RICHARD R. MONGIOVE vs CONSTRUCTION INDUSTRY LICENSING BOARD, 94-001766 (1994)
Division of Administrative Hearings, Florida Filed:Orlando, Florida Apr. 04, 1994 Number: 94-001766 Latest Update: Feb. 16, 1995

The Issue The issue is whether Respondent should deny Petitioner the right to take the state air conditioning contractor examination for lack of good moral character.

Findings Of Fact The National Assessment Institute ("NAI") provides examinations to the State Construction Industry Licensing Board, including the examination given for certification as a state air conditioning contractor. Petitioner has unsuccessfully taken the state air conditioning contractor examination approximately four times in the past. Petitioner has reviewed previous examinations and is familiar with procedures imposed pursuant to Section 455.229(2), Florida Statutes. No part of the examination may be copied, including any part of the questions or answers. Loose-leaf student manuals purchased from NAI may be taken into a review and retained by the student after the review is completed. Scratch paper provided by NAI officials during a review must be turned in at the conclusion of the review. On April 23, 1993, Petitioner reviewed a recent state air conditioning contractor examination. Petitioner reviewed the examination at a branch office of the NAI. Prior to April 23, 1993, Petitioner purchased a student manual. Petitioner placed one piece of carbon paper over one piece of blank paper and inserted the carbon set between two pages of the student manual. Petitioner taped closed the two pages of the student manual and tabbed the taped pages of the student manual ("altered pages"). Petitioner inserted three more carbon sets inside the student manual in identical fashion, producing a total of four altered pages. During the examination review on April 23, 1993, Petitioner placed a blank sheet of scratch paper on top of the first altered page of the student manual. Petitioner wrote the answers to the first part of the examination on the scratch paper. The answers were copied on the carbon set underneath the scratch paper. In a similar manner, Petitioner copied answers to each of the remaining three parts of the examination on the carbon sets inside each of the remaining altered pages in the student manual. Petitioner used a numeric code of "1-4" to represent answers "a-d" on each part of the examination. Petitioner used arithmetic symbols and other lines to disguise his effort by making it appear he was writing down mathematical formulas. However, the sequence of numbers "1-4" correspond to the correct answers "a-d" for each part of the examination reviewed. Petitioner copied 200 examination answers. During his testimony at the formal hearing, Petitioner explained: I did do something wrong. Transcript at 47. What I was trying to do was take down all the different letters. . . . I wanted to see if there was some kind of sequence where there were more A's, B's, more C's or more D's used. Transcript at 49. I was desperate. My whole life is air conditioning and refrigeration. * * * I've been trying to pass that test for at least the last two years, maybe more. . . . I believe it's been at least four times, maybe more. Transcript at 47. NAI representatives monitoring the examination review telephoned local police, and Petitioner was arrested pursuant to Section 455.2175, Florida Statutes. The materials used by Petitioner to copy examination answers were confiscated by police. Criminal charges were dismissed without conviction. Each examination question costs the state approximately $200. The 200 questions corresponding to the 200 answers copied by Petitioner will no longer be used by the state. Petitioner testified that he has dyslexia and attention deficit disorder. However, Petitioner has never requested additional time for an examination, never notified Respondent of Petitioner's disability, and never requested Respondent to provide special examination facilities or procedures.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that Respondent enter a Final Order denying Petitioner's request to take the state air conditioning contractor examination for the reasons stated herein. DONE AND ENTERED in Tallahassee, Leon County, Florida, this 26th day of October, 1994. DANIEL MANRY Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 26th day of October, 1994. APPENDIX TO RECOMMENDED ORDER, CASE NO. 94-1766 Petitioner's Proposed Findings of Fact Accepted in substance Rejected as conclusion of law 3.-8. Accepted in substance 9.-12. Rejected as irrelevant and immaterial 13. Accepted in substance 14.-15. Rejected as irrelevant and immaterial 16. Rejected as not supported by credible and persuasive evidence 17.-18. Rejected as irrelevant and immaterial Rejected as not supported by credible and persuasive evidence Rejected as irrelevant and immaterial and as recited testimony Rejected as not supported by credible and persuasive evidence Respondent's Proposed Findings of Fact 1.-8. Accepted in substance Rejected as irrelevant and immaterial Rejected as not supported by credible and persuasive evidence 11.-13. Accepted in substance COPIES FURNISHED: Richard Hickok Executive Director Construction Industry Licensing Board Department of Business and Professional Regulation 7960 Arlington Expressway, Suite 300 Jacksonville, Florida 32211-7467 Jack McRay Acting General Counsel Department of Business and Professional Regulation 1940 North Monroe Street Tallahassee, Florida 32399-0792 James W. Kline, Esquire P.O. Drawer 30 180 South Knowles Avenue Winter Park, Florida 32790-0030 Clark R. Jennings, Esquire Assistant Attorney General Deptartment of Legal Affairs Administrative Law Section Suite PL-01, The Capitol Building Tallahassee, FL 32399-1050

Florida Laws (3) 120.57455.2175455.229
# 2
CONSTRUCTION INDUSTRY LICENSING BOARD vs. DENVER SAMMONS, 86-003516 (1986)
Division of Administrative Hearings, Florida Number: 86-003516 Latest Update: Aug. 05, 1987

Findings Of Fact At all times pertinent to the issues herein, the Respondent, Denver Sammons, was licensed by the State of Florida as a registered air conditioning contractor, Class B, and Respondent qualified Denny's Air Conditioning Service under his license. At the January 8, 1985 meeting of the Broward County Central Examining Board of Mechanical Technicians, (Board), the Board heard a complaint by Port Distributors, a local air conditioning supplier, to the effect that Mr. Sammons had submitted two checks to that company in August, 1982, both of which were returned for insufficient funds and that neither had been redeemed. The Board decided to notify the Respondent of the complaint against him and give him an opportunity to respond at the next regularly scheduled meeting of the Board which was held on March 12,1985. At that Board meeting, at which Respondent was present, Mr. Julius M. Farinhouse, Jr., representative of Port Distributors, outlined its complaint against the Respondent detailing the circumstances surrounding the issuance of the bad checks and the need by the recipient to secure a judgment against the Respondent for the amount represented by the checks. There was evidence presented to the Board that these checks issued to Port Distributors were not the only checks written by Respondent that were not properly and promptly honored. Respondent testified before the Board regarding the circumstances surrounding the issuance of the checks and contested the seriousness of the offense alleging that when notified of the bad checks, he had reimbursed Port Distributors for the majority of the sum covered by the two dishonored checks, but this repayment was applied toward current accounts rather than in satisfaction of the bad checks, contra to the intention of the Respondent. Having considered both the testimony presented by the complainants and the Respondent, the Board, that same date, March 12, 1985, nevertheless entered a Final Order finding that the passing of bad checks to Port Distributors by the Respondent constituted an act involving dishonesty, fraud, deceit, or lack of integrity in the operation of Respondent's contracting business; that he failed to make any effort to pay the outstanding bill owed to Port Distributors; and that this misconduct constituted a failure to comply with the standards of Section 9-7, Broward County Code. As a result, the Board ordered the Respondent's Broward County Certificate of Competency revoked that date. The Order of the Board made provision for Respondent to apply for reinstatement of his Certificate of Competency but no such application has ever been made. For several years prior to the issuing of the Certificate of Competency by Broward County, Respondent had, under the old procedure, held a Certificate of Competency issued by the City of Hollywood, Florida and had, each year, renewed that Certificate upon the payment of a $30.00 fee. The Certificate issued by the city was renewed effective January 1, 1985 and reflected on its face, that it was good until December 31, 1985. However, when the Broward County Board of Mechanical Technicians began to issue its county-wide Certificate of Competency, all prior city-issued certificates were declared to be null and void. As a result, though Respondent continued to hold his Hollywood certificate, it was ineffective and he should not have been allowed to renew it by the city, since he was, at that time, covered by a county Certificate of Competency. By action of the Board on March 12, 1985, Respondent's Board (County- wide) Certificate of Competency, which was the only valid certificate he held at the time, was revoked. Because of this revocation, Respondent was, thereafter, allowed to work as a journeyman for another Master Technician but could not contract in his own name or for his own business nor could he pull building permits from any county or city building office. Notwithstanding this, on or about August 12, 1985, Respondent entered into a contract acting as Denny's Air Conditioning, with Isabel Parra. This contract was to remove her old heating and cooling system in her residence at 2207 North 46th Avenue in Hollywood and to install a new unit to consist of a three ton gas furnace with air conditioning coil and condenser. Pursuant to the contract, Respondent did, in fact, remove the old unit and install a new one. However, he did not pull a building permit with the county or city building office and on August 26, 1985, officials of the City of Hollywood issued a Notice of Violation to Mrs. Parra reflecting that Denny's Air Conditioning installed a central air conditioning unit without permit and without possessing a valid contractor's license. Mrs. Parra further contended that when she turned on the unit, the noise it made was extremely loud and not to her satisfaction. Evidence introduced by both Petitioner and Respondent, however, indicates that the Respondent installed the new unit exactly as the old unit had been installed. Mrs. Parra testified that she had not heard the old unit in its heating mode and therefore had no idea whether it made as much noise as the new unit did. In any event, she withheld some of the funds that were due Respondent until such time as he agreed to have someone come out and correct the problem. It has been several months since the parties agreed to this and Respondent still has not corrected the problem. He contends that the contractor with whom he arranged to correct Ms. Parra's problem has been unable to get with her since she works during the days and is home only in the evenings. In any event, though not charged as a violation, it would appear that Respondent has failed to follow through on his work and on his commitment to complete an acceptable installation for Mrs. Parra. Petitioner also alleges that on or about June 25, 1985, the Broward County Consumer Protection Board issued a cease and desist order to Respondent for representing that he was qualified to perform contracting work in Broward County without possessing local competency. No evidence was introduced, however, to satisfy or establish this allegation. Because of the dispute between Mrs. Parra and the Respondent, and her dissatisfaction with the quality of his installation, she filed a complaint with the Board and on December 10, 1985, the Board again met and heard her testimony and that of Mr. Sammons. As a result, on December 20, 1985, the Board found that Respondent's contract with Mrs. Parra was based on a representation to her that he was a contractor when in fact the prior action of the Board had denied him this status. The Board further found that he failed to pull a permit for the installation of the unit in Ms. Parra's home and thereafter failed to comply with the warranty given to her under the contract executed by him on August 12, 1985, nor did he provide her with the rebate promised. Based on these Findings of Fact, the Board concluded that the Respondent willfully, deliberately, or negligently disregarded or violated the provisions of the South Florida Building Code; that he contracted to act as a qualifying agent for his business when he was not certified to do so; that he contracted and did work which was not within the description of the class (journeyman) for which he had been certified by the Board; and that he abandoned without legal excuse a construction project in which he was engaged and under contract to complete. As a result, the Board ordered that his journeyman's Certificate of Competency be revoked effective that day. Once the journeyman's certificate was taken away, Respondent was not authorized to act as an air conditioning installer or contractor under any circumstances. Notwithstanding this, on February 20, 1986, Respondent again, acting as Denny's Air Conditioning, entered into a contract with Dr. Eisenstein to install a new two-ton split system in the doctor's home in Hollywood for a total price of $2,530.00. Since Dr. Eisenstein had previously dealt with Respondent on several occasions and found him to be reliable, the doctor responded to Respondent's request for an advance by giving him a $2,000.00 deposit. The contract was not actually finalized until late in March, 1986 and work was to begin in early April. However, on April 1, 1986, Respondent called Dr. Eisenstein and advised him that his truck, in which was stored the equipment for installation into the doctor's home and the money bag which contained the balance of the doctor's downpayment had been illegally repossessed by Respondent's bank the night before. As a result, Mr. Sammons indicated he would not be able to begin the project but assured the doctor that someone else would do so starting at the end of the week. In fact, no work was ever started by the Respondent or anyone else on his behalf. After several days, when Dr. Eisenstein attempted to call Respondent, he found that Respondent's phone had been disconnected and when on April 5, 1986, the date promised by Respondent, no one came to begin work on the project, the doctor began undertook an investigation which led to the ultimate contact of the doctor by the Respondent. To reach Respondent, Dr. Eisenstein had checked with Respondent's business landlord and when Respondent finally called the doctor back, he was irate that the doctor had done so. During that conversation Dr. Eisenstein advised Respondent that he should either repay the money advanced or do the work. In fact, neither was done. During the month of April, 1986, Dr. Eisenstein sent Respondent two letters by certified mail requesting that he either refund the advance payment or do the work promised under the contract. One letter was returned undelivered. The other was apparently delivered. When neither letter resulted in any satisfaction, the doctor, in early June, 1986, sent a letter of complaint to DPR outlining the situation. Respondent tells an incredible tale regarding the facts and circumstances which led up to the dispute with Dr. Eisenstein. Admitting that he was somewhat in debt to his bank, he claims that certain payments that he made to the bank with part of the money advanced by the doctor was used improperly by the bank and applied toward other obligations rather than the debt on his truck. He claims the repossession of the truck was illegal and improper because, by the payment mentioned above, if properly applied, the truck would have been paid off. This story is almost a duplicate of that regarding the excuse for the bad checks to Port Distributors. Respondent further contends that that bank thereafter engaged in a conspiracy against him to bring about his financial ruin; that the bank hired several individuals to assault him and his wife outside their church; that he has received several threats of bodily harm from the bank; and that all of this has resulted in his filing suit against the bank in local court. This story was told by the Respondent under oath. However, Respondent failed to provide any names or documentation to support this with the exception of the name of the bank allegedly involved. When asked where copies of the documentation were that would support his allegations, he responded with, "Oh, they're at home in a file." In short, it would appear that Respondent's story is a gossamer of fantasy which, while possibly believed at this point by Respondent, has very little basis in fact. Respondent also contends, for example, that Dr. Eisenstein requested that he not pull a permit for the work to be done at his house because he did not want city officials for one reason or another to know that the work was being done. This information was not brought out through Dr. Eisenstein, but rather through the testimony of the Respondent. None of these stories were backed up by any document or supporting evidence. Consequently, it is found that while Respondent may well believe what he is saying, his are in fact, incredible. Respondent was disciplined on two separate occasions by the Broward County Central Examining Board of Mechanical Technicians and Respondent has not shown that these actions were procedurally violative of due process. Consequently, they are found to have occurred and to be valid. Respondent was not permitted to attack the circumstances leading up to the action by the board and the Hearing Officer declined to relitigate the factual propriety of the Board's two actions. Once having lost his Master Technician's license, Respondent was no longer authorized to pull building permits in Broward County and notwithstanding that, nonetheless did commence work for Mrs. Parra on a job which, under the ordinances of the county, required a permit be pulled. He also failed to live up to the terms of a warranty inherent in his contract with her. The evidence also established that subsequent to the withdrawal of his Journeyman's certificate, he nonetheless entered into a contract for the installation of a system in Dr. Eisenstein's house and accepted a substantial advance payment which he neither returned nor earned when he failed to begin any work on the project. In the opinion of the Petitioner's expert, Respondent's conduct in this instance was totally unprofessional and unethical. In fact, as a professional, if the circumstances occurred as alleged by Respondent, he should have made immediate arrangements to in some way make restitution of the funds to his client or have the work done by someone else. The evidence here shows that Respondent made no effort to make some accommodation to the client. He entered no promissory note (Respondent claims that as a gentleman, he has no need of notes as his word is sufficient); he made no attempt to let the client know what had happened; and in short, it appears that Respondent was out to make a quick buck (the expert's phrase) without attempting to in any way satisfy his client.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is, therefore: RECOMMENDED that the Respondent's license as a registered air conditioning contractor be revoked. RECOMMENDED this 5th day of August, 1987, at Tallahassee, Florida. ARNOLD H. POLLOCK, Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 5th day of August, 1987. COPIES FURNISHED: G. Vincent Soto, Esquire Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32399-0750 Mr. Denver Sammons Post Office Box 7437 4614 Madison Street Hollywood, Florida 33021 Mr. Fred Seely Executive Director Construction Industry Licensing Board Post Office Box 2 Jacksonville, Florida 32201 Van B. Poole, Secretary Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32399-0750 Joseph A. Sole, Esquire General Counsel Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32399-0750

Florida Laws (3) 120.57489.117489.129
# 3
CONSTRUCTION INDUSTRY LICENSING BOARD vs. STEVEN ARY, 89-000748 (1989)
Division of Administrative Hearings, Florida Number: 89-000748 Latest Update: May 22, 1989

Findings Of Fact Based on the evidence received at the final hearing, the following findings of fact are made. At all times material to this case, the Respondent, Steven Ary, was a licensed air conditioning contractor in the State of Florida, holding license number CA CO36888. On October 20, 1987, a company named Jenni Temp Refrigeration Company, Inc., entered into a contract with Lauderhill Mall, Lauderhill, Florida, to install three 3 1/2 ton air conditioning units for the sum of $7,875. Jenni Temp was to provide the three separate permits required by the City of Lauderhill, Florida, for the installation. Joseph Roturra, the owner of Jenni Temp Refrigeration Company, Inc., and Respondent had, prior to October 20, 1987, entered into negotiations whereby Respondent would become employed by Jenni Temp as its qualifying agent so that Jenni Temp could engage in air conditioning contracting. Those negotiations ended before any formal efforts were made to have Jenni Temp licensed with Respondent as the qualifying agent. In late 1987, before his negotiations with Jenni Temp broke down, Respondent signed three blank application forms for electrical and air conditioning permits. Respondent then gave the three signed application forms to Joseph Roturra. Respondent knew that neither Joseph Roturra nor his company was licensed for air conditioning work. Joseph Roturra completed the signed blank application forms he received from Respondent and made application with the City of Lauderhill, Florida, for the three permits required for the job at Lauderhill Mall. The name of the applicant on the applications as completed by Joseph Roturra was All Star Service, Inc. Respondent served as the qualifying agent for All Star Service, Inc. The City of Lauderhill did not issue the permits for which Roturra applied using the forms signed by Respondent because permits had been previously issued to another company for the same job. Jenni Temp completed the Lauderhill Mall job without the permits required by local law and without further assistance from Respondent. Respondent did not supervise the job at Lauderhill Mall. There was no final inspection of the work as required by local law.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that a final order be entered finding Respondent guilty of having violated Sections 489.129(1)(e) and (m), Florida Statutes and which imposes an administrative fine on Respondent in the amount of $500 for the violation of Section 489.129(1)(e), Florida Statutes. It is further recommended that there not be a separate fine for the violation of Section 489.129(1) (m), Florida Statutes, because the conduct that establishes that violation is the same conduct which constitutes the violation for which the administrative fine is recommended. DONE and ENTERED this 22nd day of May, 1989, in Tallahassee, Florida. CLAUDE B. ARRINGTON Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 22nd day of May, 1989. APPENDIX The findings of fact contained in paragraphs 1, 2, 3, 4, 5, 6, 7, 8, 9, l0, 13, 14, 15, 19 and 20 of Petitioner's proposed findings of fact are adopted in substance, insofar as material. The findings of fact contained in paragraphs 11, 12, 16, 17 and 18 of Petitioner's proposed findings of fact are immaterial. COPIES FURNISHED: Kenneth E Easley, General Counsel Department of Professional Regulation 1940 North Monroe Street Tallahassee, Florida 32399-0729 Fred Seely, Executive Director Department of Professional Regulation Construction Industry Licensing Board Post Office Box 2 Jacksonville, Florida 32201 Elizabeth R. Alsobrook, Esquire Department of Professional Regulation 1940 North Monroe Street Tallahassee, Florida 32399-0729 Steven Ary 1217 N. E 4th Street Pompano Beach, Florida 33306

Florida Laws (5) 120.57489.105489.119489.127489.129
# 5
FLORIDA REAL ESTATE COMMISSION vs BARBARA OWEN MOONEY AND WILLIAM B. WILTSHIRE, JR., 90-003868 (1990)
Division of Administrative Hearings, Florida Filed:West Palm Beach, Florida Jun. 25, 1990 Number: 90-003868 Latest Update: Mar. 05, 1992

The Issue The issue for determination in this proceeding is whether Respondent committed the acts alleged in the Administrative Complaint and, if so, what disciplinary action, if any, should be imposed.

Findings Of Fact Petitioner is the state licensing and regulatory agency charged with the responsibility and duty to prosecute administrative complaints pursuant to the laws of the State of Florida. Respondent is now and has been at all times material to this proceeding a licensed real estate salesman in the state, holding license number 0488568. The license was issued %Tequesta Properties, Inc., 169 Tequesta Drive, Tequesta, Florida 33458 ("Tequesta"). On June 29, 1989, Respondent negotiated a contract for the sale and purchase of a single family residence located at 65 Willow Road, Tequesta, Florida (the "contract"). The residence was listed for sale with Tequesta. The sellers were Frank and Hilda Sceusa, and the buyers were Dale and Cathy Favre. The buyers first saw the listed property at an open house. Respondent was present at the open house because the listing agent was busy with another transaction. The contract provided: Inspection, Repair And Maintenance: Seller warrants that as of 10 days prior to closing, the ceiling, roof . . . and exterior and interior walls do not have any VISIBLE EVIDENCE of leaks or water damage and that the septic tank, pool, all major appliances, heating, cooling, electrical, plumbing systems, and machinery, are in WORKING CONDITION. Buyer may, at Buyer's expense, have inspections made of those items by an appropriately Florida licensed person dealing in the construction, repair, or maintenance of those items and shall report in writing to Seller such items that do not meet the above standards as to defects together with the cost of repairing them prior to Buyer's occupancy or not less than 10 days prior to closing whichever occurs first. Unless Buyers report such defects within that time, Buyer shall be deemed to have waived Seller's responsibilities as to defects not reported. . . . Buyer shall be permitted access for inspection of property to determine compliance with this Standard. Respondent failed to give the buyers a reasonable opportunity to inspect the house or to have it inspected by a professional inspector. Buyers requested a pre-closing inspection approximately three or four times. Each time the buyers made their request through Respondent. The buyers asked Respondent to arrange for their access into the property for the purpose of conducting an inspection. Respondent ultimately accompanied the buyers through the premises the night before the closing. Respondent misrepresented the condition of plumbing in the house. During the walk-through the night before the closing, the buyers asked Respondent about a rag covering the goose neck under the kitchen sink. Respondent advised the buyers that the rag was left there after cleaning and that nothing was wrong with the plumbing. Respondent misrepresented the provisions of a warranty that was transferred to the buyers with the sale of the house. The house was sold to the buyers with a home owners warranty ("HOW") purchased by the listing broker. Respondent told the buyers they did not have to worry about the appliances in the house, including the air conditioning, because the entire property was covered by the warranty. Respondent specifically represented that the air conditioning system was in good working order. Respondent never read the HOW contract and did not explain to the buyers exclusions for preexisting conditions, prorations for other conditions, and the requirement that the buyers pay a $100 deductible for each covered defect. Respondent failed to familiarize himself with the house and failed to inquire of the sellers as to any problems that existed in the house. The kitchen sink backed up within a month after the date of closing because it was clogged with sand. The pipe was rusted completely through and there was a three inch gash in the pipe. The rag that had covered the pipe during the walk through concealed the defects in the pipe that otherwise would have been readily visible. The air conditioning system failed after closing. The repairs to the air conditioning system were not covered by the HOW contract. Representatives of HOW determined that the problems with the air conditioning system were preexisting and not covered under the terms of the contract. The air conditioning unit was replaced by the buyers who were reimbursed by the listing broker. The buyers experienced problems with a number of the components in the house. In addition to the previously mentioned air conditioning and plumbing problems, there were electrical problems and all of the appliances had to be replaced. Respondent misrepresented the amount of known repairs. The buyers knew prior to closing that the pool needed to be re-marcited. Respondent represented that the cost of such a repair would be approximately $1,000. The actual cost was approximately $3,000. Some of the problems experienced by the buyers were patent defects and some were latent defects. All of the problems, however, could have been discovered and corrected prior to closing if an inspection had been conducted by a Florida licensed person experienced in the construction, repair, and maintenance of such matters. Respondent failed to carry out his responsibilities as a real estate professional. It is customary practice in the community for the selling agent to arrange for pre-closing inspections done by professional licensed inspectors. The listing agent for the residence asked Respondent the day before the closing if Respondent had scheduled the pre-closing inspection. Respondent admitted that he had forgotten to schedule the inspection. When Respondent scheduled a walk through for the buyers the night before closing, there was insufficient time for the buyers to schedule an inspection by a professional inspector. The buyers relied upon the representations of Respondent with respect to the HOW contract and the condition of the house.

Recommendation Based upon the foregoing Findings of Facts and Conclusions of Law, it is RECOMMENDED that Petitioner should enter a Final Order finding Respondent guilty of misrepresentation and culpable negligence in violation of Section 475.25(1)(b), Florida Statutes, suspending Respondent's license for 90 days, imposing an administrative fine of $600, and placing Respondent on probation for one year. The Final Order should further provide that during the period of probation Respondent should complete 60 hours of post-licensure education. DONE and ENTERED this 22nd day of January, 1992, in Tallahassee, Leon County, Florida. DANIEL MANRY Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 23rd day of January 1992.

Florida Laws (2) 120.57475.25
# 6
CONSTRUCTION INDUSTRY LICENSING BOARD vs. SAM POLLOCK, 87-003904 (1987)
Division of Administrative Hearings, Florida Number: 87-003904 Latest Update: Jun. 03, 1988

Findings Of Fact At all times relevant hereto, respondent, Sam Pollack, held certified air-conditioning contractor license number CA-C008663 issued by petitioner, Department of Professional Regulation, Construction Industry Licensing Board (Board). He has been licensed by the Board for approximately sixteen years. Respondent used his license with and was qualifying agent for a firm known as Dr. Cool's Clinic, Inc. located at 10662 Southwest 186th Lane, Miami, Florida. Around April 1, 1986 Steven and Beverlee Swerdlen moved into a 1,400 square foot prefabricated modular home at 19800 Southwest 180th Avenue, Miami, Florida. The home is located in a large modular home subdivision known as Redland. Although a modular home resembles a mobile home in certain respects, it is considered to be a fixed, permanent residential dwelling under local building codes. The home had previously been a model unit in the subdivision and had never been lived in since being built at least three years earlier. On April 3, 1986 respondent entered into a contract with Steven Swerdlen to install a Rheem four-ton air conditioning unit at Swerdlen's home. The contract called for a total price of $2152.50. The Swerdlens paid for the job in full the same day by credit card. Because Swerdlen's home had the ductwork and twenty outlets already in place, Pollack was to adapt the unit to the existing ductwork. Respondent's firm was selected over other firms because Mrs. Swerdlen was impressed with Pollack's advertisement which represented that Pollack provided "air conditioning designed and serviced for people with allergies and other respiratory problems." This was important to her since she suffers a heart condition and requires air-conditioning during warm weather. She also accepted respondent's oral representations that he had the experience and expertise to satisfy her needs. The ductwork in the home was accessible through a small crawlspace located under the floor. There were also two vents under the floor to prevent a buildup of moisture. The flooring in the home was made of particle board and was sealed with a vapor barrier which was designed to protect it from moisture damage. When the Swerdlens purchased their home, the vapor barrier was already cracked in several places and, coupled with the fact that the area had only two vents, the floor was susceptible to moisture damage. Before a central air-conditioning unit is installed, a prudent and competent air-conditioning contractor should take measurements of the home, perform heat loss calculations and inspect the existing ductwork to insure that the proper size unit is being installed. The evidence is sharply conflicting as to what steps, if any, were undertaken by respondent when he visited the Swerdlen home on April 3 to discuss the job. It is found, however, that Pollack made a visual inspection of the home but did not take formal measurements or make heat loss calculations. He inspected the ductwork to the extent he looked under the house through the crawlspace opening. He noted a potential problem with the vapor barrier and a supply duct hookup location that was blocked by a pier (support). He mentioned to Mrs. Swerdlen that she needed additional ventilation windows underneath the home and that she had a potential moisture problem with the vapor barrier. However, he did not suggest that she wait and have those matters corrected before he installed the unit. The unit was installed on April 7, 1986, or four days after the contract was signed. Besides respondent and a helper, Mrs. Swerdlen was the only person present. No electricians were called in to assist on the job. According to Pollack, the only electrical work that he performed was the installation of the thermostat unit in the closet under the fuse box and the internal electrical connections to the unit. As to this latter work, Pollack stated he did not believe an electrical license was needed to connect the terminal wires to the air-conditioning unit. He did not obtain a building permit from the county nor did he request an inspection of his work. Both were required by county regulations. Because the supply duct hookup was blocked by a pier, Pollack was forced to place a three or four foot high supply duct in a bedroom closet. Without advising the Swerdlens as to the extent or nature of modifications needed to bypass the pier, Pollack cut a large, unsightly hole in the closet floor. It was also necessary to penetrate the vapor barrier when the hole was cut. The cut was never resealed. The new duct took up much of the closet space and was vulnerable to puncture damage. A photograph of the supply duct is found in petitioner's exhibit 14. After the work was completed, Pollack did not advise the Swerdlens that the vapor barrier had been broken or that it needed to be resealed to avoid moisture damage to their floor. The power source to the air-conditioning unit was a 10-gauge wire. Since the unit required a larger gauge, it was necessary that an 8-gauge wire be installed. Pollack and his helper left for one and one-half hours at lunch during the day of installation, and Pollack claims the wire was changed by someone during the time he was gone. The Swerdlens contended they knew nothing about electrical wiring and could not perform the task themselves. Their testimony is accepted as being more credible and it is found that Pollack, even though he was not licensed as an electrician, changed the electrical power source wiring. In addition, Pollack did all other electrical work required for the installation of the unit. In doing so, he made no provision for overload, left exposed wiring in the closet by the thermostat and failed to provide a service disconnection switch for the unit inside the home. Until these deficiencies were corrected several months later, the Swerdlens could smell a burning odor in their home. According to industry standards and local building code requirements, the unit should have been placed on a concrete slab. However, Pollack used two sets of concrete runners obtained from the unit manufacturer. He justified this on the ground that many other homes in the same subdivision did not have slabs under their units. Even so, this did not justify a deviation from code requirements. Because a slab was not used, the unit sank into the ground after the first rainfall. Pollack eventually installed a cement slab in November, 1986 after being ordered to do so by local building officials. The Swerdlens' floors began to buckle and ripple within a short time after the unit was installed. It began in the bathroom directly above the area where Pollack had penetrated the vapor barrier to install the supply duct and was exacerbated by the closure of one of the two vents under the floor when Pollack installed the unit. The damaged floor is memorialized in photographs received in evidence as petitioner's exhibit 14. Mrs. Swerdlen contacted respondent after the above problems began to occur. Other than adjusting the thermostat to get better cooling, Pollack did nothing since he did not think he was responsible for the other problems. He offered to make the other changes for additional compensation and if the Swerdlens would agree to release him from all liability. After declining Pollack's offer, Mrs. Swerdlen had other persons or companies make the needed repairs. Most of the costs were paid by her insurance company. She also contacted the Metropolitan Dade County Building and Zoning Department (Department) and the Board. The Department learned that no permit had been obtained by Pollack even though one was required and that no inspections had been made during and after the work. Pollack obtained an after-the-fact permit on November 24, 1986, after paying a double fee and a $100 violation fee for failing to timely obtain the permit. After being contacted by Mrs. Swerdlen, a Department mechanical inspector made an inspection of the Swerdlens' home on November 24, 1986. He found several violations of the local building code including (a) a failure to obtain a permit and have required inspections made, and (b) improper electrical work. A summons was issued against Pollack for these violations. The disposition of the summons is not of record. The inspector also noted that the vapor barrier around the closet supply duct had not been resealed, that the flooring was warped above the cut and that the unit was not on a concrete slab. Although the inspector suggested that Pollack correct these deficiencies, only the latter deficiency was corrected. The work never passed final inspection. The Board employed a Jacksonville residential contractor as its expert in this case. Although the expert did not personally inspect the property, he reviewed photographs of the site, respondent's deposition and the investigative file and spoke with the Swerdlens by telephone. According to the Board's expert, Pollack was guilty of gross negligence by performing work that exceeded the scope of his license, performing potentially hazardous electrical wiring, installing a non-efficient system in the Swerdlens' home, failing to follow accepted industry rules concerning static friction, velocities, noise levels and filtration, failing to properly inspect the home prior to installation, improperly installing the unit, damaging the vapor barrier, installing a large supply duct in the closet without obtaining the Swerdlens' approval and failing to use a cement slab to support a heavy unit. He further opined that respondent was deceitful by selling the system in the manner that he did, particularly since it was sold and installed within a four day period with no thought given to or preparation taken as to the problems that might be encountered. The expert agreed that the work was made more difficult by the position of the pier but stated that Pollack should have explained this problem to the Swerdlens and obtained their approval prior to cutting through their closet floor. Pollack has worked in the air-conditioning business for around 26 or 27 years, of which two were spent as a building inspector for Dade County in the late 1960s. He contended he warned Mrs. Swerdlen about the penetrated vapor barrier, the blocked air duct and the lack of a sufficient number of vents. Pollack also stated he advised Mrs. Swerdlen it was her responsibility to get an electrician to do all electrical work. However, these contentions are rejected as not being credible. Moreover, if there were special problems with the Swerdlens' home, it was respondent's responsibility to design and install a system that was compatible with those special needs. Pollack asserted that the Swerdlens' home was actually a mobile home, and he was under the impression that permits were not required for work on this type of home. However, this contention is irrelevant since Dade County has required permits for air conditioning work on both fixed and mobile homes for at least the last ten years.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that respondent be found guilty of violating Subsections 489.129(1)(d), (j), and (m), Florida Statutes (1985), that he pay a $3,000 civil fine within thirty days from date of a Final Order in this cause, and that his license be suspended for thirty days, or until the fine is paid if after the expiration of said thirty day period. DONE AND ORDERED this 3rd day of June, 1988, in Tallahassee, Leon County, Florida. DONALD R. ALEXANDER Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 3rd day of June, 1988.

Florida Laws (3) 120.57489.117489.129
# 9
CONSTRUCTION INDUSTRY LICENSING BOARD vs. FRANK WALLACE, 87-005050 (1987)
Division of Administrative Hearings, Florida Number: 87-005050 Latest Update: May 23, 1988

Findings Of Fact The following findings of fact are based upon the evidence presented, Respondent's admissions and matters deemed admitted due to Respondent's failure to timely respond to Petitioner's Second Request for Admissions: At all times material hereto, Respondent was licensed by the Construction Industry Licensing Board as a registered air conditioning contractor with license number RA-0035721. He was the qualifying agent for Wallace's Air Conditioning and Heating. Respondent's address of record is 4710 Cypress Ridge Place, Tampa, Florida 33624, and it was to this address that notice of the hearing was sent. At no time prior to the hearing did Respondent contact counsel for Petitioner or the undersigned regarding any problem he had with the date scheduled for this hearing. Respondent did not appear, and was not represented at the hearing which commenced at 9:00 a.m. on May 11, 1988. However, at 1:56 p.m. on the day of hearing, a letter from Respondent addressed to Petitioner's counsel was filed at the Division of Administrative Hearings in Tallahassee, Florida. This letter was postmarked on May 9, 1988 and requests rescheduling of the hearing due to his being out of town on "urgent business." By Order entered on May 13, 1988, Respondent's untimely and insufficient motion for continuance was denied for failure to comply with Rule 22I-6.017, Florida Administrative Code, and this case has proceeded to the issuance of this Recommended Order in accordance with the procedures established at hearing. On or about March 18, 1986, Respondent, as qualifying agent for Wallace's Air Conditioning and Heating, entered into a contract with General Engineering and Machine Company for the installation of heating, ventilation and cooling services (HVAC) at the Sebring Square Plaza shopping mall in Sebring, Florida. The work to be performed included the installation of heating, ventilation, air conditioning and temperature control systems for stores in the mall, which included Zayre's Department Store and thirty "strip stores." The contract price for this work was $275,460. Respondent thereafter began work on the mall under this contract. However, he has never held any certificate of competency, occupational license, or registration in the City of Sebring, as required by local ordinance sections 5-18 and 5-19. On or about May, 1986 Respondent entered into a subcontract agreement with Long's Air Conditioning and Heating for sheetmetal duct work, venting of exhaust fans and installation of flex duct and grilles at the Sebring Square Plaza. The original amount of Respondent's contract with Long's Air Conditioning was $69,200, but this was increased by agreement to $72,200. On or about June 19, 1986, work on the thirty "strip stores" was deleted from this subcontract agreement, and the contract price was then reduced by $3,760, making a final contract price of $68,440. Respondent received draw requests totaling $68,440 from Long's Air Conditioning for work performed under this subcontract. Although all contracted work was performed by Long's Air Conditioning, Respondent has only made payments totaling $66,500, leaving an unpaid amount of $1,940. In connection with his work on the Sebring Square Plaza, Respondent purchased equipment and supplies from Florida Air Conditioners, Inc., in the total amount of $122,019.80, but made no payments on this account. On October 6, 1986, Respondent's account with Florida Air Conditioners was paid in full by Highway 27 Associates, the owners of the Sebring Square Plaza, who in turn charged this amount to the general contractor, General Engineering and Machine Company, by reducing the amount they paid to said general contractor on the Sebring Square Plaza. Charles R. Baldwin was the general administrator on this shopping mall job for the general contractor, General Engineering and Machine Company. In accordance with his subcontract agreement with Respondent, if Respondent did not pay his materialmen, the general contractor was responsible, and, in fact, in this case the general contractor was charged for payments made by the mall owner on Respondent's account at Florida Air Conditioners. Respondent failed to regularly attend weekly job site status meetings with Baldwin. When schedules were established, Respondent voiced no objection, but he then frequently failed to complete work in accordance with those schedules. Respondent made little effort to complete his work on time, or to make up for delays. He failed to supervise the work he was performing at the Sebring Square Plaza. On or about June 24, 1986 Respondent walked off the job without completing the work which he had contracted to perform, and this caused further delay in the mall's completion since Baldwin had to find another contractor to complete Respondent's job. Baldwin paid Respondent $174,467.70 on June 18, 1986 in connection with this job after Respondent signed an affidavit certifying that he had paid all his materialmen and subcontractors. The record establishes that said affidavit was false. With the amount Baldwin was charged for Respondent's unpaid account with Florida Air Conditioners, and the amount paid on June 18, 1986, General Engineering and Machine Company paid or was charged approximately $296,000 for work performed by Respondent, although their contract with Respondent was only $275,460. According to Bernard Verse, who was accepted as an expert in commercial construction, Respondent's failure to pay for supplies and equipment, and his failure to complete his contract with General Engineering and Machine Company constitute misconduct in contracting. In addition, Respondent failed to properly supervise the work he was performing, and for which he contracted, on this job.

Recommendation Based upon the foregoing, it is recommended that the Construction Industry Licensing Board enter a Final Order suspending Respondent's license number RA- 0035721 for one (1) year and imposing an administrative fine of $5,000; provided that after the expiration of thirty (30) days from the issuance of the Final Order if Respondent pays said administrative fine in full, his license shall be immediately reinstated. DONE AND ENTERED this 23rd day of May, 1988, in Tallahassee, Florida. DONALD D. CONN Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 23rd day of May, 1988. APPENDIX TO RECOMMENDED ORDER, CASE NO. 87-5050 Rulings on Petitioner's Proposed Findings of Fact: 1 Adopted in Finding of Fact 1. 2-3 Adopted in Finding of Fact 3. 4 Adopted in Finding of Fact 4. 5 Adopted in Finding of Fact 9 6 Adopted in Finding of Fact 5. 7 Adopted in Finding of Fact 7. 8 Adopted in Findings of Fact 7, 8. 9-10 Adopted in Finding of Fact 6. Adopted in Finding of Fact 10. Adopted in Finding of Fact 6. Rejected as irrelevant and not based on competent substantial evidence. Adopted in Finding of Fact 7. Rejected as irrelevant. COPIES FURNISHED: David L. Swanson, Esquire Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32399-0750 Frank W. Wallace 4710 Cypress Ridge Place Tampa, Florida 33624 Fred Seely Executive Director Construction Industry Licensing Board Post Office Box 2 Jacksonville, Florida 32201 William O'Neil, Esquire General Counsel Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32399-0750

Florida Laws (4) 120.57489.105489.117489.129