CONSTRUCTION INDUSTRY LICENSING BOARD vs. DAMIAN C. DAVIS, 83-001230 (1983)
Division of Administrative Hearings, Florida Number: 83-001230 Latest Update: Sep. 22, 1983

The Issue The issues presented are as follow: Did the Respondent allow his registration to be used by an unlicensed and unregistered person to evade the provisions of Chapter 489, Florida Statutes? Did the Respondent combine and conspire to allow his registration to be used by an unlicensed or unregistered person to evade the provisions of Chapter 489, Florida Statutes? Did the Respondent engage in contracting in a name other than set forth on his certificate? Did the Respondent engage in contracting in a name of a business entity without first qualifying that business entity with the Construction Industry Licensing Board? The parties submitted post hearing findings of fact in the form of a proposed recommended order and correspondence. To the extent that the proposed findings of fact have not been included in the factual findings in this order, they are specifically rejected as being irrelevant, not being based upon the most credible evidence, or not being a finding of fact.

Findings Of Fact The Respondent, Damian C. Davis, is a certified general contractor holding license number CG C007059 issued by the Construction Industry Licensing Board through the Department of Professional Regulation. On or about August 29, 1980, the Respondent obtained building permit number B 45383 from the City of Tampa Building Department for construction to be performed by George Lacey at 910 East Osborne Street, Tampa, Florida, the residence of Martha Smith George Lacey was at that time uncertified and unregistered and was the contractor in fact on the work to be done for Martha Smith at 910 East Osborne Street in Tampa. The Respondent arranged for all building inspections by inspectors of the City of Tampa and was on the building site when said inspections were conducted. All work was approved by building inspectors of the City of Tampa, and there were no code problems. Subsequent to the completion of the work by Lacey, the owner had a problem with a leak over a sliding glass door which Lacey had contracted to repair. When this matter was brought to the Respondent's attention by officials of the Tampa Building Department, the Respondent fixed the leak to the owner's complete satisfaction. The building permit obtained by the Respondent was issued in the Respondent's name. All work the Respondent performed was done in the Respondent's name. The Respondent and Lacey frequently worked together in joint ventures; however, this was not such a project.

Recommendation Having found the Respondent, Damian C. Davis, guilty of one count (one offense) of violating Sections 489.129(1)(e) and (f), Florida Statutes, and considering the Respondent's prompt action to satisfy the owner, it is recommended that the Respondent be given a letter of reprimand and assessed a civil penalty of $500. DONE and RECOMMENDED this 28th day of July, 1983, in Tallahassee, Leon County, Florida. STEPHEN F. DEAN, Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 28th day of July, 1983. COPIES FURNISHED: Stephanie A. Daniel, Esquire Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 Mr. Damian C Davis 1310 West Charter Street Tampa, Florida 33602 Frederick Roche, Secretary Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 James Linnan, Executive Director Construction Industry Licensing Board Post Office Box 2 Jacksonville, Florida 32202 ================================================================= AMENDMENT TO AGENCY FINAL ORDER ================================================================= STATE OF FLORIDA DEPARTMENT OF PROFESSIONAL REGULATION CONSTRUCTION INDUSTRY LICENSING BOARD DEPARTMENT OF PROFESSIONAL REGULATION, Petitioner, vs. CASE NO. 19791 DOAH CASE NO. 83-1230 DAMIAN C. DAVIS DAVIS & SEXTON, INC. 1302 West Sligh Avenue Tampa, Florida 33604, Respondent. / AMENDMENT TO FINAL ORDER The Final Order entered on September 22, 1983 in this cause incorrectly stated the fine imposed upon the Respondent. The correct amount is $250.00, to be paid within 30 days of this Order. DONE AND ORDERED in Jacksonville, Florida, this 30th day of November , 1983. FLORIDA CONSTRUCTION INDUSTRY LICENSING BOARD Henry Bachara, Chairman

Florida Laws (2) 120.57489.129
# 1
CONSTRUCTION INDUSTRY LICENSING BOARD vs. GEORGE W. BROWN, 84-001536 (1984)
Division of Administrative Hearings, Florida Number: 84-001536 Latest Update: Oct. 19, 1984

Findings Of Fact At all times relevant hereto, Respondent was licensed as a registered building contractor and as a registered general contractor. On or about August 4, 1982, Hoffman, representing B & B Constructors, Inc., contracted with Vernon Swanger to build an addition to the Swanger residence at 4412 West Lelia Avenue, Tampa, Florida. The contract price for the addition to the Swanger residence was $9,150. On August 4, 1982, Swanger made the initial payment to Hoffman of $3,000 by check on this contract. Prior to the signing of this contract, Hoffman had contacted Respondent, who agreed to pull the permit for this project and who signed a blank proposal which was subsequently completed, executed by Swanger and Hoffman on 4 August 1982, and became Exhibit 2 in these proceedings. On or about August 16, 1982, Respondent obtained a permit for the addition to the Swanger residence from the City of Tampa Building Department showing Respondent as the licensed contractor for the job. Although Respondent signed the stipulation of facts that "All or the greater part of the $3,000.00 which was the first or initial payment on the contract for the Swanger addition was diverted from the construction work," Hoffman testified in Exhibit 25 that he used the $3,000 to buy materials for the project and to pay his (Hoffman's) salary for his work on the project. Under the facts here presented, Hoffman was the only one who knew for what this $3,000 had been used. In his deposition Hoffman testified that an excessive number of rainy days resulted in cost overruns resulting in insufficient money to complete the project. At no time relevant hereto was Hoffman of B & B Constructors, Inc., licensed as a contractor by the State of Florida. Respondent visited the Swanger residence once or twice while the work was in process, but all materials were ordered by Hoffman, all subcontractors were hired by Hoffman or Swanger, Hoffman was the one supervising the project, and Respondent's participation and supervision was, at best, pro forma. At no time was Respondent the qualifying agent for B & B Constructors, Inc., although Respondent briefly considered acquiring B & B Constructors, Inc., at or about the time the contract with Swanger was negotiated. The City of Tampa, Florida, is the local government with jurisdiction of the area, which is part of Hillsborough County, where Respondent is qualified as a licensed contractor. On or about January 11, 1983, as the result of a complaint filed by Swanger, Respondent's license to practice contracting in Tampa was revoked by the City of Tampa Unified Construction Trades Board. Respondent testified that he paid for the permit pulled for the Swanger project out of his own pocket and was never reimbursed by Hoffman. However, in Exhibit 25, Hoffman testified that he gave Respondent $100 in cash with which to pull the permit and his agreement with Respondent was to pay Respondent 3 percent of the contract price to pull the permit as licensed contractor.

Recommendation From the foregoing it is concluded that Respondent is guilty of all charges alleged except violation of Section 489.129(1)(h), Florida Statutes, involving diversion of funds. In view of Respondent's voluntary inactivation of his license since June 1983 it is recommended that Respondent's license be suspended for six (6) months from the date the Construction Industry Licensing Board enters its final order in this case. DONE AND ENTERED this 19th day of October 1984 at Tallahassee, Florida. K. N. AYERS Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 19th day of October 1984. COPIES FURNISHED: James H. Gillis, Esquire Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 George W. Brown 11222 Russell Drive Seffner, Florida 33584 Fred M. Roche, Secretary Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 James Linnan, Executive Director Board of Construction Industry Licensing Board Department of Professional Regulation Post Office Box 2 Jacksonville, Florida 32202

Florida Laws (1) 489.129
# 3
CONSTRUCTION INDUSTRY LICENSING BOARD vs. DOUGLAS R. MCINTEE, 82-002843 (1982)
Division of Administrative Hearings, Florida Number: 82-002843 Latest Update: Jun. 01, 1984

Findings Of Fact These proceedings were set for final hearing by a Notice of Hearing dated July 8, 1983 addressed to the parties, including Respondent at 488 Esther Lane, Altamonte Springs, Florida, 33596. 2/ The Notice of Hearing was not returned to the Division of Administrative Hearings as undelivered. At the time and place noticed for the final hearing the Hearing Officer waited until 9:16 a.m., to commence the proceedings, which concluded at 11:08 a.m. At no time has the Respondent contacted the Hearing Officer concerning a continuance or explained his failure to appear as noticed. At all times material to this proceeding Mr. McIntee has been licensed as a certified building contractor under license number CB C015923. He was also the qualifying agent pursuant to Section 489.119, Florida Statutes, for Delco, Incorporated. At no time has he ever attempted to qualify or otherwise notify the Construction Industry Licensing Board that he intended to affiliate with or do business as Earth Shelter Corporation of Florida, Inc. On July 30, 1980 Earth Shelter Corporation of Florida, Inc. (Earth Shelter) entered into a contract with Mr. and Mrs. William Sweet to construct an earth shelter single family residence in Lake County, Florida. The estimated cost of the project was to be $57,000 and was guaranteed not to exceed $60,000. The contract was negotiated by Respondent acting as president of Earth Shelter. Mr. McIntee was the contractor who pulled the building permit on behalf of Earth Shelter. The project was financed by First Family Federal Savings and Loan Association of Eustis, Florida. In order to obtain payments from the Association, Respondent periodically executed affidavits which stated in part: Affiant says further that all the subcon- tractors, materialmen or any other persons performing labor and furnishing materials used in the construction of the building, or improvements to the premises or appur- tenances thereof, have been fully paid in- cluding all extras. As the result of executing these affidavits Respondent received draws totaling $49,079.26 on the dates of September 30, 1980, October 31, 1980, December 3, 1980, February 4, 1981 and July 10, 1981. These affidavits were false. At the time the affidavits were executed all the subcontractors had not been paid by Respondent. As an example, Frank Wagner Excavating, Inc. performed subcontracting services at the Sweet project on June 4 and 5, 1981 at a cost of $1,451. This was billed to Respondent on June 6, 1981. He sent Wagner Excavating a check dated June 6, 1981, in the amount of the invoice, but the check was returned to Wagner for lack of sufficient funds at Respondent's bank. Before Respondent's check bounced, but subsequent to invoicing the work done on June 4 and 5, 1981, Mr. Wagner performed additional earth moving work at the Sweet project on July 3, 8, 9 and 10, 1981. That work was invoiced on July 10, 1981 for $1,378.75. No attempt was made by Respondent to pay for the second invoice. Eventually Wagner Excavating was paid by Mr. Sweet personally and by an additional payment directly to Wagner Excavating by First Family Federal Savings and Loan Association in order to satisfy Wagner's lien. In order to protect himself, Wagner had filed a lien against the Sweet property on August 17, 1981. Because of structural defects in the construction of Mr. Sweet's home performed by Respondent, Mr. Sweet filed a complaint with the Lake County Board of Examiners against Respondent. Notice of that complaint was given to Respondent on August 18, 1981. He was informed that on September 1, 1981 the Lake County Board of Building Examiners would take testimony concerning the allegations contained in the complaint. Respondent was urged to attend the meeting and to be represented by counsel if he so desired. Mr. McIntee did appear at that meeting. An investigation of the complaint followed. Respondent was subsequently noticed for a second meeting of the Board of Examiners to be held on October 6, 1981 concerning the Sweet complaint, but he failed to appear. At that time the results of the investigation were reviewed and the Lake County Board of Examiners revoked Respondent's license as a contractor in Lake County for abandonment and code violations related to his work on Mr. Sweet's residence. On September 19, 1980 Earth Shelter through Respondent entered into a contract with James V. Migliorato to construct a residence in Seminole County, Florida. The contract price was $48,500. During the course of the work performed by Mr. McIntee, liens in the amount of approximately $9,500 were filed by third parties who provided materials and services under subcontract to Earth Shelter in the construction of Mr. Migliorato's residence. By March of 1981 Respondent had abandoned the project without cause. Mr. Migliorato later met with him at which time Respondent explained that he had run out of money and was not going to finish the job. In August of 1981 Mr. Migliorato and his counsel met with Respondent and his counsel. During their discussions Respondent stated that the money which he had been paid for work on the Migliorato home had been diverted by him for use on the Sweet residence mentioned above. The liens outstanding against Mr. Migliorato's property were never satisfied by Respondent and had to be paid by the homeowner. An example of the outstanding liens was that filed by Superior Distributors, Inc. which supplied and installed a kitchen and bathroom cabinet at the Migliorato residence. The work was completed on June 30, 1981 and invoiced on the same date for $2,128. This invoice has never been paid by Respondent.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED: That the Construction Industry Licensing Board enter a Final Order revoking Respondent's license as a certified building contractor in the State of Florida. DONE and RECOMMENDED this 14th day of October, 1983, in Tallahassee, Florida. MICHAEL P. DODSON Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 14th day of October, 1983.

Florida Laws (4) 120.57455.225489.119489.129
# 4
CONSTRUCTION INDUSTRY LICENSING BOARD vs. PEDRO LANDERA, 88-003306 (1988)
Division of Administrative Hearings, Florida Number: 88-003306 Latest Update: Feb. 10, 1989

Findings Of Fact At all times relevant hereto, respondent, Pedro P. Landera, was a certified general contractor having been issued license number CG C005371 by petitioner, Department of Professional Regulation, Construction Industry Licensing Board (Board), in March 1973. In January 1986 the license was suspended by the Board for three years and, except for the charges pending in this proceeding, Landera would be eligible to have it reactivated in early 1989. Thus, Landera has been without authority to use his license for the last three years. Landera did not contest the Board's suspension action and, in a settlement stipulation, admitted he violated Subsections 489.129(1)(c), (d), (e), (f) and (m), Florida Statutes (1981), by certain conduct taken in December 1983. On August 11, 1986, an individual using the name of James Burke entered into a construction contract with Charlie E. Mincey, the owner of Charlie Tires Service, 1700 N. W. 79th Street, Miami, Florida. The contract, which has been received in evidence as petitioner's exhibit 4, called for Burke, "in a timely manner," to make the following additions to Mincey's tire shop: construct a 34' X 40' room onto the existing building, erect an aluminum shed across the front of the building, including a four foot concrete slab floor, and add a five foot wall across the back side of the building. Burke represented on the contract that he held license number 254514-4. However, a search of the Board's records revealed Burke held no state license. The total price for the work was $15,650. On August 13, Mincey paid Burke $3,000 as a down payment on the job. According to Mincey, Burke began work on the additions several weeks after the contract was executed and continued to do so on and off for a few months. Eventually, a concrete block wall for the 34' x 40' room was built, but it had no roof, windows, doors, electric wiring, plumbing or paint. The aluminum shed was never built nor did Burke construct a five foot wall at the rear of the building as required by the contract. During October and early November 1986 Mincey made additional payments to Burke in the amount of $3,175, 1,000, $500, $400, $300, $300, and $40. This made a total of $8,715 paid by Mincey to Burke. Despite these payments, several subcontractors came to the job site during the same time period to unload materials but requested payment from Mincey before they would release them. Mincey paid the subcontractors $2,593.64, as evidenced by receipts received in evidence as petitioner's exhibit 7. When Burke did not return to the job site, and the project was still far from completed, Mincey attempted to contact Burke but could not find him. When he left the job site for the final time, Burke gave Mincey no notice of his intention to leave the job unfinished or any reason for doing so. Burke's whereabouts are still unknown, and there is now pending an outstanding warrant for his arrest. On September 30, 1986, a building permit application was filed with the Metropolitan Dade County building and zoning department seeking a permit for work to be done on Mincey's business. The application was filled out with three different colors of ink and in more than one person's handwriting. A carbon copy of the application has been received in evidence as petitioner's exhibit 9. The document was authenticated by a permit clerk of the Metropolitan Dade building and zoning department who identified the cashier's validation stamp, issuance date and permit number affixed to the document, all being indicia that the application was received and processed by that department. Further, the clerk attested to the fact that the carbon copy was a document normally kept in the regular course of business by her department. The application carries the signature, license number and social security number of respondent. The authenticity of respondent's signature was confirmed by a questioned document examiner whose testimony has been accepted as being credible and persuasive and was corroborated by respondent's own admission that the signature was his own. The author of the remaining writings on the document is unknown. Pursuant to the above application, a building permit was issued on October 1, 1986, for the work performed by Burke. The inspection record, which has been received as petitioner's exhibit 8, reflected that the job site was inspected by a Dade County inspector on October 1 and November 12, 1986. Also, the inspection record reflected that Gila Construction Company (GCC) was the contractor on the job. GCC is a Miami firm that Landera qualified in March 1984. Its owner is Gilbert Castillo. Mincey's building remains unfinished as of this date, and he contends the value of the work is less than the $11,308 that he paid to Burke and the subcontractors. In attempting to resolve the matter, Mincey learned that Landera's license number was on the permit application, and a complaint was eventually filed with the Board. However, prior to hearing, Mincey had never seen or talked to Landera, knew nothing of GCC, and considered the business transaction to be between he and Burke. Landera denied knowing Burke or authorizing him to use his license. Also, he maintained that he has not used his suspended license since the Board's action in early 1986. He denied signing the application in question and had no explanation as to how his signature got on the application except to suggest that someone may have obtained one with his signature and then fraudulently used the same to obtain a permit. Even so, there was no reason for Landera to sign an application during this period of time since his license was under suspension. Castillo, who owns GCC, denied knowing Burke or Mincey or having any knowledge of or participation in the Mincey job.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that respondent be found guilty as set forth in the conclusions of law, that he pay a $3,500 fine, and that his license be suspended until January, 1991. DONE AND ORDERED this 10th day of February, 1989, in Tallahassee, Leon County, Florida. DONALD R. ALEXANDER Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904)488-9675 Filed with the Clerk of the Division of Administrative Hearings this 10th day of February, 1989. APPENDIX Petitioner: 1-2. Covered in finding of fact 1. 3-4. Covered in finding of fact 2. Covered in findings of fact 3. and 5. Covered in finding of fact 4. Covered in finding of fact 6. Covered in finding of fact 1. Respondent: Covered in findings of fact 1 and 2. Covered in findings of fact 3 and 5. Covered in findings of fact 4 and 5. 4-5. Covered in finding of fact 8. Covered in findings of fact 2, 5 and 6. Covered in findings of fact 6 and 9. Covered in finding of fact 6. 9 Covered in findings of fact 9 and 10 COPIES FURNISHED: George W. Harrell, Esquire Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32399-0750 Luis F. DeLaCruz, Jr., Esquire 300 Sevilla Avenue Suite 313 Coral Gables, Florida 33134 Kenneth E. Easley, Esquire General Counsel 130 North Monroe Street Tallahassee, Florida 32399-0750 Fred Seely Executive Director Construction Industry Licensing Board Post Office Box 2 Jacksonville, Florida 32201

Florida Laws (6) 120.57489.105489.119489.127489.12990.803
# 5
CONSTRUCTION INDUSTRY LICENSING BOARD vs. BARRY L. CRITOPH, 83-000721 (1983)
Division of Administrative Hearings, Florida Number: 83-000721 Latest Update: Jan. 26, 1984

Findings Of Fact At all times material hereto, the Respondent was licensed as a certified building contractor, having been issued license number CB C012964 by the State of Florida. At all times material hereto, the Respondent was licensed as an individual only. On or about April 14, 1982, Cedar Homes of Pinellas, Inc., entered into a contract with Mary Fedico to enclose the carport on her home, which was located at 2085 Victory Avenue, Largo, Florida. The contract price was $5,000.00. Mike Fredricks acted as the saleman for this contract on behalf of Cedar Homes of Pinellas, Inc. At all times material hereto, Cedar Homes of Pinellas, Inc., was owned by Kenneth Larrow. The only employees of this corporation were Kenneth Larrow and his son. Cedar Homes of Pinellas, Inc., was formed in January of 1982 for the purpose of performing room additions and other types of construction. On April 14, 1982, the sole officer of Cedar Homes of Pinellas, Inc., was Kenneth Larrow, who also served as a director. An attorney John L. Riley, was the registered agent. At all times pertinent hereto, Kenneth Larrow was not licensed to engage in the business of contracting in the State of Florida. On or about April 16, 1982, Kenneth Larrow and his salesman, Mike Fredricks, went to the City of Largo Building Department to obtain a construction permit for the enclosure of Mary Fedico's carport. Neither of these persons wash qualified, or licensed, to engage in the business of contracting in the City of Largo. Therefore, the Largo Building Department refused to issue a permit for this construction. When Kenneth Larrow and Mike Fredricks were unable to obtain a permit for the construction of the addition to Mary Fedico's home, they informed the Largo Building Department that the qualifier for Cedar Homes of Pinellas, Inc., was Barry L. Critoph, the Respondent. The Largo Building Department informed Mr. Larrow and Mr. Fredricks that the Respondent had to sign the permit application in order for a permit to be issued for the construction to be performed on Mary Fedico's home. On or about April 16, 1982, the Respondent applied for and obtained a construction permit for the enclosure of Mary Fedico's carport. This permit was issued to Cedar Homes of Pinellas, Inc., with the Respondent as the qualifying contractor. At all times relevant hereto, the Respondent did not qualify Cedar Homes of Pinellas, Inc., with the Construction Industry Licensing Board. At all pertinent times, the Respondent did not have in his possession a certificate issued by the Construction Industry Licensing Board with the notation "Cedar Homes of Pinellas Inc." thereon. Moreover, the Respondent admitted he was not positive that he had properly qualified Cedar Homes of Pinellas Inc., when he obtained the permit for the enclosure of Mary Fedico's carport. On or about May 5, 1982, Cedar Homes of Pinellas, Inc., entered into a second contract with Mary Fedico to finish the interior of the carport which was to be enclosed by Cedar Homes of Pinellas, Inc., pursuant to the prior contract, for a price of $710. Kenneth Larrow began to perform the work required under the terms of the two contracts. Mary Fedico never saw the Respondent at the project site. Mr. Larrow hired all subcontractors and was responsible for paying them. He was also responsible for supervision of the construction of the carport enclosure. The Respondent did not know that there was a second contract for interior work in Mary Fedico's carport enclosure, and the Respondent performed no work on the project. He did drive his car by the site three times, but he never entered onto the project, and he simply viewed the construction being performed from the street. The Respondent had no knowledge as to who the subcontractors were on the Fedico project, and he had no responsibility for hiring them. He had no knowledge of the money that was being obtained from this project, and he did not know whether or not the subcontractors were being paid. At a time uncertain, construction of the carport enclosure addition to the Fedico home began to slow down. When Mary Fedico began to receive notices from subcontractors that they were not being paid, she contacted Kenneth Larrow about problems with the construction. However, when Mr. Larrow was unable to satisfactorily respond to Mary Fedico's questions regarding the work, she and her son-in-law took over the project, completed it, and paid all the subcontractors. The cost of completion was between $2,000 and $2,500 more than the contract price had been. As a result of the Fedico contracts noted above, Kenneth Larrow was charged with using the designation of "contractor" without a license, in two counts. Kenneth Larrow plead nolo contendere to these charges, and he was sentenced to pay a fine of $250 plus court costs. Mary Fedico first became aware that the Respondent had some involvement with the construction of the addition to her home when she was subpoenaed to appear at this court proceeding. Prior thereto, she had not been notified by either the Respondent or Mr. Larrow, that the Respondent had any connection with her carport project. The Respondent's involvement with Cedar Homes of Pinellas Inc., was limited to obtaining permits and "supervision". As compensation therefor, the Respondent was to received two percent of the gross sales of the company. He was supposed to check jobs and verify construction, but this supervision was to consist of checking the projects contracted for by Cedar Homes of Pinellas Inc., at his own convenience, to determine if these projects were "okay". The Respondent was not connected with the financial operation of Cedar Homes of Pinellas Inc., he had no financial control over the operations of the corporation, and he could not sign checks. All subcontractors were hired and paid by Kenneth Larrow. Mr. Larrow and his salesmen actually entered into the contracts, and the Respondent had no involvement with the contracts except to determine if work contracted for was structurally sound. Kenneth Larrow actually supervised all of the construction projects of Cedar Homes of Pinellas Inc., on a daily basis, and the Respondent was not aware of all the projects entered into by the corporation. Kenneth Larrow eventually made restitution to Mary Fedico in the amount of $1,250 for the problems which occurred in connection with the carport enclosure work on her home.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that license number CB C012964 held by the Respondent, Barry L. Critoph, be suspended for two years. THIS RECOMMENDED ORDER entered this 2nd day of December, 1983. WILLIAM B. THOMAS, Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 2nd day of December, 1983. COPIES FURNISHED: Stephanie A. Daniel, Esquire 130 North Monroe Street Tallahassee, Florida 32301 John J. Fogarty, Esquire 327 South Garden Avenue Clearwater, Florida 33517 Fred Roche, Secretary Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 Mr. J. K. Linnan Executive Director Florida Construction Industry Licensing Board Post Office Box 2 Jacksonville, Florida 32201

Florida Laws (5) 120.57455.225489.105489.119489.129
# 7
CONSTRUCTION INDUSTRY LICENSING BOARD vs. VICTOR S. DAVIS, 85-001963 (1985)
Division of Administrative Hearings, Florida Number: 85-001963 Latest Update: Dec. 03, 1985

Findings Of Fact Upon consideration of the oral and documentary evidence adduced at the hearing, the following facts were found: At all times material to these proceedings, the Respondent, Victor S. Davis, held a registered general contractor's license, numbered RG 0013635 issued by the State of Florida, Department of Professional Regulation, Construction Industry Licensing Board in April, 1973. At all times material to these proceedings, Respondent's general contractor's license, number RG 0013635, was in a delinquent status and had been in a delinquent status since July 1, 1977. Respondent failed to renew his license after June 30, 1975 but in May, 1976 made application to reinstate license number RG 0013635 which was approved and reinstated on an active status by Petitioner in May, 1976 and issued to Respondent, Victor S. Davis, qualifying Conch Construction Corp., of Key West, Florida. There was no evidence that the reinstated license was issued for Monroe County, Florida or that Respondent ever held a certificate of competency for Monroe County, Florida. At all times material to these proceedings, Respondent was an officer (Secretary) of Classic Marketing and Development, Inc. (Classic). On July 28, 1983, the Respondent, as Secretary of Classic, entered into a contract with William Dees to construct a shell home on the Dees' property located at Lot 14, Block 7, Breezeswept Estates, Ramrod Key, Florida for a contract price of $27,000.00. On September 13, 1983, William Dees applied for and obtained building permit No. 10902-A as owner/builder for the construction of the Dees's home. Construction of the Dees home began on or about September 13, 1983. Gregory H. O'Berry, President of Classic had knowledge of, and approved of, Respondent entering into contracts for construction of homes in Monroe County, Florida, including the contract with Dees. O'Berry was aware that Respondent did not hold a certificate of competency in Monroe County, Florida and that Respondent's registered general contractor's license did not cover contracting in Monroe County, Florida. O'Berry understood that Phillip A. Braeunig, a properly licensed general contractor in Monroe County, Florida, was acting as the general contractor for Classic- in the construction of homes by Classic, including the construction of the Dees home. Braeunig did not act as general contractor on the construction of the Dees' home. Respondent supervised the contraction of the Dees' home, until Respondent abandoned the construction of the Dees' home, and in performing these supervisory duties fulfilled the responsibilities of a general contractor. No other officer or authorized agent of Classic had any responsibility for the supervision of, or acted in any manner as a general contractor, in the construction of the Dees' home. Braeunig prepared and submitted to Respondent an application to qualify Classic with Petitioner using Braeunig's license but this application was never filed with Petitioner during- anytime material to these proceedings. Classic was never qualified by anyone, including Respondent or Braeunig, at any time material to these proceedings. Braeunig~acted as general contractor for Classic on the Conti home, which was in the beginning stages of Classic and prior to the Dees' job. Braeunig was brought into Classic for the purpose of acting as general contractor because of the Respondent's invalid license.

Recommendation Based upon the findings of fact and conclusions of law recited herein, it is RECOMMENDED that the Board enter a final order Dismissing Count I of the Amended Administrative Complaint filed against the Respondent. It is further RECOMMENDED that the Board enter a final order finding Respondent guilty of the violation charged in Count II of the Amended Administrative Complaint and for such violation it is RECOMMENDED that the Board suspend the Respondent's registered general contractor's license for a period of two (2) years and assess the Respondent with an administrative fine of $500.00, stay the suspension and place Respondent on probation for a period of two (2) years, provided the Respondent pays the $500.00 fine within ninety (90) days. Respondent's failure to pay the $500.00 fine within the time specified will result in his registered general contractor's license being suspended for a period of two (2) years with the requirement that when the fine is paid and the suspension lifted, the Respondent must appear before the Board for reinstatement of his license. Respectfully submitted and entered this 3rd of December, 1985, in Tallahassee, Leon County, Florida. WILLIAM R. CAVE Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, FL 32301 (904) 488-9675 FILED with the Clerk of the Division of Administrative Hearings this 3rd day of December, 1985. APPENDIX Department of Professional Regulation, Construction Industry Licensing Board v. Victor S. Davis, Division of Administrative Hearings Case No. 85-1963 Ruling on Petitioner's Proposed Findings of Fact: Adopted in Finding of Fact No. 1 except for the statement that "Respondent's license was issued for Okaloosa County only" which is rejected as not being based upon competent substantial evidence. Hearsay alone is not sufficient to support a finding of fact. Adopted in Finding of Fact No. 1 except for statement that "said license has been delinquent since July, 1981" which is rejected as being contrary to the evidence in Petitioner's Exhibit No. 1 which shows delinquent status as of July 1, 1977. Adopted in Finding of Fact No. 3. Rejected as a conclusion of law rather than a proposed finding of fact. Considered as background information and not as a finding of faet. Adopted in Finding of Fact No. 4. Adopted in Finding of Fact No. 5. Adopted in Finding of Fact Nos. 4 and 5. Adopted in Finding of Fact Nos. 5 and 7. Adopted in Finding of Fact No. 5. Adopted in Finding of Fact No. 6. Adopted in Finding of Fact No. 6. Adopted in Finding of Fact No. 9. Adopted in Finding of Fact No. 9. Adopted in Finding of Fact No. 9. Adopted in Finding of Fact No. 9. Adopted in Finding of feet No. 10 Adopted in Finding of Fact No. 10 Rejected as a conclusion of law rather than a proposed finding of fact. Respondent did not submit Proposed Findings of Fact. COPIES FURNISHED: James Linnan, Executive Director Department of Professional Regulation Construction Industry Licensing Board P. O. Box 2 Jacksonville, FL 32202 Nancy M. Snurkowski, Esq. Department of Professional Regulation 130 North Monroe Street Tallahassee, FL 32301 Fred Roche, Secretary Department of Professional Regulation 130 North Monroe Street Tallahassee, FL 32301 Victor S. Davis 2169 North Hercules Avenue Clearwater, FL 33575 and 6290 Sandcrest Circle Orlando, FL 32819

Florida Laws (8) 120.57489.115489.117489.119489.127489.129775.082775.084