PROCACCI FINANCIAL GROUP, LTD., AND PROCACCI COMMERCIAL REALTY, INC. vs DEPARTMENT OF LABOR AND EMPLOYMENT SECURITY, 92-002650BID (1992)
Division of Administrative Hearings, Florida Filed:Fort Lauderdale, Florida Apr. 28, 1992 Number: 92-002650BID Latest Update: Oct. 27, 1992

The Issue Whether Respondent's rejection of all bids for Lease No. 540:0920 was improper.

Findings Of Fact The Respondent published an invitation to bid seeking to lease approximately 9,907 net square feet of office space in Broward County (the Lease). There was no evidence of any irregularities in the preparation or the issuance of the invitation. The Petitioner, whose responsive bid was rejected by Respondent, timely and properly brought its protest and has standing to protest the Respondent's rejection of all bids for the Lease. Lynn Mobley was the statewide lease manager of the Respondent and had the responsibility to generally oversee the preparation of the bid package and the bid opening procedures. Barbara Lollie was a staff member under the supervision of Ms. Mobley and was in charge of the preparation of the request for bid proposals. Ms. Mobley's supervisor was a Ms. Barron. Five bids in response to the invitation to bid were duly received by Respondent. An evaluation committee chaired by Don Walker, Respondent's area administrator, was appointed to inspect the proposed properties and to evaluate the bids. The evaluation committee ranked the bids in the following order of preference: 1/ 1. In-Rel ($499,141.80) 2. Taft ($519,090.30) 3. Donlon ($541,119.90) 4. Procacci ($618,373.30) 5. Stirlingwood ($761,906.30) Thereafter the responses to the invitation were forwarded to Ms. Mobley's office for evaluation. Ms. Mobley's staff determined that the top two bids, those of In-Rel and Taft, were non-responsive. 2/ Ms. Mobley, who did not actively participate in the evaluation of the proposals, then advised Mr. Walker of that determination and advised him of two alternatives: to award the bid to the lowest responsive bidder or to reject all bids and re-advertise. The evaluation committee chaired by Mr. Walker had wanted to lease the property to either In-Rel or Taft. Mr. Walker told Ms. Mobley that he wanted to reject all bids and to re-advertise. Pursuant to the request for bids promulgated by the Respondent and Rule 13M-1.015, Florida Administrative Code, the Respondent reserved the right to reject any and all bid proposals for the Lease. The request for proposal of bids specifically stated: The Department reserves the right to reject any and all bid proposals for reasons which shall include but not be limited to the agency's budgetary constraints; waive any minor informality or technicality in bids, to accept that bid deemed to be the lowest and in the best interest of the State, and if necessary, to reinstate procedures for soliciting competitive proposals. Following the telephone conversation between Mr. Walker and Ms. Mobley, Ms. Mobley sent a letter dated March 23, 1992, to all bidders which notified each bidder that all bids had been rejected. That letter did not state the reasons for the rejection of all bids. Mr. Walker sent a memo on March 20, 1992, to Ms. Lollie recommending the rejection of all bids. Although this memo predated the rejection letter and was subsequently made available to Ms. Mobley, the memo was received by Ms. Mobley's office after the rejection letter had been sent. The memo gave no explication of Mr. Walker's reasons for wanting to reject all bids. The Department of General Services (DGS) published lease rate guidelines for Broward County to inform the Respondent of maximum acceptable lease rates. The purpose of these DGS guidelines was to advise the Respondent that proposed lease rates above the guidelines would be summarily rejected. At the time of obtaining bid proposals, the DGS lease rate guidelines were the only established guidelines which could be consulted by the Respondent. At no time did the Respondent calculate a pre-bid estimate of what the Respondent felt was an acceptable range of lease rates in order to be used in determining whether lease rates were too high. The Petitioner's bid, along with the other responsive bidders, were within the DGS lease rate guidelines. Mr. Walker made the request for re-bid after he learned that the bids of Taft and In-Rel were non-responsive. Mr. Walker's decision to recommend the rejection of all bids was based only on the information that the two top choices of the evaluation committee had been found to be non-responsive and on his desire to reopen the bid process in the hope of attracting more bidders. 3/ Mr. Walker wanted to modify the specifications of the invitation to bid in two regards. First, he wanted to amend the specifications to permit the leased premises to be in more than one building. Second, he wanted the geographical boundaries in which the leased premises could be located to be expanded to hopefully attract additional bidders. Mr. Walker believed that a re-bid would provide a wider range of buildings at comparable prices from which to choose and would give him an opportunity to make changes to the bid specifications. His decision to recommend the rejection of all bids was not based on a lease bid analysis or on lease rate guidelines. The recommendation was not dictated by budgetary considerations, but by his desire to shop the bid. It was Mr. Walker's understanding that at the end of his telephone conversation with Ms. Mobley that the decision to reject all bids had been made and that all bids would be rejected. Ms. Mobley made the decision to reject all bids pursuant to the recommendation of Mr. Walker after obtaining input from Ms. Lollie and Ms. Barron. Although Ms. Mobley had Ms. Lollie's analysis of the five bids, that analysis made no comparison of the rates contained in the bids with existing lease rates or the DGS guidelines. Ms. Mobley did not consult the DGS lease rate guidelines, although she was generally familiar with those guidelines, and she was unaware of any budgetary constraints that would dictate the rejection of all bids. When Ms. Mobley decided to reject all bids, she did not compare the bid proposals to the existing lease rates paid by the Respondent for leased office space in Broward County. The decision to reject all bids was not made on the advice of an attorney. Although Ms. Mobley testified that all bids on the Lease were rejected solely for price considerations, the evidence presented established that the decision to reject all bids was not based on price, price guidelines, or the Respondent's budgeting constraints. The greater weight of the evidence establishes that Ms. Mobley rejected all bids because that was the action recommended by Mr. Walker. Respondent's invitation to bid did not contain any lease rate guidelines that would notify prospective bidders of a lease rate ceiling. There was no significant difference in the lease rates between the Taft and In-Rel bids that were favored but non-responsive and the third lowest bidder, the Donlon bid, which was responsive but rejected. Mr. Walker conceded that the Donlon bid was not rejected because of price considerations. Mr. Walker was of the opinion that the Donlon bid was at an acceptable price. He did not testify that the Petitioner's bid was at an unacceptable price and he did not testify as to what, other than the DGS guidelines, would be the maximum acceptable price. The DGS Lease Guidelines applicable to the bid for the Lease were as follows: A full service Lease (including electricity) -- $17.84 a square foot. 4/ Lease without electricity -- $15.18 a square foot. The present rate for the existing lease which was to be replaced by the Lease was $16.60 a square foot; this rate did not include electricity. If electricity was factored in at $2.50 a square foot, which was a factor regularly used by DGS, the present lease rate would be approximately $18.00 a square foot. The three responsive bids to the invitation were lower than the present lease after factoring in electricity. Ms. Goodman was of the opinion that Respondent's budget with respect to the Lease would be based on lease rates already in existence and consequently, that the responsive bids received and rejected were within the budget guidelines. Respondent offered no evidence to controvert that opinion. There was no evidence that the decision to reject all bids was based on economic considerations. All lease rates submitted by the rejected bidders were under the ceiling set by the DGS lease guidelines of $17.84. The Respondent acted arbitrarily when it rejected all bids.

Recommendation Based upon the foregoing findings of fact and conclusion of law, it is hereby recommended that the Respondent accept and evaluate the responsive bids submitted for the Lease and determine the proper recipient for an award of the Lease. RECOMMENDED this 29th day of June, 1992, in Tallahassee, Leon County, Florida. CLAUDE B. ARRINGTON Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 29th day of June, 1992.

Florida Laws (4) 120.57120.68255.25287.012
# 1
ROBERT COOK, SARA COOK, AND ALAN TAYLOR vs DEPARTMENT OF JUVENILE JUSTICE, 98-001641BID (1998)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Apr. 09, 1998 Number: 98-001641BID Latest Update: Aug. 10, 1998

The Issue Whether the Department of Juvenile Justice's (Respondent) decision to reject all bids is illegal, arbitrary, dishonest or fraudulent and should be rejected.

Findings Of Fact Petitioners Robert and Sara Cook own a building located at 205 Gus Hipp Boulevard, Rockledge, Florida. The address for Petitioners Robert and Sara Cook is 1950 Murrell Road, Rockledge, Florida. Petitioner Alan Taylor is an agent for Petitioners Robert and Sara Cook, and assisted the Cooks in the preparation and submittal of their Response to the Department's Request for Proposals for Lease Number: 800:0176-COCOA. Respondent, Florida Department of Juvenile Justice, is the state agency that issued the Request for Proposals for Lease Number: 800:0176-COCOA. Intervenor, 11 Riverside Corp., is the bidder to whom the Respondent issued an award letter for the Lease prior to the Respondent's decision to reject all bids. On or about January 12, 1998, the Respondent advertised Request for Proposals ("RFP") for Lease No. 800:0176-COCOA. This was the second RFP issued by the Respondent for the Cocoa Lease. The Respondent did not receive any bids in response to the first RFP. Draft versions of both RFPs were prepared by Respondent's staff. There were only very "minor changes" in the contents of the first and second RFPs, such as revisions to the issuing and advertising dates. The Respondent received proposals from three entities: Robert and Sara Cook, 11 Riverside Corp., and James E. and Jacie Stivers. All three proposals were timely submitted. Respondent's General Services Manager, Fran Lyles, reviewed the three proposals and completed a responsiveness checklist for each proposal. When Ms. Lyles provided the three responsiveness checklists to Ms. Sandy Veal, the checklists for the proposals submitted by the Cooks and 11 Riverside Corp. did not contain any notations that said proposals were non- responsive. Ms. Lyles also informed Ms. Veal that the proposals submitted by the Cooks and 11 Riverside Corp. were responsive. On or about February 19, 1998, Sandy Veal traveled to Cocoa to perform site visits for the two responsive properties. On February 23, 1998, the Respondent issued a written letter of intent to award the Cocoa Lease to 11 Riverside Corp. The letter was prepared by Ms. Veal and signed by Ms. Lyles. The Petitioners timely filed a written Notice of Protest with the Respondent on March 2, 1998, in which the Petitioners challenged the Respondent's February 23, 1988, decision to award the Cocoa Lease to 11 Riverside Corp. In subsequent correspondent and telephone calls to the Respondent, Petitioners' agent provided a detailed analysis regarding the basis for the Petitioners' Notice of Protest. The primary basis was that the other two proposals were not responsive, and that, as the remaining responsive bidder, the Respondent should award the Lease to the Petitioners. Prior to the deadline for the filing of the Petitioners' Formal Written Bid Protest of the Respondent's February 23, 1988, decision to award the Cocoa Lease to 11 Riverside Corp., the Respondent informed the Petitioners that the Respondent had decided to reject all three proposals that the Respondent had received for the Cocoa Lease. On March 12, 1998, the Respondent provided written notification to the Petitioners that the Respondent had rejected all proposals and would "re issue [sic] at a later date." This date coincided with the deadline for the Petitioners to file their Formal Petition in support of their Notice of Protest pursuant to Florida law. On March 17, 1998, the Petitioners timely filed a second written Notice of Protest with the Respondent, in which the Petitioners challenged the Respondent's March 12 decision. No entity other than the Petitioners timely filed a Notice of Intent to Protest. The Respondent's contention that General Services Manager, Fran Lyles, did not review the RFP prior to its issuance is not credible. Ms. Lyles' testimony that she informed Ms. Veal that all three proposals were not responsive prior to Ms. Veal's trip to Cocoa for a site visit is also not credible. Ms. Lyles signed the award letter to 11 Riverside Corp., even though she had allegedly informed Ms. Veal that all three proposals were non-responsive. Ms. Lyles' explanation that she was very busy and simply didn't ask how an award could be made to a bidder that she had determined was non-responsive is also not credible. Ms. Lyles altered the responsiveness determination checklists after the Petitioners filed their Notice of Protest of the Respondent's award to 11 Riverside Corp. Words were added and white-out was used to cover up Ms. Lyles' initial responsiveness determination which was made prior to the filing of the Petitioner's first Notice of Intent. It appears that such alterations were made by Ms. Lyles in an attempt to shift the responsibility for errors made in the bidding process. The sole basis for the Respondent's contention that the proposals submitted by the Petitioners is non-responsive is that the site plan allegedly failed to show parking spaces. The evidence established that the site plan adequately showed the parking spaces, and that the proposal submitted by the Petitioners was responsive. The Respondent erroneously determined that the proposal submitted by the Petitioners was non-responsive. The proposal submitted by 11 Riverside Corp. failed to include the public entity crime statement as required by the Respondent's RFP, and also failed to include proof of zoning. The floor plan included in the proposals submitted by 11 Riverside Corp. failed to include the calculations as required by the Respondent's RFP. The proposal submitted by 11 Riverside Corp. also failed to include the documentation necessary to establish bidder control of the property as required by the Respondent's RFP. Any one of the aforementioned flaws in the proposal submitted by 11 Riverside Corp. rendered the proposal non- responsive. The building included in the proposal submitted by James E. and Jacie Stivers failed to provide the square footage calculations and failed to provide a scaled floor plan with square footage calculations, as required by the Respondent's RFP. The proposal submitted by the Stivers consisted of two separate facilities. However, the proposal submitted by the Stivers only included the items required by the Respondent's RFP for one of the two separate facilities. The proposal submitted by the Stivers failed to include a letter of authority from the owners of both facilities as required by the Respondent's RFP. Any one of the aforementioned flaws in the proposal submitted by the Stivers rendered the proposal non-responsive. It is not arbitrary for Respondent to reject all bids if there is only one responsive bidder. The state has discretion to award, or not award, in the event of a single responsive bidder, so long as the basis for the rejection is not improper. Whether such rejection is in the best interests of the state may be based on several criteria to be taken into account by the Respondent. One of the criteria is the absence of competition for state business and the lack of offerings. Rejection of all bids can be premised on an omission from the RFP or change in the Respondent's needs that would affect the ability of the Respondent to perform the duties prescribed by the Respondent. The Respondent provided evidence of the importance of correct specifications in the RFP. The Respondent made a decision before January 1, 1998, to develop new specifications for use in lease RFPs. The new specifications were used in the "Bradenton" RFP (issued after the Cocoa lease). The new specifications in the Bradenton RFP include a three percent cap on increases in the lease rate. This specification was material because it is an important part of the Respondent's budget evaluation. It was the Respondent's intent to use this new specification in the Cocoa RFP. Another specification omitted from the Cocoa RFP, that was in the Bradenton RFP, was the specification requiring proposer to provide copies of licenses of contractors. The Respondent intended to use that specification in the Cocoa RFP. The absence of this specification in the part has caused delays in occupancy of the leased space by the Respondent. Another specification omitted from the Cocoa RFP, that was in the Bradenton RFP, was the specification requiring the proposer to provide a construction schedule. The Respondent intended to use that specification in the Cocoa RFP. The absence of this specification was deemed by the Respondent to impede the Respondent's ability to assess liquidated damages. The Respondent identified a lease in Sarasota that was negatively affected by the absence of this specification. Another specification omitted from the Cocoa RFP, that was in the Bradenton RFP, was the specification requiring proposer to pay all renovation costs and that there be no outstanding liens on the property. The Respondent intended to use that specification in the Cocoa RFP. The absence of this specification has resulted in liens imposed on office space the Respondent was procuring. Another specification omitted from the Cocoa RFP, that was in the Bradenton RFP, was the specification clarifying whether the proposed space had to be in a single building. The absence of this specification was a concern to the Respondent and has created problems for other state agencies. The Department did not reject all proposals with the intent of avoiding a protest. The terms of the RFP do not specify when or how the Respondent is to notify proposers of the basis for the rejection of all bids. The evidence is insufficient to show that the Respondent's rejecting all proposals was illegal, arbitrary, dishonest or fraudulent.

Recommendation Upon the foregoing findings of fact and conclusions of law, it is RECOMMENDED that the formal bid protest filed by Petitioners be DISMISSED. DONE AND ENTERED this 24th day of June, 1998, at Tallahassee, Leon County, Florida. DANIEL M. KILBRIDE Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 Filed with the Clerk of the Division of Administrative Hearings this 24th day of June, 1998. COPIES FURNISHED: David A. Theriaque, Esquire 909 East Park Avenue Tallahassee, Florida 32301 Scott C. Wright, Esquire Department of Juvenile Justice 2737 Centerview Drive Tallahassee, Florida 32399-3100 Theodore E. Mack, Esquire Powell & Mack 803 North Calhoun Street Tallahassee, Florida 32303 Calvin Ross, Secretary Department of Juvenile Justice 2737 Centerview Drive Tallahassee, Florida 32399-3100 Janet Ferris, General Counsel Department of Juvenile Justice 2737 Centerview Drive Tallahassee, Florida 32399-3100

Florida Laws (1) 120.57
# 2
KELLOGG AND KIMSEY, INC. vs LEE COUNTY SCHOOL BOARD, 91-007597BID (1991)
Division of Administrative Hearings, Florida Filed:Fort Myers, Florida Nov. 26, 1991 Number: 91-007597BID Latest Update: Mar. 02, 1992

Findings Of Fact Upon consideration of the oral and documentary evidence addressed at the hearing, the following relevant findings of fact are made: The request for sealed bids for the construction of the Project was advertised on October 9, 16 and 23, 1991. There were six addenda to the original bid documents which added, deleted or modified provisions of the original bidding requirements, contract requirements, administrative requirements and technical specifications. The original bid documents plus the six addenda will be referred to herein as the "bid documents". The bid documents required that all bids be in full accord with the contract documents. Sealed bids for the Project were opened on October 30, 1991. Wright submitted the lowest lump sum bid for the Project, with Sovran submitting the second lowest lump sum bid and Kellogg submitting the third lowest lump sum bid. At the time of the bid opening, the bid documents listed only four casework manufacturers that were approved to furnish casework for the Project. Empire Custom Cabinets, Inc. (Empire) was not listed as one of the four approved casework manufacturers in the bid documents. The bid documents did not require the bidder to list the casework manufacturer it intended to obtain the casework from, but only that the bidder name the casework subcontractor. The only work item in the bid documents which requires identifying the name of the manufacturer on the subcontractor's list is the metal roof system. Because Empire's bid on the casework was extremely low compared to other bids received by Wright on the casework, Wright called Empire prior to submitting its bid to confirm that Empire's bid was submitted per plans and specifications. Although Wright did not specifically inquire of Empire at this time as to which manufacturer Empire was obtaining the casework from for the Project, Empire did advise Wright that Empire's bid on the casework was according to plans and specifications. Additionally, Empire did not divulge or advise Wright at this time that the bid was based on Empire manufacturing the casework for the Project. Based on this representation from Empire, Wright listed Empire as its casework subcontractor, and calculated its lump sum bid for the Project using Empire's bid. Although Wright listed Empire as its casework subcontractor in its bid, this did not create an irregularity in Wright's bid since Wright's bid was per plans and specification without exception or exclusion. This would require Wright to furnish casework for the Project manufactured by one of the four approved casework manufacturers listed in the bid documents regardless of which subcontractor Wright listed as the subcontractor for casework. By letter dated November 1, 1991, the Board's architect for the Project requested Wright to have Empire submit written certification by one of the four approved casework manufacturers that its casework was being furnished to Empire for the project. By letter dated November 4, 1991, Empire advised Wright that Empire's bid on the casework for the Project was based on casework to be manufactured by Empire. On the same day, Wright furnished the architect for the Project a copy of Empire's letter of November 4, 1991. In response to a request by the Board, Wright, by letter dated November 7, 1991, advised the Board that Wright would furnish casework manufactured by one of the four approved manufacturers listed in the bid documents for the Project. By letter dated December 3, 1991, Empire advised Wright that Empire would need to withdraw its bid if Empire was required to use casework manufactured by one of the four approved casework manufacturers listed in the bid documents. On that same day, Wright furnished the Board a copy of Empire's letter and requested that the Board allow Wright to remove and replace Empire with Steven Ward and Associates, Inc. (Ward), as the casework subcontractor since Ward would be able to furnish and install casework manufactured by LSI Corporation of America, Inc., one of the four approved casework manufacturers. No Action has been taken on that request. The bid documents provide for a subcontractor to be removed and replaced from the list of subcontractors after the bid is opened if there is a showing of good cause and written approval by the Board and the Project architect is obtained. Although Empire's bid on the casework for the Project submitted to Wright was based on Empire manufacturing the casework, there is competent substantial evidence in the record to establish facts to show that at the time Wright submitted its bid on the Project it had reasonable grounds to believe that Empire's bid on the casework was based on Empire furnishing and installing casework manufactured by one of the four approved casework manufacturers. After determining that Empire could not perform under its bid, Wright obtained a bid from Ward for furnishing and installing the casework for the Project which was less than Ward's original bid submitted to Wright before the bid opening. However, this bid was substantially more than Empire's bid, and if Wright is allowed to substitute Ward for Empire, Wright will have to absorb the additional costs since the bids were lump sum bids. Wright is neither attempting to furnish casework from a manufacturer that is not approved, nor is Wright requesting an increase in the lump sum bid price. The advertisement for Sealed Bids for the Project required that all bidders be prequalified by the Board prior to the bid date. Sovran and one other bidder were not prequalified by the Board prior to the bid date in accordance with Advertisement for Sealed Bids for the Project. Sovran received the bid documents for the Project approximately one month before the bid date but did not file a Notice of Protest of the prequalification requirement contained in the Advertisement for Sealed Bids for the Project. Sovran holds a certificate as a general contractor licensed in the State of Florida in accordance with Chapter 489, Florida Statutes. As a certified general contractor Sovran, pursuant to Section 489.125, Florida Statutes, was authorized to bid on the Project notwithstanding the Board's prequalification requirement. This was explained by the Board's representative at the bid opening. The bid documents required that a subcontractor list be submitted by all bidders, and when submitted with the bid becomes an integral part of the bid. The purpose of the subcontractor list was to prevent bid shopping, and to allow the Board an opportunity to review the subcontractors to determine if any subcontractor on the list had performed unsatisfactorily on previous Board projects. Neither the statutes relating to competitive bidding nor the bid documents prohibit the listing of the general contractor together with a subcontractor on a subcontractor list. The subcontractor list submitted by Sovran indicated "Sovran Constr/Naples" as the name of the subcontractor for the masonry work and "Sovran/Naples" as the name of the subcontractor for the poured-in-place concrete work. "Naples" is Naples Concrete and Masonry Work, Inc. The bid received by Sovran from Naples was for both labor and materials for the poured-in-place concrete and masonry work. Sovran neither requested nor did Naples furnish Sovran a bid to provide labor only for the poured-in-place concrete and masonry work. There was no agreement between Sovran and Naples whereby Sovran would supply the materials and Naples would furnish the labor for the poured-in-place concrete and masonry work. Sovran did request and receive bids from other companies for furnishing materials only for the poured-in-place concrete and masonry work. Sovran listed itself, the general contractor, along with Naples on the subcontractor list for the purpose of supplying the materials for the poured-in- place concrete and masonry work. Sovran's main reason for supplying the materials was that Naples was not bondable. Without a payment bond from Naples, Sovran would be without protection and could be forced into paying double for the materials in the event Naples failed to pay the material suppliers. Although the Superintendent of the Lee County Schools has recommended to the Board that the Board accept Wright's bid for the Project, the Board has not voted on that recommendation. The fact that Wright used Empire's bid to calculate its lump sum bid in no way excuses Wright for the requirement set out in the bid documents that casework used for the Project (when the time comes) be manufactured by one of the four approved casework manufacturers. Wright gains no economic advantage in this regard since the lump sum bid price remains the same. The advertisement for Sealed Bids on the Project provides that the Board reserves the right to waive any and all irregularities of any bid received.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is, accordingly RECOMMENDED: That the Board enter a Final Order dismissing the instant bid protest and awarding to Wright the contract for the construction of Elementary School "C", Job No. 91063. DONE and ORDERED this 13th day of February, 1992, in Tallahassee, Florida. WILLIAM R. CAVE Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 13 day of February, 1992. APPENDIX TO RECOMMENDED ORDER IN CASE NUMBER 91-7597B1D The following constitutes my specific rulings pursuant to Section 120.59(2), Florida Statutes, on all of the proposed findings of fact submitted by the parties in this case. Rulings on Proposed Findings of Fact Submitted by the Petitioner Each of the following proposed findings of fact are adopted in substance as modified in the Recommended Order. The number in parenthesis is the Finding(s) of Fact which so adopts the proposed finding(s) of fact: 1 - 3(1,2 and 3 , respectively); 4 - 5(6); 6(4); 7 - 9(5); 12(10); 13(11); 15 - 16(12); 17(13); 18 - 19(16); 20(29); 21(18); 23(19); 24 - 25(20); 26(22); 27(23); 28(22); 29 - 30(29); 32 - 33(25); and 34(26). Proposed finding of fact 10 is rejected as not being supported by competent substantial evidence in the record in that Wright's bid was as per plans and specifications without exceptions or exclusions which included the use of casework manufactured by one of the approved casework manufacturers. Proposed finding of fact 11 is rejected as not being supported by competent, substantial evidence in the record in that the Board knew of Empire's bid being based on nonconforming materials prior to issuing its Notice of Intent. However, the only information the Board had in reference to Wright's bid before issuing its Notice of Intent was that Wright had bid as per plans and specifications and would be installing casework manufactured by one of the approved manufacturers. The only question was whether Empire could furnish casework manufactured by one of the approved manufacturers. Proposed finding of fact 14 is neither material nor relevant. How the Board's architect interpreted Wright's bid is neither material nor relevant to this proceeding. Proposed finding of fact 22 is unnecessary to the conclusion reached in the Recommended Order. Proposed finding of fact 31 is more in the way of an argument than a finding of fact. Proposed findings of fact 35 and 36 are covered in the Preliminary Statement. The timeliness of Kellogg's protest is not an issue and therefore, a finding that it was timely is unnecessary. Rulings on Proposed Findings of Fact Submitted by the Respondent While not specifically adopting proposed finding of fact 1, where material or relevant or necessary to this proceeding, and supported by competent, substantial evidence in the record the stipulated facts have been adopted. Each of the following proposed findings of fact are adopted in substance as modified in the Recommended Order. The number in parenthesis is the Finding(s) of Fact which so adopts the proposed finding(s) of fact: 2(4,5); 3(9); 4 - 5(7); 7 - 8(8); 10(16); 11(14); 12(31); 13(21); and 15(23). Proposed finding of fact 6 is more in the way of an argument than a finding of fact. Proposed finding of fact 9 and 14 are neither material nor relevant. Rulings on Proposed Findings of Fact Submitted by the Intervenor See ruling on Respondent's proposed finding of fact Each of the following proposed findings of fact are adopted in substance as modified in the Recommended Order. The number in parenthesis is the Finding(s) of Fact which so adopts the proposed finding(s) of fact: 2 - 3(21); 4(24); 5 - 6(21); 13(23); 14(24,28); 15(22); 16 - 17(23,24); and 18(28). Proposed findings of fact 7 through 12 are neither material nor relevant to this proceeding. COPIES FURNISHED: David E. Gurley, Esquire Norton, Gurley & Darnell, P.A. 1819 Main Street, Suite 610 Sarasota, FL 34236 Marianne Kantor, Esquire The School Board of Lee County 2055 Central Avenue Fort Myers, FL 33901 James M. Talley, Esquire Fisher, Rushmer, Werrenrath, Keiner, Wack & Dickson, P.A. Post Office Box 712 Orlando, FL 32802 Karl Engel Superintendent Lee County School Board 2055 Central Avenue Ft. Myers, FL 33901 Honorable Betty Castor Commissioner of Education The Capitol Tallahassee, FL 32399-0400

Florida Laws (3) 120.53120.57489.125
# 3
A. B. DICK PRODUCTS COMPANY OF TALLAHASSEE, INC., vs. BOARD OF MEDICAL EXAMINERS, 88-003418BID (1988)
Division of Administrative Hearings, Florida Number: 88-003418BID Latest Update: Aug. 17, 1988

The Issue Whether the Petitioner was the lowest responsive bidder in Bid No. 88-030, and therefore entitled to the contract award.

Findings Of Fact The invitation to bid in Bid No. 88-030 contains specifications for two separate pieces of equipment which are to be used in the Respondent's print shop. These two items are: a) an offset duplicator with a "swing away," second color printing unit, and b) a camera/platemaker capable of processing silver masters. The Petitioner timely submitted bids on both items. On June 14, 1988, when the bids were opened, the Petitioner was the low bidder upon the equipment. The Petitioner's bids were disqualified by the Respondent, because the equipment offered did not meet the minimum specifications set forth in the bidding documents. A comparison of the minimum specifications for the duplicator and the manufacturer's specifications for the A.B. Dick #9850 duplicator that was bid by the Petitioner reveals the following differences: The specifications require the bidder to provide the Respondent with a duplicator that contains a 1 horsepower, D.C., drive motor. The A. B. Dick #9850 duplicator contains a 3/4 horsepower, A.C., drive motor. A 1/2 horsepower pump motor is required by the specifications. The literature attached to the Petitioner's bid does not reveal whether the A.B. Dick #9850 duplicator contains a pump motor. During the administrative hearing, Charles K. Hill testified that the A. B. Dick #9850 duplicator does have a pump motor. However, the size of the pump motor was not given. The specifications require a conveyor board with a jogging registration system. The A.B. Dick #9850 duplicator does not contain that type of paper feed system. Instead, the Petitioner's duplicator has a direct feed with a registration board. The paper travels only one-half of an inch in the duplicator so a conveyor board and joggers are not needed. Grippers accurately control the paper during the short travel distance. The Respondent specifically chose to require a conveyor board with a jogging registration system on a duplicator because the Respondent wants to have all of the controlling mechanisms it is possible to obtain on a duplicator within a certain price range. The conveyor board with a jogging registration system is a feature that is provided on duplicators in addition to a gripper margin adjustment and feeder bar system. The failure to provide this additional system is an omission as opposed to an alternate provision of a comparable system. The Petitioner submitted a bid upon a duplicator that did not conform in all material respects to the minimum bid specifications. The Petitioner' substituted a less expensive product with fewer features that ran on a different electrical current than the product sought in the invitation to bid. The comparison of the minimum specifications for the camera/platemaker and the A.B. Dick #148 camera manufacturer's specifications reveals the following differences: The specifications state that a reduction range of 60 percent and a magnification range of 125 percent are required. The A. B. Dick #148 camera has a reduction range of 64 percent and a magnification range of 105 percent. The specifications require a copy size of 20 1/2" x 33". The A. B. Dick #148 camera has a copy size of 23 1/2" x 26". The Petitioner submitted a bid upon a camera that did not conform in all material respects to the minimum bid specifications. The Respondent seeks a camera with a greater, and consequently more expensive, resizing range than the one bid upon by the Petitioner. The invitation to bid was liberal enough in its minimum bid specifications to allow competitive responsive bidding on comparable products from various vendors for the equipment and features sought by the Respondent. The bid posted by the Respondent from Standard Graphics, Inc., the apparent responsive low bidder, conforms in all material respects to the invitation to bid.

Florida Laws (4) 120.53120.57287.001287.012
# 4
GREENHUT CONSTRUCTION COMPANY, INC. vs DEPARTMENT OF GENERAL SERVICES, 92-001297BID (1992)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Feb. 24, 1992 Number: 92-001297BID Latest Update: Jun. 04, 1992

The Issue The issue for consideration herein is whether the Respondent's proposed award on BID No. HSMV - 90022010 to Dunn Construction Company, Inc., should be upheld.

Findings Of Fact At all times pertinent to the issues herein, the Department was the state agency responsible for the solicitation of bids for and award of contracts for the construction of state buildings in Florida. Both Greenhut and Dunn are qualified contractors who are certified to bid on state construction contracts in general and this procurement in particular. In December, 1991, the Department issued an advertisement for bids for the project in issue herein, the construction of the Kirkman Complex Addition Data Center in Tallahassee, Florida. According to the Advertisement for Bids, all bids "must be submitted in full accordance with the requirements of the Drawings, Specifications, Bidding Conditions and Contractual Conditions, which may be examined and obtained ..." from the Department's designated architect/engineer, Clemons, Rutherford and Associates, Inc. in Tallahassee. Section B-21 of the request for proposals (invitation to bid) reads, in pertinent part: The recommendation for contract award will be for the bidder qualified in accordance with Section B-2 and submitting the lowest bid provided his bid is responsible and it is in the best interest of the Owner to accept it. The Owner reserves the right to waive any informality in bids received when such waiver is in the interest of the owner. Bids received on this project were originally scheduled to be opened and read aloud on January 15, 1992 with the tabulation and Bid Award Recommendation to be posted the following days at the location where the bids were opened. The proposal as originally issued called for the submittal of a Base Bid with four Alternates, 1a, 1b, 2, and 3. Alternate 1a was a deduct for merely extending the existing Johnson Controls System to incorporate the new work instead of providing a totally new and independent control system. Alternate 1b called for adding furniture and landscaping for certain of the rooms shown on the drawings; Alternate 2 called for adding a "shelled" fourth floor as described in the proposal; and Alternate 3, as originally issued, called for: Add a complete fourth floor as indicated in drawings including the finished interior partitions with full HVAC, Plumbing and Electrical Service. Include furniture and landscaping for rooms 414 and 419. (Includes items in Alternate No. 2) As a result of questions received from prospective bidders at the pre-bid conference which indicated some confusion as to the meaning and intent of the Department regarding Alternate No. 3, by letter to all prospective bidders, dated January 8, 1992 the Department's architect indicated: Alternate #3 shall be the fourth floor complete, as shown on drawings, which includes items in Alternate #2. Addendum #1 to the request for bids, dated January 10, 1992, clarified Item 1-3.6), PROPOSAL FORM, of the PROJECT MANUAL to ADD to "Alternate #3", "(Include items in Alternate #2)". Item #2-1 of Addendum #2, dated January 16, 1992, deleted the sentence changed by Item #1- 3.6, and revised the sentence to read as follows: This includes any items required in addition to Alternate #2 to complete the remainder of the work for the Fourth Floor. Information contained at the beginning of each Addendum calls the bidders' attention to the change and indicates that failure to incorporate it may result in disqualification. The due date for bids was extended at the instance of the Department. Both Petitioner and Intervenor submitted bids for this project as did several other concerns on January 23, 1992. Greenhut's base bid was $4,139,000 with a deduct of $63,600 for Alternate 1a, and additions for Alternates 1b, 2, and 3 of $69,500, $239,000, and $209,000 respectively. Greenhut's total bid, therefore, through Alternate 3, was $4,592,900. Dunn's base bid was $4,079,000 with a zero deduct for Alternate 1a, and additions for Alternates 1b through 3 of $67,000, and $428,000. Dunn's total bid, therefore, was $4,574,000 for a difference of $18,900. Greenhut's bid was submitted on a form which provided for the base bid, the deduct for 1a, and the additions for 1b. 2 and 3 with the figure for 3 being those costs in addition to those identified in Dunn's bid was submitted on a prior form which provided for a base bid, a 1a deduction if any, (there was none), and additions for 1b, 2, and 3 with the figure for 3 including the figure listed for 2. An initial review of Dunn's bid form, then, showed a base bid of $4,079,000, no 1a deduction, a 1b addition of $67,000, a 2 addition of $311,000, and a 3 addition of $428,000. This letter figure included the $311,000 figure for Alternate 2, which should have been deducted from the bid during tabulation. When the bids were opened on January 23, 1992 by Mr. Everline, each figure on each bid was read off and listed on the bid tabulation form in the appropriate area. No attention was given at that time to the appropriateness or correctness of the figures listed on each bid form, nor was any attention paid to any other technical requirement of the procurement. This was merely a transfer of figures from the bid form to the tabulation form, and when this was done, Mr. Everline announced to all in attendance, including many contractor representatives, that the "apparent low bidder" was Greenhut. In arriving at that conclusion, Mr. Everline added all of Dunn's figures together without deducting the $311,000 listed for Alternate 2, a figure which was included in the $428,000 figure listed for Alternate 3. This resulted in an incorrectly large total bid for Dunn. Sometime later that day, a representative of Dunn contacted Mr. Everline to indicate that Dunn had inadvertently bid on the wrong form which precipitated its misleading presentation. Mr. Everline properly declined to discuss the matter and referred the Dunn representative to the Department's legal counsel. Sometime thereafter, when the bids had been tabulated and reviewed for responsiveness and legal qualification of bidders, Mr. Everline suggested to representatives of DHSMV that in order to forestall a protest, only so much of the project as extended through Alternate 2 be awarded. DHSMV officials, however, had sufficient funds available for the entire project, including some additional funds, if necessary, for cabling, and insisted they wanted the entire project awarded. The Department's legal counsel, upon review of the situation, concluded that the Dunn's actual bid intent was clear to include the amount listed for Alternate 2 within that listed for Alternate 3, and not to consider the two as additives to each other. It further concluded that Dunn's use of the improper form on which to submit its bid was immaterial and afforded it no improper competitive edge over other bidders. Therefore, it was concluded that Dunn was the low responsive bidder and, on February 4, 1992, the Department issued a Notice of Award to Dunn. Thereafter, Greenhut filed its Petition For Hearing taken as a protest to the award. Both the Department and Dunn agreed that Greenhut had standing to protest the award and that the protest was timely filed. It is so found.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is, therefore: RECOMMENDED that the Department of General Services enter a Final Order in this case dismissing the protest of Greenhut Construction Company, Inc., in regard to the proposed award of contact in bid number HSMV - 90022010 to Dunn Construction Company, Inc. RECOMMENDED in Tallahassee, Florida this 21st day of April, 1992. ARNOLD H. POLLOCK Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 21st day of April, 1992. APPENDIX TO RECOMMENDED ORDER IN CASE NO. 92-1297 BID The following constitutes my specific rulings pursuant to Section 120.59(2), Florida Statutes, on all of the Proposed Findings of fact submitted by the parties to this case. FOR THE PETITIONER: 1. - 6. Accepted and incorporated herein. 7. - 9. Accepted. Accepted. & 12. Accepted and incorporated herein. Accepted. Accepted. & 16. Accepted and incorporated herein. Accepted and incorporated herein. & 19. Accepted and incorporated herein. Accepted. & 22. Accepted and incorporated herein. Argument and not Finding of Fact except for 1st sentence which is accepted. & 25. Accepted and incorporated herein. FOR THE RESPONDENT: 1. - 3. Accepted. 4. - 6. Accepted and incorporated herein. 7. & 8. Accepted. 9. - 12. Accepted and incorporated herein. Accepted. Accepted and incorporated herein. Accepted and incorporated herein. & 17. Accepted and incorporated herein. Irrelevant but accepted as true. Accepted. Accepted and incorporated herein. Accepted. Accepted. Irrelevant but accepted as true. Accepted. Accepted and incorporated herein. Irrelevant. Accepted and incorporated herein. Accepted. FOR THE INTERVENOR: Accepted. - 5. Accepted and incorporated herein. Accepted and incorporated herein. & 8. Accepted and incorporated herein. Accepted and incorporated herein. Accepted and incorporated herein. Accepted and incorporated herein. - 15. Accepted. 16. - 19. Accepted. 20. & 21. Accepted. Accepted and incorporated herein. & 24. Accepted. COPIES FURNISHED: Robert A. Emmanuel, Esquire 30 South Spring Street Post Office Drawer 1271 Pensacola, Florida 32596 Sylvan Strickland, Esquire Suite 309, Knight Building 2737 Centerview Drive Tallahassee, Florida 32399-0950 Harry R. Detwiler, Jr., Esquire 315 S. Calhoun Street, Suite 600 Tallahassee, Florida 32301 Ronald W. Thomas Executive Director Department of General Services Suite 307, Knight Building 2737 Centerview Drive Tallahassee, Florida 32399-0950 Susan Kirkland General Counsel Department of General Services Suite 309, knight Building 2737 Centerview Drive Tallahassee, Florida 32399-0950

Florida Laws (1) 120.57
# 5
ALL AMERICAN COMPANIES vs DEPARTMENT OF ENVIRONMENTAL PROTECTION, 02-002776BID (2002)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Jul. 12, 2002 Number: 02-002776BID Latest Update: Oct. 25, 2002

The Issue At issue in this proceeding is whether the Department of Environmental Protection's decision to reject all bids submitted for the project entitled BDRS 52-01/02 was illegal, arbitrary, dishonest, or fraudulent.

Findings Of Fact Parties Petitioner, All America Homes of Gainesville, Inc. (All America), is a corporation doing business in the State of Florida. All America submitted a timely written bid in response to the Department's ITB and filed timely protests to the Department's actions. The Respondent, the Department of Environmental Protection, is an agency of the State of Florida which manages and operates state parks under its jurisdiction, and solicits construction projects in state parks, pursuant to Chapter 258, Part I, Florida Statutes, through its Division of Recreation and Parks, Bureau of Design and Recreation Services. The ITB In November, 2001, the Department issued an ITB on a construction project entitled Hillsborough River State Park Concession Building, project number BDRS 52-01/02. The ITB included the Bid Specifications for the project. Bids were required to be submitted no later than 3:30 p.m. on Tuesday, December 18, 2001, at the Bureau's Tallahassee, Florida, office. The written Specifications define several terms, including, but not limited, to the following: ADDENDUM: A written explanation, interpretation, change, correction, addition, deletion, or modification, affecting the contract documents, including drawings and specifications issued by the OWNER [Department] and distributed to the prospective Bidders prior to the bid opening. ALTERNATE BID: Separate optional bid item for more or less project requirement used for tailoring project to available funding. Also may consist of alternate construction techniques. BASE BID: Formal bid exclusive of any alternate bids. BID FORM: The official form on which the OWNER requires formal bids to be prepared and submitted. ORAL STATEMENTS: Verbal instruction. NOTE: No oral statement of any person, whomever shall in any manner or degree modify or otherwise affect the provisions of the contract documents.[1] SEALED BID: The formal written offer of the Bidder for the proposed work when submitted on the prescribed bid form, properly signed and guaranteed. The Bid Specifications also contained the following relevant sections: Alternatives If the OWNER wishes to learn the relative or additional construction cost of an alternative method of construction, an alternative use of type of material or an increase or decrease in scope of the project, these items will be defined as alternates and will be specifically indicated and referenced to the drawings and specifications. Alternates will be listed in the bid form in such a manner that the Bidder shall be able to clearly indicate what sums he will add to (or deduct from) his Base Bid. The OWNER will judge for himself that such alternates are of comparable character and quality to the specified items. The Order of the alternate may be selected by the Department in any sequence so long as such acceptance out of order does not alter the designation of the low bidder. ADDENDA If the Consultant[2] finds it would be expedient to supplement, modify or interpret any portion of the bidding documents during the bidding period, such procedure will be accomplished by the issuance of written Addenda to the bidding documents which will be delivered or mailed by the OWNER'S Contracts section to all bidders who have requested bidding documents. Interpretation No interpretation of the meaning of the drawings, specifications or other bidding documents and no correction of any apparent ambiguity, inconsistency or error therein will be made to any Bidder orally. Every request for such interpretation or correction should be in writing, addressed to the Consultant. All such interpretations and supplemental instructions will be in the form of written Addenda to the bidding documents. Only the interpretation or correction so given by the Consultant in writing and approved by the OWNER shall be binding, and prospective Bidders are advised that no other source is authorized to give information concerning, or to explain or interpret, the bidding documents. B-16 Bid Modification Bid modification will be accepted from Bidders, if addressed as indicated in Advertisement for Bids and if received prior to the opening of bids. No bid modification will be accepted after the close of bidding has been announced. Modifications will only be accepted if addressed in written or printed form submitted with the bid in sealed envelopes. Telegrams, facsimiles, separate sealed envelopes, written on printed modifications on the outside of the sealed envelopes will not be accepted. All bid modifications must be signed by an authorized representative of the Bidder. Modification will be read by the OWNER at the opening of formal bids. B-21 Rejection of Bids The OWNER reserves the right to reject any and all bids when such rejection is in the interest of the State of Florida, and to reject the bid of a bidder who the OWNER determines is not in a position to perform the work. B-23 Award of Bid . . .The qualified Bidder submitting the lowest bid will be that Bidder who has submitted the lowest base bid plus any selected alternates. . . . The OWNER reserves the right to waive any minor irregularities in bids received when such waiver is in the interest of the OWNER. The Award of Bid will be issued by the OWNER only with responsible Bidders, found to meet all requirements for Award of Bid, qualified by experience and in a financial position to do the work specified. Each bidder shall, if so requested by the OWNER, present additional evidence of his experience, qualifications and ability to carry out the terms of the Agreement. (Emphasis in original, except for Section B-10.) The Bid Form is included with the Specifications and provides in part: Base Bid: Furnish labor, equipment, Lump Sum $ supervision and material to construct a new concession building of 2940 square feet located at the Hillsborough River State Park along with the alteration of the existing concession building according to plans and specifications. Alternate #1: Furnish labor, equipment, Add Amt.$__ supervision and material to renovate the existing concession building according to plans and specifications. There is a separate section for "Allowances," i.e., Section 01210, for the Hillsborough State Park. This section provides in part: SECTION 01210 – ALLOWANCES * * * 1.2 SUMMARY This Section includes administrative and procedural requirements governing allowances. Certain materials and equipment are specified in the Contract Documents and are defined by this [sic] specifications as material and labor to be provided against a pre-determined allowance. Allowances have been established in lieu of additional requirements and to defer selection of actual materials and equipment to a later date when additional information is available for evaluation. If necessary, additional requirements will be issued by Change Order. * * * 3.3 SCHEDULE OF ALLOWANCES A. Allowance #1: Include in the base bid an allowance for the purchase and installation of. . . kitchen equipment. . . . The total dollar amount of the allowance to be included shall be $12,000.00. There is also a separate section for "Alternates," i.e., section 01230, for Hillsborough River State Park, which provides in part: SECTION 01230 – ALTERNATES * * * 1.3 DEFINITIONS Alternate: An amount proposed by bidders and stated on the Bid Form for certain work defined in the Bidding Requirements that may be added to or deducted from the Base Bid amount if OWNER decides to accept a corresponding change either in the amount of construction to be completed or in the products, materials, equipment, systems, or installation methods described in the Contract Documents. The cost or credit for each alternate is the net addition to or deduction from the Contract Sum to incorporate alternate into the Work. No other adjustments are made to the Contract Sum. . . . . 3.1 SCHEDULE OF ALTERNATES A. Alternate No. 1: Renovate the existing concession building in its entirety as shown in the drawings and specified herein. (emphasis added.) At this stage of the bidding documents, the contractor/bidder is requested to provide a Base Bid/Lump Sum on the Bid Form to "[f]urnish labor, equipment,. . .to construct a new concession building," and to provide an additional and separate amount for Alternate No. 1 to "[f]urnish labor, equipment, . . . to renovate the existing concession building." On December 13, 2001, the Bureau issued "Addendum No. One (1)" (written by the architect) to the ITB on the "Hillsborough River State Park – Concession Building." The Addendum contained the following relevant sections: Specification Section 01210: Allowances Add the following new paragraph 3.3.B: ”Allowance #2: Include in the base bid an allowance for the renovations of the existing concession building; renovations shall be defined by the Owner. The total dollar amount of the allowance to be included shall be $25,000." Specification Section 01230: Alternates Modify paragraph 3.1.A. as follows: "Alternate No. 1: Renovate the existing concession building as defined by the Owner, and as provided for under Section 01210, Allowances." (emphasis added.) Each contractor was required to sign the Addendum and attach it to the bid. By definition, and pertinent here, an addendum is an additional written instruction to a contractor during the bidding process. Based on the weight of the evidence, the purpose of this Addendum was to require the contractor to include a $25,000.00 Allowance (for Allowance # 2) in the Base Bid, for the work which might be performed if the Department requested the work to be performed for Alternate No. 1, i.e., for the renovation of the existing concession building.3 (The Department's architect decided it would cost approximately $25,000.00 to renovate the existing concession building, hence Allowance # 2.) In other words, the Addendum does not have a specific dollar amount to be included for Alternate No. 1. Rather, the $25,000.00 is an Allowance for the work described as Alternate No. 1, but the amount is to be included in the Base Bid and not as a separate line item, dollar amount. But, importantly, the Addendum did not delete the potential work to be performed as described in Alternate No. 1, although Mr. Bowman and others believed that the Addendum deleted Alternate No. 1. It deleted the necessity to place a specific dollar amount on the Bid Form for Alternate No. 1. (Mr. Bowman is a registered Professional Engineer and a licensed contractor. He has worked for the Department for 15 years and has served as Bureau Chief for two years. He supervises the contract section and the design section, which was responsible for preparing the technical plans and specifications and bidding out the job.) Mr. Bowman offered the following explanation why he believed the Addendum was confusing: Okay. I think the confusion that was created, you know, I think the addendum in itself, you know, said add $25,000 to the base bid, but then on the bid form, it still had the space down there for alternate number one, which alternate number one, which alternate number one had become $25,000 that was to be allowed for the concession building, and I think that's where the confusion came in because I think they were still confused, that they weren't really sure that they should not put that 25 down there but they knew they had been told in the addendum to do it and I think that's the reason for the notes and we got to the correspondence on the bid form, was they wanted to make sure that that's what we were wanting to do. And I think that's where the confusion came in. Like I said, it's always, if you could go back and do it again, it would be much wiser just to issue a whole new bid form and then we wouldn't be here today. But, we didn't do that. Okay. So, that's why we are here. The language in this Addendum, when read with the original Bid Specifications, apparently caused confusion with some of the bidders on the project. Several bidders called Marvin Allen (an architect and project manager for the Department's Bureau of Design and Recreation Services) prior to the submission of the bids, to clarify how the $25,000.00 Allowance should be shown on the Bid Form. (Mr. Allen did not author any of the specifications, including the Addendum.) He was listed as a contact person. He did not contact any bidders. But, Mr. Allen recalled telling each bidder who asked that the Allowance of $25,000.00 should be included in the Base Bid. But, he does not recall the names or numbers of the bidders who called, "possibly" three, four or five. Mr. Allen believed the Addendum was clear. According to Mr. Allen, the bidders who called him found the Addendum confusing. The oral responses to the bidders can be construed as interpretations of the Addendum. However, pursuant to Section B- 10 of the Specifications, any such interpretations were required to "be in the form of written Addenda to the bidding documents." Also, any such questions should have been in writing. If Section B-10 were complied with, all bidders would have been potentially on the same footing, or, at the very least, would have had access to a written clarifying document. Opening of the Bids On December 18, 2001, the bids were opened by Mike Renard, Contracts Manager with the Bureau of Design and Recreation Services, and Susan Maynard, Administrative Assistant. Mr. Dwight Fitzpatrick, a representative of All America, also attended the bid opening. The Bid Form submitted by Nelco showed a Base Bid of $355,478.00 (Lump Sum $355,478.00), and also showed an amount of $25,000.00 on the Alternate # 1 line (Add Amt. $25,000.00). See Finding of Fact 6. (It was clear to Mr. Renard that the $25,000.00 should have been included on Nelco's Base Bid. But Mr. Renard believed that Nelco submitted a responsive bid because the Department only accepted the Base Bid. Mr. Bowman agreed.) Nelco was the only one of five bidders to have a dollar amount in the Alternate #1 line under "Add Amt. $ ." All America submitted the second lowest Base Bid of $362,000.00. There was also a hand-written note on the All- America Bid Form that stated: "Addenda # 1 instruction to place $25,000 allowance in both Base Bid and as alternate # 1." Another hand written note was located below the "Add Amt. $-0-" line: "amount added in Base Bid with $25,000 allowance per Marvin Allen." The Department considered All America's bid responsive. It is a fair inference that three out of five of the other Bid Forms contained language indicating that the bidders were relying on Addendum No. One by placing the $25,000.00 Allowance in the Base Bid.4 It is uncertain whether they did so in light of the instructions of Mr. Allen concerning how to complete the Bids Forms. However, given the nature of the calls to Mr. Allen, there is a reasonable inference that there was some confusion among some of the bidders. The Department determined that Nelco submitted the lowest Base Bid, but the Department's staff had a question as to whether Nelco had included the $25,000.00 in its Base Bid. After conferring with his superiors, Mr. Renard was instructed to call Nelco to make certain that its Base Bid included the Allowance amount ($25,000.00). Mr. Renard spoke with Steve Cleveland, Nelco's Project Manager, "to verify the fact that [Nelco] had the allowance in their base bid." Mr. Cleveland orally confirmed that Nelco's Base Bid included the $25,000.00 Allowance. Mr. Renard asked Mr. Cleveland to send him a letter verifying this statement. Mr. Renard viewed this inquiry as a request for clarification or verification, not an opportunity for Nelco to modify its bid. Mr. Bowman agreed. (Mr. Renard did not believe Addendum No. 1 was confusing.) In a letter dated December 20, 2001, Mr. Cleveland confirmed that Nelco’s Base Bid of $355,478.00 included the Allowance amount and that Nelco could still perform the contract if the $25,000 Allowance was removed from its Base Bid pursuant to the ITB, i.e., that Nelco would perform the contract for $355,478.00 less $25,000.00, or $330,478.00, if the Department did not accept Alternate # 1 and the Allowance. (An alternate does not have to be accepted by the Department.) According to Mr. Renard, Mr. Cleveland never mentioned modifying, changing, or altering Nelco's bid. The Department only accepted the Base Bid for each bid. Mr. Renard did not consider it unusual to call a bidder or contractor to verify information to determine whether they can or cannot perform the work at the stipulated price. He considered it common to make this inquiry. Also, it was common in Mr. Bowman's experience to call a bidder to get clarification. Mr. Renard was not aware of any statute or rule which authorizes the Department to request clarification from a bidder after the bids are opened. Mr. Renard was more familiar with the bid forms than Mr. Allen. After receiving Mr. Cleveland's letter, the Department determined that Nelco submitted the lowest Base Bid and that the $25,000.00 amount that Nelco wrote on the Bid Form Alternate # 1 line, was a minor irregularity in the bid which the Department, as the Owner, could waive pursuant to the ITB. On December 20, 2001, the Department posted the Tabulation of Bids showing the anticipated award of the contract to Nelco. At the hearing, an unsigned letter on Department letterhead was introduced, which was addressed to Nelco and stated that Nelco submitted the apparent low bid. However, Mr. Renard testified that these letters are prepared routinely, but not mailed out without his signature. Mr. Renard did not recall signing the letter or ever sending out such a letter to Nelco. On December 21, 2001, the Department received a Notice of Intent to Protest letter from Allen E. Stine, the President of All America. In his letter, Mr. Stine stated that Nelco’s bid should have been rejected for failure to follow the specified format as per Addendum No. 1, or adjusted to have the $25,000.00 amount added to their Base Bid. Bid Protests All America filed a written formal bid protest on January 4, 2001. On January 9, 2001, Cindy Otero of All America, notified Mr. Renard by letter, and stated that Mr. Stine was available for a hearing regarding the bid protest. On January 28, 2002, Mr. Renard returned All America's check for the bond, stating that it was unnecessary. Mr. Stine recounted a number of unanswered telephone calls after the first protest was filed. During one conversation, Mr. Renard recalled Mr. Stine saying to him, "You can't do this, you can't do this." After receiving the first formal protest, the Department staff consulted with legal staff and reviewed the documents and bid procedures. Based on the number of questions received concerning the Addendum and the hand-written notes on several of the bid forms, Mr. Bowman, Bureau Chief, determined that the bid documents were confusing and ambiguous. (Mr. Bowman stated that this was their first bid protest in his 15 years with the Department.) Therefore, Mr. Bowman decided that it would in the best interest of the State of Florida to reject all of the bids pursuant to the Bid Specifications. Mr. Bowman felt that the ITB should be re-written in order to make it clearer and allowing all of the bidders to re-bid the project without any confusion or ambiguity. Mr. Stine stated that his "senior estimator" told him that the bid language "could be confusing." He and his "senior estimator" had a discussion about whether the Allowance should have been placed in the Base Bid or not. At the time of submission of All America's bid, Mr. Stine was clear that the Allowance should be placed in the Base Bid, especially after calling Mr. Allen. But, his senior estimator was not so clear. In order to appease him, Mr. Stine placed the hand-written note on All America’s proposal. Mr. Stine essentially, "cleaned" up his proposal. At the hearing, Mr. Bowman testified Rule 60D-5.0071, Florida Administrative Code, see Conclusion of Law 59, does not list "confusing or ambiguous bid specifications" as one of the circumstances allowing for the rejection of all bids. However, Mr. Bowman later stated during the hearing that he believed the circumstances listed in Rule 60D-5.0071 were not the only circumstances authorizing the Department to reject all bids. Mr. Bowman testified that he believed that general confusion among the bidders caused by the ambiguous ITB constituted sufficient grounds for rejecting all bids. Mr. Bowman was advised by legal counsel that rejecting all of the bids would probably result in another bid protest by Nelco, All America, or both. Thus, the Department decided to delay addressing All American’s first protest until after posting the rejection of all bids and receiving the subsequent protests, so that all of the protests could be resolved at once in an efficient and economical manner. Notwithstanding the Department's justifications for rejecting all bids and not proceeding on All America's initial protest, the record is unclear why the Department waited several months to reject all bids. On May 13, 2002, the Department posted the rejection of all bids. On May 16, 2002, the Department received a formal written protest of the rejection of all bids filed by All America. On May 17, 2002, Jerome I. Johnson, attorney for the Department, contacted Mr. Robert A. Lash, All America's counsel at the time, concerning the resolution of All America’s formal protest. (Before the final hearing, Mr. Lash, with All America's consent, withdrew as counsel for All America.) The parties agreed to suspend formal bid protest procedures until a meeting could be held between the parties in an attempt to resolve the protests. Mr. Johnson sent a letter dated May 21, 2002, to Mr. Lash confirming this conversation. On June 26, 2002, a meeting was held among the Department staff, legal staff, and Mr. Lash and Mr. Stine, representing All America. The parties were unable to resolve the protests. At the conclusion of the meeting, the parties agreed that formal protest procedures would not be implemented until Mr. Stine could confer further with his counsel. In a letter dated July 5, 2002, Mr. Lash stated that his client wished to proceed with formal protest procedures and requested an administrative hearing on the protests. Are the Specifications and Bid Documents Ambiguous and Was There Confusion? The parties stipulated that "[t]he Addendum language was confusing," notwithstanding the testimony of several witnesses that they were not confused. The Department's determination that the bid Specifications, including the Addendum, and the Bid Form, which remained unchanged after the Addendum was issued, were confusing and ambiguous, is supported by the weight of the evidence. This is particularly true regarding the Bid Form. The Addendum required the bidder to include an Allowance of $25,000.00 in the Base Bid for work described as Alternate # 1. But the Bid Form was unchanged to reflect the Addendum changes. The Bid Form retained a line for the bidder to submit an additional amount for Alternate # 1. Further, it appears that several bidders were confused, including, Mr. Stine, who spoke with Mr. Allen and requested and received clarification. Further, it is unclear whether all of the bidders, including Nelco, were aware of the oral interpretations or clarifications of the Addendum rendered to some of the bidders. Rejection of All Bids Based upon the foregoing, given the standard of review in this proceeding discussed in the Conclusions of Law, the weight of the evidence indicates that the Department's action, in rejecting all bids, was not illegal, arbitrary, dishonest, or fraudulent. The Department's staff was well-intended and made some mistakes along the way, e.g., by not changing the Bid Form, which they readily admit. But there was a rationale for rejecting all bids under the circumstances.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is recommended that the Department issue a final order dismissing All America’s Petition to Prevent Rejection of Bids and Award Contract to Petitioner and denying All America's request for attorney’s fees and costs. DONE AND ENTERED this 24th day of September 2002, in Tallahassee, Leon County, Florida. CHARLES A. STAMPELOS Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 24th day of September 2002.

Florida Laws (3) 120.569120.57120.595
# 6
LEE A. EVERHART AND COMPANY, INC. vs. DEPARTMENT OF CORRECTIONS, 83-001761 (1983)
Division of Administrative Hearings, Florida Number: 83-001761 Latest Update: May 02, 1990

Findings Of Fact On or about February 9, 1983, the State of Florida, Department of General Services, Division of Construction and Property Management, Bureau of Property Management ("DGS"), received a certification of need from the Department of Corrections ("DOC") requesting authority for DOC to advertise for competitive bids from private persons interested in providing leased office space needed to house DOC's Bureau of Industries. The Bureau of Industries was then located in leased space with leases which were scheduled to expire June 30, 1983. The Bureau of Industries has been located in DOC's central office area since its creation in 1957. The DOC central office includes the Secretary and Deputy Secretary; the Assistant Secretaries for Operations, Programs, Management, and Budget. All these officials, together with subsidiary bureaus, staff, and other subordinates are located in two adjacent buildings of the Winewood Office Complex on Blair Stone Road in Tallahassee. The prison industry program is under the supervision of the industries administrator who reports directly to the Assistant Secretary for Operations. DOC sought approval from DGS to enter into a lease for privately owned office space because of its perceived need to locate within walking distance of its central office. Programs administered by the Bureau of Industries work closely with other DOC personnel and functions located in the central office in the Winewood Office Complex. Moving any distance from the central office would create problems for the DOC mailing system and would require extra time spent traveling to and from the central office. Personnel in the Bureau of Industries utilize central office files, and confer often with staff located in the central office. Locating outside the general area of the central office would require additional expenses with regard to availability of vehicles, pick up of mail and supplies, and duplication of support services. Accordingly, DGS and DOC determined, and the record in this cause establishes, that it would not be in the state's best interest to require DOC to locate its Bureau of Industries program either in state-owned buildings in the Capitol Center, or in any area beyond walking distance of the central office location. On March 21 and 31, 1983, respectively, DOC published an advertisement in the Tallahassee Democrat inviting all interested persons to submit sealed bids at or before 2:00 p.m. on April 19, 1983, in accordance with the Invitation to Bid and Specifications prepared by DOC for the office space needed to house the Bureau of Industries. A portion of the bid specifications required that office space to be leased be located within a circle drawn on a city map of the City of Tallahassee, Florida, which could roughly be described as the southeastern portion of the city, in the vicinity of the Winewood Office Complex. There were four possible bidders in the area within the circle on the map attached to the bid specifications. Of these four possible bidders, two within the area actually submitted bids--Blairstone Center Partners and Washington Square, Ltd. One of the general provisions of the bid specifications provided as follows: The Department of Corrections reserves the right to reject any and all bids, waive any minor informality or technicality in bids received and to accept that bid deemed to be the lowest and best. . . At or before 11:00 a.m. on April 19, 1983, DOC received sealed bids from Petitioner and Intervenors in response to the aforesaid advertisement, and at 11:00 a.m. on April 19, 1983, DOC opened, tabulated, and published each of the bids. The bid submitted by Petitioner was not responsive to the requirements of the Invitation to Bid and Specifications because the property offered by Petitioner in its response was outside the area indicated on the map annexed to the Invitation to Bid. The bid submitted by Intervenor, Blairstone Center Partners, failed to offer the full services specified in paragraph six of DOC's Bid Submittal Form; failed to offer the exclusive parking specified in the paragraph seven of the Bid Submittal Form; failed to supply the photographs specified in paragraph ten of Respondent's Bid Submittal Form; and failed to supply the information specified in paragraphs one through eight of the Bid Submittal Form. Accordingly, the record in this cause fully establishes that the bids submitted by Petitioner and by Intervenors Blairstone Center Partners, failed to comply with the requirements of the Invitation to Bid and Bid Submittal Form, and that the deficiencies in the bids of Petitioner and Intervenor, Blairstone Center Partners, were so material as to require their rejection. The Invitation to Bid and Bid Submittal Form required that bidders offer for lease 2,683 square feet, plus or minus three percent. The bid submitted by Intervenor, Washington Square, Ltd., offered 2,797 square feet, which is approximately 34 square feet more than allowed in the Invitation to Bid. After this fact was discovered upon opening the bid, DOC personnel contacted a representative of Washington Square, Ltd., and advised the net square footage offered in the bid submitted by Washington Square, Ltd., exceeded the net square footage of space that DOC was authorized to lease and pay for under the Invitation to Bid. Washington Square, Ltd., subsequently agreed to modify its proposal by relieving DOC from any obligation to pay for the extra 34 square feet, and reducing the annual rental for the first year from $26,012.10 to $25,695.90, and for the second year from $27,576.60 to $27,243.18. The record in this cause does not establish any misconduct or collusion between Washington Square, Ltd., and DOC personnel obtaining this modification, nor does the record in this cause establish that any actual or prospective bidders suffered any competitive disadvantage as a result of this modification. The effect of Washington Square, Ltd.'s modification of its proposal rendered that proposal the only bid which was responsive to the Invitation to Bid. On August 18, 1983, Washington Square, Ltd., executed a deed to the property which was the subject matter of its bid to Ben Grace. Washington Square also executed an assignment of the proposed bid award to Grace.

Florida Laws (3) 120.57243.18255.25
# 7
FRED D. BOOZER vs. DEPARTMENT OF HEALTH AND REHABILITATIVE SERVICES, 89-002712BID (1989)
Division of Administrative Hearings, Florida Number: 89-002712BID Latest Update: Jul. 21, 1989

The Issue Whether Respondent was justified in cancelling the award of bid of HRS Lease No. 590:2054 to Petitioner, BOOZER, on the basis that it was nonresponsive. Whether Respondent acted fraudulently, arbitrarily, illegally or dishonestly in issuing an award of HRS Lease No. 590:2054 to Intervenor rather than to Petitioners or some other bidder.

Findings Of Fact Based upon all of the evidence, the following findings of fact are determined: HRS caused an invitation to bid to be advertised regarding Lease No. 590:2054 on January 3, 1989 and January 10, 1989. The Invitation to Bid required that all bids be received on or before 2:30 p.m. February 1, 1989, for 9,168 net rentable square feet, plus or minus 3%, of existing office space. A pre- bid meeting was scheduled for January 11, 1989. The advertisement also advise that the bid specifications could be obtained from the Orlando Regional Office of HRS, and that the State of Florida reserved the right to reject any and all bids. The material provisions of the bid specifications at issue in this proceeding are: The space be made available on September 1, 1989 or within 175 days after bid is finalized. The proposed space must be in an "existing building", which was: defined to mean "dry and capable of being physically measured to determine net rentable square footage at the time of bid submittal". The bidder provide 2 clear photographs of the exterior front of the proposed facility and 2 scaled (1/8 inch or 1/4 inch 1 foot preferred) floor plan showing present configurations with measurements that equate to the net rentable square footage (HRS Exh. 1, General Specifications Requirement No. 10(a)) Emphasis in original). Building(s) in not more than 2 locations provided the facilities are immediately adjacent to or within 100 yards of each other. Prior to the pre-bid conference, but after the initial publication of the bid invitation, representatives of NOTTUS contacted Ernie Wilson, the facilities services manager for District 7, HRS, to inquire regarding the propriety of submitting a bid for space in two buildings in which HRS presently had facilities, together with a facility that was greater than 100 yards from the existing facilities. At the time of the inquiry, NOTTUS was leasing facilities to HRS at its Lipscomb facility in Palm Bay, Florida. A portion of the square footage that NOTTUS inquired about leasing to HRS was the remaining square footage in two buildings that HRS partially occupied at that time. All of the premises submitted by NOTTUS under its bid package were located in the Woodlake PUD, which is all under single ownership. A representative from HRS advised the representative from NOTTUS that: the issue regarding the proximity of the locations would not be addressed as a bid specification, but rather, that would be a matter to be weighed by the evaluation committee in analyzing the bids. the bid proposal to be submitted would actually be for two locations as a portion of the space offered by NOTTUS was to be located in buildings in which HRS presently maintained facilities. The submittal of the bid package regarding the premises subject to occupancy by HRS, as ultimately submitted by NOTTUS, would definitely not disqualify the bid submittal. Mr. Wilson also received telephone calls from BOOZER and a third bidder making inquires regarding the bid package. The Pre-bid conference was held on January 11, 1989. No objections or questions regarding the bid specifications as to be utilization or definition of the terms "existing building" and "present configuration" were raised at that time. At no time prior to the submission of the bids were any objections or questions raised by BOOZER regarding the utilization of the term "existing building" or the term "present configuration" as those terms were defined within the bid specification. Each of the Petitioners in this action, the Intervenor, as well as two other parties, submitted bids to HRS within the time requirement set forth in the bid documents. The bids were opened at the time and place reflected in the aid documents and Invitation to Bid. Subsequent to the opening of the bids, John Stewart, who is Ernie Wilson's supervisor, and Ernie Wilson reviewed the bid packages submitted for Lease No. 590:2054 and made a determination as to which bids were responsive. As a result of that evaluation, a determination was made that all five bidders were responsive. These bidders were the Petitioner, Fred D. BOOZER, the Intervenor, Nottus, Inc. the Petitioner, Trust NB-1 Micah G. Savell and Professional Center V. Inc. These bid proposals were then submitted to the evaluation committee who viewed the property of each of the bidders on February 13, 1989. The bid documents of BOOZER contained an additional document, i.e., a site plan, which reflected that the premises subject to his bid proposal were an "existing building". The area submitted for the bid was shaded reflecting the entire square footage submitted for bid as being "in existence." The drawing further reflected the "existing building" as being the "proposed HRS building". The premises subject to the Petitioner's, BOOZER, bid were not in existence, as that term was defined in the bid specifications, in that approximately 2500 square feet had not yet been constructed. Two walls, a floor slab and a roof were not in existence. The only improvements located therein were palm trees, grass and a sidewalk. Petitioner stipulated that the area occupied by the palm trees, grass and sidewalk was in fact "not dry". The existing building at 2225 South Babcock Street that was dry at the time of the bid opening constituted approximately 6,900 square feet of premises subject to Petitioner's bid. At the time of the inspection, the Petitioner, BOOZER, was present. At no time did BOOZER indicate that the total facility bid was not in existence. The members of the evaluating committee who viewed the property for purposes of evaluating the bid were not aware of the fact that the entire premises subject to BOOZER's bid proposal was not in "Existence" and "dry". The floor plan showing the present configuration of BOOZER's facility reflected an open floor space for the area occupied by the palm trees, grass and sidewalk. The palm trees, grass and sidewalk were not reflected in the present configuration drawing. Both the floor plan and site plan were prepared by BOOZER's son with his approval. In evaluating the respective bid proposals, the evaluation committee rated the properties as follows: Fred D. BOOZER - 450 points Nottus, Inc.- 433 points Micah Savell - 384 points Trust NB-l - 360 points Professional Center V. Inc.- 357 points The location requirement found in Article D.3(b) of the bid package was taken into account. In evaluating the Nottus bid, including a zero rating from one of the evaluation committee members. As a result of the points awarded by the evaluation committee, a determination was made to award the bid to BOOZER, who was notified of this award on or about March 14, 1989 by letter dated March 14, 1989. On or about March 20, 1989, Petitioner, BOOZER, obtained a construction permit from the City of Melbourne to construct a fire wall and framing for additional shell building. This building permit was for the purpose of enclosing the area that was occupied by the palm trees, grass and sidewalk at the time of the bid proposal being submitted. Upon being awarded the bid, Petitioner, BOOZER then made a decision to commence construction to complete the premises subject to his bid proposal, and had expended $28,000 thereon through the hearing date. On or about March 29, 1989, HRS, through Ernie Wilson and Lynn Nobley, discovered the fact that approximately 2,500 square feet represented as being a part of the existing building, in fact was not existing pursuant to the bid specifications. At the time of this discovery, construction under the construction permit had not been completed. Mr. Wilson advised BOOZER at that time that he was concerned that BOOZER's bid was nonresponsive because the premises subject to the bid proposal were not in an "existing" building at the time of the bid submittal. The normal procedure for HRS in awarding a bid where the initial award is cancelled or thrown out is to award the bid to the second and next best lowest bidder. It is not the normal practice of the HRS evaluation committee to measure the applicable properties at time of evaluation to determine net rentable square footage. At the time of discovery of the foregoing status of BOOZER's building, Ernie Wilson, contacted a Nottus representative, Fred E Sutton, its President, to advise him of the possible nonresponsiveness of BOOZER's bid and requested information to determine whether Nottus, the second low bidder, still had facilities available pursuant to its bid documents and whether Nottus would agree to continue to continue to be bound by the terms thereof. Mr. Sutton advised Ernie Wilson that the facilities were still available and that Nottus would agree to abide by the terms of its bid proposal. Following the procedural steps necessary to advise the appropriate individuals within HRS of the possible nonresponsive bid by BOOZER, Ernie Wilson was advised by the Director of HRS General Services, King W. Davis, by letter dated April 2, 1989 to withdraw the award for the proposed lease 590:2054 from BOOZER because of approximately 2,500 feet of nonexisting space. He was also instructed to award same to Nottus as the second lowest bidder. On or about April 14, 1989, Ernie Wilson advised BOOZER of the Notice of Withdrawal of the award from BOOZER and award to Nottus, together with the reasons therefor, which was received by BOOZER on April 17, 1989. Petitioner, BOOZER, timely initiated these actions by filing his Notice of Intent to appeal the withdrawal of the award of bid to him and the award to Nottus, and by timely filing a formal written protest and request for formal hearing. Attachment "D" of the bid package required the submittal of a proposed plan to a division of the State Fire Marshal for review of any proposed construction or renovation to determine whether such construction or renovation complied with the uniform fire safety standards. Said plans were required to be prepared by licensed architects and engineers for certifications outlined in Attachment "D". These matters were all to be completed prior to the commencement of any revocation or alteration. Petitioner, BOOZER, commenced said improvements prior to said approval. In fact, BOOZER submitted no plans in compliance with these requirements prior to construction. Petitioner, BOOZER, is a licensed builder in the State of Florida, and has been for ten years. BOOZER further acknowledged that at the time of signing and submitting the bid proposal, he certified that he understood the terms of the bid specifications and agreed to be bound by them. TRUST NB-1 attempted to initiate an appeal of the award of the bid to Nottus by submitting a facsimile "notice of protest" to HRS predicated on the award of the bid to Nottus occurring greater than sixty (60) days following the bid opening date. TRUST NB-1 received notice of the award to Nottus on April 18, 1989 and attempted facsimile delivery on April 21, 1989. The facsimile "Written Notice of Protest" was not filed until April 25, 1989. The regular mail receipt of said Notice was received by HRS and filed on April 24, 1989. 38. The "formal written protest" was filed with HRS on May 1, 1989. 39. signature The facsimile Notice of Intent to Protest did not contain of a representative of TRUST NB-1. the original 40. Ernie Wilson is the custodian of records for bid protests for HRS, District 7, and is also the person designated in the bid documents as the contact person for the bid on Lease No. 590:2054. TRUST NB-1 was ranked number four in relation to the five bids submitted. Bidder Micah Savell, not a party to these proceedings, is the next low bidder after BOOZER and Nottus, Inc.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that Respondent enter a final order: (a) Finding the bid of Petitioner, BOOZER, to be unresponsive and that the cancellation of the award by Respondent was justified. Find the bid of Intervenor, NOTTUS to be unresponsive. Find that Petitioner, TRUST NB-1, lacks standing and its protest should be dismissed. Reject all bids. DONE AND ENTERED this 21st day of July, 1989, in Tallahassee, Leon County, Florida. DANIEL M. KILBRIDE Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904)488-9675 Filed with the Clerk of the Division of Administrative Hearings this 21st day of July, 1989. APPENDIX Proposed Findings of Fact by Petitioner, Fred O. Boozer: 1-5 Rejected. 6 and 7 Accepted as incorporated in the Recommended Order. Proposed Findings of Fact by Intervenor, Nottus, Inc. Accepted. Accepted as modified. 3-30. Accepted. 31. The first two sentences rejected as argument and not supported by the evidence. Last sentence in paragraph accepted. 32-40. Accepted. COPIES FURNISHED: Thomas Houck, Esquire 312 South Harbor City Boulevard Suite 1 Melbourne, Florida James A. Sawyer, Esquire District 7 Legal Counsel Department of Health and Rehabilitative Services 400 West Robinson Street Suite 911 Orlando, Florida Sam Power Clerk Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, FL 32399-0700 Gregory L. Coler Secretary Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, FL 32399-0700 John Miller General Counsel Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, FL 32399-0700

Florida Laws (2) 120.53255.25
# 8
NAPLES BUSINESS EQUIPMENT AND SYSTEMS, INC. vs. LEE COUNTY SCHOOL BOARD, 88-000690BID (1988)
Division of Administrative Hearings, Florida Number: 88-000690BID Latest Update: Mar. 30, 1988

The Issue The first issue to be determined is whether the BOARD can reject all bids, with or without cause. The second issue is to determine if the BOARD is required to have cause, was there a sufficient basis for the rejection of all bids in Bid NO. 3996?

Findings Of Fact On December 14, 1987, the BOARD sent invitations to bid to a list of approved vendors in Bid NO. 3996. The purpose of the invitation was to obtain the lowest responsible bid on a purchase of one hundred and fifty typewriters. The bids were to be submitted prior to January 11, 1988 at 2:00 P.M.. They were opened by the BOARD on the same day. OFFICE did not receive an invitation to bid despite its request to be placed on the approved vendor's list in November of 1987. When OFFICE learned of the outstanding invitation to bid, its representative, Mr. Richard Foss, went to the BOARD's Purchasing Department and requested a bid package. The bid documents given to OFFICE mistakenly gave January 14, 1988 at 2:00 P.M. as the deadline for the bid submission. Because of the later date given by the BOARD to OFFICE, the company's bid was received after the opening of the bids. When the results of the bidding were made known at the public bid opening, NAPLES bid was the lowest received. On January 14, 1988, after 10:42 A.M., it was discovered by the BOARD that OFFICE's bid price was lower than the price submitted by NAPLES. At this time, NAPLES bid had not yet been accepted by the BOARD, and no formal announcement had been made awarding the contract to NAPLES. During the BOARD's Purchasing Department's bid analysis, a request was made to reject all bids in Bid NO. 3996. The reason given by Purchasing for the request for rejection was that the specifications were being revised. The bids were rejected on the same date. The written reason sent to the vendors on January 14, 1988 for the bid rejection was that one vendor had been given an incorrect opening date. Attached to the written notice to the vendors was a new bid invitation for Bid NO. 4013. The BOARD explained its mistake was unfair to the one vendor. A new bid opening date was given of February 1, 1988. On January 14, 1988, in addition to the required bid documents, OFFICE submitted a letter which listed additional offerings or incentives that OFFICE would give the BOARD if OFFICE was awarded the contract. These additional purchasing incentives were: wall charts and teacher/student manuals for each typing classroom in the county. OFFICE also informed the BOARD that one of the BOARD's own service personnel was already trained in the servicing of Swintec typewriters. The bid submitted by OFFICE did not meet either the weight or the print wheel specifications as set forth in Bid NO. 3996. The specifications as written in Bid NO. 3996 were not written to eliminate all other typewriters but the Brothers 511-11. Weight specifications required were below the Brother's minimum weight, and at least two other manufacturers provide protected drop-in cassette print wheels in electronic typewriters. The Invitation to Bid contained specific provisions which encouraged the bidding of typewriters other than the Brother 511-11, and set up procedures under which other typewriters, which substantially meet the specifications, could be reviewed on their merits. NAPLES was the lowest responsible bidder for the electronic typewriter contract in the prior school year. The BOARD had rejected all bids at that time because of the decision to consider a different brand of typewriter once bids were opened. A notice of protest was filed by NAPLES, and the BOARD agreed to honor NAPLES bid and award the company the contract. The BOARD revised its bid specifications from last year prior to its solicitations for bids in Bid NO. 3996. The protected drop-in cassette print wheel and the weight requirements were two new technical specifications. During the hearing, the BOARD was unable to determine whether the weight factor or the protected drop-in cassette print wheel requirement will continue to be included in future revisions of the specifications.

Recommendation Based on the foregoing, it is RECOMMENDED: That the BOARD reject the bid submitted by OFFICE as it was nonconforming and sought an advantage not enjoyed by the other bidders. Reinstate the bids which were rejected in Bid NO. 3996, consider the bids, and make an award of the contract to NAPLES. DONE and ENTERED this 30th day of March, 1988, in Tallahassee, Florida. VERONICA D. DONNELLY Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 30th day of March, 1988. COPIES FURNISHED: Stephen Emens, President Naples Business Equipment and Systems, Inc. 859 4th Avenue South Naples, Florida 33940 Harry A. Blair, Esquire 2138-40 Hoople Street Ft. Myers, Florida 33901 Richard Foss, Typewriter Sales Manager 8A-Del Prado Boulevard Cape Coral, Florida 33904 Karl Engel, Superintendent Lee County Public Schools The School Board of Lee County 2055 Central Avenue Fort Myers, Florida 33901

Florida Laws (2) 120.53120.57
# 9
CON-AIR INDUSTRIES, INC. vs SEMINOLE COUNTY SCHOOL BOARD, 98-004714BID (1998)
Division of Administrative Hearings, Florida Filed:Sanford, Florida Oct. 27, 1998 Number: 98-004714BID Latest Update: Jan. 20, 1999

The Issue Whether the School Board of Seminole County's, notice of intent to award Bid No. 102589, for air filter maintenance, service, and replacement to Filter Service and Installation Corporation was clearly erroneous, contrary to competition, arbitrary, or capricious.

Findings Of Fact The Seminole County School District is a political subdivision of the State of Florida, created by Article IX, Section 4, Florida Constitution. The powers and duties of the school board are enumerated in Chapter 230, Florida Statutes. The Superintendent of the Seminole County School District is a constitutional officer, whose office is created by Article IX, Section 5, Florida Constitution. The powers and duties of the Superintendent are enumerated in Chapter 230, Florida Statutes. The Seminole County School Board issued a call for bids for air filter maintenance service and replacement under Bid No. 102589 on September 14, 1998. Bids were submitted by Con-Air Industries, Inc., the protester, and Filter Service & Installation Corp., the apparent low bidder. The bids were opened on September 28, 1998, and were evaluated. Each bidder was determined to be a responsible bidder to the CFB. Intervenor submitted the lowest numerical bid. On October 1, 1998, Respondent's staff recommended that the CFB be awarded to Intervenor. The decision to recommend the award of the filter service Bid No. 102589 complies with the bid specifications. The instructions to bidders, as stated on the Proposal Form, direct a bidder to total lines A-C and to enter the total at line D. The instructions state that a bidder is not to include the cost as stated at lines E & F in the total. The proposal form then states that the total cost, as stated at line D shall be used to determine the apparent low bidder. The bid proposal document stated that the total of the prices stated at items A, B, and C would be used to determine the lowest numerical bid. The bid proposal document stated that the Respondent reserves the right to negotiate unit cost proposed for item E. The line D total submitted by the Petitioner is stated at $3.45. The line D total submitted by the apparent low bidder, is stated at $2.60. Intervenor submitted the lowest numerical bid. Intervenor does business under the fictitious name Filter Sales & Service. That fictitious name has been registered with the Secretary of State for the State of Florida. Filter Service & Installation Corp., and Filter Sales & Service are one and the same. The reference by Intervenor at line F to "Per Price Sheet" and the failure of Filter Service & Installation Corp. to attach a price sheet to its proposal form is not a material deviation from the requirements of the bid specifications. The total at line D is the total used to determine the lowest bidder. Filter Service & Installation Corp. is the lowest and best bid from a responsive and responsible bidder. The Petitioner followed the procedure set forth in the bid proposal document in making a determination that the Intervenor was the lowest numerical bidder. Petitioner reserved the right to reject all bids and to waive any informalities. Petitioner failed to prove that the notice of intent to award the bid to Intervenor was clearly erroneous, contrary to competition, arbitrary, or capricious.

Recommendation Upon the foregoing findings of fact and conclusions of law, it is RECOMMENDED that the Respondent award the contract for filter maintenance, service, and replacement under Bid No. 102589 to the Intervenor, Filter Service and Installation Corp., as recommended by its staff. DONE AND ENTERED this 11th day of December, 1998, in Tallahassee, Leon County, Florida. DANIEL M. KILBRIDE Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 Filed with the Clerk of the Division of Administrative Hearings this 11th day of December, 1998. COPIES FURNISHED: Robert N. Hering, President Con-Air Industries, Inc. 3055 Pennington Drive Orlando, Florida 32804 Ned N. Julian, Jr., Esquire Seminole County Public Schools Legal Services Department 400 East Lake Mary Boulevard Sanford, Florida 32773-7127 Robert W. Smith, Esquire 430 North Mills Avenue, Suite 1000 Orlando, Florida 32803 Dr. Paul J. Hagerty, Superintendent Seminole County Public Schools 400 East Lake Mary Boulevard Sanford, Florida 32773-7127