DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION vs CAYETANO F. ALFONSO, 04-004363PL (2004)
Division of Administrative Hearings, Florida Filed:Miami, Florida Dec. 09, 2004 Number: 04-004363PL Latest Update: May 02, 2005

The Issue Whether Respondent, who is licensed as a Plans Examiner, a Building Inspector, and a Building Code Administrator, committed the offenses alleged in the three-count Administrative Complaint and, if so, the penalties if any that should be imposed.

Findings Of Fact Petitioner is the agency of the State of Florida with the responsibility to regulate Building Code Administrators and Inspectors pursuant to Section 20.165, Chapter 455, and Part XII of Chapter 468, Florida Statutes. At all times relevant to this proceeding, Respondent held licenses as a Standard Plans Examiner in Building and Mechanical; a Standard Inspector in Building and Mechanical; and a Building Code Administrator. Section 468.603(1), Florida Statutes, provides the following definitions relevant to this proceeding: Building code administrator" or "building official" means any of those employees of municipal or county governments with building construction regulation responsibilities who are charged with the responsibility for direct regulatory administration or supervision of plan review, enforcement, or inspection of building construction, erection, repair, addition, remodeling, demolition, or alteration projects that require permitting indicating compliance with building, plumbing, mechanical, electrical, gas, fire prevention, energy, accessibility, and other construction codes as required by state law or municipal or county ordinance. This term is synonymous with "building official" as used in the administrative chapter of the Standard Building Code and the South Florida Building Code. . . . Section 468.603(2), Florida Statutes, provides the following definition relevant to this proceeding: (2) "Building code inspector" means any of those employees of local governments or state agencies with building construction regulation responsibilities who themselves conduct inspections of building construction, erection, repair, addition, or alteration projects that require permitting indicating compliance with building, plumbing, mechanical, electrical, gas, fire prevention, energy, accessibility, and other construction codes as required by state law or municipal or county ordinance. Section 468.603(6), Florida Statutes, provides the following definitions relevant to this proceeding: "Categories of building code inspectors" include the following: "Building inspector" means a person who is qualified to inspect and determine that buildings and structures are constructed in accordance with the provisions of the governing building codes and state accessibility laws. * * * (e) "Mechanical inspector" means a person who is qualified to inspect and determine that the mechanical installations and systems for buildings and structures are in compliance with the provisions of the governing mechanical code. Section 468.603(7), Florida Statutes, provides the following definitions relevant to this proceeding: "Plans examiner" means a person who is qualified to determine that plans submitted for purposes of obtaining building and other permits comply with the applicable building, plumbing, mechanical, electrical, gas, fire prevention, energy, accessibility, and other applicable construction codes. Categories of plans examiners include: (a) Building plans examiner. * * * (c) Mechanical plans examiner. Section 468.603(7), Florida Statutes, provides the following definitions relevant to this proceeding: "Building code enforcement official" or "enforcement official" means a licensed building code administrator, building code inspector, or plans examiner. Ramon Melendez, doing business as R.E.M. Roofing, Inc., was not licensed as a construction contractor in Florida at any time relevant to this proceeding. Mr. Melendez was not individually licensed as a construction contractor in Florida at any time relevant to this proceeding. R.E.M. Roofing, Inc., was not qualified as a construction business by any certified or registered contractor in Florida at any time relevant to this proceeding. On or about March 20, 1998, Mr. Melendez, doing business as R.E.M. Roofing, Inc., contracted with Pedro Camacho to re-roof the residence located at 3961 N.W. 170th Street, Miami, Florida, for the sum of $3,000. Mr. Camacho paid Mr. Melendez the agreed sum in cash based on the contract dated March 20, 1998. On or about June 3, 1998, Mr. Melendez, doing business as R.E.M. Roofing, Inc., contracted with Santos Valentin to re- roof the residence located at 4412 N.W. 185th Street, Opa Locka, Florida, for the sum of $2,800. Mr. Valentin paid R.E.M. Roofing, Inc. the sum of $1,400 on June 8, 1998. Mr. Valentin paid Mr. Melendez the additional sum of $800 on June 10, 1998. Both payments, which were by check, were for the roofing work described in the contract dated June 3, 1998. On April 6, 1998, Respondent applied for and obtained a permit for the Camacho roofing work. This permit application was submitted to the Metropolitan Dade County Department of Planning Development and Regulation. Respondent signed the permit application as “the contractor” and inserted his contractor license number and social security number on the application. The application submitted by Respondent on April 6, 1998, was a fraudulent sham. At no time was Respondent the contractor for the Camacho roofing work. Respondent’s action in obtaining the building permit aided and abetted an unlicensed contractor to engage in contracting. On June 8, 1998, Respondent applied for and obtained a permit for the Valentin roofing work. This permit application was submitted to the Metropolitan Dade County Department of Planning Development and Regulation. Respondent signed the permit application as “the contractor” and inserted his contractor license number and social security number on the application. The application submitted by Respondent on June 8, 1998, was a fraudulent sham. At no time was Respondent the contractor for the Valentin roofing work. Respondent’s action in obtaining the building permit aided and abetted an unlicensed contractor to engage in contracting. Miami-Dade County Compliance Investigator Daniel Vuelta filed criminal charges against Respondent in two separate criminal cases. One case was for his involvement in the Camacho roofing project and the other was for his involvement in the Valentin roofing projects. These cases were brought in Miami- Dade County Court and assigned case numbers M99-57926 and M99- 57931. In each case, Respondent was charged with one count of Unlawful Application for Building Permit and one count of Aiding and Abetting an Unlicensed Contractor. All charges were first- degree misdemeanors. On February 22, 2001, Respondent entered into a plea agreement to resolve those criminal charges. Respondent entered a plea of guilty to each of the two counts in Case M99-57931, and he was subsequently adjudicated guilty of each count. As part of the plea agreement, the State agreed to nolle pross Case M99-57926. The crimes to which Respondent entered a guilty plea involved fraudulent building permits and, consequently, were directly related to building code enforcement. Petitioner’s investigative costs for this case, excluding costs associated with any attorney’s time, were $427.29.

Recommendation Based on the foregoing findings of fact and conclusions of Law, it is RECOMMENDED that Petitioner enter a final order finding Respondent guilty of the offenses alleged in Counts I, II, and III. It is further RECOMMENDED that the final order revoke Respondent’s licensure and impose an administrative fine against him in the amount of $3,000. It is further RECOMMENDED that Petitioner order Respondent to pay its investigative costs, excluding costs associated with any attorney’s time, in the amount of $427.29. DONE AND ENTERED this 7th day of April, 2005, in Tallahassee, Leon County, Florida. S CLAUDE B. ARRINGTON Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 7th day of April, 2005.

Florida Laws (6) 120.5720.165455.227468.221468.603468.621
# 2
CONSTRUCTION INDUSTRY LICENSING BOARD vs. JOSEPH H. RAYL, 87-000611 (1987)
Division of Administrative Hearings, Florida Number: 87-000611 Latest Update: Aug. 05, 1988

Findings Of Fact At all times material hereto, Respondent was licensed by the Construction Industry Licensing Board as a registered roofing contractor (RC- 0034055), building contractor (CB-C033206), and certified roofing contractor (CC-C035625). At the time of hearing, license RC-0034055 had expired and was no longer in effect. Although Petitioner introduced a "certification of licensure", executed by its custodian of records which purports to establish prior disciplinary action by the Construction Industry Licensing Board against Respondent, said certification references license number CG-C024378. There is no documentation in the record to establish that Respondent has license number CG-C024378, and in any event if this is, in fact, his license, this case does not involve license number CG-C024378. The records' custodian was not present to testify or to be cross-examined, and therefore this apparent discrepancy in the certification is unexplained. Further, the only documentation introduced to support prior disciplinary action by the Board against one of Respondent's licenses, is a certified copy of an order dated August 7, 1985 (Case No. 0051210), but this case involves license RC-0034055, which expired in July 1987 and is no longer in effect. Therefore, it has not been established by evidence in this record that Respondent has previously been subject to disciplinary action by the Construction Industry Licensing Board concerning his current valid licenses, CB- C033206 and CC-C035625. Respondent was the qualifying agent at all times material hereto, of Unique Construction, Inc., 1302 North Clearview Avenue, Tampa, Florida. On February 25, 1986, George Katsarelis entered into a sales contract with Unique Construction, Inc., to reroof his entire house at 6 Venetian Court, Tarpon Springs, Florida. Respondent was not present when the contract was executed, and had not met Katsarelis at the time work commenced on the job. Katsarelis specified to the salesman representing Unique Construction, Inc., that he wanted to be sure all required local permits were pulled for this job. Work on the Katsarelis roof began within only a few days of the execution of the sales contact. Crews from Unique Construction tore off approximately 80% of the Katsarelis roof before a City of Tarpon Springs building inspector stopped work on the job because no permit had been obtained. Thereafter, it took two days for Unique to put a temporary cover over Katsarelis' uncovered roof while a permit was being obtained. A permit was finally obtained on March 19, 1986, and the work was completed. Katsarelis paid Unique Construction, Inc., $7,000, the full contract amount, for reroofing of his home. Between February 25, 1986, and December 1987, Katsarelis had to repeatedly call Unique Construction since his roof leaked every time it rained. A ten foot ceiling section in his Florida room eventually caved in due to these leaks. In December 1987, Respondent came to Katsarelis' home for the first time and decided to reroof the whole house for a second time. No additional payment was required or made by Katsarelis for this second reroofing job. After a hard rain in April 1988 his roof again leaked, and within a week prior to hearing, Respondent made a third attempt to correct Katsarelis' leak problem. According to expert testimony and evidence offered at hearing by Owen Baynard, who was accepted as an expert in roofing, work performed by Unique Construction on the Katsarelis roof was incompetent and the result of a lack of proper supervision of the work crews by the qualifying agent, Respondent. The job fails to meet the standards of local building practices. There was improper and insufficient preparation of the roof surface, a lack of adequate adhesive, nailing, and mopping to meet Sections 101, 107, 109 and 113 of the Southern Standard Building Code Roof Coverings standards, applicable in this case. The only way to remedy Katsarelis' continuing leak problem is to completely redo all work done by Unique Construction on his roof, and completely reroof his house in a workmanlike manner. As qualifying agent for Unique, Respondent was responsible for beginning work on Katsarelis' roof without obtaining or assuring that someone else had obtained a local permit for the job. A permit was not posted on the site when this work began, in violation of local building code requirements. Respondent failed to obtain required local building department inspections on the job. Respondent's actions on the Katsarelis job, as qualifying agent and in actions taken personally on two occasions to correct continued leakage, were incompetent and of substandard quality. On December 17, 1986, Lawrence E. Burkett entered into a sales contract with Unique Construction, Inc., to reroof his home on 62nd Avenue, N.E., in St. Petersburg, Florida. Work commenced shortly after this contract was executed, and upon completion Burkett paid Unique $3,657, the contract amount. Respondent admits that leaks continued to exist in Burkett's roof for nine or ten months after Unique's crews worked on his roof. Finally, on September 16, 1986, Unique's crew replaced a section of roof and this corrected the leaking. In an attempt to correct or prevent damage from leakage, Unique's crews installed pans between Burkett's drop ceiling and the roof to catch water which was leaking into his Florida room. A permit was not posted on the Burkett job, but the record does not establish whether a local permit for this job was required to be posted. On or about February 23, 1987, Respondent was issued a letter of reprimand by the United Construction Trades Board of the City of Tampa. However, no action was taken against his local certificate. This reprimand resulted from a roofing job performed by Respondent on the home of Gerald T. Minnick in late 1986. Repeated attempts by Respondent to correct leakage in the Minnick roof failed.

Recommendation Based upon the foregoing, it is recommended that the Construction Industry Licensing Board enter a Final Order suspending Respondent's licenses numbered CB-C033206 and CC-C035625 for a period of six (6) months and imposing an administrative fine of $2,500; provided that after the expiration of thirty (30) days from the issuance of the Final Order if Respondent pays said fine in full, his license shall be immediately reinstated. DONE AND ENTERED in Tallahassee, Leon County, Florida, this 5th day of August, 1988. DONALD D. CONN Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1050 Filed with the Clerk of the Division of Administrative Hearings this 5th day of August, 1988. COPIES FURNISHED: David Bryant, Esquire 220 East Madison Street Tampa, Florida 33602 William E. Whitlock, III, Esquire 116 East 3rd Avenue Tallahassee, Florida 32303 Fred Seely, Executive Director Department of Professional Regulation Construction Industry Licensing Board Post Office Box 2 Jacksonville, Florida 32201 William O'Neil, Esquire General Counsel Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32399-0750 =================================================================

Florida Laws (5) 120.5717.001489.105489.119489.129
# 4
DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION, CONSTRUCTION INDUSTRY LICENSING BOARD vs DAVID G. MALT, 01-002108PL (2001)
Division of Administrative Hearings, Florida Filed:West Palm Beach, Florida May 31, 2001 Number: 01-002108PL Latest Update: Feb. 15, 2002

The Issue Whether Respondent committed the offenses alleged in the Administrative Complaint and the penalties, if any, that should be imposed.

Findings Of Fact Petitioner is a licensing and regulatory agency of the State of Florida charged with the responsibility and duty to prosecute administrative complaints pursuant to Chapters 455 and 489, Florida Statutes. At all times pertinent to this proceeding, Respondent was licensed as a certified building contractor and a certified roofing contractor, having been issued license numbers CC C027427 and CB C023123. At all times pertinent to this proceeding, MCI was a corporation engaged in roofing contracting, and Respondent was its qualifying agent. A re-roofing job by MCI on the shared roof of two townhouses located at 105 and 106 Woodland Road, the Village of Palm Springs, Florida (the Village), is at issue in this proceeding. These two townhouses are part of a building consisting of four townhouses. All four townhouses have a shared roof. Essentially, the work by MCI was to re-roof half of the entire roof. At the times material to this proceeding Lawrence Gauer owned the townhouse at 105 Woodland Road (Gauer townhouse) and RCM owned the townhouse at 106 Woodland Road (RCM townhouse). Both townhouses are within the permitting jurisdiction of the Village. Mr. Malt, Respondent's brother, owns RCM. Mr. Malt is a certified general contractor, developer, and real estate broker. Mr. Malt has extensive experience building townhouses, having built over 4,000 dwelling units, including the townhouses where the work at issue in this proceeding occurred. Mr. Malt also owns the company that manufactured the engineered pre-stressed concrete structural members that served as the foundation for the roof at issue in this proceeding. Mr. Malt is not a licensed roofing contractor, and his general contractor’s license does not authorize him to perform roofing work. In the fall of 1998, Mr. Malt determined that the RCM townhouse should be re-roofed. Mr. Malt contacted the owners of the other three townhouses to determine whether they wanted to re-roof their portions of the shared roof. Mr. Gauer decided to have his part of the shared roof re-roofed with Mr. Malt, but the owners of the other two townhouses declined. At all times material to this proceeding, Respondent authorized Mr. Malt to act as an agent for MCI. On January 7, 1999, MCI contracted with Mr. Gauer and with RCM to perform the work at issue in this proceeding. Mr. Gauer signed the contract in his capacity as owner of his townhouse. Mr. Malt signed the contract on behalf of RCM as owner of its townhouse. Mr. Malt also signed the contract on behalf of MCI in his capacity as its agent. The total amount of the contract was $5,000, with each owner (Mr. Gauer and RCM) being responsible for payment of $2,500. The contract required each owner to pay $1,250 upon execution of the contract with the balance due within five days ". . . of completion (inspection by the Village . . .)". On or about January 7, 1999, Mr. Gauer paid $1,850 to MCI. There was no explanation as to why Mr. Gauer paid more than the contract required on that date. Respondent's license number did not appear in the contract, and the contract did not contain a written statement explaining the rights of consumers under the Construction Industries Recovery Fund. On January 13, 1999, Mr. Malt, as agent for MCI, applied to the Village for the requisite building permits for the subject work. On January 13, 1999, the Village issued two separate permits, one for each townhouse, authorizing the re- roofing work contemplated by the subject contract. Each permit reflected that the valuation of the work was $2,500. Consistent with the applicable building code, the Village's building department issued a notice with each permit that because the roof was flat, the roof had to provide positive drainage to prevent the ponding of water or the roof had to be constructed of specific water retaining material. Mr. Malt, as agent for MCI, hired the crew that performed the roofing work at issue in this proceeding. At all times material to this proceeding, Mr. Malt supervised the roofing crew that worked on the two townhouses. Prior to beginning work on the roof, Mr. Malt checked weather forecasts for the area. On January 13, 1999, the roofing crew removed the existing roofing material from the roof. At the end of the workday, the crew covered the exposed roof with plastic sheeting commonly referred to as Visqueen. For a flat roof, the accepted standard in the roofing industry is to remove only as much roofing material as can be replaced with finished roofing material the same day. A plastic sheeting such as Visqueen is inadequate to protect an exposed flat roof from a heavy rainfall. The failure to adequately protect the exposed roof on January 13, 1999, constituted negligence. On the night of January 13, 1999, an unexpected heavy rainfall event occurred. As a consequence of the rainfall and the inadequately protected roof, substantial amounts of rainfall intruded in both townhouses, causing extensive damage. The work crew spent most of January 14, 1999, cleaning up following the rain event the previous day. As of Friday, January 15, 1999, the roof was still exposed. On that date, MCI installed a base coat of hot asphalt and insulation, which was inadequate to waterproof the flat roof. At the end of the workday, the roofing crew covered the roof with Visqueen and left for the weekend. On January 16, 1999, additional heavy rains occurred. Again, as a consequence of the rainfall and the inadequately protected roof, substantial amounts of rainfall intruded in both townhouses, causing additional damage to both townhouses. The failure to adequately protect the exposed roof constituted negligence. Mr. Gauer's homeowner's insurance company paid his policy limits for emergency services and repairs to his townhouse. The repairs were completed on or about February 19, 1999. Mr. Gauer subrogated his rights against MCI to his insurance company. There was a civil action pending by the insurance company against MCI at the time of the final hearing based on the subrogation rights. Mr. Gauer's homeowner's insurance did not cover damages to his or Mr. Poitivent's personal property. The value of those losses was not established. During the week beginning January 18, 1999, MCI installed new roofing material on the roof. In doing so, the roofing crew covered the clothes dryer vent for each townhouse with roofing material. As a result, Mr. Gauer's clothes dryer did not vent properly, and he paid an independent contractor $250.00 to inspect and clean out the dryer vent. MCI promptly corrected the deficient work after Mr. Gauer told Mr. Malt that his dryer vent had been covered during the re-roofing. The accepted standard in the roofing industry is that roof vents are not to be covered over without some specific instruction to do so. MCI's failure to adhere to that standard constituted negligence. MCI asserted that it completed the roofing work in 1999. At the times pertinent to this proceeding, Craig Johns was a building inspector for the Village. Mr. Johns inspected the subject roof on the following dates in 1999: June 15, July 15, August 12, and August 30. Following each inspection, Mr. Johns found that the roof did not pass inspection. Among other deficiencies, Mr. Johns found that the roof did not provide positive drainage, which was required for a flat roof covered in asphalt. 2/ As of the final hearing, MCI had not obtained a passing final inspection from the Village's building department. Mr. Malt established that Respondent had just cause to believe that MCI had completed all work on the project in 1999. Consequently, Respondent is not guilty of abandoning the work within the meaning of Section 489.129(1)(k), Florida Statutes (1997). As of June 15, 2001, Petitioner's costs of investigation and prosecution in this case, excluding costs associated with attorney's time, totaled $794.23. 3/

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that Petitioner enter a final order finding Respondent guilty of the violations alleged in Counts I, II, V, and VI of the Administrative Complaint. The recommended penalty for the violation alleged in Count I is an administrative fine in the amount of $100. The recommended penalty for the violation alleged in Count II is an administrative fine in the amount of $100. The recommended penalty for the violation alleged in Count V is an administrative fine in the amount of $500. The recommended penalty for the violation alleged in Count VI is an administrative fine in the amount of $500. It is further recommended that the final order require Respondent to pay Mr. Gauer restitution in the amount of $250. It is further recommended that the final order require Respondent to pay investigative costs in the amount of $794.23. DONE AND ENTERED this 5th day of November, 2001, in Tallahassee, Leon County, Florida. CLAUDE B. ARRINGTON Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 5th day of November, 2001.

Florida Laws (8) 120.5717.001489.119489.1195489.125489.129489.141489.1425
# 5
CONSTRUCTION INDUSTRY LICENSING BOARD vs. MARK W. GELLING, 88-000562 (1988)
Division of Administrative Hearings, Florida Number: 88-000562 Latest Update: Jul. 28, 1988

Findings Of Fact At all times relevant, the Respondent was licensed by the Construction Industry Licensing Board as follows: License No(s): RC 0021957 Licensed as: Registered roofing contractor Address of record is in: New Port Richey, Florida A certain contracting job was undertaken as follows: Customer: Stella Domas Approximate contract date: 6-85 Approximate price: $600 Job location: New Port Richey, Florida Job generally consisted of: Repair roof of Customer's house Said job was undertaken by the contracting business Respondent was associated with and responsible for in his capacity as a licensee. Respondent proceeded without a timely permit having been issued, violating local law, either deliberately or through improper supervision, in violation of 489.129(1)(d), (m), (j) 489.119; and 489.105(4), Florida Statutes. Respondent proceeded without timely obtaining all required inspections, violating local law, either deliberately or through improper supervision, in violation of 489.129(1)(d), (m), (j); 489.119; 489.105(4), Florida Statutes. Respondent gave a guarantee on said job to the Customer, and thereafter failed to reasonably honor said guarantee, in violation of 489.129(1)(m), (j); 489.119; 489.105(4), Florida Statutes. Respondent performed said work in a substantially deficient manner, therefore, violating 489.129(1)(m). Respondent previously has been disciplined by the State Construction Board. STIPULATED DISPOSITION Based on the Stipulated Findings Of Fact and Conclusions Of Law, the parties agree to the following disposition of the Amended Administrative Complaint: The Respondent shall pay a $1500 fine, payable within 60 days from entry of a final order approving this stipulated disposition; and The Respondent's registered roofing contractor license number RC 0021957 shall be suspended for 60 days, beginning 60 days from the entry of a final order approving this stipulated disposition.

Recommendation It is recommended that the Construction Industry Licensing Board enter a final order approving and incorporating the settlement stipulation between the parties. RECOMMENDED 28th day of July, 1988, in Tallahassee, Florida. J. LAWRENCE JOHNSTON Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 28th day of July, 1988. COPIES FURNISHED: Jack M. Larkin, Esquire 806 Jackson Street Tampa, Florida 33602 Lee Ellen Acevedo, Esquire 7716 Massachusetts Avenue New Port Richey, Florida 34653 Fred Seely, Executive Director Construction Industry Licensing Board Department of Professional Regulation Post Office Box 2 Jacksonville, Florida 32201 William O'Neil, Esquire General Counsel Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32399-0750

Florida Laws (3) 489.105489.119489.129
# 6
CONSTRUCTION INDUSTRY LICENSING BOARD vs LOUIS GORDON, 90-002813 (1990)
Division of Administrative Hearings, Florida Filed:Miami, Florida May 08, 1990 Number: 90-002813 Latest Update: Sep. 27, 1990

The Issue Whether Respondent committed the offenses described in the administrative complaint? If so, what disciplinary action should be taken against him?

Findings Of Fact Respondent is now, and has been since 1982, a roofing contractor licensed to practice in the State of Florida. He holds license number RC 0041149. At all times material hereto, Respondent has been the licensed qualifying agent for Reinforcement Roofing and Painting Company (Reinforcement). On or about November 29, 1987, Reinforcement, through Respondent, entered into a written contract with Wayne Leidecker in which it agreed, for $4,655.00, excluding permit fees and taxes, to replace the roof on Leidecker's residence, located at 18280 S.W. 202nd Street in Miami, Florida. Shortly thereafter, Reinforcement obtained a permit from the Metropolitan Dade County Building and Zoning Department to perform the work specified in the contract. It then proceeded to begin work on the project. The felt underlayer of the new roof was improperly installed. Reinforcement laid the shingles over this improperly installed felt underlayer without first calling for a tin cap/anchor sheet inspection, in willful violation of the local building code. The result was a roof having a "wavy" appearance. To make matters worse, some of the shingles were not properly fastened to the roof deck. Furthermore, the metal eaves and gable drips were installed too close to the facie in violation of the local building code. The work on the Leidecker project, which was performed under the supervision of Respondent, was completed in January, 1988. The job, however, having been done in an incompetent manner, failed its final inspection. Efforts were subsequently made by Reinforcement, under the direction of Respondent, to correct the foregoing problems. These efforts were inadequate and unsuccessful. Consequently, the project was still unable to pass a final inspection. Leidecker was growing increasingly impatient. In the latter part of 1988, he had Charles H. Walton, the Vice-President of Bob Hilson & Company, Inc., examine the roof. Based upon his examination, Walton concluded, in a written report which he gave Leidecker, that "[d]ue to all of the above deficiencies, South Florida Building Code infractions and the waviness of the shingles, the only way that I can truthfully say that this roof can be properly corrected is to remove this existing shingle roof entirely to a smooth workable surface and reinstall a new 3-tab, 20 year type fungus resistant fiberglass shingle roof system, that meets all of the South Florida Building Code specifications and manufacturers' requirements." This was consistent with what Leidecker had been told by the building inspectors who had previously inspected the roof. Accordingly, after receiving Walton's report, Leidecker refused to allow Reinforcement to do any further patchwork on the roof. He expected Reinforcement to take the removal and reinstallation measures Walton had recommended in his written report. He would accept nothing less. By letter dated July 14, 1989, Respondent was informed that a formal hearing would be held before the Dade County Construction Trades Qualifying Board (CTQB) on the following four charges filed against him relating to the Leidecker project: Between November 28, 1987 and January 31, 1989, Reinforcement Roofing & Painting, Co., and/or Louis Gordon as the Qualifying Agent there for as a Roofing and Painting Contractor did unlawfully violate Section 3401.4(c) of the South Florida Building Code (SFBC) by failing to obtain the final roofing inspection required at a roofing job located at 18280 S.W. 202nd Street Miami, Dade County, Florida; said violation evidencing a failure to maintain the affirmative condition of honesty, integrity and good character as required for the issuance of a certificate of competency under Section 10-16(a) of the Code of Metropolitan Dade County. Between November 28, 1987 and January 31, 1989, Reinforcement Roofing & Painting, Co., and/or Louis Gordon as the Qualifying Agent there for as a Roofing and Painting Contractor did unlawfully violate Section 3403.3(h)(2) of the South Florida Building Code (SFBC) by failing to imbed sheets of roofing felt without wrinkles or buckles as required at a roofing job located at 18280 S.W. 202nd Street, Miami, Dade County, Florida; said violation evidencing a failure to maintain the affirmative condition of honesty, integrity and good character as required for the issuance of a certificate of competency under Section 10-16(a) of the Code of Metropolitan Dade County. Between November 28, 1987 and January 31, 1989, Reinforcement Roofing & Painting, Co., and/or Louis Gordon as the Qualifying Agent there for as a Roofing and Painting Contractor did unlawfully violate Section 3408.3(c) of the South Florida Building Code (SFBC) by failing to install metal eave and/or gable drips so the bottom of said metal drips did not touch facie and did [not] have the minimum of a one-half inch clearance from the structure as required at a roofing job located at 18280 S.W. 202nd Street, Miami, Dade County, Florida; said violation evidencing a failure to maintain the affirmative condition of honesty, integrity and good character as required for the issuance of a certificate of competency under Section 10-16(a) of the Code of Metropolitan Dade County. Between November 28, 1987 and January 31, 1989, Reinforcement Roofing & Painting, Co., and/or Louis Gordon as the Qualifying Agent there for as a Roofing and Painting Contractor did unlawfully violate Section 10-22(a) of the Code of Metropolitan Dade County, Florida, in that they did fail to fulfill their contractual obligation to honor a six (6) year warranty in connection with roofing work done on the residence located at 18280 S.W. 202nd Street, Miami, Dade County, Florida. The hearing on these charges was held as scheduled on August 10, 1989. The CTQB found Respondent guilty of Charges 1, 2 and 3 and not guilty of Charge The following penalties were imposed: Charge 1- six-month suspension of Respondent's personal and business certificates and a fine of $1,000.00; Charge 2- six-month suspension of Respondent's personal and business certificates and a fine of $250.00; and Charge 3- official letter of reprimand and a fine of $250.00. In addition, he was directed to pay $257.00 in administrative costs. On October 12, 1989, Respondent made another appearance before the CTQB. He made a request that the foregoing penalties be reduced. His request was granted. The CTQB "lifted" his suspension, but with the caveat that if he did not timely pay his fines the suspension would be reinstated. Respondent failed to make timely payment. As a result, his suspension was reinstated. Neither Reinforcement, nor Respondent in his individual capacity, has yet to take the measures necessary to correct the problems with the Leidecker roof that were caused by the shoddy work done under Respondent's inadequate supervision. Respondent has been disciplined on two separate, prior occasions by the Construction Industry Licensing Board for conduct unrelated to that which is the subject of the charges filed against him in the instant case. On February 12, 1986, the Board issued a final order in Case No. 0053301 imposing a $250.00 administrative fine upon Respondent. On June 16, 1988, in another case, Case No. 81135, the Board fined Respondent $500.00 for violating the provisions of Section 489.129(1)(i), Florida Statutes.

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is hereby RECOMMENDED that the Construction Industry Licensing Board enter a final order finding Respondent guilty of the violations of Section 489.129, Florida Statutes, charged in the instant amended administrative complaint and suspending Respondent's license for a period one year and imposing upon him a fine in the amount of $3,500.00 for having committed these violations. DONE AND ENTERED in Tallahassee, Leon County, Florida, this 27th day of September, 1990. STUART M. LERNER Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 27th day of September, 1990.

Florida Laws (4) 489.105489.115489.119489.129
# 7
PINELLAS COUNTY CONSTRUCTION LICENSING BOARD vs EDDIE A. SHADEN, 92-001315 (1992)
Division of Administrative Hearings, Florida Filed:Clearwater, Florida Feb. 27, 1992 Number: 92-001315 Latest Update: Sep. 05, 1995

The Issue Whether Respondent violated provisions of Chapter 75-489, Laws of Florida, as amended, as more specifically alleged in Administrative Complaint dated February 10, 1992.

Findings Of Fact At all times relevant hereto Respondent was licensed by Petitioner as a certified building contractor having been issued license C-608, and was qualifying agent for Bay City Builders, Inc. Bay City Builders, Inc., entered into a contract to add four bedrooms and two baths to a residence in Dunedin, Florida, being used as an Adult Congregate Living Facility (ACLF) (Exhibits 1 and 2), at a price of $32,000. The contract provided, inter alia, that the contractor would provide all permits and fees directly associated with the project. Upon signing the original contract on September 26, 1991, the owner paid Bay City Builders $3200 (Exhibit 3). On October 8, 1991, the owner paid Bay City Builders an additional $7200 (Exhibit 3) when the plans were presented to the owner. Prior to the issuance of the permit for this project, Bay City Builders poured the footing for the building addition. The permit application was signed by Respondent. After entering into the contract, Bay City Builders found there was an impact fee involved, the project was never completed and was subsequently abandoned. Bay City Builders prepared a second contract for this project which increased the price to $41,789 (Exhibit 5) and presented this to the owner who did not accept the new contract. Respondent admits that he was the qualifying contractor for Bay City Builders, and the permit was pulled under his license, but contends he had nothing to do with the financial arrangements between Bay City Builders and the owner. Respondent was paid a flat fee by Bay City Builders for obtaining permits under his license for work Bay City Builders contracted to perform. He occasionally visited the sites where work was being performed by Bay City Builders. Bay City Builders is not licensed. The permit for the ACLF addition was applied for on November 1, 1991, but was not issued by the City of Dunedin until February 13, 1992 (Exhibit 6). It could have been picked up any time after November 30, 1991. On September 5, 1991, Bay City Builders entered into a contract with an owner living in Seminole, Florida, to replace the roof over a rear porch of this residence for a total price of $900. (Exhibit 8) This was a flat roof, and the initial intent was to replace the tar and gravel roof with tar and gravel. At the time construction started on September 11, 1991, the person doing the installation used a rubberized roof, which was satisfactory to the owner and gave the owner a 5 year unconditional warranty. Respondent's license does not authorize him to reroof an existing building, and no permit was applied for to perform this job. No certified roofer was engaged to do this reroofing, the rubberized compound applied to the roof was improperly applied and the roof started leaking when the first rain came. Workers from Bay City Builders came to the residence several times to attempt to patch the leaks, but the leaks persisted. Ultimately, the owner had to employ a qualified roofing contractor to redo the roof. While Bay City Builders was attempting to stop the leaks, the ceiling over the porch was also ruined and had to be replaced. In his testimony, Respondent admitted that he was the sole qualifying contractor for Bay City Builders, that his function was to give Bay City Builders a price estimate for the work intended, including the ACLF addition, but the owner of Bay City Builders entered into a contract for $5000 less than Respondent's estimate for the ACLF. Respondent also acknowledged that Bay City Builders, acting under Respondent's license, entered into contracts for some 150 jobs, but that Respondent was told or learned of only 60 of these projects. Respondent was paid a fixed fee by Bay City Builders for each permit obtained, and he prepared estimates of cost.

# 8
CONSTRUCTION INDUSTRY LICENSING BOARD vs. TROY GRIFFIN, 85-000655 (1985)
Division of Administrative Hearings, Florida Number: 85-000655 Latest Update: Aug. 23, 1985

Findings Of Fact The Respondent's name is Troy Griffin. The Respondent is now and was at all times relevant to the pending Administrative Complaint, a registered residential contractor in the State of Florida having been issued license number RR 0030688. The Respondent is not now and at no time material to the pending Administrative Complaint was the Respondent a certified or registered roofing contractor in the State of Florida. At all times material to the pending Administrative Complaint, the Respondent's license #RR 0030688 qualified Griffin Remodeling & Repairs, Jacksonville, Florida. In June 1978 the Respondent d/b/a Griffin Remodeling and Repairs contracted to repair the residence of June Moody, Jacksonville, Florida. The contracting work included work upon the Moody's built-up roof, which Respondent re-roofed pursuant to contract. Respondent built up the roof with more than one layer of felt in 1978. These layers were discovered by the city's inspector in 1982. Respondent returned in 1978 and patched the roof he installed. These patches were seen by the city's inspector in 1982. The owner, Moody, did not complain of leaks in 1982. There was no evidence of leaks in 1982. A roof poorly installed without sufficient tar and felt will leak within the time that has passed between 1978 and 1982. See inspector's testimony in response to Hearing Officer's question. Moody's home was a single family, one story residence. No evidence was received regarding whether the City of Jacksonville requires examinations of roofing contractors prior to their certification.

Recommendation Having found that the Respondent did not commit the alleged violations, it is recommended that the Administrative Complaint be dismissed and no action be taken. DONE and ORDERED this 23rd day of August, 1985, in Tallahassee, Florida. STEPHEN F. DEAN Hearing Officer Division of Administrative Hearings The Oakland Buildina 2009 Apalachee Parkway Tallahassee, Florida 32301 (904)488-9675 Filed with the Clerk of the Division of Administrative Hearings this 23rd day of August, 1985. COPIES FURNISHED: W. Douglas Beason, Esq. Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 Troy Griffin 7443 Laura Street Jacksonville, Florida 32202 Fred Roche, Secretary Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 James Linnan, Executive Direetor Department of Professional -I Regulation. Construction Industry Licensing Board P. O. Box 2 Jacksonville, Florida 32202

Florida Laws (3) 120.57489.105489.113
# 9
FLORIDA BOARD OF PROFESSIONAL ENGINEERS vs LAWRENCE BENNETT, P.E., 09-005542PL (2009)
Division of Administrative Hearings, Florida Filed:Daytona Beach, Florida Oct. 12, 2009 Number: 09-005542PL Latest Update: Jan. 11, 2025