Elawyers Elawyers
Washington| Change
Find Similar Cases by Filters
You can browse Case Laws by Courts, or by your need.
Find 49 similar cases
ALLANS SUBDIVISION HOMEOWNERS` ASSOCIATION, INC., ET AL. vs. THOMAS E. WASDIN, BEACH WOODS, AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 83-000106 (1983)
Division of Administrative Hearings, Florida Number: 83-000106 Latest Update: Oct. 21, 1983

The Issue The ultimate issue to be resolved in this proceeding is whether the Department should issue a permit allowing the construction of a wastewater treatment and disposal system as requested in the modified application filed by Thomas E. Wasdin. The applicant and the Department contend that reasonable assurances have been given that the proposed facility will not result in violations of any of the Department's rules or regulations. The Petitioner contends that the proposed facility is located too near to existing shallow water drinking wells and that the facility otherwise fails to comport with the Department's rules and regulations.

Findings Of Fact Petitioner is the president of Beach Woods of Brevard County, Inc. The corporation is the developer of "Beach Woods," a 376-unit planned unit development located in Melbourne Beach, Brevard County, Florida. One hundred eighty of the units have already been developed. Existing regional sewage treatment facilities operated by Brevard County are not adequate to accommodate the total number of units that the applicant proposes to develop. It appears that 24 more hookups are all that the existing facilities will tolerate. Beyond that number, a sewer moratorium is in effect, and unless the applicant can make some other arrangement for disposing of sewage, the development cannot be completed. The county has approved the planned unit development. In order to meet sewage treatment needs of the proposed development, the applicant is proposing to construct a "package sewage treatment plant" to accommodate waste that exceeds quantities that can be handled by existing regional facilities. Once the regional facilities are upgraded so that the development's sewage treatment needs can be accommodated, the applicant proposes to disassemble the package plant and utilize the regional facilities. The proposed plant would be a 50,000 gallons per day contact stabilization sewage treatment plant. Initially, it would be operated as a 5,000 to 15,000 gallons per day aeration plant. Once loads reach 18,000 gallons per day, it would become a contact stabilization plant. The Present collection and transmission system for sewage that exists at Beach Woods includes an 8-Inch collection station from which sewage flows to an existing lift station that pumps effluent via 6-inch pipes to the regional plant. When the proposed plant is completed, a computerized system would be set up to send effluent to the new plants when the limits that the regional plant can accommodate are met. Once the regional plant is upgraded to sufficient capacity, the bypass to the proposed plant would be eliminated, and all units would then be connected to the original collection system. The proposed treatment plant is based upon proven technology that has been in existence for more than 50 years. The plant should operate reliably, and proper consideration has been given to odor, noise, lighting, and aerosol drift. In close proximity to the plant, it is likely that there would occasionally be a "earthy smell" that would be noticeable, but not objectionable. Outside of the immediate proximity, no odor would be noticeable. Large fans would be operated in connection with the plant, and some noise would result. It does not, however, appear that the noise would be excessive or bothersome, even in the immediate vicinity of the plant. The plant would be lighted by street lights and would not result in any more excessive lights than normal street lights. The plant is not of the sort that aerosol drift is a likely problem. Adequate considerations have been given to providing emergency power to the plant in the event of a power outage. The plant could sit for at least 20 hours without power before any emergency would exist. If there was a power outage in excess of that period, emergency power sources are available. Consideration has been given to the 100-year flood plain. The plant has been placed at an elevation that keeps it outside of the 100-year flood plain. The land application system proposed by the applicant would utilize drain fields that would be alternately rested. Groundwater flows from the area of the proposed drain fields are in a southwesterly direction toward the Indian River. The Indian River in the location of the proposed facility is a "Class III surface water." Groundwater in the area of the proposed facility might be classified as either "G-I" or "G-II." Reasonable assurance has been given that the proposed sewage treatment plant would not operate in such a manner as to degrade surface or ground waters to the extent that any of the Department's specific water quality parameters set out in Chapter 17, Florida Administrative Code, would be violated. The proposed sewage treatment plant comports with local requirements and has been approved by Brevard County. The Allans Subdivision is a residential development that is located directly to the north of the Beach Woods development. Petitioner utilizes a shallow water well as a source of drinking water. The proposed land application site of the sewage treatment plant is located within 500 feet of the Petitioner's well. There are at least two other shallow water wells that serve as drinking water sources located within 500 feet of the proposed land application site. The applicant indicated a willingness to move the proposed facility so that no part of it would be located within 500 feet of the shallow drinking water wells. The evidence establishes that the plant could be moved to accomplish that. No specific plan, however was presented. Potential factual issues could exist respecting appropriate buffer zones for any relocation of the facility, even a minor relocation. The applicant is proposing to develop areas within 100 feet of the proposed facility. The applicant does not, however, propose to locate any public eating, drinking, or bathing facilities within 100 feet of the proposed plant or land application area. No map was presented during the course of proceedings before the Department of Environmental Regulation that preceded the formal administrative hearing or during the hearing itself to establish present and anticipated land uses within one mile of the boundaries of the proposed facility. The facility of such a size that it could not inhibit any conceivable present or proposed future land uses except within 500 feet of the proposed facility. Evidence was offered at the hearing from which it could be concluded that the Department has, in the past, issued permits for sewage treatment plants located within 500 feet of existing shallow drinking water wells. The testimony was that this has occurred despite a requirement in the Department's rules that there be a 500-foot buffer zone between any such plant and a shallow drinking water supply. No specific evidence was presented as to why the Department has allowed such a breach of its rules or why it should be allowed in this proceeding.

Florida Laws (1) 120.57
# 1
R-BAR ESTATES, INC., ET AL. vs. CITY OF OKEECHOBEE AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 84-001277 (1984)
Division of Administrative Hearings, Florida Number: 84-001277 Latest Update: Jul. 13, 1984

Findings Of Fact Respondent City of Okeechobee (City) has applied to the Department of Environmental Regulation (Department) for a permit to construct a 0.6 mgd sewage treatment plant with land spraying as the method for effluent disposal. The facility will be used to provide secondary treatment of domestic waste for the City of Okeechobee. The location of the facility site will be north of the City of Okeechobee on Cemetary Road. It will be adjacent to R- Bar Estates, a residential subdivision, and the Florida School for Boys. This site is a suitable land site for the facility. Analysis of other sites has not produced a better site for the project. The waste material will be introduced into the plant where some solids will be removed. The wastewater will then move into the treatment tanks where bacteria will assimilate the nutrients. With secondary treatment, approximately 90 percent of the nutrients will be removed. The treated wastewater will then be disinfected with chlorine so as to maintain a chlorine residual of 0.5 ppm. The chlorination should destroy most if not all of the bacteria in the effluent. The method of treatment described above is a standard method. The design of the plant itself is quite common and, with the changes recommended by the Department, should be simple to maintain and should provide an acceptable level of treatment. If the plant is operated properly, the wastewater will meet all Department standards for secondary sewage treatment. Petitioner introduced no evidence at the hearing to establish that the plant itself could not be properly constructed or that the plant could not meet treatment levels. There are no noises or lighting at the plant which would carry to any residential areas. The plant itself is well removed from R-Bar Estates. While the sprayfields are located near R-Bar Estates, the only noise associated with the effluent disposal will be that of the small electric motor used to move the spray bars. The entire site will be enclosed by a fence so as to restrict access. The facility has been provided with a flow meter and with raw wastewater and finished effluent taps. The treated effluent from the plant is to be disposed of on sprayfields adjacent to the facility. Combined area of the sprayfields will be 310 acres. The sprayfield area consists of seven separate sprayfields. Each sprayfield will receive 1/2 inch of effluent per week, with each field receiving effluent one day per week. Prior to disposal of effluent, the entire site will be graded so as to eliminate low areas. Elimination of low areas on the site will reduce the possibility of effluent ponding on the site. The entire area of the sprayfield will be surrounded by a dike. The dike will prevent any surface waters or effluent from leaving the site. There will be no contamination of any waters from surface water runoff from the site. The facility has the capacity to store effluent for 90 days in the event of an unusually wet rainy season. That capacity allows the plant to retain all effluent for 90 days without any discharge in the event the sprayfields become saturated. The size of the pond may allow for some mosquito propagation but no mosquito problem is anticipated if the project is done properly and maintained. Mosquito propagation in holding ponds does occur in Florida. However, in every holding pond in which mosquito propagation has become a problem, it has been controlled by proven management techniques. The most common method of eliminating areas for mosquito propagation is to keep the side slopes of the pond free from vegetation. However, if that is not effective, adequate control may be achieved by use of chemical larvicides. In a pond of this size, chemical use is not as practical, but nonetheless remains as an alternative. The City of Okeechobee already owns the machinery necessary to mow around the perimeter of the pond. The holding pond area includes a separate pond which will accept effluent during times in which the plant upsets. During an upset, hydraulic or other factors may result in the plant producing inadequately treated effluent. That inadequately treated effluent will be pumped back to the head of the plant for further treatment. During the treatment process, ozone will be injected into the raw sewage. Ozone serves to reduce the smell of the sewage. Between the ozone treatment and the treatment at the plant, the finished effluent should have a very slight and innocuous odor. The application of effluent shall be accomplished by two methods. In four fields, effluent will be sprayed by an irrigator which moves in a circle from a central pivot. The effluent is sprayed down to the ground, thereby eliminating potential for aerosol drift. In the three fields furthest from inhabited areas, effluent is sprayed by a rolling unit which is pulled across the sprayfield. Trees and other vegetation at the property boundaries will eliminate any aerosol drift which may occur. There is a buffer of 200 feet from the edge of the sprayfield to the property boundary. It is in excess of 400 feet from the edge of the sprayfield to the nearest drinking water well. This distance should be adequate to keep any contaminants from reaching wells offsite. The nearest wells are all fully encased wells at approximately 100 feet or greater in depth. The plant described in the application and drawings is designed to provide Class I reliability pursuant to Florida Administrative Code Rule 17-6.040(4)(m). The primary constituents of the effluent will be water, nitrogen and phosphorus. Vegetation utilizes nitrogen and phosphorus in its growth process. When treated effluent is sprayed on a field, much of the nutrients remaining after treatment are assimilated by vegetation on the fields. Therefore the vegetation provides additional treatment for effluent beyond that provided in the plant. The types of vegetation to be grown in the Okeechobee sprayfields are Pangola grass and rye grass. Pangola grass, which is recommended for the area by the Soil Conservation Service, is a commercially valuable hay. Okeechobee intends to have a person contract with the City to harvest the hay four times per year. During the winter, when Pangola grass is dormant, rye grass will be planted and utilized to provide the same treatment. The facility will be surrounded by a series of monitoring wells which will allow early detection of contaminants leaving the property boundary. The wells will measure upstream and downstream groundwater. Nitrogen and phosphorus are not health related components of effluent. They are nutrient related standards and must exist in extremely high concentrations to have a health risk. However, if the monitoring wells pick up levels of nitrogen or phosphorus leaving the site boundary, a fund has been established for the construction of water mains to R-Bar Estates to provide residents of the area with city water. An adequate water supply to R-Bar Estates is assured. The soils in the project area consist of Myakka and Imokolee fine sand with pockets of other fine sands. An organic pan exists at elevations from 24 to 35 inches below the surface. The organic pan acts as a semi-confining layer. The permeability rate of the sands is approximately 12 feet per day. The organic layer rate is from 4 to 12 feet per day. As a part of the site preparation, the organic layer will be deep plowed to break up the layer and allow for a greater permeability rate. The permeability of the shallow water table is approximately 2 feet per day, and for purposes of doing calculations, in DER Exhibit 2, a rate of 2 feet per day was used. Based on all available data, the soils and vegetation at the site should be more than capable of assimilating and fixing the nitrogen and phosphorus load from the effluent. There is little or no risk of contamination of water sources off-site, including Taylor Creek. The City of Okeechobee has agreed to obtain a $3,000,00c policy of pollution insurance protecting against pollution of drinking water wells resulting from construction of the proposed wastewater treatment facility, and the City has the authority to obtain the insurance. There is no reverter clause in a deed from Okeechobee County to the State of Florida that would effect the use of the proposed site as a wastewater treatment facility.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that a Final Order be entered granting a permit to the City of Okeechobee to construct the wastewater treatment facility as proposed. DONE and ENTERED this 27th day of June, 1984, in Tallahassee, Florida. DIANE K. KIESLING Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904)488-9675 FILED with the Clerk of the Division of Administrative Hearings this 27th day of June, 1984. COPIES FURNISHED: Robert v. Kennedy, Esquire Post Office Box 968 Okeechobee, Florida 33472 Lester W. Jennings, Esquire Post Office Box 237 Okeechobee, Florida E. Gary Early, Esquire Department of Environmental Regulation 2600 Blairstone Road, Suite 654 Tallahassee, Florida 32301

Florida Laws (2) 120.57403.086
# 2
JOHN E. PILCHER, PHYLLIS REPPEN, ET AL. vs BAY COUNTY AND DEPARTMENT OF COMMUNITY AFFAIRS, 90-000254 (1990)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Jan. 16, 1990 Number: 90-000254 Latest Update: Jan. 10, 1992

Findings Of Fact During 1990, Respondent/Applicant, City of Lynn Haven, filed several applications with the Respondent, Department of Environmental Regulation, seeking the issuance of several permits to build a wastewater collection system and a two million gallon per day advanced wastewater treatment (AWT) plant. The proposed facility is intended to replace the wastewater treatment facility currently being used by the City of Lynn Haven. After a review of the applications the Department proposed several Intents to Issue covering the different aspects of the proposed projects. The Intents to Issue included: A) a variance and dredge and fill permit, pursuant to Sections 403.201, 403.918, 403.919, Florida Statutes, and Rule 17-312, Florida Administrative Code, authorizing a subaqueous crossing of North Bay (Class II waters) and installation of a force main (permit #031716641), B) a collection system permit, pursuant to Chapter 403, Florida Statutes, and Rules 17-4, 17-600 and 17-604, Florida Administrative Code, for the installation of approximately 11 miles of pipe from North Bay to the proposed treatment plant, C) a dredge and fill permit #031785181, pursuant to Sections 403.918, 403.919, Florida Statutes, and Rules 17-4, 17-312, Florida Administrative Code, authorizing 10 incidental wetland crossings associated with the collection system, and, D) a construction permit #DC03-178814, pursuant to Chapter 403, Florida Statutes, and Rules 17-4, 17-302, 17-600 and 17-611, Florida Administrative Code, authorizing the construction of a 2.0 mgd wastewater treatment plant. Sand Hill Community Improvement Association challenged the Department's Intents to Issue. The Sand Hill Community Improvement Association (Sand Hill) is an association composed of 74 formal members plus numerous supporters. Both members and supporters are residents who live near the site of the proposed Lynn Haven sewage treatment plant. They are sufficiently close to the plant site that construction of the proposed project could impact their property. The members are very concerned about any threat of pollution to the aquifer from the proposed plant since all of the members are dependent on private wells for their drinking water. Additionally, members of the association use the proposed site, as well as the associated wetlands, Burnt Mill Creek and the nearby lakes, for a variety of recreational purposes, including hunting, fishing, hiking, bird-watching, boating and swimming. Given these facts, the Association has standing to challenge the Department's Intents to Issue involved in this case. The City of Lynn Haven is located on a peninsular section of the south shore of North Bay and, except for its connection to the land, is surrounded by environmentally sensitive Class II or Class I waters. Lynn Haven's existing wastewater treatment plant was poorly designed, has not worked properly, and is old and outdated. The plant is permitted to treat up to 950,000 gallons per day. However, the existing plant is currently exceeding its originally permitted treatment limits and is treating in excess of 1,200,000 gallons per day. The sewage only receives secondary treatment, Secondary treatment is the minimum state standard for wastewater treatment. The secondarily treated wastewater is pumped several miles to a spray irrigation site located in the eastern portion of the City. The sprayfield site has never worked properly due to a high groundwater table and a confining layer of soil, both of which prevent the effluent from percolating into the ground. Because the sewage effluent cannot percolate into the ground, the existing operation frequently results in direct runoff into a ditch which empties into North Bay, a Class II waterbody. Such discharge of wastewater effluent into Class II waters is prohibited by Department regulations. 1/ At this time, the existing wastewater treatment facility is in violation of both DER and EPA standards and is under enforcement action by both agencies. The existing facility is currently operating without a permit and the Department has advised Lynn Haven that the existing facility as it now operates can not be permitted. In fact, all the parties agree that the City is in serious need of a wastewater treatment facility which works and does not pollute the environment. However, the parties disagree over the method by which proper wastewater treatment could be accomplished by Lynn Haven. Since 1972, the City, through various consultants and with the aid of DER, has reviewed approximately 40 alternatives for wastewater disposal. After this review, the City of Lynn Haven selected the alternative which is the subject of this administrative hearing. The alternative selected by the City of Lynn Haven consists of the construction of a proposed advanced wastewater treatment (AWT) plant and distribution system. The new plant will be on a 640 acre parcel of property located approximately 12 miles north of Lynn Haven. The location of the new plant will necessitate the rerouting of the wastewater from the old plant to the new plant by construction of a new transmission line approximately 12 miles north of the City across North Bay and parallel along State Road 77. 2/ The treatment process proposed for use in the new AWT plant is known as the AO2 process. The process is patented. The AO2 treatment process primarily consists of biological treatment with settling and filtration. The treatment process also includes a chemical backup treatment to further reduce phosphorus if necessary. The evidence demonstrated that this type of facility has been permitted by the Department in at least five other wastewater facilities throughout the state. The treatment facility will have a two million gallon per day, lined holding pond on site for the purposes of holding improperly treated wastewater for recirculation through the proposed facility. Any excess sludge generated by this treatment process would be routed to lined, vacuum-assisted, sludge drying beds. The sludge would then be transported offsite to a permitted landfill for disposal. The evidence demonstrated that this treatment process would not produce any objectionable odors. Once the wastewater is treated, it will be disinfected by chlorination to eliminate pathogens. The chlorination process is expected to meet state standards. After chlorination, a dechlorination process would occur to remove any chlorine residuals which would have a harmful affect on the environment. The treated wastewater would then be re-aerated and discharged through the distribution system indirectly into a wetland located on the 640 acre parcel of property. The quality of the treated wastewater is expected to meet the advanced wastewater treatment (AWT) standards. These standards are five milligrams per liter total suspended solids (T.S.S.), five milligrams per liter BOD, three milligrams per liter nitrogen (N), one milligram per liter phophorus (P). Ph will be in the range of six to eight units on an average annual basis and can be adjusted up or down if necessary to meet the ph levels of the ecology into which the wastewater ultimately flows. This effluent quality is approximately five times cleaner than secondarily treated effluent. Additionally, as a condition of the draft permit, the proposed facility would be operated by a state-licensed operator and would be routinely monitored to insure that the treated wastewater effluent meets advanced wastewater treatment standards. Given these facts, the evidence demonstrated that the applicant has supplied reasonable assurances that the plant will perform as represented and that the effluent will meet the state standards for advanced wastewater treatment. As indicated earlier, the site for the proposed AWT plant contains approximately 640 acres and is located approximately 12 miles north of Lynn Haven in an area known locally as the Sand Hills. The City specifically purchased this parcel of property for the construction of the proposed wastewater treatment plant. The plant itself would be located in the northeast corner of the property. The 640 acre site was previously used for silviculture. The entire area is currently planted in pines except for a low area that is dominated by a pristine, woody wetland system of titi. The titi wetland is approximately 212 acres in size and generally runs through the center of the property from the northeast to the southwest. The wetland is low in acidity, with an estimated ph between 4 and 5. The site consists of hilly, mineralized soils. The soils within the forested wetland are organic in nature. Based on the evidence at the hearing, there does not appear to be any significant confining layers of soil which would prevent the treated wastewater from percolating in the soils and draining towards the wetland and ultimately into Burnt Mill Creek, a Class III waterbody. Once the effluent leaves the plant, it would go through a distribution system. The proposed distribution system will consist of six, 500 foot long, 12 inch diameter perforated pipes. Each 500 foot section of pipe has 100 one and one-half inch orifices which will discharge the treated effluent onto an eight foot wide concrete pad. This concrete pad will dissipate the effluent's energy, prevent erosion at the orifice site and insure that the effluent sheetflows onto and eventually into the sandy soils of the plant site and ultimately into the receiving wetland. The distribution pipes are located around the east, north and western portions of the receiving wetland and are variously set back from the receiving wetland approximately 80 to 200 feet. The distribution system is designed with valves to allow for routing of flow to different branches of the system if it is determined through long term monitoring that there is a need to allow for any of the receiving wetland to dry out. None of the distribution branches are located in any jurisdictional wetlands of the State of Florida. The receiving wetland will receive a hydraulic loading rate of approximately 1.8 inches per week once the new advanced wastewater treatment plant is operating at capacity. Both the surface waters and groundwaters on the 640 acre parcel flow from northeast to southwest across the property. The evidence clearly demonstrated that any treated wastewater discharged on the site would move down hill by surface or groundwater flows towards the wetlands in the central portion of the property and eventually discharge into Burnt Mill Creek located at the southwest corner of the parcel. The evidence demonstrated that it would be highly unlikely for the surface or groundwater to move in any other direction and would be unlikely for the surface or groundwater to move towards any residents located to the north or east of this parcel. Evidence of the topography and its relatively sharp gradient clearly demonstrated that the treated wastewater discharged in the northeast corner of this site would not result in any significant still water ponding and would exit the site at the southwest corner of the property in approximately 14 hours. The evidence did demonstrate that, depending on the wetness of the weather, there may likely be certain times of the year when a flowing type of ponding would occur. However, this wet weather ponding was not shown to be of a duration which would impact to a significant degree on the flora and fauna of the area or increase the number of disease bearing mosquitoes in the area. As indicated earlier the treated effluent from the proposed AWT plant will flow into Burnt Mill Creek. Burnt Mill Creek will ultimately carry the treated wastewater approximately 11 miles down stream to North Bay. The City can directly discharge up to two million gallons per day of AWT water into Burnt Mill Creek without violating state water quality standards. Therefore, the volume of wastewater discharged into Burnt Mill Creek should not have significant impacts on surface and ground water quality. Moreover, Chapter 17-611, Florida Administrative Code, authorizes the discharge of up to 2 inches per week to receiving wetlands provided wastewater is treated to AWT standards. The evidence demonstrated that this rule was developed as an experimental effort to determine if wetlands could be appropriate areas for wastewater effluent to be either discharged or treated. These state limits were intended to be very conservative limits and were designed to insure that the impacts to receiving wetlands would be minimal. The evidence and testimony demonstrated that the receiving wetland system involved in this case should not be adversely impacted beyond those limits set forth in Section 17-611.500, Florida Administrative Code, for flora, fauna, macroinvertebrates, fish or vegetation and will meet all standards set forth in Chapter 17-611, Florida Administrative Code. However, it should be noted that the wetland/wastewater program is highly experimental and very little is known about the actual impacts of wetland/wastewater systems since facilities similar to the one proposed by Lynn Haven have not yet been placed in service. The evidence did show that there would be some long term impacts to flora and fauna in the wetland area primarily due to ponding, changed ph and the introduction of nutrients and pollution in the form of the effluent. However, the regulation does allow for some change within a receiving wetland and the evidence did not demonstrate that these changes would be significant or detrimental. Petitioners' own witness concluded that other deep wetland treatment systems are doing a very good job in meeting state water quality standards. Although Petitioners' expert noted potentially adverse impacts to flora and fauna from other wastewater treatment systems, these other systems were slow moving, impoundment-type systems that are not similar to the wastewater/wetlands system proposed by the City of Lynn Haven. The Lynn Haven system is designed for percolation and sheetflow, not ponding. Though there should be some expected changes, no evidence was provided that the receiving wetlands for the Lynn Haven facility would be affected to the extent there would be violations of any standard as set forth in Chapter 17-611, Florida Administrative Code. In essence, the legislature has determined that such experimentation with wetland areas is appropriate, albeit, even with the conservative limits of DER's rule, may prove to be a mistake. This facility is designed to fit within that rule and in fact is probably the best technology available for use in a wetland/wastewater situation. Finally, in order to avoid any potential impacts on the area which may over time become significant an approved monitoring program for surface water quality and affects on flora and fauna, as well as a groundwater monitoring program are required as conditions of the permit. The groundwater monitoring program has been designed to monitor any potential long term impacts to groundwater. With these protections there should not be any significant adverse impacts to surface or groundwater quality and the applicant is entitled to a construction permit for the AWT plant and distribution system. Lynn Haven's sewage would reach the proposed AWT plant through a transmission line. The transmission line would run from Lynn Haven's existing wastewater treatment plant across North Bay and through the unincorporated area of South Port. The Southport area is not sewered and utilizes individual septic tanks for its sewage. The transmission line would be constructed entirely in state road right-of-way. The line would terminate at the 640 acre site described above. A new, variable speed pumping station would be constructed adjacent to the old wastewater treatment plant. From this pump station, a 24 inch line would be constructed on City right-of-way up to the south shore of North Bay. At this point, the transmission line would be reduced in size to 20 inches and would be embedded approximately three feet below the Bay bottom. An additional variable speed pumping station would be located approximately half way along the 12 mile route of the transmission line to insure adequate pressure to pump wastewater to the new wastewater treatment plant. The pumps are to be employed to insure that the wastewater is continuously pumped uphill to the new site so that waste does not set, become septic, and create odor problems. The pumps are equipped to provide for chemical control of odor if necessary. Also, as a condition of the permit, the pumping stations are required to have backup power supplies should power be lost to the stations. The pumping stations and backup power supplies are to be tested monthly and the pumps are required to be continuously monitored by radio telemetry to insure they are operating properly. Additionally, the City of Lynn Haven will be required, as a condition of the permit, to visually inspect the entire length of the wastewater transmission line three times per day. The portion of the transmission line which would cross North Bay is approximately 3000 feet in length and would be constructed of high density polyethylene pipe (HDPE) with a wall thickness of one and one-half inches. HDPE pipe is used to transport materials such as hazardous wastes where leakage is not permissible. This type of pipe is virtually inert in that it is highly resistant to corrosion and other chemical reactions. It is also impact resistant and has a very high tensile strength. The pipe comes in 40 foot segments and is heat welded (fused) together. This type of joint significantly reduces the chance of any leakage. In fact, leakage around pipe joints is more likely to occur with other types of pipe and pipe connections. HDPE pipe is currently carrying wastewater across Watson Bayou in Bay County, Florida. 3/ There have been no reported problems with leaks or breaks occurring in the pipe crossing Watson Bayou. Given these facts, the probability of the proposed HDPE pipe leaking or breaking is extremely low, albeit not impossible, and such pipe appears to be the best material available for constructing a wastewater treatment transmission line across protected waters of the State. As a condition of the construction permit, the portion of the transmission line crossing North Bay will be required to have isolation valves at each end so that the pipe may be completely isolated in the event that it needs repair. The underwater portion of the line would be visually inspected by a diver twice per year and the line would be pressure tested before being placed into service. Additionally, pressure tests would be performed once a year. The construction permit also requires Lynn Haven to periodically inject dye into the proposed transmission line to check for any small leaks that may not otherwise be detected. Finally, the HDPE pipe would also be equipped so that television cameras could be inserted into the pipe to routinely inspect the interior of the pipe. In the event the HDPE portion of the transmission line would need to be repaired, the line could be immediately, temporarily repaired by a dresser coupling. A permanent repair could then be made in less than 24 hours once the material and equipment were staged at the site. The City intends to locally stockpile all necessary parts and equipment to effect any required repair to prevent any delay beyond four days. Permanent repairs would be accomplished by floating the line to the surface. The area needing repair would be cut out and a new section would be put in place by heat fusion. The line would then be pressure tested to insure the absence of leaks and placed back into service. During this process, the line would be taken out of service by the isolation valves and flow would be diverted to the eight million gallon holding ponds at the City of Lynn Haven's existing facility. These holding ponds can hold four days worth of wastewater from the City of Lynn Haven. Lynn Haven is required, as a condition of the construction permit, to have this reserve capacity as well as have a contractor on standby to make any repairs in the event such repairs are necessary. All of the technical specifications for the transmission system and the operating conditions imposed on it are designed to insure that the system does not fail or develop any leaks which could impact receiving waters, including North Bay. Given the permit conditions, the required inspections for leaks, the sound engineering design and quick repair methods proposed, the evidence demonstrated that the probability of any leak occurring in the portion of the transmission line crossing North Bay is extremely low and that if such a leak does occur any potential harm to the environment will likely be limited and quickly eliminated. The evidence demonstrated that the design of the transmission line and permit conditions provide reasonable assurances that the transmission line will meet or exceed the Department standards set forth in Chapter 17-604, Florida Administrative Code. Therefore, the applicant has provided reasonable assurances that the transmission line/collection system will not violate Department standards or rules and the applicant is entitled to a permit (permit #CS03-178910) for the proposed collection system. In addition to requiring a construction permit/collection system permit for the wastewater transmission line, the line will also require dredge and fill permits and a variance for crossing waters of the state. There are ten incidental crossings of state waters and one major crossing o f North Bay. Of the ten incidental crossings, two are over small creeks (Scurlock and Little Burnt Mill) These two incidental creek crossings will be accomplished by placing the transmission line (ductile iron pipe) on top of pilings placed in the water. Best management practices such as turbidity curtains and other erosion control practices are proposed and required by the permit to minimize construction impacts on water quality. The only impacts to wetland resources would be from the placement of the pilings. The evidence demonstrated that any impact would be minimal and not significant. The evidence did not demonstrate that the aerial crossings would have any long term water quality or environmental impacts. The remaining eight incidental crossings of waters of the state consist of small, seasonally wet ditches which would be traversed by trenching and burying the transmission line. Again, turbidity controls such as curtains and hay bales would be employed to protect water quality. The evidence did not demonstrate that any significant long term or short term impacts to resources of the state would occur. The evidence did demonstrate that the applicant has provided reasonable assurances that water quality standards would not be violated in regards to these 10 incidental water crossings. Likewise, the evidence demonstrated that the construction of these 10 incidental water crossings would not be contrary to the public interest. Therefore, the applicant is entitled to issuance of a dredge and fill permit (permit #031785181) for these 10 water crossing. However, a much harder question arises in relation to the dredge and fill permit and the variance required for the 3,000 foot segment of the wastewater transmission line which crosses North Bay. Pursuant to Rule 17- 312.080(7), Florida Administrative Code, permits for dredging and filling activity directly in Class II waters which are approved for shellfish harvesting by the Department of Natural Resources (DNR) shall not be issued. The reason for the rule is that any pollution caused by dredging and filling and, as in this case, the permanent placement of a sewage pipe in food producing waters could potentially have catastrophic effects on more than just the environment but on local employment in the shellfish industry and the quality of food available to the State. Put simply, the Department has determined by enacting its Rule that the public interest in food producing waters far outweighs any other consideration or criteria under Sections 403.918 and 403.919, Florida Statutes, in determining whether dredging and filling should take place in Class II, shellfish waters. In other words, it is not in the best interest of the public to allow dredging and filling so that a pipe carrying raw sewage can be placed in shellfishing waters. However, irrespective of this determination, the Department believes that, pursuant to Section 403.201(1)(c), Florida Statutes, it may grant a variance from its rules to relieve a hardship. As indicated earlier, North Bay is a Class II waterbody, conditionally approved for shellfishing. North Bay, therefore, falls within the Rule's prohibition against dredging and filling in Class II waters and the City is required to demonstrate the presence of a hardship in order to vary the Rule prohibition and obtain a dredge and fill permit for the North Bay crossing. On issues involving variances, the Department employs a two step analysis. The first part of the analysis is whether a hardship is present and the second is whether, if the variance were granted, would it result in permanent closure of Class II shellfish waters. The Department correctly recognizes that the question of whether a hardship exists is a question of fact and is determined on a case-by-case basis. Surprisingly, in a kind of "what we don't know can't hurt" posture the Department reviews a request for a variance standing alone based on the application as it is presented and does not require analyses of other possible alternatives to the granting of a variance. However, the existence of any alternatives, costs of any alternatives, timeliness of any alternatives, problems with any alternatives, whether an alternative represents a short term or long term solution to a given problem and the implementability of any of the alternatives are all factors utilized by the Department in determining whether or not to grant a variance. The Department's policy of non- review makes no sense, either factually or statutorily, when the Department is faced with varying a prohibition it created in its own rules. Similarly, the Department's policy of not requiring other alternatives to be examined before granting a variance goes against the fact that an applicant has the burden to establish entitlement to a permit and, in the case of a hardship variance, that a hardship exists because reasonable alternatives to granting a variance are not available. 4/ Likewise, the second part of the Department's hardship analysis relating to the permanent closure of shellfishing waters makes no sense given the fact that a non-permanent closure of shellfishing waters may have the same or just as serious effect on employment in the shellfishing industry, the loss of income due to an inability to earn a living in that industry and health risks posed by contaminated seafood. Temporary loss of income or a livelihood can, for all practical purposes, have consequences to the persons directly affected by a temporary closure of shellfishing waters similar in nature those caused by the permanent closure of shellfishing waters. The same can be said for health risks posed by a contaminated food supply. Rule 17-312.080(7), Florida Administrative Code, does not contain any exceptions for the temporary closure of shellfish waters. Nor is the rule limited to instances of permanent closure. Permanent closure is simpy not required in order to support a hardship under Section 403.201, Florida Statutes. Moreover, neither step in the Department's two-step analysis is included in any Rule promulgated by the Department. 5/ Without such a Rule, it is incumbent upon the Department or the applicant to demonstrate the underpinnings for this non-rule policy. No such evidence was presented at the hearing. In fact, the evidence presented at the hearing affirmatively demonstrated that the Department's non-rule policy violated both its own rules and the statute under which it is trying to proceed. As indicated, the issue of hardship is a question of fact and involves a weighing of all the facts and cicumstances involved in this project. In this case, there are shellfishing areas located close to the proposed location of the transmission line. North Bay is sometimes closed to shellfish harvesting by the Department of Natural Resources. These closures generally occur during wet weather conditions and are due to stormwater runoff and the failure of septic tanks in Southport. 6/ Additionally the current Lynn Haven system also contributes to the closure of North Bay. No competent, substantial evidence was provided that issuance of the permit and variance would result in the permanent closure of shellfish waters. The location of the proposed transmission line would be several hundred feet west of the Bailey Bridge embedded in the Bay floor. 7/ The proposed alignment of the transmission line through North Bay is in an area which is relatively biologically unproductive. The proposed placement of the transmission line avoids the few grassbeds that exist in the nearshore shallow areas except for approximately 200 square feet of grass. During construction of the line, these grasses would be removed immediately before the line is placed in a trench and then would be promptly replanted in the same area. The evidence demonstrated that the affected areas of grass should be able to reestablish itself. The evidence further demonstrated that there would not be any long term adverse impacts to these aquatic resources and there should not be any significant long term impacts on the balance of any aquatic life which may exist on the bay bottom. Water quality during construction will be protected by use of turbidity controls to control sediments. Therefore, any short term impacts on aquatic resources are likely to be insignificant. Concerns about long term adverse impacts to Class II waters are greatly reduced by the type of pipe and conditions in the permit which require that the transmission line be routinely inspected and tested to insure that there is no leakage and that in the unlikely event the line should need to be repaired, the line could be easily isolated and quickly repaired. The evidence showed that, to completely avoid Class II waters, the line could be moved several miles to the west or east of the line's proposed location or be placed over or under the Bay. If the line was moved west to the extent that it was in Class III waters, it would be over 40 miles long and would more than double the cost of the project. If the line was moved several miles to the east, it would go through the Deer Point Lake Watershed. The watershed is a Class I water supply for Bay County. Clearly, moving the line either west or east is not practical nor realistically feasible. Tunneling under North Bay would be very risky and is not technically feasible. The length of the tunnel would require steel pipe to be used. If tunneling could be done at all steel pipe would not provide the level of protection afforded by the HDPE pipe proposed by Lynn Haven. Placing the transmission line on pilings for an aerial route over North Bay is uneconomical and would create a potential hazard to navigation. Moreover, an aerial crossing would not solve any pollution problems should the transmission line leak or break and would also still involve a variance request since it would be necessary to dredge and fill in Class II waters for the placement of pilings or supports. Put simply, the evidence, showed that there was no realistic way to avoid Class II waters in North Bay given the location of the proposed wastewater treatment facility. A location which the City knew would require a hardship variance from the rule prohibition of dredging and filling in Class II, shellfishing waters. A hardship which the City created by site selection and which it hoped to overcome by strenuous permit conditions and futuristic speculative benefits to unsewered areas of the County. The existing treatment facility is operating in violation of both EPA and DER requirements, has been issued a notice of violation, is nonpermitted and is destined to be operating under a consent order. The system is hydraulically overloaded, handling approximately 1.2 million gallons per day while its rated capacity is 950,000 gallons per day. Refurbishing Lynn Haven's existing wastewater treatment facility would not be viable since the plant has outlived its useful life, is of a very poor design and probably could not be made to function within Departmental standards and water quality standards. The existing sprayfield does not function and results in overland flow of effluent which discharges to Class II waters. The high water table and presence of a semiconfining layer on the Lynn Haven peninsula virtually guarantee such discharges. Further, the plant only provides secondary treatment. Put simply, Lynn Haven needs another method of handling its sewage. The only remaining alternative to a Bay crossing is to tie into the existing Bay County system and any AWT wastewater treatment plant Bay County may build in the future. 8/ The existing Bay County system provides at most only secondary treatment. The Cherry Street facility, which is part of that system, functions essentially as a lift station rather than a treatment facility. The Military Point Lagoon portion of the system is nonpermitted and is operating under a consent order and has been the subject of enforcement action. The Department has an extensive agreement with Bay County requiring a significant and long term series of actions to deal with their wastewater treatment system. The modifications or improvements to the Bay County system to provide advanced treatment are not imminent and the final system conditions cannot now be determined as they will depend in large measure upon data and analysis remaining to be collected. Currently, the existing Bay County system processes a significant amount of industrial discharge and has a problem with phenols most likely due to industrial waste from two discreet industrial facilities in the County. 9/ However, all of Bay County's wastewater system problems are reasonably solvable and will be corrected in the near future, if they have not already been corrected. Additionally, the amount of sewage Lynn Haven would be sending into the current Bay County system probably would not significantly impact that system and its problems or the County's ability to solve those problems. The County is willing to accept Lynn Haven's sewage into its system and future AWT system. The connection into Bay County's system is a viable alternative currently in existence. Moreover, as indicated, Bay County has a long range plan to build an advanced wastewater treatment plant. As yet the plan remains "just a twinkle in the County's eye" and has not progressed to the design stage. However, this plan, of necessity, will eventually become reality in the next 5 to 10 years. The estimated cost to a Lynn Haven user for the Bay County conceptual system will be $25.00 per month in lieu of $15.00 for the proposed Lynn Haven system. These estimates are at best speculative. However, this cost estimate is not excessive given the fact that a Lynn Haven user lives in an environmentally sensitive area and a Bay County hook-up would eliminate the need to run a sewer pipe through food producing, Class II waters. 10/ Based on these facts, the evidence demonstrated that it was feasible for Lynn Haven to hook into Bay County's wastewater system without creating any more environmental impacts than that system is already experiencing and must solve and which, to a significant degree, have already been solved by Bay County. Given the existence of this alternative to crossing food producing waters and the fact that any future benefits are just as likely to be provided just as quickly by the County through AWT facilities, the applicant has failed to demonstrate the necessity for crossing North Bay and failed to demonstrate entitlement to a hardship variance for that crossing. Therefore, the applicant is not entitled to either a dredge and fill permit or variance for the proposed North Bay crossing.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is, recommended that the Florida Department of Environmental Regulation enter a final order issuing permit applications CS03178910, DC03178814, and 031785181, and denying the variance and permit number 031716641. RECOMMENDED this 27th day of November, 1991, in Tallahassee, Florida. DIANE CLEAVINGER Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 27th day of November, 1991.

Florida Laws (5) 120.57120.68403.087403.088403.201
# 3
FRANK AND MARY WAGONERS vs. FLORIDA MEDICAL FACILITIES, INC., AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 85-002257 (1985)
Division of Administrative Hearings, Florida Number: 85-002257 Latest Update: Jan. 30, 1986

Findings Of Fact The permit Applicant and Co-Respondent, Florida Medical Facilities, Inc. is the owner and developer of a 60-acre tract of land upon which it has constructed a hospital and will construct various attendant laboratories, medical offices and the like. Additionally, the Applicant is the owner of approximately five acres of land adjacent to its original 60-acre site which lies on Morningside Drive in Englewood, Sarasota County, Florida. The Applicant proposes to construct and operate the wastewater treatment plant on that 5-acre parcel. The Applicant proposes to construct an extended aeration wastewater treatment plant and effluent disposal drain field system which will accommodate and dispose of all wastewater effluent on the site by the absorption bed, land application method. The proposed sewage treatment plant will have an average daily design flow capacity of 50,000 gallons per day. The anticipated peak flow of the treatment plant will be 60,000 gallons per day. The plant will generate and dispose of approximately 900 gallons of waste sludge on a daily basis. The facility would employ dual drain fields, use of which would be rotated on a weekly basis. The proposed average hydraulic loading rate would be 3.21 inches per day or two gallons per day, per square foot of drain field. The proposed facility will serve a 100-bed community hospital, assorted medical offices, a diagnostic laboratory and a 75-bed nursing home. The permit applicant has agreed and stipulated that chemical, nuclear and other hazardous and noxious waste materials, blood, body parts, medicines, and drugs will not be introduced into the sewage treatment system plant or drain fields. The Applicant (FMF) originally proposed to dispose of sewage effluent emanating from its hospital and other facilities by transmission of it through force-mains to existing public wastewater systems, one of which is in Charlotte County and the other in Sarasota County. After exploring these possibilities, these alternatives proved to be either too expensive or to involve transmission of effluent over too great a distance to make these options feasible. Sarasota County has a local pollution control program approved by the DER, pursuant to Section 403.182, Florida Statutes. Under this program the Sarasota Environmental Service Department reviews domestic wastewater treatment facility permit applications pending before the DER and makes recommendations on their disposition. The county's ordinance concerning such facilities is equivalent to the DER standards, except in some respects it is stricter Mr. Russell Klier of the county environmental services department established that the proposed project as planned and designed, will comply with county ordinances regarding wastewater treatment plants. Indeed, it was established through Mr. Klier's testimony, that the proposed project has more redundancy and reliability safeguards than any other such project presently operating in Sarasota County. The proposed sewage treatment plant and disposal system is designed to attain the secondary level of treatment required by Chapter 17-6.060, Florida Administrative Code. The effluent disposal system will provide for disposal of effluent in an absorption field system as envisioned by Chapter 17-6.040(4)(M), Florida Administrative Code and the Department's "Land Application Manual," incorporated by reference in that rule. The system, as proposed, will have the additional safeguards required by the "Land Application Manual" in order to attain "Class I reliability." The hospital, which is the initial facility to be constructed on the 60-acre site, is largely completed, and is being served by a temporary "package" sewage treatment plant until the permit application is resolved. The package sewage treatment plant, as well as the proposed plant and drain field land application system will only serve the medical center complex. All on-site stormwater and surface water run-off from both the 60-acre original medical center site, as well as the 5- acre proposed sewage treatment plant and disposal site, will be managed by directing stormwater and surface water run-off to holding ponds to be constructed and maintained on the original 60-acre site. Steven Houghton was accepted as an expert engineering witness. It was thus established that the system as designed will meet all water quality parameters regulated and enforced by the DER and Sarasota County in terms of the quality of the effluent generated by the plant and disposal system for disposal by land application. In this connection, he established that no nuclear, infectious, toxic or noxious waste will be processed by the system or introduced into the system nothing other than domestic-type sewage will be treated, processed and disposed of by the proposed system. Mr. Houghton acknowledged that the project will be located in an historically flood-prone vicinity, but that will not affect the quality or effectiveness of the operation of the plant nor the safe disposal of the resulting effluent. In that regard, the Applicant will place fill at the drain field site so as to provide a more effective soil percolation condition than that presently existing in the soils at the drain field site. Additionally, the Applicant will provide a sewage storage tank to provide extra reliability and avoidance of pollution caused by sewage overflows in the event of any excessive sewage flows into the plant, and as a safeguard against disposing of insufficiently treated effluent during periods of high rain and high surface or ground water conditions. Additionally, the system will be constructed and operated with sufficient redundancy of electrical and mechanical components so as to provide auxiliary capacity throughout the system, allowing it to operate efficiently 24 hours a day and to continue to provide treatment and disposal of the effluent in accordance with secondary treatment and Class I reliability standards, even during periods of mechanical or electrical outages. Petitioner Mary Wagoner owns and resides on acreage generally south and adjacent to the proposed project site. Mrs. Wagoner uses a potable water well in the shallow aquifer with a depth of approximately 35 feet. Mrs. Wagoner's well has recently been tested and at this time provides good, safe, potable water which she uses both for drinking, cooking, domestic usage, as well as water for her livestock. Mrs. Wagoner's well is less than 500 feet from the proposed "wetted area" of the drain field land application disposal site. Mr. Edward Snipes was accepted and testified as an expert witness in the areas of engineering and wastewater engineering on behalf of the Department. He corroborated Mr. Houghton's testimony in establishing that the project would meet the Department's standards for water quality and Class I reliability in large part. It was shown that the project will not likely have harmful effects on the Petitioners' water wells. Mr. Snipes established that the Department's "Land Application Manual" embodied in Rule 17-6.04(4)(Q), Florida Administrative Code requires a buffer zone of only 100 feet, instead of 500C feet, from the wetted area of the sewage effluent disposal site, due to the type of system and level of treatment proposed. That is, the system would provide secondary treatment, with additional safety measures incorporated in the design and operation so as to achieve Class I reliability. This Class I reliability standard includes a sufficiently high rate of disinfection so as to allow unrestricted public access to the site, and thus would meet the most stringent Class I reliability standards extant in Rule 17- 6.040(4)(M), Florida Administrative Code. This permits a reduced buffer zone between the wetted area of the drain field and any adjacent, shallow-water wells. Thus, the buffer zone would, in the case of this plant, be allowably reduced from 500 feet to 100 feet. In only one respect, was any doubt cast by Petitioner's testimony and evidence on the showing of reasonable assurances that all Department water quality and wastewater treatment standards will be met. That doubt concerns the distance from the bottom of the drain field to the water table elevation at the drain field site, as that relates to the ability of the system to continue to treat and dispose of effluent within appropriate standards in this admittedly flood-prone area, as that problem would in turn relate to potential contamination of ground water in the area, especially in times of high rainfall and high ground water levels. In that connection, Petitioner Wagoner offered Herman Weinberg as an expert witness in civil engineering and he was accepted. Mr. Weinberg acknowledged that he was not a soil engineer and acknowledged that the Department or its witnesses were more knowledgeable about wastewater regulation, treatment and disposal methods than he. He opined, however, that the plant may not be able to reach Class I reliability due to its location in a flood-prone area. He fears that insufficient soil testing and water quality testing had been done prior to the filing of the permit application. and prior to the ultimate construction of the project, if that is to be the case. Section 17-6.040(4) (M), Florida Administrative Code, adopts by reference the United States Environmental Protection Agency design criteria for mechanical, electrical and fluid system and component reliability manual. That manual sets forth certain minimum standards for Class I reliability sewage treatment and disposal plants and systems. In this regard, the rule in that manual establishes that wastewater treatment works include holding ponds and basins and other structures of the disposal system. It provides that all treatment works, structures, as well as electrical and mechanical equipment, shall be protected from physical damage by flooding of a magnitude occurring on the average of once in a hundred years, the so- called "100-year flood." In this connection, it was established through witness Weinberg's testimony as well as that of Mr. Houghton, the Applicant/Respondent's witness, that the 100-year flood plan elevation on and around the subject site is 12 feet above mean sea level. The top of the proposed drain field would be located at 12.33 feet elevation. The bottom of the drain field would be at 10.33 feet elevation. The water table level established by witness Houghton as a result of his survey and calculations, is at 8.33 feet elevation. The Department of Environmental Regulation, in its "Land Application Manual," which provides criteria for sewage plant and disposal system construction and operation, requires a 36-inch minimum separation between the bottom of a drain field and the design water table level. Thus, the legally operative Class I reliability standards, incorporated in the above-referenced rule and manuals, and which the Applicant and the Department agree is the level of reliability required, given the conditions and the proximity of Petitioner's well, can only be met if the drain field disposal system is at this required elevation of 36 inches above the design water table level. Affirmative, reasonable assurances that this safeguard will be incorporated in the subject system are necessary in view of the fact that Petitioner Wagoner's potable water well is clearly less than 500 feet from the wetted area of the drain field site. In this connection, the Applicant/Respondent has proposed placing fill soil of a suitable type for adequate percolation and land application treatment of the effluent on the drain field site, however, it has not been established that this will be done to such an extent as to raise the elevation of the drain field sufficiently so that the bottom of the drain field is a minimum of 36 inches above the design water table. The installation of an adequate depth of fill soil of a suitable percolation characteristic must therefore be a condition on the issuance of the permit. Further, in that regard, the Applicant/Respondent's soil test and calculation of tile ground water level or "design water table," occurred in January and February of 1985, at a time when the southwest region of Florida was in a drought or dry condition, such that the water level or ground water table at normal rainfall conditions would likely be at a higher elevation. Thus, a grant of this permit must be conditioned upon the installation of sufficient, appropriate quality fill soil to ensure that the minimum 36-inch separation between the drain field bottom and the water table is maintained during normal water table or rainfall conditions. If this measure is not taken, given the 2-foot separation between the drain field, as designed, and the water table, the oxygen transferring capacity of the soil beneath the drain field may not be sufficient to satisfy the oxygen demand required for consistently adequate treatment and safe disposal of the sewage effluent. Additionally, in this same context, Chapter 1 of the DER Land Application Manual at Section 1.3, requires that sufficient storage capacity exist on-site to ensure retention of sewage effluent during conditions which preclude land application, such as high ground water conditions or flooding conditions. This capacity should be equivalent to three days maximum daily flow at the design capacity of the plant, or in this case, 180,000 gallons. Although the Applicant, by its plans and specifications in evidence, has assured that a sewage effluent storage tank will be constructed and operated, it has failed to establish that sufficient storage capacity will be incorporated to assure the retention of 180,000 gallons of effluent. Any grant of the permit application should be conditioned upon such an assurance. Finally, in connection with the above-mentioned condition concerning installation of sufficient, appropriate soil filling to allow for a minimum 36-inch amount of unsaturated soil beneath the drain field, that addition of fill should also be of a sufficient type and amount to ensure that the Applicant's proposed rotation or "resting" of drain fields for 7-day periods will be adequate to ensure that the subject amount of soil is unsaturated before re-use of either of the two drain fields. There should be incorporated in these conditions, upon a grant of the permit, the requirement that the Department monitor construction of the proposed facility to ensure that the above conditions are adequately met, in view of the low-lying terrain at the drain field site and the flood-prone condition of that locality. Petitioner Mary Nygaard testified on behalf of herself and her husband, Lyle A. Nygaard. Mrs. Nygaard complains of feared pollution of her shallow-water potable well which she maintains is within 500 feet of the drain field and sewage plant site. Mr. Nygeard established that the well is 187.1 feet from the Petitioner's southern property boundary, but acknowledged that no survey has been done delineating the distance to the proposed wetted area of the drain field. It was not otherwise proven how far the Nygaard's potable well is from the wetted area of the proposed drain field where the effluent will be disposed of. Various easements and roadways lie between the Nygaard's well and the wetted area of the proposed drain field site with indeterminate dimensions, thus it was not proven what distance exists between the Nygaard's well and the drain field site other than that it exceeds 187.1 feet.

Recommendation Having considered the foregoing Findings of Fact and Conclusions of Law, the evidence of record, the candor and demeanor of the witnesses and the pleadings and arguments of the parties, it is, therefore RECOMMENDED: That the application of Florida Medical Facilities for a permit authorizing construction of an extended aeration, wastewater treatment plant and disposal system to serve only the Englewood Hospital and Medical Center project in Englewood, Sarasota County, Florida, referenced above be GRANTED, provided that the above-delineated conditions upon a grant of the permit are complied with. DONE and ENTERED this 30th of January, 1986 in Tallahassee, Florida. P. MICHAEL RUFF, Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 30th day of January, 1986. COPIES FURNISHED: Lyle and Mary E. Nygnard 740 Morningside Drive Englewood, Florida 33533 Harlan Domber, Esquire ISPHORDING, PAYNE, KORP and MUIRHEAD, P.A. 333 West Miami Avenue Venice, Florida 33595 James H. Burgess, Jr., Esquire SYPRETT, MESHAD, RESNICK and LIEF, P.A. Post Office Box 1238 Sarasota, Florida 33578 Douglas L. MacLaughlin, Esquire Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32301 Victoria Tschinkel, Secretary Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32301 APPENDIX The following specific rulings are made on the proposed findings of fact submitted by the parties to the extent that the proposals actually constitute proposed findings of fact as opposed to recitations of testimony and evidence, conclusions and arguments of law. APPLICANT/RESPONDENT'S PROPOSED FINDINGS OF FACT Rejected as constituting a mere discussion of evidence presented or not presented. Rejected as constituting a mere discussion of evidence presented or not presented. Rejected as constituting a mere discussion of evidence presented or not presented. Rejected as constituting a mere discussion of evidence presented or not presented. Rejected as constituting a mere discussion of evidence presented or not presented. Rejected as constituting a mere discussion of evidence presented or not presented. Rejected as constituting a mere discussion of evidence presented or not presented. Additionally, paragraph 7 constitutes a conclusion of law. Rejected as constituting a mere discussion of evidence presented or not presented. Rejected as constituting a mere discussion of evidence presented or not presented. Rejected as constituting a mere discussion of evidence presented or not presented. Rejected as constituting a mere discussion of evidence presented or not presented. Additionally, paragraph 11 constitutes in part a conclusion of law. Rejected as constituting a mere discussion of evidence presented or not presented. Rejected as constituting a mere discussion of evidence presented or not presented. Accepted, but this proposed finding of fact is unnecessary and immaterial to a resolution of the material issues presented. Rejected as constituting a mere discussion of evidence presented or not presented. Rejected as constituting a mere discussion of evidence presented or not presented. RESPONDENT/DEPARTMENT OF ENVIRONMENTAL REGULATION'S PROPOSED FINDINGS OF FACT Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted. Accepted as modified by the Findings of Fact and Conclusions of Law in the Recommended Order concerning the conditions which must be met before the permit should be granted as that relates to Class I reliability standards and the "buffer zone" issue. Accepted, but modified by the Findings of Fact in the Recommended Order concerning the necessity of the installation of a minimum 36-inch adequate soil percolation zone and adequate sewage effluent storage capacity. Accepted in part, but rejected to the extent that this proposed finding of fact maintains that the nature of Mrs. Wagoner's well has been impossible to obtain due to her refusal to allow inspection. Indeed, Mrs. Wagoner adduced competent evidence of the water quality in her well. Accepted in part, but modified by the Findings of Fact in the Recommended Order concerning the additional conditions that should be placed upon the permit related to its location in a flood-prone area, and related to the distance between the bottom of the drain field and the high water table. Accepted. Accepted, but modified by the Findings of Fact in the Recommended Order concerning the conditions referenced above which must be met for Class I reliability and for avoidance of harmful effect on Petitioner's water well. Accepted. Accepted. Accepted.. Accepted, but modified by the Findings of Fact in the Recommended Order concerning additional conditions referenced above which must be met concerning Class I reliability and protection of water quality in Petitioner's-well. Accepted. Accepted. Accepted. Accepted. Accepted. Rejected as constituting merely a discussion of testimony. Accepted. Accepted. Accepted. Accepted, but this proposed finding is irrelevant to a resolution of the material issues presented. Accepted. Rejected as merely being a recitation of testimony. Accepted. PETITIONER WAGONER'S PROPOSED FINDINGS OF FACT Accepted. Accepted. Accepted. Accepted. Accepted. Accepted, except to the extent that it indicates the applicant will situate the facility in a manner so as not to be accessible to the general public. Rejected as not comporting with the competent, substantial, credible evidence presented. Rejected as not comporting with the competent, substantial, credible evidence presented. Rejected as not comporting with the competent, substantial, credible evidence presented. Rejected as not comporting with the competent, substantial, credible evidence presented. Rejected as not comporting with the competent, substantial, credible evidence presented. Rejected as constituting a discussion and conclusion of law. 13 and 14. Rejected. These two proposed findings in reality constitute discussion and conclusions of law. 15 and 16. Rejected. These two proposed findings in reality constitute discussion and conclusions of law. They are rejected for the additional reason that portions of those two paragraphs that constitute proposed findings of fact do not comport with the competent, substantial, credible evidence and testimony presented. 17 through 31. These proposed findings are rejected as constituting conclusions of law and, to the extent that they embody proposed findings of fact, are not supported by the competent, substantial, credible evidence and testimony presented. The evidence and testimony shows that reasonable assurances (except as to the permit conditions recommended) have been provided that all pertinent regulatory criteria have been or will be met. The EPA Manual criteria referenced in these proposed findings of fact (17-31) are not mandatory, whereas those in Subsection (4)(q) of the above-referenced rule are mandatory and have been reasonably assured by the applicant to be met subject to the conditions recommended on a grant of the permit by the Hearing Officer. Accepted, except to the extent that the applicant is reputed not to have provided data to substantiate the estimated design water table. The applicant's proof of the water table elevation was un-refuted. Accepted as to the first sentence, the remaining portion of that proposed finding of fact is irrelevant and unnecessary to a disposition of the material issues presented. Rejected as not comporting with the competent, substantial, credible testimony and evidence presented. Rejected as not comporting with the competent, substantial, credible testimony and evidence presented. Rejected as not comporting with the competent, substantial, credible testimony and evidence presented. Rejected as not comporting with the competent, substantial, credible testimony and evidence presented. Rejected as not comporting with the competent, substantial, credible testimony and evidence presented. Accepted to the extent that the conditions recommended to be attached to a grant of the permit envision assurance being provided before a grant of the permit that the issue raised by proposed finding No. 39 is satisfied. Accepted. Accepted as to its second sentence, the first sentence in that proposed finding is rejected as not comporting with the competent, substantial, credible testimony and evidence presented, and as being unnecessary to a resolution of the material issues presented. Accepted. Rejected as not comporting with the competent, substantial, credible testimony and evidence presented. Rejected as constituting a conclusion of law. Rejected as constituting a conclusion of law. Rejected as constituting a conclusion of law. 47. Rejected as constituting a conclusion of law. 48. Rejected as constituting a conclusion of law. 49. Rejected as constituting a conclusion of law. 50. Rejected as constituting a conclusion of law. 51. Rejected as constituting a conclusion of law. 52. Rejected as constituting a conclusion of law. 53. Rejected as constituting a conclusion of law. 54. Accepted. 55. Rejected as constituting a conclusion of law. 56. Rejected as constituting a conclusion of law. 57. Rejected as constituting a conclusion of law. 58. Rejected as constituting a conclusion of law. 59. Rejected as constituting a conclusion of law. 60. Rejected as constituting a conclusion of law. 61. Rejected as constituting a conclusion of law. 62. Rejected as constituting a conclusion of law. 63. Rejected as constituting a conclusion of law. 64. Rejected as constituting a conclusion of law. 65. Rejected as constituting a conclusion of law. 66. Rejected as constituting a conclusion of law. 67. Rejected as constituting a conclusion of law. 68. Rejected as constituting a conclusion of law. 69. Rejected as constituting a conclusion of law and for the additional reason that the last sentence is a proposed finding of fact not supported by competent, substantial credible evidence and testimony presented. Rejected as constituting a conclusion of law and for the further reason that the proposed finding of fact is not supported by competent, substantial, credible testimony and evidence presented. Rejected in part as constituting a conclusion of law and accepted to the extent that reasonable assurances concerning the effect of the water table elevation discussed in the Recommended Order have not been provided and such assurance should be a condition on a grant of the permit. The remainder of that proposed finding of fact is not supported by the competent, substantial, credible evidence presented and is irrelevant. Rejected as constituting a conclusion of law. Rejected as constituting a conclusion of law. Rejected as constituting a conclusion of law. Rejected as constituting a conclusion of law. Accepted. Accepted. Accepted. Rejected as not comporting with the competent, substantial, credible testimony and evidence presented.

Florida Laws (3) 120.57403.087403.182
# 4
THOMAS V. INFANTINO, FRANCES INFANTINO, ET AL. vs. ISLAND VILLAGE CONDOMINIUMS AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 81-002407 (1981)
Division of Administrative Hearings, Florida Number: 81-002407 Latest Update: Apr. 08, 1982

Findings Of Fact The applicant, Island Village Condominiums, prepared and submitted to the Department of Environmental Regulation a completed application for construction of its extended aeration sewage treatment plant. The relative distance and direction from the proposed treatment plant to major bodies of surrounding surface water are depicted in an aerial photograph which accompanied the application. The elevation of the surrounding waters in all directions is 39 feet. When the treatment plant is operated in compliance with its design features, the effluent from the plant will exceed the Department's standards for effluent discharge. The zone of discharge will be confined to the owners' property. Surface waters will not be involved in discharge. There will be no adverse impact upon ground waters. The treatment plant would not create a hazzard to the deep water wells of Point O' Woods Utilities, Inc. The treatment plant, as designed, meets or exceeds the engineering standards established by the Department. The likelihood of geologic subsurface failure is remote. Ground water levels are included on the schematic plan which accompanied the application to the Department. The tops of the holding ponds are above the 100-year flood level. The treatment plant will produce no noticeable odor. No exterior lights are to be used with the plant. The noise from the plant's operation would not travel more than 200 feet. The holding ponds would be more than 120 feet from the nearest surface water. The estimate of the cost is accurate at $98,000. Martin I. Gunn, Inc., is the developer of the property, which is also owned by the corporation, Island Village Condominiums, also known as Island Village of Inverness. The treatment plant will become the property of the home owners association and will be operated by the association from maintenance fees paid by the home owners. Martin I. Gunn/Island Village is not a public utility.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, the Hearing Officer recommends that the permit for the construction and operation of an extended aeration sewage treatment plant be issued to Island Village Condominiums subject to the general and specific conditions stated in the Department's original notice. DONE and ORDERED this 19th day of February, 1982, in Tallahassee, Leon County, Florida. STEPHEN F. DEAN, Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 19th day of February, 1982. COPIES FURNISHED: Thomas V. Infantino, Esquire Post Office Drawer. B Winter Park, Florida 32790 Donald F. Perrin, Esquire New Bank of Inverness Building Highway 41, South Post Office Box 1533 Inverness, Florida 32650 William W. Deane, Esquire Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32301 Victoria J. Tschinkel, Secretary Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32301

Florida Laws (5) 120.57367.021367.022403.086403.0876
# 5
JEROME MASSEL AND BERNICE MASSEL vs DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES, 90-006487 (1990)
Division of Administrative Hearings, Florida Filed:Daytona Beach, Florida Oct. 12, 1990 Number: 90-006487 Latest Update: Apr. 02, 1991

Findings Of Fact Petitioners purchased property in New Smyrna Beach, Florida to build a home. The property, which was platted in the 1940's measures 50 feet by 200 feet. The east side of the property (50') is located on Engram Road. The northern 200 feet and western 50 feet of the property is waterfront, situated on a tidal inlet from the Indian River. The Indian River contains the last remaining Class II waters in Volusia County. Class II waters in Florida are waters in which the state allows shellfish harvesting for public consumption. As the last remaining Class II waters in the county, the area requires special protection from all possible sources of pollution and negative environmental impact, including sewage outflow. According to the Petitioner, the seller of the property indicated to Petitioners that the property had been approved for constructing a home. The seller substantiated his assertion with a letter from the Volusia County Planning and Zoning Department stating that a county variance had been granted to construct a single family dwelling on this property, subject to certain conditions. The county approval letter specified the required use of an aerobic wastewater treatment system. The Petitioners were unaware of the state regulations and standards for onsite sewage disposal systems. The Petitioners hired a builder who applied to the HRS Volusia County Public Health Department for a septic tank permit. The permit was denied because the proposed septic tank system violated 50 foot set back required of sewage treatment systems from Class II waters. The proposed drainfield was located within 28 feet of the mean high water line, and because of the configuration of the lot and its depth of only 50 feet the proposed site cannot meet the state standard. The Petitioners' builder subsequently applied to the state Department of Health and Rehabilitative Services for a variance from the code standards in order to obtain the septic tank construction permit. The state denied the variance stating that the "request was not considered to be a minor deviation from the minimum requirements". The Petitioners received no notification of the time and place of the Variance Review Board's meeting because the variance application was submitted by their builder. Petitioners had no opportunity to personally address the Variance Board when their application was being considered. A sewer line is located within 1000 feet of the property and a sewage grinding and pumping system could be installed to pump sewage from the site to the sewer line. Such a system, costs approximately the same amount as an onsite system. A grinding and pumping system is an economically reasonable alternative to permit development of the lot.

Recommendation Having considered the foregoing Findings of Fact, Conclusions of Law, the evidence of record, the candor and demeanor of the witness, the arguments of the parties, it is therefore RECOMMENDED: That the request for a variance be DENIED. DONE and ENTERED this 2nd day of April, 1991, in Tallahassee, Florida. STEPHEN F. DEAN Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 2nd day of April, 1991. COPIES FURNISHED: Sam Power, Agency Clerk Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, FL 32399-0700 Linda Harris, General Counsel Department of Health and Rehabilitative Services 132 Winewood Boulevard Tallahassee, FL 32399-0700 Jerome and Bernice Massel 6426 Engram Road New Smyrna Beach, FL 32169 Charlene J. Petersen, Esquire HRS-District 4 P.O. Box 2417 Jacksonville, FL 32231-0083

Florida Laws (1) 120.57
# 6
ENGLEWOOD WATER DISTRICT vs. RALPH A. HARDIN, D/B/A POLYNESIAN VILLAGE, 84-000810 (1984)
Division of Administrative Hearings, Florida Number: 84-000810 Latest Update: Apr. 09, 1984

Findings Of Fact Respondent owns and operates a waste water treatment facility at Polynesian Village Mobile Home Park, owns the land at this village, leases these lots to mobile home owners, and provides them with waste water treatment. He was last issued an operating permit on January 18, 1983, by Petitioner. Respondent posted an Operational Bond (Exhibit 2) in the amount of $7,500 with Northwestern National Insurance Company as surety to faithfully operate the treatment facility and comply with all Rules and Regulations of the Petitioner. Englewood Water District, petitioner, was established by special act of the Florida Legislature in Chapter 59-931, Florida Statutes, and is given authority in Section 4 thereof to regulate use of sewers, fix rates, enjoin or otherwise prevent violations of the act or any regulation adopted by Petitioner pursuant to the act, and to promulgate regulations to carry out the provisions of the act. Pursuant to this authority, Petitioner promulgated Waste Water Treatment Facilities Design, Construction and Operation Regulations dated June 19, 1980, and revised April 28, 1983. During an inspection of Respondent's waste water treatment facility on October 17, 1983, leaching was observed at both the north and south drain fields with effluent from the system rising to the surface. Samples of this effluent when tested showed a fecal coliform count of 2800/100 ml. The basic level of disinfectant shall result in not more than 200 fecal coliform values per 100 ml of effluent sample (Rule 17-6.060(1)(b)3a, F.A.C.). Following this test, Notice of Violation (Exhibit 4) was served on Respondent. No action was taken by Respondent to correct this condition and on January 6, 1984, a Citation (Exhibit 5) was issued to Respondent scheduling a hearing for January 26, 1984. Following the issuance of that Citation frequent inspections of the facility were conducted by employees of Respondent to ascertain if steps were being taken by Respondent to correct the deficiencies. Additionally, inspections were made by inspectors from Sarasota County Pollution Control. Inspections were conducted January 9, 16, 17, 18, 20, 23, and 31; February 1, 8, 13, 14, 16, 21, 24, 25, 26, 27, 28, and 29; and March 2, 5, 8, and 9, 1984. These inspections revealed what appears to be a "blow-out" in the south drain field where effluent bubbles to the surface and flows onto the adjacent streets and propert (Exhibits 9 and 11). Effluent tested from this source had fecal coliform counts as high as 9440/100 ml. During one of these inspections effluent from the treatment plant was being discharged directly onto the road to a drainage ditch adjacent to the plant (Exhibit 8). The coliform count of a sample taken from this ditch was 13500/100 ml. Respondent was issued a second Citation on March 2, 1984, and this hearing was held on the violations alleged in that Citation, to wit: creating a public nuisance and leaching from drain field. Respondent contends that he is dealing with the Sarasota County Engineer to correct the problems and, after failing in his attempt to get the county to provide drainage from his property, he is now in the process of installing drain pipes. Respondent contends that the natural drainage of surface waters from his land to adjacent land was stopped by development on the adjacent land and the heavy rains this winter has saturated his land and inhibited percolation in the drain fields. Accordingly, the effluent from his plant could not be absorbed by the drain field. Respondent also contends that the drain field worked fine for several years before the drainage problem arose and believes it will again work well when the drainage situation is corrected.

# 7
JOHN W. HOLIAN AND BETTY HOLIAN vs DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES, 90-003109 (1990)
Division of Administrative Hearings, Florida Filed:Cross City, Florida May 17, 1990 Number: 90-003109 Latest Update: Dec. 19, 1990

The Issue The issues for consideration in these cases concern whether the Petitioners are entitled to an on-site sewage disposal system ("OSDS") permit, or the grant of a variance from the permitting requirements embodied in the statutes and rules cited herein, so as to authorize installation of an OSDS for property they own near the Suwanee River in Dixie County, Florida. See, Section 381.272, Florida Statutes, and Chapter 10D-6, Florida Administrative Code.

Findings Of Fact The Petitioners are the owners of certain real property located in Dixie County, Florida, in close proximity to the Suwanee River, more particularly described as Lots 22 and 37, High Point Suwanee Riverfront Estates, a subdivision platted and recorded in 1983. Lot 22 is approximately 150 feet by 127 feet by 121 feet, and Lot 37 is approximately 100 feet by 175 feet by 176 feet in dimension. The lots were purchased on September 22, 1987 and December 10, 1987, respectively. The parties have stipulated that evidence and factual testimony adduced in this proceeding shall apply equally to the circumstance of both lots since they are in close proximity to each other and have similar elevations and other site characteristics. Accordingly, these Findings of Fact will be based upon that stipulated, combined evidence; and all Findings of Fact will apply to both lots, except as to elevation figures peculiar to each lot and as otherwise noted in these Findings of Fact. The Petitioners purchased Lot 22 for $14,995.00 and Lot 37 for $12,500.00. They were purchased in September and December of 1987, respectively. The Petitioners purchased them with the intent of holding them for investment and building a retirement-type home on one of the lots. On March 22, 1990, the Petitioners applied for an OSDS permit for the lots in question. The new systems applied for would be for a frame-type "stilt home", which would contain three bedrooms and a heated and cooled area of 1,232 feet, which equates to a 350-450 gallons per day sewage flow under the standards contained in the Respondent's rules. Hubert H. Raker, a certified, land surveyor of Cross City, Florida, performed a survey on the property, shown by Petitioners' Exhibit NO. 1 in evidence. That survey establishes a benchmark elevation for Lot 22 of 11.79 feet above mean sea level ("MSL"). That benchmark is actually six inches above the grade level elevation of the property at the benchmark location. Lot 37 was established to have a benchmark elevation of 12.25 feet above MSL, also six inches above the actual grade level of the lot at the benchmark elevation site. The site of the proposed installation of the OSDS has an elevation of 11.19 feet above MSL, as to Lot 22, and 11.75 feet above MSL, as to Lot 37. The ground water level, at the time the site evaluation was made by the Respondent's representative, was 60 inches below the surface of the grade for Lot 22 and 54 inches below the surface of the grade for Lot 37. The wet season water table for both lots was shown, by "mottling" existing in the soil beneath the surface of the lots, to be 54 inches below `:he surface of both lots. The soil type for both lots, starting with six inches below the surface, is of a "slight limited" soil characteristic and is fine sand down to approximately 48 inches and from 48 inches to 72 inches, consists of "loamy-sand". Such soils are well adapted to OSDS installation and operation. The property was shown, by the Respondent's own Composite Exhibit NO. 2 in evidence, to not be subject to frequent flooding. The property is, however, as to both lots, beneath the ten-year flood elevation established by the Suwanee River Water Management District's calculations and admitted into evidence in this proceeding as a part of Respondent's Composite Exhibit NO. 2. The ten-year flood elevation for both lots was shown to be 15 feet above MSL. Thus the surface elevation of both lots is somewhat below the 15-foot, ten-year flood elevation. The bottom of the drain-field or absorption-bed trenches, if the systems were installed on the lots, would be a greater distance beneath the ten- year flood elevation. Thus, the property is located within the ten-year flood elevation of the Suwanee River and is also located within the regulatory floodway of the Suwanee River. Other properties and lots in the immediate proximity of the Petitioners' two lots are equipped with OSDS's, including a number of "mounded systems", involving the placement of septic tanks and drain fields in elevated earthen mounds in order to elevate them above the ten-year flood elevation. Petitioner, John W. Holian, testified in a general way that such a system might be feasible and advisable in his situation, as well as the possibility of installing an aerobic septic tank treatment and disposal system, involving the injection of air into the septic tanks so that aerobic, (as opposed to anaerobic), bacteria could perform the sewage treatment function, which typically perform the function better than does a conventional anaerobic system. Petitioner Holian, did not offer any detailed testimony or evidence which would explain and establish how such a system could work without endangering the health of the Petitioners or members of the general public, if placed on the lots in question below the ten-year flood elevation, nor if or how such a system would protect against degradation of the ground or surface waters involved in the proximity" of the sites. If the system were mounded above the ten-year flood elevation, the Petitioners did not establish, through proper engineering testimony and other evidence generated by a registered engineer, that the use of the fill for the earthen mound for such a system would not raise the level of the "base flood." In summary, although the Petitioners suggested such a mounded system or an aerobic system or such a system possibly used in combination, the Petitioners did not go beyond suggesting an alternative and did not offer evidence which could establish that such an alternative would be a reasonable operationally feasible one and would adequately protect the ground or surface waters and the members of the general public from health hazards associated with sewage effluent. See, Rule 10D-6.47(6), Florida Administrative Code. On May 1, 1990, the Respondent, by letter, advised the Petitioners that they should pursue a formal administrative proceeding upon the initial denial of their OSDS permit application and advised them that an application for a variance from the requirements of Rule 10D-6.47(6), Florida Administrative Code, regarding the ten-year flood elevation problem at issue, should not be pursued but rather, the formal hearing process before the Division of Administrative Hearings should be employed by the Petitioners. The Respondent asserts, that the Petitioners were not accorded the opportunity to avail themselves of the variance procedure because of the Respondent's interpretation of the Governor's Executive Order 90-14, which it opines precludes it from granting any variances or permits for OSDS within the ten-year flood elevation. The Governor's Executive Order, which incorporated the "Suwanee River Task Force" recommendation to preclude such systems beneath the ten year flood elevation was entered on January 17, 1990. The Respondent has, in effect, interpreted that Executive Order as precluding it from exercising its discretion to entertain and grant or deny variance applications. The Petitioners apparently took-that advice because no variance application was filed. It is noted, somewhat parenthetically, however, that in terms of the requirements for the establishment of a right to a variance, the Petitioners have not shown that no reasonable alternatives exist to a standard subterranean septic tank and drain field OSDS, (such as those alternatives referenced in the paragraph next above, which efficacy was, nonetheless, not established by the Petitioners). Neither did the Petitioners establish, in terms of the variance requirements in the authority referenced below, that the installation of an OSDS would not have an adverse effect on the public's health or the quality of the ground or surface waters involved at the sites. Because these two necessary elements of proof necessary to establish the right to a variance, through hardship, were not proven by the Petitioners, the elements of proof necessary to establish the right to a hardship variance have not been made out by the Petitioners and one could not be granted under the proof of record in this proceeding, even had the Petitioners made formal application for such a variance. That is not to say, however, that with proper preparation and presentation of evidence, entitlement to a variance could not be established in the future.

Recommendation Having considered the foregoing Findings of Fact, Conclusions of Law, the evidence of record, the candor and demeanor of the witnesses, and the pleadings and arguments of the parties, it is therefore, RECOMMENDED that a Final Order be entered denying the Petitioner's application for an OSDS permit. DONE AND ENTERED this 19th day of December, 1990, in Tallahassee, Leon County, Florida. P. MICHAEL RUFF Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 20th day of December, 1990. APPENDIX TO RECOMMENDED ORDER IN CASE NO. 90-3109 AND 90-3445 The Petitioners filed no proposed findings of fact. Respondent's Proposed Findings of Fact 1-9. Accepted. COPIES FURNISHED: Sam Power, Agency Clerk Department of HRS 1323 Winewood Boulevard Tallahassee, Florida 32399-0700 Linda K. Harris, Esquire General Counsel Department of HRS 1323 Winewood Boulevard Tallahassee, Florida 32399-0700 John W. Holian 466 South Lake Triplet Drive Casselberry, Florida Frances S. Childers, Esquire Assistant District III Legal Counsel Department of HRS 1000 N.E. 16th Avenue Gainesville, Florida 32609

Florida Laws (1) 120.57
# 8
CITY OF PEMBROKE PINES AND GREEN MEADOWS CIVIC ASSOCIATION vs. SOUTH BROWARD UTILITY, INC., AND PUBLIC SERVICE COMMISSION, 89-002826 (1989)
Division of Administrative Hearings, Florida Number: 89-002826 Latest Update: Aug. 22, 1989

The Issue Whether the objections of the City of Pembroke Pines and the Green Meadows Civic Association to South Broward Utility, Inc.'s, proposal to extend its water and sewer service area should be sustained.

Findings Of Fact South Broward Utility, Inc. (South Broward), is a corporation engaged in the business of providing water and wastewater service to the public in Broward County, Florida. That business is subject to regulation by the Florida Public Service Commission (PSC). South Broward's water and wastewater treatment facilities are located in the Town of Davie, and it currently provides water and sewer services to residents of that municipality. Included within the area of the Town of Davie currently served by South Broward are the lands bordered on the north by Sterling Road, the south by Sheridan Street, and the west by Dykes Road (S.W. 160th Avenue). On February 4, 11, and 18, 1989, South Broward published a notice of extension in the Florida Lauderdale News/Sun-Sentinel, a daily newspaper of general circulation published in Broward County, Florida, in accordance with Rule 25-30.030(2), Florida Administrative Code. The notice provided that South Broward would file an application with the PSC pursuant to Section 367.061, Florida Statutes, to amend its certificates of public convenience and necessity to allow South Broward to provide water and sewer service to the east half of Section 5, Township 51 South, Range 40 East, Broward County, Florida. Such area may commonly be described as those lands lying immediately west of Dykes Road to S.W. 166th Avenue, and from Stirling Road on the north to Sheridan Street on the south. On February 24, 1989, South Broward mailed a copy of the aforementioned notice to all local, county and state governmental agencies and all other persons required by Section 367.041(4), Florida Statutes, and Rule 25-30.030(2), Florida Administrative Code. Objections to the notice were filed with the PSC by the City of Pembroke Pines (Pembroke Pines) and the Green Meadows Civic Association (Green Meadows). In its objection, Pembroke Pines contended that it had invested over 30 million dollars to expand its municipal water and sewer service west to the Conversation Area from Sheridan Street on the north to Pembroke Road on the south, that this expansion project was anticipated to provide water and sewer service for its existing municipal boundaries as well as the area proposed to be served by South Broward, that it was preparing an annexation report for the proposed area, and that if South Broward's application were approved it would be precluded from servicing its own residents should annexation occur. At hearing, the proof demonstrated that Pembroke Pines had expanded its municipal water and sewer service such that its water and wastewater treatment plants and related facilities have adequate present capacity to meet the current and anticipated future water and wastewater needs in the disputed service area. The Pembroke Pines water lines are currently located on the south side of Sheridan Street, which street forms the southerly boundary of the disputed service area. Its wastewater treatment lines are, however, located approximately one and one-half miles south of Sheridan Street and would require several months and considerable expense to extend them to the disputed service area. Notably, however, no proof was offered that Pembroke Pines had any current intention to annex the disputed service area, or that it had otherwise evidenced any intent to, or taken any action to, provide service to the area. Green Meadows is an association of residents of this area of unincorporated Broward County, some of whom reside within the service area in dispute. The gravamen of Green Meadows' objection is its concern that sewer lines for a centralized sewer system would leak into its member's ground water supply, and that the increase in population density caused by a centralized water and sewer system would adversely affect the area's ecosystem. Neither Green Meadows nor Pembroke Pines contended, however, that the subject extension of service would violate any land use plan, zoning ordinance or other state or local law, and no credible proof was offered that, if built consistent with existent law, the sewer lines would adversely impact the ground water supply or ecosystem. Until recently, all of the lands lying in the disputed service area were located in unincorporated Broward County. However, in September 1988 a parcel of approximately 15 acres which abutted Dykes Road was annexed into the Town of Davie, and in May 1989 a parcel of approximately 80 acres, which abutted the previously annexed parcel on the east, Sterling Road on the north, and S.W. 166th Avenue on the west, was annexed into the Town of Davie. These lands comprise approximately 30 percent of the lands within the disputed service area, and it is the desire of the Town of Davie that water and sewer service to such lands be provided by South Broward. To date, South Broward has entered into a developer's agreement with the owner of the 80-acre parcel to provide such services, and is in the process of executing such an agreement with the owner of the 15-acre parcel. Pembroke Pines does not object to South Broward's expansion into these areas. As to the remaining acreage within the proposed service area, the owners of the vast majority of those lands have expressed a preference for South Broward to provide water and sewer service to their properties, and South Broward has expressed its desire and ability to provide such services. South Broward's water plant has an existing capacity of 500,000 gallons per day (GPD), and has sufficient capacity to address the current need for water service in the proposed area. Upon completion of its current expansion, which is anticipated in October 1989, South Broward's water plant will have a capacity of 1,250,000 GPD, and adequate capacity to address any future demand for water service in the proposed area. South Broward's wastewater treatment plant, with a capacity of 500,000 GPD, currently has sufficient capacity to satisfy the present and future demand for such services in the proposed area. An expansion of that plant is expected to be in service by 1991, which will double the plant's capacity and provide additional capacity. Currently, South Broward has water and sewer lines adequate to serve the proposed area in place, and located under Dykes Road at the eastern edge of the service area. Such lines are adequate to meet all present and anticipated future needs for such service in the area, and the water lines are adequate to provide fire protection to the area. South Broward has the present financial, managerial, operational, and technical ability to provide the present and anticipated needs for water and wastewater service in the proposed area, and the public interest will be best served by the extension of South Broward's water and wastewater systems to that area. Such expansion will not be in competition with or a duplication of any other system in the area.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that the objections filed by Pembroke Pines and Green Meadows be denied. DONE AND ENTERED in Tallahassee, Leon County, Florida, this 21st day of August 1989. WILLIAM J. KENDRICK Hearing Officer Division of Administrative Hearings The Oakland Building 2900 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 21st day of August, 1988. APPENDIX The proposed findings of fact filed by South Broward are addressed as follows: Addressed in paragraph 1. Addressed in paragraph 3. Addressed in paragraph 4. Addressed in paragraph 5. 5-10. Addressed in paragraph 9. 11-14. Addressed in paragraphs 10-13. 15 & 16. Addressed in paragraphs 6 and 7. Addressed in paragraph 13. To the extent pertinent, addressed in paragraph 8. Addressed in paragraph 8. 20 & 21. Addressed in paragraph 13. The proposed findings of fact filed by the PSC are addressed as follows: 1 & 2. Addressed in paragraph 3. Addressed in paragraph 9. Addressed in paragraph 3, and paragraphs 2 and 3 of the conclusions of law. Addressed in paragraph 8. 6-12. Addressed in paragraphs 9-13. Addressed in paragraph 7. Addressed in paragraph 9. Addressed in paragraph 8. Addressed in paragraph 12. COPIES FURNISHED: Mitchell S. Kraft, Esquire Josias & Goren, P.A. 3099 East Commercial Boulevard Suite 200 Fort Lauderdale, Florida 32308 Deborah Simone, President Green Meadows Civic Association 5831 S.W. 162nd Avenue Fort Lauderdale, Florida 33331 James L. Ade, Esquire Martin, Ade, Birchfiled & Mickler, P.A. 3000 Independent Square Post Office Box 59 Jacksonville, Florida 32201 Randy Frier, Esquire Public Service Commission Fletcher Building 101 East Gaines Street Tallahassee, Florida 32399-0870 Mr. Steve Tribble, Director Records and Reporting Public Service Commission Fletcher Building 101 East Gaines Street Tallahassee, Florida 32399-0870 David Swafford, Executive Director Public Service Commission Room 116 101 East Gaines Street Tallahassee, Florida 32399-0870 Susan Clark General Counsel Public Service Commission Room 116 101 East Gaines Street Tallahassee, Florida 32399-0870

Florida Laws (1) 120.57 Florida Administrative Code (1) 25-30.030
# 9
JACK ROTH vs. PASCO COUNTY UTILITIES DEPARTMENT AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 88-003042 (1988)
Division of Administrative Hearings, Florida Number: 88-003042 Latest Update: Oct. 31, 1989

Findings Of Fact Respondent Pasco County Utilities (County) seeks the issuance of Permit Number DC 51-143059 for construction of a 400,000 gallon per day wastewater treatment plant and spray irrigation disposal system. The County presently has an interim 100,000 gallon per day (gpd) capacity domestic wastewater treatment facility, including a 10 acre spray irrigation field, which is on the 80 acre site proposed for the expanded facility. The site is located in the northcentral portion of Pasco County near McKendree and Tucker Roads. The facility is known as the Pasco Central Subregional Wastewater Treatment Plant (Pasco Center). The site on which the facility is located was purchased by the County in 1987 as part of a plan dividing the geographical area of the county into 17 subregional service areas. It is contemplated that each of these areas will eventually be served by a wastewater treatment plant with a capacity of up to nine million gpd. Development representatives, seeking to have new developments served by county treatment plants such as Pasco Center, are required by the County to agree to accept treated reclaimed water for disposal via irrigation on golf courses, road medians, common green areas and similar areas within the developments. Such agreements with developments require that a gallon of reclaimed water be accepted for each gallon transferred to the plant for treatment. Further, the County is actively seeking additional spray irrigation disposal areas for the Pasco Center. A recent contract with an owner of an adjacent 40 acre orange grove will soon make that site available for reclaimed water irrigation. The Pasco Center plant site is located in a rural area. As a result of site design and selection, adverse effects on neighboring properties are minimized. The present plant facility, which will also serve the expanded facility, is located more than three thousand feet from Petitioner's residence, separated by Tucker Road and a 100 foot buffer of pine trees surrounding the perimeter of the entire site. The pine trees have been planted around the facility to provide a visual buffer and to minimize any aerosol drift that may occur on a windy day. Since the aeration process utilized by the facility minimizes any aerosol drift, any resultant aerosol odor after expansion of the facility will likely be minimal to nonexistent. The property is fenced, but accessible to authorized personnel. While the County is exempt from zoning regulations by Section 25.82 of the County Zoning Ordinance, the property upon which Pasco Center is located is zoned for agricultural use and allows public and quasi-public buildings and structures of either county, state or federal governments. The proposed treatment plant is intended to substitute for the present 100,000 gpd plant at Pasco Center. The proposed plant will have a 400,000 gpd advanced secondary wastewater treatment capacity using the extended aeration method. The plant itself will be contained within an 80 foot diameter concrete tank divided into separate aeration, settling, digestion and chlorine contact chambers. Following treatment and filtration, treated reclaimed water will be routed to a clay-lined, 1.2 million gallon capacity holding pond. From the holding pond, spray irrigation will occur. The proposed plant is designed to meet or exceed plant construction standards set forth in Rule Chapter 17-6, Florida Administrative Code. Reasonable assurance has been provided by the County that the proposed plant will not cause pollution in violation of applicable rules of Respondent Department of Environmental Regulation (Department). In order to accommodate the plant's proposed increased plant capacity of 400,000 gpd, the County proposes expansion of the existing 10 acre spray irrigation field. The enlarged field will include two zones where irrigation will occur on alternate days. Irrigation will automatically commence when the treated wastewater fills the holding pond to a preset level. Two agricultural-type sprinkler systems will be activated at these times for irrigation purposes. The entire system will include 40 individual spray heads. The holding pond capacity of 1.2 million gallons will retain three days of treated effluent produced by the plant to meet any contingency that rain or other site conditions may make irrigation temporarily impossible. The proposed spray irrigation area is not located within the 100 year flood plain. A small portion of the property which is within the flood plain will not be used for spray irrigation. The irrigation area is located on a sand ridge and contains good permeable soils which increase the disposal capacity of the site. Depth to groundwater averages between 6 to 18 inches to the surficial aquifer and 30 feet to the Floridan aquifer. An adequate buffer zone has been established between the spray irrigation area and a sinkhole located on the property. Further protections include a surficial monitoring well and Floridan aquifer monitoring well between the sinkhole and the spray site. The irrigation area is very large in comparison to the quantity of effluent proposed for disposal. The proposed 400,000 gpd application rate proposed by the County is a conservative one, and the site, in all likelihood, will be able to utilize more than that amount. Spray irrigation at the proposed rate will not cause surficial runoff or affect the Floridan aquifer. There is no likelihood that the Cypress Creek Wellfield, located 2.5 miles from the Pasco Center location, will be affected by the spray irrigation at the facility. Travel time for groundwater to reach the CypressCreek field drawdown area in the eventuality of a spill of effluent from the treatment plant is estimated at 2800 years. Six shallow wells have been installed at the site by the County for monitoring the surficial aquifer and two deep wells for monitoring the Floridan aquifer. As previously noted, one of each type of well is located between the spray site and the sinkhole. All wells are located both up gradient and down gradient of the property to measure both background levels and to sample the quality of groundwater leaving the site. The ground water monitoring plan is adequate for the protection of surface waters and the Floridan aquifer. The Pasco Center site is an appropriate location for the spray irrigation of 400,000 gpd of reclaimed water. The proposed spray field complies with the requirements of the Department's land application manual. The County has provided the Department with reasonable assurances that the disposal of 400,000 gpd on the site by means of spray irrigation will not cause pollution in violation of rules of the Department.

Recommendation Based on the foregoing, it is hereby RECOMMENDED that a Final Order be entered dismissing the petition and issuing permit number DC 51-143054 to the County. DONE AND ENTERED this 31st day of October, 1989, in Tallahassee, Leon County, Florida. DON W. DAVIS Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Fl 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 31st day of October, 1989. APPENDIX The following constitutes my specific rulings, in accordance with Section 120.59, Florida Statutes, on findings of fact submitted by the parties. Petitioner's Proposed Findings. None Submitted. Respondent County's Proposed Findings: 1.-7. Adopted in substance. 8. Adopted by reference. 9.-23. Adopted in substance. 24.-26. Adopted by reference. 27.-29. Unnecessary to result reached. 30. Rejected as a legal conclusion. Textual analysis of 403.412, F.S. indicates applicability of this statutory section as a basis for the award of attorney fees and costs in this proceeding is inappropriate. Respondent Department's Proposed Findings: 1.-13. Adopted in substance. COPIES FURNISHED: Lisa C. Bennett, Esq. Pasco County Attorney's Office 7530 Little Road, Room 203 New Port Richey, FL 34654 Richard Donelan, Jr., Esq. Assistant General Counsel Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, FL 32399-2400 Jack Roth P.O. Box 845 San Antonio, FL 33576 Dale H. Twachtmann, Secretary Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, FL 32399-2400 Daniel H. Thompson, Esq. General Counsel Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, FL 32399-2400

Florida Laws (2) 120.57403.412
# 10

Can't find what you're looking for?

Post a free question on our public forum.
Ask a Question
Search for lawyers by practice areas.
Find a Lawyer