CONSTRUCTION INDUSTRY LICENSING BOARD vs. JULIUS H. ISAAC, 87-005586 (1987)
Division of Administrative Hearings, Florida Number: 87-005586 Latest Update: May 27, 1988

The Issue Whether respondent on several occasions aided an unlicensed contractor to engage in contracting by obtaining permits on respondent's license for contracting jobs performed by the unlicensed contractor; Whether respondent committed the statutory violations alleged; and If so, whether respondent's license should be suspended or revoked, or whether some other penalty should be imposed.

Findings Of Fact At all times material to the Administrative Complaint, respondent was a certified general contractor in Florida holding License No. CG C000572. Johnnie T. Thomas is the president of J. T. Thomas Construction Company. Mr. Thomas is not a licensed contractor in the State of Florida. Although respondent has used his license to qualify several corporations, the last being Julius Isaac & Association, Inc., respondent never qualified J. T. Thomas Construction Company. Indeed, J. T. Thomas Construction has never been qualified by any licensee. During the time period relevant to this action, J. T. Thomas Construction Company was the name used by Mr. Thomas to engage in the contracting business. On July 25, 1983, J. T. Thomas Construction Company contracted with Hazel N. Jones for the construction of a residence at 11729 Rock Hill Road, Thonotosassa, Florida, in Hillsborough County. Johnnie Thomas signed the contract on behalf of J. T. Thomas Construction Company as "President and Builder." Ms. Jones did not know that Mr. Thomas was unlicensed. James Montjoy drew the plans for the house and recommended Thomas as the builder. The total price for the house was $75,500. The house was started in September of 1983, and on January 30, 1984 final payment was made. After moving into the house, Ms. Jones discovered several problems. In June of 1984 an energy check found that the home was not properly insulated; however, this was apparently corrected in May of 1985. Ms. Jones had several other problems with the home and sent a "punch-list" to Mr. Thomas setting forth the items that needed to be corrected. Although Mr. Thomas admitted at the hearing that there were items that should have been corrected on the punch-list, he also admitted that he did not correct them because he disputed other claims of Ms. Jones. The building permit application for Ms. Jones' home was signed by the respondent. On the building permit application, the contractor was listed as Julius Isaac and Association, Inc. The building permit was issued on August 15, 1983. It listed Julius H. Isaac and Julius Isaac and Association, Inc. as the contractor. The building permit was signed by Julius H. Isaac as agent. Ms. Jones never met Mr. Isaac, never saw him and never knew that he was involved in any way in the construction of her home. In late 1984, Ms. Catherine Farragut, the owner of a building located at 1704 North Nebraska Avenue, Tampa, Florida, contracted with J. T. Thomas to have her building remodeled. Ms. Jones recommended Mr. Thomas to Ms. Farragut before Ms. Jones began to experience problems with Mr. Thomas. Ms. Farragut was not aware that Mr. Thomas was not a licensed contractor. The remodeling of the building was completed in early 1985. The permit for the interior remodeling of the offices at 1704 North Nebraska Avenue was issued on July 23, 1984 to Julius Isaac & Association. Ms. Farragut did see Isaac at the job site in the central parking area; however, Mr. Thomas never advised Ms. Farragut that respondent was involved with the project. On August 20, 1985 J. T. Thomas Construction Company contracted with Evelyn S. Williams to construct a residence at 3620 East North Bay Street, Tampa, Florida. The contract price for the home was 66,000 and payments by check were made to Johnnie Thomas in intervals. Construction on the home began in November 1985. Ms. Williams moved into the home in August of 1986. She discovered some problems with the house, and gave Mr. Thomas a list of the items that needed to be corrected. Mr. Thomas corrected all the items but one. Ms. Williams still has a problem with the roof getting moldy due to water retention. A permit was issued by the City of Tampa Building Department on November 20, 1985, for construction at 3620 East North Bay Street. The permit was issued to Julius Isaac and the contractor of record is stated as Julius Isaac d/b/a Julius Isaac & Associates. Ms. Williams never met Mr. Isaac or saw him; however, Ms. Williams did not go to the job site during construction since the mortgage company was supposed to periodically inspect the house during construction. Ms. Williams was not aware that Mr. Thomas was unlicensed. On August 28, 1986, J. T. Thomas Construction Company entered into a written contract with Ms. Verlie Nelson to construct a residence at 8105 Jad Drive for a price of $102,560. Ms. Nelson thought that Mr. Thomas was a licensed contractor. She never saw Mr. Isaac at the job site, however, she was rarely there because Sun Coast Federal Credit Union was paid to do the inspections. On October 16, 1986, respondent applied for a building permit for 8105 Jad Drive. John and Augusta Thomas were listed as the owners and Julius Isaac & Association, Inc., was listed as the general contractor for the project. On November 7, 1986, the permit was issued by the Hillsborough County Building Department. Julius H. Isaac was listed as the applicant and contractor. John and Augusta Thomas were listed as the owners of the property at 8105 Jad Drive. Mr. Thomas admitted that J. T. Thomas Construction Company built the homes for Ms. Jones, Ms. Nelson and Ms. Williams, and did the renovation on the building owned by Ms. Farragut. Mr. Thomas received the payments for the projects, hired and paid the subcontractors and supervised construction. He also managed the daily affairs of J. T. Thomas Construction Company. J. T. Thomas Construction Company was formed in 1971 under the name Thomas (J. T.) Construction Company. However, the company, as a corporate entity, was dissolved by proclamation in 1973. J. T. Thomas' brother Leslie was the secretary of the corporation and a licensed contractor. He obtained the building permits for the company until be became ill. Thereafter, respondent obtained the building permits for J. T. Thomas Construction Company. Respondent knew that Mr. Thomas was not licensed and could not get the permits himself. Respondent is not a salaried employee of J. T. Thomas Construction Company, and he received no compensation for his services although he was reimbursed for the actual cost of obtaining the permits. Other than obtaining the permits, respondent's only connection with Mr. Thomas' construction projects was to visit job sites before inspections or go to a site if Mr. Thomas asked for his help with a construction problem. However, there was no competent evidence establishing that respondent ever went to the particular job sites involved in this case. Respondent had no responsibilities in connection with the projects and had no authority to take any actions. In essence, respondent was simply "helping" a long time friend. Respondent has been licensed since 1968, and there was no evidence presented of any prior violations or any prior complaints.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that the Construction Industry Licensing Board enter a final order finding respondent guilty of the act set forth in Section 489.129(e), Florida Statutes, and imposing an administrative fine of $1,500. DONE AND ENTERED this 27th day of May, 1988, in Tallahassee, Florida. DIANE A. GRUBBS Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 27th day of May, 1988. APPENDIX TO RECOMMENDED ORDER, CASE NO. 87-5586 Rulings on petitioner's proposed findings of fact by paragraph: 1-8 Accepted generally. COPIES FURNISHED: David L. Swanson, Esquire Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32399-0750 Julius H. Isaac 421 Ella Mae Avenue Tampa, Florida 33602 Fred Seely Executive Director Construction Industry Licensing Board Post Office Box 2 Jacksonville, Florida 32201 William O'Neil Stephen F. Hanlon, Esquire General Counsel BARNETT, BOLT & KIRKWOOD Department of Professional Post Office Box 3287 Regulation 100 Twiggs Street 130 North Monroe Street Sixth Floor Tallahassee, Florida 32399-0750 Tampa, Florida 33602

Florida Laws (5) 120.57489.105489.113489.119489.129
# 2
CONSTRUCTION INDUSTRY LICENSING BOARD vs. GILBERT SYKES, 83-003073 (1983)
Division of Administrative Hearings, Florida Number: 83-003073 Latest Update: Apr. 24, 1984

The Issue The issues in this case are those promoted by the Administrative Complaint by Department of Professional Regulation against Respondent accusing him of violations of Chapter 489, Florida Statutes, pertaining to work done for Mary Scott. This circumstance is more particularly discussed in findings of fact and conclusions of law.

Findings Of Fact Respondent is a registered building contractor and a registered roofing contractor, having been issued license No. RB 0009302 and RC 0032535. Said licenses were in effect as of the date of the hearing in this matter. Both of Respondent's licenses had become delinquent in July 1981 and were not renewed until June 1983. On or about November 11, 1982, Mary Scott entered into a contract with Henry Hodge, doing business as "Direct Interiors," pursuant to which Hodge was to construct an addition to the Scott residence located at 1439 West 2nd Street, Jacksonville, Florida. The contract price was $6,848.00. On November 24, 1982, Respondent used his registered building contractor's license to help obtain building permit No. 10047 from the City of Jacksonville, Building and Zoning Department, for the construction of the addition to the Scott residence under her contract with Henry Hodge. At no time material hereto was Henry Hodge or "Direct Interiors" licensed to engage in the business of contracting in the State of Florida. At no time did the Respondent qualify "Direct Interiors" to engage in the business of contracting. Respondent helped obtain the permit at Hodge's request, as a favor to Hodge. Respondent has never been partners or otherwise done business with Hodge. Respondent became casually acquainted with Hodge when they both were working on the same construction site, unrelated to this case. Respondent helped Hodge obtain the permit as follows: Hodge approached Respondent and asked Respondent to obtain the permit for the Scott jot. Respondent told Hodge to bring Respondent a building permit application form. Hodge did this, and Respondent then signed the application while it was still blank. Hodge thereafter filled in the details, took the application in to the building department, and received the building permit. Respondent had no knowledge of the size or other details of the work on the Scott job, other that it was a room addition. At not time while Henry Hodge was working on the Scott job did Respondent visit the job site or in any way supervise the work. Henry Hodge, as "Direct Interiors," completed construction of the addition and received $5,924.00 in payment from Mary Scott. The contract between Hodge and Scott called for building a room addition and for reroofing certain portions of the roof of the existing structure. After Hodge completed the job, portions of the reroofed area which had not leaked before Hodge reroofed it, began to leak. Mary Scott was not able to obtain satisfactory performance from Hodge concerning this problem. She then contacted the building department and found that the building permit was obtained upon Respondent's license. Until that point, she was unaware of Respondent. Subsequently, Respondent corrected the work done by Hodge.

Recommendation Upon consideration of the facts found, conclusions of law and matters in mitigation and aggravation, it is RECOMMENDED that a final order be entered imposing a $500.00 fine for the violations found. DONE AND ENTERED this 5th day of March 1984 in Tallahassee, Florida. CHARLES C. ADAMS Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 5th day of March 1984. COPIES FURNISHED: Harold M. Braxton, Esquire 45 Southwest 36th Court Miami, Florida 33135 Mr. Gilbert Sykes 4862 Soutel Drive Jacksonville, Florida 32208 James Linnan, Executive Director Construction Industry Licensing Board Post Office Box 2 Jacksonville, Florida 32202 Fred M. Roche, Secretary Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301

Florida Laws (4) 120.57489.115489.119489.129
# 5
CONSTRUCTION INDUSTRY LICENSING BOARD vs ED J. ADAMS, 95-005908 (1995)
Division of Administrative Hearings, Florida Filed:Orlando, Florida Dec. 04, 1995 Number: 95-005908 Latest Update: Aug. 14, 1996

The Issue The issues for determination are whether Respondent committed the acts alleged in the Administrative Complaint and, if so, what, if any, penalty should be imposed.

Findings Of Fact Petitioner is the governmental agency responsible for issuing licenses to practice as building contractors. Petitioner is also responsible for regulating such licensees on behalf of the state. At all times pertinent to this proceeding, Respondent has been licensed individually as a Certified General Contractor pursuant to license number CG C 0055328 issued by the Construction Industry Licensing Board (the "Board"). Respondent has never been licensed by the Board as the qualifying agent for Mr. Gary Butler ("Butler"), an unlicensed contractor. In 1993, Respondent entered into an agreement with Butler who has never been licensed by the Board. The terms of the agreement require Respondent to pull permits for construction projects entered into by Butler. Butler pays Respondent for each permit or weekly. Respondent supervises some, but not all, of the projects undertaken by Butler. In August, 1993, Mr. Lynn Kyler ("Kyler"), the owner of a residence constructed by Ms. Denise Pyke ("Pyke"), a Certified Residential Contractor, asked Pyke to find a contractor to build a new dock and boat house at Kyler's residence. The Kyler residence is a lake front home located at 10250 State Road 561 A, Clermont, Lake County, Florida. Kyler authorized Pyke to act as Kyler's agent for construction of the dock and boat house. Kyler resided in Indiana from August through late fall of 1993. Pyke obtained recommendations of various candidates including Butler. Butler represented himself as a licensed and insured builder of docks and boat houses. Butler provided Pyke with a business card representing that Butler is licensed and insured. Pyke obtained cost and design proposals from Butler and Norquist Construction Company and communicated the proposals to Kyler. Kyler chose Butler. Butler agreed to demolish the existing dock and construct a new dock and boat house (the "project"). Kyler paid Butler the full contract price of $6,897.60. Prior to the completion of the project, neither Respondent nor Butler disclosed to Pyke or Kyler that Butler was unlicensed. Nor did they disclose that Butler would use Respondent's license to pull the permit for the project. Respondent knew that Butler is not licensed as a contractor, in any capacity. On August 25, 1993, Respondent and Butler went to the Lake County Building Department. Respondent used his license to pull Permit Number T93- 04793 for the project. The permit was issued to Respondent, listed Respondent's license as the certified general contractor, and was maintained in the official records of the Lake County Building Department. Respondent listed himself on the permit as the contractor for the entire project without limitation and without reference to Butler. Respondent was not authorized by Pyke or Kyler to pull the permit or to participate in the project. At the time, neither Pyke nor Kyler were aware of Respondent's existence or his role in the project. Respondent did not participate and had no involvement in the project except pulling the permit. The project was commenced by Butler in August, 1993, and completed shortly thereafter. Respondent did not supervise or participate in the construction of the project. Butler began the project without first filing a Notice of Commencement. Butler constructed the project with only a 10 foot setback in violation of the 25 foot setback required in Lake County Code Ordinance 10.0401(3)(d). Butler also failed to obtain an electrical permit in violation of Standard Building Code, Section 103.1.1. (1991). The project, as built by Butler, has no value to Kyler. The project failed final inspection for violation of the 25 foot setback and failure to obtain an electrical permit. The roof tiles on the boat house had to be removed because they were falling off the roof. The project itself is coming apart. It will cost between $10,000 and $12,000 to bring the project into compliance with local code requirements and to make it usable. Respondent was aware of the 25 foot setback when he pulled the permit for the project. The project plans submitted for the permit reflect the 25 foot setback. Lake County allows contractors to withdraw permits that have already been pulled. Respondent never withdrew the permit for the project. Butler was unable to obtain a final inspection because he failed to file a Notice Of Commencement at the outset of the project. Pyke and Kyler filed the Notice Of Commencement in order to obtain the final inspection. As the contractor of record, it was Respondent's responsibility to ensure that a Notice of Commencement was filed and that the project passed final inspection. While obtaining the information necessary to file the Notice Of Commencement, Pyke and Kyler learned that Butler was unlicensed and uninsured and that Respondent had used his license to pull the permit. When confronted by Pyke, Respondent did not deny knowledge of the project and assured Pyke that the problems with the project would be corrected. Despite Respondent's assurances, the code violations have not been corrected. Nor have the defects in construction been corrected.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Board enter a Final Order finding Respondent guilty of violating: Sections 489.129(1)(c) and 455.227(1)(a); and Sections 489.129(1) (e), (f), (n), and (p). It is further recommended that the Board place Respondent on probation for three years, subject to reasonable conditions, impose an administrative fine of $5,000, and assess costs of $717.50 plus reasonable costs incurred by Petitioner subsequent to the date of this Recommended Order to investigate and prosecute this proceeding to its conclusion. RECOMMENDED this 28th day of March, 1996, in Tallahassee, Florida. DANIEL S. MANRY, Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 28th day of March 1996.

Florida Laws (3) 17.001455.227489.129 Florida Administrative Code (2) 61G4-17.00161G4-17.002
# 6
CONSTRUCTION INDUSTRY LICENSING BOARD vs. SEBASTIAN R. SIRVEN, 82-001446 (1982)
Division of Administrative Hearings, Florida Number: 82-001446 Latest Update: Dec. 04, 1990

Findings Of Fact Based upon my observation of the witnesses and their demeanor while testifying, and the documentary evidence adduced at the hearing, the following relevant facts are found. During times material herein, Respondent, Sebastian R. Sirven, was a certified general contractor and has been issued license numbers CG C003075 and CG CA03075. At all times material, Respondent was sole qualifier of Dynamic Construction Land Development Corporation. Dynamic Construction Land Development Corporation (herein Dynamic) was the developer of homes in the Gil-Mar Subdivision in Sweetwater, having been listed as such on all pertinent official records, including all building permits obtained for the aforesaid homes. Dynamic commenced construction on Lots 19 through 28, Block 3 in Gil- Mar Subdivision without first obtaining building permits there for. In this regard, construction had progressed to various stages in several of the homes, including the pouring of footings in some and the erection of walls and roofs on others before permits were issued. (TR p. 13, Respondent) It was noted that while application for the building permits for the above-referred homes had been filed by the President of Dynamic, Jorge Gomez, such applications had not been approved by the City of Sweetwater until a date subsequent to the commencement of construction. (See, Exhibit #1, pages 38 and 56.) Tie beams were poured on residences being constructed on Lots 19, 20, 21 and 22 of the Gil-Mar Subdivision without first having been inspected pursuant to the code. (Testimony of Delaney and Respondent) Frank Lubien, building official for Dade County, issued several verbal stop work orders to Dynamic which were briefly obeyed, and then were consistently and repeatedly ignored. On July 28, 1980, written stop orders were issued which again were disregarded by employees and representatives of Dynamic. (Testimony of Lubien and Delaney; Exhibit #1, pages 9, 45-50) Respondent, while not being directly in control of construction until after Dade County Building Department issued stop work orders for Dynamic at the subject subdivision, frequently visited the construction site subsequent to the issuance of the stop work orders. As testified to by Inspector Lubien, inspections of the subject construction activities by Dynamic were made and appeared to have been in conformity with acceptable contracting practices. In this regard, evidence reveals that the code violations as to the method of permissible construction alleged in Count VI of the Administrative Complaint filed herein, were timely corrected. Respondent avers that he was not at fault in the constructing activities here complained of inasmuch as he was not on the scene until it came to his attention that stop orders had been issued for the construction project. In support thereof, Respondent refers to the fact that he was working on another construction project in Volusia County, Florida and was unaware of the alleged violations here complained of. Finally, Respondent contends that once he came to the construction site, no further violations occurred by Dynamic.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is hereby RECOMMENDED: That the Petitioner find Respondent guilty of Counts I through V and be ordered to pay an administrative fine of $100 per count; That the Respondent's licenses to practice contracting (License Nos. CG C003075 and CG CA03075) be placed on probation for a period of one (1) year. RECOMMENDED this 15th day of April, 1983, in Tallahassee, Florida. JAMES E. BRADWELL, Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 15th day of April, 1983.

Florida Laws (2) 120.57489.129
# 7
DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION, CONSTRUCTION INDUSTRY LICENSING BOARD vs ANTONIO L. REQUEJO, 15-007339PL (2015)
Division of Administrative Hearings, Florida Filed:Lighthouse Point, Florida Dec. 28, 2015 Number: 15-007339PL Latest Update: Dec. 01, 2016

The Issue Whether Respondent performed an act which assisted an entity in engaging in the prohibited uncertified and unregistered practice of contracting or whether he abandoned a construction project in which he was engaged or under contract as a contractor, in violation of section 489.129(1), Florida Statutes, as set forth in the Administrative Complaint, and, if so, what is the appropriate sanction.

Findings Of Fact The Board is the state agency charged with regulating the practice of construction contracting pursuant to section 20.165 and chapters 455 and 489, Florida Statutes. At all times material to this proceeding, Mr. Requejo was licensed as a certified general contractor in the state of Florida, having been issued license number CGC 1504266. Mr. Requejo’s address of record is 15941 Southwest 53rd Court, Southwest Ranches, Florida 33331. At all times material to this proceeding, Mr. Requejo was the primary qualifying agent of Recol, Inc. Mr. Andre Chestnut was formerly a registered contractor in the state of Florida. He testified credibly that he used to have nine licenses. At all times relevant to this case, he held no state licensure as a contractor. Consistent with Department records, he testified that his license had been revoked sometime around August 2003. USA Screens was incorporated in December 2011 to perform “any and all lawful business,” with Mr. Chestnut as the incorporator, registered agent, and president. Records of the Department contain no evidence that USA Screens, Inc., has ever been qualified by a licensed contractor or had an active license as a construction business. Ms. Carmen Goehrig owned real property at 6300 Pinehurst Circle East in Tamarac, Florida. She wished to install a screen enclosure on the property. On January 21, 2012, she entered into a construction contract with USA Screens, Inc., signed by Mr. Chestnut. This constituted the practice of contracting by Mr. Chestnut and USA Screens, Inc. Mr. Chestnut testified that he had been working in conjunction with Mr. Requejo on various projects for the past nine years. He credibly testified that he received the template for the contract he entered into with Ms. Goehrig from Mr. Requejo. That contract template contains the full name and address for both Recol, Inc., and USA Screens, Inc., at the top of the contract in large type, but shows only one contractor’s license number, that of Mr. Requejo, under the address for Recol, Inc. No contractor’s license number is shown under the USA Screens, Inc., address. Having worked with Mr. Chestnut for nine years, and having prepared the template contract that they used for common projects, Mr. Requejo had reasonable grounds to know that USA Screens, Inc., was uncertified and unregistered, as suggested by the contract itself. The contract mentioned that it was contingent upon both homeowner association and government approvals, and included a handwritten provision that there would be “no material purchases until association approval.” Ms. Goehrig signed two checks to USA Screens, Inc.: the first in the amount of $500.00 for the application; the other in the amount of $3,000.00 for materials. Both checks were cashed on January 24, 2012. On February 14, 2012, Mr. Requejo, d/b/a Recol, Inc., timely filed building permit application 12-636 for construction of the screen enclosure at 6300 Pinehurst Circle East with the city of Tamarac, using his general contractor’s license number. Recol, Inc., is listed as the general contractor in the city’s records. In filing for a permit from the city of Tamarac for the construction, Mr. Requejo assisted USA Screens, Inc., and Mr. Chestnut in engaging in the prohibited uncertified and unregistered practice of contracting. Mr. Claudio Grande is the chief building official for the city of Tamarac. He oversees permitting and is the custodian of records. He testified that permit 12-636 was denied due to zoning restrictions and structural issues. Mr. Chestnut testified that he made numerous calls trying to get the permit approved. He testified that the problem was that the screen enclosure encroached on a utility easement. As Mr. Goehrig testified: They applied for the permit. He showed us the drawings, Andre, and to my knowledge, submitted the permit application. And then we noticed that the second check was cashed, so we started calling him about that. And all he would say is, “Don’t worry, don’t worry, don’t worry.” And then the permit was denied and then we went back and tried to do something to get it approved and it was denied. And then zoning finally denied it again. So three times, we tried to fix it to make it work. And we finally, you know, the zoning department finally came down and said, “No, end of story, no good.” So we went to him and said, “Okay, we can’t get the permit, please just give us our money back and we’ll go on our way.” And of course, his answer was, “No, you’re not getting any money back, I spent your money, goodbye.” After the permit was finally denied and Mr. Chestnut refused to return their money, the Goehrigs contacted Mr. Requejo to get their money back, again to no avail. It was not shown that the project was terminated without just cause or that it was terminated without proper notification to Ms. Goehrig. It is clear from the filed complaint, as well as the testimony that Ms. Goehrig was aware that the project could not be permitted, and sought a return of the money that had been paid. “The permit was denied and [Chestnut] refuses to refund our deposit.” The Department failed to prove that Mr. Requejo abandoned a construction project in which he was engaged or under contract as a contractor. Prior Discipline On February 13, 2013, a Final Order Adopting Settlement and Vacating Prior Orders was filed by the Board. The Order incorporated a settlement agreement imposing discipline for allegations in several earlier Administrative Complaints. The October 2012 settlement agreement required the payment of fines, investigatory costs, and restitution to six individuals, as well as continuing education and a six-year period of probation. The Order constitutes prior discipline within the meaning of the disciplinary guidelines.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Construction Industry Licensing Board enter a final order finding Mr. Antonio L. Requejo in violation of section 489.129(1)(d), Florida Statutes; suspending his contractor’s license for a period of six months, followed by a period of probation deemed advisable by the Board; imposing a fine of $7,000.00; and directing that he make restitution in the amount of $3,500.00 to Carmen Goehrig. DONE AND ENTERED this 17th day of March, 2016, in Tallahassee, Leon County, Florida. S F. SCOTT BOYD Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 17th day of March, 2016. COPIES FURNISHED: Sorin Ardelean, Esquire Department of Business and Professional Regulation Northwood Centre 1940 North Monroe Street Tallahassee, Florida 32399-2202 (eServed) Antonio L. Requejo 11826 B. Miramar Parkway Miramar, Florida 33025 Daniel Biggins, Executive Director Construction Industry Licensing Board Department of Business and Professional Regulation Northwood Centre 1940 North Monroe Street Tallahassee, Florida 32399 (eServed) William N. Spicola, General Counsel Department of Business and Professional Regulation Northwood Centre 1940 North Monroe Street Tallahassee, Florida 32399 (eServed)

Florida Laws (6) 120.569120.5717.00117.002489.1195489.129
# 8
CONSTRUCTION INDUSTRY LICENSING BOARD vs. JOHN GONZALEZ, 88-001772 (1988)
Division of Administrative Hearings, Florida Number: 88-001772 Latest Update: Aug. 15, 1988

Findings Of Fact From May 1, 1985, through June 30, 1987, Respondent, John Gonzalez, was a registered general contractor and qualifying agent for Le-Go Developers, Inc., license-number RG-A02757. On his application for qualification of Le-Go Developers, Inc., respondent was required to list his individual address and the address of the business entity. To this end, respondent provided an individual address of 8435 Crespi Boulevard, Miami Beach, Florida, and a business address of Le-Go Developers, Inc., of 9840 S.W. 81st Street, Miami, Florida. On March 25, 1986, Ms. Selma Roberts contracted, through respondent, with Le-Go Developers, Inc., for certain repairs to an apartment complex owned by her, and located at 8415 Crespi Boulevard, Miami Beach, Florida. At the time, respondent was a tenant of Ms. Roberts. Pursuant to the terms of the agreement, Le-Go Developers, Inc., was to repair an existing dock for $700 and paint the railings in the apartment complex for $400. Ms. Roberts paid Le-Go Developers, Inc., $1,100 in advance for the work. At no time did Ms. Roberts and respondent discuss the need for a building permit to undertake the agreed upon work, and no permit was secured for the project or posted on the job site. The building regulation pertinent to this case provide: PERMITS REQUIRED It shall be unlawful to construct, enlarge, alter, repair, move, remove or demolish any building structure, or any part thereof. . . without first having filed application and obtained a permit therefor, from the Building official.... EXCEPTION: No permit shall be required, in this or any of the following sections, for general maintenance or repairs...the value of which does not exceed one hundred dollars ($100.00) in labor and material as determined by the Building official. Permits, to be issued by the Building Official, shall be required for the following: (a) The erection or construction of any building or structure, the adding to, enlarging, repairing, improving, altering, covering, or extending of any building or structure. Respondent repaired the dock and painted the railings in the apartment house. The work was not, however, apparently to Ms. Roberts' satisfaction and she paid a third party $100 to correct the deficiencies she perceived. While the work may not have satisfied Ms. Roberts, there is no competent proof that respondent did not comply with the terms of the agreement, that the work was not performed in a workmanlike manner, or that the work did not conform to existing building codes. At some point during the spring of 1987, respondent moved from the apartment at 8415 Crespi Boulevard to a new residence, and permitted his license to lapse. Respondent did not notify petitioner of his new residence address until he applied to reinstate his license in April 1988, as discussed infra. The petitioner's records demonstrate that respondent's license was on a delinquent status for non-renewal from July 1, 1987, until his application to change the status of his license and reinstate his license was approved May 23, 1988. In his application, dated April 4, 1988, respondent listed his residence address as 8440 Byron Avenue, Miami, Florida.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that a final order be entered imposing a reprimand and administrative fine in the sum of $250 against respondent. DONE AND ENTERED in Tallahassee, Leon County, Florida, this 15th day of August, 1988. WILLIAM J. KENDRICK Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1050 Filed with the Clerk of the Division of Administrative Hearings this 15th day of August, 1988. APPENDIX Petitioner's proposed findings of fact are addressed as follows: 1. Addressed in paragraph 3. 2 & 4. Addressed in paragraph 4. 3. To the extent pertinent, addressed in paragraph 1. 5-7. Addressed in paragraphs 7 and 8. 8-9. Addressed in paragraph 5 and paragraph 2 of the Conclusions of Law. 10. Addressed in paragraph 9. COPIES FURNISHED: Belinda H. Miller, Esquire Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32399-0750 Mr. John Gonzalez 8440 Byron Avenue, #1 Miami, Florida 33167 Fred Seely, Executive Director Department of Professional Regulation Construction Industry Licensing Board Post Office Box 2 Jacksonville, Florida 32201 William O'Neil, Esquire General Counsel Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32399-0750

Florida Laws (1) 489.129