each direction, starting early in the morning and continuing to mid-evening. In 2013, the District issued the Applicant an exemption under section 373.406(6), which exempts activities having only minimal or insignificant adverse impacts on water resources. The 2013 exemption covers proposed work in approximately 48 of the 65 miles which make up Segment D09, and includes replacement of existing tracks and re-establishment of a second set of mainline tracks where they were historically located. The 2013 exemption covers all but 24 of the roadway crossings within Segment D09 where work is to be done in connection with the All Aboard Florida Project. In 2015, the District issued the Applicant a general permit under rule 62-330.401, which authorizes activities that are expected to cause minimal adverse impacts to water resources, for the installation of fiber optic cable along the rail bed within Segment D09. The 2013 exemption and 2015 general permit were not challenged and became final agency action. The Proposed Agency Actions The ERP Modification covers work to be done in approximately 17 of the 65 miles which make up Segment D09. The work will consist primarily of replacing existing tracks, installing new tracks, making curve modifications in some locations to accommodate faster trains, culvert modifications, and work on some fixed bridge crossings over non-navigable waters. The 2017 Exemption at issue in this proceeding covers improvements to 23 of the 24 roadway crossings that were not covered by the 2013 exemption. Proposed improvements at Southeast Florida Street in Stuart will be permitted separately. The improvements covered by the 2017 Exemption include upgrading existing safety gates and signals; installing curbs, guardrails, and sidewalks; resurfacing some existing paved surfaces; and adding some new paving. Petitioners argue that, because the District’s staff report for the ERP Modification states that the ERP does not cover work at roadway crossings, track work at roadway crossings has not been authorized. However, the staff report was referring to the roadway improvements that are described in the 2017 Exemption. The proposed track work at the roadway crossings was described in the ERP application and was reviewed and authorized by the District in the ERP Modification. “Segmentation” Petitioners claim it was improper for the District to separately review and authorize the proposed activities covered by the 2013 exemption, the 2015 general permit, the ERP Modification, and the 2017 Exemption. Petitioners contend that, as a consequence of this “segmentation” of the project, the District approved “roads to nowhere,” by which Petitioners mean that these activities do not have independent functionality. Petitioners’ argument is based on section 1.5.2 of the Applicant’s Handbook, Volume 1,1/ which states that applications to construct phases of a project can only be considered when each phase can be constructed, operated, and maintained totally independent of future phases. However, the activities authorized by the four agency actions are not phases of a project. They are all parts of Phase II of the All Aboard Florida Project, which is the passenger railway from West Palm Beach to Orlando. Section 1.5.2 is not interpreted or applied by the District as a prohibition against separate review and approval of related activities when they qualify under the District’s rules for exemptions, general permits, and ERPs. Much of Phase II is outside the District’s geographic boundaries and, therefore, beyond its regulatory jurisdiction. The District can only review and regulate a portion of Phase II. The District is unable to review this portion as a stand-alone railway project that can function independently from other project parts. The Proposed Stormwater Management System Where the Applicant is replacing existing tracks or re- establishing a second set of tracks, it will be laying new ties, ballast, and rail on previously-compacted earth. In those areas, no stormwater management modifications were required by the District. The Applicant’s new proposed stormwater management system will be located in a five-mile area of the corridor where an existing siding will be shifted outward and used as a third track. In this area, swales with hardened weir discharge structures and skimmers will be installed to provide stormwater treatment beyond what currently exists. The weir discharge structures will serve to prevent erosion at discharge points. The skimmers will serve to capture any floating oils or refuse. Because the FECR right-of-way is not wide enough in some three-track areas to also accommodate swales, the proposed stormwater management system was oversized in other locations to provide compensating volume. The District determined that this solution was an accepted engineering practice for linear systems such as railroads. Petitioners argue that the Applicant’s proposed stormwater management system is deficient because some of the proposed swales do not meet the definition of “swale” in section 403.803(14) as having side slopes equal to or greater than three feet horizontal to one foot vertical (3:1). The statute first defines a swale to include a manmade trench which has “a top width-to-depth ratio of the cross-section equal to or greater than 6:1.” The swales used in the proposed stormwater management system meet this description. Petitioners showed that the plans for one of the 46 proposed swales included some construction outside the FECR right-of-way. In response, the Applicant submitted revised plan sheets to remove the swale at issue. The Emergency Access Way The ERP application includes proposed modifications to portions of an existing unpaved emergency access way which runs along the tracks in some areas. The access way is a private dirt road for railroad-related vehicles and is sometimes used for maintenance activities. At the final hearing, Petitioners identified an inconsistency between an application document which summarizes the extent of proposed new access way construction and the individual plan sheets that depict the construction. The Applicant resolved the inconsistency by correcting the construction summary document. Petitioners also identified an individual plan sheet showing proposed access way modifications to occur outside of the FECR right-of-way. This second issue was resolved by eliminating any proposed work outside the right-of-way. Petitioners believe the proposed work on the access way was not fully described and reviewed because Petitioners believe the access way will be made continuous. However, the access way is not continuous currently and the Applicant is not proposing to make it continuous. No District rule requires the access way segments to be connected as a condition for approval of the ERP. Water Quantity Impacts An applicant for an ERP must provide reasonable assurance that the construction, operation, and maintenance of a proposed project will not cause adverse water quantity impacts to receiving waters and adjacent lands, adverse flooding to on-site or off-site property, or adverse impacts to existing surface water storage and conveyance capabilities. The District’s design criterion to meet this requirement for water quantity management is a demonstration that the proposed stormwater system will capture the additional runoff caused during a 25-year/3-day storm event. The Applicant’s proposed stormwater system meets or exceeds this requirement. Petitioners argue that the Applicant failed to provide reasonable assurance because the ERP application materials did not include a calculation of the discharge rates and velocities for water discharging from the swales during the design storm. The ERP application contains the information required to calculate the discharge rates and velocities and the Applicant’s stormwater expert, Bruce McArthur, performed the calculations and testified at the final hearing that in the areas where there will be discharges, the discharge rates and velocities would be “minor” and would not cause adverse impacts. The District’s stormwater expert, Jesse Markle, shared this opinion. Petitioners argue that this information should have been provided to the District in the permit application, but this is a de novo proceeding where new evidence to establish reasonable assurances can be presented. Petitioners did not show that Mr. McArthur is wrong. Petitioners failed to prove that the proposed project will cause adverse water quantity impacts, flooding, or adverse impacts to surface water storage and conveyance capabilities. Water Quality Impacts To obtain an ERP, an applicant must provide reasonable assurance that the construction, operation, and maintenance of a regulated project will not adversely affect the quality of receiving waters, such that state water quality standards would be violated. The District’s design criteria for water quality required the Applicant to show that its proposed stormwater system will capture at least 0.5 inches of runoff over the developed area. To be conservative, the Applicant designed its proposed system to capture 1.0 inch of runoff in most areas. Under District rules, if a stormwater system will directly discharge to impaired waters or OFWs, an additional 50 percent of water quality treatment volume is required. The proposed stormwater system will not directly discharge to either impaired waters or OFWs. In some locations, there is the potential for stormwater discharged from the proposed stormwater system to reach OFWs by overland flow, after the stormwater has been treated for water quality purposes. The Applicant designed its proposed stormwater system to provide at least an additional 50 percent of water quality treatment volume in areas where this potential exists. To ensure that the proposed construction activities do not degrade adjacent wetlands, other surface waters, or off-site areas due to erosion and sedimentation, the Applicant prepared an Erosion and Sediment Control Plan. Temporary silt fences and turbidity barriers will be installed and maintained around the limits of the construction. The District’s design criteria for water quality do not require an analysis of individual contaminants that can be contained in stormwater, except in circumstances that do not apply to this project. Compliance with the design criteria creates a presumption that water quality standards for all potential contaminants are met. See Applicant’s Handbook, V. II, § 4.1.1. Although not required, the Applicant provided a loading analysis for the proposed swales which could potentially discharge overland to impaired waters or OFWs. The analysis compared pre- and post-development conditions and showed there would be a net reduction in pollutant loading. Petitioners believe the pollutant loading analysis was inadequate because it did not specifically test for arsenic and petroleum hydrocarbons. However, the analysis was not required and adequate treatment is presumed. Petitioners did not conduct their own analysis to show that water quality standards would be violated. Petitioners’ expert, Patrick Dayan, believes the compaction of previously undisturbed soils in the emergency access way would increase stormwater runoff. However, he did not calculate the difference between pre- and post-construction infiltration rates at any particular location. His opinion on this point was not persuasive. Petitioners failed to prove that the proposed project will generate stormwater that will adversely affect the quality of receiving waters such that state water quality standards would be violated. The preponderance of the evidence shows the project complies with District design criteria and will not cause water quality violations. Soil and Sediment Contamination Petitioners argue that the ERP Modification does not account for the disturbance of existing contaminants in soils and sediments that could be carried outside of the right-of-way and into OFWs. Petitioners’ argument is based on investigations by their geologist, Janet Peterson, who collected soil, sediment, and surface water samples at 13 sites along the FECR rail corridor in the vicinity of OFWs, or surface waters that eventually flow into OFWs. During her sampling visits, Ms. Peterson saw no visual evidence of an oil spill, fluid leak, or other release of hazardous materials. Ms. Peterson compared her soil sample results to the Residential Direct Exposure Soil Cleanup Target Levels (“SCTLs”) established in rule 62-777. The SCTLs are the levels at which toxicity becomes a human health concern and the residential SCTLs assume soil ingestion of 200 mg/day for children, and 100 mg/day for adults, 350 days a year, for 30 years. Some of the soil sampling results showed exceedances of SCTLs, but the SCTLs are not applicable here because none of the sample sites are locations where children or adults would be expected to ingest soil at such levels for such lengths of time. Petitioners did not show that the contaminants are likely to migrate to locations where such exposure would occur. Ms. Peterson compared her soil sample results to the Marine Surface Water Leachability SCTLs, but she did not develop site-specific leachability-based SCTLs using DEP’s approved methodology. Nor did she show that the proposed project will cause the soils to leach the contaminants. Ms. Peterson collected sediment samples from shorelines, but not where construction activities are proposed. She compared her sediment sample results to the Florida Department of Environmental Protection’s (“DEP”) Sediment Quality Assessment Guidelines (“SQAGs”). These guidelines are not water quality standards. Any exceedance of these guidelines requires further analysis to determine potential water quality impacts. Ms. Peterson did not conduct the analysis. Ms. Peterson acknowledged that there are numerous sources for these pollutants at or near her sample sites, such as high-traffic roads, vehicular bridges, commercial and industrial facilities, boatyards, and golf courses. She did not establish baselines or controls. Ms. Peterson collected surface water samples at seven sites, some of which were located outside the FECR right-of-way. The results showed levels of phosphorous and nitrogen above the criteria for nutrients at some locations. Phosphorous, nitrogen, and the other nutrients are prevalent in the waters of Martin County and St. Lucie County and come from many sources. Petitioners’ evidence focused on existing conditions and not expected impacts of the proposed project. The evidence was insufficient to prove the proposed project will cause or contribute to water quality violations. Functions Provided by Wetlands and Other Surface Waters An applicant for an ERP must provide reasonable assurance that a proposed project will not adversely impact the value of functions provided to fish and wildlife and listed species by wetlands and other surface waters. Petitioners claim the Applicant and District should not have relied on Florida Land Use Cover and Forms Classification System (“FLUCCS”) maps to identify and characterize wetlands and other habitat areas because the maps are too general and inaccurate. However, the FLUCCS maps were not used by the Applicant or District to evaluate impacts to wetlands or other habitats. The Applicant began its evaluation of impacts to wetlands and other habitat areas by field-flagging and surveying the wetland and surface water boundaries in the project area using a GPS device with sub-meter accuracy. It then digitized the GPS delineations and overlaid them with the limits of construction to evaluate anticipated direct impacts to wetlands and other surface waters. The District then verified the delineations and assessments in the field. The Applicant and District determined that there are a total of 4.71 acres of wetlands within the FECR right-of-way, including tidal mangroves, freshwater marsh, and wet prairie. They also determined the proposed project will directly impact 0.35 acres of wetlands, consisting of 0.09 acres of freshwater marsh and 0.26 acres of mangroves. Petitioners contend that the Applicant failed to account for all of the project’s wetland impacts, based on the wetland delineations made by their wetland expert, Andrew Woodruff. Most of the impacts that Mr. Woodruff believes were not accounted for are small, between 0.01 and 0.05 acres. The largest one is acres. The Applicant’s delineations are more reliable than Mr. Woodruff’s because the methodology employed by the Applicant had greater precision. It is more likely to be accurate. Petitioners argue that the 2013 exemption and the 2015 general permit did not authorize work in wetlands and, therefore, the impacts they cause must be evaluated in this ERP Modification. However, Petitioners did not prove that there are unaccounted-for wetland impacts associated with those authorizations. Any impacts associated with best management practices for erosion control, such as the installation of silt fences, would be temporary. The District does not include such temporary minor impacts in its direct, secondary, or cumulative impacts analyses. Most of the wetlands that would be directly impacted by the ERP Modification are degraded due to past hydrologic alterations and soil disturbances from the original construction and historical use of the FECR railway corridor, and infestation by exotic plant species. Most of these wetlands are also adjacent to disturbed uplands within or near the rail corridor. The functional values of most of the wetlands that would be affected have been reduced by these disturbances. The Applicant provided reasonable assurance that the project will not adversely impact the value of functions provided to fish and wildlife and listed species by wetlands and other surface waters. Secondary Impacts Section 10.2.7 of the Applicant’s Handbook requires an applicant to provide reasonable assurance that the secondary impacts from construction, alteration, and intended or reasonably expected uses of a proposed activity (a) will not cause or contribute to violations of water quality standards or adverse impacts to the functions of wetlands or other surface waters; (b) will not adversely impact the ecological value of uplands for bald eagles, and aquatic or wetland-dependent listed animal species for nesting or denning by these species; (c) will not cause impacts to significant historical or archaeological resources; and (d) additional phases for which plans have been submitted, and closely linked projects regulated under chapter 373, part IV, will not cause water quality violations or adverse impacts to the functions of wetlands or other surface waters. The proposed work will be entirely within the limits of the existing railway corridor where secondary impacts to wetlands and other surface waters caused by noise, vibration, fragmentation of habitats, and barriers to wildlife have existed for decades. The preponderance of the evidence shows that any increase in these kinds of impacts would be insignificant and would not reduce the current functions being provided. Because the affected wetlands are not preferred habitat for wetland-dependent, endangered, or threatened wildlife species, or species of special concern, and no such species were observed in the area, no adverse impacts to these species are expected to occur. Petitioners contend that adverse impacts will occur to the gopher tortoise, scrub jay, and prickly apple cactus. These are not aquatic or wetland-dependent species. However, the preponderance of the evidence shows any increase in impacts to these species would be insignificant. When the train bridges are closed, boats with masts or other components that make them too tall to pass under the train bridges must wait for the bridge to open before continuing. Petitioners contend that the current “stacking” of boats waiting for the bridges to open would worsen and would adversely impact seagrass beds and the West Indian Manatee. However, it was not shown that seagrass beds are in the areas where the boats are stacking. The available manatee mortality data does not show a link between boat stacking and boat collisions with manatees. Mr. Woodruff’s opinion about increased injuries to manatees caused by increased boat stacking was speculative and unpersuasive. The preponderance of the evidence shows that the adverse effects on both listed and non-listed wildlife species, caused by faster and more numerous trains would be insignificant. The activities associated with the 2013 exemption and the 2015 general permit for fiber optic cable were based on determinations that the activities would have minimal or insignificant adverse impacts on water resources. These determinations are not subject to challenge in this proceeding. The Applicant provided reasonable assurance that the secondary impacts of the project will not cause or contribute to violations of water quality standards, adversely impact the functions of wetlands or other surface waters, adversely impact the ecological value of uplands for use by listed animal species, or cause impacts to significant historical or archaeological resources. Elimination and Reduction of Impacts Under section 10.2.1.1 of the Applicant’s Handbook, if a proposed activity will result in adverse impacts to wetlands and other surface waters, the applicant for an ERP must implement practicable design modifications to eliminate or reduce the impacts, subject to certain exceptions that will be discussed below. Petitioners argue that this rule requires the Applicant and District to evaluate the practicability of alternative routes through the region, routes other than the existing railway corridor in Segment D09. As explained in the Conclusions of Law, that argument is rejected. The evaluation of project modifications to avoid impacts was appropriately confined to the railway corridor in Segment D09. The Applicant implemented practicable design modifications in the project area to reduce or eliminate impacts to wetlands and other surface waters. Those modifications included the shifting of track alignments, the elimination of certain third-track segments, and the elimination of some proposed access way modifications. However, the project qualified under both “opt out” criteria in section 10.2.1.2 of the Applicant’s Handbook so that design modifications to reduce or eliminate impacts were not required: (1) The ecological value of the functions provided by the area of wetland or surface water to be adversely affected is low, and the proposed mitigation will provide greater long-term ecological value; and (2) the applicant proposes mitigation that implements all or part of a plan that provides regional ecological value and provides greater long-term ecological value. Mitigation The Applicant proposes to mitigate for impacts to wetlands by purchasing mitigation credits from four District- approved mitigation banks: the Bluefield Ranch, Bear Point, Loxahatchee, and F.P.L. Everglades Mitigation Banks. Each is a regional off-site mitigation area which implements a detailed management plan and provides regional long-term ecological value. The number of mitigation credits needed to offset loss of function from impacts to wetlands was calculated using the Modified Wetland Rapid Assessment Procedure (“MWRAP”) or Wetland Assessment Technique for Environmental Review (“WATER”), as prescribed in the state permit for each mitigation bank. Applying these methods, the Applicant is required to purchase mitigation credits. The Applicant proposed to mitigate the adverse impacts to freshwater marsh wetlands by purchasing 0.01 freshwater herbaceous credits from the Bluefield Ranch Mitigation Bank, and 0.06 freshwater herbaceous credits from the Loxahatchee Mitigation Bank. The adverse impacts to tidal mangrove wetlands would be mitigated by purchasing 0.12 saltwater credits from the Bear Point Mitigation Bank, and 0.02 saltwater credits from the F.P.L. Everglades Mitigation Bank. The Applicant committed to purchase an additional 0.29 freshwater herbaceous credits from the Bluefield Ranch Mitigation Bank, for a total of 0.50 mitigation credits. The proposed mitigation implements a plan that will provide greater long-term ecological value than is provided by the wetlands that will be impacted. The Applicant proved by a preponderance of the evidence that the project complies with the District’s mitigation requirements. Cumulative Impacts To obtain an ERP, an applicant must provide reasonable assurance that a regulated activity will not result in unacceptable cumulative impacts to water resources. This assurance can be provided by proposing to fully mitigate the impacts within the same basin. However, when an applicant proposes mitigation in another drainage basin, the applicant must demonstrate that the regulated activity will not cause unacceptable cumulative impacts. The proposed project will adversely impact 0.02 acres of freshwater marsh wetlands and 0.21 acres of tidal mangrove wetlands in the St. Lucie River basin. The impacts to the freshwater marshes must be mitigated out-of-basin because there are no mitigation banks in the basin which offer freshwater herbaceous mitigation credits. The proposed project will adversely impact 0.07 acres of the freshwater marshes and 0.05 acres of the mangrove wetlands in the Loxahatchee River basin. Those impacts must also be mitigated out-of-basin because there are no mitigation banks in the Loxahatchee River basin. Because some of the Applicant’s proposed mitigation must be provided out-of-basin, the ERP application included a cumulative impact analysis. The analysis evaluated whether the proposed project, when considered in conjunction with other possible development within the St. Lucie River and Loxahatchee River drainage basins, would result in unacceptable cumulative impacts considering each basin as a whole. There are approximately 10,068 acres of freshwater marshes within the St. Lucie basin, of which an estimated 4,929 acres are not preserved and would be at risk of potential future development. The proposed project will adversely impact 0.02 of those acres, which is only 0.0004 percent of the total at-risk acreage. There are about 34,000 acres of freshwater marshes within the Loxahatchee River basin, of which an estimated 7,463 acres are at risk of future development, and approximately 564 acres of tidal mangrove wetlands, of which an estimated 75 acres are at risk of future development. The project will adversely impact 0.07 acres of the freshwater marshes (0.0009 percent), and 0.05 acres of the tidal mangrove wetlands (0.0667 percent). Petitioners contend the Applicant’s analysis did not account for impacts from proposed activities authorized in the 2013 and 2015 general permit. However, Petitioners failed to prove there are unaccounted-for wetland impacts. The preponderance of the evidence supports the District’s determination that the proposed project will not cause unacceptable cumulative impacts to wetlands and other surface waters. Public Interest When an applicant seeks authorization for a regulated activity in, on, or over wetlands or surface waters, it must provide reasonable assurance that the activity will not be contrary to the public interest, or if the activity is within or significantly degrades an OFW, is clearly in the public interest, as determined by balancing the following criteria set forth in section 373.414(1)(a): Whether the activities will adversely affect the public health, safety, or welfare or the property of others; Whether the activities will adversely affect the conservation of fish and wildlife, including endangered or threatened species, or their habitats; Whether the activities will adversely affect navigation or the flow of water or cause harmful erosion or shoaling; Whether the activities will adversely affect the fishing or recreational values or marine productivity in the vicinity of the activity; Whether the activities will be of a temporary or permanent nature; Whether the activities will adversely affect or will enhance significant historical and archaeological resources; and The current condition and relative value of functions being performed by areas affected by the proposed activities. The proposed work is not within an OFW, but entirely within the FECR corridor. The potential for overland flow and indirect impacts to OFWs is addressed by additional treatment of the stormwater prior to discharge. The proposed project would not significantly degrade an OFW. Therefore, the applicable inquiry is whether the project is contrary to the public interest. Factor 1: Public Safety, Safety, and Welfare Petitioners contend that the proposed project will adversely affect public health, safety, and welfare by impacting water quantity, water quality, and certain non-environmental matters such as emergency response times, traffic congestion, and potential train collisions with pedestrians and vehicles. Potential environmental impacts have been addressed above and, by a preponderance of the evidence, the District and the Applicant showed that such impacts would be insignificant or would be mitigated. As to the potential for non-environmental impacts associated with train operations, it is explained in the Conclusions of Law that the public interest test does not include consideration of non-environmental factors other than those expressly articulated in the statute, such as navigation and preservation of historical or archaeological resources. However, because evidence of non-environmental impacts was admitted at the final hearing, the issues raised by Petitioners will be briefly addressed below. The regulatory agency with specific responsibility for railroad safety is the Federal Railroad Administration (“FRA”). The FRA reviewed the safety features associated with the proposed passenger train operations, and approved them. Public safety will be enhanced at roadway crossings because of the proposed improvements and the use of modern technology in monitoring and managing the movement of trains. Petitioners contend that the addition of the passenger rail service will impede emergency response times in Martin County and St. Lucie County due to more frequent roadway closures. However, freight trains currently impede emergency response times due to their length and slow speed. The passenger trains will be much shorter in length and faster so that roadway crossing closures for passing passenger trains will be much shorter than for freight trains. The ERP Modification and 2017 Exemption do not affect freight train operations. The preponderance of the evidence shows that passenger rail service is unlikely to cause a material increase in the occurrence of circumstances where an emergency responder is impeded by a train. The current problem must be addressed through changes in freight train operations. Petitioners also contend that the passenger rail service will interfere with hurricane evacuation. The persuasive evidence does not support that contention. Train service would cease when a hurricane is approaching. Petitioners contend the trains will have to be “staged” on either side of the two moveable bridges while other trains cross, thereby blocking road intersections. However, this was a matter of speculation. The Applicant does not propose or want to stage trains at the bridges. Petitioners contend that the project will cause hazards to boaters on the St. Lucie River because there will be more times when the train bridge will be closed to allow the passage of passenger trains. Although there were many statistics presented about the number of boats affected, the evidence was largely anecdotal with respect to the current hazard associated with boaters waiting for the passage of freight trains and speculative as to the expected increase in the hazard if shorter and faster passenger trains are added. Factor 2: Conservation of Fish and Wildlife As previously found, the proposed activities will not adversely affect the conservation of fish and wildlife, including threatened or endangered species. The preponderance of the evidence shows the project will have only insignificant adverse impacts on water resources and wildlife. Factor 3: Navigation of the Flow of Water Petitioners claim the project will hinder navigation on the St. Lucie and Loxahatchee Rivers because of the increase in bridge closures if passenger trains are added. The U.S. Coast Guard is the agency with clear authority to regulate the opening and closing of moveable train bridges over navigable waters in the interests of navigation. Petitioners’ insistence that the District address the bridge openings is novel. No instance was identified by the parties where this District, any other water management district, or DEP has attempted through an ERP to dictate how frequently a railroad bridge must open to accommodate boat traffic. The Coast Guard is currently reviewing the project’s potential impacts on navigation and will make a determination about the operation of the moveable bridges. It has already made such a determination for the moveable bridge which crosses the New River in Ft. Lauderdale. Petitioners point to section 10.2.3.3 of the Applicant’s Handbook, which states that the District can consider an applicant’s Coast Guard permit, and suggest that this shows the District is not limited to what the Coast Guard has required. However, Section 10.2.3.3 explains the navigation criterion in terms of preventing encroachments into channels and improving channel markings, neither of which encompasses the regulation of train bridges. The preponderance of the evidence shows the project would not cause harmful erosion or shoaling or adversely affect the flow of water. Factor 4: Fishing, Recreational Values, and Marine Productivity The preponderance of the evidence shows that there would be no adverse impacts or only insignificant impacts to fishing or recreational values and marine productivity. Factor 5: Permanent Impact The proposed project will have both temporary and permanent impacts. The temporary impacts include the installation of silt fences and turbidity barriers designed to reduce water quality impacts and impacts to functions provided by wetlands and surface waters. The impacts due to track installation, construction and rehabilitation of the non-moveable bridges, at-grade crossing improvements, and stormwater system improvements are permanent in nature. The permanent impacts have been minimized and mitigated. Factor 6: Historical or Archaeological Resources Petitioners do not contend that the project will adversely affect significant historical or archaeological resources. Factor 7: Wetland Functions in Areas Affected Because the proposed work is within the limits of an existing railway corridor where impacts have been occurring for decades, and the majority of the wetlands to be affected are of a low to moderate quality, there would be only a small loss of functional values and that loss would be fully mitigated. Public Interest Summary When the seven public interest factors are considered and balanced, the proposed project is not contrary to the public interest. Even if Petitioners’ non-environmental issues are included, the project is not contrary to the public interest. Compliance With Other Permit Conditions The project is capable, based on accepted engineering and scientific principles, of performing and functioning as proposed. The Applicant demonstrated sufficient real property interests over the lands upon which project activities will be conducted. It obtained the required consent for proposed activities relating to bridge crossings over state-owned submerged lands. The Applicant provided reasonable assurance of compliance with all other applicable permit criteria. Exemption Verification for Roadway Crossings The Applicant’s ERP application included a mixture of activities which required an individual permit, as well as activities in roadway crossings which the Applicant claimed were exempt from permitting. Pursuant to section 5.5.3.4 of the Applicant’s Handbook, the Applicant requested a verification of exemption as to certain work to be done within 23 of those 24 roadway crossings. The District determined that the improvements for which an exemption was sought were exempt from permitting under rule 62-330.051(4)(c) for minor roadway safety construction, rule 62-330.051(4)(d) resurfacing of paved roads, and rule 62-330.051(10) for “construction, alteration, maintenance, removal or abandonment of recreational paths for pedestrians, bicycles, and golf carts.” The preponderance of the evidence shows the proposed work qualifies for exemption under these rules.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the South Florida Water Management District enter a final order that: approves Environmental Resource Permit Modification No. 13-05321-P on the terms and conditions set forth in the District’s Corrected Proposed Amended Staff Report of May 11, 2017; and approves the Verification of Exemption dated March 31, 2017. DONE AND ENTERED this 29th day of September, 2017, in Tallahassee, Leon County, Florida. S BRAM D. E. CANTER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 29th day of September, 2017.

Florida Laws (14) 120.52120.569120.57120.573120.60163.3161373.016373.069373.119373.406373.414373.427403.161403.803