PINELLAS COUNTY CONSTRUCTION LICENSING BOARD vs RAUL FERNANDEZ, JR., 12-001925 (2012)
Division of Administrative Hearings, Florida Filed:St. Petersburg, Florida May 24, 2012 Number: 12-001925 Latest Update: Oct. 04, 2024
# 1
RAFAEL R. PALACIOS vs DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION, CONSTRUCTION INDUSTRY LICENSING BOARD, 99-004163F (1999)
Division of Administrative Hearings, Florida Filed:Miami, Florida Oct. 01, 1999 Number: 99-004163F Latest Update: Jan. 08, 2001

The Issue Whether pursuant to Sections 57.111 or 120.595(1), Florida Statutes, Petitioner Rafael R. Palacios (Palacios) should be awarded reasonable costs and attorney's fees incurred in defense of an administrative proceeding against him that was initiated by the Respondent, Department of Business and Professional Regulation (Department). Whether pursuant to Section 120.595(1), Florida Statutes, Petitioner Steven L. Johns (Johns) should be awarded reasonable costs and attorney's fees incurred in defense of an administrative proceeding against him that was initiated by Respondent.

Findings Of Fact Petitioner, Steven L. Johns, is a Florida Certified General Contractor and the principal qualifier for C. G. Chase Construction Company (Chase Construction). In 1994, Chase Construction entered into a construction contract with Carnival Cruise Lines for an expansion project at the Port of Miami. Chase Construction subcontracted the mechanical work to R. Palacios & Company. Petitioner, Rafael R. Palacios, is the president, primary qualifier, and 100 percent stockholder of R. Palacios & Company. Palacios' principal place of business is located in Miami, Florida. In July and December 1998, Palacios employed less than 25 employees and had a net worth of less than $2,000,000. The contract for the Port of Miami project consisted of two phases. Phase I was to construct an arrival lobby and an enclosed walkway to a terminal. Phase II included the addition of boarding halls, the renovation of an existing elevated area, and the addition of baggage areas. A foundation permit had been pulled for Phase I. The foundation work was quickly completed, and Chase Construction representatives advised both the Port of Miami and Carnival Cruise Lines that they could go no further without a permit. Work stopped for a short period of time. In June 1995, a Representative from the Port of Miami called Chase Construction and told them to go to the Dade County Building and Zoning Department (Building Department) the next day to meet with Port of Miami officials, the architect, and building and zoning officials. Johns sent Dave Whelpley, who was a project manager and officer of Chase Construction. Palacios did not attend the meeting. Dr. Carlos Bonzon (Bonzon) was the director and building official of Dade County's Building Department during the majority of the construction activities at the Port of Miami by Chase Construction. As the building official, Dr. Bonzon gave verbal authorization for the work on the project to proceed above the foundation without a written permit. Inspections were to be done by the chief inspectors for Dade County. After the meeting with the Building Department officials in June 1995, Johns understood that authorization had been given by the building official to proceed with construction without a written permit. Work did proceed and inspections were made on the work completed. The Dade County Building Code Compliance Office (BBCO) had the responsibility to oversee Dade County's Building Department. In early 1996, an officer of the BBCO accompanied a building inspector during an inspection of the Port of Miami project. It came to the attention of the BBCO officer that no written permit had been issued for the project. The BBCO officer notified the chief of code compliance for Dade County. A written permit was issued for Phase II of the Port of Miami Project on February 6, 1996, at which time approximately 80 percent of the work had been completed. On the same date, Chase Construction issued a memorandum to its subcontractors to secure the necessary permits. Shortly after the permits were issued, an article appeared in the Miami Herald concerning the project and the lack of written permits. Respondent, Department of Business and Professional Regulation (Department) became aware of the situation as a result of the newspaper article and began an investigation. Diane Perera (Perera), an attorney employed by the Department since 1993 to prosecute construction-related professional license law violations, played a major role in determining and carrying out the Department's subsequent actions regarding the Port of Miami project and persons licensed by the Department who had been involved in the project. The Department opened investigations against eight Department licensees. Those licensees included two building officials, Bonzon, and Lee Martin; four contractors, Johns, Palacios, Douglas L. Orr, and D. Jack Maxwell; one engineer, Ramon Donnell; and one architect, Willy A. Bermello. By Administrative Complaint prepared by Perera and filed on September 9, 1997, before the Building Code Administrators and Inspectors Board (BCAIB), the Department charged Bonzon with various violations of Part XIII of Chapter 486, Florida Statutes, for having allowed above-grade construction on the project to proceed in the absence of approved plans and building permits. In conjunction with the Bonzon case, Charles Danger (Danger), a licensed professional engineer and Director of BBCO testified in a deposition that above-grade construction of the project had proceeded without a building permit and without approved plans in violation of Chapter 3, Section 301 of the South Florida Building Code. He also testified that Bonzon had exceeded his authority under the South Florida Building Code by authorizing the above-grade construction and that the contractors who performed the work did so in violation of the South Florida Building Code. The Department's charges against Bonzon were resolved through a settlement agreement, whereby Bonzon agreed to relinquish his building code administrator's license. A final order of the BCAIB accepting the settlement agreement was filed on July 2, 1998. In the settlement agreement, Bonzon specifically agreed that his interpretation of the South Florida Building Code provisions, including portions of Section 301, was erroneous. On June 24, 1998, the Department presented the Department's Case Number 97-17322 involving Johns to the Division I Probable Cause Panel (PCP) of the Construction Industry Licensing Board (CILB). The panel members on this date were Gene Simmons and Wayne Beigle. Stuart Wilson-Patton and Leland McCharen, assistant attorneys general, were present to provide legal advise to the PCP. The prosecuting attorney presenting the case to the panel was Perera. The Department was requesting a finding of probable cause against Johns for a violation of Section 489.129(1)(d), Florida Statutes, for knowingly violating the applicable building code by performing above-grade construction work on the Port of Miami project in the absence of approved plans and specifications. Prior to the meeting of the Division I PCP of the CILB, Perera had furnished the two panel members documentary evidence pertaining to the case, copies of which were received in evidence at the final hearing as Respondent's Exhibits 5 and 13, with the exception of a letter dated July 31, 1998, from Petitioners' attorney, Renee Alsobrook. Respondent's Exhibit 5 consisted of materials taken from the Bonzon and Lee Martin cases, including the transcript of the December 22, 1997, deposition of Charles Danger, who was the building officer for the BBCO from 1991 to 1998. Respondent's Exhibit 13 was the investigative file for the Johns' case. The Division I PCP discussed Johns' case and voted to request additional information regarding whether any fast track ordinance existed in Dade County, and if so, how it might have applied to the Port of Miami project. On June 24, 1998, the Division II PCP of the CILB met and discussed the Palacios case, which was designated as the Department's Case No. 97-17313. The members of the panel were James Barge and Richard Cowart. Mr. Wilson-Patton and Mr. McCharen were present to provide legal advise to the PCP. The prosecuting attorney presenting the case to the PCP was Perera. The Department was requesting a finding of probable cause against Palacios for violating Section 489.129(1)(d), Florida Statutes, by knowingly violating the applicable building code by performing above-grade construction work on the Port of Miami project in the absence of approved plans and a building permit. Prior to the Division II PCP meeting, the panel members were provided with materials which were received in evidence at the final hearing as Respondent's Exhibits 5 and 14, with the exception of letters dated July 31 and August 26, 1998, from Renee Alsobrook. Respondent's Exhibit 14 is the Department's investigative file on the Palacios case. Following a discussion of the Palacios case, one of the panel members made a motion not to find probable cause. The motion died for lack of a second, and the panel took no further action on the case that day. Pursuant to Section 455.225(4), Florida Statutes, the case was treated as one in which the PCP failed to make a determination regarding the existence of probable cause and was presented to Hank Osborne, Deputy Secretary of the Department, to make a determination whether probable cause existed. On July 2, 1998, Deputy Secretary Osborne found probable cause, and the Department filed an Administrative Complaint against Palacios, charging a violation of Section 489.129(1)(d), Florida Statutes. The Department never served Palacios with the Administrative Complaint filed on July 2, 1998. The Department did not notify Palacios that the Administrative Complaint had been filed and did not prosecute the Administrative Complaint. At the time the Administrative Complaint was filed, the Department believed that the Legislature was in the process of enacting legislation to repeal Section 489.129(1)(d), Florida Statutes. Chapter 98-419, Laws of Florida, which became law on June 17, 1998, repealed Section 489.129(1)(d), Florida Statutes, effective October 1, 1998. Because of the repeal and the lack of a savings clause for pending cases, the Department determined that as of October 1, 1998, the Department did not have authority to take disciplinary action based on a violation of Section 489.129(1)(d), Florida Statutes. On December 18, 1998, the Department presented the Department's Case Nos. 97-17133 and 97-1732 to the PCPs for a second time with a recommendation to find probable cause that Johns and Palacios had violated Section 489.129(1)(p), Florida Statutes, for proceeding on any job without obtaining applicable local building permits and inspections. Mr. McCharen was present to provide legal advice to the PCPs. Ms. Perera was also present during the meetings of the PCPs. Documentary materials presented to the PCP considering Palacios' case included the materials on the Bonzon and Martin cases which had been previously presented to the PCP panel in June 1998 and the investigative files on Palacios. The investigative file included letters with attachments from Palacios' attorney Rene Alsobrook concerning the materials contained in the Bonzon and Martin cases as they related to Palacios and the investigative file on Palacios. Additionally, the investigative file contained a report from Frank Abbott, a general contractor who had been asked by the Department to review the file on Palacios. Mr. Abbott concluded that Palacios had violated several provisions of Chapters 489 and 455, Florida Statutes, including Section 489.129(p), Florida Statutes. The PCPs found probable cause in the Johns and Palacios cases. On December 23, 1998, the Department filed administrative complaints against Palacios and Johns alleging violations of Section 489.129(1)(p), Florida Statutes. The cases were forwarded to the Division of Administrative Hearings for assignment to an administrative law judge. Palacios and Johns claimed that they were relying on the authorization from Bonzon when they proceeded on the above-grade construction work. No formal administrative hearing was held on the administrative complaints filed on December 23, 1998. On December 18, 1998, a Recommended Order was issued in the related case against Lee Martin, Department Case No. 97-11278, finding that Mr. Martin, the building official who replaced Bonzon and assumed responsibility for the Port of Miami project, had the discretion to allow the remaining construction to proceed while taking action to expedite the plans processsing. A Final Order was entered by the Department dismissing all charges against Mr. Martin. On February 26, 1999, Petitioners Palacios' and Johns' Motions to Dismiss and Respondent's responses were filed. The Motions to Dismiss did not request attorney's fees or costs and did not reference Section 120.595(1), Florida Statutes. The motions did contain the following language: The DBPR has acted in an improper and malicious manner by precluding the Respondent from asserting his response to the second draft Administrative Complaint and requesting the Panel to find probable cause for reasons other than whether there was probable cause to believe the Respondent violated specific disciplinary violations. On March 19, 1999, the cases were consolidated and noticed for hearing on May 12-13, 1999. Section 489.129, Florida Statutes, was amended during the 1999 legislative session to provide: A contractor does not commit a violation of this subsection when the contractor relies on a building code interpretation rendered by a building official or person authorized by s. 553.80 to enforce the building code, absent a finding of fraud or deceit in the practice of contracting, or gross negligence, repeated negligence, or negligence resulting in a significant danger to life or property on the part of the building official, in a proceeding under chapter 120. . . . On April 15, 1999, the Department filed a Motion for Leave to Revisit Probable Cause Panel and to Hold in Abeyance. On April 20, 1999, Petitioners filed a response, stating they did not object to the granting of the motion to hold in abeyance. The final hearing was cancelled, and the cases were placed in abeyance. On May 24, 1999, the Department submitted a Status Report, stating that the cases would be placed on the next regularly scheduled PCP meeting scheduled for June 16, 1999. By order dated May 25, 1999, the cases were continued in abeyance. On July 1, 1999, Palacios and Johns filed a Status Report, indicating that the cases would be presented to the PCPs sometime in July and requesting the cases be continued in abeyance for an additional 30 days in order for the parties to resolve the issues. On July 30, 1999, Palacios and Johns filed a Status Report, stating that the cases were orally dismissed on July 28, 1999, and that a hearing involving issues of disputed facts was no longer required. Based on Johns' and Palacios' status report, the files of the Division of Administrative Hearings were closed by order dated August 3, 1999. No motion for attorney's fees and costs was filed during the pendency of the cases at the Division of Administrative Hearings. On August 3, 1999, orders were entered by Cathleen E. O'Dowd, Lead Attorney, dismissing the cases against Palacios and Johns.

Florida Laws (9) 120.569120.57120.595120.68455.225489.129553.8057.10557.111
# 2
DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION, BOARD OF BUILDING CODE ADMINISTRATORS AND INSPECTORS vs MORRIS TESH, 10-002883PL (2010)
Division of Administrative Hearings, Florida Filed:Bunnell, Florida May 26, 2010 Number: 10-002883PL Latest Update: Mar. 31, 2011

The Issue The issue to be determined is whether Respondent violated Section 468.621(1)(g), Florida Statutes, as alleged in the Administrative Complaint, and if so, what penalty should be imposed?

Findings Of Fact Petitioner is the state agency charged with the licensing and regulation of building code administrators and inspectors in the State of Florida, pursuant to Section 20.165 and Chapters 455 and 468, Part XII, Florida Statutes. Respondent is a certified standard building inspector in the State of Florida, having been issued license number BN 3816. He held this license at all times relevant to this complaint. Respondent provides building inspections as a private provider within the City of Jacksonville. In the course of his duties as a building inspector, Respondent has inspected structures at the following locations in Jacksonville: 1142 Johnson Creek Circle; 8242 Maple Street; 9127 5th Avenue; 7053 Civic Club Drive; 11658 Pleasant Creek Drive; and 2700 Jane Street. The City of Jacksonville Quality Assurance Office (QA Office) in the Building Department conducted audits of the inspections provided by Respondent at the above-named locations. The QA Office determined that there were deficiencies concerning the inspections for the six structures, and prepared an "Audit Report" with respect to each structure. However, Audit Reports are only prepared where the QA Office perceives a pattern of violations, presumably for a particular private provider. Audit Reports are not prepared with respect to every audit performed. The Audit Report for the 11442 Johnson Creek Circle address listed 22 "deficiencies." Joshua Gideon, a construction trades inspector for the City of Tallahassee, testified that the "deficiencies" ranged from building code violations to missed items that that were required by the engineer. He testified that, as a whole, the deficiencies could not be considered minor, and that some individual items would not be considered minor standing alone. However, no evidence was presented to identify which alleged deficiencies represented code violations, which deficiencies were considered "major," or to identify exactly what code provisions were at issue. In addition, Mr. Gideon testified that the majority of items that were listed were items required by the engineer of record. No evidence was presented to explain whether items required by the engineer of record would also be building code violations. The Audit Report for the inspection at 8242 Maple Street indicates there were seven deficiencies. It does not, however, indicate what the building code required or how those requirements were not met. Further, Mr. Gideon did not physically inspect this property and no inspector that visited the site actually testified. While Mr. Gideon assisted in preparing the report, his assistance would be based on what was reported to him, and both his testimony and the contents of the report are uncorroborated hearsay. Like the job at 8242 Maple Street, Mr. Gideon did not visit the actual property at 9127 Fifth Avenue, but simply assisted in preparing the report. Although it is alleged that the permit and plans were not posted on site, so that it would not be possible to post inspections on the permit card, no one who visited the site testified at hearing. Mr. Gideon also did not perform the audit of the job located at 7053 Civic Club. Although the Audit Report indicates that there were 18 deficiencies, there is no indication which of these deficiencies represented building code violations and which were variations from the plans. Further, no one who actually visited the site testified at hearing. Mr. Gideon did visit the job at 11658 Pleasant Creek Drive. The Audit report that he prepared indicated that there were 19 deficiencies. He testified at hearing that deficiencies were items that were required by the engineer of record. No evidence was presented, however, to identify a deficiency that was a violation of building code standards or, in the event of such a deficiency, what provision in the building code was at issue. The final property at issue is a property located at 2700 Jane Street. This structure, which Mr. Gideon visited, is a multi-story wood-framed hotel. Several deficiencies were noted with respect to this building, including fire assemblies not constructed according to their tested assemblies, incorrect insulation installed, incorrect channeling in the ceiling, and multiple cut or broken floor truss joists. However, as with the other properties, no evidence was presented to indicate which deficiencies were items required by the engineer of record, and which deficiencies actually represented violations of the building code. In addition, it was stated at hearing that there were multiple framing inspections of this property because of its size. However, there is no testimony that provides the sequence of events related to the alleged deficiencies. In other words, while there is an attachment to the Audit Report indicating the times of different inspections, there was no evidence presented that indicated what was wrong each time Respondent inspected the property, and what he should have but did not flag as not meeting building code requirements.

Recommendation Upon consideration of the facts found and conclusions of law reached, it is RECOMMENDED that the Florida Building Code Administrators and Inspectors Board enter a Final Order dismissing the Administrative Complaint in its entirety. DONE AND ENTERED this 8th day of December, 2010, in Tallahassee, Leon County, Florida. S LISA SHEARER NELSON Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 8th day of December, 2010. COPIES FURNISHED: Elizabeth F. Duffy, Esquire Department of Business and Professional Regulation 1940 North Monroe Street, Suite 42 Tallahassee, Florida 32399-2202 Morris Tesh Post Office Box 721 Bunnell, Florida 32110 Robyn Barineau, Executive Director Building Code Administrators and Inspectors Board Department of Business and Professional Regulation 1940 North Monroe Street Tallahassee, Florida 32399-2202 Reginald Dixon, General Counsel Department of Business and Professional Regulation 1940 North Monroe Street Tallahassee, Florida 32399-2202

Florida Laws (7) 120.569120.57120.6820.165468.62190.80390.902
# 4
HAROLD N. HERMAN vs. COUNTY OF PASCO, 84-003554 (1984)
Division of Administrative Hearings, Florida Number: 84-003554 Latest Update: Nov. 15, 1990

Findings Of Fact Harold E. Herman was terminated from his job as General Building Inspector with Pasco County in 1983. At the time of his dismissal he was 58 years old. Herman had worked as a Building Inspector in the Pasco County Building Inspection Department for approximately ten years. He was Chief Building Inspector until his demotion to General Inspector in 1982. Joseph T. Rachel was terminated from his job as General Building Inspector with Pasco County at the same time or about the same time Herman was dismissed. Both Herman and Rachel had been hired by the Pasco County Building Department at the same time (Exhibit 2). At the time of his termination Rachel was 61 years old and in good health. No evidence was presented that either Petitioner was physically unable to adequately carry out the duties of a building inspector. Both Herman and Rachel were combined inspectors deemed qualified to inspect construction and mechanical on residential construction. On commercial construction combined inspectors are not used and each inspector inspects only the construction aspect for which he is primarily qualified such as plumbing, electrical, construction, etc. At or about the same time these Petitioners were dismissed another inspector, Connell, was also terminated. Connell was 36 years old at the time of his dismissal (Exhibit 2). Subsequent to the dismissal of these two Petitioners seven people have been hired by the Pasco County Building Department ranging in age at the time of hiring from 47 to 63 years old (Exhibit 1). Only one employee in this department is less than 40 years old and the average age of Pasco County Building Inspectors is in the mid-50's. In the summer of 1983 the manager of the Dade City building office received complaints from owners of recently built homes in a subdivision known as Southlake near Land O'Lakes. Twenty-one of these houses were subsequently reinspected by a different inspector in the building department and code violations were found on 17 of the homes inspected. The violations ranged from improperly installed tie-downs to removal of strength members in framing and trusses. Seven of the homes in which code violations were found were inspected by Rachel and two were inspected by Herman. Others presumably were inspected by Connell, who was fired as the result of this same investigation. Petitioners attempted to show that the persons conducting the investigations of code violations were not competent building inspectors and that code violations were overlooked on other homes. This evidence is not relevant to these proceedings as it is not related to Petitioners' ages.

Florida Laws (1) 760.10
# 5
CONSTRUCTION INDUSTRY LICENSING BOARD vs. FRANCIS M. LINER, 87-000159 (1987)
Division of Administrative Hearings, Florida Number: 87-000159 Latest Update: Mar. 24, 1987

The Issue Whether respondent committed the acts alleged in the administrative complaint, and, if so, whether respondent's license should be revoked, suspended or otherwise disciplined pursuant to Section 489.129, Florida Statutes.

Findings Of Fact Respondent is, and was at all times relevant to the administrative complaint, a certified building contractor in the State of Florida, having been issued license number CB C011812. Respondent is and was at all relevant times a registered building contractor in the State of Florida having been issued license number RB 0006305. At all times material to the administrative complaint respondent's certified building contractor license (CB 0011812) qualified "Metal Products of Tampa, Inc." with the Florida Construction Industry Licensing Board. Section 111.1 of the Hillsborough County Building Code, Ordinance No. 86-6, adopted February 13, 1986, (henceforth Code) established the Building Board of Adjustment, Appeals and Examiners (henceforth Board). The Board is given authority to hear charges of violations of the provisions of the Code against any building contractor and to impose the disciplinary actions listed in Section 111.7 on any contractor found by the Board to have violated any provisions of the Code. Section 111.4, Hillsborough County Building Code. Section 111.5 of the Code sets forth the grounds for disciplinary action by the Board. Section 111.6 provides that a written notice of hearing shall be provided to the contractor alleged to have committed one or more of the grounds for disciplinary action. The notice includes the grounds alleged and the time, date, and place of hearing. After the hearing, if the Board finds that disciplinary action is justified, it may suspend the contractor from all operations as a contractor for a period not to exceed five years, it may revoke the contractor's certificate of competency, or it may limit the number of permits a contractor may be issued. The code also provides that after revocation, the Board shall reinstate a certificate of competency on proof of compliance with the provisions of the Code. Section 111.7, Hillsborough County Building Code. The decision of the Board is reduced to writing, but the order of the Board takes effect immediately upon the vote of the Board, unless an extension of time is granted. The violator may petition the Board for rehearing within ten days after the entry of the order. If a petition for rehearing is denied, the violator shall have the right, within thirty days after entry of the order, to appeal to the Board of County Commissioners. If no petition for rehearing has been taken, the violator may take an appeal within thirty days from the entry of the initial decision. On September 30, 1986, a hearing before the Board was held on the charges brought against the respondent. The respondent was provided with a copy of all charges against him. The following is a summary of the events which led up to the charges brought against respondent by the Building Department, as set forth by the Board staff in the charging documents: A. On November 9, 1984, Mr. Charles Russell contracted with Mr. Ansel Thompson, doing business as Jackson Heights Blue Prints, to add a Florida room, bathroom, carport, utility room, front entry, and roof addition.... The building permit was purchased for the addition by Mr. Liner. Mr. Ansel Thompson is unlicensed in Hillsborough County. There is no record of a Certificate of Occupancy issued by the Building Department. A red-tag violation by the Plumbing Section of the Building Department is outstanding at this time. Mr. Thompson has been paid $17,200 for the project. B. On October 3, 1984, Mr. and Mrs. William Madden contracted with Liner Construction to build an addition to their residence... Liner Construction has received $11,645 payment from the Maddens. A red-tag violation was issued by the Building Department for a leak- ing roof. No certificate of occupancy was issued on this project. C. On March 4, 1965, Mr. Barry Dingman contract- ed with Liner Construction to install a screen room/pool enclosure at his residence. Mr. Liner purchased the permit for project; no inspections are on record and no certifi- cate of occupancy has been issued by the Building Department. D. Mrs. Ann Katschka contracted with Liner Construction on October 16, 1984, for a screen room enclosure. Mr. Liner purchased the building permit; there is no record of inspections or a certificate of occupancy issued by the Building Department on this project. Mrs. Katschka complains that rain continues to leak into screen room. E. On March 27, 1985, Mr. C. G. Meyer contract- ed with Liner Construction for a screen room addition. Mr. Liner purchased the building permit for the project; no inspections or cer- tificate of occupancy are on record at the Building Department. F. On March 16, 1984, Mr. and Mrs. Mallory contracted with Liner Construction to build a screen room addition ... Mr. Liner purchased the building permit; no inspections or certificate of occupancy are on record at the Building Department. G. In December, 1984, Mr. Larry Schoenberger contracted with Liner Construction for a screen room addition ...Mr. Liner purchased the building permit for the project; no inspections or certificate of occupancy are on record at the Building Department. H. On September 30, 1986, Mr. Moyer contracted with Liner Construction for a residential addition/garage. .Mr. Liner has received approximately $25,000 payment for the project. Mr. Liner, however, did not pay his subcontractors, causing them to file Notices to Owner of intent to file liens. Mr. Moyer personally paid Edward Connor $1,200 for labor on roofing and framing services, and Crane & Crane Electric $1,008 for wiring and fixtures to avoid Claims of Lien. Mr. Liner still has not paid Florida Garage $913 owed and Cox Lumber Company approximately $7,000 owed. Mr. Liner has filed a Claim of Lien against the Moyers for $9,006. Building and electrical inspections were completed and finaled; however, the roofing permit was never purchased, resulting in the project remaining unfinaled by the Building Department. Based on the foregoing allegations, respondent was charged with several violations of the Code, including (a) aiding or abetting an uncertified person to evade any provision of the Code; (b) willful or deliberate disregard of applicable building codes; (c) failure to comply with the provisions of the Code; (d) violations of Chapter 489, Florida Statutes; (e) abandonment of construction projects; and, (f) in the Russell case, fraud, deceit, gross negligence, incompetency, or misconduct in the practice of contracting. The charges of failure to comply with the Code were based on respondent's failure to display the state registration or certification number on written contracts, his failure to call for required inspections, and his failure to obtain certificates of occupancy. The violation of Chapter 489 that was alleged, that did not duplicate Code violations, was failure to inform the department of an affiliation with a different business in violation of 489.119, Florida Statutes. Respondent was present at the hearing on the charges held before the Board on September 30, 1986. He advised the Board that, as to the Russell case, he had planned to go into business with Mr. Thompson but changed his mind. Respondent stated that the problems which were the subject of Mr. Russell's complaints had been corrected. Respondent also advised the Board that he had taken steps to correct the other problems complained of and that he was now supervising all the construction projects personally. After considering the documentary evidence presented and hearing from respondent and Mr. Madden, the Board voted 6-0 to revoke respondent's State of Florida permitting privileges in Hillsborough County and respondent's Hillsborough County license. Respondent was advised that he could appeal the decision. By written order entered September 30, 1966, and received by respondent on October 15, 1986, the Board found that respondent admitted the truth of all allegations against him and ordered that respondent's Hillsborough County license and his State of Florida permitting privileges in Hillsborough County be revoked. As of the date of the hearing the respondent had not appealed the order of the Board, and the time for taking an appeal had expired. On August 16, 1985, Mrs. Sweeney entered into a contract with a company doing business as Liner Construction. The contract was for a screen enclosure around a swimming pool. Construction was started on the enclosure the following week. On August 29, 1985, after construction was begun on the enclosure, a building permit was obtained from the City of Tampa to erect the pool enclosure. Respondent applied for the permit only after he had received a Notice of Violation from the city. Respondent had to pay a double fee because he did not timely apply for the permit. The only inspection required for a screened enclosure is a final inspection; there are no interim inspections. However, due to a dispute over payments that were to be made by the Sweeneys, respondent did not complete the construction of the enclosure and, therefore, did not call for the final inspection. Section 45-1 of the City of Tampa Code adopts the Standard Building Code promulgated by the Southern Building Code Congress International, Inc. Section 105.1(a) of the Standard Building Code provides as follows: Any ... contractor who desires to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure ... shall first make application to the Building Official and obtain the required permit therefore. Section 106.1(a) provides as follows: A person, firm or corporation shall not erect, construct, enlarge, alter, repair, move, improve, remove, convert or demolish any building or structure in the applicable jurisdiction... without first obtaining a separate building permit for such building or structure from the Building Official. The respondent has taken steps to correct the problems involved in the cases brought before the Hillsborough County Board. At the time of the hearing, respondent had called for final inspections on all the projects; however, the final inspections had not been performed on all of the projects. Respondent was previously disciplined by the Construction Industry Licensing Board in 1979.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that the Construction Industry Licensing Board enter a final order finding respondent guilty of those acts set forth in subsections 489.129(1)(d) and (i), Florida Statutes, as alleged in the administrative complaint, finding respondent not guilty of the acts set forth in Section 489.129(1)(m), Florida Statutes, suspending respondent's license for a period of one year, with the provision that at any time after two months from the date of entry of the final order, the suspension of respondent's license shall be stayed upon proof by respondent that his Hillsborough County license has been reinstated. DONE and ORDERED this 6th day of May, 1987, in Tallahassee, Florida. DIANE A. GRUBBS Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 6th day of May, 1987. COPIES FURNISHED: W. Douglas Beason, Esquire Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32399-0750 Francis M. Liner Post Office Box 2016 Lutz, Florida 33549 Joseph A. Sole, Esquire General Counsel Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32399-0750 Fred Seely, Executive Director DPR, Construction Industry Licensing Board Post Office Box 2 Jacksonville, Florida 32201 Robert A. Mora, Esquire Barnett Plaza, Suite 1870 101 East Kennedy Blvd. Tampa, Florida 33602-5133

Florida Laws (3) 120.57489.119489.129
# 6
DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION vs CAYETANO F. ALFONSO, 04-004363PL (2004)
Division of Administrative Hearings, Florida Filed:Miami, Florida Dec. 09, 2004 Number: 04-004363PL Latest Update: May 02, 2005

The Issue Whether Respondent, who is licensed as a Plans Examiner, a Building Inspector, and a Building Code Administrator, committed the offenses alleged in the three-count Administrative Complaint and, if so, the penalties if any that should be imposed.

Findings Of Fact Petitioner is the agency of the State of Florida with the responsibility to regulate Building Code Administrators and Inspectors pursuant to Section 20.165, Chapter 455, and Part XII of Chapter 468, Florida Statutes. At all times relevant to this proceeding, Respondent held licenses as a Standard Plans Examiner in Building and Mechanical; a Standard Inspector in Building and Mechanical; and a Building Code Administrator. Section 468.603(1), Florida Statutes, provides the following definitions relevant to this proceeding: Building code administrator" or "building official" means any of those employees of municipal or county governments with building construction regulation responsibilities who are charged with the responsibility for direct regulatory administration or supervision of plan review, enforcement, or inspection of building construction, erection, repair, addition, remodeling, demolition, or alteration projects that require permitting indicating compliance with building, plumbing, mechanical, electrical, gas, fire prevention, energy, accessibility, and other construction codes as required by state law or municipal or county ordinance. This term is synonymous with "building official" as used in the administrative chapter of the Standard Building Code and the South Florida Building Code. . . . Section 468.603(2), Florida Statutes, provides the following definition relevant to this proceeding: (2) "Building code inspector" means any of those employees of local governments or state agencies with building construction regulation responsibilities who themselves conduct inspections of building construction, erection, repair, addition, or alteration projects that require permitting indicating compliance with building, plumbing, mechanical, electrical, gas, fire prevention, energy, accessibility, and other construction codes as required by state law or municipal or county ordinance. Section 468.603(6), Florida Statutes, provides the following definitions relevant to this proceeding: "Categories of building code inspectors" include the following: "Building inspector" means a person who is qualified to inspect and determine that buildings and structures are constructed in accordance with the provisions of the governing building codes and state accessibility laws. * * * (e) "Mechanical inspector" means a person who is qualified to inspect and determine that the mechanical installations and systems for buildings and structures are in compliance with the provisions of the governing mechanical code. Section 468.603(7), Florida Statutes, provides the following definitions relevant to this proceeding: "Plans examiner" means a person who is qualified to determine that plans submitted for purposes of obtaining building and other permits comply with the applicable building, plumbing, mechanical, electrical, gas, fire prevention, energy, accessibility, and other applicable construction codes. Categories of plans examiners include: (a) Building plans examiner. * * * (c) Mechanical plans examiner. Section 468.603(7), Florida Statutes, provides the following definitions relevant to this proceeding: "Building code enforcement official" or "enforcement official" means a licensed building code administrator, building code inspector, or plans examiner. Ramon Melendez, doing business as R.E.M. Roofing, Inc., was not licensed as a construction contractor in Florida at any time relevant to this proceeding. Mr. Melendez was not individually licensed as a construction contractor in Florida at any time relevant to this proceeding. R.E.M. Roofing, Inc., was not qualified as a construction business by any certified or registered contractor in Florida at any time relevant to this proceeding. On or about March 20, 1998, Mr. Melendez, doing business as R.E.M. Roofing, Inc., contracted with Pedro Camacho to re-roof the residence located at 3961 N.W. 170th Street, Miami, Florida, for the sum of $3,000. Mr. Camacho paid Mr. Melendez the agreed sum in cash based on the contract dated March 20, 1998. On or about June 3, 1998, Mr. Melendez, doing business as R.E.M. Roofing, Inc., contracted with Santos Valentin to re- roof the residence located at 4412 N.W. 185th Street, Opa Locka, Florida, for the sum of $2,800. Mr. Valentin paid R.E.M. Roofing, Inc. the sum of $1,400 on June 8, 1998. Mr. Valentin paid Mr. Melendez the additional sum of $800 on June 10, 1998. Both payments, which were by check, were for the roofing work described in the contract dated June 3, 1998. On April 6, 1998, Respondent applied for and obtained a permit for the Camacho roofing work. This permit application was submitted to the Metropolitan Dade County Department of Planning Development and Regulation. Respondent signed the permit application as “the contractor” and inserted his contractor license number and social security number on the application. The application submitted by Respondent on April 6, 1998, was a fraudulent sham. At no time was Respondent the contractor for the Camacho roofing work. Respondent’s action in obtaining the building permit aided and abetted an unlicensed contractor to engage in contracting. On June 8, 1998, Respondent applied for and obtained a permit for the Valentin roofing work. This permit application was submitted to the Metropolitan Dade County Department of Planning Development and Regulation. Respondent signed the permit application as “the contractor” and inserted his contractor license number and social security number on the application. The application submitted by Respondent on June 8, 1998, was a fraudulent sham. At no time was Respondent the contractor for the Valentin roofing work. Respondent’s action in obtaining the building permit aided and abetted an unlicensed contractor to engage in contracting. Miami-Dade County Compliance Investigator Daniel Vuelta filed criminal charges against Respondent in two separate criminal cases. One case was for his involvement in the Camacho roofing project and the other was for his involvement in the Valentin roofing projects. These cases were brought in Miami- Dade County Court and assigned case numbers M99-57926 and M99- 57931. In each case, Respondent was charged with one count of Unlawful Application for Building Permit and one count of Aiding and Abetting an Unlicensed Contractor. All charges were first- degree misdemeanors. On February 22, 2001, Respondent entered into a plea agreement to resolve those criminal charges. Respondent entered a plea of guilty to each of the two counts in Case M99-57931, and he was subsequently adjudicated guilty of each count. As part of the plea agreement, the State agreed to nolle pross Case M99-57926. The crimes to which Respondent entered a guilty plea involved fraudulent building permits and, consequently, were directly related to building code enforcement. Petitioner’s investigative costs for this case, excluding costs associated with any attorney’s time, were $427.29.

Recommendation Based on the foregoing findings of fact and conclusions of Law, it is RECOMMENDED that Petitioner enter a final order finding Respondent guilty of the offenses alleged in Counts I, II, and III. It is further RECOMMENDED that the final order revoke Respondent’s licensure and impose an administrative fine against him in the amount of $3,000. It is further RECOMMENDED that Petitioner order Respondent to pay its investigative costs, excluding costs associated with any attorney’s time, in the amount of $427.29. DONE AND ENTERED this 7th day of April, 2005, in Tallahassee, Leon County, Florida. S CLAUDE B. ARRINGTON Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 7th day of April, 2005.

Florida Laws (6) 120.5720.165455.227468.221468.603468.621
# 8
CONSTRUCTION INDUSTRY LICENSING BOARD vs. JACK KAYLAN LITTLE, 82-001346 (1982)
Division of Administrative Hearings, Florida Number: 82-001346 Latest Update: Jun. 07, 1983

Findings Of Fact Based upon all the evidence and the observed candor and demeanor of the witnesses, the following are found as facts: The Respondent, Jack Kaylan Little, is a certified building contractor, having been issued license number CB C012829. During the time period relevant to this proceeding, the Respondent was the qualifier for A & J Builders, Inc. In 1979 Jack Little, Sr., the Respondent's father, was doing business as Little Jack Homes, Inc., in Orange County, Florida, and he was the qualifier for Little Jack Homes, Inc. On March 26, 1979, Jack Little, Sr., entered into a contract with Thomas and Joyce Leach to construct a residence for them in Osceola County, Florida, for the sum of $39,000. Neither Jack Little, Sr., the Respondent's father, nor Little Jack Homes, Inc., the father's company, were properly licensed to perform construction in Osceola County. Jack Little, Sr., subcontracted the construction of the Leach residence in Osceola County to the Respondent, because the Respondent was licensed there and his father was not. The Respondent was aware that his father was not licensed outside of Orange County, and they agreed that the Respondent would obtain the building permits needed to perform construction whenever the father obtained contracts for construction outside of Orange County. The Respondent agreed to perform the construction of the Leach residence pursuant to the agreement between himself and his father. On May 30, 1979, the Respondent obtained Osceola County building permit number 1102-79(b) to perform the construction of the Leach residence. The Respondent actually performed the construction of the Leach residence using the business entity A & J Builders, Inc., which he qualified during this time period, and which he continues to qualify. At no time relevant to the construction of the Leach residence by the Respondent for his father was the Respondent an officer, director or stockholder of his father's company, nor did the Respondent have any active participation in the operations, management or control of his father's company. Other occasions when the Respondent performed a similar function for his father were alluded to, but insufficient evidence was presented to support a finding of fact that there was more than a single occurrence of this nature.

Recommendation From the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Respondent, Jack Kaylan Little, be found guilty of one violation of Section 489.129(1)(e) Florida Statutes, one violation of Section 489.129(1)(f), one violation of Section 489.129(1)(g), and one violation of Section 489.129(1)(j), Florida Statutes, and that there be imposed on him an administrative fine of $250.00 for each of the four violations, totaling $1,000. THIS RECOMMENDED ORDER entered on this 20th day of January, 1983, in Tallahassee, Florida. WILLIAM B. THOMAS, Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 20th day of January, 1983. COPIES FURNISHED: John O. Williams, Esquire Suite 204 547 North Monroe Street Tallahassee, Florida 32301 Jack R. Leonard, Esquire Suite 103 800 North Highland Avenue Orlando, Florida 32803 Fred Roche, Secretary Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 James Linnan, Executive Director Construction Industry Licensing Board Department of Professional Regulation Post Office Box 2 Jacksonville, Florida 32202 ================================================================= AGENCY FINAL ORDER ================================================================= STATE OF FLORIDA DEPARTMENT OF PROFESSIONAL REGULATION CONSTRUCTION INDUSTRY LICENSING DEPARTMENT OF PROFESSIONAL REGULATION, Petitioner. vs. DOAH CASE NO. 82-1346 JACK KAYLAN LITTLE A & J Builders, Inc. 6522 La Jolla Street Orlando, Florida 32808 /

Florida Laws (3) 120.57489.119489.129
# 9
CONSTRUCTION INDUSTRY LICENSING BOARD vs MARVIN M. KAY, 89-003902 (1989)
Division of Administrative Hearings, Florida Filed:Fort Lauderdale, Florida Jul. 21, 1989 Number: 89-003902 Latest Update: Mar. 12, 1993

The Issue DOAH Case No. 89-3902, the Barona and Carrow Complaints Whether Respondent violated Florida Statutes Section 489.129(1)(d), by willfully or deliberately disregarding and violating the applicable building codes or laws of the state or of any municipalities or counties thereof. Whether Respondent violated Florida Statutes Section 489.129(1)(m), by being guilty of fraud or deceit or of gross negligence, incompetency, or misconduct in the practice of contracting. DOAH Case No. 90-1900, the Grantz, Victor, Beckett, Maffetonne, and Wolfe Complaints Whether Respondent violated Sections 489.129(1)(m), (j), and 489.105(4), and 489.119, Florida Statutes, by being guilty of gross negligence, incompetence, and/or misconduct. Whether Respondent violated Sections 489.129(1)(h), (m), (j), and 489.119, and 489.105(4), Florida Statutes, by being guilty of financial mismanagement or misconduct. Whether Respondent violated Section 489.129(1)(d), Florida Statutes, by wilful or deliberate violation or disregard of applicable local building codes and laws. Whether Respondent violated Sections 489.129(1)(m), (j), 489.119, and 489.105(4), Florida Statutes, by failing to properly supervise contracting activities he was responsible for as qualifying agent, which supervisory deficiency also reflected gross negligence, incompetence, or misconduct Whether Respondent violated Section 489.129(1)(k), Florida Statutes, by abandoning a construction project in which the contractor is engaged or under contract as a contractor. Whether Respondent violated Sections 489.129(1)(m), and (j), Florida Statutes, by giving a guarantee on a job to a consumer and thereafter failing to reasonably honor said guarantee in violation of Florida Statutes. DOAH Case No. 90-1901, the Klokow Complaint Whether Respondent violated Section 489.129(1)(d), Florida Statutes, by wilfully or deliberately disregarding and violating the applicable building codes or laws of the state or any municipalities or counties thereof. Whether Respondent violated Section 489.129(1)(k), Florida Statutes, by abandoning a construction project in which the contractor is engaged or under contract as a contractor. Whether Respondent violated Section 489.129(1)(m), Florida Statutes, by being guilty of fraud or of gross negligence, incompetency, or misconduct in the practice of contracting. DOAH Case No. 90-1902, the Meister Complaint Whether the Respondent violated Section 489.129(1)(n), Florida Statutes, by failure to obtain a permit. DOAH Case No. 91-7493, the Antonelli Complaint Whether Respondent violated Section 489.129(1)(h), Florida Statutes, by committing mismanagement or misconduct in the practice of contracting that causes financial harm to a customer. Whether Respondent violated Section 489.129(1)(k), Florida Statutes, by abandoning a construction project in which the contractor is engaged or under contract as a contractor. Whether Respondent violated Section 489.129(1)(m), Florida Statutes, by being guilty of fraud or deceit or of gross negligence, incompetency, or misconduct in the practice of contracting. DOAH Case No. 91-7951, the Insurance, Palomba, Romanello and Marin Complaints The Insurance Complaint Whether Respondent violated Section 489.129(1)(c), Florida Statutes, by violating Section 455.227(1)(a), Florida Statutes, by making misleading, deceptive, untrue, or fraudulent representations in the practice of his profession. Whether Respondent violated Section 489.129(1)(d), Florida Statutes, by wilfully or deliberately disregarding and violating the applicable building codes or laws of the state or any municipalities or counties thereof. Whether Respondent violated Section 489.129(1)(c), Florida Statutes, by violating Section 455.227(1)(b), Florida Statutes, by intentionally violating a Board rule. Whether Respondent violated Section 489.129(1)(m), Florida Statutes, by being found guilty of fraud or deceit or of gross negligence, incompetency, or misconduct in the practice of contracting. The Palomba Complaint Whether Respondent violated Section 489.129(1)(h), Florida Statutes, by committing mismanagement or misconduct in the practice of contracting that causes financial harm to a customer. Whether Respondent violated Section 489.129(1)(m), Florida Statutes, by being found guilty of fraud or deceit or of gross negligence, incompetency, or misconduct in the practice of contracting. The Romanello Complaint Whether Respondent violated Section 489.129(1)(h), Florida Statutes, by committing mismanagement or misconduct in the practice of contracting that causes financial harm to a customer. Whether Respondent violated Section 489.129(1)(k), Florida Statutes, by abandoning a construction project in which the contractor is engaged or under contract as a contractor. Whether Respondent violated Section 489.129(1)(m), Florida Statutes, by being found guilty of fraud or deceit or of gross negligence, incompetency, or misconduct in the practice of contracting. The Marin Complaint Whether Respondent violated Section 489.129(1)(h), Florida Statutes, by committing mismanagement or misconduct in the practice of contracting that causes financial harm to a customer. Whether Respondent violated Section 489.129(1)(k), Florida Statutes, by abandoning a construction project in which the contractor is engaged or under contract as a contractor. Whether Respondent violated Section 489.129(1)(m), Florida Statutes, by being found guilty of fraud or deceit or of gross negligence, incompetency, or misconduct in the practice of contracting. DOAH Case No. 92-0370, the Pappadoulis Complaint Whether Respondent violated Section 489.129(1)(h), Florida Statutes, by committing financial misconduct. Whether Respondent violated Section 489.129(1)(m), Florida Statutes, by committing gross negligence, incompetence and misconduct in the practice of contracting.

Findings Of Fact Pre-Hearing Admissions 3/ Admissions Applicable to All Cases Respondent is currently licensed as a contractor by the Florida Construction Industry Licensing Board. Respondent's current license number from the Florida Construction Industry Licensing Board is CG C040139. Respondent is licensed by the Florida Construction Industry Licensing Board as a certified general contractor. Respondent holds Florida Certified Roofing License No. CC-042792. Respondent is the qualifying agent for Tropical Home Industries, Inc. As qualifying agent for Tropical Home Industries, Inc., Respondent is responsible for all work performed. DOAH Case No. 89-3902 Respondent was licensed as set forth in items 1, 2, 3 and 4 above at the time of the job alleged in the Administrative Complaint. Exhibit "A", attached to the Request for Admissions 4/ is a true and correct copy of the contract between Sarah S. Carrow and the firm Respondent qualified at the time the contract was executed. As a qualifier for Tropical Home Industries, Inc., Respondent was responsible in his capacity as a certified general and roofing contractor for all work performed by Tropical Home Industries, Inc., pursuant to its contract with Sarah S. Carrow. Pursuant to the contract between Sarah S. Carrow and Tropical Home Industries, Inc., all work under said contract was to be completed in three (3) to six (6) weeks. Respondent, acting through Tropical Home Industries, Inc., failed to complete all work under the contract with Sarah S. Carrow within six (6) weeks after work was commenced. Respondent, acting through Tropical Home Industries, Inc., failed to obtain a final inspection of the work under the contract with Sarah S. Carrow prior to the building permit's expiration date. Broward County, Florida, has adopted the South Florida Building Code as its local ordinance governing residential construction. Respondent's failure to obtain a timely final inspection of the work performed pursuant to the contract between Tropical Home Industries, Inc., and Sarah S. Carrow is a violation of Section 305.2 of the South Florida Building Code. Section 1405.1 of the South Florida Building Code requires installation of either a window or vent fan in each bathroom. Section 3407.9(a) of the South Florida Building Code requires that flashing be installed on plumbing vent pipes which are installed through the roof. Any problems or deficiencies in the work performed by Tropical Home Industries, Inc., pursuant to its contract with Sarah S. Carrow were caused by employees and/or subcontractors of Tropical Home Industries, Inc. DOAH Case Nos. 89-3902, 90-1900, 90-1901, and 90-1902 DOAH Case No. 89-3902 The Baronas' house is located at 1251 Westchester Drive East, West Palm Beach, Florida 33417. Respondent contracted with the Baronas as the qualifying agent of Tropical Home Industries, Inc. The Baronas' house is located within Palm Beach County. Palm Beach County is the appropriate Building Department under which all inspections were to have been performed. DOAH Case No. 90-1901 On or about December 5, 1988, Respondent contracted with Mel Klokow, acting for Linda Klokow ("Klokow"), for the renovation of a screen porch with a roof to her home. Respondent contracted with Klokow as a qualifying agent of Tropical Home Industries, Inc. Permit No. 88-8085 was issued by the local building department. The work at the Klokow residence did not pass final inspection. DOAH Case No. 90-1902 In December of 1987, Respondent contracted to close in a screen porch for Janet Meister ("Meister"). Respondent contracted with Meister as the qualifying agent for Tropical Home Industries, Inc. Respondent failed to obtain a permit for the work performed at the Meister's. Respondent's failure to obtain a permit for the Meister job violated local building codes and Section 489.129(1)(n), Florida Statutes. DOAH Case No. 90-1900 The Grantz home is located at 10878 Granite Street, Boca Raton, Florida. The approximate amount of the contract price with the Grantz was $1,890.00. Respondent contracted for the Grantz job as a qualifying agent of Tropical Home Industries, Inc. Respondent began work at the Grantz residence on or about May 10, 1989. The work at the Grantz residence failed final inspection on July 12, 1989. Respondent wilfully violated applicable local building codes and laws on the Grantz project. Respondent wilfully disregarded local building codes and laws in connection with the Grantz project. Respondent deliberately violated applicable local building codes and laws in connection with the Grantz project. Respondent deliberately disregarded applicable local building codes and laws in connection with the Grantz project. On or about April 12, 1989, and April 17, 1989, Respondent contracted with Stephen Victor ("Victor") to install sliding glass doors at his home. The Victor residence is located at 9768 Majorca Place, Boca Raton, Florida. The contract price with Victor was $3,293.00. Respondent contracted with Victor as a qualifying agent of Tropical Home Industries, Inc. Victor paid a total deposit of $670.00 to Respondent. Respondent never began work at the Victor residence. On or about April 17, 1989, Respondent contracted with Vinton Beckett ("Beckett") to install windows at her home. The Beckett residence is located at 2501 N.W. 41st Avenue, Unit 302, Lauderhill, Florida. The contract price with Beckett was $1,684.00. Respondent contracted with Beckett as a qualifying agent of Tropical Home Industries, Inc. On or about October 29, 1988, Respondent contracted with Thomas and Sherry Maffetonne (the "Maffetonnes") to construct a patio enclosure at their home. The Maffetonne's residence is located at 22980 Old Inlet Bridge Drive, Boca Raton, Florida. The contract price for the work to be performed at the Maffetonnes was $4,350.00. Respondent contracted with the Maffetonnes as a qualifying agent for Tropical Home Industries, Inc. A five-year warranty on materials was given by Respondent for the work to be performed at the Maffetonne's. A one-year warranty on labor was given by Respondent for the work performed at the Maffetonne's. On or about June 6, 1989, Respondent contracted with Mr. and Mrs. Morton Wolfe (the "Wolfes") to install windows at their home. The Wolfe's residence is located at 7267 Huntington Lane, #204, Delray Beach, Florida. Respondent contracted with the Wolfes as the qualifying agent of Tropical Home Industries, Inc. Respondent failed to obtain a timely permit or call for required inspections at the Wolfe residence. DOAH Case No. 91-7951 On June 21, 1990, Tropical's general liability insurance coverage (policy number 891006GL327), produced by Steven Adams and Associates, Inc., (hereinafter "Adams and Associates") and afforded by Guardian P & C Insurance Company, expired. On July 17, 1990, Tropical issued a check to Adams and Associates in the amount of $2,475.00 to obtain general liability and workers' compensation insurance. Upon receipt of the check, Adams and Associates issued a Certificate of Insurance to the Davie (Florida) Building Department indicating that Tropical had general liability (policy number GL 235810) and workers' compensation insurance in force through July 17, 1991. After said Certificate of Insurance was issued, Tropical stopped payment on the check issued to Adams and Associates. Tropical failed to issue an additional check or remit payment of any kind, resulting in both the general liability and workers' compensation insurance being canceled, effective July17, 1990. In September of 1990, a Certificate of Insurance was submitted to the Davie Building Department indicating that Tropical had general liability insurance in effect from September21, 1990, until September 21, 1991. Said certificate had been altered in that the issue, effective, and expiration dates had been updated to reflect that the policy coverage was current and in force. The policy listed on the certificate (number 891006GL327, produced by Adams and Associates with coverage being afforded by Guardian P & C Insurance Company) expired on June21,1990, and was never renewed or kept in force after that date. The Davie Building Department had no other certificates or records indicating that Tropical had insurance coverage. Between July 17, 1990, and April 8, 1991, Tropical obtained five (5) building permits from the Davie Building Department. At no time during the aforementioned period did Tropical have general liability insurance, thereby violating Section 302.1(b) of the South Florida Building Code which requires that building permit applicants be qualified in accordance with PartI of Chapter 489, Florida Statutes. Licensees are required to maintain public liability insurance at all times as provided by rules promulgated pursuant to Part I of Chapter 489, Florida Statutes. Construction Industry Licensing Board records indicate that Tropical has general liability insurance coverage through Equity Insurance (hereinafter "Equity") of Hollywood, Florida. Effective June 8, 1988, Tropical's insurance with Equity was canceled. On February 20, 1991, Tropical entered into an agreement with Michael and Margaret Palomba (hereinafter "Palombas") to perform enclosure and remodeling work at the Palombas' residence located at 130 North East 5th Court, Ft. Lauderdale, Florida 33334. The approximate contract price was $11,978.00. On March 13, 1991, Tropical received a $2,994.50 deposit from the Palombas. On March 25, 1991, Tropical obtained a permit for the project from the Broward County Building Department. Subsequent to receiving the permit, Tropical removed an interior closet from the area that was to be remodeled. Subsequent to receiving the permit, Tropical removed interior plaster from the area that was to be remodeled. Subsequent to receiving the permit, Tropical removed exterior doors from the area that was to be remodeled. Tropical then stopped work stating that rotten wood had been discovered, and requested an additional $2,800.00 to continue with and complete the project. Tropical refused to perform any additional work without the Palombas agreeing to the added cost. Tropical failed to continue with the project pursuant to the original agreement. Tropical refused to continue with the project pursuant to the original agreement. Tropical failed to return any monies to the Palombas. In May 1991, the Palombas hired a second contractor, Dan Sturgeon, to complete the project for $13,830.00. On or about July 11, 1990, Tropical entered into an agreement with Don Romanello (hereinafter "Romanello") to construct a screen room on an existing slab at Romanello's residence located in Boca Raton, Florida. The contract price was $9,500.00. Tropical received $4,800.00 in payments from Romanello, but failed to obtain a permit or perform any work pursuant to the agreement. Tropical has failed to return any portion of Romanello's payments. Tropical refused to communicate with Romanello. Based on the preceding, Tropical committed misconduct in the practice of contracting. On or about June 23, 1990, Tropical entered into an agreement with Marcelina Marin (hereinafter "Marin") to construct a screen room at Marin's residence located in Broward County, Florida, for $4,021.00. Tropical received a $2,000.00 deposit from Marin at the time the agreement was entered into. Tropical failed to perform any work under the terms of the agreement. Tropical has failed to return Marin's deposit. Tropical has refused to return Marin's deposit. Based on the preceding, Tropical committed misconduct in the practice of contracting. DOAH Case No. 91-7493 On July 2, 1988, Respondent contracted with Anthony Antonelli ("Antonelli") to construct an aluminum roof over the patio and gutters of his residence at 9303 Laurel Green Drive, Boynton Beach, Florida. The price of the contract was $2,016.00. Antonelli paid a deposit of $500.00 to Tropical Home Industries. Respondent informed Antonelli that he would not be able to perform the work at the contracted price. Respondent never performed any work at the Antonelli's home. Respondent canceled the contract with Antonelli. Respondent failed to return the deposit paid by Antonelli to Tropical Home Industries. Testimony at Final Hearing Facts Applicable to All Cases Respondent is, and has been at all times hereto, a certified general and roofing contractor in the State of Florida, having been issued license number CG C040139 and CC 2042792. For all contracts and jobs referenced in all of the administrative complaints in these consolidated cases, Respondent acted through the contracting business with which he was associated and for which he was responsible in his capacity as a licensed contractor. DOAH Case No. 89-3902, The Barona and Carrow Complaints Respondent contracted with Rhonda Barona to build an addition to her home at 1251 Westchester Dr. East., West Palm Beach, Florida, for approximately $5,124. The work performed at the Barona residence took an unreasonable amount of time to complete. The permit issued to perform the work at the Barona residence was canceled and Respondent failed to obtain a final inspection. Respondent contracted with Sarah Carrow to build an addition at her home located at 1421 N. 70th Avenue, Hollywood, Florida, for approximately $14,460.60. Respondent allowed the permit to expire and failed to obtain required inspections at the Carrow residence. Respondent failed to fully comply with applicable local codes by failing to install a window or vent fan in the bathroom. DOAH Case No. 90-1900, The Grantz, Victor, Beckett, Maffetonne and Wolfe Complaints On or about March 31, 1989, Respondent contracted with John and Lori Grantz to install windows at 10878 Granite Street, Boca Raton, Florida, for the amount of $1,890.00. Work at the Grantz residence began on or about May 10, 1989. At the time work began, no permit had been obtained. A late permit was obtained on June 15, 1989, in violation of local codes. The work performed by Respondent at the Grantz residence failed final inspection on July 12, 1989, because the structure was not constructed as for the intended use. The windows which were installed were designed as a temporary structure, removable in cases of severe weather and not as a permanent enclosure. On or about April 12, 1989, and April 17, 1989, Respondent contracted with Stephen Victor ("Victor") to install sliding glass doors and windows at 9768 Majorca Place, Boca Raton, Florida, for the total amount of $3,293.00. Victor paid Tropical a total deposit of $670.00, but work never began. On or about April 17, 1989, Respondent contracted with Vinton Beckett ("Beckett") to install windows at 2501 N.W. 41st St., Unit 808, Lauderhill, Florida, in the amount of $1,684. A five-year warranty on materials and a one-year warranty on labor were provided to Beckett by Tropical. Respondent failed to obtain a timely permit or call for required inspections in violation of local law. Respondent failed to correct defects and deficiencies in the work performed at the Beckett residence in a reasonable amount of time. On or about October 29, 1988, Respondent contracted with Thomas and Sharee Maffetonne to construct a patio enclosure at 22980 Old Inlet Bridge Drive, Boca Raton, Florida, for the amount of $4,350.00. A five-year warranty on materials and a one-year warranty on labor were given. Respondent failed to correct defects and deficiencies in the work on the Maffetonne residence in a reasonable amount of time. On or about June 6, 1989, Respondent contracted with Morton Wolfe to install windows at 7267 Huntington Lane, #204, Delray Beach, Florida, for the amount of $1,668.13. Respondent failed to obtain a timely permit or call for required inspections at the Wolfe residence in violation of local codes. DOAH Case No. 90-1901 The Klokow Complaint On or about December 5, 1989, Respondent contracted with Mel Klokow, acting for Linda Klokow, for the construction of a screen porch with a roof to her home at 5292 N.E. 10th Terr., Ft. Lauderdale, Florida, for the sum of $4,473.00. Permit number 88-8085 was issued by the local building department. The work performed at the Klokow residence initially failed to pass the final inspection, and the Respondent failed to return to correct the code violations in a reasonable amount of time. DOAH Case Number 90-1902 The Meister Complaint In December of 1987, Respondent contracted to close in a screen porch for Janet Meister. Respondent failed to obtain a permit for the work performed, which is a violation of local building codes. DOAH Case Number 91-7493 The Antonelli Complaint On July 2, 1988, Respondent contracted with Anthony Antonelli ("Antonelli") to construct an aluminum roof over the patio and gutters at his residence at 9303 Laurel Green Drive, Boynton Beach, Florida. The price of the contract for the work to be performed at the Antonelli residence was $2,016.00. Antonelli remitted a deposit of $500 to the Respondent. Respondent informed Antonelli that he would not be able to perform said job for the contracted price and no work ever began. Respondent canceled the contract with Antonelli and failed to return the deposit to Antonelli. DOAH Case Number 91-7951 The Insurance, Palomba, Romanello and Marin Complaints On June 21, 1990, Tropical's general liability insurance coverage, policy number (891006GL327), produced by Stephen Adams & Associates, Inc., ("Adams & Associates") and afforded by Guardian Property & Casualty Company, expired. On July 17, 1990, Tropical issued a check to Adams & Associates in the amount of $2,475.00 to obtain and/or renew general liability and workers' compensation insurance. Upon receipt of the check, Adams & Associates issued a certificate of insurance to the Davie Building Department in Davie, Florida, indicating that Tropical had general liability (policy number 235810) and workers compensation insurance in force through July 17, 1991. After said certificate of insurance was issued, Tropical stopped payment on the check issued to Adams & Associates. Tropical failed to issue an additional check or remit payment of any kind resulting in the general liability and workers compensation insurance being canceled, effective July 17, 1990. In about September 1990, a certificate of insurance was submitted to the Davie Building Department indicating that Tropical had general liability insurance in effect from September 21, 1990, until September 21, 1991. Said certificate had been altered in that the issue, effective and expiration dates had been updated to reflect that the policy coverage was current and in force. The policy listed on the certificate (number 891006GL327), produced by Adams & Associates and afforded by Guardian Property & Casualty Company, expired on June 21, 1990, and was never renewed or kept in force after that date. The Davie Building Department has no other certificates or records indicating that Tropical has insurance coverage. Between July 17, 1990, and April 8, 1991, Tropical obtained five (5) building permits from the Davie Building Department. At no time during the aforementioned period did Tropical have general liability insurance thereby violating Section 302.1(b) of the South Florida Building Code which requires that building permit applicants be qualified in accordance with Part I of Chapter 489, Florida Statutes. Licensees are required to maintain public liability insurance at all times as provided by rules promulgated pursuant to Part I of Chapter 489, Florida Statutes. Construction Industry Licensing Board ("CILB") records indicate that Tropical has general liability insurance coverage through Equity Insurance Company ("Equity") of Hollywood, Florida. Effective June 8, 1988, Tropical's insurance with Equity was canceled. On February 20, 1991, Tropical entered into an agreement with Michael and Margaret Palomba (the "Palombas") to perform enclosure and remodeling work at the Palomba's residence located at 130 N.E. 5th Ct., Ft. Lauderdale, Florida 33334. The approximate contract price was $11,978.00. On March 13, 1991, Tropical received a $2,994.50 deposit from the Palombas. On March 25, 1991, Tropical obtained a permit for the project from the Broward County Building Department. Subsequent to receiving the permit, Tropical removed an interior closet and exterior doors from the area that was to be remodeled. Tropical then stopped work stating that rotten wood had been discovered, and requested an additional $2,800.00 to continue with and complete the project. Tropical refused to perform any additional work without the Palombas agreeing to the added cost. Tropical failed or refused to continue with the project pursuant to the original agreement and failed to return any monies to the Palombas. In May, 1991, the Palombas hired a second contractor, Dan Sturgeon, to complete the project for $13,000.00. 156. Based on the foregoing, Tropical committed misconduct in the practice of contracting. On or about July 11, 1990, Tropical entered into an agreement with Don and Norma Romanello (the "Romanellos") to construct a screened room on an existing slab at the Romanello's residence located in Boca Raton, Florida. The contract price was $9,500. Tropical received a $4,800.00 payment from the Romanellos but failed to perform any work pursuant to the agreement. Tropical has failed or refused to return any portion of the Romanellos payments and has refused to communicate with the Romanellos. Based on the preceding, Tropical committed misconduct in the practice of contracting. On or about June 23, 1990, Tropical entered into an agreement with Marcelina Marin to construct a screened room at Marin's residence located in Broward County, Florida for $4,021.00 Tropical received a $2,000.00 deposit at the time the agreement was entered into. Tropical failed to perform any work under the terms of the agreement, and has failed or refused to return Marin's deposit. Based on the preceding, Tropical committed misconduct in the practice of contracting. DOAH Case Number 92-0370 The Pappadoulis Complaint On or about February 11, 1990, the Respondent contracted with John Pappadoulis ("Pappadoulis") to remodel a Florida room for the agreed upon amount of $11,448.00 at his residence located at 983 Southwest 31st Street, Fort Lauderdale, Florida. Respondent received a deposit of $648.00, but never obtained a permit nor began work. The Respondent failed or refused to return Pappadoulis' deposit. John Pappadoulis has since passed away. Aggravating and Mitigating Circumstances Monetary Damages Several of the customers in these cases suffered monetary damages. The Baronas had to hire an attorney to deal with the Respondent. The Baronas also incurred additional costs in the work they performed to complete the contract. John and Lori Grantz also suffered monetary damages due to their dealings with the Respondent. The work at the Grantz residence was never completed by the Respondent. The Respondent filed a lien on the Grantz property and also filed a lawsuit to receive the full amount of the contract price. The Grantz had to hire an attorney to obtain legal advice and to defend the lawsuit. The Grantz prevailed in that lawsuit and a judgment was entered requiring the Respondent to refund the $500.00 cash deposit. The Grantz also spent at least $150.00 on attorney fees. The deposit money was never returned and none of their costs were ever reimbursed by the Respondent. Steven Victor also sustained monetary damages in his dealings with the Respondent. Victor paid the Respondent $670.00 as a deposit. No work was ever performed. After requesting the return of his deposit money and failing to receive it, Victor filed a civil action against the Respondent. Judgment was entered in favor of Victor, but the judgment was never paid. The Maffetonnes also sustained monetary damages in their dealings with the Respondent. The Respondent agreed to refund a portion of the contract money to the Maffetonnes due to a problem with the carpet he installed incorrectly, but failed to ever refund any money. The Maffetonnes therefore paid for goods which were defective, and never received a compensatory credit. Klokow also sustained monetary damages in his dealings with the Respondent Because of continuing roof problems, Klokow had to hire an independent roofing expert to inspect the roof and prepare a report. Mr. and Mrs. Palomba also sustained monetary damage due to their dealings with the Respondent. When the Respondent abandoned the Palomba job, the Palombas were forced to hire a second contractor at a higher contract price. The Respondent's actions also caused monetary damages to Antonelli, Pappadoulis, Marin, and Romanello. In each case, the homeowner paid a deposit to the Respondent, and the Respondent failed to ever perform work or return any of the deposit money. The Antonellis paid $500.00, Pappadoulis paid $648.00, Marin paid $2,000.00, and Romanello paid $4,800.00. Actual Job-Site Violations of Building Codes or Conditions Exhibiting Gross Negligence, Incompetence, or Misconduct by the Licensee Several of the jobs involved in these cases had actual job site violations of building codes or conditions which exhibited gross negligence, incompetence, or misconduct by the Respondent which had not been resolved as of the date of the formal hearing. At the Barona residence, the framing inspection failed twice before finally being passed a third time; the lath inspection failed three times before finally passing on the fourth time; and the final inspection failed and was never satisfactorily completed by the Respondent. At the Carrow residence, the Respondent failed to install a window or vent fan in the bathroom of the room addition which he installed. In addition to the building code violation, the work performed was incompetent as the structure installed leaked for many months. Further, the original permit expired prior to a final inspection ever being obtained. At the Grantz residence, the Respondent exhibited incompetence and misconduct by installing windows that he knew or should have known were unsuitable for the purposes specified by the customer. Severity of the Offense The large number of violations established in these cases indicates that the Respondent is a serious threat to the public. These violations establish that the Respondent had a pattern of failing to conduct any meaningful supervision of work in progress. And perhaps most serious of all is his frequent act of soliciting deposits for projects he apparently had no intention of even beginning, much less finishing. This latter practice borders on constituting some form of larceny. Danger to the Public The Respondent is a danger to the public in two ways. First, he is a financial threat to the public, most significantly by his practice of taking deposits for jobs he apparently did not intend to perform. Second, he is a threat to public safety, because the work he performs is often done in a haphazard, careless manner. The Number of Repetitions of Offenses As is obvious from the findings of fact and conclusions of law in this Recommended Order, the Respondent is guilty of numerous repeated offenses which occurred over a period of approximately three years. The Respondent's numerous offenses are indicative of an attitude of contempt or disregard for the requirements of the applicable rules and statutes. Number of Complaints Against Respondent The charges in these cases are based on fifteen separate customer complaints to the Department of Professional Regulation regarding the Respondent. Further, the Palm Beach County Construction Industry Licensing Board received four complaints from homeowners regarding the Respondent 5/ and the Broward County Consumer Affairs Department received twenty-nine complaints regarding the Respondent. 6/ Such a large number of complaints indicates that the Respondent's shortcomings were not isolated events, but represent a recurring problem. The Length of Time the Licensee Has Practiced The Respondent was first licensed as a state general contractor in 1987. He obtained his roofing contractor license shortly thereafter. The Respondent's licenses were placed under emergency suspension in August of 1991. Damage to the Customers The damages, monetary and otherwise, suffered by the Respondent's customers has already been addressed. In addition, all of the Respondent's customers mentioned in the findings of fact suffered a great deal of aggravation, stress, and frustration in dealing with the Respondent. Penalty and Deterrent Effect In these cases, the proof submitted demonstrates that no penalties short of revocation of the Respondent's licenses and imposition of the maximum amount of fines will act as a deterrent to the Respondent and others and as appropriate punishment for the many violations established by the record in these cases. Efforts at Rehabilitation There is no persuasive evidence in the record of these cases that the Respondent has become, or is likely to become, rehabilitated. To the contrary, the greater weight of the evidence is to the effect that the Respondent is unwilling or unable to conform his conduct to the requirements of the statutes and rules governing the practice of contracting.

Recommendation Based upon the foregoing findings of fact and conclusions of law, IT IS RECOMMENDED: That the Respondent be found guilty of all of the violations charged in each Administrative Complaint and Amended Administrative Complaint as noted in the conclusions of law, and that the Respondent be disciplined as follows: The Respondent be required to pay an administrative fine in the amount of $5,000.00 for each of the twenty-nine counts of violations charged and proved, for a grand total of $145,000.00 in administrative fines; The Respondent's license numbers CG C040139 and CC C042792 be revoked; and The Respondent be required to pay restitution to the following Complainants in the following amounts: Steven Victor - $670.00; John Grantz - $650.00; Don Romanello - $4,800.00; Marcelina Marin - $2,000.00; Anthony Antonelli - $500.00; John Pappadoulis' next of kin - $648.00. All restitution shall earn 12% interest per annum from the date the Complainants paid their deposit to Respondent. DONE AND ENTERED at Tallahassee, Leon County, Florida, this 21st day of October, 1992. MICHAEL M. PARRISH, Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 904/488-9675 Filed with the Clerk of the Division of Administrative Hearings this 21st day of October, 1992.

Florida Laws (6) 120.57455.227489.105489.119489.1195489.129