Elawyers Elawyers
Washington| Change
Find Similar Cases by Filters
You can browse Case Laws by Courts, or by your need.
Find 49 similar cases
ROBERT W. DODT vs. DNR & NANNETTE K. SCOGGINS, 84-003997 (1984)
Division of Administrative Hearings, Florida Number: 84-003997 Latest Update: Sep. 11, 1985

Findings Of Fact Nannette K. Scoggins is the owner of the real property located at 5622 Gulf Drive, Holmes Beach, Florida in Manatee County. Nannette K. Scoggins' property, the petitioner's property, 5624 Gulf Drive, and the other adjacent property, 5620 Gulf Drive, are zoned as "A-1 Hotel-Motel" under the City of Holmes Beach Zoning Ordinance. On November 13, 1983, Mrs. Scoggins submitted to DNR an application for a permit for construction seaward of the coastal construction control line (control line). The proposed project, known as Jansea Place, would consist of two multifamily dwellings, four units to a building, divided by a swimming pool. A portion of the most seaward building would extend a maximum of 57 feet seaward of the control line. By letter dated July 11, 1984, DNR notified petitioner that the department was considering the permit application. The petitioner responded by letter dated July 18, 1984, objecting to any construction seaward of the control line. On October 1, 1984, petitioner received notification that DNR intended to recommend approval of the permit. The permit was scheduled for a vote by the Governor and Cabinet on October 16, 1984. The staff of DNR recommended approval of the permit. By telegram dated October 15, 1984, the petitioner requested an administrative hearing, and on October 22, 1984, petitioner filed a petition for a formal administrative hearing pursuant to Section 120.57(1), Florida Statutes. The application for permit No. ME-89 is a complete application for permit to construct seaward of the coastal construction control line. On October 5, 1983, the Superintendent of Public Works of the City of Holmes Beach certified that this project does not violate any ordinance of the City of Holmes Beach. The plans for the proposed project are signed and sealed by an architect registered in the State of Florida, and the submitted plans comply with the design standards established in Rule 16B-33.07, Florida Administrative Code to resist adequately the natural forces associated with a 100-year return interval storm event. The plans, specifications, drawings and other information submitted to DNR with the application for permit to construct seaward of the coastal construction control line are complete and accurate, and meet the requirements of DNR for that purpose. Under the provisions of Rule 16B-33, Florida Administrative Code, the application was determined to be complete on August 6, 1984. The proposed construction is located landward of an existing vertical concrete bulkhead. The seawall was built jointly by the Scoggins and Mr. McLean, who owns the property immediately to the south of the Scoggins' property. The seawall was built after the hurricane of 1972 because the existing dune system had been destroyed. Since that time, the mean high water line has continued to encroach landward to the point where it is now east of the wall. However, the seawall is not necessary for the protection of the proposed building. Although the seawall would fail under the direct impact of a major hurricane, the proposed building is adequately designed to withstand the impact erosion, the wave loads, the winds, and the water forces associated with a major hurricane. The necessity and justification for the project's location in relation to the control line is stated in the application, and petitioner has not challenged the necessity or justification. The City of Holmes Beach Zoning Ordinance requires that the buildings be separated by a minimum of 30 feet. Since the proposed buildings are separated by 30 feet, the proposed seaward building is located as far landward as possible without violating the zoning ordinance. Erosion and structural damage occurred as a result of Hurricane Agnes in 1972 and the "No Name" storm in 1982 in the area between 1,000 feet south of the Scoggins' property and 500 feet north of the Scoggins' property. Although the beach was fairly stable from 1974 to 1979, the beach began to erode in 1980. When the seawall was built in 1974, the dune line was even with the seawall. However, as can be seen from a comparison of the photographs taken in June of 1979 with those taken in early 1985, the beach has eroded since June of 1979 and the dune line is now several feet landward of the seawall. The DNR recommendation for approval of the Scoggin's permit application was based upon historical erosion data for the period between 1940 and 1974, which was the most recent data available that could be used to review the project. Mr. Clark stated that the application was recommended for approval based on the design of the proposed building and its alignment with existing structures built seaward of the control line. The proposed project is located landward of a line of existing structures. Although the adjacent properties have been affected by erosion, there was no evidence presented to show that the existing structures located seaward of the control line have been unduly affected by erosion. In 1974, when the seawall was being constructed, the worker building the seawall dug up part of the petitioner's property and destroyed the sea oats he had planted. However, the proposed project has a driveway encircling the building which would provide vehicular access to the seawall if necessary. The proposed project will partially obstruct petitioner's view to the southwest. However, there was no evidence presented that petitioner's property or the other adjacent property, would be adversely affected in any other way by the proposed project. There was no evidence presented that the proposed project would be affected by, or have an effect on, beach or coastal erosion. The proposed project would have no effect on the beach dune system.

Recommendation Upon consideration of the foregoing, it is recommended that DNR issue Permit Number ME-89 to Nannette K. Scoggins. DONE and ENTERED this 28th day of June, 1985, in Tallahassee Leon County Florida. DIANE A. GRUBBS Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 28th day of June, 1985.

Florida Laws (3) 120.57161.0536.04
# 1
CHARLES OSBORNE; BERNARD KNIGHT; AND MARY JO KNIGHT vs TOWN OF BEVERLY BEACH AND DEPARTMENT OF COMMUNITY AFFAIRS, 03-004758GM (2003)
Division of Administrative Hearings, Florida Filed:Bunnell, Florida Dec. 18, 2003 Number: 03-004758GM Latest Update: Nov. 07, 2005

The Issue The issue in the case is whether the Town of Beverly Beach's Comprehensive Plan Amendment 03-1, initially adopted by Ordinance 2003-ORD-6 and amended by Ordinance 2004-ORD-6, is "in compliance," as required by Section 163.3184, Florida Statutes (2004).

Findings Of Fact The Department is the state land planning agency and has authority to administer and enforce the Local Government Comprehensive Planning and Land Development Regulation Act, Chapter 163, Part II, Florida Statutes (2004). One of the Department's duties under the Act is to review proposed amendments to local government comprehensive plans to determine whether the amendments are in compliance with the Act. The Town of Beverly Beach is a small municipality in Flagler County, Florida, and has the duty and authority to adopt a local government comprehensive plan pursuant to Chapter 163, Florida Statutes (2004), and to amend the plan from time to time. In June 2002, the Town proposed to amend its Future Land Use Map (FLUM) to change some of the land uses within the 37-acre Shelter Cove Planned Unit Development (PUD). The Shelter Cove PUD was the subject of an earlier lawsuit in the circuit court for Flagler County brought by the owners and developers of the property after the Town denied their PUD application. In 2002, the court entered judgment against the Town and ordered the Town to approve the PUD application. In its order, the court included a statement that the Shelter Cove PUD was consistent with the Beverly Beach Comprehensive Plan. The purpose of the plan amendment proposed in June 2002 was to re-designate 14.25 acres from Conservation/Spoil Area to Low Density Residential, 0.75 acres of Conservation/Spoil Area to Medium Density Residential, and 8.25 acres of Low Density Residential to Medium Density Residential. The proposed amendment was transmitted to the Department for compliance review. In its July 2003 ORC Report, the Department set forth four objections to the proposed amendment: 1) increased density in a Coastal High Hazard Area; 2) no traffic impact analysis regarding emergency evacuation; 3) inadequate potable water and sanitary sewer services; and 4) unsuitability for development because of saltwater marsh and potential use by threatened and endangered animal species. The Town made changes to the proposed amendment to address the Department's objections and adopted Plan Amendment 03-1 on October 6, 2003. One significant change made by the Town was to reduce the size of the land affected by the amendment from 23.25 acres to 14.5 acres. The stated purpose of the revised amendment was to deal exclusively with the spoil areas within the Shelter Cove PUD; to convert them from Conservation to Low Density Residential. The Department was not satisfied with the changes made by the Town and on November 17, 2003, it issued a Statement of Intent To Find The Comprehensive Plan Amendment Not In Compliance. This statement did not reassert the four objections of the ORC Report, but identified only two reasons for its determination that Plan Amendment 03-1 was not in compliance: 1) increased density in a Coastal High Hazard Area that would increase evacuation clearance times and 2) inadequate sanitary sewer facilities based on the denial of the utility's permit renewal by the Department of Environmental Protection (DEP). The Department recommended remedial actions that would bring Plan Amendment 03-1 into compliance. Thereafter, the Department and Town entered into a compliance agreement to identify remedial actions by the Town that would bring the plan amendment into compliance. Pursuant to the agreement, the Town adopted remedial measures in Ordinance 2004-ORD-6 (the Remedial Ordinance) that caused the Department to determine that the plan amendment was in compliance. The Remedial Ordinance (with additions and deletions as indicated in the ordinance) states in pertinent part: Limiting Density on the 14.5-acre amendment site & Hurricane Evacuation Plan Future Land Use Element: contains policies controlling the density and intensity of development (both residential and non- residential) in the Town of Beverly Beach. Policy A.1.1.9 The Low Density Residential (LDR) land use (up to 5 dwelling units/acre) shall be applied to 14.5 acres of upland spoil sites in the Shelter Cove development as shown in Exhibit A, not to exceed a total gross density of 28 residential units. In addition to the provisions described in Policy 1.1.4, the following provisions shall apply to the Shelter Cove Development: Residential land use for the Shelter Cove Planned Unit Development(PUD)shall be limited to a maximum of 115 dwelling units. The Town of Beverly Beach shall not issue a permit or certificate of occupancy until the Building Official certifies the required public facilities and services will be provided consistent with Chapter 9J-5, Florida Administrative Code (see Policy A.1.1.1). * * * Policy A.1.1.10 No later than December 2005, Beverly Beach shall revise its comprehensive plan to update the goals, objectives and policies and future land use map series and transmit such revisions to the Department of Community Affairs. The updated plan shall reflect changes to Chapter 163, Florida Statutes, and Rule 9J-5, Florida Administrative Code, since the plan went into effect in 1991. This revision shall be based on a planning period through Year 2015, with current and forecasted conditions and satisfy data and analysis requirements. * * * Revise policies under Objective D.2.1, Beverly Beach Comprehensive Plan regarding the provision of potable water and sanitary sewer Public Infrastructure/Facilities Element: refers to the protection of water quality by specific policies that require deficiencies in wastewater treatment facilities be corrected in accordance with DEP requirements. Objective D.2.1 By December 31, 1992 December 31, 2005, the Town shall require that existing deficiencies in the wastewater treatment package plants owned by Surfside Utilities operated by Ocean City Utilities be corrected in accordance with FDER Department of Environmental Protection [DEP] requirements. Policy D.2.1.1 As the Town does not own the wastewater treatment plants nor has operational control over the same, the Town shall formalize a coordination committee to include the owner/operator of Surfside Utilities Ocean City Utilities, the members of the Town Commission, members of the Flagler County Board of County Commissioners or their appointee, members of the City of Flagler Beach Commission or their appointee, and FDER the Department of Environmental Protection [DEP] and any other identified stakeholder in the Town. Policy D.2.1.2 The Town shall use the coordination committee to address the deficiencies in the wastewater plants, to set priorities for upgrading and replacing components of the plants, and to request FDER the Department of Environmental Protection [DEP]to increase and enforce their regulations requiring periodic monitoring and maintenance of package treatment plants. Policy D.1.2.3 The Town shall use the coordination committee to investigate the feasibility of assuming operational responsibility of the wastewater treatment system by another entity. Applying the five dwelling units per acre density allowed in the Low Density Residential category to 14.5 acres would generate 72.5 units. However, as indicated above, the Remedial Ordinance also restricted the total allowable dwelling units in the 14.5 acres to 28 units. The 28 units coincide with the site plan for the Shelter Cove PUD that was the subject of the circuit court judgment. The site plan called for 28 single- family lots in the former spoil areas. Charles Osbourne, Bernard Knight, and Mary Jo Knight were residents of the Town of Beverly Beach when the Town adopted Plan Amendment 03-1. They intervened against the Town in the original proceedings initiated by the Department. Following the Department's determination that the plan amendment had been brought into compliance by the Remedial Ordinance, they filed an Amended Petition to Intervene and were realigned as the Petitioners. On some date between the filing of their original petition in this case and the date of the final hearing, Petitioners Bernard Knight and Mary Jo Knight moved out of Beverly Beach. They are no longer residents of the Town. In their Amended Petition to Intervene, the Petitioners assert that the Remedial Ordinance did not resolve all the problems originally identified by the Department's ORC Report, and Plan Amendment 03-1 is still not in compliance. The Petitioners' objections to the amendment fall into three categories: insufficient and inaccurate data and analysis, insufficient legal description for the lands affected by the plan amendment, and inadequate wastewater services available for the increased density resulting from the amendment. These three categories will be used to organize the findings of fact that follow. Data and Analysis/Maps The Petitioners assert that the maps used for Plan Amendment 03-1 and the Remedial Amendment are not the official maps currently contained in the Beverly Beach Comprehensive Plan. They contend the unofficial maps contained errors that caused some of the area designated as Conservation/Saltwater Marsh to be included in the 14.5 acres re-designated Low Density Residential. At the hearing, the Petitioners also attempted to show that maps used by the Town with Plan Amendment 03-1 were not consistent with the Beverly Beach FLUM with regard to the depiction of saltwater marsh areas outside the 14.5 acres affected by the plan amendment. Whether such discrepancies exist is not a relevant inquiry for determining whether Plan Amendment 03-1 is in compliance. A 1997 report regarding threatened and endangered animal species, prepared by Lotspeich and Associates for the developer of the Shelter Cove PUD, includes a statement that there are 10.3 acres of spoil on the 37-acre PUD site. That figure is inconsistent with the Town's claim that the lands affected by Plan Amendment 03-1 consist of 14.5 acres of spoil. Lindsay Haga, a regional planner with the Northeast Florida Regional Planning Council (Council), made the determination that there are 14.5 acres of spoil area. Because the Town does not have a professional planning staff, the Council was providing planning services to the Town under contract. Ms. Haga worked on Plan Amendment 03-1 on behalf of the Town. Ms. Haga obtained a mapping of the land uses within the Shelter Cove PUD from information maintained by the St. Johns River Water Management District (District). The land use categories are based on the Future Land Use Classification Categorization System, and were applied by the District using aerial photography. Using professional software called "ArcView," Ms. Haga derived the size of the various land uses mapped within the Shelter Cove PUD by the District. The software calculated the size of the spoil areas as 14.5 acres. According to Ms. Haga, planners use this method "100 percent" of the time to delineate land uses on future land use maps. Ms. Haga was called as a witness by the Petitioners and by Beverly Beach and testified at length on direct and cross-examination on how she determined the size of the spoil areas. Nevertheless, some ambiguity remains as to whether the size and position of the spoil areas designated in the official Town FLUM are the same as their size and position as delineated by Ms. Haga for Plan Amendment 03-1 using information from the St Johns River Water Management District. The Town and the Department seem to suggest in their joint post-hearing submittal that the size and position of the spoil areas on the FLUM can be "cleaned up" or re-drawn using more site-specific information presented at the final hearing. The implication is that, if the Town's FLUM delineated less than 14.5 acres as Conservation/Spoil Area, but better data is presented at the hearing to show that the spoil areas actually cover 14.5 acres, the FLUM delineation can be ignored or treated as if did cover 14.5 acres. The redrawing of land uses as they are depicted on an adopted FLUM is arguably beyond the authority granted to the Department in Chapter 163. That issue need not be decided on this record, however, because the more credible and persuasive evidence shows there were no material changes to the size and position of the spoil areas in Plan Amendment 03-1, and no saltwater marsh was re-designated as Low Density Residential. Data and Analysis/Topographic Information The Petitioners assert that topographic data used by the Town was flawed and did not accurately reflect that much of the Shelter Cove PUD is within the 100-year floodplain. For example, the June 2002 Transmittal Packet sent to the Department included a statement that, "According to FEMA the 100 year floodplain is confined to the saltwater marsh areas located adjacent to the Intracoastal Waterway." At the hearing, the Town admitted that some of topographic information was inaccurate and described it as a "scrivener's error." The parties stipulated to the introduction into evidence of topographic information that indicates a portion of the 14.5 acres affected by Plan Amendment 03-1 lies within the 100-year floodplain. The Petitioners have not shown how the inclusion of inaccurate topographic in the data and analysis causes Plan Amendment 03-1 to be not in compliance; or, put another way, the Petitioners have not shown how the accurate topographic information proves Plan Amendment 03-1 will be inconsistent with the Beverly Beach Comprehensive Plan or applicable state laws and regulations. The Beverly Beach Comprehensive Plan does not prohibit Low Density Residential uses in the 100-year floodplain. Data and Analysis/Clustering The Petitioners contend that the data and analysis was flawed because it included a reference to the possibility of clustering dwelling units to avoid adverse impacts to areas unsuitable for development, but the Town has no regulations that allow for or address clustering. Neither the Amended Petition to Intervene nor the evidence presented by the Petitioners makes clear how this alleged error causes Plan Amendment 03-1 to be not in compliance. Any alleged error must relate to the 14.5 acres affected by the amendment. The Petitioners did not show that clustering of dwelling units is planned or necessary on the 14.5 acres. Data and Analysis/Scrub Jays The Petitioners contend that the data and analysis is insufficient because it fails to describe and account for the current use of the site by the Florida scrub jay, a bird listed as threatened by the Florida Fish and Wildlife Conservation Commission and the United States Fish and Wildlife Service. The Town and Department stipulated that scrub jays have been seen on the property. Charles Osbourne and Gail Duggins, a birdwatcher, testified that they have seen scrub jays in the Shelter Cove PUD area on several occasions. They marked Petitioners' Exhibit 15 to indicate eight specific sites within the PUD where they had observed scrub jays. None of the marked sites are located on the 14.5 acres affected by Plan Amendment 03-1. Lotspeich and Associates conducted a scrub jay survey on the 37-acre Shelter Cove PUD in 1997. They observed no scrub jays on the 14.5 acres that will be affected by Plan Amendment 03-1. In the written report of the survey, Lotspeich and Associates concluded that, "no jays reside on-site nor did any birds react as though they were defending territory which extended onto the property." Following a second survey in 2002, Lotspeich and Associates reached the same conclusion that the property "is unlikely to support a resident Florida scrub jay population." The observations of scrub jays made by Mr. Osbourne and Ms. Duggins do not contradict the conclusions of the Lotspeich and Associates reports. Mr. Osbourne and Ms. Duggins did not offer an opinion (and no foundation was laid for their competence to offer such an opinion) that scrub jays reside on the 14.5 acres affected by Plan Amendment 03-1. The Department's ORC Report stated that the originally-proposed amendment was not consistent with Policy E 1.4.3 of the Town's comprehensive plan which calls for the Town to obtain information from appropriate agencies concerning the known locations of listed plant and animal species. The Department recommended in the ORC Report that the Town conduct a survey for gopher tortoises and other listed species. The Department's objection about listed species, however, was not included its subsequent Statement of Intent to Find The Comprehensive Plan Amendment Not in Compliance. The Town had available to it, as part of the data and analysis to support Plan Amendment 03-1 and the Remedial Amendment, the Lotspeich and Associates reports prepared for the United States Fish and Wildlife Service. The reports convey the results of Lotspeich and Associates' surveys of the Shelter Cove PUD property for gopher tortoises, scrub jays and other listed species. It is likely to be the best information available since it is a site-specific, scientific study. The Petitioners did not show that better data were available or that the Lotspeich and Associates reports are flawed. In fact, the Lotspeich and Associates reports were exhibits offered by the Petitioners. Policy E.1.4.3 of the Beverly Beach Comprehensive Plan directs the Town to adopt land development regulations that provide protections for known listed species. Land development regulations are the usual and appropriate tools for applying specific protective measures to specific development proposals. No regulations have yet been adopted by the Town to protect listed species. Listed species are not left unprotected from development activities in the Town, however, since there are both state and federal laws to protect listed species and their habitats. Data and Analysis/Beach Access The Petitioners contend that the data and analysis was insufficient because it indicated that there are five locations in the Town where the public can gain access to the beach, but the Petitioners allege there are only two public beach walkovers that qualify under the Beverly Beach Comprehensive Plan. The beach access issue relates to the Town's recreational level of service standard adopted in the Recreation and Open Space Element of the Beverly Beach Comprehensive Plan. Policy F.1.1.1 specifies that the adopted level of service standard is "Five publicly-owned beach access facilities." The Petitioners apparently believe that the easements acquired by the Town that provide for public beach access across private property do not qualify as publicly-owned beach access facilities as contemplated by the Beverly Beach Comprehensive Plan. The term "publicly-owned beach access facilities" is not defined in the Recreation and Open Space Element, but one can find a statement at page F-2 that, "Access points and parking areas are support facilities for public owned beaches." Therefore, the Town considers an access point, without any man- made structures, to be a "facility." Furthermore, the comprehensive plan, itself, includes a map that depicts the location of the five public beach access points. It must be assumed that these access points met the Town's intent and meaning. By raising the issue of whether the data and analysis for Plan Amendment 03-1 is accurate in referring to the existence of five public beach access points, the Petitioners are collaterally attacking the existing comprehensive plan. Stephen Emmett, the mayor of Beverly Beach, stated that the five public beach access points depicted in the Beverly Beach Comprehensive Plan, as well as a new sixth beach access point, are currently maintained by the Town. Description of the Land Affected The Petitioners alleged in their Amended Petition to Intervene that the Town did not have an adequate legal description for the lands affected by the plan amendment. The issue was not raised in the Petitioners' Pre-Hearing Statement. When the Department objected to the Petitioners' presentation of evidence on this issue because it was not raised in their Pre- Hearing Statement, the Petitioners voluntarily withdrew the issue. Sanitary Sewer Services The Petitioners contend that sanitary sewer services are not adequate for the increased residential density that would result from Plan Amendment 03-1. The Beverly Beach Wastewater Treatment Facility is operated by Ocean City Utilities. Ocean City's application to renew the permit for the facility was denied by DEP in September 2003 because the facility was not in compliance with several DEP regulations. As a result of the denial of Ocean City's permit renewal application, DEP would not allow new customers to connect to the Beverly Beach Wastewater Treatment Facility, including the Shelter Cove PUD. DEP subsequently approved the connection of the Shelter Cove PUD wastewater collection system to the Beverly Beach Wastewater Treatment Facility. Permitting problems associated with the treatment plant was one reason for the Department's objection to the originally proposed plan amendment and the Department's subsequent determination that Plan Amendment 03-1 was not in compliance. No evidence was presented to show that Ocean City Utilities has corrected the deficiencies in the wastewater treatment plant or has obtained a renewal permit from DEP. Nevertheless, the Department determined that Plan Amendment 03-1 is in compliance based on the changes to the Beverly Beach Comprehensive Plan called for in the compliance agreement and adopted in the Remedial Ordinance. Objective D.2.1 of the Beverly Beach Comprehensive Plan was amended to require that existing deficiencies in the wastewater treatment plant be corrected by December 31, 2005. Policies D.2.1.1, D.2.1.2, D.2.1.3 were amended to re-constitute and re-energize a coordination committee to address the deficiencies in the wastewater plant and the feasibility of giving operational responsibility to another entity (such as Flagler County). In addition, the Remedial Ordinance amended Policy A.1.19 of the Beverly Beach Comprehensive Plan to prohibit the Town from issuing a permit or certificate of occupancy for the Shelter Cove PUD "until the Building Official certifies the required public facilities and services will be provided consistent with Chapter 9J-5, Florida Administrative Code." No dispute was raised about the available capacity of the Beverly Beach Wastewater Treatment Facility to serve the Shelter Cove PUD.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Community Affairs enter a final order determining that the Town of Beverly Beach Plan Amendment 03-1, and Remedial Ordinance 2004-ORD-6, are "in compliance" as defined in Chapter 163, Part II, Florida Statutes (2004). DONE AND ENTERED this 29th day of August, 2005, in Tallahassee, Leon County, Florida. S BRAM D. E. CANTER Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 29th day of August, 2005. COPIES FURNISHED: Shaw P. Stiller, Esquire Department of Community Affairs 2555 Shumard Oak Boulevard Tallahassee, Florida 32399-2100 Sidney F. Ansbacher, Esquire Upchurch, Bailey and Upchurch, P.A. Post Office Box 3007 St. Augustine, Florida 32085-3007 Robert J. Riggio, Esquire Riggio & Mitchell, P.A. 400 South Palmetto Avenue Daytona Beach, Florida 32114 Thaddeus Cohen, Secretary Department of Community Affairs 2555 Shumard Oak Boulevard, Suite 100 Tallahassee, Florida 32399-2100 Heidi Hughes, General Counsel Department of Community Affairs 2555 Shumard Oak Boulevard, Suite 325 Tallahassee, Florida 32399-2100

Florida Laws (9) 120.569163.3177163.3178163.3180163.3184163.3191163.3245187.20157.105
# 2
JACK G. NICHOLS vs. DEPARTMENT OF NATURAL RESOURCES, 84-002945 (1984)
Division of Administrative Hearings, Florida Number: 84-002945 Latest Update: Sep. 25, 1985

Findings Of Fact The Petitioner, Dr. Jack G. Nichols, is a resident of the State of Illinois. He and his parents have, for many years, owned property on Dog island, a barrier island in Franklin County, Florida. Dr. Nichols owns Lots 107 and 108 on Dog Island, and has for many years entertained plans of building a beach house on each lot, consisting of a single-family residence for himself on Lot 108 and such a house on Lot 107 for his parents. Dr. Nichols has the habit of visiting Dog island to inspect his property on his vacations and has done so from time to time prior to April, 1984. Over the years he conceived of the general type of house he wished to build and determined prior to April, 1984 to locate the houses landward of the then-existing Coastal Construction Control Line. Pursuant to Chapter 161, Florida Statutes, the Department of Natural Resources undertook to survey and delineate a new Coastal Construction Control Line for Franklin County. The location of that line is described in Rule 16B- 26.14, F.A.C. and the new jurisdictional line became effective on April 30, 1984. Dr. Nichols came to Dog Island for his vacation in April, 1984, at which time he learned for the first time that the Department of Natural Resources had adopted the new Coastal Construction Control Line. After hearing of this new jurisdictional boundary from other property owners on the island, he sought to determine how that newly-defined boundary would affect his property and his plans for constructing a beach house. He observed aerial photographs depicting the Coastal Construction Control Line which would take effect April 30, 1984. He determined that the sites he had selected for the houses on his lots would be seaward of the new control line, as opposed to the preexisting line which he had taken into account in selecting his original home site. He also learned that if the houses he envisioned were under construction upon the effective date of the new Coastal Construction Control Line then he would be able to proceed with their construction without having to obtain a permit from the Department of Natural Resources. The Petitioner had not originally intended to construct the houses on his lots as early as April, 1984, but he became concerned that if he did not commence construction prior to the effective date of the new control line, he would not be able to place the houses at the location he had previously planned for. Thus, he took steps to retain a contractor and commence construction immediately. The Petitioner contacted Mr. William A. Shults, a contractor with experience building in the coastal areas of Franklin County. Mr. Shults was available and able to undertake construction activities and the two parties entered into a contract calling for construction of a beach house for both lots on approximately April 20, 1984. Mr. Shults immediately had necessary engineering work accomplished, had plans drafted for the structures and retained a construction crew. He cleared sufficient area on both lots to accommodate the residences and thereafter, on April 26, obtained a building permit for the structures. Materials were delivered to the island by landing craft on April 26 and 27, 1984. Mr. Shults also had a truck equipped with an auger or drilling equipment transported to the island and placed on the job site on or before April 27, 1984. The plans called for construction of the houses with a piling or pole foundation, so that the houses would be constructed above the specified flood levels. The poles and other materials necessary for construction of the foundation had all been delivered by April 27, 1984. The foundation lines were marked, the corner "batter boards" placed and other minor site preparation accomplished. The holes for the piling were to have been drilled on Saturday, April 28 but the trucks with the auger machine aboard, suffered a broken axle prior to its being positioned on Dr. Nichols' lots so that it was impossible to get the auger machine to the lots on April 28 or 29. Mr. Shults and his crew attempted to pull the truck to the site, but the difficulty of the terrain rendered that impossible. There was one other piece of auger equipment on the island, but its owner was engaged in construction activity with it at the time. That person agreed to bring his machine to the site on April 29 and begin augering and placing the poles for the pilings. His work became behind schedule however, and his machine was still involved in construction activity at his own site and could not be brought to Petitioner's site on that day. Mr. Shults, upon learning that the augering machine would not be available when needed, began commencing hand-digging of the pilings with post hole diggers on April 29. This method was a slow and laborious process because the holes had to be excavated much deeper than the length of the post-hole diggers. As a result, when the hole was dug as deep as the post-hole digger could reach from the surface of the ground, a hole had to be dug alongside the piling foundation hole so that a crew member could stand down in that hole and thus dig the piling hole deeper, handing the post-hole diggers with each load of dirt up to another crew member on the surface to dump, who would then hand the post-hole diggers back to the lower-placed crew member. This made the process of digging the foundation piling holes much slower than the use of the auger equipment. In this manner, however, Shults succeeded in digging four foundation holes on Lot 105. At that point, the augering machine arrived on the site and four piling holes were dug and the pertinent poles placed in them on Lot 107 as well. Throughout this construction process, Mr. Shults' crew was working on both foundations at one time. This allowed for less costly construction due to the efficiency of undertaking the same kind of work on two structures with the same crew at the same time. Since the two lots and construction sites adjoined each other, one crew could efficiently be used for both construction sites in an economic fashion. On April 30, Shults' construction crew proceeded to work on the structure on Lot 108 to further secure and place foundation posts. The four pilings placed in the holes on Lot 107 the day before remained in place. The construction crew and most of its equipment, and most construction work, was proceeding on Lot 108 merely because of the order of Mr. Shults to his crew to finish placing the foundation posts on that lot first, on that day. During the morning of that day, representatives of the Department arrived on the site and advised Mr. Shults that the construction activities appeared to be illegal and seaward of the Coastal Construction Control Line. They advised him that any further activity of that type would be undertaken at his and the lot owner's risk and expense. Mr. Shults thus ceased activities on both lots for a time, but during the following week, after discussing the dispute with certain Department employees, arrived at the opinion that the owner's construction activities had achieved grandfather status and that no permit from the Department would be required. He thus undertook to finish placing the foundation pilings on both lots. All the foundation pilings were installed on both lots by the end of the second week of May, 1984. Mr. Shults then contacted Dr. Nichols by telephone in Illinois informing him about the progress of the job, including the height of the piling. During this conversation Dr. Nichols became concerned that the pilings on Lot 107 did not project above the surface of the ground as far as he had anticipated, thus obstructing his view of the Gulf of Mexico from the beach house which would be constructed on top of the pilings. The view would be obstructed by the existing sand dune which Dr. Nichols had not wanted to disturb, hence locating his house in the more landward position at issue. In order to provide the desired view of the Gulf over the intervening sand dune, Dr. Nichols instructed Mr. Shults to replace the existing pilings on Lot 107 with longer ones. Mr. Shults purchased new pilings, had them delivered to the site, removed the original poles and installed the new ones in their place in the same holes, including the four holes that were dug prior to the effective date of the Coastal Construction Control Line. Dr. Nichols and Mr. Shults established that the original poles had been placed with the intention that they would be the permanent foundation for the house and no decision was contemplated nor made concerning their removal and replacement with the longer poles until after the foundation was fully constructed. In any event, by its letter of May 21, 1984, advising Dr. Nichols of the alleged violation of the Coastal Construction Control Line, the Department made a "free-form" determination that the construction activities on Lot 107 before April 30, 1984, were not sufficient to confer "grandfathered" status and that the activities were illegal unless a permit was obtained. The subject petition was filed and this proceeding ensued. It is true that Dr. Nichols' original intent was not to commence construction of the beach houses as soon as he did in April, 1984 and that he only began construction at that earlier time when he learned of the impending effective date of the new Coastal Construction Control Line which would require him to obtain a permit before constructing the houses at the sites he had previously selected. However, it is equally true that Dr. Nichols' bona fide intention when he retained Mr. Shults to commence construction was to not merely clear the site and place pilings and then construct the houses at some indefinite later time, but rather to commence construction and pursue construction activities on an ongoing, uninterrupted basis through to completion of both houses on both lots. If the Department had not intervened with its letter to the effect that the Petitioner might be in violation of the Coastal Construction Control Line, construction activities on Lot 107 would have continued to completion in an uninterrupted fashion. Prior to the effective date of the Department's Coastal Construction Control Line, the Petitioner's construction activity, involving the excavation for and placing of the foundation pilings for the residence to be on Lot 107, was undertaken and engaged in a continuous, uninterrupted fashion. The decision to remove the original pilings and replace them with longer poles was not envisioned, intended or made prior to the completion of the entire pole foundation for the house on Lot 107 in the first or second week of May. It was only at this time, when the poles were all installed, that it was determined by the owner and Mr. Shults that the original pilings were not long enough to confer a sufficient view of the Gulf from the house to be constructed on top of them. Thus, the removal of the original pilings and the replacement of them with longer poles in the same holes the original pilings had been installed in, was not an interruption in the construction activities, but was rather the correction of a deficiency in the original materials. This replacement did not involve an alteration or modification of the design, extent and type of materials of the original foundation (except to the immaterial extent that the replacement poles were round instead of square). In short, the construction activity undertaken after April 20, 1984 was a good faith effort to commence construction on the house on Lot 107 and continue it to completion in an uninterrupted fashion. The parties, Dr. Nichols and Mr. Shults, intended from the beginning to use the poles first placed in that foundation as the ultimate foundation for the structure, and did not intend merely placing those original poles, which were later removed, as a subterfuge to obtain a grandfathered status for the construction activity. The construction was landward of the Coastal Construction Control Line as it existed prior to April 30, 1984.

Recommendation Having considered the foregoing Findings of Fact, Conclusions of Law, the evidence of record, the candor and demeanor of the witnesses and the pleadings and arguments of the parties, it is, therefore RECOMMENDED: That the Department of Natural Resources enter a Final Order determining that the structure on Lot 107, Dog Island, Franklin County, Florida is not in violation of the Department of Natural Resources permitting authority. DONE and ENTERED this 25th day of September, 1985 in Tallahassee, Florida. P. MICHAEL RUFF Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 25th day of September, 1985.

Florida Laws (3) 120.57161.052161.053
# 4
AMERICAN COASTAL ENGINEERING, INC., ON BEHALF OF WILLIS H. DUPONT vs DEPARTMENT OF NATURAL RESOURCES, 91-005417 (1991)
Division of Administrative Hearings, Florida Filed:West Palm Beach, Florida Aug. 28, 1991 Number: 91-005417 Latest Update: Jan. 03, 1995

The Issue The issues for determination at final hearing were (1) whether Petitioner's coastal construction Permit No. 86-155PB, authorizing Petitioner to construct and temporarily maintain an experimental reef structure seaward of the DuPont residence in West Palm Beach, Palm Beach County, Florida, should be extended under Special Permit Condition 10 of the Permit and (2) whether the experimental reef structure should be removed pursuant to Special Permit Conditions 3 and 12 of the Permit.

Findings Of Fact On April 6, 1987, American Coastal Engineering, on behalf of Willis H. DuPont (Petitioner) and Florida Atlantic University's Department of Ocean Engineering, was granted coastal construction Permit NO. 86-155PB 3/ (Permit) by the Department of Natural Resources (Respondent). 4/ The Permit authorized Petitioner to construct and temporarily maintain an experimental reef structure seaward of the DuPont residence in West Palm Beach, Florida. The experimental reef structure, referred to as a prefabricated erosion prevention reef (PEP reef), is a 550 foot submerged breakwater which was constructed using prefabricated concrete segments, placed end-to-end underwater in the nearshore area. The purpose of the PEP reef is to reduce erosion of the beach landward of the structure. The PEP reef was installed on May 5, 1988. Special conditions were placed on the Permit, to which Petitioner agreed. The special conditions in pertinent part provide: The permittee shall adjust, alter or remove any structure or other physical evidence of the work or activity permitted, as directed by the Executive Director, if in the opinion of the Executive Director, the structure, work or activity in question results in damage to surrounding property or otherwise proves to be undersirable or becomes unnecessary. Adjustment, alteration, or removal required under this provision, shall be accomplished by the permittee at no cost to the State of Florida. * * * 10. The proposed submerged breakwater shall be removed within two years following installation of the experimental structure unless determined by the staff to remain in place for an extended period of time. This determination shall be based on a staff evaluation of the monitoring data, existing statutory regulations, and the feasibility of the project in concurrence with the beach management plan at that time. The experimental structure shall only remain in place after two years upon written approval from the Executive Director indicating an extension has been granted. * * * 12. The Executive Director may order removal of the experimental structure as soon as the shoreline along any portion of the area required to be nourished under Special Permit Condition 6 erodes up to or landward of the pre-nourished beach profile indicating a complete loss of the nourished beach material from that location and accretion at another location within the area to be monitored. Petitioner requested an extension of the Permit. On July 10, 1991, Respondent issued a final order denying an extension of the Permit, pursuant to Special Permit Condition 10, and directing the Petitioner to remove the PEP reef pursuant to Special Permit Conditions 3 and 12. An extension of the Permit beyond the two years following installation of the PEP reef, according to Special Permit Condition 10, is based upon three factors: (1) an evaluation by Respondent's staff of monitoring data gathered by Petitioner, (2) statutory regulations existing at the time of the extension request, and (3) the feasibility of the project in concurrence with the beach management plan existing at the time of the extension request. Although Petitioner's monitoring data addressed the question whether the PEP reef was performing its function, it did not address existing statutory regulations or the project's feasibility in concurrence with the current beach management plan. 5/ Petitioner's monitoring data was collected over a two-year period with surveys being performed through March 1990: March 1988 (preconstruction), May 1988 (post-construction), August 1988, December 1988, February 1989, April 1989, July 1989, November 1989, and March 1990. The data was collected along 17 profile stations: seven stations were located within or immediately adjacent to the boundaries of the PEP reef, and five to the north and five to the south of the PEP reef. The data indicated that the PEP reef was an experiment and approved by Respondent as an experiment. As a conclusion, Petitioner indicates that the PEP reef is functioning for the purpose it was designed in that it is providing a benefit to the beach. Respondent disagreed with Petitioner's conclusion. For one, Respondent disagreed with the method of analysis used by Petitioner to analyze the data because Petitioner's analysis failed to filter out seasonal effects. This procedure brought into play the first of the three factors in Special Permit Condition 10 which was used for denial of the Permit extension. Petitioner's monitoring data was utilized and analyzed by Respondent. Using the data gathered, Respondent created profile plots which are cross sectional depictions of the shoreline profiles and which displayed changes to the shoreline occurring during the survey period. Respondent used a shoreline change analysis in determining the PEP reef's effect on the shoreline in its vicinity. The analysis focused on the net change in the shoreline, i.e., the net change in the location of the mean high water line, factoring out the seasonal variations which occur along the coast by comparing profile plots from the same time of year taken during the two-year monitoring period. The shoreline change analysis indicated that in the vicinity of the PEP reef the shoreline showed irregular periods of both accretion and erosion. However, the shoreline did not reflect the typical pattern that was expected with a functioning breakwater. To the contrary, the irregular periods of accretion and erosion and the irregular configuration of the shoreline indicated that factors other than the PEP reef were affecting the shoreline. One such intervening factor was attributed to the large number of existing shoreline structures called groins which are scattered throughout the area. Groins are structures intended to stabilize the shoreline by blocking the down drift movement of sand, thereby altering the natural coastal processes. The monitoring data shows that, in terms of accretion or erosion, the PEP reef produced no recognizable influence on the shoreline in its vicinity. As to the second factor in Special Permit Condition 10, at the time the Permit was granted in 1988, no regulations specifically applicable to experimental structures existed. However, in 1989 a provision specifically addressing the permitting of experimental structures became law. /6 The provision provides that the "intent" of the Florida Legislature is to "encourage the development of new and innovative methods for dealing with the coastal shoreline erosion problem," and that, in authorizing the "construction of pilot projects using alternative coastal shoreline erosion control methods," the Respondent must determine, among other things, that "the proposed project site is properly suited for analysis of the results of the proposed activity." Groins in the PEP reef area alter the natural coastal processes and, therefore, play a significant role in the analysis of the shoreline processes. The effect of the groins affected the Respondent's ability to determine the effectiveness of the experimental structure. As a result, the Respondent was unable to make a determination in accordance with the legislative mandate. As to the third factor in Special Permit Condition 10, Petitioner presented no evidence addressing this factor. Petitioner has failed to show that the experimental structure, the PEP reef, has satisfied Special Permit Condition 10. It has failed to show that the intended purpose of the PEP reef has been accomplished, i.e., that the PEP reef is effective or beneficial. In denying Petitioner's request for an extension of the Permit, Respondent directed removal of the PEP reef pursuant to Special Permit Conditions 3 and 12. Special Permit Condition 3 provides for removal, alteration or adjustment of the PEP reef if it "proves to be undersirable or becomes unnecessary." The construction of the PEP reef consisted of, among other things, the placing of individual reef units end-to-end. To alert boaters to the location of the PEP reef, a buoy was placed at each end of the structure. The stability of the PEP reef is questionable. In 1989 a storm dislodged the individual units. In an effort to prevent sliding, Petitioner attempted to realign the units to their original position and added more weight to the units. Despite Petitioner's efforts to stabilize the structure, the PEP reef has experienced continued movement. Furthermore, because of the continued movement, boaters' safety would be compromised in that the buoys would be ineffective in warning them of the location of any units which may be dislodged. Also, the additional weight to the units could cause the individual units to settle, potentially affecting the performance of the PEP reef, and could induce erosional scour around the structure itself. Special Permit Condition 12 provides for removal when "the shoreline along any portion of the area required to be nourished . . . erodes up to or landward of the pre-nourished beach profile indicating a complete loss of the nourished beach material from that location and accretion at another location." The shoreline analysis showed that the shoreline in many portions of the nourished area eroded landward of the pre-nourished beach profile. The mean high water line had positioned landward of its pre-project location. Petitioner has failed to show that the PEP reef does not fall within the conditions of Special Permit Conditions 3 and 12. Federally protected and endangered marine species have attached themselves to and/or now reside in the PEP reef, complicating the removal of the PEP reef. In order not to disturb or disrupt this marine life, Respondent has expressed a desire in relocating the structure to a position further offshore.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Natural Resources 7/ enter a final order DENYING an extension of Permit No. 86-155PB. DONE AND ORDERED in Tallahassee, Leon County, Florida, this 21st day of April 1994. ERROL H. POWELL Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 21st day of April 1994.

Florida Laws (2) 120.57161.041
# 5
KELLY CADILLAC, INC., AND HUDSON CONSTRUCTION COMPANY vs RESORT HOSPITALITY ENTERPRISES, LTD., AND DEPARTMENT OF ENVIRONMENTAL PROTECTION, 97-000342 (1997)
Division of Administrative Hearings, Florida Filed:Tallahassee, Florida Jan. 22, 1997 Number: 97-000342 Latest Update: Jul. 02, 1998

The Issue The issues to be resolved in this proceeding concern whether the Department of Environmental Protection (DEP) has jurisdiction over the activities encompassed by Permit Application BA-475 (Amended) and, if so, whether issuance of the permit complies with the applicable provisions of Section 161.053, Florida Statutes, and Chapter 62B-33, Florida Administrative Code.

Findings Of Fact Undisputed Facts: The following relevant facts are established by stipulation or admission and are not disputed. The proposed project is landward of the seasonal high waterline within thirty (30) years of December 1996; The project will not interfere with public access; The project will not result in the net excavation of in situ sandy soils seaward of the coastal construction control line (CCCL); Any sandy soil or material excavated for the proposed project seaward of the control line will remain seaward of the control line or setback and be placed in the immediate area of construction; The proposed project complies with the structural provisions of Rule 62B-33.007(2), Florida Administrative Code; The proposed project complies with Rules 62B-33.007(3)(a) through (d) and (f) through (h), Florida Administrative Code. Additionally at hearing, the Petitioners and Intervenor announced that they would not present any evidence on the issue of adverse impacts on marine turtles. Accordingly, impacts on marine turtles are not at issue in this proceeding. Project Description: RHE has proposed constructing a restaurant, pool, deck and stormwater basin within the Boardwalk Beach Resort on Panama City Beach, in Bay County, Florida. The Boardwalk Beach Resort consists of four (4) multi-story hotels with six hundred (600) rooms all together, several pools, boardwalks extending the length of the property and approximately seventeen hundred (1,700) to eighteen hundred (1,800) feet of beach front property. The project site is between Thomas Drive to the north and the Gulf of Mexico to the south. On July 23, 1996, RHE applied to the Department for a CCCL permit to construct, seaward of the interim line established by the emergency Order of October 16, 1995, the restaurant, swimming pool and deck. Part of the proposed deck was located seaward of the coastal construction setback line. On December 9, 1996, the Department issued a permit to RHE to construct the restaurant building with an attached deck fifteen (15) feet landward of the location originally proposed by RHE, as well as for construction of the swimming pool. On December 16, 1996, the Department issued to RHE an Amended CCCL permit authorizing construction of a restaurant building located five (5) feet landward of the location originally proposed by RHE, as well as a deck re-designed so that it would be structurally independent of the restaurant, a swimming pool and a dune enhancement plan which would restore the sandy dune seaward of the pool and restaurant location to its pre-hurricane Opal condition and elevation. The Amended permit would require re-vegetation of the dunes at the site with native plants to secure the dunes from erosion. Both the original and the Amended permits authorized the removal of the stormwater drainage pipe that carried stormwater onto the beach that had caused erosion of the beach near the project area. On January 9, 1997, the Petitioners timely filed a Petition challenging the Department’s decision to issue the Amended permit. On February 7, 1997, the Department established a new CCCL line for Bay County that was farther landward than either the old coastal construction setback line or the interim line established in the October 1995 emergency order. The project authorized by the Amended permit would thus be located entirely seaward of the newly established CCCL for Bay County. As of February 7, 1997, the date the new line was established, RHE had not begun working on the foundation or continued construction above the foundation for any of the structures authorized by the Amended permit. The Department determined that the project did not meet the requirements of Section 161.053(9), and Rule 62B-33.004(1), Florida Administrative Code, so as to qualify for an exemption from complying with the newly established CCCL for Bay County, as the project was not “under construction” at the time the new CCCL was established. The beach and dunes system is wide and the dune system is a significant one, with elevations of fourteen (14) to sixteen (16) feet NGVD, with a wide dune crest. The dry sandy beach in front of the site, even after hurricane Opal struck, remained approximately one hundred twenty-five (125) feet wide. From 1855 to 1934 the shoreline of the site was mildly accretional. Thereafter, until 1955 accretion was less significant, but from 1955 to 1976 became significant. From February 1992 through April 1995, the project site experienced a period of mild erosion. Accordingly the long-term data shows, in essence, that the shoreline is relatively stable at the site. Hurricane Opal caused the dune to erode or retreat landward by approximately a distance of fifteen (15) feet. Hurricane Opal was a major magnitude storm with one hundred twenty-five (125) mile per hour sustained winds and one hundred forty-four (144) mile per hour measured gusts when it came ashore in the vicinity of the proposed site. The dune portion of the proposed site now essentially mimics the pre-Opal conditions. Following hurricane Opal the applicants spent approximately Four Hundred Thousand Dollars ($400,000.00) in dune restoration along the entire shoreline of the resort property, some seventeen hundred (1,700) to eighteen hundred (1,800) feet of shoreline. That dune restoration work was permitted by the Department. There is now little native salt-tolerant vegetation on the site in its natural pre-construction condition. An existing stormwater drainage pipe and catch basin extend onto the beach seaward of the location of the proposed restaurant. The existing pipe and basin have caused erosion of the beach and the sand dune system on the project site. Under the amended permit proposal the stormwater pipe and basin would be removed. All of the proposed structures authorized by the Amended permit would be landward of the pre-Opal coastal construction control line. The proposed pool will be located landward of the dune crest and fifty-five (55) feet landward of the toe of the dune. The proposed restaurant would also be located landward of the dune crest and two hundred five (205) feet landward of the mean high waterline. The original design of the project was for a much larger, three story restaurant. The original pool design called for a one hundred twenty foot pool extending from in front of the Comfort Inn to beneath the proposed restaurant, in effect being located on the first floor of the restaurant. At DEP’s request the size of the pool was reduced by fifty percent (50%) and it was relocated into the shadow of the Comfort Inn next door so that it will no longer serve as an integral part of the restaurant. Pool depths were also reduced to three (3) feet at DEP’s request. The pool, at DEP’s request, will now be constructed of Gunnite concrete material and will be frangible, that is, it will be designed to break up in storm-surge or storm-waves. This will serve to decrease the erosion which could be caused by storm-waves flowing over and around the pool structure. The same is true of the restaurant deck, which at DEP’s request has been re-designed to be separate from the restaurant and also designed to fail in storm conditions. The frangibility of the deck, as now proposed, will retard erosion during storm conditions, as the stormwater or waves will demolish the deck and remove it rather than scouring the sand dune around it. The Department also requested that the existing stormwater drain pipe and catch basin be removed and such a removal has been made a condition of the subject permit. This will require that the applicant design and build a new stormwater system. The applicant has agreed to this condition and the others referenced above. Vegetation: Construction of the proposed project will not result in the removal or destruction of native vegetation. There is no such vegetation on the site where the construction will take place. Thus, construction of the project will not result in removal or destruction of native vegetation which will either cause de-stabilization of a "frontal, primary or significant dune" or cause a significant adverse impact to the beach and dune system due to increased erosion by wind or water. A special condition of the proposed amended permit requires that the applicant submit a dune enhancement plan for restoration of the dunes seaward of the pool and restaurant to its pre-hurricane Opal condition, including re-vegetation. Such a plan was submitted by the applicant and it includes the planting of sea oats on one (1) foot centers. The planting of sea oats as part of the dune enhancement plan will constitute a significant improvement to the native vegetation situation at the site. Disturbance of Sandy Soils: The project will not result in the removal or disturbance of in situ sandy soils of the beach and dunes system to such a degree as to have an adverse impact on the system. That is, the existing ability of the system to resist erosion during a storm will not be reduced. The proposed project will not result in the removal or disturbance of in situ sandy soils of the beach and dune system to such a degree as to cause adverse impact to those systems by lowering existing levels of storm protection to upland properties and structures. All the sandy material excavated for the pool and the stormwater basin will be placed seaward of these structures on the dune in the immediate area of the construction and seaward of the CCCL. The additional sand to be placed on the dune as part of the dune enhancement plan will, in fact, enhance the ability of the system to resist erosion during the storm. The ability of the dune to resist storm erosion is primarily a function of the quantity of sand within the dune system. The additional sand to be placed on the dune as part of the dune enhancement plan will enhance the protection of upland properties and structures including those of the Petitioners and Intervenor. Excavation of the stormwater basin will not destabilize the dune on the project site. The applicant is moving the stormwater basin landward by twenty (20) feet which will minimize the potential impacts of the basin on the dune system. The preponderant evidence establishes that the structure of the pool and pool deck will not cause an increase in structure-induced scour of such a magnitude as to measurably affect shoreline change rates. Scour caused by the pool will not significantly interfere with the beach-dune system's ability to recover from a coastal storm. The frangible design of the pool decreases the likelihood that it will cause any scour. It will break up in a storm so that any scour caused by the pool would be minimal. Any scour caused by the pool would not disturb the topography or vegetation such that the coastal system would become unstable or suffer catastrophic failure. Scour would have no measurable effect. The proposed restaurant and deck will not cause an increase in structure-induced scouring during a storm of such a magnitude as to have a significant adverse impact. The restaurant and deck will be constructed on piles. Scouring around piles, in a storm situation, is very localized and insignificant. By constructing the restaurant and deck on piles at the design elevation, storm-surge and storm-waves will pass under the deck and restaurant. The restaurant and deck are located a sufficient distance landward of the beach and frontal dune to permit natural shoreline fluctuations. The structures will be built on pilings and will be elevated above the storm-surge; thus they will not interfere with shoreline fluctuations. The restaurant and deck are located a sufficient distance landward of the beach and frontal dune so as to preserve and protect beach and dune system stability, in terms of the lack of interference with such. Other structures in the area are seaward of the proposed restaurant and deck, including Pineapple Willies Restaurant, located eleven hundred feet to the west. Those structures have not caused instability of the beach during hurricane Opal. Typically, existing structures do not cause instability of the dune systems. The restaurant and deck are located a sufficient distance landward of the beach and frontal dune so as to allow for natural recovery to occur following storm-induced erosion. Natural recovery commonly occurs under pile-supported elevated structures which is not the case with “slab-on-grade” structures which are not elevated. The pool and pool deck will permit natural shoreline fluctuations, will preserve and protect beach and dune stability, and will allow recovery after a storm because they are designed as frangible structures that will fail and disintegrate in a storm situation. Thus they will not appreciably affect the beach-dune system. Line of Construction: Most coastal construction in Bay County extends out to the pre-Opal CCCL while some construction extends beyond it. Throughout Bay County the line of construction is the pre-Opal CCCL. The line of construction is determined by the most seaward extent of similar existing structures in the immediate area of the proposed structure under consideration in a CCCL permit application. The proposed pool is landward of the line of construction determined by existing pools within the boardwalk beach resort. There are a number of existing multi-story structures to the east of the proposed restaurant that are located out to the pre-Opal CCCL. That pattern of construction continues to the east of the proposed restaurant. Approximately one thousand (1,000) feet to the east of the proposed restaurant is an existing multi-story major structure that is built out to the pre-Opal CCCL. The beach in the area of the project is highly developed with commercial and condominium buildings. Within eleven hundred to twelve hundred feet to the west of the proposed restaurant there is another major structure built out to the pre-Opal CCCL. Just beyond that structure are a number of additional major structures, including Pineapple Willie's Restaurant, that are constructed out to the pre-Opal CCCL. The multi-story major structures to the east and west of the proposed structure are within the immediate area of the restaurant. The proposed restaurant is located landward of the line of construction established by these major structures within its immediate area. That line of construction is the pre-Opal CCCL. DEP did not consider major structures more than one thousand (1,000) feet from the proposed restaurant when it determined the line of construction for the restaurant. It is DEP’s policy when reviewing CCCL applications not to consider structures more than one thousand (1,000) feet from a proposed structure when determining the line of construction. The one thousand (1,000) foot limit DEP uses to determine the line of construction is not embodied in a rule. There was no preponderant coastal engineering or other scientific evidence which justifies the one thousand (1,000) foot limit DEP imposes when it determines the line of construction. It was appropriate to consider the existing structures referenced above in assessing the line of construction for this amended permit application and considering those lying just beyond the one thousand (1,000) foot distance, because those existing structures dominate the coastal processees in the region and only lie just beyond one thousand (1,000) feet to the east and twelve hundred (1,200) feet to the west. If the Department had considered the above-referenced existing major structures just beyond one thousand (1,000) feet of the proposed restaurant, it would have been shown that the proposed project was landward of the thus established line of construction. No preponderant evidence was offered to explicate why the one thousand (1,000) foot limit was automatically adhered to in this situation. Moreover, the line of construction is not a prohibition in and of itself but rather is only one of several criteria that must be balanced in determining whether or not to approve a CCCL permit application. Projects have been approved seaward of the line of construction in the past. Minimization The location of the swimming pool at the most practicable landward location, the reduced size of the pool, as well as its frangible design and limited depth, has minimized its impact. The placing of the excavated material in the pool’s immediate area and the restoration of the dune in front of the pool and deck have minimized the impacts of the pool and deck. The construction of the restaurant on pilings with its design elevation above storm-surge and storm-wave elevations, together with locating it behind the dune crest and away from the active beach, has minimized the impact of the restaurant. The deck is on pilings as well, elevated above storm-surge and storm-wave levels. It will be physically separate from the restaurant and its design frangibility (so that it will fail in a storm) results in its impact being minimized. The stormwater basin is located as far landward as practicable. Its location and the placing of the materials excavated for the basin on the dune immediately adjacent to the basin has minimized the impact of the proposed stormwater basin on the beach-dune system. The restaurant, pool, deck, and stormwater system will not have a significant adverse impact to the beach-dune system. The restaurant will not adversely affect exiting shoreline change rates, will not significantly interfere with recovery following a storm, and will not disturb topography or vegetation such that the system will become unstable or suffer catastrophic failure. Cumulative Impacts The proposed project will not have an unacceptable cumulative impact. There are no other proposed similar projects to take into account and a cumulative impact assessment has shown there to be no adverse cumulative impact. No evidence was offered to show that an unacceptable adverse cumulative impact in terms of existing or other proposed projects will result. Positive Benefit The proposed project will have a net positive benefit on the beach-dune system. The removal of the slab-on-grade constructed building will have a beneficial impact because it will reduce the chance of storm erosion to the beach-dune system posed by such structures. The existing stormwater pipe and catch basin which cause erosion would be removed, resolving that erosion problem. Stormwater will now be retained in a new stormwater basin designed to serve 1.7 acres and it will not flow onto the beach for any rainfall event up to a one hundred year design storm. The new stormwater system is designed to recover quickly after a storm event and to treat stormwater. The removal of the stormwater pipe and catch basin, and the installation of the new stormwater basin will have a positive benefit to the beach-dune system. The new stormwater system complies with Special Permit Condition 7. Moreover the applicant will restore the dune seaward of the project to its pre-hurricane Opal condition and will plant sea oats, on one foot centers, throughout the restoration area in accordance with Special Permit Condition 1.8. Such restoration of the dune and vegetation will benefit the beach-dune system. The natural recovery process will take several decades without the placement of sand in the dune restoration project. The dune enhancement plan submitted by the applicant, in order to comply with Special Permit Condition 1.8, exceeds the requirements of that condition since it places more sand on the dunes than necessary to achieve pre-Opal conditions. Testimony of expert witness Michael Walhter, which is accepted, establishes that restored beaches and dunes function much like natural ones in storm events even though they can be somewhat inferior in resistance to storm-surge and waves since the sand is not as compacted at first. This dune enhancement plan, however, exceeds the permit requirements by placing more sand than necessary on the dunes to achieve pre-Opal conditions. The Interim CCCL On October 16, 1995, the DEP issued its emergency Order establishing an interim CCCL for Bay County one hundred feet landward of the pre-Opal CCCL. The Department established that interim line in order to regulate coastal development in the wake of Hurricane Opal. In 1978 the Legislature established criteria to be used by DEP in establishing or re-establishing all CCCL’s. They are thus to be established to define that portion of a beach-dune system subject to severe fluctuations from a one hundred year storm event. At the time of Hurricane Opal, DEP had not re-established the Bay County CCCL using a one hundred year storm event criterion. The interim CCCL for Bay County established by the above-referenced emergency Order did not utilize nor was it based on the statutory one hundred year storm event criterion. All twenty-three (23) other CCCL’s that have been established based on the statutory one hundred year storm event criterion were established by rule. As of January 15, 1997, the applicant had received all governmental approvals necessary to begin construction of the proposed project except for that which is the subject of this proceeding. On January 22, 1997, DEP by letter advised the applicant to cease and desist construction of the project. On February 7, 1997, the Department by rule then taking effect established a new CCCL.

Recommendation Having considered the foregoing Findings of Fact, Conclusions of Law, the evidence of record, and the candor and demeanor of the witnesses, it is, therefore, DETERMINED: That the Department of Environmental Protection has jurisdiction over the proposed project and that it is, therefore, recommended that a Final Order be entered granting the Respondent, Resort Hospitality’s CCCL application consistent with the terms and conditions espoused by the Final Order of December 17, 1997, Respondent’s Exhibit 2 and the project plans depicted in Respondent’s Exhibits 3 and 4. DONE AND ENTERED this 30th day of January, 1998, in Tallahassee, Leon County, Florida. P. MICHAEL RUFF Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 Filed with the Clerk of the Division of Administrative Hearings this 30th day of January, 1998. COPIES FURNISHED: Bram D. Canter, Esquire 103 North Meridian Street Tallahassee, Florida 32301 Thomas I. Mayton, Jr., Esquire Department of Environmental Protection 3900 Commonwealth Boulevard, Mail Station 35 Tallahassee, Florida 32399-3000 Thomas G. Tomasello, Esquire 1315 East Lafayette Street, Suite B Tallahassee, Florida 32301 Neil H. Butler, Esquire Butler and Long, P.A. Post Office Box 839 Tallahassee, Florida 32302-0839 Kathy Carter, Agency Clerk Office of General Counsel 3900 Commonwealth Boulevard Mail Station 35 Tallahassee, Florida 32399-3000 F. Perry Odom, Esquire Office of General Counsel 3900 Commonwealth Boulevard Mail Station 35 Tallahassee, Florida 32399-3000

Florida Laws (5) 120.54120.57120.68161.021161.053 Florida Administrative Code (6) 62B-26.02462B-33.00262B-33.00462B-33.00562B-33.00762B-33.008
# 8
PETER BROOM, JEREMY R. GEFFEN, AND DUANE JACKSON vs TOWN OF INDIAN RIVER SHORES AND DEPARTMENT OF ENVIRONMENTAL PROTECTION, 97-000294 (1997)
Division of Administrative Hearings, Florida Filed:Vero Beach, Florida Jan. 15, 1997 Number: 97-000294 Latest Update: Jan. 21, 1998

The Issue The issue for determination is whether the Town of Indian River Shores is entitled to a coastal construction control line permit to construct a beach access seaward of the coastal construction control line in Indian River Shores, Florida.

Findings Of Fact The Town of Indian River Shores (Town) is an incorporated municipality located on a five-mile stretch of the Atlantic Ocean in Indian River County, Florida. The Town has a population of approximately 2,700 residents. The Town's Public Safety Department has the combined functions of law enforcement, fire protection, and life support (lifesaving). All of the Officers of the Public Safety Department are cross-trained and cross-designated as police officers, firefighters, and emergency service specialists who are either paramedics or emergency medical technicians (EMTs). The Officers are on eight-hour shifts; each shift has approximately four to five Officers on duty, i.e., a police officer, a firefighter, a paramedic, and an EMT. When fully staffed, the Public Safety Department consists of 25 Officers. Because of the small number of Officers and their varied duties, restrictions and limitations are placed on their deployment. One of the vehicles used by the Public Safety Department in the performance of duties is an all terrain vehicle (ATV). The Public Safety Department has one ATV which is used on the beach for patrol and rescue purposes and for moving rescue and lifesaving equipment to and from the beach. In order to access the beach, the Public Safety Department must travel across the dune, primarily through private property (Corrigan Beach) located approximately 3.4 miles from the office of the Public Safety Department. The Town determined that this location was unsatisfactory for beach access due to the property being offered for sale, the great distance of the property from the Public Safety Department's office, and the dune being breached each time the ATV is taken onto the beach. The Town determined, however, that Beachcomber Lane, a public street within the Town, was the best choice for beach access and entry by the Public Safety Department. Beachcomber Lane is approximately 1,000 feet in total length and extends from Highway A1A to the bluff of the Atlantic Ocean. The Pubic Safety Department is located approximately 1,500 feet from Beachcomber Lane. The residents of Beachcomber Lane include Peter Broom, Jeremy R. Geffen, and Duane Jackson. At various times, the Public Safety Department has also used Beachcomber Lane as an access to the beach on emergency bases. Currently, a public raised wooden walkway, with steps, leads over the dune and onto the beach at the Atlantic Ocean end of Beachcomber Lane. In order for the Public Safety Department to obtain beach access by way of Beachcomber Lane, an access ramp will have to be constructed seaward of the coastal construction control line (CCCL). Such construction requires, among other things, a permit from the Department of Environmental Protection (DEP). To design and present the plan to the DEP for a proposed beach access by way of Beachcomber Lane, the Town obtained the services of Coastal Technology Corporation (Coastal Technology), an engineering firm. On July 24, 1996, Coastal Technology filed an application on behalf of the Town with the DEP for a permit to construct a beach access ramp seaward of the CCCL. The application process included the submission of detailed drawings and other documents required by DEP. In the application, Coastal Technology described the construction, in pertinent part, as follows: 6. The proposed work consists of the removal of Brazilian Pepper . . . and installation of a 100 foot (approximate) long, 10 foot wide stabilized emergency access ramp. To minimize the impact to the existing native vegetation, the proposed emergency access ramp will be located approximately 8 feet from the north Right-of-Way within the area of the existing Brazilian Peppers. . . . A 2-inch layer of washed concrete sand will be placed between the limestone and paver blocks for a proper leveling of the previous paver blocks. The paver blocks will be TURFSTONE . . . which . . . have been permitted by DEP at other locations. . . . The openings in the TURFSTONE will be filled with excavated beach sand from the proposed access ramp footprint. Any remaining sand . . . will be placed at the seaward end of the proposed access ramp. To mitigate for any potential impact to native vegetation, 6 sea grapes will be installed . . . and any sea oats removed during excavation will be kept alive and replanted within those areas void of sea oats. Three 6-inch by 6-inch pressure treated posts will be installed with a chain fence. A locking chain fence will be used to prohibit the general public from accessing the beach through the emergency access ramp. In the application, Coastal Technology presented the justification for the construction, in pertinent part, as follows: 7. The proposed access ramp at Beachcomber Lane is specifically for the use by the Town of Indian River Shores for emergency access to the beach. The access ramp will have a locking chain only accessible by the Public Safety Department and has been designed to accommodate four-wheel drive patrol and EMT vehicles. . . . Beachcomber Land [sic] site was chosen by the Town because of : 1) the relative stability of the shoreline at that location; and, [sic] 2) accessibility from the Indian River Shores Town Hall which is on the west side of A1A across from Beachcomber Lane. The application indicated that the proposed beach access ramp was being constructed for emergency access to the beach. However, prior to the filing of the application, both emergency and routine patrol access by the Public Safety Department were discussed as uses for the access ramp at public meetings by the Town's public officials in which the subject of the access ramp was brought up. Such use for the beach access ramp was contemplated by the Town from the very inception of the plan for the access ramp. Routine patrol is defined by the Public Safety Department to be patrolling approximately every other day for one or two hours. By notice dated August 7, 1996, the DEP requested public comment on the Town's application for the CCCL permit. By letter dated August 21, 1996, residents of Beachcomber Lane, including Mr. Broom, Mr. Geffen, and Mr. Jackson, provided the DEP with their comments on the Town's application. On September 3, 1996, the Town's application for the CCCL permit was considered complete by the DEP. On November 6, 1996, at the request of DEP, the Town conducted a public meeting to obtain public comments regarding the proposed beach access ramp. The residents of Beachcomber Lane were notified of the public meeting, and among the residents attending the meeting were Mr. Broom, Mr. Geffen, and Mr. Jackson. At the public meeting, the Town clearly stated that the proposed beach access ramp would be used by the Public Safety Department for both emergency and routine patrol purposes with the ATV. Also, the Director of the Public Safety Department indicated that, based upon information collected regarding criminal activity and suspected criminal activity along the beach, routine patrol was needed.2 The application process culminated in the issuance of a Final Order by the DEP on November 27, 1996, granting the CCCL permit, with special permitting conditions in addition to the standard conditions. The CCCL permit granted by the DEP was Permit No. IR-507. The proposed beach access ramp to be constructed is approximately 100 feet in length and 10 feet in width. The construction will utilize turf blocks which permit grass and foliage to grow through the blocks on the access-way. A provision of the DEP Final Order requires the removal of exotic plants (Brazilian Pepper), which are not native plants, and the replanting of native vegetation adjacent to the access-way. On December 6, 1996, public notice of DEP's issuance of the CCCL permit to the Town was published in the Town's local newspaper. The Town agrees to abide by the special conditions, as well as the standard conditions, to the issuance of the CCCL permit. The beach access ramp on Beachcomber Lane will be used by the Town's Public Safety Department for public service purposes, including emergency rescue, training, and routine patrol. Beachcomber Lane is the appropriate location for the beach access ramp. The DEP has determined that the construction of the beach access ramp meets all the requirements of the DEP for the issuance of the CCCL permit. The DEP has determined the proposed beach access ramp to be a minor structure. The construction of the proposed beach access ramp will cause no significant adverse impact or cumulative impact on the beach dune system. The design of the proposed beach access, with the conditions added by the DEP, minimizes adverse impact of the access ramp. Native vegetation will be maintained and replenished around the proposed beach access ramp. The proposed construction of the beach access ramp will not result in a significant adverse impact to the beach and dune system. No net excavation in the sandy soils seaward of the control line will result from the construction. No structurally induced scour will result from the construction because the proposed structure is designed to break- away during a storm. The potential for wind and waterborne missiles during a storm is minimized by the construction. Public access to the beach is not interfered with by the beach access ramp. The construction of the beach access ramp will occur in a nesting habitat of the marine turtle, i.e., loggerhead, leatherback and green turtle. The DEP addressed protection of the nesting area through one of its special conditions to the issuance of the CCCL permit. The special condition included "no construction, operation, transportation or storage of equipment or materials seaward of the dune crest during the marine turtle nesting season" which is March 1 through October 31 of each year. With this special condition, the construction, itself, will have no adverse impact on the marine turtle or the turtle nesting. The Town agrees to abide by this special condition.3 The access ramp, itself, will have minimal impact on the marine turtles and will not cause a "take" of the turtles. Furthermore, the use of the ATV by the Public Safety Department will have no adverse impact on the marine turtles or the turtle nesting. At hearing, the DEP made another recommendation for the issuance of the CCCL permit, involving the marine turtle. Prior to the issuance of the Final Order, the DEP was not fully aware that the proposed beach access ramp was to be used for both emergency and routine patrol access. Having considered the circumstance of routine patrol, the DEP further recommends that a survey of turtle nesting be conducted after construction, but prior to routine use, on the Town's entire five-mile stretch along the Atlantic Ocean to mark turtle nesting areas for their protection and to place certain restrictions on the use of the ATV vehicle. This recommendation will not prohibit or hinder the construction of the beach access ramp.

Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Environmental Protection enter a final order granting the Town of Indian River Shores the Coastal Construction Control Line Permit No. IR-507, with the special conditions as may be required by the Department for the protection of marine turtles. DONE AND ENTERED this 8th day of December, 1997, in Tallahassee, Leon County, Florida. ERROL H. POWELL Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (904) 488-9675 SUNCOM 278-9675 Fax Filing (904) 921-6847 Filed with the Clerk of the Division of Administrative Hearings this 8th day of December, 1997.

Florida Laws (6) 120.569120.57161.021161.041161.053161.58 Florida Administrative Code (3) 62B-33.00262B-33.00562B-33.007
# 10

Can't find what you're looking for?

Post a free question on our public forum.
Ask a Question
Search for lawyers by practice areas.
Find a Lawyer