Findings Of Fact At all times material to these proceedings, the Respondent, David R. Knight, held a registered general contractor's license numbered RG 007907 issued by the State of Florida, Department of Professional Regulation, Construction Industry Licensing Board initially in July, 1968. Respondent's license is presently in an inactive status for failure to renew but renewal can be accomplished by Respondent paying the required renewal fee only. On May 13, 1983, Respondent contracted with Joseph Cobb to remodel a house in Milton, Florida. The contract price was $23,800.00. The Respondent began the remodeling and when the project was approximately 50 percent completed, left the site. Joseph Cobb, on numerous occasions, offered to work with the Respondent in any way to finish the project, but the Respondent failed to return. Joseph Cobb paid Respondent $19,100.00 from May 14, 1983 through June 23, 1983. In addition, although the contract required Respondent to pay for all supplies and materials, Cobb paid $2,300.98 for supplies and material used in the remodeling. Respondent failed to pay Gary Rich Plumbing for the plumbing work done on the Cobb residence. Joseph Cobb was forced to pay Gary Rich $1,200.00 in order to avoid a lien being filed on his home. Respondent was not licensed to contract in Milton, Santa Rosa County, Florida, when he contracted with Joseph Cobb to perform remodeling. In June, 1982, Respondent contracted with Pearlie Rutledge to remodel a house at 608 North D Street, Pensacola, Florida, Escambia County. The contract price was $17,000.00. The Respondent began the construction without obtaining a building permit which is in violation of Section 106 Standard Building Code as adopted by the City of Pensacola Ordinance 81-83. Respondent deliberately and in a hurry left the site of construction when the building inspector appeared on the job. The Respondent was not licensed in Escambia County or the City of Pensacola to practice contracting. Pearlie Rutledge paid Respondent $5,000.00 which the Respondent failed to return when the remodeling was stopped by Charles Humphreys, Housing Inspector for the City of Pensacola. Pearlie Rutledge obtained a Final Judgement against the Respondent for $4,557.00 which has not been paid by the Respondent. Respondent's "81-82' and "82-83", Okaloosa County Occupational License was issued to David Knight doing business as "Your Way Construction." However, there was no evidence presented at the hearing that Respondent ever contracted in the name of "Your Way Construction." In fact there is evidence that during the year 1983 he contracted with Cobb as David Knight, General Contractor and not as David Knight, General Contractor, d/b/a Your Way Construction. (See Petitioner's Exhibit No. 1.)
Recommendation Based upon the findings of fact and conclusions of law recited herein, it is RECOMMENDED that the Board enter a final order Dismissing Counts II, V and VI of the Administrative Complaint filed against the Respondent. It is further RECOMMENDED that the Board enter a final order finding Respondents guilty of the violation charged in Counts I, III and IV of the Administrative Complaint filed against the Respondent and for such violation it is RECOMMENDED that the Board revoke the Respondent's registered general contractor's license numbered RG 0007907, to practice contracting in the State of Florida Respectfully submitted and entered this 9th day of January, 1986, in Tallahassee, Leon County, Florida. WILLIAM R. CAVE Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 FILED with the Clerk of the Division of Administrative Hearings this 9th day of January, 1986. APPENDIX TO RECOMMENDED ORDER IN CASE NO. 84-3836 The following constitutes my specific rulings pursuant to Section 120.59(2), Florida Statutes, on all of the Proposed Findings of Fact submitted by the Petitioner to this case. Rulings on Proposed Findings of Fact Submitted by the Petitioner Adopted in Finding of Fact 1. Exhibit 1). 3. Adopted in Finding of Fact 3. 4. Adopted in Finding of Fact 4. 5. Adopted in Finding of Fact 5. 6. Adopted in Finding of Fact 6. 7. Adopted in Finding of Fact 7. 8. Adopted in Finding of Fact 8. 9. Adopted in Finding of Fact 9. 10. Adopted in Finding of Fact 10. 11. Adopted in Finding of Fact 11. 12. Adopted in Finding of Fact 12. Adopted in Finding of Fact 2 except for contract amount which should have been $23,800. (See Petitioner's Respondent Did Not Submit Any Proposed Findings of Fact COPIES FURNISHED: James Linnan, Executive Director Department of Professional Regulation Construction Industry Licensing Post Office Box 2 Jacksonville, Florida 32202 Charles F. Tunnicliff, Esquire Department of Professional Regulation 130 North Monroe Street Tallahassee Florida 32301 Fred Roche, Secretary Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 Salvatore A. Carpino, General Counsel Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 Mr. David R. Knight 1215 East Hayes Street Pensacola, Florida 32503
The Issue Whether the certified general contractor's license of W. Bert Jones should be revoked.
Findings Of Fact By an Administrative Complaint filed October 27, 1976, the Florida Construction Industry Licensing Board sought to revoke the general contractor's license of W. Bert Jones alleging that the Respondent contractor entered into a contract with Mrs. Barbara Loewe to renovate her home and to add a room onto the back of the house; that the Respondent contractor was paid in full the contract price but the job was not completed and there were numerous building code violations. Respondent requested an administrative hearing. Pursuant to written agreements entered into between the Respondent and Mrs. Barbara Loewe of Tampa, Florida, Respondent agreed to renovate Mrs. Loewe's home and to add a room onto the back of the house. Mrs. Loewe, either by paying the Respondent directly or paying material suppliers, paid the full contract price. In June or July of 1975 the Respondent left the job contracted for partially or wholly incompleted as follows: the ceiling of the kitchen and drywall were in complete and the kitchen was not painted; the guest bathroom was not trimmed; two back rooms were incomplete. Inasmuch as the ceiling was left undone, it was not trimmed, the drywall was incomplete, the doorways were left uninstalled, and the paneling was incomplete; the bathroom had no toilet, no sink and no trim on the tub; in the master bedroom the ceiling was left sagging, there was no insulation in ceiling or walls, the door was untrimmed, siding was left partially undone and the windows weren't trimmed; holes were left unrepaired around the pipes in the home. The sum of Five Thousand Dollars ($5,000) was paid by St. Paul Fire and Marine Insurance Company in full settlement of the claims arising under the general contractor's bond. Additional money, approximately Thirty-Five Hundred Dollars ($3,500), was spent by Mrs. Loewe in addition to the Five Thousand Dollars ($5,000.00) received from the bonding company in order to complete the jobs contracted for. Although there were minimum changes In the job as originally contracted for, work is still going on to complete the original work contracted for by the Respondent. The building inspector for the City of Tampa Building Bureau, Tom Burgoyme, inspected the job site on several occasions during the progress on the work contracted for between Mrs. Loewe and the Respondent. He found building code violations and submitted a list of corrections to the Respondent, Mr. Jones, which were not remedied. A number of problems arose during the construction work, some of which was not the fault of the Respondent. Another contractor was involved in the work on the project. Funds in excess of the purchase price were paid to the Respondent and funds in excess of Eighty-Five Hundred Dollars ($8,500) were needed or will be needed to complete the project.
Recommendation Revoke the general contractor's license of Respondent, Number C GC007323. DONE and ORDERED this 7th day of April, 1977, in Tallahassee, Florida. DELPHENE C. STRICKLAND Hearing Officer Division of Administrative Hearings Room 530, Carlton Building Tallahassee, Florida 32304 (904) 488-9675 COPIES FURNISHED: J. K. Linnan Executive Director Florida Construction Industry Licensing Board Post Office Box 8621 Jacksonville, Florida 32211 Barry Sinoff, Esquire 1010 Blackstone Building Jacksonville, Florida 32202 W. Bert Jones 2300 Greenlawn Street Brandon, Florida 33511
The Issue Whether Respondent violated section 489.13(1), Florida Statutes (2016)1/, by offering, contracting, or performing regulated construction services, for compensation, as charged in the Administrative Complaint; and, if so, what penalty should be imposed.
Findings Of Fact Petitioner is the state agency charged with the licensing and regulation of the construction industry, pursuant to section 20.165 and chapters 455 and 489, Florida Statutes. On September 29, 2016, by letter, the Broward County Environment Protection and Growth Management Department forwarded a complaint to DBPR indicating the subject matter "appears to fall within your area of jurisdiction." The complaint alleged that Ryan D. Kirkland, d/b/a The Shining Light Construction, Inc., represented himself as a licensed contractor, provided a quote, and cashed the check from the victim, Rayon Richards ("Richards"). DBPR assigned Sonya Roa-Zaiter ("Roa-Zaiter"), investigator, to investigate the complaint. During the investigation, Roa-Zaiter interviewed individuals and reviewed several documents to determine Respondent's licensure status and relationship with Richards. Roa-Zaiter discovered that on July 20, 2016, Respondent presented Richards with a written proposal ("proposal") to perform construction work at Richard's rental property, located at 3234 Northwest 31st Terrace, Oakland Park, Florida 33309. In the proposal, Respondent offered to perform regulated services for compensation in the amount of $1,500.00. Specifically, Respondent offered to replace a kitchen faucet, remove a dishwasher, install a new water line and replace exhaust fans. Respondent's proposal listed the company as "State License Insured," but contained the license number CGC 1518408, which is a certified general contractor license number that belongs to Bernard Forges. Bernard Forges did not give Respondent permission to use his license number. Respondent is not licensed and has never been certified or registered as a construction contractor in the State of Florida. Additionally, at all times material to the allegations in this matter, The Shining Light Construction, Inc., has not been an entity properly qualified or licensed in the practice of construction in the State of Florida. Roa-Zaiter also discovered during the investigation that on or about July 22, 2016, Respondent accepted $750.00 as partial payment to perform the services listed in the proposal and cashed the check for the services without performing any of the work. After DBPR completed the investigation, it was determined that Respondent offered to perform a regulated service for compensation without a license contrary to Florida law. On November 1, 2016, DBPR issued Respondent a Notice to Cease and Desist, which notified Respondent that he "may be practicing as a CONTRACTOR (in any trade) without the professional license or certification required by Florida law." On April 25, 2017, DBPR issued an Administrative Complaint charging Respondent with violation of section 489.13(1) for offering to perform regulated construction contracting services for compensation without holding an active and valid certification or registration. Respondent contested the Administrative Complaint and requested a hearing. Roa-Zaiter spent 18 hours and four minutes investigating Respondent's case. DBPR incurred $624.78 for the investigation relating to Respondent's actions in this case, excluding costs relating to any attorney's time.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Business and Professional Regulation enter a final order: finding Respondent, Ryan D. Kirkland, a/k/a Ryan Dee Lon Kirkland, guilty of violating section 489.13(1), Florida Statutes; imposing an administrative fine of $3,000.00; and assessing costs in the amount of $624.78. DONE AND ENTERED this 19th day of January, 2018, in Tallahassee, Leon County, Florida. S JUNE C. MCKINNEY Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 19th day of January, 2018.
Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, the Hearing Officer would recommend that no action be taken against the licenses of K. C. Moore as a registered builder contractor. In addition, the testimony at the hearing revealed that subsequent to the institution of this complaint that Dr. 0. Rao, M.D., did make application to the Florida Construction Industry Licensing Board for licensure as a contractor, that his application was approved, and that upon successful completion of the Board's examination he was licensed. If K. C. Moore is in fact guilty of aiding or abetting or knowingly combining or conspiring with a person to violate Part II, Chapter 468, the person with whom he combined or conspired or who he aided or abetted was Dr. John 0. Rao. Although the Board may be limited under the statutory provisions in denying Dr. Rao the license, assuming the Board rejects the Hearing Officer's Conclusions of Law and finds the facts constitute a violation of the statutory provisions, there is an absence of essential fairness to proceed against the licenses of K. C. Moore while licensing the individual with whom he contracted. The disparity in treatment of K. C. Moore and Dr. John 0. Rao is a factor which must be considered by the Board. DONE and ORDERED this 20th day of July, 1977, in Tallahassee, Florida. STEPHEN F. DEAN, Hearing Officer Division of Administrative Hearings Room 530, Carlton Building Tallahassee, Florida 32304 (904) 488-9675 COPIES FURNISHED: Barry Sinoff, Esquire 1010 Blackstone Building Jacksonville, Florida 32202 R. Stephen Miles, Jr., Esquire Mile and Cumbie Post Office Box 517 Kissimmee, Florida 32741 Mr. J. K. Linnan Executive Director Florida Construction Industry Licensing Board Post Office Box 8621 Jacksonville, Florida 32211 ================================================================= AGENCY FINAL ORDER ================================================================= STATE OF FLORIDA FLORIDA CONSTRUCTION INDUSTRY LICENSING BOARD FLORIDA CONSTRUCTION INDUSTRY LICENSING BOARD, Petitioner,
The Issue The issue in this case is whether Respondent violated provisions of statutes governing licensure of construction contractors and, if so, what penalties should be imposed.
Findings Of Fact The Department is the state agency charged with regulating the practice of construction contracting pursuant to section 20.165, and chapters 455 and 489, Part I, Florida Statutes. Unless specifically stated herein, all references to Florida Statutes will be to the 2014 version. Respondent is not licensed to practice construction contracting in the State of Florida. Neither Respondent nor his putative company, Troche’s Construction, Inc., has an active license as a construction business in this state. On or about October 31, 2012, Respondent entered into a “proposal” with Paul R. Schettino (the “Owner”) to construct a firewall across the Owner’s place of business. The proposal called for Respondent to build “an approx. 48 ft wall, to be firerocked 5/8 drywall on both sides. Studs to be 3 5/8 metal. To be built and ready for paint.” The cost of the work was to be $2,200. (One of the Department’s exhibits indicates a price of $1,650 for the work, but the actual cost is irrelevant.)
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that a final order be entered by Petitioner, Department of Business and Professional Regulation, finding Respondent, Raul Troche, guilty of engaging in the business of construction contracting without a license. It is further recommended that the final order impose a minimal fine or, in the alternative, issue a notice of noncompliance. DONE AND ENTERED this 8th day of December, 2014, in Tallahassee, Leon County, Florida. S R. BRUCE MCKIBBEN Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 8th day of December, 2014. COPIES FURNISHED: Stephen M. Masterson, Esquire Department of Business and Professional Regulation 1940 North Monroe Street, Suite 42 Tallahassee, Florida 32399 (eServed) Raul Troche 70 Belleaire Drive Palm Coast, Florida 32137 J. Yvette Pressley, Hearing Officer Department of Business and Professional Regulation 1940 North Monroe Street, Suite 42 Tallahassee, Florida 32399 (eServed) J. Layne Smith, General Counsel Department of Business and Professional Regulation 1940 North Monroe Street, Suite 42 Tallahassee, Florida 32399 (eServed)
Findings Of Fact Findings of Fact 1-13 are made based upon the Stipulation of the parties filed on July 10, 1987. Respondent is, and was at all times material to the pending amended administrative complaint, a certified building contractor having been issued license number CB CAO9793 by the Florida Construction Industry Licensing Board. At all times material the pending amended administrative complaint Respondent's certified building contractor license (CB CAO9793) qualified "George E. Longino and Associates, Inc." with the Florida Construction Industry Licensing Board. Respondent is, and was at all times material to the pending amended administrative complaint, a certified air conditioning contractor having been issued license number CA CO24348 by the Florida Construction Industry Licensing Board. At all times material to the pending amended administrative complaint, Respondent's certified air conditioning contractor license (CA CO24348) qualified "George E. Longino and Associates, Inc." with the Florida Construction Industry Licensing Board. Respondent is, and was at all times material to the pending administrative complaint, a registered mechanical contractor having been issued license number PM 0031246 by the Florida Construction Industry Licensing Board. At all times material to the pending administrative complaint, Respondent's mechanical contractor license qualified "J. C. and Sons, Inc." with the Florida Construction Industry Licensing Board. At no time material to the pending amended administrative complaint was Respondent the qualifying agent for "First City Contractors, Inc." as defined by Sections 489.105(4) and 489.119, Florida Statutes. At no time material to the pending amended administrative complaint was Charles L. Crowe registered, certified or otherwise licensed by the Florida Construction Industry Licensing Board. At no time material to the pending amended administrative complaint was "First City Contractor's, Inc." registered, certified or otherwise licensed by the Florida Construction Industry Licensing Board. On or about January 23, 1986, Charles L. Crowe d/b/a First City Contractors, Inc., contracted with Steve Bell to construct a room addition at 3110 Carrevero Drive West, Jacksonville, Florida. The contract price was approximately $25,000. On or about March 10, 1986, the City of Jacksonville, Building and Zoning Inspection Division, issued building permit number 6196 to George E. Longino and Associates, Inc. The above referenced building permit was for the construction of a room addition at the residence of Steve Bell, 3110 Carrevero Drive West, Jacksonville, Florida. The following Findings of Fact are based upon the evidence introduced at formal hearing. In December, 1985, or January, 1986, Charles L. Crowe, sole owner of First City Contractors, Inc., approached Longino and asked him to become a partner in the business and to pull permits and be the qualifying agent for First City Contractors, Inc. Longino advised Crowe that he would not be interested in doing that until he had resolved certain pending problems with his licenses. Specifically, the Construction Industry Licensing Board had filed a disciplinary action against Respondent's licenses and that case had been heard and a Recommended Order entered on October 30, 1985. The Recommended Order was scheduled to be considered by the Construction Industry Licensing Board on January 9, 1986. Longino did agree to pull permits for any job on which he would be paid to supervise the construction. Longino did pull the permit and supervise the construction of a garage addition in Arlington, Jacksonville, Florida, for First City Contractors in January or February, 1986. On January 23, 1986, Charles L. Crowe, doing business as First City Contractors, Inc., entered into a contract with Steve Bell to construct a room addition to a residence located at 3110 Carrevero Drive, Jacksonville, Florida. The contract price was $25,000. Based upon the contract, Crowe asked Longino to use his license number to sign a permit application for the Bell job. Longino used a building permit application form which he had in his truck and filled in the pertinent information on the building permit application. Specifically, Longino filled in the name of the licensed contractor as "First City Contractors, Inc." and signed his name as the licensee with license number CB CA09793. Longino signed the building permit application on or about the last week of January, 1986. Financing was not secured for the Bell job until March, 1986. On March 10, 1986, Crowe used the permit application which had been previously signed by Longino and sent an employee of First City Contractors, Inc., Robert Cumpston, to secure a building permit from the City of Jacksonville for the Bell job. Specifically, permit number 6196 was issued based upon the permit application which had been previously signed by Longino. On February 19, 1986, the Construction Industry Licensing Board entered a Final Order suspending Longino's licenses. Longino received notice of the suspension on February 24, 1986, by certified mail. Longino advised Crowe that his licenses had been suspended within a few days following receipt of the Final Order. Despite the knowledge that Longino's licenses had been suspended, Crowe used the presigned building permit application to secure a building permit for the Bell job on March 10, 1986. Building permit number 6196 was issued to Longino's license number doing business as George E. Longino and Associates, Inc. The name of the business was changed from that which was stated on the building permit application because Longino was not a qualifying agent for First City Contractors, Inc. He was only a qualifying agent for George E. Longino and Associates, Inc. A permit could not be issued to First City Contractors, Inc. using Longino's license number. The Bell job was completed using permit number 6196. Longino did supervise that construction and was present at the site on a daily basis. Permit number 6196 was posted at the site. Despite Longino's statements that he did not know that the permit was issued to his license number, it is found that Longino knew or should have known that permit number 6196 was issued to his license number, doing business as George E. Longino and Associates, Inc. Longino did nothing to remedy the problem even though his licenses had been suspended.
Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Professional Regulation, Construction Industry Licensing Board, enter a Final Order suspending the licenses of George E. Longino for a period of one (1) year in addition to the previous suspension. DONE and ENTERED this 11th day of August, 1987, in Leon County, Tallahassee, Florida. DIANE K. KIESLING Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 11th day of August, 1987. COPIES FURNISHED: Van Poole, Secretary Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32399-0750 Fred Seely Executive Director Construction Industry Licensing Board Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32399-0750 W. Douglas Beason, Esquire Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32399-0750 William Bruce Muench, Esquire 438 East Monroe Street Jacksonville, Florida 32201 =================================================================
Findings Of Fact The Respondent, Marlene E. Lutman, is a vice president of American Custom Builders, Inc. and was a vice president in 1977. Respondent holds licenses Number CR C012570 end Number CR CA12570 issued by the Petitioner Board. On September 11, 1978, Respondent submitted a certification change of status application to the Florida Construction Industry Licensing Board. This application, completed by Respondent under oath on September 7, 1978, was filed for the purpose of changing the contractor's licenses held by Respondent to add the name of American Custom Builders, Inc. to said licenses. On July 6, 1979, an Administrative Complaint was filed against Respondent, doing business as American Custom Builders, Inc., seeking to permanently revoke her licenses and her right to practice under said licenses and to impose an administrative fine in the amount of $500.00. Respondent Lutman requested an administrative hearing, which was scheduled for September 6, 1979, continued on Motion of Respondent, and held November 29, 1979. On the application completed by Respondent, Question 12(b) asked: Are there now any unpaid past-due bills or claims for labor, materials, or services, as a result of the construction operations of any person named in (i) below or any organization in which such person was a member of the personnel? Question 12(c) of the application asked: Are there now any liens, suits, or judgments of record or pending as a result of the construction operations of any person named in "(i) below" or any organization in which any such person was a member of the personnel? Respondent, as a vice president of American Custom Builders, Inc., was designated in "(i) below." She answered "no" on the application to both of the above stated questions. Respondent completed the application while she was in Florida. Prior to completing the application, Respondent spoke by telephone with John D. Cannell, an attorney in Ohio, in reference to Questions 12(b) and 12(c), supra. Cannell told Respondent that there were no unpaid bills outstanding. He said that there had been liens filed involving American Custom Builders, Inc., but that these liens had been cancelled. Cannell based his statements to Respondent upon oral assurances from personnel at the bank involved in financing the construction project associated with the liens that all liens had been paid. It was later learned that on September 7, 1978, the date Cannell told Respondent the liens had been cancelled, the liens had not been cancelled and were of record in the Recorder's Office of Geauga County, Ohio. Liens had been filed on January 6, 1978, January 23, 1978, and January 3l, 1978, by various subcontractors involved in the construction of a house owned by Winford and Sally Ferrentina. The liens were based on claims against American Custom Builders, Inc. as general contractor and the Ferrentinas as owners for unpaid labor and materials and were not satisfied of record until September 20, 1978, on which date the January 6, 1978 lien was satisfied, and March 22, 1979, on which date the other two (2) liens were satisfied. The Hearing Officer finds that Respondent Lutman did not intend to make a material false statement but negligently relied on oral representations that there were no past-due bills and no liens of record pending as a result of her construction operations. Both parties submitted proposed findings of fact, memoranda of law and proposed recommended orders, and the Petitioner Board submitted a reply memorandum. These instruments were considered in the writing of this order. To the extent the proposed findings of fact have not been adopted in, or are inconsistent with, factual findings in this order they have been specifically rejected as being irrelevant or not having been supported by the evidence.
Recommendation Based upon the foregoing Findings and Conclusions of Law, the Hearing Officer recommends that the Respondent, Marlene Lutman, be reprimanded. DONE and ORDERED this 1st day of February, 1980, in Tallahassee, Leon County, Florida. COPIES FURNISHED: Jeffery B. Morris, Esquire 2400 Independent Square One Independent Drive Jacksonville, Florida 32202 Jeffrey R. Garvin, Esquire 2532 East First Street Post Office Box 2040 Fort Myers, Florida 33902 DELPHENE C. STRICKLAND Hearing Officer Division of Administrative Hearings Room 101, Collins Building Tallahassee, Florida 32301 (904) 488-9675 ================================================================= AGENCY FINAL ORDER ================================================================= BEFORE THE FLORIDA CONSTRUCTION INDUSTRY LICENSING BOARD FLORIDA CONSTRUCTION INDUSTRY LICENSING BOARD, Petitioner, vs. DOAH CASE NO. 79-1546 Marlene Lutman, CR C012570, CR CA 12570 Respondent, /
The Issue The issue to be resolved in this proceeding involves whether the Respondent's certification to practice contracting should be subjected to disciplinary action for alleged violations of Section 489.129(1), Florida Statutes, and, if the violations are proven, what, if any, penalty is warranted.
Findings Of Fact The Petitioner is an agency of the State of Florida charged, as pertinent hereto, with enforcing, administering, and regulating the practice standards and licensure standards for the construction industry in Florida. This authority is embodied in the various provisions of Chapters 489, 455, and 120, Florida Statutes, and rules promulgated pursuant thereto. The Respondent is a licensed general contractor in the State of Florida having been issued license number RG0060516 and is registered to conduct contracting business in his individual capacity. On July 2, 1990, a contractor, Lonnie J. Walker, notified the Building Department of the City of Tallahassee that he had withdrawn as contractor for a job located at 722 Dunn Street, in Tallahassee, Florida. He thereupon withdrew the building permit he had obtained for the work being performed at those premises. On August 8, 1990, the Respondent contracted with Mary N. Spencer, the owner, to make certain repairs at the two-unit apartment building located at 722 Dunn Street, Tallahassee, Leon County, Florida. The contract price agreed upon between the Respondent and Ms. Spencer was $867.00. The Respondent thereupon performed some of the aforementioned contracting work, consisting of repairs of various types. He was not registered to contract in Leon County, Florida, however. The Department of Growth and Environmental Management of Leon County, Florida, is responsible for issuing construction contractor licenses for the County, including for the City of Tallahassee. There was no proper building permit issued for the job and job site when the Respondent entered into the contracting work at those premises. The Respondent failed to obtain a permit for the repairs and this ultimately came to the attention of the City of Tallahassee Building Department. That agency issued a stop work order on September 5, 1990. The Respondent was not performing work pursuant to Mr. Walker's previous permit, which had been withdrawn. The Respondent was not an employee of Lonnie J. Walker, the previous general contractor for the job. The Petitioner agency submitted an affidavit after the hearing and close of the evidence, with its Proposed Recommended Order. That affidavit asserts that the Petitioner accumulated $458.10 in investigative costs and $2,491.30 in legal costs associated with the prosecution of this case, for a total alleged cost of prosecution of $2,949.40. It moves, in its Proposed Recommended Order, that payment of the costs should be made in accordance with Section 61G4-12.008, Florida Administrative Code. The request for costs was first raised as an issue in the Proposed Recommended Order submitted by the Petitioner and is advanced only in the form of a hearsay affidavit. No prior motion for costs served upon the Respondent is of record in this proceeding.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that a Final Order be entered by the Construction Industry Licensing Board finding the Respondent guilty of the violations charged in the Administrative Complaint and assessing a penalty in the form of a letter of guidance and an aggregate fine of $600.00, as described with more particularity hereinabove. DONE AND ENTERED this 9th day of March, 1994, in Tallahassee, Florida. P. MICHAEL RUFF Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 10th day of March, 1994. APPENDIX TO RECOMMENDED ORDER, CASE NO. 92-591 Petitioner's Proposed Findings of Fact 1-8. Accepted. Respondent's Proposed Findings of Fact Respondent submitted no post-hearing pleading. COPIES FURNISHED: G.W. Harrell, Esquire Department of Business and Professional Regulation 1940 North Monroe Street Suite 60 Tallahassee, FL 32399-0792 Julius S. Baker, Sr. Box 253 Morrow, GA 30260 Mr. Richard Hickok Executive Director Construction Industry Licensing Board Department of Business and Professional Regulation 7960 Arlington Expressway Suite 300 Jacksonville, FL 32211-7467 Jack McRay, Esq. General Counsel Department of Business and Professional Regulation 1940 North Monroe Street Suite 60 Tallahassee, FL 32399-0792
Findings Of Fact The Respondent is a certified general contractor holding license number CG C016888. The Petitioner is an agency of the State of Florida charged with enforcing the provisions of Chapter 489, Florida Statutes, regulating the licensure and practice status and standards of building contractors in the State of Florida and enforcing the disciplinary provisions of that chapter. On December 14, 1981, Respondent contracted with Mr. and Mrs. Frank J. Sullivan to build the Sullivans a home in Sarasota County, Florida. Those parties entered into a contract whereby the Respondent was to be paid the actual cost of construction including all labor and materials plus a commission in the amount of 8 percent of the actual cost of construction, provided however, that the total contract price would not exceed $49,000, including actual costs and commission. In January, 1982, Respondent commenced work constructing the home. The Respondent worked on the home for several months and then abruptly ceased and abandoned construction without explanation on May 14, 1982. At this time the house was approximately 70 percent complete. At the time the Respondent ceased work on the project he had already been paid $47,362.29 or approximately 97 percent of the total contract price agreed to by the parties. The Sullivans thereafter had to pay $10,633.53 to subcontractors and materialmen who had been hired by the Respondent to supply labor and/or materials to the house, at the Respondent's direction, prior to his ceasing construction and leaving the job. Additionally, the Nokomis Septic Tank Company, Inc., the subcontractor who installed the septic tank, was owed $1,180.07 by the Respondent for the installation of the septic tank, which amount was to have been paid out of the total $49,000 contract price. The Respondent failed to pay Nokomis Septic Tank Company, which then filed a mechanic's lien on the property. In order to remove this cloud on their title to the property and avoid foreclosure of the lien, the Sullivans were forced to pay the $1,180.07 amount of the lien. In addition to more than $10,000 paid to subcontractors who had already performed labor or supplied materials to the job before the Respondent left it, the Sullivans had to obtain a loan from their bank in order to finish the project. The contracted for items which the Respondent had left undone (approximately 30 percent of the construction) required them to expend $18,662.04 to complete the dwelling in a manner consistent with the contractual specifications. The items which remained to be constructed or installed are listed on Petitioner's Exhibit 7 in evidence. The remaining amount of contract price which the Respondent was due upon completion of the job would have been $1,737.71. With this in mind, as well as the fact that the Sullivans had to pay in excess of $10,000 to defray already outstanding bills to subcontractors for labor and materials already furnished and then had to obtain a loan in order to pay $18,662.04 in order to complete the house, and it being established without contradiction that the Respondent was unable to make his payroll at the point of leaving the job, the Respondent obviously used substantial amounts of the funds he received from the Sullivans for purposes other than furthering the construction project for which he contracted with the Sullivans. Concerning Count II, on December 22, 1981, Frederick Berbert doing business as Venice Enclosures of Venice, Florida, contracted with Mr. Emory K. Allstaedt of Grove City, Florida, Charlotte County, to build an addition to Mr. Allstaedt's mobile home. The contract specified a price of $4,952 for which Berbert was required to construct a 12-foot by 20-foot enclosure or porch. Mr. Allstaedt never did and never intended to contract with the Respondent, Mr. Martin, rather, his contract was only with Frederick Berbert. Mr. Berbert was a registered aluminum specialty contractor in Sarasota County. He was not registered or licensed to practice contracting in Charlotte County where Mr. Allstaedt lived and where the porch was to be constructed. On December 28, 1981, the Respondent obtained building permit number 72030 from the Charlotte County Building and Zoning Department to construct a "Florida room" for Mr. Allstaedt's mobile home, the same room to be constructed by Mr. Berbert. Under Charlotte County Ordinances in evidence as Petitioner's Exhibits 13 and 13A, only a properly licensed "A", "B" or "C" contractor or a registered aluminum contractor can perform this type of job. The Respondent was appropriately licensed for this type of work in Charlotte County, but Mr. Berbert was not and thus could not obtain the permit in his own right. The Respondent's only connection with this job was obtaining the permit in his own name as contractor of record and in performing some minor work in replacing some damaged sheets of paneling shortly after the construction of the room addition and after the performance of the contract by Berbert. Though the Respondent listed himself as contractor in order to be able to obtain a building permit for the job, he never qualified as the contractor of record nor "qualified" Mr. Berbert's firm with the Construction Industry Licensing Board. Both Mr. Berbert and the Respondent were aware that Mr. Berbert could not legally perform contracting in Charlotte County at the time the Respondent obtained the building permit on Berbert's behalf.
Recommendation Having considered the foregoing Findings of Fact and Conclusions of Law, the evidence of record and the candor and demeanor of the witnesses, it is, therefore RECOMMENDED: That the contractor's license of Jack A. Martin be suspended for a period of ten (10) years, provided however, that if he makes full restitution to the Sullivans of all monies they expended for labor, materials and permits to enable them to complete the work he had contracted to perform, within one year from a final order herein, that that suspension be reduced to three (3) years after which his license should be reinstated. DONE and ENTERED this 27th day of April, 1984, in Tallahassee, Florida. P. MICHAEL RUFF Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 30th day of April, 1984. COPIES FURNISHED: Charles P. Tunnicliff, Esquire Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301 Mr. Jack A. Martin 305 Park Lane Drive Venice, Florida James Linnan, Executive Director Florida Construction Industry Licensing Board Post Office Box 2 Jacksonville, Florida 32202 Fred M. Roche, Secretary Department of Professional Regulation 130 North Monroe Street Tallahassee, Florida 32301
Findings Of Fact The parties stipulated to the fact that James Baskin holds registered contractor's license number BC 0011300. Raskin's registered general contractor's license was issued by the Florida Construction Industry Licensing Board. Prior to the commencement of the hearing, the Hearing Officer held that the record of the proceedings for the Cape Coral Board could be filed as a late filed exhibit in this cause in order that the Florida Construction Industry Licensing Board could review the Cape Coral Board's action pursuant to its authority under Section 468.112(2)(f), Florida Statutes. Ambassador Homes contracted with Sam and Marie Franzella for the construction of a single family residence to be constructed on the property located on Lots 41-42, Block 1224, Cape Coral Unit 19, Section 32-33, Township 44 South, Range 24 East. Stucky Well Drilling was initially contacted by an unknown agent of Ambassador Homes on January 1, 1975, and directed to drill a well, and install a deep well jet pump and tank at the location stated above. On January 20, 1975, Marion, a secretary for Ambassador Homes, called Stucky Well Drilling and directed that Stucky Well Drilling install the well and equipment as soon as possible. On January 21, 1975, a 210 foot well was drilled on the property described above and on January 23, 1975, a Mr. Green from Ambassador Homes called and requested that the tank and equipment be installed immediately. Mr. Hall, an employee of Stucky Well Drilling, installed all the equipment as ordered on January 23, 1975. On January 24, 1975, a bill in the amount of Six Fifty Dollars ($650.00) was sent to Ambassador Homes for the work performed on the property described above. Ambassador Homes was a corporation engaging in residential contracting and operating under the license of James Raskin. Ambassador Homes did not pay Stucky Well Drilling the bill for the drilling of the well and installation of the equipment on the property described in paragraph 3 above. Subsequently Stucky Well Drilling brought suit against Ambassador Homes, Inc., in the County Court of Lee County and obtained final judgment in the amount of Six Hundred Fifty Dollars ($650.00) plus costs. This judgment was entered on December 2, 1975.
Recommendation Based on the foregoing findings of fact and conclusions of law, the Hearing Officer recommends that the Florida Construction Industry Licensing Board suspend the license of James Raskin as a registered general contractor until he presents satisfactory proof to the Board of his financial qualifications to engage in the contracting business. DONE and ORDERED this 27th day of May, 1977, in Tallahassee, Florida. STEPHEN F. DEAN Hearing Officer Division of Administrative Hearings Room 530, Carlton Building Tallahassee, Florida 32304 (904) 488-9675 COPIES FURNISHED: Barry Sinoff, Esquire 1010 Blacks tone Building Jacksonville, Florida 32202 James Raskin 1810 S. E. 44th Street Cape Coral, Florida 33904 Mr. J. K. Linnan Executive Director Florida Construction Industry Licensing Board Post Office Box 8621 Jacksonville, Florida 32211