SARASOTA COUNTY vs. DEPARTMENT OF ENVIRONMENTAL REGULATION, 86-002462 (1986)
Division of Administrative Hearings, Florida Number: 86-002462 Latest Update: Jan. 22, 1987

The Issue The issue in this case is whether Falconer is authorized to keep finger piers, a wooden deck and an enclosed walkway, which were constructed without permits within the landward extent of Elligraw Bayou, a Class 3 waterbody located in Sarasota County, upon the payment of a $3600 penalty. Specifically, the issue is whether the piers, deck and covered walkway, as built, would have been permitted by the Department if properly applied for, and whether Falconer has provided reasonable assurances that these structures, and the alteration of mangroves in connection therewith, will not violate state water quality standards, and will not be contrary to the public interest as provided in Section 403.918(2), Florida Statutes. POSITION OF PARTIES This controversy between the parties arises out of the entry of a Consent Order between the Department and Falconer, to which the County objects. It is the County's position that the Department abused its discretion by attempting to authorize unpermitted activities without requiring compliance with permitting criteria and standards. Specifically, the County contends that Falconer has failed to provide, and the Department has not required, reasonable assurances based on plans, test results or other information that the structures in or over Elligraw Bayou, as well as Falconer's alteration of mangroves, will not violate state water quality standards, and will not be contrary to the public interest. The Department and Falconer contend this is strictly an enforcement case which settles claims of violations the Department had against Falconer, and that this is not a case involving a permit application. The Department urges that it exercised prosecutorial discretion in the procedure that it followed in settling this enforcement matter.

Findings Of Fact The following findings of fact are based upon the stipulation of the parties: The Department is the administrative agency of the State of Florida charged with the responsibility to protect Florida's air and water resources, and to administer and enforce Chapter 403, Florida Statutes, and the regulations promulgated thereunder contained in Chapter 17, Florida Administrative Code. Falconer is the record owner of real property at the northwest corner of the intersection of Southpointe Drive and U.S. Highway 41 in Sarasota County, being in Section 21, Township 37 South, Range 18 East. Sarasota County is a chartered political subdivision of the State of Florida with all powers provided by law. Sarasota County has standing to bring this action. In May of 1963, Sarasota County acquired from Falconer's predecessor in title a perpetual nonexclusive easement over certain lands upon the property described in Finding of Fact 2. In July of 1973, Falconer acquired title to the property described in Finding of Fact 2, subject to the easement described in Finding of Fact 4. Falconer's property is located within the landward extent of Elligraw Bayou, which is a Class 3 state water as defined in the Florida Administrative Code, but the water does not bear the designation of Outstanding Florida Water as defined in the Florida Administrative Code. Unless exempt, a permit from the Department is required to dredge or fill within the landward extent of Elligraw Bayou, pursuant to applicable law and rules. Falconer received Permit No. DF58-32115-3E, dated March 3, 1981, to construct a commercial floating dock covering approximately 1,856 square feet on Elligraw Bayou. He did not build the floating dock to the size and configuration approved in the permit described in Finding of Fact 7. Falconer caused or allowed the installation of twelve stationary finger piers and one wooden deck within the landward extent of Elligraw Bayou between June 1981 and November 1982. However, he did not have a permit from the Department to construct these twelve finger piers and the wooden deck within the landward extent of state waters and Elligraw Bayou. Falconer caused or allowed the construction of an enclosed walkway over a drainage easement within the landward extent of Elligraw Bayou, and parts of the poured cement base foundation of the walkway are also within the landward extent of Elligraw Bayou. The cement was poured around the base of two mangroves, and a total of four mangroves were altered during construction. He did not have a permit from the Department for any dredging and/or filling within the landward extent of Elligraw Bayou in connection with the construction of the enclosed walkway described in Finding of Fact 11. Falconer did not have a permit to alter mangroves. The Department did not require, and Falconer did not submit any plans, test results or other information regarding the impact of the twelve finger piers, wooden deck, the enclosed walkway or the altered mangroves upon the water quality of Elligraw Bayou. Additionally, the Department did not require, and Falconer did not submit a hydrographic study demonstrating the flow of water within Elligraw Bayou, predicting the effect of dredging and/or filling on the flow of water, or predicting areas of erosion or shoaling. On June 3, 1986, the Department and Falconer entered into a Consent Order regarding the unpermitted activities described in Findings of Fact 8 through 13, above. The County timely filed a Petition for Formal Hearing challenging the entry of the above-referenced Consent Order. Respondent Falconer has complied with the requirements of the Consent Order. The County did not file a petition challenging the original Department permit referred to in Finding of Fact 7. The following findings of fact are based upon the evidence presented at hearing, as well as the demeanor and credibility of witnesses: On February 5, 1986, Eva Bailey of the Department's enforcement section inspected Falconer's property, and she again inspected the site on November 12, 1986. Regarding the finger piers, Bailey observed that there had been no adverse impact on the littoral zone, and no water quality or other environmental damage as a result of their construction. She similarly found that alteration of mangroves during the construction process did not result in any observed environmental damage. Only the columns associated with the walkway encroach upon the Department's jurisdiction, and Bailey found no significant adverse impact on the littoral zone resulting from the walkway construction. In fact, she found that the walkway support columns are providing a habitat for water species. According to Bailey, there has been no shoaling or erosion as a result of Falconer's construction, there has been no adverse affect on fish or wildlife, navigation has not been impeded, and there has been no damage to the public health, safety or welfare. Bailey recommended that the Department enter into an agreement with Falconer after discussing the matter with James R. Brice, a supervisor with the Department at the time. He had inspected the area in April 1985, and concluded that it was permittable. Brice confirmed Bailey's testimony that Falconer's construction has not resulted in erosion, shoaling, damage to the public health, safety or welfare, damage to fish or wildlife, a degradation of water quality, or any impairment to navigation. At the time of his inspection in April 1985, Brice referred the matter to the enforcement section because the walkway footings had been built in state waters without a permit. Neither a violation warning notice, or a formal notice of violation, were ever issued by the Department to Falconer regarding this construction, according to Craig McArthur, Bailey's supervisor in early 1986 when she conducted her inspection and recommended the issuance of the Consent Order. Thus, enforcement proceedings were never formally initiated by the Department against Falconer. Rather, Brice visited the site in April 1985 in response to complaints, and requested the inspection which Bailey conducted in February 1986. Since both Bailey and Brice found conditions which lead the Department to conclude that the construction was permittable, an agreement with Falconer was pursued by the Department which then lead to the Consent Order. Under the terms of the Consent Order, Falconer would be authorized to retain the finger piers and walkway without any modifications, in return for payment of $3600. McArthur testified that the permittability of construction is an essential factor in, and precondition for, any Consent Order which does not require modifications. Falconer's property is located at the enclosed end of Elligraw Bayou. A restaurant, shopping area, and spaces for associated parking are located on the upland portion of the property. Falconer has leased the finger piers, as well as the area surrounding certain floating docks not at issue in this case, to a sailboat sales company for use as a marina. There are no fuel facilities for boats and live-aboard boats are not permitted on the leased premises. Due to the controversy and uncertainty concerning the continued use of the finger piers, the sailboat sales company will not renew its current lease, but Falconer testified he intends to lease the facility to another sailboat sales company. The cost to construct the finger piers was approximately $11,000, and construction costs associated with the enclosed walkway were approximately $75,000. The walkway connects the restaurant with the piers, floating docks and parking area, and was constructed, in part, over the County's drainage easement pursuant to County building permit 114-U in late 1984 and early 1985. Elligraw Bayou was deeply dredged by the County in 1979. Its banks are vertical without any natural sloping. It serves as the receiving body for a 660 acre drainage basin for water flowing from highway culverts and upland drainage ditches. The water in the Bayou is murky and one cannot see the bottom due to runoff from U.S. 41 and surrounding uplands which flows into Elligraw Bayou through an open drainage ditch. During a ten year storm event, 150 to 160 cubic feet per second of runoff would be expected to flow into the Bayou. According to Charles Goode, Sarasota County Engineer and Director of Transportation, the covered walkway which Falconer has constructed will inhibit the County's future maintenance dredging of Elligraw Bayou and the drainage ditch leading to the Bayou. The use of a drag-line for maintenance dredging of the Bayou will no longer be possible, as it was in 1979. Regular maintenance of drainage ditches is essential to maintain the natural flow of runoff and prevent upland flooding. The County will no longer be able to use track mounted equipment to maintain the ditch leading into Elligraw Bayou, but other, more labor intensive, methods are available. The County does not regularly maintain this ditch. Manatees have been sited in the general vicinity of Elligraw Bayou, although there is no evidence of any sitings in the Bayou itself. In approximately 1982, the Department required Falconer to place signs in the Bayou to warn boaters about manatees, and Falconer complied. The manatee is an endangered species and is attracted to fresh water, such as exists in the Bayou. Increased motor boat traffic is a danger to manatees, but there is no evidence of any increase in such traffic due to Falconer's construction. The Director of Natural Resources Management for Sarasota County, Jack Merriam, testified that he has not heard of any reports of navigation problems in Elligraw Bayou, or seen any evidence of accidents since Falconer completed the construction here at issue, despite the fact that there is only a thirty foot width available for navigation in the Bayou at one point. However, as an expert in the impact on navigation of coastal structures, Merriam testified that a thirty foot area would not be a safe area in which to navigate under certain conditions, and that the finger piers present significant-navigational problems. No study has been made of boating traffic in Elligraw Bayou, however, to determine if unsafe conditions actually exist in this Bayou. Falconer cooperated fully with the Department throughout these proceedings in seeking its authorization for the construction here at issue.

Recommendation Based upon the foregoing, it is recommended that the Department issue a Final Order approving the Consent Order which it has previously executed with Ronald W. Falconer. DONE AND ENTERED this 22nd of January 1987 in Tallahassee, Florida. DONALD D. CONN Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 22nd day of January 1987. APPENDIX (DOAH Case No. 86-2462) Rulings on Proposed Findings of Fact filed by Sarasota County: Adopted in Finding of Fact 1. Adopted in Finding of Fact 2. Adopted in Finding of Fact 3. Adopted in Finding of Fact 4. Rejected as cumulative and unnecessary. Adopted in Finding of Fact 5. Adopted in Finding of Fact 6. 5 Adopted in Finding of Fact 7. Adopted in Finding of Fact 5. Adopted in Finding of Fact 9. Adopted in Finding of Fact 10. Adopted in Findings of Fact 11, 24. 13-14 Adopted in Finding of Fact 11. Rejected since this is a conclusion of law. Adopted in Finding of Fact 12. Adopted in Finding of Fact 13. 15 Adopted in Finding of Fact 20. Rejected as irrelevant and unnecessary. Adopted in Finding of Fact 14. 21-22 Rejected as irrelevant and unnecessary. Adopted in Finding of Fact 14. Rejected as irrelevant and otherwise addressed in Finding of Fact 22. 25-34 Adopted in Findings of Fact 14, 21 but otherwise rejected as irrelevant and unnecessary. 35 Adopted in Finding of Fact 23. 36-37 Rejected as irrelevant and otherwise simply a summation of testimony. 35 Adopted in Finding of Fact 7, but otherwise rejected as irrelevant and not based on competent substantial evidence. Adopted in Finding of Fact 14. Rejected as irrelevant and unnecessary. 41-43 Adopted in Finding of Fact 25. 44-46 Adopted in Finding of Fact 26. 47 Adopted in Finding of Fact 25 but otherwise rejected as cumulative and not based on competent substantial evidence. 45-50 Adopted in Finding of Fact 25. 51-56 Adopted in Finding of Fact 27, but otherwise rejected as irrelevant and unnecessary. Rulings on Proposed Findings of Fact filed on behalf of the Department of Environmental Regulation: Adopted in Finding of Fact 1. Adopted in Finding of Fact 2. Adopted in Finding of Fact 3. Adopted in Finding of Fact 6. Adopted in Findings of Fact 7-9. Adopted in Findings of Fact 10-13. Adopted in Findings of Fact 14, 15. 5 Adopted in Findings of Fact 16-19. Adopted in Finding of Fact 20. Adopted in Finding of Fact 21. 11-12 Rejected as irrelevant and unnecessary. Adopted in Finding of Fact 22. Adopted in Findings of Fact 20, 25. Adopted in Finding of Fact 20. 16-17 Adopted in Finding of Fact 27, but otherwise rejected as unnecessary and cumulative. Adopted in Findings of Fact 20, 21, 25. Adopted in Finding of Fact 22. Adopted in Findings of Fact 20-22. Adopted in Findings of Fact 22, 29. Adopted in Finding of Fact 20. Adopted in Finding of Fact 25. Adopted in Findings of Fact 23, 27. Rulings on Proposed Findings of Fact filed on behalf of Ronald W. Falconer: Adopted in Finding of Fact 1. Adopted in Finding of Fact 2. Adopted in Finding of Fact 3. Adopted in Finding of Fact 4. Adopted in Finding of Fact 5. Adopted in Findings of Fact 2, 6. Adopted in Finding of Fact 6. Adopted in Finding of Fact 7. Adopted in Findings of Fact 5, 9. Adopted in Finding of Fact 27, but otherwise rejected as irrelevant and unnecessary. Adopted in part in Findings of Fact 11, 24, but otherwise rejected as irrelevant and unnecessary. 12-13 Adopted in part in Finding of Fact 29, but otherwise rejected as Irrelevant and unnecessary. Rejected as irrelevant and unnecessary. Adopted in part in Findings of Fact 14-16, but otherwise rejected in Finding of Fact 22. Adopted in Findings of Fact 14-16. Adopted in Findings of Fact 15, 20-22, 29. 15-20 Adopted in Findings of Fact 20, 21. Adopted in Findings of Fact 20, 21, 25. Adopted in Findings of Fact 20, 21. Adopted in Findings of Fact 20, 21, 25. Adopted in part in Finding of Fact 24, but otherwise rejected as irrelevant. Rejected as irrelevant and unnecessary. Adopted in Finding of Fact 24. 27-25 Rejected as irrelevant and unnecessary. 29-31 Adopted in part in Findings of Fact 23, 25, but otherwise rejected as irrelevant and unnecessary. Adopted in Finding of Fact 4. Adopted in Finding of Fact 26. Rejected as irrelevant and unnecessary. COPIES FURNISHED: Wallace L. Storey, Esquire David M. Levin, Esquire P. O. Box 5 Sarasota, FL 33575 David K. Thulman, Esquire Twin Towers Office Building 2600 Blair Stone Road Tallahassee, FL 32399-2400 William M. Hereford, Esquire 1299 South Tamiami Trail, #1233 Sarasota, FL 33579 Dale Twachtmann Secretary Twin Towers Office Building 2600 Blair Stone Road Tallahassee, FL 32399-2400 =================================================================

Florida Laws (7) 120.52120.57120.68403.031403.087403.121403.161
# 1
HARBOR ESTATES ASSOCIATES, INC. vs. E. BURKE AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 89-002741 (1989)
Division of Administrative Hearings, Florida Number: 89-002741 Latest Update: Jan. 08, 1993

The Issue This proceeding concerns an Intent to Issue a dredge and fill permit given by the Department of Environmental Regulation ("DER") to Respondent, Edmund Burke ("Burke"), for construction of a retaining wall and wooden pile-supported bridge crossing a portion of the South Fork of the St. Lucie River in Martin County, Florida. The ultimate issues for determination are whether Petitioner has standing to challenge the proposed DER action, and if so, whether the proposed agency action complies with the requirements of Sections 403.91 through 403.938, Florida Statutes, and applicable rules.

Findings Of Fact Respondent, Edmund Burke, on January 15, 1988, filed with the Department of Environmental Regulation ("DER") application number 431441608 for a permit to construct a permanent, pile supported, wooden bridge approximately 80 feet long and 10 feet wide connecting the mainland with an island in the South Fork of the St. Lucie River in Martin County, Florida. The bridge was to span a 50 foot canal or creek ("channel") in the River. One of two retaining walls was to be located on the mainland peninsula. The other retaining wall was to be located on the island (the "initial project"). Between January 15, 1988, and April 28, 1989, the initial project was modified by Respondent, Burke, to satisfy DER concerns over potential impacts, including secondary impacts, relevant to the application. The width of the bridge was reduced from 10 feet to 6 feet. The retaining wall initially planned at the point where the bridge intersects the island was eliminated. The retaining wall on the mainland side of the bridge was relocated above mean high water. Sixty feet of the proposed bridge runs from mean high water to mean high water. An additional 10 feet on each end of the bridge is located above mean high water. The project remained a permanent, pile supported, wooden bridge (the "modified project"). The Intent to Issue, dated April 28, 1989, indicated that the modifications required by DER had been made, that the modifications satisfied DER concerns relevant to the initial project, and that DER intended to issue a permit for construction of the modified project. The elimination of the retaining wall obviated any necessity for backfill on the island. The reduction in the width of the bridge virtually eliminated the secondary impacts on the surrounding habitat, resulted in less shading of the water, and precluded vehicular traffic over the bridge. The final modification that was "necessary in order for [DER] to approve this application" was the reduction in the width of the bridge from 10 feet to 6 feet. Petitioner's Exhibit 17. DER's requirement for this final modification was communicated to Mr. Cangianelli in a telephone conversation on April 6, 1989 (Petitioner's Exhibit 18), and memorialized in a letter to Respondent, Burke, on April 14, 1989 (Petitioner's Exhibit 17). The final modification was made, and the Intent to Issue was written on April 28, 1989. Petitioner's Case. Property commonly known as Harbor Estates is adjacent to the site of the modified project. A constructed harbor and contiguous park are located within the boundaries of Harbor Estates. Both are used by residents of Harbor Estates and both are proximate to the site of the modified project. The harbor entrance and site of the modified project are located on opposite sides of a peninsula approximately 40 feet wide and approximately 125 feet long. Boats operated by residents of Harbor Estates that can navigate under the modified project need only travel the length of the peninsula, a distance of approximately 125 feet through the channel, in order to reach the harbor entrance. Boats operated by residents of Harbor Estates that cannot navigate under the proposed bridge must travel around the island, a distance of approximately 1800 feet in the main body of the St. Lucie River, in order to reach the harbor entrance. However, Petitioner presented no evidence that prior to the construction of the bridge the channel was navigable by boats not capable of passing under the bridge after the bridge was completed. Petitioner, Harbor Estates Associates, Inc., submitted no evidence to show facts necessary to sustain the pleadings in the Petition concerning the inadequacy of modifications required by DER. Of Petitioner's 26 exhibits, Exhibits 1-19, 24 and 25 were relevant to the initial project but were not material to claims in the Petition concerning the inadequacy of the modifications required by DER. Petitioner's Exhibit 20 was cumulative of DER's Exhibit 6B. Petitioner's Exhibits 22 and 26, respectively, concern a 1980 bridge permit and a Proposed Comprehensive Growth Management Plan for Martin County, Florida. Petitioner offered no expert testimony in support of the pleadings in the Petition including assertions that: the modified project will have a direct adverse impact upon water quality and the welfare or property of others; the channel is navigable by deep-draft motor vessels; the modified project will result in shoaling that will have to be corrected at the expense of Harbor Estates; the modified project will result in prohibited destruction of mangroves; or that the modified project will cause any of the other specific adverse effects described in the Petition. The testimony of fact witnesses called by Petitioner was not material to Petitioner's claims that modifications required by DER were inadequate. The testimony of Bob Nicholas was relevant to allegations of prior violations but was not dispositive of any issue concerning the adequacy of modifications required by DER. The testimony of William Burr was admitted as rebuttal testimony relevant to precedents in the general area of the modified project but failed to address the adequacy of modifications required by DER. Petitioner consistently demonstrated a lack of knowledge of the applicable law, the proper scope of the formal hearing, and the distinction between argument and evidence. Petitioner repeatedly attempted to establish violations of laws not relevant to the proceeding including local laws and other environmental laws. Petitioner attempted to establish issues by arguing with witnesses during direct and cross examination, and by repeatedly making unsworn ore tenus representations of fact. There was a complete absence of a justiciable issue of either law or fact in this proceeding because Petitioner failed to show facts necessary to sustain the pleadings. Petitioner presented no evidence refuting Respondent, Burke's, showing that the modifications required by DER were adequate to assure water quality and the public health, safety, or welfare, or the property of others. Evidence presented by Petitioner was not material to the issue of whether the modifications required by DER were adequate for the purposes of the law applicable to this proceeding. Therefore, Petitioner participated in this proceeding for a frivolous purpose, primarily to cause unnecessary delay, or to needlessly increase the cost of licensing or approval of the proposed activity. Respondents' Case. The island to be accessed by the modified project is approximately 2.5 acres in area and contains mostly wetland. The island is approximately 900 feet long. The portion of the island that is beyond DER permit jurisdiction is less than 200 feet long and less than 50 feet wide. The site of the modified project is located in Class III waters. Respondent, Burke, provided adequate assurances that portions of the modified project not extending over open water will be constructed upon property owned by him. The single retaining wall to be constructed at the southeastern terminus of the modified project will be constructed landward of DER jurisdiction. The modified project permits neither the installation of water or electrical conduits to the island nor any excavation, filling, or construction on the island. Respondent, Burke, must provide notification to DER before any such activity is begun. The bridge will accommodate no vehicular traffic larger or heavier than a golf cart. Golf cart access is necessary in order to accommodate a physical disability of Respondent, Burke. The modified project employs adequate methods to control turbidity, limit mangrove alteration on the island, and limit potential collisions with manatees. Vegetation, including mangroves, will not be removed. Incidental, selective trimming of vegetation will be allowed to create access to the island. The single retaining wall to be constructed on the mainland will be located landward of mangroves. Turbidity curtains will be used during construction to minimize short term water quality impacts. The modified project requires turbidity screens to be installed if there is any indication of sedimentation. No mechanical equipment will be located on the island during construction. No boats will be moored at the site of the modified project. The modified project will cause no significant downstream shoaling or silting. The site of the modified project is located approximately 15 feet from an existing fishing platform. No significant shoaling has been associated with that platform. The impacts associated with the modified project are similar to the impacts associated with single family docks in the area. No significant shoaling has been associated with such docks. The modified project is not a navigational hazard. The elevation is sufficient to accommodate small boats, canoes, and row boats. Reflective devices are required to alert night boat traffic of its presence. There is adequate clearance under the bridge to prevent obstruction. DER reviewed all applicable rules and criteria in considering the modified project. The modified project will have no adverse effect upon public health, safety or welfare, or the property of others. The modified project will not adversely impact the conservation of fish, wildlife, or their habitats. The modified project will not adversely affect navigation, the flow of water, or cause harmful erosion or shoaling. The modified project will not adversely impact fishing value or marine productivity in the area. The modified project will have no adverse impact upon recreational values in the vicinity. The modified project was reviewed in a manner that is customary for similar projects reviewed by DER. It is common practice for DER employees, as they did in this case, to rely upon opinions of other DER professionals in formulating an intent to issue. Other projects within DER jurisdiction in the general geographic area of the modified project and within the same region were considered in DER's review process. Other docks and marinas have been constructed and are proposed for construction within the South Fork of the St. Lucie River. Bridges including pedestrian bridges have been and are proposed to be constructed in Martin County. DER did not require a hydrographic study because the modified project was considered a minor project. DER review took into account the intended future use of the island property and DER's past experience with Respondent, Burke. As part of its review, DER reviewed a conceptual bridge to a single family residence on the island which would not require any fill or construction of retaining walls. In addition, DER considered previous violations on the island under Florida Administrative Code Rules 17-4.070, 17-4.160, and 17-4.530 in connection with an earlier permit that expired before the initial project was begun. Respondent, Burke, provided reasonable assurances that he is the owner of the site of the proposed project. Respondent, Burke, signed DER's property ownership affidavit and submitted a survey. DER's Intent to Issue does not authorize any construction in any area within the jurisdiction of DER other than the modified project. The Intent to Issue constitutes compliance with state water quality standards. DER has not received any requests for a jurisdictional determination in the general geographic area of the modified project. No enforcement action has been initiated by DER or at the request of a third party against Respondent, Burke, for alleged violations of DER rules.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Environmental Regulation enter a Final Order on the merits issuing the requested permit and awarding reasonable attorney's fees and costs in accordance with this Recommended Order. DONE AND ORDERED in Tallahassee, Leon County, Florida, this 4th day of April, 1990. DANIEL MANRY Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 4th day of April, 1990. APPENDIX Petitioner has submitted proposed findings of fact. It has been noted below which proposed findings of fact have been generally accepted and the paragraph number(s) in the Recommended Order where they have been accepted, if any. Those proposed findings of fact which have been rejected and the reason for their rejection have also been noted. Although most of Petitioner's proposed findings were cast in the form of "fact", they were in substance argument and rejected accordingly. The Petitioner's Proposed Findings of Fact Proposed Finding Paragraph Number in Recommended Order of Fact Number of Acceptance or Reason for Rejection 1 Included in part in Finding 1 Findings as to ownership are rejected as beyond the jurisdiction of the undersigned. Finding as to the late filed exhibit is rejected as irrelevant. 2-4, 10-12, Rejected as either irrelevant 16, or not supported by the record. 5 and 6, 37, 40 Rejected as unsupported by 42 the record. 7, 8, 15 Rejected as irrelevant 17, 21-29 and immaterial 9, 13, 14, 18-20 Rejected as immaterial 30-33, 35 and 36 37(a), 38, 39, 41, 48 20(A) Rejected as irrelevant and immaterial except the last sentence is included in Finding 13 34 Included in Finding 12 Rejected as not supported by the record, hypothetical and immaterial. Rejected as not established by clear and convincing evidence. Respondent, Burke, has submitted proposed findings of fact. It has been noted below which proposed findings of fact have been generally accepted and the paragraph number(s) in the Recommended Order where they have been accepted, if any. Those proposed findings of fact which have been rejected and the reason for their rejection have also been noted. Respondent. Burke's, Proposed Findings of Fact Proposed Finding Paragraph Number in Recommended Order of Fact Number of Acceptance or Reason for Rejection 15 and 16 Included in Finding 1 17, 26, 27 Included in Finding 2 18, 48 Included in Findings 15 and 16 19, 30, 31, 42 Included in Finding 13 20, 21, 44 Included in Findings 4 and 14 22, 23, 25, 32 Included in Finding 17 24 Included in Finding 16 25, 36-38 Included in Finding 17 Included in Finding 18 Included in Finding 3 Included in Finding 10 Included in Finding 19 35, 39, 43 Included in Finding 20 40, 41 Included in Finding 11 45-47 and 49 Included in Finding 16 51 and 52 Included in Findings 6-8 54 Included in Finding 5 and 8 50 and 53 Rejected as irrelevant and immaterial Respondent, DER, has submitted proposed findings of fact. It has been noted below which proposed findings of fact have been generally accepted and the paragraph number(s) in the Recommended Order where they have been accepted, if any. Those proposed findings of fact which have been rejected and the reason for their rejection have also been noted. The Petitioner's Proposed Findings of Fact Proposed Finding Paragraph Number in Recommended Order of Fact Number of Acceptance or Reason for Rejection 1 and 2 Included in Findings 1 and 2 3 Included in Finding 10 4 and 5 Included in Finding 16 6, 9 Included in Finding 2 7 and 8 Included in Findings 9 and 11 10 Included in Finding 13 11 Included in Finding 15 Included in Finding 17 and 14 Included in Finding 16 COPIES FURNISHED: Dale H. Twachtmann, Secretary Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, FL 32399-2400 Daniel H. Thompson General Counsel Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, FL 32399-2400 Patricia E. Comer Assistant General Counsel Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, FL 32399-2400 Patricia V. Bartell Qualified Representative 615 S.W. St. Lucie Street Stuart, FL 34997 J. A. Jurgens Jones, Foster, Johnson & Stubbs, P.A. 505 South Flagler Drive West Palm Beach, FL 33402

Florida Laws (3) 120.57120.69403.0876
# 2
ARCHIPELAGO COMMUNITY ASSOC., INC. vs DUANE RAAB AND DEPARTMENT OF ENVIRONMENTAL PROTECTION, 98-002430 (1998)
Division of Administrative Hearings, Florida Filed:Stuart, Florida May 28, 1998 Number: 98-002430 Latest Update: Apr. 17, 2000

The Issue Whether the finger pier portion of Respondent Raab's dock creates a navigational hazard. The resolution of that issue will determine whether the dock qualifies for an exemption from an environmental resource permit under Rule 40E-4.051(3)(b), Florida Administrative Code, and Section 403.813, Florida Statutes.

Findings Of Fact DEP has the authority to regulate the construction of docks in jurisdictional wetlands and other waters of the State of Florida and on state submerged lands under Chapters 253, 373, and 403, Florida Statutes, and Chapters 62-330 (which adopts Chapter 40E-4) and 18-21, Florida Administrative Code. The Association is a residential community located in Sewall's Point, Martin County, Florida. All lots within the community abut navigable channels which provide ingress and egress to the ICW. These channels converge so that there is only one channel that connects to the ICW. Most of the residents of the community have large vessels that routinely navigate the channels within the community. At the time of the formal hearing, many of the vessels owned by residents of the community had drafts of four feet and at least two had drafts of five feet. In 1997, Mr. Raab purchased a residence in the Association that is located very close to where the channel meets the ICW. Because of that location, practically all residents of the Association have to pass in front of Mr. Raab's property when going into or returning from the ICW. The property at issue is located at 22 Simara Street, Sewalls Point, Martin County, Florida. The dock at issue in this proceeding is subject to DEP's regulatory authority. When Mr. Raab purchased this property in 1997, there was an existing marginal dock parallel to the bulk-head. Mr. Raab subsequently sought and received approval from DEP to demolish the existing marginal dock and replace it with a virtually identical structure. The existence and configuration of the marginal dock is not at issue in this proceeding. Mr. Raab thereafter sought to modify his approved marginal dock by adding a finger pier which extended into the channel 36 feet so he could dock his vessel perpendicular to the bulkhead. Mr. Raab's plan also called for the construction of two pilings 12 feet from the end of the finger pier. Mr. Raab had, as of the time of the formal hearing, re-constructed the marginal dock and had constructed the finger pier. 3/ The two additional pilings had not been constructed at the time of the formal hearing. After reviewing the modified project, DEP determined that the project was exempt from the need for an environmental resource permit under Rule 40E-4.051(3)(b), Florida Administrative Code, and Section 403.813, Florida Statutes. DEP also authorized Mr. Raab to use state-owned submerged lands if necessary. The Association thereafter timely challenged DEP's determination that the finger pier portion of the project (and the two additional pilings) did not require an environmental resource permit. There was a conflict in the evidence as to the functional width of the channel in front of Mr. Raab's property. 4/ Mr. Holly testified on behalf of the Association that the functional width of the channel was 83 feet. Mr. Lidberg, testifying on behalf of Mr. Raab, testified that the functional width was 101 feet. This conflict is resolved by finding that the functional width of the channel in front of the Raab property is 101 feet. 5/ The prevailing winds in the area in front of Mr. Raabb's dock blow into the dock. The depth of the water in the channels is influenced by tides. The principal reason Mr. Raab wants the finger pier is so that he can moor his boat with the bow to the prevailing winds in times of high winds. At the time of the formal hearing, Mr. Raab owned a vessel with an overall length of 44 feet. There was a conflict in the evidence as to whether Mr. Raab's finger pier and the two pilings that have been authorized, but not constructed, constitute a hazard to navigation. 6/ Based on the totality of the evidence, it is found that these structures do not create a navigational hazard. 7/

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that DEP enter a final order dismissing the Association's challenge to the determination that Mr. Raab's project qualifies for an exemption from an environmental resource permit. DONE AND ENTERED this 1st day of March, 2000, in Tallahassee, Leon County, Florida. CLAUDE B. ARRINGTON Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 1st day of March, 2000.

Florida Laws (3) 120.57373.414403.813 Florida Administrative Code (1) 40E-4.051
# 3
JOHN K. AND PATRICIA S. HOLZBAUER vs. DEPARTMENT OF ENVIRONMENTAL REGULATION, 82-001947 (1982)
Division of Administrative Hearings, Florida Number: 82-001947 Latest Update: Jan. 30, 1984

The Issue Whether petitioners have timely availed themselves of a clear point of entry into administrative proceedings on Mr. and Mrs. Rankin's application for a permit to build a dock and, if so, whether the permit application should be granted?

Findings Of Fact On April 12, 1982, Frederick W. Rankin applied for a dredge and fill permit to construct a dock six feet wide and 300 feet long in the waters of Bayou Chico in Escambia County, Florida. Paralleling the dock on either side of the outboard end, two rows of mooring pilings 19.5 feet distance from the dock were proposed in the application. On April 20, 1983, Mark N. Snowdon, an employee of the Department of Environmental Regulation (DER) inspected the site, and, in an official DER permit application appraisal dated April 23, 1982, reported: Two large support vessels (crew boats) are moored at a small pier immediately east of the site. A commercial marina facility i[s] located directly across the bayou (north) from the project site. Bayou Chico is approximately 0.25 mile wide at this point. DER Exhibit No. 4. Between the crew boats' dock (Gulfwater Marine) and the site proposed for the Rankins' dock is the mouth of a small embayment (the bayouette). The Holzbauers own a house and lot, separated from the Rankins' lot by a parcel less than 75 feet wide, that fronts on the bayouette. PERMIT ISSUES DER issued a permit on June 9, 1982, and work began on the Rankins' dock on June 12, 1982. On the same day, Mr. Holzbauer inquired of the men putting in pilings whether DER had issued a permit for the work, then telephoned DER and asked DER's Mr. Fancher the same question. Mr. Fancher told Mr. Holzbauer that a permit had been issued, which was the first Mr. Holzbauer was told of issuance of the permit. As far as the evidence revealed, no notice of intent to issue preceded issuance of the permit. On June 26, 1982, the Holzbauers received a letter from W. Richard Fancher on behalf of DER, dated June 24, 1982, in which he stated: It is my understanding that, until recently, you had no knowledge of this private dock project. If this is correct, you may consider this formal notice of the activity. Should you object to this permit, including any and all of the conditions contained therein, you may file an appropriate petition for administrative hearing. This petition must be filed within 14 days of the receipt of this letter. Further, the petition must conform to the requirements of Part III, Chapter 17-1 and Section 28-5.201, Florida Administrative Code (copies enclosed). The petition must be filed with the Office of General Counsel, Department of Environmental Regulation, Twin Towers Office Building, 2600 Blair Stone Road, Tallahassee, Florida 32301. If no petition is filed within the prescribed time, you will be deemed to have waived your right to request an administrative hearing on this matter. DER Exhibit No. 1. A copy of Mr. Fancher's letter to the Holzbauers was also sent to Mr. Rankin. On July 8, 1982, a letter from the Holzbauers to Ms. Tschinkel reached DER's Office of the Secretary, protesting issuance of the permit and alleging that the dock did not conform to permit conditions. 1/ This letter was referred to the Division of Administrative Hearings, whose Director entered an order, sua sponte, on July 28, 1982, that "[t]his matter is dismissed without prejudice." No. 82-1947. An amended petition dated August 4, 1982, reached DER's Office of the Secretary on August 9, 1982, and the Division of Administrative Hearings on August 20, 1982. No. 82-2314. NO PERMIT RELIANCE The dock has been continued to completion, at a cost of $11,000.00. As built, the dock veers out from shore at a more easterly angle than the permit purported to allow. Whereas the permit contemplated construction at an angle several degrees west of north, the dock has in fact been built at an angle about 15 degrees east of north. One result is that the end is some 90 feet east of the point contemplated by the permit. Although a DER employee testified that this deviation was "within reason," it is clearly a significant departure from what the permit putatively allowed. The Rankins only own 86 feet of bayou frontage. The mouth of the bayouette is no more than 110 feet across. The mooring pilings, moreover, have been set in two rows parallel to the dock not 19.5 feet on either side, but 40 feet from the west side of the dock and 30 feet from the east side. If any of the landowners on the bayouette (with one exception) tried to build a pier perpendicular to their shore line extending even half the length of the Rankins' dock, it would intersect the Rankins' dock. NAVIGATION While the dock does not seal off the bayouette, it makes access considerably more difficult, especially for Mr. Holzbauer who sails in and out in his 14 foot boat. The dock juts out from the point at the western edge of the entrance into the bayouette at such an angle that it comes within 70 feet of the eastern edge of the entrance into the bayouette. Petitioner's Exhibit No. The crew boats moored to the east of the Rankins' dock have overall lengths ranging from 65 to 85 feet and there were three of them moored at Gulfwater Marine last summer. When the crew boats are docked, the distance between the westernmost one and the most inboard mooring piling next to the Rankins' dock is 81.5 to 103 feet. Where traffic from Bayou Chico to Pensacola Bay passes under a bridge, the channel is only 80 feet wide and the crew boats sometimes hit the bridge. The greatest problem the Rankins' dock has caused the crew boats is making docking more difficult. It is not always easy to turn an 85 foot boat around in the wind. The root of the problem, according to Mr. Kingry, who owns the crew boats, is that a patch of slightly deeper water in this generally shoaled area has been cut or blocked by the Rankins' dock. Sooner or later, Mr. Kingry predicted, a crew boat will "wipe out" the Rankins' mooring pilings.

Recommendation Upon consideration of the foregoing, it is RECOMMENDED: That the Department of Environmental Regulation deny the application for a dredge and fill permit for a dock located and aligned as this dock is. DONE and ENTERED this 27th day of April, 1983, in Tallahassee, Florida. ROBERT T. BENTON, II Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 27th day of April, 1983.

Florida Laws (1) 120.57
# 4
HIGHWAY 60 AND 301 CENTER, INC. vs BIG BEND CENTER, LLC, ENTERPRISE HOLDINGS, INC., AND SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT, 12-002021 (2012)
Division of Administrative Hearings, Florida Filed:Tampa, Florida Jun. 11, 2012 Number: 12-002021 Latest Update: Apr. 11, 2013

The Issue The issues to be determined in this case are whether Petitioner Highway 60 and 301 Center, Inc., has standing to challenge the proposed Environmental Resource Permit issued to Respondent Big Bend Center, LLC, by Respondent Southwest Florida Water Management District ("District"), and, if so, whether Big Bend Center is entitled to issuance of the proposed permit.

Findings Of Fact The Parties Petitioner owns real property located at 105 U.S. Highway 301 South, in Tampa, which Petitioner leases to commercial businesses. Respondent Big Bend Center owns real property located at 110 U.S. Highway 301 South, which is across Highway 301 from Petitioner's property. Big Bend Center is named in the District's agency action and is the permittee. The site affected by the proposed permit modification is about 2.5 acres in size. It is part of a larger development owned by Big Bend Center, encompassing about 30 acres. The 30-acre site was the subject of a permit issued by the District in 1988. The 1988 permit approved a master drainage plan applicable to all 30 acres. The permit modifications discussed herein are modifications to this initial permit. Respondent Enterprise Holdings leases the 2.5-acre site at 110 U.S. Highway 301 South, which Enterprise uses for the operation of a car and truck rental business. When Petitioner filed its petition with the District, it named Enterprise Holdings, Inc., as a Respondent, even though Enterprise Holdings was not named in the permit. Neither Petitioner nor the District ever questioned the right of Enterprise Holdings to participate as a party. Respondent Southwest Florida Water Management District is the administrative agency charged with the responsibility to administer and enforce chapter 373, Florida Statutes, and the rules promulgated pursuant thereto in Florida Administrative Code Chapter 40D. The Permit The petition for hearing challenged the District's approval of a proposed permit designated 44003983.007. The permit authorized the construction of a building over existing pavement and the addition of a dumpster pad. After the petition for hearing was filed, Big Bend Center requested and the District approved a modification, designated .008, which included the .007 changes and, in addition, authorized the construction of a section of sidewalk and landscape islands in the parking lot. Enterprise then requested and the District approved another modification, .009, which authorized all the changes addressed in .008 and, in addition, authorized changes to the paved parking lot. Standing Petitioner contends that proposed permit, modification .009, would injure Petitioner because the authorized changes would result in flooding of Highway 301 that could reach Petitioner's property or, even if it did not reach that far, would interfere with traffic on Highway 301 in a manner that would disrupt Petitioner's business. The sole factual allegation upon which Petitioner bases its claim of flooding is that the previously-installed pipes that convey runoff to a retention pond may be too small; smaller than was required by Big Bend Center's 1988 permit. Petitioner's expert, Clifford Laubstein, stated that a boundary survey in the permit file shows two 18-inch diameter pipes connected to a 24-inch diameter pipe. Big Bend Center's 1988 permit required these pipes to be 24 inches and 30 inches, respectively. Laubstein admitted that the "as built" construction drawings that were submitted to the District by Big Bend Center after the construction of the master drainage system certifies that the pipes are the required, larger size. Laubstein did not have firsthand knowledge of the size of the pipes. He did not know which document was correct, the survey or the as built drawings. His position was simply that if the survey information was correct, Big Bend Center's stormwater system would fail to function properly and flooding could occur. Laubstein did not know whether the system had failed to function properly in the past or had ever caused flooding. Laubstein did not determine what storm event or volume of runoff would result in flooding of Highway 301, or the extent of flooding that would occur under various storm events. Because as built constructions drawings are prepared by an engineer and submitted to the District for the very purpose of certifying that a system has been constructed in accordance with the requirements of the permit, information in the as built drawings about components of the system would generally be more reliable than such information in a survey that was prepared for another purpose. Furthermore, Enterprise's expert witness, Steve Boggs, measured the pipes and determined they were 24 and 30 inches, as required by the permit. By refuting Petitioner's claim that the pipes "may" be undersized, Respondents refuted Petitioner's claim that Highway 301 or Petitioner's property "may" be flooded if the proposed permit modification is issued by the District. The stormwater system for the proposed project is properly sized to handle the stormwater runoff. Petitioner failed to meet its burden to prove by a preponderance of the evidence that it could be injured by the proposed permit modification.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the District dismiss the petition and issue Environmental Resource Permit 44003983.009. DONE AND ENTERED this 4th day of March, 2013, in Tallahassee, Leon County, Florida. S BRAM D. E. CANTER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 4th day of March, 2013.

Florida Laws (4) 120.569120.57120.60373.4141
# 5
GLORIA S. ELDER vs CARGILL FERTILIZER, INC.; FORT MEADE MINE; AND SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT, 92-006215 (1992)
Division of Administrative Hearings, Florida Filed:Bartow, Florida Oct. 16, 1992 Number: 92-006215 Latest Update: Jul. 22, 1993

Findings Of Fact At all times pertinent to the issues herein, Respondent, Cargill, a Delaware corporation authorized to do business in Florida which owned and operated a phosphate mine near Fort Meade, located in Polk County Florida. Petitioner, Gloria Elder, owns residential property adjoining the Fort Meade Mine on which she maintains an individual water well for domestic and other purposes. The Respondent, District, has the responsibility for regulating the consumption and conservation of ground and surface water within its jurisdictional limits, including the well in question. For a period prior to December, 1990, Cargill had been operating under consumptive use permit No. 202297.04, issued by the District, which provided for average daily withdrawals of 12.0 MGD from wells on its property. In addition to the 12.0 MGD, Cargill also was utilizing an additional 3.3 MGD for mine pit and surficial aquifer dewatering activities which did not have to be reflected in the permit but which were lawful uses. In December, 1990, Cargill submitted its application to renew the existing water use permit with a modification including the 3.3 MGD previously being used but not officially permitted. No additional water would be drawn from the permitted wells as the newly applied for 15.3 MGD was the total of the 12 MGD and 3.3 MGD previously permitted and lawfully used. After reviewing the additional information requested of Cargill pertaining to this application, the District published its Notice of Proposed Agency Action for approval of the permit. The proposed permit authorizes withdrawal of the amount requested in the application, 15.3 MGD, the exact same amount actually withdrawn under the prior permit. As a part of the proposed permit the District imposed two special conditions. These conditions, 12 and 13, require Cargill to conduct its dewatering activities no closer than 1,500 feet to any property boundary, wetlands, or water body that will not be mined or, in the alternative, to mitigate pursuant to conditions 12 and 13 any activities conducted within the 1,500 foot setback. There are no reasonable alternatives to Cargill's request. The mining process in use here utilizes a water wash of gravel-size phosphate ore particles out of accompanying sand and clay. The water used for this purpose is recycled and returned to the washer for reuse. The resulting phosphate ore mix, matrix, is transported with water in slurry form to the refining plant. This system in the standard for phosphate mining in the United States. Once at the plant, the slurry is passed through an amine flotation process where the sand and phosphates are separated. This process requires clean water with a constant Ph balance and temperature which can be retrieved only from deep wells. Even though the permit applied for here calls for an average daily withdrawal of 15.3 MGD, typically the Cargill operation requires about 10.08 MGD from deep wells. This is a relatively standard figure within the industry. Approximately 92 percent of the water used at the site in issue is recycled. However, recycled water is not an acceptable substitute for deep well water because it contains matters which interfere with the ability of the chemical reagents utilized in the process to react with the phosphate rock. Therefore, the quantity sought is necessary and will support a reasonable, complete mining operation at the site. The Cargill operation is accompanied by a strenuous reclamation operation. Land previously mined near the Petitioner's property has been reclaimed, contoured, re-grassed and re-vegetated. This project was completed in 1990. No evidence was introduced showing that Cargill's operation had any adverse effect on the Elders' well. Water samples were taken from that well at the Petitioner's request in May, 1991 in conjunction with the investigation into a previous, unrelated complaint. These samples were submitted to an independent laboratory for analysis which clearly demonstrated that the minerals and other compounds in the water from the Petitioner's well were in amounts well below the detection level for each. Only the iron level appeared elevated, and this might be the result of deterioration of the 18 year old black iron pipe casing in the well. Another possible explanation is the fact that iron is a common compound in that part of the state. In any case, the installation of a water softener would remove the iron, and there is no indication the water would have any unacceptable ecological or environmental impacts in the area either on or off the site. No other residents in the area have complained of water quality problems. Petitioner claims not only that Cargill's operation would demean her water quality but also that its withdrawal will cause a draw down in the water level in her well. This second matter was tested by the District using the McDonald-Haurbaugh MODFLOW model which is well recognized and accepted within the groundwater community. The model was applied to the surficial, intermediate, and upper Floridan aquifers and indicated the draw down at the property boundary would be less than one foot in the surficial aquifer and less than four feet in the intermediate aquifer. The model also showed the draw down at the Petitioner's well would be less than three feet, which is well within the five foot criteria for issuance of a consumptive use permit under the appropriate District rules. This evidence was not contradicted by any evidence of record by Petitioner. All indications are that the water use proposed is both reasonable and beneficial, is consistent with the public interest, and will not interfere with any existing legal use of water.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is, therefore recommended that WUP Permit No. 202297.05 be renewed as modified to reflect approval of 15.3 MGD average daily withdrawal. Jurisdiction will remain with the Hearing Officer for the limited purpose of evaluating the propriety of an assessment of attorney's fees and costs against the Petitioner and the amount thereof. RECOMMENDED this 29th day of April, 1993, in Tallahassee, Florida. ARNOLD H. POLLOCK Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 29th day of April, 1993. COPIES FURNISHED: Joseph N. Baron, Esquire 3375-A U.S. Highway 98 South Lakeland, Florida 33803 Rory C. Ryan, Esquire 200 South Orange Avenue Suite 2600 Post office Box 1526 Orlando, Florida 32801 Martin D. Hernandez, Esquire Richard Tschantz, Esquire 2379 Broad Street Brooksville, Florida 34609 Peter G. Hubbell Executive Director Southwest Florida Water Management District 2379 Broad Street Brooksville, Florida 34609-6899

Florida Laws (3) 120.57120.68373.223 Florida Administrative Code (1) 40D-2.301
# 6
ST. TERESA DOCK ASSOCIATION, INC., AND H. S. OVEN vs. DEPARTMENT OF ENVIRONMENTAL REGULATION, 78-002246 (1978)
Division of Administrative Hearings, Florida Number: 78-002246 Latest Update: Jan. 07, 1980

The Issue Whether Bay North Corporation should be issued a permit to construct a domestic wastewater treatment and disposal system at Camp Weed, Franklin County, Florida, pursuant to Chapter 403, Florida Statutes.

Findings Of Fact On February 27, 1978, Lomax Smith, a builder and developer in Tallahassee, Florida, entered into an agreement with the Protestant Episcopal Church in the Diocese of Florida to purchase some 42 acres of real property and the improvements thereon known as "Camp Weed" which is located in Franklin County, Florida. The purchase price of the property was $725,000, with an earnest money deposit of $20,000, and closing of the transaction to be on or before July 1, 1978. At the time of purchase, eight dormitory and several accessory buildings were located on the property which utilized septic tanks for sewage disposal. An existing deep well is in the northwest portion of the property for a water supply. Smith proposed to develop the property by the sale of lots, remodel some of the existing buildings, and construct new housing units. He employed the engineering firm of Broward Davis and Associates, Inc., Tallahassee, Florida, to prepare the necessary design plans and a state environmental permit application for a proposed domestic wastewater treatment plant to be located on the site. (Testimony of L. Smith, N. Smith, Exhibits 12, 13) On September 6, 1978, Smith filed an application with Respondent Department of Environmental Regulation (DER) for a permit to construct the sewage treatment plant (STP) at Camp Weed. He signed the application as owner of the property although he had not closed the purchase transaction nor acquired legal title at that time. The application and supporting plans were reviewed in the Northwest District Office of the Department of Environmental Regulation after site investigation, and it was determined that construction of the facility would be in accordance with applicable laws and regulations. A construction permit was issued to Smith for the STP on October 10, 1978, subject to certain specified conditions attached to the permit. Notification of the permit issuance was not preceded by a notice of intent to grant the permit, nor were any third parties advised of its issuance. Petitioners St. Teresa Dock Association, Inc. (then St. Teresa Dock Association) and H.S. Oven first learned of the permit issuance when their counsel was informed by Smith's counsel on November 3, 1978, that the permit had been issued. Petitioners thereafter on November 17 filed a petition for hearing with DER. (Testimony of L. Smith, Huff, Exhibits 1, 4-5, 8) Camp Weed is bounded on the north by U.S. Highway 98 and on the south by the Gulf of Mexico. The planned site for the STP is in the northeast corner of the tract which is some twelve feet above mean sea level and approximately 950 feet from the shoreline. The elevation of the property on the northwestern side is about 24 feet and is five feet in the middle. The land slopes generally toward the middle area and drains in a southerly direction to the gulf. The subdivision of St. Teresa where Petitioners' members own summer homes is located immediately west of Camp Weed. The members of the St. Teresa Dock Association, Inc., and Petitioner Hamilton S. Oven use the beach and gulf waters for boating, fishing, and other recreational purposes. About a dozen shallow wells in the St. Teresa subdivision provide drinking water for the residents. They are located over 1700 feet southwest from the site of the proposed STP. There are two ponds north of the St. Teresa area adjacent to U.S. Highway 98. An artesian well is located in the gulf about 25 feet south of the Camp Weed property. (Testimony of Huff, N. Smith, Oven, Sensabaugh, Exhibits 2,7, 9-11, 22, 24) The proposed plant is designed to provide sewage treatment for 132 housing units containing an estimated population of 3 persons per unit. A gravity flow collection system to a pumping station will produce a peak influent rate of 29,700 gallons per day with an estimated biological oxygen demand (BOD) loading of 49.6 pounds per day. A basket strainer on the influent line will remove trash. Plant operation will involve the use of aeration tanks, clarifier, chlorination, sand filter and clear well for discharge to a percolation pond. A polishing pond was originally planned, but was deleted at the suggestion of the DER because it performs the same function as the proposed sand filter. Two percolation ponds for alternate use will be construed so that the pond bottom is twelve feet above sea level. A soil test revealed that a sand layer extends under the shallow surface top soil to a depth of approximately 10 feet before reaching the shallow ground water table and that the effluent will percolate through the sand at the rate of one inch per minute. A five foot soil boring by DER failed to encounter ground water at that level and show that rate of percolation through the sand would be acceptable. The ground water table is subject to an unknown variance indepth during the wet and dry seasons of the year depending on the amount of rainfall. Although tide fluctuations may also have some effect on depth of the ground water table, the tide most likely will be of minimum influence due to the distance of the plant site from the gulf. Percolation of at least three feet through sand before reaching ground water is sufficient to meet DER policy requirements. (Testimony of Huff, N. Smith, Bishop, Exhibits 1, 3, 16-17). Based on the design of the STP, it is predicted by applicant's design engineer that there will be at least 90 percent removal of pollutants after chlorination and prior to passage of the effluent through the sand filter. The engineer predicts that after such filtration, there will be approximately 95 percent removal prior to percolation and that the effluent will then be pure enough to use as drinking water. Further purification will take place during the percolation process. The DER District Supervisor of Domestic Wastewater Permitting, who also is a professional engineer, substantially agrees with those predictions. Actual results of the treatment process can be determined, however, only after tests from monitoring wells are made during actual trial operations of the plant. It is further agreed by those experts that the average chlorine residual content in the effluent will be 0.5 parts per million. The DER supervisor therefore is of the opinion that, if the STP is properly operated, the processed effluent will not degrade ground waters, not adversely affect the wells in the St. Teresa Community or the waters of the gulf. After percolation, there is further dilution and ultimately the ground water which reaches the gulf in eight to ten days will be in a purer form than prior to introduction of the effluent. Although a twenty-year storm criterion was applied in the design of the percolation ponds, a catastrophic storm such as a hurricane was not taken into consideration since it would not be economically feasible to design for such an effect and, in any event, super dilution caused by such a storm would negate the possibility of water quality degradation. (Testimony of Huff, N. Smith, Exhibit 1) The buildup of sludge in the plant's holding tank will require removal about once a year when the plant is in full operation. The applicant will employ a certified individual to operate the plant and to remove sludge periodically to an appropriate place for disposal in an authorized manner. DER regards sludge disposal to be a matter for determination at the time application is made for an operating permit. (Testimony of Huff, L. Smith, McNeill, N. Smith, Exhibit 1) The applicant estimates that the construction of the plant and collection system will cost approximately $1,000 per housing unit for a total of $132,000. It is planned to recover this cost on the sale of lots. A condition of such purchases will be that the sewage system and treatment plant will be operated by a home owners association which is to be activated in the near future. Maintenance cost of the sewage plant will be shared by the individual members. Approximately twenty or twenty-five members are required for economical operation of the plant. (Testimony of N. Smith, L. Smith) The county zoning classification for the Camp Weed area is currently the subject of litigation by the applicant in the Franklin County Circuit Court and the result of that litigation as to permitted density of housing will determine the amount of units to be constructed by the applicant. In any event, if the applicant does not secure a county building permit, any DER construction permit would expire at the termination of the time granted therefor. (Testimony of L. Smith, Huff, Exhibit 24) At the time Intervenor Lomax Smith signed the permit application, Bay North Corporation had not been formed. It was incorporated in November, 1978, in order that Smith could obtain financing to complete the property purchase. The transaction was closed November 6, 1978, and a warranty deed to the property was issued to Bay North Corporation by the Episcopal Church in the Diocese of Florida, Inc. The deed was recorded in the public records of Franklin County on November 7, 1978. Lomax Smith is the president and principal stockholder of Bay North Corporation. Promissory notes secured by mortgages to the Southern Bank of Tallahassee and the Episcopal Diocese of Florida in the amounts of $350,000 and $362,500 respectively, were executed by Bay North Corporation on the same date. Pursuant to a request to DER from Lomax Smith on May 15, 1979, the Northwest District DER Office, on June 29, 1979, purported to transfer the permit to Bay North Corporation and extend the expiration date to September 30, 1980. (Testimony of L. Smith, Huff, Exhibits 6, 14-15, 21) The construction permit issued in October, 1978, was subject to standard and special conditions, including the requirement that the permit holder comply with county and municipal regulations prior to construction. They provided that monthly reports be furnished to the DER prior to issuance of an operation permit setting forth wastewater characteristics during a trial period of plant operation. They also required that the facility meet the treatment requirements contained in Chapter 17-3, F.A.C., including a 90 percent reduction in BOD and suspended solids based on concentration of the influent entering the plant. The conditions further provide that at the time of application for an operation permit, it must be shown that a certified operator under Chapter 17- 16, F.A.C., is retained, together with a copy of any contract for contract operation of the facility. Additionally, the conditions require that two monitoring wells be established upstream and downstream of the ponds and that quarterly ground water samples be analyzed and reported to DER. A further condition provides that a three-foot buffer zone must be maintained between the bottom of the percolation ponds and the maximum elevation of the ground water. (Exhibit 8)

Recommendation That the Department of Environmental Regulation issue the requested permit to Bay North Corporation, subject to the conditions attached to the permit issued on October 10, 1978. DONE AND ORDERED in Tallahassee, Leon County, Florida, this 21st day of November, 1979. THOMAS C. OLDHAM Hearing Officer Division of Administrative Hearings Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 COPIES FURNISHED: George E. Lewis, II, Esq. 316 East Park Avenue Tallahassee, FL 32303 William L. Hyde, Esq. Assistant General Counsel Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, FL 32301 Ben H. Wilkinson, Esq. Pennington, Wilkinson, Gary and Dunlap Post Office Box 3875 Tallahassee, FL 32303 Alfred O. Shuler, Esq. Post Office Box 850 Apalachicola, FL 32320

Florida Laws (1) 403.087
# 7
RICHARD L. BUCHANAN vs. DEPARTMENT OF ENVIRONMENTAL REGULATION, 82-003543 (1982)
Division of Administrative Hearings, Florida Number: 82-003543 Latest Update: Nov. 01, 1991

Findings Of Fact Petitioner Richard L. Buchanan owns a lot in Franklin County, which lies on the north shore of Apalachicola Bay. Shellfish harvesting is prohibited in the water adjacent to his parcel despite, or perhaps because of, oyster houses having operated in the vicinity for many years. Mr. Buchanan is not an oysterman himself, but he does fish commercially, when he is able. He owns two licensed fishing boats. He goes floundering and also fishes with gill nets. Since he acquired the property 10 or 12 years ago, Mr. Buchanan regularly loaded nets from shore and unloaded fish and nets on shore, until the prop-dredging took place, even though a dock extends out into the Bay from his property. The outboard motor is hard to handle from the dock and it is virtually impossible to load the nets from the dock without fouling them. Until the prop-dredging he could bring his boats all the way in and lay their bows on the shore along the stretch of clean sand 35 to 50 feet wide at the western end of his 145 feet of Bay frontage. There was a sheer drop to a depth, at high water, of about 3.5 feet. The Sadler boy drowned there. Before the prop-dredging disturbed it, the configuration of the bottom that allowed small boats to come all the way into shore at that point had obtained for decades. Leo Nixon Harwell, son of the former owner of petitioner's property, remembered running the Harwells' oyster boat, which drew three feet, right up on the beach. Mr. Harwell, who looked to be in his 50's, testified that there had been deep water next to the shore ever since he was "no yearly boy." The further from shore the deeper it got till you reached Two Mile Channel. Between the sandy beach and the channel there was no vegetation to speak of although there was a marshy swash to the east of the sandy beach. In 1979, when Arman Earl Cloud had to haul his bay shrimper for repairs, he floated it to the beach in back of Mr. Buchanan's house and pulled it up on the beach, using rollers. The bow floated to the water's edge. The boat had a length overall of 25 to 28 feet, a beam of nine feet and drew three to three and a half feet of water. An oyster house sits on the next parcel west of the Buchanan property. The oyster house belongs to a man named Page, and a dock 100 feet long juts out toward Two Mile Channel from the oyster house. It used to be impossible to get an oyster boat in any closer to shore. When John Paul Whitehead was oystering some years back, they used to have to anchor out and transfer the oysters to a skiff to get them to the Page oysterhouse. In fact, when Diane Collins rented the oysterhouse (from Bobby Youngblood) in 1974 or 1975 it was impossible to bring even a flat-bottomed boat in as far as the waterward end of the dock. "On dead low tide all you seen was sand on either side of the dock." According to unrebutted testimony, the Pages changed all this by prop- dredging. (Mr. Page failed to honor the subpoena requiring his attendance at the final hearing.) Prop-dredging involves fixing the bow of a boat by grounding or otherwise, and turning the propeller at speeds high enough to move soils on the bottom. Bay this technique, the Pages dredged great quantities of sand on either side of their dock. Most of the sand stayed suspended in the water only long enough to settle in front of their neighbors' property. This illegal activity was brought to the attention of the marine patrol at the time, whose warning to the Pages to desist went unheeded, and at least one employee of respondent Department of Environmental Regulation was also apprised. The prop- dredging continued for some time, usually at night, and the eventual result was "a muck hill" in front of the Miracle Seafood property abutting the Pages to the west, and a sandbar in front of Mr. Buchanan's property that completely blocks access to his sandy beach. The Pages, with 55 front feet on the Bay, can now accommodate quite a fleet at their dock. One day six to eight boats were docked there. The sandbar in front of Mr. Buchanan's property attributable to the Pages' unpermitted and illegal prop-dredging has by now been there long enough that smooth cord grass (Spartina altiflora), saw grass and maiden cane have taken root. The dredging proposed by petitioner to restore access to his shoreline would disturb some 400 square feet, on which only Spartina altiflora is growing. On about a quarter of the proposed site, there is no vegetation. The Spartina altif lora helps stabilize the shoreline, serves to filter pollutants running off into the Bay and provides a habitat and food for insects, worms, oysters, shrimp and fishes. Dredging would resuspend any heavy metals in the soil, and increase the turbidity of the water, in the immediate vicinity. There is a boat ramp 500 feet from petitioner's property. DER would issue a permit for a marine railway at the site where petitioner hopes to dredge. Apalachicola Bay is classified as Class II waters, and as outstanding Florida waters, being part of an aquatic preserve. There is a clear public interest in permitting a private citizen, who is willing to restore, at his own expense, a part of the coastline disturbed by illegal activity which he responded to the authorities at the time, to the status quo which existed for as long as anybody can remember, before the illegal activity disturbed it. In an undated letter to Mr. Buchanan, James W. MacFarland, Director, Division of State Lands, Department of Natural Resources, advised that Upon the assurance that the environmental effects are acceptable and with the understanding that DER intends to issue the permit, we will request the dredge material severance fees and issue our authorization pursuant to Section 253.77, Florida Statutes, upon the permit receipt. The credible testimony of DER staff was to the effect not that the loss of some 300 square feet of Spartina altif lora would have unacceptable environmental effects, but that the cumulative effect of projects entailing destruction of such grasses would have unacceptable environmental consequences. Respondent's proposed findings of fact, conclusions of law and proposed recommended order have largely been adopted, in substance. To the extent any proposed finding of fact has been rejected, it has been deemed immaterial or unsupported by the weight of the evidence.

Recommendation Upon consideration of the foregoing, it is RECOMMENDED: That petitioner grant respondent's application for a dredging permit on such reasonable conditions, including turbidity curtains, as are necessary adequately to protect the project vicinity. DONE and ENTERED this 8th day of August, 1983, in Tallahassee, Florida. ROBERT T. BENTON, II Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 8th day of August, 1983. COPIES FURNISHED: E. Gary Early, Esquire Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32301 Richard L. Buchanan P. O. Box 33 Apalachicola, Florida 32320 Victoria Tschinkel, Secretary Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32301

Florida Laws (1) 253.77
# 8
ALICO WEST FUND, LLC vs MIROMAR LAKES, LLC, AND SOUTH FLORIDA WATER MANAGEMENT DISTRICT, 15-000572 (2015)
Division of Administrative Hearings, Florida Filed:Fort Myers, Florida Feb. 03, 2015 Number: 15-000572 Latest Update: Apr. 13, 2016

The Issue The issue is whether to approve an Environmental Resource Permit (ERP) modification for the construction of a surface water management system, to be issued to Respondent, Miromar Lakes, LLC (Miromar), which will serve a 29.08-acre single- family residential development known as The Peninsula Phase IV (Phase IV) located in Lee County, Florida.

Findings Of Fact The Parties Miromar is a Florida limited liability corporation that owns property in the Miromar Lakes community in Lee County on which a development known as Phase IV will be constructed. Miromar is the applicant for the Phase IV permit. The District is a government entity with the power and duty to exercise regulatory jurisdiction over the proposed project pursuant to part IV, chapter 373, Florida Statutes, and title 40E, Florida Administrative Code. In implementing this power and duty, the District has adopted the Applicant's Handbook (AH) to provide standards and guidance to applicants. Alico is a Florida limited liability corporation with its principal place of business in Fort Myers, Florida. It is the owner of property immediately adjacent to and north of Miromar's property. Respondents have stipulated to the facts necessary to establish Alico's standing. The Conceptual Permit This case concerns Miromar's application to modify a conceptual permit issued by the District more than 15 years ago. On June 10, 1999, the District issued ERP Permit No. 36-03568-P, a conceptual approval permit for the development of a large, mixed-use residential development with a golf course, known as Miromar Lakes, that lies east of Interstate 75 (I-75), south of Alico Road, and north of Florida Gulf Coast University. The permit also approved a surface water management system designed to serve a 1481.1-acre mixed-use development within Miromar Lakes. Alico asserts that the permit is so vague in future development details that it is impossible to determine whether Phase IV is consistent with its terms and conditions. However, the 1999 permit was not contested, and any attempt in this proceeding to challenge that permit, or subsequent modifications to the permit that are now final, is untimely. A conceptual permit is available to applicants who wish to have their design concept approved for a master plan or future plan. So long as the future phases are consistent with the conceptual permit and there are no changes to applicable state water quality standards or special basin criteria, the applicant does not need to reapply under the current rules for subsequent phases. Instead, it allows an applicant to take advantage of the rules in effect at the time of the original permit issuance. A conceptual permit typically leaves construction details to future development decisions. As District witness Waterhouse explained, this is "the nature of a conceptual permit." Because the landowner does not know the precise manner in which the property will be developed years down the road, "it doesn't make sense to force the landowner to pretend that they do because it's a pretty good bet that those things are going to change to some extent in the future." By way of example, Waterhouse noted that "[a]s long as it's single family proposed then and it's proposed now, I would characterize that as sufficient detail." It is not surprising, then, that the 1999 permit contains very little detail regarding the existence, location, or development of roads, lots, a stormwater management system, or grading, and that the construction permit for Phase IV has far more detail than the conceptual permit. Even Alico's expert agreed that there is no requirement that a conceptual permit include the details of each subsequent construction phase. A fair inference to draw is that the District intended for the developer to have considerable latitude in developing the large tract of undeveloped land, phase by phase, over the life of the conceptual permit. The 1999 permit has been modified over 60 times since its issuance, and to date, significant portions of Miromar Lakes have been constructed. Except for the current, on-going feud between Miromar and Alico over several recent or pending applications (see Case Nos. 15-1050, 15-3937, and 15-5621), none of these modifications were contested. The Property at Issue Phase IV is a 29.08-acre subdivision within an area of the Miromar Lakes community known as the Peninsula. Located within Basin 6, Phase IV is the last phase of development approved by the conceptual permit for residential development in the Peninsula. All prior Peninsula phases have been permitted and developed, or are in the process of development. Prior phases were permitted based on their consistency with the conceptual permit, and none were challenged by third parties. The area under Miromar's requested permit in the instant case was conceptually authorized for single-family residential development. This is confirmed by language in the 1999 permit, which describes the conceptual proposal for Basin 6 as "includ[ing] 639.7 acres of residential, golf course, and mixed-used [sic] development." Jt. Ex. 3, p. 275. The permit also provides that each of the four sub-basins in Basin 6 should "have a water quality structure that provides treatment for the first one inch of stormwater runoff from the sub-basin . . . and that attenuation for Basin 6 is achieved onsite via the proposed sub-basin lakes and also by an existing 244.2-acre borrow lake." Id. While the 1999 permit establishes standards for flood control elevations, minimum lot elevations, and discharge rates, more specific development guidance is not provided. When the conceptual permit was issued, Basin 6 contained one former mining pit dredged from uplands to be used as a man-made lake for recreational purposes. A second mining pit, later converted to a lake, continued mining operations until 2006. The following year, the District authorized the two borrow lakes to be connected by a series of channels and canals, forming a privately-owned, 660-acre waterbody now known as Lake 5/6. Alico's property includes Lake 5, which makes up the northern portion of Lake 5/6, while Lake 6 to the south, owned by the Miromar Lakes Community Development District, is surrounded by Miromar's development. Alico has an easement over portions of Lake 6 for recreational uses under a Lake Use Agreement. Because the two connected lakes are to be used only for recreation and attenuation purposes, Lake 5/6 is designated as Class III waters and cannot be used for stormwater treatment. It is not classified as an Outstanding Florida Water (OFW) or an Impaired Florida Waterbody. Lake 5/6 discharges over a control weir into an un- channeled slough system known as the Stewart Cypress Slough. The water travels several miles through the slough system, passes several intervening properties that also discharge waters into the slough, and then runs underneath I-75. It eventually reaches the Estero River, an OFW and Impaired Florida Waterbody, which flows into the Estero Bay, an OFW. There is no direct discharge of waters from Lake 5/6 to the Estero River. The evidence shows that the project will not increase the overall discharge rate from the control weir for Lake 5/6. In February 2013, the District approved another Miromar application, known as Phase III, which authorized the third phase of development within the same peninsula where the Phase IV project will be located. That development contains two wet detention structures (Lakes 1 and 3) that will also service the Phase IV project. The Phase III permit was issued using the 1999 rules and regulations and was not contested. The Application The Original Application On November 25, 2014, the District issued its notice of intent to issue Miromar a permit authorizing the construction and operation of a stormwater system serving 29.08 acres of residential development that included multi-family residences, single-family residences, 49 boat slips, and road construction. Phase IV is a very small portion of the 1,481-acre development approved in the conceptual permit. The project is located on Via Salerno Way and Via Cassina Court within Basin 6. Construction was originally proposed in Sub-Basins 1 and 3. There is an approved Master Plan for stormwater management facilities within the project area. The site was previously cleared and filled and no wetlands are located on the site. The original construction in Sub-Basin 1 consisted of a roadway, 22 single-family residential lots, and stormwater conveyance facilities. Also included were shoreline contour shaping, placement of rip-rap on portions of the Lake 5/6 shoreline to enhance stability, enhanced littoral zones, and boat docks. Stormwater within that Sub-Basin flows via sheet flow and interconnected inlets to the existing wet detention area (Lake 1) located in Phase III north of the site. The wet detention area provides the required water quality treatment volume for the project prior to discharge to Lake 5/6. The original proposed construction in Sub-Basin 3 consisted of a roadway, 11 single-family residential lots, and 16 multi-family buildings with associated internal roadway, parking areas, and stormwater treatment, storage, and conveyance facilities. Also included within the original plans were shoreline contour shaping, placement of rip-rap on portions of Lake 5/6 shoreline to enhance stability, enhanced littoral zones, and boat docks. Stormwater runoff within Sub-Basin 3 flows via sheet flow and interconnected inlets to the existing wet detention area (Lake 3) located in Phase III north of the site. The original application included a request to increase the surface area of Lake 3 by approximately 0.1 acre and to construct three dry detention areas within the multi-family development area. The wet and dry detention areas provide the required water quality treatment for the project prior to discharge to Lake 5/6. The Revised Project After the case was referred to DOAH, by letter dated June 8, 2015, Miromar's project engineer provided the District with proposed changes to the site plan, to be used at the final hearing then scheduled to begin on June 24, 2015, which include the replacement of 16 multi-family buildings and driveways on Via Cassina Court with 23 single-family residential lots; removal of the 16 multi-family boat docks located at the southern end of Via Cassina Court; reducing the number of boat docks to 45 single-family docks; relocation of the three dry detention areas shown on the proposed site plan; and clarification of the lot grading cross-section to ensure that stormwater runoff from the development will be directed to the stormwater management system and not Lake 5/6. Updated plans, drawings, and specifications, and new water quality calculations accompanied the letter and were intended to replace original Exhibits 2.0 and 2.3 of the permit. See Jt. Ex. JA-1, pp. 244- 257. The changes resulted in a continuance of the final hearing and Alico's filing of an Amended Petition. By amendment at final hearing, Miromar removed the 45 single-family docks. The June 8 letter states that the changes will not increase pollution or reduce the efficiency of the stormwater management system. Miromar acknowledges that some of these changes were to resolve concerns raised by Alico. Miromar now seeks approval of the Phase IV permit, incorporating the changes proposed by the June 8 letter and those agreed to at the final hearing. Because there was no requirement to provide a site- specific nutrient loading analysis when the 1999 permit was issued -- this analysis was not yet formally developed -- the District did not require, and Miromar did not submit, such an analysis with its application. Under the conceptual permit, Miromar was required to provide treatment for one inch of stormwater runoff in Basin 6. Relying on this condition, Miromar applied that treatment to the Phase IV permit. This results in the treatment of 7.09 acre- feet of stormwater for the basin. After the construction shown in the permit, the stormwater management system will treat 9.21 acre-feet, or more than is required under the 1999 permit. The District established that new flood routing calculations for the project were not necessary because Miromar has set elevations for the water control structures in Lakes 1 and 3 at the same level as the road elevations, and the project connects to an existing surface water treatment system. This provides reasonable assurance that the project will not cause flooding despite having no calculations from the applicant. Alico's Objections Although couched in different terms, Alico's concerns can be generally summarized as follows. First, it contends the application should be treated as a major modification of the conceptual permit and that Miromar must satisfy current rules and regulations, and not those in effect in 1999. Second, it contends both the original and revised applications are inconsistent with the conceptual permit and must be treated as a new design, subject to all current rules and regulations. Third, even though Miromar agreed at hearing to revise its permit to address certain errors/deficiencies identified by Alico's experts, Alico contends no revisions can be made at this stage of the proceeding, and that a new application must be filed with the District and the review process started anew. Is the Application a Major or Minor Modification? If the modification is minor, Miromar is required only to satisfy applicable rules for issuance of a permit when the conceptual permit was issued. Rule 62-330.315 and AH section 6.2.1 provide guidance in resolving this issue. Rule 62-330.315(2)(g) defines a minor modification as one "that do[es] not substantially alter the permit authorization, increase permitted off-site discharge, increase the environmental impact of the project, decrease required retention, decrease required detention, decrease required flood control elevations, or decrease pollution removal efficiency." The rule also provides that the "factors that will be considered in determining whether a change is minor are described in section 6.2.1 of Volume I [of the Applicant's Handbook]." Section 6.2.1(d) lists a series of 14 factors to be considered in determining whether a modification will cause more than minor changes under rule 62-330.315(2). None of the factors is dispositive alone, and the presence of any single one of the factors does not necessarily mean that a modification is major. All 14 factors are considered together in determining whether a modification is major. Using the factors set forth in rule 62-330.315(2), in conjunction with section 6.2.1, the District reviewed the application to determine whether it was a minor modification. Based on these criteria, the District determined that the application qualified as a minor modification of a conceptual permit and that it satisfied applicable rules for issuance of a permit for this subsequent phase of the project. Alico contends that the initial review by a District staffer was only cursory and was in no way a meaningful assessment. Even if this is true, subsequent reviews by District staff, including witness Waterhouse, who supervises the ERP Bureau, was a signatory on the 1999 permit, and has reviewed thousands of ERP applications, confirmed that the application, as revised on June 8 and at final hearing, meets the criteria for a minor modification. The testimony of District witnesses Waterhouse and Waters has been accepted as being the most credible on this issue. In its review of the original application, the District considered the inclusion of boat docks as the only aspect of the application that made the project a major modification. In all other respects, the District determined that the modification would not cause more than minor changes. With the removal of the boat docks, the District concluded that the application did not substantially alter the design of the activities or the conditions of the conceptual approval permit. Alico's expert, who has never performed a similar consistency analysis on any project, testified that several of the 14 factors in section 6.2.1(d) might be affected. But he opined with certitude that factor 2 is implicated by the Phase IV permit. Factor 2 comes into play when there is an "[i]ncrease in proposed impervious and semi-impervious surfaces more than 10 percent or 0.5 acres, whichever is less, unless the activities were permitted with stormwater treatment and flood attenuation capability sufficient to meet the permitting requirements for the proposed modification." By citing only one factor, the expert implicitly conceded that the other 13 factors are not present, thus weighing towards a finding of consistency. Alico's expert focused only on the first part of factor 2 by calculating the impervious area of the project, as he did not believe the conceptual permit approved a master stormwater management system capable of sufficiently meeting the treatment and attenuation requirements for the Phase IV project. However, the more persuasive evidence is that the Master Plan in the 1999 permit is capable of meeting the treatment and attenuation requirements for the project. Therefore, factor 2 is not implicated by the Phase IV permit. Even if the factor were present, it would be insufficient to outweigh the other 13 factors and render the project a major modification of the 1999 permit. The preponderance of the evidence supports a finding that the District may consider as minor the revised application. Consistency with the Conceptual Permit A consistency analysis is conducted under two related rules. First, rule 62-330.315 identifies when a subsequent permit is either a major or minor modification of a prior conceptual permit. As found in the previous section of this Recommended Order, the modification is minor. Second, rule 62- 330.056 provides a rebuttable presumption that subsequent consistent development phases are likely to meet the applicable rules and regulations if the factors listed in subsections (7)(a) through (7)(d) are met. The primary factors for consistency comparison are identified in subsection (7)(a) as "the size, location and extent of the activities proposed, the type and nature of the activities, percent imperviousness, allowable discharge and points of discharge, location and extent of wetland and other surface water impacts, mitigation plans implemented or proposed, control elevations, extent of stormwater reuse, detention and retention volumes, and the extent of flood elevations." Subsections (7)(b) and (c) provide that in order to have consistency, there can be no changes to state water quality standards, in this case the standards for Lake 5/6, or special basin criteria. There is no evidence that applicable state water quality standards or special basin criteria have changed. Finally, subsection (7)(d) requires that there can be no substantive changes to the site characteristics. Except for the conceptual permit, there is no requirement that the District compare the Phase IV permit with any other permit. The District views the location and the land use type of the project as the two most important criteria for determining consistency. As required by the rule, the District also compares the environmental impacts of the modification to the conceptual permit, control elevations, and discharge rates. The District credibly determined there is no inconsistency. While some site characteristics in Basin 6 have obviously changed over the last 16 years, the District's review found no substantive changes that would affect whether the design concepts approved in the conceptual approval permit can continue to be reasonably expected to meet the conditions for authorizing construction of future phases. The District credibly determined that the activities in Phase IV, as revised, were similar to or less intensive than those authorized in the conceptual approval permit and may actually provide a net benefit to Lake 5/6. Alico contends that a meaningful consistency analysis was not conducted by the District staffer who reviewed the original application. But subsequent reviews by witnesses Waterhouse and Waters confirmed that Phase IV, as revised, is consistent with the conceptual permit based upon the rule and AH criteria. Besides the District's review, Miromar's expert testified that Phase IV is consistent in land use as a single- family residential development. He also testified that the Phase IV permit was consistent with the 1999 permit in size and location; it maintained the same allowable rate of stormwater discharge; and it maintained required flood control elevations. He further testified that the Phase IV permit did not change the mitigation plans, permitted stormwater reuse, flood routings, or storm stages provided by the 1999 permit. This testimony has been credited in resolving the issue. The preponderance of the evidence supports a finding that the Phase IV land uses are the same as contemplated in the conceptual permit and the already-approved prior phases of Miromar Lakes, and the new permit is consistent with the conceptual permit. Therefore, Miromar is entitled to a rebuttable presumption that it meets the applicable rules and standards in place when the 1999 permit was issued. Alico failed to rebut this presumption. Revisions and Amendments at the Final Hearing During the final hearing, Alico's experts identified several errors and/or deficiencies in the design of Miromar's project, described below, that should be addressed before a permit can be issued. Miromar agrees with some of these concerns and asks that they be addressed through revisions incorporated into its permit. The District also concurs with these changes. The record shows that they are appropriate, minor in nature, and do not change the character of the permit. There is no evidence that Alico is prejudiced by allowing these revisions. Alico's expert testified that the Phase IV permit does not provide sufficient information regarding the soils on the Phase IV site. At hearing, Miromar agreed that any unsuitable soils discovered during construction would be excavated and removed and correctly disposed of in a landfill or other uplands. This is the common method of dealing with soils in Lee County, where it is not unusual to find unsuitable soils during construction. A special condition to this effect should be included in the final permit to ensure clarity. Through a series of treatment ponds, Miromar proposes to treat nearly all stormwater that falls on-site prior to its discharge to off-site properties. Alico's expert testified that the lot grading detail drawings inaccurately reflect the elevations of certain portions of the lots and can result in runoff from some lots being routed to Lake 5/6, instead of Lakes 1 and 3. Miromar agrees with this concern and represented that the intent of the June 8 letter is that drainage for all lots, except for the portion of lots within the 20-foot Lake Maintenance Easement (LME), which surrounds the project on three sides, be directed to the front of the lots toward the street, and then to the treatment ponds. Water that falls naturally within the LME will be treated by attenuation in Lake 5/6 prior to off-site discharge. Miromar also agrees to submit new Tabular Lot Grading Revisions and a new Typical Lot Grading Detail and to update its June 8 plans to reflect proposed lot grading elevations consistent with the lot detail. Alico's expert acknowledged that roof gutters are an additional solution, and they should be installed on all roofs in order to direct runoff to the front yards and then to the stormwater system. Finally, to ensure proper lot drainage, Miromar agrees that the secondary drainage pipes to convey runoff from roofs, gutters, and grassed areas will have a minimum size of six inches. The District agrees that these changes will improve water quality and ensure that all stormwater is properly captured and directed into the stormwater system. A special condition requiring these revisions should be included in the final permit to ensure clarity. Alico's expert also testified that the plans should include a requirement that Miromar follow best management practices (BMPs) for the replacement of a control structure in Lake 3, which serves as a stormwater treatment pond. General Condition 3 already addresses this issue by requiring Miromar to use BMPs that prevent adverse impacts to the water resources and adjacent lands. In addition, the June 8 letter provides plans for BMPs for work at the site, including Lake 3. Although the District found that reasonable assurances were provided by General Condition 3 and the June 8 letter, to ensure clarity, a special condition should be included in the final permit that requires the use of BMPs for all construction, including the replacement of an old boat ramp and the control structure in Lake 3. Miromar and the District agree that this revision is appropriate. Alico's expert opined that control structures CS-1 (Lake 1) and WQS-1.3 (Lake 3), which have a circular bleeder orifice with a four-inch diameter, should be limited to a bleeder orifice of 3.7 inches in diameter. Although the District found reasonable assurances existed with four-inch bleeder orifices, Special Condition 3 should be modified to reflect a 3.7-inch bleeder for these control structures. This will ensure that before being discharged, the water leaving the two control structures receives the appropriate amount of water quality treatment. Both Miromar and the District agree that this revision is appropriate. With the removal of all docks and an old boat ramp, Special Conditions 2, 10, 11, and 13 through 17 require modification, or deletion if necessary, to eliminate obsolete language relating to the docks and ramp and to add language to provide that construction and operation of the docks shown on the plans, specifications, and drawings are not authorized. Miromar and the District agree to these revisions. Other Concerns Alico's expert contended that under current District rules, Miromar is required to provide stormwater treatment equal to the greater of (a) one inch multiplied by the total project acreage, and (b) 2.5 inches multiplied by the project's impervious area. However, Alico did not pursue this issue in its PRO, probably because its expert agrees that the current design of the project meets District rule criteria for one inch of water quality treatment. Alico's expert also contends that Miromar is required to provide an additional 50 percent of stormwater treatment above the one-inch requirement. This is contrary to the conceptual permit, which does not require additional stormwater treatment. Also, the requirement does not apply when there is no direct discharge of stormwater into an OFW. Even so, Miromar voluntarily agreed to increase the stormwater treatment capacity for Phase IV, which results in excess treatment in Basin 6 greater than 50 percent above the treatment required for the Phase IV area. Alico argues that the additional treatment is illusory, as it relies on additional treatment from an adjoining phase, and not Phase IV. Even if this is true, Alico's expert admits that the current one inch treatment meets the requirements of the rule for issuance of a permit. Alico's expert contended that the Phase IV permit allows the bulkhead to be developed on more than 40 percent of total shorelines, in contravention of AH section 5.4.2, Volume II, which restricts a bulkhead to no more than 40 percent of the lake perimeter. However, Miromar's expert established that the Phase IV hardened shorelines would comprise less than 40 percent of the total shoreline in the Phase IV area and therefore comply with this requirement. His testimony was not credibly refuted. Even though there is no direct discharge from the project into the Estero River or Estero Bay, and the project will not result in higher discharge rates from the overall system outfall from Lake 5/6, based on water samples taken in August 2015, Alico's expert opined that the project will cause a discharge of excess nutrients into an OFW. The evidence shows, however, that these water samples were taken after heavy rains when the expert observed water flowing upstream from the slough into Lake 5/6, rather than downstream. The expert also admitted he had done no testing, analysis, or modeling demonstrating that any pollutant would even reach the Estero River. He failed to take a baseline sample of water quality for any nutrients for which the slough, Estero River, or Estero Bay may be impaired, and he conceded that it was possible that there was no net discharge from Lake 5/6 into the slough during the time of his testing. There is insufficient evidence to sustain this allegation. Other alleged deficiencies or errors in the application, as revised, that are not addressed in this Recommended Order have been considered and found to be without merit. ERP and Public Interest Criteria The criteria the District uses when reviewing an ERP application are contained in the AH and rules 62-330.301 and 62-330.302. In addition, an applicant must provide reasonable assurance that a proposed project is not contrary to the public interest. § 373.414, Fla. Stat.; AH § 10.2.3. Alico failed to prove by a preponderance of the evidence that Miromar has not provided reasonable assurance that the activities authorized by the ERP comply with all applicable ERP permitting criteria. Alico failed to prove by a preponderance of the evidence that Miromar has not provided reasonable assurance that the proposed project is not contrary to the public interest.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the South Florida Water Management District enter a final order approving Miromar's application, as revised, for a permit modification, subject to the following additional conditions: That the plans, drawings, and specifications submitted with the June 8 letter that appear in Joint Exhibit JA-1, pages 244-53, be used as Exhibit 2.0 of the permit. That the water quality calculations submitted with the June 8 letter that appear in Joint Exhibit JA-1, pages 254-57, be used as Exhibit 2.3 of the permit. That Special Conditions 2, 10, 11, and 13 through 17 be revised or eliminated to remove obsolete language relating to the removal of the boat docks and boat ramp. That Special Condition 10 be revised to require that all construction, including the removal of the boat ramp and replacement of Control Structure No. 3, be conducted using BMPs. That a new special condition be added to reflect that the construction and operation of docks will not be authorized by the permit. That a new special condition be added with new Tabular Lot Grading Revisions and a revised Typical Lot Grading Detail and address the following: the project shall be constructed to ensure that stormwater from the project, except stormwater from within the LME, is routed to the stormwater treatment system prior to discharge to Lake 5/6; the lot grading on all lots shall be in accordance with the revised lot grading to reflect the high point of the lots located adjacent to the LME to ensure that runoff from the lots is directed to Lakes 1 and 3; that the revised lot grading require the installation of six-inch secondary drainage pipes; and that roof gutters be installed on all roofs to ensure that runoff from the residential lots is directed to the stormwater treatment system. That a new special condition be added to address unsuitable soils encountered during construction and to ensure that they are removed and disposed of in an appropriate manner. That Special Condition 3, relating to discharge facilities, be revised to reflect that a 3.7-inch circular orifice will be installed in Sub-Basins 1 and 3, rather than a four-inch orifice shown in the existing plans. DONE AND ENTERED this 27th day of January, 2016, in Tallahassee, Leon County, Florida. S D. R. ALEXANDER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 27th day of January, 2016. COPIES FURNISHED: Peter Antonacci, Executive Director South Florida Water Management District 3301 Gun Club Road West Palm Beach, Florida 33406-3007 (eServed) Kevin S. Hennessy, Esquire Lewis Longman & Walker, P.A. Suite 620 101 Riverfront Boulevard Bradenton, Florida 34205-8841 (eServed) Brian J. Accardo, General Counsel South Florida Water Management District 3301 Gun Club Road West Palm Beach, Florida 33406-3007 (eServed) Keith L. Williams, Esquire South Florida Water Management District 3301 Gun Club Road West Palm Beach, Florida 33406-3007 (eServed) Martin L. Steinberg, Esquire Hogan Lovells US, LLP Suite 2700 600 Brickell Avenue Miami, Florida 33131-3085 (eServed) Timothy J. Perry, Esquire Oertel, Fernandez, Bryant & Atkinson, P.A. Post Office Box 1110 Tallahassee, Florida 32302-1110 (eServed)

Florida Laws (9) 120.569120.57120.573120.60373.079373.119373.414373.4277.09