Findings Of Fact On May 24, 1994, Respondent, Jeff Dyson, applied for a dredge and fill permit from the Department to place an unspecified volume of fill within an historically-existing drainage ditch which carries water to the St. Johns River. The proposed project would direct the drainage currently flowing through the ditch into a 15-inch culvert, which would be installed on the property identified as Lot 3 of Riverwood Subdivision. Swales and structures associated with the culvert are to be constructed during the project and are considered a part of the proposal. See Department's Exhibit 1. The proposed project would place fill in waters of the State, thereby necessitating the Department's approval of the permit. The proposed project, as stated above, is located on Lot 3 of Riverwood Subdivision. The Petitioner owns Lot 4 of Riverwood Subdivision which is located to the east and downstream of the proposed project. The proposed project is located in Riverwood Subdivision which is already developed and single- family residences have been built on both of the lots adjacent to Lot 3. Respondent, Jeff Dyson, seeks the permit in order to develop Lot 3 and build a house on it. The drainage ditch which would be filled runs west to east across the center of Lot 3 and is between four and six feet wide. The depth of this 4itch increases as it moves west to east, reaching a depth of four feet at the eastern edge of the property, where it adjoins the Petitioner's lot. The proposed project would re-route the storm water runoff, which flows into the drainage ditch, around the single-family residence which Respondent, Jeff Dyson, proposes to build. The storm water runoff would be routed through a buried 15-inch culvert from the point of intersection of the existing ditch on the western boundary of the property to the point of discharge at the intersection of the existing ditch and the eastern boundary of the property. Filling of the drainage ditch previously was permitted by the Department in 1984 as part of the subdivision's development plan which authorized Robert A. Weyand to fill the ditch and construct along the southern boundary of the subdivision a swale which would redirect the then-existing drainage through the swale. The swale was constructed; however, the ditch was never filled. The swale carries the majority of the drainage entering the subdivision under Pine Street down the southern boundary of the subdivision to the St. John's River, Two 24-inch culverts under Riverwood Avenue remain from the drainage system which predates Mr. Weyand's permit. According to Mr. Potter, this old drainage system carries peak loads into the drainage ditch which Respondent, Jeff Dyson, proposes to fill at Lot 3. The 24-inch culverts were installed when the subdivision was developed in 1981; however, one of the culverts is completely blocked and the other is only partially open. Contrary to Mr. Potter's assertions about peak loads, the ditch collects water in light rains, and storm water pools on the southwesterly side of Riverwood Avenue and overflows Riverwood Avenue into the ditch flowing easterly in the direction of the proposed project. Riverwood Avenue, the only street in the subdivision, was designed to direct storm water along its curb and gutter system from west to east. This water adds to the flow over Riverwood Avenue at the point of the culvert where it joins with water running in the old drainage system and flows into the drainage ditch. The project, as designed by Mr. Potter, would not adversely effect the quantity of water east of the project. The project was designed so that there would no increase in the rate of runoff with the construction of the proposed residence. The project should not create any flooding downstream because there would be no alteration to the quantity or direction of the existing flows. Mr. Potter used the Department of Transportation (DOT) rainfall intensity duration frequency curves to determine the rainfall amount from the 1.88 acres on the western end of the subdivision upstream of the project. The DOT rainfall intensity duration frequency curves are widely accepted criteria for determining runoff for residential developments. In computing the amount of drainage flow which the 15- inch culvert would have to handle, Mr. Potter considered (1) the rainfall for a ten-year storm on the 1.88 acres at the westerly end of the subdivision, and (2) the flow under Pine Street through the existing culvert, which constitutes a limit to the potential flow into the drainage system at the southwest corner of the subdivision. The 15-inch culvert designed by Mr. Potter would handle two times the amount of water generated based upon the stated assumptions in a ten-year storm event. The proposed project would not increase these existing flows; however, the quantity of water exceeds the flow from the western portion of the subdivisions computed by Mr. Potter which follows the natural slope of the terrain into the old existing ditch system. The Petitioner introduced a video of the storm water collection and flow in a light rain at the location of the culvert under Riverwood Avenue. This video shows that the existing culverts under Riverwood Avenue will not handle the flow of water in the ditch southwest of Riverwood Avenue; therefore, the storm water backs up and flows over Riverwood Avenue at this point into the ditch east of Riverwood Avenue. Other than the ditch under Pine Street and the runoff from the 1.88 acres at the western end of the subdivision, the only other source of storm water runoff is the runoff on Riverwood Avenue. Mr. Potter observed the video and indicated that the amount of water appeared to exceed his computations. The Petitioner testified regarding the water levels in the ditch underneath his foot bridge over the ditch. During significant storm events, the water level reaches the bottom of the foot bridge. The area underneath the foot bridge exceeds the area of a 15-inch culvert. Water flow during a significant storm is unrestricted downstream of the foot bridge, and is not dammed up. The proposed project will constitute a dam on the existing drainage ditch with a 15-inch outfall. Based upon the video of the storm water runoff generated by a light rain, the Petitioner's observations of storm water runoff in the ditch during a significant storm event, and the design of the storm water runoff on Riverwood Avenue, it can be reasonably anticipated that the proposed project will dam up water to the west of the project to the highest level of the swale in front of the proposed project. Although the proposed project will not adversely effect the quantity of water, the water impounded by the project would cause a significant flooding problem for the upstream property owner. The design of the culvert does not provide for protection against children being pulled into the culvert system. The water impounded by the proposed culvert system would be an attraction to children who would be at risk of being pulled into the culvert. It is particularly dangerous because the ditch is much shallower southwest of Riverwood Avenue, and when flooded, the depth of the ditch northeast of Riverwood Avenue is not apparent. The water quality standards are currently being met at the site of the proposed project. The proposed project, as constructed, is not expected to cause any water quality violations. The permit contains conditions designed to maintain water quality during actual construction. These conditions include General Conditions No. 4 and 5 and Special Conditions 5- 10. Reasonable assurances were provided that water-quality standards will not be violated by the proposed project if built in accordance with the designs submitted. The design of the 15-inch culvert includes a 90 degree change of direction before connecting to the outfall on Lot 4. This 90-degree change in direction will dissipate the energy of the water, reducing the likelihood of scouring or erosion at the outfall point. Although the project is designed to eliminate scouring, the Department has included a condition in the permit, which requires Respondent, Jeff Dyson, to correct scouring, shoaling, or other alterations of the downstream portion of the drainage way. The flooding to the upstream property owner can be minimized by lowering the level of the swale in the front of the project to create an emergency spillway. The applicant has provided reasonable assurance that the water quality will not be adversely effected, and the proposal will not increase the volume of water. The project will not adversely effect the conservation of fish and wildlife, including endangered or threatened species or their habitats. The ditch does not contain any fish or wildlife. The subdivision in which the project is located is almost completely built out. Therefore, there are no endangered or threatened species living in the area. The project will not adversely effect navigation or the flow of waters and will not cause harmful erosion or shoaling. The project will not adversely effect fishing or recreational values or marine productivity. There are no fishing or marine recreational values associated with drainage ditches. The project will be permanent in nature. The project will not adversely effect significant historical or archeological resources. The current function of the ditch is to convey storm water to the St. John's River. This function will be effected as indicated above because the proposed project constitutes a dam with a 15-inch outfall. If the 15-inch culvert is incapable of carrying the storm waters introduced into the ditch west of the proposed project, the storm water impounded by the proposed project will flood the property west of the project to the level of the highest point of the swale in the front of the project. By redesigning this swale to have a maximum elevation of ten feet or less feet, the flooding will be retained within the approximate elevations of the existing ditch. In addition, steps can be taken to minimize the potential hazzard to children caught in the ditch. There are no cumulative impacts associated with this project. Except as noted above, the applicant provided reasonable assurances that the project is not contrary to the public interest, as defined by Section 373.414, Florida Statutes. The Department uses a balancing test, which consists of taking the public-interest criteria and weighing the pros and cons of a specific project. The ultimate question is whether the proposed project is contrary to the public interest. The Department believed that it was not contrary to the public interest. Based upon the evidence presented, the project has two adverse impacts, as indicated in Paragraphs 16 & 27. However, these can be eliminated or minimized to an acceptable level by the modifications recommended.
Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law set forth herein, it is, RECOMMENDED: That the Department approve issuance of the permit with the added conditions that the swale and driveway at the front of the proposed project not exceed an elevation of ten feet and that the culvert be constructed to protect children from being pulled into the intake. DONE and ENTERED this 21st day of November, 1996, in Tallahassee, Florida. STEPHEN F. DEAN Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (904) 488-9675 SUNCOM 278-9675 Fax Filing (904) 921-6847 Filed with the Clerk of the Division of Administrative Hearings this 21st day of November, 1996. COPIES FURNISHED: Jeff Dyson 395 Corporate Way Orange Park, Florida 32065 Michael S. McGurk 297 Riverwood Drive Orange Park, Florida 32073 Lynette Ciardulli, Esquire Department of Environmental Protection Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 Al Potter 905 North Street Jacksonville, Florida 32211 Virginia B. Wetherell, Secretary Department of Environmental Protection Douglas Building 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 Perry Odom, General Counsel Department of Environmental Protection Douglas Building 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000
The Issue This case involves a challenge to St. Johns River Water Management District’s (District or SJRWMD) intended issuance of an Environmental Resource Permit (ERP) granting the City's Application No. 4-127-97380-1, for the construction and operation of a surface water management system for a retrofit flood-relief project known as Drysdale Drive/Chapel Drive Drainage Improvements consisting of: excavation of the Drysdale Drive pond (Pond 1); improvement to the outfall at Sterling Lake; and the interconnection of Pond 1 and four existing drainage retention areas through a combination of pump stations and gravity outfalls (project or system). The issue is whether the applicant, the City of Deltona (City or Deltona), has provided reasonable assurance the system complies with the water quantity, environmental, and water quality criteria of the District’s ERP regulations set forth in Chapter 40C-4, Florida Administrative Code,1 and the Applicant’s Handbook: Management and Storage of Surface Waters (2005) (A.H.).2
Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the St. Johns River Water Management District enter a final order issuing to the City of Deltona an ERP granting the City's Application No. 4-127-97380-1, subject to the conditions set forth in the Technical Staff Report. DONE AND ENTERED this 17th day of March, 2006, in Tallahassee, Leon County, Florida. S J. LAWRENCE JOHNSTON Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 17th day of March, 2006.
The Issue The issue to be determined is whether the applicants, Far Niente Stables II, LLC; Polo Field One, LLC; Stadium North, LLC; and Stadium South, LLC, are entitled to issuance of a permit by the South Florida Water Management District (SFWMD or District) for the modification of a surface-water management system to serve the 24.1-acre World Dressage Complex in Wellington, Florida.
Findings Of Fact The Parties Petitioners Charles Jacobs and Kimberly Jacobs are the owners of a residence at 2730 Polo Island Drive, Unit A-104, Wellington, Florida. The residence is used by the Jacobs on an annual basis, generally between October and Easter, which corresponds to the equestrian show season in Florida. Petitioners maintain their permanent address in Massachusetts. The District is a public corporation, existing by virtue of chapter 25270, Laws of Florida 1949. The District is responsible for administering chapter 373, Florida Statutes, and title 40E, Florida Administrative Code, within its geographic boundaries. The District’s statutory duties include the regulation and management of water resources, including water quality and water supply, and the issuance of environmental resource permits. The Applicants, Far Niente Stables II, LLC; Polo Field One, LLC; Stadium North, LLC; and Stadium South, LLC, are Florida limited-liability companies with business operations in Wellington, Florida. The Applicants are the owners of four parcels of property, parts of which comprise the complete 24.1- acre proposed Complex, and upon which the surface-water management facilities that are the subject of the Permit are to be constructed. Contiguous holdings of the four Applicants in the area consist of approximately 35 additional acres, primarily to the north and west of the Complex. Acme Improvement District The Acme Improvement District was created in the 1950s as a special drainage district. At the time of its creation, the Acme Improvement District encompassed 18,200 acres of land. As a result of additions over the years, the Acme Improvement District currently consists of approximately 20,000 acres of land that constitutes the Village of Wellington, and includes the Complex property. On March 16, 1978, the District issued a Surface Water Management Permit, No. 50-00548-S, for the Acme Improvement District (1978 Acme Permit) that authorized the construction and operation of a surface-water management system, and established design guidelines for subsequent work as development occurred in the Acme Improvement District. The total area covered by the 1978 Acme Permit was divided into basins, with the dividing line being, generally, Pierson Road. Basin A was designed so that its interconnected canals and drainage features would discharge to the north into the C-51 Canal, while Basin B was designed so that its interconnected canals and drainage features would discharge to the south into the C-40 Borrow Canal. Water management activities taking place within the boundaries of the Acme Improvement District are done through modifications to the 1978 Acme Permit. Over the years, there have been literally hundreds of modifications to that permit. The Property The Complex property is in Basin A of the Acme Improvement District, as is the property owned by Petitioners. Prior to January 1978, the property that is proposed for the Complex consisted of farm fields. At some time between January, 1978 and December 18, 1979, a very narrow body of water was dredged from abandoned farm fields to create what has been referred to in the course of this proceeding as “Moose Lake.” During that same period, Polo Island was created, and property to the east and west of Polo Island was filled and graded to create polo fields. Polo Island is surrounded by Moose Lake. When it was created, Polo Island was filled to a higher elevation than the adjacent polo fields to give the residents a view of the polo matches. Petitioners’ residence has a finished floor elevation of 18.38 feet NGVD, which is more than three-quarters of a foot above the 100-year flood elevation of 17.5 feet NGVD established for Basin A. The Complex and Petitioner’s residence both front on Moose Lake. There are no physical barriers that separate that part of the Moose Lake fronting Petitioners’ residence from that part of Moose Lake into which the Complex’s surface-water management system is designed to discharge. Moose Lake discharges into canals that are part of the C-51 Basin drainage system. Discharges occur through an outfall at the south end of Moose Lake that directs water into the C-23 canal, and through an outfall at the east end of Moose Lake that directs water into the C-6 canal. There are no wetlands or surface water bodies located on the Complex property. 2005-2007 Basin Study and 2007 Acme Permit Material changes in the Acme Drainage District since 1978 affected the assumptions upon which the 1978 ACME Permit was issued. The material changes that occurred over the years formed the rationale for a series of detailed basin studies performed from 2005 through 2007. The basin studies, undertaken by the District and the Village of Wellington, analyzed and modeled the areas encompassed by the 1978 Acme Permit in light of existing improvements within the Acme Improvement District. The changes to Basin A and Basin B land uses identified by the basin studies became the new baseline conditions upon which the District and the Village of Wellington established criteria for developing and redeveloping property in the Wellington area, and resulted in the development of updated information and assumptions to be used in the ERP program. On November 15, 2007, as a result of the basin studies, the District accepted the new criteria and issued a modification of the standards established by the 1978 Acme Permit (2007 Acme Permit). For purposes relevant to this proceeding, the 2007 Acme Permit approved the implementation of the new Permit Criteria and Best Management Practices Manual for Works in the Village of Wellington.1/ The language of the 2007 Acme Permit is somewhat ambiguous, and portions could be read in isolation to apply only to land in Basin B of the Acme Improvement District. Mr. Waterhouse testified that the language of the permit tended to focus on Basin B because it contained significant tracts of undeveloped property, the land in Basin A having been essentially built-out. However, he stated that it was the District’s intent that the Permit Criteria and Best Management Practices Manual for Works in the Village of Wellington adopted by the 2007 Acme Permit was to apply to all development and redevelopment in the Acme Improvement District, and that the District had applied the permit in that manner since its issuance. Mr. Waterhouse’s testimony was credible, reflects the District’s intent and application of the permit, and is accepted. The Proposed Complex The Complex is proposed for construction on the two polo fields to the west of Polo Island, and properties immediately adjacent and contiguous thereto.2/ The Complex is designed to consist of a large covered arena; several open-air equestrian arenas; four 96-stall stables, with associated covered manure bins and covered horse washing facilities, located between the stables; an event tent; a raised concrete vendor deck for spectators, exhibitors, and vendors that encircles three or four of the rings; and various paved access roads, parking areas, and support structures. Of the 96 stalls per stable, twenty percent would reasonably be used for storing tack, feed, and similar items. The surface-water management system that is the subject of the application consists of inlets and catch basins, underground drainage structures, dry detention areas, swales for conveying overland flows, and exfiltration trenches for treatment of water prior to its discharge at three outfall points to Moose Lake. The horse-washing facilities are designed to tie into the Village of Wellington’s sanitary sewer system, by-passing the surface water management system. The Permit Application On May 18, 2011, two of the Applicants, Far Niente Stables II, LLC, and Polo Field One, LLC, applied for a modification to the 1978 Acme Improvement District permit to construct a surface-water management system to serve the proposed Complex. At the time of the initial application, the proposed Complex encompassed 20 acres. There were no permitted surface water management facilities within its boundaries. The Complex application included, along with structural elements, the implementation of Best Management Practices (BMPs) for handling manure, horse-wash water, and other equestrian waste on the property. Properties adjacent to the Complex, and under common ownership of one or more of the Applicants, have been routinely used for equestrian events, including temporary support activities for events on the Complex property. For example, properties to the north of the Complex owned by Far Niente Stables II, LLC, and Polo Field One, LLC, have been used for show-jumping events, derby events, and grand prix competitions, as well as parking and warm-up areas for derby events and for dressage events at the Complex. Except for an earthen mound associated with the derby and grand prix field north of the Complex, there has been no development on those adjacent properties, and no requirement for a stormwater management system to serve those properties. Thus, the adjacent properties are not encompassed by the Application. Permit Issuance On November 22, 2011, Permit No. 50-00548-S-203 was issued by the District to Far Niente Stables II, LLC. Polo Field One, LLC, though an applicant, was not identified as a permittee. On January 13, 2012, the District issued a “Correction to Permit No. 50-00548-S-203.” The only change to the Permit issued on November 22, 2011, was the addition of Polo Field One, LLC, as a permittee. On January 25, 2012, the Applicants submitted a request for a letter modification of the Permit to authorize construction of a 1,190-linear foot landscape berm along the eastern property boundary. On February 16, 2012, the District acknowledged the application for the berm modification, and requested additional information regarding an access road and cul-de-sac on the west side of the Complex that extended into property owned by others. On that same date, the Applicants provided additional information, including evidence of ownership, that added Stadium North, LLC and Stadium South, LLC, as permittees. On March 26, 2012, the District issued the proposed modification to Permit No. 50-00548-S-203. On November 15, 2012, the Applicants’ engineer prepared a revised set of plans that added 2.85 acres of property to the Complex. The property, referred to as Basin 5, provided an additional dry detention stormwater storage area. On or shortly after December 3, 2012, the Applicants submitted a final Addendum to Surface Water Management Calculations that accounted for the addition of Basin 5 and other changes to the Permit application that increased the size of the Complex from 20 acres to 24.1 acres. On December 18, 2012, the Applicants submitted final revisions to the BMPs in an Updated BMP Plan. On January 7, 2013, the District issued the final proposed modification to the permit. The modification consisted of the addition of Basin 5, the deletion of a provision of special condition 14 that conflicted with elements of the staff report, the Updated BMP Plan, the recognition of an enforcement proceeding for unauthorized construction of the linear berm and other unauthorized works, and changes to the Permit to conform with additional information submitted by the Applicants. The final permitted surface-water management system consists of inlets and catch basins, underground drainage structures, a 0.64-acre dry detention area, swales for conveying overland flows, and 959-linear feet of exfiltration trench. For purposes of this proceeding, the “Permit” that constitutes the proposed agency action consists of the initial November 22, 2011, Permit; the January 13, 2012, Correction; the March 26, 2012, letter modification; and the January 7, 2013 modification. Post-Permit Activities at the Complex Work began on the Complex on or about November 28, 2011. Work continued until stopped on April 18, 2012, pursuant to a District issued Consent Order and Cease and Desist. As of the date of the final hearing, the majority of the work had been completed. In late August, 2012, the Wellington area was affected by rains associated with Tropical Storm Isaac that exceeded the rainfall totals of a 100-year storm event. Water ponded in places in the Polo Island subdivision. That ponded water was the result of water falling directly on Polo Island, and may have been exacerbated by blockages of Polo Island drainage structures designed to discharge water from Polo Island to Moose Lake. No residences were flooded as a result of the Tropical Storm Isaac rain event. The only flooding issue related to water elevations in Moose Lake was water overflowing the entrance road, which is at a lower elevation. The road remained passable. Road flooding is generally contemplated in the design of stormwater management systems and does not suggest a failure of the applicable system. Permitting Standards Standards applicable to the Permit are contained in Florida Administrative Code Rule 40E-4.301(1)(a)-(k), and in the District’s Basis of Review for Environmental Resource Permit Applications (BOR), which has been adopted by reference in rule 40E-4.091(1)(a). The parties stipulated that the standards in rules 40E-4.301(1)(d),(g) and (h) are not at issue in this proceeding. Permitting Standards - Water Quantity Those provisions of rule 40E-4.301 that remain at issue in this proceeding, and that pertain to water quantity, are as follows: In order to obtain a standard general, individual, or conceptual approval permit under this chapter . . . an applicant must provide reasonable assurance that the construction, alteration, operation, maintenance, removal or abandonment of a surface water management system: Will not cause adverse water quantity impacts to receiving waters and adjacent lands; Will not cause adverse flooding to on- site or off-site property; Will not cause adverse impacts to existing surface water storage and conveyance capabilities. In addition to the preceding rules, section 6.6 of the BOR, entitled “Flood Plain Encroachment,” provides that “[n]o net encroachment into the floodplain, between the average wet season water table and that encompassed by the 100-year event, which will adversely affect the existing rights of others, will be allowed.” Section 6.7 of the BOR, entitled “Historic Basin Storage,” provides that “[p]rovision must be made to replace or otherwise mitigate the loss of historic basin storage provided by the project site.” The purpose of a pre-development versus post- development analysis is to ensure that, after development of a parcel of property, the property is capable of holding a volume of stormwater on-site that is the same or greater than that held in its pre-development condition. On-site storage includes surface storage and soil storage. Surface Storage Surface storage is calculated by determining the quantity of water stored on the surface of the site. Mr. Hall found no material errors in the Applicants’ calculations regarding surface storage. His concern was that the permitted surface storage, including the dry detention area added to the plans in December 2012, would not provide compensating water storage to account for the deficiencies he found in the soil storage calculations discussed herein. Based on the foregoing, the Applicants’ surface storage calculations are found to accurately assess the volume of stormwater that can be stored on the property without discharge to Moose Lake. Soil Storage Soil storage is water that is held between soil particles. Soil storage calculations take into consideration the soil type(s) and site-specific soil characteristics, including compaction. Soils on the Complex property consist of depressional soils. Such soils are less capable of storage than are sandier coastal soils. When compacted, the storage capacity of depressional soils is further reduced. The Applicants’ calculations indicated post- development storage on the Complex property to be 25.04 acre/feet. Mr. Hall’s post-development storage calculation of 25.03 acre/feet was substantively identical.3/ Thus, the evidence demonstrates the accuracy of Applicants’ post- development stormwater storage calculations. The Applicants’ calculations showed pre-development combined surface and soil storage capacity on the Property of 24.84 acre/feet. Mr. Hall calculated pre-development combined surface and soil storage, based upon presumed property conditions existing on March 16, 1978, of 35.12 acre/feet. Based on the foregoing, Mr. Hall concluded that the post-development storage capacity of the Complex had a deficit of 10.09 acre/feet of water as compared to the pre-development storage capacity of the Property, which he attributed to a deficiency in soil storage. The gist of Mr. Hall’s disagreement centered on the Applicants’ failure to consider the Complex’s pre-development condition as being farm fields, as they were at the time of issuance of the 1978 Acme Permit, and on the Applicants’ application of the 25-percent compaction rate for soils on the former polo fields. As applied to this case, the pre-development condition of the Complex as polo fields was a reasonable assumption for calculating soil storage, rather than the farm fields that existed in January 1978, and is consistent with the existing land uses identified in the 2005-2007 basin studies and 2007 Acme Permit. Given the use of the Complex property as polo fields, with the attendant filling, grading, rolling, mowing, horse traffic, parking, and other activities that occurred on the property over the years, the conclusion that the soils on the polo fields were compacted, and the application of the 25- percent compaction rate, was a reasonable assumption for calculating soil storage. Applying the Applicants’ assumptions regarding existing land uses for the Complex property, the greater weight of the evidence demonstrates that the proposed surface water management system will provide a total of 25.04-acre feet of combined soil and surface storage compared to pre-development soil and surface storage of 24.84-acre feet. Thus, the proposed Project will result in an increase of soil and surface storage over pre-development conditions, and will not cause or contribute to flooding or other issues related to water quantity.4/ Based on the foregoing, the Applicants have provided reasonable assurances that the proposed surface-water management system will meet standards regarding water quantity established in rule 40E-4.301(1)(a), (b), and (c), and sections 6.6 and 6.7 of the BOR. Permitting Standards - Water Quality Those provisions of rule 40E-4.301 that remain at issue in this proceeding, and that pertain to water quality, are as follows: In order to obtain a standard general, individual, or conceptual approval permit under this chapter . . . an applicant must provide reasonable assurance that the construction, alteration, operation, maintenance, removal or abandonment of a surface water management system: * * * Will not adversely affect the quality of receiving waters such that the water quality standards . . . will be violated; Will not cause adverse secondary impacts to the water resources. Section 373.4142, entitled “[w]ater quality within stormwater treatment systems,” provides, in pertinent part, that: State surface water quality standards applicable to waters of the state . . . shall not apply within a stormwater management system which is designed, constructed, operated, and maintained for stormwater treatment Such inapplicability of state water quality standards shall be limited to that part of the stormwater management system located upstream of a manmade water control structure permitted, or approved under a noticed exemption, to retain or detain stormwater runoff in order to provide treatment of the stormwater . . . . Moose Lake is a component of a stormwater-management system that is located upstream of a manmade water control structure. The Permit application did not include a water quality monitoring plan, nor did the Permit require the Applicants to report on the water quality of Moose Lake. During October and November, 2012, Petitioners performed water quality sampling in Moose Lake in accordance with procedures that were sufficient to demonstrate the accuracy of the results. The sampling showed phosphorus levels in Moose Lake of greater than 50 parts per billion (ppb).5/ That figure, though not a numeric standard applicable to surface waters, was determined to be significant by Petitioners because phosphorus may not exceed 50 ppb at the point at which the C-51 Canal discharges from the Acme Improvement District into the Everglades system. Notwithstanding the levels of phosphorus in Moose Lake, Mr. Swakon admitted that “the calculations that are in the application for water quality treatment are, in fact, met. They’ve satisfied the criteria that are in the book.” In response to the question of whether “[t]he water quality requirements in the Basis of Review . . . the half inch or one inch of runoff, the dry versus wet detention . . . complied with those water quality requirements,” he further testified “[i]t did.” Mr. Swakon expressed his belief that, despite Applicants’ compliance with the standards established for water quality treatment, a stricter standard should apply because the pollutant-loading potential of the Complex, particularly phosphorus and nitrogen from animal waste, is significantly different than a standard project, e.g., a parking lot. No authority for requiring such additional non-rule standards was provided. The evidence demonstrates that the Applicants provided reasonable assurances that all applicable stormwater management system standards that pertain to water treatment and water quality were met. Permitting Standards - Design Features and BMPs Provisions of rule 40E-4.301 that remain at issue in this proceeding, and that constitute more general concerns regarding the design of the Complex, are as follows: In order to obtain a standard general, individual, or conceptual approval permit under this chapter . . . an applicant must provide reasonable assurance that the construction, alteration, operation, maintenance, removal or abandonment of a surface water management system: * * * Will be capable, based on generally accepted engineering and scientific principles, of being performed and of functioning as proposed. Petitioners alleged that certain deficiencies in the Complex design and BMPs compromise the ability of the stormwater management system to be operated and function as proposed. Design Features Petitioners expressed concern that the manure bin, though roofed, had walls that did not extend to the roofline, thus allowing rain to enter. Photographs received in evidence suggest that the walls extend to a height of approximately six feet, with an opening of approximately two feet to the roof line. The plan detail sheet shows a roof overhang, though it was not scaled. Regardless, the slab is graded to the center so that it will collect any water that does enter through the openings. Based on the foregoing, the Applicants have provided reasonable assurances that the manure bins are sufficient to prevent uncontrolled releases of animal waste to the stormwater management system or Moose Lake. Petitioners suggested that the horse-washing facilities, which discharge to a sanitary sewer system rather than to the stormwater management facility, are inadequate for the number of horses expected to use the wash facilities. Petitioners opined that the inadequacy of the wash facilities would lead to washing being done outside of the facilities, and to the resulting waste and wash water entering the stormwater management system. Petitioners provided no basis for the supposition other than speculation. Mr. Stone testified that the horse-washing facilities are adequate to handle the horses boarded at the stables and those horses that would reasonably be expected to use the facility during events. His testimony in that regard was credible and is accepted. Based on the foregoing, the Applicants have provided reasonable assurances that the horse-washing facilities are adequate to prevent the release of wash water to the stormwater management system or Moose Lake. Petitioners expressed further concerns that horse washing outside of the horse-washing facilities would be facilitated due to the location of hose bibs along the exterior stable walls. However, Mr. Swakon testified that those concerns would be minimized if the hose bibs could be disabled to prevent the attachment of hoses. The December 2012 Updated BMP Plan requires such disabling, and Mr. Stone testified that the threads have been removed. Based on the foregoing, the Applicants have provided reasonable assurances that the presence of hose bibs on the exterior stable walls will not result in conditions that would allow for the release of wash water to the stormwater management system or Moose Lake. Best Management Practices The Updated BMP Plan for the Complex includes practices that are more advanced than the minimum requirements of the Village of Wellington, and more stringent than BMPs approved for other equestrian facilities in Wellington. Petitioners identified several issues related to the Updated BMP Plan that allegedly compromised the ability of the Complex to meet and maintain standards. Those issues included: the lack of a requirement that the Applicant provide the District with a copy of the contract with a Village of Wellington-approved manure hauler; the failure to require that BMP Officers be independent of the Applicants; the failure to require that the names and telephone numbers of the BMP Officers be listed in the permit; and the failure of the District to require that violations by tenants be reported to the District, rather than being maintained on-site as required. Mr. Stone testified that the BMP conditions included in the Updated BMP Plan were sufficient to assure compliance. His testimony is credited. Based on the foregoing, the Applicants have provided reasonable assurances that the terms and conditions of the Updated BMP Plan are capable of being implemented and enforced. Permitting Standards - Applicant Capabilities Provisions of rule 40E-4.301 that remain at issue in this proceeding, and that are based on the capabilities of the Applicants to implement the Permit, are as follows: In order to obtain a standard general, individual, or conceptual approval permit under this chapter . . . an applicant must provide reasonable assurance that the construction, alteration, operation, maintenance, removal or abandonment of a surface water management system: * * * Will be conducted by an entity with the sufficient financial, legal and administrative capability to ensure that the activity will be undertaken in accordance with the terms and conditions of the permit, if issued. As the owners of the Complex property, the Applicants have the legal authority to ensure that their tenants, licensees, invitees, and agents exercise their rights to the property in a manner that does not violate applicable laws, rules, and conditions. Regarding the financial capability of the Applicants to ensure the successful and compliant operation of the Complex, Mr. Stone testified that the entity that owns the Applicants, Wellington Equestrian Partners, has considerable financial resources backing the Complex venture. Furthermore, the Applicants own the property on and adjacent to the Complex which is itself valuable. As to the administrative capabilities of the Applicants to ensure that the activities on the site will comply with relevant standards, Mr. Stone testified that an experienced and financially responsible related entity, Equestrian Sport Productions, by agreement with the Applicants, is charged with organizing and operating events at the Complex, and that the Applicants’ BMP Officers have sufficient authority to monitor activities and ensure compliance with the BMPs by tenants and invitees. Mr. Stone’s testimony that the Applicants have the financial and administrative capability to ensure that events and other operations will be conducted in a manner to ensure that the stormwater management system conditions, including BMPs, will be performed was persuasive and is accepted. The fact that the Applicants are financially and administratively backed by related parent and sibling entities does not diminish the reasonable assurances provided by the Applicants that the construction, operation, and maintenance of the Complex will be undertaken in accordance with the Permit. Petitioners assert that many of the events to be held at the Complex are sanctioned by international equestrian organizations, and that their event rules and requirements -- which include restrictions on the ability to remove competition teams from the grounds -- limit the Applicants’ ability to enforce the BMPs. Thus, the Petitioners suggest that reasonable assurances cannot be provided as a result of the restrictions imposed by those sanctioning bodies. The international event rules applicable to horses and riders are not so limiting as to diminish the reasonable assurances that have been provided by the Applicants. Based on the foregoing, the Applicants have provided reasonable assurances that construction and operation of the stormwater management system will be conducted by entities with sufficient financial, legal, and administrative capability to ensure compliance with the terms and conditions of the permit. As a related matter, Petitioners assert the Applicants failed to disclose all of their contiguous land holdings, thus making it impossible for the District to calculate the actual impact of the Complex. Although the application was, for a number of items, an evolving document, the evidence demonstrates that the Applicants advised the District of their complete 59+- acre holdings, and that the Permit was based on a complete disclosure. The circumstances of the disclosure of the Applicant’s property interests in the area adjacent to the Complex was not a violation of applicable standards, and is not a basis for denial of the Complex permit. Permitting Standards - C-51 Basin Rule The final provision of rule 40E-4.301 that is at issue in this proceeding is as follows: In order to obtain a standard general, individual, or conceptual approval permit under this chapter . . . an applicant must provide reasonable assurance that the construction, alteration, operation, maintenance, removal or abandonment of a surface water management system: * * * Will comply with any applicable special basin or geographic area criteria established in Chapter 40E-41, F.A.C. Mr. Hall testified the Complex violated permitting standards partly because it failed to comply with the C-51 Basin rule, Florida Administrative Code Rule 40E-041, Part III, pertaining to on-site compensation for reductions in soil storage volume. Mr. Waterhouse testified that the C-51 Basin rule does not apply to the lands encompassed by the Acme Improvement District permits, including the Complex property. The C-51 Basin rule was promulgated in 1987, after the issuance of the original Acme Improvement District permit. The District does not apply new regulatory standards to properties that are the subject of a valid permit or its modifications. Therefore, the area encompassed by the 1978 Acme Permit, and activities permitted in that area as a modification to the 1978 Acme Permit, are not subject to the C-51 rule. The Joint Prehearing Stipulation provides that “Chapter 373, Fla. Stat., Chapter 40E-4, Fla. Admin. Code, and the Basis of Review for Environmental Resource Permit Applications within the South Florida Water Management District (July 4, 2010) are the applicable substantive provisions at issue in this proceeding.” The Stipulation did not identify chapter 40E-41 as being applicable in this proceeding. Given the testimony of Mr. Waterhouse, which correctly applies standards regarding the application of subsequently promulgated rules to existing permits, and the stipulation of the parties, the C-51 Basin rule, Florida Administrative Code Rule 40-E-041, Part III, does not apply to the permit that is the subject of this proceeding. Therefore, the stormwater management system does not violate rule 40E-4.301(1)(k). Consideration of Violations Florida Administrative Code Rule 40E-4.302(2), provides, in pertinent part, that: When determining whether the applicant has provided reasonable assurances that District permitting standards will be met, the District shall take into consideration a permit applicant’s violation of any . . . District rules adopted pursuant to Part IV, Chapter 373, F.S., relating to any other project or activity and efforts taken by the applicant to resolve these violations. . . . Petitioners have identified several violations of District rules on or adjacent to the Complex property during the course of construction, and violations of District rules associated with the Palm Beach International Equestrian Center (PBIEC), the owner of which shares common managers and officers with the Applicants, for consideration in determining whether reasonable assurances have been provided. Violations on or Adjacent to the Complex On March 22, 2012, the District performed an inspection of the Complex property. The inspection revealed that the Applicants had constructed the linear berm along the eastern side of the Property that was the subject of the January 25, 2012, application for modification of the Permit. The construction was performed before a permit modification was issued, and was therefore unauthorized. A Notice of Violation was issued to Far Niente Stables II, LLC, on March 22, 2012, that instructed Far Niente Stables II, LLC, to cease all work on the Complex. Several draft consent orders were provided to Far Niente Stables II, LLC, each of which instructed Far Niente Stables II, LLC, to cease and desist from further construction. Construction was not stopped until April 18, 2012. The matter was settled through the entry of a Consent Order on May 10, 2012 that called for payment of costs and civil penalties. The berm was authorized as part of the March 26, 2012 Complex permit modification. All compliance items were ultimately completed to the satisfaction of the District During inspections of the Complex by the parties to this proceeding, it was discovered that yard drains had been constructed between the stables and connected to the stormwater management system, and that a bathroom/utility room had been constructed at the north end of the horse-washing facility. The structures were not depicted in any plans submitted to the District, and were not authorized by the Permit. The yard drains had the potential to allow for animal waste to enter Moose Lake. The Applicants, under instruction from the District, have capped the yard drains. No other official compliance action has been taken by the District. A permit condition to ensure that the yard drains remain capped is appropriate and warranted. At some time during or before 2010, a mound of fill material was placed on the derby and grand prix field to the north of the Complex to be used as an event obstacle. Although there was a suggestion that a permit should have been obtained prior to the fill being placed, the District has taken no enforcement action regarding the earthen mound. Petitioners noted that the Complex is being operated, despite the fact that no notice of completion has been provided, and no conversion from the construction phase to the operation phase has been performed as required by General Condition Nos. 6 and 7 of the Complex permit. Such operations constitute a violation of the permit and, as such, a violation of District rules. However, the District has taken no official action to prohibit or restrict the operation of the Complex pending completion and certification of the permitted work and conversion of the permit to its operation phase. The construction of the berm, yard drains, and bathroom/utility room, and the operation of the Complex, causes concern regarding the willingness of the Applicants to work within the regulatory parameters designed to ensure protection of Florida’s resources. However, given the scope of the Complex as a whole, and given that the violations were resolved to the satisfaction of the District, the violations, though considered, do not demonstrate a lack of reasonable assurances that District permitting standards will be met. Violations related to the PBIEC At some time prior to February 13, 2008, one or more entities affiliated with Mark Bellissimo assumed control and operation of the PBIEC. When the facility was acquired, the show grounds were in poor condition, there were regulatory violations, it had no BMPs of consequence, there were no covered horse-wash racks, and the wash water was not discharged to a sanitary sewer system. After its acquisition by entities associated with Mr. Bellissimo, the PBIEC was substantially redesigned and rebuilt, and BMPs that met or exceeded the requirements of the Village of Wellington were implemented. The PBIEC currently has 12 arenas that include facilities for show jumping events, and nine horse-wash racks. The PBIEC has the capacity to handle approximately 1,700 horses. On March 14, 2008, the District issued a Notice of Violation to Far Niente Stables V, LLC, related to filling and grading of an existing stormwater management system and lake system at the PBIEC; the failure to maintain erosion and turbidity controls to prevent water quality violations in adjacent waters; the failure to maintain manure and equestrian waste BMPs; and the failure to transfer the PBIEC stormwater management permit to the current owner. On October 9, 2008, Far Niente Stables V, LLC, and the District entered into a Consent Order that resolved the violations at the PBIEC, required that improvements be made, required the implementation of advanced BMPs, and required payment of costs and civil penalties. On January 12, 2011, a notice was issued that identified deficiencies in the engineer’s construction completion certification for the stormwater management system improvements, horse-wash facility connections, and other activities on the PBIEC. Although completion of all items required by the Consent Order took longer -- in some instances significantly longer -- than the time frames set forth in the Consent Order,6/ all compliance items were ultimately completed to the satisfaction of the District. On January 7, 2011, the District issued a Notice of Violation and short-form Consent Order to Far Niente Stables, LLC, which set forth violations that related to the failure to obtain an environmental resource permit related to “Tract D and Equestrian Club Drive Realignment.” The short-form Consent Order was signed by Far Niente Stables, LLC, and the compliance items were ultimately completed to the satisfaction of the District. Based on the foregoing, the violations at the PBIEC, though considered, do not demonstrate a lack of reasonable assurances that District permitting standards will be met for the Complex Permit.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law set forth herein it is RECOMMENDED that the South Florida Water Management District enter a final order: Incorporating the June 29, 2012, Order of Standing and Timeliness; Approving the issuance of Surface Water Management System Permit No. 50-00548-S-203 to Far Niente Stables II, LLC; Polo Field One, LLC; Stadium North, LLC; and Stadium South, LLC.; and Imposing, as an additional condition, a requirement that the unpermitted yard drains constructed between the stables be permanently capped, and the area graded, to prevent the unauthorized introduction of equine waste from the area to the stormwater management system. DONE AND ENTERED this 26th day of April, 2013, in Tallahassee, Leon County, Florida. S E. GARY EARLY Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 26th day of April, 2013.
Findings Of Fact The Petitioner is the owner of five acres of undeveloped real property in Henderson Creek Basin, Naples, Collier County, Florida. The property is dominated at the tree canopy level by medium-sized cypress. The mid-story plant association is made up of a varying mix of wax myrtle, dahoon holly, seedling cypress, and a lesser amount of slash pine. Hypercium, stillingia, poverty grass, and xyris are the major components of the ground cover. In the vicinity of the proposed homesite, the ordinary mean water depth averages 2-4 inches, as indicated by the water marks on the stems of cypress, stillingia, and cypress knees. Based upon the dominant vegetation, the project site is within the jurisdiction of the Respondent for the regulatory purposes set forth by law. The Petitioner intends to build a house on the property for his personal use. In order to construct the residence, the Petitioner applied to the Respondent for a dredge an fill permit. In the application,, the Petitioner seeks a permit which would allow him to place 1,200 cubic yards of sand fill over a .17 acre area of the submerged land. The proposed location for the housepad, septic tank and drainfield is the center of the five acre parcel. This is the predominant area in which the Petitioner seeks to place the fill. A large portion of this part of the property is low and consists of wetlands. The project, as it is designed in the permit application, does not provide the Respondent with reasonable assurance that the applicable water quality standards for the geographical area will continue to be met. In fact, the proposal demonstrates that a violation of the standards will occur. The Petitioner recently cleared 14,340 square feet of the wetlands in the proposed homesite area. The cypress trees which ware removed acted as a pollution filtration system and aided in the cleansing of the standing waters on site. These waters eventually percolate down to the aquifer to become an important source of fresh water for the state. Without the trees, the water will lose an important aid in the natural purification process. In addition to the adverse impact on water quality, the project will interrupt the natural water flow and filtration which has historically occurred when the water located in the low wetland area on the property has overflowed and eventually run into Henderson Creek. The Respondent is required to consider this natural condition in its determination as to whether or not a permit should be issued. The Respondent has indicated that certain changes should be made to the project in order to make it eligible to receive a permit. The Respondent suggested that the Petitioner relocate the fill area for the house pad eighty- five feet to the west of the proposed site. The septic tank and drainfield should be moved one hundred and ten feet to the west. The drive should be reduced to a single lane which leads directly to the housepad. In addition, three culverts should be placed under the drive. The purpose of these modifications would be to minimize the impact of the project on the wetland site. The movement of the project away from the cypress area would minimize the damage to water quality that would occur if the septic system were placed in the wetlands. If the design for the lane and driveway were modified, the harm to the natural sheet flow of the water through the area on its route to the creek would be greatly reduced. Another suggested modification was to remove exotic vegetation which has been planted or which has begun to dominate in some areas because of the clearing of the property which took place before and after the Petitioner purchased the property. The Respondent also seeks a construction plan from the Petitioner which demonstrates that the fill areas will be adequately stabilized and that turbidity will be controlled during construction. The final modification suggested by the Respondent was for the Petitioner to place a deed restriction on the property which would protect the planting areas and the remainder of the wetlands on the site. The Petitioner's expert, Gary L. Beardsley, has recommended that the proposed circular entrance driveway be eliminated and that a single and straightened lane be substituted its place. He further recommended that one 12" diameter culvert should be installed under the lane near the housepad in order to facilitate or equalize any sheet flow on the downstream side. This recommendation is made to substitute for the agency's proposal that three culverts be placed under the straightened lane. In addition, the Petitioner's expert recommended that the septic drainfield be moved 30 feet westward to reduce the fill slope requirements by abutting the house and septic fill pads. The Petitioner should also be required to replant 5,265 square feet of wetland area that he cleared on site with the approval of the Collier Natural Resource Management Department, but without the approval of the Respondent. The Petitioner has not agreed to any of the proposed modifications, including those proposed by his own expert. The Respondent's request for a deed restriction is not necessary to the agency's regulatory function. There was no reason for the request presented at hearing by the agency.
Findings Of Fact The Parties The Applicant, Trail Ridge Landfill, Inc. (Trail Ridge), is a corporation formed in 1989 for the purpose of developing a landfill project and providing waste disposal capacity for the City of Jacksonville. Trail Ridge Landfill, Inc. is a wholly-owned subsidiary of Waste Management of North America, Inc. Its operating division is involved in the waste collection, recycling and disposal business. Waste Management of North America, Inc. is a wholly-owned subsidiary of Waste Management, Inc., which is involved in all facets of solid waste collection and disposal nationally. The Florida Department of Environmental Regulation (DER) is an agency of the State of Florida charged with the responsibility of regulating solid waste management facilities and with permitting their initial construction and operation. It is charged with reviewing applications for permits for construction of such facilities, for reviewing applications for dredge and fill permits in wetlands or waters of the State and, as pertinent to the project involved in this proceeding, for storm water management and storage of surface water and the regulation thereof through its permitting and enforcement authority contained in Chapters 403 and 373, Florida Statutes, and Titles 40C and 17, Florida Administrative Code. The Petitioners are Coastal Environmental Society, Inc. (CESI), a not- for-profit Florida corporation established for the purpose of protecting natural resources. St. Johns Preservation Association, Inc. (SJPA), also a not-for- profit Florida corporation established for the purpose of protecting the community, including environmental concerns; Baldwin-Maxville Coalition, Inc., also a not-for-profit corporation established to promote the health and welfare of its community, including environmental concerns; William McCranie, a resident of Jacksonville, Florida; Darryl Sperry, a resident and citizen who lives 1 1/4 miles from the proposed landfill site in Baker County. All Petitioners have been established to be substantially affected by the proposed permitting and the projects related thereto and all have met pertinent standing requirements as a matter of fact and law. The Respondents do not contest the standing of the Petitioners. Background and Purpose of the Project The purpose of the proposed landfill facility is to address the solid waste disposal needs of the City of Jacksonville and Duval County (the City). The City currently disposes of solid waste at two landfills. One is on the east side of Jacksonville on Gervin Road, and the other is located in the north area of Jacksonville on Island Road. The presently used, east landfill is an unlined landfill currently operated pursuant to a DER Consent Order, in connection with which closure of that landfill is planned. The north landfill consists of three unlined cells and one lined cell. The City currently has unused landfill capacity at these two landfills which will last approximately one more year, but has also sought approval for expansion of the north landfill which would provide about two more additional years of capacity, if approved. The proposed landfill project, if approved, constructed and operated, would meet these solid waste disposal needs for approximately 20 to 25 years. The project at hand began when the City issued a Request For Proposal for private companies to submit bids to the City for construction of additional landfill capacity somewhere to the northwest of Jacksonville in Duval County. Two companies that met qualifying requirements submitted proposals in response to the request for proposals. Trail Ridge was one of those two qualifying bidders. The City selected the Applicant for contract award and then entered into a contract. The Applicant has an option to purchase the proposed landfill site from Gilman Timber and Land Company (Gilman, Gilman Paper Company). After issuance of the permits to the Applicant, the option would be exercised. Thereafter the property would be immediately conveyed to the City from the Applicant. Thus the site of the proposed facility will ultimately be owned and controlled by the City, although the Applicant will operate the landfill under its contract with the City. Gilman presently uses the 1,288 acre site and several thousand surrounding acres for growing timber, principally pine trees, in a pine plantation-type operation grown for use as pulp wood. Much of the site and surrounding Gilman land is characterized by pine trees grown to an age of 20 years or less and then harvested. A great deal of the site property has recently been cut, chopped, plowed re-bedded and re-planted with pine trees. Although some of the site is characterized by mature timber, much of the timber has been recently planted or is otherwise timber not yet mature enough for harvest. The option agreement provides that Trail Ridge will purchase the property from Gilman for $10,000 per acre. The City will then purchase the 1,288 acres from the Applicant for $2,600 per acre, which the Applicant maintains is the current, fair-market-value for the land as it is currently used as pine plantation for growing pulp wood. These terms and conditions are a part of the City's Request For Proposals. In addition to paying the Applicant $2,600 per acre for the 1,288 acre site, the City will pay the Applicant a fee over the life of the operation of the proposed landfill. The fee, amortized over the 20- year span of the agreement, will make up the difference between the Applicant's $10,000 per acre purchase price paid to Gilman and the City's $2,600 per acre initial purchase price paid to the Applicant. The City will thus ultimately re- pay Trail Ridge the $10,000 per acre for the purchase price for the property. The Applicant corporation will operate the landfill over its entire useful life and then close it. Thus, the Applicant's own figures show the land is valued at $3,348,800. The record does not reflect the reason for the purchase price paid to Gilman being $12,880,000, of which the City will repay $9,000,000 to the Applicant in the form of the operation fee, over and above the initial payment to the Applicant of $3,348,800. In any event, the utilities payment to the Applicant of the $12,880,000 for the land and the operation of the landfill only represents the recompense to the Applicant for the purchase funds expended for it to buy the site from Gilman. Additionally, the Applicant, through its option agreement with Gilman, is required to pay Gilman a $60,000 per month option fee. $15,000 per month of that must be paid during the pendency of the option, with the remainder of the $45,000 monthly fees due upon closing of the purchase. The portion of the operation fee paid by the City over and above the $2,600 per acre initial purchase price, attributable to the land appraisal itself, will be paid by the City on the basis of a certain dollar fee-per-ton of solid waste handled and disposed of in the landfill by the Applicant. Testimony indicates this will be approximately $8.00-$15.09 per ton, although the evidence as to which amount is indefinite. The testimony of Applicant's witness Allen, in any event, references these amounts as applicable to the City's solid waste "stream" handled by Trail Ridge at the proposed facility. Its contact with the City assures the Applicant of a minimum of 569,000 tons of waste per year to which the fee would apply. The City currently generates approximately 750,000 tons of waste per year. There is no evidence of what the construction or other capital costs or operation expenses related to the proposed facility will be over the useful life of the facility for the Applicant or related corporations. Site and Design The proposed site is 1,288 acres in size, located in southwestern Duval County, approximately three miles south of Interstate Highway 10, 1.5 miles west of U.S. Highway 301 and 1.14 miles north of State Road 228. The site is located in a sparsely populated area approximately 4 to 6 miles from the City of Baldwin, 5 miles from the City of Macclenny and 2 miles from the City of Maxville. A substantial portion of the proposed site will be left undisturbed and used as a buffer area to separate it from any surrounding development. There are water supply wells within fairly close proximity to the site. One well is within a mile of the site and three are approximately 1.5 miles southeast of the site. The proposed facility will include both a Class I and Class III solid waste disposal area. The Class I area will be approximately 148 acres in size, and the Class III area, 28 acres. The Class III disposal area will only be used for non- household refuse such as construction debris, tree and shrubbery clippings and the like, which will not generate deleterious substances in liquid or gaseous form, as will the Class I landfill. The remainder of the 1,288 acres will be used for buffer zones, dirt borrow areas, storm water management facilities and ancillary facilities necessary to the day to day operation of the landfill. No part of the Class III disposal area will be located within 200 feet of jurisdictional wetlands, which are the closest bodies of water. The project will be located on "Trail Ridge," which is a relatively elevated geographic feature, extending generally in a north-south direction in western Duval County. Geologically, it is an ancient sand dune. There is a substantial decline in elevation of this portion of the ridge from west to east, which produces surface water drainage patterns in a west to east direction at the site, also accompanied by surface water drainage patterns in a southerly- northerly direction into wetlands which occur on the south and north verge of the site, because the site is a prong or easterly extension of Trail Ridge lying between wetlands which occur on the northerly, southerly and easterly boundaries of the Class I disposal site. The 1,288 acres, including the landfill sites themselves, have been used for silvi-culture practices since 1948 or earlier, and are currently managed primarily as a slash pine plantation grown for pulp wood purposes. The present owner of the site, Gilman Paper Company, plans to continue this use of the site should the landfill project not be approved and constructed. Since 1948, the entire site, including much of the wetlands thereon, have been logged, some portions of it as many as three times. The silvi-culture practices at the site include clear- cutting, chopping, burning, harrowing, tilling and bedding of the soil, and planting of pine trees. The pine trees are grown to be harvested on a 20-year cycle or less. Due to these intensive silvi-cultural practices, the natural conditions of the site have been significantly altered and much natural vegetation, such as bottom-land hardwoods, has been replaced by planted pine trees. The area has been extensively ditched for drainage purposes and logging roads have been constructed throughout the site. The design of the Class I disposal area of the landfill includes three major components: a liner system, which includes a permanent leachate collection and removal system, a cap and closure system and a gas control system. The Class I disposal area is designed to be 140 feet high when the landfill is completed and closed in approximately 20-25 years. It will have typical landfill refuse "lifts," of approximately 8 to 12 feet in height, with a side slope grade of three horizontal feet to one vertical foot of elevation gain. This is the maximum grade steepness allowed by DER rules. The Class III landfill, in which no household garbage, chemicals, oils and greases or other deleterious substances will be deposited, will include only a cap and closure system. In order to carry out Department regulatory requirements designed to contain waste permanently in a well- defined area and to minimize the amount of leachate produced within a landfill, as well as to collect and remove leachate that is produced, the landfill will have, in effect, a double liner system. The liner system is designed to contain the leachate produced when rain water contacts waste in the landfill and to cause that leachate to percolate vertically downward through the landfill, capture it in the liner system, prevent it from contacting groundwater and to remove it and treat it. Leachate from the Class I disposal area will be contained by the liner system and removed by a leachate collection and removal system. The liner system, starting from the bottom and proceeding upward, will consist of a 6 inch thick layer of compacted, subgrade soil. Over that layer, a prefabricated "bentonite" clay-like material will be deposited. Directly over the bentonite layer will be a high density polyethylene liner (the secondary liner) called a "geomembrane." The bentonite material has the characteristic of swelling when contacted by a liquid so that, if the geomembrane leaks, the bentonite will swell and plug the hole in the liner above it. On top of the bentonite layer and the geomembrane layer, is a synthetic drainage material called "geonet." Geonet has a very high transmissivity rate and therefore has great capacity to conduct water within its own plane. Lying immediately above the geonet material is a geotextile filter designed to keep sand out of the pores or interstices of the geonet. Above that geotextile filter is a second geomembrane (the primary liner). Above the second geomembrane is another geonet layer, as well as another geotextile filter layer. Then to protect the entire liner system from damage, two feet of clean sand will be placed above the uppermost geotextile filter layer. The two feet of sand also acts as a drainage layer for the uppermost geonet. The leachate that percolates down through the waste and the sand will contact the geonet and then be carried down slope on top of the geomembrane. This constitutes the leachate collection system. The bottom geonet is called the "leak detection system." This is because, if a hole develops in the primary liner, any leachate coming through the hole will be quickly drained away through the bottom geonet. The bottom geonet thus operates as a backup leachate collection system, since any leachate reaching the bottom geonet will also be discharged into the leachate removal system. If a leak should develop in the secondary liner, the bentonite material would quickly plug the leak, swelling and absorbing that liquid. The Petitioners have stipulated that the Applicant has proposed a liner system and leachate collection system for the Class I disposal area which meets all criteria of Chapter 17-701, Florida Administrative Code, except as to the requirements of Rule 17-701.050(5)(c), (e)3. and 4. and (f)3., Florida Administrative Code. The Applicant demonstrated that the liner system and leachate collection system will meet the criteria of Rule 17- 701.050(5)(c), Florida Administrative Code. The liner system will be installed in accordance with a quality assurance plan. A specific condition already agreed upon will require the Applicant to submit for approval a revised quality control and assurance plan for installing the Class I synthetic liner system, after selection of the liner manufacturer and prior to the liner's installation. The liner system is designed so that it will be protected from puncture by waste materials or landfill operation equipment. In addition to the two feet of sand placed on top of the entire liner system to protect it, when initial waste disposal begins, the first lift of waste across the entire area of the liner system, as it is installed in phases, will be composed of 6-8 feet of "select waste" to protect the liner from puncture. Select waste is waste containing no pipes, roots or other potentially puncturing objects which could penetrate the sand layer to damage the liner system. A quality assurance engineer will be on site full-time supervising the initial placement of the select waste until that phase of the landfill operation is completed. A grant of the permit should be so conditioned. The Applicant has established that the liner system and leachate collection system will meet the criteria of Rule 17-701.050(5)(e), Florida Administrative Code. The leachate depth on top of the primary and secondary liners will not exceed a foot because the geonet has the capacity to quickly remove leachate from the liner. The actual hydraulic head of leachate on the primary liner will be only approximately 1/4 inch. The depth on the secondary liner was shown to be even less. The liner system and leachate collection system will meet the criteria of Rule 17-701.050(5)(e)3. and (f)3., Florida Administrative Code. The design of the collection system, including the geotextile filter, will prevent clogging of the system throughout the active life and closure period of the landfill, primarily by placing a gravel aggregate around the collection pipe so as to prevent debris from entering the system. A pilot line will also be installed in each collection pipe to facilitate access for mechanical cleaning, should it be necessary. In the unlikely event of an obstruction in the system, the leachate would simply bypass that area and continue down-grade to the next downstream leachate collection pipe and be removed from the landfill for treatment by that means. The liner system and leachate collection system will also meet the criteria of Rule 17-701.050(5)(e)4., Florida Administrative Code. The leachate collected will be carried downhill to pipes at the east end of the landfill. The leachate will then be pumped from the pipes into storage tanks. Trucks will then be filled with leachate to be transported to the City's Buckman Regional Wastewater Treatment Plant, owned and operated by the City, for treatment and disposal. Unrefuted evidence shows that this plant has adequate capacity and treatment capability to safely treat and handle the leachate. The truck loading areas will be equipped with berms and other means of protecting the surrounding wetlands, surface and groundwaters from leachate spills during the truck filling process. The Applicant's evidence does not demonstrate, however, that the tanks themselves and the area surrounding them will have protective measures for containing leachate spills. In order to comply with the above rule, the totality of the evidence concerning the leachate collection, disposal system and treatment method demonstrates that the tanks should be accompanied by a surrounding containment system (walls or berms) which will have the capability of containing the entire capacity of a tank should failure of a leachate collection tank or related piping or valving occur. Any grant of the permit should be so conditioned. The Petitioners have stipulated, and the Department agrees, that the Class III disposal area is exempt from the liner system and leachate collection system requirements of the above-cited rule provisions. Covering and Closure System Both the Class I and Class III landfills are designed with a composite soil covering system to minimize the amount of rainfall which can come into contact with the solid waste so as to minimize the creation of leachate. During the day to day landfill operations, a 6 inch initial cover will be applied to enclose each Class I landfill disposal cell on a daily basis, except for the working face itself, where waste is currently being deposited. The working face may be left uncovered, so long as solid waste is scheduled to be placed on it within an 18 hour period. A 6 inch initial cover will also be applied once every week to enclose each Class III landfill disposal cell. Thereafter, an intermediate cover of one foot of compacted earth will be applied on top of the initial cover within seven days of initial completion, if a final cover or additional lift on top of that completed cell is not to be applied within 180 days of cell completion. The initial cover will consist of sandy soil, over which will come the intermediate cover of one foot of compacted earth. The final cover will be applied to those portions of the landfill which have been filled with waste to the extent of designed dimensions at the time those portions have been filled. The final cover, to be placed on the sides of the landfill and ultimately upon the top at the end of its useful life, will be placed on top of the 12 inches of intermediate soil layer and will consist of 12 inches of compacted clay with a permeability of 1 X 10/-7 cm/sec. Next will come a layer of 12 inches of compacted soil and then a final layer of 12 inches of top soil, upon which the Applicant will plant grass for erosion control. Erosion of the cover layers on the side slopes is designed to be minimized by closing areas of the landfill as they are filled, an operational procedure commonly referred to as "close as you go." The final cover layers placed on the landfill outside of the clay cap are designed to allow the establishment of a planted grass cover as soon as possible to minimize erosion of the cover material and the side slopes. In addition, the intermediate cover placed on top of and between each cell, beneath the clay layer surrounding the outside perimeter of the landfill, has a high permeability, thereby acting as a drainage layer to direct rainfall and leachate vertically downward to the leachate collection system, as well as to collect runoff so as to retard erosion. Erosion is also retarded, as is the runoff of storm water/leachate over the side slopes of the landfill, by containing storm water which comes into contact with the working face of the landfill cells. This will be accomplished by minimizing the size of the working face to approximately 42 feet width. This will serve to reduce the potential for storm water to contact waste. Additionally, berms will be constructed around the working faces of each active cell which will cause any runoff or storm water which gets inside the working face of the cell to remain there and to percolate through the land fill to eventually be collected as leachate by the collection system. If enough rain falls on the working face of a cell to cause an overflow of storm water over the berms, additional berms placed on the interior slopes of the landfill will catch the overflow and divert it back through the landfill and the leachate collection system. The Applicant contends that normal maintenance equipment and personnel will be able to maintain the exterior side slopes of the landfill and thus minimize erosion. However, if erosion should become a problem, the Applicant proposes to install interceptor berms constructed on the side slopes, accompanied by various geotextural fabrics or synthetic materials proposed to be imbedded on the side slopes to help anchor the interceptor berms. These berms, however, have been demonstrated by Petitioner's witness, Mr. Peavy, to be inadequate to retard erosion. In fact, they may promote erosion because they would be insufficiently anchored to the side slope (as designed with 3:1 slope) and the downhill slope of the berms themselves is considerably steeper than a 3:1 ratio, which will actually promote erosion. The erosion problem will be discussed in further detail infra, but the proposed "optional" berm system, consisting of two proposed berms down the length of the 450 foot side slope will have to be redesigned in order to serve the purpose of retarding side slope erosion. The cap or cover for the exterior side slopes of the landfill will consist of a relatively impermeable clay layer overlain by a sand layer, as well as a top soil layer. Mr. Lithman, an expert in geotechnical engineering testifying for the Applicant, established that as a result of the side slope stability analysis he conducted of the clay layer for the Class I disposal area, that the clay layer would be stable, with a safety factor of 2.9-3, which is more than adequate for a slope as designed for the Class I disposal area (3:1). Mr. Evander Peavy, testifying for the Petitioners and accepted as an expert witness in the fields of civil engineering, soil mechanics, surface water hydrology and hydraulics, agreed that there was an adequate safety factor in the clay cap layer itself and that no plane of failure would likely occur in that layer. The problem, however, lies in the sand layer immediately predetermined or potential plane of failure will occur at the interface between the sand layer and clay layer. This is where the side slope of the landfill is most likely to fail. Failure means that the weight of the sand and soil layers on the outside of the clay layer would exceed the resisting forces, holding them back on the slope of the landfill, which would result in a deformation, slumping or break in the sand layer. If this slumping or break occurs in the sand layer and is not immediately repaired, rain water can erode the clay layer, which is highly erodible if exposed to rainfall. If not redressed soon, this could result in exposure of the waste of the landfill to rain water with the result that leachate could seep out of the side slopes of the landfill and enter surface waters of the State through the functioning of the storm water system. The most likely layers a civil engineer would analyze to determine the stability of the side slope would be the sand and soil layers above the clay layer because they are the weaker layers in terms of adhesion, shearing and resistance to downward movement under stress. However, Mr. Lithman, Trail Ridge's expert who conducted a side-slope stability analysis, only analyzed failure in the clay layer initially, until he was called on rebuttal to address findings of Mr. Peavy. The DER rule provision that allows 3:1 ratio side slopes for the sides of such landfills only serves as a guideline or maximum steepness criteria for design engineers. It does not relieve an engineer from analyzing slope stability in accord with good engineering practices. Analyzing side slope stability must be done in terms of establishing "safety factors." An acceptable safety factor for a landfill is 1.5 because, if failure occurs, solid waste can quickly be uncovered which can cause leachate contamination to surface waters of the State. A safety factor of 1.5 is the commonly accepted factor for earthen dam design because of the risks posed by failure of such slopes or embankments. Mr. Peavy is extensively experienced in the design of earthen dams and similar earth works, including extensive analysis of slope constituents and design for stability under shear forces and other failure-inducing factors, as well as for resistance to erosive forces. He was engaged in such phases of engineering work for approximately 26 years, during which period he designed and oversaw construction of numerous dams, revetments and other earthen embankments and works of many types. Because of this, and because of the commonly accepted engineering methods and calculations he used in analyzing the stability and integrity of the side slopes of the landfill, involving plane of failure analysis and erosion damage analysis, his testimony is credited over that of the other witnesses testifying on the subject matters involving side slope integrity of the landfill. Because of this, a safety factor was established for the side slopes of the landfill, for the sand and soil layers of 1.5. Safety factors of 1.25 are indeed commonly used for highway embankments, but highway embankments are not designed with predetermined or potential planes of failure, such as is involved at this landfill (as presently designed) between the sand-soil layers and the clay layer. Trail Ridge's expert witness in this area, Mr. Lithman, had testified that a safety factor of 1.25 would be adequate because it was typical of DOT earthen embankments for roadways. Mr. Niehoff testified that a 1.3 safety factor was sufficient. In fact, however, Mr. Peavy, testifying for the Petitioners, calculated the safety factor of the side slopes of the landfill to actually be 0.85, using his initial assumption of a weight for a cubic foot of the sand-soil layer of approximately 100 pounds. Mr. Niehoff testifying for Trail Ridge found no basic fault with Mr. Peavy's analysis of the safety factor and alleged that his analysis was done with accepted engineering procedures, but only with use of slightly different assumptions. He testified that if he had used the same assumptions as Mr. Peavy, he would have reached the same conclusions. Mr. Peavy also calculated his safety factor again by employing the same equation used by Trail Ridge's expert, Mr. Lithman, and assumed instead that the unit of sand-soil layers was 125 pounds per cubic foot, as did Mr. Lithman. This assumption coupled with the internal angle of friction of 35 degrees used by Mr. Peavy, which was shown to be a conservative assumption, resulted in a calculated safety factor of 1.05, which is still unacceptable, even under Mr. Lithman's analysis, because Mr. Lithman opined that the safety factor should be 1.25. Using Mr. Peavy's equation, but his own assumptions as to angle of friction and weight per cubic foot of the sand-soil layer, Mr. Niehoff, testifying for the Applicant, calculated a safety factor of 1.3. This safety factor also is unacceptable because it is less than the 1.5 safety factor established as proper by Mr. Peavy's testimony and, indeed, if Mr. Lithman's safety factor of 1.25 could be deemed acceptable, the 1.3 figure would result only in a marginal safety factor at best. The major difference between the safety factor calculations of Mr. Peavy and Mr. Niehoff is that Mr. Peavy assumed that the sand-soil layer above the clay layer would be saturated, while Mr. Niehoff assumed that only 19 inches of the 24 inch sand-soil cover layer would be saturated by rainfall. However, Trail Ridge's own experts, Mr. Lithman and Mr. Niehoff, offered conflicting testimony between themselves on the amount of saturation to be expected. Like Mr. Peavy, Mr. Lithman did his analysis on the basis that the sand-soil layers would be saturated completely, contrary to Mr. Niehoff's subsequent testimony that this would not happen beyond a 19 inch depth in the layer. Mr. Niehoff's conclusions that the sand-soil layer would not become saturated or valid only if there is a complete grass cover over the entire side slopes of the landfill. He admitted that if the sand-soil layer became saturated, the safety factor would only be 1.1 or less according to his own calculations. Trail Ridge offered no preponderant evidence to establish that an adequate grass cover could be established so as to prevent saturation of the sand-soil layer during the design 25-year, 24-hour storm event (approximately 8- 9 inches rainfall in 24 hours). The evidence indicates, rather, that establishing and maintaining a grass cover on the side slopes of the landfill will be very difficult to achieve on a uniform, completely grassed basis. This is because of erosion and because of the damage by equipment necessary to repeatedly repair erosion damage and because of the fact that much of the side slopes of the landfill will be, in effect, under construction until the landfill is completely built out and completed at the end of approximately 20 years. Even if the lower several lifts of the landfill, when covered on the "cover as you go" basis can achieve them, more recently deposited, will not have a complete grass cover. Thus, there is a substantial likelihood of saturation of the sand-soil layer, during storm events of the type for which the landfill is designed. Further, the volume of water that would saturate into the sand-soil layer, even if the landfill was completely grassed, will still be sufficient to totally saturate the lower 90 feet of the landfill side slopes above the clay layer in the event of a 25-year, 24-hour storm event. If the sand-soil layers become saturated, sloughing or failure of those layers will occur at the toe of the landfill. If that occurs, then the clay layer, protective cap can be quickly eroded by subsequent rainfall and surface runoff. This will cause the waste within the landfill to be exposed to rainfall, generating leachate which can migrate to the surface of the landfill and thence to the storm water system and ultimately to the surface waters of the State. No provisions have been made in the design to remove water from the sand-soil layers once it reaches the area near the toe of the landfill to prevent sand-soil layer failure. The impermeability of the clay layer would prevent the rainfall from migrating through the clay layer and continuing to the interior bottom of the landfill to be collected properly as leachate because the clay layer properly should be an impermeable barrier to storm water. Thus, a saturated condition of the sand-soil layers would be most likely to cause their sloughing and failure near the toe of the landfill, with resulting damage by erosion or cracking to the clay layer with the effect of allowing leachate to escape to surface waters of the State. Although the Applicant's expert, Mr. Lithman, opined that side slope stability had not been a problem with the 3:1 ratio slopes at the City's Rosemary Hill Landfill, he admittedly was unaware of the height or length of the side slopes of that landfill. The longer the side slopes and the higher the landfill, the more likely it is that the sand-soil layers will become saturated and fail during design storm events or shortly thereafter, especially as the landfill, in its later years is built both longer and higher toward its final configuration. Further, Mr. Lithman and the Applicant's evidence does not reveal the composition of the side slopes of the Rosemary Hill Landfill, in terms of whether or not the clay and sand-soil layers designed in the proposed landfill are present. Due to the height of the proposed landfill, the lengths of its side slopes and the absence of design features such as terraces and benches, failure of the side slopes, especially in the later years of the landfill's life and, indeed, after closure (closed landfills can generate leachate) is likely to occur, based upon the facts established through Mr. Peavy's testimony. The likely side slope failure is a result of the design flaw and is not a problem which can be cured by normal operation and maintenance activities. Indeed those activities may aggravate the problem through their deleterious effect on the establishment of a uniform, complete grass cover. Because of the height of the proposed landfill, the length and slopes of its sides and the lack of design features such as benches or terraces, it is likely to experience significant side slope erosion due to storm water. The volume of rain water that would accumulate and flow down the sides of the landfill will achieve velocities which would destroy even a well established grass cover, especially in the later years of the landfill's life when the sides have reached significant length and height. Storm water would thus gain sufficient velocity to destroy a grass cover and to particularly attack those portions where the grass cover is incomplete, thinned or possessed of an insufficient root mat to hold the soil. Once erosion starts, small rills will form which will soon develop into deeper gullies, ultimately penetrating the sand-soil layer. It can then quickly erode away the resulting exposed clay cap layer, exposing the waste to storm water. Leachate could thus leak from the landfill. Because of the present design of the Class I landfill, the only way to repair erosion damage is to push material from the bottom with heavy machinery, such as bulldozers. These erosion maintenance activities themselves would prevent the establishment of a uniform solid grass cover. The presently operated East Landfill in Duval County exhibits both side slope failure and erosion damage due to rainfall on its 3:1 slopes, including damage to the grass cover. Erosion damage to the slope layers due to erosion maintenance activities of the type which would be necessary to repair damage at the proposed landfill has occurred. Both erosion and side slope failure will ultimately result in exposure of solid waste to rainfall runoff and assure side slope seepage of leachate. The material eroded or sloughed away from the side slopes can obstruct the drainage conveyance system surrounding the landfill, rendering the MSSW/storm water system inoperative. Because of the presently proposed design of the landfill, it would be impossible to effectively correct side slope erosion or failure, due especially to maintenance activities. Even if a uniform grass cover could be established in the last years of landfill operation and after closure, the great length and slope of sides of the landfill by that time would result in erosion even if the grass cover were initially uniform and solid on the entire slope of the landfill. A change in the design of the landfill, however, whereby 15 foot wide benches or terraces would be incorporated into the sides of the landfill every 20 or so vertical feet, would likely prevent the side slope erosion and failure established to be likely by Mr. Peavy. In fact, benches or terraces similar to those found to be required by Mr. Peavy have had to be recently installed at the East Landfill in Duval County in order to resolve side slope erosion and failure problems on those 3:1 slopes. The mere installation of interceptor berms, as depicted in TRL Exhibit 28, would not alleviate side slope failure and erosion problems, but rather would aggravate them and would reduce the safety factor of the side slopes to 0.5. Consequently, in order to grant the permit, it should be conditioned on the landfill being re-designed and constructed so as to incorporate benches or terraces at approximately 20 foot intervals on the slope of the landfill from bottom to top. Although this may potentially reduce the volume of space within the landfill, depending on how it is accomplished, it has been established that, without the use of the bench or terrace system, pollutant leachate cannot be reasonably assured to be prevented from entering State waters and wetlands. Leachate Control Leachate is any water coming in contact with solid waste. The chemical constituents of leachate which are present and will be present in the Duval County solid waste stream, to be disposed of at the proposed landfill, include chlorobenzene, volatile organics of various types, benzene, acetone, phenolic compounds, gasoline constituents, chloroform, methylethylketone, methylene chloride, toluene, xylene, ethylbenzene, total organic carbon, nitrogen, phosphorus and metals such as aluminum, chromium and zinc. Leachate thus contains toxic, hazardous and priority pollutants which will be disposed of in the landfill. The breakdown and degradation of solid waste can also generate additional toxic or hazardous compounds and substances. Leachate can potentially be discharged in a proposed landfill into groundwater and surface waters in a number of ways, including leakage from the bottom of the landfill liner into groundwaters, including into the Class I storm water pond and surface waters of the State through discharge from the groundwater into the storm water pond system. It could also be deposited into the storm water system through spillage of leachate where tanker trucks are loaded, through seepage of leachate through the side slopes of the proposed landfill by damage to the integrity of those side slopes as found above. The Petitioners maintain that side slope seepage of leachate will occur because the permeability of the intermediate cover layers surrounding the cells of the landfill is significantly less than the permeability of solid waste. This will have the result, according to Petitioners, that leachate will migrate horizontally through the intermediate cover layers to the sides of the landfill. Once there it arguably would migrate to the surface of the landfill side slopes through erosion of the outer cover, and fissures in the clay due to drying from exposure to the sun and through erosion. Additionally, the Petitioners maintain that leachate will migrate downward through the peripheral intermediate cover layer under the clay and contact the impermeable clay anchor cap, build up hydraulic head pressure and thus seep out through landfill sides near the toe of the landfill. The Petitioners maintain that Trail Ridge's policy and proposal to punch holes in the intermediate cover layers atop the cells of the landfill to encourage downward migration of leachate and discourage horizontal migration of leachate through the intermediate cover layers will be ineffective because the intermediate cover is more permeable than the solid waste itself so that punching holes in the intermediate cover to allow the leachate to migrate down through solid waste will actually not occur. Additionally the Petitioners contend that the filter system and the storm water pond will not treat the dissolved chemical components of the leachate specified in Petitioner's Exhibit 2 and that these dissolved components will move through the sand filters into waters of the State. Contrary to Petitioner's contentions, however, the Applicant has demonstrated that leachate will not avoid capture by the leachate collection system by seeping horizontally through the cover or cap and out the sides of the landfill, provided that the side slope failure and erosion prevention measures found to be necessary in the above Findings of Fact are instituted in the design, construction and operation of the landfill. The design of the cap and closure system is basically a side slope seepage prevention system, except for the absence of terraces or benches. The intermediate soil cover beneath the clay cap and surrounding each cell of the landfill acts as a drainage medium. It will channel any seepage of leachate from the cells of solid waste through the permeable, intermediate soil cover, generally in a downward direction, both in and between the cells of the landfill throughout its cross-section, as well as downward through the intermediate soil cover lining immediately beneath the clay cap around the periphery of the landfill. This system, if the above design deficiency is corrected, will tend to force the leachate downward into the collection system, as opposed to horizontally out the cover or the sides of the landfill. The reason this system will work in this manner is because the intermediate cover soil is more permeable than the solid waste itself. The permeability of the intermediate cover will promote vertical movement of the leachate because, as the leachate migrates across each cell, it will encounter the vertical, intermediate soil cover layer at the side of each cell and that will promote its moving downward toward the collection system. The water in the landfill will thus follow the path of least resistance, so that the vertical portions of the intermediate cover layers surrounding each cell and surrounding the sides of the landfill beneath the clay cap, coupled with the force of gravity, will provide a preferential path downward toward the leachate collection system. This finding includes consideration of the Petitioners' contention that leachate will migrate downward and contact the impermeable clay anchor cap and build up head pressure so that it will seep out of the sides at the toe of the landfill. The intermediate cover layer underlying the sides of the landfill beneath the clay anchor cap is connected with the leachate collection system underlying the bottom of the landfill. Thus, a continuous conduction of leachate down through the intermediate cover, permeable layer will allow the leachate to seep downward all the way to the leachate collection system rather than pooling behind the impermeable clay anchor cap. This condition will be enhanced by the fact that surrounding each cell is the approximately vertical, permeable intermediate cover layer, throughout the entire cross-section of the landfill, such that much of the leachate will migrate downward in the interior of the landfill. Because of the ready conductance of leachate in a downward direction by the intermediate cover layers, Trail Ridge's policy of punching holes in the intermediate cover layer on the top of each cell in order to seek to prevent side slope seepage of leachate will be ineffective because the intermediate cover is more permeable than the solid waste. Thus, this procedure is unnecessary and, in fact, could become counter-productive to the extent that punching holes in the intermediate cover would allow rain water mixed with leachate to contact more of the solid waste contents of the landfill as it migrates down through the interior of each solid waste cell. This would result in a more highly concentrated form of leachate, which could pose more deleterious threats to ground and surface waters should it escape to ground and surface waters. Therefore, any grant of the permit should be conditioned on a prohibition of the Applicant thus violating the integrity of the intermediate cover layer overlying each cell as the landfill is built up in lifts. Gas Control System The Class I disposal area is designed with a gas control system which will prevent explosions and fires caused by the accumulation of methane gas due to decomposition of the waste in the landfill. The gas control system will prevent damage to the vegetation on the final cover of the closed portions of the landfill or vegetation beyond the perimeter of the property. It will prevent objectionable odors off site. The Petitioners have stipulated that the Applicants' gas control system will be designed in accordance with Rule 17- 701.050(5)(j), Florida Administrative Code. Although the Petitioners presented testimony of various persons who live in close proximity to other landfills, which were at one time operated by Waste Management subsidiary companies, neither the persons who testified of odor problems at those landfills, nor other witnesses presented testimony to show whether any of the landfills utilized a gas control system or one of equivalent design to that proposed for the subject facility. No evidence was presented to support a finding that the proposed landfill facility would produce objectionable odors to any significant degree. The Petitioners have further stipulated that the Class III disposal area is exempt from the gas control system requirements set forth in Rule 17- 701.050(5)(i) and (j) and (6)(i), Florida Administrative Code, and the Department agrees. Hydrogeology and Ground Water Monitoring The Applicant filed as part of its application, and placed in evidence, a hydrogeological survey and groundwater monitoring plan, contained in TRL Exhibit 51. The hydrology of the proposed landfill site may fairly be characterized as complex because it contains many different features such as recharge and discharge areas, varying zones of conductivity, a sand component to the surficial aquifer as well as a rock aquifer component and multi-directional groundwater flows. Additionally, wetland systems occur down-gradient from the higher levels of the surficial aquifer on the north, east and south sides of the proposed Class I disposal area. From the surface grade down to a depth of approximately 100 feet lies the surficial aquifer, which primarily consists of a coarse sand medium. Lying below the sand aquifer is a confining unit (relatively impermeable) identified as the Hawthorn Group, which consists of denser marls, dolomites and silver clays. Beneath the Hawthorn layer, at a depth of approximately 300-400 feet, is the Floridan aquifer, which serves as the principal deep water supply source for this part of Florida. Additionally, immediately above the Hawthorn layer in the deep zone of the surficial aquifer, a "rock aquifer" exists under a portion of the landfill site, generally the eastern-most portion. It was not shown to be continuous throughout the site. The rock aquifer is connected to the sand surficial aquifer lying above it. Zones of varying higher and lower permeability occur at various places within the surficial aquifer. Generally, groundwater at the site flows down-gradient in an easterly direction, caused by rain or surface water recharging the surficial aquifer on the higher portions of Trail Ridge, including the western side of the landfill Class I disposal site. The surficial aquifer then discharges this groundwater to the land surface and the wetlands lying on the eastern side of the site. Additionally, some northward and southward flow of groundwater occurs from recharge areas to the wetlands lying on the northerly and southerly boundaries of the Class I disposal site in the wetlands. The specific condition 19 contained in the Department's Notice of Intent to issue permit and draft permit requires the Applicant to periodically (quarterly) sample monitoring wells to ensure that water quality standards are not exceeded at the boundary of a zone of discharge established by that specific condition and authorized by Rule 17-28.700(4)(a), Florida Administrative Code. A groundwater monitoring plan has been developed by the Applicant, with accompanying hydrogeological survey as mandated by Rule 17-28.700, Florida Administrative Code. The proposed groundwater monitoring system consists of 42 monitoring wells in and around the area of the proposed Class I and Class III landfill sites. The system is designed to monitor upgradient and downgradient flows in wells constructed to sample from the shallow and intermediate zone and from the deep zone (to some extent) on the east boundary of the Class I disposal site. Specific condition number 18 of the Notice of Intent to grant the permit and draft permit, to which the Applicant has agreed, requires that a detailed chemical characterization of a representative sample of leachate be performed, so as to allow for any necessary modifications to the list of chemical substances to be analyzed in water samples drawn from the monitoring wells on a quarterly basis. Although there are up-gradient monitoring wells for the shallow and intermediate portions of the surficial aquifer, there are no upgradient monitoring wells for the deep zone of the surficial aquifer. There are no upgradient monitoring wells on the west side of the landfill in the deep zone. The deep zone of the surficial aquifer is the zone between the intermediate zone and the top of the Hawthorn confining bed. The rock aquifer is present beneath the proposed landfill site and was encountered at well locations B-7, B-8, B-12 and B-14. That rock aquifer is hydrologically connected to and part of the deep zone, which is hydrogeologically connected throughout the site to the uppermost portions of the surficial aquifer lying beneath the landfill. The rock aquifer is a significant source of drinking water in Duval County and the surrounding northeast Florida area and is used as a supply source for domestic and commercial wells within one and one-half miles of the landfill Class I site. "Sinkers" are immiscible liquids contained in landfill leachate that are denser than water. When released from the landfill they would sink to the first low permeability unit in the surficial aquifer. This would be at the bottom of the surficial aquifer at the rock unit. Once they encountered a lower permeability unit or strata, sinkers would then move in a more lateral direction downgradient in undetermined directions. The silty clay layer depicted on Figure 9 of TRL Exhibit 51 would intercept those sinkers and cause them to tend to move in a direction toward the silty clay layer intercepted by well B-1. At that point the sinkers would then have a tendency to move in a north or south direction on top of the confining zone. The direction those sinkers would move, following a gradient, cannot be determined at present from the groundwater monitoring plan because no deep wells are proposed in either of those areas which could detect sinkers. The groundwater monitoring plan is thus not adequate for the deep zone or to detect pollutants that could migrate off site in the rock aquifer because there are no monitoring wells in the deep zone on the west, north and south sides of the Class I landfill area. Monitoring for sinker compounds in the deep zones is thus insufficient and water supply wells nearby in the deep zone would be at risk because there is no way to detect pollutants between those water supply wells and the source of the pollutants at the landfill. The groundwater monitoring plan is inadequate because there is insufficient information to determine the direction of water flow in the deep zone. Sufficient upgradient monitoring wells in the deep zone are necessary in order to determine the direction of water flow in the deep zone which will in turn indicate where additional deep zone monitoring wells should be located to detect contaminants migrating off site. Leachates also contain contaminant constituents or compounds called "floaters." Floaters are immiscible liquids which are lighter or less dense than water. They tend to float on top of the groundwater table. The hydrologic information depicted with the application and the Applicant's evidence is not sufficient to determine where floaters might migrate. The shallow monitoring wells referenced in TRL Exhibit 42 would not adequately detect floaters at or near the water table surface. Due to the lower lying stream or wetland systems on the north and south side of the Class I landfill on Trail Ridge, groundwater flows in the vicinity of those areas are likely moving northward and southward to some extent. Thus, TRL Exhibit 51, and particularly Figure 14 of that exhibit, is insufficient to support a determination of where monitoring wells should be located because it does not include the impact of the stream or wetland systems on the north and south sides of the landfill. Groundwater contours bend into the stream areas on the north and south sides of the landfill which would indicate groundwater flow to the south and the north instead of just from west to east. The general shape of these contour lines would resemble the contour lines depicted in Figure 16 of TRL Exhibit 51. These contour lines bend back to the east and the west on the north and south sides of the Class I landfill. Since there is groundwater flow to the north and to the south from the Class I landfill, intermediate and deep monitoring wells in addition to shallow wells, should be located along the west, north and south sides of the landfill. Because they are not in the groundwater monitoring plan thus far, the plan is inadequate. A grant of the permits should be conditioned on such additional wells being installed and made a part of the monitoring program, in accordance with the above findings. A zone of discharge for the proposed landfill has been established pursuant to Rule 17-28.700(4)(a)2., Florida Administrative Code, which is intended to extend vertically from the base of the surficial aquifer and horizontally 100 feet beyond the footprint of the landfill or to the compliance groundwater monitoring wells, whichever is less. (See pages 611- 618 of the transcript.) Therefore, even if the groundwater monitoring wells are closer than 100 feet to the footprint of the landfill, they are to be used for monitoring for compliance with applicable water quality standards, including the primary and secondary drinking water standards for G-II groundwater, as contained in Rules 17-550.310 and 17-550.320, Florida Administrative Code. The Applicant has agreed to this location of the wells, their spatial relationship to the footprint of the landfill, to the zone of discharge and to their use for compliance purposes. Storm Water and Surface Water Management System The Applicant proposes as part of its permit application a storm water discharge and surface water management system. The application for permitting for that system was submitted to the DER which reviewed it using the Water Management District's permitting criteria set forth in Chapters 40C-4 and 40C- 42, Florida Administrative Code. Pursuant to its independent permitting authority set forth in Section 373.413, Florida Statutes, the DER noticed its intent to issue the MSSW permit to the Applicant, based upon its opinion that the project will comply with applicable rules. The proposed storm water discharge/surface water management system (MSSW system) will utilize roadside swales, perimeter ditches, catch basins, culverts, detention ponds and pump stations to manage storm water in compliance with Chapters 17-25, 40C-4 and 40C-42, Florida Administrative Code. The solid waste disposal areas will operate as watersheds, routing storm water in to the MSSW system. The retention areas have been designed to handle the retention treatment requirements of a 25-year, 24-hour "design storm" runoff, resulting from approximately eight to nine inches of rainfall. The system is comprised of three independent parts; the Class I landfill system, the Class III landfill system and the separate roadway surface water management system. The Class I system will use temporary berms to intercept storm water runoff from the cap cover system of the landfill, on top of the solid waste disposal area. These top berms will divert the storm water runoff to regularly spaced pipes which will convey the storm water into the perimeter swale located at the foot of the landfill side slopes. The runoff will then be diverted through a culvert into a concrete-lined perimeter ditch which will convey it to the pond. The top berms of the landfill also operate as erosion control features, capturing and channelling some storm water runoff away from the side slopes of the landfill, thereby assisting in erosion control. The Class I retention pond covers an area of approximately ten acres and will contain approximately 43 million gallons of water at design water levels. The peak flow of storm water runoff from a design 25-year, 24-hour storm can be accumulated and released at predetermined rates. The runoff from the first one inch of rainfall in a 72 hour period is retained and stored in the pond. No discharge will be allowed to the pond's outfall system, rather all the outfall from the runoff from the first inch of rainfall will be routed through the sand filter system prior to discharge. When storm water runoff enters the pond, it will mix with the water already in the pond and become part of the total water column. When a rainfall event then produces greater than one inch of rainfall, some water will have to be discharged from the pond by passing it through the sand filter and then discharging through the outfall structure. The water discharged is water which was already resident in the pond before the rainfall event, mixed with the current rainfall runoff from that hypothetical rainfall event. The volume of the pond is so large that storm water runoff will constitute a very small fraction of the actual water volume in the pond at any given time. On the average, it will take 33 days for a given molecule of storm water runoff to travel through the pond, the sand filter and then be discharged through the outfall system. the sand filter system operates on a water level trigger device involving floats in wet wells attached to electrical switching mechanisms. When a certain water elevation in the wet wells, reflective of the elevation in the pond, is reached, the pumps automatically start and pump water into the filter chambers, causing the water to flow over a filtering sand. The filter will be maintained periodically by lowering of the water level to permit removal and replacement of the top six inches of sand in the filter. The Class III storm water pond is similar in design to the Class I pond except that it will not use a top berm. Rather, a perimeter swale will function similarly to the Class I landfill top berm, intercepting storm water runoff from the top and side slopes of the Class III landfill. The Class III storm water pond is equipped with the same type of filtration and pumping system as the Class I pond. The Class III system is designed also to retain the first inch of storm water runoff from a "design storm" rainfall in a 72 hour period. All of that runoff from the first inch of rainfall will likewise be routed through sand filtering prior to discharge. The roadway storm water system utilizes grassed roadside swales to act as a retention structure to filter the storm water runoff. The runoff retained in the swales will be conveyed by pipe to a smaller detention and dispersion pond located between the Class I and Class III disposal areas and built with the same design constraints as the Class I pond. The roadway system will not use a pumping system to operate, but rather discharge will occur through natural action of gravity through the dispersion pond. The filtered storm water runoff from the Class I and Class III disposal areas will be discharged into adjacent wetlands after it leaves the ponds. The discharge will be performed by a wetland irrigation system. The irrigation system will discharge the filtered storm water through conveyance pipes to the wetland boundaries. There a series of perforated pipes will extend outward from the conveyance pipes themselves and serve as a means of gradually releasing the filtered storm water into the wet land area as a means of wetland replenishment and mitigation. Concerning the issue of surface water quality, it has been established that the sand filtering systems on the Class I and Class III storm water ponds are capable of providing 100 percent of the treatment required by State water quality standards when considered in conjunction with the treatment capability of the ponds themselves as natural lake systems. The individual sand filters each provide twice the capacity for treatment necessary which equates to a safety factor of 2. With both filters operating, there is a combined safety factor of 4. Although the Class I and Class III retention ponds are designed with filtration systems, the primary pollution removal system will be the ponds themselves operating as natural lakes. Once storm water enters the ponds, the average residence time is adequate to allow the biological processes of uptake and assimilation to function to remove the bulk of the pollutants, including those derived from any spillage of leachate into the storm water management system and ultimately deposited into the ponds. The volatile organic compounds which can occur in the leachate can largely be removed simply by the process of evaporation, due to the adequate retention time of any leachate- containing storm water which reaches the ponds. It has been established that, due to the storm water pond's natural treatment mechanisms, especially the long retention time, the size and volume of the ponds, as well as the vegetated sides of the ponds, that, considering also the operation of the filter system, the water discharging from the Class I and Class III storm water treatment facility will have very low concentrations of total nitrogen, phosphorous, biochemical oxygen demand (BOD), suspended solids and heavy metals. The Applicant's expert witness on water quality and water chemistry, Dr. Harper, also assumed that the Class I retention pond would have some leachate migration into the pond through groundwater influx. Worst case scenarios were used to estimate this possible influx and the results established a maximum deposition of 2.46 gallons of leachate into the pond over a 65 day period. This amount would be diluted by a factor of 14 million solely by new storm water runoff and rain normally expected under average rainfall conditions during such a 65 day period, without even considering the considerable dilution by the existing water volume of approximately 43 million gallons already in the pond in such a period. Dr. Harper's testimony is accepted. It is unlikely that any runoff can enter the retention pond on one day and then exit within one day's time through the outfall overflow device. Even assuming that runoff occurs in excess of the designed one inch, that runoff would dilute with the large volume of water already present in the storm water pond. Thus, the new storm water would be mixed, diluted and subject to natural biological processes and the process of evaporation (of volatile organic compounds), operative in the pond before it can be released through the outfall structure. The runoff will enter the pond at the west end and discharge through the opposite or east end of the pond. The majority of water caused to be discharged through the outfall because of a larger-than-design storm event runoff would thus actually be water already present in the pond as opposed to incoming runoff from the recent rain event being deposited in the west end of the pond where the storm water system discharges from the Class I disposal area. Even a rainfall event producing twice the designed-for volume would produce no effect on the water quality of the discharge. Further, along with the filter systems and the natural processes of biological uptake, assimilation as well as evaporation in the natural lake system which would operate in the pond, the side slopes of both ponds will be vegetated so as to further assist in uptake and removal of any pollutants present in the runoff, further mitigating any potential for water quality impacts. It has been established that the surface water management system is designed to segregate surface water from leachate by minimizing the size of the landfill working face and reducing the potential for storm water to contact waste and become leachate. Further, a berm will be constructed around each working face which will encompass the entire active cell of the landfill, causing any runoff water entering the working face to remain there and percolate through the landfill to the leachate collection system, rather than entering the storm water system. If a severe rainfall event could cause leachate to overflow those berms, the design includes additional berms on the interior slopes of the landfill to catch that overflow and divert it back through the leachate collection system. The berms are relocated as the working face of the landfill changes, so they will continue to fulfill these functions on an ongoing basis. In terms of a worst case event, the Applicant has also established that the estimated impact of runoff from approximately one acre of exposed solid waste entering the retention pond would still cause no water quality impacts. Further assurance of leachate segregation from surface waters is provided in a spillage control plan which would be activated in the event of leachate spillage from a tanker truck. In connection with this, any grant of the permit should be conditioned upon an adequate berm system surrounding the tank truck leachate filling device in order to contain any such spill to prevent the leachate from entering the storm water retention facilities and surface waters. Such a system should also be characterized by (and the permit conditioned upon) retention berms or other forms of containment being placed around each leachate storage tank, designed to retain the full capacity of such a leachate storage tank in the event of a catastrophic tank valve, piping or other failure. It has been demonstrated, moreover, that if the leachate-storm water separation and control system were to fail in some way so that leachate directly entered the retention pond, the volume of leachate entering the pond would have to exceed approximately 150,000 gallons to cause any water quality violation in the storm water retention pond, even assuming the high concentration of contaminants in the leachate envisioned in the opinion of Dr. Robert Livingston, the Petitioners' aquatic ecologist and toxicologist. He raised concerns that pollution of the head water systems of the St. Johns and St. Mary's Rivers might result from the operation of the project. The Applicant has rebutted the concerns expressed by Dr. Livingston and Dr. Parks and established reasonable assurances that toxins and contaminants occurring in leachate will not deposit in surface waters of the State in any significant or rule-violative amounts for the reasons expressed in the above Findings of Fact. Draw-Down Effects The Petitioners contend that there will be a draw-down of groundwater levels in surrounding wetlands caused by these storm water ponds and associated pumping, in violation of the Water Management District's rules and policy embodied in MSSW Handbook Section 10.6.3. This section presumes an adverse impact on wetlands will result if the system causes the groundwater table to be lowered more than five feet lower than the average dry season low water table. The Petitioners' expert in this area, Dr. Motz, estimated that a measurable draw-down of groundwater of one to two feet in the wetlands water table would extend outward as far as maybe 1,000 feet in all directions from each of the storm water ponds. Dr. Motz used a large error convergence factor in his calculations, however, and also used a model for a confined aquifer, which was not shown to exist at the subject site. He did not use a model which should be appropriate for unconfined or semiconfined aquifers which the evidence reveals is the more appropriate hydrogeology which would be employed in groundwater modeling for the subject site. Dr. Motz' use of a large error convergence factor can potentially result in an answer which is far from the actual appropriate draw-down figure. Numerical models are approximations of reality and the smaller the error convergence factor, then the closer to the real number of the cone of depression, or draw-down level, the model will give. Consequently, the use of an analytical groundwater, cone of depression model was shown by the Applicants' witnesses to give a more accurate result, especially in view of the large error convergence factor employed by Dr. Motz in his numerical model. It was not shown that Dr. Motz had actually "calibrated" the groundwater model he employed. The Applicants' hydrogeology expert, Don Miller, used three analytical and two empirical methods to determine radius of influence or draw-down from the storm water ponds and calibrated the models he used. Validating the data or calibrating the model is a way of making sure the model actually represents the situation intended. Calibration is performed in this instance by inputting some data and then seeing if the model itself could accurately predict the remainder of the data of interest. Using these various methods, Dr. Miller arrived at a range of radius of influence likely to occur from the Class I storm water pond of 167 feet to 184 feet at the western end of the pond and approximately 40 feet at the eastern end. The maximum radius of influence for the Class III storm water pond was shown to be approximately 160 feet at the western end and 0 at the northeastern corner. The other hydrogeology expert for the Applicant, Dr. Leve, performed a separate analytical analysis of draw-down using the Southwest Florida Water Management District's "KOCH" model to produce a projected radius of influence of approximately 167 feet, which is comparable to the projections of Dr. Miller. In conjunction with this, it was shown that Dr. Motz' use of a small value for groundwater infiltration and the large error convergence factor served to increase his predicted radius of influence in an inaccurate way. Dr. Motz also used a higher value for transmissivity or hydraulic conductivity ("K"). The Applicant's experts relied on the average of the actual permeability test results obtained for the site. A different figure for transmissivity or hydraulic conductivity results from Dr. Motz taking into account two test wells in which hydraulic conductivity could not be measured because the well water level rose too quickly to obtain a measurement. Consequently, he predicted or assumed that that factor might affect the hydraulic conductivity at the site by a whole order of magnitude, which resulted in his 1,000 foot prediction for draw-down cone of influence. The problem here is that the evidence does not demonstrate clearly that this much- greater hydraulic conductivity factor with regard to these two wells, which was an isolated incident compared to all other wells tested, is not some mechanical or human error in the installation or evaluation of the wells. Further, even if one predicts the hydraulic conductivity of the unmeasured, apparently highly conductive wells at the geometric mean of all the hydraulic conductivity measurements for the water table zone (except for the marl zone) at 3.0 X 10 cm/sec or three times greater than the value used by the Applicant, it would result in a cone of influence of 265 feet instead of 184 feet. If one also assumed a value for the two ignored wells, as data points, by assuming that they had a hydraulic conductivity value of 3.5 x 10/-3 cm/sec, the highest reported well conductivity value, and then employed that in the empirical formula used by Donald Miller, it would still not greatly exceed the 265 foot cone of depression number. No evidence was adduced to demonstrate that a cone of depression of that magnitude would have any adverse affect on the wetlands, especially in view of the recharging of the wetlands through the storm water pumping and irrigation system. In summary, the totality of the evidence in the Applicant's case, especially on rebuttal, demonstrates that Dr. Motz' methodology significantly overestimated the radius of influence for draw-down at both storm water ponds. The parties agree that the maximum draw-down of 16 feet would occur within the Class I storm water pond, where a "seepage face" would be formed where the pond would cut into the water table through earth borrowing activities. The maximum draw-down inside the Class III storm water pond, where a seepage face would be formed by the excavation into the water table to construct the pond, will be 14 feet. The lowered groundwater within the storm water ponds is due in part to the natural sloping land surface of that area and the concurrent natural slope of the water level before the ponds are even excavated. The slope of draw-down will decrease rapidly, that is, much of the 14 foot or 16 foot apparent draw-down amount will be the result of the relatively sheer seepage face formed by the pond excavation. At the top of that seepage face, the groundwater cone of depression will flatten out considerably and very rapidly so that, as the slope of the draw-down decreases rapidly in the immediate vicinity of the pond, the groundwater outside the ponds themselves will actually be lowered less than five feet. The groundwater levels used in the application were based upon seasonal high water level for the site, rather than "average dry season low" water levels, as referenced in Section 10.6.3 of the Water Management District's Applicant's handbook. Therefore, the projected draw-downs are very conservative and would overestimate the actual draw-down for dry season low water table groundwater levels. Consequently, the weight of the evidence supports the Applicant's predictions on the effects of draw-down. The evidence demonstrates that draw-down from the storm water ponds associated with both landfills will have either no impact or minimal impact on wetland species, either transitional or submerged, in the surrounding wetlands. Silvi-culture activities on the site have considerably altered the area and lowered the natural water table through the construction of drainage structures by the timber company in the past. In general, the wetland jurisdictional lines from the storm water ponds are based on United States Army Corps of Engineers (Corps) wetland criteria and thus do not contain species generally considered to be wetland species for purposes of DER dredge and fill or Water Management District MSSW jurisdictional purposes. Many species used by the Corps in determining jurisdiction, such as slash pine, can grow both in uplands or wetlands. The edges of the areas delineated as jurisdictional wetlands are dominated by transitional and upland plant species such as slash pine, gallberry, palmetto, grapevine and huckleberry, which can tolerate dry conditions. It is only as one's investigation proceeds waterward or toward the center of the delineated wetlands, (in which area the land surface slopes down- gradient at the same area where the draw-down cone of influence rapidly diminishes to an insignificant level), that the plant species change to those species adapted to regular and periodic inundation for purposes of the State agencies' wetlands jurisdiction. The draw-down maximum for any wetland location using the maximum projected radius from Dr. Miller's efforts of 184 feet, (17 feet beyond the projection based upon the Water Management District's model), is on the southwest edge of the Class I pond. Maximum draw-down there will be 24' inches at the wetland boundary line, that is, the Corps jurisdictional boundary line where the dominant plant species are transitional or upland plants such as slash pine, gallberry and bay trees. Pine trees at this point exhibit tall and vigorous growth which indicates that the water table, before installation of the ponds, is already well below the surface, otherwise these upland trees would lack sufficient oxygen to grow if water levels were closer to the surface. The potential draw-down here would thus have little effect on this vegetation. There will be essentially no draw-down effect further down-gradient beyond the DER Water Management District jurisdictional boundary, where the pines are already of diminished stature because of water existing close to the land's surface and where DER wetland jurisdictionally-listed plants predominate. The draw-down at the wetland boundary line on the southeastern part of the Class I pond will be 9 2/3 inches. Wetland species which could be affected are found 50-60 feet beyond that radius of influence at this point. The radius of influence on the northern side of the Class I pond will not cross any wetland boundary until it widens at the northwestern corner. The maximum draw-down at the wet land line near the northwestern corner of the pond would be approximately 15 1/2 inches. Here again the predominant plant species are the upland species of slash pine and gallberry and thus the draw-down will have little effect on those species for reasons mentioned above. On the western edge of the Class III pond is an isolated wetland for purposes of the Water Management District MSSW and Corps jurisdiction only. The edge of that wetland is dominated by slash pine and gallberry. The estimated draw-down on the boundary line of that land in the area dominated by slash pine and gallberry is six inches. There will be no draw-down from that Class III borrow pond area in any wetland dominated by transitional or submerged species. In addition to the above considerations and factual findings concerning the effect of the draw-down, the Applicant is proposing an irrigation systems as delineated above, which will deliver water to the wetlands to mitigate and replenish any minimal impacts of groundwater draw-down. The irrigation system will increase the degree and duration of saturation of the soils at the wetlands' boundary. This will mitigate any minimal effect of draw- down and may actually have the effect of enhancing the health and quality of the wetlands over time, from the wetlands' boundary waterward. In order that the irrigation system will pose the maximum benefit and most closely imitate the natural systems, the irrigation system will be designed for flexible operation. A wetlands ecologist will review the wetlands quarterly and adjust the irrigation system as necessary, as to location and operational regime, in order to properly maintain the health, including water levels and hydro-periods in the wetlands. The Applicant has agreed that the grant of the permit be conditioned to allow for this ongoing quarterly investigation and adjustment. Dr. Motz indicated in his testimony his belief that, to a large extent, the water pumped to the wetlands through the irrigation system would simply immediately migrate to the groundwater and immediately back to the storm water pond, through the effects of the draw-down, and not serve the purpose of replenishing the wetlands. He admitted, however, that he did not know whether the proposed irrigation system would work or not. The Applicant's expert witness in this regard, Dr. Leve, established that the irrigation system would effectively distribute water into the wetlands and saturate the surface due to the "mound effect" of water at the irrigation systems' discharge point at the wetland boundary. He used a standard, generally-accepted "mounding model" to predict the effects of the mounding for the irrigation system. Mounding is a hydrogeological phenomenon whereby water will mound up and create a zone of saturation in the soil at the point of discharge to the ground surface. Mr. Leve ran that model for a cross-section of each of the storm water pumps. He also ran the model for two different values of groundwater inputs into the ponds. A figure of 28,800 gallons of groundwater infiltration into the pond per day, as predicted by the Applicant's expert witnesses, and the 100,000 gallon per day groundwater input predicted by Dr. Motz was used. For both cross- section locations examined by Dr. Leve, the discharge of 28,000 gallons per day at the wetland boundary would raise groundwater levels by approximately three inches. The discharge of 100,000 gallons per day at the same locations through the irrigation system would increase water levels by approximately nine inches. These calculations ware based upon the discharge of the groundwater inputs into the storm water pond only. Discharge additionally of the inputs from storm water runoff from the surface of the landfill into the pond and then through the irrigation system would also be delivered into the wetlands as warranted. Additionally, a berm system will prevent surface water runoff from entering the north dirt borrow area. A berm will be constructed at the eastern boundary of the north borrow area to maintain an interior water elevation of 125 feet or one foot above the natural ground, whichever is higher. Water levels will thus be maintained at the north borrow area so that there will be no lowering or de-watering of the groundwater table. Additionally, storm water will be diverted by berms along the west end of both the Class I and Class III landfills upgradient and into the wetlands, so that the adjoining wetlands receive significant surface water recharge that previously did not flow into those wetlands. Mitigation A mitigation plan was proposed for purposes of both the dredge and fill permit application and, in the solid waste landfill application, for the MSSW permitting. It was incorporated into the draft dredge and fill permit and draft landfill permit incorporated in the Department's Notice of Intent to issue. The mitigation plan and other measures will offset the impacts from filling and other activities caused by the project in both the dredge and fill and MSSW jurisdictional wetlands on the site. The proposed mitigation measures include the creation of 4.76 acres of new wetlands; the irrigation of the wetlands surrounding the Class I and Class III storm water ponds, as delineated above, and the diversion of surface water around the landfills into the wetlands to aid in their recharge. A high quality, forested wetland will be created utilizing the reliable method of mulching and, an extensive hardwood planting program which will include red maple, sweetgum, cypress and tupelo trees. The created wetland will contain deep water and transitional zones. The area will be monitored to insure 80 percent survival of the trees planted and routine maintenance will be performed. Approval of this mitigation plan and any issuance of the permits should include the requirement that rapid replanting be done to replace any dead trees and such approval should also be conditioned on the use of the largest trees possible to be planted, by appropriate tree planting equipment, so that the beneficial uptake and filtering functions, as well as wildlife habitat functions of such hardwood wetlands can begin operating as a mitigatory factor as soon as possible. The created wetland area will replace lost wetlands with a wetland type of higher quality and potentially higher habitat function, depending upon the maturity of the trees planted (see above condition). The wetland replacement ratio attendant to the creation of this wetland area is proposed to be 2.8:1 and the permit should be conditioned on at least that ratio being observed in the mitigation wetland installation plan. Although there was some testimony critical of the wetland creation proposal because it would alter 4.76 acres of uplands which might be of significance to the wildlife in the area, in fact the site of the mitigation area is currently pine plantation which has been greatly altered from its natural state. It does not currently provide high quality upland wildlife habitat. Additionally, only 30-40 percent of the uplands on the entire tract will be altered by the entire project construction proposed. This leaves a majority of the uplands presently on the site in their current condition to the extent that it serves as wildlife habitat at the present time. A conversion of the subject area into a high quality hardwood forest wetland, which would remain bordered by upland on one side in any event, will not have any significant impact on the present value of the mitigation areas as habitat. Wetlands Assessment and Impacts Through the use of consultant personnel skilled in the fields of surveying, biology and botany, the Applicant established jurisdictional lines demarcating the boundaries of DER jurisdiction for dredge and fill permitting purposes and MSSW permitting purposes in the field and adduced evidence of those boundaries at the hearing. The jurisdictional lines established were conservative in the sense that they reflect the jurisdictional standards of the U.S. Army Corps of Engineers, which is generally landward of the lines which would be established by the plant communities characteristic of DER dredge and fill and Water Management District MSSW jurisdiction. The locations of the flags as placed by the biology-botany consultant were then professionally surveyed and plotted by a trained surveyor such that the jurisdictional line was signed and sealed as a "specific purpose of survey." Further, a biologist met with the surveyors weekly to review the plotted line to ensure accuracy. That survey was submitted to the Department in connection with the applications herein. The Department supports that jurisdictional determination in this proceeding. The Department's own jurisdictional determination staff members were on the sites of the jurisdictional determinations for approximately eight days. The location of the wetland jurisdictional line for purposes of MSSW permitting has not been challenged by Petitioners, and no evidence regarding MSSW jurisdiction has been presented by Petitioners in this proceeding. The wetlands jurisdictional survey prepared by the Petitioners, however, showed "new" DER jurisdictional wetlands which would represent, if accepted, an alteration of the DER jurisdictional wetland boundary. Additionally, the challenge to the DER. jurisdictional determination is restricted by the Petitioners to the area around the Class I landfill footprint and its associated storm water pond. No evidence has been presented regarding the jurisdictional determination for the remainder of the site and project, including the access road. Witness Don Garlic has a degree in marine biology with additional coursework and training in the field of botany, including field training in wetland species. He visited the site for seven days for the purpose of critiquing the dredge and fill DER jurisdictional line established by the Applicant and offered as proof by the Applicant in this proceeding. In the 2-3 mile segment of the jurisdictional line around the Class I landfill and associated storm water pond, Mr. Garlick opined that there were three gaps 18-20 feet wide where he did not agree with the dredge and fill jurisdictional line determination. These areas represented by the gaps, if the gaps were determined to be jurisdictional, would add rather long, linear features of putative wetlands to the jurisdictional wetlands already encompassed by the proposed Class I portion of the project. They would add approximately 1/2 acre of additional DER jurisdictional wetlands impacted by the project. The Petitioners, however, did not establish the duration of water flow at any of the areas in which dredge and fill jurisdiction was contested. Mr. Garlick stated that water was flowing each of the seven days he was on the site, from March 28 to May 8, 1991, but stated that it was raining when he was there on April 23. He did not review rainfall data to determine whether it had rained prior to any of his visits. Likewise, he was not shown to have reviewed any groundwater data or to have performed any tests to ascertain groundwater levels in relation to claiming jurisdiction over the disputed Areas A, B, C and D depicted on Petitioners' Exhibit 8. This site has not experienced a prolonged drought. For the period 1988 through the hearing, only the latter portion of 1990 reflected a significant lack of rainfall based on rainfall data obtained from the National Oceanic and Atmospheric Administration Office (NOAA) at the U.S. Navy's nearby Cecil Field, as well as the Jacksonville International Airport. Nineteen eighty-eight, in fact, had above-average rainfall of 61 inches. The Class I landfill area was originally "flagged" in September and early October 1989. July, August and September 1989 were months of above average rainfall. September 1989 had 14 inches of rain, twice the normal rainfall. Nineteen ninety had slightly less than half of its average rainfall for the year, although it started out with normal rainfall and became dry in the fall months. There has since been twice the normal rainfall for the few months of 1991 prior to the hearing. A drought of the type and duration experienced in the latter part of 1990 would have had no significant effect on the plants at the sites in question (sites A, B, C and D). They are perennial plants that remain year-round and therefore are adapted to drought and flood conditions. (T-2047) 1/ The Applicant's jurisdictional determination based upon dominant plant species, established by its consultant in evidence was based upon perennial plant species. Therefore, the hydrological conditions on the site were normal ones when these areas were originally reviewed in 1989 and the jurisdictional delineations established and the conditions found at the site shortly prior to the hearing in March through early May 1991 by Mr. Garlick were unusually wet conditions and do not reflect the normal conditions prevailing at the site. Mr. Byron Peacock was accepted as an expert in wetlands ecology and botany with a B.S. degree in each of those disciplines, with emphasis on Florida wetland species, especially with regard to Florida fresh water wetlands. Mr. Peacock is quite familiar with the site, having been to the site "dozens of times" since September 1989, almost every month for a 21-month period. Mr. Godley, another of Applicant's expert witnesses, also visited the areas put into contention by Mr. Garlick in his testimony for purposes of testifying in rebuttal and also concluded that these areas were not jurisdictional for purposes of the DER's dredge and fill jurisdiction. Mr. Mike Eaton of DER visited at least one of the areas or sites in contention and was of the same opinion. Mr. Garlick had relied on flowing water being present and the plants present to determine that Area A, a ditch along Hells Bay Road, was a jurisdictional wetland area. The areas on both sides are upland. Mr. Garlick testified that there were breaks in the vegetation in Area A and that the vegetation was sufficient to establish a connection. Area A does not contain sufficient water to support a dominance of listed wetland species under either the "a or b tests," as provided in Rule 17-301.400(1)(a) and (b), Florida Administrative Code. There is upland vegetation growing all the way across the ditch on both sides at its connecting point and point of discharge to dredge and fill wetlands. If the ditch held water it would be wettest at this point of discharge into the jurisdictional wetlands, but the ditch does not contain water on a regular and periodic basis, as established by the testimony of Mr. Peacock. Therefore, the water observed in the ditch by Mr. Garlick would have been surface water runoff from the recent high rainfall. Concerning Area B in the Class I storm water pond footprint, Mr. Garlick indicated that he relied on herbaceous wetland plants as a basis for his finding of that as a jurisdictional area. He used the "b test" vegetation method of at least 80 percent transitional plants, less than 10 percent submerged or upland species, as well as the presence of "other indicators" of regular and periodic inundation for that Area B for purposes of the rule cited last above. Area B is a logging road and lies between upland stands of planted pines. It has been used as a road within the past year and there are "rutted- out" or gouged areas in the road caused by vehicular traffic which have puddled water, but between the puddles are areas dominated by upland vegetation. There is also a clear vegetative break in jurisdiction at the point where Area B connects to the jurisdictional line at Area B's southern end. The vegetation at that connecting point is a mixture of red. root, a transitional plant and many upland species, the dominant one being amphicarpum muhlenbergianum, which looks similar to red root in the field. Mr. Garlick testified that red root was the predominant plant in Area B. Mr. Garlick may have mistaken amphicarpum muhlenberqianum for red root. He was not familiar with that upland species and did not know if it was found at the site. A review of photographs from the 1950s, 1960s, 1970s and 1980s showed that Area B had historically always been uplands. The evidence shows that this area holds water only in limited areas following rainfall and that there is no hydrological, "a or b test" vegetative connection between these areas and jurisdictional waters of the State. Area C, located on the west side of the present West Fiftone Road, also contains part of an old road bed, as well as a ditch. Area C was determined to be within MSSW jurisdiction by the Applicant, but was also claimed as a dredge and fill jurisdictional area by Mr. Garlick for the Petitioner. Mr. Garlick indicated in his testimony that plants in Area C were mixed transitional and submerged species, but were sufficient to make out the area as within DER jurisdiction, based upon those plants. He also testified that different parts of Area C met the "a test" or the "b test." The ditch on the eastern side of Area C is dominated by upland vegetation, including amphicarpum grass, slash pine and goldenrod. The slash pines growing in the ditch, as shown by a photograph in evidence, were several years old. This ditch was dry on all of Mr. Peacock's visits to the site except recently during heavy rains. The remainder of Area C is characterized by a canopy of slash pines, a subcanopy of titi shrub of an upland type, with less than ten percent of the vegetation being characterized by bay and tupelos. There is a ground cover over most of that area consisting of upland species such as chokeberry, gallberry and reindeer moss. This area was determined to be jurisdictional for MSSW purposes because of a wet area in the middle containing fetter bush and sweet gallberry, which are both transitional species for jurisdictional purposes. The entire Area C was delineated as MSSW in the permit application, even though it may not all be jurisdictional, simply for ease of delineation and survey. The MSSW wetland areas within Area C, however, have no vegetative or hydrologic connection to the dredge and fill jurisdictional wetlands. Area C thus does not contain sufficient water or vegetation under either the A or B test connected with other jurisdictional areas to be considered jurisdictional for purposes of the DER's dredge and fill jurisdiction. Area D consists of a rutted trail-road used on a regular basis by persons visiting the tract. There is an upland pine plantation on either side of the roadway. Mr. Garlick contended there was a "flow way" in Area D, but that the vegetation was spotty or sporadic. During the past 21 months, Area D was dry every time Mr. Peacock was on the site, except recently after prolonged, heavy rains. At the eastern end of Area D near its connection to Area C, there is a patch of upland amphicarpum grass, growing all the way across the ditch and road. There is also the presence of beak rush, an upland plant which looks similar to submerged rush. There is insufficient water or wetland vegetation under either the a or b test to establish that this Area D is jurisdictional. The evidence thus did not support the Petitioner's contention that additional dredge and fill wetlands would be impacted by the project. The areas claimed by the Petitioners as additional jurisdictional wetlands did not contain sufficient water to be determined jurisdictional, pursuant to DER Rule 17-301, Florida Administrative Code. These areas held water only at certain times of the year in direct response to heavy or frequent rainfall and were normally influenced, that is, fed, by surface water rather than groundwater. Likewise, these areas did not contain sufficient plant species in the canopy, subcanopy or ground cover to be considered jurisdictional pursuant to vegetation indices and procedures delineated in Rule 17- 301.400(1)(a) or (b), Florida Administrative Code. Mr. Mike Eaton of DER testified and established a 1990 DER policy embodied in a memorandum admitted into evidence explaining how the Department employs the above-cited rule for purposes of using hydric soils in making dredge and fill jurisdictional determinations. Both Mr. Eaton and the DER policy in evidence established that hydric soils are not used by the Department except as an indicator of regular and periodic inundation once "b test" vegetation has been determined to be present for purposes of the above rule. Mr. Garlick testified that he used hydric soils as a "back up" to jurisdictional determinations based upon hydrology and plants. He did not identify any area where his jurisdictional determination was based on soils alone. The Department policy memorandum in evidence emphasizes the importance, in jurisdictional determinations with hydric soils as an aid, of not merely determining whether the soil in question is hydric, but also of investigating the specific characteristics of the soil profile, which the Department maintains must be performed by a soils scientist. Mr. Carlisle, a soil scientist, visited the site and took samples of the areas indicated by Mr. Garlick. These locations were located in an approximate fashion by Mr. Garlick on Petitioner's Exhibit 8 at the hearing. Thirty-four of the 35 samples taken were determined to be hydiric by Dr. Carlisle. There are, however, breaks of up to approximately 525 feet between the hydric soils test findings in Areas A, B and D and yet the distance between one hydric and non-hydric soil test finding was shown to be approximately 50 feet. No soil samples were taken by Dr. Carlisle in Area C. These samples are found to provide an insufficient basis for determining the presence of hydric soils throughout Areas A-D. Additionally, Areas A-D did not contain areas of "b test" vegetation contiguous to other jurisdictional areas. Therefore, even if hydric soils had been present throughout these areas, these soils standing alone, without supporting "b test" vegetation, are insufficient to establish jurisdiction in the areas maintained to be so by Mr. Garlick. General Wetland Impacts This project will impact wetlands subject to the DER jurisdiction and which are jurisdictional for MSSW purposes under Chapter 40C-4, Florida Administrative Code, the rules of the St. Johns River Water Management District. Thus, a dredge and fill permit is required pursuant to Section 403.91 et seq., Florida Statutes, and DER Rule 17-312, Florida Administrative Code. Areas subject to DER dredge and fill jurisdiction and MSSW permitting jurisdiction are considered pursuant to DER Rules 17- 301 and 40C-4, Florida Administrative Code. The 1,288 acre site contains approximately 550 acres of wetland, much of which contains planted pines as well as some naturally occurring pines, as well as hardwood swamp, cypress and gum swamp, seepage slope, ditches and swales. Virtually all of the wetlands have been adversely affected in some way by the forestry practices which have occurred and are still occurring on the site. Most of the sloughs and natural flow-ways have been channelized. Ditching has drained the adjacent wetlands and significantly altered the hydrology of the entire wetland system on the site. The wetland known as Hells Bay Swamp, immediately east of the landfills, is currently being clear cut by the Gilman Paper Company. The 550 acres of wetlands are jurisdictional for either dredge and fill or MSSW purposes or both. Some 3.17 acres of MSSW wetlands will be impacted by project construction; 1.61 acres of these are also dredge and fill wetlands. The 1.61 acres of the impacted dredge and fill and MSSW wetlands consist of roadside ditches along the Hells Bay Road and a road on the north side of the Class I landfill. These roads are currently subject to logging traffic, which decreases the usage of the roadways and ditches by wildlife. Consequently, the master of species present and using these ditches is limited. In addition to the 1.61 acres of ditches, the impacted MSSW wetlands also include 0.16 acres of wetland ditches along the entrance road in proximity to dredge and fill wetlands, a 0.80 acre isolated cypress head wetland located within the footprint of the Class I landfill and a 0.60 acre wetland located along West Fiftone Road extending into the south border of the Class I landfill footprint. The 0.80 acre cypress head has already been impacted by a logging road or fire break, and ditches have been constructed through the interior of it. The larger cypresses have been logged, and the remaining vegetation is sparse, rendering it of little quality as habitat for fish and wildlife. The 0.60 acre wetland extending into the south border of the Class I landfill is an old road bed with evidence of ruts from vehicular traffic depicted on photographs in evidence. This area has a slash pine canopy and is dominated by titi shrubs, with a few black gum and traditional wetland plant species such as fetter bush and gallberry in disconnected areas. It is a low quality wetland of scant value as habitat for fish or wildlife. Prior to and during construction, as a condition on a grant of the permits, all wetlands on the site will be protected from erosion, siltation, scouring or excessive deposition of turbidity, de-watering or other construction and operationally-related impacts by the installation and use of siltation barriers placed at wetland boundaries. Because of the significant possibility of the impacts mentioned above, especially siltation and turbidity, to the wetlands during the construction phase of the facilities and attendant to ultimate operation of the landfill itself, grant of the permit should be conditioned on acceptance of monthly inspections by DER enforcement personnel once construction has begun. Wildlife and Archaeological Resource Impacts Wildlife surveys were conducted by expert witness Isaac Rhodes Robinson and members of his staff, as well as by Biological Research Associates, Inc. in the months preceding the hearing. Mr. Robinson and the biologists on his staff spent approximately 1,000 man hours surveying the site, and Mr. Robinson, accepted as an expert in wildlife ecology and wetland ecology, testified on behalf of the Applicant in this proceeding. Assessments of the site were performed by reviewing relevant literature as well as conducting field surveys for both upland and wetland species. No evidence was found of any threatened or endangered species on the site. Mr. Robinson and his staff conducted surveys in 1990 and in early 1991 and biologists from Mr. Robinson's staff were present on the site at various times from September 1989 through the time of the hearing. Surveys performed by Mr. Robinson and his personnel were conducted in accordance with Florida Game and Fresh Water Fish Commission (FGFWFC) guidelines and exceeded that agency's guidelines by surveying 100 percent of the upland areas. No testimony of any witness in this proceeding indicated any physical evidence of use of the site by any endangered or threatened species. Wildlife surveys revealed a shall colony of gopher tortoises, listed as a species of special concern by the FGFWFC in a marginal habitat zone on the extreme western boundary of the Class I disposal area. The colony consists of less than ten individuals and there will not be a significant impact to the tortoises because the individuals will be trapped and relocated to a more suitable habitat on another area of he Applicant's tract, which will be undisturbed by the landfill or its operations, or else to a suitable habitat area off-site, as directed by the FGFWFC. Jay Stephen Godley was accepted as an expert in wildlife ecology and wetlands ecology. He directed an independent assessment of the site and project's impacts. The assessment included reviewing permitting documents, aerial photographs and literature pertaining to wildlife use of the site, as well as over 90 man hours spent at the site. He confirmed that the small population of gopher tortoises was the only significant species on the site and that the project would not significantly impact any listed wildlife species. Extensive trapping and investigation of gopher tortoise and armadillo burrows reveal no evidence of listed "commensal" species, or those species commonly found in association with gopher tortoises, such as Florida mice, gopher frogs, Florida pine snakes, or Eastern indigo snakes. In additions the isolated cypress head in the Class I landfill footprint was sampled for gopher frog tadpoles, and none were found. Florida pine snakes prefer scrub or sand hill habitats, neither of which are found on the site. Pine flatwoods environments, without the presence of either sand hill or scrub habitat, like this site, are not good indigo snake habitat. No indigo snakes' shed skins or other evidence of indigo snake frequency were observed on the site. Indigo snakes are large black snakes which are active during daylight hours and easy to observe in the course of extensive surveys such as those that were conducted for purposes of this project. Considering the amount of time spent by the various biologists on the site, it is quite likely that indigo snakes would have been observed if they frequented this site. The project will have no significant impact on wading birds. All wetlands were surveyed for listed bird species for a minimum of five days using FGFWFC guidelines. No wading birds were observed on the site during the 21 month period of review by Mr. Robinson's firm. The existence of the wood stork, bald eagle or Florida sand hill crane was not established on this site and is considered unlikely by the expert witnesses, whose opinions are accepted. No eagle nests were observed and, since the tree cover provides very limited extent of open water, the site is less than satisfactory as habitat for the little blue heron, snowy egret and Louisiana heron. The only wading bird observed by the Petitioner's expert witness on wildlife issues was a little blue heron observed in a wetland area east of the site, which is off the site being purchased by the Applicant and which was recently clear-cut by the Gilman Paper Company. The project will have no significant adverse impact on the Florida black bear's habitat. The black bear is a threatened species, but black bears do not use the site. No evidence was presented that black bears have ever been present on or in the immediate vicinity of the site. No witness, including Mr. Goodowns, an employee of Gilman Paper Company who has frequently visited and worked on this site over many years, has ever observed a black bear or any sign of a black bear present on the site. Bee hives have been kept at the site since at least 1969 and, although these are very attractive to black bears, they have never been known to have disturbed the hives, nor has it ever been necessary for bee keepers to erect electric fences or other devices to protect the hives from bears. The site presently is not far isolated from human activity, which fact deters the use of it as a habitat or an occasional travel way for black bears. It is located in an area completely enclosed by I-10, State Roads 228 and U.S. Highway 301, all heavily traveled public highways, as well as in close proximity to the town of Maxville, approximately two miles away, and Macclenny, approximately five miles away. Highways with high traffic volumes are significant barriers to movements of black bears, rendering it even less likely that black bears have or will frequent the site. The only evidence of potential black bear presence anywhere near the site presented by the Petitioners was the site's position near the Osceola Black Bear Range, as interpreted from one published article, as well as indication of three bear road kills from six to 15 miles away from the site, and supposed black bear movements recorded by the FGFWFC, all represented on a hand-drawn map, only admitted a corroborative hearsay pursuant to Section 120.58, Florida Statutes. The map exhibit contained the expert's own redrawing of his interpretation of the extent of the Osceola Black Bear Range from the article he referenced, which itself was not offered into evidence. Bear movements depicted on the map really consisted of those of a bear apprehended by the FGFWF and released in the area. The map did not show any roads, therefore making location and distances to the reported road kills speculative at best. Because black bears do not use this site and because of its encirclement by significant human activity, the site is not significant as a bear dispersal corridor or travelway between the Osceola Forest bear population and the Ocala Forest population. No direct evidence by radio-telemetry data or otherwise was offered to show that black bears actually move between the Osceola and Ocala Forest populations, nor particularly that they move through the area in the immediate vicinity of the project site. Construction of the landfill would not prevent the movement or foraging of black bears through the site. Neither fencing nor presence of traffic on the landfill access roads only during daylight hours would prevent such movement. It is also unlikely that bears would likely be hit by traffic on the roads because the noisy trucks which will use the road would provide ample warning to bear's of any danger from traffic so they would avoid it. If the landfill were constructed on this site, less than one-half of 5/100 of one percent of the 3,800 square- mile area of the Osceola Black Bear Range, referenced by the Petitioners' expert witness, would be impacted. The site itself does not provide high quality black bear' foraging or denning habitat. Even the Petitioners' expert characterized it as "good" or "better than average" habitat. All but 3.17 acres of the area to be impacted by the project is upland, consisting primarily of pine flatwoods. Authoritative studies show that flatwoods are not heavily utilized by bears, which spend 70 percent of their time in swamp or wetland habitat. The 550 acres of wetlands, including approximately 280 acres of swamps, which will be left undisturbed on the site, will provide habitat and travel corridors for the black bears should any ever frequent the site. Additionally, the 4.76 acres of hardwood wetlands to be created as mitigation, would add high quality wetland habitat for black bears. Therefore, due to the extremely small area involved, the unlikelihood of use by black bears and the mitigation proposed, the landfill will have virtually no impact on black bear habitat, travelways or populations. The evidence thus established that the project will not have an adverse impact on endangered or threatened species or their habitats. Because the site has been under extensive commercial forest management and harvest operations for over forty years, the density of plant and animal life has been reduced, thus making the site as a whole, low quality wildlife habitat.
Recommendation Having considered the foregoing Findings of Fact, Conclusions of Law, the evidence of record, the candor and demeanor of the witnesses and the pleadings and arguments of the parties, it is, therefore RECOMMENDED: That a Final Order be entered by the Department of Environmental Regulation approving Trail Ridge Landfill, Inc.'s applications for the above-referenced permits for the proposed solid waste management facility, including a solid waste management facility permit, a storm water/management and storage of surface waters permit and a dredge and fill permit, provided those mandatory conditions specified in the Notices of Intent to issue such permits, as well as those conditions found to be necessary in the above Findings of Fact and Conclusions of Law are made mandatory conditions of permitting and subsequent facility operations. DONE AND ENTERED this 20th day of September, 1991, in Tallahassee, Leon County, Florida. P. MICHAEL RUFF Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 20th day of September 1991.
The Issue The issue presented here concerns the entitlement of the Petitioner, Turtle Lake Land Trust, to be permitted by the Respondent, State of Florida, Department of Environmental Regulation, to dredge approximately 600,000 cubic yards of material in the area known as Turtle Lake, which is located near Jackson street and Fairfield Drive, Pensacola, Florida. The purpose of this project is to create a manmade lake. The dredged material world be placed on the lake shore.
Findings Of Fact On May 9, 1979, the Respondent, State of Florida, Department of Environmental Regulation, received an environmental permit application from the Petitioner, Turtle Lake Land Trust. The details of that permit application were contained in a form provided by the Department together with attachments to that form. A copy of this permit application may be found as the Respondent's Exhibit No. 2 admitted into evidence. By this application, Turtle Lake requested that it be allowed to dredge approximately 600,000 cubic yards of material in an area known as Turtle Lake, which is located near Jackson Street and Fairfield Drive, Pensacola, Florida. The purpose of the excavation was to establish a manmade lake approximately twelve (12) feet in depth in an area which is a cypress swamp and subject to periodic inundation by water. The materials removed from the dredging would be deposited on the shores of the lake, effectively raising the ground elevation at lakeside. The dredging would intersect the groundwater on the project site. The project is part of an overall development which would involve construction of residential housing and commercial facilities in the vicinity of the lake, with the lake to be used for fishing, sailing and other water recreation. The proposal of the Petitioner was reviewed by the Department and certain timely additional requests were made from the Department to the applicant to provide information necessary to evaluate the request for permit. The exhibits dealing with the request for additional information and responses to those requests may be found as Respondent's Exhibits 3, 5, 8, 9, 10 and 11 admitted into evidence. The Department solicited comments from the Florida Game and Freshwater Fish Commission on this subject and the comments were provided by correspondence from the Executive Director of the Commission. These comments may be found in Respondent's Exhibit No. 6 admitted into evidence, which is a copy of those remarks. The Department of Environmental Regulation, in keeping with the provision Subsection 253.124(3), Florida Statutes, performed a biological survey of the project site and submitted it to the Board of County Commissioners of Escambia County, Florida, for the Board's action. A copy of the survey may be found as Respondent's Exhibit No. 7 admitted into evidence. The Escambia County Board of County Commissioners, by Resolution dated October 11, 1979, approved the project subject to action by the Respondent and the United States Corps of Engineers. A copy of this Resolution may be found as the Respondent's Exhibit No. 12 admitted into evidence. Upon consideration of the permit request, the Department of Environmental Regulation notified the applicant of its intent to deny the permit request. This Letter of Intent to Deny was issued on January 31, 1980, and a copy of it may be found as Respondent's Exhibit No. 13 admitted into evidence. This matter has been presented for consideration before the State of Florida, Division of Administrative Hearings, upon referral by the Respondent of the original Petition and has been heard after opportunity for and amendment to that Petition. The hearing was conducted on September 23, 1980, as scheduled, in keeping with the provisions of Subsection 120.57(1), Florida Statutes. The project site is located in a cypress swamp which has also been referred to as a cypress head. The southern boundary of the project site east of Fairfield Drive has an impoundment area which is fringed by pine trees and other upland species, to include gallberry, southern brackin, blackberry and oak. There is within this area aquatic vegetation dominated by Eleocharis sp. and fragrant waterlily (nymphaea odorata). The cypress head itself, which is bounded on the west by Fairfield Drive, consists of cypress, blackgum, sweetbay and cinnamon fern, fragrant waterlily and pickerel weed (pontederia lanceolata). Within the zone of the cypress head standing water may be found, the dimensions and depths of which were not established at the hearing in sufficient detail to allow further comment in these findings. Fairfield Drive serves to contain the water found in the Turtle Lake swamp on the eastern side of that roadway; however, there is an exit from the cypress head under Fairfield Drive by a series of three 24-inch culverts which connect the manmade ditches. These ditches flow into Bayou Marcus and Bayou Marcus Creek and eventually into Perdido Bay. This water connection is a direct connection and Bayou Marcus, Bayou Marcus Creek and Perdido Bay are waters of the State. Immediately adjacent to Fairfield Drive east of that roadway in the vicinity the culverts water may be found standing and could be navigated and this may be seen by Respondent's Composite Exhibit No. 14. This water which although subject to navigation wad not identified sufficiently at the hearing to establish its length and breadth. The depth was two to three feet. This water adjacent to Fairfield Drive is not within that area of the proposed excavation. At present, the storm water runoff from the Forte subdivision located to the north and east of the project site, enters the cypress head swamp and at times of periodic inundation, this storm water runoff arrives at the area of the culverts into the ditch system and into Bayou Marcus, Bayou Marcus Creek and Perdido Bay. The oils and greases, fertilizers, pesticides, nutrients and other forms of pollutants which make up the storm water constituents are somewhat filtered by the cypress head swamp as it now exists, prior to the entry of those materials into the culvert area adjacent to Fairfield Drive and from there into the transport mechanism constituted of the ditches, bayou, creek and bay. If the project is built out, the dredging will remove those flora mentioned herein and the fauna which inhabit this swamp and will remove the cypress head from future use by the fauna which normally inhabit this form of environment. It would also take away the natural filtration to be provided by the swamp in the way of removing undesirable storm water constituents from the residential runoff in Forte subdivision and the proposed development associated with the lake construction. The removal of the swamp would destroy the capacity to convert raw nutrients into usable sources of food for indigenous dawn stream organisms. As can be seen in the Petitioner's Exhibit No. 1, the existing water table at the site is approximately 23 feet and ordinary highwater elevation has been measured at 24 feet with an existing grade of 21 feet. If the lake were excavated, the lake would show a water table with an elevation of 20 feet. The berm or dykes around the lake would have an elevation of 24 feet. Storm water from the current subdivision and the residential and commercial build-out associated with the project in question would be carried through underground storm water piping into four holding areas which have been referred to by the applicant as drainage corridors and retention area. These areas are separated from the lake by siltation screens and will serve the function of filtering out some storm water constituents which are solid particulates. The constituents which have been dissolved will flow through the siltation screen devices and into the lake proper. When the lake rises to a depth of 23 feet, the excess water will he transported through a proposed ditch into the area of the three culverts under Fairfield Drive and via those manmade conveyances into Bayou Marcus, Bayou Marcus Creek and Perdido Bay. Those storm water constituents such as oils and greases, fertilizers, pesticides, nutrients and other forms of pollutants which have not settled or been filtered will be transported through this system and deposited into waters of the State. In this connection, the drainage corridor and retention areas are not designed for long-term retention; they are primarily for short-term detention, depending on the amount of loading from the storm water runoff. The only pre-treatment associated with the storm water runoff is that filtration that occurs in the drainage corridor and retention area. (There was some discussion of possible gravel filters in conjunction with the drainage corridor and retention area but they were not part of the plan submitted to the Department in the process of project review.) In addition to the introduction of the storm water contaminants into the waters adjacent to Fairfield Drive at the area of the culverts and the bayou, creek and bay, these contaminants will be introduced into the ground water in the lake proper Although some increase in retention of storm water runoff may be expected, if the project were built, there would be a significant increase in the introduction of dissolved contaminants into waters over which the Respondent has jurisdiction, i.e., Bayou Marcus, Bayou Marcus Creek and Perdido Bay. Increases in these areas will occur in biochemical oxygen demand and undesirable nutrient and dissolved oxygen levels will decrease if this project is constructed. In association with this change, an increase in nuisance species would occur. The Petitioner has failed to do any background sampling to establish the natural background levels of the aforementioned conditions in waters of the State in order to identify whether water quality in the receiving waters would be degraded from existing conditions to the extent of violating the Department's water quality criteria.
Recommendation Based upon a full consideration of the facts as presented and the Conclusions of Law reached in this matter, it is RECOMMENDED that the Secretary of the State of Florida, Department of Environmental Regulation, deny the Petitioner a dredge and fill permit pursuant to Rule 17-4.28, Florida Administrative Code; a construction, operating and maintenance permit pursuant to Section 403.087, Florida Statutes; a ground water permit in accordance with Rules 17-3.071, Florida Administrative Code, and 17- 4.245, Florida Administrative Code; and be it further RECOMMENDED that the Secretary take no further action to require a permit(s) as might be indicated in keeping with Chapter 253, Florida statutes. 1/ DONE AND ENTERED this 22nd day of October, 1980, in Tallahassee, Florida. CHARLES C. ADAMS Hearing Officer Division of Administrative Hearings The Collins Building Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 22nd day of October, 1980.
Findings Of Fact The Navy intends to construct a 160 unit residential housing project at Key West, Florida. This project will be built on a 25.89 acre site that is bordered on the north by Eaton Street and Palm Avenue, on the east by Eisenhower Drive, on the south by Angela Street, and on the west by White Street. As designed, the completed site will have approximately 58 percent pervious area and 42 percent impervious area. In its undeveloped state, storm water runoff for the Peary Court site sheetflows to the north where a concrete containment wall directs the runoff to an existing inlet and storm drain. This existing inlet and drain connects to the City of Key West's drainage system at the corner of Palm Avenue and Eisenhower Drive and eventually discharges into a nearby surface water body known as "Garrison Bight". Runoff capacity that cannot be managed by the City of Key West's drainage system collects and discharges onto Palm Avenue. On September 21, 1992, the Navy submitted its initial permit application to the Department for the issuance of seven Class V storm water injection well permits. The seven injection wells are designed to function as part of a surface water management system. The storm water management system must be permitted by the South Florida Water Management District (SFWMD). The injection wells must be permitted by the Department. The proposed surface water management system for Peary Court was designed to meet SFWMD permitting criteria and will utilize dry detention with filtration through grassy swales and grassy retention ponds for the pretreatment of the project's storm water runoff. The Navy applied to SFWMD for a permit for the proposed surface water management system. The SFWMD tentatively approved the application. Thereafter, a challenge was filed to the proposed agency action, and the matter was referred to the Division of Administrative Hearings and assigned DOAH Case No. 92-6254. A Recommended Order was entered in DOAH Case NO. 92-6254 which recommended that the surface water management system be approved. A Final Order has been entered in DOAH Case 92-6254 by the SFWMD approving the Navy's surface water management system permit for Peary Court. The period for appeals of the Final Order has not expired as of the entry of this Recommended Order. The Department gave notice on December 4, 1992, of its intent to issue the permits to the Navy for not more than seven injection wells to be operated as part of the Peary Court surface water management system. The permit the Department intends to issue contains 16 general conditions and 10 specific conditions. None of the conditions are being challenged by the Navy. Among the specific conditions are the following: This permit is valid only for the specific process and operation indicated in the application. Any changes in these which may result in altered characteristics of the discharge are not permitted without the prior approval of the Department and modification of this permit. The discharge authorized by this permit shall be consistent with the water quality standards set forth in Chapter 17-3, F.A.C. [S]hould conditions in the receiving body warrant, the Permittee may be required by the Department to upgrade, reduce or cease discharge of run-off approved by this permit, and adopt an alternative method of disposal within a reasonable time. The permittee shall establish a periodic maintenance program that assures the integrity of the storm water drainage system to function as designed. "Detention" as that term is used in the context of surface water management systems is the temporary detaining of water on a site prior to eventual offsite discharge. "Retention" is the permanent retaining of water on a site with no offsite discharge. The proposed surface water management system will utilize grassy inlets and swales to direct runoff into four large grassy detention ponds as well as smaller pond areas prior to discharge from the surface water management system. Storm water that does not evaporate or percolate into the ground will be discharged through a v-notch weir discharge structure into Garrison Bight or to ground waters via the proposed injection wells. The detention ponds are connected with one another and act as one system so that the ponds fill and empty at the same rate. The surface water management system for Peary Court is designed so that there will be no offsite discharge during the first inch of a rainfall event. The on-site detention of the first inch of rainfall results in the removal of approximately 90 percent of all pollutants prior to discharge through what is referred to as "first flush". With the exception of one cul-de-sac in the northeast corner of the project near the v-notch weir, all runoff draining into the proposed detention areas will flow through grassy swales and inlets. The proposed grassy inlets and swales will transport runoff to the grassy detention ponds at a rate of one quarter to one half inch per second and thus will provide adequate filtration for the storm water runoff before it gets to the detention pond. The storm water that comes from the cul-de-sac will include storm water from Palm Avenue, which is adjacent to the Peary Court site. This storm water will travel through at least 50 feet through pipe before entering the detention pond and will receive little filtration prior to entering the detention pond. The water from the cul-de-sac will receive some filtration in the detention pond. The system is designed to detain the amount of storm water runoff which would be expected from a twenty-five year, three day storm event. Such a storm event in Key West would be expected to represent roughly a six to seven inch rainfall. The proposed injection wells are Class V, Group 5 storm water drainage wells pursuant to Rule, 17-28.130(1)(e)5, Florida Administrative Code, and meet all pertinent construction standards. The proposed injection wells will be located on the north side of Peary Court. The exact location and number of injection wells to be utilized will be determined by data received from conducting a well capacity test after the installation of the first injection well. The pre-development runoff from Peary Court was 55 cubic feet per second (cfs). Pursuant to SFWMD permitting criteria, the post-development discharge cannot exceed the pre-development discharge. The discharge capacity from the v-notch weir into Garrison Bight is 11 cfs. Consequently, the maximum discharge from the injection wells will be 44 cfs. The proposed location and number of wells are based on conservative estimates. No allowance is made in the surface water management system for naturally occurring evaporation or percolation. Discharges down the proposed injection wells is not continuous and is only expected to occur during rare storm events. The bottom of the detention ponds will be set at elevation 1.0 NGVD. The water inlets for the injection wells will be set at elevation 1.5 NGVD. Because the proposed water inlet for the v-notch weir discharge structure will be set at elevation 1 NGVD, offsite discharge to Garrison Bight will begin through the v-notch weir before any discharge through the injection wells. Discharge of storm water down the proposed injection wells will only occur when water levels in the ponds reach six inches (0.5 NGVD). The proposed wells will be drilled to a depth of ninety feet with grouted steel casing extending down to a depth of sixty feet below land surface. The wells are to be grouted to ensure that there will be no vertical migration along the borehole. Each injection well will have a concrete wellhead with a built in baffle to prevent floating debris, silt or sand from entering the well. The baffle will not prevent contaminants that are suspended in the storm water from being discharged through the injection well. The Navy provided a bedrock assessment and groundwater quality profile by drilling two exploratory boreholes at Peary Court. The subsurface strata underlying Key West consists of distinct horizontal layers of Miami Oolite and Key Largo Limestone. Beneath Peary Court, Miami Oolite extends from ground surface down to between forty-seven and fifty feet below land surface. The Key Largo Limestone extends below the Miami Oolite formation. Key Largo Limestone consists mainly of coral and limestone and is generally more porous and more permeable than Miami Oolite. Miami Oolite consists mainly of small sand like particles cemented together. Both formations can contain clays and lime or silicate muds. The Miami Oolite layer is not considered by the Department to be a "confining layer" as that term is used in the Department's rules determining the classification of wells because of its limited ability to retard the flow of fluids. The injection zone for the proposed injection wells will be between 60 to 90 feet below land surface, which is in the Key Largo Limestone formation. Ground water in the injection zone contains 35,000 to 40,000 milligrams per liter (mg/l) of total dissolved solids (TDS). Ground water in the injection zone is classified under Department rules as G-III because it is ground water having more than 10,000 mg/l TDS. A freshwater lens (the Key West lens) underlies a portion of Key West. The United States Geological Survey (USGS) documented the water quality and approximate size of the lens in 1990 by analyzing water samples taken from shallow monitoring wells. The results were compiled into what is referred to as the McKenzie Report. This thin layer of freshwater, varying in depths from two to ten feet, sits on top of a transition zone between the seawater and freshwater. This transition extends downward to approximately 40 feet below the surface of the land. The freshwater lens does not underlie Peary Court. The Key West lens is classified under Department rules as G-II because it is ground water having less than 10,000 mg/l TDS. The McKenzie Report documents the size of the lens using chloride concentration contours, with 250 mg/l chloride at the center of the lens out to 5,000 mg/l at the edge of the lens. Chloride concentrations of 250 mg/l or less is the standard maximum chloride level for drinking water. The locations of the proposed injection wells are outside of the 5,000 mg/l chloride concentration contour. There is no potable water source in the immediate vicinity of the proposed wells. The proposed injection wells will not be installed through G-II ground water (Key West lens), nor will it inject storm water into G-II ground water. Movement of water in the injection zone will be governed by two forces, pressure gradients and buoyancy factors. The injected water is more buoyant than sea water because it is less dense. Consequently, there will be a tendency for the injected water to move upward. The injected water also moves outward along pressure gradients associated with the Key West lens. The Key West Lens is thicker in the center and thinner towards the sides. Because of this fact, it has varying pressure gradients which is greater toward the center and will cause the injected water to move away from the Key West Lens. It is an established geologic principle that subsurface sedimentary rock formations generally favor lateral movement of water over vertical movement. Because the Key Largo Limestone strata is more porous and more permeable than the Miami Oolite strata and because of the pressure gradients of the Key West Lens, the storm water injected through the injection wells will move laterally away from the Key West Lens and towards Florida Bay. Tidal action will contribute toward the movement of the injected storm water away from the Key West Lens. It is not expected that the injected storm water will reach the Key West lens. When the relative densities of the injected water and the ground water equalize, upward movement of the storm water will cease. Subsurface tidal flows will have a washing machine effect on the discharging storm waters that will enhance the mixing and dispersion of the storm water. The mixing and dispersion of the storm water caused by subsurface tidal flows serve to reduce the buoyancy of the storm water, which retards its upward movement. The Department has relied, in part, on the review by SFWMD of the surface water management system in reaching the conclusion that the storm water discharged through the wells will meet water quality criteria after having moved through the surface water management system. When the Navy first applied for the surface water management system permit, it was believed that Garrison Bight had been designated as an Outstanding Florida Water. Consequently, SFWMD required that the surface water management system be designed to meet discharge criteria applicable to Outstanding Florida Waters. Notwithstanding such design, it can still be expected that minute levels of various contaminants typically found in storm water, such as heavy metals and those contained in pesticides, petroleum products, and animal waste, will remain in the discharged storm water. Saline ground waters contain microorganisms which live off trace amounts of organic material. Highly active zones of microorganisms, such as those found around injection wells, feed on and effectively break down organic compounds, including petroleum constituents, which may be discharged from injection wells. Any heavy metals that may remain in the storm water when it is injected through the injection wells will likely be absorbed onto the minute clay particles present in the Key Largo Limestone and Miami Oolite. Other natural constituents found in ground water will precipitate phosphorus and will break down nitrates. The Department's review of the Navy's application included an analysis of the proposed injection well design, the geologic, hydrogeologic, and water quality data and test reports provided in the permit application, and certain geologic literature, including the McKenzie report and other studies. Because of the known existence of the Key West lens, the Department required the Navy to submit more water quality and geologic data than would normally be submitted for a Class V injection well. Rule 17-28.520, Florida Administrative Code, provides, in pertinent part, as follows: The variety of Class V wells and their uses dictate a variety of construction designs consistent with those uses, and precludes specific construction standards for each type of Class V well outlined in this rule. However, a well must be designed and constructed for its intended use, in accordance with good engineering practices, and the design and construction must be approved by the Department. Rule 17-28.530, Florida Administrative Code, provides, in pertinent part, as follows: All Class V wells shall be operated in such a manner that they do not present a hazard to an underground source of drinking water. ... Rule 17-28.620, Florida Administrative Code, provides, in pertinent part, as follows: All owners of operators of Class V wells shall obtain a two-part Construction/Clearance permit ... The applicant shall submit to the Department at least the following information before receiving permission to construct: * * * Well location and depth, and casing diameter and depth for all water supply wells on the applicant's property, and well location for all water supply wells of public record within a 1000 foot radius of the proposed well; Description and use of proposed injection system, including type and construction of injection wells, physical and chemical analyses, estimated quantity, pertinent bacteriological analyses of injected fluid, and any proposed pretreatment; Proposed drilling and testing plan for any exploratory borehole or exploratory well proposed for the purpose of determining feasibility of Class V well injection at the site; If the flow of surface or other waters is directed by ditches or other artificial methods to the well, a delineation of the area drained by these features shall be provided. Rule 17-28.610(2), Florida Administrative Code, prohibits the injection of contaminants into underground sources of drinking water where the contaminant may cause a violation of any primary drinking water regulations under Chapter 403, Florida Statutes, and Chapter 17-22, Florida Administrative Code, or where the contaminants may adversely affect the health of persons. The Navy has provided reasonable assurances that the injected storm water will have no effect on G-II groundwater, that the injected storm water will have little or no effect on the water quality of G-III groundwater, and that the injected storm water will not result in a violation of the minimum criteria and standards for G-II and G-III groundwater. Further, the Navy has provide reasonable assurances that the proposed injection wells will not cause or contribute to any adverse effects on public health. These findings are based, in part, on the design of the surface water management system, on the different permeability of the geologic formations that underlie Key West, the biological and chemical factors in the saline environment into which the storm water will be injected, and on the pressure gradients and other dynamics of the Key West Lens. Although there was some disagreement among the various expert witnesses who testified in this proceeding, the most persuasive testimony establishes that the water discharged through the injection wells will not reach the Key West lens and that the water will likely have no detectable levels of contaminants if it ever reaches Florida Bay.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department enter a final order issuing the requested permit for the injection wells with all conditions contained in the notice and intent to issue. DONE AND ORDERED this 30th day of June, 1993, in Tallahassee, Leon County, Florida. CLAUDE B. ARRINGTON Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 30th day of June, 1993.
The Issue The issue is whether Respondent Department of Environmental Protection properly determined that Respondent City of Gulf Breeze was entitled to construct a concrete jetty at the mouth of Gilmore Bayou, to widen the mouth of the bayou an additional 35 feet, and to dredge sections of the bayou to a depth of minus eight feet.
Findings Of Fact On March 22, 1996, Gulf Breeze applied for a wetlands resource permit from DEP to allow the following: (a) dredging of the entrance channel to Gilmore Bayou in order to return the channel to its original width and depth; (b) construction of bulkheads on either side of the channel; and (c) construction of two jetties on the east side of the channel to slow the accretion of sediments in the channel. The proposed project is located in the waters of the state at the southwestern end of Gilmore Bayou where it opens into Pensacola Bay. The project is adjacent to and north of 406 Navy Cove Road, in the City of Gulf Breeze, Florida, Section 6, Township 35N, Range 29W. The Petitioner's home is located at 86 Highpoint Drive, Gulf Breeze, Florida. Her residence is downstream from the project at the northeastern end of Gilmore Bayou. The channel at the southwestern end of Gilmore Bayou was originally dredged in the mid-1950s. Since that time, the channel has provided a navigable outlet to Pensacola Bay for use by property and boat owners along Gilmore Bayou. The channel has also provided for water circulation and tidal flushing within the Bayou. Maintenance dredging has been performed almost annually to keep the Gilmore Bayou channel open. The purpose of the proposed project is to reduce the need for the frequent maintenance dredging and to provide for better water circulation in the bayou. A wetlands resource permit to perform maintenance dredging has not been required in the past because that activity was exempt from the permitting process. On July 28, 1997, the Department issued Gulf Breeze a Notice of Intent to Issue Draft Permit Number 572874961 to construct one seventy (70) foot long concrete jetty at the mouth of Gilmore Bayou, widen the mouth of Gilmore Bayou an additional thirty-five feet and dredge sections of the Bayou to a depth of minus eight feet. In issuing the Notice of Intent to Issue, the Department also considered Gulf Breeze's application for a five- year sovereign, submerged land easement for the location of the jetty. Gulf Breeze published the Notice of Intent to Issue in a newspaper of general circulation in accordance with DEP requirements and Section 373.413(4), Florida Statutes, and Rule 62-343.090(2)(k), Florida Administrative Code. Thereafter, Petitioner filed a petition requesting that the permit be denied. Petitioner has a substantial interest in the permitted activity, as she owns property and resides on Gilmore Bayou. Petitioner's request that the permit be denied is primarily based on her opinion that water quality in Gilmore Bayou has deteriorated as a result of the original and continuous dredging of the channel at the southwestern end of Gilmore Bayou. She is concerned that the permitted activity will result in further water quality degradation and result in a further movement of the spit of land which extends in front of her home out to Deadman's Island on the northern side of the Bayou. The ecosystem in Gilmore Bayou today is a healthy system which supports various marshes and fish. The ecosystem thrives despite water quality degradation resulting from development and urbanization along its shores. More specifically, septic tanks, fertilizer runoff, and stormwater discharge have caused water quality to degrade in the Bayou. The most persuasive evidence indicates that the dredging of the channel over time has not caused the water quality to degrade. The permitted activity will have a positive effect on water quality in Gilmore Bayou, as it will enhance tidal flushing through the channel. The jetty, which is a part of the permitted activity, will slow the transport of sand into the channel, allowing for better flushing and reducing the need for maintenance dredging in the channel. Construction of the jetty is recommended and supported by the hyrdographic study of Kenneth L. Echternacht, Ph.D., P.E. Gulf Breeze obtained and submitted this study to DEP to assist in evaluating the project. The permitted activity will have no significant impact on the location of the spit of land extending from Petitioner's property to Deadman's Island. The shifting of the spit of land over the years has been caused by numerous factors which are identified in a 1993 study by Dr. James P. Morgan, Ph.D. These factors include development of the area, erosion of the surrounding bluffs, the location of the Pensacola Bay bridge, and storms and sand drift into channels to the east of the spit. Without this project or frequent maintenance dredging, the channel at the southwestern end of Gilmore Bayou would fill with silt. Eventually, the silt would inhibit water circulation and result in further water quality degradation in the bayou. The permitted activity is not contrary to the public interest. Instead, it will benefit the public interest. The project will make it possible to maintain the Gilmore Bayou channel more efficiently. The project will allow for increased flushing of the bayou. The increased flushing will improve water quality in the bayou. The permitted activity will not have any adverse effect on the conservation of fish or wildlife, or any endangered species or their habitats. The permitted activity will not adversely affect navigation or flow of water or cause any harmful erosion or shoaling. It will have a positive effect on navigation and water flow and act to prevent harmful erosion or shoaling. The permitted activity will have no adverse effect on fishing or recreational values or marine productivity in the vicinity of the project. The permitted activity will provide for permanent jetties and bulkheads at the entrance to Gilmore Bayou. The permitted activity will have no adverse effect on historical or archeological resources on Deadman's Island or in the vicinity of the project. The permitted activity will have a positive impact on the recreational functions and use of the channel and Deadman's Island.
Recommendation Based upon the findings of fact and conclusions of law, it is, RECOMMENDED: That the Department of Environmental Protection issue a Final Order determining that its Notice of Intent to Issue Permit, together with Permit No. 572874961, is final agency action. DONE AND ENTERED this 6th day of February, 1998, in Tallahassee, Leon County, Florida. SUZANNE F. HOOD Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 Filed with the Clerk of the Division of Administrative Hearings this 6th day of February, 1998. COPIES FURNISHED: Mary Jane Thies, Esquire Beggs and Lane Post Office Box 12950 Pensacola, Florida 32576-2950 Ricardo Muratti, Esquire Department of Environmental Protection Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 Patricia J. Moreland 86 Highpoint Drive Gulf Breeze, Florida 32561 Matt E. Dannheisser, Esquire 504 North Baylen Street Pensacola, Florida 32501 Kathy Carter, Agency Clerk Department of Environmental Protection Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 F. Perry Odom, Esquire Department of Environmental Protection Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 Virginia B. Wetherell, Secretary Department of Environmental Protection Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000
Findings Of Fact On October 16, 1992, Dawson filed an application for a permit to demuck and fill approximately 1250 square feet, and grade and sod to natural elevation approximately 3000 square feet of previously impacted wetlands adjacent to an unnamed tributary of Wills Branch, Duval County, in order to construct a pad for the construction of a single family residence. The site is Lot 34 of Hammond Forest Subdivision. The loss of wetland function was mitigated by Dawson which agreed to place two acres of wetlands adjoining Ortega River in a conservation easement to the Department. Following a review of Dawson's application, the Department issued permit # 162205542, and gave notice to the adjacent property owners, including Petitioner, who timely requested a formal hearing. Hammond Forest Subdivision consist of 45 residential lots which have been developed except for two lots, one of which is lot 34, the site of the proposed permit. The Wills Branch drainage basin runs generally north to south through the subdivision. Petitioner's lot, lot 33, and the proposed site, lot 34, are at the southernmost edge of the subdivision and adjacent to a pond which is terminus of the southerly flow of surface waters into the Wills Branch system. In October 1993, the Petitioner's home was flooded by surface water run off from the area north of Petitioner's home, including areas within and outside the Hammond Forest Subdivision. Property owners living on the northern most portion of the subdivision have drainage problems, and have experienced sheet flow of water south across their property and water damage to their driveways. In order to alleviate this problem, Dawson constructed a shallow swale along the northern border of the subdivision which is intended to catch the southerly flow of surface water and divert the water to the east where it is captured in a storm drain located at the northeast corner of lot 17. The storm sewer is suppose to move the water below ground due south to the vicinity of Hammond Forest Drive, the principle street in the subdivision, which runs west to east in front of the proposed site and the Petitioner's lot. At the street, this storm sewer is connected to the storm water collectors for the street. The street storm sewers in the vicinity of the proposed site are inadequate to handle the volume of water which runs south down the cul-de-sacs into Hammond Forest Drive. The storm sewer are unable to handle the run off, and the water backs up in the sewer all the way to the northern collector located at the western end of the shallow swale. The owner of lot 17 experiences sheet flow of storm water over his property, and down his drive. From there, the water follows Quail Walk south to Hammond Forest. The property owners on the most easterly cul-de-sac, which is an extension of Hammond Forest, experience similar sheet flows of water. This water flows south down Hammond Forest towards the proposed site and the Petitioner's lot. The surface water flow down Hammond Forest meets the flow from Quail Walk immediately across from the proposed site and the Petitioner's lot. At this point the overloaded storm sewers cannot handle the merging flow of the northern storm drain and the water collected on the lots and streets to the north. The water backs up and collects at the collector located between the proposed site and the Petitioner's lot where the swirling caused by the drain forces the water over and down the Petitioner's driveway. During the record setting October 1993 rains, the water flooded the Petitioner's house. The water was so deep it was literally running in the front door and out the back door. Subsequent to the October 1993 flood, Petitioner's contractor installed a lateral driveway drain. Since this drain was installed, there has not been a rain comparable to the October 1993 rains; however, in a serious storm after the drain was installed, the waters surged into the Petitioner's driveway and flooded his garage. The proposed site is no higher than Petitioner's lot. The storm water drainage system for the subdivision was approved by the St. John's Water Management District prior to construction of the subdivision which preceded the application for the instant permit. The collector at lot 17 was added after construction of the other storm sewers which were not designed to accept this added volume of water. Expert testimony was received that the problem with the storm drains and sewers resulted from the absorption factor applied to the property which is upland from the subdivision which was unduly optimistic. Although the system was designed to be over minimum capacity, it is insufficient to handle the actual volume of water. A storm sewer runs from the collection grate between lots 33 and 34 to the collection pond along a easement between the aforementioned lots. The size of this storm sewer is inadequate, and the collection of water in the vicinity of the collector between the proposed site and the Petitioner's lot would be alleviated by increasing the size of this sewer pipe which runs the depth of and adjacent to the proposed site. The majority of this easement lies in an area regulated by the Department, and repairs to the drain would require the Department's approval for dredge and fill. The flow of surface storm water over Petitioner's lot is directly south into the collection pond. The developer plans to avoid flooding problems on the proposed site by raising the building pad's elevation a half foot; however, this will not prevent sheet water flow over the lot during storms given the elevations on the remainder of lot 34 which are identical to those on Petitioner's lot. The development of lot 34, which is currently is in a natural state, will alter the flow of water through the Wills Branch drainage basin by eliminating the natural vegetation and by allowing additional sheet flow over the developed lot into the collection pond. This water will carry into the pond lawn chemicals, fertilizers and other contaminates which it picks up as it travels over lot 34. A swale exists along the western edge of the Petitioner's property which prevents the lateral, east-west, movement of water between lots 33 and 34. A similar swale will be constructed between the two lots after lot 34 is filled and re-graded.
Recommendation Based upon the consideration of the facts found and the conclusions of law reached, it is, RECOMMENDED: That Permit No. 162205542 be denied, or conditioned by requiring the applicant to increase the size of the sewer pipe between lots 33 and 34 to eliminate the reoccurring flooding and sheet flows of water over lot 33 and lot 34, as proposed to be developed. DONE and ENTERED this 30th day of June, 1994, in Tallahassee, Florida. STEPHEN F. DEAN, Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 30th day of June, 1994. APPENDIX A CASE NO. 93-7175 Both of the Respondents submitted proposed findings which were read and considered. The following states which of those findings were adopted, and which were rejected and why: Dawson's Proposed Findings Recommended Order Paragraph 1 Paragraph 1 Paragraph 2 Paragraph 15 Paragraph 3 Paragraph 5 Paragraph 4,5 Paragraph 13 Paragraph 6,7 Contrary to best evidence DEP's Proposed Findings Recommended Order Paragraph 1 Paragraph 1,2 Paragraph 2 Paragraph 4 Paragraph 3 Paragraph 3 Paragraph 4 Paragraph 5 Paragraph 5,6 Preliminary Stmt Paragraph 7 Paragraph 15 Paragraph 8-11 Conclusions of Law Paragraph 12 Paragraph 22 Paragraph 13,14 Paragraph 5, subsumed in 5 Paragraph 15 Conclusions of Law Paragraph 16,17 Paragraph 22 Paragraph 18 Contrary to best evidence Paragraph 19 Conclusions of Law Paragraph 20,21 Contrary to best evidence COPIES FURNISHED: Gary R. Pedroni 8682 Hammond Forest Drive Jacksonville, FL 32221 Carl D. Dawson, Sr., Esquire 320 East Adams Street Jacksonville, FL 32202 Donna M. La Plante, Esquire Department of Environmental Protection 2600 Blair Stone Road Tallahassee, FL 32399-2400 Kenneth Plante, General Counsel Department of Environmental Protection 2600 Blair Stone Road Tallahassee, FL 32399-2400 Virginia B. Wetherell, Secretary Department of Environmental Protection 2600 Blair Stone Road Tallahassee, FL 32399-2400