MATHEWS CONSULTING, INC. vs SOUTH FLORIDA WATER MANAGEMENT DISTRICT, 98-004073 (1998)
Division of Administrative Hearings, Florida Filed:West Palm Beach, Florida Sep. 11, 1998 Number: 98-004073 Latest Update: Sep. 27, 2004

The Issue Whether Petitioner is eligible for certification as a Minority/Woman Business Enterprise pursuant to Chapter 40E-7, Part VI, Florida Administrative Code.

Findings Of Fact Petitioner, Mathews Consulting, Inc. (MCI), is a Florida corporation, incorporated on January 28, 1998, by Rene L. Mathews, a female, and David L. Mathews, a white male. Rene and David Mathews are and were married at the time MCI was incorporated. Ms. Mathews owns 55 percent of the stock of MCI, and Mr. Mathews owns the remaining 45 percent of the stock. Ms. Mathews is the President and Treasurer of MCI, and Mr. Mathews is the Vice President and Secretary. Ms. Mathews has a bachelor of science degree in civil engineering and has been a professional engineer licensed with the State of Florida since 1995. Her primary engineering practice areas are water and waste water treatment, industrial pretreatment, civil engineering, regulatory compliance, odor control/air quality assurance, and construction management. Prior to becoming employed full time with MCI, Ms. Mathews was employed for 8 years as a civil engineer with Hazen and Sawyer. Mr. Mathews is a professional engineer employed full time by Hazen and Sawyer. He specializes mainly in underground pipeline work and landfills. MCI has a board of directors consisting of two people: Rene and David Mathews. The ByLaws of MCI provide at Article Three, Section 3: Except as provided in the Articles of Incorporation and by law, all corporate powers shall be exercised by or under the authority of, and the business and affairs of the Corporation shall be managed under the direction of, its Board of Directors. MCI is in the business of providing engineering consulting services in the areas of water and waste water treatment, industrial pretreatment, civil engineering, regulatory compliance, odor control/air quality assurance, and construction management. MCI obtained a $30,000 loan and a $20,000 line of credit from Barnett Bank (collectively referred to hereafter as the Loan) to be used as start-up capital for MCI. The Loan was evidenced by a promissory note and guaranteed by a security agreement. The bank required both Rene Mathews and David Mathews to individually guarantee the Loan jointly and severally because they were the owners and officers of the corporation. David Mathews is an authorized signatory on MCI's bank account. Mr. Mathews is not authorized on the company credit card or ATM card and has not signed any checks for the company. MCI submitted an application dated June 4, 1998, to Respondent, South Florida Water Management District (District), for certification as a Minority/Woman Business Enterprise (M/WBE). By letter dated June 10, 1998, the District denied MCI's application, stating the following reasons: Documents do not support real and substantial ownership by the minority or woman applicant(s). Rule 40E-7.653(2) Documents do not support that the day-to- day operations are controlled by the minority/woman, nor is there evidence that the minority possess (sic) the authority to direct the management and policy of the business. Rule 40E-7.653.4(4)(a) The composition of the Board of Directors, regardless of percentage of ownership, is not made-up of a majority of minority/woman directors. If the applicant business is a corporation and the business and affairs of the corporation are managed under the direction of a board of directors as provided in the Articles of Incorporation or ByLaws of the corporation or Section 607.0824, Florida Statute, a majority of the directors must be minority/woman, not withstanding whether the directors are required to be elected by a majority vote of the outstanding shares of the corporation. Rule 40E-7.653.4(4)(b) The June 10, 1998, letter provided that if an applicant believes that it has been wrongly denied certification that the applicant may request an administrative hearing or do the following: Submit any information or documentation which clarifies the documentation submitted with the original application and/or request the opportunity to meet with the Office of Supplier Diversity & Outreach within fifteen (15) calendar days of receipt of this notice. The District will only consider information that clarifies the documentation in your original application. Changes occurring after the submission of your original application (i.e., any changes in corporate structure) will not be accepted as clarifying documentation. This office, after its review of any clarifying information will notify the applicant business by certified mail of its final decision to either uphold or overturn its decision to deny the application for certification. If the denial decision is upheld, you may petition for an administrative hearing in accordance with Rule 40E-1.521, Florida Administrative Code. The Petition must be received by the District's Office of Counsel within fifteen days of actual receipt of notice of decision to uphold the denial of certification. On June 15, 1998, after the District had denied MCI's application, Rene Mathews had a telephone conversation with Candice Boyer, a business operations analyst with the District. Ms. Boyer explained to Ms. Mathews the decision for denial was based on the composition of the board and David Mathews' guarantee of the Loan from Barnett Bank. After the telephone conversation with Ms. Boyer, Rene Mathews contacted her lawyer, who is also her sister. Her attorney drew up a Shareholders Agreement which reflected an effective date of January 28, 1998, and a Guarantee and Indemnification Agreement which reflected an effective date of March 6, 1998. The two documents were not in existence either at the time MCI submitted its application to the District or at the time the District initially denied MCI's application for certification. The minutes of the meeting to incorporate MCI on January 28, 1998, neither reflect nor reference the Shareholders Agreement or the Guarantee and Indemnification Agreement. The Shareholders Agreement stated: Rene and David desire to set forth in a written agreement the understanding and agreement they made at the time of incorporation of the Corporation as to the authority of Rene to exercise all corporate powers and direct the management of the business and affairs of the Corporations.... The agreement further provided: Rene, as one of the Directors of the Corporation, shall have the sole authority to exercise all corporate powers and direct the management of the business, policy and affairs of the Corporation. This authority includes, without limitation, the control of the day-to-day operations of the Corporation. Any authority given to David as one of the Directors of the Corporation to exercise corporate powers and direct the management of the business and affairs of the Corporation, including without limitation, his voting power as a Director of the Corporation, has been transferred to Rene. It is the intention of Rene and David that the Corporation be for all intents and purposes a Minority/Woman Business Enterprise, notwithstanding any authority, rights, or powers that may be given to David by virtue of the provisions of the ByLaws of the Corporation or the provisions of the Florida Business Organization Act F.S. Chapter 607. It is understood and agreed that because this Agreement limits the discretion and powers of David as a Director, David is relieved of all liability for acts or omissions imposed by law on directors and all such liability is imposed on Rene. This Agreement shall not restrict the ability of David to sign documents on behalf of the Corporation under the authority and direction of Rene, as she may so determine from time to time. . . . The Guaranty and Indemnification Agreement stated that the agreement was "entered into as of this 6th day of March, 1998, by and between" Rene and David Mathews. The agreement dealt with their liability for the Loan from Barnett Bank and provided: Rene and David agree that Rene shall be solely liable under the Guaranties for repayment for the Loan in the event of a default. To the extent that any action is taken by Barnett Bank against David under the Guaranties, Rene shall indemnify David in any threatened, pending, or completed action, suit, or proceeding against any expenses (including attorney's fees), judgments and amounts paid in settlement, actually or reasonably incurred by him in connection with such action, suit, or proceeding, including any appeal thereof. . . . On June 19, 1998, Ms. Mathews submitted the Shareholder's Agreement and the Guaranty and Indemnification Agreement to the District. On July 31, 1998, Ms. Mathews and MCI's counsel met with representatives from the District to discuss the initial denial of MCI's application. By letter dated August 4, 1998, the District advised MCI that the information submitted after the application did not support a reversal of the District's decision to deny the application. Although the District reviewed the additional information, the District deemed the Shareholders Agreement and the Guaranty and Indemnification Agreement to be new documentation rather than clarifying information originally submitted in the application. The changes which the documents reflect occurred after the application was submitted and the notice of intent to deny certification was issued. Carolyn Williams, the Director of the Office of Supplier Diversity and Outreach at the District, explained the rationale for not allowing changes after a denial has been issued and why firms which have been denied remain ineligible to reapply for certification for one year after denial pursuant to Rule 40E-7.655, Florida Administrative Code. According to Ms. Williams, to allow MCI to change its application and essentially restructure the firm would be inconsistent with the District's past practices and would violate the integrity of the program.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that a Final Order be entered denying Mathews Consulting, Inc.'s application for certification as a M/WBE. DONE AND ENTERED this 25th day of February, 1999, in Tallahassee, Leon County, Florida. SUSAN B. KIRKLAND Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 25th day of February, 1999.

Florida Laws (2) 120.57607.0824 Florida Administrative Code (1) 40E-1.521
# 1
SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT vs EDWARD TANNER, 96-004161 (1996)
Division of Administrative Hearings, Florida Filed:Bartow, Florida Sep. 03, 1996 Number: 96-004161 Latest Update: Mar. 10, 1997

The Issue The issue for consideration in this case is whether the Department should impose administrative penalties in the form of fines, costs and points assessment because of the matters alleged in the Administrative Complaint and Order entered herein.

Findings Of Fact At All times pertinent to the issued herein, the Petitioner, SWFWMD, was the governmental agency responsible for the licensing of well contractors and the permitting of well drilling and abandonment within its jurisdictional area. Respondent, Edward Tanner, was a licensed water well contractor, holding license Number 2276 issued on July 21, 1982. On January 16, 1996, SWFWMD issued Well Construction permit 575267.01 to Respondent for the abandonment of a four-inch diameter water well on property owned by Mr. McCrimmon located at Five Tera Lane in Winter Haven. The well, a domestic water well, had failed and Respondent applied for a permit to construct a new well at the site and abandon the failed well. Stipulation Number Four of the permit issued to the Respondent provided that the well must be examined for debris or obstructions from the land surface to the original depth of construction, and further required that any debris or obstruction discovered be removed from the well prior to the commencement of abandonment. In addition, the stipulation called for the well to be plugged from bottom to top by an approved method of grouting. According to the permit, if any other method of abandonment was to be used, it must be approved in advance by specifically denoted District personnel. Though Respondent did not utilize the approved method of abandonment in this project, he did not apply for a variance from the District. Had he done so, he would have been required to show some emergency or hardship which would have prevented him from properly filling the abandoned well with cement from top to bottom and justified an alternative method of abandonment. In this case, Respondent plugged the well in issue, which was 210 feet in depth, from the land surface down to fifty five feet, utilizing six bags of portland cement. Deviation from the 210 foot plug required a variance to be granted by the District. Respondent did not seek this variance. Well abandonment is a regulated practice because, inter alia, improper abandonment may result in contamination of the aquifer. The well in question here is located in an area susceptible to contamination by ethylene dibromide, (EDB), recognized as a human carcinogen, which is known to be present in the area. In addition to failing to properly abandon the well, Respondent also failed to file a well completion report within thirty days of completion of his abandonment effort. The required report was submitted on June 10, 1996, nearly four months after it was due. Respondent relates that in January 1996, after he had worked on a well “commonly known” to be the subject of litigation, he was asked to try to fix the well in issue. When he saw the problem, he contends he repeatedly advised the authorities that the well was leaking sand and could not be cleaned out to the bottom as the District required. Therefore, to preserve the integrity of the well, he plugged it at a point below the break in the well lining. At that time, he told Mr. McCrimmon what the situation was and advised him the well needed to be abandoned, but he, Tanner, did not do that type of work. Respondent contends, supported by his son, that on January 16, 1996, while he was at Mr. McCrimmon’s property, he was told by Mr. Wheelus and Mr. Lee, both District officials, that Mr. Calandra, also a District official had said he, Tanner, had to pull a well abandonment permit or Calandra would not sign off on the new well. At that point, Respondent claims, he went to the District’s Bartow office to argue with Mr. Calandra, and asked Mr. Calandra to show him the law which supported Calandra’s position. Calandra persisted in his position and even, according to Respondent, bet with another District employees that Respondent had to do what he was told. This other employee does not recall any such bet. Therefore, under protest and only so he could get paid for the work he had done on the new well, Respondent agreed to pull the abandonment permit. At that time, he claims, he asked the District personnel in charge how many bags of concrete would be required to abandon the well and was told, “six”. When the time came to do the actual work, Respondent called for the required observer to be present from the District office, but because no one was available at the time, he was granted permission to do it without observation. He did the job as he felt it had to be done, and thirty days to the day after that, was served with the notice of violation. Respondent contends either that the witnesses for the District are lying in their denials of the coercive statements he alleges, or the situation is a conspiracy to deprive him of his civil rights. He does not believe a well contractor should be required to stay current regarding all the District rules regarding well construction and abandonment because the rules change so often. Respondent admits, however, that the rules in existence at the time in question required the filling of a well all the way down and that he did not do that nor did he seek a variance., He knew he was required to comply with the conditions of a permit. He also admits that a completion report was due within thirty days of work completion. In that regard, however, he contends that when the issue went into litigation, he felt the district would advise him of what he had to do. In this he was mistaken, but he was not misled into believing so by anything done or said by District personnel. Taken together, the evidence does not demonstrate that anyone from the District staff coerced Respondent into abandoning the well. He was issued a permit to drill the new well for Mr. McCrimmon with no conditions thereon. By the same token, the abandonment permit he obtained did require the complete clearing and total plugging of the abandoned well, and this was not done. The costs incurred by the District in the investigation and enforcement of this alleged violation totaled in excess of $500.00.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is recommended that the Southwest Florida Water Management District enter a final order finding Respondent, Edward Tanner, guilty of improperly abandoning the well in issue and failing to file the required report in a timely manner, and assessing enforcement costs in the amount of $500.00 in addition to an administrative fine of $250.00. DONE and ENTERED this 29th day of January, 1997, in Tallahassee, Florida. ARNOLD H. POLLOCK Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (904) 488-9675 SUNCOM 278-9675 Fax Filing (904) 921-6947 Filed with the Clerk of the Division of Administrative Hearings this 29th day of January, 1997. COPIES FURNISHED: Margaret M. Lytle, Esquire Southwest Florida Water Management District 2379 Broad Street Brooksville, Florida 34609-6899 Edward Tanner 1137 Saint Anne Shrine Road Lake Wales, Florida 33853 Peter G. Hubbell Executive Director Southwest Florida Water Management District 2379 Broad Street Brooksville, Florida 34609-6899

Florida Laws (1) 120.57 Florida Administrative Code (2) 40D-3.30140D-3.531
# 2
FAIRFIELD COMMUNITIES, INC. vs. FLORIDA LAND AND WATER ADJUDICATORY COMMISSION AND MONROE COUNTY, 86-004591RX (1986)
Division of Administrative Hearings, Florida Number: 86-004591RX Latest Update: Jan. 22, 1987

The Issue Whether Rule 27G-1.06(2) and Rule 27G-1.08(4), Florida Administrative Code, or either of them, is an invalid exercise of delegated legislative authority?

Findings Of Fact The parties have stipulated that Fairfield Communities, Inc. (Fairfield) has the requisite standing to challenge the rule provisions at issue and that Friends of Fort George, Inc., (Friends), Florida Wildlife Federation (FWF) and Florida Audubon Society (Audubon) have standing to participate as intervenors in support of these rule provisions. The Florida Land and Water Adjudicatory Commission (FLWAC) is the state agency that promulgated the challenged rules. The Fort George DRI case, No. 86-4127, began on August 1, 1986, when the Department of Community Affairs took an appeal of the development order entered by the City of Jacksonville on June 12, 1986 on grounds The MLUP does not accurately show or locate the DER jurisdictional line on the western side of the island from which buffer areas required by the ADO are to be measured . . . The MLUP does not properly or accurately depict or locate buffer areas surrounding the sloughs on the western side of Fort George Island. Exhibit B to the Prehearing Stipulation. Together with others, the Intervenors in the present case filed, in the Fort George DRI case, No. 86-4127, a motion to intervene as of right and request for consideration of additional issues on August 7, 1986. The intervenors in No. 86-4127 sought consideration of a wide range of issues in the Fort George DRI case, including questions concerning Blue Pond, the perimeter buffer zone, the interior habitat, weirs, berms, dikes and hydraulic connections, the adequacy of the water supply, the effect of the Game and Fresh Water Fish Commission's disapproval, the placement of various boundaries, and whether "Fairfield has failed to provide adequate protection of the microclimate and ecology of the Rollins Bird and Plant Sanctuary as mandated by the ADO . . ." Exhibit C to the Prehearing Stipulation. In filing their motion to intervene as of right and request for consideration of additional issues in No. 86-4127, Friends, Audubon and FWF expressly relied on Rule 27G-1.06, Florida Administrative Code. The portion under challenge here provides: (2) Motions to intervene filed with the Commission within 30 days of the filing of a notice of appeal may request the Commission to consider issues raised in the record below but not raised by the parties to the appeal. Rule 27G-1.06, Florida Administrative Code. In the order of transmittal, entered in No. 86-4127 on October 15, 1986, FLWAC denied consideration of every issue raised by the intervenors, except for the issue concerning the Rollins Bird and Plant Sanctuary, and added a related issue, also concerning the Rollins Bird and Plant Sanctuary, citing Rule 27G- 1.08, Florida Administrative Code. The portion of that rule under challenge here provides: Within 60 days of receipt of a notice of appeal, the Commission shall meet to review the issues raised by the parties. If the Commission determines that an issue of statewide or regional importance was not raised by the parties but is necessary to its disposition of the appeal, the Commission shall specify said issue and shall specify whether the issue shall be the subject of review based on the record made below, additional evidence or a combination thereof. New issues shall not be raised by the parties or other persons after this Commission meeting. At this meeting, the Commission may also dispose of procedural motions, including motions to intervene, which have been filed within 30 days of the filing of the notice of appeal. Rule 27G-1.08, Florida Administrative Code. Fairfield, as the applicant for the development order in No. 86- 4127, questions FLWAC's authority to promulgate rules that allow FLWAC to consider issues not raised by the party who took the DRI appeal, whether sua sponte or on motion of an intervenor.

Florida Laws (6) 120.53120.56120.57380.06380.07403.412
# 3
FLORIDA AUDUBON SOCIETY AND NATIONAL AUDUBON SOCIETY vs. SOUTH FLORIDA WATER MANAGEMENT DISTRICT (MARSH GOLF CLUB), 87-005578 (1987)
Division of Administrative Hearings, Florida Number: 87-005578 Latest Update: Aug. 29, 1988

The Issue As stated by the Hearing Officer the issue in this case is whether the District should issue a surface water management permit to Russell E. and Marilyn F. Scott, and Caloosa Television Corporation for the construction and operation of a surface water management system to serve a television signal tower and control building in Southeast Lee County, Florida. There are no significant water resource impacts related to the management of surface water by the proposed project. The harm at issue in this case is the potential for wood storks and other wading to strike the tower and guy wires which are not structures related to management and storage of waters. The parties disagree as to whether the District has jurisdiction to consider the bird impacts related to collisions with the tower and guy wires, and if so, whether the tower and guy wires will have a significant adverse impact on the water resources of the state through a reduction of wood storks, an endangered species, and other wading birds which through feeding on fish remove biomass from such water, thereby maintaining water quality. In determining jurisdiction in this case, the parties disagree on the meaning of "works" and "surface water management system" as used in Chapter 373, F.S. and Rule 40E-4, F.A.C. The petitioners argue that since one set of guy wires will be placed across one end of the cypress wetland located on the subject property, the entire project including the guy wire and tower is a "works" and part of the surface water management system, which is subject to the permitting jurisdiction of the District. The District and respondent Caloosa Television Corporation contend that the tower and guy wires are not structures related to surface water management and are not "works" nor part of the surface water management system, and therefore, bird mortality, as a result of hitting the tower and guy wires, is not subject to the permitting jurisdiction of the District. FINDINGS ON EXCEPTIONS At the Governing Board meeting of October 6, 1988, the petitioners waived Findings of Fact exceptions 1 and 2 of Petitioners' Exceptions to Finding of Fact, Conclusions of Law, and Recommended Order. Therefore, Findings of Fact exceptions 1 and 2 are rejected. The petitioners' exceptions 1, 2, and 3 to Conclusions of Law of the Recommended Order are rejected as set forth in the District's Response To Exceptions Filed by Petitioners filed on September 27, 1988, and attached hereto as Exhibit B and made part of this Final Order. The Governing Board accepts the exceptions filed by the District and the respondent, Caloosa Television Corporation, as set forth herein under Conclusions of Law.

Findings Of Fact On or about September 14, 1987, Caloosa filed Application Number 09147- B, for a surface water management permit, with the District. This application was for the construction and operation of a surface water management system to serve a 1249 foot high television transmission tower and control building in southeast Lee County, Florida. The proposed location of Caloosa's project is approximately one mile north of the boundary of the Corkscrew Swamp Sanctuary, which is owned and operated by Audubon, and specifically, approximately two and one-half miles north of a wood stork colony located within the Sanctuary. This rookery is the largest rookery of wood stork, a federally endangered wading bird, in the United States. The project site is 60 acres in size, and approximately square in shape. It is improved agricultural land, with a circular cypress wetland of about 5.5 acres located near the center of the site. Extending outward from the cypress wetland are two ditches, one running due east and the other due west. The existing surface water flow varies with the seasons and intensity of storm events. During dry seasons, the rainfall runoff flows into the cypress wetland and percolates into the ground. However, during wet seasons, water builds up in the cypress wetland and flows into the two ditches. In larger storm events, the project site is entirely under water, and sheet flows occur to the southwest. The proposed project should have a negligible impact on the existing surface water system since the total impervious area will only be approximately one acre, or 1.7 percent of the total project area of 60 acres. The project consists of a radio tower and guy wires, a 3150 square foot control building, fill pad and parking area, guy wire anchor slabs, and approximately 1650 feet of lime rock road with an equalizer culvert to maintain existing flow. Three sets of six guy wires will extend from the 1249 foot high tower and connect to the ground at anchor slabs located near the edge of the project site. The entire project is located outside of the limits of the existing wetland, but one set of guy wires does cross the western edge of the cypress wetland. Caloosa proposes to use the tower as a "community tower" which will be capable of supporting more than one transmitting antennae. In addition to Caloosa's antennae, the tower will be able to support up to five commercial radio stations and up to sixty two-way communication antennae. Caloosa has had contacts from several commercial radio stations and governmental agencies which have expressed interest in co-locating their antennae on Caloosa's tower. After review of this application, District staff advised Caloosa, on November 23, 1987, that it was recommending approval of the application since it was felt that any impact from the project on wood storks would not result from the construction and operation of this project. At hearing, the District supported the issuance of this permit, but urged that the tower and guy wires are not a part of the surface water management system over which the District has any permitting jurisdiction. Audubon timely filed its request for a hearing on the District's intent to issue this permit, and at hearing opposed the issuance of this permit to Caloosa, urging that the tower and guy wires were an integral part of the surface water management system, and therefore subject to the District's permitting jurisdiction. The wood stork and other wading birds are an important link in the biological and ecological chain. They are the main mechanism for removing certain species of fish from ponds, lakes and waters of the state. If there is no predation by wading birds, then an increase in the biomass of the water system would be expected, water quality would decrease, and fish kills would result. Ponds that receive biomass reduction by wading birds have a reduction in fish biomass of approximately 75%, with no loss in species, while ponds that do not receive wading bird predation lose almost all individual aquatic animals through reduced water quality resulting from retention of up to 94% of the biomass from dead fish. The reduction in biomass is in direct proportion to the number of birds feeding in a pond, and therefore a 5% reduction in birds will result in a 5% lessening of the biomass reduction. Water quality will be reduced by a lowering of oxygen levels in such waters due to the excessive retention of nutrient laden biomass. During the nesting season, wood storks feed in various ponds and wetland areas that surround the rookery. Their primary feeding areas are within ten miles of the rookery. The proximity of these sites allow the birds to make several flights per day between the colony and the feeding site, and to do so with less energy expended than with feeding sites that are farther away. Caloosa's project site is located between the rookery and a primary feeding area to the north that is within ten miles of the rookery. The proximity of this feeding area allows the birds to fly low, at tree top level, to the site, without the use of thermal updrafts that they use to attain altitudes of up to 5000 feet when traveling greater distances. Thus, if the tower is built, it would be likely that wood storks would fly in the direction of, and at the height of, the tower to reach this primary feeding area. However, it was not established how many such birds actually feed in this nearby area, or how many fish are in these ponds and wetlands. The wood stork colony at Corkscrew Swamp Sanctuary has been experiencing a decline in productivity from approximately 6000 nesting pairs in 1960 and 1966, there has been a steady decline in the number of nesting pairs in the colony, and in 1987, there were no nesting pairs in the colony. During 1988, 750 nesting pairs have been observed. The steady decline in the wood stork colony population is the result of already existing developmental pressures and changes in drainage patterns which have adversely affected the birds' feeding habitats. For nesting to be successful, two adult birds are required per nest during the nesting season, which usually occurs from November to March. This allows one adult bird to be away from the nest obtaining food while the other adult keeps the nest warm and safe from predators. If a nest is left unattended through the loss of one adult bird, it is likely that the entire nest will be lost since the fledglings are very vulnerable throughout the nesting season to predators and changes in temperature. There are usually two or three fledglings per nest. For this reason, the loss of five adult birds per year, for example, results in a total loss to the colony of between ten to fifteen fledglings. This loss compounds each year, as birds lost one year are not available to reproduce in following years. Generally, transmission towers can pose a hazard to birds due to the potential for collisions. Illuminating such towers at night does not decrease this danger since the birds are simply attracted to lights. Strobe lighting has also been tried, but it appears that birds ignore, or are not deterred, by strobes. In this case, Caloosa has agreed to accept conditions placed upon the approval of this project by the Lee County Board of Zoning and Adjustments on March 16, 1987, which include placement of aircraft warning balls on the guy wires and the tower itself, habitat improvement including the creation of a wetland and a wildlife through way, if necessary, and commencement of a monitoring system to identify any problems with wood stork mortality as soon as possible. A very extensive study of bird kills and transmission towers was conducted over a thirty year period involving the WCTV tower in Tallahassee, Florida. The WCTV tower was found to kill 3.9 wading birds per year on average. Based in part upon this data, the U.S. Fish and Wildlife Service concluded that wood stork collisions with the tower will not result in significant mortality, and an "incidental take" of five wood storks per year should result. This is a level of mortality which is noteworthy, since any loss to an endangered species is significant, but is clearly below that which would cause jeopardy to the species. Although Audubon correctly pointed out that the conditions present in the WCTV study do not exactly match those present in this case, such as the fact that there are almost three times as many wading birds in the area of the Caloosa tower as were in the area of the WCTV tower, as well as the differences in the geographical relationship of the tower to nearby wading bird colonies and feeding areas, nevertheless, the WCTV study is relevant and should be considered by the District since it is the most exhaustive study of its kind ever conducted. Caloosa presented evidence of a study it conducted over approximately a one month period in May and June, 1988, of a comparable existing radio tower, the WHEW tower, located near the subject property to the east. Although substantial wood stork and other wading bird activity was observed around the WHEW tower, there were no collisions of wood storks with this 1010 foot high tower. While not a scientific study in the strictest sense, and although it was not conducted for as extensive a period as the WCTV study, nevertheless, the District should consider the WHEW study conducted by Caloosa since it involves a comparable tower in close proximity to the subject property, and the person who conducted the study for Caloosa and who testified at hearing, Robert E. Gatton, appeared particularly credible. The Federal Communications Commission has approved the location of Caloosa's tower. I5. The Florida Game and Fresh Water Fish Commission has recommended that the proposed location for Caloosa's tower be changed to an alternate site which would present a less serious obstacle to the Corkscrew wood stork nesting colony and other wading birds. This recommendation is based on the policy that the mortality of even one wood stork is too much and may present a danger to the population of the wood stork rookery. It was not shown, however, that a basis in fact exists for concluding that the loss of five or fewer wood storks per year would present such a danger. The Commission's recommendation is also based upon a concern that transmission towers will proliferate in the area, and thereby further interfere with the flight paths of wood storks and other wading birds to their feeding locations. However, the fact that Caloosa is seeking to construct a "community tower" to be shared with several governmental agencies, as well as broadcasting stations, will actually serve to decrease this potential proliferation. While there is a potential for wood storks or other wading birds in the area to be killed or injured by striking Caloosa's tower or the guy wires while in flight, the extent of this danger is speculative, but would not appear to exceed five wood storks per year. Under these circumstances, there would not be a significant threat to the population, or continued viability, of the Corkscrew rookery. It has not been shown, by the evidence in this record, that any loss of wood storks and other wading birds caused by this project will result in fish kills through a significant reduction of predation and the resulting failure to remove accumulated biomass in ponds and waters in the area. It was not demonstrated that a fish kill will, or is even likely, to occur. While the loss of five wood storks would result in a certain amount of biomass not being removed from the area's wetlands, nothing in the record suggests that this amount will have an adverse impact on the state's water resources or will otherwise be significant. Therefore, any relationship between the tower proposed by Caloosa and impacts associated with biomass accumulation is purely speculative and de minimis. Fish kills occur naturally as water levels in seasonal marshes and ponds lower in the dry season. The water quality impact of such kills is relatively short-lived, lasting up to two months or until the next wet season begins, at which time water quality parameters return to normal. The evidence produced at hearing does not establish that the project and its surface water management system will have any significant or measurable effect on drainage of surface water runoff from the subject property, or on adjacent properties. The drainage system proposed by Caloosa will utilize the existing ditches and the natural cypress pond on the property. It was established that the post-construction effect of the project on drainage would be insignificant. There are, therefore, no drainage impacts associated with this project.

Recommendation Based upon the foregoing, it is recommended that the District enter a Final Order approving Caloosa's application for surface water management permit number 09147-B, subject to the conditions, agreed to by Caloosa, which were imposed by the Lee County Board of Zoning and Adjustment in its approval of this proposed development. DONE AND ENTERED this 29th day of August, 1988, in Tallahassee, Leon County, Florida. DONALD D. CONN Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 29th day of August, 1988. APPENDIX TO RECOMMENDED ORDER, CASE NO. 88-5578 Rulings on Audubon's Proposed Findings of Fact: 1. Adopted in Findings of Fact 1, 3. 2-3. Adopted in Finding of Fact 4, but otherwise Rejected as a conclusion of law rather than a finding of fact. 4-5. Adopted in Finding of Fact 5, but otherwise Rejected as unnecessary, irrelevant and as a summation of testimony. 6. Adopted in Finding of Fact 2. 7-8. Adopted in Finding of Fact 7. 9-10 Adopted in Finding of Fact 8. 11. Adopted in Finding of Fact 11. 12-15. Adopted and Rejected, in part, in Finding of Fact 12. Adopted in Findings of Fact 8, 10, but otherwise Rejected as irrelevant and unnecessary. Adopted in Finding of Fact 9. Adopted in Findings of Fact 10, 12, but otherwise Rejected as cumulative and as argument on the evidence. Rejected in Finding of Fact 13, and otherwise as simply a summation of the testimony and argument on the evidence. 20-21. Adopted in Finding of Fact 6. 22-23. Rejected in Findings of Fact 15-17. 24. Adopted in Finding of Fact 15. Rulings on Caloosa's Proposed Findings of Fact: Adopted in Findings of Fact 1, 2. Adopted in Finding of Fact 4. Adopted in Finding of Fact 13. Adopted in Finding of Fact 1. Adopted In Finding of Fact 5. Adopted in Finding of Fact 19. Adopted in Finding of Fact 5, but otherwise Rejected as a conclusion of law and as simply a summation of testimony. Adopted in Finding of Fact 16. 9-10. Adopted in Finding of Fact 12. Adopted in Findings of Fact 12, 13. Adopted in Finding of Fact 11. Adopted in Findings of Fact 4, 15. Adopted in Finding of Fact 6. 15-16. Adopted in Finding of Fact 17. 17. Adopted in Finding of Fact 18, but otherwise Rejected as irrelevant and as cumulative. Rulings on the District's Proposed Findings of Fact: 1-2. Adopted in Finding-of Fact I. 3. Adopted in Finding of Fact 2. 4-5. Adopted in Finding of Fact 3. Adopted in Finding of Fact 4. Adopted in Finding of Fact 3. Adopted in Finding of Fact 8. Adopted in Findings of Fact 12, 14, 16. Adopted in Finding of Fact 12. 11. Adopted in Finding of Fact 13. 12. Adopted in Finding of Fact 16. 13. Adopted in Finding of Fact 15. 14. Adopted in Finding of Fact 11. 15. Rejected as irrelevant. 16. Adopted in Finding of Fact 11. 17. Adopted in Finding of Fact 6. 18-19. Adopted in Finding of Fact 5. COPIES FURNISHED: Charles Lee Senior Vice President Florida Audubon Society 1101 Audubon Way Maitland, Florida 32751 Russell P. Schropp, Esquire Post Office Box 280 Fort Myers, Florida 33902 James K. Sturgis, Esquire Post Office Box 24680 West Palm Beach, Florida 33416 John R. Wodraska Executive Director South Florida Water Management District Post Office Box 24680 West Palm Beach, Florida 33416 =================================================================

Florida Laws (4) 120.57373.016373.403373.413 Florida Administrative Code (2) 40E-4.02140E-4.301
# 4
ALLIGATOR LAKE CHAIN HOMEOWNERS ASSOCIATION vs. MELVIN AND MARY THAYER AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 84-004491 (1984)
Division of Administrative Hearings, Florida Number: 84-004491 Latest Update: Jan. 15, 1986

Findings Of Fact The Applicant/Respondents, Melvin and Mary Thayer have applied to the Department of Environmental Regulation (Department) for a "dredge and fill permit" seeking authorization to remove an existing 32-foot wooden fence and install in its place a chain-link fence, which as originally applied for would not extend more than 32 feet waterward from the 64-foot mean sea level elevation of Alligator Lake as marked by the waterward end of the existing wooden fence. The fence proposed would be five feet high and would possess a gate at its landward end which would permit pedestrian passage in both directions around the near-shore area of the lake. The project site is located approximately 400 feet south of U.S. 441-192 and adjacent to Alligator Lake, lying one mile west from Bay Lake within Section 10, Township 26 South, Range 31 East in Osceola County, Florida. As clarified and amended prior to hearing, the application now requests the permit to authorize, instead, a 26-foot fence extending that distance waterward from the 64-foot mean sea level elevation. The Department has permitting jurisdiction under Chapters 253 and 403, Florida Statutes as well as Chapter 17-4, Florida Administrative Code. There is no dispute that the Department has jurisdiction of the permitting of the subject fence inasmuch as the fence would be constructed waterward of the 64-foot mean sea level elevation or the "high pool" level of Alligator Lake in Class III waters of the state. Additionally, the area of the project waterward of the 64- foot mean sea level elevation lies on sovereign lands of the State of Florida under the jurisdiction of the Department of Natural Resources. That Department, as yet, has not issued a permit for use of sovereign land for the intended purpose as envisioned by Section 253.77, Florida Statutes. Ed Edmunson was tendered by both Respondents as an expert witness and was accepted as to his expertise in biological assessment of dredge and fill construction projects. It was thus established that the construction and installation of the fence and removal of the existing fence would cause no Class III water quality violations. Additionally, it was established that no navigational impediment would result from the fence as presently proposed which only involves a 26-foot fence extending from the 64-foot mean sea level elevation waterward in a perpendicular direction from the shore and near-shore of Alligator Lake. Parenthetically it should be noted that the original proposal involved extending the fence 32-feet waterward and then installing a right angle section parallel to the shoreline for an indeterminate distance. The right angle portion of the fence has been deleted from the permit application and the portion perpendicular to the shoreline has been amended from 32 feet down to 26 feet from the 64-foot mean sea level elevation. In that connection, it was established by witness Walter, accepted as an expert in the field of engineering, that on January 7, 1985, the water line of Alligator Lake was at 62.4 feet mean sea level elevation and the end of the existing 32-foot wooden fence was 16 feet from the then existing waterline of the lake. If the water in the lake was at the 64 feet mean sea level elevation or "high pool" stage, which has occurred on the average of once every three years, the water at the end of the fence would still be only .9 feet in depth at the waterward extreme end of the proposed 26-foot fence. Indeed, it was established with- out contradiction by the Applicant, Melvin Thayer, that in the 17 or 18 years he has observed the project site, that only "seven or eight inches of water is the most depth he has seen at the end of the fence." Thus, the fence as proposed to be installed, will pose no impediment or hazard to the navigation of fishing boats, skiing boats or other craft, and, in that regard, a dock in close proximity to the site of the proposed fence extends approximately 90 feet waterward at the present time. In view of the Petitioner's other objection to the fence concerning their feared loss of access to walk around the near-shore area of the lake to visit friends and the like, the permit applicants have agreed to install a gate for public access anywhere specified by the Department along the extent of the proposed fence. The testimony of Petitioner's witnesses, including a representative of the Game and Fresh Water Fish Commission, consists largely of objections to the precedent of permitting a private fence to be constructed in the waters of the state and on state water bodies, but no impediment to navigation has been established especially since the neighboring dock and numerous other docks around the shoreline of the lake extend waterward much farther than will the proposed fence. No degradation to water quality has been established to result from the proposed project. The fence has not been shown to be contrary to the public interest since it will not interfere with wildlife habitat or natural resources, nor impede navigation in any way, and was shown not to impede any public use of the lake or the near-shore area of the lake, in view of the access gate to be provided in the fence. In short, reasonable assurances have been provided that all permitting criteria within the Department's jurisdiction at issue in this proceeding will be complied with, although a permit from the Department of Natural Resources authorizing use of the state lands involved has not been issued as yet.

Recommendation Having considered the foregoing Findings of Fact, Conclusions of Law, the evidence of record and the pleadings and arguments of the parties, it is, therefore RECOMMENDED: That the application of Melvin and Mary Thayer for authority to remove an existing fence and to install a fence extending 26 feet waterward of the 64-foot mean sea level elevation of Alligator Lake with an attendant public access gate installed therein be GRANTED upon satisfaction of the above-stated condition. DONE and ENTERED this 15th day of January, 1986 in Tallahassee, Florida. P. MICHAEL RUFF Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 15th day of January, 1986. COPIES FURNISHED: Virginia M. Hoover, MSM Consultant 5366 East Space Coast Parkway St. Cloud, Florida 32769 Norman J. Smith, Esquire Post Office Drawer 1549 Kissimmee, Florida 32741 B. J. Owens, Esquire Assistant General Counsel Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32301 Victoria Tschinkel, Secretary Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32301

Florida Laws (4) 120.57253.77403.0876.10
# 5
WILLIAM B. SWAIM vs FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION, 15-000091RU (2015)
Division of Administrative Hearings, Florida Filed:West Palm Beach, Florida Jan. 08, 2015 Number: 15-000091RU Latest Update: Jan. 27, 2015
Florida Laws (3) 120.52120.54120.68
# 7
DEPARTMENT OF ENVIRONMENTAL REGULATION vs. COMMUNITIES FINANCIAL CORPORATION, ET AL., 79-001560 (1979)
Division of Administrative Hearings, Florida Number: 79-001560 Latest Update: May 14, 1980

Findings Of Fact Respondent Communities Financial Corporation is a Florida corporation engaged in the subdivision and sale of real property. In 1971 CFC purchased approximately twenty-two sections, or 22 square miles, of real property ("the land") in Township 34 South, Range 33 East, Okeechobee County, Florida, which it proposed to sell as individual one-and-one-quarter (1-1/4) acre lots. The subsequent development of that land is the subject of this proceeding. Respondent Coquina Water Management District ("Coquina") was organized pursuant to Chapter 298, Florida Statutes, by judgment of the Circuit Court for Okeechobee County, Florida to perform drainage activities on the land. The land which CFC purchased in 1971 was originally platted in 1912 in a grid system with roads, drainage canals, and ditches. Extensive drainage was required for use of the land because it was very flat and had a high water table. Approximately one-half of the land was subject to flooding. After it was originally platted it was utilized for cattle ranching with drainage ditches connecting the low areas to encourage runoff. Ten-acre tracts surrounded by dikes and two to three foot deep ditches were used for tomato farming. Such agricultural ditching covered approximately 15 square miles of the property. At one time a hotel was situated on a portion of the property. North-South and East-West roads and a 5,000-foot airstrip were constructed across the property. The East-West road along the South boundary of the property, which is now a state road, has an adjacent drainage ditch which received ranchland water runoff from property east of the land. In 1971 and 1972 CFC registered the platted lots for sale with the Division of Florida Land Sales and Condominiums ("Land Sales") of the State of Florida Department of Business Regulation. In the normal course of compiling the documentation to be submitted for registration, CFC contacted several state regulatory agencies to determine whether such agencies required CFC to obtain permits for development of the property. CFC provided those agencies copies of its drainage plans, which included roads, swales, canals, and control structures. The State of Florida Department of Natural Resources ("DNR") stated that the construction of improvements as planned in the development would not be subject to that agency's jurisdiction for purposes of a dredge and/or fill permit. The State of Florida Department of Pollution Control ("DPC"), predecessor of DER, first stated in a letter of October 4, 1971, to Mr. Moseley Collins, who submitted a "plan of reclamation to DPC, that it had no regulatory responsibilities over the project: In response to your request for comments this Department has conducted a preliminary review of the proposed plan. We have no basic objections to the overall plan of development and believe it could be platted as shown. Specific details as to drainage techniques will be reviewed at a latter [sic] date. It is brought to you [sic] attention that although we have no regulatory responsibili- ties in this area we will welcome the opportunity to review cross sections and details at a latter [sic] date. We thank you for the opportunity to review a project of this magnitude at an early date. [Emphasis added.] The DPC, in a letter of March 30, 1972, to Collins, also observed that: This Department has conducted a review of the revised plan for the subject project and endorse the approach that you are contemplating in developing these areas. I have coordinated with other agencies and organizations and they concur with the approach. We would like to review the project at a future date to deter- mine the method of construction of the swales or greenways to move the water from one lake to another through the complete watershed area. You and your client are to be commended on this approach. From the preliminary layout you can see the possibilities for the potential develop- ment of an area for residential usage that will retain a large percentage of the natural resources and minimize the downstream effect on the overall watershed. Please advise when you want to review the project in greater detail. [Emphasis added.] In connection with the registration of the development, CFC submitted to Land Sales the above-referenced letters from DNR and DPC, detailed evidence of the proposed plan of development, and a public offering statement for use in solicitation of lot sales from the general public. Each offering statement contains several statements to the effect that "this is not a homesite subdivision." Land Sales approved use of the offering statement. In using it to solicit sales, CFC committed to the purchasers that it would complete the required road and drainage improvements by December 31, 1979. CFC commenced sales of lots in the development in 1971. The Agreements for Deed approved by Land Sales and subsequently entered into by CFC with lot purchasers required CFC to deliver improved lots by December 31, 1979. Most of the land sales were made between 1971 and 1973. (6,412 lots were sold and 1,146 were conveyed by June 23, 1977.) Approximately eighty percent of the lots have been sold to date. Up to one-half of the approximately nine thousand lot purchasers hold legal title to their lots pursuant to deeds issued to them by CFC upon full payment. CFC began construction of the promised improvements, consisting of roads and drainage, in 1972. At the present time approximately $1,000,000 of improvements have been completed and approximately $750,000 remain to be completed. In 1973 or 1974, CFC and Coquina submitted plans for the surface water management system which CFC proposed to construct for the property to the South Florida Water Management District ("SFWMD"). The initial plan of development called for the construction of a road and canal system. At the request of SFWMD, the plan was subsequently changed to a road and swale system, and the configuration of one of the control structures was changed. The design changes resulted in more water retention on the property and the preservation of sensitive areas. After several years of analysis and review of the design plan, inspection of the project site, and a public hearing, SFWMD granted conceptual approval for the surface water management system to be constructed by CFC in 1977. The conceptual approval was partially based on the SFWMD staff's assessment than pollutant loadings from the property after development would be less than existing loadings, and that adverse water quality impacts as a result of the proposed development were unlikely. The 1977 SFWMD conceptual approval of the drainage plan for the development was followed by the issuance of a construction permit for the westernmost seven sections on March 15, 1979. Throughout this period construction was continuing. The drainage system as approved consists of grassed lot, roadside, and collector "swales" together with a retention area comprised of natural wetlands in the area of the property known as Ash Slough. The volume of water leaving the property after development will be the same as that leaving the property before development. The drainage conveyances are designed with gradually sloping sides, vary to widths of over 100 feet for the larger collector conveyances, and have depths varying from 2 feet for the "lateral" swales to 3 feet for the larger collector swales. The groundwater table in the area of the project site varies from zero to approximately 30 inches below ground surface. The swales were designed at the request of SFWMD in lieu of the canals proposed within the same easements in the original drainage plan for the development. It appears from the evidence that these drainage conveyances are designed so as to contain contiguous areas of standing or flowing water only following the occurrence of rainfall or flooding. Although some testimony indicated that these conveyances contained contiguous areas of standing water, these observations were made either at isolated times during the progress of construction or soon after a major hurricane passed through the area. Since the purpose of the "swales" is to facilitate drainage from the property, it would appear necessary from an engineering viewpoint to allow some period of time after construction of the swales for them to stabilize to make a valid determination that they will not function as designed. Accordingly, it would not appear unusual that the swales contain areas of standing water until they have been given ample opportunity to stabilize. On the basis of the record in this proceeding, a determination simply cannot be made at this point in time that the swales will not function as designed. Following DPC's initial determination of no jurisdiction in 1971 and 1972, it and DER, its successor agency, were not involved with the project until 1974, when DPC received an inquiry concerning land sales matters from the U.S. Department of Housing and Urban Development. In 1975, a DER staff member conducted a critical review of the Project and filed an internal memorandum faulting the project on the same essential grounds that are the basis for the Notice of Violation issued June 1, 1979. DER representatives participated in various SFWMD meetings from 1975 to 1977 when the conceptual approval of the drainage plan for the project was discussed. During this period, SFWMD forwarded copies of various materials dealing with the project to DER. Further, a DER representative attended the public hearing on September 8, 1977, when the conceptual approval of the project was granted by SFWMD. Respondents' first indication of DER's renewed interest in the development was a letter from DER Subdistrict Manager Warren Strahm to Robert Birenbaum on June 23, 1977. This letter stated, in part, that: The above referenced application/staff report has been supplied to this office by the South Florida Water Management District (SFWMD). It has been determined that your project is subject to Chapters 403 and/or 253, Florida Statutes. A review of drainage plans by our staff indicates the referenced project will comply with Chapter 403, Florida Statutes permit requirements for pollutant discharge. Since these plans have been incorporated into the SFWMD permit, no discharge permit or monitoring in addition to SFWMD permit requirement will be required by the Department at this time. It appears, however, that the referenced project may fall within the permitting requirements set forth in Chapter 17-4, Florida Administrative Code. Pursuant to F.A.C. 17-4.28(2) should any excavation take place in submerged lands or within the transitional zone of submerged lands, dredge and fill permits will be required by this Department prior to commencement of said activi- ties. [Emphasis added.] Please contact Mr. Roger G. Gallop, at the Fort Pierce Branch Office, telephone (305) 464-8525, at your convenience in order to discuss the need for a construction dredge and fill permit. Thank you for your cooperation. Three months later, in a letter from James Brindell to Coquina, Respondents were notified that: A review, by this agency, of the plans associated with your Surface Water Management Permit Applica- tion No. 02187-A indicates that permits will be required from the Department of Environmental Regulation pursuant to Chapter 403 and/or Chapter 253, Florida Statutes for the construction con- templated. Specifically, permits will be required for the construction and operation of discharge structures as well as for any dredging and/or filling in the waters of the state including the submerged lands and transitional zone of these submerged lands. Additionally, certification pursuant to section 401 of F.L. 92-500 may be required. Formal or conceptual appova1 of your project by the South Florida Water Management District does not imply that your project will satisfy the requirements of this agency. Please contact Mr. Warren G. Strahm, Subdistrict Manager, 3301 Gun Club Road, West Palm Beach, phone 305/689-5800, at your earliest convenience concerning application for these permits. (Emphasis added). This letter was followed one-and-one-half months later by a "Letter of Notice" from DER advising Respondents that DER had reason to believe the project was in violation of Chapter 403, Florida Statutes, and requesting CFC to cease any further work. Throughout this series of correspondence, CFC and Coquina maintained that DER did not have permit jurisdiction. This position was reasserted in a letter of November 1, 1977, from Emerson Allsworth, counsel for Coquina, to DER. During this period, numerous meetings were held involving representatives of Respondents and DER in which Respondents were urged by DER to apply for permits. Respondents failed to do so, and, on June 1, 1979, DER issued its Notice of Violation. Natural drainage from the property occurs southwestward into an area known as Ash Slough; southward from the central portion of the property into Gore Slough; and from the northeast section of the property into Company Slough. The headwaters of both Ash Slough and Gore Slough originate on the project site and periodically extend off Respondents' property to the south to join the waters of Chandler Slough. Chandler Slough, in turn, eventually empties into Lake Okeechobee 11 to 15 miles from the property. Company Slough also extends off the project site eastward onto the lands of others. There is, however, insufficient evidence in this record from which to conclude that Company Slough regularly exchanges flow with any other body of water. A "slough", as that term is used in the context of this proceeding, is a surface conveyance pathway for waters whose lateral boundaries are not as well-defined as a stream bed, and whose rate of flow is relatively slow. Due to the flat topography of the project site, Ash, Gore and Company Sloughs have imprecise boundaries, and their rates of flow appear to range at various times from very slow to nonexistent. By Cease and Desist Order dated March 28, 1978, the United States Army Corps of Engineers required Respondents to halt any further work then being conducted on the project, asserting that work in progress at that time was being conducted in waters of the United States, including adjacent wetlands, without first having acquired a permit from the Corps of Engineers. This Order provided, in part, that: Section 301(a) of the [Federal Water Pollution Control Act Amendments of 1972] makes it unlawful to discharge dredged or fill material into waters of the United States unless author- ized by a Section 404 permit issued by the Secretary of the Army acting through the Chief of Engineers. Section 10 of the River and Harbor Act of 1899 prohibits the excavation or depositing of material or erecting any struc- tures in navigable waters of the United States unless authorized by a Department of the Army permit. The work referred to in the paragraph above is deemed to have occurred in waters subject to these statutory requirements without the requisite permits and is considered unlaw- ful by this office. Prior to 25 July, the Corps of Engineers limited the requirement for Section 404 type permits to areas either below the mean high water line in tidal areas or below the ordinary high water line of rivers and streams which either now sup- port, had supported, or were capable of supporting interstate commerce. However, on 25 July 1975, the regulatory juris- diction of the District was expanded to all waters of the United States and adjacent wetlands. [Emphasis add.] Subsequently, however, by memorandum dated May 17, 1978, the United States Army Corps of Engineers determined that it did not have jurisdiction over Respondent's activities for the following reasons: In the northeast and eastern portion of the tract the flagponds and saw grass prairies are isolated with no discernible drainage sloughs or patterns. The other area of concern, in the south west sector, contains isolated ponds and an old man-made drainage canal that comprises shallow, intermittent potholes above the natural headwaters of Ash and Gore Sloughs. There was no recognizable flow in any part of the canal and the point at which average annual flow appear to be 5 c.f.s. or greater is located to the south a considerable distance from the subject tract. The project, as proposed, will not destroy or threaten any endangered species or their habitat nor adversely impact water quality of the ultimate receiving waters in Kissimmee River and Lake Okeechobee. In 1971, the Soil Conservation Service of the United States Department of Agriculture classified Ash and Gore Sloughs, as well as Fish Slough, to which Company Slough is alleged by DER to connect, as "intermittent". This determination is supported by hydrological data compiled by the South Florida Water Management District which shows no net flow in Chandler Slough for as many as six months in 1975 and four months in 1976. In the South Florida Water Management District report concerning flow patterns in Chandler Slough, it was pointed out that: The climate in this portion of Florida is subtropical with warm summers and moderate winters. Rainfall is seasonal with about 75 percent of the total occur- ring in a well-defined wet season, from May to October. This distribution of rainfall results in considerable surface water flow during part of the year. During the late winter and early spring many of the creeks and sloughs, such as Chandler Slough, become completely dry. [Emphasis added.] In addition, testimony in the record in this proceeding establishes that on at least one occasion during the time in which construction on the property was being conducted, Company Slough was completely dry. There is no data in the record quantifying the annual flow of water from Ash and Gore Sloughs into Chandler Slough. Further, there is no evidence concerning the periodicity of any such water exchanges between Ash and Gore Sloughs and Chandler Slough. As indicated above, the evidence establishes that Chandler Slough, which is the larger collector slough into which both Ash and Gore sloughs allegedly discharge, periodically becomes "completely dry." DER witnesses testified that they had observed contiguous areas of standing water in Ash, Gore and Company Sloughs during visits to the site, and had also determined the existence of an exchange of waters between Ash, Gore and Company Sloughs with other sloughs connecting to Chandler Slough by analyzing aerial photographs. However, those aerial photographs were not made a part of the record in this proceeding. Additionally, the relatively few visits to the site by these witnesses, in the absence of validly derived data establishing pertinent flow rates, is insufficient to establish "normal" conditions in the area. This is especially true in light of the aforementioned countervailing determinations based upon data compiled by the United States Army Corps of Engineers, the United States Department of Agriculture and the South Florida Water Management District. The evidence shows that some of the types of vegetation listed in DER's vegetation indices by which DER determines whether areas are "submerged lands" or "transitional zones" of submerged lands have been found on the project site. Among the types of vegetation observed in and around Ash, Gore and Company Sloughs are maidencane, water willow, pickerelweed, button bush, saw grass and St. John's wort. Although these species were detected in some locations by visual observation, apparently no attempt was made to quantify these plants vis-a-vis other vegetative types, nor were any physical measurements made to locate their boundaries. In a report dated August 26, 1977, the SFWMD attempted to identify the acreage, but not boundaries, of wetlands on the development site. The findings of that report show that approximately 2,014 of 14,080 acres, or 14.3 percent of the total site, contains wetlands vegetation. The report also indicates that the wetlands vegetation is scattered in different locations over the site, with the median occurrence being 68 acres per 640-acre section. DER presented quantified evidence showing turbidity readings in the Ash Slough area of the development during the construction of swales in August, 1979, of 325 Jackson Units and November and December, 1979, of 155 and 176 Jackson Units, respectively. It should be noted that these readings were performed after the filing of the Notice of Violation herein. Although samples of August 6, 1979, were taken without a background sample in Ash Slough, the evidence establishes that background readings in Ash Slough were less than 25 Jackson Units. The evidence clearly establishes that DER's water quality sampling and analysis were conducted in accordance with applicable requirements of Chapter 17, Florida Administrative Code. The evidence establishes that these readings are attributable to construction of swales and control structures and would not be expected to continue after completion of construction. There is no evidence to show the duration of the discharges resulting in these turbidity readings, nor is there any showing of actual damage to animal, plant or aquatic life. Petitioner and Respondent have submitted proposed findings of fact in this proceeding. To the extent that those findings of fact are not adopted in this Recommended Order, they have been specifically rejected as being either irrelevant to the issues in this cause, or as not having been supported by the evidence.

Florida Laws (12) 120.57380.06380.12403.031403.061403.062403.087403.088403.121403.161403.803403.813
# 9
SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT vs AMBER SUGGS, 03-000788 (2003)
Division of Administrative Hearings, Florida Filed:Bushnell, Florida Mar. 05, 2003 Number: 03-000788 Latest Update: Jul. 06, 2024
# 10