ROBERT H. HATFIELD vs. DEPARTMENT OF NATURAL RESOURCES, 85-002777 (1985)
Division of Administrative Hearings, Florida Number: 85-002777 Latest Update: Jun. 20, 1986

Findings Of Fact Because of a 1984 Thanksgiving Day storm which inflicted damage in coastal areas, Barry Manson-Hing, an area engineer employed by the Department, issued emergency coastal construction permits from a temporary office in the Vero Beach Administration Building. On December 3, 1984, Respondent sought an emergency permit to allow him to place sand and sand-filled bags on his coastal property at 3755 Ocean Drive, Vero Beach, Florida. Respondent asked Mr. Manson-Hing if he could use sand from the beach to restore eroded areas. Mr. Manson-Hing said he could not, and told him that sand would have to be obtained from an upland source. Respondent replied that he had an available source of upland sand and would haul it by truck to the beach site. He also mentioned that he would remove an existing pine tree to allow vehicular access. On the next day, December 4, 1984, Mr. Manson-Hing issued an emergency coastal construction permit, #1R-127E, to Respondent. The permit allowed Respondent to place 1,500 cubic yards of sand fill material to restore eroded beach and dune areas at the site, and also permitted him to temporarily place sand-filled bags on filter cloth. In capital letters, the permit warned, "SCRAPING OF THE BEACH IS PROHIBITED." (Dept. Exhibit 4) On December 5, 1984, Lt. Raymond Barker of the Vero Beach Police Department, observed beach scraping activities being conducted on Respondent's coastal property. Respondent was present on the site. Beach sand seaward of the Coastal Construction Control Line for Indian River County had been scraped and deposited at the face of the sand dune. The removal of the sand created depressions in the beach area seaward of the Coastal Construction Control Line. Lt. Barker ordered Respondent to cease the activity until it could be determined he had the required authorization. Respondent complied with Lt. Barker's order. The scraping of the beach and removal of sand below the coastal construction control line was accomplished without a permit from the Department. On July 17, 1985, the Department entered its "Final Order" assessing Respondent a $500 fine for unauthorized coastal construction activities in violation of Section 161.054, Florida Statutes (1985). Respondent requested a hearing; resulting in this proceeding.

Recommendation Based on the foregoing, it is RECOMMENDED: That the Department assess, impose, and collect an administrative fine of $500, to be paid within 30 days of final agency action. DONE AND ORDERED this 20th day of June, 1986, in Tallahassee, Florida. R. L. CALEEN, JR. Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings the 20th day of June, 1986.

Florida Laws (3) 120.57161.053161.054
# 1
CAROLE POPE vs DEPARTMENT OF ENVIRONMENTAL PROTECTION, 93-004560 (1993)
Division of Administrative Hearings, Florida Filed:Cocoa, Florida Aug. 17, 1993 Number: 93-004560 Latest Update: May 10, 1994

The Issue Whether the Petitioners, and each of them, have standing to bring the instant action before the Division of Administrative Hearings. Whether the 5500 North Corporation has meets the requirements set forth in Section 161.053, Florida Statutes, and Rule 16B-33, Florida Administrative Code, for obtaining a permit to construct a structure seaward to the coastal construction control line (CCCL).

Findings Of Fact The Department of Environmental Protection, f/k/a Department of Natural Resources, is the state agency charged with the responsibility of regulating coastal construction under Chapter 161, Florida Statutes. 5500 North Corporation (Respondent/Applicant) is the owner of the property located at 5600 North Atlantic Avenue, Cocoa Beach, Brevard County, Florida 32931. 5500 North Corporation submitted an application for a coastal construction control line (CCCL) permit to build on the vacant portion of its property, a seven (7) story building, along with required access drives and parking, as an addition to the Cocoa Beach Days Inn Hotel complex. The site of the proposed Days Inn Tower fronts on the Atlantic Ocean and is located three (3) miles south of Port Canaveral, near DNR survey monument R-16. The application and attached document were compiled and submitted to the Department of Environmental Protection by Plata Engineering, Inc., and consisted of the following documents: Application to the Department for the proposed construction of the building, consisting of three pages, front and back, six pages total. A legal description of the property, and a Warranty Deed for the property demonstrating ownership in 5500 North Corporation. Reduced certified survey of the site, showing control lines and other required information. Reduced Site Plan prepared by Plata Engineering, Inc. Section C - which is a section through the site plan, showing the dune configuration in relation to the proposed building and the construction control lines. A depiction of a section through the proposed building and some of its structural elements. Full size drawing of the proposed site. Turtle assessments form with attached lighting specifications of the manufacturer, and aerial of the site attached. Structural Design Calculations. Complete set of Building Plans, dealing with floor planning, and the structural elements of the calculations that were submitted with the structural calculations. The application was deemed complete, and on May 20, 1993, the Department issued a proposed Final Order issuing Permit Number BE-760 for the proposed structure. Standing of Petitioners Petitioner, Carole Pope, resides in the City of Rockledge, Brevard County, Florida. She is the owner of Lot 11, Block 101 of the platted subdivision known as Avon-By-The Sea which is located in unincorporated Brevard County, north of the existing north boundary of the City of Cocoa Beach. A duplex dwelling unit is located on the parcel. Petitioner occupies one unit annually during the summer. Petitioner Pope's property is not adjacent to the property where the proposed Days Inn Tower is to be located. The property is located approximately three blocks directly north of the proposed building and measures 475 feet east- west by 50 feet north-south and is bounded on the east by the Atlantic Ocean. Petitioners, Hugh and Cora Harris, own property located at Lot 13 of replat of Blocks 104 and 105, Avon-by-the Sea, in the unincorporated land of Brevard County, which borders on the City of Cocoa Beach. Petitioners' property is located across Young Avenue, and north of the property owned by 5500 North Corporation. The Harris's property contains a single family dwelling unit and is adjacent to the property were the proposed Days Inn Tower is to be located. Petitioners, Patricia A. and Eugene A. Wojewoda, own a unit at the Cocoa Beach Towers, a multi-family condominium, which is located north of the property owned by 5500 North Corporation, across Young Avenue, in the City of Cocoa Beach. The Wojewoda's unit is located on property which is adjacent to the property where the proposed Days Inn Tower is to located. Petitioners Wojewodas are Real Estate Brokers and owners of Professional Touch Realty, Inc. One of their four offices is located at 108 Young Avenue, immediately across the street and north of the subject property. Petitioners, Howard and Martha Crusey, own a unit, which they rent out, in the Cocoa Beach Towers, which is located north and adjacent to the property owned by 5500 North Corporation. Petitioners reside at 430 Johnson Avenue in Cape Canaveral, Florida. The Department sent out a notice for public comment to each of the immediate adjacent property owners. Existing Uniform and Continuous Line of Construction As part of the application process, the Department made a determination of the existing line of uniform and continuous construction. The existing line of uniform and continuous construction is a theoretical line that goes from the most seaward extent of the two adjacent structures, where adjacent structures exist, and extends north and south along the seaward edge of the structures. In the instant case, there is historical development of major habitable structures on either side of the parcel for which the proposed building is being constructed and which are co-terminus with the prior CCCL. The footprint of the proposed Days Inn Tower does not extend seaward of the existing uniform and continuous line of construction, although a new structure (Discovery Beach) north of the Cocoa Beach Towers has been constructed landward of the current CCCL. The existing structures, which form the existing line of uniform and continuous construction, have not been unduly affected by erosion. The property was purchased by 5500 North Corporation in 1988. The property was commercially developed with the existing hotel buildings between 1959 and 1962, and the site has been operated as a hotel since that time. The footprint of the building was set by the engineers based on the parking requirements of the City of Cocoa Beach, and environmental concerns. It was determined that if the parking were located on the seaward side of the building, there would be drainage problems, and the need for a storm water treatment system for the parking lot. With the parking lot located landward of the proposed building, there will be no drain off to the side areas, but rather drain off would be to the middle of the property where the exfiltration system is located. The parking lot located landward of the proposed building meets the City of Cocoa Beach parking requirements and the drainage requirements. When siting the footprint of the proposed building, the engineers also took into consideration the fact that if the parking were located on the seaward side of the proposed building, the headlights would shine out to the beach and possibly impact sea turtles nesting. The applicants stated that construction seaward of the control line or 50-foot setback is considered necessary for reasonable use of the property, for the following reasons: The proposed building is basically an addition to a completion of the original concept of the overall hotel complex that was never completed in the past due to either financial or room availability need. The proposed placement seaward of the CCCL can be attributed to the configuration of the existing on-site buildings and the require- ment to satisfy the City of Cocoa Beach's extensive parking and limited access point requirements that have been subjected to this proposed site development. Please note that the proposed building is not being placed seaward of the existing line of continuous construction that has been established by the adjacent buildings to the north and the south. The Department determines necessity based upon the impacts the proposed structure will have on the active beach, and the dune system, and the neighborhood properties including the subject property, how the property is zoned, and whether it is situated behind the existing continuous line of construction. It is the Department's opinion that if the proposed building is in compliance with the standards established in Chapter 16B-33, F.A.C., the necessity of the proposed building has been justified. Impacts to the Beach-Dune System The greater weight of evidence supports the conclusion that the shoreline fronting the site of the proposed Days Inn Tower is stable. This section of the coastline has historically been accretional, and still continues to be accretional. There exists adequate evidence of current littoral trends. There exists accepted methodologies for determining evidence of expected wind, wave, hydrostatic and hydrodynamic forces associated with the design storm event which was presented in 5500 North Corporation's application for CCCL permit. Based on the 1989 Brevard County Study conducted by Olsen and Associates, Inc., there is no erosion at the location of the proposed building, instead the shoreline is prograding seaward instead of landward. Therefore, the shoreline is at least stable or accretional. Based on its in-house analysis, the Department of Environmental Protection conservatively adopted an erosion rate of one foot per year, which is considered a relatively minor erosion rate. Based on the Department of Environmental Protection's projection of the erosion for the area being one foot per year, the location of the proposed building lies well in excess of 200 feet landward of the thirty-year seasonal high water line. Although the proposed structure extends 118 feet seaward of the CCCL, the setback of the proposed building from the existing dune line is significant; therefore, there was no evidence of a threat of impact on the beach, to the beach or dune system as a result of the construction at the specific site. There are existing devices (i.e., an existing fence on the property which funnels people into boardwalks so that people cannot walk uncontrolled on the beach dune system) implemented in Brevard County and specifically on the site which will help manage people impacts as well. The setback between the dune and the proposed construction qualitatively relates to the ability of the site to recover after a one-hundred year storm. If a structure is located too far seaward, either immediately adjacent to or on top of the dune, it would inhibit the natural storm recovery process. The proposed building is set a significant distance landward of the dune formation itself, so there will be adequate room for the dune to recover in the future should there be a one-hundred year storm event. The proposed structure is located at a sufficient distance landward of the beach-dune system to permit natural shoreline fluctuations and to preserve the dune stability and the natural recovery following storm induced erosion. The proposed construction will not have a cumulative impact that will threaten the beach or dune system or its recovery potential following a major storm event. low. Impacts to Adjacent Property Owners The probability of potential impacts to adjacent property owners is One reason the proposed building will not have adverse impacts to adjacent properties is that the proposed building is located significantly landward, and does not go further seaward than the existing line of construction. The adjacent buildings were constructed landward of the previous CCCL. The nature of the design associated with the particular project or the structural components of the design also minimize the impact to the parcel and to adjacent parcels. The first feature of the design of the proposed building is that the major habitable floors of the building are above the elevation of the one- hundred year storm and wave activity on top of the storm surge, so they will not be impacted by the water height or the wave activity of the storm. The second feature of the design of the proposed building is that everything below the habitable floors is designed to break away and lie down during any impact by wave activity, which allows the storm to go through the building rather than having those forces exerted on the building itself. The frangible driveway is designed so that the individual stones will fall as the grade falls, and most of them will end up buried in the event of a storm. The third feature of the design of the proposed building is that the building is elevated on a pile foundation which is sunk to a depth which is sufficient to accommodate for the anticipated erosion of a one-hundred year storm, and the pile caps are sunk well into the ground so that they do not contribute to erosion. Therefore, the building has been designed to withstand the one-hundred year storm, and the dynamics of the storm are allowed to go through the building and to be dissipated, in contrast to endangering the building or endangering adjacent properties. Due to the fact that the proposed building is "super-elevated and the portions that are actually impacted by the one-hundred year storm being frangible," the proposed building will not impact the adjacent properties. The proposed Days Inn Tower would serve to protect the adjacent Cocoa Beach Towers, and Petitioner Harris's property, by blocking the impact of a storm coming from the southeast. The proposed structure is designed so as to minimize any expected adverse impact on the beach dune system or adjacent properties or structures and is designed consistent with Section 16B-33.005, Florida Administrative Code. The proposed building meets the requirements of Chapter 161, Chapter 16B-33, Florida Administrative Code. Structural Design of Proposed Building The applicant provided adequate engineering data to the Department concerning the construction design of the building. The structure is designed in accordance with the minimum building code adopted for the area pursuant to Section 553.70-553.895, Florida Statutes. The proposed building is designed in accordance with the local code, and, in the opinion of the structural engineer who designed the building, either meets or exceeds the required codes. The proposed building is designed in accordance with Section 6, American National Standards/American Society of Civil Engineering 7-88 (July 1990) "Minimum Design Loads for Buildings and Other Structures", and has a minimum basic wind speed of 110 miles per hour. The proposed building is designed so that the building and its components will not become airborne missiles. The plans for the windows and doors require that they meet the 110 miles per hour wind loads. The proposed building is made of concrete reinforced masonry, and does not have bricks or attached masonry which could detach in a storm and become airborne. There are no substantial walls or partitions to be constructed below the level of the first finished floor, except for the elevator and stairs, seaward of the CCCL. The walls on the first floor are frangible walls which are designed to resist the 110 mile per hour wind pressure, but they lie down or collapse into the erosion hole created under wave surge pressure. The frangible walls are made of 4-inch thick concrete with reinforcing rods inside them, and are cut into 4 foot by 4 foot panels. The Department of Environmental Protection requires that any walls constructed below the one-hundred year storm surge plus storm wave elevations be frangible walls. The structural design considered the hydrodynamic loads which would be expected under the conditions of a one-hundred year storm event. The calculation for wave forces on building foundations and building superstructures is based on minimum criteria and methods given in professionally recognized documents accepted by the Bureau of Coastal Engineering and Regulation with the Department. The structural design considered hydrostatic loads which would be expected under the conditions of maximum water height associated with a one- hundred year storm event. The calculations for hydrostatic loads considered the maximum water pressure resulting from a fully peaked, breaking wave superimposed on the design storm surge. Both free and confined hydrostatic loads were considered in the design calculations. Hydrostatic loads which are confined were determined using the maximum elevation to which the confined water would fully rise if unconfined. Vertical hydrostatic loads were considered as forces acting both vertically downward and upward; however, there is no action upward because the maximum water level is at midlevel of the first floor and does not reach the second floor. The structural design considered the hydrodynamic loads which would be expected under the conditions of a one-hundred year storm event. The calculations for hydrodynamic loads considered the maximum water pressure resulting from the motion of the water mass associated with a one- hundred year storm event. Full intensity loading was applied on all structural surfaces above the design grade which would effect the flow velocities, which are above the first floor and are not reached by the wave surge. The proposed building is elevated on, and securely anchored to, an adequate pile foundation in such a manner as to locate the building support structure above the design breaking wave crests or wave uprush as superimposed on the storm surge with dynamic wave set up of one-hundred year storm. The piling foundation is designed to withstand anticipated erosion, scour, and loads resulting form a one-hundred year storm, including wind, wave, hydrostatic and hydrodynamic forces, and the pile caps are located below the erosion line as indicated by the Department's information and graphs. The elevation of the soil surface used in the calculation design grade is less than that which would result from the anticipated beach and dune erosion due to the one-hundred year storm event. The erosion calculations for foundation design account for all vertical and lateral erosions and scour producing forces. The pile caps are set below the design grade which includes localized scour, and are designed for the erosion of soil during the one-hundred year storm event. The piles are driven to a penetration which achieves adequate bearing capacity taking into consideration the anticipated loss of soil above the design grade, based on information provided by the geotechnical engineer's recommendation and the Department's requirements. The design plans and specifications submitted as part of the permit application for the proposed Days Inn Tower are in compliance with the standards established in Rules 16B-33, Florida Administrative Code. Turtle Impacts There is a two prong test which the proposed structure must meet to determine if the proposed building would have an adverse impact on nesting sea turtles. First, the proposed structure must not occupy marine turtle habitat, and second, the proposed structure's lighting must be adequate to eliminate adverse impacts to marine turtles. The effects of pedestrian traffic or flashlights on the beach are not considered by the Department when reviewing a permit application for adverse impacts to the marine turtles. The proposed building is sited significantly landward of the nesting beach, which is evidenced by the 75-foot wide dune stretch; therefore, it is not anticipated that the structure will result in any direct mortality of any marine turtle, nor would the building result in the degradation of the marine turtle nesting habitat. The proposed seven story structure will not occupy marine turtle habitat. The permit requirement to do dune restorative work, proposed by the Department, enhances the marine turtle habitat by further building the dune and enhancing the dune. Although the turtles do not nest beyond the dune crest, the dune is an integral part of protecting the habitat. There is a potential that the building, due to its height, could enhance marine turtle nesting habitat by blocking out the ambient glow from the City of Cocoa Beach which would create a dark beach directly in front of the proposed structure which could attract nesting. The applicant submitted a lighting plan to the Department which complied with the guidelines that are established in the information form entitled "Assessment to reduce impacts to marine turtles for lighting to reduce adverse impacts associated with coastal lighting." There are two main components of the lighting plan associated with the proposed building: the parking lot lights and the structural lighting. The parking lot lighting is designed as low-level Ballard-style lighting which is only 48 inches above the grade and emits light in a downward direction which will not be directly visible from the beach. The parking lot lighting design is the type recommended by the Department for parking lots, and is a good lighting design. The Department also recommends that an applicant plant hedges or landscape features to block out parking lights. The applicant is proposing to plant hedges in front of the 18 parking spaces that are on the seaward side of the proposed building. The structural lighting plan does have lighting on the seaward facade of the proposed building, which is not recommended by the Department, but the lights are designed to eliminate or significantly reduce the impact to marine turtles. The lights consist of canister, shielded, down-casting lights on the balconies which house a yellow bug lamp which is less impactive to turtles, and which is acceptable to the Department. The Department issued an approval letter regarding the proposed building to the project engineer which contained permit conditions for the protection of the marine turtles in association with the project. The permit conditions are as follows: No construction, operation, transportation or storage of equipment or materials is authorized seaward of the existing chain link fence located approximately 175 feet seaward of the coastal construction control line. No temporary lighting of the construction area is authorized at any time during the marine turtle nesting season (March 1 through October 31). All permanent exterior lighting shall be installed and maintained as depicted in the approved lighting schematic. No additional permanent exterior lighting is authorized. c All windows and glass doors visible from any point on the beach must be tinted to a transmittance value (light transmission form inside to outside) of 45% or less through the use of tinted glass or window film. Pursuant to the Department's requirements, the proposed construction will not have an adverse impact on nesting sea turtles, their hatchlings, or their habitat. Vegetation Impacts The vegetation patch on the dune system is approximately seventy five feet wide under today's conditions, and is probably growing to some degree. The vegetation system is basically comprised of a low-level dune which is planted both naturally and artificially with indigenous, salt-tolerant type vegetation, and sea oats. The existing line of construction which the proposed building is set behind is well landward of the zone of indigenous vegetation. Special condition #4 contained in the permit issued by the Department requires the applicant to convert some of the existing sodded area between the vegetation limits and the proposed construction to plantings with indigenous vegetation, which will serve to enhance the dune system. The native beach vegetation will be adequately protected by the permit conditions, given the location of the construction. Local Government Approvals On June 3, 1992, the Cocoa Beach Board of Adjustment granted a variance to the CCCL to the 5500 North Corporation for construction of the proposed building. Challenges to decisions of the City's Board of Adjustment is to the circuit court. In the instant case, the time for challenging the decision of the Board has expired. The City of Cocoa Beach Planning Board has the authority to approve site plans for site specific construction. The City's Planning Board has the responsibility of ensuring that the site plan conforms with the Comprehensive Plan and to recommend changes, if needed, to the City Commission. On July 13, 1992, the Cocoa Beach Planning Board voted to approve the site plan for the proposed building submitted by the 5500 North Corporation. The decision of the Planning Board granting approval of the 5500 North Corporation's site plan showed part or all of the building was seaward of the CCCL. The Petitioners did not file an appeal of the Planning Board's decision with the City Commission. Nor did they challenge the Planning Board's action in the circuit court. The 5500 North Corporation was not required to apply to the city commission for an amendment to the Cocoa Beach Comprehensive Plan in order to permit the proposed hotel tower to be located in the designated high hazard area. On July 6, 1993, the Building Official issued a building construction permit to the 5500 North Corporation for the proposed building, which has been subsequently extended for an unknown period of time. There are no other permits or local government requirements which have not been met by 5500 North Corporation. The applicant submitted written evidence to the Department from the City of Cocoa Beach, who has jurisdiction over the project, which stated that the project does not contravene local setback requirements, or zoning and building codes.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that the Department of Environmental Protection issue Permit Number BE-760 to the 5500 North Corporation, subject to the conditions proposed in the proposed Final Order. DONE and ENTERED this 24th day of March, 1994, in Tallahassee, Florida. DANIEL M. KILBRIDE Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 24th day of March, 1994. APPENDIX The following constitutes my specific rulings, in accordance with section 120.59, Florida Statutes, on proposed findings of fact submitted by the parties. Petitioners' Proposed Findings of Fact Accepted in substance: paragraphs 1 (in part) 2, 3 (in part), 4, 5, 6, 7, 8 (in part), 10, 12 (in part), 13, 16 (in part), 17, 18, 19, 23 (in part), 24 (in part), 26 (in part), 27 (in part), 29 (in part), 31 (in part), 38 (in part), 49, 51, 63, 68 (in part), 69, 70, 71, 73 (in part). Rejected as against the greater weight of evidence: paragraphs 15 (in part), 16 (in part), 27 (in part), 46, 50 (in part), 82 (in part). Rejected as subsumed, argument or Conclusions of law: paragraphs 1 (in part), 14, 15 (in part), 16 (in part), 21, 23 (in part), 25, 26 (in part), 27 (in part), 28, 29 (in part), 30, 31 (in part), 32, 33, 34 (in part), 35, 36, 37 (in part), 38 (in part), 39, 40, 41, 42, 43, 44, 45, 47, 48, 50 (in part), 52, 56, 57, 58 (in part), 59 (in part), 61, 62, 64, 65, 66, 67, 68 (in part), 72 (in part), 73 (in part), 76, 77, 78, 79, 80, 81, 82 (in part), 83, 84. Rejected as irrelevant or immaterial: paragraphs 3 (in part), 5, 8 (in part), 9, 11, 12 (in part), 20, 22, 24 (in part), 34 (in part), 53, 54, 55, 58 (in part), 59 (in part), 60, 72 (in part), 74, 75. Respondent's Proposed Findings of Fact: Accepted in Substance: paragraphs 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16 (in part), 17, 18, 19, 20, 22, 23, 24, 25, 27, 29, 30, 35, 36 (in part), 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50, 51, 52, 53, 54, 55, 56, 57, 58, 59, 60, 62, 63, 64, 65, 66, 67, 68, 69, 70, 71, 72, 73, 74, 75, 76, 77, 78, 79, 80, 81, 82, 83, 84, 85, 86, 92, 93 (in part) 94, 95, 96, 97, 98, 99, 100, 101, 102, 104, 105, 106, 107, 108, 109, 110, 111, 112, 113, 114, 115, 116, 117, 118. Rejected as against the greater weight of evidence: paragraph 16 (in part). Rejected as subsumed, argument or irrelevant and immaterial: paragraphs 21, 26, 28, 31, 32, 33, 34, 36 (in part), 61, 87, 88, 89, 90, 91, 93 (in part), 103. COPIES FURNISHED: Virginia B. Wetherell, Secretary Department of Environmental Protection Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Kenneth Plante Department of Environmental Protection Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Hugh and Cora Harris (pro se) 208 Young Avenue Cocoa Beach, Florida 32931 Howard and Martha Crusey (pro se) 430 Johnson Avenue, Apartment #304 Cape Canaveral, Florida 32920 Carole Pope (pro se) 715 Rockledge Drive Rockledge, Florida 32955 Patricia and Eugene Wojewoda 830 North Atlantic Avenue Cocoa Beach, Florida 32931 Dana M. Wiehle, Esquire Assistant General Counsel Department of Environmental Protection Twin Towers Office Building 2600 Blair Stone Road, MS-35 Tallahassee, Florida 32399 Wilbur E. Brewton, Esquire Kelly Brewton Plante, Esquire Taylor, Brion, Buker & Greene 225 South Adams Street, Suite 250 Tallahassee, Florida 32301

Florida Laws (6) 120.52120.57120.68161.052161.05335.22
# 2
SAVE OUR SIESTA SANDS 2, INC.; PETER VAN ROEKENS; AND DIANE ERNE vs DEPARTMENT OF ENVIRONMENTAL PROTECTION, 17-001456 (2017)
Division of Administrative Hearings, Florida Filed:Sarasota, Florida Mar. 09, 2017 Number: 17-001456 Latest Update: Jun. 18, 2018

The Issue The issue to be determined in these consolidated cases is whether the U.S. Army Corps of Engineers (“Corps”) and the City of Sarasota (“City”) (sometimes referred to as “the Applicants”) are entitled to the proposed joint coastal permit, public easement, and sovereign submerged lands use authorization (referred to collectively as “the Permit”) from the Department of Environmental Protection (“DEP”) and the Trustees of the Internal Improvement Trust Fund to dredge sand from Big Sarasota Pass and its ebb shoal and place the sand on the shoreline of Lido Key.

Findings Of Fact The Parties Petitioner Siesta Key Association, Inc. is a Florida Not for Profit Corporation, with its principal place of business in Sarasota. The organization has approximately 1,425 members and represents the interests of those who use and enjoy Siesta Key’s beach and waters. A substantial number of its members have substantial interests in the use of the beach and adjacent waters. Petitioner Michael S. Holderness is a resident and property owner on Siesta Key. Mr. Holderness has substantial interests in the protection of his property and the use of the beach at Siesta Key and adjacent waters. Petitioner Save Our Siesta Sands 2, Inc. is a Florida Not For Profit Corporation, with its principal place of business in Sarasota. The organization has over 700 members and was formed in opposition to the current dredging proposal. A substantial number of its members have substantial interests in the use of the beach at Siesta Key and adjacent waters. Petitioners Peter van Roekens and Diane Erne are residents and property owners on Siesta Key. They have substantial interests in the protection of their properties and the use of the beach at Siesta Key and adjacent waters. Respondent City of Sarasota is an incorporated municipality in Sarasota County. It is a co-applicant for the Permit. Respondent Corps is the federal agency responsible for the Lido Key Hurricane and Storm Damage Reduction Project first authorized by Congress in 1970. Under this Project, the Corps has conducted periodic maintenance, inlet dredging, surveys, and bypassing to protect Lido Key’s shoreline. The Corps is a co-applicant for the Permit. Respondent DEP is the Florida agency having the power and duty to protect Florida’s air and water resources and to administer and enforce the provisions of chapters 161, 373, and 403, Florida Statutes, and rules promulgated thereunder in Titles 62 and 62B of the Florida Administrative Code, which pertain to the permitting of construction activities in the coastal zone and in surface waters of the state. DEP acts as staff to the Board of Trustees of the Internal Improvement Trust Fund. Intervenor Lido Key Residents Association is a Florida Not for Profit Corporation incorporated in 1980 and with its principal place of business in Sarasota. The organization represents the interests of regular users of Lido Key Beach. A substantial number of its members have substantial interests in the use of the beach at Lido Key and adjacent waters. The Project Area Lido Key is a 2.6-mile-long, manmade barrier island constructed in the 1920s, located on the Gulf of Mexico and within the City of Sarasota. North of Lido Key is New Pass, a navigation channel that separates Lido Key from Longboat Key. South of Lido Key is Big Sarasota Pass and the ebb shoal of the pass. Further south is Siesta Key, a natural barrier island. Sediment Transport In the project area, sand generally drifts along the various shorelines from north to south. There can be sand drift to the north during some storm events, currents, and tides, but the net sand drift is to the south. It is sometimes called “downdrift.” Whatever downdrift conditions existed 100 years ago, they were substantially modified by the creation of Lido Key. For decades, the shoreline of Lido Key has been eroding. Since 1964, the Corps has periodically dredged New Pass to renourish the shoreline of Lido Key. The City has also used offshore sand to renourish Lido Key. These renourishment projects have not prevented relatively rapid erosion of the shoreline. A 2.4-mile-long segment of the shoreline of Lido Key has been designated by DEP as “critically eroded.” The Big Sarasota Pass ebb shoal has been growing and now has a volume of about 23 million cubic yards (“cy”) of sand. The growth of the ebb shoal is attributable to the renourishment projects that have placed over a million cy of sand on Lido Key and Longboat Key. The growth of the ebb shoal has likely been a factor in the southward migration of the main ebb channel of Big Sarasota Pass, closer to the northern shoreline of Siesta Key. Most of the west-facing shoreline at Siesta Key has experienced significant accretion. It is unusually wide for a Florida beach. It was named the best (“#1”) beach in the United States by “Dr. Beach,” Dr. Steven Leatherman, for 2011 and 2017. The Project The federally-authorized Lido Key Hurricane and Storm Damage Reduction Project includes the use of New Pass as a supplemental sand source for renourishing Lido Key. However, the use of New Pass is the subject of separate DEP permitting. The project at issue in this proceeding only involves the renourishment of Lido Key and is named “Lido Key Beach Renourishment and Groins.” The Applicants conducted a study of the ebb shoal to determine whether it could be used as a permanent sand source to renourish Lido Key. The study consisted of an environmental feasibility study and an inlet management program for Big Sarasota Pass and New Pass with alternative solutions. The application for the Permit was a response to this study. The proposed sand source or borrow areas are three dredge “cuts.” Cuts B and D are within the ebb shoal. Cut C extends through the ebb shoal and partly into Big Sarasota Pass. Cut C generally follows an existing “flood marginal channel.” The sand from the cuts would be placed along the central and southern 1.6 miles of Lido Key to fill a beach “template.” The design width of the renourished beach would be 80 feet. The initial placement would be wider than 80 feet to account for erosion. The Permit would have a duration of 15 years. The Applicants’ intent is to initially place 950,000 cy of sand on Lido Key. After the initial renourishment, sand would be dredged from one or more of the three designated cuts about every five years to replace the sand that eroded away, and would probably be on the scale of about 500,000 cy. The numerical modeling of the proposed project assumed the removal of up to 1.3 million cy of sand from the three cuts. One of DEP’s witnesses testified that the Permit authorizes the removal of up to 1.732 million cy of sand. The record does not support that testimony. The Applicants did not model the effects of dredging 1.732 million cy of sand from the ebb shoal and pass. There is insufficient evidence in the record to support an authorization to remove more than 1.3 million cy of sand. Although the total volume of sand in the three cuts is 1.732 million cy, it is reasonable for the dimensions of the cuts and the proposed easement that is based on these dimensions to contain more material than is authorized to be removed, so as to provide a margin to account for less-than-perfect dredging operations. Therefore, it is found that the Permit authorizes up to 1.3 million cy of sand to be removed from the designated borrow areas. The findings of fact and conclusions of law in this Recommended Order that address the expected impacts of the proposed project are based on this finding. The Permit also authorizes the construction of two rubble mound groins at the southern end of Lido Key to stabilize the beach and lengthen the time between renourishment events. The groins are designed to be semi-permeable so that they “leak” sand. There are no seagrasses in the renourishment area and mostly scattered and thin patches of seagrass near the dredge cuts. The Permit requires mitigation for the potential direct impacts to 1.68 acres of seagrasses. To offset these impacts, the Applicants propose to create 2.9 acres of seagrass habitat. The seagrass habitat would be established at the Rookery at Perico Seagrass Mitigation Basin in Manatee County, about 16 miles north of Big Sarasota Pass. The Permit incorporates the recommendations of the Florida Fish and Wildlife Conservation Commission regarding protections for turtles, nesting shorebirds, and manatees. The Permit requires regular monitoring to assess the effects of the project, and requires appropriate modifications if the project does not meet performance expectations. Project Engineering The Corps’ engineering analysis involved three elements: evaluating the historical context and the human influences on the regional system, developing a sediment budget, and using numerical modeling to analyze erosion and accretion trends near the project site. A principal objective of the engineering design for the borrow areas, sand placement, and groins was to avoid adverse effects on downdrift, especially downdrift to Siesta Key. The Corps developed a sediment budget for the “no action” and post-project scenarios. A sediment budget is a tool used to account for the sediment entering and leaving a geographic study area. The sediment budgets developed by the Corps are based on sound science and they are reliable for the purposes for which they were used. The post-project sediment budget shows there would be minimal or no loss of sediment transport to Siesta Key. Petitioners did not prepare a sediment budget to support their theory of adverse impact to Siesta Key. Petitioners object to the engineering materials in the Permit application because they were not certified by a Florida registered professional engineer. DEP does not require a Florida professional engineer’s certification for engineering work submitted by the Corps. As explained in the Conclusions of Law, Florida cannot impose licensing conditions on federal engineers. Ebb Shoal Equilibrium Petitioners’ witness, Dr. Walton, developed a formula to estimate ebb shoal volume equilibrium, or the size that an ebb shoal will tend to reach and maintain, taking into account bathymetry, wave energy, tides, adjacent shorelines, and related factors. In an article entitled “Use of Outer Bars of Inlets as Sources of Beach Nourishment Material,” Dr. Walton calculated the ebb shoal equilibrium volume for the Big Sarasota Pass ebb shoal as between 6 and 10 million cy of sand. The ebb shoal has been growing and is now about 23 million cy of sand, which is well in excess of its probable equilibrium volume. The volume of sand proposed to be removed from the ebb shoal is only about six percent of the overall ebb shoal volume. Dr. Walton’s study of the use of ebb shoals as sand sources for renourishment projects supports the efficacy of the proposed project. Modeling Morphological Trends The Corps used a combined hydrodynamic and sediment transport computer model called the Coastal Modeling System, Version 4 (“CMS”) to analyze the probable effects of the proposed project. The CMS model was specifically developed to represent tidal inlet processes. It has been used by the Corps to analyze a number of coastal projects. Dr. Walton opined that the CMS model was inappropriate for analyzing this project because it is a two-dimensional model that is incapable of accounting for all types of currents and waves. However, a two-dimensional model is appropriate for a shallow and well-mixed system like Big Sarasota Pass. Dr. Walton’s lack of experience with the CMS model and with any three-dimensional sediment transport model reduced the weight of his testimony on this point. Petitioners contend that the CMS model was not properly calibrated or verified. Calibration involves adjustments to a model so that its predictions are in line with known conditions. Verification is the test of a model’s ability to predict a different set of known conditions. For calibrating the hydrodynamic portion of the model, the Corps used measurements of water levels and currents collected in 2006. The model showed a 90-percent correlation with water surface elevation and 87-percent correlation to velocity. Dr. Walton believes a model should exhibit a 95-percent correlation for calibration. However, that opinion is not generally accepted in the modeling community. Model verification, as described by Dr. Walton, is generally desirable for all types of modeling, but not always practical for some types of modeling. A second set of field data is not always available or practical to produce for a verification step. In this case, there was only one set of sea floor elevations available for verification of the CMS model. It is the practice of DEP in the permitting process to accept and consider sediment transport modeling results that have not been verified in the manner described by Dr. Walton. The Corps described a second calibration of the CMS model, or “test of model skill,” as an evaluation of how well the CMS model’s sediment transport predictions (morphological changes) compared to Light Detection and Ranging (“LIDAR”) data collected in 2004. The CMS model successfully reproduced the patterns of erosion and sediment deposition within the area of focus. Petitioners’ expert, Dr. Luther, testified that, over the model domain, the CMS model predictions differed substantially from LIDAR data and believes the discrepancies between the model’s predictions and the LIDAR data make the model’s predictions unreliable. Modeling sediment transport is a relatively new tool for evaluating the potential impacts of a beach renourishment project. Renourishment projects have been planned, permitted, and carried out for decades without the use of sediment transport models. Now, modeling is being used to add information to the decision-making process. The modeling does not replace other information, such as historical data, surveys, and sediment budgets, which were heretofore used without modeling to make permit decisions. Sediment transport is a complex process involving many highly variable influences. It is difficult to predict where all the grains of sand will go. Sediment transport modeling has not advanced to the point which allows it to predict with precision the topography of the sea floor at thousands of LIDAR points. However, the CMS model is still useful to coastal engineers for describing expected trends of accretion and erosion in areas of interest. This was demonstrated by the model’s accurate replication of known features of the Big Sarasota Pass and ebb shoal, such as the flood marginal channels and the bypassing bars. The CMS model’s ability to predict morphological trends assisted the Applicants and DEP to compare the expected impacts associated with alternative borrow locations on the ebb shoal and pass, wave characteristics, and sediment transport pathways. Together with other data and analyses, the results of the CMS model support a finding that the proposed dredging and renourishment would not cause significant adverse impacts. The Applicants extensively analyzed sediment transport pathways and the effects of alternative borrow areas on sediment transport to Siesta Key. Petitioners’ hypothesis is not supported by engineering studies of equivalent weight. The more persuasive evidence indicates that sediment transport to downdrift beaches would not be reduced and might even be increased because sediment now locked in the ebb shoal would reenter the sediment transport pathways. In addition, the proposed dredging may halt the southward migration of the main ebb channel of Big Sarasota Pass, and thereby reduce erosive forces on the interior shoreline of north Siesta Key. Wave Energy Petitioners assert that the proposed dredging would result in increased wave energy on Siesta Key because the diminished ebb shoal would no longer serve as a natural buffer against wave energy from storms. They conducted no studies or calculations to support this assertion. Because the proposed dredging would remove a small percentage of the total ebb shoal volume, the ebb shoal would remain a protective barrier for Siesta Key. Wave energy reaching the shorelines along Big Sarasota Pass or within Sarasota Bay would continue to be substantially reduced by the ebb shoal. The predicted increase in wave energy that would occur as a result of the project could increase the choppiness of waters, but would not materially increase the potential for wave-related erosion. Petitioners conducted no studies and made no calculations of their own to support their allegation that the project would significantly increase the potential for damage to property or structures on Siesta Key due to increased wave energy. To the extent that Petitioners’ expert coastal engineer opined otherwise, it was an educated guess and insufficient to rebut the Applicants’ prima facie case on the subject of wave energy. Groins Petitioners contend that the two proposed groins would adversely impact the beaches of Siesta Key because the groins would capture sand that would otherwise drift south and benefit Siesta Key. However, the preponderance of the evidence shows the groins would not extend into or obstruct the sand “stream” waterward of the renourished beach. The historic use of groins to capture downdrift resulted in adverse impacts to adjacent beaches. However, the use of groins in conjunction with beach renourishment to stabilize a renourished beach and without obstructing downdrift is an accepted practice in coastal engineering. The proposed groins would not obstruct longshore sediment transport and, therefore, would not interfere with downdrift to Siesta Key. Public Interest - General Section 373.414(1) requires an applicant to provide reasonable assurance that state water quality standards will not be violated, and reasonable assurance that a proposed activity is not contrary to the public interest. However, if the proposed activity significantly degrades or is within an Outstanding Florida Water (“OFW”), the applicant must provide reasonable assurance that the proposed activity will be clearly in the public interest. Sarasota Bay, including Big Sarasota Pass and portions of Lido Key, have been designated as an OFW. Therefore, the Applicants must demonstrate that the proposed project is clearly in the public interest. In determining whether an activity is clearly in the public interest, section 373.414(1)(a) requires DEP to consider and balance seven factors: Whether the activity will adversely affect the public health, safety, or welfare or the property of others; Whether the activity will adversely affect the conservation of fish and wildlife, including endangered or threatened species, or their habitats; Whether the activity will adversely affect navigation or the flow of water or cause harmful erosion or shoaling; Whether the activity will adversely affect the fishing or recreational values or marine productivity in the vicinity of the activity; Whether the activity will be of a temporary or permanent nature; Whether the activity will adversely affect or will enhance significant historical and archaeological resources under the provisions of section 267.061; and The current condition and relative value of functions being performed by areas affected by the proposed activity. DEP determined that the project is clearly in the public interest because it would improve public safety by providing protection to Lido Key upland structures from storm damage and flooding, protect and enhance wildlife habitat, and provide beach-related recreational opportunities; and it would create these public benefits without causing adverse impacts. Public Interest - Safety Petitioners contend that the proposed project would adversely affect public health, safety, welfare, or the property of others because it would interrupt downdrift and substantially reduce the storm protection provided by the ebb shoal. As found above, the preponderance of the evidence does not support this contention. Public Interest - Conservation of Fish and Wildlife Petitioners contend that the proposed project would adversely affect the conservation of fish and wildlife, including endangered or threatened species. The Permit application materials provided evidence that the proposed project would have no effects, or only minimal temporary effects, on water quality, temperature, salinity, nutrients, turbidity, habitat, and other environmental factors. That was sufficient as a prima facie showing that the project would not adversely affect the conservation of fish and wildlife because, if environmental factors are not changed, it logically follows that there should be no adverse impacts to fish and wildlife. Therefore, as explained in the Conclusions of Law, the burden shifted to Petitioners to present evidence to show that adverse effects to fish and wildlife would occur. It was not enough for Petitioners to simply contend that certain fish species were not adequately addressed in the application materials. With the exception of Dr. Gilmore’s field investigation related to the spotted seatrout, Petitioners conducted no studies or field work of their own to support their allegations of adverse impacts to fish and wildlife. Dr. Gilmore discovered that spotted seatrout were spawning in Big Sarasota Pass. Such spawning sites are not common, are used repeatedly, and are important to the conservation of the species. Spotted seatrout spawn from April through September. The record does not show that the Florida Fish and Wildlife Conservation Commission, the U.S. Fish and Wildlife Service, or the National Marine Fisheries Service were aware that Big Sarasota Pass was a spawning area for spotted seatrout, or considered this fact when commenting on the project. The spotted seatrout is not a threatened or endangered species, but DEP is required to consider and prevent adverse impacts to non-listed fish species, as well as recreational fishing and marine productivity. If the proposed project would destroy a spotted seatrout spawning area, that is a strong negative in the balancing of public interest factors. The Applicants do not propose mitigation for adverse impacts to spotted seatrout spawning. Seagrass sites close to the spawning area are used by post-larval spotted seatrout for refuge. The likely seagrass nursery sites for seatrout spawning in Big Sarasota Pass are depicted in SOSS2 Exhibit 77. The proposed seagrass mitigation at the Perico Rookery Seagrass Mitigation Basin, over 16 miles away, would not offset a loss of this refuge function because it is not suitable as a refuge for post-larval spotted seatrout. The spawning season for spotted seatrout occurs during the same months as turtle nesting season, and DEP argued that the turtle protection conditions in the Permit to limit lighting and prohibit nighttime work, would also prevent adverse impacts to the spotted seatrout. However, spotted seatrout spawning is also threatened by turbidity and sedimentation in the spawning area and adjacent seagrasses. The spotted seatrout spawning area is in the area where dredge Cut B is located. If Cut B were dredged during the spawning season, it would likely disrupt or destroy the spawning site. Reasonable assurance that the proposed project would not disrupt or destroy the spawning site requires that Cut B not be dredged during the spawning season. Seagrasses that are likely to provide refuge to post- larval seatrout are near the most eastern 1,200 feet of Cut C. Reasonable assurance that the proposed project would not disrupt or destroy the refuge function requires that the most eastern 1,200 feet of cut C not be dredged during the spawning season. In summary, the proposed project would adversely affect the conservation of fish and wildlife unless dredging was restricted during the spotted seatrout spawning season, as described above. Public Interest – Navigation, Flow of Water, and Erosion Petitioners contend that the proposed project would adversely affect navigation, the flow of water, and would cause harmful erosion to Siesta Key, but Petitioners conducted no studies or calculations to support this assertion. The preponderance of the evidence shows that no such adverse impacts would occur. Public Interest – Recreational Values Petitioners contend that the proposed project would adversely affect fisheries and associated recreation because of harm to spotted seatrout and other fish species. As found above, the preponderance of the evidence shows the project would adversely affect the spotted seatrout, an important recreational fish species, unless dredging was restricted during the spawning season. Public Interest - Value of Functions Petitioners contend that the proposed project would adversely affect the current condition and relative value of functions being performed by areas affected by the proposed project because dynamic inlet system would be disrupted. As found above, the preponderance of the evidence shows the project would not adversely affect the coastal system. However, it would adversely affect the spotted seatrout spawning and refuge functions provided by Big Sarasota Pass unless dredging was restricted during the spawning season. Mitigation If a balancing of the public interest factors in section 373.414(1)(a) results in a determination that a proposed project is not in the public interest, section 373.414(1)(b) provides that DEP must consider mitigation offered to offset the adverse impacts. Although the Perico Rookery at Seagrass Mitigation Basin is within the OFW and the same drainage basin, it does not fully offset the adverse impacts likely to be caused by the proposed project. The mitigation would not offset the loss of spotted seatrout spawning and refuge functions. The mitigation for the loss of spotted seatrout spawning and refuge functions is unnecessary if the impacts are avoided by restricting dredging during the spawning season as described above. Design Modifications Petitioners contend that the Applicants did not evaluate the alternative of taking sand from offshore borrow areas for the renourishment. The record shows otherwise. Furthermore, as explained in the Conclusions of Law, the Applicants were not required to address design modifications other than alternative locations for taking sand from the ebb shoal and Big Sarasota Pass. Consistency with the Coastal Zone Management Program Petitioners contend that DEP failed to properly review the Permit for consistency with the Florida Coastal Zone Management Program (“FCZMP”), because DEP failed to obtain an affirmative statement from Sarasota County that the proposed project is consistent with the Sarasota County Comprehensive Plan. The State Clearinghouse is an office within DEP that coordinates the review of coastal permit applications by numerous agencies for consistency with the FCZMP. It is the practice of the State Clearinghouse to treat a lack of comment by an agency as a determination of consistency by the agency. With respect to this particular project, the State Clearinghouse provided a copy of the joint coastal permit application to the Southwest Florida Regional Planning Council (“SWFRPC”) for comments regarding consistency with local government comprehensive plans. SWFRPC submitted no comments. In a letter dated June 26, 2015, the State Clearinghouse reported to the Corps that “at this stage, the proposed federal action is consistent with the [FCZMP].” In a written “peer review” of the proposed project produced by the Sarasota Environmental Planning Department in October 2015, some concerns were expressed, but no mention was made of inconsistency with the Sarasota County Comprehensive Plan. Sarasota County sent a letter to DEP, dated August 24, 2016, in which it requested that the Corps prepare an Environmental Impact Statement (“EIS”) for the project. Sarasota County did not indicate in its letter to DEP that the proposed project is inconsistent with any policy of the Sarasota County Comprehensive Plan. Petitioners assert that the proposed project would be inconsistent with an environmental policy of the Sarasota County Comprehensive Plan that Petitioners interpret as prohibiting the proposed dredging. The record contains no evidence that Sarasota County believes the proposed project is inconsistent with this particular policy or any other policy of its comprehensive plan.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that DEP issue a final order approving the proposed agency actions, but only if the joint coastal permit is modified to prohibit dredging operations in Cut B and the most eastern 1,200 feet of Cut C during April through September. If this modification is not made, it is recommended that the proposed agency actions be DENIED; and The joint coastal permit be modified to clarify that it authorizes the removal of up to 1.3 million cy of sand. DONE AND ENTERED this 8th day of May, 2018, in Tallahassee, Leon County, Florida. S BRAM D. E. CANTER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 8th day of May, 2018. COPIES FURNISHED: Kirk Sanders White, Esquire Florida Department of Environmental Protection Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 (eServed) Kent Safriet, Esquire Hopping Green & Sams, P.A. Post Office Box 6526 Tallahassee, Florida 32314 (eServed) Alexandrea Davis Shaw, Esquire City of Sarasota Room 100A 1565 1st Street Sarasota, Florida 34236 John R. Herin, Jr., Esquire Gray Robinson, P.A. Suite 1000 401 East Las Olas Boulevard Fort Lauderdale, Florida 33301 (eServed) Eric P. Summa U.S. Army Corps of Engineers Post Office Box 4970 Jacksonville, Florida 32232 Martha Collins, Esquire Collins Law Group 1110 North Florida Avenue Tampa, Florida 33602 (eServed) Thomas W. Reese, Esquire 2951 61st Avenue South St. Petersburg, Florida 33712-4539 (eServed) Richard Green, Esquire Lewis, Longman & Walker, P.A. Suite 501-S 100 Second Avenue South St. Petersburg, Florida 33701 (eServed) Kevin S. Hennessy, Esquire Lewis, Longman & Walker, P.A. Suite 501-S 100 Second Avenue South St. Petersburg, Florida 33701 (eServed) Christopher Lambert, Esquire United States Army Corps of Engineers 701 San Marco Boulevard Jacksonville, Florida 32207 (eServed) Lea Crandall, Agency Clerk Department of Environmental Protection Douglas Building, Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 (eServed) Noah Valenstein, Secretary Department of Environmental Protection Douglas Building 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 (eServed) Robert A. Williams, General Counsel Department of Environmental Protection Legal Department, Suite 1051-J Douglas Building, Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 (eServed)

Florida Laws (11) 120.52120.569120.57120.68163.3194267.061373.414373.427373.428403.412403.414
# 4
WALTON COUNTY AND W. L. "BILLY" MCLEAN vs. DEPARTMENT OF NATURAL RESOURCES, 82-000132 (1982)
Division of Administrative Hearings, Florida Number: 82-000132 Latest Update: Jul. 30, 1982

Findings Of Fact Marvel O. Warren and his brother Dan own a parcel of beachfront property in Walton County, south of State Road 30A (SR30A) near Seagrove Beach. Like Mr. Warren, the other intervenors own beachfront in the area, which lies in County Commission District Five. In 1954, before the Warrens built their house landward of the dunes, no road ran toward the beach from SR30A. Construction traffic to the house site beat down a path, however. In Walton County, each county commissioner is responsible, within the district he represents, for road maintenance and, on existing county right-of- way, for construction of new roads. DNR's Exhibit No., 7; Testimony of Owens. Expenditures in excess of $500 for materials beyond what the county has stockpiled require approval by the full commission, however. Testimony of Owens. FIRST ROAD BUILT Albert Gavin of Freeport was county commissioner for District Five when, in 1958 or 1959, he caused a red clay road to be built from SR30A southerly along the eastern edge of the Warren property over sand dunes and onto the beach to within 20 or 30 feet of the water's edge. During Mr. Gavin's tenure, the county owned a borrow pit and kept no records of how much clay was placed where. (No records of the quantity of clay deposited on the beach at any time were offered in evidence at the hearing.) Fishermen used the road to launch boats into the Gulf of Mexico. Except for any portion that may have extended onto sovereignty land, the road lay on county-owned right-of-way. UPLAND SEGMENT PERMANENT The clay road landward of the sand dunes leading along the eastern edge of the Warren property to SR30A (the upland road) has been consistently maintained and in existence since it was originally built. The upland road ends at the bluff line, which is practically congruent with the coastal construction control line at that point on the coast. DNR's Exhibit No. 4; Testimony of Hill. At some time between 1960 and 1969, also landward of the subsequently established coastal construction control line, a clay parking lot was built adjacent to the upland road. BEACH SEGMENTS EVANESCENT Whenever clay has been placed on the beach, seaward of the crest of the landwardmost sand dune, the gulf has washed it away. Many clay roads at the site did not last the summer. Virtually no clay deposit has lasted longer than a full year. One attempt after another to construct a clay road seaward of the sand dunes (the beach segment) has failed. Witnesses testified that the sun bleached the red clay and that wind covered it with white sand but wave action has been the clay's principal nemesis. When Harold C. Lucas was commissioner for District Five from March, 1968, to January, 1969, no clay was deposited on the beach and there was no beach segment. Except for three months in 1975 when Van Ness R. Butler, Jr., of Grayton Beach, served as District Five's county commissioner, Conley Martin of Portland represented the district from 1969 to 1976. As county commissioners, both of these men directed clay to be placed on the beach at various times. COASTAL CONSTRUCTION CONTROL LINE ESTABLISHED A beach segment was in existence at the time the coastal construction control line was established, and recorded, on June 4, 1975, although the beach segment that then existed went straight from the foot of the sand dune toward the edge of the gulf, instead of veering east like the new; longer beach segment built last September. THEN EXISTING ROAD DESTROYED, REPLACED In September of 1975, Hurricane Eloise removed not only the beach segment of the road but much of the beach, including the dunes themselves. As road foreman for District Five at the time, Robert N. Budreau used a road grader and other equipment to fill a large hole between the Warren house and the sand dune and to cover over broken toilets and other debris with a mixture of sand and yellow clay. After the filling, a roadway was constructed with the same sand and clay mix, extending about 25 feet seaward of the dunes along a line perpendicular to the gulf shore. REPLACEMENT ROAD RECLAIMED BY ELEMENTS In 1976, Freddie M. Bishop was elected county commissioner for District Five. After the beach segment built by Mr. Budreau washed out, at least one constituent, Gene Wesley, asked Mr. Bishop to replace it, but Mr. Bishop broke with sisyphean tradition, and declined to place any clay on the beach, or otherwise attempt to reconstruct or replace the beach segment. By the time petitioner McLean succeeded Bishop as commissioner for District Five, the beach segment had been completely obliterated. The end of the upland road continued, however, to be one of some half-dozen points of access for four-wheel drive vehicles to Walton County's gulf beaches. Commissioner Bishop did cause two truckloads of oyster shells to be deposited on the "hump" of the landward sea dune, on or near the bluff line. NEW BEACH SEGMENT In response to constituents' requests, Mr. McLean ordered a new road built. He caused clay and gravel to be placed and compacted seaward of the coastal construction control line by county workmen and machinery, including some "borrowed" for the purpose from colleagues on the Walton County Commission. Built without a DNR permit in September of 1981, this new beach segment extends 180 feet seaward of the coastal construction control line and takes an unprecedented veer to the east. The only preexisting foundation for the new beach segment was the beach itself. Like Commissioner Anderson, Commissioner W. F. Miles "lent" county trucks he had charge of to respondent McLean, but Mr. Miles did not know in advance that Mr. McLean intended to use them to build a road on the beach. Commissioners Matthews, Miles, and Owens were aware of the existence of the coastal construction control line in Walton County and, in a general way, of DNR permitting requirements and procedures, including the fact that the County Commission itself acts on certain coastal construction applications. Commissioners Anderson and McLean did not testify on these matters. DNR has issued no permit for anything like the new beach segment at any time since the coastal construction control line wad established. DNR has no record of any inquiry concerning the new beach segment by or on behalf of petitioners McLean or Walton County, before the new beach segment was built. There was no showing that Mr. McLean sought legal advice before ordering construction of the new beach segment. Paragraphs 1 through 8 of DNR's "Final Order," as amended at the final hearing and set forth above, have been established by stipulation of the parties. The hearing officer has had the benefit of posthearing submissions, including proposed findings of fact, filed by all parties. Proposed findings have been adopted, in substance, where relevant, except when unsupported by appropriate evidence.

Recommendation Upon consideration of the following, it is RECOMMENDED: That DNR order petitioner Walton County to remove the new beach segment seaward of the Walton County Coastal Construction Control Line within 30 days of entry of a final order. That DNR remove the new beach segment seaward of the Walton County Coastal Construction Control Line itself, in the event of petitioner Walton County's noncompliance with the final order; and take steps to recover the cost from petitioner Walton County. That DNR impose no civil or administrative fine against petitioner W. L. "Billy" McLean. DONE AND ENTERED this 30th day of July, 1982, in Tallahassee, Florida. ROBERT T. BENTON, II Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 30th day of July, 1982. COPIES FURNISHED: George Ralph Miller, Esquire Post Office Box 687 DeFuniak Springs, Florida 32433 W. Dennis Brannon, Esquire Post Office Box 1503 Fort Walton Beach, Florida 32549 Deborah A. Getzoff, Esquire Department of Natural Resources 3900 Commonwealth Boulevard Tallahassee, Florida 32303 M. Stephen Turner, Esquire Post Office Drawer 591 Tallahassee, Florida 32303 Elton J. Gissendanner Executive Director Department of Natural Resources 3900 Commonwealth Boulevard Tallahassee, Florida 32303

Florida Laws (3) 120.57161.053161.054
# 5
AUDREY G. DICKASON vs TOM TONA AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 91-003872 (1991)
Division of Administrative Hearings, Florida Filed:Shalimar, Florida Jun. 25, 1991 Number: 91-003872 Latest Update: Oct. 22, 1991

Findings Of Fact The applicant, Tom Tona, owns the mortgage on the island consisting of Lots 1 and 2, Block 8, Elliots Point Subdivision, Fort Walton Beach, Florida. Mr. Tona has taken steps to perfect his ownership of the island and holds a property interest sufficient to afford him standing to apply for a permit. Elliots Point Subdivision is a residential subdivision development surrounding a lagoon which opens into Santa Rosa Sound in Fort Walton Beach, Florida. The island is located in the lagoon opening to Santa Rosa Sound. It has a large area of wetlands on the north shore. The wetlands function as a habitat for wildlife in the area. Water depths surrounding the island are shallow. The island currently acts as a barrier island for the property located on the shore of the lagoon. The barrier effect of the island helps to prevent the lagoon shore from erosion which would be caused by the wave action in the sound. However, the island, itself, is rapidly eroding due to the same wave action it protects the lagoon shore from. The evidence clearly demonstrated that unless this erosion is stopped the island will completely wash away along with the habitat, including wetlands, it now provides to wildlife and no longer protect the lagoon shore from the erosion it otherwise would experience without the presence of the island. The subdivision appears to be almost completely developed along the lagoon with single family dwellings. A canal consisting of two vertical seawalls runs in between the island and Elliots Point. The canal leads to a public boat ramp within the subdivision. The vertical sea wall of the canal along with the boats that pass through it is causing erosion to occur within the wetlands adjoining the seawall. It is this 55 foot area of the wetlands that Respondent proposes to construct part of the riprap revetment. Petitioner, Audrey Dickason, owns property on the far side of the lagoon from the island. Petitioner's property does not adjoin the island, but is close enough to the island to be within view of the island. On March 6, 1991, the applicant submitted an application to the Department of Environmental Regulation for a dredge and fill permit to construct a riprap revetment around the entire island. This was Mr. Tona's first application with the Department and at the time of filing Mr. Tona was very inexperienced in completing dredge and fill applications. The application was completed to the best of Mr. Tona's knowledge. Additionally, as happens with any form document, this application did not entirely fit the fact that this was an island project and the type of property interest Mr. Tona was asserting over the island. The application as originally filed did not list any adjacent property owners. Mr. Tona did not believe there were any adjacent property owners since an island was involved. Regardless of whether Mr. Tona should have listed any property owners of the subdivision, the failure to list any such property owners was not done to deceive or defraud the Department or the island's neighbors and in reality had no impact on the notification of parties who may have been interested in Mr. Tona's application. The owners of the property directly across from the island testified at the hearing and voiced their concerns to the Department during the processing of the application. Moreover, as indicated earlier, Petitioner's property does not adjoin the island. Since Petitioner's property does not adjoin the island, she was not entitled to be listed in Mr. Tona's application for the dredge and fill permit. The evidence simply did not establish that this debatable issue justifies the denial of Mr. Tona's application for a dredge and fill permit. The application filed by Mr. Tona also had the box indicating that he owned the property checked. The other box which could have been checked was that he would acquire an interest in the property. Neither box quite fit Mr. Tona's circumstances since he already had an interest in the property. The Department advised that it would be sufficient to check the ownership box and attach a copy of the mortgage assignment which gave Mr. Tona his interest. Mr. Tona followed the Department's advice. Again, the information as to ownership was not submitted to deceive or defraud the Department or the island's neighbors and in reality had no impact on the application process. In fact, the necessary information to determine Mr. Tona's interest was submitted to the Department. Again, there is nothing in the information submitted by Mr. Tona in the application which would justify denying that application as it has since been amended. As indicated above, after consulting with the Department, Mr. Tona amended his application so that the riprap revetment would only be constructed on a 55 foot strip along the northwest corner of the island immediately adjacent to the vertical seawall and on a 322 foot stretch of the island shore, beginning at the intersection of the vertical seawall and the southwest shore of the island and extending along the shore of the island to the edge of the wetland marsh on the north side of the island. The riprap would consist of clean limestone and would extend into state waters. The fill would not impede the flow of water or cause harmful erosion or shoaling. In fact, the purpose of the revetment is to stop the rapid erosion of the island which is currently taking place and preserve the wetland habitat which exists on the island. The evidence did not demonstrate that the type fill the applicant intends to use in the construction of the revetment would cause any significant pollution or water quality problems or adversely affect fish or wildlife. The evidence demonstrated that the placement of the fill would create more habitat for fish and wildlife. The revetment is intended to be a permanent structure. After evaluating the application for consistency with the relevant pollution control standards, the Department determined that the proposed revetment met departmental standards for water quality and the public interest and issued an Intent to Issue with a draft permit authorizing the construction of the riprap revetment described above subject to several standard permit conditions. The modifications of the application along with the permit conditions provide reasonable assurances that the project will not violate water quality standards as provided in Section 403.918, Florida Statutes. Additionally, the historical evidence the Department has gained through observing the impact of other riprap revetments in a similar environment on water quality provides strong support for the above conclusion and in itself is a reasonable assurance that water quality standards will not be adversely impacted by the construction of this riprap revetment. For similar reasons, the evidence demonstrated that the proposed revetment would not be contrary to the public interest. In essence, the evidence demonstrated that the revetment would not adversely impact the public health, safety, welfare or property of others, the current condition or relative value of the area surrounding the proposed project, the conservation of fish or wildlife and their habitats, or cause harmful erosion or shoaling, or involve historical or archaeological resources. In fact, the evidence demonstrated that the only effect on the environment the proposed revetment would cause would be a beneficial effect. Petitioner's fear that the grant of this permit will allow Mr. Tona to build a house on the island and thereby destroy her view is not the type of factor which may be considered in determining whether a dredge and fill permit should be granted or denied. See Miller v. Department of Environmental Regulation, 504 So.2d (Fla. 1st DCA 1988). Petitioner's concerns for the revetment's affect on the wildlife of the area were not established by any evidence. The evidence did demonstrate that Petitioner's concerns for the wildlife using the island were simply feinted by her and are belied by the fact that if the island is not preserved from erosion there will be no habitat for any wildlife to use once the island erodes away. Based on all the evidence, Mr. Tona's application for a dredge and fill permit to construct a riprap revetment should be granted.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Environmental Regulation enter a Final Order issuing a dredge and fill permit to construct a riprap revetment as sought by Tom Tona in his permit application as amended and subject to the permit conditions contained in the Department's Intent to Issue. DONE and ENTERED this 23rd day of September, 1991, in Tallahassee, Florida. DIANE CLEAVINGER Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 Filed with the Clerk of the Division of Administrative Hearings this 23rd day of September, 1991. APPENDIX TO RECOMMENDED ORDER CASE NO. 91-3872 The facts contained in paragraph 1 of Petitioner's Proposed Findings of Fact are adopted in substance, in so far as material. The facts contained in paragraphs 3 and 4 of Petitioner's Proposed Findings of Facts are subordinate. The facts contained in paragraphs 6, 7, 8 and 9 of Petitioner's Proposed Findings of Facts were not shown by the evidence. The facts contained in paragraph 5 of Petitioner's Proposed Findings of Fact are immaterial. The facts contained in paragraph 2 of Petitioner's Proposed Findings of Fact are adopted in substance, except for the finding relating to notice which was not shown by the evidence. The facts contained in paragraphs 1, 2, 3, 4, 5, 6, 7, 8, 9 and 10 of Respondent's Proposed Findings of Fact are adopted in substance, in so far as material. COPIES FURNISHED: Michael Mead P.O. Drawer 1329 Fort Walton Beach, Florida 32549 William Stone P.O. Drawer 2230 Fort Walton Beach, Florida 32549 Candi Culbreath Assistant General Counsel Department of Environmental Regulation 2600 Blairstone Road Tallahassee, Florida 32399-2400 Daniel H. Thompson General Counsel 2600 Blairstone Road Tallahassee, Florida 32399-2400 Carol Browner, Secretary Twin Towers Office Building 2600 Blairstone Road Tallahassee, Florida 32399-2400

Florida Laws (1) 120.57
# 6
JACK G. NICHOLS vs. DEPARTMENT OF NATURAL RESOURCES, 84-002945 (1984)
Division of Administrative Hearings, Florida Number: 84-002945 Latest Update: Sep. 25, 1985

Findings Of Fact The Petitioner, Dr. Jack G. Nichols, is a resident of the State of Illinois. He and his parents have, for many years, owned property on Dog island, a barrier island in Franklin County, Florida. Dr. Nichols owns Lots 107 and 108 on Dog Island, and has for many years entertained plans of building a beach house on each lot, consisting of a single-family residence for himself on Lot 108 and such a house on Lot 107 for his parents. Dr. Nichols has the habit of visiting Dog island to inspect his property on his vacations and has done so from time to time prior to April, 1984. Over the years he conceived of the general type of house he wished to build and determined prior to April, 1984 to locate the houses landward of the then-existing Coastal Construction Control Line. Pursuant to Chapter 161, Florida Statutes, the Department of Natural Resources undertook to survey and delineate a new Coastal Construction Control Line for Franklin County. The location of that line is described in Rule 16B- 26.14, F.A.C. and the new jurisdictional line became effective on April 30, 1984. Dr. Nichols came to Dog Island for his vacation in April, 1984, at which time he learned for the first time that the Department of Natural Resources had adopted the new Coastal Construction Control Line. After hearing of this new jurisdictional boundary from other property owners on the island, he sought to determine how that newly-defined boundary would affect his property and his plans for constructing a beach house. He observed aerial photographs depicting the Coastal Construction Control Line which would take effect April 30, 1984. He determined that the sites he had selected for the houses on his lots would be seaward of the new control line, as opposed to the preexisting line which he had taken into account in selecting his original home site. He also learned that if the houses he envisioned were under construction upon the effective date of the new Coastal Construction Control Line then he would be able to proceed with their construction without having to obtain a permit from the Department of Natural Resources. The Petitioner had not originally intended to construct the houses on his lots as early as April, 1984, but he became concerned that if he did not commence construction prior to the effective date of the new control line, he would not be able to place the houses at the location he had previously planned for. Thus, he took steps to retain a contractor and commence construction immediately. The Petitioner contacted Mr. William A. Shults, a contractor with experience building in the coastal areas of Franklin County. Mr. Shults was available and able to undertake construction activities and the two parties entered into a contract calling for construction of a beach house for both lots on approximately April 20, 1984. Mr. Shults immediately had necessary engineering work accomplished, had plans drafted for the structures and retained a construction crew. He cleared sufficient area on both lots to accommodate the residences and thereafter, on April 26, obtained a building permit for the structures. Materials were delivered to the island by landing craft on April 26 and 27, 1984. Mr. Shults also had a truck equipped with an auger or drilling equipment transported to the island and placed on the job site on or before April 27, 1984. The plans called for construction of the houses with a piling or pole foundation, so that the houses would be constructed above the specified flood levels. The poles and other materials necessary for construction of the foundation had all been delivered by April 27, 1984. The foundation lines were marked, the corner "batter boards" placed and other minor site preparation accomplished. The holes for the piling were to have been drilled on Saturday, April 28 but the trucks with the auger machine aboard, suffered a broken axle prior to its being positioned on Dr. Nichols' lots so that it was impossible to get the auger machine to the lots on April 28 or 29. Mr. Shults and his crew attempted to pull the truck to the site, but the difficulty of the terrain rendered that impossible. There was one other piece of auger equipment on the island, but its owner was engaged in construction activity with it at the time. That person agreed to bring his machine to the site on April 29 and begin augering and placing the poles for the pilings. His work became behind schedule however, and his machine was still involved in construction activity at his own site and could not be brought to Petitioner's site on that day. Mr. Shults, upon learning that the augering machine would not be available when needed, began commencing hand-digging of the pilings with post hole diggers on April 29. This method was a slow and laborious process because the holes had to be excavated much deeper than the length of the post-hole diggers. As a result, when the hole was dug as deep as the post-hole digger could reach from the surface of the ground, a hole had to be dug alongside the piling foundation hole so that a crew member could stand down in that hole and thus dig the piling hole deeper, handing the post-hole diggers with each load of dirt up to another crew member on the surface to dump, who would then hand the post-hole diggers back to the lower-placed crew member. This made the process of digging the foundation piling holes much slower than the use of the auger equipment. In this manner, however, Shults succeeded in digging four foundation holes on Lot 105. At that point, the augering machine arrived on the site and four piling holes were dug and the pertinent poles placed in them on Lot 107 as well. Throughout this construction process, Mr. Shults' crew was working on both foundations at one time. This allowed for less costly construction due to the efficiency of undertaking the same kind of work on two structures with the same crew at the same time. Since the two lots and construction sites adjoined each other, one crew could efficiently be used for both construction sites in an economic fashion. On April 30, Shults' construction crew proceeded to work on the structure on Lot 108 to further secure and place foundation posts. The four pilings placed in the holes on Lot 107 the day before remained in place. The construction crew and most of its equipment, and most construction work, was proceeding on Lot 108 merely because of the order of Mr. Shults to his crew to finish placing the foundation posts on that lot first, on that day. During the morning of that day, representatives of the Department arrived on the site and advised Mr. Shults that the construction activities appeared to be illegal and seaward of the Coastal Construction Control Line. They advised him that any further activity of that type would be undertaken at his and the lot owner's risk and expense. Mr. Shults thus ceased activities on both lots for a time, but during the following week, after discussing the dispute with certain Department employees, arrived at the opinion that the owner's construction activities had achieved grandfather status and that no permit from the Department would be required. He thus undertook to finish placing the foundation pilings on both lots. All the foundation pilings were installed on both lots by the end of the second week of May, 1984. Mr. Shults then contacted Dr. Nichols by telephone in Illinois informing him about the progress of the job, including the height of the piling. During this conversation Dr. Nichols became concerned that the pilings on Lot 107 did not project above the surface of the ground as far as he had anticipated, thus obstructing his view of the Gulf of Mexico from the beach house which would be constructed on top of the pilings. The view would be obstructed by the existing sand dune which Dr. Nichols had not wanted to disturb, hence locating his house in the more landward position at issue. In order to provide the desired view of the Gulf over the intervening sand dune, Dr. Nichols instructed Mr. Shults to replace the existing pilings on Lot 107 with longer ones. Mr. Shults purchased new pilings, had them delivered to the site, removed the original poles and installed the new ones in their place in the same holes, including the four holes that were dug prior to the effective date of the Coastal Construction Control Line. Dr. Nichols and Mr. Shults established that the original poles had been placed with the intention that they would be the permanent foundation for the house and no decision was contemplated nor made concerning their removal and replacement with the longer poles until after the foundation was fully constructed. In any event, by its letter of May 21, 1984, advising Dr. Nichols of the alleged violation of the Coastal Construction Control Line, the Department made a "free-form" determination that the construction activities on Lot 107 before April 30, 1984, were not sufficient to confer "grandfathered" status and that the activities were illegal unless a permit was obtained. The subject petition was filed and this proceeding ensued. It is true that Dr. Nichols' original intent was not to commence construction of the beach houses as soon as he did in April, 1984 and that he only began construction at that earlier time when he learned of the impending effective date of the new Coastal Construction Control Line which would require him to obtain a permit before constructing the houses at the sites he had previously selected. However, it is equally true that Dr. Nichols' bona fide intention when he retained Mr. Shults to commence construction was to not merely clear the site and place pilings and then construct the houses at some indefinite later time, but rather to commence construction and pursue construction activities on an ongoing, uninterrupted basis through to completion of both houses on both lots. If the Department had not intervened with its letter to the effect that the Petitioner might be in violation of the Coastal Construction Control Line, construction activities on Lot 107 would have continued to completion in an uninterrupted fashion. Prior to the effective date of the Department's Coastal Construction Control Line, the Petitioner's construction activity, involving the excavation for and placing of the foundation pilings for the residence to be on Lot 107, was undertaken and engaged in a continuous, uninterrupted fashion. The decision to remove the original pilings and replace them with longer poles was not envisioned, intended or made prior to the completion of the entire pole foundation for the house on Lot 107 in the first or second week of May. It was only at this time, when the poles were all installed, that it was determined by the owner and Mr. Shults that the original pilings were not long enough to confer a sufficient view of the Gulf from the house to be constructed on top of them. Thus, the removal of the original pilings and the replacement of them with longer poles in the same holes the original pilings had been installed in, was not an interruption in the construction activities, but was rather the correction of a deficiency in the original materials. This replacement did not involve an alteration or modification of the design, extent and type of materials of the original foundation (except to the immaterial extent that the replacement poles were round instead of square). In short, the construction activity undertaken after April 20, 1984 was a good faith effort to commence construction on the house on Lot 107 and continue it to completion in an uninterrupted fashion. The parties, Dr. Nichols and Mr. Shults, intended from the beginning to use the poles first placed in that foundation as the ultimate foundation for the structure, and did not intend merely placing those original poles, which were later removed, as a subterfuge to obtain a grandfathered status for the construction activity. The construction was landward of the Coastal Construction Control Line as it existed prior to April 30, 1984.

Recommendation Having considered the foregoing Findings of Fact, Conclusions of Law, the evidence of record, the candor and demeanor of the witnesses and the pleadings and arguments of the parties, it is, therefore RECOMMENDED: That the Department of Natural Resources enter a Final Order determining that the structure on Lot 107, Dog Island, Franklin County, Florida is not in violation of the Department of Natural Resources permitting authority. DONE and ENTERED this 25th day of September, 1985 in Tallahassee, Florida. P. MICHAEL RUFF Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 25th day of September, 1985.

Florida Laws (3) 120.57161.052161.053
# 7
PATRICK RUSH vs DEPARTMENT OF NATURAL RESOURCES, 93-000331 (1993)
Division of Administrative Hearings, Florida Filed:Fort Lauderdale, Florida Jan. 19, 1993 Number: 93-000331 Latest Update: Nov. 22, 1993

Findings Of Fact The subject property Petitioners, Michael and Janice Rush, are the owners of a single family residence located at 3032 North Atlantic Boulevard, Fort Lauderdale, Broward County, Florida. Such residence lies seaward of the Broward County Coastal Construction Control Line (CCCL) and is therefore subject to the permitting jurisdiction of respondent, Department of Natural Resources (Department). Section 161.053, Florida Statutes. The first application In April 1991, Petitioners filed a permit application (Permit File No. BO-267) with the Department for permission to renovate their home and construct a swimming pool. That application was found to be incomplete, and by letter of April 17, 1991, the Department notified petitioners of the information required to complete their application. Following receipt and review of the requested information, the Department, by letter of July 26, 1991, advised petitioners that, as proposed, their application to construct a pool and renovate the home would have to be denied. Pertinent to the proposed pool, such letter observed that a portion of the pool would be located seaward of the 30-year erosion projection which is prohibited 1/, the general construction line of major structures would be advanced further seaward, adverse impacts to the beach/dune system during a major storm event could be expected, and cumulative adverse impacts could be expected. Thereafter, by letter of August 14, 1991, the Department was advised that petitioners were submitting new house plans for the subject property, and that the request for leave to construct the pool had been removed from their application. 2/ On December 23, 1991, the Department issued a final order in Permit File No. BO-267 which authorized the petitioners to remodel their home. Such final order observed: . . . The direct and cumulative impacts to the beach and dune system that will be caused by both the seaward location and shore- parallel width of the proposed construction represent the maximum such impacts that are acceptable to the Department. Therefore, future construction on the site seaward of the coastal construction control line shall not extend further seaward of, or increase the shore- parallel coverage occupied by, the proposed structures approved pursuant to this permit. The pool, which petitioners had initially proposed to construct seaward of the home, but subsequently deleted from their plans, constituted a major structure, albeit nonhabitable. Rule 16B-33.002(54)(b), Florida Administrative Code. Petitioners were expressly advised by the Department of their right to request an administrative hearing pursuant to Section 120.57, Florida Statutes, to contest the provisions of the final order. No such contest was filed. 3/ The pending application On February 20, 1992, petitioners filed a new application (Permit File NO. BO-289) with the Department for permission to construct the swimming pool on their property. As proposed, the pool would be located in the beach-dune system seaward of petitioners' home, as well as seaward of an existing retaining wall on the petitioners' property. The pool would measure 16.0' x 35.7' externally, be constructed of reinforced gunite, and be supported by ten piles. The alignment of the pool would be in the shore parallel direction, rather than the shore normal direction as proposed in the prior application, thereby placing the pool landward of the 30-year erosion projection. By letter of March 8, 1992, the Department advised petitioners that their application was incomplete, and requested additional information. Petitioners submitted the final information necessary to complete their application on July 21, 1992. By letter dated October 7, 1992, received by petitioners' representative on October 13, 1992, the Department issued a public notice as follows: The referenced application for a permit pursuant to Section 161.053, Florida Statutes, has been placed on the agenda of the head of the Department of Natural Resources (Governor and Cabinet). The application will be reviewed by the Cabinet Aides in the Cabinet Meeting Room on the lower level of the Capitol, at 9:00 a.m., October 14, 1992. The application will then be heard by the Governor and Cabinet in Room LL03 of the Capitol, at 9:00 a.m., October 20, 1992. You may attend these meetings if you desire. The recommendation [for denial] shown on the enclosed agenda item has been made to the head of the Department by the Executive Director. This represents an agency determination. . . . The notice, consistent with the provisions of Rule 16B-33.012(8), Florida Administrative Code, further advised that any substantially affected person had the right to request a formal hearing, pursuant to Section 120.57, Florida Statutes, within 21 days of receipt of the notice, and that "If the decision of the Governor and Cabinet is different from the staff recommendation as noticed . . ., then the applicant or any substantially affected person shall have 21 days from the date of the Governor and Cabinet's announcement of their decision in which to petition the agency for a hearing." The basis for the Department's denial of petitioners' application to construct the swimming pool was stated as follows: The proposed swimming pool is not consistent with Rule 16B-33.005(1), Florida Administrative Code, because it has not been clearly justified by the applicant and less impactive alternatives are available. For example a similar structure could be sited in a less impactive location landward of the single-family dwelling on the southwest corner of the property. The proposed swimming pool is not designed and located pursuant to Rule 16B- 33.005(2)(a), Florida Administrative Code, for the protection of the beach/dune system in that the structure is to be sited on the seaward slope of the frontal dune and results in excavation remaining as a permanent feature below natural or existing grade. The proposed swimming pool is not designed and located pursuant to Rule 16B- 33.005(2)(c), Florida Administrative Code, for the protection of adjacent properties, because the rigid pile foundation and slabs will cause localized scour and erosion which may affect adjacent properties. The proposed swimming pool is inconsistent with Paragraph 161.053(5)(b), Florida Statutes, because the structure would extend closer to the line of mean high water than a reasonably continuous and uniform construction line in the immediate contiguous or adjacent area. The proposed swimming pool is inconsistent with Rule 16B-33.007(1), Florida Administrative Code, because the structure is not located a sufficient distance landward of the beach/dune system to permit natural shore line fluctuations and to preserve dune stability and natural recovery following storm-induced erosion. The proposed swimming pool is not designed pursuant to Rule 16B-33.007(2), Florida Administrative Code, to minimize adverse impact to the beach/dune system, because the rigid pile foundation and slabs will increase localized scour and erosion within this area as it interacts with storm waves and surge resulting in a significant adverse impact to the beach/dune system. * * * 8. The proposed project is not designed pursuant to Rule 16B-33.005(7), Florida Administrative Code, because a number of similar structures sited at the same relative location on the seaward face of the dune will result in significant cumulative impact which will threaten the beach/dune system or its recovery potential following a major storm event. The Department, therefore, may not authorize the construction of the pool. On October 13, 1992, petitioners requested that their application be removed from the agenda, and be rescheduled for "a later date to be determined." The rationale for petitioners' request was to afford "an opportunity for the permittee and staff to meet in Tallahassee in early to mid November and reach a design for a pool which can be recommended favorably by staff." By letter of October 14, 1992, the Department granted petitioners' request and the item was removed from the agenda for the Governor and Cabinet meeting of October 20, 1992. Such letter further provided that although the Department was willing to meet with petitioners to discuss the staff concerns about their application, that it "must caution you . . . that at this time I do not anticipate that a swimming pool, as you requested, can be satisfactory [sic] located seaward of your home." Petitioners and the Department were unable to resolve their dispute. Accordingly, petitioners filed a petition on November 2, 1992, to contest the proposed denial of their application. By letter of November 13, 1992, the Department advised petitioners that their request for formal administrative hearing was inadequate, but accorded them 14 days from receipt of such letter to submit an appropriate request. Petitioners timely submitted an appropriate request for hearing on November 30, 1992, and the matter was thereafter referred to the Division of Administrative Hearings for the assignment of a Hearing Officer to conduct a formal hearing pursuant to Section 120.57(1), Florida Statutes. 4/ The merits of the pending application As heretofore noted in the findings of fact, the Department enunciated seven reasons to support its denial of petitioner's application. The first basis for denial was the Department's assertion that the proposed swimming pool was not consistent with Rule 16B-33.005(1), Florida Administrative Code, "because it has not been clearly justified by the applicant and less impactive alternatives are available." In this regard, it is observed that Rule 16B-33.005(1), Florida Administrative Code, provides: . . . Establishment of a coastal construction control line . . . does not preclude all development of or alteration of coastal property seaward of such lines. However, activities seaward of a coastal construction control line . . . shall be limited and the necessity of such development, construction or alteration shall be stated and clearly justified by the applicant. (Emphasis supplied) The aforesaid rule does not further explain what is contemplated by the requirement that the applicant clearly justify the "necessity" of the proposed development; however, the plain and ordinary meaning of the word can be ascertained by reference to a dictionary. 5/ In this regard, "necessity" is defined to mean "something that cannot be done without." Websters New Twentieth Century Dictionary. It is also defined as "something needed for the existence, effectiveness, or success of something (a requirement)," and "the state or fact of being required or unavoidable." The American Heritage Dictionary of the English Language. Here, the proof fails to demonstrate any "necessity" to construct the swimming pool since it fails to credibly support the conclusion that such construction is required for the effective or reasonable use of petitioners' property or that such construction is essential for the well-being of its occupants.6/ To the contrary, the petitioners' decision to construct the pool is merely a matter of personal preference or convenience. Moreover, the proof fails to demonstrate any "necessity" to construct a pool of the size and configuration proposed (16' x 35.7' with a maximum depth of 8') or of the materials selected (reinforced gunite supported by piles). Indeed, a pool of a different configuration or size could be located elsewhere on the property and the pool could be constructed on a base slab foundation or of vinyl to alleviate the adverse effects of its current design, discussed infra. 7/ As further reasons for denial, the Department concluded that construction of the swimming pool was not consistent with Rule 16B-33.005(2)(a), Florida Administrative Code, "for the protection of the beach/dune system in that the structure is to be sited on the seaward slope of the frontal dune and results in excavation remaining as a permanent feature below natural or existing grade"; Rule 16B-33.005(2)(c), Florida Administrative Code, "for the protection of adjacent properties, because the rigid pile foundation and slabs will cause localized scour and erosion which may affect adjacent properties"; Rule 16B- 33.007(1), Florida Administrative Code, "because the structure is not located a sufficient distance landward of the beach/dune system to permit natural shoreline fluctuations and to preserve dune stability and natural recovery following storm-induced erosion"; and Rule 16B-33.007(2), Florida Administrative Code, "to minimize adverse impact to the beach/dune system, because the rigid pile foundation and slabs will increase localized scour and erosion within this area as it interacts with storm waves and surge resulting in a significant adverse impact to the beach/dune system." Pertinent to the aforesaid reasons for denial, Rule 16B-33.005(2), Florida Administrative Code, the "Department Policy Statement on Permits," provides: Seaward of the coastal construction control line . . ., special siting, structural and other design considerations are required: (a) for the protection of the beach-dune system; * * * (c) for the protection of adjacent properties. And, Rule 16B-33.007, Florida Administrative Code, the "Structural and Other Requirements Necessary for Permit Approval," provides: The proposed structure or other activity shall be located a sufficient distance landward of the beach-dune system to permit natural shoreline fluctuations and to preserve the dune stability and natural recovery following storm induced erosion . . . . All structures shall be designed so as to minimize any expected adverse impact on the beach-dune system or adjacent properties and structures and shall be designed consistent with Section 16B-33.005, Florida Administrative Code. Relevant to such rules, the proof demonstrates that the frontal dune on the subject property appears to have been leveled at an elevation of approximately +12.0 feet NGVD, and petitioners' home is located on top of the crest of the frontal dune. The seaward slope of the frontal dune begins at the seaward face of the house and slopes down to the beach. Approximately 12 feet seaward of the house is an existing retaining wall. The proposed pool will be sited immediately seaward of such wall and therefore on the seaward slope of the frontal dune. The proposed pool is a pile supported concrete swimming pool with exterior dimensions of 16.0' shore-normal by 35.7' shore-parallel, and a maximum depth of 8.0'. The foundation is specified to be auger-cast piles, which will penetrate to an elevation of -23.0' NGVD or 3' embedment where a rock layer is encountered. The elevation of the pool is proposed at +13.0' NGVD, with a bottom elevation of +4.0' NGVD. As designed and sited, construction of the pool would destabilize the dune, hinder its function of protecting upland development during a storm event, and adversely affect natural shoreline fluctuation and recovery following storm induced erosion. In this regard, the proof demonstrates that the location of the pool seaward of the existing retaining wall would interrupt the natural continuity of dune formation because sand would accumulate seaward of the pool in a less stable location and would impede the accumulation of sand on adjacent properties. Construction of the pool, as designed and sited, would also induce scour during the course of a storm event impacting the structure. Such storm- induced scour, in addition to erosion, would cause the loss of additional sand at the vicinity of the structure, robbing the beach-dune system of additional sand necessary to protect upland structures, and would also contribute to the potential failure of the structure itself and other upland structures. In this regard, the proof demonstrates that approximately 1,000 cubic yards of sand would be lost on petitioners' section of the beach in the event of a 10-year storm. Additionally, structure-induced scour of 77.5 cubic yards from the ten piles, 120.4 cubic yards from the pool shell, and 15.8 cubic yards from the "end effects" of the pool (the amount of structure-induced scour from the ends of the structure) might reasonably be anticipated in the event of a 10-year storm. If the pool were to be impacted by a higher frequency storm, such as a 20-year or a 100-year storm, scour and erosion would increase. 8/ As an additional basis for denial, the Department concluded that construction of the pool was not consistent with Section 161.053(5)(b), Florida Statutes, "because the structure would extend closer to the line of mean high water than a reasonably continuous and uniform construction line in the immediate contiguous or adjacent area." Here, the proof supports the Department's conclusion. As its final basis for denial, the Department concluded that construction of the pool was not consistent with Rule 16B-33.005(7), Florida Administrative Code, "because a number of similar structures sited at the same relative location on the seaward face of the dune will result in significant cumulative impact which will threaten the beach/dune system or its recovery potential following a major storm event." Pertinent to the aforesaid basis for denial, Rule 16B-33.005(7), Florida Administrative Code, provides: An individual structure or activity may not have an adverse impact on the beach or dune system at a specific site; however, a number of similar structures or activities along the coast may have a significant cumulative impact resulting in the general degradation of the beach or dune system along that segment of shoreline. The Department may not authorize any construction or activity whose cumulative impact will threaten the beach or dune system or its recovery potential following a major storm event . . . . Here, petitioners' project is expected to have significant adverse impacts to the beach-dune system as a consequence of its design and siting. Accordingly, the provisions of Rule 16B-33.005(7), Florida Administrative Code, are not relevant. Moreover, there was no proof concerning any similar structures along the coast, existing or proposed, that would contribute to or intensify the degradation of the beach-dune system occasioned by the proposed project. Accordingly, it cannot be concluded that cumulative impact is a relevant issue in these proceedings. While cumulative impact is not relevant to the pending application, the other reasons advanced by the Department for denial of the application have, as heretofore found, a rational basis in fact. Under such circumstances, petitioners have failed to demonstrate their entitlement to the subject permit.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that a final order be rendered denying petitioners' application to construct seaward of the CCCL. DONE AND ENTERED in Tallahassee, Leon County, Florida, this 22nd day of November 1993. WILLIAM J. KENDRICK Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 22nd day of November 1993.

Florida Laws (5) 120.57120.60120.62161.052161.053
# 8
MACLA LTD, II, LIMITED PARTNERSHIP; H. JOSEPH HUGHES, AS TRUSTEE OF THE BETTY PRICE HUGHES QUALIFIED VACATION RESIDENCE TRUST; AND KERSHAW MANUFACTURING COMPANY, INC. vs DEPARTMENT OF ENVIRONMENTAL PROTECTION AND BOARD OF TRUSTEES OF THE INTERNAL IMPROVEMENT TRUST FUND, 10-008197RU (2010)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Aug. 23, 2010 Number: 10-008197RU Latest Update: Sep. 08, 2011

The Issue All Three Cases Whether the Petitioners have standing to bring their respective challenges pursuant to Section 120.56(4), Florida Statutes? Case No. 10-5348RU Whether either or both Original Specific Condition 1 and the Department ECL Position constitute a rule? Case Nos. 10-6205 and 10-8197 Whether Specific Condition 5 constitutes a rule? Attorney's Fees Whether an order should be entered against the Department for costs and attorney's fees under Section 120.595(4), Florida Statutes?

Findings Of Fact The Draft Permit The Draft Permit (and its revisions) authorizes the County "to construct the work outlined in the activity description and activity location of this permit and shown on the approved permit drawings, plans and other documents attached hereto." Joint Exhibit, Vol. III, Tab 9, page 3 of 26. The "activity description" and the "activity location" are detailed on the first page of the Draft Permit. See Joint Exhibit, Vol. III, Tab 9 (first page of 26). The drawings, plans and other documents attached to the Draft Permit are contained under Tab 10 of Volume III of the Joint Exhibit. The Parties Petitioner Guidry is co-trustee of the Guidry Living Trust (the "Guidry Living Trust"). He has independent authority to protect, conserve, sell, lease, encumber or otherwise dispose of trust assets. Those assets include a condominium unit in the Oceania Condominium. The condominium unit owned by the Guidry Living Trust includes an undivided interest held with all other unit owners in the common property at the Oceania Condominium. The common property includes real property that fronts the Gulf of Mexico located at 720 Gulf Shore Drive in the City of Destin, Florida. The real property has the MHWL of the Gulf of Mexico as its southern boundary. Petitioner Oceania is a condominium association established pursuant to Florida's Condominium Act, Chapter 718, Florida Statutes. It does not own any real property. Mr. Guidry testified that he is authorized in his capacity as president of the Association to initiate and pursue this administrative proceeding on its behalf. No documents were entered in evidence reflecting that Oceania's Board of Directors approved the filing of the petition. The owners of condominium units at the Oceania Condominium, including the Guidry Trust, comprise the membership of Oceania. The unit owners all own undivided shares in the Oceania Condominium common property including the real estate that extends at its southern boundary to the MHWL of the Gulf of Mexico. The owners did not vote on whether to file the petition in Case No. 10-05348RU. Petitioners David and Rebecca Sherry are leaseholders of real property where they reside. Located at 554 Coral Court, Number 511, Fort Walton Beach, Florida 32548, the property is in an area in Okaloosa County on Santa Rosa Island that is known as Okaloosa Island. The property leased by the Sherrys is not within the Western Destin Project. Petitioner John Donovan is a leaseholder of real property located at 909 Santa Rosa Boulevard, Numbers 131-132, El Matador Condominium, Fort Walton Beach, Florida 32548, in the same area as the Sherry's residence. Petitioner MACLA II, Ltd., is a Texas Limited Partnership. Louise Brooker is its president. It owns real property which fronts the Gulf of Mexico located at 620 Gulf Shore Drive, Destin, Florida. The southern boundary of the property is the MHWL of the Gulf of Mexico. The MACLA property is located adjacent to the shoreline that is the subject of the Western Destin Project. The Betty Price Hughes Qualified Vacation Residence Trust (the "Hughes Trust") owns real property at 612 Gulf Shore Drive. Its southern boundary is deeded the MHWL of the Gulf of Mexico. The property is located adjacent to the shoreline subject to the Western Destin Project. Petitioner H. Joseph Hughes is a trustee of the Hughes Trust. Petitioner Kershaw Manufacturing Company, Inc., an Alabama corporation, is the owner of real property located at 634 Gulf Shore Drive, Destin, Florida. Its southern boundary the property is the MHWL of the Gulf of Mexico. The property is located adjacent to the shoreline subject to the Western Destin Project. Royce Kershaw is the president of the Kershaw Manufacturing Company. He testified that as president of the company, he has the authority to act on behalf of the company and has the power to bind the corporate entity. The Department of Environmental Protection is responsible for the administration of Chapter 161, Florida Statutes, Parts I and II, the "Beach and Shore Preservation Act." § 161.011, Fla. Stat. The Board of Trustees of the Internal Improvement Fund is responsible for stewardship of its public trust properties under Chapter 253, Florida Statutes. Included among those properties is the sovereignty submerged lands along the coast of the Gulf of Mexico. The ECL and the MHWL In the context of the Beach and Shore Preservation Act, the MHWL and the ECL were discussed by the Florida Supreme Court in Walton County v. Stop the Beach Renourishment, Inc., 998 So. 2d 1102 (Fla. 2008) (the "Walton County Supreme Court Case"): Pursuant to section 161.141, when a local government applies for funding for beach restoration, a survey of the shoreline is conducted to determine the MHWL for the area. Once established, any additions to the upland property landward of the MHWL that result from the restoration project remain the property of the upland owner subject to all governmental regulations, including a public easement for traditional uses of the beach. § 161.141. After the MHWL is established, section 161.161(3) provides that the Board must determine the area to be protected by the project and locate an ECL. In locating the ECL, the Board "is guided by the existing line of mean high water, bearing in mind the requirements of proper engineering in the beach restoration project, the extent to which erosion or avulsion has occurred, and the need to protect existing ownership of as much upland as is reasonably possible." § 161.161(5). Pursuant to section 161.191(1), this ECL becomes the new fixed property boundary between public lands and upland property after the ECL is recorded. And, under section 161.191(2), once the ECL has been established, the common law no longer operates "to increase or decrease the proportions of any upland property lying landward of such line, either by accretion or erosion or by any other natural or artificial process." Walton County, at 1108. The Pre-project MHWL in This Case and the ECL The Pre-project MHWL called for by Original Specific Condition 1 was never established. No evidence was introduced as to where the Pre-project MHWL would have been located had it been set and in particular, where it would have been located in relation to an ECL. Rod Maddox is a long-time surveyor with the Department's Division of State Land in the Bureau of Survey & Mapping. See P-244. Mr. Maddox testified about his experience with pre-project MHWLs and where they are located in relation to ECLs. Familiar with the term "pre-project mean high water line," Mr. Maddox defined it as the mean high water line prior to the placement of fill used in a beach restoration project. See id. at 29. He testified that pre-project MHWLs have been required in the many beach restoration cases with which he is familiar. He testified further that when it comes to location, there is no difference between a pre-project MHWL and an ECL. The denominations may be different but Mr. Maddox testified "as to how . . . established, I see them as one and the same." Id. at 30. Original Special Condition 1: the Pre-project MHWL On December 31, 2009, the Department issued the NOI. Attached to it was the Draft Permit. The Draft Permit contained the following paragraph as Special Condition 1: Prior to construction of the beach restoration project, the Permittee must record in the official records of Okaloosa County a Certificate, approved by the Department, which describes all upland properties (including their owners of record) along the entire shoreline of the permitted project, with an attached completed survey of the pre-project Mean High Water Line ("Mean High Water Line Survey") conducted along the entire permitted project shoreline length. The Mean High Water Line Survey must have been completed in a manner complying with Chapter 177, Florida Statutes, as determined by the Department. No construction work pursuant to this joint coastal permit shall commence until the Certificate and attached Mean High Water Line Survey have been approved and archived by the Department's Bureau of Survey and Mapping, and the Department has received proof of recording of such documents (see Specific Condition No. 4.c.). The approved Certificate and attached Mean High Water Line survey shall be attached to, and kept as part of this joint coastal permit and authorization to use sovereign submerged lands. If in the future the Permittee seeks reimbursement from the State for costs expended to undertake (construct) the permitted project, then, prior to, and as a condition of receipt of any authorized and approved reimbursement, the Board of Trustees will establish an ECL consistent with the provisions of Chapter 161, Florida Statutes. The Permittee shall be required to record such a line in the Okaloosa County official records. Joint Exhibit, Vol. III, No. 9. The Oceania Petitioners, as landowners within the Project area, challenged the issuance of the Draft Permit on January 14, 2010. See Case No. 10-0516. Among the bases for the challenge was that the Department lacked authority to implement Original Special Condition 1 and, in particular, its requirement that the County record a completed survey of the pre-project MHWL in lieu of the establishment of an ECL. On July 26, 2010, the Department revised the Draft Permit to eliminate from the Project the common property owned by the unit owners of the Oceania Condominium. The change was supported by a letter from Michael Trudnak, P.E., of Taylor Engineering, Inc., on behalf of the County which stated: "On behalf of Okaloosa County, Taylor Engineering submits this request to modify the project area and Draft Joint Coastal Permit for the Western Destin Beach Restoration Project [file nos. excluded]. The applicant has decided to remove the Oceania Condominium property from the beach fill placement area." Joint Exhibit, Vol. III, Tab 15, Exhibit A. The revised project, as described in permit drawings enclosed with Mr. Trudnak's letter includes two reaches: Reach 1 extends from the east jetty of East Pass to approximately 600 ft east of FDEP reference monument R-22 (R22.6) and Reach 2 extends from approximately 200 ft east of R-23 (R-23.2) to R-25.5. The Oceania Condominium property is in the gap between the two beaches. Additionally, the letter requested that the Department modify Specific Condition 1 of the Draft Permit to reflect the modified project area so that the MHWL Survey requirement of Specific Condition 1 would exclude the Oceania Condominium property. In accord with the request, Special Condition 1 was amended to add the following language: "With respect to the shoreline seaward of the Oceania Owner's [sic] Association, Inc., members' common elements property, neither a pre-project Mean High Water Line survey, nor a Certificate with a description of the pre-project Mean High Water Line shall be recorded in conjunction with this coastal permit." Joint Exhibit, Vol. III, Tab 15, the First Revised Draft Permit, Page 5 of 26. On August 4, 2010, as the Department neared the end of its case in the third day of the hearing, it announced that the Revised Draft Permit would "be revised [again, this time] to require the establishment of an ECL under the applicable statute." Tr. 621. The draft permit, accordingly, was revised for a second time (the "Second Revised Draft Permit"). The Department carried out the second revision in a notice filed at the Division of Administrative Hearings on August 18, 2010 (the August 18, 2010, Notice). The August 18, 2010, Notice contains two changes to the First Revised Draft Joint Permit. The first change deletes the existing language in Original Specific Condition 1 (the language challenged in Case No. 10-5348RU) in its entirety. It substitutes the following language: Prior to construction of the beach restoration project, the Board of Trustees will establish an Erosion Control Line along the shoreline of the beach restoration project. The Erosion Control Line shall be established consistent with the provisions of ss. 161.141-161.211, Florida Statutes. An Erosion Control Line shall not be established in conjunction with this joint coastal permit with respect to the shoreline seaward of the Oceania Owner's [sic] Association, Inc. members' common elements property. In lieu of conducting a survey, the Board of Trustees may accept and approve a survey as initiated, conducted, and submitted by Okaloosa County if said survey is made in conformity with the appropriate principles set forth in ss. 161.141-161.211. Department of Environmental Protection's and Board of Trustees of the Internal Improvement Fund's Notice of Revisions to the Proposed Joint Coastal Construction Permit, page 3 of 4. The second change is made with respect to Specific Condition No. 4(c) of the First Revised Draft Permit, one of a list of items to be submitted to the Department for approval prior to the commencement of construction and the issuance of a Notice to Proceed by the Department. The existing language is deleted in its entirety and the following language is substituted: Written documentation that the Erosion Control Line required by Special Condition Number 1 has been filed in the public records of Okaloosa County. Id. The Department ECL Position Chapter 161: Beach and Shore Preservation Chapter 161, Florida Statutes, governs "Beach and Shore Preservation." "Parts I and II of this chapter may be known and cited as the 'Beach and Shore Preservation Act.'" § 161.011, Fla. Stat. Part I governs "Regulation of Construction, Reconstruction, and Other Physical Activity." Sections 161.011 through 161.241 comprise Part I. The Department developed its position on ECLs claimed by Petitioners to be an Unadopted Rule by considering Part I, in particular Sections 161.088 (which declares the public policy to properly manage and protect Florida's beaches) through 161.211. At some point in 2009, the Department saw a distinction related to ECLs in Sections 161.088-161.211 between beach restoration projects where state funding was used for construction and projects where no state funds were used. The former seemed to require ECLs, the latter not. Several statutory provisions were viewed as particularly relevant. For example, Section 161.141, Florida Statutes, declares that it is the public policy of the state "to cause to be fixed and determined, pursuant to beach restoration . . . projects, the boundary line between sovereignty lands . . . and the upland properties adjacent thereto " The section that mainly governs ECLs is Section 161.161. It provides the procedure for approval of projects for the restoration and maintenance of critically eroded beaches, subject to a beach management plan which is funded, in part, by the state. With regard to ECLs, the statute provides: Once a project [for the restoration and maintenance of a critically eroded beach] is determined to be undertaken, a survey of all or part of the shoreline within the jurisdiction of the local government in which the beach is located shall be conducted in order to establish the area of beach to be protected by the project and locate an erosion control line. * * * Upon completion of the survey depicting the area of the beach erosion control project and the proposed location of the erosion control line, the board of trustees shall give notice of the survey and the date on which the board of trustees will hold a public hearing for purpose of receiving evidence on the merits of the proposed erosion control line and, if approval is granted, of locating and establishing such requested erosion control line in order that any persons who have an interest in the location of such requested erosion control line can be present at such hearing to submit their views concerning the precise location of the proposed erosion control line. * * * The board of trustees shall approve or disapprove the erosion control line for a beach restoration project. In locating said line, the board of trustees shall be guided by the existing line of mean high water, bearing in mind the requirements of proper engineering in the beach restoration project, the extent to which the erosion or avulsion has occurred, and the need to protect existing ownership of as much upland as is reasonably possible. § 161.161, Fla. Stat. Development of the Department's Position on ECLs Prior to 2009, the Department's established ECLs for beach restoration projects whether the project's construction was supported by state funding or not. There was an exception: when the property landward of the MHWL was owned by the state. In such a case, the Department saw no need to set an ECL since both the sovereignty lands and the adjacent uplands property are owned by the state. This position held at least through January 15, 2009, when the Department held a workshop and hearing pursuant to Section 161.161, Florida Statutes, in Okaloosa County to establish an ECL for the Western Destin Project. The hearing officer who conducted the ECL hearing was West Gregory, Department Assistant General Counsel. While consideration of where the ECL should be established for the Western Destin Project was underway, there were ongoing discussions by e-mail and in briefings of whether the statute required an ECL. The discussion was prompted when Mr. Gregory, as Department Assistant General Counsel, drafted a memorandum (the "Draft Memorandum") to Michael Barnett, Chief of the Bureau of Beaches and Coastal Systems (the Bureau) to be sent through Paden Woodruff, an Environmental Administrator. The memorandum related to another beach restoration project in Okaloosa County: a project involving Eglin Air Force Base. The Draft Memorandum shows a date of January "XX", 2009, and is stamped "DRAFT." P-119. It presents the question "Should . . . [the Department] require the United States Air Force (USAF) to establish an erosion control line (ECL) for the beach restoration project located on Eglin AFB?" Id. The Draft Memorandum provides a brief answer: "No, . . . because the beach . . . is not critically eroded." Id. The memorandum recognizes the public policy of the state to fix the boundary between public and private lands for beach restoration projects in Section 161.141, Florida Statutes, and a requirement that the Board of Trustees "must establish the line of mean high water prior to the commencement of a beach restoration project," id., leading to the suggestion that each and every beach restoration project must establish an ECL. The Draft Memorandum, however, construes Section 161.141, Florida Statutes, with Section 161.161, Florida Statutes, and draws support from an Attorney General Opinion and the Walton County Florida Supreme Court case to conclude that it is only when a project is undertaken with state funding that an ECL must be established. In the case of the Eglin AFB beach restoration projects, the Draft Memorandum concludes: Id. This determination not to establish an ECL on the Eglin AFB beach restoration project would not preclude the USAF from obtaining a JCP permit. Rather, it precludes the USAF from receiving state funding assistance. The Draft Memorandum was not sent to the intended recipients. It was submitted to two other lawyers in the Department. Mr. Gregory did not receive comments from them. Although no comments were made to Mr. Gregory after the draft of the memorandum was sent to other members of the legal staff, the subject remained under discussion in the Department in early 2009. Sometime in early 2009, based on a legal analysis of Department attorneys, the Department took the position that an ECL is required to be set when state funds are used for the construction of a project. The converse of this position, that an ECL is not required to be set when no state funds are involved, is the statement alleged to be an unadopted rule. Two permits were issued that did not require an ECL: one for the Eglin AFB beach restoration project in March of 2009, and another that was an emergency permit for Holiday Isle. As with Specific Condition 1 in the Western Destin Project, the determination to not require an ECL was because of the lack of state funding. As Mr. Barnett testified about the two permits, there "is no State cost share for construction . . . [and] that's the reason [the Department] didn't require establishment of an ECL." Tr. 1279. Mr. Gregory's Draft Memorandum was never finalized. The Department issued three permits or draft permits (including for the Western Destin Project) with specific conditions that required pre-project MHWLs and that did not require ECLs. Otherwise, the Department has not committed the Department ECL Position to writing. Nonetheless, the Department ECL Position was stated in a deposition taken in this case on July 26, 2010. On July 26, 2010, the deposition of Janet Llewellyn, the Director of Water Resources Management was taken by Petitioners. Director Llewellyn is "responsible ultimately for all the projects that are processed and actions taken out of [the] division." P-223 at 10. These include permits issued by the Bureau and in particular, the Draft Permit, First Revised Draft Permit and the Second Draft Permit for the Project. When asked about the Department's statement that an ECL is not required when there is not state funding, Ms. Llewellyn preferred to rephrase the Department position as to when an ECL is required rather than when it is not required. She then testified that an ECL is required when there is "state funding involved through [the Department's] funding program." Id. at 13. Ms. Llewellyn was unable to pinpoint the moment the Department reached such a position other than: [t]he question came up sometime in the last year or two -- I couldn't tell you when -- about what the statute actually required in terms of when it was proper to set an erosion control line or required. And our attorneys did a legal analysis, again, of the statute, and that was their legal opinion of what the statute required. Tr. 14. Whatever the date that such a position was precisely firmed up, Ms. Llewellyn was able to testify on July 26, 2010, "that if state funding is going to a project, than an ECL needs to be set. That's what the statute requires." Id. This statement was based on the opinions of Department attorneys prior to their use in connection with the issuance of beach restoration permits in Okaloosa County. The Department has not initiated rule-making with respect to its ECL Position. Whether rule-making would be initiated was not known by the Bureau Chief on August 24, 2010, during his testimony in the final hearing. Change of Position The Department modified its position on ECLs that it appeared to have at the time of Ms. Llewellyn's deposition on August 4, 2010. As detailed above, it announced that an ECL would be required for the Western Destin Project, after all. The modification was formalized with the filing of the Second Revised Draft Permit on August 18, 2010. Specific Condition 5 Before the challenged language in Specific Condition 5 was added by the First Revised Draft Permit, the Department had relied on General Condition 6 to give notice to permittees that the permit did not allow trespass: This permit does not convey to the Permittee or create in the Permittee any property right, or any interest in real property, nor does it authorize any entrance upon or activities on property which is not owned or controlled by the Permittee. The issuance of the permit does not convey any vested rights or any exclusive privileges. Joint Ex. 9. Based on the petitions in the Permit Challenge Cases, the Department proposed in the First Revised Draft Permit to add to Specific Condition 5 the language that is underscored in the following: The Permittee is advised that no work shall be performed on private upland property until and unless the required authorizations are obtained. Sufficient authorizations shall included: (1) written evidence of ownership of any property which will be used in carrying out the project; (2) authorization for such use from the property owner which upland of mean high-water; (3) construction and management easements from upland property owners; or (4) a judgment from a court of competent jurisdiction which reflects that such authorization, in whole or in part, is not required. The Permittee is also advised to schedule the pre-construction conference at least a week prior to the intended commencement date. At least seven (7) days in advance of a pre-construction conference, the Permittee shall provide the written authorizations for the portion of the project for which construction is about to commence, as required above, written notification, advising the participants (listed above) of the agreed-upon date, time and location of the meeting, and also provide a meeting agenda and a teleconference number. Joint Exhibit, Volume III, Tab 15, the First Revised Draft Permit, Page 7 of 26. There was no evidence that the language added to Specific Condition 5 by the First Revised Draft Permit had been in any other permits or that the Department intended to use the language in any other beach restoration permits. Other than whatever might be gleaned from the Draft Permit, itself (and its revisions), there was no evidence offered that the property of any of the petitioners, in fact, would be used in the Western Destin Beach Project.

Florida Laws (12) 120.52120.54120.56120.57120.595120.68161.011161.088161.141161.161161.191161.211
# 9
KENNETH G. STEVENS AND CHIRL M. STEVENS vs DEPARTMENT OF NATURAL RESOURCES, 90-001507 (1990)
Division of Administrative Hearings, Florida Filed:Fort Lauderdale, Florida Mar. 05, 1990 Number: 90-001507 Latest Update: Sep. 20, 1990

Findings Of Fact On December 12, 1988, Petitioners filed an application with Respondent for a permit to construct improvements to real property seaward of the coastal construction control line (CCCL). Petitioners' property is located at 2400 North Atlantic Boulevard, Fort Lauderdale, Florida. The parcel of land owned by Petitioners measures approximately 50' in width and 140' in depth and is located in a primarily residential area of beachfront property with high property values. On this parcel is a residence that is approximately 1600 square feet in size. The residence is constructed on reinforced concrete pilings. There are many other residential and commercial structures in this area which are also constructed on reinforced concrete pilings. The improvements to this property seaward of the CCCL that Petitioners desire to make and that Respondent finds objectionable is the construction of a poured monolithic reinforced concrete slab patio supported by twenty-one reinforced concrete pilings. The patio would be approximately 27' by 50' in size. On November 17, 1987, Respondent approved an application filed by a previous owner of this property for the construction of a patio to be constructed with concrete pavers. Petitioners arranged to have the previously approved permit transferred to their name. The project contemplated by the subject application employs a different method of construction than the one permitted in 1987 because Petitioners desire to have a patio that is more attractive and is easier to maintain. Petitioners are also concerned that concrete pavers will be hazardous during a storm since they may be subject to being swept along by high winds and water. Petitioners have valid reasons for preferring the method of construction reflected by the subject application based on aesthetic and maintenance considerations. However, Petitioners did not establish that the proposed method of construction was necessary as a safety measure. To the contrary, the greater weight of the evidence was that blocks the size of the pavers to be used for the construction that has been permitted would not be propelled by either hydrodynamic or aerodynamic forces during a major storm as Petitioners contend. Instead, these blocks would likely be undermined during a major storm and, because of their weight, fall as the beach is eroded. Respondent has regulatory authority over the property in question. Respondent's regulatory authority, which includes rule making authority, is conferred by statute. Respondent's responsibilities include the preservation of the beach-dune area within its jurisdiction. There is a relationship between the siting of a structure, in terms of its proximity to the shoreline, and the likelihood that the structure will have an impact on the beach and dune systems. The subject patio is to be located within the beach-dune system. The patio Petitioners propose to construct on concrete pilings would have more of an adverse impact on the beach-dune system than a patio constructed of concrete pavers. During a major storm, greater erosion on the site around the pilings will occur as a result of scour. Following a major storm, the ability of a dune to re-form will be more inhibited if the patio is supported by pilings. Considering the hundreds of thousands of pilings that are already in place along the beach, the effect of the twenty-one pilings proposed by Petitioners, whether considered individually or cumulatively, will be insignificant. A patio is usually considered by Respondent to be a "minor structure". "Minor structures" are non-habitable structures that are generally designed to be expendable during a major storm event. Dune walkovers, viewing platforms, and decks are examples of minor structures. A patio constructed of concrete pavers would be another example. The nature of their construction permits minor structures to be placed more closely to the shoreline than major structures. The patio as proposed Petitioners has been properly categorized by Respondent as being a "major structure" since it is designed to withstand a major storm event. Respondent has not to date permitted any major structure as far east of the CCCL in this area of Broward County as Petitioner's proposed project. All major structures constructed on pilings that are that far east of the CCCL were built before permits were required. Respondent is concerned that the granting of the subject permit will set a precedent that will require the issuance of permits for the construction of other major structures as far seaward of the CCCL as the Petitioners' proposed project, and that such construction would result in a cumulative adverse impact on the beach-dune system.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED: That Respondent enter a final order which denies the subject permit. DONE AND ENTERED this 20th day of September, 1990, in Tallahassee, Leon County, Florida. CLAUDE B. ARRINGTON Hearing Officer The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 904/488-9675 Filed with the Clerk of the Division of Administrative Hearings this 20th day of September, 1990. APPENDIX TO THE RECOMMENDED ORDER The following rulings are made on the proposed findings of fact submitted on behalf of the Petitioners. The proposed findings of fact in paragraphs 1-6 and 8-10 are adopted in material part by the Recommended Order. The proposed findings of fact in paragraph 7 are rejected as being contrary to the greater weight of the evidence. The proposed findings of fact in paragraph 8 are rejected as being argument. The proposed findings of fact in the first sentence of paragraph 11 are adopted in material part by the Recommended Order. The proposed findings of fact in the second sentence of paragraph 11 are rejected as being contrary to the greater weight of the evidence. The proposed findings of fact in the third sentence of paragraph 11 are rejected as being unnecessary to the conclusions reached. The proposed findings of fact in paragraph 12 are rejected as being subordinate to the findings made. The proposed findings of fact in paragraph 13 are rejected as being conclusions of law that are unnecessary to the conclusions reached. The proposed findings of fact in paragraph 14 are rejected as being unsubstantiated by the evidence. While Petitioners' application included as a proposed condition to the issuance of the permit, a covenant running with the land that would require the property owner to reconstruct the beach-dune system in the event of destruction by a major storm, the evidence did not establish, as Petitioners proposed, that the covenant would "... protect the interests of DNR and its long term end of protecting the dunes and beaches". The following rulings are made on the proposed findings of fact submitted on behalf of the Respondent. The proposed findings of fact in paragraphs 1-2, 5-6, 10-16, 24-27, 30-31, and 33 are adopted in material part by paragraph 1 of the Recommended Order. The proposed findings of fact in paragraphs 3 and 4 are rejected as being unnecessary to the conclusions reached. The proposed findings of fact in paragraph 21 are rejected as being subordinate to the findings made. The proposed findings of fact in paragraphs 7-9 and 28-29 are rejected as being unnecessary to the conclusions reached or as being subordinate to the findings made. The proposed findings of fact in paragraphs 17-20, 23, and 32 are rejected as being unnecessary to the conclusions reached. These proposed findings are incorporated in part as conclusions of law. The proposed findings of fact in paragraph 22 are adopted in part by the Recommended Order, and are rejected in part as being subordinate to the findings made. COPIES FURNISHED: Kenneth G. Stevens 412 Northeast Fourth Street Fort Lauderdale, Florida 33301 Dana M. Wiehle, Esquire Assistant General Counsel Department of Natural Resources 3900 Commonwealth Boulevard Room 1003 Tallahassee, Florida 32399-3000 Tom Gardner Executive Director Department of Natural Resources 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 Ken Plante General Counsel Department of Natural Resources 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000

Florida Laws (2) 120.57161.053