The Issue The issue in this case is whether the evidence sustains the decision of the City of Clearwater Development Code Adjustment Board (the Board) to grant the application of the Appellant, the City of Clearwater for dock length, width and setback variances to allow the reconstruction of the public pier facility located at the west end of Magnolia Drive in Clearwater, Florida. (The pier was destroyed by the "No Name Storm of the Century" on March 12-13, 1993.)
Findings Of Fact On or about September 1, 1993, the City of Clearwater applied to the City of Clearwater Development Code Adjustment Board (the Board) for dock length, width and setback variances to reconstruct the public pier facility located at the west end of Magnolia Drive in Clearwater, Florida, where it terminates at the waterfront in an "aquatic lands/coastal zoning district." The pier was 91.5 feet in length and 40 feet in width; it was set back 12.5 feet from the extension of the adjacent property lines. It was destroyed by the "No Name Storm of the Century" on March 12-13, 1993. Since the site has 65 feet of waterfront, reconstructing it to its previous dimensions requires variances of: (1) 59 feet in dock length (over the 32.5 feet allowed by the City of Clearwater Development Code); (2) 17.25 feet in dock width (over the 22.75 feet allowed by the Code); and (3) 7.5 feet reduction in setback from the extended adjacent property lines (below the 20 feet required by the Code.) Before its destruction, the public pier at the west end of Magnolia Drive in Clearwater had been in existence for many years. (The original version was built in approximately 1915.) The evidence is that the community at large desires to reconstruct the pier to its former dimensions. The old pier has historic and sentimental significance. It also serves as a recreational facility for residents without private access to a dock on the waterfront. Especially in the last several years before its destruction, public use of the old pier brought with it problems of misuse, loitering, litter, noise, trespassing, and crime. The police did not have the resources to prevent these problems. Criminal activity in the area seems to have decreased since the destruction of the old pier. As a result, the property owners closest to the pier do not want the public pier reconstructed at all, and certainly do not want it reconstructed to its former dimensions. They oppose the variance application. The conditions imposed by the Board (no deviation from the proposed materials and building plan, the erection of signs as to closing times to be enforced by the police, proper lighting, and the installation of an electronic safety system, including a gate, to be monitored by the police) will help alleviate many of the concerns of the neighboring property owners but are not guaranteed to eliminate them in their entirety. The water is shallow in the vicinity of the site, and a dock of a certain length is necessary for the dock to be used for boats of any appreciable size and draft. However, this condition is not unique to the particular site in question, but is uniformly applicable all along the City waterfront, and there was no evidence as to the length of dock required for adequate water depth for use by boats. There is no competent, substantial evidence in the record from which it could be found that the granting of the variances will not be materially detrimental or injurious to other property or improvements in the neighborhood in which the property is located. There is no competent, substantial evidence in the record from which it could be found that the granting of the variance will not impair the value of surrounding property.
Findings Of Fact Upon consideration of the oral and documentary evidence adduced at the hearing, the following relevant facts are found: Respondent owns real property located in Township 2 North, Range 7 East, Section 32, in Madison County, Florida, that has surface water flowing through it and is encompassed within what is defined as "wetlands." Respondent is in control and possession of the property in question and all work on the property that is material to this proceeding is under the control or direction of the Respondent. There were access roads on the property as early as 1973 as reflected by Respondent's exhibit 2, a 1973 aerial photograph, but the width of the roads or the existence of ditches or culverts cannot be determined from the photograph. Petitioner's exhibit 2, a 1981 aerial photograph, shows the roads still in existence in 1981 but the width of the roads or existence of ditches or culverts cannot be determined from the photograph. Sometime before the Respondent purchased the property and began construction to expand the roads, ditches and culverts were in place; however, there was no evidence as to when the ditches and culverts came to be in place. A 1976 survey of the property reflects 60 foot roads which were to provide access to platted but unrecorded lots. These roads had not been constructed when Respondent purchased the property or began construction to expand the roads. The newly constructed portions of the road indicates an attempt to build the roads in accordance with the 1976 survey. The previously existing roads attempted to follow the natural contour of the land and as a result were not always straight, and only had a negligible effect on the flow or storage of surface water in regard to the property. Sometime around October 1987, Respondent began to rebuild and construct roads on the property by straightening existing curves, removing fill material from adjacent wetlands to widen and heighten the existing roadbed or construct a new roadbed, and to increase the depth and width of existing ditches or dig new ditches. The initial portion of the existing road providing access to the property from the county graded road has been substantially rebuilt with portion of the roadbed being 40 to 43 feet wide. Ditches along this portion of the roadbed have had their width increased up to 14 feet and their depth increased up to 6 and 8 feet. Other portions of the road has been expanded beyond the previously existing roadbed by increasing the width and height of the roadbed. The increased size of the ditches and the expanded roadbed has increased the interception of surface water above that already being intercepted by the previous roadbed and ditches and, as a result, there is an increased amount of surface water impounded or obstructed. The effect is that surface water is removed from Respondent's property at a faster rate than before road construction began and, as a result, sheet flow of surface water is decreased which diminishes the storage of surface water on the property. Although new culverts were installed during road construction, there was insufficient evidence to show that these new culverts were in addition to the culverts already in place or if they replaced old culverts. There was insufficient evidence to show that the new culverts allowed water to flow in a different direction or be removed from the property at a faster rate than before or if they impounded or obstructed surface water more so than before. The previously existing roads had sufficiently served an earlier timber harvest on the property and, by Respondent's own testimony, were sufficient for his ongoing hog and goat operation. The extensive rebuilding and constructing of roads in this case was neither necessary nor a customary practice for construction of farm access roads in this area. Respondent is engaged in the occupation of agriculture in that he has a bona fide hog and goat operation. However, Respondent's silviculture occupation is somewhat limited in that he is presently harvesting the timber but shows no indication of replanting or continuing the forestry operation upon completing the present harvesting operation. The extensive rebuilding and constructing of roads in this case goes beyond what is necessary or is the customary practice in the area for a hog or goat operation or forestry operation such as Respondent's and is inconsistent with this type of agriculture or silviculture occupation. Respondent has never applied for nor received a surface water management permit from the Petitioner even though the Petitioner has informed Respondent that a permit was required for the work being done on his property. The present alteration of the topography of the land by Respondent has obstructed and impounded surface water in such a fashion that the interruption of the sheet flow of surface water has been increased, causing the storage of surface water on the property to be diminished. At the present time, Respondent has been enjoined by the Circuit Court of Madison County, Florida, from any further activity on this project. However, should Respondent be allowed to complete this project, it is evident that the sole and predominant purpose would be to impound and obstruct the sheet flow of surface water and diminish the storage of surface water on the property in question.
Recommendation Having considered the foregoing Findings of Fact, Conclusions of Law, the evidence of record and the candor and demeanor of the witnesses, it is, therefore, RECOMMENDED that the Petitioner, Suwannee River Management District, enter a Final Order requiring Respondent, Norman Leonard, to: (a) remove all unauthorized fill material placed within jurisdictional wetlands and return those areas to predevelopment grades and revegetate with naturally occurring local wetlands species to prevent erosion; (b) back fill excavated swale ditches, return road beds and excavated ditches to predevelopment condition and grades and seed disturbed non-wetland areas with a 50:50 mix of bahia and rye grass and; (c) refrain from any other development until and unless a required permit is obtained for such development. Respectfully submitted and entered this 13th day of February, 1989, in Tallahassee, Leon County, Florida. WILLIAM R. CAVE Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 13th day of February, 1989. APPENDIX TO RECOMMENDED ORDER IN CASE NO. 88-1445 The following constitutes my specific rulings pursuant to Section 120.59(2), Florida Statutes, on all of the Proposed Findings of Fact submitted by the parties in this case. Specific Rulings on Proposed Findings of Fact Submitted by Petitioner 1. Adopted in Finding of Fact 1. 2.-3. Adopted in Finding of Fact 2. 4.-7. Are unnecessary findings for this Recommended Order. Adopted in Finding of Fact 18. Adopted in Finding of Fact 19. Adopted in Finding of Fact 10. Adopted in Finding of Fact 11. Subordinate to the facts actually found in this Recommended Order. Adopted in Finding of Fact 11. Adopted in Finding of Fact 12. Rejected as conclusions of law. Adopted in Findings of Fact 3 and 4. Adopted in Finding of Fact 8. Adopted in Finding of Fact 9. Adopted in Finding of Fact 9. Adopted in Finding of Fact 8. Adopted in Finding of Fact 6. Adopted in Finding of Fact 7. Adopted in Finding of Fact 6. Adopted in Finding of Fact 10. Adopted in Findings of Fact 15 and 17. 26.-29. Adopted in Finding of Fact 12. 30. Adopted in Finding of Fact 13. 31.-32. Subordinate to facts actually found in this Recommended Order. Adopted in Finding of Fact 12. Adopted in Finding of Fact 16. 35.-38. Subordinate to facts actually found in this Recommended Order. 39.-42. Rejected as not being relevant or material. Specific Rulings on Proposed Findings of Fact Submitted by Respondent 1. The first paragraph adopted in Finding of Fact 16. The balance is rejected as a conclusion of law. 2.-3. Rejected as not being relevant or material. Not a finding of fact but a statement of testimony. However, it is subordinate to facts actually found in this Recommended Order. Rejected as not supported by substantial competent evidence in the record. The more credible evidence is contrary to this finding. COPIES FURNISHED: Janice F. Baker, Esquire Post Office Box 1029 Lake City, Florida 32056-1029 Norman Leonard, Pro Se Route 2, Box 172-D Live Oak, Florida 32060 Donald O. Morgan Executive Director Suwannee River Water Management District Route 3, Box 64 Live Oak, Florida Dale H. Twachtmann, Secretary Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32399-2400
The Issue Whether or not Petitioner is entitled to a dredge and fill permit to construct a dock and seawall by provision of reasonable assurances that the project is in the public interest.
Findings Of Fact On May 8, 1989, the Petitioner, Kathryn Haughney, applied to DER for a permit to construct a dock and seawall on the shore of the Halifax River in Volusia County. The portion of the Haughney property where the dock and seawall would be constructed is separated from the Haughney home by John Anderson Drive, which parallels the river's edge and is separated from the river by a ribbon of undeveloped property at that location and to the south. A house is located at water's edge on the lot to the north of the proposed construction site. The Haughney home itself is set well back from John Anderson drive on the side of the street away from the river. The Halifax River is classified as a Class III water body under DER rules. The particular part of the Halifax River where the Haughney property is located and where the dock and seawall are proposed is also within the Tomoka Marsh Aquatic Preserve, which is an Outstanding Florida Water under DER rules. The dock as proposed by Petitioner will be 320 square feet. DER denied the permit application on July 19, 1990, but in so doing did not deny the application on the basis of the proposed dock, which, because of its dimensions, is exempt from DER permitting requirements. The seawall as proposed is to be 137 feet long. Petitioner applied to extend it 16 feet out into waters of the state at the northern end, gradually increasing to 34 feet into waters of the state at the south end. Additionally, 5 feet of riprap would also extend out into waters of the state along the seawall's entire length. The waters of the state that would be filled by the proposed seawall contain lush wetland vegetation that provides habitat for a number of macroinvertebrate species which are part of the food chain feeding fish and wading birds such as egrets and herons. Fiddler crabs and colonies of mussels have been observed on the site. The area to be filled provides a valuable habitat for fish and wildlife. There was no mitigation offered by Petitioner to make up for the loss of habitat to be occasioned by the proposed construction. Although Petitioner asserted DER had named no "endangered species" and that the Environmental Protection Administration had not designated this area as "endangered," those federal concerns were not at issue. If such federally designated species or location designation existed in the locale, it might militate against granting this application for permit, but in the negative, it is irrelevant. A vertical seawall exists immediately north of Petitioner's shoreline. The shoreline to the south remains undeveloped. (See Finding of Fact 2). Construction of seawalls, especially those that extend out from the existing shoreline, typically causes erosion on adjacent shorelines, and additional seawalls exaggerate wave energy and can have a cumulative erosive effect. The foregoing fact is found in reliance upon the testimony of Don Medellin, an Environmental Specialist II for DER, and Barbara Bess, an Environmental Manager for DER, both accepted as experts in environmental aspects of dredge and fill permits. The assertion that actual erosion on the property to the south has already occurred was contained in a letter from Petitioner's southern neighbor (DER Exhibit 6). Petitioner's representatives objected to consideration of this exhibit as "hearsay." They are correct and current erosion to the south is not found as a fact. Nonetheless, actual erosion in a pocket on the north end of Petitioner's shoreline has been shown by the direct testimony of Emmett and Martha Haughney, who assert that their property is eroding due to the existing seawall and that Petitioner wants a permit for a seawall to alleviate this erosion. Their evidence is confirmed by the personal observations and testimony of Mr. Medellin and Ms. Bess. Further, upon their testimony, it is accepted that this minimal pocket of erosion is most likely due to the existing seawall to the north and that if the Petitioner builds a seawall to the specifications now set out in the permit application, there is potential for similar and perhaps cumulative erosion to the shoreline to the south of Petitioner's lot. Neither the city nor county involved has land use restrictions which would prohibit Petitioner's proposed seawall except that Volusia County advocates riprap requirements if this permit application were granted. In its Notice of Permit Denial, DER advised Petitioner as follows: The Department has determined that the follow- ing changes to the project may make the project permittable: The vertical seawall should be eliminated and replaced with coquina rock riprap revet- ment. The riprap should be located further landward and conform to the slope of the existing embankment. Backfilling on the north property line is acceptable provided the fill area does not extend more than 10 feet westward in the most eroded area. Accordingly, the riprap could extend to the adjacent seawall and gradually extend in a more landward direc- tion to prevent excessive elimination of the littoral zone vegetation. Whatever alternative the applicant elects to choose, the removal or elimination of littoral zone vegetation must be offset in the form of mitigation if the impacts can not be reduced any further. Finally, the agent should eliminate the use of generic drawings which must be continually revised. All drawings should reflect the existing and proposed conditions and the impacts associated with the project. Petitioner's contractor, Andy Harris, testified to other alternatives that could be used by Petitioner in constructing her seawall, but the evidence of Mr. Medellin and Ms. Bess is persuasive that the alternative measures proposed by Mr. Harris would not provide the reasonable assurances the law requires DER to obtain from Petitioner.
Recommendation Upon the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Environmental Regulation enter a Final Order affirming its July 19, 1990 Notice of Permit Denial. RECOMMENDED this 25th day of April, 1991, at Tallahassee, Florida. ELLA JANE P. DAVIS, Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 25th day of April, 1991. APPENDIX TO RECOMMENDED ORDER, CASE NO. 90-7215 The following constitute specific rulings pursuant to Section 120.59(2) F.S. upon the parties' respective proposed findings of fact (PFOF): Petitioner's letter to Hearing Officer (filed March 22, 1991) The first paragraph complains that a VCR was unavailable in the hearing room so that Petitioner's videotape could not be shown. Petitioner should have made arrangements for showing the tape and did not. Likewise, Petitioner never offered the tape in evidence (for viewing by the Hearing Officer afterwards in preparation of this Recommended Order). Therefore, it very properly was not considered. The next 3 paragraphs refer to the Casden letter (DER Exhibit 6), which is covered in FOF 8-9. The remaining paragraphs are rhetoric and legal argument upon which no ruling need to made under Section 120.59(2) F.S.; however, they are alluded to in the Conclusions of Law. Petitioner's letter to DER Counsel (filed March 25, 1991 by DER, suggesting it was Petitioner's proposed findings of fact) 1-3 For the reasons set out above, the Petitioner's videotape was not considered. The subject of erosion to the degree proved at the hearing is covered in the Recommended Order. 4-5, PS 1-3 Mere rhetoric and legal argument upon which no ruling need be made under Section 120.59(2) F.S.; covered in the Conclusions of Law to the degree appropriate. Respondent's PFOF: 1-11 Accepted as modified to reflect the greater weight of the credible and probative record evidence as a whole. That which is rejected is rejected as not proven or not persuasive. Unnecessary or irrelevant material has likewise been excluded. COPIES FURNISHED: Douglas MacLaughlin Assistant General Counsel Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Kathryn Haughney 2301 John Anderson Drive Ormond Beach, FL 32074 Emmett and Martha Haughney 2301 John Anderson Drive Ormond Beach, FL 32074 Carol Browner, Secretary Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, FL 32399-2400 Daniel H. Thompson, General Counsel Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, FL 32399-2400
Findings Of Fact Based upon all of the evidence, the following findings of fact are determined: This controversy began on July 9, 1990, when petitioners, David and Victoria Page, filed an application with the district office of respondent, Department of Environmental Regulation (DER), seeking the issuance of a permit authorizing certain construction activities (including the erection of a seawall) on their residential lot located at 3108 Gulfwinds Circle, Hernando Beach, Florida. The property faces west on the Gulf of Mexico, a water body designated as a Class III water in the State. The application was eventually deemed to be complete on October 24, 1990. After conducting a review of the application and an on-site inspection of the property, on January 18, 1991, DER issued its notice of permit denial. The notice identified the reasons for the denial as being petitioners' failure to give reasonable assurances that water quality standards would not be violated and that the project would be in the public interest. Also, DER cited expected adverse cumulative impacts if the application was granted. The notice provided further that if petitioners agreed to locate their seawall landward of the jurisdictional line, the project would be approved. In July 1991, petitioners amended their application to propose that the seawall be constructed even further seaward of the jurisdictional line. When efforts to resolve the case were unsuccessful, petitioners requested a formal hearing on January 17, 1992, to contest the agency's decision. Petitioners purchased their property in 1989. It lies within Unit 2 of Gulf Coast Retreats, a residential subdivision in Hernando Beach, Florida. The property is identified as lot 20 on Gulfwinds Circle and fronts the Little Pine Island Bay (Bay), which is a part of the Gulf of Mexico. Access to the Gulf is provided by a channel (six feet in depth) in the Bay in front of lot 20 and which eventually runs into the Gulf several miles south of petitioners' lot. It is undisputed that in 1985 Hurricane Elena passed offshore causing erosion to lot 20 and other adjacent lots. Consequently, the upland portion of the lot is now smaller than before the hurricane. However, petitioners purchased their property in that state of condition. Lots 19 and 21 are on the south and north sides of petitioners' property and are owned by the Steins and Budricks, respectively. Both neighbors have constructed vertical concrete seawalls in front of their homes. Budrick was issued a permit to construct a seawall on December 28, 1989, while Stein constructed his without a permit. However, Stein has subsequently filed an after-the-fact permit application and was recently advised by DER that the application was complete. At hearing, a DER representative expressed the view that the Stein application will probably be approved since his wall is landward of the DER jurisdictional line. It is noted that the Stein and Budrick seawalls sit back from the original property lines because of the erosion suffered during the 1985 hurricane and correspond to the jurisdictional line established by DER on their property. Another application for a permit to construct a seawall was filed by the owner of lot 18 in March 1992. Like Stein and Budrick, that owner proposed to construct his wall on the landward side of the jurisdictional line. Petitioners, who live in Kansas, desire to construct a home on their lot. They have proposed to place one hundred cubic yards of fill (limerock) on 1,065 square feet of intertidal wetlands on the western end of their lot and construct a 110-foot vertical seawall up to thirty feet seaward of the jurisdictional line. Thus, there will be dredge and filling activities in the Gulf of Mexico, a class III water of the state, thereby invoking the jurisdiction of DER. By law, DER is required to establish a jurisdictional line to show the landward extent of waters of this state, including the Gulf of Mexico. Such extent is normally defined by species of plants or soils which are characteristic of those areas subject to regular and periodic inundation by the waters of the state. As a general practice, using a prescribed plant or species indicator list, DER makes an on-site inspection of the property to determine what vegetation, if any, is found on the property and is subject to regular and periodic inundation by the waters. In this case, the dominant vegetation found on lot 20 was paspalum distichum, a plant on the species list subject to regular and periodic inundation by the Gulf waters. Accordingly, DER observed where the vegetation ended and used that point for the placement of the jurisdictional line. As a cross check, DER also noted the rack line, which is indicative of the landward extent to which the high tides rise, and found it to correspond to the vegetation line. It should be noted that the jurisdictional line established on petitioners' property corresponds with the line drawn on lots 18, 19 and 21, and if that line is used to construct the seawall on lot 20, the seawalls on all four lots would run in a straight line. Although petitioners objected to the jurisdictional line as established by DER, they offered no credible evidence to show that it was improper or should have been placed at a different location. On January 9 and 15, 1991, Richard W. Pugh, a DER field environmental specialist, conducted an on-site inspection of the property and adjacent waters. He also was responsible for establishing the jurisdictional line. Finding numerous adverse environmental effects that would occur if the permit was granted as proposed, Pugh recommended that the application be denied. This recommendation was accepted by the deputy assistant secretary for DER's Southwest District Office and a notice of permit denial was accordingly issued. The bases for the denial were that (a) reasonable assurances had not been given by petitioners that water quality standards would be satisfied; (b) a cumulative adverse impact on the area would occur if the permit was approved, and (c) petitioners had failed to give reasonable assurances that the project was in the public interest. In order to prove entitlement to a permit, petitioners must give reasonable assurance that water quality standards will not be violated and that the project is in the public interest. In this respect, they offered no evidence to provide these assurances. This in itself supports a finding that no entitlement to a permit has been shown. Even so, the agency elected to present evidence on these issues after petitioners' case-in-chief was concluded. Findings of fact drawn from that evidence are set forth below. On April 6, 1992, a DER marine biologist, Dr. George H. Farrell, visited the site and conducted a biological evaluation of the composition of the benthic community in the intertidal and subtidal wetlands which would be impacted by the project. Based on his tests and observations, Dr. Farrell concluded that the project as proposed would have an adverse impact on marine and wildlife resources in the area. This is because the area has very good water quality, contains a high species diversity, performs an integral part in the food web, and serves a valuable nursery function for estuarine dependent juvenile fish species and a corridor function for migrating estuarine dependent fish species. This testimony was not challenged by petitioners and is hereby accepted. 1/ In granting or denying a water resource permit, DER is also required to consider certain statutory criteria found in Subsection 403.918(2), Florida Statutes, to determine whether a project is in the public interest. Although petitioners did not address these criteria, and thus failed to give any assurances that the project is in the public interest as required by law, testimony adduced by DER established that under petitioners' proposal, there will be a permanent loss of 1,065 square feet of intertidal wetlands due to filling activities. These wetlands are now used by fish and wildlife habitat and will no longer be available for use. In addition, the same area is used as a nursery area by a variety of fish species. As such, the project will adversely affect the conservation of fish and wildlife and their habitats and will adversely affect the fishing values and marine productivity in the vicinity. Second, because petitioners' proposed seawall will jut out from their neighbors' walls by as much as thirty feet, and the corners of the seawall in that configuration will result in erosion or shoaling depending on whether the waters are moving north or south, the project will cause harmful erosion or shoaling. Third, because the wall is being constructed of concrete and steel and is not temporary, the project will be of a permanent nature and thus have a permanent adverse impact. Finally, the ecological functions being performed in the immediate vicinity of the project are extremely important and the elimination of this zone will significantly impair those functions. Collectively, these considerations support a finding that the project is not in the public interest. DER has a policy of not granting a permit if adverse cumulative impacts may be expected as a result of granting that permit. This policy is derived from a statute (s. 403.919, F.S.) requiring such impacts to be considered in the permitting process. In the case at bar, DER reasonably predicts that if it granted petitioners' application and authorized them to construct a seawall which jutted out up to thirty feet beyond their neighbors' walls, it would be obligated to grant similar permits to property owners on adjacent lots. Because petitioners' application will have an adverse impact on the water quality and is contrary to the public interest, the granting of additional permits would exacerbate those impacts. When an applicant proposes to fill (destroy) wetlands, and the applicant is unable to meet the public interest criteria set forth in subsection 403.918(2), DER shall consider measures proposed by or acceptable to the applicant to mitigate the adverse effects caused by the project. In this case, no mitigative measures were proposed by petitioners. At hearing, petitioners' representative asserted that in June 1991, the Cabinet (presumably sitting as the Board of Trustees of the Internal Improvement Trust Fund) implemented a new "policy" which allows property owners to "recover and bulkhead" land previously lost due to avulsion and erosion. He further represented that such requests were to be filed within five years after the event (hurricane). Although petitioners were not the property owners when the event occurred, and more than five years has elapsed, in July 1991 petitioners filed a request with the Department of Natural Resources (DNR) to reclaim and bulkhead their property and that request remained pending as of the date of hearing. A copy of the policy itself (or rule, if any, implementing the policy) was not made a part of this record. Even so, there was no evidence to establish that the granting of that application would require DER to grant a water resource permit, and DER takes the position that the request has no bearing on the issue of whether a water resource permit should be issued to petitioners.
Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that a final order be entered denying petitioners' application for a water resource permit. DONE and ENTERED this 27th day of April, 1992, in Tallahassee, Florida. DONALD R. ALEXANDER Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 27th day of April, 1992.
The Issue The issue in this case is whether the DER should exempt the stormwater discharge anticipated from the initial phase of a residential development proposed by Sam Rodgers from the licensing requirements laid down by Rule 17- 4.248, Florida Administrative Code.
Findings Of Fact Sam Rodgers (applicant) proposes to alter an existing stormwater conveyance system in connection with transforming part of an orange grove in Polk County into a residential development, Foxwood Lake Estates. If all goes according to plan, the development will eventually occupy all or parts of four distinct basins. The applicant's agents furnished DER data pertaining to all four basins. The only discharge at issue in these proceedings, however, is the stormwater expected to drain from Basin III. See DER Exhibit No. 1, Master Plan-Key Map. Phase I of the development, a trailer park, would lie completely within the 123-acre expanse of Basin III, but would not completely displace the citrus trees. According to the applicant, roofs, streets, parking lots and other impervious surfaces will comprise some two-fifths of the area, when developed. DER Exhibit No. 1. Construction activity increases suspended solids in stormwater draining from construction sites. Lesser but still elevated levels of suspended solids can be expected when people take up residence. Heavy metals from automobile exhaust will end up in stormwater draining from Basin III, if some of the people moving in bring cars. Residential development also increases the biochemical oxygen demand of stormwater washing over it. The applicant proposes sodded roadside swales of varying slope to collect stormwater and, together with occasional pipes under roads, to convey it to an existing pond (Foxwood Lake), which is to be enlarged to an area of 4.82 acres. Foxwood Lake would be 12 feet deep in places. Testimony that the swales and pond would fill with silt in two or three years has not been credited, although it may not take centuries, as another expert testified. The swales will require maintenance and the applicant plans to hire somebody for that purpose. The applicant also contemplates dedicating some road rights-of-way, including swales, to Polk County. Lake Foxwood's present surface elevation of 160.58 feet above mean sea level would remain virtually unchanged, during times of moderate rainfall, at 161 feet above mean sea level. Neither groundwater tables nor the soil's storage capacity would be perceptibly altered, even during periods when the lake was temporarily elevated by the control structure planned for it. The applicant has agreed to a design that would detain on his property a volume of water equal to one inch of rainfall over the whole of Basin III for five to seven days. At the western end of Foxwood Lake, a PVC overflow pipe with a diameter of six inches would be installed in a concrete outfall structure at an elevation of 161 feet above mean sea level. At 164.55 feet above mean sea level, a vertical V-notch in the weir would allow water to spill out of Foxwood Lake, if stormwater should raise the lake's surface to that elevation. Both the overflow pipe and the V-notch would empty through a pipe 36 inches across into an intermittent tributary to Blackwater Creek, which the parties stipulated to be Class III waters. The stream into which water leaving Foxwood Lake would flow meanders west to Martin Lake, about a mile away. James M. Pollock, Jr., owns property on the western edge of Martin Lake and farms land on the lake's edge. Mr. Forrest Sawyer of 1712 Gibsonia-Galloway Road owns land to the north of Mr. Rodgers' property. Mr. Sawyer's property is generally higher ground than the Rodgers property, although three or four acres of the Sawyer property lie in a low area into which drain water from the Rodgers property as well as water from elsewhere on the Sawyer property. No water drains onto the Sawyer property from Basin III, however. Charles C. Krug, his sister, and his brother together own 40 acres abutting the west side of the northwest 40 acres of the Rodgers property. A dike along the southern boundary of the Krug property prevents water entering from the south. No water has drained onto the Krug property from the Rodgers property in the last 45 years. Dorothy Thompson lives 300 or 400 feet east of Orange Avenue which is the eastern boundary of the Rodgers property. There is a small area east of Orange Avenue in Basin III which drains west through three culverts onto the Rodgers property. The Thompson home property evidently drains to the east; however, only since the widening of U.S. Highway 98, which runs north and south to the east of Mrs. Thompson's property have heavy rains resulted in flooding on her property. The applicant gave DER notice of the changes in stormwater discharge proposed for Basin III. Water discharged from the system the applicant proposes would meet the criteria for Class III waters, according to the uncontroverted evidence. Virtually all pollutants except colloidal solids should precipitate or be filtered out by the time water leaves Foxwood Lake for waters of the state. Respondent's witness' suggestion that the swales be paved to decrease the siltation overlooks the filtration and percolation grassy swales make possible. At one time DER required that developers design stormwater systems to detain, instead of a one-inch storm, the mean annual storm, for five to seven days. The applicant's system is designed to avoid any increase in the present rate of discharge under weather conditions up to and including a 100 year 24-hour storm.
Recommendation Upon consideration of the foregoing, it is RECOMMENDED: That DER grant Sam Rodgers' application for exemption from stormwater discharge licensure for Phase I of the proposed Foxwood Lake Estates. DONE AND ENTERED this 8th day of December, 1980, in Tallahassee, Florida. ROBERT T. BENTON, II Hearing Officer Division of Administrative Hearings Room 101, Collins Building Tallahassee, Florida 32301 Telephone: (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 9th day of December, 1980 COPIES FURNISHED: Andrew Reilly, Esquire Post Office Box 2039 Haines City, Florida 33844 Walter R. Mattson, Esquire 1240 East Lime Street Lakeland, Florida 33801 David Levin, Esquire 2600 Blair Stone Road Tallahassee, Florida 32301
Findings Of Fact Background Petitioner, David E. Musselman, is the owner of Lot 23, Block 22, Cudjoe Gardens Eighth Addition, Cudjoe Key, Monroe County, Florida. The lot measures 127 feet along its front and rear property line, 135 feet along its side property lines and, similar to adjacent lots, its rear property line abuts an artificially created waterway. Currently, most of petitioner's lot enjoys an elevation of six feet; however, from the edge of the waterway landward a distance of approximately 20 feet [to what has been referred to as the "toe of the existing slope" in these proceedings] the surface consists of exposed caprock at an elevation of approximately four inches above mean high water. It is petitioner's desire to construct a single family residence upon such lot and, incident to such construction, to erect a seawall along the edge of the waterway such that the elevation at the waterway will be increased by two feet, and to backfill from the seawall to his home. Such backfilling would require the deposition of approximately 3,540 square feet of fill within the Department's jurisdiction, which was shown to extend from the edge of the waterway to the toe of the existing slope, and would raise the elevation in such area two feet above existing grade. On December 16, 1991, petitioner filed an application with respondent, Department of Environmental Regulation (Department), for an exemption from the Department's wetland permitting requirements. If approved, such exemption would allow petitioner to construct the vertical seawall along the waterway, and backfill from the seawall to his proposed home. By notice of agency action dated February 14, 1992, the Department proposed to deny petitioner's application predicated on its conclusion that his proposal did not meet the exemption criteria established by Rule 17- 312.050(1)(g), Florida Administrative Code. Petitioner filed a timely protest to contest the Department's conclusion. The exemption Pertinent to this case, Rule 17-312.050(1)(g), Florida Administrative Code, exempts from permitting the following activities: (g) Construction of seawalls or riprap, including only that backfilling needed to level the land behind the seawalls or riprap, in artificially created waterways where such construction will not violate existing water quality standards, impede navigation or adversely affect flood control. An artificially created waterway shall be defined as a body of water that has been totally dredged or excavated and which does not overlap natural surface waters of the state. For the purpose of this exemption, artificially created waterways shall also include existing residential canal systems . . . . At hearing, the parties stipulated that the waterway which abuts the rear property line of petitioner's lot is an artificially created waterway, as well as an existing residential canal, and that the proposed project will not violate existing water quality standards, impede navigation, or adversely affect flood control. Notwithstanding, the Department contends that petitioner's application should be denied because no need has been demonstrated that would support the construction of the seawall along the edge of the waterway, as opposed to locating it further inland, and therefore the amount of backfill, with its attendant loss of wetlands, is excessive. For the reasons set forth in the conclusions of law, the Department's position is untenable as a matter of law. 1/
Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that the Department enter a final order approving petitioner's application for an exemption to construct a seawall, and to backfill from such seawall to his proposed home, as applied for. DONE AND ENTERED in Tallahassee, Leon County, Florida, this 4th day of June 1992. WILLIAM J. KENDRICK Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 4th day of June 1992.
The Issue The issues are whether Keith Rockman's construction of a dock and other structures on Choctawhatchee Bay in Fort Walton Beach, Florida, is exempt from Wetland Resource Permit requirements, and whether authorization to use sovereign submerged lands for the project should be given.
Findings Of Fact Based on the evidence presented by the parties, the following findings of fact are made: On December 19, 2005, Mr. Rockman, who lives at 325 Brooks Street, Southeast, Fort Walton Beach, Florida, filed an application with the Department's Northwest District Office in Pensacola requesting authorization to construct a platform seven feet wide by eight feet long; an access pier three feet long; another access pier four feet wide by forty-five feet long; four mooring pilings outside the slip; and ten mooring pilings inside the proposed slip, totaling 371 square feet. The application indicated that the proposed construction activities would take place in the Choctawhatchee Bay, a Class III water of the State, on which Mr. Rockman's property fronts. (This waterbody is more commonly known as the Santa Rosa Sound or the Intracoastal Waterway.) The property already had an existing 25-foot dock when Mr. Rockman purchased the property sometime in 2005; however, because Mr. Rockman wishes to dock a larger boat than the prior owner, he has requested authorization to build the structures in issue here. Based upon the information supplied by the applicant, Diana Athnos, an Environmental Manager with the Northwest District Office, advised Mr. Rockman by letter dated January 31, 2006, that the Department had "determined that [his] project is exempted from [the Department's] Wetland Resource Permit requirements by Rule 62-312.050(1)(d), Florida Administrative Code." The letter also stated that the "letter is your authorization to use sovereign submerged land (if applicable) for the construction of your project, as required by Chapter 253.77, Florida Statutes and Chapter 18-21, F.A.C." After Department approval was obtained, Mr. Rockman completed construction of the project. Mr. Rockman elected not to publish notice of the Department's decision or provide notice by certified mail to specific individuals. Therefore, third parties were not barred from challenging the Department's decision until after they received actual notice. Petitioner, who lives next door to Mr. Rockman, learned about the Department's decision in a telephone call with the Northwest District Office on March 8, 2006. The papers filed in this case indicate that Petitioner and other neighbors had actually observed construction activities on Mr. Rockman's property in November 2005 and had filed complaints with the Department regarding these unauthorized activities. These complaints evidently led to the filing of an application by Mr. Rockman. On March 17, 2006, Petitioner, who resides at 328 Brooks Street, Southeast, Fort Walton Beach, and has 50 feet of frontage on the water with a dock extending into those waters, filed a letter with the Department, which was treated as a Petition challenging the Department's earlier decision. This Petition was later dismissed by the Department on the ground it raised claims concerning Petitioner's riparian rights, a matter beyond the Department's jurisdiction. Petitioner then filed an Amended Petition on July 11, 2006, in which he again contended that his riparian rights would be severely restricted by the proposed activities, and that the dock would create a navigational hazard. Although Florida Administrative Code Rule 62-312.050(1)(d)3. requires that a project not "create a navigational hazard" in order to be exempt from permitting requirements, Petitioner opted to base his claims on two provisions in Florida Administrative Code Rule 18-21.004(7), which contains the general conditions for authorizations to use sovereign submerged lands. The riparian rights issue was again excluded from consideration at a status conference held on January 5, 2007. The parties advise that this issue is now being pursued in a separate action in circuit court. Through the introduction into evidence of its complete permit file as Department Composite Exhibit 1, the Department established that the proposed activities are exempt from permitting requirements under Florida Administrative Code Rule 62-312.050(1)(d). More specifically, the activity will take place in waters which are not located in Outstanding Florida Waters; the structures are less than 1,000 square feet of surface area over the landward extent of waters of the State; they will be used for recreational purposes; they will be constructed on pilings; they will not substantially impede the flow of water or create a navigational hazard; and the structure is the sole dock constructed pursuant to the exemption as measured along the shoreline for a minimum distance of 65 feet. The dock and associated structures and pilings will be constructed over sovereign submerged lands owned by the State of Florida. Under Florida Administrative Code Rule 18-21.005(1), which specifies the forms of authorization for consent to use sovereign submerged lands, "no application or written authorization is required for an activity that is exempt from the requirements of obtaining a permit," so long as certain conditions are met, including those found in Florida Administrative Code Rules 18-21.004(7). See Fla. Admin. Code R. 18-21.005(1)(b). The only relevant condition raised in the Amended Petition is whether or not the "[s]tructures or activities shall . . . create a navigational hazard." Fla. Admin. Code R. 18-21.004(7)(g). In construing this rule, and the similar requirement in Florida Administrative Code Rule 62- 312.050(1)(d)3., the Department considers whether the structures will create a navigational hazard for boaters on the Intracoastal Waterway, as well as the owners of property who reside on either side of Mr. Rockman. In his Amended Petition, Mr. Woolshlager contended that the proposed structures or activities will create a navigational hazard when he accesses the dock in front of his property. As clarified at hearing, Petitioner does not dispute that he (or any "good boat driver") has adequate ingress and egress for his smaller boat, even with the larger dock on Mr. Rockman's property. Indeed, the record shows that he has been observed leaving his dock and accessing the Intracoastal Waterway. However, Petitioner indicated that if he should die, his wife intends to sell the property. If the new purchaser desires to dock a larger boat, he fears that there will not be sufficient room to do so, and the value of his property will be diminished. Through testimony from a licensed boat captain, it was established that Mr. Rockman's dock does not create a navigational hazard for boaters in the Intracoastal Waterway whose boat channel lies at least 600 feet or so from the shoreline, or for property owners on either side of the applicant's property. Although Petitioner cannot dock a larger boat than he now has (a 21-foot boat), this is because he needs to dredge out the area where his existing dock is built and reconfigure its shape. (Mr. Woolshlager agreed that his dock actually encroaches a few feet onto Mr. Rockman's property; however, Mr. Woolshlager advises that the prior owner (who sold the property to Mr. Rockman) agreed to this encroachment when he purchased the property.) Therefore, all criteria have been satisfied.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Environmental Protection enter a final order granting Mr. Rockman's application for an exemption from permitting requirements and authorization to use state-owned submerged lands. DONE AND ENTERED this 7th day of May, 2007, in Tallahassee, Leon County, Florida. S DONALD R. ALEXANDER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 7th day of May, 2007. COPIES FURNISHED: Lea Crandall, Agency Clerk Department of Environmental Protection 3900 Commonwealth Boulevard Mail Station 35 Tallahassee, Florida 32399-3000 John N. C. Ledbetter, Esquire 4641 Gulfstarr Drive Suite 102 Destin, Florida 32541-5324 Nona R. Schaffner, Esquire Amanda G. Bush, Esquire Department of Environmental Protection 3900 Commonwealth Boulevard Mail Station 35 Tallahassee, Florida 32399-3000 Michael William Mead, Esquire John S. Mead, Esquire Michael Wm Mead, P.A. Post Office Drawer 1329 Fort Walton Beach, Florida 32549-1329 Gregory M. Munson, General Counsel Department of Environmental Protection 3900 Commonwealth Boulevard Mail Station 35 Tallahassee, Florida 32399-3000 Michael W. Sole, Secretary Department of Environmental Protection 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000
Findings Of Fact In 1950, Petitioner acquired lots 8 and 9, block 23, of Lone Palm Beach subdivision, third addition, which lots front on Boca Ciega Bay in Pinellas County, and she has held the property in free simple since. Petitioner's late husband, her predecessor in title, acquired the lots in 1941. They constitute the tip of man-made peninsula jutting bayward from a barrier island bordered on the other side by the Gulf of Mexico. In 1926, the lots did not exist as such, because the peninsula had not yet been built. Petitioner's exhibit No. 10. Since the creation of the lots, their aquatic periphery has varied continually, on account of accretion and reliction. In the first half of the last decade, wooden and metal stakes were sunk along the shoreline, landward of the water's edge. Since then, water has washed away Petitioner's beach, moving the shoreline inland an average distance of approximately thirty feet. Erosion has been more severe along the northern half of Petitioner's beach than along the southern half. Seawalls have been built along adjacent properties on either side of Petitioner's parcel. The evidence did not establish what proportion of this erosion may have been attributable to the effects of Hurricane Agnes or to the location of neighboring seawalls or to any other particular cause. In 1972, the Honorable C. Richard Leavengood, Petitioner's present husband, hired Rupert Osteen, a contractor, to build a seawall. Pinellas County issued a building permit to Mr. Osteen, covering a "Seawall - 356LF - Type D," Petitioner's Exhibit No. 5, on March 14, 1973. (In September of 1951, the Town of Redington Beach had issued a building permit for "Dredging and Filling behind Sea Wall Constructed on [what is now Petitioner's] Rear Property Line.") Construction began, but came to an abrupt halt in July of 1973, when Mr. Osteen was arrested for building a seawall "without having obtained the recommendation of the Chief of Engineers and the Authorization of the Secretary of the Army prior to beginning," a criminal offense of which he was subsequently convicted in the United States District Court for the Middle District of Florida. Respondent's Exhibit No. 4. Before work on the seawall stopped, Petitioner had caused some 4,500 cubic yards of fill dirt to be deposited on the lots. After Mr. Osteen's arrest, Petitioner applied for a fill permit to the Pinellas County Commission, sitting as the Pinellas County Water and Navigation Control Authority. The Authority granted the permit on March 19, 1974, on condition that the seawall be made to tie in with the existing seawall on lot 7, which adjoins Petitioner's property to the west. On or about August 16, 1974, Petitioner applied to the Department of the Army prior to beginning," a criminal offense of which he was subsequently convicted in the United State District Court for the Middle District of Florida. Respondent's Exhibit No. 4. Before work on the seawall stopped, Petitioner had caused some 4,500 cubic yards of fill dirt to be deposited on the lots. After Mr. Osteen's arrest, Petitioner applied for a fill permit to the Pinellas County Commission, sitting as the Pinellas County Water and Navigation Control Authority. The Authority granted the permit on March 19,1974, on condition that the seawall be made to tie in with the existing seawall on lot 7, which adjoins Petitioner's property to the west. On or about August 16, 1974, Petitioner applied to the Department of the Army for a permit, pursuant to Sections 403 and 1344 of Title 33, United States Code. Petitioner applied for the "after the fact" permit at issue in these proceedings on May 10, 1974. At one point in the course of negotiations between Petitioner and Respondent, Mr. Douglas Jones, Chief of Respondent's Bureau of Permitting, indicated that Respondent would permit Petitioner to erect another seawall along the present mean high water line. Eventually, Respondent's staff notified Petitioner that it would recommended denial of an after the fact permit for the existing seawall, and Petitioner filed a request for administrative hearing, which initiated these proceedings. Aerial photographs dating back to 1942 were received in evidence. Respondent's Exhibits Nos. 5 through 11. None of these phontographs show land as far out in the water as the portion of the seawall Mr. Osteen finished. The partially completed seawall is further waterward tan the 1971 interface between land and water. Respondent's Exhibits Nos. 9 and 10. In November of 1973, Alan J. Burdette, Jr., a marine biologist, who is now employed by Respondent, inspected lots 8 and 9 of Lone Palm Beach subdivision and found water in the low area landward of the seawall. More recent photographs indicate that the seawall still stands somewhat offshore. E.g.., Respondent's Exhibit No. 16, taken on September 7, 1977. Mr. Bardette's inspection revealed oyster and fiddler crabs inside the seawall and clams just outside. Mangroves, which were not there at the time construction began, had sprung up. Removal of the seawall would create additional shallow bottom where algae, clams, oysters, mangroves and other marine life could flourish. Mr. R. S. Murali, a hydorgraphic engineer employed by Respondent, visited Petitioner's property the day before the hearing in this matter was held. While he was on the site, the wind blew from the southwest and waves with an average height between eight and nine inches struck Petitioner's unfinished seawall every 1.2 seconds. Mr. Murali discovered evidence of erosion under the seawall, which was caused by wave action. If the seawall were placed more landward, so that waves travelled up a sloping beach before striking it, the erosion problem could be significantly alleviated.
Recommendation Upon consideration of the foregoing, it is RECOMMENDED: That Petitioner's application for an after the fact fill permit authorizing the seawall which has already been constructed around lots 8 and 9, block 23, of Lone Palm Beach Subdivision, third addition, be denied. DONE and ENTERED this 30th day of November, 1977, in Tallahassee, Florida. ROBERT T. BENTON, II Hearing Officer Division of Administrative Hearings Room 530, Carlton Building Tallahassee, Florida 32304 904/488-9675 APPENDIX Paragraph one of Petitioner's Proposed Findings of Fact has been adopted, in substance, insofar as relevant:. Paragraph two of Petitioner's Proposed Findings of Fact has been adopted, in substance, insofar as relevant, except for the date of the permit issued by the Pinellas County Water and Navigation Control Authority, which is immaterial. Paragraph three of Petitioner's Proposed Findings of Fact is apparently predicated on Petitioner's Exhibit No. 12, an uncertified copy of page 74 of Pinellas County's Plat Book 20. Although a handwritten notation on the exhibit reads "Plat Recorded June 21, 1937" such extraneous handwriting on an uncertified copy is not "evidence of a type commonly relied upon by reasonably prudent persons in the conduct of their affairs.". Section 120.58(1)(a), Florida Statutes (1975). The question of the Butler Act's applicability is a question of law rather than of fact and it has not been necessary to decide the question. Paragraph four of Petitioner's Proposed Findings of Fact has not been adopted, for the most part, because of lack of support in the evidence. Paragraph five of Petitioner's Proposed Findings of fact emphasizes that the testimony as to flora and fauna related to a time considerably after application for the after the fact permit was made. While this is true, what is at issue is the ecological consequences of leaving the seawall, so that the relevant time period is the time period beginning when the application was made and extending indefinitely into the future. COPIES FURNISHED: Ms. Carol Haughey, Esq. Department of Environmental Regulation 2562 Executive Center Circle, East Montgomery Building Tallahassee, Florida 32301 Mr. Ross H. Stanton, Jr., Esq. 280 Florida Federal Building 26274th Street North St. Petersburg, Florida 33704 Ms. Patricia M. Duryee, Esq. Department of Environmental Regulation 2562 Executive Center Circle, East Montgomery Building Tallahassee, Florida 32301 ================================================================= AGENCY FINAL ORDER ================================================================= BEFORE THE STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL REGULATION DOROTHY B. LEAVENGOOD, Petitioner, vs. CASE NOS. 77-484 STATE OF FLORIDA, DEPARTMENT OF ENVIRONMENTAL REGULATION, Respondents. /
The Issue Whether Petitioner's application for an environmental resource permit to remove two canal plugs in the Cahill canal system should be granted or denied.
Findings Of Fact The proposed project On March 19, 1998, Petitioner Cahill submitted a permit application to the Department to remove two canal plugs in the Cahill Pines and Palms subdivision on Big Pine key. A backhoe would be used to dredge and lower the plugs to a depth of minus five feet mean low water (-5 ft. MLW) for the purpose of providing boating access to the properties now isolated from open water. The Cahill canal system is located within class III waters of the state which open into Pine Channel, a natural waterbody designated as Outstanding Florida Waters (OFW). In 1991 and 1995 Petitioner Cahill submitted permit applications to the Department to remove the same two canal plugs. Those applications were initially denied and the denials were litigated in formal administrative hearings. Those hearings resulted in Department final orders denying both applications.3 Background4 In July, 1991, the Department received a permit application requesting the removal of two canal plugs down to a depth of minus five-and-a-half feet NGVD. A formal administrative hearing was conducted on March 3 and 4, 1994, in Key West, Florida, before Stuart M. Lerner, a duly designated Hearing Officer (now Administrative Law Judge) of the Division of Administrative Hearings. That initial permit application denial was based upon water quality considerations and the project's failure to meet the public interest test. On May 17, 1995, Petitioner submitted a permit application to the Department which was denied. The basis for the permit denial was that the project was substantially similar to the previously litigated project. On April 23, 1996, a second formal administrative hearing was held in Key West, Florida, before Administrative Law Judge Susan B. Kirkland. Judge Kirkland found that the 1995 permit application did not address the issues raised by the Department in the first administrative hearing. Judge Kirkland also concluded that the 1995 application should be denied on the basis of res judicata. The Department entered a Final Order on September 12, 1996, concluding that the doctrine of res judicata applied to support the denial of Petitioner's 1995 application. New facts/changed conditions In all material aspects, the proposed dredging activity in the current permit application is identical to the previously proposed dredging activity. Petitioner Cahill seeks to lower the two canal plugs to allow boat access. The documents submitted in support of the current application do not propose any significant changes to what was proposed in the two prior applications. Petitioner Cahill provided copies of provisions of the Monroe County Comprehensive Plan, the Florida Keys National Marine Sanctuary Management Plan and two Monroe County Ordinances, in support of the current permit application. This information does not constitute new facts or changed conditions sufficient to characterize the proposed project as substantially different from the previously denied applications. Petitioner Cahill provided a list of "enhancements" in the current permit application seeking to provide reasonable assurance for issuance of an environmental resource permit. These proposed "enhancements" are not binding on the Petitioner Cahill's members and do not constitute such new facts or changed conditions as to make the project substantially different from the previously denied applications. The differences between the current application and the two previously denied applications are primarily cosmetic differences. The substance of the matter is unchanged in any material detail.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that a final order be issued in this case denying Petitioner's pending application for an environmental resource permit. DONE AND ENTERED this 15th day of March, 1999, in Tallahassee, Leon County, Florida. MICHAEL M. PARRISH Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 15th day of March, 1998.
Findings Of Fact On or about March 7, 1986, Petitioner submitted an application for a variance from the open space and rear set-back line requirements applicable to property located at 2612 U.S. 19 North, Clearwater, Florida. The subject property is zoned CC (commercial center). Petitioner's application requests a variance to provide 12.33% open space instead of 25%, and to construct a building 30 feet from the rear property line rather than 50 feet as required by the Land Development Code for property zoned CC. On or about April 24, 1986, the Development Code Adjustment Board denied Petitioner's application for a variance, and Petitioner timely appealed on May 6, 1986. The only evidence in support of its application offered by Petitioner was the testimony of Robby Tompkins. He testified that Petitioner's application is "unique" because Petitioner was 90% complete with its architectural plans for the renovation and modernization of the subject property when the current ordinance took effect, and Petitioner therefore urges that the current ordinance should not apply. Additionally, Petitioner argues that there will be no injury to the public as a result of the variance, and in fact the project will add 6800 square feet to its shopping center. Tompkins admitted that an increase in financial return was the primary reason Petitioner has sought the variance. Finally, he stated that if Petitioner complies with the 25% open space requirement, there will not be enough parking to meet Code provisions, and if sufficient parking is provided, there will not 25% open space.