Elawyers Elawyers
Washington| Change
Find Similar Cases by Filters
You can browse Case Laws by Courts, or by your need.
Find 49 similar cases
EDMOND BLOUNT, JR.; EDMOND BLOUNT, SR.; ROBERT DAVENPORT; AND GERARD MURNAN vs CITY OF MEXICO BEACH AND DEPARTMENT OF ENVIRONMENTAL PROTECTION, 98-002006 (1998)
Division of Administrative Hearings, Florida Filed:Mexico Beach, Florida Apr. 30, 1998 Number: 98-002006 Latest Update: Dec. 24, 1998

The Issue Is the City of Mexico Beach (the City or Applicant) entitled to the issuance of a joint coastal permit and consent to use of sovereign submerged land for the Mexico Beach Canal (Main Canal) and a municipal flushing outlet adjacent to 8th Street (8th Street outlet)? Those permits would be issued by the Department of Environmental Protection (DEP) in response to DEP Application File No.: 0124938-001JC and DEP Application File No.: 0129039- 001JC, respectively.

Findings Of Fact Petitioners Edmond Blount, Sr.; Edmond Blount, Jr.; and Robert Davenport are residents of the City of Mexico Beach, Florida. As residents they have access to the Main Canal, the public beaches adjacent to the Main Canal, and beaches adjacent to the 8th Street outlet. Edmond Blount, Jr., and Robert Davenport oppose the issuance of any permits by DEP which would allow the City to conduct dredging and the placement of dredge materials associated with the Main Canal. Those Petitioners and Edmond Blount, Sr., oppose the grant of necessary permits by DEP upon the application by the City to conduct occasional maintenance excavation at the 8th Street outlet to alleviate potential damage through erosion to properties adjacent to the 8th Street outlet. The City of Mexico Beach is a municipality in Florida which serves as the local government for that community. The City owns the Main Canal and 8th Street outlet. DEP is an environmental regulator with authority to issue or deny joint coastal permits and to grant or deny consent to use sovereign submerged lands belonging to the State of Florida. The joint coastal permitting authority and right to grant consent to use is pursuant to Chapters 161, 253, and 373, Florida Statutes, and Chapters 18-21 and 62B-49, Florida Administrative Code. In particular, DEP has joint coastal permitting authority upon sovereignty lands in the State of Florida below the mean high waterline (MHWL) of any tidal water of the State. The reference to sovereign land is an association with lands below MHWL held in trust by the State of Florida. The term tidal waters refers to waters in which there is an astronomical effect on the elevation of that water. The Gulf of Mexico which fronts the City is a tidal water of the State of Florida. The MHWL is established along the coastal regions in Florida, to include the Gulf coast that fronts the City. The MHWL is set based upon charting information concerning the local mean high tide, the average height of the high waters, and where this average intersects the land. PERMIT APPLICATION FOR MAIN CANAL On June 30, 1997, the City applied to DEP for a ten-year permit/water quality certification and authorization to use sovereign submerged lands owned by the Board of Trustees of the Internal Improvement Trust Fund (the Trustees), which would allow the City to maintenance dredge the Main Canal entrance and place the dredge material on the beach east of the canal below the water's edge. This task would be accomplished by the use of hydraulic dredging device. In the course of these activities, approximately 660 cubic yards of material would be removed approximately four times a week. The application file number for the requested permit in the Main Canal project was: 0124938-001 JC. The City, through its application, provided a complete and appropriate application with adequate engineering data to support the proposed project. The Main Canal is located in the western part of the City and is partially located in sovereign submerged lands of the State of Florida where the canal intersects the Gulf of Mexico below the MHWL. On January 13, 1998, DEP gave notice of its intent to issue necessary permits for the activities to allow dredging and the placement of fill in association with the Main Canal. More specifically, the hydraulic dredge the City intends to use in the maintenance dredging of the Main Canal is a floating device which excavates the sand from the bottom of the entrance of the Main Canal and pipes the material onto the beach immediately east of the dredge site. The dredging activities may only be conducted in a manner designed to protect the beach-dune system, water quality and habitat for marine turtles. These restrictions in the conduct of the dredging are in accordance with the proposed joint coastal permit. The dredging activity is to remove and deposit clean beach sand that has been transported by coastal processes and deposited in the lee of the jetty within the Main Canal. There is no intent, nor permission under the proposed permit, that would allow disturbance of any sediments more landward of the extent of the canal. The dredging is necessitated because the entrance of the Main Canal slowly fills with sand being transported from west to east along the shoreline. The Main Canal is stabilized on both sides by jetties. The western-most jetty extends further out than the eastern-most jetty. The Main Canal has seawalls along its inside. A recreational area is located on the western side of the Main Canal. The Main Canal is highly utilized for purposes of commerce and recreation. The Main Canal constitutes an economic support for many residents of the City. The Main Canal in proximity to the Gulf and the Gulf itself are not considered outstanding Florida waters or aquatic preserves. The waters in the Main Canal and Gulf are Class III marine waters when considering the parameters for water quality under DEP statutes and rules. Competent evidence was presented concerning water quality sampling and results in the analysis of those samples for fecal coliform bacteria and total coliform bacteria in relation to the Main Canal at its entrance where dredging would take place under the terms of the permit. Some values for fecal coliform and total coliform exceeded the allowable limits for those parameters as envisioned by Section 62-302.530, Florida Administrative Code, as preexisting conditions. However, the dredge operations will not lead to further degradation of the existing Class III marine waters in the Main Canal and degradation of the Gulf. The relatively clean sand being excavated does not contain fines or organics, which, through the dredging and placement of the sand on the beach following the dredging, would contribute to degradation of water quality standards. The activity associated with the dredging and placement of those materials on the beach will not cause a significant adverse impact to the beach-dune system, nor will the transport of sand from west to east along the beach as it presently exists be interrupted by the dredging and placement of the sand. The dredged material is being placed immediately east of the dredge operation avoiding a disruption of the natural processes of transport. The proposed disposal area is located on the beach at least 100 feet east of the canal below the waters edge at approximately minus 0.5NGVD. Finally, the deposit of the sand on the beach contributes to beach stabilization as opposed to depriving the beach of sand. The proposed permit requires that the dredge pipeline be retracted upon a daily basis during marine turtle nesting season from May 1 until October 31 each year. By this limitation in the operation of the dredge pipeline, marine turtles are not hindered in their behavior nor is their habitat unduly disturbed. The placement of the dredged sand on the beach would not be in the dry upland where the turtles would typically nest. The DEP Bureau of Protected Species Management reviewed the permit application for any significant adverse impact on nesting sea turtles and recommends the approval subject to specific conditions such as have been described. The dredging of the sand from the Main Canal and placement of that material on the beach will not cause significant adverse impact to the property of others. The Main Canal project will not create any significant erosion or turbidity. Given the small volume and coarseness of the dredged sand, elevated turbidity levels are not expected. The dredging of material from the mouth of the Main Canal and placement on the adjacent beach does not block lateral access to the beach, because the hydraulic dredge pipeline is placed at the water's edge with a discharge of dredge material being made at the water's edge in the area of the intertidal zone where water comes up to the beach. The exact discharge point is seaward of the area described as the intertidal zone. Given that the project associated with the Main Canal is located in Class III marine waters, it must not be contrary to the public interest. The project is not contrary to the public interest. PERMIT APPLICATION FOR 8TH STREET OUTLET On June 13, 1997, the City applied to DEP for a ten- year permit/water quality certification and authorization to use sovereign submerged lands owned by the Board of Trustees. This would allow the City to conduct occasional excavation of the 8th Street municipal flushing outlet which connects to the Gulf, having in mind the alleviation of potential damage to adjacent beachfront properties. That potential damage would be expected to occur in the instance where there was an uncontrolled breach of the berm surrounding the 8th Street outlet due to high incidence of rainfall, thus eroding adjacent beachfront properties. With the advent of scheduled maintenance, excavation of the outlet that erosion is expected to be deterred. The application file number for the requested permit in the 8th Street outlet project was File No.: 0129039-001 JC. The City, in its application for necessary permits to conduct excavation at the 8th Street outlet, submitted a complete and appropriate application setting forth adequate engineering details. More specifically, the permit application contemplates the removal of approximately 20 to 40 yards of beach sand per excavation, with the material excavated being placed on the beach near the water's edge. The excavation would be approximately 4 to 5 feet wide, 50 feet long, and 2 to 3 feet deep. Ordinarily, the frequency of excavation would be one to two times per month. The excavation practices would be by the use of a backhoe other than in the sea turtle nesting season. While sea turtles are nesting, the plans contemplate excavation by hand by use of a shovel or similar tool. In addition, during the turtle nesting season the application contemplates that the excavation would be done during daylight hours, only twice a month, to reduce potential flooding of marine turtle nests due to a meandering outflow from the outlet. Other than in the marine turtle nesting season the excavation would be done on an "as needed" basis. On March 16, 1998, the DEP gave notice of its intent to issue a permit for the dredging at the 8th Street outlet. The conditions associated with the intended permit for dredging of the 8th Street outlet deter any significant adverse impacts to the beach-dune system. In the area of the 8th Street outlet, a large box culvert runs underneath U.S. 98, the main highway in the city. That highway runs parallel to the beach. Once the water flows through the culvert, it accumulates in the outlet south of the road. In the instance where rainfall is diminished, the flushing outlet does not flow to the Gulf and the beach berm, which accretes seaward of the outlet, traps the water that is being released via the culvert. By contrast, in instances where heavy rainfall occurs, the water in the outlet collects to a point that it begins to flow away from the culvert in the direction of the Gulf. If the beach berm has built up over time, the path of that flow in high incidence of rainfall can encroach on buildings that are adjacent to the culvert on the south side of U.S. 98. When the rainfall is sufficient, and the water begins to flow, it reaches a sufficient velocity to move sand as a bed load. Under those circumstances, when the water strikes a ridged object, like a house foundation, the local water velocity will act to carry away the sand more readily from that location where the house foundation is found, by scouring out the sand near the foundation, undermining the building and risking the collapse of the building onto the beach. In the course of this process the water breaches the beach berm and flows towards the Gulf. In the instance where the berm on the beach has been breached, the water that has been released begins to scour the beach and establish a pattern that can run down the beach roughly parallel to the Gulf for a distance before flowing into the Gulf. By contrast, the controlled release of water from the outlet would cause less of an impact, in that it would create an immediate access through the beach berm to the Gulf without creating the potential for harm to upland property or causing erosion or scouring of dunes and vegetation in beach areas, some of which might contain turtle nests. Unlike the circumstances with high incidence of rainfall where adjacent property is eroded and damaged, the use of controlled maintenance excavation to relieve the outlet would not cause significant and adverse impact to adjacent property owners. The controlled release of the water in the outlet, unlike the natural release of that water in high incidence of rainfall, is more in the interest of the public when considering adverse impacts to property. The introduction of the water in the outlet, and its constituents, onto the beach and its consequences, is no more a problem whether based upon the natural event of high incidence of rainfall or the routine release contemplated by the project. Therefore, the alternative method of releasing the water by use of scheduled excavation is not contrary to the public interest. If anything, the use of periodic excavation to relieve the outlet would limit the breadth of discharge and the amount of discharge. The 8th Street outlet and the Gulf area adjacent to that outlet are not within outstanding Florida waters or aquatic preserves. The project site for the 8th Street outlet and the Gulf are within Class III marine waters. The existing Class III marine water quality parameters for fecal coliform and total coliform when considered in accordance with Rule 62-302.530, Florida Administrative Code, have been exceeded in the 8th Street outlet. This is borne out by test results from samples gathered at the 8th Street outlet presented at hearing. However, as with the circumstance with the Main Canal, the effect of periodic excavation to relieve the outlet will not further degrade state waters found in the outlet. The results of water quality tests performed following sampling that relate to the amount of fecal coliform and total coliform in the Gulf that could be expected at the entrance of the Main Canal and as the discharge of water within the 8th Street outlet enters the Gulf show low values for those parameters. Therefore, it is not anticipated that the release of the water from the 8th Street outlet to the Gulf under controlled conditions contemplated by the permit application would cause a violation of the parameters for fecal coliform and total coliform in the Gulf, the receiving body of water, especially when compared to the existing release of water from the 8th Street outlet to the Gulf in high incidence of rainfall. This finding is also influenced by the fact that the most excessive values for total coliform and fecal coliform in the 8th Street outlet system were found 600 to 800 feet up the water course described as the 8th Street outlet. Similar to the Main Canal, the project contemplated at the 8th Street outlet would not require mitigation before being permitted by DEP. The 8th Street outlet project would not create significant adverse impacts on coastal sediment transport. The DEP Bureau of Protective Species Management reviewed the 8th Street outlet application and recommended approval with specific conditions. Those conditions offer adequate protection to marine turtles and their habitat. The conditions include project excavation that does not create parallel trenches in the sand that inhibit movement on the beach by sea turtles. The 8th Street outlet project will not create significant erosion concerns or turbidity concerns. The 8th Street outlet project does not block lateral beach access to the public, in that the excavation to relieve the outlet on a periodic basis is temporary, that is to say only in effect when the water is being released from the outlet to the Gulf. CONSENT TO USE SOVEREIGN SUBMERGED LANDS The 8th Street outlet project, as well as the Main Canal project, involves sovereignty submerged lands below the MHWL constituted of the beach and ocean bottom. The facts show that the City is entitled to consent of use to work on sovereign submerged lands in the Main Canal and 8th Street outlet projects.

Recommendation Based upon the facts found and the conclusions of law reached, it is RECOMMENDED: That DEP issue a final order granting the City the joint coastal permits and consent to use sovereign submerged lands in accordance with application File Nos.: 0124938-001JC and 0129039-001JC respectively, subject to specific conditions contained therein. DONE AND ENTERED this 10th day of November, 1998, in Tallahassee, Leon County, Florida. CHARLES C. ADAMS Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 Filed with the Clerk of the Division of Administrative Hearings this 10th day of November, 1998. COPIES FURNISHED: Edmond Blount, Sr. Post Office Box 13855 Mexico Beach, Florida 32410 Edmond Blount, Jr. Post Office Box 13854 Mexico Beach, Florida 32410 Robert Davenport Post Office Box 13926 Mexico Beach, Florida 32410 Gerard Murnan Post Office Box 13378 Mexico Beach, Florida 32410 Paul G. Komarek, Esquire Daniel and Komarek, Chartered Post Office Box 2547 Panama City, Florida 32402 Ricardo Muratti, Esquire Department of Environmental Protection Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 John McInnis, City Manager City of Mexico Beach Post Office Box 13425 Mexico Beach, Florida 32410 Kathy Carter, Agency Clerk Department of Environmental Protection Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 F. Perry Odom, General Counsel Department of Environmental Protection Mail Station 35 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000

Florida Laws (4) 120.569120.57161.041373.414 Florida Administrative Code (8) 18-21.00418-21.005128-106.21662-302.53062-312.06562-312.08062B-41.00562B-41.0055
# 1
LARRY C. GIUNIPERO AND JAN D. GIUNIPERO vs. DEPARTMENT OF NATURAL RESOURCES, 85-000039 (1985)
Division of Administrative Hearings, Florida Number: 85-000039 Latest Update: Mar. 11, 1985

Findings Of Fact Petitioners, Larry C. and Jan D. Giunipero, reside at 2345 Tour Eiffel Drive, Tallahassee, Florida. On February 29, 1984, they obtained a building permit from Franklin County to construct a single-family dwelling on their lot in Alligator Point, Franklin County, Florida. The Giuniperos engaged the services of a professional engineer to design their beach house. In so doing, the engineer designed the structure so as to comply with the Federal Emergency Management Association (FEMA) guidelines, which are minimum building requirements established by the Federal Insurance Administration to qualify for federal flood insurance. These guidelines have been adopted by the Franklin County Planning and Zoning Department, and insure that the structure can withstand winds of 110 miles per hour. Even before the Guiniperos obtained their permit, respondent, Department of Natural Resources (DNR), was in the process of adopting new Rule 16B-26.14, Florida Administrative Code, which would establish a coastal construction line for Franklin County. Under the proposed rule, a coastal construction control line on Alligator Point would be established, and any excavation or construction activities thereafter on property seaward of the control line would require a permit from DNR, and have to be in conformity with all structural requirements set forth in Rule 168-33.07, Florida Administrative Code. Because the Guiniperos' lot lies on the seaward side of the control line, they were obviously affected by the rule. The rule adoption process was quite lengthy and well publicized. It began in October, 1983 when a public workshop was held in Apalachicola and aerial displays of the control line were placed in the courthouse. Further public hearings were held in Tallahassee in February, March and April, 1984. These hearings were the subject of numerous notices and advertisements in the Florida Administrative Weekly, Tallahassee Democrat, Apalachicola Times, Panama City News Herald, and Franklin County News. Clearly, the agency met all legal requirements in advertising the rule. However, for some reason, neither the Giuniperos or their professional engineer were aware of the pending rule change. Similarly, the Franklin County planner failed to advise them of the imminent rule change even though aerial displays of the proposed line were in the courthouse when the permit was issued. Rule 168-26.14, Florida Administrative Code, was adopted by the Florida Cabinet on April 5, 1984, and eventually became effective on April 30, 1984. As of that date, any construction or excavation work seaward of the control line required DNR to issue a permit unless a dwelling was already "under construction" in which case the project was grandfathered in. The parties agree that petitioners do not fall in this category since the dwelling was not "under construction" within the meaning of DNR rules. A few days before the rule became effective, a DNR engineer met with the Franklin County planner to review all building permits issued since September, 1983 for construction on the seaward side of the control line. The engineer did this so that he could inspect all building sites after the line became effective and determine which, if any, were "under construction" and therefore exempt from DNR permitting requirements. Because of the volume of permits issued to persons seeking to beat the April 30 deadline, and his unfamiliarity with alligator Point, the planner was unable to give the DNR engineer the precise location of petitioners' lot. On or about May 1, 1984, the engineer visited the general locale of petitioners' lot. There was no activity on petitioners' lot, and no permit posted on the site. Accordingly, he assumed a recently completed beach house some 300 feet east of petitioners' lot was actually the Giuniperos' house. Since it was already completed, he merely filed a report the following day indicating that "if the location referenced above is accurate, the structure appeared to be completed at that time." On July 6, 1984, petitioners proceeded to install twenty-three 8" by 8" pilings on their lot at a cost of $1,760. DNR discovered this construction activity a few days later and notified petitioners by telephone that such activity was illegal without a permit. A formal cease and desist order was sent on July 11, 1984, and no activity has taken place since that time. An application for a permit remains in abeyance pending the outcome of this proceeding. The structural requirements of DNR are more stringent than those previously required by Franklin County and FEMA. Indeed, the FEMA guidelines are not a part of a coastal construction regulatory program but are merely minimum standards to meet federal flood insurance criteria. Therefore, while the Guiniperos' proposed dwelling is designed to withstand a windload of 110 miles per hour DNR requires a structure to meet a windload of 140 miles per hour. DNR also recommends that larger and more expensive pilings be used, and that the structure be designed to adequately resist a 100 year return interval storm event. Because the DNR requirements are more stringent, petitioners estimate they will incur total costs of $8,890 just to pull out the old pilings and install larger ones. 1/ Additional costs may be incurred to redesign and build the structure to withstand a wind velocity of 140 miles per hour. By rule, DNR does not grant a waiver of its permit requirements except where a building is already constructed and an applicant desires to make "minor additions" to existing nonconforming structures. The Giuniperos do not qualify for such a waiver.

Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that petitioners' request for a waiver from the permitting requirements of Rule 16B-33.07 be DENIED. DONE and ORDERED this 11th day of March, 1985, in Tallahassee, Florida. Hearings Hearings DONALD R. ALEXANDER Hearing Officer Division of Administrative The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative this 11th day of March, 1985.

Florida Laws (2) 120.57120.68
# 2
IZAAK WALTON LEAGUE OF AMERICA, MANGROVE CHAPTER vs. ROBERT L. TURCHIN AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 78-002310 (1978)
Division of Administrative Hearings, Florida Number: 78-002310 Latest Update: Nov. 01, 1979

Findings Of Fact The proposed marina project involves the repair and renovation of a marina which has been in existence since the 1920s. The marina is located in Biscayne Bay within the City of Miami Beach, west of Purdy Avenue where it intersects with 13th Street. Currently, the marina is in a state of disrepair. In 1974, Respondent acquired ownership of the marina which was at that time an operating facility. Thereafter, Respondent began formulating plans to renovate and repair the facility. Respondent obtained estimates from construction firms to make repairs to the facility by replacing or reinforcing deteriorated members, piles, decking and other parts. Respondent plans to remove the existing wooden piers and piles consisting of 35,000 square feet of deck surface area and construct in their stead a facility consisting of only 24,560 square feet of deck surface area. The marina as renovated would not exceed its existing boundaries. In fact, the south pier of the marina will be relocated 40 feet northward of its existing location, which would place it 90 feet from the south property line. The proposed project entails construction of three main piers. The south pier is an L-shaped configuration which would extend westward 416 feet by 10 feet and then northward 304 feet by 10 feet. The north pier, also L-shaped, would extend westward 416 feet by 10 feet and then southward 202 feet by 10 feet. The center pier will have a T-shaped configuration. Its dimensions will extend westward 358 feet by 10 feet. The marina will also have a pier extending both northward and southward, 50 feet by 10 feet each from the center line of the pier. Additionally, the project will contain mooring piles along a canal which extends eastward from the northern perimeter of the marina. When completed, the marina will have accommodations for 161 vessels. The present facility, while it was a fully operating marina, accommodated 135 boats, together with over-the-water facilities constructed on a main center pier. Such facilities included a machine shop and major marina repair facilities, neither of which uses is proposed for the new facility. Construction activity for the proposed project involves no dredging or filling. In addition to reducing deck surface area to 24,560 square fete from the 35,000 square feet contained in the old facility, the proposed project also will contain 409 pilings as opposed to 1,037 in the existing facility. Existing wooden pilings will be removed and will be replaced with concrete pilings. Turbidity curtains will be used during the construction phase to reduce any adverse affect on water quality, which, in any event should be minimal. The concrete pilings will be installed by setting them in a steel template and driving them into the earth at the bay bottom with a hammer. In effect, this construction technique punches a hole straight down into the earth and results in minimal displacement of sediments at the bottom. Respondent also proposes to make certain cosmetic repairs to the sea wall at the present marina where there is some deterioration on the upper edges above the mean high water line resulting from corrosion. Such repairs will be made by welding of steel plate and putting a concrete cap over the top of the existing wall. The waters of Biscayne Bay are classified as Class III waters. There are no Class II waters in the vicinity of the proposed project. The testimony and evidence established that the area in and surrounding the marina facility is not productive in terms of benthic or faunal communities. There is virtually no marine vegetation in the area. The marina itself is almost devoid of any seagrasses, with the exception of several springs of Halophila and Caulerpa. The closest existing grass beds are located approximately 700 to 1,000 feet west of the marina's western perimeter. These grass beds, which include turtle grass and manatee grass, have apparently flourished during the period the existing marina was in full operation. Fouling organisms were found attached to pilings and the seawall areas of the marina. The waters inside the marina, and those in the surrounding area are not suitable as a habitat for breeding, nursery or feeding grounds for fish or other marine life. Studies conducted by Respondent's hydrographic expert indicate that tidal flow in the area of the marina will be enhanced by the renovation of the facility, largely due to reduction in the number of pilings, thereby reducing resistance to tidal flow. The evidence also disclosed that construction of the proposed facility will pose no navigational hazard or serious impediment to navigation in the immediate vicinity. The canal along the northern perimeter of the proposed project varies from 105 feet in width. Apparently only noncommercial boats will be docked in the marina and the canal. A marina has existed at the location of the proposed project for over 50 years, and there is no evidence that has ever created navigational problems within the canal or within the immediate area of Biscayne Bay. Petitioners suggest that the marina will "create a navigational hazard, or serious impediment to navigation..." within the meaning of DER's regulations, specifically Chapter 17-4.29(6)(b), Florida Administrative Code, under the theory that the boats to be accommodated in the facility will result in a general increase in boating traffic in north Biscayne Bay, and would, in addition, adversely affect the public's "navigation" of automobiles across numerous draw bridges whose spans will often be raised to accommodate boat traffic. It does not appear that chapters 253, 258.165 or 403, Florida Statutes, afford DER the authority to consider such factors in determining whether to issue a water quality permit. Even assuming that as a matter of law DER may consider such factors, the evidence presented by Petitioners on this point was vague and speculative. In its Proposed Order of Issuance, DER imposed seven permit conditions which, when combined with the design of the project and the facts set forth above, constitute "reasonable assurance" that the proposed project will not adversely affect water quality. These conditions include the following: Turbidity shall be monitored once daily during periods of water related construction activities at mid-depth 100 ft. upcurrent and 100 ft. down-current of the work area by a person(s) (project monitor) designed by the permittee. Adequate controls are taken during construction so turbidity levels beyond 100 ft. of the construction area in Biscayne Bay do not exceed 50 J.T.U. A pumpout station shall be installed and maintained for the removal of sewage and wastes from the vessels using this facility. No liveaboard vessels shall be docked at this facility unless said vessel has either a Coast Guard approved Marine Sanitation Device or a direct sewage pumpout connection is provided at the liveaboard slip. There shall be no positive drainage of stormwater runoff from the marina parking lot to Biscayne Bay. Fuel storage tanks shall be constructed of non-corrosive materials and located on the upland portion of the site. The fuel storage tanks shall be pressure tested at least once yearly to ensure that they are not leaking. Test reports shall be submitted to DER and the Dade County Environmental Resources Management. Floating oil booms and sorbent materials or equivalent equipment shall be available on site at all times in order to contain and clean up any oil or fuel spills. All marina employees shall be trained in the deployment and usage of the above spill cleanup equipment. The equipment above shall be subject to inspection by all regulatory agencies. At the conclusion of the hearing, it was stipulated among the parties that Petitioner, Izaak Walton League of America, Mangrove chapter, has standing to maintain this action pursuant to Section 120.57(1), Florida Statutes. With respect to Save Our Bay, the evidence disclosed that it is an unincorporated association which was formed for the purpose of preserving the waters of Biscayne Bay for safe navigational use, swimming and fishing, and to enhance the beauty of sunset Island and the venetian Isles, while at the same time protecting the area from the effects of pollution. Members of Save Our Bay own property in the vicinity of the proposed project, and use the waters in that area for swimming, boating and fishing. Their use of the natural resources of Biscayne Bay could be affected by construction of the proposed project. Walton, Save Our Bay and Respondent Turchin have submitted proposed findings of fact in this proceeding. To the extent that such findings of fact are not adopted in this Recommended Order, they have been specifically rejected as being either irrelevant to the issues in this cause, or as not having been supported by the evidence.

Florida Laws (4) 120.52120.57403.021403.088
# 5
SARAH E. BERGER vs WILLIAM KLINE AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 93-000264 (1993)
Division of Administrative Hearings, Florida Filed:Inverness, Florida Jan. 21, 1993 Number: 93-000264 Latest Update: Jan. 12, 1994

The Issue The issues to be resolved in this proceeding concern whether the applicant for the dredge and fill permit at issue has provided reasonable assurances that the project involved will comport with state water quality standards and public interest standards for purposes of Section 403.918(1)&(2), Florida Statutes. Specifically, it must be demonstrated that the applicant has provided reasonable assurances that the project is clearly in the public interest for purposes of Section 403.918(2), Florida Statutes, and related rules; whether Citrus County has standing to challenge the project; and whether the Department is required or authorized to enforce the provisions of the Citrus County Comprehensive Plan.

Findings Of Fact Kline filed an application for grant of a permit to construct a private boat dock with a roof, designed to cover a boat, in the Withlacoochee River. The Department has permitting jurisdiction, pursuant to Chapter 403, Florida Statutes, and related rules, inasmuch as the Withlacoochee River is a natural water body designed as Class III waters of the state, as well as an Outstanding Florida Water. The landward extent of the Department's jurisdiction is the wetland line depicted in Kline's exhibits 1 and 2 in evidence and in the testimony of Rose Poynor. The proposed installation consists of a private boat dock with boathouse or cover measuring 22 feet by 43 feet mounted on 12-inch diameter pilings. The boat cover roof would be approximately 14 feet above the surface of the Withlacoochee River at mean high tide. Portions of a presently- existing dock will be removed, leaving behind a walkway and terminal platform 6 feet wide and extending 6.5 feet from the wetland jurisdictional line out to the boat cover facility. The dock presently extends 6.5 feet from the wetlands jurisdictional line riverward. The existing dock shades the shoreline, including a non- jurisdictional area on the top of the bank. Kline proposes to remove a portion of this existing dock consisting of an area 10.75 feet by 12 feet on one side of the line and approximately 10.75 feet by 5 feet on the other side. This will include removing portions of the existing dock landward of the jurisdictional wetland line. The shoreline area that will be exposed upon removal of portions of the existing dock will be replanted with native plant species. The entire length of Kline's shoreline along the top of the existing bank will be cleared of nuisance species and planted with the required number of native plant species delineated in specific condition #18 of the intent to issue. More plants will be planted as necessary in order to maintain a 90 percent survival density of the required plants over a five-year period as specified in specific condition #21. Kline will also grant a perpetual conservation easement to the Department for the entire length of the shoreline extending a minimum of 4 feet waterward from the top of the bank. The conservation easement will insure protection of the planted shoreline and prevent any opportunity of shoreline hardening through construction of a seawall or other structures. The project will be constructed using best management practices for erosion control, including having the pilings driven from a barge over a period of three to five days so as to minimize the generation of turbidity. A floating turbidity curtain will also be used so as to surround the entire project area to prevent migration of turbidity off the site and which will not interfere with navigation. The total construction time is estimated to be three weeks. During construction, specific actions will be taken to avoid any impacts to manatees traveling the Withlacoochee River near the property. A turbidity curtain will not block manatee entry or exit from essential habitat and will be made of material in which manatees cannot become entangled or injured. Boats in the project area will operate at "no wake/idle speeds" at all times. Upon the sighting of a manatee, all construction activities will cease until the manatee has left the project area. Logs and details of manatee sightings will be maintained and reported to the Department's Marine Mammal Section. During construction, temporary signs will be installed and maintained; and after completion of the project, permanent signs and a permanent informational display will be located in areas specified by the Department's Marine Mammal Section. The specific actions to be taken to avoid impacts to Manatees during construction were developed by the Department's Marine Mammal Section and are imposed on the proposed project in specific condition #13 of the intent to issue as a condition upon a grant of the permit, and Kline has agreed to these conditions. Kline's property is located on the Withlacoochee River in Inglis, Levy County, Florida. The proposed project extends waterward of Kline's shoreline and the waterward portion of the project is located within the boundaries of Citrus County. Kline's property is approximately 7 to 8 miles from Yankeetown, which is downstream on the Withlacoochee River from Inglis. Yankeetown is located on the lower reaches of the Withlacoochee River near the point where it enters the Gulf of Mexico. The U.S. 19 Highway bridge is 900 to 1,000 feet upstream of the Kline property. Kline's shoreline is relatively steep with areas of exposed limestone. Vegetation along that shore consists of red maple, laurel oak, and other identifiable wetland species. Water depth drops off relatively quickly varying from 6 to 10 feet at the edge of the existing dock. The river is approximately 121.5 feet wide at the project site. The project's construction will extend approximately 21.7 percent of the width of the river at the project site after completion. On the opposite shore from the Kline property and project site, there is also a boat dock with a small boat basin which was dredged landward into the river bank at some time in the past. On the opposite shoreline, a fallen log projects into the river which does impede navigation to some extent on that side of the river but it is an easily removable obstruction. The log presently remains just below the water surface at high tide. The Cross Florida Barge Canal and spillway are located approximately 2 miles upstream from the Kline property and eastward from the U.S. 19 bridge. An island exists in the river around a bend downstream from the Kline property. The island prevents the passage of boats larger than 16-foot beam around the island and upriver toward the Kline property. The Withlacoochee River is a slow-moving, tannic-acid tinged river and historically was extensively shaded by a tree canopy. In the last half century or so, many of the trees have been removed to accommodate shoreline development which is characterized primarily by vacation homes, weekend retreats, and retirement homes with attendant docks, boathouses, seawalls, and similar private river and boat access facilities serving residential owners. The docks and boathouses existing in the river occur on both sides of the river from the Gulf of Mexico up at least as far as the U.S. 19 bridge. The historical character of the river has thus changed in the last several decades such that extensive numbers of docks, seawalls, boathouses and residences presently characterize the river margin. Water Quality Impacts The water quality impacts of this project will be minimal. The dock and boathouse installation will be placed upon pilings inserted into the river bottom. Installation of the pilings during construction will cause some temporary turbidity. The temporary turbidity that may be occasioned as a result of installation of the pilings will last only a few days at most, and a turbidity curtain will be used to control the turbidity, to prevent it from disbursing over a large area of the river. Turbidity curtains are a well- recognized, proven method for minimizing short-term water pollution violations due to turbidity occasioned by the setting of pilings for such projects. Requiring the applicant to re-vegetate the shoreline and maintain the natural vegetation will enhance natural shoreline pollution up-take processes, as well as erosion prevention. Water quality will be maintained, therefore, and possibly improve somewhat at the site after the re-vegetation of the shoreline and littoral margin. No other water quality parameters were shown to be potentially violated by the installation proposed. So long as no boat maintenance operations which involve the potential spillage of oils and greases, solvents, or bottom paint into the water are practiced, no violations were shown to potentially occur. The permit, if granted, should be restricted against such activities. Public Interest Standards and Considerations The issues and inquiry concerning the public interest standards as to this project related to the question of impacts on recreational uses of the river and navigational uses, as well as the issue of any impacts on manatees. The Department's biology expert, as well as manatee experts presented by the Intervenor, established that the Withlacoochee River is frequented by manatees, but is not a warm-water habitat for manatees. Manatees use the Withlacoochee River during the spring and summer months, but rarely during the winter because it is not a warm-water habitat. The river has been designated as an essential habit for manatees, however. This means that the area is used by them as a food source and as a breeding and rearing area. Although manatees have been seen throughout the length of the river and the immediate vicinity of the project site, the animals mostly use the estuarine mouth or lower reaches of the river. The project on the Kline property is approximately 8 miles upstream from the mouth of the river. There is no question that boats pose definite hazards to manatees through striking manatees with boats and propellers. Boats have been the cause of manatee deaths in Citrus County in the past. Manatees are an endangered species. The Withlacoochee River currently has speed zone regulations involving the requirement of boat operation with no wake, and Citrus County imposes certain dock design criteria on residents seeking to construct new boat docks. The Intervenor's manatee experts participated in the development of these dock design criteria and agree that general adherence to these criteria minimizes potential impacts on manatees. The expert witnesses produced by the Intervenor were mainly concerned with projects of this type causing possible impacts on manatee travel patterns if the dock projects too far from the shore, as well as potential loss of food sources from shading of the water bottom and the question of attendant boats adhering to speed zone regulations. The evidence establishes that the proposed dock will not exceed in a significant way the dock design criteria which the manatee experts agree would minimize any potential impacts on the animals. The experts testifying for the Intervenor had never visited the proposed project site and are unable to do more than make general observations and conclusions regarding any potential adverse impacts to manatees that the proposed project might have. One of the Intervenor's witnesses agreed, however, that the removal of portions of the existing dock structure would help revitalize aquatic vegetation to increase sunlight penetration which would benefit shoreline vegetation and the manatee habitat. The proposed project was shown not to affect manatee travel patterns and it will not have adverse shading impacts on aquatic vegetation due to the design of the facility, which will allow maximum sunlight penetration of the water column. Appropriate speed zones will be maintained during and after construction with the aid of signage warning Kline and the boating public of the need to adhere to "manatee friendly" boat operation practices. The testimony of both Kline and the Petitioner's witnesses establishes that both residents along the river and visitors frequently boat on the Withlacoochee River and there is a significant amount of boat traffic. Certain geographical restrictions such as river width, already existing dock and boathouse structures, the U.S. 19 Highway bridge, and the island between the Kline's property and the mouth of the river at Yankeetown act to limit the size of boats that can traverse this section of the river, as well as their speed. The witnesses agreed that two 16-foot beam boats could safely pass each other in front of the Kline dock even after completion of the project. The proposed project will be visibly marked with reflectors around its entire parameter with a minimum of one reflector on each piling as required by specific condition #15 in the intent to issue the proposed permit. Testimony from licensed boat captains presented by both the Petitioner and Kline establishes that reflectors are a normal requirement and are adequate for structures of this type and size. Kline presented evidence from a longtime native of Inglis, Bill Hart, that a structure with similar dimensions to the proposed project is located in the river at a point where the river is only 95 feet wide, significantly narrower than the width at the project site and yet does not obstruct navigation. That structure also is marked with reflectors and was shown not to pose a hazard to navigation. Witnesses adduced by Petitioner expressed concern that during high tide, the Kline's boat would be moored outside the boat cover and further decrease the river width available for navigation. The evidence showed, however, that Kline's boat would only be moored at the designated mooring location as required by specific condition #14 of the intent to issue. If necessary, Kline will be required to move the boat and anchor it down the river in an area of sufficient width if it should prove that his boat cannot be accommodated under the boat cover during some high tide conditions. Petitioner's witnesses also expressed concern that boats could not turn around in front of the Kline property when the installation is completed. The evidence showed, however, that boats can travel downstream and turn at the island or travel upstream to the U.S. 19 bridge. The U.S. 19 bridge pilings are approximately 20 feet apart which allows easy boat passage between them. The presence of Kline's boat will not represent any increase in boating traffic on the river. The previous owners of the same property used an existing dock to moor their boat. The evidence establishes that the proposed project will not cause a serious impediment to navigation more than is already the case and will not constitute a navigational hazard. The Petitioner's witnesses also expressed fears concerning reduction in the aesthetic quality of the view of the river and its banks. The river still enjoys some portion of tree canopy but is now largely characterized by man-made structures along both banks. Most residents in the vicinity of the Kline property already have docks, seawalls and/or boathouses. The installation of the proposed dock and boathouse or cover will not in any significant degree further impair the aesthetic quality of the view of the river and its banks from its present character. Cumulative Impacts Testimony from the Intervenor's expert witnesses showed concern regarding cumulative impacts of the proposed project on manatees and the "precedent" of granting Kline a permit. The Intervenor's witness feared that many people would apply for more boat docks on the Withlacoochee River and that Kline's project would set a bad precedent, if granted, as to cumulative impact. No evidence was presented to substantiate these concerns, however, and there was no showing that more such permit applications are pending before the relevant regulatory agency. The Department's expert witness established that no cumulative impacts could be expected from this project with regard to water quality, as well as the various public interest standards embodied in Section 403.918(2),(1-7), Florida Statutes. The Department itself has not received any other applications for similar projects in the vicinity.

Recommendation Having considered the foregoing Findings of Fact, Conclusions of Law, the evidence of record, the candor and demeanor of the witnesses, and the pleadings and arguments of the parties, it is RECOMMENDED that a Final Order be entered by the Department of Environmental Protection directing that the Respondent/applicant, William Kline's application for the above-referenced dock terminal platform and boat cover be granted under the conditions found hereinabove and contained in the intent to issue. DONE AND ENTERED this 29th day of November, 1993, in Tallahassee, Florida. P. MICHAEL RUFF Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 29th day of November, 1993. APPENDIX TO RECOMMENDED ORDER, CASE NO. 93-264 Petitioner's Proposed Findings of Fact The Petitioner does not state separate proposed findings of fact. Any proposed factual findings are inextricably entangled with extensive argument on the quantity and quality of testimony and other evidence and attempts to argue the Petitioner's position from the standpoint of documents referenced in the proposed findings of fact without an indication whether those documents are admitted into evidence or not. The Recommended Order can only be based upon testimony and evidence actually admitted and subject to cross-examination at hearing. The relevant and material issues raised in this case are delineated in the Recommended Order and have been fairly addressed and ruled upon and to the extent that the Petitioner's proposed findings of fact are in agreement with the findings of fact enunciated by the Hearing Officer, they are accepted. To the extent that they are not they are subordinate thereto and not supported by preponderant evidence and are rejected. Citrus County (Intervenor) Proposed Findings of Fact 1. Accepted to the extent not inconsistent with the findings of fact made by the Hearing Officer concerning standing. 2. Accepted to the extent not inconsistent with the findings of fact made by the Hearing Officer concerning standing. 3-7. Accepted. 8. Rejected, as irrelevant and immaterial. This is a de novo proceeding and the evidence adduced by a party, including the Department of Environmental Regulation, now known as the Department of Environmental Protection, at hearing and subject to cross-examination, is the only evidence or information upon which findings of fact and conclusions of law may be made. 9-10. Rejected, as irrelevant and immaterial. This is a de novo proceeding and the evidence adduced by a party, including the Department of Environmental Regulation, now known as the Department of Environmental Protection, at hearing and subject to cross-examination, is the only evidence or information upon which findings of fact and conclusions of law may be made. 11. Rejected, as not in accord with the preponderant weight of the evidence and for the reason that these are de novo proceedings and the quantity, quality, and credibility of testimony and evidence adduced at hearing is the basis for findings of fact and conclusions of law adjudicating this proceeding. 12. Rejected, as not in accord with the preponderant weight of the evidence and for the reason that these are de novo proceedings and the quantity, quality, and credibility of testimony and evidence adduced at hearing is the basis for findings of fact and conclusions of law adjudicating this proceeding. 13-14. Rejected, as immaterial and irrelevant in this de novo proceeding involving Chapter 403, Florida Statutes, and rules promulgated thereunder. Accepted, but not itself materially dispositive of the issues to be adjudicated in this proceeding. Accepted, but not materially dispositive of the issues material and relevant to adjudication of this proceeding. Rejected, in accordance with the ruling on motion in limine in this proceeding as immaterial, as not supported by the preponderant weight of the evidence and subordinate to the Hearing Officer's findings of fact. The competent, substantial evidence of record adduced at the hearing shows that the water quality considerations and public interest considerations embodied in Section 403.918(1)&(2), Florida Statutes, Section 403.919, Florida Statutes, and rules promulgated thereunder will be complied with by the project, as it is described in the evidence adduced at hearing. Rejected, as contrary to the preponderant weight of the credible evidence. Respondent Kline's Proposed Findings of Fact Any proposed findings of fact contained in the "Recommended Order" submitted by Respondent Kline cannot be separately and independently ruled upon. The document denominated "Recommended Order" submitted by Respondent Kline contains discussion and argument concerning the quantity and quality of the testimony in evidence, legal argument and, at best, is a discussion of the testimony of various witnesses, rather than coherent proposed findings. Therefore, the proposed findings of fact submitted by Respondent Kline to the extent they are proposed findings of fact are rejected as being incapable of coherent, cogent, separate rulings. Respondent Department of Environmental Regulation's Proposed Findings of Fact The proposed findings of fact submitted by the Department of Environmental Regulation, now known as the Department of Environmental Protection, to the extent they are consistent with the proposed findings of fact of the Hearing Officer are accepted. To the extent that those proposed findings of fact are inconsistent with those made by the Hearing Officer on the same issues and subject matter, they are rejected as being subordinate thereto or immaterial or not in accord with the preponderant weight of the evidence. COPIES FURNISHED: Mrs. Sarah Berger Post Office Box 83 Inglis, Florida 34449 William A. Kline, Jr. 398 South Inglis Avenue Inglis, Florida 34449 Francine M. Ffolkes, Esquire Department of Environmental Protection 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Richard W. Wesch, Esquire Assistant County Attorney 107 North Park Avenue, Suite 8 Inverness, Florida 34450 Virginia B. Wetherell, Secretary Department of Environmental Protection 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Kenneth Plante, Esquire General Counsel Department of Environmental Protection 2600 Blair Stone Road Tallahassee, Florida 32399-2400

Florida Laws (7) 120.52120.57120.68267.061373.414403.4127.09
# 6
ARTHUR B. CHOATE vs. VROOM INTERNATIONAL, ET AL., AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 80-001113 (1980)
Division of Administrative Hearings, Florida Number: 80-001113 Latest Update: Dec. 01, 1980

Findings Of Fact Vroom acquired an existing, incomplete condominium project of 96 units on the ocean side of U.S. Highway #1 at mile marker, 83.2, Islamorada, Florida. The project, now called Beacon Reef, is to be finished as a luxury facility with complete recreational facilities, including those for water-oriented sports. In February, 1980, Vroom filed a short-form application with DER for a permit to construct a private 425 foot x 6 foot pier for the condominium with four-finger piers on "T" sections, ranging in length from 335 feet to 240 feet, spaced 55 feet apart, and install 97 pilings, a maximum 450 feet seaward so as to provide one boat slip for each unit. The old existing dock will be removed (DER #3). A subsequent revision (DER #4) aligned the proposed pier with the one of Petitioner, who owns the property adjacent to the south. Following DER's appraisal (DER #1 and #2) and Vroom's agreement to use a small boat and motor to move the construction barge (DER #6), DER noticed its intent to issue the permit on May 19, 1980 on the finding that, pursuant to Sections 253.123 and 403.087, Florida Statutes, and Section 17-4.07, Florida Administrative Code, "the project will not adversely impact navigation, marine resources, nor water quality, providing the following stipulations are met: Construction shall not be initiated until Department of Natural Resources' approval is received. Construction barge shall be maneuvered in position with a small fifteen foot boat with a small 50 hp or less outboard motor. There shall be no fuel nor sewage pump-out facilities. No live-aboards shall be permitted. A day marker shall be placed approximately 30 feet waterward of each end of the outward "T" section to define and mitigate destruction of adjacent shallow water areas. Vroom accepted these restrictions and at the hearing, further agreed to place channel markers from the pier to the closest navigable point about 1/2 mile away so as to eliminate one of the concerns of the South Florida Regional Planning Council (DER #7). DER's two environmental specialists' testimony and appraisal concluded that the construction and use of the pier would not adversely impact on the water quality or biological resources nor interfere with navigation. The substrata is generally hard rock with scattered turtle grass and cuban shoal- weed found seaward as the water depth increases. This type of bottom is called "flats" as it is shallow with a uniform or gradually-sloping bottom; it is the typical feeding ground for one of the popular sports fish called Bonefish. Although these fish are easily frightened by the noise of a boat engine, the record does not reveal that this is harmful to the fish. The Petitioner speculated, surmised or opined that the use of the pier would damage or have an adverse impact on the water quality and marine resources, and interfere with navigation. However, beyond the allegations, no evidence was presented in support of these contentions.

Recommendation Upon the foregoing Findings of Fact and Conclusions of Law, it is recommended that the Department of Environmental Regulation grant the application of Vroom International, Inc. to build a pier in connection with its Beacon Reef Condominium, Islamorada, Florida, subject to the restrictions stated in the intent to issue, together with the requirement that markers be installed and maintained on either side of a channel connecting the pier and the closest and best navigable waters. DONE and ENTERED this 16th day of October, 1980, in Tallahassee, Florida. HAROLD E. SMITHERS Division of Administrative Hearings 101 Collins Building Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 16th day of October, 1980. COPIES FURNISHED: Richard H.M. Swann, Esq. GASTON, SNOW, ET AL. 2809 Ponce de Leon Boulevard Suite 550 Coral Gables, FL 33134 H. Ray Allen, Esq. Assistant General Counsel Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, FL 32301 Fred Tittle, Esq. Post Office Drawer 535 Tavernier, FL 33070 Vroom International, Inc. c/o John P. Wilson Upper Keys Marine Construction Box 18AAA Key Largo, FL 33037 =================================================================

Florida Laws (2) 253.77403.087
# 7
TOWN OF WINDERMERE vs ORANGE COUNTY PARKS AND RECREATION DEPARTMENT AND SOUTH FLORIDA WATER MANAGEMENT DISTRICT, 90-001782 (1990)
Division of Administrative Hearings, Florida Filed:Orlando, Florida Mar. 20, 1990 Number: 90-001782 Latest Update: Apr. 02, 1991

The Issue The issue in this case is whether the Orange County Parks Department is entitled to a dredge and fill permit from the Department of Environmental Regulation for the construction and installation of a boat dock on Lake Down.

Findings Of Fact The Application On November 1, 1989, Orange County Parks Department (Orange County) applied for a dredge and fill permit to construct a floating boat dock in the Town of Windermere on Lake Down. The application, which is dated September 7, 1989, describes the proposed project as a "public improvement of an existing boat ramp facility." The application describes a floating dock attached by short hinged sections to fixed docks that would be affixed, at normal water elevations, to upland. The application explains that the purpose of the dock is to accommodate boats and pedestrians in loading and unloading boats at the ramp. The dock would, according to the application, reduce wave and wakedisturbance action on the existing shoreline and thus reduce the current rate of erosion at the site. The application assures that no existing vegetation would be disturbed except in the area of the fixed docks. According to the application, the floating dock and two fixed docks would measure about 420 feet long by 7 feet wide with several wideouts of about 10 1/2 feet. The dock is designed to moor 15-18 boats simultaneously. The location map attached to and a part of the application shows that the dock would be at the southernmost extent of Lake Down. The survey attached to and a part of the application provides submerged and upland elevations in the vicinity of the proposed dock. The survey states that the water elevation of Lake Down is 98.8 feet. Nothing indicates whether 98.8 feet is the average water elevation or the water elevation on the date of the survey on June 28, 1989. Other portions of the application describe the composition of the dock parts. The only parts in contact with the water would be galvanized steel pilings, which would be jetted or driven not more than 15 feet deep into the submerged bottom, and plastic floats attached to the bottom of the dock for floatation. The application also indicates that construction-period turbidity would be controlled through the use of turbidity curtains. Another diagram attached to and a part of the application superimposes the dock over the submerged elevations. A note on the diagram states that, under "Plan 1 and Plan 2, Orange County would excavate existing grade under floating dock to elev 97.0." The applicant proposed excavation under the dock due to the shallowness of the water under and lakeward of the dock. The diagram depicts a dock that would run parallel, rather than perpendicular, to the shore. The diagram discloses that the proposed dock would begin immediately east of the existing boat ramp. The diagram indicates that the floating dock runs about 390 feet. The elevation at the northwest corner of the west fixed dock is about 100 feet. At what the construction drawings call "average lake elevation" of 99.5 feet, the piling at the northwest corner of the west fixed dock would thus not be submerged. About 15 feet to the east of the northwest corner, where a hinge connects the west fixed dock to the floating dock, the elevation is between 98 and 99 feet. At average water elevation, the shoreside of the floating dock generally ranges from five to ten feet from the shoreline, with extremes of one foot at the southeast corner of the west fixed dock and 17 feet about 220 feet east of this point. The submerged elevations change significantlyunder the 390 feet of floating dock. On the lakeside, where boats would dock, the following elevations exist under the dock at 40 Dock interval 40' 80' 120' 160' Lakebottom elevation 95-96' 95' 92' 93' 200' 240' 280' 320' 360' 390' 91-92' 91' 92-93' 93-94' 96' 96' The submerged elevations are higher (and thus water depths shallower) on the shoreside of the dock, which would not be accessible to boats. For the back of the floating dock, the submerged elevations exceed 97 feet for the westernmost 40 feet and a short segment at the eastern end of the floating dock; the remaining elevations are less than 97 feet. Unlike the west fixed dock, which would stand almost entirely in upland even at average water elevation, the east fixed dock would stand almost entirely in water at the same water elevation. Also, the west fixed dock would be relatively small and run parallel to the shore beside the ramp. The east fixed dock would be oriented in a northwesterly direction from, and perpendicular to, the shore. The northwest and northeast faces of the east fixed dock would be accessible by boats. The submerged elevation under the northwest face, which is between 15 and 20 feet offshore from the average shoreline, is between 95 and 96 feet. The water depth adjoining the northeast face is shallower because the northeast face, although accessible to boats, would runupland, past the average shoreline at 99.5 feet, to an upland elevation of about 101 feet. The rate of drop of submerged elevation is uneven along the length of the proposed floating dock. Water depth increases more rapidly from the center of the floating dock. For instance, at the 200-foot interval from the west end, the elevation drops from about 91.5 feet at the front of the dock to 88 feet at a point ten feet lakeward of, and perpendicular to, the dock. In other words, the water becomes 3 1/2 feet deeper in the first ten feet. The lakebottom drops more gradually at the west and east ends of the proposed dock. For instance, at the 40 increase in depth ten feet out is only about 2 1/2 feet. At the north corner of the east fixed dock, the increase in depth ten feet out is only about 1 1/2 feet. The diagram also depicts the existing boat ramp that would be served by the proposed dock. The ramp, which is oriented in an eastnortheasterly direction from the shore, is less than ten feet north of the proposed west fixed dock. The ramp measures about 20 feet wide upland and about ten feet wider farther out into the water. The elevation of the submerged north corner of the lakeward end of the boat ramp is between 94 and 95 feet. The elevation of the submerged south corner of the lakeward end of the boat ramp is between 95 and 96 feet. The lakebottom isfairly flat at the boat ramp. Over its 40-foot length, the elevation of the ramp changes by only about 5 feet. A separate diagram attached to and a part of the application depicts the floats that would be attached to the bottom of the decking. The floats would be about 18 inches high and draw about three inches of water when the dock is supporting no weight. A 40-inch high railing would run along the back of the dock. However, the railing would not extend along the northwest and northeast faces of the east fixed dock. Thus, nothing would deter a boat from docking along these two faces of the east fixed dock. On November 9, 1989, Orange County filed an application amendment, which contains drawings that eliminate all excavation. The amendment states: "Dock will be relocated if conflict with existing shore occurs." This amendment was filed at the urging of a DER representative, who would not have recommended the application for approval without the change. There are other suggestions in the record that Orange County would be willing to amend its application to locate the proposed dock farther from shore and in deeper waters. However, Orange County did not specifically offer an amendment, and the record offers no indication where the dock would be, if Orange County again amended the application. On June 20, 1990, Orange County informed the Department of Environmental Regulation (DER) by letter that the legal description provided with the application was inaccurate. The letter provides a new legal description and a list of adjoining property owners. Mr. Rosser, Ms. Grice, and Mr. Patterson own property adjacent to the proposed project or reside in close proximity to Lake Down so as to be substantially affected by any material degradation of water quality. The new legal description encompasses only 1.46 acres rather than the 12.16 acres set forth in the original application. The land eliminated from the application is west and north of the existing boat ramp. Orange County plans to make considerable improvements to the existing boat ramp, such as by the addition of substantial parking and a septic tank on the land eliminated from the original application. However, the present application does not request any permit for such work. The Intent to Issue On February 26, 1990, DER filed an Intent to Issue the permit for which Orange County had applied. The Intent to Issue indicates that the permit is to construct a floating dock on Lake Down about 420 feet by 7 feet, plus wideouts, and notes that the request to dredge along the dock had been withdrawn. According to the Intent to Issue, the bank between the north side of Conroy-Windermere Road and the shoreline has eroded, probably as a result of boaters pulling their boats onto shore for temporary mooring. Although DER did not determine the water elevation on the date of the inspection, the Intent to Issue reports that water depths range from a few inches alongshore to about three feet at the shoreside of the proposed dock. The Intent to Issue notes that Orange County is currently trying to condemn the land north and west of the boat ramp to upgrade the launching facility with a larger ramp, picnic area, and parking spaces for between 50 and 100 vehicles. The Intent to Issue finds that the proposed docking facility and its associated boat traffic would not result in violations of state water quality standards nor degradation of ambient conditions in Lake Down or the Butler Chain. Except for limited construction-period turbidity, which could be controlled with a siltation barrier, displacement or disruption of the lakebottom would reportedly occur only during piling installation, and shoreline vegetation would be removed only at the fixed docks at either end of the floating dock. Addressing prop dredging, the Intent to Issue notes: It is not anticipated that damage to the lake bottom will result from boats moving into and away from the dock. If water levels fall to particularly low levels, the county can close the ramp until adequate depth is available again. Addressing the possibility of increased boat traffic on the lake, the Intent to Issue states: It is not anticipated that use of ramp will significantly increase as a result of the proposed construction. Those individuals who are seriously interested in accessing the Butler Chain have done so despite the poor facility currently available. The new dock will provide mooring capability without causing shoreline erosion. Furthermore, the dock will provide a safer place for boatersto walk and wait. Presently, because there is no onsite parking nor mooring available, boaters park vehicles to the east of the boat ramp site in an undeveloped parcel. They then walk west along Conroy-Windermere Road while sharing the road shoulder with vehicles and trailers. The dock, in combination with the proposed (upland) sidewalk won't shorten the distance to be walked but will remove pedestrians from the roadway sooner to the relative safety of the mooring area. The Intent to Issue concludes that Orange County has provided reasonable assurance that the project will not result in violations of state water quality standards and that the project is clearly in the public interest. Thus, DER expressed its intent to issue the permit, subject to various conditions, in the absence of a timely filed petition. Specific condition 7 of the Intent to Issue addresses the issue of prop dredging: When the lake level drops to the point where boats entering and leaving the dock cause damage to submerged bottoms in the immediate area, the county shall close the ramp and dock until the water returns to acceptable levels. Specific condition 8 addresses the County's plans for additional improvements for the boat ramp facility: Issuance of a permit for the dock does not guarantee nor infer issuance of a permit orpermits for further improvements to the county boat launching facility. Additional Findings Regarding Upland Orlando and the more densely populated areas are generally to the north and east of the boat ramp; Orlando itself is about 10 miles away. The center of the Town of Windermere, which numbers about 1400 persons, is to the west of the boat ramp. About 80% of the users of the boat ramp approach the ramp from the east. A small vehicle-maneuvering area adjoins the ramp on the west. After unloading the boat into the water, the driver of the trailer-towing vehicle typically drives east on Conroy-Windermere Road about 1600 feet and parks on the south side of the road in a large unimproved lot. The County's permission to use the lot is terminable by the owner without notice. While the vehicle and trailer are being parked, the person or persons with the boat normally start the engine and idle just offshore from the ramp or moor on the sandy beach immediately east of the boat ramp. After parking the vehicle, the driver generally crosses to the north side of Conroy-Windermere Road and walks along a sidewalk running from the parking area to what would be the east end of the proposed dock. The road and the sandy beach are separated by a thin strip of thick vegetation. Pedestrians continuing westalong the road, past a point across from the east end of the beach, must walk in the staging lane designed for vehicles waiting to enter the maneuvering area. An existing sidewalk on the south side of the road, which runs east of the ramp area, is not used as much because the sidewalk ends almost 800 feet east of the parking area. Pedestrians typically rejoin their boat at some point along the sandy beach immediately east of the boat ramp. When the boat is spotted, the pedestrian cuts through the vegetation on one of four or five paths running at intervals between the north side of the road and the beach. Traffic on these paths has worn them down noticeably from the prevailing elevations on either side. The same pattern is repeated upon the return of the boat, which is temporarily moored onshore to allow the driver to disembark, take the nearest path to the road, walk along the north side of the road to the parking area, cross the road, and return with the vehicle to the boat ramp. Normal summertime usage, when the boat ramp is used more frequently, involves a range of 30-65 boat launchings per day from the boat ramp. However, peak usage is much higher; nearly 400 trailers have been in the parking area at one time. Present upland usage of the boat ramp area is risky. The staging lane mixes pedestrians and motor vehicles towing trailers. The speed limit on Conroy-Windermere Road is 35 miles per hour at the parking area and 30 miles per hour at theramp, so westbound traffic is still moving rapidly past the staging lane. Also, Conroy-Windermere Road, which is an urban collector, is heavily travelled with an average daily traffic count of 9400 vehicles. Pedestrians crossing the road at the parking area 1600 feet west of the ramp must cross 22- 24 feet of highway. Pedestrians crossing the road at the boat ramp must cross about 50 feet of highway due to the presence of the staging lane and a painted median. Upland safety would be enhanced by separating pedestrians from the staging lane. However, the addition of the floating dock would not eliminate the risks associated with upland usage of the boat ramp. Persons still would be required to cross Conroy-Windermere Road, although a proposed crosswalk would reduce present risks somewhat. In addition, the existing sidewalk on the north side of the road would be reconfigured to lead to the floating boat dock, which would be incorporated into the sidewalk system leading toward the center of the Town of Windermere. For some persons using the dock segment of the sidewalk, such as young children and the disabled, close proximity with the water and mooring boats might prove unsafe. Conroy-Windermere Road has existed for many years, but the portion of the road parallel to the proposed dock was added only about 30 years ago. Previously, the road had turned south, but, following a serious traffic accident, the curve was straightened. Large amounts of fill were added to form the roadbed across the southern tip of Lake Down, which consequentlywas cut off from the remainder of the lake. This fill forms the bank leading to the shoreline directly parallel to the proposed dock. The boat ramp has also existed for many years. Years ago, grove trucks drove down to the lake in order to take on irrigation water. From time to time, persons would put in canoes at this point. Until the late 1960's, when Orange County paved the ramp, few if any powerboats were launched from the area or even used the lake. Today, the overwhelming majority of boats using the ramp currently are gasoline-powered motorboats. There are no restrictions on Lake Down as to the size of engine permitted on the lake, and the posted speed limit is 36 miles per hour. The area surrounding the boat ramp features few amenities. Apart from the maneuvering area, staging lane, and ramp itself, the only other improvements are an enclosed portable toilet and a dumpster garbage container. The Town of Windermere operates two boat ramps on the Butler Chain-- one on Lake Down and one on Lake Butler. Use of these ramps is reserved for Town residents and their guests. The remaining boat ramps on the chain are owned by corporations or private associations. Some boat traffic on the lake is from the use of private boat docks owned by persons owning lakefront land. Lake Down and the Butler Chain Designation as Outstanding Florida Waters By report dated January, 1984, DER recommended that the Environmental Regulation Commission designate as Outstanding Florida Waters the Butler Chain of Lakes: Lake Down, Lake Butler, Wauseon Bay, Lake Louise, Lake Palmer, Lake Chase, Lake Tibet, Lake Sheen, Pocket Lake, Little Fish Lake, and their connecting waterways. The January, 1984 report (DER Report), states that the Butler Chain drains into the Upper Kissimmee River Basin. Noting that Lake Down is the northernmost lake in the chain, the DER Report states that water flow in the lakes, which are interconnected by a series of man-made navigable canals, runs from north to south. Reviewing Florida and applicable federal anti-degradation policies protecting high quality waters, the DER Report states: This antidegradation policy is predicated on the principle that resources are so precious that degradation should not occur except after full consideration of the consequences and then only to the extent necessitated by important economic and social development. Scientifically, the principle is a valid one in that history has taught that adverse effects are difficult to predict. As scientific knowledge grows, previously unknown effects are discovered, and it is prudent to preserve our natural resources in the face of the unknown. DER Report, January 11, 1984 memorandum from DER to Environmental Regulation Commission, page 4. The Butler Chain covers 4700 acres. The largestlake is Lake Butler, which consists of 1665 acres. Lake Down, which is the third largest, consists of 872 acres. Depths of the lakes range from 15-30 feet. According to the DER Report, the upper seven lakes are oligo-mesotrophic with low productivity, high water clarity, and deeper waters. The lower three lakes (Sheen, Pocket, and Fish Lakes) are mesotrophic, with moderate productivity, high coloration of water, and shallower waters. The DER Report states that the water quality of the lakes is excellent. Lake Down had the highest level of dissolved oxygen: 7.1 mg/l. Biochemical oxygen demand was extremely low, in most cases, including Lake Down, less than 1.0 mg/l. Lake Down also had the lowest presence of chlorophyll a, which is a measure of the presence of algae, and a higher degree of biologically diversity, which is typical of a clean, soft-acid lake, according to the DER Report. The DER Report concludes that: An OFW designation will preserve the present environmental values of the Butler Chain of Lakes without any important environmental costs. The existing ecosystem and recreational use of the lakes is dependent upon the maintenance of sufficiently high levels of water quality, which an OFW designation would help to ensure. Id. at 23. The DER Report also includes a May, 1975 report of the Orange County Pollution Control Department, which concedes that the Butler Chain is: one of the few clean water systems left in the Central Florida area. The balance between available nutrient concentrations and the biotic communities has maintained an ecosystem free from the problems that are associated with more enriched systems. The balance is fragile and not well understood. Any activities which would effect this system will express itself [sic] in the aquatic habitat. May, 1975 report, page 4. At the time of its designation, the proposal received numerous endorsements and no objections. On August 16, 1983, The Orange County Board of County Commissioners passed a resolution urging DER to designate the Butler Chain as Outstanding Florida Waters. The Orange County Property Appraiser also supported the designation. In a letter to DER dated September 30, 1983, the appraiser warns that pollution could decrease surrounding property values and cost taxpayers substantial sums for cleanup. Additional Findings Regarding Lake Down Effect of Addition of Floating Dock 53. Neither the submerged galvanized steel pilings nor the plastic floats would allow materials to leach into the lake so as to affect measurably the composition or quality of the water. The increased turbidity during construction of the proposed floating dock also could be controlled so as not to have a significant effect on Lake Down. 2. Relevant Water Levels Water levels have fluctuated considerably in Lake Down. Since January, 1960, to present, the lowest recorded water elevation was 93.86 feet in February, 1987, and the highestelevation was 101.58 feet in August, 1960. Recorded water elevations were less than 97 feet from October, 1977 through August, 1979 and September, 1980 through November, 1982 (during which time the elevation attained 96 feet only six months). Water elevations were between 97 and 98 feet, inclusive, for an additional 29 months during this 31-year period. From March, 1987 through May, 1989, water levels were between 99 and 100 feet, attaining 100 feet only in December of 1987 and 1989. From June through August, 1989, water levels were between 98 and 99 feet. From September, 1989 through the date of the final hearing, water elevations were below 97.8 feet. From mid-March, 1990 through the date of the hearing, water elevations dropped from 97 feet to 96 feet; at the time of the hearing, the water elevation was about 96 feet. When the water elevation is 97.8 feet or less, the canal to Wauseon Bay and, from there, to Lake Butler is impassable to all but very small flatbottom boats. At these times, boat traffic tends to concentrate on Lake Down. Three witnesses for the County and DER testified as to the relationship between the water level of the lake and the operation of the floating dock. One witness for the County testified that the dock would float at 99.5 feet, which corresponds to ordinary high water. The designer of the dock testified that the east and west ends of the dock would cease floating at 96 feet. The DER representative testified that the dock and, pursuant to Special Condition 7, the ramp should beclosed at depths less than 95 feet. The meaning of Special Condition 7 is unclear. First, it is not clear what is meant by boats causing damage to submerged bottoms in the immediate area. Probably, this phrase means actual contact between the prop and bottom, which is known as prop dredging. Thus, boats cause damage to submerged bottoms when the depth of the water is about one foot or less. Special Condition 7 probably ignores the effect of prop wash, where the prop disturbs the bottom, including vegetation, by turbulence rather than direct contact. The second major ambiguity in Special Condition 7 cannot be resolved on the basis of the present record. The question is whether the ramp and entire dock must be closed whenever the water depth under any part of the dock is one foot or less (recognizing that the floats require about one foot of water). In the alternative, Orange County could close only that part of the dock as to which the underlying water depth is one foot or less. It is likely that DER and Orange County have different opinions on this question, with the County taking the latter position. Regardless how Special Condition 7 is construed, it fails to address the damage to submerged bottom that the"floating" dock will do when parts of it begin to ground. When partly grounded, the floating dock will pound up and down on the lakebottom in response to wave action and traffic on the dock. Over 40 feet of the shoreside of the dock will be grounded at water elevations of 97 feet or less, which, without regard to the effect of dock loading or wave action, is the point at which "dock dredging" commences. Water elevations have been less than 98 feet for a total of nearly seven of the last 31 years. The east and west ends of the lakeside of the floating dock would also begin to ground at a water level of about 97 feet. By the time water elevation falls to 96 feet, which existed at the time of the hearing, at least 80 feet of the west end of the floating dock and at least 30 feet of the east end of the floating dock would be grounded, again assuming no wave action and no load on the dock. Additionally, prop dredging would also take place at water elevations of 97 feet immediately adjacent to the dock, at its east and west ends. These water elevations have been experienced for a total of over four of the last 31 years. Another feature of the design of the proposed dock makes it likely that prop dredging will take place regardless of the water elevation. A popular area of the proposed dock would be the east fixed dock because it would be the closest point, by more than 100 yards in some cases, to the existing parking area. Boats could approach the northeast face of the east fixed dock up to an elevation of 101 feet. In other words, except in periods of unusual high water, some boats could and probably would use a section of the fixed dock in the same manner as temporary moorings are made today: in effect, by running up onto the beach. Prop dredging of the bottom would take place if boats approached the northwest face of the fixed dock when the water level fell to about 96.5 feet. The same is true for at least the first 40 feet of the west end of the floating dock. The resuspension of bottom sediment by prop wash would begin at depths of anywhere from 18 inches to seven feet, according to the testimony of the DER representative. Although important variables, such as the composition of the bottom and size and speed of the prop, affect prop wash, significant prop wash takes place for at least three feet under the prop. If three feet were the minimum depth necessary to avoid prop wash and, thus, lakebottom damage, the east 160 feet and west 70 feet of the floating dock would not be usable at water levels not exceeding 96 feet, such as at the time of the final hearing. The significance of lakebottom damage is great under and lakeward of the proposed dock. A thick carpet of bogmoss begins about ten feet offshore, which is roughly where the dock would begin, and continues out into the lake. Bog moss, which captures and retains sediments, would be damaged by the dredging action of the pounding floating dock when it begins to ground and boats using the floating dock at water elevations described in the preceding paragraphs. The phosphorus-rich sediments would then be resuspended in the water column. 3. Ambient Water Quality One of the key elements to preserving the health of Lake Down is to avoid conditions that can lead to the presence of excessive nutrients in the system. The presence of excessive nutrients, which leads to eutrophication, usually occurs because of the increased availability of a limiting nutrient. The limiting nutrient in Lake Down is phosphorus. Thus, a condition precedent to the eutrophication of Lake Down is an increase in the level of phosphorus in the water. The presence of phosphorus in the water can be detected directly, by measuring the phosphorus itself. The presence of phosphorus can also be detected indirectly, by measuring the effects of the nutrient or conditions that may result in the release into the water of additional phosphorus. Indicators of the nutrient levels of a lake include the presence of chlorophyll a, which, as a measure of the amount of algae in the water, is an indicator of the enrichment process. As a lake proceeds from an oligotrophic to a mesotrophic condition or from a mesotrophic to a eutrophiccondition, the presence of algae and chlorophyll a will increase. Indicators of conditions that may result in the release of additional phosphorus into the water include turbidity measurements and clarity data, such as Secchi depths. The sediment found in the submerged lakebottom contains greater concentrations of phosphorus in various organic and inorganic and soluble and insoluble forms than the water column itself contains. When this sediment is disturbed, part of the previously trapped phosphorus is released into the water column. The phosphorus is thereby made more readily available for supplying the nutrients necessary to contribute to the enrichment process, at least until the phosphorus settles back into the sediment where it can be locked up until redisturbed. As relevant to this case, the ambient water quality of Lake Down in the baseline year can largely be assessed in terms of the following data, which are obtained from Orange County Exhibit 13: chlorophyll a: 1.01 ug/l; turbidity: 1 NTU; total phosphorus: .01 mg/l; Secchi depth: 3.5 meters; and pH: 5.97. In the year ending immediately preceding the filing of the County's application, the following data were collected, according to Orange County Exhibit 13: chlorophyll a: 1.59 ug/l; turbidity: .75 NTU; total phosphorus: .01 mg/l; Secchi depth: over 3.5 meters; and pH: 6.36. In the summer of 1990, when the hearing took place, the County's expert collected from Lake Down the followingaveraged data, which are shown on Orange County Exhibits 15 and 17: chlorophyll a: 1.22 ug/l; total phosphorus: .011 mg/l; Secchi depth: over 4 meters; turbidity: 1.0-1.2 NTU's; and pH: 6.97. In the same summer, the Town of Windermere's expert collected the following data from Lake Down: turbidity: 0.92-1.8 NTU's; pH: up to 7.2; and total phosphate: .04-.05 mg/l. The only finding materially different from the findings of the County's expert is the amount of total phosphate. The findings of both experts are credited. The higher finding is supported by, among other things, the recording in the County's records of .037 mg/l of total phosphorus on May 15, 1990, according to Orange County Exhibit 12. In a phosphate-limited, oligo-mesotrophic lake such as Lake Down, total phosphates of .03-.04 mg/l require serious attention in terms of what may be the beginning of a significant degradation of ambient water quality standards. The increase in chlorophyll a is consistent with a trend toward enrichment of the lake since the baseline year. The record establishes the role of motorboat traffic in degrading ambient water quality. Bottom sedimentsoften contain many times more phosphorus than is found in the water column. In the case of Lake Down, sampled bottom sediment contained 11 mg/l of phosphorus, or over 200 times the amount contained in the water column. The phosphorus is trapped in the sediment, which, if disturbed, releases the phosphorus back into the water column. Prop dredging may resuspend the sediments and release the phosphorus, as well as destroy bottom vegetation that tends to retain the sediments. Prop wash also may resuspend bottom sediments, even to depths of seven feet beneath the churning prop. Ultimate Findings of Fact Impact of Proposed Dock on Boat Traffic The proposed floating dock would substantially increase use of Lake Down by motorboats. The dock would generate increased boat traffic on Lake Down because of improvements in navigability in the vicinity of the boat ramp and convenience for boaters in picking up and dropping off passengers and walking between the existing parking area and mooring area. The dock, which would be longer than a football field, is designed to moor 15-18 boats simultaneously. At typical current launching rates, the dock would be capable of mooring, at one time, one-quarter to one-half of the boats using the boat ramp on a given day. DER reasons in the Intent to Issue that boat usage would not increase significantly because persons seriously interested in accessing the Butler Chain have overcome the limitations of the present facility. This reasoning ignores persons more casually interested in accessing the Butler Chain. The above-described improvements in navigability and upland safety will increase the frequency of their visits, which presently may be limited to peak days, such as holidays. If the ratio of serious to casual users corresponds roughly to the ratio of typical boat launches to peak boat launches, the number of casual users may outnumber their more earnest counterparts by six to one. The large capacity of the proposed boat dock suggests that Orange County was targeting these more casual boaters. In theory, Special Condition 7 could have a substantial effect upon boaters' access to Lake Down if the ramp and dock were closed when water elevations fell to 97 feet, at which point much of the shoreside of the dock would already be grounding and boats could not approach the east or west ends of the dock without prop dredging. The ambiguity of Special Condition 7, whose meaning remains elusive even after DER and Orange County have had opportunities to explain its operation, precludes assigning the condition any significance, except as a clear invitation to litigate in the event the floating dock were constructed under the subject Intent to Issue. 2. Ambient Water Quality 79. As relevant to this case, the relevant ambientwater quality of Lake Down is the baseline year. The value of chlorophyll a was 50% lower in the year ending March, 1984, than in the year ending with the subject application. Total phosphorus was about the same, as were Secchi depths. Turbidity was 25% less in the latter year, but the lake had acidified slightly. 3. Changes in Water Quality The water quality of Lake Down has deteriorated since it was designated an Outstanding Florida Water. The amount of chlorophyll a has increased, which is consistent with increased levels of nutrients in the water column. By the summer of 1990, phosphate readings were as much as four or five times greater than in the baseline year and had reached a level that threatens water quality in a phosphate-limited lake such as Lake Down. The role of motorboat traffic in disturbing phosphate-laden bottom sediments and destroying bottom vegetation has been discussed above. The dock dredging at lower water elevations, which are frequently encountered, as well as prop dredging immediately adjacent to the dock, would be especially harmful in view of the thick carpet of bog moss present underneath and lakeward of the proposed dock. 4. Effect of Proposed Dock on Water Quality Orange County has failed to provide reasonable assurance that the proposed project would not lower ambient water quality standards with respect to the effects of dock dredging, prop dredging in the immediate vicinity of the dock, and prop wash associated with increased powerboat traffic on the entire lake. Boats presently mooring on the south shore undoubtedly dredge the bottom with their props. However, the effects are less destructive than the prop dredging that would be associated with the proposed dock, even ignoring the effects of dock dredging and prop wash from additional powerboats. First, fewer boats are using the area now than would be with the proposed dock. Second, although possibly once vegetated, the lakebottom adjacent to the shore is sandy without much vegetation or sediment, so resuspension of sediment and release of phosphorus is less of a problem presently than it would be with the use associated with the new dock. The record does not support a finding that the water quality of Lake Down has been adversely affected by the erosion of rubble and fill from the bank used to construct the realigned Conroy-Windermere Road 30 years ago. Concerns about unfiltered stormwater runoff bypassing the vegetated strip by pouring down the eroded paths into the lake are misplaced. Some governmental entity has installed a stormwater system along aconsiderable part of Conroy-Windermere Road, and the outfall is directly into Lake Down shoreside of the west end of the proposed dock. 5. Effect of Proposed Project on Public Interest Orange County has failed to provide reasonable assurance that the proposed project would be clearly in the public interest after balancing the statutory criteria. The proposed project would achieve a net gain in upland safety, although not without exposing pedestrians using the sidewalk to new risks. The project would also increase boater safety by improving navigability in the vicinity of the boat ramp. However, degradations in water quality negatively impact the issues of public health, the property of others, the conservation of fish and wildlife, and fishing or recreational values, which ironically may be threatened as Lake Down risks becoming a victim of its well-deserved popularity. The current condition and relative values of the functions performed by the lakebottom also militate against a finding that the proposed project, which would be permanent in nature, is clearly in the public interest. The factors in the preceding paragraph outweigh the statutory factors in favor of a finding that the project is clearly in the public interest. In addition to the gains in upland safety and navigability, the other favorable factors are that the proposed project would not adversely affect the flow of water or cause harmful erosion or shoaling. A neutral factor isthat the proposed project would not help or harm significant historic and archaeologic resources.

Recommendation Based on the foregoing, it is hereby RECOMMENDED that the Department of Environmental Regulation enter a final order denying the application of the Orange County Parks Department for a dredge and fill permit to construct a floating dock 420 feet by 7 feet. ENTERED this 2nd day of April, 1991, in Tallahassee, Florida. ROBERT E. MEALE Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 2nd day of April, 1991. APPENDIX Treatment Accorded Proposed Findings of Orange County Adopted or adopted in substance: 1-7 (except last sentence of Paragraph 6); 9 (except for last two sentences)- 11 (except first sentence); 12 (except that the amendment eliminated all construction-related dredging)-19 (except the railing in Paragraph 14 runs the entire landward side of the floating dock, but not the fixed docks); 20 (except the last sentence); 25; 27 (except last sentence); 29 (first sentence; however, the implication that the erosion is having an adverse effect on water quality is rejected as against the greater weight of the evidence); 30 (except that the implication that wave and wake action are presently eroding the shore is rejected as against the greater weight of the evidence); 32; 33 (in sense of increasing boater usage of lake, but not in sense of maintaining the water conditions on which the lake ultimately depends for its recreational value); 35-36; 39 (third and fourth sentences); 40 (there would be a net increase in upland safety); 42 (the crosswalk would somewhat increase upland user safety); 43; 44 (through the colon); 46; 48 (second and third sentences); 49 (except that the summer, 1990, findings of Windermere's expert are also credited); 51 (except as to the improvement in ambient water quality between baseline year and year immediately preceding the application); 52 (except for characterization of chlorophyll a value as very low) with attendant implication that this value, in conjunction with readings of .04-.05 mg/l of phosphate in the summer of 1990, is not cause for serious concern); 56-57; 59 (all but first sentence); 60 (second and third sentences); and 71 (last sentence). Rejected as irrelevant: 6 (last sentence); 11 (first sentence); 20 (last sentence); 21-22; 26 (second sentence); 28; 44 (following the colon)-45; 47; 54 (first sentence); 55 (there is no safe harbor for proposed projects whoseeffects would degrade ambient water quality, but still leave the waters in good condition); 67; and 74-75. Rejected as subordinate: 8; 9 (last two sentences); 28; 34 (second sentence); 41; 53; 63 (except for first sentence); 64; 69; and 74-75. Rejected as against the greater weight of the evidence: 23; 26 (first sentence); 27 (last sentence); 29 (second sentence); 31; 34 (except second sentence); 37 (except whether the proposed dock is a political "hot potato" is irrelevant); 38 (except that the existing facility is "very mediocre"); 50 (second sentence as to relevant ambient water quality and third sentence); 54; 55 (although the water quality in Lake Down remains generally good, recent readings of phosphorus levels of .04-.05 mg/l are a cause of serious concern); 58; 59 (first sentence, at least as to the bottom beginning around where the dock would be placed); 60 (first sentence); 61 (the County's own survey, which accompanied the application, has been credited over the incidental findings of an expert, who did not carefully establish the exact proposed location of the dock and was preoccupied with water sampling); 62 (strictly speaking, the County has failed to provide reasonable assurance that the boat dock will not lead to degradation in ambient water quality); and 63 (first sentence)-71 (except for last sentence). Rejected as unnecessary: 39 (first two sentences) and 72-73. Rejected as recitation of evidence: 48 (first sentence) and 50 (first and second sentences except for the identification of the baseline year and the year immediately preceding the application). Miscellaneous: 24: first sentence is adopted in substance as the average is probably about 10', although the distance is as much as 17'. The second sentence as to where the boat dock could be built--i.e., further away from theshore to reduce or eliminate dock dredging--is rejected as irrelevant. Orange County did not offer to amend its application, nor even provide a new location for the dock. In any event, the relocation of the dock in deeper water would not reduce the damage done to the lake by the prop wash associated with the additional boat traffic that the new dock would generate. Treatment Accorded Proposed Findings of DER Adopted or adopted in substance: 1-5 (except erosion-protection clause in Paragraph 4); 6 (first sentence, although the elevations have been discussed in detail in the findings and, though the dock probably averages about 10' from normal shoreline, it is as much as 17' offshore); 7-14 (except, as to Paragraph 8, 41-65 launchings represents typical summertime usage and 395 represents peak usage, probably on a holiday); 18; 19 (second sentence); 26-28; 30 (first sentence); 33-34; 37-39 (except, as to Paragraph 38, first sentence and last clause implying the need to control erosion to protect water quality); 41-42; and 46-47. Rejected as against the greater weight of the evidence: 4 (erosion-protection clause); 6 (second sentence because the County's own survey, which accompanied the application, has been credited over the incidental findings of an expert, who did not carefully establish the exact proposed location of the dock and was preoccupied with water sampling); 15 (except second and fourth sentences); 16 (first sentence); 17; 19 (first and second sentences); 25; 29-32 (except first sentence of Paragraph 30); 35; 36 (except first sentence); 38 (first sentence and last clause implying the need to control erosion to protect water quality); 40; and 43-44. Rejected as recitation of evidence: (second and fourth sentences). Rejected as irrelevant: (second through fourth sentences) and 19 (third sentence--there is no safe harbor forproposed projects whose effects would degrade ambient water quality, but still leave the waters in good condition--and last sentence). Rejected as unnecessary: 19 (last sentence as to benzene); 21-23 (except that the facts of this case, such as the quick elimination of benzene from the water and the proximity of sampling to boat periods of numerous boat launches and no rain, suggest that gasoline-powered boats, not stormwater, are responsible for most of the benzene finding its way into Lake Down); 24-25; and 45. Rejected as subordinate: 20. Rejected as repetitious: 36 (first sentence). Treatment Accorded Proposed Findings of Windermere Adopted or adopted in substance: 1-14 (except last sentence of Paragraph 11); 18-19; 26 (first and last sentences); 28 (first three sentences through "not be floating" and third and second to last sentences, although the prospect of either DER or orange County interpreting Special Condition 7 as requiring the closure of the entire facility for significant periods of time is highly remote); 33-34; 35 (as to intention to construct crosswalk); 38; 40 (first three sentences); 42 (first three sentences); 46 (first sentence); 49 (second sentence); 50 (except second sentence); 51 (first sentence); 52 (except last sentence); 54-57; 59 (first two sentences)-61 (except for final sentences in Paragraphs 60, as to benzene, and 61); 62; 65 (last sentence); and 67. Rejected as subordinate: 11 (last sentence); 15-17; 21-25; 27; 28 (all sentences not adopted in whole); 29-32; 35 (except as to intention to construct crosswalk); 36-37; 39; 40 (last sentence); 42 (last three sentences); 43-45; 46 (fourth sentence); 48; 49 (third and fourth sentences); 63; 65 (except last sentence); and 68-71. Rejected as irrelevant: 16; 20; 22; 49 (first sentence); and 53. Rejected as recitation of evidence: 26 (all but first and last sentences); 31; 35 (except as to intention to construct crosswalk); 41; 44-45; and 46 (second and third sentences). Rejected as against the greater weight of the evidence: 28 (portion of third sentence following "not be floating"; Orange County's position as to the meaning of Special Condition 7 did not emerge from the record, largely because of an apparent lack of detailed understanding of the impact upon the submerged bottoms of particular water elevations in terms of dock dredging and prop dredging); 50 (second sentence); 51 (second sentence); 64; and 66. Rejected as unnecessary: 47; 52 (last sentence); 58-59 (last two sentences); 60 (as to benzene); and 61. Treatment Accorded Proposed Findings of Rosser and Grice Adopted or adopted in substance: 1-39 (as to Paragraph 18, the only navigable connection and, as to Paragraph 19, the surface elevation); 45; 51 (at least as to desirability); 57 (except first sentence); 58; 59; 61-64 (except last sentence of Paragraph 64); 66 (second sentence); 68-69; 74 (fourth sentence); 75-76; 80-81; 83; 86; 88; 89 (the specific elevations have been discussed in detail in the order); 94; 96; 97; and 102. Rejected as irrelevant: 40-42; 52-55; 70-72; 74 (third and last sentences); 77-78; 84; 90; 101; and 103. Rejected as subordinate: 43-44; 46-50; 53-55; 57 (first sentence); 60; 73-74 (first and second sentences); 82 (first sentence); 85; 99-100; and 104-05. Rejected as unnecessary: 56; 59; 64 (last sentence)-66 (first sentence); 91-92; 95; and 98. Rejected as against the greater weight of the evidence: 67; 82 (second sentence); 87; and 93. COPIES FURNISHED: Douglas H. Maclaughlin Assistant General Counsel Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, FL 32399-2400 Joel D. Prinsell, Assistant County Attorney Eugene Legette, Assistant County Attorney Orange County Legal Department P.O. Box 1393 Orlando, FL 32802-1393 J. Christy Wilson, III Brigham, Moore, et al. 111 N. Orange Avenue, Suite 1575 Orlando, FL 32801 J. Stephen McDonald John M. Robertson Robertson, Williams, et al. 538 East Washington Street Orlando, FL 32801 Robert W. Williams P.O. Box 247 Windermere, FL 34786 Carl D. Patterson, Jr. 219 Third Avenue Windermere, FL 34786

Florida Laws (6) 1.01101.58120.57267.061380.06403.412
# 8
LUCILE F. KEELY vs. HARRIET STOKES AND DEPARTMENT OF ENVIRONMENTAL REGULATION, 78-002224 (1978)
Division of Administrative Hearings, Florida Number: 78-002224 Latest Update: Jun. 09, 1980

Findings Of Fact Based upon my observation of the witnesses and their demeanor while testifying, the arguments of counsel and the entire record compiled herein, the following relevant facts are found. Harriet Stokes purchased the Largo Motel during August of 1967. The motel consisted of six (6) units with a boat basin and dock which adjoined the site. When the property was purchased, the boat basin was navigable from the motel to the open waters of Tarpon Bay. Tarpon Bay is a Class III water body. A representative number of Ms. Stokes' residents and patrons bring in trailered boats ranging in size, approximately fourteen (14) to eighteen (18) feet. Since approximately 1974, silting has occurred in the basin in the immediate area approaching the dock area. The silting has rendered the dock virtually unnavigable except in cases where boat owners are able to access the open waters by poling". Evidence reveals that a number of boat owners have broken their propellers attempting to gain access to the open waters of Tarpon Bay. Based thereon, residents are cautioned against attempting to launch boats from the dock area, which has resulted in a decline of Respondent's fish and pleasure boating guests (Testimony of Harriet Stokes). Johnny DeBrule, the Heavy Construction Superintendent for the Upper Keys Marine Construction Company, Key Largo, Florida, was consulted by Respondent Stokes for completion of the dredging work called for in the subject application. Mr. DeBrule gave his opinion that the subject project could be excavated with a backhoe equipped with a material handling bucket with minimal interruption to the adjacent waters. Richard Dumas, an Environmental Specialist employed by the Department since approximately November, 1977, conducted the initial field site inspection which resulted in the Department's first report recommending issuance of the permit application (Respondent's Exhibit 1). Mr. Dumas testified that he failed to consider the proper standards when he initially issued his first site inspection report which recommended approval of the project as applied for. Dumas was part of the inspection team which included Messrs. Michael Nowicki, Curtis Kruer, and Attorney Ray Allen. After the second field inspection survey was made during December, 1979, the team unanimously concurred that the project as applied for did not entail maintenance dredging and, further, that based upon an in-depth inspection during the second visit, the project, as applied for, was not permittable. Mr. Dumas's earlier recommendation which favored the approval of the subject project was prompted in large part by the policy consideration of the economic viability of Mrs. Stokes' motel enterprise. Michael Nowicki (Nowicki), a Dredge and Fill Supervisor employed by the Department in its Punta Gorda office, is in charge of processing short form dredge and fill applications. As part of his employment duties, Nowicki makes recommendations to the District Manager on short form applications and as part of this review process has reviewed and appraised approximately three thousand (3,000) dredge and fill applications. Nowicki was involved with the formulation and review process of the subject application. During the inspection on this project on December 10, 1979, the dredging was determined not to be "maintenance dredging" since the dredging "would occur in an area of exposed caprock bottoms situated approximately six (6) to nine (9) inches below the surface waters and would result in the destruction and elimination of the thriving benthic community" (Testimony of Kruer, Nowicki and Dumas). In this regard, during May of 1979, Dumas conducted water samplings in the immediate areas of the proposed project and noted that there was a very diverse and productive benthic algal community which was surviving on the nursery and feeding grounds supplied by the grass flats and natural shorelines (Testimony of Dumas and DER Exhibits 10 and 11). Subsequent inspections by Curtis Kruer corroborate this fact. Curtis Kruer, an Environmental Specialist received as a marine biology expert in this proceeding, performed an on-site inspection of the proposed project on December 6, 1979. Kruer made several probings in the area and found that natural caprock was present in the very shallow areas of the bay bottoms. He found that approximately 70 percent of the area was very diverse and highly vegetated. For example he found that the bay bottom is composed of approximately 30 percent benthic algae, 30 percent silt and organic detritus, and approximately 40 percent sea grasses. The most abundant seagrasses were turtle grass with a small amount of Cuban shoalgrass near the boat ramp. Kruer noted that the vegetated bottoms serve as nursery grounds for the area's marine community which consisted of several varieties of juvenile commercial and recreational fish and shellfish (DER Exhibit 11). Kruer noted that adjoining dredged areas immediately adjoining the proposed project have not revegetated and that there are thick layers of silt and organic materials on this site. He further noted that the project would conflict with the natural shoreline and that there were reasonable alternatives which would provide favorable and less destructive uses for the Petitioner's boat basin. Among the alternatives suggested by Kruer was a boat dock with piers supported by pilings of adequate depth in the project's bay bottoms (DER Exhibit 11). Finally, Kruer noted that the proposed dredged area contains productive vegetated benthic communities which will only revegetate, if at all, over extended periods of time (DER Exhibit II).

Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law, it is hereby RECOMMENDED that the Department enter its final order denying the application for a permit to dredge approximately 5,400 square feet of silt from the boat basin at Largo Lodge, Key Largo, Monroe County, Florida. RECOMMENDED this 22nd day of April, 1980, in Tallahassee, Florida. JAMES E. BRADWELL Hearing Officer Division of Administrative Hearings Room 101, Collins Building Tallahassee, Florida 32301 (904) 488-9675 COPIES FURNISHED: Ms. Lucile Keely 5797 La Luneta Avenue Miami Florida 33155 Michael Egan, Esquire ROBERTS & EGAN, P.A. Post Office 1386 Tallahassee, Florida 32301 H. Ray Allen, Esquire William W. Deane, Esquire Assistant General Counsel Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32301 Jacob R. Varn, Secretary Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, Florida 32301

Florida Laws (4) 120.57120.60253.12403.812
# 9
DEPARTMENT OF ENVIRONMENTAL REGULATION vs. DONALD M. AND MARY LOU STEARNS, 89-001706 (1989)
Division of Administrative Hearings, Florida Number: 89-001706 Latest Update: Feb. 22, 1990

The Issue The issue in Case No. 89-1706 is whether the Stearns violated provisions of Chapter 403, Florida Statutes, in the construction of a dock on the Indian River. The issue in Case No. 89-1707 is whether Mr. Stearns is entitled to a dredge and fill permit for the construction of the above-described dock.

Findings Of Fact The Stearns reside at Sunrise Landing Condominium in Cocoa, Florida. The condominium complex lies on the western shore of the Indian River in north Brevard County. At this location, the Indian River is classified as a Class III water and is conditionally approved by the Department of Natural Resources for shellfish harvesting. By Purchase Agreement dated February 18, 1987, the Stearns agreed to purchase a unit at Sunrise Landings Condominiums from the developer. By subsequent Purchase Agreement Modification, the parties agreed that the Stearns had "permission to build a private boat dock providing buyer obtains all proper permits from the Army Corps of engineers and all other proper authorities." By Warranty Deed dated April 16, 1987, the developer conveyed the unit to the Stearns. The deed, which conveys a 1/72nd interest in the common elements, does not convey any right to build a dock. The deed states that the conveyance is subject to the Declaration of Condominium of Sunrise Landing II. The declaration, which was recorded prior to the deed to the Stearns, defines as Common Element the land lying adjacent and upland to the dock that the Stearns constructed. The declaration states that each unit owner owns an undivided share of the Common Element. Article III, Section 7 states: The Owner of a Unit . . . shall be entitled to use the Common Elements in accordance with the purposes for which they are intended, but no such use shall hinder or encroach upon the lawful rights of Owners of other Units. There shall be a joint use of the Common Elements . . . and a joint mutual easement for that purpose is hereby created. In February, 1987, prior to closing on their unit, the Stearns arranged with an individual named Kurt Ramseyer to construct the dock. Mr. Ramseyer completed construction of the dock on or about July 3, 1987. On or about February 22, 1987, Mr. Stearns executed an application for permit for activities in the waters of the State of Florida. The application warned the applicant that he must obtain all applicable authorizations before commencing work. The application, as well as all others completed by Mr. Stearns, was the joint Department of the Army/Department of Environmental Regulation form, effective November 30, 1982. The application describes the project as a dock consisting of two boat slips measuring 24 feet by 10 feet, a 24 foot by 4 foot pier, and a 12 foot by 12 foot deck. The application identifies as the adjacent property owners the individuals owning condominium units on either side of the Stearns' unit. Mr. Stearns did not complete the affidavit of ownership or control, in which the applicant attests that he is the record owner or, if not, will have "the requisite interest . . .before undertaking the proposed work." The Department of the Army received the application on May 11, 1987. At this time, a copy of the application was forwarded to the Department of Environmental Regulation ("DER") without the required application fee. By letter dated May 18, 1987, DER notified Mr. Ramseyer that the application fee had not been received and, until received, the application had not been officially received. DER received the application fee on May 28, 1987. By letter dated June 25, 1987, DER informed Mr. Stearns, through his designated agent, Mr. Ramseyer, that the proposed project would require a permit under Chapter 403, Florida Statutes, and that his application was incomplete. Among other items requested were descriptions of water depths within a 300-foot radius of the proposed structure, shoreline structures within 100 feet of the proposed dock, and the boats intended to be moored at the facility. By letter dated July 10, 1987, Mr. Stearns provided DER with additional information. Submitting a new application, Mr. Stearns represented this time that the proposed use was private single dwelling, rather than private multi- dwelling, as previously indicated. He also stated that the adjoining landowners were Sunrise Landings Condominium. Again, he failed to complete the affidavit of ownership or control. A partial site plan of the condominium complex shows the dock as five feet north and 45 feet south of the next nearest docks at the complex. As he had on the February 22 application, Mr. Stearns certified as true that he knew that he had to obtain all required authorization prior to commencing construction, although construction had already been completed at this time. In fact, Mr. Stearns indicated on the application, as he did on the October 27 application described below, that construction was "proposed to commence" on June 22, 1987, and was "to be completed" on July 3, 1987. The application explains a four foot increase in the length of the dock as necessitated by "water depth." Elsewhere, the application states that the river had receded four inches since March, 1987. In justifying the construction of the dock in two sections, Mr. Stearns explained that the "shallow depth of the water . . . could result in possible environmental damage to the river bottom, if power boats were allowed to be moored in close proximatity [sic] to the area of the bulkhead line." Mr. Stearns described the boats that he proposed to moor at the dock. At maximum capacity, one boat has a draft of 10 inches, and the other has a draft of 14 inches. Attached to the application is a diagram showing maximum/minimum water depths. The depths are 13"/9" at the bulkhead, 19"/15" at 10', 21"/17" at 20', 23"/19" at 30 `, 25"/21" at 40', and 26"/22" at 50'. Mr. Stearns explained: In order to minimumize [sic] the possible environmental damage to the river bottom aquatic growth, it was necessary to place the power boat mooring section of the dock a minimum of 20 feet away from the bulkhead line. Another diagram shows water depths of 22" to 26" from 50 feet to 300 feet from the bulkhead to the north and south of the dock. 15. By letter dated June 17, 1987, which Mr. Stearns attached to the July 10 application, the Department of the Army issued him a general permit for the proposed project. The letter warns that "it appears that a permit from the Florida Department of Environmental Regulation may be required." The attached diagram shows a structure with a total length of 36 feet. By letter dated July 30, 1987, DER informed Mr. Stearns that, among other things, the affidavit of ownership or control was incomplete; discrepancies existed between the original application and the most recent application, such as with respect to the names of different adjoining landowners and different proposed uses from private multi-dwelling to private single dwelling; it was unclear whether all permits were received prior to dock construction; and it was unclear what portion of the deed entitled the applicant to place the dock in its proposed location. By letter dated October 27, 1987, Mr. Stearns provided DER with additional information and submitted a partial new application. He attested to the fact that he was the record owner of the property, although he failed to provide the required legal description. As to the question involving different adjoining property owners, Mr. Stearns indicated that he believed that because the dock was located more than 25 feet from the nearest living unit, the approval of other property owners was not required. He explained that the private single dwelling unit was a condominium unit in an eight-unit building. He advised that construction of the dock was completed on July 3, 1987. As to water depths, he showed a depth of 9 inches at the bulkhead and 26 inches at 500 feet. Additionally, he showed mean low water of 12 inches at 10 feet, 16 inches at 20 feet, 23 inches at 30 feet, and 26 inches at 40 feet. By letter dated December 8, 1987, DER informed Mr. Stearns that his application was deemed complete as of October 29, 1987. By Intent to Deny dated January 8, 1988, DER notified Mr. Stearns of its intent to deny his application for a permit. The notice states that the project is not exempt from permitting procedures. The notice acknowledges the presence of about 40 piers installed at the condominium complex without the appropriate permits. The notice states that water depths within visual distance of the shoreline are relatively shallow with scattered marine grass/algae clumps in the vicinity due to the shallow water. In this regard, the notice concludes: Installation of a pier in such shallow water, less than 24 inches deep, for permanent mooring of a small watercraft will probably cause localized disturbance of the benthic community by prop wash. This situation is already evident at several of the nonpermitted piers. Additionally, the Notice of Intent raised the issue of ownership or control. Citing an earlier final order, the notice states that "`the Department will not knowingly issue a permit for dredging and filling or other activities which would constitute a trespass on private property."' By Petition for Administrative Hearing filed January 19, 1988, Mr. Stearns requested an administrative hearing on the Intent to Deny his application for a permit. By letter dated January 27, 1988, assistant general counsel for DER confirmed a recent telephone conversation with Mr. Stearns and stated that, pursuant to that conversation I will hold your petition pending further action by the Department towards resolution of the situation. If it appears that an amicable resolution cannot be reached, I will forward the petition to the Division of Administrative Hearings for the assignment of a hearing officer. By Notice of Violation and Orders for Corrective Action dated December 19, 1988, DER notified Mr. and Mrs. Stearns and 101 other persons owning or having owned units at Sunrise Landing Condominiums that an investigation of the property on June 2, 1987, had disclosed that 43 docks had been installed and placed less than 65 feet apart with 75 boat slips. These docks had been constructed without permits. A meeting with unit owners on March 15, 1988, had not produced a resolution of the dispute. The Notice of Violation alleges that the docks extended up to 20 feet waterward of the bulkhead through water depths of 8-24 inches. The docks allegedly were constructed within an area conditionally approved by the Department of Natural Resources for shellfish harvesting, but without a Department variance. The docks allegedly resulted in damage to state waters and pollution through localized disturbance of the benthic community by associated boat traffic prop wash in shallow water. The adversely impacted submerged bottom allegedly is highly productive with scattered seagrasses providing valuable fishery resources for the Indian River. Lastly, DER alleges that it had incurred investigatory expenses of at least $1500. After reciting the statutes allegedly violated by the construction of the docks, the Notice of Violation demands, among other things, the removal of all of the docks. By Petition for Formal Proceeding filed January 12, 1989, Mr. and Mrs. Stearns requested a formal administrative hearing on the Notice of Violation. Pursuant to notice, DER held an informal conference with numerous owners of docks, including Mr. and Mrs. Stearns, on February 9, 1989. At the conclusion of the meeting, DER agreed to hold open the informal conference period for an additional 30 days to allow settlement negotiations to be concluded. By Amended Notice of Violation and Orders for Corrective Action dated March 23, 1989, DER issued another notice of violation against the ten remaining dock owners, including Mr. and Mrs. Stearns, who had not yet removed or agreed to remove their docks. The allegations are substantially identical to those of the original Notice of Violation. Because of the failure of settlement negotiations, DER transmitted both files involving the Stearns to the Division of Administrative Hearings on March 31, 1989. In several prior cases, DER had previously informed other unit owners seeking to build a dock off of the bulkhead adjoining the Common Element that no permit was required because the project was exempt under Section 403.813(2)(b), Florida Statutes. In March or April, 1987, DER changed its position on this point. The docks 45 feet north and 5 feet south of the Stearns' dock were constructed without a dredge and fill permit, apparently in reliance upon the same exemption to which the Stearns claim to be entitled in the subject cases. The operation of boats in the vicinity of the dock constructed by Mr. and Mrs. Stearns would stir up the submerged bottom and result in prop dredging of critical vegetation. In sum, the intended use of the dock would disrupt the benthic community. At times, the Stearns have been unable to reach their dock with their boats due to the shallowness of the water. The waters of the Indian River surrounding the Stearns' dock are Class III waters that the Department of Natural Resources has conditionally approved for shellfish harvesting. The Department of Natural Resources has not granted the Stearns a variance for the construction of the dock. The dock is less than 500 square feet of total coverage. The moorings from the dock five feet to the south of the subject dock remained in place following the removal of the remainder of the structure. At the time of the application, the Stearns dock, whose construction had begun no later than June 22, 1987, and been completed on July 3, 1987, was 45 feet south of the nearest dock to the north and 5 feet north of the nearest dock to the south. Both of these docks had been built under claims of exemption. The Stearns dock was maintained for the exclusive use of the Stearns and was not available to other unit owners. DER has failed to prove any investigatory expenses directly attributable to the Stearns, as opposed to the 103 unit owners in general. Moreover, given the pending applications, which disclosed most of the specifics of the subject dock, including inadequate water depths, no portion of the investigation could properly be attributed to the Stearns, especially when the sole witness for DER could not testify to any specific damage to submerged bottom and vegetation caused by boats using the Stearns' dock. Additionally, actual damage and the investigatory expenses attributable thereto are divisible and could have been attributed to a particular violator, but were not.

Recommendation Based on the foregoing, it is hereby RECOMMENDED that the Department of Environmental Regulation enter a Final Order denying the subject permit and ordering Mr. and Mrs. Stearns to remove their dock, upon such conditions as are necessary to avoid damage to the environment, but not imposing any administrative fine. ENTERED this 22nd day of February, 1990, in Tallahassee, Florida. ROBERT E. MEALE Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 22nd day of February, 1990. APPENDIX Treatment Accorded Proposed Findings of DER 1-11: adopted or adopted in substance. 12: adopted as to general shallowness and excessive shallowness with respect to the passage of boats. 13-15: adopted or adopted in substance. 16: rejected as irrelevant. 17-24: adopted. 25: rejected as recitation of testimony, unsupported by the greater weight of the evidence, and irrelevant. Treatment Accorded Proposed Findings of the Stearns 1-3: adopted or adopted in substance, except that last sentence of Paragraph 3 is rejected as subordinate. 4: adopted. 5: rejected as unsupported by the greater weight of the evidence. Placing a dock in water too shallow for safe boating may arguably constitute a navigational hazard. 6: adopted. 7: rejected as unsupported by the greater weight of the evidence. In the first place, the facts at the time of the application should control whether the project was, at the time of its actual construction, exempt from the permitting requirements. In addition, the evidence showed that the pilings of at least the closer dock remained in the water following the removal of the decking. 8: first two sentences adopted. Second sentence rejected as unsupported by the greater weight of the evidence. 9: [omitted.] 10: rejected as unsupported by the greater weight of the evidence. It is clear from the operative documents--namely, the warranty deed and declaration of condominium--that Mr. and Mrs. Stearns lack the legal right to use the Common Element in the manner that they have used it. A clause in an unrecorded contract, which probably does not survive closing, cannot diminish the rights of other Unit Owners in their undivided shares of the Common Element, which, in part, the Stearns have seized for their private use. 11: first paragraph adopted. Second paragraph rejected as irrelevant and unsupported by the greater weight of the evidence. COPIES FURNISHED: Dale H. Twachtmann Secretary Department of Environmental Regulation Twin Towers Office Building 2600 Blair Stone Road Tallahassee, FL 32399-2400 Daniel H. Thompson General Counsel Department of Environmental Regulation 2600 Blair Stone Road Tallahassee, FL 32399-2400 Steven A. Medina Assistant General Counsel Twin Towers Office Building 2600 Blair Stone Road Tallahassee, FL 32399-2400 Frank J Griffith, Jr. Cianfronga, Telfer & Reda 815 South Washington Avenue Titusville, FL 32780

Florida Laws (8) 120.57403.031403.087403.0876403.121403.141403.161403.813
# 10

Can't find what you're looking for?

Post a free question on our public forum.
Ask a Question
Search for lawyers by practice areas.
Find a Lawyer