The Issue The issues are whether to (a) issue an Environmental Resource Permit (ERP) to the Department of Transportation (DOT) and Martin County (County) authorizing construction and operation of a surface water management system to serve a project known as the Indian Street Bridge; (b) issue DOT a letter of modification of ERP No. 43-00785-S authorizing roadway and drainage modifications to the Kanner Highway/Indian Street intersection; and (c) issue DOT a letter of modification of ERP No. 43-01229-P authorizing roadway and drainage modifications to Indian Street between the intersections of Kanner Highway and Willoughby Boulevard.
Findings Of Fact Based on the evidence presented by the parties, the following findings of fact are made: The Parties Petitioner Citizens for Smart Growth, Inc., is a Florida 501(c)(3) corporation with its principal place of business in Palm City, Florida. It was formed by Odias Smith in August 2001, who serves as its president. The original directors were Kathie Smith, Odias Smith, and Craig Smith, who is the Smiths' son. The composition of the Board has never changed. According to the original Articles of Incorporation, its objectives are "preserving and enhancing the present advantages of living in Martin County (Quality of Life) for the common good, through public education, and the encouragement of reasonable and considered decision making by full disclosure of impacts and alternatives for the most appropriate use of land, water and resources." The exact number of members fluctuates from time to time. There are no dues paid by any member. At his deposition, Mr. Smith stated that no membership list exists; however, Kathie Smith stated that she currently has a list of 125 names, consisting of persons who at one time or another have made a contribution, have attended a meeting, or asked to be "kept informed of what's going on or asked to be on a mailing list or a telephone list, so they could be advised when we have meetings." No meetings have been held since 2006. Therefore, the Petitions filed in these cases have never been discussed at any meetings of the members, although Ms. Smith indicated that telephone discussions periodically occur with various individuals. Kathie Smith believes that roughly 25 percent of the members reside in a mobile home park north of the project site on Kanner Highway on the eastern side of the St. Lucie River, she does not know how many members reside on the western side of the St. Lucie River, and she is unaware of any member who resides on the South Fork of the St. Lucie River immediately adjacent to the project. Although the three Petitions allege that "seventy percent of the members . . . reside and/or recreate on the St. Lucie River," and in greater detail they allege how those members use that water body or depend on it for their livelihood, no evidence was submitted to support these allegations that 70 percent (or any other percentage of members) use or depend on the South Fork of the St. Lucie River for recreational or other activities. Petitioners Odias Smith and Cathie Smith reside in Palm City, an unincorporated community just south of Stuart in Martin County. They have opposed the construction of the new bridge since they moved to Palm City in 2001. It is fair to infer that Mr. Smith formed the corporation primarily for the purpose of opposing the bridge. Their home faces north, overlooking the South Fork of the St. Lucie River, from which it is separated by Saint Lucie Shores Drive and a narrow strip of common-ownership property. A boat dock extends from the common-ownership property into the St. Lucie River, providing 5 slips for use by the Smiths and other co-owners. The home is located three blocks or approximately 1,000 feet from the proposed western landfall of the new bridge. Due to the direction that the house faces (north) and the site of the new bridge, the surface water management system elements associated with the bridge will not be visible from their property. Mr. Smith believes, however, that when looking south through a veranda window on the second floor of his home, he will be able to see at least a part of the new bridge. From the front of their house, they now have an unobstructed view of the existing Palm City Bridge, a large structure that crosses the St. Lucie River approximately six- tenths of a mile north of their home, and which is similar in size to the new bridge now being proposed by the Applicants. The Smiths' home is more than 500 feet from the Project's right- of-way, and they do not know of any impact on its value caused by the Project. While the Smiths currently engage in walking, boating, running, fishing, and watching wildlife in the neighborhood or the South Fork of the St. Lucie River, there was no credible evidence that the Project would prevent them from doing so after the bridge and other improvements are constructed. Also, there was no evidence showing that the ERP Letter Modifications will cause them to suffer any adverse impacts. In fact, as noted below, by DOT undertaking the Project, the neighborhood will be improved through reduced flooding, improved water quality, and new swales and ponds. The County is a political subdivision of the State. It filed one of the applications at issue in this proceeding. DOT is an agency of the State and filed the three applications being contested. The District has the power and duty to exercise regulatory jurisdiction over the administration and enforcement of ERP criteria pursuant to Part IV, Chapter 373, Florida Statutes, and Title 40E of the Florida Administrative Code. The Department of Environment Protection (DEP) has delegated certain authority to the District, including the authority to authorize an applicant to use sovereign submerged lands via a public easement within the District's geographic jurisdiction. The Project Construction of a new bridge over the St. Lucie River has been studied extensively by the Applicants for over twenty years. DOT has awarded the contract and nearly all of the right-of-way has been purchased. The Project will begin as soon as the remaining permits are acquired. The Project is fully funded through the American Recovery and Reinvestment Act of 2009 and County funding. The Project is located in the County and includes 62.06 acres of roadway bridge development and 12.45 acres of sovereign submerged lands. The Project begins on the west side of the St. Lucie River on County Road 714, approximately 1,300 feet west of Mapp Road in Palm City and ends on the east side of the St. Lucie River approximately 1,400 feet east of Kanner Highway (State Road 76) on Indian Street. It includes construction and operation of a surface water management system to serve the road and bridge project. The total length of the Project is approximately 1.96 miles (1.38 miles of roadway and 0.58 miles of bridge) while the total area is approximately 74.51 acres. After treatment, surface water runoff will discharge to the tidal South Fork of the St. Lucie River. The Project encompasses a bridge crossing the South Fork of the St. Lucie River and the Okeechobee Waterway. Both are classified as Class III waters. The bridge transitions from 4 to 6 lanes east of the Okeechobee Waterway and will require a 55-foot vertical clearance and a 200-foot horizontal clearance between the fender systems at the Okeechobee Waterway. The bridge will cross over a portion of Kiplinger Island owned and preserved by the County. A part of the island was donated to the County in 1993-1994 by The Kiplinger Washington Editors, Inc., and the Kiplinger Foundation, Inc. Audubon of Martin County owns another part of the island. The transfer of title to the County does not include any restriction on the use of the island for conservation purposes only. Documentation submitted at hearing refers to a "two hundred foot wide road right-of-way" easement that the bridge will cross and allows the County to designate where on the island parcel such an easement would be. Therefore, spanning the bridge over a portion of the island owned by the County is clearly permissible. The Project also includes the roadway transition and widening/reconstruction of (a) County Road 714 from the beginning of the Project to Mapp Road from 2-lane to a 4-lane divided roadway; (b) Southwest 36th Street from Mapp Road to the beginning of the bridge from a 2-lane rural roadway to a 4-lane divided roadway with wide roadway swales; and (c) Kanner Highway (along Indian Street) from a 4-lane to a 6-lane divided urban roadway. Drainage improvements on both sides of the St. Lucie River are associated with the roadway construction. DOT proposes to provide both on-site and off-site mitigation for wetland and surface waters impacts pursuant to a mitigation plan approved by the District. The ERP Permitting Criteria In order to obtain an ERP, an applicant must satisfy the conditions for issuance set forth in Florida Administrative Code Rules 40E-4.301 and 40E-4.302. Besides these rules, certain related BOR provisions which implement the rules must also be considered. The conditions for issuance primarily focus on water quality, water quantity, and environmental criteria and form the basis of the District's ERP permitting program. The parties have stipulated that the Project either complies with the following rule provisions or they are not applicable: Rules 40E-4.301(1)(a), (b), (g), (g), (h), and (k), and 40E- 4.302(1)(a)3. and 6. All other provisions remain at issue. Where conflicting evidence on these issues was submitted, the undersigned has resolved all evidentiary conflicts in favor of the Applicants and District. Based on the parties' Stipulation, the following provisions in Rule 40E-4.301(1) are in dispute and require an applicant to provide reasonable assurances that the construction, alteration, operation, maintenance, removal, or abandonment of a surface water management system: will not cause adverse impacts to existing surface water storage and conveyance capabilities; will not adversely impact the value of functions provided to fish and wildlife and listed species by wetlands and other surface waters; will not adversely affect the quality of receiving waters such that the water quality standards set forth in chapters 62- 4, 62-302, 62-520, 62-522, 62-550, F.A.C., including any anti-degradation provisions of paragraphs 62-4.242(1)(a) and (b), subsections 62-4.242(2) and (3), and rule 62-302.300, F.A.C., and any special standards for Outstanding Florida Waters and Outstanding National Resource Waters set forth in subsections 62-4.242(2) and (3), F.A.C., will be violated; will not cause adverse secondary impacts to the water resources; will be capable, based on generally accepted engineering and scientific principles, of being performed and of functioning as proposed; will be conducted by an entity with sufficient financial, legal and administrative capability to ensure that the activity will be undertaken in accordance with the terms and conditions of the permit, if issued; These disputed criteria are discussed separately below. Surface Water Storage and Conveyance Rule 40E-4.301(1)(c) requires that an applicant provide reasonable assurances that a proposed activity will not cause adverse impacts to existing surface water storage and conveyance capabilities. Through unrefuted evidence, this requirement was shown to be satisfied. The evidence also establishes that the surface water in and around the Project will actually improve if the Project is constructed as permitted. Further, it will create improved and upgraded surface water management and treatment in areas that now lack features such as swales, retention/detention ponds, curbs and gutters, and improve the overall surface water storage and conveyance capabilities of the Project and surrounding areas. In its current pre-development condition, flooding has occurred in certain areas adjacent to and within the Project area due to poor conveyance, low storage volume, and high tailwater conditions that result from high tides. The Project will remedy historic flooding issues in the Old Palm City area which lies adjacent to a portion of the Project alignment. Surface water runoff will be captured, controlled, and treated by a system of swales, weirs, and retention/detention facilities for pretreatment prior to discharging into the South Fork of the St. Lucie River. Reasonable assurances have been given that existing surface water storage and conveyance capabilities will not be adversely affected. Value of Functions to Fish, Wildlife, and Species Rule 40E-4.301(1)(d) requires that an applicant provide reasonable assurances that a proposed activity will not adversely impact the value of functions provided to fish and wildlife and listed species by wetlands and other surface waters. BOR Section 4.2.2 further implements this provision. For the following reasons, the rule and BOR have been satisfied. The evidence shows that the existing functions to fish and wildlife were assessed and analyzed by a number of federal and state fish and wildlife agencies. There were extensive review and site inspections by the District, DOT, United States Fish and Wildlife Service, United States Army Corps of Engineers, and National Marine Fisheries Commission to assess the existence of, and potential impact on, fish and wildlife that may result from the Project. These studies revealed that while portions of the South Fork of the St. Lucie River provide potential habitat for aquatic or wetland-dependent or threatened species of special concern, no nesting or roosting areas within the vicinity of the Project were observed. The evidence further supports a finding that "other surface waters" over and under the Project will not receive unacceptable impacts due to their current condition, the detrimental influences of Lake Okeechobee discharges, and tidal impacts. Many of the wetlands to be impacted by the Project were shown to have been impacted by historic activities, and they provide diminished functions to fish and wildlife. The wetland functions were assessed through the Uniform Mitigation Assessment Methodology (UMAM). The UMAM is a standardized procedure for assessing the functions provided by wetlands and other surface waters, the amount that those functions would be reduced by a proposed project, and the amount of mitigation necessary to offset that loss. Detailed UMAM assessments were prepared by the Applicants and the District. They demonstrate that while certain functional units will be lost, they will be fully offset by the proposed mitigation. No credible evidence to the contrary was presented. Water Quality of Receiving Waters Rule 40E-4.301(1)(e) requires an applicant to provide reasonable assurances that a project will not adversely affect the quality of receiving waters such that State water quality standards will be violated. BOR Section 4.2.4 implements this rule and requires that "reasonable assurances regarding water quality must be provided for both the short term and long term, addressing the proposed construction, . . . [and] operation of the system." The receiving water body is the South Fork of the St. Lucie River, which is designated as an impaired water body. The evidence establishes that the Applicants will avoid and minimize potential short-term impacts to water quality by using silt screens and turbidity barriers, and implementing other best management practices to contain turbidity during construction of the Project. They will also use a temporary trestle rather than barges in the shallow portions of the South Fork to avoid stirring up bottom sediments. Finally, a turbidity monitoring plan will be implemented during construction and dewatering activities for all in-water work. All of these construction techniques will minimize potential impacts during construction. The evidence further establishes that water quality standards will not be violated as a result of the Project. In fact, in some cases water quality will be enhanced due to the installation and maintenance of new or upgraded surface water management features in areas where they do not exist or have fallen into disrepair. Over the long term, the Project is expected to have a beneficial effect on water quality. By improving existing surface water management and adding new surface water treatment features, the Project will provide net improvement to water quality. Wetland Delineation and Impacts The Project includes unavoidable impacts to wetlands and other surface waters. A total of 18.53 acres of wetlands and other surface waters within the Project site will be impacted by the Project, including 3.83 acres of wetlands that will be directly impacted and 14.7 acres of wetlands and other surface waters that will be secondarily impacted. The delineated wetlands are depicted in the Staff Report as wetlands 2a, 19a, 19b, 22, 25-29, 30a, 30b, and 30c, with each having a detailed UMAM assessment of its values and condition. (Impacts to wetland 25 are not included in this Project because they were accounted for in a separate permit proceeding.) Using a conservative assessment and set of assumptions, the District determined that, with the exception of wetlands 19a, 19b, 22, and 27, all wetlands would be impacted by the Project. However, the wetlands that would be impacted suffer from varying historical adverse impacts that have compromised the functions and values they provide to fish, wildlife, and species. This is due to their proximity to urban development, vegetative connectivity, size, historic impacts, altered hydroperiod, and invasive plant species. Likewise, even though the wetlands to be impacted on Kiplinger Island provide certain resting and feeding functions for birds, the value of these functions is comparatively lower than other wetlands due to the presence of invasive species and lack of management. The preponderance of the evidence supports a finding that the Applicants provided reasonable assurances that the Project will not cause adverse impacts to fish, wildlife, or listed species. See Fla. Admin. Code R. 40E-4.301(1)(d). Secondary Impacts Rule 40E-4.301(1)(f) and BOR Sections 4.1.1(f) and 4.2.7. require a demonstration that the proposed activities will not cause adverse secondary impacts to the water resources, both from a wetlands and water quality standpoint. Secondary impacts are those that occur outside the footprint of the project, but which are very closely linked and causally related to the activity to be permitted. De minimis or remotely-related secondary impacts, however, are not considered unacceptable. See § 4.2.7.(a). There will be secondary impacts to 6.83 acres of freshwater wetlands and 7.87 acres of mangroves, or a total of 14.7 acres. To address these secondary impacts, the Applicants have established extensive secondary impact zones and buffers along the Project alignment, which were based in part on District experience with other road projects and another nearby proposed bridge project in an area where a State Preserve is located. While Petitioners' expert contended that a 250-foot buffer on both sides of the roadway's 200-foot right-of-way was insufficient to address secondary impacts to birds (who the expert opines may fly into the bridge or moving vehicles), the greater weight of evidence shows that bird mortality can be avoided and mitigated through various measures incorporated into the Project. Further, the bird mortality studies used by the expert involved significantly different projects and designs, and in some cases involved projects outside the United States with different species concerned. Engineering and Scientific Principles Rule 40E-301(1)(i) requires that an applicant give reasonable assurance that a project "be capable, based on generally accepted engineering and scientific principles, of being performed and of functioning as proposed." Unrefuted evidence establishes that the proposed system will function and be maintained as proposed. Financial, Legal and Administrative Capability Rule 40E-4.301(1)(j) requires that an applicant give reasonable assurance that it has the financial, legal, and administrative capability to ensure that the activity will be undertaken in accordance with the terms of the permit. The evidence supports a finding that Applicants have complied with this requirement. Elimination and Reduction of Impacts Before establishing a mitigation plan, Rule 40E- 4.301(3) requires that an applicant implement practicable design modifications to eliminate and reduce wetland and other surface water impacts. In this case, there are unavoidable, temporary wetland impacts associated with the construction of the Project, as well as unavoidable wetland impacts for direct (project footprint), secondary, and cumulative impacts of the Project. The record shows that the Applicants have undertaken extensive efforts to eliminate and reduce wetland and other surface water impacts of the Project. For example, DOT examined and assessed several innovative construction techniques and bridge designs to eliminate and avoid wetland impacts. To eliminate and reduce temporary impacts occurring during construction, DOT has reduced the effect of scour on the pier foundation and reduced the depth of the footing to minimize the amount of excavation on the mangrove island. Also, during construction, the contractor is prohibited from using the 200- foot right-of-way on the mangrove island for staging or stockpiling of construction materials or equipment. The majority of the bridge width has been reduced to eliminate and avoid impacts. Also, the Project's alignment was adjusted to the north to avoid impacts to a tidal creek. Reasonable assurances have been given that all practicable design and project alternatives to the construction and placement of the Project were assessed with no practicable alternatives. Public Interest Test Besides complying with the requirements of Rule 40E- 4.301, an applicant must also address the seven factors in Rule 40E-4.302(1)(a)1.-7., which comprise the so-called "public interest" test. See also § 373.414(1)(a), Fla. Stat. In interpreting the seven factors, the District balances the potential positive and negative effects of a project to determine if it meets the public interest criteria. Because Petitioners agree that factors 3 and 6 of the rule are not at issue, only the remaining five factors will be considered. For the following reasons, the Project is positive when the criteria are weighed and balanced, and therefore the Project is not contrary to the public interest. Public Health, Safety, and Welfare The Applicants have provided reasonable assurance that the Project will not affect public health, safety, and welfare. Specifically, it will benefit the health, safety, and welfare of the citizens by improving traffic conditions and congestion, emergency and hurricane evacuation, and access to medical facilities. In terms of safety, navigation markers are included as part of the Project for safe boating by the public. See Fla. Admin. Code R. 40E-4.302(1)(a)1. Conservation of Fish and Wildlife The activity will not adversely affect the conservation of fish and wildlife, including endangered or threatened species, or their habitats. The mitigation projects will offset any impacts to fish and wildlife, improve the abundance and diversity of fish and wildlife on Kiplinger Island, create mangrove habitat, and add to the marine productivity in the area by enhancing water quality. See Fla. Admin. Code R. 40E-302(1)(a)2. Fishing or Recreational Values The Project has features that allow for pedestrian and bicycle utilization and observation areas which should enhance recreational values. The Old Palm Bridge, approximately one mile north of the Project, has had no adverse impact on the fishing recreation along the South Fork of the St. Lucie River. Navigation will not be affected due to the height and design of the new bridge. Finally, the bridge is expected to be a destination for boating, kayaking, fishing, and bird watching. See Fla. Admin. Code R. 40E-4.302(1)(a)4. Whether the Activity is of a Permanent Nature The parties have stipulated that the Project is permanent in nature. No future activities or future phases of the project are contemplated. Temporary and permanent impacts are all being fully mitigated. See Fla. Admin. Code R. 40E- 4.302(1)(a)5. Values of Functions Being Performed in Affected Areas Due to historic impacts to the areas affected by the Project, the current condition is degraded and the relative value of functions is minimal. Although Kiplinger Island will have temporary impacts, that island is subject to exotic species and has no recreational use or access by boaters or members of the public. The Applicants propose mitigation which will improve and enhance these wetland functions and values in the areas. See Fla. Admin. Code R. 40E-4.302(1)(a)7. Summary The evidence supports a finding that the Project is positive as to whether it will affect the public health, safety, welfare, or property of others; that the Project is neutral with respect to navigation, erosion and shoaling, and water flow, as well as to historical and archaeological concerns; and that the Project is positive as to conservation of fish, wildlife, recreational values, marine productivity, permanency, and current values and functions. When weighed and balanced, the Project is not contrary to the public interest. Cumulative Impacts Rule 40E-4.302(1)(b) requires that an applicant give reasonable assurance that a project will not cause unacceptable cumulative impacts upon wetlands and other surface waters as set forth in BOR Sections 4.28 through 4.2.8.2. Cumulative impacts are the summation of unmitigated wetland impacts within a drainage basin. An analysis is geographically based upon the drainage basins described in BOR Figure 4.4.1. Petitioners' contention that Figure 4.4.1 is inaccurate or not representative of the basin in which the Project is located has been rejected. In this case, the North St. Lucie Basin was used. To assess and quantify any potential unacceptable cumulative impacts in the basin, and supplement the analyses performed by the Applicants, the District prepared a Basin Map that depicted all the existing and permitted wetland impacts as well as those wetlands under some form of public ownership and/or subject to conservation restrictions or easements. The District's analysis found that the wetlands to be mitigated were of poor quality and provided minimal wildlife and water quality functions. Cumulative impacts from the Project to wetlands within the basin resulted in approximately a four percent loss basin-wide. This is an acceptable adverse cumulative impact. Therefore, the Project will not result in unacceptable cumulative impacts. Mitigation Adverse impacts to wetlands caused by a proposed activity must be offset by mitigation measures. See § 4.3. These may include on-site mitigation, off-site mitigation, off- site regional mitigation, or the purchase of mitigation credits from mitigation banks. The proposed mitigation must offset direct, secondary, and cumulative impacts to the values and functions of the wetlands impacted by the proposed activity. The ability to provide on-site mitigation for a DOT linear transportation project such as a bridge is limited and in this case consists of the creation of mangrove and other wetlands between the realigned St. Lucie Shores Boulevard and the west shore of the St. Lucie River, north and south of the proposed bridge crossing. BOR Section 4.3.1.2 specifically recognizes this limitation and allows off-site mitigation for linear projects that cannot effectively implement on-site mitigation requirements due to right-of-way constraints. Off-site mitigation will offset the majority of the wetland impacts. Because no single on-site or off-site location within the basin was available to provide mitigation necessary to offset all of the Project's impacts, DOT proposed off-site mitigation at two established and functioning mitigation areas known as Dupuis State Reserve (Dupuis), which is managed by the County and for which DOT has available mitigation credits, and the County's Estuarine Mitigation Site, a/k/a Florida Oceanographic Society (FOS) located on Hutchinson Island. Dupuis is outside the North St. Lucie Basin and was selected to offset direct and secondary impacts to freshwater wetlands. That site meets the ERP criteria in using it for this project. The FOS is within the North St. Lucie Basin and was selected to offset direct and secondary impacts to estuarine wetlands. Like Dupuis, this site also meets the ERP criteria for the project. The preponderance of the evidence establishes that the on-site and off-site mitigation projects fully offset any and all project impacts, and in most instances before the impacts will actually occur. Sovereign Submerged Lands and Heightened Public Concern Chapter 18-21 applies to requests for authorization to use sovereign submerged lands. The management policies, standards, and criteria used to determine whether to approve or deny a request are found in Rule 18-21.004. For purposes of granting a public easement to the Applicants, the District determined that the Project is not contrary to the public interest and that all requirements of the rule were satisfied. This determination was not disputed. The only issue raised by Petitioners concerning the use of submerged lands is whether the application should have been treated as one of "heightened public concern." See Fla. Admin. Code R. 18-21.0051(5). If a project falls within the purview of that rule, the Board of Trustees of the Internal Improvement Trust Fund (Board), rather than the District, must review and approve the application to use submerged lands. Review by the Board is appropriate whenever a proposed activity is reasonably expected to result in a heightened public concern because of its potential effect on the environment, natural resources, or controversial nature or location. Id. In accordance with established protocol, the ERP application was sent by the District to DEP's review panel in Tallahassee (acting as the Board's staff) to determine whether the Project required review by the Board. The panel concluded that the Project did not rise to the level of heightened public concern. Evidence by Petitioners that "many people" attended meetings and workshops concerning the Project over the last 20 years or so is insufficient to trigger the rule. Significantly, except for general project objections lodged by Petitioners and Audubon of Martin County, which did not include an objection to an easement, no adjacent property owner or other member of the public voiced objections to the construction of a new bridge. Revised Staff Report On October 20, 2010, the District issued a Revised Staff Report that merely corrected administrative errors or information that had been previously submitted to the District. Contrary to Petitioners' assertion, it did not constitute a material change to the earlier agency action either individually or cumulatively. Therefore, it was properly considered in this proceeding. Letter Modifications The Letter Modifications were used as a mechanism to capture minor alterations made to previously issued permits for Kanner Highway and Indian Street. Neither Letter Modification is significant in terms of water quality, water quantity, or environmental impacts. Both were issued in accordance with District rules and should be approved.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the South Florida Water Management District enter a final order granting Application Nos. 091021-8, 100316-7, and 100316-6. DONE AND ENTERED this 28th day of December, 2010, in Tallahassee, Leon County, Florida. S D. R. ALEXANDER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 28th day of December, 2010. COPIES FURNISHED: Carol Ann Wehle, Executive Director South Florida Water Management District 3301 Gun Club Road West Palm Beach, Florida 33406-3007 Jeffrey W. Appel, Esquire Ray Quinney and Nebeker, P.C. 36 South State Street, Suite 1400 Salt Lake City, Florida 84111-1401 Bruce R. Conroy, Esquire Department of Transportation 605 Suwannee Street Mail Station 58 Tallahassee, Florida 32399-0458 David A. Acton, Esquire Senior Assistant County Attorney Martin County Administrative Center 2401 Southeast Monterey Road Stuart, Florida 34996-3397 John J. Fumero, Esquire Rose, Sundstrom & Bentley, P.A. 950 Peninsula Corporate Circle Suite 2020 Boca Raton, Florida 33487-1389 Keith L. Williams, Esquire South Florida Water Management District 3301 Gun Club Road Mail Stop 1410 West Palm Beach, Florida 33406-3007
The Issue The issue is whether the applicant for an Environmental Resource Permit ("ERP"), the City of Deltona ("City" or "Applicant"), has provided reasonable assurance that the system proposed complies with the water quantity, environmental, and water quality criteria of the St. Johns River Water Management District's ("District") ERP regulations set forth in Florida Administrative Code Chapter 40C-4, and the Applicant's Handbook: Management and Storage of Surface Waters (2005).
Findings Of Fact The District is a special taxing district created by Chapter 373, Florida Statutes, charged with the duty to prevent harm to the water resources of the District, and to administer and enforce Chapter 373, Florida Statutes, and the rules promulgated thereunder. The City of Deltona is a municipal government established under the provisions of Chapter 165, Florida Statutes. The Lake Theresa Basin is comprised primarily of a system of interconnected lakes extending from Lake Macy in the City of Lake Helen to the Butler Chain of Lakes (Lake Butler and Lake Doyle). The Lake Theresa Basin is land-locked and does not have a natural outfall to Lake Monroe and the St. Johns River. In 2003, after an extended period of above-normal rainfall in the Deltona area, the lakes within the land-locked Lake Theresa Basin staged to extremely high elevations that resulted in standing water in residential yards, and rendered some septic systems inoperable. Lake levels within the Lake Theresa Basin continued to rise and were in danger of rising above the finished floor elevations of some residences within the basin. On March 25, 2003, the District issued an Emergency Order (F.O.R. No. 2003-38) authorizing the construction and short-term operation of the Lake Doyle and Lake Bethel Emergency Overflow Interconnection. Since wetland and surface water impacts would occur, the Emergency Order required the City of Deltona to obtain an ERP for the system. The project area is 4.1 acres, and the system consists of a variable water structure on the west shore of Lake Doyle connected to a series of pipes, swales, water control structures, and wetland systems which outfall to a finger canal of Lake Bethel, with ultimate discharge to Lake Monroe and the St. Johns River. The first segment of the system extends downstream from the weir structure on the west shore of Lake Doyle via a pipe entrenched in the upland berm of the Sheryl Drive right-of-way. The pipe passes under Doyle Road and through xeric pine-oak uplands to the northeast shore of a large (approximately 15 acres) deepwater marsh. Water flows south through the deepwater marsh where it outfalls through four pipes at Ledford Drive. Two of the four pipes are overflow structures, controlled by canal gates. The pipes at Ledford Drive discharge into a ditch and into a large (greater than 20 acres) shallow bay swamp. The south end of the bay swamp is defined (and somewhat impounded) by a 19th Century railroad grade. Water flows through the bay swamp where it outfalls through five pipes at the railroad grade. Three of the five pipes are overflow structures, controlled by channel boards. The pipes at the railroad grade discharge to a 1500-foot long finger canal that was dug some time during the period 1940-1972 from the north central shore of Lake Bethel. The overflow interconnection system has three locations whereby the system can be shut down: 1) Lake Doyle--a control weir, controlled by three sluice gates; 2) Ledford Drive--two thirty-inch reinforced concrete pipes, controlled by canal gates; and 3) railroad grade--three thirty-inch reinforced concrete pipes, controlled by channel boards (collectively referred to as "Overflow Structures"). The Overflow Structures are designed to carry the discharge of water from Lake Doyle to Lake Bethel. With the Overflow Structures closed the system returns to pre-construction characteristics, meaning there will be no increase or decrease in the quantity or quality of water throughout the path of the system as a result of the project. An unequivocal condition of the permit is that the system would operate with all of the Overflow Structures closed. As an added assurance, the City proposes to place a brick and mortar plug in the Lake Doyle weir structure outfall pipe to prevent any discharge from the weir. The City has submitted to the District preliminary plans for a future phase in which the system would be modified for the purpose of alleviating high water levels within the Lake Theresa Basin when the water level in Lake Doyle rises above an elevation of 24.5 feet. The District shall require a separate permit application to be submitted for such future plans. Petitioner, Barbara Ash, has lived on Lake Theresa for 19 years. Ms. Ash lives upstream from the area of the weir that will be plugged in accordance with the ERP. She does not trust either the City of Deltona to comply with or the District to enforce the conditions of the ERP applied for by the City. Petitioner, Barbara Ash, also served as the qualified representative for Petitioners, Francell Frei, Bernard J. and Virginia Patterson, and Ted and Carol Sullivan. Ms. Ash represented that Ms. Frei has lived on Lake Theresa for 12 years, and both the Pattersons and the Sullivans live on Lake Louise, which is within the area of concern in this proceeding. Petitioner, Diana Bauer, has lived on Lake Theresa since February 2004. She fears that the lake will become too dry if the system is allowed to flow. She also believes the wildlife will be adversely affected if the water levels are too low since many species need a swampy or wet environment to thrive. She fears her property value will decrease as a result of the approval of the ERP. She also does not trust either the City to comply with or the District to enforce the conditions of the ERP. Petitioner, Howard Ehmer, lives two to three hundred yards down Lake Theresa from Ms. Bauer. He is concerned about the lake bed being too dry and attracting people on all terrain vehicles who enjoy driving around the lake bottom. He is concerned about his property value decreasing if the lake bed is dry. Further, when the lake level is too low, people cannot enjoy water skiing, boating, and fishing on Lake Theresa. Petitioner, Phillip Lott, a Florida native, has also owned and lived on property abutting Lake Theresa since 1995. Mr. Lott has a Ph.D. in plant ecology, and M.P.A. in coastal zone studies, an M.B.A. in international business, and a B.S. in environmental resource management and planning. Mr. Lott has been well acquainted with the water levels on Lake Theresa for many years. Based upon his personal observations of the lake systems in the Deltona area over the years, Mr. Lott has seen levels fluctuate greatly based upon periods of heavy and light rainfall. Mr. Lott is concerned that the District will permit the City to open the weir to let water flow through the system and cause flooding in some areas and low water levels in other areas. He fears that the District will allow the water to flow and upset the environmental balance, but he admits that this ERP application is for a closed system that will not allow the water to flow as he fears. Mr. Lott similarly does not trust the City to comply with and the District to enforce the conditions of the ERP. Petitioners, James E. and Alicia M. Peake, who were represented by Steven L. Spratt at hearing as their qualified representative, live on Lake Louise, which is interconnected with the Lake Theresa basin. The Peakes are concerned that if the level of Lake Louise drops below 21 feet, nine inches, they will not be able to use the boat launch ramps on the lake. Petitioner, Steven L. Spratt, also lives on Lake Louise, and is concerned about the water levels becoming so low that he cannot use the boat launch on the lake. He has lived on the lake since 2000, and remembers when the water level was extremely low. He fears that approval of the ERP in this case will result in low levels of water once again. Petitioner, Gloria Benoit, has live on Lake Theresa for two years. She also enjoys watching recreational activities on the lake, and feels that approval of the ERP will devalue her lakefront property. Ms. Benoit appeared at the first day of the hearing, but offered no testimony on her behalf. J. Christy Wilson, Esquire, appeared prior to the final hearing as counsel of record for Petitioners, Steven E. Larimer, Kathleen Larimer, and Helen Rose Farrow. Neither Ms. Wilson nor any of the three Petitioners she represented appeared at any time during the hearing, filed any pleadings seeking to excuse themselves from appearing at the final hearing, or offered any evidence, testimony, pre- or post- hearing submittals. Petitioner, Gary Jensen, did not appear at hearing, did not file any pleadings or papers seeking to be excused from appearing at the final hearing, and did not offer any evidence, testimony, pre- or post-hearing submittals. Both the City and the District recognize that areas downstream from the project site, such as Stone Island and Sanford, have experienced flooding in the past in time of high amounts of rainfall. The system proposed by the City for this ERP will operate with the overflow structures closed and a brick and mortar plug in the outfall pipe to prevent water flow from Lake Doyle to Lake Bethel. So long as the overflow structures are closed, the system will mimic pre-construction flow patterns, with no increase in volume flowing downstream. The District has considered the environment in its proposed approval of the ERP. The area abutting the project is little urbanized and provides good aquatic and emergent marsh habitat. With the exception of the western shore area of the deepwater marsh ("west marsh area"), the bay swamp and remaining deepwater marsh area have good ecological value. In the 1940's, the west marsh area was incorporated into the drainage system of a poultry farm that occupied the site. This area apparently suffered increased nutrient influxes and sedimentation that contributed to a proliferation of floating mats of aquatic plants and organic debris. These tussocks reduced the deepwater marsh's open water and diminished the historical marsh habitat. Water under the tussocks is typically anoxic owing to total shading by tussocks and reduced water circulation. Thick, soft, anaerobic muck has accumulated under the matted vegetation. Exotic shrubs (primrose willow Ludwigia peruvania) and other plants (cattails Typha spp.) dominate the tussocks. The construction of the project, from the 2003 Emergency Order, resulted in adverse impacts to 1.3 acres of wetlands having moderately high- to high ecological value and 0.2 acres of other surface waters. The 0.2 acre impact to other surface waters was to the lake bottom and the shoreline of Lake Doyle where the weir structure was installed. The 0.3 acres of wetland impacts occurred at the upper end of the deepwater marsh where the pipe was installed. The largest wetland impact (1.0 acre) was to the bay swamp. The bay swamp is a shallow body dominated by low hummocks and pools connected inefficiently by shallow braided channels and one acre is filled with a 1-2 foot layer of sediment following swamp channelization. Disturbance plants (e.g., primrose willow, Ludwigia peruvania, and elderberry Sambucus Canadensis) now colonize the sediment plume. Pursuant to the District's elimination and reduction criteria, the applicant must implement practicable design modifications, which would reduce or eliminate adverse impacts to wetlands and other surface waters. A proposed modification, which is not technically capable of being done, is not economically viable, or which adversely affects public safety through endangerment of lives or property is not considered "practicable." The City reduced and/or eliminated the impacts to the lake bottom and shoreline of Lake Doyle and deepwater marsh, to the extent practicable. The impacts were the minimum necessary to install the weir structure and pipe for the system; the weir structure and pipe were carefully installed on the edges of the wetland and surface water systems, resulting in a minimum amount of grading and disturbance. To compensate for the loss of 1.3 acres of wetlands and 0.2 acres of other surface waters, the City proposes to preserve a total of 27.5 acres of wetlands, bay swamp, marsh, and contiguous uplands. Included in this 27.5 acres are 6.4 acres of the west marsh, which are to be restored. The parties stipulated that the mitigation plan would adequately compensate for losses of ecological function (e.g. wildlife habitat and biodiversity, etc.) resulting from the project. Water quality is a concern for the District. Lake Monroe is included on the Florida Department of Environmental Protection's verified list of impaired water bodies for nitrogen, phosphorous, and dissolved oxygen. Water quality data for Lake Monroe indicate the lake has experienced high levels of nitrogen and phosphorous and low levels of dissolved oxygen. Prior to construction of the project, there was no natural outfall from the Lake Theresa Basin to Lake Monroe and therefore no contribution from this basin to nitrogen and phosphorous loadings to Lake Monroe. Lake Colby, Three Island Lakes (a/k/a Lake Sixma), and the Savannah are surface waters within the Lake Theresa Basin for which minimum levels have been adopted pursuant to Florida Administrative Code Chapter 40C-8. The system will operate with the overflow structures closed and a brick and mortar plug in the outfall pipe to prevent water flow from Lake Doyle to Lake Bethel, resulting in no outfall from the Theresa Basin to Lake Monroe. Minimum flows established for surface waters within the Lake Theresa Basin will not be adversely impacted. Under the first part of the secondary impact test, the City must provide reasonable assurance that the secondary impacts from construction, alteration, and intended or reasonable expected use of the project will not adversely affect the functions of adjacent wetlands or surface waters. The system is designed as a low intensity project. As proposed, little activity and maintenance are expected in the project site area. The reasonably expected use of the system will not cause adverse impacts to the functions of the wetlands and other surface waters. None of the wetland areas adjacent to uplands are used by listed species for nesting or denning. In its pre-construction state, the project area did not cause or contribute to state water quality violations. Under the second part of the secondary impact test, the City must provide reasonable assurance that the construction, alteration, and intended or reasonably expected uses of the system will not adversely affect the ecological value of the uplands to aquatic or wetland dependent species for enabling existing nesting or denning by these species. There are no listed threatened or endangered species within the project site area. Under the third part of the secondary impact test, and as part of the public interest test, the District must consider any other relevant activities that are closely linked and causally related to any proposed dredging or filling which will cause impacts to significant historical and archaeological resources. When making this determination, the District is required, by rule, to consult with the Division of Historical Resources. The Division of Historical Resources indicated that no historical or archaeological resources are likely present on the site. No impacts to significant historical and archaeological resources are expected. Under the fourth part of the secondary impact test, the City must demonstrate that certain additional activities and future phases of a project will not result in adverse impacts to the functions of wetlands or water quality violations. The City has submitted to the District preliminary plans for a future phase in which the system would be modified for the purpose of alleviating high water levels within the Lake Theresa Basin when the level in Lake Doyle rises above an elevation of 24.5 feet. Based upon the plans and calculations submitted, the proposed future phase, without additional measures, could result in minor increases in the loadings of nitrogen and phosphorous to Lake Monroe. Lake Monroe is included on the Florida Department of Environmental Protection's verified list of impaired water bodies due to water quality data indicating the lake has experienced high levels of nitrogen and phosphorous, and low levels of dissolved oxygen. Under this potential future phase, there would be an outfall from the Lake Theresa Basin to Lake Monroe. To address the impact on water quality of this potential future phase, the City has submitted a loading reduction plan for nitrogen, phosphorous, and dissolved oxygen. The plan includes compensating treatment to fully offset the potential increased nutrient loadings to Lake Monroe. Specifically, the loading reduction plan includes: Construction and operation of compensating treatment systems to fully offset anticipated increased nutrient loadings to Lake Monroe. Weekly water quality monitoring of the discharge from Lake Doyle for total phosphorous and total nitrogen. A requirement that the overflow structure be closed if the total phosphorous level reaches 0.18 mg/l or higher or the total nitrogen level reaches 1.2 mg/l or higher in any given week and will remain closed until levels fall below those limits. The implementation of these water quality mitigation measures will result in a net improvement of the water quality in Lake Monroe for nitrogen, phosphorous, or dissolved oxygen. The future phase was conceptually evaluated by the District for impacts to wetland functions. The future phase as proposed could result in adverse impacts to wetland functions. Operation of the system with the overflow structures open could impact the bay swamp and deepwater marsh. The City has demonstrated that any adverse impacts could be offset through mitigation. Based upon the information provided by the City and general engineering principles, the system is capable of functioning as proposed. The City of Deltona will be responsible for the operation, maintenance, and repair of the surface waster management system. A local government is an acceptable operation and maintenance entity under District rules. The public interest test has seven criteria. The public interest test requires the District to evaluate only those parts of the project actually located in, on, or over surface waters or wetlands, to determine whether a factor is positive, neutral, or negative, and then to balance these factors against each other. The seven factors are as follows: the public health, safety, or welfare of others; conservation of fish and wildlife and their habitats; fishing, recreational value, and marine productivity; temporary or permanent nature; 5) navigation, water flow, erosion, and shoaling; 6) the current condition and relative value of functions; and 7) historical and archaeological resources. There are no identified environmental hazards or improvements to public health and safety. The District does not consider impacts to property values. To offset any adverse impacts to fish and wildlife and their habitats, the City has proposed mitigation. The areas of the project in, on, or over wetlands do not provide recreational opportunities. Construction and operation of the project located in, on, or over wetlands will be permanent in nature. Construction and operation of the project located in, on, or over wetlands will not cause shoaling, and does not provide navigational opportunities. The mitigation will offset the relative value of functions performed by areas affected by the proposed project. No historical or archaeological resources are likely on the site of the project. The mitigation of the project is located within the same drainage basin as the project and offsets the adverse impacts. The project is not expected to cause unacceptable cumulative impacts.
Recommendation Based upon the Findings of Fact and Conclusions of Law, it is RECOMMENDED that a Final Order be entered granting the City of Deltona's application for an environmental resource permit with the conditions set forth in the Technical Staff Report, and dismissing the Petitions for Formal Administrative Hearing filed by Gary Jensen in Case No. 04-2405, and by Steven E. Larimer, Kathleen Larimer, and Helen Rose Farrow in Case No. 04-3048. DONE AND ENTERED this 27th day of May, 2005, in Tallahassee, Leon County, Florida. S ROBERT S. COHEN Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 27th day of May, 2005. COPIES FURNISHED: George Trovato, Esquire City of Deltona 2345 Providence Boulevard Deltona, Florida 32725 Diana E. Bauer 1324 Tartan Avenue Deltona, Florida 32738 Barbara Ash, Qualified Representative 943 South Dean Circle Deltona, Florida 32738-6801 Phillip Lott 948 North Watt Circle Deltona, Florida Howard Ehmer Nina Ehmer 32738-7919 1081 Anza Court Deltona, Florida 32738 Francell Frei 1080 Peak Circle Deltona, Florida 32738 Bernard T. Patterson Virginia T. Patterson 2518 Sheffield Drive Deltona, Florida 32738 Kealey A. West, Esquire St. Johns River Water Management District 4049 Reid Street Palatka, Florida 32177 J. Christy Wilson, Esquire Wilson, Garber & Small, P.A. 437 North Magnolia Avenue Orlando, Florida 32801 Gloria Benoit 1300 Tartan Avenue Deltona, Florida 32738 Gary Jensen 1298 Tartan Avenue Deltona, Florida 32738 James E. Peake Alicia M. Peake 2442 Weatherford Drive Deltona, Florida 32738 Steven L. Spratt 2492 Weatherford Drive Deltona, Florida 32738 Ted Sullivan 1489 Timbercrest Drive Deltona, Florida 32738 Kirby Green, Executive Director St. Johns River Water Management District 4049 Reid Street Palatka, Florida 32177
The Issue The ultimate issue to be addressed in this proceeding is whether the Applicants should be granted a dredge and fill permit. Petitioner contends that the Applicants have failed to provide reasonable assurances that the short-term and long-term effects of their proposed activities will not result in violations of the Department's water quality standards for both surface water and groundwater. The Applicants and the Department contend that reasonable assurances have been provided.
Findings Of Fact The Applicants are the owners of a 1,248-acre parcel of land located at the intersection of State Road 710 and State Road 711 in northern Palm Beach County, Florida. The Applicants are proposing to develop an industrial park known as "Palm Beach Park of Commerce" (PBPC). PBPC will provide sites for tenants to carry on various commercial and industrial activities. In order to prepare the site for development, the Applicants have designed a surface water management system. In order to develop the system, the Applicants must conduct dredging and filling activities in areas where the Department of Environmental Regulation has permitting jurisdiction. The Petitioner is an association of home owners within a single family residential development known as "Caloosa." The development is located to the southeast of the proposed PBPC. Surface and ground water flows from the PBPC site are toward Caloosa. Residents of Caloosa and members of the Petitioner are entirely dependent on private individual wells for their drinking water. The surficial aquifer is the only viable source of drinking water. The proposed PBPC surface water management system would allow water to drain from the site into an excavated canal which would essentially follow the perimeter of the site. The canal would discharge at the southeast corner of the site into the Caloosa Canal, which runs through the Caloosa residential development. The Caloosa Canal is designated as a Class III water body. The Caloosa Canal drains into the "C-18 Canal," which is maintained by the South Florida Water Management District. The point at which the Caloosa Canal discharges into the C-18 Canal is approximately 2.4 miles from the PBPC site. The C-18 Canal is designated as a Class I water body. The C-18 Canal ultimately discharges into the Loxahatchee River Basin, a Class II water body, which is located approximately 12.9 miles from the PBPC site. It is possible that during some periods of the year, water from the PBPC site would ultimately find its way to the Jonathan Dickinson park, where water has been designated as "outstanding Florida waters." It is approximately 13.2 miles from the PBPC site to the Jonathan Dickinson Park. The PBPC site is a high, marginal, stressed Everglades system. It is a prairie or pine flatwood area. During periods of heavy rainfall, water covers most of the site. During dry periods, there is standing water only in depressions. Approximately 200 acres of the site are inundated with water during a sufficient portion of the year to support predominantly wetland vegetation. Approximately 24 acres of the wetlands on the site are directly connected to drainage ditches that presently rim the site. The ditches are connected to the Caloosa Canal so that these 24 acres are ultimately connected through canal systems to the Loxahatchee River. These wetland areas, which will be hereafter referenced as "jurisdictional wetlands," are the only wetland areas other than the existing drainage ditches over which the Department of Environmental Regulation asserts jurisdiction under its Rule 17-4.28, Florida Administrative Code. As a part of its surface water management system, the Applicants propose to maintain 133.7 acres of the wetlands on the site in their natural condition. These wetland areas would be incorporated into the surface water management system so that surface water would flow into the wetlands, then through culverts or drainage ditches into the perimeter canal. The remaining wetlands on the site, including all of the "jurisdictional wetlands," would be filled. The wetlands on the PBPC site perform a significant water quality function. The wetlands serve as a filtration system. Wetland vegetation removes nutrients and turbidity from surface water before it is discharged into the canals and ultimately into the Loxahatchee River. The wetlands that the Applicants propose to preserve on the site would continue to perform that beneficial function. In order to mitigate the loss of the wetlands that would be filled, the Applicants propose to create approximately 85 acres of new wetland areas and to vegetate these areas. These artificially created wetlands, if properly constructed, vegetated and maintained, would perform the same beneficial functions as the natural wetland communities. The Applicants have proposed to introduce several safeguards into their water management system to assure that the quality of surface and ground water in the area will not be adversely impacted. The preservation of 133 acres of natural wetland areas and the creation of approximately 85 acres of artificial wetland areas is one of these safeguards. In addition, the surface water management system includes the creation of swales around water bodies so that the first one inch of stormwater runoff on the site will not drain directly into surface water bodies. By retaining the first one inch of runoff, pollutants contained in stormwater runoff will be retained on the site and will not enter surface or ground waters. Each commercial or industrial site at PBPC will be required to retain an additional one inch of stormwater runoff on the individual site. This will serve to filter pollutants out of stormwater runoff even before the runoff reaches the overall surface water management system in which one inch of runoff will also be retained on site. The Applicants have also agreed to establish a surface water quality management program to prohibit the discharge of any industrial waste into the surface water management system and to have the surface water management system maintained by the Northern Palm Beach Water Control District. There are further safeguards proposed by the Applicants. The Applicants have agreed to prohibit the most potentially hazardous industrial activities from being undertaken on the site. Applicants have also agreed to require each individual site plan to be reviewed by local government, the South Florida Water Management District, and the Department of Environmental Regulation so that potential water quality problems connected with site-specific uses can be identified and, if necessary, prohibited. The Applicants have agreed to establish an environmental liaison officer whose function will be to monitor all development on the site and report routinely to local government, the South Florida Water Management District, and the Department of Environmental Regulation regarding environmental issues. In order that any potential groundwater pollution can be detected and, if necessary, steps taken to remove pollutants from the groundwater, the Applicants have agreed to establish well- monitoring systems for the project as a whole and for individual sites. Individual site plans have not yet been formulated. It is not practical or possible to design water monitoring programs for the individual sites at this time. Once the nature of activities at a site are known, monitoring programs can be effectively set up and maintained. In the event that surface or ground water contamination occurs, it can be detected through monitoring programs, and the contaminants can be removed. The Applicants have provided reasonable assurance that the short-term and long-term effects of the construction of the PBPC water management system will not result in violations of the Department's water quality standards for surface or ground water. By use of turbidity screens during construction, short-term impacts will be negligible. Absent any construction on the site beyond the creation of the surface water management system, it is likely that the quality of water leaving the PBPC site will be as good or better than at present. Since the Applicants have not yet located tenants or made individual site plans for commercial and industrial activities within PBPC, it is not possible to determine if some specific activity in the future could operate to cause violations of the Department's water quality standards. In order that there be such assurances, the Applicants have agreed to subject individual site plans to review by local government, the South Florida Water Management District, and the Department of Environmental Regulation. In the event that a future tenant is not able to provide required assurances, the use can and should be prohibited, and can be prohibited by regulatory agencies as a condition of permits issued to the Applicants. Water quality violations presently occur in the Caloosa Canal and the C-18 Canal. The safeguards proposed by Applicants reasonably assure that the implementation of the proposed water management system will not exacerbate or cotribute to these violations. There is approximately an 11-square-mile area which drains into the Caloosa Canal through the outfall at the southeast corner of the PBPC site. The PBPC site constitutes approximately two square miles of this area. The remaining nine square miles are located to the north and west of the PBPC site. These off-site areas are undeveloped and have an ecology very similar to the presently undeveloped PBPC site. The evidence would not establish a finding that development of these off-site parcels together with development of the PBPC site would cumulatively result in water quality violations of surface or ground waters. The Applicants will be required to obtain permits to construct a wastewater treatment facility on the PBPC site. Whether any proposed wastewater treatment system will meet the standards of regulatory agencies would appropriately be considered in later proceedings. Similarly, individual tenants will, in some cases, be required to operate wastewater treatment systems that pretreat industrial waste before it is introduced into the system-wide wastewater treatment system or before it is otherwise removed from the site. These systems would also be subject to future permitting proceedings. Some of the potential activities that could be carried on by tenants at the PBPC involve the use of volatile organic compounds and other hazardous toxic substances. If proper techniques are not followed for the handling of such substances, or if some accident occurs, the substances could be introduced into the surface and ground waters. Review of each individual site plan and the establishing of systems for properly handling toxic substances can reduce the possibility of incidents occurring. Human frailties existing as they do, however, it is not unlikely that such an incident will occur. If such an incident occurs, it is vitally important that the contamination of surface or ground water be quickly detected and that steps be taken to remove the contaminant. The establishing of proper monitoring systems can reasonably assure that the contamination is identified. Techniques do exist for removing contaminants from surface and ground waters. Since individual tenants and site plans have not yet been established, it is not possible to make any finding as to whether any individual tenant or site plan might operate in such a manner as to cause violations of the Department's water quality standards. It is therefore appropriate that individual tenants and site plans be subjected to further review by appropriate regulatory agencies before they are permitted to operate on the PBPC site. The Applicants have agreed to such a review process. Since surface water flows into the Caloosa Canal can be controlled through the outfall structure at the southeast corner of the PBPC site, it appears practical to isolate any contaminant that might enter the surface water and to remove it. Groundwater flows in the aquifer lying below the PBPC site are very slow--less than one-tenth of one foot per day. Given such flow rates, it is likely that any contaminants that enter the groundwater can be detected and effectively removed. Even given the implementation of the best procedures for handling toxic substances, the best monitoring program for detecting accidental releases of the substances, and the best systems for removing the substances from surface and ground waters, there is some possibility that an accident could occur, that a contaminant would not be detected, and that violations of the Department's water quality standards could occur as a result in the Caloosa Canal or in the groundwater which underlies the Caloosa development and provides drinking water to residents there. The result of such an incident could have very serious impacts. The introduction of toxic substances into the surface waters could cause a substantial damage as far downstream as the Loxahatchee River Basin. Contamination of the groundwater could result in a loss of water supply to residents or in serious public health consequences. While such possibilities exist, they appear unlikely given the safeguards that have been proposed for PBPC. The Applicants do not propose to undertake any dredging or filling activities in any navigable waters.
Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED: That the Department of Environmental Regulation enter a final order issuing a permit to Caleffe Investment, Ltd., Worthington Enterprises, Inc., to conduct the dredging and filling activities proposed by the Applicants. To ensure that state water quality standards will not be violated, the conditions cited in the Department's Intent to Issue notice dated October 22, 1982, should be made a part of the permit. In addition, the following conditions should be made a part of the permit: All individual site plans within PBPC should be subject to the Department's permitting processes in accordance with Rule 17-4.28, Florida Administrative Code, and other provisions of Chapter 17, Florida Administrative Code, and Chapter 403, Florida Statutes, as may apply. The Applicants should be required to post bond in a sufficient amount to assure proper implementation and operation of monitoring systems for individual sites and to assure that adequate funds are available to remove and properly treat contaminants that might enter surface or ground waters as a result of accidents. RECOMMENDED this 19th day of May, 1983, in Tallahassee, Florida. G. STEVEN PFEIFFER Assistant Director Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 19th day of May, 1983. COPIES FURNISHED: Randall E. Denker, Esquire Lehrman & Denker Post Office Box 1736 Tallahassee, Florida 32302 Dennis R. Erdley, Esquire Alfred J. Malefatto, Esquire Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32301 Robert M. Rhodes, Esquire Terry E. Lewis, Esquire James Hauser, Esquire Messer, Rhodes & Vickers Post Office Box 1876 Tallahassee, Florida 32302 Alan J. Ciklin, Esquire Boose & Ciklin 8th Floor - The Concourse 2000 Palm Beach Lakes Boulevard West Palm Beach, Florida 33409 Tracy Sharpe, Esquire Farish, Farish & Romani 316 First Street West Palm Beach, Florida 33402 Ms. Victoria Tschinkel Secretary Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32301 Ms. Liz Cloud, Chief Administrative Code Bureau Department of State The Capitol, Suite 1802 Tallahassee, Florida 32301 Carroll Webb, Esquire Executive Director Administrative Procedures Committee Room 120, Holland Building Tallahassee, Florida 32301
The Issue Whether Petitioner should be granted No Notice General Environmental Resource Permits for Lots 61, 245, and 247 within Unit of Development 11 of the Indian Trail Improvement District, pursuant to permitting criteria of Chapter 373, Part IV, Florida Statutes, Chapters 40E-40 and 40E-400, Florida Administrative Code, and the South Florida Water Management District's "Basis of Review for Environmental Resource Permit Applications Within the South Florida Water Management District--November 1996."
Findings Of Fact Petitioner, Royal Palm Beach Colony (Royal Palm), is a limited partnership registered and authorized to do business in the State of Florida. Respondent, South Florida Water Management District (SFWMD), is a public corporation existing by virtue of Chapter 25270, Laws of Florida, 1949, and operating pursuant to Chapter 373, Florida Statutes, and Title 40E, Florida Administrative Code, as a water management district, with its principal office in West Palm Beach, Florida. Intervenor, 1000 Friends of Florida, Inc., is a not- for-profit, tax exempt membership corporation, organized and existing under the laws of the State of Florida. Intervenor, Indian Trail Improvement District (ITID), is a special district of the State of Florida established by special act of the Legislature, Chapter 57-646, Laws of Florida, and operating pursuant to applicable provisions of Chapter 298, Florida Statutes, as well as special acts of the Legislature. Royal Palm owns approximately 171 lots within Unit of Development 11 of ITID (Unit 11) in Palm Beach County, Florida. Each lot is approximately 1.25 acres. Not all of the lots owned by Royal Palm in Unit 11 are contiguous. Unit 11 is a rural subdivision within ITID, in which there are numerous private property owners. The property of Royal Palm that is the subject of dispute is comprised of three lots, Lots 61, 245, and 247. Unit 11 is within the C-18 Basin. Prior to the construction of the C-18 Canal, the area was typically drained by sheet flow to the north. Because of the flat topography, the drainage in the C-18 Basin is poor; therefore, following periods of heavy rainfall much of the land is inundated. Unit 11 contains an extensive amount of wetlands. There are currently no habitable structures within Unit 11. It consists of vacant lots with an interconnected network of roads, canals, and roadside swales. On August 15, 1975, SFWMD's predecessor, The Central and Southern Florida Flood Control District, issued ITID a surface water management permit, Permit No. 50-00136-S (the 1975 permit) for construction and operation of a surface water management system serving Unit 11. The permit authorizes discharge from Unit 11 to the west leg of the C-18 canal via three culverts. In 1988, SFWMD undertook a comprehensive examination of the C-18 Basin, which resulted in a publication entitled "Technical Publication 88-11, Flood Management Study of the C- 18 Basin, August, 1988." The study documented that the western leg of the C-18 canal lacked capacity to accept the permitted discharge from Unit 11. SFWMD determined that the development of Unit 11's flood control and water quantity management system according to Permit No. 50-00136-S would be inconsistent with the overall objectives of SFWMD, harmful to the water resources and the public's health, safety, and welfare, and to the policies and purposes of Chapter 373, Florida Statutes, and not in the best interest of future residents of Unit 11. SFWMD and ITID entered into a consent agreement concerning Unit 11 on July 7, 1989 (the Consent Agreement). SFWMD and ITID agreed that ITID would apply for, process, and obtain a modification of Permit No. 50-00136-S to address and resolve SFWMD's flooding and water quality concerns. In addition, ITID was to construct the surface water management system authorized in the permit modification in accordance with the terms of the permit. ITID received a permit from SFWMD in 1990 authorizing modifications to the surface water management system in order to address the issues identified in the Consent Agreement, namely potential flooding of homes constructed for future residents of Unit 11. The improvements approved in the 1990 permit were never implemented, and the permit expired. In 1992, ITID proposed a different modification to the surface water management system that proposed an impoundment for retention of stormwater. The permit application was recommended for denial by SFWMD staff, but has never been presented to the SFWMD Governing Board for final agency action. The problems regarding the water quality and flooding problems set forth in the Consent Agreement have not been remedied. On December 4, 1997, Royal Palm obtained variances from the Palm Beach County Health Department (the Health Department), granting Royal Palm the right under certain specified conditions to construct on-site sewage treatment and disposal systems (OSTD Systems) on Lots 61, 245, and 247. Originally, the Health Department had denied Royal Palm's request for permission to construct the OSTD Systems on lots 61, 245, and 247 on the grounds that the lots were located in an area subject to frequent flooding and the drainage in the subdivision had not been constructed in accordance with SFWMD's requirements. Subsequent to the granting of the variance, Royal Palm revised its site plans for the three lots, and those revised plans have not been reviewed by the Health Department for compliance with applicable rules. On March 19, 1998, Royal Palm notified SFWMD that Royal Palm was entitled to a No Notice General Permit (NNGP) for Lots 61, 245, and 247 for activities in uplands pursuant to Rule 40E-400.315, Florida Administrative Code. On April 9, 1998, SFWMD issued its agency action by letter that informed Royal Palm that SFWMD staff had determined that the three lots did not qualify for a NNGP. The letter stated the reasons for denial as follows: Reasonable assurances have not been provided to show that the proposed system or project is not part of a larger common plan of development. See Rule 40E- 400.315(1)(f), Fla. Admin. Code. Royal Palm Colony is the owner of approximately 170 lots within Unit 11 of the Indian Trail Improvement District, and the three proposed lots appear to be merely part of this large common plan of development. Reasonable assurances have not been provided to show that construction and/or operation of the proposed system with use of septic systems and the associated lack of water quality treatment will not cause pollution in violation of water quality standards. See Rule 40E-4.301(1)(e), and 40E-400.215(11), Fla. Admin. Code. There is not a viable or functioning stormwater management system in place or proposed to provide reasonable assurance that the septic systems would properly function. Reasonable assurances have not been provided to show that construction and/or operation of the proposed system will not cause adverse secondary impacts to the water resources, including, but not limited to, significant interference with the construction and operation of a regional stormwater system needed for adequate flood protection and stormwater treatment in the Unit 11 area. See Rule 40E-400.301(1)(f), Fla. Admin. Code. Reasonable assurances have not been provided to show that construction and/or operation of the proposed system will not cause water quality impacts to receiving waters and adjacent lands. See Rule 40E- 4.301(1)(a), Fla. Admin. Code. The proposed project adds impervious area and eliminates water storage. This consideration is especially relevant when considering the larger common plan of development. Reasonable assurance has not been provided to show that construction and/or operation of the proposed system will not cause adverse flooding to on-site and or/or (sic) off-site properties. See Rule 40E- 4.301(10)(b), Fla. Admin. Code. The proposed project adds impervious area and eliminates water storage. This consideration is especially relevant when considering the larger common plan of development. Reasonable assurances have not been provided to show that construction and/or operation of the proposed system will not cause adverse impacts to existing surface water storage and conveyance capabilities. See Rule 40E-4.301(10)(c), Fla. Admin. Code. The proposed project adds impervious area and eliminates water storage. This consideration is especially relevant when considering the larger common plan of development. Reasonable assurance has not been provided to show that construction and/or operation of the proposed system will not adversely impact the value of functions provided to fish and wildlife and listed species and other surface waters. See Rule 40-4.301(1)(d), Fla. Admin. Code. This consideration is especially relevant when considering the larger common plan of development. Reasonable assurance has not been provided to show that the proposed system or project is capable, based on generally accepted engineering and scientific principles, of being performed and of functioning as proposed. See Rule 40E- 4.301(1)(i), Fla. Admin. Code. On April 23, 1998, Royal Palm filed its Petition for Formal Administrative Hearing with the clerk of SFWMD, initiating this proceeding. Rule 40E-400.315(1)(f), Florida Administrative Code, is intended to authorize only very minor activities that have no potential to cause harm to water resources. Because the NNGP is issued by rule, SFWMD does not typically review projects that are conducted pursuant to a NNGP. A NNGP does not authorize projects that are part of a common plan of development or sale. In determining whether an activity is within a larger common plan of development, SFWMD staff look to see whether the project has shared infrastructure that facilitates development, such as canals, swales, and roads. A surface water management is in place in Unit 11. It consists of roads, swales, and drainage canals. The system drains to the C-18 canal via three culverts. The system was put into place as a result of the issuance of the 1975 permit, but there have been no modifications to the system as required by the Consent Agreement. During the last ten years ITID has done minimal maintenance to the system. A common road network within Unit 11 provides access to each of the three lots. The lots will depend on the swales and drainage canals as part of overall stormwater management system that serves Unit 11. Unit 11 is a common plan of development. Accordingly, the activities proposed by Royal Palm, filling in order to construct three single family houses with driveways, mounded septic tank systems, and wells within Unit 11 are not authorized pursuant to a NNGP. Royal Palm's predecessor company originally owned all the lots in Unit 11. Royal Palm is presently liquidating its assets. Royal Palm selected the three lots at issue in this case for permitting for individual homes because the lots represented a good overview of the different types of Royal Palm's holdings in the area. If Royal Palm is able to build homes on the three lots and depending on the market conditions and other outside factors, Royal Palm will make a decision on how to liquidate the other 168 lots in Unit 11. It is anticipated that the construction of the homes on the lots at issue will involve placement of fill. Land development, including the placement of fill, displaces stormwater that would, on a property in its natural condition, pond on the surface or soak into the ground. In order to determine whether a project complies with the flood protection criteria, SFWMD staff must consider the effect the proposed land development has off-site, and the effects surrounding lands may have on the lot to be developed. The flood routing calculations provided by Royal Palm in its application did not provide any analysis of how discharges from surrounding properties would affect the performance of the surface water management systems constructed on the lots at issue. Nor did Royal Palm address the potential for flooding of off-site properties by stormwater displaced by fill and impervious areas that are contemplated on Lots 61, 245, and 247. The three lots are not hydrologically separate from the remainder of Unit 11. Royal Palm's failure to include a detailed analysis of the surrounding area also precluded SFWMD from making a determination as to the impacts of the proposed activities upon existing surface water storage and conveyance capabilities. The proposed projects are single family houses. It is reasonable to expect that some discharge of untreated stormwater runoff from the system directly into wetlands and other surface water will occur. For Lots 245, 247, and 61, the proposed stormwater management system includes a dry detention area. Considering the topographic information for this site, part of the runoff from the fill area will not flow into the dry detention area but will flow untreated directly into wetlands and other surface waters. The runoff could reasonably be expected to include oils, grease, and petroleum from the driveway area and herbicide and pesticides from the yard area. The untreated runoff could pose an adverse impact. Development adjacent to wetlands has the potential to disrupt the usage of those wetlands by wildlife. Section 4.2.7 of the Basis of Review provides that secondary impacts to the habitat functions of wetlands associated with adjacent upland activities are not considered adverse if buffers with a minimum width of 15 feet and an average width of 25 feet are provided abutting those wetlands. In certain circumstances, additional measures are necessary. The Basis of Review provides that buffers must be in undisturbed condition, except that drainage features can be located in the buffer if their construction and operation will not negatively impact the wetlands. The design drawings for Lots 245 and 247 demonstrate that the buffers are not undisturbed because fill will be placed in the buffer areas. There is no treatment system in place for the roads in Unit 11; thus, there is a potential for untreated runoff from the roads, which could contain oils, grease, and petroleum constituents, to reach wetlands or surface waters. The roads in Unit 11 are sometimes under water and will require increased maintenance to correct erosion from increased vehicular traffic. Road maintenance and grading present the potential to discharge sediment laden water into adjacent wetlands. This threat is particularly great in Unit 11 because many of the roads go directly through wetlands. The engineering calculations submitted by Royal Palm anticipate that the elevation of the roads will be raised. Raising the elevations will require additional fill, and because several roads in Unit 11 go through wetlands, additional filling of wetlands can be anticipated. Section 6.9(a) of the Basis of Review, requires that residential projects must have the calculated ability to discharge a sufficient volume of stormwater such that the system can return to the control elevation within 12 days of a design storm event. Royal Palm failed to provide information demonstrating that the storage volume provided by the systems proposed for the three lots can be recovered and therefore available for subsequent storm events. Without an adequate understanding of the functioning of the overall surface stormwater management system in Unit 11, it is impossible to determine the amount of time necessary for the systems on the three lots to bleed down to control elevation. In order to allow access to the three lots from the roads, fill must be placed in the roadside swales. Because the elevation of the roadside swales is below the seasonal high water table, they are defined as other surface waters. The swales are depressional areas that support an abundance of obligate wetland vegetation; thus, they are encompassed within the definition of jurisdictional wetlands. Thus, the project will involve direct impacts to wetlands.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that a Final Order be entered denying Royal Palm Beach Colony, L.P.'s application for No Notice General Permits for Lots 61, 245, and 237. DONE AND ENTERED this 9th day of March, 1999, in Tallahassee, Leon County, Florida. ___________________________________ SUSAN B. KIRKLAND Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 9th day of March, 1999. COPIES FURNISHED: Samuel H. Poole, III, Executive Director South Florida Water Management District 3301 Gun Club Road West Palm Beach, Florida 33406 Douglas H. MacLaughlin, Esquire South Florida Water Management District 3301 Gun Club Road West Palm Beach, Florida 33406 Alfred J. Malefatto, Esquire Teresa J. Moore, Esquire Greenberg, Traurig, Hoffman, Lipoff, Rosen & Quentel, P.A. 777 South Flagler Drive Suite 300 East West Palm Beach, Florida 33401 Terrell K. Arline, Esquire 1000 Friends of Florida Post Office Box 5948 Tallahassee, Florida 32301 Charles F. Schoesch, Esquire Caldwell & Pacetti 234 Royal Palm Way, Suite 300 Palm Beach, Florida 33480
Findings Of Fact In 1984, the South Florida Water Management District (SFWMD) issued surface water management permit number 48-00201-5 for a 515 acre project, Isleworth Golf and Country Club, located in southwest Orange County. The permit was issued to the developer, Isleworth Partners. Sometime after the permit was issued and the system was constructed, nitrate concentrations were detected in holding ponds BE-15 and 16. District staff speculated that the shallow ground water table was contaminated with residual nitrogen left from nutrient applications to a citrus grove previously on the site. They were concerned that the high nitrate ground water was seeping into the storm water storage ponds and would eventually be discharged into adjoining Lake Bessie, thereby affecting the water quality of the lake. Lake Bessie, along with other lakes in the region, was also experiencing rising levels. On March 24, 1988, Isleworth Partners submitted to the SFWMD its application number 03248-G, to modify the existing surface water management permit, to help prevent the water quality problems from occurring in Lake Bessie, as described above, and to ameliorate and mitigate against increased lake levels in Lake Bessie. It was not intended to provide flood protection for Lake Bessie. The solution proposed in the modification request, as well as in water use permit applications processed at the same time, was to retain substantially more water in storage ponds BE-15 and 16, and to recycle some of the water from those ponds for use in irrigating the golf course. There were no objections to the water use modifications which were processed with the surface water management permit modification, and the water use modifications were approved by the SFWMD governing board in June 1988. As they affect ponds BE-15 and 16, the water use modifications include pumping the ponds down to a new control level of 97 feet NGVD and using that water to irrigate the golf course. This process has already been implemented with beneficial results: the nitrate concentrations in the ponds have been reduced. The surface water management modification which is the subject of the application at issue is to raise the weir structure from 101.6 to 103 feet NGVD in pond BE-15 to provide complete retention of a 10 year/24 hour storm event without discharge to Lake Bessie from the pond. The under drain system at Pond BE-15 will also be plugged to prevent the existing permitted bleed down of the pond waters into Lake Bessie. This structural modification involves simple construction work and can be completed in one or two days. Ponds BE-15 and 16 are currently connected by an equalizer pipe, and will remain so. Under the modifications the ponds will be maintained (control elevation) at 97 feet NGVD through the use of existing permitted pumps. The maximum elevation of the ponds will be raised from 101.6 feet to 103 feet NGVD by the alteration of the weir. This means the waters in the ponds would have to top 103 feet to overflow and discharge, by way of an existing pipe, to the swales along Lake Bessie and thence into the lake. A 10 year/24 hour storm event is the amount of rainfall that will statistically occur in a 24-hour period once every ten years, or ten times in a 100-year period. The amount of rainfall in a 10 year/24 hour storm event is roughly seven and a half inches. The modification proposed by Isleworth Partners is intended to retain the runoff from that storm. Currently, under the system as permitted, only the first inch of runoff must be retained. This is about 2.4 inches of rainfall or approximately a 3-year/1-hour storm event. Substantially more water will be retained in Ponds BE-15 and 16 under the proposed modification. The staff of SFWMD recommended that the application be granted, with twelve standard limiting conditions and eight special conditions, including the following: * * * The permittee shall be responsible for the correction of any water quality problems that result from the construction or operation of the surface water management system. The district reserves the right to require that water quality treatment methods be incorporated into the drainage system if such measures are shown to be necessary. * * * (Isleworth Exhibit #3, p. 6) John Robertson, Donald Greer and Robert Londeree reside on Lake Bessie. John Robertson and Donald Greer are members and officers of a nonprofit corporation, the Petitioner in this case, Friends of the Lakes, Inc. These residents are concerned that the level of Lake Bessie has risen in the last few years and that it is becoming polluted. Long standing docks which had been primarily dry are now frequently under water. The residents have observed milky or greenish yellow water discharging from pipes from the Isleworth development. These residents, who are not parties to the proceeding, concede that, if the modification works as intended, the system will be improved and the impact to Lake Bessie Will be lessened. Petitioner, Friends of the Lakes, Inc., questions the reliability of the pumping system to maintain the 97.0 foot control elevation. If the ponds are maintained at a control level of 97.0 feet, the 10 year/24 hour storm water will be retained. If, however, through a series of smaller events, the level is higher than 97.0 feet, less capacity will exist, and the water will discharge sooner to Lake Bessie. The current permitted pump operates at 375 gallons a minute. Depending on whether the pump is operated continuously or part-time, it would take from four to twenty days to pump down the pond from a maximum 103 feet to the 97 foot level. The District found the pumping system to be acceptable at Isleworth because the development has a full-time maintenance staff of 35 people, of whom three work on the pumping system. A maintenance supervisor checks the pumps daily, and the developer has an agreement with a pump company to replace the pump, if needed, within four to six hours. The system is considered reliable and the increased pond holding capacity will insure that more water will be retained than under the existing permitted system. Stephen Miller is the professional engineer whose firm prepared the application for modification and the original application for the surface water management permit. He is aware of some changes in the project as constructed which differ from his design for the original system. These changes relate specifically to grading on the golf course and not, as suggested by Petitioner, to the operation of ponds BE-15 and 16. Stephen Miller believes that the modifications will do exactly what they are proposed to do. The application for the modifications took into account the existing conditions which differ from the permitted construction plans. Ronald R. Potts testified for Petitioner as an expert in geology and surface and ground water hydrology. He agrees that the application for modification meets all requirements of the SFWMD with the exception of a single standard condition: * * * 3. The permittee shall comply with all applicable local subdivision regulations and other local requirements. In addition, the permittee shall obtain all necessary federal, state, local and special district authorizations prior to the start of any construction or alteration of works authorized by this permit (Isleworth Exhibit #3, P. 6.) The district staff report recommending approval for the modification request was sent to Orange County for its review and comment. Orange County made no objections. Within Orange County it is the engineering department which is responsible for the implementation and interpretation of the Orange County subdivision regulations as they apply to storm water management. The SFWMD does not attempt to enforce other agencies' requirements. The Orange County Engineer, George Cole, determined that neither section 10.1.2 nor section 10.4.4(D) of the Orange County Subdivision Regulations were applicable to the modification proposed by Isleworth. Section 10.1.2 requires that recharge to the Floridan Aquifer, where soils are compatible, shall be accomplished by providing for retention of the total run off generated by a 25 year frequency, 24 hour duration storm event from the developed site. Section 10.4.4(D) of the Orange County Subdivision Regulations requires that a pond design detain a 100 year storm event when discharge into a lake without a positive outfall is proposed. When the County first approved Isleworth's Planned Development, it set a specific requirement that the storm water management system retain the first inch of runoff and detain the difference between pre-development and post- development discharge for a 25 year/24 hour storm. "Retention" of storm water means that the water must be held on site and disposed of by some means other than discharge. "Detention" requires only that water be held back for a period of time before discharge. The Isleworth property is not located in a prime recharge area, as under its soils is a highly impermeable lens, commonly called "hardpan." Lake Bessie has a positive outfall, a pipe connecting Lake Bessie with nearby Lake Down. Although the pipe was plugged with debris for a period of years, it has been cleaned out and the potential exists for outfall from Lake Bessie in flood conditions. The County's 100 year/24 hour detention requirement would still allow the ponds to discharge more water to Lake Bessie than the proposed 10 year/24 hour retention design, and is, therefore, less restrictive. Lake Bessie presently is one of Florida's most pristine lakes with crystal clear water that is ideal for recreational purposes. The natural dynamic state of lakes is that over a period of time they evolve from oligotrophic, with clear water and a balanced system; to mesotrophic, with less water clarity, more nutrients, increased algae and less desirability for human use; to a eutrophic state, with even less clarity, choking vegetation, less fish and less pleasing appearance and utility. This occurs in a natural state as lakes fill in with decaying matter from the shore. Petitioner claims that discharge from Isleworth will hasten the death of the lake. Phillip Sacco testified for the Petitioner as an expert biologist and limnologist (one who studies fresh bodies of water). He performed a modeling analysis to determine the amount of phosphorus being discharged into Lake Bessie and he opined that the Isleworth development will cause Lake Bessie to change to a eutrophic state. A significant component of his analysis was his assumption that 920 acre-feet of water would be discharged into Lake Bessie as a result of the modification. (transcript pp. 557-558). The 920 acre feet is actually the total amount of water which enters Lake Bessie from the entire Lake Bessie basin, not just from the Isleworth property, and includes both surface water (2%) and ground water (98%). The analysis is discredited by the false assumption. Mr. Sacco also theorized that the interaction of nitrogen and phosphorus precipitated by the change in land use occasioned by the Isleworth development would produce deleterious effects on Lake Bessie's water quality: "Nitrogen is the dynamite; phosphorus is the fuse and the land use change of Isleworth is the match." The permit modification application at issue does not relate to a land use change. The change from orange groves to residential development occurred years ago and has already been permitted. In fact, the land change providing the ignition in Mr. Sacco's vivid metaphor is just as likely in the even earlier cultivation of the groves and use of nutrients in their production. The single result of the modification at issue will be less water being discharged into Lake Bessie than is currently permitted from the system, thus conserving the water quality present in the lake. The residents who testified are not parties to this proceeding. Although two of them established they are members and officers of Friends of the Lake, Inc., no evidence was produced regarding the corporation, its legal existence or purpose.
Recommendation Based on the above it is hereby RECOMMENDED: that a final order be issued granting the application for permit modification, and denying Isleworth Partners' request for costs and attorney's fees. DONE AND ENTERED this 17th of August, 1989, in Tallahassee, Leon County, Florida. MARY CLARK Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 17th day of August, 1989. APPENDIX Case NO. 88-3056 The following constitute specific rulings on the findings of fact proposed by the parties: PETITIONER'S PROPOSED FINDINGS: 1-2. Adopted in part in paragraph 9. However, testimony on the dying trees was excluded as beyond the witnesses' expertise. 3-4. Adopted in part in paragraph 2, otherwise rejected as not based on competent evidenc. Adopted in paragraph 3. Adopted in part in paragraph 10, otherwise rejected as unsupported by the evidence. The pumps already exist and are permitted. Rejected as irrelevant Rejected as unnecessary Rejected as inconsistent with the evidence. Adopted in paragraph 12. Rejeceted as unsubstantiated by competent evidence; the proposed fact is also too vague and ambiguous to properly address. Rejected as unsupported by competent evidence. Rejected as irrelevant, unnecessary, or unsupported by competent evidence. 14-15. Rejected as unsupported by the weight of evidence. Rejected as unnecessary. Rejected as contrary to the weight of evidence and irrelevant. Adopted in part in paragraph 16; the contribution by the development is rejected as unsupported by competent evidence. Rejected as unsupported by competent evidence. Addressed in paragraph 16. Rejected as contrary to the evidence. Rejected as irrelevant. Adopted in paragraph 16. Rejected as contrary to the weight of evidence. 25-31. Rejected as irrelevant and unnecessary. Rejected as testimony summarized rather than findings of fact. Rejected as unecessary. Rejected as unnecessary. RESPONDENT'S PROPOSED FINDINGS: ISLEWORTH PARTNERS Adopted in paragraph 1, except the finding regarding the existing system meeting district requirements is rejected as irrelevant. Adopted in substance in paragraphs 2 and 3. 3-4. Adopted in substance in paragraphs 5 and 6. Adopted in substance in paragraph 7. Rejected as cumulative and unnecessary. Adopted in part in paragraph 9, otherwise rejected as unnecessary. Adopted in substance in paragraph 11. Rejected as unnecessary. Adopted in paragraph 12. Adopted in paragraph 13. Included in conclusion of law #6. Adopted in paragraph 13. 14-19. Adopted in substance in paragraphs 14 and 15. Rejected as unnecessary. Adopted in paragraph 16. 22-25. Adopted in part in paragraph 16, otherwise rejected as unnecessary. Adopted in part in paragraph 4, otherwise rejected as unnecessary. Rejected as unnecessary. 28-31. Adopted in part in paragraph 9, otherwise rejected as unnecessary. 32. Adopted in paragraph 18 and in conclusion of law #2. SOUTH FLORIDA WATER MANAGEMENT DISTRICT 1-2. Adopted in paragraph 3 and 4. Adopted in paragraph 5. Adopted in paragraph 7. 5-6. Adopted in paragraph 10. Adopted in paragraph 11. Adopted in paragraph 13. 9-10. Adopted in paragraph 14. Adopted in paragraph 16, otherwise rejected as cumulative or unnecessary. Adopted in part in paragraph 14. COPIES FURNISHED: J. Alan Cox, Esquire Bogin, Munns & Munns 105 West 5th Avenue Tallahassee, FL 32303 Chris H. Bentley, Esquire W. Douglas Beason, Esquire Rose, Sundstrom & Bentley 2548 Blairstone Pines Drive Tallahassee, FL 32301 William Doster, Esquire Lowndes, Drosdick, Doster, et al., PA P.0. Box 2809 Orlando, FL 32802 James K. Sturgis, Esquire South Florida Water Management District P. O. Box 24680 West Palm Beach, FL 33416-4680
Findings Of Fact The property has been annexed into the Acme Improvement District (Intervenor) by Special Act of the Florida Legislature. Petitioner purchased 487.7 acres of this tract from private owners in 1954. Subsequently, Petitioner purchased 653.59 acres from the Trustees of the Internal Improvement Fund of the State of Florida on or about March 4, 1960. The balance of the land constituting the property is a 224 acre hiatus tract owned by Marshall Brown with whom Petitioner has an agricultural use agreement. A parcel of Petitioner's land within the property includes a commercial lease to Malrite Corporation for siting a television antenna, consisting of 111 acres in the southeast corner of the property. This area is within the permit application. The tract is otherwise undeveloped and is currently submerged or semi- submerged during much of the year. Petitioner's development plan envisions drainage of this tract and use of the property for cultivation. The property is bounded on the north by Acme Improvement District, on the east by a subdivision called Homeland, on the west by Water Conservation Area #1, also known as the Loxahatchee Refuge, and on the south by undeveloped lands. The boundaries of the Loxahatchee Refuge actually encroach by approximately 300 feet into the property. The property development plan, which is the basis of this application, was prepared by the engineering firm Gee and Jensen. This plan calls for the creation of a 240 acre reservoir of a proposed 3 foot maximum depth. This reservoir would hold the internal stormwater runoff for subsequent agricultural irrigation. Perimeter dikes are to be constructed to prevent surface water runoff from outside areas entering the project and perimeter ditches are to be developed for the deliverance of stormwater runoff from the internal agricultural system to proposed pump stations located at the southwest corner of the development area. On the northwest corner of the proposed reservoir, the existing Acme Improvement District pump station No. 2 would be increased in capacity by 27,000 gallons per minute. Under Acme's charter and its statutory annexation of the property, the proposed reservoir and water management works would become a unit of development controlled by Acme. Under Petitioner's agreement with the hiatus tract owner, Acme would be the exclusive manager and operator of the proposed system, and the property would become an integral part of Acme's water management system. The Acme Water Improvement District is not solely an agricultural support enterprise but serves the various uses which may evolve within its boundaries. The area is currently zoned for limited residential development as well as agricultural. The television antenna facility located on the property is an example of a non-agricultural use. Petitioner's surface water management system is proposed to discharge into the Acme system, which in turn discharges offsite. Discharge into the Acme system is of a limited nature, but the system is designed to discharge for successive days under wet conditions. The design discharge is not limited to an extreme rainfall event but would probably occur during the traditional hydrologic cycle of south Florida. Under conditions which reflect actual rainfall over the past 20 years, the proposed surface water management system would have discharged 19 out of 20 years into the Water Conservation Area (Loxahatchee Refuge). In some years this discharge would have continued for approximately three months. The unrebutted testimony of expert witnesses called by Respondent established that the entire 1,393 acre tract referred to herein as "the property" is a freshwater wetland habitat. The western half is emergent marsh land, while the eastern half is forested with woody species. The wetlands on the property form a valuable wildlife habitat. Environmentally, they are in excellent condition. This area has not been adversely affected by drainage, fire or exotic species. These marshes also have good habitat diversity. The populations of aquatic invertebrates and forage fishes that are produced in these Everglades marshes are utilized by the many species of wading birds that feed in these wetlands. The proposed project will adversely affect wildlife species, including a variety of wading birds which will likely be unable to relocate. While this is undesirable from an environmental standpoint, conversion of this land would provide benefits from an agricultural standpoint, and would create additional water recreational facilities.
Recommendation From the foregoing, it is RECOMMENDED: That Respondent enter a final order denying the application. DONE and ORDERED this 30th day of November, 1983, in Tallahassee, Florida. R. T. CARPENTER Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 30th day of November, 1983.
The Issue Whether FDOT has provided reasonable assurances that the activities it proposes to conduct pursuant to proposed District SWM Permit Application No. 940606-10, WRM Permit Application No. 940606-2-D and modification to ROW Permit No. 2584 will comply with the relevant permit criteria set forth in Chapters 373 and 403, F.S., and applicable rules and criteria promulgated thereunder.
Findings Of Fact THE PARTIES Petitioner, 1000 Friends of Florida (1000 Friends), is a not-for-profit, tax exempt membership corporation, organized and existing under the laws of the State of Florida. The principal office of 1000 Friends is 926 East Park Avenue, Tallahassee, Florida 32314 and it also maintains an office at 3305 College Avenue, Ft. Lauderdale, Florida 33314. Petitioner, Florida Bay Initiative, Inc. (FBII), is an entity incorporated under the laws of Florida with its principal office located at 250 Australian Avenue South, Suite 500, West Palm Beach, Florida 33401. Petitioner, the Florida Keys Fishing Guides Association, is an association of sport fishing guides who live in the Florida Keys and is headquartered at 138 Royal Lane, Islamorada, Florida 33036. Petitioner, Michael Collins, is a private individual. His address is 138 Royal Lane, Islamorada, Florida 33036. Petitioner, Charles W. Causey, is a private individual. His address is Post Office Box 448, Islamorada, Florida 33036. Petitioner, the Florida Keys Concerned Citizens Coalition (FKCC), is a not-for-profit Florida corporation whose address is West Shore Drive, Big Pine Key, Florida 33043. Petitioner, AG Intus, Inc., filed a Notice of Voluntary Dismissal on August 9, 1996. DOAH Case 95-5524, the proceeding filed by Intus, was previously consolidated with the other cases to this proceeding. On August 12, 1996, the Intus case was severed from this proceeding and the Intus hearing cancelled. Respondent, the South Florida Water Management District (the District or SFWMD), is a public corporation in the State of Florida existing by virtue of Chapter 25270, Laws of Florida, 1949, and operating pursuant to Chapter 373, F.S., and Title 40E, F.A.C., as a multi-purpose water management district, with its principle office in West Palm Beach, Florida. Respondent, the Florida Department of Transportation (FDOT), is an agency of the State of Florida. Its District Six address is 1000 N.W. 111th Avenue, Miami, Florida 33172. Intervenor, Monroe County, is a political subdivision of the State of Florida. For the purposes of this proceeding the address for Monroe County is c/o Apgar and Pelham, 909 East Park Avenue, Tallahassee, Florida 32301. The District, FDOT and Monroe County did not object to the standing of the Petitioners at the formal hearing and represented that they will not object to the standing in the event of an appeal. Based on the representations of the Respondents, the Petitioners were not required to put on a case as to their standing. THE THREE PERMIT APPLICATIONS FDOT has applied to the District for a Wetland Resource Management (WRM) permit, a Surface Water Management (SWM) permit, and a Right of Way (ROW) occupancy permit. On June 6, 1994, the Applicant submitted applications for surface water management and wetland resource management permits for the purpose of widening and modifying this 20.4 mile stretch of U.S. 1. The surface water management permit application is identified as Application No. 940606-10. The wetland resource management permit application is identified as Application No. 940606-2-D. On October 24, 1995, the District issued Staff Reports on Permit Application No. 960606-10 and Permit Application No. 94060-2-D. These Staff Reports recommended issuance of the permits subject to general and special conditions as specified therein. An addendum to the staff report was issued November 3, 1995. On September 27, 1994, the Applicant submitted a request to modify its existing ROW Occupancy Permit to enable it to replace the bridge where U.S. 1 crosses the C-111 Canal. The land encompassed by the ROW occupancy permit challenged in this proceeding is located in Section 16 and 17, Township 59 South, Range 39 East, Dade County, Florida. A draft right-of-way occupancy permit with standard limiting and special conditions was produced as part of a package that went to the Governing Board and others. The proposed authorization for use of the ROW is for the following: REMOVAL OF EXISTING U.S. HIGHWAY 1 BRIDGE AND REPLACEMENT WITH A NEW FIXED BRIDGE. PROJECT INCLUDES CONSTRUCTION OF A NEW SERVICE/ACCESS ROAD, 2 DETENTION PONDS, 2 CATCH BASINS, 2-15" R.C.P. OUTFALLS, BOAT RAMP WITH LOADING DOCK, PARKING AREA, PEDESTRIAN GATE AT S-197, FENCING AND WILDLIFE CROSSING ALL WITHIN THE NORTH AND SOUTH RIGHT OF WAY OF C-111 (STATION 938+00 - 955+00). The draft right-of-way occupancy permit modification, identified as “SFWMD PERMIT NO. MOD 2548," should correctly be identified at “SFWMD PERMIT NO. MOD 2584.” The numbers “8” and “4” were inadvertently transposed. STIPULATIONS AS TO APPLICABLE LAW The parties have accurately set forth the applicable permitting criteria and the appropriate Basis of Review in their prehearing stipulation. CRITERIA FOR ROW PERMIT Rule 40E-6.301, Florida Administrative Code, provides, in pertinent part, as follows: In determining whether an occupancy permit should be issued, the District shall consider whether the proposed activity: interferes with the present or future construction, alteration, operation or maintenance of the works of the District; is consistent with the policy and objectives of Chapter 373 F.S., the legislative declaration of policy contained in Section 373.016, F.S. and the state water policy, Chapter 17-40, F.A.C.; has an actual or potential negative impact upon environmentally sensitive areas, which include: wetlands; endangered or threatened species habitat; aquatic preserves; outstanding Florida waters; federal, state and privately owned parks and wildlife management areas; designated areas of critical state concern; lands purchased by federal, state and local governments for the purpose of environmental protection, water resource protection and esthetics; and lands which contain native terrestrial plant species in significant amounts. Environmentally sensitive areas include areas on and off- site that are affected by activities which occur on, or are initiated from, the District’s works; degrades water quality within the receiving water body or fails to meet the provisions of Ch. 373, F.S., the state water policy, and Ch. 40E, F.A.C.; involves a discharge of wastewater from a new wastewater source or an increased discharge from an existing wastewater source; will discharge debris or aquatic weeds into District lands or works or cause erosion or shoaling within the works of the District; is supported by financial assurances, which will ensure that the proposed activity will be conducted in accordance with Chapter 373, F.S., and Chapter 40E-6, F.A.C.; presents an increased liability risk to the District; meets the general and specific criteria in the Basis of Review which is incorporated by reference in Rule 40E- 6.091, F.A.C.; interferes with actual or potential public use of the District’s works or public, recreational or other facilities not within the District’s works; is consistent with local zoning and other private land uses in the area; interferes with the quality or quantity of a public or private water supply; meets applicable criteria in Chapters 40E-61 and 40E-62, F.A.C.; ROW occupancy permits typically have standard limiting conditions which are incorporated as part of the permit. The permit may also have special limiting conditions. CRITERIA FOR PERMITTING THE SWM SYSTEM Rule 40E-4.301(1), Florida Administrative Code, contains the following criteria that, at the times pertinent to this proceeding, were used by SFWMD in determining whether to permit a surface water management system: In order to obtain or modify a permit under this chapter, an applicant must give reasonable assurances that the surface water system: provides adequate flood protection and drainage, without causing over- drainage, will not cause adverse water quality and quantity impacts on receiving waters and adjacent lands regulated pursuant to Chapter 373, F.S., will not cause discharges which result in any violations, in surface waters of the state, of the standards and criteria of chapter 17-302, F.A.C., will not cause adverse on-site or off-site impacts on surface and groundwater levels and flows, including impacts to sources of water supply and wetland hydrology, will not cause adverse environmental impacts, can be effectively operated and maintained, will not adversely affect public health and safety, is consistent with the State Water Policy, chapter 17-40, F.A.C., for a DRI with a signed Preliminary Development Agreement with the Florida Department of Community Affairs, pursuant to section 380.06(8), F.S., provides a surface water management system for that portion of the site approval for development which is able to operate separately from the surface water management system for the balance of the project site and still meet applicable District criteria. meets any applicable basin criteria in chapter 40E-41, F.A.C., will not otherwise be harmful to the water resources of the District, will not interfere with the legal rights of others as defined in subsection 17-40.401(8), F.A.C., is not against public policy, will meet general and specific criteria in the document described in subsection 40E-4.091(1)(a), F.A.C., (0) will meet criteria for isolated wetlands, which are found in Appendix 7 of the document described in rule 40E- 4.091(1)(a), F.A.C., (p) will meet the criteria for above ground impoundments, which are found in Appendix 6 of the document described in rule 40E-4.091(1)(a), F.A.C. The SFWMD has adopted certain procedures and criteria contained in a document, referred to as “Basis of Review for Surface Water Management Permit Applications Within The South Florida Water Management District” (BOR). Subsection 40E-4.091(1)(a), F.A.C. incorporates this document by reference into Chapter 40E-4, F.A.C. The BOR is a document that is “described in subsection 40E-4.091(1)(a), F.A.C.,” within the meaning of Rule 40E-4.301(1), F.A.C. The BOR establishes a rebuttable presumption that water quality criteria are met through specified volumetric retention and detention requirements. These performance based criteria are designed to be flexible. CRITERIA FOR THE WRM PERMIT In 1992 DEP entered into an Operating Agreement with the District, which delegated to the District responsibility for issuing wetland resource management (WRM) permits, which are required for dredge and fill activities in wetlands. Both DEP and the District implement the same wetland resource permit and MSSW permit rules. The District agrees with DEP's interpretation and application of the WRM permitting rules and non-rule policy, and applies the same when issuing such permits. Section 403.918, Florida Statutes (1991), provides the pertinent criteria that must be applied by the District in determining whether to grant or deny the WRM permit. That criteria requires the applicant to provide reasonable assurance that water quality standards will not be violated. In addition, for projects in OFW, the applicant must provide reasonable assurance that the project is clearly in the public interest. THE PUBLIC INTEREST TEST The District is required to balance the following criteria, found at Section 403.918(2)(a), Florida Statutes (1991), in determining whether a project is clearly within the public interest: Whether the project will adversely affect the public health, safety, or welfare or the property of others; Whether the project will adversely affect the conservation of fish and wildlife, including endangered species, or their habitats; Whether the project will adversely affect navigation or the flow of water or cause harmful erosion or shoaling; Whether the project will adversely affect the fishing or recreational values or marine productivity in the vicinity of the project; Whether the project will be of a temporary or permanent nature; Whether the project will adversely affect or will enhance significant historical and archaeological resources under the provisions of s.267.061; and The current condition and relative value of functions being performed by areas affected by the proposed activity. MITIGATION If the applicant is unable to otherwise meet the public interest test, the District shall, pursuant to Section 403.918(2)(b), Florida Statutes, “consider measures proposed by or acceptable to the applicant to mitigate adverse effects which may be caused by the project . . .” The District thereafter re-evaluates the project to determine whether the project, as mitigated, meets the public interest test. The criteria for mitigation is found in Chapters 373 and 403, Florida Statutes, Title 40 E (including the Basis of Review) and Rule 62-312, Florida Administrative Code. Rule 62-312.330, Florida Administrative Code, states the general criteria for evaluating mitigation proposals as follows: The goal of the mitigation proposal shall be to offset the expected adverse impact of the project that have resulted in the project being deemed unpermittable such that the resulting project with mitigation is not contrary to the public interest or, in the case of Outstanding Florida Waters, is clearly in the public interest. Each project must be separately evaluated to determine whether the proposed mitigation is sufficient. Rule 62-312.340, Florida Administrative Code, provides guidelines that are to be used in evaluating proposed mitigation projects. GENERAL DESCRIPTION OF THE PROJECT AREA FDOT proposes to widen a 20.4 mile portion of U.S. 1 in southern Dade County and northern Monroe County. Approximately seven miles of the project area is in Monroe County and approximately thirteen miles is in Dade County. The northern terminus of the project is the intersection of U.S. 1 and Card Sound Road, which is located in Dade County south of Florida City. The southern terminus of the project is the intersection of U.S. 1 and Abaco Road on Key Largo in Monroe County. The corridor of the proposed project passes through Sections 6, 7, 16, 18, 21, 27, 28, Township 59 South, Range 39 East; Sections 24, 25, 36, Township 58 South, Range 38 East; Sections 16, 19, 30, 31, Township 58 South, Range 39 East, Sections 16, 30, 31, Township 60 South, Range 40 East; Sections 25, 26, Township 60 South, Ranges 39 East, Dade and Monroe Counties, Florida. U.S. 1 is the main highway between northern Monroe County and southern Dade County. The only other road between Monroe County and Dade County is Card Sound Road. The Florida Keys is designated as an Area of Critical State Concern, pursuant to Section 380.0552, Florida Statutes. The Dade County portion of the road, north of the C- 111 canal, lies within typical Everglades habitat, which is classified as environmentally protected lands of Dade County. Most of the project corridor in Dade County is part of or adjacent to the Everglades National Park. Valuable wetlands exist throughout the project corridor. The following bodies of water will receive discharges if the surface water management system is permitted: C-111 Canal, Jewfish Creek, Lake Surprise, Blackwater Sound, Barnes Sound, Little Blackwater Sound, Long Sound, Manatee Bay, Sarge Lake, andManatee Creek. The receiving bodies of water are Outstanding Florida Waters (OFWs) or are connected to OFWs. THE EXISTING ROADWAY As it presently exists in the project area, U.S. 1 is a two lane undivided highway with two passing zones that are each one mile in length. Each travel lane on the existing facility is twelve feet wide. The existing shoulder on either side of the road consists of four feet of pavement and six feet of grassed area. FDOT Exhibit 7 accurately depicts the existing roadway typical section. Exotic vegetation, generally limited to the areas immediately adjacent to the highway, exist throughout the project corridor. These exotic species are present because FDOT has failed to properly maintain its right of way. A clear zone is an unobstructed area that includes the shoulder of the roadway and typically extends beyond the shoulder. The purpose of the clear zone is to provide a driver who has lost control of his or her vehicle a sufficient clear recovery area to regain control of the vehicle so that it can be maneuvered back onto the road. The clear zone for the existing road is inadequate to provide a safe recovery area. There is at present a two lane bridge over Manatee Creek, a two-lane bridge crossing the C-111 Canal, a bascule bridge, which is a drawbridge, over Jewfish Creek, and a two lane causeway through Lake Surprise. The two existing passing zones are located in Dade County. The first is south of U.S. 1’s intersection with the C-111 canal between mile markers 113-115. The second passing lane is approximately four miles south of the northern terminus of the project between mile markers 120-122. Each existing passing zone is undivided and consists of two northbound lanes and two southbound lanes, with each travel lane being twelve feet in width. The shoulders in the passing zones are the same as for the typical section. A surface water management (SWM) system is defined by Rule 40E-4.021(5), Florida Administrative Code , as being "the collection of devices, improvements or natural systems whereby surface waters are controlled, impounded, or obstructed.". There is no surface water management system presently associated with the road. The roadbed is elevated approximately five feet above mean sea level according to the National Geodetic Vertical Datum and was constructed on the old railroad bed of the Florida East Coast Railroad. No hydrologic culverts have been placed within the roadbed. Consequently, surface water flow between the eastern and western sides of the road north of the C-111 Canal has been cut off. C-109 AND C-111 CANALS In the 1960's, the C-109 and C-111 canals were constructed as part of an overall water management system in the area. As a result of the roadbed and the canals, water has been impounded on the western side of U.S. 1 at a level higher than on the eastern side. Due to cutoff of waterflow by the roadbed embankment, historic freshwater flow between the eastern and western sides of the project area has been restricted, which has resulted in an adverse impact on the Everglades ecosystem north of the C-111 Canal. The restricted water flow has resulted in less fresh water being available for shorter periods of time. Consequently, aquatic life has had reduced opportunities to develop. The restricted flow also has impeded the ability of aquatic life to reach freshwater areas during times of drought. On the east side of the road marine conditions have displaced what naturally should be freshwater conditions. PROJECT HISTORY While FDOT has been aware of traffic safety and hurricane evacuations concerns on the roadway for a long time, the current project originated in 1986 when Monroe County identified this project as a need in its 1986 Comprehensive Plan. Pursuant to agency practice, the proposed project was incorporated into FDOT's five year work program and a study was performed pursuant to FDOT’s Project Development and Environment (PD&E) Manual. FDOT's PD&E manual describes the process by which FDOT determines whether to construct or improve a road. The PD&E process includes an Environmental Impact Statement (EIS) to analyze existing conditions, assess the need for improvement, and develop alternatives. A Draft EIS is performed and circulated for comment to governmental agencies and the public. Based upon comments and further review a Final EIS is prepared. Metric Engineering ("Metric") began the PD&E study of the project in 1988 pursuant to a contract with FDOT. Metric identified seven factors which it concluded supported the need for the project. First, the improved corridor would improve the linkage between the four lane road at the northern terminus and the four lane road at the southern terminus. Second, the project would improve navigation by replacing the existing bascule bridge at Jewfish Creek. Third, the project would improve the level of service for the road. Fourth, the project would improve the safety of the road. Fifth, the project would improve the clearance time for hurricane evacuation. Sixth, the project was consistent with the long range transportation plans adopted by Monroe County. Seventh, the project would accommodate increased traffic, which can be expected with or without the project. Based on the needs evaluation, Metric performed a corridor analysis to determine the best way to get from Florida City to Key Largo, including improving only Card Sound Road, improving only U.S. 1, or improving a combination of the two. Metric concluded that the best resolution was to improve the project corridor. Metric also analyzed various alternatives in an effort to reduce the size of the typical section of the roadway in the U.S. 1 corridor and thereby minimize environmental impacts of the project. Because of concerns from Everglades National Park that no aspects of the project construction occur within its boundaries, FDOT agreed to conduct all construction east of FDOT's existing right of way line. The conclusions of the Metric studies were memorialized in a Final EIS and Final Engineering Report published in 1992. Conclusions regarding alternatives and project needs were then incorporated into the permit application and have continued to be updated. The 1992 version of the project was for a four lane roadway with four lane bridges throughout the project corridor. Subsequent to its June 6, 1994, permit applications to the District for a four lane roadway, FDOT went through an extensive process of providing the District with additional information in an effort to provide the District with the necessary reasonable assurance that the proposed project would comply with the permit criteria. The final series of modifications contained the three lane alternative, which will be described in detail below and is now the subject of this proceeding. The three lane proposal is a compromise that FDOT agreed to in an effort to minimize the direct, secondary, and cumulative impacts of the project. Monroe County passed Resolution No. 315-1995 on September 7, 1995, asking FDOT to build a three-lane road on a four-lane embankment. This resolution provided, in part, that “. . . Monroe County finds that the '3-lane alternative' as described in the Statement of Agency Commitments is the most viable proposal of those considered, because it balances the needs for a widened highway with safeguards designed to address secondary impacts.” The secondary impacts referred to in the resolution included concerns that two southbound lanes would result in more growth. The rationale behind the resolution was that more growth would result from two southbound lanes than from one southbound lane with the proposed passing zones. In response to the request of Monroe County and in response to a similar request made by the District, FDOT notified the District by letter dated September 5, 1996 of FDOT's decision to redesign the project to change the roadway from four to three lanes. FDOT HAS MINIMIZED THE IMPACTS OF THE PROJECT During the PD&E process prior to permit application FDOT studied project needs and alternative alignments, and conducted corridor analyses. FDOT originally considered a proposal that included approximately 250 acres of wetlands impacts. At the District's suggestion, FDOT revised its proposal prior to the permit application to reduce the wetland impacts and project footprint. The application submitted contained approximately 165 acres of impact. FDOT changed the typical section of the proposed roadway again after substantial interagency coordination in an effort to reduce wetlands impacts even further. FDOT agreed to reduce the footprint by changing the design of the median from 22 feet and a Jersey barrier (which is a minimum barrier) to 20 feet with a tri-beam rail barrier. The more substantial barrier was added because the median was narrowed. Additionally, instead of ten-foot paved shoulders on each side of the median, FDOT would use two-foot paved shoulders with sixteen feet of grass in the middle. These minimization efforts resulted in a wetland impacts decrease from 164 acres to 149.07 acres, the current impact of the project. Avoidance, or choosing alternate routes to avoid impacts to wetlands, was not a possible option because only wetlands and open waters exist between the northern and southern terminus of the project. FDOT explored all reasonable alternatives to the proposed project, including a two lane alternative proposed by a consultant for FBII. As discussed below, FDOT did not adopt the two-lane alternative, because the alternative did not address all of FDOT's identified needs for the project. FBII prepared a report with a two-lane alternative to the proposed project. FBII's original proposal included one 12-foot northbound lane with a 10-foot paved shoulder covered with thermoplastic rumble strips to deter vehicular use of the shoulder. In the southbound direction, FBII proposed a 12-foot travel lane with a 4-foot paved shoulder, essentially the same as currently exists. That proposal was analyzed by Metric Engineering on behalf of FDOT. FDOT rejected the FBII alternative for several reasons. First, though the 10-foot northbound shoulder theoretically may be used by cars during hurricane evacuation, removal of the rumble strips would be impractical due to lack of time to do so under threat of a hurricane, and due to the costs involved. It would be unrealistic to require people to otherwise drive over the rumble strips, without removal, because they are designed to prevent such access. Using the 10-foot shoulder during an evacuation would result in there being no shoulder area to remove accident vehicles from the roadway which would otherwise threaten to restrict the flow of traffic or cease it altogether. The reduced width of the shoulder lane below the standard 12-foot lane would also decrease the flow of evacuees. FBII's proposal for a two-lane fixed-height bridge at Jewfish Creek would not completely eliminate rear-end collisions at the bridge. The two-lane alternative proposed by FBII is not a signed and sealed cross section. The proposal by FBII does not include the area necessary for a SWM system or for clear zones. FBII did not do an analysis to determine whether its proposal complies with pertinent FDOT roadway and traffic design standards or with pertinent highway safety and improvement standards. The FBII proposal does not account for removal of the Lake Surprise causeway or construction related impacts from barge traffic. FBII did not do a wetlands survey to determine the impact of its two-lane proposal. At the Final Hearing, Petitioners presented for the first time a new proposal to use "flexible diverters" to pave a third northbound lane and to block that lane from travel traffic with poles. However, no research was conducted into the feasibility of such a proposal, nor was it adequately thought out. Such a use of "flexible diverters" is unprecedented in FDOT's history, is impractical to implement, and would violate FDOT's design standards contained in its Manual on Uniform Traffic Control Devices. Petitioners also presented for the first time at the Final Hearing a proposal to add an 8 to 10 foot paved northbound shoulder which could be converted to a travel lane with traffic control cones in the event of an evacuation. This plan is also not feasible, because the resulting lanes would not be wide enough to safely accommodate evacuating traffic, and because the contradiction between existing road striping and the placement of cones would likely cause accidents, which would halt evacuation. The proposals submitted by FBII do not sufficiently improve hurricane evacuation or traffic safety and, consequently, are not acceptable alternatives to the project. FDOT can do nothing else to minimize the impacts of the project and still address the needs for the project. Minimization of wetlands impacts was accomplished to the greatest extent possible. FDOT has proposed mitigation to offset the impacts that could not be avoided. THE PROPOSED PROJECT - IN GENERAL STIPULATION AS TO DESIGN AND CONSTRUCTION Petitioners stipulated that the design and construction specifications of the roadway proposed to be permitted in this case comply with all applicable design and construction standards for structural integrity, and adequately describe the three-lane divided roadway proposed to be constructed on a four-lane roadbed/embankment. PROPOSED LANES, SHOULDERS, AND MEDIAN FDOT proposes to widen the roadway in the project area to a three lane divided roadway with two northbound lanes and one southbound lane, plus three passing zones. The proposed project will be constructed on a four lane roadbed embankment. FDOT does not presently have plans to add the fourth lane to this roadway. FDOT Exhibit 8 contains an accurate description of the proposed typical section of the roadway. The typical section will consist of two twelve-foot northbound lanes with a six-foot paved shoulder and a four foot stabilized area adjacent to the paved shoulder; a twenty-foot median consisting of a two-foot paved shoulder, sixteen feet of grass and a tri-beam guardrail in the middle as a separator; and one twelve-foot southbound lane with an eight-foot paved shoulder. The proposed typical section also includes a storm water management system that will be described in more detail below. The proposed typical section includes a clear zone thirty feet in width, which is adequate. THE THREE PASSING ZONES The existing passing zone located in Dade County between mile markers 113 and 115 is one mile in length. FDOT proposes to alter this passing zone to 1.44 miles in length. The existing passing zone located in Dade County between mile markers 120 and 122 is also one mile in length. FDOT proposes to alter this passing zone to 2 miles in length. In addition, FDOT proposes to construct a 1.5 mile long passing zone between mile markers 110 and 112 in Monroe County. If permitted, the proposed project will include 2 passing zones in Dade County and 1 passing zone in Monroe County, for a total of 3 passing zones. The total length of the passing zones will equal 4.94 miles. ELEVATION There are no plans to change the elevation of the existing roadway. HYDROLOGIC CULVERTS The project contemplates the construction of 25 hydrologic culverts north of the C-111 Canal. These culverts will remain capped until further hydrological studies are completed and input from all concerned regulatory agencies can be obtained. It has not yet been determined how these culverts will be utilized to maximize the improvement to the ecosystem north of the C-111 Canal. WILDLIFE CROSSINGS INCLUDING THE C-111 BRIDGE The project contemplates the construction of three wildlife crossings north of the C-111 Canal in Dade County with fencing designed to funnel wildlife through the crossing. These crossing, sometimes referred to in the record as “panther crossings” are located between mile markers 118-119, 122-123, and 126-127 and will be constructed as overland bridges. In addition, the replacement bridge over the C-111 Canal (located between mile markers 116-117 in Dade County) is intended to serve as a wildlife crossing and will also employ fencing to funnel wildlife through the crossing. All four of these structures will be constructed as four-lane bridges, but will be striped for three lanes with rumble strips on the southbound fourth lane to discourage vehicular traffic in that lane. There will be an eight foot outside shoulder. FDOT proposes to construct 18 culverts south of the C-111 Canal for crossings by crocodiles, alligators, manatees, and other wildlife. These crossings will consist of 15 box culverts and 3 bridges. MANATEE CREEK BRIDGE The proposed bridge at Manatee Creek would be constructed as a four lane bridge, but would be striped for three lanes with rumble strips on the southbound fourth lane to discourage vehicular travel in that lane. There would be an eight foot outside shoulder. BRIDGING JEWFISH CREEK AND LAKE SURPRISE Jewfish Creek, which is part of the Intracoastal Waterway, and Lake Surprise would be bridged by a continuous structure. The Jewfish Creek bascule bridge would be replaced by a high-level four-lane fixed bridge. The Lake Surprise causeway would be replaced by a low-level four-lane bridge. The total distance for this bridging is approximately 2.35 miles. AREA OF PROJECT THAT WILL BE OPERATED WITH FOUR-LANES The three passing lanes (4.94 miles) and the bridge over Jewfish Creek and Lake Surprise (2.35 miles) would be operated with four lanes. Those areas total 7.29 miles of the 20.4 mile project corridor. Approximately 43 percent of the proposed roadway would have four lanes of pavement. Excluding the areas where the fourth lane will be blocked from travel with rumble strips, only 35 percent of the completed project will contain four travel lanes. This area consists of the three passing zones and the bridges over Jewfish Creek and Lake Surprise. THE PROPOSED SWM SYSTEM The proposed project would provide for a SWM system consisting of inlets, culverts, swales, berms and dry/wet retention areas. For the typical roadway section, runoff from the paved roadway surfaces will be directed to roadside swales designed to provide retention for 50 percent of 2.5 inches times the impervious area. The SWM system for the bridges will collect runoff in inlets and culverts and direct it to either swales or dry or wet retention ponds. The berms of the SWM system provide additional protection by restricting spills of pollutants, such as petroleum from overturned tankers or other vehicle accidents, from running into the surrounding waters. The berms and swales of the SWM are designed to catch pollutants and prevent their discharge into the surrounding waters. FDOT Exhibit 18 consists of four separate drainage reports submitted to the District in 1995 in connection with the project, one report for each section of the project. The reports accurately document the drainage calculations, the drainage design, the rationale behind the drainage design, and compliance of the design with the laws and regulations of the permitting agencies for the original four-lane proposal. On or about September 5, 1995, FDOT submitted revised drainage calculations to the District, determining the amount of stormwater treatment for the three-lane project. The revised calculations established that at least 95% percent of all stormwater runoff from the project would be captured in the proposed SWM system. Because the swale design was based on the originally proposed four-lane road, retention will be in excess of the required volume for most sections of the roadway. The required retention volume for this project is approximately 166 percent of what is required by the BOR. The surface and subsurface geology of the roadway consists of Miami oolite limestone overlain with Perrine maral. Underlying this is Thompson formation, anastasia and Key Largo limestone. Based on these constituencies, the swales proposed by the SWM system would be effective in rapidly removing heavy metals and phosphorous. The revised calculations established that approximately five percent of the project area will not have a SWM system. These areas will not have a SWM system because properly-sized retention systems in those areas can not be constructed without causing a disproportionate, adverse impact to surrounding wetlands. FDOT has provided reasonable assurances that the proposed SWM system’s total water quality treatment exceeds the District's permitting requirements and provides sufficient treatment to exceed the BOR requirements. The water discharged from the proposed system would be of higher quality than that currently discharged, which is not treated. FDOT has provided reasonable assurances that the proposed SWM system complies with the permitting criteria found in Rule 40E.301(1)(a)-(p), Florida Administrative Code. The following findings are made as to that criteria. Rule 40E-4.301(1)(a), F.A.C. The parties stipulated that Rule 40E-4.301(1)(a), F.A.C., pertaining to flood protection and the adequacy of drainage, is not at issue in this proceeding. Rule 40E-4.301(1)(b), F.A.C. The quality of water being discharged from the SWM system will be of substantially higher quality than the existing discharges. Consequently, it is concluded that the system will not cause adverse water quality impacts within the meaning of Rule 40E-4.301(1)(b), F.A.C. In addition, the evidence established that there will likely be less water discharged from the roadway if the project is constructed because of the amounts of water that will likely be retained in the swales that are a part of the SWM systems. Rule 40E-4.301(1)(c), F.A.C. Because the receiving bodies of water are designated Outstanding Florida Waters, the District is required to apply the DEP's most stringent water quality requirements -- the antidegredation requirements for discharge to OFWs, to this project. Those standards will be discussed in more detail below. The evidence established that the proposed project will not violate those requirements. Rule 40E-4.301(1)(d), F.A.C. Impacts to sources of water are not at issue. The District reviewed the potential effect of the SWM system upon on-site and off-site impacts to surface or groundwater levels and flows. The evidence supports the District's conclusion that no adverse impacts will be caused. Petitioners failed to present any evidence on groundwater levels and flows. Consequently, it is found that the criteria found at Rule 40E-4.301(1)(d), F.A.C., has been satisfied. The 25 hydrologic culverts north of C-111 have the potential to re-establish historic surface water flow in the area. They were sized, based on rainstorm events, to help equalize water levels from one side of the road to the other. The culverts are capable of transferring water from west to east to assist in the historic restoration of flows. In order to assure the proper usage of the culverts, they will remain gated until the District develops a management plan in conjunction with other agencies. The District will determine the maintenance entity. The FKAA water main runs beneath this section of the road. As a result, there is no other more hydrologically efficient alternative for the placement of the culverts. The culverts would also provide a means for overwash from storm events, over the U.S. 1 roadbed, to flow back to its point of origin, stabilizing the roadbed and allowing release of the accumulated salt water. Rule 40E-4.301(1)(e), F.A.C. In addition to providing for a net improvement in water quality, the project will offset any adverse impacts through mitigation and other environmental enhancements for which no mitigation credits are being assigned, as described below. Rule 40E-4.301(1)(f), F.A.C. FDOT has a history of adequate maintenance of SWM systems, and has provided reasonable assurance that it has the staff and budget to comply with District operation and maintenance requirements. FDOT will also be able to comply with the District's requirements to control exotic plants and other foliage along project corridor. Rule 40E-4.301(1)(g), F.A.C. The SWM system will not adversely affect public health and safety. The dispute as to the public interest test focused more on the WRM permitting requirements. Findings as to the public interest test are discussed in more detail below. Rule 40E-4.301(1)(h), F.A.C. The evidence established that the SFM system is consistent with State Water Policy. Rule 40E-4.301(1)(i), F.A.C. This project does not pertain to a DRI and, consequently, this criteria is not applicable. Rule 40E-4.301(1)(j), F.A.C. There are no basin criteria applicable to this project. Rule 40E-4.301(1)(k), F.A.C. The evidence established that the SWM system will not be harmful to the water resources of the District. While there will be adverse environmental impacts caused by the project, those adverse impacts have, as will be discussed in more detail below, adequately offset by mitigation. Rule 40E-4.301(1)(l), F.A.C. This issue was not at issue in this proceeding. Rule 40E-4.301(1)(m), F.A.C. As will be discussed in greater detail in a subsequent section of this Recommended Order, the project is not against public policy. For the reasons set forth in that subsequent section, it is found that the project is clearly in the public interest. Rule 40E-4.301(1)(n), F.A.C. Rule 40E-4.091(1)(a), F.A.C., constitutes the BOR. As discussed in detail above, the SWM system complies with the BOR. Rule 40E-4.301(1)(o), F.A.C. There are no isolated wetlands pertaining to this project. Rule 40E-4.301(1)(p), F.A.C. There are no above ground impoundments, as described in Appendix 6 of the BOR, pertaining to this project. WATER QUALITY - DISCHARGES INTO OFW Because the project will involve discharges into Outstanding Florida Waters, it was necessary for FDOT to establish that the discharges from the SFW system will not degrade those OFWs. The evidence established that FDOT's proposed project complies with and exceeds applicable water quality standards and permitting criteria. There will be no significant degradation of ambient water quality as a result of the project. It is expected that there will be a net improvement in ambient water quality resulting from the proposed project, as opposed to the continued degradation if nothing is done to treat stormwater runoff. In FDOT Exhibit 46, FDOT provided baseline water quality data in the form of STORET data for waters adjacent to the project area. STORET is a centralized repository and database for water quality data throughout Florida. It is Florida's principal source of water quality data. STORET contains the best scientific database on water quality in Florida. The STORET data set forth in FDOT Exhibit 46 provided sufficient evidence on ambient water quality for the waters adjacent to the proposed project. In addition to providing the water quality data in FDOT Exhibit 46, FDOT is required by Special Permit Condition 37 to submit appropriate water quality data in the surrounding waters prior to any construction activities. SFWMD Exhibits 5 and 6 contain amendments to Proposed Agency Action made after the beginning of the formal hearing. These amendments include a requirement that an appropriate water quality monitoring plan be submitted within 30 days of the permit issuance. FDOT has provided reasonable assurances that water quality standards will be met and that there will be appropriate water quality monitoring during construction. DIRECT IMPACTS OF THE PROJECT The proposed roadway design will result in the following direct impacts to wetlands adjacent to the roadway corridor: 1) the dredging of 11,028 cubic yards of material from 2.1 acres, 2) the placement of 1,689,553 cubic yards over 147.0 acres of wetlands, and 3) 6.9 acres of (potential) permanent impact due to shading and 4.1 acres (potential) of temporary impacts from the Jewfish Creek Bridge construction activities to seagrass habitat. In order to determine the project's direct impacts, the area surrounding the project was surveyed to determine the number of affected acres. This was done by using a computer aided design ("CAD") system, and by categorizing the various forms of wetlands and associated flora and fauna into the following communities: mangrove, emergent freshwater, open water, and tidal, consisting of seagrass and non-vegetated bottoms. Using these categories and the CAD system, every square foot of direct impacts were accounted for. The adverse direct wetland and surface water impacts of this project are as follows: 1) 27.83 acres Non- Vegetated Tidal Bottom; 2) 11.27 acres Seagrasses; 3) 46.85 acres Mangroves; 4) 42.35 acres Sawgrass/Cattail/Spikerush; 5) 14.31 acres Shrub Wetlands; and 6) 6.46 acres Open Fresh Water; totaling 149.07 acres. Though some wetlands to be impacted may be of lesser quality, FDOT stipulated that all wetlands to be directly impacted by the project should be considered to be high quality wetlands for the purpose of mitigating the impacts. The impacted wetlands are part of larger wetland systems. Petitioners assert that the District should have required studies as to impacts as to the larger wetland systems. The evidence established that the District appropriately considered the type and location of the wetlands involved so that additional study suggested by Petitioners was unnecessary. Petitioners also assert that impacts to isolated wetlands should have been studied. The evidence established that there will be no such impacts. SECONDARY AND CUMULATIVE IMPACTS RECOGNIZED BY SFWMD In addition to the direct impacts of the project, the District is required to analyze secondary and cumulative impacts. A project's secondary impacts are those that, though outside of the project footprint, are very closely linked and causally related to the project. This is a "but for" test. Secondary impacts are those impacts which, if not for the proposed project, would not occur. Both positive and negative secondary impacts are considered. When there are both positive and negative secondary impacts caused by a project, the permitting agency must consider the severity of the impacts and balance these together with the other factors in the public interest test to determine whether or not the project is clearly in the public interest. WRM statutes, and DEP rules and policies pertaining to those statutes do not regulate growth or traffic increases, per se. Only if such increases are very closely linked and causally related to the project will they be considered. The District identified several secondary impacts that would be temporary in nature since they would occur while the project is being constructed. One is the use of a barge facility, primarily at Jewfish Creek, where the anchoring of the barge may result in temporary impacts to seagrass during construction. This impact is addressed by a component of the seagrass mitigation at Boca Chica, discussed below. Another impact is turbidity associated with the dredge and fill and the barge activities. That issue is appropriately addressed by permit conditions, through the use of turbidity control screens and other techniques. The District also identified secondary impacts directly associated with the project footprint that would be permanent in nature. The removal of the exotic vegetation potentially opens up the areas adjacent to the road north of the C-111 canal to off-road vehicles or four-wheel driving and the potential impacts caused by those vehicles. That impact is appropriately addressed by fencing north of the C-111 canal. When a road is widened, animals have a greater distance to travel back and forth from one side of the road to the other. A wider road exposes such animals to greater risk of being hit by a motor vehicle while crossing the road. That impact is addressed in this project by the fencing, the wildlife crossings, and the wildlife box culverts. The crossings are designed for large mammals and some species, such as the Indigo snake, will likely not use these crossings. The wildlife crossings will not entirely mimic the crossing patterns of all wildlife that need to cross U.S. 1 and will result in some wildlife habitat fragmentation. The fencing that will be erected to funnel wildlife through the crossings will fragment the habitat of some species by altering wildlife crossing patterns and blocking access of some species to certain areas of habitat. The greater weight of the evidence established that any habitat fragmentation should, when compared to existing conditions, be minimal. The District appropriately evaluated the advantages and disadvantages of using wildlife crossing and hydrological culverts and appropriately concluded that there would be a net benefit to wildlife as a result of their construction. The District properly concluded that the culverts, bridges and fencing located south of the C-111 canal, construction of wildlife crossings and fencing north of the C- 111 canal, construction of the hydrologic culverts, and removal of the Lake Surprise Causeway are positive secondary benefits of the project. These benefits should be considered when applying the public interest test. THE FKAA PIPELINE RELOCATION The project requires the relocation of two segments of the existing pipe owned by the Florida Keys Aqueduct Authority (FKAA) around Jewfish Creek Bridge. The segments total approximately 1.5 miles. The District inspected the area where the pipeline will be relocated to assist in determining its impact. The pipeline relocation is a temporary disturbance during construction. It is a small linear facility, which will not generate pollution in and of itself. The pipeline relocation is not expected to result in a violation of State water quality standards. The FKAA is responsible for obtaining the necessary permits for the relocation. Direct impacts to wetlands will occur in a 4 to 5 foot wide strip along the length of the relocated aqueduct. The FKAA has submitted a permit application to the DEP for a permit to relocate the aqueduct. DEP believes that adequate mitigation can be achieved to make the project permittable. Once the FKAA submits an adequate mitigation plan, then relocation of the aqueduct will not be an adverse secondary impact caused by the U.S. 1 project. The permit for the subject project should contain a condition that the FKAA obtain a permit for the relocation of these two segments of its pipeline. THE C-111 BOAT RAMP There is an existing boat ramp designed for small boats to access District canals that is located on the north side of the C-111 canal. As a result of the proposed project, it will be relocated to the southern side of the project. This relocation is a relatively minor project requiring a cut in the canal bank and a fourteen-foot wide slab for the boat ramp. When the District considered the potential impacts associated with this relocation in conjunction with the impact of the proposed project, it was determined to be a relatively insignificant impact in terms of the project as a whole. Relocation of the boat ramp is not expected to result in a violation of state water quality standards. All direct, cumulative, and secondary impacts, whether positive or negative, should be considered in balancing the public interest test. ARE THERE ADDITIONAL SECONDARY AND CUMULATIVE IMPACTS Petitioners assert that there are additional cumulative and secondary impacts that the District failed to consider. Petitioners argue that the project cannot meet permitting criteria if those additional impacts are considered. The additional impacts pertain to additional development throughout Monroe County because of the “rate of growth ordinance” (ROGO), additional development along the project corridor, impacts to the coral reefs of the Keys, impacts to Key Deer, generalized impacts, and impacts from increased number of “day trippers." For the reasons discussed below, it is found that the District has considered all appropriate direct, secondary, and cumulative impacts of the project. The additional impacts that Petitioners assert should have been considered are not causally connected or directly linked to the project. THE RATE OF GROWTH ORDINANCE Monroe County adopted its Year 2010 Comprehensive Plan (the "Plan") to meet the requirements of Chapter 163, F.S. The Plan, adopted May 15, 1993, is unusual in that the County limits future growth based on a carrying capacity analysis of its hurricane evacuation clearance time. No other jurisdiction in Florida, and few others in the United States, have used a carrying capacity planning approach. To implement the carrying capacity limitation, Monroe County determined the total number of dwelling units that could be permitted while maintaining an acceptable hurricane evacuation clearance time of 24 hours. This number of dwelling units, less an allowance for vested development and development in municipalities, was the basis for a ROGO that was adopted by the County in 1992. The ROGO allocates the available units at a uniform annual rate of growth (currently, 255 units per year). The ROGO regulates all proposed new residential buildings, including hotels, motels, and other transient tourist accommodations as well as permanent residences. The number of building permits that Monroe County can issue is, at present, directly related to how rapidly the County can be evacuated in the event of a hurricane. The lower the clearance time, the greater the number of permits that can be issued. The Comprehensive Plan requires that the County be able to evacuate within a 24-hour period. As of March 7, 1995, the hurricane evacuation time for Monroe County was determined to be 21.25 hours.1 The project is expected to reduce by six or seven hours the modeled hurricane evacuation capacity for Monroe County, regardless of whether it consists of three or four lanes. This is because both the three lane and four lane plans provide for two northbound lanes. Because of the rate of growth provisions in county law, this reduction of clearance times results directly in an increase in the number of building permits that the county can issue annually. Under ROGO, Monroe County can, with this project, issue 255 permits each year through the year 2026. Without this project, Monroe County can issue 255 permits each year only through the year 2001. Alternatively, without this project, the county can issue 88 permits each year through the year 2010 if it chooses to issue permits over a longer period of time. Following extensive litigation before the Division of Administrative Hearings in an unrelated proceeding2, the Administration Commission entered a final order on December 12, 1995, that approved approximately 97 percent of the Plan. In addition, the Administration Commission has published a proposed rule to bring the remainder of the Plan into compliance and assure its financial feasibility. The central feature of the proposed rule is a five- year work program, with annual reviews by the Administration Commission. It is likely that the proposed rule will eventually result in the complete revision of the ROGO. The proposed rule provides that Monroe County's annual rate of growth be revised within five years, no later than December 31, 2001, "to establish a rate of growth and a set of development standards that ensure that any and all new development does not exceed the capacity of the county's environment and marine systems." A carrying capacity study will comprehensively assess water quality, habitat protection, and public facility issues to determine the capacity of the Keys to sustain further development. The proposed project is but one of many factors that will be considered in future rate of growth regulations. If the expected revisions occur, it would be speculative to predict what development would be allowed. While the studies are underway the rate of growth will remain at 255 units per year. The rate of growth will be reviewed annually, and may be reduced a minimum of 20% if the goals of the studies are not being met. The DCA has determined that Monroe County’s Comprehensive Plan and its land development regulations are sufficient to prevent or mitigate any potential adverse secondary impacts of the project caused by development. The DCA has consistently supported the proposed project, even in its earlier four-lane configuration, because it was consistent with Monroe County's 1986 Comprehensive Plan, and because the project would improve hurricane evacuation clearance times and improve water quality in the vicinity of the roadway. The 1986 plan supported widening of the roadway to four lanes based on projected travel demand. The DCA prefers the current, three-lane proposal to the earlier four-lane. On September 7, 1995, the Monroe County Commission adopted Resolution 315-1995 in support of the proposed project because "it balances the needs for a widened highway with safeguards designed to address secondary impacts." Lorenzo Aghemo, an expert in comprehensive planning, served as Monroe County Planning Director during the development of the Plan and ROGO. In Mr. Aghemo's opinion, the widening of the roadway to either three or four lanes would generate minimal growth pressure in Monroe County, particularly because the Plan limits the rate of growth. Because the Keys are designated by Section 380.0552, F.S., as an area of critical state concern, the DCA is charged with oversight of Monroe County's Comprehensive Plan, its LDRs, and all development that takes place in Monroe County. Additionally, the Administration Commission may amend Monroe County's plan or regulations by rule (See Section 380.0552(9), F.S.). There is virtually no action that Monroe County can take related to the use of land without review and approval of a state agency. The Administration Commission’s proposed rule demonstrates its intent to revise comprehensively Monroe County's ROGO within five years to ensure that future development does not exceed the capacity of the Keys' environmental resources. It also demonstrates the Administration Commission's intention to closely monitor growth and development in the Keys during the five-year study period. Some of the studies required by the proposed rule are already underway: 1) the DCA has entered into a contract with the ACOE to complete the environmental carrying capacity study; 2) the HRS study of advanced on-site waste water treatment systems is underway; 3) Monroe County is developing the required Marathon central sewer facilities plan; and 4) Monroe County and HRS have begun the cesspit identification and elimination process. Caution should be exercised in relying on this or on any other proposed rule. Likewise, caution should be exercised in relying on changes to ROGO that may or may not occur. It is likely that the present status of the law will be changed in the near future so that future development will be based on environmental carrying capacity as opposed to hurricane evacuation clearance times. However, for the purposes of this proceeding the District should accept the fact that the issuance of future building permits is closely linked and causally related to the project. Consequently, it is found that under the present status of the law, the issuance of additional building permits in Monroe County is closely linked or causally related to the project. MONROE COUNTY LDRS AND DCA OVERSIGHT Although Petitioners established that there is a causal relation between the project and the existing status of the law governing the number of building permits that can issued in the future, the evidence was insufficient to establish at a level above speculation that adverse environmental impacts will result because of the issuance of those building permits. The Monroe County Comprehensive Plan contains land development regulations that govern all development in Monroe County. These regulations are among the most stringent in the State and are designed to avoid or minimize adverse environmental impacts caused by development. All development orders in Monroe County are closely scrutinized by the Department of Community Affairs to ensure compliance with applicable permitting criteria. Those regulations and the DCA’s close scrutiny are intervening factors that break any causal relation between the project and the speculative adverse environmental impacts that the Petitioners assert will be caused by future issuance of building permits by Monroe County. Petitioners failed to establish that the impacts of future development are very closely linked or causally related to the project. Consequently, it is found that such impacts are not secondary or cumulative impacts of the project. DEVELOPMENT ALONG THE PROJECT CORRIDOR A major portion of the area next to the road has little or no development potential because it is either water, land in public ownership, or land slated for public ownership. The areas east of the road are mostly in private ownership, but are primarily submerged lands and mangrove areas. The Crocodile Lakes National Wildlife Refuge is federally owned and is managed by the U.S. Fish and Wildlife Service (USFWS). The Southern Glades lands, located immediately west of the project and Everglades National Park (ENP) in Dade County, have been acquired by the District and are managed by the Florida Game and Freshwater fish Commission (FGFWFC). The Model Lands Basin in Dade County is in private ownership but proposed for public acquisition in the future. The land adjoining the roadway in Dade County is designated as open area or environmentally sensitive. Almost half of the land along Monroe County's portion of the roadway is in public ownership. At least 90% of the land in private ownership is mangroves or wetlands that cannot be developed. The small area of uplands is currently being used by a resort marina which will not be allowed to develop further under the new comprehensive plan. There is very little potential for future development in the project area. The comprehensive plan designation for areas in Dade County are open space, and the ones in Monroe County have the conservation designation. The District's regulatory programs consider areas adjacent to the project as sensitive wetland habitats. Based on the District's regulatory authority and comprehensive plan designation for those lands, which would have to be obtained prior to obtaining a permit for development, it is very unlikely that those lands could be developed. Florida Rock and Sand Co. (FRS) has a permit to mine approximately 1,100 acres of wetlands. As part of its mitigation program, FRS will donate this land to the District once its mining and mitigation projects are complete. The FRS mitigation lands are preserved as a permit condition and will ultimately be transferred to the District. This land will not be developed. In addition, the District established that the U.S. 1 project and the FRS project do not constitute a cumulative impact that the District failed to consider. The evidence established that development along the project corridor will not be a secondary or cumulative impact of the project. IMPACTS ON CORAL REEF SYSTEM The evidence was insufficient to establish a close link or causal connection between the project and the coral reef system. As reflected elsewhere, it is found that there will be no degradation of ambient water quality as a result of the project. Therefore, there is no need to resolve the conflicting testimony as to the present status of the coral reef system. IMPACT ON KEY DEER There are no key deer in the project area. The nearest key deer habitat, Big Pine Key, is approximately 70 miles from the southern terminus of the project. The evidence is insufficient to establish that there is a very closely linked and causally related connection between the project and key deer mortality on Big Pine Key. GENERALIZED IMPACTS The Petitioners presented certain opinion testimony that the Keys cannot be developed in an environmentally sensitive manner because of potential adverse impacts of new development in Monroe County, or new boats operating in the waters of the Florida Keys. The credibility of that testimony need not be evaluated because the evidence was not sufficient to tie those generalized concerns into the specific regulatory criteria of the permitting agency. There was insufficient evidence to establish that those alleged impacts would be very closely linked or causally related to the proposed project. DAY TRIPPERS Induced demand is new travel that occurs solely because additional capacity is added to a highway. Petitioners' transportation experts, Michael Replogle and Robert Morris, testified that FDOT's traffic studies, and FDOT's projected rate of traffic growth of approximately 3 percent annually, are incorrect because the studies do not predict the amount of "induced demand" that would result from the proposed project. Petitioners assert that induced demand would generate an unknown number of people who drive to the Keys for the day from south Dade County, referred to as “day trippers,” will have an impact on the Keys that has not been evaluated. The assertion that this potential impact has not been analyzed is rejected as being contrary to the greater weight of the evidence. Induced demand is accounted for in Monroe County's Long Range Transportation Plan, which was never evaluated by Mr. Replogle or Mr. Morris. The Long Range Transportation Plan was prepared by an experienced traffic engineering consulting firm, Barton-Aschman, using an FDOT- approved traffic demand model, the FSUTMS model, that includes all traffic generators and attractors, and all travel on U.S. 1 on weekdays and weekends. The FSUTMS model does not restrict demand based on the existing road capacity. The model uses an "unrestrained assignment" that incorporates the total predicted trip generation on recreational facilities, hotels, and all other attractors. The Long Range Traffic Plan was used to develop the Monroe County Comprehensive Plan, which takes into consideration the projected increases in traffic and makes appropriate provisions for those increases. FDOT has provided reasonable assurances that it has properly projected the amount of traffic for the project corridor after the project is completed and that the projected increases have been appropriately addressed by Monroe County's Comprehensive Plan. MITIGATION - IN GENERAL For the reasons discussed above, it is found that there are no secondary or cumulative impacts that the District failed to consider. Petitioners also contend that the mitigation proposal is insufficient to offset the direct and secondary impacts recognized by the District. This is a large dredge and fill project that will permanently fill 149 acres of wetlands. The wetlands that will be adversely impacted by the project include OFWs that provide a great variety of functions and serve as habitat for fish and wildlife, including threatened and endangered species. The wetlands are unique and of high quality. Mitigation for direct, secondary and cumulative impacts was considered as part of the permit evaluation. In- kind mitigation is considered to be most effective, but out- of-kind mitigation may be offered by the applicant where it is impractical to conduct in-kind mitigation due to historic changes in the project area or sensitivity of the habitat type for which mitigation is offered. Such mitigation is also appropriate to address regional alteration of an ecosystem, such as the Everglades ecosystem alteration caused by the original roadway embankment. FDOT developed a conceptual mitigation plan that took into account project impacts on the freshwater, marine and estuarine components of the ecosystems involved, as well as the impacts on threatened and endangered species of wildlife which may be affected by the project. FDOT coordinated the plan's development with the National Parks Service, U.S. Fish and Wildlife Service, the Army Corps of Engineers, the National Marine Fisheries Service, the U.S. Environmental Protection Agency, the Dade County Department of Environmental Resources Management, the Florida Game and Fresh Water Fish Commission, and the Florida Department of Environmental Protection. The conceptual mitigation plan evolved as a result of project modifications and agency comments into what is now proposed as mitigation for the project. The current proposal is summarized in FDOT Exhibit 26, consisting of Attachment H to FDOT's SWM and WRM permit applications. The timing of their construction falls into two general categories: mitigation previously permitted and concurrent mitigation. UPFRONT MITIGATION Typically, mitigation is done concurrently with project construction rather than prior to permit issuance. Mitigation is often done afterwards because of construction timing constraints. Here, FDOT applied for and, in May 1994 received, permits to conduct mitigation prior to applying for the permits at issue, with the understanding that performance of these activities does not require the District to issue permits for the proposed projects. A total of 385.22 acres of mitigation has already been completed. The applicant received 203.02 mitigation credits from the District on May 12, 1994, for several mitigation projects that the applicant proposes to apply to the proposed U.S. 1 widening project provided it is approved. Table 2 of Attachment H to FDOT Exhibit 26 sets forth the four mitigation projects that constitutes the up- front portion of the mitigation for the project. This table sets forth the acres mitigated, the conversion factor for the mitigation, and the resulting mitigation credit awarded. The four mitigation activities already authorized are: enhancement of the wetland habitat in the Harrison Tract located adjacent to Barnes Sound within the Crocodile Lakes National Wildlife Refuge on the north end of Key Largo (70.37 acres credit for 252.6 acres of restoration); removal of the spoil mounds on the eastern bank of the C-111 canal east of U.S. 1 located on the District’s ROW (10.65 acres credit); the back filling of the C-109 canal levee located on the District ROW within the Southern Glades Save Our River project (112.7 acres credit); and the removal of the roadside spoil mounds on the west side of U.S. 1 located between C-111 and the Dade Work Camp Road within the District’s Southern Glades Save Our Rivers Project (9.30 acres credit). The mitigation projects pertaining to the roadside spoil removal along U.S. 1, the backfill of the C-109 Canal, and the removal of spoil along the C-111 Canal are similar projects because they each involve existing deep ditches cut through wetlands. When these deep ditches were cut, the spoil material from the ditch was deposited alongside the ditch. This resulted in areas that were previously Everglades wetlands becoming spoil, supporting the growth of exotic species and, for the most part, not exhibiting wetland functions. FDOT is proceeding with the backfilling the C-109 canal located between mile markers 122.5 and 117, and removal of the corresponding spoil mounds created during construction of the C-109 canal. In connection with this mitigation, marsh areas, tree islands and deep water aquatic refugia have been restored. In this area, there has been considerable attraction of wildlife subsequent to restoration, including otters, alligators, and turtles, which could not previously use the habitat because the canal was too deep. Upon completion waterflow between the east and the west will be restored, and the area will be restored to a wetland habitat from its current uplands habitat type. Backfilling of the C-109 canal is part of an interagency effort with the ACOE to restore as closely as possible to natural conditions the flow of water in the C-111 watershed area. C-111 mitigation includes removal of roadside spoil along the C-111 canal to restore the natural condition of the area. The mitigation was devised in coordination with the National Maine Fisheries Service (NMFS), which required mitigation for non-vegetated habitat types. Restoration also includes preserving some spoil areas as islands to maintain habitat for endangered species of plants. When the C-111 spoil mounds are scraped down, the fill will not fill the whole ditch. The ditch will, therefore, be a bit more valuable but will not be completely restored to its former elevation. FDOT will also remove roadside spoil along the west side of U.S. 1, upon which exotic species of plants had grown, and returning the area to its original grade. The Harrison Tract is a known habitat and nesting area for American crocodiles. Its wetlands functions were altered or eliminated by prior development of the land by its original owners. Restoration includes regrading the area to restore its original wetlands functions, including habitat for young and adult crocodiles. FDOT's mitigation of the Harrison Tract also includes restoration of tidal flushing to increase contributions of nutrients and food sources to the surrounding tidal bay system. Crocodiles have been observed using the restored areas. FDOT has installed additional nesting berm habitat, basking habitat and shallow lagoon habitat to promote juvenile crocodile development. The District established that the credit awarded for this mitigation and the conversion ratios utilized for determining this credit were consistent with agency practice and its pertinent rules. FDOT was given a 1:1 credit ratio for areas involving full restoration of wetlands. In other portions of the Harrison Tract mitigation involving restoration of flushing to existing wetlands, FDOT was given not full credit, but credit based on the severity of limitation of the existing wetland functions. Based on this evaluation, mitigation credits were given in a range of a 3:1 ratio for restoration of severely disrupted or non-existent wetlands to a 20:1 ration for restoration of higher quality but not fully functional wetlands. FDOT is being awarded 70 mitigation credits for the 252 acres in the Harrison Tract that are being restored or enhanced. CONCURRENT MITIGATION Based on the mitigation ratios developed by the District, additional mitigation credits were required. Consequently, the project contemplates mitigation that will be undertaken concurrently with the construction of the project in addition to the upfront mitigation. FDOT proposes to earn these additional credits by projects involving creation and/or restoration of emergent vegetation, mangrove and seagrass habitats. FDOT’s proposal to mitigate mangrove impacts with "out of kind" mitigation of emergent vegetation habitats was viewed by the District as being necessary and appropriate because there were no sufficiently large areas of mangrove habitat suitable for restoration. Table 7 of Attachment H to FDOT Exhibit 26 sets forth the four mitigation projects that constitutes the concurrent portion of the mitigation for the project. This table sets forth the acres mitigated, the conversion factor for the mitigation, and the resulting mitigation credit awarded. In addition, the table references certain credit for the placement of the hydrological culverts. As will be discussed later, that credit was withdrawn at the formal hearing. The four mitigation activities that will constitute the concurrent portion of the mitigation plan are: the removal of the Lake Surprise causeway (2.90 acres credit); the scrape down of the Jewfish Bridge approaches (0.67 acres credit); the restoration of the FGFWFC road (10.34 acres credit); and the Boca Chica project (27.17 acres credit) The Lake Surprise Causeway removal mitigation involves 5.26 acres of on-site seagrass restoration and 0.54 acres of unvegetated bottom mitigation through the excavation of 52,220 cubic yards of material. Lake Surprise historically was a shallow tidal lake supporting seagrasses before a causeway was built across the lake over the seagrasses. FDOT proposes to remove the causeway and restore the previous elevation, after which it is anticipated that seagrasses that grow on the east side of the causeway will fully recruit naturally to the excavated area. Removing the Lake Surprise Causeway will establish 5.26 acres of seagrass, for which FDOT received 2.63 acres of on-site mitigation credit based on a 2:1 ratio. Through natural recruitment after removal of the causeway, there is a high likelihood that the entire 5.26 acres will recolonize with seagrass. FDOT minimized the seagrass impacts to the greatest extent possible. The mitigation credit pertaining to Lake Surprise does not include credit for the removal of the causeway itself. This awarded credit is for the restoration of seagrass areas. The mitigation pertaining to the Jewfish Creek Bridge approaches proposes the scrape down of 1.33 acres of existing fill to allow the area to become recolonized with mangroves. Boca Chica is located in southern Monroe County over one hundred miles from the southern terminus of the project. This site was chosen by FDOT as a site for seagrass mitigation project after FDOT reviewed several other potential sites. Two other sites were rejected. The area around the C- 111 canal was rejected because the land proposed for use was in private ownership. Several defunct marinas in Port Bougainville were rejected due to poor conditions not conducive to seagrass growth. Boca Chica was finally chosen as the site because it was a large enough area with light and hydrological flow conditions conducive to seagrass growth. The evidence establishes that the Boca Chica site is the most viable for seagrass mitigation. The seagrasses to be impacted at Lake Surprise are healthy and productive turtle grass, manatee grass and cuban shoalgrass. Turtle grass is considered an extremely valuable “climax community” of seagrasses which hold sediments in place, cleanse water quality, and forms the base of the food chain. It is valuable to sea turtles, manatees and recreationally important fish and shellfish. The cuban shoalgrass that will colonize at Boca Chica is a pioneer colonizer species that grows in disturbed areas. It is not as valuable to the marine system as turtle grass. The Boca Chica seagrass mitigation permit condition proposed to offset impacts to 11.27 acres of seagrass. This will involve the removal of 306 cubic yards of sediment and hydraulically dredging approximately 1,175 cubic yards of spoil material. The proposed permit conditions state that FDOT shall provide future maintenance of the culvert areas to maintain adequate flushing. FDOT will plant 25.92 acres of seagrasses to mitigate for the remaining 8.64 acres of impacts, for a mitigation ratio of 3:1. In addition, 8.46 acres of seagrass will be planted to mitigate for the barren bottom area that will be affected, and 1.62 additional acres will be planted to compensate for any unexpected impacts to Boca Chica based on the necessary improvements. Overall, there will be of 36 acres of seagrass mitigation by FDOT, for which FDOT is receiving 27.17 acres credit. FDOT will also increase the water flow between the east and west lagoons of Boca Chica, and maintain the culverts connecting the two sides, in order to further promote growth of seagrass therein. FDOT is responsible for 80% survival of each acre of seagrass mitigation, as well as monitoring once a year for five years. Based on historical data obtained from Boca Chica during past mitigation efforts, there is a high likelihood that the entire 36 acres of mitigation will survive, and that the remaining 74 acres of the Boca Chica lagoons will experience natural recruitment of seagrass as a result of FDOT's efforts. The FGFWFC access area was built by excavating a ditch, and putting fill on the wetlands and creating a dirt road bed. After the C-109 canal is backfilled, the access road will no longer be needed. The mitigation project will excavate the existing road bed, back fill it into the ditch, thereby recreating the wetlands that were there previously. FDOT will receive 10.34 mitigation credits based on a 1:1 ratio of acres restored. EVALUATION OF MITIGATION There is no mitigation in this permit for any wetland impact beyond the direct loss of the specific 149 acres that will be dredged or filled. Mitigation was provided only for the direct, footprint impacts of the project. None of the up front mitigation involves the creation of wetlands, which entails converting areas that were not previously wetlands or open water and turning them into wetlands. It will likely take between 20 and 50 years for the mitigation areas to achieve full functional value required by the South Florida Water Management District mitigation permit. In the interim, there will be a net loss of wetland functional value. With time, the proposed mitigation has a high likelihood of success. Based on FDOT's past successes in mitigation of construction-related impacts, FDOT is able to comply with permit conditions relating to best management practices associated with the construction of bridges and pilings and turbidity screens around road construction, as well as restoration of seagrasses and mangroves. Petitioners assert that the District erred in determining the credit to be given for the up-front portion of the mitigation. While it is true that the SFWMD Rules do not mention "up-front" mitigation, the District has the authority to consider all aspects of a mitigation project in weighing its relative value. Consulting engineering inspectors have been retained by FDOT to insure that all permitting requirements are met during mitigation and construction, and that the technical special provisions for protection of threatened and endangered species are complied with by FDOT. The proposed permits contain appropriate conditions that require FDOT to monitor and maintain the mitigation areas. FDOT will be responsible in perpetuity for maintaining the tidal flushing connection at the Boca Chica mitigation site. Special permit condition 6 to the SWM and WRM staff reports require wetland and upland monitoring. If wetland and upland monitoring or other information demonstrate that additional adverse impacts have occurred due to this project, FDOT would be required to offset the loss of any additional wetland impacts. MITIGATION IS APPROPRIATE The evidence established that the mitigation projects were fairly and appropriately reviewed by SFWMD and that the mitigation credits were fairly and appropriately awarded. The evidence also established that there is appropriate mitigation for the direct, secondary, and cumulative impacts of this project. ACTIVITIES NOT RECEIVING MITIGATION CREDIT Mitigation credits for the 25 hydrologic culverts north of C-111 were originally included in the permit staff reports. Those mitigation credits were removed in an addendum to the staff reports, introduced as District's Exhibits 5 and 6. These credits were not necessary to offset project impacts. After the staff report was issued, they became a point of contention by the Petitioners because they will not be utilized until a management plan is developed. Since they were not necessary to meet mitigation requirements, the credits were removed from this project. These credits were never included in the mitigation ratios for these permit applications. The addendum removed the 9.6 credits initially contemplated for the culverts. No credit has been awarded for the relocation of threatened and endangered species of plants, such as Joewood and Bay Cedar by FDOT from the C-111, C-109 and roadside spoil mitigation areas. These species have been relocated to tree islands constructed by FDOT on the mitigation sites, or to other areas that would not be impacted by the project. FDOT also was not given mitigation credits for: (1) the wildlife crossings and the fencing that will funnel wildlife through these crossings; (2) installation of pipe culverts north of the C-111 canal and bridges and box culverts south of C-111; and which, in addition to providing a corridor for aquatic species, will increase the tidal flushing of the area; (3) the removal of the Lake Surprise Causeway, which will restore historical hydrological flow between the eastern and western sides of Lake Surprise; (4) FDOT's commitment to improve and maintain the flushing of the west lagoon culverts in Boca Chica (mitigation is in the east lagoon); and (5) FDOT's contribution of $300,000 to assist Monroe County in performing a carrying capacity study for the County. Additionally, FDOT will preserve the Jewfish Creek Bridge abutment, which will be preserved for local historical purposes. FDOT will prepare the Jewfish Creek Bridge pilings for an artificial reef at Long Key during construction. THE PUBLIC INTEREST TEST It is appropriate for the SWFMD to consider, in balancing the public interest test, to consider traffic safety and hurricane evacuation.3 Because of FDOT's expertise in those areas, it is appropriate for the permitting agency to give great weight to highway safety concerns, including hurricane evacuation, presented by FDOT. The application of the public interest test does not involve consideration of non-environmental factors other than those expressly set forth in the statutes such as navigation or preservation of historical or archaeological resources. Specifically, aesthetics, quality of life, the potential for a project to cause increased crime, and school overcrowding are not properly considered within any of the seven factors contained in Section 403.918(2)(a), Florida Statutes (1991). The District concluded that the project is clearly in the public interest based upon consideration and balancing of the following factors: hurricane evacuation improvements, public safety improvements, a SWM system where no SWM system currently exists; wildlife crossings and fencing north of the C-111 canal where no such crossings or fencing currently exist; wildlife box culverts to accommodate crocodiles, alligators, manatees and marine life where no such culverts currently exist; and hydrologic culverts, which have the potential to assist in the restoration of hydrologic flows, and the mitigation projects, both upfront and concurrent. SECTION 403.918(2)(a), FLORIDA STATUTES Section 403.918(2)(a), Florida Statutes, requires the permitting agency to determine “[w]hether the project will adversely affect the public health, safety, or welfare or the property of others." The property of others is not at issue. As discussed below, the evidence clearly established that the project will greatly enhance the safety of the road during normal operations and facilitate evacuation in the event of a hurricane. There will be clear benefits to the public safety as a result of this project. As part of the PD&E process, FDOT, through Metric, prepared "A Safety Evaluation" of the existing roadway. The safety analysis was based on FDOT accident statistics for the years 1983-1988, as well as engineering review of the conditions causing the accidents. Specifically, FDOT based their safety analysis on the following: 1) calculation of the abnormally high accident rate on the roadway based on the rate quality control formula set forth in the FDOT Highway Safety Improvement Guidelines, and approved by the Federal Highway Administration; 2) copies of the actual crash reports filed with the Florida Division of Highway Safety and Motor Vehicles, which provided detail greater than that generally available through FDOT's own accident data reports, and which formed the basis of the collision diagram in the Safety Evaluation (FDOT Exhibits 36; and 3) and its August 1996 update thereto (FDOT Exhibit 41), on-site evaluation and review of the roadway to determine geometrics of the roadway, locations of driveway accesses and side roadways and the degrees at which roadways intersected. Metric prepared an update of the Safety Evaluation for the years 1989-1994, to determine the continuing validity of the Safety Evaluation, as well as to review alternative proposals to the original proposed roadway configuration. In preparing the update, the recent accident data (FDOT Exhibit 37) and the underlying research in the Safety Evaluation were used by Metric Engineering in reaching its conclusions. The Safety Evaluation performed by Metric in 1989 established high accident rates on the roadway based on a detailed segmental analysis of the roadway. In August of 1996, the Safety Evaluation was updated by Metric, which update confirmed the findings of the Safety Evaluation, and further stated that accident frequency on the Monroe County portion of the roadway exceeded the state average accident rate and the abnormally high accident rate for the years 1990 through 1994 (notwithstanding the rear-end accidents occurring at Jewfish Creek). Fatal accidents on the Dade County portion exceed the state average on the same stretch by 37 percent for the same years. The most severe accidents occur on the Dade County portion. The Monroe County portion of the roadway exceeds the statewide average in the abnormally high accident rate four out of the last five years that FDOT studied. The Dade County portion does not exceed the accident frequency or the number of accidents, but the fatality rate in Dade County is much higher than the state average. Presently an abnormally high accident rate exists in three locations along the project corridor, two of which are in the vicinity of the Jewfish Creek bridge. The third location is north of the bridge on Cross Key. Replacing the Jewfish Creek Bridge with the fixed-height bridge proposed by FDOT will substantially increase the safety on the project corridor. The District considered this to be an important positive element in the public interest balancing test. The existing 2:1 slopes of the roadway make it difficult for drivers to recover from running off the roadway, resulting in a greater frequency of this type of accident. Moreover, the existing clear zone is not large enough to overcome the 2:1 slope to allow safe recovery of errant vehicles. As a result, catastrophic crashes occur rather than safe recoveries. Also, as with hurricane evacuation discussed in the following section, actual accidents on the roadway prevent traffic from accessing or leaving the Keys, and also prevent emergency vehicles from rapidly accessing the Keys and a crash site. This occurs because there is little or no shoulder or clear zone along the sides of the road to allow emergency vehicles to efficiently access an accident site, and in the event of a severe, head-on type collision, the roadway is blocked off. U.S. 1 through the project corridor is regarded as so unsafe for travel that Monroe County law enforcement officials call it "death alley." There are many head-on collisions due to the two-lane, no-median alignment. Law enforcement is difficult and dangerous along the roadway, because it has very few areas wide enough to allow law enforcement officials to detain driving violators. It is also very dangerous, for the same reasons, for a driver to pull off the roadway with a broken-down vehicle. High rates of speed and impaired drivers contribute to the accident rates along the project corridor. The efforts of law enforcement to control speeders and drunk drivers is impeded since it is practically impossible for enforcement officers to turn their vehicles around to pursue violators without running a high risk of causing an accident on their own. The project would significantly improve safety on the roadway by reversing the problems identified in the this section, as well as the previous sections of this Recommended Order. The project would virtually eliminate head-on collisions which largely contribute to serious injuries and fatalities along the roadway. The project would also help eliminate problems with emergency vehicle access to accident sites and restoration of service in the event of accidents, and would increase the roadway's level of service as discussed below. Improved level of service was an additional need considered by FDOT during the PD&E process. While the District did not consider the traffic level of service by itself to be weighted as part of the positive public interest criteria in this project, the impacts of resulting congestion are relevant to the public interest consideration of traffic safety as discussed in the foregoing sections. Lower quality level of service, as presently exists on the roadway through level of service F, adversely affects the safety of the roadway. When traffic levels rise, driver frustration increases leading to drivers passing in no-passing zones and potentially resulting in head-on collisions and high-severity accidents. Additionally, due to the narrow shoulders of the existing roadway, accident vehicles pose a threat to and impede normal traffic flow on the roadway. The Highway Capacity Manual set the standards for traffic engineering and is used in all fifty states. The manual classifies the existing roadway as a two-lane arterial rural road. Applying the standards for measuring level of service for two-lane rural roads set forth in the Highway Capacity Manual, FDOT determined that the existing level of service on the roadway is E, which is a very poor level of service that does not meet the established standard of level of service C required by the Highway Capacity Manual. Monroe County uses a speed based method of calculating level of service. Using that method, the level of service for U.S. 1 is at an acceptable level. The parties disagree as to which method of calculating the level of service is appropriate. That conflict is resolved by finding that the method used by FDOT is the appropriate method because of its wide acceptance and long-term use. Traffic volume in the area of the southern terminus of the project is growing at a rate average annual rate of 3.07 percent. In the present condition of the roadway, level of service will degrade to F, or forced-flow conditions, by the year 2006. Even with the improvements proposed by FDOT, the level of service in the northbound direction would improve to level of service B, but the level of service in the southbound direction would remain at level of service D or E due to the single southbound land configuration. Hurricanes pose a serious threat to the safety and welfare of residents and visitors of the Keys. Monroe County is the most vulnerable hurricane-prone area in the United States because it is surrounded by tropical waters, land elevation is low throughout the islands, and the evacuation routes are limited to U.S. 1, an extended route that starts in Key West and runs to the mainland, and Card Sound Road. The greatest potential for loss of life during a hurricane in the Keys is from storm surge. Storm surge is a dome of water near the center of a hurricane which is created by the winds on the water's surface. In a category 3, 4 or 5 storm, the entire land mass in the path of the storm will be inundated. Because of the wind and storm surge associated with hurricanes, the best response to a hurricane warning in the Keys is to evacuate people to the mainland away from the water and the storm surge threat. Accordingly, Monroe County orders a mandatory evacuation in a category 3, 4, or 5 hurricane, and no shelters are opened. There is little or no disagreement as to the vulnerability of the Keys to hurricanes or as to the danger posed by a hurricane. There is disagreement as to whether the proposed project is needed for improved hurricane evacuation. The conflicting evidence in this regard is resolved by the following findings, which are based on the more credible, substantial evidence. The existing road does not have sufficient hurricane evacuation capacity to meet the present and projected future needs of Monroe County residents and visitors. In current hurricane evacuations, the two northbound lanes on U.S. 1 between mile marker 90 and 106 are split at Key Largo. Sixty percent of the traffic is directed up the northbound lane of U.S. 1; forty percent of the traffic is diverted onto the northbound lane of Card Sound Road. One southbound lane of U.S. 1 and Card Sound Road must remain open for emergency vehicles to reach an accident or a disabled vehicle, or to bring emergency supplies into the Keys. Improving the roadway is critical to the success of Monroe County's hurricane evacuation plan. FDOT relied on hurricane evacuation and needs modeling performed by Monroe County and the ACOE to confirm the need for improvements. All of the models used indicated that the project corridor is the controlling roadway segment for improving hurricane evacuation of the Keys. Additionally, FDOT relied on the Lewis Report of January 15, 1993, a study commissioned by the Governor of Florida. Recommendation No. 17 of the Lewis report recommends that FDOT expedite the design and construction of the project, which is viewed as being critical for increasing the rate of emergency evacuation. Dr. Robert Sheets, former director of the National Hurricane Center, testified that the failure to make improvements to the roadway would be "unconscionable." Dr. Sheets and Billy Wagner, the Director of Emergency Management for Monroe County, presented very compelling and very persuasive testimony that this project is essential for hurricane evacuation purposes. The proposed project is the minimum transportation improvement that will achieve a significant improvement in evacuation safety and clearance time. With the present two- lane configuration and narrow shoulders, evacuating traffic would be halted completely by a vehicle breakdown or an accident blocking one lane. Replacement of the Jewfish Creek Bridge will also facilitate the hurricane evacuation need for the project. In addition to improving the rate of evacuation, the project will make an evacuation safer. Emergency personnel cannot reach accidents on the roadway during an evacuation because, in certain segments, no roadbed exists adjacent to the northbound lane. A second northbound lane and wider road shoulders would enable disabled vehicles to be serviced and removed from the highway. The proposed changes to the road would improve emergency vehicles' access to an accident scene. The elevation of the roadway at Lake Surprise is so low that it can be flooded easily by a storm. The proposed project would replace the existing muck bed of the roadway with more stable material. The existing roadway is subject to settling and washout during storm events, which reduce the safety of the roadway itself and reduce the evacuation capacity of the roadway. If washout occurs, moving equipment to the islands for recovery efforts following a hurricane will be difficult or impossible. The proposed project will prevent erosion and reduce the effects of storm surge and wave action on the road during a hurricane. When the project has been completed, three lanes of evacuating traffic, two lanes from U. S. 1 and a third from Card Sound Road, will converge at Florida City. Representatives of FDOT, the Monroe County Sheriff's Department, the Florida Department of Law Enforcement and Monroe County Emergency Management have planned to manage the northbound traffic when it reaches Florida City during an evacuation. Several feasible alternatives exist, but additional planning is needed to prevent a monumental bottleneck at the northern terminus of the project. While it is clear that this project will not resolve all problems that exist as to hurricane evacuation, it is also clear that this project is essential to improve hurricane evacuation. SECTION 403.918(2)(a)2, FLORIDA STATUTES Section 403.918(2)(a)2, Florida Statutes, requires the permitting agency to consider “[w]hether the project will adversely affect the conservation of fish and wildlife, including endangered species, or their habitats.” The District considered the effect of the direct loss of dredging and filling 149.07 acres of wetland. As set forth in previous sections, it is found that this loss will be offset by the mitigation. For use during construction of the project, FDOT will adhere to technical special provisions and special permit conditions 9 through 13 to protect manatees, crocodiles, alligators, indigo snakes, marine turtles, and valuable trees, palms and other wildlife, to minimize or preclude any impacts to those species. Additionally, any osprey nests around the Jewfish Creek Bridge area at the time of construction will be relocated by FDOT if necessary. As part of the development of the FEIS, as required by the Federal Highway Administration under the National Environmental Protection Act, FDOT obtained official letters of concurrence from the USFWS and NMFS that the project would cause no adverse impacts to endangered species under section 7 of the Endangered Species Act. That process also established the project's consistency with Florida Coastal Zone Management Program, as determined by the State Clearinghouse within the Office of the Governor, in coordination with DEP, the Department of National Resources and FGFWFC. The project also contains provisions to impact positively or enhance the conservation of fish and wildlife, including threatened or endangered species and their habitat, as described below. These were positive factors that further helped neutralize and offset the 149.07 acres of direct impacts. In addition, FDOT is required to evaluate the effectiveness of the fencing along the entire project corridor, discussed below, and report to the District on that effectiveness. If the District determines that the fencing could be more effective, it may require FDOT to implement those suggestions. South of the C-111 canal, construction of box culverts and bridges addresses impacts to the American crocodile, a listed endangered species. Problems were identified with placement of existing culverts, which did not provide enough clear space and which caused the crocodile to cross over the roadway rather than through the culvert. To address this problem, 15 larger box culverts and three bridges will be placed within the roadway. These provide the necessary clear space to allow the crocodile to safely pass under rather than over the road. The location of the box culverts was chosen by reviewing crocodile mortalities associated with road crossings. Placement of these box culverts and bridges will also improve the hydrological flow of water within the project area, provide a crossing area for manatees, and allow greater dispersal of the crocodile population throughout Florida Bay. Species expected to use these box culverts include aquatic and aquatic water dependent species in the area. They were primarily targeted for crocodiles, alligators, and manatees, but certain fishes, turtles, frogs and other species in the wetlands along the project corridor will utilize the culverts. The box culverts will have 100 feet of wingback fencing extending north and south of each culvert. The intent of the wingback fencing is to funnel wildlife into the box culverts. Intermittent or wingback fencing is appropriate south of the C-111 canal for two primary reasons. First, the animals which will be guided into the box culverts are aquatic dependent. The area south of the C-111 canal is primarily water, washed mangrove areas and tidal creeks. Crocodiles tend to move in tidal creeks. Second, it was not possible to ensure continuous fencing along all portions of the project south of the C-111 canal because there are existing businesses. It could not be assured that these businesses would keep a gate closed. The project originally proposed continuous fencing alongside the road where it abuts ENP. Continuous fencing was initially proposed because the initial application included a solid concrete barrier down the median of the road. If a crocodile did enter the road from the side with discontinuous fencing, after crossing one lane the crocodile would hit the barrier, but then easily find its way back to the area it came from. However, the project was later modified to include a tri-beam barrier because it lessens the footprint of the project and thereby lessens the wetland impact. Since the current application does not include a continuous barrier down the middle of the road, if a crocodile enters the road it would cross the tri-beam barrier, go across another lane of roadway before hitting a continuous fence. The animal would then run up and down that fence with nowhere to go except back across the road again. This would increase their exposure to a road kill. With the installation of bridges and culverts along the southern portions of the project corridor, there is no need for continuous fencing because aquatic wildlife, such as the American crocodile, will tend to follow the flow of water through the culverts rather than climb over the roadway. The FGFWFC and ENP oppose continuous fencing and prefer intermittent fencing south of C-111 canal since the project now includes a tri-beam barrier. Positive benefits also include construction of panther crossings at four locations north of the C-111 canal to account for impacts to the Florida panther, a listed endangered species, in the vicinity of the project, along with continuous fencing on both sides of the road north of the C- 111 canal. The crossings will be placed at locations that show historical use by wildlife, including areas at the Dade County Correctional Institute access roadway, the water control structure on the C-109 canal, and the berm of the C- 111 canal. The wildlife crossings are indicated by blue dots on FDOT's Exhibit 1. FDOT underwent years of extensive coordination with the environmental regulatory and resource agencies to design a project that would accommodate their ecosystem management plans. The location of the wildlife crossings was based upon radio telemetry data, collected from radio-collared panthers, and their typical corridor movement. The location was further chosen based on input from the USFWS and the FGFWFC. The continuous fencing north of the C-111 canal will prevent wildlife from crossing the road, and instead force them to use the wildlife crossings. The crossings were designed for panther use, the panthers being the shyest animal in the area. If panthers can be accommodated, then other threatened and endangered species and other wildlife are expected to use them. DOT studies of the effectiveness of wildlife crossings, with fencing, including crossings installed on Alligator Alley, establish that wildlife will use the crossings, both singly and in groups, and that the crossings substantially reduce, if not eliminate, automobile- related mortality of wildlife. Documented wildlife include panthers, wild turkeys, wading birds, alligators, deer, bobcats, black bears and raccoons. SECTION 403.918(2)(a)3, FLORIDA STATUES Section 403.918(2)(a)3, Florida Statutes, requires the permitting agency to consider “[w]hether the project will adversely affect navigation or the flow of water or cause harmful erosion or shoaling.” The replacement of the bascule bridge at Jewfish Creek with a 65-foot high fixed-height bridge will be a benefit to navigation. Because Jewfish Creek is part of the intracoastal waterway, the existing bridge has to be frequently raised or lowered to accommodate marine traffic. Because of the age of the existing structure, frequent breakdowns have been experienced. Marine traffic is stopped or delayed if the bridge cannot be raised or if there is a delay in raising the bridge. Vehicular traffic is stopped while the bridge is raised. Regarding the flow of water, the project incorporates wildlife box culverts and bridges, which will improve tidal flushing and the flow of water south of the C- 111 canal. The District considered this to be a positive consideration under the public interest test. The 25 hydrologic culverts north of the C-111 canal were also a positive factor in the test because the culverts provide future water management capability. Erosion and shoaling are neutral factors in the public interest test because the permit conditions contain a plan to control erosion and shoaling during construction and to provide for road stabilization after construction. In addition, there is a positive factor regarding shoaling in that the roadway area now has a lot of storm action, causing problems with erosion on the side of the road. The project provides for road stabilization, which is a neutral to positive factor in the public interest test. SECTION 403.918(2)(a)4, FLORIDA STATUTES Section 403.918(2)(a)4, Florida Statutes, requires the permitting agency to consider “[w]hether the project will adversely affect the fishing or recreational values or marine productivity of the project.” A positive factor pertaining to marine productivity is the box culverts and bridges south of C-111, which will allow marine species to travel beneath the road to access the water on both sides of the road. Removal of the causeway along Lake Surprise opens that water body back up to one contiguous system, which is also a positive factor. The seagrass mitigation addressed in previous sections will also improve marine productivity and provide habitat for fish. SECTION 403.918(2)(a)5, FLORIDA STATUTES Section 403.918(2)(a)5, Florida Statutes, requires the permitting agency to consider “[w]hether the project will be of a temporary or permanent nature.” The project is permanent, though some construction impacts are temporary in nature. Once temporary impacts have ended and the project is complete, the project will be a positive benefit, because of the construction of the SWM system, culverts, animal underpasses and other benefits as set forth above. SECTION 403.918(2)(a)6, FLORIDA STATUTES Section 403.918(2)(a)6, Florida Statutes, requires the permitting agency to consider “[w]hether the project will adversely affect or will enhance significant historical and archaeological resources under the provisions of s. 267.061.” This factor is not at issue. SECTION 403.918(2)(a)7, FLORIDA STATUTES Section 403.918(2)(a)7, Florida Statutes, requires the permitting agency to consider “[t]he current condition and relative value of functions being performed by areas affected by the proposed activity.” A percentage of wetlands immediately adjacent to the road are impacted by exotic vegetation. Areas further out are part of a significant wetland ecosystem and are considered high quality. This project contains an exotic control program within FDOT's right of way, which is a positive consideration in the public interest test. Wetlands are currently receiving untreated storm water, which runs off the road immediately into the adjacent wetlands and water bodies without treatment. The project will include a SWM system where none currently exists as is detailed in the previous sections. This is a positive factor in the public interest test. The direct impacts of the project on 149 acres of wetlands alongside the roadway is not as large or significant as the impact caused by placement of the original embankment and resulting cut off of the eastern and western portions of the Everglades north of the C-111 canal. Overall, the concurrent and upfront mitigation efforts of FDOT are of regional significance and benefit to Everglades ecosystem by helping to repair the damage caused by the original embankment. THE PROJECT IS CLEARLY IN THE PUBLIC INTEREST The District appropriately weighed all considerations in determining that the project is clearly in the public interest. The greater weight of the competent, credible evidence established that the project is clearly in the public interest. RIGHT OF WAY PERMIT APPLICATION The land encompassed by the ROW permit has been properly adopted as a "work" of the District, requiring District authorization via a ROW Permit Modification to FDOT. The District's real property interest in the C-111 ROW applicable to the ROW permit modification consists of both fee simple and easement interests. The evidence is clear that DOT's application for the permit modification was thoroughly reviewed by the District, consistent with the District's established ROW permit review process. The District presented uncontroverted evidence and expert testimony to establish by a preponderance of the evidence that issuance of the permit modification to FDOT is consistent with all applicable District statutes, rules and other criteria, including the District's conditions for issuance of ROW Permits set forth in Rule 40E-6.301, F.A.C. FBII offered no evidence or testimony to the contrary. FUTURE MODIFICATIONS Modifying the project at a later date to pave a second southbound lane would require a District ERP permit. The addition of impervious surface triggers the District's SWM jurisdiction in this regard. However, FDOT established that that it had no current plans for further widening. The permit conditions require secondary and cumulative impacts associated with the increased capacity be addressed in accordance with the rules and criteria in effect at the time of any application for future widening. In addition, the permits require that FDOT must comply with any more stringent water quality criteria in effect at the time of any future widening. MODIFICATIONS AT THE FINAL HEARING At the Final Hearing, the District issued an Addendum to Staff Report for each of the SWM and WRM permits. The amendments made non-substantive changes to the District's staff reports regarding fencing along the roadway, performance of a study of fencing on the roadway by FDOT, water quality sampling along the roadway, assignment of mitigation credits, and other technical changes in wording for purposes of clarification. The changes set forth in the District's Exhibits 5 and 6 do not create impacts to the environment beyond those addressed elsewhere herein.
Recommendation Based on the foregoing findings of fact and conclusions of law it is RECOMMENDED that the Governing Board of the South Florida Water Management District enter a Final Order that issues the three permits challenged in this proceeding (SWM Permit No. 940606-10, WRM Permit No. 9460606-2-D, and ROW Permit No. 2584) subject to the conditions contained in the staff reports on the SWM permit application and the WRM permit application and subject to the additional permit conditions reflected by District Exhibits 5 and 6 and by the Findings of Fact pertaining to the permit for the relocation of the FKAA pipe. DONE AND ENTERED this 11th day of April, 1997, in Tallahassee, Leon County, Florida. ___________________________________ CLAUDE B. ARRINGTON Administrative Law Judge Division of Administrative Hearings Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (904) 488-9675 SUNCOM 278-9675 Fax Filing (904) 921-6847 Filed with the Clerk of the Division of Administrative this 11th day of April, 1997.
Findings Of Fact The Parties and the Property. The Respondent, HORNE, owns or has options to purchase approximately 24.35 acres of real property at the southwest corner of U.S. Highway 41 and State Road 50 Bypass in Brooksville, Florida. The Petitioner, the ASSOCIATES, owns approximately 67.5 acres of real property to the south and downstream from the HORNE property. The ASSOCIATES' property is presently undeveloped. The HORNE property contains an existing Publix shopping plaza, a mobile home sales office and vacant lands. The Publix plaza was previously permitted by the DISTRICT before it was constructed. The Surface Water Permit Application On August 7, 1992, HORNE submitted its application for surface water permit No. 400317.02. The application sought approval to construct a surface water management system for a proposed new K-Mart store on HORNE's property. On November 3, 1992, the DISTRICT issued notice of final agency action approving issuance of permit No. 400317.02 to HORNE. The day before the original final hearing in this matter scheduled for March 1993, new information from a study called the Peck Sink Watershed Study came to light which rendered the project as then designed unpermittable. This information resulted in the surface water management system being redesigned. On April 1, 1993, the DISTRICT notified all of the parties that the redesigned surface water management met District rule criteria. This resulted in issuance of what became known as the April 1 submittal. On May 12, 1993, in response to concerns raised by the ASSOCIATES at depositions on May 10, 1993, HORNE produced the May 12 submittal and provided it to all parties on that same date. The changes in design reflected on the May 12 submittal related to lowering the pond bottoms one foot below the orifices and changing the contour lines on the outside of Pond 5A. On May 13, 1993, further minor changes were made to the permit materials. Specifically, the changes were: reflecting on the engineering worksheets the lowering of the pond bottoms accomplished on the May 12 submittal, correction of the contour line on the outside of Pond 5A and showing the amount of additional fill into the 100-year floodplain caused by the addition of the contour line to the outside of Pond 5A. In reviewing HORNE's application, the District applied the standards and criteria set forth in Chapter 40D-4, Florida Administrative Code, and the Basis of Review for Surface Water Management Permit Applications. Compliance with DISTRICT Permitting Criteria Water Quantity The main two areas considered by the DISTRICT in assessing water quantity in a closed basin are: attenuating the peak rate of discharge for the 25 runoff for the 100 The peak rate of runoff for this project for the 25 (2) cubic feet per second (cfs) less in the post-developed condition than in the pre-developed condition, as shown on the April 1 submittal. No changes were made between the April 1 and May 12 or 13 submittals relating to the peak rate of discharge. The difference in the volume of runoff between the pre-developed and post-developed condition during the 100-year storm is being retained on site, as shown on the April 1 submittal. Therefore, DISTRICT rule criteria for the peak rate and volume of runoff were met on the April 1 submittal. Lowering the bottoms of the detention ponds on the May 12 and 13 submittals resulted in additional post 100 system, as redesigned to retain this additional 100-year volume, exceeds the DISTRICT's 100 Floodplain Encroachment Under the DISTRICT's floodplain encroachment standards, any fill within the 100 out an equivalent volume of fill elsewhere on the property. HORNE's application satisfies the DISTRICT's floodplain standards. HORNE is filling 1.59 acre feet of the floodplain and creating 1.75 acre feet of compensation. The floodplain compensation will be above the seasonal high water table, as required by Section 3.2.1.4 of the DISTRICT's Basis of Review. The original, existing seasonal high water table will be lowered as a result of the excavation so that the entire floodplain compensation area will be above the seasonal high water table. Water Quality A wet detention system as proposed by HORNE is an acceptable means under the DISTRICT's rules of treating runoff for water quality purposes. The bottoms of the ponds, as shown on the May 12 submittal, are all at least one foot below the orifice elevations, as required by the Basis of Review. Thus, the project met all relevant DISTRICT water quality requirements as of the May 12 submittal. Operation and Maintenance DISTRICT rules require that reasonable assurances be provided that the surface water management system can be effectively operated and maintained. HORNE will be the operation and maintenance entity for this surface water management system. The DISTRICT's main concerns at the time of permit review are that the design of the surface water management system not be an exotic design, that the design insure that littoral zones can be established, that the system orifice can be cleaned, that the overall system will be stable and that there is a viable operation and maintenance entity. HORNE's project can be effectively operated and maintained. Remaining District Rule Criteria As stipulated to by the parties that the project will not cause adverse impacts to wetlands and will not diminish the capability of a lake or other impoundment to fluctuate through the full range established for it in Chapter 40D Additionally, the proof establishes that the project will not cause adverse impacts on surface and groundwater levels and flows will not adversely affect the public health and safety; is consistent with the requirements of other public agencies; will not otherwise be harmful to the water resources within the District; will not interfere with the legal rights of others as defined in Rule 17 Objections Raised by the ASSOCIATES at the Hearing Pond Slopes and Operation and Maintenance Contrary to the assertion that the pond slopes will not be stable and cannot be effectively operated and maintained, the pond side slopes at this project are going to be constructed out of a heavy clay type of soil. Sodded side slopes of 1:1, as proposed for three of the ponds, can be stabilized and effectively operated and maintained. Although there is no DISTRICT requirement that sodded side slopes be mowed, so on these slopes could, if necessary, be cut. In the event the side slopes were to erode, easy repair is possible. All of the ponds except one side of one pond have areas at least 20 feet wide and slopes no steeper than 4:1 where maintenance can be performed. With regard to the pond that does not have this characteristic, equipment can enter and perform necessary maintenance. Water Quality Treatment Concerns that at least a portion of the bottoms of the ponds need to be below the seasonal high water table and that circulation of the ponds needs to be maximized in order to meet water quality treatment criteria are misplaced since there is no requirement that the pond bottoms be below the seasonal high water table in wet detention systems such as the one at issue in this case. Further, the entire bottoms of the ponds are littoral zone and meet DISTRICT rule requirements that 35 per cent of the pond be littoral zone, concentrated at the outfall. Additionally, the ponds at issue maximize circulation through the location of points of inflow and outflow. Floodplain Mitigation Concerns that volume in the floodplain mitigation area is not available because of problems with the seasonal high water table are also misplaced. Specifically, the floodplain area encroachment requiring mitigation relates to Pond 5A. There is more than enough volume within the area which will be excavated to compensate for the area where the fill will be deposited. The seasonal high water table will be at or below the floodplain mitigation area after the required excavation takes place. Although the seasonal high water table will be lowered where the excavation or cut is made and later raised where the fill is placed, no adverse effects on the water table will result from such lowering and raising of the water table. Volume In Pond 5A Allegations that the May 12 and 13 submittals reflect that Pond 5A has less volume available than the modeling calculations contemplate are incorrect. The changes in the contour lines of Pond 5A on the May 12 and 13 submittals from what was shown on the April 1 submittal occurred on the outside of the pond. The volume on the inside of the pond was not reduced actually increased when the pond bottom was lowered for water quality purposes. In determining how much volume a pond is to have when it is constructed, the computer modeling figures take precedence over the scaled plan drawings. In this case, the computer modeling figures never changed after the April 1 submittal. HORNE submitted a computer model that calculated the volume of Pond 5A. The output data clearly reflects that the top of the bank was 82 feet. Publix's Status as an Existing Site Assertions that the Publix site should have been considered in its pre-developed state since there will be approximately one acre foot of volume of runoff, or possibly less, leaving the site without retention are without validity. The Publix plaza was permitted by the DISTRICT in 1985 and constructed in 1986. The amount of peak flow discharge and overall discharge is currently authorized by a valid MSSW permit. When the DISTRICT reviews a permit application, all existing permitted surface water management systems must be accepted in their present state. There is no authority in the DISTRICT's rules to consider an existing permitted site in its pre Even if the Publix site is considered in its pre project has only .02 of an acre foot more volume of runoff in its post-developed condition than in the pre Storage of 100-Year Volume Allegations that the amount of 100-year volume being retained on site in the ponds has been incorrectly calculated by the DISTRICT and HORNE are also invalid. The DISTRICT's rules require that the difference between the pre- and post-development volume for the 100-year storm be retained on site. In the ponds which are the subject of this proceeding, the 100-year volume is retained in the ponds below the orifice. This volume cannot leave the site through the orifice; it can only leave the site by percolation into the ground or evaporation into the air.
Recommendation Based on the foregoing, it is recommended that the Southwest Florida Water Management District enter a final order granting HORNE's Application for Surface Water Management Permit No. 400317.02. RECOMMENDED this 25th day of June, 1993, in Tallahassee, Florida. DON W. DAVIS Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 25th day of June, 1993. APPENDIX The following constitutes my rulings, in accordance with Section 120.59, Florida Statutes, on proposed findings of fact submitted by the parties Proposed findings submitted by Petitioners (Petitioner's proposed findings begin at paragraph number 13.) 13.-19. Accepted. 20.-30. Rejected, unnecessary. 31.-44. Rejected, subordinate to hearing officer findings. 45.-47. Accepted. 48.-77. Rejected, subordinate to hearing officer findings. 78.-79. Rejected, recitation of documents. 80.-84. Rejected, weight of the evidence. 85.-88. Rejected, unnecessary. 89.-93. Rejected, weight of the evidence. 94.-95. Rejected, unnecessary. 96. Accepted. 97.-98. Rejected, subordinate, weight of the evidence. 99.-100. Rejected, unnecessary. 101.-126. Rejected, subordinate. 127. Accepted. 128.-129. Rejected, unnecessary. 130.-135. Rejected, argument. 136.-144. Rejected, weight of the evidence. Respondents Joint Proposed Findings. 1.-56. Accepted, though not verbatim. 58.-59. Rejected, unnecessary. COPIES FURNISHED: David Smolker, Esquire Honigman, Miller, Schwartz & Cohn 2700 Landmark Centre 401 East Jackson Street Tampa, Florida 33602 Rodney S. Fields, Jr., Esquire Blain & Cone, P.A. 202 Madison Street Tampa, Florida 33602 Richard Tschantz, Esquire Mark F. Lapp, Esquire Southwest Florida Water Management District 2379 Broad Street Brooksville, Florida 34609 Peter G. Hubbell Executive Director Southwest Florida Water Management District 2379 Broad Street Brooksville, FL 34609-6899
The Issue Petitioners challenge the South Florida Water Management District’s (the District) proposed action to issue Individual Environmental Resource Permit (ERP) 50-06558-P to authorize conceptual approval of a surface water management (SWM) system to serve 1,919 acres of a phased, multiple-use development referred to as the Palm Beach County Biotechnolgy Research Park (BRP) and to authorize construction and operation of Phase 1A of that proposed project. The ultimate issue is whether the Applicants provided reasonable assurances that the proposed activities will not be harmful to the water resources of the District; will not be inconsistent with the overall objectives of the District; and will comply with the water quantity, environmental, and water quality criteria of the District’s ERP regulations, which are set forth in Part IV of Chapter 373, Florida Statutes, Florida Administrative Code Chapter 40E-4, et. seq.; and the Basis of Review for Environmental Resource Permit Applications Within the South Florida Water Management District – September 2003 (BOR).1
Findings Of Fact THE PARTIES The Florida Wildlife Federation, Audubon Society of the Everglades, and Jupiter Farms Environmental Council, Inc. (d/b/a Loxahatchee River Coalition) are not-for-profit corporations in existence prior to 2003 with more than 25 members in Palm Beach County. Palm Beach County Environmental Coalition was formed in 1997 and is a private, county-wide, non-profit citizen’s organization. Ms. Ketter, Mr. Bell, Ms. Larson, and Mr. Christensen are individuals affected by the proposed BRP. The Respondents stipulated that the parties who remained Petitioners after Mr. Silver’s withdrawal as a Petitioner have standing to bring this proceeding. The District, a public corporation existing by virtue of Chapter 25270, Laws of Florida, 1949, operates pursuant to Chapter 373, Florida Statutes, and Title 40E, Florida Administrative Code, as a multipurpose water management district with its principal office in West Palm Beach, Florida. The County is a duly-constituted governmental entity. THE PROJECT SITE AND ADJACENT LANDS The site of the project is generally referred to as the Mecca Farms, which is a contiguous tract of 1,919 acres of land. At present, the Mecca Farms is used for farming and mining operations. There presently exists a permitted, SWM system on the Mecca Farms that was first permitted in 1979, and has been modified from time to time since then. The existing SWM system includes 73 acres of ditches and a 272-acre above-ground impoundment area. The Mecca Farms site is located within the C-18 Basin. There are no jurisdictional wetlands or delineated surface waters on the Mecca Farms. The following, which is taken from the Staff Report (SFWMD Ex. 1), accurately describes the project site and its adjacent lands: The project site consists of 1,919 acres presently supporting an active orange grove with approximately 73 acres of associated drainage and irrigation ditches/canals and a 30-acre active sand mining operation. The ditches/canals are presently maintained at an elevation of approximately 17 feet NGVD.[3] These ditches/canals provide drainage conveyance to a 272-acre above- ground impoundment located in the northeast corner of the site utilizing four (4) 22,000 gpm pumps. The above-ground impoundment discharges to the west leg of the C-18 Canal via gravity discharge. Project site ditches and canals also connect directly to the C-18 Canal through an 18,000 gpm pump. An additional 224-acre agricultural area east of the 1,919 acres of orange groves is connected to and drains into the canal/ditch system on the project site. This adjacent area was leased from the adjacent land owner by the grove owner for use as row crops and was connected to the grove canal/ditch system for better control of drainage and irrigation. The area is no longer used for row crops. There is also a small area on the site that contains caretaker housing and an equipment maintenance building for the orange groves. These facilities were originally permitted in 1979 under Surface Water Management Permit No. 50-00689-S and subsequent modifications. The citrus grove and primary drainage facilities have been in existence since the 1960s. The Hungryland Slough is located north of the project site, separated from the project site by the C-18 Canal. This area is comprised primarily of publicly-owned natural areas, including an area referred to as Unit 11, which is owned in the majority by Palm Beach County. To the west is the J.W. Corbett Wildlife Management Area (CWMA) owned and managed by the Florida Fish and Wildlife Conservation Commission (FFWCC). To the east, a large area of low-intensity agricultural land exists under the ownership of Charles Vavrus and within the City of Palm Beach Gardens. These lands contain extensive wetlands that are adjacent to the Loxahatchee Slough to the east. The Acreage, a low-density residential area, is located directly to the south of the project site. The only access to the site at this time is an unpaved extension of Seminole Pratt-Whitney Road (SPW), connecting the site at its southwestern corner to the Acreage. THE PROPOSED PROJECT The subject application is for conceptual approval of the SWM system for the BRP and for construction and operation of Phase 1A of the project. All of the proposed Phase 1A construction will occur on the Mecca Farms site. The following, taken from the Staff Report, accurately describes the proposed project: The [BRP] is a phased multiple use development planned for approximately 1,919 acres and will consist of land uses related to science and technology, biotechnology, biomedical, and other related research and development industries and manufacturing. Additionally, proposed support and complementary land uses include educational, institutional, residential, commercial, and recreational facilities, along with utilities and a large created natural area. THE PROPOSED SWM SYSTEM The proposed SWM system will consist of several interconnected lakes that will provide wet detention for storm water runoff from the property site and from 39 acres of off- site flows from SPW Road and a proposed Florida Power and Light (FPL) Substation. The lakes will collect, store, and treat the runoff. The storm water will pass through the lakes, through a 247-acre area referred to as the “Natural Area” (which will be created as part of the mitigation plan), and discharged to the C-18 Canal. To provide additional water quality treatment, these lakes will include planted littoral zones and the southern lake will include a filter marsh. The Natural Area will, in subsequent construction phases, be constructed on the western boundary of the Mecca site with discharge to the C-18 canal, which is adjacent to the northern boundary of the Mecca Farms. The southern boundary of the Natural Area will be the north boundary of the lake that is to be constructed on the southern end of the property. This is the area that is available for use as a flow-way (which will be discussed in greater detail in a subsequent section of this Recommended Order). The Natural Area will be a wetland type system that will move water slowly through that system providing additional storage and water quality benefits prior to discharging through a gravity control structure into the C-18 Canal. The C-18 Canal discharges to either the Northwest or Southwest Fork of the Loxahatchee River, depending on how structures are operated downstream. Discharges travel in the C-18 Canal for approximately nine miles before reaching the Loxahatchee River. The existing SWM system for the Mecca Farms currently discharges to the C-18 Canal, as will the proposed SWM system. The proposed project will not discharge to the CWMA or the Hungryland Slough. The Grassy Waters Preserve and the Loxahatchee Slough are several miles from the project site and will not be affected by the project’s proposed activities. The following, which is taken from the Staff Report, accurately describes the proposed SWM system. The proposed conceptual surface water management system which will serve the 1,919-acre site will consist of site grading, storm water inlets and culverts which will direct all runoff to a series of interconnected lakes for water quality treatment and attenuation of the peak runoff rate. Pumps will control the runoff rate from the developed site into the adjacent onsite BRP natural area. The BRP natural area will discharge into the C-18 canal via a gravity control structure. The system has been designed to accommodate 39 acres of off-site flows from SPW [Road] and a proposed Florida Power and Light (FPL) Substation. The existing control elevation of the citrus grove is 17.0’ NGVD. The proposed control elevations are 18.0’ NGVD for the developed area and 19.0’ NGVD for the natural area. The control elevations are being raised to provide a “step down” of water elevations from wetlands to the north, west and east of the site (20.5’ to 21.0’) to lower elevations to the south (17.0’). PHASE 1A CONSTRUCTION The following, which is taken from the Staff Report, accurately describes the proposed Phase 1A construction: The Phase 1A construction activities will allow the applicant to proceed with lake excavation, clearing and site grading of 536 acres in the southern portion of the site. No permanent buildings or parking areas are proposed at this time. Stormwater from Phase 1A and the remainder of the site, to remain in agricultural use, will be treated in the Phase 1A lakes and then pumped into the existing impoundment for additional water quality treatment and attenuation prior to discharging to the west leg of the C-18 Canal via the existing weir structures. The existing 18,000 gpm pump that connects the on-site ditches and canals directly to the C-18 Canal will remain, but will only be used if the impoundment is full. (See Special Condition No. 21). Approval of Phase 1A authorizes the use of the existing, previously permitted surface water management facilities, therefore, the previous permit no. 50-00689-S is superceded by this permit. The 224 acre agricultural area east of the existing grove that is connected to the grove canal/ditch system will be severed as part of Phase 1A. The pipe connecting this area will be removed and portions of the berm around this area will be regraded so the area will sheetflow into the adjacent pasture land’s canal/ditch system as it did previously [sic] to being connected to the grove system. Of the 536 acres involved in the Phase 1A construction, 87 acres will become lake bottom and 449 acres will remain pervious area, subject only to grading. CONCEPTUAL APPROVAL Pertinent to this proceeding, Florida Administrative Code Rule 40E-4.021(5) defines the term “conceptual approval” to mean an ERP issued by the District which approves a conceptual master plan for a surface water management system or a mitigation bank. Florida Administrative Code Rule 40E-4.305, pertains to conceptual approvals and provides, in relevant part, as follows: Conceptual approvals constitute final District action and are binding to the extent that adequate data has been submitted for review by the applicant during the review process. A conceptual approval does not authorize construction, alteration, operation, maintenance, removal, or abandonment of a surface water management system or the establishment and operation of a mitigation bank. * * * For phased projects, the approval process must begin with an application for a conceptual approval which shall be the first permit issued for the project. An application for construction authorization of the first phase(s) may also be included as a part of the initial application. As the permittee desires to construct additional phases, new applications shall be processed as individual or standard general environmental resource permit applications pursuant to the conceptual approval. The conceptual approval, individual and standard general permits shall be modified in accordance with conditions contained in Chapters 40E-4 and 40E-40, F.A.C. Issuance of a conceptual approval permit pursuant to Chapter 40E-4, F.A.C., shall not relieve the applicant of any requirements for obtaining a permit to construct, alter, operate, maintain, remove, or abandon a surface water management system or establish or operate a mitigation bank, nor shall the conceptual approval permit applicant be relieved of the District’s informational requirements or the need to meet the standards of issuance of permits pursuant to Chapters 40E-4 or 40E-40, F.A.C. . . . PERMITTING CRITERIA In order to obtain an ERP, an applicant must satisfy the conditions for issuance set forth in Florida Administrative Code Rules 40E-4.301 and 40E-4.302. The conditions for issuance focus on water quantity criteria, environmental criteria, and water quality criteria. Florida Administrative Code Rule 40E-4.301 contains the following permitting conditions applicable to this proceeding: In order to obtain a standard general, individual, or conceptual approval permit ... an applicant must provide reasonable assurance that the construction, alteration, operation, maintenance, removal, or abandonment of a surface water management system: will not cause adverse water quantity impacts to receiving waters and adjacent lands; will not cause adverse flooding to on-site or off-site property; will not cause adverse impacts to existing surface water storage and conveyance capabilities; will not adversely impact the value of functions provided to fish and wildlife and listed species by wetlands and other surface waters; will not adversely affect the quality of receiving waters ...; will not cause adverse secondary impacts to the water resources; will not adversely impact the maintenance of surface or ground water levels or surface water flows ...; will not cause adverse impacts to a work of the District ...; will be capable, based on generally accepted engineering and scientific principles, of being performed and of functioning as proposed; will be conducted by an entity with the sufficient financial, legal and administrative capability to ensure that the activity will be undertaken in accordance with the terms and conditions of the permit, if issued; and will comply with any applicable special basin or geographic area criteria established in Chapter 40E-41 F.A.C. Florida Administrative Code Rule 40E-4.302 provides the following Additional Conditions for Issuance of Permits applicable to this proceeding: In addition to the conditions set forth in section 40E-4.301, F.A.C., in order to obtain a standard general, individual, or conceptual approval permit under this chapter or Chapter 40E-40, F.A.C., an applicant must provide reasonable assurance that the construction, alteration, operation, maintenance, removal, and abandonment of a system: Located in, on, or over wetlands or other surface waters will not be contrary to the public interest, or if such an activity significantly degrades or is within an Outstanding Florida Water, that the activity will be clearly in the public interest, as determined by balancing the following criteria as set forth in subsections 4.2.3 through 4.2.3.7 of the Basis of Review for Environmental Resource Permit Applications Within the South Florida Water Management District: Whether the activity will adversely affect the public health, safety or welfare or the property of others; Whether the activity will adversely affect the conservation of fish and wildlife, including endangered or threatened species, or their habitats; Whether the activity will adversely affect navigation or the flow of water or cause harmful erosion or shoaling; Whether the activity will adversely affect the fishing or recreational values or marine productivity in the vicinity of the activity; Whether the activity will be of a temporary or permanent nature; Whether the activity will adversely affect or will enhance significant historical and archaeological resources under the provisions of Section 267.061, F.S.; and The current condition and relative value of functions being performed by areas affected by the proposed activity. Will not cause unacceptable cumulative impacts upon wetlands and other surface waters as set forth in subsections 4.2.8 through 4.2.8.2 of the Basis of Review. . . . THE BASIS OF REVIEW The District has adopted the BOR and incorporated it by reference by Florida Administrative Code Rule 40E- 4.091(1)(a). The standards and criteria found in the BOR are used to determine whether an applicant has given reasonable assurances that the conditions for issuance of an ERP have been satisfied. Section 1.3 of the BOR provides, in part, as follows: . . . Compliance with the criteria established herein [the BOR] constitutes a presumption that the project proposal is in conformance with the conditions for issuance set forth in Rules 40E-4.301 and 40E-4.302, F.A.C. WATER QUANTITY The term “control elevation” describes the level of freshwater water bodies established by a SWM system. The existing SWM system has a control elevation of 17’ NGVD. The control elevation for the proposed lake system will be raised to 18’ NGVD, and the control elevation for the proposed Natural Area will be raised to 19’ NGVD. Raising the control elevations will permit more treatment of storm water prior to discharge and will permit a more controlled discharge. In addition, raising the control elevation will lessen seepage onto the project site from adjacent wetlands. The Applicants provided reasonable assurances that the proposed project will not cause adverse water quantity impacts to receiving waters and adjacent lands, thereby satisfying the criteria set forth in Florida Administrative Code Rule 40E- 4.301(a). The Applicants provided reasonable assurances that the proposed project will not cause adverse flooding to on-site or off-site property, thereby satisfying the criteria set forth in Florida Administrative Code Rule 40E-4.301(b). The Applicants provided reasonable assurances that the proposed project will not cause adverse impacts to existing surface water storage and conveyance capabilities, thereby satisfying the criteria set forth in Florida Administrative Code Rule 40E-4.301(c). VALUE OF FUNCTIONS OF WETLANDS AND SURFACE WATERS Florida Administrative Code Rule 40E-4.301(d), requires the Applicants to establish that “. . . the construction, alteration, operation, maintenance, removal, or abandonment of a surface water management system . . .” “. . . will not adversely impact the value of functions provided to fish and wildlife and listed species by wetlands and other surface waters.” The District established that the term “value of functions,” as used in the rule, refers to habitat and life support functions. Because there are no wetlands or delineated surface waters on the Mecca Farms site, there are no direct adverse impacts to the functions that wetlands provide to fish and wildlife. The Applicants have provided reasonable assurances to demonstrate that the value of functions provided to fish and wildlife and listed species by wetlands and other surface waters will not be adversely affected. The existing project site does not contain nesting areas for wetland-dependent endangered or threatened wildlife species or species of special concern. The potential for use of the existing project site for nesting by such species is minimal. The existing project site does contain habitat for the American Alligator and foraging habitat for wading birds and birds of prey. The primary foraging habitat on the existing site is around the perimeter of the existing 272-acre impoundment area in the northeast portion of the site. The existing impoundment will be replaced by on-site storm water treatment lakes and the BRP Natural Area that will have shallow banks planted with wetland plant species common to the area. Wildlife is opportunistic; and wading birds commonly feed in areas where there is water, wetland vegetation and wetland plants. The end result will be that the proposed project will have more and better foraging habitat acreage than the existing site. The Natural Area will provide a wetland buffer between the developed area and CWMA that will prevent any adverse impacts both to the wetlands and other surface waters in CWMA and to the value of the functions those wetlands and other surface waters provide to fish, wildlife, and listed species. The Natural Area will provide a wetland buffer between the developed area and Unit 11 that will prevent any adverse impacts both to the wetlands and other surface waters in Unit 11 and to the value of the functions those wetlands and other surface waters provide to fish, wildlife, and listed species. There was no competent evidence that the proposed project would impact the ability of the Florida Fish and Wildlife Conservation Commission to manage the CWMA through control burns or otherwise, thereby adversely affecting the diversity or abundance of fish and wildlife (including endangered species and their habitats). Petitioners attempted to raise the issue of mosquito control in their Petitions and at the Final Hearing. The allegations pertaining to mosquito control were struck by the District and Special Condition Number 26 was added before the Petitions were referred to DOAH. Petitioners made no attempt to amend their Petitions and have not challenged Special Condition 26. The Addendum to Staff Report (SFWMD Ex. 2) contains the following Special Condition Number 26: “Upon submittal of an application for construction of any buildings, the permittee shall submit a mosquito control plan for review and approval by District Staff.” Since there will be no buildings containing people or other facilities which would encourage the use of mosquito spraying, it is appropriate for the mosquito control condition to apply to only future phases of construction. There was no competent evidence of impacts attributable to pesticides associated with the application for the SWM system or for Phase 1A construction and operation that would adversely affect the diversity or abundance of fish and wildlife including endangered species and their habitats. The Applicants have satisfied the criteria set forth in Florida Administrative Code Rule 40E-4.301(d). WATER QUALITY The primary concern during Phase 1A construction will be erosion control. Best Management Practices (“BMPs”) are operational and design elements used to either eliminate or reduce the amount of pollutants at the source so they do not get into a SWM system or move downstream. To contain erosion in Phase 1A, the Applicants will use the following BMPs: Silt screens and turbidity barriers within existing ditches and around the perimeter of property. Planned construction sequencing to reduce movement and stock piling of material; Slope stabilization and seeding or sodding of graded areas; and Containment of construction materials with berms. All erosion and turbidity control measures will remain in place until the completion of the on-site construction and approval by the District’s post-permit compliance staff. The Applicants provided reasonable assurances that the proposed Phase 1A construction activities will not adversely impact the quality of receiving waters and that those activities will not violate State water quality standards. Section 5.2.1, BOR, requires that a SWM system provide wet detention for the first one inch of runoff. The proposed SWM system will provide wet detention for one and one-half inches of runoff. The Applicants provided reasonable assurances to demonstrate that the technical criteria in the BOR will be met. Under Section 1.3 of the BOR, compliance with the criteria in the BOR constitutes a presumption that the Proposed Project is in conformance with the conditions for issuance. This presumption was not rebutted by the Petitioners. The lake system will include planted littoral zones to provide additional uptake of pollutants. A filter marsh is also included in the southern lake. All of the storm water runoff from the lakes will pass through the filter marsh, which will be planted with wetland plants. The filter marsh will provide additional polishing of pollutants, uptake, and filtering through the plants. The discharge will then go into the BRP, which will provide the discharge additional uptake and filtering. BMPs utilized during the Operations and Maintenance phase will include regular maintenance inspections and cleaning of the SWM system, street-sweeping, litter control programs, roadway maintenance inspections and repair schedule, municipal waste collection, pollution prevention education programs, pesticides, herbicides and fertilizer storage, and application training and education. The littoral zones, filter marsh, BRP natural area, and BMPs were not included in the water quality calculations and are over and above rule requirements. The Applicants provided reasonable assurances to demonstrate that the proposed project will not adversely affect the quality of receiving waters. Therefore, Rule 40E- 4.301(1)(e), F.A.C., will be satisfied and water quality standards will not be violated. HAZARDOUS SUBSTANCES Pursuant to Section 5.5.5 of the BOR, commercial or industrial zoned projects shall provide at least one-half inch of dry detention or retention pretreatment as part of the required retention/detention, unless reasonable assurances can be offered that hazardous materials will not enter the project's SWM system. The Addendum to Staff Report reflects the following Special Condition 25 pertaining to hazardous materials: Upon submittal of an application for construction of commercial or industrial uses the permittee shall submit a plan that provides reasonable assurances that hazardous materials will not enter the surface water management system pursuant to the requirements of section 5.2.2(a) of the Basis of Review. Applicable permitting criteria does not require the Applicants to present a hazardous substances plan at this point because no facilities that will contain hazardous materials are part of the Phase 1A construction. SECONDARY IMPACTS Florida Administrative Code Rule 40E-4.301(1)(f) and Section 4.1.1(f) of the BOR, require an applicant to provide reasonable assurances that the proposed activities will not cause adverse secondary impacts to the water resources. A secondary impact is an indirect effect of a project resulting in adverse effects to wetlands or other surface waters. The District considers those adverse effects that would not occur "but for" the activities that are closely linked and causally related to the activity under review. This standard is discussed further in the Conclusions of Law section of this Recommended Order. The County’s Exhibit 3 is a secondary impact analysis identifying the secondary impacts that may potentially result from the proposed project. These impacts are: 1) the widening of SPW Road; 2) the construction of an FPL substation; 3) the extension of PGA Boulevard; and 4) the potential relocation of a runway at North County Airport. The secondary impact analysis performed pursuant to the Uniform Mitigation Assessment Method (UMAM) contained in Florida Administrative Code Chapter 62-345 reflects that up to 153.3 acres of wetlands may be partially or completely impacted by these secondary impacts, resulting in approximately 71.21 units of functional loss. Where future activities are expected to directly impact wetlands, secondary impacts were assessed based on the loss of all current functional value within the direct footprint of that activity. Additionally, an assessment was conducted to determine the degree of partial functional loss where impacts beyond the footprint of these activities are anticipated. SPW Road is an existing dirt road which is in the County's five-year road plan to widen as a four-lane paved road. Because the widening of the existing dirt road to a four-lane paved road is part of the five-year road plan, the impacts of that widening are not attributable to the subject project. However, as part of the proposed project, it is proposed to widen SPW Road to a six-lane paved road. The additional impacts associated with the widening from four to six lanes will be caused by, and are linked to, the proposed project. These impacts amount to approximately 2.2 acres. The FPL substation, which is proposed to service the proposed project, may result in 1.6 acres of potential direct impacts to wetlands. In addition, 1.0 acre of potential indirect secondary impacts may occur to wetlands that are not going to be dredged and filled. Those indirect secondary impacts may have some adverse impact on the functional value to those wetlands for wildlife utilization. The extension of PGA Boulevard to the Mecca Farms site has the potential to result in 45.6 acres of direct impacts to wetlands and 56.6 acres of indirect secondary wetland impacts which will not be dredged or filled, but will be in close proximity to the road. The secondary impact assessment for PGA Boulevard assumed the incorporation of wildlife crossings to minimize habitat fragmentation. If the airport runway needs to be shifted, potential direct wetland impacts to an additional 22.7 acres may occur. Indirect impacts to 23.6 acres of wetlands in close proximity could also occur. Runway relocation may or may not be necessary due to the PGA Boulevard extension; however, the analysis assumed the need for the relocation. Each of the projects listed above as potential secondary impacts will require a separate construction and operation permit from the District. The issuance of this permit does not in any way guarantee the issuance of permits for any of these identified potential secondary impacts. MITIGATION PLAN The Applicants provided a conceptual mitigation plan using UMAM to demonstrate how potential secondary impacts could be offset. Mitigation options have the potential to provide more than twice the functional gain than the functional loss from the identified secondary impacts. The conceptual mitigation options include: 194 acres of the land that had been acquired for future mitigation needs in Unit 11. 227 acres of the BRP natural area. 32.6 acres in the southern lake wetland along with proposed upland habitat. Sufficient mitigation is available in these options to offset the potential secondary impacts. The mitigation for the four potential secondary impacts is not required to be implemented now because the impacts are not occurring now. Section 4.2.7 of the BOR requires that the District consider those future impacts now and that a conceptual mitigation plan be provided to demonstrate and provide reasonable assurances that those impacts, in fact, can be offset in the future. The Governor and Cabinet sitting as the Board of Trustees considered and approved a request for public easement of approximately 30 acres to use a portion of CWMA for SPW Road, an FPL substation, and the land area that may be needed by District in the future for the connection to the flow-way. As consideration in exchange for the public easement over 30 acres, the County will transfer fee simple title of 60 acres to the State. This public easement also provides a benefit for CERP as it includes the small portion that the District is going to need for its future CERP project to connect to the flow-way on the proposed project site. The Applicants provided reasonable assurances that mitigation will offset secondary impacts to wetlands and other surface waters. UNIDENTIFIED SECONDARY IMPACTS Testimony at the final hearing raised a question as to whether there is nesting or roosting by listed wading bird species in adjacent off-site wetlands outside the eastern boundary of the project site. Evidence was inconclusive on nesting or roosting in these areas. Because the status of adjacent listed wading bird nesting or roosting is uncertain, the District suggested in its Proposed Recommended Order that a special condition requiring a wildlife survey prior to construction near the eastern project boundary be added to the permit as follows: Prior to application for construction within 1000 feet of the eastern boundary of the above-ground impoundment, the applicant shall conduct a wildlife survey to identify any nesting or roosting areas in the adjoining off-site wetlands utilized by listed species of wading birds. If such nesting or roosting areas are found the permittee shall, if determined necessary by the District, incorporate additional buffers or other appropriate measures to ensure protection of these wetland functions. The District represented in its Proposed Recommended Order that the County has no objection to adding the foregoing condition. CUMULATIVE IMPACTS Pursuant to Section 373.414(8), Florida Statutes, the District is required to consider cumulative impacts upon wetlands and other surface waters delineated in Section 373.421(1), Florida Statutes, within the same drainage basin. Cumulative impacts are the summation of unmitigated wetland impacts within a drainage basin. The cumulative impact analysis is geographically based upon the drainage basins described in Figure 4.2.8-1 of the BOR. Cumulative impacts are unacceptable when they would result in unacceptable adverse impacts to the functions of wetlands and surface waters within a drainage basin. There are no wetlands or other surface waters delineated pursuant to Section 373.421(1), Florida Statutes, on the Mecca Farms site. Therefore, no cumulative impacts are created by the direct impacts of the project. Cumulative impacts may be created by a project's secondary impacts. If a wetland impact has been appropriately mitigated on-site within the drainage basin, there is no residual impact, and therefore no cumulative impact. The PGA Boulevard extension, a portion of the SPW Road widening, and the airport runway relocation are located within the C-18 Basin. The proposed mitigation options are all located in the C-18 Basin and will offset those impacts. Those potential secondary impacts are considered to meet the cumulative impact requirements of Section 373.414(8), Florida Statutes. The Applicants provided reasonable assurances that the proposed project will not result in cumulative impacts to the C-18 Basin. The FPL substation is located within the L-8 Drainage Basin. The majority of the SPW Road expansion is located within the C-18 Basin, but a portion is located on the basin line between the C-18 Basin and the L-8 Basin. Because the mitigation for the L-8 impacts are proposed in a different basin, the Applicants were required to conduct a cumulative impact analysis for the L-8 Basin impacts. Based on the Florida Land Use Cover Classification System, there are 43,457 acres of freshwater wetlands within the L-8 Basin. Approximately 41,000 acres of the wetlands in L-8 Basin are in public ownership. This total constitutes approximately 95 percent of all the wetlands in the L-8 Basin. Public ownership of these wetlands provide a high level of assurance that these lands will be protected in perpetuity. The Respondents established that proposed mitigation can fully offset the potential impacts from the SPW Road expansion and the FPL substation and the approximately four acres of impacted wetlands in the L-8 Basin. The Applicants provided reasonable assurances that there are no unacceptable adverse cumulative impacts on the L-8 Basin.4 GROUND WATER FLOWS, SURFACE WATER FLOWS, AND MINIMUM FLOWS AND LEVELS Florida Administrative Code Rule 40E-4.301(1)(g) requires an applicant to provide reasonable assurances that the proposed activity will not adversely impact the maintenance of surface or ground water levels or surface water flows established pursuant to Section 373.042, Florida Statutes. The term "maintenance of surface and groundwater levels or surface water flows" in Florida Administrative Code Rule 40E-4.301(1)(g) means that a project will not adversely impact the maintenance of surface water flows that contribute to meeting the minimum flow for the water body. An adverse impact to the maintenance of surface or groundwater levels or surface water flows may occur when a project discharging to a water body with a designated minimum flow level is proposed to be diverted. An analysis was done to compare the peak discharge rate from the existing SWM system on the Mecca Farms site with the projected peak discharge rate from the proposed SWM system. The analysis showed that the peak discharge rate under the proposed system will be less than that of the existing system. That result was expected since the proposed system will have higher control elevations, which, as noted above, will provide better treatment and permit a better control of the discharge into the C-18 Canal. Under the existing SWM system, storm event water in a dry period is frequently stored in the existing impoundment for future irrigation purposes. Under the proposed SWM system such storm event water will be discharged downstream, which will benefit those downstream areas during dry periods. The proposed system will also provide better control over pulse discharges during heavy storm events. The Applicants provided reasonable assurances that the proposed activities will not adversely impact the maintenance of surface or ground levels or surface water flows as required by Florida Administrative Code Rule 40E-4.301(1)(g). THE DISTRICT’S OBJECTIVES Sections 373.414 and 373.416, Florida Statutes, require an applicant to provide reasonable assurances that a regulated activity will not be harmful to the water resources and will not be inconsistent with the overall objectives of the District. Congress initially authorized the Central and Southern Florida (“C&SF”) Project in 1948. Thereafter extensive work was undertaken pertaining to flood control; water supply for municipal, industrial, and agricultural uses; prevention of saltwater intrusion; and protection of fish and wildlife. The work included construction of a primary system of 1000 miles each of levees and canals, 150 water-control structures, and 16 major pump stations. Unintended consequences of the C&SF Project have included the irreversible loss of vast areas of wetlands, including half of the original Everglades; the alteration in the water storage, timing, and flow capacities of natural drainage systems; and the degradation of water quality and habitat due to over-drainage or extreme fluctuations in the timing and delivery of fresh water into the coastal wetlands and estuaries. In 1992, Congress authorized the C&SF Project Comprehensive Review Study, which is generally referred to as the “Restudy.” The objective of the Restudy was to reexamine the C&SF Project to determine the feasibility of modifying the project to restore the South Florida ecosystem and provide for the other water-related needs of the region, such as water supply and flood protection. In April 1999, the U.S. Army Corps of Engineers issued the Central and Southern Florida Project Comprehensive Review Study Final Integrated Feasibility Report and Programmatic Environmental Impact Statement (“Restudy Report”). The Restudy Report recommends a comprehensive plan for the restoration, protection, and preservation of the water resources of Central and South Florida. The resulting plan is known as CERP. The North Palm Beach County Part I project, which includes restoration of the Northwest Fork of the Loxahatchee River (“NWFLR”), is a component of CERP. The successful completion of CERP and the successful restoration of the NWFLR are high-priority objectives of the District. The Loxahatchee River is an important feature of the South Florida ecosystem, nationally and internationally unique, and an important natural and economic resource. Rules pertaining to MFL for the NWFLR and for the recovery of the NWFLR are found at Florida Administrative Code Rule 40E-8.011; 40E-8.221(4); and 40E-8.421. Recovery goals, which are not presently being met, have been established; and strategies to meet those goals have been identified. The Mecca Farms site is located within the boundaries of the CERP North Palm Beach County Part I project and has the potential to affect CERP and the restoration of the NWFLR. Projects that potentially would affect or would be within or adjacent to a CERP project are evaluated on a case-by- case basis to determine whether a proposed project would not be inconsistent with CERP and other District objectives. There was a dispute between Respondents and Petitioners as to whether the proposed project was inconsistent with the District’s objectives, including CERP and its goals pertaining to the restoration of the NWFLR. Petitioners contend that the District has insufficient evidence that the Mecca Farms will not be needed for the construction of a reservoir. That contention is rejected. The greater weight of the credible evidence established that sufficient storage is available at a superior site known as the Palm Beach Aggregates (PBA) site in the L-8 Basin, which is a unique geological site that will provide in-ground storage of water.5 Water from the PBA storage site can be conveyed to the NWFLR to increase dry season flows. Water can be stored at the PBA site in the wet season to prevent potentially damaging high flows. The L-8 Basin, which is adjacent to the C-18 Basin, receives more water during the wet season than it uses. This means that at present a significant amount of water must be discharged to tide (lost) during the wet season to provide for flood protection in this area. As envisioned, the water currently lost to tide could be stored at the PBA site for use during the dry season. By combining the water storage in the L-8 Basin with connective flow-ways to the C-18 Canal, water demands within the C-18 Basin, including the NWFLR, can also be met by the PBA storage site.6 An increase in freshwater flows to the NWFLR will further the District’s restoration goals for the NWFLR. Storage at PBA has regional benefits for other significant natural areas because it will provide additional flows to the Loxahatchee Slough and Grassy Waters Preserve. Those additional flows will further the District’s CERP goals. Since October of 2003, County staff and the District’s ERP staff have coordinated review of the subject project with the District’s CERP Planning and Federal Projects Division and other District staff working on projects in this region. The County asked the District to determine if the Mecca Farms’ site could in some way accommodate CERP objectives, and three alternatives were considered: 1) no action; 2) a reservoir; and 3) a flow-way. As opposed to a reservoir, the more valuable and the more practical, use of the Mecca Farms site would be as part of the system to convey the stored water to the areas that would most benefit from its discharge. The proposed flow-way in the BRP Natural Area would be an integral part of that conveyance system and would provide the District with greater flexibility in managing and directing the discharge of the water stored at the PBA site. Prior to the development of the flow-way concept as part of the proposed development, CERP identified a single route to take water from PBA to the NWFLR. The flow-way will provide an additional route from PBA to the NWFLR. That additional route will provide the District with greater operational flexibility. The flow-way will complement the L-8 Basin flow- way and help reduce peak flows to the NWFLR and the Estuary. The flow-way also provides a potential route allowing excess water to be brought back from the C-18 Basin to the PBA site for storage. There are no other potential routes that allow water to be directed from the C-18 Basin in the wet season to the PBA site. The flow-way provides a feature that was not part of the CERP original plan and is therefore an unanticipated benefit for CERP. The Applicants provided reasonable assurances that the proposed project is not inconsistent with the District’s objectives.7
Recommendation Based on the foregoing findings of fact and conclusions of Law, it is RECOMMENDED that the District issue the subject ERP for the conceptual approval of the SWM system for the BRP and the Phase 1A construction and operation subject to the general and special conditions set forth in the Staff Report and the Amended Staff Report. It is further RECOMMENDED that the District add the following special condition: Prior to application for construction within 1000 feet of the eastern boundary of the above-ground impoundment, the applicants shall conduct a wildlife survey to identify any nesting or roosting areas in the adjoining off-site wetlands utilized by listed species of wading birds. If such nesting or roosting areas are found the permittee shall, if determined necessary by the District, incorporate additional buffers or other appropriate measures to ensure protection of these wetland functions. DONE AND ENTERED this 3rd day of December, 2004, in Tallahassee, Leon County, Florida. S CLAUDE B. ARRINGTON Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 3rd day of December, 2004.