The Issue At issue in this proceeding is whether the Department of Environmental Protection's decision to reject all bids submitted for the project entitled BDRS 52-01/02 was illegal, arbitrary, dishonest, or fraudulent.
Findings Of Fact Parties Petitioner, All America Homes of Gainesville, Inc. (All America), is a corporation doing business in the State of Florida. All America submitted a timely written bid in response to the Department's ITB and filed timely protests to the Department's actions. The Respondent, the Department of Environmental Protection, is an agency of the State of Florida which manages and operates state parks under its jurisdiction, and solicits construction projects in state parks, pursuant to Chapter 258, Part I, Florida Statutes, through its Division of Recreation and Parks, Bureau of Design and Recreation Services. The ITB In November, 2001, the Department issued an ITB on a construction project entitled Hillsborough River State Park Concession Building, project number BDRS 52-01/02. The ITB included the Bid Specifications for the project. Bids were required to be submitted no later than 3:30 p.m. on Tuesday, December 18, 2001, at the Bureau's Tallahassee, Florida, office. The written Specifications define several terms, including, but not limited, to the following: ADDENDUM: A written explanation, interpretation, change, correction, addition, deletion, or modification, affecting the contract documents, including drawings and specifications issued by the OWNER [Department] and distributed to the prospective Bidders prior to the bid opening. ALTERNATE BID: Separate optional bid item for more or less project requirement used for tailoring project to available funding. Also may consist of alternate construction techniques. BASE BID: Formal bid exclusive of any alternate bids. BID FORM: The official form on which the OWNER requires formal bids to be prepared and submitted. ORAL STATEMENTS: Verbal instruction. NOTE: No oral statement of any person, whomever shall in any manner or degree modify or otherwise affect the provisions of the contract documents.[1] SEALED BID: The formal written offer of the Bidder for the proposed work when submitted on the prescribed bid form, properly signed and guaranteed. The Bid Specifications also contained the following relevant sections: Alternatives If the OWNER wishes to learn the relative or additional construction cost of an alternative method of construction, an alternative use of type of material or an increase or decrease in scope of the project, these items will be defined as alternates and will be specifically indicated and referenced to the drawings and specifications. Alternates will be listed in the bid form in such a manner that the Bidder shall be able to clearly indicate what sums he will add to (or deduct from) his Base Bid. The OWNER will judge for himself that such alternates are of comparable character and quality to the specified items. The Order of the alternate may be selected by the Department in any sequence so long as such acceptance out of order does not alter the designation of the low bidder. ADDENDA If the Consultant[2] finds it would be expedient to supplement, modify or interpret any portion of the bidding documents during the bidding period, such procedure will be accomplished by the issuance of written Addenda to the bidding documents which will be delivered or mailed by the OWNER'S Contracts section to all bidders who have requested bidding documents. Interpretation No interpretation of the meaning of the drawings, specifications or other bidding documents and no correction of any apparent ambiguity, inconsistency or error therein will be made to any Bidder orally. Every request for such interpretation or correction should be in writing, addressed to the Consultant. All such interpretations and supplemental instructions will be in the form of written Addenda to the bidding documents. Only the interpretation or correction so given by the Consultant in writing and approved by the OWNER shall be binding, and prospective Bidders are advised that no other source is authorized to give information concerning, or to explain or interpret, the bidding documents. B-16 Bid Modification Bid modification will be accepted from Bidders, if addressed as indicated in Advertisement for Bids and if received prior to the opening of bids. No bid modification will be accepted after the close of bidding has been announced. Modifications will only be accepted if addressed in written or printed form submitted with the bid in sealed envelopes. Telegrams, facsimiles, separate sealed envelopes, written on printed modifications on the outside of the sealed envelopes will not be accepted. All bid modifications must be signed by an authorized representative of the Bidder. Modification will be read by the OWNER at the opening of formal bids. B-21 Rejection of Bids The OWNER reserves the right to reject any and all bids when such rejection is in the interest of the State of Florida, and to reject the bid of a bidder who the OWNER determines is not in a position to perform the work. B-23 Award of Bid . . .The qualified Bidder submitting the lowest bid will be that Bidder who has submitted the lowest base bid plus any selected alternates. . . . The OWNER reserves the right to waive any minor irregularities in bids received when such waiver is in the interest of the OWNER. The Award of Bid will be issued by the OWNER only with responsible Bidders, found to meet all requirements for Award of Bid, qualified by experience and in a financial position to do the work specified. Each bidder shall, if so requested by the OWNER, present additional evidence of his experience, qualifications and ability to carry out the terms of the Agreement. (Emphasis in original, except for Section B-10.) The Bid Form is included with the Specifications and provides in part: Base Bid: Furnish labor, equipment, Lump Sum $ supervision and material to construct a new concession building of 2940 square feet located at the Hillsborough River State Park along with the alteration of the existing concession building according to plans and specifications. Alternate #1: Furnish labor, equipment, Add Amt.$__ supervision and material to renovate the existing concession building according to plans and specifications. There is a separate section for "Allowances," i.e., Section 01210, for the Hillsborough State Park. This section provides in part: SECTION 01210 – ALLOWANCES * * * 1.2 SUMMARY This Section includes administrative and procedural requirements governing allowances. Certain materials and equipment are specified in the Contract Documents and are defined by this [sic] specifications as material and labor to be provided against a pre-determined allowance. Allowances have been established in lieu of additional requirements and to defer selection of actual materials and equipment to a later date when additional information is available for evaluation. If necessary, additional requirements will be issued by Change Order. * * * 3.3 SCHEDULE OF ALLOWANCES A. Allowance #1: Include in the base bid an allowance for the purchase and installation of. . . kitchen equipment. . . . The total dollar amount of the allowance to be included shall be $12,000.00. There is also a separate section for "Alternates," i.e., section 01230, for Hillsborough River State Park, which provides in part: SECTION 01230 – ALTERNATES * * * 1.3 DEFINITIONS Alternate: An amount proposed by bidders and stated on the Bid Form for certain work defined in the Bidding Requirements that may be added to or deducted from the Base Bid amount if OWNER decides to accept a corresponding change either in the amount of construction to be completed or in the products, materials, equipment, systems, or installation methods described in the Contract Documents. The cost or credit for each alternate is the net addition to or deduction from the Contract Sum to incorporate alternate into the Work. No other adjustments are made to the Contract Sum. . . . . 3.1 SCHEDULE OF ALTERNATES A. Alternate No. 1: Renovate the existing concession building in its entirety as shown in the drawings and specified herein. (emphasis added.) At this stage of the bidding documents, the contractor/bidder is requested to provide a Base Bid/Lump Sum on the Bid Form to "[f]urnish labor, equipment,. . .to construct a new concession building," and to provide an additional and separate amount for Alternate No. 1 to "[f]urnish labor, equipment, . . . to renovate the existing concession building." On December 13, 2001, the Bureau issued "Addendum No. One (1)" (written by the architect) to the ITB on the "Hillsborough River State Park – Concession Building." The Addendum contained the following relevant sections: Specification Section 01210: Allowances Add the following new paragraph 3.3.B: ”Allowance #2: Include in the base bid an allowance for the renovations of the existing concession building; renovations shall be defined by the Owner. The total dollar amount of the allowance to be included shall be $25,000." Specification Section 01230: Alternates Modify paragraph 3.1.A. as follows: "Alternate No. 1: Renovate the existing concession building as defined by the Owner, and as provided for under Section 01210, Allowances." (emphasis added.) Each contractor was required to sign the Addendum and attach it to the bid. By definition, and pertinent here, an addendum is an additional written instruction to a contractor during the bidding process. Based on the weight of the evidence, the purpose of this Addendum was to require the contractor to include a $25,000.00 Allowance (for Allowance # 2) in the Base Bid, for the work which might be performed if the Department requested the work to be performed for Alternate No. 1, i.e., for the renovation of the existing concession building.3 (The Department's architect decided it would cost approximately $25,000.00 to renovate the existing concession building, hence Allowance # 2.) In other words, the Addendum does not have a specific dollar amount to be included for Alternate No. 1. Rather, the $25,000.00 is an Allowance for the work described as Alternate No. 1, but the amount is to be included in the Base Bid and not as a separate line item, dollar amount. But, importantly, the Addendum did not delete the potential work to be performed as described in Alternate No. 1, although Mr. Bowman and others believed that the Addendum deleted Alternate No. 1. It deleted the necessity to place a specific dollar amount on the Bid Form for Alternate No. 1. (Mr. Bowman is a registered Professional Engineer and a licensed contractor. He has worked for the Department for 15 years and has served as Bureau Chief for two years. He supervises the contract section and the design section, which was responsible for preparing the technical plans and specifications and bidding out the job.) Mr. Bowman offered the following explanation why he believed the Addendum was confusing: Okay. I think the confusion that was created, you know, I think the addendum in itself, you know, said add $25,000 to the base bid, but then on the bid form, it still had the space down there for alternate number one, which alternate number one, which alternate number one had become $25,000 that was to be allowed for the concession building, and I think that's where the confusion came in because I think they were still confused, that they weren't really sure that they should not put that 25 down there but they knew they had been told in the addendum to do it and I think that's the reason for the notes and we got to the correspondence on the bid form, was they wanted to make sure that that's what we were wanting to do. And I think that's where the confusion came in. Like I said, it's always, if you could go back and do it again, it would be much wiser just to issue a whole new bid form and then we wouldn't be here today. But, we didn't do that. Okay. So, that's why we are here. The language in this Addendum, when read with the original Bid Specifications, apparently caused confusion with some of the bidders on the project. Several bidders called Marvin Allen (an architect and project manager for the Department's Bureau of Design and Recreation Services) prior to the submission of the bids, to clarify how the $25,000.00 Allowance should be shown on the Bid Form. (Mr. Allen did not author any of the specifications, including the Addendum.) He was listed as a contact person. He did not contact any bidders. But, Mr. Allen recalled telling each bidder who asked that the Allowance of $25,000.00 should be included in the Base Bid. But, he does not recall the names or numbers of the bidders who called, "possibly" three, four or five. Mr. Allen believed the Addendum was clear. According to Mr. Allen, the bidders who called him found the Addendum confusing. The oral responses to the bidders can be construed as interpretations of the Addendum. However, pursuant to Section B- 10 of the Specifications, any such interpretations were required to "be in the form of written Addenda to the bidding documents." Also, any such questions should have been in writing. If Section B-10 were complied with, all bidders would have been potentially on the same footing, or, at the very least, would have had access to a written clarifying document. Opening of the Bids On December 18, 2001, the bids were opened by Mike Renard, Contracts Manager with the Bureau of Design and Recreation Services, and Susan Maynard, Administrative Assistant. Mr. Dwight Fitzpatrick, a representative of All America, also attended the bid opening. The Bid Form submitted by Nelco showed a Base Bid of $355,478.00 (Lump Sum $355,478.00), and also showed an amount of $25,000.00 on the Alternate # 1 line (Add Amt. $25,000.00). See Finding of Fact 6. (It was clear to Mr. Renard that the $25,000.00 should have been included on Nelco's Base Bid. But Mr. Renard believed that Nelco submitted a responsive bid because the Department only accepted the Base Bid. Mr. Bowman agreed.) Nelco was the only one of five bidders to have a dollar amount in the Alternate #1 line under "Add Amt. $ ." All America submitted the second lowest Base Bid of $362,000.00. There was also a hand-written note on the All- America Bid Form that stated: "Addenda # 1 instruction to place $25,000 allowance in both Base Bid and as alternate # 1." Another hand written note was located below the "Add Amt. $-0-" line: "amount added in Base Bid with $25,000 allowance per Marvin Allen." The Department considered All America's bid responsive. It is a fair inference that three out of five of the other Bid Forms contained language indicating that the bidders were relying on Addendum No. One by placing the $25,000.00 Allowance in the Base Bid.4 It is uncertain whether they did so in light of the instructions of Mr. Allen concerning how to complete the Bids Forms. However, given the nature of the calls to Mr. Allen, there is a reasonable inference that there was some confusion among some of the bidders. The Department determined that Nelco submitted the lowest Base Bid, but the Department's staff had a question as to whether Nelco had included the $25,000.00 in its Base Bid. After conferring with his superiors, Mr. Renard was instructed to call Nelco to make certain that its Base Bid included the Allowance amount ($25,000.00). Mr. Renard spoke with Steve Cleveland, Nelco's Project Manager, "to verify the fact that [Nelco] had the allowance in their base bid." Mr. Cleveland orally confirmed that Nelco's Base Bid included the $25,000.00 Allowance. Mr. Renard asked Mr. Cleveland to send him a letter verifying this statement. Mr. Renard viewed this inquiry as a request for clarification or verification, not an opportunity for Nelco to modify its bid. Mr. Bowman agreed. (Mr. Renard did not believe Addendum No. 1 was confusing.) In a letter dated December 20, 2001, Mr. Cleveland confirmed that Nelco’s Base Bid of $355,478.00 included the Allowance amount and that Nelco could still perform the contract if the $25,000 Allowance was removed from its Base Bid pursuant to the ITB, i.e., that Nelco would perform the contract for $355,478.00 less $25,000.00, or $330,478.00, if the Department did not accept Alternate # 1 and the Allowance. (An alternate does not have to be accepted by the Department.) According to Mr. Renard, Mr. Cleveland never mentioned modifying, changing, or altering Nelco's bid. The Department only accepted the Base Bid for each bid. Mr. Renard did not consider it unusual to call a bidder or contractor to verify information to determine whether they can or cannot perform the work at the stipulated price. He considered it common to make this inquiry. Also, it was common in Mr. Bowman's experience to call a bidder to get clarification. Mr. Renard was not aware of any statute or rule which authorizes the Department to request clarification from a bidder after the bids are opened. Mr. Renard was more familiar with the bid forms than Mr. Allen. After receiving Mr. Cleveland's letter, the Department determined that Nelco submitted the lowest Base Bid and that the $25,000.00 amount that Nelco wrote on the Bid Form Alternate # 1 line, was a minor irregularity in the bid which the Department, as the Owner, could waive pursuant to the ITB. On December 20, 2001, the Department posted the Tabulation of Bids showing the anticipated award of the contract to Nelco. At the hearing, an unsigned letter on Department letterhead was introduced, which was addressed to Nelco and stated that Nelco submitted the apparent low bid. However, Mr. Renard testified that these letters are prepared routinely, but not mailed out without his signature. Mr. Renard did not recall signing the letter or ever sending out such a letter to Nelco. On December 21, 2001, the Department received a Notice of Intent to Protest letter from Allen E. Stine, the President of All America. In his letter, Mr. Stine stated that Nelco’s bid should have been rejected for failure to follow the specified format as per Addendum No. 1, or adjusted to have the $25,000.00 amount added to their Base Bid. Bid Protests All America filed a written formal bid protest on January 4, 2001. On January 9, 2001, Cindy Otero of All America, notified Mr. Renard by letter, and stated that Mr. Stine was available for a hearing regarding the bid protest. On January 28, 2002, Mr. Renard returned All America's check for the bond, stating that it was unnecessary. Mr. Stine recounted a number of unanswered telephone calls after the first protest was filed. During one conversation, Mr. Renard recalled Mr. Stine saying to him, "You can't do this, you can't do this." After receiving the first formal protest, the Department staff consulted with legal staff and reviewed the documents and bid procedures. Based on the number of questions received concerning the Addendum and the hand-written notes on several of the bid forms, Mr. Bowman, Bureau Chief, determined that the bid documents were confusing and ambiguous. (Mr. Bowman stated that this was their first bid protest in his 15 years with the Department.) Therefore, Mr. Bowman decided that it would in the best interest of the State of Florida to reject all of the bids pursuant to the Bid Specifications. Mr. Bowman felt that the ITB should be re-written in order to make it clearer and allowing all of the bidders to re-bid the project without any confusion or ambiguity. Mr. Stine stated that his "senior estimator" told him that the bid language "could be confusing." He and his "senior estimator" had a discussion about whether the Allowance should have been placed in the Base Bid or not. At the time of submission of All America's bid, Mr. Stine was clear that the Allowance should be placed in the Base Bid, especially after calling Mr. Allen. But, his senior estimator was not so clear. In order to appease him, Mr. Stine placed the hand-written note on All America’s proposal. Mr. Stine essentially, "cleaned" up his proposal. At the hearing, Mr. Bowman testified Rule 60D-5.0071, Florida Administrative Code, see Conclusion of Law 59, does not list "confusing or ambiguous bid specifications" as one of the circumstances allowing for the rejection of all bids. However, Mr. Bowman later stated during the hearing that he believed the circumstances listed in Rule 60D-5.0071 were not the only circumstances authorizing the Department to reject all bids. Mr. Bowman testified that he believed that general confusion among the bidders caused by the ambiguous ITB constituted sufficient grounds for rejecting all bids. Mr. Bowman was advised by legal counsel that rejecting all of the bids would probably result in another bid protest by Nelco, All America, or both. Thus, the Department decided to delay addressing All American’s first protest until after posting the rejection of all bids and receiving the subsequent protests, so that all of the protests could be resolved at once in an efficient and economical manner. Notwithstanding the Department's justifications for rejecting all bids and not proceeding on All America's initial protest, the record is unclear why the Department waited several months to reject all bids. On May 13, 2002, the Department posted the rejection of all bids. On May 16, 2002, the Department received a formal written protest of the rejection of all bids filed by All America. On May 17, 2002, Jerome I. Johnson, attorney for the Department, contacted Mr. Robert A. Lash, All America's counsel at the time, concerning the resolution of All America’s formal protest. (Before the final hearing, Mr. Lash, with All America's consent, withdrew as counsel for All America.) The parties agreed to suspend formal bid protest procedures until a meeting could be held between the parties in an attempt to resolve the protests. Mr. Johnson sent a letter dated May 21, 2002, to Mr. Lash confirming this conversation. On June 26, 2002, a meeting was held among the Department staff, legal staff, and Mr. Lash and Mr. Stine, representing All America. The parties were unable to resolve the protests. At the conclusion of the meeting, the parties agreed that formal protest procedures would not be implemented until Mr. Stine could confer further with his counsel. In a letter dated July 5, 2002, Mr. Lash stated that his client wished to proceed with formal protest procedures and requested an administrative hearing on the protests. Are the Specifications and Bid Documents Ambiguous and Was There Confusion? The parties stipulated that "[t]he Addendum language was confusing," notwithstanding the testimony of several witnesses that they were not confused. The Department's determination that the bid Specifications, including the Addendum, and the Bid Form, which remained unchanged after the Addendum was issued, were confusing and ambiguous, is supported by the weight of the evidence. This is particularly true regarding the Bid Form. The Addendum required the bidder to include an Allowance of $25,000.00 in the Base Bid for work described as Alternate # 1. But the Bid Form was unchanged to reflect the Addendum changes. The Bid Form retained a line for the bidder to submit an additional amount for Alternate # 1. Further, it appears that several bidders were confused, including, Mr. Stine, who spoke with Mr. Allen and requested and received clarification. Further, it is unclear whether all of the bidders, including Nelco, were aware of the oral interpretations or clarifications of the Addendum rendered to some of the bidders. Rejection of All Bids Based upon the foregoing, given the standard of review in this proceeding discussed in the Conclusions of Law, the weight of the evidence indicates that the Department's action, in rejecting all bids, was not illegal, arbitrary, dishonest, or fraudulent. The Department's staff was well-intended and made some mistakes along the way, e.g., by not changing the Bid Form, which they readily admit. But there was a rationale for rejecting all bids under the circumstances.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is recommended that the Department issue a final order dismissing All America’s Petition to Prevent Rejection of Bids and Award Contract to Petitioner and denying All America's request for attorney’s fees and costs. DONE AND ENTERED this 24th day of September 2002, in Tallahassee, Leon County, Florida. CHARLES A. STAMPELOS Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, FL 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 24th day of September 2002.
Findings Of Fact On June 23, 1984 Respondent, Department of Transportation (DOT), gave notice to qualified contractors that it would receive sealed bids on the following project: BROWARD COUNTY; FEDERAL AID PROJECT NO. I-595-1(313)9 (JOB NO. 86095-3449) and STATE PROJECT JOB NO. 86095-6449, SR-862 (I-595) (Griffin Road Detour), From Southwest 48th Ave. to Seaboard Coast Line Railroad North of Hollywood. Work consists of Extra-Heavy Grading; Construct New Pav't. and a Section of Widening and Resurfacing Existing Pav't. with Alt. 12Z" Limerock Base or 11", 9" or 7Z" Asph. Base Cse. (Type 1, 2 or 3) and Type III Asph. Conc. Leveling and Overbuilding Cse. both with Type S Asph. Conc. Structural Cse. and Asph. Conc. Friction Cse. (FC-1, 2 or 4); Storm Sewer and Small Drainage Structures; Conc. Curb and Gutter, Curb, Traffic Separator and Sidewalk; Conc. Handrail (Barrier); Guardrail (Rdwy. and Shop Bent); Fencing; Plugging Water Wells; Floating Silt Barrier; Muck Blanket; Sheeting; Water and Sanitary Sewer Lines; Aluminum and Steel Pipe Handrail; Traffic Signals; Highway Lighting; Roadway Signs; Pav't. Markings (Ref. Pav't. Markers, Painted and Thermoplastic Striping); and Incidental Items. Length 2.712 Miles. (B.I. 4140875) (APPROX. 550 CALENDAR DAYS) ON-THE-JOB TRAINING WILL BE REQUIRED FOR THIS PROJECT D.B.E. GOAL 12.0 PERCENT. The project is commonly known as the "Griffin Road Project" and is the forerunner to the construction of 1-595 in Broward County, Florida. The project generally consists of widening Griffin Road from two to six lanes for 2.71 miles so that the Road can be used as a detour while I-595 is under construction. Such bids were to be filed no later than 10:30 a.m. on July 25, 1984. Pursuant to state law, DOT set a 12 percent goal on the project for disadvantaged business enterprises (DBE). 2/ This means that at least 12 percent of the total work performed by the successful bidder must be subcontracted out to firms owned and controlled by socially and economically disadvantaged individuals and who are certified by DOT as qualified DBE's. The DBE specifications were set forth on pages 90 and 91 of the Special Provisions in the bid specifications and provided as follows: 2-5.3.2 Submittals for Contracts with Goals: For all contracts for which DBE and/or WBE contract goals have been established, each contractor shall meet or exceed or demonstrate that it could not meet, despite its good faith efforts, the contract goals set by the Department. The DBE and WBE participation information shall be submitted with the Contractor's bid proposal. Award of the Contract shall be conditioned upon submission of the DBE and WBE participation information with the bid proposal and upon satisfaction of the contract goals or, if the goals are not met, upon demonstrating that good faith efforts were made to meet the goals. The Contractor's bid submission shall include the following information (Submitted on Form No. 141-12 - DBE/WBE Utilization Form No. 1): The names and addresses of certified DBE and WBE firms that will participate in the contract. Only DBEs and WBEs certified by the Department at the time the bid is submitted may be counted toward DBE and WBE goals. A description of the work each named DBE and WBE firm will perform. The dollar amount of participation by each named DBE and WBE firm. 2-5.3.3 Submittals for Evaluating Good Faith Efforts; If the DBE or WBE goal is not met, sufficient information to demonstrate that the Contractor made good faith efforts to meet the goals shall be submitted. In accordance with the specifications, if a bidder cannot meet the DBE goal, it must submit with its bid proposal adequate documentation to prove that it made a "good faith effort" to fulfill the goal but was nonetheless unable to do so. A failure to meet the goal or to submit such documentation subjects the bidder to automatic disqualification and rejection. The bid specifications also defined the terms "socially and economically disadvantaged individuals," "disadvantaged business enterprise," and "woman business enterprise" on pages 93 and 94. All bidders were given copies of the bid specifications before they prepared their respective bids. In response to the notice, and as is pertinent here, Petitioners, Vito's Trucking and Excavating Company and Frank V. Louis Equipment Company (Vito), and Respondent-Intervenor, Triple R Paving, Inc. (Triple R), prepared and submitted bids on the project. 3/ Vito, which has its principal offices in Fort Myers, Florida, submitted a total bid of $6,458,918. Triple R, a firm located in Fort Lauderdale, Florida, submitted a bid in the amount of $6,557,913, or some $99,000 higher than the bid submitted by Vito. The DBE/WBE Utilization Form No. 1 submitted by Vito with its bid indicated the following firms would be used as DBE subcontractors on the project: Tate Transport & Equipment, Inc. $300,000 4.64 percent Battle Construction Company 370,000 5.70 Merl's Original Nursery 214,500 0.38 Advance Barricades & Signing, Inc. 91,500 1.42 These subcontract prices totaled 12.14 percent of Vito's total contract bid. On the DBE/WBE Utilization Form No. 1 submitted by Triple R, Community Asphalt Corporation (Community) was listed as being a subcontractor who would perform $800,000 of work, or 12.2 percent of its bid amount. Triple R also listed Advance Barricades & Signing, Inc. (Advance) as a subcontractor on the project, but the use of Advance was not necessary to achieve the 12 percent goal. On July 25, 1984 DOT opened the sealed bids and immediately began a review to determine if each bidder had complied with the 12 percent DBE goal. A review of Vito's bid revealed that Vito failed to meet the DBE requirements and that its bid was accordingly nonresponsive. The disqualification was required since Vito had allotted 1.42 percent of its work to Advance and Advance was not a certified DBE when the contract was let. This in turn reduced Vito's DBE percentage to 10.75, or below the 12 percent goal. Because of this, the bid of the next lowest bidder, Triple R, was accepted by the Department. A DOT bids award committee later voted 6-1 to reject Triple R's bid and relet the contract on the ground Triple R's bid exceeded Vito's by more than 1 percent. This decision was overruled by the Secretary of Transportation and Triple R was designated as the lowest and most responsive bidder on September 4, 1984. That prompted the instant proceeding. On the evening before the bids were to be filed with DOT (July 24, 1984), the estimator for Vito (Angelo Speno) went to Tallahassee where he received additional subcontractor quotes necessary to complete the firm's bid proposal form. Speno obtained a number of quotes from minority subcontractors desiring to work on the project. After receiving these quotes, and discussing the matter with Vito's president in Fort Lauderdale by telephone, Speno completed Vito's Utilization Form No. 1. Among those listed as a DBE was Advance Barricades and Signing, Inc. Advance is owned by four Caucasian women and is certified by DOT as a woman business enterprise (WBE). However, it is not certified as a DBE. Advance's estimator, Martin Yount, approached Speno on the evening of July 24 and gave a $91,500 quotation for providing "roadside signing" on the project. Yount also advised Speno that Advance was a "female- owned" organization, a certified BE, and that if the project had "female goals," this form would aid Vito in achieving that goal. Despite the bid specifications clearly distinguishing between a DBE and WOE, for some reason Speno did not distinguish between the two, and thinking that Advance was a male Hispanic organization, he used Advance to meet its DOE goal. Accordingly, Vito did not submit documentation to show it had made a good faith effort to utilize DOE firms on the project since it believed the 12 percent goal had been net. Because of this, DOT properly rejected its bid. Vito now contends that another certified subcontractor listed on its Utilization Form 1 (Tate Transport & Equipment, Inc.) will actually perform more work than is listed on the Form thereby increasing its total DOE percentage on the job to over 12 percent. However, since June, 1984 DOT rules have required that all DBE's be correctly listed at the time the bid is submitted. To permit amendments after the bid has been filed would encourage "bid shopping" and permit an apparent low bidder to evade the award of a contract if he saw fit to do so. Vito also contends Community is not a legitimate DOE even though certified by DOT. Accordingly, it asserts that Triple R likewise failed to meet the 12 percent DOE goal. In this regard, Vito has not initiated a proceeding challenging the certification, but relies instead solely upon a letter sent to DOT by Community on May 10, 1984 reflecting a change of ownership and control in the firm. But the letter in question merely reflects a change in officers and directors of the corporation, and no evidence was submitted to support the allegation that Community is no longer a DOE within the meaning of DOT rules. DOT has consistently treated compliance with the DOE rules as a material part of the competitive bidding process. It is DOT's policy and practice to reject a bid where the bidder fails to meet the DOE goals and fails to turn in a good faith package. Therefore, DOT's reserved right to waive technical errors in bid documents does not apply in the case at bar.
Recommendation Based on the foregoing findings of fact and conclusions of law, it is RECOMMENDED that Petitioners' formal protest and petition for formal proceedings be DENIED, and that the contract for the Griffin Road project be awarded to Triple R Paving, Inc., which submitted the lowest responsible bid on said project. DONE and ORDERED this 14th day of December, 1984, in Tallahassee, Florida. DONALD R. ALEXANDER Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904)488-9675 FILED with the Clerk of the Division of Administrative Hearings this 14th day of December, 1984.
The Issue Whether, in issuing the Revised Recommendation/Tabulation for contracts for Items 1 and 3 for Invitation to Bid No. 15- 048E, Multifunctional Devices, Cost-Per-Copy, Respondent acted contrary to one or more governing statutes, rules, policies, or procurement specifications, or any combination thereof; and if so, for each such instance, whether the misstep was clearly erroneous, arbitrary or capricious, or contrary to competition.
Findings Of Fact On June 3, 2014, SBBC issued ITB No. 15-048E (the ITB) entitled "Multifunctional Devices, Cost-Per-Copy" for the provision and maintenance of copying devices during the contract term. The listed Submittal Requirements were: Manufacturer's Authorization Special Condition 8; Descriptive Literature Special Condition 6; and Material Safety Data Sheets Special Condition 16. A Bidder's Preference Statement was not identified as a Submittal Requirement. Section 4, Paragraph 2, of the ITB was entitled "TERM" and notified bidders that SBBC sought through the award of this bid to "establish a contract for the period beginning from the date of award and continuing through June 30, 2017." The Bid Summary Sheet found at Section 5 of the ITB requested bidders to provide cost-per-copy based on a stated average monthly number of copies, and to extrapolate cost out for 12 months and for 36 months. Page 1 of the ITB contained a certification to be executed by each bidder's authorized representative which stated in pertinent part as follows: Bidder agrees to be bound to any and all specifications, terms and conditions contained in the ITB, and any released Addenda and understand that the following are requirements of this ITB and failure to comply will result in disqualification of bid submitted. All bidders submitted a signed bidder certification. Section 3, Paragraph 1(a), of the General Conditions of the ITB provided as follows: SEALED BID REQUIREMENTS: The "Bidder Acknowledgment Section" must be completed, signed and returned with the bid. The Bid Summary Sheet pages on which the Bidder actually submits a bid, and any pages, upon which information is required to be inserted, must be completed and submitted with the bid. The School Board of Broward County (SBBC) reserves the right to reject any bid that fails to comply with these submittal requirements. BIDDER'S RESPONSIBILITY: It is the responsibility of the Bidder to be certain that all numbered pages of the bid and all attachments thereto are received and all Addendum released are received prior to submitting a bid without regard to how a copy of this ITB was obtained. All bids are subject to the conditions specified herein on the attached bid documents and on any Addenda issued thereto. Section 3, Paragraph 6, of the General Conditions of the ITB provided as follows: AWARDS: In the best interest of SBBC, the Board reserves the right to: 1) withdraw this bid at any time prior to the time and date specified for the bid opening; 2) to reject any or all bids received when there are sound documented business reasons that serve the best interest of SBBC; 3) to accept any item or group of items unless qualified by Bidder; and 4) to acquire additional quantities at prices quoted on this ITB unless additional quantities are not acceptable, in which case, the bid sheets must be noted "BID IS FOR SPECIFIED QUANTITY ONLY." On June 18, 2014, SBBC issued Addendum Number 1 for the ITB which replaced a number of pages within the bidding documents and contained responses to questions posed by prospective bidders. Addendum Number 1 included Question No. 6 in which Xerox inquired whether SBBC "would . . . consider a change to the contract term of the contract to 48 or 60-month term?" SBBC responded through Addendum Number 1 that it had amended the bid "to include additional pricing for 48 or 60-months term[s]," and SBBC continued to request proposals for a 36-month contract term. Addendum Number 1 revised Section 4, Paragraph 2, of the Special Conditions of the ITB to state as follows: TERM: The award of this bid shall establish a contract for the period beginning from the date of award and continuing through an award for a term of 36, 48 or 60 months. Bids will not be considered for a shorter period of time. All prices quoted must be firm throughout the contract period. Items will be ordered on an as needed basis. Addendum Number 1 included an Appendix A–Summary Cost Sheet which required bidders to provide cost-per-copy based on a stated average monthly number of copies, and to extrapolate cost out for 12 months, 36 months, 48 months, and 60 months. On June 20, 2014, SBBC issued Addendum Number 2 for the ITB. The first page of Addendum Number 2 advised prospective bidders, "This Addendum amends the above referenced bid in the following particulars only: 1. DELETE: Appendix A–Cost Summary Sheet INSERT: Revised Appendix A–Cost Summary Sheet." The first page of Addendum Number 2 further cautioned bidders that "[i]t is important to include the REVISED page when submitting your response." Addendum Number 2 went on to provide a Revised- Appendix A-Summary Cost Sheet which stated "A Cost Summary Sheet must be completed for each options [sic] 36 months, 48 months and 60 months" and included a cost summary sheet for each of those three options. The ITB and addenda numbers 1 and 2 were released by SBBC via Onvia DemandStar, with email notices thereof to prospective vendors who subscribed to its bid notification service. Toshiba downloaded the ITB, Addendum Number 1, and at least the first page of Addendum Number 2 from DemandStar prior to the submission of its bid to SBBC. Again, the first page of Addendum Number 2 cautioned bidders that Appendix A–Summary Cost Sheet had been deleted and replaced and that it was "important to include the REVISED page when submitting your response." No bid specifications protest was filed by any person or entity concerning the ITB or addenda numbers 1 or 2. On July 3, 2014, SBBC opened bids timely submitted in response to the ITB by: Toshiba; ImageNet; Innovative; Lexmark International, Inc.; and Ricoh. Konica had also presented a bid to SBBC in the bid opening room prior to the opening of bids but after the announced time for submittal of bids. The Konica bid was delivered to SBBC but was not opened at the time of the bid opening. Toshiba, the incumbent, was the only bidder that violated the pricing requirements of the ITB. The bid submitted by Toshiba utilized the version of Appendix A-Summary Cost Sheet that was released under Addendum Number 1 and only offered cost- per-copy pricing for the 60-month term option. Toshiba's bid did not submit the Revised-Appendix A-Summary Cost Sheet issued under Addendum Number 2, nor did it contain any bids offering cost per copy pricing to SBBC for the 36 or 48-month term options. Although Toshiba's bid was not rejected as non-responsive for failing to bid on the 36 and 48-month term options and for failing to utilize and complete the Revised-Appendix A-Summary Cost Sheet issued under Addendum Number 2, SBBC's staff later concluded in hindsight that it should have been rejected for such non-compliance. Toshiba's bid included a "Pricing" note immediately prior to its Appendix A–Summary Cost Sheet that stated: [Toshiba] is proposing a 60 month CPC as a response to the [ITB]. Based on the fact the [ITB] has no minimum, cancellation for convenience, ability to upgrade and downgrade with no penalty, it is in the best interest of our organization to bid a term of 60 months. This term allows us to provide the most aggressive price to the [SBBC] and maintain the excellent service and support level in place. SBBC's staff recommended that an award be made under the ITB for pricing offered for a 36-month contract term for Items 1, 2, and 3 for a contract period of August 6, 2014, through September 30, 2017. On July 10, 2014, SBBC posted its initial ITB Recommendation/Tabulation which did not consider the Konica bid. The initial posted Recommendation/Tabulation notified bidders of SBBC's intended award of contracts for Items 1 and 2 to ImageNet as the primary awardee and to Innovative as the alternate awardee for a contract period of August 6, 2014, through September 30, 2017, and recommended the award of contracts for Item 3 to Ricoh as primary awardee and to ImageNet as alternate awardee for a contract period of August 6, 2014, through September 30, 2017. Timely bid protests and bid protest bonds were filed by Konica and by Toshiba concerning SBBC's initial Recommendation/Tabulation of July 10, 2014. SBBC's Bid Protest Committee conducted a meeting with the protestors on August 26, 2014, and determined that Konica's bid had been timely submitted and directed SBBC's Procurement and Warehousing Services Department (the Department) to evaluate Konica's bid for responsiveness. It also directed the Department to revise its recommendation on the ITB to reject Toshiba's bid for Item 2 as the device offered by Toshiba for that item did not meet the ITB's specifications which called for a single device capable of performing 95 copies per minute (cpm) and Toshiba instead offered two devices that performed at 85 cpm. After reviewing Konica's bid for responsiveness, SBBC posted a Revised Recommendation/Tabulation for the ITB on August 29, 2014, which (a) recommended award of Item 1 to ImageNet for a term from October 7, 2014, through November 30, 2017, as the primary awardee and to Innovative as the alternate awardee; (b) recommended award of Item 3 to Ricoh for a term from October 7, 2014, through November 30, 2017, as the primary awardee and to ImageNet as the alternate awardee; and (c) recommended the rejection of Toshiba's bid for Item 2 for its failure to meet the specifications for that Item. On September 4, 2014, Toshiba timely filed its notice of intent to protest the August 29, 2014, posted Revised Recommendation/Tabulation. On September 15, 2014, Toshiba timely filed its Amended Formal Petition Protesting Proposed Revised Recommendation/Tabulation. SBBC's Bid Protest Committee conducted a meeting with Toshiba on November 5, 2014, pursuant to section 120.57(3), SBBC Purchasing Policy 3320, and the ITB, and rejected Toshiba's bid protest. On November 10, 2014, Toshiba timely requested that SBBC forward its bid protest to DOAH for a formal hearing. Toshiba has presented a number of arguments in these proceedings seeking to avoid the circumstances Toshiba created for itself when it failed to comply with Addendum Number 2 and violated the ITB's pricing requirements and the ITB's requirement as to the term of the contract to be awarded, when Toshiba only submitted a single bid and restricted the contract term for which it would be considered to 60 months. First, Toshiba attempts to divest SBBC of its express authority to select proposals for any contract duration for which it solicited bids other than for a month term. Second, Toshiba argues that SBBC was somehow obligated to specify within the bid specifications those business considerations that would inform SBBC's selection of the duration of the contract term to be awarded under the ITB. Third, Toshiba argues that ImageNet was non-responsive regarding the ITB's specifications concerning manufacturer's certifications. Toshiba also argues that all bidders, including itself, were non- responsive with regard to the ITB's specifications regarding bidding preference laws. None of the arguments presented by Toshiba in opposition to SBBC's intended award of Items 1 and 3 are persuasive. The Selection of the 36-Month Term SBBC's recommended award for a 36-month contract period from October 7, 2014, through November 30, 2017, is consistent with the terms and conditions of the ITB and its addenda. At the very start of this competitive solicitation, SBBC informed bidders through Section 4, Paragraph 2, of the ITB and the Bid Summary Sheet at Section 5 of the ITB that it was seeking a contract through June 30, 2017-–i.e., a 36-month contract. SBBC also made it clear in its response to Question No. 6 of Addendum Number 1 that "[t]he contract will be for a full 36 months." Although SBBC revised the bid specifications through Addendum Number 1 to allow bidders to submit "additional pricing for 48 and 60 months term[s]," "to allow the School District to consider a 48 and/or 60 months term contract," and revised Section 4, Paragraph 2, of the ITB to provide for "an award for a term of 36, 48 or 60 months," it was clear under the ITB that SBBC contemplated that a 36-month contract could serve its needs. Addendum Number 2 further revised the bid specifications by providing the Revised–Appendix A–Summary Cost Sheet which informed bidders that "a Cost Summary Sheet must be completed for each options [sic] 36 months, 48 months and 60 months." SBBC intended to review the additional pricing offered for 48 and 60- month contract terms to determine whether those particular options were a better business decision for SBBC. Several factors were considered by SBBC in selecting the contract duration for the award under the ITB. The selection of the shorter 36-month contract term was consistent with the expressed terms of the ITB and addenda and the expressed preference of SBBC's governing board to refrain from entering into long-term contracts and enabled SBBC to be flexible in finding solutions to its copying needs and to take advantage of changes that may arise in technology; avoided problems the school district was currently experiencing with a long-term cost-per- copy contract which ranged from equipment performance issues to the long-term placement of technology in schools; and enabled the school district to conduct research to determine whether future implementation of a managed print solution would provide the school district with additional cost savings or financial benefits in contrast to the cost-per-copy services being procured through the ITB. Clearly, this selection was neither arbitrary nor capricious. SBBC's elected governing board has made it known by its actions taken at public meetings that it disfavors long-term contracts for the procurement of goods and services and has gone so far as to reduce the term of contracts from the dais. SBBC's staff determined that the pricing offered to SBBC for a 60-month contract term was not significant enough to recommend a contract longer than the 36-month term SBBC had been requesting since the release of the ITB. Any cost advantages offered by Toshiba's bids for Items 1, 2, and 3 were reduced by $525,000 per year due to the disqualification of its bid for Item 2, which failed to meet the ITB's specifications. Consideration of Managed Print Services Xerox Corporation informed SBBC that a managed print services (MPS) program could save millions of dollars per year and later submitted a no bid response to SBBC regarding the ITB because SBBC was not implementing a MPS program under the ITB. SBBC had also received proposals from vendors in October 2013 concerning a MPS program and concluded that there existed a potential annual savings of millions of dollars if such a program could be implemented. All of which were additional reasonable, rational reasons for SBBC to remain consistent with its decision to award the contracts for a term of 36 months and not something longer. The ITB contains standard terms and conditions which enable SBBC to terminate an awarded contract regardless of reason and with or without cause upon 30 days written notice to the other party. Toshiba wants SBBC to rescue Toshiba from its failure to submit required bids for 36-month and 48-month periods by forcing SBBC to award a contract obligating the agency for a longer duration under the ITB than desired by the agency and then have SBBC terminate the 60-month contract award for convenience after 36 months. SBBC includes termination for convenience provisions within its contracts for goods and services due to section 1011.14, Florida Statutes, which restricts the ability of district school boards to obligate public funds for a period beyond one year. The inclusion of the standard termination for convenience clauses in its ITBs enables SBBC to enter into contracts exceeding one year which affords the school district opportunities to obtain continuity of service and price advantages that would not be available under shorter contracts. While SBBC has the ability under the ITB to terminate contracts for convenience upon 30 days' notice, it rarely does so. SBBC has never exercised its right to terminate its two prior contracts for the services sought under this ITB. Any such termination requires action by SBBC's governing board during a public meeting. SBBC's staff would not engage in the sham of recommending a contract to its governing board for a contract term longer than the period for which it intends to procure services from a vendor. SBBC's procurement staff believes that using the termination for convenience clause in the manner Toshiba recommends can have an adverse effect upon the school district's ability to encourage bidders to participate in its competitive solicitations or to offer it their best pricing. Questions 1 and 59 of Addendum Number 1 of the ITB provide evidence of concern within the bidding marketplace that SBBC might exercise its termination for convenience clauses with regard to the services being procured under the ITB and support the perception of SBBC's that it should avoid a reputation for exercising such termination authority. Toshiba argues that SBBC somehow materially misled bidders through the ITB by stating in response to Question No. 3 concerning MPS of Addendum Number 1 that: The School District is not planning to implement a Managed Print Services at this time. The School District would like to receive Additional information regarding other districts that have implemented a Managed Print Services. There are no evaluation points associated with this ITB. SBBC's responses to Question No. 3 of Addendum Number 1 were accurate and did not mislead bidders. Toshiba is the only bidder to claim to have been misled. Section 6, Paragraph 10, of the ITB requested bidders provide SBBC with information about how the awardee could transition SBBC to a MPS model from the cost-per-copy model being offered under its bid. While SBBC requested such information from vendors within the bidding marketplace, there is no evidence that any bidder's provision or omission of such information within its bid submission was considered in the selection of the recommended awardees. In fact, ImageNet was recommended for award even though it did not provide this ancillary information about transition to a MPS delivery model. Rather, the recommended awardees for a 36-month contract term for Items 1 and 3 were determined solely on the basis of cost submitted for those items by the bidders, all in accordance with the ITB. A MPS program was a possible initiative being considered by SBBC's former Chief Information Officer prior to his departure from SBBC in February 2014, at which time the school district's current cost-per-copy contract was nearing its expiration. Although SBBC still had an interest in the possibility of a MPS program, it was not going in that direction at the time it needed to release a bid for copying services to replace its current expiring contract. Toshiba contends that SBBC was somehow required to disclose to bidders whether the potential future implementation of a MPS program might impact the contract award period that SBBC might choose under the ITB. A myriad of business considerations may inform an agency in selecting the length of its contracts for goods and services, and there is no law or rule that requires an agency to specify those factors within an ITB. Responsiveness of the Bidders Toshiba has attempted to argue that ImageNet, the recommended awardee for Item 1 and the alternate awardee for Item 3, was somehow non-responsive under the ITB and ineligible for award. In support of this argument, Toshiba has referenced Section 4, Paragraph 8, of the Special Conditions of the ITB which state as follows: MANUFACTURER'S CERTIFICATION: Bidder must submit with their ITB a notarized letter from manufacturer certifying that bidder is authorized to sell, service and warrant the multifunctional devices offered within this ITB. Failure of the bidder to provide this letter with their submitted bid or upon request shall result in disqualification of entire bid. If the bidder is the manufacturer, then bidder should state that their company is the manufacturer of the equipment provided in this bid (the letter does not need to be notarized). A bid is only disqualified under Section 4, Paragraph 8, of the ITB if (1) a notarized manufacturer's letter is omitted from the bid; and (2) the bidder fails to comply with a subsequent request from SBBC to provide the letter. No bidder, including Toshiba and ImageNet, included a notarized letter from a manufacturer with its bid. SBBC did not request any of the bidders to submit a notarized manufacturer's letter at any time after the submission of bids. As a result, none of the bids, including that of ImageNet, was non-responsive for a failure to satisfy Paragraph 8 of Section 4 of the ITB. Toshiba has also argued that all bids should be rejected due to Section 3, Paragraph 1(d), of the General Conditions of the ITB which concerns bidders' preference laws and states as follows: d) BIDDING PREFERENCE LAWS: ALL BIDDERS MUST COMPLETE AND SUBMIT THE LEGAL OPINION OF BIDDER'S PREFERENCE FORM IN ORDER TO BE CONSIDERED [sic] FOR AWARD. The State of Florida provides a Bidder's preference for Florida vendors for the purchase of personal property. The local preference is five (5) percent. Bidders outside the State of Florida must have an Attorney, licensed to practice law in the out-of-state jurisdiction, as required by Florida Statute 287.084(2), execute the "Opinion of Out-of-State Bidder's Attorney on Bidding Preferences" form and must submit this form with the submitted bid. Such opinion should permit SBBC's reliance on such attorney's opinion for purposes of complying with Florida Statute 287.084. Florida Bidders must also complete its portion of the form. Failure to submit and execute this form, with the bid, shall result in bid being considered "non-responsive" and bid rejected. No bidder, including Toshiba, included an "Opinion of Out-of-State Bidder's Attorney on Bidding Preferences" form with its bid. Each bidder's omission of that form was for good reason. Section 3, Paragraph 1(d), of the General Conditions of the ITB is a boilerplate provision within SBBC's standard bidding documents that is included pursuant to section 297.084(2), Florida Statutes, for any competitive solicitations in which personal property is to be purchased by SBBC. In instances in which it solicits bids to purchase personal property, SBBC includes a "Bidder's Preference Statement" form and includes that form among the checked "Submittal Requirements" listed in Section 2, Page 1, of the ITB. This ITB did not include a "Bidders Preference Statement" form among the bidding documents or list it as one of the required submittals. The state law and the boilerplate provision at Section 3, Paragraph 1(d), of the General Conditions of the ITB are only applicable to competitive solicitations for the purchase of personal property and do not extend to competitive solicitations for the purchase of services. As Section 4, Paragraph 12, of the Special Conditions of the ITB makes it clear that the multi-functional devices to be provided by the awardee under the ITB will "remain the property of the vendor," the standard bidder's preference provision contained within the ITB is plainly inapplicable to this procurement.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the School Board of Broward County enter a final order that adopts the Findings of Fact and Conclusions of Law contained herein, dismisses the protest filed by Toshiba Business Solutions (USA), Inc., and upholds the awards of contracts under the procurement for a 36-month term from October 7, 2014, through November 30, 2017, to ImageNet Consulting of Miami, Inc., as the primary awardee for Item 1 and to Innovative Software Solution, Inc., as the alternate awardee for Item 1, and to Ricoh USA, Inc., as the primary awardee for Item 3 and to ImageNet Consulting of Miami, Inc., as the alternate awardee for Item 3. DONE AND ENTERED this 15th day of June, 2015, in Tallahassee, Leon County, Florida. S MARY LI CREASY Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 15th day of June, 2015. COPIES FURNISHED: Robert Paul Vignola, Esquire Office of the General Counsel Eleventh Floor 600 Southeast Third Avenue Fort Lauderdale, Florida 33301 (eServed) William G. Salim, Jr., Esquire Moskowitz, Mandell, Salim and Simowitz, P.A. 800 Corporate Drive, Suite 500 Fort Lauderdale, Florida 33334 (eServed) Eric J. Rayman, Esquire Genovese, Joblove and Battista, P.A. PNC Center, Suite 1110 200 East Broward Boulevard Fort Lauderdale, Florida 33301 (eServed) Albert E. Dotson, Esquire Wendy Francois, Esquire Bilzin, Sumberg, Baena, Price and Axelrod, LLP 1450 Brickell Avenue, Suite 2300 Miami, Florida 33131 (eServed) Matthew Mears, General Counsel Department of Education Turlington Building, Suite 1244 325 West Gaines Street Tallahassee, Florida 32399-0400 (eServed) Robert W. Runcie, Superintendent Broward County School Board Tenth Floor 600 Southeast Third Avenue Fort Lauderdale, Florida 33301 (eServed) Pam Stewart Commissioner of Education Department of Education Turlington Building, Suite 1514 325 West Gaines Street Tallahassee, Florida 32399-0400 (eServed)
The Issue Whether a bid dispute arising in connection with an emergency bid letting is an appropriate subject for formal administrative proceedings, in the absence of an administrative challenge to the fact of the emergency?
Findings Of Fact The parties stipulated that DOT had "received [Baxter's] notices of protest dated September 23, 1983, October 14, 1983, and December 16, 1983, protesting the Department of Transportation's determination that Baxter's Asphalt was not the lowest responsible bidder on this project and petitioning for formal administrative hearings." Baxter's bid was indeed the apparent low bid on Job No. 53030-3511, but DOT has taken the position that Baxter is not a responsible bidder, and has disregarded Baxter's bid on that account. The DOT has moved beyond proposed action and has actually awarded the contract to Gulf, the second low bidder. The parties stipulated: Pursuant to Section 120.53(5)(c) , Florida Statutes, the Department has decided to proceed with the award and execution of the contract with Gulf Asphalt Corporation in order to avoid what the Department perceived as an immediate and serious danger to the public health, safety, or welfare. DOT executed the contract with Gulf on January 6, 1984. As grounds for executing the contract, notwithstanding the pendency of formal administrative proceedings, the Secretary of the DOT stated: ...The conversion of this two lane roadway to a four lane facility is badly needed to increase the traffic capacity and improve the safety of the highway for the traveling public. This section of roadway has a structural rating of 35 which places it in the "Critical" range . . . [and] has an accident ratio of 1.244 which is almost 25 percent above the average rate. dditional funds were appropriated by the Florida Legislature so that work could proceed without delay. It is also imperative that these projects proceed in an orderly fashion to maximize the effective use of [DOT] construction in spection and supervisory personnel. Letter from Secretary Pappas to Baxter, December 23, 1983. Baxter does not concede that an emergency exists with respect to Job No. 53030- 3511, but did concede that the existence of an emergency was for the agency head to determine, subject only to judicial review. In its petition for formal administrative proceedings, Baxter did not raise the question whether an emergency exists. For purposes of the present administrative proceeding, there is no dispute or issue as to the existence of the emergency.
Recommendation Upon consideration of the foregoing, it is RECOMMENDED: That respondent dismiss petitioner's formal written protest as moot. DONE and ENTERED this 9th day of February, 1984, in Tallahassee, Florida. ROBERT T. BENTON II Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32301 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 9th day of February, 1984. COPIES FURNISHED: Frank A. Baker, Esquire Roberts and Baker P. O. Box 854 Marianna, Florida 32446 Robert I. Scanlan, Esquire Department of Transportation Haydon Burns Building, MS-58 Tallahassee, Florida 32301 Paul A. Pappas, Secretary Department of Transportation Haydon Burns Building Tallahassee, Florida 32301
The Issue The issue is whether the proposed award of Invitation to Bid No. 06-DC-7727 to Communications Engineering Service Company is contrary to the Department of Correction’s governing statutes, rules, policies, or the specifications in the Invitation to Bid for the reasons alleged by Petitioner.
Findings Of Fact The Department issued ITB No. 06-DC-7727 on October 27, 2006. The purpose of the ITB was to solicit bids for maintenance and repair of radio equipment owned by the Department in each of its four regions. The original deadline for submitting bids in response to the ITB was November 30, 2006, but the deadline was extended to December 15, 2006, through an addendum to the ITB. First Communications, CES, and Motorola, Inc., submitted bids for Region I. Another company, Econo Communications, Inc. d/b/a Mobile Communications, also responded to the ITB, but it did not bid on Region I. It was stipulated that First Communications’ bid was responsive to the ITB. The Department determined that the bid submitted by Motorola was not responsive to the ITB. That determination was not challenged. The Department determined that the bid submitted by CES was responsive, despite the issues discussed below. CES was determined by the Department to be the lowest responsible bidder. The bid submitted by CES was $2,571 per month.1 First Communications was the next lowest bidder. Its bid was $3,408.85 per month,2 which is 32.6 percent higher than CES’s bid. Section 4.3.1 of the ITB states that “it is essential that bidders follow the format and instructions contained in the Bid Submission Requirements (Section 5 with particular emphasis on the Mandatory Responsiveness Requirements).” Section 5.1 of the ITB lists the “mandatory responsiveness requirements” for bids, and states that: The following terms, conditions or requirements must be met by the bidder to be considered responsive to the ITB. These responsiveness requirements are mandatory.Failure to meet these responsiveness requirements will cause rejection of a bid. Any bid rejected for failure to meet responsiveness requirements will not be further reviewed. (Emphasis in original). Nearly identical language is contained in Sections 1.7 and 4.3.6.1 of the ITB, and in the ITB Review Manual used by Department staff in reviewing the bids submitted in response to the ITB. Indeed, the ITB Review Manual refers to the mandatory responsiveness requirements as “fatal criteria.” The mandatory responsiveness requirement in the ITB that is most pertinent to this case is in Section 5.1.2,3 which states: It is mandatory that the bidder supply one original signed Bid and three (3) copies of the signed bid. . . . . (Emphasis in original). The bid package submitted by CES did not include the original signed bid. It only included the three copies of the signed bid. This omission was noted by Christina Espinosa, the procurement manager for the ITB who opened the bids on the afternoon of December 15, 2006. However, after Ms. Espinosa consulted with her supervisor and the Department’s legal staff, it was determined that the omission was not material and that CES should be given an opportunity to “cure” its failure to submit the original signed bid. As a result, Ms. Espinosa contacted CES and gave it 24 business hours to “cure” the deficiency. CES delivered the original signed bid to the Department on the morning of December 18, 2006, which is three days after the bid submittal deadline in the ITB, but within the 24-business hour deadline given by Ms. Espinosa.4 CES did not have a representative at the bid opening, and there is no evidence that CES knew it was the lowest bidder, either when Ms. Espinosa gave CES an opportunity to “cure” its failure to submit an original bid on December 15, 2006, or when it submitted the original bid on December 18, 2006. It is undisputed that the original signed bid submitted by CES on December 18, 2006, is identical in all respects to the three copies of the bid that were timely submitted by CES on December 15, 2006. Ms. Espinosa reviewed the bid submitted by CES despite its failure to include the original signed bid. According to ITB provisions referenced above, that omission should have resulted in the bid being rejected and not further reviewed. The CES bid included at least one other deviation from the specifications in the ITB. The bid stated in the “service delivery synopsis” that the turnaround time for the repair of fixed equipment would be 15 working days. A 15-day time period was referenced in the original ITB, but it was changed to eight days in an addendum. Ms. Espinosa contacted CES about this discrepancy, and on January 3, 2007, CES advised Ms. Espinosa by e-mail that it “acknowledges the change in repair times from 15 days to 8 days.” CES was not the only bidder that Ms. Espinosa contacted after the bids were opened to obtain clarification or information omitted from the bid. For example, she contacted First Communications to obtain copies of its articles of incorporation and business licenses that were not included in its bid; to get clarification regarding First Communications’ use of subcontractors; and to confirm that First Communications acknowledged the eight-day turnaround time for repair of fixed equipment since its bid did not contain a service delivery synopsis. Section 4.3.1 of the ITB authorizes the Department to “seek clarifications or request any information deemed necessary for proper review of submissions from any bidder deemed eligible for Contract award.” However, Section 4.3.1 also states that “no modifications by the bidder of submitted bids will be allowed.” The ITB authorizes the Department to waive minor irregularities and non-material deviations in bids, and on this issue, the ITB states: Rejection of Bids The Department shall reject any and all bids not meeting mandatory responsiveness requirements. In addition, the Department shall also reject any or all bids containing material deviations. The following definitions are to be utilized in making these determinations. Mandatory Responsiveness Requirements: Terms, conditions or requirements that must be met by the bidder to be responsive to this solicitation. These responsiveness requirements are mandatory. Failure to meet these responsiveness requirements will cause rejection of a bid. Any bid rejected for failure to meet mandatory responsiveness requirements will not be further reviewed. Material Deviations: The Department has established certain requirements with respect to bids to be submitted by the bidder. The use of shall, must or will (except to indicate simple futurity) in this ITB indicates a requirement or condition which may not be waived by the Department except where any deviation there from is not material. A deviation is material if, in the Department’s sole discretion, the deficient response is not in substantial accord with this ITB’s requirements, provides an advantage to one bidder over other bidders, or has a potentially significant effect on the quantity or quality of terms or services bid, or the prices submitted to the Department. Material deviations cannot be waived and shall be the basis for rejection of a bid. Minor Irregularities: A variation from the solicitation terms and conditions which does not affect the price proposed or give the bidder an advantage or benefit not enjoyed by the other bidders or does not adversely impact the interests of the Department. A minor irregularity will not result in a rejection of a bid. (All emphasis in original). The Department relies on these sections of the ITB as its authority to waive minor irregularities and non-material deviations in bids with respect to any provision of the ITB, including the mandatory responsiveness requirements. On January 4, 2007, the Department posted notice of its intent to award the contract for Region I to CES. In the same posting, the Department rejected all bids for the other three regions. The rejection of all bids for the other regions is not at issue in this case. First Communications timely filed a notice of protest and, then, a formal written protest challenging the intended award of the contract to CES. The Department provided notice of this proceeding to CES, as required by the Order of Pre-hearing Instructions. CES did not file a petition to intervene or otherwise seek to participate in this proceeding.
Recommendation Based upon the foregoing findings of fact and conclusions of law, it is RECOMMENDED that the Department issue a final order dismissing First Communications’ protest. DONE AND ENTERED this 5th day of April, 2007, in Tallahassee, Leon County, Florida. S T. KENT WETHERELL, II Administrative Law Judge Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-3060 (850) 488-9675 SUNCOM 278-9675 Fax Filing (850) 921-6847 www.doah.state.fl.us Filed with the Clerk of the Division of Administrative Hearings this 5th day of April, 2007.
The Issue Whether the Department of Health and Services acted fraudulently, arbitrarily, capriciously, illegally or dishonestly in issuing an award of bid or HRS Lease No. 590:2069 to Harpaul S. Ohri.
Findings Of Fact Sometime before March, 1989, the Department of Health and Rehabilitative Services (HRS) requested and received approval from the Department of General Services (DGS) for additional office space to provide social services in the western portion of Orlando, Orange County, Florida, including a food stamp distribution office. HRS was authorized to procure, through competitive bidding, a lease for 17,250 net rentable square feet of existing office space, plus or minus 3 percent. The said lease was to provide for a full service period of seven years and two options to renew for three years each at specified rates, with occupancy no later than December 1, 1989 or 175 days after the bid award is finalized. The geographic area designated in the bid package for the office space was limited to the following area of Orange County, Florida: Beginning at the intersection of Colonial Drive and Kirkman Road to the intersection of L.B. McLeod Road, then east on L.B. McLeod Road to the, intersection of Rio Grande Avenue then north on Rio Grande Avenue to the, intersection of Colombia Street,, then east on Colombia Street to Interstate 4, then north on Interstate 4 to the intersection of Colonial Drive, then west on Colonial Drive to the point of Beginning. Public notice that HRS was seeking competitive bids was given and HRS prepared a document entitled Invitation to Bid for Existing Office Space (ITB), which set forth in detail all of HRS requirements. The purpose of the ITB was to inform all potential bidders of the minimum requirements for submitting a responsive bid, and the specific criteria by which the bids would be evaluated. Specific areas of importance to Respondent as reflected in the ITB and addressed by the evidence herein were as follows: 17,250 net rentable square feet (plus or minus 3 percent) of existing office space. General office use for use, as a client service center. Seven year term with two options to renew of three years each. 120 off-street, on-site, full size parking spots designated exclusively for use of Department employees and clients, suitably paved and lined, with a minimum of two for the handicapped. Availability of public transportation within reasonable proximity. Availability to adequate dining facilities within two miles. Photographs of the exterior front of the facility, along with documentation of present facility configuration and parking areas including access and egress to public roadways. Availability of elevator for multi-story use. i). Space requirement criteria: Minimum telephone requirements. Back-up interior emergency lighting. Three separate sets of rest rooms, male and female, one meeting the needs of the handicapped General security requirements. Specific security requirements for food stamp distribution center. Window covering over exterior widows to allow both sunlight and energy control; if bidded space without existing windows, then all rooms comprising the exterior of the building would require windows measuring approximately 24 x 36, all secured and inoperable. Full Service including all utilities and janitorial. The evaluation factors and their relative weights were stated in the ITB as follows: Evaluation Criteria The successful bid will be that one determined to be the lowest and best. All bids will be evaluated on the award factors enumerated below: Associated Fiscal Costs Rental rates for basic term of lease Evaluated using present value methodology by application of the present value discount rate of 8.69 percent. (Weighting: 25) Rental rates for optional renewal of terms of lease. Rates proposed are within projected budgeting restraints of the department. (Weighting: 10) Associated moving costs, i.e., furniture, equipment, telephone systems, etc,. (Weighting: 5) Location Proximity of offered space in central or preferred area of map boundaries. (Weighting: 10) Frequency and availability of satisfactory public transportation within proximity of the offered space. (Weighting: 10) The effect of environmental factors, including the physical characteristics of the building and the area surrounding it, on the efficient and economical conduct of the departmental operations planned for the requested space. (Weighting: 10) Facility Susceptibility of design of the space offered to efficient layout and good utilization. (Weighting 15) Provision of the aggregate square footage in a single building. Proposals will be con- sidered, but fewer points given, which offer the aggregate square footage in not more than two locations provided the facilities are immediately adjacent to or within 100 yards of each other. (Weighting: 10) TOTAL POSSIBLE 100 percent The bid package contained various bid specifications, bid evaluation criteria and the numerical weight assigned to each of those criteria. Sealed bids were submitted by three bidders, Petitioner, Harpaul S. Ohri and Kensington Gardens Builders Corp. The bids were opened on April 25, 1989, and Ernie Wilson, HRS District 7 Facilities Services Manager, determined that all three bids were responsive, and within the mandatory geographical area designated in the bid package. The District Administrator appointed a bid evaluation committee to review and grade, the responsive bids under the criteria established in the bid package, and to recommend to him the committees choice of the lowest and best bid. Four individuals who were familiar with the type of work to be done in the proposed space and familiar with the bid process were appointed to the Committee. On or about May 1, 1990 the bid evaluation committee determined that the bid of Harpaul S. Ohri was the "lowest and best bid" and submitted its determination, in writing, to the District Administrator who, subsequently approved the selection. On or about June 26, 1989, on behalf of the Department, Ernie Wilson, Facilities Services Manager, notified the bidders of the Departments intent to award the bid to Harpaul S. Ohri, as being in the best interest of the Department. The bid evaluation committee consisted of four representatives of the Department who visited two of the three bidders sites and questioned the bidders representatives. The members of the committee were familiar with the Petitioners site from previous experience. They choose not to make an on-site visit prior to completing the bid evaluation sheet, although instructed to do so on the Evaluation Committee Duties and Responsibilities/Real Property, Leasing instruction sheet. Each committee member completed an evaluation sheet and gave a higher total score to Mr. Ohri. The three major bid evaluation criteria were Fiscal Cost, Location and Facility. Under the Fiscal Cost criterion were three sub-categories: Rental Rates, Renewal Rates, and Moving Costs. For Rental Rates, Petitioner received an average of 22.7 points out of 30 possible,, while Ohri received 21.7, and Kensington Gardens received 23.7 points. The points were individually assessed by the evaluation committee, after the rental rates were compared by Ernie Wilson based on the present value analysis of bidders proposed rates. For Renewal Rates, each of the bidders, including Petitioner, received 5 points out of 10 possible. The present value analysis was not applied, as was noted in the ITB. However, even a cursory examination of the renewal rates submitted by the bidders shows that there is a 15 percent to 33 percent yearly differential in the rates, with the Petitioners rates as the lowest and Kensington Gardens as the highest. Although the committee assigned all three bidders an equal rating, the renewal rates submitted by the bidders were not equal should the Department wish to exercise its options, the rates submitted by Petitioner were substantially lower than the other two bidders and would result in a cost savings to the Department of several hundred thousand of dollars. The award factor points should not have been awarded equally. For Moving Costs, Petitioner received 5 points on each of the committee members sheets, while Ohri received 4 points and Kensington Gardens received, an average of 3.7 points. The maximum points possible was 5 points. Petitioner was awarded the maximum points because HRS is presently in the same building and no moving costs would be experienced. The other two bidders were awarded 4 points each by committee members. That determination was based on each members personal experiences. No cost or time lost data was provided or requested. The LOCATION criterion also had three sub-categories: Proximity to other governmental agencies - 10 points - with all three bidders receiving the same rating; Public Transportation -10 points - with all three ,bidders, receiving the same rating; and Environmental Factors - 10 points - out of which Petitioner received an average of 5.7 points; Ohri - 9.7 points and Kensington Gardens - 6.5 points. In considering the proximity to other governmental agencies of each of the facilities being considered, the committee relied on their own knowledge of the area. They determined that since each was within the geographical area designated in the ITB, each was equally distant from the most frequently visited government agencies in the vicinity. However, Petitioners facility is the most centrally located of the three facilities offered, while the two other facilities were considerably distant from other government agencies. The award factor points should not have been awarded equally. For Public Transportation, the committee determined that local bus service went near each of the three facilities. They were neither provided, nor did they request, route maps, schedules or passenger capacity for buses servicing each facility. Petitioners facility is centralized in the area served within the bid district, and serviced by, numerous bus lines which pass near the facility ten times per hour. The bus service to the other two facilities are limited to four buses per hour, with buses having a smaller capacity. In addition, most clients would be required to travel to the central bus terminal and transfer to a different route in order, to reach the Ohri or Kensington Gardens facilities, making bus transportation a very time-consuming process. No other form of transportation is available, except for taxi service. In addition, in order for a client to walk from the nearest bus stop to the Ohri facility, a person would cross two heavily traveled six lane streets and then walk across an open shopping center parking lot. This would require approximately a fifteen minute walk. In order to reach Petitioners facility, a client would require approximately a five minute walk utilizing public sidewalks. The committee did not consider these facts in its evaluation. The award factor points should not have been awarded equally. (c)(1). For Environmental Factors, the committee considered each buildings physical characteristics and the surrounding area. The committee, in their letter to the District Administrator, dated May 1, 1989, identified this category as "a very critical area for the new lease." The letter also stated: "The committee took the following into account when evaluating this section: Cleanliness of the building aid surrounding areas. Lack of traffic congestion by motorized vehicles close to the facility. Easiness of getting to and from the facility by vehicle. Safety for clients and staff walking to and from the facility. Upkeep of the surrounding buildings or other sections of the bidders building." The following was also taken into account when evaluating this section, but was not so stated in the letter. At least one committee member believed the lack of window space in Petitioners facility was disabling to his bid, and that the willingness of the Ohri representative to install windows on exterior walls was a significant factor in her determination of award. At least one committee member indicated that future expansion was a substantial factor in her favoring the Ohri bid, and that there was janitorial and security problems at Petitioners facility. The committee received no other information other than the committee members opinion regarding the same. The committee as a whole erroneously believed that the extra square footage visible at the Ohri facility at the time of their inspection would necessarily be available to HRS if and when it might expand its offices. Future expansion was specifically removed from the ITB at the pre-bid conference and it was clearly erroneous for them to have included this factor in their bid evaluation. The ITB specifically calls for the installation of exterior windows by the winning bid prior to occupancy. However, none of the committee members reviewed the ITB or the actual bids submitted. They relied primarily on the synopsis of the bids prepared by Ernie Wilson. The ITB states substantial general and specific security requirements in detail; however, the evaluation criteria forms do not provide a category for evaluating security other than generally under the sub-category of environmental factors. The ITB, under General Specifications and Requirements, called for the availability of adequate dining facilities within two miles of the proposed facility. The evaluation criteria did not provide a category for the committee to rate dining facility availability. In consideration of the environmental factors, the committee overlooked or failed to consider a hazardous unfenced high voltage transmission station adjacent to the Ohri facility. In addition, the photographs submitted by Ohri as the front of the building (as required by the ITB) are in fact the rear of the building which was not offered as part of the proposed leased facility. Of the three sub-categories under FACILITY, out of 15 possible points, Petitioner received an average rating of 9.5, Ohri received an average of 13.7 and Kensington Gardens received 11.2 for Layout/Utilization. Ohri received the most points because his building configuration was a, shell and was more flexible and could be reconfigured for more efficient layout to suit the Departments needs. All three bidders submitted proposals wherein the total square footage of rentable space was to be contained in a Single Building. Therefore, all three bidders received the maximum 10 points. A maximum 5 points was provided for facilities with Street-level space. All three bidders were awarded the maximum 5 points. However, a portion of Petitioners space was offered on the second floor, a fact which the committee overlooked. The Petitioner should not have received the full 5 points for having street-level space. The unanimous recommendation of the evaluation was to award the lease to Ohri. In reaching that conclusion, the committee did not properly utilize the weighted bid criteria and, in addition, included improper bid considerations in their evaluation of the three facilities. Some of the reasons given by the committee for distinguishing and preferring one bid over another were rational and reasonable considerations and were covered by the bid evaluation criteria. However, others were erroneous and improper.
Recommendation Based on the foregoing findings of fact and conclusions of law, the Hearing Officer recommends that the Secretary of the Department of Health and Rehabilitative Services enter a Final Order rejecting all bids for lease number 590:2069 and issue a new invitation to bid. DONE AND ENTERED this 12th day of February, 1990, in Tallahassee, Leon County, Florida. DANIEL M. KILBRIDE Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 12th day of February, 1990. APPENDIX The following constitutes my specific rulings, in accordance with section 120.59, Florida Statutes, on findings of fact submitted by the parties. Proposed Findings of Fact submitted by the Petitioner: Accepted: paragraphs 1, 2, 3, 5, 6, 7, 9 (in substance, except for subparagraphs f, g, j and k which are not relevant), 10 (in substance), 12(a), (b), (f-in substance), (g-in substance), (h-in substance), (j), (k-in substance), (l-in substance), (p-in substance). Rejected: Not relevant: paragraphs 4, 12(c), (d), (e), (m), (n), (o), (p- the proposed future location of the Greyhound Station; insure wooded area nearby), (q), (r). Argument: paragraphs 11 and 13. Procedural matters, covered in the preliminary statement: paragraphs 8 and 14. Respondent did not submit proposed findings of fact. COPIES FURNISHED: Terrence W. Ackert, Esquire 201 East Pine Street Suite 1402 Orlando, Florida James Sawyer, Jr., Esquire District 7 Legal Counsel Department of Health and Rehabilitative Services 400 West Robinson Street Orlando, Florida Sam Power Clerk Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, FL 32399-0700 John Miller General Counsel Department of Health and Rehabilitative Services 1323 Winewood Boulevard Tallahassee, FL 32399-0700
The Issue The issue is whether Kelly Services is the lowest responsive bidder on Bid No. 89-23 and should be awarded the bid.
Findings Of Fact On June 2, 1988, the School Board of Bay County issued Bid Request No. 89-23 for garbage collection services at thirteen locations. A quotation sheet was included in the bid package. The quotation sheet indicated the thirteen locations with a blank next to each location and a dollar sign in front of each blank where each bidder was to indicate its average monthly total charge for each location. There was also a quotation schedule where the bidder was to indicate the calculations which went into the total bid for each location. The bid request provided: The Board reserves the right to waive formalities and to reject any and all bids or to accept any bid or combination of bids deemed in the Board's best interest and the decision of the Board will be final. Bidders desiring that their bid be considered on an all-or-none basis, either in whole or part, shall so indicate. It is the intent of this bid request to secure prices and establish contracts for garbage collection services for the twelve schools specified herein and the District Maintenance Department. Awards will be made by location and will be based on an average monthly total charge as calculated on the quotation sheet. The bids were opened at 10:00 am., June 13, 1988, at the offices of the Bay County School Board. Three completed bid packages were submitted. Kelly Services, Argus and M&O each submitted a completed bid quotation sheet containing the bid for each location. M&O also submitted a letter which stated: We would like to submit this bid on an all- or-nothing basis as specified in paragraph four of the cover letter to the bid. For an estimated cost of $3,391.84. The quotation sheet and quotation schedule submitted by M&O did not reflect the all-or-nothing bid amount. Instead, the quotation sheet and quotation schedule showed a total bid of $3,738.24 when calculated by location. Based on the bids submitted by each bidder as shown on the quotation sheet add quotation schedules, Kelly Services was low bidder on five locations (Callaway, Tyndall, Waller, Southport, and Cedar Grove) ; Argus was low bidder on six locations (Parker, Hiland, Haney, Mosley, Beach and Merritt Brown); and M&O was low bidder on two locations (West Bay and the District Maintenance Department). Prior to the deadline for submitting bids, John Harrison, Purchasing Agent for the Board, responded to an inquiry from M&O by advising M&O that it could submit two bids, one as specified in the Bid Request by location and one as an all-or- nothing bid. No other bidders were advised that they could submit two bids. At the bid opening, M&O did not submit a quotation sheet or schedule for its all-or-nothing bid. A bid which did not have a breakdown per dump per container per facility would not be acceptable to the Board and does not meet the specifications in the Bid Request. The breakdown per dump per container per location is necessary to verify proper invoicing for specific locations on months when there is a change in the number of dumps or containers at that location. After opening the bids, the Board compiled the low bid for each location and then totaled that list. That total of $3,606.09 was greater than the all-or-nothing bid by M&O. Because M&O's all-or-nothing bid failed to meet the specifications by not having a location breakdown the Board contacted M&O to determine if its "estimated" bid was firm and to request a breakdown on the quotation schedule form for the all- or-nothing bid. On June 15, 1988, two days after the bid opening, M&O submitted a letter to the Board clarifying that its all-or- nothing bid was a firm bid for each location and M&O submitted a quotation schedule for each location per dump per container (see page 7 of Joint Exhibit 1 and the last page of Joint Exhibit 2). The charge for each location in this quotation schedule is different than the quotation schedule submitted by M&O at the bid opening and is for the most part lower per location than either M&O's first quotation schedule or the low bids taken from the quotation schedules submitted at the bid opening. Based on the letter and all-or-nothing quotation schedule filed by M&O on June 15, 1988, the Board determined to award the bid for garbage collection services to M&O for the all- or-nothing bid of $3,391.84.
Recommendation Based upon the foregoing Findings of Fact and Conclusions of Law it is RECOMMENDED that The School Board of Bay County enter a Final Order rejecting all bids and readvertising the bid request for garbage collection services as specified in Bid Request No. 89-23. DONE and ENTERED this 13th day of September, 1988, in Tallahassee, Florida. DIANE K. KIESLING Hearing Officer Division of Administrative Hearings The Oakland Building 2009 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 13th day of September, 1988. APPENDIX TO THE RECOMMENDED ORDER IN CASE NO. 88-3768BID The following constitutes my specific rulings pursuant to Section 120.59(2), Florida Statutes, on the proposed findings of fact submitted by the parties in this case. Specific Rulings on Proposed Findings of Fact Submitted by Petitioner, Kelly Services: 1. Each of the following proposed findings of fact are adopted in substance as modified in the Recommended Order. The number in parentheses is the Finding of Fact which so adopts the proposed finding of fact: 1-3(1-3); 4-6(3); 7-11(7-11); and 12 (9) Specific Rulings on Proposed Findings of Fact Submitted by Respondent, School Board of Bay County: Each of the following proposed findings of fact are adopted in substance as modified in the Recommended Order. The number in parentheses is the Finding of Fact which so adopts the proposed finding of fact: 1(2); 3(10&11); and 5(8). Proposed findings of fact 6, 7, and 9 are irrelevant. The first sentence of proposed finding of fact 2 is unsupported by the competent, substantial evidence. The remainder of proposed finding of fact 2 is adopted in substance as modified in Finding of Fact 3. Proposed finding of fact 4 is rejected as being unsupported by the competent, substantial evidence. The last sentence of proposed finding of fact 5 is rejected as being argumentative, conclusory and unsupported by the competent, substantial evidence. Proposed finding of fact 8 is unnecessary. Specific Rulings on Proposed Findings of Fact Submitted by Intervenor, Argus Services, Inc.: Each of the following proposed findings of fact are adopted in substance as modified in the Recommended Order. The number in parentheses is the Finding of Fact which so adopts the proposed finding of fact: 2-4(1-3); 6-8(5); 9 & 10(6) 11(3); and 12(11). Proposed findings of fact 1 and 5 are unnecessary. Proposed findings of fact 13-17 are rejected as constituting argument and not findings of fact. COPIES FURNISHED: Jeffrey P. Whitton Attorney at Law Post Office Box 1956 Panama City, Florida 32402 Franklin R. Harrison Attorney at Law 304 Magnolia Avenue Panama City, Florida 32401 Scott W. Clemons Attorney at Law Post Office Box 860 Panama City, Florida 32402 School Board of Bay County Post Office Drawer 820 Panama City, Florida 32402-0820 M&O Sanitation, Inc. 266 N. Star Avenue Panama City, Florida 32404
Findings Of Fact During the month of March 1996, the Pinellas County School Board, pursuant to an advertised invitation for bids, (IFB), solicited bids for the construction of a new facility for John H. Sexton Elementary School (Sexton school). Each party submitting a bid was required to do so on a bid proposal form which was contained in the bid documents prepared by the project architect, Mr. Hoffman, and furnished to each prospective bidder who requested the bid package. One section of the bid proposal form related to "dewatering" potentially required at the construction site, and consistent with that potential two sentences were contained on the bid proposal form relating to dewatering of footings and of utilities, both of which provided for election by checking of an affirmative or a negative, and both of which had been pre-checked in the affirmative by the Board. It was the position of the Board that the pre- checked sentences as to dewatering on the bid proposal form constituted an acknowledgment by each bidder that that bidder's submittal included dewatering in the base bid. In addition to the check, the dewatering section also included blanks for the insertion by the bidder of figures representing lineal feet of header pipe and unit price per foot which figure would constitute a credit given by the bidder to the Board against the total bid price if dewatering were found not to be necessary, both as to footings and to utilities. Even further, the form also contained blanks to be filled in by the bidder for unit prices to be charged the Board in the event additional dewatering was required by virtue of the Board's later inclusion in the project of additional footings or utilities. Prior to the time for bid submittal, the Board conducted a meeting of all prospective bidders at which the project was explained and bidders given an opportunity to ask questions raised by the bid package. Johnson did not ask any questions regarding dewatering or that portion of the package relating thereto. Numerous bids were submitted in response to the proposal, including those from Johnson and Ellis. By stipulation at the hearing, the parties agreed that in all ways other than in that section of the bid proposal form for this project relating to dewatering, Johnson was and is a responsive and responsible bidder, as is Ellis. The bid proposals were opened by the Board at 2:00 PM on April 11, 1996 and the base bid prices on each proposal were read aloud to all in attendance by a Board representative. The project architect was present at the opening and tabulated and reviewed the bid proposals as opened. Johnson submitted the lowest base bid with a price of $7,965,000. The next lowest bid was that of Ellis, whose base bid price was $7,945,200. At the time of opening, no Board representative indicated anything was wrong with Johnson's bid Mr. Hoffman, the project architect, immediately noticed that Johnson had altered the Board's pre-checked bid proposal form by striking out the pre- checked "is" space regarding inclusion of dewatering in the base price of the two dewaterings, and making an X in each of the "is not" spaces. Mr. Hoffman considered that alteration by Johnson as a material alteration of the Board's solicitation which rendered Johnson's bid non-responsive. It must be noted that each change bears the initials, R. Y. Reza Yazdani is Johnson's president who initialed the changes and signed the bid proposal form for the company. In addition, Johnson also inserted a "0" in those spaces which dealt with amount of credit and cost of additional dewatering in the event additional work is required by the Board. In that regard, Hoffman opined that had Johnson not changed the check marks, but inserted the "0" figures as it did, the bid would have been responsive and Johnson would still have been lowest responsive bidder. The reason for this is that the bid form specifically notes that "the unit costs described in A & B above shall in no manner influence the School Board's selection of a firm to whom to award the Contract." The Board now recognizes that there is no part "B", as referenced in the proposal form. Since the "0's" would not influence the selection, use of an unmodified Board form, along with the lowest submitted base price would, in Hoffman's opinion, probably have meant that Johnson would have been awarded the contract. Johnson's representative, Mr. Mohme, who drafted the company proposal, specifically indicated he did not believe dewatering was a potential in this project. He recognized that such dewatering as was necessary was required by other provisions in the project specifications and he could not figure any way to recognize this and yet accurately reflect his belief that dewatering would not be necessary, other than to strike the pre-checked block and insert the check in the alternative block. He felt that by doing so, he was more accurately reflecting Johnson's bid. This reasoning is rather obscure. By letter dated April 12, 1996, written to the Board after the bids were opened, Mr. Mohme reiterated Johnson's position that dewatering is not necessary on this project, but further stated that if dewatering were to be necessary, Johnson would do so solely at its own risk and without any risk of additional cost to the Board. Bids may be clarified by a bidder, but such clarification must take place before the bids are opened. Bids may not be modified after bid opening. Before that letter was written, however, when the bids were opened and Mr. Hoffman observed what he considered was Johnson's alteration of the bid form, Hoffman consulted with a representative of the Board's purchasing department, Ms. Maas, who also reviewed Johnson's bid. Ms. Mass was of the opinion that Johnson may have attempted to qualify its bid, and she and Mr. Hoffman thereafter met with Mr. Rivas, the Board's director of facilities design and construction, to explain the problem. Mr. Rivas took the problem to two other Board personnel to see if there were some way Johnson's bid could be deemed responsive so that the Board could benefit by Johnson's low bid price. Within the context of those aforementioned discussions, Hoffman took the position that the alteration might leave the Board open to a possible change order and additional liability if dewatering were to be required and the Board had accepted Johnson's bid indicating that process was not included in the base price. Mr. Rivas, after consulting with the Board's attorney, also concluded that Johnson's alteration expressly excluded dewatering as an included factor and its exclusion constituted a serious and material deviation from the Board's solicitation. It was deemed material in that the deviation apparently gave Johnson a competitive advantage over other bidders who did not amend the form. This appears to be a valid conclusion and is adopted herein. The decision to recommend rejection of Johnson's bid and acceptance of Ellis's as the lowest responsive bid was ultimately reached by the Board's administrative staff. The Ellis bid was responsive to the solicitation whereas the determination was made that Johnson's was not responsive because of the alteration. It was not the actual act of alteration that caused that determination but rather the potential effect of the alteration. This was consistent with long standing Board policy not to accept a bid which does not conform to a bid solicitation and not to accept bids from bidders who alter the Board's bid proposal form or otherwise attempt to qualify their bids. It is the opinion of the Board personnel that such consistency in bidding procedure has resulted over time in more qualified bidders submitting bids for Board work which, in turn, has resulted in more competitive prices for the work let for bid. This is a reasonable policy. Mr. Gottschalk, Johnson's expert architect, who has designed schools for the Board, offered an alternative disposition to this dilemma. While admitting that Johnson's shifting of the risk of loss as a result of possible dewatering was a material matter, he suggested the Board could have disregarded the dewatering clause on every submittal and thereafter awarded the contract to Johnson, the lowest bidder, whose bid was responsive to the solicitation except for the dewatering provision. Recognizing this solution would have placed each bidder on an equal footing and allowed award to the lowest bidder at a substantial savings to the Board, he nonetheless also understood the decision made by Mr. Hoffman and the Board staff here and could not fault it. He agreed that reasonable men could differ on the issue of responsiveness here and how to deal with it. It is so found. After a review of the evidence submitted, including the testimony indicating the remoteness of the likelihood that extensive dewatering would be required, there appears to be no evidence that the Board, or its staff, acted dishonestly, fraudulently, illegally or arbitrarily in rejecting Johnson's bid on this project and recommending award to Ellis.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is recommended that the Pinellas County School Board enter a final order denying and dismissing G. H. Johnson Construction Company's protest and awarding a contract for the construction of Sexton Elementary School to Ellis Construction Company, Inc. DONE and ENTERED this 8th day of May, 1996, in Tallahassee, Florida. ARNOLD H. POLLOCK, Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 8th day of May, 1996. APPENDIX TO RECOMMENDED ORDER, CASE NO. 96-1942BID To comply with the requirements of Section 120.59(2), Florida Statutes (1993), the following rulings are made on the parties' proposed findings of fact: Johnson's Proposed Findings of Fact. 1.-5. Accepted and incorporated herein. Accepted. Accepted but not a proper Finding of Fact. More a restatement of and comment on testimony. Rejected. Accepted but not a proper Findings of Fact. More a restatement of and comment on testimony. &11. Accepted. Accepted and incorporated herein. First sentence accepted as a literal statement of what appears in the specifications. Second and third sentences accepted but not probative of any material issue of fact. Accepted and incorporated herein. First sentence accepted. Balance not Finding of fact but argument. Ellis' Proposed Findings of Fact. 1.&2. Accepted and incorporated herein. 3.-6. Accepted. 7.-10. Accepted and incorporated herein. 11.-15. Accepted and incorporated herein. 16. Accepted but word "certain" is changed to read "likely." 17.-21. Accepted and incorporated herein. 22. Accepted and incorporated herein. 23.&24. Accepted. 25.&26. Accepted and incorporated herein. 27.-29. Accepted. Accepted and incorporated herein. Not relevant to any material issue of fact. COPIES FURNISHED: Jawdet I. Rubaii, Esquire Clearwater Executive Suites, No. 213 1345 South Missouri Avenue Clearwater, Florida 34616 John W. Bowen, Esquire Pinellas County School Board 301 4th Street S.W. Largo, Florida 34649-2942 E. A. Mills, Jr. Esquire Dale W. Vash, Esquire Fowler, White, Gillen, Boggs, Villareal and Banker, P.A. 501 East Kennedy Boulevard Post Office Box 1438 Tampa, Florida 33601 Pinellas County School Board 301 4th Avenue, S.W. Largo, Florida 34649-2942
Findings Of Fact On August 31, 1994, the Respondent received and opened bids for its Project No. HSMV 92044000, Repairs, Art Sutton Drivers' License Office, Miami, Florida (the Project). The bid specification documents (the Specifications) for the Project included requirements for a Base Bid and for specific alternate proposals with respect to three defined items of alternate work. Section 01100 of the Specifications stated that "[a]ll Alternates described in this Section are required to be reflected on the Bid Form as submitted by the bidder." Part 2 of that section provided: ALTERNATE NO. 1 A. Provide a deductive price to the base bid for the removal of existing window units and the installation of new units as indicated in plans and specification Section 08520. ALTERNATE NO. 2 A. Provide a deductive price to the base bid for the provision of communications conductors see specification Section 16400. ALTERNATE No. 3 A. Provide a deductive price to the base bid for the installation of all landscape materials as indicated on plans and as per specification Section 02960. Also included in the Specifications as Exhibit 4 was a Proposal Form. The Specifications required each bidder to submit this form in triplicate on the bidder's letterhead. With respect to alternates, the Proposal Form required: With the foregoing as a Base Bid, the following costs of alternate proposals are submitted in accordance with the drawings and specifications. Alternate No. 1 Add or Deduct $ Alternate No. 2 Add or Deduct $ Alternate No. 3 Add or Deduct $ The Respondent's architect received four bids on August 31, 1994. As recorded on the Bid Tabulation and Notice of Award Recommendation, three bidders provided specific prices for the three alternates, as well as a Base Bid. The Bid Tabulation shows that two bidders provided specific prices for the three alternates and included the alternate prices in their Base Bids. The Petitioner provided specific prices for the three alternates, but excluded the alternate prices from its Base Bid. The fourth bidder provided a specific price for only one alternate and excluded that alternate price from its Base Bid. (The fourth bidder was disqualified as non-responsive for failing to submit prices on all three alternates.) In pertinent part, the Petitioner's proposal read: With the foregoing as a Base Bid, the following costs of alternate proposals are submitted in accordance with the drawings and specifications: Alternate No. 1 Add or Deduct . . . $4,400.00 Alternate No. 2 Add or Deduct . . . $1,158.00 Alternate No. 3 Add or Deduct . . . $2,084.00 These Alternates were in addition to the Petitioner's Base bid of $204,322.00. The proposal form submitted by the Petitioner comports with Exhibit 4 to the Specifications, which was the mandatory Proposal Form. On August 31, 1994, William Phillip Austin, Peitioner's President, wrote the architect: Per our telephone conversation this date regard- ing the confusion relating to the Add/Deduct for Alternates 1, 2 and 3 for the above project, please be advised that our base bid did not include the work described in the Alternates. As stated if you want work described in Alternates 1, 2 and 3, you must add the cost to our base bid. The base bid including Alternates 1, 2 and 3 would, therefore, be $211,964.00. If we can provide additional information, please do not hesitate to contact us. The Respondent's architect completed and submitted the bid Tabulation and Notice of Award Recommendation to the Respondent in early September. The document clearly discloses the amounts of each bidder's Base Bid and Alternate proposals. Using plus (+) and minus (-) signs, the Bid Tabulation further shows each bidder's method of calculation. The record is devoid of evidence that the Respondent had any problem in evaluating the bids and identifying the lowest bidder. The Petitioner was the lowest bidder on any combination of base bid plus or minus any or all alternates. Subsequently the Petitioner received a NOTICE OF AWARD RECOMMENDATION dated October 4, 1994. The Notice informed the Petitioner that the Respondent "has recommended that the contract be awarded to your firm in the total amount of $211,964.00, accepting the Base Bid and Alternates #1, #2 & #3. The Administrator of Contracts Design and Permitting, Division of Building Construction, Department of Management Services, State of Florida will consider this recommendation." Larry R. Coleman, Construction Projects Administrator, signed the letter. The Petitioner acknowledged receipt. A representative of the second lowest bidder, Kalex Construction, then contacted the Respondent, complaining of the Award Recommendation. The grounds for the Kalex complaint are not in the record. However, on October 14, 1994, H. R. Hough, the Respondent's Contracts Administrator, sent the Petitioner a letter "to notify you of the State's decision to reject all bids on the above referenced project due to ambiguities in the specifications." Mr. Hough's reasons for the rejection are "other than those stated by the protestor," Kalex. The Respondent's Rule 60D-5.007, Florida Administrative Code, states: Determination of Successful Bidder. All projects except where competitive bidding is waived under the provisions of Rule 60D-5.008 will be publicly bid in accordance with the provisions in the project specifications bidding documents. Award of contract will be made to the responsive bidder, determined to be qualified in accordance with the provisions herein and meeting the requirements of the bidding documents, that submits the lowest valid bid for the work. The lowest bid will be determined as follows: The lowest bid will be the bid from the responsive bidder that has submitted the lowest price for the base bid or the base bid plus the additive alternates or less the deductive alternates chosen by the Agency to be included in or excluded from the proposed contract, taken in numerical order listed in the bid documents. The order of the alternates may be selected by the Agency in any sequence so long as such acceptance out of order does not alter the designation of the low bidder. Under the above-quoted rule, the Respondent compares bids beginning with the lowest "base bid." The Respondent is of the view that for this comparison to be fair and equal, all bidders must include the same scope of work in the "base bid." The Respondent does not interpret the above-quoted rule to allow deductive alternates from some bidders and additive alternates from others. (For reasons discussed in the Conclusions of Law which follow, the Respondent's interpretation and application of the above-quoted rule is erroneous.) The Specifications contain some ambiguous and inconsistent language regarding whether alternates should be treated as additive or deductive. The ambiguous and inconsistent language did not provide any bidder with an advantage or a disadvantage, nor did it otherwise affect the fairness of the bidding process.
Recommendation Based on the foregoing Findings of Fact and Conclusions of Law, it is RECOMMENDED that the Department of Management Services issue a Final Order in this case awarding a contract for the subject project to the Petitioner. DONE AND ENTERED in Tallahassee, Leon County, Florida, this 16th day of December 1994. MICHAEL M. PARRISH Hearing Officer Division of Administrative Hearings The DeSoto Building 1230 Apalachee Parkway Tallahassee, Florida 32399-1550 (904) 488-9675 Filed with the Clerk of the Division of Administrative Hearings this 16th day of December 1994. APPENDIX The following are my specific rulings on all proposed findings of fact submitted by all parties. Proposed findings submitted by Petitioner Paragraph 1: This is primarily a statement of position and is addressed in the Preliminary Statement. Paragraphs 2 through 10: Accepted in substance with a few unnecessary details omitted. Proposed findings submitted by Respondent Paragraphs 1 through 6: Accepted in substance. Paragraph 7: First sentence accepted in substance. Second sentence rejected as constituting a conclusion which is not warranted by the evidence. Third sentence is accepted as an accurate statement of how Respondent has been interpreting the subject rule, but is not accepted as constituting a correct interpretation of the rule. Paragraph 8: Rejected as misleading and confusing because the "scope of work" to be performed under the contract can only be determined after the Respondent decides which alternates to include and which to exclude. Paragraph 9: The first two sentences are accepted in substance. The last sentence is rejected as constituting a conclusion which is not warranted by the evidence. COPIES FURNISHED: Timothy J. Armstrong, Esquire Armstrong & Mejer Suite 1111 Douglas Centre 2600 Douglas Road Coral Gables, Florida 33134 Stephen S. Mathues, Esquire Department of General Services Knight Building, Suite 312 Koger Executive Center 2737 Centerview Drive Tallahassee, Florida 32399-0950 Paul A. Rowell, General Counsel Department of General Services Knight Building, Suite 312 Koger Executive Center 2737 Centerview Drive Tallahassee, Florida 32399-0950 William H. Lindner, Secretary Department of General Services Knight Building, Suite 307 Koger Executive Center 2737 Centerview Drive Tallahassee, Florida 32399-0950