Elawyers Elawyers
Washington| Change
Find Similar Cases by Filters
You can browse Case Laws by Courts, or by your need.
Find 49 similar cases
CONSTRUCTION INDUSTRY LICENSING BOARD vs. GEORGE SOLER, 84-002529 (1984)
Division of Administrative Hearings, Florida Number: 84-002529 Latest Update: Feb. 06, 1986

Findings Of Fact At all times material to this proceeding Respondent was a registered building contractor in the State of Florida having been issued license number RB 0009164. At no time material to this proceeding was Domingo Alonzo (a/k/a Domingo Alonzo) registered, certified or otherwise licensed by the Florida Construction Industry Licensing Board. Respondent and Alonzo signed and submitted a proposal to Myron M. Gold and Roberta Fox for remodeling and additions to their residence located at 1550 Zuleta Avenue, Coral Gables, Florida in accordance with plans prepared by Frese - Camner Associates on file with the City of Coral Gables, Florida, File No. 2897 for a contract price of $65,940.00 with draw schedules attached. On December 6, 1982, Myron M. Gold and Roberta Fox (Homeowners) accepted the Proposal (Contract). On December 6, 1982, the Homeowners paid Respondent and Alonzo jointly $3,297.00 in accordance with the contract whereby they were to receive 5 percent of the contract amount as a down payment upon signing. The draw schedule provided for a 10 percent retainage from each draw which was to be paid to Respondent and Alonzo upon completion and the issuance of a certificate of occupancy. On December 21, 1982 the Homeowners paid Respondent and Alonzo jointly $2,025.00 which represented a draw on Schedule I - Item 3 for $1,350.00, Schedule II - Item 2 for $360.00 and Item 5 for $315.00. On December 17, 1982 the Homeowners and Respondent filed the affidavit required by ordinance with the City of Coral Gables for the purpose of having a building permit issued covering the work under the contract. 9. On January 19, 1983 Respondent using his building contractors license applied for building permit to cover the work anticipated under the contract and on the same day was issued building permit, No. 28214. Under the contract the Homeowners were to pay for the building permit and the bond required by the city. On January 26, 1983 the Homeowners paid Respondent and Alonzo jointly $3,000.00 which along with a payment on January 27, 1983 of $500.00 and January 31, 1983 of $544.60 represented a draw on Schedule I - Item 2 for $405.00, Item 5 for $1,260.00, Item 6 for $1,547.10 and Item 13 for $832.50. All payments from December 6, 1982 through January 31, 1983 under the contract by the Homeowners totaled $9,366.50 and were paid jointly to Respondent and Alonzo. On February 4, 1983 Respondent and Alonzo entered into an agreement, prepared by Myron Gold in the law office of Gold and Fox, whereby the Homeowners were to pay the balance of the funds remaining under the contract to Alonzo individually. After this date all payments were made to Alonzo. It was the Homeowners understanding after the February 3, 1983 agreement that Respondent would still be responsible for the supervision of the construction although they never saw Respondent again until October 1983. Edward Borysiewicz testified that he dealt with Respondent during March 1983 when he made the floor slab inspection on March 3, 1983 and the columns inspection on March 14, 1983. The record is clear that shortly after the agreement on February 3, 1983 Respondent no longer came to the construction site and supervised the work of Alonzo. On February 8, 1983 the Homeowners paid Alonzo $3,060.00 which represented a draw on Schedule I - Item 1 for $810.00, Item 5 for $1,417.50 and Item 13 for $832.50. On February 28, 1983 the Homeowners paid Alonzo $3,155.40 which represented a draw on Schedule I - Item 4 for $1,705.50 and $729.90 for extras apparently not covered by the contract but whether the balance of check No. 1161 (Pet. Ex. 13) of $720.00 was for payment under the contract or for extras is not shown in Petitioner's Exhibit No. 15. On March 18, 1983 the Homeowners paid Alonzo $1,000 which represented a draw on Schedule I - Item 9 for $819.00. Again whether the balance of check No. 1206 (Petitioner's Exhibit No. 13) of $181.00 is for payment under the contract or for extras is not shown in Petitioner's Exhibit No. 15. On March 21, 1983, the Homeowners paid Alonzo $6,400.00 which represented a draw on Schedule I - Items 10, 11, 12, 14 and 15. On March 21, 1983 the Homeowners paid Alonzo $2,166.90 but Petitioner's Exhibit No. 15 does not list check No. 1210 as being a payment under the contract or for extras. On March 31, 1983 the Homeowners paid Alonzo $4,230.00 which represents a draw under Schedule I - Item 7 for $2,520.00 and a payment for extras not covered under the contract in the amount of $1,710.00. On April 21, 1983 the Homeowners paid Alonzo $5,207.40 which represented a draw Schedule I - Items 1, 5, 6, 9 and 14. On June 24, 1983 the Homeowners paid Alonzo $5,788.00 which represented a draw on Schedule I - Item 12 for $667.00, Item 14 for $3,024.00 and payment for extras not under contract for $2,097.00. After March 14, 1983 Respondent was not seen on the job site and there was no longer any apparent supervision of Alonzo by Respondent. After Respondent left the job site there was no licensed building contractor involved in the construction. After Respondent left the construction site the Homeowners soon realized that Alonzo did not know how to proceed with the work and experienced problems with the pace and manner in which the work was being accomplished. On July, 1983, Alonzo stopped working altogether. Although the Homeowners were aware of the problems that Alonzo was having with the construction and that Respondent was not on the job, the record does not reflect that they ever attempted to contact Respondent after the meeting on February 3, 1983. On August 1, 1983 the Homeowners notified Respondent and Alonzo that the contract had been terminated. The Homeowners paid Respondent and Alonzo $42,174.20 total under the contract (pages 1-5, Petitioner's Exhibit No. 15) and paid Alonzo $10,766.37 for extras (Pages 6- 10, Petitioner's Exhibit No. 15). On August 31, 1983 the Homeowners paid Edward Bryant, plastering contractor the sum of $3,100.00 for plastering performed by Edward Bryant. This was for work under the contract that had not been completed or work necessary to correct problems that were already completed. Roberta Fox testified that there were no extras on plaster, however, page 7, line 11 and page 9, line 21 of Petitioner's Exhibit 15 indicates that there was extra plastering. On August 29, 1983 and September 29, 1983 the Homeowners paid Southwest Plumbing Services, Inc. the total amount of $4,875.00 for work contemplated under the contract that had not been completed or needed correction. Homeowners had paid Alonzo $3,591.00 for plumbing under the contract. Both Alonzo and Southwest Plumbing, Inc. were paid for extra plumbing not covered by the contract in the amount of $567.00 and $391.50, respectively by the Homeowners. From September 13, 1983 through June 13, 1984 the Homeowners paid Charles Brueg, Jim Brueg, Charles Buffington and Dan, Inc. the total amount of $4,192.91 for electrical work contemplated under the contract that was not completed or required correction after Alonzo left the construction site. Page 6 lines 6 and 11 of Petitioner's Exhibit No. 15 indicate that there were extras not covered by the contract. The total amount for electricity contemplated by the contract was $3,649.00. Alonzo was paid $2,627.10 under the contract and $1,710.00 for extras. The Homeowners were required to obtain the services of an air conditioning contractor to complete the work contemplated under the contract after Alonzo left the job site and as a result were required to pay Cameron, Inc., the air conditioning contract the amount of $5,181.60 between August 16, 1983 and January 24, 1984. The total amount contemplated under the contract was $3,600.00 of which $1,134.00 had been paid to Alonzo. Debris was dumped in the swimming pool requiring the Homeowners to pay $7,000 to refurbish the swimming pool. This amount included the repair contemplated under the contract and the extra work caused by Alonzo. The contract contemplated $2,300.00 for repairs of which none had been paid to Respondent or Alonzo. The Homeowners paid $1,150.00 to a painting contractor to finish the painting contemplated under the contract. Alonzo had been paid $1,125.00 for painting. (Petitioner's Exhibit No. 15) The contract provided $2,500.00 for all painting required under the contract. Respondent failed to notify the building department that he was no longer responsible for the construction. After the Homeowners terminated the contract due to Respondent's and Alonzo's nonperformance, the Homeowners had to expend a substantial amount of extra money to complete the construction. The evidence is insufficient to determine an exact or approximate amount. Roberta Fox's testimony was conflicting with regard to her understanding as to whether or not the Respondent would continue to supervise the construction after the meeting in the Homeowners' law office on February 3, 1983 when Respondent and Alonzo entered into this agreement. Myron Gold testified that it was his understanding that Respondent would continue to supervise Alonzo after the agreement. However, the Homeowners action in this regard subsequent to February 3, 1983, in making no effort to bring the matter to a "head" and requiring Respondent to supervise the work or terminate the contract and in continuing to deal with Alonzo although Homeowners were aware shortly after February 3, 1983 that Alonzo could not perform without Respondent's supervision and that they knew Respondent was not on the job, tends to show that they were aware or should have been aware that Respondent was no longer involved in the day to day supervision of the construction. Alonzo installed a fireplace pursuant to the contract that the building department determined to be a fire hazard and recommended against its use. The Homeowners applied for and were granted a "owner/builder" permit on September 1, 1983 and requested cancellation of the building permit issued to Respondent which was cancelled on September 6, 1983. They have not received a certificate of occupancy because the building department has not performed the following inspection: electrical final; plumbing final; air conditioning final; roofing final and public works final. The building department would have issued a "stop-work order" had it been aware that Respondent was not supervising the construction and would have required the Homeowners to obtain another licensed building contractor or proceed as a owner/builder. The plans prepared by Frese-Camner Associates that were made a part of the contract by reference were not introduced into evidence with the contract and thus the record is insufficient to determine what was required to meet the specifications of the plans and thereby determine if the specifications had been met. There was a permit issued for the septic tank and drain field which work was started in December, 1982. The construction of the house itself was started in January 1983. The first inspection (foundation) on the house was made by the building department of January 21, 1983.

Recommendation Based on the findings of fact and conclusions of law recited herein, it is Recommended that the Board enter a final order finding Respondent guilty of violating Section 489.129(1)(h)(k)(m), Florida Statutes (1981) and for such violations it is Recommended that the Board assess the Respondent with an administrative fine of $500.00 and suspend the Respondent's contracting license for a period of three (3) years, provided, however, that if Respondent submits to the Board competent and substantial evidence of restitution to Myron Gold and Roberta Fox within one (1) year from the date of the final order herein, then the suspension shall be stayed and Respondent placed on probation for the balance of the suspension. Respectfully submitted and entered this 6th day of February, 1986, in Tallahassee, Florida. WILLIAM R. CAVE Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 6th day of February, 1986. APPENDIX TO RECOMMENDED ORDER IN CASE NO. 84-2529 The following constitutes my specific rulings pursuant to Section 120.59(2), Florida Statutes, on all of the proposed findings of fact submitted by the parties to this case. RULINGS ON PROPOSED FINDINGS OF FACT SUBMITTED BY THE PETITIONER: Adopted in Finding of Fact 1. Adopted in Finding of Fact 2. Adopted in Finding of Fact 3 but clarified. Adopted in Findings of Fact 4 and 5. Adopted in Finding of Fact 4. Adopted in Finding of Fact 6. Adopted in Finding of Fact 5. Adopted in Finding of Fact 9. Adopted in Finding of Fact 9. Adopted in Finding of Fact 9. Adopted in Finding of Fact 9. Adopted in Finding of Fact 10. Adopted in Finding of Fact 11. Adopted in Finding of Fact 12 except clarified as to the last date on construction site. Adopted in Finding of Fact 13. Adopted in Finding of Fact 14 but clarified. Adopted in Finding of Fact 15 but clarified. Adopted in Finding of Fact 16. Adopted in Finding of Fact 17 but clarified. Adopted in Finding of Fact 15 but clarified. Adopted in Finding of Fact 19. Adopted in Finding of Fact 20 but clarified. Adopted in Finding of Fact 21. Adopted in Finding of Fact 11. Adopted in Finding of Fact 21. Adopted in Finding of Fact 22. Adopted in Findings of Fact 22 and 23. Adopted in Finding of Fact24 but clarified to show correct amount paid under contract as indicated by Petitioner's Exhibit 15. Adopted in Finding of Fact 25 but clarified to show that extra plastering not under contract was required. Adopted in Finding of Fact 26. Adopted in Finding of Fact 26. Adopted in Finding of Fact 26. Adopted in Finding of Fact 27. Adopted in Finding of Fact 27. Adopted in Finding of Fact 27. Adopted in Finding of Fact 27. Adopted in Finding of Fact 27. Adopted in Finding of Fact 27. Adopted in Finding of Fact 28. Adopted in Finding of Fact 28. Adopted in Finding of Fact 28. Adopted in Finding of Fact 28. Adopted in Finding of Fact 29 but clarified. Adopted in Finding of Fact 30 but clarified. Rejected as immaterial. Rejected as not supported by competent substantial evidence. Rejected as not supported by substantial competent evidence. Adopted in Finding of Fact 31. Rejected as immaterial. Adopted in Finding of Fact 32 but clarified to show that the record does not support a figure that approximate $32,000.00. Rejected as not supported by substantial competent evidence even though the Homeowners' testimony supported this fact because the Homeowners' actions with regard to Respondent after February 3, 1983, was to the contrary. Adopted in Finding of Fact 33. Adopted in Finding of Fact 34. Adopted in Finding of Fact 34. Adopted in Finding of Fact 34. Adopted in Finding of Fact 35. Adopted in Finding of Fact 36. Adopted in Finding of Fact 36. RULINGS ON PROPOSED FINDINGS OF FACT SUBMITTED BY RESPONDENT: No Findings of Fact was submitted by the Respondent. COPIES FURNISHED: James Linnan, Executive Director Department of Professional Regulation Construction Industry Licensing Board Post Office Box 2 Jacksonville, Florida 32202 Fred Roche, Secretary Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 Salvatore A. Carpino, General Counsel Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 W. Douglas Beason Esquire Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 Mr. George J. Soler, Pro Se 3315 S.W. 96th Avenue Miami, Florida 33165

Florida Laws (6) 120.57155.40489.105489.113489.127489.129
# 1
CONSTRUCTION INDUSTRY LICENSING BOARD vs. JAMES RASKIN, 77-000624 (1977)
Division of Administrative Hearings, Florida Number: 77-000624 Latest Update: Aug. 10, 1977

Findings Of Fact The parties stipulated to the fact that James Baskin holds registered contractor's license number BC 0011300. Raskin's registered general contractor's license was issued by the Florida Construction Industry Licensing Board. Prior to the commencement of the hearing, the Hearing Officer held that the record of the proceedings for the Cape Coral Board could be filed as a late filed exhibit in this cause in order that the Florida Construction Industry Licensing Board could review the Cape Coral Board's action pursuant to its authority under Section 468.112(2)(f), Florida Statutes. Ambassador Homes contracted with Sam and Marie Franzella for the construction of a single family residence to be constructed on the property located on Lots 41-42, Block 1224, Cape Coral Unit 19, Section 32-33, Township 44 South, Range 24 East. Stucky Well Drilling was initially contacted by an unknown agent of Ambassador Homes on January 1, 1975, and directed to drill a well, and install a deep well jet pump and tank at the location stated above. On January 20, 1975, Marion, a secretary for Ambassador Homes, called Stucky Well Drilling and directed that Stucky Well Drilling install the well and equipment as soon as possible. On January 21, 1975, a 210 foot well was drilled on the property described above and on January 23, 1975, a Mr. Green from Ambassador Homes called and requested that the tank and equipment be installed immediately. Mr. Hall, an employee of Stucky Well Drilling, installed all the equipment as ordered on January 23, 1975. On January 24, 1975, a bill in the amount of Six Fifty Dollars ($650.00) was sent to Ambassador Homes for the work performed on the property described above. Ambassador Homes was a corporation engaging in residential contracting and operating under the license of James Raskin. Ambassador Homes did not pay Stucky Well Drilling the bill for the drilling of the well and installation of the equipment on the property described in paragraph 3 above. Subsequently Stucky Well Drilling brought suit against Ambassador Homes, Inc., in the County Court of Lee County and obtained final judgment in the amount of Six Hundred Fifty Dollars ($650.00) plus costs. This judgment was entered on December 2, 1975.

Recommendation Based on the foregoing findings of fact and conclusions of law, the Hearing Officer recommends that the Florida Construction Industry Licensing Board suspend the license of James Raskin as a registered general contractor until he presents satisfactory proof to the Board of his financial qualifications to engage in the contracting business. DONE and ORDERED this 27th day of May, 1977, in Tallahassee, Florida. STEPHEN F. DEAN Hearing Officer Division of Administrative Hearings Room 530, Carlton Building Tallahassee, Florida 32304 (904) 488-9675 COPIES FURNISHED: Barry Sinoff, Esquire 1010 Blacks tone Building Jacksonville, Florida 32202 James Raskin 1810 S. E. 44th Street Cape Coral, Florida 33904 Mr. J. K. Linnan Executive Director Florida Construction Industry Licensing Board Post Office Box 8621 Jacksonville, Florida 32211

# 2
CONSTRUCTION INDUSTRY LICENSING BOARD vs. DAVID H. HAMILTON, 79-000018 (1979)
Division of Administrative Hearings, Florida Number: 79-000018 Latest Update: Apr. 28, 1980

Findings Of Fact At all times pertinent to these proceedings, Hamilton held registered residential contractors license number RR0015037. Hamilton agreed to construct a house in Clearmont, Florida, with a completion date no later than May 1, 1977, for Robert J. and Margaret M. Phlepsen. The construction price was $75,000.00. After construction of the house it was discovered that there existed two violations of the Southern Building Code. First, the "step-down" from the kitchen to the garage was an eleven inch riser contrary to the code requirement that the height of a riser shall not exceed seven and three quarters inches. The second violation occurred through the use of 2 X 8 joists where the code would require 2 X 10 joists. The extra high riser between the kitchen and the garage was apparently caused by an oversight. Hamilton merely failed to install an intermediate step at that location. The second violation occurred because the owner and Hamilton agreed to use the smaller joists in order to save money on the contract price. In neither case is there sufficient evidence to establish that Hamilton's violations were willful or deliberate as alleged in the Administrative Complaint. On June 6, 1978, the Lake County Board of Examiners suspended Hamilton's Lake County Certificate of Competency because of violations of building code requirements in the construction of Phlepsen's house.

# 3
CONSTRUCTION INDUSTRY LICENSING BOARD vs RICHARD ALAN MERRILL, 96-000669 (1996)
Division of Administrative Hearings, Florida Filed:Sanford, Florida Feb. 05, 1996 Number: 96-000669 Latest Update: Jul. 15, 2004

The Issue Whether disciplinary action should be taken against Respondent's license to practice contracting, License Number CB C043621, based on the violations of Section 489.129(1), Florida Statutes, as charged in the Administrative Complaint filed against Respondent on July 15, 1995.

Findings Of Fact Based on the evidence and the testimony of witnesses presented and the entire record in this proceeding, the following facts are found: At all times pertinent to this proceeding, Respondent was a Certified Building Contractor, having been issued license number CB C043621, by the Florida Construction Industry Licensing Board. At all times pertinent to this proceeding, Respondent was licensed as an individual. At no time pertinent to this proceeding was Respondent the licensed qualifying agent for Merrill Homes. On or about June 17, 1992, Kathy Rose and Respondent, d/b/a Merrill Homes, executed a Letter of Intent to build a house for the Roses in the Heathrow Woods subdivision in Seminole County, Florida. At the time the Letter of Intent was signed, Kathy Rose gave Respondent a check for $2,500.00 as a partial deposit. Subsection D of the Letter of Intent provided that "[s]hould the Buyers not proceed with construction of the residence, the Builder will refund the Buyers' deposit less any expenses incurred on the Buyers' behalf by the builder." On or about June 25, 1992, Respondent stopped by the Rose residence and picked up a second check for $2,500.00 made out to Merrill Homes by Jeff Rose as the second half of the Rose's $5,000.00 deposit. On or about August 10, 1992, Respondent, d/b/a Merrill Homes, and Jeff and Kathy Rose executed a contract to build a house in the Heathrow Woods subdivision as described in the Letter of Intent. The contract executed between Respondent and the Roses did not list Respondent's state contractor's license number. Respondent provided the Roses with a set of drawings of the proposed house, but did not provide the Roses with any other goods or services. Performance by Respondent under the contract was contingent upon the sale of the Roses' existing house. From the time the contract was signed until about October or November 1993, the Roses were unable to sell their existing house. Therefore, no work as performed by Respondent under the contract except for the production of the drawings of the house. In October or November 1993, Heathrow Realty contacted the Roses and informed them that someone was interested in the lot that they had placed a down payment on in Heathrow Woods Subdivision. Since their existing house had not sold in over a year, the Roses decided to release their option on the lot in Heathrow Woods and to cancel the contract with Respondent under the terms of the Letter of Intent. Kathy Rose contacted Respondent in November 1993 and informed him that they had released the lot. They requested that their deposit be returned from Respondent under the terms of the Letter of Intent. Respondent informed Kathy Rose that he would have their deposit refunded sometime after the first of December 1993. Having heard nothing from Respondent, the Roses had their attorney send a letter, dated December 30, 1993, to Respondent demanding a refund of their deposit. In January 1994, Kathy Rose once again contacted Respondent via telephone. At that time, Respondent informed Ms. Rose that their refund would only be $500.00, the balance of their deposit having been used for the house plans Respondent had provided. Respondent also informed Ms. Rose that he would mail an accounting to her. Respondent has not provided the Roses with an accounting, refunded all or any part of their deposit, or had any contact with them whatsoever since January, 1994. Examination of the plans, supplied to the Roses by Respondent, indicated that they were not really house plans per se, but rather hand-drawn sketches of a floor plan. The plans have no value with respect to their use in building the house depicted and could not be used to obtain a building permit in Seminole County. The plans Respondent supplied the Roses are valued somewhere between one and two hundred dollars. As a Certified Building Contractor, Respondent knew the actual value of the plans he supplied to the Roses. Respondent knowingly attempted to deceive the Roses by making false statements as to the value of the plans in order to deprive the Roses of a substantial portion of their down payment that they were entitled to have refunded to them.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is recommended that the Construction Industry Licensing Board enter a final order, as follows: Dismissing Counts II and IV of the Administrative Complaint. Finding Respondent guilty of violating Sections 489.129(1)(c), (g), (j), (m) and (n), Florida Statutes ( Supp. 1992). Suspending Respondent's license as a Certified Building Contractor for a period of three months, and imposing an administrative fine in the amount of $1,500,and requiring, as a condition of reinstatement, restitution to Jeff and Cathy Rose in the amount of $4,800, and such other reasonable and necessary conditions as the Board may require. DONE and ENTERED this 13th day of June, 1996, in Tallahassee, Florida. DANIEL M. KILBRIDE, Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 13th day of June, 1996. APPENDIX TO RECOMMENDED ORDER, CASE NO. 96-0669 To comply with the requirements of Section 120.59(2), Florida Statutes (1993), the following rulings are made on the parties' proposed findings of fact: Petitioner's Proposed Findings of Fact. Accepted in substance: paragraphs 1-19, 21-24. Rejected as subsumed : paragraph 20. Respondent's Proposed Findings of Fact. Respondent did not submit proposed findings of fact. COPIES FURNISHED: Paul F. Kirsch, Esquire Senior Construction Attorney G. W. Harrell, Esquire Lead Construction Attorney Department of Business and Professional Regulation 1940 North Monroe Street Tallahassee, Florida 32399-0792 Richard Alan Merrill 813 Largo Court Apopka, Florida 32703 Richard Hickok Executive Director Department of Business and Professional Regulation Construction Industry Licensing Board 7960 Arlington Expressway, Suite 300 Jacksonville, Florida 32211-7467 Lynda L. Goodgame, Esquire Department of Business and Professional Regulation Northwood Centre 1940 North Monroe Street Tallahassee, Florida 32399-0792

Florida Laws (4) 120.57455.227489.119489.129 Florida Administrative Code (2) 61G4-17.00161G4-17.002
# 4
CONSTRUCTION INDUSTRY LICENSING BOARD vs. K. C. MOORE, 77-000496 (1977)
Division of Administrative Hearings, Florida Number: 77-000496 Latest Update: Sep. 08, 1977

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, the Hearing Officer would recommend that no action be taken against the licenses of K. C. Moore as a registered builder contractor. In addition, the testimony at the hearing revealed that subsequent to the institution of this complaint that Dr. 0. Rao, M.D., did make application to the Florida Construction Industry Licensing Board for licensure as a contractor, that his application was approved, and that upon successful completion of the Board's examination he was licensed. If K. C. Moore is in fact guilty of aiding or abetting or knowingly combining or conspiring with a person to violate Part II, Chapter 468, the person with whom he combined or conspired or who he aided or abetted was Dr. John 0. Rao. Although the Board may be limited under the statutory provisions in denying Dr. Rao the license, assuming the Board rejects the Hearing Officer's Conclusions of Law and finds the facts constitute a violation of the statutory provisions, there is an absence of essential fairness to proceed against the licenses of K. C. Moore while licensing the individual with whom he contracted. The disparity in treatment of K. C. Moore and Dr. John 0. Rao is a factor which must be considered by the Board. DONE and ORDERED this 20th day of July, 1977, in Tallahassee, Florida. STEPHEN F. DEAN, Hearing Officer Division of Administrative Hearings Room 530, Carlton Building Tallahassee, Florida 32304 (904) 488-9675 COPIES FURNISHED: Barry Sinoff, Esquire 1010 Blackstone Building Jacksonville, Florida 32202 R. Stephen Miles, Jr., Esquire Mile and Cumbie Post Office Box 517 Kissimmee, Florida 32741 Mr. J. K. Linnan Executive Director Florida Construction Industry Licensing Board Post Office Box 8621 Jacksonville, Florida 32211 ================================================================= AGENCY FINAL ORDER ================================================================= STATE OF FLORIDA FLORIDA CONSTRUCTION INDUSTRY LICENSING BOARD FLORIDA CONSTRUCTION INDUSTRY LICENSING BOARD, Petitioner,

# 5
CONSTRUCTION INDUSTRY LICENSING BOARD vs. S. A. STONE, 85-000690 (1985)
Division of Administrative Hearings, Florida Number: 85-000690 Latest Update: Jan. 16, 1986

The Issue The issue for consideration was whether Respondent's license as a registered residential contractor should be disciplined because of the alleged misconduct outlined in the two Administrative Complaints filed in this case.

Findings Of Fact At all times pertinent to the Administrative Complaint filed herein, Respondent was a registered residential contractor in the State of Florida having been issued license number RR 0010134. Michael P. Freeman (a/k/a Dennis Freeman) was at no time material to the allegations considered herein a registered, certified, or otherwise licensed individual on record with CILB in Florida. In July 1983, Respondent and Dennis Freeman agreed to form a corporation for the purpose of home construction in Florida to be known as D & S Homebuilders, Inc. (D & S). The officers of this corporation were to be: President S. A. Stone (Respondent) Vice President Dennis Freeman Sec. Treas. Kristina Freeman The letter from Respondent to his attorney, drafted and written by Ms. Via, but signed by Respondent, requesting that the corporation be established, provided that Freeman was to be responsible for all materials, maintenance, labor, bills, etc., and Respondent was to be responsible only for the "quality of work." This letter served as an agreement between Freeman and Stone which was to be separate and apart from the Articles of Incorporation. Respondent was to receive a 7% commission on "all labor done or any type of construction by Mr. Freeman or D & S Homebuilders . . .", and through his Exchange Realty office, was to receive a 5% commission on all sales of property from the corporation or Mr. Freeman. D & S was organized as a corporation until November 21, 1984, when it was involuntarily dissolved for failure to file an annual report. Though the corporation was formed and a Corporate Charter issued, and this action was taken at the request of the Respondent, the corporation was formed in the attorney's name. Neither Respondent nor the Freemans ever officially took over as officers or directors. In short, the corporation while legally born, never breathed. At no time during its life and during the period relative to the allegations contained in the Administrative Complaint herein, did the Respondent qualify the corporation with the Florida Construction Industry Licensing Board. In addition to sending the letter to the attorney requesting that the corporation be established, Mr. Stone, on November 1, 1983, entered into a handwritten agreement with Mr. Freeman, also drawn by Ms. Via, which called for the use of his license: for Freeman to pay Respondent an additional $500.00 for the use of the license on each job over $5,0000.00 and for Freeman to "be solely responsible for anything that might arise against S. A. Stone's license." The first payment was to be made on December 1, 1983, and the agreement was to last through November 1, 1984. Stone never got any financial benefit from his relationship with Freeman. The agreement mentioned above was entered into at the behest of the then Chief of Police in Chiefland, Mr. Underwood, who requested that Respondent do anything he could to keep Freeman, who was then under investigation for other misconduct in the area. Mr. Underwood corroborates this. Pursuant to this request, when Respondent suggested an arrangement with Freeman, Freeman insisted that the agreement be in writing. Stone contends that at no time did he ever intend for the agreement to be permanent nor did he ever intend to make any money out of it. He says he knew it was illegal and he entered it solely because of the request from the police. He contends, and there is no evidence to contradict his contention, that at no time did he ever receive any money from Freeman as a result of this agreement nor from the formation of D & S. On July 26, 1983, Respondent executed an authorization for Dennis Freeman to act as his authorized agent to pull permits on his behalf at the Levy County Building Department. No mention was made on this form of D & S Homebuilders, Inc. The form was prepared by Mrs. Nancy Gilbert, the administrative assistant to Mr. Davis, the Levy County Building Official. At the time in question, Mr. Stone had introduced Mr. Freeman, his agent, to pull permits and Ms. Gilbert prepared the document to do what Mr. Stone wanted. The document is written in plural terms for repeated uses. Mr. Stone contends that his intention at the time was for it to be used for a single operation and that he failed to notice the erroneous pluralism, but other evidence of record disproves this contention. While it is not the policy of the Building Office to prepare these authorizations for contractors, it is a normal practice in Levy County and other counties throughout the State to allow agents to pull permits on the license of their prime contractor or employer as was done here. There is no evidence that the Bell job, which was for the most part accomplished by Respondent, was not satisfactory. Here, the work progressed smoothly and was properly completed, but based on his dissatisfaction with Freeman's performance during this job, he indicated to Freeman that there would be no further relationship between them. Nonetheless, the authorization was not revoked and Stone signed the permit application for the Reagan house as seen below. Without that authorization, the Building Office would not have allowed Freeman to obtain any of the building permits utilized for the other construction projects referenced in the Administrative Complaint. In July 1983, the Fumeas entered into a handwritten contract with Freeman, drafted by Kristina Freeman for the construction of a house for Bertha Reagan, Mrs. Fumea's mother. The contract had a price of $24,000.00. The Fumeas were to receive $10,000.00 for their land on which the house was to be built and Freeman was to receive a $14,000.00 loan from Mrs. Reagan for materials to build the house in question. When the house was sold, the initial $24,000.00 was to be returned to Mrs. Reagan. Any profit was to be divided 40% to Mrs. Reagan, 40% to the Freemans, and 20% to the Fumeas. The contract also called for the construction of a second house upon completion of the first. By check, dated June 9, 1983, Mrs. Reagan provided Freeman with the $14,000.00 to be secured by a second mortgage on the property executed by both Freemans in favor of Bertha Reagan. Thereafter, on August 24, 1983, Respondent, acting for D & S and S. A. Stone and Dennis Freeman, applied for a construction permit to build a residence for Mrs. Reagan as called for. In support of that application, Mr. Stone also furnished an affidavit to the effect that he was the qualifying contractor for residential building for D & S in Levy County. That same day, a building permit was issued to D & S, S. A. Stone, and Dennis Freeman for construction of the house in question. Somewhat later, in August or September, 1983, Freeman began construction of the house. During their negotiations, Freeman had indicated that Respondent was his associate. Nonetheless, it was Freeman who did all the work but in September or October 1983, he quit work on the project. At that point the foundation, the floor, and the 2 x 4 framing was in. No roof, no plumbing, and no electrical work had been installed. Mr. Fumea kept calling Freeman who repeatedly promised to finish work on the property by December 1983, but never did. The house was finally completed by another builder, David Allen, in 1984, for $21,000.00 additional. Allen was unable to complete the work started by Freeman and had to tear it down. Only the original footing was utilized. Neither Mr. or Mrs. Fumea ever dealt with or saw Stone, nor at any time during the period of difficulty with the construction was any attempt made to contact him. The reasoning was that even though Freeman had indicated Stone was the "S" in D & S before the work started, they did not believe Stone had anything to do with the contract. The Fumea's knowledge of Respondent's relationship with D & S was based solely on Freeman's representations. They never dealt with Stone, never saw him at the job, nor did they complain to him when the work was not completed even though Chiefland is a small town and it would be easy to contact him. Somewhat later, on September 7, 1983, Michael (Dennis) and Kristina Freeman entered into a contract with Herman R. and Verenia A. Matthews for the construction of a home in Levy County for a contract price of approximately $21,061.45 which included $17,061.45 which was then owed to the Matthews by Freeman. Freeman was to build them a house on a lot they owned across from their residence for an investment. The $17,641.00 was made up of several loans by the Matthews to Freeman. At this time, the Matthews did not know of D & S. The loans in question had been granted on the basis of a personal friendship between the Matthews and Freeman. At the time, the Matthews were in Michigan and the loans were not secured nor was interest involved. In addition to the $17,061.45 already advanced, the Matthews were to pay an additional $4,000.00 and any sums received from the cutting of timber on the property was to also be paid to Freeman. On or about October 12, 1983, Michael Freeman, acting for D & S, applied for a construction permit to build the Matthews' house. Attached to the application was an undated, unnotarized affidavit signed by Michael Freeman indicating he was qualifying contractor for D & S. Pursuant to the application, that same day, a building permit for the construction in question, was issued. Actually, construction had started without the benefit of a permit in early September, 1983. On September 9, 1983, the Matthews gave Freeman a $1,000.00 check with second and third payments of $1,000.00 each being paid on September 22, 1983. On October 17, 1983, Mrs. Matthews gave Freeman a check for $7,000.00 of which $1,000.00 was the remaining amount due on the $4,000.00 balance and $6,000.00 was an unsecured loan. This loan was repaid immediately with an exchange check, post-dated to October 24, 1983, in the amount of $6,000.00 drawn on the account of D & S by Michael Freeman. When the Matthews ultimately deposited the check, however, it was dishonored due to insufficient funds and the $6,000.00 loan was never repaid. The Matthews first found out about D & S Homebuilders, Inc. when the Freemans in late August or September, 1983, indicated they had incorporated. Mrs. Matthews had never met the Respondent nor been aware that Respondent might be involved in the construction. Freeman had represented himself as a licensed contractor and had told the Matthews that he had rented space in Respondent's office. At no time, however, did he say that Respondent was involved in the business. On November 14, 1983, Mrs. Matthews gave a check in the amount of $7,000.00 to Kristina Freeman, as a loan to D & S since she had been told that the company was haying trouble paying its bills. This loan was never repaid. By this time, the Matthews knew well that Freeman was in financial difficulties and did not have any money, so they did not ask for their loan back. In addition, on December 2, 1983, Mrs. Matthews gave Michael Freeman a check for $850.00 as a loan for payroll and on December 12, 1983, gave him a check for an additional $200.00 as a loan to assist him to buy property on which he was to build a house for Mr. Piperski. Neither of these latter two loans were ever repaid. The house to be built for the Matthews was never completed by Freeman or D & S. Work stopped sometime in November 1983. After Freeman went to jail in January 1984, Mrs. Matthews had it finished by someone else. The home was completed by this second contractor in April 1984 and the Matthews now live in it. In addition to the amounts set out above, the Matthews also paid an additional $7,034.00 for materials and $6,590.00 for labor to complete the property. On top of this, they also paid $1,200.00 to RocLen Refrigeration for a dishonored check issued by Kris Freeman on the D & S account in January 1984 for the heating and air conditioning system. They also paid off a claim of lien in the amount of approximately $3,600.00 filed by McCoy Building Supply Center for building materials ordered by D & S for the property; approximately $240.00 to Arrington Tru-Value Hardware for miscellaneous building materials ordered by D & S for the property; and approximately $875.00 to satisfy a claim of lien filed by Keller Building Products of Ocala, based on a contract with D & S for miscellaneous building materials on the property. Mrs. Matthews did not contact Respondent about the house because as far as she was concerned, he had nothing to do with it. Freeman had told her that D & S was owned by Freeman and his wife, most of the checks she gave to D & S were made out to Freeman and endorsed by either Freeman or his wife. All cash paid into the D & S account was done through dealings with one or the other of the Freemans, and she never dealt at all with Stone. On November 25, 1983, Michael Freeman, acting for D & S, submitted a proposal to Charles Treis for the construction of a home on property in Chiefland, Florida, for a price of $14,000.00 plus a travel trailer valued at $3,000.00. On the same day, Freeman and Treis entered a standard form agreement for the construction of this home by D & S for the amount stated, payments to be made of $5,000.00 as of signing $5,000.00 upon "rough in," and $4,000.00 plus the travel trailer upon completion of specified work. Construction was to begin on November 28, 1983, and was to be completed within 60 days. The contractor was to complete the house except for painting and staining, heating and air conditioning, floor covering, and appliances. Interior trim and doors were to be supplied by the contractor for, installation by the owner. That same day, Mr. Treis gave a check in the amount of $5,000.00 to Michael Freeman as the first payment on account in accordance with the terms of the contract. This contract was amended on January 10, 1984 when Freeman agreed to install floor covering, build cabinets for the kitchen, install interior trim and doors, and paint and stain. the interior and exterior. He was also to supply wood ceiling in the living room area and kitchen and in return therefor, was to be paid $2,000.00 plus a travel trailer. On December 20, 1983, Michael Freeman, on behalf of D & S, applied for a construction permit to build the Treis house and that same day a building permit was issued to D & S. On January 6, 1984, Mr. Treis gave two checks to Mr. Freeman, one for $1,000.00 and one for $6,000.00 additional draws against the contract price. In mid-January 1984, after the foundation was poured and the interior and exterior walls were partially erected, D & S ceased all construction activity because Freeman had been arrested and jailed in Marion County. At this point, the roof had not been installed nor were doors and windows in place. No one from D & S ever returned to complete his own construction. On January 16, 1984, Mr. Treis paid Suwannee Valley Precast Company in the amount of $540.00 for a 900 gallon septic tank ordered by Mike Freeman at D & S. This bill was supposed to have been paid out of the first draw Treis gave Freeman but was not. To avoid a lien being filed against his property, Mr. Treis paid off the amount in question. Mr. Treis also paid $710.33 to Sunshine Concrete and Building Supply for materials ordered by D & S and $189.00 to Lindsey Brothers Construction for labor for laying the foundation walls, also procured by Freeman for D & S. In addition, Mr. Treis paid Harcan Lumber the amount of $4,500.00 for bad checks that Michael Freeman had written in payment for materials to go into the Treis property. As a result of all these additional debts, Mr. Treis was required to sell the property to pay off the creditors not paid by D & S. Mr. Stone was not present at any time during the transactions described regarding Mr. Treis, and Freeman made no mention of him. In fact, Mr. Treis did not know anything about Mr. Stone. It was only after Mr. Treis found out that Freeman was in jail that he had any contact with Stone. Toward the end of January 1984, when he found out that the "S" in D & S was Respondent, Treis and a friend went to Stone's office to find out what Stone intended to do about the property. Stone indicated he was not responsible for anything that Freeman did and that he would not honor the contract that had been entered into with D & S. At some time prior to November 26, 1983, in response to an advertisement placed in the Chiefland newspaper by D & S, Howard Robinson contacted Freeman to obtain an estimate for the construction of a home in Levy County. During the contract negotiations, Freeman provided Robinson with a D & S business card which bears only Freeman's name. Robinson is a resident of Largo but owns property in Levy County. On November 26, 1983, Mr. and Mrs. Robinson, entered into a contract with D & S which was signed by Michael Freeman, for the construction of a home for the price of $16,900.00. Payments were to be made one-third upon acceptance of the contract, one-third upon "rough-in" inspection, and one a third upon completion. The owner was to install floor coverings, heating and air-conditioning and appliances, and the contractor was to provide a one year warranty on construction. Construction was to begin by November 29 and the house was to be completed within 60 days. Three days later on November 29, 1983, Mrs. Robinson issued a check in the amount of $5,633.33 to D & S Homebuilders, Inc. as the first payment for the construction of their home. This check was endorsed by Michael Freeman for D & S. It should be noted here that, as previously, the business card given to Mr. Robinson by Freeman at the time of their first meeting reflects only Freeman's name, not that of Respondent. After the contract was executed, Mr. Robinson returned to Largo and did not come back to Levy County until January 1984. On December 22, 1983, Mr. Freeman came to Largo to see the Robinsons for purpose of securing the second draw. At that time, he indicated the foundation and slab had been poured and that walls erected and the roof trusses were to be installed the following day. Based on these representations, Mrs. Robinson issued another check for $5,633.33 to Freeman for the second draw under the contract even though the second draw was not due until after erection of the roof trusses. As inducement to pay prior to the time called for in the contract, Freeman agreed to amend the contract to provide air conditioning and heating, furnish the floor covering, and build a 10 x 12 foot pump house. After paying these additional sums, Mr. Robinson found out that construction on his house had not been started even though Freeman had indicated that it had. Therefore, in January 1984, Mr. Robinson made his first trip back to Chiefland since the signing of the contract to visit the construction site and discovered that the only work accomplished had been the digging of a footer. On or about January 10, 1984, Freeman, on behalf of D & S, applied for a building permit to construct the property in question and this permit was issued that same day. The only construction accomplished on Robinson's property was an oversized footer, approximately three feet wide and four or five feet deep, out of which the steel company had already taken the steel originally installed. Even after this however, Mr. Robinson did not contact Respondent because his dealings had always been with Freeman and he had never seen nor talked to Stone. Neither Stone or any of his agents or employees has ever contacted Mr. Robinson concerning either completing the construction or repaying the money paid under the contract. The only thing Mr. Robinson has ever been reimbursed with was a $300.00 payment from the County when Mr. Freeman was on a work- release program while in jail. In November 1983, Mitchell Piperski saw an ad in the paper for a home built by Mr. Freeman. This ad was in the name of D & S Builders and Mr. Piperski contacted Freeman at the phone number in the ad. Freeman thereafter came to Piperski's house and they discussed the possible construction of a home for the Piperskis. As a result of these discussions, Mr. Piperski, on December 19, 1983, entered into a contract with D & S signed by Michael and Kris Freeman for the construction of a home in Chiefland for a contract price of $16,500.00. Since Mr. Piperski did not have a lot on which to build the house, Freeman took him a see a lot which he said he, Freeman, owned. The lot in question was a five acre corner and when Piperski said he did not need so much land, Freeman said he would keep one half. Since, however, the two parties could not agree on the property, Piperski purchased a lot from someone else. A short time thereafter, the Freemans came to the Piperskis and indicated they would be in financial difficulty if the Piperskis did not buy their property and as a result, the Piperskis agreed to allow Freeman to build the house on the property which, by warranty deed on December 19, 1983, Freeman conveyed to the Piperskis. At closing Freeman was paid $5,000.00 called for upon acceptance of the contract, and $12,500.00 for the lot. During the negotiations, Freeman had told Mr. Piperski that there were three people involved in D & S. These three were Freeman, his wife, Kris, and someone else, undisclosed, who was in the real estate business. Mr. Piperski had known Stone from the lodge to which they both belonged but he had no idea that Stone was the "S" in D & S. No work on the construction of the Piperski house was ever accomplished. When Piperski called the building department, he was told that Freeman could no longer build homes because Mr. Stone had pulled the authorization for him to use Stone's license. This disclosure was made to Mr. Piperski on January 8, 1984. Prior to that date and all through the negotiations, he had no idea that Stone was involved in the transaction. That afternoon, Mr. Piperski went to a lawyer about the situation and the lawyer called Stone. When Piperski asked Stone for his $5,000.00 back, Mr. Stone said he would allow Freeman to use his license to complete the house. Notwithstanding this promise by Stone, Freeman never made any effort to secure a permit to begin construction. Mr; Piperski did not contact Stone again after that one instance because he felt Stone knew what the situation was and what had to be done. Stone, on the other hand, did not contact Piperski either, nor did Freeman, and at no time was Piperski reimbursed the $5,000.00 deposit he made under the terms of the contract. On January 9, 1984, Stone wrote to Mr. A1 Simmons, the attorney who formed the corporation known as D & S Homebuilders, Inc. In this letter Stone recalled that Simmons had formed the corporation in which Freeman was President, his wife was Secretary/Treasurer, and he, Respondent, was Vice-President. Stone also cited that there was a communications gap between Freeman and himself and as a result, asked how he could be removed as an officer of the corporation. Stone indicated that he was "going to notify the County that I am no longer going to authorize the use of my license as D & S Homes." At the bottom of the letter, he states that it constitutes official notification to Freeman and to Mr. Davis, the building official, that his license is no longer to be used under D & S Homes. By this letter, Mr. Stone recognized that as of January 9, 1984, he was still a part of D & S Homes and was aware of the use of his license by D & S under the authorization given earlier in the year. It has already been found that in November 1983, Stone and Freeman entered into an agreement for Freeman to pay Stone for the use of his license by D & S Homes. It is also noted, however, that on January 5, 1984, approximately two months later, Mr. Stone wrote to Freeman indicating his dissatisfaction with the way Freeman was managing the company and because of Freeman's failure to communicate with Stone in response to inquiry. In this letter, he makes it very clear to Freeman that if Freeman does not keep in touch, he will terminate the relationship that he has with D & S. By so doing, Stone puts to rest any question that he was still a part of D & S and agreed to Freeman's using his license for construction by that firm as late as January 5, 1984 - well after the contracts described above were entered into by Freeman. D & S had a checking account with the Bank of Florida in Chiefland on which both Respondent and Freeman were authorized to write checks. In October 1983, Mr. Freeman drafted a check to Exchange Realty, which is owned by Respondent, in the amount of $500.00 which bears the notion, "commission on burnout." This check was deposited to the account of Exchange Realty. The handwriting on the endorsement appears to be that of Penny Via as does the name of the payee. On October 24, 1983, Mr. Stone wrote a check, apparently on a counter check payable to Exchange Realty in the amount of $500.00. Again, this check is endorsed for deposit to the account of Exchange Realty and not only the endorsement but also the check itself, with the exception of the signature, appears to be drawn in the handwriting of Ms. Via. While offered to show Respondent's receipt of benefit from his association with D & S, this evidence does not do so. Respondent knew of this account, nonetheless, and agreed to be a signatory on it so that he could work on the account when Freeman was out of town. After a short period, however, he took his name off the account though he cannot remember when that was. Respondent's contention that he had little if any connection with the actual construction work accomplished by Freeman under the D & S banner is supported by the testimony of Earl Jones, a plumber, who did the plumbing work on some of the houses constructed by Freeman during the Summer of 1983. Jones was hired by Freeman who, at the time, advised him that he was a general contractor and owned the business. Freeman admitted that he was a friend of the Respondent but during the whole period of his association with D & S, Jones never dealt with Stone and he feels that his employer was Freeman, not Stone. During the period of their association, Jones had no contact at all with Respondent. All bills for services rendered were sent directly to Freeman. Andrew Sension, an electrical contractor, met Freeman when Freeman solicited bids for the drawing of house plans. Thereafter, Sension drew five house plans for Freeman through D & S and also did some electrical work. At that time, Freeman indicated that he and his wife owned D & S and throughout their relationship, Sension assumed that Freeman was licensed. He has, however, worked for Respondent but never any project where Freeman and Respondent were involved together. To his knowledge, Respondent had a good reputation in the County as a contractor. Respondent has lived in Chiefland for approximately 15 years and is licensed as a contractor in both Florida and Virginia where he operated as a general contractor for 10 or 11 years before coming to Florida. In addition, he worked as a contractor in Ft. Lauderdale for 5 or 6 years and in all his construction history, never had any disciplinary action taken against him. Stone met Freeman some time in the middle of 1983 when Freeman came to his real estate office to buy a lot to build on. Later on, Freeman came back and said his brother an attorney, had suggested he contact Stone to form a corporation to build homes. At the time, Freeman, whose real name was Michael, was using the name Dennis Freeman, actually the name of his brother. When Stone checked Freeman's reputation out with the credit bureau, he checked the name, Dennis Freeman, and found that there was no adverse comments recorded. He did not know at the time that he was checking the record of a different individual. Nonetheless, satisfied with the results of his inquiry, and willing to go into the proposition suggested by Freeman, the parties made an appointment with attorney Simmons to form a corporation. Stone contends, and Simmons concurs, that though the corporation was formed, it never became operative because while formed in the name of Simmons for incorporation purposes, the transfer of authority to the true officers, Stone, Freeman, and Freeman's wife, was never accomplished. Were this all there were to it, there would be little difficulty in accepting Stone's exculpatory rationale. The fact remains, however, that his conduct and communications with his attorney in January 1984, several months after the corporation was formed, clearly reveals that though the official transfer of names never took place, he was well aware that D & S was active, that Freeman was building homes under the D & S banner, and that Freeman was using his, Stone's license, to do so with Stone's permission. The letter of January 9, 1984, to the lawyer clearly defeats Stone's contention that he felt the authorization for Freeman to pull permits was a one time proposition. If that were the case, he would not have indicated in these later communications that he was aware of what was going on and wished it stopped as of that time. There is no doubt that Respondent never met Mrs. Reagan, the Fumeas, the Matthews, the Robinsons, Mr. Treis, or the Piperskis in the capacity of a contractor. None of the people ever indicated that they dealt with Stone. Respondent admits that his contractor's license was withdrawn by the County but contends that this action was taken at a meeting to which he was not invited and did not attend. He did pot know of the action taken, he claims, until he read it in the newspaper. There is no evidence to contradict this. He firmly believes that his problem with the County is the direct result of the fact that he failed to contribute Mr. Davis' church when asked-to do so at the time he executed the general authorization for Freeman to use his license. Whether Mr. Davis is the complainant and the cause of the disciplinary action being taken here is immaterial however, and in any case, there is no evidence to support Respondent's contention. As for Freeman, on January 30, 1984, he entered a guilty plea to one count of a third degree felony by failing to redeliver and one count of a third degree felony by forgery and committing grand theft. Thereafter, he was found guilty of the charges and placed on probation for two years.

Recommendation Based on the foregoing Findings Of Fact and Conclusions Of Law, it is, therefore RECOMMENDED that the Administrative Complaint in DOAH Case No. 85-1468 be dismissed. It is further recommended that based on the violations established in DOAH Case No. 85-0690, Respondent's license as a registered general contractor be suspended for six months and that thereafter Respondent be placed on probation for a period of three years. RECOMMENDED in Tallahassee, Florida this 16th day of January, 1986. ARNOLD H. POLLOCK, Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 16th day of January, 1986. COPIES FURNISHED W. Douglas Beason, Esquire 130 N. Monroe Street Tallahassee, Florida 32301 Jeffrey J. Fitos, Esquire 1 East Silver Springs Blvd. Ocala, Florida 32670 James Linnan Executive Director Construction Industry Licensing Board P. O. Box 2, Jacksonville, Florida Fred Roche Secretary Department of Professional Regulation 130 N. Monroe Street Tallahassee, Florida 32301 APPENDIX The following constitutes my specific rulings pursuant to Section 120.57(2), Florida Statutes, on all Proposed Findings of Fact submitted by parties to this case. RULINGS ON PETITIONER'S SUBMISSION 1. Adopted in Findings of Fact 1 and 3. 2 · Adopted in Finding of Fact 1. Adopted in substance in Finding of Fact 7. Sentence 1 through 3 are irrelevant. Sentence 4 is accepted as to it relates to the letter being prepared by the building department but rejected as to this being done at Respondent's request. Adopted in Finding of Fact 2. Adopted in Finding of Fact 2. Adopted in Finding of Fact 2. Adopted in Finding of Fact 2. Adopted in Finding of Fact 2. 1O. Adopted in Finding of Fact 4. 11. Adopted in Finding of Fact 4. 12. Adopted in Finding of Fact 4. 13. Adopted in Finding of Fact 4. 14. Adopted in Finding of Fact 2. 15. Adopted in Finding of Fact 10 16. Adopted in Finding of Fact 10. Adopted in Finding of Fact 12, except for the first sentence which is irrelevant. Adopted in Finding of Fact 11. Adopted in Finding of Fact 12. Adopted in Finding of Fact 12, except for the last sentence which implied Freeman signed as affiant when in fact he signed as a witness. Adopted in Finding of Fact 12. Adopted in Finding of Fact 15. Sentence 1 rejected as contra to the evidence. Sentence 2 adopted in Finding of Fact 13. Adopted in Finding of Fact 14. Rejected as irrelevant and misleading. There is no indication in the record that Respondent knew of this contract or that any demand for reimbursement was made upon him. Adopted in Finding of Fact 17. Adopted in Finding of Fact 17 and 22, except for sentences 3 & 4, which are rejected as irrelevant. Rejected as irrelevant and inaccurate. Rejected as irrelevant. Rejected as irrelevant. Rejected as irrelevant. Rejected as irrelevant. Adopted in Finding of Fact 19. Adopted in Finding of Fact 19. Adopted in Finding of Fact 20. Adopted in Finding of Fact 20. Adopted in Finding of Fact 24. Adopted in Finding of Fact 24. Adopted in Finding of Fact 24. Adopted in Finding of Fact 24. Adopted in Finding of Fact 24. Rejected as irrelevant. Adopted in Finding of Fact 24. Rejected as irrelevant. Adopted in Finding of Fact 24. Rejected as irrelevant. Adopted in Finding of Fact 24. Adopted in Finding of Fact 26. Adopted in Finding of Fact 26. Adopted in Finding of Fact 26. Adopted in Finding of Fact 28. Adopted in Finding of Fact 28. Adopted in Finding of Fact 29. Adopted in Finding of Fact 30. Adopted in Finding of Fact 30. Adopted in Finding of Fact 30. Adopted in Finding of Fact 30. Adopted in Finding of Fact 31. Adopted in Finding of Fact 32. Adopted in Finding of Fact 32. Adopted in Finding of Fact 35, except that November 6 in the proposal should be November 26. Adopted in Finding of Fact 35. Adopted in Finding of Fact 35. Adopted in Finding of Fact 34. Adopted in Finding of Fact 34 and 35. Adopted in Finding of Fact 36. Adopted in Finding of Fact 36. Adopted in Finding of Fact 36. Adopted in Finding of Fact 37. Adopted in Finding of Fact 38. Adopted in Finding of Fact 39. Adopted in Finding of Fact 41. Accepted but not adopted as irrelevant. Adopted in Finding of Fact 41. Adopted in Finding of Fact 43. Adopted n Finding of Fact 45 and 46, except that it was the building office that advised Piperski that Freeman did not have a permit, not Respondent. Adopted in Finding of Fact 46. Adopted in Finding of Fact 62. Adopted in Finding of Fact 62. RULINGS ON RESPONDENT'S SUBMISSION Adopted in Finding of Fact 1. Sentence 1 through 3 adopted in Finding of Fact 7. Sentence 4 rejected as contra to the weight of the evidence. Sentence 5 and 6 adopted in Finding of Fact 8. Sentences 1 and 2 adopted in Finding of Fact 9. Sentences 3 through 5 rejected as contra to the weight of the evidence. Sentences 1 and 2 adopted in Findings of Fact 26- 29. Sentence 3 rejected as not being a Finding of Fact but a Conclusion of Law. Sentence 1 rejected as contra to the evidence. Mrs. Reagan did not sign the contract. Mrs. Fumea did. Sentence 2 adopted in Finding of Fact 15. Sentence 3 adopted in Finding of Fact 12. Sentence 4 adopted in general. Sentences 1 and 2 adopted in Finding of Fact 17, 35 and 41. Sentence 3 rejected by contra to the weight of the evidence. Sentence 4 is rejected as irrelevant. Sentence 5 is ejected as contra to the weight of the evidence in that he failed to show the proper concern for the use of his licenses. Rejected as irrelevant to the issues herein. 8 and 9. Adopted in Finding of Fact 4. Adopted in Finding of Fact 62. Adopted as a general fact. Adopted in Finding of Fact 61. Adopted in Findings of Fact 52-55.

Florida Laws (3) 120.57489.119489.129
# 6
CONSTRUCTION INDUSTRY LICENSING BOARD vs. DOMINIC D`ALEXANDER, 82-002858 (1982)
Division of Administrative Hearings, Florida Number: 82-002858 Latest Update: Apr. 24, 1984

Findings Of Fact At all times pertinent to the issues in this hearing, Respondent was a licensed building contractor, whose license is No. CBC014467. His certification as an individual by the Florida Construction Industry Licensing Board was initially dated August 16, 1979. In February, 1981, he requested his second license be registered qualifying Jeff Webb Homes, Inc.; and in September, 1982, the license was changed from Jeff Webb Homes, Inc., to Intervest Construction, Inc. On April 23, 1981, Anna Ray McClellan contracted with Regency Central, Inc., for the construction and purchase of a single family residence located at Lot 5, Devonwood Subdivision, Volusia County, Florida. David L. Martin is president of Regency Central, Inc., and neither he nor Regency Central, Inc., are or have ever been registered or certified by the Florida Construction Industry Licensing Board to engage in the business of contracting in the State of Florida. On June 5, 1981, Respondent applied for a residential construction permit for Lot 5, Devonwood Subdivision, listing Regency Central, Inc., as the owner of the property, and himself, with License No. CBC014467, as the contractor. Actual contracting for the construction at Lot 5, Devonwood Subdivision, was accomplished by Regency Central, Inc. Three separate addenda to the construction/purchase contract calling for modifications to the specifications of construction were signed, not by Respondent, but by David L. Martin for Regency Central, Inc. Major subcontracts on the construction including plumbing, electrical, and heating and air conditioning, were entered into between the subcontractors and Regency Central, Inc., and not Respondent. Subcontractors looked to Regency Central for payment, and not to Respondent. A claim of lien filed on ,September 9, 1981, for central air conditioning and heating work on the property in question reflects the work was done under contract with Regency Central, Inc., David L. Martin, President. During construction of the house, Ms. McClellan visited the construction site several times a week at different hours of the day. She recalls seeing Respondent in the area only twice, the first time being the day the contract for purchase was signed, and the second being the day the slab was poured. Her dealings at the site were with the supervisor, Dan Haley, who indicated to her that he worked for Regency Central, Inc. Respondent was interviewed by Philip T. Hundemann, an investigator for the Florida Department of Professional Regulation, in late March, 1982, at Respondent's home. During the course of the interview, Respondent admitted that he met David L. Martin when Martin rented office space in a building that Respondent had constructed and owned. During the course of conversations, Martin suggested to Respondent that he, Martin, had ninety-nine lots available for building and that if Respondent would pull the construction permit for the Lot 5 project, he would get a contract from Martin to build on the other ninety- nine lots. Respondent admitted that he did not supervise the contract, that he did pull the permit, and that he was in violation of the law and had prostituted his license. His defense was, at that time, that he was hungry to get a big construction contract with Martin. Though after he pulled the permits his agreement was to work on the site for the rate of ten dollars per day with the supervisor, Mr. Haley, he was there only infrequently. Respondent now modifies the admissions made previously to Mr. Hundemann. He now states he was heavily involved with the construction project on a daily basis either in his office or on the construction site, not only as a contractor, but also as sales broker. While he admits what he did was in violation of the law and was foolish, he did not intend to break the law. Respondent's involvement with Ms. McClellan's project was not as contractor as indicated in the permit he pulled. He had very little contact with that project until Martin abandoned the project and left the area.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED: That Respondent's, Dominic D'Alexander's, license as a certified building contractor be suspended for one year, but that, upon the payment of a $500 administrative fine, the execution of the suspension be deferred for a period of three years, with provision for automatic recission. RECOMMENDED this 21st day of March, 1983, in Tallahassee, Florida. ARNOLD H. POLLOCK, Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 21st day of March, 1983. COPIES FURNISHED: Charles F. Tunnicliff, Esquire Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 Mr. Dominic D'Alexander Post Office Box 4580 South Daytona, Florida 32021 Mr. James Linnan Executive Director Construction Industry Licensing Board Department of Professional Regulation Post Office Box 2 Jacksonville, Florida 32201 Mr. Fred Roche Secretary Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301

Florida Laws (7) 120.57489.101489.111489.117489.119489.129489.131
# 7
CONSTRUCTION INDUSTRY LICENSING BOARD vs. STEPHEN J. BOROVINA, 77-001442 (1977)
Division of Administrative Hearings, Florida Number: 77-001442 Latest Update: Feb. 21, 1978

The Issue The Florida Construction Industry Licensing Board, Petitioner, seeks to revoke the registered contractor's license of Stephen J. Borovina, Respondent, based on allegations, which will be set forth in detail hereafter, that he engaged in conduct violative of Chapter 468, Florida Statutes. The issue presented is whether or not the Respondent aided or abetted and/or knowingly combined or conspired with Mr. Howard North, an uncertified or unregistered contractor, to evade the provisions of Chapter 468.112(2)(b), and (c), Florida Statutes, by allowing North to use his certificate of registration without having any active participation in the operations, management, or control of North's operations. Based on the testimony adduced during the hearing and the exhibits received into evidence, I make the following:

Findings Of Fact The Respondent is a certified general contractor who holds license no. CGC007016, which is current and active. On or about July 25, 1976, Mr. and Mrs. Julius Csobor entered into a contract with Mr. and Mrs. Howard North for the construction of a home in Martin County, Florida, for a total price of $35,990. Neither Mr. or Mrs. North are certified or registered contractors in the State of Florida. (Petitioner's Composite Exhibit #2). Respondent applied for and was issued a permit by the Martin County Building Department to construct a residence for the Csobors at the same address stipulated in the contract between the Csobors and the Norths, i.e., Northwest 16th Street, Palm Lake Park, Florida. (Petitioner's Composite Exhibit #1). Howard North, a licensed masonry contractor for approximately nine (9) years was contacted by the Csobors through a sales representative from a local real estate firm. It appears from the evidence that North had previously constructed a "spec" house which the local realtor had sold and thus put the Csobors in contact with Mr. North when they were shown the "spec" house built by North. Evidence reveals that North contacted Borovina who agreed to pull the permit "if he could get some work from the job and could supervise the project". Having reached an agreement on this point, North purchased the lot to build the home for the Csobors and he orally contracted with the Respondent to, among other things, pull the permit, supervise construction, layout the home and do trim and carpentry work. North paid Respondent approximately $200 to layout the home for the Csobors. By the time that North had poured the slab and erected the subfloor, the Csobors became dissatisfied with his (North's) work and demanded that he leave the project. According to North, Respondent checked the progress of construction periodically. Prior to this hearing, the Csobors had never dealt with Respondent in any manner whatsoever. According to Csobor, North held himself out as a reputable building contractor. A contractor is defined in relevant part as any person who, for compensation, undertakes to, or submits a bid to, or does himself or by others, construct, repair, etc. . . . real estate for others. . . Chapter 468.102(1), Florida Statutes. Applying this definition to the facts herein, it appears that the Respondent, at least in a literal sense, satisfied the requirements and obligations of a contractor, as defined in Chapter 468.102, Florida Statutes. Thus, he contracted with North to oversee and/or supervise the project for the Csobors which he fulfilled, according to the testimony of North. Said testimony was not refuted and thus I find that no effort was made by Respondent to evade any provision of Chapter 468, Florida Statutes. Accordingly, I shall recommend that the complaint filed herein be dismissed in its entirety.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is hereby recommended that the complaint filed herein be dismissed in its entirety. RECOMMENDED this 4th day of November, 1977, in Tallahassee, Florida. JAMES E. BRADWELL Hearing Officer Division of Administrative Hearings 530 Carlton Building Tallahassee, Florida 32304 (904) 488-9675 COPIES FURNISHED: Barry S. Sinoff, Esquire 1010 Blackstone Building Jacksonville, Florida 32202 Stephen J. Borovina 2347 Southeast Monroe Street Stuart, Florida 33494 J. Hoskinson, Jr. Chief Investigator Florida Construction Industry Licensing Board Post Office Box 8621 Jacksonville, Florida 32211 ================================================================= AGENCY FINAL ORDER ================================================================= BEFORE THE FLORIDA CONSTRUCTION INDUSTRY LICENSING BOARD FLORIDA CONSTRUCTION INDUSTRY LICENSING BOARD, Petitioner, vs. DIVISION OF ADMINISTRATIVE HEARINGS, DOCKET NO. 77-1442 STEPHEN J. BOROVINA, CG C007016, 2347 S. E. Monroe Street, Stuart, Florida 33494, Respondent. / This cause came before the FLORIDA CONSTRUCTION INDUSTRY LICENSING BOARD at its regular meeting on February 10, 1978. Respondent was sent the Hearing Officer's findings and recommendations and was given at least 10 days to submit written exceptions to the recommended order. Respondent was notified of the meeting so that respondent or counsel might appear before the Board. Respondent did not appear The FLORIDA CONSTRUCTION INDUSTRY LICENSING BOARD on February 10, 1978, after reviewing a complete transcript of the Administrative Hearing, by motion duly made and seconded voted to revoke the certified general contractor's license of STEPHEN J. BOROVINA. It is therefore, ORDERED that the certification of respondent STEPHEN J. BOROVINA, Number CG C007016, be and is hereby revoked. Respondent is hereby notified that he has 30 days after the date of this final order to appeal pursuant to Chapter 120, Florida Statutes, and the Florida Appellate Rules. DATED this 13th day of February, 1978. FLORIDA CONSTRUCTION INDUSTRY LICENSING BOARD BY: JOHN HENRY JONES, President ================================================================= SECOND AGENCY FINAL ORDER ================================================================= BEFORE THE FLORIDA CONSTRUCTION INDUSTRY LICENSING BOARD STEPHEN J. BOROVINA, CG C007016, Respondent/Appellant, vs. DIVISION OF ADMINISTRATIVE HEARINGS, DOCKET NO. 77-1442 FLORIDA CONSTRUCTION INDUSTRY LICENSING BOARD, Petitioner/Appellee. / This cause came before the Florida Construction Industry Licensing Board at its regular meeting on August 3, 1979. The respondent was sent the Hearing Officer's findings and recommendations and was given at least 10 days to submit written exceptions to the recommended order. Respondent was notified of the meeting so that respondent or counsel might appear before the Board. Respondent did appear. The Florida Construction Industry Licensing Board, on August 3, 1979, after reviewing a complete transcript of the Administrative Hearing, by motion duly made and seconded, voted to revoke the certified general contractor's license of Stephen J. Borovina, No. CG C007016. On February 13, 1978, the certification of respondent, Stephen J. Borovina, No. CG C007016, was revoked by order of the Florida Construction Industry Licensing Board. On April 25, 1979, the District Court of Appeal of the State of Florida, Fourth District, in Case Number: 78-527, reversed the final order of the Florida Construction Industry Licensing Board. That Court remanded the above captioned case to the Board to further consider the matter and enter such order as it may be advised in conformity with Section 120.57(1)(b)(9), Florida Statutes (1977). In accordance with the decision of the Florida District Court of Appeal, Fourth District, the Board has reconsidered the above captioned matter and finds as follows: The Board rejects the recommended order as the agency's final order. The Board adopts the first paragraph of the hearing officer's finding of fact. The Board, however, rejects the findings of fact found in the second paragraph of the hearing officer's findings. The second paragraph states as follows: A contractor is defined in relevent(sic) part as any person who, for compensation, undertakes to, or submits a bid to, or does himself or by others, construct, repair, etc. real estate for others...Chapter 468.102(1), Florida Statutes. Applying this definition to the facts herein, it appears that the Respondent, at least in a literal sense, satisfied the requirements and obligations of a contractor, as defined in Chapter 468.102, Florida Statutes. Thus, he contracted with North to oversee and/or supervise the project for the Csobors which he fulfilled, according to the testimony of North. Said testimony was not refuted and thus I find that no effort was made by Respondent to evade any provision of Chapter 468, Florida Statutes. Accordingly, I shall recommend that the complaint filed herein be dismissed in its entirety. The findings of fact found in the above-quoted paragraph were not based upon competent substantial evidence. The competent substantial evidence supports a finding that the respondent, Stephen J. Borovina, did not supervise the project and that Borovina evaded the provisions of Chapter 468, Florida Statutes. The following evidence supports the Board's position: There was no written agreement entered into between Howard North and the respondent which indicated that the respondent was to supervise the construction of the Csobors' house (T- 14); It was conceded at the hearing that the only subcontractors or draftmen who worked on the Csobors' house were contracted solely by Howard North and they had no contract whatsoever with the respondent (T-19, 25); The respondent never advised or informed Mr. and Mrs. Csobor that he was the contractor on the job. (T-51); At all times during the act of construction of the house, Mr. and Mrs. Csobor were under the impression that Howard North was the contractor (T-44-51). It is, therefore, ORDERED: That the certification of respondent, Stephen J. Borovina, Number CG 0007016, be and is hereby revoked. Respondent is hereby notified that he has thirty (30) days after the date of the Final Order to appeal pursuant to Chapter 120, Florida Statutes, and the Florida Appellate Rules. Dated this 3rd day of August, 1979. FLORIDA CONSTRUCTION INDUSTRY LICENSING BOARD BY: JOHN HENRY JONES, President

Florida Laws (1) 120.57
# 8
CONSTRUCTION INDUSTRY LICENSING BOARD vs. JOHN W. FARRALL, 89-003291 (1989)
Division of Administrative Hearings, Florida Number: 89-003291 Latest Update: Feb. 15, 1990

Findings Of Fact At all times material to these proceedings, Respondent Farrall was licensed as a certified general contractor in Florida, and held license number CG C040234. In addition, the Respondent was licensed as a certified roofing contractor and held license number CC C024398. Mr. Farrall was the qualifying agent for Sunmaster Roofing Company. On May 25, 1987, Sunmaster Roofing Company entered into a contract with Clarence A. Miller and Emily Miller to reroof their residence in Naples, Florida. After the project was completed, Mr. and Mr. Miller filed a complaint with the Collier County Contractors' Licensing Board on December 7, 1987. Essentially, the complaint alleged as follows: 1) that the contractor abandoned the job without adequately completing construction; 2) that the roof materials were incorrectly installed; 3) that the contractor failed to obtain a building permit; and 4) that the contractor failed to adequately perform the contract due to his failure to correct faulty workmanship on the job. On December 11, 1987, copies of the complaint and a notice of hearing was sent to Respondent Farrall by certified mail to two different addresses. The items were promptly received at both locations. On January 15, 1988, the Respondent acknowledged that he was personally aware of the hearing scheduled for January 20, 1988. The Respondent requested a continuance until after January 29, 1988, because he had to attend to urgent family matters which required his presence in Canada. A continuance was not granted, and the hearing proceeded as scheduled. The Respondent was aware that the hearing was not continued prior to his departure for Canada. On January 20, 1988, a hearing was held, and the local board received evidence regarding the Miller complaint. As a result of the hearing, the local board found that the Respondent violated specific county ordinances in the following manner: by abandoning the job without legal excuse; disregarding or violating the building code by failing to obtain a building permit; and by failing to make good, faulty workmanship obviously performed in evasion of performance of the contract. The Respondent was disciplined by the Collier County Contractors' Licensing Board on January 20, 1988. His permit privileges were suspended in Collier County until the contractor makes restitution and appears before the Board for reinstatement. The Respondent was given fifteen days to appeal the decision. The Respondent personally received a copy of the disposition of the hearing by certified mail on January 28, 1988. An appeal was not taken of the decision.

Recommendation Based upon the foregoing, it is recommended that the charges set forth in the Administrative Complaint against the Respondent, John W. Farrall, in Case No. 89-3291 be DISMISSED. RECOMMENDED this 15th day of February, 1990, in Tallahassee, Leon County, Florida. VERONICA E. DONNELLY Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904)488-9675 Filed with the Clerk of the Division of Administrative Hearings this 15th day of February, 1990. APPENDIX TO RECOMMENDED ORDER, CASE NO. 89-3291 The proposed findings of fact set forth in Petitioner's proposed recommended order are addressed as follows: 1. Accepted. See HO #1. 2. Accepted. See HO #2. 3. Accepted. See HO #1 and #2 4. Accepted. See HO #8 and #9. 5. Accepted. See HO #8. Rejected. Irrelevant to the charges filed. Rejected. Irrelevant to the charges filed. The proposed findings of fact filed by the Respondent are addressed as follows: Accept the first two sentences. See HO #1. The rest of paragraph 1 is rejected as improper argument which is not based upon material evidence presented at hearing. Accepted. See HO #2. Rejected. The issue in this proceeding involves the discipline by the local government board and not the underlying facts upon which the board based its findings. Immaterial. 4. Rejected. Immaterial. See above. Rejected. Rejected. Rejected. Irrelevant. Irrelevant. Irrelevant. Rejected. Rejected. Irrelevant. Irrelevant. Rejected. Rejected. Rejected. Irrelevant. Irrelevant. Contrary to fact. See HO #6. Rejected. Rejected. Contrary to Irrelevant. fact. See HO #9. COPIES FURNISHED: Jack M. Larkin, Esquire 806 Jackson Street Tampa, Florida 33602 John W. Farrall 316-2 Tudor Drive Cape Coral, Florida 33904 Fred Seely, Executive Director Construction Industry Licensing Board 111 East Coastline Drive, Room 504 Jacksonville, Florida 32202 Kenneth E. Easley, Esquire General Counsel Department of Professional Regulation 1940 North Monroe, Suite 60 Tallahassee, Florida 32399-0792

Florida Laws (2) 120.57489.129
# 9

Can't find what you're looking for?

Post a free question on our public forum.
Ask a Question
Search for lawyers by practice areas.
Find a Lawyer