Elawyers Elawyers
Washington| Change
Find Similar Cases by Filters
You can browse Case Laws by Courts, or by your need.
Find 49 similar cases
GERALD M. WARD vs PALM BEACH COUNTY AND DEPARTMENT OF COMMUNITY AFFAIRS, 07-001502GM (2007)
Division of Administrative Hearings, Florida Filed:West Palm Beach, Florida Apr. 02, 2007 Number: 07-001502GM Latest Update: Dec. 25, 2024
# 1
JOHN S. DONOVAN, DAVID H. SHERRY, AND REBECCA R. SHERRY vs CITY OF DESTIN, FLORIDA, AND DEPARTMENT OF ENVIRONMENTAL PROTECTION, 19-001844 (2019)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Apr. 09, 2019 Number: 19-001844 Latest Update: Nov. 20, 2019

The Issue The issues to be determined is whether the City of Destin (“City”) has demonstrated its entitlement to place dredged material from the maintenance dredging of the East Pass (“East Pass” or “inlet”) entrance channel conducted pursuant to the Consolidated Joint Coastal Permit and Sovereign Submerged Lands Authorization, Permit Number: 0288799-003-JC (“Permit”), in the swash zone east of East Pass in accordance with the Notice to Proceed (“NTP”); and whether the Inlet Management Plan referenced in the NTP is an unadopted rule as described in section 120.57(1)(e), Florida Statutes.

Findings Of Fact Based upon the demeanor and credibility of the witnesses, the stipulations of the parties, and the evidentiary record of this proceeding, the following Findings of Fact are made: The Parties Petitioners, David H. Sherry and Rebecca R. Sherry, own Unit 511 at the Surf Dweller Condominium, 554 Coral Court, Fort Walton Beach, Florida. The Surf Dweller Condominium, which is on Santa Rosa Island in the unincorporated community of Okaloosa Island,1/ fronts the Gulf of Mexico, and straddles DEP Reference Monument R-7, which is between three and four miles west of DEP Virtual Monument V-611, and is between five and six miles west of the west side of East Pass. The Sherrys use the beach at their condominium on a daily basis for fishing, crabbing, swimming, walking, running, and general recreation. They also walk or run from Monument R-7 along the beaches to East Pass, and occasionally drive to and use the beaches on the east side of East Pass. Petitioner, John S. Donovan, owns Units 131 and 132 at the El Matador Condominium, 909 Santa Rosa Boulevard, Fort Walton Beach, Florida. The El Matador Condominium is on Okaloosa Island, fronts the Gulf of Mexico, and is approximately five miles west of Monument V-611, and is more than six miles west of the west side of East Pass. Mr. Donovan generally walks the beaches west of his condominium, but does occasionally walk along the beach to Monument V-607, which is the location of a seawall constructed by the Air Force on sovereign submerged lands to protect an Air Force tracking facility. Intervenor, Thomas Wilson, resides at 856 Edgewood Drive, Charleston, West Virginia, and owns a secondary residence at 1530 Miracle Strip Parkway, No. 101-B, Fort Walton Beach, Florida, in the vicinity of Monument R-14. Mr. Wilson uses and enjoys the gulf-front beaches between his property on Okaloosa Island and East Pass. Petitioners’ stated injuries are related to the allegation that the lateral movement of sand from the East Pass areas of influence is from east to west. Placing dredged material in the eastern disposal site would allegedly deprive the beaches in front of their property -- beaches that are miles from the nearest area of influence or spoil disposal site -- of their natural sand supply by cutting off what they allege to be the natural sand flow, causing the beaches in front of their properties to eventually erode. Petitioners alleged no immediate environmental injuries associated with the NTP. Petitioners’ stated objective in this case is to have any sand dredged from East Past to be placed on the western disposal areas at all times. The City is the applicant for the Permit and the NTP, and abuts the east side of East Pass. DEP is an agency of the State of Florida pursuant to section 20.255, Florida Statutes. DEP is the permitting authority in this proceeding and issued the NTP at issue in this proceeding to the City. The NTP was issued on February 2, 2018, without notice of rights language regarding the right to request a hearing or time limits for doing so. Petitioners received a copy of the NTP on October 1, 2018, and filed a challenge more than 14 days later, on November 30, 2018. East Pass Prior to 1928, the connection from Choctawhatchee Bay to the Gulf of Mexico flowed through what is now Old Pass Lagoon. After a storm in 1928, a high-tide breach of the shoreline near the current location of East Pass was formed. In 1929, a record rain event caused waters to rise in Choctawhatchee Bay. Residents of the area dug a relief channel at roughly the present location of East Pass. The waters releasing through the more hydraulically efficient flow path from Choctawhatchee Bay established a channel, which quickly enlarged to become the prominent inlet to the Gulf of Mexico. The permanent channel, now known as East Pass, is the only navigable passage from Choctawhatchee Bay and the Intercoastal Waterway to the Gulf of Mexico between Panama City, Florida, and Pensacola, Florida. East Pass separates the gulf-fronting beaches of the City to its east from the beaches owned by the United States as part of Eglin Air Force Base to the west. The entrance to East Pass is protected by two boulder-mount jetties: a 3,860 foot- long jetty on the west side of the inlet and a 1,210 foot-long jetty on the east side of the inlet. East Pass is an ebb tide dominated inlet, with a sizable amount of sediment moving in and out. When outgoing tidal flow moves though the constriction formed by the jetties, flow velocities are accelerated. When the water, and any entrained sediment, passes the jetties, flow tends to spread out to the east, west, and south, and naturally loses velocity. When the outgoing tidal waters reach a critical velocity where they can no longer carry the sand, the sand drops out of suspension, which forms the ebb shoal. Essentially, the ebb shoal is a large, semi-circular sandbar extending from the mouth of East Pass that was created by the ebb tide carrying sediments south. East Pass is a highly dynamic inlet system. There are processes spurred by the configuration and location of East Pass, tides, waves, and storms that have resulted in currents running to the east and west that change on a frequent basis. The Physical Monitoring Plan (“PMP”), which is part of the Permit, and thus, not subject to challenge in this case, established, for the period of 1996 through 2007, “a trend of west to east longshore transport, resulting in net gain immediately west of [East Pass] and a significant loss of sand along Holiday Isle east of [East Pass].” The PMP further established that a “drift nodal point” existed at East Pass. Longshore transport at uniform coastal locations is generally in one direction. However, when there are wave events coming from varying angles, and where beach contours are not parallel and uniform, or even linear, it is common for transport reversals to occur. The point at which those reversals occur is referred to as a nodal point. That point can be where east and west transport converges, or where it diverges. The shoreline in the vicinity of East Pass has exhibited “quite a few” nodal points over the past decade, resulting in frequent drift reversals and sand transport to the east and the west. The evidence as to the existence and effect of the East Pass drift nodal point, and its affect on the lateral transport of sand in the area, including the East Pass areas of influence, was substantiated by testimony and other evidence introduced at the final hearing. The testimony and evidence that there is no consistent direction of lateral sand transport in the vicinity of East Pass, and no predominant lateral current transporting sand in a westerly direction, is accepted. Evidence to the contrary was not persuasive. East Pass includes a federal navigation channel. The federal navigation channel requires routine maintenance to prevent it from shoaling. On an average, East Pass is dredged in two-year intervals. The last time that East Pass was dredged was in December of 2013. It has now shoaled with sand and become very hazardous for marine traffic. In December of 2018, the City declared a state of emergency relating to the navigational hazards caused by the accumulation of sand in the navigation channel. The Permit On February 26, 2015, DEP issued the Permit, which authorized the City to perform “periodic maintenance dredging of the federally authorized East Pass and Destin Harbor and navigation channels.” The Permit will expire on February 26, 2030. Notice of the issuance of this Permit was published in the Destin Log, a newspaper of general circulation, on December 24, 2014. No challenge to the issuance of the Permit was filed. As it pertains to the issues in this proceeding, the Permit provides that “Dredged material from . . . maintenance dredging activities will be placed in the swash zones of the beaches east and west of East Pass, as specified in the East Pass Inlet Management Plan.” The specific beach spoil placement sites are, as relevant to this proceeding, located “west of East Pass . . . between [DEP] reference monuments V-611 and V-622; and on 2 beach sites situated east of East Pass . . . from R-17 to R-20.5 and from R-23.5 to R-25.5.” Those areas correspond to what have been identified as the “areas of influence,” which are the beach areas east and west of East Pass that are affected by tidal forces generated by the inlet. The specified beach spoil placement sites, being conditions of the unchallenged Permit, are not subject to challenge in this case. The Permit establishes the criteria by which specific work is to be authorized. Specific Condition 5 provides, in pertinent part, that: 5. No work shall be conducted under this permit until the Permittee has received a written notice to proceed from the Department for each event. At least 30 days prior to the requested date of issuance of the notice to proceed, the Permittee shall submit a written request for a Notice to Proceed along with the following items for review and approval by the Department: * * * Prior to the second dredging event authorized under this permit, and each subsequent event, the Physical Monitoring Data, as specified in Specific Condition 9, shall be submitted to select the appropriate placement locations. Specific Condition 9 provides that: Following the initial placement of material on Norriego Point, fill site selection shall be supported by the latest physical monitoring data over a minimum of five years in accordance with the adopted East Pass Inlet Management Implementation Plan (July 24, 2013). All physical monitoring shall be conducted in accordance to the Approved physical monitoring plan dated August, 2014. A notice to proceed for specific projects shall be withheld pending concurrence by the Department that the data support the proposed placement location. The purpose of Specific Condition 9 is to identify, using supporting monitoring data from the eastern and western areas of influence, the “adjacent eroding beach” most in need of sand from the inlet. The requirement that physical monitoring data be used to determine which of the beach spoil placement sites identified in the Permit’s Project Description will receive the spoil from any particular periodic dredging event was to implement section 161.142, Florida Statutes. That section mandates that “maintenance dredgings of beach-quality sand are placed on the adjacent eroding beaches,” and establishes the overriding policy of the state regarding disposition of sand from navigational channel maintenance dredging. East Pass Inlet Management Implementation Plan The East Pass Inlet Management Implementation Plan (“East Pass IMP”) was adopted by Final Order of DEP on July 30, 2013.2/ The East Pass IMP was not adopted through the rulemaking procedures proscribed by chapter 120, Florida Statutes, or DEP rules. Despite a comprehensive Notice of Rights advising persons whose substantial interests could be affected of the means by which the East Pass IMP could be challenged, it was not. There are 44 maintained inlets in Florida. About half have individual inlet management plans. The East Pass IMP is not applicable to any inlet other than East Pass. The East Pass IMP does not require that any quantity of dredged material from the dredging of East Pass be placed at any particular location other than as established in the Permit. Rather, the disposal site is to be determined on a case-by-case basis based on the best monitoring data available for the beaches in the area of influence of East Pass. The critical element of the IMP, and that in keeping with the statutory requirement that sand be placed on “adjacent eroding beaches” is the “strategy” that “the recent erosion of adjacent beaches observed over a minimum of five years shall define the placement need in terms of location and volume.” The East Pass IMP, being applicable only to East Pass, is not of “general applicability.” Furthermore, the East Pass IMP does not implement, interpret, or prescribe law or policy. The Notice to Proceed On January 30, 2018, the City filed its Request for Notice to Proceed (“Request”). The Request addressed the criteria in Specific Conditions 5 and 9 of the Permit. Upon review, DEP determined the conditions of the Permit were satisfied and issued the NTP on February 2, 2018. The analysis of data submitted as part of the Request was designed to show areas of erosion and accretion within the eastern and western areas of influence in order to identify “critically eroded beaches.” The shoreline of Santa Rosa Island to the west of East Pass has historically been stable. To be sure, as is the case with any shoreline, there will be some areas of erosion and some areas of accretion. After Hurricanes Ivan and Opal, areas of Santa Rosa Island experienced erosion. DEP declared the shoreline to be critically eroded after the 2004-2005 hurricane seasons, which prompted Okaloosa County to commission a study to monitor the health of the Monuments R-1 through R-16 beach segment, a segment that includes Petitioners’ residences. Despite the fact that no post-storm beach restoration occurred in the area, the beach recovered naturally and gained sand following the post-storm recovery. In addition, Santa Rosa Island is known for “beach cusps,” which are crenulate3/ shapes along the shoreline. Depending on the season and storm conditions, those beach cusps can have a localized erosive effect on the beach, but those tend to be seasonal. They do not negate what the evidence shows to be the overall stable to accretional conditions of the beaches west of East Pass from Monument V-622 to Petitioners’ residences. Mr. Trammell offered testimony, including a discussion of photographic evidence, demonstrating the beaches west of East Pass have large dunes; multiple dune lines; tall, and thick vegetated dunes indicating established dune growth; pioneering vegetation indicating active, healthy dune growth and accretion; partially buried signs indicating dune advance; and broad and expansive beaches. Those features are indicative of a stable and accretional shoreline. Mr. Trammell’s testimony as to the western spoil disposal site was convincing and is accepted. At present, the Santa Rosa Island shoreline is not deemed by DEP to be “critically eroded.” The photographic evidence supports the data collected over time for the beaches west of East Pass, and the testimony offered at the final hearing, which collectively establishes, by a preponderance of the evidence, that the beaches to the west of East Pass are stable and accretional, are not subject to erosion caused by East Pass, and are not “adjacent eroding beaches” as that term is used in section 161.142. The shoreline east of East Pass, including the eastern area of influence and the proposed dredge material disposal sites at Monuments R-17 to R-20.5 and R-23.5 to R-25, except for the area immediately abutting the eastern jetty, is highly erosional. Mr. Trammell offered testimony, including a discussion of photographic evidence, demonstrating the beaches east of East Pass exhibit the following signs of significant and ongoing erosion: extensive dune erosion; exposed sea oat roots; reduced beach elevation; reduced beach width; crenulate bays; newly built dune walkovers that replaced old walkovers claimed by erosion; dune walkovers in close proximity to the shoreline indicating that the shoreline had receded to the walkover; and beach scarping at the shoreline indicating active erosion. Mr. Trammell’s testimony as to the eastern spoil disposal sites was convincing and is accepted. The eastern areas of influence are currently designated to be “critically eroded” by DEP, a designation maintained for more than 10 years. The photographic evidence supports the data collected over time for the beaches east of East Pass, and the testimony offered at the final hearing, which collectively establishes, by a preponderance of the evidence, that the beaches to the east of East Pass are critically eroded, a condition that is influenced by East Pass and or its navigational channel, and are “adjacent eroding beaches” as that term is used in section 161.142. Data in Support of the NTP The data submitted by the City to DEP in support of the Request included monitoring data for the eastern beach placement areas from the West Destin Four-Year Post-construction Monitoring Report and earlier annual post-construction reports covering the period from October 2012 to July 2017, and additional data from the Holiday Isle Emergency Beach Fill Two-Year Post-construction Report. DEP was also provided with historical monitoring data for the area west of East Pass, including the Western Beach Monitoring Report, which covered 2006 to 2017, and the Potential Borrow Area Impact Report, which included data from 1996 through 2012. DEP has also received recent profile data from April 2019. These reports, and the data contained within them, cumulatively provide more than 20 years of survey date, and demonstrate convincingly that the shoreline to the west of East Pass has been stable or accreting, and the areas to the east are eroded. The data submitted in support of the Request was sufficient to meet Specific Condition 9 that fill site selection be supported by the latest physical monitoring data over a minimum of five years in accordance with the East Pass IMP. Petitioners argue that the City failed to comply with the PMP, which requires, among other things, that the analysis of the dredged material disposal area include “preconstruction survey data and the most recent survey conducted at least five years prior.” The PMP establishes that “[p]reconstruction surveys shall be conducted no more than 90 days before construction commences. A prior beach monitoring survey of the beach and offshore may be submitted for the pre-construction survey if consistent with the other requirements” of the PMP. The City submitted a prior beach monitoring survey of the beach and offshore that is consistent with the PMP. Petitioners argue that the City violated a temporal limitation which provides that the City “may submit a prior beach restoration monitoring report for the west or east beach areas (Walton-Destin or Western Destin Beach Restoration Project) if the monitoring data is collected within 1 year of the proposed maintenance dredging event and if consistent with the other requirements of this condition.” Petitioners acknowledge in their PRO that the beach restoration monitoring report was timely when the Request for NTP was submitted. The information contained therein was sufficient to support the notice of proposed action on the NTP. The otherwise compliant data is no longer within one year of the proposed dredge. In that regard, the litigation in this case, initiated by Petitioners, has been ongoing for almost one year. Work authorized by the NTP cannot go forward when subject to challenge. If the PMP, which is not a rule, is unreasonably read so as not to account for delay caused by litigation, such delay becomes a tool for use by, and a reward for, a person dissatisfied with DEP’s outcome. In this case, the NTP was lawfully issued pursuant to compliant data, surveys, and analysis. As with any permit or license subject to a third- party challenge, the terms of the NTP are tolled pending Petitioners’ litigation, and do not become a ground for denial of the otherwise compliant Request. See § 120.60(1), Fla. Stat. (“An application for a license must be approved or denied within 90 days after receipt of a completed application unless a shorter period of time for agency action is provided by law. The 90-day time period is tolled by the initiation of a proceeding under ss. 120.569 and 120.57. Any application for a license which is not approved or denied . . . within 45 days after a recommended order is submitted to the agency and the parties, . . . is considered approved unless the recommended order recommends that the agency deny the license.”).4/ Furthermore, DEP has now received recent profile data from April 2019. The evidence establishes that the data provided to DEP as part of the Request includes the latest physical monitoring data over a period of greater than five years, and that the data collection met the standards for conducting physical monitoring. Fill Site Selection The NTP authorized “placement of dredged material in the swash zone east of East Pass.” In accordance with the Permit, that authorized area extends eastward from R-17 to R-20.5 and from R-23.5 to R-25.5, in Holiday Isle. The evidence is persuasive that placing dredged material on the eastern side of East Pass would not result in erosion on the western side of East Pass. Dredged material placed in the western beach placement area, and in the “shadow” of the western jetty, will tend to remain in that area. It would take a very long time, if at all, for that material to migrate further to the west. However, dredged material placed to the east of East Pass would, if the lateral shoreline drift is east to west as asserted by Petitioners (though not supported by a preponderance of the evidence as set forth in paragraphs 11 through 13), be introduced into the ebb shoal and likely move faster to the west as opposed to it being placed directly at the base of the west jetty. As such, placement of the dredged material on the eastern beach placement areas would, more likely than not, accomplish the beach effect objectives set forth in the Petition. The Eglin AFB Beach Restoration Project Petitioners relied heavily on photographs taken in 2010 and 2019 from roughly the same location in the vicinity of Monuments V-607 to V-608 to demonstrate that the beaches of Santa Rosa Island are eroding. The area depicted is outside of the area of influence of East Pass, and outside of the western beach placement area under the Permit. Those photographs depict a wide expanse of beach in 2010, with a seawall well upland from the shore in 2010. Then, in 2019, a photograph depicting the same stretch was offered that showed the same seawall, now at or below the water line. The photographs were, ostensibly, designed to depict naturally occurring erosion in the area. Mr. Clark testified that the seawall and boulder mound structure depicted in both photographs protect an Air Force mission-critical tracking facility. The seawall was originally constructed in 1979 after Hurricane Frederick, was constructed at that time to extend into the water, and was maintained in that configuration through the 1990s. One could not walk around the original seawall. Rather, for most of its history, passage around the seaward side of the seawall could only be accomplished by swimming or wading. The original seawall was damaged by Hurricane Opal, and destroyed by Hurricanes Ivan and Dennis in 2004 and 2005. The Air Force, needing to reconstruct the wall, applied for and received a joint coastal construction permit, allowing the structure to be constructed on sovereign submerged land below the line of mean high water. The seawall was rebuilt and, as stated by Mr. Clark, “it was in the water.” In 2010, the Air Force performed the small Eglin Air Force Base Beach Restoration Project, which placed artificial fill in front of the seawall, thereby creating a temporary beach. That beach fill project was “a one-shot deal,” did not involve any subsequent maintenance, and is now essentially gone, as was expected. Mr. Clark was neither surprised nor concerned with the fact that the area returned to what he described as its natural state, with the seawall below mean high water. The 2019 photograph was presented as evidence of erosion caused by East Pass. That was not the case. Rather, the 2010 photograph was evidence of an artificial and singular event, and the 2019 photograph depicts the natural state of the shoreline. Rather than depicting erosion, the 2019 photograph depicts a return to the stable shoreline that exists all along Santa Rosa Island to the west of East Pass. The photographs of the site of the 2010 Eglin Air Force Base Beach Restoration Project do not support a finding that the beaches of Santa Rosa Island are anything but stable, if not accretional, nor do they support a finding that the beaches of Santa Rosa Island are eroding. Ultimate Factual Conclusion Specific Condition 9 of the Permit requires the location of the spoil disposal be supported by the latest physical monitoring data over a minimum of five years in accordance with the East Pass IMP and the PMP. The greater weight of the competent substantial evidence establishes that the City submitted physical monitoring data consistent with the requirements of Specific Condition 9. The greater weight of the competent substantial evidence establishes that the eastern areas of influence of East Pass, including the beach disposal areas at R-17 to R-20.5 and R-23.5 to R-25.5, are critically eroded, a condition influenced if not caused by the East Pass, and constitute East Pass’s “adjacent eroding beaches.” Evidence to the contrary was not persuasive. The greater weight of the competent substantial evidence establishes that the western areas of influence of East Pass, including the beach disposal areas at Monuments V-611 to V-622, are stable, if not accreting, and are not East Pass’s “adjacent eroding beaches.” Evidence to the contrary was not persuasive. The greater weight of the competent substantial evidence establishes that the City met the standards for the NTP as proposed for issuance by DEP on February 2, 2018. Evidence to the contrary was not persuasive. Thus, the NTP should be issued.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Environmental Protection enter a final order: Approving the February 2, 2018, Notice to Proceed for the maintenance dredging of East Pass as authorized pursuant to Consolidated Environmental Resource Permit and Sovereign Submerged Lands Authorization No. 50-0126380-005-EI and State- owned Lease No. 0288799-003-JC, subject to the general and specific conditions set forth therein; and Denying the City of Destin’s Motion for Attorney’s Fees, Expenses and Costs pursuant to section 120.595(1). DONE AND ENTERED this 14th day of October, 2019, in Tallahassee, Leon County, Florida. S E. GARY EARLY Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 14th day of October, 2019.

Florida Laws (10) 120.52120.54120.56120.569120.57120.595120.60120.68161.14220.255 Florida Administrative Code (3) 62B-36.00262B-41.00262B-49.002 DOAH Case (5) 01-413203-246911-649512-342717-2201
# 2
SAVE OUR BEACHES, INC., AND STOP THE BEACH RENOURISHMENT, INC. vs DEPARTMENT OF ENVIRONMENTAL PROTECTION, CITY OF DESTIN, AND WALTON COUNTY, 04-002960 (2004)
Division of Administrative Hearings, Florida Filed:Sandestin, Florida Aug. 20, 2004 Number: 04-002960 Latest Update: Sep. 20, 2005

The Issue The issue in this case is whether the Department of Environmental Protection (DEP) should grant the application of the City of Destin (City) and Walton County (County) for a Consolidated Joint Coastal Permit (JCP) and Sovereign Submerged Lands Authorization (Application) to restore a 6.9 stretch of beach in the City and County.

Findings Of Fact The Gulf of Mexico beaches of the County and City were critically eroded by Hurricane Opal in 1995. The erosion problem was identified by DEP, which placed the beaches on its list of critically-eroded beaches, and by the County and City, which initiated a lengthy process of beach restoration through renourishment (also called maintenance nourishment.)1 The process, which included an extensive studies2 and construction design, as well as pre-application conferences with DEP staff, culminated in the filing of the Application on July 30, 2003. The Application proposed to dredge sand from an ebb shoal (i.e., a near-shore) borrow area south of (i.e., offshore from) East Pass in eastern Okaloosa County, using either a cutter head dredge (which disturbs the sand on the bottom of the borrow area and vacuums it into a pipeline which delivers it to the project area) or a hopper dredge (which fills itself and is moved to the project site). On the project site, heavy equipment moves the dredged sand as specified in the design plans. The project is executed in this manner and progresses along the beach, usually at a pace of about 300-500 feet a day. Each day work is in progress, public access to the beach is restricted for a length of about 500-1000 feet in the immediate vicinity of the area of beach being worked. Water Quality Increased turbidity is the primary water quality concern in a project of this nature. Increased turbidity can adversely impact submerged seagrasses and hard-bottom habitat, along with the benthic communities depending on them. When sand in the borrow area is disturbed by dredging, sand and silt become suspended and increase turbidity to some extent and for some duration, depending primarily on the nature of the bottom material and the dredging method. (The cutter head dredge vacuums most if not all of the disturbed sand and silt into the pipeline while, by comparison, the hopper dredge would result in higher turbidity in the water in the borrow area.) Sand delivered to the project site via pipeline must remain suspended in water for transport. When the sand is deposited on the beach, the excess water, with suspended particulate matter, will drain off and return to the Gulf of Mexico. Even if hopper dredges are used, and if material is deposited on the project site other than via pipeline, some of the material will be deposited in the littoral zone, and some material deposited landward of the waterline will be inundated by the tides and wave action and potentially re-suspended in water in the littoral zone. If the water is turbid upon discharge in the littoral zone, the near-shore can become more turbid. Sand Quality The primary determinant of the amount and duration of turbidity generated in the borrow area and in the littoral zone of the project site is the quality of the bottom material in the chosen borrow area. The coarser the material, the less turbidity. The best quality bottom material usually is found in the kind of borrow area proposed for use in the Application. Sand in the borrow area came from some of Florida's finest beaches. It has been cleaned of fine material (silt) not only by wave action but also as the sand moved along shore in the littoral zone and by the currents in the East Pass inlet. Numerous tests of the bottom material in the proposed ebb shoal borrow for the project indicate that it generally has less than one percent silt. Expert witnesses for the City, County, and DEP testified that, with such low silt content, turbidity increases of no more than 5-10 Nephalometric Turbidity Units (NTUs) above background levels are expected at the edge of the mixing zone--150 meters down- current from the borrow area, and down-current and offshore from the discharge points on the beach. Moreover, they testified that turbidity levels are expected to return to background levels quickly (i.e., within an hour or so.) SOB and STBR questioned whether the experts could be certain of their testimony based on the test results. But SOB and STBR called no expert to contradict the testimony, and it is found that the expert testimony was persuasive. Standard Mixing Zone Initially, the City and County applied for a variance from the turbidity standards to allow them to exceed 29 NTUs more than 150 but less than 1660 meters down-current from the borrow area, and down-current and offshore from the discharge points, based on Attachment H, the Water Quality Impact analysis in the Application. The analysis was based on an assumption of five percent silt content in the bottom material in the borrow area. SOB and STBR attempted to use the five percent assumption to impeach the expert testimony on water quality. But when the quality of the bottom material was ascertained to be less than one percent, the variance request was withdrawn at DEP's request as being unnecessary and therefore inappropriate. SOB and STBR also argued in their PRO that, if a 1660-meter mixing zone was needed for five percent fines, then a 332-meter mixing zone would be needed for one percent fines. This argument was based entirely on counsel's arithmetic extrapolation. There was no evidence in the record from which to ascertain the validity of the extrapolation. In addition, the evidence was that the bottom material in the borrow area in this case will be less than one percent fines. Shore-Parallel Sand Dike Specific Condition 6 of the Draft Permit requires the permittee to "construct and maintain a shore-parallel sand dike at the beach placement area at all times during hydraulic discharge on the beach to meet turbidity standards prescribed by this permit." The shore-parallel sand dike is essentially a wall of sand built parallel to the shoreline to keep the sand slurry (the mixture of sand and water) being pumped onto the beach from washing back in the water, thereby giving the materials more time to settle out of the water before the water returns to the Gulf of Mexico. Even if this condition were not in the Draft Permit, the City and County would be required to build the dike since it is part of their design for construction of the Project. Turbidity Monitoring The Application included a proposal to monitor turbidity, and the Draft Permit includes the proposed monitoring as a Specific Condition 38. Every six hours during dredging and pumping operations, the City and County are required to sample 150 meters down-current of the borrow area, and down-current and offshore of the discharge point, and report the results to DEP within a week. In addition, Specific Condition 38 requires work to stop if turbidity standards are exceeded, which must be reported immediately. Work may not proceed "until corrective measures have been taken and turbidity has returned to acceptable levels." If more than one exceedence of the turbidity standard is reported, DEP will require the City and County to redesign the project to address and cure the problem. These conditions are part of the reasonable assurance that water quality standards will not be violated. Sediment Quality Control/Quality Assurance Plan Pursuant to Special Condition 4.b. of the Draft Permit, the City and County are required to do a Sediment Quality Control/Quality Assurance Plan, which requires them to measure the quality of the sand as it comes out of the pipeline before it can cause a turbidity problem. If the dredge hits pockets of bad material, which is not expected in this case, work could be stopped before it creates a turbidity problem. Absence of Natural Resources in Project Area DEP performed side-scan sonar tests in the vicinity of both the borrow site and near-shore in the Project area and determined that there were no hard bottoms or seagrasses in either area. Therefore, there are no natural resources within the project area that would be covered or placed in jeopardy by a turbidity plume. Reasonable Assurance Given For all of these reasons, the City and County have provided reasonable assurance that water quality standards will not be violated. Required Riparian Interest Generally, and in the beach nourishment project area, the BOT owns seaward of the mean high water line (MHWL). The City and County own some but not all of the beachfront landward of the MHWL.3 In anticipation of the beach nourishment project, the City and County had the MHWL surveyed as of September 7, 2003.4 The surveys state that the MHWL as of that date shall also be known as the ECL. The surveys also depict the landward and seaward limits of construction and the predicted post-construction MHWL. The surveys indicate that construction is planned to take place both landward and seaward of the ECL. The predicted post-construction MHWL is seaward of the ECL. By resolution, the BOT approved the surveys and established the ECLs for the Project. The City survey was approved, and ECL established, on December 30, 2004; the County survey was approved, and ECL established, on January 25, 2005. The BOT's decisions are being challenged in court. If the decisions are upheld, the BOT intends to file its resolutions and record the surveys. There was no evidence that the City and County have an easement or the consent of all of the other beachfront owners to undertake the proposed beach nourishment project. Some of the other beachfront owners do not consent, including members of SOB and STBR. Standing SOB was incorporated not-for-profit in Florida on January 28, 2004. STBR was incorporated not-for-profit in Florida on February 16, 2004. Both were incorporated to protect and defend the natural resources of the beaches, protect private property rights, and seek redress of past, present, and future unauthorized and/or inappropriate beach restoration activities. No evidence was presented by any party as to whether SOB and STBR have filed their annual reports with the Department of State, and no party filed a Department of State certificate of status as to either SOB or STBR. STBR has six members, all owners of beachfront property in the area of the proposed beach nourishment project.5 SOB has approximately 150 members. These members own approximately 112 properties in the City, approximately 62 of which are beachfront and the rest condominium units of beachfront condominium developments. However, it is not clear from the evidence how many of these beachfront properties are in the area of the proposed beach nourishment project (beyond the four owned by Linda Cherry, who testified). The testimony of Slade Lindsey was sufficient, together with member affidavits, to prove that all six members of STBR use the beaches and waters of the Gulf of Mexico adjacent to the Project area for swimming, fishing, boating, and/or enjoying beach and Gulf vistas. As a result, the construction of the Project will affect their interests at least during the time construction is taking place near their property. If the Project were to result in violations of water quality standards for turbidity, their interests would be affected as long as the violations lasted and perhaps longer if lasting damage to natural resources were to result. However, as found, there will not be any lasting damage to natural resources, and reasonable assurance was given that no water quality violations will occur and that exceedences of water quality standards in the mixing zone will be of short duration, lasting for no longer than an hour. These effects will not be substantial. The evidence was not sufficient to prove that construction of the Project will affect the interests of a substantial number of the members of SOB. First, it was not clear how many of them own beachfront property or even condominium units in developments adjacent to the Project area. Second, the only witness on the subject, Linda Cherry, does not know all of SOB's members and did not state how many of the 39 SOB members who signed affidavits as to their use of the beaches and waters of the Gulf of Mexico adjacent to the Project area are known to the witness. Even if a substantial number would be affected, their interests would be affected no more than the STBR members' interests.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that DEP enter a final order issuing Draft Permit DEP JCP File No. 0218419-001-JC. DONE AND ENTERED this 30th day of June, 2005, in Tallahassee, Leon County, Florida. S J. LAWRENCE JOHNSTON Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 30th day of June, 2005.

Florida Laws (19) 120.569120.57161.041161.088161.141161.161161.181161.191161.201161.211161.212253.03253.141253.77373.414403.031403.412617.0128617.1622
# 3
AGENCY FOR HEALTH CARE ADMINISTRATION vs RITA MACK, 01-002506PL (2001)
Division of Administrative Hearings, Florida Filed:West Palm Beach, Florida Jun. 27, 2001 Number: 01-002506PL Latest Update: Dec. 25, 2024
# 7
DEPARTMENT OF HEALTH vs JEAN-ANTOINE PIERRE, 13-002264PL (2013)
Division of Administrative Hearings, Florida Filed:West Palm Beach, Florida Jun. 18, 2013 Number: 13-002264PL Latest Update: Dec. 25, 2024
# 8
WALTON COUNTY AND W. L. "BILLY" MCLEAN vs. DEPARTMENT OF NATURAL RESOURCES, 82-000132 (1982)
Division of Administrative Hearings, Florida Number: 82-000132 Latest Update: Jul. 30, 1982

Findings Of Fact Marvel O. Warren and his brother Dan own a parcel of beachfront property in Walton County, south of State Road 30A (SR30A) near Seagrove Beach. Like Mr. Warren, the other intervenors own beachfront in the area, which lies in County Commission District Five. In 1954, before the Warrens built their house landward of the dunes, no road ran toward the beach from SR30A. Construction traffic to the house site beat down a path, however. In Walton County, each county commissioner is responsible, within the district he represents, for road maintenance and, on existing county right-of- way, for construction of new roads. DNR's Exhibit No., 7; Testimony of Owens. Expenditures in excess of $500 for materials beyond what the county has stockpiled require approval by the full commission, however. Testimony of Owens. FIRST ROAD BUILT Albert Gavin of Freeport was county commissioner for District Five when, in 1958 or 1959, he caused a red clay road to be built from SR30A southerly along the eastern edge of the Warren property over sand dunes and onto the beach to within 20 or 30 feet of the water's edge. During Mr. Gavin's tenure, the county owned a borrow pit and kept no records of how much clay was placed where. (No records of the quantity of clay deposited on the beach at any time were offered in evidence at the hearing.) Fishermen used the road to launch boats into the Gulf of Mexico. Except for any portion that may have extended onto sovereignty land, the road lay on county-owned right-of-way. UPLAND SEGMENT PERMANENT The clay road landward of the sand dunes leading along the eastern edge of the Warren property to SR30A (the upland road) has been consistently maintained and in existence since it was originally built. The upland road ends at the bluff line, which is practically congruent with the coastal construction control line at that point on the coast. DNR's Exhibit No. 4; Testimony of Hill. At some time between 1960 and 1969, also landward of the subsequently established coastal construction control line, a clay parking lot was built adjacent to the upland road. BEACH SEGMENTS EVANESCENT Whenever clay has been placed on the beach, seaward of the crest of the landwardmost sand dune, the gulf has washed it away. Many clay roads at the site did not last the summer. Virtually no clay deposit has lasted longer than a full year. One attempt after another to construct a clay road seaward of the sand dunes (the beach segment) has failed. Witnesses testified that the sun bleached the red clay and that wind covered it with white sand but wave action has been the clay's principal nemesis. When Harold C. Lucas was commissioner for District Five from March, 1968, to January, 1969, no clay was deposited on the beach and there was no beach segment. Except for three months in 1975 when Van Ness R. Butler, Jr., of Grayton Beach, served as District Five's county commissioner, Conley Martin of Portland represented the district from 1969 to 1976. As county commissioners, both of these men directed clay to be placed on the beach at various times. COASTAL CONSTRUCTION CONTROL LINE ESTABLISHED A beach segment was in existence at the time the coastal construction control line was established, and recorded, on June 4, 1975, although the beach segment that then existed went straight from the foot of the sand dune toward the edge of the gulf, instead of veering east like the new; longer beach segment built last September. THEN EXISTING ROAD DESTROYED, REPLACED In September of 1975, Hurricane Eloise removed not only the beach segment of the road but much of the beach, including the dunes themselves. As road foreman for District Five at the time, Robert N. Budreau used a road grader and other equipment to fill a large hole between the Warren house and the sand dune and to cover over broken toilets and other debris with a mixture of sand and yellow clay. After the filling, a roadway was constructed with the same sand and clay mix, extending about 25 feet seaward of the dunes along a line perpendicular to the gulf shore. REPLACEMENT ROAD RECLAIMED BY ELEMENTS In 1976, Freddie M. Bishop was elected county commissioner for District Five. After the beach segment built by Mr. Budreau washed out, at least one constituent, Gene Wesley, asked Mr. Bishop to replace it, but Mr. Bishop broke with sisyphean tradition, and declined to place any clay on the beach, or otherwise attempt to reconstruct or replace the beach segment. By the time petitioner McLean succeeded Bishop as commissioner for District Five, the beach segment had been completely obliterated. The end of the upland road continued, however, to be one of some half-dozen points of access for four-wheel drive vehicles to Walton County's gulf beaches. Commissioner Bishop did cause two truckloads of oyster shells to be deposited on the "hump" of the landward sea dune, on or near the bluff line. NEW BEACH SEGMENT In response to constituents' requests, Mr. McLean ordered a new road built. He caused clay and gravel to be placed and compacted seaward of the coastal construction control line by county workmen and machinery, including some "borrowed" for the purpose from colleagues on the Walton County Commission. Built without a DNR permit in September of 1981, this new beach segment extends 180 feet seaward of the coastal construction control line and takes an unprecedented veer to the east. The only preexisting foundation for the new beach segment was the beach itself. Like Commissioner Anderson, Commissioner W. F. Miles "lent" county trucks he had charge of to respondent McLean, but Mr. Miles did not know in advance that Mr. McLean intended to use them to build a road on the beach. Commissioners Matthews, Miles, and Owens were aware of the existence of the coastal construction control line in Walton County and, in a general way, of DNR permitting requirements and procedures, including the fact that the County Commission itself acts on certain coastal construction applications. Commissioners Anderson and McLean did not testify on these matters. DNR has issued no permit for anything like the new beach segment at any time since the coastal construction control line wad established. DNR has no record of any inquiry concerning the new beach segment by or on behalf of petitioners McLean or Walton County, before the new beach segment was built. There was no showing that Mr. McLean sought legal advice before ordering construction of the new beach segment. Paragraphs 1 through 8 of DNR's "Final Order," as amended at the final hearing and set forth above, have been established by stipulation of the parties. The hearing officer has had the benefit of posthearing submissions, including proposed findings of fact, filed by all parties. Proposed findings have been adopted, in substance, where relevant, except when unsupported by appropriate evidence.

Recommendation Upon consideration of the following, it is RECOMMENDED: That DNR order petitioner Walton County to remove the new beach segment seaward of the Walton County Coastal Construction Control Line within 30 days of entry of a final order. That DNR remove the new beach segment seaward of the Walton County Coastal Construction Control Line itself, in the event of petitioner Walton County's noncompliance with the final order; and take steps to recover the cost from petitioner Walton County. That DNR impose no civil or administrative fine against petitioner W. L. "Billy" McLean. DONE AND ENTERED this 30th day of July, 1982, in Tallahassee, Florida. ROBERT T. BENTON, II Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 30th day of July, 1982. COPIES FURNISHED: George Ralph Miller, Esquire Post Office Box 687 DeFuniak Springs, Florida 32433 W. Dennis Brannon, Esquire Post Office Box 1503 Fort Walton Beach, Florida 32549 Deborah A. Getzoff, Esquire Department of Natural Resources 3900 Commonwealth Boulevard Tallahassee, Florida 32303 M. Stephen Turner, Esquire Post Office Drawer 591 Tallahassee, Florida 32303 Elton J. Gissendanner Executive Director Department of Natural Resources 3900 Commonwealth Boulevard Tallahassee, Florida 32303

Florida Laws (3) 120.57161.053161.054
# 9
DEPARTMENT OF HEALTH, BOARD OF DENTISTRY vs THOMAS P. FLOYD, D.M.D., 13-000511PL (2013)
Division of Administrative Hearings, Florida Filed:West Palm Beach, Florida Feb. 12, 2013 Number: 13-000511PL Latest Update: Dec. 25, 2024
# 10

Can't find what you're looking for?

Post a free question on our public forum.
Ask a Question
Search for lawyers by practice areas.
Find a Lawyer